[Federal Register Volume 59, Number 88 (Monday, May 9, 1994)]
[Unknown Section]
[Page 0]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-11037]


[[Page Unknown]]

[Federal Register: May 9, 1994]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission
[Docket No. ER94-1180-000, et al.]

 

Idaho Power Co., et al.; Electric Rate and Corporate Regulation 
Filings

May 2, 1994.
    Take notice that the following filings have been made with the 
Commission:

1. Idaho Power Co.

[Docket No. ER94-1180-000]

    Take notice that on April 25 1994, Idaho Power Company tendered for 
filing two agreements with the Bonneville Power Administration. The 
first is a modification which would extend the term of the Idaho Water 
Rental Pilot Project. The second is an offer of storage services by 
Bonneville Power. Idaho Power has requested an effective date for both 
agreements of not more than 60 days from the date of filing.
    Comment date: May 16, 1994, in accordance with Standard Paragraph E 
at the end of this notice.

2. Entergy Services, Inc.

[Docket No. ER94-1182-000]

    Take notice that Entergy Services, Inc. (Entergy Services), acting 
as agent for Louisiana Power & Light Company (LP&L), on April 26, 1994, 
tendered for filing a revised appendix B to the Electric System 
Interconnection Agreement Between Cajun Electric Power Cooperative, 
Inc. (Cajun) and LP&L, which provides for the identification of 
Delivery Points thereunder. Entergy Services requests waiver of the 
notice requirements of the Federal Power Act and the Commission's 
regulations to permit the revised appendix A to be made effective 
January 1, 1994.
    Comment date: May 16, 1994, in accordance with Standard Paragraph E 
at the end of this notice.

3. Entergy Services, Inc.

[Docket No. ER94-1183-000]

    Take notice that Entergy Services, Inc. (Entergy Services), acting 
as agent for Louisiana Power & Light Company (LP&L), on April 26, 1994, 
tendered for filing a revised appendix A to the Electric System 
Interconnection Agreement Between Louisiana Energy and Power Authority 
(LEPA) and LP&L, which provides for identification of Delivery Points 
thereunder. Entergy Services requests waiver of the notice requirements 
of the Federal Power Act and the Commission's regulations to permit the 
revised appendix A to be made effective January 1, 1994.
    Comment date: May 16, 1994, in accordance with Standard Paragraph E 
at the end of this notice.

4. Southwestern Public Service Co.

[Docket No. ER94-1184-000]

    Take notice that on Southwestern Public Service Company 
(Southwestern) on April 26, 1994, tendered for filing a proposed 
amendment to the Agreement for Wholesale Full Requirements Electric 
Power Service to Cap Rock Electric Power Service to Cap Rock Electric 
Cooperative, Inc. (Cap Rock).
    The amendment reflects an increase in the maximum commitment of the 
Vealmoor delivery point from 100,000 KVA to 115,000 KVA to accommodate 
Cap Rock's increased load requirements. No rate change is being 
proposed in the filing.
    Comment date: May 16, 1994, in accordance with Standard Paragraph E 
at the end of this notice.

5. PacifiCorp

[Docket No. ER94-1185-000]

    Take notice that PacifiCorp, on April 26, 1994, tendered for 
filing, the final draft of the AC Intertie Operation and Maintenance 
Agreement (O&M Agreement) between PacifiCorp and Bonneville Power 
Administration (Bonneville), Contract No. DE-MS79-93BP94278.
    The O&M Agreement provides for the operation and maintenance of 
jointly owned facilities which are part of the AC Intertie.
    PacifiCorp respectfully requests that the Commission grant a waiver 
of prior notice, and that an effective date of December 7, 1993 be 
assigned.
    Copies of this filing were supplied to the Public Utility 
Commission of Oregon.
    Comment date: May 16, 1994, in accordance with Standard Paragraph E 
at the end of this notice.

6. Louis Dreyfus Electric Power Inc.

[Docket No. ER92-850-003]

    Take notice that on April 25, 1994, Louis Dreyfus Electric Power, 
Inc. (Dreyfus) filed an amendment to its informational filing for the 
quarter ended March 31, 1994, containing certain information required 
by the Commission's December 2, 1992 letter order in this proceeding. 
61 FERC 61,303 (1992). Copies of Dreyfus' informational filing are on 
file with the Commission and are available for public inspection.

Standard Paragraphs

    E. Any person desiring to be heard or to protest said filing should 
file a motion to intervene or protest with the Federal Energy 
Regulatory Commission, 825 North Capitol Street, N.E., Washington, D.C. 
20426, in accordance with Rules 211 and 214 of the Commission's Rules 
of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
motions or protests should be filed on or before the comment date. 
Protests will be considered by the Commission in determining the 
appropriate action to be taken, but will not serve to make protestants 
parties to the proceeding. Any person wishing to become a party must 
file a motion to intervene. Copies of this filing are on file with the 
Commission and are available for public inspection.
Lois D. Cashell,
Secretary.
[FR Doc. 94-11037 Filed 5-6-94; 8:45 am]
BILLING CODE 6717-01-P