    Take notice that on August 9, 1996, Florida Gas Transmission 
Company (FGT), 1400 Smith Street, P.O. Box 1188, Houston, Texas 77251-
1188, filed in Docket No. CP96-702-000 a request pursuant to Sections 
157.205 and 157.212 of the Commission's Regulations under the Natural 
Gas Act (18 CFR 157.205, 157.212) for authorization to construct, own, 
and operate a new delivery point in Indian River County, Florida for 
City Gas Company of Florida (CGC) under FGT's blanket certificate 
issued in Docket No. CP82-553-000 pursuant to Section 7 of the Natural 
Gas Act, all as more fully set forth in the request that is on file 
with the Commission and open to public inspection.
    FGT proposes to construct the delivery point adjacent to FGT's 20-
inch and 26-inch mainlines and will include connection to the existing 
taps, a rotary meter, approximately 100 feet of 4-inch line, and any 
related appurtenant facilities necessary for FGT to deliver up to 144 
MMBtu per hour to CGC.
    Any person or the Commission's staff may, within 45 days after 
issuance of the instant notice by the Commission, file pursuant to Rule 
214 of the Commission's Rules of Practice and Procedure (18 CFR 
385.214) a motion to intervene or notice of intervention and pursuant 
to Section 157.205 of the Regulations under the Natural Gas Act (18 CFR 
157.205) a protest to the request. If no protest is filed within the 
time allowed therefor, the proposed activity shall be deemed to be 
authorized effective the day after the time allowed for filing a 
protest. If a protest is filed and not withdrawn

[[Page 43049]]

within 30 days after the time allowed for filing a protest, the instant 
request shall be treated as an application for authorization pursuant 
to Section 7 of the Natural Gas Act.