DEPARTMENT OF ENERGY
[Docket No. CP97-159-000]
Transwestern Pipeline Company; Notice of Application
January 13, 1997.
Take notice that on December 18, 1996, Transwestern Pipeline
Company (Transwestern), 1400 Smith Street, P.O. Box 1188, Houston,
Texas, 77251-1188, pursuant to Section 7(c) of the Natural Gas Act
(NGA), filed an application with the Commission in Docket No. CP97-159-
000 for a certificate of public convenience and necessity to operate
two compressor units at their design horsepower level, in order to
increase operational efficiency and capacity on that portion of
Transwestern's system described as its ``Panhandle Lateral'', all as
more fully set forth in the application which is on file with the
Commission and open to the public for inspection.
Specifically, Transwestern proposes to increase the horsepower of
each of the compressor units at its P1 and P2 Compressor Stations in
Roosevelt County, New Mexico and Deaf Smith County, Texas,
respectively, to a design capacity level of 4,700 horsepower (HP). Each
compressor station currently has one Solar turbine operating at a 3,500
ISO HP equivalent, the current certificated capacity level. The
increase in horsepower will be achieved by straightening the inlet
guide vanes at the P1 and P2 compressor stations. Transwestern
estimates the cost of straightening the inlet guide vanes is
approximately $22,600 which would be financed with internally generated
funds.
Any person desiring to be heard or to make any protest with
reference to said application should, on or before February 3, 1997,
file with the Federal Energy Regulatory Commission, 888 First Street,
N.E., Washington, D.C., 20426, a motion to intervene or a protest in
accordance with the requirements of the Commission's Rules of Practice
and Procedure (18 CFR 385.211 and 385.214) and the Regulations under
the Natural Gas Act (18 CFR 157.10). All protests filed with the
Commission will be considered by it in determining the appropriate
action to be taken but will not serve to make the protestants parties
to the proceeding. Any person wishing to become a party to a proceeding
or to participate as a party in any hearing therein must file a motion
to intervene in accordance with the Commission's Rules.
Take further notice that, pursuant to the authority contained in
and subject to the jurisdiction conferred upon the Federal Energy
Regulatory Commission by Sections 7 and 15 of the Natural Gas Act and
the Commission's Rules of Practice and Procedure, a hearing will be
held without further notice before the Commission or its designee on
this application if no motion to intervene is filed within the time
required herein, if the Commission on its own review of the matter
finds that the request should be granted. If a motion for leave to
intervene is timely filed, or if the Commission on its own motion
believes that a formal hearing is required, further notice of such
hearing will be duly given.
Under the procedure herein provided for, unless otherwise advised,
it will be
[[Page 2662]]
unnecessary for Transwestern to appear or be represented at the
hearing.
Lois D. Cashell,
Secretary.
[FR Doc. 97-1166 Filed 1-16-97; 8:45 am]