[Federal Register Volume 62, Number 33 (Wednesday, February 19, 1997)] [Notices] [Page 7445] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 97-3974] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP97-239-000] ANR Pipeline Company; Notice of Request Under Blanket Authorization February 12, 1997. Take notice that on February 10, 1997, ANR Pipeline Company (ANR), 500 Renaissance Center, Detroit, Michigan 48243, filed a request with the Commission in Docket No. CP97-239-000, pursuant to Sections 157.205, and 157.211 of the Commission's Regulations under the Natural Gas Act (NGA) for authorization to operate under the provisions of Section 7(c) of the NGA an existing interconnection in Harper County, Oklahoma, that has been constructed pursuant to Section 311 of the Natural Gas Policy Act of 1978 (NGPA) authorized in blanket certificate issued in Docket Nos. CP82-480-000 and CP88-532-000, all as more fully set forth in the request on file with the Commission and open to public inspection. ANR seeks authorization to operate a previously constructed interconnection (KansOk Interconnection) with the pipeline system of Kansok Partnership (KansOk), constructed in October, 1994. The facilities consist of a hot tap and tie-in assembly located on ANR's existing 20-inch pipeline. The facilities were originally constructed at a cost of approximately $29,000, for which ANR was fully reimbursed by KansOk. ANR delivers natural gas at this interconnection ``on behalf of'' KansOk for the account of MarGasCo Partnership. The KansOk Interconnection was reported in ANR's 1994 Annual Report of NGPA Section 311 construction in Docket No. CP95-370-000. Any person or the Commission's staff may, within 45 days after the Commission has issued this notice, file pursuant to Rule 214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and pursuant to Sec. 157.205 of the Regulations under the NGA (18 CFR 157.205) a protest to the request. If no protest is filed within the allowed time, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to Section 7 of the NGA. Lois D. Cashell, Secretary. [FR Doc. 97-3974 Filed 2-18-97; 8:45 am] BILLING CODE 6717-01-M