[Federal Register Volume 61, Number 201 (Wednesday, October 16, 1996)] [Notices] [Page 53911] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 96-26401] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY [Docket No. CP97-14-000] Williams Natural Gas Company; Notice of Request Under Blanket Authorization October 9, 1996. Take notice that on October 4, 1996, Williams Natural Gas Company (WNG), P.O. Box 3288, Tulsa, Oklahoma 74101, filed in Docket No. CP97- 14-000 a request pursuant to Secs. 157.205, 157.212 and 157.216 of the Commission's Regulations under the Natural Gas Act (18 CFR 157.205, 157.212 and 157.216) for authorization to abandon by reclaim the Western Resources, Inc. Jewell town border setting and a high pressure regulator setting, and to relocate and construct a replacement town border setting, all located in Jewell County, Kansas, under WNG's blanket certificate issued in Docket No. CP82-479-000 pursuant to Section 7 of the Natural Gas Act, all as more fully set forth in the request that is on file with the Commission and open to public inspection. WNG proposes to replace the Jewell town border setting with a skid- mounted positive displacement meter setting with two self-operated pressure regulator cuts. The new facilities will be located across the road from the existing site at the high pressure regulator location in Jewell County, Kansas. The facilities are being relocated due to space limitation and site stability at the present site. WNG states that the projected volume of delivery will remain unchanged; the most recent annual volume through the Jewell town border setting was 109,500 Dth with a peak day volume of 359 Dth. WGN estimates the construction cost to be $21,679 and the reclaim cost to be $3,285. Any person or the Commission's staff may, within 45 days after issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and pursuant to Sec. 157.205 of the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to the request. If no protest is filed within the time allowed therefor, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to Section 7 of the Natural Gas Act. Lois D. Cashell, Secretary. [FR Doc. 96-26401 Filed 10-15-96; 8:45 am] BILLING CODE 6717-01-M