DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP98-91-000]
Florida Gas Transmission Company; Notice of Request Under Blanket
Authorization
November 20, 1997.
Take notice that on November 14, 1997, Florida Gas Transmission
Company (FGT), 1400 Smith Street, P.O. Box 1188, Houston, Texas 77251-
1188, filed in Docket No. CP98-91-000 a request pursuant to Sections
157.205 and 157.212 of the Commission's Regulations under the Natural
Gas Act (18 CFR 157.205 and 18 CFR 157.212) for authorization to
construct, own, and operate a lateral and a new meter station in Pasco
County, Florida, under FGT's blanket certificate issued in Docket No.
CP82-553-000 pursuant to Section 7 of the Natural Gas Act, all as more
fully set forth in the request that is on file with the Commission and
open to public inspection.
FGT proposes to construct a new meter station to serve Florida
Power Corporation (FPC) at the FPC Anmclote Plant and a new lateral to
extend from FGT's 30-inch West leg to the FPC Anclote Plant. The meter
station is expected to accommodate the current
[[Page 63142]]
and future anticipated volumes of up to 100,000 MMBtu per day of
natural gas. FGT estimates the cost of the construction of the proposed
lateral at $13,363,000, of which amount FGT would not be reimbursed,
and the construction cost related to the meter station to be $465,000,
of which FGT would be reimbursed, exclusive of tax gross up.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to
the request. If no protest is filed within the time allowed therefor,
the proposed activity shall be deemed to be authorized effective the
day after the time allowed for filing a protest. If a protest is filed
and not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
Lois D. Cashell,
Secretary.
[FR Doc. 97-31002 Filed 11-25-97; 8:45 am]