[Federal Register Volume 60, Number 213 (Friday, November 3, 1995)]
[Notices]
[Pages 55841-55842]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-27353]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-5230-3]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 260-5076 or (202) 260-5075.
Weekly receipt of Environmental Impact Statements Filed October 23,
1995 Through October 27, 1995 Pursuant to 40 CFR 1506.9.
EIS No. 950490, Final EIS, FHW, WI-13 Marshfield Regional Mobility
Study for Transportation Improvements, Funding and COE Section 404
Permit, City of Marshfield, Wood and Marathon Counties, WI, Due:
December 8, 1995, Contact: Richard C. Madrzak (608) 264-5968.
EIS No. 950491, Draft EIS, AFS, ID, Beaver/Cedar Land Change Project,
Implementation, Clearwater National Forest, North Fork and Palause
Ranger Districts, Clearwater and Latah Counties, ID, Due: December 18,
1995, Contact: Bill Jones (208) 476-4541.
EIS No. 950492, Final EIS, FHW, VA, Madison Heights Bypass/US 29
Construction, US 50 south of the City of Lynchburg to US 29 south of
the Town of Amherst, Funding and COE Permit, Amherst and Campbell
Counties, VA, Due: December 4, 1995, Contact: Roberto Fonseca-Martinez
(804) 281-5100.
EIS No. 950493, Draft EIS, USN, CA, Camp Pendleton Marine Corps Air
Stations (MCAS) Tustin and EL Toro Marine Corps Base (MCB) Realignment,
Implementation, COE Section 404 Permit, San Diego County, CA, Due:
December 18, 1995, Contact: Harry Roberts (714) 726-3383.
EIS No. 950494, Draft EIS, FHW, UT, US 89 Corridor Transportation
Improvements, I-15/Farmington to Harrison Boulevard/South Ogden,
Funding, COE Section 404 and NPDES Permits, Davis, Weber, Morgan and
Salt Lake Counties, UT, Due: December 19, 1995, Contact: William R.
Gedris (801) 963-0183.
EIS No. 950495, Final EIS, AFS, AZ, NM, Southwestern Region Amendment
of Forest Plans, Implementation, Standard and Guidelines for Northern
Goshawk and
[[Page 55842]]
Mexican Spotted Owl, AZ and NM, Due: December 4, 1995, Contact: Arthur
S. Briggs (505) 842-3212.
EIS No. 950496, Draft EIS, AFS, ID, Salmon River Corridor,
Implementation, Sawtooth National Recreation Area (SNRA), Sawtooth
Forest Land and Resource Management Plan (FLRMP), Custer County, ID,
Due: December 18, 1995, Contact: Lisa Stoeffer (208) 774-3681.
EIS No. 950497, Final EIS, GSA, OH, Cleveland United States Courthouse,
Site Selection, Construction and Operation, Cuyahoga County, OH, Due:
December 4, 1995, Contact: Jennifer Enyart (312) 886-5544.
EIS No. 950498, Final EIS, NPS, FL, Timucuan Ecological and Historic
Preserve, General Management Plan and Development Concept Plans,
Implementation, Fort Caroline National Memorial Area, Duval County, FL,
Due: December 4, 1995, Contact: Suzanne Lewis (904) 221-5568.
EIS No. 950499, Draft EIS, COE, DE, Delaware Coast from Cape Henlopen
to Fenwick Island Feasbility Study, Rehoboth Beach and Dewey Beach
Project, Storm Damage Reduction, Sussex County, DE, Due: December 18,
1995, Contact: Steve Allen (215) 656-6555.
EIS No. 950500, Draft EIS, FHW, FL, Miami International Airport (MIA)
Landside Terminal Construction, FL-112 on the North, FL-836 on the
South; NW 27th Avenue on the East, along FL-836 that extends West to NW
57th Avenue, Dade County, FL, Due: December 18, 1995, Contact: J.R.
Skinner (904) 942-9579.
EIS No. 950501, Draft EIS, AFS, AK, Control Lake Timber Sale,
Implementation, Prince of Wales Island, Tongass National Forest, AK,
Due: December 26, 1995, Contact: Dave Arrasmith (907) 225-3101.
EIS No. 950502, Final EIS, COE, TX, Gulf Intracoastal Waterway (Section
216 Study), Bank Protection and a Spill Containment Feature,
Implementation, Aransas National Wildlife Refuge, Galvestion District,
Aransas, Calhoun and Refugio Counties, TX, Due: December 04, 1995,
Contact: Richard Medina (409) 766-3044.
EIS No. 950503, Draft EIS, DOE, WA, Northwest Regional Power Facility
(NRPF), Construction and Operation of a 838 Megawatt (MW) Gas-fired
Combustion Turbine Facility, Approval of Permits, Located near the Town
of Creston, WA, Due: December 18, 1995, Contact: Nancy Wittpen (503)
230-3297.
EIS No. 950504, Draft EIS, FHW, FL, East-West Multimodal Corridor
Transportation Improvements, Begining at the Tamiami Campus of Florida
International University (FIU) extending the length of FL 836, Port of
Miami, Dade County, FL, Due: December 18, 1995, Contact: J.R. Skinner
(904) 681-7223.
EIS No. 950505, Final EIS, FTA, PR, Tren Urbano Transit Project,
Improvement, San Juan Metropolitan Area, Funding, NPDES Permit, US
Coast Guard Bridge Permit and COE Section 10 and 404 Permits, PR, Due:
December 06, 1995, Contact: Alex McNeil (404) 347-7875.
Amended Notices
EIS No. 950485, Draft EIS, COE, LA, Programmatic EIS--Marsh Management
Project, Hydrologic Manipulation, COE Section 10 and 404 Permit
Issuance, Coastal Wetland of Louisiana a part of the Coastal Wetlands
Planning, Protection and Restoration Act (CWPPRA) River Basins, LA,
Due: January 02, 1996, Contact: Robert Bonsenberg (504) 862-2522.
Published FR 10-27-95--Review period extended.
Dated: October 30, 1995.
B. Katherine Biggs,
Associate Director, NEPA Compliance Division, Office of Federal
Activities.
[FR Doc. 95-27353 Filed 11-2-95; 8:45 am]
BILLING CODE 6560-50-U