[Federal Register Volume 60, Number 155 (Friday, August 11, 1995)]
[Notices]
[Pages 41064-41066]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-19887]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. CP93-613-004, et al.]
Northwest Pipeline Corporation, et al.; Natural Gas Certificate
Filings
August 4, 1995.
Take notice that the following filings have been made with the
Commission:
1. Northwest Pipeline Corporation
[Docket Nos. CP93-613-004, CP93-673-004]
Take notice that on July 24, 1995, Northwest Pipeline Corporation
(Northwest), 295 Chipeta Way, Salt Lake City, Utah 84158, filed an
abbreviated petition, pursuant to Sections 7(b) and 7(c) of the Natural
Gas Act in Docket Nos. CP93-613-004 and CP93-673-004, to amend the
Commission order issued April 19, 1995 in the referenced dockets.
Northwest requests authorization to downsize or eliminate certain
components of the Expansion II Project; revise the allocation of
certificated facilities between the Expansion II and Northwest Natural
Expansion Projects; and extend the time for construction of the
Weyerhaeuser Lateral and Weyerhaeuser Meter Station; all as more fully
set forth in the petition to amend which is on file with the Commission
and open to the public inspection.
Northwest states that the Northwest Natural Expansion Project will
still provide 102,000 Dth per day of mainline capacity for Northwest
Natural Gas Company. Further, Northwest says the only impacts of the
proposed design changes on the Northwest Natural Expansion Project are
new requirements for 1,241 additional horsepower at the existing
Goldendale Compressor Station and restaging of existing units at the
Albany and Eugene Compressor Stations. Northwest states that these
requirements will be satisfied by allocating to the Northwest Natural
Expansion Project the Albany and Eugene restaging and a $3.4 million
share of an additional Goldendale compressor unit, all already
authorized to be installed at Goldendale for the Northwest Expansion II
Project. Northwest states that these allocations from the Northwest
Expansion II Project, along with updated cost estimates for all
components of the project, results in a revised estimated cost for the
Northwest Natural Expansion Project of $52.5 million.
Northwest indicates that, for the Northwest Expansion II Project,
which now will provide 42,175 Dth per day of mainline capacity for 11
shippers (reduced from 62,175 Dth per day), the proposed design changes
include:
(1) The aforementioned allocation of previously authorized
facilities to the Northwest Natural Expansion Project from the
Expansion II Project;
(2) A 3.1 mile reduction in the length of the 24-inch Soda Springs
North Loop and elimination of the Soda Springs Meter Station crossover
tap;
(3) Elimination of various modifications to existing compression
facilities at the Roosevelt, Washougal, Oregon City, McMinnville and
Lava Hot Springs Compressor Stations; and
(4) Elimination of a tap and associated piping and valves at the
Longview Meter Station (Northwest says these facilities were previously
installed as part of a Section 284.3(c) exempt facility).
Northwest states that the foregoing facility reductions, along with
updated cost estimates for the remaining project components, result in
a current estimated cost for the Northwest Expansion II Project of
$64.0 million ($53.1 million for mainline facilities plus $10.9 million
for two incremental laterals).
Finally, Northwest requests the Commission to grant a 30 month
extension of time, until October 19, 1998, for construction of the
authorized Weyerhaeuser Lateral and Meter Station to be completed,
consistent with Weyerhaeuser's current schedule for building its
cogeneration plant which will require service through these facilities.
Comment date: August 25, 1995, in accordance with the first
paragraph of Standard Paragraph F at the end of this notice.
2. Panhandle Eastern Pipe Line Company
[Docket No. CP95-648-000]
Take notice that on July 31, 1995, Panhandle Eastern Pipe Line
Company (Panhandle), P.O. Box 1642, Houston, Texas 77251-1642, filed in
Docket No. CP95-648-000 a request pursuant to Secs. 157.205 and 157.216
of the Commission's Regulations under the Natural Gas Act (18 CFR
157.205, 157.216) for authorization to abandon in place approximately
6,911 feet of 3-inch diameter pipeline and appurtenant facilities under
Panhandle's blanket certificate issued in Docket No. CP83-83-000
pursuant to Section 7 of the Natural Gas Act, all as more fully set
forth in the request that is on file with the Commission and open to
public inspection.
Panhandle proposes to abandon 6,911 feet of 3-inch diameter
pipeline on Panhandle's Marblehead lateral, line No. 45-05-001-27 and
appurtenant facilities located in Quincy, Adams County, Illinois.
Comment date: September 18, 1995, in accordance with Standard
Paragraph G at the end of this notice.
3. National Fuel Gas Supply Corporation
[Docket No. CP95-649-000]
Take notice that on July 31, 1995, National Fuel Gas Supply
Corporation (National), 10 Lafayette Square, Buffalo, New York 14203,
filed in Docket No. CP95-649-000, an application pursuant to
Secs. 157.205 and 157.211 of the Commission's Regulations under the
Natural Gas Act (NGA) (18 CFR 157.205, and 157.211) for authorization
to construct and operate a sales tap for delivery of gas to a new
residential customer of National Fuel Gas Distribution Corporation
(Distribution) under authorization issued in Docket
[[Page 41065]]
No. CP83-4-000, pursuant to Section 7 of the Natural Gas Act, all as
more fully set forth in the request which is on file with the
Commission and open to public inspection.
National proposes to construct and operate a new residential sales
tap in North East Township, Erie County, Pennsylvania. The total
proposed estimated deliveries for this sales tap are 150 Mcf annually
and would be transported and delivered under National's Rate Schedule
EFT. National states that the gas volumes would have a minimal impact
on National's peak day and annual deliveries.
National further states that the estimated cost of the proposed new
delivery point is $1,500. It is stated that Distribution would
reimburse National for the cost of the construction of the tap.
Comment date: September 18, 1995, in accordance with Standard
Paragraph G at the end of this notice.
4. CNG Transmission Corporation
[Docket No. CP95-651-000]
Take notice that on July 31, 1995, CNG Transmission Corporation
(CNGT), 445 West Main Street, Clarksburg, West Virginia 26301, filed in
Docket No. CP95-651-000 a request pursuant to Sections 157.205 and
157.211 of the Commission's Regulations under the Natural Gas Act (18
CFR 157.205, 157.211) for authorization to construct and operate a
measuring and regulation station under CNGT's blanket certificate
issued in Docket No. CP82-537-000 pursuant to Section 7 of the Natural
Gas Act, all as more fully set forth in the request that is on file
with the Commission and open to public inspection.
CNGT proposes to construct a new measuring and regulation station
in Chemung County, New York. The facilities will serve as a new
interconnection to New York State Electric and Gas Corporation, for
receipt and delivery on a firm basis of up to 80,000 Dth of natural gas
per day.
Comment date: September 18, 1995, in accordance with Standard
Paragraph G at the end of this notice.
5. Columbia Gas Transmission Corporation
[Docket No. CP95-657-000]
Take notice that on August 2, 1995, Columbia Gas Transmission
Corporation (Columbia), 1700 MacCorkle Avenue, S.E., Charleston, West
Virginia 25314-1273, filed in Docket No. CP95-657-000 a petition
pursuant to Rule 207 of the Commission's Rules of Practice and
Procedure (18 CFR 385.207) for a declaratory order: (1) Finding that
certain meter facilities which Columbia functionalized as gathering
facilities in fact perform a transmission function and should be
refunctionalized as transmission facilities for rate and accounting
purposes, (2) authorizing Columbia to record these facilities and
related costs on its accounting books and records as transmission
facilities, and (3) confirming that these facilities do not require
Section 7(c) certificate authority, all as more fully set forth in the
petition on file with the Commission and open to public inspection.
Columbia requests that 644 receipt meters located within the states
of Kentucky, New York, Ohio, Pennsylvania and West Virginia be
refunctionalized from the gathering function to the transmission
function for rate and accounting purposes. Columbia states that in each
case the meter represents the point of entry into Columbia's system and
serves the purpose of measuring the flow of gas from a facility owned
by a third party into a Columbia-owned transmission line. Columbia
states that the proposed refunctionalization is reflected in its rate
case filed on August 1, 1995 in Docket No. RP95-408-000.
Columbia also requests that the Commission confirm that the 644
receipt meters do not require Section 7(c) authority, as they are not
``facilities'' within the meaning of the Natural Gas Act, and are
exempt pursuant to Commission's Regulations (18 CFR 2.55).
Comment date: August 25, 1995, in accordance with the first
paragraph of Standard Paragraph F at the end of this notice.
6. Virginia Gas Storage Company
[Docket No. CP95-660-000]
Take notice that on August 2, 1995, Virginia Gas Storage Company
(VGS) tendered for filing under Section 7(c) of the Natural Gas Act
(NGA) and Section 284.224 of the Regulations of the Federal Energy
Regulatory Commission (Commission), an application for a certificate of
public convenience and necessity authorizing VGS to participate in
storage of natural gas authorized under 18 CFR Part 284 of the
Commission's Regulations, all as more fully set forth in the request
which is on file with the Commission and open to public inspection.
VGS states that it is an intrastate facility whose rates, services,
and facilities are subject to the regulation of the State Corporation
Commission of the Commonwealth of Virginia (VSCC), with its rates and
tariffs subject to the jurisdiction of the VSCC. VGS further states
that it is exempt from the Commission's Regulations under Section 1(c)
of the NGA.
VGS states that it is proposing to provide storage service from the
Early Grove underground storage field located in Scott and Washington
Counties in Virginia. VGS proposes to provide open-access conditions
set forth in Sec. 284.224 of the Commission's Regulations.
Comment date: August 25, 1995, in accordance with the first
paragraph of Standard Paragraph F at the end of this notice.
Standard Paragraphs
F. Any person desiring to be heard or to make any protest with
reference to said application should on or before the comment date,
file with the Federal Energy Regulatory Commission, Washington, D.C.
20426, a motion to intervene or a protest in accordance with the
requirements of the Commission's Rules of Practice and Procedure (18
CFR 385.214 or 385.211) and the Regulations under the Natural Gas Act
(18 CFR 157.10). All protests filed with the Commission will be
considered by it in determining the appropriate action to be taken but
will not serve to make the protestants parties to the proceeding. Any
person wishing to become a party to a proceeding or to participate as a
party in any hearing therein must file a motion to intervene in
accordance with the Commission's Rules.
Take further notice that, pursuant to the authority contained in
and subject to the jurisdiction conferred upon the Federal Energy
Regulatory Commission by Sections 7 and 15 of the Natural Gas Act and
the Commission's Rules of Practice and Procedure, a hearing will be
held without further notice before the Commission or its designee on
this application if no motion to intervene is filed within the time
required herein, if the Commission on its own review of the matter
finds that a grant of the certificate and/or permission and approval
for the proposed abandonment are required by the public convenience and
necessity. If a motion for leave to intervene is timely filed, or if
the Commission on its own motion believes that a formal hearing is
required, further notice of such hearing will be duly given.
Under the procedure herein provided for, unless otherwise advised,
it will be unnecessary for applicant to appear or be represented at the
hearing.
G. Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR
[[Page 41066]]
385.214) a motion to intervene or notice of intervention and pursuant
to Sec. 157.205 of the Regulations under the Natural Gas Act (18 CFR
157.205) a protest to the request. If no protest is filed within the
time allowed therefor, the proposed activity shall be deemed to be
authorized effective the day after the time allowed for filing a
protest. If a protest is filed and not withdrawn within 30 days after
the time allowed for filing a protest, the instant request shall be
treated as an application for authorization pursuant to Section 7 of
the Natural Gas Act.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 95-19887 Filed 8-10-95; 8:45 am]
BILLING CODE 6717-01-P