[Federal Register Volume 61, Number 25 (Tuesday, February 6, 1996)] [Notices] [Pages 4495-4496] From the Federal Register Online via the Government Publishing Office [www.gpo.gov] [FR Doc No: 96-2440] ----------------------------------------------------------------------- NUCLEAR REGULATORY COMMISSION [Docket No. 40-3453] Atlas Corp.; Site-Reclamation Milestone; Hearings AGENCY: Nuclear Regulatory Commission. ACTION: Notice of receipt of a request from Atlas Corporation to revise a site-reclamation milestone in license no. SUA-917 for the Moab, Utah facility and notice of opportunity for a hearing. ----------------------------------------------------------------------- SUMMARY: Notice is hereby given that the U.S. Nuclear Regulatory Commission (NRC) has received, by letter dated January 9, 1996, a request from Atlas Corporation (Atlas) to amend License Condition (LC) 55 A.(1) of Source Material License SUA-917 for the Moab, Utah facility. The license amendment request proposes to modify LC 55 A.(1) to change the completion date for retrieval of windblown tailings and placement on the pile. The date proposed by Atlas would extend completion of retrieval and placement of windblown tailings by two years. FOR FURTHER INFORMATION CONTACT: Myron Fliegel, Office of Nuclear Material Safety and Safeguards, Washington, DC 20555. Telephone (301) 415-6629. SUPPLEMENTARY INFORMATION: The portion of LC 55 A.(1) with the proposed change would read as follows: A. To ensure timely compliance with target completion dates established in the Memorandum of Understanding with the Environmental Protection Agency (56 FR 55432, October 25, 1991), the licensee shall complete reclamation to control radon emissions as expeditiously as practicable, considering technological feasibility, in accordance with the following schedule: (1) Windblown tailings retrieval and placement on the pile-- December 31, 1997. Atlas' request to amend LC 55 A.(1) of Source Material License SUA- 917, which describes the proposed changes to the license condition and the reason for the request, is being made available for public inspection at the NRC's Public Document Room at 2120 L Street, NW. (Lower Level), Washington, DC 20555. The NRC hereby provides notice of an opportunity for a hearing on the license amendment under the provisions of 10 CFR part 2, subpart L, ``Informal Hearing Procedures for Adjudications in Materials and Operator Licensing Proceedings.'' Pursuant to Sec. 2.1205(a), any person whose interest may be affected by this proceeding may file a request for a hearing. In accordance with Sec. 2.1205(c), a request for hearing must be filed within 30 days of the publication of this notice in the Federal Register. The request for a hearing must be filed with the Office of the Secretary, either: (1) By delivery to the Docketing and Service Branch of the Office of the Secretary at One White Flint North, 11555 Rockville Pike, Rockville, MD 20852; or (2) By mail or telegram addressed to the Secretary, U.S. Nuclear Regulatory Commission, Washington, DC 20555, Attention: Docketing and Service Branch. In accordance with 10 CFR 2.1205(e), each request for a hearing must also be served, by delivering it personally or by mail, to: (1) The applicant, Atlas Corporation, Republic Plaza, 370 Seventeenth Street, Suite 3150, Denver, Colorado 80202, Attention: Richard Blubaugh; and (2) The NRC staff, by delivery to the Executive Director for Operations, One [[Page 4496]] White Flint North, 11555 Rockville Pike, Rockville, MD 20852 or by mail addressed to the Executive Director for Operations, U.S. Nuclear Regulatory Commission, Washington, DC 20555. In addition to meeting other applicable requirements of 10 CFR Part 2 of the NRC's regulations, a request for a hearing filed by a person other than an applicant must describe in detail: (1) The interest of the requestor in the proceeding; (2) How that interest may be affected by the results of the proceeding, including the reasons why the requestor should be permitted a hearing, with particular reference to the factors set out in Sec. 2.1205(g); (3) The requestor's areas of concern about the licensing activity that is the subject matter of the proceeding; and (4) The circumstances establishing that the request for a hearing is timely in accordance with Sec. 2.1205(c). The request must also set forth the specific aspect or aspects of the subject matter of the proceeding as to which petitioner wishes a hearing. Dated at Rockville, MD, this 29th day of January 1996. For the U.S. Nuclear Regulatory Commission. Joseph J. Holonich, Chief, High-Level Waste and Uranium Recovery Projects Branch, Division of Waste Management, Office of Nuclear Material Safety and Safeguards. [FR Doc. 96-2440 Filed 2-5-96; 8:45 am] BILLING CODE 7590-01-P