DEPARTMENT OF ENERGY
[Docket No. EG97-43-000, et al.]


ESI Doswell Power Services, Inc., et al.; Electric Rate and 
Corporate Regulation Filings

    March 25, 1997.
    Take notice that the following filings have been made with the 
Commission:

1. ESI Doswell Power Services, Inc.

[Docket No. EG97-43-000]

    On March 13, 1997, ESI Doswell Power Services, Inc. (Applicant), 
with its principal office at 11760 U.S. Highway One, Suite 600, North 
Palm Beach, Florida 33408, filed with the Federal Energy Regulatory 
Commission (the Commission) an application for determination of exempt 
wholesale generator status pursuant to Part 365 of the Commission's 
Regulations. Applicant states that it will operate the 665 MW gas-fired 
Doswell combined cycle power plant located in Hanover County, Virginia.
    Comment date: April 11, 1997, in accordance with Standard Paragraph 
E at the end of this notice. The Commission will limit its 
consideration of comments to those that concern the adequacy or 
accuracy of the application.

2. TermoEmcali I. S.C.A. E.S.P.

[Docket No. EG97-44-000]

    On March 18, 1997, TermoEmcali I S.C.A. E.S.P. (TermoEmcali), with 
its address   c/o International Generating Company, Inc., One Bowdoin 
Square, Boston, MA 02114, filed with the Federal Energy Regulatory 
Commission (FERC or the Commission) an application for determination of 
exempt wholesale generator status pursuant to Part 365 of the 
Commission's Regulations.
    TermoEmcali is a Colombian company that will be engaged directly 
and exclusively in the business of owning or operating, or both owning 
and operating, all or part of one or more eligible facilities to be 
located in Colombia. The eligible facilities will consist of an 
approximately 233 MW gas fired electric generation plant and related 
interconnection facilities. The output of the eligible facilities will 
be sold at wholesale.
    Comment date: April 9, 1997, in accordance with Standard Paragraph 
E at the end of this notice. The Commission will limit its 
consideration of comments to those that concern the adequacy or 
accuracy of the application.

3. JMC Cauca Valley, Inc.

[Docket No. EG97-45-000]

    On March 18, 1997, JMC Cauca Valley, Inc. (JMCV), with its address 
c/o International Generating Company, Inc., One Bowdoin Square, Boston, 
MA 02114, filed with the Federal Energy Regulatory Commission (FERC or 
the Commission) an application for determination of exempt wholesale 
generator status pursuant to Part 365 of the Commission's Regulations.

[[Page 15680]]

    JMCV is a Cayman Islands company that will be engaged directly and 
indirectly and exclusively in the business of owning or operating, or 
both owning and operating, all or part of one or more eligible 
facilities to be located in Colombia. The eligible facilities will 
consist of an approximately 233 MW gas fired electric generation plant 
and related interconnection facilities. The output of the eligible 
facilities will be sold at wholesale.
    Comment date: April 9, 1997, in accordance with Standard Paragraph 
E at the end of this notice. The Commission will limit its 
consideration of comments to those that concern the adequacy or 
accuracy of the application.

4. Power Authority of the State of New York

[Docket No. EL97-29-000]

    Take notice that on March 7, 1997, the Power Authority of the State 
of New York (NYPA) tendered for filing a Complaint, Motion for Summary 
Disposition and a Motion to Shorten the Time for Response by Niagara 
Mohawk Power Corporation to Complaint against Niagara Mohawk Power 
Corporation (Niagara Mohawk). In its filings, NYPA requests that 
Niagara Mohawk be required to provide transmission service to NYPA's 
high load factor manufacturing customers pursuant to FERC Rate Schedule 
No. 95, and further that Niagara Mohawk not be permitted to engage in 
anti-competitive practices against NYPA.
    NYPA states that a copy of this filing has been mailed to Niagara 
Mohawk.
    Comment date: April 15, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

5. Commonwealth Edison Company

[Docket No. ER97-2046-000]

    Take notice that on March 11, 1997, Commonwealth Edison Company 
(ComEd), submitted for filing Service Agreements, establishing Michigan 
Public Power Agency (MPPA), American Energy Solutions, Inc. (AESI), and 
Upper Peninsula Power (UPP), as customers under the terms of ComEd's 
Power Sales and Reassignment of Transmission Rights Tariff PSRT-1 
(PSRT-1 Tariff). The Commission has previously designated the PSRT-1 
Tariff as FERC Electric Tariff, First Revised Volume No. 2.
    ComEd requests an effective date of February 9, 1997, and 
accordingly seeks waiver of the Commission's requirements. Copies of 
this filing were served upon MPPA, AESI, UPP, and the Illinois Commerce 
Commission.
    Comment date: April 8, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

6. Commonwealth Edison Company

[Docket No. ER97-2047-000]

    Take notice that on March 11, 1997, Commonwealth Edison Company 
(ComEd), submitted for filing Service Agreements for various firm 
transactions establishing with Wisconsin Electric Power Company 
(WEPCO), and Commonwealth Edison Company, in its wholesale merchant 
function (ComEd WMD), and a Non-Firm Service Agreement with American 
Energy Solutions, Inc. (AESI), as transmission customers under the 
terms of ComEd's Open Access Transmission Tariff (OATT).
    ComEd requests various effective dates, corresponding to the date 
each service agreement was entered into, and accordingly seeks waiver 
of the Commission's Requirements. Copies of this filing were served 
upon WEPCO, ComEd WMD, AESI, and the Illinois Commerce Commission.
    Comment date: April 8, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

7. Central Hudson Gas and Electric Corporation

[Docket No. ER97-2048-000]

    Take notice that on March 12, 1997, Central Hudson Gas and Electric 
Corporation (CHG&E), tendered for filing pursuant to Section 35.12 of 
the Federal Energy Regulatory Commission's (Commission) Regulations in 
18 CFR a Service Agreement between CHG&E and NorAm Energy Services, 
Inc. The terms and conditions of service under this Agreement are made 
pursuant to CHG&E's FERC Electric Rate Schedule, Original Volume No. 1 
(Power Sales Tariff) accepted by the Commission in Docket No. ER97-890-
000. CHG&E also has requested waiver of the 60-day notice provision 
pursuant to 18 CFR Section 35.11.
    A copy of this filing has been served on the Public Service 
Commission of the State of New York.
    Comment date: April 8, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

8. Central Hudson Gas and Electric Corporation

[Docket No. ER97-2049-000]

    Take notice that on March 12, 1997, Central Hudson Gas and Electric 
Corporation (CHG&E), tendered for filing pursuant to Section 35.12 of 
the Federal Energy Regulatory Commission's (Commission) Regulations in 
18 CFR a Service Agreement between CHG&E and The Power Company of 
America, L.P. The terms and conditions of service under this Agreement 
are made pursuant to CHG&E's FERC Electric Rate Schedule, Original 
Volume No. 1 (Power Sales Tariff) accepted by the Commission in Docket 
No. ER97-890-000. CHG&E also has requested waiver of the 60-day notice 
provision pursuant to 18 CFR 35.11.
    A copy of this filing has been served on the Public Service 
Commission of the State of New York.
    Comment date: April 8, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

9. Central Hudson Gas and Electric Corporation

[Docket No. ER97-2050-000]

    Take notice that on March 12, 1997, Central Hudson Gas and Electric 
Corporation (CHG&E), tendered for filing pursuant to Section 35.12 of 
the Federal Energy Regulatory Commission's (Commission) Regulations in 
18 CFR a Service Agreement between CHG&E and PanEnergy Trading and 
Marketing Services, L.L.C. The terms and conditions of service under 
this Agreement are made pursuant to CHG&E's FERC Electric Rate 
Schedule, Original Volume No. 1 (Power Sales Tariff) accepted by the 
Commission in Docket No. ER97-890-000. CHG&E also has requested waiver 
of the 60-day notice provision pursuant to 18 CFR 35.11.
    A copy of this filing has been served on the Public Service 
Commission of the State of New York.
    Comment date: April 8, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

10. Central Hudson Gas and Electric Corporation

[Docket No. ER97-2051-000]

    Take notice that on March 12, 1997, Central Hudson Gas and Electric 
Corporation (CHG&E), tendered for filing pursuant to Section 35.12 of 
the Federal Energy Regulatory Commission's (Commission) Regulations in 
18 CFR a Service Agreement between CHG&E and TransCanada Energy Ltd. 
The terms and conditions of service under this Agreement are made 
pursuant to CHG&E's FERC Electric Rate Schedule, Original Volume No. 1 
(Power Sales Tariff) accepted by the Commission in Docket No. ER97-890-
000. CHG&E also has requested waiver of the 60-day

[[Page 15681]]

notice provision pursuant to 18 CFR 35.11.
    A copy of this filing has been served on the Public Service 
Commission of the State of New York.
    Comment date: April 8, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

11. Central Hudson Gas and Electric Corporation

[Docket No. ER97-2052-000]

    Take notice that on March 12, 1997, Central Hudson Gas and Electric 
Corporation (CHG&E), tendered for filing pursuant to Section 35.12 of 
the Federal Energy Regulatory Commission's (Commission) Regulations in 
18 CFR a Service Agreement between CHG&E and Federal Energy Sales, Inc. 
The terms and conditions of service under this Agreement are made 
pursuant to CHG&E's FERC Electric Rate Schedule, Original Volume No. 1 
(Power Sales Tariff) accepted by the Commission in Docket No. ER97-890-
000. CHG&E also has requested waiver of the 60-day notice provision 
pursuant to 18 CFR 35.11.
    A copy of this filing has been served on the Public Service 
Commission of the State of New York.
    Comment date: April 8, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

12. Central Hudson Gas and Electric Corporation

[Docket No. ER97-2053-000]

    Take notice that on March 12, 1997, Central Hudson Gas and Electric 
Corporation (CHG&E), tendered for filing pursuant to Section 35.12 of 
the Federal Energy Regulatory Commission's (Commission) Regulations in 
18 CFR a Service Agreement between CHG&E and Plum Street Energy 
Marketing, Inc. The terms and conditions of service under this 
Agreement are made pursuant to CHG&E's FERC Electric Rate Schedule, 
Original Volume No. 1 (Power Sales Tariff) accepted by the Commission 
in Docket No. ER97-890-000. CHG&E also has requested waiver of the 60-
day notice provision pursuant to 18 CFR 35.11.
    A copy of this filing has been served on the Public Service 
Commission of the State of New York.
    Comment date: April 8, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

13. Central Hudson Gas and Electric Corporation

[Docket No. ER97-2054-000]

    Take notice that on March 12, 1997, Central Hudson Gas and Electric 
Corporation (CHG&E), tendered for filing pursuant to Section 35.12 of 
the Federal Energy Regulatory Commission's (Commission) Regulations in 
18 CFR a Service Agreement between CHG&E and Long Island Lighting 
Company. The terms and conditions of service under this Agreement are 
made pursuant to CHG&E's FERC Electric Rate Schedule, Original Volume 
No. 1 (Power Sales Tariff) accepted by the Commission in Docket No. 
ER97-890-000. CHG&E also has requested waiver of the 60-day notice 
provision pursuant to 18 CFR 35.11.
    A copy of this filing has been served on the Public Service 
Commission of the State of New York.
    Comment date: April 8, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

14. Central Hudson Gas and Electric Corporation

[Docket No. ER97-2055-000]

    Take notice that on March 12, 1997, Central Hudson Gas and Electric 
Corporation (CHG&E), tendered for filing pursuant to Section 35.12 of 
the Federal Energy Regulatory Commission's (Commission) Regulations in 
18 CFR a Service Agreement between CHG&E and CNG Power Services 
Corporation. The terms and conditions of service under this Agreement 
are made pursuant to CHG&E's FERC Electric Rate Schedule, Original 
Volume No. 1 (Power Sales Tariff) accepted by the Commission in Docket 
No. ER97-890-000. CHG&E also has requested waiver of the 60-day notice 
provision pursuant to 18 CFR 35.11.
    A copy of this filing has been served on the Public Service 
Commission of the State of New York.
    Comment date: April 8, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

15. Central Hudson Gas and Electric Corporation

[Docket No. ER97-2056-000]

    Take notice that on March 12, 1997, Central Hudson Gas and Electric 
Corporation (CHG&E), tendered for filing pursuant to Section 35.12 of 
the Federal Energy Regulatory Commission's (Commission) Regulations in 
18 CFR a Service Agreement between CHG&E and Engelhard Power Marketing, 
Inc. The terms and conditions of service under this Agreement are made 
pursuant to CHG&E's FERC Electric Rate Schedule, Original Volume No. 1 
(Power Sales Tariff) accepted by the Commission in Docket No. ER97-890-
000. CHG&E also has requested waiver of the 60-day notice provision 
pursuant to 18 CFR 35.11.
    A copy of this filing has been served on the Public Service 
Commission of the State of New York.
    Comment date: April 8, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

16. Central Hudson Gas and Electric Corporation

[Docket No. ER97-2057-000]

    Take notice that on March 12, 1997, Central Hudson Gas and Electric 
Corporation (CHG&E), tendered for filing pursuant to Section 35.12 of 
the Federal Energy Regulatory Commission's (Commission) Regulations in 
18 CFR a Service Agreement between CHG&E and Coastal Electric Services 
Company. The terms and conditions of service under this Agreement are 
made pursuant to CHG&E's FERC Electric Rate Schedule, Original Volume 
No. 1 (Power Sales Tariff) accepted by the Commission in Docket No. 
ER97-890-000. CHG&E also has requested waiver of the 60-day notice 
provision pursuant to 18 CFR 35.11.
    A copy of this filing has been served on the Public Service 
Commission of the State of New York.
    Comment date: April 8, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

17. Central Hudson Gas and Electric Corporation

[Docket No. ER97-2058-000]

    Take notice that on March 12, 1997, Central Hudson Gas and Electric 
Corporation (CHG&E), tendered for filing pursuant to Section 35.12 of 
the Federal Energy Regulatory Commission's (Commission) Regulations in 
18 CFR a Service Agreement between CHG&E and Coastal Electric Services 
Company. The terms and conditions of service under this Agreement are 
made pursuant to CHG&E's FERC Electric Rate Schedule, Original Volume 
No. 1 (Power Sales Tariff) accepted by the Commission in Docket No. 
ER97-890-000. CHG&E also has requested waiver of the 60-day notice 
provision pursuant to 18 CFR 35.11.
    A copy of this filing has been served on the Public Service 
Commission of the State of New York.

[[Page 15682]]

    Comment date: April 8, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

18. Central Hudson Gas and Electric Corporation

[Docket No. ER97-2059-000]

    Take notice that on March 12, 1997, Central Hudson Gas and Electric 
Corporation (CHG&E), tendered for filing pursuant to Section 35.12 of 
the Federal Energy Regulatory Commission's (Commission) Regulations in 
18 CFR a Service Agreement between CHG&E and LG&E Power Marketing, Inc. 
The terms and conditions of service under this Agreement are made 
pursuant to CHG&E's FERC Electric Rate Schedule, Original Volume No. 1 
(Power Sales Tariff) accepted by the Commission in Docket No. ER97-890-
000. CHG&E also has requested waiver of the 60-day notice provision 
pursuant to 18 CFR 35.11.
    A copy of this filing has been served on the Public Service 
Commission of the State of New York.
    Comment date: April 8, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

19. Central Hudson Gas and Electric Corporation

[Docket No. ER97-2060-000]

    Take notice that on March 12, 1997, Central Hudson Gas and Electric 
Corporation (CHG&E), tendered for filing pursuant to Section 35.12 of 
the Federal Energy Regulatory Commission's (Commission) Regulations in 
18 CFR a Service Agreement between CHG&E and Duke/Louis Dreyfus L.L.C. 
The terms and conditions of service under this Agreement are made 
pursuant to CHG&E's FERC Electric Rate Schedule, Original Volume No. 1 
(Power Sales Tariff) accepted by the Commission in Docket No. ER97-890-
000. CHG&E also has requested waiver of the 60-day notice provision 
pursuant to 18 CFR 35.11.
    A copy of this filing has been served on the Public Service 
Commission of the State of New York.
    Comment date: April 8, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

20. The Detroit Edison Company

[Docket No. ER97-2061-000]

    Take notice that on March 12, 1997, The Detroit Edison Company 
(Detroit Edison), tendered for filing Service Agreements for Network 
Integration Transmission Service and Non-Firm Point-to-Point 
Transmission Service (the Service Agreements) between Detroit Edison 
Transmission Operations and Detroit Edison Merchant Operations under 
the Joint Open Access Transmission Tariff of Consumers Energy Company 
and Detroit Edison. Each of the Service Agreements are dated as of 
February 28, 1997. Detroit Edison requests that the Service Agreement 
be made effective as of March 1, 1997.
    Comment date: April 8, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

21. Cleveland Electric Illuminating Company and The Toledo Edison 
Company

[Docket No. ER97-2062-000]

    Take notice that on March 12, 1997, the Centerior Service Company 
as Agent for The Cleveland Electric Illuminating Company and The Toledo 
Edison Company filed Service Agreements to provide Non-Firm Point-to-
Point Transmission Service for Ohio Edison, the Transmission Customer. 
Services are being provided under the Centerior Open Access 
Transmission Tariff submitted for filing by the Federal Energy 
Regulatory Commission in Docket No. OA96-204-000. The proposed 
effective date under the Service Agreement is January 28, 1997.
    Comment date: April 8, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

22. Cinergy Services, Inc.

[Docket No. ER97-2063-000]

    Take notice that on March 12, 1997, Cinergy Services, Inc. 
(Cinergy), tendered for filing a service agreement under Cinergy's Open 
Access Transmission Tariff (the Tariff) entered into between Cinergy 
and WPS Energy, Inc. (WPS) and an index of customers. Cinergy will 
provide non-firm transmission service pursuant to the rates, terms and 
conditions of its Tariff. Cinergy is requesting an effective date of 
March 1, 1997.
    Comment date: April 8, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

23. Cinergy Services, Inc.

[Docket No. ER97-2064-000]

    Take notice that on March 12, 1997, Cinergy Services, Inc. 
(Cinergy), tendered for filing a service agreement and confirmation 
letter under Cinergy's Non-Firm Power Sales Standard Tariff (the 
Tariff) entered into between Cinergy and Illinois Power Company.
    Cinergy and Illinois Power Company are requesting an effective date 
of February 15, 1997.
    Comment date: April 8, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

24. Cinergy Services, Inc.

[Docket No. ER97-2065-000]

    Take notice that on March 12, 1997, Cinergy Services, Inc. 
(Cinergy), tendered for filing on behalf of its operating companies, 
The Cincinnati Gas & Electric Company (CG&E) and PSI Energy, Inc. 
(PSI), an Interchange Agreement, dated March 1, 1997 between Cinergy, 
CG&E, PSI and EnerZ Corporation (EnerZ).
    The Interchange Agreement provides for the following service 
between Cinergy and EnerZ.
    1. Exhibit A--Power Sales by EnerZ.
    2. Exhibit B--Power Sales by Cinergy.
    Cinergy and EnerZ have requested an effective date of one day after 
this initial filing of the Interchange Agreement.
    Copies of the filing were served on EnerZ Corporation, the New York 
Public Service Commission, the Kentucky Public Service Commission, the 
Public Utilities Commission of Ohio and the Indiana Utility Regulatory 
Commission.
    Comment date: April 8, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

25. Cinergy Services, Inc.

[Docket No. ER97-2066-000]

    Take notice that on March 12, 1997, Cinergy Services, Inc. 
(Cinergy), tendered for filing a service agreement and confirmation 
letter under Cinergy's Non-firm Power Sales Standard Tariff (the 
Tariff) entered into between Cinergy and South Carolina Electric & Gas 
Company.
    Cinergy and South Carolina Electric & Gas Company are requesting an 
effective date of February 15, 1997.
    Comment date: April 8, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

26. Southern Company Services, Inc.

[Docket No. ER97-2068-000]

    Take notice that on March 12, 1997, Southern Company Services, Inc. 
(SCS), acting on behalf of Alabama Power Company, Georgia Power 
Company, Gulf Power Company, Mississippi Power Company, and Savannah 
Electric and Power Company (collectively referred to as Southern 
Companies) filed two (2) agreements between SCS, as agent for Southern 
Companies, and Entergy Power, Inc. relating to the provision of firm 
point-to-point transmission service under Part II of the Open Access 
Transmission Tariff of Southern Companies.

[[Page 15683]]

    Comment date: April 8, 1997, in accordance with Standard Paragraph 
E at the end of this notice.

Standard Paragraph

    E. Any person desiring to be heard or to protest said filing should 
file a motion to intervene or protest with the Federal Energy 
Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426, 
in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
motions or protests should be filed on or before the comment date. 
Protests will be considered by the Commission in determining the 
appropriate action to be taken, but will not serve to make protestants 
parties to the proceeding. Any person wishing to become a party must 
file a motion to intervene. Copies of this filing are on file with the 
Commission and are available for public inspection.
Lois D. Cashell,
Secretary.