[Federal Register Volume 60, Number 175 (Monday, September 11, 1995)]
[Notices]
[Pages 47158-47159]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-22451]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER95-1630-000, et al.]
PECO Energy Corporation, et al.; Electric Rate and Corporate
Regulation Filings
September 1, 1995.
Take notice that the following filings have been made with the
Commission:
1. PECO Energy Company
[Docket No. ER95-1630-000]
Take notice that on August 28, 1995, PECO Energy Company (PECO)
filed a Service Agreement dated August 17, 1995, with Ohio Edison
Company (OE) under PECO's FERC Electric Tariff Original Volume No. 1
(Tariff). The Service Agreement adds OE as a customer under the Tariff.
PECO requests an effective date of August 17, 1995, for the Service
Agreement.
PECO states that copies of this filing have been supplied to OE and
to the Pennsylvania Public Utility Commission.
Comment date: September 15, 1995, in accordance with Standard
Paragraph E at the end of this notice.
2. PECO Energy Company
[Docket No. ER95-1631-000]
Take notice that on August 28, 1995, PECO Energy Company (PECO),
filed a Service Agreement dated August 22, 1995, with LG&E Power
Marketing Inc. (LG&E) under PECO's FERC Electric Tariff Original Volume
No. 1 (Tariff). The Service Agreement adds LG&E as a customer under the
Tariff.
PECO requests an effective date of August 22, 1995, for the Service
Agreement.
PECO states that copies of this filing have been supplied to LG&E
and to the Pennsylvania Public Utility Commission.
Comment date: September 15, 1995, in accordance with Standard
Paragraph E at the end of this notice.
3. PECO Energy Company
[Docket No. ER95-1632-000]
Take notice that on August 28, 1995, PECO Energy Company (PECO),
filed a Service Agreement dated August 22, 1995, with Northern Indiana
Public Service Company (NIPSCO) under PECO's FERC Electric Tariff
Original Volume No. 1 (Tariff). The Service Agreement adds NIPSCO as a
customer under the Tariff.
PECO requests an effective date of August 22, 1995, for the Service
Agreement.
PECO states that copies of this filing have been supplied to NIPSCO
and to the Pennsylvania Public Utility Commission.
Comment date: September 15, 1995, in accordance with Standard
Paragraph E at the end of this notice.
4. Engelhard Power Marketing, Inc.
[Docket No. ER95-1633-000]
Take notice that on August 28, 1995, Engelhard Power Marketing,
Inc. (ENGL), tendered for filing a letter from the Executive Committee
of the Western Systems Power Pool (WSPP) indicating that ENGL had
completed all the steps for pool membership. ENGL requests that the
Commission amend the WSPP Agreement to include it as a member.
ENGL requests an effective date of August 17, 1995, for the
proposed amendment. Accordingly, ENGL requests waiver of the
Commission's notice requirements for good cause shown.
Copies of the filing were served upon the WSPP Executive Committee.
Comment date: September 15, 1995, in accordance with Standard
Paragraph E at the end of this notice.
5. Illinois Power Company
[Docket No. ER95-1634-000]
Take notice that on August 28, 1995, Illinois Power Company
(Illinois), tendered for filing an Interchange Agreement between
Illinois and Kimball Power Company (Kimball). Illinois states that the
purpose of this agreement is to provide for the buying and selling of
capacity and energy between Illinois and Kimball.
Comment date: September 15, 1995, in accordance with Standard
Paragraph E at the end of this notice.
6. Northeast Utilities Service Company
[Docket No. ER95-1635-000]
Take notice that on August 28, 1995, Northeast Utilities Service
Company (NUSCO), tendered for filing, a unit exchange agreement between
NUSCO, on behalf of The Connecticut Light and Power Company, Western
Massachusetts Electric Company, Holyoke Water Power Company, Holyoke
Power and Electric Company and Public Service Company of New Hampshire,
and Central Maine Power Company (CMP).
NUSCO states that a copy of this filing has been mailed to CMP.
NUSCO requests that the Agreement become effective on November 1,
1995.
Comment date: September 15, 1995, in accordance with Standard
Paragraph E at the end of this notice.
7. Delmarva Power and Light Company
[Docket No. ER95-1639-000]
Take notice that on August 28, 1995, Delmarva Power and Light
Company (Delmarva Power), tendered for filing a tariff providing for
comprehensive transmission service. Delmarva Power states that its
filing modifies its Tariff No. 2 that was filed in Docket No. ER95-222-
000 and that its tariff is consistent with the draft pro forma tariffs
the Commission included with the proposed rule in ``Promoting Wholesale
Competition Through Open-Access Non-Discriminatory Transmission
Services by Public Utilities,'' Docket No. RM95-8-000, IV FERC Stats.
and Regs. para.32,514 (1995). Delmarva Power asks the Commission to set
an effective date for this filing of November 1, 1995.
[[Page 47159]]
Comment date: September 15, 1995, in accordance with Standard
Paragraph E at the end of this notice.
8. Delmarva Power & Light Company
[Docket No. ER95-1640-000]
Take notice that on August 28, 1995, Delmarva Power & Light Company
(Delmarva) of Wilmington, Delaware, tendered for filing revised rate
schedule sheets, and a request to suspend the operation of its fuel
clause for the purposes of making a one-time refund of fuel expense
over-collections and of resetting its Fuel Adjustments. The Company is
proposing several revisions to its rate schedules to define more
clearly the operation of the fuel adjustment clause. These revisions
involve the following customers and rate schedules: Seaford, Rate
Schedule 62; Berlin, Rate Schedule 63; Middletown, Rate Schedule 65;
and Smyrna, Rate Schedule 68. Delmarva requests an effective date of
October 27, 1995.
Comment date: September 15, 1995, in accordance with Standard
Paragraph E at the end of this notice.
9. Brooklyn Navy Yard Cogeneration Partners, L.P.
[Docket No. QF95-302-000]
On August 16, 1995, Brooklyn Navy Yard Cogeneration Partners, L.P.
of 366 Madison Avenue, Suite 1103, New York, New York 10017, submitted
for filing an application for certification of a facility as a
qualifying cogeneration facility pursuant to Section 292.207(b) of the
Commission's Regulations. No determination has been made that the
submittal constitutes a complete filing.
According to the applicant, the natural gas-fired topping-cycle
cogeneration facility is located in Kings County, Brooklyn, New York.
The facility will consist of two combustion turbine generators, two
unfired heat recovery boilers, two extraction/condensing steam turbine
generators, and related interconnection equipment. The maximum net
power production capacity of the facility will be 315 MW. Thermal
energy recovered from the facility will be used for space heating,
water distillation and waste water treatment purposes. Installation of
the facility began in January of 1995.
Comment date: October 11, 1995 in accordance with Standard
Paragraph E at the end of this notice.
Standard Paragraph
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 825 North Capitol Street, N.E., Washington, D.C.
20426, in accordance with Rules 211 and 214 of the Commission's Rules
of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protests should be filed on or before the comment date.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a motion to intervene. Copies of this filing are on file with the
Commission and are available for public inspection.
Lois D. Cashell,
Secretary.
[FR Doc. 95-22451 Filed 9-8-95; 8:45 am]
BILLING CODE 6717-01-P