[Federal Register Volume 62, Number 197 (Friday, October 10, 1997)]
[Notices]
[Page 52997]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 97-27024]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-5485-2]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared September 08, 1997 Through
September 12, 1997 pursuant to the Environmental Review Process (ERP),
under Section 309 of the Clean Air Act and Section 102(2)(c) of the
National Environmental Policy Act as amended. Requests for copies of
EPA comments can be directed to the OFFICE OF FEDERAL ACTIVITIES AT
(202) 564-71653.
An explanation of the ratings assigned to draft environmental
impact statements (EISs) was published in FR dated April 11, 1997 (62
FR 16154).
Draft EISs
ERP No. D-BLM-K67044-CA Rating EC2, Soledad Mountain Open Pit Leap
Leach Gold Mine Project, Construction and Operation, Plan-of-Operations
Approval, Mojave, Kern County, CA.
Summary: EPA expressed environmental concerns with the lack of full
disclosure of environmental impacts from proposed or possible future
sale of aggregate, underground mining, and impacts to local water and
air quality from mining and processing operations.
ERP No. D-FAA-G12002-NM Rating EC2, Southwest Regional Spaceport
(SRS) Development and Operation Project, Commercial Space Vehicles
Launching Facility, Licensing, Sierra and Dona Ana Counties, NM.
Summary: EPA expressed environmental concerns and requested
additional information on land use change, policy, and management
conflict.
ERP No. D-NPS-K61144-HI Rating LO, Ala Kahakai ``Trail By the Sea''
National Trail Study, Implementation, Hawaii Island, Hawaii County, HI.
Summary: EPA expressed lack of objection on the proposed project.
ERP No. D-SFW-L64045-00 Rating LO, Grizzly Bear (Ursus arctos
horribilus) Recovery Plan in the Bitterroot Ecosystem, Implementation,
Endangered Species Act, Proposed Special Rule 10(j) Establishment of a
Nonessential Experimental Population of Grizzly Bears in the Bitterroot
Area, Rocky Mountain, Blaine, Camas, Boise, Clearwater, Custer, Elmore,
Idaho, Lemhi, Shoshone.
Summary: Based on an abbreviated review EPA does not foresee having
any environmental objections to the proposed project.
ERP No. DA-DOE-K03007-CA Rating EC2, Petroleum Production at
Maximum Efficient Rate, Updated Information for the Sale of Naval
Petroleum Reserve No. 1 (NPR-1 also called ``Elk Hills'') Amendment of
Kern County General Plan, Elk Hills, Kern County, CA.
Summary: EPA expressed environmental concerns regarding projected
air quality impacts with the disposition of EPA-regulated
polychlorinated biphenyls in storage or in use at the facility, and
projected impacts to biological resources. EPA asked to be notified of
the final disposition of regulated PCB materials at the facility and
encouraged the Department of Energy to work with the US Fish and
Wildlife Service on mitigation recommendations in the EIS to reduce
projected impacts to biological resources, particularly Federally-
listed species.
Final EISs
ERP No. F-AFS-L65287-OR, Little River (DEMO) Demonstration of
Ecosystem Management Options Timber Sale, Implementation Umpqua
National Forest, North Umpqua Ranger District, Douglas County, OR.
Summary: Review of the Final EIS was not deemed necessary. No
formal comment letter was sent to the preparing agency.
ERP No. F-NAS-E12005-00, Engine Technology Support, Implementation,
With Emphases on Liquid Oxygen and Kerosene, Advanced Space
Transportation Program, Test Sites: Marshall Space Flight Center (MSFC)
in Huntsville, AL; Stennis Space Center (SSC) near Bay St. Louis, MS
and Phillips Laboratory, Edward Air Force Base, CA.
Summary: EPA continues to prefer the SSC for rocket motor testing
based on the lesser noise impacts affecting private property.
ERP No. FS-AFS-L65202-ID, Katka Peak Timber Sale and Road
Construction, Implementation, New Information from Interior Columbia
Basin Ecosystem Management Project, to implement Ecosystem Restoration
Treatment, Bonners Ferry Ranger District, Idaho Panhandle National
Forests, Boundary County, ID.
Summary: Review of the Final EIS was not deemed necessary. No
formal comment letter was sent to the preparing agency.
Dated: October 7, 1997.
B. Katherine Biggs,
Associate Director, NEPA Compliance Division, Office of Federal
Activities.
[FR Doc. 97-27024 Filed 10-9-97; 8:45 am]
BILLING CODE 6560-50-U