[Federal Register Volume 62, Number 133 (Friday, July 11, 1997)]
[Notices]
[Pages 37223-37227]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 97-18189]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission
[Docket No. EG97-73-000, et al.]


Zond Windsystem Partners, Ltd., et al.; Electric Rate and 
Corporate Regulation Filings

July 3, 1997.
    Take notice that the following filings have been made with the 
Commission:

1. Zond Windsystem Partners, Ltd. Series 85-B, a California Limited 
Partnership

[Docket No. EG97-73-000]

    On June 27, 1997, Zond Windsystem Partners, Ltd. Series 85-B, a 
California Limited Partnership (Series 85-B Partnership), 13000 Jameson 
Road, Tehachapi, California 93561, filed with the Federal Energy 
Regulatory Commission an application for determination of exempt 
wholesale generator status pursuant to Part 365 of the Commission's 
Regulations.
    Series 85-B Partnership owns wind-powered eligible facilities 
(along with certain appurtenant interconnected transmission 
facilities), located in or near Tehachapi, California.
    Comment date: July 23, 1997, in accordance with Standard Paragraph 
E at the end of this notice. The Commission will limit its 
consideration of comments to those that concern the adequacy or 
accuracy of the application.

2. Zond-PanAero Windsystem Partners a California Limited 
Partnership

[Docket No. EG97-74-000]

    On June 27, 1997, Zond-PanAero Windsystem Partners I, a California 
limited partnership (ZPW I), 13000 Jameson Road, Tehachapi, California 
93561, filed with the Federal Energy Regulatory Commission an 
application for determination of exempt wholesale generator status 
pursuant to Part 365 of the Commission's Regulations.
    ZPW I owns wind-powered eligible facilities (along with certain 
appurtenant interconnected transmission facilities), located in or near 
Palm Springs California.

[[Page 37224]]

    Comment date: July 23, 1997, in accordance with Standard Paragraph 
E at the end of this notice. The Commission will limit its 
consideration of comments to those that concern the adequacy or 
accuracy of the application.

3. Zond-PanAero Windsystem Partners II, a California Limited 
Partnership

[Docket No. EG97-75-000]

    On June 27, 1997, Zond-PanAero Windsystem Partners II, a California 
limited partnership (ZPW II), 13000 Jameson Road, Tehachapi, California 
93561, filed with the Federal Energy Regulatory Commission an 
application for determination of exempt wholesale generator status 
pursuant to Part 365 of the Commission's Regulations.
    ZPW II owns wind-powered eligible facilities (along with certain 
appurtenant interconnected transmission facilities), located in or near 
Palm Springs, California.
    Comment date: July 23, 1997, in accordance with Standard Paragraph 
E at the end of this notice. The Commission will limit its 
consideration of comments to those that concern the adequacy or 
accuracy of the application.

4. Zond Systems, Inc.

[Docket No. EG97-76-000]

    On June 27, 1997, Zond Systems, Inc. (Zond Systems), 13000 Jameson 
Road, Tehachapi, California 93561, filed with the Federal Energy 
Regulatory Commission an application for determination of exempt 
wholesale generator status pursuant to Part 365 of the Commission's 
Regulations.
    Zond Systems has direct and indirect ownership interests in and 
operates wind-powered eligible facilities (along with certain 
appurtenant interconnecting transmission facilities), located in or 
near Tehachapi, Palm Springs, and Santa Clara, California. Zond Systems 
also operates wind-powered eligible facilities, located in or near 
Tehachapi, Palm Springs, and Santa Clara California, on behalf of 
third-party owners.
    Comment date: July 23, 1997, in accordance with Standard Paragraph 
E at the end of this notice. The Commission will limit its 
consideration of comments to those that concern the adequacy or 
accuracy of the application.

5. Zond Windsystem Partners, Ltd. Series 85-A, a California Limited 
Partnership

[Docket No. EG97-77-000]

    On June 27, 1997, Zond Windsystem Partners, Ltd. Series 85-A, a 
California Limited Partnership (Series 85-A Partnership), 13000 Jameson 
Road, Tehachapi, California 93561, filed with the Federal Energy 
Regulatory Commission an application for determination of exempt 
wholesale generator status pursuant to Part 365 of the Commission's 
Regulations.
    Series 85-A Partnership owns wind-powered eligible facilities 
(along with certain appurtenant interconnected transmission 
facilities), located in or near Tehachapi, California.
    Comment date: July 23, 1997, in accordance with Standard Paragraph 
E at the end of this notice. The Commission will limit its 
consideration of comments to those that concern the adequacy or 
accuracy of the application.

6. Zond Windsystem Partners, Ltd. Series 85-C, a California Limited 
Partnership

[Docket No. EG97-78-000]

    On June 27, 1997, Zond Windsystem Partners, Ltd. Series 85-C, a 
California Limited Partnership (Series 85-C Partnership), 13000 Jameson 
Road, Tehachapi, California 93561, filed with the Federal Energy 
Regulatory Commission an application for determination of exempt 
wholesale generator status pursuant to Part 365 of the Commission's 
Regulations.
    Series 85-C Partnership owns wind-powered eligible facilities 
(along with certain appurtenant interconnected transmission 
facilities), located in or near Santa Clara California.
    Comment date: July 23, 1997, in accordance with Standard Paragraph 
E at the end of this notice. The Commission will limit its 
consideration to those that concern the adequacy or accuracy of the 
application.

7. Virginia Electric and Power Company

[Docket No. ER97-2275-000]

    Take notice that on June 23, 1997, Virginia Electric and Power 
Company tendered for filing an amendment in the above-referenced 
docket.
    Comment date: July 14, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

8. Wisconsin Electric Power Company

[Docket No. ER97-2696-000]

    Take notice that on June 13, 1997, Wisconsin Electric Power Company 
tendered for filing additional information in the above-referenced 
docket.
    Comment date: July 17, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

9. Wisconsin Power & Light Company

[Docket No. ER97-2936-000]

    Take notice that on June 20, 1997, Wisconsin Power & Light Company 
(WP&L) tendered for filing a temporary revision to its Emergency 
Service Schedules in its Bulk Power Sales Tariff and its 
Interconnection/Interchange Agreements with Wisconsin Electric Power 
Company, Madison Gas and Electric, and Wisconsin Public Power Inc. 
SYSTEM. This change will allow WP&L to recover costs incurred in the 
Share the Pain program. WP&L is requesting an effective date of May 15, 
1997, and a termination date of September 30, 1997.
    Comment date: July 17, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

10. Florida Power Corporation

[Docket No. ER97-3251-000]

    Take notice that on June 25, 1997, Florida Power Corporation 
tendered for filing a notice of withdrawal of its filing made on June 
5, 1997, in the above-referenced docket. The filing contained a service 
agreement providing for service to Morgan Stanley Capital Group, Inc., 
pursuant to Florida Power's Cost-Based Wholesale Power Sales Tariff 
(CR-1)(Tariff). The Commission rejected Florida Power's CR-1 Tariff. 
Florida Power therefore, wishes to withdraw its filing made in the 
above-referenced docket.
    Comment date: July 17, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

11. Central Power and Light Company, West Texas Utilities Company, 
Public Service Company of Oklahoma, Southwestern Electric Power Co.

[Docket No. ER97-3360-000]

    Take notice that on June 18, 1997, Central Power and Light Company, 
West Texas Utilities Company, Public Service Company of Oklahoma and 
Southwestern Electric Power Company (collectively, the CSW Operating 
Companies) submitted for filing service agreements under which the CSW 
Operating Companies will provide transmission and ancillary services to 
Aquila Power Corporation (Aquila), PacifiCorp Power Marketing, Inc. 
(PacifiCorp), PanEnergy Trading and Market Services, L.L.C. (PanEnergy 
Trading), PECO Energy Company-Power Team (PECO), Southern Energy 
Trading and Marketing, Inc. (Southern), Tenaska Power Services Co. 
(Tenaska), Williams Energy Services Company (Williams) and Wisconsin 
Electric Power Company (Wisconsin), in accordance with the

[[Page 37225]]

CSW Operating Companies' open access transmission service tariff.
    The CSW Operating Companies state that a copy of this filing has 
been served on PacifiCorp, Southern, Wisconsin, PanEnergy Trading, 
PECO, Tenaska, Williams and Aquila.
    Comment date: July 17, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

12. Indianapolis Power & Light Company

[Docket No. ER97-3361-000]

    Take notice that on June 18, 1997, Indianapolis Power & Light 
Company (IPL), tendered for filing a power sales agreement executed 
between IPL and Commonwealth Edison Company.
    Copies of this filing were sent to the Indiana Utility Regulatory 
Commission and Commonwealth Edison Company.
    Comment date: July 17, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

13. The Washington Water Power Company

[Docket No. ER97-3362-000]

    Take notice that on June 17, 1997, The Washington Water Power 
Company (WWP), tendered for filing with the Federal Energy Regulatory 
Commission pursuant to 18 CFR 35.13 a revision to its Rate Schedule 
FERC No. 155. WWP requests an effective date of September 1, 1997.
    Copies of this filing have been served upon Puget Sound Energy, the 
City of Spokane, and the Washington Utilities and Transportation 
Commission.
    Comment date: July 17, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

14. Union Electric Company

[Docket No. ER97-3363-000]

    Take notice that on June 17, 1997, Union Electric Company, tendered 
for filing a Notice of Cancellation of the Firm Point-to-Point 
Transmission Service Agreement dated April 8, 1997 between Union 
Electric Company and Illinois Power Company.
    Union requests that this cancellation become effective April 9, 
1997.
    Comment date: July 17, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

15. Union Electric Company

[Docket No. ER97-3364-000]

    Take notice that on June 17, 1997, Union Electric Company, tendered 
for filing a Notice of Cancellation of the Firm Point-to-Point 
Transmission Service Agreement between Union Electric Company and 
Illinois Power Company.
    Union requests that this cancellation become effective April 10, 
1997.
    Comment date: July 17, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

16. Union Electric Company

[Docket No. ER97-3365-000]

    Take notice that on June 17, 1997, Union Electric Company, tendered 
for filing a Notice of Cancellation of the Firm Point-to-Point 
Transmission Service Agreement between Union Electric Company and 
Rainbow Energy Marketing Corporation.
    Union requests that this cancellation become effective April 22, 
1997.
    Comment date: July 17, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

17. Union Electric Company

[Docket No. ER97-3366-000]

    Take notice that on June 17, 1997, Union Electric Company, tendered 
for filing a Notice of Cancellation of the firm Point-to-Point 
Transmission Service Agreement between Union Electric Company and Koch 
Energy Trading, Inc.
    Union requests that this cancellation become effective April 29, 
1997.
    Comment date: July 17, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

18. Union Electric Company

[Docket No. ER97-3367-000]

    Take notice that on June 17, 1997, Union Electric Company, tendered 
for filing a Notice of Cancellation of the Firm Point-to-Point 
Transmission Service Agreement between Union Electric Company and 
Illinois Power Company.
    Union requests that this cancellation become effective June 1, 
1997.
    Comment date: July 17, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

19. Central Louisiana Electric Company, Inc.

[Docket No. ER97-3368-000]

    Take notice that on June 18, 1997, Central Louisiana Electric 
Company, Inc., (CLECO), tendered for filing a service agreement under 
CLECO's Market-Based Rate MR-1 Power Sales Tariff with Progress Power 
Marketing, Inc. CLECO states that the service agreement will enable 
CLECO to engage in market-based rate transactions with Progress Power 
Marketing, Inc.
    CLECO states that a copy of the filing has been served on Progress 
Power Marketing, Inc.
    Comment date: July 17, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

20. Central Illinois Public Service Company

[Docket No. ER97-3369-000]

    Take notice that on June 18, 1997, Central Illinois Public Service 
Company (CIPS) submitted a service agreement, dated June 9, 1997, 
establishing NP Energy, Inc. as a customer under the terms of CIPS' 
Open Access Transmission Tariff.
    CIPS requests an effective date of June 9, 1997 for the service 
agreement. Accordingly, CIPS requests waiver of the Commission's notice 
requirements. Copies of this filing were served upon NP Energy, Inc. 
and the Illinois Commerce Commission.
    Comment date: July 17, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

21. Arizona Public Service Company

[Docket No. ER97-3370-000]

    Take notice that on June 19, 1997, Arizona Public Service Company 
(APS), tendered for filing a revised Contract Demand Exhibit for the 
Bureau of Indian Affairs (BIA) on behalf of the San Carlos Irrigation 
Project applicable under the FERC Rate Schedule No. 201.
    Current rate levels are unaffected, revenue levels are unchanged 
from those currently on file with the Commission, and no other 
significant change in service to these or any other customer results 
from the revisions proposed herein. No new or modifications to existing 
facilities are required as a result of these revisions.
    Copies of this filing have been served on the BIA and the Arizona 
Corporation Commission.
    Comment date: May 5, 1997, in accordance with Standard Paragraph E 
at the end of this notice.

22. Rochester Gas and Electric Corporation

[Docket No. ER97-3371-000]

    Take notice that on June 18, 1997, Rochester Gas and Electric 
Corporation (RG&E), filed a Service Agreement between RG&E and the PECO 
Energy Company-Power Team (Customer). This Service Agreement specifies 
that the Customer has agreed to the rates, terms and conditions of the 
RG&E open access transmission tariff filed on July 9, 1996 in Docket 
No. OA96-141-000.
    RG&E requests waiver of the Commission's sixty (60) day notice 
requirements and an effective date of June 9, 1997 for the PECO Energy 
Company-Power Team Service

[[Page 37226]]

Agreement. RG&E has served copies of the filing on the New York State 
Public Service Commission and on the Customer.
    Comment date: July 17, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

23. Eastern Edison Company

[Docket No. ER97-3372-000]

    Take notice that on June 18, 1997, Eastern Edison Company (Eastern 
Edison), filed an Interconnection Agreement between itself and the 
Massachusetts Bay Transportation Authority (MBTA) in order for the MBTA 
to take delivery at locations within Eastern Edison's service territory 
of power purchased by the MBTA from Boston Edison Company. The 
Agreement provides for Eastern Edison to construct interconnection 
facilities and for the MBTA to make a contribution-in-aid-of-
construction (CIAC).
    Eastern Edison requests that this filing be accepted to become 
effective 60 days from today, on August 18, 1997.
    Comment date: July 17, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

24. PacifiCorp

[Docket No. ER97-3373-000]

    Take notice that on June 19, 1997, PacifiCorp, tendered for filing 
in accordance with 18 CFR Part 35 of the Commission's Rules and 
Regulations, Non-Firm Transmission Service Agreement with E Prime, Inc. 
and PECO Energy Company under PacifiCorp's FERC Electric Tariff, 
Original Volume No. 11.
    Copies of this filing were supplied to the Washington Utilities and 
Transportation Commission and the Public Utility Commission of Oregon.
    A copy of this filing may be obtained from PacifiCorp's Regulatory 
Administration Department's Bulletin Board System through a personal 
computer by calling (503) 464-6122 (9600 baud, 8 bits, no parity, 1 
stop bit).
    Comment date: July 17, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

25. Ohio Edison Company, Ohio Power Company

[Docket No. ER97-3374-000]

    Take notice that on June 18, 1997, Ohio Edison Company, tendered 
for filing on behalf of itself and Ohio Power Company, an amendment to 
an Agreement dated June 20, 1968, between the companies related to 
electric service to Buckeye Power Inc. The amendment provides for 
changes to their Agreement as a result of the merger of two members of 
Buckeye Power Inc. (Delaware Rural Electric Cooperative, Inc. and 
Morrow Electric Cooperative, Inc.) to become Consolidated Electric 
Cooperative, Inc.
    Comment date: July 17, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

26. Ohio Edison Company, Pennsylvania Power Company

[Docket No. ER97-3375-000]

    Take notice that on June 18, 1997, Ohio Edison Company, tendered 
for filing on behalf of itself and Pennsylvania Power Company, a 
Service Agreement with Southern Energy Trading and Marketing, Inc. 
under Ohio Edison's Power Sales Tariff. This filing is made pursuant to 
Sec. 205 of the Federal Power Act.
    Comment date: July 17, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

27. Central Illinois Public Service Company

[Docket No. ER97-3376-000]

    Take notice that on June 18, 1997, Central Illinois Public Service 
Company (CIPS), submitted an umbrella short-term firm transmission 
service agreement, dated April 9, 1997, establishing CIPS Generation 
Resources as a customer under the terms of CIPS' Open Access 
Transmission Tariff.
    CIPS requests an effective date of May 19, 1997 for the service 
agreement. Accordingly, CIPS requests waiver of the Commission's notice 
requirements. Copies of this filing were served upon the Illinois 
Commerce Commission.
    Comment date:  July 17, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

28. Allegheny Power Service Corporation, on behalf of Monongahela Power 
Company, The Potomac Edison Company and West Penn Power Company 
(Allegheny Power)

[Docket No. ER97-3377-000]

    Take notice that on June 18, 1997, Allegheny Power Service 
Corporation on behalf of Monongahela Power Company, The Potomac Edison 
Company and West Penn Power Company (Allegheny Power) filed Supplement 
No. 25 to add one (1) new Customer to the Standard Generation Service 
Rate Schedule under which Allegheny Power offers standard generation 
and emergency service on an hourly, daily, weekly, monthly or yearly 
basis. Allegheny Power requests a waiver of notice requirements to make 
service available as of June 17, 1997, to Southern Energy Trading and 
Marketing, Inc.
    Copies of the filing have been provided to the Public Utilities 
Commission of Ohio, the Pennsylvania Public Utility Commission, the 
Maryland Public Service Commission, the Virginia State Corporation 
Commission, the West Virginia Public Service Commission, and all 
parties of record.
    Comment date: July 17, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

29. Kentucky Utilities Company

[Docket No. ER97-3378-000]

    Take notice that on June 18, 1997, Kentucky Utilities Company (KU), 
tendered for filing five (5) Supplements to FERC Rate Schedule 203, the 
Interconnection Agreement between KU and East Kentucky Power 
Cooperative.
    Comment date: July 17, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

30. Carolina Power & Light Company

[Docket No. ER97-3379-000]

    Take notice that on June 19, 1997, Carolina Power & Light Company 
(CP&L), tendered for filing Service Agreements for Non-Firm Point-to-
Point Transmission Service executed between CP&L and the following 
Eligible Transmission Customers: NorAm Energy Services, Inc.; and NP 
Energy, Inc. Service to each Eligible Customer will be in accordance 
with the terms and conditions of Carolina Power & Light Company's Open 
Access Transmission Tariff.
    Copies of the filing were served upon the North Carolina Utilities 
Commission and the South Carolina Public Service Commission.
    Comment date: July 17, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

31. Carolina Power & Light Company

[Docket No. ER97-3380-000]

    Take notice that on June 19, 1997, Carolina Power & Light Company 
(Carolina), tendered for filing executed Service Agreements between 
Carolina and the following Eligible Entities: NP Energy Inc.; and 
Consumers Power Company and the Detroit Edison Company referred to 
collectively as the Michigan Companies. Service to each Eligible Entity 
will be in accordance with the terms and conditions of Carolina's 
Tariff No. 1 for Sales of Capacity and Energy.
    Copies of the filing were served upon the North Carolina Utilities 
Commission and the South Carolina Public Service Commission.

[[Page 37227]]

    Comment date: July 17, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

32. New England Power Company

[Docket No. ER97-3381-000]

    Take notice that on June 19, 1997, New England Power Company (NEP) 
filed a Service Agreement with Edison Source for non-firm, point-to-
point transmission service under NEP's open access transmission tariff, 
FERC Electric Tariff, Original Volume No. 9.
    Comment date: July 17, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

33. New England Power Company

[Docket No. ER97-3382-000]

    Take notice that on June 19, 1997, New England Power Company (NEP) 
filed a supplement to its Network Integration Service Agreement with 
Holden (Mass.) Municipal Light Department under NEP's open access 
transmission tariff, FERC Electric Tariff, Original Volume No. 9.
    Comment date: July 17, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

34. Kansas City Power & Light Company

[Docket No. ER97-3383-000]

    Take notice that on June 19, 1997, Kansas City Power & Light 
Company (KCPL), tendered for filing a Service Agreement dated May 19, 
1997, between KCPL and PECO Energy Company--Power Team. KCPL proposes 
an effective date of June 4, 1997, and requests waiver of the 
Commission's notice requirement. This Agreement provides for the rates 
and charges for Non-Firm Transmission Service.
    In its filing, KCPL states that the rates included in the above-
mentioned Service Agreement are KCPL's rates and charges in the 
compliance filing to FERC Order 888 in Docket No. OA96-4-000.
    Comment date: July 17, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

35. Kansas City Power & Light Company

[Docket No. ER97-3384-000]

    Take notice that on June 19, 1997, Kansas City Power & Light 
Company (KCPL), tendered for filing a Service Agreement dated May 14, 
1997, between KCPL and Williams Energy Services Company. KCPL proposes 
an effective date of June 2, 1997, and requests waiver of the 
Commission's notice requirement. This Agreement provides for the rates 
and charges for Non-Firm Transmission Service.
    In its filing, KCPL states that the rates included in the above-
mentioned Service Agreement are KCPL's rates and charges in the 
compliance filing to FERC Order 888 in Docket No. OA96-4-000.
    Comment date: July 17, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

36. Additional Signatories to PJM Interconnection, L.L.C. Operating 
Agreement

[Docket No. ER97-3385-000]

    Take notice that on June 17, 1997, the PJM Interconnection, L.L.C. 
(PJM) filed, on behalf of the Members of the LLC, membership 
applications of Camden Cogen, L.P. and Williams Energy Services 
Company. PJM requests an effective date of June 18, 1997.
    Comment date: July 17, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

37. Central Maine Power Company

[Docket No. ER97-3390-000]

    Take notice that on June 20, 1997, Central Maine Power Company 
(Central Maine) tendered for filing with the Federal Energy Regulatory 
Commission its Wholesale Market Tariff, FERC Electric Tariff. Under the 
tariff, Central Maine may enter into service agreements for the sale at 
wholesale of electric capacity and/or energy at negotiated rates and 
may conduct transactions pursuant to such service agreements.
    Central Maine requests an effective of August 9, 1997, or the date 
of approval by the Commission, whichever comes earlier.
    Central Maine has served copies of the filing upon the Maine Public 
Utilities Commission and the Maine Office of the Public Advocate.
    Comment date: July 17, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

38. Paul M. Anderson

[Docket No. ID-3055-000]

    Take notice that on June 18, 1997, Paul M. Anderson filed an 
application for authorization under Section 305(b) of the Federal Power 
Act to hold the following positions:

Director: Duke Energy Corporation
Director: Temple-Inland, Inc.

39. Orlando Utilities Commission

[Docket No. NJ97-13-000]

    Take notice that on June 26, 1997, Orlando Utilities Commission 
tendered for filing for an order declaring that voluntary tariff meets 
requirements of Order No. 888.
    Comment date: August 1, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

40. Lordsburg Limited Partnership

[Docket No. EG97-72-000]

    On June 26, 1997, Lordsburg Limited Partnership, 820 Gessner, Suite 
930, Houston, Texas, 77024-4258 (Lordsburg) filed with the Federal 
Energy Regulatory Commission an application for determination of exempt 
wholesale generator status pursuant to Part 365 of the Commission's 
Regulations.
    Lordsburg owns a natural gas-fired eligible facility under 
development with a capacity of approximately 110 megawatts (along with 
certain appurtenant interconnected transmission facilities), to be 
located near Lordsburg, New Mexico. Construction of the facility has 
not yet commenced.
    Comment date: July 23, 1997, in accordance with Standard Paragraph 
E at the end of this notice. The Commission will limit its 
consideration of comments to those that concern the adequacy or 
accuracy of the application.

Standard Paragraph

    E. Any person desiring to be heard or to protest said filing should 
file a motion to intervene or protest with the Federal Energy 
Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426, 
in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
motions or protests should be filed on or before the comment date. 
Protests will be considered by the Commission in determining the 
appropriate action to be taken, but will not serve to make protestants 
parties to the proceeding. Any person wishing to become a party must 
file a motion to intervene. Copies of this filing are on file with the 
Commission and are available for public inspection.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 97-18189 Filed 7-10-97; 8:45 am]
BILLING CODE 6717-01-P