<?xml version="1.0" encoding="iso-8859-1" ?>
<doc callnum="TC424 .A44 U77 1978">
<metadata>
	<titleStmt>
		<mainTitle nfc="0"><title>Assessment of water systems-American Samoa</title>,<respStmt>prepared for U.S. Army Engineer District, Honolulu ; prepared by the URS Company Hawaii.</respStmt></mainTitle>
	</titleStmt>
	<authorStmt>
		<corpAuthor><name>URS Company (Hawaii)</name></corpAuthor>
		<corpAuthor><name>U.S. Army Engineers District, Honolulu.</name></corpAuthor>
	</authorStmt>
	<imprint><pubPlace>Honolulu</pubPlace>,<pubName>URS Company Hawaii</pubName>,<pubDate>1978.</pubDate></imprint>
	<classStmt>
		<locClass>
			<subject cat="top">Water resources development</subject>
			<subject cat="geo">American Samoa.</subject>
		</locClass>
	</classStmt>
</metadata>

<text xml:space="preserve">
<pb n="1" />

         AMERICAN SAMOA WATER RESOURCES STUDY

                                                     COASTAL ZONE

                                                  INFORMATION CENTER

                                    ASSESSMENT              OF
          7o.
                                   WATER SYSTEMS
         71i' "t                   AMERICAN SAMOA

                                       g@Rmlw

                                                               'eb .
                                 IL

            U. S   ARMY ENGINEER        DISTRICT,    HONOLULU
<pb n="2" />

                              AMERICAN SAMOA WATER RESOURCES STUDY

                                    ASSESSMENT OF WATER SYSTEMS

                                          AMERICAN SAMOA

                                            Prepared for:

                                 U. S. Army Engineer District, Honolulu

        4                                 September, 1978

                                   US Department of Commerce
                               NOAA Coastal Servzces Center Libr=T
                                    2234 South        Avenue
                                     Charlestong SC 2'04-14'5-2413

                                            Prepared by:
                                      U R S COMPANY HAWAII
                                     Suite 909, 1164 Bishop Street
                                       Honolulu, Hawaii 96813
<pb n="3" />

                                                                                                              URS                    SIONAL SERVICES ORGANIZATION
                                                                                                              AN INTERNATIONAL PROFES

                                                                      URS COMPANY HAWAI                    I  NEW YORK
                                                                                                              SAN FRANCISCO
                                                                         SUITE 909,1164 BISHOP STREET         WASHINGTON. D.C
                                                                                HONOLULU, HAWAII 96813        DALLAS
                                                                                                              SEATTLE
                                                                                       TEL: (808) 533-3861    DENVER
                                                                                                              KANSAS CITY
                                                                                                              HONOLULU
                                                                                                              NEW ORLEANS
                                                                                                              SAN MATEO
                                                                                                              HONG KONG
                                                                                                              BOLIVIA

                    September 19, 1978

                    Mr. Kisuk Cheung
                    Chief, Engineering Division
                    Department of the Army
                    U.S. Army Engineering Division
                    Building 230, Fort Shafter
                    Honolulu, Hawaii 96111

                    Dear Mr. Cheung:

                    Subject: Assessment of Water Systems
                                    American Samoa
                                    Contract DACW84-78-C-0008
                                    URS 8504

                    We are pleased to submit this final report entitled "Assessment of
                    Water Systems, American Samoa".

                    As directed by the scope of work this assessment contains documentation
                    of all ongoing and proposed water system improvements; engineering
                    evaluation and problem identification; and engineering and management
                    recommendations for the problems identified.

                    The data resulting from this assessment and the recommendations made
                    are intended to provide a source of information for all interested
                    agencies.

                    We appreciated having had the opportunity to work on this challenging
                    assignment.

                    Sincerely,

                    URS COMPANY HAWAII

                    Edward C. Stevenson, P.E.
                    Vice President
<pb n="4" />

                                           ASSESSMENT OF WATER SYSTEMS

                                                  AMERICAN SAMOA

                                                 TABLE OF CONTENTS

                   Chapter                Subject                                   Page No.

                                  Introduction

                                     Study Objectives                               1-3
                                     Scope                                          1-3
                                     Methodology                                    1-4
                                     Acknowledgements                               1-5
                                     Physical Characteristics of
                                        the Study Area                              1-5

                                     Socio-economic Characteristics
                                        of the Study Area
                       Ii         Summary
                      III         The Existing System, Ongoing and Proposed
                                  Improvement Programs

                                     Historical Overview of System

                                     Existing American Samoa Government
                                        Water System                                111-7
                                     Existing Village Systems                       111-12
                                     Existing Design Criteria                       111-15
                                     Ongoing and Proposed A.S.G. Water
                                        System Improvements                         111-18

                       IV         Recommended Design Criteria

                                     Population Projections                         IV-1
                                     System Demand Design Criteria                  IV-8

                        V         Identification of Problems

                                     Surface Water Supplies                         V-1
                                     Ground Water Supplies                          v-4

                                     Treatment                                      v-6
                                     Transmission and Pumping                       V-8
<pb n="5" />

                                    TABLE OF CONTENTS (cont'd)

                 Chapter                 Subject                                     Page No.
                    V           Identification of Problems (cont'd)
                                   Distribution Storage                              V-14
                                   Distribution System                               V-16
                                   Right-of-Way                                      V-19
                                   Village Systems                                   V-25
                                   Water Systems Management                          V-33

                   VI           Conclusions and Recommendations

                                   Water Sources                                     VI-1

                                   Transmission and Pumping System                   VI-10
                                   Storage                                           VI-17

                                   Treatment                                         VI-21

                                   Distribution System                               VI-22
                                   Rehabilitation Program                            VI-23
                                   Village Water Systems                             VI-26
                                   Right-of-Way Acquisition                          VI-43
                                   Water Systems Management                          VI-48

                                List of References                                   R-1

                                Appendix
                                   A - GAS System Water Usage Reports                A-1

                                   B - Ground Water Development in American
                                       Samoa                                         B-1

                                   C - Review of Existing Literature                 C-1
<pb n="6" />

                                             ASSESSMENT OF WATER SYSTEMS

                                                    AMERICAN SAMOA

                                                    LIST OF TABLES

                      Table
                      Number                  Description                                   Page No.
                      III-1           Inventory of American Samoa Government
                                      Facilities in Villages                                111-8
                      111-2           Existing American Samoa Government
                                      Surface Water Sources                                 III-10
                      111-3           Comparison of Past Design Criteria                    111-16
                      111-4           Existing Water System Design Criteria                 111-17
                      111-5           Proposed A.S.G. Capital Improvement
                                      Program                                               111-19
                       IV-1           Population of American Samoa from
                                      1900 to 1974 by District                              IV-2

                       IV-2           American Samoa General Plan
                                      Population Projections                                IV-4
                       IV-3           Study Area Population by Village                      IV-7
                       IV-4           Evaluation of Water Consumption                       IV-9

                       IV-5           Recommended Service Levels                            IV-13
                       IV-6           Year 2000 Peak Day Flow Rates                         IV-14

                       IV-7           Minimum Recommended Fire Flow
                                      Requirements                                          IV-16
                       IV-8           Reservoir Sizing                                      IV-18
                        V-1           Peak 1978 Flow Rates for A.S.G.
                                      Water System                                          V-9
                        V-2           Hydraulic Grade Line for A.S.G. Water
                                      System - 1978 Peak Day Flow                           V-10
                        V-3           Peak 1983 Flow Rates for A.S.G.
                                      Water System                                          V-11
                        v-4           Hydraulic Grade Line for A.S.G. Water
                                      System - 1983 Peak Day Flow                           V-12
                        V-5           Some Water Related Diseases Reported to
                                      LBJ Medical Center                                    V-27

                                                         iii
<pb n="7" />

                                               LIST OF TABLES (cont'd)

                      Number                  Description                                  Page No.
                       VI-1           Suggested Village Ranking for Exploratory
                                      Wells Southeast Shore of Tutuila                     VI-4

                       VI-2           Peak Year 2000 Flow Rates for A.S.G.
                                      Water System                                         VI-11
                       VI-3           Hydraulic Grade Line for A.S.G. Water
                                      System - Year 2000 Peak Day Flow                     VI-12
                       VI-4           Recommended Additional Storage Capacity              VI-18

                                                         iv
<pb n="8" />

                                            ASSESSMENT OF WATER SYSTEMS

                                                    AMERICAN SAMOA
                      Figure                      LIST OF FIGURES
                      Number                  Description                                  Page No.
                        I-1          Study Area Location   Map                             1-2
                      III-1          Existing American Samoa    Government
                                     and Leone Water System                                111-29
                      111-2          Schematic Profile - Existing American
                                     Samoa Government and Leone Water System               111-30
                      111-3          A.S.G. Proposed Improvements -
                                     Western District                                      111-31
                      111-4          A.S.G. Proposed Improvements -
                                     Bay Area and Tafuna-Leone Plain                       111-32
                      111-5          A.S.G. Proposed Improvements -
                                     Eastern District                                      111-33
                        V-1          Public Notice of Poor Water Quality                   V-28
                        V-2          Organization Chart, Department of
                                     Public Works                                          V-34
                        V-3          Organization   Chart, Water Systems
                                     Management                                            V-36
                        v-4          Water System   Operational
                                     Responsibilities                                      V-37
                        V-5          Water Utility Objectives FY'78,
                                     Department of Public Works                            v-43
                       VI-1          Distribution System Rehabilitation
                                     Program Outline                                       VI-24
                       VI-2          Village Water System Decision Diagram                 VI-27
                       VI-3          Schematic Rainshed Water System -
                                     Fitiuta Village                                       VI-34
                       VI-4          Preliminary Design Fitiuta Village
                                     Water System                                          VI-35
                       VI-5          Rainfall Probability at Tafuna Airport
                                     Weather Station                                       VI-36

                                                         v
<pb n="9" />

                                            LIST OF FIGURES (cont'd)

                       Figure
                       Number                 Description                                Page No.
                       VI-6          Schematic Rainshed Water System -
                                     Aoloaufou Village                                   VI-37
                       VI-7          Preliminary Design Aoloaufou Village
                                     Water System                                        VI-38
                       VI-8          Rainfall Probability at Upper Fagaalu
                                     Reservoir                                           VI-39
                       VI-9          Roof Catchment System                               VI-42
                       VI-10         Organization Chart Proposed Water
                                     Division                                            VI-50

                       VI-11         Recommended Water System Improvements -
                                     Western District                                    VI-53

                       VI-12         Recommended Water System Improvements -
                                     Bay Area and Tafuna Leone Plain                     VI-54
                       VI-13         Recommended Water System Improvements -
                                     Eastern District                                    VI-55

                       VI-14         Schematic Profile Recommended Water
                                     System Improvements                                 VI-56

                                                       vi
<pb n="10" />

 a

                                    CHAPTER I
                               INTRODUCTION
<pb n="11" />

                                                  CHAPTER I

                                                INTRODUCTION

                   The water supply situation in American Samoa (Figure I-1) has been a
                   constant source of problems and serious public and private concern
                   from as early as 1960, when economic growth and expanding population
                   began to put a strain on the capacity of the system. Since 1970,
                   tens of millions of dollars have been spent on capital improvements
                   to water systems with little or no apparent improvement to the
                   quality of water service. The severity of this situation was partic-
                   ularly evident during the drought conditions of 1974, when strict
                   water rationing forced restrictions on industrial consumption and
                   resulted in serious economic impacts on the islands.

                   The water shortages seem unwarranted to residents and outsiders alike
                   when considering that the islands receive up to 200 inches of annual
                   rainfall and have a total population of only 30,000 people.

                   The general lack of communication and proper documentation has
                   further complicated the situation with a great deal of public
                   misunderstanding and misinformation regarding the objectives,
                   priorities and progress of water system improvement programs.

                   While low rainfall have had a significant impact, an equally
                   important factor has been the expanding population, economic growth
                   and growing expectations for the quality of water service. A
                   great deal has been accomplished in the past ten years in the areas
                   of basal water production and delivery systems, and demands upon
                   these systems have grown at an astounding rate.

                   As part of its American Samoa Water Resources Study, the U.S. Army
                   Engineer District, Honolulu, in cooperation with the American Samoa
<pb n="12" />

                                                                                                                                                                                                                  424

                                                                                                                                                                                                                  CL
                                                                                                                                                                                                     J
                                                                                        --Mggiii-mc- z
                                                                                                                                                                                                     0
                                                                                                                                                                                                     z
                                                                                                                                                                                                     0
                               &lt;                                                                                                                                            w                        x
                               z                                                                                                                                                                                  w
                               &lt;                                                                                                                                                         z
                               Q                                                                                                                                                         0

                                                                                                                                                                                                                  U-
                                                                                                                                         L.Li                        W      W                        (1)
                                                    0                                                                                                                                    L)          -
                                                    C.)                                                                                                                                  0
                                                    (1)              NN                                                                                              W      W
                                                                                                                                                                     w
                                                                                                                                                                     a.
                                                    z                                                                                                                                    &lt;           w
                                                    &lt;                                                                                                           @-;g        cr           w           w
                                                    cr                                                                                                                      LLI          ly-         z
                                                    U.                                                                                   D                                                           Z5 0
                                                                                                                                         F-                                                          z
                                                    z                                                                                                                                                w
                                                    &lt;
                                                                                        0     L4)                                                                           0
                                                                                        :r
                                                                                                                                                               (40
                                                                                                                                                               n/                                    cr
                                                                                                                                                              cv            z                        &lt;
                                                                                                                                                                            w                        ui
                                                                                                                                                                                                     6

                                                                                                                                                                  U)

                                                                                                                                                               cp

                                                                                                                                                                         5

                                                                                                                                                                     LL.

                                   40                                                                                                                                                    U)
                                                                                                                                                                                         z
                                                                                                                                                                         w        0
                                                                                                                                                                         CC    z  7
                                                      z                                                                                                                           &lt;
                                                     &lt; 0                                    z                                                                                     V)
                                                     CL    &gt;-                               4
                                                            Y.                              9L
                                                           0                                                                                                                   W         z
                                                                                            U)
                                                                                                    fm                                                                   cn
                                                                                                       C-9
                                                                                w                                                                        Zo
                                                                                z                                                                             9:
                                                                      z         a:
                                                                                CL
                                                                                :73 =4                                                                         CL
                                                                                -it z
                                                                                a.
                                                                                                                                                                                  D
                                                                                                                                                         00

                                                                                                                                                                         R-U)
                                                                                                                                                                         &gt;W

                                                                                                                                                                         V)
<pb n="13" />

                   Government (A.S.G.) has conducted this technical assessment of the
                   water supply situation in the Territory of American Samoa.

                   The basic purpose of the Assessment of Water Systems, American
                   Samoa, which was contracted to U R S Company Hawaii (Contract No.
                   DACW84-78-C-0008), is to assist the Goverment of American Samoa
                   in its water system improvement programs by documenting and
                   evaluating these programs. This report will also serve as a
                   source of information for all interested congressional, federal
                   and local agencies. In effect, it will establish a "baseline"
                   for the water supply situation in American Samoa.

                   STUDY OBJECTIVES

                   The specific objectives of this assessment are the following

                        1.    To document all ongoing and proposed water system  s

                              improvement programs.
                        2.    To perform a detailed engineering evaluation of these
                              programs and to identify specific problems.
                        3.    To develop engineering and management recommendations in
                              solution to the problems identified.
                        4.    To prepare a report that will document and summarize the
                              findings, conclusions and recommendations of this

                              assessment.

                   SCOPE

                   The general scope of this assessment will consist of the following:

                        1.    Basically, there are two types of water systems in use in
                              the Territory of American Samoa: (a) the A.S.G. centralized
                              system which serves a portion of the island of Tutuila and

                                                       1-3
<pb n="14" />

                  6) village water systems which serve the remainder of the
                  territory. The scope of this study will include both types of
                  water systems.
             2.   In evaluating improvement programs to determine their
                  adequacy in meeting current and projected (year 2000) needs,
                  this assessment will be based upon existing information
                  and data.
            3.    The scope of this assessment will include the topics of
                  source, transmission and arterial distribution, operation
                  and maintenance, and management.

       METHODOLOGY

       The depth and detail of this study were restricted by the limited
       quantity and quality of basic water system operational data available.
       The A.S.G. Public Works Department, which is responsible for most data
       collection related to the water system, maintains meager records of
       the physical plant and its operating characteristics. The villages do
       not maintain any records pertaining to their water systems.

       Most of the written data available on the water system is contained
       in reports and studies performed by various engineering consulting
       firms.

       Additional field information was collected in Samoa during a two
       week field study in April of 1978. Existing reports, drawings, and
       correspondence were collected from the A.S.G. files; and interviews
       were held with A.S.G. officials responsible for the management
       design and operation of the water system. The existing water system
       shown in this report is as it existed on April 1, 1978.             7                    1
       It should be noted that the Department of Public Works was making substantial
       improvements to the system physical plant and the system management
       structure at the time of our field studies.

                                         1-4
<pb n="15" />

                   The recommendations pertaining to ground water development are based
                   upon "Ground Water Development in American Samoa" prepared by the
                   U.S. Army Engineer District, Honolulu (copy attached as Appendix B).

                   ACKNOWLEDGEMENTS

                   We wish to express our appreciation to the Governor's office, the
                   Development Planning Office and the Department of Public Works for
                   their assistance in preparation of this report.

                   During our field studies, it was our privilege to be in frequent
                   contact with Mr. Edvin Remund, Director of Public Works, and Mr.
                   Al Sundquist, Mr. Marty Heede, and Mr. Geoff Keeler of the Department
                   of Public Works, Water Systems Division, who provided invaluable
                   information and drawings on the existing water system and plans for
                   future improvements. Our appreciation also goes out to Mr. Randy
                   Morris, Mr. Abe Malae and Mr. Seti Maleah of the Water Sewer and
                   Solid Waste Division for their cooperation and time in giving us
                   insight into the operation of the water system.

                   We also received meaningful assistance from Mr. Joseph Pereira,
                   Mr. James Pedersen and Mr. Alfonso (Pete) Galeali of the Development
                   Planning Office who provided us with,direction for our studies and
                   with data on the growth patterns of the study area.

                   PHYSICAL CHARACTERISTICS OF THE STUDY AREA

                   Identification and Location

                   The study area includes the entire Territory of American Samoa
                   except for Rose and Swains Island. American Samoa is the southern-
                   most possession of the United States and consists of a group of
<pb n="16" />

         @even islands located in the South Pacific at about 170 0 West
         longitude and 140 south latitude. These islands contain approxi-
         mately 76.1 square miles and are about 2,300 nautical miles south-
         west of Hawaii, 1,200 nautical miles northwest of Tahiti, 1,600
         miles northeast of New Zealand, and about 80 miles southeast of the
         independent state of Western Samoa, see Figure I-1. The islands of
         Samoa are located along the crest of a submarine volcanic ridge
         which extends for over 300 miles and trends generally 75 0 southeast.

         The five volcanic islands of Tutuila, Aunulu, Ofu, Olosega, and
         Talu are the major inhabited islands. Tutuila, the largest and
         principal island, is the center of government and business. Aunulu,
         a satellite of Tutuila, lies one mile off the east coast of Tutuila.
         The three islands of Ofu, Olosega, and Talu are collectively called
         the Manula Islands, and lie some 65 miles to the east of Tutuila.
         The two remaining islands of American Samoa are Rose and Swains,
         both of which are coral atolls. Rose Island, about 160 miles to
         the east of Tutuila is the territory's only uninhabited island.
         It does not have enough water to support human life and is
         preserved as a wildlife refuge for sea turtles and birds.

         Swains Island, about 230 miles north of Tutuila, is the northern-
         most island of the territory and is geographically a part of the
         Tokelau Islands, but administratively is part of American Samoa.
         The island is privately owned by the descendants of a New England
         whaling captain.

         The islands of American Samoa were discovered in the 1700's by
         Dutch navigators. Although the islands remained unclaimed for
         many years they were the subject of great power struggles between
         the United States, Germany, and Great Britain. The Convention of
         1899 resulted in the forfeiture of Germany and Great Britain of

                                            1-6
<pb n="17" />

                   all claims east of the 171st meridian, and the United States
                   dropped all claims to the islands of Upolu and Savaili which now
                   comprise Western Samoa. In 1900 the chiefs of Tutuila and Aunu'u
                   ceded title to the United States. Four years later the chiefs of
                   the Manula Islands followed suit. From 1900 to 1951 the U.S. Navy
                   administered the islands as a territory of the United States. In
                   1951, administration was transferred to the U.S  Department of
                   Interior. American Samoa remains an unorganized, unincorporated
                   territory of the United States. Its inhabitants are American
                   nationals (but not citizens) who may visit or emigrate to the
                   United States without passports. No organic legislation has been
                   enacted for.the territory by the U.S. Congress. Since 1951, the
                   governor of the territory has been appointed by the Secretary of
                   the Interior. In November of 1977, however, following a recent
                   plebiscite in which the citizens of American Samoa expressed a
                   desire for more local control of their government, local elections
                   were held for the positions of governor and lieutenant governor.

                   Topography

                   The islands of American Samoa are of volcanic origin and exhibit
                   the rugged topographic relief common to Pacific volcanic islands.
                   The islands rise precipitously from the ocean and their rugged
                   flanks are clothed in lush tropical vegetation. Typically,
                   sheltered embayments develop small coastal plains providing one
                   of the few sources of flat land in the territory. Palm lined sand
                   and coral rubble beaches rim much of the islands except where
                   exposed to severe marine erosion. Beyond the narrow beach there
                   is usually a moderately wide fringing reef providing limited
                   protection to the shore. The maximum elevations for the five
                   major volcanic islands are 2142, 280, 1621, 2095, and 3180 feet

                                                      1-7
<pb n="18" />

          for Tutuila, Aunulu, Ofu, Olosega, and Talu respectively. Drainage
          is provided by deeply incised stream valleys radiating from the
          summit of each distinct volcanic cone.

          Tutuila is geologically the most complex of the islands. Its
          spine consists of overlapping centers of volcanic activity. The
          north shore is deeply indented by embayments with little flat land
          other than at the mouth of each of the streams. The coastline is
          typified by high cliffs plunging directly into the ocean. The
          southern coastline is slightly more protected. The Tafuna-Leone
          Plain extends along the south side of the island from Nuuuli west-
          ward to Leone. This formation is believed to be a late stage lava
          flow overlying a former barrier reef. During a lower sea stand,
          what is now Pago Pago Harbor was carved as a major stream valley.
          A rise in sea level flooded the former valley and produced one of
          the deepest and most sheltered harbors in the Pacific. The
          majority of the southern coast consists of broad fringing reefs
          except immediately near stream mouths where the salinity is too
          low for coral growth.

          Tutuila Island is about 18 miles long and varies in width from I
          to 6 miles. The total land area is about 53 square miles. Land
          with slopes less than thirty degrees is scarce and found mostly in
          the Tafuna-Leone Plain. The Tafuna-Leone Plain has an area of

          about 13.5 square miles. The total land area with slopes less
          than thirty degrees is approximately 16.5 square miles or about 30
          percent of the island.

          Aunulu, off the east coast of Tutuila, is a small volcanic tuff
          cone that is dominated by a slightly dissected crater whose rim

          rises 200 to 300 feet above sea level. Its land area is about 0.6

                                            1-8
<pb n="19" />

                    square mile. The floor of the crater is occupied by a marsh and
                    lake. Marine erosion has developed steep cliffs on the east and
                    south sides of the cone. Habitation on the island is on a low

                    coastal flatland that rims the west and north sides of the island.

                    Ofu and Olosega are remnants of a single volcanic island and are
                    separated by a 500 foot wide straight. Both islands rise abruptly
                    from the ocean with little flat land other than a narrow band along

                    the coast. A small island off the western side of Ofu has been
                    spectacularly carved into grottos, caves, and arches by marine
                    erosion. The land areas of Ofu and Olosega are approximately 3
                    and 2 square miles respectively.

                    Talu is the largest of the Manula Islands, covering 17 square miles.
                    It is formed from the northern hemisphere of the shield volcano,
                    Mt. Lata. Streams are scarce and have poorly developed and shallow
                    valleys. The south side of the island is inaccessible and consists
                    of spectacular cliffs and cascades that drop over 1000 feet into the
                    sea. Most of the coastline along the northern and western sides of
                    the island are fringed by a fairly wide coastal plain fronted by
                    narrow beaches. The villages on the west end of the island are
                    built on terraces which are 10 to 15 feet above sea level and are
                    composed of sand dunes and storm benches of coral sediments deposited
                    by high waves.

                    Climate

                    The climate of American Samoa is tropical and characterized by
                    wet and dry seasons rather than the continental four seasons of
                    winter., spring, summer, and fall. During the wet or summer period
                    of November through April, the islands lie in the intertropical
                    convergence zone. This results in weak and variable winds, high

                                                       1-9
<pb n="20" />

         temperature, rainfall, and humidity. In the dry season or winter
         from May through October, the islands are influenced by the southern
         hemisphere trade winds. The prevailing southeasterly winds bring
         slightly lower temperatures and less rain.

         Precipitation results from the upward deflection of the trades as
         they pass over the island as well as from major storm fronts and
         isolated thunderstorms. The annual precipitation varies with both
         location and elevation. The Pago Pago airport on the Tafune-Leone
         Plain receives an average of 125 inches per year, whereas the Pago
         Pago Harbor area only four and one-half miles away receives an
         average of nearly 200 inches per year. The summit of Mt. Alava
         which overlooks Pago Pago Harbor at an altitude of 1600 feet re-
         ceives more than 250 inches per year. It would appear that American
         Samoa is blessed with an over abundance of rainfall. However,
         seasonal rainfall variations are considerable and it is not uncommon
         for extended dry periods of two to three months duration to result
         in critical water supply shortages. In general,  the driest months
         are June through September and the wettest months are December
         through March.

         The average temperature is about 800F. The mean daily range is
         about 120F and the mean seasonal variation is only 30F. January,
         February, and March are the warmest months, and June, July, and
         August are the coolest. The highest recorded temperature at the
         airport was in the low 90's and the lowest was near 600F.

         Flora and Fauna

         The vegetation of American Samoa originally consisted of dense
         tropical forests. Man has influenced this by forest clearing for
         'both cultivation and habitation. Approximately 70 percent of

                                           I-10
<pb n="21" />

                   Tutuila and 95 percent of Talu remain in original tropical forest
                  .vegetation. Cultivated lands consist principally of banana, taro,
                   and coconut plantations. Breadfruit trees are also extensively

                   grown.

                   American Samoa has few endemic animals. Domestic animals such as
                   fowl, pigs, and dogs were brought in with the early polynesian
                   settlers. There are no snakes but other small reptiles are
                   plentiful. The most abundant forms of wildlife are birds. The
                   number of species is limited to about thirty indigenous species
                   and a dozen or so seasonal inhabitants.

                   There have been few studies of the freshwater biological communities
                   since most of these streams are of intermittent flow. The reef
                   communities fringing the islands are characterized by numerous
                   species of fish such as surgeon fish, goat fish, parrot fish, wrasse,
                   mullet, and damsel fish. The open ocean surrounding the territory
                   contains skipjack and yellowfin tuna, marlin, sailfish, and dolphin.

                   SOCIO-ECONOMIC CHARACTERISTICS OF THE STUDY AREA

                   Culture

                   The people of American Samoa are culturally tied to the Western
                   Samoans. The Samoan people are   polynesians as are the Hawaiians,
                   Tahitians, Tongans, and the Maoris of New Zealand. Their traditional
                   lifestyle revolves around the extended family (11aigall). The aiga
                   is a communal lifestyle headed by a chief (I'mataill). The matai is
                   responsible for the welfare of all under his rule. Additionally,
                   he is responsible for protection and distribution of the,family's
                   land.

                   The traditional Samoan lifestyle (11fala Samoa") is often at odds
                   with traditional western lifestyles. Fala Samoa places great
<pb n="22" />

         importance on the dignity and achievements of the group rather
         than on individual achievements.

         Historically, each village which was composed of one or more aigas,
         was self supporting, and trade with other villages or outsiders was
         not a basic necessity of life. Increased contacts with western
         outsiders have caused the development of a job oriented cash economy.
         This cash economy is in conflict with fala Samoa and, increasingly,
         Samoans are faced with the conflicts between the desire for
         western material goods and a strong cultural link with fala Samoa.
         Traditional Samoan values and authority are being diffused by
         increased formation of nuclear families and values emphasizing
         individual achievement and opportunity. The result is that American
         Samoa is becoming increasingly westernized and fala Samoa is becoming
         more and more difficult to maintain. There is a bright spot in that
         the youths of American Samoa are becoming increasingly conscious
         and proud of their heritage. This program is being actively
         pursued through the educational system.

         Economy

         American Samoa's economy is dependent on a very limited base.
         Employment trends in American Samoa reflect the shift from a
         subsistence type of economy to a cash economy. Many Samoans prefer
         the cash-paying jobs available in the Pago Pago Harbor area, and
         particularly with the Goverment of American Samoa, the largest
         single employer in the territory. In 1970 the A.S.G. employed 2,790
         persons or 54 percent of the total work force of 5,094. Since
         1970 A.S.G. employment continued to increase while employment
         in private sector is believed to have increased only slightly.

         Other leading employers are the food processing industries, including
         can manufacturing, the shipping and transportation industry which

                                          1-12
<pb n="23" />

                    includes seafaring and dockside personnel, and tourism. The Starkist
                    and Van Camp tuna canneries employed over 1,100 Samoans in 1970.
                    Additionally, there were over 2,900 oriental fishermen employed by
                    the fishing boats based out of Pago Pago. These fishermen undoubt-
                    edly spent a portion of their income while in port thus stimulating
                    the entire economy. Unfortunately, the total number of fishing
                    boats based out of Pago Pago has been declining.

                    Although much of the current work force is engaged in unskilled
                    labor., an increasing number of Samoans are seeking higher education
                    in professional fields and are gradually expected to assume jobs
                    now held by non-Samoans ("palagill). This is in consonance with the
                    U.S. Department of Interior's goal to promote economic, social, and
                    political development leading to a full measure of self-government
                    and the active participation of the residents of American Samoa in
                    the life of their country.

                    A drastic reduction of corporate income tax in FY 1975 was caused
                    by a severe water shortage that resulted in a shutdown of the
                    canneries. The lost tax income rippled throughout the territory
                    as the A.S.G. was required-to implement a reduction in force by 10
                    percent. Similar incidents of boom/bust economy are possible until
                    a more diversified tax base can be established. The variability of
                    Federal grants and loans also affects the level of A.S.G. employment.

                                                       1-13
<pb n="24" />

                                  CHAPTERII
                                  SUMMARY
<pb n="25" />

                                                 CHAPTER II

                                                   SUMMARY

                   GENERAL

                   The American Samoa Government Central Water System

                   Over the past eight years, considerable effort has been expended
                   toward improvement of the American Samoa water supply situation.
                   Upon performing this engineering review, it was evident that sub-
                   stantial improvements to the physical plant of the American Samoa
                   Government (A.S.G.) water system have been achieved. The rapid
                   improvement of the system has been accompanied by extensive expan-
                   sion into new service areas in response to critical water shortages.
                   While the extensions were made with the best of intentions, in some
                   cases insufficient analysis was made of the ability of the existing
                   system to adequately operate and supply these new areas. The water
                   system was improved and extended faster than the ability to reliably
                   manage and operate the new system. Consequently, complaints about
                   the quality of water service continue in spite of the fact that the
                   system is producing and distributing over five times as much water as
                   it was during the dry season of 1972.

                   The management and operational problems have created a general
                   public misunderstanding of the A.S.G. motives in development of the
                   water system. Residents of areas with water shortages feel that water
                   is being taken from their area to serve the industrial, commercial
                   and governmental centers. There is an urgent need to develop a
                   public information and education program to counteract the many
                   public misconceptions.

                   For the existing service areas, improvements to the water production
                   and transmission components of the central system have essentially
<pb n="26" />

         been completed. The emphasis is now being directed toward upgrading
         the distribution system and more efficient system management and
         operation.

         The Village Water Systems

         Efforts to improve village water systems have also increased over
         the past eight years in response to a growing population and to greater
         per capita demands for water caused by rising standards of living.
         The improvements to village water systems have largely been made on
         an unplanned basis in the form of remedial improvements to the grossly
         inadequate existing water systems. Traditionally, the villages want
         to remain independent of outside influences and retain operational
         control over the water systems, but they lack the financial resources
         and technical abilities.

         The A.S.G. is placed in a difficult position in the villages of
         trying to improve the standard of living and to maintain water
         service to the many government operated facilities (schools,
         offices, housing, etc.) without having operational control over
         the water system.

         Past attempts to improve village water systems have been largely
         unsuccessful because the villages have not contributed to or
         participated in the planning and construction processes.

         In cooperation with the Samoan community, the A.S.G. needs to establish
         a firm policy to clarify its role and functions when dealing with village

         water systems.

         MANAGEMENT

         A reorganization of the Department of Public Works functions dealing
         with water systems design, construction, maintenance, and operation to

                                          11-2
<pb n="27" />

                    take advantage of existing professional talent and to improve coordi-
                    nation is needed. As a recommendation, a Water Division could be
                    formed within the Department of Public Works, to combine planning,
                    design, construction, operation, and maintenance of all water systems
                    under one Assistant Director of Public Works. This organization would
                    provide increased engineering expertise for operational decisions
                    without duplicating engineering or support staff efforts in separate
                    design and operation divisions. The existing in-service training
                    program should be expanded to include all levels of management, as
                    well as field personnel and the topics expanded to include billing and
                    other management considerations.

                    Additional repair crews and equipment, meter installation and meter
                    reading crews, mid-level managers, and engineering expertise will be
                    required if the benefits of the new transmission and sources develop-
                    ment programs are to be extended to the people and if the goverment
                    is to operate and maintain planned improvements in the best long-term
                    interest of the territory.

                    A future alternative for consideration is the formation of a separate
                    authority such as a Board of Water Supply. The formation of a separate
                    Water Division could serve as a first step. The Board would presumably
                    have all of the functions of the previously mentioned Water Division
                    and would operate more independently of the A.S.G. This would require
                    development of separate billing, procurement, and other administrative
                    functions creating additional overhead expense and a demand for trained
                    manpower that is critically short in Samoa. The Water Board concept
                    does not now appear warranted for the marginal benefits of bypassing
                    political pressure and cumbersome governmental regulations regarding
                    personnel and procurement procedures.

                    Long-term planning and policy direction from the highest level of
                    territorial goverment also needs to be developed. Such items as the

                                                      11-3
<pb n="28" />

         philosophy of continual subsidy of the water system or the possibility
         of system revenue meeting all (or a fixed percentage) of operating
         costs need to be addressed in the form of governmental policy. The
         goals of expansion of the system and of increased potable water quality
         also require attention.

         An ongoing public awareness program should be incorporated into the
         Water Division activities. The program should include both formal
         public hearings and informal workshops, as well as regular television
         news coverage of system changes. Dissemination of information on how
         the system operates and the problems encountered by the Water Division
         would be of value. Announcing failures and successes in solving
         difficult problems will also do much to narrow the gap between public
         expectations and Water Division capabilities. This mutual understanding
         will do much to improve water system management, from which the people
         of the territory will ultimately benefit.

         RIGHT-OF-WAY ACQUISITION

         Right-of-way acquisition for water system improvements has been a
         serious problem for the Department of Public Works for many years.
         Badly needed projects have been delayed or halted indefinitely by
         extended right-of-way negotiations or right-of-way disputes. Projects
         have been modified at the increased cost or at the expense of the
         system's operating efficiency in attempts to skirt right-of-way
         problems.

         The problems are related to the communal land ownership system under
         which the majority of the land in American Samoa is held. Most of the
         communal land has not been surveyed and registered with the court, and
         ownership and boundary disputes over this land often exist. There is
         no formal procedure to obtain a verification of land ownership when
         the land has not been recorded. Persons stating a claim on land, can

                                           11-4
<pb n="29" />

                    file and often can obtain temporary restraining orders against A.S.G.
                    land acquisition attempts without posting a bond.

                    The problems have also resulted from the use of relatively short term
                    (two-year) contract employees, causing a lack of continuity and also
                    from the lack of an effective training program for local personnel.
                    The lack of continuity has resulted in an inconsistent policy toward
                    right-of-way acquisitions.

                    Public meetings should be arranged in cooperation with the Office of
                    Samoan Affairs before a final selection is made of the right-of-way
                    route in the village or villages affected. The public meeting will
                    help identify the landowners, problems with the selected route, and
                    problems in obtaining land values and lease rentals in the area by the
                    appraisers.

                    The Department of Public Works needs to staff the Right-of-Way Branch
                    with trained personnel as required for efficient and prompt right-of-
                    way acquisitions. Whenever necessary, long-term (e.g., five year)
                    contracts of employment could be made with skilled personnel to
                    maintain continuity in the Right-of-Way Branch.

                    The Office of the Territorial Registrar needs to adopt indexing systems
                    that will increase the efficiency of retrieving land sale records,
                    leases, easements, condemnation and right-of-way acquisitions.

                    Legislation to require the mandatory posting of a bond or surety to
                    secure temporary restraining orders seeking to restrain right-of-way
                    acquisitions is needed.

                    DISTRIBUTION SYSTEM

                    The distribution system is the weak link in the existing A.S.G. water
                    system. Residential consumption rates averaging 285 gallons per
<pb n="30" />

        capita per day have been estimated in the existing services. This
        high consumption is due primarily to leakage and waste in unmetered
        and illegal connections. Excess water consumption is a burden on the
        existing transmission, pumping, and storage facilities to the extent
        that the system has not operated correctly.

        The existing distribution system consists of small diameter pipelines
        that branch off of the main transmission pipelines into the communities.
        Pipelines and meters are indiscriminately placed. The meters are
        difficult to locate, to read, and to repair; and it is sometimes
        nearly impossible to relate a specific meter to any given house.

        Distribution pipelines wander throughout villages above and under-
        ground, and it is difficult to determine which lines are metered and
        which are not. Illegal connections are simple to make and hard to
        police. Repairs to pipelines are sometimes difficult as no rights-of-
        way exist for most distribution pipelines.

        The A.S.G. has recently begun an extensive five to ten year program to
        completely rehabilitate the existing A.S.G. distribution system. To
        be successful, the program needs support from the Governor's office
        and the local legislature. Initially, the program may not be popular,
        because right-of-way will be required for the new distribution system
        and many residents who now receive free or low flat rate water service
        will be required to pay. Overcoming the initial public resistance
        will be the first problem faced by the program. A comprehensive
        public education and public information program is required. If the
        importance of the program is communicated and results in the form of
        improved water service are demonstrated, then subsequent efforts will
        be made easier.

                                          11-6
<pb n="31" />

                     The objectives of the rehabilitation program are as follows:

                           1.   To reduce water waste and misuse
                           2.   To facilitate water system maintenance and repair
                           3.   To reduce operating costs
                           4.   To provide better fire protection
                           S.   To provide equitable water use charges to all water

                                system customers

                     EXPANSION OF THE A.S.G. WATER SYSTEM

                     A workable policy toward expansion of the A.S.G. water system service
                     area needs to be developed. Any proposed expansion should be proceeded
                     by detailed studies that identify the increased demands that will be
                     borne by the management, operational, and water supply resources of the
                     existing system. These studies should also evaluate the ability of the
                     existing system to meet these new demands and as required, recommend
                     where improvements are necessary. No expansion should be attempted
                     until the water system has the resources to provide reliable water
                     service.

                     Any expansion into areas served by village systems must consider the
                     desires of the residents of these areas and be consistent with the
                     overall A.S.G. policy toward village water systems.

                     WATER SUPPLY DEVELOPMENT

                     Ground water is recommended for development as the primary source of
                     potable water. The consistently high quality of ground water develop-
                     able at a relatively low cost makes ground water the most desirable type
                     of water source. A separate study of surface water resources (Dames &amp;
                     Moore, 1978) indicated that approximately 164 million gallons of storage

                                                        11-7
<pb n="32" />

           would be required for each million gallons per day of regulated
           flow. A storage reservoir of this magnitude in Samoa would
           require a dam approximately 200 feet high. Preliminary estimates
           indicate that ground water resources of the Tafuna-Leone Plain
           are sufficient to supply the demands of an expanded A.S.G. water
           system through the year 2000. The development of this resource
           should be undertaken with care, however, to insure that it is not
           over-developed.

           More specifically, the recommendations for the management and
           development of the ground water resources are as follows:

                1.   Avoid over-development of the basal freshwater lens in
           the Tafunafou area by directing ground water development programs

           to other areas.

                2.   Investigate the potential of the Malaeimi and Malaeloa
           valleys which appear to be promising areas as supplemental sources
           of ground water for the central A.S.G. system.

                3.   Conduct a ground reconnaissance survey of villages
           outside the existing,goveTTment system to identify and inventory
           those which are eligible for further ground water exploration.

                4.   Institute a program to seal abandoned and unsealed
           drilled holes and wells and to assure that production and obser-
           vation wells in use have adequate sanitary seals.

                5.   Select production well sites above, or upstream, of
           anticipated sources of contaminants, insofar as possible, to
           minimize the need for strict watershed management and conflicting

           land uses.

                                             11-8
<pb n="33" />

                          6. 'Coordinate waste collection and dispos  al (wastewater
                     and solid waste) and land use practices and plans to assure
                     protection of ground water supplies.

                          7.   Maintain the qualified technical expertise required in
                     the engineering, design, and construction of wells to fit the
                     particular hydrology and geology of subsurface conditions encoun-
                     tered at each individual well site and to oversee the mechanical
                     aspects of well drilling.

                          8.   Develop a hydrologic budget for the island of Tutuila.
                     A hydrologic, or water budget is a method of quantifying the four
                     phases of the hydrologic cycle (i.e., precipitation, evaporation
                     and transpiration, surface water and ground water) and their
                     interactions for a given area. It is particularly useful in
                     managing water supplies and in evaluating and forecasting the
                     impacts of certain actions (e.g., dry spells, projected growth
                     and demand, etc.) on each hydrologic component.

                     COLLECTION OF ADDITIONAL DATA AND ADDITIONAL STUDIES

                     The basis for recommendations of the specific improvement items
                     contained in this report is, as of necessity, based upon es timates
                     of water production capabilities and water consumption requirements
                     available at the time of this writing. The water system management
                     has in the past maintained insufficient field operational data on
                     the system. In the future, more detailed information of flow
                     rates, flow rate variations, and pressure distribution must be
                     collected at all critical points in the system. These data
                     should be periodically analyzed to determine the most efficient
                     sizing and location of proposed improvements and the most efficient
                     operational procedures.

                                                       H-9
<pb n="34" />

           As noted in Chapter I, the scope of this assessment is limited to
           documenting and evaluating all ongoing and currently proposed
           A.S.G. water systems improvement programs. Hence, the specific
           recommendations contained herein do not comprise a complete water
           plan for the territory.

           In view of the fact that current water system improvements are
           only planned through 1981 and in light of the findings of this
           assessment, a long-range (e.g., 25- or 50-year) water plan to
           guide future development and to minimize the recurrence of past
           problems is highly recommended. In formulating this plan, such
           subjects as alternative methods for developing village water
           systems, the identification of area-by-area future water demands,
           alternative sources of water to meet future demands, and an
           investigation of federal requirements as they apply to villages
           and the A.S.G. system could be addressed. Coordinated improvements
           with economic development, waste disposal and other planning
           activities would also be part of the long-range water plan.

                                             II-10
<pb n="35" />

                       8. Develop a hydrologic budget for the island of Tutuila.
                  A hydrologic, or water, budget is a method of quantifying the four
                  phases of the hydrologic cycle (i.e., precipitation, evaporation
                  and transpiration, surface water and ground water) and their
                  interactions for a given area. It is particularly useful in
                  managing water supplies and in evaluating and forecasting the
                  impacts of certain actions (e.g., dry spells, projected growth
                  and demand, etc.) on each hydrologic component. It requires
                  extensive data collected through well-conceived monitoring programs
                  over extended periods.

                  COLLECTION OF ADDITIONAL DATA AND ADDITIONAL STUDIES

                  Studies and plans are necessary for the orderly development of
                  expanding facilities like water systems. These plans are, however,
                  based upon data as of a given point in time and projections of
                  future events. Future events cannot be predicted with certainty
                  and the longer the projection, the less the certainty. Studies
                  and plans, therefore, have a "shelf life" that is considerably
                  shorter than the life of the facilities that they planned.

                  The basis for recommendation of the specific improvement items
                  contained in this report is, as of necessity, based upon estimates
                  of water production capabilities and water consumption requirements.
                  The water system management has in the past maintained insufficient
                  field operational data on the system. In the future, more detailed
                  information of flow rates, flow rate variations, and pressure
                  distribution must be collected at all critical points in the
                  system. This data should be periodically analyzed to determine
                  the most efficient sizing.and location of proposed improvements
                  and the most efficient operational procedures.

                                                  TI-11
<pb n="36" />

                  The existing planning for water system improvements is currently
                  extended only through 1981. There is a need for long term planning
                  that will guide future water system development. This planning
                  should address itself to subjects such as identification and
                  evaluation of alternate water sources, identification of area by
                  area future water demands, investigation of alternate methods
                  for developing village water systems, and an investigation of
                  federal requirements as they relate to village and the A.S.G.
                  system. The planning effort needs to set out a logical year
                  to year development sequence for the future water system
                  improvements.

                                                 11-12
<pb n="37" />

  a

                                      CHAPTER IH
               THE EXISTING SYSTEM, ONGOING
       AND PROPOSED IMPROVEMENT PROGRAMS
<pb n="38" />

                                                 CHAPTER III

                                         THE EXISTING SYSTEM, ONGOING

                                      AND PROPOSED IMPROVEMENT PROGRAMS

                   HISTORICAL OVERVIEW OF SYSTEM

                   There is no evidence of any organized water systems in American Samoa
                   prior to the first contacts with the outside western world. Water was
                   evidently obtained directly from surface streams and springs. During
                   times of drought, those villages and areas without perennial streams
                   no doubt obtained drinking water from coconuts and used the ocean to

                   bathe in.

                   The first organized community water system was probably constructed
                   to serve the early United States coaling station near Fagatogo. A water
                   service agreement recently discovered by the Department of Public Works
                   shows an agreement between the U.S. Navy and Fagatogo Village dated
                   August 23, 1899, and indicates one of the earliest attempts to obtain
                   water rights to serve the Navy base.

                   Periodic expansion to the coaling station and World War II brought on
                   the first significant attempts to develop and distribute water in
                   American Samoa. During this period the Pago Pago well shaft was con-
                   structed and a 10-inch pipeline was laid to the ship repair yard (at
                   the present site of the tuna canneries and marine railway), a stream
                   intake was constructed on Vaipito Stream above Pago Pago Village and
                   a pipeline extended to the vicinity of Happy Valley, the Upper Fagaalu
                   Dam was constructed together with a hydroelectric power generation plant
                   at Fagatogo, a stream intake was constructed on Vaitele Stream to supply
                   water to the airfield at Tafuna, a stream intake was constructed on
                   Leafu Stream to serve the airfield at Leone, and several other miscel-
                   laneous improvements were made to the water systems of villages (Tula,
<pb n="39" />

                   Pago Pago, Aua, Nuuuli and Amanave) that had military personnel stationed

                   in them.

                   From the end of World War II until 1960, very little, if anything was
                   done to improve the wate,'r supply systems of American Samoa. When the
                   U. S. Department of Interior took responsibility for administration
                   of the Territory in 1950, the Territorial Government (A.S.G.) assumed
                   responsibility from the Navy for operation and maintenance of the water
                   systems. The primary emphasis was on those systems that served govern-
                   mental facilities. By the villagers own choice and by governmental
                   policy not to interfere, the villages maintained control over village
                   systems that served the local population.

                   Beginning in the early 1960's, American Samoa began its rapid transition
                   from a villages subsistence economy to a cash economy. During this
                   period, the Tafuna International Airport was constructed, the roadway
                   connecting each end of the island to Pago Pago along the south shore
                   was completed and the tuna canneries offered the first major opportunity
                   for employment outside of government service. These improvements brought
                   about changing life styles and together with an expanding population
                   (from 6,000 in 1900 to nearly 30,000 in 1974) brought water shortages

                   and demands for a more reliable water service.

                   In response to these demands, the A.S.G. had the first master plan for
                   the water system prepared. This report (Austin, Smith &amp; Associates,
                   1963) noted the increasing population and water needs in American Samoa
                   and recommended that improvements be made to the old Navy system.

                   The 1963 report identified the inability of the existing surface water
                   systems to meet peak demands and recommended the construction of nearly
                   seven million gallons of distribution storage reservoirs, the construction

                                                     111-2
<pb n="40" />

                   of various 6-inch and 8-inch diameter transmission pipelines and the
                   construction and further investigation of ground water sources. Based
                   upon this 1963 report, the A.S.G. designed and'built the following
                   improvements: (See Figure III-1 for general locations)

                        1.   The 6-inch pipeline from Atuu to Leloaloa
                        2.   The 1.0 million gallon reservoir at Pago Pago
                        3.   The 2.25 million gallon reservoir (stilling basin) and filters

                             at Vaipito Stream
                             The 8-inch pipeline from Pago Pago to Happy Valley
                        5.   The Pago Stream well (since abandoned)
                        6.   The Fagatogo booster pumps and pressure filters
                        7.   The 1.0 million gallon reservoir at Fagatogo (Maugaalii Reservoir)
                        8.   The 1.0 million gallon reservoir at Blunts Point
                        9.   The 4.5 million gallon reservoir at (Virgin Falls) Fagaalu
                       10.   The lower Fagaalu Stream intake and pressure filters
                       11.   The 8-inch distribution pipeline from Fagaalu to Utulei
                       12.   The Papa Stream well (since abandoned)
                       13.   The 6-inch distribution pipeline from the Papa Stream well
                             to the Tafuna A.S.G. housing area

                   These improvements were limited to areas containing A.S.G. facilities

                   and in which the A.S.G. had some control over right-of-way. Villages
                   along the systems were allowed to connect to the systems if they desired.

                   After 1964, the water systems were not improved to any extent until

                   approximately 1970. In 1970, there was a cooperative attempt between
                   the A.S.G. and the villages to improve the old Navy system in the Leone
                   area. The improvement was of limited success, however, because it was
                   not fully completed. Pipeline and storage reservoirs were constructed
                   in the villages of Leone, Malaeloa, Puapua, Taputimu and Vailoatai.

                                                    111-3
<pb n="41" />

          The surface water supplies had inadequate quantity in the dry season
          and insufficient pressure head to serve all the villages. The villages
          attempted to operate the system on their own, but intervillage disagree-
          ments, the lack of technical and managerial expertise, and limited water
          supplies prevented the system from being operated correctly.

          In 1970, the A.S.G. also began construction of the Lago Puna water
          system. This system ran from its source at Puna Stream through Mapusagafou,
          Pavaiai, Faleniu, Futiga, Iliili and Vaitogi villages. The operation
          of this system proved less than satisfactory, however, because the sole
          source for the system (Puna Stream) had inadequate supply during the
          dry season. The later addition of wells at Iliili has helped the situa-
          tion, but lack of back up facilities and operational problems have created
          continued water shortages.

          The FY 1971 Water System Expansion Program was in three separate locations
          on Tutuila Island. In the Western District it was planned to improve
          and extend the Leone Water System as far west as Atauloma. Unfortunately,
          because of insufficient funds, it was only possible to construct the
          system from Asili westward to Atauloma. (See Figure 111-3)

          In the eastern district, a pipeline from Auto to Alofau was planned
          to be constructed. However, the system was only extended from Auto
          to the east as far as Pagai due to insufficient funds and village dis-
          agreements. (See Figure 111-4)

          In the Bay Area (Pago Pago), the A.S. G. water system was extended
          from Leloaloa to the Aua Village School. Insufficient funds also
          prevented the construction of the proposed tanks along this pipeline.

          Low rainfalls in the first half of the 1970's coupled with accelerating
          population and economic growth brought increased attention to the A.S.G.'s

                                           111-4
<pb n="42" />

                  water system planning. In 1972, an updated water system master plan
                  (Austin, Smith and Associates, 1972) was prepared for the Pago Pago,

                  Tafuna and Leone areas.

                  The water system improvement program for 1973 and 1974 followed the
                  recommendations of the 1972 system master plan. New wells were completed
                  at Tafunafou, a 12-inch pipeline was constructed from Nuuuli to Fagaalu
                  Village and two booster stations at Nuuuli and Fagaalu were provided
                  to connect the well field with the Bay Area. As part of the industrial
                  park project, a 12-inch pipeline was constructed to connect the Tafunafou
                  well field with the water system.   These programs interconnected the
                  various portions of the A.S.G. water systems into one water system.

                  Because of continuing problems with quality and quantity of the existing
                  surface water sources, an analysis of the capabilities of the water
                  system to operate solely on ground water was prepared (R.M. Towill Corp.,
                  1975). The FY 1975 Water System Improvement Program was originally
                  designed in accordance with the criteria in this report which assumed
                  that all water used in the Bay Area would be transported from the Tafuna

                  Plains area.

                  Before the design was completed, a separate proposal was made to utilize
                  the Olovalu Crater to store large quantities of surface water and to
                  transport the water into the Bay Area via a high pressure gravity system
                  that used large diameter pipelines and no intermediate booster pump
                  stations (CH2M-Hill, 1975). The A.S.G. decided that the construction
                  costs under this Crater Proposal were excessive when compared to ground
                  water development and that ground water should be developed to its maximum
                  first. However, the Olovalu Crater proposal was never formally adopted
                  or rejected. Apparently the pipeline sizes in the 1976 system were
                  somewhat affected by the Crater Proposal on the chance that the proposal
                  may be adopted at a later date. There is no documented evidence, but

                                                   111-5
<pb n="43" />

                  the size increases are very similar to those recommended in the Olovalu
                  Crater project.

                  The Olovalu Crater has subsequently been used as a borrow site for cinders

                  to such an extent that the crater rim is now breached. The earthwork

                  necessary to repair the breach make the economics of this project even

                  less desirable.

                  The FY 1975 improvement program consisted of pipeline improvements along
                  the main highway from Tafuna to Nuuuli, from Fagaalu to Utulei and from
                  Leloaloa across Pago Pago Park to Siufuga. The FY 1976 and 1977 programs
                  continued the improvements to the transmission capabilities between
                  the Tafuna well field and the canneries and provided additional distri-
                  bution storage.

                  The FY 1976 and FY 1977 capital improvements program contained the follow-
                  ing transmission and storage projects:

                       1.   Pipelines between Mapusaga and Tafuna (16 and 20-inch diameter)
                       2.   Pipelines between Siufuga and Atuu (12-inch diameter)
                       3.   Pipelines between the Airport and Iliili (16-inch diameter)
                       4.   Pipelines between the Industrial Park and the Airport (16-
                            inch diameter)
                       5.   Pipelines at Fagaalu Park (20-inch diameter)
                       6.   Water storage tank at Mapusagafou (0.50 million gallons)
                       7.   Water storage tank at Pavaiai (0.75 million gallons)
                       8.   Water storage tank at Aua (1.0 million gallons)

                                                   111-6
<pb n="44" />

                  EXISTING AMERICAN SAMOA GOVERNMENT WATER SYSTEM

                  General

                  The existing A.S.G. water system extends from Aua Village in the east
                  to Futiga Village in the west (Figure III-1). The A.S.G. water system
                  is distinguished from village water systems in that it is operated
                  and maintained by the Department of Public Works and it is recognized
                  by the residents as A.S.G. owned. Generally customers receiving water
                  from the A.S.G. system are charged a fee, either flat rate or by metered
                  consumption. In contrast, village systems are theoretically owned and
                  operated by the villages and generally do not charge for water service.

                  Within this area serviced by the A.S.G. water system and in all other
                  villages, there are also numerous private individual family or village

                  water systems. Residences are frequently connected into one of these
                  private systems as well as the A.S.G. system, and residents utilize
                  the free water service in the private system when adequate supplies

                  are available.

                  The A.S.G. has an unofficial interest in the operation of many of the
                  outside village water systems that attempt to maintain water service
                  to the A.S.G. facilities within villages (Table III-1). In these systems,
                  the A.S.G. does not provide an active maintenance role, but responds
                  to requests for assistance when water service fails.   These requests
                  often become demands, since necessary facilities such as schools, offices,

                  and similar A.S.G. facilities are forced to shut down when water becomes

                  unattainable.

                  The A.S.G. participated in or completely paid for construction of some
                  of the water facilities in Asili, Leone and Fagaitua, but does not

                                                   111-7
<pb n="45" />

                                                   ASSESSMENT OF WATER SYSTEMS

                                                          AMERICAN SAMOA

                                                          TABLE 111-1

                                    INVENTORY OF AMERICAN SAMOA GOVERNMENT

                                                  FACILITIES IN VILLAGES

                        VILLAGE                DESCRIPTION OF FACILITIES                       REMARKS
                        Poloa, Nuo             Elementary school                               Served by
                        Ataulorna              Employee housing                                village water
                                                                                               system
                        Leone                  Dispensary, offices, fire station,
                                               elementary school, high school,
                                               experimental farm,    employee housing
                        lliili, Pavaiai,
                        Aoloaufou              Elementary schools                              Served by
                        Mapusaga               Community college,                              American
                                               employee housing                                Samoa
                                                                                               Government
                        Tafuna                 Elementary school,    airport, power            water system
                                               station, construction offices
                                               and equipment, industrial park,
                                               offices, employee housing
                        Fagaalu                Hospital, elementary school,
                                               employee housing
                        Utulei                 Housing, offices, high school,
                                               elementary school, T.V. studio
                        Fagatogo               Housing and offices
                        Pago Pago              Offices, elementary school
                        Satala                 Power station, marine railway
                        Aua                    Elementary school
                        Fagasa, Vatia,
                        Lauliituai             Elementary schools                              Served by
                        Fagaitua               High school, post office,                       village water
                                               employee housing                                system
                        Alofau                 Elementary school
                        Amouli                 Dispensary
                        Tula, Aoa,
                        Masef au               Elementary schools
                        Aunuu                  Elementary school,
                        Ofu, Olosega,          dispensary
                        Faleasao               Elementary schools, dis-
                                               pensaries, power stations                       Manua Islands
                        Luma                   High school                                     water system
                        FitiUtG                Elementary school
                                                                111-8
<pb n="46" />

                  actively operate or maintain them except in Leone where a minor A.S.G.
                  center has developed. The A.S.G. has drilled and maintains several
                  wells in the Leone area to provide water to the A.S.G. facilities and
                  in the process, supplies most of the water to the system.

                  Sources

                  The existing A.S.G. water supply system is supplied by both surface

                  and ground water sources. The older Navy water system relied almost
                  entirely on surface water supplies. Since the early 1970s, the A.S.G.
                  has relied more heavily on ground water. The existing surface water
                  supplies with estimates of the average flow rates and minimum observed
                  flow rates are shown in Table 111-2. Only the Fagaalu intake water
                  is metered; the other figures shown are estimated.

                  Ground water supplies are now the major sources of water for the A.S.G.
                  system, primarily from drilled wells in the Malaeloa, Iliili and Tafunafou
                  areas of the Western District. The current major production wells are
                  shown on Figure 1 and in Table 3 of Appendix B. Smaller quantities
                  of ground water are obtained from a shallow dug well in Utulei and a
                  dug shaft with a collection gallery in Pago Pago Valley.

                  Treatment

                  The treatment of ground water is limited to simple chlorination at the
                  Tafunafou well field and the Utulei dug well. All other wells are

                  untreated.

                  The surface water sources from Vaitele, lower Fagaalu and upper Fagaalu
                  intakes have pressure filters and chlorination. The Vaipito intake
                  has gravity filtration through three valveless gravity filters and

                                                   111-9
<pb n="47" />

                                            ASSESSMENT OF WATER SYSTEMS

                                                   AMERICAN SAMOA

                                                    TABLE 111-2

                                  EXISTING AMERICAN SAMOA GOVERNMENT

                                           SURFACE WATER SOURCES

                                                                                        Estimated  2
                                                          Estimated                      Minimum
                                                            Average                     Dry Season
                                                              Flow                         Flow
                      SOURCE                                 (GPM)                        (GPM)

                      Fagaalu Intake                            220                            0
                      Puna Dam                                   50                            0

                      Vaitele Intake                            300                           50
                      Upper Fagaalu  Reservoir                  250                         100
                      Vaipito Intake (Utumoa)                   220                         100
                      Malaeloa Intake                           150                           50

                      Leone Intake                              200                         100

                                                               1390                         400
                      1Estimated flows, no meters except for Fagaalu intake.
                      2Based upon reported observations during the 1971 and 1974 dry seasons.

                                                        III-10
<pb n="48" />

                  chlorination. The Puna intake has only chlorination facilities; the

                  Malaeloa and Leone intake waters receive no treatment.

                  Generally, all of the existing treatment equipment is inadequate and
                  unreliable for the treatment of potable water.

                  Service Levels

                  Because of ground elevation differences within the A.S.G. water system,
                  the system is broken into four service areas (See Figure III-1). The
                  highest service area contains the village of Mapusagafou and runs from
                  elevation 390 to 590. Water supplies for this area are obtained from

                  the Puna intake.

                  The next lowest service area contains the villages of Futiga, Iliili
                  and part of Pavaiai. Water supplies for this area are obtained from
                  the drilled wells at Iliili. The village of Vaitogi is fed by water
                  dropped from Iliili through a pressure reducing valve.

                  The villages of Mapusaga, Faleniu and part of Pavaiai are fed from wells
                  number 67 and 69 at Malaeimi and the new Mapusaga (ASCC) booster station

                  which lifts water from the Tafunafou well field.

                  The bulk of the area from Tafuna to Aua is in the lowest service level

                  and is fed from the Tafunafou well field and the surface water sources.

                  The upper portions of Pago Pago and Fagatogo villages are served from
                  the stream sources in the respective valleys.
<pb n="49" />

                   EXISTING VILLAGE SYSTEMS

                   General

                   There is no evidence of any village water system improvements in Ameri-
                   can Samoa prior to 1900. The water needs of early Samoa were normally
                   met at streams, springs, or along the ocean shore. In times of extreme
                   drought, the ocean was used for bathing and the coconut provided liquid
                   for drinking.

                   During the 50 years of Navy administration, it was the policy to stay
                   out of local affairs and consequently, little development of village
                   resources resulted during this administration.

                   Outside of the Bay Area, the earliest water systems were constructed
                   during World War II. Evidence of these systems can be seen in Tula,
                   Amuuli, Aua, Nuuuli, Leone, and Amanave villages. Each of these vil-
                   lages had some sort of an American military base or personnel stationed
                   in them, and the water systems are a result of their presence.

                   Up until the 1960's, these village water systems were the most advanced
                   form of water systems outside of the Bay Area. By the 1960's, most
                   of the villages had made some improvements, but they were normally on
                   an individual family basis and were not village-wide. The improvements
                   normally consisted of development of springs and streams with small
                   diameter pipelines (under two inches) for water delivery. No provision
                   for water treatment and little or no water storage capacity were pro-

                   vided.

                   For most of the village communities located outside of the A.S.G. water
                   system, the most common water system developments are small re,servoirs

                                                   111-12
<pb n="50" />

                  or catchments formed by concrete dams built across streams. Occasionally,
                  a few families developed a hillside spring for their own use.

                  The storage capacity of the catchments are small (100 to 10,000 gallons).
                  Many villages also have 5000 to 30,000 gallon concrete or wooden tanks
                  for storage outside of the catchment. Water is piped directly from
                  the catchment or reservoir to the consumer's tap using small (1/2 to
                  6-inch) diameter galvanized iron or plastic pipes.

                  In most villages, there are several separate water systems belonging
                  to several individual families within the village. These systems have
                  sometimes been interconnected and form complex systems within the village.

                  Current Situation

                  There is little or no mapping of village water systems. For the most
                  part, the systems have evolved bit by bit over the years without any
                  planning. Partial information on the sources and layout of existing
                  village water systems is available in R.H. Dale's Inventory of Village
                  Water Systems in American Samoa, 1970 and Inventory of the Economic
                  Development Administration Village Water System Program, 1975 by URS/
                  The Ken R. White Company.

                  Just a decade ago, it was common for each village to have only a few
                  outdoor outlets, consisting of 3/4-inch pipe risers four to six feet
                  high and bent at the top to direct water downward. The fortunate fami-
                  lies had one or even two of these outlets to themselves. All washing
                  and bathing was done at these pipe risers.

                  Within the past few years, the situation has changed completely. In
                  addition to the existing pipe risers, many of the homes (now predomi-
                  nantly Western style), have some form of indoor plumbing. Some of the

                                                   111-13
<pb n="51" />

                  village families still use the outdoor risers and basins for washing
                  clothes or for bathing. Privies are found in the outlying villages,
                  but have been replaced in many areas by the high water consuming flush

                  toilets.

                  Contamination of water supplies is still a serious threat to the village
                  water systems. During heavy rainstorms, stream catchments and reservoirs
                  are subject to high silt and debris loads. The steep slopes within
                  the watersheds are cultivated by villagers and often foraged by pigs.
                  The watersheds do not contain any industry within their boundaries,
                  but because of limited land area, dwellings are beginning to encroach
                  on the watersheds. The lack of water treatment in the village systems

                  compounds the contamination problem.

                  Beginning in the 1960's, the A.S.G. began taking more interest in village
                  water systems due to construction of schools, dispensaries or other
                  A.S.G. operated facilities in many of the villages. To provide water
                  to these facilities, the A.S.G. improved existing facilities or con-
                  structed new water systems with minimal capacity. These systems became
                  a part of the village systems, and they soon were used by the village
                  as well as the schools and dispensaries.

                  In 1970, a combination of an extremely low rainfall, increased popula-
                  tion and increased standards of village living focused the first real
                  attention on village water systems. This attention resulted in the

                  A.S.G. securing a grant for improvements to village water systems from
                  the Economic Development Administration. The A.S.G. has since applied
                  for an additional grant from the Economic Development Administration.

                                                   111-14
<pb n="52" />

                  EXISTING DESIGN CRITERIA

                  The design cviteria used in past A.S.G. water system master plans and
                  subsequent A.S.G. facilities design are summarized in Table 111-3.
                  With the exception of the 1963 report, the criteria used to determine
                  water demands and the calculated water demands are fairly consistent
                  and have comparable results. Direct comparisons of the various criteria
                  can not be made as each is based upon different assumptions for the
                  future of the system.

                  The 1963 report was prepared at the very beginning of American Samoa's
                  unprecedented economic growth and population expansion and did not
                  anticipate the rapid growth of the 1960-1978 era. During the decade
                  1950 to 1960, the population of American Samoa grew less than 1% per
                  year. In 1963, it would have been very difficult to foresee what has
                  happened in Samoa over the past fifteen years. At that time there was
                  very little or no past supportive data to work with concerning the
                  operating characteristics of the water system or population projections.
                  Each succeeding report had the advantage of additional background data.

                  The proposed A.S.G. water system has expanded from a system that served
                  only A.S.G. facilities to one that will serve most of the population

                  on the south shore of Tutuila Island. Before the advent of the recent

                  Safe Drinking Water Act, it would have been difficult to foresee the
                  A.S.G. becoming involved in village water systems to the extent that
                  it is today. The criteria is constantly changing; more and more areas
                  are being served with higher quality water on a more consistent basis

                  each year.

                  The existing surface water sources have become less important to the
                  system over.the years. The economic considerations concerning providing
                  improved treatment facilities for these sources to obtain a consistently

                                                   111-15
<pb n="53" />

                                                                ASSESSMENT OF WATER SYSTEMS

                                                                        AMERICAN SAMOA

                                                                           TABLE 111-3

                                                       COMPARISON OF PAST DESIGN CRITERIA

                                          0

                                   a

                                          C;
                                     0                                                                             2
                                     0    @t        Design            Design Population Projections and Design
                                          0         Service                   Peak Flow Rates (MGD)
               Report           0  a-     &lt;.S       Area               1970      1980        1990       2000       2010          C(

              Austin-Smith       180    0.252     Tafuna to           7,500    8,800      10,000      11,500     12,500      Prepa
              Assoc., 1963                        Leloaloa            (1.9)    (2.25)      (2.5)       (2.8)       (3.2)     begin
                                                                                                                             unpre
                                                                                                                             tion (
                                                                                                                             growt

              Austin-Smith       150    1.650     Leone to                     27,000     37,000      46,000                 Noted
              Assoc., 1972                        Breakers   Pt.               (5.6)       (7.8)                             tion i
                                                                                                                             tinue(
                                                                                                                             Reco
                                                                                                                             ment
                                                                                                                             trans

              R.M. Towill        150    2.124     Tafuna to                    12,730     16,413                             Noted
                 1975                             Breakers Pt.                 (5.7)       (6.9)                             pipe
                                                                                                                             sourc

              CH2M-Hill          200    2.16      AmGnave to                                                     49,200      Pipe
                 1975                             Breakers Pt.                                                    (12.0)     sourc
                                                                                                                             Bay /
              Flanagan  1        180    1.2       Most of                                 36,900                 48,200      No b(
                 1976                             South Shore                              (7.6)                 (9.9)       criter
                                                                                                                             desigr
                 See Table 1-4 for breakdown.
              2  Populations and peak flow rates are not        directly comparable between reports due to different
                 service areas.
<pb n="54" />

                                                                 ASSESSMENT OF WATER SYSTEMS

                                                                         AMERICAN SAMOA

                                                                          TABLE 111-4
                                                      EXISTING WATER SYSTEM DESIGN CRITERIA
                          Area                                      Population                         Average Day_Water D
                                                        1974            1990           2010              1974.          1990
                     West of Leone                      1844            2200            2600            (0.33)         (0.40)
                     Leone System                       3633            5250            7200            (0.65)         (0.95)
                     Logo Puna System                 38  61            5499            7600             0.70           0.97
                     Tafuna     Nuuuli -
                     .Matuu                            3738             5200            7000            0.67            0.94
                     Fagaalu     Fagatogo              3665             4750            6050            0.66            0.85
                     Pago Pago - Aua                   6070             7850           10,000            1.09           1.41
                     Existing canneries                 --              --              --              0.70            0.75
                     Allowance for new
                        industry                       --               --              --                --            0.25
                     Eastern district                  4515             6100            7700           (0.81)           1.10
                     TOTAL                           27,326          36,849           48,150            5.61            7.62
                     Not in present service area                                                       (1.79)
                     Net water demand                                                                   3.82

                     Source: American Samoo's Water System Improvement Program, Matthew J. Flanagan, 1976
<pb n="55" />

              high quality water has become less and less desirable. Reevaluation
              based upon availability, quality and cost-effectiveness of water sources

              has dictated that more and more water be obtained from groundwater
              wells outside of the Bay Area, and this has increased the required size

              and extent of the transmission mains needed to move water from the well

              field to the Bay Area.

              ONGOING AND PROPOSED A.S.G. WATER SYSTEM IMPROVEMENTS

              The proposed water system capital improvement program  for 1977 to 1981,

              as prepared by the A.S.G. is listed in Table 111-5 and illustrated on
              Figures 111-3, 111-4, and 111-5. Project item numbers are keyed to
              Figures 111-3, 111-4, and 111-5 for convenience in listing them. The
              status of each project is listed as of April 1978. A brief item by
              item discussion of this.program is as follows:

                   Item No. 1. Tafuna and Mapusaga Pipelines: These pipelines run
                   along the main highway from the village of Mapusaga to the airport

                   road turnoff and down the access road to the Tafunafou well field.

                   The project is under construction and is scheduled to be completed
                   by June, 1978. The pipeline is 16-inches in diameter along the
                   road to the well field and along the highway toward Mapusaga.
                   The pipeline is 20-inches in diameter along the main highway east

                   of the airport road turnoff.

                   Along the main highway, the new pipeline is interconnected with
                   the existing 8-inch pipeline and provisions have been made for
                   installation of a booster pump station (see item 13) near the
                   American Samoa Community College (A.S.C.C.). The   future booster
                   station will be used for lifting water up to the second service
                   level to provide water for the villages of Mapusaga. and Faleniu.

                                               111-18
<pb n="56" />

                                                                                                         ASSESSMENT OF WATER SYSTEMS
                                                                                                                 AMERICAN SAMOA

                                                                                                                  TABLE 111-5
                                                                                        PROPAqFr) A.S.G.         CAPITAL IMPROVEMENT PROGRAM

                                                                                           Project     Fiscal          Fi scal
                                 No.     Project Name                                        No.         Year          Year '78           Fiscal Year '79             Fiscal Year '80          Fiscal Year '81
                                 "em         PIPELINES                                                              A M J JA S ONDJF 'A A M J J A SJOND JF M AM J J A S OND J F PA A M
                                         TAFUNA/MAPUSAGA 20" &amp; 16"                         760074         76        33
                                         WELL 110 AICC 11"                                 110082         76
                                 3       IND. PARK/FAA/ILIILI                              760603         76
                                 4       ATUU TO LELOALOA                                  770495         76                       3M
                                 5       AIRPORT FEEDER                                    780106         76
                                 6       PAGO TANK ROAO/SIUFAGA 12"                        780114         76
                                 7       WESTERN LOOP 12"                                  770230
                                                                                           770339         76                       TrrTTrrrrrT7rrrrrrm
                                 8       MAPUSAGA/ALOAUFOU 8"                              780098         76
                                 9       AUMA/AMANAVE 8"                                   780155
                                                                                           780189         77                                                    moorTTTrrrrrrrrrrm
                                 10      UTULEI TO MARKET 20"                              780395         78
                                 I I     MARKET TO MALALOA 16"                             790xxx         79
                                 12      AUA/AUTO 8"                                       790xxx         79                                                                                                 fill

                                             BOOSTER STATION
                                 @
                                 3       MAPLISAGA (ASCC)                                  760090         76
                                 4       PAVAIAI BOOSTER PUMP                              770172         77
                                 15      MAPUSAGAFOU BOOSTER PUMP                          770412         76
                                 16      FIVE PLACES                                       780387         78

                                             RESERVOIRS
                                 17      PAVAIAI .75 MG                                    770255         77        351!301111la                 nTrrrTrITrM
                                 is      MAPUSAGAFOU .5 MG                                 770420         77        izMEINIKI      ......... i   rTTTrTm-M
                                 19      AUA 1.0 MG                                        770487         76        ZER@
                                 20      LEONE     3.0 MG                                  760504         76                                         M f        TrrTTrrrrTn
                                 21      FUTICA .75 MG                                     8OOxxx         so                                      mi-11-ii
                                 22      ASILI                                             780225         77

                                             WELLS &amp; PUMPS
                                 23      EXPLORATORY/TEST                                  770602         77
                                 24      FY-76    HUD PROGRAM                              760025         76
                                 25      FY-77    DOIPROGRAM                               780197         77
                                 26      FY-77    HUD PROGRAM                              770404         77                                                        rrrrrrrrrm
                                 27      FY-78    PUMPS                                    7803"          78                             ......  rrTTrrrrrTTrrr
                                 28      FY-79                                             790xxx         79                                                    (ST77,=-lfJJ11 111 111111 1111111
                                 29      SPARE PUMPS                                       770446         77                                      55=55=

                                             REHABILITATION
                                 30      EXISTING RESERVOIRS (4)                           760496         76           nTrrrrrmT
                                 31      EXISTING FILTERS (10)                             770594         76        3000000yo,
                                 12      FAGATOGO VILLAGE                                  760131         76        MMMII 1=1127=1
                                 33      UTULEI VILLAGE                                    780130         76                                      TI7f7ZZ7;!ZM
                                 34      PAGO PAGO VILLAGE                                 780148         76                       -1                           so
                                 35      NUUULI VILLAGE                                    780122         76                                                      .........

                                             TREATMENT

                                 36      WATER PURIFICATION                                760520         76
                                 37      CHLORINATOR CONVERSION                            780213         77        T@7@@ 1111111 1 MIT=
                                 38      RECHLORINATION                                    780221         77                           ESSMANNE@=
                                 39      FACILITIES                                        780xxx         78                                             KK=
                                 40      TREATMENT FACILITIES                              790xxx         79                                                           rrrrrrrrrTT-rrrr,

                                             MISCELLANEOUS
                                 421     LEAK DETECTION                                    770321         76
                                 4       MALAEIMI PIPELINE                                 770171         76                                 ESSSSSWEENOW EA
                                 43      O&amp;M MANUALS                                       770586         76
                                 44      METER PROGRAM                                     780209         77
                                 45      MISC. IMPROVEMENT FY-77                           780247         77
                                 46      M@SC. @MPROVEMENT FY-78                           780xxx         78                       r3palogym
                                 47      M SC. MPROVEMENr FY-79                            790xxx         79                                 05=5m

                                 f=      DESIGN, IN-.0UIE                      OEM 1011STRUCTION, FORCE ACCOUNT                                          Source. Department        ol Public War's
                                         DESIGN BY A/E                                 CONSTRUCTION, CONTRACT                                                       American Samoa Government
                                         BID &amp; AWARD

                                                                                                                       M-19
<pb n="57" />

                       Item No. 2. Well #10 to A.S.C.C.: This 12-inch pipeline will
                       run from the far western,end of the Tafunafou well field (well
                       #10), northerly to the main highway near the American Samoa Com-
                       munity College (A.S.C.C.). The pipeline provides an alternate
                       looped system route for water supply to the system should the well
                       field pipeline fail. The pipeline is scheduled for design in
                       fiscal year 1978. However, right-of-way problems are not solved
                       and the funds may be reprogrammed.

                       Item No. 3. Industrial Park/FAA/Iliili: This project consists
                       of a 16-inch diameter pipeline that extends along the Iliili to
                       Airport Road from Lupelele School in Iliili village to the FAA
                       road near the airport. The pipeline is under construction and
                       is over 50% complete. When completed the pipeline will provide
                       water to a large area of the Tafuna Plain that is presently un-
                       developed.

                       Item No. 4. Atuu to Leloaloa: This project is a 12-inch diameter
                       pipeline that extends along the north side of the harbor from Atuu
                       Village to Leloaloa Village. Construction bids for this project
                       were scheduled to be opened on May 26, 1978. The pipeline will
                       replace an existing 6-inch diameter pipe to provide better water
                       service to the north side of the Bay.

                       Item No. 5. Airport Feeder: This project consists of an 8-inch
                       diameter pipeline that will provide water service to the airport
                       from the new industrial Park/FAA/Iliili pipeline. The project
                       design is nearly complete and construction is scheduled for late
                       in the fiscal year 1978. The pipeline will replace the old, trouble-
                       some World War II 6-inch airport service line.

                                                   111-20
<pb n="58" />

                       Item No. 6. Pago Tank Road to Siufaga: This 12-inch pipeline
                       will extend along the main highway from Pago Pago Village to near
                       the Korea House at Siufaga Village. The project design is nearly
                       complete and construction is scheduled to begin in August of 1978.
                       The pipeline will complete the loop around Pago Pago Park and allow

                       abandonment of the old 10-inch main that was constructed on the

                       ground surface in the 1940's.

                       Item No. 7. Western Loop: This project will consist of an 8-inch
                       and 12-inch pipeline loop and connection to the existing government
                       water system at Futiga. The pipelines will serve the villages
                       in the Leone area. The project is scheduled to be under design
                       in July of 1978 and construction is scheduled to start near the
                       end of 1978. The pipeline will provide water service to the vil-
                       lages of Pua Pua, Malaeloa, Taputimu, Leone and Vailoatai.

                       Item No. 8. Mapusaga to Aoloaufou: This project will consist
                       of an 8-inch pipeline that will extend the A.S.G. system from the
                       village of Mapusagafou to the village of Aoloaufou. Design is
                       scheduled to begin in July 1978. The project will provide water
                       service to the rapidly growing area above Mapusagafou.

                       Item No. 9. Auma. to Amanave: This 8-inch pipeline project will
                       extend the A.S.G. water system from Leone Village to the western
                       tip of the island at Amanave Village. Design is scheduled to begin
                       in January of 1979, and the project is projected to be completed
                       in 1980.

                       Item No. 10. Utulei to Market: This proposed 20-inch pipeline
                       will extend from Utulei Village to the market at Fagatogo Village.
                       When completed, this segment will eliminate the use of the salt

                                                   111-21
<pb n="59" />

                        water fire system as a fresh water transmission pipeline.   The
                        pipeline is scheduled for construction in early 1980.

                        Item No. 11. Market to Malaloa: As the project title suggests,
                        this project will consist of a 16-inch diameter pipeline that will
                        extend from the market in Fagatogo Village to Malaloa Village.
                        The pipeline is scheduled for construction in mid 1980.

                        Item No. 12. Aua to Auto: This project is an 8-inch diameter
                        pipeline that will extend the A.S.G. water system from Aua Village
                        east to the village of Auto.   The pipeline is scheduled for con-
                        struction in early 1981.

                        Item No. 13. Mapusaga (A.S.C.C.): This project consists of a
                        booster station that will be connected to the Tafuna and Mapusaga
                        pipeline (Item 1). The pump station will provide the capability
                        of lifting water from the lower service level to the second service
                        level villages of Mapusaga and Faleniu. The station is currently
                        under construction and is scheduled for completion in 1978.

                        Item No. 14. Pavaiai Booster Pump: This booster pump will be
                        used to lift water from the existing Mapusaga service level to
                        the next highest service level. Villages within the higher water
                        service level include Pavaiai and Futiga. When the transmission
                        pipelines are complete, this booster will allow ground water from

                        the Tafuna Plains to be distributed to the eastern end of the

                        island. The station will also provide a backup supply for the
                        existing Iliili ground water sources. Construction plans for this

                        system are complete and construction is scheduled to start in the

                        near future.

                                                   111-22
<pb n="60" />

                       Item No. 15. Mapusagafou Booster Pump: This booster pump will

                       be used to lift water from the third water service level to the

                       fourth to serve Mapusagafou Village. The station will provide
                       a backup supply of ground water to Mapusagafou which is currently
                       served from the undependable Puna Stream intake.

                       Item No. 16. Five Places: These five booster stations will be

                       installed near:

                       A. Lupelele School in Iliili Village to lift water from the lower
                       service level to the second service level to provide water to the
                       village of Iliili.
                       B. Puapua Village to lift water from the second service level
                       to the third service level. The pump station will allow water
                       from the Leone system to be moved easterly to Futiga.
                       C. Tafananai Village to move water from the Bay Area easterly
                       to the villages along the south coast.
                       D. Mapuaagafou (two stations) to lift water from the fourth ser-
                       vice level to a fifth and sixth so that water can be provided to

                       Aoloaufou Village.

                       Construction of these booster stations will span throughout the
                       period of the proposed improvement program. The first station
                       is scheduled for construction in early 1979.

                       Item No. 17. Pavaiai Reservoir: This proposed 0.75 million gallon
                       storage reservoir will be located with a base elevation of 320

                       feet. The reservoir will serve the second service elevation vil-

                       lages of Faleniu and Mapusaga. The reservoir will be fed primarily
                       by the Mapusaga (A.S.C.C.) booster station (Item 13). Construction
                       began on the tank base in April, 1978.

                                                   111-23
<pb n="61" />

                        Item No. 18. Mapusagafou Reservoir: This proposed 0.5 million
                        gallon reservoir will be located with a base elevation of 635 feet.
                        The reservoir serves the fourth service level village of Mapusagafou.
                        The reservoir will be fed by the Mapusagafou booster pump (Item
                        15). Construction is scheduled to start on this reservoir during
                        1978.

                        Item No. 19. Aua Reservoir: This proposed 1.0 million gallon

                        reservoir will be located with a base elevation of 175 feet. The

                        reservoir will serve the area from the canneries to Aua Village.
                        Construction is scheduled to start on this reservoir in late 1978.

                        Item No. 20. Leone Reservoir: The storage reservoir proposed
                        for the Leone area is 3.0 million gallons in capacity. The reser-
                        voir will provide water to the proposed western loop water system.
                        The reservoir will be supplied by wells near Malaeloa. Design
                        of the project is scheduled to begin in July of 1978, with con-
                        struction to be completed before March, 1980.

                        Item No. 21. Futiga Reservoir: The proposed 0.75 million gallon
                        reservoir at Futiga will be set at base elevation of approximately
                        450 feet to serve the third service level. The villages in the
                        third service level are Futiga and Pavaiai.   The reservoir can
                        be fed from the Puapua, 1liili or Pavaiai booster stations. Con-
                        struction of this reservoir is scheduled to be begin in March of

                        1979.

                        Item No. 22. Asili Reservoir: The proposed 1.0 million gallon
                        storage reservoir will serve the villages on the western end of

                        the island from Leone to Amanave. Construction is scheduled for

                        completion in 1980.

                                                   111-24
<pb n="62" />

                      Item No. 23 Exploratory and Test Wells: This drilling pro    gram
                      is to be accomplished by the A.S.G. operating the drilling rig
                      obtained from the U.S. Army Corps of Engineers. The project was
                      delayed for some time pending the recruitment of a qualified drill
                      rig operator. The A.S.G. has solved this problem and the program
                      is under way. Preliminary plans call for drilling in Malaeimi
                      Valley, the Manula Islands and in the outer villages.of Tutuila
                      Island.

                      Item No. 24. Fy 76 HUD Program: This is an ongoing production
                      well drilling program. Drilling under the first contract has been
                      completed and the second Contract for four  additional wells was
                      awarded in May of 1978. The third contract will be advertised
                      upon completion of the second contract. The new wells under the
                      second contract are scheduled to be drilled in the Tafuna well
                      field somewhere between-existing wells 60 and 52, one quarter of
                      the way up the well field access road between wells 46 and 72 and
                      at the Iliili Village church site and at Malaeloa.Village.

                      Item No. 25. F Y 77 DOI Program: This contract is for the procure-
                      ment and installation of pumps for completed wells.

                      Item No. 26. FY 77 HUD Program: This program is for the drilling
                      of additional production wells. Locations have not been determined.

                      Item.No. 27. FY 78 Pumps: This program calls for the procurement
                      and installation of pumps in existing drilled wells. Also included
                      is a program to inventory and rehabilitate existing wells for more
                      efficient operation of the existing.facilities.

                      Item*No. 28. FY 79: This is a proposed future drilling program
                      for production wells. Locations have not been determined.

                                                        111-25
<pb n="63" />

          Item No. 29 Spare Pumps: This provides for procurement of spare
          pumping equipment for backup of existing equipment.

          Item No. 30. Existing Reservoirs: This project consists of com-
          plete rehabilitation of the existing steel reservoirs at Pago Pago,
          Utulei, Blunts Point and Nuuuli. Work to be included is complete
          tank painting and repairs to the automatic level control valves.
          Construction is scheduled to start in late 1978.

          Item No. 31. Existing Filters: This rehabilitation program calls
          for painting, recharging and repairs to the existing filters at
          Vaipito, Fagatogo, Fagaalu and Vaitele. Work is currently in
          process at the Fagatogo filters.

          Item No. 32. Fagatogo Village: This project calls for improvements
          to the distribution and fire protection system in Fagatogo Village.
          The existing system consists of a multitude of small diameter pipe-
          lines that run throughout the village.

          Item No. 33. Utulei Village: This project consists of design
          and construction ofa pipeline loop through the upper part of
          Utulei Village. The new loop will provide improved water distri-
          bution and fire protection. Preliminary designs have been prepared
          for this project. Construction is scheduled to start in 1979.

          Item No. 34. Pago Pago Village: Improvements are planned to the
          fire protection and water distribution of Pago Pago under this
          project. Preliminary routing has been determined and construction
          is scheduled for 1979.

                                          111-26
<pb n="64" />

                                  CHAPTER IY
               RECOMMENDED DESIGN CRITERIA
<pb n="65" />

                                                  CHAPTER IV

                                          RECOMMENDED DESIGN CRITERIA

                   POPULATION PROJECTIONS

                   General

                   Master plans for capital improvements with relatively long life require
                   long-term population projections so that maximum benefits can be obtained
                   from the improvements. The preparation of a long-term population pro-
                   jection for American Samoa i-s a very difficult and somewhat risky task.
                   Population changes are closely tied to the economic conditions in Samoa
                   and the United States and to the paternalistic inclinations of the U.S.
                   Congress. During times of economic slowdown and/or reduced federal
                   appropriations, history has shown that emigration from Samoa to the
                   U.S. mainland and Hawaii has increased dramatically (American Samoans
                   are American Nationals and are free to enter the U.S. at any time).
                   During times of economic growth, emigration decreases and migrations
                   to Samoa from other Pacific nations (most notably Western Samoa) increases.

                   Historical Background

                   The first record of the population of American Samoa was made by the
                   U.S. Navy in 1900. Since then, the population has grown from 5679
                   to 30,600 in 1977. This represents an annual growth rate of 2.7% and
                   a five-fold increase (Table IV-1).

                   From 1900 until the 1940's, the population grew at an annual rate of
                   approximately 2%. Improved health conditions, better hygienic and
                   sanitary habits, and the establishment of a hospital by the Navy con-
                   tributed to this growth rate.

                                                   IV-1
<pb n="66" />

                                                            ASSESSMENT OF WATER SYSTEMS

                                                                   AMERICAN SAMOA

                                                                     TABLE IV- I
                                 POPULATION OF AMERICAN SAMOA FROM 1900 to 1974 BY DISTRICT

                                                           Eastern         Western                      Swain's      Index      OA
                 Census Date                Total          Tutuila          Tutuila       MGnu'G         Island   (I 900= 100)  F

                 June 1,    1900             5679            2221            1702          1756                        100
                            1901             5563            2342            1618          1603                          98
                            1903             5888            2441            1752          1695                        104
                            1908             6780            3018            1907          1855                        119
                            1912             7251            3186            2268          1797                        128
                 Jan. 1,    1920             8058            3777            2408          1873                        142
                            1926             8763            4221            2396          2060            87 1        154
                 Apr.   1,  1930            10055            5032            2777          2147            99          177
                 Apr.   1,  1940            12908            6733            3431          2597           147          227
                            1945            16493            9338            4610          2406           139          290
                 Apr.   1,  1950            18937           10624            5330          2819           164          333
                 Sept.25,   1956            20154           11405            5902          2767            80          355
                 Apr.   1,  1960            20051           11137            6113          2095           106          353
                 Apr.   1,  1970            27159           15955            9018          2112            74          478
                 Sept.26,   1974            29190           16828            10520         1808            34          514
                 Jan. 31,   1977            30600                                                                      538
                 1  SWGin's Island become an American       possession in    1923.
                 Source: U.S. Navy, A.S.G and Federal censuses.
<pb n="67" />

                   The 4.9% annual increase in population between 1940 and 1945 is attri-
                   buted to a natural increase and to immigrants from Western Samoa who
                   came to American Samoa because of a great demand for labor during World

                   War II.

                   After the Navy left American Samoa in 1950, population growth was less
                   than 1% and there was even a slight decrease in the period 1956 to 1960.
                   This slowing of growth is most likely the result of mass emigration
                   due to the economic slowdown after the war and neglect by the U.S.

                   government.

                   The increased interest of the U.S. government in American Samoa begin-
                   ning in the 1960's sparked a dramatic 3% annual growth in population
                   between 1960 and 1970.

                   The census of 1974 indicated that the growth rate had slowed consider-
                   ably between 1970 and 1974 to a rate of 1.53% per year. This is almost
                   certainly due to increased emigration as the 1974 census coincided with
                   an economic crisis and reductions in local A.S.G. employment in Samoa.
                   The A.S.G. employs 10% of the population which, given the median age
                   of 15, means that the A.S.G. employs the majority of the adult work
                   force; thus, any reduction in A.S.G. employment has a severe economic

                   effect.

                   A special sample census performed by the A.S.G. in January of 1977
                   indicates that the annual growth rate has increased to a current rate
                   of approximately 2.1% between 1974 and 1977. The average annual rate
                   between 1970 and 1977 was approximately 1.7%.

                   The American Samoa General Plan Interim Report and Preliminary General
                   Plan, Phase II (Eckbo, Dean, Austin &amp; Williams, 1972 and 1973) presented
                   four alternate population projections at five year intervals through
                   1990 (Table IV-2). These projections were based upon studies and pro-
                   jections of fertility rates, employment and migration in American Samoa.

                                                   IV-3
<pb n="68" />

                                                    ASSESSMENT OF WATER SYSTEMS

                                                            AMERICAN SAMOA

                                                             TABLE IV-2

                                               AMERICAN SAMOA GENERAL PLAN

                                                   POPULATION PROJECTIONS

                                               Actual                                                        1970-
                        Alternative              1970        1975        1980        1985         1990       1990

                                                                Numbers
                        Projection 1           27,160       31,500      34,600      39,400      43,400
                        Projection 11   2      27,160       30,500      34,000      37,000      40,500
                        Projection  1113       27,160       30,720      34,120      37,280      40,410
                        Projection  IV 4       27,160       30,200      33,500      35,500      37,500

                                                      Annual Percent Increase
                        Projection  1                           3.0         1.9         2.6         2.0      2.37
                        Projection  11                          2.4         2.2         1.7         1.8      2.02
                        Projection  [it                         2.5         2.1         1.8         1.6      2.01
                        Projection  IV                          2.1         2.1         1.2         1.1      1.62

                        1.   Projection 1:     Assumes trend fertility rates &amp; planned employment.
                        2.   Projection If:    Assumes trend fertility rates &amp; trend employment.
                        3.   Projection III:   Assumes planned fertility rates &amp; planned employment.
                        4.   Projection IV:    Assumes planned fertility rates &amp; trend employment.
                        5.   Trend fertility rate - the present (1970) slightly decreasing rate
                             projected based on no change in present (1973) government family
                             planning program.
                        6.   Planned fertility rate - the gradually decreasing rate projected
                             in the Interim General Plan Report.

                        Source: American Samoa General Plan - Interim Report, 1972.

                                                                IV-4
<pb n="69" />

                   The high Projection I assumes current trend fertility rates and planned
                   employment opportunities resulting in a 2.37% overall annual rate of
                   population increase. Projection II assumes -trend fertility rates and
                   trend employment resulting in a 2.02% overall annual rate of population
                   increase. Projection III assumes planned fertility rates and planned
                   employment for a 2.01% overall annual rate of population increase.
                   The low Projection IV assumes planned fertility rates and trend employ-
                   ment for a 1.6% overall annual rate of population increase.

                   Population Projection

                   For the purposes of water systems planning, the A.S.G. Development Planning
                   Office has recommended a straight line projection of a 2% annual growth
                   rate for the overall territory population.

                   For purposes of evaluating the proposed A.S.G. central water system,
                   the study area of this report will be the entire south shore of Tutuila
                   Island from Tula Village on the east to Amanave Village on the west.

                   The individual areas or zones will be as follows:

                        Pago Pago Bay Area

                        Tafuna Plains Area

                        Tutuila Island West of Futiga Village
                        Tutuila Island East of Aua Village

                   Factors which were considered in defining these zones include natural
                   land systems (such as watershed divisions, topographic and elevational
                   changes) and exposure or orientation identity. Also considered were
                   man-made boundaries such as structures, linkages, and service systems.
                   Consideration of the relative proximity to urbanizing areas or areas

                                                   IV-5
<pb n="70" />

                    that have potential for urbanization was also one of the defining fac-
                    tors. The annual growth rates applied to each area have also been
                    recommended by the A.S.G. Development Planning Office.

                    The Bay Area (Pago Pago) is anticipated to have a growth rate of 1.9%.
                    The Bay Area represents the most significant social, political and
                    economic gathering place in the territory; it is also the most congested
                    and crowded. Suitable land for residential construction is becoming
                    more and more scarce and will tend to restrict growth in the area.

                    The Tafuna Plains area has a total of over 3400 acres of land with
                    a slope of under 30% and represents the largest area with potential
                    for growth. This potential for growth has already begun to be realized
                    as the population center of the island has gradually shifted westward
                    out of the Bay Area since 1960. The percentage of total population
                    has steadily increased in the Western district at the expense of the

                    Eastern and Manua districts.

                    Growth in the Tafuna Plain area-is assumed to follow the established
                    trend for the Western district since 1960 and grow at an annual rate
                    of 3.8%.

                    Tutuila Island west of Futiga Village is expected to increase in popu-
                    lation at a rate nearly equal to that of the overall territory. The
                    proximity of this area to the Tafuna Plain will promote expansion and
                    an annual rate of 2.4% was used.

                    Tutuila Island east of Aua Village is expected to grow at a rate of
                    only 0.75%. The lower rate for this area is in accordance with recent
                    trends. The area has limited land area with slopes suitable for build-
                    ing construction and is the most remote from the business and commercial

                    centers.

                                                    IV-6
<pb n="71" />

                                                                                          ASSESSMENT OF WATER SYSTEMS

                                                                                                       AwrcAN SAMOA

                                                                                                       TABLEW-3
                                                                                  STUDY AREA POPULATION BY VILLAGE

                                                                                          Population                                                             Population
                                                                                       1974            2000                                                      1974            2000
                                     Tutuila Island M of F            I a                                           Tcfuna Plains Area
                                             - Cr-owth      at.                                                                             te 3.8%)
                                     TAnnual                       44                                               (Annual Growth To
                                            Amanove                                    292             541                 Futigo                                273             720
                                            Failolo                                    80              148                 Pavoici                               853             2249
                                            Agucjulu                                   55              102                 Mosepa                                340             897
                                            Uturnea                                    46              85                                                        -               -
                                            Seefogo                                    211             391                            Subtotal                   1466            3866
                                            Nua                                        155             287                 lHili                                 615             1622
                                            Afoo                                       101             187                 Foleniu                               566             1493
                                            Asili                                      184             341                 Maloeimi                              340             897
                                            Amoluia                                    188             348                            Subtotal                   1521            4012
                                                                                                       -                   Mapusagafou                           533             1406
                                                    Subtotal                           1312            2430
                                            Voilootai                                  742             1375                           Subtotal                   533             1406
                                            Tapurtimu                                  396             733                 Aoloourfou                            276             728
                                            malaeloc                                   295             546                 Aosufou,                              134             353
                                            Leone                                      1823            3377                                                                      -
                                                                                       -               -                              Subtotal                   410             1081
                                                    Subtotal                           3256            6031                Valtogi                               613             1617
                                                                                                                           Tofunc                                820             2162
                                                                                                                           Nuuuli                                2096            5527

                                                                                                                                      Subtotal                   3529            9306

                                                                                                                                      TOTAL                                  25,702
                                               a'   Harbor Area                                                     Tutuila Island East     of
                                     R'nanupr @rowth Kate I.?%)                                                     Auc Villa
                                                                                                                    (Annual Frowth Rate 0.75%)
                                            Foganeanec                                 172             281                 Tafaminai                             36              44
                                            matuv                                      238             388                 Lculiifou                             170             206
                                            Faturnafuti                                72              117                 Lauliituai                            328             398

                                                                                       -               -                   Aumi                                  123             149
                                                    Subtotal                           482             786                 Alega                                 23              28
                                            Fcgoalu                                    940             1533                Avcio                                 51              62
                                            Utulei                                     937             1529                                                                      -
                                            Fagatogo                                   1788            2917                           Subtotal                   731             887
                                                                                       -               -                   Auto                                  196             238
                                                    Subtotal                           3665            5979                Utu-100                               33              40
                                            Pooo    Pago                               2529            4126                Annauc                                79              96
                                            Anuo                                       41              67                  Fagaitua                              457             555
                                            Atuu                                       582             949                 Alofau                                409             496
                                            Lelooloa                                   429             700                                                                       -
                                            Auo                                        1200            1958                           Subtotal                   1174            1425
                                                                                       -               -                   Amouli                                324             393
                                                    Subtotal                           4781            7800                Auasi                                 77              94
                                                    TOTAL                                          14,565                  Uturnea                               43              52
                                                                                                                           Aloo                                  345             4:9
                                                                                                                                                                 345             4 9
                                                                                                                           Tula

                                                                                                                                      Subtotal                   1134            1377

                                                                                                                                      TOTAL                                      3689

                                                                                                                                      GRAND TOTAL            23,994          46,085

                                                                                                             IV-7
<pb n="72" />

                   SYSTEM DEMAND DESIGN CRITERIA

                   General

                   The determination of demands is one of the first major tasks in analyzing
                   a water system. This data is used as the determining factor in evalua-
                   ting the adequacies or shortcomings of the water supply and distribution
                   system and to estimate the size of the facilities that will be required
                   in the future. There is a very serious lack of data collected on the
                   existing system in American Samoa that can give accurate information
                   on the system's operating characteristics. Only 25% of the consumers
                   and sources are metered and there is no data on pressure or flow rates
                   within key points of the system. Some data has been collected during
                   the past year, but the limited amount requires that consumption and

                   variations in demand and flow rates be estimated.    It should also be

                   understood that this engineering evaluation assumes that the A.S.G.
                   water system will be extended along the entire southshore of Tutuila
                   Island as proposed by the A.S.G.

                   Per Capita Water Consumption

                   Data obtained over a four month period between October 1977 and January
                   1978 indicates that the estimated overall residential consumption of
                   water varies from 264 to 319 gallons per capita per day (Table IV-4),
                   while consumption on metered residential connections was estimated at
                   56 gallons per capita per day. The disparity between these two figures
                   may be due to the limited accuracy of the data collected, but it is
                   also an indication of waste and misuse of water within the system.

                   We estimate that the long term average day residential demand will be
                   about 150 gallons per capita per day. Considerations used in arriving
                   at this figure are as follows:

                                                    IV-8
<pb n="73" />

                                                       ASSESSMENT OF WATER SYSTEMS

                                                                 AMERICAN SAMOA

                                                                  TABLE IV-4

                                               EVALUATION OF WATER CONSUMPTION

                                                                                                C14
                                                             C
                                            E     -
                                                             .2

                                          4-
                                          a ;&gt;            w-E                        C0 in      C
                              -C                          U. D
                                          E               0
                                C
                                          .;: 4;;-           C U          ::E    4-   E -5                  E
                                0         V) 04-             0 ::E               0    0         4)       -0 o
                                          Uj @- 0         :E U -          -,o   @- of U .6      = 0      S U 0

                            Oct.  177       4.35          1.06         24.4          325        278         47         59

                            Nov.  177       5.14          1.30         24.1          385        319         66         58
                            Dec.  177       4.25          1.32         31.1          318        264         54         45
                            Jan.  178       4.37          1.11         25.3          237        279         48         63

                            Avg.            4.50          1.20         26.2          316        285         54         56

                            1 Data from     11G.A.S. System      Water Usage" reports prepared by
                              Department of Public Works Water, Sewer, Solid Waste Division.
                              (See Appendix A)

                              Based upon A.S.G. estimate of 13,350 people served by
                              the water system.
                            3 Based upon 7.4 persons per account, one residence per account.

                                                                     IV-9
<pb n="74" />

                         1.   Although the existing domestic consumption of metered resi-
                              dences is estimated at 56 gallons per capita per day, domestic
                              consumption will increase as standards of living increase.

                         2.   Metered residences may also be served by village water systems
                              which would contribute to an artificially low metered resi-
                              dential consumption because of a preferential use of the free
                              village system water.

                         3.   The present overall domestic commerical and industrial consump-
                              tion of 237 to 385 gallons per capita per day will be reduced
                              as meters are installed throughout the system.

                         4.   As it exists, the water distribution system has many built

                              in characteristics that contribute to water waste and misuse.

                              Many of these characteristics will never be entirely elimi-
                              nated, and overall consumption is likely to remain at a rela-
                              tively high rate.   With an effective conservation program,
                              residential water consumption could easily be reduced to 120
                              gallons per capita per day. We have added a 25% loss rate
                              to obtain our recommended rate of 150 gallons per capita per
                              day.

                         5.   Because of prevailing local attitudes towards paying for
                              water, the rates charged for water are likely to remain low
                              contributing to higher consumption rates.

                         6.   The data base from which the existing consumption rates have
                              been calculated is for a very limited period and contains
                              estimates of water production and population served. Consump-
                              tion estimates should, thereforej be conservative until addi-

                              tional data is available.

                                                     IV-10
<pb n="75" />

                     Service Levels

                     Distribution and storage systems must be separated into service levels
                     to maintain adequate pressures at high elevations and to prevent exces-
                     sive pressures at low elevations.

                     The maximum static pressure should not exceed approximately 100 psi.
                     Pressures above 100 psi can cause plumbing problems and contribute to
                     leaks and excessive water usage. Setting the maximum pressure at 100
                     psi fixes the lower elevation boundary of the service level at a specific
                     vertical distance below the storage reservoir overflow. Since 100 psi
                     is the pressure exerted at the base of a column of water 231 feet high,
                     the lowest consumer in the service level should not be more than 231
                     feet below the overflow of the storage reservoir.

                     The minimum static pressure at a customer connection should not be less
                     than 25 psi. Pressures below 25 psi will not allow modern water using
                     appliances and eq uipment to function properly. Setting the minimum
                     pressure at 25 psi fixes the upper elevation boundary of the service
                     level at a specific vertical distance below the storage reservoir over-
                     flow. To maintain a static pressure of 25 psi (equivalent to a column
                     of water 58 feet high) the upper service level boundary should be at
                     least 58 feet below the storage reservoir overflow. In addition,
                     approximately 42 feet is necessary to satisfy the distribution system
                     hydraulic requirements, giving a total minimum height of 100 feet.

                     The distribution system hydraulic requirements are made up of the daily
                     fluctuation in the reservoir water level (10 to 15 feet) during the
                     peak demand period and an additional 27 to 32 feet of pressure head
                     required to force water through the distribution pipelines to the con-

                     sumer's service.

                                                      IV-11
<pb n="76" />

              Based on the above general considerations, the A.S.G. water system will
              require seven service levels (Table IV-5). These seven service levels
              can supply water from sea level to Aoloaufou Village at elevation 1375
              feet above sea level. Figure VI-12 shows service level areas of the
              study area.

              In the Bay Area, Utulei, Fagatogo and Pago Pago Village are becoming
              so densely developed that residences are now being constructed on the
              hillsides above the villages and above the effective service elevation
              of service level one. A second service level must be developed in these
              villages if the homes are to receive water.

              Variations in Flow Rates

              There are no records of the variations in hourly, daily or monthly water
              flow rates or pressures for the A.S.G. water system. Records from many
              water systems in the United States indicate that the maximum daily flow
              varies from approximately 1.2 to 2.5 times the average daily flow.
              For Samoa, we recommend a factor of 1.5. Lawns and gardens rarely
              require irrigation during the dry season in Samoa, and a low peak day

              factor results.

              The supply facilities should be able to provide at least the average
              demand on the day of the maximum system demand. Hourly peak demands
              in excess of the average are most economically supplied from distri-
              bution system storage reservoirs.

              Peak hourly flow rates are generally 2.5 to 3.5 times the average flow
              rates depending upon the service area involved. For Samoa, we recommend
              an average factor of 3.0 be used. Minimum daily flow rates will, in
              general, vary from 25 to 50 percent of the average daily flow rates.
              The estimated peak day flow rates for the study area for the estimated
              year 2000 populations are shown in Table IV-6.

                                              IV-12
<pb n="77" />

                       Item No. 35. Nuuuli Village: This project will provide for re-
                       placement of the existing old 6-inch pipeline that feeds the air-
                       port from Vaitele Stream. The pipeline dates back to WWII and
                       is subject to frequent breaks.

                       Item No. 36. Water Purification: This program will provide chlori-
                       nation equipment for many of the new wells that currently are not

                       chlorinated.

                       Item No. 37. Chlorinator Conversion: Based upon the report "Disin-
                       fection of Ground water Supplies, American Samoa" (CH2M-Hill, 1977),
                       the government intends to upgrade its chlorination equipment.
                       This program will provide for design, procurement and installation
                       of the new equipment at eight different sites.

                       Item No. 38. Rechlorination: This project will consist of design
                       and construction of a rechlorination station near Fagaalu so that
                       chlorine residual can be maintained in the water pumped from Tafuna

                       to the Bay Area.

                       Items Nos. 39 and 40. Treatment Facilities: These projects are
                       for improved treatment facilities for surface water sources at
                       Vaipito, Fagatogo, Fagaalu and Vaitele streams.

                       Item No. 41. Leak Detection: This program is for the procurement
                       of equipment, training of personnel and institution of a leak detec-
                       tion program for the existing water system. The training of personnel
                       under this program began in April of 1978.

                       Item No. 42. Malaeimi Pipeline: This project is for the construc-
                       tion of a pipeline back into the Malaeimi Valley for transmission

                                                   111-27
<pb n="78" />

                        of water from proposed wells in the valley to the'water system.
                        The project is contingent upon acquisition of well site right-of-
                        ways and successful well drilling and testing.

                        Item No. 43. Operation and Maintenance Manuals: This project
                        calls for a program to develop operation and maintenance manuals
                        for the A.S.G. water system. The program will include system
                        operation procedures, maintenance requirements and mapping of the
                        water system that will accurately show the size and location of
                        all pipelines and valves, interconnection details and other water
                        system appurtenances on the transmission and distribution system.

                        Item No. 44. Meter Programs: This program is for obtaining more
                        complete operating data on the water system. Meters will be in-
                        stalled on all water supply sources and at key points within the
                        distribution and transmission system.

                        Items Nos. 45, 46, and 47. Miscellaneous Improvements FY 77, 78,
                        and 79: This is a program for contingency improvements for pipe-
                        line failures, connections, well repairs and construction.

                                                   111-28
<pb n="79" />

                                              ASSESSMENT OF WATER SYSTEMS

                                                     AMERICAN SAMOA

                                                       TABLE IV-5
                                          RECOMMENDED SERVICE LEVELS

                                                                                   Normal
                                           Reservoir              Service          Operating
                                           Elevation              Level            Pressure
                             Service               Over         Boundary,           Range
                          Level No.     Base       Flow        Elevations            (PSI)

                                        190,       2221          0 - 1251          24 - 96

                                2       320        352         125  - 250          26 -  98

                                3       450        482         250  - 375          28 -  100
                                4       580        612         375  - 520          22 -  103

                                5       725        757         520  - 665          22 -  103

                                6       870        902         665  - 810          22 -  103

                                7       1435       1467        1225 - 1375         22 -  105

                             1  Elevations in feet above mean sea     level.

                                                            IV-13
<pb n="80" />

                                                    ASSESSMENT OF WATER SYSTEMS

                                                           AMERICAN SAMOA

                                                            TABLE IV-6

                                             YEAR 2000 PEAK DAY FLOW RATES

                                                                           Industrial               1             2
                                                             Yr. 2000 Allowance Residential                Total
                   No.       Service Area                   Population      (MGD)          (MGD)            NGD)

                             Amanave to Amaluio                  2430           -           0.547           0.547
                      2      Leone, Taputimu,
                             Vailoatai                           5031         0.05          1.132           1.182
                      3      Malaeloa, Pua Pua                   1000           -           0.225           0.225
                      4      Futiga, Pavaiai, Mesepa             3866           -           0.870           0.870
                      5      Mapusagafou (lower)                  706           -           0.159           0.159
                      6      Mapusagafou (middle)                 350           -           0.079           0.079
                      7      Mapusagafou (upper)                  350           -           0.079           0.079
                      8      Aoloaufou, Aasufou                  1081           -           0.243           0.243
                      9      Iiiiii                              1622            -          0.365           0.365
                      10     Faleniu, Mopusaga,
                             Malaeimi                            2390         0.07          0.538           0.608
                      11     Vaitogi                             1617           -           0.364           0.364
                      12     Tafuna, Nuuuli                      7689         0.25          1.730           1.980
                      13     Faganeanea, Fatumafuti               786           -           0.177           0.177
                      14     Fagaalu, Utulei,
                             Fagatogo                            5979         0.20          1.345           1.545
                      15     Pago Pago to Aua                    7800         0.90          1.755           2.655
                      16     Tafananai to Avaio                   887           -           0.200           0.200
                      17     Auto, Fagaitua,
                             Alofou                              1425         0.05          0.321           0.371
                      18     Amouli, Tula                        1377           -           0.310           0.310

                                                               46,086         1.52          10.439          11.959
                      1150 gal Ions/capita/day x 1.5 peak day flow rate
                      2Peak day rate = population x 150 gallons/capita/day x 1.5 peak
                             day flow factor + industrial allowance

                                                                 IV-14
<pb n="81" />

                  Fire Protection

                  Water usage for fire protection varies with the use of the property
                  to be protected. Although the total quantity of water used is small,
                  the rates of use are quite large. The water distribution system must
                  have sufficient capacity to supply water for fighting fires in addition
                  to maintaining adequate flows to residential, commercial and industrial

                  customers. The National Board of Fire Underwriters established minimum

                  standards for the quantity and duration of flow for fire fighting pur-
                  poses. The standards were developed to measure a water system's ability
                  to fight fires and are used in determining the rates for an area's fire
                  insurance premiums. The standards have also evolved into fire protection
                  guidelines for design of water systems.

                  The fire flows required in higher value business districts are generally
                  based on the total population of the area served by the business district.
                  Fire flows in residential areas are based on the size, structural condi-
                  tion, value, and density of the dwelling units. Fire flows for institu-
                  tions, industrial buildings, and suburban commercial complexes are
                  usually evaluated separately. The recommended fire flows for American

                  Samoa are shown in Table IV-7.

                  The existing fire protection system consists of fire hydrants throughout

                  the distribution system and fire stations with pumper capacity at Leone
                  and Fagatogo. The design of the recommended system assumes that the
                  fire fighting capabilities will be continued to be upgraded and will
                  be able to provide pumper truck fire fighting capabilities to all areas
                  served by the A.S.G. water system.

                                                   IV-15
<pb n="82" />

                                              ASSESSMENT OF WATER SYSTEMS

                                                    AMERICAN SAMOA

                                                       TABLE IV-7

                               MINIMUM RECOMMENDED FIRE FLOW REQUIREMENTS

                                                                        Recommended Fire Flow
                                                              Quantity,       Duration,          Volume
                   Location                                      gpm             hours             mq
                   Principal Business District
                         Population Served
                               1000 or less                      1000               2              0.12

                               2000                              1500               2              0.18
                               5000                              2250               2              0.27
                             10,000                              3000               3              0.54
                   Future Industrial Tracts                      3000               3              0.54
                   Typical Elementary School                     1500               2              0.18
                   Typical High School,
                       College or Church                         3000               3              0.54
                   Single-Family Dwelling Area                   1000               2              0.12
                   Multiple-Family Dwelling Area                 2000               2              0.24

                                                          iv-16
<pb n="83" />

                      Pipeline Size

                      Transmission and distribution pipelines should be sized to provide the
                      maximum daily flow plus fire flows with a residual pressure of 25 psi
                      at the critical fire hydrant. In determining the carrying capacity
                      of mains, the following 11C11 valves will be used:

                                                                            HAZEN AND WILLIAMS
                                       PIPE SIZE                           COEFFICIENT OF FLOW "C"
                                       411, 61,                                        100
                                       811 7 1211                                      110
                                      16", 2011                                        120
                                      2411 and larger                                  130

                      The maximum velocity of flow      in mains should be 6 feet      per second,
                      without fire flows. With fire flows, the maximum velocity of flow
                      should be 10 feet per second.

                      Storage Reservoir

                      The system's storage reservoirs should provide adequate storage to meet
                      the following criteria:

                            1.    The maximum day consumption with no source input to the reser-
                                  voir. Reservoir is full at the beginning of the 24 hour
                                  period.
                            2.    The maximum day consumption plus fire flows for the fire
                                  duration shown in Table IV-7 (reservoir 3/4 full at the start
                                  of the fire) with credit for incoming flow from source or
                                  booster pumps, with one of the largest pumps out of service.

                      The recommended reservoir sizing based upon this criteria is shown in
                      Table IV-8. This table compares the requirement based upon -criterion

                                                            IV-17
<pb n="84" />

                                                              ASSESSMENT OF WATER SYSTEMS

                                                                       AMERICAN SAMOA

                                                                       TABLE IV-8

                                                                 RESERVOIR SIZING

                                                         &gt;,:@E
                                                                       &gt;        cu               E
                                                                                     4.2 @                 a @            3         4
                                                                       (U   X   4)               0         4- 0
                                                         &gt;z.s      4)        ,           Q)                         Use        Say
                                                         0 N           V3   a                    U     0
                                                                       LO                        C         0:*      (MG)       (MG)
                                                                  LL   .    :*                   - ;::                                      I
                                                         (1)        (2)     (3)       (4)        (5)       (6)        (7)        (8)
                             Location

                         Amanave Reservoi       r      0.547     0.27       0.817   1.089      -0.547@    0.542     0.547      0.75
                         Leone Reservoir(s)            1.182     0.54       1.722   2.296      -1.886     0.410     1.182      1.50
                         Futiga Reservoir              0.225     0.54       0.765   1.020      -1.886        -      0.225      0.25
                         Mapusagafou # 1               0.870     0.18       1.050   1.400      -0.56      0.840     0.840      1.0
                         Mapusagafou #2                0.159     0.12       0.279   0.372      -0.159     0.213     0.213      0.25
                         Mapusagafou #3                0.079     0.12       0.199   0.265      -0.079     0.186     0.186      0.25
                         Mopusagaf ou #4               0.079     0.12       0.199   0.265      -0.079     0.186     0.186      0.25
                         lliili Reservoir              0.365     0.18       0.545   0.727      -1.56         -      0.365      0.50
                         Vaitogi Reservoir             0.364     0.12       0.484   0.645      -0.364     0.281     0.364      0.5
                         Tafuna, Nuuuli                1.980     0.54       2.520   3.360      -7.238        -      1.980      2.0
                         Faleniu, Mapusaga,
                         Malaeimi                      0.608     0.54       1.148   1.531      -7.238        -      0.608      0.75
                         Faganeanea,
                         Fatumafuti                    0.177        -        -         -         -           -      N/A        N/A

                         Fagatogo                      1.545     0.54       2.085   2.780      -5-081        -      1.545      2.0
                         Fagaalu, Utulei,

                         Pago Pago, Aua                2.655     0.54       3.195   4.260      -5-081        -      2.655      3.0
                         Laulii to Alega               0.200     0.18       0.38    0.507      -0.881        -        0.20     0.25
                         Auto, Fagaitua,
                         Alofau                        0.371     0.54       0.911   1.215      -0.681     0.534     0.534      0.75
                         Amouli, Tula                  0.310     0.18       0.49    0.653      -0.31      0.343     0.343      0.50

                         1. From Table IV-6.

                         2. From Table IV-7.

                         3. Use maximum column I or 6.
                         4. Rounded up to nearest 0. 25 MG.

                                                                            IV-18
<pb n="85" />

                  one (column one) and criterion two (column six), selects the larger
                  of the two (column seven) and adjusts the requirements to fit the situa-
                  tion (column eight).

                  Pump Capacity

                  Booster pumping stations should be adequate to meet 1) the maximum
                  day demand with an operating time of 16 hours and 2) the maximum day
                  demand plus fire demands during the duration of a fire, less 3/4 of
                  reservoir storage. In all cases, the largest unit will be considered

                  out of service.

                                                   IV-19
<pb n="86" />

                                  CHAPTER V
                IDENTIFICATION OF PROBLEMS
<pb n="87" />

                                                   CHAPTER V

                                           IDENTIFICATION OF PROBLEMS

                   SURFACE WATER SUPPLIES

                   General

                   Prior to the 1970's, water supplies in American Samoa were almost exclu-
                   sively from surface water streams, and water supplies came directly
                   from the streams with little or no storage provided. These streams
                   were adequate for use by a relatively small population with a small
                   per capita demand for water and a low expectation for the quality of
                   service. During periods of low rainfall and restricted water supplies,
                   the population survived with some inconvenience and economic hardship
                   through water rationing.

                   Without storage, surface water reservoirs can only be relied upon to
                   supply water at their low flow rates. A surface source is only as good
                   as its dry season flow unless higher than normal flows can be stored
                   for use during low flow periods.

                   Available Storage

                   Unfortunately, the steep, narrow stream valleys of American Samoa do
                   not provide easily available sites for storage reservoirs of sufficient
                   capacity to supply water during the four to six month Samoan dry season.
                   A water system relying entirely on surface water would require several
                   hundred million gallons of water in storage to meet the design year
                   water demands through a dry season.   The largest existing reservoir
                   in American Samoa is at Virgin Falls on the Fagaalu Stream. This reser-
                   voir is approximately 25 feet high and holds approximately 4.5 million.

                                                  V-1
<pb n="88" />

                    gallons of water. A hydrologic study of surface water (Dames &amp; Moore
                    1978) showed that approximately 164 million gallons of storage would
                    be required for each million gallons per day of regulated flow.

                    Available Supplies

                    The American Samoa Government does not maintain any accurate long-term
                    flow records of its surface water sources, and all past water supply
                    planning studies were necessarily based upon estimates of low flows.
                    The record droughts of 1971 and 1974 indicated that all previous esti-
                    mates were overly optimistic (Table 111-2). During each of these years,
                    the total flow from five of the major stream sources for the A.S.G.
                    water system dropped to approximately 250 gallons per minute.

                    One major advantage of utilizing surface water in American Samoa is
                    that some of the sources are located closer to the point of consumption
                    in the Bay Area (Pago Pago) eliminating the need for long transmission
                    pipelines and booster pumping stations. This single advantage is more
                    than offset by the tendency of surface waters to vary greatly in quality
                    and quantity from day to day and by the complex treatment required to
                    meet current federal water quality standards. The relatively low flows
                    available from a single stream and the random spacing of each stream
                    throughout the water system require that the complex treatment equipment
                    be duplicated in many locations compounding the maintenance and opera-
                    tion problems.

                    Watershed Protection

                    Surface water supplies require strict protection of watersheds from
                    contamination. All human, residential, agricultural, and recreational
                    activities should be controlled within a designated watershed area that

                    is above a surface water intake.

                                                    V-2
<pb n="89" />

                   In American Samoa, agricultural and recreational activities such as
                   hiking and bathing often take place in the watersheds of the existing
                   surface water supplies. Competition for housing sites is forcing resi-
                   dential developments higher and higher up hillsides behind existing
                   villages, seriously threatening most watersheds. Although restrictions
                   are needed, the A.S.G. does not currently exercise any control over

                   use of the watershed lands above its surface water sources.

                   Water Quality

                   The R.M. Towill Corporation investigated the Bay Area surface water
                   treatment systems (R.M. Towill, 1973). Even with somewhat optimistic
                   estimates of the minimum flow rates available, they recommended that

                   the surface water sources be abandoned. This recommendation was based

                   upon the following conclusions:

                        1.   The existing treatment equipment is inadequate for the condi-
                             tions in which it is operated. To operate satisfactorily,
                             the existing equipment needs to be repaired and upgraded by
                             the addition of provisions for pretreatment, pre and post
                             chlorination and monitoring of the system operations.
                        2.   Economic considerations of expenditures to upgrade the system
                             are not justified considering the small quantity of end product

                             produced.
                        3.   The degree of watershed protection to provide a 100% safe
                             water supply does not appear culturally or politically acceptable
                             to the community.
                        4.   There is insufficient quantity of technically qualified opera-
                             tional personnel to maintain the relatively complicated treat-
                             ment processes required.
                        5.   Public health considerations indicate that a water supply
                             should be abandoned if it is potentially dangerous because
                             of possible human error, mechanical malfunction, or other
                             factors beyond the control of the system operators.

                                                  V-3
<pb n="90" />

                   Past experience with the filters support the above recommendations.
                   The filters have been repaired and recharged two or three times in the
                   past eight years, and within a.short period they were inoperable. The
                   limited number of technically qualified operational personnel did not
                   have the time required to keep the filters functioning.

                   In recent years, the Department of Public Works has increased its efforts
                   at inservice training and maintenance of the treatment facilities and
                   has reported an improved operating record. However, the basic inadequacy
                   and unreliability of the equipment to operate correctly under the varying
                   quality of water remains.

                   GROUND WATER SUPPLIES

                   General

                   The natural quality of fresh ground water in American Samoa is very
                   good. It can meet the maximum contaminant levels set forth in the
                   National Primary Drinking Water Regulations for the parameters measured
                   and is suitable for domestic consumption and current industrial uses
                   in American Samoa. Since the early 1970's, the A.S.G. has directed
                   its water source development toward ground water supplies, and the quan-
                   tity and quality of water service has steadily improved. The improvement
                   in service, however, has not been without certain problems due primarily
                   to the previous lack of technical expertise and other management and
                   training needs.

                   Existing Resources and Problems

                   The basal ground water lens that is viewed as the primary source of

                   water for Samoa is located in a limited area known as the Tafuna-Leone

                   Plain. While this area has great potential for residential and commercial

                                                   v-4
<pb n="91" />

                   development and is rapidly growing, the major water system demands are
                   currently within the Bay Area some six miles distant from the well
                   sources. Because of its length, the transmission line is vulnerable
                   to breaks and power outages which can cut water service. The well pumps
                   and booster pumping stations require expensive electrical power and
                   sophisticated technical maintenance capabilities. These shortcomings
                   have created past operational problems with the ground water sources.

                   Recent tests of new booster pumping facilities at Fagaalu and Pago Pago

                   have indicated that there are an insufficient number of wells on line

                   to support the transmission facilities. The imminent addition of pumps
                   to existing new wells should relieve this problem.

                   The ground water reservoir in American Samoa is replenished continu-
                   ously, but it is a finite resource that can be over-taxed if care is

                   not exercised on the rate of withdrawal. Inadequate monitoring and
                   management of the development of the resource has caused seawater in-
                   trusion at several wells. The effect of ground water withdrawal on
                   the entire basal lens has not been determined; thus, overdevelopment

                   of the lens is a constant threat.

                   Right-of-Way Problems

                   Right-of-way for construction of wells has been a continuing problem
                   in ground water development. Right-of-way has been an especially acute
                   problem for wells because they usually must be located outside of recog-
                   nized areas of A.S.G. concern such as roadways, and the property owners
                   can not see any direct benefit to themselves from the construction of
                   the wells. The sites determined to have a high potential for production
                   are relatively limited and it has become increasingly difficult to find
                   land where right-of-way can be obtained by negotiation. This problem
                   is examined in more detail in the right-of-way section of this chapter.

                                                   V-5
<pb n="92" />

                    Public Support

                    There is very little public support for the water system development
                    in general and the ground water program in particular. For the most
                    part, the lack of support is due to a lack of communication between
                    the Public Works Department and the general public. There should be
                    an immediate and sustained effort to inform the people of Samoa of the
                    objectives of the Ground Water Development Program. A public education
                    and public involvement program listing the advantages and disadvantages
                    of utilizing ground water and the current implementation problems should
                    help to obtain public support. If the legislature and the public are
                    kept informed, they could possibly lend their support to the program.

                    TREATMENT

                    General

                    Existing treatment of the water supplies is limited to chlorination
                    of some ground water sources and filtration and chlorination of the
                    surface water sources. Because of operational problems, the filters
                    are sometimes bypassed. The degree of control over water quality is
                    generally very poor.

                    The treatment of ground water is limited to the wells in the Tafunafou
                    well field and a few other isolated sources such as the shallow dug
                    well at Utulei which serves the hotel. Because of the problems in
                    obtaining right-of-way, many of the recent wells have been drilled at
                    scattered locations. Separate chlorination equipment may have to be

                    installed and maintained at each of these wells if the water is to be

                    chlorinated before all customer connections.

                                                   V-6
<pb n="93" />

                   Filtration

                   Pressure filters have been installed at the Vaitele, lower Fagaalu and
                   Fagatogo surface water sources. Attempts have been made on several
                   occasions to activate these filters, however, the water supplied to
                   these filters is of such a varying quality and becomes so poor at times
                   that the filters are difficult to operate correctly. The equipment
                   does not provide for proper backwashing to clean the filters and there
                   is insufficient operator time and technical capabilities to give them

                   adequate care.

                   The three automatic gravity filters at Vaipito Reservoir have similar
                   operating problems to the pressure filters and in the past were fre-
                   quently bypassed. For a more complete discussion of the surface water
                   treatment facilities see The Analysis of Vaipito and Fagaalu Treatment
                   Systems, R.M. Towill Corporation, 1973.

                   Chlorination

                   The chlorination equipment throughout the system is inadequate. Chlo-
                   rine is applied only at some of the sources of supply and chlorine
                   residuals are not maintained throughout the system. Contact times are
                   insufficient and the equipment has no provision for automatic switchover
                   to a standby supply when one supply bottle has been exhausted. Several
                   days often elapse before maintenance personnel can replace the exhausted
                   supply containers.

                   For a more detailed discussion of the existing treatment system see
                   Disinfection of Ground Water Supplies, CH2M-Hill, 1977.

                                                   V-7
<pb n="94" />

                    TRANSMISSION AND PUMPING

                    General

                    Vast improvements in transmission and pumping capabilities of the A.S.G.
                    water system have been accomplished in the past six years. The area
                    served by A.S.G. water systems has greatly expanded from the original
                    Tafuna and Bay Area population centers. The ability to move water into
                    and through these areas was one of the main objectives of the past water
                    system improvement programs.

                    Transmission Pipelines

                    However, because of the excessive water consumption identified in Chapter
                    IV, two shortcomings currently exist within the system. Adequate opera-
                    ting pressures within the Pago Pago Bay Area (Tables V-1 and V-2) cannot
                    be maintained in the 12-inch diameter pipelines that extend from Nuuuli
                    to Fagaalu and from Utulei to Malaloa. This inadequate flow capacity
                    and the insufficient supplies from the Tafunafou well field also prevent

                    the operation of the two new booster stations at Fagaalu and Pago Pago.
                    If water consumption could be reduced to a more reasonable level of
                    150 GPCD (see following discussion on the distribution system in this
                    chapter) and more of the existing wells were operational, these faci-
                    lities would be adequate to meet current demands (Table V-3 and V-4).

                    The other transmission pipelines in the A.S.G. system are normally
                    capable of supplying current water demands. Villages beyond the exist-
                    ing A.S.G. system have critical deficiencies. The expansion of the
                    A.S.G. system to these areas should be preceeded by studies to deter-
                    mine the desires and expectations of the villages involved and the
                    adequacy of existing source and transmission facilities to handle the

                                                   V-8
<pb n="95" />

                                                     ASSESSMENT OF WATER SYSTEMS

                                                            AMERICAN SAMOA

                                                              TABLE V- I

                                                     PEAK 1978 FLOW RATES

                                                   FOR A.S.G. WATER SYSTEM

                                                                                Resi-  2                    Cummu-
                                                              Industrial       dential         Total          lative
                                                 1978          Demand          Demand          Flow           Flow
                       Service Area           Population        (MGD)          (MGD)           (MGD)          (MGD)

                       Tafuna                        845         0.01           0.390          0.400          5.785

                       Nuuuli                       2160            -           0.998          0.998          5.385
                       Faganeanea                    496            -           0.229          0.229          4.387
                       Fagaalu                       968         0.01           0.447          0.457          4.158
                       Utulei                        965            -           0.445          0.445          3.701
                       Fogatogo                     1842                        0.851          0.851          3.256
                       Pago Pago                    2605            -           1.204          1.204          2.405
                       Canneries                    1084         0.70           0.501          1.201          1.201

                                                  10,965         0.72           5.065          5.785

                       1 1974 Population plus 3%.
                       2Estimated November, 1977 average daily flow rate (385 GPCD)
                            x 1.2 peak day factor x population.
                       3Assumes no surface water inflow.

                                                                 V-9
<pb n="96" />

                                                       ASSESSMENT OF WATER SYSTEMS

                                                                AMERICAN SAMOA

                                                                 TABLE V-2
                                                        HYDRAULIC GRADE LINE
                                                     FOR A.S.G. WATER SYSTEM
                                                          1978 PEAK DAY FLOW

                                                                                    Head
                                                                         Pipe       loss                   Head     Eleva-
                                                   Flow Rate             Size         ft      Length       loss       tion
                             Location           MGD           GPM        (in)     1000 ft      (ft)        (ft)       HGL

                        Well Field                                                                                    260

                                                5.785         4017        16        9.8        2000          20
                        Highway Road            5.785         4017        20        3.2        2500           8       240
                        Airport Road            5.785         4017        24        1.24       2500           3       232
                        Housing Road                                                                                  229
                                                5.385         3740        24        1.04       7500           8

                        Coconut Point                                                                                 221
                        Fagaalu Booster         4.387         3046        12        26.6      12,000       319  1   -98 to 245
                                                4.158         2887        20        1.7        7500           13

                        Utulei                                                                                        232
                                                3.701         2570        12        19.5       7000        137  1

                        MOI-31OG                                                                                        95

                                                3.256         2261        16        3.8        1500           4
                        Pago Booster                                                                                   89 to 2451
                                                2.405         1670        1,6       1.8        1000           2
                        Pago Pago                                                                                     243
                                                1.201           834       12        2.3        5500           13

                        Canneries                                                                                     230
                        1Critical   pressure drops    creating low pressures        within water system.
                         Assumes distribution reservoirs do not contribute to system during peak flow.

                                                                     V-10
<pb n="97" />

                                                   ASSESSMENT OF WATER SYSTEMS

                                                            AMERICAN SAMOA

                                                             TABLE V-3

                                                     PEAK 1983 FLOW RATES
                                                  FOR A.S.G. WATER SYSTEM

                                                 19831                         Resi - 2                    Cummu-
                                                 Est.         Industrial      dential         Total           lative
                                                 Pop.         Demand          Demand          Flow            Flow
                         Service Area            Served        (MGD)           (MGD)          (MGD)          (MGD)

                      Tafuna &amp; Vaitogi              2005         0.01          0.451          0.461           3.811
                      Nuuuli                        2932           -           0.660          0.660           3.350
                      FaganeaneG                     674           -           0.152          0.152           2.690
                      Fagaalu                       1114         0.01          0.251          0.261           2.538
                      Utulei                        1110           -           0.250          0.250           2.277
                      Fagatogo                      2118         0.01          0.477          0.487           2.027
                      Pago Pago                     2996           -           0.674          0.674           1.540
                      Atuu, Anua &amp;
                      Canneries                      738         0.70          0.166          0.866           0.866

                                                 13,697          0.73          3.081          3.811
                      1 Per A.S.G. Development Planning Office.
                      2 Population x 150 GPCD x 1.5 Peak Day Factor.
                      3
                        Assumes no surface water inflow.

                        Flow is conservative as not all residents of Bay Area are on system
                        (many homes are above 175 foot effective service elevation or are on
                        private water systems).

                                                                 V-11
<pb n="98" />

                                                       ASSESSMENT OF WATER SYSTEMS

                                                               AMERICAN SAMOA

                                                                  TABLE V-4

                                                        HYDRAULIC GRADE LINE

                                                      FOR A.S.G. WATER SYSTEM

                                                          1983 PEAK DAY FLOW

                                                                                   Head
                                                                         Pipe        loss                 Head      Eleva-
                                                   Flow Rate             Size        ft       Length       loss       tion
                              Location          MGD           GPM        (in)     1000 ft       (ft)       (ft)       HGL

                       Well Field                                                                                     260

                                                3.811         2646        16         4.2        1500       6.3
                       Highway Road                                                                                   254
                                                3.811         2646        20         1.4        2500       3.5
                       Airport Road             3.600         2500        24       0.46         2500       1.15       250
                       Housing Road                                                                                   249
                                                3.300         2292        24       0.43         7500       3.2
                       Coconut Point                                                                                  246
                                                2.690         1868        12         9.6        12,000     115
                       Fagualu Booster                                                                                131  to 245
                       Utulei                   2.538         1763        20       0.65         7500       4.8        240
                       Malaloa                  2.277         1581        12         8.3        7000         58       182
                                                2.027         1408        16         1.4        1500       2.1
                       Pago Booster                                                                                   180  to 24
                                                1.540         1069        16       0.91         1000       0.9
                       Pago Pago                0.866           601       12         1.2        5500       6.6        244
                       Canneries                                                                                      237

                       Assumes distribution reservoirs do not contribute to system during peak flow.

                                                                     V-12
<pb n="99" />

                   increased water demands. Controls should be maintained over consumption
                   in the new areas so that excessive demands are not imposed on water
                   delivery facilities.

                   The A.S.G. is currently conducting a leak detection survey on the trans-
                   mission system. Preliminary results indicate that the transmission
                   system is in good condition. One of the problems highlighted in the
                   survey was a lack of system mapping. Being able to determine the loca-
                   tion of existing pipelines, interconnections and valves is important
                   in the effective operation of the water system.

                   Booster Stations

                   Booster stations are required to increase the system's reliability in
                   the upper service areas. The villages of Vaitogi, Iliili, Futiga,
                   Pavaiai, and Mapusagafou are currently subject to shortages when either
                   the single surface source (Puna Dam) or the well at Iliili is not oper-
                   ating or cannot meet demands. The booster stations would lift water
                   from the lower service level to supplement these sources.

                   The maintenance and operation of booster pumps is also a serious problem
                   due to several factors. The moist tropical environment of American
                   Samoa shortens the life of all mechanical devices. Severe voltage drops
                   and surges are common and are extremely hard on electric motors and
                   other electrical equipment. Pumps are frequently operated under other
                   than design conditions. There is a critical shortage of technically
                   skilled manpower for the operation and maintenance of the many pumps
                   and motors. The repair staff is frequently in an operational crisis
                   because of low pressures or lack of water. A preventive maintenance
                   program is almost impossible under these conditions.   Too few standby
                   facilities are provided and spare parts are difficult to obtain so that
                   repairs are often just temporary expediences.

                                                  V-13
<pb n="100" />

                    The 100 horse power pump in the older booster station at Nuuuli is
                    operated with reported success. The actual benefit is difficult to
                    determine, however, as limited records of flow rates or pressures are
                    maintained for each station. The pump is no doubt operated in a very
                    low efficiency range as the system demands are far above the pump's
                    design flow rates. This station should be abandoned when the new booster
                    stations at Nuuuli and Pago Pago are made operational.

                    DISTRIBUTION STORAGE

                    General

                    The existing A.S.G. water system contains 3.5 million gallons of distri-
                    bution storage in the Pago Pago, Maugaalii, Blunts Point, and Tafuna

                    Reservoirs.

                    Elevated distribution storage is usually provided within distribution
                    systems to normalize system pressures and supply peak water demands.
                    Elevated distribution storage may also be provided to increase system
                    reliability and to reduce the need of constructing large main sizes
                    to the system extremities. Elevated storage facilities are designed
                    so that the system hydraulic gradients fall within the useful elevation
                    range of the tank; thus, allowing the tank to contribute its volume
                    by gravity. Facilities operated in this manner are referred to as
                    "floating" storage facilities. Elevated distribution storage provides
                    increased reliability for fire protection and for emergencies during
                    power outages or other high service pumping interruptions.

                    Operation

                    High consumption rates and limited water resources have prevented A.S.G.
                    storage reservoirs from operating as distribution system reservoirs

                                                  V-14
<pb n="101" />

                   as they were intended. Attempts to let the reservoirs "float on line"
                   in the Bay Area result in continuously empty reservoirs. Currently
                   the reservoirs store excess water accumulated during wet weather periods.
                   This excess water is pumped into the reservoirs and retained for dry
                   weather and other emergency purposes. The Pago Pago Reservoir is used
                   primarily for emergency service to the canneries and the Pago Pago area,
                   the Maugaalii Reservoir serves the downtown Fagatogo area, and the Blunts
                   Point Tank serves the hospital and Fagaalu and Gataivai Villages.

                   The problem with utilizing the reservoirs in this manner is that the
                   water system loses its ability to draw from the reservoirs during the
                   peak hour demands of each day. All supplies must come directly from
                   the sources, which overloads the capacity of the source and the trans-
                   mission mains and results in low operating pressures throughout the
                   system.

                   Capacity

                   The Tafuna area and upper service areas around Futiga and Pavaiai are
                   deficient in storage facilities for current peak hour and fire reserve
                   demands. Existing storage is limited to 0.5 million gallons at Tafuna
                   and 90,000 gallons near Mapusagafou. A 0.75 million gallon reservoir
                   is under construction at Pavaiai. The three million gallons of storage
                   capacity in the Bay Area is adequate for existing peak hour and fire

                   demands if the reservoir water levels can be maintained.

                   Maintenance

                   All of the existing reservoirs require painting and repair of automatic
                   control valves before they can float on line. The reservoir at Pago
                   Pago is currently threatened by an active earth slide.

                                                   V-15
<pb n="102" />

                   DISTRIBUTION SYSTEM

                   General

                   The existing distribution system is and has been a source of problems
                   for the water system for many years. Austin-Smith &amp; Associates pointed
                   to excessive water use in the initial 1963 report on the A.S.G. water
                   system. Most of the subsequent water studies also noted excessive water
                   demands as a major problem.

                   Data collected by the Department of Public Works covering the period
                   from October 1977 to January 1978 indicates that nearly half of the
                   water used cannot be accounted for (Appendix A). This does not mean
                   that it is not metered, but it means that after estimating all normal
                   residential, commercial and industrial use, nearly an equal amount is
                   lost somewhere within the system.

                   Water Consumption

                   Only about a quarter of all water consumed is metered, but the metered
                   residential customers average only 56 gallons per capita per day in
                   consumption. This figure has been indirectly calculated and is only
                   approximate, but it reflects the amount of conservation that can be
                   obtained through metering and nominal water use charges. Total resi-
                   dential water use among metered and non-metered customers is estimated
                   at 285 gallons per capita per day. This figure includes the unaccounted
                   for water and illustrates how great a problem the excessive water con-
                   sumption is to the water system. For comparative purposes, 150 gallons
                   per capita per day would be considered a generous consumption rate for

                   an area like American Samoa.

                                                  V-16
<pb n="103" />

                   The unaccounted for water includes unnecessary consumption and wastage.
                   The production, transmission and distribution of this water puts a
                   strain on the system facilities, consumes unnecessary electric power
                   and has required premature investment in plant and equipment.

                   A.S.G. facilities including employee housing are not metered and do
                   not pay for water consumed. The volume of water consumed by these
                   facilities is potentially quite large as there is no incentive for
                   conservation. There should be an administrative policy developed con-
                   cerning this matter to bring about a reduction in water consumption
                   and to eliminate the double standard between A.S.G. employees and the
                   community at large.

                   Backflow

                   The negative pressures created in the pressure fringe areas during high
                   demand hours dramatically increase the possibility of backflow contami-
                   nation of the entire water system. There is little plumbing code enforce-
                   ment, and cross connections with private water systems, ground surface
                   pipelines running through pig pens or other contaminated areas and other
                   possible sources of backflow are evident throughout the distribution

                   system.

                   Most direct cross connections with the main transmission lines of vil-

                   lage systems have been reported to be eliminated or protected with
                   double check valves. Cross connections with the village systems within
                   individual homes, however, presents an equally serious potential for
                   contamination of the A.S.G. system.

                                                   V-17
<pb n="104" />

                   Water Service Policy

                   The A.S.G. has been over accommodating in the past in providing service
                   to customers. Service laterals extend far from main pipelines to the
                   point of consumption and meters are usually installed at or near the
                   residence. The portion of the service lateral that is behind the meter
                   becomes the maintenance responsibility of the A.S.G. as any water lost

                   would not be metered and the customer would not be concerned. Because

                   of the difficulty in obtaining right-of-way and for simple expediency,
                   the service laterals are usually constructed on the ground surface where
                   they are subject to damage and illegal connections. Most laterals are
                   either galvanized iron or plastic and are easily tapped illegally by
                   anyone desiring water. To complicate matters, most villages also have
                   private water systems. It is difficult to locate illegal connections
                   in the web of A.S.G. and private small diameter pipelines that inter-
                   twine throughout most villages.

                   The A.S.G. provides water service to customers who are above the eleva-
                   tion that will allow proper pressures in the water system. Water is
                   available to these customers only when other demands on the system are
                   low and water pressures rise. Pressures usually rise late at night
                   or in the early morning. The customers leave their taps open over a
                   large drum in an effort to collect as much water as possible during
                   the night. If the drum overflows, it is regretable, but at least a
                   full drum was collected. These high elevation fringe areas also have
                   a higher proportion of illegal connections because they are the most
                   remote from official inspections.

                   The A.S.G. needs to determine realistic service objectives for the water
                   system and to set policy and service rules and regulations based upon
                   these objectives. Even with unlimited financial, physical, and techni-
                   cal resources, the A.S.G. could not expect to be all things for all

                                                   V-18
<pb n="105" />

                   people. If standards are sacrificed in one area, customers in another
                   are deprived of a proper water service.

                   RIGHT-OF-WAY

                   General

                   Right-of-way acquisition for water system improvements has been a serious
                   problem for the Department of Public Works in recent years. Badly
                   needed projects have been delayed or halted indefinitely by extended
                   right-of-way negotiations or right-of-way disputes. Projects have been
                   modified at increased cost or at the expense of the system operating
                   efficiency in attempts to skirt right-of-way problems.

                   The Right-of-Way Program of the Department of Public Works is beset
                   with problems in the areas of setting policy guidelines, continuity
                   of trained personnel, budgeting requirements, abuse of the crop damage
                   system, and landowner and boundary disputes.

                   History and Legal Precedence

                   The American Samoa Government aquisition of Samoan lands can be traced
                   back to the United States Navy Administration of Samoa (C.A. No. 199-
                   1964). The court has determined that since land owned by Samoans before
                   the deed of cession to the United States in 1900 was retained by the
                   Samoans after 1900, the land could only be obtained by the A.S.G. by
                   negotiation or by condemnation under eminent domain (C.A. No. 25-1962).

                   The right of eminent domain is the power of a sovereign state to take
                   or to authorize the taking of property in its jurisdiction for public

                   use without the owner's consent. Eminent domain is an inherent sovereign

                                                   V-19
<pb n="106" />

                   right, founded on the common necessity and interest, to appropriate
                   property of individuals for the greater needs of the community. The
                   right of eminent domain is given to the American Samoa Government in
                   Title 27, Section 1601 and Title II, Section 6401 through 6467 of the
                   American Samoa Code. The power of eminent domain can be exercised only
                   for what is deemed a public use and where just compensation is given.

                   The High Court of American Samoa has taken judicial notice (Rule of
                   Evidence 201 of the High Court of American Samoa) that the most valuable
                   tangible thing that Samoans possess is their land (C.A. No. 199-1964).
                   In 1900 the U.S. Commander condemned land for a public highway, and
                   it was deemed an appropriation for public use (C.A. No. 25-1962). The
                   High Court of American Samoa determined that when condemnation proceed-
                   ings are made for public use and when just compensation is paid, then
                   it does not violate due process of law (C.A. No. 25-1950). The Court
                   also found that land taken by the A.S.G. is not against the interest
                   of the Samoan people, because the property is held by the A.S.G. for
                   the use and benefit of all the people of American Samoa (App. Div. No.
                   15-1963).

                   In Re Matter Condemnation of Pago Pago Well Property , 1951, (2 A.S.R.
                   614), land in Pago Pago was taken by condemnation proceedings. In 1954,
                   the American Samoa Government in The Matter of the Acquisition of Land
                   for the Construction of the Airport (C.A. 15-1959), obtained a judgment
                   from the High Court of American Samoa, condemning 550.83 acres of land
                   at Tafuna for a public airport and granting ownership in fee simple
                   to the Government of American Samoa. Fair compensation was set by the

                   Court as follows:

                         1.  $135 per acre for land cleared but without any plantation

                             on it.
                        2.   $140 per acre for bush or jungle land.

                                                   V-20
<pb n="107" />

                        3.   $380 per acre for land including the plantations thereon,
                             the ownership of such land and the plantations being combined
                             in the same family, families, person or persons.
                        4.   $135 per acre for land (i.e., the land alone) on which there
                             were plantations at the time of the taking, the ownership
                             of the land and of the plantations theron being separated,
                             i.e., not combined in the same family, families, person or

                             persons.
                        5.   $245 per acre of plantations (i.e., for the plantations alone),
                             the ownership of the land and the plantations thereon being
                             separated at the time of the taking, i.e., not combined in
                             the same family, families, person or persons.

                   In 1961, in The Matter of the Condemnation of Dairy Farm Hansen's Disease
                   Sanitarium Area and Access Roadway (3 A.S.R. 439), the A.S.G. filed
                   a notice that there existed a dispute among the claimants regarding
                   the ownership of the property and requested that the Court determine
                   its ownership. The Court rendered a determination after a trial on
                   the issue of ownership for the purpose of distribution of the condemna-

                   tion award.

                   The condemnation proceedings used by the American Samoa Government in
                   the Pago Pago Well Condemnation, Airport Acquisition, and the Dairy
                   Farm cases were the same or similar to the condemnation proceedings
                   provided for in the Revised Code of American Samoa. The Revised Code
                   of American Samoa provides condemnation proceedings where the A.S.G.
                   desires to acquire any land, easement, right-of-way, or other property
                   interest for public use. The code provides for the right of compensa-
                   tion, the determination and award of compensation, disposition of dis-
                   putes to title, the arbitration of compensation disputes and the appeal

                   process.

                                                   V-21
<pb n="108" />

                    In seeking to set forth guidelines for Right-of-Way acquisitions by
                    the Department of Public Works, a Right-of-Way Manual was prepared.
                    The manual provides general guidelines for organization of a Right-of-
                    Way Branch, sets procedures for right-of-way acquisitions, the execution
                    of instruments, the closing procedures, lead time or advance notice
                    procedures, condemnation guidelines,payment of crop damage, and the
                    relocation assistance regulations under the Uniform Relocation Assis-
                    tance and Real Property Acquisition Policies Act of 1970 (27 A.S.C.
                    2001).

                    Right-of-Way Policy

                    Policy problems may have resulted from the lack of continuity in the
                    executive administration of the Territory of American Samoa. The Terri-
                    tory has had five appointed Governors and one elected Governor during
                    the past five years. It is difficult to reconstruct the right-of-way
                    policy for each administration, but it would appear from a review of
                    the present situation that no substantive policy has been adopted.

                    A right-of-way policy is essential to the establishment of a viable
                    program that will reduce delays during the negotiation stages of right-
                    of-way acquisitions or when negotiation fails to result in an agreement
                    and condemnation proceedings are initiated.

                    The problem with setting a viable right-of-way policy may also be attri-
                    buted to the high turnover of A.S.G. contract employees in Public Works
                    Department and the lack of a training program to train local personnel
                    to administer a right-of-way acquisition program.

                    Crop Damage

                    Under the crop damage schedule, the owner receives fixed compensation
                    for a list of "cash" crops destroyed by reason of the right-of-way

                                                   V-22
<pb n="109" />

                     acquisition in addition to payment for the right-of-way. The
                     continued use by the A.S.G. of this system allows for abuses by
                     the landowner. Crop damage abuse cases reported by the Department
                     of Public Works have included the planting of crops within the
                     area of the right-of-way after negotiations have begun and claims
                     for crops destroyed which were not affected by the right-of-way
                     acquisition. The inherent abuses within this system exist because
                     of the lack of definite guidelines for Right-of-Way Personnel and
                     the lack of trained personnel that are bonded under surety to
                     certify the accounting of the damage and the payment made to the
                     landowner.

                     Budgetary Policy

                     There also exists a budgetary problem in regards to negotiating ease-
                     ments or leases for right-of-way acquisitions. In a situation where
                     the right-of-way acquisition allows for monthly or annual payments,
                     the landowner often requests an advance payment for the amount due over
                     the term of the lease. The advance payment decreases the available
                     money in the current budget and may not be adjusted in the next annual
                     budget. The limited funds may limit the A.S.G. ability to negotiate
                     fair compensation for required right-of-way acquisitions.

                     Land Title Registration

                     Most of the communal land in the Territory of American Samoa has not
                     been surveyed and registered. Communal land ownership under the autho-
                     rity (pule) of the chief (matai) is subject to boundary disputes and
                     disputes of actual ownership because of the lack of recorded boundaries.
                     A common Droblem has.been that the A.S.G. will enter into an agreement
                     with a matai or a person who represents himself as the owner but is
                     not the true owner or is only one of the owners. There is no formal
                     procedure whereby the A.S.G. can obtain a verification of land ownership

                                                       V-23
<pb n="110" />

               of communal land when the land has not been duly recorded. American
               Samoa does not have a title insurance company that can give certifi-
               cation of title to lands subject to right-of-way acquisitions.

               The recordation of land sales and lease rentals does not have gran     tor-
               grantee index or a cross-index system to obtain an abstract of the sale.

               The same problem exists with the recordation of leases. The problem
               of the lack of registration of title to land in the Territory of American
               Samoa is indirectly related to the lack of adequate recordation of land
               sales and lease rentals in the Office of the Territorial Registrar.
               Land sale prices and lease rentals can be obtained by reviewing the

               Native Land Transfer Volumes and Native Lease Volumes in the Office

               of the Territorial Registrar, but the process is very time consuming.
               The present system provides for the recordation of the land sale or
               the lease by the village, the "name of the land", and in chronological
               order of presentation for recordation.

               Past experience has shown that when the A.S.G.-personnel enter into
               an agreement with the wrong landowner or with only one of the landowners,
               a matai or person believing to have a claim on the land will file a
               temporary restraining order against the American Samoa Government and
               the alleged landowner. The temporary restraining order will seek to
               have a preliminary injunction until ownership is determined in a trial
               in the Land and Titles Division of the High Court of American Samoa.
               Under the laws of American Samoa, any matter involving a land dispute

               must be referred to the Office of Samoan Affairs for at least two meet-

               ings and if the matter is not resolved, then a certificate of irrecon-
               cilable lispute is filed for trial with the High Court of American
               Samoa. This process is very time consuming and can result in delaying
               the matter for several years. Most temporary restraining orders in
               land dispute matters are granted without the posting of a bond and are
               easily obtainable upon merely filing a Complaint for Injunctive Relief,

                                                V-24
<pb n="111" />

                   with an affidavit alleging irreparable damage and no adequate remedy

                   at law to support a temporary restraining order.

                   VILLAGE SYSTEMS

                   General

                   There are over 40 villages that have water systems that are completely
                   independent from the A.S.G. water system, except to the extent that
                   they request A.S.G. assistance for repair or expansion to the system,
                   or that they have schools or other A.S.G. facilities in them. There
                   are probably an equal number of villages which maintain private water
                   systems while using the A.S.G. water system as a backup sUpply.

                   Village water systems are distinguished from the A.S.G. water system
                   for several reasons. The most significant of which is that the resi-

                   dents of American Samoa draw a careful distinction between them. The

                   A.S.G. water system is the one that attempts to charge for water through
                   the use of meters or flat rate use charges.

                   It is difficult to generalize about so many individual systems, each
                   of which has features which make it unique from the others. There are,
                   however, similarities that apply to the majority of the village water

                   systems and these similarities will be discussed here.

                   Generally, village water systems are small, unplanned systems that have
                   been developed over time to supply water to a village or a portion of
                   a village. They have usually been constructed to provide minimal domes-
                   tic flows. Pipe sizes are generally under two inches in diameter and
                   storage is limited to that available behind the stream catchment (usually
                   less than 2,000 gallons). The water supply is.generally derived from

                                                   V-25
<pb n="112" />

                   surface water streams. With very few exceptions, these supplies are

                   inadequate during the dry season.

                   The more remote the villages are from the westernized center in the
                   Bay and Tafuna areas, the more independent from the A.S.G. they are
                   in the administration of their villages. This independence is by design
                   of the village councils who do not want control of village affairs to
                   go to outside forces. The strict control over family and village life
                   is part of the fabric of the Samoan culture. Almost without exception,

                   the villages want to maintain control over their water systems, to
                   maintain their independence and to avoid paying for water service.
                   It is very difficult to explain to the villagers that the water charge
                   is not actually for the water, but for the delivery and treatment system.

                   Water Quality

                   None of the villages treat their water in any way and the quality of
                   water is usually very poor (Table V-5 and Figure V-1). The watersheds
                   behind the catchment dams are cultivated by villagers and often are
                   foraged by pigs. Suggestions to limit access or to set aside protected
                   watersheds have been flatly refused by villagers since much of the vil-
                   lage food supply comes from plantations situated in these watersheds.
                   The ownership and control of these lands is vested in different family
                   chiefs. Restricting the use of land by one or more families could cause
                   serious political and cultural problems within the village.

                   The major difficulty with independent village water systems is that
                   few villages have the technical or managerial ability to operate a
                   reliable water system. The villages have gotten by in the past with
                   the simple stream catchment systems when the expectations for the system
                   were low. The villages are growing now, and almost all homes have
                   indoor plumbing. The value of these homes is increasing, and they

                                                   V-26
<pb n="113" />

                                                 ASSESSMENT OF WATER SYSTEMS

                                                            AMERICAN SAMOA

                                                            TABLE V-5

                                              SOME WATER RELATED DISEASES

                                          REPORTED TO LBJ MEDICAL CENTER

                                                         1971      1972       1973      1974       1975      1976
                     Amebiasis                              6         0         0          1          0         2
                     Bacillary Dysentery
                     (Shigellosis)                          0         1         0          0          1         1
                     Food Poisoning (Staph.)                1         2         8          2          0         0
                     Hepatitis, Infectious                  13      51          13       24          44        14
                     Infantile Diarrhea
                     (Hospital only)                     155       130         120       119        126       132
                     Salmonellosis                          3         1         0          2          0         4
                     Trachoma                               9         4         0          0          0         0

                        It should be kept in mind that often Samoans do not seek medical
                        treatment for "mild diseases" such as gastroenteritis and dysentery.

                     Source: -1977 Annual Report to the Secretary of the Interior.

                                                               V-27
<pb n="114" />

                                               ASSESSMENT OF WATER SYSTEMS

                                                        AMERICAN SAMOA

                                                          FIGURE V- I

                                        PUBLIC NOTICE OF POOR WATER QUALITY

                                                PUBLIC NOTICE

                                           The Department of Health advises the follow-
                                     ing villages, Fagasa, Masausi, Masefau, Aoa, Ploa,
                                     Amanave, Agugulu, Se'etaga, Ataulama, Amaluia,
                                     Leone, Malaeloa, Ili'ili, Pava'ia'i and Faleniu to boil
                                     their drinking water for 20 minutes before con-
                                     sumption. The Public Health Laboratory Monitor-
                                     ing reports last week indicated that your water is
                                     unsuitable for drinking purposes.

                                           You are strongly advised to stay away from
                                     streams and areas where catchments are located in
                                     order to eliminate contamination. You are also
                                     reminded that stray pigs and other domestic
                                     animals be kept away from these areas.

                                                    FAAALIGA

                                           Ua Fautuaina e le Ofisa o le Soif ua Maloloina
                                     le MGMGIU o alafaga nei:            Fagasa, Masausi,
                                     Masefau, Aoa, Poloa, Amanave, Agugulu, Se'etaga,
                                     Atauloma, Amaluia, Leone, Malaeloa, Ili'ili,
                                     Pava'ai'i ma Faleniu, ina la faapunaina lelei le
                                     suavai mo le 20 minute a e le'i faaaogaina mo le
                                     taumafa. Ua facalia i su'esu'ega a le Ofisa o le
                                     Soifua Maloloina i le vaiaso ua ta'a, le le talafeagai
                                     o le suavai mo le taumafa.

                                           E lapata'i atu i lo outou marnalu ina la
                                     alo'alo ese mai vaitafe ma faatanoa, ina la taofia ai
                                     Iona faaleagaina. E foamanatu atu foi i lo outou
                                     mamalu o mea-ituo-olo ta'aloa, ma nisi mea oia la
                                     teena mai nei laufanua.

                                     Source: Samoa News, Friday, May 19, 1978, Vol. 8-5187

                                                              V-28
<pb n="115" />

                   warrant fire protection. Villagers are beginning to recognize the
                   health benefits of a quality water supply, and federal regulations (PL
                   93-523) will soon place strict requirements over the quality of water
                   that may be supplied in any water system with 25 or more consumers.

                   American Samoa Government Policy

                   The A.S.G. lacks a clear or workable policy for dealing with the village
                   water systems. While customers on the A.S.G. system are required to
                   pay for water service with the explanation.that the revenues indirectly
                   go toward the operating and maintenance costs for the water system,
                   in contrast, if a village keeps requesting assistance, they will eventu-
                   ally get free repair service or funds for improvements to their water
                   systems. In some instances, the A.S.G. will provide assistance to a
                   village that also has access to the A.S.G. water system. It is not
                   surprising, therefore, to find that people on the A.S.G. water system
                   are reluctant to pay for water service. The A.S.G. water system mainte-
                   nance and operation staff is over-committed to the task of caring for
                   the A.S.G. water system, and time spent with village systems is taken
                   from the customers of the A.S.G. system.

                   The problem is not always clear out or simple. In many villages, the
                   A.S.G. has built schools, housing, dispensaries or offices. These
                   facilities depend upon the village water system for their water supply,
                   and the A.S.G. is obliged to make the repairs to the system necessary
                   to provide service. Unfortunately, the systems are not adequately
                   maintained, properly managed or constructed for sufficient capacity
                   to meet demands. It becomes an impossible, never ending task to keep
                   the systems operating just enough to provide water to the A.S.G. faci-
                   lity.

                                                   V-29
<pb n="116" />

                   Past Improvement Programs

                   The A.S.G. has attempted wholesale improvements to the privately oper-
                   ated village water systems on several occasions. In the early 1960s,
                   a cooperative improvement program to improve the village water system
                   in the Leone area was attempted. Distribution lines and storage reser-
                   voirs were constructed throughout the villages of Leone, Puapua, Malaeloa,
                   Taputimu and Vailoatai utilizing the stream catchment intake constructed
                   by the military during WWII as the main supply source. The system has
                   never operated correctly, and the storage reservoirs have deteriorated
                   to a point of uselessness.

                   Leone Village receives the bulk of the water as it is closer to the
                   source and lowest in elevation on the system while the upper villages
                   receive water only periodically. The villagers report that because
                   of cost overruns, the project was never completed properly and the
                   A.S.G. did not live up to its end of the bargain. The system receives
                   little or no management or maintenance.

                   In 1961, the A.S.G. completed projects near the villages of Asili in
                   the Western District and Fagaitua in the Eastern District. Each of
                   the projects interconnected villages in an attempt to more evenly dis-
                   tribute available water among the villages involved. Unfortunately,
                   the A.S.G. did not discuss this concept with the villages before the
                   systems were constructed. The villages with water were reluctant to
                   give water to other villages without assurances that there would still
                   be an ample supply remaining. The A.S.G. could not identify any group
                   that was willing to assume responsibility for operation and maintenance
                   of the systems. As a result, the systems are used very little and by
                   default are maintained by the A.S.G.

                                                  V-30
<pb n="117" />

                   In 1972, the A.S.G. received a grant from the Economic Development
                   Administration for improvements to approximately 38 village water sys-
                   tems. The grant was obtained in response to the severe drought of 1971
                   which caused many hardships for the villages.

                   The success of this village water system program has been mixed. While
                   some of the systems are operating satisfactorily, there are many which
                   do not. There are several reasons for the problems:

                        1.   The scope of each individual project was determined within
                             the Public Works Department with little if any input from
                             the villages concerned.
                        2.   Because of the emergency situation, construction standards
                             were reduced so that improvements could be made in as many
                             villages as possible.
                        3.   No provision was made for operation and maintenance of the

                             systems.

                   The reduced construction standards were to have been offset by the fact
                   that the systems were to become the property of the village in which
                   they were constructed. Ownership by village could provide a degree
                   of protection and careful use that would not be available in an A.S.G.
                   run system. As an example of the required construction standards,
                   distribution pipelines were not buried. As their contribution to the
                   project, the villagers were advised to bury the pipelines.

                   Because the villages had little input into the planning and had no
                   financial investment in the systems, they view the systems as belonging
                   to the A.S.G. They feel that the responsibility for maintenance and
                   protection of the systems also belongs to the A.S.G., and when the
                   systems break down, they expect repairs to come from the A.S.G.

                                                   V-31
<pb n="118" />

                   There is no operational control over the systems and no village orga-
                   nization with the technical capabilities or financial resources to
                   repair the systems. When water is available, there is misuse and waste,
                   and the systems which were designed to operate on a distribution storage
                   principle fail because the storage tanks never fill. Sooner or later,
                   the A.S.G. is obliged to undertake repairs, especially when the system
                   serves a school, dispensary or other A.S.G. facility.

                   The problems associated with village systems become more acute with
                   increasing populations, rising consumption and rising expectations for
                   the quality of service.

                                                   V-32
<pb n="119" />

                 WATER SYSTEMS MANAGEMENT

                 General

                 The existing public water supply system in American Samoa is a mixture
                 of governmental (A.S.G.) systems and village systems. Historically, the
                 management of these systems has been loosely structured, and management
                 and operation decisions have been made without the benefit of policy
                 guidance, objectives, or written procedures. The need to meet chronic
                 water shortages and expediency in filling village desires has often
                 overshadowed consistent management policy and has served to confuse the
                 overall management of the territory's water systems. Recently, the
                 A.S.G, began to define the management objectives of all A.S.G. water
                 systems in the territory.

                 The purpose of this section is to describe the existing management of
                 the water systems and recommended improvements. For the purpose of this
                 study, water system management encompasses planning, design, operation,

                 and maintenance.

                 The Management of the American Samoa Government Water Systems is the
                 responsibility of the Department of Public Works (DPW). The current
                 Department organization is shown on Figure V-2. Water system planning
                 and design functions are the responsibility of the Water Systems Divi-
                 sion (WSD), while operation and maintenance functions are the responsi-
                 bility of the Water, Sewer, and Solid Waste Division (WSSW). In addi-
                 tion, the Director of Public Works has retained a consulting engineering
                 company to specifically examine water system leakage and pump perfor-
                 mance, and has formed special task forces for the installation of new
                 distribution lines/booster pumps and water line inspection. These posi-
                 tive steps will greatly improve water system operation and management.

                                                    V-33
<pb n="120" />

                                                                           ASSESSMENT OF WATER SYSTEMS

                                                                                    AMERICAN SAMOA

                                                                                     FIGURE V-2

                                                                              ORGANIZATION CHART
                                                                       DEPARTMENT OF PUBLIC WORKS

                                                    AssiSTA                              DIRECT
                                                ATTORNEY GE                           OF PUBL I C
                                                            -T

                              ELECTRIC              FACILITIES              WATER, SEWER           WATER SYSTEMS           DMINISTRATION            ENGINE
                              UTILITY                Divisi               I&amp; SOLID WASTE             DIVISIONS               DIVISION                SERVI
                              DIVISION                                       DIVISION

                                                      INCLUDING

                                                      FORMER
                                                   CONSTRUC TION
                                                     DIVISION
                                                   --7
                                                         AND                                        MOTOR POOL             IVIL OIVIS:.O]N
                                                                                                                         LC

                                                         AN                                                                 INCLUDING

                                                  [-Mml   &amp;                                                             TECHNICAL .SERVICES
                                                                                                                             DIVISION
                                                                                                                                                  @ENG NE
                              ELE CT.-C                                                                                                          L     I
                              UT.  ITY                                                                                                              S ER  V.
                              J)IV Lq.S.ON
<pb n="121" />

                The water system management functions within the Department are sum-
                marized on Figure V-3.

                Planning and Design of water system facilities is the responsibility of
                the DPW Water Systems Division. Staffing consists of a division direc-
                tor and project engineers in charge of distribution systems, pump sta-
                tions, and ground water. Other staff engineers and draftsmen from DPW
                are also available on an as-needed basis. Developed plans and specifi-
                cations are reviewed with the water utility branch and equipment branch
                managers for operational considerations. Currently, the Division is
                primarily concerned with the design of the water system improvements in
                the existing capital improvement program (see Table V-5). There is no
                current Government of American Samoa planning or design effort underway
                for water system improvements beyond the 1981 construction program.

                Operation and Maintenance of the A.S.G. water systems is the responsi-
                bility of the DPW Water, Sewer, and Solid Waste Division. The Division
                is officially divided into five branches: solid waste, sewer, water
                utility, equipment, and special projects. However, in 1977, the water
                utility and special projects branches were consolidated and simply
                called Wate@ Utility. The emerging organization and the water system
                responsibilities of each branch of the Division are shown on Figure V-4.

                Management Problems
                Numerous problems in the planning and design as well as the operation
                and maintenance of the water system have been identified by several
                investigators, including WSSW and WSD administrators. Many of the
                administrative problems, such as a lack of formal paper flow through the
                Division, have been addressed by the existing management. Other identi-
                fied problems are being addressed through increased attention to opera-
                tions and an ambitious ongoing program of in-service training. Some of
                these identified problems, and current or recommended efforts aimed at
                solving them include:

                                                   V-35
<pb n="122" />

                                                                        ASSESSMENT OF WATER SYSTEMS
                                                                                AMERICAN SAMOA

                                                                                  FIGURE V-3

                                                                           ORGANIZATION CHART

                                                                      WATER SYSTEMS MANAGEMENT

                                                                                 DIRECTOR OF PUBLIC WORKS

                                 WATER, SEWER                                            WATER SYSTEMS                    SPECIAL TASK FORCE
                                &amp; SOLID WAST                                               DiviSION                             INSTALL:
                                  DivisioN                                                                                 1. BOOSTER P UMPS
                                                                                                                           2. NEW DIST. LINE
                                                                                                                           3. INSPECTION

           U4                   WATER UTILITY               EOUIPMENT                                 PROJECT ENGINEER                     CONSULTANT
                                                       L     BR NCH                                     DISTRO13UTION                   ECIAL AssIGNME
                                                                                                                                            LEAKS
                                                                                                                                     F  Pump AssESSMEN

                                             DiSTRIOUTIO                                              PROJECT ENGINEER
                                               SECTION                                                  GROUND WATER
                                                                                                        DEVELOPMENT

                                                                               SOL D WAST
                                                                                  'BRANCH             PROJECT ENGINEER
                                                                                                       PUMP STATIONS
                                       LFETE     RING AN.
                                             C, .EC'. ON:
<pb n="123" />

                                                                    ASSESSMENT OF W&amp;TER SYSTEMS

                                                                            AMERICAN SAMOA

                                                                              FIGURE V-4

                                                     WATER SYSTEM OPERATIONAL RESPONSIBILITIES

                                                      L    WATER, SEWER &amp; SOLID WASTE DIVISION

                                                                    EQutPmENT BRANCH                          SOL I DWASTE
                              ER U-viu-Ty BRANT.
                        Fw --l
                          OPERATION AND MAINTENANCE           MAINTENANCE OF WELL PUMPS,                        (NONE)
                             OF WATER FILTERS                    BOOSTER PUMPS
                          LEAK REPAIRS                        OPERATION AND MAINTENANCE
                          NEW ICONNE CT 'ONS                     Of CHLORINATORS
                          ELECTRICAL OPERATING COSTS
                             OF ALL METERS, PUMPS, ETC.
                          METER INSTALLATION, READING
                             AND REPAIR
                          FIRE HYOR&amp; N' 1EPIA I
                          3U BMITTAL OF WATER BILLING
                             INFORMATION TO CENTRAL
                             ACCOUNTING
                          ROUTING AND BALANCING OF
                             AVAILABLE WATER SUPPLIES
                             THROUGH DISTRIBUTION
                             SYSTEMS
<pb n="124" />

             Identified Problem                                                       Identified Solutio

             Inadequate communication within WSD causes a lack       The division should hold regular s
             of knowledge about ultimate goals and individual        improve communications between all
             roles in the program.                                   written plan should also be develo
                                                                     with changing contract engineers.

             Objectives are not established for WSD and WSSW.        Specific and realistic objectives
             Consequently, no mechanism exists for evaluation        consumption to 150 gpd, reduce del
             of employees or division accomplishment.                accounts to 10 percent, etc.) shou.
                                                                     and reviewed annually.

             The WSD is too task oriented toward component           DPW should increase operational inj
     00
             installation, lacking sufficient consideration          all projects. All new designs shoi
             of total system operation.                              any changes in operating characteri

             There is a lack of total familiarity among              Water Utility Branch objectives foi
             employees throughout DPW to objectives.                 developed, written in both Samoan E
                                                                     distributed to employees -- See Fi@

             Personnel lack necessary skills and judgmental          An in-service training program for
             knowledge of water system.                              implemented to teach basic hydrauli
                                                                     and mechanical skills. Highly trai
                                                                     being hired as vacancies appear th3
<pb n="125" />

        Identified Problem                                                 Identified Solution

        High turnover of employees in the Water Utility         All position descriptions are being exaj
        Branch occurs because of low salary levels.             written as necessary, and salaries adju

        Management procedures in WSSW are vague.                The management manual for WSSW is being
                                                                Water utility regulations should be dev
                                                                adopted through A.S.G. administrative p

        High rate (approximately 30%) of water customers        Conflicts in meter readings and billing
        are delinquent in account payments due to               resolved and accuracy is improving in m
        discrepancies in consumption and billing.               and billing preparation.

        WSSW attempts to provide water service on request       WSSW should develop rules and regulatio
        without evaluating capability or the effect on          clearly delineate the manner of providi
        on operation and management resources.                  service to customers.

        "Free water" agreements in exchange for rights-of-      DPW should identify households that rec
        way result in water waste and extension of free         water under past agreements and limit t
        water to growing extended families.                     to households existing at the time of a
                                                                volume of water should be specified in
                                                                agreements negotiated.
<pb n="126" />

         Identified Problem                                                                 Identified Solutic

         Lack of clear rights-of-way presents problem for            Insist that all facilities constructed
         maintenance and repair.                                     the maintenance responsibility of A.S.G
                                                                     adequate and clear right of way.

         No direct incentive exists for WSSW to meter or             If water systet collections cannot be c
         collect funds for water usage as funds collected            WSSW account, include metering and coll
         are credited to the general account and not to              funds among the DPW Director's responsi
         the DPW budget.

         Residential meter readings are inaccurate due to            Meter replacement/repair is receiving a
         faulty meters. High level of suspended solids in            and water system filters have received
         water supply increases meter maintenance require-           attention. Suspended solids will be re
         ments.                                                      water quality is improved.

         High leakage rate results in lack of service.               A special leak detection task force, uT
                                                                     of a consulting engineer, is pinpointir
                                                                     repair. A new distribution system is I
                                                                     where replacement is more cost effectii
<pb n="127" />

     M M M M M M M M M M M M M M N

        Identified Problem                                                        Identified Solution

        Per capita water consumption rate appears high.          A.S.G. should increase water use charge
                                                                 should be metered at all service locati
                                                                 and collections pursued as a means of e
                                                                 water conservation. In addition, the g
                                                                 should repair leaks, detect and meter i
                                                                 nections, repair faulty meters, and imp
                                                                 of meter readings.

        A.S.G. facilities, including employee housing,           A.S.G. facilities should be metered and
        are not metered, possibly creating excess con-           water services (in the same manner as el
        sumption and a double standard between the A.S.G.        services).
        and the general public.

        Improper repair equipment available to WSSW.             Equipment needs have been included in tf

        The inadequate water pressure provided to residents      WSSW should develop policy of not allowi
        above service levels promotes water waste and back-      to A.S.G. system at elevations higher th
        flow problems.                                           below storage reservoir overflow. WSSW
                                                                 building permits and ascertain that A.S.
                                                                 be provided at the proposed location. I
                                                                 not possible, A.S.G. should inform the
<pb n="128" />

         Identified Problem                                                         Identified Solution

         The legislature and general public have not been          The DPW should develop a public educati
         made fully aware of the need and components of a          under the auspices of the Safe Drinking
         well managed water system. In addition, the               that would educate the general public o
         operational procedures and improvement program of         of a safe water supply that is adequate
         the A.S.G. water system have not been fully               consistently. The program should inclu
         explained.                                                of the functions of water meters, disad
                                                                   advantages of ground water versus surfa
                                                                   structures, rules and regulations, obje
                                                                   the system as well as management, and
                                                                   for the system.

         No systems operations manual exists, and the              WSSW should prepare an operations manua
         water systems have not been mapped.                       that shows the locations of all the wat
                                                                   components.
<pb n="129" />

                                      ASSESSMENT OF WATER SYSTEMS

                                            AMERICAN SAMOA

                                             FIGURE V-5

                                 WATER UTILITY OBJECTIVES FY       178

                                   DEPARTMENT OF PUBLIC WORKS

                 1.  To provide every customer with safe potable water 24 hours per day.
                     This potable water shall meet federal standards for chlorine resi-
                     dual, coliform level and turbidity.

                 2.  To provide every service with at least 25 psi and at most 100 psi
                     water pressure. To reduce the number of trouble calls due to low
                     pressure or no water for any 3-month period to 60 or less (down from
                     700 in June-September 1977 period).

                 3.  To be able to give 36 hours advance warning to customers of any
                     scheduled water outage. To inform customers of every emergency
                     water outage before customer complains to the Water Utility.

                 4.  To be able to report accurately on a monthly and yearly basis water
                     output from all A.S.G. sources and consumption at all metered taps.
                     To be able to estimate unmetered water usage.

                 5.  To reduce the percentage of unaccounted for water (due to unknown
                     illegal connections and leaks) to 15 percent.

                 6.  To provide in service training for all water personnel. Areas shall
                     include water technology, basic hydraulics and quality plumbing and
                     pipefitting practices.

                 7.  To reduce the water accounts delinquency rate (2 months or more
                     overdue) to 15 percent.

                 8.  To meter all users including all GAS facilities connected to the
                     water system.

                 9.  To institute a more equitable rate structure which would recover all
                     operating costs.

                 10. To stay within the budget plus or minus 5 percent each quarter.

                 11. To implement high quality plumbing and pipefitting practices.

                 Source: Department of Public Works
                          Water, Sewer, and Solid Waste Division
                          Water Utility Branch

                                                   V-43
<pb n="130" />

                                 CHAPTER T
           CONCLUSIONS AND RECOMMENDATIONS
<pb n="131" />

                                                  CHAPTER VI

                                        CONCLUSIONS AND RECOMMENDATIONS

                   WATER SOURCES

                   General

                   The findings of this engineering evaluation support the American Samoa
                   Government's policy of utilizing ground water as the primary type of
                   water source for its central water system. Existing information indi-
                   cates that sufficient quantities of high quality ground water are avail-
                   able to meet year 2000 water demands for this system. The development
                   of ground water supplies, however, must be carefully managed and moni-
                   tored to insure that the safe yield of this valuable resource is not

                   exceeded.

                   Surface water impoundments presently serving the central system should
                   be maintained as emergency supplies and to supplement ground water
                   sources. In most cases, existing surface sources should be phased out
                   of operation as more ground water production wells are constructed.

                   Available hydrologic and geologic information and data pertinent to
                   the development of water sources for individual village systems are
                   generally insufficient. On-the-ground reconnaissance surveys of villages
                   with water supply problems are needed to determine what type of water
                   source development (i.e., surface or ground) should be pursued in each

                   case.

                   Ground Water Development

                   Exploratory Weli Drilling Program. The current A.Z.G. exploratory well
                   drilling program is directed at defining the ground water resources

                                                   VI-1
<pb n="132" />

                   of American Samoa. The program can be divided by area into those acti-
                   vities that explore the Tafuna-Leone aquifer and those that explore
                   small village aquifers.

                   An analysis of existing ground water data indicates that salt water

                   intrusion is a constant threat at the Tafunafou well field and cautions
                   against overdevelopment of the fresh water basal lens in this area (see
                   Appendix B). It is recommended, therefore, that the ground water develop-
                   ment program be directed to other areas in and around the Tafuna-Leone
                   plain.

                   The wide and deep Malaeimi and Malaeloa valleys appear to be promising
                   as supplemental sources of ground water for the A.S.G. system and deserve
                   to be explored. They are both relatively large basins; they are situated
                   landward of the Tafuna-Leone Plain; thus, farther from the coastline
                   and generally above the more populated areas (i.e., potential sources
                   of ground water contamination); and they may be substantial sources
                   of recharge for the Tafuna-Leone aquifer.

                   The exploratory well drilling program should also attempt to delineate
                   the limits of the Tafuna-Leone aquifer to provide direction for its
                   future development and to aid in a reliable estimate of its safe yield
                   potential.

                   The investigation of other small village aquifers should be directed
                   toward those villages which have the most critical water supply problems
                   and which are not planned to become a part of the A.S.G. centralized
                   water system.

                   The Manua Islands villages are completely dependent upon ground water
                   for supply as there are no reliable alternative sources readily avail-
                   able. Fitiuta Village has the most critical current supply problem.

                                                     VI-2
<pb n="133" />

                   Exploratory wells should be drilled on the ridge behind the village
                   as far from the shoreline as possible. If sufficient quantities of
                   ground water are encountered, two wells should be completed and fitted
                   with pumps of sufficient capacity to individually supply the village.
                   The wells and pumps will represent a sizeable investment by the A.S.G.
                   and should be operated and maintained by the A.S.G.

                   Tau and Faleasao Villages require an additional well to supplement the
                   existing drilled well at Luma High School.

                   ON and Olosega Villages require additional wells to increase capacity
                   and provide reliability to those systems. The Olosega well should
                   include capacity for Sili Village. Each of these wells can be hand
                   dug or drilled depending upon the availability of the drilling equip-
                   ment, the logistics of shipping, and the availability of labor.

                   After completion of the Manua Islands program, the exploratory program
                   should concentrate on the villages of the southeast shore of Tutuila
                   from Auto to Tula. These villages have the most critical water supply
                   problem on Tutuila Island, since few of the streams in the area are
                   perennial. A priority system listing such factors as: ground water
                   potential, A.S.G. facilities to be served, population and absence of
                   other developed resources should be compiled to provide a schedule for
                   an exploratory program. Table VI-1 shows a suggested ranking for these
                   villages of the southeast shore.

                   Production Well Construction. The construction of efficient and perma-
                   nent water wells involves two separate and distinct operations: the
                   mechanical aspects of drilling a hole in the ground and technical super-
                   vision, which includes the engineering and design of the well to fit
                   the particular hydrology and geology of subsurface conditions at each
                   individual well site. In the past 20 years, more than 60 holes have

                                                   VI-3
<pb n="134" />

                                                      ASSESSMENT OFWATER SYSTEMS

                                                              AMERICAN SAMOA

                                                              TABLE Vl- I

                                                SUGGESTED VILLAGE RANKING FOR
                                    EXPLORATORY WELLS SOUTHEAST SHORE OF TUTUILA

                                    Ground        Critical A.S.G.                 Absence
                                    Water         Facilities        Popula-       of Other
                        Village     Potential     to be Seryed      tion          Resource                Overall
                        Name        Ranking       Ranking           Ranking       Ranking       Total     Ranking
                        Auto            8             42                 6            8           26          8
                        Amaua           9             42                 8            6           27          9
                        Fagaitua        2             1                  1            5           9           2
                        Alofau          3             3                  2            1           9           1

                        Amouli          5             2                  4            4           15          5
                        Auasi           7             42                 7            3           21          6
                        Utumea          6             42                 9            33          22          7
                        Alao            4             42                 5            2           15          4

                        Tula            1             3                  3            7           14          3
                        1 Rankings indicate which village has the highest priority for each factor.
                          Lowest number indicates highest priority.
                        2 Contain no A.S.G. facilities.
                        3 Served by Ausi water system.

                                                                 VI-4
<pb n="135" />

                  been drilled on Tutuila without the benefit of technical supervision.
                  As a consequence, not enough is known about their construction other
                  than the location, depth and, in some cases, quality of water. The
                  quality and quantity of water from these holes, especially in the Tafuna-
                  Leone plain, are directly related to the uncontrolled manner in which
                  they were constructed.

                  The A.S.G. Public Works Department recently (in May 1978) acquired the
                  services of an experienced hydrogeologist and a well driller. In view
                  of past well construction problems, the results of this study strongly
                  encourage maintaining this level of technical expertise in the future.

                  Ground Water Contamination. The importance of protecting potabLe ground
                  water supplies from all sources of contamination cannot be overemphasized.
                  Once contaminated, the integrity of ground water supplies is difficult
                  to restore. Treatment, as is the case with surface water, is expensive,
                  and the economic advantage of having good natural quality ground water

                  is lost.,

                  Since drilling penetrates the surface soil (overburden) above ground
                  water sources, all drilled holes must also be viewed as potential pipe-
                  lines for introducing contaminants into subsurface supplies, and pre-
                  cautionary measures must be taken at each hole. For this reason, it
                  is recommended that a program be instituted to seal abandoned and un-
                  sealed drilled holes and wells and to insure that production and obser-
                  vation wells in use have adequate sanitary seals.

                  As a general guideline, one of the first considerations that should
                  be given in ground water development is to select favorable production
                  well sites that are above, or upstream, of anticipated sources of con-
                  tamination. Ground water under unconfined or water table conditions,

                                                   VI-5
<pb n="136" />

                   like surface water, flows by gravity. Achieving this advantage reduces
                   the need to impose strict land use controls in tributary areas.

                   Over the long-term, the protection of ground water supplies mandates
                   the strict coordination of waste collection and disposal (wastewater
                   and solid waste) and land use practices and plans with those of ground
                   water development.

                   Surface Waters

                   The short-term operation (next 20 years) of the existing surface water
                   treatment facilities at Fagaalu, Fagatogo and Pago Pago should be used
                   for emergency supplies and to serve the upper elevations of those villages
                   only until the A.S.G. ground water sources and water delivery system
                   is reliably capable of supplying water to the Bay Area (Pago Pago).

                   The existing filtration equipment should be maintained in an operable
                   condition. Expenditures on the treatment equipment should be kept to
                   a minimum and efforts at major upgrading of the equipment should not
                   be undertaken at the expense of improvements to the primary ground water

                   source.

                   The following is a list by sources of general recommendations for the
                   short-term disposition of the surface water sources:

                        1.   Puna Dam and Intake

                             Abandon as soon as the proposed transmission and booster
                             system that will supply ground water from Tafuna to Mapusagafou
                             is complete. Recommended interim, temporary improvements
                             to make the water safe for residents that are now served by
                             the source include installation of chlorination equipment
                             and repair of the 90,000 gallon Mapusagafou tank.

                                                    VI-6
<pb n="137" />

                       2.    Vaitele Dam and Intake

                             Abandon as soon as adequate and reliable supplies are avail-
                             able from the Tafuna wells. This should occur in the very
                             near future as there are four existing wells awaiting instal-
                             lation of pumps and four new wells contracted for drilling.
                       3.    Fagaalu Intake
                             Discontinue regular use of this supply as soon as adequate
                             and reliable ground water supplies from Tafuna are available
                             in the Bay Area. The existing transmission system as it
                             exists is adequate for this purpose, however, as described
                             in Chapter V, excessive demands on the system have created
                             flow rates beyond the system capacity. The reduction or

                             elimination of the excessive demands as described later in

                             this chapter will allow abandonment of this source.

                             Temporary rehabilitation of the facilities will be necessary
                             as it is anticipated that it will be at least five years
                             before the excessive-demands will be reduced. Rehabilitation
                             work should include repair and recharging the filters and
                             installation of a more positive chlorination system.

                             Fagatogo Reservoir and Upper Fagaalu Intake
                             Discontinue use as a regular source of supply to the lower
                             Bay Area service level of the A.S.G. system as soon as ade-
                             quate and reliable ground water supplies from Tafuna are
                             available in the Bay Area. This source may be kept opera-
                             tional to serve residences above the upper service limit of
                             the Bay Area lower service level. Longer term planning should

                             include a booster station to lift water from the lower service
                             level to a 'properly designed higher service level distribution

                             system.

                                                   VI-7
<pb n="138" />

                             Temporary rehabilitation of the treatment facilities is re-
                             quired and should include repair and recharging of the filters
                             and installation of a more positive chlorination system.

                        5.   Vaipito Intake
                             This source has the most protected and highest quality water
                             of all the existing surface water sources. With proper manage-
                             ment and operation of the existing facilities, it may be able
                             to supply the upper elevations of Pago Pago Village for the
                             foreseeable future.

                             The immediate improvements required to this source include
                             control of the watershed to prevent contamination, diversion
                             of overland flow away from the Vaipito Reservoir, testing,
                             and if necessary, repair of the basin for leaks, repair of
                             the filters, and installation of positive chlorination equip-
                             ment. This system will also require a review and modification
                             of current operating procedures and competent operator atten-
                             tion to bypass unsuitable water and to insure that the equip-
                             ment is operating correctly.

                             Longer term improvements should include a new upper service
                             level finished water distribution reservoir to serve the upper
                             service level and booster pumps at the filters and at the
                             lower service level to lift water to the new upper service

                             level distribution storage reservoir.

                   The long-term operation of existing surface water sources and develop-

                   ment of new surface water sources is dependent upon more extensive
                   information and experience with the ground water sources. If supple-
                   mental surface water supplies must be developed, the existing surface

                   water sources must be the first to be reevaluated. The decision will

                   be made based upon conditions that exist at that time.

                                                   VI-8
<pb n="139" />

                     It 13 difficult, if not impossible, to determine the conditions that
                     will govern this decision. It seems reasonable to assume that an objec-

                     tive will be to combine the best sources for treatment at a central
                     point(s). Based upon this, we would anticipate that the upper and lower
                     Fagaalu sources would be combined for treatment at Fagaalu and the
                     Fagatogo treatment facilities abandoned. The Vaipito intake and treat-
                     ment facilities would be upgraded and utilized for the upper service,
                     levels of Pago Pago Village.

                     Development of new surface water supplies to supplement the ground water
                     aquifer will be dependent upon the sam e future conditions, economics
                     being one of the most important. If new surface water sources are to
                     be developed, one of the important criteria for selection of the source
                     should be the relative location to the ground water supplies.

                     The existing ground water supplies are located in a relatively centra-
                     lized area, and water is transported from there along a lineal pipeline
                     system to the ends of the service area. A break in a pipeline could
                     discontinue service to large areas. Development of a surface water
                     source at a location near the end of the service area could improve
                     the reliability of the system and extend the life of the transmission
                     system by providing additional capacity.

                     With this crite ria in-mind, the most ideal location for a surface water
                     source would be in the eastern district. The perennial streams radiating
                     from Ploa Mountain (Rainmaker) have the best potential. Of these, Alega
                     stream and the Maga, Lesea and Vaitele stream complex above Laulii Village
                     have the best location as they are on the south shore of the island.
                     Investigations (Dames and Moore, 1978) of the Laulii Village stream
                     complex indicate that a sustained regulated flow ot 1.8 million gallons
                     per day could be developed. This flow rate would be adequate to supply
                     the year 2000 water demands for the south east shore of Tutuila Island,

                                                      VI-9
<pb n="140" />

                but it would require a dam of approximately 180 feet in height to develop
                this flow. The economics of constructing a dam of this magnitude in
                Samoa are very questionable. The A.S.G. should monitor flow rates in
                key streams to aid in future feasibility studies. Consideration should
                also be given to protection of the watersheds of certain key streams
                so that they will be available for development in the future.

                TRANSMISSION AND PUMPING SYSTEM

                General

                The recommended transmission system is shown in Figures VI-11, VI-12
                and VI-13. The past emphasis of the capital improvement program toward
                transmission pipelines has created a transmission system that is ade-
                quate to serve the existing A.S.G. water service area until approxi-
                mately 1990.   The projected A.S.G. system flow rates and calculated
                hydraulic grade line for the year 2000 are shown in Tables VI-2 and

                VI-3.

                Completion of Existing System

                Prior to 1990, improvements will have to be made to the pipeline sec-
                tions between Nuuuli and Fagaalu and between Utulei Village and Malaloa.
                An alternate alignment for the Utulei - Malaloa pipeline that would

                cross under the harbor near the oil dock is available. This alternate

                deserves detailed study as it would eliminate the need for new pipeline
                construction through the congested Fagatogo area, eliminate the need
                for the Pago Pago pump station, reduce the required pipe size between
                Atuu and Aua and provide a more flexible looping water system.      The
                cross bay alternate would present some severe construction difficulties
                as the 2500 foot crossing would be in water up to 150 feet deep and
                the area is used for ship achorage.

                                                VI-10
<pb n="141" />

                                                       ASSESSMENT OF WATER SYSTEMS

                                                              AMERICAN SAMOA

                                                               TABLE VI-2
                                                   PEAK YEAR 2000 FLOW RATES
                                                     FOR A.S.G. WATER SYSTEM

                                                  Year I                        Resi- 2                     Cummu-
                                                  2000       Industrial        dential         Total          lative
                                                  Popu-       Demand          Demand           Flow           Flow
                        Service Area              tion         (MGD)            (MGD)          (MGD)         (MGD)

                     Tafuna &amp; Vaitogi             3779          0.25            0.850          1.100          7.601
                     Nuuuli                       5527             -            1.244          1.244          6.501
                     Faganeaneo to
                     Fatumofuti                    786             -            0.177          0.177          5.257
                     Fagaalu                      1533          0.07            0.345          0.415          5.080
                     Utulei                       1529          0.06            0.344          0.404          4.665
                     Fagatogo                     2917          0.07            0.656          0.726          4.261
                     Pago Pago                    4126          0.80            0.928          1.728          3.535
                     Anua to Aua                  3674          0.10            0.827          0.927          1.807
                     Tafananai to   Laulii         797             -            0.179          0.179          0.880
                     Alega to Avaio                  88            -            0.020          0.020          0.701
                     Auto to Fagaitua              929          0.05            0.209          0.259          0.681
                     Alofau                        496             -            0.112          0.112          0.422
                     Amouli to Tula               1377                          0.310          0.310          0.310

                     I Per A.S.G. Development and Planning Office.
                     2 Population x 150 GPCD x 1.5 peak day factor.
                     3 Assumes no surface water inflow to system.

                                                                   VI-11
<pb n="142" />

                                                                       ASSESSMENT OF WATER SYSTEMS

                                                                              AMERICAN SAMOA

                                                                              TABLE VI-3

                                                                     HYDRAULIC GRADE LINE

                                                                  FOR A.S.G. WATER SYSTEM
                                                                    YEAR 2000 PEAK DAY FLOW

                                                                                                  Head
                                                                                       Pipe       loss                   Head     ElevG-
                                                                  Flow Rate            Size       ft        Length         loss      tion
                                          Location          NVID           GPM         (in)   -1  @Of t       (ft)         (ft)      HGL

                                   Highway near
                                   well field                                                                                        260

                                                            7.601          5278            20     5.4         2500         13.5
                                   Highway at
                                   Airport Road                                                                                      247
                                   Highway at               6.000          4167            24     1.3         2500         3.3
                                   Housing    Road                                                                                   243
                                   Highway at               5.400          3750            24     1.0         7500         7.5
                                   Coconut    Point                                                                                  236
                                                            5.257          3651            20     2.6       12,000         30.8      -
                                   Fagaalu                                                                                           201 to 255
                                                            5.080          3528            20     2.7         7500         20
                                   Utulei                                                                                            235

                                                            4.665          3240            20     2.3         4000           9
                                   Mogaalii                                                                                          224
                                                            4.261          2959            20     2.0         4200           8

                                   malalocl                                                                                          216

                                                            3.535          2455            16     4.1         1500           6
                                   Pago Booster                                                                                      210  to 255
                                                            2.607          1810            12     11.5        4000         46
                                   Pago Pago                                                                                         246
                                                            2.607          1810            12     11.5        4000         46

                                   Canneries                                                                                         200
                                                            1.807          1255            16     0.91      10,000           9
                                   Aua                                                                                               191  to 255
                                   Laulii                   0.880           600            12     1.2       13,000         16        239
                                                            0.70f           490            12     0.89        4500           4
                                   Alega                    0.681           470            12     0.89     12,000          11        235
                                   Auto                                                                                              224
                                   Alofau Booster           0.422           300            8      2.5         4000         10        214 to 320
                                                            0.310           215            8      1.5         7000         11
                                   Amouli                   0.310           215            8      1.5      18,000          27        309 to 230
                                   Tula                                                                                              203

                                                                                           VI-12
<pb n="143" />

                    The above statements are made on the premise that water consumption
                    can be reduced to a more reasonable 150 gallons per capita per day as
                    discussed in the Distribution System recommendations. Without this
                    reduction in consumption, the two pipeline improvements from Nuuuli
                    to Fagaalu and Utulei to Malaloa are required immediately.

                    Two other small projects within the existing A.S.G. water system service
                    area are the airport extension to improve service to the airport and
                    the 12-inch pipeline from the Pago Pago Reservoir Road to Siufuga.
                    Each of these two projects will enable the abandonment of an old trouble-
                    some pipeline.

                    Extension of System

                    The recommended program also includes extension of the A.S.G. system
                    eastward from Aua-Village to Tula Village at the far eastern tip of
                    the island, westward from Futiga to Amanave at the far western tip of
                    the island and up from Mapusagafou to Aoloaufou Village at the top of
                    the mountain ridge.

                    The recommendation for this expansion is based upon the assumption that
                    this is in the best interests of residents concerned and that they
                    desire to be served by the A.S.G. water system. Before any of the
                    expansion to the service of the A.S.G. water system is begun, several

                    items should be resolved:

                         1.   The A.S.G. should improve the reliability of the existing
                              system to provide sufficient quantities of high quality water,
                              and in doing so, improve its public image as being capable
                              of providing this service.
                         2.   Conduct a public education program to inform the public of
                              the managerial, public health, and safety aspects of the operm-
                              ation of water systems. Subjects covered should include such

                                                     VI-13
<pb n="144" />

                       items as: 1) Need for disinfection, 2) The reasons why
                       metering is required, and 3) The advantages and disadvantages
                       of ground water versus surface water sources.
                  3.   Insure that sufficient water supplies, transmission facilities
                       and maintenance capabilities are available to support the

                       new expanded service area.
                  4.   Ascertain that the villages involved wish to have an A.S.G.
                       water system and are willing to allow the degree of control
                       over the water system that is required for proper operation
                       of the water system. As a minimum, the villagers shouldbe
                       willing to pay for water at the prevailing metered rate,
                       donate or sell to the A.S.G. the required land area necessary
                       to construct the water system facilities, and donate or sell
                       any existing privately owned water system facilities that
                       will be incorporated into the new A.S.G. water system.

             The A.S.G is proposing to make improvements to the Leone water system
             in the near future. The A.S.G. has drilled and is operating two wells

             on the grounds of the Catholic Boys School at Malaeloa in an attempt
             to supply water to the two private Catholic schools and to the A.S.G.
             facilities at Leone. The privately operated Leone water system has

             been unable or unwilling to upgrade its system to meet rising demands

             for water and has forced the A.S.G. to step in and provide the addi-
             tional water supplies without charge.

             In addition to the wells, the A.S.G. is currently designing the Western
             Loop pipeline project which will distribute water throughout the Leone
             area. The A.S.G. should be extremely careful in the design of this
             project to maintain control over these new pipelines and avoid connect-
             ing into the existing distribution system unless it is upgraded and
             all existing services are metered.

                                             VI-14
<pb n="145" />

                   The residents of the Leone area should bekept thoroughly informed and
                   their concerns should be reflected in the design of the water system.
                   The project should not continue into the construction stage unless there
                   is agreement between the residents and the A.S.G. on the design concepts
                   and the future operation and management of the system. Some of the

                   points that need to be clarified include:

                       1.   Will the A.S.G. or the villages be responsible for maintenance
                            and operation of the new system9
                       2.   What portions of the existing Leone water system will be
                            incorporated into the new system?

                       3.   Will the water services be metered?
                       4.   How will the existing surface water sources at Leone and
                            Malaeloa be incorporated into the new system?
                       5.   If the A.S.G. is going to operate and manage the system, what
                            rights will they have over the incorporated portions of the
                            existing system and the existing surface water sources?

                   Booster Stations

                   The Aua and Alofau Booster Pumping Stations will be required when the
                   water transmission system is expanded easterly beyond Aua Village.
                   With the indicated sizes on the new pipelines, these booster stations
                   will be able to supply water to Tula Village on the east end of the
                   island. The Alofau booster station is required to lift water above
                   and beyond the high elevation roadway at Cape Fogausa.

                   The Iliili booster station should be sized with sufficient capacity
                   and head to lift water to the Futiga reservoir for service to Futiga,
                   Pavaiai, Iliili, the Leone Plain villages, and the villages from Leone
                   to Amanave. This pump station can serve as a backup supply to the

                   Malaeloa well field.

                                                   VI-15
<pb n="146" />

                   The Futiga booster station will be used to lift water from the second
                   service level Futiga Reservoir to the third level Mapusagafou #1 Reser-
                   voir. The pumps should have sufficient capacity to serve Futiga, Pavaiai,
                   Mapusagafou, Mapusaga and Aoloaufou villages. This booster station
                   will serve as a backup to the Pavaiai and Mapusaga (A.S.C.C.) booster

                   stations.

                   The Mapusaga (A.S.C.C.) booster station should be sized to lift water
                   to the Pavaiai Reservoir and should have sufficient capacity to serve
                   the villages of Mapusaga, Pavaiai, Futiga, Mapusagafou and Aoloaufou.

                   The Pavaiai booster station should lift water the next step into service
                   level three and supply the villages of Futiga, Pavaiai, Mapusagafou

                   and Aoloaufou.

                   The Map@sagafou 2222 stations numbers one through four should be sized
                   to progressively lift the required amount of water from service level

                   three to service level seven.

                   The Malaeloa well pumps will lift water directly to the second service
                   level Futiga Reservoir. Water can be dropped from this re servoir to
                   Amanave at the western tip of the island and can also be used to supple-

                   ment the Tafunafou well field.

                   Residences in Fagatogo and Pago Pago villages are being constructed
                   at an elevation that requires the creation of a second service level
                   in these villages. When the distribution system is rehabilitated in
                   these villages, provisions for the second level and for the booster
                   pumps should be provided.

                                                    VI-16
<pb n="147" />

                   STORAGE

                   General

                   The functions of a water system storage facilities are to:

                        1.   Meet peak demand rates.
                        2.   Supply fire fighting requirements.
                        3.   Provide operational flexibility.
                        4.   Provide pressure and flow equalization.
                        5.   Provide system reliability.
                   The only quantitative functions are those relating to peak and fire
                   demands. The other functions are equally important, but are more charac-
                   teristic of the management and operation of each system.

                   The recommended additional storage capacity required to meet the year
                   2000 demands is shown in Table VI-4. The requirements were determined
                   according to the design criteria developed in Chapter IV and included
                   capacity for peak hour flow reserve and fire reserves.

                   In order to maintain system pressure and flow requirements during periods
                   of peak water use, elevated storage should be located in the areas having
                   the lowest system pressures during intervals of high water use. These

                   areas are usually those of greatest water demand or those most remote
                   from pump stations. Elevated tanks are generally located at some dis-
                   tance from pump stations serving the same distribution pressure level,
                   but not outside the boundaries of the service area unless the facility

                   can be placed on a hill near the service area.

                   Additional considerations for siting of elevated storage are terrain
                   conditions, suitability of subsurface and/or rock for foundation purposes.,
                   and hazards of low-flying aircraft, especially near airports. Elevated

                                                     VI-17
<pb n="148" />

                                                     ASSESSMENT OF WATER SYSTEMS

                                                            AMERICAN SAMOA

                                                              TABLE V1-4

                                                   RECOMMENDED ADDITIONAL

                                                        STORAGE CAPACITY

                                                                                                Total
                                                                                 Existing       Recom.        Recom.
                                                                                 Storage        Storage       New
                                                           Service               Capacity       Capacity      Reservoir
                      Reservoir Names                      Area                    (MG)           (MG)          (MG)
                      Amanave                   Amanave, Failolo                                  0.75         0.50 5
                      Autauloma                 Seetaga to Asili                                  -            0.50
                      Taputimu                  Leone, Vailoatai,
                                                Taputimu                                          1.5          1.5
                      Futiga                    Futiga, Pavaiai, 11iiii,                                            2
                                                Malaeloa, Puapua                                  0.25         2.5
                      Mapusagafou # I           Mapusagafou                            -          1.0          1.0
                      Mapusagafou #2            Mapusagafou                            -          0.25         0.25
                      Mapusagafou #3            Mapusagaf ou                           -          0.25         0.25
                      Mapusagafou #4            Mapusagafou                            -          0.25         0.25
                      lHill                                                            -          0.50
                      Vaitogi                   Vaitogi, Tafuna, Nuuuli                -          0.50         1.5
                      Tafuna                    Vaitogi, Tafuna, Nuuuli            0.50           2.0          2.0
                      Pavaiai                   Mapusaga                           0.75           0.75          -
                      Blunts Point,
                      Maugaalii                 Fagaalu, Utulei                    2.0            2.0           -
                      Pago Pago, Atuu,
                      Aua                       Pago Pago to Aua                   2.0            3.0          1.0
                      Laulii                    Laulii to Alega                        -          0.25         0.25
                      Fagaitua                  Auto to Utumea                         -          0.50         0.50
                      Leva Point                Amouli to Utumea                       -          0.50         0.50
                      Tula                      Tula, Alao                             -          -            0.25 5
                      1 From Table IV-8.                  TOTAL                    5.25         14.25         12.75
                      2 Provide approximately one day storage reserve for gravity supplyto all villages
                        west of Futiga in power outage or other emergency.
                      3 Service provided from Futiga Reservoir, separate reservoir not required.
                      4 Serve booster stations to Bay Area and potential high demand Tafuna-Nuuuli
                        area provide 1.5 MG reserve storage for operational feasibility.

                        Provide added storage at end of line.
                                                                VI-18
<pb n="149" />

                    tanks are normally built on the highest available ground so as to mini-
                    mize the required construction heights.

                    The majority of the reservoir capacities and locations require no special
                    comments as to their size and location as the data is directly from
                    the criteria. The tank locations shown are approximate. Generally,
                    the tanks can be moved around within their service area to a site that

                    presents the least obstacles as far as physical construction, right-
                    of-way, cultural, or environmental concerns.

                    Reservoir Location and Capacities

                    The Aua Reservoir is shown at base elevation 175 feet because that is
                    the way it has been previously designed. Right-of-way for the reservoir
                    has been obtained and construction is planned for the very near future.
                    By setting the reservoir at an elevation lower than the standard 190
                    feet, the flexibility for future changes in the water system and effi-
                    ciency of use of stored water is greatly reduced. Consideration should
                    be given to redesigning this tank for a base elevation of 190 feet above

                    sea level.

                    The Tafuna, Nuuuli and Vaitogi service area storage requirement has
                    been divided into two separate reservoirs, one near the Malaeimi well
                    field (Tafuna Reservoir) and one near Iliili Village (Vaitogi Reservoir).
                    The Vaitogi Reservoir storage capacity at the far end of the service
                    level from the Tafuna well field source will provide better pressure
                    distribution at peak hour flows and will facilitate using the airport/
                    Iliili pipeline for backup transfer of water to Leone. The Vaitogi
                    tank site will also provide an easier site for tank construction, but
                    will require an added connecting pipeline. An additional 1.5 million
                    gallons of storage capacity has been added to the volume called for
                    in the criteria to provide operational flexibility and system reliability.

                                                     VI-19
<pb n="150" />

              The Tafuna-Nuuuli area has a high potential for development and will
              require significant volumes of water. Water stored in this service
              level provides the source supply for the entire system to the east.
              The added volume will provide a reserve for short-term loss of supply

              from the Tafunafou wells.

              The Futiga Reservoir has been located and sized to supply the villages
              of Malaeloa, Puapua and Iliili. Added capacity has been provided for
              operational flexibility and system reliability. With the indicated
              2.5 million gallons of  storage, the reservoir can supply by gravity
              approximately one day's demand to all villages west of Futiga. The
              water would also be available by gravity to the Vaitogi, Tafuna and

              Nuuuli area.

              The Futiga Reservoir would be supplied primarily from the wells at
              Malaeloa. Discharge pressures on the well pumps should be designed
              for direct supply to the reservoir. The reservoir can also be supplied
              with water from the Tafunafou well field by the Iliili booster station
              or more indirectly by lifting water at the Mapusaga (A.S.C.C.) and
              Pavaiai booster stations and then dropping back down at the Futiga

              pressure reducing valve.

              The Leone service level will be supplied from storage in the Taputimu
              reservoir. The Taputimu location is recommended over a previously
              considered site near Leone because the Taputimu site is superior from

              an ease of construction viewpoint. The Leone site is somewhat better

              func tionally because it is closer to the Leone population center, but

              either site would be acceptable.

                                                VI-20
<pb n="151" />

                    TREATMENT

                    General

                    The treatment of existing and proposed A.S.G. water system supplies
                    can be divided into two general areas, existing surface water supplies
                    and existing and new ground water supplies.

                    Existing Surface Water Supplies

                    The treatment of the existing surface water supplies at Puna Dam, Fagaalu,
                    Fagatogo and Pago Pago should be rehabilitated as described in the
                    previous section on "Surface Water" in this chapter. Generally, the
                    rehabilitation should consist of installation of more positive disinfec-
                    tion systems (chlorination) and repairs to the fi lters.

                    Existing Ground Water Supplies

                    The treatment of the existing ground water supplies should be upgraded
                    as described in the report Disinfection of Ground Water Supplies, CH2M-
                    Hill? 1977.- Each of the production wells should be provided with chlori-
                    nation equipment, and in addition, to insure that a chlorine residual
                    is maintained in the Bay Area, a chlorine monitoring station with re-
                    chlorination capabilities should be installed on the system somewhere
                    between Nuuuli and Fagaalu. A suggested possible site is at the Nuuuli
                    booster station which has been programmed to be abandoned.

                    New Ground Water Supplies

                    The recommended new ground water sources at Tafuna and Malaeloa should
                    be disinfected with chlorine at a central point at each site.

                                                    VI-21
<pb n="152" />

                DISTRIBUTION SYSTEM

                General

                As discussed in previous sections, the distribution system is the weak
                link in the existing water system. Residential consumption averaging
                285 gallons per capita per day has been estimated in the existing ser-
                vices. This high consumption is due primarily to leakage and waste
                in unmetered and illegal connections. The excess water consumption
                is such a burden on the existing transmission, pumping and storage
                facilities that the system will not operate  correctly.

                In many areas,* the existing distribution system is a tangle of small dia-
                meter pipelines that branch off of the main transmission pipelines into
                the community. Distribution pipelines wander throughout villages-above
                and underground and it is difficult to determine which lines are metered
                and which are not. Illegal connections are simple to make and difficult
                to police. Repairs to pipelines are sometimes difficult as no rights-
                of-way exist for most distribution pipelines. Residents can insist
                at any time that distribution pipelines be removed from their property
                or prohibit meter readers or repair personnel from  having access to
                their property.   Meters are*placed everywhere, in  and under homes,
                outside on the ground surface and underground. The meters are difficult
                to locate, to read and to repair, and it is sometimes nearly impossible
                to relate a specific meter to any given house.

                The A.S.C. should immediately begin an extensive five to ten year program
                to completely rehabilitate the existingA.S.G. distribution system.
                To be successful, the program needs support from the Governor's office
                and the Legislature ("Fono"). Initially, the program will not be popular.
                If the importance of the program is communicated and results in the

                                                 VI-22
<pb n="153" />

                  form of improved water services are demonstrated, then subsequent efforts
                  will be made easier. Overcoming the initial public resistance will
                  be the first and a major problem faced by-the program. A comprehensive
                  public education and public information program will be required.

                  The completion of the program in the five to ten years projected will
                  require all the resources of the Water System Division and support from
                  the Water, Sewer and Solid Waste Division personnel.

                  REHABILITATION PROGRAM

                  The objectives of the rehabilitation program are as follows:

                       1.   To reduce water waste and misuse

                       2.   To facilitate water system maintenance and repair
                       3.   To reduce operating costs
                       4.   To provide better fire protection
                       5.   To provide equitable water use charges to all water system

                            customers

                       6.   To ensure that all consumers are metered

                       7.   To facilitate meter reading
                       8.   To increase revenues

                  The program outline is shown on Figure VI-1 and is described in more

                  detail as follows:

                       Step 1.   Systematically divide the A.S.G. water system into zones
                       of approximately 50 houses (or any other number that is manageable)
                       that are contiguous and that physically and culturally lend them-
                       selves to water distribution improvements.

                                                  VI-23
<pb n="154" />

                                       ASSESSMENT OF WATER SYSTEMS
                                             AMERICAN SAMOA
                                             FIGURE VI-1
                                         DISTRIBUTION SYSTEM
                                 REHABILITATION PROGRAM OUTLINE
               STEP 1                                                        STEP 11

               SELECT
               DISTRIBUTION                                                  DISCONNECT
               SYSTEM                                                        OLD
               RENEWAL ZONE                                                  SERVICES

               STEP 2                                                        STEP 10
                                                                             RECONNECT
               CONDUCT PUBLIC                                                CUSTOMERS
               HEARING  AND/OR
               VILLAGE  COUNCIL
               .MEETING                                                      STEP 9

                                                                             REQUEST
               STEP 3                                                        REAPPLICATIONS
                                                                             FOR WATER
               PREPARE                                                       SERVICE
               PRELIMINARY
               ENGINEERING
               PLAN                                                          STEP 8

                                                                             DESIGN AND
               STEP 4                                                        CONSTRUCT
                                                                             NEW
               CONDUCT                                                       DISTRIBUTION
               PUBLIC                                                        SYSTEM
               HEARING

               STEP S

               MODIFY
               ENGINEERING
               PLAN

               STEP 6                         NO               STEP 7
               REQUEST
               APPROVAL        NO      is THIS THE     YES     CONDEMN
               FOR RIGHT-              THIRD PLAN              RIGHT-
               OF-WAY                  MODIFICATION?           OF-WAY
                      TYES

                                                    VI-24
<pb n="155" />

                         Step 2.   Conduct a public hearing and/or a village council meeting
                         to present the distribution system   rehabilitation program and its
                         objectives, request community support, discuss the water service
                         agreement form and obtain community input.
                         Step 3.   Prepare a preliminary engineering plan for the Water
                         Distribution improvements in the zone. The preliminary plan would
                         attempt to provide water service to the zone through existing
                         A.S.G. easements or recognized public rights-of-way that can be
                         converted to pipeline easements.

                         The preliminary plan would provide fire protection to the zone
                         by maintaining a minimum 6-inch diameter pipeline size and pro-
                         viding adequately spaced fire hydrants. The preliminary plan would
                         provide for right-of-way for all A.S.G. maintained water system
                         facilities for repair and meter reading.
                         Step 4.   Conduct a public hearing to present the preliminary
                         engineering plan to the residents of the zone and to hear criti-
                         cisms and suggestions for the proposed plan.
                         Step 5.   Modify the plan as required and as practicable to reflect
                         public comments.
                         Step 6.   Conduct up to two additional public hearings to present
                         the revised preliminary plan to collect and include public sugges-
                         tions and request right-of-way for the improvement facilities.
                         Step 7.   If right-of-way has not been negotiated at the end of
                         a designated period (60 days after last public hearing) proceed
                         with condemnation for the pipeline right-of-way.
                         Step 8.   When proper right-of-way has been obtained, construct
                         new distribution pipeline.
                         Step 9.   Request that all residents (existing and new customers)
                         who wish to obtain water service apply at the Department of Public

                         Works.

                                                     VI-25
<pb n="156" />

                        Step 10. Connect the services to the new main pipeline. All new
                        meters shall be within the right-of-way and as close to the main
                        pipeline as possible. The new meters shall be installed with
                        sufficient fittings to prevent backflow and to allow quick removal
                        of the meter for repair or for discontinuance of service.

                        Meters would be installed within a meter box to protect them from
                        damage or vandalism.

                        When reconnecting existing customers, adequate service pipe of
                        proper size would be provided by the A.S.G. so that service will
                        reach the point of the original service meter or the residence.
                        It will be the responsibility of the customer to obtain right-
                        of-way for his service lateral.

                        Service to all new customers shall be at the nearest distribution

                        main.

                        Step 11. Disconnect all the old existing service connections from

                        the main pipeline.

                        Step 12. Continue with next zone.

                   VILLAGE WATER SYSTEMS

                   General

                   Within the constraints of Public Health Requirements (See Malae, 1976),
                   most individual villages or individuals will be free to either request
                   water service from the A.S.G. system or to develop and operate their
                   own water systems. The choices opened to the villages are illustrated
                   in Decision Diagram (Figure VI-2).

                                                    VI-26
<pb n="157" />

                                      ASSESSMENT OF WATER SYSTEMS
                                            AMERICAN SAMOA
                                            FIGURE V1-2
                             VILLAGE WATER SYSTEM DECISION DIAGRAM

                            GOVERNMENT               YES              REQUEST
                            OPERATED INTRA                             GOVERNMENTAL
                            VILLAGE SYSTEM?                            ASSISTANCE

                                    NO

                            VILLAGE OPERATED          No          SMALL INDIVIDUAL
                            INTERVILLAGE
                            SYSTEM?                               FAMILY SYSTEMS

                                    YES

                            DOES VILLAGE HAVE
                    NO      ADEQUATE MANAGERIAL
                            TECHNICAL AND FINAN-
                            CIAL CAPABILITIES?

                                    YES

                            ARE ADEQUATE QUANTITIES                         DEVELOP
                            OF SURFACE WATER AVAIL-          YES            SURFACE
                            ABLE THAT WILL MEET                      ------- WATER
                            MINIMUM QUANTITY                                SYSTEM
                         .,STANDAR S?

                                    NO

                                                                            DEVELOP

                            ARE ADEQUATE QUANTITIES           YES        al. GROUND
                            OF GROUND WATER AVAILABLE?l                     WATER
                                                                            SYSTEM

                                    NO

                            IS ADEQUATE LAND AREA                      DEVELOP
                            SUITABLE FOR A RAIN            YES         RAIN CATCH-
                            CATCHMENT SYSTEM                           MENT SYSTEM
                            AVAILABLE?

                                    NO

                                                    VI-27
<pb n="158" />

                   If there is a choice and if the villages wish to remain independent
                   from the A.S.G water system and feel that they have the managerial,
                   technical, and financial resources required to properly operate a'water
                   system within existing federal law, they should investigate the water
                   resources within the village. On the basis that the source that is
                   least expensive to develop is the source that should be investigated
                   first - surface water, ground water and rainshed catchment systems
                   should be investigated in that respective order.

                   If none of these sources are viable, then the village should look again
                   at the A.S.G. system, at individual home roof catchment systems, or
                   other individual systems.

                   Whenever the A.S.G. participates in the development or improvement of
                   a water system within an isolated village or villages, the village(s)
                   should be given the option of operating and maintaining that system.
                   The village should understand that it will assume all responsibilities
                   for the operations including financial and legal obligations.

                   The most important legal obligation at this time is PL 93-523. This
                   law applies to all public water supplies having at least 15 service
                   connections or serving 25 or more people. The law requires that tests
                   be regularly conducted to determine if the water supply complies with
                   the minimum requirements. Public notice must be given of any failure
                   to meet standards. The Environmental Protection Agency, the Territory,
                   or private citizens may take legal action against any village believed
                   to be in violation of the act. Copies of the Act, together with a written
                   summary in both Samoan and English, should be given to villages operating
                   systems.

                   All operational and maintenance expenses should be borne by the village.
                   It is highly inconsistent and unfair for consumers on the A.S.G. water

                                                   VI-28
<pb n="159" />

                  system to be charged for water while villages receive free water and
                  free water system repair service. The baiis and reasoning for charging
                  for water service is that the A.S.G. will then operate and maintain
                  the water system.

                  Experience with developing village water systems in many countries
                  (World Bank 1976 and Civil Engineering 1978) indicates that it is highly
                  desirable that the village be involved in the entire system planning
                  process and the village contributes toward the improvements. Most
                  villages in American Samoa want to contribute labor rather than finan-

                  cial support.

                  The contribution of labor is an acceptable alternate, but it creates
                  several construction management problems. The volunteer labor tends
                  to be very unskilled and unreliable. Dollarwise, the unskilled labor
                  portion of the projects is very small and it is usually quicker and
                  cheaper to employ skilled labor.

                  Involving the village in decision-making roles and not just as laborers
                  is more important to the success of the project. By being involved
                  in the decisions, the village is, to a large extent, responsible for
                  the success of the system and will be willing to be responsible for
                  the continued maintenance and repair of the systems.

                  The initiative for undertaking improvements to the village system should
                  come from the village itself. A representative from the Development
                  Planning Office or the Department of Public Works should be available
                  to the village for help in organization, as a liaison in dealing with
                  various A.S.G. agencies and for technical assistance with the system
                  design. If it has not done so, the village should be encouraged to
                  form a Water Committee that would be responsible for coordinating the
                  village decision process, collection of required funds, coordination
                  of the construction process, and ultimate management of the water system
                  operation.

                                                   VI-29
<pb n="160" />

                   The village should be required to pay a part of the construction costs,
                   not because the funds are necessary to complete the water system, but
                   because the contribution of funds is part of the participation process.
                   The collection of funds for the construction of churches or other village
                   projects is very much a part of the culture and life style of small
                   villages and if encouraged, could be applied to water system improve-

                   ments.

                   Water Consumption

                   One of the first steps in the design of a water system is the determina-
                   tion of water demands. The water demands of a village-type community
                   in a developing area are dependent to a great extent upon the type of
                   waste disposal system to be utilized.

                   The common industrialized society's solution to waste disposal is through
                   the use of waterborne sewage transport. This involves dilution of the
                   waste with potable water. The resulting sewage, mostly water, is flushed
                   through a system of subterranean pipes and pumping stations to one dis-
                   charge point. Because direct discharge of large volumes of waste is
                   detrimental to the receiving water, the objective then becomes one of
                   repurifying the water and reconcentrating the waste. The dilution-recon-
                   centration process makes little sense economically or in terms of resource
                   conservation. Flush toilets for water transport of wastes utilize the
                   majority of water consumed in a residential structure.

                   A.S.G. planning should investigate alternate waste disposal technologies
                   to determine if some other system would be acceptable to the community
                   without the utilization of large quantities of potable water and the
                   high cost of sewerage.

                                                   VI-30
<pb n="161" />

                 Surface Water

                 The vast majority of villages currently use surface water streams or
                 springs for their source of water supply. Surface waters are the easiest
                 and cheapest to develop and are the first to be developed. There are
                 several problems that must be addressed when utilizing surface waters.

                 The quantity of flow varies with each season. The short, steep streams
                 of American Samoa have a very rapid runoff, and as the 1971 and 1974
                 dry season demonstrated, base flows rapidly diminish after several weeks
                 without rain. The narrow, steep watersheds also make it difficult,
                 if not economically impossible, to construct dams that can contain
                 sufficient water to carry over through a long dry season. A surface
                 water source is only as good as its low flow unless a substantial volume
                 of water is stored for use during the low flows encountered during the
                 dry season.

                 The high intensity rains of American Samoa wash sediment and debris

                 into the streams that must be removed from the water. Current federal

                 regulations have very high standards for water quality. To meet these
                 standards most surface water sources would, as a minimum, require sedi-
                 mentation, filtration and disinfection treatment processes. These
                 processes are expensive to build and difficult to maintain. To be
                 bacterially safe, the watersheds above a stream intake should be set
                 aside to nearly a natural state. All access to the watershed should
                 be controlled. This is a very difficult problem in American Samoa where
                 land is scarce and villagers traditionally raise their own crops on
                 the lands above the villages.

                                                   VI-31
<pb n="162" />

                   Ground Water Wells

                   Ground water typically offers the best possibility of a high quality
                   water with minimum treatment and storage requirements. The quality
                   and quantity of ground water normally remains relatively constant over
                   time. Barring mechanical problems, once a well is drilled and success-
                   fully tested, it can be expected to be a reliable source of water for
                   many years. Chlorination would normally be the only recommended treat-
                   ment requirement.

                   The main problem with ground water wells is that they require a pump
                   and motor which require maintenance and operation effort and expenses.
                   Past experience with wells in villages has not been good. The equipment
                   is not maintained and sooner or later breaks down, leaving the village
                   without water. A backup well and pump should always be provided.

                   The drilling of wells requires an expenditure of funds and is not always
                   successful. Because of this and a lack of understanding of ground

                   water, the community does not generally support wells as a water source.
                   A public education program could do much to relieve many of the misunder_
                   standings. Exploratory well drilling programs along the narrow coastal
                   plain in which the majority of villages are located have indicated that
                   the quantity of ground water is limited. The alluvial fills are highly
                   weathered and have limited quantities of developable water. However,
                   most villages have some potential for ground water that should be inves-
                   tigated. The A.S.G. test well drilling program is scheduled to inventory
                   the ground water of most villages that are currently outside of the
                   A.S.G. water system. This information would aid the villages in master
                   planning their water system objectives.

                                                   VI-32
<pb n="163" />

                  Village Rainshed Catchment, Systems

                  Certain villages which lack both surface and ground water supplies could
                  develop a village-wide rainshed system  to provide water. Typically,
                  this system consists of a large impervious area to collect rain and

                  storage facilities to contain rainfall runoff for drier periods. These
                  systems can provide high quality water with simple slow sand filtration

                  and chlorination.

                  The village-wide rainshed systems require a relatively large capital
                  investment that is far beyond the capabilities of a village and would
                  probably have to be developed and operated with assistance from the

                  A.S.G.

                  Because of the high development costs, the design of these systems
                  assumes strict control over water usage to prevent waste. The attached
                  schematic designs and preliminary cost estimates for two villages
                  (Aoloaufou and Fitiuta) give some idea of the size and cost of these
                  systems (Figures VI-3, VI-4, VI-5 and VI-6). Aunuu village also has
                  characteristics that would make a rainshed catchment system attractive.
                  The Aunuu system could be designed to mix the high quality rainshed
                  water with the high chloride ground water presently utilized in Aunuu
                  Village.

                  The primary disadvantages of rainshed systems are their relatively high
                  development costs and the fact that the catchment structure and storage
                  facilities can not be economically constructed large enough to supply
                  water through all rainfall probabilities. An economic decision would
                  be made to size the system to provide design water demands in eight
                  out of ten cases, nine out of ten cases, or some other frequency.
                  Shortages during low rainfall years would@be met by alternate sources
                  and/or strict rationing.

                                                     VI-33
<pb n="164" />

                                                                                       oz@
           0,

                                                                                             10,
                                                         -led

             /a

                                                                 Fl
     --@F NISH        ER
        STORAGE-__TANK--@.
       -,fI ATI-QN Bv-,-                                                      'a
       C 0 MTIG
          5    0 A     AW
              R   OW  G

                                             'POO
                             obb          43
                             41
                11170
                                                             ASSESSMENT  OF WATER SYSTEMS AM

                                                                     SCHEMATIC RAINSHED W
                                          alto                                 - FITIUTA VILL
                                      700                             SYSTEM
        0                                                         U.S. ARMY ENGINEER DISTRICT9
        do                                                                    OAHU . HAWAII

                                                                                        FIGURE
                                                                                    Im IN!
<pb n="165" />

                                        ASSESSMENT OF WATER SYSTEMS
                                              AMERICAN SAMOA
                                              FIGURE VI-4
                                          PRELIMINARY DESIGN
                                    FITIUTA VILLAGE WATER SYSTEM

                   1. POPULATION

                          YEAR                  POPULATION
                          1974                      441
                          2000                      502*
                          *0.5% increase per year

                   2. WATER CONSUMPTION

                          ASSUMPTIONS:

                            1.  No industrial or commercial use
                            2.  50 gallons per capita per day consumption
                            3.  Strict controls (meters) over water use
                            4.  Government operated system
                                  502 people x 50 gallons/day x 365 days     9,161,500 gallons
                            5.  Mix in 2,500 gallons per day from
                                  existing brackish well
                                  2,500 gallons/day x 365 days                 912,500 gallons
                                  Gallons required from catchment            8,249,000 gallons

                   3. REQUIRED CATCHMENT AREA
                          Assume 110 inches rain/year (90% probability rainfall)
                          8,249,000 gallons/year x 12 inches/foot - 120,306 square feet
                          7.48 gallons/cu. ft. x 110 inches/year

                   4. STORAGE SIZING
                          (per mass storage calculations)
                          625,000 gallon storage reservoir required

                   5. COST ESTIMATE
                            1. Storage tank (625,000 gallon)                         = $175,000
                            2.  Rubber lined catchment (120,306 sq. ft. @ $1.50)     =   180,500
                            3. Treatment &amp; miscellaneous                                  75,000
                                                   Subtotal                          = $430,500
                                                   Contingencies 15%                 =    65,000
                                                   TOTAL                             = $495,500
                                                   SAY                               = $500,000

                                                       VI-35
<pb n="166" />

        0

       10

      20

    w
    0,30
    z                                                            oeq
    w
    X40
    D
    050                                                   d
    u-
    060
                                                      001-
  aN  70
                                                 J
    HE
    M80
    0
    ir
    0-90                                   E

      100
       70        80      90        100     110       120      130      140
                                 ANNUAL RAINFALL (inches)

                                     ASSESSMENT OF WATER SYSTEMS

                                          AMERICAN SAMOA
                                          FIGURE VI-5
                              RAINFALL PROBABILITY AT TAFUNA AIRPORT
                            M m m m m = m
<pb n="167" />

                                                                                    1275

                                   so
                                                                                         ----S-PALS@      2

                                                     13
                                                                                                           i4l

                                                                                1400
                                                                               FINISH                 STORAGE
                                                                                         142.5
                                                                               FILTRATION a CHLOR
                                                                                        1450
                                           M,      AW                                 1475
                                                S ORA                                       1500
                                                                                           15? 5
                                         /I -5a                                   11 00         T
                                                                                    AIN ATC.          N
                                                                                    L '4

                     LOAvA
                  CRATE

                                                 ASSESSMENT OF WATER SYSTSMS9 AMERICAN SAMOA

                                                             SCHEMATIC RAINSHED WATER
                                                            SYSTEM.- AOLOAUFOU VILLAGE

                                                        U.S. ARMY ENGINEER DISTRICT, HONOLULU
                                                                         OAHU I HAWAII
                                                                                     FIGURE Vl- 6        PagelZI-37
<pb n="168" />

                                          ASSESSMENT OF WATER SYSTEMS
                                                 AMERICAN SAMOA
                                                FIGURE VI-7
                                            PRELIMINARY DESIGN
                                    AOLOAUFOU VILLAGE WATER SYSTEM

               1. POPULATION

                      YEAR                        POPULATION
                      1974                           410
                      2000                          1137*
                      *4% increase per year

               2. WATER CONSUMPTION

                      ASSUMPTIONS:

                        1.  No industrial or commercial use

                        2.  Strict controls (meters) over water consumption
                        3.  Government operated system
                        4.  75 gallons per capita per day consumption
                        5.  Existing spring average flow 40 gpm,
                              1137 people x 75 gallons per day x 365 days = 31,125,400 gallons
                              Less 40 gallons/minute x 1440 minutes/day
                                  x 365 days                                   = 21,024,000 gallons
                              Gallons required from catchment                  = 10,101,400 gallons

               3. REQUIRED CATCHbIENT AREA
                      Assume 140 inches/year rainfall as per Faga'alu rain     station (90% rainfall
                        probability)
                      10,101,400 gallons/year x 12 inches/foot =      115,753  square feet
                      7.48 gallons/cu. ft. x 140 inches/year

               4. STORAGE SIZING
                      (per mass storage calculations)
                         2.00 million gallon storage reservoir required

               5. CATCHMENT SYSTEM COST ESTIMATE
                        1. Storage tank (2.0 M.G.)                                 $550,000
                            Rubber lined catchment (1.50/sq. ft.)                   174,000
                        3. Treatment &amp; miscellaneous                                 75,000
                                                          Subtotal                  799,000
                                                          Contingencies 15%    =    120,000
                                                          TOTAL                =   $919,000
                                                          SAY                  =   $925,000

                                                       VI-38
<pb n="169" />

                    0

                    10

                  20

               z
               w  30
               w                                     -L. Z
               D
               040

                  50
               u-
               0
               &gt;- 60

               Co 70
               &lt;                         4+
               Co
               0  80
               Cr
               CL 90

                   100
                     100                        200                          300
                                                    ANNUAL RAINFALL (inches)

                                             ASSESSMENT OF WATER SYSTEMS

                                                  AMERICAN SAMOA

                                                  FIGURE VI-8
                                    RAIWALL PROBABILITY AT UPPER FAGAALU RESERVOIR
<pb n="170" />

                   Individual Roof Catchment Systems

                   Many homes presently utilize runoff from roofs for water supply pur-
                   poses. Except for a very few, these systems are primitive and runoff
                   is only collected in barrels and buckets from roof downspouts.

                   A few homes have more advanced systems with adequately sized gutters,
                   storage tanks, and pressurization systems. Some of these systems have
                   proved to be successful in the relatively evenly distributed annual

                   rainfall of American Samoa.

                   Calculations for a typical system in American Samoa in an area with
                   100 inches of rainfall per year and an allowance for only 50 gallons
                   of water per person per day indicate that the individual roof catchment
                   system would require 300 square feet of roof area and 1500 gallons of
                   storage capacity per person in the household. Reservoir storage capa-
                   city was determined by mass storage calculations which assumes that
                   storage will be depleted coincidentally with the first rains of the

                   wet season.

                   A consumption rate of 50 gallons per person per day is low by most
                   standards. There have been no studies on the actual consumption rates
                   in American Samoa, and it is possible that through strict control of
                   water usage, the head of a household could reduce water consumption
                   to a lower rate. Perhaps a demonstration project could be developed
                   that would provide more information on water consumption.

                   With a consumption rate of 50 gallons per person per day, the typical
                   U.S. household of 3.5 persons would require a storage capacity of some
                   5,000 gallons and a roof area of slightly over 1000 square feet. Samoan
                   households average 7.4 persons per household (see 1977 annual report)

                                                    VI-40
<pb n="171" />

                   and would require facilities over twice as large. A typical Samoan
                   residence has far less than the required 2200 square feet of roof area
                   and would require special additions for the extra catchment area. .

                   Roof catchment systems can be of several types. To eliminate the need
                   for pumping to pressurize the system, a catchment roof and storage tank
                   can be constructed as a separate structure from the residence. The
                   structure will have to be elevated above the residence by either build-
                   ing an elevated structure or by siting the structure on elevated ground.
                   In this system, the size of the catchment area is usually limited by
                   economics to an area roughly equal to the size of the tank roof. The
                   system, therefore, can not be relied upon for continual supply and
                   requires a backup source. The backup source can be either a village
                   or the A.S.G. system. The backup system, however, may be experiencing
                   the same water shortages during low rainfall periods.

                   The separate structure system could be constructed in American Samoa
                   using locally available materials (galvanized iron roof catchment and
                   5000 gallon ferrocement tank) and skills for less than $1,000.

                   A catchment system that utilizes the roof area of the residence could
                   also be easily constructed (Figure VI-9). The roofs should be of galva-
                   nized iron or some other nonorganic material that does not impart a
                   taste or color to the water as do wood shingles or composition roofing.
                   The roofs of existing homes are sometimes difficult to incorporate into
                   a roof catchment system because of the materials used for construction
                   or because their layout makes collection of all runoff difficult. How-
                   ever, new home roofs can easily be planned for efficient collection.

                   The roof catchment system requires a pump and pressure tank if adequate
                   pressures are to be maintained in the residence. The pump increases
                   the maintenance requirements and reduces reliability. A pumped syjtem

                   would cost approximately $1500 in American Samoa.

                                                   VI-41
<pb n="172" />

                                                            METAL ROOF

                                        GUTTER

                                  SCREEN

                                                v

                               PREFILTER              WATER STORAGE
                               SETTLING TANK
                                                         TANK

                        SAND
                        FILTER

                                                                 HOUSEHOLD
                      PUMP a                                     USE
                      PRESSURE
                      TANK

                         OPTIONAL BACKUP SUPPLY

                                  ASSESSMENT OF WATER SYSTEMS ',.AMERICAN SAMOA

                                           ROOF CATCHMENT SYSTEM

                                       U.S. ARMY ENGINEER DISTRICT, HONOLULU
                                                   OAHU, HAWAII
                                                           FIGURE W-9   PageZ-42
<pb n="173" />

                    Any roof catchment system will experience shortages at one time or
                    another because it is impossible to construct a system large enough
                    to cover all rainfall probabilities. With proper management of water,
                    though, the shortages can be reduced to a minimum.

                    RIGHT-OF-WAY ACQUISITION

                    General

                    The procurement of right-of-way for construction of improvement programs
                    has historically been the source of problems and delays for the American
                    Samoa Government. The difficulties can be traced directly to adminis-
                    trative problems, a lack of policy guidelines, and the unique Samoan
                    communal land ownership arrangement. The problem also relates to the

                    reluctance of the A.S.G. to take a firm stand on the issue because of

                    a fear that it may be violating the nonalienation of native lands policy.
                    The A.S.G. also feels that a firm stand may not be popular in the small
                    island community. The avoidance of confronting right-of-way issues
                    and the urgent need for water system improvements have sometimes caused
                    projects to be modified at the expense of higher construction costs
                    or operational efficiency.

                    The difficulty in obtaining right-of-way can also be viewed as a measure
                    of the public's lack of knowledge concerning the A.S.G. water program.
                    This unawareness of A.S.G. improvement programs in turn leads to apathy
                    and nonsupport of the programs. The present policies do not stress
                    public involvement, and this is exemplified by the tradition of making
                    public contact for the first time only when attempting to obtain right-
                    of-way for projects. An individual who is not informed about proposed
                    plans and objectives of the improvement programs will have little con-
                    fidence in the programs and little sense of community duty to cooperate
                    in providing right-of-way.

                                                     VI-43
<pb n="174" />

           Recommended Policy and Procedures

           After a review of the problem areas within the Right-of-Way
           Branch of the Department of Public Works, the following revisions
           to the present system are recommended:

                 1.  The American Samoa Government should adopt a policy to
                     expedite right-of-way acquisition by instituting condemna-
                     tion proceedings under the public domain authority
                     vested in the A.S.G. when an agreement is not reached by
                     negotiation with the landowner within a reasonable time.

                 2.  Establish a Right-of-Way Branch in the Department of Public
                     Works staffed by engineers, surveyors, draftsmen, right-
                     of-way men, trained appraisers, lawyers, and other personnel
                     required for efficient and prompt right-of-way acquisitions.
                     Whenever necessary, long"term (five year) contracts of employ-
                     ment could be made with skilled personnel to maintain conti-
                     nuity in the Right-of-Way Branch.

                3.   Arrange public hearings in cooperation with the Office of
                     Samoan Affairs before a final selection is made of the right-
                     of-way route in the village or villages affected. The
                     public hearings will identify the landowners, problems with
                     the selected route, and problems in obtaining land values
                     and lease rentals in the area by the appraisers.

                4.   In the negotiation stage, the American Samoa Government
                     should initially make an offer to purchase the property from
                     the landowner. If an agreement is not reached, the A.S.G.
                     should have appraisers investigate the property and make an
                     official,appraisal of its market value. The landowner would
                     then be given an official notice that states the property
                     is to be taken, given a description of the property, and se ts
                     forth the amount the A.S.G. will pay. If the amount is accep-
                     table to the owner, the purchase of the property will.be

                                             VI-44
<pb n="175" />

                          secured by an agreement between the A.S.G. and the owner.
                          If the amount is acceptable, but there is a dispute as to
                          the ownership of the land, all parties claiming ownership
                          should execute a release. A writ of interpleader would be
                          filed by depositing the agreed upon amount with the High
                          Court and the Court would determine ownership for the pur-
                          pose of distribution of the amount deposited with the
                          Court Registry. If an agreement cannot be reached, then
                          condemnation proceedings should be instituted immediately.

                          Abolish the crop damage schedule of payments system and.
                          make payments pursuant to the fair market value of the
                          land by the official appraisers. A landowner refusing to
                          accept the official appraisal value may seek to prove by
                          competent evidence that the compensation is inadequate for
                          past., present, and prospective loss to the property not taken
                          a5-a measure of compensation. The owner may also show the
                          special adaptability or availability of the land for its
                          highest and best use as a measure of increasing the com-
                          pensation. It should be noted that as long as the taking
                          is for the public use, the only matter remaining would be
                          the award of just compensation to the landowner.

                     6.   The Right-of-Way Branch budget should be set for a longer
                          term (three years) to allow a review of right-of-way acqui-
                          sitions during that period and estimate the-budgetary needs
                          of the Right-of-Way Branch. The Budget would have to be
                          audited on an annual basis to determine whether or not a
                          special appropriation will be necessary to meet the right-
                          of-way acquisitions that exceed the estimated cost for
                          particular projects or for new projects that were not a part
                          of the original budget consideration. Advance payments for
                          monthly or annual rentals for right-of-way acquisitions or
                          leases should be discouraged and be subject to approval
                          by the budget officer for the Right-of-Way Branch.

                                                       vi-45
<pb n="176" />

                7.   Enact legislation to authorize the Right-of-Way
                     Branch to enter land for the purpose of making
                     preliminary surveys and plans prior to the commence-
                     ment of proceedings to acquire land for public use.
                     After determination of ownership, record surveys of
                     right-of-way acquisitions that describe ownership and boundary
                     lines in the Office of the Territorial Registrar. This will
                     provide.a record of land ownership and boundary definitions
                     whenever the A.S.G. takes land for public use under a
                     right-of-way acquisition.

                8.   The Office of the Territorial Registrar should adopt in-
                     dexing systems that will increase the efficiency of
                     retrieving land sale records, leases, easements, condemnation
                     and right-of-way acquisitions. The American Samoa Govern-
                     ment should assist the collection of statistics on written
                     lease agreements that are not recorded with the Territorial
                     Registrar or informal oral lease rent agreements bytaking a
                     survey of commercial and residential rentals in the Territory
                     of American Samoa and making the information available to the
                     Right-of-Way Branch.

                9.   Enact legislation to require the mandatory posting of a bond
                     or surety to secure temporary restraining orders seeking to
                     restrain right-of-way acquisitions.

           Cultural Considerations

           The cultural aspects to be considered in condemnation and right-of-way
           acquisitions would involve the direct infringement on the Samoan concept
           of their inalienable rights to the land. The A.S.G., past and present,
           had zealously supported the policy to protect Samoan lands. Since
           1961, the A.S.G. policy has been to encourage negotiations for right-
           of-way acquisitions and not to use condemnation proceedings. This
           policy may have contributed to many of the problems described in Chapter V.

                                              VI-46
<pb n="177" />

                   The villages of Fagatogo and Pago Pago represent a unique problem that
                   is not completely cultural, but it still presents a major obstacle to
                   any right-of-way acquisition for waterlines and monitoring water use
                   by meters in these villages. The villages rely on an agreement between
                   Commander Benjamin F. Tilley, U.S. Navy, and the Chief of Fagatogo and
                   the Chief of Pago Pago, dated August 23, 1899. In the agreement, the
                   Navy agreed to "two pipe hydrants for the public use in the village
                   of Fagatogoll in exchange for "three hundred dollars and the exclusive
                   right to construct and maintain a reservoir, pipeline, and all necessary
                   connections and fittings". Many residents in these villages have inter-
                   preted the agreement to mean that they have a right to free water from
                   the A.S.G. water system ("public hydrant") and are reluctant to sur-
                   render this assumed privilege. The 1899 Tilley agreement may be con-
                   sidered a treaty with the United States entered into prior to the Deed
                   of Cession in 1900 which would raise a legal question. To be effective
                   a treaty must be adopted by the President of the United States and
                   approved by two-thirds of the United States Senators present at the
                   time of approval.

                   The primary cultural objection that would be raised in every right-of-
                   way acquisition is the erosion of the Samoan way of life (11fala Samoa").
                   Every taking of land for public use, directly affects the authority
                   ("Pule") of the chief (I'mataill) over land that he exercises control
                   over for his extended family. The Pago Pago Well Condemnation, Airport
                   Acquisition, and Dairy Farm cases, however, demonstrate that condemna-
                   tion proceedings can be effectively instituted without seriously affect-
                   ing the Samoan culture.

                                                     VI-47
<pb n="178" />

                 WATER SYSTEMS MANAGEMENT

                 General

                 Over the short-term, the attention that is now being given to the pro-
                 blems of operation and management of the water system and the coordina-
                 tion with planning functions appears to be a great improvement over past
                 efforts. The development of programs to meet the goals and objectives
                 of the water utility branch are underway and should receive priority
                 attention within WSSW. Outlining these programs and disseminating the
                 information to various departments of the Government of American Samoa
                 would do much to strengthen the understanding of the operational consi-
                 derations of WSSW in the planning efforts and would define the role of
                 government in water systems development. In addition, weekly staff
                 meetings between the Water Systems Division and Water Utilities would
                 increase coordinatation between the design and operation professionals.

                 The policy and operational procedures in regards to government interven-

                 tion in village water systems should be formalized prior to increased
                 government expenditures on the village systems. Because of consistently
                 expressed village sentiment towards maintaining traditional ownership of
                 the water use rights, the DPW goal of owning and operating all water
                 systems and charging customers appears ill-fated. It is recommended
                 that A.S.G. acknowledge village ownership and operation of water systems
                 and only provide services on a work order basis, charging for services
                 rendered. In situations where the Governor determines aid is desirable,
                 he allocates money from a small descretionary fund, called the Small
                 Village Fund. This aid should not be channelled through Water Utility,
                 but through another DPW division. This will reduce public confusion as
                 to the role of Water Utility in operating A.S.G.'systems. To accom-
                 modate A.S.G. facility requirements, the government should either
                 develop separate water supplies for government facilities served by

                                                   VI-48
<pb n="179" />

                village systems, or purchase water from the village systems at the same
                rate for which A.S.G.. charges for government supplied water@. This
                approach will not only minimize conflicts, but absolve A.S.G. of many
                operational responsibilities for village water systems under the Safe
                Drinking Water Act.

                Long-Term Recommendations
                Management will receive additional government-wide emphasis through
                increased budgeting in the fiscal years following FY79. However, a
                reorganization of the DPW functions dealing with water systems design,
                construction, maintenance, and operation to take advantage of existing
                professional talent and to improve coordination, appears desirable. A
                Water Division could be formed within the Department of Public Works,
                which would combine planning, design, construction, operation, and main-
                tenance of all water systems under one Assistant Director of DPW. A
                atrong manager with experience in managing multidisciplined organiza-
                tions would be required. A recommended organization chart for such a
                Division appears as Figure VI-10. This organization would provide
                increased engineering expertise for operational decisions without dupli-
                cating engineering or support staff efforts in separate design and oper-
                ation divisions. Additionally, the organization will facilitate in-
                creased emphasis on upgrading the distribution system. The additional
                function of needs assessment was added to form a basis for future plan-
                ning. Locating all members of the Division in one specific area, and
                holding weekly staff seminars to discuss plans and operational problems
                would also increase the coordination of objectives and provide the bene-
                fits of additional exchange of technical information. The existing
                in-service training program should be expanded to include all levels of
                management, as well as field personnel and the topics expanded to
                include billing and other management considerations.

                                                    VI-49
<pb n="180" />

                                                                        ASSESSMENT OF WATER SYSTEMS

                                                                                 AMERICAN SAMOA

                                                                                    FIGURE VI-10

                                                                                 ORGANIZATION CHART

                                                                               PROPOSED WATER DIVISION

                                                                           DIRECTOR OF PUBLIC WORKS

         i-n                                                                  ASSISTANT DIRECTOR,
                                                                         WATER DIVISION ADMINISTRATION

                                          PLANNING AND BUDGETING BRANCH                                    OPERATIONS AND MAINTENANCE BRANCH]
                                          PLANNI:G:                                                        DiSTR18UTION
                                            NEE0  ASSESSMENT                                               TREATMENT
                                            COSTING AND BUDGETING                                          METERING AND CONNECTIONS
                                          DESIGN:                                                          EouiPMENT
                                            TRANSMISSION AND DISTRIBUTION                                  BILLING AND COLLECTION
                                            GROUNDWATER
                                            SURFACE WATER
                                                                    '
                                                                              A    STAN :D:REC
                                                                               SS'  IS: T I
                                                                         WATER
                                                                             D31 V    '0 :N:ADMN
                                                                    ,A.H

                                                                m
<pb n="181" />

                 With the accelerated construction of water improvements in American
                 Samoa, management and operation requirements have increased dramatically
                 over the past 5 years, and will continue. The burden of compensating
                 for past operational neglect and the operation of this new and rela-
                 tively sophisticated utility system will result in significant demands
                 on management and indicates that bold and forceful changes will be
                 required to correct existing deficiencies and meet the new tasks ahead.
                 Additional repair crews and equipment, meter installation and meter
                 reading crews, mid-level managers, and engineering expertise will be
                 required if the benefits of the new transmission and source development
                 programs are to be extended to the people and if the government is to
                 operate and maintain planned improvements in the best long-term interest
                 of the territory.

                 Another longer range alternative is the formation of a separate author-
                 ity such as a Board of Water Supply, and which the formation of a sepa-
                 rate Division would be an excellent first step. The Board would pre-
                 sumably have all of the functions of the previously mentioned Division
                 and would operate independently of the Government. This would require
                 development of separate billing, procurement, and other administrative
                 functions. This additional overhead expense does not now appear war-
                 ranted for the marginal benefits of bypassing political pressure and
                 cumbersome governmental regulations regarding personnel and procurement
                 procedures. A Board of Water Supply concept should be considered as the
                 system size and functions increase.

                 Long-term planning and policy direction from the highest level of terri-
                 torial government also needs to be developed. Such items as the philos-
                 ophy of continual subsidy of the water system or the possibility of
                 system revenue meeting all (or a fixed percentage) of operating costs
                 need to be addressed in the form of governmental policy. The goals of

                                                  VI-51
<pb n="182" />

                 expansion of the system and of increased water quality also require
                 attention. One recommended step, in development of the policy, is to
                 require completion of the Government of American Samoa Operations
                 Manual. This manual, required under the code of American Samoa, is the
                 responsibility of the Lt. Governor. Policy and operational procedures
                 contained in the manual would be a basis for action on the department

                 level.

                 To reduce public suspicion and distrust of water system management, an
                 ongoing public awareness program should be incorporated into WSSW acti-
                 vities. The program should include both formal and informal public
                 hearings, and weekly television news coverage of system changes. Dis-
                 semination of information on how the system operates and the problems
                 encountered by DPW would be of value. Announcing failures and successes
                 in solving difficult problems will also do much to narrow the gap be-
                 tween public expectations and DPW capabilities. This mutual understand-
                 ing will do much to improve water system management, from which the
                 people of the territory will ultimately benefit.

                                                  VI-52
<pb n="183" />

                     LIST OF REFERENCES

 I -
<pb n="184" />

                                      ASSESSMENT OF WATER SYSTEMS

                                            AMERICAN SAMOA

                                        LIST OF REFERENCES

             1.  Alalilima, Vaiao J. and Fay C., Samoan Values and Economic Development.

             2.  Austin, Smith &amp; Associates, Inc., 'Report Covering a Master Planned
                 Water Supply and Distribution System for the Pago Pago and Tafuna Areas,
                 prepared for the Government of American Samoa, February 1963.

             3.  Austin, Smith &amp; Associates, Inc., Report Updating the 1963 Master Planned
                 Water Supply and Distribution System for the Pago Pago and Tafuna Areas
                 and Including the Leone Plain, prepared for the Department of Public
                 Works, Government of American Samoa, April 1972.

             4.  Austin, Smith and Associates, Inc., Water Supply and Distribution
                 Systems Pago Pago and Tafuna Areas, April 1966.

             S.  Bentley, C. B., Ground Water Resources of American Samoa with Emphasis
                 on the Tafuna-Leone Plain Tutuila Island, USGS Water Resources
                 Investigation"Report No. 29-75, 1975.

             6.  CH2M Hill, Water System Study: Western Portion of Tutuila Island,
                 prepared for the Department of Public Works, Government of American
                 Samoa, November 1975.

             7.  CH2M Hill, A Report on Immediate Improvements to Water System, Tafuna
                 Plains to Pago Pago Harbor Area, prepared for the Government of American
                 Samoa, March 1975.

             8.  CH2M Hill, Wastewater Facilities Plan American Samoa, prepared for
                 the Government of American Samoa, February 1976, two volumes.

             9.  CH2M Hill, Disinfection of Ground Water Supplies - Predesign Study,
                 May 13, 1977.

            10.  Civil Engineering Staff-ASCE, "Citizen Participation for Successful
                 Village Water Supply", Civil Engineering, August 1978.

            11.  Dale, R. H., Inventory of Village Water Systems in American Samoa,
                 U. S. Geological Survey Basic Data Report, November 1970.

            12.  Dames &amp; Moore, Hydrologic Investigation of Surface Water for Water
                 Supply and Hydropower, Tutuila I51and, American Samoa, September 1978.

            13.  Davis, D. A., Ground Water Reconiiai.ssance of American Samoa,
                 U. S. Geological Survey Water-Supply Paper, 1608-C, 1963.

                                                  R-1
<pb n="185" />

              14.  Eckbo, Dean, Austin &amp; Williams, American Samoa, General Plan,
                   Interim Report, November 1972.

              15.  Eckbo, Dean, Austin &amp; Williams, American Samoa, Preliminary General
                   Plan, Phase II, October 1972.

              16.  Flanagan, M. J., American Samoa's Water System Improvement Program,
                   April 1976.

              17.  Gilbert Associates, Inc., Leak Detection Survey and Personnel
                   Training, July 1974.

              18.  Government of American Samoa, Comprehensive Health Planning Advisory
                   Council, Gastroentritis and Infantile Diarrhea, Goals, Objectives and
                   Recommend-ations, November 10, 1975.

              19.  Government of American Samoa, Health Planning and Development Agency,
                   Department of Health, Infantile Gastroentritis and Diarrhea, Plan for
                   Improvement, revised March 10, 1978.

              20.  Government of American Samoa, Development Planning Office, Overall
                   Economic Development Program, June 1974.

              21.  Government of American Samoa, Development Planning Office, Summary
                   of Community Participation Efforts, FY 1977-1978.

              22.  Government of American Samoa, American Samoa Code, 1973.

              23.  Gutierrez, Leonardo V. Jr., "Water Supply Feasibility Studies in
                   Philippines", Journal of Urban Planning and Development Division-ASCE,
                   Vol/04 No. UPI, May 1978.

              24.  Linsley, R. K., M. A. Kohler and J. L. H. Paulhus, Hydrology for
                   Engineers, McGraw-Hill Book Company, 1958.

              25.  Malae, Abe Utu, The Effect of the Safe Drinking Water Act on American
                   Samoa, 1976.

              26.  McGarry, Michael G., "Sanitary Sewers for Developing Countries",
                   Civil Engineering-ASCE., August 1978.

              27.  Morris, Randy, Public Works Role in Developing American Samoa, 1976.

              28.  R. M. Towill Corporation, Contract Documents and Specifications for
                   Construction of FY 175 Water Distribution System: Tafuna, Nuuuli,
                   fagalalu, Utulei, Pago Pago, Atuu, prepared for the Government of
                   American Samoa, 1974.

                                                   R-2
<pb n="186" />

             29.  R. M. Towill Corporation, Analysis of Water Distribution System,
                  prepared for the Government of American Samoa, not dated but estimated
                  at January 1975.

             30.  R. M. Towill Corporation, Preliminary Report-Analysis of Vaipito and
                  Fagalalu Water Treatment Systems, 1973.

             31.  R. M. Towill Corporation, Basis for Design--FY 174 Water System
                  Expansion, January 1974.

             32.  R. M. Towill Corporation, Standard Specifications and Construction
                  Details for Water Distribution System, November 1975.

             33*  R, M. Towill Corporation, Final Report--Analysis of Vaipito and
                  Fagalalu Treatment Systems, June 1973.

             34.  Sinclair, Roger L., Report Covering a Salt Water Fire Projection
                  System, May 1971.

             35.  Stice, G. D. and F. W. McCoy, Jr., "The Geology of the Manula Islands,
                  Samoa", Pacific Science, 1968, volume 22, no. 4, pp. 426-457.

             36.  Stearns, H. T., "Geology of the Samoan Islands", Geological Society
                  of America, Bulletin, 1944, volume 55, pp. 1279-1332.

             37.  URS/The Ken R. White Company, Inventory of the Economic Development
                  Administration Village Water Systems Program: EDA Project No. 07-11-00809,
                  prepared for the Department of Public Works, Government of American Samoa,
                  October 1975.

             38.  U. S. Army Engineer District, Honolulu, American Samoa Water Resources
                  Study Plan of Study, December 1977.

             39.  World Bank,.Village Water SupplX A World Bank Paper, March 1976.

                                                  R-3
<pb n="187" />

                                APPENDICES
<pb n="188" />

                                                APPENDIX A
                                      GAS SYSTEM WATER USAGE REPORTS

   11
<pb n="189" />

                                                                               GAS SYSTEM VkM USAG2 - neTnRER 1977-
                                                        M21;ared      zatir-Itai                                                  Matimated
                                                       C@-"Sump-      Unmstered                                                   Residential
                                   Number of           Lion, MG       Consunp-    Largest Metered         Largest Unmetered       Populatier.     ?rlmary  Water
         Villasr                   Acco-ints Ylat                     tion, MG    Consumption. MG         Consumption, MG         Served          Sources

             Futtga                   50       None         622                                                                       300         111111 well
             IMIL                     48                   .872                  John Vienn'.985                                      600         11tilt well
             Vaitogi                  76                 1.357                                                                        700         111111 well
             Pfiva'ift'i              45                   .486                                                                       800         Malnelmi well
            .Hapusaga Fou             16                   .144                                                                       100         Legopuna   catch

             Faleniu/Iiapusega        22                 1.975                   C. College 1.927                                     250         14slaelml  well
             Malaelmi                 25                   .726                  Kong Yung .215                                       100         Malaelml   well
                                                                                 Coca Cola .731                                       4200        A (Tsfuna Wells
             Foganeanea/Nu'u'uli     169       02        3.711                                        1
             Tafuns                                                              FAA Housing .204                                                   (Water catchm
             Fatumafutt               07                   .130                  Kong Yung .315                                       100              A
             Tagaalu                  38                   .587                                                                       400         5 (A
                                                                                                                                                    (Fagaalu catc
             Utulei                   87       28        2.867                   Rainmaker-2.036                                      900         B
                                                                                 Standard Oft .116                                                Utulei well
                                                                                 Morris S- .112

                                                                                          r
             Fagatogo                151       42        2.221                   Lumana't .148                                        1800        C (B
                                                                                 Ileadow Cold .240                                                  (Fagatogo cat
             Pago Pago /Satala       202       46        5.183                   B.F.K.   1.007                                       2400        D (C
                                                                                 Solis R. '257                                                      MUM&amp; catcl
             Atu'u                    34       04          .417                                                                                     (Paro well
             Canneries                02                 11.319                  SK 7.295                                             500         Utumoa catchmer
                                                                                                                                                       D
             Leloaloa                 to                   .119                  VC 4.024                                             200              D
                                     990       12S     32*.936 MT                                                                   13,350
             Total Water
             Accounted for:          74.0, IIG
             Total water outpu.1                                                         9 accounted for: @0.9%                                          Approxim
             for month of Oct.      134. 7 P.                                                                                                            of meter
<pb n="190" />

                                                                                         IUS          111;m,,.:,@        OVI(k.tV I

                                                                             Unzei:ered                                                         Residential
                                        VU4@,.Gr of                 14G      Consump-      Largest Materar;          Largest Unmet.,.--2d       Population       Primary Water
                                        Accounts     f-lat                   tion. MG      Consunition. MG           Consumption, HG             Served          Sources

           Futiga                       50           -0-       301*
           111111                                                                                                                                   300          Iltill well
                                        44           -0-       .668                                                                                 600          111111 well
           Valtogi                      76           -0-     1.231
           Pava'la't                    45           -0-       .390                                                                                              111111 well
                                                                                                                                                    800          Halaeimt well
           Mapusagafou                  17           -0-       .09 7*                                                                               100          Lagopuna catchm

           Folentu/Hapusaga             24           -0-     2.363                        College 1.924                                             250          Halaelml well
           Malaelml                     27           -0-       .985                       Kong Yting .228                                           100          Malaelml well
           Nuu'uti/Tafu'na/             165          02      3.734                        Coca Coln 1.42                                           4200          A (Tafuna wells
           Faganeanea                                                                                       8
           Fatumafuti                   07           -                                    FAA Housing .296                                                         (Witer catchm
                                                     0-        144                                                                                  100                  A
           Fagsalu                      35           -0-       .554                                                                                 400          B (A
           Utulet                       86           28      2 .939                      Hotel 1.043                                                900            (Fagaalu catc
                                                                                         Morris S. .288                                                              B
                                                                                         S. oil .109                                                                 Utulel well
      :C-  Fagatogo                     143          42      2.117                       Lumana'i .194
                                                                                                                                                  1800           C (B
                                                                                         Meadow Gqjd .246                                                          (Fagatogo cat
           Pago Pago/Satsla             202          48      5.069                       AAA Gym .132                                             2400           D (C
                                                                                         Korea House .375                                                          (Utumoa catch
                                                                                         Soli's Rest .305                                                          (Pago well
                                                                                         B.F.K. 1.429
           Atu'u                        33           04      1.444                       Fishermen C.     .818                                     500               D
           Canneries                    02                  16,672                       SK-8.908                                                                    D
           Leloaloa                     18           01        .281                      IVC-7.764
                                           -         -                                   1                                                         200               D
                     TOTALS             974        125       .36-960         42,4              226.413                                          13,350
           Total water account d
           for:                         81.4
                                                                                  r
           Total water output           -                                                ill. -al cul-lioctbinn)
           for month of Novemb r:154.4
                                                                                                                                          *-4proximately 190%        of co@suffjptj
           Z Accounted fort             52.0@                                                                                                n )n,cannery C, Sto9mrs.
<pb n="191" />

     do

                                                                                                                                  Estiuated
                                                                                                                                  Residential
                                                                       Urmatered
                                                                      Ccn_,uq,?-   Largest Vatared       Largest Unmetered        Population      Primary Water
                                                                      tirc. k,.*G    nsumption,                   tion, VIG       served    --Sources
         Villag:                     Accaunts._@'.r                                Cc             yv"     Consuz.1
              Futiga                 53        None    1.487                                                                         300          111111 well
              111111                 47        None      .821                                                                        600          111111 well
              Valtogi                j78       None      .843                                                                       -700          Iltilt well
              Pava'lall              53        None    'I.010                                                                        Boo          Malaelmi Well

              Hapusegafou            .20       None      .333                                                                        100          Lagopunacatchm

              Faleniu/Mapusage       t28       None    2.665                       College 1.325                                     250          Malaelmi Well
              Halseimi               M         None      .691                      Kong Yung .166                                    100          Malseimi Well
              Nu'uuli/Tafuna)        175          02   4.777                       FAA Housing .339                                 4200           A (Tafuna Wel
                 Faganeanes                                                        Coca @ola 1.428                                                   (Water catc
                                                                                   Kong Yung .673
              Fatumafuti             07        None      .623                                                                        100                   A
              Fagaalu                40        None    1.263                                                                         400          5 (A
                                                                                                                                                    (Fagnalu cat

              Utulei                 93         28     2.783                       Rainmaker 2.198                                   900          B
                                                                                 Morris Scanlan .113                                              Utulei well

              Fagatogo               155        42     2.270                     Lumana'I .131                                      1800          C (a
                                                                                 Meadow Gold .240                                                   (Fagatogo ca
              Pago pago/Satala -220             48     5.907                     BFK 1.429                                          2400          D (C
                                                                                 Soli's Rest .196                                                   (Utumon catc
                                                                                 AAA Gym .155                                                       (Pago well

              Atu,u                  41         04       .903                    SK 6.246                                            500                   D
              Canneries              02                13.882                    VC 7.606                                                                  D
              Leloaloa               20         01       .663                                                                        200                   D

                      TOTALS         1.057     123-                    61.4                                                         13,350
              Total Water                              40,921  i
              Accounted for:         92.3HG                             Viter    i %rct,;s'_vj I,-)
              Total Water out                                              r,J i           :.)-I .. .... tion                                     A*-Approximatel
              .put for month of                                                                                                                     metered non-
              December               )31.8
<pb n="192" />

                                                                                 CAS SYSTEM WATE-R       3E - JANUARY, 1978
                                                           Hi7tered     Estimated-t                                                  Estimated
                                                           Consump-     Unmetered                                                    Residential
                                     Number of             tion, MG     Consump-     Largest Metered        Largest Unmetered        Population      Primary Water
            VIII                     Accounts    Fiat                   tion. HG     Consumption. HG        Consumption, HG          Served          Sources
            Futiga                      55       None      1.401                                                                        300          lliili well
            IIUIL                       45       None      .457                                                                         600          IlLill well
            Valtost                     76       None      1.732                                                                        700          111111. well
            Pava'ia't                   45       None      .887                                                                         800          Malaelmi well

            Hapusaga Fou                20       None      .519                                                                         100          Lagopuna catch

            Faleniu/Mapusago            26       None      1.663                     College 1.242                                      250          Malaeimi well
            Malaelmi                    25       None      .936                      Kong Yung .259                                     100          MalLeial well
            Ou'uuli/Tafuna &amp;            165      02        2.456                     Coca Cola 1.400                                    4200          A (Tafuns wel
            raganennea                                                               FAA Housing .267                                                   (water Cate

            Fatumafutt                  07       None      .108                                                                         100                  A
            Fogaalu                     38       None      .636                                                                         400           B(A
                                                                                                                                                        (Fagaalu ca

            Utulei                      83       None      3.455                     Rainmaker 2.627                                    900                 B
                                                                                                                                                          Utulel we

            ragatogo                   150        42       2.702                     Lumans'l .113                                      1800         C(o
                                                                                     Meadow Cold .190                                                 (Fagl;togo cpt
                                                                                     M. Bird .275
            Pago Pago/Satals           212        48       4.351                     AAA Gym .107                                       2400         D(C
                                                                                                                                                      (Utumos catch
                                                                                     K. Houge .242
                                                                                     Sall's Rest .202
                                                                                     BFK- .835
            Atu'u                                 04         .582                                                                       Soo                  .0
            Canneries                   02                 12.029                    SK - 7.254                                                               D
            Leloaloa                    to        01         .379                    VC - 4.775 .($USpe t-pater-wdermegigtral nrLY00                          D
                    70TALS           1005        125       340293   G. 42.3                                                             13,350
            Total water accounte     for:  76.6  M,G                                                                                                    Approximate
            Total water output       135.4-IIG                              % acc unted for 56,6%                                                       metered non
            for January:
<pb n="193" />

                                                APPENDIX B
                                        GROUND  WATER DEVELOPMENT
                                             IN AMERICAN SAMOA
<pb n="194" />

                                GROUND WATER DEVELOPMENT
                                           IN
                                     AMERICAN SAMOA

                          U.S. ARMY ENGINEER DISTRICT, HONOLULU
                                       AUGUST 1978
 . I
   'I
<pb n="195" />

                                             TABLE OF CONTENTS

                               GROUND WATER DEVELOPMENT IN AMERICAN SAMOA

                                                                                Page

                 INTRODUCTION                                                   B-1

                      Purpose and Scope                                         B-1

                      Geology and Hydrogeology                                  B-1
                        General                                                 B-1
                        Occurrence of Ground Water                              B-6
                        Tafuna-Leone Plain                                      B-7

                      Historical Overview                                       B-10
                        Background                                              B-10
                        Present Situation                                       B-13

                 RESULTS AND DISCUSSION                                         B-18

                      Sources of Information and Data                           B-18

                      Data Evaluation and Analysis                              B-19
                        Ground Water Quantity                                   B-19
                        Ground Water Quality                                    B-20
                        Ground Water Contamination                              B-25

                      Exploratory Well Drilling                                 B-27

                      Production Well Construction                              B-29

                 CONCLUSIONS AND RECOMMENDATIONS                                B-31

                      Problem Identified                                        B-31

                      Short-Term Recommendations                                B-32

                      Long-Term Recommendations                                 B-33

                 LIST OF REFERENCES                                             B-35
<pb n="196" />

                                         LIST OF TABLES

            Table No.                                                      Page

                      Surface Areas and Maximum Altitude of Each
                      Island                                               B-2

                2     Stratigraphic Section of Tutuila and Water-
                      bearing Characteristics of the Rocks                 B-3

                3     Listing of Major Water Production Wells in
                      Tafuna-Leone Area                                    B-15

                4     Maximum Contaminant Levels for Drinking Water        B-22

                                         LIST OF FIGURES

           Figure No.                                                      Page

                      Existing Water Production Wells in the Tafuna-
                      Leone Area (June 1978)

                2     Chloride Concentrations in Tafunafou Well
                      Field Discharges: January 1977 to June 1978          B-24

                3     Chloride Concentrations for Iliili and Malaeimi
                      Wells: January 1977 to June 1978                     B-26
<pb n="197" />

                                        GROUND WATER DEVELOPMENT

                                                   IN

                                             AMERICAN SAMOA

                                              INTRODUCTION

                 Purpose and Scope

                      The purpose of this report is to summarize and evaluate available
                 information and data on ground water development in American Samoa. The
                 report was prepared by the U.S. Army Engineer District, Honolulu, in
                 assistance to the American Samoa Government (ASG).

                      This presentation will include a summary description of the geology
                 and hydrogeology of the five major inhabited islands of American Samoa,
                 an historical overview of ground water development, a technical evalua-
                 tion of available information and data, and, finally, conclusions and

                 recommendations.

                 Geology and Hydrogeology

                      General. The geology and hydrogeology of the Samoa Islands have
                 been described by Stearns (1944), Davis (1963), Stice and McCoy (1968),
                 and Bentley (1975). The following discussion was extracted from their
                 reports and supplemented by more recently acquired information.

                      The islands of American Samoa are part of the Samoan Archipelago,
                 which lies roughly 1,000 miles south of the equator and forms a westward-
                 trending chain. The principal islands of American Samoa are Tutuila,
                 Aunu'u, Ofu, Olosega and Ta'u. These form the eastern part of the
                 archipelago and extend over a distance of about 100 miles. Ofu, Olosega
                 and Ta'u are collectively called the Manu'a Islands and are situated

                 about 65 miles east of Tutuila.

                                                  B-1
<pb n="198" />

                 All five islands are of volcanic origin and.exhibit the rugged
            topographic relief common to many Pacific islands. Table 1 lists the

            area and maximum altitude of each of these five islands.

                                              TABLE 1

                        SURFACE AREA AND MAXIMUM ALTITUDE OF EACH ISLAND

                                           Surface Area     Max. Altitude
                        Island            (Square Miles)         (Feet)

                       Tutuila                  53.0             2,140
                       Aunu'u                    0.6                300

                       Ofu                       2.0             1,590
                       Olosega                   1.5             2,090
                       Ta'u                    15                3,050

                 In his report Ground-Water Reconnaissance of    American Samoa Davis
            (1963) presents the following discussion (based on Stearns, 1944; of
            those geological features of the five islands that are pertinent to the

            occurrence of water.

                     "Tutuila is made up chiefly of basaltic rock that was
                 erupted from five volcanoes arranged in a rough east-west
                 line. The major activity, which occurred at four centers
                 in Pliocene or early Pleistocene time, produced shield-
                 shaped masses that merged into a single elongate island,
                 longer and broader than the present Tutuila. After activity
                 at the four centers ceased, deep valleys were cut by streams,
                 and the shoreline retreated under the attack of waves. Toward
                 the end of Pleistocene time, the island had been reduced to
                 approximately its present size and form. More recently, the
                 fifth volcano became active and built the Tafuna-Leone plain,
                 and a small submarine eruption off the east end of Tutuila
                 built the tuff cone that is now Aunuu. During the subse-
                 quent erosional period, sedimentary deposits were formed at
                 the foot of steep slopes, on valley floors, and along the
                 coast. The general character of the rocks on the island and
                 their relative ages are shown in the following stratigraphic
                 section (Table 2).

                                              B-2
<pb n="199" />

                                                                                                      TABLE 2

                                                          Stratigraphic section of Tutuila (after Stearns, 1944)                       and ivaier-bearing
                                                                                           characteriztici af the rocks

                                                                                           Thick
                                                   Geologic age       Formation            ness          General character             Water-bearing characteristics
                                                                                           (feet)

                                                                    Sedimentary            200+ Alluvium on valley floors;             Alluvium in mouths of valleys
                                                                      rocks                           talus at foot of steep slopes;        is moderattly permeable and
                                                                                                      calcareous sand and coral-            contuins rr(,Yh to brackish
                                                                                                      line gravel along coast.              water. Talus locally yields
                                                                                                                                            water in seeps and      'mall
                                                                                                                                            springs. Sand and gravel
                                                                                                                                            contain small supplies of fresh
                                                  Recent                                                                                    water.
                                                                    LeoneVolcanics         20G+ Oliviue basalt in pahoeboe- Lava flows under Tafuna-
                                                                                                      lava flo s: tuil in cones and         Lpone plain have moderate
                                                                                                      veneer owver lava flows; ash          to high pernicabilityand may
                                                                                                      and cinder in cones.                  contain considerable fresh
                                                                                                                                            water at about sea level.
                                                                                                                                            Tuff and ash have low per-
                                                                                                                                            meability and yield little
                                                                                                                                            water. A few small springs
                                                                                                                                            flow from cinder,

                                                                    Aunuu Tuff             200+ Taff forming Aunuu island.             Low permeability and yields
                                                                                                                                            little water.
                                                                                           -          Erosional unconformity --

                                                                    Traebyte               2,140+ Trachytic dikes        "       '     Low     permeability.       Yields
                                                                                                      crater fill younjer`tb.@..,,          water in high-level steps and
                                                                                                      of the Pliocene voleanics.            small sprias.

                                                                    T      tapu            1,63@+ Thin-bedded olivine basalt           Moderate permeability.
                                                                      Wulcafaics                      with interbedded tuff beds            Yields water at many seat-
                                                                                                      and cinder cones.                     tered bigh-level seeps and
                                                                                                                                            small springs.
                                                                    Paz Volcanic           1,609+ Lower member of tb in-bedded         Moderate to low permeability.
                                                                          tea (extra-                 olivine basalt; includes thin         Yields water at many scat-
                                                                      caldem vol-                     dikes and thin tuft beds.             tered high-level seeps and
                                                                      canics)                         Upper member of massive               small springs.
                                                  Pliocene and                                        basaltic and andesite flows;
                                                    earliest                                          interbedded tuff and cinder
                                                     Pleisto-                                         deposits.
                                                     cene M
                                                                    Pago Volcanic          2,141+     Massive basaltic and andesitle Mostly lovr permeability.
                                                                      Series (intra-                  lava 2ows and some inter-             ie s water at scattered
                                                                      calders' vol-                   bedded tuff and  breeei@ and          hilh-level seeps and small
                                                                      .W.)                            cinder cones; few thin lenses         prings.
                                                                                                      of gravel.                       L!
                                                                    Alofau                 M+ Thin-bedded          olivine basalt Lava flows between dikes have
                                                                      Voleanics                       with numerous dikes.                  moderate to high permea-
                                                                                                                                            bility. Rocks yield water at
                                                                                                                                            many high-level seeps and
                                                                                                                                            small springs.
                                                                    Olomoami               1,T24+ Olivine basalt and andesitic Moderate permeability.
                                                                      Voleanics                       basalt; interbedded cinder            Yield water at many high-
                                                                                                      cones and tuff beds.                  level seeps and small springs.

                                                                                                      Erosional (?) unconformity
                                                                    Masefau dike           200+ Thin b:3saltic flows cut y Low permeability. Yield
                                                                      complex                         many dikes.                           little water.

                                      Source: Davis, 1963

                                                                                                             B-3
<pb n="200" />

                     "The large number of eruptive centers in a small
                 area, the overlapping of rocks erupted from different
                 volcanoes, and the presence of dikes and interbedded
                 tuff, cinder, and breccia among the lava flows have
                 produced complex geologic conditions on Tutuila. The
                 bulk of Tutuila is formed by aa and pahoehoe lava
                 flows that range from thin-bedded flows with high
                 permeability to thick-bedded dense flows with low
                 permeability. The late flow rock on the Tafuna-Leone
                 plain is mostly thin bedded, but on older parts of
                 the island, particularly along the coast, the flows
                 are mostly thick and dense.

                     "Dikes are dense and impermeable, and where
                 their spacing is close, they may reduce greatly the
                 permeability of the rock that they cut. Unweathered
                 tuff may have moderate permeability, but weathered
                 tuff is almost impermeable. The breccia is mostly
                 dense and has low permeability. The permeability of
                 fresh cinder is high, but it may be greatly decreased
                 by weathering because of consolidation that occurs
                 during chemical decomposition. Lava flows, although
                 they far exceed the other types of rock in total volume,
                 are divided by dikes and interbedded tuff and breccia
                 into units which are irregular in size and shape. The
                 total vertical and horizontal extent of any unit of flows
                 is small as compared to the size of the island.

                      "The sedimentary rocks of recent age consist of
                 talus, alluvium, calcareous sand, and coralline gravel.
                 The talus is poorly sorted material, in which large
                 blocks are prominent, accumulated at the bottoms of
                 steep slopes along the coast and in steep-walled valleys;
                 the permeability of the talus is variable. Thick deposits
                 of alluvium, comprising poorly sorted mixtures of clay,
                 sand, gravel, and boulders derived from volcanic rock
                 fill extends below sea level at the mouths of some valleys
                 and has a permeability ranging from low to high. The
                 calcareous sand and gravel are composed of material origi-
                 nating in the reefs that fringe a considerable part of the
                 island and are most abundant in beaches at the mouths
                 of valleys; the calcareous deposits generally are more
                 permeable than the alluvium.

                      "Beneath a part of the late volcanic rock underlying
                 the Tafuna-Leone plain are sediments that were deposited
                 before the eruption of the Leone volcanics. The nature
                 and extent of these deposits are not known, but they
                 probably consist partly of talus and mainly of calcareous
                 beach deposits and alluvium.

                                             B-4
<pb n="201" />

                          "Tutuila's satellite island, Aunuu, is an
                      indurated bedded tuff produced by submarine
                      volcanic explosions. The tuff, in general, is
                      relatively fine grained and has been altered
                      sufficiently by weathering to make the material
                      nearly impermeable. The coastal flat on the
                      west and northwest sides of the island is under-
                      lain by material washed down from the cone and
                      by permeable deposits of calcareous sand and
                      gravel."

                 The Manu'a islands--Ta'u, Ofu and Olosega--were built by volcanic
                 activity along the crest of the easternmost portion of the Samoan Ridge
                 (Stice and McCoy, 1968).

                      The largest volcanic center in the Manu'a islands was at Ta'u where
                 basaltic flows of Pliocene and Pleistocene age built a single shield
                 rising more than 12,000 feet above the ocean floor and more than 3,000
                 feet above sea level. After the collapse of the summit of the shield,
                 the partial filling of the caldera to a depth of more than 1,000 feet
                 and a long interval of erosion, a complex of tuff deposits of Holocene
                 age extended over the northwest corner of the island near Faleasao; and,
                 at about the same time, flows of basalt and olivine basalt built the
                 shelf at Fitiuta at the northeast corner. The island consists mainly of
                 thin-bedded lava flows. Dikes are few and widely scattered except on

                 the south side of the island where a swarm of dikes and sills are

                 exposed. Beach deposits of sand and gravel lie along most of the shore
                 and a fringing reef borders much of the island (Davis, 1963; Bentley,
                 1975).

                      Ofu and Olosega were built by basaltic flows of Pliocene age from
                 two shields that coalesced to form one island. Partial collapse of both
                 shields and erosion by streams and the sea has cut deeply into the
                 original island and has reduced it to two small steep islands separated
                 by a narrow channel. Both of these islands, like Tau are composed of
                 thin-bedded basaltic lava flows whose permeability is high. Numerous
                 dikes cut the lava flows on the east end of Ofu and the west end of

                                                 B-5
<pb n="202" />

           Olosega. Sedimentary deposits of talus is common at the foot of the
           cliffs, in stream valleys and around the coast. Deposits of calcareous
           sand, gravel and cobbles mantle considerable parts of the shore of each
           island. Coral reefs surround most of both islands (Davis, 1963; Bentley,
           1975).

           Occurrence of Ground Water. According to Bentley (1975), rainfall is
           the source of all fresh groundwater in the islands. Rainfall that
           infiltrates into the ground and is not retained in the soil zone or lost
           through evaporation or transpiration by plants, percolates downward, and
           eventually recharges subsurface aquifers.

                High-level (or perched) ground water and basal ground water are the
           two principal types of aquifers found in the islands. High-level ground
           water is impounded or perched above sea level and separated from seawater
           by dikes and other geologic barriers. In some cases, the permeable
           zones between widely spaced dikes are highly productive aquifers.
           However, where the space between dikes is.small, the compartments are
           likewise small and the overall storage is smaller because of the larger
           proportion of dike rock to permeable rock (Davis, 1963). In the latter
           case, these compartments are low yield aquifers. Numerous springs that
           maintain the base flow of perennial streams, especially on Tutuila, are
           supplied by high-level aquifers where water is discharged over low
           points of dikes.
                                                ..                                               I
                Basal ground water is the water found near sea level in aquifers
           that are hydraulically connected with the ocean. It includes the sea-

           water in the rocks and the fresh to brackish to saline lenses which are

           maintained by freshwater recharge and float on the heavier seawater, or
           saltwater. The water in these lenses generally moves seaward when
           recharged sufficiently and discharges in narrow zones along the coast-
           line. It should further be noted that because of the direct hydraulic
           connection with the ocean, the basal ground water lense is also influenced

                                            B-6
<pb n="203" />

                by ocean tides. Tidal fluctuations are particularly evident where the
                basal lens is thinnest (usually near the coastline) and, therefore, an
                important consideration in selecting ground water development areas.

                     The basal ground water lens is also called the Ghyben-Herzberg lens
                after the co-discoverers of the principle that describes the phenomenon
                of freshwater floating on heavier saltwater. In sum, the Ghyben-
                Herzberg principle states that about 40 feet of freshwater below sea

                level is formed for each foot of freshwater above sea level to maintain

                hydrostatic equilibrium. Upon application of this principle, it also
                implies that if a cone of depression is formed about a well in fresh-
                water, saltwater may rise 40 feet for each foot of drawdown (Linsley et
                al, 1958).

                     None of the ground water found thus far in the islands is under
                appreciable artesian pressure. All of the* ground water discussed in this
                report is, therefore, believed to be under unconfined, free aquifer,
                non-artesian, basal watertable conditions.

                     Tafuna-Leone Plain. According to Davis (1963) and Bentley (1975),
                the most promising area for development of ground water on the main

                island of Tutuila is the Tafuna-Leone Plain.

                     This semi-circular shaped coastal plain extends from Nuu'uli to
                Leone and measures three miles north to south by five miles east to
                west. Its surface area is about 10,000 acres. It is bordered on the
                north and west by a sharp crested spiny ridge which rises 1,000 to 2,000
                feet in elevation above the plain. To the south, or ocean side, the
                plain is marked by a coral limestone fringing reef, 800 to 1,500 feet
                wide. The reef surface is at or near low tide level. The surface of

                the plain rises to the north from 10 feet along the ocean to 200 feet
                and more above sea level at the toe of the spiny crested mountains, a

                                                  B-7
<pb n="204" />

           rise of one foot in 50 feet or about one degree slope. The Tafuna-Leone
           coastal plain is the only flatland on Tutuila except for a few small
           alluvial valley floors'.

                The lava flows which formed the Tafuna Plain came from a north-
           south trending rift zone on the west side of the plain extending through
           Olotele to Olovalu to Futiga to Fogamaa cones and craters. The age of
           the flows is probably Holocene and may be only a few thousand years old
           judging by the youthful appearance of the cones, the freshness of the
           rock, and absence of a developed soil profile. The lava flows left
           surface mounds and ridges consisting of rough assemblages of red cinders
           (volcanic slag) and scoriaceous masses. On steeper slopes the flows are
           bordered by agglutinated splashes and veneers of glassy, vesicular rock.
           The porous structure of the rock is caused by the development of gas
           bubbles from the supersaturated lava and water vapor resulting from
           internal stirring of the lava which leaves voids or vesicles. There    is
           no pattern for the vesicles found in the upper part of the individual
           flow layer but in the middle and lower parts, the bubbles or voids,
           which were occupied by gas, become elongated into tube-like forms as the
           stiff, viscous material in which the bubbles are entrapped continues to
           move. The average alignment of vesicles is often parallel to the direc-

           tion of flow. There are other elements in the fabric of volcanic rocks

           beside vesicle alignment that show preferred orientation and can be
           correlated with flow direction of partly congealing lava. These elements
           are: sub-parallel alignment of feldspar laths; parallel orientation of
           alternate bands of crystalline and glassy basalt; and microjoints,
           slightly wavey, pencil-thin lines, or bands that are formed by tiny
           connected holes. Brown iron oxide staining has occurred around most of
           the holes which serves to outline and help identify vesicle (and indirectly
           lava flow) alignment. Permeability rates through rock layers varies
           with jointing systems,,crack patterns and developed flow channels.
           Hard, solid lava basalt is considered impervious and not good potential
           aquifer material.

                                            B-8
<pb n="205" />

                     Borings made for water wells near Tafunafou (one mile north of the,
                 airport). revealed thin layers of Pahoehoe olivine basalt alternating
                 with reddish gray clinkers and scoria, a sponge-like rock also known as
                 volcanic slag. Loose pockets, or layers of sand-gravel sized basalt
                 rubble were found in Well 60 (old Well No. T6; see Figure 1). These are
                 considered to be water-worn, rounded pieces of ancient beach and stream
                 deposit formed during lower stands of the sea. The extent and orienta-
                 tion of the old beach and stream deposits are not known.

                     The basal ground water underlying the plain was found to be only
                 two to three feet above mean sea level in the Tafunafou well field.

                 Unfortunately, the data needed to accurately determine the height of the
                 fresh ground water level relative to mean sea level were insufficient
                 at the time of this writing. Accurately referenced elevation data are
                 essential to determining the thickness of the basal ground water lens in
                 accordance to the Ghyben-Herzberg Principle. Freshwater springs which
                 release basal ground water to the ocean are commonly found along the
                 coastline of the plain at the basalt-coral interface.

                      Observations made in May 1975 demonstrated certain important charac-
                 teristics of this coastal plain basal aquifer and, in general, supported
                 previous findings by Davis (1963) and Bentley (1975). Following 4.6
                 inches of rainfall in 24 hours, the ground water level at the Tafunafou
                 well field rose more than 4 feet (temporary rise of 7 to 8 feet).
                 Subsequently, the basal water level was observed to drop at a rate of
                 1 foot in 48 hours (unpublished data, U.S. Army Corps of Engineers).
                 These observations indicate that the subsurface geology of at least
                 portions of the Tafuna-Leone plain are highly permeable and have little
                 storage capacity and low hydraulic head. Judging from the rapid rise of
                 the water table after heavy rains and the subsequent rapid decline, the
                 normal static water level probably stands only about one to two feet
                 above mean sea level over a good part of the year in the Tafunafou area.

                                                  B-9
<pb n="206" />

            Based on these previous observations, the basal freshwater lens at
            Tafunafou can generally be described as a thin, sensitive lens that can
            be subject to saltwater intrusion problems.

                 The soil-rock alluvium in the small and steep valleys and narrow
            coastal plains of the islands are the products of residual decay and
            weathering. The slow chemical disintegration of extrusive igneous rocks
            forms sesquioxide clay minerals which act as binding agents, much
            like iron rust, to unite and cement the soil and rock particles together.
            Several test holes have been drilled in the narrow and steep valleys
            around Pago Pago Harbor with unfavorable results. Where water has been
            found, the quantities are small and the quality is generally objection-
            able due to some form of pollution.

            Historical Overview

            Background. The first known effort to develop basal ground water was by
            the U.S. Navy in 1943 when they built the Maui well system near the head
            of Pago Pago Harbor. The well system has 325 feet of horizontal infiltra-
            tion tunnels at the bottom of a shaft 76 feet deep. At the time of
            construction, the static water level was 24 feet above sea level, and
            the yield was about 200 gallons per minute (gpm). The rocks cut by the
            tunnels were lava flows, breccia, and dikes. Two faults were crossed by
            the tunnels. The high water level and the complex geology exposed in
            the tunnels indicate that the ground water at the site of the well is
            impounded (i.e., perched) and separated from seawater by dikes and other
            geologic structures (Davis, 1963).

                Actual well drilling to develop ground water sources started in the
            1960's. Although modern well drilling equipment was not available in
            American Samoa during this period, about 20vells (in some cases, no
            more than holes) were drilled with an old percussion drill which was
            brought from Australia by Darcy J. Gilbert Drilling Company.

                                            B-10
<pb n="207" />

                 Unfortunately, technical guidance was lacking and no records were kept.
                 As a result, information about.the drilling work and the efficiency of
                 the completed wells is non-existent. Some of these wells are listed in
                 Table A-1 of Bentley (1975).

                      In 1962, the U.S. Geological Survey (USGS), in cooperation with the
                 American Samoa Government, expanded its investigation of surface water
                 resources (which had commenced in 1957) to include ground water resources.
                 A description of the availability and chemical quality of ground water
                 based on the USGS data collected over the period 1962-1975 can be found
                 in Bentley (1975).

                      During the years of 1972 to 1975, ten more wells were drilled by
                 the Hawaiian company, Water Resources International. A Failing Model
                 1500 rotary drill with clay drilling muds was used. The use of drilling
                 muds for developing water wells in the Tafunafou area, however, was

                 found to be undesirable.

                      While drilling muds in various forms are often used in oil wells to
                 help bring bit cuttings to the surface and to stabilize the walls of the
                 hole, in water well drilling, the drilling mud escapes into the cracks
                 and openings in water bearing layers (aquifers) and reduces permeability.
                 To achieve the full water yield potential of the aquifer, the mud must
                 be removed. Removal of the mud is costly and time-consuming; and, for
                 these reasons, few contractors will take the time to remove the objec-
                 tionable clay residue. To avoid these problems, most companies now
                 employ non-contaminating drilling fluids (including self-destructing
                 enzyme-based fluids), the use of a drilling casing, or choose drilling
                 methods that do not require artificial means to remove cuttings.

                      Unfortunately, the holes drilled during the early 1970's were not
                 properly cleaned, surged and developed and may have contributed to
                 uncorrelatable well pumping results, such as unexplainable salinity

                 variations from hole to hole.

                                                  B-11
<pb n="208" />

                 In 1974, American Samoa experienced the most severe drought in
            recen t history. Water had to be trucked to many outlying villages where
            private water supplies had dried up; and strict water rationing of
            limited quantitites available from the surface water supplied government
            system forced the territory's major private industry, the tuna canneries,
            to shut down operations for about 6 months.

                 Several federal agencies responded to this critical situation. The
            Federal Disaster Assistance Administration provided emergency funding to
            temporarily relieve the situation (Burnham, 1974). The U.S. Geological
            Survey initiated an investigation to describe and evaluate the availability
            and chemical quality of ground water in the islands, with emphasis on
            the Tafuna-Leone Plain on Tutuila (Bentley, 1975) and the U.S. Army
            Corps of Engineers, Pacific Ocean Division, provided the technical
            assistance needed for exploratory well drilling and production well

            construction.

                 The drought situation and its serious impacts focussed attention on
            the poor condition of the existing water systems. As a result, the
            American Samoa Government (ASG) was able to acquire federal grant funds
            for water systems improvements.

                 During the period immediately following the 1974 drought, a water
            systems improvement program was formulated by the local Department of
            Public Works. As part of this program and in search of more reliable
            and safe sources of water for the centralized government system, the
            decision was made to pursue a program that would eventually phase out
            surface water sources and depend completely on ground water as a source
            of water for the central system. Economics heavily influenced this
            decision. A surface water supply study (CH2M Hill, 1975), which was
            completed not long after the drought, estimated the project cost for an
            ample supply of water for the island during any dry spell to be $19.5

                                             B-12
<pb n="209" />

           million. Ground water development, on the other hand, was estimated to
           require only one-seventh of this amount and would provide a.much larger
           storage capacity (Flanagan, 1976).

                In 1976, there were four water producing wells in the Tafunafou
           well field, averaging between 700 and 1,200 gallons per minute total
           (combined) yield with chloride contents ranging from 65 ppm to 1,200
           ppm, The Iliili area had two wells producing about 200 gpm in 1974.

                In the year May 1975 to May 1976, the Ground Water Development
           Corporation (GWDC, a Samoan drilling company) constructed 15 new water
           wells using improved methods with screens, sanitary seals, surging,
           developing and pump testing.

                The choice of drilling equipment and drilling and sampling methods
           (coring preferred) are most important in the discontinuous volcanic rock
           layers. The down-the-hole percussion drill is limited by loss of air in
           the voids and cracks in the rock which requires cementing (sealing) the
           porous layers and slows the drilling rate. Straight rotary drilling is
           limited by requiring some kind of drilling fluid to seal the walls of
           the hole and to bring bit cuttings to the surface. Above the ground
           water level, the method of drilling is not important as long as a
           straight vertical hole can be made and a sanitary cement seal is placed
           around the casing, Below the water table, continuous representative
           samples should be taken in all well construction work. It is also
           important that the logging, gradation, classification and analysis of
           the samples be done by an experienced hydrogeologist to establish and
           maintain the reliability and the quality of the drilling data gathered.

           Present Situation. Figure 1 shows the existing water production wells
           in the Tafuna-Leone Plain area. It is supplemented by Table 3 which is
           a descriptive listing of the major Tafuna-Leone wells as of June 1978.

                                            B-13
<pb n="210" />

                 It should be noted that the wells shown in Figure 1 serve two separate
                 systems. The wells to the east of Futiga serve the central ASC system
                 and those to the west of Futiga serve the Leone system. Although a plan
                 to combine the two systems has been proposed, it has yet to be implemented.

                      The current combined yield of the ASG wells was recently reported
                 to be 1,650 gpm, or 2.4 MGD (unpublished data, ASG Dept. of Public
                 Works, May 1978). The Leone wells produce a total of about 0.4 MGD.

                      As noted in Table 3, several of the proposed production well sites
                 have real estate or right-of-way acquisition problems. Over the years,
                 attempts to successfully develop ground water in American Samoa have
                 been constantly hampered by the local Government's inability to gain
                 access to favorable sites for exploratory drilling and, subsequently,
                 the right-of-way needed to construct production wells at sites deter-
                 mined to have good potential. In some cases, these problems have gone
                 unresolved for years. As a consequence, the primary criteria practiced
                 in the selection of exploitable well sites include not only geological
                 and hydrological characteristics, but also the government's ability to
                 gain access to the site. It is also not surprising, therefore, to find
                 that, in some cases, past ground water development activities have been
                 directed to areas that may not appear to have the most promising poten-
                 tial from a technical standpoint.

                      A number of attempts to develop ground water sources outside the
                 Tafuna-Leone area have also been made. In general, however, most of the
                 resulting production wells have been relatively low-yielding (i.e., less
                 than 50 gpm). Drilling logs and well records, as well as the results of
                 pumping tests, for selected wells can be found in the appendices of
                 Bentley (1975). The following discussion will briefly describe some of

                 these wells that are still in use.

                                                 B-14
<pb n="211" />

                                                      TABLE 3

                                LISTING OF MAJOR WELLS IN TAFUNA-LEONE AREA
                                                  (August 1978)
                              Year                    Well Depth Averaged Performance Datal/
             wall No.          of                     (Ft Below     Pump Rate          Chlorides
          (Old  Well No.) Constr.      Location         Ground).       (GPM)            (Cl, Mg/1)        Remarks

            33  UA)           1970     Tafunafou             93         194                  65       Operational
            46  (1)           1972     Tafunafou             92         120                  42       Operational
            32  (T2)          1973     Tafunafou           100          186                 313       Operational
            53  M)            1973     Tafunafou           150          112                 305       Operational
            55  (TlO)         1974     Tafunafou           180          173                 544       Operational
            60  (TO           1975     Tafunafou           125          322                 300       Operational
            61  (T8)          1975     Tafunafou.          125          327                 263       Operational
            62  (15)          1975     Mili                225          207                  96       Operational
            63  (16)          1975     111111              205           -                   -        Abandoned
            65  (T11)         1975     Tafunafou             99         200                  -        Operational
            66  (T16)         1976     Tafunafou           105          330                 226       Operational
            67                1976     Malaeimi            115          230                  -        Operational   2/
            68                1976     Tafunafou           104           -                   -        DD Problem    -
            69                1976     Malaeimi            175          120                 297       Operational
            70                1976     Malaeloa            145          150                           Operational   3/
            71                1976     Tafunafou           106           -                   -        RE Problem    -
            72                1976     Tafunafou           160          400                  -        Under Const.
            73                1977     Malaeloa            137          150                  -        No Pump
            74                1977     111111              240           -                   -        RE Probl
            75                1977     Malaeloa            190           -                   -        Under Const.
            76                1977     Mili                204          200                  75       Operational
            77                1978     Tafunafou           149           -                   -        DD Problem
            78                1978     Tafunafou           143                               -        Abandoned

          l/    Computed from available USGS data for period 7 January 1977 thru             6  June  1978.
          2/    Serious drawdown problems currently being encountered.
          3/    Real Estate or Right-of-way acquisition problems.

          NOTES:

          1.    Current static water level and drawdown data unavailable.
          2.    All wells are 8-inch nominal diameter eased and screened.
          3.    Well 55 pumped as demand requires.
          4.    The well numbering system is based on well 60 (T6), the first well designed and
                constructed under supervision of POD. The number 60 was arbitrarily assigned
                to well T6 on the basis that 59 holes have been previously drilled elsewhere
                an Tutuila.
          3.    Missing entries due to unavailable data.

          SOURCES:
          - Department of Public Works, American Samoa Gover=ent
          - U.S. Army Corps of Engineers, Pacific Ocean Division
          - U.S. Geological Survey

                                                             B-15
<pb n="212" />

                The Pago shaft which was built by the Navy in 1943 is still in
           operation and serves the central ASG system. Its present yield is about
           120 gpm. Other attempts to develop wells along the Vaipito Stream in
           Pago Pago have either been abandoned for sanitary reasons or have resulted
           in very low-yielding wells.

                The village of Tula at the eastern end of Tutuila uses a drilled
           well as part of its water supply. This 110-foot deep well was built in
           1972 and presently yields less than 30 gpm.

                The village of Aunu'u on Tutuila's eastern satellite island is
           served by three shallow dug wells that skim the shallow freshwater lens
           of the island, One well has been pumping very brackish water for some
           time now and is expected to be relegated to emergency service upon
           completion of a current project which is attempting to improve the
           efficiency of the two remaining wells and to renovate the pumping
           facilities. To date, this project has accomplished connecting the two
           wells with 170 feet of slotted pipe laid below sea level (high tide).
           As a result, both wells have been yielding about 60 gpm (total) of
           water with satisfactory chloride levels for several months. More
           collector lines are anticipated to be installed as necessary.

                Several villages in the Manu'a Islands rely on ground water. The
           village of Ofu on the island of Ofu is presently utilizing a 30-foot
           deep dug well which yields about 30 gpm of good quality water. The pump
           used at this well, however, suffers from no maintenance.

                The village of Olosega on the island of Olosega is also served by a
           dug well about 36 feet in depth yielding about 30 gpm. According to
           the villagers, the quality of the water pumped varies from fair to

           sometimes salty.

                                              B-16
<pb n="213" />

                      On the island of Ta'u, the Manu'a District High School and the
                 villages of Luma, Ta'u, Suifaga and Fusi are served by a drilled well
                 which yields about 120 gpm. This well is, at times, not adequate for
                 all service areas. The village of Fiti'uta uses a small well (less than
                 10 gpm) near Faga Spring as one of its sources of water. The water
                 pumped from this well is reported to taste salty during rough seas.

                                                  B-17
<pb n="214" />

                                  RESULTS AND DISCUSSION

          Sources of Information-and Data

               The major sources of information and data used in this report were
          three governmental agencies: the Department of Public Works of the
          American Samoa Government, the U.S. Geological Survey, and the U.S. Army
          Corps of Engineers, Pacific Ocean Division.

               The ASG Department of Public Works is, of course, the primary
          source of information regarding water systems in the Territory and
          related improvement programs. The Public Works Director and his staff
          have been very generous in providing the assistance needed in preparing
          this report.

               The USGS through its previous investigations (Davis, 1963, and
          Bentley, 1975) and its ongoing surface water and ground water monitoring
          activities is a major source of hydrologic data for the Territory, as
          well as other Pacific areas.

               Since the 1974 drought, the U.S. Army Corps of Engineers has
          provided technical assistance, as needed, for ground water development
          to American Samoa. During Fiscal Year 1977, the Corps assisted ASG in
          initiating an exploratory well drilling program by supplying test drilling
          equipment along with the technical expertise needed to implement the
          program. At the end of FY 1977, all drilling equipment was transferred
          to ASG for the continuation of the exploratory amd well construction
          program. The knowledge and records gained through this affiliation
          comprise another valuable source of information and data on ground water
          development in American Samoa.

                                           B-18
<pb n="215" />

                  Data Evaluation and Analysis

                       The information and data gathered from the above sources were
                  evaluated and analyzed in an attempt to better define problems and to
                  gain further insight into the ground water situation in American Samoa.
                  The following discussion will focus upon the topics of ground water
                  quantity, ground water quality, and ground water contamination. The
                  data analyzed were, for the most part, extracted from weekly USGS
                  records collected for wells in the Tafuna-Leone area over the period
                  January 1977 to June 1978.

                  Ground Water Quantity. The only attempt to quantify the amount of
                  ground water in storage in American Samoa was made by Bentley (1975) for
                  the Tafuna-Leone aquifer. Due to the lack of essential data, he was
                  unable to compute an accurate estimate; however, based on estimates of
                  the area, the thickness of the lens, and an assumed specific yield of
                  the aquifer of 0.1, he estimated that the amount of freshwater in
                  storage was probably about 50,000 acre-ft. Average annual recharge to
                  the aquifer which he based on rainfall-runoff characteristics and
                  estimated transmissivity values was roughly estimated at 30,000 acre-ft
                  (about 27 MGD).

                       Depite the time that has lapsed since Bentley completed his inves-
                  tigation in 1975, an attempt to better estimate available ground water
                  quantities--to include estimates of safe yield or permissible ground
                  water withdrawal rates--cannot be properly performed at this time. Upon
                  examination of available well records and discussions with knowledgeable
                  people, certain discrepancies have been found to exist that limit the
                  type of analyses that can be made. Foremost of these discrepancies was
                  the finding that elevation data were not accurately referenced to mean
                  sea level. The lack of reliable elevation data precludes accurately
                  estimating the thickness of the freshwater lens, ground water storage and
                  changes in storage. At the time of this writing, this problem is being,
                  or has been, rectified by the ASG Department of Public Works.

                                                   B-19
<pb n="216" />

                The pumpage rates for each well Is also not known since not all
           production wells are metered. This problem undermines any attempt to
           evaluate the performance of each production well and its effects upon
           the aquifer.

                Observation or monitoring wells (as were those drilled by the
           Corps) are drilled to measure changes that will take place at the bottom
           of the freshwater lens with either extraction by pumping or recharge
           from rainfall. The rapidity of change is indirectly a measure of the
           lens capacity and ultimate potential. In general, rapid response
           indicates limited storage and slow response suggests larger volumes.
           Critical changes in the composition of the freshwater lens occur near
           the bottom and can be used as a signal or warning for overpumping.
           Knowing the rate of change taking place in the lens per volume of fresh-
           water extracted or recharged allows for a fairly reliable estimate of
           the size, areal extent and thickness of the lens.

                Water wells can be designed, pumps installed and operated, and safe
           aquifer conditions maintained if all factors influencing change and well
           efficiency are known. It should also be noted that pumps should be
           installed at proper depths as a failsafe for overpumping under any

           circumstances.

           Ground Water Quality. The natural quality of fresh groundwater in
           American Samoa as indicated by available USGS and ASG data is generally
           very good. Except in areas where saltwater intrusion is a problem, it
           is suitable for domestic and current industrial uses in the Territory.

                The rates of infiltration and percolation of water through the
           overburden (surface layers) are so rapid that there is little time for
           much chemical activity (leaching and dissolving). Consequently, ground
           water is low in total dissolved solids. Because the rocks are relatively

                                            B-20
<pb n="217" />

                  new, soil cover is thin and weathering is shallow, the oxides and salts
                  found in older, more decomposed rocks are low to absent in Samoan deposits.
                  As is the case in the Hawaiian islands, the freshwater lens typically
                  contains less than 200 mg/l of total dissolved solids (predominantly
                  chlorides and carbonates).

                       The National Interim Primary Drinking Water Regulations (effective
                  24 June 1977) as provided for by the Safe Drinking Water Act of 1974 and
                  its 1977 amendments is applicable to American Samoa. It is administered
                  by the U.S. Environmental Protection Agency. An excellent discussion of
                  the Act and its implementation in American Samoa is presented in The
                  Effect of the Safe Drinking Water Act on American Samoa (Malae, 1975).
                  In addition to describing the island's physical and cultural setting and
                  its water supply situation, Malae discusses monitoring requirements,
                  evaluates the technical capability available on-island for compliance
                  with the Act and analyzes the various costs needed for implementation.
                  Table 4 is taken from Malae (1976) and lists the maximum contaminant
                  levels of the National Interim Primary Drinking Water Regulations and
                  the required monitoring frequencies for both surface and ground water

                  resources in American Samoa.

                       As is evident from the information presented thus far saltwater,
                  or seawater, intrusion into basal supplies is the most serious and
                  frequently encountered ground water quality problem in American Samoa.
                  It is the predominant factor determining the location and available
                  quantities of developable basal ground water. Over the years, it has
                  also led to the abandonment of many wells.

                       Although there are several ways to measure saltwater intrusion, the
                  chloride content or concentration, is perhaps the most common method
                  practiced.   Chlorides in reasonable concentrations are not harmful to
                  humans. At concentrations above 250 mg/l (as chlorides), however, they

                                                    B-21
<pb n="218" />

                                                             TABLE 4

                                         MAXIMUM CONTA@IINANT LEVELS FOR DRINKING  WATER*

                                          Maximum Con-                      Monitoring Requirements
                      Contaminant        taminant Level               Surface                 Groundwater

                      Inorganics
                      Arsenic            0.05 mg/1
                      Barium             1.00
                      Dacmium            0.01
                      Chromium           0.05
                      Lead               0.05                   Every three  years         Yearly
                      Mercury            0.002
                      Selenium           0.01
                      Silver             0.05
                      Fluoride
                       70.7-79.2 F       1.6
                       79.3-90.5         1.4
                      Nitrate           10

                      Organics
                      Endrin             0.0002 mg/1
                      Lindane            0.0044
                      Methoxychlor       0.1                    Every three years          Set by EQC
                      Toxaphene          0.0005
                      2,4-D              0.1
                      2,4,5-TP           0.01

                      Microbiological
                      Coliforms
                       Membrane Filter   1/100 ml               Monthly except GAS,        Set by EQC, but
                       MPN               10% for 10 ml          10 Leone, 4                villages, I/quarter
                                         60%  for.100 ml        Chlorine residuals may substitute 75% of
                                                                coliform samples; sample daily at least
                                                                4 times required coliform samples.

                      Turbidity          I TU monthly avg
                                         5 TU at EQC,option     Daily                      None

                      Radioactivity Gross alpha
                      Gross alpha        15 p Ci/1              None or  EQC option
                      Combined RA-226    5
                      Ra-228
                      Others                                    None

                      *National Interim'Primary Drinking Water Regulations (effective 24 June 1977).

                      SOURCE:    Malae, A. U. 1976. The Effect of the Safe Drinking Water Act on
                                 American Samoa. M.S, Thesis, University of Pittsburgh.

                                                             B-22
<pb n="219" />

                 give a salty taste to water which is objectionable to many people. For
                 this reason, the U.S. Public Health Service (in 1962) recommended the
                 limit of 250 mg/l for drinking water and other public uses, although
                 water containing higher concentrations can still be used if better water

                 is not available.

                      As was found by Davis (1963) and Bentley (1975), the largest amount
                 of developable fresh ground water--hence, the best chance of managing
                 saltwater intrusion--is the Tafuna-Leone aquifer where ground water
                 development has been focused over recent years.

                      Despite the data limitations discussed previously, the weekly USGS
                 well records do permit a qualitative evaluation of the performances of
                 certain production wells in terms of chloride concentrations. Figure 2
                 is a compilation of plots for monitored wells in the Tafunafou well
                 field over the period January 1977 to June 1978, with rainfall data
                 (from the weather stationat the Pago Pago International Airport collected
                 over the same period) shown at the top of the figure. It should be
                 noted that data were not available for all Tafunafou wells and, thus,
                 this figure is not representative of all wells individually. The
                 composite data, however, were collected from the combined well field
                 discharge line.

                      The value of Figure 2 is simply its illustration of the sensitivity

                 of basal lens to rainfall in the Tafunafou area. The almost immediate
                 (about a week or so) appearance of the chloride plots as "mirror-images"
                 of the rainfall plot--particularly after heavy rainfall--is indicative
                 of the sensitive, thin lens that exists in this area and supports
                 previous observations made in May 1975 (see page B-9).

                      While the composite plot does show that the Tafunafou well field as
                 a whole is still producing good potable water in terms of chlorides
                 concentration, the information gained from Figure 2 appears to highlight

                                                  B-23
<pb n="220" />

                                                                                FIGURE 2

                                      CHLORIDE CONCENTRATIONS IN TAFUNAFOU WELL FIELD DISCHARGES
                                                                  JANUARY 1977 TO JUNE 1978

                         215
                         0
                                                                                                                           -41,

                                                                                                                il \vI             N.,
                                                                                                                         L

                                                                                                    TAFUNAFOU   WELLS (OLD WELL     NUMBERS)

                                                                                                      0- - - -0 NO.'  33 0A)

                                                                                                      0--0 NO.        52 (TV

                                                                                                      &amp;----A    NOL   53M)

                                                                                                                NCL   GO(TS)
                                                                                                      &amp;---a     NO.   .61 (TS)

                                                                                                                NO.   66  (213)
                           650                                                                                  COMPOSITE
                                                                                                      NOTE:
                           0GO                                                                        NOT ALL TAFUNAFOU WELLS SHOWN
                                                                                                      INDIVIDUALLY ; BUT COMPOSITE DATA
                                                                                                      TAKEN FROM TOTAL (COMBINED) DISCHARGE.

                           No

                           450         1                                        A,
                       Z
                       0
                           400
                                                                     ww 41-ti
                                                                                                  ; -1   "      11            ; It

                       ac
                       I-                           %I              f                             @N\o,            It
                       Z   300                                                                                                A'
                                                                                                 if
                       z
                                                                                                                                 RE
                       0   2504                                                                                                     ON4  ENAD U MIT
                       w

                           no

                                                                                                        0       IV
                           so

                           0
                                                                                                                                         6-

                                                                                      B-24
<pb n="221" />

                 the limited amount of developable fresh ground water in this portion of
                 the basal lens and cautions against future overdevelopment at this well

                 field.

                      For comparison, Figure 3 shows available corresponding chloride
                 concentrations for a production well in Iliili (No. 62) and another near
                 the mouth of Malaeimi Valley (No. 69). Neither of these plots illustrates
                 the sharp response to rainfall that has been observed at Tafunafou. In
                 the case of the Iliili well, it may be because of its remoteness to
                 ground water recharge areas. The Malaeimi well also does not appear to
                 be as responsive to rainfall as those at Tafunafou, but has relatively
                 high chlorides concentrations that are not explainable at this time.

                 Ground Water Contamination. The importance of protecting potable ground
                 water supplies from all sources of contamination cannot be overemphasized.
                 Once contaminated, the integrity of ground water supplies is difficult
                 to restore. Treatment, as is the case with surface water, is expensive;
                 and the economic advantage of having good natural quality ground water

                 is lost.

                      In this regard, watershed management in tributary areas is as
                 important to protecting ground water sources as it is for surface water
                 supplies. Certain practices such as the subsurface disposal of domestic
                 sewage (e.g., via cesspools), other types of wastewaters or the use of
                 toxic substances (e.g., pesticides and herbicides) are likely to be
                 prohibited or stringently controlled.

                      As a general guideline, one of the first considerations that should
                 be given in ground water development is to select favorable production
                 well sites that are above, or upstream, of anticipated sources of contamina-
                 tion. Ground water under unconfined or water table conditions, like
                 surface water, flows by gravity. Achieving this advantage reduces the
                 need to impose strict land use controls.

                                                  B-25
<pb n="222" />

                                                               FIGURE 3

                                 CHLORIDE CONCENTRATIONS FOR ILIILI AND MALAEIMI WELLS

                                                     JANUARY 1977 TO JUNE 1978

                                                                                          1@ A

                                                       /%

                                                                               LEGEND

                                                                                     ILIM WELL NO. 62

                                                                              &amp;--A MALAElMl WELL NO. W

                    500
                  L
                    40
                  I.
                  @z

                                                                                         X -A
                  z 300

                                                                                       RECOMMENDED   IMIT

                               jo

                                                                                          ob

                                                                   B-26
<pb n="223" />

                      Since drilling penetrates the overburden above ground water sources,
                 all drilled holes must also be viewed as potential pipelines for intro-
                 ducing contaminants into subsurface supplies, and precautionary measures
                 must be taken. All observation and production wells should have properly
                 installed sanitary seals. Permanently abandoned holes and wells should
                 be fully grouted and sealed.

                 Exploratory Well Drilling.

                      The current exploratory drilling program in American Samoa was
                 initiated by the U.S. Army Corps of Engineers, Pacific Ocean Division
                 (Corps) in assistance to ASG during the summer of 1976. It started with
                 the arrival of a drilling rig complete with tools and supporting equip-
                 ment and technical Corps personnel from Korea to supervise and perform
                 the test well drilling operation, to train ASG personnel, and to furnish
                 technical direction for well construction by a private drilling contractor
                 (U.S. Army Engineer Division, Pacific Ocean, 1975 and 1976).

                      Over the following year more than one hundred exploratory and
                 investigation holes and six monitoring wells were drilled by the Corps-
                 ASG drilling team. Technical supervision was also provided in the
                 construction of 13 production wells built during this period.

                      With one or two exceptions, all holes drilled for observation and
                 monitoring purposes were 8 inches in diameter. All holes were grout-
                 sealed around the casing (in most cases, P.V.C.) and capped to make a
                 complete test well structure. A concrete pedestal was poured around
                 each cased hole at the ground surface and the hole number was perma-
                 nently printed in the cap. (NOTE: The threaded caps are wrench-tight
                 and are not considered vandal proof. For security reasons, more perma-
                 nent cap locks may be needed. Further, if any of these observation
                 holes are abandoned, it will be necessary to permanently seal the hole.)

                                                 B-27
<pb n="224" />

                In October 1977, although the Corps personnel returned to Korea,
            the drilling rig was transferred to ASG for continuation of the explo-
            r.atory drilling program. Following a period during which ASG lacked the
            technical expertise needed to continue the exploratory work, the program
            was resumed in May 1978 upon contracting the services of an experienced
            hydrogeologist and a well driller.

                In view of the information presented in the previous section
            regarding the threat of saltwater intrusion, it appears that the emphasis
            of the exploratory program should be focused on locating supplemental
            ground water sources -to alleviate the demand presently being exerted on

            the basal lens in the Tafunafou area.

                The wide and deep Malaeimi and Malaeloa valleys appear to have
            favorable subsurface conditions for freshwater. Depths to the water
            table in these valleys are greater than in the Tafunafou area (i.e., 150
            feet or more as compared to only 60 to 100 feet in Tafunafou), but the
            chances of finding more reliable sources of better quality water appear
            promising. They are both relatively large drainage basins; they are
            situated landward of the Tafuna-Leone Plain, thus, farther from the
            coastline and generally above the more populated areas; and, they may be
            substantial sources of recharge for the Tafuna-Leone aquifer.

                Judging from the drilling logs of wells 67, 69, 70 and 73 (see
            Figure 1), the erosion and shaping of the valleys were accompanied by
            the deposition of coarse grain sediments (potential aquifer materials)
            from fluvial and marine sources. Investigations to find, map and test
            these potential aquifers were among the objectives in Corps plans.

                The planned investigations were to drill enough test holes across
            the mouths of both valleys to be able to correlate boring logs from hole
            to hole and to prepare geological and hydrological profiles of the basal

                                             B-28
<pb n="225" />

                 water conditions. In order to be able to correlate boring logs, the
                 stratigraphic boring log at one particular location has to be interpreted
                 and compared with adjacent borings. The location (spacing) of each
                 individual succeeding boring is made on the basis of the interpretation
                 of the previous boring. The resulting profiles are used to accurately

                 measure the freshwater table level above mean sea level and to observe

                 the response across the valley to tidal action. If conditions are
                 favorable, this information will facilitate the location and construc-
                 tion of larger (12-inch minimum at pump setting) diameter wells.

                 Production Well Construction.

                      The construction of efficient and permanent water wells involves
                 two separate and distinct operations: the mechanical aspects of drill-
                 ing a hole in the ground, and technical supervision, which includes the
                 engineering and design of the well to fit the particular hydrology and
                 geology of subsurface conditions at each individual well site. In the
                 past 20 years, some 60 holes had been drilled on Tutuila without the
                 benefit of technical supervision; as a consequence little is known about
                 their construction other than the location, depth and, in some cases,
                 quality of water. The quality and quantity of water from these holes,
                 especially in the Tafuna-Leone plain, are directly related to the
                 uncontrolled manner in which they were constructed.

                      Recommended references for water well construction are: Manual
                 No. 7, "Water Well Construction," U.S. Army Engineer Division, Mediter-
                 ranean; "Ground Water and Wells," published by Eduard E. Johnson, Inc.
                 UOP, Inc., P. 0. Box 3118, St. Paul, Minnesota 55165; and "Manual of
                 Water Well Construction Practices," EPA-570/9-75-001, Environmental
                 Protection Agency, Office of Water Supply.

                      Based on the knowledge and experience gained in American Samoa, the
                 following are some suggested guidelines for the design and construction
                 of production wells:

                                                 B-29
<pb n="226" />

           A*   Wells should be sized to yield the safe, maximum quantity and
                provide two casing sizes.of clearance between pump bowls and casing
                to allow for movement, seismic shifting, construction deviations in
                alignment or plumbness, and for future maintenance. A twelve-inch
                diameter is the smallest casing size desirable for wells which
                produce 250 gallons per minute and more.

           B.   Well construction techniques practiced by GWDC (Ground Water
                Development Corporation) were approved by the Corps of Engineers
                for shallow (less than 200 feet deep) wells and, in general, are
                suitable in extrusive volcanic aquifersi Modifications and changes
                in the techniques should not be attempted without the approval of a
                qualified technical supervisor.

           C.   Continuous sampling, logging and testing (gradation and classifica-
                tion) should be done below the ground water table level.

           D.   All permanent water wells should have sanitary seals installed
                under technical supervision.

           E.   Elevation of ground water, amount of change and time lag compared
                with tidal cycle and quality of water with depth will determine the
                depth of the hole and permanent pump setting.

           F.   Design of Wells: Length, diameter and slot size of screen (wire
                wound, continuous slot, welded), position in hole, final depth of
                hole, yield-drawdown pumping tests and quality of water are impor-

                tant features and should be controlled and recorded.

                                           B-30
<pb n="227" />

                                      CONCLUSIONS AND RECOMMMATIONS

                       The natural quality of fresh ground water in American Samoa is very
                  good. It meets the maximum contaminant levels set forth in the National
                  Primary Drinking Water Regulations for the parameters measured and is
                  suitable for domestic consumption and current industrial uses in American
                  Samoa. The problems encountered over the years are primarily due to the
                  previous lack of technical expertise and other management and training

                  needs.

                       The following is a summary of the problems identified in this study
                  and the short-term and long-term recommendations developed in solution
                  to these problems.

                  Problems Identified.

                  A.   Saltwater Intrusion. Due to the "sensitivity" of the thin basal
                       freshwater lens near the coastline, saltwater, or seawater ,  intru-
                       sion has been a constant threat to ground water development in
                       certain areas, such as the Tafunafou well field.

                  B.   Ground Water Contamination. The potential for ground water contami-
                       nation due to indiscriminate waste disposal practices and improper
                       watershed management is another constant threat to the integrity of
                       ground water supplies. This problem is enhanced by the existence
                       of abandoned, unsealed holes and wells which can serve as direct
                       pipelines to ground water supplies, as well as production and
                       observation wells with inadequate sanitary seals.

                  C.   Right-of-Way Problem. Attempts to successfully develop ground
                       water in American Samoa have been constantly hampered by the govern-
                       ment's inability to gain access to favorable sites for exploratory
                       drilling and, subsequently, the right-of-way needed to construct
                       production wells at those sites determined to have good potential.

                                                  B-31
<pb n="228" />

           D*   Lack of Technical Expertise, In the past, the lack of qualified
                technical expertise (viz.,' experienced hydrogeologists and well
                drillers) to supervise and direct both the exploratory drilling and
                production well construction programs has resulted in well construc-
                tion records of little or no usefulness and poorly constructed

                wells.

           E.   InadequateOperating Data for Production Wells. Inadequate operat-
                ing data precludes evaluating the performance of each production
                well and exercising proper well field management. Each production
                well should be metered and should be equipped for static water,
                level and water quality monitoring.

           F.   Insufficient Observation Well Data. Except for a few sites, observa-
                tion wells are generally not monitored regularly.

           G.   Inaccurate Elevation Data. At the time of this writing, elevation

                data needed to determine the thickness of the basal freshwater lens

                with reference to mean sea level were found to be inaccurate and

                prohibited a quantitative analysis of the Tafuna-Leone aquifer in
                this study. This problem is being, or has been, rectified by the
                ASG Department of Public Works.

           Short-Term Recommendations

           A.   Exploratory Well Drilling Program:

                1.   Avoid over-development of the basal freshwater lens in the
           Tafunafou area by directing ground water development programs to other

           areas.

                2.   Investigate the potential of the Malaeimi and Malaeloa valleys
           which appear to be the most promising areas at the present time, as
           supplemental sources of ground water for the central government system.

                                            B-32
<pb n="229" />

                      3.   Conduct a ground reconnaissance survey of villages outside the
                 existing government system with water supply problems to identify and
                 inventory those'which are eligible for further ground water exploration.
                 The importance of having a qualified hydrogeologist to provide the
                 technical expertise needed for this survey cannot be overemphasized.

                 B.   Ground Water Contamination:

                      1.   Institute a program to seal abandoned and unsealed drilled
                 holes and wells and to assure that production and observation wells in
                 use have adequate sanitary seals.

                      2.   Select production well sites above, or upstream, of antici-
                 pated sources of contaminants, insofar as possible, to minimize the need
                 for strict watershed management and conflicting land uses.

                      3.   Coordinate waste collection and disposal (wastewater and solid
                 waste) and land use practices and plans to assure protection of ground
                 water supplies.

                 C.   Production Well Construction:

                      1.   Maintain the qualified technical expertise required in the
                 engineering, design, and construction of wells to fit the particular
                 hydrology and geology of subsurface conditions at each individual well
                 site and to oversee the mechanical aspects of well drilling (see section
                 on Production Well Construction in text for suggested guidelines).

                 Long-Term Recommendation

                 A.   Develop a Hydrologic Budget for the Island of Tutuila. A hydro-
                 logic, or water, budget is a method of quantifying the four phases of
                 the hydrologic cycle (i.e., precipitation,.evaporation and transpiration,

                                                  B-33
<pb n="230" />

           surface water and ground water) and their interactions for a given area.
           It is particularly useful in managing water supplies and in evaluating
           and forecasting the impacts of certain actions (e.g., dry spells,
           projected growth and demand, etc.) on each hydrologic component. It
           requires extensive data collected through well-conceived monitoring
           programs over extended periods.

                For American Samoa, the hydrologic budget should encompass the
           whole island of Tutuila as a complete hydrologic unit with special focus
           on the Tafuna-Leone aquifer because of its importance as the primary
           source of ground water. The U.S. Geological Survey and the National
           Weather Service are the primary agencies responsible for gathering
           hydrologic and meteorologic data in American Samoa. Discussions with
           USGS have revealed that their data gathering programs are directed
            oward this objective. ASG should continue to coordinate their moni-
           toring efforts to complement those of USGS and the National Weather
           t

           Service for the purpose of someday acquiring this capability.

                                            B-34
<pb n="231" />

                                           LIST OF REFERENCES

                 Bentley, C. B., September 1975. Ground-Water Resources of American
                 Samoa with Emphasis on the Tafuna-Leone Plain, Tutuila Island, U.S.
                 Geological Survey Water-Resources Investigations 29-75.

                 Burnham, W. L., 1974. Chronologic Summary of Activity and Information
                 from the U.S. Geological Survey, WRD, Technical Advisory Assistance to
                 Federal Disaster Assistance Administration on Drought in American Samoa,
                 9 October 1974. U.S.G.S. Water Resources Division, Menlo Park, California.

                 CH2M Hill, November 1975. Water System Study - Western Portion of
                 Tutuila Island. Prepared for the Department of Public Works, Government

                 of American Samoa.

                 Davis, D. A., 1963. Ground-Water Reconnaissance of American Samoa
                 Geological Survey Water-Supply Paper, 1608-C.

                 Edward E. Johnson, Inc., 1966. Ground Water and Wells.

                 Flanagan, M. J., April 1976. American Samoa's Water System Improve-

                 ment Program.

                 Malae, A. U., 1976. The Effect of the Safe Drinking Water Act on
                 American Samoa. M.S. Thesis, University of Pittsburgh.

                 Linsley, R. K., M. A. Kohler and J. L. H. Paulhus, 1958. Hydrology
                 for Engineers, McGraw-Hill Book Company.

                 Stearns, H. T., 1944. Geology of the Samoan Islands, Geological Society
                 of America, Bull. v. 55, pp. 1279-1332.

                                                 B-35
<pb n="232" />

          StIoe, G, D. and F. W. McCoy, Jr., 1968. The Geology of the Manu'a
          Islands, Samoa, Pacific Science, v. 22, No. 4, pp. 427-457.

          U.S. Army Engineer District, Honolulu, December 1977. American Samoa
          Water Resources Study - Plan of Study.

          U.S. Army Engineer Division, Mediterranean, October 1961. Water Well
          Construction, Manual No. 7.

          U.S. Army Engineer Division, Pacific Ocean, 1975 and 1976. Memorandum
          of Understanding Between the Government of American Samoa and-the Corps
          of Engineers, Department of the Army for Real Estate, Engineering.Design
          and Construction Services (effective 5 September 1975), and Implementing
          Agreement for FY '76 Exploratory Well Drilling, 29 July 1976.

          U.S. Environmental Protection Agency, 1975. Manual of Water Well
          Construction Methods, EPA-570/9-75-001.

                                            B-36
<pb n="233" />

   a

                                               APPENDIX C
                                    REVIEW OF  EXISTING LITERATURE
<pb n="234" />

                    REVIEW OF EXISTING LITERATURE

                    A review of existing literature serves to provide a setting for this
                    report. It gives an idea of the problems and concerns that faced the
                    Department of Public Works during the development of the water system
                    and gives insight as to why certain courses of action were pursued.

                    The review will provide a bibliography which is as complete as possible
                    for future stud ies or engineering designs for the water system. It
                    will also help to identify areas in which data is lacking and more study

                    or data collection is required.

                    The literature review will be presented in nearly a chronological order
                    so that it will show a somewhat logical development of data as the water
                    system itself developed and expanded.

                    Literature Review:

                    1.   Report Covering A Master Planned Water Supply and Distribution
                         System for the Pago Pago and T@ifuna Areas, Austin, Smith &amp; Associ-
                         ates, Inc., February 1963.
                    This report noted the growing population and industrial growth in the
                    Pago Pago Harbor and Tafuna areas and pointed out the inability of
                    surface water sources to meet water demands. The report recommended
                    the construction of nearly seven million gallons of distribution and
                    raw water storage. It also recommended interconnecting the three Bay
                    Area water systems and providing slow sand filters and chlorination

                    to the surface water sources.

                    In an attempt to eliminate the complete dependence on stream flow,
                    the report recommended construction oftwo shallow wells and a more
                    detailed evaluation of the ground water potential of the Tafuna Plain.

                                                    C-1
<pb n="235" />

                    The authors noted a high per capita water consumption and estimated
                    that 40% of the water used was unnecessary or wasted.

                    2.    Water Supply and Distribution Systems Pago Pago and Tafuna Areas,
                          Austin, Smith &amp; Associates, Inc. April 1966.
                    This  report is an operations manual for the water system as improved
                    by construction under the recommendations of the 1963 report. In addi-
                    tion to system operation instructions, the report pointed out the neces-
                    sity of developing basal ground water supplies to insure a safe and
                    adequate water supply during low rainfall periods.

                    3.    Inventory of Village Water Systems in American Samoa, R.H. Dale,
                          U.S. Geological Survey, November 1970.
                    This report tabulates the estimated water demand, the presently deve-
                    loped supply, and the estimated availability of water for all villages
                    on Tutuila, American Samoa. The report is based upon limited data
                    obtained during a brief visit to each village during October of 1970.
                    Of necessity, much of the data is estimated and the results are reported
                    in a generalized manner.

                    4.    Report Covering Salt Water Fire Protection System, Roger L. Sinclair,
                          May 1971.
                    This  study investigated the existing Bay Area water system for its fire
                    protection capabilities. The report listed the following conclusions

                    and recommendations:

                          1.   Existing storage capacity of 5.25 million gallons in the Bay
                               Area is adequate if reservoirs are kept at least 30% full.
                          2.   The existing surface water sources are unreliable.
                          3.   The existing distribution system has been poorly operated
                               and as a result, large volumes of water are wasted and reser-
                               voirs can not be kept full.

                                                      C-2
<pb n="236" />

                        4.   The present schedule for improvements to the water system
                             will not provide adequate fire protection for at least three

                             years.
                        5.   The solution for immediate relief of the fire protection
                             problem is to utilize the vast quantity of salt water in Pago
                             Pago Bay.
                        6.   By designing the salt water system in accordance with the
                             water system master plan, the pipelines can be converted to
                             'the fresh water system when the fresh water system becomes

                             more reliable.

                   5.   Report Updatingthe 1963 Master Planned Water Supply and Distribution
                        System including the Leone Plan; Austin, Smith &amp; Associates, Inc.,
                        April 1972.
                   This report documented the tremendous population growth rate in the
                   Pago Pago Bay area and Tafuna Plain area from 1960 to 1970. Population
                   in these regions was growing at an annual average rate of 5.7%.

                   Water consumption had also increased because of the increasing popu-

                   lation and increased industrial activities. The 1990 demand in their
                   study area (which extended from Leone Village to Breakers Point) was
                   estimated at 7.8 million gallons per day.

                   The report noted that large volumes of water were currently lost due
                   to leakage and waste. It was estimated that the current consumption
                   could be reduced by 20% if the system was operated in an efficient and

                   businesslike manner.

                   Ground water was recommended as the most efficient way to meet water
                   shortages. The estimated yield from the Tafuna Plain was 5.5 million
                   gallons per day. When this ground water is combined with surface water,
                   it could easily meet the projected water demands.

                                                    C-3
<pb n="237" />

                    The report presented a five year, five million dollar capital improve-
                    ment program for the fiscal years 1973 through 1977. The program in-
                    cluded such items as 1) coftstruotion of wells, 2) installation of a
                    12-inch pipeline from Nuuuli to Fagaalu Village so that ground water
                    could be brought into the Bay Area, 3) increased water storage capacity,
                    4) treatment facilities for surface water sources, 5) expanded distri-
                    bution pipelines, and 6) improvements to the existing distribution
                    system and metering of water services to reduce water waste.

                    6.   Preliminary Report-Analysi3 of Vaipito and Faga'alu Water Treatment
                         Systems, The R.M. Towill Corporation, 1973.
                    See the following for final report recommendations.

                    7.   Final Report-Analysis of Vaipito and Faga'alu Water Treatment Systems,
                         R. M. Towill Corporation, June 1973.
                    The purpose of this report was to evaluate the water quality of the
                    existing streams feeding the Vaipito and Fagaalu Reservoirs to determine
                    the adequacy of the present water treatment system to efficiently treat
                    the water and to propose a means of improving finished water quality
                    by rehabilitating the filters. The conclusions and recommendations
                    were that the surface water supplies were not protected and were subject
                    to instantaneous changes in water quality and quantity. These varia-
                    tions in water quality and quantity make the utilization of these water
                    supply systems subject to close scrutiny to see whether they lend them-
                    selves to economical and practical management to insure a fail-safe
                    potable water supply. The abandonment, continuation or usage of these
                    systems as a backup should be determined by a master plan evaluation
                    of the water requirements and sources of supply. Consideration should
                    be given to abandoning these sources.

                    8.   Basis for Design - FY 74 Water System Expansion, R.M. Towill Cor-
                         poration, January 1974.

                                                    C-4
<pb n="238" />

                   Prepared to document the basis of the design of the FY 74 water system
                   expansion, this report contains the design criteria, reference reports
                   and design calculations.

                   It should be noted that the FY 74 construction package was considerably
                   changed by the Government of American Samoa prior to its inclusion as
                   part of the FY 75 improvement program.

                   9.    Analysis of Water Distribution System, The R.M. Towill Cc rporation,
                         not dated, estimated at January 1975.
                   This  report was prepared prior to the design of the fiscal year 1975
                   water system improvement program and was a consequence of the previous
                   surface water treatment study which cast serious doubts on the advisabi-
                   lity of continuing the use of the existing surface water sources.

                   The report's stated purpose was to analyze the existing water supply
                   system and to develop recommended improvements necessary to insure
                   that adequate water supply facilities will be available for the design
                   year 1990 in the water service area from the Tafuna well field to Aua.

                   The report gave the following concl  usions and recommendations:

                         1.   The well fields must be capable of delivering 6.9 million
                              gallons per day in 1990 to satisfy water demands.
                         2.   The existing booster stations are undersized to serve the
                              Bay Area if surface water supplies within the Bay Area are

                              not used.

                         3.   Inadequate records are maintained of the water system opera-

                              ting characteristics.
                         4.   No additional storage is required for peak hour equalizing
                              purposes, but fire storage is inadequate in the Tafuna area
                              and marginal in all others not protected by the salt water
                              fire protection system.

                                                    C-5
<pb n="239" />

                   10. Standard Specifications and Construction Details for the Water
                        Distribution System, R.M. Towill Corporation, November 1975.
                   The title of this document is self explanatory of its contents.
                   This document was intended to act as a standard document that would

                   reduce duplication in preparing water system construction documents.
                   The standards were also to provide guidance to government construction
                   and operations forces for their work on the water system.

                   11. Leak Detection Survey and Personnel Training, Gilbert Associates,
                        Inc., July 1974.
                   The work undertaken and covered in this report was to perform a.leak
                   survey of the government water system.

                   The survey discovered approximate ly 500,000 gallons per day in under-
                   ground leakage and surface service lateral water losses by wastage.
                   Generally the report found the system to be in fair condition, but in
                   need of more efficient operation with a good preventive and corrective
                   maintenance program. The report noted a complete lack of system opera-
                   ting records and construction standards. Metering of all individual

                   services was recommended to eliminate observed water waste.

                   12. A Report of Immediate Improvements to Water System, Tafuna Plains
                        to Pago Pago Harbor Area, CH2M - Hill, March 1975.
                   This report was prepared at the request of Governor Earl Ruth in response
                   to continued water shortages in American Samoa caused by record low
                   rainfalls in 1974. This report was used by the Governor at his funding
                   requests in Washington D.C. and contained recommendations for the use
                   of Olovalu Crater for surface water storage and treatment facilities.

                   Recommendations were made for 1) ground water investigation that would
                   determine the safe sustained yield of the Tafuna-Leone Plain, 2) geo-
                   technical investigations of the Olovalu Crater to determine its suitability

                                                   C-6
<pb n="240" />

                   for use as a storage reservoir and 3) improvements to the water trans-
                   mission system that would convey water from Olovalu Crater to the Bay
                   Area without booster pumping stations.    I

                   The report should be considered more of a proposal than a planning

                   document.

                   13. Inventory of the Economic Development Administration Village Water
                        System Program, URS/The Ken R. White Company, October 1975.
                   This report inventoried the status of the approximately 30 village water
                   systems that were being improved under a grant from the Economic Develop-
                   ment Administration. Through brief field visits, interviews with A.S.G.
                   and village officials and reviews of American Samoa Government documents,
                   the report attempted to determine: 1) which village had been completed
                   according to the original program criteria, 2) the present operating
                   condition of the systems and 3) if required, the additional work required
                   to make the system operational.

                   14.  Water System Study: Western Portion of Tutuila Island Including
                        A Proposed South Shore Master Plan, CH2M-Hill, November 1975.
                   When the A.S.G. proposed to take over the Leone water system in 1974,
                   part of the agreement with the chiefs was that they would have an indepen-
                   dent engineer recommend the required improvements.

                   The first section of this report is in response to that agreement.
                   It analyzes the water system requirements for the area from Amanave
                   to Futiga. Recommendations are based upon domestic, industrial and
                   fire flow requirements projected for the area. The report investigated
                   existing sources and recommended that wells in the Leone Area be used
                   only during the dry season as the supply was limited. The bulk of the
                   water sources were to be from the Asili, Leafu, and Fuafua stream basins.
                   The report recommended distribution and storage facilities.

                                                     C-7
<pb n="241" />

                    The second portion of this report was requested by Governor Ruth in
                    response to-continued dry weather and acute water shortages in Samoa.
                    A proposal was made for what is called the Olovalu Crater project.
                    The basic features of this proposal were that:

                         1.   The ground water supply on Tutuila Island is finite and may
                              be inadequate to meet total projected water requirements.
                         2.   Existing storage distribution and storage facilities are
                              inadequate to meet existing demands.
                         3.   Misuse and waste of water is a common practice. A universal
                              system of metering should be installed immediately.
                         4.   A large volume (560 million gallons) storage reservoir created
                              within Olovalu crater would eliminate water shortages to the
                              design year 2010 and help to preserve the ground water lens.
                         5.   Surface water supply to the crater would be from the Asili,

                              Leafu and Fuafua streams.
                         6.   All treatment of surface sources would be at a central point
                              at the crater and transmission to the Bay Area would be by
                              high pressure gravity flow in large diameter pipelines.

                    16. Ground Water Resources of American Samoa with Emphasis on the
                         Tafuna-Leone Plain, Tutuila Island, Bentley C.B., USGS Water Re-
                         sources Investigation Report No. 29-75, 1975.
                    This is a summary of the available ground water data for the islands
                    of American Samoa. Includes hydrogeology, descriptions of occurrences
                    of the ground water, the aquifer and well production characteristics
                    and discussions of the future development of ground water.   The safe
                    yeild for the Tafuna Plain was estimated at 30,000 acre feet or 26.6

                    MGD.

                                                   c-8
<pb n="242" />

                   17. Public Works Role in Developing American Samoa, Sinagege Randorf
                        Morris, 1976.

                   Submitted as a part of the requirements for a Master of Public Works
                   Degree, Mr. Morris presents a brief historical background of American
                   Samoa, a review of the Department of Public Works' organizational struc-
                   ture and responsibilities and recommendations for reorganization.

                   Based upon the author's first hand experience as a management employee
                   in the Department of Public Works for many years, recommendations are
                   given to improve the operational abilities and efficiency of the depart-

                   ment.

                   Recognizing the importance of water to economic growth and health, a
                   recommendation is made for creation of a water and power authority so
                   that the utilities will operate on a businesslike basis separate from
                   the Department of Public Works.

                   18. The Effect of the Safe Drinking Water Act on American Samoa, Abe
                        Utu Malae, 1976.
                   Submitted in partial fulfillment of the requirements for a masters
                   degree, this study addresses the costs and benefits that will accrue
                   from implementation of the Safe Drinking Water Act of 1974 as well as
                   Water Quality Monitoring Requirements. It also examines the constraints
                   (administrative, personnel, and legal) that are peculiar to American

                   Samoa and will affect the administration and enforcement of the act.

                   19. American Samoa's Water System Improvement Program, Mattew J. Flanagan,
                        April 1976.
                   This paper was prepared for presentation to the 1976 American Water
                   Works Association meeting in Honolulu. The paper contains a short
                   history of Samoa Water System Improvements and explains the basis of

                                                   C-9
<pb n="243" />

                   the improvement program that is presently underway. The design popu-
                   lations and flow rates that ar e the basis for the design of current
                   improvement programs are shown.

                   20. Disinfection of Ground Water Supplies - Predesign Study, CH2MHill,
                        May 13, 1977.
                   The scope of this study included data collection on operation of exist-
                   ing wells, field analysis of well water to determine chlorine demand,
                   evaluation of alternate chlorination equipment for use in Samoa, and
                   the preparation of a report summarizing the findings.

                                                  C-10
<pb n="244" />

                                                                : 1111011111INIIIII     1
                                                                   3 6668 14102 8367 -  I
</text>
</doc>
