[Federal Register Volume 60, Number 46 (Thursday, March 9, 1995)]
[Notices]
[Pages 12967-12968]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-5694]
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
[CA-020-510-10-B039; CACA-31406, NVN-57250]
Notice of Availability of a Draft Environmental Impact Statement
AGENCY: Bureau of Land Management, Interior, Susanville District
Office, California.
ACTION: Notice of Availability of a Draft Impact Statement (DEIS).
-----------------------------------------------------------------------
SUMMARY: The Bureau of Land Management (BLM) and the California Public
Utilities Commission (CPUC) have prepared a draft Environmental Impact
Report/Statement (EIR/S) for the Alturas 345 Kilovolt (KV) transmission
line project proposed by Sierra Pacific Power Company (SPPCo) in BLM
application number CACA-31406. The draft EIR/S has been prepared to
satisfy the requirements of the National Environmental Policy Act and
the California Environmental Quality Act.
The BLM and CPUC believe, subject to public comment, the approval
of the proposed project, with appropriate mitigation measures, has the
potential to significantly impact the environment. The draft EIR/S
includes an evaluation of the proposed project. The draft
EIR/S assesses the environmental impacts of the approval, construction,
operation and maintenance of a 345KV overhead electric power
transmission line approximately 164 miles long, from the vicinity of
Alturas, California through Modoc, Lassen, and Sierra Counties,
California, through Washoe County, Nevada to the vicinity of Reno,
Nevada. The proposed project would affect Federal, State and private
lands. The proposed project also includes the construction of two new
electrical substations, one northwest of Alturas and one in Sierra
County, California, just west of Border Town, Nevada, and the expansion
of SPPCo's existing North Valley Road Substation.
The impact analysis in the draft
EIR/S includes the identification of feasible mitigation measures and
alternatives to the proposed project, which, if incorporated into the
Project, would avoid or minimize impacts.
The draft EIR/S has been placed in the public files of the CPUC and
the BLM, and is available for public inspection at:
California Public Utilities Commission, Central Files, 505 Van Ness
Avenue, San Francisco, CA 94102, (415) 703-2045
Bureau of Land Management, Susanville District Office, 705 Hall Street,
Susanville, CA 96130, (916) 257-5381
Copies of the DEIR/S are available for inspection at BLM offices in
Alturas and Susanville, California, in Carson City, Nevada, and
Washington, DC.; at the Modoc National Forest in Alturas and the
Toiyabe National Forest in Sparks, NV; at public libraries in Alturas,
Susanville and Reno, and at the City Hall in Loyalton. Copies have also
been sent to interested Federal, State and local agencies and
interested groups. An Executive Summary of the key issues and impacts
addressed in the EIR/S will be available upon request.
DATES AND ADDRESSES: Any person wishing to comment on the draft EIR/S
may do so. Comments should be filed as soon as possible, but must be
received no later than May 3, 1995. Written comments on the draft EIR/S
must reference CPUC Application No. 93-11-018 and BLM Application No.
CACA-31406. Comments on the draft EIR/S and request for the Executive
summary should be addressed to: Julie Halligan/Peter Humm, CPUC/BLM, c/
o Aspen Environmental Group, 30423 Canwood Street, Suite 218, Agoura
Hills, CA 91301.
In addition to asking for written comments, the public is invited
to attend any of the public workshops and hearings that will be held at
the times and locations listed below. The public workshops will be
informal and will serve to help affected communities understand the
project and the draft EIR/S and its findings.
The CPUC and BLM will hold public hearings near the end of the
public review period to receive oral comments on the draft EIR/S. The
hearings will be conducted before an Administrative Law Judge. A court
reporter will record each hearing so that any comments will be
accurately entered into the public record.
Locations and schedules for the workshops and hearings are:
[[Page 12968]]
----------------------------------------------------------------------------------------------------------------
Workshops Hearings
----------------------------------------------------------------------------------------------------------------
Alturas, CA, City Hall, 200 North Street.. Monday, 3/13/95, 6 p.m........... Monday, 4/17/95, 6 p.m.
Susanville, CA, Monticola Club, 140 S. Tuesday, 3/14/95, 6 p.m.......... Tuesday, 4/18/95, 6 p.m.
Lassen St.
Loyalton, CA, Loyalton High School, 700 Wednesday, 3/15/95, 6 p.m........ Wednesday, 4/19/95, 6 p.m.
Fourth Street.
Reno/Sparks, NV, Best Western, Airport Thursday, 3/16/95, 6 p.m......... Thursday, 4/20/95, 6 p.m.
Plaza Hotel, 1981 Terminal Way, Reno.
----------------------------------------------------------------------------------------------------------------
FOR FURTHER INFORMATION CONTACT: This Federal Notice of Availability of
Draft EIR/S is issued by the District Manager, Bureau of Land
Management, 705 Hall Street, Susanville, California 96130. For further
information write to the District Manager or call Peter Humm, BLM
Project Manager, at (916) 257-0456.
Dated: February 28, 1995.