NUCLEAR REGULATORY COMMISSION
[Docket Nos. 50-272 AND 50-311]


Public Service Electric & Gas Company; Notice of Consideration of 
Issuance of Amendments to Facility Operating Licenses, Proposed No 
Significant Hazards Consideration Determination, and Opportunity for a 
Hearing

    The U.S. Nuclear Regulatory Commission (the Commission) is 
considering issuance of amendments to Facility Operating License Nos. 
DPR-70 and DPR-75 issued to the Public Service Electric & Gas Company 
(the licensee) for operation of the Salem Nuclear Generating Station, 
Units 1 and 2, located in Salem County, New Jersey.
    The proposed amendments would make the following changes to the 
Technical Specifications: (1) Revise the Reactor Vessel Level 
Indication System (RVLIS) Action Statements to facilitate actions 
necessary for channel testing to be performed in Mode 3; (2) revise the 
Channel Calibration definition to better account for temperature 
detector channel calibration methodology; and (3) delete a requirement 
to install a jumper in the Auxiliary Feedwater actuation logic since a 
design change will result in the jumper function being performed by a 
relay.
    Before issuance of the proposed license amendments, the Commission 
will have made findings required by the Atomic Energy Act of 1954, as 
amended (the Act) and the Commission's regulations.
    The Commission has made a proposed determination that the amendment 
request involves no significant hazards consideration. Under the 
Commission's regulations in 10 CFR 50.92, this means that operation of 
the facility in accordance with the proposed

[[Page 30642]]

amendment would not (1) Involve a significant increase in the 
probability or consequences of an accident previously evaluated; or (2) 
create the possibility of a new or different kind of accident from any 
accident previously evaluated; or (3) involve a significant reduction 
in a margin of safety. As required by 10 CFR 50.91(a), the licensee has 
provided its analysis of the issue of no significant hazards 
consideration, which is presented below:

    1. The proposed change does not involve a significant increase 
in the probability or consequences of an accident previously 
evaluated.
    RVLIS is part of the safety-related display instrumentation 
[Updated Final Safety Ananlysis Report] UFSAR section 7.5. Its 
function is to display information for the operator ``to enable him 
to perform required manual functions and to determine the effect of 
manual actions taken following a reactor trip due to operational 
occurrences or accident conditions discussed in Section 15.'' RVLIS 
performs no automatic functions designed to mitigate the 
consequences of any accident.
    Since no hardware changes are being made by this proposal and 
since the RVLIS is a post-accident monitoring system, no increase in 
the probability of any evaluated accident will occur as a result of 
implementation of the proposed change.
    Other redundant, diverse instrumentation is available to 
operators to indicate inadequate core cooling.
    Since RVLIS indication has limited use under normal conditions, 
performs no automatic function to mitigate an accident, and since it 
is augmented during emergency conditions by other independent 
indications of inadequate core cooling, its increased [allowed 
outage time] AOT does not involve a significant increase in the 
probability or consequences of an accident previously evaluated.
    2. The proposed change does not create the possibility of a new 
or different kind of accident from any accident previously 
evaluated.
    RVLIS is a Post Accident Monitoring System which does not 
initiate a transient or initiate any mitigating function. RVLIS's 
function is to assist the operator once an accident occurs.
    Since no hardware changes are being made by this proposal and 
since the RVLIS is utilized as a post-accident monitoring system and 
is not considered a contributor to an accident, implementation of 
the proposed change does not create the possibility of a new or 
different kind of accident from any accident previously evaluated.
    3. The proposed change does not involve a significant reduction 
in a margin of safety.
    The proposed amendment to TS Table 3.3-11 will permit vendor 
recommended preventive maintenance-type activities to be performed 
on RVLIS following startups from extended outages. This will, 
potentially, enhance RVLIS reliability and availability and ensure 
that EOP [emergency operating procedure] data continues to be 
accurate.
    Since the RVLIS is a post-accident monitoring system that has no 
automatic initiation function, changing the AOT will have no 
significant impact on the margin of safety provided by RVLIS. In 
addition, since there are independent, diverse indications of 
inadequate core cooling available to the operator, changing the AOT 
for RVLIS will not significantly reduce the margin of safety 
provided by the post-accident monitoring system.

    The NRC staff has reviewed the licensee's analysis and, based on 
this review, it appears that the three standards of 10 CFR 50.92(c) are 
satisfied. Therefore, the NRC staff proposes to determine that the 
amendment request involves no significant hazards consideration.
    The Commission is seeking public comments on this proposed 
determination. Any comments received within 30 days after the date of 
publication of this notice will be considered in making any final 
determination.
    Normally, the Commission will not issue the amendment until the 
expiration of the 30-day notice period. However, should circumstances 
change during the notice period such that failure to act in a timely 
way would result, for example, in derating or shutdown of the facility, 
the Commission may issue the license amendment before the expiration of 
the 30-day notice period, provided that its final determination is that 
the amendment involves no significant hazards consideration. The final 
determination will consider all public and State comments received. 
Should the Commission take this action, it will publish in the Federal 
Register a notice of issuance and provide for opportunity for a hearing 
after issuance. The Commission expects that the need to take this 
action will occur very infrequently.
    Written comments may be submitted by mail to the Rules Review and 
Directives Branch, Division of Freedom of Information and Publications 
Services, Office of Administration, U.S. Nuclear Regulatory Commission, 
Washington, DC 20555-0001, and should cite the publication date and 
page number of this Federal Register notice. Written comments may also 
be delivered to Room 6D22, Two White Flint North, 11545 Rockville Pike, 
Rockville, Maryland, from 7:30 a.m. to 4:15 p.m. Federal workdays. 
Copies of written comments received may be examined at the NRC Public 
Document Room, the Gelman Building, 2120 L Street, NW., Washington, DC.
    The filing of requests for hearing and petitions for leave to 
intervene is discussed below.
    By July 17, 1996, the licensee may file a request for a hearing 
with respect to issuance of the amendment to the subject facility 
operating license and any person whose interest may be affected by this 
proceeding and who wishes to participate as a party in the proceeding 
must file a written request for a hearing and a petition for leave to 
intervene. Requests for a hearing and a petition for leave to intervene 
shall be filed in accordance with the Commission's ``Rules of Practice 
for Domestic Licensing Proceedings'' in 10 CFR Part 2. Interested 
persons should consult a current copy of 10 CFR 2.714 which is 
available at the Commission's Public Document Room, the Gelman 
Building, 2120 L Street, NW., Washington, DC, and at the local public 
document room located at the Salem Free Public Library, 112 West 
Broadway, Salem, New Jersey. If a request for a hearing or petition for 
leave to intervene is filed by the above date, the Commission or an 
Atomic Safety and Licensing Board, designated by the Commission or by 
the Chairman of the Atomic Safety and Licensing Board Panel, will rule 
on the request and/or petition; and the Secretary or the designated 
Atomic Safety and Licensing Board will issue a notice of hearing or an 
appropriate order.
    As required by 10 CFR 2.714, a petition for leave to intervene 
shall set forth with particularity the interest of the petitioner in 
the proceeding, and how that interest may be affected by the results of 
the proceeding. The petition should specifically explain the reasons 
why intervention should be permitted with particular reference to the 
following factors: (1) The nature of the petitioner's right under the 
Act to be made party to the proceeding; (2) the nature and extent of 
the petitioner's property, financial, or other interest in the 
proceeding; and (3) the possible effect of any order which may be 
entered in the proceeding on the petitioner's interest. The petition 
should also identify the specific aspect(s) of the subject matter of 
the proceeding as to which petitioner wishes to intervene. Any person 
who has filed a petition for leave to intervene or who has been 
admitted as a party may amend the petition without requesting leave of 
the Board up to 15 days prior to the first prehearing conference 
scheduled in the proceeding, but such an amended petition must satisfy 
the specificity requirements described above.
    Not later than 15 days prior to the first prehearing conference 
scheduled in the proceeding, a petitioner shall file a supplement to 
the petition to intervene which must include a list of the

[[Page 30643]]

contentions which are sought to be litigated in the matter. Each 
contention must consist of a specific statement of the issue of law or 
fact to be raised or controverted. In addition, the petitioner shall 
provide a brief explanation of the bases of the contention and a 
concise statement of the alleged facts or expert opinion which support 
the contention and on which the petitioner intends to rely in proving 
the contention at the hearing. The petitioner must also provide 
references to those specific sources and documents of which the 
petitioner is aware and on which the petitioner intends to rely to 
establish those facts or expert opinion. Petitioner must provide 
sufficient information to show that a genuine dispute exists with the 
applicant on a material issue of law or fact. Contentions shall be 
limited to matters within the scope of the amendment under 
consideration. The contention must be one which, if proven, would 
entitle the petitioner to relief. A petitioner who fails to file such a 
supplement which satisfies these requirements with respect to at least 
one contention will not be permitted to participate as a party.
    Those permitted to intervene become parties to the proceeding, 
subject to any limitations in the order granting leave to intervene, 
and have the opportunity to participate fully in the conduct of the 
hearing, including the opportunity to present evidence and cross-
examine witnesses.
    If a hearing is requested, the Commission will make a final 
determination on the issue of no significant hazards consideration. The 
final determination will serve to decide when the hearing is held.
    If the final determination is that the amendment request involves 
no significant hazards consideration, the Commission may issue the 
amendment and make it immediately effective, notwithstanding the 
request for a hearing. Any hearing held would take place after issuance 
of the amendment.
    If the final determination is that the amendment request involves a 
significant hazards consideration, any hearing held would take place 
before the issuance of any amendment.
    A request for a hearing or a petition for leave to intervene must 
be filed with the Secretary of the Commission, U.S. Nuclear Regulatory 
Commission, Washington, DC 20555-0001, Attention: Docketing and 
Services Branch, or may be delivered to the Commission's Public 
Document Room, the Gelman Building, 2120 L Street, NW., Washington, DC, 
by the above date. Where petitions are filed during the last 10 days of 
the notice period, it is requested that the petitioner promptly so 
inform the Commission by a toll-free telephone call to Western Union at 
1-(800) 248-5100 (in Missouri 1-(800) 342-6700). The Western Union 
operator should be given Datagram Identification Number N1023 and the 
following message addressed to John F. Stolz: petitioner's name and 
telephone number, date petition was mailed, plant name, and publication 
date and page number of this Federal Register notice. A copy of the 
petition should also be sent to the Office of the General Counsel, U.S. 
Nuclear Regulatory Commission, Washington, DC 20555-0001, and to Mark 
J. Wetterhahn, Esquire, Winstron and Strawn, 1400 L Street, NW., 
Washington, DC 20005-3502, attorney for the licensee.
    Nontimely filings of petitions for leave to intervene, amended 
petitions, supplemental petitions and/or requests for hearing will not 
be entertained absent a determination by the Commission, the presiding 
officer or the presiding Atomic Safety and Licensing Board that the 
petition and/or request should be granted based upon a balancing of the 
factors specified in 10 CFR 2.714(a)(1) (i)-(v) and 2.714(d).
    For further details with respect to this action, see the 
application for amendment dated May 31, 1996, which is available for 
public inspection at the Commission's Public Document Room, the Gelman 
Building, 2120 L Street, NW., Washington, DC, and at the local public 
document room located at the Salem Free Public Library, 112 West 
Broadway, Salem, New Jersey.

    Dated at Rockville, Maryland, this 12th day of June 1996.

    For the Nuclear Regulatory Commission.
Leonard N. Olshan,
Senior Project Manager, Project Directorate I-2, Division of Reactor 
Projects I/II, Office of Nuclear Reactor Regulation.