[Federal Register Volume 61, Number 196 (Tuesday, October 8, 1996)] [Notices] [Pages 52787-52788] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 96-25685] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY [Docket No. EG96-97-000, et al.] Fibrowatt Thetford Limited, et al.; Electric Rate and Corporate Regulation Filings October 1, 1996. Take notice that the following filings have been made with the Commission: 1. Fibrowatt Thetford Limited [Docket No. EG96-97-000] On September 25, 1996, Fibrowatt Thetford Limited (the ``Applicant'') whose address is Astley House, 33 Notting Hill Gate, London, England, W113JQ, filed with the Federal Energy Regulatory Commission an application for determination of exempt wholesale generator status pursuant to Part 365 of the Commission's Regulations. The Applicant states that it will be engaged directly and exclusively in the business of owning an approximately 38.5-MW net poultry-litter-fired electrical generating facility located in Thetford, England, and selling electric energy at wholesale, as that term has been interpreted by the Commission. The Applicant requests a determination that the Applicant is an exempt wholesale generator under Section 32(a)(1) of the Public Utility Holding Company Act of 1935. Comment date: October 22, 1996, in accordance with Standard Paragraph E at the end of this notice. The Commission will limit its consideration of comments to those that concern the adequacy or accuracy of the application. 2. Termovalle S.C.A. Empresa de Servicios Publico [Docket No. EG96-96-000] On September 25, 1996, Termovalle S.C.A. Empresa de Servicios Publico (``Termovalle''), United States office at [[Page 52788]] KMR Power Corporation, Suite 902, 1000 Wilson Blvd, Arlington, VA 22209, filed with the Federal Energy Regulatory Commission an Application For Determination Of Status As An Exempt Wholesale Generator pursuant to Part 365 of the Commission's Regulations. Termovalle will directly or indirectly and exclusively, develop, own and operate an electric generating facility, to be located near Cali, Colombia and sell electricity at wholesale or exclusively in markets outside of the United States. The electric generating facility will be a natural gas fired combined cycle generating unit, consisting principally of a combustion turbine and associated electric generator, a steam turbine and associated electric generator and appurtenant interconnection facilities. The facility will have a nominal generating capacity of 199 MW. Comment date: October 22, 1996, in accordance with Standard Paragraph E at the end of this notice. The Commission will limit its consideration of comments to those that concern the adequacy or accuracy of the application. 3. Catamount Thetford Corporation [Docket No. EG96-98-000] On September 25, 1996, Catamount Thetford Corporation (the ``Applicant'') whose address is 71 Allen Street, Building A, Rutland, Vermont, 05701, filed with the Federal Energy Regulatory Commission an application for determination of exempt wholesale generator status pursuant to Part 365 of the Commission's Regulations. The Applicant states that it will be engaged indirectly, through its subsidiary, Fibrowatt Thetford Limited, and exclusively in the business of owning an approximately 38.5-MW net poultry-litter-fired electrical generating facility located in Thetford, England, and selling electric energy at wholesale, as that term has been interpreted by the Commission. The Applicant requests a determination that the Applicant is an exempt wholesale generator under Section 32(a)(1) of the Public Utility Holding Company Act of 1935. Comment date: October 22, 1996, in accordance with Standard Paragraph E at the end of this notice. The Commission will limit its consideration of comments to those that concern the adequacy or accuracy of the application. 4. Consumers Power Company [Docket No. ES96-48-000] Take notice that on September 27, 1996, Consumers Power Company filed an application, under Sec. 204 of the Federal Power Act, seeking authorization to issue secured and/or unsecured evidences of indebtedness and/or short-term debt, including but not limited to notes, drafts and commercial paper, from time to time, in an aggregate principal amount of up to $900 million outstanding at any one time, during the period January 1, 1997 through December 31, 1998, with a final maturity date not to exceed 364 days from the date of issue. Comment date: October 25, 1996, in accordance with Standard Paragraph E at the end of this notice. 5. Kansas Gas and Electric Company [Docket No. ES96-49-000] Take notice that on September 26, 1996, Kansas Gas and Electric Company filed an application, under Sec. 204 of the Federal Power Act, seeking authorization to issue promissory notes or short-term securities, from time to time, in an aggregate principal amount of not more than $500 million outstanding at any one time, during the period January 1, 1997 through December 31, 1998, with a final maturity date no later than December 31, 1999. Comment date: October 24, 1996, in accordance with Standard Paragraph E at the end of this notice. 6. William H. Grigg [Docket No. ID-2980-000] Take notice that on September 19, 1996, William H. Grigg filed an application pursuant to Section 305(b) of the Federal Power Act to hold the following positions: Chairman of the Board of and Chief Executive Officer, Duke Power Company Director, Coltec Industries Inc. Comment date: October 15, 1996, in accordance with Standard Paragraph E at the end of this notice. Standard Paragraph E. Any person desiring to be heard or to protest said filing should file a motion to intervene or protest with the Federal Energy Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426, in accordance with Rules 211 and 214 of the Commission's Rules of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such motions or protests should be filed on or before the comment date. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a motion to intervene. Copies of this filing are on file with the Commission and are available for public inspection. Lois D. Cashell, Secretary. [FR Doc. 96-25685 Filed 10-07-96; 8:45 am] BILLING CODE 6717-01-P