[From the U.S. Government Printing Office, www.gpo.gov]
TORM WATER MANAGEMENT "V1 PLAN FOR THE TOWN OF COASTAL ZGN E M KILL INFORMATION CE, J.Eq DEVIL . . . ................ ... .a, . . ..... . HILLS DARE CO., NORTH CAROLINA R -7 lw- LL TD 665 lJ *Nam .N6 S7 1983 --- Im, V@ f4d 141% McDOWELL a ASSOCIATES,RA. Post Office Box 391 303 E. Main Street, Suite a Elizabeth City, N. C. 27909 MAY 1983 THE PREPARATION OF THIS REPORT (HAPS) WAS FINANCED IN PART THRU A GRANT PROVIDED BY THE NORTH CAROLINA COASTAL MANAGEMENT PROGRAM THRU FUNDS PROVIDED BY THE COASTAL ZONE 14ANAGEMENT ACT 1972 AS AMENDED WHICH IS ADMINISTERED BY THE OFFICE OF COASTAL ZONE MANAGE- MENT NATIONAL OCEANIC.ATMOSPHERIC ADMINISTRATION. STORM WATER MANAGEMENT PLAN FOR THE TOWN OF KILL DEVIL HILLS NORTH CAROLINA Prepared by: McDowell & Associates, P.A. Engineers-Surveyors Box 391 Elizabeth City, N.C. May 1983 TABLE OF CONTENTS Section Pages I. Introduction 2 ii. Existing Physical Characteris tics 5 1. Topography 2. Climate 3. Soils III. Inventory of Existing Facilities ra IV. Design Criteria and Standards 3 V. Recommendations, Costs, and Priorities 2 Appendix Figure A: Map - Existing Drainage Facilities, Problem* Areas., and Proposed brainagel-mprovemients Back Packet Figure B: Photo Index 4 Figure C: Photographs 18 Figure D: Summary of Problem Areas with Proposed Solutions 14 Figure E: References 2 STORM WATER MANAGEMENT PLAN INTRODUCTION: During the time this report has been prepared from September, 1982 to May 1983 there have been numerous rainfalls which due to their accumulative affect have accented potential drainage problem areas that have been dormant for some time'. In the last 20 years there have been no major storm events (hurricanes) and the last 5-10 years have' been relatively dry permitting the ground water in the area to lower. This dry-period.has permitted infiltration of rainwater to be maximized and helped to minimize the potential-detrimental*effects of poorly-maintained drainage systems. This situation also tended to encourage deve lopments with no formal drainage systems; ie, all drainage would be vertical or infiltrate into the sand as.op'posed to draining into a ditch or pipe system which in turns flows to a positive outlet to the Sound or Ocean. The purpose of this plan is to evaluate these problems as well as accomplish the f ollowing objectives: 1. To identify current surface water drainage problems. 2. To anticipate future drainage problems in Kill Devil Hills. 3. To help guide growth in an orderly manner consistant with the Town's Land Development Plan. 4. To help prevent the loss of life and property as the result of drainage problems.. 5. To help reduce existing and future maintenance and capital cost for the necessary storm.water drainage systems-in and around the Town. 6. To help coordinate associated regulations as soil erosion and flood plain management. 7. To assist the Town to set up cooperative agreements with the North Carolina Department of Transportation .@.(N.C.D.O.T.) in protecting and maintaining the area.s drainage system. This data has been generated through collation of the follow- ..ing-sources: 1. Ground topographic surveys and photographs. 2.' Aerial photographs. 3. Interviews with Town officials, North Carolina Depart- ment.of Transportation. officials, local Soil Conserva- tion Service officials, Corps of Engineers, and local citizens. 4. Existing Coast and Geodetic.mapping. 5. Flood Insurance Rate Map; U.S. Department of Housing and Urban Development. 6. Weather Bureau data from U.S. Department of Commerce (N.O.A.A.) 7. Hydrological and hydraulic analysis based on standard engineering.procedures.. 8. Current Town ordinances, planning documents and standards. 1-2 II. EXISTING PHYSICAL CHARACTERISTICS 1. TopographicFeatures: The Town of Kill Devil Hills is located.on the Outer Banks/ Barrier Islands of North Carolina. It is bounded on the east by the Atlantic Ocean an on the west by the Roanoke Sound. E leva- tions range from sea level to 60 feet above in the-Nature Conservancy Woods area. The more common elevations tend to range from eleva- tion 5 to 12. There are.two primary dune systems which*affect the drainage patterns within..the Town. The primary dune line along-the Ocean and east of U.S.-158 business requires special pipe systems on piles and flap gates to permit drainage to the Ocean. The dune line west of U.S. 158 Bypass or along the Sound creates problems for ditch or pipe systems which must be cut through it to drain low.areas behind or east of this dune line. These problems relate to depth of cut and stabilizing and maintaining ditches from wind blown sand. 'The two major north-south roads - U.S. 158 Business and U.S. 158 Bypass provide obstacles also because the normal drainage outlets must flow east to the Ocean Outfalls or west to the Sound and therefore must go under these two roads. Due to the flatness of a large part of the land between the two dune structures.and the high groundwater table in poor soil areas, large ditches with very flat slopes are required to be built to drain these areas. These ditches are typical of the backbone drainage system for drainage north and south be- tween U.S. 158 business and bypass as well as the Sound out- lets at the north end of Town and west of U.S. 158 bypass. 2. CLIMATE The area enjoys a-maritime climate with cooler summers and warmer winters than are-to be found on the mainland. Weather data for the region is provided by the U.S. National Oceanic and Atmospheric'Administ-ration (NOAA) at Cape Hatteras, approxi.mately 50 miles south of Nags Head. General climatic conditions in the study area'are closely approximate to'.those at Cape Hatteras except that annual precipitation is slightly less. Rainfall at Hatteras, with an annual mean of 55.07 inches, is. five inches-more than annual rain fall at Bodie Island. The wettest months are normally July and August, when there is a monthly average of nine days with thunderstorms. The mean annual temperature at-Hatteras. is 61.4 degrees F. -The prevailing winds blow from the northeast in fall andwinter, and from the southwest in spring and summer. Hurricanes are fairly frequent along the Outer Banks., and occur mainly in August and September. Average annual runoff in the area is about 14 inches. Evapotranspiration average about 36 inches, and ground water discharge is.about .5 inches. 11-2 Flood levels for Kill Devil Hills are 8.2 feet for a 50 year storm and 8.8 feet for a 100 year storm. Investigations relating to flood insurance studies show that overwash of the island by ocean tides would be sufficient to cause a-100 year flood level on the Sound shore equal to the. static ocean level. 3. SOILS The soils in.Kill Devil Hills play an important role.in the nature of the storm water drainage system. The soil has a tremendous capability to detain and retain surface water run- off. The sandy soils also have the.capability of neutralizing conventional underground storm sewer systems and ditches, be- cause of its ability to wash and blow into the systems creating a perpetual maintenance problem. A -typical profile of soil units in Kill. Devil Hills looks as follows: Location Soil Unit Depth Perm. Use Frontal dune Beach-foredune assoc. 0-61 Rapid' Wevere Beach road east Newhan fine 61 VRapid Slight and between Newhan Corolla (See qualification) highways Duckston fine sand 0-2' VRapid Severe Bypass west Duneland 61 VRapid Severe Duckston fine sand (see above) Newland fine sand (see above) Corolla fine sand 0-3' VRapid Severe Soundside Carteret soils 0-3' Rapid VSevere 11-3 (note: "Depth" refers to.depth to seasonal high water table; "Perm." refers to premeability; 'Use" refers to suitability for septic tank and filter field; "T' before Rapid and Severe means "very"). Two soils which create drainage problems because of their high ground water are.Corolla-Duckston-complex and Duckston Fine Sand. They are,characterized below and are shown on the map-in Figure A. Corolla-Duckston Complex This mapping unit occurs on nearly. level to slightly depressional areas that commonly lie just inland.from the frontal dune. The Duckston soils are in the wetter, slightly lower -depressions. The seasonal.high water table is at or- near the surface during the wet periods., Most of this com- plex is made up of the Cor olla.'soils. B. Duckston Fine Sand The soils are-poorly drained. The soils are sandy through- out. They occupy the nearly level to slightly depressional flats that extend inland from the frontal dunes. Also, they are in the small, irregularly shaped depressions between the Corolla and Neiqhan soils. They arerated severe for most uses due to wetness and poor fi ltering capacity. Water tables are 1'. 0' 2.-0' . 11-4 Another observation that should be made at this.point is the impact of the soils on storm water quality. As.reflected above the soils are typically permeable down to the water table; in fact, to the extent'that they do not provide appropriate filtering characteristics for septic,tank nitrification fields. The significance of this characteristic is that the local Health Department is requiring a 25 foot buffer between the drain field and ditches. A regional sewage collection and treatment system -would alleviate this problem but would tend to aggrevIate the drainage problem. Development density would probably increase and generate more storm water runoff due to.the increase in im- pervious area. Proper planning and regulation will need to be implemented to prevent this potential drainage problem from occuring. 11-5 III. INVENTORY OF EXISTING FACILITIES The purpose of this section is to identify the major drainage features which influence the drainage capabilities of the-land within the corporate limits of the Town, To assist in presenting this data we have provided one map (figure A), photographs (figure C).as well as a table (figure D) with a summary of problem areas prioritized and preliminary cost estimates for major items. In-general the co nveyance of stormwater in Kill Devil Hills is predominately by ditches and corrugated metal pipe culverts with few conventional. long storm sewer systems. Due to the two dune systems and'flatness mentioned earlier the natural drainage is either vertical or to a general low area between U.S. 158 business and bypass where the existing north south'ditch system is located. Some areas north of the Town's Municipal Building and west of U.S. 158 bypass have natural drainage to the Sound. These areas are basically along the Sound or west of the dune system. The map (figure A) shows problem areas, photographed areas, major drainage systems, and problem.soil areas. An attempt has been made to approximate drainage areas without topographic mapping..:[email protected] areas have been given designations with "S" or "0" prefixes with numbers:.,. The prefix "S" means that this apparent drainage area flows overland into 'a ditch or-pipe system that flows to the Sound. The "0" prefix means the outlet is an-ocean ou tfall.. For the most part 'the positive drainage,that exists now has been developed through the construction of ditches since the natural topography does not provide continuous swales or-low areas which-.drain to the Sound or Ocean. In a sense the drainage has been artifica'lly developed by man with the location normally within existing low or wet soil areas. There are three e-xis-ting outfalls which drain the a rea-6f Town south-of the Kill Devil Hills Post Office. The.rest of he Town that has positive.drainage drains to the Sound through 4 sound outlets of various.sizes with the.two primary outlets being the canal in S-8 and the Bickett Street ditch draining S-1 which includes-the Avalon Beach area. The problems that we'ha-ve define@a usually fall into two .major categories. One category,is lack of maintenance on exist- ing systems and the other' ca .tegory relates to poor drainage because no f(ormal'system has ever been constructed in that area. We have provided numerous examples of-each category in figure B,C and figure.D. The area which has received probably the most public attention is the area around the fresh water pond at the southern Town limits. In fact the pond straddles the'Kill Devil Hills/ 111-2 Nags Head Corporate Limits. A combination of generally dry weather for the past 10 years and the use of the pond as a potable wa ter source had lowered-the pond level and the com- panion watertable adjacent to it to permit a "drying.out" o-f soils which have historically been categorized as potentially wet soils. When-the wet weather returned this year along,with the discontinuation of the use of the pond as a water source, the watertable rose to its normal historical high level eleminat- ing vertical drainage and causing ponding on the ground surface within the'subdivisions that had been de.veloped-in this area. Because of the large area involved and no positive outlet to.service this area, ponding remained for an extensive period of time. The relationship of*some of the homes to the streets have also aggrevated the problem-because their ground elevation and finish floor elevation are lower than the streets, therefore water runs off the streets into their yards and homes with no place to go. Even with sta ndard roadside swales some yards will need to be filled to permit them to drain to a positive outlet. Besides-the Ocean Acres area there are numerous other areas as shown on the map which suffered from ponding due to high watertables in soils which have typically been described as potenti- ally wet soils by the SCS. In partiuclar Avalon Reach area in the "S-1" basin and a number of the problem areas west of U.S. 158 Bypass and north of the Town's Municipal building. The severity 111-3 of these problems were mitigated'by either. no..one.living.in*,.the homes or the area being sparsely developed during the-major flooding period. One primary co ncern is the effect on the septic tank systems. Lack of,drainage and/or high grounid,water conditions can compromise the septic tank system and therefore create health problems. While Ocean Acres does not have septic tank' systems concern for.excessive water*.entering the sewage collection system must be dealt -with. Ocean outfalls.if properly constructed function well, but if they are not built on piles and ektended above the ocean floor then they become a maintenance nightmare. Photo No. 50 shows an outfall properly. constructed just.north of the Sea Shore Shops. Problems of incorrect*construction are shown in photos 51. & 52 which reflectithemaintenance problems of the Baum St. outfall which typl*ifies the-problems of the outfall under Tanya's Ocean House also. Additional concerns relative to drainage include the impact of widening U.S. 15-8 Bypass and the accelerated deterio- ration of the@existing street.systems because of ponding water and saturated road subgrades. Historically developments a long the bypass have dumped their water into.the-right-of-way. See photos 45-48. Photos 33 and-34 show what happens when this 111-4 approach. is abused. When these areas fill up they become a traffic hazard and nuisance because there is no place for the water to drain. As development and widening increases along the bypass careful consideration must be given to -.d-.es:.i-gn prop,e-r drain- age outlets. Photos 39,41,42,&43 show the dramatic.impact poor drainage can have on road systems. A final comment on problems relates to adminiatrative proceduxes. Lack of coordination on development procedures standards, and *ordinance as well as a maintenance agredment:- with the-North Carolina Department of Transportation has hindered the orderly development of the drainage systems within the Town of Hill Devil Hills. In the past many of the facilities were installed to take care of current specific problems with- out regard to the comnunity as a whole or future development. Although some drainage systems are owned and maintained by the Town,-and others by the State Department of Transporta- tion, in many instances responsibilities for surface drainage facility construction and-maintenance are poorly defined or acted-upon, and therefore drainage p roblems remain unresolved. The rapid development of certain areas of the Town will intensify the surface drainage..problems in those areas.. Development of areas which were formerly permeable increases both the total runoff and the rate of runoff. This not only establishes the demand for additional storm drainage facilites in the developing areas, but may well place a burden on the areas at the end of the system. In many cases, this extra burden'may increase the volume. to a point which exceeds the capacity of those areas. As always, the correction of con- ditions is far more expensive than the cost of a properly planned and designed system based not only on the immediate needs, but also potential future growth.. 111-6. IV. STORMWATER DRAINAGE DESIGN AND CONSTRUCTION CRITERIA The following data outline s procedures for establishing appropriate design and construction guidelines within the Town. 1. The developer shall provide a drainage system for the proper drainage of all surface water using t he approved design criteria.as-stated in the following paragraphs below. The design of such a system shall be subject to the approval of the Town pursuant to these guidelines and to the North Carolina Department of Transportation when the proposed drainage system affects drainage coming from or going into the State's Right-of-Way. 2. All surface water draining onto the site under develop- ment or generated on said site must be provided for in accordance with these guidelines. All water drainage leaving the site under development shall be channelled to points of approved.discharge, such as a.natural or manmade watercourse, a lake, pond, ditch or storm drainage system. 3. No surface water shall be channelled or directed into a sanitary sewer or septic tank system. Distances be- tween open ditches.and septic tank.isystems!must be specified and approv ed by the Dare County Sanitarian. This approval must be obtained by the developer prior to final approval of the drainage system designed by the Town of Kill Devil Hills. IV-1 4. The developer shall use retention, detention, and in- filtration techniques to reduce the runoff from his site. 5. The drainage design criteria for open and closed drain- age systems shall generally conform to these guidelines and Handbook of Design for Highway Surface Drainage Structures prepared by the North Carolina Department of Transportation, the A.S.C.t. Manual of"Engineering Practice No. 37, and Urban Hydrology for Small Water- shed-s (T.R. No. 55) prepared by the Soil Converstation Service. 6. Development plans shall show size, slope, invert and rim elevations, and ditch cross sections in the vicinity of-the development and as is necessary to properl' y evaluate the existing and proposed surface water drain- age system. 7.'Drainage calculations, drainage area maps, flood routing calculations, infiltration calculations, storm sewer @back water curve calculations, etc. shall be submitted to'the'Town upon request. -8.'Estimated runoff calculations may be computed by the Rational Method (Q=CIA), the SCS method in TR No. 55, or other approved methodologies. Si.z3'-'ng of structures will be base d on the Manning Equation. Culverts shall be evalua ted for inlet and outlet control as necessary. 9. Systems shall generally be designed for a 10 year storm IV-2 frequency. There may be some situations which may .warrant a different requirement due to the size of the .system. The design engineer is encouraged to contact the Town Engineer in the preliminary design stages to determine if a change is warranted. ..10. A'modified Rational Method hydrograph prccedur .e may be used in sizing retention and detention systems. 11. All underground storm sewers open drainage ways, and related structures shall be constructed to the appli- cable provisions of Roadway Standard Drawings_ and Standard Specifications for Road and Structures produced by the North C arolina Department of Transportation. 12. During the construction, preparation, arrangement and installation of improvements and facilities in develop- ments, the developer shall maintain each stream, creek, ditch, or channel. contiguous to or located within the sub- division in an unobstructed state and shall remove from such watercourses and the banks of the watercourses all debris l.ogs,:timber, junk and other accumulations that would, in time of flood, clog or dam the passage of-waters in their downstream course .. Installation of appropriately sized conduit, culverts, bridges or other required structures shall not be constructed in a way which will obstruct the flow of drainage. IV-3 V. RECOMMENDATIONS, COSTS,-AND PRIORITIES We have identified a number of drainage related problems within the Town of Kill Devil Hills. Solutions to these pro- blems require maintenance, new construction, coordination with D.O.T., S.C.S, and the creation of certain standards and ordinances. Specific problems in the field have been identified and proposed generalized solutions with preliminary cost estimate have been reflected in table figure D. We prioritized 13 of the major problem 'areas with the cost estimates not including utility conflicts or easement acquistion. Since these solutions are generalized, detail design.s would be needed to prepare plans and specifications as well as detailed cost estimates. The following table outlines the cross reference between the problem prior ity and the problem reference number on the map figure A and table figure D. Priority Map reference No. Priority Map reference No. 1 46 8 27 2 13 9 21 3 '1 10 16 .4 18 11 14 5. 23 12 15 6 35 13 17 7 19 V.- 1 In summary the following goals should be pursued: .1. Review the referenced field problems and set up the Town's priorities on corrective action using this report's*priorities as a guide. 2. Establish sources of financing for corrective action through property owner assessments, developer re- quirements, general taxes, joint venture arrangements with D.O.T., and mosquito control funds. 3. 'tstablish lin*es*of responsibilities for drainage maintenance and construction between'the Town and D.O.T. 4. Develop a. drainage ordinance. 5.1 Develop a storm water.-drainage design manual. v-2 FIGURE B PHOTOGRAPH INDEX A. SILTATION,TRASH, & RESTRICTIVE PEDESTRIAN CROSS-OVERS 1. Pedestrian Cross-over in N-S ditch causing trash build-up at Albemarle St. 2. Pedestrian Cross-over in N-S ditch (pipe undersized)(N. of Aycck St.) 3. Vegetation, trash accumulation at Memorial Dr. & Carolyn Dr. 4. Pedestrian cross-over in N-S ditch with undersized pipe (Pamlico St.) B. TYPICAL PONDING PROBLEMS DUE TO-AREAS-WITH:SOILS WHICH HAVE POOR VERTICAL DRAINAGE AND/OR NO COVENTIONAL DRAINAGE OUTLET. 5. Fresh Pond overflowing banks- and flooding "Ocean Acres Subdivision". (Date: 4-1-83) 6. Ocean Acres Drive west of Bell Ave. (Date: 2-15-83) 7 "0cean Acres" Copley Dr. at Richard Klein's residence (Date: 2-15-83) 8. "Ocean Acres", Copley Dr. at Richard Klein's residence (Back yard is adjacent to the Fresh Pond.) 9. Ocean Acres; Sawin Residence on Ocean Acres Dr. (date:-4-1-83) 10. Ocean Acres; Resident installed a Dike System around house (See Photo #13) 11. Whispering Pines; Quail Lane at Helen Dr. (Date2-15-83) 12. *Whispering Pines; Quail Lane and Goldie St. 13. "Ocean Acres"; outlet for Dike System (See Photo #10). 14. Septic Tank draining into outfall ditch (Hardin St.. & Fourth St.) 15. `Avalon Beach"; Blocked ditch south of Wilson St, (See Photo #18) 16. Fill material in ditch just upstream of Tanya's Ocean outfall. 17. "Avalon Beach "; Ponding north of Charlotte St. (Date:2-15-83) (B-1) 18. Fill Material in ditch just upstream of Tanya's Ocean outfall. (See Photo #16) 19. Inlet to existing Ocean outfall at Tanya's Ocean House. 20.. Ponding at intersection of Helga & Raymond Ave. 21. Residence on East side of Apache Dr. (Date: 4-11-83) Residence of West side of Indian Dr. 23. Archdale St. West 24. Seminole St. North 25. Suffolk St. at intersection of Newport News. 26. White Court (Cul-de-sac) 27. Durham St. at-intersection of Portsmouth St. 28. Arch St. looking East across Susan Dr. C. TYPICAL- PONDING PROBLEMS ALONG RTE. 158 BUSINESS & RTE. 158 BYPASS 29. Flooding 158 Business, (outfall buried by Northeast storm; (2-15-83) 30. Flooding 158 Business (outfall buried by Northeast storm. 31. Ponding West of Rte. 158 Business at "Jolly Roger". 32. Flooding on 158 Business in area of Third St. to Fifth St. (Date: 2-15-83) 33. East of Rte. 158 Bypass at "Seagate North". 34. West of Rte. 158 Bypass at South end of Kill Devil Hills (McDonalds). D. TYPICAL MAJOR DITCH SYSTEM IN KILL DEVIL HILLS 35. Existing North-South Drainage ditch North of Aycock St.. 36. Drainage ditch in area of Kill Devil Hills Town Hall Bldg. E. TYPICAL DRAINAGE RELATED PROBLEMS OTHER THAN PONDING 37. Buried pipe culvert under Rte. 158 Bypass at Durham St. 38. Erosion, silt, & pavement damage at Wilkinson St. & Virginia Dare Rd. (B-2) 39. Pavement deterioration of Baum St. due to failing pipe joints. 40. Poor planning/utility conflicts with drainage from Kentucky Fried Chicken parking lot. 41. Erosion, broken pavement, pavement deterioration at Third St. 42. Pavement deterioration at Third St. in area of the lake. 43. Pavement deterioration on Wilkinson St, west of Bypass. 44. Pipe culvert damaged during clean-out under Fifth St. west of Bypass. F. COMMERCIAL DEVELOPMENT-ALONG.RTE..158-BYPASS 45. Barnes St. (Nags Head) 46. Barnes St. (Nags,Head) 47. Xypical drainage into U.S. Rte. 158 Bypass right-of-way. 48. Carolyn Drive (McDonalds) 49.. Residential development along Rte. 158 Business on north end of beach. G. OCEAN OUTFALLS 50. Existing 24" RCP on piles just north of "Seashore Shops". 51. Existing 30" CMP at Baum St. being uncovered by D.O.T. (2.-16-83) 52. Outlet of 30" CMP at Baum St. aft*er'opened up by D.O.T. (2-16-83) 53. Typical ocean outfall plan; bents & layout 54. Typical, ocean outfall plan; manhole & flapgates. H. [email protected] V-1 @LNG AND CONTROLLING DRAINAGE/RUNOFF 55. Turfstone Paving allowing infiltration at "The Windmill" 56.. Grading to infiltration pond/area; Guy-C. Lee, Kitty Hawk. 57. Grading to infiltration trench; Nags Head Shopping Center.U./C. 58. Shoulder stabilization with stone; Wrightsville Ave., Nags Head. 59. Infiltration trench specifies. (B-3) 60. Slotted drain allows surface water through top as well as through inlet. 61. Asphalt paving around pipe culvert outlet reduces erosion & siltation. 62. Simple but effective drop structure reduces erosion. 63. Sand fencing reduces wind blown sand and erosion. (B-4) FIGURE C ."PHOTOGRAPHS" NOTE: Numbers on photographs are referenced to map (Figure A) in back packet, and Photograph Index (Figure B) 2_1 . .... . . ......... ------ ------ 191 A"W(- 40-1",96* 47 (C- 1) "Lim fit. -40 14 41 "Ot .14 OD @ 7-cl, I 14 Ov '"owl IN* At@-, @na 40@ (C-3) 14, IT' W'IW-: I A iX '"Pam or v a R t I 15] (C-4) RoA 17 bi oi- Lu N4 411*11 777@ 23. -loc 10 4C. 4i@ 27 lu-A&Z 71 ,14, AW - IA I_lr im- I Jill 41 MV, Ab ra ,'kl L4&' Arr'. el' 4.1 7W el 1A 4.v -Alm 4- 44-@ 45. 47 lw IL 74 INV, 4"W4, M-1 51. TYPICAL OCEAN OUTFALL- ZZ /0 rnver@ El. Gu Stu _ax r---- ;j 11 77 O'rven S*u/ sfi'@P I I wA U'datara@ca. CA@ Nkoq 'W@Vvp 0@ P'Aj a-?j.4'hS'd'U IIA Z)'f 2@4 z 0)- Z' AJ 7--@ F 53] Details taken from Ocean Outfall No. 3 Drawiug B@- Bridge Maintenance Department, N.C. State Highway-Commission, Raleigh, N.C., File No.6728, Date April 1964. (C- 14) TYPICAL OCEAN OUTFALL B ax 14@ C-'V. I-L,9,u 0,- H,9A1HQLF -4 b, bi Aap 4"'s ^4'b" -r 0 .4J @5 a F 54] Details taken from Ocean Outfall-No, 3 Drawing By Bridge Maintenance Department, N.C. State Highway Commission, Raleigh, N.C. File No.6728, Date April 1964. (C-15) oe-; (C- 16) FINISH GRADE ELEV. 9.0 SELECT D BACKFILL LZ BUILDERS FELT ELEV. 6 0 6" PEA GRAVEL 2.50 CU. FT./L.F 6. 2- PER FT OF DEPTH 3.53 CU. FT./L.F PERFORATED 3.97 CU. FT/L.F. PIPE DESIGN WATER 3.53 CU. FT/L.F. TABLE ELEV. 2.5' ELEV. 2.0 2.50 CU. FT/L.F hpCOARSE ROCK PER FT OF DEPTH 5. NOTE, VOLUMES ARE COMPUTED BASED ON 50% VOIDS IN ROCK BACKFILL I INCH 25.4 Mm I FOOT 0.305 M I CU. FT. - 0.02 8 M3 DETAIL SHOWING VOLUME OF STORAGE IN INFILTRATION TRENCH (COURTESY OF BRISTOL, CHILDS & ASSOCIATES, CORAL GABLES, FLORIDA) lapp- w J.- wz@ 71 kPE @ 36 PERFORATEO P, P; E (C-17) 77, (C-18) FIGURE D SUMMARY OF PROBLEM AREAS WITH PROPOSED SOLUTIONS DRAINAGE PROBLEM DESCRIPTION OF PROBLEMAREAS PROPOSED SOLUTIONS TO PROBLEMS BASIN REF. NO. PONDINGIN AREAS OF SOILS WITH POOR CONSTRUCT 470Q'� OF BASE DITCH, (MOST IN SEA- (Photos. 23 VERTICAL DRAINAGE FROM INTERSECTION VIEW AVE. R/W DUE TO BEING LOWEST AREA AND ALSC 28,43) -'OF ARCH ST. & SUSAN DR. TO EDEN ST. UNIMPROVED), STREET CROSSING CULVERTS,MINOR (PRIORITY NO. 3) ROADSIDE SWALES TO REACH BASE DITCH.,STREET PATCHING5 SEEDING & EROSION CONTROL AND ENGINEERING & CONTINGENCIES= $7.50 x 4700'�= $32.1250* 2. PONDING AT STREET INTERSECTION OF INSTALL CULVERTS UNDER STREET TO DRAIN INTO A HELGA ST, & RAYMOND AVE. PROPOSED ROADSIDE SWALE TO THE NCiRTH-SOUTH" Photo-20) _'_D ITCH@__ WEST.-- OF ._-PONDI NG 3. SILTATION OF N'ORTH-SOUTH (N.-S.) CLEAN-OUT TO CORRECT ELEVATION; IN.THIS AREA AT THE N.-E. CORNER OF "SEAGATE THE N.-S. DITCH NEEDS TO HAVE VEGETATION & NORTH" BLDG. TRASH REMOVED FROM ARCH ST. SOUTH TO WILKINSON ST. CULVERT. 4. PONDING ON PARKING LOT & 158 BYPASS USE SWALES AND/OR CULVERTS AT ENTRANCES TO (Photo 33) R/W AT- SEAGATE NORTH SHOPPING BYPASS, DITCH TO NORTH END OF PARKING LOT., THEd, CENTER. DITCH EAST TO THE N.-S. DITCH. (SOILS IN BETWEEN ENTRANCES TO BYPASS DO NOT DRAIN WELL VERTICALLY.) 5. PONDING AT INTERSECTION OF INSTALL PIPE CULVE.T DRAIN TO RT AT INTERSECTION> WILKINSON ST.: & 158 BUSINESS. N.-S. DITCH. WITH A DITCH..ON THE SIDE OF WILKINSON ST. THAT HAS THE LEAST UTILITY CONFLICTS. (D-1) FIGURE D' SUMMARY OF PROBLEM AREAS WITH PROPOSED SOLUTIONS DR@[NAGE' PROBLEM DESCRIPTION OF PROBLEM AREAS PROPOSED SOLUTIONS TO PROBLEMS -BASIN REF. No. S-1 6. EROSION,, SILTATI'ON,.& PAVEMENT CONCENTRATE.ST13EET RUN_QFF TO ONE POINT OF DAMAGE AT HEADWALL ON WILKINSON*ST RELEASE WITH ASPHALT CURBlNG,, THEN USE EITHER (Photo 38) (N.-S. DITCH). A CONCRETE CHUTE TO INVERT OF DITCH ('OR SOME TYPE OF SOIL REINFORCEMENT MATTING). 7. INLET & OUTLET ENDS OF C,ORRUGATED REPAIR OR REPLACE; CRUSHED ENDS RESTRICT METAL PIPE CRUSHED. MAJORITY OF FLOWAT THIS POINT. 8. PEDESTRIAN.CROSS-ING JUST NORTHIOF -EITHER REMOVE FILL AND SMALL CULVERT, OR (Photo 2) AYCOCK ST.; SMALL CULVERT RESTRI=E INSTALL PROPER SIZE CULVERT BASED ON DOWN- FLOW, CAUSES TRASH BUILD-UP AT STREAM SIZE. (USING WOODEN BRI.DGES WOULD NEED INLET END OF PIPE.' LESS MAINTENANCE & WOULD NOTRESTRICT DRAINAGE.) 9. PONDING AT INTERSECTION OF AYCOCK INSTALL A PIPE CULVERT UNDER AYCOCK ST., AND ST'.' &.158 BUSINESS. DITCH TO THE N.-S. DITCH ON THE SIDE OF AYCOCK ST. WHICH HAS THE LEAST UTILITY CONFLICTS. 10. PONDING EAST OF BYPASS IN LOW DITCH EAST TO THE N.-S.DITCH. MARSHY AREA BETWEEN.ARCHDALE ST. &. AYCOCK ST..(THIS AREA'S SOILS HAVE POOR VERTICAL DRAINAGE.) PONDING ON EDEN ST. BETWEEN 158 FILL & GRADE STREET WITH A CROWN; SWALES ALONG BYPASS AND BUSINESS RT. 158. EDGE OF SHOULDER TO CARRYREMAINDER OF PONDING TO THE N.-8. DITCH. (D-2) FIGURE D SUMMARY OF PROBLEM AREAS WITH PROPOSED SOLUTIONS )RAINAGE PROBLEM DESCRIPTION OF PROBLEM AREAS PROPOSED -SOLUTIONS TO PROBLEMS BASIN REF. NO. S-1 12. PONDING EAST.OF 158 BUSINESS IN THERE TS NO CLOSE, CONVENIENT OUTLET FOE THIS AREA OF "K.D .H. MANOR",MOTEL. PONDING. CONSIDER USING INFILTRATION TRENCH AND/OR A PERMEABLE SURFACE WHERE WATER PONDS, SUCH AS "TURFSTONE". 13. "AVALON BEACH" AREA; RTE. 158 AS OF APRILi 1983,-A DETAILED DRAINAGE PLAN IS BYPASS TO 158 BUSINESS FROM-DURHAM BEING-DONE WHICH WILL BASICALLY ACCOMPLISH THE 'Photos 15, ST.'TO BICKETT ST. OUTFALL DITCH.- FOLLOWING THINGS-, 17) PONDING ON STREETS & YARDS DUE TO PROVIDE MAINTENANCE ON THE EXISTING NO-DRAINAGE SYSTEM.IN SOME AREAS. -_DITCHES & PIPES CHECKING THE NEED FOR AND WHERE A SYSTEM EXISTS IT HAS REPAIR AND/OR REPLACEMENT. EXTEND THE NOT-BEEN PROPERLY MAINTAINED. EXISTING SYSTEM SOUTH TO CHARLOTTE ST. MAJORITY OF AREA HAS SOILS THAT WITH PIPE, AND IMPROVE THAT DRAINAGE DRAIN POORLY VERTICALLY. ALSO, ALONGSIDE THE STREETS BY USING A COM- SEWAGE DISP09AL IS BY INDIVIDUAL BINATION OF ROAD51DE SWALES, GRADED SEPTIC TANKS NECESSITATING A WORK- ENTRANCES DRIVES, 'AND POSSIBLY SOME ING SURFACE WATER DRAINAGE SYSTEM. ENTRANCE CULVERTS. CSOME MINOR FILLING (.PRIORITY NO. 2).- IN SMALL . LOW AREAS MAY BE MORE COST EFFECTI-VE THAN SWALES & CULVERTS.) S-2 14. PONDING FROM HAYMAN BLVD.. TO ROADSIDE DITCHES THROUGH "WET" AREAS, WILKINSON"ST.*AND FROM LEE AVE. ENTRANCES -:CUTS & CULVERTS2 ASPHALT PATCHING ENGINEERING & WEST TO BAYVIEW DRIVE. SEEDING & EROPI'ON CONTROL, (PRIORITY No. 11) CONTINGENCIES - $12,528., (D-3) FIGURE D SUMMARY OF PROBLEM AREAS WITH PROPOSED SOLUTIONS ;DR@[NAGE PROBLEM DESCRIPTION OF PROBLEM-AREAS PROPOSED SOLUTIONS TO PROBLEMS BASIN REF. NO. .S-3 15. PONDTN@w ON SUFFOLK ST. FROM NORFOLK ROADSIDE SWALES TO CROSS PIPES UNDER NEWPORT (Photo 25) ST. TO SMITHFIELD ST. NEWS & SUFFOLK ST., CROSS PIPES UNDER AVALON (PRIORITY NO. 12)- DR. & KITTY HAWK DR., CONCRETE DRIVE CUTS, CULVERTS OR.GRADED SWALES FOR DRIVES, SEEDING & EROSION CONTROL & ENGINEERING AND.CON- TINGENCIES - $12,318. S-4 16. PONDING ON SUFFOLK ST. FROM YORK- LOWER-EXIST. DITCH ALONG-REAR PROPERTY LINES TOWN ST. TO PORTSMOUTH ST. (SOILS EAST TO.YORKTOWN ST., INSTALL CROS,S-DRAIN AT IN THIS AREA HAVE POOR VERTICAL SUFFOLK ST. & PORTSMOUTH ST. INTERSECTION, DRAINAGE). CONSTRUCT ROADSIDE SWALES WITH EITHER GRADED (PRIORITY NO. -10) CONC. ENTRANCES OR CULVERTS, SEEDING & EROSIONI CONTROL.'ENGINEERING & CONTINGENCES =,$17.,244. S-5 17. PONDING DOCK ST. & PORTSMOUTH ST. ROADSIDE DITCH ALONG DOCK ST., CROSS-DRAINS ATi INTERSECTION. PORTSMOUTH ST., EDENTON & BAY DRIVE, ASPHALT ' (PRIORITY NO. 1-3)- PATCHING ON STREETS, SEEDING & EROSION CONTROL,' ENGINEERING AND CONTINGENCIES = $7,956. S 6 18. PONDING AT INTERSECTION OF DURHAM LOWER THE EXISTING CULVERT UNDER BAY DRIVE ANDI: (Photo 27) ST. FROM PORTSMOUTH TO EDENTON'ST. DITCH FROM SOUND EAST TO HAMPTON ST. (DITCH (THIS AREAS SOILS HAVE POOR VERTI- WOULD NEED TO BE PIPED FOR 100' ON SOUND SIDEI CAL DRAINAGE) OF BAY DR. DUE TO A NEW HOME ENCROACHING ON (PRIORITY NO, 4 EXIST, DITCH.) INSTALL CROSS-DRAINS AT INTER- SECTIONS OF DURHAM & EDENTON, FIFTH ST. & LISAI COURT, AND DRAIN'TO THESE WITH ROADSIDE SWALESI MISC. ENTRANCE DRIVES WOULD NEED CULVERTS OR SWALES ON SURFACE TO REACH CROSS-DRAINS. ALL DISTURBED AREA TO BE SEEDED & EROSION CON-. TROLLED PLUS ENGINEERING'AND CONTINGENCIES (D-4) $163530. FIGURE D SUMMARY OF PROBLEM AREAS WITH PROPOSED SOLUTIONS DRAINAGE PROBLEM DESCRIPTION OF PROBLEM AREAS PROPOSED -SOLUTIONS TO PROBLEMS BASIN REF. NO. S-7 19. PONDING SEMINOLE ST. WEST TO BAY CONSTRUCT BASE DITCH FROM SEMINOLE ST. TO (Photos 21 &DRIVE FROM CROATA14 DR. TO INDIAN SOUND, ROADSIDE SWALES FEEDING BASE DITCH DR. (ENTRANCE CUTS WITH CULVERTS), CROSS-PIPES AT 22) (PRIORITY NO. 7) STREET CROSSINGS, ASPHALT PATCHING, SEEDING AND EROSION CONTROL., AND ENGINEERING & CON- TINGENCIES $4o,o8o., S-8 20. PONDING AT INTERSECTION OF DURHAM OPEN UP EXIST. CULVERT UNDER 158 BYPASS ON ST. & 158 BYPASS. NORTH SIDE OF DURHAM ST. (Photo 37) ITCH ALONG REAR PROPERTY LINES s-8 21. PONDING BETWEEN DURHAM & FIFTH ST. CONSTRUCT-A D FROM BYPASS TO SMITHFIELD ST. BETWEEN DURHAll & FIFTH ST., USE-'-k C13OSS-DRAIN AT DURHA ND M &-NEWPORT NEWS INTERSECTION A' ROADSIDE SWALES TO GET DRAINAGE INTO BASE DITCH. INSTALL A CULVERT UNDER DURHAM ST. ON WEST SIDE OF BYPASS (OR CONC. SWALE ACROSS DURHAM), DITCH TO TIE-INTO EXIST. DITCH JUST SOUTH OF DURHAM ST., LOWER EXIST. DOUBLE LINE CULVERT UNDER F@-FTH ST. (ONE ALREADY"-D'AMAGED) , AND LOWER DITCH To 4th ST. -_'8---E-'SDING & EROSION CONTROL AND ENGINEERING & CONTINGENGIES $105544. 22. 1-LINE OF EXIST. DBL. LINE OF 18 REPAIR OR REPLACE. CMP IS DAMAGED (BOTH PIPES NEED TO (Photo 44) BE LOWERED FOR PROBLEMS #20 & #21). (D-5) FIGURE D S@UMMARY OF PROBLEM AREAS WITH PROPOSED SOLUTIONS @DRkINAGE PROBLEM REF. NO. DESCRIPTION OF PROBLEM AREAS PROPOSED SOLUTIONS TO PROBLEMS BASIN .S-8 23. PONDING ON CLAMSHELL DR. FROM. CONSTRUCT A NEW DITCH FROM CREEK ST. TO THE SEMINOLE ST. TO WYANDOTTE ST. (THIS EXIST. RTE. 158 BYPASS DITCH, CROSS-DRAIN AT (Photo 24). AREA HAS SOILS WHICH HAVE POOR SEMINOLE & CLAMSHELL, ROADSIDE SWALES WITH VERTICAL DRAINAGE.) CULVERTS UNDER ENTRANCES, PAVEMENT PATCHING, (PRIORITY NO. 5) SEEDING.& EROSION CONTROL AND ENGINEERING & CONTINGENCIES $9,6oo. 24. PONIjING ON RTE.'158 BUSINESS FROM INSTALL A CATCH BASIN JUST SOUTH OF THE "JOLLY (Photos 31, THIRD ST. TO FIFTH ST. WHEN OCEAN ROGER". WITHAN OUTLET PIPE DRAINING TO THE 32,41,&:42) TOPS DUNELINE EAST OF BUSINESS RTE. POND WEST OF BUSINESS 158. USE PAVED ROADSIDE 158; WATE.RPONDS ON PAVEDAREAS SWALES (GRADED) TO DRAIN PONDED SURFACE WATER ALONG BUSINESS AFTER HEAVY RAINS'. TO NEW CATCH BASIN. ALSO,*(#25) TO REDUCE PAVE-L MENT DAMAGE ON THIRD ST. & DRAINAGE BACK-UP REPLACE EXIST. 12" PIPE WITH A NEW 19". THEN, 25. SMALL, BLOCKED 12"'UNDER THIRD ST. (#26) LOWER POND'OVERFLOW TO MATCH THE RESTRICTS DRAINAGE TO SOUND AFTER ELEVATIONS OF THE EXIST. BYPASS CROSS-DRAIN. A MAJOR N.-E. STORM-(OCEAN OVER .WASH)'.' 2 6.' EXIST. 181''POND OVERFLOW PIPE IS HIGH AND REDUCES THE AMOUNT OF STORAGE VOLUME THE PONDS COULD HANDLE IF LOWERED. (.D-6) FIGURE D SUMMARY OF PROBLEM AREAS WITH PROPOSED SOLUTIONS )RAINAGE. PROBLEM DESCRIPTION OF PROBLEM AREAS PROPOSED SOLUTIONS TO PROBLEMS BASIN REF. NO. s-8 27. PONDING IN'HARBOUR DR. & LANDING CONSTRUCT A BASE DITCH FROM EXIST. BYPASS DR. AREA. @CROSS-DRAIN AT ASHEVILLE DR. TO LANDING DR. & (.PRIORITY NO. 8) HARBOUR DR. INTERSECTION., CROSS-DRAINS AT ST. CROSSINGS, ROADSIDE SWALES WITH EITHER CULVERTS UNDER ENTRANCES OR GRADED TOP SUR- FACES, PAVEMENT PATCHING, SEEDING & EROSION CONTROL> ENGINEERING & CONTINGENCIES = $19,290. 28. VEGETATION IN BYPASS WEST DITCH PROVIDE REGULAR SCHEDULED MAINTENANCE. 'IMPEDES DRAINAGE FLOW-TO SOUND. 29.* PONDING EAST OF BUSINESS 158 IN INSTALL CATCH BASIN ON EAST SIDE OF BUSINESS FRONT OF THE "LAMPLIGHTER". 158 CROSS-DRAIN UNDER BUSINESS 158, DITCH TO THE EXIST. N.-S. DITCH. 3Q. PONDING ON SUTTON PINEHURST & ONE EACH STREET CONSTRUCT A SWALE ON SIDE OF ROANOKE AVE. STREET WITH NO UTILITIES, GRADING ENTRANCES OR!; USING CULVERTS INCL. ONE CROSS-DRAINUNDER MEMORIAL AVE. DRAINING TO N.-S. DITCH. S-8 31. PONDING ON FUTURE SITE OF "ZIP INSTALL CROSS-DRAIN UNDER OCEAN BAY BLVD. TO MART". DRAIN TO EXIST. BYPASS WEST DITCH_ (D-7) FIGURE D SUMMARY OF PROBLEM AREAS WITH PROPOSED SOLUTIONS DRAINAGE PROBLEM DESCRIPTION OF PROBLEM AREAS' PROPOSED SOLUTIONS TO PROBLEMS BASIN REF. NO. s-8 32. -'PEDESTRIAN CROSSINGS AT ALBEMARLE EITHER REMOVE FILL AND SMALL CULVERT, OR .(Photo 1,4) ST. & PAMLICO ST. RESTRICT DRAINAGI INSTALL PROPER SIZE CULVERT BASED ON DOWN- IN N.-S,. DITCH AND CAUSES TRASH STREAM SIZE. (USING WOODEN BRIDGES WOULD NEED BUILD-UP AT INLET OF SMALL PIPES. LESS MAINTENANCE VWCULD NOT RESTRICT DRAINAGE.) 33. PONDING EAST & WEST OF BUSINESS INSTALL CATCH BASIN ON EAST SIDE OF BUSINESS., RTE. 158--IN VICINITY OF "THE CROSS-DRAIN TOVEST SIDE, DITCH ALONG 158 TRADING POST". BUSINESS TO OREGON A E., THEN TO N.-S. DITCH V @ALONG OREGON AVE. 80ME PONDING COULD BE ELIMATED BY FILLING., BUT NOT ALL.) 34. PONDING EAST OF PIRATES LOOP & SWALE TO EXIST-. DRAINAGE DITCH CROSSING SOUTH OF LANDING DRIVE. LANDING DRIVE (,ON SOUTHSIDE). 35. PONDING EAST & WEST OF MONUMENT INSTALL A CROSS-DRAIN AT LOW POINT OF MONUMENTi LANE AT WHITE CULDESAC AREA LANE, THEN@DITCH SOUTH TO CANAL DRIVE WITH (Photo 26) (SOILS IN THIS AREA HAVE POOR CROSS-DRAIN THERE., ACROSS PROPERTY LINES TO VERTICAL DRAINAGE.) LANDING DR. TO LARGE CANAL. (ELEVATION (PRIORITY NO. 6) DIFFERENCE AT CANAL MAY NECESSITATE A DROP STRUCTURE.) (D-8) FIGURE D SUMMARY OF PROBLEM AREAS WITH PROPOSED SOLUTIONS DRAINAGE DESCRIPTION OF PROBLEM -AREAS PROPOSED -SOLUTIONS TO PROBLEMS BASIN REF. NO. s-8 36. PONDING ALONG LANDING DRIVE FROM USING CROSS-DRAIN AT HARPOON CT., DRAIN RUN- SEALOFT CT. TO SCHOONER CT. OFF TO NORTH SIDE OF LANDING DR. AND USING CULVERTS UNDER STREET APPROACHES & A SWALE DRAIN TO THE CANAL N.-.E. OF SEAGULL CT. 37. PONDING ON EAST SIDE OF CANAL USE CROSS-DRAIN UNDER FROELICH CT. & FIRST DRIVE SOUTH OF FIRST FLIGHT LANE. FLIGHT LANE TO DRAIN INTO EXIST. DITCH ON NORTH SIDE OF FIRST FLIGHT LANE. (,SOME EXIST. DRIVES WILL NEED CUTTING, CULVERTS5 & PATCHING.) 38.- PONDING NORTH & SOUTH OF DOGWOOD USE ROADSIDE SWALES WITH CULVERTS UNDER LANE INTERSECTION WITH DOGWOOD LANE AND TO DRAIN PONDING WATER TO CANAL. 39. EROSION AT EXIST. OUTLET (83" 57' USE CONC. DRAINAGE CHUTE FROM LOW POINT IN (Photo 62) CMP) ON FIRST FLIGHT LANE. PAVEMENT TO PREVENT,EROSION FROM STREET RUN- OFF. ALSO, ON EACH SIDE OF FIRST FLIGHT LANE ESTABLISH VEGETATION ON SLOPES. (TOPSOIL WILL NEED TO BE HAULED IN3 AS-EXIST. SAND WILL NOT SUPPORT VEGETATION.) 0-1 40. PONDING IN VICINITY OF KILL DEVIL DRAIN SOUTH ALONG NOR FOLK AVE. R/W TO EXIST. HILLS POST OFFICE. DITCH SOUTH OF GODDARD AVE. (D-9) FIGURE D SUMMARY OF PROBLEM AREAS WITH PROPOSED SOLUTIONS DR@INAGE OBLEM DESCRIPTION OF PROBLEM -AREAS PROPOSED-SOLUTIONS TO PROBLEMS BASIN REF. NO. ,0-1 41.- PONDING ON CLARK ST. & CORRIGAN ST DRAIN ALL 3 AREAS EAST TO BYPASS USING SWALES (CLAY STREETS) AND ALSO INTERSEC- &CULVERTS, DIG A NEW'BYPASS DITCH NORTH TO TION OF LANDING STRIP RD. & 158 THE EXIST. DITCH SOUTH OF GODDARD ST.2 BYPASS. INSTALLING CROSS-DRAINS AT STREET APPROACHES. 42. PONDING AT CORRIGAN ST. & ROADSIDE SWALES TO NEW CROSS-DRAIN AT INTER- WRIGHTSVILLE AVE. INTERSECTION SECTION DITCH EAST ALONG CORRIGAN ST. TO (CLAY STREETS). EXIST. N4-S.. DITCH. 43. P04DING ON CLARK ST., BETWEEN ROADSIDE SWALE TO N.-S. DITCH. WRIGHTSVILLE AVE. & BUSINESS RTE. 158'. 44. PONDING' EAST OF BUSINESS RTE.- 158 MODIFY EXIST. JUNCTION BOX AT OCEAN OUTFALL TOI IN FRONT OF "THE FIRST FLIGHT INN". RECEIVE A GRADED PAVED SWALE FROM FIRST FLIGHT -INN.(STUB SMALL PIPE OUT OF JUNCTION BOX.) 45. EXIST. OCEAN OUTFALL, (SINGLE LINE CONSIDER UPGRADINO THIS 0 ,C-EAN OUTFALL BY OF 30" CMP) IS NOT ON PILING SUP- EXTENDING IT INTO OCEAN ON PILINGS, ADDING A (Photos 51, PORTS,'@ DOES NOT EXTEND TO O-CEAN FLAPGATE DEVICE, AND VERIFY THAT THIS OURFALL & 52) AS IT SHOULD.' HAS AN EXIST. EASEMENT. IF EASEMENT DOES NOT EXIST@ MAKE ARRANGEMENTS.TO SECURE ONE. (D-10) FIGURE D SUMMARY OF PROBLEM AREAS WITH PROPOSED SOLUTIONS DRAINAGE PROBLEM DESCRIPTION OF PROBLEM AREAS PROPOSED SOLUTIONS TO PROBLEMS BASIN REF. NO. 0-2 46. "OCEAN ACRES" PONDING IN YARDS AS OF APRIL 1983, A DETAILED DRAINAGE PLAN IS (Photos 5,6, AND IN SOME CASES IN HOMES, ALSO BEING DONE WHICH WILL BASICALLY ACCOMPLISH THE 7, & 8) PONDING ON STREETS CAUSING TRAFFIC FOLLOWING THINGS: PROBLEMS AS WELL AS ACCELERATING BEGIN AN 15" STORM SEWER SOUTH OF STREET DETERIORATION. (LOW AREAS OCEAN ACRES DR.5 BETWEEN COPLEY DR. AT ELEVATION 10+, ARE.SURROUNDED B' & JONES CT. . CONTINUE NORTH THROUGH HIGHER GROUND WITH NO OUTLET WHEN SUBDIVISION ALONG PROPERTY LINES SOILS BECOME SATURATED.) (WITH EASEMENTS). ACROSS BURNS DR. & (PRIORITY NO. 1) TIE INTO SYSTEM WHICH TRAVERSES "WHISPERING PINES" SUBDIVISION. THIS MAIN STORM SEWER LINE WILL BECOME THE MAJOR OUTLET FOR STREET & YARD DRAINAGE. RUN-OFF WILL BE DRAINED TO THE "MAIN OUTLET" BY DITCHES ALONGSIDE STREETS WITH CULVERTS PLACED AT DRIVEWAYS & STREET CROSSINGS. A PORTION OF "OCEAN ACRES" WILL BE DRAINED TO THE D.O.T. PROPOSED DRAINAGE SYSTEM ALONG RTE. 158 BYPASS;,SEE #54. FUTURE IN- VESTIGATION WILL CONTINUE ON POSSIBLE POND OVERFLOW DRAINAGE SYSTEM TO HELP REGULATE POND ELEVATION. NO COSTESTI- MATE SINCE DETAIL PLAN IN PROGRESS OUTLINED ABOVE. (D-11) FIGURE D SUMMARY OF PROBLEM AREAS WITH PROPOSED SOLUTIONS DR@IVA_GEPROBLEM DESCRIPTION OF PROBLEM -AREAS -PROPOSED-SOLUTIONS TO PROBLEMS BASIN REF. NO. 0-2 47. "WHISPERING PINES" SUBDIVISION; PIPE SYSTEM THROUGH SUBDIVISION (SOUTH (Photos 11, PONDING ON MOSTLY-UNDEVELOPED LOTS UPSTREAM INLET JOINS "OCEAN ACRES" SYSTEM & 12) - & STREETS. DISCUSSED IN #.46), TO NORTH LIMITS OF @-(NOTE: LOW AREAS AT ELEVATION 10� WHISPERING PINES SUBDIVISION, THEN A NEW FLAT- ARE SURROUNDED BY HIGHER GROUND BOTT014 DITCH ALONG THE WEST R/W OF HELEN ST. WITH NO OUTLET WHEN SOILS BECOME THEN ALONG THE SOUTH R/W OF HOLLY ST. EAST TO SATURATED.) THE EXIST*.CROSS-DRAIN UNDER 158 BYPASS. CROADSIDE SWALES WILL - DRAIN PONDED WATER ALONG S TREET5 TO THE NEW" PIPE SYSTEM.) . 48. EXIST. DITCH FROM TENTH ST..EAST. PROVIDE MAINTENAN.CE ON A REGULARLY SCHEDULED TO SECOND ST.'HAS HEAVY VEGETATION BASIS ON DITCHES TO ELIMINATE THE LARGE BRUSH IN FLOWLINE'CAUSING RESTRICTIONS & SMALL TREES EXISTING IN THE DITCH NOW. IN DRAINAGE & UNECESSARY BUILD-UP OF TRASH & DEBRIS AT INLETS OF. STREET CROSSINGS. 49. APPARENTLY A SEPTIC TANKDRAINS HAVE THE APPROPRIATE HEALTH -OFFICIALS LOOK AT (Photo 14) INTO THE EXIST. DITCH BETWEEN THIS AREA AND MAKE RECCOTIENDATIONS. THIRD ST. & FOURTH ST. 50. EXIST. 43" X-27" CMP UNDER RTE.. TO BE CLEANED OUT AS A PART OF WHISPERING 158 BYPASS SILTED FULL. PINESTROJECT CPROBLEM 47). (D-12) FIGURE D SUMMARY OF PROBLEM AREAS WITH PROPOSED SOLUTIONS RAINAGE PROBLEM DESCRIPTION OF PROBLEM AREAS PROPOSED SOLUTIONS TO PROBLEMS BASIN REF. NO. 0-2 51 WRIGHTSVILLE AVE, & HOLLY ST. HAS INSTALL 4o'-241, CMP UNDER WRIGHTSVILLE AVE. ONLY A PARTIAL CULVERT'UNDER CLAY CLEAN-OUT SILT JUST EAST OF STREET. STREET, CAUSING DRAINAGE TO CROSS TOP OF STREET., ERODING STREET & SILTING DITCH DOWNSTREAM. 52. DOUBLE LINE OF 15" CMP SILTED AND REPLACE WITH A SINGLE LINE OF 24" CMP TO GIVE RESTRICTS FLOW TO OCEAN OUTFALL. A LARGE SINGLE BARREL FOR BETTER FLOW AND ALSO FOR EASIER CLEAN-OUT. 53. PONDING EAST OF RTE. 158 BYPASS IN NO CONVENIENT OUTLET TO DRAIN TO.- CONSIDER VICINITY OF "OUTER BANKS MOTOR USE OF AN INFILTRATION TRENCH AND/OR USING LODGE". A PERMEABLE PAVEMENT SURFACE SUCH AS "TURFSTONE". 0-3 54. EAST PORTION OF'"OCEAN ACRES"= THIS PORTION OF OCEAN ACRES IS DESIGNED TO (Photos 9, PONDING IN YARDS, STREETS CAUSING DRAIN TO A PROPOSED STUB PIPE SOUTH OF OCEAN 10, & 13) ACCELERATED STREET DAMAGE. ACRES DR. ON THE D.O.T. DRAINAGE SYSTEM FOR THE RTE. 158 BYPASS IMPROVEMENTS. THIS WILL BE ACCOMPLISHED BY USING ROADSIDE SWALES & CULVERTS AT STREET APPROACHES & PRIVATE DRIVES. (PROPERTY OWNERS WILL NEED TO DRAIN THEIR YARDS TO THE FRONT.) (D-13) FIGURE D SUMMARY OF PROBLEM AREAS WITH PROPOSED SOLUTIONS DR@IRAGE 7R--OBLEM- DESCRIPTION OF PROBLEM AREAS PR.OPOSED S .OLUTIONS TO PROBLEMS BASIN REF. NO. 0-3 55. PONDING ON OR NEAR THE EXIST. R/W A WIDENING PLAN IS UNDERWAY FOR RTE. 158 (Photo 34)' ALONG-RTE. 158-BYPASS FROM PINE BYPASS FROM PINE,GROVE TRAIL TO NAGS HEAD. GROVE TO LAKE DR.;-(EAST & WEST THE DRAINAGE PLANS FOR THIS PROJECT INCLUDE SIDES). PIPE STUB-OUTS.IN LOW AREAS TO ELIMINATE PONDING WATER. 56. EROSION AT NORTHWEST CRNER OF USE A CONCRETE SWALE TO CHANNEL RUN-OFF (Photo 40) KENTUCKY FRIED CHICKEN; UTILITY AROUND UTILITY POLE TO PREVENT EROSION & POLEIN DRAINAGE PATH. SILT DOWNSTREAM. 57. - SAND FILL WEST OF BUSINESS RTE.. AREA FROM 8TH ST. NORTH TO THE EXIST. OCEAN (Photos 16, 158., ACROSS FROM "TANYA'S OCEAN OUTFALL DEPENDS ON AN OPEN DITCH TO THE & 18) HOUSE", BLOCKED DRAINAGE DITCH OUTFALL. RELOCATE DITCH ALONG FRESH POND DR. TO INLET TO THE EXIST. OCEAN OUT- NORTH SIDE, THEN ALONG WEST SIDE OF BUSINESS FALL. RTE. 158 TO THE EXIST. OR "'NEW" OUTFALL BY D.O.T. (_#-5$)- EXIST. OCEAN OUTFALL UNDERNEATH D.O.T. PLANS TO ADD A NEW OCEAN OUTFALL IN 58. (Photos 19, TANYA'S OCEAN HOUSE" MOTEL THE R/W OF LAKE DRIVE ON EAST SIDE OF BUSINES@' CONTINUALLY B_URIED BY SAND FROM RTE. 158. (.SIZE & MATIL. = 361, SINGLE LINE 29, & 30) N.-E. STORMS, AND ALSO IT IS ON OF RCP ON PILINGS EXTENbED INTO OCEAN.) LAND WITHOUT@AN EASEMENT. (.OUTFALL IS NOT ON PILI.NGS OR EXTENDED INTO OCEAN.) (D-14) APPENDIX E References 1. A Sunmary Report - Southeast Conference on Urban Storm Water Management, at North Carolina State University, April, 1979 Prepared by David H. Howell, Published by Water Resources Research Institiute, The University of North Carolina. 2. Design and Const ruction of Sanitary and Storm Sewers, ASCE Manuals and Reports on Engineering Practice - No. 37,- 1974. 3. Design of Exfiltration Trench Systems for Underground Disposal of S't*orm Water Runoff by Darrell E McQueen, P.E. Briston, Childs and'Associates, Inc., Coral Gables, Fla. May, 1979. 4. Engineering Fi'eld Manual 'for Gons'ervation Practi'c@es, U.S. Department of Agriculture, Soil Conservation Service, April, 1975. 5. Flood Insurance Rate Map ,@Kill Devil Hills, No'r'th Carolina, No. 375353 A - U.S. Department of Housing and Urban Develop. 6. Guidelines for Control of Erosion and Sediment During Cons'truction, North Carolina Department of Transportation, July 1, 1980. 7. Handbook of Design for Highway .Surface Drainage 'Structures, preparedby Bridge Location & Hydrographic Department, C.R. Edgerton, State Hydrographic Engineer, 1973. C@ 8. Hydrology, Section 4, SCS National Engineering Handbook, U.S. Department of Agriculture, Soil Conservation Service, August, 1972. 9. Practices in 'Detention of Urban Stormwater Runoff, American Public Works Association Special Report No. 43, 1974. 10. Proceedings of a Workshop - North*Carol'ina Worksh*op'on Management of Stbrmwat'er, SediMeTita't'ibn, 'and Fl*ood Control in UrbariAre'as, January 5, 1978, published.by Water Resources E-1 Research Institute of The University of North Carolina. 11. Roadway 'Standard Drawings, State of North Carolina, Depart- ment of Transportation, Division of Highways Roadways Design Unit, July 1, 1978. 12. Sedimentation Control, Chapter 4, Title 15, North Carolina Administrative Code,- January ll,,1978. 13. Standards and Sp'ec'i'ficatiori 'for' 'Roads and Structures, North Carolina Department of Transportation July 1, 1978. 14. Stormwater Management Alternatives, J. Tourbier and R. Mestmacott, Editors, Water Resources Center., Univeristy of Delware, April, 1980. 15. Subdivision Roads. - Minimum Construction Standards, North 16. Carolina Department of Transportation July 1, 1979. Town of Nags Head Surface Water Drainage Plan, Coastal Consultants, LTD and McDowell-Jones, P.A., June 30, 1980. 17.- Underground Disposal of Storm Water Runoff, Design Guidelines Manual,by Joseph B. Hannon,.P.E., U.S.'Department of Transporta- tion, Federal Highway Administration (FHWA TS-80-218) February, 1980. 18. Urban Hvdrology for Small Wate@r'sheds, Technical Release No. 55, United States Department,of.Agric.ulture, Soil Conservation Service, January, 1975.' @19. Various 'S'oil' 'S*urveys, Dare County, North, Carolina, United States Department of Agriculture, Soil Conservation Service, Various D'ates. 20. Water' 'and Urban 'S'tdr!@wdter, A Management Plan, Divi$ion of Environmental Management, North Carolina Department of Natural Resources and Community Development, July, 1979. E-2 3 6668 14101 7295