[Federal Register Volume 60, Number 130 (Friday, July 7, 1995)]
[Notices]
[Pages 35392-35393]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-16772]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-4724-7]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared May 29, 1995 Through June 02,
1995 pursuant to the Environmental Review Process (ERP), under Section
309 of the Clean Air Act and Section 102(2)(c) of the National
Environmental Policy Act as amended. Requests for copies of EPA
comments can be directed to the Office of Federal Activities at (202)
260-5076.
An explanation of the ratings assigned to draft environmental
impact statements (EISs) was published in FR dated April 14, 1995 (60
FR 19047).
Draft EISs
ERP No. D-AFS-K99025-CA Rating EC2, Pacific Pipeline Transportation
Project, Construction/Operation, Right-of-Way Grant, Special-Use-
Permit, COE Section 10 and 404 Permits, Angeles National Forest, Santa
Barbara, Ventura, Los Angeles and Kern Counties, CA.
Summary: EPA expressed environmental concerns over potential
adverse impacts to water and air quality and environmental justice
issues.
ERP No. D-BLM-K67030-NV Rating EC2, Bald Mountain Gold Mine
Expansion Project, within the Horseshoe/Galaxy Mine, Plan of Operation
Approval and COE Section 404 Permit, White Pine and Elko Counties, NV.
Summary: EPA expressed environmental concerns about the proposed
project's potential impact to water quality. EPA suggests additional
information be included in the final EIS on potential impacts to water
and air quality, waste rock characterization and disposal, mitigation
measures and monitoring.
ERP No. D-BOP-G81008-LA Rating LO, Pollock US Penitentiary and
Federal Prison Camp (FPC), Construction and Operation and Site
Selection of a former World War II Military Installation, Grant Parish,
LA.
Summary: While EPA has no objection to the proposed action, it
requested that the final document provide additional discussion of the
potable water and wastewater treatment facilities.
ERP No. D-DOE-G06006-NM Rating LO, Dual Axis Radiographic
Hydrodynamic Test (DARHT) Facility, Construction and Operation,
Approval of Operating Permit, Los Alamos National Laboratory (LANL),
Los Alamos and Santa Fe Counties, NM.
Summary: While EPA has no objection to the proposed action, it did
suggest that all dynamic test be contained.
ERP No. D-DOE-L05212-WA Rating LO, Columbia Wind Farm #1 Project,
Construction and Operation of a 25 Megawatt (MW) Wind Power Project in
the Columbia Hills Area, Conditional-Use-Permit, NPDES Permit and COE
Section 404 Permit, Klickitat County, WA.
Summary: EPA abbreviated review has revealed no concerns on this
project.
ERP No. DR-FHW-L40191-AK Rating LO, Whittier Access Project,
Additional Information, Construction between Port of Whittier and
Seward Highway, Funding, Right-of-Way Agreement and COE Section 10 and
404 Permits, Chugauch National Forest, Municipality of Anchorage, City
of Whittier, AK.
Summary: EPA previous concerns have been adequately addressed,
therefore EPA has no objection to the proposed action.
ERP No. DS-COE-G32051-TX Rating LO, Galveston Bay Area Navigation
Improvements, Houston Ship and Galveston Channels, Additional
Information, Funding and Implementation, Galveston and Harris Counties,
TX.
Summary: EPA has no objection to the proposed action.
Final EISs
ERP No. F-BLM-K67028-CA Rand Open Pit Heap Leach Gold Mine Project,
Construction, Expansion and Operation, Conditional-Use-Permit and Plan
of Operations and Reclamation Plan Approval, Randburg, Kern County, CA.
Summary: Review of the final EIS was not deemed necessary. No
formal comment letter was sent to the preparing agency.
ERP No. F-FHW-E40736-NC Greensboro Western Urban Loop
Transportation Improvement, from Lawndale Drive near Cottage Place to
I-85 South near Holden Road, Funding, Right-of-Way Acquisition, and COE
Section 404 Permit, Guilford County, NC.
[[Page 35393]]
Summary: EPA expressed environmental concerns about the long term
noise impact to numerous sensitive receptors.
ERP No. F-IBR-K39048-AZ Glen Canyon Dam Operation, Implementation,
Colorado River Storage Project, Funding and COE Section 10 and 404
Permits, Coconino County, AZ.
Summary: EPA previous concerns have been resolved, therefore EPA
has no objection to the proposed action.
ERP No. F-USA-L11022-WA Fort Lewis Military Installation
Comprehensive Solid Waste Management Program, Implementation, City of
DuPont, Pierce and Thurston Counties, WA.
Summary: EPA recommended that the Record of Decision provide more
information regarding the incinerator recycling rate and fly ash.
Dated: July 3, 1995.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities.
[FR Doc. 95-16772 Filed 7-6-95; 8:45 am]
BILLING CODE 6560-60-U