[Federal Register Volume 59, Number 237 (Monday, December 12, 1994)]
[Unknown Section]
[Page 0]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-30426]
[[Page Unknown]]
[Federal Register: December 12, 1994]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. CP93-672-001]
Natural Gas Pipeline Co. of America; Notice of Amendment
December 6, 1994.
Take notice that on November 30, 1994, Natural Gas Pipeline Company
of America (Natural), 701 East 22nd Street, Lombard, Illinois, 60148,
filed to amend its application in Docket No. CP93-672-000 for
permission authorizing the abandonment of facilities constructed in the
1930's and 1960's, and partial replacement of these facilities, all as
more fully set forth in the request which is on file with the
Commission and open to public inspection.
Natural requested authorization in Docket No. CP93-672-000 for the
abandonment of approximately 490 miles of the original 24'' Amarillo
No. 1 mainline and one 12,000 HP engine at intermediate Compressor
Station 195 located in Washington County, Kansas. Natural also
requested the issuance of a Certificate of Public Convenience and
Necessity authorizing it to construct and operate: (1) Approximately
9.41 miles of 30'' loop and three separate segments of 36'' loop
totaling approximately 18.66 miles in Hutchinson County, Texas; Ford
County, Kansas; Lincoln County, Kansas; and Otoe County, Nebraska,
respectively, at an aggregate estimated cost of $19,020,000; and, (2)
one 14,500 HP compressor engine, by means of retrofitting one existing
12,000 HP engine to 14,500 HP, at Compressor Station 195 located in
Washington County, Kansas, at an estimated cost of $5,925,000. Natural
indicated that the abandonment and construction project was proposed to
increase the reliability of Natural's services and reduce operating
costs by eliminating or replacing parts of the system that are obsolete
and require high operation and maintenance costs.
In Docket No. CP93-672-001 Natural proposes to amend its
application in Docket No. CP93-672-000 to eliminate from that docket
the proposed abandonment and construction activity south of its Hooker
Lateral in Beaver County, Oklahoma. Natural states that it is now
requesting authorization to abandon approximately 308 miles of its 24-
inch diameter Amarillo No. 1 line and one compressor engine at its
Compressor Station 195 located in Washington County, Kansas. According
to Natural's application to amend, it is also requesting authorization
to construct and operate approximately 9.46 miles of 36-inch diameter
pipeline in Otoe County, Nebraska and one 14,500 horsepower compressor
engine, by means of retrofitting an existing engine, at its Compressor
Station 195. Natural estimates the total cost of the new construction
to be approximately $12,828,000.
Any person desiring to be heard or to make any protest with
reference to said application should on or before December 27, 1994,
file with the Federal Energy Regulatory Commission, Washington, D.C.
20426, a motion to intervene or a protest in accordance with the
requirements of the Commission's Rules of Practice and Procedure (18
CFR 385.214 or 385.211) and the Regulations under the Natural Gas Act
(18 CFR 157.10). All protests filed with the Commission will be
considered by it in determining the appropriate action to be taken but
will not serve to make the protestants parties to the proceeding. Any
person wishing to become a party to a proceeding or to participate as a
party in any hearing therein must file a motion to intervene in
accordance with the Commission's Rules.
Take further notice that, pursuant to the authority contained in
and subject to jurisdiction conferred upon the Federal Energy
Regulatory Commission by Sections 7 and 15 of the Natural Gas Act and
the Commission's Rules of Practice and Procedure, a hearing will be
held without further notice before the Commission or its designee on
this application if no motion to intervene is filed within the time
required herein, if the Commission on its own review of the matter
finds that a grant of the certificate and permission and approval for
the proposed abandonment are required by the public convenience and
necessity. If a motion for leave to intervene is timely filed, or if
the Commission on its own motion believes that a formal hearing is
required, further notice of such hearing will be duly given.
Under the procedure herein provided for, unless otherwise advised,
it will be unnecessary for Natural to appear or be represented at the
hearing.
Lois D. Cashell,
Secretary.
[FR Doc. 94-30426 Filed 12-9-94; 8:45 am]
BILLING CODE 6717-01-M