[Federal Register Volume 61, Number 126 (Friday, June 28, 1996)] [Notices] [Pages 33735-33736] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 96-16606] ----------------------------------------------------------------------- ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-5470-8] Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564-7167 OR (202) 564-7153. Weekly receipt of Environmental Impact Statements Filed June 17, 1996 Through June 21, 1996 Pursuant to 40 CFR 1506.9. EIS No. 960285, Final EIS, AFS, TX, Texas National Forests and Grasslands Revised Land and [[Page 33736]] Resource Management Plan, Implementation, several counties, TX, Due: July 29, 1996, Contact: William S. Bartush (409) 639-8501. EIS No. 960286, Draft EIS, COE, CA, US Food and Drug Administration Laboratory, Land Acquisition, Construction and Operation on the North Campus Area at the University of California, Irvine, Orange County, CA, Due: August 12, 1996, Contact: Mr. Alex Watt (213) 452-3860. EIS No. 960287, Draft EIS, TVA, TN, GA, MS, VA, AL, KY, NC, Shoreline Management Initiative: An Assessment of Residential Shoreline Development Impacts in the Tennessee Valley, Mainstream Tennessee River and Tributary Reserviors in AL, KY, NC, TN, GA, MS and VA, Due: August 31, 1996, Contact: Ronald D. Davis, Sr. (800) 882-5263. EIS No. 960288, Draft EIS, FRC, WI, Peshtigo River Multiple Hydroelectric Project, Six Existing Hydroelectric Projects Relicensing, Caldron Falls (FERC No. 2525), Sandstone Rapids (FERC No. 2546), High Falls (FERC No. 2595), Potato Rapids (FERC No. 2560), Johnson Falls (FERC No. 2522) and Peshtigo (FERC No. 2581), Oconto and Marinette Counties, WI, Due: August 12, 1996, Contact: Jim Haimes (202) 219-2780. EIS No. 960289, Draft EIS, GSA/UPS, NY, US Brooklyn Court Project, Demolition of the Emanuel Celler Federal Building, Construction of a New Courthouse and Renovation/Adaptive Reuse of the General Post Office at Cadman Plaza East, Kings County, NY, Due: August 12, 1996, Contact: Peter A. Sneed (GSA) (212) 264-3581. The US General Services Administration (GSA) and the US Postal Service (USPS) are Joint Lead Agencies for the above DEIS. Mr. Leon Levine, 215-931-5489 is the contact point for the USPS. EIS No. 960290, Final EIS, FHW, UT, I-15 Corridor Highway Improvements, 10800 South Street to 500 North Street, Funding, Salt Lake County, UT, Due: July 29, 1996, Contact: William R. Gedris (801) 963-0183. EIS No. 960291, Final EIS, FHW, NV, Tier 1--FEIS Northern and Western Las Vegas Beltway Establishment, Need for and Location of a Transportation Corridor, Clark County, NV, Due: July 29, 1996, Contact: Wayne G. Kinder (702) 687-5322. EIS No. 960292, Draft EIS, AFS, WV, VA, Appalachian Power/American Electric Power 765kV Transmission Line Construction, Oceana, WV to Cloverdale, WV, Right-of-Way, and Special-Use-Permits, Federal and Non Federal Land, George Washington and Jefferson National Forests, several counties, WV and VA, Due: October 07, 1996, Contact: Frank Bergmann (540) 265-6054. EIS No. 960293, Draft EIS, FTA, MO, St. Charles Corridor, Transit Improvements, MO-370 on the north, the initial Metrolink Line on the east, and the Page Avenue/Rock Island Railroad, St. Louis and St. Charles Counties, MO, Due: August 16, 1996, Contact: Lee Waddleton (816) 523-0204. EIS No. 960294, Draft EIS, COE, IN, Indianapolis North Flood Damage Reduction Feasibility Study, Construction of Floodwalls and Levees, White River, Marion County, IN, Due: August 12, 1996, Contact: William Ray Haynes (502) 582-6475. EIS No. 960295, Final EIS, EPA, TX, LA, Territorial Seas off Texas and Louisiana Oil and Gas Extraction Activities, Outer Continental Shelf (OCS), New Source NPDES Permit, Gulf of Mexico, TX and LA, Due: July 29, 1996, Contact: Joe Swick (214) 665-7456. EIS No. 960296, Final EIS, AFS, ID, Beaver/Cedar Land Change Project, Implementation, Clearwater National Forest, North Fork and Palause Ranger Districts, Clearwater and Latah Counties, ID, Due: July 29, 1996, Contact: Bill Jones (208) 476-4541. EIS No. 960297, Final EIS, FHW, MT, US 93 Highway Transportation Project, Improvements between Evaro and Polson, Funding and COE Section 404 Permit, Missoula and Lake Counties, MT, Due: July 29, 1996, Contact: Joel Marshik (406) 444-7632. EIS No. 960298, Final EIS, DOE, TN, VA, SC, Disposition of Surplus Weapons-Usable Highly Enriched Uranium (HEU) to Low Enriched Uranium (LEU), Site Selection, Y-12 Plant Oak Ridge, TN; Savannah River Site, Aiken, SC; Babcock & Wilcox Naval Nuclear Fuel Division, Lynchburg, VA and Nuclear Fuel Services Plant, Erwin, TN, Due: July 29, 1996, Contact: J. David Nulton (202) 586-4513. Amended Notices EIS No. 960197, Final Supplement, IBR, NM, CO, Animas-La Plata Project, Additional Information concerning Agricultural, Municipal and Industrial Water Supplies, Animas and La Plata Rivers, San Juan County, NM and La Plata and Montezuma Counties, CO, Due: July 29, 1996, Contact: Ken Beck (970) 385-6558. Published FR 04-26-96--Wait Period has been Reopened for an additional 30 days from the date of this Federal Register. For additional information and copies of the supporting Appendices contact the above person. Dated: June 25, 1996. B. Katherine Biggs, Associate Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 96-16606 Filed 6-27-96; 8:45 am] BILLING CODE 6560-50-P