[From the U.S. Government Printing Office, www.gpo.gov]
NORTH DULUTH AVENUE PUBLIC PROPERTY DEVELOPMENT FEASIBILITY STUDY STURGEON BAY, WISCONSIN 19 13 COASTAL ZOINE INFORMATION CENTER DONALD C. WIGGINS, P.E. TC 14 South Third Avenue 333 Sturgeon Bay,, Wisconsin .W53 1983 NORTH DULUTH AVENUE PUBLIC PROPERTY DEVELOPMENT FEASIBILITY STUDY STURGEON BAY, WISCONSIN .7 -:k bE NOAA COASTAL SERVICES C- ENTER 2234 SOUTH HOBSON AVENUE CH A.Rj. F @ TOP,' This study was financed by a grant from the Wisconsin Coastal Management Program, Wisconsin Dept. of Administration and the Coastal Zone Management Act of 1972, as amended, administered by the Office of Coastal Zone Management, National Oceanic and Atmospheric Administration. DONALD C. WIGGINS, P.E. 14 South Third Avenue Sturgeon Bay, Wisconsin NORTH DULUTH AVENUE PUBLIC PROPERTY DEVELOPMENT FEASIBILITY STUDY STURGEON BAY, WISCONSIN INTRODUCTION/BACKGROUND: The City of Sturgeon Bay owns an unimproved breakwater extending into the waters of Sturgeon Bay at the north terminus of Duluth Avenue. It is knownas "Bullhead Point". The breakwater extends 350 ft. into the Bay. At about 120 ft. off'shore -the breakwater widens from a width of 50 ft. to over 175 ft., creating a small protected harbor to the south- west of the breakwater. The original breakwater structure was constructed in the early 1900's to facilitate the shipping of rock from the quarry immediately west of the property. In accordance with records of historical publications, in the early 1900's, three steel barges were floated into place and sunk off the end of the south side projection. The barges were used as platforms; docks were built over the top, and the sunken barges were used to secure large (long) boats at the end of the land project- ion. The barges can be seen in the water and show on aerial photographs; the barges are a hazard to boating as parts extend just below water surface (in low water times these parts are exposed). A new Owner, in the early 1940's, expanded the breakwater structure to receive ship loads of sand to be used in a concrete manufacturing plant located at the old quarry site. In the late 1940's, the property was deeded over to the City. The ownership as part of a lake bed grant, defines or describes the property as 220 ft. of original shore line, and perpendicular to that line a north and south property line extend- ing 500 ft. into the lake. At the northwest, interior corner of the property is a 22 ft. wide neck (strip) of land extending from the pro- perty to the center of Duluth Avenue (an access way). In 1973, the City granted a local sailing group (a club) permission to utilize the property as a harbor for boat launching and storage. A Lease Agreement was drawn up but apparently never executed. The City and the sailing group, cooperating to improve the property, filled and leveled the surface and installed simple launching facilities. The property, being located in the outer bay, is well suited for launching small boats and especially sail boats, due to the direct access to the outer bay and Green Bay. Most other harbors and launching facilities are located in the inner bay, which is limited in size, has restricted @ccess to Green Bay because of the downtown highway bridge and is becom- ing increasingly congested. The sailing group's activity at the City property, for lack of numbers and help and organization, only lasted a few years; the club is not active at the present time. The property has several constraints which presently limit the use and capacity of the property to serve the public. The constraints include: the limited area of the property; depth of water in the harbor; hazard 2. of the sunken barges; steep and narrow access road, and traffic hazard along the public road; aquatic growth in harbor; unstable fill; inade- quate parking, ramp, storage; no public utilities or facilities; no maintenance, management, supervision program. For the last few years, the property-has been used by the public as a small boat launching facility and for shore line fishing. Thus use has been quite limited due to the property's unimproved nature and lack of facilities. It is recognized by -the local citizens as one of the best shore fishing sites of the Sturgeon Bay area. The neighboring property owners are frequently bothered with late hour parties, noise, leaving of rubbish, and, in general, poor maintenance and appearance. OBJECTIVES: This study will assess the feasibility of developing the Bullhead Point property for better public use as waterfront access, as a waterfront facility, and for related.public use. The st *udy will suggest specific site-development plans to guide future City action for improvem .ent'and use of this unique coastal resource. The study will conduct an environ- mental analysis and suggest an implementation and management strategy. The report will aid the City in securing financial assistance to imple- ment a development plan. The study will probably lead to future con- struction of improvements that will improve the aesthetics and utility of this coastal property. PROCEDURE: A Professional Consultant, Donald C. Wiggins of Sturgeon Bay, has been hired as an expert in land use, land development, engineering, plans, construction, costs, so as to develop and put together in report form, a study (an answer) for the objectives described above. The Consultant proceeded as follows: 1. Performed a boundry and topographic survey for the property - for the land and for the adjacent water area. An existing site plan (the survey) is attached to the report (Plan No.1 ). The survey was performed by Brey-Stuewe & Braun Survey, Ltd., Sturgeon Bay. 2. Performed an underground, soil, test-boring for the expansion and development area of the property. What is the underground material for excavation, piling, foundations? The answers are given in the att ached report, Item H, pages 1 to 12, as performed by STS Consul- tants, Ltd., of Green,Bay. 3. Walked the property and adjacent properties a number of times and examined its topography, features, conditions, materials, use, etc., all as required for evaluation of existing property, and recommenda- tions for development and use in the future. 4. Gathered information, maps, such as attached: a. City map showing location of North Duluth Avenue waterfront pro- perty. See Item "A". 3. b. Sturgeon Bay and Canal Chart #14919, dated 7/21/79. See Item "B". c. The Library Book, "Hollow Pits Sunken Ships", The Story of Wisconsin's Forgotten Stone Fleet by Alan R. Rowe. See Item "D-1 & D-2".. 5. Called on and talked to Most of the neighboring property owners; wrote to each (see attached Item "F") and announced that the study was in progress; invited each to come for a visit, to look at pre- liminary plans, and to give their ideas (suggestions or objections). The location and names of the adjacent properties is attached. See Item "C". 6. Called on and talked to the approval agencies who will be involved with approval of plans and installations at the Bullhead Point City property. These agencies are: Corps of Engineers - District Office, Kewaunee Mr. Donald Olson, Engineer in charge DNR - Ms Jean Binsfeld, Water Management Specialist, DNR, Green Bay DNR - Mr. Terry Lychwick, Fishery Biologist, Fish Management Office, for Door & Kewaunee County, Sturgeon Bay Harbor Commission, City of Sturgeon Bay - John Tenell, Chairman Urban Planner, Mr. William Chaudoir - Door County, Wisconsin Plan Commission, City of 'Sturgeon Bay'. John Taube, Secretary, Ed Allingham, City Administrator. 7. Called on, met with, and received information from two young men who had been a part of the sailing group (club) who, in 1973, attempted to improve and use the property for their club's sail boat use and training. The men were Eric 'Stearn and Scott Derenne. Their exper- ience with use of the propert '-Y was valuable. Their suggestions for development were vavuable - each is an expert sail boat operator. Eric is the son of Sue Stearn who owns the property between the City property and Duluth Avenue. As a practising attorney, he is the counsel to his mother for future use and development of her property. The water depths in the harbor were received from their records. They had made soundings in the win-ter (on the ice). This was information which the Consultant was not able to obtain and which he had stated in his Contract Agreement would not be included. The soundings are on the plans. A letter is attached from Eric Stearn, Item "G-1 & 2". Samples of leases used in communities for use of public property for @oat facilities, were received from the sail group - see Item "1-1-3" in this report. CONSIDERATIONS: What are the existing conditions and problems to be considered and solved? What is the best use for the property? The considerations are herewith stated and discussed. The development plan should be a plan and program compatable with the neighborhood'and agreeable to the majority of the property owners of the 4. neighborhood. It is a development in the front yard of a number of fine lakeshore homes. They should be given cons ideration. The exist- ing unimproved property, and unmanaged use, is not favorable to the neighborhood; but will a new development be better, bring more people, create more traffic problems? All neighbors favor improvement; being attractive, well managed; and having no structures,on the point to obstruct clear vision from the shore. All favor tubes thru the neck of the property so as to clear the aquatic growth that develops each summer in the harbor (water flow is needed). All agree: that a launch ramp for small boats is the proper use; there should not be permanent births, slips; facilities and space should be provided for shore fisher- men and,people to sit and watch; the City should maintain the property; control use; have hours for use. If the property is developed in this vein, the neighborhood would accept it - if not, they will fight it and that can impede development progress and improvement for everyone's benefit. Traffic and traffic problems is a concern to everyone. The entrance road grade and width must be improved. Improved vision and traffic slow- down must be accomplished on Duluth Avenue. The sunken barges are a serious problem (a hazard) for all boaters. Theyareon charts but this is not enough. They can bemarked (area restricted) or covered. There are legal problems. The existing road is on the Stearn property, not in the 22 ft. access corridor. The road has always been there - by "Adverse Possession" the City could claim the right to leave it in the present location. If it is placed in the access corridor, a retain- ing wall will be required. The Stearn property is land locked - do they know this - do they have waterfront rights? The first two.property owners of the south of the property (Hickey & Leiberg) have Riparian Rights - will they give up these waterfront rights if the south side of the point is extented? The indication is they would accept some extension for harbor improvement; if the harbor was cleared by installation of tubes thru the neck of the property, this would be an acceptable trade-off. It is reported by neighboring property owners that there are rock out- croppings, in the south harbor area. The soundings do' not show same. Underwater investigation would have to be done so as to locate and remove the outcroppings. More than ever, it confirms that the use of this water- front property must be for small boats. The neighbor to the north created his own barrier and private small harbor - this will not interfere with use of the public south harbor. The Corps of Engineers and DNR give verbal approval fordevelopment of the property. The preliminary plains were shown and described. Formal approval by these agencies only comes with submittal of a final plan. The Fish Management office of the DNR is the key (control) agency. They will go along with some land fill (south side extension) and want the same type of rubble stone banks as now exist (good for small fish), and will probably want part of the sunken barges left for fish habitat, even though they know the barges are a boating hazard. An ultimate, ideal plan would be to cover the sunken barges - this approval may never be achieved. It will have to be a future consideration. 5. What'are the conditions which control use of the property. The primary wind and wave action is down the channel from the northeast. The shape of the property and the extension to the south gives good protection to the harbor. Wind and wave action from the southeast will not reach the harbor area. The location and shape is excellent for protection of small boats. The only deep water is directly off the end of the point, where large freighters (carriers) used to tie up. The depth of the water in the harbor (1983) varied from What is feasible what is reasonable to develop on the property. Parking space is needed, improved entrance road, a concrete launch ramp, a dock, tubes thru the neck of land for water movement, toilet facilities, secur- ity lighting, landscaping, and a program of controlled use and maintenance. RECOMMENDATIONS: There is a great demand for a protected small boat launching facility in the less congested outer Sturgeon Bay area and on the west and north side of the City. This is especially true for sailboats which are hampered by the downtown highway bridge in the inner bay. Development and improvement of the property for a small boat launching facility, maintaining use and availability'df'the property'fof-'shoi-O'' fishing, make the property attractive, maintaining and managing the use of the property, providing facilities, is the only logical and good and practical use of this City property. The roads and access, residential type area, water depth around the point; limited space now and.in for- seeable future, and maintenance of a good fishing habitat, limits the use to small boats and to controlled and managed use. The only hazards for small boats are the sunken barges and reported rock projections in the harbor - the barges to be covered or marked and rock projections to be removed. This is not a parcel of property, a waterfront area, for a marina, a birthing, a commercial facility. This proposed development should improve recreation facilities in the area and increase small boat use and safety in the area. As a start, and until previously described legal problems are @olved, and/or the Stearn property is acquired, or is available for use, the shore area will be limited. Use of the access corridor (City property) will require road relocation and building of a retaining wall to protect adjacent property (no problem). 'The south end of the projection can be slightly extended, squared up, improved so as to enlarge space for turn around, parking, landscaping and still not create a major conflict of Riparian Right lines with the neighboring properties, or a major conflict with the DNR due to creating bad conditions and losin g the good fish habitat. The recommended installations are hereby listed, regardless of final size and shape of shore area and projecting area: -Clear Duluth Avenue road side for vision, and provide signs on each side of the.entra,nce. -New, regraded, widened, entrance road. Two, 48" culverts thr'U the center of the neck of land, with tops at present water line. 6. Rebuilt, widened road onto the property and a turn around and parking -area at the outer end. Square up and extend the south end of outer area, with matching, rubble rock embankments. -Concrete launching ramp and finger dock for launching, and tie up dock for loading and unloading boats. An electric hoist is recommended, as not all small boats can use a ramp. Sheet piling is to be used at ramp and docks. Underground conditions are good for use of sheet piling. -Landscaping of all areas. Green areas are to be provided at the outer end for fishermen and with benches, picnic tables, trash containers. -A Rest Room facility at the shore. It will have to be self contained, with holding tank and a well. -Security, safety, low intensity lighting. Neat signs - instructions and information signs. It is recommended that the development and improvement program proceed in stages. Plans A, B, C have been prepared and are a part of this report. Staged construction is an aid to stage financing and it is an aid to determining what installations are best for the operation so i-mprovements can be made for next stage. And,time is an aid to straightening out legal entanglements (disputes), acquiring adjacent property, and developing leases and/or other means of management, operation, financing. The ideal, ultimate plan for maximum use and elimination of all hazards is obviously Plan C. At present this plan will-have much opposition from neighbors and DNR. Time may bring this plan about. If funds are avail- able, the good alternative is Plan B. Plan A is obviously minimum plan, minimum cost and a plan which could proceed with easy approval (no opposi- tion). City certainly has the right to bring about such improvements. FUNDING & OPERATION: Development of Bullhead Point for a City Park with a small boat launching facility and for public waterfront use for resting, observing, fishing is a development and improvement program to be programmed, budgeted, imp- lemented. The City will probably seek financial assistance from Federal and State sources. Assistance will be helpful (but is limited) from volunteer groups, clubs, organizations. A park for daily, public recrea- tion use is not a commercial establishment for business and income (either to do the improvements or to pay for maintenance). The Yacht Club might be interested in storing a few boats on the Stearn property and thus be able to use the upper (outer) harbor for their Sail Training program. They would pay a yearly rental (use) fee. If the property is improved (developed), the Sailing Club might make a comeback (organize) for renting and operating the installation. The only source .of income would be the launch ramp (or hoist) and thatmeans having a City employee at the ramp and having hours for use. The employee would also supervise use of the park and keep it maintained landscaping, clean up, utilities. I recommend improvement of Bullhead Point for the public as a waterfront facility for small boat use and picnics, fishing, enjoyment. Keep it a simple, attractive, well maintained public property. The location, access the space., and the neighborhood (adjoining use):is hot the r.ight place for a commercial development. Such a purpose,.a.use, will require..special., 7. public funds (when available), setting aside'@unds*for this purpose for a few years, and doing the improvements in stages (over a period of time). An attractive master plan, a presentation and promotion plan would be a good tool for donations from fishing, waterfowl, boating enthusiasts and clubs. It is a fringe or neighborhood type public park, not in the cen- tral area where all people would support a general assessment. It is an unusual, valuable City property available and well suited for waterfront recreation use. COST ESTIMATES: I started with the intent of producing a normal planning, feasibility study with one ideal, master plain. I became enthusiastic, involved, and have so'ught out and tried to solve all of the problems related to use of the property. Staged development is a means of problem solving and this requires several plans - programed development plans.. Attached to this report are three plans, three cost estimates. All plans require the basics of an entrance, good roadway, water flow tubes, turn around and parking, a concrete lauch ramp and pier, landscaping, toilet facilities. The variables and items that can be developed or added in stages are land area, additional property (such as Stearn property), amount of parking, size of dock, addition of a hoist, additional facili- ties and landscaping. The estimates are at the end of this report; the plans are attached and are Nos. I (Existing); A (Stage 1); B (Stage 2); C (Stage 3). SUMMARY: The recommendation for this report is to develop the North Duluth Avenue Pulbic Property (Bullhead Point) for a Public Park, which will be used for launching and landing small boats, shore fishing, picnics, and public enjoyment. It is an unusual, valuable public property and one of the few remaining, shoreline access areas available to the public in this Sturgeon Bay area. It is not adapted to commercial, high traffic use. It is limited space which can be well used by the public as recommended. The site characteristics are well adapted to the recommended use. Present soils and shoreline are stable. Ground material and condition is good for driving sheet piling for ramp and docks (rock is more than 20 ft. below water surface); water depths for east and south sides (the navigable sides) is fine for small boats; the point and south projection protects the harbor from wave action; the addition of under water tubes through the neck of the point (the projection) will allow water circulation so as to keep the south harbor clear and clean. To the east of Bullhead Point, the water is deep and completely clear and navigable for all size boats to the Sturgeon Bay channel. Envirionmental Impact (effect), as typical, is least with Stage 1 and progresses upward with Stages 2 8A 3 since more change is made with each stage, relative to effect on neighbors and neighborhood; fish and water- fowl; potential for numbers of people and traffic and safety and clean- liness. However, property, and particularly public property must serve as many people and interests as possible. Stage B, again, is the best 8. overall, ultimate plan for removal of hazards but it meets with most opposition at the present time for its effect on fish habitat and infringement on neighbors and riparian rights. The hazard of rock out- croppings in the harbor can be removed. Investigation and location of any rocks and the limits and contours of the su nken ba'rges should be completed and recorded and is best done with underwater gear (equipment). This would be a good volunteer project of a sc'u*'b*a diving' clu"b. As far as economic feasibility, a public park with facilities and required maintenance and management and security does not have potential for income. A lease to a commercial waterfront business would be the best return but be the worst and an entirely different and restricted use. A sail boat club, the Yacht Club, would pay a minimal rental for boat storage (on the shore) and launching privileges. This is a year to year, unguaranteed income. This rental would help pay for maintenance, not development cost. A launching fee can be charged to the public, and should be, but this requires personnel to manage and collect the fee - the fee would help pay for this personnel. There is a potential for some volunteer help and donations from interested individuals, from business and industry, and from service and recreation oriented clubs but no dollar amount can be assigned. This project will have to be a City budgeted, financed, special grant program. Cost estimates are presented in this report and will be useful for fin- ancial programming. A presentation and promotion strategy and plan should be developed. As the waterfront parks and properties become more and more used, crowded, limited, the public will support a budget, or match- ing funds if a State or Federal grant can be available and be obtained. The report has described a small boat hoist as a part of the boat launch and recovery installations for Plans B and C. This was suggested by many people. This is obviously an optional installation. It has many hazards, insurance would be required and costly, and an experienced operator should be provided( 'another cost). This installation is questionable. The recommendations for North Duluth Avenue Public Property Development, is to start by improving and maintaining the roadway; to clean up the property and keep it clean (few rubbish containers); to put up neat signs as to use and hours; to supervise the use; and have it as a part of re- gular police patrol. The Stearn property should be acquired, whether by purchase or donation, and the legality of leaving the entrance"road where it is (now on the Stearn property) should be cleared. Another installa- tion that is important to do, for improvement of the property, and present use, is to install the two culverts through the neck of the property. This will improve water condition and be in great favor with the neighbor- ing property owners and people who presently use the property. I state again, this is an unusual, valuable public property and an asset to the City of Sturgeon Bay for public use. It should be improved, care- fully developed, and treated as a valuable part of the Sturgeon Bay public property. 9. NORTH DULUTH AVENUE PUBLIC PROPERTY DEVELOPMENT FEASIBILITY.STUDY COST:ESTIMATE PLAN A Stage I -Road Fill, Grade, Gravel Surface $ 4,500 -Parking Area 4,800 -Landscaping 3,000 -Retaini.ng Wall (Alternate consideration is to purchase I Stearn property) 15,000 -Comfort Station Building, Holding Tank, Well 22,000 -Concrete Ramp 3,800 -Pier ... 2,0.00..... -Piling & Dock 30,000 -Electric Lights Lights (5), Pump, Building Service, Property-Service 4,000 -Markers (floats) for barge area 1,500 -Culverts (tubes) two, 4 ft. 7,500 TOTAL $ 98,100 +10% Contingency ..9,810 GRAND TOTAL $108,000 Note: No Equipment Tables, Benches Fireplaces Boat Hoist Dredging Optional Item of Hoist $7,500 10. NORTH DULUTH AVENUE PUBLIC PROPERTY DEVELOPMENT FEASIBILITY STUDY C-OSTESTIMATE PLAN B Stage 2 Items and cost of Stage 1 $108,000 Plus, Stage 2 Items: -Fill 40,000 -Additional Parking Area 3,500 -Additional Landscaping 2,000 -Additional Piling & Dock l') C_'0OO TOTAL $165,500 +10% Contingency 16,550 GRAND TOTAL $182,000 Note: No Equipment Tables Benches Fireplaces Boat Hoist Dredging Optional Item of Hoist + $7,500 NORTH DULUTH AVENUE PUBLIC PROPERTY DEVELOPMENT FEASIBILITY STUDY COST ESTIMATE Plan C - Stage 3 Items and Cost of Stage 1 $108,000 Items and Cost of Stage 2 74,000 Plus, Stage 3 Items: -Fill 46,000 -Additional Parking Area 4,000 -Additional Landscaping 2,500 -Additional Piling & Dock 18,000 TOTAL $252,500 -Omit Markings at Barges 2,500 Balance $250,000 + 10% Contingency .25,000 GRAND TOTAL $275,000 $275,000 Note: No Equipment Tables Benches Fireplaces Boat Hoist Dredging Optional Item of Hoist + $7,500 ITEM A PROJECT LOCATION H I J WAMAH A 14ORTH DULUTH A A MA X ALA WA AVENUE WATERFRONT PROPERTY @Ll BCLMkR COLORA)o !Dmm it's A oc AWAPC YMYTiz I ' DELA4, IA PC ST -oE Me ST FC L A A I I ORGIA JX ST. GEO GLA c- 1 rEE5 'i%... 10 A IINT if FER" A z T, ul 'w [Lid C ZIG A P4 -w HICKORY p NN rLVAN A IA OLIFA CY LAND ()Or I ;LAlqO 7. r ISLA K R SUP401tost uPERiOR C r. 0 W. LOC TV rw L E C. TCXAS XA.S PL. W., E. OAK fir UTAH LITAN Pike 3C.P.1 -ow per P,w 0*000 FIL. P R LAKC C. RhNONT Pt PRUC A: CA K4LL AD., SPR CAC oft E z A' PL. E. YEW TACO" 19 CACH 0 VICK P.- CITY MAP & STREET GUIDE 'STURGEON BAY, lH(LOK oil STRAW80WY LN. WISCONSIN @01 @1@ .6 L*W L* 0 ;c, 3 T T. cw" l;c,; -.0 .50to pl, - ' 1-//-7 Scal e: 3 1 =3000 3uurgeon Bay & Canal" Chaft--No. 14919 (Y) PLIIIIJ)-01.11 LICilIlIC, FE' E T 00 001000 2000 3000 1.000 6000 7000 8000 9000 10000 11000 1 Mo 13000 14000 15000 I - I. ____ - - _- - - - - - m E T 17, 11. S 1000 500 0 1000 2000 3000 4000 STATUTE fdll,E'S 0 2 ITEM "B" 19 5 67 Bradley Lake Z@ N '22 jE, 17 1") 0 \,J@ 18 0 7 ,\\ \\@7 03\\ 70 1,19 19 17 17 \\ \\ \J") SUNSET 16 17 14 C/ 13 76 1 PARK 0r 20) 16 17 5 2 4 6 16 10 159 5 ULLHEA\p PO\INT f5" 13 \- \ C,ibO to \ " \ 13 to St,6, C,,6@ 15 A 17V Georgia S, lto 16 .15 is 17 (3 1 3 It, \_91 Ory Dock 17 \17 B.Y 'Sh,pbuilclinq pcoLrp@ 2 18 \ \.\ 16 C I FIG4- P, 57 CY 13 18 16 184 1. \\ "-" , \\ 4- 16\ 16@ \ . 12 17 G 7 20 13177 r, to @a S1 15 113 \ I 14 B.Y @@ildinq Corp, 5 to 17 "/q., IZo 13 %7 .S,6rr, C,,6 M \\ 12 17 5 5 4 1 :15 42 vi Dij. ilup Ract- 114 16 18\ \1 4, , . 1 17 C/ 4 12 \\ @S@6- C,,617 15 5 11 ( SPIRE Gr"' 14 10 14\\ O.,,ry fill 4 10 11 Lawriegilco 17 3 S4, -5 12 16) 13 11 C7 Port Door Po III 10 \17 LZimperlyaras OffiCe 42 7Cl X 13 14 cm; vo, .'s.hen Crib 10 13 C 16 10 0" 14 St. 13 12. 12 12 W.. 3 P.1- c,, nson Inc., 7 _73--l 5 -_CIO 13 13 15-11 4 14 J! 0 14 4 I (r, 17F Cl,b'l5 q iersom Suildnts --k or Counly 2 4 /@@o 0,perali,e 1 2 k2 3 m 17 SPIRE 0 -W -M,.,tj V_j L St 4i 15 16 7 3 14 7 -E CHY e. 13 DICKENSON ITEM "C" CLIFF DWELLERS GLOWACKI STANGEL. tip'. 68 pA 60 C 4KC m CIHLAR HANSON -10 STEARN At4o 6 pi 14 69 HI CKEY KRAUSS QUARRY ORIGIIVA -.@HORE L IA'E 9- 4@ CONLON 4@ BRIDENHAGE,N WERKHEISER w (L oo D 0 C:l LYNCH < uj 4 N 3: (D w cr FRIEMAN w E Z KASTEN u- LL 0 0 KASTEN z 0 MEYER 0 100 200 300 400 500 FEET 11011JOUT 14's 4 li Pay ASUNKEA SHIPS THE STORY OF WISCONSIN'S FORGOTTEN STONE FLEET DOW by LJK" Alan R. Rowe (P lAvTfL '.V I, tiaLAAS ISBN 0-933832-00-1 j -JA LibraryofCongress CaWog Card No. 79-63344 IN @SyJKE- VkZ %m ROWE PUBLICATIONS! 7 brisk. A chilled steady wind from the west produced a barage of white caps. Entering the water was difficult. Rolling waves crashed over theembankment of the pier, forcing me to cling to,rocks for support. I fumbled around trying to get a foothold on the wet beach stones. My slippery rubber wet suit didn't help matters. I had good intentions of completing several dives at this site, but during my entry of the -surf, my one and only in- S TURG560 SM STOJIF CO- flated raft ripped open on a sharp outcrop. My first thought was to save the excavation tools while precious air screamed WEsT ,@kolka AAD IZARMWI-"' out of the puncture. One huge roller lashed in. and sent tools and marker bouys flying. To make things worse, another wave swept away one of my two flotation drums. By the time I thrashed my way after it, all I could see of it was a painted blur a mile down the shore. I was off to a good start! By now the winds had risen even higher. Three foot waves crashed over*the wharf, making standing upright impossible. ,Unable to keep any semblance oforder, I found a solution in adding twenty more pounds of lead weights to my belt. Reluctantly I crawled under the torrential surface. The real re@ struggle began while fighting the surge created by water rumbling against the rocks and returning to build up again. By hugging the wreckage and grappeling anything in sight, I OAV L IEA F managed to explore the hulls. The three wrecks in this cover were once consorts of the tugs, Irma "eeler and LN. Foster. They had traveled to the same ports as their sister ships, the Empire State, Ida Corning and the Oak Leaf. The trips they made however, were not as often. T"Meirnames didn't appear in the marine news columns IDR QWMO as frequently. The Andrew and Emerald were smaller and had a shallower draft than most of the other barges. 'Their lightness was needed at this point on the bay because othe depth here was no more than ten feet. From lack of machinery in the wrecks, I concluded that they had been either schooner type barges or scows. Two of them still contained loads of cut rock. The third member of this group was ripped apart and Aj partially covered with drifting sand. Of all the stone fleet that I had examined, this trio had received the most damage. Where fire had ravaged the 33 34 u-------------- J. MEN Fiq MULTI- :0 -@ - _--- PURPOSkt ponm - wom. HOLDING' -rANK bF-LOW rn FLOOR PLAN 5cALE: V- 0" E L E VA T ION ALL 0&5CUVZF- GLAZINC-i REST ROOM' FACILITIES @FOR BULLHEAD POINT. STURGEON B AY* ITEM "F" DONALD C. WIGGINS Proftssional Engineer 14 South 3rd Avenue Sturgeon Bay, Wisconsin 54235 Telephone 414/743-4422 July 21, 1983 TO: RE: - Property Owners Adjacent to Bullhead Point, City of Sturgeon Bay, Wisconsin I have been commissioned to do a land-use study for the,City of Sturgeon Bay for their property at the north end of Duluth Avenue :at the lake shore; the property is called "Bullhead Point". You live, or have a business, adjacent to this City property. A logical consideration for use of the property is for an improved small boat launch and docking facility - a day use facility. This is also one of the few public locations where people can fish from the bank (good fishing); this recreation feature should also be maintained. The good consideration is the proposed improvement of an unimproved piece of City property. This could become a City Park - patrolled and maintained. I invite you to stop at my office at 14 S. 3rd Avenue and inspect the preliminary plan work now in progress. Voice your opinions; be a part of the improvement and solution. If you think there are problems, bri.ng them up. If you have suggestions, tell us. We welcome your visit and appreciate your interest. Thank you for all considerations. Take a look and lend a hand. I hope to see your or hear from you. Sincerely yours, onald.C. Wiggins,- DCW:fg D ITEM 11G--111 STEARN & FITZGERALD ATTORNEYS AT LAW 253 NORTH FIRST AVENUE P.O. BOX 403 STURGEON BAY TELEPHONE ERIC A. STEARN STURGEON BAY, WISCONSIN 54235 (414) 743-8866 E. JIM FITZGERALD GREEN BAY PAUL L. JONJAK TELEPHONE OF COUNSEL (414) 432-9702 FISH CREEK J luly 26, 1983 TELEPHONE (414) 868-3256 TELEX: 910-270-1375 Mr. Don Wiggins Profession'al Engineer 14 South Third Avenue Sturgeon Bay, WI 54235 Dear Don: Thank you for your letter of July 22, 1983. First of all, I must inform you that my mother, Sue Stearn, is on vacation on a sailboat cruise until August 7, 1983 and won't.be able to respond to your inquiries until after that date. However, I can say, that in addition to her reason for purchasing the adjacent property for investment purposes, it was done with the major purpose of having that property used for part of a sailboat storage and landing facility. In any event, I certainly will see that she receives the letter as soon as she returns. I also have reviewed your plans, and also favor Plan A. Of course, I would like to see an amendment to this plan if the Joint property becomes available to the city for the yacht club use or the above described purpose.' I think a small facility would include rest rooms, bars, sail storage lockers, and a meeting room would be ideal placement on the Stearn property. In addition, I would recommend that either finger piers be constructed or a floating parallel dock be constructed along the Stearn property thorugh inner harbor., where feasible. This would allow more storage place for the boats and a potential keeping of some small keel boats in the water. Of course, this could be phased in at some later stage of development. Generally speaking, I like your plan arid'at very pleased to---- see the progress you have made., As soon as you have come up with some definitive plan, please let me' know. I think one of the key ingredients to this whole project is to show the city that not only does this make the harbor "look good" but that it will be providing a valuable community service. ITEM "'G'211. Mr. Don Wiggins July 26, 1983 Page -2- Thank you for sending these plans and I,will be in touch with you as soon as I hear anything further. Very uly yours, E IC A. STEARN EAS:sjm cc Bill Chaudoir Scott Derenne Tim Burggren Tim G-eaul 'R A. T STS Consultants Ltd. 540 Larnbeau Green Bay, Wisconsin 54303 (414) 494-9656 June 29, 1983 Mr. Donald C. Wiggins, P. E. 14 South Third Avenue Sturgeon Bay, Wisconsin 54235 STS Job 12535 RE: Subsurface Exploration for the Proposed Boat Ramp in Sturgeon Bay, Wisconsin. Dear Mr. Wiggins: The subsurface exploration for the above referenced project has been completed. This report contains the log of I soil boring. A discussion of the testing and sampling procedures as well as the subsurface'con'ditions enco'u"nteir'ed'are''also presented. This work was authorized in a signed copy of our June 14, 1983 proposal. Three copies of this report have been -sent to the above address. INTRODUCTION A boat ramp has been proposed for construction in Sturgeon Bay, Wisconsin. The site is located east of North Duluth Avenue at Bullhead Point in Sturgeon Bay, Wisconsin. The site was formerly used to load barges with quarry stone, and the existing peninsula was constructed of -this material. Three sunken barges are known to exist immediately southeast of the peninsula. We understand that a concrete boat launching ramp will be constructed near these sunken wrecks. .Driven sheet piling is under consideration to confine the area of the new construction and to provide erosion protection. Soundings will be taken in this area to determine if submerged piles of stone are present that will require dredging. STS Job 12535 ITEM H-2 Page 2 'EDU FIELD PROC RES' The location of the soil boring was selected by Mr. Wiggins, and its approxi- mate location is shown on the Soil Boring Location Diagram -in the Appendix. The location and ground surface elevation at the boring were surveyed in the field by others under the direction of Mr. Wiggins. The ground surface elevation is shown near the top of the boring log in the Appendix and is based on the City of Sturgeon Bay datum. The water level in Sturgeon Bay was at elevation 580.3 at the time of thiS exploration according to Mr. Wiggins. The boring was made by a two-man drill crew using a CME 55 track mounted rotary drilling rig. The boring was advanced as far as practical using solid- stem continuous flight augers. A wash boring technique was then used at greater depths in order to stabilize the bore hole during drilling. Soil samples were taken at 2-foot intervals to a depth of 10 feet and at 5-foot intervals thereafter. The soils were sampled in general accordance with"ASTM Specification D 1586,- "Standard Method for Penetration Tests and Split Barrel Sampling of Soils". A brief description of this sampling procedure is contained in the Appendix. The depth at which groun dwater was encountered while drilling and sampling was observed. Additional water level readings were obscured by the introduction of drilling fluids. However, the depth of drilling mud was measured both before and after removal of the steel casing. These water level observations are shown on the lower left corner of the boring log. ST 6 COWOLTANTS, LTD. ITEM "H - 3" STS Job 12535 Page 3 LABORATORY PROCEDURES The penetration test samples were visually examined by a Geotechnical Engineer to estimate the distribution of grain sizes, plasticity, organic content., mois ture condition, color, presence of lenses and seams, and apparent geological origin. The soils were classif ied according to type using the Unified Soil Classification System. A chart describing this classification system is contained in the Appendix. Res ults of the field and laboratory tests were then plotted.on the.boring log. This log is contained in tile Appendix. Similar soils were grouped into strata on the log. Please note that the strata contact lines represent approximate boundaries between soil types; the actual transition between soil types in the field may be gradual in both the horizontal and vertical directions. SITE CONDITIONS The soil boring encountered approximately 2 inches of topsoil underlain by quarry stone fill. This fill consisted of a @il'ty'fine to co6'rse''s*ahd'C'6'h- taining gravel to a depth of about 10.0 feet. Organic silt was intermixed with the.fill between depths of 4 and 6 feet and-between 8 and 10 feet. Thi.s layer of fill was in a medium dense to dense condition. A sandy limestone gravel fill material was'then encountered between depths of approximately 1010 and 18.0 feet. Organic silt was present in this layer above a depth of about 12.feet. This gravel fill was in a dense to very dense condition and a boulder was encountered between depths of 16.5 and 17.5 feet. The fill was underlain by STS CONSUVrANT8, LTV, 11H .411 STS Job 12535 'ITEM., Page 4 an extremely dense silty sand deposit. The soil extended to the termination depth of 21.0 feet. A more complete description of the soils encountered is shown on the boring.log in the Appendix. Groundwater was encountered at a depth of about 3.5 feet while sampling. Before and after casing removal, the depth to standing drilling mud in the 0pen bore hole was also 3.5 feet. We anticipate that the groundwater table at this site will be very near to the level of Sturgeon Bay. The groundwater table at this site can also be expected to fluctuate with the level of the Bay. GENERAL This 'report contains information based on the data obtained from one soil, boring. Variations can occur around this boring, the nature and extent of which may not become evident until construction. Water level readings have been made in the boring at the times and under the conditions stated on the boring log. However, it must be noted that the period of observation was relatively short and that seasonal and annual fluctuations in the level of the groundwater will occur.. This work was performed in accordance with generally accepted soil and foun- dation engineering practices. No other warranty, expressed or implied, is made. STS Consultants Ltd. was not asked to perform professi.onal..s.erv.ic.e.s beyond preparation of the boring log and a short report outlining the procedures used to obtain that information. However, we would be pleased to provide you with design recommendations upon request. STS CONSULTANTS, LTD. STS J Iob 12535 ITEM "H-5" Page 5 We have appreciated the opportunity to provide these services for you. If you have any questions regarding the information in this report or should you require any additional-services on this project, please feel free to contact US. Yours very truly, STS CONSULTANTS L TD Greg N. Terdich Assistant Project Engineer Jame s J. Botz Geotechnical Group Manager GMT/dw ITE'M "H - 6" APPENDIX 1. Soil Boring Location Diagram 2. General Notes 3.- Procedures Regarding Field Logs, Laboratory Data Sheets and Samples 4. Soil Boring Log 5. Unified Soil Classification Chart 6. Penetration Testing Procedure STS CONSULTANT6, LTD. ITEM "H-7" -/-:)I L 4p STS COiNSULTANTS LM. 540 LAMBEAU STREET GREEN BAY, WIS. 54303 N C) 0 t--A T 1-7- ITEM "H-8" GENERAL NOTES DRILLING & SAMPLING SYMBOLS: SS Split Spoon - 1 3/8" I.D., 2" O.D.. unless 03 Osterberg Sampler - 3" Shelby Tube otherwise noted HS Hollow Stem Auger ST Shelby Tube - 2" O.D., unless otherwise noted WS. Wash Sample PA Power Auger FT Fish Tail DB Diamond Bit - NX: BX: AX RI3 Rock Bit AS Auger Sample Bs Bulk Sample JS Jar Sample PM Pressuremeter test - in situ VS Vona Shear Standard "N" Penetration: Blows per foot of a 140 pound hammer falling 30 inches on a 2 inch OD split spoon, except where noted. WATE R LEVEL MEASUREMENT SYMBOLS: WL Water Level WCI Wet Cave In DCl Dry Cave In WS While Sampling WD While Drilling BCR before Casing Removal ACR: After Casinq Removal AB : After Boring Water levels indicatedon theboring logsare the levels measuied in the boring at the tirnes indicated. In pervious soils, the indicated elevations are considered reliable ground water levels. In impervious soils,-the accurate-determin3tion Of ground water elevations is not possible in even several days observation, and additional evidence of ground %voter elevations must be sought. GRADATION DESCRIPTION & TERMINOLOGY: Coarse Grained or Granulas Soils have more than 50% of their dry weight retained on a 7q1200 sieve; they are described as: boulders. cobbles, gravel or [email protected]. Fine Graineo Soils have less than 50% of their dry weight retained oqna 0q#200 sieve; they re described as: clays or clayey silts if they are cohesive. and silts if they are non-cohesive. In addition to graclation. granular soils are defined on the basis of their relative in-place density and fine grained soils on the basis of their strength or consistency, and their Plasticity. Major Descriptive Termq(s) Component q10f Components Also Percent of Of Sample Size Range Present in Sample) Dry Weight Boulders Over 8 in. q1200mm) Trace 1 -9 Cobbles 8 in. to 3 in. Little 10- 19 q1200mm to 75mm) Gravel 3 in. to 6q#4 sieve Some 20-34 (75mm to 2mm) Sand #4 to #200 sieve And 35-50 (2mm to .074mm) Silt Passing # 200 sieve qfO.074mm to 0.005mqm) Clay Smaller than 0,005mm CONSISTENCY OF COqlqiESIVqF SOILS: RqFLATqIqVE DENSITY OF GRANULAR SOILS: Unconfined Comp. Relative De0qa0qi2q@2qi0qx Strength, Ouq. qisf Consistency N - 8 qlows/f t. < 0.25 Very Soft 0q-q3 Very Loose 0.25-0.49 Soft 4 - 9 LqQcqtse 0.50-0.99 Medium (Firm) 14q0q-29 Mediqtqim Dqensqo 1q.00q- 1.99 Stiff 30q-49 Dense 2.00 - 3.9qD Very Stiff 50-0q80 Very Dense 4.00 - q8.q0q0 Hard 80+ Extremely Dense > q8q.q00q0 Very Hard ST6qS Consultants Ltd. IT E-M....11-H - 911 PROCEDURES REGARDING F1E1,D LOGS, LABORATORY DATA SHEETS AND SAMPLES In the process of obtaining and testing samples and preparing the report, proce- dures are followed that represent reasonable and accepted practice in the field of soil and foundation engineering. Specifically, field logs are prepared during performance of the drilling and sampling operations which are intended to portray essentially field occurrences, sampling locations and other information. Samples obtained in the field are frequently subjected to additional testing and reclassification in the laboratory by more experienced soils engineers, and differences between the field logs and the final logs exist. The Engineer preparing the report reviews the field and laboratory logs, classifi- cations and test data, and in his judgement in interpreting this data, may make further changes. Samples taken in the field, some of which are later subjected to laboratory tests, are retained in our laboratory for sixty (60) days and are then destroyed unless special disposition is requested by our client.- Samples-retained over a long period of time, even in sealed jars, are subject to moisture loss which changes the apparent strength of cohesive soil, generally increasing the strength from what was originally encountered in -the field. Since they are no longer representative of the moisture conditions initially encountered, an inspection of these samples Could recognize this factor. It is common practice in the soil and foundation engineering profession that field logs and laboratory test data sheets not be included in engineering reports, because they do not represent the engineer's final opinion as to the appropriate descriptions for conditions encountered -in the exploration and testing work. On the other hand, we are aware that perhaps certain contractors and subcontractors Submitting bids or proposals on work might have an interest in studying these documents before submitting a bid or proposal. For this reason, the field logs will be retained in our office for inspection by all contractors submitting a bid or proposal. We would welcome the opportunity to explain any changes that have and typically are made in the preparation of our final' reports, to the contractor or sub-contractors, before the firm submits its bid or proposal, and to describe how the information was obtained to the extent the Contractor or subcontractor wishes. Results of laboratory tests are generally shown on the boring logs or are described'in the text of the report, as appropriate. STS Consultants Ltd.- ITEM "H-10" LOG OF BORING NO. I OWNER ARCI TECT ENGINEER City of Sturgeon Bay Donald C. Wiggins SITE PROJECT NAME Sturgeon Bay, Wisconsin Proposed Boat Ramp SSIV UNCONFINED CIPAVRES C SlR[NGTH TONS/fT.' q0 2 3 4 5 EqS DESCnIPTION OF MATEMAL I t- M >- PLASTIC WATER LIOUID > U) LIMIT % CONTENT % LIMIT > X_ W SIANDARD "N" PINURATION (OLOWS/fT.1 SUFAFACL ELEVATION-1 583.5 D 6q0q-q- 10 21 1) A0 50 I opso I I : _'Brown Sandy s i I t (ql`qlqLq)_-0qTq5-tqFq_t.ra cc of roots q6 ri'd qSS I,' q_ !_orqgani 2 SS 1 qTq7 Fill: Brown silty fine to coarse sand (SMq)-with a little to F -a some limestone gravel-interinixed with a little gray organic silt (OL) between 4 and q6 feet and between q8 and 10 feet- n1olst becoiainqg wet below 4 feet-medium dense to dense 4 SqS q5 SS .. ..... ... q6 qSqS A3 Fill: Gray sandy limestone gravel (Gp)-with trace of silt- intermixed with a little gray organic silt (qOL) above 12 feet- Wet-dense to very dense-boulder from 16.5 to 17.5 feet T, 7 SS Grayish brown very silty sand (S.1q1)-with a little gravel- moist-extremely dense .q0 1 SS End of Boring Boring advanced to 8.0 feet with solid-stem auger Boring advanced from 8.0 to 21.0 feet with roller bit and Revert drilling mud 12.5 feet of IN casing used qVq.q1ATFqFqI qLCVEL OBSERVATIONS DonqING b-8q20-83 W.L. 2q3q.8q@q' 8qW0qS STS CONSULTANTS LTD. qnqoqlqlqIqNqGq. CqOMPL0qUqLD 4q6q-20q-83 -2qA-L 8q3. 2q@q1+q1q1CqR 2q3. 8q5q, q4q. A.C.q"q. 5q.q10 LAqN1q1q3EAU STREET nqiqcq; q_0q_ 18q1 GRqI6q1.1q1 BAY, WIS. 54303 _PRAWN 4qSq10q14q0 qAqPqPqRqOqVqCq0 G8qi12qf12qf Jolt q.q1 qsqiqiqFqfqi r +qIqfqlqu4qd-4qleqvqe 0q-qS -_ 6q_q_q_24qF0q2 5 3 -5 1 or I Tqhqe stratification lines rqeprqeqrqent the qappqroxqimqitqe qIq)oqtqiqnclqaqry qIq)qeqIwqiq_q.qcn sqoi! types aqnq(qi qIhqn tqrqanqsqiqfqlon may be gradual. ITEM "H-11 U N I r-1, M 0 SOIL CLASSIFICATION SYSTEM Group Majoc clivisions symbeals Typical namets Laboratory classifiurtion criteria Well-graded gravels, gravol-sand D60 ID30) 2 GW Cu @ greater than 4: Cc-b- W Z mixtures, little or no fines c D10 10 XD,,, between I and 3 o 76 .0 C C0 c UZ Poorly graded gravels, gravel- 0 Not meeting all gradation requirements for GW Gp sand mixtures, little or no fin(.s T N Z tn C -M c*D Silty gravels, gravel-sand-idt W C ea 2 Atterberg limits below "A" > Lo eu ME0 mixtures Q line or P.I. less than 4 E 6 p @Z M Above "A" line with P.I. 0L) ,Z .0 betiwen 4 and 7 are bor- 3: .0 Z E derline cases requiring use 0 > C Z Clayey gravels, grave I -sand-clay Lp Atterberg limits above "A" of dual symbols L GC I mixtures . . . line with P.I. greater than 7 M E 2 0 0)2 C D60 Well-graded sands, gravelly (D 3 C SW -W .2 Cu=67- greater than 6; Cc-b- between I and 3 sands. little or no fines > t; . . . 0 -r. C M . . . 60 C -2 C c V30 >2W M 7; S! L) !E Poorly graded sands, gravelly r4 0 SP C --. ::: Not meeting all gradation requiremenir foe SW 0 Z sands, little or no fines R-0 -0 0 Z Lq C: d 01 CLC Atterberg limits below "A" 0 SM - Silty sands. sand-silt mixtures T C'L line or P.I. less than 4 Limits plo"ing in hat6hed E to C U-) u 0 zone with -P.I. betwr-en 4 S! 9 a 0 C'V C1 E-:;4c > -U -5 C'4 and 7 are borderline ca,---, 'Z3 E requinng use of dual sym. Clayey sands. sand-claV mix- R a Atterberg tin-tits above "A" bols. t; CX line with P.I. greater tban 7 c, SC turcS Inorganic silts and very fine sands, rock flour, silty or clay- ML ey fine sands or clayey silts 60 with slight plasticity CD Inorganic clays of low -to me- For classification of fine-grained soils and fine fraction of coarse- > dium plasticity, gravelly clays. A) CL 50 grained soils. C ndy clays, silty clays. lean sa Atierberg Limits plotting in- clays hatched area are borderline classi- - CH in fications requiring use of dual - 0 Z tr 40 - symbols' C Z OL Organic silts and organic silty X - Equation of A-line: clays of low plasticity W - LL - 20) 'D PI=0.73 42 E .6- > 30 -0 ic silts. micaceous or Inorgan c MH diatomaceous fine sandy or 'OH zn MH silty soils. elastic silts 20 r > z Inorganic clays of high plas- __CL_ c CH ticity, fat clays _Tr__ E 10 C 7 \4fALa6d0L 4 Organic clays of medium to OH 0 high plasticity. organic silts 0 50 60 70 80 90 100 0 10 20 30 40 Liquid Limit 'E Peat and other highly organic Msticity Chart F5 Pt soils ITEM "H-12" PENETRATION-TESTING PROCEDURE The penetration testing procedure essentially followed ASTM Spec if i cation D 1586-67, "Standard Method for Penetration Tests and Split-Barrel Sampling of Soils". Briefly, the sampling procedure involved driving a 2-inch OD standard sampler 18 inches with a 140-pound hammer freefall.ing a distance of 30 inches. The number of blows required to drive the sampler the firial foot was recorded as the Standard "N" Penetration. This N-value is used by Soils Engineers to estimate the strength and compressibility of the soil. After driving, the sampler was returned to the surface and opened. The length of sample (recovery) was measured and the soil was preliminarily classified according to type by, a Soils Technician. A--representative---portiori.-of.-, each sample was then sealed in a glass jar, labeled, and returned to our laboratory.for further examination and testi ng. STS Consultants Ltd. FED/j c CITY OF TULSA ITEM I-1 NUN PAL A G R E E M E N T THIS AGREEMENT made and entered into this 31st day of May 1974, by and between the CITY OF-TULSA, OKLAHOMA, a municipal orporation, hereinafter referred to as "CITY" and the SEQUOYAH YACHT CLUB, an Oklahoma corporation, hereinafter referred as "CLUB," W I T N E S S E T H: - - - - - - - - - - WHEREAS, the CITY and CLUB did heretofore and on the 17th day of April, 1964, enter into an agreement whereby CLUB was I granted the use.and development of a designated area of land owned by CITY at Yahola Lake, under the terms of which agreement CLUB ,was to use such area for the development of sail boating facilities for a period of ten (10) years;! and WHEREAS, during that aforesaid period of use, the CLUB ;has continued to use and improve the facilities leased to it in strict accordance with all the terms conditions and limitations ,imposed within the terms of the! aforesaid lease agreement; and WHEREAS, the CLUB now desires to renew the lease of such property for the ten (10) year period beginning April 17,l974, I !and continuing to and including April 16, 1984, and CITY believes such a lease agreement to be in the best interest of all parties ,'involved; NOW, THEREFORE, the parties hereto enter into an extension of said lease agreement under the following terms and conditions: 1. For and in consideration of the sum of One Dollar ($1.00) ;:and the covenants and agreements hereinafter set forth, receipt of ;'which is. hereby acknowledged, the CITY does by these presents demise, lease and let unto the CLUB the use of a site for a.club- :;house and docking facilities on the shore of Yahola Lake, the site being the same as that occupied by the CLUB at the time of the signing of this contract plus one hundred and sixty-five (165) which shall be an extension of the present enclosed lift area referred to by the CLUB as Dock B southward along the cement curb and wall; said extension to occupy no more area on top of the wall than does Dock B. 2. The CLUB shall hereby be entitled to hold, develop and use the same for a period of ten (10) years from the date of this agree'- ment unless sooner terminated pursuant to provisions hereinafter contained and subject to the following conditions and covenants: a. The CLUB agrees that all improvements made to or constructed upon said property shall be and become the pro- perty of the CITY, (subject to the provisions of -subparagraph f, hereinafter), and said CLUB shall keep said premises and improvement's in good condition to the satisfaction of the CITY.': b. The CLUB agrees that its clubhouse and all sewer facilities which may be constructed by tl CLUB will be.. constructed and maintained in a manner approved by the City Engineer and by the Commissioner of Waterworks and Sewerage. ITEM "1-2" C. The CLUB agrees that its use of-the premises leased herein will be subject to all rules and regulations of the CITY and of the Park & Recreation Board of CITY, and it is specifically agreed that CITY shall have the right to make inspections of said premises at any reasonable time and for the purpose of enforcing the ordinances, rules and regulations of said CITY, and the provisions of this agreement, and CITY shall have the right to enter upon said pre-mises at any reasonable hour. d.* The CLUB hereby acrees to indemnify CITY against any and all -liability, loss or claim for any, personal inj 3uries that may be sustained on said premises or on said lake or lakes! in operating its boats or those of its members. e. The CLUB may erect and maintain for its sole use, a. suitable pierand necessary boat docks or anchorages'along the east side of Lake Yahola, directly west and opposite the above described premises, said pier not to project further than t two hundred (200) feet into said lake 'from the"pr6tent cemen curb and wall of said lake. f. This lease may be terminated by CITY by giving sixty (60) days' notice in writing to the CLUB of its intention to terminate, if in the judgment of the Board of Commissioners of the CITY it is necessary to use the.above described pre- mises for a public purpose, but not otherwise. In the event CITY terminates and cancels said lease by reason of the neces- sity to use said premises for.some public purpose, CLUB agrees to give up peaceable possession of the.premises-to CITY, pro- vided that if the lease is terminated prior to the expiration o the primary term hereof, CLUB shall have the right to removei: f any and all improvements placed or constructed thereon by CLUB,@, provided such removal is accomplished within sixty (60) days after.receipt by CLUB of notice to terminate this lease. g. -.CLUB shall not assign this lease or sublet the premises or any part thereof, without the written consent of CITY first had*and obtained. h. CLUB further agrees, during the life of this agreement;, to maintain at CLUB's'expense and.in full force and effect, insurance policies written by somd insurance company authorized@, to do business in the State of Oklahoma, in such-form and with such endorsements necessary to protect CITY against any and all,' loss, claim or expense resulting from the use of the premises described herein. To this extent, CLUB shall obtain a liabil- ity insurance policy having limits of not less than $100,000.00@ for any single injury from any sin*g!6 *6 ccident,- $100 ;0*00':'00 for@: multiple injuries from any single accident, and $5,000.00 for property damage resulting from any single accident. Such policy shall reflect therein, the CITY as co-insured of said policy, and must provide for notice to CITY at least. ten (1.0) @days.prior to termination of said policy for any reason. Until@ ch policies or-certificates of same have been approved by the: S-U City Attorney and filed with the City Auditor of the CITY, this'@ agreement shall be without force and effect. In the event of cancellation or termination of any of t1he aforesaid policies i of insurance, this agreement shall immediately become null and void. -2- ITEM I In.the event the dikes of Yahola Lake are damaged as a; result of CLUB's use to support its dock facilities, CLUB shall! be fully responsible and shall repair the dikes to the full and! complete satisfaction of CITY. 3. It is specifically understood and mutually agreed that! CITY has no obligation to maintain the water surface elevation of Lake Yahola within any specific range. k. The CLUB agrees that it shall not obstruct the right- of-way of vehicles on the dike which are engaged in CITY's business. IN WITNESS WHEREOF, the parties hereto have executed this- agreement in multiple copies on the date first hereinabove written.! CITY OF TULSA,'OKLAHOMA, a municipal corporation By Mayor "ATTEST: City -Auditor ":APPROVED: Ile city Attorney Chariman, Tulsa Park and ;,Recreation Board "CITY" SEQUOYAH YACHT CLUB, an Oklahoma Corporation /J President ATTEST: 17 . "CLUB" Secretary -3- DATE DUE GAYLORD No. 2333 PRINTED IN US A. 3 66 14108 2778