DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission
[Docket No. CP98-76-000]


Koch Gateway Pipeline Company; Notice of Request Under Blanket 
Authorization

November 18, 1997.
    Take notice that on November 10, 1997, Koch Gateway Pipeline 
Company, (Koch Gateway) P.O. Box 1478, Houston, Texas 77251-1478, filed 
in the above docket a request pursuant to Sections 157.205 and 
157.211(a)(2) of the Commission's Regulations, under its blanket 
certificate issued in Docket No. CP82-430-000 for authorization to 
operate as a jurisdictional facility in interstate commerce a dual 3-
inch meter tube previously installed, operated and placed in service 
under Section 311(a) of the Natural Gas Policy Act (NGPA) and Section 
284.3(c) of the Commission's regulations, all as more fully set forth 
in the request which is on file with the Commission and open to public 
inspection.
    Koch Gateway states that the proposed certification of facilities 
will enable Koch Gateway to provide transportation services under its 
blanket transportation certificate through a tap serving Entex, Inc. 
(Entex), a local distribution company in Montgomery County, Texas. Koch 
Gateway further states that it will operate the proposed facilities in 
compliance with 18 CFR, Part 157, Subpart F, and that the proposed 
facilities will not affect its ability to service its other existing 
customers.
    Any person or the Commission's staff may, within 45 days after 
issuance of the instant notice by the Commission, file pursuant to Rule 
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
intervene or notice of intervention and pursuant to Section 157.205 a 
protest to the request. If no protest is filed within the time allowed 
therefor, the proposed activity shall be deemed to be authorized 
effective the day after the time allowed for filing a protest. If a 
protest is filed and not withdrawn within 30 days after the time 
allowed for filing a protest, the instant request shall be treated as 
an application for authorization pursuant to Section 7 of the Natural 
Gas Act.
Lois D. Cashell,
Secretary.
[FR Doc. 97-30741 Filed 11-21-97; 8:45 am]