[Federal Register Volume 59, Number 160 (Friday, August 19, 1994)]
[Unknown Section]
[Page 0]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-20443]
[[Page Unknown]]
[Federal Register: August 19, 1994]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-4714-4]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared August 1, 1994 through August
5, 1994 pursuant to the Environmental Review Process (ERP), under
Section 309 of the Clean Air Act and Section 102(2)(C) of the National
Environmental Policy Act as amended. Requests for copies of EPA
comments can be directed to the Office of Federal Activities at (202)
260-5076.
An explanation of the ratings assigned to draft environmental
impact statements (EISs) was published in the FR dated April 8, 1994
(59 FR 16807).
Draft EISs
ERP No. D-AFS-L99004-AK Rating EC2, Exxon Valdez Oil Spill
Restoration Plan, Implementation, Prince William Sound, Gulf of Alaska,
AK.
Summary: EPA expressed environmental concerns based on the need to
ensure that the Trustee Council and individual agencies are cooperating
and coordinating each others management actions/objectives. EPA
expressed concerns over uncertainties of habitat protection tradeoffs
for each alternative. EPA recommended that the final EIS include
additional information on incorporating agency management actions into
the Restoration Plan and the difference of actual habitat protection
afforded by each alternative.
ERP No. D-BLM-K60027-CA Rating EC2, Southeast Regional Wastewater
Treatment Plant and Geysers Effluent Pipeline Injection Project,
Improvements, Funding, COE Section 404 Permit and NPDES Permit, City of
Clearlake, Lake County, CA.
Summary: EPA expressed environmental concerns regarding potential
project impact to water quality, water supply, wetlands, riparian
habitats, and fish and wildlife resources. EPA requested that these
issues be addressed in the final EIS.
ERP No. D-DOI-L39051-AK Rating LO, Institute of Marine Science
Infrastructure Improvement, Long-Term Research and Monitoring of the
Ecosystem affected by the Exxon Valdez Oil Spill, Funding, Seward, AK.
Summary: EPA had no objections to the proposed action, but made the
following suggestion: include a discussion on types of chemicals used
in research laboratories and disposal methodology.
ERP No. D-NPS-K61130-HI Rating LO, Haleakala National Park General
Management Plan and Conceptual Framework, Implementation, Island of
Maui, Maui County, HI.
Summary: EPA expressed a lack of objections with the proposed
action but requested that the final EIS assess potential project
impacts to water quality caused by nonpoint source runoff and note the
designated uses of water bodies in the project area under Hawaii water
quality regulations.
ERP No. D-USN-F11026-IN Rating EC2, Great Lakes Naval Training
Center Realignment of Naval Training Centers in Orlando, Florida; San
Diego, California; Treasure Island and Combat Systems Technical Schools
Command, Mare Island, California and Relocation of Commander Navy
Recruiting Command, Washington, DC, Implementation, Lake County, IN.
Summary: EPA expressed environmental concerns regarding alternative
sites.
Final EISs
ERP No. FA-COE-K32038-CA Oakland Outer and Inner Harbors, Deep
Draft Navigation Improvements, Updated Information, Alcatraz Dredge
Material Disposal Site Changed Conditions, Implementation, Alameda
County, CA.
Summary: Review of the final EIS was not deemed necessary. No
formal comment letter was sent to the preparing agency.
ERP No. FS-USN-L11013-WA US West Coast Homeporting Program for Fast
Combat Support Ships (AOE-6 Class), Updated Information concerning
Dredging and Dredge Disposal at Pier D Naval Shipyard Puget Sound for
the Berthing of (AOE-6 Class) Ships and Temporary Berthing of Deep-
Draft Vessels, Sinclair Inlet, Bremerton, WA.
Summary: EPA provided no formal written comments. EPA had no
objections to the preferred alternative as described in the final EIS.
Dated: August 16, 1994.
William D. Dickerson,
Deputy Director, Office of Federal Activities.
[FR Doc. 94-20443 Filed 8-18-94; 8:45 am]
BILLING CODE 6560-50-U