DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EG94-83-000, et al.]
EI Cayman, et al.; Electric Rate and Corporate Regulation Filings
July 19, 1994.
Take notice that the following filings have been made with the
Commission:
1. EI Cayman
[Docket No. EG94-83-000]
Take notice that on July 14, 1994, EI Cayman, a Cayman Islands
corporation (EI Cayman), c/o Energy Initiatives, Inc., One Upper Pond
Road, Parsippany, New Jersey 07054, filed with the Federal Energy
Regulatory Commission an application for determination of exempt
wholesale generator status pursuant to part 365 of the Commission's
regulations.
EI Cayman intends to acquire up to 30 percent (but not less than 5
percent) of the voting securities of a Colombian corporation that is
developing a gas-fired electric generating facility with a capacity of
up to 750 MW to be located in the City of Barranquilla, Department of
Atlantico, Republic of Colombia. All of the facility's electricity will
be sold at wholesale to Corporacion Electrica de la Costa Atlantic in
Colombia.
Comment date: August 1, 1994, in accordance with Standard Paragraph
E at the end of this notice. The Commission will limit its
consideration of comments to those that concern the adequacy or
accuracy of the application.
2. Tampa Electric Company
[Docket No. ER94-1196-000]
Take notice that on July 8, 1994, Tampa Electric Company (Tampa
Electric) supplemented its prior filing in this docket concerning its
agreements to provide qualifying facility transmission service for
Mulberry Phosphates, Inc. (Mulberry), Cargill Fertilizer, Inc.
(Cargill), and Auburndale Power Partners, Limited Partnership
(Auburndale).
Tampa Electric continues to propose an effective date of May 1,
1994, and therefore requests waiver of the Commission's notice
requirement.
Copies of the supplemental filing have been served on Mulberry,
Cargill, Auburndale, and the Florida Public Service Commission.
Comment date: August 2, 1994, in accordance with Standard Paragraph
E at the end of this notice.
3. Ashton Energy Corporation
[Docket No. ER94-1246-000]
Take notice that on June 28, 1994, Ashton Energy Corporation
tendered for filing additional information to its May 11, 1994, filing
in the above-referenced docket.
Comment date: August 2, 1994, in accordance with Standard Paragraph
E at the end of this notice.
4. R.J. Dahnke & Associates
[Docket No. ER94-1352-000]
Take notice that on July 12, 1994, R.J. Dahnke & Associates
tendered for filing an amendment to its June 13, 1994 filing in the
above-referenced docket.
Comment date: August 2, 1994, in accordance with Standard Paragraph
E at the end of this notice.
5. Wisconsin Electric Power Company
[Docket No. ER94-1443-000]
Take notice that on July 11, 1994, Wisconsin Electric Power Company
(Wisconsin Electric), tendered for filing an amendment to the
Interconnection Agreement between itself and Upper Peninsula Power
Company (UPPCO). The amendment replaces Appendices A and B thereof with
Appendix A (Modification 3) and Appendix B (Revision 2). The changes
involve the Cornell and Mass Interconnections which will now be
operated normally closed.
Wisconsin Electric requests an effective date of July 1, 1994.
Accordingly, the Company respectfully requests waiver of the sixty day
notice requirement in order to enhance reliability and economy of
operation.
Copies of the filing have been served on UPPCO, the Michigan Public
Service Commission, and the Public Service Commission of Wisconsin.
Comment date: August 2, 1994, in accordance with Standard Paragraph
E at the end of this notice.
6. Southwestern Public Service Company
[Docket No. ER94-1445-000]
Take notice that on July 8, 1994, Southwestern Public Service
Company (Southwestern) tendered for filing a Rate Schedule to be
included in its wholesale electric rate tariff. The rate schedule is a
contribution in aid of construction agreement between Southwestern and
Rita Blanca Electric Cooperative, Inc. (Rita Blanca). The agreement
provides for Rita Blanca to pay Southwestern a one time charge of $594
for the replacement of an existing structure with a taller structure
and attachment of certain facilities.
Southwestern has requested that the amendment become effective as
of the date service commences over the new facilities and has requested
a waiver pursuant to 18 CFR 35.11. The waiver request is supported by
the agreement of Rita Blanca.
Comment date: August 2, 1994, in accordance with Standard Paragraph
E at the end of this notice.
7. New England Power Pool
[Docket No. ER94-1446-000]
Take notice that on July 12, 1994, the New England Power Pool,
tendered for filing a signature page to the NEPOOL Agreement dated
September 1, 1971, as amended, signed by Milford Power Limited
Partnership, Milford Power Limited Partnership has its principal place
of business in Milford, Massachusetts. NEPOOL indicates that the New
England Power Pool Agreement has previously been filed with the
Commission as a rate schedule (designated NEPOOL FPC No. 1).
NEPOOL states that Milford Power Limited Partnership has joined the
over 90 other electric utilities that already participate in the pool.
NEPOOL further states that the filed signature page does not change the
NEPOOL Agreement in any manner, other than to make Milford Power
Limited Partnership a participate in the pool.
NEPOOL requests an effective date of August 1, 1994, for
commencement of participation in the power pool by Milford Power
Limited Partnership, and requests waiver of the Commission's customary
notice requirements to permit the membership of Milford Power Limited
Partnership to become effective on that date.
Comment date: August 2, 1994, in accordance with Standard Paragraph
E at the end of this notice.
8. Florida Power & Light Company
[Docket No. ER94-1447-000]
Take notice that on July 12, 1994, Florida Power & Light Company
(FPL) tendered for filing proposed Service Agreements with Enron Power
Marketing, Inc. for transmission service under FPL's Transmission
Tariff Nos. 2 and 3.
FPL requests that the proposed Service Agreements be permitted to
become effective on August 1, 1994, or as soon thereafter as
practicable.
FPL states that this filing is in accordance with 18 CFR Part 35 of
the Commission's regulations.
Comment date: August 2, 1994, in accordance with Standard Paragraph
E at the end of this notice.
9. Central Maine Power Company
[Docket No. ER94-1448-000]
Take notice that on July 6, 1994, Central Maine Power Company
tendered for filing a Contract Amendment Affecting the Rate Schedule in
Northeast Empire Limited Partnership #2 in Docket No. QF82-129-000.
Comment date: August 2, 1994, in accordance with Standard Paragraph
E at the end of this notice.
Standard Paragraphs
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 825 North Capitol Street, N.E., Washington, D.C.
20426, in accordance with Rules 211 and 214 of the Commission's Rules
of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protests should be filed on or before the comment date.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a motion to intervene. Copies of this filing are on file with the
Commission and are available for public inspection.
Lois D. Cashell,
Secretary.