[Federal Register Volume 62, Number 133 (Friday, July 11, 1997)]
[Notices]
[Pages 37223-37227]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 97-18189]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EG97-73-000, et al.]
Zond Windsystem Partners, Ltd., et al.; Electric Rate and
Corporate Regulation Filings
July 3, 1997.
Take notice that the following filings have been made with the
Commission:
1. Zond Windsystem Partners, Ltd. Series 85-B, a California Limited
Partnership
[Docket No. EG97-73-000]
On June 27, 1997, Zond Windsystem Partners, Ltd. Series 85-B, a
California Limited Partnership (Series 85-B Partnership), 13000 Jameson
Road, Tehachapi, California 93561, filed with the Federal Energy
Regulatory Commission an application for determination of exempt
wholesale generator status pursuant to Part 365 of the Commission's
Regulations.
Series 85-B Partnership owns wind-powered eligible facilities
(along with certain appurtenant interconnected transmission
facilities), located in or near Tehachapi, California.
Comment date: July 23, 1997, in accordance with Standard Paragraph
E at the end of this notice. The Commission will limit its
consideration of comments to those that concern the adequacy or
accuracy of the application.
2. Zond-PanAero Windsystem Partners a California Limited
Partnership
[Docket No. EG97-74-000]
On June 27, 1997, Zond-PanAero Windsystem Partners I, a California
limited partnership (ZPW I), 13000 Jameson Road, Tehachapi, California
93561, filed with the Federal Energy Regulatory Commission an
application for determination of exempt wholesale generator status
pursuant to Part 365 of the Commission's Regulations.
ZPW I owns wind-powered eligible facilities (along with certain
appurtenant interconnected transmission facilities), located in or near
Palm Springs California.
[[Page 37224]]
Comment date: July 23, 1997, in accordance with Standard Paragraph
E at the end of this notice. The Commission will limit its
consideration of comments to those that concern the adequacy or
accuracy of the application.
3. Zond-PanAero Windsystem Partners II, a California Limited
Partnership
[Docket No. EG97-75-000]
On June 27, 1997, Zond-PanAero Windsystem Partners II, a California
limited partnership (ZPW II), 13000 Jameson Road, Tehachapi, California
93561, filed with the Federal Energy Regulatory Commission an
application for determination of exempt wholesale generator status
pursuant to Part 365 of the Commission's Regulations.
ZPW II owns wind-powered eligible facilities (along with certain
appurtenant interconnected transmission facilities), located in or near
Palm Springs, California.
Comment date: July 23, 1997, in accordance with Standard Paragraph
E at the end of this notice. The Commission will limit its
consideration of comments to those that concern the adequacy or
accuracy of the application.
4. Zond Systems, Inc.
[Docket No. EG97-76-000]
On June 27, 1997, Zond Systems, Inc. (Zond Systems), 13000 Jameson
Road, Tehachapi, California 93561, filed with the Federal Energy
Regulatory Commission an application for determination of exempt
wholesale generator status pursuant to Part 365 of the Commission's
Regulations.
Zond Systems has direct and indirect ownership interests in and
operates wind-powered eligible facilities (along with certain
appurtenant interconnecting transmission facilities), located in or
near Tehachapi, Palm Springs, and Santa Clara, California. Zond Systems
also operates wind-powered eligible facilities, located in or near
Tehachapi, Palm Springs, and Santa Clara California, on behalf of
third-party owners.
Comment date: July 23, 1997, in accordance with Standard Paragraph
E at the end of this notice. The Commission will limit its
consideration of comments to those that concern the adequacy or
accuracy of the application.
5. Zond Windsystem Partners, Ltd. Series 85-A, a California Limited
Partnership
[Docket No. EG97-77-000]
On June 27, 1997, Zond Windsystem Partners, Ltd. Series 85-A, a
California Limited Partnership (Series 85-A Partnership), 13000 Jameson
Road, Tehachapi, California 93561, filed with the Federal Energy
Regulatory Commission an application for determination of exempt
wholesale generator status pursuant to Part 365 of the Commission's
Regulations.
Series 85-A Partnership owns wind-powered eligible facilities
(along with certain appurtenant interconnected transmission
facilities), located in or near Tehachapi, California.
Comment date: July 23, 1997, in accordance with Standard Paragraph
E at the end of this notice. The Commission will limit its
consideration of comments to those that concern the adequacy or
accuracy of the application.
6. Zond Windsystem Partners, Ltd. Series 85-C, a California Limited
Partnership
[Docket No. EG97-78-000]
On June 27, 1997, Zond Windsystem Partners, Ltd. Series 85-C, a
California Limited Partnership (Series 85-C Partnership), 13000 Jameson
Road, Tehachapi, California 93561, filed with the Federal Energy
Regulatory Commission an application for determination of exempt
wholesale generator status pursuant to Part 365 of the Commission's
Regulations.
Series 85-C Partnership owns wind-powered eligible facilities
(along with certain appurtenant interconnected transmission
facilities), located in or near Santa Clara California.
Comment date: July 23, 1997, in accordance with Standard Paragraph
E at the end of this notice. The Commission will limit its
consideration to those that concern the adequacy or accuracy of the
application.
7. Virginia Electric and Power Company
[Docket No. ER97-2275-000]
Take notice that on June 23, 1997, Virginia Electric and Power
Company tendered for filing an amendment in the above-referenced
docket.
Comment date: July 14, 1997, in accordance with Standard Paragraph
E at the end of this notice.
8. Wisconsin Electric Power Company
[Docket No. ER97-2696-000]
Take notice that on June 13, 1997, Wisconsin Electric Power Company
tendered for filing additional information in the above-referenced
docket.
Comment date: July 17, 1997, in accordance with Standard Paragraph
E at the end of this notice.
9. Wisconsin Power & Light Company
[Docket No. ER97-2936-000]
Take notice that on June 20, 1997, Wisconsin Power & Light Company
(WP&L) tendered for filing a temporary revision to its Emergency
Service Schedules in its Bulk Power Sales Tariff and its
Interconnection/Interchange Agreements with Wisconsin Electric Power
Company, Madison Gas and Electric, and Wisconsin Public Power Inc.
SYSTEM. This change will allow WP&L to recover costs incurred in the
Share the Pain program. WP&L is requesting an effective date of May 15,
1997, and a termination date of September 30, 1997.
Comment date: July 17, 1997, in accordance with Standard Paragraph
E at the end of this notice.
10. Florida Power Corporation
[Docket No. ER97-3251-000]
Take notice that on June 25, 1997, Florida Power Corporation
tendered for filing a notice of withdrawal of its filing made on June
5, 1997, in the above-referenced docket. The filing contained a service
agreement providing for service to Morgan Stanley Capital Group, Inc.,
pursuant to Florida Power's Cost-Based Wholesale Power Sales Tariff
(CR-1)(Tariff). The Commission rejected Florida Power's CR-1 Tariff.
Florida Power therefore, wishes to withdraw its filing made in the
above-referenced docket.
Comment date: July 17, 1997, in accordance with Standard Paragraph
E at the end of this notice.
11. Central Power and Light Company, West Texas Utilities Company,
Public Service Company of Oklahoma, Southwestern Electric Power Co.
[Docket No. ER97-3360-000]
Take notice that on June 18, 1997, Central Power and Light Company,
West Texas Utilities Company, Public Service Company of Oklahoma and
Southwestern Electric Power Company (collectively, the CSW Operating
Companies) submitted for filing service agreements under which the CSW
Operating Companies will provide transmission and ancillary services to
Aquila Power Corporation (Aquila), PacifiCorp Power Marketing, Inc.
(PacifiCorp), PanEnergy Trading and Market Services, L.L.C. (PanEnergy
Trading), PECO Energy Company-Power Team (PECO), Southern Energy
Trading and Marketing, Inc. (Southern), Tenaska Power Services Co.
(Tenaska), Williams Energy Services Company (Williams) and Wisconsin
Electric Power Company (Wisconsin), in accordance with the
[[Page 37225]]
CSW Operating Companies' open access transmission service tariff.
The CSW Operating Companies state that a copy of this filing has
been served on PacifiCorp, Southern, Wisconsin, PanEnergy Trading,
PECO, Tenaska, Williams and Aquila.
Comment date: July 17, 1997, in accordance with Standard Paragraph
E at the end of this notice.
12. Indianapolis Power & Light Company
[Docket No. ER97-3361-000]
Take notice that on June 18, 1997, Indianapolis Power & Light
Company (IPL), tendered for filing a power sales agreement executed
between IPL and Commonwealth Edison Company.
Copies of this filing were sent to the Indiana Utility Regulatory
Commission and Commonwealth Edison Company.
Comment date: July 17, 1997, in accordance with Standard Paragraph
E at the end of this notice.
13. The Washington Water Power Company
[Docket No. ER97-3362-000]
Take notice that on June 17, 1997, The Washington Water Power
Company (WWP), tendered for filing with the Federal Energy Regulatory
Commission pursuant to 18 CFR 35.13 a revision to its Rate Schedule
FERC No. 155. WWP requests an effective date of September 1, 1997.
Copies of this filing have been served upon Puget Sound Energy, the
City of Spokane, and the Washington Utilities and Transportation
Commission.
Comment date: July 17, 1997, in accordance with Standard Paragraph
E at the end of this notice.
14. Union Electric Company
[Docket No. ER97-3363-000]
Take notice that on June 17, 1997, Union Electric Company, tendered
for filing a Notice of Cancellation of the Firm Point-to-Point
Transmission Service Agreement dated April 8, 1997 between Union
Electric Company and Illinois Power Company.
Union requests that this cancellation become effective April 9,
1997.
Comment date: July 17, 1997, in accordance with Standard Paragraph
E at the end of this notice.
15. Union Electric Company
[Docket No. ER97-3364-000]
Take notice that on June 17, 1997, Union Electric Company, tendered
for filing a Notice of Cancellation of the Firm Point-to-Point
Transmission Service Agreement between Union Electric Company and
Illinois Power Company.
Union requests that this cancellation become effective April 10,
1997.
Comment date: July 17, 1997, in accordance with Standard Paragraph
E at the end of this notice.
16. Union Electric Company
[Docket No. ER97-3365-000]
Take notice that on June 17, 1997, Union Electric Company, tendered
for filing a Notice of Cancellation of the Firm Point-to-Point
Transmission Service Agreement between Union Electric Company and
Rainbow Energy Marketing Corporation.
Union requests that this cancellation become effective April 22,
1997.
Comment date: July 17, 1997, in accordance with Standard Paragraph
E at the end of this notice.
17. Union Electric Company
[Docket No. ER97-3366-000]
Take notice that on June 17, 1997, Union Electric Company, tendered
for filing a Notice of Cancellation of the firm Point-to-Point
Transmission Service Agreement between Union Electric Company and Koch
Energy Trading, Inc.
Union requests that this cancellation become effective April 29,
1997.
Comment date: July 17, 1997, in accordance with Standard Paragraph
E at the end of this notice.
18. Union Electric Company
[Docket No. ER97-3367-000]
Take notice that on June 17, 1997, Union Electric Company, tendered
for filing a Notice of Cancellation of the Firm Point-to-Point
Transmission Service Agreement between Union Electric Company and
Illinois Power Company.
Union requests that this cancellation become effective June 1,
1997.
Comment date: July 17, 1997, in accordance with Standard Paragraph
E at the end of this notice.
19. Central Louisiana Electric Company, Inc.
[Docket No. ER97-3368-000]
Take notice that on June 18, 1997, Central Louisiana Electric
Company, Inc., (CLECO), tendered for filing a service agreement under
CLECO's Market-Based Rate MR-1 Power Sales Tariff with Progress Power
Marketing, Inc. CLECO states that the service agreement will enable
CLECO to engage in market-based rate transactions with Progress Power
Marketing, Inc.
CLECO states that a copy of the filing has been served on Progress
Power Marketing, Inc.
Comment date: July 17, 1997, in accordance with Standard Paragraph
E at the end of this notice.
20. Central Illinois Public Service Company
[Docket No. ER97-3369-000]
Take notice that on June 18, 1997, Central Illinois Public Service
Company (CIPS) submitted a service agreement, dated June 9, 1997,
establishing NP Energy, Inc. as a customer under the terms of CIPS'
Open Access Transmission Tariff.
CIPS requests an effective date of June 9, 1997 for the service
agreement. Accordingly, CIPS requests waiver of the Commission's notice
requirements. Copies of this filing were served upon NP Energy, Inc.
and the Illinois Commerce Commission.
Comment date: July 17, 1997, in accordance with Standard Paragraph
E at the end of this notice.
21. Arizona Public Service Company
[Docket No. ER97-3370-000]
Take notice that on June 19, 1997, Arizona Public Service Company
(APS), tendered for filing a revised Contract Demand Exhibit for the
Bureau of Indian Affairs (BIA) on behalf of the San Carlos Irrigation
Project applicable under the FERC Rate Schedule No. 201.
Current rate levels are unaffected, revenue levels are unchanged
from those currently on file with the Commission, and no other
significant change in service to these or any other customer results
from the revisions proposed herein. No new or modifications to existing
facilities are required as a result of these revisions.
Copies of this filing have been served on the BIA and the Arizona
Corporation Commission.
Comment date: May 5, 1997, in accordance with Standard Paragraph E
at the end of this notice.
22. Rochester Gas and Electric Corporation
[Docket No. ER97-3371-000]
Take notice that on June 18, 1997, Rochester Gas and Electric
Corporation (RG&E), filed a Service Agreement between RG&E and the PECO
Energy Company-Power Team (Customer). This Service Agreement specifies
that the Customer has agreed to the rates, terms and conditions of the
RG&E open access transmission tariff filed on July 9, 1996 in Docket
No. OA96-141-000.
RG&E requests waiver of the Commission's sixty (60) day notice
requirements and an effective date of June 9, 1997 for the PECO Energy
Company-Power Team Service
[[Page 37226]]
Agreement. RG&E has served copies of the filing on the New York State
Public Service Commission and on the Customer.
Comment date: July 17, 1997, in accordance with Standard Paragraph
E at the end of this notice.
23. Eastern Edison Company
[Docket No. ER97-3372-000]
Take notice that on June 18, 1997, Eastern Edison Company (Eastern
Edison), filed an Interconnection Agreement between itself and the
Massachusetts Bay Transportation Authority (MBTA) in order for the MBTA
to take delivery at locations within Eastern Edison's service territory
of power purchased by the MBTA from Boston Edison Company. The
Agreement provides for Eastern Edison to construct interconnection
facilities and for the MBTA to make a contribution-in-aid-of-
construction (CIAC).
Eastern Edison requests that this filing be accepted to become
effective 60 days from today, on August 18, 1997.
Comment date: July 17, 1997, in accordance with Standard Paragraph
E at the end of this notice.
24. PacifiCorp
[Docket No. ER97-3373-000]
Take notice that on June 19, 1997, PacifiCorp, tendered for filing
in accordance with 18 CFR Part 35 of the Commission's Rules and
Regulations, Non-Firm Transmission Service Agreement with E Prime, Inc.
and PECO Energy Company under PacifiCorp's FERC Electric Tariff,
Original Volume No. 11.
Copies of this filing were supplied to the Washington Utilities and
Transportation Commission and the Public Utility Commission of Oregon.
A copy of this filing may be obtained from PacifiCorp's Regulatory
Administration Department's Bulletin Board System through a personal
computer by calling (503) 464-6122 (9600 baud, 8 bits, no parity, 1
stop bit).
Comment date: July 17, 1997, in accordance with Standard Paragraph
E at the end of this notice.
25. Ohio Edison Company, Ohio Power Company
[Docket No. ER97-3374-000]
Take notice that on June 18, 1997, Ohio Edison Company, tendered
for filing on behalf of itself and Ohio Power Company, an amendment to
an Agreement dated June 20, 1968, between the companies related to
electric service to Buckeye Power Inc. The amendment provides for
changes to their Agreement as a result of the merger of two members of
Buckeye Power Inc. (Delaware Rural Electric Cooperative, Inc. and
Morrow Electric Cooperative, Inc.) to become Consolidated Electric
Cooperative, Inc.
Comment date: July 17, 1997, in accordance with Standard Paragraph
E at the end of this notice.
26. Ohio Edison Company, Pennsylvania Power Company
[Docket No. ER97-3375-000]
Take notice that on June 18, 1997, Ohio Edison Company, tendered
for filing on behalf of itself and Pennsylvania Power Company, a
Service Agreement with Southern Energy Trading and Marketing, Inc.
under Ohio Edison's Power Sales Tariff. This filing is made pursuant to
Sec. 205 of the Federal Power Act.
Comment date: July 17, 1997, in accordance with Standard Paragraph
E at the end of this notice.
27. Central Illinois Public Service Company
[Docket No. ER97-3376-000]
Take notice that on June 18, 1997, Central Illinois Public Service
Company (CIPS), submitted an umbrella short-term firm transmission
service agreement, dated April 9, 1997, establishing CIPS Generation
Resources as a customer under the terms of CIPS' Open Access
Transmission Tariff.
CIPS requests an effective date of May 19, 1997 for the service
agreement. Accordingly, CIPS requests waiver of the Commission's notice
requirements. Copies of this filing were served upon the Illinois
Commerce Commission.
Comment date: July 17, 1997, in accordance with Standard Paragraph
E at the end of this notice.
28. Allegheny Power Service Corporation, on behalf of Monongahela Power
Company, The Potomac Edison Company and West Penn Power Company
(Allegheny Power)
[Docket No. ER97-3377-000]
Take notice that on June 18, 1997, Allegheny Power Service
Corporation on behalf of Monongahela Power Company, The Potomac Edison
Company and West Penn Power Company (Allegheny Power) filed Supplement
No. 25 to add one (1) new Customer to the Standard Generation Service
Rate Schedule under which Allegheny Power offers standard generation
and emergency service on an hourly, daily, weekly, monthly or yearly
basis. Allegheny Power requests a waiver of notice requirements to make
service available as of June 17, 1997, to Southern Energy Trading and
Marketing, Inc.
Copies of the filing have been provided to the Public Utilities
Commission of Ohio, the Pennsylvania Public Utility Commission, the
Maryland Public Service Commission, the Virginia State Corporation
Commission, the West Virginia Public Service Commission, and all
parties of record.
Comment date: July 17, 1997, in accordance with Standard Paragraph
E at the end of this notice.
29. Kentucky Utilities Company
[Docket No. ER97-3378-000]
Take notice that on June 18, 1997, Kentucky Utilities Company (KU),
tendered for filing five (5) Supplements to FERC Rate Schedule 203, the
Interconnection Agreement between KU and East Kentucky Power
Cooperative.
Comment date: July 17, 1997, in accordance with Standard Paragraph
E at the end of this notice.
30. Carolina Power & Light Company
[Docket No. ER97-3379-000]
Take notice that on June 19, 1997, Carolina Power & Light Company
(CP&L), tendered for filing Service Agreements for Non-Firm Point-to-
Point Transmission Service executed between CP&L and the following
Eligible Transmission Customers: NorAm Energy Services, Inc.; and NP
Energy, Inc. Service to each Eligible Customer will be in accordance
with the terms and conditions of Carolina Power & Light Company's Open
Access Transmission Tariff.
Copies of the filing were served upon the North Carolina Utilities
Commission and the South Carolina Public Service Commission.
Comment date: July 17, 1997, in accordance with Standard Paragraph
E at the end of this notice.
31. Carolina Power & Light Company
[Docket No. ER97-3380-000]
Take notice that on June 19, 1997, Carolina Power & Light Company
(Carolina), tendered for filing executed Service Agreements between
Carolina and the following Eligible Entities: NP Energy Inc.; and
Consumers Power Company and the Detroit Edison Company referred to
collectively as the Michigan Companies. Service to each Eligible Entity
will be in accordance with the terms and conditions of Carolina's
Tariff No. 1 for Sales of Capacity and Energy.
Copies of the filing were served upon the North Carolina Utilities
Commission and the South Carolina Public Service Commission.
[[Page 37227]]
Comment date: July 17, 1997, in accordance with Standard Paragraph
E at the end of this notice.
32. New England Power Company
[Docket No. ER97-3381-000]
Take notice that on June 19, 1997, New England Power Company (NEP)
filed a Service Agreement with Edison Source for non-firm, point-to-
point transmission service under NEP's open access transmission tariff,
FERC Electric Tariff, Original Volume No. 9.
Comment date: July 17, 1997, in accordance with Standard Paragraph
E at the end of this notice.
33. New England Power Company
[Docket No. ER97-3382-000]
Take notice that on June 19, 1997, New England Power Company (NEP)
filed a supplement to its Network Integration Service Agreement with
Holden (Mass.) Municipal Light Department under NEP's open access
transmission tariff, FERC Electric Tariff, Original Volume No. 9.
Comment date: July 17, 1997, in accordance with Standard Paragraph
E at the end of this notice.
34. Kansas City Power & Light Company
[Docket No. ER97-3383-000]
Take notice that on June 19, 1997, Kansas City Power & Light
Company (KCPL), tendered for filing a Service Agreement dated May 19,
1997, between KCPL and PECO Energy Company--Power Team. KCPL proposes
an effective date of June 4, 1997, and requests waiver of the
Commission's notice requirement. This Agreement provides for the rates
and charges for Non-Firm Transmission Service.
In its filing, KCPL states that the rates included in the above-
mentioned Service Agreement are KCPL's rates and charges in the
compliance filing to FERC Order 888 in Docket No. OA96-4-000.
Comment date: July 17, 1997, in accordance with Standard Paragraph
E at the end of this notice.
35. Kansas City Power & Light Company
[Docket No. ER97-3384-000]
Take notice that on June 19, 1997, Kansas City Power & Light
Company (KCPL), tendered for filing a Service Agreement dated May 14,
1997, between KCPL and Williams Energy Services Company. KCPL proposes
an effective date of June 2, 1997, and requests waiver of the
Commission's notice requirement. This Agreement provides for the rates
and charges for Non-Firm Transmission Service.
In its filing, KCPL states that the rates included in the above-
mentioned Service Agreement are KCPL's rates and charges in the
compliance filing to FERC Order 888 in Docket No. OA96-4-000.
Comment date: July 17, 1997, in accordance with Standard Paragraph
E at the end of this notice.
36. Additional Signatories to PJM Interconnection, L.L.C. Operating
Agreement
[Docket No. ER97-3385-000]
Take notice that on June 17, 1997, the PJM Interconnection, L.L.C.
(PJM) filed, on behalf of the Members of the LLC, membership
applications of Camden Cogen, L.P. and Williams Energy Services
Company. PJM requests an effective date of June 18, 1997.
Comment date: July 17, 1997, in accordance with Standard Paragraph
E at the end of this notice.
37. Central Maine Power Company
[Docket No. ER97-3390-000]
Take notice that on June 20, 1997, Central Maine Power Company
(Central Maine) tendered for filing with the Federal Energy Regulatory
Commission its Wholesale Market Tariff, FERC Electric Tariff. Under the
tariff, Central Maine may enter into service agreements for the sale at
wholesale of electric capacity and/or energy at negotiated rates and
may conduct transactions pursuant to such service agreements.
Central Maine requests an effective of August 9, 1997, or the date
of approval by the Commission, whichever comes earlier.
Central Maine has served copies of the filing upon the Maine Public
Utilities Commission and the Maine Office of the Public Advocate.
Comment date: July 17, 1997, in accordance with Standard Paragraph
E at the end of this notice.
38. Paul M. Anderson
[Docket No. ID-3055-000]
Take notice that on June 18, 1997, Paul M. Anderson filed an
application for authorization under Section 305(b) of the Federal Power
Act to hold the following positions:
Director: Duke Energy Corporation
Director: Temple-Inland, Inc.
39. Orlando Utilities Commission
[Docket No. NJ97-13-000]
Take notice that on June 26, 1997, Orlando Utilities Commission
tendered for filing for an order declaring that voluntary tariff meets
requirements of Order No. 888.
Comment date: August 1, 1997, in accordance with Standard Paragraph
E at the end of this notice.
40. Lordsburg Limited Partnership
[Docket No. EG97-72-000]
On June 26, 1997, Lordsburg Limited Partnership, 820 Gessner, Suite
930, Houston, Texas, 77024-4258 (Lordsburg) filed with the Federal
Energy Regulatory Commission an application for determination of exempt
wholesale generator status pursuant to Part 365 of the Commission's
Regulations.
Lordsburg owns a natural gas-fired eligible facility under
development with a capacity of approximately 110 megawatts (along with
certain appurtenant interconnected transmission facilities), to be
located near Lordsburg, New Mexico. Construction of the facility has
not yet commenced.
Comment date: July 23, 1997, in accordance with Standard Paragraph
E at the end of this notice. The Commission will limit its
consideration of comments to those that concern the adequacy or
accuracy of the application.
Standard Paragraph
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426,
in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protests should be filed on or before the comment date.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a motion to intervene. Copies of this filing are on file with the
Commission and are available for public inspection.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 97-18189 Filed 7-10-97; 8:45 am]
BILLING CODE 6717-01-P