[Federal Register Volume 61, Number 201 (Wednesday, October 16, 1996)]
[Notices]
[Page 53911]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-26401]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY
[Docket No. CP97-14-000]


Williams Natural Gas Company; Notice of Request Under Blanket 
Authorization

October 9, 1996.
    Take notice that on October 4, 1996, Williams Natural Gas Company 
(WNG), P.O. Box 3288, Tulsa, Oklahoma 74101, filed in Docket No. CP97-
14-000 a request pursuant to Secs. 157.205, 157.212 and 157.216 of the 
Commission's Regulations under the Natural Gas Act (18 CFR 157.205, 
157.212 and 157.216) for authorization to abandon by reclaim the 
Western Resources, Inc. Jewell town border setting and a high pressure 
regulator setting, and to relocate and construct a replacement town 
border setting, all located in Jewell County, Kansas, under WNG's 
blanket certificate issued in Docket No. CP82-479-000 pursuant to 
Section 7 of the Natural Gas Act, all as more fully set forth in the 
request that is on file with the Commission and open to public 
inspection.
    WNG proposes to replace the Jewell town border setting with a skid-
mounted positive displacement meter setting with two self-operated 
pressure regulator cuts. The new facilities will be located across the 
road from the existing site at the high pressure regulator location in 
Jewell County, Kansas. The facilities are being relocated due to space 
limitation and site stability at the present site.
    WNG states that the projected volume of delivery will remain 
unchanged; the most recent annual volume through the Jewell town border 
setting was 109,500 Dth with a peak day volume of 359 Dth. WGN 
estimates the construction cost to be $21,679 and the reclaim cost to 
be $3,285.
    Any person or the Commission's staff may, within 45 days after 
issuance of the instant notice by the Commission, file pursuant to Rule 
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
intervene or notice of intervention and pursuant to Sec. 157.205 of the 
Regulations under the Natural Gas Act (18 CFR 157.205) a protest to the 
request. If no protest is filed within the time allowed therefor, the 
proposed activity shall be deemed to be authorized effective the day 
after the time allowed for filing a protest. If a protest is filed and 
not withdrawn within 30 days after the time allowed for filing a 
protest, the instant request shall be treated as an application for 
authorization pursuant to Section 7 of the Natural Gas Act.
Lois D. Cashell,
Secretary.
[FR Doc. 96-26401 Filed 10-15-96; 8:45 am]
BILLING CODE 6717-01-M