Magellan Utilities Development Corp., et al.; Electric Rate and
Corporate Regulation Filings
December 3, 1997.
Take notice that the following filings have been made with the
Commission:
1. Magellan Utilities Development Corporation
[Docket No. EG98-11-000]
Take notice that on November 26, 1997, Magellan Utilities
Development Corporation (Magellan) of 4/F Ortigas Building, Ortigas
Avenue, Pasig City, Philippines, filed with the Federal Energy
Regulatory Commission an application for determination of exempt
wholesale generator status pursuant to Part 365 of the Commission's
Regulations.
Applicant asserts that it is a corporation organized under
Philippine law which was formed to develop and own a 300 megawatt
pulverized coal-fired power plant to be located south of Manila, the
Philippines (the Facility), which will be an eligible facility as
defined in the Public Utility Holding Company Act of 1935. All of the
electric energy produced by the Facility will be sold at wholesale to
Manila Electric Company, a Philippine utility, or to other utilities
located in the Philippines.
Comment date: December 22, 1997, in accordance with Standard
Paragraph E at the end of this notice. The Commission will limit its
consideration of comments to those that concern the adequacy or
accuracy of the application.
2. PECO Energy Company
[Docket No. ER98-641-000]
Take notice that on November 13, 1997, PECO Energy Company (PECO),
filed an executed Installed Capacity Obligation Allocation Agreement
between PECO and Strategic Energy Partners Ltd., (hereinafter
Supplier). The terms and conditions contained within this Agreement are
identical to the terms and conditions contained with the Form of
Installed Capacity Allocation Agreement filed by PECO with the
Commission on October 3, 1997, at Docket No. ER98-28-000. This filing
merely submits an individual executed copy of the Installed Capacity
Obligation Allocation Agreement between PECO and an alternate supplier
participating in PECO's Pilot.
Copies of the filing were served on the Supplier and the
Pennsylvania Public Utility Commission.
Comment date: December 17, 1997, in accordance with Standard
Paragraph E at the end of this notice.
3. PECO Energy Company
[Docket No. ER98-642-000]
Take notice that on November 13, 1997, PECO Energy Company (PECO),
filed an executed Transmission Agency Agreement between PECO and
Strategic Energy Partners Ltd. (hereinafter Supplier). The terms and
conditions contained within this Agreement are identical to the terms
and conditions contained with the Form of Transmission Agency Agreement
submitted to the Commission on October 3, 1997, as part of the joint
filing by the Pennsylvania Public Utility Commission and the
Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing
merely submits an individual executed copy of the Transmission Agency
Agreement between PECO and an alternative supplier participating in
PECO's Retail Access Pilot Program.
Copies of the filing were served on the Supplier and the
Pennsylvania Public Utility Commission.
Comment date: December 17, 1997, in accordance with Standard
Paragraph E at the end of this notice.
4. PECO Energy Company
[Docket No. ER98-643-000]
Take notice that on November 13, 1997, PECO Energy Company (PECO),
filed an executed Installed Capacity Obligation Allocation Agreement
between PECO and MidCon Gas Services Corp., (hereinafter Supplier). The
terms and conditions contained within this Agreement are identical to
the terms and conditions contained with the Form of Installed Capacity
Allocation Agreement filed by PECO with the Commission on October 3,
1997, at Docket No. ER98-28-000. This filing merely submits an
individual executed copy of the Installed Capacity Obligation
Allocation Agreement between PECO and an alternate supplier
participating in PECO's Pilot.
Copies of the filing were served on the Supplier and the
Pennsylvania Public Utility Commission.
Comment date: December 17, 1997, in accordance with Standard
Paragraph E at the end of this notice.
5. PECO Energy Company
[Docket No. ER98-644-000]
Take notice that on November 13, 1997, PECO Energy Company (PECO),
filed an executed Installed Capacity
[[Page 65076]]
Obligation Allocation Agreement between PECO and CNG Retail Services
Corp., (hereinafter Supplier). The terms and conditions contained
within this Agreement are identical to the terms and conditions
contained with the Form of Installed Capacity Allocation Agreement
filed by PECO with the Commission on October 3, 1997 at Docket No.
ER98-28-000. This filing merely submits an individual executed copy of
the Installed Capacity Obligation Allocation Agreement between PECO and
an alternate supplier participating in PECO's Pilot.
Copies of the filing were served on the Supplier and the
Pennsylvania Public Utility Commission.
Comment date: December 17, 1997, in accordance with Standard
Paragraph E at the end of this notice.
6. PECO Energy Company
[Docket No. ER98-645-000]
Take notice that on November 13, 1997, PECO Energy Company (PECO),
filed an executed Transmission Agency Agreement between PECO and MidCon
Gas Services Corp., (hereinafter Supplier). The terms and conditions
contained within this Agreement are identical to the terms and
conditions contained with the Form of Transmission Agency Agreement
submitted to the Commission on October 3, 1997 as part of the joint
filing by the Pennsylvania Public Utility Commission and the
Pennsylvania PJM Utilities at Docket No. ER98-64-000. This filing
merely submits an individual executed copy of the Transmission Agency
Agreement between PECO and an alternative supplier participating in
PECO's Retail Access Pilot Program.
Copies of the filing were served on the Supplier and the
Pennsylvania Public Utility Commission.
Comment date: December 17, 1997, in accordance with Standard
Paragraph E at the end of this notice.
7. Wisconsin Public Service Corporation
[Docket No. ER98-646-000]
Take notice that on November 13, 1997, Wisconsin Public Service
Corporation, tendered for filing an executed service agreement with
Williams Energy Services Co., under its CS-1 Coordination Sales Tariff.
Comment date: December 17, 1997, in accordance with Standard
Paragraph E at the end of this notice.
8. PP&L, Inc.
[Docket No. ER98-647-000]
Take Notice that on November 13, 1997, PP&L, Inc. (formerly known
as Pennsylvania Power & Light Company) (PP&L), filed a Service
Agreement dated October 27, 1997, with Dayton Power and Light Company
(DP&L) under PP&L's FERC Electric Tariff, Original Volume No. 5. The
Service Agreement adds DP&L as an eligible customer under the Tariff.
PP&L requests an effective date of November 13, 1997, for the
Service Agreement.
PP&L states that copies of this filing have been supplied to DP&L
and to the Pennsylvania Public Utility Commission.
Comment date: December 17, 1997, in accordance with Standard
Paragraph E at the end of this notice.
9. Central Illinois Light Company
[Docket No. ER98-648-000]
Take notice that on November 13, 1997, Central Illinois Light
Company (CILCO), 300 Liberty Street, Peoria, Illinois 61202, tendered
for filing with the Commission a substitute Index of Customers under
its Coordination Sales Tariff and two service agreements for two new
customers, PacificCorp Power Marketing, Inc., and American Electric
Power System.
CILCO requested an effective date of November 7, 1997.
Copies of the filing were served on the affected customers and the
Illinois Commerce Commission.
Comment date: December 17, 1997, in accordance with Standard
Paragraph E at the end of this notice.
10. Additional Signatories to PJM Interconnection, L.L.C. Operating
Agreement
[Docket No. ER98-649-000]
Take notice that on November 13, 1997, the PJM Interconnection,
L.L.C., (PJM), filed on behalf of the Members of the LLC, membership
applications of Bruin Energy, Inc., and PG&E Energy Services
Corporation. PJM requests an effective date on the day after received
by FERC.
Comment date: December 17, 1997, in accordance with Standard
Paragraph E at the end of this notice.
11. Arizona Public Service Company
[Docket No. ER98-650-000]
Take notice that on November 13, 1997, Arizona Public Service
Company (APS), tendered for filing Umbrella Service Agreements to
provide Firm and Non-Firm Point-to-Point Transmission Service under
APS' Open Access Transmission Tariff with NP Energy Inc.
A copy of this filing has been served on NP Energy Inc., and the
Arizona Corporation Commission.
Comment date: December 17, 1997, in accordance with Standard
Paragraph E at the end of this notice.
12. Carolina Power & Light Company
[Docket No. ER98-651-000]
Take notice that on November 13, 1997, Carolina Power & Light
Company (CP&L), tendered for filing a rate schedule enabling CP&L to
make wholesale sales of capacity and energy at market-based rates. CP&L
requests an effective date sixty days from the date of filing.
Comment date: December 17, 1997, in accordance with Standard
Paragraph E at the end of this notice.
13. Puget Sound Energy, Inc.
[Docket No. ER98-652-000]
Take notice that on November 13, 1997, Puget Sound Energy, Inc., as
Transmission Provider, tendered for filing a Service Agreement for Firm
Point-to-Point Transmission Service (Firm Point-to-Point Service
Agreement) and a Service Agreement for Non-Firm Point-to-Point
Transmission Service (Non-Firm Point-to-Point Service Agreement) with
Aquila Power Corporation (Aquila), as Transmission Customer. A copy of
the filing was served upon Aquila.
Comment date: December 17, 1997, in accordance with Standard
Paragraph E at the end of this notice.
14. Puget Sound Energy, Inc.
[Docket No. ER98-653-000]
Take notice that on November 13, 1997, Puget Sound Energy, Inc., as
Transmission Provider, tendered for filing a Service Agreement for Firm
Point-to-Point Transmission Service (Firm Point-to-Point Service
Agreement) and a Service Agreement for Non-Firm Point-to-Point
Transmission Service (Non-Firm Point-to-Point Service Agreement) with
Cook Inlet Energy Supply, LP (CIES), as Transmission Customer. A copy
of the filing was served upon CIES.
Comment date: December 17, 1997, in accordance with Standard
Paragraph E at the end of this notice.
15. Puget Sound Energy, Inc.
[Docket No. ER98-654-000]
Take notice that on November 13, 1997, Puget Sound Energy, Inc., as
Transmission Provider, tendered for filing a Service Agreement for Firm
Point-to-Point Transmission Service (Firm Point-to-Point Service
Agreement) and a Service Agreement for Non-Firm Point-to-Point
Transmission Service (Non-Firm Point-to-Point Service Agreement) with
Cinergy Services, Inc. (Cinergy), as Transmission Customer. A copy of
the filing was served upon Cinergy.
[[Page 65077]]
Comment date: December 17, 1997, in accordance with Standard
Paragraph E at the end of this notice.
16. Puget Sound Energy, Inc.
[Docket No. ER98-655-000]
Take notice that on November 13, 1997, Puget Sound Energy, Inc., as
Transmission Provider, tendered for filing a Service Agreement for Firm
Point-to-Point Transmission Service (Firm Point-to-Point Service
Agreement) and a Service Agreement for Non-Firm Point-to-Point
Transmission Service (Non-Firm Point-to-Point Service Agreement) with
Delhi Energy Services, Inc. (Delhi), as Transmission Customer. A copy
of the filing was served upon Delhi.
Comment date: December 17, 1997, in accordance with Standard
Paragraph E at the end of this notice.
17. Puget Sound Energy, Inc.
[Docket No. ER98-656-000]
Take notice that on November 13, 1997, Puget Sound Energy, Inc., as
Transmission Provider, tendered for filing a Service Agreement for Firm
Point-to-Point Transmission Service (Firm Point-to-Point Service
Agreement) and a Service Agreement for Non-Firm Point-to-Point
Transmission Service (Non-Firm Point-to-Point Service Agreement) with
Vitol Gas & Electric LLC (VG&E), as Transmission Customer. A copy of
the filing was served upon VG&E.
Comment date: December 17, 1997, in accordance with Standard
Paragraph E at the end of this notice.
18. Puget Sound Energy, Inc.
[Docket No. ER98-657-000]
Take notice that on November 13, 1997, Puget Sound Energy, Inc., as
Transmission Provider, tendered for filing a Service Agreement for Firm
Point-to-Point Transmission Service (Firm Point-to-Point Service
Agreement) and a Service Agreement for Non-Firm Point-to-Point
Transmission Service (Non-Firm Point-to-Point Service Agreement) with
Western Resources, Inc. (Western), as Transmission Customer. A copy of
the filing was served upon Western.
Comment date: December 17, 1997, in accordance with Standard
Paragraph E at the end of this notice.
19. Puget Sound Energy, Inc.
[Docket No. ER98-658-000]
Take notice that on November 13, 1997, Puget Sound Energy, Inc., as
Transmission Provider, tendered for filing a Service Agreement for Firm
Point-to-Point Transmission Service (Firm Point-to-Point Service
Agreement) and a Service Agreement for Non-Firm Point-to-Point
Transmission Service (Non-Firm Point-to-Point Service Agreement) with
Williams Energy Services Company (Williams), as Transmission Customer.
A copy of the filing was served upon Williams.
Comment date: December 17, 1997, in accordance with Standard
Paragraph E at the end of this notice.
20. Puget Sound Energy, Inc.
[Docket No. ER98-659-000]
Take notice that on November 13, 1997, Puget Sound Energy, Inc., as
Transmission Provider, tendered for filing a Service Agreement for Firm
Point-to-Point Transmission Service (Firm Point-to-Point Service
Agreement) and a Service Agreement for Non-Firm Point-to-Point
Transmission Service (Non-Firm Point-to-Point Service Agreement) with
Edison Source (Edison), as Transmission Customer. A copy of the filing
was served upon Edison.
Comment date: December 17, 1997, in accordance with Standard
Paragraph E at the end of this notice.
21. Puget Sound Energy, Inc.
[Docket No. ER98-660-000]
Take notice that on November 13, 1997, Puget Sound Energy, Inc., as
Transmission Provider, tendered for filing a Service Agreement for Firm
Point-to-Point Transmission Service (Firm Point-to-Point Service
Agreement) and a Service Agreement for Non-Firm Point-to-Point
Transmission Service (Non-Firm Point-to-Point Service Agreement) with
Public Utility District No. 1 of Chelan County (Chelan), as
Transmission Customer. A copy of the filing was served upon Chelan.
Comment date: December 17, 1997, in accordance with Standard
Paragraph E at the end of this notice.
22. Puget Sound Energy, Inc.
[Docket No. ER98-661-000]
Take notice that on November 13, 1997, Puget Sound Energy, Inc., as
Transmission Provider, tendered for filing a Service Agreement for Firm
Point-to-Point Transmission Service (Firm Point-to-Point Service
Agreement) and a Service Agreement for Non-Firm Point-to-Point
Transmission Service (Non-Firm Point-to-Point Service Agreement) with
TransAlta Energy Marketing Corporation (TransAlta), as Transmission
Customer. A copy of the filing was served upon TransAlta.
Comment date: December 17, 1997, in accordance with Standard
Paragraph E at the end of this notice.
Standard Paragraph
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 888 First Street, N.E., Washington, DC 20426, in
accordance with Rules 211 and 214 of the Commission's Rules of Practice
and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such motions or
protests should be filed on or before the comment date. Protests will
be considered by the Commission in determining the appropriate action
to be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a motion to
intervene. Copies of this filing are on file with the Commission and
are available for public inspection.
Lois D. Cashell,
Secretary.
[FR Doc. 97-32323 Filed 12-9-97; 8:45 am]
BILLING CODE 6717-01-P