Washington Public Power Supply System; Notice of Withdrawal of 
Application for Amendment to Facility Operating License
    The U.S. Nuclear Regulatory Commission (the Commission) has granted 
the request of Washington Public Power Supply System (the licensee) to 
withdraw its June 6, 1995, as supplemented by letter dated April 22, 
1996, application for proposed amendment to Facility Operating License 
No. NPF-21 for the Washington Nuclear Project No. 2, located in Benton 
County, Washington.
    The proposed change would have modified the facility Technical 
Specifications (TS) pertaining to organizational position titles, Plant 
Operations Committee composition and chairmanship, and a minor 
editorial correction. In addition, TS 6.2.1.e would have been deleted 
and 6.2.1.d modified to incorporate the quality assurance function per 
Generic Letter 88-06 dated March 22, 1988.
    The Commission had previously issued Notices of Consideration of 
Issuance of Amendment published in the Federal Register on July 19, 
1995 (60 FR 37102) and June 28, 1996 (61 FR 33779). However, by letter 
dated January 29, 1997, the licensee withdrew the proposed change.
    For further details with respect to this action, see the 
application for amendment dated June 6, 1995, as supplemented by letter 
dated April 22, 1996, and the licensee's letter dated January 29, 1997, 
which withdrew the application for license amendment. The above 
documents are available for public inspection at the Commission's 
Public Document Room, the Gelman Building, 2120 L Street, NW., 
Washington, DC, and at the local public document room located at the 
Richland Public Library, 955 Northgate Street, Richland, Washington 
99352.

    Dated at Rockville, Maryland, this 13th day of February 1997.

    For the Nuclear Regulatory Commission.
Timothy G. Colburn,
Senior Project Manager, Project Directorate IV-2, Division of Reactor 
Projects--III/IV Office of Nuclear Reactor Regulation.
[FR Doc. 97-4307 Filed 2-20-97; 8:45 am]