<?xml version="1.0" encoding="iso-8859-1" ?>
<doc callnum="TC365 .O98 1981">
<metadata>
	<titleStmt>
		<mainTitle nfc="0"><title>Outline technical specifications of preliminary engineering, Davisville port expansion.</title></mainTitle>
		<titleVariant><title>Rhode Island Port Authority and Economic Development Corporation</title></titleVariant>
		<titleVariant type="cover"><title>Technical specifications of preliminary engineering, Davisville port expansion</title></titleVariant>
	</titleStmt>
	<authorStmt>
		<corpAuthor><name>Rhode Island Port Authority and Economic Development Corporation.</name></corpAuthor>
		<corpAuthor><name>CE Maguire, inc.</name></corpAuthor>
	</authorStmt>
	<imprint><pubPlace>Providence, R.I.</pubPlace>:<pubName>CE Maguire</pubName>,<pubDate>1981.</pubDate></imprint>
	<classStmt>
		<locClass>
			<subject cat="top">Harbors</subject>
			<subject cat="gen">Specifications</subject>
			<subject cat="geo">Rhode Island</subject>
			<subject cat="geo">Davisville.</subject>
		</locClass>
		<locClass>
			<subject cat="geo">Davisville (R.I.)</subject>
			<subject cat="gen">Specifications.</subject>
		</locClass>
	</classStmt>
</metadata>

<text xml:space="preserve">
<pb n="1" />

                   TECHNICAL SPECIFICATIONS

    DAVISVIL

 JANUARY, 1991

                            TC
                            365
                            .098

                            1981

                                                                                                                   Prepared for
                                                                                                                   PHD ISLAND
                                                                                                                   ECONOMY DEVELOPMENT COMMUNITY
<pb n="2" />

                              RHODE ISLAND PORT AUTHORITY AND

                              ECONOMIC DEVELOPMENT CORPORATION

                               OUTLINE TECHNICAL SPECIFICATIONS

                                                  OF

                                     PRELIMINARY ENGINEERING

                                   DAVISVILLE PORT EXPANSION

                                           JANUARY, 1981
          40

                                         CE MAGUIRE, INC.
                                          31 CANAL STREET
                                    PROVIDENCE, RHODE ISLAND

                                           US Department of Commerce
                                         OAA Coast"I services Center LibrarY
                                       N1         1
                                             2234 E,@Utja 00bson Avenue
                                             Charleston, SC 29405-2413

               The preparation of this report was financed in part by funds from the
               Office of Coastal Zone Management, National Ocean and Atmospheric
               Administration) U.S. Department of Commerce, administered by the
               ENERGY OFFICE, EXECUTIVE DEPARTMENT, GOVERNOR'S OFFICE, STATE OF RHODE
               ISLAND.
<pb n="3" />

                               INDEX TO TECHNICAL SPECIFICATIONS

                SECTION                                      TITLE

                02050                                    DEMOLITION

                02110                                    CLEARING AND GRUBBING

                02113                                    STRIPPING AND STOCKPILING

                02200                                    EARTHWORK

                02211                                    ROCK REMOVAL

                02271                                    RIP RAP

                02278                                    FILTER CLOTH

                02369                                    STEEL SHEETPILE BULKHEAD

                02380                                    EXCAVATION SUPPORT SYSTEMS

                02401                                    DEWATERING AND CONTROL OF WATER

                02444                                    CHAIN LINK FENCES

                02500                                    BITUMINOUS PAVING AND PATCHING

                02718                                    DOMESTIC AND FIRE WATER SERVICE

                02721                                    STORM DRAINAGE SYSTEMS

                02722                                    SANITARY SEWER

                02819                                    LOAMING AND SEEDING

                02850                                    RAILROAD WORK

                02881                                    DREDGING

                02882                                    FENDERS, BOLLARDS AND CLEATS

                03300                                    CAST-IN-PLACE CONCRETE

                16050                                    ELECTRICAL SERVICE
<pb n="4" />

                SECTION 02050 - DEMOLITION

                PART 1. 00 - GENERAL

                1.01 DESCRIPTION

                     A. Work Included:

                          Demolition required for this work includes, but is not
                          necessarily limited to:

                          1 .  Removal of concrete and bituminous pavement and
                               concrete walls.

                          2.   Stripping and stockpiling of all topsoil material.

                          3.   Removal of existing structures including walls, roofs,
                               floors, doors, windows, iriterior partitions, founda-
                               tions, ceilings, heating and ventilating, piping, and
                               electrical complete.

                          4.   Removal of all debris.

                          .5.  Disposal of all materials off site.

                PART 2.00 - MATERIAL

                2. 01 MATERIALS

                     All materials, not specifically described but required for proper
                     completion of the work of this section, shall be as selected by
                     the Contractor and approved by the Contracting Officer.

                PART 3.00 - EXECUTION

                3.01 Work Included:

                     Will consist of the removal of all specified materials to the lines
                     and grades as shown on the Contract drawings or as specified in
                     the contract documents.

                                           END OF SECTION

                                              02050-1
<pb n="5" />

               SECTION 02110 - CLEARING AND GRUBBING

               PART 1. 00 - GENERAL

               1.01 DESCRIPTION:

                     A.   Work Included:

                          The work covered under this Section includes the fur-
                          nishing of all labor, equipment and materials, and per-
                          forming all operations in connection with the clearing and
                          grubbing and the preparation of the site within the limits of
                          the construction shown on the drawings. The work also
                          includes the disposal off the site of materials resulting from
                          clearing and grubbing and site preparation operations, and
                          all appurtenant work, complete in accordance with the
                          specifications and the drawings, and as directed.

                     B .  Related Work Specified Elsewhere:

                          1.   Stripping, Stockpiling and
                               Replacing Topsoil                          Section 02113

                          2.   Earthwork                                  Section 02200

               PART 2.00 - EXECUTION

               2. 01 CLEARING:

                     A .  Clearing:

                          Clearing shall include the felling and cutting up of all
                          trees, and the satisfactory removal and disposal of trees,
                          downed timber, brush and debris and obstructions of any
                          nature. Individual trees directed to be left standing shall
                          be protected in a satisfactory manner to prevent damage
                          incident to construction operations.

               2.02 GRUBBING:

                     A.   Grubbing:

                          Grubbing shall include the satisfactory removal and disposal
                          of all stumps, roots larger than one inch in diameter,
                          matted roots, debris and other obstructions to a depth not
                          less than 18 inches below finish grades, except that in
                          areas to be occupied by structures they shall be removed in
                          their entirety.   All depressions resulting from grubbing
                          shall be refilled with selected materials from earth excava-
                          tion, graded and compacted so as to conform to adjacent
                          ground surfaces.

                                              02110-1
<pb n="6" />

             2.03 DISPOSAL OF CLEARED AND GRUBBED MATERIAL:

                  A.   Disposal of Cleared and Grubbed Material:

                       All timber, stumps, roots, brush, and other debris, ob-
                       structions and objectionable material resulting from clearing
                       and grubbing and site preparation operations shall be
                       removed and disposed of by the Contractor off the site.
                       Disposal by burning or burying on the site will not be
                       permitted.

                                      END OF SECTION

                                         02110-2
<pb n="7" />

               SECTION 02113 - STRIPPING, STOCKPILING &amp; REPLACING TOPSOIL

               PART 1.00 - GENERAL

               1.01 DESCRIPTION

                    A.    The work covered under this Section includes the fur-
                          nishing of all labor, equipment and materials and performing
                          all operations in connection with the stripping, stockpiling
                          and replacing of topsoil within the limits of the areas as
                          indicated or directed, completed and accepted, in accord-
                          ance with the drawings and specifications. The work shall
                          also include all hauling, handling and rehandling of topsoil,
                          maintaining and protecting of stockpiled topsoil; preparation
                          of subgrades; spreading; compacting, grading and replacing
                          deficiencies in quantities of topsoil; protection of completed
                          topsoiled areas; and all other work incidental and necessary
                          for the satisfactory completion of this Section.

                    B.    Related Work Specified Elsewhere:

                             1.   Clearing and Grubbing               Section 02110

                             2.   Earthwork                           Section 02200

                             3.   Landscaping                         Section 02480

               PART 2.00 - EXECUTION

               2. 01 STRIPPING:

                     A.- Procedure:

                          1.   Topsoil shall be carefully removed to the depths and
                               within the limits indicated or directed for removal.
                               Topsoil shall be transported and deposited in storage
                               piles in approved locations convenient to the areas
                               from which it is removed.

                                           END OF SECTION

                                              02113-1
<pb n="8" />

               SECTION 02200 - EARTHWORK

               PART 1. 00 - GENERAL

               1.01 DESCRIPTION

                    A.    Work Included:

                          The work under this Section includes the furnishing of all
                          labor, equipment and materials, and performing all op-
                          erations in connection with excavating, backfilling, compact-
                          ing, grading and all other incidental work necessary for the
                          construction of pipelines, structures, pavement and appurt-
                          enant work in accordance with the drawings and specifica-
                          tions and as directed. The work also includes installing,
                          shoring and bracing as the excavation proceeds; providing
                          approved earth borrow, sand and bank-run gravel from
                          off-site sources when directed for backfills of excavations
                          and refills of below-grade excavations; excavation and
                          disposal at approved locations of pavements, surplus and
                          unsuitable materials; protection of existing pipelines; utili-
                          ties and structures and of new work; compaction of trench
                          bottom, backfills and subgrades; excavation and backfilling
                          of test pits; and all other appurtenant work as required or
                          as directed.

               PART 2.00 - PRODUCTS

               2.01 MATERIALS

                    A.    Earth Borrow:

                          Earth borrow shall be a well-graded granular material, of
                          which at least 80 percent by weight shall be retained on the
                          No. 200 sieve. It shall be free from peat, organic matter
                          and debris, and shall not contain any stones or clay lumps
                          in excess of 8 inches in their greatest dimensions. Any
                          materials of whatever description which are too uniformly-
                          graded or saturated to be readily compactible shall not be
                          utilized for earth borrow.

                    B .   Bank-Run Gravel

                          Bank-run gravel shall be composed of hard, durable stone
                          and coarse to fine sand, free of peat, vegetable or organic
                          matter, clay lumps and any other debris. The gravel refill
                          shall be readily compactible and shall not contain any stones
                          that are in excess of two thirds (2/3) of the depth of the
                          layer to be compacted. Bank-run gravel shall conform to
                          the following gradation requirements:

                                              02200-1
<pb n="9" />

                           U.S. Standard                       Percent Passing
                             Sieve Size                          By  Weight

                                  1 Inch                             55-100
                                  No. 4                              20-95
                                  No. 40                              0-50
                                  No. 200                             0-5

                     C.    Gravel Bedding:

                           Gravel for pipe bedding shall be provided from off-site
                           sources in the quantities required for completion of the
                           work and shall be as approved by the Owner. Gravel
                           bedding shall consist of clean, hard and durable particles
                           or fragments and shall be free from clay, organic matter
                           and other objectionable material.      Gravel bedding shall
                           consist. of approved 3/4 inch crushed stone or shall consist
                           of gravel conforming to the following gradation limits:

                           U. S. Standard                       Percentage Passing
                             Sieve Size                             By Weight

                             3/4  inch                              100
                             3/8  inch                              50-85
                             No.  4                                 25-70
                             No. 10                                 10-35
                             No.  40                                 0-10
                             No.  100                                0-5

                     D.    Sand:

                           Sand   shall be provided by the Contractor from sources
                           outside the Owner's property in the quantities required
                           for completion of the work and of the quality specified
                           and approved. Sand shall consist of clean, hard, dur-
                           able particles or fragments of crushed or uncrushed
                           gravel and shall be free from lumps of clay, organic
                           matter or other objectionable material. Sand shall con-
                           form to the following requirements:

                           U. S. Standard                  Percent Passing
                             Sieve Size                      By Weight

                           3/8 inch                             100
                           No. 4                                 95-100
                           No. 10                                65-95
                           No. 40                                20-45
                           No. 100                                 0-10

                      E.   Ballast:

                           Ballast for railroad bedding shall be provided from off-site
                           sources in the quantities required for completion of the

                                                02200-2
<pb n="10" />

                            work and shall be as approved by the Owner. Ballasts
                            shall consist of clean hard durable particles or fragments
                            and shall be free from clay, organic matter and other
                            objectionable material.

                            U. S. Standard                         Percentage Passing
                              Sieve Size                                 By Weight

                                  3 inch                                 100
                                  2h inch                                 90-100
                                  2 inch                                  80-95
                                  1k inch                                 35-70
                                  1 inch                                  20-55
                                  3/4 inch                                  0-15

                 PART 3.00 - EXECUTION

                 3. 01 EXCAVATION:

                      A .   General:

                            1 .   Earth excavation shall include the excavation, removal
                                  and satisfactory disposa   'I of all materials of whatever
                                  nature encountered from within the limits indicated or
                                  specified, or as directed in writing, other than rock
                                  or ledge as defined under Section entitled "ROCK
                                  REMOVAL". It shall include but not be limited to
                                  earth materials such as peat, organic or inorganic silt,
                                  clay,   sand and gravel; pavements; cobbles and
                                  boulders less than 1 cubic yard in volume; soft or
                                  disintegrated rock which, in the opinion of the Owner,
                                  can be removed without blasting or drilling; brick and
                                  concrete masonry; and all obstructions not specifically
                                  included in another Section.

                                              END OF SECTION

                                                  02200-3
<pb n="11" />

               SECTION 02211 - ROCK REMOVAL

               PART 1. 00 - GENERAL

               1.01 DESCRIPTION:

                    A.   Work included:

                         The work covered under this Section includes the fur-
                         nishing of all labor, equipment and materials, and per-
                         forming all operations in connection with rock excavation
                         and subsequent earth backfill within the payment lines for
                         excavation as indicated on the drawings, and all incidental
                         work in accordance with the drawings and specifications,
                         and as directed. The work shall also include providing and
                         compacting gravel bedding from off-site sources for refilling
                         depressions resulting from removal of boulders; the satis-
                         factory removal and disposal of the excavated rock mate-
                         rials; and the protection of existing pipelines, structures
                         and appurtenant facilities, and the contract work.

               PART 2. 00   GENERAL

               2-01 ROCK EXCAVATION:

                    A .  Procedure:

                         1 .   Rock excavation shall include the excavation, removal
                               and disposal of all boulders and detached rock frag-
                               ments 1 cubic yard or more in volume; and all ledge
                               rock, the removal of which, in the opinion of the
                               Owner, can be accomplished only by drilling and
                               splitting mechanically or by hand or by blasting.
                               Boulders of less than 1 cubic yard in volume, and all
                               soft or disintegrated rock which can be removed with-
                               out the manipulation noted above, shall be classified as
                               "earth excavation".

                                          END OF SECTION

                                              02211-1
<pb n="12" />

               SECTION 02271 - RIPRAP

               PART 1. 00 - GENERAL

               1.01 WORK INCLUDED:

                    The work covered under this Section consists of the furnishing
                    of all materials as specified, plant, labor, and equipment, and
                    performing all operations in connection with the furnishing and
                    placing of stone riprap.   All shall be in accordance with the
                    Contract Drawings and as hereinafter specified.

               PART 2.00 - MATERIALS

               2. 01 GENERAL

                    Stone riprap material shall be furnished by the Contractor from
                    approved sources. The materials for use as riprap shall consist
                    of quarried rock composed of hard, durable, angular and sound
                    rock f ragments.

               PART 3.00 - EXECUTION

               3. 01 GENERAL

                    Stone riprap shall be placed to the lines and grades as shown on
                    the Contract Drawings and as specified.

                                         END OF SECTION

                                            02271-1
<pb n="13" />

                SECTION 02278 - FILTER, CLOTH

                PART 1.00 - WORK INCLUDED

                      The work covered by this Section consists of furnishing all
                      plant, labor and equipment and performing all operations in
                      connection with the placement and securing of all filter fabric,
                      complete, in place, in accordance with the Contract documents.

                PART 2.00 - MATERIALS

                2.01 FILTER CLOTH

                      A.   The plastic filter cloth shall be a pervious sheet woven of
                           polypropylene monofilament yarns.       Filter cloth shall be
                           Poly-Filter X as manufactured by Carthage Mills, Cincin-
                           nati, Ohio; Monofilter as manufactured by United States
                           Filter Corporation, Houston, Texas; or an approved equal.
                           To satisfy the requirements of this specification, the type
                           of plastic filter cloth used must have a service record of
                           not less than 5 years in projects of a generally similar
                           nature.

                      B.   Mill Certificate:

                           A mill certificate must be provided by the manufacturer that
                           the filter cloth to be supplied conforms to -these specifica-
                           tions.

                      C.   Filter Cloth shall be made of a yarn consisting by weight of
                           at least 85 percent propylene ethylene or vinylidene -
                           chloride and contain stabilizers and inhibitors added to the
                           base plastic to make the filaments resistant to ultra-violet
                           and heat deterioration. After weaving, the cloth shall be
                           calendered -and palmered so that the filaments retain their
                           relative positions with respect to each other.    All edges of
                           the cloth shall be salvaged and/or serged. The plastic
                           filter shall be free of defects or flaws which significantly
                           affect its physical and/or filtering properties.   A competent
                           laboratory must be maintained by the producer      of the cloth
                           at the point of manufacture to insure quality control.

                PART 3.00 - EXECUTION

                3. 01 GENERAL

                      A .  The filter cloth shall be placed in the manner and at the
                           locations indicated on the drawings. The surface to receive
                           the cloth shall be prepared to a smooth condition, free of
                           obstructions, depressions and debris as specified and
                           directed. The cloth may be placed with the long dimension
                           either perpendicular or parallel to the slope as approved.

                                            END OF SECTION

                                                02278-1
<pb n="14" />

                SECTION 02369 - STEEL SHEET PILING SYSTEM

                PART 1.00 - GENERAL

                1.01 WORK INCLUDED:

                     The work covered under this Section consists of the furnishing
                     of all materials, plant, labor and equipment, and performing all
                     operations in connection with the furnishing and construction of
                     a steel sheet piling system. All shall be in accordance with the
                     Contract Drawings and as herein specified.

                PART 2.00 - MATERIALS

                2.01 Structural steel tie rods, wales, bolts,' accessory materials and
                     plate washers shall conform to ASTM A-36. Welding electrods
                     shall be E70XX. Protective coatings shall be in accordance with
                     the Protective Coatings Section of these Specifications.

                2.02 Turnbuckles shall conform to ASTM A-668 and shall be normal-
                     ized and tempered and shall have a yield point of not less than
                     40,000 psi. Weights and dimensions shall be as shown in the
                     Cleveland City Forge Co. Standard.

                2.03 Sheet Piling:

                     Steel sheeting piling shall be manufactured from a steel possess-
                     ing improved corrosion resistance to marine environments, having
                     a guaranteed minimum yield point of 50,000 pounds per square
                     inch and shall conform to ASTM A 690-77 steel sheet piling shall
                     be of the continuous inter-lock type of approved form.

                PART 3.00 - EXECUTION

                3. 01 GENERAL

                     Unless otherwise directed, piles shall be driven to the tip eleva-
                     tion shown. If a pile fails to reach the indicated tip elevation,
                     corrective measures shall be applied as recommended by the
                     Owner or his representative. Adequate guide wales shall be
                     provided to align the piles properly. Piles shall be spaced
                     accurately and driven true and plumb to a tolerance from the
                     vertical of not more than 0.25 inches per foot of pile length - At
                     completion of driving, tops of piles shall be within 3 inches of
                     the location indicated. Manipulation of piles to force them into
                     proper position shall not be permitted.       Sequence of driving
                     shall be such that no pile is advanced f arther than three feet
                     below the adjacent pile. Jetting of piles will not be permitted.
                     Piles damaged during driving shall be withdrawn and replaced
                     and all costs associated therewith shall be borne by the Con-
                     tractor.

                                           END OF SECTION

                                               02369-1
<pb n="15" />

                SECTION 02380 - EXCAVATION SUPPORT SYSTEMS

                PART 1. 00 - GENERAL

                101 DESCRIPTION:

                     A    Work Included:

                          The work covered under this Section includes the fur-
                          nishing of all labor, equipment and materials and performing
                          all operations in connection with the furnishing, installa-
                          tion, maintenance and removal of all timber sheeting and
                          bracing and all temporary and permanent steel sheeting and
                          bracing necessary to permit the proper and satisfactory
                          installation and construction of the work; to prevent in-
                          jurious caving or erosion, or loss of ground, to maintain at
                          all times pedestrian, vehicular and railroad traffic on public
                          and private streets, property and rights-of-way; or where
                          shown on the drawings, necessary for unforseen reasons,
                          or where directed by the Owner, and all in accordance with
                          the specifications and the drawings and as directed.

                PART 2.00 - PRODUCTS

                2. 01 MATERIALS:

                     A .  Timber sheeting and bracing:

                          Timber sheeting and bracing may be of any species of wood
                          which will satisfactorily withstand all driving and construc-
                          tion stresses and the loads to which the members will be
                          subjected. Sheeting shall not be less than 3 inches nominal
                          thickness. All timber sheeting and bracing shall be free
                          from wormholes, windshakes, loose knots, decayed or un-
                          sound portions or other defects which might impair its
                          strength or tightness.

                     B .  Steel Sheeting:

                          The shapes, sizes, and lengths of steel sheeting to be
                          utilized are optional with the Contractor, providing they are
                          satisfactory to withstand all driving and construction
                          stresses and are driven in continuous interlock. Bracing
                          and other supports whether of steel or of timber, shall be
                          of the strength and dimensions necessary to satisfactorily
                          withstand the loads to which they will be subjected. All
                          bracing and other supports shall be free from any defects
                          which might impair this strength.

                     C.   Hardware and Fastenings:

                          The Contractor shall provide all necessary hardware and
                          fastenings necessary in connection with satisfactory install-
                          ation of all sheeting and bracing.

                                               02380-1
<pb n="16" />

               PART 3.00 - EXECUTION

               3.01 INSTALLATION AND REMOVAL:

                    A.   Installation:

                         1.   Sheeting and bracing shall be of sufficient strength to
                              safely sustain all loads from the sides of the excava-
                              tions together with all water pressure and reasonable
                              surcharge. The Contractor shall at all times be en-
                              tirely responsible for adequacy of sheeting and bracing
                              used to permit the satisfactory and safe installation
                              and construction of the work, to provide adequate
                              protection against damage to all existing utilities,
                              structures and complete portions of the work, and to
                              prevent injury to persons.

                                         END OF SECTION

                                             02380-2
<pb n="17" />

              SECTION 02401 - DEWATERING, CONTROL AND DIVERSION
                                OF WATER

              PART 1. 00 - GENERAL

              1.01 DESCRIPTION:

                   A.   Work included:

                        The work covered under this Section includes the fur-
                        nishing of all labor, equipment and materials, and per-
                        forming all operations in connection with the dewatering,
                        control and diversion of water, and all other operations
                        necessary to maintain in the dry condition all excavations
                        and work areas of this contract. The Contractor shall be
                        responsible for providing, maintaining, operating and re-
                        moving all dewatering, and other facilities, including all
                        pumping and appurtenant equipment, required to maintain
                        in a dry condition the areas in which -construction of this
                        contract is to be conducted.      The Contractor shall be
                        responsible for performing all required dewatering in a
                        manner to prevent injury to persons or public health and
                        damage to existing facilities or the work in progress.

              PART 2.00 - EXECUTION

              2.01 DEWATERING EXCAVATIONS:

                   A.   Procedure:

                        1.   The excavations for work required under this contract
                             are to some extent below existing ground water levels.
                             The Contractor shall provide, operate and maintain all
                             pumps, drains, well points or any equipment necessary
                             for the control, collection and disposal of all surface
                             and subsurface water encountered in the performance
                             of the contract work.

                                         END OF SECTION

                                            02401-1
<pb n="18" />

               SECTION 02444 - CHAIN-LINK FENCING

               PART 1. 00 - GENERAL

               1. 01 DESCRIPTION

                     A. Work Included:

                          Chain-link fencing described in this Section includes fenc-
                          ing, concrete, all hardware and installation complete in
                          place as indicated on the Drawings.

                          1 .  Six-foot high PVC coated chain-link fencing.

                     B .  Related Work Described Elsewhere:

                          1 .  Cast-in-Place Concrete            Section 03300

               PART 2.00 - PRODUCTS

               2. 00 - GENERAL

               2.01 GALVANIZED FENCING

                     A .  Posts for Six-foot Fencing:

                          1 .  Line posts shall be heavy hot-dip galvanized steel pipe
                               having an outside diameter of 2 inches and shall weigh
                               2.72 pounds per linear foot respectively.

                          2.   End, corner and pull posts shall be heavy hot-dip gal-
                               vanized steel pipe having an outside diameter of 2-1/2
                               inches and shall weight 3.65 pounds per linear foot.

                     B.   Top  and Brace Rails:

                          Top  and brace rails shall be heavy hot-dip galvanized steel
                          pipe having an outside diameter of 1-5/8 inches and weigh-
                          ing 2.27 pounds per linear foot.

                     C.   Diagonal Braces:

                          Diagonal braces (truss rods) shall be hot-dip zinc-coated
                          steel, 1/2 inch diameter.

                     D.   Fence Fabric:

                          Fence fabric shall be grey colored PVC coated 9-gauge pre-
                          galvanized wire interwoven into a 3-inch by 5-inch mesh.

                     E.   Fence Hardware:

                          1.   Line posts shall have cast semi-steel loop caps.

                                             02444-1
<pb n="19" />

                          2.   End, corner, and pull posts shall have malleable iron
                               hot-dip galvanized post tops.

                          3.   Top and brace rail hardware shall include hot-dip
                               galvanized self-centering outside sleeve type couplings
                               at least seven inches long, heavy hot-dip galvanized
                               steel brace bands, and malleable iron rail end connec-
                               tions.

                          4.   Fabric attachment hardware shall include 1@4-inch thick
                               by 3/4-inch wide by full height galvanized steel
                               stretcher bars, stretcher bar bands, 7 gauge galvan-
                               ized coil spring tension wire, and 6 gauge zinc-coated
                               wire hot ties at 14-inch intervals.

                          5.   Diagonal brace (truss rod) hardware shall include
                               heavy malleable iron hot-dip galvanized tightener and
                               brace band.

               PART 3.00 - EkECUTION

               3.01 INSTALLATION

                    Install all chain-link fencing in strict accordance with all per-
                    tinent codes and regulations, the original design, the approved
                    Shop Drawings, and the manufacturer's current recommendations,
                    anchoring all components firmly into position for long life under
                    hard use.

                    A.    Alignment and Grade:

                          Fencing shall be installed to the alignment and grades in-
                          dicated or directed. Fencing shall follow the general con-
                          tour of the finished ground grade or the top of walls,
                          unless otherwise indicated or directed.

                    B.    Post Spacing:

                          Line posts shall be spaced equidistant in the fence line on a
                          maximum of 10-foot centers. Posts shall be plumb and the
                          tops of the posts properly aligned.

                    C.    Post Setting:

                          1.   Posts at grade shall be set in concrete footings with
                               the top exposed surface sloped to shed water. Line
M                              posts shall be set not less than 36 inches deep in
                               concrete footings having a depth of 39 inches and a
                               diameter of 12 inches. Terminal, corner, gate and pull
                               post footings shall be 18 inches in diameter.

                                           END OF SECTION

                                              02444-2
<pb n="20" />

               SECTION 02500 - -BITUMINOUS PAVING AND PATCHING

               PART 1.00 - GENERAL

               1.01 - DESCRIPTION

                    A.   Work Included:

                         The work of installing bituminous concrete for road and
                         walk pavements and patching includes, but is not neces-
                         sarily limited to:

                         I .  Saw cutting.

                         2.   Preparation of subbase.

                         3.   Installing and compacting gravel base material.

                         4.   Bituminous concrete paving materials.

                    B.   Related work described elsewhere:

                         1.   Earthwork                          Section 02200

                         2.   Demolition                         Section 02050

                    C.   References,

                         Within this section, the State of Rhode Island Standard
                         Specifications for Road and Bridge Construction Revision of
                         1971 with changes will be referred to as the "State Stan-
                         dards". All reference to measurement and payment within
                         said "State Standards" shall not apply.

               PART 2.00 - PRODUCTS

               2.01 - SUBGRADE MATERIAL

                    Subgrade fills and refills shall consist of approved on-site mate-
                    rials conforming to the requirements of Section 02200.

               2.02 - SUBBASE MATERIAL

                    The subbase material shall conform to the requirements of
                    Section 02200.

               2.03 - BITUMINOUS CONCRETE PAVEMENT MATERIALS

                    The materials for the bituminous concrete mixture, the sources
                    of supply, formula for mix, mix tolerances, approval of mix
                    formula, and the control of the mixture shall conform to the
                    requirements of Section M. 03 of the "State Standards.

                                             02500-1
<pb n="21" />

               2.04 - OTHER MATERIALS

                    All other materials, not specifically described but required for
                    proper and complete installation of bituminous concrete pavement,
                    shall be as selected by the Contractor subject to the approval of
                    the Owner.

               PART 3.00 - EXECUTION

               3.01 - SURFACE CONDITIONS

                    A.   Inspection:

                         1.   The Contractor shall perform and complete the con-
                              struction work within the limits indicated in a con-
                              tinuous manner and so that the pavement replacement
                              work may proceed without delay.

                         2.   The work consisting of trench patching and road and
                              walk paving shall be"performed to details indicated and
                              as specified.

                         3.   Existing pavements, outside of the indicated pavement
                              limits, which are damaged as a result of the Contrac-
                              tor's operations, shall be replaced including base
                              courses, bituminous tack coats where directed and
                              surface courses, by the Contractor, in accordance with
                              the requirements specified herein for the respective
                              type of pavement and in a manner satisfactory to the
                              Owner and at no additional expense to the Owner.

                                          END OF SECTION

                                             02500-2
<pb n="22" />

               SECTION 02718 - DOMESTIC AND FIRE WATER SERVICE

               PART 1.00 - GENERAL

               1.01 DESCRIPTION

                    A. Work Included:

                         The work covered under this Section includes, but is not
                         necessarily limited to:

                         1.   Installing and testing ductile iron and type "KII copper
                              water pipe fittings, valves and all appurtenant items.

                         2.   Installing corporation stops, tapping sleeves, valves,
                              boxes and hydrants.

                         3.   Installing miscellaneous@ metal for strapping, piping,
                              and accessories.

                         4.   Installing cement-concrete for thrust blocks.

                         5.   Disinfection.

                         6.   Obtaining permits.

                    B .  Related Work Described Elsewhere:

                         1.   Earthwork                         Section 02200

                         2.   Bituminous Paving &amp; Patching         Section 02500

               PART 2.00 - EXECUTION

               2.01 GENERAL REQUIREMENTS

                    Piping for water mains, water services and appurtenances shall
                    be. of the types and materials specified herein. The pipe, fit-
                    tings, special accessories and appurtenances shall be new and
                    unused, and as approved. The interior of the pipe shall be
                    thoroughly cleaned of all foreign matter before being lowered
                    into the trench, and shall be kept clean during laying operations
                    by plugging or other approved method. The full-length of each
                    section of piping shall rest solidly upon the pipe bed, with
                    recesses excavated to accommodate bells and joints. Any pipe
                    that has the grade or joint disturbed after laying shall be taken
                    up and relaid. Pipe shall not be laid in water, or when trench
                    or weather conditions are unsuitable for the work, except by
                    permission of the Owner.    Water shall be kept out of the trench
                    until the joints have been  completed. Any section of pipe found
                    to be defective before or   after laying shall be replaced by the
                    Contractor with sound pipe without additional expense to the
                    Owner. All bends, tees and other locations indicated or directed
                    shall be firmly reinforced with concrete thrust blocks of the size

                                             02718-1
<pb n="23" />

                    and shape indicated and as directed, and strapped where re-
                    quired, to prevent the pipe, pipe fittings and appurtenances
                    from being blown off the lines under pressure. Where connec-
                    tions are made between new and existing work, the connections
                    shall be made using the specials and fittings specified as indica-
                    ted or as required.      All connections between new work and
                    existing work shall only be made at such times and in a manner
                    approved by the Owner. Approximate locations of connections
                    between new and existing work are shown on the Drawings, the
                    exact location shall be as directed by the Owner. The Contrac-
                    tor shall make the necessary excavations as directed to uncover
                    existing work for the purpose of determining the exact locations
                    for all connections of new work to existing work.

                                          END OF SECTION

                                              02718-2
<pb n="24" />

               SECTION 02721 - STORM DRAINAGE SYSTEMS

               PART 1. 00 - GENERAL

               1.01 DESCRIPTION

                    A.   Work Included:

                         The storm drainage system installations are indicated on the
                         drawings and include, but are not necessarily limited to:

                         1.   Reinforced concrete pipe and appurtenances

                         2.   Catch basins, manholes, frames and grates

                    B.   Related Work Described Elsewhere:

                         1.   Earthwork                              Section 02200

                         2.   Rock Removal                           Section 02211

                         3.   Cast-in-Place                          Section 03300

               PART 2.00 - MATERIALS

               2. 01 GENERAL

                    All reinforced concrete pipe, catch basins, manholes and ap-
                    purtenances shall conform to Section M.04 of the State of Rhode
                    Island Standard Specifications.

               PART 3.00 - EXECUTION

               3. 01 GENERAL

                    After the trenching and excavation has been completed as speci-
                    fied in Section 02200 of these specifications, the catch basins,
                    manholds and drainage pipe shown on the contract drawings shall
                    be installed in conformance with the methods outlined in Section
                    701 of the State Standards.

                                          END OF SECTION

                                             02721-1
<pb n="25" />

               SECTION 02722 - SANITARY SEWER

               PART 1. 00 - GENERAL

               1.01 DESCRIPTION

                    A. Work Included:

                         The work covered under this Section includes, but is not
                         necessarily limited to:

                         I .  Installing sewer piping and manholes to the lines and
                              grades as shown on the contract drawings.

                         2.   Interconnection with existing sanitary sewer system.

                         3.   Providing test reports and certificates of compliance.

                         4.   Performing leakage tests.

                    B .  Related Work Described Elsewhere:

                         1 .  Earthwork                           Section 02200

                         2.   Bituminous Paving and Patching       Section 02500

               PART 2.00 - MATERIALS

               2. 01 PIPE

                    I .  Asbestos cement sewer pipe and pipe fittings shall meet the
                         requirements of ASTM Designation: C428, as needed to date
                         Class 3300, Type II; size 1011 shall meet the requirements of
                         ASTM Designation; C644 as amented to date, Class 2400,
                         Type II.

                    2.   Physical and Chemical Properties:

                         The pipe shall be sulphate resisting and shall contain no
                         more than 1 percent uncombined calcium hydroxide (free
                         lime) when tested in accordance with the uncombined cal-
                         cium hydroxide test as described in AWWA C-400 or ASTM
                         C-500.

                    3.   Marking:

                         Pipe shall be marked along the outside of the barrel in bold
                         style type and shall indicate the manufacturer's name, pipe
                         size, class and date of shipment. Each coupling shall be
                         clearly marked with the trade name, size and class of the
                         pipe with which it is designed to be used.

                                             02722-1
<pb n="26" />

              PART 3.00 - EXECUTION

               3 01 PIPE

                         All pipe and accessories shall be of new and unused mate-
                         rial and shall be laid true to the lines and grades indicated
                         on the drawings. The pipe shall not be laid in water or
                         when trench or weather conditions are unsuitable for the
                         work, except by permission of the Owner. Water shall be
                         kept out of the trench until joints have been completed and
                         the trench backfilled and tamped to at least twelve (12)
                         inches above the top of the pipe. When work is not in
                         progress, the open ends of the pipe shall be closed, in
                         such a manner as to prevent the entry of groundwater,
                         earth or foreign materials.

                    2.   The bottom of the trenches shall be accurately graded to
                         provide bedding which consists of a uniform bearing and
                         support for each section of the pipe on undisturbed soil at
                         every point along its entire length, except for the portion
                         of the pipe sections where it is necessary to excavate for
                         bell holes and for tye proper seating of pipe joints. See
                         typical pipe bedding detail on plans.       Collar holes and
                         depressions for joints shall be dug after the trench bottom
                         has been graded and, in order that the pipe rests on the
                         prepared bottom for as nearly its full length as practicable,
                         bell holes and depressions shall be only of such length,
                         depth and width as required for properly making the parti-
                         cular type of joint. Except where rock is encountered,
                         care shall be taken not to excavate below the depths in-
                         dicated.

                                          END OF SECTION

                                             02722-2
<pb n="27" />

               SECTION 02819 - LOAMING AND GRASSING

               PART 1 - 00 - GENERAL

               1. 01 DESCRIPTION

                    A     Work Included:

                          Areas to be provided with loam and grass are indicated on
                          the Drawings and include, but are not necessarily limited
                          to:

                              Furnishing and placing 611 of loam.
                          2.  Liming and fertilizing.
                          3.  Seeding.

                    B .   Related Work Described 'Elsewhere:

                          1.  Earthwork                      Section 02200
                          2.  Stripping and Stockpiling      Section 02113

               PART 2.00 - MATERIALS

               2. 01 LOAM

                    A .   All loam necessary to complete the work shall be provided
                          by the Contractor from on-site stockpiles and, for such
                          additional quantities as may be required, from an approved
                          source off the site. The loam shall be natural, friable and
                          possessing characteristics of the soils of the vicinity which
                          produce a heavy growth of crops, grass or other vegetation
                          and shall be light to dark brown in color. The loam shall
                          be reasonably free from subsoil, clay., lumps, stones,
                          stumps, roots and similar objects, any of which are larger
                          than one inch in diameter, brush, objectionable weeds or
                          other litter, excess acid or alkali or any other material or
                          substance which may be harmful to plant growth or a hind-
                          rance to grading and maintenance operations.

               2.02 SEED MIX

                    The seed mix for those areas designated to be seeded shall be
                    composed of the following seeds mixed in the proportions by
                    weight and testing the minimum percentages of purity and germ-
                    ination as follows:

                                         Proportion
                                         by Weight            Percent              Percent
               Type of Seed               Percent            of Purity            Germination

               Penn Lawn Chewing              40                  95                   88
                 Fescue
               Kentuckey Bluegrass            25                  95                   90
               Merion Bluegrass               25                  95                   90
               Domestic Rygrass               10                  98                   90

                                              02819-1
<pb n="28" />

               PART 3.00 - EXECUTION

               3.01 PREPARATION OF SUBGRADE

                    A.   Clearing: Areas upon which loam is to be placed shall be
                         cleared of all vegetation, stones, and roots larger than one
                         inch in diameter, brush, debris and any other material
                         which might interfere with or be harmful to plant growth.

                    B.   Grading: The subgrade of all areas on which loam is to be
                         placed shall be brought to an elevation 611 below the pro-
                         posed finished grade of all seeded areas. All filling, ex-
                         cavating and grading shall be done to produce a subgrade
                         at the proper elevation free of depressions and irregulari-
                         ties.

                    C.   Discing: After subgrades of the areas to be loamed have
                         been satisfactorily brought to the proper condition, ele-
                         vations and contours, and immediately prior to placing, and
                         spreading the loam, the subgrade shall be loosened by
                         discing, scarifying, or other approved method.

                                             02819-2
<pb n="29" />

            SECTION 02850 - RAILROAD WORK

            PART 1.00 - GENERAL

            1.01 DESCRIPTION

                 A.  Work Included:

                     The railroad trackage and installations are indicated on the
                     Contract Drawings and include, but are not necessarily
                     limited to:

                     1.   The laying and ballasting of the tracks shown

                     2.   Switches and control mechanisms

                 B . Related work described elsewhere:

                     1.   Earthwork

                     2.   Storm Drainage

            2.00 - MATERIALS

            2. 01 GENERAL

                 All materials shall conform to applicable specifications of
                 A. R. E. A. Manual, latest edition.

            2.02 WOODEN CROSS TIES

                 Cross ties shall be creosote treated 10 lb. to the cubic foot oak
                 or pine; minimum dimensions 9 inches wide by 7 inches thick by
                 8 feet 6 inches long.

            2.03 STEEL RAILS

                 Rails shall be new or relay rail having a minimum of 100 lbs. per
                 yard nominal weight, included shall be all splice bars, bolts,
                 nuts, washers as required.

            2.04 SWITCHES

                 All switches, switch stands, frogs, guard rails, etc. shall be of
                 new manufacture.

            PART 3.00 - EXECUTION

            3.01 PLACING TIES

                 Ties shall be spaced at 2011± center to center. Ties shall be laid
                 with the wider face down and normal to the center line of the
                 track. Space shall be equidistant from rail joints and support
                 rails at end of splice bars. One end of the ties shall be align-
                 ed. Ties shall be moved only with tongs.

                                          02850-1
<pb n="30" />

               3.02 TRACK LAYING

                    Rail shall be laid with staggered joints; i.e. the joints on rail
                    shall be located as nearly as possible opposite the middle of the
                    other rafl. Temporary shims shall be used to secure proper
                    spacing between ends of rail, and the rail temperature at the
                    time of laying shall determine the number and thickness of the
                    shims required.

                                         END OF SECTION

                                             02850-2
<pb n="31" />

               SECTION 02881 - DREDGING

               PART 1 - 00 - GENERAL

               1.01 DESCRIPTION

                     The dredging work to be performed under this Contract consists
                     of all operations required for satisfactory removal and disposal of
                     all materials encountered within the lines and to the grades as
                     shown on the Contract Drawings for dredging. Dredging and
                     disposal of dredged material shall be in strict compliance with all
                     local, state and federal regulatory agencies.

               PART 2.00 - EXECUTION

               2. 01 GENERAL

                     A .  The Contractor shall obtain and assemble the necessary
                          equipment, plant and material required for accomplishment
                          of the work under this section of the Contract.

                     B .  The Contractor shall use reasonable and proper care in the
                          prosecution of his work to assure the stability of the exist-
                          ing wall and new structures adjacent to the site of the
                          work, insofar as they may be jeopardized by the operation
                          of dredging and by the moving of equipment.

                     C.   The Contractor shall conduct his operations in strict com-
                          pliance with all local, State, and Federal regulatory agen-
                          cies.

                                           END OF SECTION

                                              02881-1
<pb n="32" />

                SECTION 02882 - FENDERS, BOLLARDS AND CLEATS

                PART 1.00 - GENERAL

                1.01 DESCRIPTION

                     A.   Work Included:

                          The work under this section includes the furnishing of all
                          labor, equipment and materials, and performing all ope-
                          rations in connection with the installation of fenders, bol-
                          lards and cleats.

                     B .  Related Work Specified Elsewhere:

                          1.    Cast-in-Place Concrete:                   Section 03300

                PART 2.00 - MATERIALS

                2.01 FENDERS

                     The Fender Systems shall consist of all rubber fender units and
                     all accessories and hardware for mounting of the units as shown
                     on the contract documents. Shop drawings and certificates of
                     compliance shall be submitted by the Contractor and approved by
                     the Engineer prior to installation.

                2.02 BOLLARDS

                     Bollards shall be cast steel, Navy standard type. They shall be
                     capable of resisting an allowable fitting load of 200 kips at 301
                     with the horizontal.     Shop drawings and certificates of com-
                     pliance shall be submitted by the Contractor and approved by
                     the Engineer prior to installation.

                2.03 CLEATS

                     Cleats shall be 42-inch, cast steel, Navy standard type. They
                     shall be capable of resisting an allowable fitting load of 50 kips
                     at 300 with the horizontal. Shop drawings and certificates of
                     compliance shall be submitted by the Contractor and approved by
                     the Engineer prior to installation.

                PART 3.00 - EXECUTION

                3.01 FENDER UNITS

                     Fender units shall be installed directly to embedded inserts.
                     Inserts shall be embedded during the placing of concrete. No
                     @ield drilling of holes will be allowed prior to installation of
                     insects. All dimensions shall be checked with the manufacturer's
                     shop drawings by the Contractor.

                                               02882-1
<pb n="33" />

               3.02 BOLLARDS AND CLEATS

                    Bollards and cleats shall be installed and shall be leveled and
                    properly anchored with nuts drawn tight and threads upset.
                    After all bolted connections are made, the recessed bolt holes
                    shall be filled with lead. All bollards shall be filled with con-
                    crete. Dimensions shall be checked with the manufacturer's shop
                    drawings prior to embedment of hardware in the concrete.

                                         END OF SECTION

                                             02882-2
<pb n="34" />

               SECTION 03300 - CAST-IN-PLACE CONCRETE

               PART 1.00 - GENERAL

               1. 01 DESCRIPTION

                    A .  Work Included:

                         Cast-in-place concrete required for this work is indicated
                         on the Drawings and includes, but is not necessarily limited
                         to:

                         1.    Pile cap
                         2.    Headwalls

                    B .  Related Work Described Elsewhere:

                         1.    Steel Sheetpiling:                 Section 02369
                         2.    Storm Drainage:                    Section 02721

               PART 2.00 - PRODUCTS

               2. 01 CONCRETE

                    A .  Cement:

                         1 .   All cement shall be Portland Cement conforming to
                               ASTM C-150, Type I or II, and shall be the product
                               of one manufacturer.

                    B.   Aggregates:

                         1.    All aggregates shall conform to ASTM C-33-71, "Spe-
                               cifications for Concrete Aggregates".

                         2.    Fine and coarse aggregates shall be regarded as sepa-
                               rate ingredients.  Each size of coarse aggregate, as
                               well as the combination of sizes when two or more are
                               used, shall conform to the appropriate grading re-
                               quirements of ASTM C-33.

                    C.   Water:

                         All water shall be clean and    free from deleterious matter.
                         Where possible, water shall be from the municipal supply.

                    D.   Admixtures:

                         1.    All concrete shall contain entrained air. Air-entrain-
                               ing admixtures shall be I'MB-AE 10" as manufactured
                               by Master Builders, "Sika AER" as manufactured cy
                               Sika Chemical Corp., or an approved equal and shall
                               conform to ASTM C-260-73.

                                             03300-1
<pb n="35" />

                  2.02 CONCRETE REINFORCEMENT:

                        All concrete reinforcement materials shall be new, free from
                        rust, and shall comply with the following reference standards:

                        A.    Bars for reinforcement:                         "Specifications     for
                                                                              Deformed         Billet-
                                                                              Steel     Bars      for
                                                                              Concrete Reinforce-
                                                                              ment", ASTM A-
                                                                              615-Grade 60.

                        B.    Wire fabric:                                    "Specifications     for
                                                                              Wire     Fabric     for
                                                                              Concrete          Rein-
                                                                              forcement",       ASTM
                                                                              A-185.

                  2.03 METAL ACCESSORIES:

                        A.    Metal Accessories      including spacers, chairs, ties      and other
                              devices necessary for proper assembling, placing, spacing
                              and supporting all reinforcement in place shall be provided.
                              Specifications for these products shall be in conformance
                              with PS7-66 of the National Bureau of Standards, Depart-
                              ment of Commerce, "Wire Bar Supports for Reinforced
                              Concrete Construction".         These standards are also con-
                              tained in the Concrete Reinforcing Steel Institute "Manual of
                              Standard Practicelf.

                        B .   Bar supports for interior concrete reinforcing shall be
                              Class A - bright basic bar supports; bar supports for
                              exterior and exposed to view concrete reinforcing shall be
                              Class C - plastic protected bar supports.

                  2.04 OTHER MATERIALS:

                        All other materials, not specifically described but required for a
                        complete and proper installation of concrete reinforcement, shall
                        be as selected by the Contractor subject to the approval of the
                        Owner's Representative.

                  PART 3.00 - EXECUTION

                        Cast-in-place concrete shall be placed to the lines and grades as
                        shown on the Drawings and as specified herein.

                                                  END OF SECTION

                                                      03300-2
<pb n="36" />

                SECTION 16400     ELECTRICAL SERVICE

                PART 1. 00 - GENERAL

                1.01 DESCRIPTION

                      A. Work included:

                           The electrical work includes the following:

                           1.   Complete primary distribution system

                           2.   Complete grounding system

                           3.   Fire alarm system

                           4.   Street lighting

                B. Work Specified Elsewhere

                      1.   The responsibility for electrical work and items in connec-
                           tion with electrically operated equipment furnished by
                           others or under other Sections of these Specifications is as
                           follows:

                      2.   Connections to telephone equipment and telephone wiring
                           will be installed by the Telephone and Telegraph Company,
                           but the work under this section shall include the installa-
                           tion of all necessary poles and raceways for telephone
                           cables.

                      3.   Excavating, backfilling, concrete work, grading, and
                           paving shall be performed under other Sections of the
                           Specifications. Backfilling shall be done in a careful man-
                           ner, using the same earth carefully tamped in not over one
                           foot layers with all rocks, rubbis, and frozen earth re-
                           moved. The provisions of the applicable sections of the
                           Specifications shall apply to all excavating and backfilling to
                           be done under this Section.

                      4.   Concrete work shall be performed under applicable Sections
                           of the Specifications.

                PART 2.00 - EXECUTION

                2.01 MATERIALS AND WORKMANSHIP

                      A.   All materials shall be new and shall conform with the stan-
                           dards of the Underwriters' Laboratories, Inc. in every case
                           where such a standard, listing, or label has been estab-
                           lished for the particular type of material in question.

                      B .  Laws and Regulations: The installation, including tempo-
                           rary service for construction, shall comply with all state

                                                16400-1
<pb n="37" />

                          and local laws and regulations applying to electrical instal-
                          lations in Hawaii, with all applicable requirements of the
                          National Electrical Code and its latest revisions (1980) and
                          with the requirements of the Telephone and Telegraph
                          Company and the Light &amp; Power Company where such re-
                          quirements do not conflict with the laws and regulations in
                          effect.

                     C.   The Contractor shall obtain all necessary permits.

               2.02 DRAWINGS

                     A.   The drawings show the layout of the electrical system and
                          indicate the approximate location of outlets, apparatus, and
                          equipment. The exact routing of conduit runs shall be de-
                          termined by structural conditions.

                     B.   Manufacturer's shop drawings and catalog cuts shall be
                          provided for all necessary equipment.

               2.03  GUARANTEE

                     A.   This Contractor shall guarantee all systems, including
                          fixtures, as to be free from short circuits, open circuits,
                          loose connections, overheating, and such'other defects.

               2.04 TEMPORARY LIGHT AND POWER

                     A.   Provide all necessary light and power necessary for con-
                          struction.

               2.05 TYPES OF SERVICES

                     A.   Power from the existing substation will be 33,000 volts, 3
                          phase, 3 wire, 60 hertz -

                     B.   Power for street lighting will be 120/240 volts, single
                          phase, 3 wire, 60 hertz from distribution. transformers.

                     C.   Secondary racks shall be 3 of 4-spool, as indicated and
                          shall be complete with high glaze, spool type, porcelain
                          insulators. Racks and insulator points shall be made of
                          steel, not lighter than 9-gauge, shaped to prevent twisting
                          and bending.

                     D.   Anchor rods shall be double galvanized steel conforming to
                          ASTM Designation: A 107-46 and A 158-42T.

                     E.   Guys shall be provided for end poles as indicated and
                          specified herein. Guys shall be 7-wire strand, 7/16 inch
                          nominal diameter, extra high strength grade with a break-
                          ing strength of not less than 20,000 pounds.

                                              16400-2
<pb n="38" />

                   F.   Guy anchors shall be of the expanding (long type) in solid
                        ground, swamp type in soft, marshy or muddy soil, and
                        rock wedge (expanding) in ledge, designed to distribute
                        the holding power of the anchors over a wide area and
                        suitable for use in the type of soil encountered at the
                        anchor.

                   G.   Lightning arrestors shall conform to the ' applicable recom-
                        mendations and requirements of the National Manufacturers
                        Association Standard.

                   H.   Primary fuse cutouts shall be the indicating non-dropout,
                        extra heavy duty type. Open-link rural type cutouts will
                        not be permitted.

              2.06 DISTRUBITION TRANSFORMERS

                   A.   Distribution transformers shall be single phase, oil filled
                        with two 2-1/2 percent full capacity tape above and below
                        normal and shall be arranged for pole mounting.

                   B .  Transformers shall be rated 33KV/13.8KV, 3 phase, 3 wire,
                        60 hertz and 13.8 KV/120-240 volts, signle phase 3 wire, 60
                        hertz.

              2.07 COORDINATION

                   A.   The Contractor shall be responsible for fully coordinating
                        all of the various parts of the work included under this
                        section, and such other work of this contract as it may
                        affect the work of this section, throughout the various
                        phases of construction and before the ordering of fabrica-
                        tion of the various parts of the work, so as to insure
                        compliance with the drawings and specifications, and as
                        necessary to provide the installation complete and in satis-
                        factory operating conditions.

              2.08 FIRE ALARM SYSTEM

                   A.   All equipment shall be listed by the Underwriters' Labora-
                        tories, Inc., and the complete installation shall be made in
                        accordance with the applicable requirements of the latest
                        edition of NFPA Pamphlet No. 72B for auxiliary systems.
                        Provide street boxes with codes compatible with the base
                        system.

                   B.   Fire alarm cable will conform to IMSA Specifications and be
                        messenger supported.

              2.09 OVERHEAD CONSTRUCTION

                   A.   Poles for the overhead distribution shall be wood and meet
                        the National Electrical Safety Code for wind loading in the
                        area.

                                            16400-3
<pb n="39" />

                     B    Crossarms shall be wood with steel pins.

                     C.   Insulators shall meet NEMA standards for the voltage ap-
                          plied to the system.

                     D.   New construction shall conform as to strength, clearance,
                          loading, and workmanship to the best commercial practice
                          and to all standards and requirements of the National Elec-
                          trical Safety Guide for Class B construction. These shall.
                          be minimum requirements. Proper clearances shall be made
                          on the poles and/or structures for secondary and primary
                          circuits.

                     E.   All materials used shall meet the. applicable requirements of
                          standard ASTM, ASA, NEMA, AIEE, and EEL

                     F.   Unless otherwise indicated or specified herein, the overhead
                          primary installation shall conform with EEI and NEMA spe-
                          cifications. Standard mounting brackets suitable for cross-
                          arm mounting shall. be provided for the installation of the
                          lightning  arresters, disconnecting switches, and trans-
                          formers.

                     G.   Materials:

                          1.    Wire for aerial installation,   primary and.    secondary
                                shall be medium hard drawn copper,              neoprene,
                                weatherproof, and shall be in accordance with the
                                latest IPCEA specifications.

                          2.    Poles shall be full-treated Southern Pine reasonably
                                free of knots or knotholes, and straight- grained con-
                                forming to American Standard C 5-1.

                2.10 SUBSTATION CIRCUIT BREAKER

                     A.   Circuit breaker shall be vacuum, oil, or gas filled with
                          high voltage bushing on the top.          Units shall be free
                          standing with its own control cabinet.

                     B.   Breakers shall meet ANSI, NEMA, and IEC Standard.

                     C.   Breakers shall have the following ratings:

                          (1)   46KV
                          (2)   2,000 ampere continuous
                          (3)   1,500 MVA interrupting
                          (4)   Interrupting time 3 cycles
                          (5)   60 hertz
                          (6)   KV insulation level 105.

                     D.   Relays shall be provided as indicated. Where indicated,
                          breakers shall have synchronizing capabilities.

                                               16400-4
<pb n="40" />

              2. 11 MANHOLES

                    A.   Manholes shali be of precast or cast-in-place concrete type
                         with cable racks, ladders, pulling irons, and heavy duty
                         covers.

                    B.   Manholes shall be duplex construction, one for power and
                         one for telephone and fire alarm.

              2.12 CABLES

                    A.   Medium voltage cables shall be rated 35 KV, ungrounded
                         and 15 KV, ungrounded, 19 strand bare copper conductors,
                         strand shield, 220 mils, ethylenepropylene insulation, semi-
                         conducting tape, bare copper shield, and overall PVC
                         jacket.

                    B.   Stress cones shall be provided for all medium voltage
                         terminations.

                    C.   High voltage D.C. tests shall be provided after installation.

               2.13 DUCT

                    A.   Site raceway system will consist of concrete encased fiber
                         duct.

                                         END OF SECTION

                                             16400-5
<pb n="41" />

                                                                                                                           NOAA COASTAL SERVICES CTR LIBRARY

                                                                                                                            3 6668 14110533 0
</text>
</doc>
