[From the U.S. Government Printing Office, www.gpo.gov]
S E SUITABLE STUMM FOR ONSHORE OIL IT AND GAS RELATEED FACILITIES FOR THE NEW HAMPSHERE COASTAL ZONE Jun 1977 Er ga TN li @J 871.5 .S57 1977 SITE SUITABILITY STUDY FOR ONSHORE OIL AND GAS RELATED FACILITIES FOR THE NEW HAMPSHIRE COASTAL ZONE Property of CSC Library BY STRAFFORD ROCKINGHAM REGIONAL COUNCIL U.S. DEPARTMENT OF COMMERCE NOAA COASTAL SERVICES CENTER 2234 SOUTH HOBSON AVENUE CHARLESTON, SC 29405-2413 This report was financed in part by the Coastal Zone Management Act of 1972, administered by the Office of Coastal Zone Management, National Oceanic and At- mispheric Administration. June 29, 1977 COASTAL ZONE INFORMATION CENTER INTRODUCTION Outer Continental Shelf oil activity in the vicinity of the Georges Bank can be expected,to have an impact on the coastal communities of New England. Onshore facilities which will be needed to explore and later to develop, produce and distribute oil and gas resources, will for economic reasons, have to be located as near as possible to drilling activities. New Hampshire has a very limited amount of coastline. However, with the Great Bay Estuary and Piscataqua River Basin, seventeen New Hampshire towns are located on tidal waters. Although OCS activities will largely be out of the hands of municipal and state authorities, the onshore impact of OCS development can be prepared for. This study is intended to provide a data base to be used in planning for onshore development which may result from offshore oil. A systematic approach has been taken to gathering information about the availability of services and land suitable for development within the coastal munici- palities. This information will be used by the state to identify the local impacts which will occur if private industry proposes a specific OCS-related development in New Hampshire's Coastal Zone. INTRODUCTION Outer Continental Shelf oil activity in the vicinity of the Georges Bank can be expected to have an impact on the coastal communities of New England. Onshore facilities which will be needed to explore and ter to develop, produce and distribute oil and gas resources will la for economic reasons, have to be located as near as possible to drilling activities. New Hampshire has a very limited amount of coastline. However, with the Great Bay Estuary and Piscataqua River Basin, seventeen New Hampshire towns are located on tidal waters. Although OCS activity will largely be out of the hands of municipal and state authorities, the onshore impact of OCS development can be prepared for. This study is intended to provide a data base to be used in planning for onshore development which may result from offshore oil,, A systematic -approach has been taken to gathering information about the availability of services and land suitable for development within the coastal munici- palities. This information will be used by the state in adopting a specific OCS-related development proposal. 77 WOLFEBORO -nar pri, y zone M secon-dary. zone GILFORD tertiary zone ONT ALTON COASTAL ZONE-MUNICIPALITIE @D MILTON GILWIANTON 0 C FARMIN TON -00 BARNSTEAD LOUDON ROCHESTER -A STRAFFORD cA@ PITTSFIELD ORT, @'T @' W. @ ' ORD 0 cl AS OLLIN 0 BARRINGTON N- EPSOM ORTHWOOD \DO E v '4f C. -(1A WEIROKEF, --- - ---/ \ @1)1 0<"A@ DEERFIELD 1--@@L@NSTOWN /Nlj NOTT INGHAM LEE DURHA U HOOKSETT )POR CANDIA ia @'A 4EWMARKE mot) RAYMOND EPPING EwFIELDS 4 - - - - - - TRA.T- XETER -Z R I HAM rjCHESTEk I- @ ) I FREMONTI BREN I -4 LWN 0 ol I", NORTH Z__ AUBUR HAMPTON CHI-STER KIN GST Ot r AMPTO "4',0 IDAN- I 'EAST @04@V@VILLE I xIKINGS@ TON DERRY S HAMPTO -qa -',)NEWTO@@ TKINSO 6 y METHODOLOGY The following report has been divided into two major parts. Part I consists of three sections on the Primary/Secondary Coastal Zone municipalities. First, general municipal data have been given for each community. The OCP outline has been followed using the most current information available, the sources of which are outlined at the beginning of the section. In the second section of Part 1, specific parcels of land of predominantly good or execellent development capability hav@e been delineated within each town in the primary/ secondary zone. These sites have been Interpreted from the Coastal Zone Study Land and Water Use Capability Map, using a 50-acre minimum. No attempt has been made to predict the type of facility that could be sited in any particular parcel. Data was accumulated methodically for each site, using the sources outlined at the beginning of the section on'parcel data. The third section of Part 1 is on the Port of Portsmouth/Newington which Includes the coastline of Portsmouth and Newington on the Plscataqua River. Since seven of the eleven facility data sheets received from the OCP describe facilities that have to be located in a sheltered harbor with sufficient water depth, particular att0tion was given to site specific locations on the Piscataqua. River, the only deep water harbor in New Hampshire. This section of the study includes maps showing existing commercial facilities on the New Hampshire side of the river along the 35-ft. deep channel, and a brief description of some of the characteristics of the river. Finally, the possible sites for specific onshore facilities have been identified and in some cases, described. This facility specific section of the report was discontinued before completion, under the direction of OCP. Part 2 of the report contains two sections on the Tertiary Coastal Zone municipalities. Basic information gathered for each tertiary zone community has been included In the General Municipal Data section. In the second section, specific parcels of land have been identified which have 75% or more of their area in the moderate or intense development capability categories and are located adjacent to a state primary or secondary highway. Information was collected for each of. these sites according to the same format and method used in the primary/ secondary zone. No site of less than 200 acres was considered in the tertiary zone, Seven towns in the tertiary zone were found to have 50% or more of their entire area with moderate or intense development capability. Each of these towns has been treated as an individual site in order to avoid the cumbersome volume of data which a delineation of sub-municipal sites in these towns would create. A map locating the areas of intense and moderate development capability accompanies the description of each town. The OCP data outline has been followed for the tertiary zone, using the best information available. One departure from the outline became necessary in section two where the distances to water and sewer hookups were replaced by distances to the nearest water supply and sewer serviced areas. It should also be noted that throughout the entire report, the data given represents the closest estimates which could be arrived at using the available information but.without the benefit of field inspections or precise on-site calculations. BIBLIOGRAPHY Bradleyj Edward. 1964. "Geology and Groundwater Resources of Southeastern New Hampshire". Geological Survey Water Supply Paper. Department of the Army - New England Division, Corps of Engineers. October 1969. "Great and Little Bays Their Tributaries and Adjoining Tributaries of the Piscataqua River Survey (Review of Reports)II, Department of the Army - New England Division, Corps of Engineers. July 1976. "Southeast New Hampshire Water Supply Study - Estimated Demands and Resource Availability". Department of Revenue. "State of New Hampshire 1974 and 1975 Tax Rates Equalized Assessment Ratio". Maguire, E.C. November 1974. "The Port of Portsmouth - A Feasibility Study by C.E. Maguire, Inc." New England River Basins Commission. January 1976. "A Methodology for the Siting of Onshore Facilities Associated with OCS Development." Draft Interim Report # 1. New Hampshire Water Supply and Pollution Control Commission. January 1975. "Piscataqua River and Coastal N.H. Basins., Water Quality Management Plan." Southeastern New Hampshire Regional Planning Commission. "Traffic: Piscataqua River Portsmouth Harbor." Southeastern New Hampshire Regional Planning Commission. August 1972. "Water Supply Report # 6." Southeastern New Hampshire Regional. Planning Commission. December 1973. "Existing Land Use -.Report # 3.11 Southeastern New Hampshire Regional Planning Commission. May 1972. "Local Planning and Zoning - Report 4.", Southeastern New Hampshire Regional Planning Commission. August 1972. "Wastewater Disposal - Report 7.b-1"' Strafford Regional Planning'Commission. October 1975. "Southern Strafford Region: An Environmental Planning Study." Strafford Rockingham Regional Council. "Current Data on Coastal Zone Planning Area." U.S. Department of Agriculture Soil Conservation Service. March 1973. "Soil Survey of Strafford County, New Hampshire." U.S. Department of Agriculture Soil Conservation Service. "Soil Survey of Rockingham County, New Hampshire." Wilson,_ John A. May 1969. "Regional Planning: New Hampshire - Maine, Part 2, Surface Water Resources, Groundwater Resources, Climate." University of New Hampshire. PR IM,ARY/ SECONDARY ZONE PART 1 GENERAL MUNICIPAL DATA PRIPwIARY/SECONDARY ZOMIE Sources of General Municipal Data for Communities in the Primaryand Secondary Coastal Zones: 1) Municipal Tax Rate (Equalized) - State Department of Revenue publication 1974 and 1975 Tax Rates Equalized Assessment Ratios" (note: more recent information will be available in February) 2) County Tax Rate - Municipal Accounting Office of the New Hampshire Tax Commission 3) Municipal Water Available - town officials 4) Municipal Sewer Available - town officials 5) Number of known aquifers - Army Corps of Engineers report "Southeast New Hampshire Water Supply Study, Estimated Demands and Resource Availability", page 43 map plate 7 - town's estimated groundwater potential - Army Corps of Engineers report "Southeast New Hampshire Water Supply Study, Estimated Demands and Resource Availability", tables on pages 41-42 6) (For communities on Tidal Waters) Are commercial harbor facilities available - type of commercial activities and facilities available at existing harbors - potential for expanding existing harbor facilities or for the establishment of new harbor facilities A variety of sources were used to obtain information about New Hampshire's harbors. These included the harbor masters of Portsmouth, Rye, Hampton and the Great Bay, Mr. Smith at the Port Authority Marine Terminal, Richard and Shirley Holtz at Portsmouth Navigation and the Army Corps of Engineers report "Great and Little Bays, Their Tributaries and Adjoining Tributaries of the Piscataqua River". TOWN: DOVER .General Municipal Data 1) Municipal Tax Rate (Equalized) $33..58/1000 evaluation 2) County Tax Rate (Equalized) - $25.82/1000 evaluation 3) Municipal Water Available - Yes - sustainable yield of supply: 3.7 mgd - current daily use: 2.7 mgd 4) Municipal Sewer Available - Yes - excess capacity: 1.5 mgd (Dover now handles an average of 1.5 mgd and has room for an additional 1 5 mgd. Within two years Dover will have a secondary treatment plant with a design capacity of 8 m;d.) - type of treatment: primary (Dover is in the process of changing to secondary treatment.) 5) Number of Known Aquifers - 10 - Dover's estimated groundwater potential: .73 mgd 6) Commercial Harbor Facilities Available No (Alongside Dover, the Piscataqua River has a depth of 6 feet at m1w. Navigational difficulties, there include rocks in the access channel to the state boat ramp at Hilton Park at Dover, Point and extensive tidal flats which extend from the shoreline to the channel. The Cocheco River has a m'lw depth of 4 feet but water pollution from Rochester's untreated sewaqe is repulsive to boaters. The one facility on the river is George's Marina, located downstream from Dover center. The Little Bay is 12.feet deep@at m1w, with strong currents near the General Sullivan Bridge, particularly at ebb tide. Ben's Marina on Dover Point is a privately owned facility with a boat ramp, 15 moorings, and 45 slips for boats up to 25 feet long. The lower half of the Bellamy River has a depth of 4 feet at m1w. The upper half is a shallower 2 ft. deep at m1w. The highway bridge near the mouth of the river is a fixed span which limits navigation of the river. TOWN: DURHAM General Municipal Data 1) Municipal Tax Rate (Equalized) $24.12/1000 evaluation 2) County Tax Rate(Equalized) - $25.82/1000 evaluation 3) Municipal Water Available - Yes sustainable yield of supply: 1.7 mgd current daily use: 1 mgd 4) MunlclW Sewer Available - Yes excess capacity: 600,000 gd (Durham has a primary treatment plant with a design capacity of 1.3 mgd, presently handling 722,000 gd. A secondary treatment plant, with a design capacity of 3.8 mgd is scheduled to be completed in 3 years.) type of treatment .; primary 5) Number of Known Aquifers - 4 Durham's estimated groundwater potential: 0 6) Commercial Harbor Facilities Available - No (The Little Bay is 12 feet deep at m1w, with strong currents near the General Sullivan Bridge, particularly at ebb tide. The lower .5 mile section of the Oyster River averages 7 ft. deep at mlw but upstream becomes as shallow as.1 ft. deep. The Durham and the Jackson Town Landings are located in the shallow upper halfof the river. Other facilities in Durham include Adam's Point Landing and the State Boat Ramp, where launching is restricted during tidal periods.) TOWN: EXETER General Municipal Data 1) Municipal Tax Rate (Equalized) - $17.88/1000 evaluation 2) County Tax Rate (Equalized) - $24.73/1000 evaluation 3) Municipal Water Available - Yes sustainable yield of supply: 4.93 mgd current daily use: winter - 850,000 mgd summer - I mgd 4) Municipal Sewer Available - Yes - excess capacity: No (Some hydraulic capacity but no B.O.D. capacity. The design capacity of the 32 acres of lagoons has been exceeded, thereby failing to meet the requirements of the New Hampshire Water Supply and Pollution Control Commission. Designed to serve.6400 people, the present system is overloaded by approximately 3000 people.) - type of treatment: lagoons 5) Number of Known Aquifers - I - Exeter's estimated groundwater potential: .71 mgd 6) Commercial Harbor Facilities Available - No (There is tidal water up the Squamscott River to the dam in Exeter. The lower 6.5 miles of the river are 4 feet deep at mean low water (mlw) but the upper .5 mile of the river is shallower. Fixed spans at the railroad and highway bridges near the mouth of the river, with vertical clearances at mhw of 5 feet and 9.5 feet, limit use of the river except for outboards.) TOWN: GREENLAND General-Municipal_Data 1) Municipal Tax Rate (Equalized) $25.37/1000 evaluation 2) County Tax Rate (Equalized) - $24.73/1000 evaluation 3) Municipal Water Available - W/Portsmouth 4) Mu nicipal Sewer Available- No 5) Number of Known Aquifers 5 - Greenland's estimated groundwater potential: 1.39 mgd 6) Commercial Harbor Facilities Available No - (The Great Bay harbormaster reports that there is even very little recreational boating@ around Greenland. For the most part, pu*blic access to the bay is limited by private property owners on the waterfront.) TOWN: HAMPTON General Municipal Data 1) Municipal Tax Rate (Equalized) $24.02/1000 evaluation 2) County Tax Rate (Equalized) - $24.73/1000 evaluation 41 4@ 3) Municipal Water Available - Yes - sustainable yield of supply: 5.65 mgd - current daily use: winter - 1.2 mgd summer - 3.4 mgd 4) Municipal Sewer Available - Yes - excess capacity: Yes - approximately 13.4 mgd in the winter and 12.4 mgd in the summer (Hampton's new secondary treatment plant is designed for 14.4 mgd. At present the@system is receiving approximately I mgd in the winter and 2 mgd in the summer.) 5) Number of Known Aquifers - I - Hampton's estimated groundwater potential: 3.79 mgd 6) Commercial Harbor Facilities Available - Yes - type of commercial activities and facilities available at existing harbors: Hampton Harbor is located at the mouth of the Hampton River, about a half a mile in from the ocean. It is unsheltered, surrounded primarily by marshlands without trees. The current in the harbor is a strong 10 knots which prevents boats from holding with an anch r. There are approximately 22 acres where a depth of 6 feet is maintained. During the summe months approximately 500 boats are in the harbor each weekend. There are 300 moorings, 1 0 boats in the marina, 70 boats at the boatclub and 2 ramps for putting boats in the water. About 100 vessels are used for commercial fishing, mostly for lobster. In the winter the ice shifts around at such speed that only 5-6 boats are left in Hampton Harbor. Some are moved over to Seabrook for the winter. 0 50, Ij 8' 47' 41 Z % HAMPTON HARBOR 14 @Grent Poflr:6.He84 Cocale 1':30,000 16. 36 -1,20 Potenti 420 harbor 25 TA X 2 establ i Marsh 7 4 :hrd 45 S Blind Cr. 25 facilit 39 -4 5' Owners 2'.... 11timpt It 23 3..'--. C11C 1.1, 4/ 28 in the 20 Ard S 47 Harbor 2 harborme 6 2 Maf@h 3 HANiffod 5001 use the 17 a large 4 33 2'. 1: 14ARNA, Althoug@ M a r z h 43 i 26 Engineer -15' 26 2 maintain 33 7 R S-. 3 Marini 50 NW hrd sand is 21 Ra Rif 9 *-. away and 3 126 34 41 no ti 56- 54' in c, 4 W-4 Dk R. CL. 10 A U 7 H',... 9 8 RT. CL@ The brid '6 0, omptoll 17 50' 32 the harb Harbor R P rc 69 clearanc R4 Re Pil 31 : :2 C', 9 -.43 t.... the pote 4 1211' ........ @-4 N 75 1 4 -.4, -7- 7 Ra Rif 4*9 '1.....17 14. 47 vessels. -11 "A 2 4.", . * 22.*... Rif ...... N.. 53 figures 2 3 22 that wou 69 V 49 .7 50 2 to ........ V harbor i q 45 S.-' 14 than 40 54 65 @2; 44 GONG 50 60 Marsh 116 33 1 47 )?A23 29 14U 50 36 A S ...... 9 33 39 41 63 40 28 52 22 :540RW 37 A 53'- 48- 58 69 ;Fr 53' Seitbrookk-ll - -.19 i ?.;----34 41 0 R 4,.c BELL B.Sch 33 (Va Rj Ref 24 ..J!Y: 58 37 40 HAMPTON HARBOR 57 2' NTRANC 5.: rk E E.CHANNEL -20 35 T h 35 controllirl2 depth was 51 '14' 44 feet for at width of 150 feet. 21 20: 41 5? 55 ZW!21 !-rky April 1972- 47 1 .: Nautical M.1, :14 L (30 Nund 7?* Y.,ds SW 250 0 500 1000 15W OW IF 1 451 30. 15, 50- 70*49, 48' 47' TOWN: HAMPTON FALLS General Municipal Data 1) Municipal Tax Rate (Equalized) $7.99/1000 evaluation 2) County Tax Rate (Equalized) - $24.73/1000 evaluation 3) Municipal Water Available - No 4) Municipal Sewer Available No 5) Number of Known Aquifers 0. Hampton Falls' estimated groundwater potential: 0 6) Commercial Harbor Facilities Available No TOWN: MADBURY General Municipal Data 1) Municipal Tax Rate (Equalized) $22.05/1000 evaluation 2) County Tax Rate (Equalized) $25.82/1000 evaluation 3) Municipal Water Available No 4) Municipal Sewer Available No 5) Number of Known Aquifers 2 Madbury's estimated groundwater potential: 1.48 mgd 6) Commercial Harbor Facilities Available No TOWN: NEW CASTLE General Municipal Data 1) Municipal Tax Rate (Equalized) $14.40/1000 evaluation 2) County Tax Rate (Equalized) - $24.73/1000 evaluation. 3) Municipal Water Available W/Portsmouth 4) Municipal Sewer Available W/Portsmouth Number of Known Aquifers - 0 New Castlels estimated groundwater potential: 0 6)- Commercial Harbor Facilities Available No TOWN: NEWFIELDS General Municipal Data V @Id 1) Municipal Tax Rate (Equalized) $21.50/1000 evaluation 2) County Tax Rate (Equalized) - $24.73/1000 evaluation 3) Municipal Water Available Yes sustainable yield of supply: 25,000 gd (not exact figure) current daily use: 25,000 gd (with no water to spare, the Newfields Water Commission is presently looking for a new source of supply) 4) Municipal Sewer Available - Construction pending 5) Number of Known Aquifers - 2 Newfield's estimated groundwater potential: .82 mgd 6) Commercial Harbor Facilities Available - No (The Squamscott River along Newfields is 4 feet deep at mean low water (mlw). Fixed spans at the B M Railroad bridge and State Highway 108 bridge, with vertical clearances at mhw of 5 feet and 9.5 feet, limit passage except for outboards. Within the last year a town landing has been constructed in Newfields, The facility is maintained by the town and takes on boats up to 20 feet. TOWN: NEWINGTON General Municipal_Data 1) Municipal Tax Rate (Equalized) $4.68/1000 evaluation 2) County Tax Rate (Equalized) - $24.73/1000 evaluation 3) Municipal Water Available - W/Portsmouth 4) Municipal Sewer Available - No (A sewer system for the industrial-waterfront section of Newington is being designed by Whitman and Howard, Inc4 of Boston, It is,still in the early planning stages.) 5) Number of Known Aquifers - 2 Newingtonis estimated groundwater potential: 1.36 mgd 6) Commercial Harbor Facilities Available Yes -.type of commercial activities and facilities available at existing harbors (see section on the Port of Portsmouth/Newington): .(The Great Bay Marina is located in Newington, on the Little Bay side of the General Sullivan Bridge. The facility consists of 45 moorings and at least 75 sl1ps for vessels.up to 50 feet.) TOWN: NEWMARKET General Municipal Data 1) Municipal Tax Rate (Equalized) $9.66/1000 evaluation 2) County Tax.Rate (Equalized) $24.73/1000 evaluation 3) Municipal Water Available Yes - sustainable yield of supply: I mgd - current daily use: 300,000 gd 4) Municipal Sewer Available -Yes - excess capacity: No (Newmarket's sewer system is overloaded when it rains, due to infiltration) 5) Number of Known Aquifers 6 - Newmarket's estimated groundwater potential: 1.17 mgd 6) Commercial Harbor Facilities Available No (The Great Bay has a channel 6 feet deep at m1w. Extensive tidal flats prevent boat launching from the shoreline during low tidal periods. The Lamprey River is 2 feet deep at m1w. Navigational difficulties result from shallow depths and rocks are reported in the upper section of the river between the lower and upper narrows. Newmarket has a town landing with a boat ramp. The Lamprey River Marina, a privately owned facility, is also on the river. The marina has slips for 15-20 recreational vessels and a small shipyard Is operated.) TOWN: NORTH HAMPTON General Municipal Data 1) Municipal Tax Rate (Equalized) $2.Q.74/1000 evaluation 2) County Tax Rate (Equalized) $24.73/1000 evaluation 3) Municipal Water Available - W/Hampton 4) Municipal Sewer Available - No 5) Number of Known Aquifers - 4 - North Hampton's estimated groundwater potential: .88 mgd 6) Commercial Harbor Facilities Available No TOWN: PORTSMOUTH General Municipal Data 1) Municipal Tax Rate (Equalized) $35.64/1000 evaluation 2) County Tax Rate (Equalized) $24.73/1000 evaluation 3) Municipal Water Available - Yes - sustainable yield of supply: 5.8 mgd - current daily use: 5.5 mgd (The Portsmouth municipal water system is currently operating at nearly full qapacity. The system is reported to have a maximum safe yield of 7 5 mgd, but not for a sustained period. The city is searching for new sources to @augm@ent the existing s@pply.) 4) Municipal Sewer Available-- Yes - excess capacity: No (The Portsmouth sewer system is currently operating at nearly full capacity. The present sewage treatment plant is designed to handle 1.5 mgd and actually handles closer to 2.5 mgd, the amount varying with weather conditions. There is talk of expanding the plant to handle 17.5 mgd.) - type of treatment: primary (facilities for secondary treatment are presently in the planning stages. It is expected to take.at least 10 years to 1) build facilities for the 10% of the sewage that is being put directly into.the river complete the separation of sewage from wastewater and 3) change treatment from primary to seconhr?y) 5) Number of Known Aquifers 1 - Portsmouth's estimated groundwater potential: 1.50 mgd 6) Commercial Harbor Facilities Available Yes - type of commercial activities and facilities availablelat existing harbors (see section on the Port of Portsmouth/Newington): (In addition to the 35-ft. deep Piscataqua River channel, the Army Corps of Engineers maintains a 6-ft. deep and 100-ft. wide channel from Little Harbor, through the Rye-New Castle drawbridge. 'feigh The channel extend's northerly between the mainland and Leach's Island to deep water near Shap Island. There is also a 6-ft. channel, 79- feet up Sagamore Creek with partially developed 3-acre anchorage strip of the same depth. There are 100-150 moorings in Little Harbor, limited to boats that draw no more than 3 feet at m1w. At high water boats can go through the center channel to the Sagamore Creek. Mike's Marina, on the Sagamore Creek takes on 50-60 foot tos drawing 5-6 feet.) '61 VERT@ C L. e FT. (CF. C R) G R NT- (2 SEAVEY ISLAND 28 50 19"@ 0 OSTACK @H- - 2S - 33 (3 38 43 5 'ns RESTRICTLED AREA-----"-,\ 90 1 64 50. 36 207.6 Pat 6 (set note A) - 36.V -2ri ZK 37 STA _@4- C 2 IUV D@ 1- @Atl 7g - 55 -(?69 40@ CL. 15 52 )L-LIFT BRID E hi)@ 40 HOR. CL. 2 T. 4soci 57 31 Causeway @acu@ "-' @jj or I 'M Hs Rat 5WUAKE 0 VERT. CL. 19 FT. CLOSED C RCH SPI RCH 70 t OWER 0) %,VERT. CL. 150 FT. OPEN 5 50 43 71 76 3 0 t. FIXED BRWGE@ 62 in _I 54 P, f) V' 17 HOR, CL. 73 35 53 -75 70 3b 7 62 --- 36---@73 N E Int G 6$ec tIblt -T2 I Svc, 4� 72 K 72 2 (3'c- Ith 'if to) n 61 5 oil I 3 -E E 48 FT le 1 F 4 T NOR. CL. 60 FT. 22 /15 PE C V AT. CLJO FT. 7 PORTSMOUTH 11 7 2 13 v N\ CF5"' 15 3 9 AUTK T 2 2 4 04!- A4 1"N -'2111 R 0P 50%- C LITTLE HARBOR W ; The controlling depth was 6 feet fo a width LARGEST of 75 feet from the channel entranc (43-03- CUPOLA 44 27"N. 70*43'43*'W.) to the fork@ thence 6 feet for -ea a a width of 60 feet in the north channel, and 6 4 79@,f 2;1- BASCULE BRIDGE C oamore Creek feet for a width of 60 feet in Sa. A. - C . 29 FT@ "I, 1"'@ VERT. CL. 1Z FT to the fixed bridge, and 6 feet in the anchorage R centered in 43'03'211'N. 70*44'31"W. A4 Sagamore Der.. 1970- March 11971 5' -14 Buoys are equipped R with Radar Reflectors. 1P. 4 I.- .%@ 'IkC-/7" 11 C-1 9 0 BRIDGE CL. 153 FT, LIT VERT. CL. 7 FT. 0 10 lb HARBOR 3 OVHD CAB 4 CL 16 FT REP ...... C-0 .......... ............. 2 '14 3@- C 2 TOWN: ROLLINSFORD General Municipal_Data 1) Municipal Tax Rate (Equalized) $30.55/1000 evaluation 2) County Tax Rate (Equalized) - $25.82/1000 evaluation d:@ 3) Municipal Water Available - Yes - sustainable yield of supply: 100,000 gd - current daily use: 92,000 gd 4) Municipal Sewer Available - Yes exce'ss capacity: 80,000 gd type of treatment: secondary (oxidation ditches) 5) Number of Known Aquifers - I Rollinsford's estimated groundwater potential: 0 6) Commercial Harbor Facilities Available - No (The lower 1.5 miles of the Salmon Falls River have a depth of 4 feet at m1w, but the river becomes shallower upstream. A fixed span highway bridge with a 3 ft. vertical clearance' crosses the Salmon Falls River one mile from its mouth at the confluence of the Cocheco and Piscataqua Rivers. The clearance is inadequate to allow boat passage except for outboards.) TOWN: RYE General Municipal Data 1) Municipal Tax Rate (Equalized) $16.34/1000 evaluation 2) County Tax Rate (Equalized) - $24.73/1000 evaluation 3) Municipal Water Available W/Portsmouth & W/Hampton 4) Municipal Sewer Available No 5) Number of Known Aquifers 3 Rye's estimated groundwater potential: 3.10 mgd 6)Commercial harbor facilities available- Yes -type of commercial activities and facilities available at existing harbors: Rye Harbor is essentially a rectangular area, fairly sheltered, approximately five miles south of Portsmouth. There are protective break- waters at the entrance. The Army Corps of Engi- neers has dredged a 10 foot deep entrance chan- nel and access channel 8 feet deep to the head of the harbor. There are ten acres of anchorage area 8 feet deep over a five acre area at the south side of the harbor and 6 feet deep over a five acre area at the north side. There is not much current since there are only two small streams feeding into the harbor. The harbor is used by recreational crafts as well as lobstering and fishing boats. During the summer months approxiamately 120 boats are moored in the harbor; 80 are pleasure vessels, 30 lobster boats, 2 draggers, 2 gillnetters and 6 party baots. There is a commercial pier for unloading fish, a float for pleasure boats and a launching ramp from which an average of 325 boats are launched each summer month. -potential for expanding existing harbor facil- ities or for the extablishment of new harbor facilities: The governor has appointed a committee to study the feasibility of improving Rye Harbor. A plan to spend $600-700,000 to dredge the harbor is being considered. TOWN: SEABROOK General Municl2al Data Municipal Tax Rate (Equalized) $20.64/1000 evaluation 2) County Tax Rate (Equalized) $24.73/1000 evaluation 3) Municipal Water Available Yes sustainable yield of supply: .1.9 mgd current daily use: winter - .75 mgd summer - I mgd 4) Municipal Sewer Available No 5) Number of Known Aquifers - 2 Seabrook's.estimated groundwater potential: 1,22 mgd; at maximum sustained yield in summer 6) CommercialHarbor Facilities Available -Yes. type of commercialactivities and facil.ities available at existing harbors: Entrance to Seabrook and Hampton Harbors is between two rock jetties. The channel is approximately 4 feet deep at mean low water NO and 150 feet wide. A bridqe connecting Hampton and Seabrook is right inside of the entrance. It has a 17-foot clearance at average tide. Seabrook Harbo Ir is located on the left side of the rectangular lagood behind the barrier beaches of Hampton and Seabrook. It is a small cove where the current isn't strong (in contrast to Hampton Harbor)., Thirty of the forty boats in the water each summer are used for commercial. fishing. During the winter 20-25 boats are left in the harbor. potential for expanding existing harbor facilities or for the establishment of new-harbor facilities: A $1.5 mill-ion barge dock is under construction in Seabrook Harbor. 'This facility is part of the Seabrook nuclear power plant-projoct. The harbormaster reports that 65 foot barges will be using the completed dock. TOWN: MATHAM General Municipal Data. 1) Municipal Tax Rate (Equalized) $17.94/1000 evaluation 2) County Tax Rate (Equalized) $24.73/1000 evaluation 3) Municipal Water Available - No 4) Municipal Sewer Available No 5) Number of Known Aquifers 3 Strathamis estimated groundwater potential: 1.5 mgd 6) Commercial Harbor Facilities Available No (The Squamscott River alongside Strathaim is 4feet deep at m1w. Fixed spans at the B & M Railroad bridge and State Highway 108 bridge, with vertical clearances at mhw of 5 feet and 9.5 feet, limit passage except for outboards. There are two boat ramps in Stratham, Chapman's Landing and the Stratham Town Landing.) PARCEL DATA PRO M-ARY/SECON, DARY ZONE @ources of Parcel Data for Communities in the Primary and Secondary Coastal Zones: A. Site- interpreted from the New Hampshire Coastal Zone Study Land and Water Use Capability Map Size- delineated area measured with a planimeter Current Status 1@ Existing Land Use- New Hampshire Coastal Zone Study Existing Land.Use Map 2 Zoning Status- Information taken from the Stra@ford_Reqion C?mposite Zoning Map and the comz. posite zoning map in !'Local Plannin� and Zoning- Repo@t #4.' D. Land and Water Resources 1 Land Capability- New Hampshire Coastal Zone Study Land and Water Use Capability Map 2@ 'Adjacent to surface tidal waters, distance- New Hampshire Coastal Zone Study Land and Water Use Capability Map 3) Tidal Water Capabilities- New Hampshire Coastal Zone Study Land and Water Use Capability Map, 8 Adjacent to surface fresh water, distance- soil surveys of Strafford and Rockingham Counties 5 Adjacent to Aquifer, distance- the Army Corps of Engineers report "Southeast New Hampshire Water Supply Study, Estimated Demands and Resource Availability" map p. 43 and the New Hamp- ,shire Coastal Zone Study Areas of Particular Concern Map E. Utilities and Services l)-Distance to nearest major water hookup, tow6s,it serves- New Ham'shire'Coastal Zone Study p quadrant map of the Water Systems 2) Distance to nearest sewer hookup, towns it serves,- New Hampshire Coastal Zone Study quadrant map of the Sewer Systems 3) Utilities Available, distance to nearest major transmission line and type of line- Public Service Company of New Hampshire and the New Hampshire Coastal Zone Study Existing Land Use Map 4) Gas Pipeline; distance to and type of nearest gas mainj distance to Granite State Gas Trans- mission line- Northern Utilities Inc. Allied Gas Division F. Transportation Highway; type of road which services site and distance to primary road- highway maps 2) Railroad; distance to active rail line- highway maps ..*Due to the scale of the New Hampshire-.Coastal1one Study,Existing Land Use Map, numerous scattered residential land uses were not mapped. Therefore, this use may not appear as one of the existing uses listed under the Existing Land Use category, even though they.clearly exist. W-1 RAILROADS EDUCATIONAL AND CORRECTIONAL BOUNDARIES INSTITUTIONS RAILROAD (ANY NUMBER OF TRACKS USED BY STATE A SINGLE OPERATING COMPANY) COUNTY SCHOOL HOUSE RAILROADS IN JUXTAPOSITION (TWO OR MORE I OWN PUBLIC L113RARY TRACKS OF SEPARATELY OPERATED COM@ PANIES ON ADJACENT RIGHTS-OF-WAY) ............. RA I L RO A 0PRIVATELY OWNED (NARROW GAUGE) 4:@ NATIONAL OR STATE FOREST OR RESERVATION TOWN, GRANGE, OR OTHER HALL. (ADD LETTERS T, G, OR 0 TO DESIGNATE KIND) RAILROAD (SERVICE ABANDONED) CONSERVATION AND RECREATION RAILROAD STATION CORRECTIONAL INSTITUTION 0 OBSERVATION OR LOOKOUT IOWER RAILROAD CROSSINGS A PICNIC GROUND PUBLIC SERVICE FACILITIES POST OFFICE GRADE CROSSING PLAYGROUND, GALLFIELD, ETC. BATHING BEACH OR SWIMMING POOL e U 5 BORDER PORT OF ENTRY TOURIST CAMP OR MOTEL WATER SUPPLY STAND PIPE RAILROAD ABOVE If- RAILROAD BELOW C DRIVE-IN THEATRE POWER STATION GUARD OF? RANGER STATION (NOT PERMANENTL .Y dl.... RADIO STATiON e OCCUPIED) 13 @HIGHWAY GARAGE AIRPORTS FISH HATCHERY 03 FIRE STATION MILITARY FIELD GOLF COURSE (m DUMP ATHLETIC FIELD FIELD FOR COMMERCIAL OR GENERAL MISCELLANEOUS MAP FEATURES L_ PUBLIC USE FAIR GROUND, RACE COURSE, SPEEDWAY POINTS BETWEEN WHICH DISTANCES ARE MEASURED AIRWAY. LIGHT BEACON A@ CAMP OR LODGE SEAPLANE BASE, CIVIL FARM UNITS, DWELLINGS, ETC. OVERFLOW LANE) NAVIGATION @SE us, ROAD SYSTEM DESIGNATION a FAR UNIT LIGHT HOUSE TRUNK LINE HIGHWAYS a DWELLING OTHER THAN FARM ALL OTHER PUBLIC HIGHWAYS DRAINAGE ED GROUPS OF DWELLINGS CLOSELY SPACED FAP FEDERAL AID PRIMARY SYSTEM NARROW STREAM III DWELLING AND POST OFFIC IE FEDERAL AID SECONDARY SYSTEM T"-'- WIDE STREAM OWELLIN@ AND STORE DWELLING AND FILLING STATION FEDERAL AID URBAN SYSTEM DAM WITHOUT ROAD SEASONAL DWELLING UNITED STATES HIGHWAY SYSTEM STRUCTURES SEASONAL DWELLINGS CLOSELY SPACED HIGHWAY BRIDGE (ANY TYPE OVER iillb HOTEL, INN STATE HIGHWAY NUMBERED SYSTEM 20' IN @FAP(OR FA ) LENGTH) A 6 CHURCH END OF FEDERAL AID DESIGNATED ROUTE HIGHWAY BRIDGE (ANY TYPE 20. OR LESS, HOSPITAL BUT MORE THAN 10' IN LENGTH) CEMETERY SMALL BRIDGES CLOSELY SPACED TRAFFIC CIRCLE 16. i& CLOVER LEAF WATER STORAGE FOR FIRE PROTECTION DRAWBRIDGE GROUP OF MIXED CULTURAL FEATURES ROADWAY FEATURES CLOSELY SPACED NATURAL FEATURES DIVIDED HIGHWAY WITH FULL CONTROL OF ACCESS PROMINENT ELEVATION INDUSTRIAL DIVIDED HIGHWAY WITH PARTIAL CONTROL OF ACCESS CITY AND VILLAGE CENTERS (2) STORE OR SMALL BUSINESS PAVED ROAD 0 STATE CAPITAL BUSINESS AND POST OFFICE BITUMINOUS SURFACED ROAD 0 COUNTY SEAT L BUSINESS AND FILLING STATION GRAVEL SURFACED ROAD FACTORY OR INDUSTRIAL PLANT GRADED AND DRAINED ROAD OTHER CITIES AND VILLAGES SAW MILL (STATIONARY) MINE UNIMPROVED ROAD DELIMITED URBAN AREA PRIMITIVE ROAD OIL STORAGE TANKS FILLING STATION SUGAR HOUSE GRAVEL PIT OUARRY *Base Map Key At *Town: ve VM. U-7 197W@ F- 4-1 W I flo hi Am Hot. a. 40 vw. a. TOWN: DOVER A. Site d-l B. Size Approximately 1250 acres C. Current Status 1) Existing Land Use: Agri cul tural - 15% 2) Zoning Status: Agricultural 100% Abandoned Land - 5% Woodland 75% Wetlands 5% Residential less than 5% D. Land and Water Resources 1) Land Capability: Excellent 50% Fair - 20% 2) Adjacent to surface tidal water No Good 10% Poor - 20% Distance 2.5 miles 3) Tidal Water Capability 4 (Cocheco River) 4) Adjacent to surface fresh water Yes Distance 'on site (Reyners Brook) 5) Adjacent to Aquifer Yes Distance on site E. Utilities and Services 1) Distance to nearest major water hookup on site -What town(s) does this hookup serve Dover 2) Distance to nearest sewer hooku .4 miles p What town(s) does this hookup serve Dover 3) Utilities Available; Distance to nearest major transmission line 1.56 miles Type of transmission line 34.5 KV line 4) Gas Pipeline; Distance to nearest gas main .38 miles Type of gas main - 2 inch high pressure gas main Distance to Granite State Gas transmission line 1.13 miles F. Transportation 1) Highway; Type of road which services or is nearest to site primary (Spaulding Turnpike) Distance to primary road on site 2) Railroad; Site serviced by rail No Distance to active rail line 2 miles TOWN: DOVER A. Site d-2 B. Size Approximately 155 acres C. Current Status 1) Existing Land Use: Agricultural - 20% 2) Zoning Status: Low Density Residential - 90% Abandoned Land - 20% Agricultural - 10% Woodland - 40% Residential 20% D. Land-and Water Resources 1) Land Capability: Excellent 55% Fair - 15% .2) Adjacent to surface tidal waters No Good -.10% Poor - 20% Distance - 1.75 miles 3) Tidal Water Capability 4 (Cocheco River) 4) Adjacent to surface fresh water No Distance .05 mile (Indian Brook) 5) Adjacent to aquifer Yes .3 miles (Cocheco River) Distance - site borders an aquifer Utilities and Services Distance to nearest major water hookup on site What town(s@ does this.hookup serve - Dover 2) Distance to nearest.sewer hookup Adjacent to site What town(s) does this hookup serve Dover 3) Utilities Available; Distance to nearest major transmission line 1.25 miles Type of transmission line 34.5 KV line 4) Gas pipeline; Distance to nearest gas main .5 miles Type of gas main - 2 inch high pressure gas main Distance to Granite State Gas transmission line 1.25 miles, F. Transportation 1) Highway; Type of road which services or is nearest to site town roads Distance to primary road adjacent to site 2) Railroad; Site serviced by rail No Distance to active rail line 1.25 miles TOWN: DOVER A. Site d-3 B. Size@ - Approximately,405 acres C. Current Status 1) Existing Land Use: Agricultural 30% 2) Zoning Status: Low Density Residential 45% Abandoned Land - 35% Agricultural 50% Woodland - 30% Medium Density Residential 5% Residential 5% D. Land and Water Resources 1) Land Capability: Excellent 20% Fair - 5% 2) Adjacent to surface tidal water Yes Good - 60% Poor - 15% 3) Tidal Water Capability 4 (Cocheco River) 4) Adjacent to surface fresh water Yes Distance on site 5) Adjacent to Aquifer - Yes Distance - site borders an aquifer E. Utilities and Services 1) Distance to nearest major water hookup on site What town(s) does this hookup serve Dover 2) Distance to nearest sewer hookup - on site What town(s) does this hookup serve Dover' 3) Utilities Available - Distance to nearest major transmission line on site.. Type of transmission line 34.5 KV line 4) Gas Pipeline; Distance to nearest gas main - on site Type of gas main - Granite State Distance to Granite State Gas transmission line on site F. Transportation.. 1) Highway; Type of raod which services or is nearest to site town roads Distance to primary road,- .5 miles (State Highway 16) 2) Railroad; Site serviced by rail - No Distance to active rail line .75 miles TOWN: DOVER A. Site d-4 B. Size Approximately 110 acres C. Current Status 1) Existing Land Use: Abandoned Land 60% 2) Zoning Status: Agricultural 100% Woodland 40% D. Land and Water Resources 1) Land Capability: Excellent 80% Fair 0 2) Adjacent to surface tidal waters Yes Good 0. Poor 20% 3) Tidal Water Capability 4 (Salmon Falls River) 4) Adjacent to surface fresh water Yes, Distance on site 5) Adjacent to aquifer - No Distance 1.13 miles E. Utilities and Services 1) Distance to nearest major water hookup .68 miles What town(s) does this hookup serve Dover 2) Distance to nearest sewer hookup 1025 miles What town(s),does this hookup serve Dover 3) Utilities Available Distance to nearest major transmission line .44 miles Type of transmission line 34.5 KV line 4) Gas Pipeline; Distance to nearest gas.main .75 miles Type of gas main - Granite State gas line Distance to Granite State gas transmission line .75 miles F. Trans2ortation 1) Highway; Type of road which services or is nearest to site - secondary r ad Distance to primary'road - 2.25 miles (State highway 16, State highway 93. 2) Railroad; Site serviced by rail No Distance to nearest active rail line - 1.75 miles. TOWN: DOVER A. Site d-5 B. Size Approximately 270 acres C. Current Status 1) Existing Land Use: Abandoned Land - 35% 2) Zoning Status: Agricultural 100% Woodland - 60% Agricultural - 5% .D. Land and Water Resources 1) Land Capability: Excellent 40% Fair 20% Adjacent to surface tidal water -,Yes Good 20% Poor 20% 3) Tidal Water Capability - 4 (Piscataqua River, 4) Adjacent to surface fresh water Yes Cocheco River) Distance on site 5) Adjacent to Aquifer Yes Distance - Site borders an aquifer E. Utilities and Services 1) Distance to nearest major water hookup .4 miles What town(s) does this hookup serve - Dover Distance to nearest sewer hookup .93 miles What town(s) does this hookup serve - Dover 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line - 345 KV line, 115 KV line. 4) Gas Pipeline; Distance to nearest.gas main on site Type of gas main - Granite State gas line Distance to Granite State gas transmission line on site F. Transportation 1) Highway; Type of road which services or is nearest to site town roads Distance to primary road .75 miles (State Highway 16) 2) Ra-ilroad; Site serviced by rail No Distance to active rail line 2 miles TOWN: DOVER A. Site d-6 B. Size Approximately 100 acres C. Current Status 1) Existing Land Use:- Agricultural 35% 2) Zoning Status: Agricultural 100% Residential 5% Woodland 60% D. Land and Water Resources 1) Land Capability: Excellent 60% Fair - 20% 2) Adjacent to surface tidal waters No Good 0 Poor - 20% Distance - 2.5 miles 3) Tidal Water Capability 4 (Cocheco River) 4) Adjacent to surface fresh water No Distance .13 (Cocheco River) 5) Adjacent to Aquifer No Distance .25 miles Ei Utilities and Services 1) Distance to nearest major water hookup .2 miles What town(s) does thi's hookup serve Dover 2) Distance to nearest sewer hookup - 3.25 miles What town(s) does this hookup serve - Dover 3) Utilities Available; Distance to nearest major transmission line 2.75 miles Type of transmission line 34.5 KV line 4) Gas Pipeline; Distance to nearest gas main - 1.75 miles Type of gas main - 3 inch high pressure gas main Distance to Granite State Gas transmission line - 2.81 miles F. Transportation 1) Highway; Type of road which services or is nearest to site - town road Distance to primary road - 1.25 (Spaulding Turnpike) 2) Railroad; Site serviced by rai.l. No Distance to active rail line 2 miles TOWN: DOVER A. Site d-7 B. Size Approximately 225 acres Co Current Status 1) Existing Land Use: Abandoned Land - 10% 2) Zoning Status: Low Density Residential - 60% Woodland - 40% Restricted Industrial - 40% Agricultural - 45% Residential - 5% D. Land and Water Resources 1) Land Capability: Excellent 50% Fair - 20% 2) Adjacent to surface tidal waters No Good - 0 Poor - 30% Distanee - IMile 3) Tidal Water Capability - 4 (Bellamy River) 4) Adjacent to surface fresh water Yes Distance on site 5) Adjacent to Aquifer.- No Distance - .5 miles E. Utilities and Services 1) Distance to nearest major water hookup on site What,town(s) does this hookup serve - Dover 2) Distance to nearest sewer hookup - on site What town(s) does-this hookup serve - Dover 3) Utilities Available; Distance to nearest major transmission line 1.25 miles Type of transmission line - 345 KV line 4) Gas Pipeline; Distance to nearest gas main - adjacent to site Type of gas main - 3 inch high pressure gas main Distance to Granite State Gas transmission line 1.75 miles F. Transportation 1) Highway; Type of road which services or is.nearest to site secondary road (State highway 9). Distance to primary road - adjacent to site (Spaulding Turnpike) 2) Railroad; Site serviced by rail -,Yes Distance to active rail line on site TO WN4 DOVER. A. Site d-8 B. Size Approximately 145 acres C. Current Status 1) Existing Land Use: Woodland 95% 2) Zoning Status: Agricultural 100% Wetlands 5% D. Land and Water Resources 1) Land Capability: Excellent 50% Fair -0 2) Adjacent to surface tidal waters No Good - 0 Poor -50% Distance - .5 miles 3) Tidal Water Capability - 4 (Bellamy River) 4) Adjacent to surface fresh water Yes Distance on site 5) Adjacent to Aquifer - Yes Distance site borders an aquifer E. Utilities and Services 1) Distance to nearest major water hookup omsite What town(s) does this hookup serve Dover 2) Distance to nearest sewer hookup .5 miles What town(s) does this hookup serve Dover 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line 34.5 KV line, 115 KV line, 345 KV line 4) Gas Pipeline; Distance to nearest gas main Adjacent to site Type of gas main - Granite State Gas line Distance to Granite State Gas transmission line adjecent to site F. Transportation 1) Highway; Type of road which services or is. nearest to site - rimary road (State highway 16) Distance to primary road - Adjacent to site (State highway 116@ 2) Railroad; Site serviced by rail - No Distance to active rail line 1.38 miles TOWN: DOVER A. Site d-9 Size Approximately 270 acres C. Current Status 1) Existing Land Use: Agricultural 40% 2) Zoning Status: Agricultural 75% -Woodland 50% Low Density Residential 10% Wetlands Medium Density Residential -15% D. Land and Water Resources 1) Land Capability: Excellent 25% Fair - 20% 2) Adjacent to surface tidal water No Good - 25% Poor - 30% Distance - .75 miles 3) Tidal Water Capability.- 4 (Bellamy River) 4) Adjacent to surface fresh water Yes Distance -on site 5) Adjacent to Aquifer - Yes Distance site borders an aquifer E. Utilities and Services 1) Distance to nearest major water hookup on site What town(s) does this hookup serve Dover 2) Distance to nearest sewer hookup on site What town(s) does this hookup serve Dover 3) Utilities Available - Distance to nearest major transmission line on site Type of transmission line 34.5 KV line, 115 KV line, 345 KV line 4) Gas Pipeline; Distance to nearest gat main - .81 miles Type of gas main - 4 Inch high pressure gas main Distance to Granite State Gas Transmission line - 1.5 miles F. transportation 1) Highway; Type of road which services or is nearest to site - Secondary road (State highway 108) Distance to primary road - 1 mile (Spaulding Turnpike)- 2) Railroad; Site serviced by rail No Distance to active rail line 1 mile TOWN: DOVER A. Site d-10 B. Size Approximately 180 acres C. Current Status 1) Existing Land Use: Woodland - 90% 2) Zoning Status: Agricultural - 80% Residential - 5% Low Density Residential - 10% Abandoned Land - 5% Restricted Commercial - 10% .D. Land and Water Resources 1) Land Capability: Excellent 40% Fair - 35% 2) Adjacent to surface tidal water No Good - 20% Poor - 5% Distance - 0.5 mile 3) Tidal Water Capability - 3 (Bellamy River) 4) Adjacent to surface fresh water Yes Distance on site 5) Adjacent to Aquifer Yes Distance - .25 miles E. Utilities and Services 1) Distance to nearest major water hookup on site What town(s) does this hookup serve - Dover 2) Distance to nearest sewer hookup - adjacent to site What town(s) does this hookup serve -,Dover .3) Utilities Available; Distance to nearest major transmission line adjacent to site Type of transmission line 34.5 KV line, 115 KV line 4) Gas Pipeline- Distance to nearest gas main - I '13 miles Type of gas @ain - Granite State gas line Distance to Granite State Gas Transmission line 1.13 miles Fe Transportation 1) Highway; Type of road which services or is nearest to site town roads Distance to primary road 1.75 miles (Spaulding Turnpike) 2) Railroad; Site serviced by rail - No Distance to active rail line 2.25 miles *Town; -roujr) pu; scomme ctqi& WtscoLe gri Boat, Vv FA 41- Al NP F&P 0 ,A @/Y Ste, Boo RAmp Vv- jOpULp"V%ON 1013 @970 'Foils PREY Qd My .ts :m m @el tr TOWN: DURHM A. Site du-I B. Size Approximately 320 acres C. Current Status 1) Existing Land Use: Woodland -60%. 2) Zoning Status: Restricted Commercial 100% Agricultural - 40% D. Land and Water Resources 1) Land Capability: Excellent - 15% Fair - 25% 2) Adjacent to surface tidal water No Good - 30% Poor - 30% Distance - 2.5 miles 3) Tidal Water Capability - 3 (Oyster River) 4) Adjacent to fresh water Yes Distance on site, 5) Adjacent to Aquifer No Distance - .94 miles E. Utilities and Services 1) Distance to nearest major water hookup .68 miles What town(s) does this hookup serve !- Durham 2) Distance to nearest sewer hookup - .13 miles What town(s) does this hookup serve - Durham 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line - 345 KV line, 115 KV line 4) Gas Pipeline; Distance to nearest gas main - 3.25 miles. Type of gas main - 3 inch high pressure gas main Distance to Granite State Gas Transmission line - 5 miles F. Trans2ortation, 1) Highway; Type of road which services or is nearest to site primary road (State Highway 155) Distance to primary road - on site 2) Railroad; Site serviced by rail No Distance to active rail line 1 mile TOWN: DURHAM A. Site du-2 B. Size Approximately 110 acres C. Current Status 1) Existing Land Use: Woodland - 65% 2) Zoning Status: Medium Density Residential 100% Agricultural - 35% D. Land and Water Resources 1) Land Capability: Excellent 70% Fair - 15% 2) Adjacent to surface tidal water- No Good - 10% Poor - 5% Distance - 1.5 miles 3) Tidal Water Capability 3 (Oyster River) 4) Adjacent to fresh water Yes, Distance .06 miles (Durham Reservoir) 5@ Adjacent to Aquifer - No Distance - 1.25 miles E. Utilities and Services 1) Distance to nearest major water hookup .1 miles What town(s) does this hookup serve - Durham 2) Dfstance to nearest sewer hookup - .1 miles What town(s) does this hookup serve - Durham 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line - 34.5 KV line 4) Gas Pipeline; Distance to nearest gas main 3 miles Type of gas main - 3 inch high pressure gas main Distance to Granite State Gas transmission line - 4.44-miles F4 Transportation 1) Highway; Type of road which services or.is nearest to site primary road (US Highway 4) Distance to primary road - Adjacent to site (US Highway 4) 2) Railroad; Site serviced by rail - No Distance to active rail line .13 miles TOWN: DURHAM A. Site du-3 B. Size - Approximately 155 acres C. Current Status 1) Existing Land Use:. Woodland - 60% Zoning Status: High Density Residential - 55% Abandoned Land - 100/ Medium Density Residential - 45% Agricultural - 20% Residential - 10% D. Land and Water Resources 1) Land Capability: Excellent - 35% Fair.- 10% 2) Adjacent to surface tidal water No Good - 15% Poor - 40% Distance - .75 miles 3) Tidal Water Capability - 3 (Oyster River) 4) Adjacent to fresh water - Yes Distance on site (Beards Creek, Littlehole Brook) 5) Adjacent to Aquifer - No Distance - 1.13 miles E. Utilities and Services 1) Distance to nearest major water hookup on site What town(s) does this hookup serve Durham 2) Distance to nearest sewer hookup - on site What town(s) does this hookup serve - Durham 3) Utilities Available; Distance to nearest transmission line .63 miles Type of transmission line - 34.5 KV line 4) Gas Pipeline; Distance to nearest gas main - 2.5 miles Type of gas main - 3 inch high pressure gas main Distance to Granite State Gas transmission line 3.5 miles F. Transportation 1) Highway; Type of road which services or is nearlest to site primary road (US Highway 4) Distance to primary road - on site 2) Railroad; Site serviced byrail - No Distance to active rail line - .43 miles TOWN: DURHAM A. Site du-4 B. Size Approximately 255 acres C. Current Status 1) Existing Land Use: Woodland - 30% Zoning Status: Restricted Commercial - 30% Agricultural - 60% Medium Density Residential - 70% Abandoned Land - 5% Urban/Residential - 5% D. Land and Water Resources 1) Land Capability: Excellent - 10% Fair - 0 2) Adjacent to surface tidal water No Good 65%- Poor - 25% Distance - 1.5 miles 3) Tidal Water Capability - 3 (Oyster River) 4) Adjacent to fresh water - Yes Distance on site (College Brook) 5) Adjacent to Aquifer - No Distance - 1.19 miles E. Utilities and Services. 1) Distance to nearest major water hookup .05 miles What town(s) does this hookup serve - Durham 2) Distance to nearestsewer hookup - on site What town(s) does this hookup serve - Durham 3) Utilities Available - Distance to nearest major transmission line .19 miles Type of transmission line - 34.5 KV line 4). Gas Pipeline; Distance to nearest gas main - 3.44 miles Type of gas main - 3 inch high pressure gas main Distance to Granite State gas transmission line - 5 miles F. Transportation 1) Highway; Type of road which services or is nearest to site Secondary road (State Highway 155A) Distance to primary road - Adjacent to site.(US Highway 4) 2) Railroad; Site serviced by rail - No Distance to active rail line - .25 miles TOWN: DURHAM A. Site - du-5 B. Size - Approximately 265 acres C. Current Status 1) Existing Land Use: Agricultural - 70% 2) Zoning Status: Agricultural 40% Woodland - 20% Medium Density Residential 60% Abandoned Land - 10% D. Land and Water Resources 1) Land Capability: Excellent - 35% Fair - 15% 2) Adjacent to surface tidal water No Good - 10% Poor - 40% Distance - 2.25 miles 3) Tidal Water Capability --.3 (Oyster River) 4) Adjacent to fresh water - Yes Distance .06 miles (Lamprey River) 5) Adjacent to Aquifer - Yes Distance - site borders an aquifer E. Utilities and Services. 1) Distance to nearest major water hookup .85 miles What town(s) does this hookup serve - Durham 2) Distance to nearest sewer hookup - 1.4 miles What town(s) does this hookup serve - Durham 3) Utilities Available; Distance to nearest major transmission line - .31 miles Type of transmission line 34.5 KV line 4) Gas Pipeline; Distance to nearest gas main 5.38 miles Type of gas main - 3 inch high pressure gas main Distance to Granite State Gas transmission line - 5.88 miles F. Transportation 1) Highway; type of road which services or is nearest to site town road Distance to primary road - 2.5 miles (US Highway 4) 2) Railroad; Site serviced by rail - No Distance to active rail line .5 miles TOWN: DURHAM A. Site du-6 B. Size Approximately 75 acres C. Current Status 1) Existing Land Use: Agricultural - 70% 2) Zoning Status: Low Density Residential 100% Woodland - 20% Wetlands - 10% D. Land and Water Resources 1) Land Capability: Excellent 65% Fair 15% 2) Adjacent to surface tidal waters Yes Good - 0 Poor- 20% 3) Tidal Water Capability - 3 (Oyster River) 4) Adjacent to fresh water - Yes Distance borders site (Horsehide Brook) 5) Adjacent to Aquifer - No Distance - 2.25 miles E. Utilities and Services 1) Distance to nearest major water hookup .3 miles What town(s) does this hookup serve - Durham 2) Distance to nearest sewer hookup .55 miles What town(s) does this hookup serve - Durham 3) Utilities Available; Distance to nearest major transmission line .56 miles Type of transmission line - 34.5 KV line 4) Gas Pipeline; Distance to nearest gas main - 3.31 miles Type of gas main - Granite State Gas line Distance to Granite State Gas Transmission line - 3.31 F. Transportation 1) Highway; Type of road which services or is nearest to site town road Distance to primary road - 1.75 miles (US Highway 4) 2) Railroad; Site serviced by rail - no Distance to active rail line 1.5 miles 'e 7-- a*b v 41 f 19 01006Y Hop'. CL ..lie" Xg U (ON@'% D.4m 1.8 "6 ea @r ftsef oif EXETE tR 02 POP. 6,439 @Z .02 oic sa 'Man 0 41 12 ime MIS a-v AD ro K6N5i(vGTo 7'W" TOWN: EXE TER A., Site - e-1 B. Size - Approximately 275 acres C. Current Status 1) Existing Land Use: Woodland - 50% 2) Zoning Status: Residential-Agricultural 100% Agricultural - 2 01" 10 Residential - 10% Abandoned Land - 15% Wetlands - 5% D. Land and Water Resources 1) Land Capability: Excellent - 4b% Fair - 30% 2) Adjacent to surface tidal water - No Good - 10% Poor - 201, Distance - 2.5 miles 3) Tidal Water Capability - 4 (Squamscott River) 4) Adjacent to surface fresh water - Yes Distance on site,(Fresh River) 5) Adjacent to Aquifer - No Distance - 2.19 miles E. Utilities and Services 1) Distance to nearest major water hookup 1.6 miles What town(s) does this hookup serve - Exeter 2) Distance to nearest sewer hookup - 1.9 miles What town(s) does this hookup serve - Exeter 3) Utilities Available; Distance to nearest major transmission line onsite Type of transmission line - 115 KV line 4) Gas Pipeline; Distan 'ce to nearest gas main - 2.25 miles Type of gas main - Granite State Gas Line Distance to Granite State Gas Transmission Line - 2.25 miles F. Transportation 1) Highway; Type of road which services or is nearest to site town roads Distance to primary.road .5 miles (State Highway 101) 2) Railroad; Site serviced by rail - No Distance to active rail line - 2.38 miles TOWN: EXETER A. Site e-2 B. Size Approximately 100 acres C. Current Status 1) Existing Land Use: Wetlands - 20% 2) Zoning Status: Residential-Agricultural 100% Woodland - 65% Abandoned Land - 15% D. Land and Water Resources 1) Land Capability: Excellent - 55% Fair - 0 2) Adjacent to surface tidal water - No Good - 0 Poor - 45% Distance - 3.13 miles 3) T.idal Water Capability - 4 (Squamscott River) 4) Adjacent to surface fresh water - Yes Distance on site 5) Adjacent to Aquifer - No Distance - 2.69 miles E. Utilities and Services 1) Distance to nearest major water hookup 1.63 miles What town(s) does this hookup serve - Exeter 2) Distance to nearest sewer hookup - 2 miles What town(s) does this hookup serve - Exeter. 3) Utilities Available; Distance to nearest major transmission line -@'on site Type of transmission line - 115 KV line 4) Gas Pipeline" Distance to nearest gas main - 2.25 miles Type of gas main Granite State Gas Line Distance to Granite State Gas transmission line 2.25 miles F. Transportation 1) Highway; Type of road which services or is nearest to site primary road (State Highway 101) Distance to primary road - on site 2) Railroad; Site serviced by rail - No Distance to active rail line 2.75 miles TOWN: EXETER A. Site e-3 B. Size Approximately 215 acres C. Current Status 1) Existing Land Use: Woodland - 95% 2) Zoning Status: Residential-Agricultural 100% Residential - 5% D. Land and Water Resources 1) Land Capability: Excellent 10% Fair - 10% 2) Adjacent to surface tidal water - No Good - 60% Poor " 20% Distance - 2.25 miles 3) Tidal Water Capability - 4 (Squamscott River) 4) Adjacent to surface fresh water - Yes Distance on site (Dudley Brook) 5) Adjacent to Aquifer - No Distance - 1.13 miles E. Utilities and Services 1) Distance to nearest major water hookup 1.23 miles What town(s) does this hookup serve - Exeter 2) Distance to nearest sewer hookup - 1.33 miles What town(s) does this hookup serve - Exeter 3) Utilities Available; Distance to nearest major transmission line 1.13 miles Type of transmission line - 115 KV line 4) Gas Pipeline; Distance to nearest gas main - 1.06 miles Type of gas main - Granite State Gas Transmission Line Distance to Granite State Gas Transmission line 1.06 miles F. Transportation 1) Highway; Type of road which services or is nearest to site secondary road (State Highway 111A) Distance to primary road - 2.75 miles (State Highway 101) 2) Railroad; Site serviced by rail - No Distance to active rail line 1.56 miles TOWN: EXETER A. Site e-4 B. Size Approximately 115 acres C. Current Status 1) Existing Land Use: Abandoned Land - 80% 2) Zoning Status: Residential-Agricultural -100% Woodland - 20% D. Land and Water Resources Land Capability: Excellent - 0 Fair - 30% 2) Adjacent to surface tidal water - No Good - 50% Poor - 20% Distance - 1.75 miles 3) Tidal Water Capability - 4 (Squamscott River) 4) Adjacent to surface fresh water Yes Distance on site 5) Adjacent to Aquifer No Distance - 2 miles E. Utilities and Services 1) Distance to nearest major water hookup .13 miles What town(s) does this hookup serve - Exeter 2) Distance to nearest sewer hookup - .38 miles What town(s).does this hookup serve - Exeter 3) Utilities Available; Distance to nearest major transmission line 1.13 miles Type of transmission line - 115 KV line 4) Gas Pipeline; Distance to nearest gat main - .69 miles Type of gas main - Granite State Gas transmission line Distance to Granite State Gas transmission line .69 mi,les F. Transportation 1) Highway; Type of road which services or is nearest to site town road Distance to primary road - .25 miles (State Highway 1.01) 2) Railroad; Site serviced by rail -.No Distance to active rail line - 1.19 miles TOWN: EXETER A. 'Site e-5 B. Size - Approximately 350 acres C. Current Status 1) Existing Land Use: Woodland - 95% 2) Zoning Status: Residential-Agricultural - 50% Wetlands - 5% Commercial - 50% D. Land and Water Resources 1) Land Capability: Excellent - 35% Fair 30% 2) Adjacent to surface tidal water No Good - 20% Poor 15% Distance - .25 miles 3) Tidal Water Capability - 4 (Squamscott River) 4) Adjacent to surface fresh water Yes Distance on s.ite (Norris Brook) 5). Adjacent to Aquifer - No Distance - 2.25 miles E. Utilities and Services 1) Distance to nearest major water hookup on site What town(s) does this hookup serve - Exeter 2) Distance to nearest sewer hookup - .08 miles What town(s) does this hookup serve - Exeter 3) Utilities Available; Distance to nearest major transmission line .81 miles Type of transmission line - 115 KV line 4) Gas Pipeline; Distance to nearest gas main - adjacent to site Type of gas main - Granite State Gas line Distance to Granite State Gas transmission line adjacent to site F. Transportation 1). Highway; Type of road which services or is nearest to site primary road (State Highway 1011) Distance to primary road - Adjacent to site 2) Railroad; Site serviced by rail - Yes Distance to active rail line .06 miles TOWN: EXETER A. Site - e-6 B. Size Approximately 160 acres C. Current Status 1) Existing Land Use: Woodland 100% 2) Zoning Status: High Density Residential- 100% D. Land and Water Resources 1) Land Ca-pability: Excellent - 30% Fair - 0 2) Adjacent to surface tidal water - No Good - 40% Poor - 30% Distance - 1.25 miles .3) Tidal Water Capability - 4 (Squamscott River) 4) Adjacent to surface fresh water - Yes Distance on site (Exeter River) 5) Adjacent to Aquifer - No Distance - 1.75 miles E. Utilities and Services 1) Distance to nearest major water hookup - on site What town(s) does this hookup serve - Exeter 2) Distance to nearest sewer hookup - adjacent to site What town(s) does this hookup serve - Exeter 3) Utilities Available; Distance to nearest major transmission line .5 miles Type of transmission line - 34.5 KV line 4) Gas pipeline; Distance to nearest gas main - .75 miles Type of gas main - 4 inch high pressure gas main Distance to Granite State Gas transmission line - 1.44 miles F. Transportation 1) Highway; Type of road which services or is nearest to site secondary road (State Highway 108) Distance to primary road - 2.5 miles (State Highway 101) 2) Railr9ad; Site-serviced by rail - No Distance to active rail line .81 miles M@ t..4 r N J w. Ct. 30 AND %,Tl* IGreenl 01, Breakf-. Hill Cal -7771-1.11 TPIW TOWN: GREENLAND A. Site g-l B. Size Approximately 765 acres C. Current Status 1) Existing Land Use: Woodland - 55% 2) Zoning Status: Medium Density Residential 100% Agricultural - 30% Abandoned Land - 10% Residential - 5% D. Land and Water_Resources 1) Land Capability: Excellent - 45% Fair - 25% 2) Adjacent to surface tidal water - Yes Good - 25% Poor - 5% 3) Tidal Water Capability - 3 (Great Bay) 4) Adjacent to surface fresh water - Yes Distance - on site (Brackett Brook) 5) Adjacent to Aquifer No Distance - .94 miles E. Utilities and Services 1) Distance to nearest major water hookup .7 miles What town(s) does this hookup serve - Greenland, New Castle, Newington, Portsmouth and parts of Rye 2) Distance to nearest sewer hookup - 3.25 miles What town(s) does this hookup serve - Portsmouth 3) Utilities Available; Distance to nearest major transmission line I mile Type of transmission line - 34.5 KV line 4) Gas Pipeline; Distance to nearest gas main - 1.5 miles Type of gas main - Granite State Gas line Distance to Granite State Gas transmission line - 1.5 miles F. Transportation 1) Hig hway; Type of road which services or is nearest to site - town roads Distance to primary road - adjacent to site (.State Highway 101) 2) Railroad; Site serviced by rail Yes Distance to active rail line adjacent to site TOWN: GREENLAND A Site g-2 B. Size Approximately 185 acres C. Current Status 1) Existing Land Use: Agricultural - 70% 2) Zoning Status: Medium Density Residential 100% Woodland - 20% Abandoned Land - 5% Residential - 5% D. Land and Water Resources 1) Land Capability: Excellent 60% Fair - 5% 2) Adjacent to surface tidal water Yes Good - 0 Poor - 35% 3) Tidal Water Capability - 3 (Great Bay) 4) Adjacent to surface fresh water Yes Distance on site 5) Adjacent to aquifer, - No Distance - .44 miles E. Utilities and Services 1) Distance to nearest major water hookup on site What town(s) does thishookup serve - Greenland, New Castle, Newington, Portsmouth, and parts of Rye 2) Distance to nearest sewer hookup - .8 miles What town(s) does this hookup serve - Portsmouth 3) Utilities Available; Distance to nearest major transmission line .63 miles Type of transmission line - 34.5 KV line (near Ocean Rd. substation 34.5 KV line,.115 KV line) 4) Gas Pipeline; Distance to nearest gas main .13 miles Type of gas main - Granite State Gas line Distance to Granite State Gas transmission line - .13 miles F. Transportation 1) Highway; Type of road which services or is nearest to site town roads Distance to primary road - .38 miles (State Highway 101) 2) Railroad; Site serviced by rail - No Distance to active rail line - .38 miles TOWN:. GREENLAND A. Site - g-3 B. Size - Approximately 235 acres C. Current Status 1) Existing Land Use: Woodland - 60% 2) Zoning Status: @edium Density Residential 100% Extractive - 20% Agricultural - 20% D. Land and Water Resources 1) Land Capability: Excellent 20% Fair - 30% 2) Adjacent to surface tidal waters No Good - 35% Poor - 15% Distance - 1.5 miles 3) Tidal Water Capability - 3 (Great Bay) 4) Adjacent to surface fresh water Yet Distance on site (Thompson Brook) 5) Adjacent to aquifer Yes Distance - .25 miles E. Utilities and Services 1) Distance to nearest major water hookup .15 miles What town(s) does this hookup serve - Greenland, New Castle, Newington, Portsmouth, and parts of Rye 2) Distance to nearest sewer hookup - 2.6 miles What town(s) does this hookup serve - Portsmouth 3) Utilities Available; Distance to nearest major transmission line adjacent to site Type of transmission line - 34.5 KV line 4) Gas Pipeline; Distance to nearest gas main - .5 miles Type of gas main - Granite State Gas line Distance to Granite State Gas transmission line - .5 miles F. Transportation 1) Highway; Type of road which services or is nearest to site town roads Distance to primary road - .06 miles (State Highway 101) 2) Railroad; Site serviced by rail - No Distance to active rail line .75 miles TOWN: GREENLAND A. Site g-4 B. Size Approximately 100 acres C. Current Status 1) Existing Land Use - Abandoned Land - 10% 2) Zoning Status: Medium Density Residential 100% Woodland - 90% D. Land and Water Resources .1) Land Capability: Excellent - 60% Fair - 0 2) Adjacent to surface tidal water No Good 0. Poor - 40% Distance - 2.5 miles @3) Tidal Water Capability -'-:3 (Great Bay) 4) Adjacent to surface fresh water Yes Distance on site 5) Adjacent to Aquifer Yes Distance - .19 miles E. Utilities and Services:,_ 1) Distance to nearest major water hookup .7 miles What town(s) does this hookup serve - Hampton, North Hampton, and parts of Rye 2) Distance to nearest sewer hookup - 2.65 miles What town(s) does this hookup serve - Portsmouth 3) Utilities Available Distance to nearest major transmission line on site Type of transmission line - 115 KV line 4) Gas Pipeline; Distance to nearest gas main - adjacent to site Type of gas main - Granite State Gas line Distance to Granite State Gas Transmission line.- adjacent to site F. Transportation 1) Highway; Type of road which services or is nearest to site town road Distance to primary road - 1.38 mile's (State Highway 101) 2) Railroad; Site serviced by rail - No Distance to active rail line - 1.81 miles TOWN: GREENLAND A. Site g-5 B. Size Approximately 95 acres C. Current Status 1) Existing Land Use: Agricultural - 50% 2) Zoning Status: Medium Density Residential 100% Woodland - 50% D. Land and Water Resources 1) Land Capability: Excellent 55% Fair - 25% 2) Adjacent to surface tidal water No Good - 15% Poor - 5% Distance - 2.25 miles 3) Tidal Water Capability - 3 (Great Bay) 4) Adjacent to surface fresh water Yes Distance Adjacent to site 5) Adjacent to Aquifer - Yes. Distance - Site borders an aquifer E. Utilities and Services 1) Distance to nearest major-water hookup .13 miles What town(s) does this hookup serve Greenland, New Castle, Newington, Portsmouth, and parts of Rye 2) Distance to nearest sewer hookup - 1.5 miles What town(s) does this hookup serve - Portsmouth 3) Utilities Available; Distance to nearest major transmission line on site Type of Transmission line - 115 KV line 4) Gas Pipeline; Distance to nearest gas main - adjacent to site Type of gas main - Granite State Gas line Distance to Granite State Gas transmission line -.adjacent to site F. Transportation 1) Highway; Type of road which services or is nearest to site town road .Distance to primary road - .43 miles (Interstate 95) 2) Railroad; Site serviced by rail - No Distance to active rail line 1.25 miles TOWN: GREENLAND A. Site g-6 B. Size Approximately 235 acres C. Current Status 1) Existing Land Use: Wetlands - 10% 2) Zoning Status: Medium Density Residential Ift Agricultural - 5% Woodland - 85% D. Land and Water Resources 1) Land Capability: Excellent 0 Fair - 25% 2) Adjacent to tidal water No Good - 60% Poor - 15% Distance - 2 miles 3) Tidal Water Capability - 3 (Great Bay) 4) Adjacent to surface fresh water Yes Distance on site 5) Adjacent to aquifer - Yes Distance -'@! adjacent to site E. Utilities and Services 1) Distance to nearest major water hookup .25 miles What town(s) does this hookup serve - Greenland, New Castle, Newington, Portsmouth, and parts of Rye 2) Distance to nearest sewer hookup - .33 miles What town(s) does this hookup serve - Portsmouth 3). Utilities Available; Distance to nearest major transmission line adjacent to site Type of transmission line - 34.5 KV line 4) Gas Pipeline; Distance to nearest gas main - .38 miles Type of gas main - Granite State Gas line Distance to Granite State Gas transmission line .38 miles F. Transportation 1) Highway; Type of road which services or is nearest to site town road Distance to primary road - .63 miles (Interstate 95) 2) Railroad; Site serviced by rail @ Yes Distance to active rail line Adjacent to site *Town 7 d p i e @y Pon "al 'QOPULATION 0- P., cove 101C 0', "ce s Z@@)3n- Y10 M V5 FAS North Beach L-J? HAMP 7 k POP. ,qHAMPTON BEACH TATE RESERVAT)ON AUDOS 51 CA114 Creek /Great BOWS Head . . . . . . . . . . 0" 40 ft. 8, "Ch IAIMPT Vert. EL. 19 TE N cz PARK Hwptm Seabrook Narbor, 0 TOWN: HAMPTON A. Site h-l B. Size - Approximately 560 acres C. Current Status 1) Existing Land Use: Woodland - 65% 2) Zoning Status: Low Density Residential 100% Agri cultural - 15% Abandoned Land - 10% Residential - 5% Wetlands - 5% D. Land and'Water Resources 1) Land Capability: Excellent 40%. Fair - 15% 2) Adjacent to surface tidal water No Good - 15% Poor - 30% Distance - 4 miles 3) Tidal Water Capability - 3 (Hampton Harbor) .4) Adjacent to surface fresh water Yes Distance on site 5) Adjacent to Aquifer Yes Distance - site borders an aquifer E. Utilities and Services 1) Distance to nearest major water hookup .4 miles What town(s) does this hookup serve - Hampton, North Hampton, and parts of Rye, Exeter 2) Distance to nearest sewer hookup - adjacent to site What town(s) does this hookup serve - Exeter 3) Utilities Available - Distance to nearest major transmission line on site Type of transmission line - 34.5 KV line 4) Oil Pipeline; Distance to nearest gas main adjacent to,site Type of gas main - 4 inch high pressure gas main Distance to Granite State@:gas transmission line 2.25 miles F. Transportation 1) Highway; Type of road which services or is nearest to site primary road (Exeter- Hampton Expressway State Highway 51) 2) Railroad; Site serviced by rail - No Distance to active rail line 1.25 miles TOWN: HAMPTON A. Site h-2 B. Size Approximately 115 acres C. Current Status 1) Existing Land Use: Agricultural - 25% 2) Zoning Status: Medium Density Residential 100% Abandoned Land - 40% Woodland - 35% D. Land and Water Resources 1) Land Capability: *Excellent.- 80% Fair - 0 2) Adjacent to surface tidal waters No Good - 0 Poor - 20% Distance - 1.75 miles 3) Tidal Water Capability - 3 (Atlantic Ocean) 4) Adjacent to surface fresh water Yes Distance - on site 5) Adjacent to Aquifer - Yes Distance - Site borders aquifer E. Utilities and Services 1) Distance to nearest major water hookup - .05 miles What town(s) does this hookup serve - Hampton, North Hampton and parts of Rye 2) Distance -to nearest sewer hookup - .18'.miles What town(s) does this hookup serve - Hampton 3) Utilities Available; Distance to nearest major transmission line 1.69 miles Type of transmission line - 34.5 KV line 4) Gas Pipeline; Distance to nearest gas main - .5 miles Type of gas main - 2 inch high pressure gas main Distance to Granite State Gas Transmission line - 4.56 miles F. Transportation 1) Highway; Type of road which services@or is nearest to site town roads Distance to primary road - 1.13 miles (US Highway 1) Railroad; Site serviced by rail - No.- Distance to active rail line .44 miles TOWN: HAMPTON A. Site h-3 B. Size - Approximately 710 acres C. Current Status 1) Existing Land Use: Woodland - 40% 2) Zoning Status: General - 80% Residential - 20% Industrial - 20% Abandoned Land - 20% Agricultural - 20% D. Land and Water Resources 1) Land Capability: Excellent 55% Fair - 10% 2) Adjacent to surface tidal water No Good - 5% Poor - 30% Distance - 2.75 miles 3) Tidal Water Capability - 3 (Hampton Harbor) 4) Adjacent to SUrface fresh water Yes Distance on site 5) Adjacent to Aquifer Yes Distance - .06 E. Utilities and Services 1) Distance to nearest major water hookup .5 miles What town(s) does this hookup serve - Hampton, North Hampton, and parts of Rye 2) Distance to nearest sewer hookup - .48 miles What town(s) does this hookup serve - Hampton 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line 34.5 KV line 4) Gas Pipeline; Distance to nearest gas main - .25 miles Type of gas main - 4 inch high pressure gas main Distance to Granite State Gas Transmission line 3.75 miles F. Trans2ortation 1) Highway; Type of road which services*or is nearest to site primary road (Interstate 95) Distance to primary road - on site 2) Railroad; Site serviced by rail - No Distance to active rail line .56 miles TOWN: HAMPTON A. Site - h-4 B. Size - Approximately 105 acres C. Current Status 1) Existing Land Use: Woodland 55% 2) Zoning Status: High Density Residential 100% Abandoned Land 45% D. Land and Water Rescurces 1) Land Capability: Excellent - 60% Fair - 0 2) Adjacent to surface tidal waters No Good - 0 Poor - 40% Distance - .5 miles 3) Tidal Water Capability - 3 (Atlantic Ocean) 4) Adjacent to surface fresh water Yes Distance on site 5) Adjacent to Aquifer - Yes Distance - site borders an aquifer E. Utilities and Services 1) Distance to nearest major water hookup on site What town(s) does this hookup serve - Hampton, North Hamptono and parts of Rye 2) Distance to nearest sewer hookup - .15 miles What town(s) does this hookup serve - Hampton 3) Utilities Available; Distance to nearest transmission line I mile Type of transmission line - 34.5 KV line 4) Gas Pipeline; Distance to nearest gas main - .31 miles Type of gas main - 4 inch high pressure gas main Distance to Granite State Gas transmission line - 6 miles F. Transportation 1) Highway; type of road which services or is nearest to site secondary road (State highway 101E) Distance to primary road - 1.63 miles (US Highway 1) 2) Railroad; Site serviced by rail - No Distance to active rail line 1.38 miles *Town: Hampton Falls 9 Taylor -15 kol e0l @ 14 MV Cap 10 Op "0 to H@i y W N Oodge Ponds SEA TOWN: HAMPTON FALLS A. Site - hf-I B. Size - Approximately 185 acres C. Current Status 1) Existing Land Use: Woodland - 55% 2) Zoning Status: Residential-Agricultural 100% Agricultural - 45% D. Land and Water Resources 1) Land Capability: Excellent - 50% Fair - 0 2) Adjacent to surface tidal waters No Good - 0 Pool, - 50% Distance - 5.5 miles 3) Tidal Water Capability - 3 (Hampton Harbor) 4) Adjacent to surface fresh water No Di,stance .25 miles (Ash Brook) 5) Adjacent to Aquifer - No Distance - 1.38 miles E. Utilities and Services 1) Distance to nearest major water hookup Adjacent to site What town(s) does this hookup serve - Exeter 2) Distance to nearest sewer hookup - .1 miles What town(s) does this hookup serve - Exeter 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line - 34.5 KV line 4) Gas Pipeline; Distance to nearest gas main - .31 miles Jype of gas main - 4 inch high pressure gas main . Distance to Granite State Gas transmission line 2.5 miles F. Transportation 1) Highway; Type of road which services or is nearest to site secondary road (State Highway 88) Distance to primary road - 1.63 miles (State Highway 101) 2) Railroad; Site serviced by rail - No Distance to active rail line 2.69 miles TOWN: HAMPTON FALLS A. Site hf-2 B. Size Approximately 21 0 acres C. Current Status 1) Existing Land Use: Agricultural - 50% 2) Zoning Status: Residential-Agricultural 100% Residential - 5% Abandoned Land - 15% Woodland - 30% D. Land and Water Resources 1) Land Capability: Excellent 45% Fair - 50 2) Adjacent to surface tidal waters No '0 Good - 15% Poor - 35% Distance - 4.5 miles 3) Tidal Water Capability - 3 (Hampton Harbor) 4) Adjacent to surface fresh water Yes Distance on site 5) Adjacent to Aquifer - No Distance - 1.56 miles @E. Utilities and Services 1) Distance to nearest major water hookup 1.95 miles What town(s) does this hookup serve - Exeter 2) Distance to nearest sewer hookup - 1.6 miles What town(s) does this hookup serve - Exeter 3) Utilities Available; Distance to nearest major transmission line .19 miles Type of transmission line - 34.5 KV line 4) Gas Pipeline; Distance to nearest gas main - .94 miles Type of gas main - 4 inch high pressure gas main Distance to Granite State Gas transmission line - 3.69 miles F. Transportation- 1) Highway; Type of road which services or is nearest to site secondary road (State Hiqhway 88) Distance to primary road - 2.25 miles (Interstate 95) 2) Railroad; Site serviced by rail - No Distance to active rail line - 2.38 miles IOWN: HAMPTON FALLS A. Site hf-3 B. Size Approximately 350 acres C. Current Status 1) Existing Land Use: Agricultural - 40% 2) Zoning Status: Residential-Agricultural 100% Abandoned Land - 20% Wetlands - 15% Woodland - 20% Residential - 5% D. La:nd and Water Resources 1) Land Capability: Excellent -- 45% Fair - 10% 2) Adjacent to surface tidal water - No Good - 10% Poor - 35% Distance - 5 miles 3) Tidal Water Capability - 3 (Hampton Harbor) 4) Adjacent to surface fresh water - Yes Distance borders site (Taylor River) 5) Adjacent to Aquifer - No Distance - 2.5 miles E. Utilities and Services 1) Distance to nearest major water hookup 1.45 miles What town(s) does this hookup serve - Exeter 2) Distance to nearest sewer hookup - 1.1 miles What town(s) does this hookup serve - Exeter .3) Utilities Available; Distance to nearest major transmission line .19 miles Type of transmission line - 34.5 KV line 4) Gas Pipeline, Distance to nearest gas main - 1.63 miles Type of gas main - 4 inch high pressure gas main Distance to Granite State.Gas transmission line - 3.44 miles F. Transportation 1) Highway; Type of road which services or is nearest to site town roads Distance to primary road - 2.5 miles (Interstate 95) 2) Railroad; Site serviced by rail No Distance to active rail line - 3 miles TOWN: HAMPTON FALLS A. Site hf-4 B. Size Approximately 185 acres C. -Current Status 1) Existing Land Use: Agricultural - 75% 2) Zoning Status: Residential-Agricultural 100% Abandoned Land - 5% Woodland - 20% D. Land and Water Resources 1) Land Capability! Excellent - 35% Fair - 10% 2) Adjacent to surface tidal water No Good - 45% Poor - 10% Distance 3.5 miles 3) Tidal Water Capability - 3 (Hampton Harbor) 4) Adjacent to surface fresh water - No Distance - .15 miles (Taylor River) 5) Adjacent to Aquifer No Distance - 2 miles E. Utilities and Services 1) Distance to nearest major water hookup - 2.3 miles What town(s) does this hookup serve Hampton, North Hampton, and parts of Rye 2) Distance to nearest sewer hookup - 2.1 miles What town(s) does this hookup serve - Hampton Utilities Available; Distance to nearest major transmission line .19 miles Type of transmission line - 34.5 KV line 4) Gas Pipeline; Distance to nearest gas main - 1.63 miles Type of gas main - 4 inch high pressure gas main Distance -tl,,o Granite State Gas transmission line - 4.5 miles F. Transportation 1) Highway; Type of road which services or is nearest to site Secondary road (State Hig hway 88) Distance to primary road - 1.25 miles (Interstate 95) 2) Railroad; Site serviced by rail - No Distance to active rail line - .88 miles TOWN; HAMPTQN FALLS A. Site hf-5 B. Size Approximately 95 acres C. Current Status 1) Existing Land Use: Woodland - 85% 2) Zoning Status: Residential-Agricultural 100% Residential - 5% Agricultural - 10% D. Land and Water Resources 1) Land Capability: Excellent - 90% Fair - 5% 2) Adjacent to surface tidal water - No Good - 0 Poor - 5% Distance - 3 miles 3) Tidal Water Capability - 3 (Hampton Harbor) 4) Adjacent to surface fresh water - Yes Distance on site (Grapevine River) 5) Adjacent to Aquifer No Distance - 1.25 miles E. Utilities and Services 1) Distance to nearest major water hookup 1.45 What town(s) does this hookup serve - Hampton, North Hampton, and parts of Rye 2) Distance to nearest sewer hookup - 1.4 miles What town(s) does this hookup serve - Hampton 3) Utilities Available; Distance to nearest major transmission line .13 miles Type of transmission line - 34.5 KV line 4) Gas Pipeline; Distance to nearest gas main - 1.63 miles Type of gas main - 4 inch high pressure gas main Distance to Granite State Gas transmission line - 5 miles F. Transportation 1) Highway; Type of road which services or is nearest to site primary road (Interstate 95) Distance to primary road adjacent to site 2) Railroad; Site serviced by rail - No Distance to active rail line 1.13 miles TOWN: HAMPTQN FALLS A. Site hf-6 B. Size Approximately 265 acres C. Current Status 1) Existing Land Use: Agricultural - 60% 2) Zoning Status: Residential-Agricultural 100% Wetlands - 10% Woodland - 30% D. Land and Water Resources 1) Land Capability: Excellent 35% Fair - 10% 2) Adjacent to surface tidal waters No Good 35% Poor - 20% Distance - 3.5 miles 3) Tidal Water Capability 3 (Hampton Harbor) 4) Adjacent to surface fresh water Yes Distance on site 5) Adjacent to Aquifer - No Distance - 1.63 miles E. Utilities and Services 1) Distance to nearest major water hookup - 1.5 miles What town(s) does this hookup serve - Seabrook 2) Distance to nearest sewer hookup - 2.25 miles What town(s) does this hookup serve - Exeter 3) Utilities Available - Distance to nearest major transmission line adjacent to site Type of transmission line - 34.5 KV line 4) Gas Pipeline; Distance to nearest gas main - 1.13 miles Type of gas main - 4 inch high pressure gas main Distance to Granite State Gas transmission line - 4.56 miles F. Transportation 1) Highway; Type of road which services or is nearest to site town roads Distance to primary road - 1.38 miles (Interstate 95) 2) Railroad; Site serviced by rail @ No Distance to active rail line 1.81 miles TOWN: HAMPTON FALLS A. Site - hf-7 B. Size - Approximately 170 acres C. Current Status 1) Existing Land Use: Agricultural - 45% 2) Zoning Status: Residential-Wicultural 100% Residential - 15% Woodland - 40% D. Land and Water Resources 1) Land Capability: Excellent 70% Fair - 0 2) Adjacent to surface tidal water No Good - 20% Poor - 10% Distance - 3 miles 3) Tidal Water Capability - 3 (Hampton Harbor) 4) Adjacent to surface fresh water Yes Distance on site 5) Adjacent to aquifer - No Distance - 1.5 miles E. Utilities and Services 1) Distance to nearest major water hookup - 1.1 miles What town(s) does this hookup serve - Seabrook 2) Distance to nearest sewer hookup - 1.9 miles What town(s) does this hookup serve - Hampton 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line - 34.5 KV line 4) Gas Pipeline; Distance to nearest gas main - 2 miles Type of gas main - 4 inch high pressure gas main Distance to Granite State Gas transmission line - 5.25 miles F. Transportation 1) Highway; Type of road which services or is nearest to site - primary road (Interstate.95) Distance to primary road - adjacent to site 2) Railroad Site serviced by rail - No Distance to active rail line 1.13 miles TOWN: HAMPTON FALLS A. Site hf-8 B. Size Approximately 155 acres C. Current Status 1) Existing Land Use: Woodland 100% 2) Zoning Status: Residential-Agricultural 100% D. Land and Water Resources 1) Land Capability: Excellent 0 Fair - 0 2) Adjacent to surface tidal waters No Good - 60% Poor - 40% Distance - 3.25 miles 3) Tidal Water Capability - 3 (Hampton Harbor) 4) Adjacent to surface fresh water Yes Distance on site 5) Adjacent to Aquifer - No Distance - 1.31 miles E. Utilities and Services 1) Distance to nearest major water hookup .8 miles What town(s) does this hookup serve - Seabrook 2) Distance to nearest sewer hookup - 2.4 miles What town(s) does this hookup serve - Hampton 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line - 34.5 KV line 4) Gas Pipeline; Distance to nearest gas main - .75 miles Type of gas main - 4 inch high pressure gas main Distance to Granite State Gas transmission line - 5.25 miles F. Transportation 1) Highway; Type of road which services or is nearest to sit.e town roads Distance to primary road - .44 miles (Interstate 95) 2) Railroad; Site serviced by rail - No Distance to active rail line 1.25 miles --7--77777777 zf V,3 L *Town: Madbury "'0 N P0, BELLAMY PO @@Ct RESCR VOIR BELLAMY MadbufY 'V -- "En, @7, 6iA Cc) YJ5 TOWN: MADBURY A. Site - m-l B. Size - Approximately 190 acres C. Current Status 1) Existing Land Use: Woodland - 95% 2) Zoning Status: General Agricultural- Agricultural - 5% Residential 100% D. Land and Water Resources 1) Land Cap@bility: Excellent - 60% Fair - 30% 2) Adjacent to surface tidal water - No Good - 0 Poor - 10% Distance - 5.5 miles 3) Tidal Water Capabilities - 4. Bellamy River) 4) Adjacent to surface fresh water - Yes -3 tster River) Distance On site 5) Adjacent to aquifer No Distance - 1 mile E. Utilities and Services 1) Distance to nearest major water hookup 1.45 miles What town(s) does this hookup serve Dover 2) Distance to nearest sewer hookup - 1.5 miles What town(s) does the hookup serve - Dover 3) Utilities Available; Distance to nearest major transmission line 1.69 miles Type of transmission line - 345 -KV line 4) Gas pipeline - distance to nearest gas main 3.13 miles Type of gas main - 3 inch high pressure gas main Distance to Granite State gas transmission line - 5.25 miles F. Transportation 1) Highway; type or road which services or is nearest to site secondary road (State highway 9) Distance to primary road - 2.5 miles (Statehighway 155) 2) Railroad; site serviced by rail line - No Distance to active rail line 2.*69 miles TOWN: MADBURY A.. Site m-2 B. Size Approximately 275 acres C. Current Status 1) Existing Land Use: Woodland - 75% 2) Zoning Status: General Agricultural/ Abandoned Land - 10% Residential 100% Wetlands - 5% Agri cu I tural - 10% D. Land and Water Resources 1) Land Capability: Excellent 35% Fair - 5% 2) AdJacent to surface tidal waters No Good - 35% Poor - 25% Distance - 4 miles 3) Tidal Water Capability - 3 (Oyster River) 4) Adjacent to surface fresh water Yes Distance on site (Oyster River) 5) Adjacent to aquifer No Distance - 1 mile E. Utilities and Services 1) Distance to nearest major water hookup 1.78 miles What town(s) does thishookup serve - Durham 2) Distance to nearest sewer hookup - 1.4 miles What town(s) does this hookup serve - Durham 3) Utilities Available - Distance to nearest major transmission line I mile Type of transmission line 345 KV line 4) Gas pipeline; distance to nearest gas main - 3.19 miles Type of gas main - 3 inch high pressure gas main Distance to Granite State gas transmission line - 5.31 miles F. Transportation 1) Highway; type or road which services or is nearest to @ite Town road (Cherry Lane) Distance to primary road - .38 miles (State highway 155) 2) Railroad; site serviced by rail -w No Distance to active rail line 1.5 miles TOWN: MADBURY A. Site - m-3 B. Size - Approximately 440 acres C. Current Status 1) Existing Land Use: Woodland - 70% 2) Zoning Status: General Agricultural- Agricultural - 20% Residential 100% Abandoned Land - 10% D., Land and Water Resources 1) Land Capability: Excellent - 40% Fair. - 10% 2) Adjacent to surface tidal waters No Good - 15% Poor - 35% Distance - 2.5 miles 3) Tidal Water Capability - 3 (Oyster River) 4) Adjacent to surface fresh water Yes Distance on site 5) Adjacent to aquifer Yes Distance - .06 miles E. Utilities and Services 1) Distance to nearest major water hookup .15 miles What town(s) does this hookup serve - Durham 2) Distance to nearest sewer hookup - .18 miles What town(s) does th is hookup serve - Durham 3) Utilities Available; Distance to nearest major transmission line - on site Type of transmission line - Madbury substation - 34.5 KV line, 115 KV line, 345 KV line 4) Gas pipeline; distance to nearest gas main - 2 .44 miles Type of gas main - 3 inch high pressure gas main Distance to Granite State gas transmission line - 4.13 miles F. Transportation 1) Highway; type or road which services or is nearest to site primary road (State highway 155) Distance to primary road - on site 2) Railroad; site serviced by rail - Yes Distance to active rail line - adjacent to site TOWN: MADBURY A. Site m-4 B. Size Approximately 115 acres C. Current Status 1) Existing Land Use: Woodland - 30% 2) Zoning Status: General Agricultural- Agricultural - 70% Residential 100% D. Land and Water Resources 1) Land Capability: Excellent - 65% Fair - 25% 2) Adjacent to surface tidal waters No Good - 0 Poor - 10% Distance - 2 miles 3) Tidal Water Capability - 3 (Oyster River) 4) Adjacent to surface fresh water - No Distance .1 mile (Beards Creek) 5) Adjacent to aquifer - Yes Distance - .25 miles E. Utilities and Services 1) Distance to nearest major water hookup - .4 miles What town(s) does this hookup serve Durham 2) Distance to nearest sewer hookup - .43 miles What town(s) does this hookup serve - Durham 3) Utilities available; Distance to nearest major transmission line on site Type of transmission line - 345 KV line, 115 KV line, 34.5 KV line 4) Gas pipeline; Distance to nearest gas main - 1.88 miles Type of gas main - 3 inch high pressure gas main Distance to Granite State gas transmission line -.3.5 miles F. Transportation .1) Highway; Type or road which services or is nearest to site - town road (Evans Road) Distance to primary road - .19 miles (State highway 155) 2) Railroad; site serviced by rail - adjacent to site Distance to active rail line .06 miles TOWN:. MADBURY A. Site m-5 B. Size -Approximately 430 acres C. Current Status 1) Existing Land Use: Woodland - 75%. 2) 7oning Status: General Agricultural- Agricultu,ral - 25% Residential 100% D. Land and Water Resources 1) Land Capability: Excellent - 35% Fair - 25% 2) Adjacent to surface tidal waters - No Good - 15% Poor - 25% Distance - 1.25 miles 3) Tidal Water Capability - 3 (Oyster River) 4) Adjacent to surface fresh water - Yes Distance on site (Garrish Brook) 5) Adjacent to aquifer - Yes Distance - site borders an aquifer E. Utilities and Services 1) Distance to nearest major water hookup .5 miles What town(s) does this hookup serve - Durham 2) Distance to nearest sewer hookup - .45 miles What town(s) does this hookup serve - Dover 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line - 345 KV line, 115 KV line, 34.5 KV line 4) Gas pipeline; distance to nearest gas main - 1.5 miles Type of gas main - 3 inch high pressure gas main Distance to Granite State gas transmission line - 2.5 miles F. Transportation 1) Highway; type or road which services or is nearest to site town road (Perkins Road) Distance to primary road - .38 miles (US highway 4) 2) Railroad; site serviced by rail - No Distance to active rail line .56 miles TOWN: MADBURY A. Site - m-6 B. Size - Approximately 275 acres C. Current Status 1) Existing Land Use: Woodland - 65% 2) Zoning Status: General Agricultural- Agricultural - 35% Residential 100% D. Land and Water Resources 1) Land Capability: Excellent - 40% Fair - 25% 2) Adjacent to surface tidal waters No Good - 10% Poor - 25% Distance -.1 mile 3) Tidal Water Capability - 3 (Oyster River) 4) Adjacent to surface fresh water Yes Distance on site (Johnson Creek) 5) Adjacent to aquifer No Distance - .75 miles E. Utilities and Services 1) Distance to nearest major water hookup 1 mile What town(s) does this hookup serve - Durham 2) Distance to nearest sewer hookup - .58 miles What town(s) does this hookup serve - Dover 3) Utilities available; Distance to nearest major transmission line .25 miles Type of transmission line - 34.5 KV line 4) Gas Pipeline; distance to nearest gas main - 1.69 miles Type of gas main - 4 inch high pressure gas main Distance to Granite State Gas transmission line - 2 miles F. Transportation 1) Highway; Type or road which services or is nearest to site secondary road (state highway 108) Distance to primary road - .56 miles (US highway 4) 2) Railroad; site serviced by rail - No Distance to active rail line 1.56 miles RX0 Vert cl 6 V6. *Town: New Castle 13 rfxed Rh nor. c Witt. 10 Qp: lua Vert. Cl. Irfic IIAFJ,/@ 1970 POPULATION Basc 16 -2,9 4@' NO SUITABLE PARCELS OF LAND'WERE IDD IN NEWCASTLE *Town: Newifields d Bri Cl. 30 Rockingham 0 Ch max's I- dA' '0 RDA F@,,RDA F@JLRDA Ramp s S L 1970 - RAA Byl MAIN", (D @POP U LAT I Oflt,, x@ d li 843 ifor. m.. 50 *Lau OE,_v QQ 17 4 1, Newfields 0 Neoafktcdt@ To h 0 TOWN: NEWFIELDS A. Site ne-1 B. Size - Approximately 55 acres C. Current Status 1) Existing Land Use: Woodland 100% 2) Zoning Status: Residential-Agricultural 100% D. Land and Water Resources 1) Land Capability: Excellent 0 Fair 40% 2) Adjacent to surface tidal waters No Good 45% Poor 15% Distance - 3 miles 3) Tidal Water Capability 4 (Squamscott River) 4) Adjacent to surface fresh water - No 5) Adjacent to aquifer - No Distance .3 miles (Piscassic River) Distance - .75 miles E. Utilities and Services 1) Distance to nearest major water hookup 1.8 miles What town(s) does this hookup serve Newfields 2) Distance to nearest sewer hookup 2.6 miles What town(s) does this hookup serve - Newmarket 3) Utilities Available; Distance to nearest major transmission line 3.25 miles Type of transmission line - 34@5 KV line 4) Gas pipeline; Distance to nearest gas main - 3.75 miles Type of gas main - Granite State gas line Distance to Granite State Gas Transmission line - 3.75 miles F. Transportation 1) Highway; Type or road which services or is nearest to site secondary road (State highway 87) Distance to primary road - 2.25 miles 2) Railroad; site serviced by active rail line - Yes Distance to active rail line adjacent to site 6rmt BN npm*VZOL *Town: Newington 6erterOA h"CL PA ell 1, M-1 @c fsi foe .0 TOWN: NEWINGTON A. Site - n-l B. Size - Approximately 270 acres C. Current Status 1) Existing Land Use: Abandoned Land - 70% 2) Zoning Status: Waterfront - 25% Woodland - 20% Industrial - 75% Residential - 5% Commercial - 5% D. Land and Water Resources 1) Land Capability: Excellent - 45% Fair - 15% 2) Adjacent to surface tidal waters Yes Good - 5% Poor - 35% .3) Tidal Water Capability - 2 (Piscataqua River) 4) Adjacent to surface fresh water Yes Distance on site (Paul Brook) 5) Adjacent to aquifer - No Distance - .5 miles E. Utilities and Services 1) Distance to nearest major water hookup on site What town(s) does this hookup serve - Portsmouth, Greenland, New Castle, Newington and parts of Rye 2) Distance to nearest sewer hookup - .18 miles (sewer system being planned to serve site) What town(s) does this hookup serve - Portsmouth 3) Utilities Available; Distance to nearest major transmission line .19 miles Type of transmission line 115 KV line 4) pas pipeline; distance to nearest gas main - on site Type of gas main - 6 inch high pressure gas main Distance to Granite State gas transmission line - .31 miles F. Transportation 1) Highway; type or road which services or is nearest to site secondary road (Woodbury Avenue) Distance to primary road - .06 miles (Spaulding Turnpike) 2) Railroad; site serviced by rail - Yes Distance to active rail line - on site TOWN: NEWINGTON A. Site n-2 B. Size Approximately 190 acres C. Current Status 1) Existing Land Use: Agricultural - 90% 2) Zoning Status: Low Density Residential 100% Residential - 10% D. Land and Water Resources 1) Land Capability: Excellent - 55% Fair - 25% 2) Adjacent to surface tidal waters No Good - 0 Poor - 20% Distance - .13 miles 3) Tidal Water Capability - 3 (Great Bay) 4) Adjacent to surface fresh water Yes Distance on site 5) Adjacent to aquifer - Yes Distance - .25 miles E. Utilities and Services 1) Distance to nearest major water hookup .75 miles What town(s) does this hookup serve - Greenland, New Castle, Newington, Portsmouth, and parts of Rye 2) Distance to nearest sewer hookup - .9 miles What town(s) does this hookup serve - Portsmouth 3) Utilities Available; Distance to nearest major transmission line 1.63 miles Type of transmission line - 34.5 KV.,line 4) Gas pipeline; Distance to nearest gas main - .94 miles Type of gas main - Granite State line Distance to Granite State gas transmission line .94 miles F. Transportation 1) Highway; type or road which services or is nearest to site town roads Distance to primary road - .88 miles (State highway 101) 2) Railroad; Site serviced by rail - No Distance to active rail line 1.13 miles -,@7 7 *Town: Newmarket L r "rc%4 IM MAWn* kv, Town Bmt vj 0 ROM NEW RKET ob POP 2,645 '01 tU 0 r Cr A MI ID U la .361 RA 4 IQ P IT I O"N EJ I", 7 Id 11 -An- 40 N WFlr_ Fly* L Rap ro-f lir. a. 3o Vet4,.CL Va. TOWN: NEWMARKET A. Site nw-l B. Size - Approximately 725 acres C. Current Status 1) Existing Land Use: Woodland - 80% 2) Zoning Status: Zoned (No'defined use) Agricultural - 15% Wetlands - 5% D. Land and Water Resources 1) Land Capability: Excellent 25% Fair - 20% 2) Adjacent to surface tidal waters No Good - 30% Poor - 25% Distance - 4 miles 3) Tidal Water Capability - 3 (Lamprey River) 4) Adjacent to surface fresh water Yes Distance on site 5) Adjacent to Aquifer Yes Distance - .25 miles E. Utilities and Services 1) Distance to nearest major water hookup 1.3 miles What town(s) does this hookup serve - Newmarket 2) Distance to nearest sewer hookup - 2.05 miles What town(s) does this hookup serve - Newmarket 3) Utilities Available - Distance to nearest major transmission line .2 miles Type of transmission line - 34.5 KV line 4) Gas Pipeline; Distance to nearest gas main - 5.25 miles Type of Gas main - Granite State gas line Distance to Granite State Gas transmission line - 5.25 miles F. Transportation 1) Highway; Type of road which services or is nearest to site town road Distance to primary road - 2.5 miles (State Highway 125) 2) Railroad; Site serviced by rail - No Distance to active rail line - 1.38 miles TOWN: NEWMARKET A. Site - nw-2 @iu 3901 IV ISV03 B. Size - Approximately 140 acres Of C. Current Status 1) Existing Land Use: Woodland 80% 2) Zoning Status: Zoned (No defined use) Agricultural 15% Wetlands 5% D. Land and Water Resources 1) Land Capability: Excellent 20% Fair 10% 2) Adjacent to surface tidal water No Good - 30% Poor 40% Distance - 1.2 miles 3) Tidal Water Capability - 3 (Lamprey River) 4) Adjacent to surface fresh water No Distance .19 miles 5) Adjacent to Aquifer - Yes Distance - adjacent to aquifer E.. Utilities and Services 1) Distance to nearest major water hookup 1.5 miles What town(s) does this hookup serve - Newmarket 2) Distance to nearest sewer hookup - 1.73 miles What town(s) does this hookup serve - Newmarket 3) Utilities Available; Distance to nearest major transmission line .58 miles Type of transmission line - 34.5 KV line 4) Gas Pipeline; Distance to nearest gas main - 5,miles Type of Gas Main - Granite State Gas Line Distance to Granite State Gas transmission line - 5 miles F. Transportation 1) Highway; Type or road which services or is nearest to site town road Distance to primary road - 3.75 miles (State Highway 125) 2) Railroad; Site serviced by rail - No Distance to active rail line - 1.96 miles TOWN: NEWMARKET A. Site - nw-3 B. Size - Approximately 95 acres C. Current Status 1) Existing Land Use: Woodland 15% 2) Zoning Status: Zoned (No defined use) Abandoned Land 10% Wetlands 75% D. Land and Water Resources 1) Land Capability: Excellent - 40% Fair - 45% 2) Adjacent to surface t 1dal water No Good - 5% Poor - 10% Distance - I mile 3) Tidal.Water Capability - 3 (Lamprey River) 4) Adjacent to surface fresh water Yes Distance Adjacent to site 5) Adjacent to aquifer - Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup on site What town(s) does this hookup serve - Newmarket 2) Distance to nearest sewer hookup - adjacent to site What town(s) does this hookup serve - Newmarket 3) Utilities Available; Distance to nearest major transmission line .5 miles Type of transmission line - 34.5 KV line 4) Gas Pipeline; Distance to nearest gas main - 4.06 miles lype of gas main - Granite State Gas line Distance to Granite State Gas Transmission line - 4.06 miles F. Transportation 1) Highway; Type of road which service s or is nearest to site secondary road (State Highway 108) Distance to primary road - 5 miles 2) Railroad; Site serviced by rail - No Distance to active rail line - .19 miles TOWN: NEW14ARKET A. Site - nw-4 B. Size - Approximately 335 acres C. Current Status 1) Existing Land Use: Woodland - 45% 2) Zoning Status: Zoned (No defined use) Agricultural - 30% Abandoned Land - 5% Wetlands - 20% D. Land and Water Resources 1) Land Capability: Excellent - 25% Fair - 15% 2) Adjacent to surface tidal water - No Good - 30% Poor - 30% Distance - 2.5 miles. 3) Tidal Water Capability - 3 (Lamprey River) 4), Adjacent to surface fresh water - Yes Distance on site (Piscassic River) 5) Adjacent to aquifer - No Distance - .38 miles E. Utilities and Services 1) Distance to nearest major water hookup .65 miles What town(s) does this hookup serve - Newmarket 2) Distance to nearest sewer hookup - .83 miles What town(s) does this hookup serve - Newmarket 3) Utilities Available - Distance to nearest major transmission line 1.94 miles Type of transmission line - 34.5 KV line 4) Gas Pipeline; Distance to nearest gas main - 4.13 miles Type of gas main - Granite State Gas line Distance to Granite State Gas transmission line 4.13 miles F. Transportation 1) Highway; Type of road which services or is nearest to'site town roads Distance to primary road - 4.25 miles (State Highway 101) 2) Railroad; Site serviced by rail - No Distance to active rail line - 1 mile TOWN: NEWMARKET .A. Site nw-5 B. Size - Approximately 155 acres C. Current Status 1) Existing Land Use: Abandoned Land - 5% .2) Zoning Status: Zoned (No defined use) Agricultural - 10% Wetlands - 10% Woodland - 75% D. Land and Water Resources 1) Land Capability: Excellent 45% Fair - 20% 2) Adjacent to surface tidal water - No Good - 0 Poor - 35% Distance - .5 miles 3) Tidal Water Capability - 3 (Lamprey River) 4) Adjacent to surface fresh water - Yes Distance on site 5) Adjacent to Aquifer - No Dis@tance - .38 miles E. Utilities and Services 1) Distance to nearest major water hookup .25 miles What town(s) does this hookup serve - Newmarket 2) Distance to nearest sewer hookup - .18 miles What town(s) does this hookup serve - Newmarket 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line - 34.5 KV line 4) Gas Pipeline; Distance to nearest gas main - 3.5 miles Type of gas main - Granite State Gas line Distance to Granite State Gas transmission line - 3.5 miles F', Transportation 1) Highway; Type of raod which services or is nearest to-site town road Distance to primary road.- 3 miles (State Highway 101) 2) Railroad; Site serviced by rail Yes Distance to active rail line - adjacent to sit @4 *Town: North Hampton N 0. R i:,H I A - M P North 9701z POPULATION 3,259 N-f'O" 'O'D 0- North Afill P T I jkliorn ton f, Pond tiornplon Center /HAMPTON .1 AIRPO 51 Go" 0170, 6, A 0 TOWN: NORTH HAMPTON A. Site - nh-1 B. Size - Approximately 320 acres C. Current Status 1) Existing Land Use: Agricultural - 20% 2) Zoning Status: Residential-Agricultural - 15% Abandoned Land - 15% Medium Density Residential - 30% Commercial - 5% Low Density Residential - 40% Woodland - 60% Business-Industrial - 15% D. Land and Water Resources 1) Land Capability: Excellent - 25% Fair - 15% 2) Adjacent to surface tidal waters No Good - 20% Poor - 40% Distance - 2.25 miles 3) Tidal Water Capability - 3 (Atlantic Ocean) 4) Adjacent to surface fresh water Yes Distance - on site (North Brook) 5) Adjacent to Aquifer - Yes Distance - site borders an aquifer E. Utilities and Services .1) Distance to nearest major water hookup .25 miles What town(s) does this.hookup serve - North Hampton, Hampton and parts of Rye 2) Distance to nearest sewer hookup - 1.48 miles What town(s) does this hookup serve - Portsmouth 3) Utilities Available; Distance to nearest major transmission line .13 miles Type of transmission line - 34.5 KV line 4) Gas pipeline; Distance to nearest gas main - 1.25 miles Type of gas main - 2 inch high pressure gas main Distance to Granite State gas transmission line - 2.38 miles F. Transportation 1) Highway; Type or road which services or is nearest to site primary road (US highway 1) Distance to primary road - Adjacent to site 2) Railroad; Site serviced by rail - Yes Distance-to active rail line - Adjacent to site TOWN:, NORTH HAMPTON A. Site"- nh-2 B. Size - Approximately 90 acres C. Current Status 1) Existing Land Use: Abandoned Land - 25% 2) Zoning Status: Medium Density Residential 100% Residential - 25% Agri cultural - 5% Woodland - 45% D. Land and Water Resources 1) Land Capability: Excellent - 40% 'Fair - 200 2) Adjacent to surface tidal waters No Good - 0 Poor - 40% Distance - 2 miles 3) Tidal Water Capability - 3 (Atlantic Ocean) 4) Adjacent to surface fresh water Yes Distance - on site 5) Adjacent to Aquifer - Yes Distance - Adjacent to site E. Utilities and Services 1) Distance to nearest major water hookup on site What town(s) does this hookup serve - Hampton, North Hampton, and parts of Rye 2) Distance to nearest sewer hookup - .5 miles What town(s) does this hookup serve - Hampton 3) Utilities Available; Distance to nearest major transmission line - 1.5 miles Type of transmission line - 34.5 KV line 4) Gas pipeline; Distance to nearest gas main - .5 miles Type of gas main - 2 inch high pressure gas main Distance to Granite State gas transmission line - 4 miles F. Transportation 1) Highway; Type of road which services or is nearest to site town roads Distance to primary road - .38 miles 2) Railroad; site serviced by rail - No Distance to active rail line - .19 miles TOWN: NORTH HAMPTON A. Site - nh-3 B. Size - Approximately 280 acres C. Current Status 1) Existing Land Use: Residential - 5% 2) Zoning Status: Low Density Residential 100% Agricultural - 5% Abandoned Land - 5% Woodland - 85% D. Land and Water Resources 1) Land Capability: Excellent - 60% Fair - 40% 2) Adjacent to surface tidal water No Good - 0 Poor - 0 Distance - .25 miles 3) Tidal Water Capability - 3 (Atlantic Ocean) 4) Adjacent to surface fresh water Yes Distance on site 5) Adjacent to Aquifer - No Distance - .75 miles E. Utilities and Services 1) Distance to nearest major water hookup - on site What town(s) does this hookup serve - Hampton, North Hampton, and parts.of Rye 2) Distance to nearest sewer hookup - 1.45 miles What town(s) does this hookup serve - Hampton 3) Utilities Available; Distance to nearest major transmission line 3.13 miles Type of transmission line - 34.5 KV line 4) Gas pipeline; Distance to nearest gas main .88 miles Type of gas main - 3 inch high pressure gas main Distance to Granite State gas transmission line - 4.25 miles F. Transportation 1) Highway; Type of road which services or is nearest to site town roads Distance to primary road - 2.5 miles (US highway 1) 2) Railroad; Site serviced by rail - No Distance to active rail line - 1.94 miles 77 14' h Sai i I (C-. r Rx e 4, 4 fv!6w, Vert - C4. *Town: I ZO 'J* IKPU t;O Itr. cl veri. RAD povk-Tsmo Varf 14 POP COS, 4 A ore Wr CL CL 0 '1 @60 Irv <Z B 'd Ror. CL :F fL 4D V 5 TOWN: PORTSMOUTH A. Site P-1 B. Size - Approximately 365 acres C. Current Status 1) Existing Land Use: Abandoned Land - 35% 2) Zoning Status: Industrial 25% Woodland - 50% High Density Residential 25% Residential - 10% Light Indust. 20% Medium Density Res. 20% Urban - 5% Commercial - 5% Apartment 5% D. Land and Water Resources 1) Land Capability: Excellent 70% Fair - 5% 2) Adjacent to surface tidal water - No Good - 0 Poor - 25% Distance - [email protected] 3) T-idal Water Capability - 2 (Piscataqua River) 4) Adjacent to surface fresh water - Yes Distance on site 5) Adjacent to aquifer - No Distance - .81 miles E. Utilities and Services 1) Distance to nearest major water hookup - adjacent to site What town(s) does this hookup serve - Portsmouth, Greenland, New Castle, Newington, and parts of Rye 2) Distance to nearest sewer hookup -.on site What town(s) does this hookup serve - Portsmouth 3) Utilities Available; Distance to nearest major transmission line adjacent to site Type of Transmission line - 115 KV line 4) Gas pipeline; Distance to nearest gas main - on site Type of gas main - 2 inch high pressure gas main Distance to Granite State Gas transmission line .13 miles F. Transportation 1) Highway; Type or road which services or is nearest to site primary road (Spaulding Turnpike) Distance to primary road - adjacent to site 2) Railroad; site serviced by rail - No Distance to active rail line .19 miles TOWN: PORTSMOUTH A. Site p-2 B. Size Approximately 110 acres C. Current Status 1) Existing Land Use: Abandoned Land - 45% 2) Zoning Status: Light Industrial 100% Wetlands - 35% Woodland - 20% D. Land and Water Resources 1) Land Ca@ability: Excellent 10% Fair - 30% 2) Adjacent to surface tidal waters No Good 55% Poor - 5% Distance - 1.75 miles 3) Tidal Water Capability 2 (Piscataqua River) 4) Adjacent to surface fresh water - No Distance .3 miles (Harvey Lake) 5) Adjacent to aquifer - Yes Distance - site borders an aquifer E. Utilities and Services 1) Distance to nearest major water hookup - adjacent to site What town(s) does this hookup serve - Portsmouth, Greenland, New Castle, Newington and parts of Rye 2) Distance to nearest sewer hookup - on site What town(s) does this hookup serve - Portsmouth 3) Utilities Available - Distance to nearest major transmission line on site Type of transmission line - 34.5 KV line, 115 KV line 4) Gas pipeline; distance to nearest gas main - on site Type of gas main - 4 inch high pressure Distance to Granite State gas transmission line - .13 miles F. Transportation 1) Highway; type or road which services or is,nearest to site primary road (Interstate 95) Distance to primary road adjacent to site 2) Railroad; site serviced by rail Yes Distance to active rail line - on site V)Q lor) DD 7s zz ILRO" 10 V :1 IV70 ca Pop *Town: Rollinsford 4 Woof HOP& sba@ Vert ci. 'K TOWN: ROLLINSFORD A. Site - r-l .B. Size - Approximately 125 acres C. Current Status 1) Existing Land Use: Agricultural - 65% 2) Zoning Status: High,Density Residential - 35% Abandoned Land - 30% Industrial - 65% Woodland - 5% D. Land and Water Resources 1) Land Capability: Excellent - 55% Fair - 0 2) Adjacent to surface tidal waters - No Good - 5% Poor - 40% Distance - 1 mile 3) Tidal Water Capability - 4 (Salmon Falls River) 4) Adjacent to surface fresh water Yes Distance borders surface fresh water 5) Adjacent to aquifer - Yes Distance - .19 miles E. Utilities and Services 1) Distance to nearest major water hookup on site What town(s) does this hookup serve - Rollinsford. 2) Distance to nearest sewer hookup - on site What town(s) does this hookup serve - Rollinsford 3) Utilities available; distance to nearest major transmission line 1.69 miles Type of transmission line - 34.5 KV line 4) Gas pipeline; distance to nearest gas main - 1.81 miles Type of gas main - Granite State Line Distance to Granite State Gas transmission line - 1.81 miles F. Transportation 1) Highway; type of road which services or is nearest to site-- town road Distance to primary road - 2.13 miles (State highway 16A) 2) Railroad; site serviced by rail - Yes Distance to active rail line - on site TOWN: ROLLINSFORD A. Site r-2 B. Size approximately 235 acres C. Current Status 1) Existing Land Use: Agricultural - 25% 2) Zoning Status: Low Density Residential 100% Abandoned Land - 25% Woodland - 50% D. Land and Water Resources 1) Land Capability: Excellent 60% Fair - 20% 2) Adjacent to surface tidal waters No Good - 0 Poor - 20% Distance - .5 miles 3) Tidal Water Capabilities - 4 (Salmon Falls River) 4) Adjacent to surface fresh water Yes Distance on site (Sligo Creek) 5) Adjacent to aquifer - No Distance - .69 miles E@ Utilities and Services 1) Distance to nearest major water hookup - on site What town(s) does this hookup serve - Rollinsford 2) Distance to nearest sewer hookup - .33 miles (adjacent to proposed extension) What town(s) does this hookup serve - Rollinsford 3) Utilities Available - Distance to nearest major transmission line 1.5 miles Type of transmission line - 34.5 KV 4) Gas pipeline; distance to nearest gas main 1.44 miles Type of gas main - Granite State line Distance to Granite State gas transmission line - 1.44 miles F. Transportation 1) Highway; type of raod which services or is nearest to site secondary road (Portland Avenue) Distance to primary road - 2.13 miles (State highway 9 (16) 2) Railroad; site serviced by rail - No Distance to active rail line - .25 miles TOWN: ROLLINSFORD A. site - r-3 B. Size - approximately 375 acres C. Current Status 1) Existing Land Use: Agriculture - 40% 2) Zoning Status: Low Density Residential 100% Abandoned Land - 40% Woodland - 20% D. Land and Water Resources 1) Land Capability: Excellent - 60% Fair 10% 2) Adjacent to surface tidal waters No Good - 20% Poor 10% Distance - .06 miles 3) Tidal Water Capability - 4 (Salmon Falls River) 4) Adjacent to surface fresh water Yes Distance on site 5) Adjacent to aquifer No Distance - 1.5 miles E. Utilities and Services 1) Distance to nearest major water hookup .6 miles What town(s) does this hookup serve - Dover 2) Distance to nearest sewer hookup - 1.25 miles What town(s) does the hookup serve - Rollinsford 3) Utilities Available; distance to nearest major transmission line 1.25 miles Type of transmission line - 34.5 KV 4) Gas pipeline; distance to nearest gas main - 1.19 miles Type of gas main - Granite State line Distance to Granite State gas transmission line - 1.19 miles F. Transportation 1) Highway; type of road which services or is nearest to site town roads (Sligo Road) Distance to primary road - 2.06 miles (State highway 9 (16) 2) Railroad; site serviced by rail - No Distance to active rail line 1.25 miles @3m,2 LLL -14 4 11. FG, V, S o GI eel hf@ A- ORNE POWt S'IATC PNAK C",* e i seov Foyes 056orner b '8411 O'D %I0 4/\ 5 24 @ I o'+ ;@ 47 14 ,48 23 3 6cO2&==mI3 I Longs 5 Fft@ Corner 0 6 IV OU13 a 6 Rye tt" Ip 45 wesl PA t@, XAI 13 C! S+m Ile m Eel pond OLA( lylill)p Rye. Lccj3(; 0 3LM ------ Li@ ..... TOWN: RYE A. Site ry-l B. Size approximately 215 acres C. Current Status 1) Existing Land Use: Residential - 30% 2) Zoning Status: Medium Density Residential 100% Woodland - 60% Agricultural - 5% Abandoned Land - 5% D. Land and Water Resources 1) Land Capability: Excellent 60% Fait, 35% 2) Adjacent to surface tidal waters No Good - 0 Poor 5% Distance approximately .5 miles 3) Tidal Water Capabilities - 3 (Atlantic Ocean) 4) Adjacent to surface fresh water - Yes Distance - Site borders surface fresh water 5) Adjacent to aquifer - No Distance - .38 miles E.. Utilities and Services 1) Distance to nearest major water hookup - on site What town(s) does this hookup serve - Hampton, North Hampton and parts of Rye 2) Distance to nearest sewer hookup - 2.18 miles What town(s) does this hookup serve - Portsmouth 3) Utilities Available - Distance to nearest major transmission line .56 miles Type of transmission line - 34.5 KV line 4) Gas pipeline; distance to nearest gas main - 1.88 miles Type of gas main - 3-inch high pressure gas main Distance to Granite State Gas transmission line - 3.13 miles F. Transportation 1) Highway; type of road which services or is nearest to site town roads Distance to primary road - 1.19 miles (U.S. Route 1) 2) Railroad; site serviced by rail - No Distance to active rail line 1.38 miles T.- *Town: Seabroo z Nor. C r fml LAO ve BrO HAMM oil. a 5 H 60V Islond ok Creek 1970 L7) POPULAT Thomcs Rock q Lola Ll SITIlt @uu Atlant.ic Seo.brook Seo( R.St ok R. R. S to. Seab ,tow FAS 286 2A E L 1-1 @111 I @ TOWN: SEABROOK A. Site - s-l B. Size - Approximately 145 acres C. Current Status 1) Existing Land Use: Woodland - 75% 2) Zoning Status: Medium Density Residential 60% Agricultural - 10% Business-Industrial - 40% Commercial - 10% Abandoned Land - 5% 0. Land and Water Resources 1) Land Capability: Excellent 0 Fair - 15% 2). Adjacent to surface tidal water - No Good - 35% Poor - 50% Distance 3.75 miles 3) Tidal Water Capability - 3 (Seabrook Harbor) 4) Adjacent to surface fresh water - Yes Distance On site 5) Adjacent to Aquifer - Yes Distance - site borders an aquifer E. Utilities and Services 1) Distance to nearest major water hookup - 1.5 miles What town(s) does this hookup serve Seabrook 2) Distance to nearest sewer hookup - 4.35 miles What town(s) does this hookup serve - Hampton 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line 34.5 KV line 4) Gas Pipeline; Distance to nearest gas main - .25 miles Type of gas main - 4 inch high pressure gas main Distance to Granite State Gas transmission line - 4.81 miles F. Transportation 1) Highway; type or road which services or is nearest to site secondary road (State highway 107) Distance to primary road 1.25 miles (Interstate 95) 2) Railroad; site serviced by rail - No Distance to active rail line 1.88 miles TOWN- SEABROOK A. Site - s-2 B. Size - Approximately 110 acres C. Current Status 1) Existing Land Use: Woodland - 70% 2) Zoning Status: Business - 15% Agricultural - 10% Medium Density Residential - 30% Abandoned Land - 10% Business-Industrial - 55% Residential - 10% D. Land-and Water Resources 1) Land Capability: Excellent - 40% Fair - 35% 2) Adjacent to surface tidal water - No Good - 0 Poor - 25% Distance - 3 miles 3) Tidal Water Capability - 3 (Seabrook Harbor) 4) Adjacent to surface fresh water - Yes Distance on site 5) Adjacent to Aquifer - No Distance - 1 mile E. Utilities and Services 1) Distance to nearest major water hookup - .3 miles What town(s) does this hookup serve - Seabrook 2) Distance to nearest sewer hookup - 3.3 miles What town(s) does this hookup serve - Hampton 3) Utilities Available; Distance to nearest major transmission line .31 miles Type of transmission line - 34.5 KV line 4) Gas pipeline; Distance to nearest gas main - on site Type of gas main - 4 inch high pressure gas main Distance to Granite State Gas transmission line - 5.63 miles F. Transportation 1) Highway; Type or road which services or is nearest to site secondary road (State highway 107) Distance to primary road - adjacent to site (Interstate 95) 2) Railroad; Site serviced by rail - no Distance to active rail line - 1.13 miles TOWN: SEABROOK A. Site s-3 B. Size Approximately 160 acres C. Current Status 1) Existing Land Use: Commercial - 5% 2) Zoning Status:. Business - 25% Residential - 15% Business-Industrial - 75% Woodland - 80% D. Land and Water Resources 1) Land Capability: Excellent 50% Fair - 0 2) Adjacent to surface tidal water - No Good - 0 Poor - 50% Distance 1.75 miles 3) Tidal Water Capability - 3 (Seabrook Harbor) 4) Adjacent to surface fresh water - Yes Distance on site 5) Adjacent to Aquifer - No Distance - I mile E. Utilities and Services 1) Distance to nearest major water hookup - .1 miles What town(s) does this hookup serve - Seabrook 2) Distance to nearest sewer hookup - 2.6 miles What town(s) does this hookup serve - Hampton 3) Utilities Available; Distance to nearest major transmission line 1.63 miles Type of transmission line - 34.5 KV line 4) Gas pipeline; Distance to nearest gas main - .38 miles Type of gas main - 4 inch high pressure gas main Distance to Granite State gas transmission line 6.81 miles F. Transportation 1) Highway; Type*or road which services or is nearest to site town road Distance to primary road - .13 miles (US Highway 1) 2) Railroad; site serviced by rail - Yes Distance to active rail line on site TOWN: SEABROOK A. Site - s-4 B. Size - Approximately 225 acres C. Current Status 1) Existing Land Use: Woodland 100% 2) Zoning Status: Business - 70% Business-Industrial - 30% D. Land and Water Resources 1) Land Capability: Excellent 15% Fair - 10% 2) Adjacent to surface tidal waters No Good - 55% Poor - 20% Distance - 2.5 miles 3) Tidal Water Capability - 3 (Seabrook Harbor) 4) Adjacent to surface fresh water Yes Distance site borders surface fresh water 5) Adjacent to Aquifer - Yes (Cains Creek) Distance - .13 miles E. Utilities and Services 1) Distance to nearest major water hookup - .08 miles What town(s) does this hookup serve - Seabrook 2) Distance to nearest sewer hookup - 3.6 miles What town(s) does this hookup serve - Hampton 3) Utilities Available; Distance to nearest major transmission line 1 mile Type of transmission line - 34.5 KV line 4) Gas pipeline; Distance to nearest gas main - adjacent to site Type of gas main - 4 inch high pressure gas main Distance to Granite State gas transmission line - 6.06 miles F. Transportation 1) Highway; Type or road which services or is nearest to site,- primary road (Interstate 95) Distance to primary road - on site 2) Railroad; Site serviced by rail - No Distance to active rail line .5 miles TOWN: SEABROOK A. Site s-5 B. Size Approximately 405 acres C. Current Status 1) Existing Land Use: Woodland - 65% 2) Zoning Status: Business 100% Residential - 30% Abandoned Land - 5% D. Land and Water Resources 1) Land Capability: Excellent - 45% Fair - 100 2) Adjacent to surface tidal waters No Good - 5% Poor - 40% Distance - 1.25 miles 3) Tidal Water Capability - 3 (Seabrook Harbor) 4) Adjacent to surface greshwater - Yes Distance on site (Cains Mill Pond) 5) Adjacent to Aquifer - Yes Distance - Site borders an aquifer E. Utilities and Services 1) Distance to nearest major water hookup - on site What town(s) does this hookup serve - Seabrook 2) Distance to nearest sewer hookup - 3 miles What town(s) does this hookup serve - Hampton 3) Utilities Available; Distance to nearest major transmission line 2.06 miles Type of transmission line - 34.5 KV line 4) Gas pipeline; Distance to nearest gas main - on site Type of gas main - 3 inch high pressure gas main Distance to Granite State Gas transmission line - 7.19 miles F. Transportation 1) Highway; Type or road which services or is nearest to site town roads Distance to primary road - Adjacent to (US highway 1),' 2) Railroad; Site serviced by rail - Yes Distance to active rail line on site For (L. VIM te i -CL. It S *Town: Strath ILI C/5 'A 6' 2 29 lul Joe eweii fh@ 4 v CA, ts I,Jj RxEd "4r. Vett . CL 14 Fk 13 EM <0 4D top 01 Al, 11, 19 Bf0ok Ram ni@ TOWN: STRATHAM A. Site st-I B. Size - Approximately 665 acres C. Current Status 1) Existing Land Use: Woodland - 60% 2) Zoning Status: Residential-Agricultural 100% Abandoned Land - 15% Agricultural - 20% Residential - 5% D. Land and Water Resources 1) Land Capability: Excellent - 75% Fair - 5% 2) Adjacent to surface tidal water - No Good - 10% Poor - 10% Distance - .19 miles 3) Tidal Water Capability - 3 (Great Bay) 4) Adjacent to surface fresh water Yes Distance on site 5) Adjacent to Aquifer No Distance- 1 mile E. Utilities and Services 1) Distance to nearest major water hookup 1.8 miles What town(s) does this hookup serve - Greenland, New Castle, Newington, Portsmouth, and parts of Rye 2) Distance to nearest sewer hookup - 3.48 miles What town(s) does this hookup serve - Exeter 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line 34.5 KV line 4) Gas Pipeline; Distance to nearest gas main r 2 miles Type of gas main - Granite State Gas line Distance to Granite State Gas transmission line - 2 miles F. 1) Highway; Type of road which services or is nearest to site town roads Distance tp primary road - .19 miles (State Highway 101) 2) Railroad; Site serviced by rail - Yes Distance to activ e rail 1 ine adjacent to sit TOWN: STRATHAM A. Site st-2 B. Size Approximately 155 acres C. Current Status 11) Existing Land Use Woodland - 65% 2) Zoning Status: Residential-Agricultural 100% Agri cul tural - 10% Abandoned Land - 25% D. Land and Water Resources 1) Land Capability: Excellent 45% Fair - 35% 2) Adjacent to surface tidal water No. Good - 0 Poor - 20% Distance - 1.25 miles 3) Tidal Water Capability - 4 (Squamscott River) 4) Adjacent to surface fresh water Yes- Distance - on site 5) Adjacent to Aquifer - No Distance .94 miles E. Utilities,and Services .1) Distance to nearest major water hookup - 2.8 miles M01 IvibV04 What town(s) does this hookup serve - Exeter 2) Distance to nearest sewer hookup - 2.8 miles What town(s) does this hookup serve - Exeter 3) Utilities Available; Distance to nearest major transmission line .44 miles Type of transmission line - 34.5 KV line 4) Gas Pipeline; Distance to nearest gas main - 1.13 miles Type of gas main - Granite State Gas line Distance to Granite State Gas transmission line - 1.13 miles F. Trans2ortation 1) Highway; Type of road which services or is nearest to site town roads Distance to primary road - .13 miles (State Highway 101) 2) Railroad; Site serviced by rail - No Distance to actice rail line - 1.5 miles TOWN' STRATHAM A. Site st-3 B. Size - Approximately 405 acres C. Current Status 1) Existing Land Use: Wetlands - 5% 2) Zoning Status: Residential-Agricultural 100% Woodland - 85% Agri cul tura I- 10% D. Land and Water Resources 1) Land Capability: Excellent - 50% Fair - 20% 2) Adjacent to surface tidal water - No Good 20% Poor - MO% Distance - 1.75 miles 3) Tidal Water Capability 3 (Great Bay) 4) Adjacent to surface fresh water - Yes Distance - on site 5) Adjacent to Aquifer - No Distance - .75 miles E. Utilities and Services 1) Distance to nearest major water hookup .6 miles What town(s) does this hookup serve - Greenland, New Castle, Newington, Portsmouth and parts of Rye 2) Distance to nearest sewer hookup - 2.88 miles What town(s) does this hookup serve - Portsmouth 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line 34.5 KV line 4) Gas Pipeline; Distance to nearest gas main - .69 miles Type of gas main - Granite State gas line Distance to Granite State gas transmission line - .69 miles F. Transportation 1) Highway; Type of road which services or is nearest to site town roads Distance to primary road - .5 miles 2) Railroad; site serviced by rail - No Distance to active rail line - 1.19 miles TOWN: STRATHAM A. Site st-4 B. Size - Approximately 845 acres C. Current Status 1) Existing Land Use: Woodland 30% 2) Zoning Status: Residential-Agricultural - 75% Agricultural - 55% Commercial - 25% Residential - 5% Abandoned Land - 5% Wetlands - 5% D. Land and Water Resources 1) Land Capability: Excellent - 65% Fair - 10% 2) Adjacent to surface tidal water - No Good - 5% Poor - 20% Distance - .3 miles 3) Tidal Water Capability - 4 (Squamscott River) 4) Adjacent to surface fresh water - Yes Distance on site 5) Adjacent to Aquifer - Yes Distance - site borders an aquifer E. Utilities and Services 1) Distance to nearest major water hookup - .63 miles What town(s) does this hookup serve - Exeter 2) Distance to nearest sewer hookup - .55 miles What town(s) does this hookup serve - Exeter 3) Utilities Available; Distance to nearest major transmission line on site Type of transimission line - 115 KV line 4) Gas Pipeline; Distance to nearest gas main - adjacent to site Type of gas main - Granite State gas line Distance to Granite State gas transmission line adjacent to site F. Transportation 1) Highway; Type of road which services or is nearest to site - primary road (State Highway 101) Distance to primary road - on site 2) Railroad; Site serviced by rail - No Distance to active rail line - .38 miles A0 TOWN: STRATHAM A. Site - st-5 B. Size - Approximately 405 acres C. Current Status 1) Existing Land Use: Agricultural - 40% 2) Zoning Status: Residential-Agricultural 100% Residential - 5% Abandoned Land - 10% Woodland - 45% D. Land and Water Resources 1) Land Capability: Excellent - 55% Fair 15% 2) Adjacent to surface tidal water - No I Good - 10%. Poor 20% Distance -2.5 miles 3) Tidal Water Capability - 4 (Squamscott River) 4) Adjacent to surface fresh water - Yes Distance On site 5) Adjacent to Aquifer Yes Distance - site borders an aquifer E. Utilities and Services 1) Distance to nearest major water hookup .7 miles What town(s) does this hookup serve - Hampton, North Hampton, and parts of Rye 2) Distance to nearest sewer hookup - 2.75 miles What town(s) does this hookup serve - Exeter 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line - 115 KV line 4) Gas Pipeline; Distance to nearest gas main - on site Type of gas main - Granite State gas line Distance to.Granite State gas transmission line - on site F. Transportation 1) Highway; Type of road which services or is nearest to site town roads Distance to primary road - 1.75 miles 2) Railroad; Site serviced by rail - No Distance to active rail line - 2.06 miles TOWN: STRATHAM A. Site st-6 B. Size Approximately 310 acres C. Current Status 1) Existing Land Use: Residential - 15% 2) Zoning Status: Residential-Agricultural 100% Woodland - 25% Agri cul tural - 60% D. Land and Water Resources 1) Land Capability: Excellent - 45% Fair - 10% 2) Adjacent to surface tidal water - No Good - 35% Poor - 10% Distance - 1.25 miles 3) Tidal Water Capability - 4 (Squamscott River) 4) Adjacent to surface fresh water - Yes Distance .13 miles (Dearborn Brook) - to Aquifer - Yes 5) Adjacent Distance - site borders an aquifer E. Utilities and Services 1) Distance to nearest major water hookup - .02 miles What town(s) does this hookup serve - Exeter 2) Distance to nearest sewer hookup - .4 miles What town(s) does this hookup serve - Exeter 3) Utilities Available; Distance to nearest major transmission line 1.25 miles Type of transmission line - 115 KV line 4) Gas Pipeline; Distance to nearest gas main - .5 miles Type of gas main - 2 inch high pressure gas main Distance to Granite State gas transmission line - .5 miles F. Transportation 1) Highway; Type of road which services or is nearest to site town roads Distance to primary road - .38 miles (State Highway 101) 2) Railroad; site serviced by rail - No Dil.stance to active rail line - 1.31 miles SITES Outline Used for Data on Specific Sites: A. Approximate Location of Site Map Reference B. Size (acres) C. Current Status of Site 1. Existing Land Use % of land in each category, if more than one 2. Zoning Status Ownership Approx.imate number of owners, if more than one D. Land and Water Resources 1. Land Capability Classification % of land in each category, if more than one 2. Adjacent to Surface Tidal Waters Distance 3. Tidal Water Capability 4. Adjacent to Surface Fresh Water Distance 5. Adjacent to Aquifer Distance Potential Quantity and Quality-.of Water in Tq-uifer E. Utilities and Services 1. Harbor Facilities Available 2. Type of Facilities and Activities 3. Potential for Expansion of Existing Harbor or New Harbor 4. Municipal Water Available Distance to Nearest Source Amount of Surplus Water Available 5. Municipal Sewer Available Distance to Nearest Hookup Type of Sewage Treatment -;. ExTe-ss Capacity 6. Utilities Available Distance to Nearest Hookup F. Cost Factors 1. IMu.nicipal Tax Rate (Equalized) 2. County Tax Rate (Equalized) G. Transportation 1. Highway--Type of Road Which Services or is Nearest to Site Distance to Primary Road 2. Railroad--Site Serviced by Rail Line Distance to Active Rail Line'' 3. Port--Distance to Existing or Potential Port Facilities' 4. Gas or Oil Pipeline--Pipeline Available Distance H. Comments PORT OF PORTSMOUTH/NEWINGTON A 35-foot channel was completed along the Piscataqua River in February of 1969 by the Army Corps of Engineers. It extends from deep water in Portsmouth Harbor to a point about 1700 feet above the Atlantic Terminal Sales Corporation in Newington. The channel is 400 feet wide with additional width at the bends, a 950 ft. turning basin above Boiling Rock and an 850 ft. turning basin at the head of the project. The Corps of Engineers is presently studying the economic feasibility of a deepening and widening operation in the harbor. Improvements under consideration include enlarging the turning basins and removing ledge rock near the U.Si Naval Base by Goat Island and in New Castle. At present the largest vessel that can be brought up the river is a 700 ft., 40,000 ton ship. The Piscataqua River has a mean tide range of 7.8 feet and a spring range of 9 feet. Four miles from its beginning the river receives discharge from the tidal basin consisting of the Great Bay and its tributaries, causing a strong current of 7-9 knots. This combination of tides and currents makes navigation on the Piscataqua hazardous. Ships up to 200 feet can come and go as they please. Otherwise the current restricts traffic to four slack tides in a 24 hour period; 2 high and 2 low. Each slack tide period lasts approximately three hours for ship movement purposes. Due to low tide channel depths, ships drawing a draft of 35 feet or more must enter port on a slack high tide, necessitating waiting periods up to ten hours. Most of the ships using the river for commercial pur oses have to be brought upstream by the Portsmouth Navigation Piloting Company. Portsmouth Cigation operates a total of four tugs. The number of tugs needed to bring a ship up the river is determined according to the size and age of the ship, and how heavy a load is being carried. Freighters are usually brought up the river by one tug, ships up to 26,000 tons by two tugsand ships over 26,000 tons by 3-4 tugs. (Barges don't need tugs at all.) Three bridges span the Piscataqua River. The tugs have to position the larger ships to clear the Memorial and Maine-New Hampshire lift bridges. The Maine-New Hampshire bridge is constructed at such an odd angle.to the river channel, that ships must pass under at a 45 degree angle to the bridge. This narrows the workable horizontal clearance to 90-95 feet and the tugs can't pass through with large ships that they are guiding. (Three to five years ago an Army Corps of Engineers harbor dredge cracked up against the bridge due to a strong current.) The Interstate 95 bridge further upstream is a newer fixed span bridge with adequate clearance for al.1 vessels using the river. COMMENTS - The port costs of the Piscatdqua River are high due to unusually swift currents which necessitate the use of tugs and delays up to 10 hours waiting for slack tides. Ships over 500 feet can only be brought upstream on 2 tides and competition for the limited numberof tugs can cause further delays. - For the most part, ships don't move on the river when there isfog. The radar reportedly doesn't work in the confined area of the river when the current moves the vessel from side to side. - Bridge lift failures, sometimes caused by ice storms or power failures, can result in even fewer ships being moved in a single 24-hour period. Lill E L 1 0 T P T, ATLANTIC ?fR-'L SALCS CORP. 3 -FOOT F> CHANNEL '@':35-FOOT %IUKNINU. M A I N E,'(.'- BASIN .1w E-GLANO TANK I- INDUSTRIES of R... 95 SIMPLEX WIRE 8 6 CABLE CO. 00. ".j-801LING ROCK N E W I N 6 T 0 N PUBLIC SE@RV-Cr. CO. OF N.N SPR GVE COAL 0 OIL 1@91Y SOCOMY MOBIL OIL CO.. .11 wA 00 - I - FLOATING POWER PL!NT RtSl TANCE ITTERry ES, '0 STANDARO OIL CO. NATIONAL GYPSUM CO. x H. POR ER lill AUTMORITY COLEMAN OIL CORP. G.A.111 ITATI L CORP. \,-M Aff.-L N E W I/ \\@. tull') H A M P S H I R E CN 95 PORTSMOUTH7 BRIDGE CLEARAN CES MEMORIAL BRIDGE (LII TT) HOR. 260 FT. VERT, 150 FT. ME.- N.H. BRIDGE (LIFT) CHANNEL 6-FEET DEEP-SHAPLEIGH HOR. 200 FT. ISLAND TO LITTLE HARBOR VERT. 135 FT. 1-95 HIGHWAY BRIDGE (FIXED) CHANNEL 6-F.EET DEEP, AND I-IoR. 440 FT. ANCHORAGE-IN SAGAMOPr CREEK 135 FT. 0. NEW CASTLE HIGHWAY'@RIDGE OCULE) GENERAL SULLIVAN BRIDGE (FIXED) 'f, ev H OR. 29 FT. CK -Pl:', -90 CorporaLtioNr 81611 tv vr @,TANKEP, P" r5. Wssons- With d(pt I fadftfi@s iN 1: AL'-% CMW[PrNI) TAN It 'n LOADIN6 DOCK- UN '&L DIN Ail VL 'Sp ROM AND 6K bj & C to PS A -M NrE T FhW OX UPC J1 ial harbor facilities on the Piscataqua River C5,L *Commerc C.H. SPRApue nN6 SON CO. A fwiKe 6 *or-K h ANdl (NO, b0NK6K C 0 to Ot -May, ship 51%ze Cog-0-17coft- - apppwx '25 5hjPS1yF1.' - CaN ONiq D6 056D Wh6N MOO 00 cbcj@ New 6tq ANJ Pe iS VAMNt Hamp5t 0565, lvahoNw ,.j -approx. to- 1z MObil OIL MU. shlp size. r,,?o ft Na6oNA 6 _%CPrjr0o)nN 1@6 056D Wh6W -5PRAqU6 docl-C ej@@ VACAN t Caissons facO, abaNdonED )Ye w H t M r Ne 5(14,61 nCL)(I P rylaKene M 4oo f@. maizq1*PJA1 ION AND UNCI @e MO.)(. ship R], ib 4e flantic Lei Mi "4ts V0 J Acr6s Nth % % MCL)(. Ship VRO616M v T, It come e hyistiart emans @37 41 *hor M) in bur 4". dgt -Bersurn 76, ad 4 Commercial facilities located on t X me River in Portsmouth rin 4r M'&ial - Ch Bridgi 'e f 1.1 % Sub 'IVA 0 0 a S. Ie @V Q@ entwo h C S chri-ti Faci 11 ty: Temporary Service Base/ Platform or Pipeline Instal- bu lation Service Base A. Approximate Location of Site The New Hampshire Port Authority Marine V4.Cl --l on NoBle -T-sTand, 4 miles upstream Termina SCat ri 1.0 -C from the mouth of the Piscataqua River. Located in the primary zone in-Portsmouth. 0 ran B. Size Approximately 14 acres C. Current Status of Site 1. ExistingLand Use Harbor and Dock Facilities 2. Zoning Status Industriall 3. Ownership The State of New Hampshire owns all of the site except the Boston and Maine Rail 4- -J, The New Hampshire Port Authority manages the terminal and has leased the right to maintain and operate the premises to John T. Clark and Son of New Hampshire, for 5 year renewable periods since 1969. D. Land and Water Resources 1. Land Capability Classification Urban 100% 2. Adjacent to surface tidal waters Yes- - Distance - situated on the Piscataqua River, Immediately downstream from the entrance to the North Mill Pond. 3. Tidal Water Capability - Piscataqua River - 2 - North Mill Pond - 3 4. Adjacent to surface fresh water No 5. Adjacent to Aquifer - No - Distance - The site is located approximately 2.75 miles from a kame plain which underlies Pease Air Force Base, extending from Portsmouth into Newington. Another ice-contact deposit lies within 3 miles of the site, south of Banfield Road between Sagamore Creek and the Rye town line. - Potential quantity and quality of water in aquifers The Portsmouth-Newington kame plain presently provides water for the Pease Air Force Base. The City of Portsmouth has only limited access to this source and the city's water department has yet to complete studies of the quality and potential of this supply. The ice-contact deposit between Sagamore Creek and the.Rye town line has been subject to Antensive gravel pit operation in the past, eliminating this area as a valuable aquifer. Probably only small supplies of ground water, enough for domestic use or small-scale commercial use, can be obtained from this source. E. Utilities and Services 1. Harbor Facilities Available - The Port Authority Terminal has a marginal wharf, 304 feet long and 47 feet wide which can handle ships up to 650-700 feet. The wharf is constructed of reinforced concrete and is set offshore and connected by bridges to the shore at each end. A wharehouse is parallel to the wharf onshore; it is a 182 X 60 ft. steel frame structure with aluminum siding on a concrete slab. The structure presently contains the Port Authority office, a high-meat inspection room and warehousing, part of which is used for vehicle maintenance and storage. - Anchorage for large vessels can be found anywhere on the east and north sides of the channel, between Wood Island and Clar Island, in depths of 48 to 68 feet. 2. Type of Facilities and Activities - Since 1969 an average of 42,000 tons per year of steel scrap, lumber, fish, meat products and assorted general cargo has boved through the Port Authority Terminal. - There has been no significant growth or decline of movement. Imports have consistently exceeded exports by approximately 9:1 and the wharf has been occupied only about 17% of the time. 3. Potential for Expansion of Existing Harbor or New Harbor - A project to extend the existing wharf 275 feet upstream was authorized by the Legislature in 1975 and is expected to be completed in 1977. - A number of studies have explored the potential for expanding the Port Authority facilities. Feasibly a new 600 foot long wharf structure could be constructed downstream of the existing wharf. The existing wharf could then be extended to meet the new 600 foot section, providing 750 feet of berthing along the present wharf. Finally, the 600 foot section could be extended to the property line at Granite State Minerals (downstream from the site), resulting in a maximum berthing length of approximately 870 feet. 4. Municipal Water Available - Yes - Distance to nearest hookup - The Portsmouth Municipal Water System supplies water to the site through a 6 inch line. - Amount of surplus water available - The Portsmouth Municipal Water System is presently operating at nearly full capacity. The sustainable yield of supply is 5.8 mgd, with current daily use averaging 5.5 mgd. 5. Municipal Sewer Available Yes Distance to nearest hookup The site is serviced by an 18 inch sewage line which is part of the Portsmouth Municipal Sewage @y-s-tem. - Type of sewage treatment - Primary. Facilities for secondary sewage treatment are presently in the planning stages. It is expected that it will take at leas' 10 years to 1) build facilities for the 10% of the sewage which is being put directly in the river 2).complete the separation of sewage from stormwater and 3) change treatment from primary to secondary. - Excess capacity - The Portsmouth'Munici2al SLiWaIge System is currently operating at MLLly- full capacity. The present sewage treatment plant is designed le 1.5-mgd hit actually handles closer to 2.5 mgd, the amount varying with weather conditions. This is a combined system which necessitates outfalls into the river when the system overloads. 6. Utilities Available - Yes - The Jackson Hill transmission substation is approximately .5 miles from the site. Two 34.5 KV transmission lines run out of this substatim. F. Cost Factors 1. 1975 Municipal Tax Rate (Equalized) - Portsmouth - 35.64/1,000 evaluation 2. 1975 Rockingham County Tax Rate (Equalized) - 24.73/1,000 evaluation G. Transportation .1. Highway - Type of raod which services or is nearest to site Market Street (prima ry), provides access to the site. Market Street is a 4-lane divided roadway and enables truck traffic to use the terminal without going into Downtown Portsmouth. - Distance to Primary road Both Interstate 95 and US 1 art-withih -.-5 miles of the site via Market.Street. 2. Railroad Site serviced by rail line Yes Distance to active rail line - The Boston and Maine has a line which passes through the rea -r Ug-e- t o r @a c h tFe7_N -av al -fa c i I i t i e s -on S e a v ey I sTa-n F of the site and crosses the Interstate r @-nd-YfftE'ry, Maine. There are 2 sidings on the property and a spur from the main line con- tinues along the New Hampshire side of the river, ending at Newington. 3. Port Distance to existing or potential port facilities - The site is a port with facilities. Oil or Gas Pipeline A 4 inch high pressure gas main is approximately .63 miles southeast of the site. The Granite State Gas Transmission Line runs approximately 1.767-mliTe-ssouthwest of the site. H. Comments - One bridge required passage to the Port Authority Terminal. This is the Memorial Highway Bridge at Badgers Island, located about 3.5 miles above the mouth of the river. - Due to the swift current, ships are brought up,.-the river by the River Pilot and with the aid of tugs,. The site is generally well-suited for a temporary service base or a platform or pipeline installation service base. Not only are the required land andharbor requirements met by existing facilities, but these facilities are presently underutilized. The site is serviced by a number of transportation alternatives. Market Street (primary) provides ready access to Interstate 95 and a line of the Boston and Maine passes right through the site. There are definite limits to the maximum expansion potential of the s ite. The site could only be- expanded to a total of 20 acres, and that would require dredge and fill operations in an environ- mentally sensitive marsh upstream of the site. Otherwise the site is locked in by commercial and industrial land users with adjacent owners including Mark Noble, Coleman Oil Co., Inc., Portsmouth Housing Authority, David Mahoney (Granite State Minerals), Boston and Maine Railroad and the State Water Supply and Pollution Control Commission (pond and marsh). Notes: I Permitted uses include building and lots for assembling, fabrication, manufacturers, packaging or processing.operations. 7, 7amike- Pmk e? VY V6 + @tx UV-D C, 4 00 Tattftw Pak OSO MO@il OfL N0 V '0 h entw Acr' A 5eAcreit, V hrist 0? i $ho Faci I i ty: Pipecoating Yard bu A Location - An area in the northern Pa t of Portsmouth extending between the Newington town Line and the Pis- cataqua-River. The site is located 1,0 Cat ri in the primary and secondarvzones, B. Size ran i-h Approximately 150 acres C. Current Status of Land Use 1. Existing Land Use - Abandoned Land - 50% - Residential - 25% J - Woodland - 20% Industrial - 5% 2. Zoning Status The northern part of the site from the Newington town line to the coastline on River is zoned for Industrial use. The rest of the site is divided between G General Business3 and some Garden Apartments4. 3. Ownership Approximate number of owners 20 plus the Boston and Maine Railroad which owns riqhts-of way. D. Landand Water Resources 1. Land Capability Classification - Excellent - 4'0% - Urban - 25% 8Z61 - Poor - 25% - Fair - 10% 2. Adjacent to Surface Tidal- Waters Yes.* Distance The site borders on the PitcataddA'RiVer 3. Tidal Water Capability - Piscataqua River - 2 3NO ILE RAW 4.. Adjacent to Surface Fresh Water - No 5. Adjacent to Aquifer - No -.Distance - The site is located within*1.5 milps of a Kame plain which underlies Pease Air Force Base, extending from Portsmouth into Newington. Another ice contact deposit lies within'3.5 miles of the site, south of Banfield Road between Sagamore Creek and the Rye town line. Potential Quantity and Quality of Water in Aquifer - The Portsmouth-Newinqton kame plain presently provides water for the Pease Air Force Base. The City of Portsmouth has only limited access to this source and the city's water department has yet to complete studies of the quality and poten- tial of this supply., The ice-contact deposits between Sagamore Creek and the Rye town line have been sublect to intensive gravel pit operation in the past, eliminating this area as a valuable aquifer. Probably only small supplies of groundwater, enough for domestic use or small-scale commer- cial use, can be obtained from this source. E. Utilities and Services 1. Harbor Facilities Available There are 2 caissons off the coastline of this site which were used as docking facilities for 2 float ing electrical power generating statf' ns, known as the "S.S. Resistance". The facili is not being used now and could he used to dock a small 3-40n ft. ship. Directly upstream of the site, in Portsmouth, are 2 tanker docks.. One is used by Mobil Oil in connection with the Mobil tank farm over the Newington border. It handles ships up to 680 ft. long. Further upstream is a 640 ft. T-head wharf used by C.H. Spraque and Son Co. This facility takes on ships up to 700 ft. lonq. 2. Types of Facilities and Activity - The 2 caissons off of the site are not presently beinq used as 6 docking facility6. - The facilities used by Mobil Oil and C.H. Spraque and Son Co. handle approximately a dozen ships and 2 dozen ships a year, respectively. Only one of the two facilities can be used at a time due to the proximity of their locations. Both are tanker docking facilities and are used exclusively to handle oil and gas. 3. Potential for Expansion of Existing Harbor or New Harbor - The 2 caissons off of the site mark a location where there is some potential for dockinq facilities. - Downstream from there the Piscataqua River narrows in relation to the channel and it would be impossible for a ship to dock and meet the requirements laid down by the Army Corps of Enaineers. Further downstream is the Atlantic Heights residential section which, due to ledge elevations, is not suitable for marine use. 4. Municipal Water Available - Yes Existing facilities upstream of the site, presently used by Mobil Sprague have the potential for increased use and/or expansion. Distance to Nearest Hookup - The Portsmouth municipal water system line crosses the site alonq Woodbury Avenue and@bordert the site on the northwest along Gosling Road- Amount of Surplus Water Available - The Portsmouth municipal water system is presently operating at nearly full capacity. The sustainable yield of supply is 5.8 mgd, with current daily use averaging 5.5 mgd. 5. Municipal Sewer Available - Yes Distance to Nearest Hookup - The southern half of the site is serviced @y the Portsmouth Municipal Sewer System, using the Gosling Road lift station. - Type of Sewage Treatment Primary - Facilities for secondary sewage treatment are presently in the planninq staqes. It is expected to take at least 10 years to 1) build facilities for the 10% of the sewage that is beinq.put directly into the river, 2) complete the separation of sewage from waste water and 3) change treatment from primary to secondary. Excess Capacity - The Portsmouth system is currently operating at nearly full capacity. The present sewage treatment plant is designed to handle 1.5 mgd and actually handles closer to 2.5 mgd, the amount varying with weather conditions. This is a combined system which nocessi- tates outfans into the river when the systemoverloads. 6. Utilities Available Yes Distance to nearest hookup A 34.5 KV transmission line and two 115 KV transmission lines run along the Spaulding Turnpike, within .5 miles of the site. F. Cost Factors - 1975 Municipal Tax Rate (equalized) - 35.64/1,OnO evaluation. - 1975 Rockingham County Tax Rate (equalized) 24.73/1,000 evaluation. G. Transportation 10 Highway Type of Road Which Serves or is Nearest to Site The site is served by Gosling Road (secondary), with possible access into the site on a private drive used by Sprague. Woodbury Avenue (secondary), runs through the southern part of the site. Distance to Primary Road - Gosling Road connects with the Spaulding Turnpike approximately .75 miles from the site. Interstate 95 is 1.5 miles east via the Spauldinq Turnpike. 2, Railroad - Site Served By Railroad Yes - Distance to Active Rail Line The Boston and Maine Railroad Crosses the northern part of the site, alongside the coastline. 3. Port - Distance to Existing or Potential Port Facilities Site has coastline with access to potential port facilities, 4. Oil or Gas Pipeline - Pipeline Available Yes - Distance - A 2-inch high pressure gas main runs through the site along Woodbury Avenue and adJacent to the site along Gosling Road. The Granite State Gas transmission line is approxi- mately .25 miles southwest of the site. H, Comments - There are a variety of soils,found within this site. The northeast section along the Piscataqua River is classified as made land, which consists of areas that have been excavated or filled in. The soils within the rest of the site are either well-drained Glouster soils which are suitable for development or poorly-drained Biddeford or Scarboro soils, poorly suited for development. Development capability is most limited in the middle of the site. - The site has a number of transportation alternatives. A line of the Boston and Maine runs through the northern part of the site, Interstate 95 is accessible.approximately 2.25 miles from the site via Gosling Road and the Spaulding Turnpike and the site has coastline on the Piscataqua.River. However, the coastline belinging to the site is limited and distant from other points in the site. There i:s-. some potential for the use of harbor facilities either along the site or upstream, but the amount of this potential has yet to be determined. - Three bridges require passageenroute to this site.. ............................... lPermitted uses are buildings and lots Used for assembling, fabrication, manufacturers, packaging or processing operations. 2Permitted uses are residences with up to 4 families per dwelling, renting not more than 2 rooms in a I or 2 family dwelling, housing.for the elderly, lodges, clubs and other non-profit concerns. 3 Permitted uses are religious institutions, municipal and public utility structures, retail stores .and consumer services, real estate offices, trade, craft, and general service, undertaking or funeral homes, theatres, restaurants, hotels, motels, recreation areas, amusement areas, and the like. 4Permitted uses are 1 or more dwellings with provisions for 4 or more families, recognized professions ssessory to the dwellings and the like, Dock/ 6 S I NV U-56D 8Y C-H-SPEA06 Sub -rAIVK9?- POCK- 0 .0811- 01L OW j3Y rt' N h Ac Fa c i I i ty: Permanent Service Base hri A. Location bu Northern tip of Portsmouth, between the Portsmouth-Newington boundary and the Piscataqda,River. Located in the rimary and secondary zones, in Portsmouth. S t Ca trin 40 --Ch B. Size - Approximately 95 acres. ra ntj C. Current Status of Land Use 1. Existing Land Use Abandoned land - 60% Woodland - 15% Residential - 15% Industrial - 10% 2. Zoning Status From the Newington'town line to the coastline of the Piscataqua River, the si Industrial.1 the leg of the site, west of Seacrest Village is zoned General General Business.3 3. Ownership Approximate number of owners 3 (New Hampshire Public Service Corp C.H. Sprague and Son Co. and Marlon Frink) Tlus the Boston and Maine Railroad w rights-of-way. D. Land and Water Resources 1. Land Capability Classification - Excellent - 55% - Urban - 25% - Fair - 10% - Poor - 10% 2. Adjacent to Surface Tidal Waters Yes Distance The site has coastline on the Piscataqua River. 3. Tidal Water Capability - Piscataqua River 2. 4. Adjacent to Surface Fresh Water - No 5. Adjacent to Aquifer - No Distance The site is located within 2 miles of a kame plain which underlies Pease Air Force Base, extending from Portsmouth -N-to-N-ewington. Another ice-contact deposit lies within 3 miles of the site, south of Banfield Road between Saqamore Creek and the Rye town line. Potential Quantity and Quality of Water in Aquifer - The Portsmouth-Newington kame plain presently provides water for the Pease Air Force Base. The City of Portsmouth has only limited access to this source and the city Is water department has yet to complete studies of the quality and potential of this supply. The ice-contact deposits between Saqamore Creek and the Rye town line have been subJect to intensive,gravel pit operation in the past, iliminatinq this area as a valuable aquifer. Probably only small supplies of groundwater, enouqh for domestic use or small-scale commercial use, can be obtained from this source. E. Utilities and Services 1. Harbor Facilities Available There are 2 caissons off the coastline of this si-te which were used as docking facilities for 2 floating electrical power-generating stations, known as the I'S.S. Resistance". The facility is not being used now and could be used to dock a small 3-400 ft. ship. Directly upstream of the site, in Portsmouth, are 2 tanker docks. One is used by Mobil Oil Jn connection with the Mobil tank farm over the Newington border, It handles ships up to 680 ft. long. Further upstream is a 640 ft. T-head wharf used by CA'Spraque and Son'Co. This facility takes on ships up to 700 ft. long. 2. Type of Facilities and Activity - The 2 caissons off the site are not presently being used as a docking facility. - The.facilities used by Mobil Oil and C.H. Sprague and Son Co. handle approximately a dozen ships and 2 dozen ships a.year, respectively. Only one of the two facilities can be used at a time due to the proximity of their locations. Both are tanker docking facilities and are used exclusively to handle oil and gas. 3. Potential for Expansion of Existing Harbor or New Harbor The 2 caissons off of the site mark a location where there is some potential for docking facilities. Downstream from there the Piscataqua River narrows in relation to the channel and it would be impossible for a ship to dock and meet the requirements laid down by the Army Corps of Fnqineers. Further downstream is the Atlantic Heights residential section which, due to ledge elevations, is not suitable for marine use. Existing facilities upstream of the site, presently used by Mobile and Sprague have the potential for increased use and/or expansion. 4. Municipal.Water Available - Yes - Distance to Nearest Hookup - A Portsmouth Municipal Water Line runs along Woodbury Avenue and Gosling Road between Portsmouth and Newington.', - Amount of Surplus Water Available - The Portsmouth municipal water system is presently operating at nearly full capacity. The sustainable yield of supply is 5.8 mgd, with current daily use averaging 5.5 mgd. 5. Municipal Sewer Available - Yes Distance to Nearest Hookup Part of the site, between Seacrest Village and Woodbury Avenue is serviced bythe Portsmouth Muhici 61 Sewer System. Type of Sewage Treatment - Primary - Facilities for Secondary Sewaqe treatment are presently 1n the planning stages. 'It is expected to take at least In years to 1) build facilities for the 10% of the sewage that is being put directly into the river, 2) complete the separation of sewage from wastewater and 3).change treatment from primary to secondary. 0 Excess Capacity The Portsmouth Municipal Sewer System is currently operatinq. at nearly full capacity. The present sewage treatment plant is designed to handle 1.5 mqd and actually handles closer io 2.5 mgd, the amount varying with weather conditions. This is a combined system which necessitates outfalls into the river when the system overloads. 6. Utilities Available - Yes Distance to Nearest Hookup A 34.5 KV transmission line and two 115 KV transmission lines run along the Spaulding Turnpike, within 225 miles of the site. F. Cost Factors - 1975 Municipal Tax Rate (equalized) - 35.64/1000 evaluation - 1975 Rockingham County Tax Rate (equalized) - 24.73/1000 evaluation G. Transportation 1. H i g hway Type of Road which Serves or is Nearest to Site - The site is served on the northwest side by Gosling Road (@. and a light duty road which provides access to the Sprague Oil area and the coast. The site is bordered to, the south by Woodbury Avenue (secondarz . 2. Railroad - Site served by Railroad - Yes - Distance to Active Rail Line - A line of the Boston and Maine passes through the northern part of the site, along the coastT156e. 3. Port Distance to Existing or Potential Port Facilities Site has coastline with access to port facilities. 4. Oil or Gas Pipeline - Pipeline Available Yes - Distance - A 2 inch high pressure gas main runs along Woodbury Avenue and Gosling Road, adjacent to the site. A 6 i'nch high pressure gas main which services the Schilk Plant, also runs along Gosling Road. The Granite State Gas transmission line is .5 miles southwest of the site, along the Spaulding Turnpike. H. Comments A.rezoning proposal is presently being considered for Seacrest Village. The Portsmouth Economic Development Commission is studying the possibility of converting the area to industrial use. Seacrest Village comprises 129 acres adjacent to this site on the southeast. - The site occupies the only piece of available waterfront in Portsmouth. It is however, not an optimal piece of land because of the limited amount of coastline and the residential development which surrounds it. Basically, this site is squeezed into existing space to meet the locational requirements of the facili.ty. - There are harbor facilities avcAilable for this site, but the extent of their potential has yet to be determined. The northeastern section of the site bordering the river, is composed of made land. The site slopes down to the river where there are 2 caissons offshore. Cliffs border the coastline from there downstream to Atlantic Heights. The predominate soil within the rest of the site is a well- drained Glouster which is generally suited for development. Erosion control may be necessary, however, where the land slopes. Also there are pockets of poorly drained Biddeford and Scarboro soils, where development would be severly limited. Three bridges require passage enroute to this site. .............. ......... 'iPermitted uses are buildings and lots used for assembling, fabrication, manufacturers, packaging or processing operations. 2Permitted uses are res idences with up to 4 families per dwelling, renting not more than 2 rooms in a 1 or 2 family dwelling, housing for the elderly, lodges, clubs and other non-profit concerns. 3Permitted uses are religious institutions, municipal and public utility structures, retail stores and consumer services, real estate offices, trade, craft and genreal services, undertaking or funeral. homes, theatres, restaurants, hotels, motels, recreation areas, amusement areas, and the like. j -3; Tavikeor I)mk- '52 Ot L@ i. - Sub 0 Gas fi t 0 entw h kRc 0 A3 A 0 '@44- vat- $ho bu Facil ity: Pipecoating Yard A. Approximate Location of Site A noncoastal area in the northern part of u--th, near the Newington town -t Cat ri kO h line. The site is located in the secondary zone, ran B. Size - Approximately 135 Acres c74@ C. Current Status of Site 1. Existing Land Use - Woodland 60% - Residential 20% - Abandoned Land 10% Wetland 10% % 2. Zoning Status A The western third of the site is zoned for Industrlall'us@e The rest-is divid General Residence2, General Business3 and Garden Apartment;4. 3. Ownership Approximately 25 owners 0 D. Land and Water Resources .1. Land Capability Classification - Excellent - 70% - Poor - .30% 20 Adjacent to Surface Tidal Waters.- No Distance - .5 miles to the Piscataqua River 3. Tidal Water Capability Piscataqua River 2 4. Adjacent to Surface Fresh Water No 5. Adjacent to Aquifer - No Distance - The site is located approximately'l.*5'rhiles from a kame plain which underlies Pease Air Force Base extending from Portsmouth into Newington. Another ice-contact deposit lies within 3 miles of the site, south of Banfield Road, between Sagamore Creek and the Rye town line. Potential quantity and quality of water in aquifers The Portsmouth-Newinqton kame plain presently provides water for the Pease Air Force Base. The City of Portsmouth has only limited access to this source and the city's water department has yet to complete studies of the quality and potential of this source. The ice-contact deposits between Sagamore Creek and the Rye town line have been subject -to intensive gravel pit operation in the past, eliminating this area as a valuable aquifer. Probably only small supplies of groundwater, enough for domestic use or small-scale commercial use, can be obtained from this source. E. Utilities and Services 1. Harbor Facilities Available The site is approximately .5 miles southwest of the nearest harbor facilities on the Piscataqua. River. These include 2 caissons, previously used to dock the "S.S. Resistance", which can handle a small 3-400 foot ship and 2 tanker docks, one used by Mobil Oil and the other by C.H. Sprague and Son Co. The Mobil facility handles ships up to 680 feet and the 640 T-head wharf used by C.H. Sprague and Son Co. takes on ships up to 700 feet long. 2. Type of Facilities and Activities The 2 caissons previously used to dock 2 floating electrical power generating stations, the J'S.S. Resistance", are not presently being used as a docking facility. The facilities used by Mobil Oil and C.H. Sprague and Son Co. handle approximately a dozen and two dozen ships a*year, respectively. Only one of the two facilities can be used at a time due to the proximity of their locations. Both are tanker docking facilities and are used exclusively to handle oil and gas. 3. Potentail for Expansion of Existing Harbor or New Harbor - The 2 caissons mark a location where there may be some potential for docking facilities. - The facilities used by Mobil and Sprague have the potential for increased use and/or expansion. 4. Municipal Water Available - Yes Distance to nearest hookup - The site is serviced by the Portsmouth Municipal Water Supply System, A municipal water line crostet'the'tite along Woodbury Avenue and another borders the site along the Spaulding Turnpike. Amount of Surplus Water Available - The Portsmouth municipal water system is presently operating at nearly full capacity. The sustainable yi.eld of supply is 5.8 mgd, with current daily use averaging 5.5 mgd. 5. Municipal Sewer Available Yes - The eastern half of the site is serviced by the Portsmouth Municipal Sewer System, using the Gosling Road lift station. - Type of Sewage Treatment - Primary. Facilities for secondary treatment are presently in the planning stages. It is expected 'i take at least 10 years to 1) build facilities for the 10% of the sewage that is being put directly into the river, 2) complete the separation of sewage and stormwater and 3) change treatmentfrom primary to secondary. Excess Capacity - The Portsmouth sewage sXstem is currently operating at nearly full capacity. The present sewage treatment plant is designed to handle 1.5 mqd and actually handles closer to 2.5 mqd,,the amount varying with weather conditions. This is a combined system which necessi- tates outfalls into the river when the system overloads. 6. Utilities Available - Yes Two 115 KV transmission lines and a 34. 1 transmission line run along the Spaulding TurnDlLklel, which is adjacent to the site. F. Cost Factors ly 414 b4' Y U - 35.64/l,nnO evaluation - 1975 Portsmouth Municipal Tax Rate (equalized) 1,411 340i - 1975 Rockingham County Tax Rate (equalized) 24.7311,000 evaluation G. Transportation 1. Highway - Type of Road Which Services or is Nearest to Site Woodbury Avenue, a secondary road, and the Spaulding Turnpike, a primary road, service the site. - Distance to Primary Road The Spaulding Turnpike connects to Interstate 95, approximately .5 miles to the east, 2. Rai7raod Site Serviced by Rail Line - No Distance to Active Rail Line - the Boston and MAihe'hat A line along the Piscataqua River, approximately .5 miles north of the site. 3. Port Distance to Existing or Potential Port Facilities Port facilities on the Piscataqua River are within .5 miles of the site. 4. Oil or Gas Pipeline - Pipeline Available Yes - The Granite State Gas transmission line runs along the Spaulding Turnpike, adjacent to the site. A 2 inch high pressure gas main runs along Woodbury Avenue. H. Comments The site does not have waterfront or immediate access to an existing rail line. However, it is one of the few large tracts of land of generally excellent development capability, relatively near the Piscataqua. River. In addition, a large portion of the site is already zoned for Industrial use. The Glouster soil within the site is generally well-drained and suited for development. However, some erosion control may be necessary on the steeper slopes. There is also a band of poorly drained Biddeford and Scantic soils, where developm would be severly limited. The New Hampshire Port Authority Marine Terminal which presently has 304 feet of marginal wharf, is approximately 3 miles from the.site via primary roads, Three bridges require passage enroute to this site, ..................... ........ ...... lPermitted uses include buildings and lots used for assembling, fabrication, manufacturers,. packaging or processing operations. 2Permitted uses-are residences with up to 4 families per dwelling, rentinq not more than 2 rooms In. a I or 2 family dwelling, housing for the elderly, lodges, clubs and other non-profit concerns. 3Permitted uses are religious institutions, municipal and public utility structures, retail stores, undertaking or funeral services, theatres, restaurants, hotels, motels, recreation areas, amusement parks, and the like, 4Permitted uses are I or more dwellings with provisions for 4 or more families, reCoqnized professions assessory to the dwellings, and the like. 1. -U G).1 Tmmz Pe-x t SOAJ &'Cis Tow, DOM r h LIS6D By M061 entwort % C, Acr OIL 56ACM5 T JU "hns WaIE' bu 4 A Faci I ity: Repair and Maintenance Yard or Platform or Pipeline Installation Service Base A. Approximate Location of Site .:p st Cat 'i '0 Area in the northern part of Portsmouth, On the Piscataqua River, approxiinately .5 miles -f-r-o-m7le ran I Newington Town L ne. The site is located in the 0 p imary zone. B. Size Approximately 15-20 Acres C;- Current Status of Site 1. Existing Land Use Industrial - 40% Residential - 60% 2. Zoning Status Industrial 3. Ownership - The New Hampshire Public Service Corporation owns the site and the Boston and Maine Railroad has rights-of-way for rail lines. D. Land and Water Resources 1. Land Capability Classification - Urban - 100% 2. Adjacent to Surface Tidal Waters - Yes - Distance - The site borders on the Piscataqua River 3. Tidal Water Capability - Piscataqua River -2 4. Adjacent to Surface Fresh Water - No 5. Adjacent to Aquifer - No - Distance - The site is within 2.25 miles of a kame plain which underlies Pease Air Force Base, extending from Portsmouth into Newington. Another ice-contact deposit lies within 3.5 miles of the site, south of Banfield Road between Saqamore Creek and the Rye town line. - Potential Quantity and Quality of Water in Aquifers - The Portsmouth-Newinqton kame plain presently provides water for the Pease Air Force Base. The City of Portsmouth has only limited access to this source and the city's water department has yet to complete studies of the quality and potential of this supply. The ice-contact deposits between Sagamore Creek and the Rye town line have been subject to intensive gravel pit operation in the past, eliminating this area as a valuable aquifer. Probably only small supplies of groundwater, enough for domestic use or small-scale commercial use can be obtained from this source. E. Utilities and Services 1. Harbor Facilities Available There are 2 caissons off of the coastline of this site, which were used as docking facilities for 2 floating electrical power generating stations, known as the S.S. Resistance". The facility is not presently being used and could be used to dock a small 3-400 foot ship. Directly upstream of the site, in Portsmouth, are 2 tanker docks. One is used bv'Mohil oil in conjunction with the Mobil tank farm over the ffe-w-7-n-qton border.' It handles a"ship u to 680 feet long. Further upstream is a 640 foot T-head wharf used by C.H. Sprague and Son Co. Thisfacility handles ships up to.700 feet long. 2. Type of Facilities and Activities The 2 caissons off of the site are not presently being used as a docking facility. The facilities used by Mobil Oil and C.H. Sprague and Son Co. handle approximately a dozen and 2 dozen ships a year, respectively. Only one of the two facilities can be-used at a time due to the proximity of their locations. Both are tanker docks,.used exclusively to handle oil ana gas. 3. Potential for Expansion of Existing Harbor or New Harbor - The 2 caissons off of the site make a location where there may be some potential for dockinq facilities. - Downstream from the site the Piscatanua River narrows in relation to the channel and it would be impossibl-e for a ship to dock there and meet the requirements laid down by the Army Corps of Engineers. Further downstream is the Atlantic Heights residential section which, due to ledge elevations, is not suitable for marine use. - Existing facilities upstream from the site, presently used by Mobil and Sprague, may have potential for increased use and/or expansion. 4. Municipal Water Available - Yes - Distance to nearest hookup - Portsmouth Municipal Water System Lines are within .5 miles of the site, along qoslinq Road and in.Seacrest Village. - Amount of surplus water available - The Portsmouth Municipal Water system is presently operating at nearly full capacity. The sustainable yield ofsupply is 5.8 mqd, with current daily use averaginq 5.5 mgd. 5. Municipal Sewer Available - Yes Distance to nearest hookup - The nearest area serviced by the Portsmouth Municipal Sewer. system i's approximately .25 miles from the site. Type of sewage treatment - Primary, Facilities for secondary sewage treatment are presently in the planning stages. It is expected to take at least 10 years to 1) build facilities for the in% of the sewaqe that is beinq put directlv into the river, 2) complete the separation of sewage from wastewater and 3) change treatment from primary to secondarv. Excess capacity - The Portsmouth Municipal Sevier System is currentlv operatino at nearly full capacity. The present sewaqe treatment plant is desiqned to handle 1.5 mqd but actually handles @16ser to 2.5 mqd, the amount varying with weather conditions. This is a combined system which necessitates outfalls into the river when the system overloads. 6. Utilities Available - Yes A 345 KV transmission line and a 115 KV transmission line are approximately .5 miles from the site. F. Cost Factors 1. 1975 Municipal Tax Rate.- Portsmouth (eoualized) 35.64/l,nnn evaluation 2. lq75 Rockingham County Rate (equalized) 24.73/l,nnO evaluation G. Transportation 1, Highway Type of road which serves or is nearest to site The only access to the site is a liqht duty road which extends between Gosling, Road (secondary) and Pebble Way (a residential road in Atlantic Heights). This road services the S@raaue nil tanks and the coastline where the IIS'S. Resis@ance" was docked. riosling Road secondary) is approximately .75 Riles from the site. Distance to primary road - The Spauldinq Turnpike (primary) is approximately .75 miles southwest, once on Goslinq Road. Interstate q5 (primary) is approximately 1.5 miles e st via the Spaulding Turnpike. 2. Railroad Site Serviced by Rail Line Yes Distance to active rail line -.The Boston and Maine crosses the northern part of the site, alongside the coastline. 3. Port Distance to Existing or Potential Port Facilities The sitb'hat coastline with access to port facilities. 4. Oil or Gas Pipeline A 6 inch high pressure gas main which services the Schiller Power Plant is approximately .25 miles from the site, A 2 inch high pressure qas main is within .5 miles of the site. The Granite State Gas transmission line is. located 1 mile southwest of the site. H. Comments - The New Hampshire side of the Piscataoua River doesn't have any repair and maintenance yards. Boston and Portland are presently relifed on for these services. - This site represents the only unused section of land in Portsmouth, right on the Piscataqua River, with any potential for constructing fatilities to service OCS development and OrR-uction. - The soil found within this site is classified as made land, consistina of areas that have been excavated or filled in. Following the liqht-duty road from Gosling Road, past the Sprague oil tanks, the land slopes down to the coast where the "S.S. Resistance" was docked and 2 caissons now remain, - Three bridges require passage enroute to this site, ............. .......... .............. lPermitted uses are buildings and lots used for assembling, fabrication, manufacturers, packaqina or processing operations. AtItufloc. sAles CORP. f ant@CR dOCK FA61 WES CIO @L- (p SIZE Mu. sh Oftvj ENCJIAND ANK bu5t@-5t FOLCAli'fq ON P-06k 2-) on@on Od Ap PR-OX. Jr? SKL'PS/ k. CXND GlAf Od Ovep- 100 "ev 4) 6as@ OCEAN -cY- A 3) f"Kep, cbct@ rylow sh(p size 670 ft. Town Lan6ing, P. F, A Ose BNMIMAD to Vorf Aotho rif V 51'Mplex Win own factIlly I 0-- -Ca P- iok Mox. ship st zip a POX P, 50 2 ble'@4 wi,til 33 ... ...... '"F3 u PUblIG 7 1?" G 56 Mobil \< j, 01' -3 2' 0 rt0l'- /K IL11on 30 Far 54 Int P 70 U&M zo 6 Commercial faci Piscataqua River In Ne !Sea qua Nlk. Aft. 47/ 'Co Do' riqNydepl D()CX C-0-- C "r Y BUY ATLANTIC SALES CoP-POIZAT(oJ Gen'eral Sullivan'\ Bridge olinq 2 CA 01 wir T olinPLL P 1. [email protected] TANK61Z 900@- ,'Newihgt- -V6K) 6UGLAND Pits on -MION OIL ---It,a,tion TO A/ LA 'A &Ut-F Of I- 6A 11C D 01A., @:*,.@.,.. @-C;k ri e a I . . . . . . . . . . 7,. 54 Light 0 p i I iX. Light 043 ingto ta isca qua 2 mq T, N@ Possible site for Repair and Maintenance Yard/Platform or Pipeline Installation Service Size: Approximately 10 acres Existing Land Use: Woodland - 40% Abandoned Land - 40% Residential 20% Zoning Status: Waterfront Industrial.. *This section of the report Industrial by OCP before more detaile the'following facility-spe Land Use Capability: Excellent 50% could be completed. Fair 50% 0 .7n-F 5. 77 'CO DoVei.'P*"" \'I//. t C17'Y TANI<6R DOCK Gen*i!ral Sullivan\, M: ATLOiNTIC SAMs COKPourioN Btidge P l' 6 '>wline uree Piling, Aerp Tow LANPiNC, Ne I wihgton L plis Z@' tation 110 TJONKM PCCk @t 0 R6 lin C'. or r VNIO" YI/ x/. 6vLF -4,1 V 0 qr NTheat 4@. S6A ;00 54 IN Light 0 L 4,04, Light it ingto 0 47 iscat, aqua T T 01 Possible site for Permanent Service Base Size: approximately,75 acres Existing-Land Use:- Abandoned Land - 55% Woodland - 40% Residential - 5% Zoning Status: Waterfront Industrial Industrial Land Use Capability: Excellent 15% Fair 50% Poor 35% 0 T . . . . . . . . . . . . N7 1CO bo e rPt Ir CO -C Y v, JANKEP, POCK Gen'ieral Sullivan', Bridge ATLAVVC SALfs CORPOPAilohi/ C Olinq Aoline r - reb, IA Piling, :17 -3 ANA6 vel *'I iNewihgton P `tation Thm<eR DOC" MP DY 'H i- R 6H i A w@ 8 6 A Far (IV healVr A 54 2Y Light 0 pilil@g@- U*goht 00 0 a ngto 0 iscataijua2 01 Possible site for Pipecoating Yard Size: approximately 120 acres Existing Land Use: Abandoned Land - 70% Woodland - 20c/-O/ Industrial/Commercial - 5% Residential - 5% Zoning Status: Waterfront Industrial Industrial Land Use Capability: Excellent - 40% Fair - 40% 0 Poor 12 - qg 'CO Dover Pt C Jr Y TANKa. Pow- Gen'eral Sullivan\, B(idge :r,.,rXi k1l 0 rt. so n 6 tq(rh MAI Acre 2.3 Tojw, V60C ;Ne ihgt@n usep By - Ivew C-N UNION OIL- GULF 0,: tation _@j R o I MS Far P Avt iY -0 ".1. Light 0 PilinX Light 0). ingto, N, 0 iscataqua 2 47 e. T - N. 00 Possible site for Marine Terminal Size: approximately 100 acres Existing Land Use: Abandoned Land - 60% Woodland - 25% Residential - 10% Commercial/Ind.- .5% Zoning Status: Industrial Land Use Capability: Excellent - 20% Fair - 50% Poor - 30% 0 7! bc@e Fit"-, C1 _rY BDY General Sullivan\, 7rA N KE R - OOC r, V56 0 Bridge NeW 610L 4ND TAN 1 4-- S-01ineI umopj OIL P n A 6uLf Ott, @ili Q'.'... _&A 'Newihgt3n- a v e Pos tation. & Ro Iril (th 0 Far '$ % 0 - 61@n' N@ 7 Pea qr Lighl i in 1-0 N'Wingto SNMIJa 0 26 e@'. s o We- ;me 0. E Possible site for Repair and Maintenance Yard/Platform or Pipeline Installation Service Size: approximately 10 acres Existing Land Use: Woodland - 50% Industrial 50% Zoning Status: Waterfront.- Industrial Land Use Capability: Excellent - 80 Existing Urban - 20% 0 IARY'@ ZOM A L R@,,qi U M-, C I PA L D ATA TERTIARY ZOME Sources of General Municipal Data for Communities'-in the Tertiary Coastal Zone: 1) Municipal Tax Rate (Equalized) - Based on 1976 municipal tax rates and'1976 assessment ratios obtained from the New Hampshire Department of Revenue 2) County Tax Rate (Equalized) - Based on 1975 county tax rates and 1974 assessment ratios obtained from the New Hampshire Department of Revenue. (Note: more recent information, including current county assessment ratios, isbeing prepared by the Property Appraisal Division of the Department of Revenue.) 3) Municipal,Water Available town officials 4) Municipal Sewer Available - town officials 5) Number of known aquifers - Army Corps of Engineers report "Southeast New Hampshire Water SUpply Study, Estimated Demands'and Resource Availability", page 43 map plate 7 (July, 1976). For thi towns of Kensington and South Hampton - Locations of aquifers obtained from Edward Bradley's report "Geology and Groundwater Resources.of Southeastern New Hampshire" Water Supply Paper 1695, plate 1 (1964). Estimated Volume of groundwater obtained from Army Corps of Engineers report, pages 41-42. For the town of New Durham -.Location of aquifers obtained from the Strafford Regional Planning Commission's "Groundwater Potential Map", Northern Strafford Region Environmental Planning Study (1975). Townis estimated groundwater potential Army Corps of Engineers report, pages 41-42 TOWN: BARRINGTON General Municipal Data 1), Municipal Tax Rate (Equalized) $21.50/1000 evaluation 2) County Tax Rate*(Equalized) - $25.82/1000 evaluation 3) Municipal Water Available - No 4) Municipal Sewer Available - No 5) Number of'Known Aquifers 8 *Barringtonts estimated groundwater potential: 1.80 mgd TOWN- BRENTWOOD Gener@@n@ici al Data 1) Municipal Tax Rate (Equalized) $25.30/1000 evaluation 2) County Tax Rate (Equalized) - $24.73/1000 evaluation I) Municipal Water Availablec,- No 4) Municipal Sewer Available No 5) Number of Known Aquifers 2 *Brentwood's estimated groundwater potential: 1.31 mgd TOWN: BROOKFIELD General Municipal Data 1) Municipal Tax Rate (Equalized) $18.50/1000 evaluation 2) County Tax Rate (Equalized) - $11.10/1000 evaluation 3) Municipal Water Available No Municipal Sewer Available No 5) Number of Known Aquifers 5 *Brookfield's estimated groundwater potential:,- .78 mgd TOWN; C.ANDIA General Municipal Data, 1) Municipal Tax Rate (Equalized) $25.50/1000 evaluation 2) County Tax Rate (Equalized) - $24.73/1000 evaluation 3) Municipal Water Available No 4) Municipal Sewer Available No Number of Known Aou'ifers - 0 *Candia@:s estimated groundwater potential: 0 TOWN: CHESTER General Municipal Data 1) Municipal Tax Rate (Equalized) $23.60/1000 evaluation 2) County Tax Rate (Equalized) $24.73/1000 evaluation 3) Municipal Water Available No 4) Municipal Sewer Available No 5) Number of Known Aquifers - 2 *Chester's estimated groundwater potential: .20 mgd TOWN: DANVILLE General Municipal Data 1) Municipal Tax Rate (Equalized) $28.10/1000 evaluation 2) County Tax Rate (Equalized) - .$24.73/1000 evaluation 3) Municipal Water Available No 4) Municipal Sewer Available No 5) Number of Known Aquifers - 3 (2 plus a cluster) *Danville's estimated,groundwater potential: .27 mgd TOWN: DEERFIELD al Municipal Dati_ Gener al Data 1) Municipal Tax Rate (Equalized) $16.30/1000 evaluation 2) County Tax Rate (Equalized) $24.73/1000 evaluation 3) Municipal Water Available - No 4) Municipal Sewer Available - No 5) Number of Known Aquifers - 2 *Deerfield's estimated groundwater potential: .18 mgd TOWN: EAST KINGSTON General Municipal Data 1) Municipal Tax Rate (Equalized) $26.20/1000 evaluation 2) County Tax Rate (Equalized) $24.73/1000 evaluation 3) Municipal Water Avallable@ No 4) Municipal Sewer Available No .5) Number of Known Aquifers 1 *East Kingston's estimated groundwater potential:- .53 mgd TOWN: EPPING @General Municipal Data 1) Municipal Tax Rate (Equalized) $23.30/1000 evaluation 2) County Tax Rate (Equalized) - $24.73/1000 evaluation 3) Municipal Water Available - Yes - sustainable yield of supply: NA The town wants to hire an engineer to determine the MaAMUM yield of the water supply. Some excess capacity suspected) - current daily use: 115,000 gd 4) Municipal Sewer Availabl e - Yes - excess capacity: 25,000 gd - type of treatment: primary 5) Number of Known Aquifers - 7 *Epping s estimated groundwater potential: .94 mgd TOWN: FARMINGTON General Munidipal Data $20.10/1000 evaluatio RZ 61 1) Municipal Tax Rate (Equalized) n 2) County Tax Rate (Equalized) $25.82/1000 evaluation 3) Municipal Water Available Yes - sustainable yield of supply: 1.3 mgd - current dally.use: 590,000 gd VIU33 NOUVW1800 4) Municipal Sewer Available - Yes 3NOZ MUM - excess capacity: 240,000 gd - type of treatment: secondary 5) Number of Known Aquifers - I *Farmington's estimated groundwater potential: 4.25 mgd TOWN: FREMONT General Municipal Data 1) Municipal Tax Rate (Equalized) $24.90/1000 evaluation 2) County Tax Rate (Equalized) - $24.73/1000 evaluation 3) Municipal Water Available - No 4) Municipal Sewer Available - No 5) Number of Known Aquifers 6 *Fremont!s estimated groundwater potential: 1.08 mgd TOWN; KENSINGTQN General Munidipal Data 1) Municipal Tax Rate (Equalized) $22.90/1000 evaluation 2) County Tax Rate (Equalized) - $24.73/1000 evaluation 3) Municipal Water Available - No 4) Municipal Sewer Available - No 5) Number of Known Aquifers - 1 Nensington's..estimated groundwater potential: 2.02 mgd TOWN: KINGSTON General Municipal Data 1) Municipal Tax Rate (Equalized) $29.00/10,00 evaluation 2) County Tax Rate (Equalized) $24.73/1000 evaluation 3) Municipal Water Available No 4) Municipal Sewer Available No 5) Number of Known Aquifers 6 *Kingston's estimated groundwater-pptential 1.34 mgd TOWN: LEE General Municipal Data 1) Municipal Tax Rate (Equalized) $29.20/1000 evaluation 2) County Tax Rate (Equalized) $25.82/1000 evaluation 3) Municipal Water Available - No 4) Municipal Sewer Available No 5) Number of Known Aquifers 10 *Lee's estimated groundwater potential 3.51 mgd TOWN: MIDDLETON 'General Municipal bata 1) Municipal Tax Rate (Equalized) $32.70/1000 evaluation 2) County Tax Rate (Equalized) - $25.82/1000 evaluation 3) Murilcipal Water Available - No 4) Municipal Sewer Available - No 5) Number of Known Aquifers - 0 *Midd,leton,ls estimated groundwater potential0 TOWN: MILTON General _EEJ@cial Data 1) Municipal Tax Rate (Equalized) $23.10/1000 evaluation 2) County Tax Rate (Equalized) $25.82/1000 evaluation 3) Municipal Water Availablel- Yes - sustainable yield of supply - 4 mgd - current daily use - 120,000 gd .4) Municipal Sewer Available - No 5) Number of Known Aquifers - 3 *Milton's estimated groundwater potential .84 mgd TOWN: NEW DURHAM General Munici2al Data Municipal Tax Rate (Equalized) $16.30/1000 evaluation 2) County Tax Rate (Equalized) - $25.82/1000 evaluation 3) Municipal Water Available No 4) Municipal Sewer Available No 5) Number of Known Aquifers - 11 *New Durham's estimated groundwat& potential NA* *NA=Not Available TOWN; NEWTON General Municipal Data 1) Municipal Tax Rate (Equalized) $39.20/1000 evaluation 2) County Tax Rate (Equalized) $24.73/1000 evaluation 3) Municipal Water Available No 4) Municipal,Sewer Available No @5) Number of Known Aquifers - 3 *NewtonIs estimated groundwater potential 1.19 mgd -Ii. Llk Doi 'IV"VWJ TOWN: NORTHWOOD General Municipal Data 1) Municipal Tax Rate (Equalized) $15.70/1000 evaluation 2) County Tax Rate (Equalized) $24.73/1000 evaluation 3) Municipal Water Available- No 4) Municipal-Sewer Available - -No 5) Number of Known Aquifers - I *Northwood's estimated groundwater potential less than 100,000 gpd TOWN: NOTTINGHAM General Municipal Data 1) Municipal Tax Rate (Equalized) $13.00/1000 evaluation. 2) County Tax Rate (Equalized) - $24.73/1000 evaluation 3) Municipal Water Available - No 4) Municipal Sewer Available - No 5) Number of Known Aquifers - 3 *Nottingham's estimated groundwater potential 2.86 mgd TOWN: PLAISTOW General Municipal Data 1) Municipal Tax Rate (Equalized) $31.40/1000 evaluation 2) County Tax Rate (Equalized) - $24.73/1000 evaluation 3) Municipal Water Available - No 4) Municipal Sewer Available No 5) Number of Known Aquifers 5 *PI,aIstow's estimated groundwater potential 1.64 mgd 49 TOWN: 'MYMQNP General Municipal Data 1) Municipal Tax Rate (Equalized) $36.80/1000 evaluation 2) County Tax Rate (Equalized) - $24.73/1000 evaluation 3) Municipal Water Available - Yes - sustainable yield of supply - 400,000 gd - current daily use - 117,000 gd 4) Municipal Sewer Available - No 5) Number of Known Aquifers - I *Raymond's estimated groundwater potential -less than 100,000 gpd TOWN: ROCHESTER General Municipal Data 1) Municipal Tax Rate (Equalized) $25.40/1000 evaluation 8161 2) County Tax Rate (Equalized) - $25.82/1000 evaluation 3) Municipal Water Available Yes - sustainable yield of supply - 8-10 mgd - current daily use - 2 mgd 39OZ IVISM 4) Municipal Sewer Available - Yes excess capacity - No type of treatment - no treatment 5) Number of Known Aquifers 6 *Rochesterls estimated groundwater potential 3.94 mgd TOWN: SANDOWN General MunicipLI Data 1) Municipal Tax Rate (Equalized) $22.50/1000 evaluation 2) County Tax Rate (Equalized) $24.73/1000 evaluation 3) Municipal Water Available - No 4) Municipal Sewer Available - No 5) Number of Known Aquifers - 0 *Sandown's estimated groundwater potential 0 TOWN: SOMERSWORTH General Municipal Data 1) Municipal Tax Rate (Equalized) $34.90/1000 evaluation 2) County Tax Rate (Equalized) - $25.82/1000 evaluation 3) Municipal Water Available - Yes - sustainable yield of supply - 2 mgd - current daily use - 1.1 m9d/winter 1.2 mgd/summer 4) Municipal Sevier Available - Yes excess capacity - 1.3 mgd (the sewage treatment plant is designed to handle 2.4 mgd and presently treats 1.1 mgd. However, there are some areas of the sewer pipeline system that are overloaded.) type of treatment - secondary 5) Number of Known Aquifers - 2 *Somersworth's estimated groundwaterlpotevitial 6.18 mgd TOWN: STRAFFORD General Municipal Data 1) Municipal Tax Rate (Equalized) $13.10/1000 evaluation 2) County Tax Rate (Equalized) - $25.82/1000 evaluation 3) Municipal Water Available No 4) Municipal Sewer Available No 5) -Number of Known Aquifers 2 *Strafford's estimated groundwater potential .61 mgd TOWN: SOUTH HAMPTON General Municipal Data 1) Municipal Tax Rate (Equalized) $18.20/1000 evaluation 2) County 'Tax Rate (Equalized) - $24.73/1000 evaluation 3) Municipal Water Available No 4) Municipal Sewer-Available No 5) Number of Known Aquifers I *South Hampton's estimated,groundwater potential .26 mgd TOWN: WAKEFIELD General Municipal Data 1) Municipal Tax Rate (Equalized) $9.00/1000 evaluation 2) County Tax Rate (Equalized) $11.10/1000 evaluation 3) Municipal Water Available - Yes - sustainable yield of supply - 216,000 gd - current daily use 160,000 gd 4) Municipal,Sewer Available No 5) Number of Known Aquifers - 7 LAI *Wakefield's estimated groundwater potential 2.33 mgd PA R- C E L Df,-ff A TERTIARY ZOME Sources of Parcel Data for Communities in the Tertiary Coastal Zone: A. Site interpreted from the New Hampshire Office of Comprehensive Planning Land Capability Map B. Size delineated area measured with a planimeter C. Current Status 1) Existing Land Use - New Hampshire Office of Comprehensive Planning Existing Land Use Map (Using visual estimates) 2) Zoning Status - New Hampshire Office of Comprehensive Planning Local Zoning Ordinance Map (Using visual estimates) D. Land and Water Resources 1) Land Capability - New Hampshire Office of Comprehensive Planning Land Capability Map (using visual estimates) 2) Adjacent to surface fresh water, distance - Soil surveys of Strafford and Rockingham Counties for the towns of Wakefield and,Brookfield - N.H. Water Supply and Pollution Control Commission report, "Piscataqua River and Coastal N.H. Basins, Water Quality Management Plan" (January, 1975) 3) Adjacent to Aquifer, distance - Army Corps of Engineers report "Southeast New Hampshire Water Supply study, Estimated Demands and Resource Availability" page 43 map plate 7 (1976) - for the towns of Kensington and South Hampton - Edward Bradley's report "Geology and Groundwater Resources of Southeastern New Hampshire" Water Supply Paper 1695, plate 1 (1964) - for the town of New Durham - Strafford Regional Planning Commission's "Groundwater Potential Map", Northern Strafford Region Environmental Planning Study (1975) E. Utilities and Services 1) 'Distance to nearest major water hookup,.,town(s) it serves - N.H. Office of Comprehensive Planning,Water Supply Service Areas, obtained from the N.H. Water Supply.. and Pollution, Control Commission 2) Distance to nearest sewer hookup, town(s) it serves - N.H. Office of Comprehensive Planning.' Sewer Service Areas, obtained from the N.H. Water Supply and Pollution Control Commission for the town of Epping - Southeastern New Hampshire Regional Planning Commission's report "Wastewater Disposal Report 7" (August, 1972) 3) Utilities available; distance to nearest major transmission line and type of line N.H. Office of Comprehensive Planning Base Map Supplementary Information Provided by - Public Service Company of New Hampshire, Lakes Region Planning Commission, and Southeastern New Hampshire Regional Planning Commission's report "Existing Land Use - Report 3" 4) Gas,-.Pipeline;.distance to nearest gas main Northern Utilities Inc., Allied Gas Division F. Transportation 1) Highway; type of road which services site and distance to primary road highway maps 2) Railroad; distance to active rail line N.H. Office of Comprehensive Planning Base Map RAILROADS BOUNDARIES EDUCATIONAL AND CORRECTIONAL RAILROAD (ANY NUMBER OF TRACKS USED BY STATE INSTITUTIONS A SINGLE OPERATING COMPANY) COUNTY RAILROADS IN JUXTAPOSITION (TWO OR MORE - - - - - - TOWN SCHOOL HOUSE TRACKS OF SEPARATELY OPERATED COM- PUBLIC LIBRARY PANIES ON ADJACENT RIGHTS-OF-WAY) NATIONAL OR STATE FOREST OR RESERVATION TOWN, GRANGE, OR 0THER HALL RAILROAD PRIVATELY OWNED (NARROW GAUGE) (ADD LETTERS T, G, OR 0 TO DESIGNATE KIND) RAILROAD (SERVICE ABANDONED) CONSERVATION AND RECREATION CORRECTIONAL INSTITUTION RAILROAD STATION OBSERVATION OR LOOKOUT TOWER RAILROAD CROSSINGS PICNIC GROUND PUBLIC SERVICE FACILITIES GRADE CROSSING PLAYGROUND, BALLFIELD, ETC. POST OFFICE RAILROAD ABOVE BATHING BEACH OR SWIMMING POOL U.S. BORDER PORT OF ENTRY TOURIST CAMP OR MOTEL WATER SUPPLY STAND PIPE RAILROAD BELOW DRIVE-IN THEATRE POWER STATION GUARD OR RANGER STATION (NOT PERMANENTLY RADIO' STATION OCCUPIED) HIGHWAY GARAGE AIRPORTS FISH HATCHERY FIRE STATION MILITARY FIELD GOLF COURSE DUMP FIELD FOR COMMERCIAL OR GENERAL ATHLETIC FIELD MISCELLANEOUS MAP FEATURES PUBLIC USE FAIR GROUND, RACE COURSE, SPEEDWAY AIRWAY LIGHT BEACON CAMP OR LODGE POINTS BETWEEN WHICH DISTANCES ARE MEASURED SEAPLANE BASE, CIVIL FARM UNITS, DWELLINGS, ETC. OVERFLOW LAND NAVIGATION ROAD SYSTEM DESIGN LIGHT HOUSE FARM UNIT TRUNK LINE HIGHWAYS DWELLING OTHER THAN FARM ALL OTHER PUBLIC HIGHWAYS GROUPS OF DWELLINGS CLOSELY SPACED DRAINAGE NARROW STREAM DWELLING AND POST OFFICE FEDERAL AID PRIMARY SYSTEM WIDE STREAM FEDERAL AID SECONDARY SYSTEM DWELLING AND STORE DAM WITHOUT ROAD DWELLING AND FILLING STATION FEDERAL AID URBAN SYSTEM SEASONAL DWELLING UNITED STATES HIGHWAY SYSTEM STRUCTURES SEASONAL DWELLINGS CLOSELY SPACED HOTEL,INN STATE HIGHWAY NUMBERED SYSTEM HIGHWAY BRIDGE (ANY TYPE OVER 20' IN LENGTH) CHURCH END OF FEDERAL AID DESIGNATED ROUTE HIGHWAY BRIDGE (ANY TYPE 20' OR LESS, HOSPITAL BUT MORE THAN 10' IN LENGTH) CEMETERY L SMALL BRIDGES CLOSELY SPACED WATER STORAGE FOP FIRE PROTECTION TRAFFIC CIRCLE CLOVER LEAF DRAWBRIDGE GROUP OF MIXED CULTURAL FEATURES ROADWAY FEATURES NATURAL FEATURES CLOSELY SPACED DIVIDED HIGHWAY WITH FULL CONTROL OF ACCESS PROMINENT ELEVATION INDUSTRIAL - - - - - - - - DIVIDED HIGHWAY WITH PARTIAL CONTROL OF ACCESS CITY AND VILLAGE CENTERS STORE OR SMALL BUSINESS PAVED ROAD STATE CAPITAL BUSINESS AND POST OFFICE BITUMINOUS SURFACED ROAD GRAVEL SURFACED ROAD COUNTY SEAT BUSINESS AND FILLING STATION FACTORY OR INDUSTRIAL PLANT GRADED AND DRAINED ROAD OTHER CITIES AND VILLAGES SAW MILL (STATIONARY) MINE UNIMPROVED ROAD ROAD DELIMITED URBAN AREA OIL STORAGE TANKS ........... PRIMITIVE ROAD FILLING STATION SUGAR HOUSE GRAVEL PIT QUARRY *Base Map Key F 7 L *Town; RI VER q 4) 320 3 It C, -f-J '26 SIP Mt. Miser y S.nnyside Nippo yo- -6 Pond Sarri n' I Pond OW B Ba- East Hill IS--- U@ A it It 00 T 0 L7rook Roun POPULATI 1970 Ponds N, Ba- 7 Seapt Hit, a ba-Y 360 7- Un$(, Sumfaggin B2-1Q, n Hill 1@7 4 ell Mendum A,` -12 Ba NNN"\ 41 '% FAP 4 0 TOWN; BARRINGTON A. Site BA-1 B. Size Approximately 410 acres C. Current Status 1) Existing Land Use: Forested Lands - 80% 2) Zoning Status: Single Zoning Marshlands - 10% Water Areas " 5% Open/Uncultivated - 5% D. Land and Water Resources 1) Land Capability: Excellent - 80% 2) Adjacent to surface fresh water Yes Good - 15% Distance on site (Long Pond, Isinglass River, Fair - 5% Mohawk River) 3) Adjacent to Aquifer No Distance - .25 miles E. Utilities and Services 1) Distance to nearest major water hookup 4.0 miles What town(s) does this hookup serve - Rochester 2) Di'stance to nearest sewer hookup - 4.75 miles What town(s) does this hookup serve - Rochester 3) Utilities Available; Distance to nearest major transmission line .5 miles Type of transmission line - 345 KV 4) Gas Pipeline; Distance to nearest gas main 5.0 miles F. Transportation 1) Highway; Typeof road which services or is nearest to site secondary (State Highway 126) Distance to primary road - 4.0 miles (U.S. 4) 2) Railroad; Site serviced by rail - No Distance to active rail line 5.4 miles TOWN; 5ARRINGTON A. Site BA-2 .B. Size - Approximately 360 acres C. Current Status 1) Existing Land Use.: Forested Lands - 80% 2) Zoning Status: Single Zoning Extractive, Quarry, Sand-pit, - 10% Open/Uncultivated - 10% D. Land and Water Resources 1) Land Capability: Excellent - 95% 2) Adjacent to surface fresh water Yes Poor - 5% Distance on site (Isinglass River) 3) Adjacent to Aquifer - Yes Distance on site Utili4les and..,"'erv ices 1) Distance to nearest major water hookup 3.5 miles What town(s) does this hookup serve - Rochester Distance to nearest sewer hookup - 3.5 miles What town(s) does this hookup serve - Rochester 3) Utilities Available; Distance to nearest major transmission line 1.7 miles Type of transmission line - 115 KV 4) Gas Ploeline; Distance to nearest gas main - 3.75 miles F. Transportation 1) Highwayi Type of road which services or Is nearest to site secondary (U.S.* 262) Distance to primary road - 2.5 miles (State Highway 125) 2) Railroad; Site serviced by rail - No Distance to active rail line 4.4 miles TOWN; BARRINPTQN A. Site BA-3 B. Size Approximately 380 acres C. Current Status 1) Existing Land Use: Forested Lands - 95% 2) Zoning Status: Single Zoning Marshlands - 5% D.. Land and Water Resources 1) Land Capability: Excellent - 70% 2) Adjacent to surface fresh water Yes Good - 25% Distance adjacent (Mallego Brook) Poor - 5% 3) Adjacent to Aquifer - Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup 3.5 miles What town(s) does this hookup serve - Rochester 2) -Distance to nearest sewer hookup - 3.25 miles What town(s) does this hookup serve - Rochester 3) Utilities Available; Distance to nearest major transmission line .1, mile Type of transmlssion line - 115 KV 4) Gas Pipeline; Distance to nearest gas main 3.75 miles F. Transportation 1) Highway.; Type of road which services or is nearest to site secondary (State Highway 9) Distance to primary road - 1.2 miles (State Highway 125) 2) Railroad; Site serviced by rail - No Distance-to active rail line 4.3 miles TOWN: BARRING',TQN A. Site BA-4 B. Size Approximately 490'acres C. Current Status 1) Existing Land Use: Forested Lands - 85% 2) Zoning Status: Single Zoning Open/Uncult-fivated - 10% Residential - 5% D. Land and Water Resources 1) Land Capability: Excellent - 15% 2) Adjacent to surface fresh water Yes Good - 70% Distance on site (Green Hill Brook) Fair - 5% Poor - 10% 3) Adjacent to Aquifer No Distance - .25 miles E. Utilities and Services 1) Distance to nearest major water hookup 1.75 miles What town(s) does this hookup serve - Rochester 2) Distance to nearest sewer hookup - 1.5 miles What'town(s) does this hookup serve - Rochester 3) Utilities Available; Distance to nearest major transmission line .2 miles Type of transmission line - 115 KV 4) Gas Pipeline; Distance to nearest gas main 2.5 miles F. Transportation 1) Hiqhway; Type of road which services or is nearest to site primary (State Highway 125) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - No Distance to active rail line 2.7 miles 01 TOWN: BARRTMC1TQN A. Site - BA-5 B. Size - Approximately 490 acres C. Current Status l)' Existing Land Use: Forested Lands - 95% 2) Zoning Status: Single Zoning Open/Uncultivated - 5% D. Land and Water Resources 1) Land Capability: Excellent - 65% 2). Adjacent to surface fresh water - Yes Good - 35% Distance on site (Calef Brook) 3) Adjacent to Aquifer - Yes Distance - on s-ite E Utilities and Services 1) Distance to nearest major water hookup 2.0 miles What town(s) does this hookup serve - Dover 2) Distance to nearest sewer hookup - 2.5 miles What town(s) does this hookup serve - Rochester 3) Utilities Ava-ilable; Distance to nearest major transmission line .9 miles Type of transmission line - 115 KV 4) Gas Pipeline; Distance to nearest gas main 3.5 miles F. Transportation 1) Highway; Type of road which services or is nearest to site primary (State Highway 125) secondary (State Highway 9) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - No Distance to active rail line 3.7 miles TOWN: BARRINGTON A. Site BA-6 B. Size - Approximately 540 acres C. Current Status 1) Existing Land Use: Forested Lands - 85% 2) Zoning Status: Single Zoning Open/Uncultivated - 5% Extractive, Quarry, Sandpit - 5% Water Area - 5% D. Land and Wdter Resources 1) Land Capability: Excellent. - 85% 2) Adjacent to surface fresh water Yes Poor 15% Distance on site (Mallego Brook, Drew Brook, Bellamy River, Winkley Pond) 3) Adjacent to Aquifer Yes Distance - adjacent utilities and Services 1) Distance to nearest major water hookup 2.75 miles What town(s) does this hookup serve - Dover 2) Distance to nearest sewer hookup 3.25 miles What town(s) does this hookup serve - Rochester 3) Utilities Available; Distance to nearest major transmission line .5 miles Type of transmission line - 115 KV 4) Gas Pipeline; Distance to nearest gas main 4.25 miles F. Transportation 1) Highway; Type of road which services oe is nearest to site primary (State Highway 125) secondary (State Highway 9) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - No Distance to active rail line 3.7 miles TOWN: BARRINGTON A. Site BA-7 B. Size Approximately 2330 acres C. Current Status 1) Existing Land Use: Forested Lands - 85% 2) Zoning Status: Single Zoning Residential - 5% Open/Uncultivated - 5% Marshlands - 5% D. Land and Water Resources 1) Land Capability: Excellent 65% 2) Adjacent to surface fresh water Yes Good 25% Distance on site (Bellamy River, Mallego Brook) Fair 5% adjacent (Union Lbke) Poor 5% 3) Adjacent to Aquifer Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup 3.0 miles What town(s) doestthis hookup serve Dover 2) Distance to nearest sewer hookup - 3.25 miles What town(s) does this hookup serve,-- Rochester 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line - 115 KV 4) Gas Pipeline; Distance to nearest gas main - 4.25 miles F. Transportation 1) Highway; Type of road which services or is nearest to site primary (State Highway 125) secondary (State Highway 9) Distance to primary road - adjacent 2) Railroad; Site serviced by rail -, No Distance to active rail line 3.8 miles TQMN. DARRINGTON A. Site BA-8 B. Size Approximately 1820 acres C. Current Status 1). Existing Land Use:. Forested Lands - 80% 2) Zoning Status: Single Zoning Marshlands - 10% Residential - 5%. Water Area - 5%. D. Land and Water Resources 1) Land Capability.-@ Excellent - 65% 2) Adjacent to surface fresh water Yes Good - 20% Distance on site (Round Ponds Poor - 15% adjacent (Union Lake@ 3) Adjacent to Aquifer - No Distance 1.0 mile. E4 Utilities and Services 1) Distance to nearest major water hookup -4.75 miles What town(s) does this hookup serve - Rochester 2) Distance to nearest sewer hookup - 4.5 miles What town(s) does this hookup serve - Rochester 3) Utilities Available; Distance to nearest major transmission line 1.8 miles Type of transmission line - 115 KV. 4) Gas Pipeline; Distance to nearest gas main 5.25 miles F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 9) Distance to primary road - 1.75 miles (U.S. 4) 2) Railroad; Site serviced by rail - No Distance to active rail line 5.6 miles TOWN: BARRINGTON A. Site BA-9 B. Size Approximately 260 acres C. Current Status Existing Land Use: Forested Lands - 90% 2) Zoning Status: Single Zoning Residential - 5% Water Area 5% D. Land and Water Resources 1) Land Capability: Excellent 50% 2) Adjacent to surface fresh water Yes -Good 45% Distance on site (Davis Pond) Poor -5% adjacent (Stonehouse Pond, North River Pond) 3) Adjacent to Aquifer No Distance - 3.75 miles E. Utilities and Services 1) Distance to nearest major water hookup 7.5 miles What town(s) does this hookup serve - Rochester Distance to nearest sewer hookup - 7.25 miles What town(s) does this hookup serve - Rochester 3) Utilities Available; Distance to nearest major transmission line 1.0 mile Type of transmission line - 345 KV 4) Gas Pipeline; Distance to nearest gas main 7.75 miles F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 9) Distance to primary road - .7 miles (U.S. 4) 2) Railroad; Site serviced by rail - No Distance to active rail line 8.2 miles OWN: BARRINGTON T A. Site - BA-10 B. Size - Approximately 1740 acres C. Current Status 1) Existing L and Use: Forested Lands - 85% 2) Zoning Status: Single Zoning Marshlands - 5% Open/Uncultivated - 5% Water Area - 5% D. Land and Water Resources 1) Land Capability: Excellent 45% 2) Adjacent to surface fresh water Yes Good 45% Distance on site (Round Pond) Fair 5% adjacent (Mendums Pond) Poor 5% 3) Adjacent to Aquifer - No Distance - 1.5 miles@ E. Utilities and Services Distance to nearest major water hookup 6.75 miles What town(s) does this hookup serve - Rochester 2) Distance to nearest sewer hookup - 6.25 miles What town(s) does this hookup serve - Durham 3), Ut-ilities Available; Distance to nearest major transmission line .9 miles Type of transmission line - 115 KV 4) Gas Pipeline;,Distance to nearest gas main 7.28 miles F. Trans2ortation 1) Highway; Type of road which services or is nearest to site primary (U.S. 4) Distance to primary road - .3 miles (U.S. 4) 2) Railroad; Site serviced by rail - No Distance to active rail line 7.'0 miles TOWN: BARRINGTON ft. Site - BA-11 B. Size - Approximately 490 acres C. Current Status 1) Existing Land Use: Forested Lands - 95% 2) Zoning Status: Single Zoning Residential - 5% D. Land and Water Resources 1) Land Capability: Excellent - 60% 2) Adjacent to surface fresh water Yes Good - 25% Distance - adjacent (Mendums Pond) Fair 15% 3) Adjacent to Aquifer - No' Distance .75 miles E. Utilities and Services 1) Distance to nearest major water hookup 5.5 miles What town(s) does this hookup serve -,Durham 2) Distance to nearest sewer hookup - 5.0 miles What town(s) does this hookup serve - Durham 3) Utilities Available; Distance to nearest major transmission li,ne adjacent Type of transmission line - 115 KV 4) Gas Pipeline; Distance to nearest gas main - 7.25 miles F._ Transportation 1) Highway; Type of road which services or is nearest to site primary (U.S. 4) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - No Distance to active rail line 5.7 miles TOWN: BARRINGTQN A. Site BA-12 B. Size Approximately 2790 acres C. Current Status, 1) Existing Land Use: Forested Lands - 90% 2) Zoning Status: Single Zoning Residential - 5% Marshlands - 5Z D. Land and Water Resources 1) Lan'd Capability: Excellent - 70% 2) Adjacent to surface fresh water Yes Good - 15% Distance on site (Oyster River, Caldwell Brook) Fair - 5% adjacent (Un-ion Lake) Poor - 10% 3) Adjacent to Aquifer Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup 3.75 miles What town(s) does this hookup serve - Dover or Durham 2) Distance to nearest sewer hookup - 3.0 miles What town(s) does this hookup serve - Durham 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line - 345 KV, 115 KV 4) Gas Pipeline; Distance to nearest gas main 5.25 miles F. Transportati on 1) Highway; Type of road which services or is nearest to site primary (U.S. 4, State'Highway 125.@ Distance to primary road - adjacent 2) Railroad; Site serviced by rail - No Distance to active rail line 3.8 miles TOWN; BARRINGTO A. Site BA-13 B. Size Approximately 230 acres C. Current Status 1) Existing Land Use: Forested Lands 100% 2) Zoning Status: Single Zoning D. Land and Water Resources 1) Land Capabi.11ty: Excellent - 40% 2) Adjacent to surface fresh water Yes Good - 40% -Distance on site (Isinglass River) Fair - 20% 3) Adjacent to Aquifer - No Distance - 1.0 mile E. Utilities and Services 1) Distance to nearest major water hookup 4..75 miles What town(s) does this hookup serve - Rochester 2) Distance to nearest sewer hookup - 4.5 miles What.town(s) does this hookup serve - Rochester 3) Utilities Available; Distance to nearest major transmission line 1.3 miles Type of transmission line - 345 KV 4) Gas Pipeline; Distance to nearest gas main 5.0 miles F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 126) Distance to primary roaId - 4.0 miles (State Highway 125) 2) Railroad; Site serviced by rail - No Distance to active rail line 5.3 miles BRENTWOOD - - - - - - - - - - - - - za 7 -, C ROCKINGHAM 12:116m Brentwood COUNTY FARM Cor ers a Town; Brentwood Br-1 B r Hill T, B N T mc tmill 4? WO POPULATION (3 Col i 1,468 Col JA boa Q 0 (a a 0jQ ta 6(00@ 11 Br d entwoo C Fm it 0 River E3r "Br G1 N 10 126 4@1 KIN STDN ,z 2 TOWN: BRENTWOOD A. Site BR-I B. Size - Approximately 1230 acres C. Current Status 1) Existing Land Use: Forested Lands - 70% 2) Zoning Status: Medium Density Residential - 85% Open/Uncultivated - 25% Commercial - 15% Agricultural - 5% D. Land and Water Resources 1) Land Capability: Excellent 80% 2) Adjacent to surface fresh water Yes Good 5% Distance on site (Dudley Brook) Fair 5% .15 miles (Piscassic River) Poor 10% 3) Adjacent to Aquifer No Distance .5 miles E. Utilities and Services 1) Distance to nearest major water hookup [email protected] miles What town(s) does this hookup serve Epping 2) Distance to nearest sewer hookup - 1.0 miles What town(s) does this hookup serve - Epping 3) Utilities Available; Distance to nearest major transmission line .7 miles Type of transmissicn.line - 115 KV 4) Gas Pipeline; Distance to nearest gas main 4.0 miles F. Transportation 1) Highway; Type of road which services or is nearest to site primary (State Highway 101, State Highway 125) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - No Distance to active rail line .6 miles TOWN; ORENTWQQD A. Site BR-2 B. Size Approximately 900 acres C. Current Status 1) Existing Land Use: Forested Lands 65% 2) Zoning Status: Medium Density Residential - 60% Open/Uncultivated - 15% Commercial - 40% r.xtractive, Quarry, Sandpit - '10% Agricultural - Marshlands - 5% D. Land and Water Resources 1) Land Capability: Excellent - 60% 2) Adjacent to surface fresh water No Good - 20% Distance l.miles (Fresh River) Poor - 20% .1 mil6s (Dudley Brook) 3) Adjacent to Aquifer - Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup 1.75 miles What town(s) does this hookup serve - Exeter 2) Distance to nearest sewer hookup - 1.75 miles What town(s) does this hookup serve - Exeter 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line - 115 KV 4), Gas Pipeline; Distance to nearest gas main - 2.0 miles F. Transportation 1) Highway; Type of road which services or Is nearest to site primary (State Highway 10 1,) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - No Distance to active rail line - 1.3 miles TOWN: BRENTWOOP A. Site BR-3 B. Size Approximately 440 acres C. Current Status 1) Existing Land Use: Forested Lands - 65% 2) Zoning Status: Medium Density Residential - 85% Open/Uncultivated - 35% Commercial - 15% D. Land and Water Resources 1) Land Capability: Excellent - 90% 2) Adjacent to surface fresh water - Yes Poor - 10% Distance on site (Exeter River) 3) Adjacent to Aquifer - Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup 3.5 miles What town(s) does this hookup serve - Epping 2) Distance to nearest sewer hookup - 3.0 miles .What town(s) does this hookup serve - Epping 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line.- 115 KV 4) Gas Pipeline; Distance to nearest gas main 4.25 miles F. Transportation 1) Highway; Type of road which services or is nearest to site primary (State Highway 125) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - No Distance to active rail line 1.6 miles TOWN: BRENTWOOD A. Site..- BR-4 B. Size Approximately 460 acres C. Current Status 1) Existing Land Use: Forested Lands - 80% 2) Zoning Status: Medium Density Residential - 65% Open/Uncultivated - 15% Commercial - 35% Institutional - 5% D. Land and Water Resources 1) Land Capability: Excellent - 957. 2) Adjacent to surface fresh water - Yes, Poor - 5% Distance on site (Little River) 3) Adjacent to Aquifer Yes Distance - adjacent E. Utilities and Services 1) Distance to nearest major water hookup 3.25 miles What town(s).does this hookup serve - Exeter 2) Distance to nearest sewer hookup - 3.25 miles What town(s) does this hookup serve - Exeter 3) Utilities Available; Distance to nearest m,6jor transmission line 1.3 miles Type of transmission line 115 KV 4) Gas Pipeline; Distance to nearest gas main*- 2.5 miles F. Transportation 1) Highway; Type of road which services or is nearest to site primary (State Highway 125) Distance to primary 'road - on site 2) Railroad; Site serviced by rail - No Distance to active rail line.- 2.5 miles TOWN; VENTWOOD A. Site - BR-5 B. Size - Approximately 1380 acres C. Current Status 1) Existing Land Use: Forested Lands 95% 2) Zoning Status: Medium Density Residential 90% Open/Uncultivated 5% Commercial 10%, D. Land and Water Resources 1) Land Capability: Excellent - 80% 2) Adjacent to surface fresh water - Yes Good - 10% Distance on site (Exeter River) Fair - 5% Poor - 5% 3) Adjacent to Aquifer No Distance - .5 miles E. Utilities and Services 1) Distance to nearest major water hookup 2.2151 miles What town(s) does this hookup serve - Exeter 2) Distance to nearest sewer hookup - 2.5 miles What town(s) does this hookup serve - Exeter 3) Utilities Available; Distance to nearest major transmission line .3 miles Type of transmission line - 115 KV 4) Gas Pipeline; Distance to nearest gas main 2.25 miles F. Transportation 1) Highway; Type of road which services or is nearest to site primary (State Highway 125) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - No Distance to active rail line 2.3 miles P-M ibbelts 00 Hill 00 F, :-Ij IN *Town: Brookfield '00* 0-1 RR. 6 Tumoledown,, ffingswood D- ----------- 0- 0 K F' 1970 POPULATION 1 8 Copple Crown Mtn. 0 HIIIS MOOSE VNTAIN SKI AREA 1695/7*@' MOUVOin Loh? Moose Mountains 0 ly V rr TOWN; BKOKFTUP A. Site BRO-1 B. Size Approximately 640 acres C. Current Status 1) Exist-Ing Land Use: Forested Lands 85% 2) Zoning Status: Single Zoning Open/Uncultivated 15% D. Land and Water Resources 1) Land Capability: Good - 80% 2) Adjacent to surface fresh water No Fair - 15% Distance .15 mile (Cooks Pond) Poor - 5% 3) Adjacent to Aquifer - Yes Distance - adjacent E. Utilities and Services 1) Distance to nearest major water hookup -.2.0 miles What town(s) does this hookup serve - Wakefield 2) Distance to nearest sewer hookup - 4.5 miles What town(s) does this hookup serve - Wolfeboro 3) Utilities Available; Distance to nearest major transmission line 6.7 miles Type of transmission line - 33 KV 4) Gas Pipeline; Distante to nearest gas main 16.0 miles F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 109) Distance to primary road - 1.7 miles (State Highway 16) 2) 'Railroad; Site serviced by rail - No Distance to active rail line .2 mile TOWN: BROOKFIELD A. Site - BRO-2 B. Size - Approximately 1150 acres C. Current Status 1) Existing Land Use: Forested Lands - 85% 2) Zoning Status: Single Zoning Marshlands - 5% Water Area - 5% Residential - less than 5% Open/Uncultivated - less than 5% D. Land and Water Resources 1) Land Capability: Excellent - 50% 2) Adjacent to surface fresh water Yes - Good - 45% Distance on site (Pike Brook) Poor - 5% .2 mile @Branch River) .4 mile Cooks Pond) 3) Adjacent to Aquifer Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup on site What town(s) does this hookup serve - Wakefield, Brookfield 2) Distance to nearest sewer hookup - 5.5 miles What town(s) does this hookup serve - Wolfeboro 3) Utilities Available; Distance to nearest major transmission line 8.2 miles Type of transmission line - 33 KV 4) Gas Pipeline; Distance to nearest gas main - 14.5 miles F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (State Highway.109) Distance to primary road - .2 mile (State',Highway 16) 2) Railroad; Site serviced by rail - Yes Distance to active rail line on site TOWN: BROQUIF0 A. Site - BRO-3 B. Size - Approximately 1020 acres C. Current Status 1) Existing Land Use: Forested Lands - 90% 2) Zoning Status: Single Zoning Open/Uncultivated - 5% Residential - less,-than 5% Industrial - less than 5% D. Land and Water Resources 1) I-and Capability: Excellent - 70% 2) Adjacent to surface fresh water Yes Good - 20% Distance on site (Pine Brook, Churchill Brook) Poor - 10% adjacent (Hanson Brook) .1 mile (Branch River) 3) Adjacent to Aquifer Yes Distance on site E. Utilities and Services 1) Distance to nearest major water hookup on site. What town(s) does this hookup serve - Wakefield, Brookfield 2) Distance to nearest sewer hookop - 5.75 miles What town(s) does this hookup serve - Wolfeboro 3) Utilities Available; Distance to nearest major transmission line 8.5 miles Type of transmission line - 310 4) Gas Pipeline; Distance to nearest gas main 13.25 miles F. Transportation 1) Highway; Type of road which services,:,or is nearest to site-- secondary (State Highway 109) Distance to primary road - .2 mile (State Highway 16,.). 2) Railroad; Site serviced by rail - No Distance to active rail line .6 mile OK *Town: Candia x1, ur N V. 0 St .. 2h ............ 13 Vz Hill 4D N LAND CAPABILITY Intense Development Capability Moderate Development Capability TOWN: CANDIA A. Site - The Town of Candia B. Size - Approximately 19,136 acres C. Current Status 1) Existing Land Use: Forested Lands - 85% 2) Zoning Status: Medium Density Residential - 90% Marshlands - less than 5% Commercial . - 5% Water Areas - less than 5% Recreational - 5% Open/Uncultivated - less than 5% Agriculture - less than 5% Extractive, Quarr , Sandpit - less than 5% Residential - less than 5% Institutional - less than 5% Golf Course - less than 5% D. Land and Water Resources 1) Land Capability: Excellent - 15% 2) Adjacent to,surface fresh water Yes Good - 55% Distance on site (Lamprey River, North Branch Fair - 15% River, Meadow Brook, Maple Poor - 10% Falls Brook, Tower Hill Pond, Existing Urban - 5% Kinnikum Pond, Murry Mill Brook) 3) Adjacent to Aquifer - No Distance - .75 mile (Deerfield) E. Utilities and Services 1) Distance to nearest major water hookup 1.5 miles What town(s) does this hookup serve - Auburn (w/Manchester) 2) Distance to nearest sewer hookup - 1.75 miles What town(s) does this hookup serve - Hooksett 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line - 115 KV 4) Gas Pipeline; Distance to nearest gas main 14.25 miles F. Transportation 1) Highway; Type of road which services or is nearest to site primary (State Highway 101) secondary (State Highway IOIB, State Highway 107A) Distance to primary road on site (State Highway 101) 2) Railroad; Site serviced by rail - Yes Distance to active rail line on site N *Town: Chester ch Y/,?Oi. VD er ......... . A It LAND CAPABILITY Intense Development Moderate Developme 102 9 O'k TOWN: CHESTER A. Site - The Town of Chester B. Size - Approximately 16,640 acres C. Current Status 1) Existing Land Use: Forested Lands - 85% 2) Zoning Status Medium Density Residential.- 95% Agriculture - 5% Recreational 5% Open/Uncultivated - 5% Residential - less than 5% Marshlands - less than 5% Water Areas - less than 5% Institutional - less than 5% D. Land and Water Resources 1) Land Capability: Excellent 30% 2) Adjacent to surface fresh water Yes Good 30% Distance on site (Exeter River, Wilson Brook, Fair 25% Preston Brook, North Pond) Poor 10% Existing Urban 5% 3) Adjacent to Aquifer - Yes Distance - on site (2 aquifers) E. Utilities and Services 1) Distance to nearest major water hookup 1.5 miles What town(s) does this hookup serve - Derry, Londonderry 2) Distance to nearest sewer hookup - 1.5 miles What town(s) does this hookup serve - Derry 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line - 345 KV, 115 KV 4) Gas Pipeline; Distance to nearest gas main 9.0 miles F. Transportation 1) Highway; Type of road which services or-is nearest to site secondary (State Highway 102, State Highway 121) Distance to primary road - 1.7 miles (State-Highway 101) State Highway 121A 2) Railroad; Site serviced by rail - No Distance to active rail line - 1.05 mileS* 4 ........... ........ .... .. ........ *Town: Danville 1/--% V V . .. ........ 4(, ......... DiO/77011 flona 0 6 A le HAMPS71 EAD N LAND CAPABILITY ;A@ 71, Intense Development Cap2bi I Ity Moderate Development Capability 0 1 2 3 MICFS TOWN: DANVILLF A. Site The Town of Danville B. Size Approximately 7,424 acres C. Current Status 1) Existing Land Use: Forested Lands 85% 2) Zoning Status: Single Zoning Open/Uncultivated 5% Residential less than 5% Agriculture less than 5% Extractive, Quarry, Sandpit less than 5% Marshlands less than 5% Water Areas less than 5% 0. Land and Water Resources 1) Land Capability: Excellent - 50% 2). Adjacent to surface fresh water Yes Good - 20% Distance on site (Long Pond, Cub Pond, Little Fair - 10% Cub Pond, Diamond Pond, Exell.-er Poor - 15% River, Bartlett Brook, Colby Existing Urban - 5% Brook) 3) Adjacent to Aquifer - Yes Distance - on site (2 aquifers plus a cluster of small aquifers) E. Utilities and Services 1) Distance to nearest major water hookup 5.25 miles What town(s) does this hookup serve - Epping or Raymond 2) Distance to nearest sewer hookup - 4.75 miles What town(s) does this hookup serve - Epping 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line - 115 KV 4) Gas Pipeline; Distance to nearest gas main 3.5 miles. F. Transportation 1) Highway; Type of road which services or is nearest to site - secondary (State Highway 111) State Highway 111A Distance to nearest primary road - 1.0 mile (State Highway 125) Railroad; Site serviced by rail - No Distance to active rail line - 1.5 miles . @@=,7777.7 Dow Pp,)d )))) JX Deerf iel *Town: 9 4 540 11, Nottingtiam N Mtn, Pond tat 107 @ENH-TV OOVL a IN X De- Deerfield a rag 46 via tea a erfield P(3rade 2 ueerfie A T Center L A.. POPULA euvitts TI De- Hill a m t. PC 3 (p I PAWTUCKAWAY Z!1' Ue-4 STATE 111L De-5 11 BEAR BROOK - PARK STATE PARK &I DEERFIELD .......... ............. FAIR Sou th q GROUNDS Deer field De-7 107A e- 2.4 0 MILEs Qa 7r--, -,T,- *i.," rr TOWN: DEERFIELD A. Site DE-1. B. Size - Approximately 610 acres C. Current Status 1) Existing Land Use: Forested Lands - 90% 2) Zoning Status: Medium Density Residential - 90% Open/Uncultivated - 5% Commercial - 10% Extractive, Quarry, Sandpit - 5% D. Land and Water Resources 1) Land Capability: Excellent 40% 2) Adjacent to surface fresh water - Yes Good 50,110 Distance on site (Lamprey River, Freeses Pond) Fair 5% Poor 5% 3.) Adj4cent to Aquifer No, Distance - 2.0 miles E. Utilities and Services 1) Distance to nearest major water hookup 4.5 miles What town(s) does this hookup serve - Epsom 2) Distance to nearest sewer hookup - 9.0 miles What town(s) does this hookup ser\e - Allenstown, Pembroke 3) Utilities Available; Di.stance to nearest major transmission line .9 miles Type ofAransmission line - 115 KV 4) Gas Pipeline; Distance to nearest gas main 14.5 miles F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 107, State Highway 43) Distance to primary road - 3.25 miles (U.S. 4) 2) Railroad; Site serviced by rail - No Distance to active rail line 7.5 miles @TOWN.- PURFIEW A. Site DE-2 B. Size Approximately 1100 acres C. Current Status 1). Existing Land Use: Forested Lands - 85% 2) Zoning Status: Medium Density Residential 100% Agriculture - 5% Open/Uncultivated - 5% Marshlands - 5% D. Land and Water Resources 1) Land Capability: Excellent - 10% 2) Adjacent to surface fresh water Yes Good - 850110 Distance on site (Lamprey River, Freeses Pond) 5 Fair % 3) Adjacent to Aquifer No Distance - 1.5 miles E. Utilities and Services 1) Distance to nearest major water hookup 3.75 miles What town(s) does this hookup serve - Epsom 2) Distance to nearest sewer hookup - 7.5 miles What town(s) does this hookup serve - Allenstown, Pembroke 3) Utilities Available; Distance to nearest major transmission line .4 miles Type of transmission line - 115 KV 4) Gas Pipeline; Distance to nearest gas main 15.25 miles F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 107) Distance to primary road - 3.5 miles (U.S. 4) 2) Railroad; Site serviced by rail - No Distance to active rail line 6.8 miles TOWN: KERFIE1.0 A. Site DE-3 B. Size - Approximately 360 acres C. Current Status 1) Existing Land Use.: Forested Lands - 60%9 2) Zoning Status: Medium Density Residential 100% Open/Uncultivated - 30% Water Area - 10% D. Land and Water Resources 1) Land Capability: Good - 80% 2) Adjacent to SUrface fresh w ater Yes Fair - 10% Distance on site (Nichols Brook) Poor -.10% .05 mile (Lamprey River) 3) Adjacent to Aquifer No Distance - .75 miles E. U-It-.ilities and Services 1) Distance to nearest major water hookup 5.5 miles What town(s) does this hookup serve - Raymond .2) Distance to nearest sewer hookup - 8.5 miles What town(s) does this hookup serve - Allenstown, Pembroke 3) Utilities Available; Distance to nearest major transmission line .1 mile Type of transmission line - 115 KV 4) Gas Pipeline; Distance to nearest gas main 16.5 miles F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 107). Distance to primary road - 3.5 miles.(State Highway 101) 2) Railroad; Site serviced by rail - No Distance to active rail line 4.9 miles TOWN: DEERFIELP A. Site DE-4 B. Size - Approximately 1540 acres C. Current Status 1) Existing Land Use: Forested Lands - 90% 2) Zoning Status: Medium Density Residential 100% Open/Uncultivated - 5/00 Marshlands - 5% D. Land and Water Resources 1) Land Capability: Excellent - 10% 2) Adjacent to surface fresh water Yes Good - 80% Distance on site (Lamprey River) Fair - 5% Poor - 5% 3) Adjacent to Aquifer No Distance - .25 miles E. Utilities and Services 1) Distance to'nearest major water hookup 4.5 miles What town(s) does this hookup serve - Raymond 2) Distance to nearest sewer hookup - 8.5 miles What town(s) does this hookup serve - Epping 3) Utiliti es Available; Distance to nearest major transmission line on site Type of transmission line - 115 KV 4) Gas*Pipeline; Distance to nearest gas main 15.0 miles F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 107) Distance to primary road - 2.6 miles (State Highway 101) 2) Railroad; Site serviced by rail - No Distance to active rail line 4.2 miles TOWN DEERFIELP A. Site DE-5 05 B. Size Approximately 3380 acres C. Current Status 1) Existing Land Use: Forested Lands - 90% 2) Zoning StatLIS: Medium Density Residential 100% Open/Uncultivated - 5% Marshlands - 5% D. Land and Water Resources 1) Land Capability: Excellent 10% 2) AdJacent to surface fresh water - Yes Good 80% Distance on site (Lamprey River, Hartford Brook) Fair 5% Poor 5% 3) Adjacent to Aquifer Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup 4.75 miles What town(s) does this hookup serve Raymond 2) Distance to nearest sewer hookup - 5.75 miles What town(s) does this hookup serve - Allenstown, Pembroke 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line - 115 KV 4) Gas Pipeline; Distance to nearest gas main - 16.25 miles F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 107, State Highway 107A) Distance to primary road - 2.3 miles (State Highway 101) 2) Railroad; Site serviced by rail - No Distance to active rail line 3.5 miles TOWN: DEERFIELD Site DE-6 B. Size Approximately 920 acres. C. Current Status 1) Existing Land Use: Forested Lands - 90% 2) Zoning Status:, Medium Density Residenti6l 100% Open/Uncultivated - 5% Marshlands - 5% .D. Land and Water Resources 1) Land Capability: Excellent - 10% 2) Adjacent to surface fresh water Yes Good - 75% Distance adjacent (Lamprey River) Fair - 10% Poor - 5% 3) Adjacent to Aquifer No Distance - .5 miles E. Utilities and Services 1) Distance to nearest major water hookup 2.75 miles What town(s) does this hookup serve - Raymond 2-) Distance to nearest sewer hookup - 7.0 miles What town(s) does thishookup serve - Epping 3) Utilities Available; Distance to nearest major transmission line on site lype of transmission line - 345 KV 4) Gas Pipeline; Dista nce.to nearest gas main 14.0 miles F. Trans2ortation 1) Highway; Type of road which services or is nearest to site �econdary (State Highway 107) Distance to primary road - 1.1 miles (State Highway 101) 2) Railroad; Site serviced by rail - No Distance to active rail line 2.9 miles TOWN: DEERFIELD A. Site - DE-7 B. Size - Approximately 820 acres C. Current Status 1) Existing Land Use: Forested Lands - 70% 2) Zoning Status: Medium Density Residential 100% Recreation - 10% Open/Uncultivated - 10% Marshlands - 10% D. Land and Water Resources 1) Land Capability: Excellent - 40% 2) Adjacent to surface fresh water - Yes Good - 50% Distance on site (Lamprey River) Poor - 10% 3) Adjacent to Aquifer Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup 3. 0 miles What town(s) does this hookup serve - Raymond 2) Distance to nearest sewer hookup - 7.75 miles What town(s) does this hookup serve - Epping' 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line - 345 KV 4). Gas Pipeline; Distance to nearest gas main 14.70' miles F. Transportation 1) Highway; Type of raod which services or is nearest to site secondary (State Highway 107, State Highway 107A) Distance to primary road - 1.2 miles (State Highway 101) 2) Railroad; Site serviced by rail - No Distance to active rail line 2.7.miles TOWN: DEERFIELD A. Site DE-8 B. Size - Approximately 1790 acres C. Current Status 1) Exi*sting Land Use: Forested Lands - 90% 2) Zoning Status: Medium Density Residential - 85% Open/Uncultivated - 5% Recreation - 15% Marshlands - 5% D. Land and Water Resources 1) Land Capability: Excellent - 15% 2) Adjacent to surface fresh water Yes Good - 75% Distance on site (North Branch River Fair - 10% .1 mile (Beaver Pond) 3) Adjacent to Aquifer No Distance - .75 miles E. Utilities and Services 1) Distance to nearest major water hookup 5.0 miles - What town(s) does this hookup serve - Raymond 2) Distance to nearest sewer hookup - 5.25 miles What town(s) does this hookup serve - Allenstown, Pembroke 3) Utilities Available; Distance to nearest major transmission line on site iype of transmission line - 115 KV 4) Gas Pipeline; Distance to nearest gas main 17.0 miles F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 107A) Distance to primary road - 1.9 miles (State Highway 101) 2) Railroad; Site serviced by rail - No Distance to active railline 2.9 miles 7@ E k *Town: E@st Kingston Ito M Cl fa 41 Eki-2 x"", z"k "A' 13 00" r G U, I., I&Q. 9 East Quo I K i n q s @N--, ow low cc""( 6 IN I - I , D, 5" 4 ki-3 K 0, A6 LING \FALLS DAM N 1z NEWTON OQ-T %In TOWN: EAST KINGSTON A. Si-'#,.e EKI-1 .B. Size - Approximately 510 acres C. Current Status 1) Existing Land Use: Forested Lands 80% 2) Zoning Status: Single Zoning Open/Uncultivated -.15% Agricultural 5% D. Land and Watpr Resources I). Land Capability: Excellent 35% 2) Adjacent to surface fresh Water Yes Good 60% Distance on site (York Brook,)Brickyard Brook, Poor 5% Great Broo 3) Adjacent to Aquifer No Distance - .25 miles E. Utilities and Services 1) Distance to nearest major water hookup 1.25 miles What town(s) does this hookup serve - Exeter 2) Distance to nearest sewer hookup - 1.0'.miles What town(s) does this hookup serve - Exeter 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line 33 KV 4) Gas Pipeline; Distance to nearest g'as.main on site F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 108) Distance to primary road - 2.25 miles (State Highway 125) 2) Railroad; Site serviced by rail - Yes Distance to active rail line on site TOWN: EAST KINGSTON. A. Site EKI-2 B. Size Approximately 330 acres C. Current Status 1) Existing Land Use: Forested Lands 70% 2) Zoning Status: Single Zoning Open/Uncultivated - 15% Residential - 10% Agricultural - 5% D. Land and Water Resources 1) Land Capability: Excellent - 95%. 2) Adjacent to surface fresh water No Poor - 5% Distance .5 miles (Powwow Pond) 3),._Adjacent to Aquifer No Distance - .5 miles E. Utilities and Services 1) Distance to nearest major water hookup 3.0 miles What town(s) does this hookup serve - Exeter 92) Distance to nearest sewer hookup 2.75 miles What town(s) does this hookup serve - Exeter 3) Utilities Available; Distance to nearest major transmission line .2 miles Type of transmission line - 33 KV 4) Gas Pipeline; Distance to nearest gas main - .25 miles F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 107, State Highway 108) Distance to primary road - .8 miles (State Highway 125) 2) Railroad; Site serviced by rail Yes Distance to active rail line on site TQM EA$T KINGSTON A. Site - EKI-3 B. Size - Approximately 2160 acres C. Current Status 1) Existing Land Use: Forested Lands - 80% 2) Zoning Statu s Single Zoning Open/Uncultivated - 15% Agricultural - 5% D. Land and Water Resources 1) Land Capability: Excellent - 60% 2) Adjacent to surface fresh water Yes Good - 20% Distance on site (Great Brook) Poor - 20% 3) Adjacent to Aquifer - No Distance - 1.0 miles E. Utilities and Services 1) Distance to nearest major water hookup 3.25 miles What town(s) does this hookup, serve - Seabrook 2) Distance to nearest sewer hookup - 3.0 miles What town(s) does this hookup serve - Exete .r 3) Utilities Available; Distance to nearest major transmission line 1.7 miles Type -of transmission li.ne - 33 KV 4) Gas Pipeline; Distance to nearest gas main adjacent F. Trans ortation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 107) Distance to primary road - 2.75 miles (State Highway 125) 2) Railroad; Site serviced by rail - No Distance to active rail line .7 miles TOWN: EAST KINGSTON A. Site EKI-4 B. Size Approximately 260 acres C. Current Status 1) Existing Land Use: Forested Lands :85% 2) Zoning Status: Single Zoning Open/Uncultivated - 10% Marshlands - 5% D. Land and Water Resources 1) Land Capability: Excellent - 75% 2). Adjacent to surface fresh water No Poor - 25% Distance .3 miles (Powwow River) 3) Adjacent to Aquifer No Distance - .5 miles E. Utilities and Services Distance to nearest major water hookup 3 25 miles What town(s) does this hookup serve - Seab@ook 2) Distance to nearest sewer hookup - 4.0 miles What town(s) does this hookup serve - Exeter 3) Ut1litles Available; Distance-to nearest major transmission line 2.5 miles Type of transmission line - 33 KV 4) Gas Pipeline; Distance to nearest gas main - .5 miles F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 107A) Distance to primary road - 2.75 miles (State Highway 125) 2) Railroad; Site serviced by rail - No Distance to active rail line 1.2 miles TOWN: EAST KINGSTON A. Site - EKI-5 B. Size - Approximately 490 acres C. Current Status 1) Existing Land Use: Forested Lands - 80% 2) Zoning Status: Single Zoning Residential - I OC, Agricultural - 5% Institutional - 5% D. Land and Water Resources 1) Land Capability: Excellent-- 90% 2) Adjacent to surface fresh water No Poor - 10% Distance .05 miles (Powwow Pond) 3) Adjacent to Aquifer Yes Distance - on site E. Utilities and Senvices 1) Distance to nearest major water hookup 3.75 miles What town(s) does this hookup serve - Exeter Distance to nearest sewer hookup - 3.5 miles What town(s) does this hookup serve - Exeter 3) Utilities Available' Distance to nearestmajor transmission line-- 1.2.miles Type of transmission.line - 33 KV 4) Gas Pipeline; Distance to nearest gas main - on site Trans2ortation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 107A, State Highway 108) Distance to primary road - 1.25 miles (State Highway 125) 2) Railroad; Site serviced by rail - Yes Distance to active rail line on site 77 @Cri* TV, G L E zo5 oil 0 EP @31111 10 KennUrd Hill car ri fj J. it Ep to Ep-2 0 V 1970 POPULATIO 2,356 4 a P A4 EPPING ,gag POP. 1,097 ZL a S LAOPf? 0 13: I u4j%. 93 a 0 HEDDING Ep- West Epping 6 Qmu River Ep-1 Ssic P'SC Cal RENTWO00 *Town:.Epping N z k? 71171 M I @ -71 IMIM TOVi'N EPPING A. Site - EP-1 B Size - Approximately.2560 acres C. Current Status 1) Existing Land Use: Forested Lands - 95% 2) Zoning Status: Medium Density Residential 1,00% Open/Uncultivated - 5% D. Land and Water ReSOUrces 1) Land Capability: Excellent - 80% 2) Adjacent to surface fresh water - Yes Good - 10% Distance on site (Lamprey River, Pawtuckaway River, Poor - loy" Bunker Pond) 3) Adjacent to Aquifer - Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup .8 miles What town(s) does this hookup serve Raymond, 2) Distance to nearest sewer hookup - 1.0 miles What town(s) does th 1s hookup serve - Epping 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line - 33 KV 4) Gas Pipeline; Distance to nearest gas main 7.75 miles F. Transportation 1) Highway; Type of road which services or is nearest to site primary (State Highway 101) Distance to primary road - on site 2) Railroad; Site serviced by rail - Yes Distance to active rail line on site TOWN: EPPING A. Site - EP-2 B. Size - Approximately 1080 acres C. Current Status 1) Existing Land Use: Forested Lands - 75% 2) Zoning Status: Medium Density Residential - 85% Marshlands - 10% High Density Residential - 15% Residential - 5% Agricultural - 5% Open/Uncultivated - 5% D. Land and Water Resources 1) Land Capability: Excellent - 70% 2) Adjacent to surface fresh water Yes Good - 20% Distance on site (Tributaries of the Lamprey River) Poor - 10% .3 miles (Lamprey River) 3) Adjacent to Aquifer Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup on site What town(s) does this hookup serve - Epping 2) Distance to nearest sewer, hookup - on site What town(s) does this hookup serve - Epping 3) Utilities Available; Distance to nearest major transmission line .3 miles Type of transmission line - 33 KV 4) Gas Pipeline; Distance to nearest gas main 6.25 miles F. Transportation 1) Highway; Type of road which services or is nearest to site primary (State Highway 125) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - No Distance to active rail line .8 mile-s TOWN: FPPING A. Site EP-3 B. Size Approximately 640 acres C. Current Status 1) Existing Land Use: Forested Lands - 90% 2) Zoning Status: Medium Density Residential 100% Open/Uncultivated - 10/1. D. Land and Water Resources 1) Land Capability: Excellent - 70% ..2) Adjacent to surface fresh water Yes Good - 25% Distance on site (North River, small ponds) Poor - 5% 3) Adjacent to Aquifer - Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup 1.0 mile What town(s) does this hookup serve - Epping 2) Distance to nearest sewer hookup - 1.0 mile@- What town(s) does this hookup serve - Epping 3) Utilities Available; Distance to nearest major transmission line .5 miles Type of transmission line - 33 KV 4). Gas Pipeline; Distance to nearest gas main - 6.75 miles F. Transportation 1) Highway; Type of road which services or is nearest to site primary (State Highway 125) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - No Distance to active rail line 2.1 miles TOWN: EPPING A. Site EP-4 B. Size Approximately 440 acres C. Current StatLIS 1) Existing Land Use: Forested Lands - 75% 2) Zoning Status: Medium Density Residential 100% Open/Uncultivated - 15% Agricultural - 10% D. Land and Wa'ter Resources 1) Land Capability: Excellent,- 85% 2) Adjacent to surface fresh water - Yes Good - 5% Distance on site (Tributaries of the North and Poor - 10% Lamprey Rivers) .1 miles (North River) 3) Adjacent to Aquifer Yes .55 miles (Lamprey River) Distance - on site E. Utilities and Services 1) 'Distance to nearest major water hookup 1.0 miles What town(s) does this hookup serve - Epping 2) Distance to nearest sewer hookup - 1.0 mfles What town(s) does this hookup serve - Epping 3) Utilities Available; Distance to nearest major transmission line ad4acent %J Type of transmission line - 33 KV 4) Gas Pipeline; Distance to nearest gas main 6.25 miles F. Transportation 1) Highway; Type of road which services or is nearest to site primary (State Highway 125) Distance to primary road - adjacent 2). Railroad; Site serviced by rail - No Distance to active rail line 2.0 miles 'PPING TOWN: A. Site EP-5 B. Size.- Approximately 510 acres C. Current Status 1) Existing Land Use: Forested Lands - 75% 2) Zoning Status: Medium Density Residential 100% Open/Uncultivated - 10% Residential - 5% Marshlands - 5% Extractive, Quarry, Sandpit - 5% D. Land and Water Resources 1) Land Capability: Excellent - 90% 2) Adjacent to surface fresh water Yes Good - 5% Distance on site (Lamprey River) Poor - 5% 3) Adjacent to Aquifer Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup .6 miles What town(s) does this hookup serve - Epping 2) Distance to nearest sewer hookup - .4 miles What town(s) does this hookup serve - Epping 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line - 33 KV 4) Gas Pipeline; Distance to nearest gas main 5.5 miles F. Transportation 1) Highway; Type of road which services or is nearest to site primary (State Highway 125) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - No Distance to active rail line .6 miles TOWN: EPPING A. Site - EP-6 B. Size - Approximately 490 acres C. Current Status 1) Existing Land Use: Forested Lands 50% 2) Zoning Status: Medium Density Residentiaol - 95% Open/Uncultivated - 20% Industrial - 5% Extractive, Quarry, Sandpit - 10% Residential - 5% Commercial - 5% Marshlands - 5% Solid Waste Disposal, Power Plant - 5% D. Land and Water, Resources 1) Land Capability: Excellent - 85% 2) Adjacent to surface fresh water Yes Poor - 5% Distance on site (Lamprey River) Existing Urban - 10% .3 miles (Piscassic River) 3) Adjacent to Aquifer Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup adjacent What town(s) does this hookup serve Epping 2) Distance to nearest sewer hookup - on site What town(s) does this hookup serve - Epping 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line - 33 4) Gas Pipeline; Distance to nearest gas main - 5.0 miles F. Trans ortation 1) Highway; Type of road which services or is nearest to site primary (State Highway 125) Distance to primary road - adjacent 2) Railroad; Site serviced by rail Yes Distance to active rail line on site *@oWn: Farmington N .......... . Fa -5 BCD FARMI NGTON POP 2,884 TRAILER RAIL RA.K 4 Whitehouse Mtn. it Q, esn Fa-7 .,Jet 0 SCH -I" R A u t I.. '4, 1970 It POPULATION Chesley Mtn. 3,5S Fa Nubb)e 11 Hussey Mtn. 3 6 Pond 11 Nubble Mtn. 111. 1@0 BLUE JOB MTK STATE FOREST Oxbow <5' Pond D: Blue Job Qi@ W- LOA 0Of mg, -777V771-170 @P5 5 RA TOWN: FARMINGTON A. Site FA-1 B. Size Approximately 510 acres C. Current Status 1) Existing Land Use: Forested Lands - 90% 2) Zoning Status: No Zoning Residential - 10% D. Land and Water Resources 1) Land Capability: Excellent - 60% 2) Adjacent to surface fresh water Yes Good - 40% Distance - on site (Ela River) adjacent (Cocheco River) 3) Adjacent to Aquifer - Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup on site What town(s) does this hookup serve - Farmington 2) Distance to nearest sewer hookup - .25 mile What town(s) does this hookup serve - Farmington 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line - 33 KV 4) Gas Pipeline; Distance to nea@est gas main 6.25 miles F. Transportation 1) Highway; Type of road which services or is nearest to site primary (State Highway 11) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - No Distance to active rail line 1.3 miles TOWN: FARMINQTON A. Site FA-2 B. Size - Approximately 230 acres C. Current Status 1) Existing Land Use: Forested Lands - 85% 2) Zoning Status: No Zoning Residential - 15% D. Land and Water Resources 1) Land Capability: Excellent - 90% 2) Adjacent to surface fresh water Yes Poor - 10% Distance adjacent (Dames Brook) 3) Adjacent to Aquifer Yes Distance - adjacent E. Utilities and Services 1) Distance to nearest major water hookup on site What town(s) does this hookup serve - Farmington 2) Distance to nearest sewer hookup - .2 mile What town(s) does this hookup serve - Farmington 3) Utilities Available; Distance to nearest major transmission line 1.2 miles Type of transmission line - 33 KV 4) Gas Pipeline; Distance to nearest gas main - 5.715 miles F. Transportation 1), Highway; Type of road which services or is nearest, to site secondary (town road) Distance to primary road - 1.4 miles (State Highway 11) 2) Railroad; Site serviced by rail - No 'Distance to active rail line 1.5 miles TOWN: FAPSINGTON A. Site - FA-3 B. Size - Approximately 510 acres C. Current Status 1) Existing Land Use: Forested Lands - 701% 2) Zoning Status: No Zoning Extractive, Quarry, Sandpit - 10/10 Open/Uncultivated - 10% Marshlands 10% D. Land and Water Resources 1) Land Capability: Excellent - 85% 2). Adjacent to surface fresh water Yes Poor - 15% Distance on site (Pokamoonshine Brook) .05 mile (Cocheco River) 3) Adjacent to Aquifer Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup on site What town(s) does this hookup serve - Farmington 2) Distance to nearest sewer hookup - on site What town(s) does this hookup serve - Farmington 3) Utilities Available; Distance to nearest major@transmission line on site Type of transmission line - 33 KV 4) Gas Pipeline; Distance to nearest gas main - 4.0 miles, F. Transportation 1) Highway; Type of road which services or is nearest to site - primary (State Highway 11) secondary (town road), Distance to primary road - adjacent 2) Railroad; Site serviced by rail Yes Distance to active rail line adjacent TOWN: FARMTNOTON A. Site FA-4 B. Size Approximately 230 acres C. Current Status 1) Existing Land Use: Forested Lands - 85% 2) Zoning Status: No Zoninal Industrial - 10% Open/Uncultivated - 5% D. Land and Water Resources 1) Land Capability: Good - 90% 2) Adjacent to surface fresh water Yes Poor - 10% Distance adjacent (Pokamoonshine Brook) 3), Adjacent to Aquifer - Yes Distance - adjacent E. Utilities and Services 1) D4stanc- to nearest major water hookup on site - Nat tow'n(s) does this hookup serve - Farmington 2) Distance to nearest sewer hookup - .6 mile What town(s) does this hookup serve - Farmington Distance to nearest major transmission line .2 mile 3) Utilities Available-, Type of transmission line - 33 KV 4) Gas Pipeline; Distance to nearest gas main 4.0 miles F. Transportation 1) Highway; Type of road which services or is nearest to site primary (State Highway 11) Distance to primary road - adjacent 2) Railroad; Site serviced by rail -r Yes Distance to active rail line on site FA@RMT TOWN: NGTON A. Site - FA-5 B. Size - Approximately 1790 acres C. Current Status 1) Existing Land Use: Forested Lands - 80% 2) Zoning Status: No Zoning Open/Uncultivated - 10% Extractive, Quarry, Sandpit - 5% Residential - 5% D. Land and Water Resources 1) Land Capability: Excellent - 60% 2) Adjacent to surface fresh water Yes Good - 30% Distance on site (Dames Brook, Cocheco River) Poor - 10% 3) Adjacent to Aquifer Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup on site What town(s) does thi-s hookup serve - Farmington 2) Distance to nearest sewer hookup - adjacent What town(s) does this hookup serve - Farmington 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line - 33 KV 4) Gas Pipeline; Distance to nearest gas main 2.75 miles F. Trans2ortation 1) Highway; Type of road which services or is nearest to site primary (State Highway 11) Distance to primary road - adjacent 2) Railroad;-.Site serviced by rail - No Distance to active rail line .1 mile TOWN: FARMINGTON A. Site FA-6 B. Size Approximately 510 acres C. Current Status 1) Existing Land Use: Forested Lands - 95% 2) Zoning Status: No Zoning Open/Uncultivated - 5% D. Land and Water Resources 1) Land Capability: Excellent - 50% 2) Adjacent to surface fresh water No Good - 50% Distance .7 mile (Cocheco River) 3) Adjacent to Aquifer Yes Distance - adjacent E. Utilities and Services 1) Distance "(-.o nearest major water hookup .3 mile What town(s) does this hookup serve - Farmington 2) Distance to nearest sewer hookup - 1.6 mile What town(s) does this hookup serve - Farmington 3) Utilities Available; Distance to nearest major transmission line 1.0 mile Type of transmission line - 33 KV 4) Gas Pipeline; Distance to nearest gas main - 2.25 miles F. Transportation 1) Highway; Type of road which services or is nearest to site primary (State Highway 11) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - Yes Distance to active rail line on site TOWN; FARKNOM A., Site - FA-7 B. Size - Approximately 1100 acres C. Current Status 1) Existing Land Use: Forested Lands - 80% 2) Zoning Status:. No Zoning Extractive, Quarry, Sandpit - 15% Open/Uncultivated - 5% D. Land and Water Resources 1) Land Capability: Excellent - 80% 2) Adjacent to surface fresh water Yes Good - 15% Distance on site (Cocheco River) Poor - 5% 3) Adjacent to Aquifer Yes Distance - on site E. Utilities and Services 1) Di-stance to nearest major water hookup .3 mile. What town(s) does this hookup serve - Farmington 2) Distance to nearest sewer hookup - 1.4 miles What town(s) does this hookup serve - Farmington 3) Utilities Available; Distance to nearest major transmission line .7 mile Type of transmission line - 33 KV 4) Gas Pipeline; Distance to nearest gas main - 1.75 miles F. Transportation 1) Highway; Type of road which services or is nearest to site primary (State Highway 11) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - Yes Distance to active rail line - on site ..... ..... ......... *.-,,--,.,,.. "., 4-0 K *Town: Fr X, X- 993 PU L ATI 0" .......... . .... ........ .... .... .. .......... .... .......... ........... N ........... Sr LAND CAPABILITY Intense Development Capa Moderate Development C TQWIN FUMMT. A. Site - The Town of Fremont B. Size - Approximately 11,008 acres C. Current Status 1) Existing Land Use: Forested Lands - 75% 2) Zoning Status: Single Zoning Marshlands - 15% Open/Uncultivated - 5% Residential - less than 5% Agriculture - less than 5% Water Areas - less than 5% D. Land and Water Resources 1) Land Capability: Excellent - 65% @2) Adjacent to surface fresh water Yes Good - 5% Distance on site (Exeter River, Piscassic River, Fair - 5% Loon Pond) Poor - 20% Existing Urban - 5% 3) Adjacent to Aquifer - Yes Distance - on site (6 aquifers) E. Utilities and Services 1) Distance to nearest major water hookup 1.0 mile :.What town(s) does this hookup serve Epping 2) Distance to nearest sewer hookup - .5 mile What town(s) does this hookup serve - Epping 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line - 115 KV 4) Gas Pipeline; Distance to nearest gas main - 4.75 miles F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (St@te Highway.107) State Highway 111A Distance to primary road - .1 mile (State Highway 125) 2) Railroad; Site serviced by rail - Yes Distance to active rail line on sit-e 7-- C,T E 1) *Town: Kensingt' Br0O* 13 Will Q a 3 .294 vt r n 4 wi Rid ik- no UQ 0 0 Ke- CEO K e0' co 017k Ono c 3.7 47 1 v FA S Ke@@ 40 . - 91 107 4% 9 soul" 0 iF 1! TOWN: KENSINGTON A. Site KE-1 8. Size - Approximately 770 acres C. Current Status 1) Existing Land Use: Forested Lands - 751 2) Zoning Status: Single Zoning Agricultural - 10% Open/Uncultivated - 10% Residential - 5% D. Land and Water Resources 1) Land Capability: Excellent - 20% 2) Adjacent to surface fresh water Yes Good - 70% Distance adjacent (Great Brook, Mill Brook) Poor - 10% on-.site (Hobbs Brook, Spring Brook) 3) Adjacent to Aquifer - Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup 1mile What town(s) does this hookup serve - Exeter 2) Distance to nearest sewer hookup.- I mile What town(s) does this hookup serve - Exeter 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line - 33 KV 4) Gas Pipeline; Distance to nearest gas main .5 miles F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 108, State Highway 150) Distance to primary road - 3.25 miles (State Highway 125) 2) Railroad; Site serviced by rail - No Distance to active rail line .5 miles TOWN: KENSINGTQN A. Site - KE-2 B. Size - Approximately 1080 acres C. Current Status 1) Existing Land Use: Forested Lands - 75% 2) Zoning Status: Single Zoning Open/Uncul-4'.-ivated - 15% Residential - 5% Agricultural - 5% D,. Land and Water Resources 1) Land Capability: Excellent 80% 2) Adjacent to surface fresh water Yes Good 10% Distance adjacent (Philbrook Pond) Poor on site (Mill Brook, Taylor River) 3) Adjacent to Aquifer - Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup .75 miles What town(s) does this hookup serve - Seabrook 2) Distance to nearest sewer hookup 11.5 miles What town(s) does this hookup serve - Exeter 3) Utilities Available; Distance to nearest major transmission line .4 miles Type of transmission line - 33.KV 4) Gas Pipeline; Distance to nearest gas main .75 miles F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 150) Distance to primary road - 2.25 miles (Interstate 95) 2) Railroad; Site serviced by rail - No Distance to active rail line -.2'.0,,';' miles TOWN: KENSINGTON A. Site.- KE-3 B. Size - Approximately 770 acres C. Current Status 1) Existing Land Use: Forested Lands - 75% 2) Zoning Status: Single 7oning Open/Uncultivated - 15% Agricultural - 10% D. Land and Water Resources 1) Land Capability: Excellent 60% 2) Adjacent to surface fresh water Yes Good 30% Distance adjacent (Great Brook, Winkley Brook, Poor 10% Mill Brook) 3) Adjacent to Aquifer Yes Distance on site E. Utilities and Services 1) Distance to nearest major water hookup 1.0 miles What town(s) does this hookup serve - Seabrook 2) Distance to nearest sewer hookup - 2.5 miles What town(s) does this hookup serve - Exeter 3) Utilities Available; Distance to nearest major transmission line 1.4 miles Type of transmission line - 33 KV 4) Gas Pipeline; Distance -to nearest gas main - .25 miles F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 150) Distance to primary road - 2.75 miles (Interstate 95) 2) Railroad; Site serviced by rail - No Distance to active rail line 1.7 miles TOWN; KENSINVON A. Site KE-4 B. Size Approximately 330 acres C. Current Status 1) Existing Land Use: Forested Lands - 65% 2) Zoning Status: Single Zoning Open/Uncultivated - 25% Agricultural - 10% D. Land and Water Resources 1) Land Capability: Excellent - 70% 2) Adjacent to surface fresh water Yes Good - 20% Distance adjacent (Black River, Winkley Brook) Poor - 10% 3) Adjacent to Aquifer No Distance - .25 miles E. Utilities and Services 1) Distance to nearest major water hookup 1.5 miles What town(s) does this hookup serve - Seabrook 2) Distance to nearest sewer hookup - 3.5 miles What town(s) does this hookup serve - Exeter 3) Utilities Available; Distance to nearest major transmission line 2.4 miles Type of transmission line - 33 KV 4) Gas Pipeline; Distance to nearest gas main - on site F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 107) Distance to primary road - 3.5 miles (Interstate 95) 2) Railroad; Site serviced by rail - No Distance 'to active rail line 2.3 miles TOWN: KENSINGTON A. Site KE-5 B. Size Approximately 260 acres C. Current Status 1) Existing Land Use: Forested Lands - 80% 2) Zoning Status: Sing'le Zoning Residential - 10% Open/Uncultivated - 10% D. Land and Water Resources 1) Land Capability: Good - 100% 2) Adjacent to surface fresh watet,@ Yes Distance adjacent (Great Brook) 3) Adjacent to Aquifer No Distance.- .75 miles E. Utilities and Services 1) Distance to nearest major water hookup 2.5 miles What town(s) does this hookup serve - Seabrook .2) Distance to nearest sewer hook6p - 2.75 miles What town(s) does this hookup serve - Exeter 3) Utilities Available; Distance to nearest major transmission line 1.6 miles Type of transmission line .- 33 KV 4) Gas Pipeline; Distance to nearest gas main on site F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 107) Distance to primary road - 3.5 miles (State Highway 125) 2) Railroad; Site serviced by rail - No Distance to active rail line 1.3 miles rO ....... ..... X, 4-N N .. . . . . . . . . . V s t o r, I 7@ @7- Kingst *Town 4:..: KIN---- , --- -------- lo z Pro ........... ILI Q, X .......... WF11 17 ........... V LAND CAPABILITY Intense Development Cap Moderate Development Cz TOWN: KINGSTON A. Site The Town of Kingston B. Size Approximately 12,480 acres C. Current Status 1) Existing Land Use: Forested Lands - 60% 2). Zoning Status: General Zoning - 85% Residential - 10% Medium Density Residential - 5% Marshlands - 10% Commercial -less than 5%'@' Water Areas - less than 5% Inddstrial -less than 5% Recreation - less than 5% Historic -less than 5% Extractive, QUdrry, Sandpit - less than 5% Industrial - less than 5% Commercial - less than 5% Institutional - less than 5% Open/Uncultivated - 5% Agriculture - 5% D. Land and Water Resources 1) Land Capability: -Excellent - 65% 2) Adjacent to surface fresh water Yes Good - 5% Distance on site (Country Pond, Long Pond, Great Fair - 5% Pond, Powwow Pond, Halfmoon Poor - 15% Pond, Greenwood Pond, Little Existing Urban - 10% River, Powwow River, Colby Brook, Cedar Swamp Pond) 3) Adjacent to Aquifer - Yes Distance - on site (6 aquifers) E. Utilities and Services 1) Distance to nearest major water hookup 1.25 miles What town(s) does this hookup serve - Exeter 2) Distance to nearest sewer hookup - 1.25 miles What town(s) does this hookup serve - Exeter 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line 33 KV 4) Gas Pipeline Distance to nearest gas main adjacent F. 'Transportation 1) Highway; Type of road which services or is nearest to site primary (State Highway 125) secondary (State Highway 111, State Highway 107, State Highway 107A) Distance to primary road - on site (State Highway 125) 2) Railroad; Site serviced by rail - Yes Distance to active rail line on site 0 t (> Le-1 125 *Town: Lee O.S. Fig 4 @y 041, Lope Hill 15 Z4, rutfle W TRAILER PARK 16 5 1970 POPUAI", q 3 Le -3 1125 ct 40- S2 cluth ii@ ec e-9/@ cc,, 0 4k Le NEWMARKS1 ROCKlt\jGHAM COUNTY TOWN: LEE A. Site LE-1 B. Size Approximately 1020 acres C. Current Status 1) Existing Land Use: Forested Lands 70% 2) Zoning Status: Medium Density Residential - 75% Open/Uncultivated - 15% Commercial - 25% Extracti've, Quarry, Sandpit - 10/10 Residential - 5% D. Land and Water Resources 1) Land Capability: Excellent - 70% 2) Adjacent to surface fresh water - Yes Good - 20% Distance on site (Oyster River, Dube Brook) Fair 5% Poor 5% 3) Adjacent to Aquifer - Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup 1.5 miles What town(s) does this hookup serve - Durham 2) Distance to nearest sewer hookup - 1.25 miles What town(s) does this hookup serve - Durham 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line - 115 KV, 1-45 KV 4) Gas Pipeline; Distance to nearest gas main 3.75 miles F. Transportation 1) Highway; Type of raod which services or is nearest to site primary (State Highway 155, State Highway 125 Distance to primary road - adjacent U.S. 4) 2) Railroad; Site serviced by rail - No Distance to active rail line 1.5 miles 0 TOWN: LEE A. Site - LE-2 B. Size - Approximately 410 acres C. Current Status 1) Existing Land Use: Forested Lands - 75% 2) Zoning Status: Medium Density Residential - 80% Open/Uncultivated - 10% Commercial - 20% Marshlands - 100% Extractive, Quarry, Sandpit - 5% D. Land and Water Resources 1) Land Capability: Excellent- 90% 2) Adjacent to surface fresh water Yes Fair 5% Distance on site (Oyster River, Turtle Pond) Poor 5% 3) Adjacent to Aquifer - Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup 1.25 miles What town(s) does this hookup serve - Durham 2) Distance to nearest sewer hookup - .75 miles What town(s) does this hookup serve - Durham 3) Utilities Available', Distance to nearest major transmission line -..4 miles Type of transmission line - 345 KV 4) Gas Pipeline; Distance to nearest gas main - 4.25 mile s F. Transportation 1) Highway; Type of road which services or is nearest to site primary (..State Highway 155, U.S. 4) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - No Distance to active rail line 1.5 miles TOWN; LEE A. Si te - LE-3 B. Size - Approximately 770 acres C. Current Status 1) Existing Land Use: Forested Lands - 85% 2) Zoning Status: Medium Density Residential 100% Agricultural - 10% Open/Uncultivated - 5% D. Land and Water Resources 1) Land Capability: Excellent 75/00 2) Adjacent to surface fresh water Yes Good 15% Distance on site (Lamprey River) Fair 5% Poor 5% 3) Adjacent to Aquifer Yes Distance on site E. Utilities and Services 1) Distance to nearest major water hookup 2.25 miles What town(s) does this hookup serve - Nevfinarket 2) Distance to nearest sewer hookup 2.0 miles What town(s),does.this hookup serve - Durham 3) Utilities Available; Distance to nearest-major transmission line 1.5 miles Type of transmission line - 115 KV, 345 KV 4) Gas Pipeline; Distance to nearest gas main 5.75 miles F. Transportation 1) Highway; Type of road which services or is nearest to site primary (State Highway 155) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - No Distance to active rail line 2.0 miles TOWN: LEE A. Site - LE-4 B. Size - Approximately 770 acres C. Current Status 1) 'Existing Land Use: Forested Lands 80% 2) Zoning Status:L Medium Density Residential 65% Open/Uncultivated 15% High Density Residential, 35% Agricultural 5% D. Land and Water Resources 1) Land Capability: Excellent - 95% 2) Adjacent to surface fresh water Yes Poor - 5% Distance - on site (Lamprey River) 3) Adjacent to Aquifer Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup .75 miles What town(s) does this hookup serve - Newmarket 2) Distance to nearest sewer hookup - 1.75 miles. What town(s) does this hookup serve - Newmarket 3) Utilities Available; Distance to nearest major transmission line adjacent Type of transmission line - 33 KV 4) Gas Pipeline; Distance to nearest gas main 6.75 miles F. Trans2ortation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 152) Distance to primary road - .7 miles (State Highway 155) 2) Railroad; Site serviced by rail - No Distance to active rail line 1.7 miles TOWN: LEE A. S J. te.- - LE-5 B. Size - Approximately 380 acres C. Current Status 1) Existing Land Use: Forested Lands - 80% 2) Ioning Status: Medium Density Residential - 60% Open/Uncultivated - 10% High Density Residential - 40% Agricultural - 10% D. Land and Water Resources 1) Land Capability: Excellent - 70% 2) Adjacent to surface fresh water Yes Good - 25% Distance on site (Lamprey River) Poor - 5% 3) Adjacent to Aquifer - No Distance - .25 miles E. Utilities and Services 1) Distance to nearest major-water hookup .75 miles What town(s) does this hookup serve - Newmarket 2) Distance to nearest sewer hookup - 2.5 miles What town(s) does this hookup serve - Newmarket 3) Utilities Available; Distance to nearest major transmission line .3 miles Type of transmission line - 33 KV 4) Gas Pipeline; Distance to nearest gas main - 6.5 miles F. Trans2ortation 1) Highway; Type;of road which services or is nearest to site - primary (State Highway 155) .,secondary (State Highway 152) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - No Distance to active rail line 2.9 miles TOWN: LEE A. Site - LE-6 B. Size - Approximately 380 acres Current Status 1) Existing Land Use: Forested Lands - 90% 2) Zoning Status: Medium Density Residential 100% Open/Uncultivated - 10% D. Land and Wa@er Resources 1) Land Capability: Good - 85% 2) Adjacent to surface fresh water Yes Fair - 15%. Distance on site (Little River) .3 miles (Wheelwright Pond) 3) Adjacent to Aquifer - Yes Distance on site E. Utilities and Services 1) Distance to nearest major water hookup 2.75 miles What town(s) does this hookup serve - Newmarket 2) Distance to nearest sewer hookup - 2.75 miles What town(s) does this hookup serve - Durham 3) Utilities Available; Distance to nearest major transmission line 1.8 miles Type of transmission line - 115 KV, 345 KV 4) Gas Pipeline; Distance to nearest gas main 6.75 miles F. Tran 1) Highway; Type of road which services or is nearest to site primary (State Highway 155) Distance to primary road - adjacent 2) Railroad; Site serviced by rail No Distance to active rail line 3.4 miles TOWN; LEE A. Site LE-7 B. Size - Approximately 230 acres C. Current Status 1) Existing Land Use: Forested Lands - 85% 2) Zoning Status: Medium Density Residential 100% Marshlands - 10% Open/Uncultivated 5% D. Land and Water Resources 1) Land Capability: Excellent - 70% 2) Adjacent to surface fresh water - Yes Good - 25% Distance adjacent (Wheelwright Pond, Caldwell Pond) Fair 5% 3) Adjacent to Aquifer Yes Distance - adjacent E. Utilities and Services 1) Distance to nearest major water hookup 3.75 miles What town(s) does this hookup serve - Durham 2) Distance to nearest sewer hookup 3.0 miles What town(s) does this hookup serve - Durham 3) Utilities Available; Distance to nearest major transmission line .7 miles Type of transmission line - 115 KV, 345 KV 4) Gas Pipeline; Distance to nearest gas main - 6.25 miles F. Transportation 1) Highway; Type of road which services or is nearest to site primary (State Highway 125) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - No Distance to active rail line 3.8 miles TQWN; LEE A. Si te - LE-8 B. Size - Approximately 440 acres C. Current Status 1) Existing Land Use: Forested Lands - 85% 2) Zoning Status: Medium Density Residential 100% Open/Uncultivated - 10% Extractive, Quarry, Sandpit - 5% D.7 Land and Water Resources 1) Land Capability: Excellent - 95% 2) Adjacent to surface fresh water Yes Fair - 5% Distance adjacent (Little River) 3) Adjacent to Aquifer Yes .4 miles (Lamprey River) Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup 2.5 miles What town(s) does this hookup serve - Newmarket 2) Distance to nearest sewer hookup - 3.75 miles What town(s) does this hookup serve - Durham 3) Utilities Available; Distance to nearest major transmission line 2.0 miles Type of transmission line - 33 KV 4) Gas Pipeline; Distance to nearest gas main - 7.75 miles F. Trans2ortation 1) Highway; Type of road which services or Is nearest to site primary (State Highway 125) secondary (State Highway 152) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - No Distance to active rail line - 3.9 miles TOWN: LEE A. Site LE-9 B. Size Approximately 490 Acres C. Current Status 1) Existing Land Use: Forested Lands - 85% 2) Zoning Status: Medium Density Residential 100% Open/Uncultivated - 10% Commercial - 5% @D. Land and Water Resources 1) Land Capability: Excellent - 45% 2) Adjacent to surface fresh water No Good - 500110 Distance .45 miles (North River) Fair - 5% .5 miles (Lamprey River) 3) Adjacent to Aquifer No Distance - .25 miles E. Utilities and Services 1) Distance to nearest major water hookup 2.0 miles What town(s) does this hookup serve - Newmarket 2) Distance to nearest sewer hookup - 3.75 miles What town(s) does this hookup serve - Newmarket 3) Utilities Available; Distance to nearest major transmission.line 1.2 miles Type of transmission line - 33 KV 4) G.ns Pipeline; Distance to nearest gas maiht,.- 7.5 miles F. 1) Highway; Type of road which services or is nearest to site primary (State Highway 125, State Highway 155) secondary (State Highway 152) - Distance to primary road - adjacent 2) Railroad; Site serviced by rail - No Distance to active rail line 3.5 miles TOWN: LEE A. Site LE-10 B. Size Approximately 230 acres C. Current Status 1) Existing Land Use: Forested Lands - 65% 2) Zoning Status: Medium Density Residential 160% Agricultural - 20% Extractive, Quarry, Sandpit - 10% Open/Uncultivated - 5% D. Land and Water Resources 1) Land Capability: Excellent - 85% 2) Adjacent to surface fresh water - Yes Poor - 15% Distance adjacent (Oyster River, Chelsey Brook) .3 miles (Lamprey River) 3) Adjacent to Aquifer Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup 1.75 miles What town(s) does this hookup serve - Durham 2) Distance to nearest sewer hookup - 1.0 mile What town(s) does this hookup serve - Durham 3) Utilities Available; Distance to nearest major transmission line 1.3 miles Type of transmission line -.33 KV 4) Gas Pipeline; Distance to nearest gas main 5.0 miles F. Transportation 1) Highway; Type of road which services or is nearest to site State Highway 155A Distance to primary road - .6 miles (State Highway 155) 2) Railroad; Site serviced by rail - No Distance to active rail line 1.5 miles TQWN: LEE A. Site - LE-11 B. Size - Approximately 460 acres C. Current Status 1) Existing Land Use: Forested Lands 85% 2) Zoning Status,. Medium Density Residential 100% Open/Uncultivated D. Land and Water Resources 1) Land Capability: Excellent 75% 2) Adjacent to surface fresh water Yes Good 15% Distance on site (North River) Fair 10% 3) Adjacent to Aquifer No Distance - .5 miles E. Utilities and Services 1) Distance to near@est major water hookup 2.5 miles What town(s) does this hookup serve - Epping 2) Distance to nearest sewer hookup - 2.5 miles What town(s) does this hookup serve - Epping 3) Utilities Available; Distance to nearest major transmission line 1.3 miles Type of transmission-line - 33 KV 4) Gas Pipeline; Distance to nearest gas main 7.5 miles F. Transportation 1) Highway; Type of road which services or Is nearest to site primary (State Highway 125) secondary (State Highway 152) Distance to primary road - adjacent 2)- Railroad; Site serviced by rail - No Distance to active rail line 3.4 miles. .75"@ 05 V A@ Phoebes N ablel@ Mtn. Pond *Town,- Middle 00 0 t Piper Mtn. @Pe@kins M m t n. L ity Pond m C, Rive,- 41, 3 ON 0 P PULATION 0 T 430 Middleton i Corners 00 0 k@' Mid-2 4 5unris L ohe LD TQWN; MIDDLETON A. Site - MID-I B. Size - Approximately 770 acres C. Current Status 1) Existing Land Use: Forested Lands 100% 2) Zoning Status: No Zoning D. Land and Water Resources 1) Land Capability: Excellent - 10% 2) Adjacent to surface fresh water Yes Good - 75% Distance on site (Jones Brook, Horn Brook) Poor 15% 3) Adjacent to Aquifer Yes Distance - adjacent E. Utilities and Services 1) Distance to nearest major water hookup 3.5 miles What town(s) does this hookup serve - Wakefield 2) Distance to nearest sewer hookup - 5.75 miles What town(s) does this hookup serve - Wolfeboro 3) Utilities Available; Distance to nearest major transmission line 5.5 miles Type of transmission line - 33 KV 4) Gas Pipelinet Distance to nearest gas main - 11.5 miles F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (town road) Distance to primary road - 2.25 miles (State Highway 16) 2) Railroad; Site serviced by rail - No Distance to active rail line -.2.4 miles TOWN: MIDDLETON. A. Site MID-2 B. Size - Approximately 1560 acres C. Cur,rent Status 1) Existing Land Use: Forested Lands 95% 2) Zoning Status: No Zoning Residential - less than 5% Marshlands - less than 5% D. Land and Water Resources 1) Land Capability: Excellent - 40% 2) Adjacent to surface fresh water Yes Good - 50% Distance on site (Moose Brook Poor - 10% .1 mile (Sunrise Lake) 3) Adjacent to Aquifer No Distance - .25 mile E. Utilities and Services 1) Distance to nearest major water hookup 2.25 miles What town(s) does this hookup serve - Farmington 2) Distance to nearest sewer hookup - 4.0 miles What town(s) does this hookup serve - Farmington 3) Utilities Available; Distance to nearest major transmission line 3.5 miles Type of transmission line - 33 KV -4) Gas Pipeline; Distance to nearest gas main 9.25 miles F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (town road) Distance to primary road -@ 3.0 miles (State Highway 16.) 2) Railroad; Site serviced by rail - No Distance to activerail line 2.7 miles TOWN; MIDDLETON A. Site MID-3 B. Size Approximately 330 acres C. Current Status 1) Existing Land Use: Forested Lands - 90% 2) Zoning Status: No Zoning Industrial - 5% Open/Uncultivated - 5% D. Land and Water Resources 1) Land Capability: Excellent.- 90% 2) Adjacent to surface fresh water Yes Fair 10% Distance on site (Jones Brook,. Moose Brook) .45 mile(Sunrise Lake) 3) Adjacent to Aquifer - No Distance 1.25 miles E. Utilities and Services 1) Distance to nearest major water hookup 2.75 miles What town(s) does this hookup serve - Farmington 2) Distance to nearest sewer hookup - 4.0 miles What town(s) does this hookup serve - Farmington 3) Utilities Available; Distance to nearest major transmission line 4.6 miles Type of transmission line - 33 KV 4) Gas Pipeline; Distance to nearest gas main 8.75 miles F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (town road) Distance to primary road - 1.75miles (State Highway 16) 2) Railroad; S ite serviced by rail - No Distance to active rail line 1.4 miles 'q f @yAAEFIELD Mi aroo* 4f- mi :@V Hoff :Z@ 0 0 0 SALM L9 0 1-4 *Town: 'Mi W V If 01 tb e,e S: 06 Al 0 TOWN: MILwN A. Site - MI-I B. Size - Approximately 260 acres C. Current Status 1) Existing Land Use: Forested Lands - 95% 2) Zoning Status: Single Zoning Residential - 5% D. Land and Water Resources 11 Land Capability: Excellent - 10% 2) Adjacent -to surface fresh water Yes Good - 90% Distance on site (Branch River) 3) Adjacent to Aquifer - Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup 2.8 miles .What town(s) does this hookup serve - Milton 2) Distance to nearest sewer hookup - 6.5 miles What town(s) does this hookup serve - Farmington 3) Utilities Available; Distance to nearest major transmission line 6.2 miles Type of transmission line 33 KV 4) Gas Pipeline; Distance to nearest gas main 9.25 mile.s F. Transportation 1) Highway; Type of road which services or is nearest to site - primary (State Highway 16) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - No Distance to active rail line .3 mile TOWN: MILTON A. Site - MI-2 B. Size - Approximately 1510 acres C. Current Status 1) Existing Land Use: Forested Lands - 90% .2) Zoning Status: Single Zoning Residential - 5% Open/Uncultivated - 5% D. Land and Water Resources 1) Land Capability: Excellent 30% 2) Adjacent to surface fresh water Yes Good 65% Distance.- on site (Branch River, Jones Brook) Fair 5% 3) Adjacent to Aquifer Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup 1.75 miles What town(s) does this hookup serve - Milton 2) Distance to nearest sewer hookup - 5.0 miles What town(s) does this hookup serve - Farmington 3) Utilities Available; Distance to nearest major transmission line 4.9 miles Type of transmission line .6 33 KV 4) Gas Pipeline; Distance to nearest gas main 8.0 miles F. Transportation 1) Highway; Type of read which services or is nearest to site primary (State Highway 16) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - Yes Distance to active rail line on site TOWN: MILTON A. Site MI-3 B. Size - Approximately 510 acres C. Current Status 1) Existing Land Use: Forested Lands - 90% 2) Zoning Status: Single Zoning Residential - 5% Marshlands - 5% D. Land and Water Resources 1) Land Capability: Excellent - 70% 2) Adjacent to surface fresh water Yes Good - 20% Distance - on site (Branch River) Poor - 10% 3) Adjacent to Aquifer- Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup 1.75 miles What town(s) does this hookup serve - Milton 2) Distance to nearest sewer hookup - 6.0 miles What town(s) does this hookup serve - Farmington 3) Utilities Available; Distance to nearest major transmission line 5.2 miles Type of transmission line - 33 KV 4) Gas Pipeline; Distance -I#l-o nearest gas main - 8.25 miles F. Transportation 1) Highway; Type of road which services or is nearest to site - primary (State Highway 16) Distance to primary road - adjacent, 2) Railroad; Site serviced by rail - No Distance to active rail line .5 mile TOWN: MILTON A. Site MI-4 B. Size - Approximately 610 acres C. Current Status 1) Existing Land Use: Forested Lands - 95% 2) Zoning Status: Single Zoning Open/Uncultivated - 5% D. Land and Water Resources 1) Land Capability: Good - 85% 2) Adjacent to surface fresh water Yes Fair - 5% Distance adjacent (Branch River, Salmon Falls River) Poor - 10% 3) Adjacent to Aquifer - No Distance - .25 mile E. Utilities and Services' 1) Distance to nearest major water hookup .5 mile What town(s) does this.hookup serve - Milton 2)..Distance to nearest sewer hookup - 5.25 miles What town(s) does this hookup serve,- Farmington 3) Utilities Available; Distance to nearest major transmission line 3.8 miles. Type of transmission line - 33 KV 4) Gas Pipeline; Distance to nearest gas main 7.0 miles F. Transportation 1) Highway; Type of road which services or is nearest to site primary (State Highway 16) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - No Distance to active rail line .4 mile TOWN: MILTON A. Site MI-5 B. Size Approximately 1280 acres C. Current Status 1) Existing Land Use: Forested Lands - 85%-, 2) Zoning Status: Single Zoning Open/Uncultivated - 10% Residential - 5% D. Land and Water Resources 1) Land Capability: Excellent.- 10% 2) Adjacent to surface fresh water Yes Good - 80% Distance adjacent (Town House Pond, Lyman Brook) Fair - 10% 3) Adjacent to Aquifer No Distance .25 mile E4 Utilities and Services 1) Distance to nearest major water hookup on site What town(s) does this hookup serve Milton 2) Distance to nearest sewer hookup - 2.75 miles, What town(s) does this hookup serve - Farmington 3) Utilities Available; Distance to.nearest major transmission line 1.2-miles Type of transmission line - 33 KV 4) Gas Pipeline; Distance to nearest gas main 4.25 miles F. Transportation 1) Highway; Type of road which services or is nearest to site primary (State Highway 16) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - Yes Distance to active rail line ofi-site TOWN: MILTQN A. Site - MI-6 B. Size - Approximately 670 acres C. Current Status 1) Existing Land Use: Forested Lands - 90% 2) Zoning Status: Single Zoning Open/Uncultivated - 10% 0. Land and Water Resources 1) Land Capability: Excellent - 65% 2) Adjacent to surface fresh water Yes Good - 25% Distance on site (Dames Brook) Fair - 10% .05 mile (Cocheco River) 3.) Adjacent to Aquifer - No Distance - 1.25 miles E. Utilities and Services 1) Distance to nearest major water hookup adjacent Whattown(s) does this hookup serve - Farmington 2) Distance to nearest sewer hookup - 1.5 miles What town(s) does this hookup serve - Farmington 3) Utilities Available; Distance to nearest major transmission line 1.8 miles Type of transmission line - 33 KV 4) Gas Pipeline; Distance to nearest gas main 6.75 miles Transportation 1) Highway; Type of road which services or is nearest to site secondary (town road) Distance to primary road - 2.0 miles (State Highway 11) 2) Railroad; Site serviced by rail - No Distance to active rail line 2.7 miles TOWN: MILTON A. Site MI--7 B. Size Approximately 360 acres C. Current Status 1) Existing Land Use: Forested Lands - 90% 2) Zoning Status: Single Zoning Open/Uncultivated - 5% Residential - 5% D. Land and Water Resources 1) Land Capability: Good - 80% 2) Adjacent to surface fresh water Yes Fair - 10% Distance on site (Jones Brook) Poor - 10% .35 mile (Town House Pond). 3) Adjacent to Aquifer - No - Distance - .75 mile E. Utilities and Services 1) Distance to nearest major water hookup .3 mile What town(s) does this hookup serve - Milton 2) Distance to nearest sewer hookup - 4.25 miles What town(s) does this hookup serve - Farmington 3) Utilities Available; Distance to nearest major transmission line 3.7 miles Type of transmission line - 33 KV 4) Gas Pipeline; Distance to nearest gas main 6.75 miles F. Transportation 1) Highway; Type of road which services or is nearest to site primary (State Highway 16) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - Yes Distance to active rail line on site TOWN, MILTON A. Site - MI-3 B. Size - Approximately 410 acres C. Current Status 1) Existing Land Use: Forested Lands 100% 2) Zoning Status: Single Zoning D. Land and Water Resources 1) Land Capability: Good - 80/00 2) Adjacent to surface fresh water Yes Fair - 15% Distance on site (Lyman Brook) Poor - 5% .05 mile (Salmon Falls River, Spaulding Pond' 3) Adjacent to Aquifer - No Distance 1.75 miles E. Utilities and Services 1) Distance to nearest maJor water hookup adjacent What town(s) does'this hookup serve - Milton 2 Distance to nearest sewer hookup - 2.5 miles What town(s) does this hookup serve - Farmington 3) Utilities Available; Distance to nearest major-transmission line adjacent Type of transmission line 33 KV 4) Gas Pipeline; Distance to nearest gas main 3.0 miles F. Transportation 1) Highway; Type of road which services or is nearest to site primary (State Highway 16) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - Yes Distance to active!rail line on site 1Mt Bet mt. je pr L A K *Town: New Durh to -@-,4 6 OD U1 41 tj K.H. FISH rn , RE4141"3 POOLS f- 7 EXP CASS POOLS :K TWO IF z Mt. Eleanor pp 011, 4fofchs pnd Rottlesnoke z Mtn. 0 BIRCH HILL P -A Cc) 3'.. D Coburn P, Pond R coldrain A Ned-1 4, 0 3 FISH a SAME % CLUB 40 N Ne ell (No too 01 ts 0 Ne J 3 0 Or -Z it 4v G 41 it no, AV 40? 0 91 V14- TOWN: NEW DURHAM 3NOZ IVISViij A. Site NED-1 B. Size Approximately 1050 acres C. Current Status .1) Existing Land Use: Forested Lands - 75% 2) Zoning Status: No Zoning Residential - 10% Water Areas - Im"'I Open/Uncultivated - 5% D. Land and Water Resources 1), Land Capability: Excellent - 35% 2) Adjacent to surface fresh water Yes Good - 40% Distance on site (Merrymeeting River) Poor - 10% .15 mile (Coldrain Pond) Existing Urban - 15% .1 mile (Club Pond) 3) Adjacent to Aquifer - Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup 1.75 miles What town(s) does this hookup serve - Alton Distance to nearest sewer hookup - 4.75 miles What town(s) does this 1hookupserve - Farmington 3) Utilities Available; Distance to nearest major transmission line on site Type V transrriission line - 33 KV 4) Gas Pipeline; Distance to nearest gas main 10.75 miles F. Transportation 1) Highway; Type of road which services or is nearest to site primary (State Highway 11) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - No Distance to active rail line 5.5 miles TOWN: NEW DURHAM, A. Site NED-2 B. Size - Approximately 740 acres C. Current Status 1) Existing Land Use: Forested Lands - 90% 2) Zoning Status: No Zoning Marshlands - 10% D. Land and Water Resources .1) Land Capability: Excellent - 10% 2) Adjacent to surface fresh water Yes .Good - 65% Distance on site (Ela River) Fair - 5% .25 mile (Club Pond) Poor - 20% 3) Adjacent to Aquifer Yes Distance on site E. Utilities and Services 1) Distance to nearest major water hookup 2.5 miles What town(s) does,this hookup serve - Farmington 2) Distance to nearest sewer hookup - 3.0 miles What town(s) does this hookup serve.- Farmington 3) Utilities Available; Distance to nearest major transmission line - on site Type of transmission line - 33 KV 4) Gas Pipeline; Distance to nearest gas main 9.0 miles F. Transportation 1) Highway; Type of road which services or is nearest to site.- primary (State Highway 11) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - No Distance to active rail line 3.8 miles TOWN: NEW DURHAM A. Site NED-3 B. Size Approximately 510 acres C. Current Status 1) Existing Land Use: Forested Lands - 90% 2) Zoning Status: No Zoning Open/Uncultivated - 5% Marshlands - 5% D. Land and Water Resources 1) Land Capability: Excellent - 95% 2) Adjacent to surface fresh water Yes Poor - '5% Distance adjacent (Ela River) .5 mile'.(Merrymeeting River) 3) Adjacent to Aquifer - Yes Di_s.tance - on site E. Utilities and Services 1) Distance to nearest major water hookup 2.5 miles What town(s) does this hookup serve - Alton 2) Distance to nearest sewer hookup - 3.5 miles What town(s) does this hookup serve - Farmington 3) Utilities Available; Distance to nearest major transmission line .1 mile Type of transmission line - 33 KV 4) Gas Pipeline; Distance to nearest gas main 9.5 miles F. Transportation 1) Highway; Type of road which services or is nearest to site primary (State Highway 11) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - No Distance to active rail line 4.2 miles KINGSTON I Z, V3 Ne Town: Newt 4u MI: Rowes 6 @a@ Cor 13 "o New. X" Zn.", e, -XQ 40 00 4 C7 17 77 MW TOWN: NEWTON A. Site - NE-I B. Size - Approximately 540 acres C. Current Status 1) Existing Land Use: Forested lands - 85% 2) Zoning Status: High Density Residential - 95% Residential - 5% Commercial - 5% Open/Uncultivated - 5% Extractive, Quarry, Sandpit - 5% D. Land and Water Resources 1) Land Capability: Excellent 90% 2) Adjacent to surface fresh water No Fair 5% Distance .25,miles (Tuxbury Pond) Poor 5% 3) Adjacent to Aquifer Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup 4.5 miles What town(s) does this hookup'serve - Seabrook 2) Distance'to nearest sewer hookup - 6.25 miles What town(s) does this hookup serve - Exeter 3) Utilities Available; Distance to nearest major transmission line 3.0 miles Type of transmission line - 33 KV - 4) Gas Pipeline; Distance to nearest gas main .25 miles F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 108) Distance to primary road - 2.75 miles (State Highway 125), 2) Railroad; Site serviced by rail - No Distance to active rail line 1.5 miles TOWN: NEWTON A. Site - NE-2 B. Size - Approximately 250 acres C. Current Status 1) Existing Land Use: Forested Lands - 50% 2) Zoning Status: High Density Residential - 85% Agricultural - 35% Commercial. - 15% Residential - 10% Open/Uncultivated - 5% D. Land and Water Resources 1) Land Capability: Excellent 100% 2) Adjacent to surface fresh water - No Distance .7 miles (Little River) 3) Adjacent to Aquifer No Distance - .5 miles E. Utilities and -cervices 1) Distance to nearest major water hookup 6.25 miles What tcwn(s) does this hookup serve - Seabrook 2) Distance to nearest sewer hookup - 7.5 miles What town(s) does this hookup serve - Exeter 3) Utilities Available; Distance to nearest major transmission line 2.7 mil6s Type of transmission line -.33 KV 4) Gas Pipeline; Distance to nearest gas main - adjacent F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 108) Distance to primary road - 2.25 miles (State Highway 125) 2) Railroad; Site serviced by rail - No Distance to active rail line 1.3 miles, TOWN; NEWTON Site NE-3 B. Size - Approximately 540 acres C.. Current Status 1) Existing Land Use: Forested Lands - 90% 2) Zoning Status: High Density Residential 00% Open/Uncultivated - 5% Mars hl and s - 5% D. Land and Water Resources 1) Land Capability: Excellent - 90% 2) Adjacent to surface fresh water Yes Poor - 10% Distance adjacent (Little River) 3) Adjacent to Aquifer - No Distance - .25 miles E. Utilities and Services 1) Distance to nearest major water hookup 6.5 miles What town(s) does this hookup serve " Salem 2) Distance to nearest sewer hookup - 8 0 miles What town(s) does this hookup serve Salem 3) Utilities Available; Distance to nearest major transmission line 1.4 miles Type of transmission line - 33 KV- - 4) Gas Pipeline;.Distance to nearest gas main on site F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 108) Distance to primary road - 1.1 miles (State Highway 125) 2) Railroad; Site serviced by rail - No Distance to active rail line .3 miles TOWN: NEW ON M A. Site NE-4 B. Size Approximately 360 acres C. Current Status 1) Existing Land Use: Forested Lands 95% 2) Zoning Status: High Density Residential - 90% Residential 5%. Commercial - 10% D. Land and Water Resources 1) Land Capability: Excellent 90% 2) Adjacent to surface fresh water " Yes. Poor 10% Distance adjacent (Little River) 3) Adjacent to Aquifer No Distance .5 miles E. Utilities and Services 1) Distance to nearest major water hookup 6.5 miles What town(s) does this hookup serve - Seabrook 2) Distance to nearest sewer hookup 7 7.5 miles What town(s) does this hookup serve - Exeter 3) Utilities Available: Distance to nearest major transmission line 1.8 miles Type of transmission line - 33 KV 4) Gas Pipeline; Distance to nearest gas main on site F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 108). Distance to primary road - 1.25 miles (State Highway 125) 2) Railroad; Site serviced by rail - No Distance to active rail line .3 miles TOWN: NEWTON A. Site - NE-5 B. Size - Approximately 720 acres C. Current Status 1) Existing Land Use: Forested Lands - 90% 2) Zoning Status: High Density Residential 95% Residential - 10% Commercial 0. Land and Water Resources 1) Land Capability: Excellent - 65% 2) Adjacent to surface fresh water No Good - 25% Distance .3 miles (Country Pond) Poor - 10% 3) Adjacent to Aquifer - Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup 5.75 miles What town(s) does this hookup serve - Seabrook 2) Distance to nearest sewer hookup - 6.25 miles What town(s) does this hookup serve - Exeter 3) Utilities Available; Distance to nearest major transmission line 1.5 miles Type of -transmission line - 33 KV 4) Gas Pipeline; Distance to nearest gas main on site F. Transportation 1) Highway; Type ofroad which services or is nearest to site secondary (State Highway 108) Distance to primary road - 1.5 miles (State Highway 125) 2) Railroad; Site serviced by rail - Yes Distance to active rail line adjacent 'r777- -. -'e"t a Jl;@ *Town: Northwood d" to?* ca 4 44 Long Pond VA 6 OU3 e LilIle 00w Du in Pond Pond 0 A Northwood 0, A Nor -1 0 Narrows 10 T. 'D (IT f FAP@ enne _3 tt hill 4 202 '9 '9 A7 Northwo ter] ad o Center 8/001f 7_@F_q Ook Hill @\ -k' Nor hwood Ridge Nor-3 202 6 4, Nor- 2 cat 7 LoRe 7 A 9 N 0 N 0@8 V. PUL TION @17 1526 4-4%N rthw ad a 4 OF Gulf Hill No," 0 goal Saddlebock mr F, Pond 7.- NO 5 /Z 3WILiS ftnof 2 "I'A i F TOWN: NORTHWOOD A. Site NOR-1 B. Size - Approximately 1330 acres C. Current Status 1) Existing Land Use: Forested Lands - 90% 2) Zoning Status:. Single Zoning Open/Uncultivated - 5% Water Areas - 5% D. Land and Water Resources 1) Land Capability: Excellent - 60% 2) AdJacent to surface fresh water Yes Good - 35% Distance - on site (Long Pond, Little Bow Pond, Fair - 5% Sherburne Brook) adjacent (Bow Lake, Harvey Lake, Kelsey Brook) 3) Adjacent to Aquifer - No Distance - 1.75 miles E. Utilities and Services T) Distance to nearest major water hookup 3.75 miles What town(s) does this hookup serve - Epsom .2) Distance to nearest sewer hookup - 11.0 miles What town(s) does this hookup serve - Rochester 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line - 33 KV 4) Gas Pipeline; Distance to nearest gas main 11.25 miles F. Trans2ortation 1) Highway; Type of road which services or is nearest to site primary (U.S. 4, U.S. 202, State Highway 9) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - No Distance to active rail line 11.3 miles TOWN: NORTHWOOD A. Site NOR-2 B. Size Approximately 2560 acres C. Current Status 1) Existing Land Use: Forested Lands, 75% 2) Zoning Status: Single Zoning Open/Uncultivated.- 10% Water Areas - 5% Residential - less than 5% Marshlands - less than 5% Agriculture - less than 5% Industrial less than 5% D. Land and Water Resources 1) Land Capability: Excellent - 30% 2) Adjacent to surface fresh water Yes Good - 60% Distance on site (Harvey Lake, Lamprey River) Fair - 5% Poor - 5% 3) Adjacent to Aquifer - No Distance - 1.0 mile E. Utilities and Services 1) Distance to nearest major water hookup 3.75 miles What town(s) does this hookup serve Epsom @2) Distance to nearest sewer hookup----9.75 miles What town(s) does this hookup serve - Rochester 3) Utilities Available; Distance to nearest major transmission line .1 mile Type of transmission line - 33 KV 4) Gas Pipeline; Distance to nearest gas main 10.25 miles F. Transportation 1) Highway; Type of road which services or is nearest to site primary (U.S. 4, U.S. 202, State Highway 9) Distance to primary road - adjacent 21J Railroad; Site serviced by rail - No Distance to active rail line - 10.1 miles TOWN#- NORTlit-400D A. Site NOR-3 B. Size - Approximately 870 acres C. Current Status 1) Existing Land Use: Forested Lands - 80% 2) Zoning Status: Single Zoning Open/Uncultivated - 10% Water Areas - 5% Industrial - less than 5% Marshlands - less than 5% D. Land and Water Resources 1) Land Capability: Excellent - 70% 2) Adjacent to surface fresh water No Good - 25% Distance .5 miles (Harvey Lake) Fair - 5% 1.0 miles (North River Pond) 3) Adjacent to Aquifer - No Distance - 2.75 miles E. Utilities and Services 1) Distance to nearest major water hookup 5.25 miles What town(s) does this hookup serve - Epsom 21 Distance to nearest sewer hookup - 9.0 miles What town(s) does this hookup serve - Rochester 3) Utilities Available; Distance to nearest major transmission line on site Type.--.of transmission line - 33 KV 4) Gas Pipeline; Distance to nearest gas main 9.5 miles Transportation 1) Highway; Type of road which services or is nearest to site primary (U.S. 4, U.S. 202, State Highway 9) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - No Distance to active rail line 9.8 miles TOWN#- NORTHWOOP A. Site NOR-4 B. Size Approximately 460 acres C. Current Status 1) Existing Land Use: Forested Lands - 90% 2) Zoning Status: Single Zoning Open/Uncultivated - 5% Water Areas - 5% D. Land and Water Resources 1) Land Capability: Excellent - 5% 2) Adjacent to surface fresh water No Good -85% Distance .1 mile @North River) Fair -10% .15 mile kLucas Pond) 3) Adjacent to Aquifer - No Distance - 3.25 miles E. Utilities and Services 1) Distance to nearest major water hookup 6.25 miles What town(s) does this hookup serve Epsom 2) Distance to nearest sewer hookup - 10.25 miles What town(s) does this-hookup serve - Rochester 3) Utilities Available; Distance to nearest major transmission line .6 mile Type of transmission line - 345 KV 4) Gas Pipeline; Distance to nearest gas main 10.75 miles F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 43) Distance to primary road - .6 miles (U.S. 4) 2) Railroad; Site serviced by rail - No Distance to active rail line 9.5 miles TOWN: NORTHWOOD A. Site NOR-5 B. Size Approximately 260 acres C. Current Status 1) Existing Land Use: Forested Lands - 90% 2) Zoning Status: Single Zoning Marshlands - 10% D. Land and Water Resources Land Capability: Excellent - 65% 2) Adjacent to surface fresh water Yes Good - 30% Distance adjacent (Lucas Pond) Fair - 5% 3) Adjacent to Aquifer No Distance - 3.5 miles E. Utilities and Services 1) Distance to nearest major water hookup 6.25 miles What town(s) does this hookup serve - Epsom 2) Distance to nearest sewer hookup - 10.0 miles What town(s) does this hookup serve - Epping 3) Utilities Available; Distance to nearest major transmission line .8 miles Type of transmission 'fine - 345 KV 4) Gas Pipeline; Distance to nearest gas main 11.25 miles F. Transportation- 1) Highway; Type of road which services or is nearest to site - secondary (State Hiqhway 43) Distance to primary road - 1.2 miles (U.S. 4) 2) Railroad; Site serviced by rail - No Distance to active rail line 9.0 miles 0 N 3 0 ell 6 'A's N o- 4 2.3 N NN Lake 4 061cltfing@ll, N vo - th T, )jo,.i ngnam *T own: Nottin 0 No No- Mulligan P0,701.5 No-6 0 No WGHAN 0 P017d L angley Pona 0-1 c Waters 0 4ake 0 A, No M N N 1OG 70 STEV POPULAT Notting am* 3 Nottingham. SMITH S quare FORES k@AWAK_ ... ....... 7 r G AM 0 13 t 7 77 7T@7 TOWN: NOTTINGHAM A. Site - NO-1 Ba Size - Approximately 230 acres C. Current Status 1) Existing Land Use: Forested Lands 80% 2) Zoning Status: Medium Density Residential 100% Water Area 10% Marshlands 10% D. Land and Water Resources 1) Land Capability: Good - 100% 2) Adjacent to surface fresh water Yes Distance on site (Kenison Pond) 3) Adjacent to Aquifer No Distance- 3.5 miles E. Utilities and Services 1) Distance to nearest major water hookup 7.75 miles What town(s) does this hookup serve - Raymond 2), Distance to nearest sewer hookup - 8.25 miles What town(s) does this hookup serve - Epping 3) Utilities Available; Distance to nearest major:transmission line .3 miles Type of transmission line - 345 KV 4) Gas Pipeline; Distance to nearest gas main 10.75 miles F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 152) Distance to primary road - 1.2 miles (U.S. 4) 2) Railroad; Site serviced by rail - No Distance to active rail line 8.3 miles TOWN: NOTTINGHAM A. Site NO-2 B. Size Approximately 460 acres C. Current Status 1) Existing Land Use: Forested Lands 75% 2) Zoning Status: Medium Density Residential.- 100% Open/Uncultivated - 15% Marshlands - 10% D. Land and Water Resources 1) Land Capability: Good - 100% 2) Adjacent to surface fresh water Yes Distance on site (North River) 3) Adjacent to Aquifer No Distance - 3.5 miles E. Utilities and Services 1) Distance to nearest major water hookup 8.0 miles What town(s) does this hookup serve Epsom or Raymond 2) Distance to nearest sewer hookup - 8.25 miles What town(s) does this hookup serve - Epping 3) Utilities Availabl.e; Distance to nearest major transmission line .2 miles Type of transmission line - 345 KV 4) Gas Pipeline; Distance to nearest gas main 10.0 miles F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 152) Distance to primary road - .5 miles (U.S. 4) 2) Railroad; Site serviced by rail - No Distance to active rail line 8.8 miles TQWN; NOTTINGHAM A. Si te NO-3 B. Size Approximately 230 acres C. Current Status 1) Existing Land Use: Forested Lands - 85% 2) Zoning Status: Medium Density Residential 100% Open/Uncultivated - 15% D. Land and Water Resources 1) Land Capability: Good - 95110 2) Adjacent to surface fresh water - Yes Fair - 5% Distance adjacent (North River) .15 miles (North River Pond) 3) Adjacent to Aquifer No Distance - 4.0 miles E. Utilities and Services 1) Distance to nearest major water hookup 8.25 miles What town(s) does this hookup serve - Epsom 2) Distance to nearest sewer hookup 8.75 miles What town(s) does this hookup serve - Rochester 3) Utilities Available; Distance to nearest major transmission line .4 miles Type of transmission line - 345 KV 4) Gas Pipeline; Distance to nearest gas main 9.25 miles F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 152) primary (U.S. 4) Distance to primary road - on site 2) Railroad; Site serviced by rail - No Distance to active rail line 9.7 miles TOWN. NOTTINGHAM A. Site NO-4 B. Size - Approximately 740 acres C. Current Status 1) Existing Land Use: Forested Lands - 85% 2) Zoning Status: Medium Density Residential 100% Open/Uncultivated - 10% Marshlands - 5% D. Land and Water Resources 1) Land Capability: Good - 90/0 2) Adjacent to surface fresh water - Yes F i Distance adjacent (Tributary of Little River) air - 5%- Poor - 5% 1.0 mile (Mendums Pond) 1.0 mile (North River Pond) 3) Adjacent to Aquifer No Distance - 2.0 miles E. Utilities and Services 1) Distance to nearest major water hookup 7.75 miles What town(s) does this hookup serve - Durham or Newmarket 2) Distance to nearest sewer hookup - 7.25 miles What town(s) does this hookup serve - Durham 3) Utilities Available; Distance to nearest majortransmission line 1.0 mile Type of transmission line - 115 KV 4) Gas Pipeline; Distance to nearest gas main.- 8.75 miles F. Trans2ortation 1) Highway; Type of road which services or Is nearest to site primary (U.S. 4) Distance to primary road on site 2) Railroad; Site serviced by rail - No Distance to active rail line 8.0 miles NOTTINGHAM TOWN: A. Site NO-5 B. Size Approximately 380 acres C. Current Status 1) Existing Land Use: Forested Lands - 85% 2) Zoning Status: Medium Density Residential 100% Marshlands - 10% Open/Uncultivated - 5% D. Land and Water Resources 1) Land Capability: Good - 90% 2) Adjacent to surface fresh water Yes Poor - 10% Distance on site (Tributaries of Little River) .1 mile (Mendums Pond) 3) Adjacent to Aquifer - No Distance - 1.25 miles E. Utilities and Services 1) Distance to nearest major water hookup 7.0 miles What town(s.), does this hookup serve - Durham or Newmarket 2) Distance to nearest sewer hookup - 6.25 miles What town(s) does this hookup serve - Durham 3) Utilities Available; Distance to nearest major transmission line .5 miles Type of-transmission-line---1-15 KV 4) Gas Pipeline; Distance to nearest gas main 8.75 miles F. Transportation 1) Highway; Type of road which services or is nearest to site primary (U.S. 4) Distance to primary road - on site 2) Railroad; Site serviced by rail - No Distance to active rail line 7.2 miles TOWN: NOTTINGHAM A. Site NO-6 B. Size Approximately 770 acres C. Current Status Existing Land Use: Forested Lands - 90% 2) Zoning Status: Medium Density Residential 100% Marshlands - 5% Open/Uncultivated - 5% D. Land and Water Resources 1) Land Capability: Good 100% 2) Adjacent to surface fresh water Yes Distance on site (Cyprus Pond, Little River) .35 miles (Mendums Pond) 3) Adjacent to Aquifer No Distance - .5 miles E. Utilities and Services 1) Distance to nearest major water hookup 6.5 miles What town(s) does this hookup serve - Epping or Newmarket ,2) Distance to nearest sewer hookup - 6.0 miles What town(s) does this hookup s,erve - Durham 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line - 115 KV, 345 KV 4) Gas Pipeline; Distance to nearest gas main 8.75 miles F. Transportation 1) Highway; Type of road which services or is nearest to site primary (U.S. 4) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - No Distance to active rail line 6.9 miles TOWN: NOTTINGHAM A. Site - NO-7 B. Size - Approximately 310 acres C. Current Status .1) Existing Land Use: Forested Lands 100% 2) Zoning Status: Medium Density Residential 100%, D. Land and Water Resources 1) Land Capability: Good - 75% 2) Adjacent to surface fresh water - Yes Fair - 15% Distance on.site (Little River) Poor - 10% .6 miles (Mendums Pond) 3) Adjacent to Aquifer - Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup 5.5 miles What town(s) does this hookup serve - Newmarket 2) Distance to nearest sewer hookup - 5.5 miles What town(s) does this hookup serve - Durham 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line - 115 KV, 345 KV 4) Gas Pipeline;-Distance to nearest-gas main 8.5 miles F. Transportation 1) Highway; Type of road which services or is nearest to site primary (U.S. 4) Distance to primary road adjacent 2) Railroad; Site serviced by rail - No Distance to active rail line 6.3 miles TOWN: NOTTINGHAM A. Site - NO-8 B. Size - Approximately 540 acres C. Current Status 1) Existing Land Use: Forested Lands 100% 2) Zoning Status: Medium Density Residential 100% D. Land and Water Resources 1) Land Capability'. Excellent - 10% 2) Adjacent to surface fresh water - Yes Good - 75% Distance on site (Little River) Fair - 5% Poor - 10% 3) Adjacent to Aquifer Yes Distance - On site E. Utilities and Services 1) Distance to nearest major water hookup 4.75 miles What town(s) does this hookup serve - Newmarket- 2) Distance to nearest sewer hookup - 4.5 miles What town(s) does this hookup serve - Durham 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line 345 KV 4) Gas Pipeline; Distance to nearest gas main - 7.5 miles F. Transportation 1) Highway; Type of road which services or is.nearest to site - primary (U.S. 4) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - No Distance to active rail line 5.2 miles TOWN; NOTTINGHAM A. Site NO-9 B, Size Approximately 770 acres C. Current Status 1) Existing Land Use: Forested Lands - 75% 2) Zoning Status: Medium Density Residential 100% Open/Uncultivated - 15% 0 Residential - 5% Marshlands - 5% D. Land and Water Resources 1) Land Capability: Excellent - 35% 2) Adjacent to surface fresh water Yes Good - 40% Distance on site (North River) Poor - 25% 3) Adjacent to Aquifer Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup 3.5 miles What town(s) does this hookup serve - Epping 2) Distance to nearest sewer hookup - 3.5 miles What town(s) does this hookup serve - Epping 3) Utilities Available; Distance to nearest -major transmission line 1.9 miles Type of transmission line - 345 KV 4) Gas Pipeline; Distance to nearest gas main 9.0 miles F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 152) Distance to primary road - .5 miles (State Highway 125) 2) Railroad; Site serviced by rail - No Distance to active rail line 4.6 miles TOWN: NOTTINGHAM A.. Site NO-10 B. SiZe Approxim&tely 410 acres C. Current Status 1) Existing Land Use: Forested Lands - 95% 2) Zoning Status: Medium Density Residential 100% Open/Uncultivated - 5% D. Land and Water Resources Land'Capability: Excellent - 55% 2) Adjacent to surface fresh water Yes Good - 25% Distance on site (North River) Fair - 15% Poor - 5% 3). Adjacent to Aquifer Yes Distance - adjacent E. Utilities and cervices 1) Distance to nearest major water hookup 4.75 miles -his hookup serve - Epping What town(s) does 41. 2) Distance to nearest sewer hookup - 5.0 miles What town(s) does this hookup serve - Epping 3) Utilities Available; Distance to nearest-maJor transmission line 1.3 miles Type of transmission line - 345 KV 4) Gas Pipeline; Distance to nearest gas ma"In 10.25 miles F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 152) Distance to primary road - 2.25 miles (U.S. 4 or State Highway 125) 2) Railroad; Site serviced by rail - No Distance to active rail line 5.9 miles TOWN: NOTTINGHAM A. Site - NO-11 7V1 B. Size - Approximately 770 acres C. Current Status .1) Existing Land Use: Forested Lands 95% 2) Zoning Status: Medium Density Residential 100% Open/Uncultivated 5% D. Land and Water Resources 1) Land Capability: Excellent - 50% 2) Adjacent to surface fresh water No Good - 35% Distance -.1 mile (North River) Fair - 5% Poor - 10% 3) Adjacent to Aquifer No Distance - .75 miles E. Utilities and Services 1) Distance to nearest major water hookup 5.5 miles What town(s) does this hookup serve - Epping 2) Distance to nearest sewer hookup - 5.75 miles What town(s) does this hookup serve - Epping 3.) Utilities Available; Distance to nearest major transmission line on site Type-of transmission line - 345 KV 4) Gas Pipeline; Distance to nearest qas main 10.25 miles F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 152) Distance to primary road - 1.5 miles (U.S. 4) 2) Railroad; Site serviced by rail - No Distance to active rail line 6.7 miles TOWN: NOTTINGHAM A. Site NO-12 B. Size - Approximately 1790 acres C. Current Status 1) Existing Land Use: Forested Lands - 95% 2) Zoning Statust Medium Density Residential 90% Marshlands - 5% High Density Residential -'10% D. Land and Water Resources 1) Land Capability: Excellent - 20% 2) Adjacent to surface fresh water - Yes Good - 65% Distance on site (Bean River, North River) Fair - 10% adjacent (Pawtuckaway Pond) Poor - 5% 3) Adjacent to Aquifer No Distance - .5 miles ,E. Uti-lities and Services 1) Distance to nearest major water hookup 4.25 miles What town(s) does this hookup serve - Raymond 2) Distance to nearest sewer hookup - 5.0 miles What town(s) does this hookup serve - Epping 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line - 345 KV 41 Gas Pipeline; Distance to nearest gas main 11.0 miles F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 152) Distance to primary road - 2.0 miles (U.S. 4) 2) Railroad;-Site serviced by rail - No Distance to active rail line 5.0 miles TOWN: NOTTINGHAM A. Site NO-13 B. Size Approximately.690 acres C. Current Status 1) Existing Land Use: Forested Lands - 85% 2) Zoning Status: Medium Density Residential 100% Open/Uncultivated - 10% Marshlands - 5% D. Land and Water Resources 1) Land Capability: Good - 90% 2) Adjacent to surface fresh water - No Poor - 10% Distance .65 miles (Pawtuckaway Pond) 3) Adjacent to Aquifer - No Distance - .25 miles E. Utilities and Services 1) Distance to nearest major water hookLIP -,2.25 miles What town(s) does this hookup serve - Epping 2) Distance to nearest sewer hookup - 2.5 miles What town(s) does this.hookup serve - Epping .3) Utilities Available; Distance to nearest major transmission line 2.8 miles lype of transmission line - 345 KV 4) Gas Pipeline; Distance to nearest gas main - 9.0 miles F. Transp ortation 1) Highway; Type of road which services or is nearest to site State Highway 156 Distance to primary road - 2.25 miles (State Highway 125) 2) Railroad; Site serviced by rail - No Distance to active rail line 3.5 miles . . . . . . . . . . Y *Town: Plaisto PI_ 2 jve@, 7 f TOW'- @PL pool t7 I fs \V/ co log SCALE 1/31680 TOWN: PLAISTOW A. Site PL--1 B. Size Approximately 540 acres C. Current Status 1) Existing Land Use: Forested Lands 95% 2) Zoning Status: High Density Residential 95% Extractive, Quarry, Commercial 5% Sandpit 5% D. Land and Water Resources 1) Land Capability: Excellent - 40% 2) Adjacent to surface fresh water No Good - 50% Distance .4 miles (Little River) Poor - 10% 3). Adjacent to Aquifer Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup 5.25 miles What town(s) does this hookup serve - Salem 2) Distance to nearest sewer hookup - 6.5 miles What town(s) does this hookup serve - Salem 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line - 33 KV-li-ne -- 4) Gas Pipeline; Distance to nearest gas main 1.25 miles F. Transportation 1) Highway; Type of road which services or is nearest to site primary (State Highway 125) Distance to primary road adjacent 2) Railroad; Site serviced by rail - No Distance to active rail line .7 miles TOWN: PLAISTOW A. Site PL-2 B. Size Approximately 510 acres C. Current Status 1) Existing Land Use: Forested Lands - 90% 2) Zoning Status: High Density-Residential 95% Residential - 5% Commercial 5% Open/Uncultivated - 5% D. Land and Water Resources 1) Land Capability: Excellent - 95% 2) Adjacent to surface fresh water Yes Poor - 5% Distance on site (Kelly,Brook) 3) Adjacent to Aquifer No Distance - .5 miles E. Utilities and Services 1) Distance to nearest major water hookup 4.0 miles What town(s) does this hookup serve - Salem 2) Distance to nearest sewer hookup - 5.5 miles What town(s) does this hookup serve - Salem 3) Utilities Available; Distance to 'nearest major transmission line .6 miles Type of transmission line - 33 KV line 4) Gas Pipeline; Distance to nearest gas main .75 miles F. Trans2ortation 1) Highway; Type of road which services or is nearest to site Primary (State Highway 125) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - No Distance to active rail line .7 miles TOWN: PLAISTOW A. Site PL-3 B. Size Approximately 270 acres C. Current Status 1) Existing Land Use: Forested lands - 65% 2) Zoning Status: High Density Residential - 50% - 50./ Residential - 15% Commercial Open/uncultivated - 10% Industrial - 5% Extractive, Quarry, Sandpit - 5% D. Land and Water Resources, 1) Land Capability: Excelle .nt 1100% 2) Adjacent to surface fresh wat@r Yes Distance on site (Little River) 3) Adjacent to Aquifer - No Distance - .5 miles E. Utilities and Services 1) Distance to nearest major water hookup 4.0 miles What town(s) does this hookup serve - Salem 2) Distance to nearest sewer hookup - 5.5 miles What town(s) does this hookup serve - Salem 3) Utilities Available; Distance to nearest major transmission.line .2 miles Type of transmission line - 33 KV line 4) Gas Pipeline; Distance to nearest gas main - adjacent F. Transportation 1) Highway; Type of road which services or is nearest to site Primary (State Highway 125) Distance to primary road - on site 2) Railroad; Site serviced by rail Yes Distance to active rail line on site TOWN: PLAiSTOW A. Site PL-4 B. Size Approximately 400 acres C. Current Status 1) Existing Land Use: Forested Lands - 70% 2) Zoning Status: Commercial - 60% Residential - 15% High Density Residential - 40c/Of Industrial - 5% Open/Uncu 1 ti va ted - 5% Marshlands 5% D. Land and Water Resources 1) Land Capability: Excellent 90% 2) Adjacent to surface fresh water Yes Fair 5% Distance- on site (Little River) Poor 5% 3) Adjacent to Aquifer No Distance - .75 miles E. Utilities and Services 1) Distance to nearest major water hookup 3.5 miles What town(s) does this hookup serve - Salem 2) Distance to nearest sewer hookup - 5.0 miles What town(s) does this hookup serve - Salem 3) Utilities Available; Distance to nearest major transmission line 1.0 mile Type of transmission line 33 KV 4) Gas Pipeline; Distance to nearest gas main .25 miles F. Transportation 1) Highway; Type of road which services or is nearest.to, site - primary (State Highway 125) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - Yes Distance to active rail line on site TOWN, PLAISTOW A. Site PL-5 B. Size Approximately 300 acres C. Current Status 1) Existing Land Use: Forested Lands - 90% 2) Zoning Status: High Density Residential - 45% Open/Uncultivatea - 10% Commercial - 35% Industrial - 20% Land and Water Resources 1) Land Capability: Excellent - 100% 2) Adjacent to surface fresh water - Yes Distance on site (Little River) 3) Adjacent to Aquifer No Distance - .5 miles E. Utilities and Services 1) Distance to nearest major water hookup 3.75 miles What town(s) does this hookup serve - Salem 2) Distance to nearest sewer hookup - 5.25 miles What.town(s) does this hookup serve - Salem 3) Utilities Available; Distance to nearest major transmi ssion line .9 miles Type of transmission line - 33 KV 4)- Gas Pipeline; Distance to nearett-gas main On site F. Transportation Highway; Type of road which services or is nearest to site primary,(State Highway 125) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - Yes Distance to active rail line on site TOWN: PLAISTOW A. Site PL-6 B. Size Approximately 730 acres C. Current Status 1) Existing Land Use: Forested Lands - 70% 2) Zoning Status: High Density Residential - 70% Open/Uncultivated - 10% Industrial - 30% Residential - 5% Agricultural - 5% Industrial - 5% Extractive, quarry, sandpit - 5% D. Land and Water Resources 1) Land Capability: Excellent - 75% 2) Adjacent to surface fresh water No Good - 20% Distance - .2 miles (tributary of Little River) Poor - 5% 1.0 miles (Little River) 3) Adjacent to Aquifer Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup 5.0 miles What town(s) does this hookup serve - Salem 2) Distance to nearest sewer hookup - 6.5 miles What town(s) does this hookup serve 7 Salem 3) Utilities Available; Distance to nearest major transmission line .8 miles Type of transmission line - 33 KV 4) Gas Pipeline; Distance to nearest gas main on site F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 108) Distance to primary road - 1.25 miles (State Highway 125) 2) Railroad; Site serviced by rail - No Distance to active rail line .8 miles TOWN: PLAISTOW A. Site PL-7 B. Size - Approximately 510 acres C. Current Status 1) Existing Land Use: Forested Lands 65% 2) Zoning Status: High Density Residential - 95% Golf Course- 20% Commercial - 5% Residential 5% Agricultural 5% Open/Uncultivated 5% D. Land and Water Resources 1) Land Capability: Excellent - 95% 2) Adjacent to surface fresh water Yes Poor - 5% Distance on site (Fishing River) 3) Adjacent to Aquifer Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup 4.5 miles What town(s) does this hookup serve - Salem 2) Distance to nearest sewer hookup - 6.0 miles What town(s) does this hookup serve - Salem 3) Utilities Available; Distance to nearest major transmission line 1.6 miles Type of transmission line - 33 KV line 4) Gat Pipeline; Distance to nearest gas main adjacent F. Transportation 1) Highway; Type of road which services or Is nearest to site secondary (State Highway 108) Distance td primary road - .7 miles (State Highway 125) 2) Railroad; Site serviced by rail - No - Distance to active rail line 1.2 miles IX ....... .. .......... gtown -20 L Ohe 07 A--,- R R. h. 90 ICIO "t.. 7( f. . .... 91 16 LAND CAPABILITY Intense Development Capability Moderate Development Capability TOWN: RAYMOND A. Site The Town of Raymond B. S-ize Approximately 18,496 acres, C. Current Status 1) Existing Land Use: Forested Lands 80% 2) Zoning Status: Medium Density Residential - 90% Residential - less than 5% High Density Res@idential - 10% Institutional - less than 5% Marshlands - less than 5% Water Areas - less than 5% Open/Uncultivated - less than 5% Agriculture - less than 5% Industrial - less than 5% Commercial - less than 5% Extractive, Quarry, Sandpit less than 5% D. Land and Water Resources 1) Land Capability: Excellent,- 45% 2) Adjacent to surface fresh water Yes Good - 20% Distance on site (Lamprey River, Pawtuckaway Fair - 20% River, Exeter River, Fordway Poor - 10% Brook, Onway Lake, Governor's Existing Urban - 5% Pond, Carroll Lake, Dead Pond, Norton Pond) 3) Adjacent to Aquifer - Yes Distance - on site (1 aquifer) E. Utili-ties and Services- 1) Distance to nearest major water hookup on site What town(s) does this hookup serve Raymond 2) Distance to nearest sewer hookup - 2.75 miles What town(s) does this hookup serve - Epping 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line - 345 KV, 33 KV 4) Gas Pipeline; Distance to nearest gas main 9.0 miles F. Transportation 1) Highway; Type of road which services or is nearest to site primary State Highway 101) secondary Mate Highway 107, State Highway,102) State Highway 156 Distance to primary road - on site (State Highway 101) 2) Railroad; Site serviced by rail - Yes Distance to active rail line on site 7@ T, ol@ ...0 16 h 00- cc am Q -Yoo,e :-7- - 7 @7` 7 @Nc 00 it CLa 01' 21 '10 rn Gas oia A-40 Qw i k7 &3A /8 if 41 7 7,@7 0 yog .0 J---e TOWN: ROCHESTER A. Sit-e - RO-I B. Size - Approximately 360 acres C. Current Status 1) Existing Land Use: Forested Lands - 80% 2) Zoning Status: Agricultural 100% Open/Uncultivated - 10% Marshlands - 5% Water Area - 5% D. Land and Water Resources 1) Land Capability: Excellent - 85% 2) Adjacent to surface fresh water Yes Poor - 15% Distance on site (Berrys River, unnamed pond) 3) Adjacent to Aquifer - No Distance - 2.25 miles E. Utilities and Services 1) Distance to nearest major water hookup 2.5 miles What town(s) does this hookup serve - Rochester 2) Distance to nearest sewer hookup - 3.0 miles What town(s) does this hookup serve - Rochester 3) Utilities Available; Distance to nearest major transmission line .3 miles Type of transmission line-- 345 KV- 4) Gas Pipeline; Distance to nearest gas main 3.0 miles F. Transportation 1) Highway; Type of road which services or is nearest to site town road Distance to primary road - 2.75.miles (State Highway 11) 2) Railroad; Site serviced by rail - No Distance to active rail line 2.7 miles TOWN: ROCHESTER A. Site RO-2 Size Approximately 260 acres C. Current Status. 1) Existing Land Use: Forested Lands - 60% 2) Zoning Status: Agricultural 100% Open/Uncultivated - 20% Agricultural - 15% Residential - 5% D. Land and Water Resources 1) Land Capability- Excellent - 80% 2) Adjacent to surface fresh water No Poor - 15% Distance .55 miles (Rochester Reservoir) Existing Urban - 5% .7 miles (Baxter Lake) 3) Adjacent to Aquifer No .Distance 2.0 miles E. Utilities and Services 1) Distance to nearest major water hookup 1.75 miles What town(s) does this hookup serve - Rochester 2) Distance to nearest sewer hookup - 2.25 miles What town(s) does this hookup serve - Rochester 3) Utilities Available; Distance to nearest major -transmission line on.site Type of transmission line - 345 KV 4) Gas Pipeline; Distance to nearest gas main 2.25 miles F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 202A) Distance to primary road - 2.2.miles (Spaulding Turnpike) 2) Railroad; Site serviced by rail - No Distance to active rail line - 2.4 miles,@ TOWN: ROCHESTER A. Site R073 B. Size - Approximatley 510 acres C. Current Status 1) Existing Land Use: Forested Lands - 85% 2) Zoning Status: Agricultural 100% Residential - 10% Open/Uncultivated - 5% D. Land and Water Resources 1) Land Capability: Excellent.- 45% 2) Adjacent to surface fresh water Yes Good - 40% Distance on site (Rochester Reservoir, Howard Brook) Fair - 5% Poor - 5% Existing Urban - 5% 3) Adjacent to Aquifer - No Distance - 1.75 miles E. Utilities and Services 1) Distance to nearest major water hookup 1.0 miles What town(s) does this-hookup serve - Rochester 2) Distance to nearest sewer hookup - 2.0 miles What town(s) does this hookup serve - Rochester 3) Utilities Available; Distance to nearest major transmission 111ne .2 miles- Type of transmission line - 345 KV 4) Gas' Pipeline; Distance to nearest gas main 1.75 miles F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 202A) Distance to primary road - 1.7 miles (Spaulding Turnpike) 2) Railroad; Site serviced by rail - No Distance to active rail line 2.6 miles TOWN: ROCHESTER A. Site RO-4 B. Size Approximately 490 acres C. Current Status 1) Existing Land Use: Forested Lands - 95% 2) Zoning Status: Agricultural 100% Agricultural - 5% D. Land and Water Resources 1) Land Capability: Excellent - 40% 2) Adjacent to surface fresh water - Yes Good - 60% Distance on site (Rickers Brook) 3) Adjacent to AquiferINo .55 miles (Baxter La ke) Distance - .75 miles E. Utilities and Services 1) Distance to nearest major water hookup .75 miles What town(s) does--this hookup serve - Rochester 2) Distance to nearest sewer hookup - 1.0 miles What town(s) does this hookup serve - Rochester 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line - 345 KV 4) Gas Pipeline; Distance to nearest gas main - 1.0 mile F. Transportation I') Highway; Type of road which services or is nearest to site secondary (State High way 202A) Distance to primary road - .8 miles (Spaulding Turnpike) 2) Railroad; Site serviced by rail - No Distance to active rail line 1.6 miles TOWN: ROCHESTER, A. Site. - R.0-5 B. Size - Approximately 640 acres C. Current Status 1) Existing Land Use: Forested lands. - 85% 2) Zoning Status: Agricultural 100% Open/Uncultivated - 10% Residential - 5% D. Land and Wa'ter Resources 1) Land Capability: Excellent- 40% 2) Adjacent to.surface fresh water Yes Good Do% Distance on site (Rickers Brook, Axe Handle Brook, Howard Brook) 3) Adjacent to Aquifer No Distance - .25 miles E. Utilities and Services 1) Distance to nearest major water hookup on site What town(s) does-this hookup serve - Rochester 2) Distance to nearest sewer hookup - .3 miles What town(s) does this hookup serve - Rochester 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line - -115-KV 4) Gas Pipeline; Distance to nearest gas main .25 miles F. Transportation 1) Highway; Type of road which services or is nearest to site primary (Spaulding Turnpike) secondary (State Highway 202A, U.S. 202) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - No Distance to active rail line 1.2 miles TOWN: ROCHESTER A. Site RO-6 B. Size Approximately 280 acres C. Current Status 1) Existing Land Use: Forested Lands - 85% 2) Zoning Status: Agricultural - .95% Residential - 5% High Density Residential - 5%. Open/Uncultivated - 5% Marshlands - 5% D. Land and Water Resources 1) Land Capability: Good - 95% 2) Adjacent to surface fresh water No Fair - 5% Distance .1 mile Axe Handle Brook) .3 mile @Hanson Pond) 3) Adjacent to Aquifer No Distance - .75 miles Utilities and Services 1) Distance to nearest major water hookup on site What town(s) does this hookup serve - Rochester 2) Distance to nearest sewer hookup - .5 mile What town(s) does this hookup serve - Rochester 3) Utilities Available; Distance to nearest major transmission line .1 mile Type of transmission line --115 KV 4) Gas Pipeline; Distance to nearest gas main -,.75 mile F. Transportation 1) Highway; Type of road which services or Js nearest to site secondary (U.S. 202) Distance to primary road - .7 mile (Spaulding Turnpike). 2) Railroad; Site serviced by rail - No Distance to active rail line 1.1 miles TOWN: ROCHESTFR A. Site RO-7 B. Size Approximately 1000 acres C. Current Status 1) Existing Land Use: Forested Lands - 55% 2) Zoning Status: Agricultural - 1_5% Open/Uncultivated - 25% High Density Residential - 45% Marshlands - 15% Extractive, Quarry, Sandpit - less than 5% Agricultural - less than 5% D. Land and Water Resources 1) Land Capability: Excellent - 75% 2) Adjacent to surface fresh water Yes Good - 15% Distance on site (Hanson Pond, Isinglass River) Fair - 5% Poor - 5% 3) Adjacent to Aquifer - No Distance .5 mile E. Utilities and Services 1) Distance to nearest major water hookup .1 mile What town(s) does this hookup serve - Rochester 2) Distance to nearest sewer hookup - adjacent - What town(s) does this-hookup serve --Rochester 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line - 115 KV 4) Gas Pipeline; Distance to nearest gas main .75 miles F. Transportation 1) Highway; Type of road which services or is nearest to site.- primary (State Highway 125) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - No Distance to active rail line 1.3 miles TOWN: ROCHESTER A. Sitp RO-8 B. Size Approximately 280 acres C. Current. Status 1) Existing Land Use: Forested Lands - 55% 2) Zoning Status: Agricultural - 55%@ Agricultural - 25% High Density Residential - 40% Open/Uncultivated - 20% Industrial - 5% D. Land and Water Resources 1) Land Capability: Excellent - 85% 2) Adjacent to surface fresh water - No Fair - 5% Distance'- .1 mile (Cocheco River) Poor - 10% 3) Adjacent to Aquifer No 'Distance - .5 mile E. Utilities and Services 1) Distance to nearest major water hookup .2 miles What town(s) does this hookup serve - Rochester 2) Distance to nearest sewer hookup - .4 mile What town(s) does this hookup serve - Rochester 3) Utilities Available; Distance to nearest major transmission line 1.2-miles Type of transmission line - 115 KV 4) Gas Pipeline; Distance to nearest gas main adjacent F. Transportation 1) Highway; Type of road which services or is nearest to site primary (Spaulding Turnpike) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - No Distance to active rail line .8 mile. TOWN: ROCHESTER A. Site - RO-9 B. Size - Approximately 260 acres C. Current Status 1) Existing Land Use: Forested Lands - 70% 2) Zoning Status: Agricultural 100% Extractive, Quarry, Sandpit - 20% Open/Uncultivated - 10% D. Land and Water Resources 1) Land Capability: Excellent 100% 2) Adjacent to surface fre sh water Yes Distance - on site (Clark Brook) 3) Adjacent to Aquifer No Distance - 1.0 mile E. Utilities and Services 1) Distance to nearest major water hookup .9 mile What town(s) does this hookup serve Rochester 2) Distance to nearest sewer hookup - 1.3 miles What town(s) does this hookup serve - Rochester 3) Utilities Available; Distance to nearest major transmission line 1.6 miles Type of transmission 'line 33 KV 4) Gas Pipeline; Distance to nearest gas main - adjacent F Tran5portation 1) Highway; Type of road which services or is nearest to site - primary (Spaulding Turnpike) secondary (State Highway 16B) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - No Distance to active rail'line 1.5 miles TOWN: ROCHESTER A. Site RO-10 B. Size Approximately 410 acres C. Current Status 1) Existing Land Use: Forested Lands - 75% 2) Zoning Status: Agricultural 100% Open/Uncultivated - 10% Marshlands - 5% Industrial - 5% Residential - less than 5% Water Area - less than 5% D. Land and Water Resources 1) Land Capability: Excellent - 85% 2) Adjacent to surface fresh water Yes Poor - 15% Distance on site (Champlin Pond, Blackwater Brook) 3) Adjacent to Aquifer Yes Distance - adjacent E. Utilities and Services 1) Distance to nearest major water hookup on site What town(s) does this hookup serve Rochester 2) Distance to nearest sewer hookup 1.5 miles What town(s) does this hookup serve - Rochester or Somersworth 3 Uti1ities Available; Distanc e to neares t major transmission I Ine, ._3 mile Type of transmission line - 33 KV 4) Ga's Pipeline; Distance to.nearest gas main .25 mile F. Transportation 1) Highway; Type of road whichservices or is nearest to site primary (State Highway 16) Distance to primary road - adjacent 2) Railroad; Site serviced:-by rail - No Distance to active rail line .3 mile TOWN: ROCHESTER A. Site RO-11 B. Size Approximately 560 acres C. Current Status 1) Existing Land Use: Forested Lands - 85% 2) Zoning Status: Agricultural 100% Residential - 5% Open/Uncultivated - 5% Marshlands - 5% D. Land and Water Resources 1) Land Capability: Excellent - 55% 2) Adjacent to surface fresh water Yes Good - 40% Distance adjacent (Salmon Falls River) Poor - 5% 3) Adjacent to Aquifer Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup on site What town(s) does this hookup serve - Rochester 2) Distance to nearest sewer hookup - 1.3 miles What town(s) does this hookup serve - Rochester 3) Utilities Available;-D,istance-to nearest major transmission line on site Type of transmission line - 33 KV 4) Gas Pipeline; Distance to nearest gas main .75 miles F. Transportation 1) Highway; Type of road which services or is nearest to site primary (State Highway 16) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - Yes Distance to active rail line on site TOWN: ROCHESTER A. Site - RO-12 B. Size - Approximately 1080 acres C. Current Status 1) Existing Land Use: Forested Lands - 80% 2) Zoning Status: Agricultural - 65% Residential - 5% High Density Residential - 25% Open/Uncultivated - 5% Industrial - 10% Extractive, Quarry, Sandpit - 5/10 Marshlands - 5% D. Land and Water Resources 1) Land Capability: Excellent'- 60% 2) Adjacent to surface fresh water Yes Good - 25% Distance adjacent (Salmon Falls River) Poor - 15% 3) Adjacent to Aquifer No Distance - .25 miles E. Utilities and Services 1) Distance to nearest major water hookup on site What town(s) does this hookup serve - Rochester 2) Distance to nearest sewer hookup - 1.1 miles What town(s) does this hookup serve Rochester 3) Utilities Available; Distance to nearest major transmission line - on site Type of transmission line - 345 KV, 33 KV 4) Gas Pipeline; Distance to nearest gas main on site F. Transportation 1) Highway; Type of road which services or is nearest to site primary (State Highway 16) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - Yes Distance to active rail line on site TOWN: ROCHES14ER 'NILS A. Site RO-13 B. Size Approximately 1540 acres C. Current Status 1) Existing Land Use: Forested Land - 70% 2) Zoning Status: Agricultural 100% Extractive, Quarry, Sandpit - 10% Marshlands - 10% Open/Uncul tivated - 5% Residential - less than 5% Solid Waste less than 5% D. Land and Water Resources 1) Land Capability: Excellent - 65% 2) Adjacent to surface fresh water Yes Good - 20% Distance on site (Cocheco, River) Fair - 5% Poor - '5 Existing Urban 5% 3) Adjacent to Aquifer Yes Distance - on site E Utilities and Services 1) Distance to nearest major water hookup .1 miles What town(s) does this hookup serve - Rochester 2) Distance to nearest sewer hookup .1 Miles What town(s) does this hookup serve - Rochester 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line - 345 KV 4) Gas Pipeline; Distance to nearest gas main .5 miles F. Transportation 1) Highway; Type of road which services or is nearest to site primary (Spaulding Turnpike, State Highway 11) Distance to primary road - adjacent 2) Railroad; Site servited by rail - Yes Distance to active rail line on site TOWN: ROCHESTER A. Site RO-14 B. Size Approximately 640 acres C. Current Status 1) Existing Land Use: Forested Lands - 80% 2) Zoning Status: Agricultural 100% Residential - 10% Extractive, Quarry, Sandpit - 5% Open/Uncultivated - 5% D. Land and Water Resources 1) Land Capability: Excellent - 85% 2) Adjacent to surface fresh water No Poor - 15% Distance .15 miles (Cocheco River) 3) Adjacent to Aquifer - Yes Distance - on'site E. Ut4lities and Services 1) Distance to nearest major water hookup adjacent What town(s) does this hookup serve - Rochester 2) Distance to nearest sewer hookup - .3 miles What town(s) does this hookup serve - Rochester 3) Utilities Available; Distance to nearest major transmission line on site Type oftransmission line - 345 KV 4) Gas Pipeline; Distance to nearest gas main - .5 miles F. Transportation 1) Highway; Type of road which services or is nearest to site primary (State Highway 11) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - Yes Distance to active rail line adjacent *Town: PO.,76 Cal PO 40 48 29 N LAND CAPABILII Intense Developn Moderate Develop TOWN: SANDOWN Owl, A. Site The Town of Sandown B. Size Approximately 8,832 acres C. Current Status 1) Existing Land Use: Forested Lands - 80% 2) Zoning Status: Medium Density Residentia 1 90% Residential - 5% High Density Residential 10% Open/Uncultivated - 5% Water Areas - less than 5% Marshlands - less than 5% Industrial - less than 5% Commercial - less than 5% Agriculture - less than 5% Extractive,,Quarry, Sandpit - less th6n 5%. D. Land and Water Resources 1) Land Capabi-lity: 'Excellent - 25% 2) Adjacent to surface fresh water Yes Good - 45% Distance on site (Lily Pond, Cub Pond, Philips. Fair - 150110 Pond, Angle Pond, Exeter River, Poor - 101/10 Punch Pond, Showell Pond, Existing Urban - 5% Hunt Pond, Bartlett Brook) 3) Adjacent to Aquifer - No Distance - .25 mile (Danville or Fremont) E. Uti.lities and Services 1) Distance to nearest major water hookup 4.0 miles What town(s) does this hookup serve - Derry, Londonderry 2) Distance to nearest sewer hookup - 2.0 miles What town(s) does this-hookup serve - Derry 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line - 115 KV 4) Gas Pipeline; Distance to nearest gas main 5.0 miles F. Transportation 1) Highway; Type of road which services or is nearest to site State Highway 121A Distance to primary road - 3.5 miles (State Highway 125) 2) Railroad; Site serviced by-rail - No Distance to active rail line 2.0 miles *Town: Somersworth AAI Is L j/ ly nd 2 t;t?nd Pp g, 3 IGA 12, In Ca A, 70 ul rYl; lz P0 "PON'' SOMER' WORTH 0 EST. P P. Willond 7,6641. Pond T, A 01 TOWN: SOMERSWORTH A. Site SO-1 B. Size Approximately 240 acres C. Current Status 1) Existing Land Use: Forested Lands 100% 2) Zoning Status: Industrial - 65% Commercial - 25% Aqricultural - 10% D. Land and Water Resources 1) Land Capability: Excellent - 95% 2) Adjacent to surface fresh water Yes Poor - 5% Distance - adjacent (Blackwater Brook) 3) Adjacent to Aquifer Yes Distance - on site E. Utilities and Services, 1) Distance to nearest major water hookup on site What town(s) does this hookup serve - Somersworth 2) Distance to nearest sewer hookup - .75 mile What town(s) does this hookup serve - Somersworth 3) Utilities Available; Distance to nearest major transmission line .2 mile - -Type of transmission line - 33 KV 4) Gas Pipeline; Distance to nearest gas main on site F. Transportation 1). Highway; Type of road which services or is nearest to site primary (State Highway 16) Distance to primary road - adjacent .2) Railroad; Site serviced by rail - No Distance to active rail line .7 mile I-OWN: SOMERSWORTH A. Site SO-2 B. Size Approximately 490 acres C. Current Status 1) Existing Land Use: Residential - 30% 2)" Zoning Status: Agricultural - 60% Extractive, Quarry, Sandpit - 25% High Density Residential - 35% Forested Lands - 25% Industrial - 5% Open/Uncultivated - 15% Agriculture - 5% D. Land and Water Resources 1) Land Capability: Excellent - 75% 2) Adjacent to surface fresh water - Yes Poor - 5% Distance adjacent Tates Brook, Peters Marsh Brook) Existing Urban - 20% .35 mile @Salmon Falls River) 3) Adjacent to Aquifer - Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup on site What town(s) does this hookup serve - Somersworth 2) Distance to nearest sewer hookup - on site What town(s) does this hookup serve - Somersworth 31 Utilities Available; D istance to nearest major transmlssfonline@- A mile Type of transmission line - 33 KV 4) Gas Pipeline; Distance to nearest gas main on site F. Transportation 1) Highway; Type of road which services or is nearest to site - primary State Highway 9, State Highway 16A) secondary Mate Highway 16A) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - No Distance to active rail line - .3 mile TQWN: SOMERSWORTH A. Site SO-3 B. Size Approximately 310 acres Current Status 1) Existing Land Use: Forested Lands - 50% Zoning Status High Density Residential - 50% Open/Uncultivated - 30% Agricultural - 40% Residential - 10% Commercial - 10% Marshlands - 10% D. Land and Water Resources 1) Land Capability: Excellent - 80% 2) Adjacent to surface fresh water - Yes Poor - 20% Distance on site (Twombly Brook) 3) Adjacent to Aquifer - Yes Distance - adjacent E. Utilities and Services 1) Distance to nearest major water hookup on site What town(s) does this hookup serve - Somersworth 2) Distance to nearest sewer hookup - adjacent What town(s) does this hookup serve @- Somersworth @3) Utilities Available; Distance to nearest r@ajor transmission line adjacent Type of -transmission line -- 33 -KV 4) Gas Pipeline; Distance to nearest gas main .75 mile F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (town road) Distance to primary road - .7 mile (State Highway 9, State Highway 16A) 2) Railroad; Site serviced by rail - Yes Distance to active rail line adjacent TOWN: SOMERSWORTH A. Site- SO-4 B. Size - Approximately 460 acres C. Current Status 1) Existing Land Use: Forested Land 70% 2) Zoninq Status: High Density Residential - 65% Golf Course 15% Recreational - 35% Open/Uncultivated 15% D. Land and Water Resources 1) Land Capability: Excellent - 80% 2) Adjacent to surface fresh water - No Fair - 10% Distance .3 mile (Willand Pond) Poor - 10% 3) Adjacent to Aquifer Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup on site What town(s) does this hookup serve - Somersworth 2) Distance to nearest sewer hookup - .1 mile What town(s) does this hookup serve - Somersworth 3) -Utilities Available; Distance to nearest major transmission line on site Type of transmission 1 ine -- 33- XV - 4) Gas Pipeline; Distance to nearest gas main on site F. Transportation 1) Highway; Type of road which services or is nearest to site primary (State Highway 9, State Highway 16A) secondary (town road) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - No Distance to active rail line .6 mile TOWN: WMUMRTH A. Site - SO-5 B. Size - Approximately 260 acres C. Current Status 1) Existing Land Use: Forested Lands - 90% 2) Zoning Status: Agricultural - 75% Residential - 10% Commercial - 25% D. Land and Water Resources -"ace fresh water - Yes 1) Land Capability: Good - 85% 2) Adjacent to surl Poor - 10% Distance on site (Reyners Brook, Blackwater Brook) Existing Urban - 5% 3) Adjacent to Aquifer Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup adjacent What town(s) does this hookup serve - Somersworth 2) Distance to nearest sewer hookup - .3 miles What town(s) does this hookup serve - Dover 3) Utilities Ava'ilable; Distance to nearest major transmission line .4 mile Type of transmission line - 33 KV 4) Gas Pipeline; Distance to nearest gas main .25 mile F. Transportation 1) Highway; Type of road which services or Is nearest to site primary (State Highway 16) secondary (State Highway 16B) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - No Distance to active rail line 1.9 miles TOWN: SOMERSWORTH A. Site - SO-6 B.. Size - Approximately 510 acres C. Current Status 1) Existing Land Use: Forested Lands - 50% 2) Zoning Status: Agricultural - 70% Open/Uncultivated - 15% 'Recreational - 20% Water Areas - 10% High Density Residential - 10% Residential - 10% Commercial - 5% Extractive, Quarry, Sandpit - 5% Solid Waste Disposal - 5% D. Land and Water Resources 1) Land Capability: Good - 85% 2) Adjacent to surface fresh water - Yes Poor - 10% Distance on site (Willand Pond, Peters Marsh Brook) Existing Urban - 5% 3) Adjacent to Aquifer - Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup on site What town(s) does this hookup serve - Somersworth 2). Distance to nearest sewer hookup - adjacent What town(s) does this -hookup serve - -Dover 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line - 33 KV 4) Gas Pipeline; Distance to nearest gas main - on site F. Transportation 1) Highway; Type of road which services or is nearest to site primary (State Highway 9, State Highway16A Distance to primary road - adjacent State Highway 16) 2) Railroad; Site serviced by rail - No Distance to active rail line - 1.5 miles *Town: Straffo cl, Ord 04, S t c) oAO 411, Goo 00 Bor Q, d 1 00 Svoilor a G fy c net It o, Willey 96 "St 2'-' ponds POPUL CIO 00 0..$ c 1.6 ,,Wer 'Ain Sir t o 0 & or's Mir%. /@O Ar Q. P@ Ile- Al 0 -00ce, POSA @16 it onus O)J' e. "o 41'k ce on LI N% Oo oo TOWN: STRAFFORD A. Site ST-I B. Size Approximately 1720 acres C. Current Status 1) Existing Land Use: Forested Lands 90% 2) Zoning Status: Single Zoning Marshlands 5% Residential less than 5% Open/Uncultivated less than 5% D. Land and Water Resources 1) Land Capability: Excellent - 60% 2) Adjacent to surface fresh water Yes Good - 30% Distance on,,site (Big River) Poor - 10% 3) Adjacent to Aquifer Yes Distance - on site E. Ut'llitie� and Services 1) Distance to nearest major water hookup 4.75 miles What town(s) does this hookup serve - Pittsfield 2) Distance to nearest sewer hookup - 5.25 miles What town(s) does this'hookup serve - Farmington 3 is ce to nearest major ransmission Utilities Available; 0' tan t line 4.4 miles Type of transmission line - 345 KV 4) Gas Pipeline; Distance to nearest gas main 7.75 miles F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 126) Distance to primary road - 5.5 miles (State Highway 11) 2) Railroad; Site serviced by rail - No Distance to active rail line 5.6 miles TOWN: STRAFFORD A. Site - ST-2 B. Size - Approximately 1050 acres C. Current Status 1) Existing Land Use: Forested Lands - 95% 2) Zoning Status: Single Zoning Water Area - 5% D. Land and Water Resources 1) Land Capability: Excellent - 50% 2) Adjacent to surface fresh water Yes Good - 40% Distance on site (Mohawk River) Fair 10% 3) Adjacent to Aquifer Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup 4.75 miles What town(s) does this hookup serve - Rochester 2) Distance to nearest sewer hookup - 6.0 miles What town(s) does this hookup serve - Rochester 3) Utilities Available; Distance to nearest major transmission line .8 mile Type of tran-smission line 345 KV 4) Gas Pipeline; Distance to nearest gas main 5.75 miles .F. Transportation, 1) Highway; Type of road which services or is nearest to site secondary (State Highway 202A) Distance to primary road - 5.25 miles (U.S. 4) 2) Railroad; Site serviced by rail - No Distance to active rail line 5.5 miles TOWN: STRAFFORD A. Site Sl`-3 B. Size Approximately 1330 acres C. Current Status 1) Existing Land Use: Forested Lands - 90% 2) Zoning Status: Single Zoning Open/Uncultivated - 5% Marshlands - less than 5% Residential - less than 5% D. Land and Water Resources 1) Land Capability: Excellent - 85% 2) Adjacent to surface fresh water Yes Good - 5% Distance on site (Isinglass River) Fair - 5% Poor - 5% 3) Adjacent to Aquifer No Distance - .25 mile E. Utilities and Services 1) Distance to nearest major water hookup 4.75 miles What town(s) does this hookup serve - Rochester 2) Distance to nearest sewer hookup - 5.5 miles What town(s) does this hookup serve - Rochester 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission line - 345 KV 4) Gas Pipeline; Distance to nearest gas main 5.75 miles F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 202A, State Highway 126) Distance to primary road 3.0 miles (U.S. 4) 2) Railroad; Site serviced by rail - No Distance to active rail line 6.2 miles TOWN: STRI' VFORD A. Site ST-4 B. Size - Approximately 640 acres C. Current Status 1) Existing Land Use: Forested Lands - 85% 2) Zoning Status: Sinqle Zoning Open/Uncultivated - 15% D. Land and Water Resources 1) Land Capability: Good - 85% 2), Adjacent to surface fresh water Yes Fair - 10% Distance on site (Spruce Brook, Spruce Ponds, Hall Broo Poor - 5% 3) Adjacent to Aquifer - No Distance - 2.75 miles E. Utilities and Services 1) Distance to nearest major water hookup 7.25 miles What town(s) does this hookup serve - Rochester 2) Distance to nearest sewer hookup - 7.75 miles What town(s) does this hookup serve - Rochester 3) Utilities Available; Distance to nearest major transmission line on site Type of transmission I ine 345- KV 4) Gas Pipeline; Distance-to nearest gas main 8.0 miles F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 202A) Distance to primary road - 1.4 miles (U.S. 4) 2) Railroad; Site serviced by rail - No Distance to active rail line 8.5 miles f *Town; South Ground Hill 411 3T oaL Hill Po"YWOW RIVER FP STATE FORFST PA W, 1970 PCIP U, -ATI(),4 558 IT a 11,23 20 so "I oil Harm to 4. sowyers Hill Pend 3 0 TOWN: SOUTH HAMPTON A. Site - SH-1 B. Size - Approximately 280 acres C. Current Status 1) Existing Land Use: Forested - 85% 2) Zoning Status: Medium Density Residential 100% Open/Uncultivated - 15% D. Land and Water Resources 1) Land Capability: Excellent - 45% 2) Adjacent to surface fresh water - Yes Good - 50% Distance adjacent (Grassy Brook) Poor - 5% 3) Adjacent to Aquifer No Distance - 1.0 miles E. Utilities and Services 1) Distance to nearest major water hookup 2.5 miles What town(s) does this hookup serve Seabrook 2) Distance to nearest sewer hookup - 4.5 miles What town(s) does th is hookup serve - Exeter 3) Utilities Available; Distance to nearest major transmission line 3.2 miles Type of transmission 1-ine -,33 KV- 4) Gas Pipeline; Distance to nearest gas main 1.0 miles F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 107A) Distance to primary road - 3.5 miles (State Highway 125) 2) Railroad; Site serviced by rail - No Distance to active rail line 1.7 miles TOWN: SOUTH @MPTON A. Site SH-2 B. Size Approximately 510 acres .C. Current Status 1) Existing Land Use: Forested Lands - 65% 2) Zoning Status: Medium Density Residential - 80% Agricultural - 15% Commercial - 20% Open/Uncultivated - 10% Commercial - 5% Marshlands - 5% D. Land and Water Resources 1) Land Capability: Excellent - 75% 2) Adjacent to surface fresh water Yes Good - 20% Distance adjacent (Grassy Brook, Powwow River) Poor - 5% 3) Adjacent to Aquifer - No Distance - 1.25 miles E. Utilities and Services 1) Distance to nearest major water hookup 1.75 miles What town(s) does this hookup serve - Seabrook 2) Distance to nearest sewer hookup - 5.25 miles What town(s) does this hookup serve - Exeter 3) Utilities Available; Distance to nearest major transmission line 4.5 miles. Type of transmission line - 33 KV 4) Gas Pipeline; Distance to nearest gas main 1.75 miles F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 107A) Distance to primary road - 3.0 miles (Interstate 95) 2) Railroad; Site serviced by rail - No Distance to active rail line 3.2 miles TQWN: $QVTH HAMPTQN A. Site SH-3 B. Size Approximately 740 acres C.. Current Status 1) Existing Land Use: Forested Lands - 80% 2) Zoning Status: Medium Density Residential - 80% Residential - 5% Commercial - 20% Agricultural - 5% open/Uncultivated - 5% Marshlands - 5% D. Land and Water Resources .1) Land Capability: Excellent - 20% 2) Adjacent to surface fresh water Yes Good - 60% Distance on site (Black River) Poor - 20% 3) Adjacent to Aquifer Yes Distance - adjacent E. Utilities and Services 1) Distance to nearest major water hookup .5 miles What town(s) does this hookup-serve - Seabrook 2) Distance to nearest sewer hookup - 4.25 miles What town(s) does this hookup serve - Hampton, North Hampton 3) Utilities Avail-able; Distance to nearest major transmission line 3.5 miles Type of transmission line - 33 KV 4) Gas Pipeline; Distance to nearest gas main .5 miles F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (State.--Highway 150) Distance to primary road - 2.25 miles (Interstate 95) 2) Railroad; Site serv'iced by rail - No Distance to active rail line 3.2 miles *Town; Wakefield <or Wa 3 Wa-2 Iq Ny Oo 01 ID AD rr"77 TOWN: WAKEFIELD A. Site - WA-1 B. Size - Approximately 440 acres C. Current Status 1) Existing Land Use: Forested Lands - 60% 2) Zoning Status: No Zoning Marshlands - 20% Extractive, Quarry, Sandpit - 20% D. Land and Water Resources 1) Land Capability: Excellent - 95" 2) Adjacent to surface fresh water Yes /0 Poor - 5% Distance on site (Branch River, Churchill Brook) .3 mile (Lovell Lake) 3) Adjacent to Aquifer Yes Distance - on site E. U'ilities and Services 1) Distance to nearest major water hookup on site What town(s) does this hookup serve - Wakefield 2) Distance to nearest sewer hookup - 7.25 miles What town(s) does this hookup serve - Wolfeboro 3) Utilities Available; Distance to nearest major transmission line 9.5 miles Type of transmission line - 33 KV 4) Gas Pipeline; Distance to nearest gas main 13.0 miles F. Transportation 1) Highway; Type of road which services or is nearest to site primary (State Highway 16) secondary (State Highway 109) State Highway.168 Distance to primary road - adjacent 2) Railroad; Site serviced by rail - Yes Distance to active rail line on site TOWN: WAKEFIFLO @A. Site - WA-2 B. Size - Approximately 690 acres C. Current Status 1) Existing Land Use: Forested Lands - 85% 2) Zoninq Status: No Zoning Marshlands - 10% Open/Uncultivated - 5% D. Land and Water Resources 1) Land Capability: Excellent - 50% 2) Adjacent to surface fresh water Yes Good - 50% Distance on site (Copp Brook) adjacent (Great East Lake) 3) Adjacent to Aquifer - No Distance - 1.5 miles E. Utilities and Services 1) Distance to nearest miaior water hookup .8 mile What town(s) does this hookup serve - Wakefield 2) Distance to nearest sewer hookup - 8.25 miles What town(s) does this hookup serve - Wolfeboro 3) Utilities Available; Distance to nearest major transmission line 10.8 miles Type of transmission line 33 KV 4) Gas Pipeline; Distance to nearest gas main 15.5 miles F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 153) Distance to primary road - .76 mile (State Highway 16) 2) Railroad; Site serviced by rail - No Distance to active rail line .1 mile TOWN; WAKEFIELD A. Site I-M-3 B. Size - Approximately 460 acres C. Current Status 1) Existing Land Use: Forested Lands - 95% 2) Zoning Status: No Zoning Open/Uncultivated - 5% D. Land and Water Resources 1) Land Capability: Excellent - 10% 2) Adjacent to surface fresh water Yes Good - 75% Distance on site (Copp Brook Fair - 10% .8 mile (Great East Lake) Poor - 5% 3) Adjacent to Aquifer - No Distance - 1.0 mile E. Utilities and Services 1) Distance to nearest major water hookup .5 mile What town(s) does this hookup serve - Wakefield 2) Distance to nearest sewer hookup - 7.5 miles What town(s) does this hookup serve - Wolfeboro 3) Utilities Available; Distance to nearest major transmission line.- 10.0 miles - Type of transmission-li-ne--- 33-KV 4) Gas Pipeline; Distance to nearest gas main 15.75 miles F. Transportation 1) Highway; Type of road which services or is nearest to site primary (State Highway 16) secondary (State Highway 153) State Highway' 16B Distance to primary road - adjacent 2) Railroad; Site serviced by rail - Yes Distance to active rail line on site TOWN: WAKEFIELD A. Site WA-4 B. Size Approximately 260 acres C. Current Status 1) Existing Land Use: Forested:1ands - 90% 2) Zoning Status: No Zoninq Residential - 10% D. Land and Water Resources 1) Land Capability: Excellent - 90% 2) Adjacent to surface fresh water No Poor - 10% Distance .1 mile (Pine River Pond) 3) Adjacent to Aquifer - Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup 4.0 miles What town(s) does this hookup serve - Wakefield Distance to nearest sewer hookup - 6.75 miles What town(s) does this hookup serve - Wolfeboro 3) Utilities Available; Distance to nearest major transmission line 8.0 miles Type of transmission line - 33 KV --4) Gas-Pipeline;--Distance--to-nearest gas main 19.2-5 miles- F. Trans ortation 1) Highway; Type of road which services or is nearest to site primary (State Highway 16) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - Yes Distance to active rail line on site TOWN: WAKUIRP A. Site WA-5 B. Size Approximately 280 acres C. Current Status 1) Existing Land Use: Forested Lands 100% 2) Zoning Status: No Zoning D. Land and Water Resources 1) Land Capability: Excellent - 65% 2) Adjacent to surface fresh water Yes Good - 35% Distance adjacent (Pine' River Pond) 3) Adjacent to Aquifer Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup -4.25 miles What town(s) does this hookup serve - Wakefield 2) Distance to nearest sewer hookup - 7.5 miles What town(s) does this hookup serve - Wolfeboro 3) Utilities Available; Distance to nearest major transmission line 8.7 miles Type of transmission line - 33 KV 4) Gas Pipeline; Distance to-nearest-gasmain --19-.-25 F. Transportation 1) 'Highway; Type of road which services or Is nearest to site primary (State Highway 16) Distance to primary road - adjacent 2) Railroad; Site serviced by rail - Yes Distance to active rail line on site TQWN: WAKEFIELD A. Site WA-6 B. Size - Approximately 230 acres C. Current Status 1) Existing Land Use: Forested Lands 100% 2) Zoning Status: No Zoning D. Land and Water Resources 1) Land Capability: Excellent - 95% 2) Adjacent to surface fresh water Yes Fair - 5% Distance adjacent (Pine River Pond) 3) Adjacent to Aquifer Yes Distance - on site Eq Utilities and Services 1) Distance to nearest major water hookup 3.75 miles What- town(s) does thi's hookup serve - Wakefield 2) Distance to nearest sewer hookup - 8.75 miles What town(s) does this hookup serve - Wolfeboro 3) Utilities Available; Distance to nearest major transmission line 10.2 miles Type of transmission line - 33 KV 4) -Gas-Pipeline; Distance--to--near-est-gas-main - 18.5-miles- F. Transportation Highway; Type of road which services or is nearest to site secondary (State Highway 153) Distance to primary road - 1.1, miles (State Highway 16) 2) Railroad; Site serviced by rail - Yes Distance to active rail line on site TOWN: WAKEFIELD A. Site - WA-7 B. Size - Approximately 410 acres C. Current Status 1) Existing Land Use: Forested Lands - 95% 2) Zoning Status: No Zoning Open/Uncultivated - 5% D. I-and and Water Resources 1) Land Capability: Excellent - 85% 2) Adjacent to surface fresh water No Good - 5% Distance .05 mile (Stump Pond) Fair - 10% .15 miles (Pine River Pond) 3) Adjacent to Aquifer Yes Distance - on site E. Utilities and Services 1) Distance to nearest major water hookup 4.5 miles What town(s) does this hookup serve - Wakefield 2) Distance to nearest sewer hookup - 9.75 miles What town(s) does this hookup serve - Wolfeboro 3) Utilities Available; Distance to nearest major transmission line 10.3 miles Type of transmission line 33 KV 4) Gas Pipeline; Distance to nearest gas-main 19.25 miles F. Transportation 1) Highway; Type of road which services or is nearest to site secondary (State Highway 153) Distance to primary road - 2.2 miles (State Highway 16) 2) Railroad; Site serviced by rail - No Distance to active rail line .8 mile TOWN; WAKEFIELD A. Site - WA-8 B. Size - Approximately,230 acres C. Current 'Status 1) Existing Land Use: Forested Lands 100% 2) Zoning Status: No Zoning D. Land and Water Resources 1) Land Capability: E-xcel-lent - 65% 2) Adjacent to surface fresh water --No Good - 35% Distance .7 miles (Stump Pond) 3) Adjacent to Aquifer - No Distance - .75 mile E. Utilities and Services 1) Distance to nearest major water hookup 5.5 miles What town(s) does this hookup serve - Wakefield 2) Distance to nearest sewer hookup - 10.75 miles What town(s) does this hookup serve - Wolfeboro, 3) Utilities Available; Distance to nearest major transmission line 10.0 miles Type of transmission line - 33 KV 4) Gas Pipeline; Distance to nearest gas main 20.0 miles F. Transportation 1) Highway; Type of road which services or is nearest to site -,secondary (State Highway 153) Distance to primary road - 3.2 miles (State Highway 16) 2) Railroad; Site serviced by rail No Distance to active rail line 2.0 miles 0, lop- DATE DUE: Nf C[I@ Al @j V IEN 3 6668 14108 0822