EPA Comments
Availability of EPA comments prepared August 4, 1997 Through August
8, 1997 pursuant to the Environmental Review Process (ERP), under
Section 309 of the Clean Air Act and Section 102(2)(c) of the National
Environmental Policy Act as amended. Requests for copies of EPA
comments can be directed to the OFFICE OF FEDERAL ACTIVITIES at (202)
564-7167. An explanation of the ratings assigned to draft environmental
impact statements (EISs) was published in FR dated April 4, 1997 (62 FR
16154).
Draft EISs
ERP No. D-FHW-K40142-CA Rating EC2, CA-4 ``GAP'' Closure Project,
Improvements between I-80 and Cunninings Skyway, Funding, NPDES Permit
and COE Section 404 Permit, City of Hercules, Contra Costa County, CA.
Summary: EPA expressed environmental concerns due to: a need for
additional information regarding wetlands, water and biological
resources and air quality data and analysis.
ERP No. D-FHW-K40224-CA Rating EU3, I-880/CA-92 Interchange
Reconstruction, I-880 from Winton Avenue to Tennyson Road and CA-92
from Hesperian Boulevard to Santa Clara Street, Funding, City of
Hayward, Alameda County, CA.
Summary: EPA found the DEIS for the I-880/92 interchange project to
have inadequate information because the DEIS did not account for the
related SR 92 San Mateo-Hayward bridge widening project which had been
analyzed in a separate document. EPA believes the two projects should
be analyzed together as one since both are dependent on one another,
and that the information did not present a complete picture of the
impacts to the public and to the decisionmaker.
ERP No. D-FHW-K40225-CA Rating EC2, Marin US-101 High Occupancy
Vehicle (HOV) Gap Closure Project, Construction from US 101 I-580 on
US-101 from Lucky Drive to North San Pedro Road and I-580 from Irene
Street to US-101, Funding, COE Section 404 and Bridge Permits, Marin
County, CA.
Summary: EPA expressed environmental concerns regarding potential
air quality impacts, relocation of the San Rafael Viaduct, impacts to
the future rail project, minimization of impacts of coastal zone
resources, and indirect impacts.
ERP No. D-TVA-E09803-MS Rating EC2, Exercise of Option Purchase
Agreement with LSP Energy Limited Partnership for Supply of Electric
Energy, Construction and Operation, Batesville Generation Facility,
Funding, COE Section 10 and 404 Permits and NPDES Permit, City of
Batesville, Coahoma, Panola, Quitman and Yalobusha Counties, MS.
Summary: EPA's primary concern involves the fact that the proposed
power plant site is not close to waterbodies required for process water
supply and discharge, so that pipeline interconnection with associated
impacts (including loss of forested wetlands) are proposed.
Final EISs
ERP No. F-FHW-J40140-MT, US 93 Highway Transportation Improvements,
between Hamilton (Milepost 49.0) to Lolo (Milepost 83.2), Funding and
COE Section 404 Permit, Ravalli and Missoula Counties, MT.
Summary: EPA expressed environmental concerns regarding potential
induced and hastened changes in the pattern of land use, population
density or growth rate of the Bitteroot Valley resulting indirectly
from the project and potential adverse effects to wetlands, riparian
areas, wildlife habitat, and other natural systems, including
ecosystems.
Dated: August 26, 1997.
B. Katherine Biggs,
Associate Director, Office of Federal Activities.