		<mainTitle nfc="0"><title>Problems in planning and constructing transmission lines which interconnect utilities, Federal Power Commission</title>/<respStmt>United States General Accounting Office.</respStmt></mainTitle>
	</titleStmt>
	<authorStmt>
		<corpAuthor mainEntry="y"><name type="jurisdiction">United States.</name><subName>General Accounting Office.</subName></corpAuthor>
	</authorStmt>
	<imprint><pubPlace>Washington, D.C.</pubPlace>:<pubName>The Office</pubName>,<pubDate>1977.</pubDate></imprint>
	<classStmt>
		<locClass>
			<subject cat="corp">United States.</subject>
			<subject cat="sub">Federal Power Commission.</subject>
		</locClass>
		<locClass>
			<subject cat="top">Electric power systems</subject>
			<subject cat="geo">United States</subject>
			<subject cat="gen">Design and construction.</subject>
		</locClass>
		<locClass>
			<subject cat="top">Interconnected electric utility systems</subject>
			<subject cat="gen">Design and construction.</subject>
		</locClass>
	</classStmt>
</metadata>

<text xml:space="preserve">
<pb n="1" />

                                                 MAY 2,1977
                                                UNITED STATES
                                                GENERAL ACCOUNTING OFFICE

                                                Problems In Planning And
                                                Constructing Transmission Lines
                                                Which Interconnect Utliies

                                                Federal Power Commission
                                                Acoroing to Federal and indendent power               COASTAL ZONE
                                                Studies, future reliability and adequacy of the          INFORMATION CENTER
                                                electric power Supply depends on the timely
                                                installation of generating and transmitting
                                                facilities to meet our future needs.

                                                The Federal Power Commission should

                                                      --take the lead in promoting joint Fed-
                                                        erd industry studies to identity and
                                                        evaluate new interconnections and
                                                        changes in existing interconections;
                                                      --follow up on completed studies to re                        U.S.DEPARTMENt OF COMMERCE NOAA
                                                        solve objections which might frustrate
                                                        the adoption of study recommenda                             COASTAL SERVICES CENTER
                                                        tion.									   2234 SOUTH HOESION AVENUE
                                                                                                                                 SC 4405-2413
                                                        work with utlities to establish criteria
                                                        for interconnection Studies. which will
                                                        adequately consider national goals and
                                                        identify factors which may adversely
                                                        affect proposed interconnections. and

                                                      --work with utilities to make sure they
                                                        use the criteria in both industry and
                                                        Federal studies.
                             HD
                             9685               EMD-77-21                                                           JUNE 9,  1977
                             .U62
                             U554
                             1977
                                                                                   Property of csc Library
<pb n="2" />

                                        CZIC COLLECTION      15272

                             UNITED STATES GENERAL ACCOUNTING OFFICE
                                     WASHINGTON, D.C. 20548

          ENERGY AND MINERALS
              DIVISION

              B-180228

              The Honorable Richard L.Dunham
              Chairman, Federal Power Commission

              Dear Mr.  Dunham:
               This report  discusses  problems in planning  and  constructing
              transmission lines which interconnect utilities.     Our review
              was made to determine if needed interconnections    were being
              identified and if they were being constructed in    atimely
              manner.

                  This report contains recommendations to you    on page 29.
           As you know, section  236 of the Legislative Reorganization
              Act of 1970 requires   the head of a Federal agency to submit   a
              wri tten statement on  actions taken on our. recommendations to
              the House Committee on Government Operations and the Senate
              Committee on Governmental  Affairs not later than 60 days after
              the date of the report and to the House and Senate   Committees
              on Appropriations with the agency's first request for appro-
              priations made more than 60 days after the date of the report.

                   We, are sending copies of this report to the Director,
              office of management and Budget, and tothe Secretary of the
              Interior.

                                              Sincerely yours,

             COASTAL ZONE
                                              Monte Canfield, Jr.
         INFORMATION CENTER
                                              Director
<pb n="3" />

            UNITEr)   STATES                        PROBLEMS IN   PLANNING AND
            GENERAL    'ACCOUNTING OFFICE           CONSTRUCTING  TRANSMISSION LINES
                                                    WHICH INTERCONNECT    UTILITIES
                                                    Federal  Power  Commission

                       D  I GE S T
                       According  to  Federal a:-.d   Indepenjent  studies,
                                               adequacy of the national
                       the  reliability and
                       electric power supply depends on the         timely
                       in,stal Lat ion ofnew   gen.era.ting-and transmitting
                       facilities.
                       Electric utilities      have increasingly   interconnected
                       with, each other   to   permit the flow of electricity
                     .,among them.' Interconnections generally have
                       @technical and economic advantages for       utilities,
                       and                                            e Nation.
                            siirilar benefits for regions and th
                       individual utilities     may save money.throu,gh
                       interconnections by
                          --sharing  their electric power-generating
                            capacity  to cover an unexpected deficiency
                            in their  normal   power.supply,.

                          --purchasing    lower cost power,
                          --reducing or   delaying.additional generating
                            capacity, and
                          --selling excess power     that would not be
                            otherwise used.
                       Even,,when  an interconnection presents minimalor
                       no economic advantage to a utility, a region or
                                               fit by
                       the  Nation may bene
                          --the ability to transfer power to shortage
                            areas during national emergencies,

                          --the conservation of scarce resources,
                          --the reduction      of effects on the environment by
                            delaying additional generating capacity, and
                          -,-the con@,ideration of national defense, issues.

                                                                          EMD-77-21
               11@t    UPon rernoval. the r6port
              cove- date should be noted hereon.
<pb n="4" />

                       DO INTERCONNECTIONS
                       MEET POWER NEEDS-i

                       Yes--data from utilities, utility po.,er pools,
                       and national organizations shows that the
                       present interconnections of utilities were
                       sufficient at the time of our study to meet
                       power needs in emergencies.

                       Utilities have transferred power to meet
                       national or regional needs on a regular basis
                       as well as during emergencies. For example,
                       when the Tennessee valley Authority's Browns
                       Ferry nuclear plant was shut down due to a
                       fire, the Authority purchased adequate replace-
                       ment power from utilities which interconnected
                       with it.

                       However. a report prepared for the Energy
                       Research and Development Administration said
                       that reliable and efficient production of the
                       growing el-?ctric loads projected through the year
                       2000 would require higher capacity transmission
                       lines to interconnert utility systems. (See
                       pp. 4 and 5.)

                       ADEQUACY OF INTERCC-NNECTION
                       STUDILS

                       The Federal Power Ccqimission, responsible for
                       encouraging utilities to interconnect voluntarily,
                       studied interconnections and issued 35 reports
                       from 1969 to 1975. Power agencies within the
                       Department of the lnter4ir have a2so studied
                       interconnections. (See p. 6.)

                       Federal studies for the most part were

                         --based on costs and benefits for the
                           interconnecting utilities;

                         --aimed at systems  'in the Southwest and
                           concentrated on small iF3olated systems
                           rather than regional sl,:stems, which could
                           rel"Pult in larger benefits; and

                         --done W:."Lhout involving the affected utilities.
                           (See p. 6.)
<pb n="5" />

                       Need for expanded   Federal
                              ommissibn   role
                       Power C
                       recognizing national criteria

                       The national advantages of interconnections
                       should be considered when planning lines among
                       utiiiti.es.  The Federal Power Commission did.
                       not do t:iis wl-en evaluating interconnections;
                       instead it studied the economic benefits to
                       the utilities, particularly those      in the Sout!"j-
                       W@est. (Twenty-eig,ht of the 35 studiesmade.
                       were of the Southwest.)

                       Commission,followup action on its      studies is
                       limit ed to maintaining status listings.        14-,
                       does not determine why the.utilities have not
                       e
                       stablished interconnections rr further analyzed
                       I-!,.p proposed interconnections-

                       Fcpj: example, one st,idy, examined the benetits
                       of interconnection.and coordination of 93
                       separate electric generating systems in-Kansas
                       and weEtern and southern Missouri. The studv
                       estimated savings of $1.92 billion bet,,,,een
                     .1980-90 to the utilities. Whether there were
                       poSsible national benefits in addition to those
                       savings was not considered in the analysis.
                       The Commission's only action was to send copies
                       of the study in November 1975 to the utilities
                       involved. However, Commission staff we inter-
                       viewed felt that it could do more to promote
                       and encourage voluntary interconnection.if it.
                       had more resources. (See pp. 7 and 8.)

                       The Commission should establish national'criteria
                       to oe used when considering needed interconnections
                       because an interconnection could present no       ecq-
                       nomic advantage (or disadvantage) to a utility,
                       while providing advantages to a region or the
                       Nation. These criteria should be directed-at
                       conservation of scarce resources, reduced trans-
                       mission and generation, and reliable national
                       emergency services and national defense. Each
                       of these goals becomes    increasingly important as
                       the Nation's domestic energy supplies decrease.

                       According to the utilities contacted, unless an
                       interconnection shows economic benefits to one
                       or more of the interconnecting parties, a utility

             Tear SheI
<pb n="6" />

                                                  o inst all' an inter
                        will,not act on its.own t
                        connection.  Consideration of    national goals
                        should be an integral part   of the interconpection
                        planning process.   Establishing criteria   to
                    .:evaluate whether those goals ar-e met would:.be
                        afirst step  in making the   utilities aware    Of.
                        the Government's serious interest in     promoting
                        interconnections. If the criteria, once estab-
                        lished, are not used by utilities ih     their
                        decisionmakingr the ComwisPlion should move     to
                                                             pel their
                        seek legislative authority to com
                        consideration.
                        The-Energy Research  and Development Admindstration
                        is developing criteria,for the study     of electric
                        utility system expansion. This is a      good first
                        step which would help the Commission     establish.
                        nationallcriteria  and should help it    determine
                        the next steps in. improving its performance in.
                        this.area. .(See p. 13.)

                        Need for ioint
                        @_interconnection studies
                        The Commission and Interior independentlystudied
                        interconnections, usually without consulting the
                        utilities.   These studies were not well received
                        by the utilit-ies. and, as  a result, most recom,-
                                   have not'been    implemented.   (See p@ 14.)
                        The Commission. should encourage joint
                        Government-utility studies to systematically
                        W identify and study future regional       and inter-
                                                              follow up.on
                        regional interconnections and (2)
                        previous  studies to determine why    the utilities
                        have not  implemented them or further analyzed
                                             onnection.
                        the proposed interc
                        These studies  should recognize the    various,
                        purposes, needs, and objectives of     each
                        organization  irvolved, as well as nationaY
                        goals.   Differences. among organizations will
                        then be identified, discussed, and     ultima-.ely
                        resplved.    (See p. 28.)
                        Joint Federal-industry studies should determine
                        how all relevant factors (finarcial, environmental,
                        and institutional) affect inte.connection and
                        consider methods to develop alternative plans       for
                        providing the needed    services.   (See pp.',20 and  24.)
<pb n="7" />

                 FACTORS AFFECTING CC45TRUCTION
                 OF INTERCONNECTIONS

                 The utility industry must deal with financial,
                 environmental, and institutional considerations
                 which may delay or cancel proposed intercon-
                 neotions. These factors are complex, and some
                     outside the control of individual utilities
                 a,
                 ana at times, Lhe utility industry. As a result,
                 individual utilities and Government agencies may
                 not be able to deal with these factors in a way
                 to expedite the construction of transmission
                 facilities. (Sk:e p. 19.)

                 RECOMMENDATIONS TO THE CHAIRMAN,
                 FEDERAL POWER COMMISSI09-

                 Tne Chairman should

                   --take the lead in promoting, throughout the
                     Nation, joint Federal-industry studies-to
                     identify and evaluate new interconnections
                     ind changes in existing interconnections;

                   --follow up on completed int;-connection studies
                     to resolve objections to t'- studies which
                     might result in aaoption oz study recommen-
                     dations;

                   --work with utilities to establish criteria
                     for carrying out interconnection studies
                     which will require adequate consideration of
                     national goals and timely identification of
                     factors which may adversely affect the pro-
                     posed interconnection; and

                   --work with the utilities to make sure the
                     criteria are used; if they are not used
                     voluntarily within a reasonable time after
                     their release.. the Commission should consider
                     whether further steps should be taken to com-
                     pel their consideration and seek additional
                     legislation if necessary.

         TeAl Sh                       v
<pb n="8" />

                      AGENCY CO-jIENTS
                      The Depa. t-n,-,nt of the Inter i or (see app. II
                      stated ttat our report presents a comprehens0e
                      analysin and agrees that transmission and gen-
                      eration sh-oild be planned to consider the
                      advantages interconnections may offer for pur-
                      suing ridtional or regional energy conservation
                      programs, reduced transmission and generation
                      investment, emergency service, and national
                      defense.

                      The Federal Power Commission (see app. III)
                      said that there is little basis presented in
                      GAO's report to conclude that the Commission
                      has not effectively carried out its responsi-
                      bilities in promoting Linterconnections and that
                      the current network speaks for itself.

                      The Nationil Electric Reliability Council said
                      that the present system of interconnections is
                      a result of the eftorts and good judgment ot
                      highly qualified, dedicated engineers and exec-
                      utive-s who are intimately involved in these
                      matters.

                                           vi
<pb n="9" />

                                   C o n t e n t s

                                                                       Page

          DIGEST

          CHAPTER

                       INTRODUCTION
                            Scope of review                              3

              2        ADEQUACY OF INTERCONNECTIONS TO
                         MEET POWER NEEDS                                4

              3        ADEQUACY OF INTERCONNECTION STUDIES               6
                            Need for expanded consideration
                              of nat4onal criteria                       6
                            Need for joiat interconnection
                              studies                                   14
                            utility industry views of FPC
                              responsibility to promote
                              interconnections                          17

              4        FACTORS AFi'ECTING CONSTRUCTION OF
                         INTERCONNECTIONS                               19
                            Financial problems                          20
                            Environmental considerations                20
                            Institutional constraints                   24

              5        CONCLUSIONS, RECOMMENDATIONS, AND
                         ,jGENCY COMMENTS                               27
                            Conrlusions                                 27
                            Recommendations to the Chairman,
                              FPC                                       29
          APPENDIX          Agency comments and our evaluation          29

                       National Electric Reliability Council            31

             II        Letter dated November 29, 1976, from
                         AsSistant Secretary, Administration
                         and Manaqement, Department of the
                         Interior                                       32

            III        Letter dated November 3, 1976, from
                         Chairman, Federal Power Commission             37

              IV       Principal officials responsible for
                         administering activities discussed
                         in this report                                 39

   A
<pb n="10" />

                                        ABBREVIATIONS

               BPA         Bonneville Power Administration

               ERCOT       Electric Reliability Council or Texas

               ERDA       Energy Research and Development Administration

               FPC         Federdl Power Commission

               KV           kilo )It

               MAAC        Mid-Atlantic Area Council

               MARCA       Mid--Continent Area Reliability Coordination
                           Agreement
               NERC        National Electric Reliability Council

               PJM         Pennsylvania-New Jersey-Maryland Interconnection

               SEC         Security and           Commission

               SPP         Southwest Power Pool

               TWA            Tennessee Valley Authority

               WSCC            Western Systems Coordinating Council
<pb n="11" />

                                    CHAPTER I

                                   INTRODUCTION

               Electric utilities have increasingly interconnected I/
         their systems because they provide more reliable and economical
         service. The Federal Power Commission (FPC) said that the
         following are the three principal objectives in providing
         adequate transmission facilities for the purpose of inter-
         connecting utilities.

                1.  To support immediately any         area Suddenly
                    faced with a serious and unexpected deficiency
                    in its normal generating            The network
                    must have capacity to handle, well with , stable
                    limits, the automatic infavor of supporting power
                    from the hundreds of generators in the surrounding
                    intercornected network.

                2.  To transfer, without serious restrictions,
                    capcity and energy within rEgions and between
                    regions to meet powEr shortages. Emergencies can
                    arise from innumerable causes, such is delays in
                    commercial operation of new generation, problems
                    with new equipment, the failure of major qener-
                    ating units or other elements of the system, and
                    unexpected peak demands caused by weather extremes.

               "3.  To exchange power and energy on a regional and
                    interregional scale, and to achieve important
                    reductions in generating capacity investment and
                    in cost of energy production."

               Other benefits of interconnected operation may include:

               --Displacement of oil and natural gas with other types of
               _ generating fuels which are abundant (e.g., coal).
                Bulk energy transfers to take advantage of energy-cost
                differentials between the areas.

         I/ An interconnection is a transmission line permitting a flow
            of electricity between the facilities of two eletric systems.
            when the first transmission line is built between two systems,
            every additional line becomes part of a network because all
            transmission lines--intrasystem and intersystem--have an inter-
            acting role and become a part of an overall "system."
<pb n="12" />

                      --Diversity excha@tges made r-issible by diffe:ing load
                        characteristics due to se sonal patterns, -Ame zones,
                        and weather.

                      --Sharing of     ating reserve to take advan:age of
                        differen,     s of generation and to maxim@-ze
                        efficiency in unit commitment and scheduling.

                      --Improvement in system stability.

                      Even in instances where an interconnection m3y not present
                 an economic advantage to a utility, there may be Pivantages to
                 a region or the Nationj such as

                      --the ability to transfer power to shortage areas during
                        national emergencies,

                      --the conservation of scarce resources,

                      --the reduction of environmental impact by delaying or
                        reducing additional generating capacity, and

                      --national defense considerationq.

                      The present highly interconnected transmission network in
                 the United States has been developed by the electric utility
                 industry.  Facilities have been installed so chat the network
                 can (1) sustain a wide variety of disturbances due to forces
                 of natUre, equipment breakdowns, a wide variety of load con-
                 ditions and (2) provide a medium for inutual emergency support
                 to all systems.

                      The development of the network by the ir,du9try has provided
                 economies in operation and reductions ir investments by sharing
                 generating capacity, exchanging peakload assistance, transferring
                 power to conserve high-cost fuel or critical types of fuel, and
                 providing a raliable and adequate bulk power supply in the
                 United States through emergency assistance among systems.

                      With tne exception of Texas utilities 1/, most large
                 utilities are now interconnected across StaEe boundaries;
                 however, there is a continuing need to expand and improve power
                 facilities.  Through the years, improved transmission and gen-
                 eration technologies, growing loads, and system reliability
                 requirements further stimulated transmission line construction.

                 I/ See page 24 for a discussion of the reluctance of Teyas
                    utilities to interconnect with out-of-state utilities.

                                               2
<pb n="13" />

                  The utilities operating independently and qroup@.-, of
             utilities which form power pools plan and construct cransmission
             lines to interconnect utility systems and various utility
             associations' study interconnections. In addition, 2ederal
             agencies are involved in planning and constructing (Q.g.,
             Department of the Interior), a,nd promoting and eucouraging
             (e-g-, FPC) voluntary interconnections.

             SCOPE OF REVIEW

                  our objectives were to determine how FPC was carrying
             out its responsibilit., to promote and encourage volurtary
             interconnections, if needed interconnections were being iden-
             tified and studied, what problems utilities naa in constructing
             interconnections, and what the Federal interconnection role
             sh3uld be.

                  Our review was made primarily at (1) FPC's headquarters
             office in Washington, D.C., and its regional offices in
             Fort Worth, Texas; San Francisco, Caliiornia; and New York,
             New York; f2) the Department of the Interior in Washington,
             D,C,; (3)     Bureau of Reclamation's Lower and Upper Missouri,
             Upper Colora6o, and nid-Pa-ific regional offices; (4) Bonne-
             ville Po. r Administration (BPA) in Portland, Oregon;
             (5) Nati_,l Electric Reliability Council (NERC) in Princeton,
             New Jersey; (6) four NERC regional councils--Southwest Power
             Pool (SPP), Electric Reliability Council of Texas (ERCOT),
             Western Systems Coordinating Council (WSCC), and Mid-Atlantic
             Area Council kMAAC); and (7) numerouF public (non-Federal)
             and investor-owned utilities. We examined the pertinent
             documents, records, reportq.. and files relating to the above
             organizations' procedures --,r identifying, planning, and
             const,:ucting intcr:onnections.

                                           3
<pb n="14" />

                                           CHAPTER 2

                                  ADEQUACY OF INTERCONNECTIONS

                                      TO MEET POWER NEEDS

                       In our review, which included an analysis of data from
                 utilities, power pools, and national organizations, we found
                 that present interconnections of utilities were sufficient
                 ot the time, of our study to meet power needs in emergencies
                 However, Federal and independent studies of the reliability
                 and adequacy of the national power supply indicate that future
                 reliability and adequacy of the electric bulk power supply
                 depends on the timely installation of new generation and
                 transmission facilities to meet our future needs.

                       Also, several studies indicate that additional inter-
                 connections are economic but suggest further evaluation is
                 needed. Unfortunately, there is little or no consensus on
                 the validity of these studies. This matter is discussed in
                 chapter 3.

                       We noted instances where utilities have transterred
                 power to meet needs on a regular basis as well as during
                 emergencies. For example, the Tennessee Vallev Authority (TVA)
                 power load r--@quiraments are higher in winter than in other
                 seasons. According to TVA the seasonal variation in load
                 requirements is largely compensated through its interchange
                 agreement with otner electric utilities. TVA receiv,!@ power
                 from utilities primarily in the winter and provides power to
                 them primarily in the summer. Interchange agreements accounted
                 for about 8 percl--it of total kilowatt-hours of power passing
                 through TVA's system in fiscal year 1974.

                       The 1973 oil embargo necessitated the transfer of energy
                 to tne Middle Atlantic and Ncw EnglanJ States. A National
                 Association of Regulatory Utility Commissions report I/ said
                 that from December 1973 to May 1974, 800,000 megawatt-hours 2/
                 of energy had beer. transferred into this area. Also, when -
                 TVA's Browns Ferry nuclear plant was shut down due to a fire,
                 TVA was able to Durchase adequate energy from utilties with
                 which it inter cot,nected .

                 1/ 1974 Report of the Committee on Electric and Nuclear Energy.

                 2/ One megawatt equals one million watts.

                                                4
<pb n="15" />

                    The advantagps of iaterconnections are recogn zed by the
               utility industry and additional interconnections aj? being
               constructed. in addition, an increasing need exists to
               strengthen the existing transmission network and ccnstruct
               higher capacity tran:;mission lines. A National ElEctric
               Reliability Council I/ report made in July 1975, stated that
               the future reliabiliFy and a1equacy of the electric bulk power
               supply depends on the timely installation of new generation
               and transmission facilities to meet the projected electric
               loads and provide sufficient reserves for emergencies. NERC
               believes that, in view of recent delays and cancellations of
               planned facilities experienced by the power industry, the
               Nation's transmission system needs to be strengthened.

                    The report points out that

                    It* * * interconnections cannot replace a long-term
                    deficiency in installed generating capacity or * * *
                    fuel supply -, * *. However, correction of any existing
                    weakness in t-he transmission network will increase the
                    cperating flexibility and provide additional support
                    when forced outages (shutdown cf a generating plant
                    for emergency reasons] cause shortages oi generating
                    capacity."

               NERC in the report recommended that          electric systems
               should continue to investigate all possible options for
               augmenting generating capability, and ways in which emergency
               transfer capabilities can be increased

                    A report prepared for the Energy Research and Development
               Administration (ERDA) said that m,.ich higher capacity trans-
               mission and distribution lines must be constructed to reliably
               and efficiently serve the growing electric loads projected
               through 2000.

               I/ NERC 4s an organization formed by nine regional councils
                 representing the Nation's utilities to augment the reliability
                 and adequacy of bulk power supply in the electric utility
                 systems of Nort:i America.   NERC consists of nine regional
                 reliability councils (see app. I) whose memberships comprise
                 essentially all ot the elActric power systems in the United
                 states and some Canadian systems.

                                              5
<pb n="16" />

                                         CHAPTER 3

                            ADEQUACY OF INIERCONNECTION STUDIES

                     The Federal Power Commission has legislative responsibility
                to promot(, and encourage interconnections on a voluntary basis.
                In carrying out this responsibility, it studied and issued
                35 interconnection reports from 1969 to 1975. However, these
                studies for the most part were

                     --based on costs and benefits accruing to the inter-
                       connecting utilities without consideration of any
                       national criteria,

                     --aimed at systems in the Southwest and concentrated on
                       small isolated systems rather than regional areas which
                       could result in larger benefits, and

                     --made withouc involving the affected utilities, and
                       their results were not always accepted by them; also,
                       a followup on COMDleted studies by FPC to encourage
                       their acceptance was lacking.

                     Power agencies within the Department of the Interior and
                utilities h,@ve also performed interconnection studies, but
                their studies do not consider national criteria unless it
                benefits the participants. interior, in two of its three
                interconnection studies, considez-ed some naticnal goals; but
                the studies basically retlected the advantages to the utilities.

                     The national advantages of interconneet",)ns--power transfers
                during emergencies, conserving scarce resources, reduction of
                ervironmental impact by delayinq or reducing additional generating
                capacity, national defense--should be considered when planning
                lines between utilities. The National Electric Reliability
                Council and the Energy Research and Development Administration
                have emphasized the national importance of interconnections
                and their concern over tne adequacy of interconnections in the
                future.

                NEED FOR EXPANDED CONSIDERATION
                OF NATIONAL CRITERIA

                     FPC is the only agency with responsibility to promote and
                encourage voluntary interconnections. However, FPC has not
                (1) established national criteria for evaluating interconnections,
                (2) developed pro,@edures calling for its regional offices to

                                              6
<pb n="17" />

               rev;-,,w interconnections, (3) been involved in other studies
               performed by Interior and utilities, and (4) followed up on
               its cwn studies to determine why the utilities have not imple-
               mented them or further analyzed the proposed interconnection.

                    According to FPC, section 202 of the Federal Power Act
               (16 U.S.C. 791-825) directs FPC to :

                    11* * * promote and encourage the voluntary inter-
                    connection and coordination of electric utility
                    facilities for the purpose ot assuring an abundant
                    supply of electric energy throughout the nation
                    with the greatest possible economy and with regard
                    to the proper utilization and conservation 3f
                    natural resources."

               Under the act FPC can order interconnections only during
               emergencies or when a utility or State commission requests an
               interconnection with another utility (but only after FPC
               determines the interconnection is necessary or appropriate
               for the public interest).

               FPC studi-s

                    Through a preliminary analysis, FPC determines if the
               cost of power differs substantially between two or more
               utility systems or if other c4r-cumstances indicate the pos-
               sibility of savings through interconnectzd operations. This
               analysis is to estimate the monetary benefits of interconnected
               and coordinated operations. It the preliminary analysis shows
               a benefit of an interconnection, FPC will do a detailed study
               independently to determine if the interconnection is cost
               beneficial. Also, according to FPC staff, it performs inter-
               connection studies at the request of MemLers of Congress and
               utilities.

                    However, FPC has not established guidelines for its
               regional offices to systematically identify and st,.;-.-,, inter-
               connections nor has it established national criteria for
               evaluating interconnections. As a result FPC's efforts to
               promote and encourage voluntary intetconnections have been
               limited geographically and have only encouraged the involved
               utilities to interconnect when the corporate cost benefit
               ratio is favorable.

                    Our review of 28 of 35 FPC E'udies made bE een 1969 and
               1975 showed that FPC did not cons der national riteria or
               benefits. FPC interconnection stL.jies were concerned with
               the benefits to the utilities and iot the Nation.

                                               7
<pb n="18" />

                        FPC interconnect:on studies primarily focus    on small
                  isolated syszems. Dujing the period 1969-75 onl, two FPC
                  studies involved more than two utiliti   'es. The 21 studies we
                  reviewed involved small. isolated systems in the 'outhwest.
                  Followup action by FPC on its studies is limited to maintaining
                  status listings on a routine basis and not detern.ining why the
                  utilities have not implemented the studies or fuither analyzed
                  the proposed interconnection. The FPC staff, in commenting
                  on their role to promote and encourage voluntary intercon-
                  nections, said that they could do more i- meeting FPCIs
                  responsibility if given more -esources.

                        For example, FPC issued a report in November 1975 on the
                  benefits of inteiconnecting and coordinating the operations of
                  93 separate electric utility generation systems operating in
                  Kansas and western and southern Missouri. These systems
                  included 3 generation and transmission cooperatives, 54 inter-
                  connected municipal generating systems, 28 isolated municipal
                  systems, and 8 investor-owned electric utility systems.

                        The studv estimated savings to the utilities ot $1.92
                  billion between 1980 and 1990 trom full interconnection and
                  coordination of these 93 systems without considering possible
                  national benetits.

                        To realize these potential savings the utilities must

                        --establish a pooling agreement which allows the most
                          efficient operation ot the participating utilities'
                          combined resources,

                        --establish a central control over all operating systems,

                        --obtain financing authority from the State legislatures
                          in Kansas and Missouri to permit municipalities to
                          participate in jointly planned and constructed facil-
                          ities, and

                        --perform studies to determine transmission facilities
                          required for full coordination.

                        FPC believes it will be difficult to get the smaller
                  municipal systems to participate in a coordinated area-wide
                  system, because municipal systems in that area have traditionall
                  wanted to maintain total control over their systems. The only
                  action FPC took was to send copies of the November 1975 study
                  to the utilities; involved; no followup action has been taken
                  by FPC since then. However, FPC says it is monitoring these
                  systems.

                                                   8
<pb n="19" />

            Department of the Interior's activities

                 Since 1968, two of Interior's power agencies--Burciu of
            Reclamat on and Bonneville Power Administration--have @rformed
            three inzerconnection studies. Only two of these studies con-
            sidered some national goals--oil conservation and diversity in
            customer demand between Dower systems--but even these consid-
            erations were in terms of the economic advantages to the
            utilities. National benefits were considered incidental.

                 For example, a steering committee in interior publishpd a
            study in 1968, "Transmission 190," which found that electricity
            supply and demand data indicate that seasonal variations in
            demand and related supply requirements by 19BO will permit
            diversity exchanges I/ between the Pacitic Northwest and the
            central United States. This conclusion was recognized in the
            FPC National Power Survey of 1964. The study investigated
            12 different plans for making the interconnections, eauh of
            which showed positive benetit-to-ccst ratios ranging from 1.3:1
            to 1.9:1. The study stated that the proposed extra-high-voltage
            transmission interconnections would enable the interconnected
            utilities to look Deyond their area boundaries for economical
            sources of energy. In addition, these utilities could share
            in the output of larger and more economical generating units.

                 The steering committee recommended that a program of
            inter-regional planning and construction be initiated--by
            Federal and non-Federal utilities--to provide the power system
            benefits identified in the report. The report related the
            benefits to the utilities by showing that interconnections
            would enable them to look beyond their area for economical
            energy sources and did not discuss the advantages to the
            Nation from the interconnection,

                 On December 16, 1975, the Secretary of the Interior
            received autho@ization, through Public Law 94-156, to engage in
            feasibility studies of 12 potential water resource developments.
            Included was the authority to study the power interconnections
            for the purpose of improving electric power transmission systems
            affecting the 17 Western States.

            I/ Diversity exr-anges can be used when one regional area's
              high use period occurs at a different time from another.
              Thus, the two regions exchange power so that each can
              import electricity during high use periods and export it
              during low use periods.

                                          9
<pb n="20" />

               Interior's interconnection studies would (1) include
          consideration of potential power interconnections which would
          assist Federal, public, and investor-owned power suppliers to
          serve their custorier's load requirements at a lower cost and
          (2) result in conservation of resources. An Interior official
          said that Interior has not requested 'funds for the study in
          their fiscal year 1977 budget.

          Utilities' studies

               Utility officials said that identification of potential
          interconnections by individual utilitieb is generally initiated
          by a utility which projects a deficit or surplus of capacity
          or energy. The utility will try to identify and e-.-aluate
          potential generation facilities and/or interconnections which
          could be used to eliminate the deficit or transfer the surplus.

               Utilities we contacted said that eacli potential inter-
          connection is unique; therefore, each evaluation of ari inter-
          connection must be molded to reflect the suecific characteristics
          of that interconnection, such as size and type of generation,
          amount of capacity and energy to be transferred, and distance
          between the utilities to be interconnected.

               Utilities view interconnections as an advantageous method
          of meeting their capacity arid energy requirements as long as
          the surpluses available from another system are dependable or
          a diversity between their systems can be utilized.

               When evaluating interconnections, utilities cunsider the
          advantages to their systems; national and inter-regional needs
          and objectiNes do rot concern them.

               Some utility groups--known as power pools--have coordinated
          the planning and/or operation of their generation and trans-
          mi%,@@on facilities. This allows the members of the pool to
          acrieve greater economy and reliability. As of 1970 there
          wp-:e 22 formal power pools nationally which had 60 percent of
          the 4ation's generating capacity.

               One prerequisite to the achievement of coordinated opera-
          tions is adequate transmission interconnections between the
          member utilities. The following explanation tells how one of
          these power pools identifies and evaluates potential inter-
          connections.

                                        10
<pb n="21" />

                The Pennsylvania-New Jer;ey-Maryland
                Interconnection (PJM)

                PJM is a voluntarily organized power pool responsitle for
          the coordinated operation of the electric generation and trans-
          mission of bulk power for 11 investor-owned utilities. PJM
          operates a single system with central operational control over
          its members' generating and transmission facilities. This
          practice allows power to be freely transferred among members
          over interconnections so that electricity can be delivered to
          the ultimate customers as efficiently as possible. PJM is
          heavily interconnected--internally and exterrially--with 54
          interties among system members and 25 with utilities not in
          the pool.

                PJM uses two methods for identification and evaluation of
          potential interconnections. First, member companies develop
          plans for interconnertions needed to meet their own syster.'s
          requirements. Secona, the Planning and Engineering Committee
          of PJM periodically conducts long-range planning studies to
          identify the overall needs of the pool without regard to
          ownership of facilities.

                The Committee is responsible for coordinating the plans
          developed by member companies. The companies' planning is not
          superceded by the Committee; however, plans are reviewed for
          their effects on the reliability of the PRI system. This
          central review of proposed facilities is to make sure that
          the transmission facilities, including interconnections which
          are constructed, serve the best interests of the entire
          system.

                The Committee's periodic studies provide general guide-
          lines as to the preferred types, sizes, timing sequence, and
          general Iccation of future generation and oulk transmission
          capacity needed by PJM. These overview studies have played an
          important part in PJM's development because they ideptif% -- the
          need for facilities, including interconnections on a syctemized
          basis rather than on the needs of individual utilities. How-
          ever, according to Pim officials the final decision of what
          facilities are to be constructed remains with individual
          members.

                Specifically, PJM considers the following as the benefits
          it derives from an integrated operation:

                --Improved network reliability.

                 Greater operating efficiency.
<pb n="22" />

                   --Economies of scale.

                   --Better scheduling of additions.

                   --Flexibility in maintenance programs.

                   --Improved use of manpower and money.

                   --Lower cost to the customer.

             NERC  studies

                   NERC was formed voluntarily by the electric utility industry
             in 1968. -Its membership includes Government, investor-owned,
             and public utilities in the United States as well as Canadian
             utilities interconnected with systems in the United States.
             NERC is managed by a Board of Trustees, which includes repre-
             sentatives from each of nine regional councils and all segments
             of the electrical industry. Although not a member, FPC attends
             NERC meetings as an-official observer.

                   NERC's purpose is to augment' the reliability and adequacy
             of bulk power supply in the electric utility systems of North
             America, rather than to consider economic factors.     To achieve
             this goal, NERC proposeL, to

                          --encourage and assist the development of
                            inter-regional reliability arrangements
                            among Regional organizations or their
                            members;

                          --exchange information with respect to
                            planning and operating matters relating
                            to the reliability and adequacy of bulk
                            power supply;

                          --review periodically regional and inter-
                            regional activities on reliability and
                            adequacy;

                          --provide independent reviews of inter-
                            regional matters referred to it by a Regional
                            organization; and

                          --provide information, where appropriate, to
                            the Federal Power Commission and to other
                            Federal agencies with respect to mattcr!6
                            considered by the Council."

                                            12
<pb n="23" />

             NERC evaluates whether existing and planned transmission
         acilities are adequate to provide reliable service and to sup
        port generation-deficient areas during emergencies. According
        to NERC many lines are built because they are essential for
        maintaining the integrity of the network, and if this were not
        so, the existing network would not nave its present reliability
        and flexibility.

             NERC established a permanent subcommittee (Inter-regional
        Subcommittee) in 1970 to continuousiy review the overall
        adequacy and reliability of the Nation's bulk power system.
        NERC feels the coordination efforts by the regional reliability
        councils has assured tnat the ex0ansion of the netwoi,k is always
        such that new facilities are compatible and the network-can
        remain reliable. However, NERC does not consider national goals
        and objectives in its evaluations.

        Efforts to develop
        F@a_tiona I _&amp;r -iter i a -

             As previously stated in chapter 1, even in instances where
        an interconnection presents no economic advantages to a utility,
        there may be advantages to a region or the Nation. The only
        agency presently developing national criteria is ERDA.

             ERDA contracted three companies in 1975 to develop criteria
        for the study of electric utility system expansion. Part of the
        study is expected to be completed by mi6-1177. This process,
        which we believe has considerable value, is viewed by ERDA as
        an initial step in identifying all factors (quantitative and
        qualitative) which should be taken into account in identifying
        and evaluating potential interconnections.

             One of the ERDA contracts requires the contractor to:

               Identify paragieterc which are necessary and sufficient
             for conduct of studies of national issues relating to
             bulk power supply expansion, including, but not limited
             to parameters in the following areas:

             a.  National Resource objective and resource policy
             b.  Load growth (haracteristics
             c.  Economic trends or forces
             d.  Supply criteria and objectives
             e.  Fuel availability and costs
             f.  Regulatory policy, national and state
             g.  Electrical (system data)
             h.  Tecnnological factors (new equipment or process
                 optioT

                                      13
<pb n="24" />

             NEED FOR JOINT
             INTERUN-N-E-E-TION STUDIES

                   FPC and Interior have performed many of their inte--con-
             nection studies independently froin the affected utiliti..-s.
             All 28 FPC studies and 2 of the 3 Interior studies, included
             in c,@:- review, were done independent of utility input according
             to      -atilities we talked to. These studies were not well
             received by the utilities. As a result, 14 C?C studies and
             both Interior studies have not been implemen@@ed. In our
             review we noted that four studi?s were peLformed involving
             inter-regional interconnections (two FPC and two Interior),
             none of wtich have had che'ir recommendations implemented. The
             following two cases are examples of such inter-regional studies
             where joint involvement could have increased the opportunities
             for the acceptance of the study.

             FPC study

                  FPC published  a staff report on a proposed interconnection
             between the Electric RCliability Council of Texas and Southwest
             Power Pool I/ in October 1972 2/. Electric utility systems
             within ERCOT are isolated from-systems outside Texas. (See
             app. I.) The report concluded that interconnected and coordin-
             atel operation would result in a capacity savin7s of 2,080
             megawatts between 1975 and 1980. This capacity reduction would
             represent a savings of $193 million during the 5-year period.
             -rhe savings would result because of shared generating capacity
             between the two reliability councils and would not reduce the
             level of system reliability existing under isolated opera.-.ion.

                  FPC proposed three high-voltage interconnections to connect
             the two areas. They would provide an estimated inter-regional
             power transfer capability of abou*, 2,200-megavolt amperes be-
             tween ERCOT and SPP, and were estimated to have a cost of $37
             million, over the study period, resulting in an overall net
             savings of       million.

                  Although ERCOT operates a number of interconnections with
             the Commision Federal de Electricidad, in the Republic-of
             Mexico, no normally used interconnections connect ERCOT to

             1./ ERCOT and SPP are two of the nine NERC regional councils.

             2/ FPC ordered its st aff to update and amend as necessary its
                1972 study as a result ot a petition and application filed
                with it by the four corporation utilities (Docket No. E-9558,
                issued July 21, 197b).

                                            14
<pb n="25" />

        other councils in the United   States. Several executives ef
        the ERCOT utilities said ti,at interconnection with SPP wolld
        be a costly project which would produce few tangible economic
        benefits.

             Many of the ERCOT Members we interviewed did not addiess
        themselves directly to the methods or conclusions of the FPC
        study, but expressed the opinion that resetves could not be
        reduced below present levels without adv,-rse effects on system
        teliability. They also questioned the significance of FPC'S
        findings on reserve savings in light of the fact that utilities
        in Texas give first priority to construction of co&amp;l-fired
        and nuclear-gen-lrating capacity (not reserve capacity). They
        argue that with 3r without interconnections, ERCOT will prob-
        ably have a large reserve margin, since Pxisting j4.1 and
        natural gas ,eneration will remain i6le "nd can be used as
        reserves.

             In a-_'dition to questi.on;ng the validity of the economic
        benefits projected by FPC, ERCOT criticized the cost estimate
        of interconnection developed by FPC. FPC concludea that only
        three segments ot a high-voltage transmission line would be
        required to interconnect ERCOT and SPP. SevEral ERCOT rep-
        resentatives said that substantial funds would have to be
        spent nn internal strengtnening of Dotn the ERCOT and SPP
        transmission system to permit stable operatiGn. They added
        that the cost ot this internal strengthening was not consid-
        ered in PPC's study and, consequently, the cost of intercon-
        necting ERCOT and SPP was consideraoly understated.

             A number of ERCOT executives also said that ERCOT's
        pattern of isolated operation produces intangible benefits
        in the areas of planning and operation.     For example, ERCOT
        is a group of manageaule size utilities; theretore, planning
        conflicts can be resolved and responses to operating con-
        tingencies can be developed quickly by personal contacts
        between utility personnel. They said that if ERCOT is inter-
        connected to othef regions, problem solving will requirc more
        meetings, effort, and time.

             operating solely in intrastate commerce is a qLialifi(-ation
        for -.@-.embership in ERCOT, and its chairman told us that ERCOT
        utilities believe isolated operation best meets their goal of
        providing economical, reliable electric service. Texas utility
        executives expect tc face a number of regulatory problems if
        they interoonnect in@erstate and are subjected to FPC juris-
        diction.

                                       15
<pb n="26" />

                       Although we did aot attempt  to determine t1? validity
                  of FPCIP or ERCOT's contentions,  the Central ane Southwest
                  Corporation, which ha3 subsidiary utilities in EZCOT's and
                  SPP's regions, evaluazed the benefits from interonnecting
                  its four subsidiaries. The study points out tha,_ long-run
                  economic benefits of $38.7 million are available by inter-
                  connecting the Corporation's subsidiaries. The study indi-
                  cated that an additional potential savings of $227 million
                  is available if full, coordinated use can be made of the
                  trdnsmission systems in Texas. (A further discussion of the
                  Corporation's study is contained in chapter 4.)

                       Although ERCOT is isolated from its neighbors, ERCOT
                  officials said that joint studies would have the advantages
                  of obt3ining input from all parties and, therefore, would have
                  a bettt-r chance of being accepted. The participants would
                  identify and understand areas of disagreements--not necessarily
                  eliminate disagreements. Such a joint effort, which would in-
                  clude ERCOT, should (1) reduce questions concerning the validity
                  of projected economic benefits and cost estimates and (2) resialt
                  in the study's acceptance.
                  Department of the Inter'i8r's study

                       The Bureau of Reclamation published an interconnection
                  study in March 1975 which idantified a potential for cost
                  savings and reduction in oil and gas consumption. The inter-
                  connection considered was between the companies in the Mid-
                  Continent Area Reliability Coordination Agreement (MARCA) and
                  in the Western Systems Coordinating Council 1/.

                       The study was based on data publ4shed by MARCA and WSCC.
                  The study projected that entities in :he KARCA area may be
                  capable cf generating enough excess energy during light load
                  periods to displace the consumption of 23.9 million barrels of
                  oil at an estimated cost of $245.3 million by 1983 when the line
                  could be operational. The $245.3 million represents about one-
                  sixth of the amount required to consturct the two 1,900-mile,
                  765 kilovolt (kV) alternating current lines. The study con-
                  cluded that a more comprehensive interconnection study should
                  be undertaken to determine how these two systems might be
                  interconnected to achieve these savings.

                  I/ MARCA and WS;_'C are two of the NERC regional councils. See
                     appendix I for map indicating the areas covered by MARCA
                     and WSCC.

                                               16
<pb n="27" />

                      In March 1975 WS--'-C officials told us that t@-,ey were not
                 aware that such a potential had Deen identified.    Some utility
                 officials believed that it would riot be Leliable for customers,
                 to be supplied with electricity generated 1..900 r,iles away
                 because of the possibility tnaz tne lines could ro out of ser-
                 vice and leave customers witnout power. In Decerber 1975 the
                 Congress authorized the Secretary of ':he Interior to engage
                 in detailed feasibility studies of power intercortnection poten-
                 tial. These studies will include consideration of a MARCA-WSCC
                 interconnection.

                      As part of FPC's role of promoting and encouraging inter-
                 connections, it snould participate in interconnection studies.
                 NERC believes that studies can only be conducted by those who
                 are intimately knowledgeable of the present facilities, the
                 capabilities of the faC41itieS, the mode of operation, and the
                 lirriftations, that exist. If FPC had participated jointly with
                 interior, as well as witn WSCC and MARCA utilities, all parties
                 would have been aware of the potential benefits. As a result
                 of their awareness (and 3oint participation), their concern
                 for reliability may have been reduced and could have increased
                 the chances ot their accepting the study conclusions or in
                 the modification of the studv to account for any valid concerns
                 of the utilities.

                 UTILITY INDUSTRY VIEWS OF FPC
                 RESPONSIBILITY TO PROMOTE INTERCONt4ECTIONS

                     We met with executives of 48 electric utilities to discuss
                 FPC's responsibility to promote ana encourage interconnections.
                 These executives presentA widely diverse opinions on the need
                 for FPC involvement in identifying and evaluating intercon-
                 nections, and on the need for FPC to take a more aggressive
                 role in promoting interconnections through mcre studies. Mos,
                 felt that the transmission system generally has been meeting
                 ti..: zeds of the Nation.

                     The NERC president recognized the advantages of a joint
                 Federal and utility industry effort to study potential inter-
                 connections. Such a join. effort should address and help solve
                 the problems associated with construc Vg   I nterconnections.
                     Some executives of a private utility   favored FPC's efforts
                 in promoting interconnections. They viewed !@'K as a catalyst
                 for more anlaysis ef            interconnections. An official
                 of the Bonneville Power Administration believes that FPC could
                 provide the needed leadership to ensure that all beneficial
                 interconnections are identified and built.

                                              17
<pb n="28" />

                      Other private utility executives believed that FPC can
                not make any contributions to the utility industry by promoting
                and encouraging interconnections. Furthermore, utility exec-
                utives told us that constructing additional interconnections
                will not by themselves solve the energy, fuel, or capacity
                problem facing the utility industry.

                      Most _,tility executives do not believe that FPC personnel
                possess tii@ detailed knowledge of individual power systems
                neceqsar,., .. --ftectively ass-:@ss the specific costs and benefits
                of int;- rinections between such systems. For example, one of
                the criLAAASMS Of tne FPC report which identified benefits to
                interconnectirg ERCOT and SPP was the argument that it failed
                to recognize improvements to ERCOT's system whi-@:h would be
                required before interconnections could be made. Utility exec-
                utives ccntend that only engineers with a detailed knowledge
                of a given system would recognize such requirements.

                      Host of the utility executives we met with said that if
                FPC continues or expands its efforts in studying and promoting
                in@erconnections, it must be with the volunatry participation
                of t:@e utilities affected. Such cooperative efforts would
                allow those individuals most familiar with the system to actu-
                ally participate in the analysis. In their opinion these coop-
                erative efforts could also ensure nat study conclusions would
                be "objective and realistic" because they would have inpilt from
                the utilities directly involved as well as the Government. Also,
                because all parties concerned would have a part in performing
                th-2 studies, tnere would be a much higher probability that the
                recommendations would be implemented than if FPC were to do
                the studies independently.

                      In any future eftorts to work more closely with utilities
                in joint studies of interconnections, FPC should make every
                effort to maintain its independence and objectivity.

                                               18
<pb n="29" />

                                         CHAPTER 4

                                     FACIORS AFFECTING

                            CONSTRUCTION OF INTERCONNECTIONS

                   The utility industry must deal with financial, environ-
              mcntal, and institutional considerations which may result in
              delay or cancellation of proposed interconnections. These
              factors are often complex and outside the control of individual
              utilities and, in some situations, the utility.industry itself.

                   Delays and cancellaticns as a result of these factors may
              limit the efficiency-and effectiveness of the utility industries,
              efforts to provide customers with the most reliable and economic
              supply of electrical power. The effect of delays and cancella-
              tions of interconnections could reduce operating flexibility
              and transmission capability. Furthermore, in a number of areas,
              delays in transmission lines could make the netw-:)rk vulnerable
              to outages.

                   Successful completion of many planned transmission lines
              needed to interconnect systems is questionable because of
              various..factors.  The following schedule shows some uf the
              reasons cited by FPC I/ for transmission line delays.

                               Line Delays as of June 1975

                                                  Number of lines         Average
                   Reascn for  delay              delayed (note a)         delay

                                                                           (months)

              Fiscal problems                           22                 32.5

              Environmental considerations              38                 26.3

              Institutional (pEolonged pro-             32                 17.4
               cedures to obta.-*-n approval
               from Government agencies)

              a/ Some lines are delayed for more than one     reason.

              I/ Data is from FPC@s Transmission Line Construction Data for
                the month of June 1975.

                                             is
<pb n="30" />

                      Obstacles to the  construction of lines have already caused
                 man@ postponements. in June 1975 FPC reported that 184 (68
                 percent) out of the 271 transmission lines under ccnstruction
                 were delayed. These delays were the result of the previous
                 factors as well as others such as technological lintitations
                 and equipment delivery and installation problems. FPC reported
                 that the delays ranged from I month to 13 years, and z@veraged
                 15 months. These factors have also caused cancellations of
                 planned transmission lines.

                 FINANCIAL PROBLEMS

                      The electric power industry is one of the most capital-
                 intensive indUSILieS in tl,,e United 5tates, with financing
                 requirements representing about 15 to 20 pt-rcent of all U.S.
                 corporate financing. The utility industry's ability to provide
                 a supply of electLical power between J970 and 1976 had been
                 financially restricted in many cases by

                      --rapid increases in the rate of inflation, which
                        caused increased constructio@i, operating, and
                        maintenance costs,

                      --te6uction in the development of new technological,
                        cost-saving opportunities,

                      --increased public pressure to reducc. the number of
                        rate increases granted, and

                      --reduced investor confidence.

                      These cor.@,.tlons had a critical impact on many utility
                 companies. Accutding to FPC, the rapid expansion of the
                 utility industry's external financing requirements, combined
                 with rising interest rates, caused the deterioration of elec-
                 tric power company credit. Since 1970 the credit ratings of
                 secruities of approximately 70 major investor-owned utility
                 companies had been declining; however, the economy has been
                 improving, and credit ratings are now improving.

                 ENVIRONMENTAL CONSIDERATIONS

                      The production and delivery of electricity has undesirable
                 effects on the environment, Some ol these effects are

                      --land use effect caused by transmission rights-of-way,

                      --general esthetic effects such as noise and appearance,
                        end

                                               2U
<pb n="31" />

                   --interference with other spatial uses such as
                     approaches to airports arid waterway3.

              Electric utility companies must meet various Federal, State,
              and local environmental requirements that have significantly
              increased the time necessary for planning and constructing
              power facilities.

                   Also, the location of generating plants determines the
              location of transmission lines. While the plants may be en-
              vironmentally acceptable, the resulting transmission lines
              may have to cross land where the lines would be environmentally
              unacceptable. Therefore, lines, as well as plant locations,
              must be jointly evaluated. Environmental acceptability of one
              does not mean the same acceptance of the other.

                   Although the requirements of State and Federal agencies
              vary in specific information requested, all generally require
              information to evaluate the environmental impact of the
              facilities. For example, the Interior's Bureau of Land Manage-
              ment requires the applicant who wishes to construct a line
              across Federal lands to submit an application and conduct an
              environmental impact survey from which an environmental report
              is prepared. The report includes

                   --a description of proposed construction and

                   --information concerning the pro4ect's impact on air
                     space, air and water quality, scenic and esthetic
                     features, historical and archaeological features,
                     and wildlife, fish, and marine life.

                   The application and above required data are reviewed, and
              the district offico prepares an environmental analysis report
              of the proposed construction. The report assesses the impact
              the proposed transmission line will have on the surrounding
              environment and contains an environmental statement and analysis
              of alternatives. During preparation of the report, the public
              is informed ahout the proposed construction, and comments are
              solicited. The completed report is sent to the Council on
              Environmental Quality which distributes copies to appropriate
              Federal, State, and local Qovernment bodies and sees that a
              notice appears in the Federal Register.

                   If a decision is made that the construction will signif',_
              cantly affect the environment, then an environmental impact
              statement must be prepared. A notice of the final statement
              is published in the Federa.@ Register. The sta,zement is
              supposed to include

                                           21
<pb n="32" />

                    --a description of c(.nstruction,

                    --a description of environmental impacts,

                    --a summary of probable adverse environmental
                      effects which cannot be avoided,

                    --a description of the relationship between
                      local short-term uses and maintenance of
                      long-term productivity,

                    --a summary of irreversible and irretrievable
                      commitment of resources, and

                    --comments from the public, Federal, State,
                      and local governments.

              After the statement is approved by Interior, a permit is issued.
                    Utility and'land agency officials state that it generally
              takes about 18 months to 2 years to obtain right-of-way permits
              for larger transn-iission lines. If law suits are filed against
              the proposed construction, the time may be even longer.

                    Prese,it attitudes on protecting the environment are strong
              and legitimate. Environmental protection is not a peripheral
              aspect to constructing interconnections and, therefore, requires
              attention in planning such lines.

                    The following case exemplifies the many environmental
              considerations that have to be recognized.

                    Keeney-Salem transmission line

                    In 1965, Delmarva Power &amp; Light Company initiated plans for
              a 500-kV transmission line in Delaware to connect with the
              Pennsyl,@ania-New Jersey-Maryland Interconnection's 500-kV
              transmission system. The proposed line was designed to cross
              the State of Delaware extending from the western border with
              Maryland to the New Jersey State line on the eastern side of
              the Delaware River.

                    The Keeney-Salem interconnection has met continual concern
              from environmental groups.    Sinc2 1966 the following events
              have  affected the proposed line:

                    --The original layout, presented in 1966, was not con-
                      structed because (1) the location's proximity to an
                      airpcrt limited the height of the line, (2) the low

                                             22
<pb n="33" />

                    height   of the line  did not   allow  ships adequate
                    clearance  on the  Delaware   River,   and (3) the line
                    would  be,too close   to ahistoric     park and a
                    national  cemetery.
                  --A  second approach    required a right-of-way @paralleling
                    the river..,  Opposition was   made  to.this route   on
                    the basis that the line would      be  partly located
                    on tidal  marshland.and would traverse potertial,
                    parkland.
                 .--A third alternFtive    route  was  secured.   Construction
                    permit applications    for this route were    initiated
                    in  late,1969.   Subsequent   public   hearings raised
                    objections from local     @sailing clubs, that the I ine
                    would cause additional obstacles       in the riverand
                    would be esthetically     undesirable.    The utility
                    comp,any,.therefore., made,several     st-udies of both.
                    underground and@overhead alternatives.        None 'was
                    @found to be feasible. A construction permit for
                    the proposed site was obtained from the       Corps of
                    Engineers in July 1973.

                  --Planning and construction began      immediately. In
                    October 1973 the Corps    of Engineers, acting,on a
                    State  of Delaware ruling   " ordered work to    stop.
                    ..The Delaware State Attorney General s@--,@Ited that the
                    permit had been improperly issued because.the State
                    Water  and Air Resources Commission failed      to hold"'
                    a.public  hearing.    The utility company. filed a,
                    complaint in the.:courts challenging the State of:
                    'Delaware's position.
                  --The legal issues were    cleared and the permit needed
                    to.resume construction was givea by the Corps of
                    Engineers in August    1976. Construction began again
                    in Sept:ember 1976 and it is estimated that it will
                    be 15 months from start to finish.

                  This line will be   part of an.extension     of .500-kV bulk
            power   system in.PJM, and the two lines together      are necessary
            to  'deliver the output of nuclear generating      units to the vari-.
            ous load centers. Delayed construction of the.Keeney-salem
            transmission 1-ine has required     implementation of, emergency
            .operating procedures on several occasions to@relleve critical
            line  loadings.

                                             23
<pb n="34" />

               INSTITUTIONAL CONSTRAINTS

                    The existence of statutes, policies, and contracts has
               caused institutional constraints to constructing transmission
               facilities. Such institutional constraints have kept utilities
               from considering or entering into some interconnection projects,
               while delaying some others. During our review, we identified
               the fc1lowing instances affecting the construction of inter-
               connections.

               Reluctance of Texas
               utiliF-iesto interconnect

                    ERCOT prohibits any of its member compenies ---:rom inter-
               connecting with systems outside of Texas. This prevents
               members from buying or selling electric ener-gy in interstate
               commerce.

                    The Central and Southwest Corporation, a public utility
               holding company, had operating subsidiaries in both ERCOT and
               SPP. Eac'11 subsidiarv represented an economic operating area
               responsible for dLSiatching electric power within its bound-
               aries. The-@ su@-A'iaries include:

                             Service Company of Oklahoma.

                    --!;outhwestern Electric Power Company.

                    --Central Power and Light Company.

                    --West Texas Utilities Company.

               West Texas Utilities Company, at that time, had divisions in
               each Council and had two economic operating areas. Subse-
               quently, West Texas Utilities Company's divisions merged and
               now belong to the same council (SPP).

                    In November 1975 the Corporation released an exp,:nsion
               study covering a 20-vear period (1975-95) examining the relative
               @conomies of continuing the isolated pattern or operaLing as an
               interconnected system.. The study recognized that the operating
               pattern had been well suited to an era when low cost and abun-
               dant oil and natural gas supplies were available locally to
               use as fuel for power generation. It also recognized that fuel
               conditions are undergoing a fundamental and probably irrever-
               sible change, and that recent emphasis on oil and natural qas
               conservation indicates the future baseload generation for the
               Corporation will be coal-fired or nuclear.

                                             24
<pb n="35" />

                The expansion study indLcated that additional loncun total
           economic benefits of $38.7 million by 1995 were availatLe through
           interconnecting the operatiois of the four Corporation 3ubsid-
           iaries. However, these potential benefits to interconnicted
           operation could not be realized because of ERCOT's memt-@rship
           requirement. The savings are primarily the result of operating
           economies available when using an economic dispatch which con-
           siders the consolidated electrica: load of the entire inter-
           connected area. The Corporation began a more detailed study
           of the specific costs and benefits in Januai-y 1976.

                An additional potential savings of $227 million l/ above
           the $38.7 million discussed above is available if full, coor-
           dinated use can be made of the transmission systems in Texas
           to transfer power between the Corporation's operating subsid-
           iaries. In this situation, short-high-capacity interconnections
           could be put in place between ERCOT and SPP. Preliminary
           indications are that the Corporation's power transfers would
           not adversely affect the load of existing and planned ERCOT
           circuits. However, detailed load flow and stability studies
           are still required.

           Legal limitation on Bonneville Power
           Administration energy transfers

                Public Law 88-552 (16 U.S.C. 823) limits BPA in trans-
           ferrinq surplus energy from the Pacific Northwest, and therefore,
           restricts utilities outside the Pacific Northwest from either
           constructing additional interconnections or increasing the
           capacity of t',e existing interconnections.

               The act requires BPA to serve the requirements of the
              fic Northwest before marketing such power and energy out-
           Paci
           side the region. The act states that the export of Federpl
           hydroelectric power in the Pacif ic Northwest is limited to
           surplus energy and surplus peaking capacity, and notes that the
           Secretary of the Interior can stop delivery of the surplus energy
                                                        i t 4
           by giving notice, within 60 days, of any cond @ons that may
           impair the Northwest's energy. The act also states that the
           Secretary may terminate any contract of surplus peaking capacity
           upon notice within 5 years.

               The 5-year provision, while protecting the Northwest,
           removes opportunities for new long-term contracts for power with

           l/ The study does not recognize the impact that may accrue to
             other utilities.

                                       25
<pb n="36" />

           Southwestern utilities. Without the assurance of a loi-g-term
           contract, utilities we contacted state they would have no
           guarantees to meet their energy needs and justify their invest-
           ment in new interconnections.

                                        26
<pb n="37" />

                                              CHAPTER 5

                                CONCLUSIONS,      RECOMMENDATIONSt

                                                 CY COMMENTS
                                       AND  AGEN

             CONCLUSIONS
                   Althou                                   pear adequate to meet
                         gh   present    interconnections ap
             our  current   needs based      on experience     to  date,   Federal    and
          -independent      studies    of   the reliability and adequacy    of  the
              national power supply   indicate    that.  future reliability       and
             adequacy of    the electric bulk power          supply depends, on      the
             timely installation of new   generation and transmission facil-
             ities.to.meet our future needs.Further, several studies
             indicate that additional interconnections are economic. Un-
             fortunately, there is little or no concensus on the             validity,
             of these studies.
                   This conclusion stems in part from our belief  that   FPC
             has  not effectively carried out its existing responsibilities
             of  promoting and coordinating interconnectio throughout the,
             Nation. Its recent studies  have been conducted primarily in
             the Southwest and have received only partial acceptance by
             the utility industry.  Interconnection studies have. also been
             independently made by utilities,the Bureau of Reclamation,
             BPA, and others without FPC involvement.
                   We  believe that FPC should establish national criteria   to
             be used in considering needed interconnections because there
             may be many instances where an interconnection could present
             minimal or no economic advantage (or disadvantage)to a utility
             but could provide advantages to a region or the Nation. These
             criteria should allow consideration of such goals as  energy
             conservation, reduced transmission and generation, reliable
                                    ices, and.national defense. Each  of
             national emergency serv
             these goals is becoming increasingly important as the Nation's
             domestic energy supplies decrease.
                   National resource objectives and resovrce policy have   not
             b,een considered by utilities as a benefit of an interconnection.
             Uniesslan interconnection shows economic benefits to one or
             more of the interconnecting parties, a utility will not act on.
             its own to install it.  We believe that consideration of such
             goals should,be an integral part of the interconnection planning
             process.
                   ERDA is developing criteria for the study of electric util-
             ity  system    expansion. ERDA sees this as an   initial  step,      which
             we  believe has  considerable value in identifying factors-which

                                                    27
<pb n="38" />

          should be taker, into account in identifying and evalu,-,ir
          potential interconnections.    FPC, in establishing nationEL
          interconnection criteria, should consider and use, where
          practical, the results of ERDA's study.

               The establishment ck such criteria would be a first step
          in making the utilities aware ot the seriousness of the Govern-
          ment's interest in promoting interconnections. If the criteria,
          once established, are not used by the utilities in their deci-
          sionmaking, then FPC s@--,uld move to seek legislative autt-ority
          to compel their considccation. We belipve, however, it is
          premature to move lo suct.,compulsory action at this time,

               A recent study prepared for the Congressional Research
          Service pointed out that interconnection studies have been
          nerformed but that additional evaluation of those studies is
          needed. However, despite this need, no entity--Federal or non-
          Federal--assures that such further evaluations will be made.
          Tile only followup action that might be initiated would be if the
          specific participants decide on their own to further evalL@ate
          the interconnections.

               We believe that a need exists for FPC to promote a joint
          Federal-utility effort to systematically (1) idenitfy and
          study future interconnections 3n a regional and inter-regional
          basis, and (2) follow up on previous studies to determine whv
          the utilities have not implemented them or further analyzed the
          proposed interconnection.

               The interconnection studies that result from these joint
          planning efforts should recognize the various purposes, needs,
          and objectives of each organization involved, as well as
          national goals. This coordination should insure that differ-
          ences among oraanizations will be idpntified and discussed,
          and ultimately improve the opportunity for their resolution.

               Financial, environmental, institutional, and technological
          factors are affecting the utility industry's caility to provide
          its customers with completely reliable servico at the lowest
          prices consistent with our Nation's social and environmental
          goals. Joint Federal-industry studies shoul-I include a deter-
          mination of the impact of all relevant lactors and consider-
          a@ion of methods to develop alternative plans for providing
          the needed services.

                                        28
                                                                                  Ile,
<pb n="39" />

          RECOMMENDATIONS TO THE CHAIRMAN, FPC

               We recommend that the Chairman, FPC

               --take the lead in promoting, throughout the Nation,
                 joint Federal-industry studies to identify and
                 evaluate new interconnections and changes in existing
                 interconnections,

               -
                 follow up on compleced interconnection studies to
                -resolve objections to the studies which might result
                 in adoption of study recommendations,

                 work with utilities to establish criteria for carrying
               --out interconnection studies which will require ad-
                 equate consideration of national goals and timely
                 identification of factors which may adversely
                 affect the proposed interconnection, and

               --work with the utilities to make sure the criteria
                 are used; if they are not used voluntarily within
                 a reasonable zi'me after their release, the Commission
                 should cons4'i.!,-r whether further steps should be
                 taken to compel their consideration, including
                 seeking addit-onal legislation as necessary.

          AGENCY COMMENTS AND OUR EVALUATION

          0epartmenz of the In:erior

               Interior stated in their lc-tter of November 29, 1976,
          (3ee app. II), that our report presents a comprehensive anal-
          yE.is and agrees that transmission and generation should be
          planned to consider the advantages interconnections r-,,ay offer
          for pursuing national or regional energy conservation programst
          reduced transmission and generation investment, emergency
          service, and national defense.

               Interior pointed out that two of their studies were of
          an exploratory nature and for this reason, all. potenti,,l
          parties were not includeJ. We believe, however, that any
          interconnection studies should be of a joint nature to
          include all parties.

          Federal Powei Commi=-:-"nn

               FPC said in the:.- 16tter of November 3, 1976, that there
          is little basis presented ir, our report to conclude that FPC
          has not effectively carried out its responsibilities in pro-
          moting interconnections and that the current network speaks
          for itself.. (See app. III.)

                                        29
<pb n="40" />

                       According to NERC, iowever, it has been the in '.tiative
                  of industry to interconn @ct and not because of FPC )r any
                  other Government agency.   We believe the future eleftrical
                  demands win require joiat studies and that natione - criteria
                  should be considered.  Trierefore, it is important f )r FPC
                  to follow its mbndate to promote interconnections.

                  National Electric Reliability Council

                       NERC said that the present system of interconnections is
                  a result of the efforts and good judgment of highly qualified,
                  dedicated engineers and executives who are intimately involved
                  in these matters.  NERC said that the present system of inter-
                  connections is a rcsult of the planning and development by the
                  electric utility industry.

                       We agree that the present system should be attributed to
                  the electric utility industry; however, we believe that the
                  future electrical demands will require joint studies and that
                  national criteria should be considered.   Therefore, it is
                  important that industry and the Government work toqether to
                  achieve this.

                                               30
<pb n="41" />

                        APPENDIX I                                                                APPENDIX 1

                              "7L

                                                                                                        711

                                                               01

                                              NATIONAL ELECTRIC RELIABILITY COUNCIL

                                         Coal C,&amp;@ffi Afso
                                    ECAS       00@mms_         MAIN ""@  a               SERC
                                                                   InIO-DW Ne
                                                                     Pi .0 C-'-' Ala.
                                    EnCOT E@00@ lPloo-ab-y     MARCA ov.     ld-,.@      SPP       P- P@
                                          co@ a, U."                 Aq-
                                          !fW A@               PiFCC ,,l  p*am:.0009
                                    MA.AC r'.                       C,"a-a @g Co.        wscc cW0

                                                                   31
<pb n="42" />

                           APPENDIX IT                                                              APPENDIX II

                                             United States Department of the Interior

                                                          OFFICE OF THE SECRE.ARY
                                                           %'@ASHINGTON, DC 2W40

                                                                                          NOV 20 1976

                                       Mr. Monte Canfield, Jr.
                                       Director, Energy and Minerals Division
                                       General &amp;ccounting Office
                                       Washington. D.C. 20548

                                       Dear Mr. Canfield:

                                       We have reviewed your proposed report to the CongreRs entitled "Problems
                                       in Planning and Constructing Transmission Lines w7hich Interconnect Utili-
                                       ties" forwarded with your letter of October 4, 1976.   While the report
                                       makes no reconnendations. to the Department. we oifer the following comments
                                       in the hope that they will be useful in clarifying certain sections of the
                                       report.                  General Comments

                                       The subject draft report presents a comprehensive analysis of a highly
                                       romplex subject.  The GAO should be commended for the scope of its efforts
                                       and its presentation of a very difficult subject.

                                       The main impact of the report suggests that the Federal Power Commission
                                       (FPC) establish and ensure the uFe of national criteria In future inter-
                                       conr-@ction studies.  The point is well taken,  We feel transmission and
                                       generation should be planned to consider the advantages interconnect ions
                                       may offe- for pursuing national or regional energy conservation programs,
                                       reduced 7ransmission and generation investment, emergency service, and
                                       national aefense.

                                       The Department of the Interior chouI6 be actively involved in any inter-
                                       connection planning since often regional iiterties require an inter-
                                       connection with one cr more af the five power marketing agenrics of the
                                       Department.

                                       The report is somewhat critical of past actions of the Department.   The
                                       Bureau of Reclamation's authority for involveniia In transmission inter-
                                       ties is limited. Until the sign  ing of Public Law 94-156 on December 16,
                                       1975, the authority granted to the Secretary of the Interior. by the
                                       Reclamation Act of 1939 and the Flood Control Act of 1944, to be involved
                                       in power transmission wqs related to the marketing of surplus power from
                                       Federal hydroprojects.   Acting witoin that authority, Reclamation has con-
                                       ducted or participated in several joint studies of interties.

                                 LoTjo,,

                             FC         M

                                                                      32
<pb n="43" />

                         APPENDIX II                                                                     11,PPENDIX II

                                 The draft report makes, no .-tention of studies that led to the evt       tual
                                 construction of interconnE tion transmission intertics.          Both ti    Bureau
                                 and the Bonneville Power A ministration (BPA) 'nave coordinated a         -me
                                 interconnection studies wi-h customers and other affected utilit           es.
                                 For example, the 3,900 KvJ .:apacity Pacific Norchwest-Pacific Sot         hwest
                                 intertie was constructed f 111owing a series of studies conductel          jointly
                                 by Interior agencies and tne utilities durIng the early 1960's.            Further-
                                 more, current studies are in progress, conducted by the same orl         inizations,
                                 which consider increasing the capacity Of the intertie lines by          4,400 K-4.

                                 While the report criticizes Reclamation for conducting studies without
                                 involving all potential interested partieg, what seems to have been over-
                                 looked is the necessity to make a preliminary analysis of possibilities
                                 before in-depth studies can be formulated.        The szudies cited by GAO
                                 have all been reconnaissance- leve I studies attem?ting to determine whether
                                 further in-depth analysis Is justified.        Both the "Trai.smj-.:;ion Study 190"
                                 and the March 1975 "Intertie Appraisal Study," referred to in the report,
                                 were of an explorat-sry nature, as evidenced by the fact that the primary
                                 recommendation in the report of each of thc@e stud, s 2 - for forther
                                 study.

                                                            Specific Comments

                                 Digest, Page 1.    In aJd1tion to the listed advant@.&amp;cs, an economy which can
                                 be realized by the interconnection of utilities is a reduction of trans-
                                 mission capital investments and of environmental impacL. These costs
                                 and Impacts can result from th2 reduction of facility duplication.            It
                                 should be noted, however, that while transmission intertles can materially
                                 assist in energy conservation, this may not always be true.           Transmission
                                 interties may enable the use of somewhat more efficient energy conversion
                                 installations to supply energy to consumers or enable a diiferent raw
                                 energy resource to be used in conversiOLI to electrical ent.:Zy, such as
                                 the use of Water that may otherwise be srilled.         Cnly the gain In energy
                                 conversion efficiency can contribute to energy cor@;ervatl-n. and this may
                                 be offset in part by transmission energy losses.

                                 We think it would be useful to discuss in more detail in the body of the
                                 report the benefits to the nation of saving diminishing fossil fuel
                                 supplies, such as gas and oil, which would occur as a result of some
                                 interconnections.

                                 Page 3, Second Paragraph   *   The report states that Interior studie3 did
                                 not involve the affecEed utilities.       BPA has perfor-mpd many interconnec-
                                 tion studies in the Northwest involving the a.c. and d.c. interties,

                                                                        33
<pb n="44" />

                          APPENDIX II                                                                     APPENDIX II

                                  The draft report makes no :.ention of studies that led to the eve tual
                                  construction of interconnection transmission intertics. Both the Bureau
                                  and the Bonneville Power AdminiEtration (BPA) have coordinated    me
                                  interconnection studies with customers and other affected utili  es.
                                  For example, the 3,900 V apacity Pacific Northwest-Pacific Southwest
                                  intertie was constructed following a series of studies conducte  jointly
                                  by Interior agencies and the utilities during the early 1960's.       Further-
                                  more, current studies are In progress, conducted by the same organizations,
                                  which consider increasing the capacity of the irtertie lines by  ,400 MW.

                                  While the report criticizes Reclamation for conducting studies without
                                  involving all potential interested parties, what seems to have been over-
                                  looked Is the necessity to make a preliminary analysis of possibilities
                                  before in-depth studies can be formulated.   The SLudies cited by GAO
                                  have all been reconnaissance- leve I studies attempting to determine whether
                                  further in-depth analysis is justified. Both the "Transmission Study 190"
                                  and the March 1975 "Intertie Appraisal Study," referred to in the report,
                                  were of an exploratory nature, as evidenced by the fact that the primary
                                  recommendation in the report of each of these stud s       for farther
                                  study.

                                                             Specific Comments

                                  Digest. Page 1.  In addition to the listed advantages, an economy which can
                                  be realized by the interconnection of utilities is d reduction of trans-
                                  mission capital investments and of environmental impact. These Costs
                                  and impactF can result from the reduction of facility duplication.  It
                                  should be noted, however, that while transmission InLerties can materially
                                  assist in energy conservation, this may not always be true.  Transmission
                                  interties may enable the use of somewhat more efficient energy conversion
                                  installations to supply energy to consumers or enable a different raw
                                  energy resource to be used in coriversion to electrical energy, such as
                                  the Use Of Water that may otherwise be spilled. Only the gain in energy
                                  conversion efficiency ran contribute tn energy conservation, and this may
                                  be offset in part by transnisslon energy losses.

                                  We think it would be useful to discuss in more detail in the body of the
                                  report, the benefits to the nation of saving diminishing fossil fuel
                                  supplies, such as gas and oil, which would occur as a result. of some
                                  interconnections.

                                  Page 3. Second Paragraph.     The report states that Interior studies did
                                  not Involve the affected Utilities.  BPA has performed many inrerconnec-
                                  tion studies in the Northwest Involving the a.c. and d.c. interties,

                                                                         33
<pb n="45" />

                          APPENDIX Il                                                           APPENDIX II

                                 Canadian Interties, and interties proposed to Montana, Coistr[p, etc.
                                 All of these studies involved the affected utilities and the results,
                                 -generally, were accepted by the affected utilities.

                                                (See GAO note 1. P. 36.1

                                 Chapter 3, Pages_24 and 25. The discussion of the "Interior study"
                                 requires some editing such as:

                                                [See GAO note 1. P. 36.1

                                      Page 25, paragraph 2 - W,! recom;,end deletion. Me Lffort bcing
                                      discussed is an appraisal to determine whether a "study" would
                                      be worthwhile. It is not practicable to have initial appraisal
                                      activity become multiorganization efforts.

                                 ChApter 3, Page 27, Last Paragraph. We agree with the report's statement
                                 that to be successful, joint studies involving thc technical experts of
                                 the utilities are essential. We would go one step farther and say that
                                 the studies should incorporate environmental concerns from their inception.
                                                [See'GAO note 1, p. 36.]

                                                                  34
<pb n="46" />

                      APPENDIX II                                                              APPENDIX II

                             Chapter 4, Page 31, Fnvironmental Considerations, First Paragraph.
                             The Effects listed in the report appear to deal only with transmission,
                             not generation and marketing. This paragraph could also list:

                                  "--The physical effect of rEmoval of land from other uses;
                                   --The effect of construction and operation on natural resources
                                     such as soil, vegetation, air, and water;
                                   --The esthetic effects of noise and appearance;
                                   --The economic effects."

                             In light of GAO's recommendation LhaL joint rederal utility studies be
                             conducted. when Federal lands or marketing agencies are involved It
                             would appear appropriate that such studies should fall under the Federal
                             lead agency role established by the National Environmental Policy Act
                             (NEPA). 'Me meeting of environmental requirements could be expedited by
                             the consolidation of Intergovernmental Coordination (A-95) and NEPA
                             reviews at the Federal level. BPA. in effect, does this with very few
                             delays in projects occurring as a result of NEPA and other environmental
                             legislation. Intertie studies might be conducted by a joint Federal/
                             utility task group cunsisting or both utility technical and environ-
                             mental planning expertise. Such expertise should be drawn from the
                             Utilities and the land management agencies involved. Such a task team
                             under the Department of the Interior Federal lead agency designation
                             could ensure that environmental factors are considered in the technical
                             analysis of the intertie requirements. It would also provide a team
                             which could complete the environmental impact statement resulting from
                             Cop proposal generated by the feasibility studies.

                                          [See GAO note 1, P. 36.]

                             Chapter 4, Page      Second Paragraph.   The report cLarvr char the 5-year
                             commitment limits long-term contracts with Southwestern utilities.    It
                             should be noted that FPA has 20-year power salts contracts with utilities
                             outside the region with 5-year pullback provisions for specific purposes
                             only.

                             This paragraph ignores the possibility of developing diversity exchanges.

                                                                35
<pb n="47" />

                      APPENDIX II                                                          JIPPENDIX II

                                            [See GAD note 1, p. 36.]

                             We appreciate the opportunity to comment on this very important subject.

                                                               Sincerely,

                                                        DePUt?AssistanL Secretary
                                                               Administration and Management

                                       GAO notes:

                                            1.  The deleted comments relate to matters which
                                                were discLssed in the draft report but omitted
                                                from this final report.

                                            2.  Page references in this appendix refer to the
                                                draft report and do not agree with the page
                                                number in the final report.

                                                              36
<pb n="48" />

              APPENDIX III                                          APPT:NDIX 1II

                                      FEDERAL POWER COMMISSION
                                         WASHINGTON. D.C. 20426
                                                                  IN REPLY R, FER TO.

                                                                 NOV 3 1976

                  Mr. Monte Canfield, Jr.
                  Director, Energy and Minerals Division
                  U. S. General Accounting Office
                  Washington, D. C. 20548

                  Dear Mr. Canfield:

                       This is in response to your letter of October 4, 1976,
                  inviting our comments on the draft of your proposed report
                  to Congress to be entitled, "Problems in Planning and
                  Constructing Transmission Lines Which Interconnect Utilities."
                  A detailed review of the proposed report has ind-icated that
                  it is deficient in some areas and that some of the reported
                  conclusions are nut supported by the facts in the text.

                       The GAO letter dated Februany 12, 1975, initiating this
                  study stated that it was intended to be a general survey
                  into the potential for increased effectiveness of
                  interconnection and transmission systems for electric power.
                  We feel that this would still be a more appr-3priate title
                  for the report. This proposed report to the Congress by no
                  means lists all the problems nor analyzes them as the
                  present title might lead one to -@xpect.

                       It is of particular concern to us that very little
                  wntion is made of the nine existing Electric Reliability
                  Councils, of the work they are doing, or of the role that
                  the Federal. Power Commission has taken in initiating and
                  continuing their work to provide an adequate and reliable
                  bulk power supply in the United States.

                       It is our opinion that the nine Councils and tht!
                  National Electric Reliability Council, working together
                  and with the FPC, have made great strides toward assuring
                  an adequate bulk power supply. A key pz!rt of this effort
                  is the coordination and interconnection of the electric
                  systems not only within each region but among regions. A
                  comparison of the regional interconnections existing in
                  1967 with those existing today and with those @Janned will
                  WTI%
                     0/ CN

                       4

                                              37
<pb n="49" />

                APPENDIX TT1                                          APPENDIX III

                     Mr. Monte Canfield, Jr.

                     i-ndicate a significant amount of interconnection progress.
                     Although this endeavor on the part cf the -industry has been
                     pLimarily voluntary, there seems little question that the
                     interest, the participation and the urging of the FPC has
                     been most instrumental in the progress that has been made.

                          The Commission has under consideration legislative
                     proposals that would give it authority to order electric
                     power wheeling under certain conditions. It should be
                     pointed out that if this authority should be granted, one
                     of 1@he most important questions which we will have to face
                     will be the decision on reasonable economic ard financial
                     terms for the provision of services.

                          The report states that the FPC has not effectively
                     carried out its responsibilities in pr3moting interconnections.
                     We believe that there is little basis presented in the
                     proposed report for this conclusion. At one point, the
                     report presents the oppo6ite opinion when it states that
                     existing interconnections are adequate.

                          We feel that the incorporation of the more detailed
                     comments attached would strengthen the report. We would
                     be happy to meet with you and your staff at your convenience
                     to discuss these comments and other thoughts we may-both have.

                                                   Sincerely yours,

                                                   Richard L. Dunham
                                                   Chairman

                     Enclosure  (See GAO note.]

                          GAO note: The enclosure is not included here but was
                                   considered in this report.

                                                38
<pb n="50" />

         APPENDIX IV                                          APPENI.CX IV

                        PRINCIPAL OFFICIALS RESPONSIBLE

                         FOR ADMINISTERING ACTIVITIES

                           DISCUSSED IN THIS REPORT

                                                          Tenure of office
                                                        From        To
         CHAIRMAN:          FEDERAL POWER COMMISSION

             Richard L. Dunham                          Oct. 1975   Present

             John N. Nassikas                           Aug. 1969   Oct. 1975

         CHIEF, BUREAU OF POWER

             Whitman Ridgway                            Apr. 1976   Present

             Whitman Ridgway (acting)                   Feb. 1976   Apr. 1976

             T. A. Phillips                             Nov. 1970   Jan. 1976

                                         39
<pb n="51" />

                                                                                                                                                                    "b        I
                                                                                                                                                                              r

                                                                                                                                                                             imr--

                                                                              I MI NIIIIIIIIIIIIII @                                                                     I
                                                                           -1 3 6668 00001 5802                                                                         1
</text>
</doc>