    Take notice that on December 31, 1996, Williston Basin Interstate 
Pipeline Company (Williston Basin), tendered for filing as part of its 
FERC Gas Tariff, Second Revised Volume No. 1, the following original 
and revised tariff sheets to become effective February 1, 1997:

Second Revised Volume No. 1

First Revised Sheet No. 322A
Original Sheet No. 322B
First Revised Sheet No. 323
Original Sheet No. 323A
First Revised Sheet No. 324
Original Sheet No. 324A
First Revised Sheet No. 325
Original Sheet No. 325A
First Revised Sheet No. 326
Original Sheet No. 326A
First Revised Sheet No. 327
Original Sheet No. 327A
First Revised Sheet No. 328
Original Sheet No. 328A
Original Sheet No. 328B
First Revised Sheet No. 329
Original Sheet No. 329A
Original Sheet No. 329B
First Revised Sheet No. 330
First Revised Sheet No. 331
First Revised Sheet No. 333
First Revised Sheet No. 334
Original Sheet No. 334A
First Revised Sheet No. 335
Original Sheet No. 335A
Original Sheet No. 335B
Third Revised Sheet No. 336
Original Sheet No. 336A
First Revised Sheet No. 337
Original Sheet No. 337A
First Revised Sheet No. 338
Original Sheet No. 338A
First Revised Sheet No. 339
Original Sheet No. 339A
Original Sheet No. 339B
Third Revised Sheet No. 340
Original Sheet No. 340A
First Revised Sheet No. 341
Original Sheet No. 341A
Original Sheet No. 341B

    Williston Basin states that these tariff sheets reflect the 
Company's proposal to incorporate the recovery of electric power 
purchased for use in the operation of its electric compressor stations 
into the current fuel reimbursement adjustment provision. By doing so, 
Williston Basin's electric power costs will be tracked in a manner very 
similar to the Company's current method for tracking gas fuel 
requirements as outlined in Section 38 of its FERC Gas Tariff, Second 
Revised Volume No. 1. Williston Basin further states that although such 
electric costs will be tracked independently of the gas costs, for 
billing purposes the gas and electric compressor rates or in-kind 
percentages will be added together in order to reflect only one 
applicable fuel rate or percentage rate for each rate schedule.
    Any person desiring to be heard or to protest said filing should 
file a motion to intervene or protest with the Federal Energy 
Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426, 
in accordance with Sections 385.214 and 385.211 of the Commission's 
Rules and Regulations. All such motions or protests must be filed in 
accordance with Section 154.210 of the Commission's Regulations. 
Protests will be considered by the Commission in determining the 
appropriate action to be taken, but will not serve to make protestants 
parties to the proceeding. Any person wishing to become a party must 
file a motion to intervene. Copies of this filing are on file with the 
Commission and are available for public inspection in the Public 
Reference Room.