<?xml version="1.0" encoding="iso-8859-1" ?>
<doc callnum="HE550 .N42 N8 1984">
<metadata>
	<titleStmt>
		<mainTitle nfc="0"><title>Great Island Common</title>:<titleExt>Master Plan</titleExt>/<respStmt>prepared for New Castle, New Hampshire prepared by Kimball Chase Co. Inc.</respStmt></mainTitle>
	</titleStmt>
	<authorStmt>
		<corpAuthor><name>Strafford Regional Planning Commission.</name></corpAuthor>
	</authorStmt>
	<imprint>[<pubPlace>Portsmouth, N.H.</pubPlace>] :<pubName>Kimball Chase Co. Inc.</pubName>;<pubDate>1984.</pubDate></imprint>
	<classStmt>
		<locClass>
			<subject cat="top">Parks</subject>
			<subject cat="geo">New Hampshire.</subject>
		</locClass>
		<locClass>
			<subject cat="top">Parks and recreation</subject>
			<subject cat="geo">New Hampshire.</subject>
		</locClass>
		<locClass>
			<subject cat="top">Parks</subject>
			<subject cat="gen">Public Access</subject>
			<subject cat="geo">New Hampshire.</subject>
		</locClass>
		<locClass>
			<subject cat="geo">Great Island Common (N.H.)</subject>
		</locClass>
	</classStmt>
</metadata>

<text xml:space="preserve">
<pb n="1" />

                                 MASTER PLAN

                         ""GFEAT ISLAND COMMON

                                NEW CASTLE, N.H.

                                       DECEMBER 1984

                                        A

                    KIMBALL CHASE CO. INC.              PORTSMOUTH           N.H.
                    The New Hampshire Coastal Program provided a grant for the preparation
                    of this report, which was financed in part by the Coastal Zone Management
                    Act, administered by OCRM, NOAA.
<pb n="2" />

                                          TABLE OF CONTENTS
                                  MASTERPLAN - CGREAT ISLAND COMMON$
                                                                               PAGE

           Part I - Introduction and Site Recommendations                         1

           Part 11    Recreation Building and Restroom Facility
                                    Arcbitectural                                 5

           Part III    Recreation Building and Restroom Facility
                             Mecbanical and Electrical                           11

           Part IV    Cost Estimate Summary                                      18
<pb n="3" />

                                             GREAT ISLAND COMMON
                                                  MASTER PLAN

             INTRODUCTION

             Great Island Common was or1g1nally developed as a military base,                     Its
             roadways, grounds, and buildings were used by the military through the second
             world war.    During the 1950's, the Common was turned over to       the Town of New
             Castle and has since been used as a park.        Much of the park is in disrepair
             and needs extensive revitilization.

             Our plan calls for restoring and expanding the present buildings and
             recreational facilities, as well as providing more parkin            g,   The plan is
             designed to emphasize the sites natural beauty.        Paths follow the landscape's
             curves, parking is directed away from waterviews, and recreational areas are
             screened for greater privacy.      Wooden guardrails and signs preserve the site's
             rustic quality, while plantings such as Beach rose and Russian olive enhance
             its character as an oceanside park.

             GENERAL SITE RECOMMENDATIONS

             Park Entrance:     The chaln-link fence should be removed and replaced with a
             wooden guardrail.    This is an aesthetic change that would greatly improve the
             image of Great Island Common.         A new wooden entrance sign should also be
             installed along with two wooden post-and-boam vehicular control gates, one at
             each entrance. Finally, the gate house roof should be repaired.

             Nature Trail: While it may need better maintenance, the nature trail appears
             to be in good condition.      However, a sign should be installed at its entrance
             to make park users aware of its existence.        Pine trees should also be planted
             to screen the trail from an abutting property.

             Playground:    The existing play equipment is in disrepair, and randomly placed
             in the North West corner of the Common. We recommend that a new playground be
             built in the   same location. This new playground would have an asphalt walk
             defining the   play areas.   A new wooden climbing structure would be installed,
             and the existing playground equipment repaired and reset. The existing chain-
             link fence should be removed and replaced with wooden guardrails.

             Reetroom Facility:       Due to the increased use of the park, the restroom
             facility should be expanded to accommodate two additional womens stalls and
             two additional mens urinals.       A ramp would provide handicap access from the
             parking area.    New plantings should be introduced around the building.            (see
             Mechanical Electrical Section.)

             Rock Jetty: The rock jetty is in good condition; however, there is persistent
             erosion to the north of it. Rip-Rap and fill would stabilize the area.

             Water View:    This stretch of roadway paralleling the ocean is one of the parks
             greatest assets.      Benches and plantings at the water's edge would take
             advantage of the view.     To prevent cars from parking along the shoulder of the
             roadway, a wooden guardrail should be introduced with openings for pedestrian
             access.   A small parking area across the street would satisfy requirements for
             parking.
<pb n="4" />

            New-Shelters:   The two new shelters are located in areas that are close to
            existing parking lots, and have panoramic views of the Piscataqua River as it
            joins the Atlantic Ocean.     It is recommended that these new shelters be
            constructed exactly as the existing shelter. This insures a consistent
            shelter appearance.

            New Parking Lots:    The new gravel parking lots will alleviate some of the
            overcrowded parking conditions. These have been located so as to allow pedes-
            trian movement to the most heavily used areas of the park.    Plantings should
            be introduced to provide buffers between the parking and picnic areas.

            New Ice Skating Rink &amp; Tennis Courts: As a result of the high watertable, the
          ,,-existing tennis courts have deteriorated and are unusable.      The existing
         i  tennis courts and concrete wall should be removed and replaced with an Ice
            skating pond. This pond is curvalinear in shape to accentuate the existing
            landforms and character of the area.

            The two new tennis courts are to be located in an open field to the south of
            the pond entrance.   Plantings in this area should buffer the tennis courts
            from Wentworth Road.

                 L

                                                   2
<pb n="5" />

                                       SITE RECOMMENDTIONS COST ESTIMATE

              PARK ENTRANCE

              Remove C.L. Fence                      1000 LF @ $1/LF                    $1,000
              New Wood Guardrail
                    (state Spec.)                    1000 LF @ 8.50/LF                  $8,500
              New Wood Gate
                    (state Spec.)                    2 @ $1,000 EA                      $2,000
              Gate House Roof                        1 @ $500                           $ 500
              Entrance Sign                          1 @ $600                           $ 600
              Misc. Plantings                        - (a $500                          $ 500
              TENNIS COURTS &amp;    GRAVEL PARKING                                         $13,100

              Excavate 12" (Parking)                 350 CY @  $3/CY                    $1,050
              3/4" Gravel 12"                        350 CY @  $8/CY                    $2,800
              Excavate 16" (Tennis)                  780 CY @  $3/CY                    $2,340
              3/4" Gravel Base 12"                   625 CY @  $8/CY                    $5,000
              1/4" Crushed Gravel 4"                 156 CY @  $14/CY                   $2,184
              Hot Top (Base) 2"                      1600 SY x 2 x .057 =               $7,280
                                                     182 @ 40 Ton
              Hot Top (Wearing)    1"                1600 SY x 1 x .057 =               $3,648
                                                     91 @ 40 Ton
              C.L. Fence (12' HT.)                   650 LF @ $11 LF                    $7,150
              Surface Paint                          2 @ $1,000 EA                      $2,000
              Nets                                   2 @ $800 EA                        $1,600
              Planting                                                                  $3,000
              ICE SKATING RINK                                         TOTAL            $38,000
              Demolish Tennis                        1600 SY @ $2/SY                    $3,200
              Demolish Wall                                                             $5,000
              Escavate 24"                           1600 CY @ $2 CY                    $3,200
              Planting associated                                                       $2,000
               w/this area
               Wood Benches                          4 @ $400 EA                        $1,600

              Paths Associated
               w/this area                           700 SY (a $5/SY                    $3,500
                                                                                        $18,500

              PLAYGROUND

              Remove C.L. Fence                      250 LF @ $2/LF                     $ 500
              New Wood Guardrail                     250 LF @ $8.50/LF                  $2,125
              Bit. Conc. Paths                       400 SY @ $5/SY                     $2,000
              Wood Timber Climber                    I @ $2000 EA                       $2,000
              Repair &amp; Reset                                                            $1,500
                (Existing Equipment)
              Sand                                                                      $1,000
              Planting                                                                  $ 700
                                                                                        $9,825

                                                           3
<pb n="6" />

              NEW GRAVEL PARKING (32 CARS)_

              Excavate 12"                        500 CY @ $2/CY                   $1,000
              Demolish Conc. Slab                                                  $2,000
              3/4" Gravel 12"                     500 CY (a $7/CY                  $3,500
              Planting                                                             $1,000
              RIP-RAP (SHORELINE PROTECTION)                                       $7,500

              Borrow                              900 CY @ $6/CY                   $5,400
              Rip-Rap                             300 CY @ $20/CY                  $6,000
                                                                                  $11,400

              WATER VIEW AREA

              Wood Guardrail                      300 LF @ 8.50/LF                 $2,550
              Wood Benches                        3 @ $500 ea                      $1,500
              New Parking                                                          $1,000
              Planting                                                             $2,000
                                                                                   $7,000

              NEW WOOD SHELTERS                   2 @ $7,000 ea                   $14,000

              SOFTBALL INFIELD

              Remove 6" Base Path &amp; Pitcher Mound                                  $1,000
              Mix in 50% Stonedust &amp; 50% Washed Sand                               $1,000
              Replace &amp; Compact to a Density of 90%                                $1,000
              Define Edge &amp; Reseed                                                 $ 500
              New Bases                                                            $ 750
              Team Benches                                                         $ 800
              Paint Backstop (Black)                                               $ 500
              PICNIC AREA PARKING                                                  $5,500

              Remove Steel Rail                                                    $ 200
              Wood Guardrail                      70 LF @ $8.50/LF                 $ 600
              Remove &amp; Reset Utility Pole                                          $1,500
              Excavate 12" Gravel                 75 CY @ $5/CY                    $ 375
              3/4" Gravel 12"                     75 CY (a $R/CY                   $ 600
              Planting                                                             $1,000
                                                                                   $4,300
              SUBTOTAL                                                            $128,800
              ENGINEERING &amp; CONSTRUCTION CONTINGENCIES                           $ 32,000
              TOTAL                                                               $161,000

                                                        4
<pb n="7" />

                                  RECREATION HALL AND RESTROOM FACILITY
                                               ARCHTTECTURAL

             EXISTING CONDITIONS

             INTRODUCTION

             The New Castle Recreation Hall, at the Great Island Commons was built
             originally as a mess hall for Camp Langdon.           It is currently used for
             organized indoor sports, the annual town meeting, and as a rental hall for
             private parties.   Rental use has been curtailed lately because of inadequate
             restroom facilities, deficient electrical system, and its general state of
             disrepair.  Films and theatrical productions have also been held here in the
             past. Practically uninsulated, the facility is little used in cold weather.

             STRUCTURE

             The hall I,, in good condition structurally as reported in the detailed
             structural analysis performed by Collopy Engineering Consultants dated
             September 11, 1984, and included herein. There are no signs of rot or decay
             In the foundation/floor structure or roof structure based on limited access
             visual inspection.   The report recommends that work on the building foundation
             be concerned with insulation techniques only, as the structure is sound.

             EXTERIOR

             The building exterior is weathertIght, but approaching the end of its
             functional life,    The double hung windows are fitted with unsightly storm
             windows and the doors appear in poor condition. The rather ugly asphalt or
             asbestos siding with 1111 to the weather and the deteriorated asphalt rolled
             roofing skirt are primary contributers to the building's overall character
             which is a plain, run down, utilitarian shelter.

             INTERIOR

             Interior finishes at the ceiling, walls, and floors, are all in physical or
             visual disrepair.    Except for 3 - 5" of blown in insulation in the ceiling,
             the building is uninsulated.        The windows appear Inoperable because of
             interior protective screening from gym activity.       The lighting, electrical,
             and heating systems are inadequate.

             PROPOSED PROGRAM

             The Town of New Castle desires to upgrade the Recreation Hall, enhancing this
             unique town resource, and providing an income source to defray maintenance
             expenses.  The Facility should accommodate the following potential uses:

                                       Organized Interior Sports
                                       Town Meeting
                                       Concerts
                                       Films
                                       Rental Hall
                                       Food Preparation
                                       Dances
                                       Drama
                                       Exhibitions
<pb n="8" />

            BUILDING CODES

            Applicable Codes, Town of New Castle:

                  National Building Code
                  1967 Edition, Abbreviated

                  State of New Hampshire
                  Barrier Free Design Code

            Recommended Codes:

                  BOCA - Basic Building Code
                  BOCA - Mechanical Code
                  BOCA - Plumbing Code
                  National Electrical Code
                  NFPA - Life Safety Code

            CODE  CONCERNS

            Occupancy Classification
                  NBC  - Assembly
                  BOCA - A3 - Assembly

            Occupancy  Load
                  BOCA - 236 Persons

            Required Toilet Fixtures

                  NBC - "There shall be a sufficient number of suitable and convenient
                          water closets properly connected with the drainage system".

                  BOCA - Occupancy load from 200 - 500 persons (236)
                         6 sanitary fixtures (water closet or urinal) per sex.

            Fire  egress requirements are adequately met with the three double door exits.

            Required Floor Loading Capacity

                  Assembly Areas         100 lbs/sf
                  (with movable seating)

                  Stage Floors           150 lbs/sf

            Existing Floor Loading Capacity

                  All Floors             80 lbs/sf

            Entrance and toilet facilities must be made accessible to the physically
            handicapped.
<pb n="9" />

             Additional requirements would have to be met to once again use the room over
             the entry vestibule as a projection room.

             REHABILITATION RECOMMENDATIONS

             WEATHERIZING/WINTERIZING

             Ceiling - Add 6" vapor barrier enclosed fiberglass batt insulation.
             Walls - Add 3 1/2" vapor barrier enclosed fiberglass batt insulation.
             Floor - Add 3 1/2" vapor barrier enclosed fiberglass batt insulation.

             Caulk, seal, weatherstrip, and refinish doors and windows to minimize air
             infiltration. Provide new panic/escape hardware at doors.

             Replace existing asphalt shingles with new architectural grade fiberglass
             shingles.

             Provide a continuous vent along the eaves to increase attic ventilation.

             Add a second set of double doors and one single door with new wood doors in
             metal frames.

             STRUCTURE

             Refer to collopy engineering consultants analysis for roof truss reinforcement
             recommendations.

             INTERIOR FINISHES

             Add a new painted gypsum wallboard ceiling providing a smooth surface between
             bottom chords of trusses with recessed lighting and heating system diffusers.

             Replace interior wall paneling and trim to allow wall insulation and improve
             aesthetics.

             Refinish and restripe wood floors.

             Provide new wood trim and paint exposed roof truss members.

             Use color to revive and unify the interior.
             Consider alternatives to interior window screens for aesthetics and window
             operation.  Suggest either more attractive wire screens or lexan plastic inner
             panel to preserve view.

             Acoustical treatment, particularly of the ceiling area, will be necessary if
             drama and music productions are important program elements.

             ALTERATIONS, ADDITIONS, AND DESIGN CONSIDERATIONS

             Provide adequate toilet facilities accessible to the handicapped, by
             reclaiming the existing toilet, kitchen, and mechanical spaces at the east end
             of the building.    The existing kitcben/toilet area at the Northeast corner
             will accommodate a women's toilet room with three water closets.       The existing

                                                      7
<pb n="10" />

             mechanical space at the South East corner will accommodate a men       8 toilet room
             with one watercloset and one urinal, as well a 9 the new mechanical room.
             This is the minimum amount of toilet facilities which can be accommodated
             within these spaces without taking space from the gym or adding on to the
             building.  While short of the required six sanitary fixtures per sex required
             by the BOCA Code, it is a significant improvement over the existing situation,
             and allowable under the governing National Building Code, subject to New
             Castle building official's interpretation of "sufficient number of suitable
             and convenient water closets".

             Provide entry ramp to make main entrance accessible to the handicapped.

             Provide a more pleasing main entry stoop and portico.         New entry stairs and
             shelter at other exits.

             Repair exterior siding with clapboards or cedar shakes including new window
             and door trim.     The change in scale of the new siding will improve the
             building's character considerably.

             Use color to accent the exterior.

             Replace foundation enclosure with treated wood and a lattice work treatment.

             Repair and repaint roof ventilators.

             Consider replacing the windows with new thermally efficient windows which do
             not require storm windows.

             Consider accentuating the current exposed rafter/eave detail with the addition
             of decorative, curved brackets along with the new siding and a lattice
             treatment of the foundation skirt to create a summerhouse, park aesthetic.

             Consider a kitcben/storage addition located along the south or north side of
             the building to accommodate food preparation and storage of tables and chairs.
             The current kitchen is Inadequate and the space will be used to improve
             restrooms.    Tables and chairs are currently stored inconveniently on the
             stage.

             If serious stage productions are to be accommodated, consider a stage addition
             at the west end containing dressing rooms, toilet facilities, and storage
             area, allowing enlargement of the stage into the previous dressing room areas.
             An extensive lighting and PA system should also be considered.

             FURNISHINGS AND EQUIPMENT

                   2 Basketball Back Boards
                   Tables and Chairs
                   Kitchen Equipment
                   Public Address System
                   Theatrical Lighting

                                                       A
<pb n="11" />

                      SOUTHEAST PERSPECTIVE
<pb n="12" />

                                       ARCHITECTURAL COST ESTIMATE

                ITEM                             QUANTITY         UNIT PRICE        RECOMMEND+

             WEATHERIZING-WINTERIZING
             6" Ceiling Insulation                 3700 SF             .56              2,075
             3 1/2 Wall Insulation                 3500 SF             .39              1,350
             3 1/2" Floor Insulation               3700 SF             .39              1,450
             Windows
                Caulk &amp; Seal                       375  LF             .95                356
                 Weatherstrip                       26  EA              35                900
             Replace Doors                            4 EA                              4,500
             Replace Roof Shingles                  40  SF             110              4,400
             Continuous Eave Vent                                                       1,000
             Vestibule Doors                                                            1,000
                                                                        TOTAL           12,700

             STRUCTURE
             Reinforce Trusses                      7   EA             215              11500
                                                                        TOTAL           1,500
             INTERIOR FINISHES
             New Ceiling                           2900 SF            2.25              6,500
             Replace Wall Paneling                 2300 SF            4.00              9,200
             Refinish Floor                        3700 SF             .50              1,850
             Restripe                              2740 SF             .50              1,850
             Truss Trim                               7 EA             350              2,500
             Window Screens                         26  EA              25                650
             Acoustical Treatment                  2400 SF            1.20              2,880
             Painting                              2000 SF             .40                800
                                                                        TOTAL           2Z,000
             ALTERATIONS, ADDITIONS
             AND DESIGN CONSIDERATIONS
             Restrooms
                  Framing                           30  LF              50              1,500
                  Ceramic  Tile Floor              360  SF            6.00              2,160
                  Drywall                          400  SF             1.50               600
                  Toilet Partitions                   4 EA             250              1,000
                     Accessories                                                          800
                     Painting                      400  SF             .50                200
                     Doors                            2 EA             250                500
                     Interior Trim                                                        200
             Entrance Ramp                                                              4,000
             Exterior Siding                       4000 SF             2.25             9,000
             Exterior Paint/Stain                  4000 SF              .50             2,000
             Foundatlon,Enclosure/lattice          800  SF                              2,400
             New Eave and Gable Details                                                 4,000
             Kitchen Storage Addition              480  SF                40            19,200

             SUBTOTAL                                                                  $47,600
             TOTAL                                                                     $87,800
             ENGINEERING &amp; CONSTRUCTION CONTINGENCIES 25%                              $21,950
                                                            TOTAL                    $109,700

             (Optional Window Replacement          480 SF                 40         $10,920)

             SPACE ADDED TO TOILET PAVILION        100 SF                 30 SF      $ 3,000

                                                            TOTAL                    $ 3,000

                                                      10
<pb n="13" />

                                 RECREATION HALL AND RESTROOM FACILITY
                                       MECHANICAL AND ELECTRICAL
             Plumbing

             STATEMENT OF CONDITION

             The main building has one working water closet, a lavoratory,      and a  ir  itchen
             sink. An upstairs toilet room is out of use and the room has been boarded up.
             There is evidence of an overflow, or a water line breakage at some time, which
             has damaged the kitchen ceiling below.

             Plumbing fixtures in dressing rooms behind the stage have been removed, though
             waste and vent piping still remains.

             A 1 1/2" water supply main feeds the building and is routinely shut off at an
             underground curb cock for the winter season to prevent freezeups.

             The building is used infrequently during winter, the heating system is shut
             down most of the time and all plumbing is either drained, or filled with an
             anti-freeze solution to protect against breakage.

             The existing plumbing equipment is old and inadequate for other than custodial
             occupancy.

             The existing bath house plumbing fixtures are In fair condition.       Due to the
             increase In number of persons using this facility, the present number of water
             closets and lavatories are inadequate.

             PLUMBING RECOMMENDATIONS

             It is recommended that In the main building toilet facilities be provided for
             both male and female use, including facilities for the physically handicapped,
             based on the maximum occupancy capacity of the building.

             An occupancy of 236 persons would require for females:        6 water closets, 3
             lavatories and a floor drain; for males: 3 water closets, 3 urinals, 3
             lavatories, and a floor drain.   See recommendations on Page 8.

             A drinking fountain designed to accommodate the physically handicapped should
             be provided.

             It is recommended that an additional drinking fountain with an adjacent
             cuspidor unit be provided for sports use.

             It is recommended that small electric water heaters with extra heavy
             insulation be provided for public toilets.

             It is recommended that if any showers are to be included, that the multiple
             shower bead "column" type arrangement be considered for maximum utilization of
             space.

             It is recommended that all plumbing fixtures be fitted with water saving flow
             restrIctors, and self-closing faucet handles.
<pb n="14" />

            It is recommended that for the comfort station, 2 additional water closets for
            females and 2 urinals be provided for males. Two floor drains will also be
            required.

            We also recommend that 2 showers be provided and a drinking fountain suitable
            for use by the physically handicapped.

            HEATING &amp; VENTILATION

            STATEMENT OF CONDITION

            The main building has an old oil-fired hot air furnace and blower which
            circulates through a ductwork system to ceiling registers.

            A space thermostat and timer controls the heating unit to allow for conser-
            vation of fuel.

            This heating system is partly uninsulated, and due to its age and poor con-
            dition, is bound to be inefficient.

            The forced air blower has an outdoor air intake concentration, fitted with a
            manual damper set in a position which may be allowing an inordinate amount of
            outside air with respect to the varying occupancy.

            The hot-air furnace and blower unit are in disrepair and are of such age an
            inefficient design that they should be replaced with efficient and modern
            units.

            The existing chimney appears to be in satisfactory condition as does the
            above-ground oil storage tank.

            HEATING AND VENTILATION RECOMMENDATIONS

            It is recom .. ended that the existing hot air furnace and blower unit be removed
            and scrapped.

            It is recommended that all existing ductwork be provided with additional glass
            fiber insulation and fire retardant jacket, sealed tight with staples and duct
            tape.

            A new oil-fired furnace unit should be installed, and the outside air intake
            duct be fitted with a low-leakage design motorized damper section, to be
            controlled so as to be regulated from an adjustable setting knob mounted near
            the space thermostat.

            The space thermostat should be replaced with a modern unit incorporating a
            timer and clock which can be programmed for automatic night setback.          Fire
            dampers shall be provided at all penetrations of rated walls.

            All toilet room spaces without windows should be provided with mechanical
            ventilation and controlled through spring-return timer switches to provide a
            maximum operational cycle of 5 minutes.

                                                   12
<pb n="15" />

            An exhaust system should be provided for the main ball space, with 2-speed
            drive motor.

            ELECTRICAL

            STATEMENT OF CONDITION

            The main building is fed with a 120/220 volt, single phase, 60 hertz, 100
            ampere service, through a meter on the front of the building.

            The existing panel boards are very old, and the wiring is a mixture of non-
            metallic sheathed cable and metal sheathed cable.

            The main ball lighting fixtures are for incandescent lamps; which are too low
            in efficiency to be in use at this time.

            The stage lighting fixtures are bare lamp incandescents.

            The condition of the building wiring panelboards, lighting fixtures, and
            wiring services in such that all should be considered too frail to endure any
            renovation.

            ELECTRICAL RECOMMENDATIONS

            It is recommended that the building wiring be removed where possible, or
            disconnected and abandoned completely.

            It is recommended that for the main ball, new metal balide lighting fixtures
            fitted with auxiliary quartz lamps on dimmer controls be provided to provide
            up to 30 foot candles lighting intensity at 2.5 feet above floor level.

            It is recommended that other than the stage, all other building spaces be
            provided with vandal resistant fluorescent fixtures.

            Stage lighting should be selected to satisfy the minimum requirements for
            dimming, and row selection to meet the Town's needs.

            All electrical work shall comply with the National Electric Code, and the Town
            Wiring Inspector's requirements.

            It is recommended that all new wiring be run in metal wireways, or be of the
            metal-sheatbed cable type.

            It is recommended that a new main service of 200 ampere size be provided,

            It is recommended that the building be provided with an automatic fire alarm
            system consisting of smoke detectors of the photo-electric type heat detectors
            of the combination fixed temperature and rate-of-rise type, ductwork smoke
            detectors, manual pull stations at egress points, and alarm born and light
            units.

            It is recommended that the building fire alarm system be a Class A type, with
            fully supervised circuits, run in metal tubing throughout.

                                                  13
<pb n="16" />

           It 16 recommended that the building fire alarm system either be connected to
           the municipal fire alarm circuits throngb a compatible transmitter unit and
           Master Box, or an automatic telephone dialer unit be provided to alert
           designated Town personnel.

                                               14
<pb n="17" />

                           NEW CASTLE REC. BLDG. HEAT LOSS EST. 12/13/84      RHM

             RECOMMENDED RENOV.   680 INDOOR, - 5OF OUTDOORS

                  Class:     24 x 12 FT 2 x .50 x 73' AT =      10,512  BTUH
                  Doors:      2 x 35 FT 2 x .46 x 730 AT =        2,351 BTUH
                              1 x 35 FT 2 x .46 x 63* AT =        1,014 BTUH
                  Walls:     2823 FT 2x .08 x 730 AT  =         16,486  BTUH
                  Ceiling:   3528 FT 2x .04 x 730 AT  =         10,302  BTUH
                  Floor:     3528 FT 2x .10 x 730 AT  -         35,754  BTUH

             Ventilation:   230 Occupants @ 5 CFM               1150 CFM
             (Say) 1200 CFM x 1.08 x 850 AT                   110,160 BTUH

                                                              176,579
                                                              x 1.25

                               Max. Furnace Output:           220,724  BTUH

                                                                    .7 EFF.

                               315,320 BTUH = 2.3 Gal/Hr Burner
                               No 2 oil: 138,000 BTU/GAL

             MINOR RENOV. - FLOOR INSUL. ONLY

             Walls: 2823 FT  2 x .33 x 730 AT           68,007  BTUH
                                                        16$486
                                     Add. Loss:         31,520  BTUH

             Ceiling: 3528 FT  2 x .08 x 73* AT =       20,837  BTUH
                                                      - 10002
                                                        10,000  BTUH
                           Extra Heat Loss Rate =       61,520  BTUH

             E    61,520 x 7400 x 24 x .62 = 1670    Cal/Season
                  73 x .065 x 138,000          More Oil Consp.

                                                      15
<pb n="18" />

                                     NEW CASTLE RECREATION BUILDING

             PLUMBING COST ESTI14ATE
             (Excluding a Kitchen Installation)

             3Water Closets @          $526.00              $1578.00
             2Urinals @                $587.00              $1174.00
             2Lavatories @             $430.00              $ 860.00
             2Floor Drains  @          $240.00              $ 480.00
             2Drinking Fountains @     $476.00              $ 952.00
             1Cuspidor Unit @          $400.00              $ 400.00
             2Elec. HW Heaters @       $167.00              $ 334.00
                                                            $5,778.00
                                          $1.64/SF          3,528.00 FT'

                  CARRY   $7,000

             HEATING &amp; VENTILATION COST ESTIMATE
             (Excluding a Kitchen Installation)

             Removals                                       $ 480.00
             New Furnace Unit                               $1235.00
             New Ductwork                                   $ 800.00
             Temperature Controls                           $ 600.00
             Additional Duct Installation                   $1200.00
             Staging                                        $ 300.00
             Flue Piping                                    $ 160.00
             Fuel Oil Piping                                $ 100.00
             Service Contract                               $ 300.00
             Exhaust Fans                                   $2120.00

                                                            $7295.00
                                                               3,528 FT'
                                          $2.06/SF

                  CARRY $9,000

             ELECTRICAL COST ESTIMATE
             (Excluding Special Stage Lighting)

             3528 FT 2 @$4.54/FT 2 = $16,000

             TOTAL MECHANICAL AND ELECTRICAL:               $32,000
             ENGINEERING &amp; CONSTRUCTION
              CONTINGENCIES 25%                              -6,000

                                            TOTAL           $40,000

                                                    16
<pb n="19" />

             COMFORT STATION

             PLUMBING
             (Excluding Slab Excavation)

             2Water Closets @          $526.00              $1052.00
             2Urinals @                $587.00              $1174.00
             0Lavatories
             1Drinking Fountain
              (for Physically
              Handicapped) @           $476.00             $ 476.00
             2Showers @                $540.00             $1080.00
             2Floor Drains             $240.00             $ 480.00
                                                           $4262.00
                CARRY $4500                 CARRY          $4,500.00

             ENGINEERING &amp; CONSTRUCTION
              CONTINGENCIES 25%                            $1,125.00

                                            TOTAL          $5,625.00

             (WITHOUT SHOWERS AND DRINKING  FOUNTAIN
              CARRY    $3,000.00)

                                                    17
<pb n="20" />

                                         COST ESTIMATE SUMMARY

            SITE MASTERPLAN

            Park Entrance                                        $13,100
            Tennis Courts &amp; Gravel Parking                       $38,000
            Ice Skating Rink                                     $18,500
            Playground                                           $ 9,825
            New Gravel Parking (32 Cars)                         $ 7,444
            Rip-Rap (Shoreline Protection)                       $11,400
            Water View Area                                      $ 7,000
            New Wood Shelters                                    $14,000
            Softball Infield                                     $ 5,500
            Picnic Area Parking                                  $ 4,300

            SUBTOTAL                                            $129,000
            ENGINEERING &amp; CONSTRUCTION CONTINGENCIES 25%        $161,500     TOTAL

            RECREATION HALL

            Weatherizing/Winterizing                             $12,700
            Structure                                            $ 1,500
            Interior Finishes                                    $26,000
            Alterations, Additions                               $47,600
            Electrical and Mechanical                            $32,000

            SUBTOTAL                                            $119,800
            ENGINEERING &amp; CONSTRUCTION CONTINGENCIES 25%        $ 30$000
            TOTAL                                               $149,800

            NEW BUILDING            4200 SF @ 60/SF             $252,000     TOTAL

            RESTROOM FACILITY

            Architectural                                        $ 3,000
            Mechanical &amp; Electrical                              $ 4,500

            SUBTOTAL                                             $7,500
            ENGINEERING &amp; CONSTRUCTION CONTINGENCIES 25%         $1,875
            TOTAL                                                $9,375