[From the U.S. Government Printing Office, www.gpo.gov]
RIVERFRONT DEVELOPMENT STUDY AND MASTER PLAN FOR THE CITY OF MARYSVILLE APRIL 1986 This document was prepared in part through financial assistance provided by the Coastal Zone Management Act of 1972 administered by the Office of Coastal Zone Management National Oceanic and Atmospheric Administration HT 168 .M5 K. Don Williamson & Associates, Inc. R58 First Street CONSULTING ENGINEERS 110 East Huron Blvd. 1986 MI 48441 Marysville, MI 48040 RIVERFRONT DEVELOPMENT STUDY AND MASTER PLAN FOR THE CITY OF MARYSVILLE APRIL 1986 K. Don Williamson & Associates, Inc. 136 North First Street 110 East Huron Blvd. Harbor Beach, Michigan 48441 Marysville, Michigan 48040 TABLE OF CONTENTS Page TRANSMITTAL LETTER INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . EXISTING WATERFRONT USES . . . . . . . . . . . . . . . . . . FUTURE USES . . . . . . . . . . . . . . . . . . . . . . . . Marina . . * * ' * ' * * ' * ' * * * * * * * * * * * 'III-1 Launching Ramps . . . . . . . . . . . . . . . . . . . . 111-2 Fishing Sites . . . . . . . . . . . . . . . . . . . . . 111-3 Public Access . . . . . . . . . . . . . . . . . . . . . 111-3 Commercial . . . . . . . . . . . . . . . . . . . . . . 111-4 MASTER PLAN . . . . . . . . . . . . . . . . . . . . . . . . IV-1 Marina . . . . . . . . . . . . . . . . . . . . . . . . IV-1 Site 1 . . . . . . . . . . . . . . . . . . . . . . . . IV-4 Launching Ramps . . . . . . . . . . . . ... . . . . . . IV-8 Fishing Areas . . . . . . . . . . . . . . @jk . . . . . . . IV-9 Public Access . . . . . . . . . . . . . ... . . . . . . . IV-11 . - . .'*. . @ZL. ",-'; Commercial Areas . . . . . . . . t, . . IV-12 Erosion Control . . . . . . . . . . . . . . . . . . . . IV-14 IMPLEMENTATION & FINANCING . . . . . . . . . . . . . . . . . V-1 Commercial . . . . . . . . . . . . . . . . . . . . . . V-1 Marina & Launching Ramps . . . . . . . . . . . . . . . V-2 Waterfront & Fishing Access . . . . . . . . . . . . . . v-4 Grant & Grant Agencies & Descriptions . . . . . . . . . V-6 Erosion Control . . . . . . . . . . . . . . . . . . . . V"7 APPENDIX 1 - Direct Spending Impacts of a Marina . . . . . . A/1-1 APPENDIX 2 - Site 2 . . . . . . . . . . . . . . . . . . . . A/2-1 APPENDIX 3 - Site 3 . . . . . . . .. . . . . . . . . . . . . A/3-1 APPENDIX 4 - Cost Estimates . . . . . . . . . . . . . . . . A/4-1 Marina - Site 1 . . . . . . . . . . . . . . . . . . . . A/4-1 Marina - Site 2 . . . . . . . . . . . . . . . . . . . . A/4-2 Marina - Site 3 . . . . .. . . . . . . . . . . . . . . . A/4-3 Launching Ramps - Phase I . . . . . . . . . . . ... . . A/4-4 Launching Ramps - Phase II . . . . . . . . . . . . . . A/4-5 Riverfront Development . . . . . . . . . . . . . . . . A/4-6 Cuttle Creek Picnic Area . . . . . . . . . . . . . . . A/4-7 V,q Di-partment of Commerce Coastal Scrvices Center Library 1234 South Hobson Avenue Charleston,.SC 29405-2413 136 North First Street 110 East Ifuron Blvd. Harbor Beach, MI 48"1 Marysville, M1 48040 (517) 479-6520 K. Don Williamson & Associates, Inc. (313) 364-4520 CONSULTING ENGINEERS March 26, 1986 City of Marysville 1111 Delaware Marysville, MI 48040 RE: Waterfront Development Study & Master Plan Dear Gentlemen: It gives me great pleasure to submit the Waterfront Development Study and Master Plan. This plan reflects input made by the Planning Commission the Michigan Waterways. If you have any questions regarding this plan please do not hesitate to contact me at our Marysville office which is listed above. Sincerely yours, ILLIAMSON & ASSOCIATES, INC. 1) Charles E. Williams, P.E. Vice-President CEW:kmm 1705, 2.1.1 FILE NO. INTRODUCTION The purpose of this study is to recommend uses for the City waterfront and provide the background information, technical feasibility, and cost analysis to support these uses. From these recommendations the City can adopt a Master Plan for the City owned waterfront. This Master Plan is important to coordinate the uses and development of the waterfront. The City must make provisions for uses that depend on the river frontage. The plan can also be the basis for budgeting and setting priorities for improving and fully utilizing this waterfront. This is a timely issue because of the present problems associated with the property and funding available.. The area to be studied is from the Junction Bouy south to Cemetery Road. The shoreline across River Road from the condominiums is not included because it is privately owned. There is consid- erable erosion problems in a number' of areas , conflict of uses, and needs in the community that are not be@lng meet by the present waterfront development. Some of these require immediate attention and others require long range budgeting and planning. In the past there has been a number of discussions, meetings and plans presented concerning various uses of the waterfront. Many of these were involving proposals for a marina. Developing a marina represents the largest and most difficult activity to acCOMplish. A marina has the most stringent requirements for land and water access and acreage. This must be the focal point of any master plan. A site must be identified for the marina and the remainder of the plan developed around it. Later in the report, discussion will be provided as to why a marina should be considered for the community. Another important aspect to be included is an improved launching ramp. The existing launching ramps represent a dangerous condition due to the exposure to wave action. The site also has limited adequate parking. Other aspects that will be identified are improving commercial utilization of the water front, fishing and public access. Cost estimates will be prbvided for@these proposed improvements in the appendix of the report. 1-2 J EXISTIN" WATERFRONT USES An inventory of the City owned waterfront encompassed 7400 feet of river frontage which includes a variety of uses, Junction Bouy to Water Plant This section is presently park area. Tt has steel sliect piling wall, launching ramps, sidewalks along the wall small parking area, and a large open grassed area. Across River Road is a heavily used picnic area and parking for the picnicers and cars with boat trailers. The existing steel sheet piling wall is too low in this area as it regularly experiences flooding. Appioximately,40% of grass area is very wet due to the high water level and low ground level of this area. This area is occassionally used for river watching, but is not used for fishing. Launching ramps have no protection from boat wake and waves in the river. On a busy weekend launching and retrieving boats is very hazardous. A number of boats have been damaged and people injured at this launching site. Water Treatment Plant This area is adequately protected by steel sheet piling which is in good condition. Much of the frontage is occupied by the treatment facilities with two,water intake lines extending out approximately 500 feet into the river. Wastewater Treatment Plant Between the water treatment plant and the new wastewater treatment plant is the old wastewater treatment plant. The building and some of the tanks have been abandoned. The old sludge digesters (2) are being used for sludge storage and one below ground tank serves as the chlorine contact chamber. The sludge drying beds are occassionally being used but their primary function is to serve as backup to the liquid sludge disposal process. Most of these structures can and should be demolished. The sludge drying beds will have to be relocated. The area of drying beds can be reduced but they are intergral to the process. The chlorine contact chamber is presently in use and will require relocation. Old Chrysler Marine Facility The existing building with steel sheet piling wall around it and docks are in good condition. This area has an overhead boat hoist and boat storage in the building. The City owns all of the Chrysler property east of River Road. "Beach" Area The area south of the Chrysler Facility is presently used for beach. This is a low flat area. tt has a small gravel parking area. There is a grassed area for picnicing and sunbathing. A number of storm sewers cross this area. No shore line protection has been built for this area. The beach provides natural protection. South of "Beach" Area to Wilkie Brothers Actory This area is a higher banked area and is experiencing erosion. The erosion has reduced the slope to near the roadway. Through the years this area has been st abilized with rubble dumped along the river bank. The area between the river and the roadway is very narrow eliminating 11-2 much use of the area. The City does own a narrow strip of land on the west side of the River Road (see Drawing No. 1705-02). South of Wilkie Brothers Factory to Cuttle Road This river front is owned by the condominium associations. Cuttle Road to U.S. Border Patro1 This area has existing steel sheet piling wall that has deteriorated to the point of failure. In it pre sent condition, the wall is a hazard. This area is a prime fishing site and generates a large number of cars parking along the road. The southern portion of this section of: the riverfront is high banks and limits access to the river. This high bank area has been protected by rubble slope protection. South of the U.S. Border Partol to Cemetery Road This area is a continuation of the high banks until a small area at the southern end opposite Cemetery Road. Most of the area is to narrow to allow access to the river except at the southern end. This shore line has been protected by use of rubble. 11-3 FUTURE USES There are a number of future uses that need to be included in the Master Plan. This section will discuss the reasons for including these uses and the requirements for each use. The uses to be discussed are the marina, upgraded launching facilities, fishing and public access with adequate parking, and commercial activities. MARINA A marina represents a whole new industry to the City of Marysville. When you look throughout the state of Michigan and the U.S. there are very few communities that are blessed 4ith the natural resource that Marysville has - that being the St. Clair River. Marysville is one of the only cities, espically its size, in the state of Michigan that has the potential to develop a marina and that has not. Marinas represent a very valuable economic activity, a whole new industry for the City. A study done by the Michigan Sea Grant College Extension Service has a computer program that predicts the spending impact of a marina. This program is based upon a number of studies that the Extension Service and Michigan Waterways has conducted. Based upon their numbers the total annual craft related expenses for a boat are categorized as follows: Power 20'-25' Power Greater Sail boat Greater Than 2.5 Feet Than 20 Feet Annual Craft Expenses $1,773 $3,598 $2,800 Trip Expenses Per Day $ 84 $ 119 $ 48 When'these figures are multiplied by the typical days per year of use, the average annual expenditure on the@I;boat and J_rip expenses are slightly over $8,000.00 per boat. Obviously not all of this spending would be in the City of Marysville, but a significant percentage of that could be. A marina of about 100 slips, with a typical size mix represents annual expenditures of approximately $800,000. The analysis as provided by the Michigan Sea Grant College is included in Appendix 1. The question arises where do all of these boats come from. In St. Clair County there are over 2,200 boats over 20 feet in length registered to residents of the County. Many of those boats are owned by Marysville residents. But because there is no marina facility here or adequate launching ramps, people are using them elsewhere. These boats are kept in Port Huron, Sarnia, and even St. Clair. Another aspect of providing a marina is the improvement in the quality of life. This adds to Marysville uniqueness and takes advantage of the beautiful river. Instead of making a negative statement about the-quality of life and the lack of marina facility in the community, providing a marina, especially a first class marina as proposed, makes a definite positive statement for the City of Marysville. LAUNCHING RAMPS New launching ramps are needed as documented in the existing uses. The present launching ramps are inadequate and represent a dangerous condition. They definately need to be replaced or upgraded. There is a tremendous demand for use of these inadequate launching ramps as can be witnessed during the summer months. Launching ramps can also have a significant economic impact upon the community. In St. Clair 111-2 County there are over 4,000 boats alone that are in the trailable size range that could be launched at this facility. The trailable boat is the fastest growing segment of the boating population. Another factor that is important is that Marysville represents the only launching facility on St. Clair River, north of St. Clair. There is a 12 - 15 mile stretch of river with Marysville as the only launching facility. It is the only launching facility to service some of the greatest pickerel fishing in the world. So the natural demand in combination with the growing number of trailable boats, makes it easy to see that an upgraded and enlarged facility is necessary. FISHING SITES With the great fishing in the St. Clair River especially along the Marysville frontage, fisherman are going to get to the river and do their fishing. But by providing improved access sites, the City will better serve these fishermen, have better control of them and make it easier to police their activities. The Michigan Department of Natural Resources has recognized the value of providing quality fishing near home and is placing a greater emphasis on funding these type of activities. The advantage of improvements is evident in the areas that the City of Port Huron has provided in Pine Grove Park and around the Municipal Office Center. Along with providing improved access to the fishing sites, adequate parking, waste recepticales and benches are needed. PUBLIC ACCESS The general public should be provided access to the river. The public will obviously be able to utilize the fishing access 111-3 sites. But additional provisions should be provided for passive activi- ties, such as boat, bird, and nature watc hing. The value and the demand for these activities can be witnessed at the "beach" area on any winter day when a continual string of people visit the site to watch and feed the birds. In the summer the same area is extremely busy with boat watchers, sunbathers and people walking the beach. To support these areas adequate parking must be provided. By providing adequate off-street parking for the public access and the fish sites, parking can be removed for the streets. This will eliminate traffic conflicts and parking on private properties and improve the area esthetics. Another need that has to be included in the plan is for not only parking access but access for walking, jogging, and bicycling. Improved paths, such as a bike path, should be provided to connect the various city areas along the river and the City Park. Eventually these bike paths could be tied into an overall bike system throughout the community so that the bike paths in the residental areas would feed into these bike paths along the water-frbnt. On a nice summer night the number of bikers in the community can be witnessed coming to and from the riverfront. By separating them from the vehicular traffic, a vast improvement of safety and esthics for the biking publiz would be provided. COMMERCIAL Another very importantactivity strived for in the Community is commercial activities. Because of the level of use of the riverfroat areas, commercial activities can be supported and are necessary. 111-4 The City of Marysville has two primary areas of need: 1. A Marine Service and Convenience Store. 2. A Restaurant-Banquet Type Facili@y. No where in the vicinity is there a convient fa@ility to provide service, fuel or food to the boats on the River. With the amount of boating and foot traffic that the launching ramps generate, especially with an improved launching ramp, it could easily support a marine service and convience store. A marina facility will great ly add to this demand. A restaurant-banquet facility could fill a void in the City. A combination of this type could compliment the City golf course, marina and launching ramps. If on or near the riverfront and golf course, it would have the aesthetics of the river and activity of the golf course to attract patrons and events. The City has a liquc r license that could be applied for bythe facility operator. 111-5 MASTER PLAN The Master Plan includes provisions for the uses discussed in the previous sections of the report. Each section will individually address the uses and provide the technical,feasibility and summary of the cost estimates. MAR I NA The marina design is based on providing 30 to 60 foot long slips with as many slips as possible incorporated into the design.. All the slips provided will be marketable. This is pvident at all the marinas up and down the river and on the lake. Therefore, the intent is to provide as large a facility as possible. The marina would include provisions for transient and seasonal boaters. The facility would have a building for restrooms and shower facilities, along with an administration office and storage. It would provide conditions within the harbor for no greater than I foot waves. In- cluded would be pump out facilities for removing wastewater from the boats. Gas and diesel fuel facilities would be provided either within the marina or in the adjacent commercial facility. Each slip would have utilities such as electricity, water, and possible telephone. The site would be adequately lighted and have access sidewalks. It would also include parking to support the marina. Three potential sites were identified and evaluated for the marina: Site I is the area between the Junction Bouy and the Water Treatment Plant and east of River Road extending out into the river. Site 2 is the area south of Huron Street and east of River Road. Site 2 primarily IV-1 occupies the area referred to as the beach. Site 3 is the area betWE!en the Junction Bouy and the Water Treatment Plant extending west including the picnic area in the park. See Exhibit I for the location of each site. A layout was developed for each site along with a corresponding estimate of the construction cost. Each site was analyzed to comp arE! the benefits, impacts and the economics. The availability of land for future expansion was also considered. These preliminary findings were presented to the Marysville Planning Commission and the Marysville Marine and Waterfront Development Committee. From these analyses and the meet- it was determined that Site 1 represented the most feasible cost effective site with the least negative impacts. It is also the most politically acceptable site. Analysis of Site 1 and the proposed development is discussed on the following pages. A summary of each analysis and a preliminary lay- out of Site 2 and Site 3 is included in Appendix 2 and Appendix 3. Appendix 4 in cludes the cost estimates for the various sites and othE-r PTOPOsals included in this Study. A cost comparison of the three sites is listed below. The best method of comparing the cost of the three sites, with varying number of wells, is to compare the cost on a per well basis: Number of Total Project Cost Per Slips Cost Uell Site 1 106 $ 1,909,020.00 $ 18,010.00 Site 2 85 $ 2,071,608.00 $ 24,375.00 Site 3 143 $ 2,870,550.00 $ 20,075.00 IV-2 MARYSVILLE WATERFRONT DEVELOPMENT STUDY MASTER PLAN Junction Bouy Restaurant North SITE 3 Marysville City Park Picnic Area SITE 1 0 0. Marysville Water Treatment Plant Huron Boulevard Marysville 0 POSED Wastewo'te-r Treatment Plant 0 LAUNCHING=RAMPS Old Chrysler Marine Facility Existing Beach Area i: iSITE 2 jjE EXHIBIT 1 eOld C1 @ILLIAMSON & ASSOC., INC. 9w K. DON W D CON3ULTING ENGINEERS HAN" DUCK SITE Site 1 is delineated on Drawing No. 1705-01 included in the back of the Study. The property is City owned and utilized for launching ramps and passive park area. It has protection both up stream (Junction Bouy) and down stream (Water Treatment Plant). The proposed site utilizes the existing sheeting along the water treatment plant. The marina would be consistant with the existing recreational land use as the marina would be an extension of the park. With the City owning considerable land west of River Road, this area also has the potential for future expar17 sion. It also offers the land for parking, for both marina use and for the fishing pier and walkway. More land is available adjacent to the north side of the park. The City should consider purchasing the land for future park or marina use. i The most critical aspect of the marina proposal in Marysville is protection from boat wake. This requires a substantial breakwater along the river front due to the wave action and ice flow's in winter. The proposal at Site I includes 520 lineal feet of solid breakwater and 200 feet of floating breakwater. The solid breakwater would be composed of 2 walls of interlocking steel sheet piling driven into the river bottom. These walls would be 12 feet apart and would be filled with stone or excavated materials and have a concrete cap. The elevation of this cap would be 582.5. The river side steel wall would extend one foot above the concrete deck and be capped to pro- vide additional protection from overtopping for pedestrians on the breakwater. IV-4 The floating breakwater is proposed to extend south of the solid wall. It is substituted for the solid wall due to the depth of the water and the protection afforded it by the solid breakwater. This floating breakwater would consist of rubber tires filled with floatation and wired together. It would be anchored to the solid wall and white oak timber piles driven' together to form dolphins. This rubber tired breakwater may require removal in the winter. Removal could consist of a boat towing it inside the harbor. It would not have to be removed from the water only out of the ice flows. The anchorage system would have to be designed to allow for removal in the winter. The floating breakwater would be designed. so that it would have adequate width to reduce the waves to a acceptable level. This floating breakwater substantially reduces the cost of the breakwater in the deeper water. Local labor or other sources of inex- pensive labor could minimize the assembly cost for the floating breakwater. The marina will extend as far west as possible to maximize the size. The proposal includes extending the marina towithin 14 f'eet of the existing River Road. This will require excavation behind the existing sheet piling wall, removal of it, and installation of a new sheet piling wall around the perimeter of the basin. To faci- litate loading and temporary parking along the marina, River Road will have to be widened approximately 20 feet.' This will require upgrading and a new surface for River Road along with the addition of curbing along the east side of the road. A small retaining wall would isolate the marina walkway from the parking and loading lane. The interior walls of the marina, to maximize the area for the IV-5 wells, will be interlocking steel sheeting instead of riprap slope protection. This sheeting will be lighter weight than the break- water sheeting. It will be capped with a concrete sidewalk 6 feet wide. The finger piers off the sheeting would be fixed piers. These piers would be 3 feet wide with steel structural members with wood decking. They would be supported by timber piling driven into the bottom. The remainder of the marina docks would be composed of floating head peirs 8 feet wide and floating finger piers 3 feet wide. They would be connected to the solid wall by adjustable ramps. As proposed. Site I would consist of 106 wells. The following is the mix of the sizes of the wells: 30 Foot Wells 90 45 Foot Wells 1.3 60 Foot Wells 3 TOTAL 106 Future expansion of the marina could be west through the 80 foot wide passage at the north end of the marina. The restrooms and shower buildings wjich would,also include administrative office and storage, would be approximateiy 1500 square feet and include: Number For Men Number For Women Water Closets 3 3 Urinals 2 0 Lavatories 4 4 Showers 3 3 The service dock would include a pump out facility and fuel IV-6 dispensing equipment. Utilities (electricity and water) to each slip would be provided. Docks along the outer walls should include access to telephone connections. Lighting would be provided along the piers and throughout the site. Public telephone would be provided at the restroom and shower facility. As mentioned in the discussion on the solid breakwater, pedestrian access will be provided on the breakwater. This will make for an excellent fishing pier and river access to the public. Provisions included for the fisherman and the public are the 12 foot wide concrete deck with railing on both sides and benches interspaced along the inside of the breakwater. This pier will extend into prime fishing area. The floating breakwater should make an excellent fish habitat. The enlarged deck area at the end of the breakwater will provide a nice facility for watching the boats and observing the river. Access to the breakwater will be provided by a separate entrance to minimize pedestrian traffic in the marina. Parking will be provided in two areas. Parking for the marina, which will be for approximately 120 cars, will be at the southern end of the marina accross River Road. Parking for the fisherman and public access would be at the north end of the park and represent approximately 40 cars. The' detailed cost estimates and analysis is included in Appendix 4. The total estimated proje ct cost for Site I is $1,909,020. The estimated cost per well for Site I is approximate'ly $18,010. JV-7 LAUNCHING RAMPS The launching ramp location is east of the water treatment plant. The location, detailed layout, and parking area are shown on Drawing No. 1705-01. This is a logical location for the launching ramps, because of the existing sheeting providing some protection for the launching ramps and the room for parking. Constructing the launching ramps at this location will require relocation of sludge drying beds to the existing wastewater plant site west of River Road, along with the demolition of some components of-the abandoned wastewater treatment plant. Both of these activities are conducive to the overall objectives of the City as the drying beds should be on the site of the existing plant and the facilities to be demolished are hazards. The demolition of the tankage could be completed at a later time, depending upon the level of funding available. The launching ramps consist of 4 launching ramps with two skid piers. To support the 4 launching ramps, 67 parking spots for cars with trailers would be provided and 30 spots for single cars. The construction details include concrete plank for the launching ramp surface and riprap slope protection along the ramp. The existing sheeting would be cut to provide an opening for the launching ramps. Protection would be provided for this area by floating breakwaters. This is an excellent application of floating breakwater, as the sites for the breakwater is extremely protected from ice and current and they will adequately diminish the wave action in the area. The driveways and the area adjacent to the launching ramps, which includes the prepare to launch and tie down lanes, should have asphalt paved surface. The remaining of the parking area could be gravel until funds become available to complete asphalting. FO-ncing in the area would IV-8 be removed and thus allowing for free circulation and improved fishing in the area. Esthetics in the area would be*greatly improved. An area can be set aside for picnicing. Trash containers should also be provided. A side benefit to the launching ramp proposal is the added protection for the existing old Chrysler facility,. The floating breakwaters will make this area a very viable commercial location. It will be a very convenient facility to the launching ramps and an easy area to dock for fuel or other activities. Upgrading this facility could be included in the launching ramp proposal. Restrooms should be provided for the launching ramps. This could be accomplished in this upgraded old Chrysler facility As part of the requirements for commercial leasing of this propeTty, restrooms could be furnished and maintained. This would also provide a monitoring and regular hours-for the restroom facilities. FISHING AREAS St. Clair River along Marysville represents some of the best pickerel fishing in the world. To improve access for fisherman and to allow for better policing and control of those areas, a number of areas are identified for fishing access. A major addition to the fishing access sites would be the marina breakwater access. This represents the area with the best potential.' ,The second good fishing site to be improved is the launching ramp area. This is very popular area with the fisherman. By I improving the parking lot, removing the remanents of the old waste- water plant and the old fencing, this area could be the focal point of the waterfront development. IV-9 The third fishing access site that should receive emphasis is the area along River Road south of Cuttle. This represents a very popular fishing site, but lacks any of the necessary improvements especially adequate parking. The existing sheet piling wall is also failing. To upgrade this site to provide erosion protection and necessary improvements for fishing and public access, the following are needed: 1. New steel sheet piling wall with railing 2. Adequate parking 3. Sidewalk 4. Bike path through area 5. Benches and trash recepticles 6. Fishing pier These could be phased to allow improvements as funding becomes available. Par king and the sheet piling wall are first priorities. Parking,can be accomplished by improving the area south of Cuttle Road on the west side of River Road and north of the U.S. Border Patrol. This is the fairly flat area owned by the City. Pedestrians access can be provided to the fishing area by construction of a ramp on the east side of River Road down to the river level. This will require the addition of approximately 100 feet of sheeting to provide erosion protection in the area and allow more space for the access ramps. This ramp can then become part of the bike path and walkway along the river front. The replacement of the sheeting will allow construction of a railing along the river and an adequate sidewalk.. Trash recepticles and benches should be incorporated into the improvements. IV-10 A long 'range plan for this area would be a fishing pier extending out into the river with an observation deck along the shore line This would extend out into the river allowing access to the fishing. It would be a wood structure with timber piling driven into the bottoin. This would be a focal point for fishing. It has the potential to become a marketing item for the community. The parki ng provisions on the west side of the road would include 74 cars. A sidewalk on the west side of the road to the north end of the parking would cross River Road and have steps down to the river front and the improved area. PUBLIC ACCESS Public access must be provided along with the fishing access for more passive activities, such as bird watching, hiking, sunbathing, and childrens play area. The prime area for this is the area considered the "beach" area. This has a natural beachowith a existing bird populat ion which in the winter includes ducks, geese, and swans. The area requires little capital improvements as there is an existing parking lot se rving this area. This parking area could be paved in the future. This beach area will provide an excellent staging area for the walkway-bike path which should continue to the north and south. Included in this area should be provisions for a childrens activity center. These basic im- provements will enhan6e and encourage the present uses of this area. ,Further to the south of this area, access should be provided. The bank is higher in this area with beach access more limited. But the bike path walkway should continue south through this area to allow access and to contract the area riverfront areas. IV-11 The focal point of this area could be an observation tower. Thi:3 could be located north of Wilkie Brothers where the bank is a higher elevation. This observation tower would be for viewing the river and boats. It could be constructed of telephone poles and treated lumber. It would be an area that people could walk or bike to from either the beach area to" the north or the fishing area to the south. It would provide a gathering point' and resting area for this stretch of the river. The last area to be addressed for public access would be to the extreme south end of this study section. This area is opposite Cemetery Drive, south of the U.S. Border Patrol. This area would make for a nice quiet family picnic area. It would be a good area for small gatherings or a quiet lunch. Parking would be provided across River Road south of the U.S. Border Patrol. This would be the end point of the bike path - walkway along the riverfront- The bike path should continue through all the areas. The sections with narrow frontage and private property,,the path should be installed V D along the roadway. A section of riverfront north of Cuttle Road to Wilkie Brother's Conveyor is private frontage. This could be accom- plished by paving a strip with rumble strip along the edge of the street to delineate the bike path. COMMERCIAL AREAS Two areas represent great potential for commercial development. The first area, which is the old Chrysler Marine Facility, has great potential with the relocation of the launching ramps. The City has in the past attempted to lease this facility with no success. With the added traffic generated by the relocated launching ramps and the IV-12 added protection of the floating breakwater this becomes a high activity area. An area with great commercial potential. This facility could include any of the following activities: 1. Boat sales and rental 2. Boat parts sales 3. Marine service 4. Fishing tackle and bait 5. Convenience store 6. Marine fuel sales The City should determine whether it wants to sell.fuel out of the marina or include it with this center. There is no reason to duplicate the equipment. The City should retain ownership of this property an@. lease the facility to an operator. One suggestion is for the City to include fuel sales in this facility, but to retain a percentage of the fuel sales. The second site with great commercial potential is between the golf course and River Road. This is shown on Drawing No. 1705-03. This is a prime location for a combination restaurant-lounge with banquet facilities. It has the advantage of the traffic from the golf course and the aesthetics of the river. The terrain of the site with some minor grading will allow for a two story facility. The upper lc_@vel could house the restaurant-lounge with the cooking facilities. This would be on the same level as the golf course. This would be conducive to pedestrian and golf cart traffic coming from the golf course. The entrance to the facility would be off River Road or the restaurant-lcunge would be off Golf Course Drive. Additional car parking would be provided adjacent to the golf course parking, this would provide adequate overflow parking for both facilities. It could have a deck to the east IV-13 overlooking the river on the upper level. The lower level could be tile banquet facility. The river side of the building, the lower level, could be on ground level with the potential for a walkout patio. A ramp from the entrance drive to the banquet.facility entrance would be provided to make provisions for both entrances to be handicapped accessable. This facility will also generate additional business for the goll course as it will provide for one day golf outings, meals and entertain- ment. This location should support 300 to 400 seat capacity restaurant- banquet facility. Because this location is surrounded by City owned property, the City should continue to own this property if possible. A long term land arrangement should be sought with a restaurant developer and operator. EROSION CONTROL Erosion control is a concern to everyone on the St. Clair River because of the high water levels and the river current. It would be desirable if the City could afford to install steel sheet piling along the entire river, however, the economics overrule this as a viable option. Each area has to be individually analyzed to determine the extent of the investment and erosion control protection justified by the property values. A number of methods to control erosion are available. Each vary in cost, complexity and effectiveness. Followfng are four commonly used methods: 1. Interlocking steel sheet piling walls 2. Built-up slope with riprap and filter cloth protection 3. Loose placed riprap and rubble 4. Vegetation cover IV-14 The following is a brief overview of these four systems of erosion control. Interlocking steel sheet piling wall is the cadillac type of pro- tection if properly designed and placed. It will provide years of excellent protection. However, this treatment is the most expensived Built-up riprap slope protection consists of placing engineered filter fabric cloth (strong plastic fabric manufactured specifically for this use) with 6" gravel layer placed on top. Outer layers of armor stone are placed on top of the gravel. The armor stone is sized for the specific type and size of wave for each location. This provides stable slope protection and reduces the wave energy. This is especially important for a marina application. This slope treatment requires more room as it has to be installed on a shallow slope. Another problem with this slope protection is that it is very difficult to install where there is a current or large wave action. The currents of St. Clair River makes this difficult to install. Loose placed riprap and rubble slope protection is basically the truck dumped rubble that is pushed over the sides of the banks. For years this has been a preferred method to improve slope stability in a number of locations. From an economic standpoint this has its advantages but aesthetically leaves something to be desired. In many cases this method is of last resort. Vegetation slope stability is the least expensive and most envirom- entally sensitive method. It requires flat slopes and adequate soils to maintain the growth. This method is not satisfactory in cases with severe wave action or high currents. It is not effective in areas that are experiencing erosion problems. IV-15 Each method has its advantages and preferred uses. '['here are many additional variations of the basic treatments. Following are recommendations for each area in the study. Junction Bouy and the Water Treatment Plant This area is presently protected with steel sheet piling wall. With the high water levels, this area experiences periodic flooding. This causes inconvience but no monitary damage. The marina proposal will improve this area and provide the high level of protection required. This should be accomplished with the steel sheet piling. Launching Ramps and the Old Chrysler Facility The existing sheet piling wall and the proposed floating breakwater will adequately protect this area from erosion. "Beach" Area (Old Chrysler Facility to 1,000 feet south) This area has flat slopes and vegetation cover. There is little damage that can be caused by wave action or erosion. The "beach" area provides some natural protection. This area should be maintained as an area with beach and vegetation type of protection. This is a good area to be left as "natural". Area South of the "Beach" to Wilkie Brothers This area is higher banked with little beach. It is experiencing serious erosion problems. The only improvements requiring protection is River Road pavement. The present method of placing loose rubble and riprap should protect the shoreline. But this method will require continual monitoring. After storms or during seasonally high water IV-16 levels the addition of more rubble will be required. This area is of lower economic value, thus does not justify the large capital expendures to provide a higher level of protection. In addition there is insufficient slope to the deeper water to provide riprap slope protection. Cuttle Road Area To provide protection and added room for the fishing area and proposed bike path, steel sheet piling should be utilized. This area has the potential for intense use that justifies the added expense for the steel sheet piling wall. Area Opposite the U.S. Border Partol This area should be protected by rubble until such time that a steel sheet piling wall can be funded. South of the U.S. Border Patrol to Cemetery Road (Cuttle Creek Picni-c- Area) This area should be protected with built-up riprap slope protection. Because it is being proposed for a small picnic area and the river is not too deep at this location, placed riprap slope protection will provide the required level of protection at a reasonable cost. IV-17 IMPLEEMENTAION & FINANCING The implementation of the findings in this Study begins with adoption of the Master Plan. This will provide the framework for the City Staff to begin soliciting funding and interest in developing the various items in the Study. The local recreation plan which Marysville has adopted must be amended to reflect the activities and improvements in this plan. It is then submitted to the State for their approval. This then can become the basis for many of the recreational grants. COMMERCIAL With the adoption of the Master Plan the staff can begin soliciting interest or proposals on developing the restaurant-banquet facility at the riverfront and golf course. This could begin by contacting poten-- tial restaurantuers with successful existing restaurants in other communities. Ads for proposals in restaurant trade publications could also generate interest in the site. The City should consider some basic criteria for the proposals, i.e. leasing particulars, restaurant size or type of menu and responsi- bility of the developer (access drive, parking lot, sewer and water). The City should consider making some of the site improvements such as upgrading the parking lot as a City's economic incentive. The commerical activity at the old Chrysler marina facility should be shelved until a schedule can be identified for the launching ramp improvements. The launching ramp improvements will have such a signi- ficant impact on the facility that all proposals should reflect the higher traffic and better local aesthetics of an improved launching ramps. V-1 MARINA & LAUNCHING RAMPS The marina and launching ramps represent the most capital intensive proposal. The marina - launching ramps will provide: 1. Much needed safer launching ramps 2. More parking for cars with boats 3. Boat mooring facilities 4. Marina and fishing parking 5. Demolision of the old wastewater plant 6. Public access to riverfront and better fishing 7. Better marketability of the old Chrysler facility 8. Source of employment in community The prime source of funds for those improvements is the Michigan Waterways. Presently their grants are a 50% match of local funds. The 50% local match money can be created a number of ways: 1. Through other grants 2. City capital budget expenditures 3. City forces doing the work 4. Bonding with debt reti@ement from marina revenues 5. Bonding with debt retirement from City general funds 6. Bonding with debt retirement from special millage. 7. Bonding with any combination of the above waterways is receiving funding from appropriations of marine fuel. tax money for capital expenditures. Because the state legislature and governor's office has expressed support for funding marina construction due to fte significant economic impact of boating and marina's, Waterways will be a stable source of funding for a number of years. Waterways has established a point system to prioritize marina construction. They are also administer- ing a number of other funds from the Federal government. Marysville should V-2 request funding through Waterways and determine a timetable for funding. Once this is established the City can pursue other sources of money. This is especially important for soliciting other grants to offset the 50% local match. Other grant sources will be listed later in the Study. The economic impact and jobs creation of marinas are well established. This can be the basis for a Small Cities Economic Grant to fund a portion of the project. A grant of this nature can be used to offset the local 50% match. A well run marina will operate at a profit. St. Clair's Marina, which is a comparable size marina which would generate a similar type of boating traffic and volume of business, is a good comparison for projecting Marys- ville's potential revenues and expenses. The following are typical f"gures from St. Clair Harbor Commission for 1985 operations: Income: Charges for Services & Mooring $ 103,068 Sale of Merchandise 157,317 Other 817 TOTAL OPERATING REVENUE $ 261,202 Expenses: Wages & Benefits $ 45,116 Contractual Services 2,000 Merchandise & Supplies 143,938'c Heat, Light & Power 8,276 Other 14,525 TOTAL OPERATING EXPENSES $ 213,855 TOTAL OPERATING PROFIT $ 47,347 *Does not include estimated $18,506 fuel loss through a tank leak. v-3 Through the years the St. Clair Marina has generated a sizeable fund balance of $341,262. Profits from the facility can be used for retiring debt, providing for maintenance and future expansion, additions, and improvements. WATERFRONT Got FISHING ACCESS The additional land available north of the City park should be con- sidered for purchasing. Grant money could be utilized to pay for this addition to the park. Funding for the steel sheet piling wall along River Road south of Cuttle Road has been requested through the Emergency Erosion Co ntrol Fund administered by the U.S. Army Corps of Engineers. This application should be followed up with a contact with the United States Legislators. (De@vid Bonier, Carl Levin, and Bob Traxler, who does not represent MarysvillE@ but is a good contact). The remainder of the fishing access site and parking lots construction money should be requested through the Department of Natural Resources. The Fisheries Division has money available for projects that provide high quality fishing opportunities especially in an urban setting. The other sources of funds listed on the following pages are applicable. To im- prove the chances of receiving a grant and begin to meet the parking needs, the City could initiate construction of the parking lots using City forces to develop a gravel parking lot. The bike path-walkway is a prime candidate for funding through Coastal Management Programs (CMP). CMP programs fund studies (a portion of this Study was funded by CMP) and low cost construction projects. The PlicLigan Departme at of Transportation should also be contacted. They have in the past funded bike paths. The Cuttle Creek Picnic Area could use any of the following IiStE@d sources of grant money for construction. This may be a project within the limits of the City's Department of Public Works forces to do this construction. v-4 The City should encourage local civic groups (1-lions Club, Rotary, Power Squadron, etc.) or encourage involvement from the National Guard to actively participate in these projects. Their backing is important both financially and emotionally. These groups could aid in assembling or purchasing floating breakwaters, benches, children's activity center, observation deck, fishing areas or litter receptacles. The following pages have a listing of agencies and grants available for many of the listed projects. To receive any of these grants from the State the City has to agree to nondiscrimination in hiring and use of the improvements and to provide access for handicapped. The following list is the six goals the Michigan Department of Natural Resources has established in the State's 1985-1990 statewide recreation plan Building Michigan's Recreation Future. Resource Protection Goal: To protect Michigan's natural recreation resources and provide for their public use and enjoyment. Water Access Goal: To provide public access to Michi.-an's water bodies particularily the Great Lakes, and to facilitate their recreation. use. Urban Recreation Goal: To improve outdoor recreation opportunity in Michigan's urban areas. Economic Development Goal: To stimulate Michigan's economy through recreation, tourism and community revitalization. Community Recreation Goal: To meet regional, county, and community needs for outdoor recreation opportunities. Wise Investment Goal: To invest Natural Resources Trust Funds to projects that will yield the best long-term recreation return to the people of Michigan. All of the proposals in this Study fit in these guidelines. v-5 GRANT &.GRANT AGENCIES GRANT DESCRIPTIO _S Michigan Natural Resources Trust Fund (NRTF) Money for land acquisition Michigan Department of Natural Resources and development for recre- Recreation Services Division ational purposes. Maximum P.O. Box 30028 allowable grant is $750,000. Lansing, MI 48909 Local match is 25%. Michigan Land and Water Conservation Fund Money for land acquisition Michigan Department of Natural Resources and development for recre- Recreation Services Division ational purposes. Maximum P.O. Box 30028 allowable grant is $250,000. Lansing, MI 48909 Local contribution to pro- ject is 50%. Michigan Waterways Money for recreational boating Michigan Department of Natural Resources facilities. There is no P.O. Box 30028 set maximum grant. Local Lansing, MI 48909 match is 50%. Michigan Department of Natural Resources Because funding is 'Limited Fisheries Division at this time, there is no P.O. Box 30028 set criteria for this money. Lansing, MI 48909 Coastal Management Program Money for studies and limited Division of Land Resources Programs construction projec,--s. Maxi- P.O. Box 30028 mum grant is $50,000. Local Lansing, MI 48909 match is 50%. Small Cities Block Grant Program Money for economic develop- Michigan Department of Commerce ment especially to create Office of Community Development jobs. Maximum granL is P.O. Box 30004 $750,000 annually. Lansing, MI 48909 NOTE One grant may possibly be used as matching funds for another. V-6 EROSION CONTROL Erosion control will hav e to be addressed continually with the high water level. The areas north and south of Cuttle Road that are receiving rubble treatment will require constant monitoring and intermittant addition of rubble to protect the River Road roadway. This year with all the emphasis on flooding and high water levels, is a good year to be soliciting funds for erosion control projects. v-7 APPENDIX 1 PROGRAM DS-100 (marina.pc) Version 1.00 DIRECT SPENDING IMPACTS OF A MARINA ----------------------------------- MARINE ADVISORY SERVICE MICHIGAN SEA GRANT COLLEGE PROGRAM COOPERATIVE EXTENSION SERVICE ----------------------------------- The direct spending impacts of a marina will be determined by the number of boats of each type to be served. These numbers are: * Power Boats 20-25 feet: 10 * Power Boats over 25 feet: 70 * Sailboats over 20 feet: 20 Marina Location: Marysville, MI Spending data are based on 1982 figures. If you wish to account for the effects of inflation, enter the current year and averagE. annual rate of inflation since 1982. Enter 0 if you wish to use unadjusted values. Current Year: 1985 Annual Inflation Rate: 4% Power Power Sail 20-25 Feet >25 Feet >20 Feet TOTAL BOATING ACTIVITY % Boats by Type 10 70 20 100 Number of Boats 10 70 20 100 Average Boat Days 43 48 46 47 Total Boat Days 430 3,360 920 4,710 SPENDING Annual Craft Expenses Equipment 6,299 80,000 23,240 110,169 Repair 3,487 49,607 7,762 60,855 Insurance 1,924 28,032 4,297 34,252 Storage 6,018 93,622 20,720 120,360 TOTAL CRAFT-RELATED 17,728 251,891 56,018 325,637 Trip Expenses Food 15,962 124,725 32,081 172,768 Lodging 2,418 0 2,070 4,488 Auto Fuel 4,837 86,929 3,105 94,871 Boat Fuel 10,641 154,961 3,105 168,707 Equipment 1,451 18,898 1,035 21,384 Other 967 15,118 3,105 19,190 TOTAL TRIP-RELATED 36,277 400,632 44,500 481,408 TRIP + CRAFT SPENDING 54,005 652,522 100,518 807,045 ------------------------------------------------------------------------------ A/1-1 STATEWIDE SPENDING DATA (enter local data individually, if preferred) Annual Craft Expenses M/boat/year) Equipment 630 1,152 1,162 981 Repair 349 709 388 482 Insurance 192 400 215 269 Storage 602 1,337 1,036 592 1 773 3,598 2,801 TOTAL CRAFT-RELATED @,724 Trip Expenses ($/boat day) Food 37 37 3._6 Lodging 6 0 2 Auto Fuel 11 261 3 13 Boat Fuel 25 4.6 25 Equipment 3 6 1 Other 2 4 3 TOTAL TRIP-RELATED 84 119 48 84 A/1-2 APPENDIX 2 SITE 2 Site 2 is property owned by the City. It is the area of the existing "beach". Unfortunately the City does not own property across the road at this site. Therefore, the area of expansion is limited. The only area available for future expansion would be further to the south. But because of the depth of the river and the height of the roadway, this area is severly limited. Parking is limited due to limited land area available. This site is convenient to the area proposed for the commercial marina service. The Site 2 Proposal is similar to the Site I Proposal in many ways. See Exhibit 2 for the layout. The breakwater will be of similar construction and width thus to allow the fishing and pedestrian access. The floating breakwater at the end is proposed to protect the entrance. It is shorter than Site 1 due to the exposure that it would be subject to. This floating breakwater requirements are the same as that required for the launching ramps. (If launching ramps are constructed first, deduct $34,000 for the floating breakwater from the estimated cost for Site 2). The restrooms and showers would have to be constructed in the area of the old Chrysler facility. This would reduce the commercial potential of this facility. This proposal fully utilizes the site leaving little open space, grass area or picnic area. This site requires excavation inland to maximize the area of the marina as Site 1. Parking would be provided between the roadway and marina. The interior walls would be interlocking steel sheeting A/2-1 of a lighter weight than the breakwater wall. The marina would be composed of fixed finger piers off of the sheeting and floating piers in the remainder of the harbor. The total number of wells for Site 2 is 85. The following is the mix and size of those wells: 30 Foot Wells 73 45 Foot Wells 9 60 Foot Wells 3 TOTAL WELLS 85 The detailed cost analysis for Site 2 is included in Appendix 4. The total estimated project cost is $2,071,608.00. The cost per well for Site 2 is approximately $24,375.00. Site 2 is unacceptable because of limited land area for improvements, costly construction and conflict with the existing use of the site. The beach area should remain as a natural area with beach. A/2-2 MARYSVILLE RIVERFRONT DEVELOPMENT STUDY & MASTER PLAN Floating Breakwater LL G CL L) C M Z Existing Steel North 3:: Sheet Piling Wall E 2 > PROPOSED LAUNCHING RAMPS Existing Beach Floating Breakwater Area a- C, 4' E CL -C .2 m I k 0 85 SLIP MARINA > ILL ad E > C ad E Z 0 V C 0 L) L) a V) 3. Q) SITE" 2 Fl, B r LL 2 VS,/ /E m Exhibit 2 K. DON WILLIAMSON &.ASSOC., INC. CONSUVING ENGINEEnS APPENDIX 3 SITE 3 Site 3 is property owned by the City. The area is contained within Marysville City Park and includes the existing launching ramps and picnic area. This site will require the relocation of River Road, 18" sanitary sewer and water mains. River Road relocation will re- quire additional park land. The sanitary sewer relocation, because of the depth of the sewer, will be very expensive (this sewer is the deepest in the City). The City owns more property to the West and south of this proposed area. This marina could be further expanded in the future to the west but encounters conflicts with relocated River Road, sanitary sewer and water mains. Site 3 encompasses many of the improvements in the Site 1 pro- posal. The solid breakwater will allow limited access to the river. The floating breakwater is proposed to protect the entrance. The existing sheet piling wall would be used for protection but another wall would have to be constructed 12 feet from it and tied to the existing wall. Because this wall is to low for adequate protection, a concrete cap with curb will have to be formed and poured to provide a height of 583.5 feet. Railing would be added on the river side of the wall. The interior walls would be riprap slope proteqion with filter cloth base. This is less expensive but requires more room. Additional dock length is also required. A/3-1 ra The finger piers along the exterior walls would be solid piers. The remaining finger piers (off the head piers) and the head piers would be floating piers. Restrooms and showers would be provided and be similar in size as Site 1 proposal. The parking area at the west end of the marina will eliminate addi- tional park and require the enclosing of an open drain with storm sewer. Some excavated material can be used to fill this drainage course. A large volume of earth excavation is required for this proposal (at the west end of the marina a cut of approximately 20 feet). Disposing of the excess material could pose a problem. Some material will be used to fill for the parking area and some could be used for a toboggan hill in the park but a significant amount of excess material would need to be trucked to another site. The grade differential at the west and north sides will require an abutment wall along the sidewalk to protect the roadway grade. The total number of slips for Site 3 proposal is 143. The mix and size of these wells is as follows: 30 Foot Wells 109 45 Foot Wells 27 60 Foot Well 7 TOTAL WELLS 143 The detailed cost analysis for Site 3 is included in Appendix 4. The total estimated project cost is $2,870,550.00. The cost per well for Site 3 is approximately $20,075.00. A/3-2 Site 3 is unacceptable because of the conflicts with existing park and picnic area, the relocation of River Road through the park and the higher cost. This park area west of the existing River Road is heavily used for picnicing all summer long. Dedicating this area for marina was opposed by the Planning Commission. This opposition is supported by the City Council and local citizens. The existing use of this property is well supported and backed by the public. A/3-3 -MAR FRONT'DEVELOPME.NT Y V* L 5 T AX MSZ,&R LLAN, cc u0n 0 6" P _rt b ------- --- 36' Storm Sewer - ..0 Sheet PAIng Wall C Marysville City Park S 3-01 alo. olid BreakwaIrter With Access d) 0 WL I P@m 0 C ZA- t &tLn1_.$ Shee no a a- - Vro n.c re' fe,-Cd' 0 P 0: Breakwater L) cr Floating "pit C@ '00 30' 30' 01 45' u 0 0) 1@ cr Showers Existing Laune@ing Ramps Re?trooms Existing Shoot PlOng Wall to TI I II II III II 111' Arv Car Parking LU III II I I SITE 3 '4@ *ExhdX S h Wom- r 0 U_1tMTM1_0 _F 0 Water Tr-nim- plant & ASSOC., WC. I ^.K.DONWILIJAMSON tuft Mop APPENDIX 4 COST ESTIMATES APRIL 1986 Marina - Site I Solid Breakwater with Concrete Cap & Railings $468,000 Floating Breakwater with Dolphins 40,000 Interior Steel Sheet Piling Wall 149,400 Excavation 132,300 Sidewalk 29,700 Floating Head Piers 126,720 Solid Finger Piers 36,450 Floating Finger Piers 30,000 Restrooms & Showers 165,000 Dock Utilities 106,000 Site Electrical & Lighting 50,000 Mechanical 40,000 Temporary Parking & Loading Lane 11,760 Relocated Street 27,000 Retaining Wall 22,320 Asphalt Parking 25,200 Site Sanitary Sewer 3,000 Site Water Main & Hydrant 3,000 Pump Out Equipment 15,000 Fuel Handling Equipment & Tanks 60,000 TOTAL CONSTRUCTION COST $1,590,850 CONTINGENCIES 318,170 TOTAL PROJECT COST $1,909,020 A/4-1 Marina - Site 2 Solid Breakwater With Concrete Cap & Railings $774,000 Floating Breakwater with Dolphins 22,000 Interior Steel Sheet Piling Wall 129,000 Excavation 144,000 Sidewalk 16,020 Floating Head Piers 108,000 Solid Finger Piers 21,000 Floating Finger Piers 70,000 Restrooms & Showers 165,000 Dock Utilities 85,000 Site Electrical & Lighting 45,000 Mechanical 40,000 Asphalt Parking 26,320 Site Sanitary Sewer 3,000 Site Water Main & Hydrant 3,000 Pump Out Equipment 15,000 Fuel Handling Equipment & Tanks 60,000 TOTAL CONSTRUCTION COST $1,726,340 CONTINGENCIES 345,268 TOTAL PROJECT COST $2,071,608 A/4-2 Marina - Site-3 Solid Breakwater with Concrete Cap & Railings 117,000 Floating Breakwater with Dolphins 16,000 Interior Steel Sheet Piling Wall with Concrete Cap 272,550 Riprap Slope Protection 146,500 Excavation 576,000 Sidewalk 38,520 Floating Head Piers 158,040 Solid Finger Piers 106,200 Floating Finger Piers 109,215 Restrooms & Showers 165,000 Dock Utilities 143,000 Site Electrical & Lighting 80,000 Mechanical 50,000 Enclosed Open Drain 48,000 Relocated Street 57,700 Relocated Sanitary Sewer 91,000 Relocated Water Main 41,000 Retaining Wall 57,600 Asphalt Parking 37,800 Site Sanitary Sewer 3,000 Site Water Main & Hydrant 3,000 Pump Out Equipment 15,000 Fuel Handling Equipment & Tanks 60,000 TOTAL CONSTRUCTION COST $2,392,125 CONTINGENCIES 478,425. TOTAL PROJECT COST $2,870,550 A/4-3 Launching Ramps - Phase I Ramps - Concrete Planks $ 16,500 Skid Piers 7,000 Excavation 8,500 Cut Existing Sheet Pile Wall 4,000 Demolition of Sludge Drying Beds 15,000 Asphalt Drive & Tie Down Area 15,600 Gravel Park ing Area 16,900 Sludge Drying Bed Relocation 32,000 Floating Breakwater 34,000 Landscaping &-Seeding 4,000 TOTAL CONSTRUCTION COST $153,500 CONTINGENCIES 30,700 TOTAL PROJECT COST $184,200 A/4-4 Launching Ramp Phase 2 Asphalt Parking Area $ 24,000 Relocate Chlorine Contact Chamber 35,000 Demolition 20,000_ TOTAL CONSTRUCTION COST $ 79,000 CONTINGENCIES 15,800 TOTAL PROJECT COST $ 94,800 A/4-5 RIVERFRONT DEVELOPMENT COST ESTIMATES Cuttle Road Fishing Access & Parking Steel Sheet Piling Wall with Railing $210,000 Concrete Sidewalk & Deck 33,600 Pedestrian & Bike Ramp 2,000 Concrete Stairway 4,500 Wood Fishing Pier & Deck 12,000 Parking Area - Gravel 10,400 Overflow Parking 6,000 CONSTRUCTION COST $278,500 CONTINGENCIES 55,700 TOTAL CONSTRUCTION COST $334,200 Bike Path Along Waterfront Asphalt with Rumble Strip $ 17,000 Observation Tower Wood Tower & Access Walk $ 5,000 A/4-6 Cuttle Creek Picnic Area Riprap $ 21,800 Parking Area - Gravel 1,800 Landscaping & Picnic Tables 1,500 CONSTRUCTION COST $ 25,100 CONTINGENCIES 5,020 TOTAL CONSTRUCTION COST $ 30,120 A/4-7 K, t, 3 66611 14102 -9454d