[From the U.S. Government Printing Office, www.gpo.gov]
REVIEW AND ANALYSIS OF.THE PROPOSED TRANS MOUNTAIN OIL PIPELINE TO BE CONSTRUCTED WITHIN SKAGIT CO. FOR SKAGIT COUNTY 9 1 -0 ............ ... W1.1 0-01A --- ------- .1st "I'l D-(PIA ............... K- .1 V@%)A 1 (11110 111 A-41 v'"w"A o Im-ols' ........... ............... ........ ... ......... AR.. .1. It RKA.SAS (;14NGIA .......... Al ARA@k ............... II(NIOA IN! By LEONARD AND. BOUDINOT, INC. CONSULTING ENGINEERS BURLINGTONI WASHINGTON APRIL 30, 1981' "The preparation of this report was aided through a grant from the Washington State Department of Ecology with funds obtained from the National Oceanic and Atmospheric Administration, and appropriated for Sec- tion 308(b) of the Coastal Zone Management Act of 1972". JOHN E. LEONARD, JR., P.E. & L.S. Jtxonard and Boudinot MOORPORATM ROBERT C. BOUDINOT, JR., P.E. PROFESSMAL ENGINEERSand LAND StJRVEYOFtS April 30, 1981 Mr. Robert C. Schofield Planning Director Skagit County Planning Department County Administration Building Mount Vernon, WA 98273 Reference.: Review and analysis of.that portion of the Trans Mountain Oil Pipeline to be constructed within Skagit County Dear Mr. Schofield: As per our agreement dated March 3, 1981, we submit herewith our report on that portion of the Trans Mountain Oil,Pipeline proposed to be con- structed in Skagit County. Our analysis of the documents submitted.by Trans Mountain Oil Pipeline, Corporation has been primarily from an engineer's perspective. We have raised questions which have not been sufficiently answered in the Trans Mountain documents and have attempted to identify those particular impacts relating to specific conditions in Skagit County. In the course of our review we met with private individuals, public agencies, and utility companies to elicit their impressions of the proposed oil pipe- line construction. Letters from various agencies and companies are included in the appendix of this report. We look forward to participating with Skagit County in future meetings and hearings concerning this project. Yours very truly, LEONARD D BOUDIN9, INC. /9Fn/r._ Le Jr., P 4. & ert"C. Boudinot, Jr., P.E. o@r @1 @r_ 2= P 9. 9&, 4' IN Jr., P.E. Post Office Box 327 612 East Fairhaven Burlington, Washington 98233 Telephone 755-0431 INTRODUCTION The following report is based on our.review of all documents, maps, and exhibits submitted by the.Trans Mountain Oil'Pipeline Corporation. Our study has included interviews with Dike and Drainage District Com- missioriers, City and County officials, official-s of the U.S.D.A. Soil Conservation Service, officials of the State Department of Ecology,, and owners,of private property through which the pipeline will pass. We have met with Mr. Trevor Durrant, Managerof Administration and Planning, of the Trans Mountain Oil Pipeline Corporation. We have also conducted a field reconnaissance of the entire proposed pipeline route in Skagit County. In presenting our observati ons, questions, and concerns, we realize that the information submitted by Trans Mountain does not contaig a detailed final pipeline.design. Additional engineering studies and a final design must be submitted and will be reviewed by Skagit County officials. Many of our questions and concerns should be answered in the final plans. MAJOR CONCERNS Of the many impacts on Skagit County,-we feel there are six major concerns of which the county should be aware: Oil Spill The first and most pervasive concern is the threat of an oil spill from' rupture of the pipeline or leakage at the Burlington tank farm. The environmental impacts associated'with an oil spill have been addressed in considerable detail in the six volumes of the Trans Mountain Oil Pipe- line Corporation report. We are concerned that adequate analysis of the physical conditions of the environment through which the pipeline passes has not been made. We feel that more precise engineering information concerning soil conditions, ground*water table conditions, fault lines, river and stream conditions, and pipeline right@-of-way conflicts is neces- sary to adequately evaluate the structural integrity of the pipeline and tank farm components.. We have some concerns about the remote computer operation of the Burlington tank farm (Volume II, Part 1, Page 2-121) and the lack of full-time.personnel at the Burlington tank farm. We are concerned with the potential liquefaction of the fine grained soils in the Skagit lowlands due to earthquakes and the resultant loss of support for the pipeline. We .need muc.h more information on the direc@ tional drilling technique proposed for the Skagit River crossing and an examination of alternative construction te-chniques for the Skagit River crossing. We realize that the Corps of Engineers, Department of Ecology, Department of Fisheries, and Environmental-.: Protection Agency will all be reviewing this pipeline proposal and wi*ll be evaluating the oil spill risks. For this reason a detailed study of oil spill impacts in Skagit County is not a part of.this report. River Crossings A list of major river and stream crossings is given in Volume II, 2 Part 1, Page 2-47. Nine crossings are listed for Skagit County: Milepost Stream Name 95 Carpenter Creek (Fisher Slough) 100 Britt Sl-ough 101.4 Skagit River 104.1 School House Slough 105.4 Heggens Slough Indian Slough 111.3 Samfsh.River 118.1 Friday Creek 118.7 Friday Creek@,'., In the appendix of this report photographs P-1, P-2 and P-3 show the pipeline crossing location on Carpenter Creek (Fisher Slough) and photographs P-9 and P-10 show the Skagit River crossing,location. Our greatest concern is with the Skagit River pipeline crossing. The Trans Mountain report indicates that this crossing will be made using a directional drilling technique. This is briefly described in Volume II, Part 2, Page 4-12. No alternative construction methods for this crossing are discussed in the report and no alternative river crossing sites are investigated. A copy of the plan and profile of the Skagit River crossing is included on Page A-3 in the appendix of this report. This drawing is a revision of the drawing shown in Volume III, Part 1, Page A-81 of the Trans Mountain report. The geophysical* survey of the Skagit River crossing was made in December 1979 by Harding-Lawson Associates. Results of their investiga- tion are in Volume III, Part 1, Section A, Page A-196. Their report indicates that the river was flooding at the time of the investigation and that they had difficulty obtaining.sufficient information on soil conditions below the river bed. Mr. Trevor Durrant indicated that additional soils information from soil borings has subsequently been obtained but is not included in the report. From the results of the preliminary geophysical investigations-the report concludes that soils are sufficiently dense to allow for construction of the river crossing using the directional drilling technique. We have the following concerns: 3 1. As shown on Page A-3 of the appendix of this report, it is proposed to directionally drill 1,450 lineal feet or approxi- mately the distance between t he river dikes. Letters from Dike District Nos.,l and 3 are.included on Pages A-8 and A-9 of the appendix; and photograph P-7 shows the dike south of the river. The Dike District Commissioners.are concerned that the pipeline will not be deep enou'gh under the dikes and that the boring will take,place too close to the toe of the dikes. Photograph P-8 shows the area adjacent to the south dike where it is assumed that the drilling will take place. 2. The Trans Mountain report makes no mention of seepag e barriers or@ trench cut off wa'lls in the pipeline under the dikes., Both Dike Districts -request some kind of baffle plates around the pipe or seepage barriers. 3. Insufficient information concerning the directional drilling technique has been presented in the Trans Mountain report. It is, therefore, difficult to-address possible concerns. The depth of the pipeline below the river bottom appears to be sufficient but we question the ability to control the diameter of the hole being drilled and are concerned with voids being created along the pipeline route. 4. We are concerned that the soils conditions under the river may preclude thedirectional drilling method. We have inspected well logs for wells adjacent to the river in the vicinity of the pipeline crossing, and have spoken with local well drillers and with Dike and' Drainage District Commissioners. There is the possibility of encountering areas of saturated silty fine sands or quicksand. A complete soils investigation should be presented to Skagit County for revi ew 5. Due.to the concerns of the Dike Districts and the information from well logs, we.think tho.possibility.exists that directional drilling may have to be abandoned and either open cut the river crossing or mining may have to be resorted [email protected] impacts and 4 mitigative measures of,the alternate methods of crossing should be studied.. The oil pipeline is proposed to be constructed four feet below the maximum scour depth on all other rivers and streams (Ref. Volume II, Part 1, Section 7, Page 7-10). No information is given on how the maxi- MUM scour depth will be determined or on design flood flows on each river and stream. Mitigative measures for stream crossings are dis- cussed in Volume II, Part 1, Section 7.1.3.3. We wish to note that some of these same mitigative measures should be applied to drainage district ditches crossed by the pipeline. The report points out.that some rivers such as the Samish will be resistant to constructi on impacts because of their normally-high turbidity levels. It is hoped that this will not allow less stringent controls on constr'uction across the Samish River. Plan, profile, and details of the,Samish River crossing are shown on Page A-4 in the appendix of this report. Burlington Tank Farm The Burlington tank farm and pumping station is to be constructed on 36 acres of land south of the Skagit Regional Airport. Access to the site will be by Ovenell Road and possibly by a new access road to the airport proposed to be constructed east of the tank farm site. A complete report on the tank farm and pump station i.s included in Volume III, Part 3, Sec- @tion N. Our concerns with the Burlington tank farm can.be grouped in two categories: Impacts of construction and impacts during operation. Construction-Impacts: The Trans Mountain report (Volume III, Part 3, Section 0, Pages 0-9 and 0-10) indicate that the Burlington tank farm will act as a staging area for the pipeline construction from West Pass (milepost 89) north to the'tank farm. Pipe will be barged to Anacortes, and then trucked to the Burlington tank farm for storage. A total of 46 miles of pipe will be stored at the Burlington site and then trucked from the site to the pi.pe' laying crews. 5 Little information is given in the report on the impacts or pro- cedures for storing pipe, materials, and equipment at the Burling- ton tank farm site. We are concerned with the impact of truck traffic on Highway.20, Highway 537 (Farm-to-Market.Road), and t.he Ovenell Road. The intersection of Highway 537 and Ovenell Road is just over the crest of a hill',on . Highway 53.7 which bl,ocks sight of the intersection.. This.creates a particular hazard with turning trucks. Ovenell Road is surfaced with gravel and crushed rock and is not constructed to handle heavy truck traffic. Photograph P-12 in the appendix of this report shows Ovenell Road. Further analysis of access problems to the tank farm site is needed. Adverse impacts on transportation facilities is discussed in Volume II, Part 1, Sec- tion 7, Page 7-28, but no mention ismade under mitigative measures of any road improvements necessitated by the pipeline construction. We do not agree with the traffic analysis conclusions that there does not appear to be any significant project related impacts at this site. (Ref. Volume III, Part 2, Section K and Volume II, Part 2, Page 4-174) The report indicates that.approximately 400 construction workers will be working out of the Burlington tank farm site (Ref. Volume III, Part 3, Section 0, Page 0-10)-. It also states' that a total of 239 construction workers from outside the area are expected to be in Skagit County in the twenty-second and twenty-third months of the construction (Ref. Volume II, Part 2, Page 4-134). There is insufficient analysis of the.impact of these construction workers on the tank farm site. -Impacts of the Completed Tank Farm and Pumping Station: When com- pleted and in operation, the Burlington tank f arm and pumping station will be operated by computers located in Vancouver, B.C. and at Low Point. Control of all pumps and valves will be remote and sensors will transmit data back to the computers through a communications system (Ref. Volume II, Part 1, Page 2-122). Three operations personnel and three maintenance personnel would be sta- tioned at the Burlington tank farm. 6 We have the following concerns:, 1. It is a concern that an operation ascomplex, expensive, and potentially devastating to the environment has no onsite per- sonnel at the Burlington tank farm durin'g periods when the tanks are being filled or emptied.@ Will the pipeline operators in Vancouver and Low Point be able to contact emergency services personnel if their computer system indicates an emergency at the Burlington tank farm or pumping station? How will security be handled at the tank farm site? 2. The report indicates that the entire tank farm and pump station site will be diked and will be covered with an impervious blanket to prevent seepage into the soils. Storm water runoff will be controlled on the entire site and will be discharged at the south- east corner of the site into Drainage District No. 19 ditches. Insufficient information has been given in.the report concerning runoff quantity and quality. It is understood that oil@water separators will be.used, but how will these be operated and what controls will there be on the quality of discharged storm water? Retention of peak runoff will be required by the county, as will control of runoff during construction. 3. A buffer of-trees surrounding the tank farm and pumping station is mentioned in the report (Ref.-Volume II, Part 2, Pages 4-125 and 4-233). This.buffer wilVielp.to contain the glare of the site lighting. No buffer of trees is shown on the tank farm plan in.Volume III, Part-3, Section N, Page N-7. Photograph P-11 in the appendix of this report shows the east boundary of the proposed tank farm site. Is the proposed vegetative buffer to be on the 36 acres of Trans Mountain property? Will light and glare from the tank farm site have any effect on the opera- tion of the Skagit Regional Airport? Volume II, Part 2, Section 3, Page 3-324 describes.th6 Skagit Regional Airport at Bayview. A discussion of the visual impact of the Burlington tank farm is given in Volume II, Part 1, Page 4-228. 7 Depth of Burial of Oil Pipeline. Typical pipeline trench and backfill.requirements are shown in the Trans Mountain report in Fi gure 2-40 in Volume II, Part 1, Section 2, Page 2-109. This diagram indicates that trench depths will vary from a maximum of 48 inches to a minimum of 30 inches. Because of the large diameter of the proposed pipe, the.pipeline route will create a barrierfor drainage and other utilities from.the south border to the north border of the county. In interviews with local utility companies, city and county officials, farmers, and private property owners, con- siderable conflict with existing oil pipelines due to their shallow .depth of burial has been indicated. A minimum of 48 inches of cover over the proposed pipO'ine should be required. In addition, the final pipeline design should be evaluated for potential conflicts with future utility extensions in Skagit County.. More information-is needed to properly evaluate the maximum scour depth at rivers and streams. At most major drainag e ditches a burial depth of 4 feet below the bottom of the ditch should be adequate to prevent future obstruction of ditch'cleaning. The proposed 30-inch burial depth for the pipeline across agricultural lands is too shallow to allow for the construction of adequate drains and for modern day agricultural practices.. Easements The first five'miles of the proposed p ipeline route through Skagit County will require new right-of-way easements (Ref. Volume I, Page 2-77). We are,concerned that in the process of negotiation for these easements the pipeline route may be changed and other impacts will need to be inves- tigated. A recommendation has been made by Dike.District No. 3 that the pipe- line be routed next'to the Burlington Northern Railroad in the south part of Skagit County. Questions have been asked why the Trans Mountain oil pipeline is not following the 01-ympi.d Pipeli,ne right-of-way. In the Burlington to Laurel segment of the pipeline an additional construction easement 30 feet wide will be necessary. The existing 8 right-of-way through most portions of this.segment is 50 feet wide. South of the Stackpole Road a 50-foot wide permanent easement and a 20-foot wide temporary construction easement will be required (Reif. Volume II, Part 1, Page 2-101). In segments where there is the existing 20-inch oil pipeline the new 36-inch pipe is proposed to be located 10 feet away from the existing pipe and approximately @O feet from the edge of the 50-foot easement (Ref. Volume II, Part 1, Page 2-103). We have obtained a few copies of the existing Trans Mountain ease- ments and noted that not all easement.,agreem ents-allow for the,construc- tion of a second pipeline. Construction Inspection and Plan Review During our interviews City and County Pu blic Works Departments, Drainage Districts, Dike.Districts, utility companies ., and private prop- erty owners have all expressed a concern for protection of their inter- ests during the construction. We recommend that a qualified consultant be appointed by the county to represent the concerns of the county and of all special districts crossed by the pipeline. This individual or firm should have authority to stop the. construction, and should be in direct contact with the top officials of the Trans Mountain Oil Pipe- line Corporation. The cost of this construction inspection, should be borne by the Trans Mountain Oil Pipeline Co rporation. Many of the people interviewed in Skagit County'related stories of other pipelines which have crossed the county and the relationships they have had with the contractors,doing the construction. Due to the pressure of keeping the job moving, many contractors are.insensitive to local property owners' concerns. Local property, owners and city, county, and district officials have been frustrated in the past at not having.a person to contact to express their individual concerns about the construc- tion. 9 CONCERNS Ground Water We anticipate that construction of the pipeline through the low areas of Skagit County will be in areas where the ground water table is' encountered. On the pipeline route map in the appendix, areas with a probable shallow ground'water table have bee In shaded. Impacts on ground water table condi tions could be substantial and need to be discussed in greater detail. Concerns: Soils in the upland areas of Skagit Co-unty are generally impervious clays or glacial till. Ground water will tend to follow the pipeline trench and may cause drainage problems in agricultural lands in the transition zone between flat and uphill pipe segments. Seepage along the pipeline trench should be controlled and trench cut off walls surround- ing the pipe should be used. Where the ground water' table is high some form of trench dewatering may have to be used. This lowering of the ground water table may cause settling of adjacent lands, may impact adjacent crop land, may lead to increased turbidity in local drainage ways, may affect wells in the vicin- ity, and may cause contamination of surface waters due to the intrusion of septic tank wastes into the dewatering areas., (Ref. Vol.ume II, Part 1, Pages 1 through 8; Volume II, Part 1 Section 7, Page 7-15) In the Trans Mountain report, Volume II, Part 1, Pages 3-23i, 3-23j and 3-23k, areas of shallow ground water in Skagit County are shown. No indication is made of shallow ground water in the southern segments of the pipeline. In Volume II, Part 1, Pages 3-125, 3-135 and 3-136, there is a list of 24 well.s in-Skagit County a long the proposed pipeline route and maps showing the location of these wells@ A discussion of ground water in the Skagit River basin is presented on Pages 3-144, 3-145 and 3-146. An oil spill could ha ve a tremendous impact on the ground water table 10 and on the permeable soils through which the ground water passes. Oil spills might occur not only fromthe pipeline, but also from the con- struction equipment. Potential ground watercontamination in Skagit County is discussed in.Volume II, Part 1, Page 4-77 and on Pages 4-301 and 4-304. Mention is made of. lining the pipe trench with bentonite clay or polyethylene-sheets to prevent the downward.and lateral migration of spilled or leaked oil. '(Ref.; Volume.11, Part 1, Section 7, Page 7-15) Residential and Public Areas In traversing Skagit County. the pipeline passes through some resi- dential areas and very close to the All en Elementary School. (See pic- ture P-14 in the appendix of this report.) There is little or no dis-_ cussion in the report of the impacts of the construction on'these areas or of any potential hazards. The majority of the residential neighbor- hoods are from milepost 102 to milepost 104, as shown on map plates 1 and 2 in the appendix of this report.. Concerns': The impact of constructing the oil pipeline through residential areas needs to be carefully examined. In addition to the noise, dust, and hazards of heavy equipment, there may be more far reaching consequences of const ruction close to buildings. The impact of the trench excavation on existing septic system absorption fields should be addressed. The potential damage to structures due to.vibra- tions from heavy equipment or settlement due to trench-dewater'ing is not mentioned. There is insufficient information concerning restoration of ground surfaces after the pipeline is constructed. Construction schedules given in the report'indicate that pipeline construction past the Allen Elementary School may occur during months when school is in session. Disruption of the school should be considered as well as potential hazards to the school children. No mention is made of,measures during construction to limit access to private property during periods when the pipe laying crew is passing through. Odors The Burlington tank farm will be a source of odors. The primary. source of odors from the tank farm will be volatile sulfur bearing con- stituents of crude oil mainly composed of hydrogen sulfide and mercaptans. The report states that,impacts of odors are not expected to extend beyond about-1 or 2 kilometers from the source, but.that odors should not be detectable beyond a few hundred meters from the source. Report Reference: Volume II, Part 1,-Section 4, Pages 66 and 67. Concerns: Portions of the Skagit Golf,and Country Club residential subdivision are located within 1.8 kilometers.of the proposed tank farm, as is the terminal area of the Skagit Regional Airport. Electric Power Power from Puget Sound Power and Light Company will be required to operate the Burlington and Laurel pumping stations., the cathodic protec- tion systems for the pipeline, the communications.systems, and the tank farm support facilities.. The report indicates th at Puget Sound Power and Light Company has approved these power system additions and has stated that providing power is not a problem. Report Reference: Volume II, Part'l, Section 4.2.6.1.1, Page 4-193 and Page 4-198 (table of electrical energy requirements). Concerns: Once in operation the trans Mountain oil pipeline will be a priority user of electric power. In the event of power shortages due to low water levels in the reservoirs, will Trans Mountain power require- ments cause or futher aggravate power shortages to existing commercial and residential customers? Is it possible that this could increase power rates? On Page 4-194 it states that a 1-,I-m'ile extension of 115 KV transmission line will be required to serve the Bur lington pumpin g station. This trans- mission line extension is proposed to be built along existing pipeline right-of-way. In checking pipeli ne easements in Skagit County, we have not found that they allow construction of power transmission lines. If this is the case, new easements would.have to be negotiated. Much of the 12 pipeline right-of-way crosses ag ricultural land, which may be impacted by location of a power'transmission line. Waste Disposal for Tank Farm The Burlington pumping stat.ion and tank farm will have a permanent work force of.approximately six. Sanitary waste will be disposed.of with a septic tank system. During construction several hundred construction workers will work out of the Burlington tank farm site. Holding tanks and portable toilets will be-used durin.g the construction. Report Reference:. Volume II, Part 1, Section 4, Page 4-207; Volume II, Part 1, 'Section 3, Page 3-.357. concerns: Septic tank Andabsorption field systems may be difficult to install at the Burlington ta.nk farm site due to impermeable soils and high ground water table conditions. It should be noted that the city of Burlington sanitary sewers exist approximately,3,000 feet to the east along the Ovenell Road from the proposed tank farm.- Drainage District and Dike District*Concerns The proposed pipeline route through Skagit County crosses fourteen major drainage ditches in four drainage districts and four major dikes in two dike districts. Commissioners' of-the drainage and dike districts were interviewed'and letters from.Dike District Nos..l and 3 are'included in the appendix of this report. Photographs P-1 an d P-7 show Dike District No. 3 dikes, and photographs P-2, P-3, P-4, P-5 and P-6 show Drainage Dis- trict No.' 17 ditches. Photograph P-13 shows a Drainage District.No. 14 ditch. All photographs 'are included in the appendix of this report. The drainage district commissioners indicated that a minimum burial of 4 feet below the bottom of their ditches would be sufficient for the pipeline in most cases. It was pointed out that maintenance of Fisher Slough (pipe milepost 95.1) is done with a drag line and a greater depth for this pipeline crossing may be necessary. .:Drainage district commissionert-were concerned that construction of the pipeline would not impede or.block the flow in the ditches and that 13 .when completed, the ditches would be put',back in-the same condition. Several of the drainage districts operate and [email protected] buried drains across agricultural property.. The, proposed minimum.depth of burial of 30 inches for the pipeline will obstruct these drains'and will cause considerable'obstruction to future field drain construction. The pipeline should be buried a minimum of 48 inches across all agricultural lands. Any field drains 'or tile .lines crossed'by the pipeline shall be repaired adequately and shall be protected against settlement of the pipe trench soils. If it is necessary to lower the ground water table by some form of trench dewatering, ground water discharged.into the drainage district ditches shall not contain sand or silt; sha-11 not contain effluents from septic systems; and shall not c.ause erosion along the drainage ditches (Ref. Volume II,. Part 1,.Section 7 and Volume 11, Part.1, Pages 4-10 and 4-81)., Dike and drainage districts,will require that construction through their facilities shall.be done in the period from June 15 through October 15. This is the dry period when the ground water table is the lowest and when flooding is least likely. Several-commissioners interviewed pointed out that soils along the proposed route.tend to behave as quicksand when excavating below the ground water tabl e. Particularly in the Fisher Slough area this could pose some difficult construction problems. Utilities and Roads In our interviews for this report we met with the.,Skagit Utility Coordinating Council an d city, county, and utility company officials. The principal concern expressed by all.persons interviewed was the proposed-depth of burial of the pipeline. Thirty inches cover over the pipe is not enough clearance-for construction of other utilities. Most utilities are.required'by their franchise to have a minimum burial of 30 inches. This puts them in direct.conflict with the proposed pipeline for any future utility extensions. Other concerns were for electrolysis of metallic pi.pelines and for Ioss of stability caused by trench de'watering or excavation close to 14 existing underground utility lines. City and county officials should be contacted by Trans Mountain prior to final design of the pipeline to determine requirements for road crossings. Agri cultural Land Our review of the pipeline route through the Skagit Valley Delta farmlands reveals that approximately 14b acres of pri.me farmland will be disturbed during the construction period. We have discussed the possible effects of this route with Peggy Olds of the Soil Conservation Service, with farmers at our meetings with various*dike and drainage districts, and also with other farmers who owned property when the Trans Mountain pipeline was put in from Canada to the refineries at March Point. We think that past experience has shown that there is crop loss extending as long as five years. Existing easements which Trans Mountain has at this time require the compensation for only the.immediato crop disturbed during the construction period * The only thing that can be done for farmers with existing easements across their property is to bring whatever pressure is available by the county to encourage Trans Mountain to mitigate the possible long term impacts.. Past experience has noted substantial disregard for the season of con.struction or the destruction done during that period. Once the pipeline contracts have been let, it will be hard for Trans Mountain to.control the timing of the construction, but possibly.contracts could be structured to permit construction only from June through September. One drawback for the pipeline company would be of course the greater crop loss during the summertime than during the wintertime;, howev 'er,' the destruction to the fragile topsoil would be considerably less if done during the summer. Another major existing problem and future problem is the disruption of field drains which will be frequently encountered within the entire sixteen miles of lowlands traversed.- The Soil Conservation Service has much of the information on the lo-catfon of existing tile field drains. Many of these systems were.installed with federal cost sharing funds, which committed the owners to mai ntain the drains. for a minimum of ten 15 years or pay back the federal'money used for,their project. One, of the major problems is the-depth of the existing pipeline with a 30-inch cover, which is nearly.exactly' where most field drains are installed. The new proposed pipe should be-installed at a depth which will allow field drains above it. Certainly a 40-inch pipe prohibits any field drains being installed below the bottom elevation of that pipe. A typical planand profile of field-drai.ns and how the pipeline would affect them are shown on Page A-5 in the appendix of this report. There should also be given consideration to the method of notifica- tion of the property owners when the construction actually begins. One of the previous problems in this regard was the lack of notification to lease holders of property who first discovered the fact that their crop was going to be removed when the construction crew appeared on the site. That-cannot be simply answered with the statement that Trans Mountain@.: will pay for crops removed. There is much-more impact on the farTner than just the loss of a 75-foot strip of corn or peas. Since the construc- tion may occur at aboutthe same time they-have field work to perform, a 75-foot swath interfering with-their operation can.be costly in ways which are not easily determined and probably not compensable. In summary, consideration should be given to disruption of field drain tiles, a change in the drainage characteristics of the soil due to heavy construction machinery, loss of fertility, unexpected disrup- tion of lease hold farmers, and the possible'large accumulative cost to the farm community in legal negotiations regarding losses that will occur. Restoration and Cleanup After construction of the pipe.line, restoration and cleanup of the pipeline right-of-way will be necessary. Report'Reference: Volume.II, Part 1, Pages 2-90, 2-107 and 2-11.7; Volume II, Part 2, Page 7-3. Concerns:. Very little mention is made of the restoration procedures '16 cleanup activities, that will be,implemented after-the-construction. In some places it will'be necessary to construct temporary rIoads across private properties along the pipe right-of-way.' Removal of these roads and restoration of the.ground surface needt.to be addressed'. Several property owners interviewed for this report have expressed concerns about the right-of-way cleanup. In discussion.of:.,@agricoltural.-.Iands..in the trans Mountain report it is mentioned that double ditching will be used to avoid mixing topsoil with sub soils. It is not mentioned, however, if topsoil will be removed and stockpiled from areas where roads will be built. Topsoils can.be damaged and lose their fertility due to rutting and compaction caused by heavy.equipment. Mention is made.in Volume II,-Part 2,- Page 7-3 of drainage and erosion control in the pipeline.right-of-way after construction. It is.stated that temporary mulching and planting will, be used during construction and permanent revegetation will be established after construction is complete. No information is given on the types of revegetation, how soon after construction revegetation will take place, or how long revege" tation will be maintained to assure.that it is.growing. 17 QUESTIONS l.-How much.Alaska North Slope oil is anticipated to be exchanged for Canadian crude oil along the Canadian pipeline r6ute? 2. Can Canadian crude'be shipped back to North Puget Sound refineries after new pipeline js completed? 3. The Burlington tank farm will provide storage for crude oilfor all. four refineries in the North Puget-Sound area. Does Trans Mountain 'have commitments from any of these refineries for supplying them,with crude oil? If commitments arenot obtained,.will the Burlington tank jarm be built? Aie.commitments.from the North Puget Sound refineries critical to the feasi bility of the.Trans Mountain proposal? (Ref. Volume I I, Part 1, Page 2-16) '.'@`4.',After the pipeline it in operation, what will be the origin of oily water,drained from the storage'tanks at the Burlington tank farm? What is the estimated quantity of oily water draine@ at the Burlington tank farm? (Ref. Volume II, Part 1, Page 2-70) A 2,000,000-gallon.reservoir for fire fighting water is proposed at the Burlington tank farm. Where will the water be obtained to fill this reservoir? If a well or wells are drilled to serve the tank farm, how much water must be obtained to satisfy potable water require- ments and to replenish the fire water reservoir? (Ref. Volume II, Part 1, Page 2-76) 6. Will laboratory testing facilities be provided-at the Burlington -tank farm for checking the.treated wastewater before discharge into Drainage District No. 19 ditches? What monitoring and control will there be of treated,runoff from the tank'farm site?. 7. Will the Burlington t .ank farm'be manned 24 hours a da. y, and what spe- cial security precauti.ons (other than fencing) will be taken at the Burlington tank farm? 18 Will there be any explosives or sources-of radiation at the Burling- ton tank farm during the pump station, tank farm, or p.ipeline con-. struction? (Ref...,VolumeI Page 3-3) 9. Corrosion, protection"for-the oil pipeline-will be facilitated by using ground beds for the cathodic protection system. Where will 'these ground beds be positioned along the pipeline in Skagit County, and what impact will., they have on the'surrounding land uses? (Ref. Volume II, Part 1 Page 2-79) 10. The Trans. Mountain -Oil Pipeline Corporation does not have right-of- way south of the Stackpole Road.in Skagit County. Have there been any negotiations with property owners in,this'area for acquiring right-of-way easements? Have'there been.any negot iations for acquir- ing construction easements along the-entire,pipeline through Skagit County? -11. What flood volume is go Iing to be used'in designing the Skagit River crossing? The 100-year flood volume used by the.Corps of Engineers is 230,000 cubic feet.per second. OBSERVATIONS The first five miles of the proposed pipeline route through Skagit County will require new right -of-way easements (from south county line to Stackpole Road). In Volume I, Page 2-80a, the Trans Mountain.report states that.-the pipeline does not.pass through any-.of the city of Mount Vernon. Recently annexed acreage to the south,of.the city takes in a portion of the proposed pipeline route. The,city of Burlington land use map shown as Figure 2-34e in Volume I does not show the correct city limits. The existing Trans Mountain pumping station wi.11 be dismantled and relocated at the new pump station site.'@. 5. Major stream, crossings in Skagit County'are listed in Volume II, Part. .1, Page 2-47. There are two unnamed crossings. These crossings are. School House Slough and Heggens Slough. 6. Major utility pipe''crossings in Skagit County are listed in Volume 11, Part 1, Page 2-49. Two natural gas pipelines and one oil products line arellisted, but the 36-inch and 24-inch city of Anacortes water mains along Bennett Road at pipeline milepost 104.1 are not mentioned. These pipelines are.shown in Section A-7 of the appendix,of this report. 7. The fire protection system for the tank f arm is discussed in Volume 11, Part 1, Page 2-75. 8. Wells will be developed for providing the fresh water requirements at the Burlington tank farm. (Ref. Volume II, Part 1, Page 2-76) 9. Measures will be taken to protect other metallic pipelines crossed by the proposed Trans Mountain pipeline. (Ref. Volume II, Part 1, Page 2-79) 20 .10. The pipeline route'.through.the Skagit lowlan'ds passes through what A map showing arche- are considered archeologically sensitive areas. olog,ically sensitive areas.is.shown in Volume II, Part 2, Section 3, Page 3-399. 1.1. All water used to@hydrostatically test the pipeline and oil storage tanks will be treated and disposed of in Canada. (Ref. Volume II., Part 2, Page 4-71) 12.'The report indicates-that major road cross'i.ngs'and railroad crossings will be bored and cased with a steel pipe larger than the diameter of the oil pipeline., S.ec..ondary roads will, be bored or open cut and the oil pipelineinstalled without a casing. ..(Ref. Volume II, Part 1, Pages 2-110 and 2-111). 13. A geologic map of.Washin'gton showing fault lines in Skagit Valley is shown in Volume II, Part 1, Page 3-10. 'Earthquakes in the Skag.,it Valley area are.discussed on Pages,3-41 and 3-42. 1@4. The pipeline route in the southern part of the county passes very c1ose to the Skagit River Delta bird and wildlife sanctuaries. 15. In Volume II, Part 1, Page 3-155 is a table showing discharge data for major stream crossings. The Skagit River is s hown to have a maximum discharge of 144,000 cubic, feet per second in the period from 1940 to 1977. 16. It is estimated that 456 pounds of oi,l products per day will be lost by evaporation from tanks, valves, seals, and pipeline equipment at the-Burlington tank farm (Ref. Volume II, Part 1, Pages 4-33, 4-34 and 4-35). These emissions are compared with a net reduction in emissions due to fewer oil tankers calling at the March Point refin- eries. 17. The report indicates that the.Friday Creek pipeline crossings will probably aggravate existing water quality problems, which include low summer flows, high water temperatures, and siltation. (Ref. Volume II, Part I-, Page 4-85), 21 .18. Volume II, Part 1, Page.4-149 has a table showing peak construction employment in Skagit County.at 399 workers. Of this, 104 will be non local workers and 295 will be local workers. .19. Volume H, Part 1, Page 4-157 has a table showing estimated sales tax revenue.from construction. Skagit-County is estimated to receive $141,000 in sales tax revenues. 20. Volume II, Part 1, Page 41-1.56 has'a table showing the estimated annual property tax liability of the Trans Mountain project. It is shown that Skagit County would receive approximately $4 million annually based on 1979 average taxes. Volume II, Part 1, Page 4-292 has a map showing potential structural damage from a Burlington storage tank explosion.. It indicates that general light structural damage could occur.within 2,200 feet of the tank farm. This would include. portions,of SR-20 as well as a sUbstan- tial portion of the Skagit'Regional Airport. 22: APPENDIX A-1 W. Beck and Associates Report A-2 Pipeline Route Maps A-3 Plan and Profile of Proposed Skagit River Pipe Crossing A-4 Plan and Profile of Proposed Samish River Pipe Crossing A-5 Typical Field Tile Drains Plan and Profile A-6 Skagit County Public Works Department Letter A-7 City of Anacortes Letter A-7a City.of Mount.Vernon Letter A-8 Dike District No. 1 Letter A-9 Dike District No. 3 Letter A-10 Continental Telephone of the Northwest Letter A-11 Photographs A-12 References and Interviews R. W BECK AN DAsSOCIATES ENGINEERS AND CONSULTANTS PLANNING GENERAL OFFICE DESIGN TOWER BUILDING SEATTLE, WASHINGTON RATES 7TH AVENUE AT OLIVE WAY 206-622-5000 ENVIRONMENTAL ECONOMICS SEATTLE, WASHINGTON 98101 MANAGEMENT 206-622-5000 FILE NO. WW-1577-ZZ1-MX April 29, 1981 6B Leonard md Boudinot Inc. Professional Engineers and Land Surveyors P.O. Box 327, 612 East Fairhaven Burlington, Washington 98233 Gentlemen: Subject: Trans Mountain.Oil Pipeline Review of Proposed Construction Skagit County, -Washin&@on Pursuant tothe terms of'our agreement for professional services, we submit herewith a letter report with our. comments on the design and con- struction aspects for that portion of the proposed Trans Mountain Low Point Project located in Skagit County, Washington. The basis for our comments relative to the design and construction aspects of the proposed Project are from the following sources: (1) a brief review of documents submitted by the Trans Mountain Oil 'Pipeline Corporation to the Energy Fa2ility Site Evaluation Council, State of Washington, in appli- cation for site certification of the Trans Mountain Low Point Project, filed August 21, '1979, revised December 31, 1980; (2) a field reconnaissance of the proposed route through Skagit County; and (3) a meeting with Trans Mountain engineers in their Seattle office. The documents submitted by the Trans Mountain Oil Pipeline Corpora- tion, a total of six volumes, with the application for site certificat ion are to be utilized in preparation of the Environmental Impact Statement for the Trans Mountain Low Point Project by the Energy Facility Site Evaluation Coun- oil, State of Washington. The probable environmental impacts of the Project were addressed in considerable detail. The engineering aspects of-the Project as addressed in the documents are of a preliminary nature. The scope of the Project is defined by written text and preliminary drawings depicting many of the facilities proposed for construction. The preliminary engineering appears to have been completed in conformance with the American.Code for Pressure Pip- ing, Liquid Petroleum Transportati on Systems (ANSI/ASME B 31.4). This code is the standard of the industry and would further-be adhered to in preparation of the final design of the proposed Project. The need for additional investiga- tions and studies as a prerequisite to final design*and construction are 4-1 Seattle, WA Denver, CO Phoenix, AZ Orlando, Fl. Columbus, NE - Wellesley, MA Indianapolis, IN Minneapolis, MN Nashville, 7N Sacramento, CA Leonard and Boudinot Inc. (2) April 29, 1981 addressed. Final design is not a prerequisite for' site certification of a proposed oil pipeline project. The field reconnaissance revealed no visible complications that would indicate the need for an alternate routing from the standpoint of pipe- line integrity. Minor adjustments in alignment may be necessary during final design for the purpose of facilitating construction or. to achieve the best possible location for pipeline integrity. South of the Burlington Tank Farm, the route traverses farm and pasturelands. The land is flat and there is no possibility of lateral earth movements (earthslides) that could result in dam- age to the pipeline. North of the Burlington Tank Farm, the proposed pipeline follows the route of can existing Trans Mountain oil pipeline. The existing line has been in operation since the late 1950's and to this time there have been no incidents to indicate that the soils along the route are not stable. With proper attention to construction procedures, it is reasonable to assume that a second pipeline can be constructed alongside the existing pipeline without adverse results. Generally, the pipeline route through Skagit County is not diffi- cult terrain for the construction of an oil pipeline. There is the possibil- ity of encountering groundwater in trenching operations, but with construction in the fall of the year and the utilization of proper dewatering equipment, this will present no problem. It is anticipated that pipe crews will be able to lay from 1.0 to 1.5 miles of pipe per day once the operation is underway. Construction crews will be organized to complete all operations as they prog- ress across the County, starting with right-of-way clearing and completing construction with right-of-way restoration. The primary concern in locating aquatic pipeline crossings is to select a site where the pipeline will be.stable. The pipeline can be placed at a large number of locations along the length of rivers and drainage chan- nels and satisfy this criterion. The determining factor becomes the routing of the pipeline as a whole. By application of sound engineering practices during site selection and final design, a stable pipeline can be achieved with minimal adverse environmental impacts upon the strewn and the surrounding area. To the best of our knowledge, public access will not be impeded and aesthetic impacts will be minimal at any one of the crossings as proposed. It must also be pointed out that*the Skagit and Samish River crossings will be subject to review and approval by state and Federal agencies. The final design for each crossing must meet their stringent requirements before con- struction is allowed. It is also the prerogative of affected drainage dis- tricts to exercise the'same requirement before allowing the crossing of drain- age facilities. Aquatic crossings by the oil pipeline in Skagit County consist of the crossing of the Skagit and:Samish Rivers and the crossing of drainage channels in the area south of the Burlington Tank Farm. The Samish River and drainage channel crossings are not difficult crossings to construct. As pipe- line construction is scheduled for the tall when streamflow is at a minimum, the crossings will, in all probability, be made by open cut of the trench Leonard and Boudinot Inc. April 29, 1981 crossing the channel. This method has two advantages from the standpoint of construction. It is the most economical method for construction of an aquatic pipeline crossing. It also affords the capability to.control construction methods and operations which will result in a completed facility of known sta- bility. The pipe under the streambed can be well founded to insure stability of the installation and the channel can be restored to a condition equal to or better than.existed prior to construction. The Skagit Rivercrossing is 1 .ocated west of and to the south of the City of Mount Vernon, approximately.1.5 miles north of the point of con- vergence of the north and south delta channels. The.width of the crossing, from levee to levee is approximately 1,450 feet, and Trans Mountain is propos- ing to use directional boring for construction of the entire crossing from the outside of 'the levee on each side of the river. Directional boring is a rela- tively new technique for constructing installations of this nature.. Direc- tional boring has, however, been utilized for many years in the oil industry for drilling oil wells. With the-advent of new instruments and modifications to boring machines, the method has been adapted for onshore construction of aquatic crossings such as the.Skagit River. Trans Mountain engineers have advised that this method has been successfully utilized several times in the recent past for similar installations. They have also advised that subsequent to preparation of the application for site certification, additional geotech- nical investigations have been made at the proposed site for the Skagit River crossing. The findings of these investigations indicate soils underlying the river are of sufficient strength to successfully permit construction of the proposed crossing by directional boring. In addition, the wall thickness of the pipe will be increased at the river crossing, a check valve will be installed on the north bank, and a remote controlled motor-operated block valve will be installed on the south bank. The pipe strength has been in- creased for added safety, and in the event of a breakin the pipe, the quan- tity of oil spilled will be limited to that in the pipe under the river between the two valves., By visual inspection, the site selected for the Burlington Tank Farm appears satisfactory. The site is located on high ground above the delta plain, and as such the underlying soils should be suitable for the proposed construction. The site is now heavily-timbered. With controlled clearing, the completed facility should be screened from view,within the immediate area. It may be visible from locations at a distance from the site and from areas of higher elevation. Preliminary plans call for the.Tank Farm to be completely bermed on -all sides to form an impoundment area of adequate size to contain all stored materials. The entire impoundment area will be sealed on the inside to pre- vent contamination of groundwater by the downward migration of oil from spills or overflows within the area. Provisions will be made at the site for treat- m ent of surface water runoff prior to release into natural drainageways. The low lying lands south of the Burlington Tank Farm appear to be subject to high groundwater levels thoughout most of the year. This condition Leonard and Boudinot Inc. (4) April 29, 1981 should be verified during final design and provisions made in the design to prevent flotation of the pipeline and contamination of the' groundwater by oil. The liquefaction characteristics of' native soils should also be investi- gated and provisions made to provide negative bouyancy should it be deemed necessary. There is also evidence that the pipeline crosses a fault in Skagit County. The activity of the failt is unknown and will have to be determined so that provisions can be made in the pipeline design to resist forces induced in the pipe by the movement of the earth.- Negative bouyancy to prevent pipe- line flotation can be provided by weighting the pipeline. Groundwater contam- ination can be minimized by lining the trench with an impervious material and constructing trench blocks at intervals along the pipeline. The possibility of the existence of these conditions has been addressed in the site certifica- tion application documents and are to be investigated in detail in the final design. It is believed that all four of these conditions are of such conse- quence as.to warrant review of the final design and supportive data by the County for assurance that preventative measures have been provided where nec- essary. It should also be pointed out that the pipeline passes within 0.5 mile of the Skagit River intake for the City of Anacortes' water supply treat- ment plant. Should oil enter the river-above the plant site, the water supply for the City of Anacortes could be effected. The proper design and construction of a pipeline, or any engineer- ing project, are both essential to successful completion of the Project. Pro- fessional and technical observations during construction assure that the work, when accepted, is substantially in accordance with. the contract documents. The responsibility for monitoring the pipeline construction is-not addressed in the site certification application documents. Transcripts of Trans Moun- tain answers to questions posed by the Department of Ecology do make mention of the subject to the extent that (1) "Discussions are now underway with coun- ties regarding construction monitoring. We anticipate that various state and Federal agencies will monitor such things as archaeological resources, state highway crossings and, of course, marine facility," and (2) "Trans Mountain and its contractors will employ personnel for the exclusive purpose of insur- ing that the pipeline and associated facilities are built to specification. There would be special inspectors for x-ray of welds, tie-ins, backfill, etc. In addition, an environmental inspector will be employed by Trans Mountain to insure that special environmental mitigation measures are incorporated." This is not a clear definition of who will be responsible for construction monitor- ing. A combination of both would be satisfactory. It is advised that there be an understanding pertaining to the division of these responsibilities prior to start of construction. In summation the comments stated herein concerning the construc- tion of the proposed Trans Mountain oil-pipeline within Skagit County does not, in our opinion, present any insurmountable problems that cannot be accom- modated during final design and construction. It is recommended that the County review the final design of the, Trans Mountain pipeline and insist on adequate construction inspection and restoration. There is always the risk of Leonard and Boudinot Inc. (5) April 29, 1981' an oil spill occurring from a facility in spite of preventive measures. How- ever, the impacts can be greatly mitigated when.the "state of the art" for oil pipeline construction is applied to the design and during construction. This is evidenced by the successful record of many miles of existing oil pipelines throughout the United States. If we can be of further assistance in answering any questions that the Commissioners. may have, please advise. Very truly yours, R. W. BECK AND ASSOCIATES Rai F. ScoffJjeld Principal Engineer RFS/bb L E G-E ND ................... DIVIING ots-TPUCT ac:)UNOA@-W-y PV-,-OV=1C)Sf-20, OI.L- MCDU-TE_ C Y 4AI -Y I-IA,117- ,17. 25 6 30 Q61 av .01 Pt. ......... . . VAI,<z @/@v -.,".4z7 .................... 5 10000. 2 ;000 Uft 4 ic f @4 36 25 12 h -4 14 A 7n ri 1X-1,---X> 7Y 7-Y -OA1 Nk. zrL- dl Lai L7 .... Z 1-7 Way. 536 McLean Rd. Ild PROPOSED. PIPE LINE 4,@, Ltvee N > 25 30 4F Levee LEVEE 0 SOOOII. 0 2 . "Britt 11 0 0 0 -j I )SIOQO U (D X, -m#e Prop*% COO) 500, 0 50d 36'Pipaline SCALI IN FEET OHW 10cO* 0 1000, VICINITY MAP CAsqr0nate: Lat. 48* 2 48: WM Coordinate: Lat. 48* 24' 44" N SCALE IN FEET 6 Lon. 12Z* 2 :46* W Lon. 1226 211 421 V N. Levee 1450 ft. Directionolly Drilled S. Levee 920' '401 465 bor 0 H W El + 10' NN, Proposed 36 pt pe I I ne 0` 5d 100 VERTICAL SCALE PRESENT RIVER BOTTOM [LEY. - - 20' 0 30, PROFILE ALONG PIPELINE MAxlMUH SCOUR DEPTH . 4 1, R MAXIMUM SCOUR ELEVATION --24* HORIZONTAL SCALE D. 0. T. REQUIRED BURIAL BELOW SCOUR DEPTH 4 KAXIMUM TOP PIPE- [LEY. 40' NO`rES I .Proposed 36" pipeline to be installed br directional drilling. 2. Approximate excavation volume 400 au- 749- 3 Excavated material to be placedon uplands. 071 OYB 2 006531 PURME: To transport cr-sde oil from storage area at Low Faint ?ROPOSED, SUBMARINE PIPELINE IN SKAGIT riiVER. NEAR MT.VERNON in Washington to Inland refineries and to refineries An Puget Sound. PIPELINE MILE Ic)I-6 (RIVER MILE 8.5) DATUM: N.G.V.D. - 0.01 0929) COUNTY OF,SKAGIT STATE OF NA4M]*GTON ADJACENT PROPERTY OWNERS: 5 Norman J. Brann APPLICATION IT TRANS MOU%YAIH OIL PIPE L!XE CORPORATION H. F. bf. Kurth 4 Edna Stiodge HEET A.. OF !4. DATE: 10 April. IMO k Ralph Oasterhoof 5 Edward Lundgren '7 Feb. )c`t6l Burllhgton@ 46 Proposed Northern R.R. -9 36"pipellne 03 40@ River ku J@ P7 0 OW j 50, IL X'Ing thli dwq. .4 LAT.' 480 31' 34" N 2 Pro 0sod LON. 122022*07"W .11 .,1 36" ipelin+ VY .C C4r@!.J- 0 j I 0 w Sam .8*11 RIJ. Existing pipeline Bearing ST03 E H w 1-@ y Bailin Slec. 13, T.35N, R.3E, WM. o ghom 20 Miles in' .,,Bur gton 2.5 Miles 14 ,13 Sam Bell Road 23'24 3 I.WQ =APQ ==Roo Feel P I a n 600 0 Itoo VICINITY MAP t F4 Fj F1 Feet NOTES 1. Ppoposrb 36, PIPELINE TO BE RUN PARALLEL TO Mud line) AND loo rT. rRom EXISTING 20- PIPLUNE WITHIN THE CbC-3SIMG. 8.5, F'roPosed 36*0 Pipalint Z.,iL-PROPERTY LINE concrest. river weighl'o 4% R646150fY 10 Provide a 3. EXCAVATE 71EKH WITH IIACKHDE, DRAGLINE A CLAMSHELL. MIRIMUnt 25# per foot negolive 4. APPROX. EXCAVATION W)tUK . IIIA976ACY When pipe It engply, 600 C.y. CONSI%IING Of SAND. GRAVEL. COBBLES OCLASIOKkL BOULDERS. APPROX. BACKFILL VOLUME S70 c.y. No scale Section thru french 5. EXCAVAXID FATCRIAL 70 BE VSIO FOR titctrILL. EXCESS KAIERIAL 10 It PLACID ON UPLANDS. 4. *PLACE RIP RAP Dis NORTH I SOUIM BANK 10 A MINIKM 15, RIP rep. THICKNES@ OF 2 ft. W (WrO ACADSI@ VIO14 Or 40' 1 CONSTRUC71ON DISTURBED ARIA TO A MAXIMLjK 100 ft. PROPOSED APPROX. RIP W VOLUMIE - 400 C.y. 5 0. H.w AIP- RAP tTyplOol) Elav. I I PRESENT SL .OUGH BOTTOM ELEY. -+8, 8-5,cover MAXIMUM SCOUR DEPTH . 4.5, 50, MAXIMUM SCOUR ELEVATION - + 3.5' D.O.T. itOUIRED BURIAL BELOW SCOUR DE FTH . 4 Vo.M. 60' River Section along pipe line MAXIMUM TOP PIK CLEV. -0.5, Hor. Purpose: To transport crude oil from Low Point, WA., to inland refineries. Datum. N.G. V. D. : 0.0 * (IM) 071--OYS -2-006531 A&MC[Ill ftOPERIY OWNERS Ac"rt Hills 3 [)via sammll SED SUWAAINE PIPELINE IN SAMISH RIVER. NEAR ALGER Monic& O'bryan 4 Einer Kunuto PIPELINE MILE 111.7 (RIVER MILE 6.1) COUIrly OF SKAGIT STATE Of WASHINGTON APPLICATION NY 7RARS MCIMAIN OIL PIPE LINE CORPORATION WET Of DATE: 10 April, 1990 REVISED: ',0MCir.M61 40' P, Rop"'o 0. H.W III P -RAP ITypl..I) over TYPICAL FIELD TILE DRAINS PLAN 0 0 0 8 9 o 0 LL, 0. 1 - :j -000 0 O-Ooor -T I a 0 0 0 o o 0 0 0 0 0 0 0 0 0 0 .0 I@ I . . 0 0 ........... If 7-/4 87. S6 /-f0a a4oo 3+oa 44-co 5-iLoo 400 7-o-00 &eOcj ? /0 too ///Oo 1Z to* - ---- ---- - - TYPICAL FIELD DRAIN PROFILES SKAGIT COUNTY PUBLIC WORKS DEPARTMENT County Administration Building - P.O. Box 396 Mount Vernon, WA 98273 W. Eugene Sampley. P.E. Judith A. LaFollette John B. Ensley Jack C. Rafter, P.E. Director Asst. Director Asst. Director Asst. Director Permit Center Operations Engineering (206) 336-9400 (206) 336-9410 (206).755-9531 (206) 336-9400 April 23, 1981 Leonard and Boudinot, Inc. P. 0. Box 327 Burlington, WA 98233 Re: Proposed Trans Mountain Oil Pipeline Dear Bob: The following is a list of our comments pertaining to the above referenced project. 1. Since this pipeline crosses several county roads, we should alert the pipeline company of the following: a. Roads that can be.open cut. b. Requirements for repairing roadway. c. Road closure procedure. d. Traffic control. e. Permit franchise requirements. 2. The pipeline crosses Dike District I an 3 and they will have certain requirements for going through their dikes. 3. The pipeline will also cross some drainage district ditches. I am sure they will have some concerns. 4. We have always had good cooperation with Trans Mountain but we have had problems with other line,owners. When the line is placed across open areas, it is placed close to the ground surface and all requests to cross the line have to be approved by the utility. This is fine if you assume the utility will cooperate and negotiate an agreement mutually acceptable. This has not always been the case and if they will not cooperate, the utility has Leonard and Boudinot, Inc. April 23, 1981 Page 2 unreasonable control of land use on and across their easement as well as the adjoining property. Very truly yours; W. EUGENE SAMPLEY P.E. Public Works Direct BY: JACK C. RAFTER, P.E Assistant Director of Public Works JCR:bjs ClrrY OIFAT,,,TACOHrr]ES,WINSIIII@-lcxrrol*.q 98221 April 17, 1981 too Mr. John Leonard. Leonard & Boudinot, Inc. 612 East Fairhaven Burlington, WA 98233 RE: Trans-Mountain Pipeline Dear John: Enclosed are utility maps showing the'area where the proposed Trans- Mountain Pipeline will cross the City's 36" and 24" transmission lines in the vicinity of Bennett Road and Memorial Highway. This letter also will acknowledge our ineeting with you of April 15, 1981, to discuss possible problems.and/or solutions for the proposed crossing. I would like to offer the following comments with regard to the proposal: 1. In reviewing the proposed project with you and considering the location of the pipeline in regards to the river, river dikes, and the@Cityls intake structure, it appears that a possible oil spilifrom a break in the pipeline would not become a major problem to the City. 2. An area of concern is possible electrolysis and deterioration of our pipelines from bein ltin close proximity to the Trans- Mountain lines. 'This @4ou be especially true if Trans- Mountain protects their pipelines with a cathodic protection device. Even the close proximity of the pipelines, while of similar materail, could set up possible differences in electrical potential. I would request that upon completion of the project (assuming it is built) that Trans-Mountain have a recognized corrosion engineer or engineering firm test the potential between the pipelines and provide a letter to my office assuring the City that no electrolysis potential exists or if it does exist what measures will be taken to mitigate the.problem. 3. Another concern that we have is with puncturing of our water- lines during the installation of the Tran,s-Mountain line. Both the 24" and 36" pipelines operate at pressures between 150 and 180 PSI and.provide water to three cities including the City of Anacortes, two oil refineries, and NAS Whidbey on Whidbey Island. Prior to making.the crossing, we would require ADMINISTRAT ION FIRE DEPARTMENT POLICE DEPARTMENT PUBLIC LIBRARY. MUSEUM OF HISTORY P'0. BOX 547 1011 112TH STREET 1011 12TH STREET 1209 9TH STREET 1305 8TH STREET (206) 293-5171 (206) 293-5171 (206) 293-5171 (206) 293-2700 (2 06) 2 93 -5 171 Mr. John'teonard April 17, 1981 Page 2 that the exact depth of both pipelines.be determined by physical excavation of the lines. A representative of the City's Public Works Department is to be present when'theexcavation is made. City personnel will physically locate the horizontal alignment of both pipelines. I hope the above and the enclosed provide you with the information necessary to proceed with your investigations. If you have any questions or require additional data or wish to.discuss the project further, please let me know.' Any new information which you might receive or additional progress on the project, I would be interested in knowing. .Sincerely yours, CITY OF ANACORTES David M. Ford, Jr., P.E. Director of Public Works DMF:sg Enclosures cc: Robert Olander Bruce Bell J A-A -IA F-T ?k, D, N', G To di W Of -2 Sl Sss--L LL CITY -OF AN,4CORTES I ryl p I @_', @ k*- R 0 V E N", E N T9, T WAT R, PLY SY T M U N I- T N 0 SCHEDULE C A V 0 N -1'. F ON .55 00 PLAN b PRr,,)FIL'-- STA 36--+08 TO 45+0'0 A R E_ K* R A M E R A N N "UL.-FING ENGlNE_ER,___) C., '@Sr ING70N F A7:7 Nic @jy- -A P R, 5 B 0, -5 0. 8 C) kl) ---------- -,C4.jf-.TUui@a-4 TJ a .4LLONep t@ T.1- t1a 0 V A N r fr- LL ok 24 PIP LN". 4TA. 3e,+CO)48 OW4, NO. 9780 9 < 72 --?@tsyz 41C 1 -37+00 4-- 00 vV 4 T H' EXACT '-OCATIOW) t7LE-VATIO@4, :@j 0.0. OF- r--X167. Z4q PIPE AT 5*03 To E:)Mr D C-T R M I rl@ E: D T V...% .4 T-If 51bY COW1 RACT09 tN -rP C- FIL-LID. ) th EXISTING 24 STEEL WATER"' MAIN 0 EX1,57 OILED -BLO C SURFACE' EXI 5 T I-EEL EXISTING 3e STEEL WATER MAIN @:`22":F aENO. co/vi J 71 7 THR'US 7 BLOC K, '4`@ WC OD ... .......... ...... ............. ---------- - .... . ..... -.j 0 36#00 37+00 RUTH E. GIDLUND. MAYOR MICHAEL WOODMANSEE. CITY TREASURER DON SEMRAU. CITY ENGINEER City of LARRY MOLLER. CITY ATIO-EY ount RONALD MAYNOCK. SU,LDING .11ICIAL Post Off ice Box 809 ernon, Washington 98273 Telephone 336-6585 May 18, 1981 Leonard & Boudinot, Inc. 612 East Fairhaven Avenue Burlington, Washington 98233 ATTN: Bob Boudinot RE: Trans-Mountain Oil Pipeline' Dear Bob: This letter is to confirm our conversation of April 13, 1981, concerning your review of the E.I.S. for the proposed Trans-Mou.ntain Pipeline. The pipeline as proposed would include approximately 750 feet in length through property owned by the City of Mount Vernon and recently annexed to the City. Olympic Pipeline also has a pipe within an easement over this City property. You mentioned the construction plan includes double ditching through agricultural property. Said City property is in agricultural use and will most likely remain in this use. We would most certainly be interested in preserving the agricultural topsoil. The City property is now leased to a farmer for cropping, so any proposed construction wil.1 have to be preceded by an agreement for crop damage. As I understand it, there are.no detail design pl ans available at this time, however, the proposed minimum depth to'the top of the pipe is to be 40". This depth would be acceptable. The City wishes to use this property for municipal sludge disposal so we will be concerned about backfill of the pipeline trench as.that might relate to ground water quality and leachates. Sorry to be so slow in sending you this letter. It was an easy one to set aside and you did not keep calling me. Sincerely, Don Semrau, PLS & PE City Engineer DS:ch oun' )9 ;ern@i A --7a William A. Roozen, Commissioner Dike District No. 1 1599 Beaver Marsh Road Mount Vernon, WA 98273 April 21, 1981 Mr. John Leonard Leonard and Boudinot, Inc. P.O. Box 327 Burlington, WA 98233 Reference: Trans Mountain Pipeline Dear Mr. Leonard: This letter is to reiterate the concerns we.expressed at our meeting of April 15, 1981, with you, Robert Boudinot, and Dike District No. 1 Commissioners, Bill Roozen, Tom Shane, and Robert Dean. We are very concerned that residents in our Dike District are protected at all times from any failure or disruption of the dikes'along the Skagit River. We would like Trans Mountain Oil Pipeline Corporation to be put on notice at this time that we will impose certain requirements to protect our dikes and that we have the following questions for which we request an answer. 1. Question: Why can't Trans Mountain Oil Pipeline Co'rporation use the same right-of-way that Olympic Pipeline uses, thereby having only one right-of@way through the county rather than two? 2. Question: How far back from the outside of the dikes will. the boring procedure take place? The cross section indicates drilling from edge of dike to edge of dike., This could indan- ger our dikes. 3. Question: What i s the name, address, and office phone number of the chief executive officer of Trans Mountain Oil Pipeline Corporation? 4. In our opini on steel baffle plates around the pipe should be installed at each.end of the pipeline crossing. If baffles are not proposed, we would like a full explanation. 5. If our dikes are cut for any reason, we will demand that the opening not exceed a 48 hour period. Mr. John Leonard Page 2 April 21, 1981 6. If the dikes are cut, we will require that a D-8 bulldozer or equal in good condition be at the site'one day prior to. the dike opening, all during the operation,.and one day after the dike cut. 7. If the dikes are cut, the dozer operator shall' be available on a one hour call basis for one day prior to, during, and one day after the dike opening. 8. The dike will be repaired with material a nd construction conforming to State of Washington specifications, including 96 percent compaction and a clay core. 9. Any riprap disturbed will be replaced with two foot diameter or greater riprap rock choked.with two inch crushed rock. 10. The surface of the -disturbed dike will be covered with ade- quate topsoil and seeded with pasture mix at 20 pounds per acre. 11. The Dike District mus@t have hold.harmless agreement from the Trans Mountain Oil Pipeline Corporation and the pipeline contractor or contractors. 12. If a dispute arises between Trans Mountain Oil Pipeline Corpo- ration and Dike District No. 1, Trans Mountain Oil Pipeline Corporation shall agree to pay all-legal fees for the litigation. 13. The Dike District will have a professional engineer inspecting all construction work in the vicinity of the river crossing. This engineering time will be paid for by Trans Mountain Oil Pipeline Corporation. It is also to be emphasized that the Dike District will choose their inspecting engineer. The above points should not be considered our only concerns. .I am sure that additional points will be 'considered as your design proceeds. In summary, Dike District No. 1 is not looki 'ng for any compensation due to this project, but are seeking the total protection for the people within the Dike District. This is the job we are charged with and we. will do our utmost,-.to,-.fulfill our responsibility. Sincerel X A Wil am Roozen Dike District Commissioner Richard Smith, Commissioner Dike District No. 3 1849 Dike Road Mount Vernon, WA 98273 April 24, 1981 Mr. John Leonard Leonard and Boudinot, Inc. P.O. Box 327 Burlington, WA 98233 Reference: Trans Mountain P.ipel'ine Dear John: .Thank you.for the meeting with myself and Mr. Olson re.garding the Trans Mountain Pipeline route through our Dike District No. 3. From our past experience with other pipeline construction projects through our district, we are quite familiar with the problems that the construction.of this large pipeline will encounter. I would.like to point out the followi.ng concerns: 1. Regardless of the method of construction across the Skagit.River, whether it be drilled or open cut, we will require two see,page barriers within our dike area on the pipe. If the pipelin'e is drilled under the river as proposed, there is no way of knowing the final diameter of the hole excavated under the dike, so pipe must be exposed and barriers installed. 2. We note from the plansIthat the pipe is not very deep under the dike and may need to be deeper at that point. 3. There is a surface crust on the soil through this general area of 5 to 6 feet, below which you will encounter'quicksand. Any exca- vation within that quicksand area is extremely difficult and causes large cave-in areas. Olympic Pipeline encountered severe difficulty crossing underneath Old Highway 99 at the time they constructed their pipeline. 4. We would recommend the pipeline be routed next to the railroad between Conway and the Stackpole Road. 5. At Fisher Slough, we wish to point out that the pipeline must be quite deep under the bottom of the slough, since maintenance of that slough requires use of a drag line for excavation of sedi- ment. We want the'pipeline deep enough to allow that maintenance excavation to continue. 6. Trans-Mountain Pipeline must be aware that crossing Fisher Slough will require working within the quicksand area below the surface Mr. John Leonard Page 2 April 24, 1981 crust which will probably pose more difficulty than is expected. Depending upon the success of that boring operation, we may require that seepage barriers beinstalled on each side of the slough crossing. 7. We do not want above ground structures on any of the dikes. 8. There shall be no construction at the-Fisher Slough crossing or the Skagit River prior to June 15 or after October 15. It is very important that the integrity of this dike be maintained at all times during the period of potential flooding. The foregoing items are the main concerns which come to mind a t this time and should not be taken as our only items of concern. Prior to any con- struction at Fisher Slough or the Skagit River, the proper agreement must be prepared and signed by our district commissioners and the Trans Moun- tain Pipeline Company. We do not look forward to having this pipeline crossing our farms within the district, but we realize that other routes out of the farmland are*probably impractical. Sincerely, Richard Smith ct, Contirwntal Telephorle of the Northwest Engineering Department P.O. Box 579 Mount Vernon, Washington 98273 April 24, 1981 Leonard and Boudinot Inc. 612 E. Fairhaven Ave. Burlington, Wash. 98233 Attention Bob Boudinot Gentlemen: our company suggests that most conflict with our facilities would be avoided if the proposed Trans-Mountain pipeline-was at a minimum 4811 depth It appears roughly that the line may cross our cables in about ten locations. There may also be several poles requiring relocation. I hope this information may be of use. Again, thanks for the advance notice 'of the project. Sincerely, Bob Knight Dist. Engineering mgr. BK/pa /0 JA' -AL. A L A4 4ZA V .X 6A, P-.1 Dike District No. 3. dike along Fisher Slough Mp 95.1 P-2 Fisher Slough MP 95.1 P-3 Fisher Slough MP 95.1 P-4 Drainage District No. 17 ditch southwest of 175 Conway Interchange MP 96.3 -S '44 tv 41. t 7- f. ICU ............ P-5 Culvert in Drainage District No. 17 ditch southwest of P-6 Drainage District No. 17 ditch west of 1-5 MP 96.5 1-5 Conway Interchange MP 96.3 P-7 Dike District No. 3 dike south of Skagit River MP 101 .4 P-8 Location of boring pit south of Skagi t Ri ver MP 101 991 1A We Z .. .... TV, ALI P-9 Skagit River crossing looking north MP 101.6 P-10 Skagit River crossing looking South MP 101 .7 P-11 Burlington tank farm site looking west from Ovenell P-12 @urlington tank farm sit t south of Ovenell Road Road MP 106.0 left of road in picture@ OL .4 M IR, V7 .44T A - - - - - - - - - - 27ij I L '.1 . . . . . . . . . . . . . .VIX P-13 Drainage District No. 14 ditch looking west from P-14 Allen Elementary School MP 110.3 Avon-Allen Road MP 109.3 P-15 Existing 20-inch pipeline right-of-way north of P-16 Existing 20-inch pipeline right-of-way looking Bell Road MP 110.8 south from Bow Hill MP 111.8 . . . . ....... -ItY REFERENCES AND INTERVIEWS 1. Skagit County Public Works Department: Meeting.with Mr. Jack Rafter, Assistant Director of Engineeri,ng, March 27, 1981 2. City of Mount Vernon: Meeting with Mr. Don-)Semrau, C ity Engineer, April 15, 1981 3..City of Anacortes: Meeting with Mr. Robert Olander, City Manager, and Mr. David M. Ford, Director of Public Works, April 15, 1981 4. Port of Skagit County: Meeting with Mr. Daniel O'Donnell, Manager, April 28, 1981 5. U.S.D.A. Soil Conservation Service: 'Meeting with Ms Peggy Olds, District Manager, April 22, 1981 6. Trans Mountain Oil Pipeline Corporation: Meeting with Mr. D. Trevor Durrant, April 9, 1981 7. Department of Ecology: Telephone.conversation with Mr. Steve West, April 10, 1981 8. Skagit County Public Utility District No. 1: Meeting with Mr. Jack Doty, Manager, April 27, 1981 9. Dike District No. I:. Meeting with Mr. William Roozen, Mr. Robert Dean, Jr., and Mr. Tom Shane, April 15, 1981 10. Dike District No. 3: Meeting with Mr.. Richard Smith, Commissioner, April 23, 1981 11. Drainage District No. 14: Meeting with Mr. Roger Knutzen, April 27, 1981 12. Drainage District No. 17: Phone conversation with Mr. Charles Waltner, April 20, 1981 13. Drainage District No. 19: Meeting with Mr. Nick Aarstad and Mr.. Harold Abbott, April 21., 1981 14. Skagit County Utility C oordinating Council: Meeting with utility companies at Coordinating Council regular meeting, April 23, 1981 15. Meeting with Mr. Dennis 04Brien, private property owner, April 28, 1981 JOAA rOASTAL SERVICES CTR LIBRARY 3 6668 14112793 8