		<mainTitle nfc="0"><title>Energy facility siting in the Great Lakes coastal zone</title>:<titleExt>analysis and policy options : final report, January 14, 1977</titleExt>/<respStmt>prepared for the Office of Coastal Zone Management, National Oceanic and Atmospheric Administration, United States Department of Commerce, and the Standing Committee on Coastal Zone Management, Great Lakes Basin Commission by the staff of the Great Lakes Basin Commission.</respStmt></mainTitle>
	</titleStmt>
	<authorStmt>
		<corpAuthor mainEntry="y"><name type="jurisdiction">United States.</name><subName>Great Lakes Basin Commission.</subName></corpAuthor>
		<corpAuthor><name>National Ocean Survey.</name><subName>Office of Coastal Zone Management.</subName></corpAuthor>
		<corpAuthor><name type="jurisdiction">United States.</name><subName>Great Lakes Basin Commission.</subName><subName>Standing Committee on Coastal Zone Management.</subName></corpAuthor>
	</authorStmt>
	<imprint>[<pubPlace>Washington</pubPlace>] :<pubName>Dept. of Commerce</pubName>,[<pubDate>1977].</pubDate></imprint>
	<classStmt>
		<locClass>
			<subject cat="top">Industrial sites</subject>
			<subject cat="geo">Great Lakes.</subject>
		</locClass>
		<locClass>
			<subject cat="top">Energy facilities</subject>
			<subject cat="geo">Great Lakes.</subject>
		</locClass>
		<locClass>
			<subject cat="top">Energy policy</subject>
			<subject cat="geo">Great Lakes.</subject>
		</locClass>
	</classStmt>
</metadata>

<text xml:space="preserve">
<pb n="1" />

   ,oa@tal Zon'e
    nformation
      tenter
                                                                       CnP.STAL ZONIE,
                 eport
       January 14, 1977                                                                     HEENTER
       Energy Facility Siting In
       The Great Lakes Coastal Zone.
       Analysis.And Policy Options

       Great Lakes Basin Commission for
       The Office Of Coastal Zone Management
       National Oceanic And Atmospheric Administration
       U. S. DEPARTMENT OF COMMERCE

                              A

                                                                                    j

                                                                     -A
                                                             4

                                                                                                wo I

           HD
           9502
           U558
            1977
            c.2
    asta   Zone
    fo rn jo
   @_no rat   n
         t  r
      Cen je
<pb n="2" />

																	12478

                                                       COASTAL ZONE
                      Final Report                     INFORMATION CENTER,
                      January 14,  1977

                      Energy Facility Siting In
                      The Great Lakes Coastal Zone:
                      Analysis And Policy Options

                      Prepared for
                      The Office of Coastal Zone Management
                      National Oceanic and Atmospheric Administration
                      U.S. DEPARTMENT OF COMMERCE

                      (Under Contract No. 6-35350)

                      And The Standing Committee on Coastal Zone Management,
                      Great Lakes Basin Commission

                      By The Staff of The Great Lakes Basin Commission:
                      Charles A. Job, Project Manager, Reed M. Bohne,
                      Robert H. Clemens, Thomas Gross, John R. Hall,
                      John A. Johansen, Williarn E. Skimin, David M. Staples,

                      (With the assistance of:
                      Gerald Kotas, Jonathan Mayer, and Timothy Monteith)
<pb n="3" />

                                                                 COASTAL ZONE
                                                                 INFO&amp;VATION CENTER

                                            TABLE OF CONTENTS

                                                                                              Page

              LIST OF TABLES  . . . . ... . . . . . . . . . . . . . . . . . . . . . . . .      xi

              .LIST OF FIGURES  . . . . . . . . . . . . . . . . . . . . . . . . . . . . .      xv

              PREFACE   . . . . . . . . . . . . . ... . . . . . . . . . . . . . . . . . .     xvii
              ACKNOWLEDGEMENTS  . . . . . . . . . . . . . . . . . . . . . . . . . . . . .      xix
              EXECUTIVE SUMMARY   . . . . . . . . . . . . . . . . . . . . . . . . . . . .        1

              INTRODUCTION  . . . . . ... . . . . . . . . . . . . . . . . . . . . ... . .      13
              A.  State and Federal Activities Affecting Energy Facility Siting                14
              B.- Concern of the Great Lakes States Coastal Zone Management Programs
                  for Energy Facility Siting   . . . . . . . . . . . . . . . . . . . . . .     15
              C.  Development of the Study   . . . . . . . . . . . . . . . . . . . . . . . .   15
              D.  Organization and Functions   . . . . . . . . . . . . . . . . . . . . . .     17
              E.  Limitations of the Study   . . . . . . . . . . . . . . . . . . . . . . .     18

              F.  Important Facts and Definitions    . . . . . . . . . . . . . . . . . . .     19

              G.  Policy Options and Their Application                                         21
              H.  Additional Application of the Report   . . . . . . . . . . . . . . . . .     22

              INSTITUTIONAL CONSIDERATIONS   . . . . . ... . . . . . . . . . . .               27

              A. Introduction   . . . . . . . . . . . . . . . . . . . . . . . . ... . . .      27@
                  1. Purpose    . .. . . . . . . . . . . . . . . . . . . . . . . . . . . .     27
                  2. Scope    . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .      27
              B. Energy Facility Siting Regulation     . . . . . . . . . . . . . . . . . .     28

                  1.  Federal   . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..     28

                      a.  Coastal Zone Management Act (CZMA)    . . . . . . . . . . . . . .    28
                      b.  National Environmental Policy Act     . . . . . . . . . . . . . .    40
                      c.  Nuclear Regulatory Commission    . . . . . . . . . . . . . . . .     42
                      d.  Environmental Protection Agency    . . . . . . . . . . . . . . .     44

                      e.  Federal Power Commission   . . . . . . . . . . . . . . . . . . .     59

                      f.  Corps of Engineers   . . . . . . . . . . . . . . . . . . . . . .     60
                      g.  Federal Aviation Administration    . . . . . . . . . .. . . . . .    61

                      h.  Coast Guard   . . . . . . . . . . . . . . . . . . . . . . . . .      61

                      i.  Federal Energy Administration    . . . . . . . . . . . . . . . .     61

                  2.  Great Lakes States  . . . . . . . . . . . . . . . . . . . . . . . .      62

                      a. Illinois   . . . . . . . . . . . . . . . . . . . . . . . . . . .      62

                      b. Indiana    . . . . . . . . . . . . . . . . . . . . . . . . . . .      65

                      c. Michigan   . . . . . . . . . . . . . . . . . . . . . . . . . . .      66
<pb n="4" />

                                                    iv

                                     Table of Contents (Continued)

                                                                                               Page

                      d.   Minnesota   . . . . . . . . . . . . . . . . . . . . . . ... . .       70

                      e. New York    . . . . . . . . . . . . . . . . . . . . . . . . .. . .      72

                      f.   Ohio . . . . . . . . . . .   . . . . . . . . . . . . . . . . . .      79

                      g. Pennsylvania    . . . . . . . . . . . . . . . . . . . . . . . . .       86

                      h. Wisconsin                                                               89

                  3.  Other Coastal States   . . . . . . . . . . . . . . . . .. . . . . . .      91

                      a. California    . . . . . . . . . . . . . . ... . . . . . . . . . .       91

                      b.   Maine  . . . . . . . . . . . . . . . . . . . . . . . . . . . .        94

                      c.   Maryland  . . . . . . . . . . . . . . . . . . . . . . . . . . .       96
                      d.   Massachusetts   . . . . . . . . . . . . . . . . . . . . . . . .       99
                      e.   Oregon . . . . . . . . . . . . . . . . . . . . . . .                 102
                      f.   Washington  . . . . . . . . . . . . . . . .. . . . . . . . . . .     106
                  4.  Comparative Analysis of State Programs    . . . . . . . . . . . . . .     107
                      a. Selected Features of State Programs       . . . . . . . . . . . . .    107
                      b. Evaluation Criteria     . . . . . . . . . . . . . . . . . . . . .      113

                  5. Implications for Policy Options      . . . . . . . . . . . . . . . .. .    116

        IV. TECHNICAL CONSIDERATIONS

             A. Environmental and Economic Factors Affecting the       Siting of Energy
                  Facilities and Analysis of   Coastal  Dependence of  Facilities   . . . . .   119

                  1.  Introduction   . . . . . . . . . . . . . . . . . . . . . . . . . . .      119

                      a. Purpose     . . . . . . . . . . . . . . . . . . . . . . . . . . .      119
                      b. Scope    . . . . . . . . . . . . . . . . . . . . . . . . . . . .       119
                      C. Study Approach    . . . . . . . . . . . . . . . . . . . . . . . .      119
                      d. Definition of Coastal Dependency     . . . . . . . . . . . . . . .     120
                  2.  General.Siting Considerations     . . . . . . . . . . . . . . . . . .     120
                      a.   System Planning   . . . . . . . . . . . . . . . . . . . . . . .      121
                      b.   Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . .       121
                      C.   Engineering   . . . . . . . . . . . . . . . . . . . . . . . . .      121
                      d.   Environmental   . . . . . . . . . . . . . . . . .... . . . . . .     121
                      e.   Institutional/Regulatory   . . . . . . . . . . . . . . . . . . .     122
                      f.   Economics                                                            122
                  3. Facility Descriptions and Siting Requirements       . . . . . . . . . .    122
<pb n="5" />

                                             v

                              Table of Contents (Continued)

                                                                                        Page
               a. Fossil Fuel (Coal) Power Plants      . . . . . . . . . . . . . . .     122
                    (1)  Description  . . . . . . . . . . . . . . . . . . . . . .. .     122
                    (2)  Site Requir-ements  . . . . . .  . . . . . . . . . . . . . .    123
                         (a)  Land Requirements
                         (b)  Location with Respect to Population
                         (c)  Water Requirements
                         (d)  Transportation Access
                         .(e) Seismology and Geology
                         (f)  Hydrology and Meteorology
                    (3)  Environmental and Other Considerations     . . . . . . . . .    135
                    (4)  Emerging Technologies   . . . . . . . . . . . . . . . . . .     136
               b. Nuclear Power Plants    . . . . . . . . . . . . . . . . . . . . .      143
                    (1)  Description  . . . . . . . . . . . . . . . . . . . . . . ..     143
                    (2)  Site Requirements   . . . . . . . . . . . . . . . . . . . .     145
                         (a)  Land Requirements
                         (b)  Location with Respect to Population
                         (c)  Water Requirements
                         (d)  Transportation Access
                         (e)  Seismology and Geology
                         (f)  Hydrology and Meteorology
                    (3)  Environmental and Other Considerations     . . . . . . .        158
                    ,(4) Emerging Technologies  .. . . . . . . . . . . . . . . . . .     159
               c. Fuel   Transshipment and Storage Facilities     . . . . . . . .        160
                    (1)  Facility Types   . . . . . . . . . . . . . . . . . . . ...      162-
                         (a) Coal
                         (b) Oil
                         (c) Nuclear Fuel
                    (2)  General Considerations    . . . . . . . . . . . . . . . . .     165
                         (a)  Systems Requirements
                         (b)  Safety
                         (c)  Engineering
                         (d)  Environmental
                         (e)  Institutional
                         (f)  Economics
<pb n="6" />

                                                vi

                                   Table of Contents (Continued)

                                                                                            Page

                                     . . . . . . . . . . . . . . . . . . .   . . . . . . .  167
                         (1)  Description  . . . . . . . . . . . . . . . . . . . . . . .    167
                         (2)  Site-Requirements  . . . . . . . . . . . . . . . . . . . .    167
                              (a) Land Requirements
                              (b) Location with Respect to Population
                              (c) Wate r Requirements
                              (d) Transportation Access
                              (e) Seismology and Geology
                              (f) Hydrology and Meteorology
                         (3)  Environmental and Other Considerations                        174
                         (4)  Summary . . . . . . ... . . I . . . . . . . . . . . . . . .   175
                4. Environmental and Economic Impact Analysis     . . . . . . . . . . . .   175
                    a.   Introduction . . . . . . . . . . . . . . . . . . . . . . . . .     175
                         (1)  Framework Approach   . . . . . . . . . . . . . . . . . . .    175@
                         (2)  FacilIities Activities . . . . . . . . . . . . . . . . . .    176
                         (3)  Impacted Envi ronments . . . . . . . . . . . . . . . . . .    182
                         (4)  Application .@ . . . . . . . . . . . . . . . . . . . . . .    185
                    b.   Energy Facility Construction  . . . . . . . . . . . . . . . . .    186
                         (1) Natural Environment   . . . . . . . . . . . . . . . . . . .    186
                         (2) Cultural Environment    . . . . . . . . . .. . . . . . . . .   189
                    C.   Operating Impacts   . . . . . . . . . . . . . . . . . . . . . .    202
                         (1) 'Fossil Fuel (Coal) Power.Plants   . . . . . . . . . . . . .   204
                         (2)  Nuclear Power Plants   . . . . . . . . . . . . . . . . . .    219
                         (3)''Coal Transshipment and Storage    . . . . . . . . . . . . .   232
                         (4)  Oil Transshipment and Storage  . . . . . . . . . . . . . .    235
                         (5)  Refineries   . . . . . . . . . . . . . . . . . . . . . . .    238
                5.  Facil ity Cost Analysis  . . . . ... . . . . . . . . . . . . . . . .    242
                    a.   Introduction . . . . . . . . . . . . . . . . . . . . . . . . .     242-
                    b.   Fossil Fuel (Coal) Power Plants   . . . . . . . . . . . . . . .    242
                         (1)  Fuel Transportation and  Storage  . . . . . . . . . . . . .   242
                         (2)  Cooling Systems  . . . . . . . . . . . . . . . . . . . . .    251
                         (3)  Electrical Transmission  System   . . . . . . . . . . . . .   258
                         (4)  Land   . . . . . . . . . . . . . . . . . . . . . . . . . .    259
                         5)   Environmental Controls   . . . . . . . . . . . . . . . . .    262
<pb n="7" />

                                                      vii

                                     Table of Contents    (Continued)

                                                                                                   Page
                     c. Nuclear Power Plants                                                       266

                          (1)  Fuel Transportation and Storage                                     266
                          (2)  Cooling Systems    . . . . . . . . . . . . . . . . . . . . .        267
                          (3)  Electrical Transmission Systems                                     269
                          (4)  Land   . . . . . . . . . . . . . . . . . . . . . . . . . .          271
                          (5)  Environmental Controls      . . . . . . . . . . . . . . . . .       271
                     d.   Fuel Transshipment and Storage                                           272
                          (1)  Introduction    . . . . . . . . . . . . . . . . . . . . . .         272
                          (2)  Land   . . . . . . . . . . . . . . . . . . . . . . .. . . .         272
                     e. Refineries    . . . . . . . . . . . . . . . . . . . . . . . . . .          272
                     f. Facility Cost Discussion                                                   273
                     Discussion of Coastal Dependence and Case Study         . . . . . . . . .     279
                7. Conclusions and Implications for Policy Options           . . . . .             291
           B. Energy Consumption and Movement in the Great Lakes           Region   . . . . . .    294
                1. Introduction     . . . . . . . . . . . . . . . . .. . . . . . . . . . .         294
                2. Energy Demand      . . ... . . . . . . . . . . . . . ... . . . . . . .          294
                     a. Fuels for Power Production       . . . . . . . . . . . . . . . . . .       294

                          (1)  Origin of Fuels    . . . . . . . . . . . . . . . .. . . . . .       295
                          (2)  Great Lakes States Production and Reserves         . . . . . . .    299

                          (3)  Present Fuel Mix     . . . . . . . . . . . . . . . . . . . .        304
                          (4)  Cost and Use by State and Region       . . . . . . . . . . . .      307
                          (5)  Transport of Fuels for Power Production       . . . . . . . . .     308
                     b. Electricity     . . . . . . . . . . . . . . . . . . . . . . . . .          314
                          (1)  Power  . . . . . . . . . . . . . . . . . . . . . . . . . .          314
                          (2)  Population    . . ... . . . . . . . . . . . . . . . .       . . .   317
                          (3)  Power Flows in the Coastal Zone      . . . . . . . . . . . . .      319

                3. Existing    Facilities of Energy Supply      . . . . . . . . . . . . . . .      322

                     a.   Electrical Generation     . . . . . . . . . . . . . . . . . . . .        322
                          (1)  Types by State and Region     . . . . . . . . . . . . . . . .       322
                          (2)  Electrical Transmission     . . . . . . . . . . . . . . . . .       324

                     b.   Fuel Transshipment and Storage     . ... . . . . . . .                   326
                          (1)  Facility Type and Size      . . . . . . . . . . . . . . . . .       326
                          (2)  Capacity    . . . . . . . . . . . . . . ... . . . . .. . . .        332
                          (3)  Demand    . . . . . . . . . . . . . . . . . . . . . . . . .         335
<pb n="8" />

                                                       Vill

                                       Table of Contents (Continued)

                                                                                                  Page
                            (4)  Origins and Destinations of Fuels Handled      . . . . . . . .   340
                            (5) Planned or Scheduled Facilities      . . . . . . . . . . . . .    342

                        c. Refineries   . . . . . . . . . . . . . . . . . . . . . . . . . .       346

                   4.   Planned or Scheduled Facilities for Electrical Generation                 350

                        a. Types.by State and Region      . . . . . . . . . . . . . . . . . .     350
                        b. Estimated Capacity Projected Demand       . . . . . . . . . . . . .    354
                        c. Implications of Emerging Technologies       . . . . . . . . . . . .    357

           V. REGIONAL SCENARIOS OF ENERGY DEVELOPMENT      . . . . . . . . . . . . . . . . .     361

               A.  Introduction to Scenario Approach      . . . . . . . . . . . . . . . . . .     361
               B.  Description and Determin  ants of Scenarios    . . . . . . . . . . . . . .     363
                   1. Scenario I - Recent Trends     . . . . . . . . ... . . . . . . . . . .      363
                   2. Scenario II      High Coal Electric   . . . . . . . . . . . . . . . . .     366
                   3. Scenario III      High Nuclear Electric   . . . . . . . . . . . . . . .     367
                   4. Scenario IV      Applied Emergi ng Technologies                             367
               C.  Introduction to Demand Projections     . . . . . . . . . . . . . ... . . .     369
               D.  Review of Past Projections    . . . . . . . . . . . . . . . . . . . . . .      371
                   1. Overviews of Available Projections      . . . . . . . . . . . . . . . .     371
                   2. Analysis of Selected Projections      . . . . . . . . . . . . . . . . .     374
                   3. Selected Growth.Rates for Projections       . . . . . . . . . . . . . . .   376
               E., Implications of Scenarios     . . . . . . . . . . . . . . . . . . . . . .      377
               F.  Projected Generating Capacity and Resource     Requirements    . . . . . . .   379
               G.  Coastal Zone Resource Impact Analysis   . . . . . . . . . . . . . . . . .      384
                   1. Relation of Projected Electrical Demand to Power Plants         . . . . .   384
                   2. Relation of Projected Electrical and Fuel Demands to                        387
                        Fuel Transshipment and Storage    . . . . . . . . . . . . . . . . . .

         VI. POLICY OPTIONS RELATED TO THE SITING OF ENERGY FACILITIES IN        THE  GREAT
               LAKES COASTAL ZONE   . . . . . . . . . . . . . . . . . . . . . . . . . . . .       391
               A,  Introduction                                                                   391
               B.  Institutional Options     . . . . . . . . . . . . . ... . . . . . . . . .      393
                   1.   Introduction  . . . . . . . . . . . . . . . . . . . . . . . . . . .       393
                   2.   Siting Policy   . . . . . . . . . . . . . . . . . . . . . . . . . .       393
                   3.   Organizational Structure and Arrangements      . . . . . .                397
                   4.   Functional Responsibilities    . . . . . . . . . . . . . . . . . . .      401
                   5.   Siting Procedures   . . . . . . . . . . . . . . . . . . . . . . . .       406
                   6.   Siting Criteria and Standards     . . . . . . . . . . . . . . . . . .     409
<pb n="9" />

                                                         ix

                                         Table of Contents (Continued)

                                                                                                       Page
                    7. Financial Mechanisms      . . . . . . . . . . . . . . . . . . . . . . .          414
                    8. Intergovernmental Relations         . . . . . . . . . . . . . . . . . . .        418
               C.   Technical Options     . . . . . . . . . . . . . . . . . . . . . . . . . .           424
                    1.   Framework    . . . . . . . . . . . . . . . . . . . . . . . . . . . .           424
                    2.   Description of Options     . . . . . . . . . . . . . . ... . . .. . . .        425
                         a.  Exclusion of All New Facility Development from the Coastal
                             Zone Management Area Including Access to Coastal Waters
                             and Related Fuel Transshipment       . . . . . . . . . . . . . . . .       425
                         b.  Exclusion of All New Facility Development from the Coastal
                             Zone Management Area, but Allowing Coastal Water Access,
                             Related Fuel Transportation, and Product Transmission
                             Through the Coastal Zone     . . . . . . . . . . . . . . . . . . .         428
                         C.  Inclusion of New Facility Development in the Coastal Zone
                             Management Area, Except in Designated Sensitive Areas in
                             Which Additional Development Would Be Precluded          . . . . . . .     434
               D. Summary      . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .            443

        VII. SUMMARY AND CONCLUSIONS         . . . . . . . . . . . . . . . . . . . . . . . . .          445

               A. Institutional Considerations        . . . . . . . ... . . . . . . . . . . . .         445
               B.   Technical Considerations     . . . . . . . .. . . . . . . . . . . . . . . .         446
                    1.   Facilities Siting and Coastal Dependence       . .... . . . . . . . . . .      446
                    2.   Energy Consumption and Movement       . . . . . . . . . . . . . . . . .        448
                    3.   Regional Scenarios of Energy Development       . . . . . . .... . . . . .      449
                    4.   Other Considerations    . . . . . . . . . . . . . . . . . . . . . . .          452

               C.   Policy Options    . . . . . . . . . . . . . . . .. . . . . . . . . . . . .          453
               D.   Implications for,Further Research        . . . . . . . . . . . . . . . . . .        453

               APPENDICES   . . . . . . . . . . . . . . . . . . . . ... . . . . . . . . . .             459

               A.   Standing Committee    on Coastal Zone Management       . . . . . . . . . . . .      459
               B.   CZM Energy Project    Steering Committee      . . . . . . . . . . . . . . . .       461
               C.   CZM Energy Project    Technical Advisors..    .     . . . . . . . . . . . . .       462
               D.   CZM Energy Project    Citizen Advisors     . . . . . . . . . . . . .     . . . .    466
               E    CZM Energy Project    Staff  . . . . . . . . . . . . . . . . . . . . . . .          467
               F.   Summary of Air Quality Effects of S02, Particulates, and N02           .. . . . .   468
               G.   Electric Generating Facilities in the Coastal Counties of the
                    Great Lakes    . . . . . . .   o  . . . . . . . . . . . . . . . . . . . . .         472

               ACRONYMS   . . . . . . . . . . . . . . . . . .         . . . . . . . . . . . . . .       475

               GLOSSARY   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ...             477

               REFERENCES   . . . . . . . . . . . . . . . . . .         . . . . . . . . . . . . .       481
<pb n="10" />

                                                        xi

                                                LIST  OF TABLES

          Table                                                                                       Page

                 National Ambient Air Quality Standards                                                 46
             2   Allowable Increments of Air Quality Deterioration          . . . . . . . . . . .       48
            .3   Major Permits Required for Power Plant Siting in Illinois                              64
             4   Major Permits Required for Power Plant Siting in Michigan                              68
             5   Major Permits Required for Power Plant Siting in Ohio                                  84
            .6   1Major Permits Required for Power Plant Siting in Pennsylvania                         87
             7   Features of State Energy Facility Siting        Programs   . . . . . . . . . . .      108
             8   Cooling Water Evaporation Losses      . . . . . .  /. . . . . . . . . . . . . .       132
             9   Status, Number, and Capacity of Flue Gas        Desulfurization   Systems   in the
                 United States  . ... . . . . . . . . . . . . . . . . . . . . . . . .        I . . .   142
            10   Cooling System Land'Requirements      . . . . . . . . . . . . . . . . . . . .         148
            11   Required Cooling Water Flow Rates Across Condenser         . . . . . . . . . . .      149'
            12   Nuclear Power Plant Consumptive Water Use       . . . . . . . . . . . . . . . .       150
            13   Flows of Major Plant Systems      . . . . . . . . . . . . . . . . . .                 152
            14   Expected Fuel and Waste Shipments for Fermi 2                                         .153
            15   Refinery Land Requirement (Acres)                                                     169
            16   Refinery Cooling Water Requirements        . . . . . . . . . . . . . . . . . .        171
            17   Potential Environmental,Impicts Resulting        from Construction Practices.         188
            18   Work Force Profile: Nuclear Power Plants
                                                                                                       190
            19   Work Force Profile: Fossil Fuel (Coal) Power Plants          . . . . . . . . . .      190
            20   Work Force Profile: Refineries                                                        191
            21   Work Force Profile: Fuel Transshipment Facilities                                     191
            22   Tax Payments During Construction of the Jim Bridger Power Plant             . . . .   201
            23   Construction Impact Summary    . . . . . . . .                                        203
            24   Summary of Fuel Cycle Impacts       . . . . . . . . . . . . . . . . . . . . .         205
            25   Summary of Coal-Fired Power Plant Air 'Emissions         . . . . . . . . . . . .      207
            26   Trace Element Emissions of a Coal-Fired Power Plant (1000 MWe)                        208
            27   Annual Liquid Effluent Activity for a 1000 MWe Reactor                                223
            28   Estimated Annual Radgas Effluents from a 1000 M4e.Reactor                             226
            29   Maximum Estimated Whole Body Dose at Site Boundary for a 1000 Mwe Plant.              229
            30   Estimated Refinery Air Emissions                                                      239
            31   Estimated Waterborne Effluent Concentrations                                          240
<pb n="11" />

                                                         xii

                                             List of Tables (Continued)

                Table                                                                           Page

                  32   Miscellaneous Cost Comparisons     . . . . . . . . . . . . . . . . . .    243

                  33   Costs of Coal Transportation     . . . . . . . . . . . . . . . . . . .    246
                  34   Transportation Costs Per Ton of Delivered Coal      . . . . . . . . . .   247
                  35   Short Haul Coal Transportation Costs     . . . . . . . . . . . . . . .    250
                  36   Cooling System Efficiencies for 800 MWe Coal-Fired Plants         . . . . 252
                  37   Estimated Costs of Two-Unit (1300 MWe Each) Coal-Fired Plant with
                       Alternative Cooling Systems    . . . . . . . . . . . . . . . . . . . .    252
                  38   Comparison of Costs   and Effects on Net Capability for 1200-We
                       Nuclear Generating Unit     . . . . . . . . . . . . . . . . . . . . .     254

                  39   Operation Costs for Water Conveyance by Pipeline, by Distance,
                       and by Type of Facility -for a 1000 MWe Plant     . ... . . . . . . . .   255
                  .40  Capital Costs of Water Pipelines for Cooling Water Supply         . . . . 256
                  41   Cost of Providing Water to Coal-Fired Power Plant with 12.00 MWe
                       Capacity Sited Two Miles Inland    . . . . . . . . . .     . . . . . . .  257
                  42   Costs and Power Carrying Capabilities of Overhead        Transmission
                       Circuits   . . . . . . . .. . . . . . . . . . . . . . . . . . . . . .     260

                  43   Summary of Total Average.Annual Revenue Requirements of Five
                       Leading Flue Gas Desulfurization Processes      . . . . . ... . . . . .   263
                  44   Annual Shipments of Radioactive Materials to and from an Offshore
                       Nuclear Power Station (One 1100 MWe PWR)      . . .. . . . . . . . . . .  267
                  45   Cooling Mode Effects on Nuclear Plant Efficiency         . . . . . . . .  268
                  46   Cooling Mode Effects on Fossil/Nuclear Plant Operation       . . . . . .  268
                       Estimated Costs of Two-Unit (1300 MWe Each) LWR Power Plant with
                       Alternative Cooling Systems    . . . . . . . . .I . . . . . . . . . . .   269
                  48   Comparison of Costs and Effects on Net Capability for 1200 Mwe
                       Nuclear Generating Unit Using Alternative Cooling Systems         . . . . 270
                  @49  Cost of Supplying Refined Products to the East Coast from Onshore
                       and Offshore Refineries   . . . . . . . . . . . . . . . . . . . . . .     274

                  50   Facility-Cost Matrix    . . . . . . . . . . . . . . . . . . . . . . .     275
                  51   Origin and Destination of Coal Deliveries to Electric Utilities
                       in 1975 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .       296

                  52   Primary Energy Purchase Data for Steam-Electric Plants       During the
                       Past Twelve Months of 1975     . . . . . . . . . . . . . . . . . . . .    305
                  53   1975 Fuel Mix by Fuel Type for Power Generation        . . . . . . . . .  307
                  54   Steam-Electric Fuel Figures      . . . . . . . . . . . . . . . . . . .    309
                  55   U.S. Distribution of Energy Consumption by Fuel and by Sector        . . .315
                  56   Contribution of Each Fuel to the Utility Sector        . . . . . . . . .  316
<pb n="12" />

                                                       xiii

                                          List of Tables (Continued),

            Table                                                                              Page
              57    Per Capita Power Generation   . . . . . . . . . .. . . . . . . . . . .     317
              58    Total and Per Capita Energy Consumption     .. . . . . . . . . . . . .     317
              59    Great Lakes States Population-by Coastal Zone       . . . . . . . . . .    318
              60    Power Generation by State   . . . . . . ... . . . . . . . . . . . . .      323
              61    Major Coal Shipping or Receiving Ports, 1974      . . . . . . . . . . .    329
              62    Major Petroleum Shipping or Receiving Ports,      1974  . . . . . . . .    331
              63    Potential GL/SLS Coal Movements   . . . . . . . . . . . . . . . . . .      337
              64    Projections of U.S. Great Lakes Shipments of      Coal  . . . . . . . .    338
              65    Trend Projections of Great Lakes and St. Lawrence Seaway Shipments
                    of Crude, Petroleum and Selected Petroleum (1975-1985)       . . . . . .   @339
              66    Bituminous Coal Shipments to U.S. and Canada from Lake Erie       . . . .  340
              67    Fuel Type, Origin and'Transportation for Fossil-Fuel Facilities
                    Scheduled Through 1985   . . . . . . . .. . . . . . . . . . . ... . ..     345

              68    Barrels  of Crude Oil Refined in Each Great Lakes     State  . ... . . .   347

              69    Changes  in Nuclear Unit Schedules During 1972-1975     . . . . . . . .    354
              70    Planned  or.Scheduled Additions in Generating Capacity in the
                    Coastal  Zone, 1976  . .. . . . . . . . . . . . . . . . . . . . . . .      359
              71    Planned  and Scheduled Additions in Generating Capacity in the
                    Great Lakes Region   . . . . . . . . . . . . . . . . . . . . . . . .       360
              72    Major Assumptions-for Base Load Generation for the.Regional
                    Scenarios . . . . . . . . . . . . . . . . . . . . . . . . . . . . .        364
              73    Overview of Electric Power Projections     . . . . .                       372
              74    New Generating Capacity Requirements for 1995 (in MW)     . . . . . . .    379
              75    1975 Fuel-Mix by Fuel Typefor Power Generation        . . . . . . . . .    381
              76    Additional Facilities Required Between     1975-1995 for Scenario I,.
                    Recent Trends ... . . . . . . ... . . . . . . . . . . . . . . . . .        382

              77    Additional Facilities Required Between     1975-1995,for Scenario II,
                    High Coal Electric   . . . . . . . . . . . . . . . ... . . .               383
              78    Additional FacilitiesRequired Between      1975-1995 for Scenario III,
                    High Nuclear  . . . . . . . . . . . . . . . . . . . . . . . . . . .        384
              79    Additional Resource Requirements of the Great Lakes States, 1975-
                    1995; Scenarios at 3% Per Year Growth Rate in Electrical Energy
                    Consumption . . ... . . . . . . . . .    . . . . . . . . . . . . . . .     450
              80    Additional Resource Requirements of the Great.Lakes Coastal.
                    Counties, 1975-105, Assuming a 3% Grow'th Rate in Electrical
                    Energy Consumption                       . . . . . . . . . . . . . . .     451
<pb n="13" />

                                                      xv

                                             LIST OF FIGURES

           Figure                                                                                     Page
              A    Map: Great Lakes Basin Dra    inage Boundaries    . . . . . . . . . . . . . . .      23
              B    Map: Great Lakes Region Political Boundaries        . . . . . . . ... . . . .        24
                   Schematic of a Fossil Fuel (Coal) Power Plant          . . . . . . . . . . . .     124
              2    Cooling Water Requirements for Fossil and Nuclear Power Plants           . . . .   129
              .3   Alternative.Cooling System Configurations         . . . . . . . . . . . . . .      130
              4    Cross"Sectional Views of Three Cooling Devices         . . . . . . . . . . . .     131
              5    Schematic Diagram of a Combined Cycle Gas-Steam Generating Plant                   140
              6    Simplified Diagrams of Three Limestone/Lime Stack Gas Desulfurization
                    Techniques    . . . . . . . . . . . . . . . . . . . . . . . . . . . . .           141
              7    Boiling Water and Pressurized Water Reactor Power Plant Schematics                 144
              8    Definition of Exclusion Area, Low Population Zoneand Nearest,
                    Population Center    . . . . . . . . . . . . . . . . . . . . . . . . . .          143
              9    Fermi 2 (Detroit Edison) Water Use Syst      em.  . . . . . . . . . ... . . .      151
            10     Pathways of Radiation Through the Environment          . . . . . . . . . . . .     158
            11     High Temperature Gas Reactor      . . . . . . . . . . . . . . . . . . . . .        161
            12     Major Components of a Refinery      . . . . . . . . . . . . . . . . . . . .        168
                   Major National Product Pipeline System       . . . . . . . . . . . . . . . .       173
            14     Generalized Potential Commuting Zone       . . . . . . . . . . . . . . . . .       193
            15     Effect of a Major New Facility on the Local Tax Base         . . . . . I . . . .   199
            16     Diagramatic Summary of Coal-Fired Power Plant Environmental Impacts. .             206
            17     Fossil Fuel (Coal-Fired) Power Plant Matrix         . . . . . . . . . . . . .      218a
            18     Diagramatic Summary of Nuclear      Power Plant Environmental Impacts      . . .   220
            19     BWR Radgas Control System      . . . . . . . . . . . . . . . . . . . . . .         222
            20     BWR Liquid Waste System      . . ... . . . . . . . . . . . . . . . . . . .         224
            21     PWR Radgas Control System      . . . . . . . . . .. . . . . . . . .. . . . .       227
            22     Pathways of Radiation through the Environment          ... . ... . . . . . . .     228
            23     Nuclear Power Plant Assessment Matrix        . . . . . . . . . . . . . . . .       232a
            .24    Coal Transshipment Facility Assessment Matrix            . . . . . . . . . . .     234a
            25     Fate of Oil in tbeMarine Environment         . . . . . . . . . . . . . . . .       236
            26     Oil Transshipment Facility Assessment Matrix        . . . . . . . .. . . . . .     238a
            27     Refinery Assessment Matrix     . . . .. . . . . . . . . . . . . . . . . . .        240a
            28     Distribution of United States Coal Resources           . . . . . . . . . . . .     244
            29     Transmission Line Capacities     . . . . . . . ... . . . . . . . . .. . . .        261
            30     Pleasant-Prairie.Power Plant, Preliminary Plant Layout         . . . . . . . .     282
<pb n="14" />

                                                        xvi

                                        List of Figures (Continued)

            Figure                                                                           Page
              31     Proposed Intake/Discharge Corridor   . . . . . ... . . . . . . . . .    283

              32     Pleasant Prairie Power Plant, Alternative Site    Locations  . . . . .  284

              33     Examples of Great Lakes Shoreline Types    . . . . . . . . . . . . .    289
              34     Sources of Natural Gas Supply to the Great Lakes Basin States.          297
              35     Sources of Crude Oil Supply to.the Great Lakes BAsin.States      . . .  298
              36     Projections of U.S. Great Lakes Coal Shipments    . . . . . . . . . .   338
              37     Weekly Load Curve   . . . . . . . . . . . . . . . . . . . . . . . .     355
<pb n="15" />

                                                    xvii

                                                 PREFACE

                    This study, Energy Facili.ty Siting in the Great Lakes Coastal Zone:
            Analysis and Policy Options, can be  described as fact-finding and brainstorming
            in nature. It is fact-finding in that it surveys existing state and federal
            policies affecting.energy facilities siting,@' examines specific types of energy
            facilities and their dependence on coastal locations, and reviews projections of
            energy use and related facility requirements. For this portion of the report,
            tremendous amounts of information (over 150,000 pages of reports, documents and
            correspondence, as well as phone calls and interviews) were summarized and
            abstracted. The study is of a brainstorming nature in that the staff spent
            substantial time evolving institutional and technical options for the siting of
            energy.facilities,in the Great Lakes coastal zone..
                    The st udy was conducted by the Great Lakes Basin Commission  staff over a
            period of four months,.from July 6 through November 5, 1976. Guidance, sugges-
            tions, and review comments were provided throughout the study by the project's
            steering committee, technical advisors, and citizen  advisors, by state coastal
            zone program managers, and by the Office of Coastal  Zone Management. This
            assistance was gratefully received by the staff and was most important in helping
            the staff complete the study on time.
                    The draft report was reviewed by the project's steering committee,
            technical and citizen advisors, the state coastal zone management programs, and
            the Office.of Coastal Zone Management. The review period ran from November 10 to
            December 7, 1976. Comments received after the closing date.were,.also considered
            in the preparation of this final report.
                    In,the course of the review,,general comments criticized the report from
            two standpoints. First', some members of the energy industry indicated that the
            report is somewhat biased toward environmental'concerns, whereas some environ-
            mentalists suggested thatcertain portions-of the report are too biased   in favor
            of the energy industry. It.is the conclusion of the staff that the report takes
<pb n="16" />

                                                   xviii

            a middle ground that will serve the concerns of the state coastal zone manage-
            ment programs well as they develop management plans to balance environmental and

            economic considerations.

                     Second, some comments suggested that the report is too long and includes
            information accessible elsewhere. (This is, in part, related to the broad scope
            of the study.) On the other hand, a considerable number of comments indicated
            that the  report is very useful, because it synthesizes a tremendous amount of
            diverse but related information under one cover. The coastal zone management-
            programs, to which the report is directed, are probably best served by this
            latter approach since their own resources are limited.
                    While a broad group of technical advisors from both the public and
            private sectors-participated  in the study through their review of and comment on,
            preliminary material and the draft report, this should not be taken as an endorse-
            ment of this final report by them. They served only as    information providers,
            advisors, and reactors.
<pb n="17" />

                                                xix

                                          ACKNOWLEDGEMENTS

                   The Office of Coastal Zone Management, National Oceanic and Atmospheric
           Administration, U.S. Department of Commerce, funded the Great Lakes Basin Commis-
           sion to engage in this study on June 30, 1976, to provide assistance on a regional
           basis to aid the Great Lakes states' coastal zone management programs in the
           examination of energy facility siting and the development of related options.
           The Great Lakes Basin Commission and staff appreciated the opportunity to under-
           take this study for the Office of Coastal Zone Management and the eight Great

           Lakes states.

                   The staff received tremendous assistance from the Steering Committee and
           Technical Advisors of the study (listed in Appendices A.and B). Their efforts are
           greatly appreciated. These people represent agencies and companies involved at all
           levels of energy planning. The fact that the staff  was able to complete the study
           on time can in no small part be attributed to their efforts. In particular, the
                                                                     he Argonne and Brookhaven
           staff would like to acknowledge the expert assistance of t
           National Laboratories, the Chicago regional office of the Federal Power Commission,
           Mr. Owen Lentz, Executive Manager of the East Central Area Reliability Coordination
           Agreement, and Mr. Julius Bleiweis, Executive Director of the Northeast Power
           Coordinating Council.
<pb n="18" />

                                            Chapter I

                                        EXECUTIVE SUMMARY

                   Concerned about energy facility siting in the Great Lakes coastal zone
           and anticipating federal legislation to provide for planning of and amelioration
           of the impacts from energy facilities, the Great Lakes states coastal zone man-
           agement programs requested that the Great Lakes Basin Commission undertake this
           study of energy facility siting and develop related policy options. The study
           was funded by the Office of Coastal Zone Management, U.S. Department of Commerce,
           and was conducted from July 6 to November 5, 1976.
                   The study examined the state and federal roles in energy facility siting
           in orderto develop institutional and technical policy options which the Great
           Lakes states might employ to influence or control energy facility siting, pri-
           marily in their coastal zones. Coal-fired and nuclear power plants, fuel (coal
           and oil) transshipment and storage facilities, and refineries were described
           generally and their resource requirements examined. These resource requirements
           were then applied to four regional electrical energy facility scenarios to
           establish land, water, and fuel (coal) requirements for the period 1975-1995 for
           a range of annual electrical energy consumption growth rates from 3% to 8% for
           each of the Great Lakes states.and their respective tier of counties bordering
           the Great Lakes.. These projections suggested the possible pressures on the
           Great Lakes coastal zone for the development of energy facilities. This back-
           ground provided the impetus for developing technical options for energy facility
           siting.

           A. INSTITUTIONAL CONSIDERATIONS

                   Institutional consideration3 address the legal, organizational, and
<pb n="19" />

                                                   2

            procedural aspects of energy facility siting and are distinguished from technical
            considerations. The analysis of institutional considerations provides a means
            for comparing and evaluating state energy facility siting programs and describes
            the federal role and the constraints it imposes on the states and the opportu-

            nities it provides.

                1. FEDERAL ENERGY FACILITY STTING REGULATION
                    Several federal agencies exert a considerable amount of influence on
            energy facility siting. The Nuclear Regulatory Commission has licensing authority
            for nuclear power plants. The Federal Power Commission regulates the siting of
            non-federal hydroelectric power plants (including dams and pumped storage facil-
            ities) and the interstate sale of ele-ctricity and natural gas. The Environmental
            Protection Agency exerts a great deal of influence on energy facility siting by
            administering two federal acts. The Clean Air Act (CAA) established National
            Ambient Air Quality.Standards (NAAQS) and performance standards for new sta-
            tionary sources of pollution. These must be met by all energy facilities. The
            CAA also provides for the prevention of significant deterioration of air quality
            .that exceeds the NAAQS. The Federal Water Pollution Control Act Amendments of
            1972 provide for the regulation of water pollution from various sources, including
            energy facilities. In particular, regulations governing thermal di@charges,
            cooling water intake structures, and certain chemical constituents are signifi-
            cant in energy facility siting,decisions. The U.S. Coast Guard and the U.S.
            Army Corps of Engineers are concerned with dischargeg and physical obstructions
            to waterways, and the Federal Aviation Administration is concerned with similar
            infringements upon air traffic routes.
                    Two federal laws also affect energy facility siting: the National-
            Environmental Policy Act of 1969 (NEPA), and the Coastal Zone Management Act of
            1972 (CZMA) and its Amendments of 1976. The CZMA encourages states to develop
            plans for managing their coastal zones and provides funding for such planning
            and subsequent management. State plans, once approved, become formal documents
            requiring enforcement by the state, and all federal actions affecting the
            coastal zone must be consistent with these plans. In particular, the Great Lakes
            states, under the 1976 amendments, must develop a planning process for energy
            facilities located in or significantly affecting the coastal zone, and are
            eligible for grants to study and plan for any economic, social, or environmental
            consequences resulting from siting, construction, expansion, or operation ofall
<pb n="20" />

                                                   3

           types of energy facilities in or affecting the coastal zone. The states are also
           eligible for grants to assist them in preventing, reducing, or ameliorating the
           loss of valuable environmental or recreational resources resulting from the
           transportation, transfer, or storage of oil, natural gas, or coal in or through

           the coastal zone. The inclusion of these elements in the.Great Lakes states

           coastal zone management programs provides the basis for energy facility siting
           programs for the Great Lakes coastal zone. This is particularly significant for
           the states that have not already established energy facility siting programs on
           a statewide basis. In recognition of the different-institutional arrangements
           in each state, the Act provides latitude for the organization of the coastal'
           zone energy facility planning process in each state. The National Environmental
           Policy Act requires environmental impact statements for all major federal activ-
           ities (including issuance of licenses and permits) that significantly affect the
           environment. This promotes the environmental compatibility of all energy facility
           siting, both within -and outside the coastal zone.

               2. STATE ENERGY FACILITY SITING REGULATION

                   Of the eight Great Lakes states, New York, Ohio,   Wisconsin and Minnesota
           have recently enacted legislation to regulate the siting   of power plants and
           other energy facilities. Minnesota has placed siting responsibility with its
           Environmental Quality Council. The council has established.criteria for.the
           selection of suitable sites and is compiling an inventory of specific sites   from
           which utilities may select. The Wisconsin statute serves to streamline the site
           certification process by concentrating responsibility for the various aspects of
           siting in the Department of Natural Resources and the Public Utilities Commission.
           Both New York and Ohio have established energy facility siting councils composed
           of the heads of several pertinent state agencies. All four states have established
           site certification application procedures and provide for the public disclosure
           of long-range utility plans, for public participation inthe siting.process and
           for mechanisms to finance the regulation of energy facility siting. However,
           none of these states address all types of energy facilities in their siting pro-
           grams. The facilities that are.not addressed in the siting programs are covered
           by applicable environmental protection programs.
                   The remaining four.states (Illinois, Indiana, Michigan and Pennsylvania)
           rZ@ly on general programs for environmental protection, and public utility regula-
           tion for any control they exercise over facility siting. These states generally
<pb n="21" />

                                                      4

              require that a utility obtain several permits from various state agencies.
              Emphasis in these states is on compliance of proposed energy facilities with
              applicable standards afid guidelines for protection of air, water, and other
              resources. In general, the larger range of siting issues are not addressed in
              a comprehensive, coordinated manner. There are no provisions for the disclosure
              of long-range utility plans in these states, and opportunities for public par-
              ticipation are generally less than in the other four states.
                       Several coastal states outside the Great Lakes Region (Maine, Maryland,
              Massachusetts, Washington, Oregon, and California) were selected for investiga-
              tion in this study because of their unique energy facility siting programs. The
              approaches used in these states include: regulation of any large land develop-
              ment project, maintenance of state-purchased energy facility land reserve,
              inclusion of all types of energy facilities in a siting program, and active
              encouragement of public participation in the siting process.
                       State officials And other interested persons are encouraged to carefully
              compare  and evaluate the various state energy facility siting programs and the
              ways in  which CZM considerations are incorporated. The following criteria are
              suggested by the staff, based on the review of extensive information concerning
              energy facility siting, for use in such an evaluation:
                       e The program should provide for the resolution of conflifts among

              intere sts and the identification of tradeoffs.

                       a . Theprogram. should be accountable to the public and responsive to
              its needs and desires.

                       *   The program should include an effective planning mechanism.
                       *   The program should be coordinated with other energy and land use

              programs.
                       0   Energy facility siting should provide tor regional needs.
                      :0,  The program should specifically address the protection of the
              environment, Iespecially in the coastal zone.
                       0   The program should facilitate provision of an adequate supply of

              energy.
                       0   The program should be assured adequate funding and staffing.
                       0   'rhe program should be tlexible and adaptable.
                       0   The program should be politically feasible.
                       0   The program should be as streamlined as possible.
<pb n="22" />

                                                   5

           B. TECHNICAL CONSIDERATIONS

               1. ENVIRONMENTAL AND ECONOMIC FACTORS AFFECTING THEBITING      OF ENERGY
                   FACILITIES

                   Technical considerations--social, economic, and environmental-'and their
           relationship to energy facility siting are reported in detail in the study. The
           facilitiesexamined include fossil-fuel (coal-fired only) and nuclear power
           plants, fuel (coal and oil) transshipment and storage facilities, and refineries.
           General siting considerations affecting the location of these facilities include,
           system planning, safety and reliability, engineering, environmental, institutional/
           regulatory, and economic. A   generalized facility size was established for each
           facility type in order to present comparable resource requirements of the facil-
           ities. For both fossil-fuel (coal) and nuclear power plants, a 1,000 megawatt
           electrical output (MWe) capacity single unit plant was selected as the generalized
           facility. The efficiency and annual average capacity assumed for these two types
           of facilities are 38 percent and 65 percent respectively for fossil-fuel plants,
           and 32 percent and 65 percent respectively'for nuclear plants. Refineries are
           not described in "generalized facility" terms because oftheir complex production
           systems reflecting particular product mixes. Fuel transsliipment and storage
           facilities do not lend themselves to a generalized description because of their
           range in size and uses.
                   The generalized 1,000 MWe coal-fired power plant is assumed in this study
           to occupy from 145 to 2,500 acres, depending on the cooling system used, SO
                                                                                         x
           waste disposal method, and coal storage requirements. An average      land.require-
           ment used for calculating future resource requirements.is 525 acres. Water
           withdrawals can range from 9,300 gpm (21 cfsj to 800,000 gpm (1800"cfs), depending
           on the cooling system used: once-through, natural draft tower, mechanical draft
           tower, spray canal, or cooling pond.
                   Water consumed in the cooling process is also a major consideration in
           power plant location because the amount of water returned to a water body may be
           significantly less than the amount withdrawn, depending on the cooling system
           used. Generally, for a once-through cooling system, water withdrawal is larger
           (equaling the flow across the condenser), but the consumptive water use'is much
           less than for closed-cycle systems.
                   For the generalized nuclear power plant,   1,335 acres is the average land
           area required. This figure,is much higher than that for coal-fired plants,
           due in part to the requirement for an exclusion zone around the plant for the
<pb n="23" />

                                                     6

             protection of people and property from potential radioactive@@ emissions. Nuclear
             power plants require significantly more water than do similar sized fossil-fuel
             plants, due primarily to differences in thermal efficiency. A lower bound of
             13,500 to 18,000 gpm (30 to 40 cfs) withdrawal rate with a consumptive use rate
             of about 11,225 gpm (25 cfs) is not unreasonable for an efficient closed-cycle
             system of 1000-MWe nuclear unit. A withdrawal rate of one million gpm (2230 cfs)
             for'a once-through system with no significant consumptive loss provides an upper
             bo und (assuming 150F temperature rise across the condenser). Even if closed-
             cycle cooling were used for a nuclear or coal-fired plant of the generalized
             size (or larger), there are few river locations in the Great Lakes Basin which
             could provide a sufficient amount of water, given other environmental constraints.
             Thus, the water source for these facilities would have to be the Great Lakes.

                     Other major factors affecting power plant siting include: location with
             respect to population (important due to transmission line costs-, and aesthetics,
             and for nuclear plants, due to safety and radiological considerations), transpor-
                    access, seismology and geology (particularly important for nuclear plants),
             hydrology, meteorology, ambient air quality (particularly important for fossil
             fuel plants), minimization of aquatic and terrestrial ecosystem impacts, and
             public acceptance. Additional construction and operation effects and activities
             of importance are described in the report (Chapter IV, Technical Considerations---
             Environmental and Economic Impact Analysis).
                     The evaluation and determination of an energy facility's coastal depend-
             ence or non-dependence must be conducted on a case-by-case basis to determine the

             importance of a shoreline location for a given proposed energy facility. For a
             power plant., a@large number of considerations must be evaluated, including, but
             not limited to: land ownership, mode of fuel delivery, local meteorology and
             dispersion patterns, aesthetics, potential land use conflicts, and transmission
             line tie-in ability.
                     The coastal dependence of power plants can be summarized as follows:
                   :,* Facilities using once-through cooling must'be located on    or near the
             shoreline-because of substantial costs of transporting water inland   by pipeline.
                     * Facilities using closed-cycle cooling (while drawing water from the
             Great takes) are less dependent on locations on or near the shoreline than are
             facilities using once-through cooling, assuming all other factors to be approxi-
             mately equal. Site conditions will determine the type of closqd-cycle cooling
             system used. However, the further inland a facility is located, the greater are
<pb n="24" />

                                                   7

           the construction (capital) costs for water provision and blowdown pipelines.
                   e For facilities using closed-cycle cooling, the cost of locating on
           the shoreline versus the cost of locating inland are essentially trade-offs
           between construction and operation costs for transmission lines, facilities for
           watersupply and cooling, facilities for delivery and handling of fuels and other
           supplies, and disposal of waste material.
                      Nuclear facilities require very large  and massive components, which
           in most cases rely on water access for delivery. However, rail or road corridors
           of adequate width and load carrying capacity can be utilized for delivery Of
           these components. If these rail or road corridors are not available to potential
           inland sites, the location of nuclear facilities may be more dependent on shore-@-
           line or near shoreline locations. In any event, field assembly is.becoming more
           common, thus possibly negating some of this shoreline-water access dependence.
           Otherwise, nuclear facility coastal dependence considerations would be those
           listed in the previous item.
                   The coastal dependence of fuel transshipment and storage facilities and

           refineries can be summarized as follows:
                   e Fuel (coal and oil) transshipment facilities (receiving or shipping
           their commodities by water) must.locate near the shoreline,- althrough the related
           storage areas do not have to be located on the shoreline. Storage area location
           is highly dependent on industrial needs, future transportation requirements, and

           onsite and offsite use of stored fuel.

                   e Refineries are not coastal dependent, but do need access to water for
           processing and cooling. Refinery siting dependence based on water supply and
           wastewater disposal considerations is decreasing due to increasing water recycling
           practices. Air cooling is also decreasing refinery dependence on easy water
           access. Refinery location decisions are increasingly becoming market oriented,
           with decisions being made on a national basis, due to the existence of the national
           product distribution pipeline.
                   Coal gasification and liquefaction facilities are not likely to be located
           in the Great Lakes Basin, with the possible exception of low-Btu gasification
           facilities which can be located at or near the site of use. Large goal gasifi-
           cation and liquefaction facilities will have mine-mouth locations due to the
           higher cost of transporting coal relative to the cost of transporting substitute
           or synthetic natural gas (SNG).
<pb n="25" />

                                                   8

               2. ENERGY CONSUMPTION AND MOVEMENT

                    The Great Lakes Basin and states are net importers of fuels. It is
            difficult-to determine whether the Basin is a net importer or exporter of elec-
            tricity since this depends on temporal factors. It appears  however that the
            coastal counties in'most states (except Illinois) are net exporters of electricity.
            Furthermore, significant intra-coastal county electrical flows occur, particularly
            in areas around Milwaukee, Detroit, Toledo,,and Cleveland.
                    The combined planned and scheduled electrical energy generating capacity
            for the entire Great Lakes states area through the mid 1980's is 74,067 MWe, with
            19,433 MWe--or 23 new plants or plant additions--to be located in the Great Lakes
            coastal counties,in the states of New York, Ohio, Michigan, Indiana, and Wisconsin.
            New generating capacity is not planned or scheduled-to be in service by 1984 in
            the coastal counties of Illinois, Minnesota or Pennsylvania. (A state-by-state
            analysis is presented in Chapter VI, Technical Considerations--Energy Consumption
            and Movement in the Great Lakes Region.) Of this 19,433 MWe of additional capac-
            ity by the mid-1980's, 28 percent will be coal-fired (Michigan, New York and
            Wisconsin), 12% will be oil-fired (Michigan and New York), and 60% will be nuclear
            (Michigan, New York, Ohio, and Indiana).
                    Regional scenarios of energy development (principally electrical energy
            generation) have been prepared. The scenarios are based on different fuel mix
            assumptions due to the present uncertain conditions. The four scenarios with
            their respective fuel mix assumptions are:
                      Recent trends--50% coal, 35% nuclear, 15% oil, gas and hydroelectric
                      High Coal--70/lo coal, 15% nuclear, 15% oil, gas, and hydroelectric
                      High Nuclea,r--45% coal, 45% nuclear, 10% oil, gas, and hydroelectric
                    a New Technologies--40-50% coal, 20-35% nuclear, 15-20% new technologies
            (solar, wind, fluidized bed, etc.).
                    In developing regional resource requirements for land, water, and fuel,
            (coal), these scenarios were applied to a range of electrical,energy demand,pro-
            jections (3%/year, 5.5%/year, and 8%/year), an assumed mix of generating facilities
            (75% base load, 20% intermediate load, and 5% peak load), and an assumed capac-
            ity load factor .(65%). The resource requirements of the generalized facilities
            (coal-fired and nuclear power plants) were then applied to these assumptions to
            evolve the regional resource requirements of energy development.
                    For the purposes of this study a 3 percent growth rate per year in
            electrical energy consumption was assumed to be a lower bound in projecting future
<pb n="26" />

                                                      9

           power plant  development given uncertain circumstances. Actual growth in the
           future may be considerably higher or somewhat lower. This 3% growth rate will
           describe the minimum amount,of resources required to meet future electrical energy
           consumption, as shown in the following.table:

               ADDITIONAL RESOURCE REQUIREMENTS    OF THE GREAT LAKES STATES, 1975-1995
                                 SCENARIOS AT 3%/YEAR GROWTH RATE IN
                                    ELECTRICAL ENERGY CONSUMPTION

                          Additional                                Scenarios
                        Requirements
                          (1975-1995)                   1              11

            Nuclear (units)                             70            24             104
               land (acres)                           46,725        16,020         69,420
               water (gpd)
                 once- through                      1,008 x 10 8    346 x   108 1,498 x 10 8
                 closed-cycle                       1,512 x 10 6    518 x   106 2,246 x 10 6
             Coal (units)                               40            96               12
               land (acres)                          16,000         38,400          .4,800
               fuel (millions of tons per year)         80          192                24
               water @(gpd)
                                                               8             8             8'
                 orice-through                        403 x   10    963  x 10     121  x 10
                 closed-cycle                         576 x   10 6'  1,382 x 106   173 x 106

           The requirements   in Scenario IV, New Technologies, are     assumed to  be about 80% of
           those in Scenario I, Recent Trends, due to a postulated       reduced dependence  on more
           conventional generation technologies.
                    Assuming an 8'10/year growth rate, Scenario   I, Recent'Trends, projectsi@an
           additional 238 nuclear units and 185 coal units needed, with land requirements
                                                                 8
           of 233,000  acres; water withdrawals of 5,292 x 10 gpd for once-through cooling
                          6
          ''or 7,805 x 10   gpd for   closed-cycle cooling; and coal requirements of 370 million

           tons per year.
                    For the Great Lakes coastal    counties, the following general projected
           resource requirements,(Assuming.a 50% coal/50% nuclear mix for additional capac-
           ity between 1975 and 1995---an approximate average of the four scenarios) were
           developed on the basis of an analysis of the scenarios and each state's energy
           development:
<pb n="27" />

                                                         10

                          ADDITIONAL RESOURCE REQUIREMENTS OF THE GREAT LAKES
                                       COASTAL COUNTIES, 1975-1995,
                      ASSUMING A 3% GROWTH'RATE IN ELECTRICAL ENERGY CONSUMPTION

                                                    Additional Requirements
                                      Generating                          Water                 Coal
                        Generating      Capacity      Land        Withdrawals   (gpm)       (Millions of
              State       Units*           (MWe)    (Acres)       Once-        Closed     Tons@per year)
                                                                 Through        Cycle

            Illinois                                  ---         ---            ---

            Indiana          ---           ---        ---         ---            ---              ---
            Michigan          11           11,000    5,870    9.3.5xlO6         137,500           11.0
            Minnesota         1-2        1-2,000    1-2,000   0.9-1.7xlO  6  12-25,000.         2-4.0
                                                                      6
            New York          7            7,000      3,740   5.95xlO            87,500           7.0
            Ohio              4            4,000      2,135   3.4xlO 6           50,000           4.0

            Pennsylvania     ---           ---        ---         ---            ---              ---
            Wisco nsin        8            8,000      4,270   6.8xlO 6          100,000           8.0

               Coal and nuclear units,     .assuming a 50%  coal/50%  nuclear   mix, as  nated  above.
               Does not include Bailly nuclear unit, Porter County, on          site already containing
               two coal-fired units.

                      If an 8% growth rate is assumed, the figures in the table above           would
            increase by a factor ranging from 2.0 to 4.8, depending on the state being examined.
            This indicates that considerable pressure might be placed on the coastal counties
            of Great Lakes Basin for electrical energy generation facilities.

            C. POLICY OPTIONS

                      The policy options developed for this report fall into two categories:
            institutional and technical. The institutional options are further classified
            .into seven groups: siting policy, organizational arrangements,, functional respon-
            sibilities, siting procedures, siting criteria, financial mechanisms, and inter-
            governmental relations. The technical options address the types of energy facility
            development that might be included or excluded from the coastal zone. Environmental,
            economic and social considerations are included in both sets of options.

                 1. INSTITUTIONAL OPTIONS

                      Institutional options    were derived from the study of existing state pro-

            grams and of various proposals for improving such programs. Options for siting
<pb n="28" />

          policy describe several possible associations that the siting function may enter
          into with respect to other functions and programs. Emphasis in these options is
          on the possibilities for  the primary orientation of the program. Options for
          organizational structure  and arrangements focus on the composition of agencies
          responsible-for handling  siting and related issues. The.options for functional
          responsibilities address  the means for accomplishing some of the tasks associated
          with siting.
                 ,Options for siting procedures deal with the'procedural requirements of
          siting regulation that may be employed to meet the energy facility siting goa:ls,
          policies and objectives of the states. Options for siting criteria and standards
          are related to the options available to a siting program for the site selection
          process. Options for financial mechanisms offer the states several options to
          facilitate.the planned development.of energy. Options for intergovernmental
          relations involve options for interaction and coordination between federal and
          state agencies with responsibilities in energy facility  siting.

              2. TECHNICAL OPTIONS

                  The technical options related to energy facility siting and development
          with regard to the coastal zone have been arranged-to provide a full range of
          policy choices which-remain within the context of the Coastal Zone Management
          Act. The three major groupings of options were selected as they relate to
          jurisdictional decisions. They are:
                     Exclusion of all new facility development in the.coastal zone manage-
          ment area, including access to coastal waters and fuel transportation. This option,
          however, is precluded under the Coastal Zone Management Act.
                  0 Exclusion of all new facility*development in the coastal zone manage-
          ment area, but allowing access to coastal waters and fuel transportation.
                  0 Inclusion of new facility development in the coastal zone management area.
                  Throughout the development of these options it was assumed that all present
          and anticipated environmental controls will be operative as a minimum requirement
          and.that the presently stated guidelines of the Coastal Zone Management Act will
          be followed in the development of the state CZM programs. The first major option,
          that of excluding facility development including access to coastal waters and fuel
          transshipment, discusses economic and environmental'implications arising from such
          * pol icy. This policy would significantly affect lake movement of fuel and shift
          * greater demand to inland modes of transportation. Many of the technical    spin-offs
<pb n="29" />

                                                    12

             of such a policy relate to the resultant shift in transportation and the develop-
             ment of energy production technologies requiring less water. The    second major
             technical policy option excludes new facility development in the coastal zone
             management area but allows access to coastal waters, and fuel transshipment and
             pro duct transmission through the coastal zone. It was felt that this option would
             be more realistic under the guidelines of the Coastal Zone Management Act because
             the exclusion of facilities from coastal resources would not be complete. A
             number of suboptions were developed within this policy examining various methods of
             implementation relating to fuel delivery, provision of cooling water, and develop-
             ment of corridors for transmission of products such as electricity and oil back

             into the coastal zone.

                     The final set of options considers inclusion of new facility development
             in the coastal zone management area. Suboptions address specification of critical
             areas, development areas, and buffer control zones;  the encouragement of dispersed
             siting; limitations-on expansion or reconstruction; location in proximity to
             existing power grids or near transshipment facilities; maintenance or increase of
             public access to the shoreline, permitting shoreline use for energy facilities;
             setback distance for energy facilities; permitting shoreline use only bythose
             facilities absolutely requiring shoreline location; designation of coastal
             development priorities.to energy facilities; priority use for facilities employing
             by-product utilization; multiple use/single site development; and specification of
             type and size of facility allowed to site in the coastal zone.
                     These options were developed to provide a broad-range of policy choices
            ,that are feasible within present technical capabilities. The technical options
             were not constrained by existing policies, so it was possible to consider a number
             of innovative options that remain reasonable possibilities.
                     The energy growth rates used in this study do notaffect the particular
             options that might be chosen from the range of options developed. The growth rate
             of energy consumption in each state or substate-region would serve to suggest:
             how much emphasis a particular state should place on developing an energy facility
             siting program; how comprehensive that program could be in terms of facilities and
             fuels; what the areal extent of the program jurisdiction should be; which levels

             of government should be involved with the program; what involvement the coastal
             zone management program might have in.such a program; and what authorities and
             sanctions should be' vested in the program.
<pb n="30" />

                                                   13

                                             Chapter II

                                            INTRODUCTION

                   In the Great Lakes Region, people have become increasingly concerned
           about the uses to which the coastal areas have been and will be put. Future
           energy development in the Great Lakes coastal zone is of substantial importance
           to these people and to their governments, acting as resource trustees and man-
           agers for present and future generations. In response to public concern and to

           the Coastal Zone Management Act of 1972, each of the Great Lakes states is
           developing a coastal zone management program charged   to balance economic and
           environmental considerations affecting coastal'areas   and their waters.

                   The Coastal Zone Management Act recognizes both the economic and
           environmental significance of the coastal areas. It highlights the necessity
           of preserving certain areas from degradation and developing others. Growing
           concern about the impacts of energy development, particularly on the coastal
           areas, gave birth to the Coastal Zone Management Act Amendments of 1976. A
           major provision in these amendments grants funds to coastal states and local
           governments to offset the adverse economic and environmental   effects of de-
           veloping outer-continental-shelf oil and gas. Although this    does not apply to
           the Great Lakes, other provisions in the amendments promote   energy facilities
           study and planning, interstate coordination    and mitigation of impacts from the
           development of major@ fuel transportation and storage facilities. The energy,
           facilities study and planning grants for which the Great Lak  Ies state coastal
           zone management programs are eligible apply to study and planning for facilities
           in the coastal zone such as coal-fired and nuclear electrical generating facil-
           ities, refineries, fuel transshipment and storage facilities, and potential
           coal gasification and liquefaction plants.
<pb n="31" />

                                                    14

             A. STATE AND FEDERAL ACTIVITIES AFFECTING ENERGY'FACILITY SITING

                     Many state and.federal agencies are responsible   for energy development
             and energy-related environmental programs in -the Great'Lakes Region. Each of
             the Great Lakes states has a public service or public utilities commission,
             which regulates the provision of electricity and gas and establishes rates for
             these  energy sources. Some states also have commissions or boards with author-
             ity to monitor energy development and review proposed energy facilities. Each
             of the Great Lakes'states has laws, regulations, policies, and/or    .programs
             affecting energy facility siting. New York and Ohio have had siting p.rograms
             for several years. Minnesota and Wisconsin have,recently developed similar
             programs. The remaining states are using other governmental mechanisms (de-
             scribed in Chapter III) to address energy facility siting. As stated previously,
             the coastal zone management programs of each state, established under the
             Coastal Zone Management Act of 1972 (P.L. 92-583), must establish programs that
             balance environmental and economic values in the management of their coastal
             resources. Energy development highlights the trade-offs that must be made and
             is an important factor in the development of these programs.
                     several federal agencies are involved in the siting of energy facilities.
             The Nuclear Regulatory Commission is responsible for reviewing and licensing
             nuclear facilities., The Federal Power Commission licenses hydroelectric
             facilities and determines interstate gas rates.    The Environmental Protection
             ,Agency monitors and regulates environmental pollutants from energy facilities
             as well as from other types of plants. The Corps of Engineers is concerned
             with energy facility structures placed in navigable waters.- The Federal Energy
             Administration is responsible for establishing energy policies and the alloca-
             tion of fuels. The Federal Aviation Administration oversees air transport of
             nuclearIfuels. The Coast Guard is concerned with aids to navigation, adequate
             and.safe navigation conditions, potential pollutants to the aquatic environment
             of navigable waters, and potential obstacles to navigation. Furthermore, the
             National Environmental Policy Act of 1969 specifies environmental considerations
             that must be taken in federally funded, assisted, or licensed programs and
             projects. This includes federal responsibilities in the area of energy facili-
             ties and energy facility siting.
<pb n="32" />

                                                15

          B. CONCERN OF THE GREAT LAKES STATES COASTAL ZONE MANAGEMENT PROGRAMS ABOUT
              ENERGY FACILITIES SITING

                 The Great Lakes states coastal zone management  programs participate on
          the Great Lakes Basin Commission's Standing Committee  on Coastal Zone Manage-
          ment. This Committee was. formed to address opportunities, problems, and
          concerns of mutual, interstate or regional interest relating to coastal zone

          management.
                 In late 1975, the states were anticipating the passage of Section 308(c)
          and (d)(4) of the Coastal Zone Management Act Amendments which would (and do)
          provide grants to the Great Lakes and other coastal states for amelioration of
          impacts from fuel transportation and storage facilities in the coastal zone and
          for energy facilities planning. This p rovision appeared in both the House and
          Senate versions of the bill. Ata meeting in late 1975, the Great Lakes coastal
          zone programs caucused and identified energy facility siting as an area in which
          they felt they would like to have additional support in developing their pro-
          grams. As a result, the Commission staff developed a proposal for the Standing
          Committee on Coastal Zone Management to study energy facility siting policies
          and programs as well as projections and trends of energy use in the Great Lakes
          Region., The Great Lakes states indicated that, as their programs were up for
          approval within the next 12 to 18 months, they required immediate input in this
          important area, and asked the staff to revise the proposal to focus specifically
          on energy facility siting policies at the state and federal level, future re-
          gional energy developments, and policy options for the siting of energy facilities
          in the Great Lakes coastal zone. They also requested that the study be shortened
          from nine to four months at considerably reduced funding. As a result, the
          staff prepared a new proposal, which was approved by the Standing Committee on
          Coastal Zone Management in April, 1976, and was funded for approximately $53,760
          by the Office of Coastal Zone Management on June 30, 1976. The study began on
          July 6, 1976, and was conducted over a four month period.

          C. DEVELOPMENT OF THE STUDY

                 The objectives of the study were the examination of energy trends and
          the coastal dependence of energy facilities and the development of a full range
<pb n="33" />

                                                    16

             of policy options for the siting of energy facilities in the.Great Lakes
             coastal zone. A by-product of the study was the development of a facility
             activity impact matrix which can be used by the Great Lakes coastal zone pro-
             grams in evaluating future proposed facilities for the coastal zone. Also,
             scenarios were developed, based on a range of energy growth rates forthe region.
             These scenarios present their assumptions and related energy developments along
             with resource requirements to 1995, thus indicating the likely pressures on
             the coastal zone for various types of facilities. Finally, state and federal
             policies and programs related to energy facility siting were reviewed and
             summarized, and a comparative analysis of these programs is presented.
                    Once the Standing Committee on Coastal Zone Management approved the pro-
             posal, it established a steering committee for the project. The steering com@
             mittee was composed of representatives from the states of Wisconsin, Ohio,
             Pennsylvania, and Michigan, and from the federal agencies of the Department of
             the Interior, the Environmental Protection Agency, the Department of Transpor-
             tation, and the Department of Commerce. Members of the steering committee are
             listed in Appendix B. Theproposal also indicated that a group of technical
             advisors would be formed to advise the study staff   on technical matters., The,
             project manager asked the steering committee to identify persons who would be
             available and qualified to serve as technical advisors. Additional technical
             advisors were identified and  added as the study proceeded. These persons are
             listed in Appendix C.
                    After the funding was  approved for the study, the steering committee
             met, and the project manager  pr esented a lengthy listlof energy facilities which
             ..c,o.uld.be examined'in the.study. The steering committee reduced this list and
             ranked them acco rding to their apparent importance to the Great Lakes coastal
             zone. The facilities to be examinedi in order from first to third priority
             are: (1) electrical energy generation (fossil-fuel and nuclear); (2) fuel
             transshipment and storage; and (3) refining. Recognizing the time constraints
             on the study, the steering  committee indicated that if all types of facilities
             could not be addressed,.then the staff should address first those at the top
             of thelist, namely, electrical generating facilities.
                    During the course of the study, state and federal agencies and utili@y
             companies and other industries having energy facili  ties were continually
             involved in the review of interim draft papers prepared.by the project's staff.
             Furthermore, the technical advisors were consulted throughout the study and
<pb n="34" />

                                               17

          provided tremendous assistance to the staff. After the first two months of
          the study, the steering committee met to review its progress. On the advice
          of the project manager, the steering committee indicated that the focus during
          the study's last two months should be on electrical energy generation faciliti es
          and fuel transshipment and storage facilities.

          D. STAFF ORGANIZATION AND-FUNCTIONS

                 The principal areas of investigation in this study lent themselves to
          three major assignments: (1) analysis of institutions, policies, and programs
          concerned with energy facility siting; (2) analysis of coastal dependency and
          the economic and environmental considerations in the siting of facilities;,,@nd
          (3) analysis of the projections and trends and their relation to possible,
          scenarios of energy development.  Therefore,'the staff was organized into three
          principal units: the policy tnit, the coastal dependence unit; and the pro-
          jectiohs and trends unit. Two staff members served in the policy unit, three
          staff members in the coastal dependence unit, and two in the projections and
          trends unit. All persons were assigned according to their background and exper-
          tise. In addition, other Commission staff members were utilized inthe study
          as technical advisors. Commission staff committed to the study are listed in

          Appendix D.
                 The policy dnit reviewed, summarized and analyzed the state and federal
          policies, programs, legislation and regulations affecting energy facility
         .Siting in the Great Lakes Region. They also examined programs of coastal states
          outside the region. This unit also developed institutional policy options for

          the siting of energy facilities.
                 The coastal dependence unit developed a matrix and an analysis approach
          that can be utilized by the states in their assessment of proposed energy
          facilities. This unit also described in.detail the major elements of the prin-
          cipal types of energy facilities addressed in the study and their associated
          resource requirements. Finally, it provided an analysis of the environmental
          impacts, both natural and cultural, associated with facility construction and
          operation and the major cost components of each facility type.
                 The projections and trends unit analyzed existing energy flows within
          the region, particularly wit hregard to electricity and coal, and examined
<pb n="35" />

                                                   18

             projections and trends of future energy growth on the basis of its own analysis
             and with the assistance of the technical advisors. It also developed scenarios
             of energy development, given different.rates of growth and various assumptions
             regarding fuel mix..
                    The coastal dependence unit and the projections and  trends unit combined
             their efforts to report the implications on resource requirements of the various
             scenarios. In addition, these two units utilized their expertise to develop
             technical policy options for the siting of energy facilities in the Great Lakes
             coastal zone. These options incorporate the environmental and locational con-
             siderations that have been reported in the study.

             E.  LIMITATIONS OF THE STUDY

                    As previously indicated, the study focused only on electrical energy gen-
             erating facilities (fossil-fuel and nuclear), fuel (coal and.oil) transshipment
             and storage facilities, and refineries. Thus, the scope of the study is some@
             what narrow and is restricted to conventional technologies. -,
                    For the electric generating facilities, a generalized facility size was
             used to discuss the possible effects on the resources of the coastal zone. The

             principal reasons for this approach were:
                       The short time frame of the study did not lend itself to a discussion
             of range of facility size.
                    e More importantly, the study attempted to examine facilities of the
             size which were most likely to be constructed in the coastal zone.
             A 1000-MW plant,was selected for fossil-fuel and nuclear facilities. The other
             facility types investigated in this study did not lend themselves to a discus-
             sion of generalized facilities. The facility sizes for electrical generation
             mentioned above (or sizes very close to these) are cited.in the literature and
             have been used in recent studies of facility types and their resource implica-
             tions. Both larger and smaller facilities may be constructed depending on the
             particular requirements of the service area. The generalized facilities also
             enabled the staff to discuss from a general standpoint the possible resource
             requirements of future facilities and the resultant pressures on the Great Lakes
             coastal zone, a topic deemed very important to future management planning in the
             Great Lakes coastal zone with respect to energy facilities.
<pb n="36" />

                                                19

                 Throughout the report, figures for costs, land areas, water volume.s,
          and other(resources affected by the-siting of energy facilities  have been.pre-
          sented. This quantification has been provided wherever possible to give the
          users of this report a base of reference for future comparisons. Whenever
          possible, ranges of values for costs, land areas, or other resources were used
          to.indicate not only the range of possible resource requirements but also to
          suggest-that there are no@"hard" -or "firm" figures.
                'Most cost figures in this report use the years 1974 through 1976 as a
          base. This narrow range should give a good basis for comparison of facilities
          proposed in the future. Caution should be:used when examining and using any of
          the figures cited in the report; the figures will change quickly duo to infla-
          tion and site-specific or geographic considerations. Thus, these figures should
          be used to'discuss the relative, not absolute, magnitudes of effects or resource
          requirements of the various facilities. In some cases, cost information was
          difficult to obtain; in other cases, it varied so widelyas to be almost
          entirely inconsistent. After consultation with technical advisors, the staff
          did its best to determine an accurate estimate of these widely varying costs.
          Every attempt was made to obtain cost information from both government and
          industry sources so as not to-bias the information in one direction or the other.

          F. IMPORTANT FACTS AND DEFINITIONS

                 Several points concerning the study should be made clear.
                 o The Great Lakes states, through their coastal zone management programs,,
          have asked the Great Lakes Basin Commission staff to examine from a regional
          standpoint the coastal dependency of energy facilities and the resource require-
          ments.and pressures on the coastal zone from future  energydevelopment.
                 o The results of the study are not binding,   but only suggestive, and
          will be used by each Great Lakds state as it sees fit for the development of
          its own coastal zone management policies for the siting of energy facilities.
                 o The study examined the   implications of coastal versus inland siting
          of energy facilities and projections related to future energy facilities develop-
          ment. The study was not undertaken with the intent of excluding facilities from
          the coastal zone, but rather to provide the coastal zone management programs
          with a general technical understanding of the relationships involved in
<pb n="37" />

                                                   20

             the siting of facilities. Furthermore, the Coastal Zone Management Act specif-
             ically directs the states not to exclude from consideration facilities or uses

             of the coastal zone which are of greater than local concern. This would
             certainly apply to energy facilities.
                    e The definition of energy facilities for the purposes of this study
             .includes facilities for electrical energy generation (fossil-fuel and nuclear),
             fuel (coal and oil) transshipment and storage, and crude oil refining.
                    * The time.period,covered by the study is the next fifteen to twenty
             years - to 1995.
                    * In discussions of inland versus coastal locations for energy facilities,
             inland refers to a location generally one mile or more from the coastline, inland

             to a distance approximated by the inland boundaries of the Great Lakes states
             coastal counties. Coastal refers to general locations or sites on, or near (less
             than one mile from) the shoreline of the Great Lakes.

                    e Coastal dependence refers to the determination of energy facility loca-
             tion with respect to the shoreline of the Great Lakes. The following general
             considerations aid this determination: system requirement, safety, engineering,
             environmental, institutional, and economic. This definition broadens the analysis
             beyond simple.dependence on the coast into a more ge neral examination of facility

             location.

                    Other definitions essential for understanding the report are:
                    0 Coastal county--a county with frontage on one of the Great Lakes, their

             connecting channels, or the St. Lawrence River;
                    * Coastal zone--an area adjacent to the shoreline, generally much
             narrower and smaller in area than the tier of counties bordering the Great Lakes
             and connecting channels;
                    e Coastal zone management area--the area along the Great Lakes shoreline
             which is designated to come under the purview of the states' coastal zone manage-
             ment plans. The lakeward extent of the management area reaches to the inter-
             national or state boundary, as appropriate. The landward extent of the manage-
             ment area is generally a narrow strip of land, defined differently by each state
             (some Great Lakes states have not yet firmly Specified an  inland management
             boundary). Some activities (uses of or affecting land, air, water, etc.)
             adjacent to or beyond the management area which affect or influence the manage-
             ment area might also come under the jurisdiction of a state's coastal zone

            ,.management program.
<pb n="38" />

                                                21

           G. POLICY OPTIONS AND THEIR APPLICATION

                  Institutional and technical policy options for the siting of energy
           facilities in the coastal zone were developed by the staff. The institutional
           options suggest possible institutional arrangements which might be used by the
           states and their coastal zone management programs to enable them to better manage
           the effects of energy facilities located in the coastal zone. Some institutional
           options envision major reorganization; others suggest the use of existing
           institutional arrangements. The situation in each state will dictate the kinds
           of institutional options it might employ in planning for and managing the
           effects of energy facilities sited in the coastal zone.
                  It, should be noted that these options are only suggestions. This study
           and report have been undertaken with no intention of asserting that a particular
           state or program should adopt any of the options proposed. The Great Lakes
           states coastal zone management programs asked only that a full range of options
           be developed for their consideration. As the state CZM program staffs examine
           the options, they may identify additional options of a specific nature which
           could be incorporated into their programs, but, due to the brevity of the study,.
           could -not be developed for this report. Furthermore the selection of certain
           institutional options will necessarily preclude other institutional options.
                  The second group of options, the technical options, were developed on
           the basis of the technical, environmental, and economic research carried out  for
           the study. These options range from complete exclusion of energy facilities
           from the coastal zone to the inclusion of energy facilities on shoreline loca-
           tions. Some of these options may be unrealistic for some or all states. Some

           of the technical options are mutually exclusive. The implications of each
           option are described so that the state CZM pr.ograms will have an initial
           understanding of their respective opportunities and problems.
                  The energy growth rates used in this study do not affect the particular
           options that might be chosen from the range of options developed. The growth
           rate of energy consumption in each state or sub-state region would serve to
           suggest: how much emphasis a particular state might place on developing an
           energy facility siting program; how comprehensive that program might be in
           terms of facilities, fuels, and types of energy dealt with; what the areal
           extent ofthe program jurisdiction should be; which levels of government should
           be involved with the program; what involvement the coastal zone man agement pro-
<pb n="39" />

                                                    22

              gram might have in such a program; and what authorities and sanctions should be
              vested in the program.

              H. ADDITIONAL APPLICATION OF THE REPORT

                     The,Great Lakes states coastal zone management programs can merge the
              information assembled in this report with information on energy requirements of
              future industrial, commercial and residential development in their respective
              coastal zones. Once these programs can estimate the expected energy demands of
              industry and per capita residential use on an area-by-area basis, they can then
              estimate the needed energy facilities and their related resource requirements.
              Having better locational information for these facilities than is presently
              available will permit more meaningful and informed coastal zone management
              plans and decisions.
                     The study focuses only on the Great Lakes coastal zone of the eight states
              of New York, Pennsylvania, Ohio, Michigan, Indiana, Illinois, Wisconsin, and
              Minnesota. Thus, thelstudy does not-address energy facility siting or associated
              policy opti ons for the Hudson River mouth, Long Island Sound, and Atlantic Ocean
              portion of New York's coastal zone management program, nor the Delaware River-
              Chesapeake Bay estuary element of Pennsylvania's program. Although some of the
              information and policy options developed in this study could be useful in
              addressing resource management problems for these other areas, the states and
              their local levels of government will have to decide on the degree of applicabil-
              ity. With respect to projections of electrical energy consumption and associated
              resource requirements for the states of Pennsylvania and New York, only the north-
              west corner of Pennsylvania and upstate New York were considered. Maps of the
              Great Lakes basin and counties appear as Figures A and B.
                     Exact figures of energy facility cost and resource requirements are
              difficult, if not impossible, to arrive at. However, ranges of costs and
              resource requirements have been assembled in this report and are intended to be
              used to obtain a rough estimate of the magnitude of effects associated with energy
              facilities and to extrapolate estimates of future resource requirements of energy
              'facilities and the possible pressures on the Great Lakes coastal zone.
                     The policy options in this report suggest possible approaches to the
              planning for and management of the effects of energy facility development in the
              coastal zone. This study provides input for one particular aspect of coastal
<pb n="40" />

                                                                                                                            f

                                                                                                                                                                                                          S
                                                                                                                                                                                                                                                                           LE

                                                                                                                                                                                                                                              - - - - - - -      Gr,,af Lak

                                                                                                                                                                                                                                               -----------       Subbosins

                                                                                                                                                                                                                                                                 Subbasin
                                    MINNESOTA

                                                                                                 LAKE          SUPERIOR

                                                                                                                                                                                                                                         it,
                                                  uth
                                                       Superior                                                                                                                                ONTARIO
                                                                                                                                                                 it                                                                                               20

                                                                                                                 MICHIPAN

                                                                                                   t 4ts.
                                                                                                                                                                                                       0
                                                                                                                                                       0

                                                                                                                                                                                                                           HA Y
                                                                                                                                                                                  if
                                                                                                                                                                               IW N,

                                                                                                                                                                                            LAKE HURON
                                                                                       WISIC       N N
                                                                                                                   Cieen
                                                                                                                   Bay

                                                                                                                                                                                                                                                                         OVA
                                                                                                                                                             HIGAN                                                                                          LAICE        CAN
                                M
                                &gt;                                                                                                                                         City
                                                                                                                                                               Sgw     R""                                I                                               %
                                r-     cA                                                                                                  'wrl"                       Sagin
                                &gt;
                                ;r                M                                                                                        0 Muskegon
                                                                                                                                                                                                                                                                 Buffalo
                                M      C:         &gt;                                                   Milwaukee
                                                                                                                                                                                     Flint
                                                                                                                                              Grand Rapids       ft"',                                     clw R
                                                                                                            aeme        VV
                                                  &gt;                                                      K nosl@a'
                                &gt;                                                      WISCONSIN                                                                                                                                                               NEW4
                                (n                                                      ILtINOIS                                                                           A-    bo,   Detroit          ktw'                                    i,*: ,
                                                                                                                                                       Kalamazoo             a At 0
                                                  1711                                                                                                                                                                                         A.Z@
                                Z                 U)                                                                                                              Jackson                                                       Y,
                                0                 co        &gt;                                                                                          it",                                                       1-11      It,, P@       Erie"
                                o                 &gt;
                                                                                                                                                       PtICHIGAN        Ir
                                                                                                           Chicago                                                       _H
                                                                                                                                                       INDIAN@               1
                                                  Z                                       ILLINOIS           Kammon;                         DUth Send          "I
                                                                                                                             air--        kl@                                           ledir                        Cleveland
                                                                                                                                                                                                               Loiai
                                0                                                                                                                                                                                     oAkton           Z
                                Z                                                                                   6-! Z.                        Fort wayfli 0
                                                                                                                    Z It                                   I
                                                                                                                    Zia
                                                                                                                                                                        L Mao
                                                                                                                                I N D I A N A                1441                                       0 H     10
                                                                                                                                                              ,ZLO
                                                                                                                                                               :5
<pb n="41" />

                                                                                                                                                                                 LEGEND

                                                                                                                                                                         Great Lakes Regio
                                                                                                                                                                         Subregions
                                 4f' Nall
                                                                                                                                                                         Planning Subarea
                    MIN  ESOTA                                                                                                                                           Subregion number
                                                                                 I--,                                                                                    Planning Subarea
                                                            LAKE'     SUPERIOR
                                                                                         -4101                                                                           County Boundarie

                                                                                                                                                                                  STAWTE
                                                                       1.2                                                  ONTARIO                                          -
                                                                                                                                                                              0

                                                                       MICHIG    N                             .41. Af- R-,

                                                                                             2.4

                                                                                               'n

                                                                                                             it'

                                                                                                                                               11A Y
                                                                                          13
                                                                                         o
                                                   WISC    NSIN                                      .. .....             LAAE@HURON
                                                                                                             3A,
                                                                                             2A                                                                               ONTARIO
                                                                                                MI HIG N                                                             LA K F
               ;D                                                                                                                                                            CANADA - - -
               M                                                                                                                                                         - D.,j-IF, -SIAI(S
               &gt;
                                                                                                                 13.2
               r-
               &gt;          M
               ;K   -     &gt;                                                                                                                                    Ri,wr
               rri  Z     --1    17,                                         4p                                                                                                  5.1
                                                                                                                                 St. cli, Ri-
               co         &gt;
               &gt;                                   @@ISSCINSIN
                                                                                                                                  L,1@1                   11                    Y RK
                                                                                                                                 St. Clair                                             N1
                          U)                                                                                                                                                           EV
               U)                                    ILLINOIS                                                                                                    4.4
               z    (n
                    c     M                                    -2 2                                 .3
                          M                                                                                                                                                          -FENIN

                                                                                                ICHI N
                    &gt;     0                                                                                 0
                          z                           ILLINOIS
               U)   ;0
               (n                                                                                                  -                                9
               0    M                                                                                                                     4.
               z                                                                                                 4.2
                    &gt;                                                                                                                                  z

                                                                                    D I A N A                                    0 H   10
                                                                                                     z
<pb n="42" />

                                                25

          zone management. Its relation to other elements of the CZM program will hope-
          fully be resolved by the sta Ites. Thus, this report is intended to be a tool to
          assist the Great Lakes states coastal zone management programs and it is to
          .them that it is directed. The report is not and never was intended to be a
          definitive treatise on energy facility siting in the Great Lakes coastal zone.
                 While a broad group of technical advisors from both the public and pri-
          vate sectors participated in the study by reviewing and commenting on preliminary
          material and'the-draft report, this should not be taken as their endorsement of
          this final report. They served only as advisors, reactors, and providers of
          information. So that this point is well understood, it is restat  ed at appropri-
          ate places-in the report.
<pb n="43" />

                                                    27

                                              Chapter III

                                      INSTITUTIONAL CONSIDERATIONS

           A. INTRODUCTION

               1. PURPOSE

                   This chapter addresses the institutional (legal, organizational And
           procedural) aspects of energy facility siting, with emphasis on the Great Lakes
           states and their coastal zones. Institutional aspects aredistinguished from
           technical aspects, which are covered in the next chapter. The study of existing
           institutions provides the means for comparing the various state programs and for
           developing options for the states to consider in the context of federal programs
           and requirements as well as other related state programs. In a broad sense, the
           institutions associated with energy facility siting are primarily concerned with
           the structure of government, the structure of the energy industry and the relation-
           ship between them.

               2.  SCOPE

                   The first section describes federal legislation and agencies.that are
           deemed to have significant impacts on energy facility siting. The most direct
           federal involvement is found in the regulation of the siting of nuclear and certain
           hydroelectric facilities, though other significant federal involvement,is possible,
           especially in the area of environmental protection. For example, the U.S. Environ-
           mental Protection Agency has retained authority over the issuance of water and air

           permits.
                   Subsequent sections describe the energy facility siting programsin the
           eight Great.Lakes states and those in other coastal states that provide examples
           of unique and/or interesting approaches to the siting problem. Such features are
           emphasized in the descriptions.
                   The final section provides a set of criteria which interested persons may
           use to evaluate a state siting program. Several features of state programs are
<pb n="44" />

                                                    28

          described, and a table is provided to show how these features are addressed b   y

          each of the states.

          B. ENERGY FACILITY SITING REGULATION

              1. FEDERAL

                  The Congress has recently  considered, but has not passed, legislation that
          would specifically address energy  facility siting. This leaves the federal gov-
          ernment with a direct role in siting only in the case of hydroelectric generation
          and nuclear energy facilities. However, several federal laws and regulations
          affect siting less directly and involve a number of federal agencies in the process.
          The Coastal Zone Management Act of 1972 as amended is of central importance to this
          study and will be discussed first. Another federal statute, the National Environ-
          mental Policy Act of 1969, established a major federal program with widespread
          application and will thus be discussed separately. The remainder of the existing
          federal legislation that significantly affects or is related to the siting of the
          types of energy facilities under consideration in this study are discussed under
          the appropriate administrative agencies.

                  a. Coastal Zone Management Act
                  The Coastal Zone  Management Act  (CZMA) of 1972 (P.L. 92-583) created a comprehen-
          sive program to plan for  and manage the nation's coastal areas. "The Act recognizes
          that the coastal zone is  rich in a variety of natural-, commercial, recreational.,
          industrial, and esthetic  resources of immediate and potential value to the present
          and future well-being of  the nation" [632]. The Act responds to the problem that
           presentstate and institutional arrangements for planning and regulating land
          and water uses in the coastal zone are often inadequate.to deal with the competing
          demands and the urgent need to protect natural systems in the ecologically fragile
          area" [6321.
                  Significant amendments to the Act   (P.L. 94-370) were passed  in 1976 that
          (among other things) expanded the program   to provide for increased planning and
          management of energy development which affects the coastal zone.
                  The general institutional approach of the CZM program is one of providing
          federal technical and financial assistance to coastal states to encourage them to
          develop programs for the management of their coastal resources. The eight Great
          Lakes states are currently developing coastal zone management programs pursuant
<pb n="45" />

                                                     29

           to the federal legislation. Of particular significance to this     study are provisions
           for establishing an energy facility planning process within the    CZM programs of each

           coastal  state.

                    Subsection 305(b) of the Act  as amended indicates thatthese    programs must

           include:

                    (1) an identification of the boundaries of the coastal zone
                    subject to the management program;
                    (2) a definition of what shall constitute permissib   'le land
                    and water uses within the coastal zone which have a direct,
                    and significant impact on the coastal waters;
                    (3) an inventory and   designation of areas of particular
                    concern within the coastal zone;
                    (4) an identification of the means by which the state proposes
                    to exert control over the land and water uses referred to in
                    paragraph (2), including a listing of relevant constitutional
                    provisions, laws, regulations, and judicial decisions,;.
                    (5) broad guidelines on priority of uses in particular areas,
                    including specifically those uses of lowest priority;
                   @(6) a description of the organizational structure proposed
                    to implement the management program, including the responsibilities
                    of local, areawide, state, regional, and interstate agencies in
                    the management process,,
                    (7) a definition of the term "beach" and a planning process
                    for the protection of, and access.to, public beaches and other
                    public-coastal areas of environmental, recreational, historical,
                    esthetic, ecological, or cultural value;
                    (8) a planning process for energy facilities likely to be
                    located in, or which may significantly affect, the coastal
                    zone, including, but not limited to, a process for anticipating
                    and managing the impacts from such facilitiesi.
                    (9) a planning process for (A) assessing the effects of
                  ,shoreline erosion .(howeve 'r caused), and (B) studying and
                    evaluating ways to control, or.lessen the impact of, such
                    erosion, and to restore areas adversely affected by such erosion.

                    Although the Great Lakes states are at different stages in the development
           of their management programs, once they have-defined the inland    management boundary(s)
           of the coastal zone in their respective states and,the programs    are approved by
           the Secretary of Commerce and thus implemented, futu-ke-activities and planning
           efforts must acknowledge whether they.are in or significantly affect-the coastal
           zone. If they are in or   affect the.coastal zone,@the plans must receive the approval
           of the state's coastal zone management program and be certified as consistent with
           it. In the case of   activities on federally owned lands, no final de  cision has yet
           been made concerning consistency requirements.
                    In determining the,permissible.land and water uses within the coastal    zone,
<pb n="46" />

                                                      30

             the-states must evolve and apply an objective  procedure which includes at a minimum:

                     (1) a method for relating various specific land and water
                     uses to impact upon coastal waters, including utilization of
                     an operational definition of'"direct and significant impact,"
                     (2) an inventory of natural and manmade coastal resources,
                     (3) an analysis or establishment of a method for analysis
                     of the capability and suitability for each type of resource
                     and application to existing, projected, or potential uses-P
                     (4) an analysis or establishment of a method for analysis of
                     the environment al impact of reasonable resource utilizations [6331.
                     Based on the analyses [mentioned above] and applicable Federal,
                     State and local policies and standards, the State(s) should
                     define permissible uses as those which can be reasonably and
                     safely supported by the resource, which are compatible with
                     surrounding resource utilization and which have a tolerable
                     imp4ct upon the environment [6331.

             In the event that the states prohibit certain uses.within the coastal zone, the
            @reasons for the prohibition should.be identified.
                     The States must include in their respective management programs an. inventory
             and designation of areas of particular concern within the coastal zone, based on
             a review of natural and manmadecoastal zone resources and uses, and-upon consid-
             eration of state-established criteria. According to the rules and'regulations
             implementing.the Act, the factors considered in these designations must include

             at a minimum:

                     (1). Areas of unique, scarce, fragile or vulnerable natural
                     habitat, physical feature, historical significance, cultural
                     value and scenic importance;
                     (2) Areas of high natural productivity or essential habitat
                     for living resources, including fish, wildlife and the various
                     trophic levels-in the food web critical to their well-being;
                     (3) Areas of substantial recreational value and/or opportunity;
                     (4) Areas where developments and facilities are dependent
                     upon the utilization of, or access to, coastal waters;
                     (5) Areas of unique. geologic or topographic significance to
                     industrial or commercial development;
                     (6) Areas of urban concentration where shoreline utilization
                     and water uses are highly competitive;
                     (7) Areas of significant hazard.if developed, due to storms,
                     slides, floods, erosion, settlement, etc.; and
                     (8) -Areas needed to protect, maintain or replenish coastal
                     lands or resources, including coastal flood plains, aquifer
                     recharge areas, sand dunes, coral and other reefs, beaches,
                     offshore sand deposits and mangrove stands [633].

             The intent inspecifying,areas of particular   concern is to convey some degree of
             statewide concern about them and.then to incorporate them within the scope of the
<pb n="47" />

                                                     31

            management programs. In this manner, the states will give these areas special
            attention in the development and implementation of policies and actions to manage
            areas of particular concern.
                    Of-special relevance to this study and  its policy options'(described in
            Chapter VI) is the possible designation of: areas,to be preserved, such as areas
            of unique, scarce or fragile natural habitat, historical significance, or aesthetic
            importance; areas of high natural productivity or essential habitat; and areas
            of substantial recreational value or opportunity. These areas should generally
            b4 avoided or affected minimally by energy facilities in their construction,
            expansion and/or operation. Another important factor to be considered in the
            siting of energy facilities is the designation of: areas of unique geologic or
            topographic significance (to industry or commerce), and areas of highly competitive
            uses for shoreline and water in and near urban concentrations. The possible-
            designation of 'Ienergy resource areas" as areas of particular concern to the energy
            industry as well as to other industry, commerce, and the public are important for
            the future provision of energy to the coastal zone and areas inland. The concern
            for energy-related needs must be balanced with other-land uses. This general
            ,approach is addressed in-greater detail in Chapter VI. Finally, areas of signif-
            icant hazard and areas needed to protect, maintain, or replenish coastal lands
            or resources must receive special attention in planning.
                   A significant facet of the coastal,zone management.programs that could affect
            energy facility siting is the development of policies or guidelines for establishing
            pr1iorities in areas of particular concern for at least those permissible land and
            water uses discussed above. The  guidelines for these priorities'will describe the
            extent of state interest in the preservation, conservation, and orderly development
            of specific areas. Certain areas could receive high priority for development,
            and other areas, low priority for development, including energy facilities. Sub-
            section 306(c)(9) of the Act further states that the coastal zone management
            agencies, in order to receive approval of their programs, must provide for "procedures
            whereby specific areas may be designated for the purpose of preserving or restoring
            them for their conservation, recreational, ecological or esthetic values." Thus,
            using the state procedures and criteria for preservation and restoration designation,
            these areas can be given a low priority for development, thereby essentially
            precluding development, including energy facilities, from those areas..
                   Additionally, in order to address the requirements of Subsection 306(e)(2),
            the management programs must provide evidence that lithe state has developed and
<pb n="48" />

                                                   32

            applied a method for determining @ises of regional benefit and has established
            a method for assuring that local land and water use controls in the coastal

            zone do not unreasonably or arbitrarily restrict.or exclude those uses,of
            regional benefit" [633]. Through this requirement, local decisions concerning
            land and water use are.prevented from arbitrarily excluding uses that are of
            importance to more -than a single unit of government. However, the state may
            determine that certain land and water-uses are of regional benefit under certain
            conditions or circumstances only. It must   then establish standards and criteria
            for determining when these conditions exist. Complete exclusion or restrictions
            of these uses in the coastal zone cannot be made through local regulation unless
            they are based on 11reasonable considerations of the suitability of the area for
            the uses or the carrying capacity of the.area" [633]. Therefore, energy
            facilities may be permitted in some coastal areas but not in others. Furthermore,
            certain types or sizes of energy facilities may be permitted in certain locations
            whereas other types or other sizes of similar facilities may be precluded from

            the same locations.
                    In addition, Subsection 306(c)(8) of the Coastal Zone Management Act as
            amended includes a requirement that "the management program provides for adequate
            consideration of the national interest involved in planning for, and in the
            siting of, facilities (including energy facilities in, or which significantly
            affect, such state's coastal zone) which are necessary to meet requirements which
            are other than local in nature." In other words, energy facilities may not be
            arbitrarily excluded from coastal zones if they are considered.to be in the
            national interest. Otherwise, the regulation of energy facility'siting is
            (except as otherwise indicated) left to.the discretion of each state._
                    Section 306(e) of the Act specified that the state management program

            must provide

                    for any one or a combination of the following general
                    techniques for control of land and water uses within the
                    coastal'zone:
                      a. State establishment of criteria and standards for
                    local implementation, subject to administrative review and
                    enforcement of compliance;
                      b. Direct state land and water use regulation; or
                      C. State administrative review for   consistency with the
                    management program.of all development plans, projects, or
                    land and water use regulations, including exceptions thereto@
                    proposed by any state or local authority or privatedeveloper,
<pb n="49" />

                                                   @33

                   with power to approve or disapprove after public notice and
                   an opportunity for hearings.

          .Thus, the state must, at the least, oversee local zoning practice in the  coastal
           zone and enforce the provisions of the coastal zone program.
                   Due to the specific relationship established between  coastal zone
           management and energy facility planning as a result of the 1976 amendments,
           the following sections of the Coastal Zone Management Act as amended are of
           particular relevance to this study:
                   9  Subsection 305(b)(8), which requires each state program to include.
           a planning process for energy facilities;
                   0  Subsection 308(c), which makes grants available to states for the-study
           of and planning for any economic, social, or environmental effects of energy
           facilities of all types in or significantly-affecting the coastal zone;
                      Subsection 308(d)(4), which provides for grants to coastal stat es-
           to assist them in the prevention, reduction, or amelioration of unavoidable loss

           to the coastal zone of valuable environmental or recreational resources

           resulting from a coastal energy activity.
           The coastal energy activities outlined in the amendments which apply,  or poten-
           tially could apply, to the Great Lakes states are: (1) "any transportation,
           transfer, or storage of oil, natural gas, or coal"; and (2) "any transportation,
           conversion, treatment, transfer, or storage of liquified natural@gas." Energy
           facilities (distinguished from coastal energy activities) refer to all.types
           including but not limited to: electric generating plants; petroleum refineries
           and associated facilities; gasification plants; facilities used for transpor-
           tation, conversion, treatment, transfer, or storage of liquified natural gas;
           uranium enrichment or nuclear fuel processing facilities; oil and gas facilities,
           including@platforms, assembly plants, storage depots, tank farms, crew and supply
           bases, and refining complexes; facilities, including deepwater ports, for the
           transfer of petroleum; pipelines and transmission facilities; and terminals
           which are associated with.the foregoing facilities.
                   Subsection 305(b)(8) of the 197-6 amendments states that:

                   The management program for each coastal state shall include... (a)
                   planning process for energy facilities'likely to be located
                   in, or which may significantly affect, the coastal zone,
                   including, but not limited to, a process for anticipating
                   and managing the impacts from such facilities.
<pb n="50" />

                                                     34

             According to proposed rules published in the Federal  Register on December 6,
             1976 (Department of Commerce, National Oceanic and Atmospheric Administration
             [15 CFR Part 920] Coastal Zone Management Program Development Grants, PP.
             53418 13425) [6361, the planning process for energy facilities referred to in
             the Act should include:

                      (1) A means of identifying energy facilities which are
                      likely to be located in or which may significantly affect
                      the coastal zone;
                      (2) A procedure for assessing impacts for such facilities;
                      (3) Development of State policies and other techniques
                      Jor the management of energy facility impacts; and
                      (4) A mechanism for coordination and/or cooperative working
                      arrangements, as appropriate, between the State coastal
                      .management agency and other relevant State, Federal, and
                      local agencies involved in energy facility planning [6361.

                      To reiterate the intent of Subsection 305(b)(8), the planning process is
             to cover.energy facilities, whatever their location, that significantly affect
             the coastal zone (outside the coastal zone but having major effects on it, or
             within the coastal zone), and whenever they might reasonably be expected to have
             effects (benefical or adverse, social) economic, or environmental) in the

             coastal zone.

                      In developing procedures for energy facilities impact assessment, states
             should include in their planning process assessment of the impacts',from energy
             facilities that must be considered under Section 308 of the Act, the Coastal Energy
             Impact Program, (discussed further below)-as applicable to the Great Lakes states.
             These im pacts might include, but are not limited to, "increased population,
             changed employment patterns, changed demands for public facilities and services,
             local price inflation, changed patterns of tax or user fee revenues, effects on
             fishing revenues, effects on beaches and sand dunes, shoreline erosion, effects
             on airand water quality, and ecological effects."
                      With respect to the development of state policies and techniques for the
             management of energy facility impacts, the state coastal zone management programs

             are

                      encouraged to develop, in cooperation with other appropriate
                      agencies, procedures for assessing need/demand projections;
                      for allocating these needs among coastal and inland locations;
                      for ident*ifying potential coastal impacts; and for determining
                      site suitability-of alternate locations for particular facilities [636].

             (See "Policy Options Related to the Siting of Energy Facilities in the Great
<pb n="51" />

                                                  35

          Lakes Coastal Zone,"  Chapter VI.) Suitability analysis of particular sites could
          be accomplished with  funds authorized under Subsection 308(c) of the Act as
          amended (see below). It should be recognized that the nature of the policies
          and techniques for managing energy facility impacts in or significantly affecting
          the coastal zone that are incorporated in the overall implementation program will
          depend in part on the type and extent of energy facility siting policies and
          techniques already in existence at the local,.state, and federal levels.
                   With respect to developing mechanisms for coordination and cooperation
          between the state coastal zone management agency  .and other local, state, and
          federal agencies, the Act states that the states "should give particular atten-7
          tion to,State and Federal agencies already involved.in various aspects of energy
          planning. At a minimum, where interstate plans exist (as referred to in Sub-
          section 306(c)(8) of the Act), these plans should be taken into consideration."
          The consideration of interstate energy plans or programs in the state coastal
          zone management programs will facilitate some regional consistency among the CZM
          programs in energy planning with respect to the management of resources and
          energy facility impacts in or affecting the coastal zone. The proposed rules.for
          Program Development Grants also suggest that cooperative arrangements be made to
          use energy data, projections, estimates of facility needs, and policies developed
          by others, including government energy and utility agencies.and energy industries.
          This report provides a substantial amount of material on these matters in the

          Great Lakes Basin.

                   Concerning energy facility environmental planning grants for which the
          Great Lakes states  are eligible, Subs ection 308(c) of the Act states that:

                   The Secretary [of Commerce] shall make grants  to any coastal state
                   if the Secretary finds that the coastal zone of such state is
                   being, or is likely to be, significantly affected by the siting,
                   construction, expansion, or operation of new or expanded energy
                   facilities. Such grants shall be used for the study of, and
                   planning for (including, but not limited to, the application of
                   the planning process included in a-management program pursuant
                   to Section 305(b)(8))  any economic, social, or environmental
                   consequence which has occurred, is occurring, or is likely to
                   occur in such state's coastal zone as a result of the siting;
                   construction, expansion, or operation of such new or expanded
                   energy facilities. The amount of any such grant shall not
                   exceed 80 per centum of the cost of such study and planning.

          The objectives of this subsection of the Act as applied to the Great Lakes states
          are (1) to aid the states in planning for the economic, social and environmental
<pb n="52" />

                                                      36

              effects ensuing, or expected to result, from thesiting.or operation of new or
              expanded energy facilities in or.that significantly affect the coastal zone,.and
              (2) 11to encourage rational, timely, and thorough planning forthe management of,
              energy facility siting and the impacts from-energy resources development."
              According to the proposed rules (previously cited), energy facility siting and
              impact studies might include:

                      (1) Collecting data and taking physical measurements;
                      (2) Making projections of.employment, population, public facility
                      and public service needs and costs, and tax and user fee revenues;
                      (3) Comparing the consequences of alternative energy facility types
                      or sites;
                      (4) Examining private industry or government siting policies; and
                      (5) Conducting analyses required for coastal State.or local
                      government regulatory decisions, including licenses, leases, permits,
                      and zoning ordinances [6351.

              In the Great Lakes states, planning for the management of energy facility siting
              and the amelioration of impacts from energy resources development  might include,

              but not be limited to:

                      (1) Devising methods of protecting recreational or environmental
                      resources in the coastal zone...
                      (2) Devising strategies for recovering compensation from
                      .appropriate parties for any adverse impacts caused by the. energy
                      activity involved;
                      (3) Preparing for the provision of new or improved public
                      facilities and public services required as a result of new or
                      expanded coastal energy activity... ;
                      (4) Designing and carrying out an equitable intrastate fund
                      allocation process ... ; and
                      (5) Devising strategies for the public purchase of land upon or
                      near which energy-related development is to take place in order to
                      capture the benefits of the increased value of such land or to
                      contain such development [6351.

              The proposed rules indicate that an eligible coastal state may be allotted a
              proportion of the 308(c) moneys appropriated to the fund based on employment
              equivalencies-for planned energy facilities listed with the Office of Coastal
              Zone Management. The proposed rules stipulate that the state agency(s) receiving
              these funds do(es) not necessarily have to be the agency responsible for coastal
              zone management, but must be desi gnated by the Governor of the state to receive
              the funds and must certify that the uses of the funding assistance are compatible
              with the state's coastal zone management program. Certain limitations have been
              placed on the use of Subsection 308(c) funds under the proposed rules: (1) the
              funds cannot be used to "duplicate the development of the general planning
<pb n="53" />

                                                    37

           process for coastal energy facilities required of management.programs under
           [sub1section 305(b)(8)," and (2) the funds may not beapplied to,general studies
           or plans separated from existing, proposed or planned energy facilities [6351.
                   Subsection 308(d)(4) of the Act states that:

                   The Secretary [of Commerce] shall make grants'to      any coastal state
                   to enable such state to prevent, reduce, or ameliorate any unavoid-,
                   able loss in such state's coastal zone of any valuable environ-
                   mental or recreational resource, if such loss results from coastal
                   energy activity,...

           A major objective of this provision is to "encourage payment of the full cost of
           those environmental.and recreational losses resulting from coastal energy activity
           by the [individual, corporation or other organization] responsible for the loss".
           [6351. The grants are available only if there is no'other means to recover the
           cost of amelioration, reduction or prevention of the unavoidable environmental or
           recreational loss from the   individual, corporation, or orgaLnization causing the
           loss, or from another federal program. With respect to the Great Lakes states
           these grants would apply primarily to the costs of prevention, reduction, or
           amelioration of any unavoidable loss in the coastal zone of valuable environmental
           or recreational resources-due to the transportation,'transfer and storage of oil,
           natural gas, or coal.
                   The consistency requirements of the    Act (Section 307)   affect both state
           actions and the actions.of all federal agencies conducting, supporting, or
           licensing activities in the coastal zone.     Rules proposed (41 FR 42885) pursuant
           to Section 307 require that "[c]oastal zone    manag  eme.nt programs developed by the
           coastal states shall-give full consideration to federal consistency         requirements
           and such consideration shall be reflected by procedures incorporated       in the
           management program to: (1) review the consistency of     federally conducted or
           supported activities including Federal development projects, (2) provide public
           notice and review of the certification of consistency statements developed by
           applicants for Federal licenses and permits, and (3) review the consistency of
           Federal assistance to applicant agencies."
                   State and local agencies applying.for federal assistance       under'federal
           programs affecting the coastal zone must "indicate the views of      the appropriate
           state or local agency as to the relationship of such Activities      to the approved
           management program for the coastal zone" [Section 307(d)].      IFurthermorel the
           proposed rules require federal agencies to comply with the consistency policies
           and procedures of Section 307.. "Federal agencies shall:          Develop procedures--
<pb n="54" />

                                                     38

             to provide State agencies with notification and an opportunity to review the
             consistency of Federally conducted or supported activities, including Federal
             development projects, (2) not grant Federal licenses or permits if the State
             agency objects to the applicant's certification, unless the objection is over-
             ridden by the Secretary [of Commerce], and (3) not grant federal assistance to
             applicant agencies if the State agency finds that the proposed activity is not
             consistent with the management program, unless the State agency objection is
             overridden by the Secretary [of Commercel".[6341.
                     On August 10, 1976, the Assistant Attorney General, Office of Legal
             Counsel, Department of Justice, issued an opinion concluding that, "The exclusion-
             ary clause [in the Act] excludes all lands owned by the United States from the
             definition of the Coastal Zone.." OCZM believes (as stated in a draft position
             paper) that regardless of the fact that lands owned by the federal government
             are not to be included wi thin the boundaries of a state's coastal zone, authority,
             under the federal consistency provisions of the CZMA is still sufficient to re-
             quire Federal land-holding agencies to conduct actions on such lands in conform-
             ance with approved state programs, when the proposed actions will have spill-over
             impacts in the coastal  zone. For example, if- a federal agency were to undertake
             an activity on federal  lands which would directly affect an area adjacent to it.in
             the coastal zone,.then  the agency would be required to proceed in a manner
             consistent to-the maximum extent practicable with the state's program.
                     Thus, an approved state coastal zone management program becomes a legal
             document requiring consistency from federal activities directly affecting the
             coastal zone, including activities conducted, supported or licensed by federal
             agenc.i.es. Federal activities that affect the siting of,energy facilities are

             outlined below.

                     Consistency with the state CZM program is assured through a variety of
             mechanisms. The program itself must be developed in consultation with the
             appropriate federal agencies. The approval process entails further federal
             agency review. Once the plan is approved, state and local applicants for federal
             funding or licensing must first obtain approval from the state CZM agency.
             Federal agencies receiving other applications. also require that the applicant
             must certify "tha t the proposed activity complies with the state's approved
             program and that such activity will be conducted in a manner consistent with the
             program" [Section 307(c)(3) as amended].
<pb n="55" />

                                                39

                  The development of a single plan and program for management of the
          coastal zone of each state and the requirements for consistency therewith pro-
          mote a unified approach to the management of the coastal zone. The-consistency
          requirements further guarantee that energy facility siting will be considered in

          terms of alternative uses of coastal lands and the use of other lands in the

          vicinity of such facilities. The siting of individual energy facilities will be
          considered in terms of the siting of other energy facilities and will provide a
          measure of rationality and planning for the best means of supplying energy needs.
          The fact that all state plans and programs are reviewed and approved by a single
          (federal) agency (the Department of Commerce) helps insure consistency in manage-
          ment practices across state lin es. The entire CZM program is. expected to insure
          comprehensive, timely, and effective coastal zone planning and management through
          the integration of the planning and decision-making process.
                  The CZM energy facility planning approach as discussed above incorporates
          the determination of permissible land and water uses; the designation of areas of
          particular concern; the designation of areas to be preserved, conserved, restored,
          or generally avoided as well as areas for development; the development of priori-
          ties for permissible land and water uses; the considerations for uses of regional
          benefit and in the national interest; and the considerations for federal-state
          consistency. In addition, once a state has an approved@energy facilities
          planning process, including a means of identifying energy facilities that  would
          significantly affect the coastal zone (whether they be located on or near the
          shoreline or inland), a procedure for assessing energy facility impacts, state
          policies and techniques for managing energy facility impacts, and a mechanism for
          coordination and cooperation with other-agencies involved in energy facility
          planning, it has what might be considered the nucleus of an energy facility siting
          program for the state's coastal zone and inland areas adjacent to it (and off-
          shore or nearshore locations within state jurisdiction in the case.of floating
          and/or anchored facilities) in which energy facilities that significantly affect
          the coastal zone might be located. For states that already have some form of an
          energy facility siting program (see below) which applies to the entire state,
          such a process will serve to give emphasis to the sensitive areas and resources
          possibly affected by and the potential impacts (positive and negative) from
          energy facilities to be located in or near the coastal zone of those states. The
          environmental planning grants (under Subsection 308(c) of the Act) permit the

          states to move one important step beyond energy facility siting programs examined
<pb n="56" />

                                                   40

            in this report (below) by providing funds to study and plan for any economic,
            social, and environmental consequence resulting from the siting, construction,
            expansion, or operation of new or expanded energy facilities in or significantly
            affecting the coastal zone. Also, Subsection 308(d)(4) provides opportunity for

            remuneration for costs of environmental or recreational losses resulting from
            coastal, energy activity.
                    Thus, the Coastal Zone Management,Act as amended provides a comprehensive
            and basic framework for addressing energy facility siting in or affecting the
            Great Lakes coastal zone. This is particularly significant for states not already
            having state-wide energy facility siting programs. The policy options for energy
            facility siting described later in this report (Chapter VI) elaborate on the
            po ssibilities for further development of energy facility siting controls and
            programs by the Great Lakes states, given the Coastal Zone Management Act and its

            Amendments as a foundation.

                    Additionally, grants are available for interstate coordination and for
            research and technical assistance. The interstate grants (Sec. 309, as amended)
            are for "coordinating state coastal zone planning, policies and programs with
            respect to contiguous areas" [309(a)(1)]. The establishment of interstate
            compacts or temporary planning and coordinating entities is encouraged. Grants
            are available under Section 310, as amended, "to assist (coastal) states in
            carrying out research, studies and training required with respect to coastal zone
            management" [310(b)]. Grants are also available for acquiring, developing or
            operating estuarine sanctuaries and for "acquiring lands to provide access to
            public beaches and for other coastal areas of environmental, recreational,
            historical, aesthetic, ecological, or cultural value, and for the preservation
            of islands" [Sec. 315, as amended].
                    The coastal zone management plan developed by each state must be approved
            by the Secretary of Commerce before that state may begin receiving funds for the
            administration of its CZM program. Plan approval is contingent upon the factors
            noted above, as well as others included in the Act as amended and in the imple-
            menting rules and regulations.

                    b. National  Environmental Policy Act
                    The National Environmental Policy Act (NEPA) is one of the most signifi-
            cant federal environmental statutes. The principal action-forcing provision is
            the detailed environmental statement that is required under Section 102(2)(,c) of
<pb n="57" />

                                                     41

           the Act for any major federal action significantly affecting the quality of the
           human environment. The purpose of the detailed statement is the identification

           .and assessment of the environmental impacts of a proposed federal action before
           the action is taken. The five action review criteria include: (1),the potential
           environmental impacts of the action, (2) the unavoidable adverse impacts involved,
           (3) the irreversible commitments of resources caused by the action, (4) short-
           term considerations vis-a-vis long-term resource needs, and (5) alternatives to
           the proposed action. The lead federal agency is responsible for preparation of
           the EIS, although this is often delegated to a consultant, applicant, or to a
           state agency involved in the organizational arrangement associated with the
           federal action. Pursuant,to regulations promulgated by the Council on Environ-@-
           mental Quality  (which administers NEPA), federal agencies have established NEPA
           guidelines covering their respective actions. 'The following list indicates the
           lead federal agencies with NEPA responsibility     for various types of energy

           facilities.

                                Facility                       NEPA Responsibility

                         Hydroelectric generation            Federal.Power Commission
                           facilities
                         Nuclear fired steam electric        Nuclear Regulatory Commission
                           generation facilities
                        :'Coal,-oil, and gas fired steam     U.S. Army Corps of Engineers,
                           electric,generation               if Corps permit is required
                           facilities.

                         Port and Terminal
                           handling facilities

                         Petroleum refineries                U.S. Environmental Protection
                                                               Agency--but only in those
                                                               states in which EPA has
                                                               retained authority over water
                                                               (e.g., Illinois) and air dis-
                                                               charge permits.
                         Any new source of air'or
                           water discharges

                   Themajor energy facility siting implications of NEPA revolve around the
           mandatory assessment of the environmental effects of a proposal involving a
           federal agency or role. The policies and.procedural requirements contained in
           NEPA and in the associated administrative rules and regulations,.as well as
           subsequent legal interpretations of the Act have established a mechanism for
           Public involvement in energy facility siting proposals.
<pb n="58" />

                                                       42

                      c. Nuclear Regulatory Commission (NRC)

                           (1) General
                      The Nuclear Regulatory Commission is a     five--@mer@ber commission established
             under the Energy Reorganization Act of 1974 to      assume the regulatory functions of
             the Atomic Energy Commission. In addition to licensing the construction and
             operation of nuclear power plants, the Commission also oversees fuel fabrication
             facilities, fuel reprocessing plants and enrichment plants.
                      Under the Energy Reorganization Act, the IVRC was authorized to undertake
             the Nuclear Energy Center Site Survey, which considers the possibility of
             (1) establishing nuclear energy centers (NEC's) containing up to forty nuclear
             power plants (1200 MWe each) on a single site; or (2) establishing fuel-cycle
             centers which would accommodate fuel fabrication and reprocessing, uranium
             enrichment and waste disposal; or (3) combinations of (1) and (2). This survey
             has been published [48 thru 54] and it concludes that, while' the siting of up to
             twenty reactors on a single site can be feasible and practical, there is no great
             advantage or compelling need for such centers.
                      The NRC has three components: the Office of Nuclear Reactor Regulation,
             the Office Nuclear Material Safety and Safeguards, and the Office of Nuclear
             Regulatory REsearch. The Office of Nuclear Reactor Regulation reviews the safety
             of and safeguards for all nuclear facilities, materials and activities, including
             the monitoring of existing systems, the testing of new systems and recommendations
             for updating systems. They also have primary responsibility for the safe trans-
             portation of nonfissionable nuclear materials and for the       licensing and regulation
             of liquid metal fast breeder reactors (LMFBR's).
                      The Office of Nuclear Material Safety and Safeguards sets standards,
             issues licenses, and enforces regulations for construction and operation of
             facilities which   produce or use fissionable materials, including nuclear power
             plants,, uranium milling and enrichment facilities, fuel fabrication and reprocess-
             ing plants, plutonium production facilities and-rad,ioactive waste treatment
             facilities. It is also responsible for the transportation and storage of fission-
             able materials and radioactive wastes, industrial security a      nd safeguards, anti-
             trust provisions of the Atomic Energy Act, liability coverage associated with
             nuclear power, and the financial stability of utilities dealing in nuclear power.
                      The Office of Nuclear Regulatory Research is charged with developing
             recommendations for research related to licensing and regulatory functions and
             with performing or contracting for such research.
<pb n="59" />

                                                   43

                   Concerning nuclear radiation hazards, the role of the NRC preempts state
          efforts; i.e., no state may enact restrictions more limiting than those of the
          NRC (see Northern States Power.Co. v. State of Minnesota). Section 274 of th        e
          Atomic Energy Act, enacted in 1959, provides for states to- assume certain regula-
          tory functions over small quantities of nuclear material, but this bears little
          or no relation to the area of energy production.
                   In the early months of the National   Environmental Policy Act of 1969, the
          Atomic Energy Commission displayed great reluctance to consider factors other
          than those specifically related to thenuclear aspects of power plants in their
          licensing process. The change came with the.Calvert Cliffs case (Calvert Cliffs
          Coordinating Committee, Inc. v. AEC, 449F.2d.1,109 or 2ERC 1779) which determined
          that the AEC was required to comply with NEPA; i.e., that they must consider all
          environmental impacts before approving the construction or operation of a nuclear
          power plant. As a result, the NRC and     several states duplicate efforts in
          environmental review. Attempts are being made to eliminate duplication and

          coordinate the state and.federal efforts.

                       (2) Siting Procedures
                   The process employed by NRC for issuing permits for the construction of
          nuclear  power plants consists of three separate functions that proceed simultane-
          ously.   These functions are: (1) safety, (2) environment and site suitability,
          and (3)  Antitrust. The first step in the process is the filing of an application
          for, a construction permit by the utility and its acceptance by the NRC. Notice
          of the filing is published in the Federal Register and copies.are distributed to
          appropriate state and local authorities and to a public document room in the

          vicinity of the proposed   site. Also a notice of hearing is published in,the
          Federal.Register and in local.newspapers.
                   For the environment and site.suitability review, the NRC staff prepares
          a draft environmental statement (DES) which is reviewed by federal, state and
          local agencies and other interested persons. The comments received become part
          of the final environmental statement (FES). Both documents are made available
          to the general public. A public hearing follows the FES.
                   The safety review includes the preparation of a safety evaluation report
          (SER) by the NRC staff. Safety is the responsibility of the Advisory Committee on
          Reactor Safeguards (ACRS). After their review, the.staff issues a supplement to
          the SER which@ discusses any action taken as a result of the review. A public
<pb n="60" />

                                                     44

              hearing may then be held; possibly in conjunction.with the environment and site
              suitability hearing. Hearings are conducted.by the Atomic Safety and Licensing
              Board (ASLB) which is responsible for issuing the permit. Appeals go automati-
              cally to an Atomic Safety-and Licensing Appeal Board-and, if necessary, to the

              NRC commissioners.

                      Antitrust reviews areconducted by the NRC and the Attorney General.
              Antitrust hearings, if necessary, are separate from other hearings.
                      The process is essentially repeated for an operating license once the
              plant has been constructed. Public hearings are not mandatory here but may be
              held if requested by responsible parties. The operating license specifies
              conditions for operation. Continuous surveillance and periodic inspections are
              conducted by NRC.
                      The authority of the NRC does not diminish that of the U.S. Environmental
              Protection Agency or of the states on issues relating to applicable federal air
              and water pollution control legislation.

                      d. Environmental Protection Agency (EPA)
                      Of all the federal policies, programs, rules and regulations associated
              with the siting of energy facilities, those of the Environmental Protection
              Agency are probably the most complex and have the most far-reaching implications.

              Within the scope of the nationwide pollution control programs, the EPA has a
              major, if indirect, role in energy facility siting in the Great Lakes states. It
              is charged@primarily with implementing the mandates of the Clean Air Act
              (PL 91-604 as amended) and the Federal Water Pollution Control Act (PL 92-500
              as amended). Under these Acts, the EPA is directed to promulgate rules and
              regulations detailing performance standards, and with one exception, the states
              were given the primary enforcement responsibility. The states are required to
              implement management programs and adopt air and water quality standards that are
              at least as stringent as those stipulated by EPA. The EPA monitors state per-
              formance, and retains ultimate authority if necessary.

                          (1) Air Quality Program
                      The existing federal air quality.policy and.implementation program is
              derived from two major statutes: The Clean Air Act of 1967, and the Clean Air
              Act Amendments of 1970. Through these Acts the states have been given authority
              to and are required to establish enforcement programs to implement federal policy
<pb n="61" />

                                                   45

           and standards. The major aspects of the air quality program that are relevant
           to this study include the following:
                      The establishment of national ambient air quality standards (NAAQS)
           for a variety of pollutants.
                    0 The establishment of performance standards for new stationary sources
           of pollution.
                    * The prevention of significant deterioration of air quality exceeding

           national ambient standards.

                    * State enforcement of federally mandated emission limitations,
           compliance schedules, and enforcement provisions.

                             (a) National ambient air quality standards (NAAQS)
                    Under Section 109(a)(1) of the Clean Air Act Amendments of 1970, the
           Administrator of EPA was directed to promulgate national primary and secondary
           ambient.air quality.standards for each air pollutant. Primary standards were
           established to protect health with an adequate margin of safety. Secondary
           standards are designed to protect the public welfare, including such things as
           property, from any known or anticipated adverse effects created by the presence
           of pollutants in the air (see Table 1 for NAAQS). All states were required to
           attain primary standards no later than May 31, 1975, and secondary standards
           within "a reasonable time." The Administrator may, under Sections 110(    -e) and
           110(f), and upon request by the Governor of a state, postpone attainment of
           primary standards for a period of  up to two years if certain criteria are satis-
           fied. However, this is not to be interpreted as a continuous source of variance
           from attainment of the NAAQS in the future.

                            (b) New stationary source performance standards
                    Section 111 of the Clean Air Act directed the EPA to promulgate emission
           standards for new stationary sources of pollution. Included in these categories
           are fossil-fuel fired steam electric generating plants of greater than 250 million
           Btu[hr heat input. The major air pollutants generated by f   ossil-fuel fired
           steam electric generating plants are total suspended particulates, sulfur dioxide,,
           and to a lesser extent, nitrogen dioxide. For these facilities, the following
           standards apply:
             Total suspended particulates   [40 CRF 60.421:
                    ... no owner or operator ... shall discharge or cause the discharge
                    into the atmosphere of particulate matter which is:
<pb n="62" />

                                                         46

                                                       TAB LE 1

                                                AMBIENT AIR QUALITY STANDARDS

                Pollutant         Averaging.Time        Primary Standards          Secondary,Standards
                Particulates      Annual (G)                  75 pg/M3_                   60 pg/m'
                                  24-Hour a                  260 jig/M3                  150. jjg/r'rj3

                S02               Annual (A)                  80 pg/M3
                                  24-Hour a                  365 Ug/M3
                                  3-Houra                                               1300 pa    3

                Co                8-Houra                     10 Mg/M3                    10 mg/m,
                                  I-Houra                     40 Mg/M3                    40 Mg/M3

                N02               Annual  (A)                100 pg/M3                   100   pg/M3

                Photochemical     I-Houra                    160 Vg/M3                   160 pg/M3
                Oxidants

                Hydrocarbons      3-Houra                    160 pg/M3                   160 pg/M3
                                  (6 to 9  a.m.)
                aNot to be exceeded more than once       a year@

                (A) Arithmetic mean
                (G) Geometric mean

                      .(a) In excess of 0.10 lb. per million B.t.u. heat input
                       (0.18 g. per million cal.) maximum 2-hour average.
                       (b) Greater than 20 percentopacity, except that 40 percent
                       opacity shall be permissible for not more than 2 minutes in any
                       hour.
                       (c) Where the presence of uncombined water is the.only reason
                       for failure to meet the requirements of Paragraph (b) of this
                       section, such failure shall not be a violation of this section.
<pb n="63" />

                                                       47

           o Sulfur dioxide [40 CFR 60.431:
                    ...no owner or operator ... shall   discharge or   cause the discharge
                    into the atmosphere of'sulfur dioxide in excess of:
                    (a) 0.80 lb. per million B.t.u. heat input (1.4 g. per million cal.),
                    maximum 2-hour average, when liquid fossil fuel is burned.
                    (b) 1.2 lbs. per million B.t.u. heat input (2.2 g. per million cal.),
                    maximum 2-hour average, when solid fossil.fuel is burned.
                    (c) Where different fossil fuels are burned simultaneously in any
                    combination, theapplicable standard shall be determined by proration.
                    Compliance shall be determined using the following formula:

                                              X(O.80) + z(1.2)
                                                  X + y + z

                    where:

                         x is the  percent of total heat input     derived from gaseous
                           fossil  fuel and,

                         y is the  percent of total heat input     derived from liquid
                           fossil  fuel and,

                         z is the  percent of total heat input     derived from solid
                           fossil  fuel.

           0 Nitrogen dioxide     [40 CFR 60.44]:
                    ... no owner  or operator... shall discharge    or cause the discharge
                    into the atmosphere of nitrogen oxides in       excess of:
                    (a) 0.20 lb. per million B.t.u. heat input (0.36 g. per million cal.),
                    maximum 2-hour average, expressed as N02, when gaseous fossil fuel
                    is burned.
                    (b) 0.30 lb. per million B.t.u. heat input (0.54 g. per million cal.),
                    maximum.2-hour average, expressed as N02, when liquid fossil fuel
                    is burned.
                    (c) 0.70 lb. per million B.t.u heat input (1.26 g. per million cal.),
                    maximum 2-hour average, express;d as N02, whet solid fossil fuel
                    (except lignite) is burned.
                    M When different fossil fuels are burned,simultaneously in any
                    combination the applicable standard shall be determined by proration.
                    Compliance shall be determined by using the following formula:
                                           x(O.26),+ X(O.30) + z(O.70)
                                                     X + Y + z

                    where:

                         x is the percent of total heat input derived from
                           gaseous fossil fuel and,
                         y is the percent of total heat input derived from
                           liquid fossil fuel and,
                         z is the percent of total heat input derived from
                           solid fossil fuel.
<pb n="64" />

                                                       48

                                (c) Prevention of significant deterioration
                       Another major component of the Clean Air Act, and one that is extremely
               important to the siting of energy-facilities,. is the prevention of significant
               deterioration (nondegradation) of air that is already clean. Pursuant to a 1973
               U.S. Supreme Court decision, the EPA was required to promulgate regulations to
               insure nondegradation [459]. The approach taken was to establish increments of

               air quality which cannot be exceeded by any new source or combination of sources
               within a specific impact zone. In addition, three classes of areas were identi-
               fied in which varying degrees of additional pollution are permitted. Class I
               areas are those where little or no degradation (i.e., little or no development)
               is permitted. In Class II areas, moderate degradation of existing air quality
               (i.e   some additional development) is allowed. In Class III areas, a substantial

               amount of deterioration of existing air quality is allowed, thus permitting
               concentrated or large'scale development [459]. In no case will deterioration be
               permitted which violates the national primary and secondary ambient air quality
               standards. The allo wable increments for sulfur dioxide and suspended particulates

               are shown in Table 2.

                                                     TABLE 2
                            ALLOWABLE INCREMENTS OF AIR QUALITY DETERIORATION (ug/m3

               Pollutant                         Class I          Class II          Class III

                Sulfur Dioxide

                 Annual                              2                 15                 80
                 24-hour                             5                100                365
                  3-hour                             25               700               1300

                Total Suspended Solids

                 Annual                              5                 10                 75
                 24-hour                             10                30                150

                       Initially the EPA classified the entire U.S. (except those areas that
               already violate secondary standards) as a Class II area. The states may redesig-'
               nate areas as either Class I or Class III, provided that certain public participa-
               tion procedures are followed, subject to EPA approval.
<pb n="65" />

                                                 49

                            (d) State implementation plans
                  Under Section 110, the states, through their respective EPA-approved
          state implementation plans (SIP), are the primary enforcement agencies of the
          Clean Air Act. In order to establish a control mechanism, the EPA designated a
          system of air quality control regions (AQCR).. Each AQCR is typically composed
          of several counties, after involving two or more states. In the SIP's the states
          are required to establish and enforce for each AQCR, ambient air quality and
          emission standards that are at least as stringent as those stipulated above by
          EPA. The SIP must include (among other things) the specification of land use
          and transportation controls to insure the attainment of the federal primary and
          secondary ambient standards. In addition, states are required to institute pre-
          construction review procedures to insure that new sources of pollution, such as
          energy facilities, will meet primary and secondary ambient air quality standards.

                           .(e) Energy Supply and Environmental Coordination Act of 1974
                  The Energy Supply and Environmental Coordination Act of 1974 (ESECA)
          amended Section 119 of the Clean Air Act by providing a short-term suspension of
          stationary-source fuel or emission limitations to permit the continued use of
          coal as a fuel source. This is not to be construed as a permanent variance.
                  Another major aspect of ESECA that is related to air quality is Section 4

          of the Act, which mandated the review of all state implementation plans to
          determine whether revisions in performance standards can be made to permit the
          increased use of coal as a primary fuel source without jeopardizing the attain-
          ment of national primary and secondary ambient air quality standards.
                  Under Section 309 of the Clean Air Act, the Administrator of EPA is

          required to review and comment on the environmental impact of certain matters
          relating to the authority of the EPA under all applicable federal environmental
          protection legislation, dealing with air, water, toxic substances, etc. Matters
          included in this provision are (1) legislation proposed by any federal agency,
          (2) newly authorized federal construction projects and any major federal action
          covered by environmental impact statement-requirements under Section 102(2)(c) of
          NEPA, and (3) proposed regulations published by any federal agency. If the EPA
         @determines that the legislation, action, or regulation of concern is unsatis-
          factory from the standpoint of public health-or welfare or environmental quality,
          formal notification of this finding is referred to the Council on Environmental

          Quality.
<pb n="66" />

                                                    50

                               (f) Implications for energy facility siting
                      It is generally agreed that the federal air quality program will have
              significant implications for the siting of energy facilities. All facilities

              must meet new source performance standards using the best available control

              technology regardless of the site. In addition, no new source will be permitted
              which clearly violates national ambient air quality standards even if it meets
              the new source emission standards. Finally, existing clean air areas are pro-
              tected by the non-degradation provisions, and emissions from new energy facili-
              ties must fall within the limits established for their areas, which are designated
              ,as Class I, II or III. Currently, the Environmental Protection Agency is
              administering the significant air quality deterioration program and has tenta-

              tively classified all areas as Class II. As the states incorporate@this program
              into their planning process they can redesignate areas as Class I or III.
              Designation of an area as Class III would permit substantial new sources of air
              emissions, such as fossil-fuel fired power plants, provided the new source,
              emission standards and ambient air quality standards are met.
                      For certain facilities, the costs of emission control equipment for new
              sources of emissions will vary according to the degree of air quality degradation
              permitted. In Class I areas, or in areas where the ambient air quality is
              approaching the national ambient standards, these costs will be considerably
              higher than Class II or III areas and may be prohibitive. On the other hand,

              designation of an area as Class III would require less sophisticated emission
              control.technology and would encourage the siting of certain kinds of energy
              facilities that would have difficulty meeting the standards imposed in Class I or

              II areas.

                          (2) Water Quality Program
                      Another major federal program with significant implications for the siting
              of energy facilities is the,clean water program, embodied for the most part in
              P.L. 92-500, the Federal Water Pollution Control Act Amendments of 1972, and also
              administered by the EPA. The approach taken is similar to that of the Clean Air
              .Act. Goals, policies and minimum standards were established by the federal govern-
              ment, and the states are required to enforce standards at least as stringent as
              the federal standards through the state implementation plan (SIP) process. At the
              present time, all states in the Great Lakes Basin except Illinois are empowered
              by EPA to act as administrators of federal policy. The major aspects of the clean
<pb n="67" />

                                                   51

           water program that are relevant to this study include:
                   0  The establishment of effluent guidelines and standards for various
           pollutants for various categories of point sources of pollution.
                   * The control of thermal discharges.

                   * The control of intake structures.

                   * The National Pollutant Discharge Elimination System (NPDES)     permit,

           program.
                      The State Implementation Plan Process.

                             (a) General policy
                   Congress included in its statement of policy in Section 101 of P.L 92-500
           the following:

                   1.  it is the national goal that the discharge of pollutants into
                       the navigable waters be eliminated by 1985;
                   2.  it is the national goal that wherever attainable, an interim
                       goal of water quality which provides for the protection and
                       propagation*of fish, shellfish,-, and wildlife and provides for
                       recreation in and on the water be achieved by July 1, 1983;
                   3.  it is the national policy that the discharge of toxic pollutnats
                       in toxic' amounts be prohibited.

           These goals and policies are the basis of the rules, regulations and standards
           .that have been developed to control.the discharges of waste from energy facilities

           and other sources into the nation's waters.
                   Another significant policy declaration was contained in Section 301, which
           inandated the application of the best practicable-control technology currently
           available by July 1, 1977, to all point sources of water pollution. Furthermore,
           it required the application of the best available technology economically achiev-
           able by July 1, 1983. Effluent guidelines and standards have been promulgated to
           achieve these 1977 and 1983 goals.

                            (b) Effluent guidelines and   standards
                   In or der to implement clean water policies, effluent guidelines and
           standards were established for a variety of the typical sources of pollution.
           Among these point sources are steam-electric power generating facilities fired by
           coal, oil,, gas, or nuclear fuels, and petroleum refineries.
                   On October 8, 1974, special procedures for permit   issuance and eff luent.
           guidelines and standards were established for the various   operational phases of
<pb n="68" />

                                                      52

              coal, oil, gas, or nuclear-fired steam-electric facilities [624]. Parameters for
              which standards were set include-heat, total suspended solids, pH, oil and grease,
              copper, iron, chlorine, zinc, chromium, and phosphate. Chlorine, used extensively
              to treat,water discharged by power plants, is recognized by the EPA as a poten-
              tially significant source of water pollution [624]. Thus, effluent guidelines
              to protect aquatic organisms from the toxic effects of chlorine have been
              .promulgated by EPA. The maximum permissible concentration of free Available
              chlorine in water discharged from either once-through cooling systems or1cooling
              towers is 0.5 mg/l, while the highest average concentration allowed is 0.2 mg/l,
              although EPA has recently been applying more   stringent limitations on chlorine
              concentrations. Furthermore,

                      Neither free available chlorine nor total residual chlorine may be
                      discharged from any unit for more than two hours in any one day and
                      not more.than one unit in any plant may discharge free available or
                      total residual chlorine at any one time unless the utility can
                      demonstrate to the regional administrator or state, if the state
                      has NPDES permit issuing authority, that the units in a particular
                      location cannot operate at or below this level of chlorination
                      [62 41.

              The results of recent research indicate that these short-term limitations may
              undergo modification in the near future.
                      In addition to regulating point discharges, standards are applied to the
              area runoff associated with these facilities, including that generated by the
              disturbance of the earth's surface during construction, and that generated by the
              storage of materials such as coal or ash.
                      The effluent guidelines dealing primarily with thermal discharges were
              recently remanded to the EPA by the Fourth Circuit Court of Appeals for revision.
              Those guidelines dealing with thermal discharges are particularly subject to
              revision. Thus, regulation of discharges from steam-electric generation
              facilities is in a state of flux. However, state water quality standards still
              apply.

                                W Control of thermal discharges by closed-cycle cooling
                      In reco gnition of the potentially significant adverse environmental
              implications of thermal discharges from electric generation facilities, the
              Congress gave special consideration to controlling this type of pollution in the
              development of P.L. 92-500. In promulgating administrative rules pursuant to
              the Act, the EPA determined that, for certain categories of electric generation
<pb n="69" />

                                                   53

           units, closed-cycle evaporative cooling represents the best Available technology
           economically achievable for controlling heated water discharges, Power plants
           covered by the closed-cycle cooling requirement include those units of 25 Mwe
           capacity or larger placed into operation on or after January 1, 1974, and those
           units of 500 MWe capacity or larger placed into operation on or after operation
           on January 1, 1970 [6214    However, the EPA has also determined that, due to the
           time involved in converting to closed-cycle cooling and due to the necessity of
           insuring the reliability of electrical generation in the short term, once-through
           cooling (or at least no additional restraint on heated discharges) represents
           the best practicable control technology currently available. Thus, compliance
           with the closed-cycle cooling requirement will not take effect until 1977.

                             (d)  Variance from thermal discharge limitations
                   Although Congress1dentified as an important objective the control of
           thermal discharges from power plants, it also acknowledged that, under certain
           circumstances, closed-cycle cooling would not be required to meet the objectives
           of P.L. 92-500. Under Section 316(a) of the Act, if an owner or operator of a
           facility-that discharges heated  water can demonstrate to the satisfaction of the
           Administrator of EPA or the state that the effluent standards are more stringent
           than necessary to maintain a balanced, indigenous population of shellfish, fish
           and wildlife in or on the receiving body of water of concern, the Administrator
           or the state may grant a variance from such requirements and impose alternative
           thermal discharge effluent limitations, provided that the continued existence of
           the aforementioned aquatic-oriented species will not be jeopardized.
                   In order to obtain a variance under Section 316(a) one must make appli-
           cation to the EPA or to the state, and demonstrate that at least one of the
           criteria listed below is satisfied. (These criteria are extracted-from [627].)'

                 e Absence of prior appreciable harm. Under this criterion.it must be
                   demonstrated that (1) no appreciable harm has resulted from the
                   thermal component of the discharge (taking into account the inter-
                   action of such thermal component with other pollutants and the
                   additive effect of other thermal sources) to-a balanced, indi-
                   genous community of shellfish, fish and wildlife in and on the
                   body of water into which the discharge has been made, or (2) despite
                   the occurrence of such previous harm,' the desired alternative
                   effluent limitations (or appropriate modifications thereof) will
                   nevertheless assure the protection and propagation of a balanced,
                   indigenous community of shellfish, fish and wildlife in and on the
                   body of water into which the discharge is made.
<pb n="70" />

                                                     54

                   e  Protection of representative, important species. A variance may be
                      granted if it can be demonstrated that the discharge will assure the
                      protection and propagation of representative, important species
                      whose protection and propagation, if assured, will assure the
                      protection and propagation of a balanced, indigenous community of
                      shellfish, fish and wildlife in and on the body of water; unless
                      unrebutted information received duringthe period provided for
                      public comment or evidence introduced at any bearing held to
                      consider the permit indicates:
                      -that the species selected by the Regional Administrator are  not
                      representative, in terms of biological needs, of a balancedi-
                      indigenous community in the receiving water body; or
                      -that the temperature requirements employed in calculating the
                      proposed alternative effluent limitations are not adequate to
                      assurethe protection and propagation of those species in and
                      on the receiving water body; or
                      -that the temporal or spatial distribution of the mixing zone
                      is excessively large,or otherwise inconsistent with the purpose
                      of section 316(a).
                      Evidence provided by biological engineering and other data.
                      Alternative effluent limitations can be imposed if the applicant
                      can provide evidence supported by data, models, etc. that indicate
                      that either of the first two criteria will be met or if such
                      limitations will assure the protection and propagation of indi-
                      genous aquatic life [627],.

              A technical guidance manual has been issued by the EPA to guide the development
              of a 316(a) demonstration.

                      Several 316(a) demonstration studies in the Great Lakes Basin have been
              completed or are in progress, and variances from the ciosed-cycle cooling require-
              ment are'quite common. Most of the applications for 316(a) variances have been
              associated with requests either for approval of cooling systems currently em-
              ployed in existing power plants, or of expansion of  generating capacity at these

              facilities.

                               (e) Control of cooling water intake structures
                      Another major influence on energy facility siting'contained in P.L. 92-500
              is Section 316(b). According to this section any standard established to control
              point sources of pollution must require'that the location, design, construction,
              and capacity of cooling water intake structures reflect the.best technology
              available for minimizing adverse environmental impacts. Section 316(b) is
              applicable to all existing as well as new cooling water intake structures.
                      The issues associated with the location, design, construction, and
              capacity of intake structures [316(b)] are often more complex than those related
<pb n="71" />

                                                   55

           to 316(a) demonstrations and generally need to be,evaluated in detail on a case-
           by-case basis. In support of this conclusion, the development document for
           intake structures, which is the official source of EPA-guidance on'these matters
           addresses this complexity:

                   Ow ing to the highly site specific characteristics  of available
                   technology for the location, design, construction   and capacity of
                   cooling water intake structures for minimizing adverse environ-
                   mental impact, no.technology can be presently generally identified
                   as the best technology available, even within broad categories of
                   possible application. Within this context, a prerequisite to the
                   .identification of best technology available for any specific site
                   should 'be a biological study and associated report to characterize
                   the type, extent, distribution, and significant overall environ-
                   mental relation of all aquatic organisms in the sphere of influence
                   of the intake, and an evaluation of available technologies,,!to
                   identify the site specific best technology available for the location,
                   design, construction and capacity of cooling water intake structures
                   for minimizing adverse,environmental impact [628].

                   Although the Section 316(a) and 316(b) demonstrations are separate
           processes, there is a relationship between' the type of cooling system employed
           and the location, design, capacity, and construction activity associated with
           the intake structure used with that system. Also, in a given situation, the
           environmental impacts of an existing or proposed intake structure may well be
           more significant than  those associated with the cooling system employed, and the
           issues related to the  intake structure may require more scrutiny by the EPA or

           the state.

                             (f) National pollutant discharge elimination system (NPDES)
                   The NP DES permit system was established under Section 402 of P.L1. 92-500
           and is the regulatory mechanism through which effluent guidelines and standards
           for energy facilities are enforced. All point source discharges into.the nation's
           waters (with a few exceptions) must obtain an NPDES permit. Procedures have been
           established which insure public access to information, public hearings, and
           agency review. States are intended to be the enforcing agency of the NPDES
           program, but EPA can assume control if a state's approach is unacceptable.

                             (g) State implementation plan process (SIP)
                   Pursuant to Section 303(e) of P.L. 92-500, the states are designated the
           primary agencies of the clean water program, provided that they can demonstrate
<pb n="72" />

                                                    56

              the initiative and capability for pro'ram administration. They are required to
                                                   9
              maintain ongoing comprehensive water quality management programs which implement
              federal policies and standards. The states may enforce standards that are more
              stringent than those of the-federal government. They are required to designate
              all segments of their respective waters as either "water quality limited" or
              ."effluent limited" segments. A segment is classified as "water quality limited"
              if it does not meet and/or is not expected to meet applicable water quality
              standards assigned to it even after the application of effluent guidelines and
              standards to the various uses of the water. A segment is classified as "effluent
              limited" if water quality is meeting and will continue to meet applicable stand-
              ards or will meet such standards after the application of effluent guidelines
              and standards. All of the Great Lakes states except Illinois have been designated
              as the primary program administrators., The EPA currently administers the program
              in Illinois, but formal approval of the Illinois program by EPA is likely in the

              near future.

                      In setting standards, the states are required to consider and incorporate
              the following criteria (excerpted from [6291):

                   *  Water quality standards shall specify appropriate.beneficial water
                      uses to be achieved or protected and the waterquality criteria
                      necessary to support those appropriate beneficial: uses;
                   9  Water quality standards shall be established taking into consider
                      ation their use and value for public water supplies; propagation
                      of fish, shellfish, and wildlife; recreational purposes; and
                      agricultural, industrial, and other purposes; and also taking into
                      consideration their use and value for navigation;
                   e  Water quality standards shall be such as to protect the public health
                      or welfare, enhance the quality of water and serve the purposes of
                      the Act [629].

                      Another major element of the SIP is the development of a statewide non-
              degradation policy and regulatory mechanism. The non-degradation policy must be

              consistent with these criteria:

                   *  Existing in-stream beneficial water uses shall be maintained and
                      protected. No further water quality degradation which would result
                      in impairment of existing in-stream beneficial uses is allowable.
                   *  Existing high quality waters which exceed those levels necessary to
                      support propagation of fish, shellfish and wildlife and recreation
                      in and on the water shall be maintained and protected unless the
                      .State chooses, after full satisfaction of the intergovernmental
                      coordination and public participation provisions of the'State's
                      continuing planning process, to allow lower water quality as a
                      result of necessary and justifiable economic or social development.
<pb n="73" />

                                                   57

                   in such cases, the state must assure that the highest statutory
                   and regulatory requirements for all new and existing point
                   sources and feasible management or regulatory programs pursuant
                   to Section 308 of the Act will be achieved..'
                e  In those cases where potential water quality impairment
                   associated with a thermal discharge is involved, the anti-
                   degradation policy and implementing method shall be consistent
                   with section 316 of the Act [629].

                            (h) Implications for energy facility siting
                   The federal and state water pollution control programs, created for the
           most part by P.L. 92-500, will exert a great deal of influence on energy facility
           siting in the Great Lakes Basin. However, one cannot conclude from the above
           discussions that existing federal water pollution control policy will either
           strongly encourage or discourage the siting of energy facilities in the coastal
           zone or inland. The influence on siting of the EPA or the authorized state agency
           iri@terms of water resources will depend largely on the existing conditions at the
           proposed site and the applicable water quality standards and guidelines in effect

           for that site.

                   In any event, water quality standards will be met by any new energy
           facility in the Grea t Lakes Basin. If specific site conditions dictate the
           employment of sophisticated technologies, for cooling systems and of other prac-
           tices to avoid unacceptable degradation of water resources, economic considerations

           become critical.

                            (i) Relationship between EPA programs and coastal zone'
                                 management
                   There are some fundamental relationships between air and water quality and
           the use of the coastal zone, and several of the policies and provisions contained,
           in the air and water pollution control programs and the CZM program have recog-
           nized the importance of these relationships. In developing policies and planning
           processes to guide the siting of energy facilities in the coastal zone, the Great
           Lakes states must give full consideration to the applicable provisions of the
           appropriate federal acts.
                   There exists a two way consistency between the Coastal Zone Management
           Act (CZMA) on the one hand, and the Clean Air Act and the Federal Water Polllution
           Control Act on the other. Section N7 of.the,CZMA established,the requirement
           that any activity in a state's coastal zone involving participation of a federal
           agency must be consistent with the approved CZM program of that state.. However,
           Section 307(f) of the CZMA also clearly states that it does not diminish the
<pb n="74" />

                                                      58

               authority vested in the air and water pollution control programs:

                       ...nothing.in this [Act] shall in any way affect any requirement
                       established by the Federal Water Pollution Control Act, as amended,
                       or the Clean Air Act, as amended, or established by the Federal
                       Government or by any state or local government pursuant to such
                       Acts. Such requirements-shall be incorporated in any.program
                       developed pursuant to this title and shall be the  'water pollution
                       control and air pollution control requirements applicable to such
                       programs.

               Nothing in the state's CZM program may violate any standard s promulgated under
               the authority of these Acts. Also, the state CZM agency cannot set air or water
               quality standards directly [630, 6311.
                       One issue of particular interest in the siting of energy facilities in
               the coastal zone is,the possibility that air or water pollution control standards
               might be used to encourage or discourage siting in particular areas of a state's
               coast. According to the EPA General Legal Counsel, states may not impose more
               stringent (or more lenient) limitations on the discharge of airor water pollu-
               tants merely because the discharge occurs in the coastal zone [630]. Thus, not
               only must CZM plans comply with applicable EPA air and water quality requirements,
               but these standards and guidelines provide the baseline  for environmental pro-
               tection in plan development.

                       As indicated above, the determination of consistency of actions with the
               approved state CZM plan must be based on a comprehensive framework of planning
               for coastal areas resources. The state CZM entity may not object to an action as
               being inconsistent with the CZM plan on the grounds that the effective effluent
               limitations and standards set by EPA orby  that state (as empowered by EPA) are
               not sufficiently stringent [6301.
                       Success of the CZM program depends largely on communication and coordina-
               tion between the state CZM entity and agencies and interests at all levels of
               organization. Coordination between the CZM programs and those programs administered
               by the EPA is especially significant.. In developing CZM plans and in establishing
               energy facility policies and planning processes, the states should coordinate
              .activities with areawide wastewater management plans (P.L. 92-500, Section 208)
               and Level B river basin plans (P.L. 92-500, Section 209, and the Water Resources
               Planning Act of 1965, P.L. 89-80). Also, existing policies for prevention of
               significant deterioration of air quality, and the zones classified by these
               policies, as well as any air quality maintenance areas would have to be incorpo-
               rated.into the CZM plan.
<pb n="75" />

                                                   59

                   e. Federal Power Commission
                   The Federal Power Commission (FPC),has sole regulatory authority over the
           siting of all nonfederal hydroelectric generating facilities on lands and waters
           subject to federal jurisdiction. The Federal Power Commission was created by
           Congress in 1920 to administer the Federal Water Power Act, now Part I of the
           Federal'Power Act. In 1930, the FPC was reorganizedby@Congress as an independ-
           ent agency.. The  kinds of ener y facilities  under FPC jurisdiction.include
                                          9
           electric generating plants using water from   impoundments and from pumped storage.
           Since these facilities are of relatively low priority to    the study, the role of
           the FPC will not be examined in detail.

                   The licensing procedure employed by the FPC involves five steps; prelimi-
           nary permit to investigate (optional), application for license, FPC review,
           possible hearing and final determination, and construction and operation., Any
           person or entity may apply for a preliminary permit to investigate a potential-
           hydroelectric power site for up to three years. A public hearing may be held at
           this point if sufficient public   interest is expressed. The application for a
           license includes the following  considerations: the extent of water and land
           rights, the lands owned,  the right to sell power within the State, the effect of
           a project's operation  on water use and quality, the recreation possibilities
           of the site area, the  impact on fish and wildlife, the project's achievement of
           the comprehensive development of.the waterway, the evidence of project's optimum
           utilization of its power resources, the preservation.of scenic and aesthetic
           values, and general environmental considerations.
                   Review of the application by FPC involves   notification in the   Federal
           Register and in local newspapers,,consultation by   applicant with the U.S.. Fish
           and Wildlife Service, Bureau of Outdoor Recreation.  and appropriate state agencies.
           One of the major evaluation criteria.is the effect   of the proposal on the over-
           all regional ener-gy system. Following application   review, a hearing may or may
           not be held by the FPC and-should it be held, the-hearing examiner renders an
           initial decision that is reviewed and either supported or rejected by the commis-

           sion. Finally, the FPC monitors construction and compliance with the terms of
           the license.

                   in addition to its licensing authority over hydroelectric facilities, the
           FPC proposes in Docket No. RM76-38 to.amend sections   of the Regulations of the
           Federal Power Act and the Natural Gas Act to comply with the requirements of
           Section 307(c)(3) of the Coa stal*Zone Management Act. The Coastal Zone
<pb n="76" />

                                                       60

               Management Act affects the regulatory,responsibilities of the   FPC in the follow-
               ing areas:
                          Licensing of hydroelectric projects under Section 4(e) and 15 of-the

               Federal Power Act;

                       9 Ordering interconnection of electric transmission facilities under
               Section 202 of the Federal Power Act;
                       a Authorizing international transmission of electricity under Section
               202(e) of the Federal Power Act and Executive Order No. 10485;
                       e Authorizing import or export of natural gas under Section.3 of the

               Natural Gas Act; and
                         'Certification under Section 7 of the Natural Gas Act.

                       f. U.S. Army Corps of Engineers
                       The involvement of the U.S. Army  Corps of Engineers in  energy facility
               sit ing is primarily associated.with construction activities in  navigable waters
               of the United States. Under authority of Section 10 of the Rivers and Harbors
               Act of 1899.(33 U.S.C. 403) each utility and corporation must obtain a permit
               from the Corps for any energy facility-related construction activity,in navigable
               water, including intake and outfall pipes, bulkheads, piers, and other structures.
               Since permits issued for such facilities.often constitute a major federal action
               significantly affecting the quality of the human environment, an environmental
               impact statement must be prepared in accordance with NEPA. Due to the fact that
               Section 10 permits are often the only major federal involvement in fossil-fueled
               electric generating plants and refineries, the Corps is the lead agency under
               NEPA for such facilities. Nuclear plants must also obtain permits for construc-

               tion in navigable waters, but the Corps has no   other involvement in these
               facilities beyond granting permits. Other kinds.of.energy facilities, such as
               port and terminal facilities, in the Great Lakes coastal zone have also been
               covered by NEPA under the Section 10 permit.program. [158, 199].
                       Although'the Corps has no authority or mandate to engage in the full
               range of energy facility siting regulation, it is required to consider nonnavi-
               gational aspects of proposals covered by the Section 10 permit system [4561,.
               This judicial interpretation was based on the mandates of NEPA and the Fish and
               Wildlife Coordination Act (16 U.S.C. 661 et seq.,,as amended), the latter of
               which requires the Corps to consult with the U.S. Fish and   Wildlife Service and
               the head of the Appropriate s.tate fish and wildlife department with regard to
               Section 10 permit applications [4561.
<pb n="77" />

                                                  61

                   g.  Federal Aviation Administration (FAA)
                   The FAA is concerned with all hazards to aircraft. Tall structures such

           as meteorological towers or cooling towers must be lighted in accordance with
           FAA recommendations. Any structure@over 200 feet tall (generally any cooling
           tower or smoke stack) requires notification of,the FAA. If the proposed struc-
           ture falls within the restricted zone around an airport as described in Federal
           Avaiation Regulation 77, the request for permission to construct is routed to
           various airlines and the airport management for comment. If a hazard is
           determined, the'FAA will seek to have permission to construct denied by the
           appropriate state or federal agency. Such hazards are generally considered in
           the planning.of facilities and FAA involvement is rarely necessary.'

                   h. Coast Guard (CG)
                   The Coast Guard is responsible for investigating oil pollution incidents,
           for assessing penalties for violations of,Sec'tion 311: of the Federal Water
           Pollution Control Act-, and for oil removal in coastal waters. Coastal waters in
           the Great Lakes are generally the lakes, bays, marshes, and rivers inland to the
           point where commercial navigation does not'exist. The Coast,Guard would neces-
           sarily become involved in 4 nuclear incident which threatened those who use the
           Great Lakes through issuing warnings by radio, vessel and aircraft or by conduct-
           ing any other action the Coast Guard is qualified to perform. The Coast Guard is
           also concerned with hazards to navigation. Lights must be placed on structures
           ina navigable  waterway, according to Coast Guard regulations. Such hazards may
           include dikes or submerged intake structures associated with an energy facility.
          .Decisions as to which structures are to be lighted are at the discretion of the
           Coast Guard. Permits for such construction are under the purview of the Corps
           of Engineers (see Sect. f. above)

                   i. Federal Energy Administration (FEA)
                   The Federal Energy Administration (FEA), created by the Federal Ene rgy
           Administration Act of,1974, has very little to do with the siting of energy
           facilities., The enabling Act.deals with general energy considerations and does
           not specifically address energy facility siting [462].
                   Under Section 10 of the Energy Supply and Environmental Coordination Act
           of 1974 (ESECA) the FEA is,directed to weigh the environmental effects of the
           use of coal in existing power plants against the savings of petroleum and natural
<pb n="78" />

                                                     62

             fuels-,that,could be achieved by converting to coal. Following this analysis,
             the FEA Administrator must issue orders requiring conversion from oil or gas to
             coal, where desirable, by plants that have the conversion capability. Section
             119,(b) of the Clean Air Act was amended by ESECA to permit the continuing use of
             coal by.facilities that have.converted.
                    Another ESECA provision directs the FEA Administrator to require'that all
             new fossil-fuel electric generation plants be designed and constructed to allow
             the burning of coal as the primary fuel source. Enforcement of this provision,
             as well as the decision to convert an oil- or gas-fired power plant to a coal-
             fired plant, is contingent upon the availability of,coal, the adequacy of the
             coal transportation system, and the maintenance and reliability of power service
             (4631.

                 2. GREAT LAKES STATES

                     This section describes energy facility siting regulations in the eight
             Great Lakes states. The regulatory processea are.discussed in terms of their
             general approach to the issue, requirements-for disclosure of long-range plans
             and forecasts by applicants for site certification, provisionsfor public partici-
             pation in the siting process, the procedure,by which sites are certified, provi-
             sions for the acquisition of sites, and@provisions for financing the siting
             regulation process.
                     An exception to this outline.is-found in the description of the program
             in New,York state. It was felt that adetailed description of some aspects of the
             New York program would provide an interesting example of a comprehensive, sub-
             stantive.program for regulating power plant siting.

                     a. Illinois

                          (1) General Approach
                     Illinois has not established special.policies or procedures that    relate
             to the siting of energy facilities. Utilitie4s are regu  Ilated by the Illinois
             Commerce Commission, which has recently extended its area of concern beyond cost,
             safety and reliability considerations. The Illinois Pollution Control Board has
             authority to determine and implement environmental quality standards and through
             this responsibility has a major impact on the location and operation of energy
             facilities. The Illinois Environmental Protection Agency is also involved, as
             are several other state agencies to some extent. Local governments retain control
<pb n="79" />

                                                 63

           over siting through zoning and bui lding codes, and several local authorities may
           also be involved. Electric and natural gas'utilities, and oil and gas pipelines
           are subject to Commission, re gulation,'except those owned or operated by a
           political subdivision or municipal corporation. Electric cooperatives are
           subject to limited jurisdiction.

                       (2) Long Range Plans and Forecasts
                   Long range plans and forecasts are not required in Illinois.

                       (3)  Public Participation
                   The Illinois Commerce Commission holds public hearings on all power
           plant licensing cases.

                       (4) Certification Procedures

                   The Illinois Commerce Commission is responsible for issuing both a
           "Certificate of Convenience and Necessity" and a "Section 50 Order" which permits
           a utility to construct, operate and maintain a facility. The hearings on the
           certificate and the order are open to the public.
                   Permits must also.be obtained from several other state and local agencies@
           The state Environmental Protection Agency administers the permit and certification

           programs for air and water pollution control. Power plants must have permits for

           any permanent fuel combustion equipment and for thermal, chemical and sewage
           discharges. Other state agencies with license or permit functions associated
           with energ facilit' siting are listed in Table 3.
                     y        y
                   Local governments retain.control over local zoning and building codes,

           and have direct impact on facility siting. Other,local authorities who may
           require permits include the building inspector, the county or township road
           authority, the fire department, and the local health authority. Furthermore,
           there are over twenty kinds of local agencies exercising regulatory authority
           over water use,.many of which enjoy' permit granting authority.

                       (5) Site Acquisition
                   The Section 50 Order issued by the Illinois Commerce Commission usually
           includes explicit authority to acquire private property by eminent domain.
<pb n="80" />

                                                       64

                           (6)' Financing
                      There are no specific provisions for funding the work associated with
              energy facility siting regulation in Illinois.

                                                   TABLE 3

                        MAJOR PERMITS REQUIRED FOR POWER PLANT SITING IN ILLINOIS

             .AGENCY                     LICENSE OR PERMIT                  AUTHORITY

              Dept. of Public            Construction permit or             Ill. Rev. Stat.
              Works and Bldgs.           intake and discharge               Ch. 19 Sect. 52 et.
              Division of Waterways      flumes                             seq. (1969)

              Dept. of Mines             Permit to drill water wells        Ill. Rev. Stat. Ch. 104
                                                                            Sect. 62 et.seq. (1969)

              Illinois EPA               Permit to discharge sanitary       Ill. Rev. Stat.
                                         waste during construction          Ch. 111-1/2 Spct.1001
                                                                            et.seq. (1970 Supp.)

              do.                        Permit to install auxillary        do.
                                         boiler heating systems.

              Commerce Commission        Certificate of Public              Ill. Rev. Stat.
                                         Convenience and Necessity          Ch. 111-2/3 Sects.
                                         authorizing and directing          50 and 55 (1969)
                                         construction facilities

              Dept. of Highways          Permit for transmission            Ill. Rev. Stat.
                                         lines to cross highways            Ch. 121 Sect. 1-101
                                                                            et. seq. (1969)

              Dept. of Aeronautics       Permit to construct
                                         meteorological survey
                                         tower.

              Dept. of Public  Health    Special, license for               Ill. Rev. Stat.
                                         radiation-installation             Ch. 111-1/2 Sect. 211,
                                                                            et. seq.
<pb n="81" />

                                                    65

                    b. Indiana

                        (1) General Approach

                    Indiana does not have a comprehensive program for energy facility siting.
           Responsibility for approving a power plant is divided among several agencies
           within the Department of Natural Resources, the Stream Pollution Control Board,

           the Air Pollution Control Board, the Environmental Management Board, and the
           Public Service Commission (PSC). However, regulation of siting,is largely
           indirect through these several regulatory agencies. The power of,eminent domain
           resides with the utilities for acquisition of power plant sites and transmission

           line corridors.

                        (2) Long Range Plans and Forecasts
                    There are no provisions for utility disclosure of long range plans or

           forecasts in Indiana.

                        (3) Public Participation
                    Meetings of regulatory bodies are open to the public. A pollution
           control board or other regulatory bodies may choose to hold public hearings.
           State citizens who oppose a permit granted by a regulatory body have been granted
           standing under a 1971 state   law. Citizens may initiate agency review and/or

           judicial review of the permit.

                        (4) Certification Procedure
                    FaciIlity certification is under the purview of the PSC. 'Environmental
           considerations are the responsibility of the DNR and the Environmental Management

           Board. Both a construction permit and an operating permit are required from
           b'oth the Stream Pollution Control Board and the Air Pollution Control Board,
           agencies within the Environmental Management Board. Permits are required from
           the DNR for any construction in the floodway of a river, for water withdrawal
           from a navigable stream or from Lake Michigan, and for inter-basin diversions.
           Site selection is the prerogative of each utility within these constraints.

                        (5) Site Acquisition
                    Utilities have the right to exercise eminent domain to acquire sites.for

           their facilities.
<pb n="82" />

                                                     66

                          (6). Financing
                      The Stream.Pollution Control.Board charges a fee for outfall  permits.
              Ifthe discharge.is less than  50,000 gallons per day the fee is $10.00. If the
              discharge is greater than 50,000 gallons per day the fee is $100.00  forthe first
              outfall and $50.00 for each additional outfall.

                      In addition,.if plant construction requires the removal of sand   and
              gravelor other minerals from the bed of Lake Michigan, a yearly fee of   $50.00
              is assessed by.-the Department of'Natural Resources plus a charge of $.10 per cubic
              yard of sand and gravel removed from, or filled over in Lake Michigan.

                      C. Michigan

                          (1) General Approach
                      The State of Michigan presently has no legislation directly governing the
              siting of energy facilities. The regulatory framework that is currently employed
              is best described as traditional utility regulation. Most of the factors related
              .to the geographic siting of energy facilities in Michigan are addressed at the
              local level through land use control techniques such as zoning, and building
              codes. However, a considerable degree of state authority is exerted over facility
              certification through the implementation of various envirorimental protection and
              natural'resource management programs. The thrust of this general approach is to
              influence siting indirectly by insuring compliance with various environmental

              protection policies. In brief, emphasis in the existing regulatory mechanism is
              pl,dc ed on facility certification instead of alternative site evaluation and

              selection.

                      A number of statutes exert at least some influence on the siting of
              ener gy facilities in Michigan. The Shorelands Management and Protection Act of
              1970, which predated the Federal Coastal Zone Management Act of 1972, calls for
              the''control of environmental and high risk erosion areas situated within 1000
              feet of the ordinary high water mark of the Great Lakes. Flood hazard areas are
              also covered and are not limited to the 1000 feet criterion. Authority for
              implementation of this program rests primarily at the local level. The Michigan
              CZM,Program is being built primarily around this state Act.
                      Another element of environmental policy in Michigan that affects energy
              facility siting in the coastal zone is the Great Lakes Submerged Lands Act. This
              Act established a permit program for construction activities in navigable waters
<pb n="83" />

                                                   67

           that is somewhat similar to the permit system required by Section 10 of the
           Rivers and,Harbors Act of 1899, administered by the Corps of Engi   neers,.
                   A statute that could influence energy facility siting in inland areas
           ,is the Michigan Natural.Rivers Act of 1970. Under this Act, segments of the
           state's rivers that meet certain criteria may be designated as areas    that Warrant
           statewide concern and management. This Act provides for mandatory local zoning
           of corridors of the:river,s included,-in the program. It is unlikely that4n
           energy facility would.be sited in close proximity to a   river included in this

           program.

                       (2) Long   Range Plans and Forecasts
                   At present, no formal mechanism exists for a state role in long     range
           energy facility planning and demand forecasting. Traditionally, this has been
           performed by the private sector.. Recently, the Public Service Commission has
           requested that.the electric utilities voluntarily disclose the details of'their
           projected capital improvement  expenditures over the next ten years for electric
           generating plant expansion  and for air and water pollution control   equipment
           installation.- Disclosure of this information allows,at least some    evaluation
           of planned,siteJocations.    Cooperation,by the utilities has aided   this process.
           However, public involvementin   the early stages of alternative site   evaluation

           and selection remains limited.

                   The Michigan.Energy  Administration has  recently begun to look at.a  broad
           range  of problems and needs associated with future energy production   in Michigan..

                       (3)  Public  Participation
                   Public invol vement in energy fa.cility,siting decisions occurs   primarily
           in the public hearings  concerning permit and license applicat  ions required by
           state and l,ocal governments. State  requirements areloutlined   in the next section.
           Hearings are also held On the utility  rate regulation process   administered by
           the Public.Service Commission., In  the event that  an environmental impact state-,
           ment were.,prepared on a proposed siting pursuant  to Michigan's environmental
           impact review program (as discussed below), hearings would be held and public

           input would be solicited.,

                       (4) Site Gertilfication

                   Michigan does not  have widespread  authority to override local governments
<pb n="84" />

                                                        68

              in siting decisions. Thus, energy companies must obtain all necessary clear-
              ances at the local level as well as at the state and federal levels. In accord-
              ance with existing State of Michigan and U.S. federal legislation, a number of
              permits are required to site an energy facility. The Environmental Protection
              Branch, of the Michigan Department of Natural Resources is in charge of imple-
              menting environmental protection policies through the enforcement of the      permit
              requirements. 'Table 4 lists the principal permit programs that apply to energy
              facilities in Michigan.

                                                     TABLE 4

                          MAJOR PERMITS REQUIRED FOR POWER PLANT SITING IN MICHIGAN

                                                     Termit Required                Authority

                    Watef Resources                Nation Pollutant               Mich. Act 245,
                      Commission                   Discharge Elimination          P.A. 1929, as
                                                   System (NPDES) permits         amended
                                                   for all point source dis-
                                                   charges to surface waters

                    Water Resources                Permit for all discharges      Mich. Act 245,
                      Commission                   to groundwater                 P.A. 1929, as
                                                                                  amended

                    Water Resources                Soil erosion and sedimenta-    Act 347, P.'A. 1972
                                                   tion control permit

                    Water Resources                Permit to erect a structure    Act 247, P.A. 1955
                      Commission                   in or alter the flow of
                                                   navigable water (similar to
                                                   Corps of Engineers Section 10
                                                   permit)

                    Water Resources                Permit to physically alter     Act 346, P.A. 1972
                      Commission                   inland lakes and streams.

                    Air Pollution Control          Permit to install source       Act 348, P.A. 1965
                      Commission                   of air emissions               as amended

                    Air Pollution                  Permit to operate source       Act 348, P.A. 1965,
                      Control Commission           of air emissions               as amended

                    Resource Recovery              Permit to dispose solid        Act 366, P.A. 1974
                      Commission                   wastes
<pb n="85" />

                                                69

                  As mentioned above, Michigan has adopted a statewide process of-environ-
          mental impact assessment. This process, which was created by  Executive Order
          1974-4, is applied to major state actions that significantly affect the quality
          of the human environment. Although this process has not been routinely applied
          to energy facilities, coverage could be extended to include these facilities

          since the statelicenses, or permits that are invariably required could-be defined

          as major state actions requiring an environmental assessment.

                      (5)  Site Acquisition
                  The acquisition of sites for energy facilities is usually accomplished by
          the private sector through voluntary purchase on the market.,@Although the

          electric utilities have the authority to exercise the power of eminent domain for
          site acquisition, subjec,t to approval by the Public Service Commission, this
          authority Is rarely used.

                      (6) Financing
                  The existing energy facility siting regulatory mechanism is funded through
          the normal budgetary process. Modest fees must be submitted with some of the

          permit applications to cover certain costs.

                      (7) Power  Authority Proposal
                  A recent study of electric power generation in Michigan warrants.attention

          in this discussion. In 1975 Governor Milliken issued Executive  Order 1975-4

          which established the Governor's Advisory Commission on Electric Power Alterna-
          tives. In his charge to the commission the Governor identified some of the-major
          institutional problems associated with the provision of an adequate supply of

          electric power:

                  Traditional regulatory practices simply will not.be adequate to
                  solve the enormous and complex problems of the electric utility
                  industry in Michigan. The process does not react fast enough to
                  provide sufficient relief@given the rapid pace of developments
                  in the national economy. In addition, regulation may create dis-
                  incentives to economic efficiency. Yet, even though the system
                  has been and will continue to be strengthened, it does not.pr.ovide
                  regulators with@sufficient control to rectify the problems...
                  The State of Michigan must act now to examine other alternatives
                  to the existing regulatory structure. The state must insure the
                  availability of an adequate supply of power at an affordable price.
                  The financial condition of Michigan's major utilities must be
                  improved or the state will in the very near future be faced.with-
<pb n="86" />

                                                   70

                     a-the indefinite deferral of all major construction;
                     b--the termination of environmental and safety'programs;
                     c--the inability to serve new residentiall commercial,'and
                     industrial customers;
                     d--the deterioration of existing service [457].
           'Specifically, the Commission was directed to:

                     a. examine the general trends in the rates of growth of the demand
                     for electric energy both in the nation and in Michigan; ...assess the
                     accuracy of utility industry and.state government projections of such
                     electric energy demand growth; ...and
                     b. examine all of the feasible alternatives that will provide the
                     consumers of Michigan with an adequate supply of electric power,
                     ...specifically including establishing a Michigan Power Authority
                     to engage in the financing, construction and operation of new..
                     generating or other facilities, establishing a program of insurance
                     and guarantees on the state level to bring about the lower cost of
                     financing electric utility debt, and urging some-form of federal
                     financing support [6mphasis added] [4571.

             The final,report of the Commission was issued in August, 1976.   The foremost
             recommendation was the establishment of the Michigan Power Authority (MPA).   The
             recommendations of the commission address many of the problems and needs identi-
             fied throughout this study, and the reader is referred,to the.Final Report of the
             [Michigan] Governor's Advisory Commission on Electric Power Alternatives [457]
             for further information on this concept.'

                     d. Minnesota

                         (1) General Approach
                     The Minnesota Power Plant Siting Act was passed in May, 1973 to provide
             for the siting of power plants and the routing of transmiss'ion@lines under
             authority of the Environmental Quality Council (EQC). The state also   has an
             Energy Agency created in March, 1974, which has authority tb'issue certificates
             of need for energy facilities. The Environmental  Quality Council is composed  of
             the heads of seven state agencies (including Energy), a representative of the
             Governorts Office, andfour public members appointed by the Governor. The
             council has additional responsibilities under the Subdivided Lands, Critical
             Areas and the Environmental Policy Acts. Local zoning and land use control
             .regulation are preempted by EQC site approval. Aggrieved partiesmay appeal

             council decisions in district court.
<pb n="87" />

                                                  71

                       (2) Long-Range Plans and-Forecasts

                   Public utilities, either individually or in   concert, must submit biennial
          forecasts covering the subsequent 15-year period. The forecasts must include:
          tentative descriptions of size, type and general location of power plants and
          transmission lines; a statement of projected demand for electricity and the
          underlying assumptions used in its calculation; an estimation of capacity required'
          to meet this demand; and a description of the relationship of each utility to each
          other and to power pools.
                   Annual five-year plans for facility development must also be submitted
          by utilities. These plans are to include identification of a tentative site and
          at least one alternat ive, with a preliminary indication of the potential impact
          of planned facilities on the existing environment and how such impacts may be

          avoided or minimized.

                       (3) Public Participation
                   There are four members of the public on the 12-person EQC, and    the..si,ting
          Act includes several provisions for additional public input. The process begins
          with identifying the criteria to be used for selecting suibable sites and corri-
          dors for electric power facilities. Public hearings are required for the develop-
          ment of these criteria. An annual public hearing is also held in order afford
          interested persons an opportunity to express their views regarding the inventory
          of potential sites or any other aspect of the council's activities, duties or

          policies.

                   The Act stipulates that the council appoint advisory committees comprised
          of a majority of public representatives. Such committees include represen     tatives
          of the utilities, the regional council, and any county or municipality whi    ch is
          host to a proposed site. The Act requires additional public participation beyond
          public hearings and advisory committees,   but is not specific as to the  nature of

          this participation.

                       (4) Certification Procedure

                   Pursuant to the Power Plant Siting Act, a set of criteria has been
          developed to establish  an inventory of potential sites for the generation and
          distribution of electric power. The actual inventory of sites is in the final
          stages of development at this writing and will be available in the near future.
<pb n="88" />

                                                      72

              Utilities must either select tentative sites from this inventory in its annual
              facility plan or, if selecting a -non-inventory site, set forth reasons for this
              departure and make,an evaluation of the site or route using the established

              cfiteria.

                       Applications for sites and routes are made in a form and manner pre-
              scribed. by the council. The council conducts both studies and hearings on the-
              application and designates a suitable site or corridor for each facility. Such
              designation is made in accordance with the established site selection criteria
              and standards. An approved site or corridor receives a certificate of site
              compatibility'. Time limits of one year for power plants and 180 days for trans-
              mission line corridors are provided. The study and evaluation process includes
              assessments of,environmental impact, direct and indirect economic impact,
              potential b.eneficial uses of waste energy (heat), and an evaluation of alterna-

              tives and irreversible commitments of resources.

                       The process is not a single-phase operation, because the EQC is respon-
              sible only for site certification. Utilities must also obtain permits from other

              agencies as,in the past. Thus, the public service commissions and environmental
              protection agencies retain responsibility for issuing permits and certificates
              for power plant construction and operation.

                           (5)  Site Acquisition
                       The Act provides for the continuance of utilities' rights of eminent

              domain.

                           (6)  Financing
                       An application fee of $500 to $1000 for each $1 million of estimated
              investment and a minimum fee of $5000 are used to cover the-cost of site-specific
              studies. An annual levy based on both kilowatt-hour and dollar sales of electri-
              city is used to finance the general work of the council, including baseline -
              studies, criteria development, inventory preparation and general environmental

              studies.

                       e.  New York

                           (1) General  Approach

                       The-State of New York has established a specific regulatory mechanism
              to deal  with the siting of steam electric generation facilities of greater than
<pb n="89" />

                                                  .73

           50 MWe capacity. This includes coal, oil and nuclear-fueled plants. Article
           VIII of the Public Service Law.created the New York State Board on Electric
           Generation Siting and the Environment. The board was placed in the Department of
           Public Services and is composed of the chairman of the Publ ic'Service Commission
           (who is also chairman of the board), the heads of the Departments of Environmental
           Conservation, Commerce, and Health, and citizens appointed by the Governor on an
           ad hoc basis from the areas of the proposed sites. The board has considerable
           authority to implement the various state laws that apply to the siting of
           electric generation facilities. All aspects of siteand facility approval are
           administered by the board. In the final analysis, all necessary approvals and
           review processes are incorporated into the Certificate of Environmental Compati-
           bility and Public Need, which must be obtained before a  facility of 50 MWe or
           greater can be sited.

                            Long-Range Planning
                   Under the authority of Section.149-b of the New York Public Service Law

           each electric utility must submit an annual long-range plan which includes:
                      a forecast of demand for the next ten years, specifying anticipated
           load duration, including peak loads;
                   e identification of generating capacity to be utilized in meeting such
           demands, including capacity to be provided by others.oln a contractual basis;
                 .0    an inventory of all major facilities operated by members of the

           New York.Power Pool, including the dates for completion, operation and retire-

           ment;
                   0   an inventory of land owned and held for future use As a major steam
           electric generating facility site-,
                   a   anticipated expenditures fox research in the areas of generation
         -and transmission of electricity and.ab.atement and1control of pollution during

           the next year;
                       such additional information as the commission may by regulation
           require to carry out the purposes of this.section.
                   Subchapter E-1 of Chapter I of.The Rules of Procedure outline the
           fladditional information" required by the PSC for long-range planning. The
           utilitie s are required to notify a wide range of public and pri@ate organizations

           and individuals of the filing of the annual report. Following notification, the
           PSC holds one or more public hearings on the annual plan. The   annual plan
<pb n="90" />

                                                     74

              contains four major sections: power demand and'energy requirements, generation
              facilities, transmission facilities, and" research and development.
                      Each plan must document thesummer*and winter peak loads in the service
              area of concern for the previous 10 years and must-provide estimates for the
              current year and for each of the 20 years subsequent to the year of filing. In
              addition,.information is also required on the energy requirements for the time
              frame mentioned above for such uses as residential, small light and power, large
              light and power, corporate uses, street and highway lighting, railroads and rail-
              ways, and other public uses.
                      The plan must also contain a documentation of the methodology used to
              estimate peak loads and energy requirements, including a description of the
              Pconomic and demographic assumptions employed in peak load and energy requirement

              forecasts.

                      Finally, data used in the forecasts must accompany the 'annual plan, and
              each utility is required to describe present and-planned future efforts with
              regard to encouraging energy conservation or to stimulating demand.
                      Under the generation facilities section utilities are required to specify
              in detail the existing and projected generation capacity of their respective
              systems. This section requires a projected timetable of plant completion,

              including the approximate date of application of any permit or license required
              under state or federal law. A summary must be presented of each New York State

              environmental law, rule, regulation or-standard of less than statewide applica-
              bility pertaining to any facility proposed within ten years of the year in which
              the plan is filed.
                      For each facility proposed within  10 years of the plan of concern,
              utilities must provide an estimate of the  capital cost. of environmental control
              facilities and a description of the maj  or design constraints posed by environ-
              mental standards or'site-specific conditions.
                      In terms of site inventory, information is required with regard to:

                      *  the size and location of the site

                      *  any applicable land use standards as contained in zoning regulations
              and master plans
                      *  the changes in land use that would result from construction at the
              proposed site
                      * the probable environmental suitability of   the site for the type of
              generating facility proposed.
<pb n="91" />

                                                   75

                   Finally, the plan must discuss how the availabili.ty of environmentally
          suitable sites,. the location of load centers,   the configuration of the state
          bulk transmission facilities, and the final costs of delivered power have
          influenced the selection of each proposed site.

                      (3)  Public  Participation
                   Public involvement in the decision-making process    is provided by a
          variety of means, including public disclosure of long-range plans by utilities,
          procedural requirements insuring notification of the filing of an application
          for a certificate, and public hearings conducted on long-range plans for site
          development. In addition, local interests are represented on the board as ad
          hoc members from the j udicial district of,the proposed site.

                      (4) Site Certification

                   In New York the certification of the site and of the facility is handled
          by means of the application and approval processes associated with the Certifi-
          c.ate of Environmental Compatibility and Public Need. All permits and.licenses
          related to compliance with environmental protection legislation are handled.
          through the board and are included as part of the applicationfor the certificate.
          Under the authority of Section 149-a of Article V.III of the Public Service Law,
          the board preempts all other state and local authorities     in siting-related
          matters by effectively incorporating theselegal requirements in the.certifica-

          tion process.
                   The decision-making process surrounding site approval is characterized by
          a formal, legal adversary proceeding, at which the various interests present
          testimony on matters related to the proposal of concern. The extensive informa-
          tion obtained in applying for   the certificate supplies much of the basis for, the
          evaluatio n of the proposal. The findings of the board, which may constitute.
          approval, approval with conditions, or. disapproval of the proposed siting, are
          based on the following criteria:
                   * the public need for the facility and basis    thereof
                   9 the nature of the probable environmental impact, including a      speci-.
          ication  of the predictable adverse effect on the normal environment and     ecology,
          public health and safety, aesthetics, scenic, historic and recreational      value,
          forest and parks, air and water quality, fish and other marine life, And     wildlife
<pb n="92" />

                                                      76

                          that the facility represents  the minimum adverse environmental impact,
              considering the state of availabIt technology, the   nature and economics of the'
              various alternatives., the interests of the state  with respect to aesthetics,
              preservation of historic sites, forest and parks, fish and wildlife, and other

              pertinent considerations

                      * that the facility is compatible with the public health and safety
                      * that the facility will not discharge any effluent in contravention of
              the standards adopted by the Department of Environmental Conservation or, in
              case no classification has been made of the receiving waters that the facility
              will not discharge any effluent that will be unduly.injurious to the propagation
              and protection of fish and wildlife, the industrial development of the state, and
              public health and public enjoyment of the receiving waters.
                      9 that the facility is designed to operate in compliance     with applicable
              state and local laws 'and regulations issued thereunder,concerning,   among other
              matters, the environment, public health and safety, all of which shall be binding
              upon the applicant. However, the board may refuse.to apply any local ordinance,
              law, or resolution which it finds unreasonably restrictive in view of the
              existing technology or the needs of or costs to consumers whether located inside
              or outside of such municipality. The board shall,provi.de the municipality an

              opportunity to present evidence in support of such ordinance, law, resolution,

              regulation, or other local actin issued thereunder

                      e that the facility is consistent with long-range planning     objectives
              for electric power supply in the state.
                      e that the facility will serve the public interest, convenience, and
              necessity, provided, however, that determination of necessity for a    facility made
              by the Power Authority of the State of New York@ pursuant.to Se   ction 1005 of the

              Public Authorities Law shall be conclusive on the board; and

                          that the facility is in the public interest, considering   the evidence
              in support of such ordinance, law, resolution, regulation, or other    local action

              issued thereunder.

                      Regulations implementing Article VIII,of the New York Public Service Law
              require that at least two locations (primary and alternate) be evaluated in,
              detail for the proposed facility, or that, in addition to the primary location
              for the proposed facility, an alternate facility at an alternate site mustalso

              be evaluated in detail.
<pb n="93" />

                                                 77

                      (5) Guidelines for Application for Certificate
                   The rules and regulations governing the Certificate of Environmental
          Compatibility and Public Need are highly detailed and cover an extremely broad
          range of factors related to the siting of electric generation facilities.
                   'Each of these categories is broken down into subsections. No attempt
          will be made here to provide an in-depth review of these regulations. The points
          most relevant to this study will be described to the extent possible according

          to the headings that appear in the guidelines.

                           (a) General requirements
                   Provisions are made in this section to insure that the,applicant and the
          board are fully aware of all federal, state and local laws, rules, regulations,
          standards applicable to any apsect of the proposed site.

                           (b) Public need and engineering design
                   The data relevant to demand and supply forecasts as determined in the
          most recent long-range electric system plan are incorporated in the certificate
          application to document the need for the proposed-facility.   Also included is

          information on.engineering design, transmission facilities,  costs of initial
          investment, and costs of generation of electricity.

                         ,.(c) Air quality and meteorology
                   Under this section, the applicant is required to submit. information on

          meteorological conditions at the proposed site. Data are collected for suspended
          particulates, sulfur dioxide, nitrogen dioxide, and other contaminants likely to
          be discharged by the.facility. Data are also collected for other meteorological
          parameters to establish a framework within which to predict impacts of the pro-
          posed facility on air quality.

                           (d) Aquatic ecology
                   In order to assess the effects of.the proposal on aquatic ecosystems, the
          applicant is required to collect data for a period of not less than 12 consecu-
          tive months, ending not more than 6 months prior to the date of application.

          These data are in addition to any data collected by the U.S. Fish.and Wildlife

          Service and -the New York Department of Environmental Conservation. The design,

          operation, and maintenance aspects of the facility are then evaluated in terms of
<pb n="94" />

                                                       78

               the ecological relationships that are likely to be impacted by the proposal. The

               impact areas include:

                       9 physical disruption of bottom sediments

                       9  discharge of,thermally enriched water
                       e  scheduled or unscheduled shutdown
                       e  significant change in dissolved oxygen
                       a  major change in-local current patterns or water movement

                          significant buildup of a toxic material in the sediment
                       0  impingement or entrainment of  any significant life-form.

                               (e) Environmental noise

                       Noise impacts are .evaluated in a fashion similar to that of air impacts.

               Present conditions are determined; construction, operation, and maintenance

               activities are specified; and the associated effects are predicted.

                               (f) Geology and seismology.

                       This section was unavailable, for review.

                               (g) Land use and aesthetics

                       Land use effects are treated in the same manner as air and noise effects.
               The categories of land use effects that must be discussed include the following
               social and economic impacts:

                          the total number of employees and the associated payroll for each year
               of the construction phase and the total number of employees and   associated payroll
               by annual salary levels for the first two years of operation;
                       a the  number of persons to be employed from the local   labor market;
                          the probable impact, if any, of the use of the site   and any associated
               influx of employees upon the sufficiency of police,fire, health, and other
               public services, as well as.housing, educational, and  recreational facilities;
                          the estimated annual amount of municipal or- special district property
               taxes and any municipal or special district user  charges;
                       e the impact of any change in access to   any land as a result of the
               construction, operation, or maintenance of the proposed facility;
                          if there is any plan for using the site area for other than the pro-
               posed facility, the impact of the preemption of that plan by the proposed

               facility; and
<pb n="95" />

                                                79

                     the impact on adjacent land uses, including existing patterns of land
          use and zoning in the locality.

                          (6) Site acquisition

                  State involvement in site acquisition is limited to requiring that

          electric utilities disclose ownership of or interests in prospective future
          sites. Site 'acquisition is usually achieved through.voluntary negotiation.

                          (7) Financing
                  Applicants are required to submit an application fee of $25,000 to the
          board which may be distributed to the local jurisdictions affected by the pro-
          posed siting if they can demonstrate a need for the funds. These funds are

          intended to defray expenses incurred by local interests in providing expert
          testimony in their behalf at the formal hearing. Unused funds are returned   to
          the applicant.

                  f. Ohio

                      (1) General Approach

                  The State of Ohio has modeled its power plant siting program after that
          of'New York. Although some differences exist, the general approachesare the
          same. The regulatory mechanism has been fashioned into a one-stop process. The
          Ohio Power Siting Commission (PSC) is the lead agency through which the process
          operates and.is composed of the heads of the Departments of Environmental Protec-
          tion, Health, Economic and Community Development, and the Chairman of the Public
          Utilities Commission. In addition, an engineer appointed from the general public
          also serves on the PSC. It is noteworthy that in Ohio, as opposed to New York,
          the responsibilities for natural resource management and environmental protection
          are performed by separate agencies, the Ohio Department'of Natural Resources
          (ODNR) and -the Ohio Environmental Protection Agency (OEPA). Although ODNR is not
          represented directly by membership on the PSC, it is extensively involved in the
          review process of site proposals.
                  Covered by this program are electric generating facilities, including
          oil, coal, and nuclear power plants of greater than 50 MWe capacity, electricity
          transmission lines of greater than 125 kV capacity, gas transmission lines and
          associated facilities capable of transporting gas at greater than 125 pounds per

          square inch.
<pb n="96" />

                                                     80

                       In order to-site a facility of the type covered, a utility must first
               obtain a Certificate of Environmental Co mpatibility and Public Need from the

               OPSC. All permit and license requirements are incorporated in the certificate
               application'process.

                          (2) Long-Range Planning
                       Chapter 4906.15 of the Ohio Revised Code establishes the requirement
             .that utilities prepare annual forecasts of electric power and natural gas demand
               and supply. The PSC has promulgated detailed guidelines for.these forecasts.
               The electric generating and transmission facilities forecast is composed of three
               parts: (1) electric power demand forecast, (2) resource,fore.casts and site
               inventories for electric generating plants and (3) resource forecasts and site
               inventories for transmission facilities. The regulations include An appendix
               which outlines various forecasting methodologies which may be employed by the
               utilities. The time frame that must be employed for data analysis includes:
                       0 the past five years' actual historical data
                       a the current year forecast (both actual and projected)

                       0 a ten-year forecast of loads, both in terms of energy and peak

               demands, as appropriate.

                               (a) Demand forecast

                       The utilities must provide the following:

                       0 a description of the extent to which the reporting utility coordinates

               its load forecasts with those of other systems, such as affiliations in a holding
               company group, associated systems in a power pool or other coordinating organi-
               zation, or other neighboring systems
                       e a description of the manner in which such forecasts are coordinated

               and of any problems experienced in this coordination
                       e a brief descriptib.n.of any computer modeling, demand forecasting,
               polls, survey or data gathering activities engaged in during the past year
               (exclusive of normal operations), including cost data, manpower requirements and
               significant findings.
                       In order to facilitate the analysis of forecasts, Ohi6 has established 11
               service districts, and 15 planning regions for the state. Some elements ofthe
               demand forecasts are linked to this breakdown. The output of the demand forecast

               is composed of five parts:
<pb n="97" />

                                                81

                  * a forecast of the energy demand in'the utility's service area
                  @ a forecast of system energy demand in Ohio by industrial sectors
          only

                  e a separate  ten-year forecast of energy demand for that part of each
          state planning region included in the reporting utility's service area
                  * a forecast  of system peak demand levels for winter and summer

          seasons

                  * a forecast of annual peak loads for each major load center.
                  Another requirement of the annual ten-year forecast is the documentation
          of the approach used in the forecast, the major factors of which are the metho-
          dology, the data base,.and the assumptions employed. Particular attention is
          paid to the use of assumptions in the forecasts, and those related to the
          following points must becovered:
                  o relative prices and availability of alternatives to the use of

          electric energy
                  0 pricing policy, including:

                     - alternative rate structures

                     - promotion of consumption or conservation

                     - predicted future price behavior
                     - impact of price changes on quantity demanded.
                  o  growth in the economy
                     advertising policy-assumed
                     availability and potential development of primary energy sources
          (coal, oil, hydro, nuclear, solar, wind, etc.) used in generating electricity
                  o other assumptions critical to forecast techniques-or company operating

          procedures.

                          (b) Resource forecasts and site inventories for, electric
                               generating plants

                  This section of the overall forecast is intended to provide documentation
        .of estimated future resource requirements and of the prospective sites under
          consideration by the reporting utility. The major items that must-be addressed

          are outlined below:

                     a description of the generating capacity of the existing system
                     a ten-year resource.plan which identifies the requirements of new
          facility construction to meet projected loads (broken down on an annual basis)
<pb n="98" />

                                                       82

                       e  a description of the rationale for planned expansion
                       e  an inventory of prospective sites for generating plants that are
               subject to the certification process.

                       With regard to this last item, utilities must provide a detailed site
               description, ecological data, a description of likely socio-economic impacts, and

               a brief discussion of alternate sites.

                           (3)- Site Certification

                       In the Ohio program site certification and environmental certification of
               the facility are combined into one process. The OPSC administers all state and
               local laws, permits and licenses that apply to a proposed energy facility covered
               by the program. The OPSC preempts the authority of all other state and local
               agencies and units of government in the regulation of siting.
                      'As required by Section 4 of Ch apter 4906 of the Ohio Revised Code,
               utilities must obtain a Certificate of Environmental Compatibility and Public
               Need before siting an electric generating facility. In reviewing an application

               for a certificate the OPSC must determine:

                       * "the basis of the need for the facility
                       9 the nature of the probable environmental impact
                       * that the facility represents the minimum adverse environmental
               impact, considering the state of available technology and the nature and economics

               of the various alternatives, and other pertinent considerations
                       * in-the case of an electric transmission line, that such facility is
               consistent with regional plans for expansion of the electric power grid of the
               electric systems serving this state and interconnected utility systems; and that
               such facilities will serve the interests of electric system economy and reliability
                       e that the facility will comply with Chapters 3,704., 3734., and 6111. of
               the Revised Code and all regulations and standards adopted thereunder
                       9 that the facility will serve the public interest, convenience, and
               necess ity." (ORC, Section 4906.10)
               The Rules and Regulations of the OPSC include an extensive section on the comple-
               tion of an application for a certificate. The relevant points under each major
               heading of this section of the guidelines will be covered.

                                (a) Justification of need

                       This discussion must include a description of the relationship of the
<pb n="99" />

                                                 83

          proposed site to the most recent ten-year forecast And an analysis of the
          alternatives considered. This section also provides for a project schedule which
          describes the time staging of the procedural  requirements and of plant construc-

          tion.

                           (b) Technical data

                  In order to fully evaluate the proposal, certain detailed information is
          required. In terms of the site itself, data must be collected on geography and
          topography, geology and seismology, and hydrology.. Al so required are data on site
          layout and preparation, and on generating, cooling and emission control equipment
          to be employed.

                           (c) Environmental data

                  This section of the certificate includes a detailed environmental assess-

          ment of the proposed site. As used in this context, "environmental" generally
          refers to the poilution-related@asp*e'cts' of environmental impacts. The data
          requirements are listed in detail, and the general assessment headings include
          air, water, and solid waste, radioactive emissions, noise, and resources.

                           (d) Social  and ecological impact of the proposed generating
                               facility
                  The major headings under this section include  health and safety impacts,
          ecological impacts, impacts on resources, economics, land use and community
          development, and cultural@'effects.

                           (e)- Permit requirements

                  As mentioned above,  the various permits and licenses that must be
          obtained by the applicant in order to site an electric generation   facility are
          incorporated into the application process for the certificate. A    list of the
          major permits is given in Table 5.

                      (4) Public Participation
                  The Ohio program provides a variety of opportunities  for public involve-
          ment. All information submitted to the OPSC by the electric   utilities (except
          proprietary information) is available for,public review. Widespread notification
          is made of applications for certifi-cates. In addition, the annual ten-year
<pb n="100" />

                                                         84

               forecast report meetings, the pre-application review conference (if held), the
               formal hearing on the certificate, and other meetings of a non-proprietary nature
               are all open to the public.

                                                       TABLE 5

                               MAJOR PERMITS REQUIRED FOR POWER PLANT SITING IN OHIO

                  Resource        Ag.!!-_ncy         Pe it Required                  Authority

                  Air          Ohio EPA        Permit to install source         Ohio Revi sed' Code,
                                               of air emissions                 Chapter 3704.03

                  Air          Ohio EPA        Permit to operate source         Ohio Revised Code,
                                               of air emissions                 Chapter 3704.03

                  Water        Ohio EPA        Permits for all discharges       Ohio Revised Code,
                                               into receiving waters            Chapter 6111.03
                                                                                (NPDES permit)

                  Solid Waste Ohio EPA         Permit to dispose of             Ohio Revised Code
                                               solid wastes                     Chapter 3734

                            (5) Certification Procedure

                        A well-defined application and review procedure has been developed for
               electric generating facility siting in Ohio. The procedural guidelines will be
               described briefly according to the major    topical headings.

                                  (a) Le'tter of intent

                        In order to provide adequate lead time for the evaluation of the proposed
               siting and to insure the proper course of action, the Ohio P6wer Siting Commis-

               sion requires that a letter of intent be filed at least one year in advance of
               the filing of an application for a Certificate of Environmental Compatibility and
               Public Need. In the letter, the utility may request waivers from certain OPSC
               rules and regulations. The OPSC must respond to the letter of intent within
               sixty days, making any appropriate comments.

                                  (b) Pre-application conference
                        The purpose of this conference is to identify environmental, social, and
               public factors that could result in disapproval of a specific site, before signifi-
               cant time and monetary-resources have been expended. The pre-application hearing
               is also open to the public, and may be held before or after the filing of the

               letter of intent.
<pb n="101" />

                                                   85

                            (c)  Filing of application

                  The next major step is the filing of the application for the certificate
          with the OPSC, which then has 60 days to determine the completeness of the appli-
          cation. During this period, appropriate state agencies, principally the ODNR and
          the OEPA, review the application. Major substantive factors that do not appear
          to be addressed in the application are identified at this point. The utility
          then responds to these 6omments and.resubmits its application, after which the
          OPSC has 60 to 90 daysto circulate the application for review and schedule a
          public hearing, at which the formal, legal.proceedings take place. During this
          period, review comments by the ODNR, the OEPA, the PUCO and other agencies are
          solicited by OPSC. The OPSC has established specific certificate evaluation,
          procedures and guidelines, which specify the statutory authority of the review,
          the particu lar agency and staff.member responsible for the review, and the pri-
          mary focus of the review. The results o  ,f this-substantive review form the basis
          of the testimony presented at the formal hearinv-.. At this point, the certificate

          is either approved, approved with conditions, or denied.

                       (6) Site Acquisition
                  The State of Ohio is not involved  in the acquisition of prospective sites
          for energy facilities. The private sector   acquires sites primarily through
          voluntary negotiation with landowners.

                       (7) Financing

                  Ohio has established a financial mechanism to,offset the costs of various

          aspects of the.program including review, analysis, evaluation, investigation,
          monitoring, enforcement, etc.
                  The application fee for a power plant is determined by the following

          formula:

                      the product of, $1.10 times the maximum kilowatt electric
                      generating capacity as determined by the name plate rating,
                      plus
                      ten percent of the amount determined above, times
                      the difference between the anticipated year of expiration
                      of the period of initial operation and the anticipated
                      year of commencement of construction.
<pb n="102" />

                                                        86

                         g  Pennsylvania

                            (1) General Policy Approach
                         At present, Pennsylvania does not have legislation that specifically
                addresses energy facility siting.     The regulations and standards of the environ-
                mental protection and natural resource,management policies'form the basis for the
                existing, indirect regulation of siting. The concept of local control of land
                use is deeply imbedded in Pennsylvania, and this will continue'to play a major
                role in future policy development.'
                         In 1970 Pennsylvania passed legislation establishing    the'Departmeint of
                Environmental Resources and charging it with the development     of statewide
                environmental master plan. The Environmental Quality Board is the policy making
                body of the DER and is in charge of master plan development.      The chairman of
                the Public Utility Commission is also a member of the board.      The approach taken
                in the master plan is the identification, policy development,     and management of
                environmental areas of critical   state importance. The general categories identi-
                fied as priority areas include:

                         9 prime agricultural soils
                         e watersheds with high quality streams
                         .0 floodplains

                         * coal resources

                         * areas with limited water supply

                         * clean air resource areas

                         * open space in metropolitan Areas
                         * geologic areas with development constraints.
                These categories generally reflect a land capability approach to environmental
                planning.  The policies developed for the.general critical areas will signifi-
                cantly influence the siting of electric generating facilities as well as other
                types of energy facilities.

                            (2) Site Certification

                         Site certification and facility certification are handled under separate
                mechanisms in Pennsylvania. With respect to site certification, no state approval.
                is required if a  proposed electric generating facility site has been zoned for
                such a use or if  a variance has been granted by the appropriate local governmental
                jurisdiction. Under existing law, the Pennsylvania Pablic Utility Commission
                (PUC) can preempt local regulations and can grant the conditional power of
<pb n="103" />

                                                    87

           eminent domain to utilities.. If the proposed sit    e has not been givenlocal
           approval, the utility can apply to the PUC for intervention. If the PUC deter-
           mines that the proposal is needed.to maintain an adequate supply of electricity,
           it can grant a Certificate of Necessity for the proposal. This gives the utility
           the power of eminent domain to acquire the site and transmission line      rights-of-

           way.
                    With regard to certification of the facility, Pennsylvania has     established

           environmental protection legislation for air and water pollution, soil      erosion
           and sedimentation, and solid waste disposal. The Department of Environmental
           Resources (DER) is the principal agency in charge of the environmental protection
           programs. Table 6 lists the major permit requirements for energy facilities in
           Pennsylvania.

                                                  TABLE 6

                      MAJOR PERMITS REQUIRED FOR POWER PLANT SITING IN PENNSYLVANIA

              Resource        Agency                 Permit Required                  Authority

              Air           DER Bureau of       Permit to install source       Penn. Air Pollution
                            Air Quality         of air emissions               Control Act
                            Control

              Air                               Permit to operate source
                                                of air emissions

              Water         Bureau of Water     Industrial waste discharge     Penn. Clean Streams
                            Quality Manage-     permit                         Act of 1937, as
                            ment                                               amended.

              Water         U.S.E.P.A.          National Pollutant             Section 402,
                            (Authority not as   Discharge Elimination          P.L. 92-500
                            yet delegated to.   System (NPDES) permit
                            Penn. DER)

              Water/Soil    Bureau of Water     Soil erosion control           Penn. Clean Streams
                            Quality Manage-     permit for earth               Act of 1937, as
                            ment                changes greater than           amended
                                                25 acres

              Solid         Bureau of Land      Permit to dispose              Penn. Solid Waste
                Waste       Protection          of solid waste                 Management Act
<pb n="104" />

                                                     88

              The specific requirements under each permit vary according to the type of
              facility and site under consideration. The DER has established regional offices
              to coordinate these permit systems and to expedite procedural matters.

                           (3) Long-Range Planning
                      Long-range planning for electric generating plants and other kinds of
              energy facilities is performed by private corporations. The PUC does require
              that electric utilities demonstrate that an adequate supply of reasonably priced
              ,electricity will be available in the future. Thus, some knowledge is gained of
              possible future sites, but detailed disclosure of specific plans is not required.

                           (4) Site Acquisition
                      The normal site acquisition procedure i,s-one of voluntary purchase by
              private corporations. Negotiation usually is sufficient for acquisition. The
              PUC has the authority to grant the power of eminent domain to electric utilities
              for land acquisition. Although condemnation is used oc..casionally for acquisition
              of transmission line rights-of-way, it is rarely used.for large tracts of land

              for future sites.

                           (5) Public Involvement

                      Public involvement in the siting decision process in Pennsylvania is
              provided mainly through public hearings conducted on.,the various environmental
              .protection permit, applications mentioned above.

                           (6) Financing
                      There do not appear to be any financial mechanisms established to
              facilitate or implement the energy facility siting process in Pennsylvania.

                      h. Wisconsin

                           (1) General Approach
                      .The Wisconsin legislature enacted a power plant siting bill in September
              1975 which provides for the siting of large power plants (over 300 MWe) and high
              voltage transmission lines. The Act does not create a new agency but rather
              assigns responsibilities to existing agencies, especially to the Public Service
              Commission (PSC) and Department of,Natural Resources (DNR). Local ordinances
              which preclude or inhibit installation and utilization of facilities covered by
<pb n="105" />

                                                    89

          the Act are preempted. The Act provides for judicial review of any decision by
          the PSC regarding the advance, plan   or the certification of facilities.

                       (2)* Long-Range Plans and Forecasts
                   Biennial plans are required of the utilities and     may be submitted
          individually or in concert. The plans are to include a       general description of
          facilities and locations planned for the succeeding ten-year period, identifica-
          tion' of possible@alternatives and reasons'for selecting     the proposed facilities
          and locations, a' detailed projection of electric energy     demand and the basis
          thereof, identification' of planned research    projects, and identification of pro-
          grams to discourage inefficient and excessive power use.
                   The utility plans are to be submittedto the'PSC with copies to seven
          other state-agencies and any concerned regional planning commission. These
          agencies are allowed 180 days in which to comment on the pldns. Copies are also
          sent to cities, counties and libraries in proximity to proposed sites and to
          those who request copies. Local governments and members of the public may also
          submit written comments within 180 days. A hearing on the plan will also be held
          within 180 days within the vicinity of the site proposed to be constructed in the
          following three years. At least thirty days prior to the hearing, the PSC must

          prepare a single environmental assessment on all plans submitted by the utilities.
                   Within eighteen r@o@nths of i.ts filing, each plan must either be approved
          or disapproved by the commission. Approval is based on four criteria: provides
          adequate supply, i,s in the public interest, is coordinated with other long-range
          plans and policies, and provides programs for discouraging inefficient and

          excessive power use.

                       (3) Public Participation
                   At least one public hearing is to be held on each utility plan. Several
          public hearings are also held in the vicinity of a proposed site after the appli-
          cation for Certificate of Public Convenience and Necessity has been filed. The
          public is provided access to copies of the utility's plans through county librar-
          ies and is invited to make written comment.on the plans.

                       (4) Certification Procedure

                   At least 120 days before filing an application for a certificate, a
          utility must notify the PSC and the DNR of its intention to file and provide an
<pb n="106" />

                                                     90

               engineering plan showing the location of the proposed facility accompanied by a
               description of the facility including anticipated effects on air and water
               quality. Within 60 days of such notification the DNR provides the applicant with
               a list of all permits and approvals required for the construction or operation of
               the facility indicating which of these would be required prior to issuance of the
               certificate. An optional permit procedure allows the utility to,obtain a single
               permit from the DNR covering all permits and approvals issued by that agency.
                       The certificate is required prior to commencement of construction. Time
               limits of eighteen months for power plants and six months for transmission lines
               are specified for the approval process. The process is to include "as many
               hearings-as practicable." Approval of the certificate is based on: compliance
               with the most recent advance plan, necessity to meet demand, consideration of
               alternatives, environmental considerations, and conformance with orderly land use
               and regional development plans. The PSC issues the certificates.

                           (5) Site Acquisition
                     .Utilities in Wisconsin have the power of eminent domain, but the Siting
               Act restricts the use of this power. A utility may condemn a limited interest
               in real property or appurtenant personal property for purposes of feasibility
               tests and studies under certain restrictions. A utility may not acquire real or
               appurtenant personal property by condemnation until a Certificate of Public
               Convenience and Necessity has been issued for the site.

                           (6) Financing
                       The Act does not provide for the funding of siting regulation procedures.
<pb n="107" />

                                                  91

               3   OTHER COASTAL STATES
                   This section briefly describes energy facility'siting programs in
           selected coastal states outside the Great Lakes.Region. -States were selected
           -for the uniqueness oftheir, approach to the question of energy facility siting.
           All six states have,recently enacted legislation to,@deal directly with this
           issue. California has the only program that specifically relates energy facil-
           ity siting to coastal zone.,management.

                   a. California

                       (1) General Approach
                   The California Energy Resources Conservation and Development Act of May
           1974 provides that state with one of the most,comprehensive energy programs in
           the country. The Act establishes the Energy Resources Conservation and Develop-
           ment Commission (ERCDC), which is comprised of five governor appointees confirmed
           by the senate, two non-voting, ex-officio members, the secretary of the state
           Resources Agency and thelpresident.of the Public Utilities Commission. Conflict
           of interest provisionsare specified in the Act, The commission is charged with
           power plant siting and certification, energy resources.conservation, and"  research/
           development,programs to deal with supply, consumption and conservation of energy.
           The commissionbas sole responsibility for site certification except in the
           coastal zone, where prior approval from the state Coastal Zone Conservation

           Commission is also required.

                       (2) Long-Range Plans and Forecasts
                   Utilities must prepare biennial 5-, 10-, and 20-year forecasts of demand,
           estimated savings through greater efficiency, alternative ways to meet increases
           in demand, siting needs, and the potential for increasing capacity at existing
           sites. The forecasts are to be widely disseminated with comments invited from
           all quarters. The Public UtilitiesCommission submits an independent evaluation
           of each forecast during the four-month review period, after which the ERCDC
           issues a preliminary statewide report on the forecasts. After more review and
           another public hearing, the forecast is incorporated into  the biennial report.
           The report concerns overall energy needs, developments, policies and practices.
           It includes a list of possible sites to meet the 10-yearneed for electricity
           and a 20-year projection of the likely environmental, economic and social impacts
<pb n="108" />

                                                     92

              of continuing present trends, with recommendations for reducing demand, conserving
              energy, and developing potential energy sources.

                           (3) Public Participation

                      Public participation is not only permitted, it is actively sought out.

              An Office of the Public Advisor has been established to insure dissemination of

              information to the public and the notification of interested parties and the
              general public with regard to public hearings and other commission actions"
              This appears to be a unique attempt to,facilitate public particiation and insure
              an open and thorough decision-making process.

                           (4) Certification Procedure
                      A utility proposing to construct a power plant in California must first
              submit a notice of intent to file an application for site certification to the
              Energy Resource Conservation and Development Commission (ERCDC). The notice of
              intent is to include identification of three alternative sites, a description of
              the facility proposed for each site, a preliminary statement of the relative
              economic, technological, and environmental advantages and disadvantages of each
              alternative, and a statement of need and information showing compatibility with
              the most recent biennial report. Of the three alternative sites, at least one
              must be outside the coastal zone. The notice of intent may- also describe phased
              development for a site.

                      Copies of the intent notice are widely disseminated. The ERCDC then

              requests comments from appropriate agencies, including the Public  Utilities
              Commission, from whom a certification of public convenience and necessity may
              also be required,and the Coastal Zone Conservation Commission, from whom prior.
              approval is required for facilities in the coastal zone.
                      Public hearings are begun in the county of the proposed sites in the
              interval from 60 to 90 days after the filing of a notice of intent.   Hearings
              are to conclude within 90 days of commencement. Within 90 days after the con-
              clusion of hearings, the council issues a preliminary report on the notice of
              intent. Thirty days are provided for distribution of the preliminary report and
              another 60 days for written responses thereto. Within 120 days of the issuance
              of the preliminary report, the final report is to be prepared and distributed.
              Public hearings on the final report are to commence within 30 days of its release
              and conclude in another 30 days.
<pb n="109" />

                                                  93

                   Among other things, approval of the notice of intent requires that at
           least two of the three alternative sites and related facility proposals be found
           acceptable.  Approval of the permit with only one acceptable site is possible
           under certain conditions. If no acceptable site is found, but.the need for a
           power plant established, the commission may designate a feasible site and related
           facility, if so requested  by the applicant.
                   The above process  may proceed simultaneously with the processing of an
           application for a Certificate of  Public.Convenience and Necessity by the Public

           Utilities Commission.
                   At least 18 months before the planned commencement of construction, a
           utility must file for certification of a site and related facility found accept-
           able under the process described above. An environmental.impact report is then
           prepared, with the commission acting as lead agency except where the Coastal
           Zone Conservation Commission has jurisdiction. A new round of agency review and
           public hearings-is,initiated with, a -final decisiondue within 18 months of the
           filing for certification. Sites in the coastal zone will not be certified until
           a permit is issued by the appropriate (re
                                                     gional or state) coastal zone commission.

                       .(5) Site Acquisition
                   Utilities have 'the power.of condemnation.   The utility may also be
           required to acquire development rights in a buffer   zone to insure that maximum
           population densities in thearea of the plant would not be exceeded. Maximum
           population densities may be established by the commission to protect public
           health and safety. For a nuclear facility such population densities may be de-
           termined by the Nuclear Regulatory Commission (as successor to the AEC).

                       (6) Funding
                   A surcharge of one-tenth of a mill per kilowatt-hour of electric power
           produced, subject to annual revision, is used to finance the operation of the
           Energy Resource Conservation and.Development Commission. In addition, the filing
           of a notice of inteqt@requires submission of a fee of 1(@ per kilowatt of net
           electric capacity of the largest proposed alternative-within the range of $1,000
           minimum to $25,000 maximum total. Applications for other types of facilities
           (e.g., transmission lines) must be accompanied by a $5,000   fee.
<pb n="110" />

                                                    94

                      b   Maine

                         ,(I) General Approach
                      Due to increasing pressures to-locate petroleum refineries in the coastal
             zone, and for other reasons, the State of Maine has developed its principal state

             land use control program around the siting of large-scale facilities involving
             more than-20 acres of land or water. This includes all energy facilities which
             meet the size criterion. Although Maine does not specifically address energy
             facility sitingas a separate issue, it does administer (as do some Great Lakes
             states) a complex set of fairly broad programs for environmental,protection and
             natural resource management, and these influence energy facility siting and/or
             .the coastal zone. Included in this set are programs for the siting of major
             developments (including energy facilities), long-range energy planning, oil and
             gas conservation and development control, air and water pollution control, public
             utility regulation, the protection of coastal wetlands, the alteration of rivers
             and streams, shoreland zoning with jurisdiction up to 250 feet from coastal waters,,
             ,the protection of critical areas of scenic, scientific, or historical value, and

             state land use planning and regulation in unorganized territories of the state.
             Maine is currently developing a coastal zone management plan but has not as yet
             adopted policies specific to the siting of energy facilities in the coastal zone.
                      Local autonomy in land use and deve lopment decisions is deeply ingrained,
             and coastal zone management in the State of Maine has encountered considerable
             local opposition [456].

                          (2) Long-Range Plans and Forecasts
                      Underthe Energy Resources Act the state Office of Energy Resources (OER)
             is engaged in independent, long-range energy planning. The OER provides technical
             advice on energy matters to the Board of Environmental Protection. There do not
             appear to be any action forcing provisions which relate energy facility site
             approval to long-range plans and forecasts prepared by the state. The private
             sector prepares its own plans and forecasts for future energy development, and
             these plans are more influential than state plans.

                           3) Public Participation
                      In Maine an applicant must possess all the necessary state  and local
             permits and license .s in order to apply for a permit under the Site Location of'
<pb n="111" />

                                                  95

           Development Act. Public participation in. the siting decision process begins
           with the public hearings held on these various  Ipermit and license requirements.
           In addition, the preheari ng conference and the formal decision hearing are also
           open to the public. Project-related.files of the Board of Environmental Protec-

           tion are open to public inspection.

                            Certification Procedure

                   The certification of a site for any type energy facility revolves around
           the permit sIystem established by the Maine Site Location of Development Act.
           Site approval and environmental certification of the facility are combined into
           one comprehensive application process. For petroleum refineries, port'and ter-
           minal handling facilities, and very small electric generating facilities for
           the site location permit is essentially all that is required at the state level.
           For electric generating facilities of 1,000 kW capacity or larger, the Maine
           Public Utilities Commission must also approve the proposal by granting a Certif-
           icate of Public Convenience and Necessity.
                   The process begins with the filing of an application for a site location
           permit for a power plant, refinery, or other energy facility. At this point the
           applicant must possess all the necessary local licenses and permits, as well as
           proof of ownership of the site. Although the board does require that local
           conditions be met, it retains the authority to override local approval. All
           final.approvals on the state level are handled by-the board. The information
           'requirements of thes e permits are consolidated into one application form.
                   Following notification by a developer, the state has 30 days to hold a
           public hearing on'the proposal., The board may hold a prehearing conference to
           expedite the conduct of the hearing. At the formal hearing, appropriate state
           agencies present testimony. The burden of proof is on the developer to satisfy
           the following criteria:
                   9 Financialcapacity. The developer must have the financial capacity
           and technicalability to meet air and water pollution control standards and make
           adequate provisionfor solid waste disposal, the control of offensive odors and
           the securing and maintenance of sufficient and healthful water supplies.
                      Traffic movement. The developer must make adequate provision for
           traffic movement'of all types out of or into the development area.
                   0 No adverse effect on the natural environment. The developer must
           make adequate provision for fitting the development harmoniously into the existing
<pb n="112" />

                                                       96

              natural environment and ascertaining that the development will not adversely
              affect existing uses, scenic character, or natural resources in the municipality
                    neighboring municipalities.
                          Soil types. The proposed developmentImust be built on soil types
              suitable to the nature of the undertaking [508].

                           (5) Site Acquisition
                      Site acquisition is the responsibility of the energy corporations. With
              regard to electric generating facilities, the utilities may exercise the power of
              eminent domain, subject to approval by the PUC. The'applicant for a       site location
              permit must demonstrate that the proposed site has been,acquired, before the

              permit can be issued.

                           (6) Financing
                      Maine's site location permit program is financed      through.the'normal
              state budgetaryprocess and    does not entail application   fees or production   sur-

              charges.

                      c. Maryland

                           (1) General Policy Approach
                      The State of Maryland has developed    a centralized. program to regulate   the
              siting of all electric generating   facilities.   Some elements of   this program are
              considerably different from those   adopted by other states,,while other'elements
              are fairly commonly applied. The    scope of this program is limited to electric
              generating facilities. The siting of other types of energy,facilities is handled
              under separate regulatory mechanisms with a lower degree of state involvement.
                      The Maryland program has pioneered what is generally referred to as the
              one-stop decision process. In this particular approach, input by the state
              agencies responsible for economic, health, environmental, and planning consider-
              ations is incorporated into a single, final decision by the Maryland Public
              Service Commission. The overall program is basically composed of four sub-
              programs dealing with site evaluation, site acquisition, monitoring, and research.
              The basic thrust of the program is to predict the impact of proposed generating
              facilities, to assess the impacts of existing facilit    ies, and to acquire alter-
              native sites for utilities unable to find suitable sites on their own.
<pb n="113" />

                                                 97

                   The Maryland Department of Natural Resources also plays a major role in
           the power plant siting program by conducting environmental impact as sessments
           and suitability analyses of alternative site proposals. Other major elements of
           the Maryland program include preemption of local authority in siting matters,
           requirements for long-range plans and forecasts, and a comprehensive application
           procedure for site approval.

                       (2) Long-Range Plans and Forecasts
                   Like other states having established active state-level roles in the
           regulation of electric generating facilities, Maryland requires all electric
           utilities to prepare, on an annual basis, ten-year plans specifying future
           resource requirements and proposed, potential sites for new facilities. The
           Public Service Commission compiles and evaluates the various ten-year plans and
           identifies proposed future site locations. Following the filing of the plan with

           the PUC, the DNR is notified of the proposed sites outlined in the ten-year plan.

           The DNR then conducts a detailed environmental assessment of.the sites. The

           general assessment criteria applied to the sites are essentially the same as
           those outlined in the National Environmental Policy Act of 1969. If the DNR
           determines that a proposed site is unsuitable, the Public Service Commission
           must,delete this site from the ten-year plan. If it is found that a site is
           likely to result in a violation of applicable federal or state environmental
           standards, the site must be declared unsuitable. This implies that prospective
           sites are evaluated with sufficient detail to determine compliance with air and

           water pollution standards.

                       (3) Public Participation
                   Maryland requires public disclosure of the annually updated long-range
           plans and forecasts prepared by the electric utilities. Public hearings are
           held on all Certifications of Public Convenience and Necessity and all associated
           materials are available for public inspection. Although public hearings are not
           required at other points in the process, they may be held at the discretion of

           state officials.

                       (4) Site Certification
                   Following the preliminary screening of sites outlined in a particular
           ten-year plan, the DNR conducts detailed assessments of sites deemed suitable.
<pb n="114" />

                                                    98

             This. amounts to the preparation of a formal environmental impact statement on the
             site. The final EIS on the site.must be published at least two years prior to
             the proposed date of construction as outlined in the ten-year plan. At this
             point, the formal application procedure for approval of a specific site begins.
                      The principal means of formal site approval is the Certificate of Public
             Convenience and Necessity. The certification process is handled by the Public.
             Service Commission with the technical advice and recommendations of the Depart-
             ment of Natural Resources. Within 60 days after an application has been filed
             with the commission, the DNR is notified of the application and is directed to
             complete any additional study and investigation necessary, including, but not
             limited to, the necessity for dredging and filling at the plant site and the
             water requirements of the facility. At some point following the filing of the
             application, the PSC establishes a date for the formal administrative hearing.
             Following the testimony presented at the hearing, all interested parties are
             given 15 days within which to modify, affirm, or amend their initial recommenda-
             tions. The.,final decision on the application must be mad,e by the PSC within 90
             days after the hearing. Due to the extensive preliminary evaluations of alter-
             native sites, the amount of information required in the certificate application

             is somewhat reduced.

                      The monitoring program is designed to provide feedback to the overall
             energy facility siting program. As part of this program,. the DNR issues, on a
             biennial basis-, a cumulative environmental impact statement of all power plants
             currently operating in the state.

                          (5) Site Acquisition
                      This phas e of the power plant siting process is one of the more inter-
             es,ting elements of the Maryland program. The state is actively engaged in the
             acquisition of sites determined suitable. Within two years of the date on which the
             prospective site is identified by the state, a detailed environmental assessment
             is prepared and the site is either accepted or rejected. If accepted, the site
             is acquired by the state through voluntary agreement or by condemnation.

                      The electric utilities may also acquire prospective power plant sites
             although such sites must undergo the same environmental assessment as those
             owned by the state. The inventory of suitable state-owned sites serves as a
             source of alternatives from which the utilities may lease or purchase sites in
             the even't that their own sites are unsuitable.
<pb n="115" />

                                                    99

                        (6)  Financing
                   In order to administer the*program, Maryland established the Environmental
           Trust Fund. The fund, administered by the Secretary of Natural Resources, is
           derived from a one- to three-tiehths mi.11 per kWh surcharge on electricity gen--
           erated within the state. The electric utilities are specifically authorized to
           .add.thefull surcharge to customers' bills. The fund is used to administer the
           program and  to acquire prospective sites.

                   d. 'Massachusetts

                             General Policy Approach
                   Massachusetts has   adopted one of  the most comprehensive   energy facility
           siting regulatory pr6grams'in the nation. The     program includes   electric gen-
           erating facilitie's of 100  MW or more capacity,  facilities for manufacturing or
           storing gas, and facilities for refining or storing,petroleum.       The organization
           responsible for implementing energy   siting policies is the Energy Facility Siting
           Cou.ncil. The'council is composed of    the secretaries of the Departments of
           Environmental Affairs, Consumers Affairs, Manpower Affairs, and Administration
           and Finance, and five governor appointees: one representing conservation and
           protection'., bf the'environmen@t, one professional engineer, and one each*knowl@
           edgeable' of electricity, gas,  and oil industries, respectively.
                   The siting regulatory   process is fairly centralized and    can best be
           Aescribed as a one-stop process.    The council has Authority to preempt other state
           and local requirements.

                        (2) Long@-Range Plans and Forecasts.
                   All  electric utilities are required   every five years to submit a    long-
           range electric power forecast covering the    subsequent ten-year period. In
           addition,.updates and  revisions  must be filed every   year. In preparing   the ten-
           year forecasts the utility must   provide the following information:
                   e A description of    all existing agreements   with other electric  companies
           for joint planning or  joint  fore casting of electric  power needs and the  purchase
           or sale of electric- power or  reserve capacity.
                   0  A forecast of the   electric power needs for its market    area, taking
           into account wholesale bulk power   sales or purchases   or other co-operative ar-
           rangements with other utilities and electric energy     policies as adopted by the-
<pb n="116" />

                                                      100

              commonwealth.

                       e A description of actions planned    to be taken by the company which
             .will affect  its capacity to meet such needs,   including:
                           -  expansion, reduction, or removal of existing facilities
                           -  construction or acquisition of   additional facilities
                           -  description of alternatives to   planned action such as:
                                  other methods of generating

                                  other site locations

                                  other sources of electrical power

                                  no additional electric power.
                              a description of environmental impact of each proposed facility.
              In this regard, the council shall, after public notice and a period for comment,
              be empowered.to issue dnd  revise its own list of guidelines providing a minimum
              of data  for initial review of impacts on land use, water resources, air quality,
              solid waste, radiation,.and noise.
                       Within six months of submittal of the   plan, a Dublic hearing is held, and
              the council accepts or rejects the plan in whole or in part within one year of
              filing. In making this decision the council insures that the following conditions

              are fulfilled:

                       9 All information relating to current activities, agreements and policies

              as adopted by the.commonwealth is substantially accurate and complete.
                       e Projections of demand for electric power and of the capacities for
              existi  ng and proposed facilities are based on substantially accurate historical
              information and reasonable statistical projection methods.
                       e Projections relating to service area, facility use and pooling ar-
              rangements are consistent with such forecasts of other companies subject to this
              chapter as may,have already been approved, and reasonable projections.of activ-
              ities of other companies in the New England area.
                         Plans for expansion and construction of the applicant's new facilities
              are consistent with current health, environmental protection, and resource use and
              development policies as adopted by the commonwealth.

                           (3)  Public Participation
                       Public hearings are held on all long-range forecasts and in localities
              where prospective electric generating sites are identified in the plans. Public
              disclosure of this@information is required. In addition, at least two hearings
<pb n="117" />

                                                 101

           are held on each notice of intention to construct and operate an energy facility.
           Hearings may also be held on applications for Certificates of Environmental
           Impact and Public Need.

                       (4) Certification Procedure

                   The'principal mechanism for siting certification in Massachusetts is the
           notice of intention. This process applies.to all types of energy facilities
           covered by the program. At least two  Iyears prior to the expected commencement
           date of construction the applicant must file a notice.of intention with the
           council. Separate and distinct from   the notice of intention is the processfor
           the Certificate of Environmental Impact and Public Need., Any energy company may
           petition the council for a certificate if one of  the following conditions exist:
                   The applicant is prevented from building  a facility because
                   it cannot meet standards imposed by a state or local agency
                   with commercially available equipment.
                   There has been an undue delay imposed on the applicant by
                   state or local agencies.
                   There are inconsistencies among resource-use permits issued
                   by state or local agencies.
                   There are nonregulatory issues or conditions imposed by
                   state or local agencies such as aesthetics, recreation,  etc.
                   There are disapprovals, conditions, or denials by local
                   governments [5081.
           Information required in the application includes:
                   * A description of the location of the   facility to be constructed or,

           operated thereon.
                   * A summary of the studies which the applicant has made of the    environ-
           mental impact of the facility, and a statement of the reasons for the  choice of

           the location.

                   o A copy of the long-range plan approved by the council in proof of the
           need for the facility to meet the energy requirements of the applicant'.s market
           area, taking into account wholesale bulk power sales or purchase or other co-
           operative arrangements with other utilities and electric energy policies as
           adopted by the commonwealth.
                   0  A statement setting forth the need  of:the applicant for the certifi-
           cate, including:
                         all licenses, permits and other regulatory approvals required by
           law for the construction or operation of the facility which have been granted.
<pb n="118" />

                                                     102

                             indication of the good faith effort made by the applicant,to
             obtain from state agencies and local governments the licenses,   . permits and other
             regulatory approvals required by law for construction or operation of the facility.
                             indication as to the inability, if any, of the applicant to com-
             ply with any law, ordinance, by-law, rule and-regulation affecting the construc-
             tion or operation of the facility.
                             indication As to the applicant's inability to proceed with the
             construction or operation of the facility by reason of the denial, delay, oi,
             imposition of a burdensome'condition-in issuing specified,licenses.- permits or

             approvals.
                      Only those council members with interest or expertise in a particular
             type of facility may participate in decisions affecting that particular type of
             energy facility. For instance, the oil and gas industry representatives may not
             vote on decisions concerning electric generating facilities.

                          (5) Site Acquisition
                      Electric and gas utilities can employ the power of eminent    domain, subject
             .to approval by the Department of Public Utilities, to acquire land    for sites,
             but, in general, site acquisition is achieved through voluntary purchase agree-

             ments.

                          (6) Financing
                      Massachusetts employs an application fee of $25,000 maximum for each'
             certificate application. For each forecast or supplement thereto the electric
           ..utility industry is also assessed a total of $400,000 which is broken down ac-
             cording to the proportion of electric energy generated by    each utility    A
             similar proportional assessment is levied on gas companies based on a total
             industry assessment of $125,000 annually. Finally, each notice of intention to
             construct an oil facility must be accompanied by a filing fee graduated'in ac-
             cordance,with the expected capital investment in the facility to a maximum of
             $400,000. Revenues are employed for program administration.

                      e. Oregon

                          (1) General Approach

                      On June 30, 1975, the Energy Facility Siting Council replaced the Nuclear
<pb n="119" />

                                                  103

           and Thermal Energy Council, which had been in operation four years. The Energy
           Facility Siting Council consists,of seven public members appointed by the
           governor subject to senate confirmation. The powers.and duties of the council
           include:
                   9 preparation and execution of studies,    investigations, research and
           .programs relating to all aspects of site selection
                   '6 designation of areas within the.state suitable or unsuitable for
           various types of energy facilities
                   0 establishment of standards and promulgation of rules that applicants

           for site certificates must meet.

           The council is responsible for siting power plants, transmission lines, solar
           collectors and pipelines above specified minimum sizes.
                   Oregon also has a Department of Energy whose duties include:
                      collection and dissemination of information and data on energy@
           resource:, including an annual forecast
                   0  education of the.public regarding energy problems and means of con-

           servation

                   0  coordination of energy research.
                   in addition to these agencies, there is an Energy Policy Review Commit    tee
           consisting of nine members appointed by the governor@ the president of*the senate
           and the speaker of the house. The Committee's functions are primarily to review
           programs, rules and reports and to make recommendations on all aspects of energy
           policy.

                        (2) Long-Range Plans and Forecasts
                   The Department of Energy issues an annual forecast of the energy situ-.
           ation as it affects Oregon. The forecast is to include estimates of energy
           demand, resource availability and the impacts of conservation, new technology
           and future construction. The forecast covers the five years as well as the.tenth
           and twentieth years following issuance   of the forecast.
                   Information and data for the,.forecasts are to be supplied by all producers,
           suppliers and major consumers of energy resources and by political subdivisions
           of the state. Subpoena power may be employed to obtain information, but data
           must be kept confidential and presented in such a way as to conceal the source
           if so requested.
<pb n="120" />

                                                    104

                      A preliminary forecast is required of the department by July 1. Public
             hearings must be scheduled withi@ 45 days and the final forecast must be issued
             by January 1.
                      The site certification process includes a provision for a notice of
             intent to file an application for a site certificate. This noticeof intent to
             file must be filed at least twelve months prior to the filing of the application
             for a site certificate and must identify the proposed site.

                          (3) Public Participation
                      The Department of Energy holds public hearings on the annual long-range
             forecast as described in Section (2) above. Preliminary forecasts are made avail-
             able to anyone who requests one at a fee not to exceed the cost. The final fore-
             cast is  included in the annual report of the Energy Council to the governor and
             the legislative assembly.
                      Upon receipt of a site application, the Siting Council holds public
             hearings in the affected area and elsewhere as it deems necessary. Any person may
             appear and present testimony at the hearings. The recommendation of the council
             is subject to judicial appeal. Public hearings are also held prior to deter-

             mining whether areas are suitable or unsuitable for energy,facilities.
                      The.Energy Facility Siting Council is comprised of general public members.
             Appointment to the council is denied to anyone with pecuniary interest in energy
             facilities, and employment by an owner or operator of an energy facility is pro-
             hibited for two years subsequent to councilmembership.
                      The council must designate the local governing body (of the city or county
             host to a proposed site) as a special advisory group and may appoint additional
             advisory groups as it deems necessary.

                          (4) Certification Procedure

                      The Energy Facility Siting Council is charged with advance,designation of
             sites as suitable or unsuitable for thermal power plants (nuclear and fossil)
             larger than 200 MW, geothermal power plants, and any additional energy facility
             type for which the council determines such designations necessary.
                      The first step in site certification is the notice of intent to file an
             application for a site certificate, which must precede the application itself by
             at least twelve months and include identification of the site. The Energy
             Facility Siting Council gives public notice that the intent has been filed.
<pb n="121" />

                                                 105

                   Copies of both the notice of intent and the application for site certif-
           icate are sentfor comment and.recommendation to twelve state agencies and to any
           affected city or count y. A time limit for response is s et by the council., The
           council may commission an independent study of any aspect of the proposed facil-
           ity to be funded from the application fee.
                   Public hearings are held in the affected area and elsewhere as necessary.
           Following the hearings and the receipt of any au. thorized studies, the council
           may reject, recommend, or recommend withconditions the application for a site
           certificate. Time limits from the filing of an application to final council
           action are specified as follows: 24 months for a thermal power plant, except
           combustion turbine types for which the limit is 9 months; 6 months for most
           expansions of energy facilities; and 12 months for other energy facility con-
           struction.. The governor has thirty days in which to execute the certificate.
                   The site certificate is executed by the governor.arrd the applicant and
           includeslauthorization both to construct and operate the proposed facility,
        -subject to any conditions which may,be specified in the certificate. Local'
           regulation is preempted by the state.., State agencies are to issue the appropriate
           permits, licenses and certificates subject only to conditions of the site certif-
           icate, though the individual agencies continue to exercise enforcement authority.

                       (5) Site Acquisition
                   The siting legislation does not provide,any special means of site
           acquisition. The Siting Council is charged with designating areas of the state
           as suitable or unsuitable for use as sites for various types of energy facilities.
           Applications are not accepted for sites in unsuitable areas. Public utilities
           have the power of eminent doMa4n for the purchase of sites.

                       (6) Financing
                   A $5,000 fee is required with each notice of an intent to file for a
           site certificate.' This wilibe credited against any subsequent fees. Site
           certificate applications requir'e,*fees.of 5(@ per kW of planned maximum net elec-
           tric capacity or $1,000 for each $1 million of estimated capital investment in
           any.other proposed facility or addition. In addition, thermal power plants must
           pay an annual fee of 2.5 0, per W of maximum net capacity authorized by the site
           certificate. Other energy facilities are assessed $300 for each $1 million of
           estimated capital investment. Furthermore, the statets gas and electric utilities
<pb n="122" />

                                                    106

              are assessed a total of $300,000 annually on a proportion.al basis.
                    .Funds from application fees are used solely for conducting studies with
              respect to the proposed site. Unused funds must be-returned to the applicant.
              The annual assessments are used for the operations of the Department of Energy
              and the Siting Council.

                      f. Washington

                          (1) General Approach
                      The energy facility siting program in Washington is among the most com-
              prehensive in that it provides for the siting of pip@!Iines, refineries, oil ports,
              .and transmission corridors, in addition to power plants. Responsibility for this
              program lies with the Energy Facility Site Evaluation Council which is composed
              of the administrators, or their designees, of fourteen state agencies  and an ad
              hoc member appointed by the county legislative body with jurisdiction  over the
              proposed site. The director of the state Energy Office serves as non-voting

              chairman of the council. The decisions of the council serve as recommendations

              to the governor, who has final authority to approve or reject site applications.
                      The state Energy Office is responsible for energy resource data collec-
              tion, analysis and dissemination; the coordination of research and other
              activities; advice to and support of state agencies on energy matters; and guide-
              lines for conservation plans. The director of the Energy Office is appointed by
              the governor with the consent of the senate.

                          (2) Long-Range Plans and Forecasts
                      The state Energy Office has responsibility for producing analyses of
              projections and/or forecasts of energy supply and demand. The legislation does
              not specify a time interval to be covered by such analyses or a frequency for
              their production, but they are to be prepared "as necessary for development of
              recommendations with respect to the timing of construction of additional facilities
              and other energy programs." There are no provisions for public disclosure of
              plans/forecasts; in fact, the law shows concern -only for protecting the confi-
              dentiality of information, if so requested.

                          (3) Public Participation
                      The Energy Facility Site Evaluation Council holds hearings on proposed

              site locations.
<pb n="123" />

                                                 107

                       (4) Certification Procedure
                   The Energy Facility Site Evaluation Council receives all applications
          for site certification. The council then commissions its own independent con-
          sultant study  to measure the consequences of the proposed facility on the
          environment.   Within 12 months of the receipt of an application, the council must.
          report its recommendation to the governor as to the approval or disapproval of
          the application. If the application is approved by the governor, the council
          has 30 days thereafter to compose and submit a certification agreement for exe-
          cution by the governor and applicant.

                       (5)  Site Acquisition
                   Utilities do not have the power of eminent domain in Washington. Sites
          or options thereon are generally purchased prior.to commencement of.the appli-

          cation process.

                       (6). Financing
                   A-fee of $25,900 must accompany each site application. This fee is 'used
          to fund the environmental impact study and any unused portion is returned to the
          applicant. Studies,whose cost exceeds the fee must be approved and paid for by

          the applicant.

              4.@ COMPARATIVE  ANALYSIS OF STATE PROGRAMS

                   This section provides-the means for comparing and evaluating the    state
          energy facility siting programs.previously   described (Sections.2 and 3).   While
          no critical evaluation of individual   programs will.be,undertaken here, such
          efforts by appropriate state personnel and interested citizens are encouraged.
          The material.in this section may provide the basis for such an evaluation.

                   a. S'elected Features bf@State Programs
                   Table 7 summarizes.the descriptions of 14 state energy facility siting
          programs. The 21 features listed.are divided into six general categories: the
          state's general approach to siting; provisions for long-   range plans and fore-
          .casts; provisions for public participation in the siti ng.process; selected fea-
          tures of the actual site certification process; the various means by which site
          ,selection is achieved; and different methods of financing the,siting program.
          The individual features under each of these categories are described below.
<pb n="124" />

                                                                             108

                        TABLE 7             FEATURES OF STATE ENERGY FACILITY SITING PROGRAMS

                                                              Gener9l                                         Plans and Forecasts
                                       Principal      Types of      Local    elation     Conserv.     Public      Time Appr         ocument.
                                                                         t jRto CZM                                            oval D
                                        Agency      Facilities Preemp                    Program      Discl.      Frame  Process of Method.

                      Illinois       Commerce                       No         ---          ---         %10
                                     Commission

                      Indiana           PUC             ---        By Em.                   ---         No
                                                                    Domain

                      Michigan       DNR/PSC                          No     Unspec.        None        No        ---

                      Minnesota      Environ-       PP (50 MW)      Yes     Regional     Energy         Yes       P-5       None   Utility
                                     mental         TL (200 kv)              Zoning      Agency               Biennial
                                     Quality                                Preempted                             F-15
                                     Council
                      New York       Board on       PP (50 MW)      Yes     lUnspec.   Utilities        Yes       P-10   Public   Assump-
                                     Electric                                            must                            Hrngs.   tions and
                                     Generation                                        describe                                     data
                                     and Siting

                      Ohio           Power          PP (50 MW)      Yes      Unspec.   Utilities        Yes       P-10 Public     Method,
                                     Siting         Gas &amp; Elec.                        must show                       Hrngs.     Assumpt.
                                     Commission       Trans.                             impact                                   and data

                      Pennsylvania   Dept. of                      Condi-                 None          No                  ---      ---
                                     Envr.                         tional
                                     Resources/
                                        PUC

                      Wisconsin      DNR/PUC        PP  (300 MW)    Yes      Unspec. Utilties           Yes   Biennial Public        NO
                                                    TL  (100 kv)                         must                 P-10     Hrngs.,
                                                                                       describe                        Agency
                                                                                                                       leview

                      California     Energy         PP (50 MW)      Yes        ---     Cons. Div.       Yes Biennial   Public       State
                                     Resource       TIL                                  within               F-5,10 Hrngs.       Specifies
                                     Conservation                                        ERCDC                    20   State
                                     &amp; Dev.,Comm.                                                                      Approval
                      Maine         @Dept. of       All EF          Yes      Unspec.       --- No                           ---      ---
                                     Envr.          over 20 ac.
                                     Protect.

                      Maryland       PSC/DNR        All PP          Yes      Unspec..                   Yes       P=.10 Eval.  of    No
                                                    TL (69  kv)                                                        Sites   in
                                                                                                                         Plan

                      Massachu-      Energy         PP (100 MW)     Yes      Unspec.       ---          Yes       P-10 Public        No
                        setts        Facilities     TL (69 kv)                                                         Hrngs.
                                     Siting         ST (500                                                            Council
                                     Council             kbbl)                                                           Votes
                                                      Others

                      Oregon         Energy         PP (25 MW)      Yes       None     Dept. of         Yes P-5,10     Public        No
                                     Facility       TL (230 kv)                          Energy                   20   Hrngs.
                                    @Siting         geotherm.                                                 F-1-5,   State
                                    lCouncil        PL, Solar                                                     10,20 Compiles

                      Washington     Energy Fac.    All EF            NO    Shoreline State             No        As   Energy        No
                                     Site Eval.                             Permits lEnerev                 lNecess.   Office
                                     Council                                Preempted Office                          1Prepar
                                                                                                                               esi

                      KEY:   PP - Power Plants                        ST =  Storage Tanks             P = Plans
                             TL = Transmission Lines                  PL =  Pipelines                 F = Forecasts
                             EF = Energy Facilities                   OR =  Oil Refineries
<pb n="125" />

                                                                               109

                    TABLE 7 (Continued)

                    Public Participation                          Site Certification                      Site Selection              Financing
              Agency      Access      I   Public         One,       Time'        Envr.     Alternate      Site        Site       Applic.      Annual
              Members to Info             Hrngs.        Sto       Limits        Assess.      Sites        Select.    Acquis.       Fee        Fee

               ---           ---      Facility           No         ---           ---         ---      Private      Cond. Em.
                                      Certific.                                                        Sector        Domain

                             ---          No             No         ---           ---                  Private        Em.
                                                                                                       Sector        Domain

               ---      Notice, of    Air                No         ---         By Exec.      ---      Private        Em.          ---          ---
                        Envr.         water                                      Order                 Sector        Domain
                        Permit        Permits
                        Applic.       Etc.
               7S         Yes         Criteria,         Yes       PP (I yr)       EQC         One         State       Em.        $500/      Based on
               ic                     Inventory,                  TL (180)       Staff       Alt.         Site       Domain      million kwh + $
               4FM                    Site                                                             Inventory                 ($5000        sales
                                      Certific.                                                                                   min.

               4S       P lans,       LR Plan           Yes       Hrng. 6-7 DER as            One      Site Suit- Private        $25,000        ---
               IA       Applic.       Pre-applic.                 mos after part of          Alt.      ability        Sector
                        for Cert.     Application                 applic.       applic.                Criteria

               4S       Plans,        LR Plan           Yes       2-5 yrs.       PSC/1       Four      Site Suit-    Private Formula            ---
               1G       Applic.,,     Pre-applic.                                DNR/        Total     ability        Sector for PP
                        for Cert.     Application                                 EPA                  Criteria

                        Notice of     Hrngs. on          No           ---       No            ---         Private   ',ondi-
                        Envr. Pre Envr.                                         Formal                    Sector    tional
                        Applic.       Permits                                   Require-                             Em.
                                                                                 Ment                               Domain

                        LR Plan       Plan,            2-Stop     SM. PP +        DNR         No          Private   Condi@         ---
                                      Site           IDNR/PUC     TL (150)                                Sector    tional
                                      Cert:rf.                    1g. PP,                                            Em.
                                                                    (480)                                           Domain

               5PM      Office of     Plans             Yes         18 mo.      Siting       Three        Private    Em.         0 mills/ .1 mill/

                        Public        Forecasts,     Except CZ                  Agency       Total,       Sector    Domain         capac.       kwh
                        Advisor       Site                                      (ERCDC)      '0.ne                               ($1000 to
                                      Certific,                                             Inland                               $25,000)

              lopm      Notice of     Pre-applic.       Yes       Hrng. 30      Part of       No          Private     Em.          ---
               is       Permit        hr-ng, siting               da. after     Permit                    Sector     Domain
                        Applic.       hrng.                       ap lic.       Applic.
               PSC      LR Plans      Applic.           Yes        2 yrs.         DNR        Yes       Site In-     By State       ---      .1 - .3
              Members   EIS Sites     Conference                  minimum                              ventory &amp; and                        mills/
                        Applic.                                                                        Utility      Utility                  kwh

               4S       LR Plan       LR Plan           Yes       PP(6 mo.)     Dept. of      No       Site           Em.        ?25,000    Complex
               2PM      Notice of     Notice of                   OR(1-2 yr)    Envir.                 Suitabil-     Domain      :or PP,    Fee on
               3G       Intent        Intent                                    Affairs                   ity                    omplex     Plans &amp;
                        Applic.       Applic.                                                          Criteria                  -or EF     Forecasts

               7PM      LR Plans      P+F            Yes w/       PP(24 mo)     Indep.        No       State        Condit.      50 mills/  25 mills/
                                      Suitable       Governor     Other EF      Study                  Desig.         Em.        kw           kw
                                      Areas,                      (6-12 mo.)    Possible               Suitable     Domain       1% of      $3001$
                                      Site Cert.                                                       Regions                   invest.    million

                        Not           Site              No        12 Mo. +      Indep.        No       Private      No Em.       $10,000
                        Specif.       Cert.           ocal &amp;      60 da. +      Private                Sector       Domain
                                                      overnor     30 da.        Consult.

                 S      State Agency Heads                             G  = Other Governor Appointee
               PM'=     Public Membir                                  A  - Ad Hoc Member
                        (Appointed by Governor)

                1 Days, unless indicated otherwise.
<pb n="126" />

                                                       110

                            (1) General
                        These features describe the methods which each state employs to accomplish
               energy  facility siting.@

                                 .(a) Principal agency
                        This column lists the one or two agencies with primary responsibility
               for energy facility siting'. Common-abbreviations are used.

                                 (b)  Types of facilities
                        This column indicates the types of facilities   regulated by the state
               siting agency. A blank indicates that any regulation     of siting is simply a part
               pf the utility regulation process and not addressed specifically by the state.
               Minimum sizes are indicated for power plants (PP), transmission lines (TL), and.
               petroleum storage tanks (ST) where appropriate. Oregon includes pipelines (PL),
               geothermal facilities and solar collectors among its regulated facilities.

                                 (c) Local preemption
                        This column indicates whether or not local zoning laws are preempted by
               the state in energy facility siting. In Indiana, the utilities' power of eminent
               domain supersedes local zoning,and utilities are-generally unrestricted in their
               site selection. In Pennsylvania, the commonwealth may grant     eminent domain
               powers -that override local zoning restrictions.

                                 (d) Relation to CZM

                        This column specifies what, if any, relationship exists between the
               regulation of energy facility siting and the management of the coastal zone.
               At present, only California provides for coordination between the agencies re-
               sponsible.for coastal zone management and energy facility siting. This is
               expected to change as other coastal states develop,their coastal zone management

               programs.

                                 (e) Conservation program
                        One approach to the regulation of siting involves.efforts by the state
               to reduce the demand for sites by reducing the demand for energy. The state
               itself may assume an active role in conservation or it may require that indus-
               try implement conservation programs.
<pb n="127" />

                      (2) Long-Range Plans and Forecasts
                  The construction plans and demand forecasts of-the energy industry are
          important to the siting process. The states have various ways.of handling
          plans and forecasts.

                         ..(a) Public disclosure
                  This column indicates whether or not industry plans and forecasts are
          made public. Such plans and forecasts are generally required of those industries
          whose siting is regulated by the state. The law in Washington allows the state
          siting council to obtain information from the industries but does not provide
          for public disclosure of that information.

                           (b) Time frame
                  The period to be covered by the required plans (P) and forecasts (F) is
          indicated, Forecasts are often included as part of a plan where only the latter
          is indicated. Plans/forecasts are to be submitted annually unless otherwise

          indicated.

                           (c) Approval process
                  The means for approving plans/forecasts is indicated in this column.
          Approval implies that the plan will assume a formal role in the regulation of
          siting, such as a requirement for subsequent siting proposals to conform with
          the plan.

                           (d) Documentation of methodology
                  This column indicates.the means by which the forecast methodology is
          documented. The state either requires that the forecaster.describe his method-
          ology, including the data and assumptions employed, or the state may spe6ify
          the methodology to be emplo@ed:

                      @3) Public Participation
                  The states provide a variety of devices for involving the public in the
          siting process. The previous section (Plans and Forecasts) implies some public
          role in the states with regard to disclosure of long-range plans and the require-
          ment for public hearings on the approval of plans. Additional public  parti&amp;ipa-

          tion is indicated in this section.
<pb n="128" />

                                                     -112

                                      (a) Siting agency members
                           This column shows the composition of the state energy facility
               siting council. The council usually includes public members appointed,by the
               governor (PM) or representatives of state agencies (S). Other governor appoint-
               ees (G) represent special interests, and New York provides an ad hoc member (A)
               to represent the locality in which a site is being considered for approval.

                                      (b) Access to information
                       This column indicates the provisions for keeping the public informed on
               various aspects of the siting process.

                                      (c) Public hearings
                       This column indicates whether public hearings are held, and if so, for which
               aspects of the siting procedure they are held.

                           (4) Site Certification
                       This section is comprised of selected  features of,the actual site

               certification process.

                                      (a) One-stop siting process
                       An affirmative response here means that a single agency has responsibility
               for site certification. Facility certification may be performed separately by
               the public utilities commission, the department of natural resources,, or the
               environmental protection department.

                                      (b) Time limits
                       This column indicates the period of time alloted for the site certifica-

               tion process from the receipt of the application through final approval. Other
               time frames are specified where appropriate. This time may be different for
               power plants (PP), transmission.lines (TL), oil refineries.(OR), or other energy
               facilities (EF).

                                      (c) Environmental assessment

                       The entity responsible for the assessment of environmental impacts on
               proposed sites is listed in this column.
<pb n="129" />

                                                113

                                M Alternate sites
                  This column indicates requirements for the proposal and consideration
         of alternate sites as opposed to an application for approval of a single site.

                           (5) Site Selection
                  This category is divided into two components; site selection and site
         acquisition.

                                (a) Site selection
                  This heading re fers to the choice of a site or sites to be proposed for
         construction of an energy facility. The private sector (utility, etc.) is
         usually free to find and propose sites, but some states have chosen to enter
         the process at this early stage. The state may establish criteria for the
         selection of sites or take a more active role in the procesTs.

                                (b) Site acquisition
                  Eminent domain is generally provided to regulated utilities while other
         energy industries must purchase sites on the-open market. Eminent domain powers
         may be conditioned upon site certification.

                           (6) Financing
                  The two common methods for financing the energy facility siting program.
         are the application fee and the annual fee.

                                (a) Application fee
                  This is a fee assessed with each application  for site approval. The fee
         may be based on the proposed capacity or cost of the   facility.

                                -(b) Annual fee
                  The annual fee is used to finance general agency functions and is often
         based on annual electricity production, either.in terms of kilowatt-hours or
         dollar value or both.

                  (b) Evaluation Criteria
                  This section will suggest a set of criteria'by which siting regulation
         programs may be evaluated. These'criteria@have been drawn together from a
<pb n="130" />

                                                     114

               variety of sources.' Most of them, rather than specifically addressing energy
               facility siting, focus on some aspect of public sector decision making.

                           (1) Resolution of Conflicts of Interest
                       The program should prvide for the resolution of conflicts among all
               interests. Government should seek to identify and provide for the public inter-
               est, which in this case may be considered to consist of several special inter-
               ests, including the assurance of a reliable supply of energy and the protection
               of the environment. There are also components of the public interest concerned
               with economic matters (e.g., low utility rates, return on investment by utilities,
               etc.) and environmental sub-interests related to the coastal zone. These inter-
               ests and others must Ul be considered together and balanced against one another
               in the siting of energy facilities.
                       Conflicts.have arisen over the use of different types of fuels dueto
               the inherent interrelationships among the various forms of energy and predic-
               tions of scarcity, both real and artificial (e.g.,.an oil embargo) of certain.
               forms. The production of electricity may entail the use of fuels better used
               for other purposesi and electricity itself becomes a form of energy that is
               interchangeable to some degree with various fuels. The issue of energy use as
               opposed to conservation is also one that states may choose to address.

                                Accountability to the Public
                       Those responsible for energy facility siting regulation should be
               accountable to the public and responsive to public needs and desires. Maximum
               accountability is achieved through direct popular election, though this method
               may be unacceptable for other reasons,.- Provisions to@assure accountability of

               appointed decision-makers include the accountability of the appointer and
               restrictions on the previous or subsequent employment of decision-makers by
               those regulated. An open decision process is also essential.
                     .Open decision making also promotes responsiveness. Th&amp; process should
               afford@meaningful piablic input at public hearings and through workshops, advisory
               councils, and, perhaps, representation on the decision-making board. Responsive-
               ness is further enhanced by public access to information in a timely fashion.

                           (3) Effective Planning Mechanism
                       The process should include an effective planning mechanism. To plan
<pb n="131" />

                                                115

          effectively, decision makers require"both information and the authority to
          implement plans.* Information includes the long-range plans and forecasts of
          energy suppliers and independent (state) data collections and.analysis for
          economic and environmental impacts. Effective planning requires knowledge of
          how each energy facility will fit-into the ultimate energy scenario for the
          state at some future date. The  effect of today's decisions on limiting future

          choices must be considered.

                      (4) Coordination with Other Programs
                  The facility siting program should be coordinated with other energy   and
          land use programs. Facility siting should account for the inherent interrela-
          tionshilps and interchangeability among all forms of energy. An overall energy
          policy which addresses alternative uses of.fuels, innovative technologies, and
          conservation should be developed at the state level and coordinated with facility
          siting. Siting should also be coordinated with programs affecting land use in
          critical areas or the,.coastal.zone or general programs for the siting of large

          facilities.

                      (5) Regional Needs
                  Energy facility siting should provide  for regional needs.  The site
          certification process should preempt local zoning  and other local land use au-
          thority in order to assure a more rational program based on issues other than
          local in nature. Energy facilities require consideration of regional, state,

          interstate and national needs and-resources.

                     .(6) Environmental Protection
                  The siting process should specifically address protection of the envi-
          ronment, especially the-coastal zone. Protection of unique and fragile eco-
          systems should be a primary concern in energy facility siting. The coastal zone
          is a small portion of -total land area but is subjected to the greatest develop-
          mental pressures. The unique ecological, recreational, and aesthetic aspects
          of the coastal zone require special consideration and protection in any program
          for energy facility siting..

                      (7) Energy Supply
                  The siting process should facilitate provision of an adequate supply of
<pb n="132" />

                                                    116

              energy. The process should commence sufficiently in advance of planned construc-
              tion to preclude delAy in the availability of new sources of energy. Time limits
              should be established for the various phases of the process. "Generic" issues

              common to several facilities or sites should be resolved in advance of the

              siting process to obviate repeated consideration and arbitrary decisions.

                          (8) Funding
                      The energy facility siting program should be adequate ly funded. The
              effectiveness of the program should not be constrained by a lack of resources.
              A permanent staff should provide information on environmental, economic, and
              other issues to promote consistency and expertise in the siting process.

                  5. IMPLICATIONS FOR POLICY OPTIONS

                      The existing institutional arrangements governing energy facility siting
              in the Great Lakes Basin have several significant implications for the kinds
              and ranges of options that can realistically be implemented by the,states. At
              the federal level, the policies and performance standards of the Clear Air Act
              and the Federal Water Polluction Control Act are of fundamental-importance to
              siting. Options available to the states  with regard to federally established
              environmental protection standards are subject to a one-way flexibility; the
              states cannot institute standards less stringent than those mandated, by the U.S.
              EPA. The Coastal Zone Management Act of 1972 as amended, which is ultimately
              administered by the states, contains several provisions of primary concern to
              this study. Most of these provisions, however, have not been sufficiently
              studied to justify definitive statements as to their influence or value. Other
              federal agencies concerned with energy facility siting operate under their own
              legislative mandates and policies. However, under Section 307 of the CZM Act,

              these agencies are required to insure and demonstrate that their actions are
              "consistent" with approved Great'Lakes State CZM programs. Consideration must
              also be given to the siting of facilities that are in the national interest.
              Thus, it behooves the states to consider a broad range of alternative institu-
              tional mechanisms with wRich to implement policies for the siting of energy

              facilities in the coastal zone.

                      The preceding overview of state regulation of energy facility siting
              indicates that an extremely wide range of factors is at play in determining the
              overall regulatory climate. The policies, programs, legal authorities, and
<pb n="133" />

                                                117

           social institutions that operate within each state will ultimately determine
           those options that are easily implementable, those that will require significant
           changes in the existing institutional framework, and those options that are
           simply'not feasible. The wide variety of approaches to energy facility siting
           regulation exhibited by the Great Lakes states, coupled with the fact,that is
           unrealistic to restrict energy facility siting regulation to the coastal zone
           management program, dictate that the range of options for institutional alrange-
           ments developed later in this report should be broad in scope.
                  In view of these considerations, an attempt will be made, to the extent
           practicable, to tailor institutional options to the specific policies,programs,
           legal and organizational arrangements, discussed above. However, it is clear
           from the preceding institutional overview that the feasibility or attractiveness
           of any set of options will vary a great deal from state to state. A detailed
           analysis of the implications of each option as applied to each of the Great
           Lakes states requires an intimate familiarity with the situation current in
           these states, and is beyond the scope of ihis report. Rather, it is intended
           that the institutional options presented will provide a broad-based framework
           of cons'iderdtioh from which'skilled, informed individuals at the state level
           will select elements for indepth analysis.
                  One'very significant implication underscored by this institutional
           overview clear to all those involved in energy facility siting, is that there is
           a pressing need to design regulatory processes that are streamilined,operate
           efficiently and are capable 6f insuring decisive action on proposals within well-
           defined time periods. However, no process can be successful in the long ruo
           unless adequate measures are incorporated to insure consideration of the full
           range of public and private concerns for energy facility siting and management

           of coastal area resources.

                  One final point should be addressed in this discussion. The primary
           focus of this study is the siting of energy facilities in the coastal zone.
           Thus, policy initiatives.in this area by coastal states are of particular inter-
           est. A concerted effort was made to identify such initiatives in the states
           analyzed in this overview. In addition, several other coastal states were con-
           tacted for this purpose. The conclusion that can be drawn is that, in general,
           the adoption of policies by coastal states to guide the siting of energy facil-
           ities in the.coastal zone is at an early state of development. Several state CZM
           programs are currently engaged in this activity, but have notas yet produced
           material useful to this study.
<pb n="134" />

                                                 119

                                             Chapter IV

                                      TECHNICAL CONSIDERATIONS

          A. ENVIRONMENTAL AND ECONOMIC FACTORS AFFECTING THE SITING OF ENERGY FACILITIES,
              AND ANALYSIS OF COASTAL DEPENDENCE OF FACILITIES

              1. INTRODUCTION

                   a. Purpose
                   This section reviews the technical factors, both environmental and
          economic, which determine the eventual location of energy facilities, and sum-
          marizes the impacts associated with these facilities once they are sited. Also,
          it is the intent of this section to determine'the degree to which these facili-
          ties are dependent on coastal resources and locations, based on the technical
          factors mentioned above. These findings will then provide the basis for the
          development of technical pol icy options for the future siting of energy facili-

          ties in the coastal zone.

                   b. Scope
                   The energy facilities which have been consi dered for this report are
          those involved with electrical energy generation, fuel transshipment and   storage,
          and fuel production. Specifically, they are fossil-fuel (coal) and nuclear gen-
          erating plants, coal and oil transshipment and storage,facilities, and petroleum
          refineries. Emerging technologies which may s   ignificantly affect these fAcili-
          ties within the time frame of this report (15-20 years) have been included with
          the,facility descriptions.

                   C.  Study A@pproach
                   The coastal dependence analysis is carried out in several phases. Con--.
          siderations  associated with the site selection process for energy'facilities are
          outlined in  general. The facilities are individually described and their speci-
          fic siting requirements and considerations summarized. Next, the environmental
          and economic impacts associated with the construction, operation and main-
          tenance of each of the facilities is reviewed. A facility cost analysis follows
          which highlights the relative costs of the essential components of each facility
          and indicates how these costs may  vary with location.
<pb n="135" />

                                                      120

                       Following these three sections of background information and analysis is
               a discussion of those factors determined to be most significant with regard to
               the question of coastal dependence. In conjuction with this discussion is the
               presentation of a case study that attempti to relate the identified coastal de-
              .pendent factors to the final siting decision for a proposed (and approved)
               energy facility. Finally, the implications of this coastal dependence discus-
               sion are summarized. as they may relate to the technical policy options which
               the coastal zone management programs of the eight Great Lakes states may con-
               sider in the formulation of their individual energy facility siting policies.

                       d. Definition of Coastal Dependency
                       In determining the relative dependence of an energy facility.on a
               coastal location,. it is important to understand what is meant by the term coast-
               al dependence. To provide latitude for analysis and consideration.1 yet remain
               within the confines of the study objective, the following definition was
               adopted.
                        The determination of energy facility location with respect
                       to the lake shore as expressed through the following general
                       considerations; system requirements, safety, engineering, en-
                       vironmental, institutional, and economic.

                       This definition broadens the analysis beyond simple dependency into a
               more general facility location examination. By maintaining reference to the
               lakeshore, however, the intent of coastal zone management, and the role of the
               state coastal zone programs may be more readily addressed.

                   2. GENERAL SITING CONSIDERATTONS
                       A review of.procedures for siting energy facilities has resulted in the
               selection of six general considerations which appear to be applicable, in a
               broad sense, in the planning and location of all of the.selected energy facili-
               ties addressed in this report. The ordering of the considerations should not
               imply a priority rating, as the considerations will vary in their importance
               depending on the facility (e.g., safety will be a higher consideration for the
               siting of a nuclear p lant than for the location of a shipping'port). Neverthe-

               less, certain facets of each of the six considerations will contribute to the
               eventual selection of any energy facility site [174].
<pb n="136" />

                                                 121

                   a. System Planning
                   Included in system planni4ig are considerations given to territorial
          responsibilities of public utilities, geographical locations of projected load,
          coordination with system transmission plans, and location with respect to the
          fuel source and transportation routes. Production and/or storage capacity of
          the proposed facility is coordinated with these systems considerations in order

          to meet.demand requirements.

                   b. Safety and Reliability
                   Safety considerations include the location of.population centers and
          associated population distribution and density, seismological and geological
          restrictions on foundation locations, and potential lake or riverine flooding.
          As stated above, safety considerations are applied most heavily to siting of
          nuclear energy facilities to reduce potential radiation threats. In addition,
          safety considerations are applied to fossil-fuel plants, refineries    and gasi-
          fication and liquefaction plants, with regard to air and water emissions and
          the resultant health and safety of.the population centers. Lake and river
          flooding are important safety and reliability considerations in the siting of
          plants. Likewise, geological and seismological factors are both safety and
          reliability considerations.

                   c. Engineering
                   Engineering considerations are numerous and  extremely site- and f acility-
          specific in their application to overall siting   criteria. However, several gen-,
          pral aspects of engineering feasibility may be applied to the siting of energy
          facilities. These would include   water supply, accessibility to trans  portation
          routes, soil and/or bedrock conditions, topography, and facilities.design.
          Water supply and coal delivery are the  most important of the engineering con-
          siderations  in the siting of energy production facilities. Water supply is a
          determinant  of the.cooling method alternatives that may be considered.

                   d.  Environmental

                   Perhaps the most,recently developed and most important considerationsin
          terms of their widespread applicability are the variety of factors which fall
          into the  environmental category. Enacted primarily via the provisions of the
          Environmental Policy Act of 1969, environmental siting criteria have come to
<pb n="137" />

                                                     122

               the forefront of considerations in the overall site selection procedure for
               energy facilities. Among these considerations are the dedicated lands, en-
               vironmentally sensitive areas, surface and groundwater hydrology, meteorology,
               aesthetics, and public attitudes. Associated with these are the various air
               and water quality considerations which must be investigated regardless of the
               type of energy facility. Thus, consideration must be given to present and po-
               tential land uses and the potential land uses and the potential environmental
               impacts of a proposed facility.

                       e. Institutional/Regulatory
                       Siting considerations within this category refer to all of the regula-
               tory requirements which must be met in both the siting procedure and the final
               site selection and facility construction and operation. These include all
               local (where applicable), state, and federal regulations and requirements apply-
               ing to enviornmental standards, water resources, land use, transmission and
               transportation routes,,economic. development, and activity-specific policies.

                       f. Economics

                       There are three primary cost considerations to be weighted when looking
               at the economics of energy facilities: the cost of system planning considera-
               tions, the cost of engineering considerations,.and the cost of environmental
               and social considerations [174]. These may be very site specific. The system
               planning costs include factors such as transportation routes, access to the,
               site, and the transmission line location. Engineering costs are concerned with
               excavating, building, and operating the facility.   In this report, costs related
               to@diffetent cooling systems and transmission lines will be evaluated. Environ-
               mental costs are concerned with mitigation of air, water, and land quality prob-
               lems, while social costs and benefits are concerned with sociolocrical effects,

               land values, fiscal effects, local economic effects, and public acceptance.

                   3. FACILITY DESCRIPTIONS AND SITING REQUIREMENTS

                       a. Fossil-Fuel (Coal) Power Plants

                           (1) Description

                       The facilities considered in this section are base load electrical pow-
               er generating plants that burn fossil-fuels to generate steam. Because it is
<pb n="138" />

                                                   123

           likely that the majority of future'fossil-fuel Vower,plants in the Great Lakes
           Basin will use coal as their primary heat source'', discussion.is limited to such
           facilities. In developing the siting consideration presented below, it has been
           assumed that present technology will-be employed in the design and operation of
           new plants built in the time frame   of this study. 'A discussion of how new
           -technologies might affect these considerations is included at the end of this

           section.

                   The analysis of the fossil-fuel power plant is based on a 1,000 megawatt
           electrical output (MWe) capacity coal-fired unit with a plant life of 35 years.
           It is further assumed that this unit operates    at 318 percent efficiency with a
           capacity factor of 65 percent on an annual basis. It is recognized that the
           -present trend is toward multiple-unit complexes with total outputs in.the range
           of 1000 to 2000 MWe, with some as large as 3200 MWe (e.g.,' the Monroe facility
           operated .by Detroit Edison). While the site'requirements are developed for only
           one such unit, problems related to scaling the facility up are also addressed.
                   Figure I shows a simplified schematic diagram of a fossil-fueled gen-
           erating system [222]. In actuality, a modern steam-electric plant is much more
           complex than Figure 1 suggests, "with a number of steam cycles operating at
           different temperatures and pressures and driving several high and low pressure
           turbines mounted on the  same shaft as the generator" [451; p.54]. 'For the pur-

           poses of this study however, the information'in Figure 1 will be sufficient.

                        (2)  Site Requirements
                   In'addition to the general   site selection criteria discussed previously
           there are several spec.ific@site requirements considered in choosing a site for
           a major new coal-fired power plant. These are discussed below, with quantitative
           estimates.of resources@(land and.water primarily) required given where appro-
           priate and available.
                            (a) Land requirements
                   The amount of land required for a coal-fired power plant depends on

             MWe refers to the electrical output capacity of the facility. This is dis-
             tinguished from MWt, the thermal energy equi   .valent, which.represents the
             total energy produced by the combustion of the fuel. The 1000 Mwe figure
            .assumed for a fossil-fueled power plant would, be a very large'facility by
             today's standards (a single unit plant may be 800 MWe). The selection of
             1000 MWe should not be seen as advocating a larger unit size for coal-fired
             pl ants. It was selected for convenience and comparative purposes only.
<pb n="139" />

                                                           FIGURE 1

                                          SCHEMATIC OF A FOSSIL FUEL  (COAL) POWER PLANT

                                         High Pressure
                                          HighTemperature Steam
                                                                       Turbine
                 Heat Input                                                       Generator            El ectrica I
               To Cycle                      Boiler                                              -&gt;-,Energy
                 (Fuel)
                                                                                     Mech.anical Energy
                                     High Pressure                                   Output To Generator
                                    Nat  Ier            Condenser            Low   Pressure
                                                                             Low   Temperature
                            Pump                                             Steam
                                         Low Pressure
                                         water
                                                                Heat Rejected From Cycle

                                                                                                 [Source  @22]
<pb n="140" />

                                                125

           several factors: onsite requirements for fuel handling and storage, setting
           (urban or rural), solid waste di;posal techniques, cooling system type, possible
           multiple use of parts of the site, and ultimate plant capacity 1203, 451].
                  Land required for the actual powerhouse (boilers, turbines, generators,
           and condensers) itself is quite small, amounting'to less than 5 acres for the
           1000 MWe facility considered here. In addition parking lots, office space, and
           emission control devices require approximately 5 acres, bringing the  total to.
           about 10 acres (estimated from information in 451).
                  An important,determinant of site size is the fuel handling and storage
           system. Generally, th'ere.are two coal storage areas, one that provides the
           feed'to the combustion chamber, the.otber holding a larger reserve supply to
           allow the plant to operate through fuel supply interruptions. While reserve
           requirements vary, in the Great Lakes Region, a six-month reserve supply is
           generally maintained to allow for winter disruption of the shipping season
           [526,.539]. Facilities not dependent on lake-borne coal deliveries also main-
           tain reserve supplies  but may be enough for only 90 days of operation [203,
           4511. Six-month and 90-day reserves for a 100OMWe facility would require about

           50 acres and 25 acres respectiv ely. The size of this coal storage area will
           vary with plant size, so that a multiple unit facility would require propor-
           tionately more land for storage. A linear relationship between plant size and
           storage area can be assumed if pile heights-remain constant (e.g., a 2000 MWe
           plant would require twice the storage area of a 1000 MWe plant).
                  Ash disposal is another major factor in determining the site size re-
           quired for a-coal-fired plant. Coal burned in large plants in the Great Lakes
           Region had an average ash content of 11 percent iii 1973 [192]. Estimates based
           on a 3000 MWe facility indicate that 300-400 acres would be required for ash
           disposal, assuming a 35-year plant life and an average pile depth of 25 feet
           [first cited in 4421. This  gives an incremental requirement of 0.0033 acres/,
           year/MWe for ash disposal.  For the 1000 MWe facility considered in this study,
           a total of 100 acres to 130 acres would be needed over the life of the plant.
                  The above discussion does not take into account the potential for fly-
           ash recovery and reuse. A study [cited in 451] by the Edison Electric Insti-
           tute indicated that 17.4 perce-at of the fly ash generated nationally was reused.
           Possible uses include backfilling,mines, neutralization of acid.mine water, use

           in automobile tires and cement, and construction fill [4511.

                 ..Another solid waste disposal requirement is additional land for sulfur dioxide
<pb n="141" />

                                                      126

             .control wastes. @If a throwaway system (a system in which the adsorptive mate-
              rial is used only once, such as limestone scrubbing) were      used,.the land re-
              quired forwaste disposal would be, increased by 100 to 200 percent [442]. Also,
              additional land for limestone receiving,and storage would be needed.
                       The final important consideration in determining the land required for
              a coal-fired power plant is the cooling system used.; A 1000 MWe plant of the
              type considered here would reject 3.62 x 10   9 Btu/hr of waste heat on an annual
              basis. Of this, 90 percent (3.26 x 10    9 Btu/hr) is dissipated to the cooling
              water through the condenser, with the remaining 10 percent lost up the stack.
              The acreage required for each of the cooling system alternatives considered here
              for a 100.0 MWe plant are [from 203]:

                                   Once-through                            1 acre

                                   Natural Draft Tower                    10 acres

                                   Mechanical Draft Tower                 45 acres

                                   Spray Canal                           100 acres
                                   Pond                                2,000 'acres

                       Transmission lines (on-site) and switchyards will add about     10 acres
              more to  the total land required.
                       Based on the information presented above, a 1000 MWe-coal-fired power
              plant will occupy from 145 to almost 2,500 acres depending on the cooling'sys-@
              tem used, SO x waste disposal, and coal reserve size. "Typical" configurations
              and their-site sizes are given below:
                          Once-through cooling, 6-month coal

              supply (50 acres) onsite ash (120 acres) and
              SOx waste (200 acres) disposal   . . . . ... . . . . .   395 acres

                       e Natural draft cooling towers,
              6-month coal supply, onsite ash and SO   x
              disposal . . . . . . . . . . . . . . . . . . . . . .     405 acres

                       o Mechanical draft towers, 90-day
              coal supply, 20% ash utilization (removed
              from site), no SO waste disposal    .. . . . . . . . .   190-acres
                                x

                          Spray canal cooling, 6-month coal
              supply, onsite ash and SO waste disposal                 495 acres
                                         x
<pb n="142" />

                                                  127

                    These figures do not take into  account multiple use areas, buffer zones
           to shiel'd the plant from general view,  transmission line rights-of-way, or any-
           thing else beyond the  factors discussed  above. However, they do compare well
           with figures prepared  for a conventional plant both with and without SO scrub-
                                                                                     x
           bing systems--640 and  435 acres, respectively [222].

                            (b)  Location with respect to population
                    Unlike the' case for @nuclear facilities, there is no explicit exclusion
           or isolation requirement for coal-fired power plants. They can, therefore, be

           located near to population concentrations and, in fact, have been so in most
           cases in the past to meet system requirements and to take advantage of-reduced
           @transmission costs. However, while there may not be specific regulations re-
           garding isolation,'it should be apparent from the above discussion regarding
           land requirements that in many cases such isolation is necessary; the expense.
           of procuring storage land in urban areas might offset the savings of reduced
           transmission distances. In addition, public health problems related to air
           quality may force plants to locate away from metropolitan,areas (see Section
           IV.A.4.C.1). Finally, aesthetic considerations and other factors that influ-
           ence public acceptance may necessitate isolating new facilities from large

           population centers.

                                 Water  requirements

                    As mentioned above, a 1000 MWe coal-fired power plant with the operating
           charactetistics assumed here (65% plant capacity, 38% efficiency) would reject
           3.62 x 10 9 Btu/hr. annually. The purpose of the cooling system is to absorb a
           large part of this excess heat.and dissipate it to a large receiving body (the
           atmosphere, a river, lake, or ocean). There are three basic elements common
           to all systems [441]:
                       An intake for supplying cooling water to the power plant
                    9 kcondenser where turbine exhaust steam is condensed at low tempera-
           ture and low pressure while transferring waste heat to the cooling water
                    a A device for transferring this waste heat to the atmosphere (and
           finally  to the ultimate sink--outer space).

                    The amount of water that mustflow through the condenser is determined
           by the amount of heat rejected by the plant and by the temperature rise desired
           in the cooling water. Figure 1 [from 4411 shows the relationsfiip between these
<pb n="143" />

                                                     128

              factors. Based on the fossil fuel plant characteristics shown in Figure 2,
              a 1000-MWe plant would require the following cooling water flow rates for

              the accompanying temperature rise:
                                lemperature Rise (At)               Flow (cfs)
                                       30OF                            600
                                       200                             900
                                       100                           1,800

              As these figures  show, the  flow across the condenser rises in direct proportion

              to the decrease in At.

                      As discussed in the section on Land Requirements, five alternative

              cooling methods are considered for this report: once-through or open-cycle;
              natural draft: wet cooling towers; mechanical,draft wet towers; spray canals;
              and cooling ponds. The last four systems are termed closed-cycle because most
              of the cooling water is recycled through the system in a loop configuration.
              Not considered explicitly in this study were the combination systems, which
              utilize an off-stream device, such as a cooling tower, to cool the water prior

              to returning it to the source waterbody. These three cooling configurations
              are shown in Figure 3. In addition, Figure 4 shows simplified cross-sectional
              views of three of the closed-cycle devices: natural draft towers, mechanical
              draft towers, and spray canals.
                      Two water use requirements are important for the plant cooling system:
              total withdrawal and amount consumed. In a once-through system, consumption is
              quite small, but withdrawals must equal the   flow across the-condenser, generally
              1000 cfs (450,000 gpm) or more. In closed-cycle systems, the consumption is
              more significant, although withdrawals are limited. The figures in Table 8
              show representative values for evaporative losses for    a 10007-MWe fossil-fuel
              plant.
                       Makeup water for evaporative losses is only a porti   on of the water
              requirement for,a closed-cycle system. Another important consideration is
              blowdown water replacement. Blowdown is that portion of the cooling water
              removed to prevent an undesirable buildup of dissolved and suspended solids.
                      The blowdown (B) is a function of the available makeup
                      (B+D+Ev) water quality and is related to evaporation (Ev)
                      and drift [water lost in droplet form] (D) in the fol-
                      lowing manner:
                                            C = (B+E-%,+D) / (B+D)
                      In this equation, C = cycles of concentration: the number of
                      times the concentration of any constituent is multiplied from
                      its original value in the makeup of water [441; pp. 24-251.
<pb n="144" />

                              129

                            FIGURE 2

                       COOLING WATER REQUIREMENTS
                    FOR FOSSIL AND NUCLEAR POWER PLANTS

               COOLING WATER ME'QUIREMENTS FOR
                  FOSSIL AND NUCLEAR POMIER PLANTS
                   NUCLEAR,             FOSSILIW
                      33 %7              71 t = 40%
                   IN-PLANT LOSSES      IN-PLANT AND
                     5 */6               STACKLOSSES'
                                         =15 %

            2500

                                           .0e
            2000             At
                        J**           eLp
         CL
            1500      v
         Ld

             1000

             500           .01

              .0
               0        1000    2000      3000
                    COOLING VJ A T ER FLOW 'to), Cis

                 AT = CONDENSER TE"tAP. RISE.
                    = PLA71T THEMMAL EFFICIENCY

                                         [Source 4411
<pb n="145" />

                                                                                      130

                                                                                  FIGURE 3

                                                     ALTERNATIVE COOLING SYSTEM CONFIGURATIONS

                                                              STEAM FROM TURBINE                       WATER TO BOILER
                                                                                                   ONDENSER

                                                                                                      OPEN CYCLE

                                                                 COOLING
                                                                 TOWERS
                                                            (not used In this 'Ode)
                                                                                                 t -

                                                                                                   ONDENSER

                                                                                                      HYBRID CYCLE

                                                                COOLING
                                                                TOWERS

                                                                                         RIVER

                                                                                                   CONDENSER

                                                                                                      CLOSED CYCLE

                                                                COOLING
                                                                TOWERS
                                                                             SLOWDOWN!             MAKE-UP WATER
                                                                                         RIVER
                                                                HD&lt;

                                                                Ha@

                                                                                                                      [Source         451]
<pb n="146" />

                                                                   131

                                                               FIGURE 4

                                                   CROSS-SECTIONAL VIEWS          OF

                                                      THREE COOLING DEVICES

                                                     AIR OUT
                                                                                            AIR OUT

                                                                            WATER
                                                                             IN
                                                                         (From wdemed

                                                                               AIR IN                     AIR IN

                                                                7%
                                                                                                          WATER
                                     AIR IN                            AIR IN                              OUT

                                                                                       MECHANICAL DRAFT
                                                                        WATER OUT
                                        FILL MATERIAL WATER IN                           COOLING TOWER
                                                    (From condonser)                      (WET-TYPE)

                                            NATURAL DRAFT COOLING TOWER
                                                    (WET-TYPE)

                                                                     DIFF USERS

                                                                            WATER OUT
                                        WATER IN  @,3
                                      (From coridanser)

                                                      SPRAY CANAL

                                                                                                   [Source      4511
                                                                                    [@@           IIM"'
                                                                                                          AIR I
<pb n="147" />

                                                                          132

                                                                   TABLE 8

                                                   COOLING WATER EVAPORATIVE LOSSES

                                                                                   EVAPORATIVE LOSS
                                               COOLING SYSTEM                      GPM            CFS
                                               Once-Through                      3901             0.91
                                                                                    03               03
                                                                                 6301             1.41
                                               Natural Draft Tower              35022             7.82
                                                                                 9503             2.13
                                                                                 6301             1.41
                                               Mechanical Draft Tower           38002             8.52
                                                                                 9503             2.13
                                                                                37002             8.22
                                               Spray Canal
                                                                                 4721             1.11
                                               Pond                             52502             11.72
                                                                                14103
                                             1 [78]
                                             2 [2031
                                             3 [2221

                     As C increases, blowdown makeup decreases. The values below are representative
                     of this relationship (based on Ev                  21.4 cfs and D = 0.05 cfs):

                                         -C                                               B (cfs)

                                           1.2                                            107
                                           2                                                 21.4
                                           5                                                  5.3
                                          10                                                  2.3
                                          20                                                  1.1       [441; p.27]

                                In summary, water withdrawals can range from approximately 9,300                             gpm
                     (21 cfs) to 800,000 gpm (1,800 cfs), depending on the temperature rise and
                     cooling system used (203]. Site selection depends on a water supply adequate
                     for-normal plant generations as well for long-term low-flow conditions. For
                     once-through systems, plants are limited to locations where large quantities
                     of lake water are economically available. There are few river locations in the
                     basin-adequate for even closed-cycle plants.
<pb n="148" />

                                                 133

                           (d)  Transportation access
                   Transportation access requirements for coal-fired power plants relate
           primarily to fuel delivery and, in some cases, waste disposal, if disposal is
           off-site. However, it is also important during the construction    .phases for move-
           ment of workers, heavy equipment, and materials to the site.
                   Coal deliveries to the plant are generally made either by rail br,water
           (ship or barge). Because a modern 1000-MWe plant may require 8,000 to 10,000.
           tons of coal per day, delivery by truck, except at minemouth plants, is usually
           done only to supplement rail receipts. For the scale of facilities discussed,
           in this report, trucks cannot provide sufficient deliveries to make them the

           primary suppliers.
                   Another delivery system not considered to be a major factor in future
           coal movement to plants in the Great Lakes Basin is the slurry pipeline.     While
           coal slurry pipelines can be used to move large volumes of@coal over long dis-
           tances, the easy availability of cost-competitive alternatives in the basin
           makes the development of such a system unlikely.
                   The most common rail delivery system is a dead-end line into   the plant
           with 75-120-car-unit trains (100 tons per car) used to move the coal   from the
           mine to the plant J221]. Approximately 200 trainloads per year would.be re-
           quired, or one every day-and-a-half for this studyls generalized 1000-MWe coal-
           fired plant. By designing the unloading facilities around the train configura-
           tion it is possible to reduce operating costs as well as provide a continuous
           supply of coal. In addition, the reduced turnaround time means lower freight
           rates, important in the economics, of large coal plants [2211.
                   Receipt of coal via water borne carriers requires a site   with harbor
           access. A naturally deep harbor in which extensive dredging can    be avoided is
           ideal, although suitable harbors can be developed if necessary.
                   Barges with capacities in the range of 500 to 3,000 tons draw up to 12
           feet of water. A 1000-Me plant should have "harbor, docking, and unloading
           facilities capable of handling 3 to 7barges per day" [221; p.13]. Gravel-
           filled sheet pile cells with barge unloading cranes on 80-100-foot centers pro-
           viding 600-1,000-foot- long docks are generally used [221].
                  'Movement of coal by-lake vessel is an important alternative in.the

            At present, the laT'gest planned slurry pipeline will deliver 330 tons of
           pulverized coal slurry per hour over a distance of 275, miles.
<pb n="149" />

                                                    134

              Great Lakes basin. For example, the proposed Belle River plant, (Detroit Edison)
              would receive western coal from Superior, Viisconsin by lake vessel; "these

              freighters will have a capacity of 45,000-60,000@tons and unload at a rate of
              approximately 7,000 tons per hour" [526; p.471. These large carriers, re-

              qUiring drafts up to 26 feet, can provide large volumes of coal per delivery,
              reducing the need for a constant stream of coal to the.site. In addition,
              many of these vessels.are self-unlo aders, obviating the need for extensive dock-
              side works (see the section of Coal Transshipment and Storage Facilities for a
              more complete description).
                      It is desirable to provide dual access by rail-and water. There are
              two important reasons for this. First, there may be some uncertainty as to the
              long-term (over the life of'the plant) source.of coal as environmental and
              economic conditions change.  Second, there is a ne6d-to protect against possible
              work stoppages in one mode that could cause fuel;shortages. Thus, while either
              mode may provide sufficient delivery capacity for-the facilities.considered
              here, it is desirable to maintain options for both.
                      It is also desirdble.to locate nearsthe existing bulk  transmission sys-
              tem. The existence of a major network of EHV and UHV (765#V)@   transmission.lines
              constrains, to some extent, the location of major new generating:.fac.ilitios.
              The desire to reduce costs while maintaining a high levels of reliability and
              flexibility makes tie-ins to the existing system generally preferable to the@
              construction of major new carriers. There are, of course, exceptions when sys-
              tem expansions-are desired or when current'capacity is reached.

                              (e) Seismology and geology
                      There are no special geologic..of seismological requirements for the
              siting of coal-fi.red plants other than that-a satisfactory foundation for the
              plant structure be available and that there should be no active faults.

                              (f) Hydrology and meteorology
                      The most,important meteorological requirements  relate,-to the  dispersion
              of air pollutants generated by the facility. It is important that.account   be
              taken of prevailing winds and that the facility be sited so that.;particulates*
              and other pollutants will not be blown to nearby-population concentrations.
                      The most important hydrological requirements,are related,to the cooling

              system requirements.  Generally, for consumptive uses of s tream waten, the
<pb n="150" />

                                                 135

           average withdrawal rate should be no greater than one-third of the 10@year-7-day
           low flow. In addition, the thermal effluent receiving body should be capable of
           rapidly dispersing the heated return flow. Finally, the receiving body must be
           able to adequately dilute and disperse the blowdown  effluent.
                   Other:hydrological requirements relate to the protection of surface and
           ground-water resources against contamination from other sources: leachates and
           runoff from the coal storage and waste disposal areas, storm runoff from the
           plant in general, and sanitary wastes from the plant water supply system.

                       (3) Environmental and-Other Considerations

                   In addition to the resource requirements discussed   above, there are
           several additional factors that enter into a facility siting decision. -One.
           such factor is the availability of sites previously acquired by the utility.
           Major utilities keep an inventoryof facility sites purchased in the past for
           future plant development.   Then, as new capacity additions are req Iuired, the
           utility will look first at  these sites to determine which,,if any, are suited'.

           to-the proposed addition.   It is important to remember that many of these sites
           were purchased ten or more  years in the past, when site selection criteria.and
           plant design were somewhat  different than today. Thus, it is likely that some
           of these available sites might not be suitable by today's standards.
                   Another factor.that is especially.important in siting fossil-fuel
           plants is ambient air.quality. The construction of new base load capacity will
           be limited only to those areas where ambient conditions with the new facility

           meet national standards.

                   Overall environmental impact of the facility will also influence the
           location decision.process. A site will be selected that minimizes impacts on
           aquatic and terrestrial ecosystems. This includes avoiding (or preservifig)
           fragile habitats, locating away from sensitive areas, etc.. Clearly, this..
           policy has not been followed in all cases in the past. However, as'environ-
           mental reporting and analysis standards became more defined and stringent,.
           these considerations will become more important. One result of this effort has
           been the increase in multiple purpose site planning by the utilities, pr   ovid-
           ing public access to certain areas of the site.for recreational activities
           (this is more common on nuclear power plant sites).

            .See discussion of EPA for details of air pollution control program, Chapter III.
<pb n="151" />

                                                   136

                     A final consideration is public acceptance of the proposed facility.
             This aspect of the facility planning process is becoming more and more important.
             To a large extent, the mitigation of public opposition is tied to the environ-
             mental sensitivity demonstrated in selecting the site and preparing the site
             plan. Opposition can also be reduced by public involvement in the pite selec-

             tion process. Many of the policy options described in this s  tudy are designed
             to minimize this opposition, resulting in a better, more holistic facility
             siting process.

                         (4) Emerging Technologies
                     Within the time span of this study (15-20 years) there are not expected
             to be any major new technological breakthroughs in the generation of electricity
             from fossil fuels. Those technological advances that do occur will be based on
             presently demonstrated technology applied to large-scale operations.. Even then,
             these changes would not be seen until the mid-1980's.

                     Areas in which.changes can be expected to occur in the near- to mid-term
             are fuel combustion,.power conversion, and air quality control. Fuel combustion
             technology is related to the manner in which the fuel (coal, in this case) is
             burned. Power conversion is related to the manner in which the energy released
             by the combustion process is used to generate electricity. Air quality control
             refers to the alternative techniques available to reduce air emissions (pri-
             marily sulfur dioxide) from the combustion process. Any given change in tech-
             riology may affect all three areas. For ease of discussion they have been
             grouped as follows:

                             Fuel combustion        fluidized bed
                                                    low Btu coal gasification
                                                    combined coal-solid wastes
               See Scenario Four, Applied Emerging Technologies, in Chapter V.

               A completely new technology that may be available in the next 20-50 years is
             the fuel cell generator. The fuel cell is a sandwich-like device.with two
             electrodes separated by an electrolyte. A'fuel (low Btu synthetic natural
             as, for example), is fed to one, and an oxidizer to the other. A DC current is
             produced by the resultant oxidation reaction. Efficiencies near 70 percent
             are projected for a 1000-MWe central station unit using one process currently,
             under development [222]. Such a unit would produce chemical pollutants similar
             to those produced by conventional processes, except that NOx emmissions would
             be reduced due to the lower operating temperatures. "However, the fuel cell
             is particularly sensitive to pollutants, such as sulfur, now causing concern
             in conventional steam turbine plants. Thus, the pollutants must be removed@
             prior to the fuel cell system" [222; pp.12-33).
<pb n="152" />

                                                 137

                          .Power conversion       combined cycle generation
                           Air quality conirol    (too numerous to identify
                                                  individual.processes)

                  Although the above list does not include all potentially important tech-
          nological advances, it is arepresentative sample of what is available.

                           (a) Fuel combustion

                               (i) Fluidized bed combustion
                  The following description [222; pp.12-18] summarizes this process and
          its advantages:
                  A fluidized bed boiler involves passing air upward through a
                  grid plate supporting a (several foot).thick bed of granular,
                  noncumbustible material such as coal, ash, or lime. The air
                  fluidizes the granular particulates and, with   the relatively
                  small amount.of air used to inject the fuel (usually coal but
                  possibly residual oil), serves as the combustion air. The heat
                  transfer surfaces or boiler tubes can be embedded in the
                  fluidized bed directly because-combustion takes place at iem-
                  peratures (approximately 1,500'F.) that will not damage the
                  tubes.

                  The fluidized bed boiler  has two basic advantages: the ability
                  to burn high-sulfur coal  with low-sulfur dioxide.(S02), par-
                  ticulate,.and to some extent, NOx emissions;.high heat release
                  and heat transfer coefficients,that can drastically reduce
                  boiler size, weight and co st. This means that fluidized bed
                  boilers.can.be built as factory-assembled, packaged units,
                  shipped to sites, and arrayed as required. These factors
                  will considerably reduce construction times for new power
                  plants..

                    study by the Battelle Columbus Lab [545] estimated that a 600-MWe
          unit (operating  at atmospheric pressure) might be one-half to two-thirds the
          size of a conventional boiler unit. Pressurized units (up to 10 atmospheres)
          might be even'smaller. Data   developed by Hittman Associates .[cited in 2221
          indicate'an even greater reduction in land required. Other potential advan-
          tages [545] include: lower capital costs (10-20 percent reduction) and opera-
          ting costs (5-15 percent reduction), possibly higher supercritical steam,,con-
          ditiIons (1,200*F. at 4,000 pisg), and reductions in ash  fouling, high tempera-
          ture corrosion and thermal discharges..
                  .The major disadvantage perceived at this time is the disposal of   large
          volumes of spent bed material  (limestone-or dolomote). However, because    this.
<pb n="153" />

                                                        138

               is a problem shared with other new (and existing) technologies, it may not be

               significant.

                                     (ii) Low Btu coal gasification
                       'A large part of the present energy research effort is directed toward
               perfectingmethods of converting coal to a substitute natural gas (SNG). Many
               of the methods presently under study are described in Reference 222. Of con-
               cern here are those methods which can be used to produce a low,Btu gas (heat
               value of 100-300 Btu per 1,000 standard cubic feet). Because it is generally
               not economical to transport such low quality gas [203] it must be produced at
               th6@'point of its use. In this context we are concerned with a combined coal
               gasification/electrical power generating plant. The gas produced by the gasi-'
               fication process can then generate electricity by using gas-fired boilers, com-
               bined cycle turbines, or gas turbines. (See references 203, 222, 545, and 400
               for detailed descriptions of the various processes and their associated resource
               requirements and environmental impacts.)_'

                                     (iii) Combined coal-solid waste combustion

                       A potentialsource of fuel in the future may be found in solid wastes.
               Because the energy value of such material is so low (generally 4,000-4,500 Btu/
               lb. as compared to 9,000-12,000 Btu/lb. for coal) the potential of 100 percent
               solid waste-fueled plants is quite low, especially for the size c      onsidered
               here.   However, it may be possible to utilize a mixture of coal and "clean"
               solid wastes (non7combustibles removed prior to burning). One report [5451
               indicates that use of wastes to provide 10-20 percent of the total energy input
               would not interfere with boiler operation.        Potential problems relate to
               chloride corrosion in the boiler/generation system and potential leaching,

               of incinerator solid wastes.

                                (b) Power conversion
                       The only method considered for this phase     of the power   generating system

                 A 1000-MWe power plant using only solid waste would require 24,000 tons/day
               based on the figures given above.

                  The Union Electric Company of Missouri has completed a      demonstration program
               and has decided to go ahead with a program to convert its      plants for burning a
               90 percent coal, 10 percent refuse mixture [Communication      with NPCC].
<pb n="154" />

                                                 139

           is the use of combined cycle power plant. While there are severaltypes of com-
           bined cycle units presently under development, a  typical configuration using gas
           and steam turbines is shown in Figure 5. It is essentially a combination of a
           standard gas turbine (similar to jet engine)  powered by hot gas (SNG) which is
           then,used to heat water in a boiler to power  a conventional steam turbine. It
           is estimated that a system likethis could achieve an efficiency of 40-42 per-,
           cent in the near future [2221.1 The Battelle Lab's report [545] projects effi.-
           ciencies of up to 50 percent.

                           (c) Air quality control
                   One of the major technological problems faced by   utilities in expanding
           their coal-fired generating capacity is meeting national   air quality and
           st ationary new source performance standards, especially with respect to   sulfur
           dioxide emissions. In response to this problem, a great    deal of research has
           been carried out on sulfur dioxide removal.systems. Unless the present re-
           gulatory posture is substantially altered, it can be-expected that one or.more
           or these systems will be used in the near future as new plants come on line.
                   Of the many sulfur dioxide removal methods presently under development,
           11the.most effective appear to be 'scrubbing' processes in which the stack gas
                                                                                          11
           is passed over or through a material that. reacts with SO to form a compound
                                                                     2
           [222; pp.12-13]. There are two@_ways to deal with the resultant compound: dump-
           ing it.at a disposal sit-e, which changes an air quality problem to one of solid
           waste handling and disposal "throw away'! method; or conversion to a useful
           sulfur product.with possible recycling of the absorptivematerial.     This latter
           method involves the added expense of installing a costly sulfur recovery plant.
                   Figure 6,illustrates three sulfur removal methods using lime'or lime-
           stone as the reacting material. Present indications arethat the electric util-
           ity industry favors-lime and limestone throwaway processes for several reasons:
           f1relative simplicity, relatively low investment, and freedom from the problems
           of marketing and making a by-product" [222; pp.12-131. The three methods in
           Figure 6 are:
                   Introduction of limestone directly into@the scrubber.   This is the
                   simplest route and seems to be the one favored by the power indus-
                   try.at present. The main drawback is that limestone'is not as

             Alternative sulfur control technologies not discussed in this report are-the
           techniques of coal cleaning and beneficiation used to remove'sulfur and ash
           prior to combustion.
<pb n="155" />

                                                    140

                                                 FIGURE 5

                                    SCHEMATIC DIAGRAM OF A COMBINED CYCLE

                                         GAS-STEAM GENERATING PLANT

                                 Exhaust Gas
                                                      Stearn
                                                   Turbine
                                                                                 Generator
                                               WWI'                        Cooling Water
                                                                 c 331
                           Boiler
                                                                         Condenser

                                                Pump

                                           Combustion
                       Fuel                    Chamber

                                                                            Generator

                                                         Gas Turbine
                                  Compressor

                                                                            [Source   222]-
                                 Air
<pb n="156" />

                                                            141

                                                       FIGURE     6

                                  SIMPLIFIED DIAGRAMS OF THREE LIMESTONE/LIME
                                      STACK GAS DESULFURIZATION TECHNIQUES

                                                          Gas to stock

                                       Stock
                                        gas
                                                                  COC
                                                     Scru er          03

                                                                              Settler

                                                         Pum                      COSO 3+  Co S04
                                                          tank                     to   waste
                           METHOD I.' SCRUBBER ADDITION         OF LIMESTONE

                                                         Gas to stack

                                      Stack                     Co (0 H)
                                       gas                    .4
                                                                  Pump
                                                     Scrubber    tank

                           Coco 3     Calciner                               Settler
                                                  coo                               aSO3+ COS04
                                                                                      to waste

                           METHOD 2.    SCRUBBER ADDITION OF LIME

                                                         Gas to stack

                                          coo +gas

                                                                  Pum
                                      Boiler        Scrubber      tonkp
                           Coco =&gt;
                                5                 &gt;           Ju            Set t ler

                                                                                   CaSOA + CaSOj
                                                                                      t6- waste
                           METHOD 3. BOILER INJECTION
                                                      @Ga s t,
                                                         bb

                                                                                   C

                                                                                        [Source-2221
<pb n="157" />

                                                              142

                            reactive as lime, which makes it necessary to us        e more limestone,
                            install a larger scrubber, recirculate more slurry, grind the
                            limestone finer, or otherwise offset the lower reactivity..

                        *   Introduction   of lime into the scrubber. Scrubbing efficiency can
                            be improved by first calcining the limestone to lime (CaO) and
                            introducing-the.lime into the scrubber. However, the cost is
                            increased greatly over that for limestone slurry scrubbing,
                            since a lime kiln installation is expensive to build and operate.
                            Use of lime also increases the problem of deposit formation in
                            the scrubber (scaling).

                        *   Introduction of limestone into the boiler. The cost of calcina-
                            tion canbe reduced in power plants by injecting the limestone
                            into a boiler furnace. The gas then carries the lime into the
                            scrubber. Problems include possibility of boiler fouling, dan-
                            ger of over-burning and inactivating the lime, and increased
                            scaling in the scrubber when the lime enters with the gas
                            [222; pp.12-131.

                            Table 9 summarizes the status (as of January 1976)-of the present.and
                  projected development (by megawatt capacity) of flue gas desulfurization (FGD)
                  systems in the U.-S. B    y the end of 1976, approximately 10,000 MWe of FGD is
                  expected to be installed. The efficiencies for removal of SO             2 range from
                  approximately 40-90 percent and particulate removal efficiencies generally are
                  above 99 percent for those units designed for particulate removal. Most sys-
                  tems are being designed to operate at 80-90 percent efficiency [3361.

                                                            .TABLE 9

                          STATUS, NUMBER AND CAPACITY OF FLUE GAS DESULFURIZATION SYSTEMS

                                                                            No. of
                                       Status                               units   F:_
                                       Operational                           21       3,796

                                       Under construction                    20       7,026

                                       Planned

                                         Contract awdrded                    10       3,761

                                         Letter of intent                    10       3,911

                                         Requesting/evaluating bids            7      3,837

                                         Considering only FGD systems        40       19,797

                                       Total                                 108      42,128

                                                                                            13361
<pb n="158" />

                                                   143

                   The major resource requirement related to power plant siting that will

           change if these techniques are used is the amount of land,required. As dis-
           cussed earlier, the amount   of land needed for throwaway system waste disposal
           can be up to 200 acres beyond the normal plant requirements. In addition,
           facilities will be needed   for scrubber material (limestone) delivery and storage
           at the site. If deliveries are.made by water, this may increase the desirabil-
           ity of coastal locations.    Presumably, the same considerations as those related
           to fuel delivery would be   important.

                   b. Nuclear Power Plants

                        (1) Description
                   Nuclear power plants on-line at this time or planned for construction in
           the next ten years are almost uniformly light water-reactors (LWR). Figure 7
           shows diagrams of the two common LWR types presently in use. In the boiling
          -water reactor (BWR) water is converted to' high temperature/high pressure steam
           (5450F./1,000 psi) by the core and is used directly t    ,o drive the turbine, The
           pressurized water reactor (PWR), on.the other hand, has two heated water sys-
           @ems. Heat is picked up from the core by the primary,system (600'F./2,250 psi)
           and is transferred to the secondary system via a heat exchanger (the steam
           generator). Steam carried in the secondary system is then used to drive the
           turbine/generator system.
                   For purposes of comparison, a 1000-MWe nuclear power plant has be,en
           Selected as the unit, of analysis. It has been assumed that this plant operates
           at an efficiency of 32 percent with an average annual plant capacity of 65
           percent. Average operating life is assumed to be 30-35 years.
                   Use of a 1000-MWe plant size does not take into account the potential
           for multiple-unit facilities with combined nameplate capacities of 3000 Mwe and
           above.   Because this clustering of 2-4 units on one site seems to be the pre-
           sent trend, it is important to recognize this practice and examine its effect
           on the resources required. Efforts will be made, therefore., to indicate how
           resource requirements change as capacity is raised above 1000 MWe.

            Nameplate capacity is the power production    at 100 percent output; actual out-
           put is nameplate capacity multiplied by load factor, generally about 65-percent
           of this (as assumed above).
<pb n="159" />

                                                                           144

                                                                     FIGURE       7

                                                                                                            LOW
                                                                                                         PRESSURE
                             SEPARATORS                                                                  JUR  INE                 .GENERATOR
                                DRYERS
                                                                           .........                  ...........
                                                                         ......... .

                                                                           HIGH
                                                                        PRESSURE                                                COOLING
                                                                         TURBINE                                               WATER PUMP
                            REACTOR
                            PRESSURE  '.FUEL.
                           VESSEL                                                          CONDENSER                                     WATER
                                                                                                         ............
                                                                                                         ..........

                                                                                 FEED
                                                       REACTOR                  WATER                          CONDENSATE PUMP
                                                       FEED                     HEATER
                                   CONTROL RODS        PUMP
                                        DRIVES

                                                                     FUEL Slightly enriched uf3nium oxide c1A with zirconium allay
                                                                     MODERATOR Boiling water
                              GENERAL ELECTRIC                       COOLANT Wling water
                                                                     PRESSURE OF PRIMARY SYSTEM 1.000 p!d
                                                                     OUTLET TEMPERATURE 550P F

                                                       Boiling Water Reactor Power Plant

                                                                                                                      LOW
                                                       PRESSURIZER                                                 PRESSURE
                                                                                 SEPARATORS                         TURBINE         GENERATOR
                            CONTROL RODS                                          &amp; DRYERS
                             &amp; DRIVES

                                                                                              HIGH
                                                                                             PRESSURE                         COOLING
                                                                                             TURBINE                        WATER PUNIP
                            REACTOR                                               STEAM
                            PRESSURE                                             GENERATOR                                                COOL114G
                                                                                                       CONDENSER
                              VESSEL    FUEL                                                                                               WATER

                                                                                                     FEED
                                                                                    FEED            WATER
                                                                                   WATER            HEATER                CONDENSATE PUMP
                                                              PRIMARY               PU."IP
                                                             COOLANT
                                                              PUMP
                                                                                          FUEL Slightly enriched uranium oxide cl3d with zirconium v,'Ioy
                                                                                          MODERATOR Water
                                BABCOCK &amp; WILCOX                                          COOLANT Water
                                COMBUSTION ENGINEERING                                    PRESSURE OF PRIMARY SYSTEM 2,25Dpoundi per iquve inch
                                WESTINGHOUSE                                              REA CTOR.OUTLET TEMPERATURE 60.5e F
                                                                                  &amp;
                                     UF@

                                                    Pressurized Water Reactor              Power Plant

                                                                                                               [Source        203]
<pb n="160" />

                                               145

                      (2)  Site Requirement7s

                          (a) Land requirements
                 An analysis of 75 existing and proposed nuclear power plant sites  shows
         a size range from 84 acres to 30,000 acres, with an average of 2,730 acres [data
         in 208]. Further analysis of the same data,indicates that the average station
         size (including power house, reactor, and related buildings, cooling structures,
         but not including ponds or canals and onsite switching and transmission equip-
         ment) is 1.35 acres, or roughly 5 percent of the total site area. Excluding
         those facilities using cooling ponds or canals for cooling the average total
         site and station sizes are 1,335 acres and 123 acres, respectively. This
         indicates that, even without cooling systems requiringa large land commitment
         (i.e., ponds and canals), nuclear sites are much larger than strict generating
         requirements dictate.
                 A large part of this additional land requirement is for the provision of
         an exclusion zone, within which the operating utility has "authority to det er-
         mine all activities including exclusion or removal of personnel and property
         from the area" [442; p.20]. This requirement will be dealt with more fully in

         the next section.

                 Because the conversion efficiency of a nuclear power plant is 32 per-
         cent, as compared to 38 percent for fossil fuel plants, the total heat rejec-
         tion per kilowatt hour is substantially higher. In addition, while 10 percent
         of the thermal waste produced by a fossil plant is lost up the stock, essen-
         tially all goes into the cooling water system from a nuclear plant. Thus,
                                                                                        9
         total heat rejected by the nuclear facility considered here would be 4.71 x 10
         Btu/hr, as compared to 3.26 x 10  9 Btu/ hr for a similar size fossil fuel plant.

                 This higher heat rejection rate results in an increase in.cooling sys-
         tem requirements, both in terms of flow across the condenser [discussed in Water
         requirements, Section IV.A.3.b(2)(a)] and land required for the system compo-
         nents. Table 10 lists the land required for cooling systems of both nuclear and
         fossil fuel plants. As can be seen from these figures, a nuclear plant re@
         quires 50 percent more.land for its cooling system than does a similar capacity

         fossil fuel plant.

                 There are several additional considerations which determine the size
         of the site required. For example, additional land may be needed to provide
         adequate noise buffering, especially in the case of mechanical draft
<pb n="161" />

                                                      146

               cooling towers. Another important consideration is the necessity to limit the
               potential impact of water vapor plumes from the cooling system. Although this
               aspect of plant siting is not specifically subject to federal or state regula-
               tion, it must be considered by the utilities in their site selection procedure

               and envrionmental report preparation.

                        There are other considerations  that are not included above. For exam-

               ple, multiple use areas for controlled   public access to shoreline areas and
               cooling ponds, farming and grazing, and use of other inactive areas on the site.
                        In.moving fiom a single 1000-MWe plant to a multiple unit facility of
               2000-4000 MWe, several factors related to total land required will increase.

               First,,it is important to note that the exclusion zone requirement is not based
               on total plant capacity and willnot change for a given site as that capacity
               isincreased. Land requirements that may change include those for cooling,
               noise abatement, plume dispersion, and the plant itself. The degree of this
               change is not known and probably is site-specific.

                        Based on the,material given above, it is difficult to postulate a
               11typical" site size for nuclear facilities. Given the figures for the various
               components that determine site'size, a range from @20-3,500 acres wo,   Iuld seem
               reasonable.     Multiple unit sites could range up to 10,000 acres if cooling

               ponds were used.

                                (b)  Location with respect to population
                        As mentioned in the previous section, there have been regulations pro-
               mulgated by the AEC,  now administered by the NRC, regarding the location of
               nuclear power plants  with respect to population. In general, "long standing
               policy of the Atomic  Energy Commission [now Nuclear Regulatory Commission] has
               encouraged siting nuclear power plants away from densely populated areas...
               [2071. Title 10 CFR Part 100.(Statement of Consideration, Reactor Site Cri-
               teria, published in the Federal Register, April 12, 19621 specifies a three.-
               tiered system of population-related locational criteria that must be,met in

                 off-site effects of water vapor plumes are also considered by utilities in
               selecting fossil fuel plant sites, although environmental reports are not
               required.
                 An. exception to this is New York State-, which regards cooling tower drift'as
               a settleable particulate, subject to numerical regulatory criteria.

                  Assumes a minimum exclusion area radius of 0.4 miles [570] and a     plant size
               of 100 acres. The only explicit variable is cooling system size.
<pb n="162" />

                                                147

          siting a nuclear facility. The three criteria,illustrated in Figure 8, are:

                  An exclusion area, which is that area surrounding the reactor in
                  which the reactor licensee must have theauthority to determine
                  all activities including exclusion or removal or personnel and
                  property from the area. Activities unrelated to operation of the
                  reactor may be permitted in an exclusion area under appropriate
                  limitations, but the licensee must be in a position to clear the
                  area promptly i'n the event of an emergency.' For example, the
                  area may be traversed by a highway., railroad, or waterway, pro-
                  vided these are not so close to the facility as to interfere
                  with normal operations of the facility and provided appropriate
                  And effective arrangements Are made to control,traffic on the
                  highway, railroad, or waterway in case of emergency.

               e  A low population zone., immediately surrounding the exclusion area
                  in which the total number of residents And the population density
                  are small enough to provide a reasonable probability that appro-
                  priate protective measures could be taken it their behalf in the
                  event of a serious accident. AEC's regulations do not specify
                  a permissible population density or total population within this
                  zone because the situation varies from case to case. Whether
                  a specific number of people can, for example, be evacuated from
                  a specific area, or instructed to take shelter, on a timely
                  basis will depend on many factors such as location, number and
                  size of highways, scope and extent of advance planning, and
                  distribution of residents within the area.

                  A population center distance, which is the  distance from the
                  reactor to the nearest boundary of a densely populated center
                  containing more than about 25,000 residents.
                                                               [442;@p.201

                           (c) Water requirements
                  Because of the significantly higher heatrejection rate, the cooling
          water requirements for a nuclear power plant are substantially higher than
          those of a fossil fuel plant of similar capacity. Table 11 compares the flow
          required across the condenser for the fossil fuel and nuclear plants considered
          here for different temperature rises. As can be seen, flow requirements are
          two-thirds higher for nuclear plants for a given temperature rise.
                  Estimated water-consumption rates for cooling system alternatives have
          been compiled from various sources and are shown in Table 12. Because of the
          wide range of values and a lack of uniformity in assumptions  among sources, it
          is difficult to estimate an average consumptive rate for any  given cooling
          alternative. A range-of  0-30 cfs would not seem unreasonable.
                  There are, of course, other water requirements for a nuclear facility
<pb n="163" />

                                                                          148

                                                                     TABLE 10

                                                   COOLING SYSTEM LAND REQUIREMENTS

                                                                                 Nuclear              Fossil Fuel

                                     Once-Through                                        1                    1
                                     Natural Draft Cooling Towers                       15                   10

                                     Mechanical Draft Cooling
                                      Towers                                            68                   45

                                     Spray Canals                                    150                   100
                                     Cooling Ponds                                  3000                  2000

                                                                                                               [Source       203]

                                                                         FIGURE 8

                                           DEFINITION OF EXCLUSION AREA LOW POPULATION ZONE

                                                          AND NEAREST POPULATION CENTER

                                                                                          'NEAREST POPULATION
                                                                                          CENTER, POPULATION
                                                                                          GREATER THAN
                                                                                          25,000

                                                                             C

                                                                      Z           DWANCE C MUST BE GREATER THAN
                                                                                  4/3 DISTANCE Z

                                                                                  IN LOW POPULATION ZONE
                                                      REACTOR                        PERSONS SUBJECT TO PROTECTIVE MEASURES
                                                  EXCLUSION AREA                    b) MAXIMUM BODY DOSE 25 REM, AND MAXIMUM
                                                                                     DOSE TO THYROID 300 REM FROM EXPOSURE
                                                                                     DURING TIME OF PASSAGE OF RADIOACTIVE
                                                                                     CLOUD RESULTING FROM ACCIDENTAL
                                               LOW POPULATION ZONE                   RELEASE

                                                                                  IN EXCLUSION AREA
                                                                                    a)HIGHWAYS, RAILWAYS, WATERWAYS SUBJECT
                                                                                     TO CLOSURE
                                                                                    b) PERSONS SUBJECT TO EVACUATION
                                                                                    c) PERSON MUST NOT RECEIVE MORE THAN 25
                                                                                     REM'TOTAL BODY DOSE OR MORE THAN
                                                                                     300 REM TO THYROID FROM TWO HOURS'
                                                                                     EXPOSURE.

                                                                                                    [Source 451]
<pb n="164" />

                                                    149

                                                TABLE 11
                                   REQUIRED C50LING WATER FLOW RATES*
                                                       Change in_.Temperature (OF)
                                                 30                 20               10
                                                                        cfs!
                                            gpm        cfs    gpm               gPm       cfs

                        Fossil Fuel       269,400      600   4
                                                              04@100@1  900     808,200  1800
                         Nuclear          449,000     1000   673,500@  1500   1,347,000  3000

                          Figures from Figure 2

            beyond cooling.    An example of a water flow system through a nuclear facility,
            proposed Enrico Fermi Units (1075 MWe), is given in Figure 9 and Table 12 [from
            5511. As can be seen, these other flows are not significant when compared to
            cooling needs. Total withdrawals are 22,545    .gpm (50.2 cfs) on an annual average
            basis,.with a total consumptive loss of 11,610 gpm (25.9 cfs).
                    In summary, nuclear power facilities require significantly more water
            than do similar sized fossil fuel plants, due primarily to differences in ther-
            mal efficiency.   A lower bound of .13 9 4 7 0 to 17, 960 gpm (30-40 cf S) withdrawal
            rate with a consumptive rate of about-11,225 gpm (25 efs) is not unreasonable
            for an efficient closed-cycle. system. A withdrawal rate of one million gpm
            (2,230 cfs) for a once-through system with some consumptive loss prov     .ides
            an upper bound (assuming a 15'F temperature rise across the conden     ser).
                    The above discussion is based on a single unit 1000-MWe reactor. For
            each additional unit added, the water requirements given above should be in-
            creased by a similar amount. This does not, take into account possible water use
            economies of scale that may be available, although it does provide a reasonable

            rule of thumb.

                             (d) Transportation access

                    Good transportation access to a nuclear facility site is required for
            movement of fuel and wastes, and delivery of large components during the con-
            struction phase. Unlike the case of a coal-fired plant, large volumes of fuel
            are not required on a continuous basis; figures from the Fermi 2 unit are shown
            in Table 13. In addition, nuclear waste materials (primarily spent fuel) must be

              The same is true, of course, for fossil    -fuel plants, although it was not
            discussed at that point.
<pb n="165" />

                                                       150

                                                    TABLE 12.

                                 NUCLEAR POWER PLANT CONSUMPTIVE WATER USE

                                                                     gpm       cfs

                                                                 4520 1      10.1 1
                                 Once-Through                    3590 2        82
                                                                      3         3
                                                                 5840        @13
                                                                      04       04

                                                                 7240 1      16.1 1
                                 Natural Draft Tower             8530 3      19 3
                                                                12030 4      26.8 4

                                                                 7240 1      16.1 1
                                                                      2         2
                                                                12570        28
                                 Mechanical Draft  Tower              3         3
                                                                 8530        19
                                                                12030 4      26.8 4

                                 Spray Canal-'                  11670 2      -262

                                                                 5440 1      12.1 1
                                 Cooling Pond                    6290 2      14 2
                                                                      3         3
                                                                 9880        22
                                                                      4          -4
                                                                .17740       39.5

                                    [781
                                 2  [207]
                                 3  [511, assumes 1200 MWe
                                 4  (2221
<pb n="166" />

                                                                                                                                                          FIGURE 9

                                                                                                                    FERMI 2 (DETROIT EDISON) WATER USE SYSTEM

                                                 7             WAI n 7,@._E.,     JWAO@E.- TO                          MAXEVP TODEMINERALIZEDWATER SYSTEM
                                                               PLAN               . A 'E   -TEN
                                                                   (FERMI 11      SYSTEM               PO ABLE WATER
                                                                                                       SYSTEM                                                                                        A..-

                                                               DISCHARGE FROM SEWAGE     rSEWAGE1
                                                               TREATMENTPLANT              TRIAT- 1_..          2
                                                                                                                                                Ul   11         10     it                                         265
                                                                                                                                                                                                                    0.
                                                                                         IFERN111 I$
                                                                                                                                                RHRSWS          R"RSWS
                                                                                                                                                MECH '          NEG..
                                                                                                                                                DRAFT           DRAFT
                                                                                                                                                COOLING         CODUN
                                                                                                                                                IOMR            TOWER

                                                                                                                                                                               n
                                                                                                                                                                                       SLOWDOWN TO
                                                                                                                                                                                       CIRCULATING
                                                                                                                                                                                12
                                                                                                                                                                                       WATER RESERVOIR
                                                                                                                                                "News RESERVOIR
                                         0

                                                                                                                                        RH Sm to PLAN                      UP
                                                                                                                                                                       "HASINS
                                                         S                                                                                                             RESERVOIR
                                                                                                                  IL
                                                                                                          SANITARY WASTE
                                                                             XIL=.                                                                                                                            MAKEUP TO PLANT SYSTEM
                                                                      BOOLE                                                                             PLANT
                                                                                                                                                                       GSW 0  ISCHAFIGE
                                                               FALL
                                                            AGOGIN
                                                                                                                                                                       CHIC. WATER DISCHARGE        I
                                                                                                                                                                                                                                                                                                                 F_

                                         LA F
                                         EFHE                                                                                                                                                     14
                                                                                                TION
                                                 FERMI 1                                                                                             3
                                                 INTAKE CANAL
                                                                                                                                                                              CHLORINE
                                                                                              as" LINE                                                                        ADDITION

                                                                                 MAKEUP ONE

                                                                                                                                                CIRCULATING WATER
                                                                    DECANT LINE                                                                 NOW HOUSE
                                                                                                                                                                                                              NATURAL                    NATURAL
                                                                                                                                                                                                              DRAFT                        AIT
                                                                                                                                                  CIRCULATING                                                 COOLING                    C  LING
                                                                                                                                                  WATER                                                       TOWER           --ill      T  'R
                                                                                                                                                  RESERVOIR
                                                                                                                                                  11.5 ACRES                DISCHARGE FROM C T@ BASIN

                                   a             GENERAL SERVICE WATER SVITEM                                                                                                                                                                                ENF31CO FERMI ATOM              IC  POWER PLANT
                                   RHRSM-REDDUAL HEAT REMOVAL SERVICE WATER SYStEM                                   t                                             DEMINFRALIZER WASTE SOLUTIONS 11%                                                                                UNIT 12
                                   CIRC-CIACULATING                                                                                                                                                                                                                  ENVIRONMENTAL REPORT
                                   CT.-COOLIMO TOWER
                                   (Do           Gen" I-
                                   (D&amp;D ... O'COIRATIVIC L-1111M.                                                                                                                          iiy
                                                                                                                                                                                                                                                                              PLANT WATER USE
                                                                                                                                                                                                                                                                                (SHEET I OF 2)

                                   OEFS-K
                                                                                         MIF

                                                                                                                                                TO PLANT               5-MISZWKSE
                                                                                                                                     VR.II.T
                                                                                                                                                                       N
                                                                                                                                                                         Al
                                                                                                                                                                       .E.,

                                                                                                                                                                             C.L_R III
                                                                                                                                                                             AGO

                                                                                                                                                                                                              NATURAL
                                                                                                                                                                                                              D.AF.N.
                                                                                                                                                                                                              COOL
                                                                                                                                                                                                                      -7

                                                                                                                                                                                                                                               [Source 551]
<pb n="167" />

                                                                                         -TABLE 13

                                                                                    KEY TO FIGURE        9

                                                                         FLOWS OF MAJOR PLANT STREAMS

                                                                                 A erage Flows Under Full Power OReration, gpm                         Average,
                                                                                     Minimum               Maximum            Annual    (a)            Shutdown
                           Point:                                                Monthly Avg.          Monthly Avg.            Average                 Flow, gpm

                             (1)   Required reservoir makeup
                                   in addition to GSWS flow                                  0                7,900                3,580
                             (2)   Reservoir evaporation rate                              110                  150                 130              110 - 150
                             (3)   Condenser cooling flow       (b)                   840,000              840,000              840,000                   0

                             (4)   GSWS flow                                          12,000-               27,000               18,950           10,000  -  12,000
                             (5)   Drift loss from cooling-towers         (c)              900                  900                 900                   0

                             (6)   Evaporation loss from
                                   cooling towers                                        8,740              12,220               10,560                   0

                             (7)   Makeup to water treatment plant                           12                   17                   15              12 - 17
                             (8)   Makeup to RHRSWS     (c)                                  0                    0                     0                430
                             (9)   RHRSWS flow to plant       (c)                            0                    0                     0              9,000

                           (10)    Drift loss from RHRSWS
                                   cooling towers(c)                                         0                    0                     0                 20

                           (11)    Evaporation from      RHRSWS
                                   cooling towers(c)                                         0                    0                     0                220
                                                         -    (c)
                           (12)    Blowdown from RHIRSWS                                     0                    0                     0                200
                           (13)    Blowdown from     circulating                                                                                             (c)
                                   water reservoir                                     10,000               12,200               10,900               10,000
                           (14)    Total flow to cooling towers(c)                    900,000              900,000              900,000                     0
                           (15)    Ion exchange regenerant waste flow                      0.7                  0.7                 0.7                  0.7
                           (16)    Blowdown from auxiliary boilers                           &lt;1                   1                 0.8                     1
                           (a)Calculated at 100% plant capacity.             Expected plant capacity factor is 80%.
                           (b)Rated flow.,
                           (c)Approximakte.

                           EF2-CR-148-0
                           B-15-74

                                                                                                                                              f-Source 551]
<pb n="168" />

                                                 153

          removed from the plant site for reprocessing or disposal; figures on expected
          waste shipments from Fermi 2 are also included in Table 14. However, while.,the
          annual tonnage of materials moved may be relatively small, the potential (and
          realized) problems can be quite significant, especially with regard to waste

          transport:
                   Shipment of spent fuel from the reactor to nuclear fuel repro-
                   cessing'plants is the most complicated and expensive shipment
                   in the nuclear fuel cycle. The large amount of shielding needed
                   for a shipping cask designed to carry a single pressurized water
                   reactor (PWR) fuel element brings the cask's empty weight to
                   about 50,000 pounds. The tractor, trailer, and clask will
                   have a gross vehicle weight in excess of the 73,000 pound
                   highway limit which most states impose. Thus, special over-
                   weight permits will be required in many cases for shipment of
                   spent fuel by truck. On the other hand, rail,transported
                   shipping casks are envisioned which will carry seven elements
                   per cask and will have a loaded weight close to 200,000 pounds.
                   However, not all reactor sites have rail facilities immediately
                   available at the fuel storage area and some reactor sites
                   equipped with rail facilities cannot obtain rail service
                   because local railroads have refused to transport fuel [203; p.127].

          Because of the potential for long-term catastrophic impacts if an accident should:"
          occur during transit, it is important that safe routes be,guaranteed over the
          life of the plant. Careful consideration of the long-term implications of an
          accident (such as a container leak) should be made before a transit plan is

          approved for a specific facility, especially if all or part of the route in-
          volves waterborne movement [6251.
                   The second aspect of nuclear facility siting concerned with transporta7
          tion access is related  to the delivery of construction materialand major plant

          components:
                   The site should preferably be convenient,to ei.ther bodies of water
                   or rail,or road corridors of sufficient width and load-carrying
                   capacity to enable the de livery of construction materials and
                 ,equipment amd major reactor an 'd turbine components without unac-
                   ceptable disruption of the surrounding environment [207; p.107].

                   Many of the plant components are very large and massive, so that "water
          access is espcially de sirablefor deliver of large shop-fabricated and assem-1
          bled reactor vessels, although field assembly is becoming more common" [442: p.81.
          For example,
                   For a PWR the reactor pressure vessel itself may be a steel con-
                   tainer 17 feet in diameter and 42 feet long with 9-inch thick
                   walls and a weight of 450 tons... The turbine-generator train may
<pb n="169" />

                                                          154

                                                     TABLE 14

                                EXPECTED FUEL AND WASTE SHIPMENTS FOR FERMI 2

                                                   FMSH FUEL

                                                  Assemblies     Truckloads     Enrichment    Total Wt.
                    Year         Load             Per Year        Per Year       (Wt% U)      7@ (KG)

                    1977     1 (1st Core)           764              24          1.90         142,000

                    1980     2 Ust reload)-         276              9           2.61           51,300

                    1981     3                      208              7           2.61           38,700

                    1982     4                      176              6           2.61           32,700

                    1983     5                      180              6           2.61           33,500
                    1984(a)  6                      188              6           2.61           34,900

                    (a) and annually thereafter

                                                     SPENT FUEL

                             Shipment       Total        Truckloads     Total Wt.    Ave. Burnup
                    Year       Number     Assemblies      Per Year       U (KG)       (MWD/MTU)

                    1980         11         276             138         50,400,         12,000

                    1981         2          208             104         37,700          18,200

                    1982         3          176             88          31,800          22,000

                    1983         4          180             90          32,400          23,500

                    i984,(a)     5          188             94          33,700          26,700

                    (a) and annually thereafter
<pb n="170" />

                                                  155

                   be as much as 18 feet indiameter by 200 feet long and weigh
                   3,900 tons. This component, too,.must be-shipped to the site
                   in major segments weighing'up to 500 tons [207; pp.107-1081.

                           (e) Seismology and geology
                   Specific regulations have been published regarding seismic and geological
          protection and.assessm'ent of risk for nuclear power facilities ("Design Bases
          for Protection Against Natural Phenomena," U.S.A.E@C. 10CFR, 50, Appendix A,
          and "Seismic. and Geological Siting Criteria for Nuclear Plants, "U.S.A.E.C.,
          10 CRF 100, Appendix A).

                   Natural disasters such as earthquakes, volcanic activities,
                   landslides, floodings, and tsunamis are potentially so
                   catastrophic that their possible occurrence at any site.
                   could be considered as sufficient cause to exclude the site
                   from further consideration" [207; p.14].

                   However, sites subject to flooding, but properly protected, can and have
          been used. Site characteristics related to soil stability and topography must
          also be considered. In general, however, slope instability will not "pose any
          direct  hazard to a nuclear power plant that   has been well engineered  to the
          environment" [207; P.151. Also,
                   Areas of actual or potential.surface or subsurface subsidence,
                   uplift, or collapse.that can result in such phenomena as ground-
                   water withdrawal or recharge, mineral extraction, cavernous or
                   karst terrain, and regional warping should be avoided [207; p.17].

          Finally, the potential for site inundation by seiches should be considered     care-
          fully before siting of a nuclear facility.

                           (f) Hydrology and meteorology
                   Among the factors important in determining "the magnitude of the radio-,
          active dose received by individuals and the population within 50 miles are...
          meteorology, and hydrology of the site and its surrounding environs" [203; p.1251.
                   Criteria related  to the hydrological and meteorological conditions,of a
          potential nuclear power plant site have been published [see, for example      207]
          and in some instances codified into the federal regulatory structure.
                   The most significant meteorological concerns are related to the potential
          problem of plume formation from a closed-cycle cooling device. As a
<pb n="171" />

                                                      156

               general rule, the plume from a natural draft tower will rarely extend to the
               ground, but rather will merge with existing clouds or evaporate before reaching
               ground level. On the other hand, plumes from mechanical cooling towers, ponds,
               and spray canals are more like ly to cause ground-level fog [207].
                        Specific consideration should be.given to the site dispersion clima-:-
               tology during the site selection and evaluation process:
                        A site should provide atmospheric dispersion of radioactive
                        effluents and wate heat sufficient to protect the surrounding
                        environment [207; p. 21].

                        Specific annual average Atmospheric dilution factors have been suggested
               by the AEC [207; p.2]]. It is also recommended that specific consideration be
               given to the cumulative effect of "wind trajectories passing over several scat-
               tered heat sources'! [20.7; p.22] on localities near the proposed site.
                        More specific recommendations are made with regard to shoreline sites:

                       .If cooling tower plumes or other atmospheric emissions could
                        deleteriously affect the residential, recreational, or other
                        human resources, then shoreline sites which have low over-
                        water diffusion rates and high over-land turbulent mixing
                        should be avoided. This especially applies to shorelines
                        where there are cold currents [207@; p.25].

               Two important factors have been identified in evaluating a shoreline site: the

               change in atmospheric stability that occurs at the land-air interface, and the

               change in wind trajectory that'occurs when air moves from the smooth   surface of
               the water to the irregular  land surface.

                        The major concerns related to plume dispersion are potential increases.
               in fog and ice formation in  the area surrounding the plant site. Plumes are
               formed when the effluent from the water-saturated cooling device fails to mix
               effectively with the.drier ambient air. The    degree of plume formation an d
               stability is determined primarily by air mixing (mech  anical and convective),
               temperature, humidity, and ambient air pressure.
                        At sites where the prevailing atmospheric conditions are less
                        favorable for thedissipation of visible water droplet plumes,
                        visibility hazards to transportation and navigation may result.
                        In particular, environmental hazards may occur where water
                        droplet plumes from cooling towers or ponds result in fog
                        formation over corridors of land, sea, or air transportation.

                        Additional hazards caused by icing may result in areas under
                        the influence of cooling towers if ambient air or surface
                        temperatures below freezing are prevalent [207; P-311.
<pb n="172" />

                                                 157

           As mentioned before, fewer.fogging and icing problems can be expected from natu-

           ral draft towers than from other closed-cycle devices.

                   In the Great Lakes Region, there are several  important hydrological as-
           pects of a potential site than must be considered. There must be assurance of
           along-term uninterrupted water supply in amounts sufficient to meet the plant's
           needs. Careful consi.deration must be given to future development in the plant
           locality which could change the quantity of water available either for in-plant
           use or as a receiving body for thermal and chemical effluents. For streams in
           the Great Lakes Basin supplying principal consumptive requirements, lithe con-
           sumptive withdrawal should not exceed,50 percent of the lowest monthly mean
           flow of record unless reservoir capacity is included" [207; p.401. In addition,
           water withdrawals must be related to regional withdrawal agreements, where appli-

           cable.

                   With respect to ground-water resources, the AEC has stated:
                   Protection of groundwater [sic] supplies is needed for the
                   .qualification of a site as suitable for a nuclear power plant.
                   If groundwater is used by the plant, the sustained yield of
                   the groundwater,system should not be,exceeded, i.e., ground-
                   water mining would require special evaluation.

                   The location and use of groundwater at the potential site must
                   be considered in the selection process if any discharge of water to the
                   groundwater system, planned or inadvertent, may occur [267; P.431.

                   Statutory re quirements related to water quality are defined in sections
           401 and 402 of P.L. 92-500. All water effluents discharged from a nuclear power
           plant must conform to the limitations established under P.L. 92-500. Thus,
          @"designs associated with site options should in all cases minimize the discharge
           of any materials which contribute to lowering of water quality" [207; p.511.

                   There are several other important requirements in site selection

           decisions:

                   "Potential sites on waterbodies subject to heavy icing and blockage
                   need special consideration in order to assure continuity of water
                   supply. Because ice can impact upon structures, causing plugging
                   or structural failures, this factor should also be considered in
                   the selection of a site [207; p.541.

                   The site must accomodate a power plant design such that the mixing
                   of all heated or otherwise thermally modified discharges to
                   receiving'waters can be carried out within the formal mixing zones
                   established by applicable Federal or State regulations [207; p.57].
                   Waterbodies which are stratified at any time of the year need
<pb n="173" />

                                                                                   158

                                   special consideration of their vertical mixing characteristics
                                   if they are to be used for cooling water" [207; p.59],

                                          (3) Environmental and Other Considerations

                                   There are a number of further considerations that must be included in a
                      site selection and evaluation process. A general-consideration is the total
                      impact     of construction and operation on the terrestrial and aquatic ecosystems

                      in the     vicinity of the site. While there are several important specific aspects
                      to  this problem (see discussion below) the overall degree of disruption and
                      change engendered by the plant must be explicitly discussed. The importance of
                      these impacts will, of course, depend on the importance (as measured by scarcity,
                      system function, etc.)'of                 the ecosystems disrupted and the degree of the impact.

                                   Related to this is the question of the long-term effect of low-level
                      radioactive emissions on the plant and animal (including human) populations in
                      the plant vicinity. All nuclear power facilities produce some radioactive
                      effluents, both gaseous and.liquid, that are released into the environment. The
                      major concern is that these emissions will be taken up by plants and animals and
                      will become concentrated through the food chain (see Figure 10). The generic
                      issue of.long-term low-level emission affects are unresolved and are presently
                      under -study.
                                                                              FIGUFE 10
                                                PATHWAYS OF RADIATION THROUGH THE ENVIRONMENT

                         Critical                                                  e Pasturage    ------     @6- Animals                Dairy
                         Pathway for                                                                                                    Products

                                            Discharge of
                                            Radionuclides                                                         Farm
                                            In Gaseous               Air                 Crops                10  Products
                                            Effluents

                           Nuclear                                                    Fish &amp;                      Fish &amp; Shellfish              Human
                           Reactor                                                    Shellfish                   Processing                    Population

                                                                                                                  Recreational
                                                                                                                  Exposure
                                            Discharge of                                urf c
                                            Radionuclides            Surface            Water                     Edible
                                            In Liquid                Water              Supply                    Waterfowl
                                            Effluents

                                                                                        Ground

                                                                                         h &amp;
                                                                                      'is
                                                                                      She  @ish                             a 1@7
                                                                                                                            n

                                                                                        u  r. ce

                                                                     Ground                                       Drinking
                                                                                        Water
                                                                     water              Supply                    Water

                                                                                                                      [Source - 451]
<pb n="174" />

                                                   159

                   While this report has not dealt with the-nuclear fuel cycle and the
           problems of waste:handling and   storage, these,factors are important in the
           general decision to authorize or   encourage the,development of nuclear 'power
           plants.  Resolution of problems in these areas is paramount if a major commitment
           to nuclearenergy is to be made. Consideration of these problems must be a part
           of the decision to permit the continued shift to.a higher nuclear share in the
           electric power fuel  mix.

                   One problem  that has not been dealt with extensively to date concerns
           the eventual decommissioning of nuclear power plants. With a life expectancy of
           30-35 years,.utilities and the public at large will have to face this problem in
           the near future and consideration should be given to it now. One report [551]
           stated that a mothballed period   of up to 50 years would be required before "all
           areas of the plant site will be   available for unrestricted access" [551; p.59-62].
           This means that at least a portion of the site would    be committed to the facility
           for 80 years or more, a long   period in terms of land,use change and socioeconomic
           development.
                   Another consideration is whether there is a need for continuous cooling
           of the reactor throughout the   period prior to final decommissioning. If there
           is, then consideration should   be given to providing sufficient cooling water to
           meet this requirement. Ifa     closed-cycle system is used then potential problems
           .with maintenance of the system through this period of inactivity should be dealt

           with.

                   As with the other facility   types dealt with in this study, perhaps the
           most important determinan t of siting and site   requirements is public opinion.
           However, in the case of nuclear power plants,    the public acceptance factor is
           even more significant as there, are basic questions being asked about the d.esir-
           ability of.using it at all, as evidenced by the many recent State nuclear power

           referenda.

                        (4) Emerging Technologies
                   There are two principal technological alternatives to the light water.
           reactors presently in use: the high temperature gas-cooled reactor (HTGR), and
           the liquid metal fast breeder reactor (LMFBR). Only the HTGR is considered to
           be feasible (i.e., potentially applicable as a major producer in the commercial
           electrical energy market) during the period covered by this study. While the
<pb n="175" />

                                                     160

              LMFBR may-see some commercial use by the end of the study period, there are too
              many technological and political problems with it to make widespread use feasible.
                      The HTGR was available commercially,for a period although it has seen
              only limited use. Research and development on the process is continuing.
                      Figure 11 shows a cross-sectional view of the major components of a
              typical HTdR generating system. As opposed to the LWR system, the HTGR uses
              helium as a coolant and heat transfer medium. Because helium can be heated to

              higher temperatures and pressures than water, HTGR can achieve efficiencies of
              40 percent. The,fuel., -a mixture of uranium 235 and thorium 232, is formed into
              microspheres and embedded in a matrix of graphite blocks. While large quantities
              of thorium are not available today (primarily due to a lack of demand), economi-,
              cally recoverable reserves are thought to be available in sufficient quantities
              to supply a 100,000-Me capacity for.400 years [222]
                      HTGR proponents claim significant safety advantages over available LWR
              systems [222]. First, los's of the helium coolant does not represent as severe
              a problem as does the loss of the coolant water in a LWR, because the graphite
              core can absorb substantial amounts of heat. Second, the use of a prestressed
              concrete reactor vessel (PCRV) adds to the overall safety of the reactor by
              eliminating the worry of a primary pipe  rupture. Third, the  use of small,
              coated fuel pellets instead of large fuel rods reduces,the amount of radio-
              active material released to the coolant  should a fuel pellet rupture. Finally,
              the graphite core reduces the chance of  a major core meltdown.
                      Use of a direct-cycle system in which the helium is expanded through the
              turbine could raise HtGR efficiencies to 50 percent.

                      C. Fuel TransshkEent and St@qrage Facilities
                      Ports and terminals are being co nsidered as energy facilities insofar
              as they relate to the transshipment and/or storage of fuels and materiala
              associated with power plants, conversion facilities, and refineries. Because
              this category is represented by a wide variety of facilities,  it serves no use-
              ful purpose to attempt to establish a generalized definition of any one facility.
              However, these facilities may be classified according to the type of fuels or
              materials which they handle, e.g., coal, oil, or nuclear fuels and.wastes. Fur-
              thermore, the six general siting considerations established at the outset of
              .this report may.be expanded-as they apply to ports and terminals. These facili-
              ties include harbors, associated storage areas, and combination rail-harbor
<pb n="176" />

                                                                           FIGURE 11

                                                                HIGH TEMPERATURE GAS REACTOR

                       containment structure

                                      helium circulator
                            control                    steam
                            rods                       gen erator

                           q;.@f 04.

                                                          Tj
                                    XOM".
                                    Z.
                                                                                                                                                       F"

                                                                                                steam line

                                                                                                                                  turbine
                                                                N-RN. !;A.
                                                                                                                                       rator
                                                                    2N "n

                                       :V @tgi
                                                                      A
                                        -IN N
                                                                MNA

                                          Nn    05

                                                                                                                                  condenser
                                                                                               purn
                                                                                                   P
                                                                                                                                  cooling
                                                                                                                                  water

                      prestressed concrete reactor vessel

                      F

                                                                                                                [Source     222]
<pb n="177" />

                                                   162

             transshipment facilities.

                          (1) Facility'Types

                              (a) Coal

                     Development or expansion of coal handling and storage facilities depends
             directly on projected increases of coal.utilization within the Great Lakes Basin

             and changes in mode of transportation. Furthermore, increased use of low sulfur
             western coal has necessitated a change in coal traffic flow on the Great Lakes
             ,and corresponding development of new storage and handling facilities. The gen-

             @eral considerations associated with the development or expansion of these facili-
             ties are demonstrated in such specific cases as the coal transshipment facility at
             the Duluth-Superior harbor and the unloading facility at Marquette, Michigan.
                     In the case of the Duluth-Superior facility, a detailed report [3911 was
             published outlining the site selection process and the impacts associated with

             the final propsed site. Paramount in the location analysis was the need for
             multimodal transshipment capabilities (e.g., ship.and rail); rail lines capable
            .of supporting unit train.transport; and potential for adequate docking facilit
             ties for large lake freighters. Furthermore, relative proximity to coal source
             and load center was a major consideration.
                     After selection of the location at Superior, Wisconsin, attention was
             shifted to defining the impacts.of the proposed facility and designing controls
             to reduce or preclude any negative impacts. The impacts most directly associated
             with the, construction and operation of such a coal transshipment facility are the
             effects of coal,dust on ambient air and water quality. During the process of
             moving coal -from unit train, to storage pile, to conveyor belt, to ship, large
             amounts of coal dust may be generated and controls must be implemented to reduce
             the amount of dust which escapes into the air or water. Some controls include
             wetting down the coal with special suppressants, and the use of restricting bag

             chutes on the conveyor systems.
                     Other impacts are those generally associated with construction and
             operation of.a major facility. These include dredging, dredge spoil, and land
             alteration impacts on surrounding air and water quality. Also, magnitudes of
             community disruption, noise, and aesthetic impacts are considered in the assess-
             ment of the Superior facility development.
                     The coal unloading facility at Marquette, Michigan [299] is designed to
<pb n="178" />

                                                   163

           supply coal directly to the Presque Isle generating     station at Marquette. Its

           development was related directly to projected increases in coal requirements by
           the power plant and a desire to modernize the existing facility. This,moderniza-

           tion included the elimination of a short haul rail line and overall decrease in

           personnel requirements due to automation. According to the environmental impact

           statement:

                   Consideration of siting the proposed unloading facility must
                   acknowledge the presence of existing facilities in the
                   vicinity of the site. The immediate environs surrounding the
                   Presque Isle site are presently committed to industrial use.
                   Since the site west of Lake Shore Boulevard has-already been
                   dedicated to power generation, the unloading facility     'can be
                   considered a reasonable adjunct to this enterprise [299].

                   From the above two examples and others, it is possible to      summarize   the
           general resource requirements and the major impacts which are specific to this

           type of facility.

                   Of primary concern is the availability of land adjacent to existing rail
           and harbor facilities- Acreage@ requirements for coal storage and related han-
           dling equipment vary greatly depending on the configuration of the coal p      ile and
           the length of reserve time-required. Based on figures from specifications in
           project reports [391, 203, 299, 526] and communications with coal dock personnel,
           an approximate figure of 35,000-40,000 tons.per acre is reasonable for a coal
           storage land-requirement.,-assuming a 40@-50-foot pile height. This figure can
           vary greatly depending on the customer-pile relationships and the type of mech-
           anical stacking,equipment employed.
                   Major impacts of.coal handling facilities as evidenced in      the previous
           discussions include -disruption of communities during construction,     increase in'

           noise levels as a result'6f heavy equipment use, health-and cleaning problems
           associated with toil dust as a result of coal handling, water quality problems
           associated with runoff from coal piles, and removal of land from multiple use
           for storage.

                           @(b) Oil
                   Oil storage facilities are utilized at almost all the major ports on the
           Great Lakes [535]. This includes both crude oil and refined products storage
           and related transshipment facilities. Future development of storage and hAn-.
           dling capacity :Ls expected to take,place primarily in the form of expansion at
<pb n="179" />

                                                    164

              existing facilities. This, of course, is highly dependent on decisions regarding
              potential future development of major pipelines capable of bringing crude oil

              into the Great Lakes Basin from sources in the West.

                      Considerations of particular importance to the siting of new facilities

              or expansion of existing facilities which store or handle oil are primarily in
              the areas of systems requirements and environmental concerns. Presently, most
              storage facilities contain refined petroleum products and are situated at Great
              Lakes ports to facilitate ship loading, which in turn insures a wide variety of
              distribution points without the restrictions of a permanent pipeline. Crude
              oil on the other hand is routed by pipeline directly to the regining facility.
              (In 1974, crude oil represented only .2 percent of the petroleum products ship-
              ped on the Lakes [536]). A discussion of the crude oil-refinery relationship
              is contained in the following section.
                      Storage and handling facilities are located with-regard to existing and
              potential product distribution systems. Consequently, most oil storage tank
              farms are located at Great Lakes ports, particularly those ports which have re-
              fining capacity and, thus, short distance product transport capacity. From a
              systems planning standpoint, the location of storage facilities at ports and
              utilization of the extensive shipping network provides for the widest distribu-
              tion of refined products.
                      A review of some of the important environmental.considerations associated
              with the development or expansion of an oil storage and handling facility is pro-
              vided by the Lakehead Pi pe Line Company for their proposed Refined Products
              Terminal in Superior, Wisconsin (1581.
                      As might be expected, the primary concern regarding the facility is safe-
              guarding against potential spills in storage and handling. This would include
             ,tank construction, pipeline integrity, and any special precautions required for
              the loading manifold (pipeline-ship hookup). Clay dikes surrounding the oil
              storage tanks are proposed in order to insure control of potential spills in,
              the case of tank leaks. The negative effects of oil on water quality and aqua-
              tic ecology are well documented; consequently drainage controls and leak security
              are important considerations. Other considerations for oil storage facilities
              are those.associated with hydrocarbon emissions from storage tanks. Ambient
              air quality may in some cases prohibit further expansion of oil storage capacity,
              if this expansion is projected to raise hydrocarbon levels above acceptable
              standards. Emissions during vessel loading are a particular problem.
<pb n="180" />

                                                165

                           (c) Nuclear fuel

                  The scope of this study did not allow a complete investigation of the
          nuclear fuel cycle, nor of the controversial issue of nuclear waste disposal.
          However, becauseof the extent of planned nuclear-power development in the Great
          Lakes states, it is necessary to comment at least on handling and storage of the
          fuels required by these plants and the.waste generated from them.

                  Because of the comparatively small volume of fuel required by nuclear
          power plants, transshipment and storage facilities such as those associated with
          coal and oil are not a necessary component in the fuel,delivery system of nuclear
          plants. Arrangements for delivery of nuclear fuel involve truck..transport from
          the fuel processing plant directly to the power plant site [379]. Transport
          and/or storage of wastes remain uncertain at this writing but are anticipated to
          involve either truck or rail transfer from the generating plant directly to a
          disposal site or fuel reprocessing center. Consequently, without dismissing the
          safety and disposal problems associated with nuclear fuels, the role of nuclear

          fuel transshipment facilities is small or non-existent.,

                      (2)  General Considerations

                          (a) Systems requirements

                  Expansion of harbor or harbor-rail facilities necessarily depends on com-
          parable expansion or development in power production or changing emphasis in
          transporation modes. In addition to new facilities, existing developments, such
          as harbors, docks, and rails, provide areas for continued expansion. Other sys-

          tems considerations are the relative distances and related transportatio n costs

          between proposed storage or handling facilities and'ultimate usage locations.

                          (b) Safety
                  The considerations within this category apply primarily to the environ-
          mental aspects associated with the storage and handling of-fuels. These would
          include the affects of spills or leaks of rad ioactive fuels or wastes, the
          affect of coal dust and other particulate matter associated with coal storage
          and handling, and the problems with hydrocarbon emissions from oil storage tanks.

                               Engineering
                  Development or expansion of storage and/or handling-facilities entail
          many engineering considerations similar to those discussed for other energy
<pb n="181" />

                                                    166

              facilities. Most important of these are the feasibility of the land-water inter-

              face and the design of harbor breakwaters-and docks. Likewise, consideration

              must be given to,foundation stability and soil properties. Finally, pollution
              abatement and control is an important consideration when associated with the
              preceding and following sections.

                              (d) Environmental

                      Determining site locations for development or expansion of fuel storage
              and handling systems relies heavily on the potential environmental impacts of
              the facility: possible water pollution from runoff, spills, and ship activity;
              air pollution from emissions, hydrocarbon leaks, and coal dust; increase in
              ambient noise levels due to unloading operations and related industrial activity;
              aesthetic considerations such as visual impacts of coal piles, tanks, stacks,
              dust, and railways; decreases in nearby residential land values due to industrial
              development; anddisruption of terrestiral and aquatic ecology.

                              (e)  Institutional
                      Regulating and permitting procedures by state and federal agencies must
              be met in some phases of siting of storage and handling faciltie s. These would
              include filing of environmental impact reports with the proper administrative
              body, application for construction permits with agencies such as the Corps of
              Engineers or state departments of natural resources, and meeting various state
              and federal air and water quality standards. In addition, specific safety
              regulations regarding the storage and/or handling of radioactive wastes would
              be a special consideration for the placement of these particular facilities.-

                              (f) Economics
                      Costs of the above considerations are a majo r determinant of the loca-
              tion and mode of storage and handling facility to be constructed. The costs of
              land acquisition, construction, and operation will vary depending,on the type
              of facility planned and the kind of fuel to be considered, Likewise, pollution
              control and abatement costs are dependent on the materials and the areas in
              which they are handled but are major considerations in the planning phase.
<pb n="182" />

                                                    167

                    d. Refineries

                        (1) Description
                    Present petroleum refining facilities in the Great     Lakes Basin range
           from small, less than 10 mbd (I mbd = 1,000 barrels per day), to plants with
           capacities greater than 350 mbd. At the present time, there are no new refin-
           eries under construction in the Basin although several existing facilities are
           being expanded. The largest expansion identified at this time is one of 27.5
           MBD. The only new "grassroots" refinery being considered in the Basin would be
           a 200 MBD facility at Oswego, New York, although no decision      has been  made as
           yet as to whether or not it will be constructed. Further discussion of present
           and future refinery activity in the Great, Lakes Basin can, be found in Section IV.B.,
           I'En ergy Consumption and Movement in the Great Lakes Region."

                    Refineries are by nature very complex systems with many components.        As
           such, it is difficult to characterize a "typical" configuration, size and pro-
           duct mix. Generally, complexity and associated resource requirements increase
           with product mix diversity. As will be discussed below, refineries specializing
           in one or more of the four "standard" products (gasoline, jet fuel, diesel fuel,
           and  fuel oil) are relatively simple and require less area than a diversified
           refinery producing a wide range of products and petro-chemical feedstocks [2921.
           Contact with several of the refineries in the Basin has indicated that they pro-
           duce a broad spectrum of producrs with little evidence or regional specialization.
                    'Figure 12 shows some of the major components and feedstock flow patterns
           used in  modern refineries. The configuration of these components and flow rates
           will vary from refinery to refinery, depending on crude      oil supply source and
           product mix. For a more complete discussion of these components, including
           their potential environmental impacts, the reader is referred to 370.. In addi-
           tion, reference 135 provides concise descriptions of several refinery
           co n f i gurat ion s.

                        (2) Site Requirements
                    General siting considerations for refineries can be     broken into two
           groups: economic criteria and environmental criteria [292]. While both will be

             For the purpose of this discussion, no distinction has been made between bar-
           rels per calendar day (annual capacity divided by 365) and barrels per stream
           day (annual capacity divided by the days the refinery is actually in operation).
           Generally, calendar day capacity is about 95 percent of stream day capacity.
<pb n="183" />

                                                                                                                                                                                                   Fu,@l Gas               &gt;
                                                                                                       Gas                                                                     L iquified Pelroieum GCS(LPG4%
                                                                                                  Recovery
                                                                                                     Plant

                                                                                                                           lsomerizotion
                                                                            Purchased Buinne                                                   lsobutone
                                                                                                                                unit

                                                                                                                                                                                                         Aviation
                                                        Light Straight Run Gasoli                               IF)                                                                 Motor arid
                                                                                                                                                                                      Aviation           Premium
                                                                                                                    To  '7,os Recov
                                                         0                                                                                                                                               Requior
                                                        i-= 0                                                                                                                      Fuel Blending
                                                        .010             Naptha                   Catalytic              Reformate
                                                        all,
                                                     - -                 Hydro-                  Reforming
                                                        (@5 0
                                 Li:@4'   a   on        &gt;'N
           Crude Oil                                    &gt;,-          desulfjr-i2er                     Unit                                                  Alkylets
                                                                                                                               Fuel
                                                        :cx                                                                                                                                            Turbine Fue      I

                                                                                                                                                                                                                                    CN
                                                                                                                                                                                                         Kerosine
                                                                                                                                Gas
                                                         0                                                                                                                                       te          No. I
                                                          0                                                                                          Alkylotion                      Disii1la,
                                                           LO          Kercsine                  Catalytic                   Recovery                                                                    Heating Oil
                                                        000              Hydro-           --i'   Cracking                      Plcnt                     Unit                           Blending
                                                     -00 k'                                                                                                                                            IDiesel Fuel
                                                        co            desulfurize"                   Unit                                                    P G    &gt;                        No-2 Heating Oil -             &gt;
                                                                                                                                Gasoline
                                                              (s5o-noooF)                                    Catalytic Cycle Oil
                                                                                                         Ca+clytic Heavy Cycle Oil                                                             No. 5 a 6 Fuel Oil           &gt;

                                                                 Vacuum                              Residuum
                                                                                                                                                                                              Rood Oils and AsDholt
                                                               Distillation            LO              Hydro-
                               Topped Crude                         Unit              W              desulfurizer
                              (850-150oo F)

                                                                                       MAJOR COMPONENTS OF A REFINERY
                                                                                                           FIGURE 12
<pb n="184" />

                                                                       169

               discussed at greater length below, some general observations can be made at this

               time. The two most important economic criteria areavailability-of crude.oil
               and access to product markets. The most important environmental criteria con-
               sidered in the Great Lakes.Basin region relate to air and water quality regula-
               tions. Also important are,problems related to visual intrusion (aesthetics) and
               socio-economic impacts to the local area.'

                                       (a) Land requirements
                          Estimates of land required for refineries of varying sizes and complexi-
               ties are shown below in Table 15. Because major Great Lakes refineries would
               generally fall into the."diversified" class, the acreage estimates given for

               that class are the most important for this study.

                                                                 TABLE 15

                                              REFINERY LAND REQUIREMENTS (ACRES)

                                                                           C'O M P L E x I T Y
                                     CAPACITY (MBD)         SIMPLE           MAJOR PRODUCT 2             DIVERSIFIE3

                                                                6                     6
                                                             700                   800                   1860-21054
                                          100                                                             6
                                                                                                         1000
                                                            14006                1600 6                  3720-42104
                                          200                                                            18007
                                                                                                         14008
                                                                                                         20006
                                                           1750 6                2000 6                  4650-52654
                                          250                                                            10005
                                                                                                         25006
                                     1 Gasoline and fuel  oil (2921
                                     2
                                     .3 Gasoline, fuel oil, jet fuel, and  diesel fuel [292]
                                       Widd range of distillates
                                     4
                                       Reference 222  - Room for expansion  buffers. Accurate within
                                                       a factor of 2.
                                     5 Reference 505  (New Eng. Vol.II)
                                     6 Reference 292  - Includes doubling,  60'day storage
                                     7 Reference 370  -Includes doubling,,   buffers
                                     8 Reference 285  -15 days stor .age
                                                                                  8 00

                                                                                      6

                                                                                                         8

                                                                                                         0
                                                                                                         6

                                                                                                         0

                                                                                 160                     372
                                                                                      0

                                                                                                         80

                                                                                                         40

                                                                                                         2OOC

                                                                                  0006                   C
                                                                           @2                            465
                                                                                                         1OOC

                                                                                                         500
<pb n="185" />

                                                        170

                        In a report on refinery siting considerations [370], estimates for land
               required for 200 mbd account for 1.27-3.73 percent of the total facility cost
               (estimates based on 1973 dollar costs). As a result
                        ... refineries have an incentive to buy as much land as possible
                        for use as a green belt and for storage. The green belt is
                        important for aesthetic reasons and so that emissions measured
                        at the fenceline meet standards [370; p.13].

                        if it is assume4 that future refineries would allow sufficient       space to
               double production capacity as well as provide a green belt to isolate the plant
               from surrounding land uses,    flaverage" site sizes might be:

                                             100 mbd          1,500 acres
                                             200 mbd          2,200 acres
                                             250 mbd          2,-700 acres

                                 (b) Location with   respect  to population
                        When selecting a site for a refinery, there are two countervailing forces
               considered. One is the necessity     of being located close to.the finished product
               market or distribution system to reduce transportation costs. The second is to
               meet environmental criteria related to reduced air quality impacts, aesthetic
               and noise impacts, etc. As indicated above, companies are balancing these two
               criteria by locating on large sites in which it is possible to isolate the
               plant from the surrounding population. How these two forces balance in a given
               plant location decision depends on the specifics of the situation and cannot be

               generalized.

                                 (c) Water requirements
                        Water use by a refinery can be partitioned into process water used in
               producing the distillates (usually an insignificant fraction of total consump-
               tion) and cooling water. The amount of cooling water'required will depend on
               the component configuration and the extent to which air cooling is used. Typi-
               cal values are given in Table 16.
                        Reductions in water consumption for cooling are      possible  using a  higher
               level of air cooling. However, it would increase capital costs and the land
               required as well as the level of noise produced [505].        Even without a  total
               shift to air cooling, however, refinery dependence on easy water access        has
               been decreasing. This conclusion is best summarized as follows:
<pb n="186" />

                                                  171

                                               TABLE 16

                                 REFINERY COOLING WATER REQUIREMENTS

                                                         WATER REQUIRED
                                 CAPACITY  (MBD)         MGD           CFS

                                                       4131          6.2/4.6
                                                           2
                                     100               5-10          7.3-15.5

                                                       8/6 1       --12.4/9.3
                                     200

                                                       10/7.51       15.5/11.6
                                     250               4.5-5.43      7.0-8.4

                                 Estimated 1985/2000  make-up requirements [285]
                               2
                                 (292], 40-50i air cooling
                               3 [506], 40% of total flow consumed

                   Historically, siting was dependent upon water supply and waste-
                   water disposal considerations, but this dependence is weakening
                   as 4ter makeup' and discharge both decrease with increasing
                   water recycling practices [-370; p.63].

                            (d) Transportation access
                   As indicated above, the two most important economic criteria considered
           in refinery siting are crude oil supply and product distribution. In terms of
           crude-oil supply to the plant, there are two principal modes available in the
           Great Lakes Basin: tankers and pipeline. The extension of the nationwide crude
           oil pipeline system into the Great Lakes Region has made it unlikely.that future
           refineries will be dependent on tanker-supplied crude oil. This conclusion was
           reached in a study of the Great Lakes transportation system [14-7], which stated
           that, "consideration of oil and gas in relation to the Grat Lakes shipping does
           not involve to any significant degree either crude or products as cargoes to,
           from, or within the Lakes." Support for this conclusion came by contacting
           several of'the refineries in the Great Lakes Basin; most crude was received by
<pb n="187" />

                                                    172

              pipelines from either the southern U.S. or Canada.
                      The product distribution question is somewhat more complicated. Because
              product transport is more expensive than crude oil movement, this may lead to a
              situation in which refineries are located close to their potential product mar-
              kets, with crude oil supplied by pipeline or tanker. -In this way, crude oil
              source is less determinative of site location than is product market location
              [370].  This view of the site selection process can be summarized as follows:
                      Petroleum refining is rapidly becoming "market oriented" rather
                      than "raw material".oriented. This trend stems from the general
                      concession that transportation of crude to the refinery is less
                      costly than transportation of products to the market....There-
                      fore, it is very likely that new refineries4will.be located in
                      the vicinity of the large metropolitan markets such as the East
                      Coast, along the Great Lakes, the West Coast, and the Gulf Coast
                      [370; pp.53-541 (emphasis added).

              Under this view, one would expect to see major new refining capacity, either as
              new plants or large-scale expansions of existing facilities, come into being in
              the Great Lakes region in the near to mid-term future.
                      There are, however, certain constraints that modify this market-oriented

              site selection model. Some of these constraints were discussed previously: land

              and water availability in the quantities required. Others, related to long-term
              protection from natural disasters, are discussed briefly in subsequent sections.
              Constraints related to potential environmental and public-acceptance problems
              will also be discussed in the section,".Envi.ronmental and Other Congiderations."
                      Of particular importance to this study is that most of the large re-
              fineries in the Basin are connected to a regional/national product pipeline
              system (see Figure 13). For this reason, refineries do not have to be located
              in the vicinity of their potential product market. Instead, the national re-
              finery system can respond to regional demands and ship products to the points
              where they are needed. The existence of this demand-responsive system obviates
              the need for locating r'efineries in each,product market area. Indications at
              this time are that major new.refining capacity will be located outside of the
              Basin (most likely on the Gulf Coast) and the products moved through this sys-
              tem to the Great Lakes market. Thus, refineries are not expected to be a major
              concern in the future energy facility siting in the Great Lakes region.

                               (e) Seismology and geology
                      Requirements for refineries are much the same as those for coal-fired
<pb n="188" />

                                 04                                                                                        1.                Duluth

                                                                                                           FAMAn

                                                                                                                                                            cm- Ply                                 I

                                                                                                            A.? La city
                                                                                                                       si- r.11.

                                                                                                                                                7 PiT@"-'
                                                                                                    Choy"..       N,rt*.                     Do, x0i.e.
                                                                                                               6
                                        Una                                                                                    0                                 k
                                   %                                                                                                                                  %0
                                  &amp;                                  Ult [Ak. city
                                                                                                                                       cite                   v  e RiVer
                                                                                                                                                     411
                                                                                                                                                                         Mt. VeMaM

                             S,                                                                                                              T"A
                                                                                                                                                                                                   14,   VA.-It"

                                                   L.'s V.ps

                                                                                                                          C. City
                                                                                                                      okIlah." City       nio- ro@% @00 12

                                                $0. r1cl   12                                                                                                                        A
                                                                    .7m..Lx

                                                                                                                            o*
                                                                          Z.
                                                                 T           P.,I.                                          r-t v-
                                                                                                    pipalln's
                                                                                                                  11b  i1c
                                                                                                                                             o

                                                                                                                         40                                               orl
                                                                                                                                                                      go.

                                                                                                                       Am.nio

                                                                                                                         C.,pu@b choi.tl

                                                                                                                                                             [Source 493]

                                                                                                                                                                                          FIGURE 13

                                                                                                                                                            MAJOR NATIONAL                PRODUCT PIPELINE SYSTEM
<pb n="189" />

                                                     174

               generating plants--i.e., they be located in areas with suitable foundation condi-
               tions outside of areas withactive faults or other types of geologic hazards.

                                M Hydrology and meteorology
                       As is the case with the coal-fired power generating facilities, refiner-
               ies should be located outside of areas prone tolflooding and where plant opera-
               tion will not adversely affect surface and ground-water quality.

                            (3) Environmental and Other Considerations

                       There are several further criteria to be considered in the siting of new
               fuel processing facilities. The most important relative to*the Great Lakes Basin
               are those concerned with environmental quality. In particular, air pollution
               emission standards may prove to be the most.restrictive in terms of limiting
               new plant construction  (and possible expansion of existing plants).   While

               most air quality problems can be solved, reducing hydrocarbon emissions to
               the levels specified in  the national standards presents major technological
               difficulties. This problem has been highlighted   in several reports dealing with
               refinery siting [506, 285, and 370], indicating  "the need for careful attention
               to hydrocarbon emissions in refinery siting decisions" [506; pp.II-50]. How-
               ever, care must be taken to assess  refinery effluent impacts with respect to
               existing water quality conditions in the receiving stream. Also, low-flow
               conditions of the receiving waters must be considered in a refinery siting
               decision. Finally, the state water quality control agencies should be contacted
               since states have the right to impose water quality standards more stringent

               than those established at the federal level.

                        The final site selection consideration discussed here, public acceptance,
               is perhaps the most important of all. It has become increasingly obvious in:the
               past couple of years that public sentiment can be the final determinant  of where
               new refining capacity will ultimately be located. An'excellent example    of this
               is the case of the Olympic refinery (400 mbd) proposal for Durham, New Hampshire
               that was rejected by local residents in 1974 [505]. Th  US3 it is important that
               public opinions and attitudes be assessed  early in the site selection process.
               In addition, the issues causing greatest  concern, air and water quality degrada-

               tion, aesthetics, conflicting land use, etc, must be addressed directly at the

                 See discussion of EPA for details of air pollution control program, Chapter   III.
<pb n="190" />

                                               175

         outset. (Some of these impacts are discussed in a subsequent section.)

                      (4) Summary
                 The  process of selecting a site for a major new refinery is. complex-,'
         superceding  simple regional boundaries. Because the U.S. refinery system is
         tied together via an extensive crude oil supply and product shipment pipeline
         system, the  decision of where to locate a new facility is made at the national
         level, in conjunction with various regional considerations related to crude oil
         supply aind environmental quality limitations.

             4. ENVIRONMENTAL AND ECONOMIC IMPACT ANALYSIS

                 a. Introduction

                 This section presents both adiscussion of   the environmental and economic
         impacts of the energy facility types  considered in this report and a framework
         within which these impacts can be organized. Because of the specific nature of
         the data required, this framework cannot be used to perform a regionvide general

         facility analysis.  Rather, it has been included to provide the coastal zone
         management programs with a concise framework within which they can evaluate pro-
         posed energy facilities. In addition, it provides a useful summary of the major

         facility activities as well as the potentially affected environments. Finally,
        .it has been used as a guideline in development the accompanying text material.

                      (1) Framework Approach
                 For  each'facility type, there is a general discussion on potential im-

         pacts to both the natural and cultural environments. Following this, there is
         an activity impact matrix specific to each facility type. On this matrix,
         activities associated with a given facility are listed on the left-hand side and
         are cross-referenced with potentially affected environments. There is a separate
         matrix for each of the major facility types:
                 e  Fossil-Fuel (Coal Power Plants

                 e  Nuclear Power Plants

                 e  Coal Transshipment and Storage Facilities
                 0  Oil Transshipment and Storage Facilities

                 a  Refineries
<pb n="191" />

                                                     176

               The degree of impact would be indicated by a numerical entry at the intersection
               of the appropriate activity and environment. An impact scale of -3 (major nega-
               tive impact) to +3 (major benefit) is suggested. There would also be a'@special

               entry for those potential impacts that are inherently immeasurable. It is
               important to emphasize again that this system will not and cannot be used in a
               regionwide analysis. It is, instead, intended to be used by the states in
               evaluating specific facility proposals.

                           (2) Facility Activities
                       The energy facilities consideredin this study have been characterized
               in terms of activities associated with them. F8r the purposes of this report,
               an activity is defined as follows:

                       Activity--The major actions associated with the construction and opera-

               tion of major energy facilities.

               These activities have been further subdivided into one or more impact vectors,

               which are.defined as follows:
                                  Impact vectors--Those asp ects of an activity w.hich may result
               in a significant change in the existing environment. In some cases, they repre-
               sent actions, such as ground clearing and reshaping, -equipment use, channeliza-
               tion, and shoreline modification, etc. Others are the resul-t of an activity,
               such as in-flux of temporary work force, wastewater discharge, thermal effluents,
               etc. It is important to note that they are not potential impacts themselves but
               rather are elements of facility operation or construction that may cause impacts
               on certain aspects of the natural and cultural environment.
                       The following material presents definitions of all activities and impact

               vectors used in the five facility-type matrices.
                               (a) All facilities
                       Construction--That activity associated with the actual development of
               the energy facility. It is common to all facility types and is found on each

               matrix.
                               9 Ground clearing and reshaping--Those operationsinvolving a
               physical disruption of the ground surface, including stripping of Vegetation,
               grading, excavation, road building, and site restoration.
                               9 Equipment use--Those impacts directly attributable to the use
               of construction equipment, such as noise, dust, air pollution, etc.
<pb n="192" />

                                                 177

                          e Channelization, shoreline modification, and other water-

          related activities--All construction activities.associated with the water, in--
          cluding channelization of harbors for moving heavy equipment and material to
          the site, construction of breakwa.11s, jetties, and other shore protection de-

          vices, construction of docks and terminals for fuel and product transshipment,

          and the construction of water intake and outlet structures.

                          e Material movement to site--Those impacts related to the move-
          ment of construction materials to the facility site, e.g., disruption of local

          traffic patterns, deterioration of.roads, dust, and noise.
                          9 Influx of temporary work    force--The impacts of moving a large
          (1,000-3,000-person) work force into a local community during the construction
          of a major facility. These impacts may be expressed in terms of increased
          demand for housing, increased local business activity, increased local inflation,
          increased demand for public services, etc.
                          9 Public service requirements--The impact that construction of
          a major new energy facility  would have on levels of public services required in
          the local area (independent  of those above), including public safety (fire,
          police, and medical protection), water supplyand wastewater treatment facili-
          ties, government services, etc.
                          e Land committed to facility--The impact of the lost opportun-

          ities for potential uses of the land committed to the development of major
          energy facilities (several hundred to several thousand acres).
                             Other--Facility or site specific construction activities,
          specified on a case-by-case basis.

                          (b)  Nuclear power  plant operation
                  Reactor Operation--Those impacts associated with the production of power
          from a nuclear reactor facility.   This does not include those impacts generated
          by the cooling system, by fuel and waste handling, or by the transmission of
          the electric power.
                          0 Rad emissions--Those impacts generated by the emission of
          radionuclides to the air and water. While a portion of these radionuclide emis-
          sions are associated with the cooling system, they have been included here to
          provide for the more general case of overall plant operation.
                             Wastewater discharge -Those wastewater effluents not associ-
          ated with the cooling system nor containing radionuclide emissions (e.g.,
<pb n="193" />

                                                     178

              stormwater runoff, sanitary sewage, and other non-process water uses).
                                  Human service requirements--The long-term employment and
              public service requirements of operating a nuclear power plant facility.      This
              includes plant operating personnel, public safety requirements (possibly     includ-
              ing disaster training for police, fire, and   medical personnel), increased gov-

              ernment services, etc.
                               e Accidents--The potential for major disaster occurrences (e.g.,
              core meltdowns and radioactive gas emissions). Because of the potentially cata-
              strophic nature of such an event, its impacts are immeasurable. This category
              has been included primarily to emphasize that such events should be considered
              when judging a proposed nuclear facility.
                       Fuel and Waste Handling--Both an activity and an impact vector. For the

              purposes of this study   consideration of fuel and waste handling problems has

              been limited to those aspects directly related to the energy facility site; it
              is beyond the scope of the present project to consider problems related to waste
              reprocessing and ultimate disposal.- While such problems are not explicitly dis-
              cussed in this report, they must be considered as part of an overall site approv-

                 process.

                      Cooling--Those impact vectors directly related to the operation of the

              facility cooling system.
                               o Thermal effluent--Those environmental impacts related to the
              release of heated water from the cooling system into the environment.
                               o Chemical additions--The impact of the various chemicals, such

              as chlorine, added to the cooling waters to prevent fouling, scale formation, etc.

                               e Blowdown water--That fraction of the cooling water removed to
              prevent the Ibuild-up of an undesirable levels of dissolved solids in the cooling
              water system. It does not include water removed from the boiler-turbine system.
                               o Makeup water requirement--The impacts resulting from cooling
              system consumptive water use.
                               o Fog/drift -The impacts of the production of a Visible water
              vapor plume (fog) and the deposition of dissolved solid material on the ground
              surface (drift).
                               o Entrapment/impingement--The physical impact or damage that
              the cooling water intake has on aquatic organisms (primarily plankton and fish).
                               0 Visual intrusion--Those impacts associated with the physical
              presence of a major structure as they relate to the surrounding environment.
<pb n="194" />

                                                179

                  Transmission--Those impacts related to the transmission of electrical
          energy via EHV and UHV transmission lines. Also included are those impacts of
          maintaining these large bulk transmission systems.
                          0 Visual intrusion--(See previous  definition.)
                          e Disruption of human activities--Those impacts related to a
          limitation on the use of land or the movement of people across it. Examples  are
          the fractionation of property by rights-of-way, and the limitation of the use

          of lands within a right-of-way.
                          e Natural system disruption--Those impacts affecting the ecology
          of an area. They may be reflected in changes in the species diversity of the
          plant and/or animal communities in and around the area of interest.
                             Electric field ef@ects--Potential impacts of high energy
          electric fields, especially those associated with UHV (765 KV and larger) trans-
          mission lines. Examples of these potential impacts include-radio noise (RN),
          television interference (TVI), audible noise (AN), induced voltages, and pro-

          duction of ozone near the lines.

                          (c) Fossil fuel (coal-fired) power plant operation
                  Fuel Transshipment and Storage--The receiving, movement over short dis-
          tances, and storage of coal at fossil fuel power plants.
                          * Noise-- The impacts of noise generated for a given activity.
                          * Particulates--- The impacts of fine.solid materials given off
          to the atmosphere during fuel processing and storage or combustion.
                          e Leachates and runoff--The impact of material leaching and
          washing off of stored coal and surface wash from plant site in general.
                          * Visual instrusion--(See previous definition.)
                          o Human activity disruption--(See previous definition.)
                          * Equipment use--Impacts associated with the use of fuel-hand-

          ling equipment.
                  Plant Operation--That activity directly related to the operation of a
          fossil fuel power plant to produce electricity.
                          e  Wastewater discharge -(See previous definition.)
                          o  Particulates--.(See previous d&amp;finition.)

                          0  SOx emissions--The impacts of sulfur emissions from plant

          operation and fuel processing.
<pb n="195" />

                                                      180

                                  NOx emissions--The.impacts of nitrogen oxide emissions from
               fuel processing or combustion.
                               @ Human service requirements--(See previous definition.)
                               0 Accidents--(See previous definition.)
                        @lin@--(See previous activity and impact vector definitions.)
                       Waste Handling and Storage--An activity associated with the disposal and
               storage of waste from fuel combustion or processing. This may include fly-ash
               and spent sulfur dioxide control materials (limestone, dolomite, etc.). Impact
               vectors included under this activity have been satisfactorily defined previously.

                                  Leachates and runoff--

                                  Particulates---
                               e  Visual intrusion--                  (See-previous definitions.)

                               e  Human activity disruption -
                               e  Natural system  disruption -
                       Transmission--(See previous activity and impact vector definitions.)

                               (d) Fuel transshipment and storage facilities

                       General--Activities common to both coal and oil transshipment facilities.

                                  Harbor maintenance--The impact of additional harbor mainten-
               ance required to service fuel transshipment and storage facilities, including
               such operations as dredging, dredge spoils disposal, breakwater construction, etc.
                               0  Waterborne material movement--The impacts of additional harbor
               traffic related to the development of a fuel transshipment and storage facility.
               It only deals with impacts in the harbor area, not on the lakes in general.

                               9  Overland material movement--Impacts of material movement in
               the vicinity of the facility. It does not include impacts of the movement of

               material from the point of extraction to the facility.
                       Coal Facilities--Those impact vectors specific to coal transshipment.and
               storage facilities. All impact vectors included under this activity have been
               defined previously.
                               0  Human service requirements--

                               o  Particulates---

                               e  Leachates and runoff--
                                                                      (See previous definitions.)
                               *  Visual intrusion--

                               *  Human activity disruption--

                               e  Equipment use--
<pb n="196" />

                                                181

                  Oil Facilities--Those impact vectors specific to oil transshipment and
          storage facilities..

                          9 Hydrocarbon emissions--Those impacts associated with the dis-
          persion of hydrocarbon vapors into-the-atmosphere.
                             Leaks and spills--Those impacts that occur through the re-

          lease of small-amounts of oil into the environment.
                          *  Visual intrusion--(See previous definition.)
                          9  Human activity disruption--(See previous definition.)
                          *  Accidents--(See previous definition.)

                          (e) Refineries
                  Crude.Oil Receiving and Storage--Those impact vectors related to the
          movement of crude oil from its arrival point (e.g., pipeline, tanker terminal,
          or rail terminal) to the refinery complex and its storage onsite. All impact
          vectors included in this activity have been defined previously.

                          *  Hydrocarbon emissions--

                          e  Leaks and spills--
                          *  Visual intrusion--                (See previous definitions.)
                          9  Human activity disruption--

                          *  Accidents--

                  Plant Operation--Those impact vectors related to fuel processing at a
          refinery. (The following have been previously defined.)

                          e  SOX emissions--
                          *  NOx emissions--

                          9  Particulates---
                          *  Hydrocarbon emissions--
                          *  Other emissions--Impacts associated with the emission of
          other refinery residuals to the atmosphere, including aldehydes, carbon monoxide,.

          and ammonia.

                          * Leaks and spills--(See previous definition.)
                          * Solid wastes--Impacts stemming from handling and disposal of
          refinery waste materials,. such as sludges and biological solids.

                          9 Cooling water consumption--(See Makeup Water Requirement.)
                          e Process Water Consumption--Water consumed in processing crude
          oil and feedstocks independent of the cooling system requirements.
<pb n="197" />

                                                    182

                              9 Wastewater effluents--(See previous definition.)
                                 Visual intrusion--(See previous definition.)
                                 Accidents--(See@previous definition.)
                      Product Storage and Shipping--The  activity with the impact.vectors re-
              lated to the storage of refinery products  and their transfer into a shipment
              system (truck, train, pipe, or ship). All associated impact vectors have been
              defined previously.
                                 Hydrocarbon emissions--
                                 Leaks anq_@@ @ills-
                                 Visual intrusion--                 (See previous definitions.)
                              e  Human activity disruption

                              e  Accidents--

                          (3) Impacted Environments
                      The environments potentially impacted by the activities associated with
              the construction and operation of energy facilities may be.conveniently divided
              into two major categories: natural and cultural. The natural environment in
              this analysis refers to the existing physical, chemical, and biological charac-
              teristics of a site or area which may be altered by a proposed activity. The
              cultural environment may be distinguished from  the natural by emphasizing the
              attributes, uses, and alterations of the environment associated with human

              development. These may be divided into   the social, economic, and physical
              aspects of the human,environment.

                              (a) Natural

                                   (i) Physical and chemical characteristics
                      Dividing the environment into its three major,components, terrestrial,
              hydrological, and atmospheric, it is possible to describe the existing conditions
              and suggest how those conditions may be affected by a proposed activity. Under
              terrestrial are included the existing soil characteristics defined in terms of
              quantity and composition and landforms which define the natural topography.
                      The hydrological category includes both the quantity and quality aspects
              of the surface and ground-water systems. It is necessary to define the existing
              characteristics of water supply and water quality in order to determine the
              potential impact of,a proposed activity, such as the development of a cooling
<pb n="198" />

                                                 183

           system and the associated additional demand for water. Changes in water quality
           that result from this activity are potentially important impacts and should be
           accounted for in an impact analysis., Examples of such physical and ch emical
           quality,changes would include alterations in temperature due to thermal dis-
           charges from cooling systems.and increases in chloride content as a result of

           chemical treatment.

                   The atmospheric category includes the local meteorology of a proposed
           site and the ambient air quality associated with the area. Because of the
           importance of the meteorology to local circulation patterns and affected land
          -uses (e.g., agricultural), any potential impacts from energy facility activities
           should be outlined prior to implementation. Likewise, any alterations in air
           quality, beneficial or detrimental, which may result from a proposed activity
           should be noted in an environmental impact assessment. An example of this would
           be the increase in hydrocarbon levels associated with the einplacement of a new

           oil refinery.

                               (ii) Biological conditions
                   The natural,biologic,al conditions can be divided into the terrestrial
           and aquatic ecology of a given area.
                ...The.terrestrial ecology can be categorized in terms of the vegetation
           and the wildlife which characterize an area or site for a proposed energy.facil-
           ity. Because of the complex interrelationships within these categories, it is
           important to outline any potential alterations or disruptions in the vegetation

           and wildlife communities as a result of.activities associated with the construc-

           tion and operation phases of a proposed facility.
                   Likewise, impacts on aquatic life, such as disruption of benthic com-
           munities due to dredging, entrainment, and impingement of nektonic communities
           by water intake systems, and alteration of planktonic life due to thermal changes,
           are all potentially significant and should be addressed in an overall assessment.

                           (b) Cultural

                   The cultural environment refers to the attributes, uses, and alterations
           of the natural environment associated with human development. These  can be cate-
           gorized into social, economic, and physical headings.
<pb n="199" />

                                                     184

                                   M    Social

                       Included in the social division of the cultural environment are the un-

               quantifiable aspects associated with aesthetics and human interest and the poten-
               tially sensitive areas of public health.
                       Aesthetics and human interest refer to the prevalent values assigned to
               natural features such as scenic views and vistas, wilderness qualities, land-
               scape design, unique physical features (e.g., sand dunes), parks and reserves,
               rare and unique species and ecosystems, and historical or archeological sites.
               It is possible that activities associated with the development of energy facili-

               ties may create, enhance, alter, reduce, o r destroy those features to which

               value or interest is attached in a particular area and this impact should be

               noted.

                       Factors related to public health which  may be affected by a specified
               activity include ambient noise levels, quality  and quantity of drinking water,
               air quality, and safe ty. In this case, safety  refers to the degree to which
               public well-being may be affected in the.event  of a major accident such as
               radiation leaks, fires, or terrorist attack on  the facility.

                                   (ii) Economic

                       Included in the economic section are those areas of the cultural environ-

               ment related to the framework within which the human community functions: employ-
               ment, housing, infrastructure, land value, and local economy.
                       Impacts on employment can be divided  into short-term effects related to
               the construction of a facility and any long-term effects due to increases or
               decreases in the maintenance and operation staff. Other possible impacts on

               employment are the indirect or multiplier effects associated with the increased
               demand on related goods and services, and the decrease in employment associated
               with new automated technologies.
                       Housing supply and demand in an area are directly affected by the influx

               or workers associated with a construction project on the short term and permanent

               staff on the long term. In order to meet housing requirements, this impact must.
               be assessed during the planningstages.
                       Infrastructure refers to the existing transportation network, waste dis-
               posal systems, utilities, and public services that are required for support of a
               population in a given area. Changes in these requirements as a result of the
              .development of an energy facility should be planned for and are thus included in
<pb n="200" />

                                                185

          the impact assessment. Safety services in this section refer to police, medi-
          cal, and fire services.
                  Land values may change as a result of energy facility development and
          related activities. These land values are divided into residential, agricul-
          tural, commercial, and industrial categories and are considered with regard to
          their proximity to the proposed facility. In other words, it is possible that
          residential land values adjacent to a proposed refinery would decrease for its
          present use, whereas, the value of residential land somewhat removed from the
          facility would increase due to added demand from added employees.
                  Finally, the local economy of an are a may be affected by a proposed
          energy facility in terms of changes in governmental budgetary or fiscal effects,
          and positive or negative impacts on local business activity.

                              (iii) Physical
                  Physical aspects of the cultural environment include the existing and
          potential land and water uses assigned by humans to the natural environment.

          Also included are the recreational values of the natural environment.

                  Land and water uses have been divided into wilderness-and open space,
          wetlands, forests, grazing, agriculture, residential, commercial, industrial, and
          designated lands -(i.e.,,state and federal-lands). Impacts of energy facility
          development differ greatly depending on the existing land use-of the area under
          consideration. This is exemplified in.the decision of whether to develop on
          agricultural land, precluding further agricultural use of that land, or to
          develop-on land already used by industry. The impacts on land use and potential
          alterations in-land use are extremely important in an overall assessment of en-
          vironmental impact.
                  Recreational value assigned to a natural area increases or decreases as
          a result of an energy facility development. Such a change in value should be
          recognized at the outset. Recreational categories include hunting, fishing,
          boating, swimming, and camping..

                      (4) Application.
                  The material that follows provides a-general survey of the types of
          natural and cultural impacts that may accompany the construction and operation
          of a major new energy facility. Because it deals with general energy facility
          types rather than with specifically proposed proj,ects, it cannot reach the level
<pb n="201" />

                                                      186

                of detail necessary in actual project evaluation.. It wi 11, however, focus atten-
                tion on certain aspects of each ;acility type that should be addressed in such an

                evaluation.

                        The matrices accompanying each discussion are@intended to be used as
                guides in developing a facility siting evaluation process. As such,   they can

                be used in several ways. The activities and environments listed on the matrices
                could be used as guidelines in developing the elements of such a process. In
                addition, the matrices themselves could be used as a part of the evaluation pro-
                cess. This could be done in one, or both, of two ways. They could be used by
                the state site review agency.or agencies in evaluating specific energy facility
                siting proposals. Alternatively, they could be used by utilities and companies
                in developing reports on the environmental and economic impacts of their pro-
                posed projects. Ideally, the stateagencies and the companies would use the
                same framework to facilitate a more comprehensive and free-flowing procedure.
                        Before the analysis of major facility operation.impacts, there is a
                general discussion of construction activity impacts common to all.

                        b. Ene y-Kacility Construction
                        Because most construction activities are common to all of.the facilities

                considered here, discussion of their impacts has been grouped into this one sec-
                tion. Where differences do exist, e.g., in period of construction, size of
                labor force employed, and,overall project scale, they will be highlighted and
                discussed separately. In general, power generating facilities of both types
                require the longer time (7-10 years) and a larger labor force (peak of more than

                2,000 persons) for construction than transshipment facilities, which require the
                les s than 2 years and 100-200 persons. The discussion will first address
                impacts to the natural environment and then examine cultural impacts.

                            (1) Natural Environment
                        Construction activities represent a major disruption of the local environ-
                ment that can result in significant changes in the surrounding air and water
                quality. While details as to what those impacts would be and how extensively
                they would change the existing environment will vary from site to.site, a certain
                amount of generalization is possible. In a report published by the EPA [5991,
                three classes of construction-related pollutants were identified: sediment,
                chemical, and biological. Of these, very little is known in a quantitative way
<pb n="202" />

                                                187

          concerning chemical and biological pollutants. The! principal biological pol-

          lutants are associated with poor sanitary conditions at the site as well as soil
          organisms released through the physical disturbance of the earth. The major
          chemical pollutants associated with construction activities are petroleum pro-
          ducts (the largest group), pesticides, fertilizers, synthetic organic materials,
          heavy metals, additives used to maintain, desirable, soil characteristics (includ-
          ing lime, fly ash, asphalt, phosphoric acid, salt, and calcium chloride), and
          construction chemicals (glues, solvents, sealants,.etc.)
                  Several studies have looked at the effect of construction activities on

          erosion rates and sediment loads. One study in the Washington D.C. area found
          that, while lands under natural conditions contributed sediment at a rate of
          less than 70 metric tons/km2 /yr, land under development contributed 354 to
                               2
          42,350 metric tons/km /yr [cited in 599]. Other studies have demonstrated simi-
          lar results: a study in northern Virginia showed that constiuction activities
          representing only 6 percent (72.5 ha) of the surface area of a watershed con
          tributed 94 percent of the 33,500 metric tons of sediment transported from the
          basin during a 3-4 year period of record [cited in 599].
                  .In a report prepared for the Atomic Industrial Forum [173], four phase s
          in the:facility construction process were identified:
                  e Preconstruction--@-Those activities which closely follow site selection--,
          including site inventory, environmental monitoring, and implementation of tem@-
          porary impact controls.
                  a Site Work--Site clearing and construction of temporary buildings,-
          access routes (roads, railroad spurs, and channels and docks) and associated

          facilities.

                  e Permanent Facilities--Activities associated with   construction of

          facility components.
                  * Project Closeout--Removal of temporary buildings and final landscaping.

          The principal pollutants and potenti al impacts associated with each are listed
                         r
          in Table 17 [from 2031.

                  The distribution and magnitude of these impacts varies.with the type of
          facility being constructed. For example, impacts on the aquatic ecosystem, par-
          ticularly the benthos, might be greater in the development of a new fuel trans-
          shipment.facility for which major harbor and channel modification may be neces-
          sary. In similar fashion, water quality impacts stermiing from erosionof
<pb n="203" />

 0

                                                                                                                                          188

                                 TABLE 17                     POTENTIAL ENVIRONMENTAL IMPACTS RESULTING FROM CONSTRUCTION PRACTICES

                                    @ ' @ a s, r u c t : o n   ? @ @ S e              C o n s !r - _ ,cti o n Practice                           r i n a .        I l u @ a 2 L s                                        P ot-t ial Environmental  I r o i ct @
                                                                     a.                            Site  i n-to r y                                                 Sh o rt-t e r n an , 1 - m in al
                                                                                                   (1 )  V e @ t icul @ traffic Dust.  n n i % c ,  se 4 i r e nt                 Dust, s ed i r- it, and tree injury
                                                                                                   (2) Test pits                                                T- -.t  I n j ery, sediment
                                                                      b .                            Env,  r c-ntal  n onit- visual                                                     if properly  e @r i e
                                                                                                   -ring
                                                                                                   T c q_ _  r . ' - Y                                                   Shc r t-t e r .   a n d
                                                                                                    0)  S - o r-z e r                                                  Ve Z et ation, water, qu ,    lity
                                                                                                   (2)  Er es i ..  F .  s ed i-  S e d i m rt t 'Poll, nutrients,             Vg ...  t i . n . 'at-  q a l l t y
                                                                                                         ..lid waste
                                                                                                   (3)  q@ q@et tat i v e                                               Fertilizers in excess
                                                                                                    j4 )  t 1ust                                                    Negligible if properly done

                                    7.    S @ t e  ' n . ; '                                                 Cl c - - r g  n e  d e m.-                                             Short term
                                                                                                    l iti. n
                                                                                                   (1) C i earin g                                                 Decrease in the area of protective tree, shrub, and ground
                                                                                                         Dust, sediment, noise, $.lid  a lt-.                     covers. stripping of topsoil;  l r r re a s c @ soil erosion,  s ed l i m en-
                                                                                                         wood  a 5t e s                                             tat i on,  and  st or m- t er runoff-, increased s ir- w it e- , tempera-
                                                                                                                                                                t. r.s;  m ed l       fi c at i o @ of stream banks and channels, water  qu zlit y
                                                                                                   (2) Demolition                                               Increased         dust, n o1a, solid wastes
                                                                     b.                            T e . , p.- r y facilities                                         Long-term
                                                                                                    ( 1 ) shop.  &amp;  t ...  g e                                         I cr -d             s -Face - 3 i -p e r v i... t o water  -filtration.
                                                                                                                                                                n
                                                                                                   I"I  J s Gases, o d c @ , f e r i e s, particulates,                     I  c r q: a s e d         water runoff, petroleum products
                                                                                                   ( 2) c ' ma ds  &amp;dust, deicing ch e . @ Ical s, noise                   Increased         surface areas i r r pemio us to w a t- r infiltration,
                                                                                                   par q! kin a lots p etr ol- products, waste waz er,                 increased         water runoff, generation of dust on unpaved  ar , e a s
                                                                                                   (3) Utility tr nch es solid wastes, aerosols, pesticides      Increased         visual Impacts, soil erosion. a n d  s edi-t at i on for
                                                                                                    &amp; b ack f , I I:                                                  short periods
                                                                                                   (4) S a sitary fac il l-                                         Increased visual impacts, solid wastes
                                                                                                   ties
                                                                                                   (5)  re n z e s                                                   Barriers to animal migration
                                                                                                   (6) L.y d . v s areas                                            Visual  i @ act s . increased ru s off
                                                                                                   (7) Concrete batch  S edi-nt, dust                             Increased visual impacts; disposal of wastewater , Increased
                                                                                                   plant                                                        dust and noise
                                                                                                    ( 3 )   Z c c ? o q- y  a n d                                             N o n-de gra iabl e or slowly degradable pesticides  a r e a c c u s, ul at ed
                                                                                                   pe-a n-t pest                                                 by plants and animals, then passed up the food  cha i n .t o  m on.
                                                                                                    c ? n tr ol.  (t ,r                                                Degradable pesticides having short biological half-lives a r e
                                                                                                    . 1 te s .  v e e d . .                                               prefer r,ed for use
                                                                                                   insect-%)

                                                                                                   Earth  pus i, noise, sediment, debris,                         Long-term
                                                                                                   1) E . a-t i o n wood wastes, ..lid waste., p. sti-               Stripping, soil stockpiling, and site grading; increased  er os-
                                                                                                   (2)Grad  n g  c i de s, particulates, bituminous                   ion, sedimentation, and runoff, soil compaction; Increased In
                                                                                                   3) Tr - eh * , . , , pm d ucts, soil conditioner c hemi-               soil level- of potentially hazardous materials; side effects an
                                                                                                   4)  S @ 1 1 treat ...  t c a l s                                      living plants and animals, and the  I nc orpo r a l on  o f dec on p o s i-
                                                                                                                                                                ti o n products into food chains, water quality
                                                                      d.                            Site  d r a ina i e                                                Long-term
                                                                                                   ( 1)  F- @ . t  i o n                                                Decrease in th e volume of underground water  f o ,- short and long
                                                                                                    era ' .' n a &amp; e                                                   time periods,  i s cr ea sed stream flow  vol u i e s and  v elo c @ it l cs,
                                                                                                   (2)
                                                                                                    - e-t eri ng Sediment                                           downstream damages, water quality
                                                                                                   (3) , - . @ 1 1 points
                                                                                                   ( 4)  St- c ' c n a n n el
                                                                                                   r e @ l oc at i o , q
                                                                      r.                            L .  n e.  3- g i n ;
                                                                                                   - @ p o r- y                                                      Decreased soil erosion and overland flow of  5 t or-  at er.
                                                                                                    q!e e d i n g Nutrients ,  pet i c i d -                                  stabilization o f exposed cut and fill slop-  , increased water
                                                                                                   (2)  e r- e nt                                                   infiltration and underground storage of  t a - e r ,  mi n i m , * ? e visual
                                                                                                    a n d                                                          impacts
                                                                                                    . . J d i n g

                                   3.                 F a, - ' I ; @                                      I L- s  t                                                       L o r Z-term
                                                                                                   heavy tr . ff ic a-  S ed l e- e n-, dust,  roise,
                                                                                                   larking lots p ar t icu l 't e s                                    Sto- ,_ water runoff, p etr o le= products
                                                                                                    S ' i t c h y ' r d                                                   Visual impacts, sediment, runoff
                                                                                                    D) - . ; l r- d spur  l i-                                           Sto rmw a t- runoff
                                                                      b.                            Bull  @  i  n g @                                                 Long- t em
                                                                                                   (I) W .r eh ou ses                                                1 , p e r l , i... surfaces,  st or r @at er runoff, solid wastes, spillages
                                                                                                   (2)  S .- i t- 7 Solid  . 2 s t e s                                     Odors. discharges, bacteria, viruses
                                                                                                   tr t c a nt
                                                                                                   (3) C oolir , , t . - w- s                                           V i .. I  i ' p . c t @
                                                                     c.                            Related facilities                                           L o @ &amp;-t-
                                                                                                    ( 1) Re  a c,  i nt A c k e S                                          Shoreline changes, bottom topography ch a i g es, fish  m i gr, i t i o n ,
                                                                                                    e i -h- g e                                                       b " ' t h i c  f . u r a changes
                                                                                                   ( 2)  i 1a t e r -p p ly  f .                                          Waste discharges, water quality
                                                                                                   t ' e -t -  t
                                                                                                   (3)  S t c q-at . r dr. : n -                                          Sediment, water  q- I itY
                                                                                                         Sediment, trace e l er l e nt s , noise.
                                                                                                    V i st- a - er tr-t-  cau st , c chemical wastes,  s e di r e at            Sediment, water quality, trace  el- e nts
                                                                                                    cen ' , spoil,  f l o c c u l l st s , Particulates,
                                                                                                    P , , ,
                                                                                                   (5) - . 1 .  i @ . T o- ' ! - fur ... .lid wastes                       Dredging, shoreline erosion
                                                                                                   cents
                                                                                                    ( 6)                                                          Circulation p att em s in t he w a z e r wa y
                                                                                                    j e tt i . . '
                                                                                                   (7) Fuel han , @ I iZ                                            Spill. Z e. , fire,  a nd visual impact.
                                                                                                    q
                                                                                                   ( S)  0 :1  't ...  @ e  t - k "                                       Visual impact.
                                                                                                    "o  n t ' . I s '  &amp;  p i ; i , ! g
                                                                                                    ( 9 ) Conveying  sys t-                                          Visual impacts
                                                                                                   ( qcr qane qi q,  qfo q@ qs q@ qs.
                                                                                                   chutes)

                                                                                                    q( q1 q0 q) Waste  qh q. q' qd ql qi qr qg                                          Noise,, a qn qd Visual i qm qj q@- qtS

                                                                                                   e- q-. q, q..  qw qr qo q@
                                                                                                   c qn qi qp qp- q, t-h

                                                                      qd.                             qS qe qc q- qi qt qy  qf qe- qi qn qg                                               L qo qn qg-t qe 4q-
                                                                                                   (1)  qk- qe- road S qe qd qi-t q@ q, wood  qw-t q@ qs                             qJ-r qv qa qs qed runoff
                                                                                                   (2)  qT qe qnr qi qn qg                                                  Barrie q- t qo animal  qm qo qv- qt q,

                                          qP qT q' qJ qecz C ql- qe- qt                                             qo qf t q' q@ qP-- qY                                                    qSh q. qr qt q- qt qe ql-
                                                                                                   offices  q&amp;  qs qh qc qp q@
                                                                                                   ( q1)   Noise. dust, solid - qst qe qs                                qN qo qi qs q' qs q. solid waste, dust
                                                                                                   (2)                                                          St qo- qat-, r qe qso qff, traffic blockages, soil c qo qr q; q@a qc qt qi qo qn
                                                                      qb.                            Site r qe  qst.-t qi qon                                             Short-term
                                                                                                   ( q1) qF qi qn qi qs qh  qg qr qa q3 qi qn qg                                            Sediment, dust . q, q' qI
                                                                                                    q( q2 q)  qT qo qp qs qo qi ql qi qn qg.  qS q' qd qi qn qe q. qt  q,  qd q" q' qt                              Erosion,  qs qc qdi q, , q, q. q- qnt
                                                                                                   (3)                                                           qVutr qi qent runoff, wat- quality
                                                                                                    q0)  qS q@d qi qr qe qn q-  q- qn qt- ql qs                                            qV qe qg qe qt qa qt qi q. qh
                                                                      qt q.                            Preliminary  qs qt qa qr qt q- qe q?                                          qS qhrt-t-
                                                                                                    q( q1 q)  qc ql qe- qi qn qg  qNu qc qt qi qen qt qr, petroleum products                    water quality, .!Is, phosphate          and  qct qb qtr nutrients
                                                                                                   ( q2) Flash q.
                                                                                                    q. qr qg
                                                                                                                                                                                                         203 2q1
<pb n="204" />

                                                   189

           excavated and cleared soil might be greatest for a nuclear facility construction
           site because of the longer construction periods involved. The impacts associated
           with a given construction activity must be evaluated in light of thespecific
           conditions of the site under consideration and the actions proposed by the
           developer. A list of factors having a bearing on these impacts include:
                       Resistance of the surface and subsurface soils to erosion by gravity,
           water, and wind

                    0 Chemical and physical properties of the soils and parent materials
                       Topography and size of the jobsite
                       Distribution and frequency of rainfall
                       Care used in trapping sediment and collecting liquid wastes
                    e Area and time duration of exposure of cleared and excavated portions
           of-the jobsite
                    s Number of people and machines linked with each jobsite at successive
           stages of the construction effort [173; p.41.

                        (2) Cultural'Environment
                    The impacts of construction on the cultural environment in the -vicinity
           of a  proposed energy.facility can be severe as evidenced in the Alaskan Pipe@
           line  experience. While it is unlikely that impacts of such magnitude would be
           ,experienced in the Great Lakes Region, certain elements of development-induced
           cultural system change must-be considered.
                    Tables 18 through 21 present employment profiles for each of the facility
           types considered. The different facility types show considerable variation in
           terms of construction time, peak construction employment, and operating employ-
           ment requirements. Because of its small construction manpower requirements, it
           is not likely that the development of a new fuel transshipment facility would
           cause any significant cultural system impacts. On the other hand, the large
           work forces and relatively long construction periods with.high levels of.employ-
           ment for power plants and refineries create the,potential for some local social
           impact. The magnitude of this impact depends on existing socioeconomic condi-
           tions and.must be evaluted on a case-by-case basis.
                    Cultural impacts during the.construction and pre-operational stages of
           major facilties development arise from three major sources: influx of a large
           construction work force, the movement of construction materials through the
<pb n="205" />

                                                                                              190

                                                                                    TABLE 18

                                                       WORK FORCE PROF11LE: NUCLEAR                         POWER PLANTS

                                                     P R 0 P 0 S E D       P -0 W E R    P L A N 7     1 N F 0 R M A T 1 0 N                             HYPOTHETICAL
                                                                                                                                                           AVERAGE
                                        812 lefonte                  McGuire                     River Bend                   Susquehanna
                                        (24 30HWe)                   (2360MWe)                   (1870HWe)                    (21OOMWe)                    (220OMWe)
                        Year   ConstructionjOperation- Construction Operation Construction Operation Cons                  truction Operation Construction Operation

                            1.       850               0          850                         100                0         300                0         418              0

                            2        1500              0         1537               0         350                0       '1800                0       1232               0

                            3        2150              0         1810               0        1200                0       2300                 0       1980               0

                            4        2240             30         1634               0        2100                0       2500                 0       2200               0

                            5        1660           155           950              30        2000                0       2400                 0       1914               0

                            6        630            170           200            170         1650                0       1500                 0       1254              35

                            7           0           170              0           200         1000              30          800                0         396             105

                            8           0           170              0           200          300               70         250              20             0            140

                            9           0           170              0           200             0           100           100,             60             0            140

                            10+         0           170              0           200             0           100              0             77             0            140

                                 (390]

                                                                                    TABLE 19

                                              WORK FORCE PROFILE:                   FOSSIL FUEL (COAL) POWER PLANTS

                                                 P R 0 P 0 S E D          P 0 W E R.      P L A N T        I N F 0 R M A T 1 0 N                  BECHTEL    3
                                           Colstrip 3 &amp; 4                  Tombigbee 2 &amp; 3            Pleasant Prairie 1 &amp; 2         2'          ESTIMATES
                                               (70OMWe)                          (420MWe)                        (1234MWe)                        (80OMWe)
                       Year          Construction Operation Construction Operation Construction Operation                                 Construction Operation

                                           270                0            180                0              48                0                  40                0
                            2              1418               0            972                0             155                0                420                 0

                            3              1418               0            972                0             566                0                864                 0

                            4              270             173             180               112           1131                0                814                 0

                            5                 0            693                0              450            578                0                360             109

                            6                 0            693                0              450            845                0                  0             109

                            7                 0            693                0              450             81               120                 0             109

                            8+                0            693                0              450                0             120                 0             109

                             [3901
                            2[573), Unit 1 completed in year 5, Unit 2 in year 7.
                            3[5411, probable error less than 25%.
<pb n="206" />

                                                        191

                                                 TABLE   20

                                    WORK FORCE PROFILE: REFINERIES

                                                                                                 3
                                          .250 MBD                                       200 MBD
                          Low Fuel Oil                High Fuel Oil                    Low Fuel Oil
                                              2                 1            2
           Year. Construction Operation           Construction Operation         Construction Operation

                       2180               0           1800              0              521            0

              2        2180               0           1800              0             2536            0

              3        2180               0           1800              0             3272            0

              4           0             435               0            410            1257            0

              5+          0             435               0            410               0           551

          1  [5061
          2 [505]

          3
            [541], probable error generally less than 25%.

                                                TABLE 21

                          WORK FORCE PROFILE: FUEL TRANSSHIPMENT FACILITIES

                                                  C 0 A L                                 0 1 L

                                                                              2                          3
                               Superior, Wisconsin      Marquette, Michigan        Superior,, Wisconsin
                                (8 million tons/yr) (12     million tons/yr) (6.2 million.barrels/yr)

        Construction   Period
          (months)                       20                        12                       12

        @Construction
          Employment                    100                                              150    2010
     -@Operating
                                                                    4
          Employment                     50                         2                      8    12

              [3911
          .2  [2991
          3   [158]
          4   Based on operator time requirements.
<pb n="207" />

                                                    192

              local area, and the presence of the facility itself.    Of these, the potential
              for the greatest cultural system damage is associated with the first, while the
              greatest potential benefits stem from the third. Ofcourse, the magnitudes of
              ,the costs and benefits associated with each will vary from case to case.

                              (a) Influx of work force

                      For a construction project of the magnitude considered here, there will
              be 1,000-3,000 workers employed at the site for periods of up to five years. It
              is doubtful that a mix of the skilled tradesmen in the quantities required could
              be found locally unless the site were near a major metropolitan area. In other
              cases, a large fraction of the work.force would have to come in from outside of
              the local area and either commute (daily or for the week days, leaving on week-
              ends) or move into the local area for the duration of the project. Construction
              workers generally are. willing to commute long distances to job sites, with
              50-100 miles each way not uncommon [4511. Figure 14 shows those areas within 75
              miles of major metropolitan areas (SMSAs with 1970 populations of 500,000 per-
              sons or more) in.the Basin where daily commuting may be possible for a large

              portion of the work force. . While it may not present a complete picture of
              "local work force availability," Figure 14 does at least indicate that the south-
              ern, more heavily developed portion of the Basin may generally be less suscepti-
              ble to the types of impacts associated with heavy in-migrations of construction

              workers.

                      The reader is cautioned about drawing  conclusions from Figure 14 and the
              brief dicussion of it that go beyond the material presented.    In reality, the
              problem of a commuting versus transient resident'work force is  much more complex,
              depending,on many factors, some site-dependent, others supralocal. One factor
              that must be considered is the attractiveness of the site community in terms of
              inducing workers.to move from their present locations to the local area. For
              example, if the workers were being drawn primarily.from large metropolitan
              areas of great cultural diversity (shopping, entertainment, recreation, schools,
              etc.) that a rural job site could not offer, then it might be that those that
              could commute would do so. If however, the site were in an area similar to those

              7@-
                For the purpose of this discussion, the physical presence of the facility it-
              self, regardless of its operational status, will be considered under construction
              impacts. Impact's and residuals stemming directly from-the operation of the plant
              are discussed in later sections.
<pb n="208" />

                                                 Cq"
                                                                                    0

                             MINNESOTA                      c

                                                                                  LAKE         SUPERIOR

                                          th                                                                                                                                                                                                  STA
                                        z     supeno,                                                                                                                  ONTARIO
                                                                                                                                                                                                                                   20          X,

                                                                                                                                                      St. Aldrys Rit-
                                                                                                 MICHIqAN----

                                                                                       Wis.

                                                                                                                                                                                             GFORGIAN
                                                                                                                                              R." I                                             11A Y

                                                                                                                          J
                                                                          WISCON         N                                                                           LAKE     HURON
                                                                                                                                                  A. S&amp;.&amp;&amp;
                                                                                                   Cleo                       ".."w
                                                                                                   Bay

                                                                                                                                                                                                                                         ONTA
                                                                                                                                                                                                                              LAKE       qt@t4AR&amp;
                                                                                                                                                                                                                                        'TED ST

                                              t3l

                                                                                                                                                                               St. Cli, Rs-

                                                                         wisc
                                                                                                                                                                                L-k,
                                                                                                                                                                               St. C,

                                                                                                                                                                       Ali-
                                        z     Cl
                                                                                                                                        G
                                        N     0        H                                                                           1.1al
                                        0     H        T--                   IL

                                              z

                                                                                                                                                                                              .. ... ........ . .

                                                                                                                                                                                            .... .. . ....
                                                                                                                          ANA
                                                                                                                                                                                               .................
<pb n="209" />

                                                     194

               in which the potential work force lived at present, there may be more in-migra-

               tion to the local community.

                       Another factor is that the contractor and subcontractors may bring a
               portion of the labor force in with them, especially for the managerial and
               highly skilled engineering positions [4511. Thus, if non-local construction
               firms were used, it is likely that at least a portion of the work force would
               be brought in form outside of the area.
                       Labor union practices are also important in determining the geographic
               origin of the construction work force [451]. How jobs are distributed to mem-
               be@7s of the various.craft locals'will influence the mix of commuting versus

               resident workers:

                       It was found to be a general rule that the location of the
                       union had much to do with the housing and commuting patterns
                       of the work force. For instance...more people commuted to the
                       job site from Leominster and Fitchburg [Massachusetts], a dis-
                       tance of roughly one hour by good road, than might have been
                       expected. The cause of the heavy commuting was the fact that
                       mose of the-carpenters working on the site were from the
                       Fitchburg7Leominster area [and] nearly all the field employees
                       commuting from that area were, and are, carpenters [451; p.175].

                       Another factor that should be considered is the condition of the local

               (i.e, commuting) construction labor market. If unemployment among the skilled
               trades is high, then more local commuting might be expected. If, on the,other
               hand  the available labor force is fully employed, then immigration from other
               regionS may provide a large percentage of the needed workers.

                       There are three patterns of work force entry to th e local area: daily
               commuting, Monday-Friday commuting (where the worker stays in the area during
               the week and travels to a permanent home over the weekend), and relocation to
               the local area for the duration of the project. In general, the first case, a
               daily commuting force, "generates minimal fiscal, social, or political impacts
               on. a host community" [hypothesis advanced in 600]. In a study of the cultural
               system impacts of two nuclear facility construction projects (Pilgrim I in
               Plymouth, Massachusetts and Millstone I in Waterford, Connecticut) in which
               daily commuting was common, the following conclusions were drawn:
                       Social, political, and economic impacts upon the towns of
                       Waterford and Plymouth during construction of their respec-
                       tive nuclear plants have been minimal. The only impact of
                       any magnitude identified retrospectively is construction
                       worker traffic.
<pb n="210" />

                                                   195

                   Most construction workers in the case of Pilgrim I and
                   Millstone I and II commuted t  o the site from their
                   existing place of residence within the metropolitan
                   areas rather than relocate closer to the site or,within the
                   host community. As a result, little impact on commercial
                   activity was noted in either community during construction.

                   In both Plymouth and Waterford, little interaction took
                   place between construction worker crews and local towns-
                   people. What interaction did take place was primarily
                   in local grocery stores and taverns.

                   Speeding by construction workers appeared to     be a problem
                   in Waterford and Plymouth. In Waterford, a police officer
                   had to'be stationed at the entrance to the construction site
                   each night in order to control speeding onto secondary
                   town roads [600; pp.9-.10].

                   In the case of Monday-Friday commuting by the project workers, the poten-
          tial impacts  may be somewhat-more important, depending on local socio-economic
          conditions.   During the week, the workers would require housing, food,, and recre-
          ation. in the local area. However, they would probably not spend a large        portion
          of their wages locally, preferring instead to send most of it to their families
          for living expenses elsewhere. This means that service industry requirements
          would be minimal. Also,'because the workers do not relocate their families into
          the local area:, impa:cts on the schools and other family-rela.ted systems would be
          insignificant.
                   This is not to say, however, that Monday-Friday commuters may not-cause
          significant local impacts. The 'need for housing,.especially of a "boarding
          house" type, for@'the workers during theweek may cause changes in the local
          housing mix and price structure.    Conversions of large single dwellings into
                                                                                  Existing
          multiple units may  increase availability to offset this demand.

          rental housing may  be diverted away from those who would normally rent it as
          well. Rents   may rise as the demand increases, especially as local landlords see
          an opportunity to increase profits at the expense of the construction workers
          (whose median income may be considerably higher than the local norm). Because
          of this, low-income residents of"the area may be forced into lower quality
          housing than they could afford prior to the project. Finally, the housing mix
          established as a re'sponse to the project   will exist a  .fter.construction has
          ceased, which may leave the local communities'with an overabundance of poor

            A secondary impact may be an increase in building code violations and the'need
          for an expanded inspection and enforcement program.
<pb n="211" />

                                                      196

               quality rental units [451]. Also, rents may fall once the work force leaves the
               area, causing significant local income effects.

                      ,There will also be impacts felt in other sectors of the local economy.

               Food sales may increase, both at markets and restaurants and cafes. Tavern and
               bar sales may also increase [451]. As in the case of housing, market demand-
               response expansion and inflation may occur in these areas during the construction-
               period followed by a sharp decline once the project ends. It is not likely that
               there would be significant increases in the durable goods market.
                       There are, of course, many factors operating to mitigate these potential
               problems. For one, the magnitude of these problems will depend on the local
               economic and social structure. It would be reasonable to assume that, in general,
               a large metropolitan area would be better able to absorb the work force without
               significant change than would a rural town or small city. Care must be taken not
               to over generalize, however, and to examine the economy of the proposed site
               localities in-detail to determine how important these effects might be. For
               example, the impacts, particularly with respect to housing, may be considerably

               less in areas oriented to a seasonal tourist economy, where excess capacity may
               be available for rent.    Also, areas with stagnant or declining populations may
               have an' excess supply of housing available and, thus, be more able to absorb

               the influx of workers.

                       In addition, the construction workers may not locate in one area but
               rather, spread out into surrounding localties. This avoids a concentration of
               the impacts of this phase (subject to the qualifications discussed with respect
               to local fiscal effects below).
                       In some cases, a substantial portion of the work force may relocate into
               the locality of the project. The impacts of such an immigration can be signifi-
               cant, subject to the caveats discussed above. Demand for housing in this case
               will be shifted away from the "boarding house" market, into family dwellings.
               This may cause a decrease in availability of rental units and a limited increase
               in new home starts. An important source of housing for construction worker
               families is the mobile home sector [4511. Because rapid development of mobile

               home.parks can bring problems with public service support and conflict with
               existing residents (especially in areas of limited experience with this form of

                 Owners may also prefer to rent to construction workers on a Year-round basis,
               rather than depend on temporary tourist occupancy.
<pb n="212" />

                                                  197

          housing), the expansion of these facilities should be     carefully planned and inte-
          grated into the local system.
                   An overview of the local response to the demand for new.housing has been

          summarized as follows:

                   Recent population trends and the. age structure of the local
                   population are important: in an area which is stagnant or
                   declining in population, and which has, relatively few younger
                   people, rooms or larger parts of existing houses may be in
                   great supply and obviate the need for other sources. An area
                   which is growing rapidly and has many young families is more
                   likely to meet some demand with Permanent housing, because
                   such housing is likely to be saleable or rentable after con-
                   struction ceases.

                   The availability of sites for  mobile home Parks, the import-
                   ance of tourism (and, thus, the abundance of motels and inns),
                   and the attitudes of owners toward conversion and renting
                   space to strangers are all relevant factors. The general
                   amenities'and quality of public services will also influence
                   choices of workers, especially those bringing 'families.
                   Thus, the sources of supply of housing which are easily
                   expanded in particularly favored communities will weigh
                   heavily in determining the mix for the whole region [451; p.179].

                   In addition to demand for new housing and associated services, there will
          also be a general increase in local business activity. As in the case of the
          weekend commuting, food and food service sales will increase, although to a
          greater extent in this instance. There will also.be increases in other sectors,,
          including both durables and nondurables as family-oriented demand rises.
                   As a net result, more of the c6nsturction payroll will be spent locally,
         'generating secondary income benefits. The size of this income multiplier effect,
         ,as it is called, is determined primarily by two important factors,.the marginal
          propensity to spend locally (c), and the fraction of sales that becomes local
          income (h).    The general formula is:

                                        multiplier       1
                                                      1-(c)(h)

          The larger the value of the multiplier, the greater the secondary     income benefits.
                    The marginal propensity to spend locally is simply the fraction of      total
          income spent on locally provided goods and services. As such, it depends on the.

            This concise explanation of a potentially complex concept is taken from
          reference 451.
<pb n="213" />

                                                       198

               .mix of goods available locally, relative prices between local and imported goods,
               the availability of imports, and the type of goods and services desired.
                        Finally, movement of families into alocality for the,term of the pro-
               ject could have impacts on other services, such as schools, sewers, health care,

               police, churches, etc. The school,system especially could be adversely affected,
               as enrollment increases, but only for a short period (2-7 years). Because the
               crowding  is only temporary, new additions may not be warranted. This does, of
               course, depend on the enrollment in the system relative to capacity before the
               project begins.

                                (b) Movement of material through the local area

                        In addition to a movement of workers,to the site of a new energy facility
               there is also a large-scale movement of material:
                        All plants require substantial amounts of materials to be
                        moved to the plant site. The most important of these are
                        the concrete required for build 'ings and dams; steel for.
                        concrete reinforcing and for structural frameworks; and
                        large pieces of equipment, such as turbines, parts of
                        boilers, pipes, etc. These materials can be moved to the
                        construction site by any one of three ways, by truck, by
                        rail, or by barge, depending upon how accessible the site
                        is to each of the modes and where the materials are being
                        shipped from. In general, the greater the dependence on
                        highway transportation, the greater the impact on the
                        surrounding communities [451; p.130].*

                        The major transportation-related problems are local system congestion
               (both by worker traffic and material delivery to the site), increased risk of
               accidents, and deterioration of the roadbed, curbs, and bridges.
                        There may also be local improvements to the transportation system brought
               about by the project. For.example, relocation and improvement of existing road-
               ways could provide improved access for the local residents after the construction
               period has ended.
                        Related to the movement of construction materials through the local area
               is the local purchase of materials to be used at the site. If the area is
               highly industrialized and produces'structural steel, piping, equipment, or other
               materials, then a significant share may be bought locally. However, if the area
               is rural with little heavy industry, then the locally purchased material will

                 See diszussion of Transportation Access Requirements indescription of,nuclear
               power plants.
<pb n="214" />

                                                    199

           most likely  be limited to sand aZd gravel.

                            (c) Impacts of the facility's presence
                   The presence of a major new energy,facility, even      prior to its operation,
           can produce significant changes in'the local socioeconomic system. One of,the
           most obvious of these impacts is the addition to the.local tax base.         IA new
           facility valued at several hundred million to more than one billiondollars will
           pay several million dollars per year in property taxes upon completion.          Assum--

           ing that total tax revenue to the local jurisdictions remains constant, this
           would mean a tax reduction for all other property owners. 'The size of this re-
           duction depends, of course, on the tax value of the plant relative to the total
           local tax base. Figure 15 illustrates the range of.effects that a new plant
           might have on the tax rate as its share of the tax base changes.

                                                 FIGURE 15

                                      EFFECT OF A MAJOR NEW FACILITY

                                          ON THE LOCAL TAX BASE

                          E-1 10 0

                            eo

                          0

                            40

                          ILI

                          a L, 0

                                         .........
                                  10        50           100         150
                                            Plant tax value as proportion of origirc.1 tax base

                                                                         [Source     451]

             It will also produce property tax revenue throughout the period.of construction
           in proportion "to the   total amount expendedby the utility oninvestment to
           date" [451; p.1941.
<pb n="215" />

                                                     200

                       In a case study of two towns within which nuclear generating plants pro-
              vided 50-60 percent of the local tax  base, workers from Oak Ridge National Labo-
              ratory found the following:
                       The majorimpact of the nuclear plant in both Plymouth and Waterford
                       is the large increase in tax base provided by the operating reactor.

                       One option chosen by both communities has been to lower (or stabi-
                       liz6) the existing tax rates while currently using the additional
                       revenues to significantly increase public services and facilities.

                       Both communities have taken some steps to professionalize adminis-
                       tration of services through hiring,new staff and creating some new
                       positions in local government. In'both communities, new depart-
                       ments of public works have been established and town planners.
                       have been hired to control future land use development. In
                       Plymouth' a town manager has been hired to oversee local
                       affairs [600; p.10].

                       In addition, to direct tax benefits from the new facility, there will be

              some secondary tax revenue gains. For example, new housing for construction and
              operating employees will expand the facility tax base. Also, market value of
              commercial property may increase in expectation of higher profits [451]. Finally,
              there may be added benefits in cases where local communities can levy sales and
              income taxes, especially during the construction period.
                       These benefits do not accrue without offsetting costs, however. The Oak
              Ridge study cited above also has identified a number of problems created by the

              new facilities:

                       External relationships of the two communities have been altered
                       by the presence of the nuclear power plant, principally because
                       of the augmented tax base., The presence of the nuclear power
                       plant may create new tensions or exacerbate existing tensions.

                       Efforts have been initiated in both states to redistribute the
                       utility tax payments so that a larger proportion will go to
                       other jurisdictions and/or the state.

                       Neighboring towns have, in varying degrees, become resentful
                       or antagonistic over the favored'status and resources of the host
                       communitIy. The transportation of nuclear waste.through neighbor-
                       ing towns in both Plymouth and Waterford has caused some concern
                       and hasIresulted in challenge of the legality of the transfer of
                       that waste.

                       The sudden population growth occurring in Plymouth since 1968
                       (the beginning of the nuclear plant construction) was intensi-
                       fied by construction and operation of Pilgrim I, but growth
                       would have occurred soon because of regional growth patterns
<pb n="216" />

                                                   201

                   and proximity t1o.Boston. Growth was one consequence of the low-
                   ered tax rate in Plymouth t600; pp.11-121.

                   While these conclusions are-based on the study of a specific situation,
           they do highlight a problem that may be true in the general case.. That is,
           while tax revenue (especially property tax revenues) generated by the facility
           accrues primarily to the host,jursidiction, the costs may be shared with several
           surrounding communities.
                   There are other problems related to local fiscal effects as well. For
           example, the actual assessment and taxing procedure may be very complex, causing
           problems for-local officials. There are sometimes.problems with deciding what

           portion of the'facility is taxable, how to tax transmission line easements, how
           the presence.of the plant or.constrluction activities affect neighboring property
           values, etc. [451]. Resolution of problems such as these may be beyond the
           capability of local.administrators.
                   Another problem is that plannning    and implementation of programs to miti-
           gate adverse impacts, especially during the construction     phase,.must be done
           before the project begins...Tax revenue to finance these     programs, however, is
           notavailable until after construction has begun (see Table 22). This lag
           effect can produce dislocations in thelocal fiscal picture.

                                                 TABLE 22

                                     TAX PAYMENTS DURING   CONSTRUCTION

                                      OF THE JIM BRIDGER  POWER PLANT

                            Tax Year                                Property Taxes
                              1972                                     $   37,000
                              1973                                        490,000
                              1974                                     1,285,000
                              1975                                     3,000,000
                              19716                                    4,000,000
                              1977+                                    5,000,000

                                                                    [Source   451]
<pb n="217" />

                                                   202

                     Another source of monetary benefits is the interst paid on the bonds to
             construct the facility. However, it is likely that  these monies will be spread
             out among a large group outside of the local area and, hence, will riot add direct-
             ly to local income.

                     In addition to monetary costs and benefits, the presence of a large
             energy facility will have other impacts of both a local and regional scale. In
             many cases, at"least a portion of the land used for such a facility will be
             unavailable for other uses for at least 30-40 years. The long-term commitment
             of a site of the size considered here (range of 300 to approximately 3,000 acres)
             will affect development patterns on a local and,, perhaps, a regional scale. In
             addition, potential uses displaced by the facility must be considered, especially
             in terms of alternative sites available to them. This analysis should also in-

             clude possible.uses of water resources that may be preempted in the long term.
                     Related to this is the problem of potential land use conflicts that may
             arise, both in terms of existing development patterns and future changes. A
             large facility does not exist in a vacuum and must be related to the socio-
             economic matrix within which it is located. Included in this is the problem of

             aesthetic disruption and visual intrusions which may be considered to be a
             measure of harmony between human artifacts and the existing environment. Natural
             draft cooling towers, tall stacks, and large distillation and cracking-towers
             can significantly degrade the quality of. surrounding environment.

                             M Summary

                     The evaluation of facility impacts during the construction and pre-
             operational stages is a complex and confusing task. The discussion presented
             above covered only part of the picture, giving major highlights without filling
             in the many gaps and details needed to do a complete analysis. Table 2.3 presents
             a list of potential construction phase problems. Used in conjunction with the
             facility activity impact matrices, it should present at least a starting point
             in evaluating the cultural impacts engendered in the construction of a new
             facility.

                     C. Operating Impacts
                     The major impacts caused by the operation and maintenance of a large
             energy facility are related to the production,,storage, and release of residuals
             to the water, air, and land. In contrast to the construction phase impacts
<pb n="218" />

                                                                                                                                                                                                       TABLE 23

                                                                                                                                                                               CONSTRUCTION IMPACT                                                   SUMMARY

                                                                                                                                                                                                                       IDENTIFICATION                OF POTENTI,L                                                             I DEN T IF I C f-T 1 CN Ot
                                                                                 ITEM OF                                           COMMUNITY FUNCTION                                                                  PRIMARY CONDITION CHAtGES,                                                                             VAJOR ENVIR0NMLNrAL
                                     ACTIVITY                                    AC71VITY                                          PRACTICE, OR VALUE                                                                  NUISANCES,                 AND BENEI`I@S                                                               A!.D SCCICIECONOMIC IMPACIS

                                                Wcrk Force                       A .      Services                                 I      Lodg i ng                                                                    CHANGES I                  N :Ne ed fo r ho@s i                                        s co            Sc hoo 1 s ; r,!                o t i             L, s o
                                                                                                                                   2      Transportation                                                               @'ater s@ppl               Y, medical, F"st.1                                          an              of "z' t@ ..':n 1, ,            p I a              "d
                                                                                                                                   3-     Schools &amp; churches                                                           police 3ervi               ces.                                                                        old QpL- spasc.                        F1 c     '-s'
                                                                                                                                   4.     Lit i I I t I es                                                                                                                                                                                               Q f         r. e     ;     I n
                                                                                                                                   5      M e d i c a I                                                                N U I SA N C E S           Disposal of garb2-.e                                        solid           creastj tr._-@fi                c 1 c      d s
                                                                                                                                   6      Police &amp; fire                                                                wa s t e s ,               in @ ieased peak traffi              c 1 n a @ E ,          a.- d
                                                                                                                                   7.     Recreational                                                                 overloading                o f t e I ephon.e s y s
                                                                                                                                   8.     Commerical
                                                                                                                                   9.     Postal                                                                       BE 141@.F I TS :           Increased taxes and                                         -a-..e for
                                                                                                                                                                                                                       pub I i @ u t              ; I ities; exp2rsion,of                                     -@c . c31
                                                                                                                                                                                                                       services, postal, and food s-                                                          ice@

                                                                                 B.       Social Aspects                           I      Labor force                                                                  C HAN G E.S - 1            N ;Mix cfprofessic@a                                        1 a 7.          Pe I o c'@      i o n c. f h @'Ic               I n d
                                                                                                                                   2      E, p I oy"'e         t                                                       technical workers, infl                          ux of sk                              iI led          prop-rty; ir.c-azed -ipluy-
                                                                                                                                   3.     Cultural patterns                                                            labor, family life pressures.                                                                          me l t ol;@ o          I u.. i L

                                                                                                                                                                                                                       N 't I S AN C E S          :Population           d c n s Lt y ,                        p r,2 @ s u . a
                                                                                                                                                                                                                       on xtx i s t               ing local wage        rates, re                             1 cra t 7 on
                                                                                                                                                                                                                       of homes, and changes - proper*ly c@@ers!hip.

                                                                                                                                                                                                                       3 ENE F I TS               :Increased emplcy;@tnt                                      o@Dort r.
                                                                                                                                                                                                                       ties for                   skilled and un5kil?ed @c,',ers.

                                     I I -      Ove@ ra I I                      A.       Business                                 1.     Agricultural                                                                 '.@iANGES    -             IN: Size of certain @is                                     ;r,c@s es-,=@-  Dernand for
                                                Development                                                                        2.     Commercial                                                                   li5hmerts                  ; land use, zoning -I                                       sewera;e                                          a-1 roe.
                                                                                                                                   3.     Industrial                                                                   ordinances;                demand for recreazion, e.n:ertain-
                                                                                                                                   4.     Miaeral                                                                      ment, and other lesiure-time activ:-ies.
                                                                                                                                   5.     Forestry
                                                                                                                                   6.     Recreational                                                                 NUISANCES:                 Periodic crowding of cormerc                                       ia I                                                                                                                    IQ
                                                                                                                                                                                                                       Tarking areas, picnic, and recreationil
                                                                                                                                                                                                                       areas  ; solid waste d                    isposal, sedimer@t and
                                                                                                                                                                                                                       the@ pollULants rel                      ated to ne-@ bisiness
                                                                                                                                                                                                                       construction.

                                                                                                                                                                                                                       BENEFITS:                  Increased spending for food,
                                                                                                                                                                                                                       drugs, heating fuel, gasoline, lu                                                      ber,
                                                                                                                                                                                                                       leisure time activities, and rentals.

                                                                                 B.       Aesthet         ics and                         Scenic views                                                                 CHANGES IN:                Accessibility and relative                                                  Pu@lic attitud@s--@
                                                                                          Human Interest                           2.     Wilderness areas                                                                                                                                                                    I
                                                                                                                                                                                                                       security of wilderness areas, laolnar@.s,                                                              'istcr'c cc,flic"-
                                                                                                                                   3-     Unique physical features                                                     and rare and               unique species.
                                                                                                                                   4.     Parks and reservoirs
                                                                                                                                   5.     Open space                                                                   NU ISANCES:                Visual      pollutior.           , e,-.o t ; oi a I
                                                                                                                                   6.     Moniments and                                                                c Iashes, adversary                     ercouniers;                                    litication,
                                                                                                                                              landmarks                                                                tlme delays due to                     public opposit;cn
                                                                                                                                   7.     Rare and unique species
                                                                                                                                              of plants, mammals,                                                      BENEFITS:                  Public discussion and deci-ic,n
                                                                                                                                              &amp; birds                                                                  making.
                                                                                                                                   8.     H i storical and archaeo-
                                                                                                                                              10 9 1 C a I

                                                                                 C .      Transportation                           I .    Truck and rail deliveries                                                    CHANGES IN:                Traffic volume, required fuel
                                                                                                                                              .of heavy equipment and                                                  suppl ie;,-.
                                                                                                                                              construction materials
                                                                                                                                   2.     Heavy construction equipimen                                  t              ".LS _AY@±_@_              Increased den,ands an locals to
                                                                                                                                                                                                                       provide fuels and lubricants: load                                                     1 1 m ; t son
                                                                                                                                                                                                                       roads and small bridges necessizazina @eli                                                    ve r v
                                                                                                                                                                                                                       route changes; low underpasses req-r;r9
                                                                                                                                                                                                                       alternate highway and railroad ro,;Les                                                 : eve  r-
                                                                                                                                                                                                                       sized loads causing tree dara@e: increzcedl
                                                                                                                                                                                                                       noise and exhaust emissions.

                                                                                                                                                                                                                       BENEFITS: Ne. bridges and/or rcads to
                                                                                                                                                                                                                       Tate ;:,creased load weights, creazicri of
                                                                                                                                                                                                                       docking and rail-head utiloadirci f@scilities,
                                                                                                                                                                                                                       increased job opportunities for locals to
                                                                                                                                                                                                                       provide fuels and road and vehicle rainten-
                                                                                                                                                                                                                       Ance

                                                                                                                                                                                                                                                                                                                                                        [Source                          173]
<pb n="219" />

                                                    204

              which are primarily related to the cultural environment, those produced by plant
              operations ten&amp;-to be more closely tied to the natural environment. This is not

              to say, however, that they do not affect the cultural system, but rather that
              their impacts are generally channeled through the natural system. For example,
              changes in air quality caused by plant emissions could lead to public health

              problems and reductions in land values close to the plant site.
                      In many cases, the linkages between these natural system changes'and
              resultant changes in the cultural system are poorly understood. Th s is es  Ipe-
              cially true where those changes require long periods of time to  accumulate and

              become measurable. As a result, a discussion of the environmental impacts caused

              by facility operation must deal primarily with identifying the residuals produced

              rather than the effects of those residuals on the natural and cultural

              environments.

                          (1) Fossil Fuel (Coal-Fired) Power Plants
                     .Table 24 presents a general summary of the types of impacts associated
              with the major activities in the power generation fuel cycle, while Figure 16
              diagrams the major impacts specifically related to the operation ofla coal-fired
              power plant. The discussion below is organized by major activity types as de-
              fined previously and shown in Figure 16.   For a discussion of the impacts related
              to fuel transshipment and storage, the reader is referred to the section on Coal
              Transshipment and Storage Facilities.

                              (a) Plant operation
                      Table 25 presents estimates of the air-borne effluents produced by a
              1,000-MWe plant both with and without emission controls. While this type of
              information may not indicate the effect of these emissions on the environment,
              it does at least provide guidelines as to the scale of the.problem.
                      The impacts and interactions of these air-borne residuals on t he environ-

              ment are generally not understood at this time., Of the major pollutants listed
              in Table 25, the one most easily controlled at present is particulate matter.
              Current control technology allows collection efficiencies greater than 99 percent
              [546, 2222 451, and others]. For this reason, the most visible effects of

                The entire fuel cycle has been included here to provide the reader with   a
              broad perspective of the impact picture. Only those activities directly related
              to this report are discussed further.
<pb n="220" />

                                                                           TABLE 24

                                                                  SUMMARY OF FUEL CYCLE IMPACTS

          FUEL CYCLE ACTIVITY           WATER                             AIR                          LAND                           BIOTA

           Extraction             siltation, pH                  particulate emissions            soil erosion               disruption of habitat
                                  changes                                                                                    altered successional
                                                                                                                             patterns, toxic
                                                                                                                             compounds, radiological
                                                                                                                            @iMpaCL
           Transport              accidental                     particulate and'                 right-of-way               disruption ot habitat
                                  releases                       gaseous emissions,                                          toxic compounds
                                                                                                                             radiological impact
           Preparation            effluants,                     particulate and                  solid .4astes,             disruption of habitat
                                  heat rejection                 gaseous emissions,               physical plant             toxic compounds
                                                                                                                                                             U1
                                                                 heat rejection                   siting                     radiological impact
         *Conversion              tberma. 1                      particulate and                  solid wastes,              disruption of habitat
                                  dischar ges,                   gaseous emissions                physical plant             toxic compo-unds,
                                  toxic compounds                                                 siting                     radiological impact
                                  consumptive water use
         *Transmission                                                                            right-of-way               alteration of
                                                                                                  maintenance                habitat, disruption of
                                                                                                                             landscape homogeniety,
                                                                                                                             biocides
        *Disposal                 heat rejection                 gaseous emissions,               dedication of              releases of toxicants,
                                                                 heat rejection                   repository land           @radiological impact

                                                                                      Discussed further in text

                                                                                                                [Source - 501]
<pb n="221" />

                                                                                                206

                                                                                        FIGURE 16

                                                                             DIAGRAMATIC SUMIJARY OF
                                                         COAL-FIRED POWER PLA14T ENVIRONMENTAL IMPACTS

                                                                                                   A

                                                                                  Coal filosaga
                                                                                  at the Plant

                                                                                   rw.twdi..m. d..Ud.

                                                                                                                              Who, -HC

                                                                                                                                Air - H,O
                                                                                                                              ' FW
                                                                                                                       convemion
                                                                                                                       Plant

                                                                                                                                    . . .... wl.n

                                                                                                                           0 i$110sal of Ash
                                                                                                                           and Solid Wastes

                                        f A                                                                                            ... . .. P-6-]

                                                                                                                                          Wid.

                                                              WO                      Dry
                                            Cooling   I       cooling                 co.liml,
                                            Pond              To-.r                   Tower

                                         dt-5-                                             ... ....
                                                                                                                     -.d @Wl.
                                                                                  Coal
                                                                                  a. "a Plant
                                                                                              .d @...d.

                                                                                                                             A

                                                                                                                                           [Source            501]
<pb n="222" />

                                                                     TABLE 25

                                              SUMMARY OF COALrFIRED POWER PLANT AIR EMISSIONS

                                                                   Nitrogen      Sulfur
                                                      Primary                               Particulates     Thermal         Solid
                          Description                               oxides       Oxides      (103 tons)    (1 012 Btu's) (103 tons)
                                                    Efficiency (103 tons)      (103 tons)

             i Coal: Conventional steam
                      No controls                       38           21.8         119.2          48.5          31.1           298

               Eastern Coal: Conventional'
                Boiler with  wet limestone
                scrubbing                               35           19.2          16.0          3.2            0             955

               Eastern Coal: Conventional
                Boiler with magnesium oxide
                scrubbing                               35           191.2         16.0          3.2            0             410

                                                                                                                                                  0
               western Coal: Conventional
                Boiler with wet limestone
                scrubbing                               35           25.0           5.1          2.2            0             487

               Physically Cleaned Eastern
                Coal: Conventional Boiler
                with wet limestone scrubbing            35           17.6           6.4          1.4            0             417
               Coal: Steam plant with controls          38           23.2          19.1          2.6            .0           1,009

                                   Based on data developed by Hittman [400 and 401]
                                 2 Based on data from Battelle [545]
<pb n="223" />

                                                        208

               particulate emissions, thick, dark smoke, and deposition of dirt on surrounding
               property, can be eliminated.
                       While the overall removal efficiency may be high, the ability to control
               the fine particulates (&lt;l@i) is markedly lower. Recent studies have indicated
               that trace metals (such as arsenic, beryllium, cadmium, maganese, mercury,
               nickel, and vanadium) have a high affinity to this fine fraction [546]. Table
               26 shows estimates of emission rates for these trace elements. The toxicity of
               many of these elements has been documented and there is some concern regarding
               the long-term effects of chronic, low-level exposure.

                                                   TABLE 26

                                        TRACE ELEMENT EMISSIONS OF A

                                      COAL-FIRED POWER PLANT (1000MWe)

                                              lbs/ton of coal burned  1      tons/yr 2

                              Arsenic                   0.003                  5

                              Beryllium                 0.0003                 0.4

                              Cadmium                   0.001                  0.001

                              Manganese                 0.080
                              Mercury                   0.0004                 5

                              Nickel                    0.003                  0.5

                              Vanadium                  0.0005

                              Lead                                             0.2
                           1 [5461     2 [2031

                        Also of increasing concern is the emission of trace radioactive mate--
               rials in particulate form, primarily as uranium and thorium and their associated
               daughter products [203]. While comparison with nuclear plant emissions is dif-
               ficult because of the large number of variables involved, one study has indi-
               cated that they fall "intermediate between the annual dose from PWR and BWR
               nuclear plants"jcited in 203; p.1741.
                       Other effects associated with particulate emissions include the
               following:
                           Action as a catalytic agent in reactions involving SOX and/or-NOx
               (discussed  below)
<pb n="224" />

                                                209

                    Vehicle for carrying toxic materials deep into the respiratory tract
                  6 Reduction of direct sunlight

                  * Reduced-visibility
                  e Interference with plant physiology
                  * Adverse effects on animals eating'plant materials with particulates
         on them  [203]

                  The principal oxides of nitrogen released  to the atmosphere during the
         combustion process are NO (nitric oxide) and NO  2' (.nitrogen dioxide). Most of
         the NOx  produced in the boiler is NO, a portion of which is converted to NO  2 upon
         reaction with oxygen in the atmosphere via a photo-chemical reaction [203]. The
         effects of NOX in the environment are just now becoming clear. They are "now
         recognized as prime contributors to the eye-irritating smog characteristic of
         Los Angeles area" [451; p.1151. Other studies [cited in 203] indicate serious

         health effects:

                  At ambient concentrations, N02 presents a direct threat to
                  general health, while NO does not-except in its ability
                  .to be converted to N02-

                  Nitrogen dioxide exhibits primary toxicity to the lungs,
                  and levels above.about 100 ppm are lethal to most animals.
                  Repeated exposure to N02 in sub-lethal doses has resulted
                  in early pulmonary emphysema-type lesions in the experi-
                  mental animals. Long-term exposure to N02 concentration
                  that does not cause acute inflammatory responses may have a
                  significant role in the development of chronic lung disease...
                  Other effects of atmospheric NOx are corrosion damage and
                  crop reduction...[203; p.172].
         In general, research and development of NOX  control systems for power plants have
         been quite limited, primarily because the automobile is presently the major con-

         tributor to air-borne oxides of nitrogen.
                  As discussed previously, air pollution control efforts by the electric
         utilities have concentrated on theredUction of sulfur emissions (SOX) from the
         combustion process. The main species of SOX formed in the combustion chamber is
         S02 (sulfur dioxide). In general, S02 by itself does not exhibit any major
         deleterious effects [521]. However, once in the atmosphere, the S02     participates
         in a number of chemical reac tions resulting in several products, each capable
         of some degree of environmental damage. The processes by which these conversions
         take place "are complex and incompletely understood" [521; pp.xxii-xxiii].

           See discussion of Emerging Technology in Fossil Fuel Power Plant.
<pb n="225" />

                                                      210

                       When S02 is emitted to the atmosphere, a fraction of it is oxidized to
               form H2so4  (sulfuric acid). While the reaction normally occurs relatively slowly
               (0.1 percent per hour), it is greatly accelerated by the presence of other air
               contaminants (trace metal ions, hydrocarbons, and nitrogen oxides). Once formed,
               the sulfuric acid may then react with trace metal ions (found in conjunction
               with the five particulates discussed above) to form particulate sulfates. Even
               in the absence of this oxidation reaction, the SO 2 may dissolve in water vapor,
               forming the weakly acidic surfurous acid (H 2so 3).
                       The effects of SO 2 and its by-products can be observed throughout the
               natural and cultural environments.
                       The major impact of airborne SO 2 is probably on vegetation.
                       These effects are due to the direct effect of acid formed on
                       the surface of leaves in combination with moisture and to S02
                       gas.penetrating.into the plant tissues..." [498; p.29].
               In terms of its impact on man, SO 2 is primarily a pulmonary irritant:
                       Massive acute doses can result in severe respiratoryreactions,
                       chronic low level exposure may lead to chronic obstructive lung
                       disease. The secondary reaction products of S02 in the body may
                       result in additional potentially systemic effects" [498; p.301.

               The synergistic effect of SO 2 and fine particulates may be potentially more seri-
               ous due to the formation of sulfates and the ability of the particulate material
               to carry them deeper into the respiratory tract [498 and 521]. "Animal studies
               and the recent ... epidemiological studies indicate that sulfate aerosols are the
              fform of airborne sulfur primarily affecting man's health" (498; p.32]. However,
               the health effect findings are not completely clear:

                       First., the chemical form of the sulfates that are associated
                       with increased mortality and morbidity has not yet been
                       clearly identified. Second, there have been few direct
                       epidemiological studies linking excess mortality to sulfates.
                       Rather sulfate concentrations were usually estimated based on
                       correlations with particulates and sulfur dioxide (a correla-
                       tion which has been shown to be low) and these estimates were
                       related to'health effects... Finally, case studies (e.g.,
                       London) tend to indicate that attainment and maintenance of
                       ambient standards for S02 and particulates will protect public
                       health [393; p.A-7].

                       In addition, sulfur emissions can affect materials as an acid increasing
               corrosion and'deterioration of "painted surfaces, metals, building materials, and
                 Seet521]for a more complete description of these reaction sequences.
<pb n="226" />

                                                211

         fabrics" [498; p-31].   They also can reduce visibility at high concentrations.

                 Appendix E contains a list of the observed effects of the three major
         air contaminants associated with fossil fuel power plant operation (particulates,
         NO 2') and SO2), taken from a report prepared for the Michigan Public Service Com-
         mission (393]. While they are not the only important pollutants associated with
         plant operations, they are the ones for which standards currently exist and,
         thus, should be highlighted. However, consideration of a much broader range of
         pollutants, including the secondary products of these three, should be a part of
         a site selection and/or certification procedure.
                 Wastewater effluents other than those associated with the cooling system
         arise from several sources: main steam boiler blowdown, demineralizer regenera-
         tion wastes, floor drains, sanitary wastes, and ash sluicing water. Most of
         these waste streams are relatively small compared to cooling water return flow.
         (Even a closed-cycle system blowdown flow can be several thousand gallons per
         minute.) Some are subject to standard treatment practices (e.g., sanitary
         waste treatment and the use of.ash settling ponds to- significantly reduce sus-
         pended solid loads in ash sluicing water).
                 The impact of these effluents will depend on the volume of flows, treat-
         ment received, the discharge structure configuration, the nature of the chemicals,
         and the assimilative capacities of the-receiving waters.
                 The impact of these chemicals on human populations is generally
                 not direct, because natural processes of dilution and chemical
                 reactions reduce the concentrations to negligible levels at
                 the point where.water is withdrawn for human uses [203; p.156].

         Specific details of potential impacts on the aquatic ecology are difficult to

         quantify because of the wide variety of variables and the complexity of inter-
         actions (most not yet understood) involved.
                 Leaching of toxic materials from the ash storage pile may represent a
         serious threat to the quality of the ground-water supply.
                 Direct cultural system impacts arising from the operation of a coal-fired
         power plant are not nearly as significant as those possible during the construc-

         tion phase. As indicated in Table 12, the operational work force for proposed
         plants ranges from 120-693 persons. Estimates from other sources indicate a
         somewhat smaller range: 150-300 [2031, approximately 160 [451], and 120 [526].
         Unlike the construction force, however, the operating personnel will become part
<pb n="227" />

                                                     212

              of the permanent residential base in the local communities:
                       ... the induced effect on local business and employment in other
                       industries will be substantially greater than the effects of the
                       same number of construction employees. They will tend to spend
                       a greater proportion of their income in the area, and their
                       housing needs will be more permanent and substantial. This means
                       the property tax collections per employee will be higher, but of
                       course their demands on public services will also be higher.
                       They and their families are much more likely to take active roles
                       in the community, especially as they have above-average education
                       and income. In a sparsely populated region, the addition of even
                       50 or so such families may make an important difference in social
                       and cultural life, and the work of civic, charitable, and frater-
                       nal organizations [451; p.177].

                               (b) Cooling system operation
                       Presently, one of the activities of concern related to the operation of
              a power plant (both fossil fueled and nuclear) is the dissipation of waste heat

              via the condenser cooling system. The potential impacts, particularly to the
              aquatic ecology, may be significant and must be considered in a facility evalua-
              tion procedure. Discussion as to what these impacts are has been grouped by

              cooling system type below.

                                   (i) Once-through cooling
                          Once-through cooling systems have a minimal impact on the air and
              local meteorology, as most of the waste heat is carried to the receiving body.
              Likewise, they have the smallest land requirement and require no major structures
              that may conflict with the surrounding landscape.
                       It is the potential impact on the aquatic ecology that has generated the
              most opposition to the continued use of once-through cooling. These impacts are:
                       -attributed to (a) the mechanical and thermal shock to small
                       entrained organisms that pass through the cooling system pumps
                       and condensers-, (b) the effects of increased water temperature
                       on the biota in the receiving waters, (c) the entrapment and
                       impingement of fish on the intake screens, (d) the toxic effect
                       of chemicals introduced into the cooling water, and (e) the
                       effects of erosion and changing of ambient currents in the
                       receiving water. Because once-through cooling systems utilize
                       large volumes of water from the receiving body (rivers or lakes),
                       they have the potential for producing significant biological
                       impacts [203; p.1911.

                       The entrainment and subsequent passage through the condenser system of
<pb n="228" />

                                                213

          large numbers of smal 1 organisms is considered by some to be the leading environ-
          mental hazarA of once-through cooling systems [3801. While there are few studies
          available to show the magnitude of the problem in the Great Lakes, indications

          are that it may be significant:

                  In addition to the losses of fish caused by impingement on the
                  3/8-inch mesh traveling screens within power plant cooling sys-
                  tems on the Great Lakes, substantially larger numbers of fish
                  0.3-2.5 inches long are lost when they are drawn into these
                  plants and pass through the traveling screens (rather than
                  being impinged). ...Edsall and Yocum estimated a potential
                  entrainment of several million fish fry per day at two power
                  plants in southeastern Lake Michigan. Their estimate was
                  based on the abundance of fish fry in the lake near the cooling
                  water intakes and the cooling water use rates at the two power
                  plants.  Intensive studies of the kinds and numbers of fish
                  eggs and fry being entrained at plants on the Great Lakes and
                  their connecting waterways are now underway. Preliminary re-
                  sults of one such study being conducted at the Detroit Edison
                  plant on Lake Erie near Monroe, Michigan, indicate that more
                  than 300 million fish larvae may have passed through that
                  plant during April-August 1973. The fate of these larvae
                  was not determined, but the data indicate that some may have
                  disintegrated during passage through the plant, and the mor-
                  tality among the remainder must almost certainly have been
                  high [617; p.458].

                  While the importance of entrainment has recently.become apparent, the
          significance of thermal loadings has been discounted by some: "Thermal pollution
          is not the leading adverse environmental threat from power plants, as commonly
          has been believed" [380; p.v]. However, there is still a large body of evidence
          that thermal effluents can and do cause significant damage (see reviews of find-
          ings in 203 and 617). In general, most effects seem to be sublethal, involving
          changes in species composition, fish movement through the area, and spawning
          habits. Other temperature-induced effects include increased incidence of gas
          bubble disease, synergistic chemical reactions, and oxygen depletion.
                  Related to the discharge of thermal effluents are the effects of entrain-

          ment of fish in the discharge plume.
                  This form of entrainment had also been overlooked until recently,
                  but the available information suggests that the number of fish
                  fry that are entrained in this manner may be several times
                  greater than the number entrained at the cooling system intake
                  and passed through the plant. This is especially prevalent at
                  plants with high velocity discharges specifically designed to
                  lower the effluent temperature by rapid dilution of the effluent
                  with the cooler lake (receiving) water. Studies have not been
                  done to determine the fate of fry entrained in this manner at
<pb n="229" />

                                                    214

                       Great Lakes power plants, but mortality could occur from heat
                       shock, chlorine intoxication, predation, or from hydraulic
                       mauling received during entrainment. Various investigators
                       have found that one major effect of such sublethal exposure
                       of fish to elevated temperature is a reduction in the ability
                       of exposed fish to avoid predation [611; p.4591.

                       Impingement on the trash rack and mesh screens of the water intake struc-
               ture may also cause fish kills. Examples from studies on impingement problems
               in the Great Lakes include the following:
                       e About 92,000 pounds of gizzard shad at the Lambton plant on the
               St. Clair River in 6 weeks during December 1971-January 1972
                       o 82,187 pounds (nearly 1.1 million individuals) at the Detroit Edison
               Company's plant on Lake Erie near Monroe, Michigan between April 1972 and
               March 1973, when the plant was operating at less than maximum capacity
                       9 36,631 pounds (584,687 fish) at the Consumers Power Company's
               Palisades plant on Lake Michigan between July 1972 and June 1973, when the plant
               was operating at about 68 percent of its total capacity
                       * An estimated 1.2 million fish (no weight data given) at the Waukegan,
               Illinois plant on Lake Michigan between June 1972 and June 1973
                       * 150,000 pounds of fish at the Pickering Plant on Lake Ontario in
               April-June 1973

                         659.,000 fish (weight unavailable) at the Nine Mile Point plant gen-
               erating unit number one on Lake Ontario during intermittent sampling from
               January to December 1973, representing an estimated tot al of about 5 million fish
               at unit one for that period
                       o About 67,950 pounds (929,000 fish) at the Zion plant near Zion,
               Illinois, on Lake Michigan during September-December 1973 and March-June 1974,
               when the monthly cooling water flow averaged only about 45 percent of the maxi-
               mum capacity [611; p458].

                       Of course, the significance of the entrapment and impingement problem
               cannot be judged unless its effects are viewed relative to the Great Lakes
               Fishery as a whole.
                       Water used in a plant cooling system requires the addition of chemicals
               to prevent biological fouling and retard corrosion. Chemicals used include:
                       chromates, zinc, phosphates, and silicates for corrosion control;
                       chlorine, hypochlorite, chlorophenols, quaternary amines, and
                       organometallic compounds for bacterial growth control; acids and
                       alkalis for pH control necessary to prevent scale formation;
<pb n="230" />

                                                  215

                   lignintannins, polyacrylamides, polyethylene ami   nes, and other
                   polyelectrolytes to redu6e silt deposition [203; p.205].

          When released to the aquatic environment, these chemicals and/or their,reaction
          products can have toxic effects, especially on organisms-near the outfall.
          While discharges are normally kept below established toxicity levels, there may

          be adverse effects due to:

                   e Possible synergistic effects of the higher water temperatures in a
          cooling water discharge
                   o Possible synergistic and/or cumulative effects of other chemicals
          already present in the water and in the tissues of the organism

                      Presence of untested species or individuals more'sensitive to a par-

          ticular chemical than the tested individuals

                   9 Possible chronic and long-term sublethal effects that may not manifest
          themselves until later in the life cycle of the organism [203; p.205].

                   These effects may be more serious with closed-cycle systems because of

          the increased amounts of chemicals used and-the small amount of water available

          for dilution.

                                (ii) Natural draft cooling towers
                   The use of a natural draft tower creates potential adverse effects on
          the local meteorology through increased fogging (and icing during the winter
          months). However, this is less likely to be a problem than if mechanical draft

          towers are used.

                   Related to the problem of fogging is that of drift: water lost in droplet
          form by means of which salts are deposited over a wide area downwind from the
          tower. While drift rates are low (0.002 percent of the circulating flow rate for
          natural draft towers), these deposits may be detrimental to the biota and
          agriculture.
                   One concern related to the use of cooling towers at fossil fuel plants is
          the possibility of synergistic effects between the most vapor plume and the
          stack emissions. In particular, reactions with SO    2 in the stack gas could pro-
          ducea sulfuric acid mist. But studies have not indicated that this is a
          serious problem [2031.
                   Land requirements for a natural draft cooling tower are greater than for

            See section on Hydrology and Meteorology in description of Nuclear Power      Plants.
<pb n="231" />

                                                    216

              a once-through system but are less than that of the other closed-cycle systems.
                      The most obvi ous impact of a natural draft cooling tower is its presence
              in the surrounding landscape. Because they are up to 500 feet tall and 400 feet
              in diameter, it is difficult to make them unobtrusive. Of course, the degree of
              intrusion will depend on the character of the surrounding area and the way in
              which people view the two in juxtaposition.
                      Finally, natural draft towers could have adverse effects on migratory
              birds if located in a major flyway [614].

                                  (iii) Mechanical draft,cooling towers
                      The potential for fogging and icing problems is much greater with mech-

              anical draft towers than with natural draft towers. This is because the mechani-

              cal towers are much lower (60 feet versus 500 feet), making inversion penetra-
              tion less likely. Also, the plume is less concentrated and cools faster than
              the larger natural draft plume. The potential for drift problems is somewhat
              higher as 0.005 percent of the circulating flow is lost in this form [203].
                      Land requirements are somewhat higher than for natural draft towers due

              to the need for multiple units and spacing between them to prevent recirculation.
                      Because-of their low profiles, mechanical draft towers themselves do not
              present the aesthetic problems associated with natural draft units. However,
              the increased propensity for fogging and icing could cause significant visual
              impacts. Also, noise caused by the fans can be an important problem during

              operation.

                                  (iv) Cooling ponds
                      Occasional fogging and icing,problems may be associated with the use of
              cooling ponds, although not to the extent of cooling towers. There are no drift
              problems.
                      The major problem associated with the use of cooling ponds in the large
              land requirement: greater than 1,000 acres for the size of facility considered
              here. Creation of a water surface this large may require the impoundment on a
              river, which could have significant natural and cultural impacts.

                See Land Requirements in the Fossil Fuel Power Plant description.
<pb n="232" />

                                               217

                              (v) Spray Canals
                 The potential for fogging and icing problems is somewhat higher for
         Spray canals than for cooling poinds, although it may be more localized than

         that of mechanical draft towers. Also, while there may be some drift produced,
         it is ejected at such a low altitude (10-15 feet) that it would most.likely not
         be a problem outside of the plant site.
                 Land area requirements for a spray canal system are larger than that for
         a cooling tower of either type but much smaller than that for a cooling pond.

                             (vi) Summary of cooling system impacts
                 The above discussion has touched only briefly on the problems related to
         cooling system operation, especially With respect to the impacts on the aquatic
         environment. While the discussion of these impacts was included.in the section
         on once-through cooling, it is important to remember that all cooling systems
         will affect the source and receiving waters to some degree.

                         (c) Waste handling and storage

                 As discussed in the facility description section, a coal-fired power
         plant requires approximately 100,acres for ash disposal over its operational
         lifetime. The impacts associated with the handling and storage of t hese waste
         materials are primarily related to the release of potentially degrading and

         toxic materials to the environment and the disruption of human and natural

         systems.
                 As discussed in the plant operation section, toxic materials present in
         the fuel tend to become concentrated in the ash. These substances (primarily
         heavy metals and radioactive isotopes) find their way into the environment by
         several pathways: particulate material blown off the waste piles, dissolved and
         suspended fine particulates in the ash sluic ng water, leachates and,runoff from
         the storage area into the ground and surface waters.
                 The movement of waste material between the boiler and the disposal site
         may have an impact on traffic movement around the facility if the two sites are
         physically separated. Also, the presence of the disposal area could have aes-
         thetic impacts if it is visible from off-site locations. Finally, the ash dis-
         posal area will displace the natural biota of the site.
<pb n="233" />

                                                      218

                               (d) Transmission lines
                       The impacts of an Extra High Voltage (EHV-345 and 765 kV) transmission
              line arise primarily from two sources: disruption of the -natural and cultural
              environments by the presence of the right-of-way and its associated structures,
              and induced electric field effects caused by the flow of energy through the

              line.

                       The presence of a transmission line right-of-way can cause several
              changes  in the local natural environment. The clearing and subsequent revegeta-
              tion of  the right-of-way create a new habitat, leading to increased species
              diversity. At the same time, however, the application of herbicides as a part
              of the  right-of-@-way maintenance procedure may have detrimental effects on both

              the terrestrial and aquatic ecosystems, if proper application procedures are not
              followed. Also, piles of slash left along the right-of-way may provide breeding
              grounds for harmful insects and plant pathogens.
                       Crossing of property lines by the right-of-way may result in fractiona-
              tion of property and disruption of certain activities, such as agriculture.
              This will not be a significant problem if less than fee-simple ownership of the
              right-of-way (i.e., an easement) is acquired, since the actual structures require
              littl6area and the owner would be able to keep most of the land in its former

              use.

                       A right-of-way may also provide an access route into or through an area
              where none had existed previously. This may have a positive or negative effect,
              depending on whether or not such access is desirable.
                       One of the major problems associated with transmission lines is that
              they can be aesthetically disruptive. This is especially a problem in cases
              where the right-of-way crosses a high-visibility area, such as a hilltop or a

              scenic vista. It can also create aesthetic, and sometimes physical, disruption
              when it crosses a recreation area.' The degree of disruption will vary from case-
              to-case and should be evaluated carefully in site selection and/or approval

              decision.

                       The second class of effects associated wi.th ERV transmission lines is

              that related to the electric field generated by the flow of energy through the-
              lines. Available environmental reports prepared by     the utilities [378 and 608]
              indicate that these effects are limited and not'significant, although there.is
              some controversy regarding this point [6021.
<pb n="234" />

                      GROUND CLZABMSG AND RESHAPING
                      coaumm USE
                      CHAMOELIZATION, siiomxjm mmn=&amp;Ti.
                        AM OTM N&amp;TER-REATED ACTIVITIZO'
                      MATERIAL MOVEMM TO SITE
                      INFLUX OF TEMPORARY WORK FORCE
                      PUBLIC SERVICE REQUIRTIOM
                      LAO COMKITTED TO FACILITY
                      OTM

                                LEACEATES AND RmXw
                                         "N.SJUN
                                BMW ACTIVITY DISRUPTION
                                EQUIPMENT USE

                                V&amp;STVATER DISCHASCE
                                PARTICULAIES
                                SO.
                                BOX
                                MUMAK SERVICE REQUIRES111173'
                                ACCID30TS

                                TKERHAT. EFFLUENT
                                CHEMICAL ADDITIONS
                                SLOWDOWN WATER
                                mum-up WATER RE(rimmmmi
                                FOG/ICING/DRIFT
                                ENTRAPMENVINPINGS14M
                                VISUAL INTRUSION

                                LEACHATES AND RUNDFF
                                -iARTICULITES
                                VISUAL INTRUSION
                                ED" ACTIVITY DISRUPTION
                                NATURAL SYSTEM DISR117`2200

                                VISUAL INTRUSION
                                MUMAN ACTIVITY DISRUPTION
                                NATURAL SYSTEM =52UPTION
                                ELECTRIC FIELD EFFEM
<pb n="235" />

                                                  219

                   Because EHV transmission lines use air as an insulator, there is a con-
           stant discharge to the atmosphere, termed "corona discharge." The magnitude of
           this discharge depends primarily on the size and spacing of the conductors and
           ambient weather conditions,.especially humidity. Proper design can reduce the
           problems caused by corona discharge, but cannot eliminate them.
                   There are four potential problems related to the effects of corona dis-
           charge: audible noise (AN), television and radio interference (TVI and RI, res-
          .pectively), ozone production, and electrostatic induction.
                   Generally, these problems are worse during wet or humid weather. Right-
           of-way selection and line design should be carried out in such a way as to mini-

           mize these effects.

                   Figure 17 summarizes the impact vectors and.environments potentially

           affected by the construction and operation of a fossil-fuel power plant..

                       (2) Nuclear Power Plants
                   The types of impacts and general environments affected by the operation
           of a nuclear power plant are shown in Figure 18. This discussion will concen-
           trate on impacts related to reactor operation, specifically sources of radio-

           nuclide release to the environment'. It will also touch briefly on human service
           requirements, and. accidents. Impacts related to cooling system operation and
           electricity transmission have been covered adequately in the previous section
           and will not be repeated here.
                   The principal sources of radioactive materials are the fission
                   products which are produced in the fuel elements as a by-
                   product of normal operation. The quantity formed is small in
                   terms of mass, amounting to a few kilograms per day in a large
                   power plant. Under normal operation, more than 99 percent of
                   fission products remain in the reactor core where they were
                   formed. Small quantities which leak from the fuel elements,
                   however, are ultimately released from the plant radioactive
                   waste processing system to the environment. In addi   *tion to
                   the fission products, other sources of radioactivity are
                   leakage of radioactive materials from control rods, activation
                   of impurities in the reactor coolant, activation of corrosion
                   products from structural materials, and tramp uranium which
                   adheres to the outside of the fuel rods during the manufac-
                   turing process [203; p.23].

                   There are four types of radioactive waste materials (radwastes) that
           must be dealt with: gaseous, liquid, ventilation exhaust air, and solids. All
           four are produced by both reactor types now  in use: the boiling water reactor
<pb n="236" />

                                                                                                                  220

                                                                                                          FIGURE 18

                                                                                           DIAGRAMATIC SUMMARY OF

                                                                       NUCLEAR POWER PLANT ENVIRONMENTAL IMPACTS

                                                                                                                                                      Gd4

                                                                                                                                 Ailh.di .... fid-

                                                                                           Fuel.                                 Light Walat
                                                                                           Fabmaawn                              Reactor

                                                                                                                          L

                                                                                                                                 Spent
                                                                                                                                 Fuel
                                                                                                                                 Storage

                                                                                                                                 W.w/ai ... J-d-I.d.

                                                                                                               K

                                                             Spew Fuel                                      ralisportation
                                                             plocessisig                                   of Wastes

                                                                          Ah/1-1

                                                                                                                          Aldf-k

                                                                                                  Wet                        My                       Once
                                                                           C-lutt;                Cooling                   Coolini.,                 Tluouulk
                                                                           p ... id               To-                       T-w                       Cooling
                                                                                                                                                    Ij
                                                                                                   Ln-ddi ... 1-4 ..1 @-j

                                                                                                                                                      W-dd-W-d ..bj.

                                                                                               L-J@-f- -p        .......

                                                                   A'A .1 .,w m....'W@w ."id4m.
                                                                                             @WTC--"

                                                                                                                                                                           [Source               501]
<pb n="237" />

                                                 221

          and pressurized water reactor. However, the mix of these wastes varies with
          reactor type, BWR's producing more gaseous radwaste (radgas) and PWRIs producing
          higher levels of liquid radwaste.

                           (a) Boiling water reactor wastes
                  The principal source of radgas in both reactor types is the degassing
          ofthe primary coolant. Much of this gas is a result of air inleakage at the
          condenser. In a BWR, additional gaseous wastes are generated by fission and
          activation products and radiolytic decomposition products (hydrogen and oxygen).
          Also, radgas emissions may arise from leakages around the turbine gland seals,
          especially in older plants (new plants having eliminated this waste source).
                  Most of these gaseous wastes are removed at the turbine condenser through
          an air ejector. These effluents contain nitrogen-13 (an activation product),
          noble gas isotopes, krypton and xenon (fission products), halogens (mostly
          iodine), and tritium. In addition, there are some radioactive particulates and

          solid decay products associated with the gaseous wastes.
                  Treatment consists primarily of delay (30-60 minutes) to allow the short-
          lived isotopes to decay and filtration through high efficiency particulate (HEPA)
          filters prior to venting through the station's stack [203 and 546]. Alterna-
          tively, cryogenic distillation may be used to liquify and remove the noble gas
          fission products [5461. A charcoal absorber system can also be used to provide
          up to 10 hours of delay to reduce the amount of xenon and krypton, the two
          principal radioactive species. -Figure 19 shows a simplified radgas control sys-
          tem schematic while Table 27summarizes the principal isotope emissions based on

          varying delay times.
                  There are four major types of liquid radwastes from a nuclear power
          facility of either type: high purity wastes, which are radioactive but low in
          normal chemical impurities (e.g., primary coolant leaks and equipment drains);
          low purity wastes with varying levels of radioactivity, such as floor drains;
          chemical wastes; and detergent wastes with low levels of radioactivity [203 and
          5461. "These waste streams are segregated according to origin so that liquids
          of near coolant quality may be treated and reused..." [546; p-167]. Following
          treatment, the liquid waste discharges are then, bled into the cooling water
          discharge flow at such a rate to meet government emission standards. Figure 20-
          and Table-27 show a typical BWR liquid radwaste treatment system,and effluent

          activity levels, respectively.
<pb n="238" />

                                                             FIGURE 19

                                                       BWR RADGAS CONTROL SYSTEK

                                                                                                                  S
                                                                                                                  T
                                                                                                                  A
                                                                                                                  C
                                                                                                                  K

                                         GLAND          FROM SECONDARY VENTILATION AND
                                          SEAL          VACUUM PUMP DISCHARGE
                                        LEAKAGE
                                        HOLD-UP

                STEAM FROM'
                REACTOR
                                                                                                               V
                                                                                                               E
                         URBINE                                                                                N
                                                                                                               T_
                CONDENSATE        CONDENSER                  RECOMBINER
                RETURN TO                           AIR                  CONDENSER
                REACTOR                          EJECTOR                  OFF GAS
                                                                           HOLD-UP
                                                                                  1A ------- IL
                                                                                  ;CHARCOAL,
                                                                                  I BEDS I
                    P- ROUGHING FILTER                                                  OR    I
                    C- CHARCOAL AOSORBER                                           CRYOG EN IC!
                                                                                      STILL
                    A- HEPA FILTER

                                                                                                               [Source   2031
                                                                                                 p
                       @R
                        1@E
<pb n="239" />

                                                  223

                                              TABLE 27

                     ANNUAL LIQUID EFFLUENT ACTIVITY FOR A 1000 MWe REACTOR

                                                           .(Curies/year)

                             Principle Isotopes        BWR.      PWR

                            Rb-88                                0.39
                            Sr-89                      0.64
                            Y-90                       0.14
                            Y-91                       0.31
                            1-131                      1.71      0.47
                            Te-132                               0.96
                            1-133                      0.20      0.11
                            Cs-134                     0.36      0.41
                            Cs-136                               0.20
                            Cs-137                     0.27      0.28
                            Cs-138                               0.27
                            Ba-140                     0.93
                            Ba-137m                              0.26
                            La-140                     0.71
                            Fe-55                      0.26
                            Co-58                      0.60      0.33
                            Mn-56                                0.84
                            Other liquid activity      1.0       .0.78

                               Total(excluding         7.1       5.3
                                      tritium)

                            Tritium                    20.0      350

                                                                  [Source   203]

                  Solid radwastes are similar for both BWR's and PWR's, consisting of
         three general types: wet, such as spent resins and evaporator concentrates;       dry
         compressible, such as rags, clothing, and plastic; and dry noncompressible,       such
         as equipment [546]. The wet wastes are solidified and kept on-site for a period
         to permit the decay of short-lived radionuclides. Ultimate disposal for all
         forms is burial at an approved site. It is estimated that total.solid waste
         activity from a 1000-MWe reactor amounts to     2,500-5,000 curies per year [2031.

            See Table 21 for definition.
<pb n="240" />

                                                                   224

                                                               FIGURE    20

                                                       BWR LIQUID WASTE SYSTEM

                                                                                        CONDENSATE      RECYCLE
                                                                                           STORAGE

                               FROM
                               EQUIPMENT       COLLECTOR                                   WASTE
                               DRAINS           FOR HIGH --pFILTER          DEMIN-         SAMPLE
                                                  PURITY                    ERALIZER       TANK
                                                  WASTE

                                                                                              S

                               FROM            FIL OR DRAIN
                               PLANT              WASTE                     DEMIN-         SAMPLE
                               FLOOR           COLLECTOR   7r FILTER                       TANKS
                               DRAINS                                       ERALIZER

                                                                                              s

                                                                              s

                                                CHEMICAL
                               FROM LAB           WASTE                       EVAPO-       CONDENSATE
                               DRAINS AND--' COLLECTOR-                       RATOR           TANK
                               DECON-          NEUTRALIZER
                               TAMINANTS

                                                                                S

                               FROM             LAUNDRY
                               LAUNDRY@       (DETERGENT)     FI LT ER                           R
                               DRAINS          DRAIN TANKS

                                                                                               DISCHARGE
                                                    s                                          CANAL

                                      S   SAMPLING POINT

                                          SOLID-WASTE TO   PAC  KAGING                     S

                                          ADDED FOR MAX    RECYCLE

                                      R   RADIOACTIVITY MONITOR

                                                                                                 [Source      2031
                                                                                       @CONDENSATE
                                                                                           STORAGE

                                                                            DPEMIN @:LE
                                                                              LIZ
                                                                                                .S
                                                                         t ;ERA   ER
<pb n="241" />

                                                  225

                            (b) Pressurized waterreactor wastes

                   The major source of PWR radgas is in the primary coolant system, although
          r1radioactive gases will exhaust from the main condenser air ejector when steam
          generator leakage from primary to secondary system occurs" [546; p.190].
                   During operation of PWR, radioactive materials released to the
                   atmosphere in gaseous effluents are similar to those released
                   from a BWR and include low concentrations of the fission product
                   noble gases (krypton and xenon), halogens (mostly iodines), and
                   tritium contained in water vapor and particulate material [203; p.26].

          However, the activity levels of these emissions is typically much lower for a
          PWR, due to the considerably larger delay prior to release (45-60 days); see
          Table 28.   A schematic of a PWR radgas control system is shown in Figure 21.
                   As Table 28 indicates, liquid radwastes are similar for both PWR and
          BWR plants  with the exception of tritium. This greater than tenfold difference

          in tritium emissions arises

                   primarily from the use of boron soluble poison in the PWR
                   coolant for supplementary control. Boron undergoes a
                   neutron capture reaction to generate tritium which has a
                   relatively long half-life (12.3 years). Since tritiated
                   water is chemically identifical with ordinary water,
                   separation is very difficult and to date impractical. The
                   lower tritium releases in later model PWR's have been largely
                   achieved by water management schemes which store more of the
                   tritium in the plant water inventory [203; p.34].

                   As discussed above, PWR solid radwastes are similar to those from a BWR
          facility.

                           (c) Environmental impacts of emissions

                   Figure 22 shows the major pathways of radiation-through the environment
          and ultimately to the human population. Under normal operating conditions, all
          nuclear plants (and, as discussed earlier, most fossil fuel plants) emit traces
          of radioactive substances to the environment in both liquid and gaseous form.

          Concern with the effects of these emissions, especially over the long term, is

          one of the major points of controversy in the nuclear power debate. The brief
          discussion below cannot answer any of these questions (nor can any other docu-
          ment) but it will highlight some of the issues.

            Radioactive solids (except for fine particulates that may pass through the
          HEPA filters) are not considered to be an emission for the purposes of this
          report, although their handling and disposal (storage) do present significant
          problems.
<pb n="242" />

                                                             226

                                                         TABLE 28

                                           ESTIMATED ANNUAL RADGAS EFFLUENTS

                                                  FROM A 1000-MWe REACTOR
                                                               Release Rate, curie0yearl/

                                                                  2/
                          Nuclide    Half-Life     30 min. delay.:-,    1 day d layll      60 day delayl/
                          83mKr       1.86 hr..          90,000                13                 0
                           85Kr      10.76 yr.              250                250               250
                          85mKr       4.4 hr.          160,000               3,900                0

                           87
                               Kr     1.3 hr.          480,000                   1.5              0
                           88Kr       2.8 hr.          510,000               1,500                0
                           89Kr       3.2 min.           11,000                  0                0

                        Total Kr activity           1,250,000                5,650               250
                                                    (approx.)

                                                                       15 day de
                          131mXe     11.9 day               375                150                10
                           133Xe      5.27 day         1601000              22,000                50
                          133mXe      2.3 day             6,000                50                 0
                           135Xe      9.2   hr.        540,000                   0                0
                          135mx,     15.6   min.       260,000                   0                0
                           137Xe      3.8   min.         281000                  0                0
                           138xe     14     min.       780,000                   0                0

                        Total le    activity        1,800,000               22,200                66
                                                    (approx.j

                        l/   Assumes operation with 0.2% clad defects.
                        2/   Typical holdup time in BWR's built to date.
                             Typical holdup times for BWR's using charcoal beds.
                             Typical holdup times in PWR's are between 45 and 60 days and
                             accordingly would be between the 1 and 60 day values.

                           A curie is a measure of radioactivity, specifically "a quantity of
                           any radioactive nuclide in which 3.7 x 1010 disintegrations occur per
                           second" (Webster's New Collegiate Dictionary)
                                                                                             [Source - 2031
<pb n="243" />

                                                                    FIGURE    21

                                                            PWR RADGAS CONTROL SYSTEM

                                                     RECYCLE TO PRIM.
                                                     COOLANT SYSTEM

                       PRIMARY COOLANT
                       SYSTEM OFF-GAS                    DECAY TANK
                      ,11EADER
                                                                                    P C A
                          COMPRESSOR                                       ORIFI  CE
                                         SURGE
                                          TANK

                                                           STEAM
                                                                     TURBINE
                      p

                                                          CONDENSA E                            CONDENSER
                   AIR SUPPLY      PRIMARY -&gt;
                                   COOLANT                              CONDENSER      Al
                                                                                     EJECTOR

                                     STEAM
                                   GENERATOR

                                                                                                                              z
                                                                    BLOWDOWN                                                  LLj
                                   L                                FLASH TANK                                                &gt;
                                                                    DRAIN TO WAST E SYSTEM    FT
                                                            CONTAINMENT BUILDING    RU R G E
                                 CONTAINMENT BUILDING

                      P-ROuGHING FILTER
                      C-CHARCCAL ADSORSER
                      A-HEPA FILTER

                                                                                                                  [Source     2031
                                        R                                              AIR
                                                                  L@CO@N                CT
                                       4;ANYT                               DENS@ER
                                                                                     E@JEO@R
                                        AM@
                                                         7@F
                                                                    D
<pb n="244" />

                                                                                  228

                                                                         FIGURE 22

                                           PATIMAYS OF RADIATION THROUGH THE ENVIRONMENT

                                                                                                                                  Dairy
                    Crit;c-@l                                                     Pasturage                  Animals
                    Pathway for                                                                                                   Products

                                       Dischare,e of
                                       Radionuclides            Air             b Crops                  P- Farm
                                       In Gaseous                                                            Products
                                       Effluents

                      Nucliear                                                    Fish &amp;                     Fish &amp; Shellfish              Human
                      Reactor                                                     Shellfish                  Processing                    Population

                                                                                                             Pecreational
                                       Discharge of                               Surface                    Exposure
                                       Radionuclides            Surface           Water                      Edible
                                       In Liquid                Water                                        Waterfowl
                                       Effluents                                  supply
                                                                                  Ground
                                                                Ground            Water                      Drinking
                                                                Water                                        Water
                                                                                  Supply

                                                                                                                [Source         4511

                                        No radioactive materials normally emitted by a nuclear power facility
                      must exceed standards administered by the NRC. At present, the regulations
                      (10 CFR 50 Appendix I) specify that air emissions cannot exceed one percent of
                      the normal background level of activity.                            Furthermore, the maximum annual whole
                      body dose to an unprotected individual is restricted to15 millirems.

                                  * Estimated annual total quantity of radioactive material, except

                      tritium, should not exceed 5 curies.

                                  * Estimated annual average concentration of radioactive material prior
                      to dilution in a natural body of water, except tritium, should not exceed
                               -5 .
                      2 x 10        microcuries per liter.

                                  * Estimated annual average concentrations of tritium prior to dilution
                      in a natural body of water should not exceed 5 x 10-                               3   microcuries per liter.
                                                                       A
                                                                      Z
                                                                    J     'I'll
                                                                    A / / //j/1
                                                                                                                       n /a@@

                         On a similar basis, S02 and N02 emission standards are 10,000 percent and 400
                      percent of natural background levels.

                           A measure of radiation dosage. For comparative purposes, the average dose
                      per year from natural background sources is 135 millirems.
<pb n="245" />

                                                   229

                   0   Radioactive material above background must not result in an exposure
           rate such that a hypothetical individual, continuously present in the open at
           the site boundary, incurs an annual exposure to the whole body or any organ in
           excess of 5millirems [203; p.155].

                   A major factor in calculating the effective dose rate from airborne
           radioactive material is the dispersion pattern upon release from the stack.
           Estimated maximum individual doses are shown in Table 29, based on a person re-
           siding permanently at the plant site boundary closest to the plant. Doses for
           individuals further from the plant would be lower, the amount dependent on wind

           patterns and other dispersion factors.

                                               TABLE 29

                                  MAXIMUM ESTIMATED WHOLE BODY DOSE

                                AT SITE BOUNDARY FOR A 1000 MWe PLANT

                                              Dose Rate (millirem/year)
                                                              BWR
                        Holdup Time              300 ft. Stack      Roof Vent.
                          (days)         P WR_    Discharge          Discharge

                          0              40
                         30  (min.)                    500
                                                          8             420
                          3                               2             110
                          9                            0.8                45
                         15              4.5
                         25                            0.1               6
                         30              0.9
                         45**            0.45          0.01             0.7
                         60,             0.36          0.005            0.3
                         90              0.34

                                Typical design hold-up time for BWR's currently
                                coming into service
                                Typical design hold-up time for PWR's currently
                                coming into service
<pb n="246" />

                                                   230

                     As Figure 22 indicates, direct whole body exposure is not the only route
             to human (and other natural system component) contamination. For example,
             iodine-131 is passed to man via an air-pasture-animal-dairy product pathway.
             Once consumed, it concentrates in the thyroid gland. Knowledge of this and
             other pathways of airborne emissions is incomplete and worthy of considerable
             future research. The problem has been summarized:
                     Thetrue impact on the population of these very low doses from
                     nuclear power stations has not been accurately quantified to
                     date. The difficulty arises from the enormous amount of'data
                     which would be required to detect a statistically significant
                     effect from incremental doses that are only a few percent above
                     the normal background radiation exposure. Even if one accepts
                     the "linear 'dose theory," which implies that damage is'propor-
                     tional to dose down to essentially zero exposure, with no thresh-
                     old, the evidence suggests that the additional impacts are small
                     indeed [203; p.153].

                     The pathways of radioactive materials released to the aquatic environ-
             ment have been succinctly described in material presented in reference 603:
                     Upon introduction into an aquatic environment, radioactive wastes
                     can: (1) remain in solution or in suspension; (2) precipitate and
                     settle to the bottom; or (3) be taken up by plants and animals.
                     Immediately upon introduction of radioactive materials into the
                     water, certain factors interact to dilute and disperse these
                     materials, while simultaneously other factors tend to concentrate
                     the radioactivity. Among those factors that dilute and disperse
                     radioactivity are currents, turbulent diffusion, isotopic dilu-
                     tion, and biological transport. Radioactivity is concentrated
                     biologically by uptake directly from the water and passage
                     through food webs, chemically and physically by adsorption, ion
                     exchange, coprecipitation, flocculation, and sedimentation.

                     Radioactive wastes in the aquatic environment may be cycled
                     through water, sediment, and the biota. Each radionuclide
                     tends to take a characteristic route and has its own rate of
                     movement from component to component prior to coming to rest
                     in a temporary reservoir, one of the three components of the
                     ecosystems. Isotopes can move from the water to the sediments
                     or to the biota. In effect, the sediments and biota compete
                     for the isotopes in the water. Even though in some instances,
                     sediments are initially successful in removing large quantities
                     of radionuclides from water, and thus, preventing their
                     immediate uptake by the biota, this sediment-associated radio-
                     activity may later affect many benthic species by exposing them
                     to radiation. Also, any radioactivity leached'from the sedi-
                     ments back to the water again becomes available for uptake
                     by the biota. Even before the radioactivity is leached from
                     the sediment, it may become available to the biota due to a
                     variation in the strength of the bonds between the different
<pb n="247" />

                                                231

                  radionuclides and the sediment particles. Loosely bound
                  radionuclides can be 'stripped' from particles of sediment
                  and utilized by bottom feeding organisms.

                  Plants and animals, to be of any significance in the cycling
                  of radionuclides in the aquatic environment, must accumulate
                  the radionuclide, retain it, be eaten by another organism,
                  and be digestible. However, even if an organism accumulates
                .and retains a radionuclide and is not eaten before it dies,
                  the radionuclide will enter the "biological cycle" through
                  organisms that decompose the dead organic material into its
                  elemental components. Plants and animals that become radio-
                  active in this biological cycle can pose a health hazard when
                  eaten by man.

                  Aquatic life may receive radiation from radionuclides present
                  in the water and substrate and also from radionuclides that
                  may accumulate within their tissues. Humans can acquire radio-
                  nuclides via many pathways, but among the most important are
                  drinking water or edible fish and shellfish that have concen-
                  trated nuclides from the water. In order to prevent unaccept-
                  able doses of radiation from reaching humans, fish, and other
                  important organisms, the concentrations of radionuclides in
                  water, both fresh and marine, must be restricted [603].

                  As indicated above, the levels of exposure are too close to background
         levels to be assessed aasily, "although all indications.are that the effect
         is vanishingly small" [203; p.155].
                  As indicated in Table 18 in the discussion on construction impacts, the
         operating work force requirements for a major nuclear power facility are rela-
         tively small, ranging from 77-200 at the proposed plants listed. Other sources
         indicate that a single unit facility with a capacity of 750-1000 MWe will have
         less than 100 full-time employees, while a plant with two.units "will have much
         less than double" that number of employees [451]. Based on this, it would seem
         that the long-term socioeconomic impacts of immigration would be on par or
         slightly less than those of a similar capacity fossil fuel plant.
                  A potential impact "unique to nuclear power plants evolves from per-
         ceived danger of radiation" [601; p.2]. This concern would be articulated via

         local opposition to the construction of a facility and tension during the
         operational phase. In a study of this problem in the Northeast, researchers

         from Oak Ridge National Laboratory found that:
                  Residents, in general, are unconcerned about the nuclear plant
                  in their community unless it has an accident or radioactive
                  spill.
<pb n="248" />

                                                       232

                        intervenors [opposition leaders] in both communities are few;
                        those who do intervene or are vocal about nuclear power face
                        opposition from the majority of local residents.

                        Communities appear to adopt an "out of sight, out of mind"
                        attitude toward the facility [600; pp.11-12].

                While these results apply only to the specific communities involved and should
                not be generalized, they do at least provide an indication of what local senti-
                ment might be. Opinion research studies in the area of a proposed facility
                should be a part of the evaluation procedure.

                        One of the most controversial issues related to    the future use of nuclear

                power plants is the potential for catastrophic accidents, core meltdowns with a
                release of primary coolant to the atmosphere.     The utilities and suppliers
                point to redundant emergency control systems, conservative engineering standards,
                and a nuclear safety record of hundreds of reactor-years of-operation without a
                major accident. Critics point out that much of that experience has been with

                low-power naval reactors and that several mishaps have pointed out flaws in
                design, construction, and operation. Finally, they make.the point that the
                magnitude of destruction associated with an accident presents risks too large
                to take, even if the probability is extremely,small. There is no answer to the
                controversy and it is not the purpose of this report to go beyond suggesting
                that the states should consider it as a part of an energy facility siting

                program.
                        The activity-impact evaluation matrix in Figure 23 summarizes the
                activities associated with the construction and operation of a nuclear power
                facility and the environments potentially affected by them.

                             (3) Coal Transshipment-Facilities
                        Impacts related specifically to the. operation and maintenance of coal
                transshipment facilities fall into the major categories of natural environment
                disruption and intrusion on cultural aesthetics. In addition to these negative
                impacts are thepositive effects on local and regional economy and employment
                and the value of the service performed by the facility when completed. Conse-
                quently, the natural/cultural division of environments provide a workable base

                  Other major issues include safe disposal of high-level wastes, protection
                against sabotage and terrorist activites (including stealing plutonium), and
                transport of hazardous materials.
<pb n="249" />

                                                                  232a

                                                           N A T 11 It A L
                                                                                                                                                               C U L T.U R A L
                                          hrYSICAL &amp; (JVKICAL CIMMTURISTICS BIMOGICAL (MITICHS         SOC I AL                                          Ecouomic
                                                                          TERRESTilli-Al. QVA-ric Ar.,Tltr.Tlt;S AMD rual.1c
                                         TERRE7TRIAl TIYF)Rnf.0rl(:Af. ATIVISMIER I C, Ecul,I)rT rx(ll.f*;y IRMO MEREST IMA1,111 rmAIMENT 11(41MC wRASIMIC-11M.F.       I.AM) VALUE
                                                  @u FACF ( (VIRT)                                                                                                  AIM 11111.111RAL C(NNVIVRCIA1. ItIMISPRIA1,
                                                  WATER  WA I l:K  It-Au'ry
                                                                                                                                                                      -----------
                                                                                                   ti  cl                                     @l  ri U

                                                                                                                                                13
                                                           8 3

           CRWND CLEARM AM RRSWVAr
           EQUIPMENT USE
           CRAHMIZATMN. SHOMnM HMtftCATMW,
            AM OTHER WATIR-RIMATED ACTIVITIES
           PaTilmi, MVMMT To SITE
           nrnm OF Tv"R"Y WRX FORCE
           maic SmvIcx z=uum=
           LAW COM17M TO MILITY

               RAD MaSSIONS
               WASTElaTER DISCRAWE
               Suw SEEVICT. mmumu4mm

           MEL AND WASTE HANDLI NG

               TmEDia Zn%mM
               CHEKIM AMT10113
               BLOWWWN MATE1
               MM-4u? WATER ffwammm
               FOG/T.CING/bRUT
               mnTAMMMT/nenCMUM
               VISUAL amsim

               VISUAL MMS1011
               HUMAN ACTIVITY DISRUPTION
               MMIAL SYSTEM DISRUPTION
    L          MECT IRIC Ill= E"ECTS                                         E-1 I

                                                                                                          FIGURE       23
                                                                                                    NUCLEAR POWER PLANTS
<pb n="250" />

                                                  233

           from which the specific impacts of a coal transshipment facility may be

           considered.

                            (a) Natural
                   Coal dust emissions and their associated effects are the most signifi-
           cant negative impacts related to the operation of coal handling and storage
           facilities. The two most important impacts of these coal dust emissions relate
           to the terrestrial and aquatic ecologies. Because of the presence in coal of
           trace elements such as cadmium, mercury, lead, and arsenic, problems may develop
           when these heavy metals are taken up from the soils and sediments by terrestrial
           and aquatic plants [391]. Ingestion of these plants by terrestrial and aquatic
           life introduces these trace elements to the food chain and in some cases, may
           reach toxic levels through a cumulative process.
                   Coal dust fallout may increase turbidity levels of surrounding water
           bodies as well. This may result in an overall decrease in the zone of photo-
           synthetic activity and, thus, reduce productivity [391].
                   Similar impacts result from runoff and leachates associated with coal
           stockpile drainage. In the case where large stockpiles of coal are maintained

           during the off-shipping season, large volumes of coal are exposed to snow and
           rain and subsequent runoff. In addition, liquid suppressants are sometimes
           used to wet down the coal piles to control dust, resulting in additional infil-
           tration of the pile by liquids.

                   The result of this drainage is two-fold. First, the surface runoff is
           capable of washing coal dust from the pile and carrying it into existing drainage
           canals or storm sewers, eventually introducing the dust to   the receiving water.
           body. The effects of this are explained above. Secondly,     the water which per-
           colates through the coal pile may take into solution those   trace elements men-
           tioned previously and introduce this resulting leachate to   the ground-water
           system. Because of the persistence of these heavy metals,    well water quality
           and even surface water quality may be impacted.
                   Harbor maintenance in the forra of dredging and disposal of these dredge
           spoils is particular to coal transshipment facilties and has a potentially
           significant impact on both water quality and aquatic and terrestrial ecology.

           Mechanical disruption and displacement of bottom sediments may result in
           increased turbidity and the release of gases and nutrients to the water column
           which were previously tied up in the bottom sediments.
<pb n="251" />

                                                 234

                   Noise from operation of heavy equipment such as rail traffic, stackers,
           conveyors, bulldozers, ship loaders, and ship machinery may have an impact on
           the wildlife community within the vicinity of the facility. This may result in

           both behavioral and physiological changes such as alterations in migratory
           patterns and sexual function [391].

                           (b) Cultural
                   Impacts of a coal transshipment facility on the cultural environment of
           the area result primarily from the physical presence of the facility and the
           activities associated with its operation.

                   From a social standpoint, the visual intrusions which result from the
           creation of large coal stockpiles approaching 50 feet in height may represent
           a serious alteration of the previous view. This aesthetic impact is difficult

           to quantify but may be reflected indirectly in public attitudes toward the
           facility and in changes of land value around the-facility. Other aesthetic
           impacts may result from high noise levels due to equipment use. Public health
           may be affected by a coal transshipment facility operation in two ways: noise
           levels due to equipment use may,occasionally exceed hearing damage levels re-
           sulting in hearing impairment in the vicinity of the facility; likewise; effects
           of coal dust on water quality (discussed in the previous section) may affect
           drinking water supplies, threatening water potability-  I
                   Economic impacts of a coal transshipment facility are reflected in
           long-term employment for operation, taxes on earnings, property taxes, and
           employment in associated rail and ship transport. These are all generally
           positive impacts, which are felt most strongly at the local level. The magni-
           tude of economic benefit will depend on the scope of the project. A new facility
           will create many more jobs than the expansion of an existing facility, but this
           number is still small by comparison with electric generating plant figures
           (see Table 21). Likewise, the extent of economic impact is highly dependent on
           the economic health of the area in question.
                   From a physical standpoint, changes in land use and recreational value
           may result in cases where the facilities are developed on previously nonindustrial
           sites. This is unlikely because most coal transshipment facilities have been
           developed at existing harbors and expansion of these facilties is generally con-
           tiguous to the existing facility. In the case of specific sites, such as
           Conneaut Harbor, Ohio, expansion of coal storage facilities may result in a
<pb n="252" />

                                                                                                                                                 FUEL TRANSSHIPMENT
                                                                                                                                              AND STORAGE FACILITIES                     CONSTRUCTION

                                                                                                                                                                                                                        Lli@a         FORMS

                                                                                                                                                                                                                        MYSICAL
                                                                                                                                                                                                                                      QUAL.

                                                                                                                                                                                                                        GuAlrily
                                                                                                                                                                                                                        1@liys!CAL
                                                                                                                                                                                                                        10=11CAL
                                                                                                                                                                                                                        LCCAL

                                                                                                                                                                                                                        .rcs          L

                                                                                                                                                                                                                                      -CAL

                                                                                                                                                                                                                                                       74
                                                                                                                                                                                                                        i-T"IM

                                                                                                                                                                                                                        @SEXTHIC

                                                                                                                                                                                                                        PLA.IK-101 C
                                                                                                                                                                                                                        !VTLI.;s &amp; VISTA$

                                                                                                                                                                                                                                      OEIIGNIS

                                                                                                                                                                                                                        ?AAM          JZZE-
                                                                                                                                                                                                                                        .1"Es
                                                                                                                                                                                                                        ,.,Rz %       L7;lrllt
                                                                                                                                                                                                                        ?EC           ECSYST-M
                                                                                                                                                                                                                                      ICAL Ca
                                                                                                                                                                                                                                      "Gicu. srm
                                                                                                                                                                                                                        112131MIT MISE       LZVELS;
                                                                                                                     C/)                                                                                                              @;A Z..t
                                                                                                       NJ                                                                                                                             ITT
                                                                                                       4-            b__4                                                                                               11
                                                                                                                     73

                                                                                                                     m                                                                                                  SHORT TIM

                                                                                                                                                                                                                        LONG TER.X

                                                                                                                                                                                                                        SKORT --M.

                                                                                                                                                                                                                        LDN'G rEm
                                                                                                                                                                                                                        TX.LliSp?j'MATlOy
                                                                                                                                                                                                                                      :)ISPOSAL

                                                                                                                                                                                                                        zArsTy @ERVICES

                                                                                                                                                                                                                        IMMOTE

                                                                                                                                                                                                                        ADJACMW

                                                                                                                                                                                                                        1.,ACEIM

                                                                                                                                                                                                                        IFISCAL ul-CTS
                                                                                                                                                                                                                        I.USM:EsS ACTIVE-

                                                                                                                                                                                                                        FORESTS
                                                                                                                                                                                                                        JGRAZ

                                                                                                                                                                                                                        Comftz-aczAL
                                                                                                                                                                                                                        -_NDcSnlAL
                                                                                                                                                                                                                                      "as

                                                                                                                                                                                                                                      G

                                                                                                                                                                                                                                      -----------
                                                                                                                                    HT-
<pb n="253" />

                                                235

          change of land use due to the rural nature of the area. In these cases, the
          impact of committing undeveloped open lands to a single use (coal storage) is
          significant especially in the coastal zone where land utilization and public

          access are important questions.
                  Finally, community disruption in the form of traffic flow alterations
          and tie-ups is a potentially significant impact of a coal transshipment
          facility. In the case of the coal facility at Superior Harbor, Wisconsin [3911,
          major consideration was given to the effects,of unit train operation in and

          about the facility and how it would be reflected in traffic disruption. These
          effects include increased necessity.for traffic rerouting, construction of
          bridges and bypasses, and expansion of existing roads or railways. A graphic

          summary of activities and environments assembled in the form of a matrix, which
          may be used for amore specified case analysis, is provided in Figure 24.

                      (4) Oil Transshipment and Storage
                  Operation and maintenance impacts associated with oil transshipment and

          storage facilities include the effects on the natural environment of oil spills

          and hydrocarbon emissions and effects on the cultural environment in terms of

          aesthetics and safety.

                          (a) Natural

                  The most significant and specific impacts of an oil transshipment and
          storage facility on the natural environment are those associated with hydrocarbon

          emissions and potential leaks and spills of oil. Hydrocarbon emissions escaping
          during both storage and loading processes. adversely affect air quality by re-
          ducing visibility in contributing to a photochemical smog effect [158] and by
          adding significantly to the ambient odors. Also, as discussed in the facilities

          description section, refined products transshipment is most common on the Great

          Lakes and it is these petroleum products whose aromatic hydrocarbons are most
          toxic [292].
                  Effects of oil leaks and spills on the natural environment range from
          adverse impacts on water quality to health effects on wildlife. Figure 25 shows
          the manner in which an oil spill may be taken in the aquatic environment. In the
          case of transshipment facilities on the Great Lakes, these spills will most
          likely occur at or near the water's edge. Depending on the viscosity of the
          spilled oil, impacts on the land range from few for high viscosity products
<pb n="254" />

                                                                                                        Ni'MOSPHERE

                                                                                 P110to-oxidDlion
                                                                                'Ile
                                                                        evaporation          t            rain and         ingestion by, and surface                        pFoto-oxidation               LITTORALZONE
                                                                                                          fall-out        coating on birds and rnammals
                                                                                   o,@rnsolization                                                                           evaporation

                                                                                         SURFACE SL(CK                                                                                   BEACHED OIL
                                                                                         1,  microbial oxidation                                                                         1. photo-oxiclation
                                                                                         2.  photo-oxidatioA                      - littoral deposition                                  2. microbial oxidation                         C01      H20
                                OIL S                         $pill ---------   40.      3.  polymerization                        -4                refloating                          3. physical accumulation of
                                                                                         4.  flushing                                                                                       inert products   i("pavement")
                                                                                         5.  einulsifi@ation (water-in-oil)                                                              4. physical removal by clean-up
                                                                                         6.  physical removal by                                                                            crows. birds. animals and
                                                                                             clean-up crews.                                                                                unwary beachcombers
                      WATER COLUMN
                                                                                                                                               dissolution                                                                ingestion

                                                                        1. sinking of   non-buovant                ingavion                                                   thr  ugh substratum                   I
                                                                           residues                                                                                                                           smott I
                                       emulsiheation                    2. silt-sedimentation                                                  emulsificazion
                                         o                                                                                                                                                                                                       NO
                                           il-in-viater)

                                                                                                               PLANKTON                                orgaruc uptake                           INTERTIDAL ORGANI
                                           di-.%olution                                                                                                of oil dissolved                                                         SIVIS
                                                                                                                 NEKTON                                or emulsified in
                                                                                                                                                       Water
                                                    bubble transport                       ingestic
                                                    and upwolling

                                                                                                          bioaccumulation through
                                                                                                                   ingestion

                                                                                        smotherirg

                                           SEDIMENTED OIL                     incgestion       BENTHIC ORGANISMS
                      C02     H20--l. microbialoxidation
                                           2. physical accumulation
                                              of inert residues.
                                           3. chemical oxidation
                                                                                                                                                                                  SUBLITTORAL ZONE
                                           UM

                                                                                                                                                                                 0

                                                                                                                                                                                               @t @TERT
                                                                                                                                                                                       jE

                                               )h
                                               @f

                                                                                                                                                           FIGURE 25

                                                                                                                                                           FATE OF OIL IN THE MARINE ENVIRONME,4T
                                                                                                                                                                                                                           (2921
<pb n="255" />

                                                237

         to significant for low viscosity products (such as gasoline), which are more
         difficult to recover [158]. Impacts on water quality are intensified by the
         high solubility of refined prducts and the subsequent toxic impacts on aquatic
         ecology. In the cases where oil products are emulsified in the water column,
         threats to drinking water derived from wells may result.
                 Impacts on biota include toxicity of volatile hydrocarbons and smothering
         by the heavier fractions of refined products. Effects of oil spills are felt
         most severely in nearshore areas, and shoreline communities are thought to suffer
         pronounced detrimental effects [158]. Benthic organisms, aquatic vegetation,
         and sea and shorebirds are all significantly affected by the range of petroleum
         distillates that may be spilled from a storage facility. The effects are numer-
         ous and underscore the necessity for strict safeguards against leaks and spills.
                 In addition to the potential for leaks and hydrocarbon er-assionsl there
         are harbor maintenance impacts similar to those described in the proceeding coal
         transshipment section. These dredging impacts are significant in the case of oil

         transshipment facilities because the sediments in the berthing areas are likely
         to have higher amounts of petroleum distillates due to leaks. When these
         materials are dredged up, the hydrocarbons may be released into.the water, or the
         dredge spoil may have a higher toxicity and present special problems for disposal.
         Finally, hydrocarbons and other chemicals may be discharged from ballast tanks
         sof ships during the loading of refined products. Their effects further degrade
         .water quality in the harbor areas.

                     (b) Cultural
                 Cultural impacts of oil transshipment facilities lie primarily in the

         aesthetic intrusion and safety categories.
                 Because of the organoleptic impacts of hydrocarbon emissions and oil
         leaks and spills, public attitude is the area most severely affected by these
         facilties. Odors from these emissions are generally disagreeable and their
         indirect effects may be seen in changes of land value in the vicinity of the
         facility. In the case of spills or leaks, drinking water quality may be
         negatively affected in an extreme case if ground or surface water infiltration
         by low viscosity distillates.
                 The probability of major accidents is low, but the magnitude is extremely
         high. In the event of a major spill, human service requirements for oil spill
         contingency plans must be met. These include personnel trained in oil containment
<pb n="256" />

                                                       238

                and clean-uptechniques, and the various paraphenalia, such as booms.and skimmers
                used in the clean-up process. Likewise, the potential for major fires exists and
                local fire fighting services must be prepared for special procedures for Petro-

                leum fires.

                         Economic benefits from these facilities are reflected primarily in tax

                revenues to the local area. Personnel requirements for maintenance and operation
                are low or.negligible and therefore, do not significantly affect employment or
                housing.

                            (5)  Refineries

                         The problems associated with crude oil and product transshipment were
                described in the preceding section. This discussion will focus only on those
                activities related directly to crude oil refining: air and water emissions,
                solid wastes, visual intrusion, and human service requirements. Because expan-
                sion of the present Great Lakes refinery capacity is unlikely and "standard"
                refinery characterization so difficult, this discussion will be as brief as
                possible, touching.only on major issues.

                                 (a) Air quality impacts
                         The principal air emissions produced during refinery operation are
                SOX31 NO  X, particulates, and hydrocarbons. In addition, a wide range of organic
                and inorganic materials are produced in various quantities:-olefins, aldehydes,
                ammonia, hydrogen sulfide, carbon monoxide and others. Table 30 shows estimated
                emission rates for a variety of refinery sizes and product mixes.
                         The technology is presently available to meet national air emission
                standards for all major pollutants with the exception of hydrocarbons [506, 370,
                and 222]. Measuring the impact of these hydrocarbon emissions is difficult,

                 however:

                         Current federal.standards are.based on total hydrocarbon
                         emissions. One of the major problems in measuring hydrocarbon
                         impacts is the difficulty in discriminating among "reactive"
                         hydrocarbons and inert forms. Reactivity is critical to the
                         formation of photochemical oxidants, which constitute the
                         major hydrocarbon-related air quality problem. At present,
                         there is no adequate basis for distinguishing between reactive
                         and nopreactive hydrocarbons; the subject is being studied by
                         the fe'deral government [506; pp.II-80].
<pb n="257" />

                                                                                                                                      238a

                                                                                                        W A T U It 11 L                                                                                                                                                       C U L T U R A L

                                                                              i) rf-5l CAI. 011MICAL (JMCTFRlr;rlr.S              BIDUrACAL CONMITICtis                          SOCIAL                                                                              Ermomic
                                                                                                                                 nmw:@'s           AQUATW             Annmrml(;@z Affb              1118f.tc
                                                                                            ff"IR1.11.0arvAr.    AlPRI5111YRIC     111:01119;y     rlr.()I.":l        intflAN INJERI:Sr             11VALI'll    FMrlAlV?lE"r    HNInIN(l    lN"AMlRlh:jlJPr,                                 LAM) VALOR
                                                                                          FM  'A      v I.XQ11)                                                                                                                                                                       Ar.Rlf3fl,lHlRAL   CTfUlrR(:lAl.  1"IMISTRIA1.
                                                                                                                                                                                       Fli  M                                                                     RE!;1hVNTlAl.
                                                                                           VArt,R     WA I Kit         jVAl.tlY
                                                                                                                                                                                    J4

                                                                                     p
                                                                                                                                                                                                                                                     Ji
                                  CROMM CLEARING Al"D "=11APING
                                  EQUIPMENT USE                                                                                                                                          I     f    I  I
                                  CrANVELIZATION SHOR         INE
                                                            OTHER
                                                            EL
                                    MODIFICATT   ON : An
                                    WATER-KEIA
                                                 TED ACTIVITIES
                                  MATERIAL MOVEMENT TO SITE
                                  INFLta OF TEMPOR,%RY WORK FORCE
                                  PUBLIC SERVICE REQUIRE@tZNTS
                                  [AND COK41TTED TO FACILITY
                                  OTHER

                                  HARBOR MAINTEKATICE
                                  WATER.MR)tE MATERIAL MOVDIERT
                                  OVIZ;RLJA6.N*D MATERIAL MOVOIENT
                                  mwdi SERVICE RrWimans
                                    DROCARBOM EMISSIONS
                                  LEAKS AND SPILLS
                                  VISUAL INTRUSION
                                  TTUKAN ACTIVITY D   ISRUPTION
                                  ACCIDENTS

                                                                                                                                                                               OIL         TRANSSHIPMENT FACILITIES

                                                                                                                                                                                              Figure 26
<pb n="258" />

                                                        239

                                                    TABLE 30

                                      ESTIMATED REFINERY AIR EMISSIONS
                                                J1000 lbs/day),

                                                S02         CO       NOX          HC     Particulates
               250 MBD, Low Fuel    Oil1        97.8        5.6      42.1        90..l        20.8
               250 MBD, High Fuel    Oil        84.0        5.7      35.1        91.9         17.2
                                       2            3
               100 MBD, uncontrolled           274.3      698.2      26.1        265.1        10.4
                                     4              3
               100 MBD,  controlled             24.0        0.2      22.5        27.0           3.1
                        5
               180 MBD                         102.6        4.7      63.2        62.4         23.1

                1  [5061
                2  [222], without   emission controls
                3  sox
                4  [222], with emission controls
                5  [3701

                               (b) Aquatic impacts
                     Water-related impa   cts of refinery operations arise from two sources:
            withdrawal and consumption., and effluents added to the receiving waters. As was
            indicated in the refinery description discussion, the dependence on water supply
            and wastewater disposal has decreased as water recycling within the facilities
            has increased. Water requirements (Table 16) are relative small, generally
            less than 10 mgd (15 cfs).. Estimates of withdrawals and consumption'for a
            250-mbd facility are:

                                                            Withdrawal Consumption
                                   low fuel oil               13.2 mgd         5.4
                                   high fuel oil              10 .5 mgd        4.5
                                                                                     [Source    506)

                     Waterborne effluents discharged by a refinery include both organic and
            inorganic materials. Table 31 presents estimates of pollutant concentrations
            in the water return flow from typical refinery configurations.
<pb n="259" />

                                                         240

                                                     TABLE 31

                             ESTIMATED WATERBORNE EFFLUENT      CONCENTRATIONS (ppm.)
                                               BODs        COD         Ss      Oil Phenols    IAmmonial   Total P
                250 MBD Low Fuel Oil,          43.22      291.72    27.60     12.96@ 0.28        42.05 T
                  Present Controlsl

                250 MBD Low Fuel Oil,
                  Advan ced  controlsi         13.68       74.43    13.68      2.64    0.06      16.71
                250 MBD High Fuel Oil,         30.49      206.48    19.69      9.12    0.19      29.44
                  Present Controlsi

                250 MBD High Fuel Oil,           9.75      52.82      9.75     1.92    0.04      11.76

                  Advanced Controls

                        2
                180 MBD-                       15         80        10         2       0.1        2         2

                1 [5061
                2 [3701, best available controls

                      The impact,of these effluents depends on the water quality an          d volume
             (flow) of the receiving waters. For large rivers and lakes, very few problems
             are anticipated using existing technology [370 and 506]. An analysis of the
             effects  of a new refinery on a large river in New England concluded:
                      The effluents from "new source" [existing control technology]
                      250-mbd refineries appear to pose very few water quality
                      problems in a large river, when considered independent of
                      ,actual receiving water quality above the point of discharge.
                      (If the receiving stream immediately above the refinery dis-
                      charge already contains high concentrations of contaminants,
                      even minor incremental loading may contribute to poor water
                      quality.) The 250-mbd "new source" refineries would probably
                      remove biochemical oxygen demand (BOD), suspended solids (TSS),
                      and chemical oxygen demand (COD), in greater.amounts than they
                      would contribute to most large New England rivers, thereby
                      improving certain aspects of water quality. The concentrations
                      of phenolics in the receiving waters would approach or slightly
                      exceed Massachusetts standards [0.001 ppm], but would be well
                      within the EPA recommended criteria [0.1 ppm]. Ammonia concen-
                      @rations would exceed the EPA criteria [0.02 ppm], but not those
                      of Massachusetts [0.5 ppm]. ...In summary, the 250-mbd refinery
                      modules with "new source" wastewater treatment technology would
                      appear to pose several minor but no major water quality problems/
                      in a large clean river [506; pp.II-50].
<pb n="260" />

                                                                                                                          REFINERY 6PERATION                                                   CobeSTRUCTION

                                                                                                                                                                     CRUDE O!L
                                                                                              MDUCT STOKArz                     PLANT OPERATION                      RECEIVI. G
                                                                                               AND S I
                                                                                                      u Fri*;                                                       A.HD STORAGE

                                                                                                                                                                                                      R   M    -9

                                                                                                                               @g  ;5

                                                                                                                                                                                                                            SO I L

                                                                                                                                                                                                                                     Fln-'s

                                                                                                                                                                                                                            QUAVT-":-@            13'
                                                                                                                                                                                                                            rwisic.;

                                                                                                                                                                                                                            PHyEZc%I.

                                                                                                                                                                                                                            I'LGCII-l -ZTEl-lC,--Z-;T

                                                                                                                                                                                                                            Mrs ICAL

                                                                                                                                                                                                                            cizmz=

                                                                                                                                                                                                                            V=-MTzrX

                                                                                                                                                                                                                            -;TLZLIF-

                                                                                                                                                                                                                            sontic

                                                                                                                                                                                                                            1. MT0.11 Ic

                                                                                                                                                                                                                            n.,KTCI;lc

                                                                                                                                                                                                                                     'IZST.%S

                                                                                                                                                                                                                            ILAN13SCAPS DESIGNS
                                                                                                                                                                                                                            uniqu    HYSECAL
                                                                                                                                                                                                                                     5
                                                                                                                                                                                                                            F U.I.,;ZtE P
                                                                                                                                                                                                                            jPAS-KS  RESZ&amp;VES
                                                                                                                                                                                                                            iSPSCTzS
                                                                                                                                                                                                                            ?.IS7cRICAL CR
                                                                                                                                                                                                                            1ARCHEOLOCICAl   SITES

                                                                                                                                                                                                                            AMIENT, MISE     LEVELS
                                                                                                                                                                                                                                          Tz.
                                                                                                                                                                                                                            JAIR ';UALITY
                                                                                                                                                                                                                            ISAFETY

                                                                                                                                                                                                                            SHORT TER.4

                                                                                                                                                                                                                            LONG TERM

                                                                                                                                                                                                                            SHORT MM

                                                                                                                                                                                                                            LONG TBR' .4

                                                                                                                                                                                                                            -;As-rr- DISPLSAL
                                                                                                                                                                                                                            UTTLIT-1ES
                                                                                                                                                                                                                                          SM&amp;UM
                                                                                                                                                                                                                            I SA:--.-f iEaVECZS      1 A

                                                                                                                                                                                                                            REX.O=

                                                                                                                                                                                                                            ADJACENT

                                                                                                                                                                                                                              JACM

                                                                                                                                                                                                                            FISCAL zl--sc-ls

                                                                                                                                                                                                                            2USIrESS ACTIVtTT

                                                                                                                                                                                                                            W=EMIESS AND
                                                                                                                                                                                                                            opEl S?.%CZS
                                                                                                                                                                                                                            vEr-JOIDS
                                                                                                                                                                                                                            IFORESTS

                                                                                                                                                                                                                            jAGAICULTUIS
                                                                                                                                                                                                                            !RsSmvr:AL
                                                                                                                                                                                                                            Cc?--I:tclAL
                                                                                                                                                                                                                            rmLs-mz.%L
                                                                                                                                                                                                                            DESIGNATED    LANDS

                                                                                                                                                                                                                            WrKm
<pb n="261" />

                                                 241

                          (c) Cultural impacts
                  Of all facilities examined in this study, refineries require the largest
         operational work force. As shown in Table 20, the estimated employment.during
         the operational phase varies from 410-550 persons for a 200-250-mbd facility.
         Furthermore,, because average.refinery wages are higher-than-@-average for the
         economy.as a whole [506; pp.I-29], the indirect employment and income gains to
         the local and regional economy could be significant. Also, the,tendency for
         associated petrochemical plants to locate near large refineries could bring in
         significant numbers of new jobs and income.
                  An important consideration is-the land committed to the facility on a
         long-term basis, espe cially concerning the uses displaced by it. As the dis-
         cussion of refinery land requirements indicates, a facility of the size con-
         sidered here would require from 1,500-2,700 acres, a substantial committment of
         land on a local and even regional scale.
                  Other concerns of a site-specific nature are related to aesthetics,
         noise, and public safety hazards.
                  The accompanying activity impact  matrix for  refineries  (Figure 27)  can
         be used to evaluate potential impacts of   a proposed  refinery.
<pb n="262" />

                                                       242

                    5. FACILITY COST ANALYSIS

                        a. Introduction

                        The economics of site location depend   on the variations of costs and
                prices over space and time that arise through  differences in@resource and pro-
                duct availability and distribution. Some of   the basic economic factors' that are
                considered when examining and comparing energy facility locations are the avail-
                ability and cost of capital, infrastructure, labor,'transportation, facilities,
                and the natural resources necessary for production and waste disposal, such_ar@

                air, water, and land.

                        The following factors are related to the determination of power plant

                location in the coastal zone:

                        9 The cost of transporting fuel from its origin to the energy facility
                and of onsite fuel storage.
                           The cost of a cooling system (including transporting water from
                source to plant).
                           The cost of product storage and distribution to consumers and the
                relationship of distribution to the distance of consumers from the facility.
                        9 The opportunity cost of using land on the coast for energy facilities

                rather than alternative uses.

                           The cost of environmental controls, including air and water quality
                controls and transportation and storage of solid wastes@

                        Energy facility siting requires tradeoffs among these factors. Table.32
                is an example of such tradeoffs developed by the Rand.Corporation for power
                plants located in California. Caution should be exercised in using th'--se fig-
                ures because of their regional specificity. However, this chart does show some
                of the tradeoffs that can be important in siting power plants. These tradeoffs
                are of the type that must be made in comparing coastal and inland sites.

                        b.@ Fossil-Fuel (Coal) Power Plants

                            (1) Fuel Transportation and Storage
                        The three major coal-producing areas which serve the   Great Lakes Region
                are: the Eastern Province, the Interior Province, and the Northern Great Plains
                Province (Montana,'Wyoming, North Dakota, and South Dakota).    These areas are
                shown in Figure 28 [222].
<pb n="263" />

                                                       243

                                                 Table 32

                                       MISCELLANEOUS COST  COMPARISONS

                               INLAND COOLING VS. ONCE-THROUGH WITH    SET -BACK
                                   . Wet cooling towers a s-- 2 mi of set-back
                                   - Dry cooling towers se6 mi of set@-back

                               WATER CM4VEYANCING   VS. TRANSMISSION
                                     1 mi of water  conveyancing -_ 1 mi of

                                     transmission lines

                               LATER COST VS. 14ATER CONVEYANCING COST

                                     Water.cost at $100/acre-ft@F_- 18 mi of

                                     water conveyancing

                               DRY COOLING T014ERS VS. TRANSMISSION
                                   0 Nuclear: dry cooling tower ;t; 240 mi of

                                     transmission lines.

                                   . Fossil-fuel: dry cooling tower sz::170 mi
                                     of transmission lines

                               WET COOLING TOWERS VS.. TRANSMISSION
                                   * Nuclear:. wet cooling towerszz: 70 mi of

                                     transmission lines
                                   * Fossil-fuel:- wet cooling towera ;@, 60 mi
                                     of transmission lines
                                                                                         [1491
                                   aNo water or water conveyancing costs in-

                    There is a great deal of variation in the heat content of coal, depend-
          ing upon its origin. Western coal contains 7,800 to 8,800 Btu per pound, with
          an average of 8@300 Btu per pound, although some coal has up to 13,000 Btu per
          pound [3161; Illinois and Indiana coal ranges from 10,500 to 13,000 (213] Btu
          per pound, with an average of 12,000 Btu per pound; and Appalachian coal varies
          from 10,000 to 13,000 Btu per pound, with an average of about 12,000 Btu per
          pound.
                    The Great Lakes Basin has four major coal transportation routes. Coal
          is transported by unit train from the Appalachian area to Lake Erie ports and
          shipped from there to other United States and Canadian Great Lakes ports (51%
          of the coal shipped      Iout of Lake Erie ports went, to Canada in 1975). The second
<pb n="264" />

                              Coc3t Proyinco                                                                            I
                                       I?OCk.Y 110MIGin PfOVIrCO
                                                    ,NorP,,ar,n Grect Ploins Provinco         Intorior Pmvi'nco

                                                                                                       0

                                                                                                                                  4-

                     Anthracite
                                                                                                    Eastarn Plovll7co   I
                     Bituminous coal
                 nj

                     Subbituminous  coal

                     Lignite                                            Guff Provinco

                                   Figure 28    Disll---ributioi-i Of' Ui'li'Lcd Statos CoaJ. -Rosources

                                                    Source:     B1,1YI, 1974: 1-47
<pb n="265" />

                                               245

         route is from Illinois and Indiana coal fields by unit train to the Chicago area'
         and the lower part of Wisconsin along Lake Michigan. The third and most recent-
         ly developed route is from the west by unit1train to the Lake Superior ports of
         Duluth and Superior. Currently, coal from the Superior coal dock facility is
         shipped to ports on the St. Clair River at the southern end of Lake Huron. Wes-
         tern coal may soon be shipped as far as Buffalo. The fourth route, also devel-
         oped recently, is by unit train from the west to Minnesota, Wisconsin, Illinois,
         and Ohio.

                 The costs of transportation are important considerations in the future
         location of the coal-fired power plants in the Great Lakes Basin. Coal deli-
         vered by unit train is less dependent upon coastal siting than coal delivered
         by ship or barge. Locations east of Chicago probably would not receive western
         coal by unit train because the cost of receiving that coal would increase sub-
         stantially, due to problems and costs of transferring the coal to lines of other
         railroad companies.
                 Important economic parameters that affect the cost of shipments are vol-
         ume, distance, capacity, speed, return trip cargo, and mode. Delivery of coal
         can be less expensive per mile if there is a return cargo, if it is delivered
         by unit rather than conventional train, if there are higher volumes, and if the
         cargo travels longer distances (although short routes with high volumes,can be
         less expensive in some'cases than longer routes). It should be noted that these
         factors will change with the location of the receiving site.
                 A comparison of slurry pipeline and unit train costs per mile (shown in
         Table 33) illustrates that their costs are closely competitive. Shipping coal
         on the lakes is less expensive per mile than other modes, but shipping dis-
         tances are generally greater on water than on land.

                          (a) Western coal

                 A comparison between railroad unit  train delivery and a combined unit
         train-ship delivery of coal presented in Table 34 shows that it is economically
         feasible to deliver coal by unit train-ship from the western coal regions to
         Detroit. Although not indicated by Table 34, it is also economically competitive
         to deliver coal to Buffalo by this method. (Power companies serving the western
         New York area are considering this possibility.) The estimated cost of trans-
         porting coal to Buffalo by unit train-ship combination is $11.19 per ton; to
         Cleveland, $10.36 per ton.
<pb n="266" />

                                                                246

                                                               TABLE 33

                                                  COSTS OF COAL TRANSPORTATION
                                                          (1972 ESTIMATES)

								Costs
                                             (dollars per 10 12
          Type                               Btu's transported)		Distance Assumed      Cost per Ton-Mile
                                                                            (miles)           (cents per ton-mile)

                                         Fixed		Operating	Total

             Unit Train                  5,100      79,800        84,900          300                       0.7

             Conventional Train           9,240     145,000       154,000          300                       1.3

             River Barge                	4,850		35,600        40,400		300                       0.3

             Slurry Pipeline           48,500      20,800        69,300          273                       0.6

             Ship**															.5

                  Source: (Hittman, 1974, Vol. I, Tables I and         2 and associated footnotes.)
                       Personal communication, Argonne National Laboratory.                                           [218)
                       1976 Dollar Figures.

                           Slurry pipeline is another mode of transportation that can be used to
                deliver large quantities of coal. The estimates by Hittman Associates (218)
                show unit train and slurry pipeline are economically competitive with each other
                under certain conditions. Slurry pipeline is much more specialized and requires
                high initial capital outlay. It is considered a serious alternative only when:

                           *   No other transport exists.
                           *   Volumes between origins and destinations are large and steady.
                           *   Pipeline    transport offers a more direct route (especially over rugged
                               terrain).
                           o   The solid coal is reduced to a slurry of fine particles during part
                of its normal processing.
                           o Water for transport is readily and cheaply available.

                           If one assumes new rail branch-line construction rather than transport
                by existing lines, costs per ton-mile for pipelines are competitive under the
                following conditions for solids:

                           Tons per year                                                  Competitive with
                           (in thousands)                                                 Railroads Over:

                                    500                                           All distances
                                  1,000                                           Distances over 70 miles
                                 2,000                                            Distances over 150 miles
                                 5,000                                            Distances over 250 miles
                                10,000                                            About the same over 300 miles [3121
<pb n="267" />

                                                                    247

                                                                Table 34

                                          Transportation Cost-, (April- 1974 Dollars)
                                                     Per Ton of Delivered Coal

                   Midwestern Point
               (D=Distance in Miles)                          1974                      1978                     1982

                                                P o w d e r R i v e r B a s i n
               Chicago (D=1172)                         $ 8.08 (9.20)       2         9.10 (10.36)         $10.24 (11.76)

               Detroit                                     9.96 (9.78)              11.21 (11.01)            12.63 (12.39)@

               Milwaukee (D=1257)                          8.66                       9.77                   11.00

               Indianapolis (D=1266)                       8.74                       9.84                   11.07

               Cincirmat'i (1):=1304)                      9.14    (9.67)           10.14    (10.88)         11.37    (12.25)

               Clevela@id     (D=1512),                   10.43                     10.77                    13.21.

                                                         11 a n n A       B a s i   n

               Chicago (D-1128)                            7.78                       8.76                     9.87

               Dc--troit                                   9.66                     10.87                    12.24

               Mlilwauk,ce (D=1213)                        8.37                       9.42                   10.60

               'Indianapolis (D=1273)                      8.78                       9.90                   11.14

               C-Irtc-1--n-nati (D@1361)                   9.40    (10.24)          10.58                    11.89    (12.99)

               Cleveland (D=1468)                         10. 13                    10.92                    12.84

                                                                     n t a

               Chicago (1&gt;1,.,
                                                          -1.0.20                   11.47                    12.91-

               DetroiL (D=-L7/,'-,t9)                     12.07                     1.3.59                   15.30

               N@ilwaukee (D=1562)                        10.78                     12.13                    13.66

               Indianapolis (D=1585)                      10.94                     12.32                    13.85

               Cincinnati (D@1612)                        11.30    (11. 53)         12.53     (13.03)        14.09    (14, 67)

               Clevc1and (D=1817)                         12.54                     1A.11                    1.5.89

               111"ttilroad d-istance -.11easured from the Bandy Railroad Atlas-of the U.S. (Rand McNkilly)
               2Njjf@,,,,)crs in parenthesis correspond to rail             water rOLItes
                    f-Argonne National Laboratory has indicated.that these figures have increased three
                      to four dollars a ton.
<pb n="268" />

                                                    248

                      It is difficult to obtain land for construction of slurry pipelines
              without the power of eminent domain. Most states do not have laws granting land
              condemnation power for slurry pipelines. Capital construction costs are 70%
              [312] of the total costs of-slurry pipeline operation and construction.
                      Slurry pipelines transport a single substance (coal) from, a single point.
              .There is a tremendous risk in building such a specialized line due to changes in
              the fuel transportation patterns, coal gasification costs, or costs of desul-
              furization. One slurry pipeline in Ohio has not shipped coal since 1958. The
              purpose -of this pipeline was to reduce coal shipping cost by offering competi-
              tion to railroads. However, the railroads proved to be a more adaptable trans-
              portation mode and were more economically desirable.

                      In the Great Lakes Basin the most likely destination for a slurry pipe-
              line from the western United States, from an economic standpoint, would prob-
              ably be the Chicago area. Such a facility would probably not be dependent on

              coastal locations, unless the coal slurry were transshipped to water carriers.
              The uncertainty of origin and type of fuels that will be used in the U.S. in the
              future and competition from railroad and barge lines will likely restrict any
              possible development of slurry pipelines to the Midwest.
                      The location of power plants at western coal mines and transmission of
              electricity to the Midwest is an exceedingly expensive option, due to the high
              cost of building transmission lines compared to using existing railroads for
              coal shipment [307].
                      In summary, the most likely mode of transportation from the western coal
              region in the next 5 years is unit train,.or a combination of unit train and
              ship. Power plants west of Lake Michigan are not as coastal dependent with res-

              pect to deliveries of coal from the western United States as are plants that

              must receive western or Appalachian coal transported by a combined unit train-

              lake carrier movement.

                             (b) Eastern coal
                      Obviously, since Appalachian and Illinois basin coal is transported
              shorter distances (50 to 400 miles) than western coal (900 to 1,400 miles) to
              reach the Great Lakes Region [5501, eastern coal transportation costs are lower.
              Coal from these regions is transported by unit train to power plants in the
              Great Lakes Region.
<pb n="269" />

                                                  249

                    The typical costs for transporting coal from the Appalachian field to
           ..the Great Lakes range from 2.50 to 4.00 dollars per ton in 1973 dollars. These
            costs depend upon the origin and destination of coal. The cost of transporting
            southern Illinois coal to the city of Chicago is approximately $2.00 per ton,
            and to the State of Wisconsin is approximately $4.50 per ton in 1976 dollars.
            The@costs vary by contract, type of delivery, distance, and other regional con-

            siderations.

                           (c) Short distance hauling
                    Power facilities located at inland sites near but not on the coast may
            receive fuels from water ports. In this situation, the additional cost of
            transporting the fuel is reflected in the cost of locating the facility inland
            as opposed tolon the coast. The total cost of the coal may be less if it is
            transported to the plant entirely by railroad. In this case, the incremental
            cost of locating the facility inland (as opposed to on the coast) may-be less
            than it would be if the coal were transported by.water and then from the port

            to an inland location.

                  . There are a number of ways to-transport coal over short distances,
            truck, conveyor, slurry pipeline, train, and barge being the most common.

                    Trucks, although commonly used At mines, have limitations in the
            coastal zone. Economic considerations require use of large trucks which are
            generally undesirable or illegal for street use. Off-street use of large mine
            trucks requires an access road with approximately 53 feet of right-of-way or
            6.4 acres per mile from the harbor to the power facility [4001.
                    Conveyor belts can transport coal and wastes along a fixed route on an
            access strip. Conveyors require approximately 30 feet of right-of-way or 3.64
            acres of land per mile [4001.
                    Pneumatic slurry pipeline is a new technology for t ransporting coal.
            The pipeline would require a right-of-way of approximately 62.5 feet, but.could.
            be buried [400]. For new technologies such as this, costs are subject to change

            more rapidly than in existing and proven,technologies.
                    Unit train transportation of coal for short distrances is expensive be-
            cause of high loading and unloading costs in addition to other slowdowns and

               Personal Qommunication, Commonwealth Edison

               Personal.Communication, Wisconsin Electric, Power Company
<pb n="270" />

                                                  250

          delays incurred by using a long train over a short distance. According to one
          industry source, it would be virtually impossible from an economic standpoint
          to move a unit train 15 miles or less. Rail transportation lends itself to
          longer hauls.
                 .Barge transportation of coal from ports and terminals inland is limited
          to special areas with water access and inland dock facilities.
                  'Table 35 presents a cost comparison among methods used for short dis--
          tance transportation of coal. Although the estimates are not all for the same
          base year, the costs listed are indicative of the relative differences between
          modes.  The cost estimates indicate the following order of transport modes by
          cost per ton-mile for a 5-mile distance, from lowest cost to highest: slurry
          (water) pipeline, truck, unit train, and conveyor belt. The (updated) 1974 cost
          estimates for unit train and conveyor belt transport of coal suggest that the
          two modes are about equal in cost over the.5-mile distance.

                                                Table 35

                                 SHORT HAUT, CQAL:TRANSPORTATION COSTS
                                                               TONNAGE        COST PER TON-IMILE
          MODE                     YEAR             MILES      PER DAY               (Cents)

          T ru c              1972 (estimates)       5-10                            4.5 (A)
                             (July '74)updated          5                            4.7 (B)

          Conve-ior Belts     1972 (estimates)          5                            7.6 (A)
                              (July '74) updated        5                            5.4 (B)

          Unit Train          (July '74) updated        5                            5.4 (B)

          Slurry Pipeline     May 1975                  4.5 (above 2000 tons)     1@-2@ (estilptate.3), (C)

          Slurry Pipeline     (July '74) updated        5                         1.2 excluding
                                                                                               c@
                                                                                   grindin(I equip. (B)

                                   (A) [2221
                                   (B) [211]
                                   (C) [ 218]

           *Personal communication, Chessie System.
<pb n="271" />

                                                      251

                     However, additional considerations change the relative ranking of the
            alternatives. Unit trains would probably not be used to transport coal from a
            coal unloading dock to an-inland electrical generating or storage facility lo-
            cated 15 miles or less from the dock because of loading costs and delays. Ad-
            ditionally, large trucks presently used to transport coal at mine sites would
            probably not be used for the short haul of coal from docking facilities to in-
            land sites over public roads and highways due to the weight of the trucks.and
            environmental concerns such ag noise and coal dust. Thus, conveyor belts and
            slurry pipelines@are the primary modes that would be used to transport coal
            from shoreline coal unloading docks to inland sites over distances of 15 miles

            o
               less,[211, 218, 222]. Additional costs must be considered for slur
             r                                                                            ry pipe-,
            lines for grinding the coal for slurry pipeline use and dewatering the coal
            slurry (if,pneumatic lines are not used) after movement to destination. There-
            fore, conveyor belt transport is the mode most likely to be used for the short
            haul transportation of coal from a shoreline dock to an inland facility.

                          (2) Cooling Systems

                             (a) Cooling system types
                      A major determinant in the location of coal power plants is the cost of
            providing a sink for waste heat. Water is the primary natural resource used as
            a heat sink, although air can also be used in some cases. Costs vary for pro-
            viding water and cooling systems to coastal and inland locations.
                     There are five basic types of cooling systems used for fossil-fueled and
            nuclear steam-electric plants: 1) once-through cooling, 2) wet        cooling towers
            (mechanical and natural draft), 3) cooling ponds, 4) spray channels, and 5) dry

            towers.

                     A nuclear power plant requires 50 percent more cooling water than a         coal
            plant of the same capacity, due to thedifference in heat rejection rates to            the
            cooling water and stack losses. This difference for coal power plants is 67%           of
            that for muclear power plants. As a-result, coal-fired plant cooling systems
            cost less than systems used on nuclear plants of the same generating capacity
            [21-1, 1491. As a rule of thumb, the cost of the cooling system for nuclear pow-
            er plants is assumed to be 50 percent more than that of a coal-fired plant. For
            this study's generalized facilities it is 45 percent.
                     There are two major costs to consider in analyzing cooling@systems: 1)
            capital costs (costs of building the system) and 2) operation and maintenance
            costs. Once-through cooling systems are used as a standard or base against
<pb n="272" />

                                                                                252

                        which to compare other cooling systems. Table 36 shows that there is a loss in
                        plant efficiency and plant capacity and an increasein auxillary power consump-
                        tion when other systems are used. These losses and increased power consumption
                        arereflected in higher operation and maintenance costs.

                                                                           TABLE 36

                                        COOLING SYSTEM EFFICIENCIES FOR 800 MW COAL-FIRED PLANTS

                                                                                Once       Wet                        Dry
                                                                                Thru,   Mechanical      Natural       (Mech)

                                         Lost Capacity                          Base          1%            1%        9%
                                            (Due to Higher Back Press)
                                         Loss in Efficiency   1                 Base          1%            1%        10%
                                            (Increased Heat Race)
                                         Auxillary Power  1                     Base       0.5%           0.25%       1.25%
                                            (Consumption)
                                         Land Requirements   2                             3-5            2-3         5-7
                                            (Acres)

                                                                                                            SouLrce-  [1491
                                                Based on various reports, and manufacturer's information
                                             2  These land requirements are for comparative purposes only, not to
                                                calculate total station land needs.

                                   The capital costs in Table 37 were compiled for various cooling systems
                        from an    Atomic Energy Comm-Ission report on power plant costs (3081. Historical-
                        ly, once-through cooling has been the least expensive cooling method.

                                                                  Table 37
                        ESTIMATED COSTS OF TWO-UNIT [1300 MW(e) EACH] COAL FIRED-PLANT WITH ALTERNATIVE

                                                                COOLING SYSTEMS
                                                                      Withovt       With            Increased Costs Above
                                    Once-Through Cooling              Abatement     S02             once-through Cooling Costs
                                        Capital- Costsa                  945        1150                Base      Base
                                        Dollar's per kilowatt b          363        442                 Base      Base

                                    Wet Natural Draft Cooling Towers

                                        Capital costs                    983        1194                38+       44+

                                        Dollars per kilowatt             378        459                 15+       17+
                                    Hechanical Draft Cooling Towers     c

                                        Capital-costs                   .958        1164                13+       14+

                                        Dollars per kilowatt             368        448                   5+        6+
                                    a Capital costs in millions of dollars (mid-1974 dollars)                  Source: [308]
                                    b   Capital costs in dollars per kilowatt of plant capacity
<pb n="273" />

                                                 253

                   The cost figures in Table 38 compare alternative cooling  systems for
           nuclearpowe r plants [511. The figures are updated to.1975 dollars from 1973
           .dollars in the manner explained below the table and are based on a lower heat
           rejection rate for coal-fired plants than for nuclear plants. The entry en-
           titled "Evaluated Present Worth of Cooling System,, Millions of Dollars" presents
           the capital costs for the various systems and the entry entitled "Increase in
           Generation Cost, Mills per Kilowatt-Hour" gives the operation and maintenance

           costs.

                   From a capital cost standpoint, once-through cooling is the least expen-
           sive plant cooling system. At present,  however, closed-cycle cooling is re-
           quired unless a utility company can prove, on the basis of meeting certain cri-
           teria presecribed by the U.S. Environmental Protection Agency (see Section
           III.B.l.d.), that its once-through cooling system will not cause-serious envi-
           ronmental damage, and thereby receive.a variance from this requireme .nt. The
           data for closed-cycle cooling systems show that wet natural draft towers, wet
           mechanical draft towers, and spray canals are all economically competitive cool-
           ing systems, and the ultimate choice is dependenton site conditions. Environ-
           mental impact statements for nuclear and coal-fired plants show a wide variation
           in the costs of cooling systems. The reports [51, 181, 203, 235, 279, 308, 312,
           149] do, however, indicate that wet mechanical draft towers are currently the
           least costly closed-cycle cooling-system. Wet natural draft cooling towers are
           closely competitive to wet mechanical draft, but are restricted in use due to
           geological and atmospheric considerations. Recent experience with spray canals
           shows that operation and maintenance costs have been much higher than reported
           in the Nuclear Regulatory Commission's Nuclear Energy Center Site Survey [48-541.

                          (b) Cooling water supply
                   A power plant located inland but near the coast could have water trans-
           ported to it by pipeline from the Great Lakes. Supplying water for a 1,000 MWe
           power plant with a once-through cooling system would require a pipe ten to twenty
           feet in diameter. An evaporative cooling system would only require a one to
           three-foot pipe. The exact diameter of the pipe needed depends upon many fac-
           tors, such as the velocity of the water, the hydraulic resistance of the pipe,
           and the volume of water required to ensure proper heat exchange.
                   The operation and maintenance costs of supplying water by pipeline.de-
           pend on pumping costs, which are a function of the height the water is pumpedi
<pb n="274" />

                                                                                                                 Table 38

                                                                        COMPARISON OF COSTS AND EFFECTS ON NET CAPABILITY FOR
                                                                                              1200-MWe NUCLEAR GENERATING UNIT
                                                                                                    (Figures in 1975 Dollars)

                                                                                                                                  Evaporative Coolinq.                                               Dry @Cooling
                                                                                                  Once-               I'Viech.          Natural                          Spray                 lyl 0 r. h                    u r;, I
                                                                                                 Through              Draf t              Draft             Pond         Canal                 Draft                       D-aft

                      Plant Cipacib-ility at@ Dcsign
                                                                                                  11200             1,177               1,170             1,159         1,156                 1,,-22                      1,029

                                                                                                                                                              4.5           8.0                   3.5                         3.8
                                                                                                      3.3               6.6                7. 0

                      Fen Po-1.4er Requirercnts,
                                                                                                                        3.5                                                                    14.9

                      coolin; Syste"i caoita"I
                                      -t, "'lillions 01,
                               a rsa                                                                14.9              19.5                21.1              35.9          18.1                 33.2                        40. f

                           j uated Present 'v@o-th of
                         co-'114ing sy@tc.-,,     mi -1 -11 i 0 n s
                         of -nr)llars@)                                                             34.,-4            65.1                64.7              94.8          70.1                210.9                       20.2.5
                                                                                                                                                                                                                                                     Ul

                      Increase in Genorati           on Cost'
                               s !, e r K i I c@,x a Vt.- - h o u r                                 Base              .397                .397              .794           .464               2.307                       2.197

                         The above dollar figures were approximated                                           from     1973 cost           data to          1975     cost data by mulLiplying by the
                         factors indicatc-d below.

                      a  1973 Cooling System Capital x 1.2
                      b
                         19-13 Evaluated Present Worth x 1.3
                      c  1973 Generation Cost x 1@6
                      These corrections are approximate based on NECSS st-udy                                                      assumptions of: (1) 30 year unit                                  life; (2) 10% discount
                      rate; (3) 15 mill value of replacement power; (4) 2@.),',' increase in capital cost; (5) 70%                                                                                   capacity factor.
                      The above chart and dolla                        r figures were developed Lnd adapted from a Nuclear laegulatory                                                               Agency Commission report
                      [511, and from Nuclear Regulatory Cormnission staff.
<pb n="275" />

                                                                         255

               the distance from the water source, the type of power plant, and -the.type of

               cooling system. Table 39. shows how operation costs vary by distance from water
               sourceand height that the water is raised. The cost of operation increases
               drastically with the distance and height that the water must be pumped. In
               general, power plants with once-through cooling will be used when the elevation
               of the site does not significantly increase operating costs. The operating costs
               for conveying water for closed-cycle cooling will not generally affect the selec-
               tion of a site. In the Wisconsin Electric Power Company Environmental Report on
               .the Pleasant Prairie Power Plant [552], three of the potential sites located
               along Lake Michigan would not have used once-.through cooling systems due to the
               height to which the water would have had to have been pumped and the distance

               from the plant to the,end of the pipe in the-water.

                                                                     Table 39

                                    OPERATION COSTS FOR WATER CONVEYANCE BY PIPELINE,
                              BY DISTANCE, AND BY TYPE OF FACILITY FOR A 1000 MWe PLANT
                                                                    (Mills/kWh)

                                                                   C 0 A L                         N U C L E A R

                            (HEIGHT WATER IS CONVEYED) 3 FT.          50 FT.    100 FT.       3 FT.     50 FT. 100 FT.

                               DISTANCE FROM
                               WATER SUPPLY                                   CLOSED CYCLE COOLING

                                 1,000 Feet                 .6024      .0168      .0315       .0031                .0419
                                 I Mile                     ..0089     .0230      .0380       .0112     .0300      .0500
                                 5 Miles                    .0409      .0550.     .0700       .0512     .0700      .0900

                                                                              ONCE-THROUGH COOLING

                                 1,000 Feet                 .0776      .4536      .8536       .0993     .5693    1.069
                                 1 Mile                     .3070      .6830    1.083         .3960     .8660    1.366
                                 5 Miles                   1.439      1.815     2.215         1.360    2.180     2.830

                             NOTE:   1972 dollars are projected to 1985 dollars at 3%        for operation costs.
                                     The differential between:.nuclear and coal operation cost for water
                                     conveyance are due to the higher BTU/Kwh for nuclear power plants.
                                     Figures are from formulas derived by a Rand Corporation Report Electrical
                                     Generating Cost Model For Comparison of California Power Plant Siting
                                     Aiternative@s, Rand Corporation, 1973, p.24.

                            Capital costs for pipelines vary directly with the diameter                                of the pipe,
               length of pipe, type of cooling system,                       and cost of land. Both evaporative
<pb n="276" />

                                                                                  256

                        cooling and once-through cooling systems require intake and outfall pipes.
                        Table 40 shows the cost of pipelines for different cooling systems.

                                                                                TABLE 40

                                                                      WATER PIPELINE COSTS

                                                                       NUMBER OF 1000 MW       CAPITAL COSTS           YEAR OF
                                         COOLING SYSTEK                  POWER PLANT UNITS        PER MILE             DOLLAR

                                         Evaporative Cooling
                                          System                               1                $158,400            1985 from
                                                                                                                    1.972-1/ at
                                                                                                                    5% inflation
                                                                         2 units (1234 MW)      1,020,000:@'        1974
                                                                         4 units (4800 MW)      1,071,428           1973
                                                                                                  223,214-4/        1973

                                         Once-Through cooling                  2                20 000,000          19761./
                                            System                             1                10:000,0006/
                                                                                                 9,963i360          1985
                                                                                                                    estimated from
                                                                                                                    19793/

                                            Communication, Detroit Edison
                                            Communication, Commonwealth Edison
                                            1985 dollars estimated at         inflation race of 5% per year. [311]
                                            Th. proportion of cost for a 1000 MW unit of the 4800 MW - 4 unit costs.
                                            Cost for I pipeline would be     much higher than the figures indicate, but
                                            it is assumed that if power plants were located inland from the coast,
                                            then more than one plant would be built to take advantage of these
                                            economies of scale.
                                         5/ The average cost per mile derived from cost daca for a five-mile pipeline.
                                            [573, 5741
                                         6/ The proportion of cost for a pipeline serving a 1000 MW unit of a 2000 '-4W 2
                                            unit plant. The cost for one pipeline would be much higher than chis figure
                                            indicates, but it is assumed that if the power plant were located inland, then
                                            more than one unit would be constructed to take advantage of economies of scale.

                                    In general, once-through cooling would not be used for a facility loca-
                        ted two or more miles inland. For example, cooling system costs for a 1200 Mwe
                        coal-fired power plant with a once-through.cooling system located- two miles in-
                        land are shown in Table 41 to be approximately the same as those of a plant
                        with a closed-cycle cooling system, because of the rapidly increasing operation
                        and maintenance costs of the former system, Costs for specific sites vary de-
                        pending upon site characteristics.
<pb n="277" />

                                                                     257

                                                                   Table 41
                                    COST OF    PROVIDING WATER TO A COAL-FIRED POWER                 PLANT
                                        WITH   1200'MW CAPACITY SITED TWO MILES INLAND

                                          ONCE-THROUGH COOLING

                                             Pipeline Costs
                                                               A. Capital         $20,000,000  (a)
                                                               B. Operation            0.5279 Mills K,,h(b)(d)

                                          CLOSED CYCLE COOLING (MECRANICAL.DRAFT)

                                             Pipeline Costs
                                                                                     $500,000
                                                               A. Capital           $2,000,000(e)
                                                               B. Operation            0.0153 Mills Kwh  (b)(d)
                                                 The cost of the mechanical  Draft System which is more
                                                 than the Once-through Cooling System.

                                                               C. Capital        .5 30, 700,000

                                                               D. Operation and
                                                                                                     Ih (c)(d)
                                                                   Maintenance         0.397 Mills Kw
                                  (a) 1976 dollars
                                  (b)
                                      1975 dollars     adjusted at 3% per year from 1985 dollars to"1973
                                                       dollars, and increased at'9.3% per year to 1975.
                                  (c) 1975 dollars
                                  (d)
                                      Pumping costs assume 3   ft. per mile which maximizes the use of once-
                                      through cooling.
                                  (e) 1974 dollars

                           If a variance to current            Environmental Protection           requirements is not
                obtained@or if once-through cooling cannot be used, the principal cost of lo-
                cating a power plant that uses Great Lakes water one mile                         inland-from the shore-
                line would, then be the cost of conveying water for an evaporative cooling system,
                or about $250,000 to $1,000,000 per mile. "This is not to say that such vari-
                ances cannot be       obtained at a reasonable expenditure of time and resources by
                the utility. Section 316[a] (of the Federal Water Pollution Control Act Amend-
                ments of 1972) exemptions to             the,closed cycle cooling requirements have been
                granted to Great Lakes'stations."
                           If a given site would qualify for a 316[a] exemption, the differential

                  Communication, Commonwealth Edison
<pb n="278" />

                                                     258

             cost of locating inland would be the cost of conveying water for a once-through
             cooling system up to a distancL- of two miles. This cost.is approximately
             $10,000,000 per mile and 0.307 to 0.396mills per kx@h, assuming a 3 foot change
             in elevation. When a closed-cycle cooling system has to be used, the differen-
             tial cost is that of using a closed-cycle system versus a.once-through cooling
             system. This cost is $30'to $45 million for the differential in capital costs
             of the systems, 0.397 to 0.517 mills per kwh for the differential in operation
             and1maintenance costs of the two systems, and $250,000 to $1,060,000 per mile
             for the water pipeline costs. In any event, economics have a strong bearing on
             the type and design of cooling systems.

                          (3) Electrical Transmission System
                      The electricity produced by power plants is consumed at load centers
             which are,primarily in the urbanized areas of the Basin. The cost of transmit-
             ting the electricity t  o the load centers from the power plant is primarily de-
             pendent upon the cost of thetransmission facilities. These costs encompass
             transmission lines, their associated terminals., substations, and step-down
             transformers at major load centers. In recent years the location of power
             plants in relation to regional and instrastate transmission lines has been co-
             ordinated to minimize costs and increase electrical reliability-       Power gen-
             erated in urban-metropolitan coastal areas is generally consumed within the

             coastal zone.
                      There is no simple relationship between a transmission facility's cost
             and distan Ice of p.ower plants from the loadIcenters.   In specific   cases,'the
             cost may be increased or decreased by locating a power facility inland rather
             than on the coast. It is important to consider the location of existing load
             centers and transmission lines when examining a   n inland location for a power
             plant. If the transmission lines have'been placed'inland for environmental,
             social, or economic reasons, it may be less expensive to,locate the power plant
             inland. If no such lines exist, it probably would be more economical to locate
             on the coast. There 'are more potential inland sites near load centers (urban

             areas).
                      The cost of transmission facilities varies widely.,
                      Estimating unit cost is made difficult by 1)regional differences
                      in line construction cost due both to labor rates and-the type of

              Communication, Detroit Edison
<pb n="279" />

                                                  259

                    terrain; 2) differences in design at the same voltage rate; and
                    3) rapidly escalating costs [236].
            Two linesIof the same voltage level and length may have,substantial,differences
            ,in cost because one may have to follow an irregular right-of-way, requiring in-
            stallation of costly angle structures and dead end towers, in contrast to lower
            cost tangent towers which can be used  on straight rights-of-way.
                    As is indicated in Table 42 the "capacity of a transmission line at
            any.voltage is'a_function of the length of  the line and its location in.the
            bulk power network."   Figure 29 graphically presents the variations   in power
            capacity with voltage and line length.
                    Transmission 1ines, like other structures, have increased in cost    at
            disproportionately higher inflation rates than the average price indexes.   Over-
            head 765 kV lines are projected in various studies to cost in 1975 dollars be-
            tween.$200,000 and $500,000 per mile, excluding land costs-. It was estimated in
            the Nuclear Energy Center Site Survey (1975) that it would cost about $400,000
            per mile,on the average for the west and east central regions of the United,
            States and $500,000 per mile for the eastern regions of, the United States for
            a 765.kV line'[51].
                    In summary, there is no apparent relationship between transmission line
            cost and proximity to load.centers. Specific site characteristics will deter-
            mine the cost of locating inland versus locating on the coast, and no trends

            have been found at this time.

                        (4)  Land
                    The value of land is a function of the availability of land offering a
            similar mix of resources, and not necessarily a function of,the amount of land
            needed for energy facilities. The coastal zone has unique characteristics and
            features, whose value has often been assumed to be greater than that of an
            equal sized inland property. The value   of theseunique characteristics and
            features result from various demands on  the coastal zone, many of which are in
            competition with one another, such as recreation, tourism, water supply, and
            multimodal transportation (ship and train), The value placed on this land due.
            to its cultural, psychological, and aesthetic resources is greater than the
            value that these physical uses would indicate. For example, a house located
            on a lot on thecoast near West Olive, Michigan costs $60,000 1549). The cost

            Communication, East Central Area Reliability Agreement
<pb n="280" />

                                                             260

                                                         'iABLL 42

                             C6sts and Power Carrying Capabilities of Overhead
                             Transmission Cixcuits

                               Costs are estimated as of January, 1974*

                1.     Voltage: Nominal                                  345kV'        500kV          765kV
                                     Maximum                             362kV         550kV          800kV

                                                                                                      - MW
                2.     Cztpacity: 50 Mile                              1000MW         240OMW        5500,
                                       250 Mile                          -625MW       150OMW        3300YMW

                3.     Land: Route Width                                 150 ft.       1.75 ft.       2,00 ft.
                                  Acres/Mile                              18              21            25

                4.     Line Cost: Million $/Mile East                  0.081          0.151         0.236
                                                             West      0.059          0.113         0.206
                                                          Central      0.051          0.059         0.102

                5.     Terminal Cost: Million $/Line
                        ,excluding transformers)
                                                         50  mile      3.175          4.900         8.700
                                                        250 mile       4.415          6.475         13.S-'-"?O

                6.     Incremental Terminal,Clost
                       (Park less disp6rsed)'Milli,on              $/Line
                                                         50  mile                        0          5.525
                                                        250  mile'                    1.575         10.325

                7.     Transformer      $/MW
                                           Generator Step        Up    1900           1900          1900
                                            Step Down (Auto)           2600           2600          2600

                .8.    Power Losses: Percent of yearly
                       energy delivered per iOO miles                    1.0%          1.0%           1.0%

                   CAUTION:          As of April 1975,these costs, which were derived
                                     from industry reported values              i,n the early
                                     1970's,     appear to be         or 1/3    of their present
                                     value s@.'

                                                                                                [1491
<pb n="281" />

                                                 261

                                              FIGURE 29

                                     TRANSMISSION LINE CAPACITIES

                          5000
                                     THERMAL
                                                   -765
                                        LIMIT

                          4000-

                          3000

                                                        TYPICAL
                                             --500      LOADINGS
                                     T. L.

                     w   2000

                                             345
                          1000       T.L.

                                              -230

                              0.
                                0             100           200            300

                                                  MILES
<pb n="282" />

                                                     262

               of the lot was $30, 000 of which    000 was simple land, value (similar to inland
               land costs) and $25,000 was aesthetic value [549]. The implications of these
               figures are that coastal property is more valuable than non-coastal property
               primarily because of its unique aesthetic resources. The benefits from this
               land realized by the public for aesthetic, recreational, or psychological rea-
               sons versus*the benefits gained by public and private uses for ports and ter-
               minals,'power plant siting, and cooling water are important resource management
               considerations..
                       In summary, although difficult to estimate, the value of coastal land
               is generally assumed to be greater than non-coastal land.

                           (5) Environmental Controls

                                 (a) Air
                       The major air pollutants from the coal-fired power plants are SO  2 (Sul-
               fur dioxide), NO 2 .(nitrogen dioxides), and suspended particulates. The National
               Ambient Air Quality Standards and New Stationary Source Performance Standards
               place restrictions on the emission of these air pollutants. The major tech-
               nological problem for coal-fired power plants has been meeting the SO  2  stand-
               ards and auxiliary to this, particulate emission standards.
                       Two primary ways to meet the sulfur dioxide emission standards in the
               near future are flue gas desulfurization and use of low sulfur coal. In the
               future, fluidized-bed boilers and coal gasification may be important. Flue gas
               desulfurization technology is now in operation on several demonstration coal-
               fired power plants; however, the technology has not proven to be reliable in
               all cases. There are several types of flue gas desulfurization systems: wet
               limestone, dry limestone, magnesium oxide, catalytic oxidation, double alkali,
               and citrate systems, among others.
                       Environmental Protection Agency information in Table 43 shows the lat-
               est estimates of cost for different flue gas sulfur control technologies, ar-
               ranged by size of power plant. The Table shows that the cost is between 2.7
               and 4.2 mills per kilowatt-hour for limestone flue gas desulfurization, cur-
               rently the least expensive of the technologies [336].
                       The other major method of controlling sulfur emissions is through the

               use of low sulfur coal. There are two sources of low sulfur coal: the western

               states and the Kentucky-West Virginia region. Most of of the West Virginia and
<pb n="283" />

                                                                                          Table 43
                                                         SUMMARY OF TOTAL AVERAGE ANNUAL REVENUE REQUIREMENTS OF
                                                             FIVE LEADING FLUE GAS DESULFURIZATION PROCESSES
                                                                                      1978 Cost Basis,

                                                                                                                                                             -i b
                                                                                                            Total average annual rovenue requirer.,cntsz
                                                                      YLars        Limestone                   Lime              Magnesia                 Sodium                ca'.-Ox
                                         Case                           life   -M $     Mills/k@@         $ @Jills/kllh       M $ Mills/kWh          M $ Mills/kWli         M $ Mills/kMn

                    Coal-fired power unit
                      90% S02 removal; onsite solids disposal
                         200 XW,  new, 3.5%   S                          30      5,883      4.20        6,362      4.54       7,036      5.03        9,238      6.60        6,000      4.29
                         200      existing,   3.57 S                     20      5,686      4.06        7,150                 7,257                10,868       7.76        8,263      5.90
                                                                                                                                                                6.34      17,765       5.09
                         500 @W,  existing,   3*.5% S                    25    11,854       3.39      14,528       4.15     14,052       4.01      2@'189
                         500 @@W, now, 2.0%   S                          30    10,625       3.04      11,145       3.!8     11,572       3.31      14,549       4.16      12,681       3.62
                         550 K.4, now, 3.5%   S                          30    11,937       3.41      12,758       3.65     14,082       4.02                   5.37      12,766       3.65
                         5CO M,,T, new, 5.0%  S                          30    13,105       3.74      14,377       4.11     16,448       4 * 70    22,858       6.53      12,844       3.67
                                                                                                                                                   38,813       5.54      31,133       4.45

                                                                                                                   3.40     23,169       3.3,
                          ,000      cxistinp,3.5% S                      25    19,711       2.82      23,819
                         1,000 MW, new, 3.5% S@                          30    19,163       2.74      20,570       2.94     22,789       3.26      31,1S6       4.46      20,534       2.93
                                                                                                                                                                                                   ON
                      80' SO? removal; onsite     solids disposal                                                                                                                                  LJ
                         500 'e'U, new, 3.5% S                           30    11,319       3.23      12,206       3.49     13,406       3.83      17,425       4.98
                      90X S02 removal; onsite     solids disposal
                         (existing unit without existing
                         particulate collection facilities)
                         500 @'N, existing, 3.5% S                       25    14,376       4.11      14,826       4.24     16,639       4.75      24,995       7.14      19,480       5.57

                      Power unit oln-stream time, 7,000 hr/yr.         Midwest plant location, 1978 revenue requirements.            Investment and revenue requirements for disposal
                      of flyash excluded.
                      Th.ese revenue rccluiremonts reflect capital investments shown in Table I (updated); byproduct credit and sludge fixation costs excluded.

                                                                                                                                                       3361
<pb n="284" />

                                                       264

               'Kentucky low sulfur coal is used for metallurgic processes although some has
                been.used in the Midwest by power plants."
                        The cost of westernlow sulfur coal,,the major source of low sulfur
                coal for the Midwest utility market, is projected to increase at 3% per year
                between 1975 and 1980. After 1980, the price is expected to remain relatively
                constant.   The cost of transporting coal has been a major component of this
                increased cost. This cost has roughly increased three to four dollars a ton
                more than the figures reported in the coal transportation section (Section
                IV.B.2.a).   The cost of flue gas desulfurization, on the other hand, has re-
                cently stabilized and is not expected to increase as rapidly as in the past.
                        The price of western coal depends upon several parameters; the cost of,
                transDortation, profit margins on low sulfur coal, whether air pollution stan-
                dards are enforced on time and without variances, the capability of mining and
                transportation facilities to expand, and others.
                        An Argonne National Laboratory study on the differential in cost be-
                tweeh low sulfur coal and flue gas desulfurization. found it to be less than one

                mill per kwh, with low sulfur coal being slightly cheaper.     Due to this small
                variation in the cost differential between the two majorsulfur controls, the
                method which will be used depends upon site characteristics affecting the trans-
                portation, origin, and destination of coal, duration of contracts, and company

                policy.
                        There is an interrelationship between the cost of SO removal and par-
                                                                               2
                ticulate removal. For example, the use of certain low sulfur coal will in-
                crease the emissions of particulates, and the cost of particulate removal.
                        Another method for reducing sulfur emissions is physical and chemical
                coal desulfurization. When used with medium sulfur content coal, the resulting
                fuel can meet existing standards. The availability of medium sulfur coal re-
                strirt-9 the use of this method (14% of  the United States reserves) [2191.

                                (b) Waste disposal
                        Coal-fired power plants produce large quantities of solid waste; out of
                a ton of coal delivered to the plant, 10 to 30 percent is residual waste, main-
                ly in the form of fly ash. Coal with an ash content of 15 percent would.pro-
                duce approximately 40 tons of waste per hour or approximately 250,000 tons a

                  Communication, Argonne National Laboratory
<pb n="285" />

                                                     265

           year for a 1000 MWe power plant.      A large land area (100-133 acres) filled to a
           depth of 25 feet is necessary'for     disposal of the waste over a 35-year useful
           life for a 1000 MWe plant [2211.        In recent years, fly ash has been sold as
           filling material on local markets     for asphalt and structural fills or embank-
           ments.     In the United States in    1974, 16.3% of the fly ash was sold at prices
           ranging from two dollars a ton to     as much as six dollars a ton, depending on
           the market supply and demand and the region.          In the future,, scarce metals
           such as magnesium,'chromium, titanium, and vanadium may be extracted from the

           ash.

                   ,A power plant located near the coast may transport the waste to an in-
           land location for disposal. The mode of transporting the waste inland varies,
           but tenerally pipelines or trucks are used. "The tariffs currently approved
           by the Michigan Public Service Commission for transporting fly         ash  are 690,/ton
           for up to five miles and $1.32/ton for distances up       to 5-20 miles."        The
           transportation cost is only one     of the costs associated with transporting the
           waste to an offsite location. The other is the incremental cost (the extra
           cost above onsite disposal costs) for extra onsite or offsite preparation, dis-
           posal, and storage of waste.
                   "Annualized costs for waste disposal, a diffi-cult problem,, ranged         from
           $1.00 to $7.00 a ton, and $3.00 a ton is used" [432]. Information from Detroit
           Edison shows the total cost of transporting fly ash wastes and disposing of

           them offsite to be as follows:

                   A.   Dry storage in silos and trucking to offsite disposal area.
                        Assume sufficient silo capacity for three-day storage.

                        Levelized Annual Cost: $3.96 per ton, 5 miles to disposal site
                                                   $5.02 per ton, 20 miles to disposal.site'

                   B.   Flyash from hoppers mixed with water and pumped to small on-
                        site reservoir. Dewatered sludge removed and trucked to off-
                        disposal area every two years.
                                                   $2.64 per ton, 5 miles to disposal site
                                                   $3.71 per ton, 20 miles to disposal site

                   C.   Flyash from hoppers mixed with water and pumped directly to
                        permanent disposal site.

               Figures  were reduced from a 3000 'MWe plant, which would require 300-400 acres'.
               Electric  World, May 1, 1976; Volume 185, Number 9.
               Communication*, Detroit Edison.
<pb n="286" />

                                                      266

                           Levelized Annual Cost: $2.53 per ton, 5 miles to disposal site
                                                   $3.32 per ton,, 20 miles to disposal site

                       It sh'ould be noted that these costs are actually costs per
                       ton of fly ash produced. The increased tonnage of ash-water mix"
                       tures or any additional costs due to lime/sulfur slurries have
                       not been estimated.
               The differential cost per ton of disposing the fly ash offsite as opposed to
               onsite is the cost per ton of offsite disposal (as in the chart above) minus
               the onsite d4sposal cost per ton. The major costs contributing to this differ-
               ence are those for transportation, onsite equipment, cost of disposal site, and
               site preparation.    The cost of onsite disposal of fly ash varies from site to
               site and depends upon land costs, selling price and alternative uses for fly
               ash, and transportation and storage costs.

                       If limestone scrubbers are used for the removal of SO      residual waste
                                                                              2
               volumes will be expanded by one to two times the present amount    each year [231].
               Special problems will be.encountered in disposing of the sludge    from limestone
               scrubbers. Sulfur removed from the gas can be sold at up to $15.00 per ton
               [432]. '.'The EPA has estimated that sludge for a 1000 MWe coal-fired power plant
               [assuming three percent sulfur, 12 percent fly ash, 6,400 hours/year operationj
               will require 269 acres for solid waste disposal or 377 acres necessary includ-
               in g fly ash" [4321.  "As a rough guide, EPA believes that if the cost of sludge
               disposal exceeds $4.00 to $6.00 a ton [wet basis], a regenerable process which
               covers a useful byproduct will be more economical than a nonregenerable pro@
               cess" [432]. In many instances, the preliminary data which EPA compiled on
               disposal waste indicated that offsite disposal is cheaper than onsite disposal
               [432]. In reality, the costs associated with offsite disposal depends upon
               specific site factors and regional conditions.
                       In summary, waste disposal with limestone scrubbing could be-a major
               problem.in terms of land required. There is no obvious pattern related to the
               extra cost associated with offsite disposal as opposed to onsite disposal.

                       c. Nuclear Power Plants

                           (1) Fuel Transportation and Storage
                       While the cost of transporting fuel can have a major effect on the 10-
               cation of a coal-fired power plant, this same factor has but a minor effect on

                 Communication, Detroit Edison.
<pb n="287" />

                                                                                                     267

                    the location of a nuclear power plant [50].
                                    The cost of transporting nuclear fuel is approximately $4.00 to $5.00 per
                    kilogram of uranuim, or only one to two p                                          ercent of the total costof fuel.
                                    Table 44 shows that the transportation requirements for nuclear power
                    plants are low over the entire nuclear fuel cycle.
                                    The implications of risk and impact on coastal waters from'the,trans-
                    portation of nuclear materials is out of the                                               scope of this report; however.' the
                    implications are extremely important and deserve further examination.

                                                                                             TABLE 44
                           ANNUAL SHIPMENTS OF RADIOACTIVE MATERIALS TO AND FROM AN OFFSHORE NUCLEAR
                                             POWER STATION (One 1100-MWe Pressurized Water Reactor)

                                                                                                  Approximate number of shipments per year
                                                               Operation
                                                                                                     Barge                          Land

                                                   Fresh  (unirradiated) fuela
                                                          1. Fuel fabrication plant to                                    6 trucksb
                                                          shore transfer point
                                                          2. Shore transfer point to             1 to 2 bargesc
                                                          offshore power plant
                                                   Spent  (irradiated) fueto
                                                          1. Offshore power plant to             2 to 5 bargesc
                                                          shore transfer point
                                                          2. Shore transfer point to                                      60 trucks or 10 rail cars
                                                          fuel reprocessing facility

                                                   Solid radioactive wastes
                                                          1. Offshore power plant to             2 to 5 bar9W
                                                          shore transfer point
                                                          2. Shore transfer point to                                      46 trucks or 11 rail cars
                                                          licensed radioactive waste
                                                          disposal facility
                                                          aThe shipment of .2mpty casks        for fresh and spent fuel will req           uire
                                                  essentially the same number of shipments as the number of loaded casks
                                                  indicated in the table. However, the radioactivity hazard will be negli-.
                                                   gible.
                                                          b1nitial loading of reactorrequires about 18 truckloadsof unirradiated fuel. Shipment
                                                   of unirradiated fuel by rail is usually ruled out because of length of transit time.
                                                          'Number depends on capacity of barge.                              [5621

                                            (2) Cooling Systems
                                    A major determinant in the location of nuclear power plants is-the cost
                    of providing a cooling medium. Water is the primary natural resource used as
                    a cooling medium, although air can also be used. There are different. costs in-
                    volved in providing cooling water to coastal and inland locations.
                                    As was the case with coal-fired plants, both capital (costs of building
                    and of the components of the system) and operation and maintenance costs must
                    be considered. The use of more sophisticated cooling systems results in
                    greater losses in efficiency and capacity, and increased auxiliary power                                                                             con-
                    sumption than the use of once-through cooling. Table 45 shows that the                                                                            ef-
                    ficiencies for nuclear power plants vary with the cooling method. Table                                                                            46
<pb n="288" />

                                                                                    268

                                                                              TABLE 45
                                              COOLING MODE. EFFECTS ON NUCLEAR PLANT EFFICIENCY

                                                                                                      Typical       Nuclear
                                 Cooling Mode                                                         Plant Efficiency

                                 Evaporative       Natural Draft Tower                                          32.7
                                 Evaporative       Mechanical Draft Tower                                       32.6
                                 Cooling Pond                                                                   32.8
                                 Once Through (River)                                                           32.9
                               .Dry Tower - Mechanical Draft                                                    28.1
                                 DryTower - Natural Draft                                                       28.6
                                                                                                         Source: [149]

                                                                         Table 46

                                      ..COQLINC,.MODE EFFECTS-ON FOSSIL/NUCLEAR PLANT OPE.RATION

                                                               F01SSIL/HTGR - 800 MW                               BWR/PWR - 1000 RW
                                                      Once                Wet                  Dry       Once             Wet              Dry
                                                      Thru       Mechanical Natural          (Mech)      Thru     Mechanical  Na Lural     (Mech)

                  Lost Capacity

                       (Due to Higher Back            Base             1%          1%          9%        Base         1%         1%      15%-PWR
                        Press).                                                                                                          1-7%-13WR
                  Loss in Efficiency(l)

                       (Increased Heat Rate)          Base             1%          1%         10%        Base         1%         1"/     -M-PWit
                  Auxiliary Power(P                                                                                                      17%-BWR

                       Consumptien                    Base           0.5%         0.25%     1.25%        Base       0.8%        0.4%      2%
                  La nd Requirement  (2)

                       (Acres)                                        3-5         2-3         5-7                   5-7         3-5     7-10

                     (1)Bsed on various reports, studies, and manufacturer's information
                     (2) These land requirements are. for comparative purposes only, not to calculate total station land needs.
                                                                                                                                               [1491

                     shows    losses in       efficiency and capacity               and   the increase in auxiliary powercon-
                     sumption due to          various cooling systems. These losses are reflected in higher
                     operation and maintenance costs.
                                 The capital costs in Table.47 were compiled for various cooling systems
                     from an Atomic Energy Commission report                        [308].. Historically, as shown in the
                       Iable, once-through cooling has been the                      least expensive cooling method.
                                 The cost figures given in Table 48 show comparisons among alternative
<pb n="289" />

                                                                              269

                                                                        TABLE 47

                                     ESTIMATED COSTS OF TWO-UNIT                 [130OMWe EACHI.LWR PLANT
                                                     WITH ALTERNATIVE COOLING SYSTEMS
                                   (cooling Systems. Cost i           .n.Brackets for One-Unit [1300 MWe'j
                                        LWR Power Plant with Alternative Cooling Systems)

                                                                             Increased Capital costs
                             Once-Through cooling                            Above 'Once-Through Coolirrg
                                Capital  costsa,                        1410          BASE
                                Dollars per kilowatt   b                542           BASE

                             -Wet Natural Draft cooling Towers
                                Capital costs                           1434          24+
                                                                        [7221
                                                                                      ll+
                                Dollars  per  kilowatt                  551
                                                                        [5561

                             Wet Mechanical Draft Cooling Towers

                                Capital costs                           1406          -4

                                Dollars per kilowatt                    541           -1

                                 a
                                   Capital costs millions of dollars mid-1974 dollars for a plant finished in'1981
                                 b Capital costs in dollars per kilowatt of plant capacity

                                                                                                            [3081

               cooling systems          for nuclear power plants [511. The figures                          in the table        are
               updated to 1975         dollars from 1973 dollars in the manner explained at the                                  bottom
               of the table. The line indicating "Evaluated Present Worth of Cooling Systems,
               millions of Dollars" shows the capital costs and "Increase in Generation                                          Costs,
               Mills per Kilowatt-hour" is the operation and maintenance costs.
                           Once-through cooling is the least expensive system but currently is                                       not
               used on new plants unless a variance is granted under Section 316(a) of the
               Federal Water Pollution Control Act Amendments of 19,72.
                           As the data shows, wet natural draft towers, wet, mechanical draft towers,
               and spray canals are all competitive alternative cooling systems depending upon
               the site location. Further discussion of this §ubject is presented under Sec-
               tion IV.A.5.b.(2)          of this report.

                                 (3) Electrical Transmission Systems

                           No discernable         differences       between      eldctrical transmission              'lines for
               nuclear power plants versus coal power plants''could be:detedted. For dis-
               cussion see Section IV.A.5.b.3.
<pb n="290" />

                                                                                             TABLE 48

                                              COMPARISON Or COSTS AND EFFECTS ON NET CAPABILITY FOR 1200-MWe NUCLEAR GENERATING UNIT
                                                                                  USING ALTERNATIVE COOLING SYSTEMS
                                                                                            (1973 COST DATA)

                                                                                                         Evaporative Cooling.                                 Dry Cooling
                                                                               Once-          Mech.            Natural                 Spray             Mech.                NaturaT
                                                                               Through        Draft             Draft        Pond      Canal             Draft                 Draft

                   Plant Capability at Design                                  1,200          1,177             1,170        1,159     1,156             1,022                 1,029
                     Conditions, Megawatts

                   Pumping Power Requirements,                                      4.8            9.5            10.2           6.5       11.6              5.1                   5.5
                     Megawatts

                   Fan Power Requirements,                                        -                5.0            -                        -               21.6                  -
                     N.egawatts

                   Cooling System Capital                                          18.0           23.6            25.5          43.4       21.8.            40.11                49.1
                     Investment, Millions of                                      21.6          28.32            30.6          52.0        26.16           48.12                 58.92
                     Dollarsa

                   Evaluated Present Worth of                                      38.3           72.6            72.1        105.7        78.1           235.2                  225.8
                     Cooling Sy@tem, Millions                                   49.79           94.38            93.73       137.41      101.53          305.76
                     oil Dollarsu                                                                                                                                               293.54

                   Increase in Generation Cost,                                 Base               0.36            0.36          0.72      0.42               2.09                1.99
                     i'Mills per Kilowatt-hourc                                                   .576            .576        1.152         .672           3.344                 3.184
                   Nctc: For approximate correction to Ja nuary 1975 costs multiply by factors as indicated.

                   aCooling System Capital x 1.2.
                   bEvaluated Present Worth x 1.3.
                   cGeneration Cost x 1.6                                                                                                                              [5 11
                   These corrections are approximate based on NECSS study assumptions of:  (1) 30 year unit life;  (2) 10% discount rate; (3) 15 mill value of replacement
                   power; (4) 2M increase in capital cost; (5) 70% capacity factor.
<pb n="291" />

                                                 271

                       (4) Land

                   No discernable differences between land or land value for nuclear power
           plants versus coal power plants could be detected. For discussion, see Section

           IV.A.5.b.4.

                       (5) Environmental,Controls
                   "It is recognized that there exista number of controversial issues re-
           garding the safety-environmental-public health aspects of nuclear,power plants
           and accompanying fuel cycle operations" [1481. This section.is concerned only

           with the cost of environmental controls which affect site location and resource

           utilization in respect to the coastal waters.
                   The cost of controlling accidental releases of radioactive material in-
           to the coastal waters or land through plant operation and f-uel transshipment
           would not affect the location of a nuclear facility [50, 148].
                   Radioactive material is stored on the site of a nuclear power plant.
           Irridated spent fuel elements.require the strictest containment due to their
           extreme toxicity and radioactivity. The storage of such material is not a
           significant cost in locating a power plant [148].
                   The irridated spent fuel elements may, in the future, be transported to
           .regional reprocessing plants. These reprocessing plants may receive shipments
           by truck, railroad, or barge.

                   It is beyond the scope of this report to consider risks and impacts of

           these activities on the coastal zone or waters. However, it is recommended
           that future research be conducted on the impact of these activities on the
           coastal zone and waters, especially in respect to possible barge shipment of
           irridated spent fuel to reprocessing plants.
                   In summary,.while an initial evaluation indicates the costs associated
           with nuclear power plants' environmental safety are not a significant factor
           in determining site location, more detailed research on both impacts and costs

           in relation to coastal waters would be beneficial.

            Role of Transportation in the Nuclear Fuel CycleL Energy Research and
            Development Administration presented at the July meeting of Michigan Envi-
            ronmental Review Board.
<pb n="292" />

                                                   272

                     d. Fuel Transshipment and Storage Facilities

                          (1) Introduction
                     In the following discussion, only coal transshipment and storage fa  cili-
             ties are considered, because the potential magnitude of their possible effects
             on the Great Lakes coastal zone is the greatest. The capacity.of coal trans-
             shipment and storage facilities in the Basin varies from 2,000 tons of coal per
             year to as large as 20 million tons of coal per year.
                     This section examines the cost of a fuel transshipment a nd storage  fa-
             cility where the storage pile is inland from the port. The cost of transpor-
             ting coal inland by conveyor belt for the distance of five miles is 5.4 cents
             per ton mile.   The cost of moving 5.6 million tons of coal per year (the
             amount needed for two 1000 MWe power plants) one mile is $302,40b. It is un-
             likely that coal would be transported only one mile inland to a storage area,
             due to the high cost of handling for short transport. It is,more reasonable    to
             assume that coal.would be transported longerdistances.

                          (2) Land.
                     Coal may be transported inland to conserve the use of coastal proper-
             ties. In general, a coal transshipment and storage facility maintains a 90-day
             supply; this.varies depending upon the accessibility of the facility to incom-
             ing coal during the winter. The amount of land required to store a 90-day sup-
             ply of coal (1,400,000 tons for two 1000 MWe power plants) at 30-40,000 tons/
             acre is 30-40 acres.. Approximately one to two acres would-be necessary for
             transient storage. A transient storage area at the port is necessary because
             it is uneconomical for a conveyor belt several miles long-to have a transport
             capacity equal to the rate at which a barge.or ship may be unloaded.
                     In summary, transporting coal inland saves only about 28-38 acres of
             coastal land for a facility with a capacity of 5.6  million,tons per year.

                     e. Refineries

                     As was indicated.in the discussion of refinety site requirements and
             considerations in Section IV.A.3, the economics of refinery location is a com-
             plex issue that must be. considered at a national level. For example, an

               The cost data is based on the analysis in Coal Fuel Transportation and
               Storage (Section IV.A.5.b.l.)
<pb n="293" />

                                                    273

           analysis [in 312 based on material from 370] compares costs of supplying re-
           fined products to the east coast from refineries located on the east coast,
           the Gulf,Coast, and offshore (i.e., outside of the U.S., such as the Carr ibbean.)
           As the figures in Table 49 show, the cost of refined products on the east coast
           (Petroleum Administration for Defense, PAD, District I), is lowest if the crude
           oil is refined outside of the United States and shipped to the market area.
           While this is only one example, it does indicate that an evaluation of refinery
           economics must be done at a supraregional scale.

                   f. Facility Cost Discussion
                   This section is a summary of previous     economic material on coal-fired-
           power plants, nuclear power plants, ports and     terminals, and refineries. Table
           .50 is a matrix summary of economic material compiled in the previous sections.
           The assumptions of the cost data are listed in the footnotes. It is important
           when using this material to review the footnotes, and to keep the material in
           context by reviewing the section where it originated.
                   The first column titled "Land" reflects the average amount of land that
           coal-fired plants, nuclear power plants, and refineries occupy. The categories
           for the different cooling systems under nuclear and coal"fired power plants

           show the average amoung of land different cooling systems occupy.
                   The."Plant" column reflects plant capital costs for the different fa-
           cilities. It is important to note the size and capacity of the nuclear and
           coal-fired power plants as they differ from our idealized 100OMWe power plant.
                   The "Cooling System" column indicates two sections--water provision and
           plant system.. The water provision section indicates that both capital and
           operation and.maintenance costs for conveying water to a cl6sed-cycle cooling
           system are less expensive than to a once-through cooling system. The plant
           system indicates that both capital and operation and maintenance costs are
           more expensive for closed-cycle cooling than once-through'cooling. The cost
           of locating a power plant inland versus on the coast depends'upo,n many site-
           specific factors and different configurations of the components of the cooling

           systems.,
                   The fuel column is divided into three sections: short haul transport      . a-
           tioh, long haul transportation, and storage. The short haul transportation
           section indicates that the cost of moving coal one mile inland from a fuel
           transshipment and storage facility is not exceedingly expensive. The long
                                                                (continued on page 277)
<pb n="294" />

                                                         274

                                                        TABLE 49

                              COST OF SUPPLYINGREFINED PRODUCTS TO THE EAST COAST
                                        FROM ONSHORE AND OFFSHORE REFINERIES

                                             ($/bbl of product in 1985)

                                                                       Origin of Supply

                                                                      Onshore

                                                              EAST             GULF                a
                               Cost Component                 COAST           COAST        Offshore
                    .Crude oil in Persian Gulf   b              2.65           2.63          2.69
                     Transportation and terminalingc            .1.28          1.21          1.00
                     Duty-                                      0.11           0.11
                     Operating costs                            0.48           0.45          0.38
                     Product transportation                                    0.51          0.27
                     Interest on working capital                0.08           0.08          0.10
                     Marketing expense                          0.05           0.05
                     Income taxesd                              '0.52          0.05          0.05
                     Return on refinery investmente             0.90           0.79          0.90
                       Total (15% 'DCFf rate of return)         6.079          6.28          5.68
                       Total (10% DCF rate of return)           5.58           5.85      L   5.42

                        aThe tabulation of    "Costs shown  in this table for an   offshore re-
                     fineryis not based on any particular location, nor are there currently
                     arly'offshore refineries making the assumed "balanced" District I slate
                     of products. -Current offshore refineries are of the hydroskii1ming type,
                     Leeding mixtures   of low-sulfur and high-sulfur crude, primarily p.@odUC7
                     ing fuel oil for the U.S. market.* Consequently, these costs are not
                     intended to display actual circumstances of current offshore conditions.
                        b
                         Prices of crude oil in the Persian Gulf are the same.          Figures in
                     the table differ because they are expressed in dollars per         barrel of
                     proC1uct, and product yields vary from location to location. Costs in-,
                     clucle bu@ane purchases and   Iexclude cost of acquiring import quota.
                        c
                         Shipping at.Worldscale 70 rates. Oil moves to District I by vlcc
                     to -=- Caribbean te rminal and thence by barge to the United States.
                     District III uses vlccs and a man-made deepwater port.
                         Forty-eight percent tax rate onshore and zero offshore. It is
                     assumed that a.refiner offshore will make full use of tax concessions.
                        eFifteen percent rate of return. Return is related to estimated re-
                     finery investments. Offshore refinery investment included a power plant,
                     which onshore refineries do not have.
                        fDiscounted cash flow.
                        gCosts are in 1972 dollars.
                                                                               [SOURCE    3121
<pb n="295" />

                                                                                                               TABLE 50
                                                                                               IV 4a(3) FACILITY-COST MATRIX
                                                                                         For Facilities 1'Mile ILL-LCULU                       VI

                                                                                                                                                          PRODUCT         ENVIRONMENTAL
                                                               LAND VT       V1 PLANT             COOLING SYSTEM                        FUEL              DISTRIBUTIOR        CONTROLS -
                                                                                                                                                                     VT                     UT
                                                                                               WATER               PLANT
                                                                                               PROVISION           SYSTEM

                                                                                                                                                      00
                                                                                                        Ca a)            CO a)     V)          U)     co
                                                                                                        U      -4          W      WC        to a      P
                                                                                               M        600                C:     0co       a  Ca     0                               'A
                                                                                               "        0W                 0      CP        0  W                                      0
                                                                                                        -4 r,. -,4         V                                                                0
                                      FACILITIES                                               Q@W      (U     ln@ 0       a)
                                                                                               (ao      M41    10  0     cqsv   (Per        (P
                                                                                               U3       $40    U   U                           r      VI
                                                                                                                                Year)       Year)
                                                                                                                         0
                                                                   (I)v        (2)             (3)
                                                                                                  __C4)_       (5)       (6)      (7)       tA VI     (10)]               12)111
                                                                                                        IV         11    IV       111       11        1       111         IV        11
                            COAL POWER PLANTS:                 1.45-2000
                               Once-Through                        &gt; 1         945             10,00(   .317 34.4        0      151.2   5.6-28        25     116,667+     2.7 --- 2.50      ---
                               Nat. Draft Tower                    _10                         06(      .0089 64.7       .397   151.2   i.6-28   15-20       116,667+
                               Mech. Draft Tower                   45                          f?86(    .0089 65.'1      .397   151.2   5.6-28   15-20       116,667+     5 2       1  75   ---
                               Spray Canal                         100                         f?80-(   .0089 70.1       .462   151.2   5.6-28   15-20       116,667+
                               Cooling Pond                        2000                        ?
                                                                                               1?86(,   .0089 94.8       .794   151.2   5.6-28115-20         116,667+
                                                                   _T_         It                 -TV- ---IT--- ---TV-
                            NUCLEAR POWER      PLANTS:         (84-30j50(                                                                   (9)              (11)
                                                               1,10OAve',
                               Once-Through                          1         1410,           10,00(   .396 49.8          0      ---       234       ---    116,667  - --- --- --- ---
                                                                                               250-
                               Nat. Draft Tower                    10                          1 00(    .0112 86.5     .576       ---       234       ---    116,667  - --- --- --- ---
                                                                                               W-
                               Mech. Draft Tower                   45                          1,00(    .0112 94.4     .576       ---       234       ---    116,667  - --- --- --- ---
                                                                                               250-
                               Spray Canal                         130                         1,00(    .0112 93.7      .672                234       ---    116.667  - --- --- --- ---
                                                                                               250-
                               Cooling Pond                        2600                        1,00(    .0112  126.9  1.152       ---       234       ---    11.6,667 - -- --- --- ---

                                                                   (16)     ll-(17)               Vill                                                       VIT
                              REFINERY                         1,500           200                      (20@                                                              16)(18)           ( i)-
                                                                                                  33    -                                                    1.24         .4-3.9-
                                                               2,700           815                      R7 6                                                              3.4 22.   1       ?.75
                                                                                                                               I-
                              (COAL) FUEL 'TRANS-                                                                               %5)
                              SHIPMENT &amp; STORAGE                                                                                302              35-45
                               lFigures in acres                                 V Footnotes on following pg. for            numbers                  VII Dollars per barrel [312)
                              11 Figures in millions of            dollars         in ( ) brackets                                                    Vill Total plant, million $/yr.
                             III Figures in thousand of            dollars     VI  This factor would not be substantially affected
                              IV Figures in mills per kwh                          by location on coast or one mile inland
<pb n="296" />

                                                      276

                 Footnotes for Table 50.

                 1  The figures for land requirements include the requirements for different
                    cooling systems except for cooling ponds. The land requirements for cooling
                    ponds and spray canals for coal-fired power plants were adapted from nuclear
                    power plant requirements at the lower Btu/kWh heat rejection rate (77% of
                    a nuclear power plant)-for coal-fired power plants. The other cooling sys-
                    tems, it is assumed, would not use appreciably more land for fossil-fuels
                    than for'nuclear.

                 2  These figures represent different plant capital costs in millions of dol-
                    lars for a two unit [1300 MWe each] power plant. These costs are from a
                    different source than the cooling system costs and are in mid-1974 present
                    value dollars. These figures do not include fuel,costs, operation and
                    maintenance costs, or sulfur dioxide controls [308].

                 3  The capital costs are presented in 1976 present value dollars for conveying
                    water one mile inland for a 1000 MWe plant. See section on Water supply
                    (Section IV.A.b.(2)(b)), for detailed limitations on use of figures. The
                    capital costs for water supply do not consider the type of facilities which
                    could be used on the coast versus inland and should be 'Used with caution.

                 4  The operation and maintenance costs are in mills per kilowatt hour in 1985
                    dollars projected from 1972 dollars for a 1000 MWe plant, assuming a height
                    increase of 3 feet for one mile inland distance.

                 5  The capital cost figures are represented in 1975 present value dollars for
                    a 1200 MWe plant. The coal-fired power plant figures are adapted from the
                    nuclear figures by using the lower heat rejection, 77% of a nuclear power
                    plant, for a coal-fired power plant.

                 6  The operation and maintenance costs are  in 1975 dollars in mills per kWh.
                    See section on Cooling Systems [Section  IV.A.b.(2)], for limitations on use
                    of figures.

                 7- The figures in the short haul transportation of fuel for coal assume a
                    1000 MWe plant using 2,800,000 tons of coal per year: the amount of western
                    coal a power plant would use in a year. The short haul transportation
                    figures assume moving coal one mile using conveyor belts at 5.4(,, per ton
                    mile. Coal would not be moved just one mile 'at this cost due to high
                    handling costs.

                 8  The long haul transportation figures.assume moving 2,800,000 tons of coal
                    a distance ranging from 250 miles to  1400 miles, assuming approximately
                    seven miles per ton per mile.

                 9  The cost figures for transporting nuclear fuel for a 1000 MWe nuclear plant
                    assumes the cost of 46,800 KgU of fuel per year is between $4.50 to $5.54
                    per KgU or an approximately average of $5A0 per KgU in 1976 dollars.
                 10 The land acreage needed for storage at a coal power plant assumes 90-day
                    supply of coal and 30-40$000 tons/acre,
<pb n="297" />

                                               277

         11  The cost figures are for a.1000 MWe plant assuming a quarter of the cost of
             a 765 k'7 line with a 4000 MWe line capacity in 1976 dollars.

         '12 The cost for sulfur dioxide controls, the.principal air pollution control,
             are figured from costs that range between 2.7 to 4.2 mills per kWh.

         13  The costs for fly ash disposal, the principal solid environmental control,
             are figured from a volume of 250,000 tons a year fly ash wastes for a
             100.0 MWe plant at one to seven dollars a ton di-sposal costs. The costs and
             volume will increase one to two times if limestone desulfurization pro-
             cesses are used.

         1-4 Th e.figures for land requirements.for fuel transshipment and storage are
             for the principal use of these'facilities--coal. The land requirements
             are only the area necessary for storing 1,400,000 tons of coal.

         15  This cost figure for short haul transportation of coal is based upon 5.4
             cents per, ton per mile, and 5. 6 million tons of coal transported per year.
             Coal would not be moved just one mile at this cost.due to high handling
             Costs.

         16  Depends on capacity. Figures given are from refinery description section..

         17  Based on minimum and maximum figures found in literature and size varies
             from 100 to 250 MBD.

         18  Based on figures from [370] cited in [312].

         19  Noise and light control.

         20  @ $1.052/bbl IL312] -- encompasses estimates in [506].

         (continued from page 273) haul transportation section indicates that the cost
         of transporting coal fuels versus nuclear is many times more expensive on a per
         unit basis. The cost of transporting coal can-have a significant effect on the
         location of a coal-fired power plant. Refinery site location costs, though no
         figures are listed, are significantly affected by existing pipeline location.
         New refineries will locate near existing or proposed crude oil pipelines. The
         storage section indicates the approximate number of acres the-facilities re-
         qiJire for oil storage.
                 The "Product Distribution" column indicates the cost to power plants
         and refineries for distributing their product, electricity and oil, to cus-
         t-omers. The cost,of product distribution frompower plants is an important
         site location factor, but not necessarily a coastal dependent factor. The cost
         of product distribution from refineries is not an important factor in
<pb n="298" />

                                                     278

                determining site location.
                        The "Environmental Controls" column reflects the cost to facilities

                for air  water, solids, noise, and light controls, The important environmental
                cIontrol in relation to site location is air. The air quality can affect both
                the location of refineries  and coal.p9wer' plants due to the ambient air quality.
                Refinery location can also be affected by light and noise intrusion,,especially

                in relation to residential  communities.

                        In summary, this section has highlighted those factors which affect
                site locationand coastal dependency. These important general factors affect-
                ing site location.are often mitigated by specific site location factors. The
                specific site location factors, as is  shown in the Pleasant Prairie Case Study,
                in Section IV.6, and.the discussion of coastal dependency can be more important
                in determining site location in respecf to the coast than.general site location

                f ac to rs.,
<pb n="299" />

                                                 279

             @6. DISCUSSION OF COASTAL DEPENDENCE AND CASE STUDY

                  At the outset of this discussion on  the environmental and economic factors
          affecting the siting of energy facilities the following definition of "coastal
          dependence" was adopted:
                  The determination of energy facility'location with''respect to  the
                  lakeshore is expressed through the.following general considerations:
                  system requirements, safety, engineering, environmental, institutional,
                  and economic.

                  The breadth of this definition indicates that the analysis must go beyond
          simple evaluation of factors related to coastal locations, to a more general
          examination of facility location. 'Retaining thelakeshore as a reference point,
          however, puts the analysis into a coastal-versus-inland framework. This defini-
          tion thus provides sufficient latitude to identify the trade-offs between coastal

          and inland site locations.
                  This analysis.will provide a discussion'of the general and specific
          factors related to both coastal.and inland sites, highlighted by examples from    a
          specific facility proposal. In selecting the facility to be used as an example,
          the following criteria were important: (1) i.t.should be one of the facility types
          considered in this study, (2) it should be representative of the approximate size
          of facilities considered.in this study, and (3) coastal and inland location.
          alternatives should have been considered. The facility selected, the Pleasant
          Prairie Power Plant (Wisconsin Electric Power Company) near Kenosha, Wisconsin,
          provides the perfect example for this type of analysis. It is a coal-fired plant
          with an electric output of 1,160 MWe. Furthermore, sites both on Lake Michigan
          and inland were considered during the site'.selection process. A brief description
          of the facility is given below.. The material. used to highlight the discussion of
          coastal dependent and nondependent factors was abstracted from the Environmental
          .Report, Pleasant Prairie Power:Plant, Units 1 and 2 [552and 553j.

                  a. Pleasant Prairie Descr  iption
                  In February, 1975, the-Wisconsin Electric Power Company   submitted an
          environmental report describing its proposed Pleasant Prairie Power Plant Units
          1 and 2, to be built near the town of Pleasant Prairie, approximately four miles
          southwest of.Kenosha, Wisconsin. In the report, information was provided.on the
          proposed plant and site and its environment, the expected environmental impact of
          the project.was asses sed, and a comparative assessment was made of six alterha@
          tive sites. The facility is presently under construction.
<pb n="300" />

                                                      280

                        The plant will consist of.two identical generating units, each of which
               includes a coal-fired boiler, steam turbine and generator, and associated equip-
               ment. The two steam generators will use low sulfur pulverized coal at a rate of
               approximately 380 tons per hour per unit on a normal full load basis. The
               expected net capacity of the plant will be 1,160 MWe, although actual output.will
               vary with amb ient.temperature and relative humidity. The total capital invest-
               ment in the plant and facilities will be $432,672,000, with annual operating
               expenses estimated to be $42,830,000.
                        As of 1975, the Wisconsin Electric Power Company had'not selected a coal
               supplier for the plant. However, it is determined that coal will be received at
               the Pleasant Prairie site by unit train from Wyoming coal fields, approximately
               1,150 miles away-
                        Themain cooling water system will consist of two mechanical draft
               cooling towers rejecting approximately 6.8 x 10 9 Btu/hr to the atmosphere. The
               system will circulate a total of 400,000 gpm across the condensers for both
               units. Makeup water for this sytem will be received via pipe from Lake Michigan
               (approximately 4.5 miles east of the site) at a nominal rate of approximately
               8,660 gpm.
                        Particulate material will be controlled through the use of electrostatic
               precipitators designed for overall collection efficiencies of at least 99.3
               per.cent. The collected fly ash will be moved pneumatically to silos for
               temporary storage before movement to an onsite disposal area. Because the plant

               will use low sulfur western coal it is not expected that sulfur dioxide emissions

               will be a major problem. In addition, nitrogen oxides and carbon monoxides are
               also expected to meet emission standards. To aid in the dispersion of these
               effluents a stack at least 450 feet high will be used.
                        The Pleasan.t Prairie site incorporates an area.of approximately 425.
               acres, of which the principal plant facility will require 210 acres. Figure 30
               depicts the arrangement of the plant and the locations of the related facilities.
               Figure 31 shows the proposed intake and discharge pipe corridor leading to Lake
               Michigan from the site.
                        The six alternative sites considered for this plant include: '(a) the

               Haven site located at former Camp Haven Military Reservation in the northeastern
               portion of Sheboygan County;,(b) the Port Washington site located southwest of
               the company's existing Port Washington Power Plant in Ozaukee County an Lake
               Michigan; (c) the Milwaukee Harbor site situated just north of the mouth of the
<pb n="301" />

                                                 281

          Milwaukee River on existing lake fill; (d) the Lakeside site located between
          @South Lake Drive and Lake Michigan in the City of St. Francis (an existing power
          plant owned by the company is located Just.south of this site);@(e) the Oak Creek
          site located in the southeastern part of Milwaukee County just north of the
          company's existing Oak Creek Power Plant on Lake Michigan; and (f) the Kenosha
          site located just south of the City of Kenosha municipal boundary. Figure 32
          shows all of these sites., including the selected Pleasant Prairie site.
                  In a comparison of the alternative sites, factors considered included the
          following: (1) proximity and suitability.of,both rail and road facilities during
          construction and operation of the plant.; (2) potential for congestion of 'service
          roads; (3) surrounding land use; (4) proximity to population concentrations, and.-
          (5) other factors discussed in the environmental report. In addition, sites
          were evaluated on a combined@economic, engineering and environmental basis.
          Critical factors for evaluation and comparison included site characteristics,
          cooling method, and fuel supply provisions.

                  b. 'Discussion of Coastal Dependence
                  Because this study deals-with the problem of site  selction on a nonsite-
          specific basis, it is impossible to identify those factors  favoring a coastal site
          over an inland,site or vice versa.. Instead, at the level of this analysis there
          is 'a conftnuum of@coastal dependence or nondependence, running from those factors
          that can be generalized for all sites as being coastal-related to those factors
          twhich may, on a site-specific case-by-case basis, involve important coastal versus

          inland site trade-offs.

                  The most obvious factor tying major energy facilities,  especially
          electrical generating facilities, to the coast is the need.for  large volumes of
          water to dissipate the great amounts of waste heat. in the past when once-through
          cooling was used almost exclusively, a coastal location could  result in tremendous
          cost savings: figures developed for this report indicate that  the capital cost
          alone for a' once-through cooling system could be up to $10 million per mile to
          move water to an inland site for a 1000 MWe plant. In addition, the operating
          and maintenance cost would be enormous. One,estimate of this is 0.307 mills/kWh/
          mi (assuming a difference in elevation of 3 feet between water intake in the
          plant). With the increased,use of closed-cycle cooling systems, however, this
          dependency on the coast.has been lessened considerably. The capital costs for
          supplying water to a plant with.a closed-cycle system range from only $250,000 to
          $1 million per mile. Operating and maintenance cost are estimated to be
<pb n="302" />

                                                                                                              CHICAGO AND NORTHWESTERN TRANSPORTATION COMPANY

                                                                                                                                                                                         E-,@-"k DUMPER

                                                                                                                                                                   COAL STORAGE AREA
                                                                                                                                                                     UNITS I AND 2

            ASH DISPOSAL                                                                                                                                                                            Cm     In
                                                                                                                                                                      COAL PILE                      NO   a
                                                                                                                                                                YARD RECLAIM
                ARIA                                                         ON.
                                                              GAIN SURSTATI                                                                                                                                LIGMOI
                                                                                                                                                                                                          STORAGE
                                                                                                                                                                                 ASH                      TANK
                                                                                                                                                                                 HANDLING 0              fult OIL
                                                                                           0                                                                                     AREA-,-Q                 PUMP
                                                                                                                                                                                                          HOUSE
                                                                                                                                         SETTLING BKSIHS                                     O-CHI ANCT

                                                                                                                                                                                                            REA
                                                                                                                                                                                         2       11                1
                                                                                                                              C
                                                                                                                                 CLING TOWERS                  CON     UCTI                                              Cl
                                                                                                                               0                                     "@G.T
                                                                                                                                                                     IS @,
                                                                                                                                                                                                                                   0
                                                                                                                                                                                                                                   .4                     00
                                                                                                                                                                                                                                   0
                                                                                                                                                                                                              HOUSE
                                                                                                                                                                                     SW:TCMVAItD
                                                                                                                                    *4u""
                                                                                                                                                                                     UN TS IAND2
                                                                                                                                              st                                                                                   0
                                                                                                                                                 040,   ",v
                                                               0                                                                                              0,4c",c

                                                                                                 Cou"lly CIPA.
                                                                                                                              CQUMTT     ROAD

                                                                                                                        FIGURE        30

          SCALE: 400              0        400       Boo       1200                                             PLEASANT PRAIR IE POWER PLANT                                                                          LIEGEND

          SOURCE:                                                                                                                                                                                                  SITE BOUNDARY
                                                                                                                                                                              'A   AGER
                                                                                                                                                                              L@@
                                                                                                                                                                                 A-_ 2

                           SARGENT AND tUNDY                                        Msconsin            PRELIMINARY PL ANT LAYOUT
                                                                                    Elec&amp;yc                                                         [SOURCE 552]
<pb n="303" />

                                                                                                                                                  @
                                                                                                                                                        P CO.
                                                                                                                                                    l Wilt Y 11  E

                                                                                                                                                      PUM
                                                                                                                                                     HOUSE       1800,
                                                        NTZ                          a TH                                                            3TH St
                                                                                            T                   PERSIONG                                        - -      MINTAKE
                                    d
                                    ,u                                                                                                                          DISCHARGE

                                       ROM

                                                                                                                                            Q
                                                                                                                  P         &gt;               at
                                                                                                                            it
                                    .0                                                                            ST.
                                                                      89  5
                                    ..z                                                                                                                           LAKE MICHIGAN'

                                                                                                                            C4              4n
                                                                                                          a                     CTH.   T
                                                                                                z
                                    z
                                                                                                .01
                    PLANT SITE      %;                                                                                                                                                  00
                                                                                                                                                                                        U.)

                                          4A
             '/COUNTY -TRUNK Hl(;HrAY    T                                                                   4 T
                                                                                                            v-

                                                                                            FIGURE 31
                                                            PRCPOSED INTAKF/ DISCHARGE CORRIDOR
                                                                                                             [SOURCE - 552]
           SCALE:     0     V4      1/1          1 MILI                              PLEASANT PRAIRIE POWER PLANT                                              LEGEND
           SOURCEV                                                                                                                                    PIPE LINE CORRIDOR
                       SAM.R.P.C.0 CITY OF    KENOSHA           Hlisconsin                                                                            SITE BOUNDRY LINE
                                                                Elech7c                                                                               PROPERTY NOT OWNED BY WE.P. CO.
                                                                                                                T jP--"-;
<pb n="304" />

                                                                   284

                                                          APPLETON

                                                                              0
                                                                   CALUMET    .0         MANITOWOC
                                                                     CO.      t:O
                                                  OSHKOSH                     Zu

                                                      NE
                                                       BAGO 0.

                                                                                          HAVEN 5171
                                                FOND DU LA                    HAVEN
                                                                         SHEBOYGAN
                                                  FOND DU    LAC CO.     SHEBOYGA
                                                                              CO.

                                                                   z
                                                                   0
                                                                                     RT WASHINGTON
                                                                   0          wx--
                                                                   z                   @PORT WASHINGTON SITE
                                                                    0
                                                                    w

                                                                              0

                                                                                                                       z

                             MADISON                         WAUKESHA
                                                                 CO;               ILWAUKEE
                                                                              mu          MILWAUKEE HARBOR SITE
                            DANE CO.                                                   LAKESIDE SITE

                                                                                           OAK CREEK SITE               Lu
                                          GENERAL LILLIAM                                                               m
                                          MITCHELL 'FIELD             RACINE  CO.     RAC INE
                                 ROCK   CO.           ALWORTH Co. @TURTEVANT
                                 ICHICAGO, MIWAUKk'                                  ENOSHA
                                                       ST, PAUL AND L-f
                                 'PACIFIC RR. COMPAINY                                   KENOSHA SITE
                                         BELOIT                    :tYTEt@@O-SIHACO.          PLEASANT PRAIRIE S  .IIE
                                                     WISCONSIN
                                                      ILLINOIS

                                                                           RN
                                            CHICAGO AND NORTH WESTE
                                             TRANSPORTATION COMPANY                   AUKEGAN

                                        ALTERNATOVIE                  SOTE       LOCATIONS

                                                                   FIGURE 32

                                                    PLEASANT PRAIRIE POWER PLANY

                            WisconsIn                                                              [SOURCE - 5521
                                                           DA @C

                            Electric
<pb n="305" />

                                                285

          0.0153 mills/kWh/mi. This.reduction in cooling water supply costs for inland
          sites allows the utilities and companies much more freedom in their site selection
          procedure. This is not to say, of course, that an inland site witha closed-cycle

          system will maintain its water supply more economically than a coastal site with
          once-through cooling;.in most cases the latter would be much less expensive in
          the long run. What  it.does mean, however, is that the companies will be able to
          take advantage of other possible benefits of inland locations.
                  In the Pleasant Prairie example the following site alternative combina-

          tions were considered:

                  &amp; Both once-7through afid'mechanical draft cooling towers were considered

          for the Kenosha, Oak Creek, and Haven sites,

                     Once-through cooling exclusively was considered for the Port Washington,
          Lakeside, and Milwaukee Harbor sites.
                  e Mechanical draft cooling exclusively was considered for   the Pleasant

          Prairie site.

          While an acceptable arrangement could be developed for each of the sites using
          the systems mentioned above, there were substantial construction and operating
          cost differences between the systems and among the sites. For example, minimum
          construction cost would be incurred at the Haven, Oak Creek and Kenosha sites,
          utilizing mechanical draft cooling towers. All.schemes utilizing a once-through
          system would be considerably more expensive ($2.5 to $7.8 million, depending
          .primarily on the length of the cooling water intake and blo,wdown discharge lines
          required). The Pleasant Prairie site would incur additional construction costs
          of $5.5 million for the five-mile cooling water makeup pipeline from Lake Michigan

          to the site. jWhile construction costs for the mechanicaldraft towers are
          significantly lower than for the once-through cooling Arrangements the annual
          operating costs of approximately $850,000 per year would be'considerably higher.
                  Although long run costs for cooling water supply to-the Pleasant Prairie
          site would be higher than for the other locations, use of a closed-cycle system
          allowed the Wisconsin Electric Power Company to take advantage of other signifi-
          cant Pleasant Prairie site benefits. Specificallyj the Pleasant Prairie.site
          would incur minimum costs in tying into the existing transmission Isystem, for

          which the other sites would incur considerable costs. In addition, Pleasant
          Prairie was the only site at which adequate rail transportation access was

          already available. The Pleasant Prairie site had additional benefits not found
          at the other locations,(some of these.are discussed below).
<pb n="306" />

                                                      286

                       Another facto.r important in many'. if not all, facility location decisions
               is the location of properties owned in part or wholly by-the companies. For
               example, in most environmental reports regarding proposed facilities reviewed
               during the course of this study, it was found that.alternative sites were
               generally owned by the utilities.   In similar' fashion, fuel transshipment
               facilities and refinery expansions  are generally constructed adjacent to existing
               facilities. This is primarily a reflection of the long range.planning engaged in
               ,by the major energy suppliers. However, it can result in a definite bias toward
               coastal locations purchased by the companies in the past when once-through
               cooling was used almost without exception. This observation is borne out by the
               following citation from the Pleasant Prairie Environmental Report:
                       With the exception of Pleasant Prairie, all of the candidate sites
                       were located on Lake Michigan ... All sites are owned by the
                       Applicant with the exception of the Milwaukee Harbor site and
                       small parcels at some of the other sites [552; p.6.3-1).
                       A factor of considerable importance, especially in the siting of fossil-
               fuel power plants, is the location of fuel delivery-routes and transshipment
               point@. As was indicated in-the discussion of transportation access in the
               fossil-fuel facility description [Section IV.A..5.b.(l)], it is desirable to have
               a location offering fuel delivery options; a coastal site served by both lake
               carrier and railroads would meet that requirement. There are many locations in
               the Great Lakes Region where delivery by lake vessel or barge is far more
               economical than by unit train.   For a 1000 MWe coai-fired plant using 2.8 million
               tons of coal per year it would cost approximately $150,000 per mile per year to
               transport coal inland, in addition to the handling and land costs for port and
               terminal storage. Cost savings for fuel supply (in addition to water supply) in

               such a case would tend to favor a coastal location.

                       While fuel delivery via lake carrier or barge may not be an important
               consideration in the case of nuclear facilities, delivery of major facility
               components might very well be. As was discussed in the transportation access
               section in the nuclear plant description [Section IV.A.c.(I)], ease in delivery
               of large reactor and turbine components may favor locations with water access.
                       In the Pleasant Prairie example, the o               1
                                                              pposite situation was.found. Coal
               receipt was to be exclusively by unit train from the western 'United States, and
               the Pleasant Prairie location offered the least expensive alternative with respect
               to fuel supply. This cost savings was able to partially offset the increased
               .cost of cooling water supply, illustrating the advantages of coastal nondep&amp;ndency.
<pb n="307" />

                                                   287

                  Two  important factors  were identified in thediscussion     of the hydro-
          logical and  meteorological site requirements for nuclear plants     related to
          shoreline sites: (1) the change in atmospheric stability that occurs at the land-
          air interface,  and (2) the change in wind trajectory experienced when air moves
          from the smooth surface of'the water to the irregular land surface.        These
          concerns highlight the   fact that local coastal meteorology may be an     important
          factor in determining whether or not a facility should be      located on  or near the
          lakeshore. This consideration was further addressed with       respect to  coastal
          meteorology as it affects the dispersion of emissions from fossil fuel plants.
                  The influence of the lakes onmeteorological patterns plays        an
                  important role in deternAning nitrogen oxide and hydrocarbon
                  impacts on the air quality onshore. For example, Milwaukee has
                  experienced high oxidant air pollution reading at times when
                  emission activity was low. One theory is that the daytime
                  nitrogen oxide and hydrocarbon emissions are blown out.over.
                  Lake Michigan by a land breeze, photochemically reacted to form
                  oxidants, and blown back to the shore with     the evening lake
                  breeze. There are only sketchy experimental data to verify
                  this hypothesis. Nevertheless', the lakes do play a significant
                  role in determining the transport of pollutants [546; p.80].
                  The Pleasant Prairiereport*provides'a perfect example of these types of
          concerns. With respect to air quality, the Haven site was the most desirable,
          being located in an area which had no othermajor sources of pollution. In this
          regard, the Pleasant Prairie site ranked second and was.located further away from
          local and.metropolitan emissions than the other sites available. Concerning
          meteorology and@climatology, all the sites are located in a region characterized
          by favorable large scale dispersion patterns. The Pleasant Prairie site,        however,
          appeared to be the most acceptable in this respect because it was further       inland,
          with frequency and intensity of lake effects being less than at the       other sites.
          Therefore, "the potential for fumigation of stack     emiss ion and for ground  level
          fogging and icing due to the cooling tower emissions during onshore winds       will be
          less than for the lake shore sites" [552; p.6.3-6].

                  A second concern related to local shoreline     meteorology is-the potential
          effect of the facility on the local.'climate'. For example, in some areas (e'.g.,
          Erie County, Pennsylvania,and southwestern Michigan) the presence of the lakes
          creates a climate uniquely suited to specialized agricultural crops, such,as
          fruits, by extending and stabilizing local growing'seasons. The presence of a
          major energy facility, especia  .lly'one fitted with a closed-cycle cooling system,
          @could possibly change these conditions. The potential for such changes would

          have. to be evaluated.
<pb n="308" />

                                                        288

                         The.aesthetic impact of a coastally located energy facility can be great.
                While this may not be true for all locations (e.g., highly industrialized areas
                such as Gary, Indiana, and Lackawana, New York) there most certainly are many
                areas along the Great Lakes shoreline which would be severely disruptedby the
                presence of such a facility. While there may also be aesthetically unique areas

                inland from the coast, it is more likely that such areas would be of limited
                extent along the coast. This would indicate a desirability to locate facilities
                away from these unique shoreline areas when possible.
                         There are a series of coastal-related factors   that may tend to favor
                inland locations to allow savings in construction costs. Examples of these are
                areas subject to flooding during periods of high lake levels, coastal reaches
                subject to high rates of erosion requiring expensive (and sometimes ineffective)
                erosion control structures, areas requiring significant bluff restructuring,
                sites requiring significant fill, and sites requiring special foundations. As
                the.shoreline segment maps in Figure 33 indicate, the Great Lakes coast is highly
                variable and these factors must be evaluated on a site-by-site basis. It is
                sufficient to say, however, that there are many areas in the Great Lakes Basin
                where inland locations may be preferable to near-shore locations to avoid such
                problems.
                         Several'of these considerations were brought out in the'selection of the
                Pleasant Prairie site. The comparisons of site preparation costs included:
                special structures required, earth work, demolition, and associated costs. The
                only major difference among the sites was in the amount of earth work required.
                The, Haven, Milwaukee Harbor, and Pleasant Prairie sites required a minimum

                amount.of earth work and thus showed the minimum cost. Two Oak Creek alterna-

                      and the Kenosha site would have required major grading and use of borrow
                material with associated costs of approximately $400,000. The Port Washington,
                Lakeside, and a third Oak Creek alternative required landfill and extensive
                restructuring of bluffs. Costs associated with these activities were estimated
                at approximately $5 to $6 million above the minimum site preparation costs. In
                addition, the Haven, Oak Creek, Kenosha, and Pleasant Prairie sites could utilize
                mat foundations. The Port Washington, Milwaukee Harbor, Lakeside, and a variation
                of the.Oak-Creek site would use landfill and,thus would require pile foundations
                at an additional cost of approximately $4.4 million. Thus, the lower construc-

                tion costs associated with the inland site tended to favor    the selection of

                Pleasant Prairie.
<pb n="309" />

                                                                                                                                                        289

                                                                                                                                              FIGURE 33

                                                                                                                           EXAMPLES OF GREAT LAKES

                                                                                                                                      SHORELINE TYPES

                                      L-3@

                                                                                                         LAKE SUPERIOR

                                                                   Z:
                                                                                   .4e

                                                                   MARQUETTE

                                                                                                                                                                                  0
                                                                                                                                                                          ALG      c-L
                                                                                                                                                                                         1""' S"i-

                                                                                                                    LAKE ERIE                                                                         Shore type
                                                                                              ,IV                                         to
                                                                                                                                                                                                                      Artificial Fill Area                                     A
                                                                                                                                                       W
                                                                                                                                                                                                                                    High Bluff.
                                                            7                                                                                    LS-                                                                  Erodible
                                                                                                                                                                                                                                    30 ft. or higher _H8,.
                                                                                                            LA
                                        LUpks                                                                                                        r-L0,1W                                                          Nom-Erodible High Bluff.
                                                                           __w                                                                                                                                                      30 ft. or higher _Hll@
                                                                                      OTTAW
                                                                                                                                                   R -,        L8.
                                                                 Woo.         I                                                                            .
                                                                                                                                                                                                                      Erodible Low Blut , less
                                                                                                                                                                                                                                    than 30fft. high -1.8,
                                                                                                                           7
                                                                                                                                 .. I
                                                                                              9,,@q                              rt Clih- w-                    1.01W                                                 Non-Eradib
                                                                                                                                                                                                                                    le Low   Bluff, less
                                                                                                                                                                                                                                    han 30 ft. high _L8.
                                                                                                 SANDU     KY                             w       Q. /I,                                                              High Sand Dune, 30 ft.
                                                                                                                                        S-d-i v
                                                                                                                                 LB,                                                                                                or higher                                  HD
                                                                                                                                                  &amp;RIE                                                                Low Sand Dure, less than
                                                                                                                                                                                                                                    30 ft. h,gh                                LD

                                                                                                                                      L_                                                                              Erodible Low Plain                                       P,

                                                                                                                                                                                                                      Non-Erodible Low Plain                                   P@

                                                                                                                                                                                                                      Wetlands

                                                                                                                                                                                                                      Combinations Shown As:                          E.arnole

                                                                                                                                                                                                                                    Lakeward/ Landward                         'NIP,

                                                                                                                                                                                                                                    Loper 111,11                               KLE
                                                                                                                                                                                                                                    Lower gu',           r::                   He'.
                                                                                                                                                                                                       Beach Material
                                                                                                                           J                                                                                                                                            -,77=
                                                                                                                                                                                                                      Sand and gra@el

                                                                                                                                                                                                                      Ledge rock
                                                                                                         L&amp; 'r,
                                                                                                                                                                                                                      No Beach
                                                                                                           P,
                                                                                   H
                                                                                   HB,                                                                                                                 Problem Identification
                                                                                   B,
                                                                                                                                 '60                                                                                  Areas"subject to erosion
                                                                                                                                                                                                                                    generally Protected -aaaaaa
                                                                                                                           41LP@
                                                                                                                                                                                                                      Critical erosion areas not
                                                                                                                                 L
                                                                                                                                                                                                                                    Protected
                                                                                Gf- l                                            -P,                                                                                  Non-critical erosion areas
                                                                                                      LO
                                                        10,                                                                                                                                                                         not protected _aiaiiaia
                                                        27-
                                                       Hlk_@!                                                              P,                                                                                         Shoreline subject to lake
                                                                                                               TI.,        C                                                                                                        tloodimg@
                                                                                                         GRAND TRAVERSE                                                                                               Shoreline not subject to
                                                                                                                                                                                                                                    erosion or flooding
                                                                                                                                                                                                                      Bluff seepage problems                                   ZL

                                                                                                                                                                                                                                     [SOURCE                         6071
<pb n="310" />

                                                      290

                      Just as there'are-a wide variety of shoreline characteristics.that
              influence construction costs, there are also many landforms and habitats which
              make portions of the coast unique. Examples include the rocky cliffs along
              portions of the Lake Superior shoreline, the sand*dunes along eastern Lake
              Michigan, and. the areas of coastal wetlands. In many cases these features may      be
              quit e rare and limited in their extent. For example, there are only 57 miles of
              coastal wetlands in the entire Great Lakes Region, amounting to only 1.5 percent
              of the total shoreline mileage [436). In some cases the protection of these rare
              and unique landforms and habitats may require the inland siting of energy
              facilities. This may become especially true when the state coastal zone manage-
              ment programs begin to designate areas of particular concern.
                      Not only should potential conflicts with the land in its natural state be
              avoided, but also conflicts with.various land uses. The Great Lakes shoreline is
              and will continue to be put to many uses by people from both within and outside
              of the region. Some of these uses, such as lake fishing, swimming, and boating,
              re.quire the use of the lake. Others, while not absolutely requiring a lakeshore
              location can be greatly enhanced by one, such as second home development,
              picnicking, hiking, nature study, etc. Displacement of these uses by committing
              large tracts of land to energy facilities for long periods of time can result in
              long-term social costs and lost resources. The need to look at these alternative
              land use conflicts has been alluded to at several points in the discussion of
              energy facility impacts. The desirability of avoiding such conflicts      may indicate
              a preference for inland locations for large energy facilities. Because the amount
              of shoreline is immutably fixed, it is important that uses of it should be
              assigned priorities, with those not requiring a coastal location sited inland when
              possible.

                      C. Summaly
                      This discussion of the coastal dependence or nondependence of energy
              facilities in the Great Lakes Region has necessarily been conducted at a very
              general level. Because of this it has identified only one generally applicable
              example of a trade-off that must be made between coastal and non-coastal loca-
              tions; the supply ofwater for the main cooling system. There are however, a
              large number of other considerations that should be evaluated on a site-by-site
              basis to determine the importance of a shoreline location for a proposed power
              plant: utility land ownership, mode of fuel delivery, local meteorology and
<pb n="311" />

                                                291

          dispersion patterns, aesthetics, potential con'struction problems, unique land-
          forms and habitats, and potential land use conflicts. The use of the.Pleasant
          Prairie example has served to illustrate that none of these factors can be
          considered in a vacuum. A similar evaluation of another plant in a different

          area of the Basin could show a strong coastal dependence. The trade-offs and
          relative economies associated with each must,be evaluated so an overall picture
          of the coastal dependency of a given facility can be developed.

              7. CONCLUSIONS AND IMPLICATIONS FOR POLICY OPTIONS

                  The preceding descriptions and discussions of energy facilities and
          their associated siting requirements and environmental and economic impacts have
          been provided to determine the degree to which these facilities are dependent on
          coastal resources, and to highlight those siting factors which appear to be most
          coastal dependent. The discussion of coastal dependence which directly precedes
          this section attempts to outline those technical considerations and environmental
          impacts which most heavily depend.on or affect coastal resources. These coastal
          dependent factors are.further clarified by relating them to a case study reporting
          the actual coastal and non-coastal factors considered in the siting of a fossil-

          fuel power plant.
                  Briefly, the following factors and considerations have been highlighted
          in the fore-going discussionas the most coastal dependent in relation to the
          siting of energy facilities in the Great Lakes Basin:
                  e The Great Lakes coastal zone provides resources and opportunities for
          many uses. Inevitably, the development of some of these uses must necessarily
          exclude or displace others.
                     Unique landforms and habitats presently exist in Great Lakes coastal

          areas.

                     Aesthetic considerations such as scenic coastal vistas are unique to

          the Great Lakes coastal zone.
                  0 Special construction constraints such as bluff reshaping and shore
          protection are associated only with the lakeshore.
                  0 Coastal meteorology and related dispersive capability are special
          siting considerations on a site-specific basis.
                  e Many utilities presently own land along the coast for future develop-
          ment of energy facilities.
<pb n="312" />

                                                       292

                       o. The Great Lakes represent a large and easily accessible.source of
              Iwater for cooling purposes.
                       o Access to waterborne transport of fuels and materials is necessarily
              related to the Great Lakes ports and terminals.
                       The following-general. conclusions can be cited with respect@to the
              coastal  dependence of power plants.:
                          Facilities using once-through cooling.must be located on or near the
              shoreline because of the substantial costs of transpo    rting cooling water inland
              via pipeline.
                          Facilities using close.d-cycle cooling are less dependent on loca:,tions
             -,.o,n or near the shoreline than are facilities using once-through,cooling, assuming
              all other factors to be approximately equal for sites being compared. Site
              conditions will determine the type of closed-cycle cooling system used. However,
              the furtherinland a facility is located, the greater are'the construction
              (capital) costs for water provision and blowdown pipelines..
                       o For power plants using closed-cycle cooling, the cost of locating on
              the shoreline versus@the cost Of locating inland are essentially trade-offs
              .among the construction and operati.on cost.s, of such necessities as transmission
              lines, water supply and cooling facilities, facilities for-delivery and handling
             ,...of fuels and other supplies,. and disposal of waste material.
                          Nuclear facilities require very large andmassive      compone-nts, which in
              most casesare delivered via water-transportation. However,        rail,or road
              corridors of,ade'quate width and load-carrying capacity can be utilized for
             ,delivery of these components. If these rail or road corridors are@ not available
             ,,to potential sites, the location of nuclear facilities may be more dependent on
              shoreline or near.-shoreline locations. However, field assembly is becoming more
            ...,@common, thus possibly negating some of this shoreline dependence. Other nuclear
              facility coastal dependence considerations are the same as in the preceding item.
                       The coastal.dependence of fuel transshipment and storage facilities.and

              refineries can be summarized as follows:
                       e Fuel.(coal and oil) transshipment and storage facilities that receive
              or ship  their commodities by water must locate near the shoreline, although
              storage  areas do not have to be located on the shoreline. Storage area. location
              is highly,dependent on industrial needs, future transportation requirements, and

              onsite and offsite use of stored fuel.
<pb n="313" />

                                                 293

                  e Refineries are not coastal dependent, but do need access to water for
          processing and cooling. Dependence on easily accessible water is decreasing due
          to increasing water recycling practices. Air cooling is also reducing refinery
          dependence on,easy water access. Refinery location decisions are increasingly
          becoming market oriented, with decisions being made on a national basis, due-to
          the existence of the national product distribution pipeline.
                  Finally, coal gasification and liquefaction facilities are not likely to
          be located in the Great Lakes Basin, with the possible exception of low-Btu gasi-
          fication facilities, which can be located at or near the site of use. Large
          coal gasification and liquefaction facilities will be located near mine mouth
          locations due to the high cost of transporting coal compared to substitute natural

          gas.
                  The implications of this report on technical considerations for the
          development of policy options relating to energy facility siting in the coastal
          zone are many-and varied. In a general sense,,however, it is possible to say
          that no one factor absolutely ties a given energy facility to a coastal site.
          Furthermore,'it is evident from the discussion of-technical considerations and
          the case study that there are-a number of technical options which maybe generated
          for future siting considerations. These options are predicated on the conclusion
          that energy facilities are not coastal dependen t@per se,-and that it is possible
          that they be sited inland fromIthe coast while.,maintaining certain degrees of
          access to coastal resources. The technical policy options and implications
          developed in Section VI.C are based on this tenet of nondependency.
                  At this point, a concluding statement. on facility siting should be made.
          The entire preceding section dealt with technical considerations affecting siting
          of energy facilities. It shou  ld be noted that there are other possible (or even
         ,probable) considerations of a nontechnical nature which may affect the final site
          selection.process. More specifically, these considerations relate to politico-
          economic decisions ba sed on expediency and profit motivation. To ignore the
          existence of these nontechnical considerations in the site selection process
          would be naive; to assess their magnitude in relation to coastal siting would be
          impossible.
<pb n="314" />

                                                     294

             B. ENERGY CONSUMPTION AND MOVEMENT IN THE GREAT LAKES REGION

                 1. INTRODUCTION

                      Rational planning for the future necessitates a sound knowledge of the
             present    The following information was collected for the purpose of providing
             that knowledge. -This section-presents collected data on the present energy
             situation.pertinent to the Great Lakes coastal zone.

                      An attempt was made to concentrate on those aspects of supply, transpor-
             tation and utilization of energy that relate to electric power generation and the
             coastal zone. Electric generating facilities and fuel transshipment points are
             discussed both in the context of present capacities and locations and of planned

             and scheduled facilities.

                      A major portion of this section attempts to address the question of the
             future relationship between energy facilities and the coastal zone.     This
             discussion focuses on the relationship between electric generating facilities
             and potential fuel mi@:cs. Further, the pro  blems associated with determining,
             -future demand levels for electric energy are discussed in the context of how
             .various demand growth rates may affect siting of electric generating facilities.
             'Finally, a number of potential fuel mixes and growth rates were postulated in the
             attempt to determine possible future resource requirements and pressures on the

             coastal  zone.

                 2.   ENERGY DEMAND

                      a. Fuels for  Power Production

                      The Great Lakes Region is one of the most highly industrialized and
             energy consumptive regions in.the w orld. Its development is in large measure
             --facilitated by the ease of commodity transportation on the lakes and the wealth
             of fuel resources within the eight states bordering the Great Lakes. Energy
             production in the Great Lakes states reflects the unique resource capabilities

             of the region.
                      An average of over ninety percent of the fossil-fuel electrical generating
             lacilities are coal fired in seven of the eight Great Lakes states. This section
             will therefore focus on the origin,   transporltation and end use of coal, although
             other fuels will be discussed also.    The discussion will assume a regional and
             state perspective with special emphasis.on activity in the coastal zone.
<pb n="315" />

                                                         295

                          (1)   Origin of Fuels
                     The  Great Lakes Basin states are     net importers of energy. Each state
            consumes more energy from coal, oil and        natural gas than it can produce-. Even
            the majorcoal- and oil-producing states of Pennsylvania and Illinois consume
            over twice as much fuel as they produce        [618]. Thus, the Great Lakes Region must
            depend heavily on fuels-from.elsewhere.

                                (a) Coal

                     The United States has an abundant      supply of coal. The estimated reserve
            base for the country is 434 billion'short        tons. This is an estimate of the
            identified resources deemed suitable for mining by 1974 methods [191. -At the
            present consumption rate of approximately       600 million tons per year this resource

            could last.six or seven centuries.
                     There are three primary coal supply-regions: the Appalachian, Illinois

            and Western basins.

                     The preponderance of coal'consumed in the Great Lakes states is produced
            in the  Appalachian and Illinois coal fields. These two major fields supply most
            of the  region's needs for coal,for power production. Pennsylvania and Ohio supply
            ilmost  40% of the coal used by electric utilities in the         Great.Lakes states.
            Illinois, Kentucky and Indiana follow,,in order behind these states. Combined,
            the five states provided 76% of the total coal supplied to the Great Lakes
            utilities in 1975 [5471.

                                     FIVE LARGEST COAL PRODUCING STATES

                                           FOR ELECTRIC UTILITY USE

                                         INTHE GREAT LAKES STATES

                                                           1975               1975 Percent of
                      State'                            (1000 Tons)      Great Lakes States Total

                      Pennsylvania                         38,093                 19.5

                      Ohio                                 37,533                 1.9.2

                      Illinois                             31,201                 16.0

                      Kentucky                             22,933                 11.8

                      Indiana                            _2010172                 10.3

                                    TOTAL                149,932                  76.8

                 SOURCE [5471
<pb n="316" />

                                                                                                                                         296

                                                         Recently, air quality standards have forced utilities to purchase a lower
                                      sulfur coal than commonly found i; the eastern fields. The purchase of a
                                      considerably lower sulfur coal from the Western basin, primarily Montana and
                                      Wyoming, has increased considerably in the region. Between 1974 and 1975 there

                                      was a 58.3% increase in western coal destined for states in the East Northcentral

                                      Region (Wisconsin, Illinois,*Indiana, Ohio and Michigan). Ninety-five percent of
                                      the western coal shipped to the Great Lakes states was produced in Montana or
                                      Wyoming. Most of this fuel was surface mined and of sub-bituminous grade [547].
                                      Table 51 presents the major state sources of coal to electric utilities in the

                                      Great Lakes states.

                                                                                                                               TABLE 51

                                                                                         ORIG1N AND DEs,rINATION OF COAL DELIVERIES

                                                                                                      TO ELECTRIC UTILITIES IN 1975
                                                                                                               (Deliveries in 1000 Lons)

                                                                                                                                          0 R I G I N

                                                                                                I A S T 9 R N                                     H I D W 9 S T                               W 9 S T 9 9 N

                                                                                                                                                                                                                                        Percent Total
                                                                                                                                                                                                                                        -C-1 Fr-
                                                       DESTINATION           KENTUCKY          01110           W. VA.           'PA.            ILL.             IND.           MONT.             WYO.        @OLO        UTAH          AlI   States
                                                       1111noia              1.182.1               9.1              0.3                       21,218.1             379.3        9,310.5         1,866.3          10.3       20.0        33,99@,O     99,
                                                                                                                                                                                                                                        33,999.3
                                                                             5,045.5               0.9             75.0                        3,134.6         18,896.4             819.0       2,841.4              1.6  130.3         30 944 1
                                                       India                                                                                                                                                                            30:968:1     992
                                                       HIchigan              5.778.7          8,362.3          5,116.6            691.0          274.5              82.2        1,056.0             -                -          -       21,361.3     991
                                                                                                                                                                                                                                        21,361.8
                                                       Minnesota                  98.3             0.4              3.0              -         1,717.3                -         6,205.1              2.2             3.0    60.9        8190.2       921
                                                       N- York                  524.0              -             839.7         4.591.6           -                  -               -              -             5.0            -       5,960.3      99   2
                                                                                                                                                                                                                                        5,970.8

                                                       01.1.                 7,151.9         29,113.6          6,540.6         2,168.2                              29.6                          931.7              1.9  362.4         4_6 105-9    9,2
                                                                                                                                                                                                                                        46,860.1

                                                       P.-YI-ni.             1,080.4               20.3        4.216.2        30,070.3               -                -                               -              -          -       35.3a7.2     99   X
                                                                                                                                                                                                                                        35,448.9
                                                       Wisconsin             2,072.6               26.6             4.6           572.4        4,856.9             704.6        2,161.2         1,052.8          20.2           -       11,551.9     9,2
                                                                                                                                                                                                                                        11,55Z.5

                                                           TOTAL             22.933.5        37,533.2         16,796.0        38,093.5        31,201.4         20,172.1         19.551.8        6,700.4         316.5     573.6         194,659.1    99Z
                                                                                                                                                                                                                                        194,959.1

                                                       SOURCE:               [547]
                                                       NOTE: Does not include anthracite and imported coal.

                                      The coal resources in                                    this country have been extensively surveyed. The magnitude
                                      of remaining deposits                                    provides a stable base for fossil fuel-fired electricity
                                      generation. The quantity of this fuel is not at issue. Concern centers rather

                                      on environmental and health risks involved in coal utilization. These factors

                                      will to a large extent determine the coal type recovered for future use.
<pb n="317" />

                                                                                                             297

                                                              (b) Oil and natural gas
                                         Ali. the Great Lakes states except                                         New York have a fossil-fuel mix
                        percentage for electrical generation lower in oil and.natural gas than the rest
                        of the country. These seven states used about 5% oil and 3,% gas for power. The
                        national figures in 1975.were 18                                       .9% oil and 19.8% gas for the generation of,
                        electricity [547]. Further analysi                                           s of these statistics,is contained in the

                        discussion of fuel mixes.

                                         Most of the sources for oll and natural gas are distant from the Great
                        Lakes Region. A network of pipellnes carries oil and gas into.the region from the
                        south, central, and Gulf states' Canada also supplies oil to the region from

                        fields in Alberta. With Canadian demand increasing, this source will soon be
                        terminated to the Great Lakes.states. The Great Lakes states are relatively
                        mi. nor producers of oil and natural gas, contributing about 3% of the U.S. oil
                        production and 2% of the national gas production [24]. The region must therefore
                        import substantial quantities of oil and gas. An examination of production and
                        consumption figures in the eight states for oil and natural gas reveals that the
                        states supply about 4% of their annual consumption [6181. Figures 34 and 35
                        show the major sources of natural gas and oil for the Great Lakes Basin states.

                                                                                                    FIGURE 34

                                             SOURCES OF NATURAL GAS SUPPLY TO                                         THE GREAT LAKES BASIN STATES

                                                    GLGT - GREAT LAKES TRANSMISSION CO.                      PEPL -  PANHANDLE EASTERN PIPELINE CO.
                                                    MVPL -  MICHIGAN WISCONSIN PIPELINE CO.                  TET -   TEXAS EASTERN TRANSMISSION CO.
                                                    NGPL -  NATURAL GAS PIPELINE CO. OF AMERICA              TGPL  _ TENNESSEE GAS PIPELINE CO.
                                                    NNG -   NORTHERN NATURAL GAS CO,
<pb n="318" />

                                                                                                                    298

                                                                                                           FIGURE 35__@

                                                      SOURCES OF CRUDE OIL SUPPLYTO THE                                             GREAT LAKES BASIN

                                                      40C    AMOCO OIL CO.                                   NVPC -   MID-VALLEY  PIPELINE CO.
                                                      APLC   ARCO PIPELINE CO.                               NTC    - NATIONAL TRANSIT CO.                    (Source 618]
                                                      FLC    LAKEHEAD PIPELINE CO., INC.                     SPLC   - SHELL PIPELINE CO.
                                                      VAR    MARATHON PIPELINE CO.                           TCSP   -; TEXACIO-CITIES SERVICE PIPELINE CO.
                                                      VPLC   MOBIL PIPELINE CO.                              TPLC   - TECUMSEH PIPELINE CO.

                                                                                                                       LPLC

                                                                                                                                 TPL

                                                 Future.long-term supplies of Alaskan oil to the Great Lakes' region                                                                                  I are
                                pr-sently under consideration. Three major long-term options have                                                                                   emerged for
                                transport of the oil.
                                                 e Trans-Provincial Pipeline--Alaskan crude transported                                                                      by     tanker from
                                Valdez, Alaska, would be delivered to a new deepwater port at Kitimat, British
                                Columbia., The oil then would be transferred to a 30-inch pipeline and would
                                move 830 miles to Edmonton, Alberta. In Edmonton the oil would move into
                                existing pipelines. The Trans-Provincial Pipeline would utilize the Interpro-
                            ,.vincial/Lakehead Pipeline system presently serving the Great Lakes Region. The
                                proposal           is projected for an initial total capacity of 300,000 barrels per day
                                with an eventual capacity of 650,000 barrels per day [490].
                                                        Northern Tier Pipeline--This proposed line would                                                             cross the northern
                                tier of states from a deepwater facility in Port Angeles, Washington, to Clear-
                                brook, Minnesota. This 40- to 42-inch line would stretch 1500 miles and                                                                                           con4@ct
                                with Minnesota and Lakehead pipelines in-Clearbrook, Minnesota. Initial                                                                                           opera-
                                tional capacity is projected as 600,000 barrels                                                           per day with an eventual                                capacity
                                of 800,000 to 1,200,000 barrels per day [490].
<pb n="319" />

                                                     299

                     9 Williams Pipeline Company--This    expansion involves construction of a
            500-mile  pipeline from Oklahoma to Iowa.    The proposed 24-inch line would receive
            oil from  existing pipelines connected to   a new deepwater facility in Texas. The
            Williams  line could also connect to a proposed pipeline from Long    Beach, Cali-
            fornia.   The new system could provide an additional 350,000 barrels per day of
            crude oil from Oklahoma to Minneapolis, Minnesota [490].
                     The availability of oil  in the future relies on the   rate of new discover-
            ies and the economic incentives   arranged to promote further   exploration.
            Development of coal liquefaction technologies may also affect the supply of liquid

            fossil.fuels.

                     Additional sources of natural gas to the Great Lakes states may also
            arrive fromAlaska. Proven natural gas reserves in the North Slope are estimated
            at 22.5 trillion cubic feet. The proposed Artic Gas system would transport gas
            through 5,551 miles of buried pipeline overland from northern Alaska through

            northern and western Canada to three ultimate destinations within the 48

            contiguous United States. One of these destinations would be Delmont, Pennsylvania,
            where an estimated 1.5 billion cfd could be delivered.

                     The other major alternative, the El Paso Alaska system, would move gas.
            south from the Prudhoe Bay area by pipeline to a port on the southern Alaskan
            coast. There the gas would be converted to liquified natural gas (LNG) and
            shipped via cr Iyogenic tanker along the northern Pacific coast to a delivery point
            on the California coast. The LNG would then be regasified and would be distributed
            @hrough the gas pipeline network. The El Paso Alaska system would      provide gas to
            the,Great Lakes Region by rerouting northward the,gas previously required on the
            west coast [2571.

                          (2  Great Lakes  States Production  and Reserves
                     Oil, natural gas and  coal are produced  in the states bordering the Great
            Lakes.   Peat, a potential fuel found in the Great Lakes Region,    is not presently
            used as  a fuel for power, production.. The four southernmost Great Lakes states,
            Illinois, Indiana, Ohio and Pennsylvania, yield most of the gaaand oil and
            virtually all the coal produced in the Great Lakes states. A summary of fuel
            productiph and reserve capacity by state follows.
                     9 Illinois--Illinois has a recoverable reserve     of coal greater than the
            combined reserve of the remaining seven Great Lakes states [19]. Deposits under-
            lie 65% of the state and are found in 86 of its 102 counties@[51. Illinois holds
<pb n="320" />

                                                       300

               15.1% of the country's total coal reserves, or'65 billion tons. This plentiful
               resource, which has a high heating value ranging from 10,500 to 13,000 Btu's per
               pound, accounts-for 16.6% of the,nation's potential energy reserve from coal [4].
               Illinois coal production, although on the decline, contributed 9.6% of the total U.S.
               coal production in 1974 [327]. The state mined 58,215,000 short tons that year
               compared to an average 64,197,000 tons/year between 1966 and 1970 [585]. The
               .decline in.coal production is in many  ways symptomatic of the quality of Illinois
               coal. Much of this coal has a 3 to 5% range in sulfur content, which exceeds the
               standards set by'the Environmental Protection Agency [4]. The Federal Power
               Commission in 1973 estimated that more than 85% of the coal.now being burnedby

               Illinois electric utilities would be prohibited when sulfur emission standards
               are enforced [3]. This valuable resource therefore grows increasingly impractical
               for power generation and depends on the development of efficient technology for.

               sulfur removal.
                       Illinois also has substantial reserves of oil and natural gas. ..Illinois
               oil production was 26,080,000 bbl of crude in 1975 [319], which was the highest
               for the eight Great Lakes states. The state had an estimated reserve in 1974 of
               162.3 million barrels, which among the Great Lakes states was-second only to
               Michigan [24].
                       Natural  gas production was 2,840 million cubic feet in 1973, with
               reserves in total gas of 380,525 million cubic feet [586]. Illinois is developing
               ;the use of underground caverns for.storing liqdified petroleum gases. The.
             ..Illinois Great Lakes Basin counties of Will and Dupage presently store 46,000 bbl
               of LP gas and 250,000 bb! of propane and butane [3].
                       Peat, which is not sold as a fuel for power production, is the only fuel
               mined in the coastal zone [317].
                       9 Indiana--The mineral industry survey for Indiana in 1975 reports that

                       Mineral fuels accounted for about 58% of the estimated value of
                       Indiana's mineral produc.tion in 1975, 15% higher than in 1974.
                       Coal, which alone accounted for nearly half of the total value of
                       all mineral output, increased an estimated 5% in quantity and 19%
                       in value. Output of both petroleum and-na-tural gas declined sharply
                       in 1.975; continuing a downward trend which has occurred annually
                       since 1 65 [3201.

                       In 1975, Indiana produced 24.8   million  short tons of bituminous and
               lignite coal [3201. The   state ha.d,-.a demonstrated coal reserve in 1974 of 10.6
               billion tons. Sixty'@-four percent  of this .reserve has a sulfur content greater
               than three percent, which  makes.it environmentally unfavorable. No coal      is mined

               in the-Indiana coastal counties.,
<pb n="321" />

                                                   301

                   Crude petroleum production in Indiana in 1975 was 4.6 mill.ion-barrels, a
           decrease of 287,000.bbl from 1974 production (4031. Reserves of Ind     iana crude
           oil were 29.6 million barrels in 1974 [24]. A small amount of the oil produced
           in 1974 came from the coastal county of LaPorte, which produced 3,389 barrels
           [321].
                   Production of natural gas.in -Indiana has declined also.     Production fell
           from 176 million cubic feet in 1974 to 126 mmcf in'1975 [320].      Though reserves
           of natural gas are estimated at.5,308 mmcf, 50% of this reserve     is.in nonproducing
           reservoirs-[24].
                   0 Michigan -Michigan produced no coal'in 1974 [327]. Coal'@ftelds-are'
           found beneath 20% of the state, but the resource,is thinly distributed, yielding
           an identified coal reserve base of only 119 million tons [19].
                   Michigan's petroleum production in 1975 increased 6.3 million barrel's
           from the previous year, yielding.a total of 24,413,000 bbl [319]. Petroleum*was
           produced in the coastal counties of Allegan,-Antrim, Arenac@, Bay, Grand Traverse,
         .Huron, Macomb, Mason, Monroe, Muskegon   ,' Oceana, Ottawa, Presque Isle, St.'Clair,
           Tuscola,'VanBuren, and Wayne. These counties produced 1,757,000 barrels in 1975,
           which accounted for about 14% of the total state@petroleum production [317].
           Michigan's oil reserve of 164.1 million barrels is the largest of the eight Great

           Lakes states.

                   Natural gas production in Michigan in 1975 was 102 billion cubic feet
           which was an increase of 32 billion.cubic feet over 1974 [75]. Natural gas wa's
           produced in*th4E@ coastal counties of Allegan, Grand Traverse,@ Macomb, Ottawa,-and
           St. Clair (also natural gas liquids) in 1972 [319].' Michigan exceeded the
           remaining Great Lakes states in production and reserves of natural gas in 1974.
           Total reserves were estimated at 1,041 billion cubic feet [24].
                   Michigan produced IA million'barrels of natural gas..liquids in 1973.       Of
           this total 65% was liquified petroleum (LP) gas and 35% was natural gasoline.
           Proved reserves of this resource:totaled 25 million barrels in 1973, which was an
           increase of 6 million barrels over the previous year's estimate [586,1.
                   Overall, Michigan is able to   produce approximately 10% of its needs for
           oil and gas, so must still import the majority of its energy [751.
                      Minnesota--Minnesota claims 50% of the nation's known supply of peat.
           Peat, th: only potential mineral   fuel Minnes o.-ta produces, was us.ed  pri.marily for
           potting purposes (3171.
<pb n="322" />

                                                        302

                           New-York--New York's mineral fuel production is restricted to natural
               gas and petroleum. Negligible coal resources are estimated to cover 10 square
               miles of New York's total area of 49,576 square miles [19]. In 1975 New York
               produced 890,000 barrels of crude petroleum, which was a decrease of 6,000
               barrels from 1974 [319]. The state showed crude oil reserves of 6,667 mbbl.in
               19.74 [241. Chautauqua County was the sole New York Great Lakes coastal county to
               produce oil. In 1973 this county-had 43% (41 wells) of New York's proved oil
               field wells [586].-
                        Natural gas production in New York was 4.5 million cubic    feet in 1973.
               This represented a 23% increase over production in the previous year [586]. The
               estimate of natural gas reserves in New York was 87.1 billion cubic feet. The
               coastal counties of Cayuga, Chautauqua, Erie and Monroe produced natural gas.
               Erie and Chautauqua Counties had 87% (21 wells) of New York's proved natural gas
               field wells in 1973 [586].
                        e Ohio--Ohio coal   production in 1914 was 45.4 million short   tons, which
               accounted for 7.5% of the national coal production [327]. In term's of value,
               bituminous coal is the state's principal mineral commodity, contributing $338.8
               million to the economy in 1973 [586].
                        There was a demonstrated coal reserve in Ohio of 21 billion tons [19].
               Of this reserve 60% has sulfur content greater than 3.0% [327]. Most of the
               future production of coal in Ohio will depend on recovery from underground mines.

               An estimated 80% of the recoverable coal reserve in Ohio is located in beds

               suited to underground mining [19]. No coal is extracted in Ohio's coastal

               counties.

                        Ohio ranked third among the Great Lakes states in oil production. The
               state produced 11,704,000 barrels of crude'petroleum in 1975 which was an
               increase of 2.6 million barrels over production in 1974-[319]. All coastal
               counties in Ohio are considered either oil or gas producing counties. In 1975
               twenty-five new producing wells were drilled in Ashtabula County. Eight of the
               wells produced natural gas, two produced oil, and fifteen produced both oil and
               .natural gas. Of the five new'wells drilled in Lorain County in 1975, four were
               dry and one produced gas [325  ]. Total oil reserves within the state amounted to
               87.3 million barrels. Total natural gas production in 1974 was 94.3 billion
               cubic feet [101 with gas reserves totaling 1,238.6 billion cubic feet [241.
                        0 Pennsylvania--Pennsylvania is the largest coal producing state in the
               Great Lakes Region. In 1974, the state produced 80.5 million short tons of
<pb n="323" />

                                                 303

          coal, which was.13.3% of the total U.S. production [327]. Coal deposits cover
          15,000 square miles or  approximately one7third of the state. The demonstrated
          coal reserve base in Pennsylvania is 31.0 billion tons. Approximately 95% of
          this reserve is.recoverable by underground mining methods. Seventy-eight percent
          of the total underground and surface bituminous coal reserve has a sulfur content
          less than 3%. Twenty-four percent-or 7.3 million tons of the coal has less than
          1% sulfur. Anthracite, a-high quality coal, is found primarily in Pennsylvania.
          This high Btu coal has an average sulfur content of 0.75%, which is favorable for
          compliance with air quality standards [586]. Anthracite-reserves are smaller and
          more difficult to recover than bituminous coal. In 1973 anthracite production
          was 6.8 million short tons or 8.2% of the total coal production in the state.
          Being higher quality coal, anthracite contributed over 10% of the total value
          from coal in.Pennsy lvania that year [586]. Erie County, Pennsylvania's only
          Great Lakes coastal county, has no reserves of coal.
                  Crude petroleum.production in 1975.was 3,910,000 barrels, an increase
          of 432,000 barrels over 1974 production figures [319]. Proved reserves were
          estimated at 35,.5 million barrels [24). Erie County had five crude oil wells in
          1974, which produced an insignificant 257 barrels [141.
                  Natural gas production was 82.7 billion cubic.feet in 1,974, which was a
          5% increase over the previous year. Gas reserves wereestimated at 878.5 billion
          cubic feet [24]. Erie County produced 64 mmcf of natural gas in.1974 [141.
                  e Wisconsin--As of 1976, Wisconsin has no known or projected production
          or reserves of oil, natural gas or coal.
                  Although producers of coal, oil and natural gas, the Great Lakes states
          are net-importers of energy. The role each state will assume in production of
          these fuels is contingent upon a multiplicity of'factors relating to recovery..
          technologies,* costs, availability, demand and fuel quality, Reserves of the
          mineral fuels available in the Great Lakes states are located primarily in.
          Michigan, Illinois, Pennsylvania and Ohio. Michigan and.Ohio hold 70% of the
          natural gas reserves. This reserve is insignificant relative to gas consumption
          in the region. The 2,279.8 billion cubic feet of natural gas reserves in Michigan
          and Ohio would supply about one-tenth of the yearly demand of.the Great Lakes
          states, which in 1972 consumed,.approximately 22,614 billion cubic.feet of gas
          [6181. The situation is similar for oil. Michigan and Indiana have 67% of the
          reserves, or 326.5 million barrels of oil. Consumption in 1972 was 1,752 million
          barrels of oil, which was five times the total reserves of the two states [6181.
<pb n="324" />

                                                     304

              Therefore, production of oil and natural gas in the Great Lakes states can meet
              only a minor portion of the demands.
                      Coal, which is the major f@el for the generation of electricity in the
              basin, remains in extensive reserve in Pennsylvania, Ohio, Indiana and Illinois.
              Pennsylvania and Illinois hold more than'75%.of the demonstrated coal reserve
              among these four states.   The Pennsylvania-Illinois reserve of 96.6 billion tons
              contributes substantially  to the demands in the Great Lakes Region. The future
              recovery of,coal from the  Great Lakes states hinges increasingly on the question

              of sulfur content. Great   Lakes coal will retain its traditional share of the

              market only if the cost of removing sulfur is competitive with the cost of
              delivering low sulfur western coal to thexegion. Great Lakes states coal
              production also faces higher mining costs as 85% of the demonstrated reserve
              would be recovered from underground mines.
                      The Great Lakes states produce no fuels for nuclear power generation.
              The states of Wyoming, New Mexico, Texas, and Utah are the principle U.S.
              producers of uranium, listed in,order of quantity produced [586]. Hydroelectric
              power, which contributes substaTitially to the generation of electricity, is
              assumed to remain fairly constan It because of the environmental cost of creating
              reservoirs and because the major  sites in proximity to load centers have been
              developed.

                           (3) Present Fuel Mix
                      The Great Lakes states consume approximately 46% of the Btu's produced
              by coal for fossil-fuels plants in the country. The eight states also consume
              27% and 4%, respectively, of the national supplies of oil and natural gas used
              for power production [547]. Table 52 describes the relative percentages of coal,
              oil and natural gas used for steam-electric plants in 1975. This table shows
              that 82.8 percent of the total Btu's produced by fossil-fuel facilities in the
              eight states were generated by coal.
                      The fuel mix for New York is  a reversal of themix for the other seven
              states. In 1975, New York used oil for 77% of its.electric generation needs.
              This percentage does not,properly reflect the fuel mix in the New York Great
              Lakes coastal zone. Coal-fired power plants account for about 70% of the power
              produced by fossil-fueled plants in the upstate coastal counties of New York [.289].
              The state figures on.fuel'mix are generally more representative of the dependence
              on oil in and around the New York City area.
<pb n="325" />

                                                                   305

                                                             TABLE 52

        PRIMARY ENERGY PURCHASE DATA FOR STEAM-ELECTRIC PLANTS DURING THE TWELVE MONTHS.

                                                              OF 1975

                                                                                            PERCENT OF            AVERAGE PRICE,
                                                   TOTAL BTU (BILLIONS)                      TOTAL BTU              PER 10 6 BTU
           STATE                   COAL                    I  GAS            TOTAL       COAL    OIL     GAS    COAL     OIL   I GAS
                                                  OIL

           ILLINOIS               688,793.7      44,970.2     29,438.0      763,201.9    90.3     5.9    3.9    75.4   153.5     113.1
           INDIANA                657,428.4      8,867.3      10,053.2      676,349.0    97.2     1.3    1.5    59.2   214.1     81.7
           MICHIGAN               505,464.0      95,488.7     32i82O.4      633,773.2    79.8    15.1    5.2    92.3   209.1     127.7
           MINNESOTA              157,825.9      4,872.4      15,173.7      177,872.0    88.7     2.7    8.5    62.3   196.0     63.9
           NEW YORK               143,624.5    526,  724.0    13,146.1      683,494.6    21.0    77.1    1.9   117.7   194.3     B7.4
           01110                 1,027,147.5     8,304.9        3,630.5    1,039,082.8   98.9     0.8    0.3    95.2   224.1     122.6
           PENNSYLVANIA           864,484.7      79,199.4          11.7     943,695.7    91.6     8.4    0.0    .95.5  210.9     146.7
           WISCONSIN              245,320.5      2,856.6      13,751.5      261;928.5    93.7     1.1    5.3    86.4   189,9     81.5

           GREAT LAKES
             STATES TOTAL        4,290,089.3    771,283.4    118,025.0     5,179,397.6   82.8-   14.9    2.3    85.3   196.0     101.9

                   [Source: "Annual         Summary of Cost and'Quality               of Steam-Electric Plant
                                  fuels 1975" Federal Power Commission]

                    The fossil-fuel mix figures for the seven remaining Great Lakes states
        reliablLy portray the general situation in the coastal.counties. This is
        especially true in Michigan in which.38 of the 45 f'ossil-fuel plants are located
        in the coastal counties. Many of the plants in the Illinois-@-Indiana coastal zone
        are designated as-coal/gas--@fired. The gas used is.a relatively small amount
        however, generally supplying fuel for peaking units or as start-up fuel for the
        large coal-fired boilers. The percentage of gas used in the coastal counties of
        this area does not greatly differ from the states' fuel mix consumption figure.
        An examination of kilowatts produced in the coastal counties of Illinois and
        Indiana show that approximately 4% of the fossil-fuel electrical generating
        capacity is'provided by natural,gas. Therefore a substantially'accurate extrapo-
        lation concerning fuel mix in the coastal counties can be derived from review of

        the statewide MIX.

                    The present fuel mix of the Great Lakes states depends                             on enormous
        quantities of coal. 'Ohio, Pennsylvania, Illinois and Indiana are the four
        largest coal consuming states for electric generation in the nation [547].                                         Oil
        and. natural gas are minor sources, of fuel in the region. In absolute terms
        though, the Great Lakes Region provides a substantial market for the national
        consumption of oil and natural gas.
<pb n="326" />

                                                       306.

                        Problems with the availability and price of natural gas make this-fuel
               increasing unreliable as a primary fuel for power generation. Demands for space
               heating and industrial applications   further remove natural gas from consideration
               as a primary  fuel for electric production.
                        Petroleum, another versatile fuel,  will most likely continue to decline
               in importance as a base load fuel   for power production.' The cost of petroleum is
               growing increasingly prohibitive,   but petroleum still has certain environmental
               advantages over coal-fired plants   and generally requires lower initial capital
               costs  for plant construction.
                       'Being more-limit,ed in its applications than oil or gas, coal will continue
               to be  the primary fuel for power  generation. New technologies.which utilize coal
               (i.e., fluidized bed, liquefaction and gasification, etc.) are aimed at reducing
               many of the detrimental  effects.of  coal-fited generation.
                        A developing trend suggests  that electricity will take up much of the
               slack left by reduceduse of oil and natural gas due to the end use versatility
               of electricity. However, the continuation of any such trend is.very dependent
               on the progress made in acceptable means of,utilizing coal for power production.
                        This issue hinges on the problem of sulfur. Changes in the amount of
               coal used depend on the development of efficient desulfurization technologies

               either before or after combustion.
                        Hydro-electric power currently comprises 5% of the region's generating
               capacity and is not expected to increase to any degree in the future. This type
               of generation is centered primarily in New York wh   ere it meets approximately  24%
               of the current state power needs [466].
                        The utilities have planned to increase nuclear capacity rapidly over the
               next twenty years to.the point where it will comprise some 30-35% of the total
               generating capacity. The continuation of this trend is predicated upon the
               resolution of many.serious problems currently plaguing the nuclear industry.
               These factors would include the   availability of fuel, a reduced construction
               period, a greater public acceptance, and a solution to the problem of nuclear
               fuel waste disposal. S.ome.seve,n or eight nuclear generating,facilities    in the
               Great Lakes Region  have been hard hit  by plant cancellations and deferrals.
               Those deferrals,.combined with the rising costs    and long lead.times for   construc-
               tion of nuclear facilities, indicate   a continued heavy r eliance on coal  over the

               next ten years or so.
<pb n="327" />

                                                  307

                  Nu'clear.facilities have grown-rapidly and now contribute 12% of the
          power generated'in the region. The future deve'lopmene of nuclear generating
          capabilities will'depend on the industryls-ability to     surmount the problems
          mentioned above. The relative price and availability      of the major fuels for
          electrical power generation will play a major role in     determining their future

          use.
                                                TABLE 53

               1975 Fuel Mix by Fuel Type for 11ower Generation (percent B.T.U. contributed
                 by  State)
                     State        Oil       Gas         Coal       Hydro       Nuclear
                     Illinois     8%        4%          63%         .1%           24%

                     Indiana      3%        2%          9 3%'        1 %           0%
                     Michigan    10%        6%          @2%         .1%           10%
                     Minnesota    3%        12%         63%          2%           19%

                     New York    39%        5%          15%         24%           17%

                     Ohio         4%        2%          94%          0%            0%

                     Penn.       14%        1%          74%          1 %           9%

                     Wisconsin    1%        9%          57%          1%           28%

                       Regional
                      Weighted
                      Averape    13%        @4%         66%         5%            12%

                      Source: FPC,  'NRC, FEA

                       (4) Cost and Use By State and Region
                  The  cost of primary fuels has increased greatly since the early 1970's.
          The most significant price increases have affected users of nuclear fuels and
          residual oil for power generation. The relatively greater increase in the price
          of these two fuels compared to coal indicate'coal's favorable cost position.
          However, the costs of transportation and insuring environmentally sound use of
          coal are expected to rise in.the future. For many reasons the price of.all
          primary fuels for power production are expected to rise in the future, with coal
          prices possibly rising least of all. The price     in 1975 for the four  primary fuels

          in the Great Lakes states was:
<pb n="328" />

                                                                      308

                                                       Coal          85(@/10 6  Btu
                                                       Nuclear       55 ,@/106  Btu*
                                                       Oil           196010  6  Btu          *Based upon U308 at
                                                       .Gas          102(,1/106 Btu            twenty.dollars/pound.
                    The costs of transportation,and extraction will play an increasingly larger role
                    in the future price of ele         ctricity.

                                    (5) Transport of Fuels for Power Production
                               The movement and distribution patterns of fuels for power production.in
                    the Great Lakes Region evolve through couplex interactions among the transporta-
                    tion mode, commodity, and the commodity's origin. Fuel movement and routing are
                    subject to constant change. Competition between fuel carriers insures a high

                    degree of    flexibility in the transportation pattern. It is through the existence
                    of such a network that fuels used in the Great Lakes Region can originate from
                    such diverse areas of the country as the Louisiana Gulf Coast or the Nor                       th Slope

                    of Alaska.

                               Historically, coal, oil and natural gas have been transported by rail,
                    waterway, truck or pipeline throughout the Great Lakes states.
                               The railway system is comprised of more than 200,000 miles of track,
                    with the greatest concentration existing in the eastern half of the country.
                    Coal, as a high bulk commodity, is well suited to transport by rail. @Railroads
                    haul 78% of the coal and less 'than 3% of the oil and gas in the country [3641.
                    Recent innovations, particularly the advent of unit trains, have substantiall-
                                                                                                                          y
                    lowered the costs of hauling large volumes of coal. Approximately 20% of all
                    coal mined in the United States presently movesby unit train [147]. The unit
                    train "consists of a dedicated set of haulage equipment loaded at one origin,
                    unloaded at one destination each trip, and moving in both directions on a pre-
                    determined schedule.         The unit train combines three principle factors: design
                    efficiency, equipment        balance, and intensive use. To achieve the lowestpossible
                    transportation costs,        all elements of the operation must be i             n balance; the
                    loading, haulage, and        unloading facilities must be designed and scheduled for
                    intensive use but not        to a degree that would bring intolerable maintenance costs;
                    the haulage capacity must be in balan            ce with supply, with the consumer's needs,
                    and With amortization requirements" [3101.
<pb n="329" />

                                                                                                          TABLE 54

                                                                                                                 IC FUEL FIGURES
                                                                                          STEAM-ELECTR

                                                                                              MARCH 1975-FEBRUARY                   1976

                                                                   New York          Penn.         Ill.          Indiana Mich.                Ohio       Wis.          14.1nn.                TOTAL

                                                                                                                                                                                                           3
                                       1975 oil delivery           86,128        13, 105          7,365         l.'530      15,879           1,373            471           773           126,624 x 10    bbl
                                       Avg. cost/bbl               $11. o        $12.74         $12.16        $112.41-      $12.36        $13.90         $11.24        $12.35
                                       Number of reporting         22            31-            15            13            14            25             8             10                      160
                                       plants
                                       Percent of total            77.1%         8.8%     -     5.4%          1.2%         114.6%         1.2%           1.22          2.4%               14.6%
                                       -A-TU                                     36,733.3       33,499        30,968        21,361        46,860         11,552          8,797            196,242 x 1()31
                                       1975 coal delivery            5,972                                                                                                                                   tons
                                       Avg. cost/ton               $28.31        $22.45         $15.28        $12.57        $21.84        $20.86         $18.35        $11.18
                                       Number of reporting
                                       plants                      10            27             25            26            25            35             18            17                  183
                                       Percent of     total        211%          91.1%          90.67.        97.14%        80.1%       1 94.17          94.1%         89.6%               83.1%
                                       Btu
                                       Gas                                                                                                                                                   2.3%
                                       Total energy used
                                       for power plants            11.9,016 160,037            143,361        124,402        101,323      188,818        46,679        35,965             911,000
                                       in bbl@.q,j,x 103
                                                     Ma I Pnt-)                                                                                                  -

                                                             Compiled    from FPC data.
<pb n="330" />

                                                       310

                        Unit trains in the Great Lakes Region have primarily hauled coal to the
                consumer directly'from the mine.   Unit train rates were developed through major
                long-term contracts for all rail  coal movement from mine to consumer. Railroads
                ,have been unwilling to offer such rates to portsand terminals. Rail companies
                would naturally prefer to contract for coal movement to the final destination
                rather than short-hauling for transshipment to lake carrier. The Lake Carriers
                Association recently received a favorable ruling concerning the establishment of
                unit train rate's to the Lake Erie ports. Additional litigation on this-matter is
                expected. Unit train transportation is not excluded from all ports on the Great
                Lakes. Of,notable exception is the transshipment facility in Superior, Wisconsin.
                Unit trains 100 cars in length are loaded in Montana and hauled 800 miles east to
                deliver 10,000 tons of western coal to the coal transshipment facility at Superior.
                Operations of this sort represent a significant improvement in the historical
                .transportation of coal by rail.
                        Rail transport of coal, traditionally parochial in nature, is expanding
                to markets well beyond the regions of production. Efficient utilization of rail
                transportation on this scale.relies on rapid turnaround time in loading and un-
                lo,ading as well as, stable and well constructed road beds capable of withstanding
                the stresses of 10,000-ton unit trains.
                        The shipment of coal by rail accounts for 57% of 'the total coal movements
                for electric utilities in the Great Lakes states. The two largest coal consuming
                states in the country, Ohio and Pennsylvania, move 34% and 36% of their coal   for
                electricity by rail [604]. The rail network, although extensive in these states,
                competes with the inland movement by barge and truck to utilities. However, it
                should be stressed that these competing modes of transportation occur largely
                outside the Great Lakes Basin. Some of the largest,coal mines are located near
                the Monongahela and Ohio Rivers, which assume a large portion of the coal
                traffic by barge. Economical movement by truck is generally restricted to the
                regions of coal production located well inland of the coastal counties.      There-
                fore, the rail system, unencumbered by the geographical and economic restraints
                affecting river or truck transportation, primarily serves the coal demands of the
                Pennsylvania and Ohio utilities located in the coastal counties along Lake Erie.
                        Illinois and Indiana are also large producers of coal. The percentage of
                rail transport for electric utilities is considerably greater in these midwestern
                states than in Ohio and Pennsylvania. Indiana and Illinois move better than two-
                thirds of the coal used for electric power generation by rail. This traffic
<pb n="331" />

                                                  311

         supplies fuel for the enormous industrial and residential power demands in the
         Lake Michigan coastal counties.of Illinois and Indiana. More than half of the
         coal moved by rail for electric utilities is produced within'the states' borders.
         Recently the influx of low sulfur western coal has taken a larger share of the
         coal movement by rail. Thirty-eight percent ofthe rail movement to Illinois
         originated in Montana and approximately 15% of Indiana's coal for electric power
         generation was produced in Wyoming. As demands for low sulfur coal increase, rail
         traffic can be expected to realize an even greater share of the coal transporta-

         tion market in Indiana and Illinois.

                 The four northernmost Great Lakes states of Minnesota, Wisconsin,

         Michigan and New York are north of the bituminous border that runs through
         Illinois, Indiana, Ohio and Pennsylvania. The northernmost states must import
         virtually all their fuel supply for electric power generation. The transportation
         sector, particularly the railroad industry, benefits from this situation. -This
         is especially true in Minnesota and New York, whose geographic location have
         historically precluded extensive coal traffic on the Great Lakes. In 1975 over
         80% of the coal used by utilities in Minnesota was transported by rail. All but
         15% of this coal was mined in Montana. New York similarly received approximately
         80% of the coal delivered to utilities by rail. This     coal was mined primarily in-
         eastern Pennsylvania and West Virginia. Although the     percentages for rail traffic
         are high in these two states it should be noted,that'the total tonnage of coal

         consumed by utilities in New York and Minnesota are the*lowest of the Great Lakes
         states. Combined, these s   tates consume only about 8% of all.coal use for electric
         power production in the Great Lakes states. Michigan and Wisconsin consume more
         than twice the coal used in New York and, Minnesota. Here again rail transporta-
         tion is the dominant method of coal movement. These states, however, are well
         suited for coal transport by lake vessel. Consequently, rail shipments to
         Michigan and Wisconsin constitute a slightly smaller portion of     the total coal
         movement than in Minnesota and New York. In 1975, Wisconsin received 66% of its.
         coal for electric utilities by rail. Most of this coal originated in Illinois
         and Kentucky., Almost 30% of this fuel was mined in Montana or Wyoming and
         transported by rail. Eastbound rail movement from Montana and Wyoming can be
         expected to increase in the near future. Two p    lanned power facilities in
         Wisconsin's Lake Michigan coastal counties, Edgewater and Prairie View,
         anticipate delivery of western coal by unit train. Although Michigan has      more
         shoreline than the remaining seven Great Lakes states, rail movement comprised
<pb n="332" />

                                                     312

               71% of the total coal shipments in 1975., More than 80% of this rail movement
               originated in Ohio and West Virginia. The dominant position of rail over water
               transportation in Michigan can bepertially attributed to the locations of the
               major load centers in the southern portion of the state. The growth of unit
               train movement directly to utilities1n the Detroit area has affected the tradi-
               tional short haul by lake vessel from the coal loading ports on Lake Erie.
                       Railroads, as previously mentioned, prefer to control the commodity's
               transportation from mine to consumer. They are not, however, interested in totally
               displacing the coal commerce of the lake carriers. Each major coal shipping port
               is serviced by a particular rail company which delivers coal to the facility.
               An extensive rail network supplies the lake ports with coal for.transshipment to
               the waterways. Other rail companies not directly serving the ports may do so
               indirectly by delivery to a number of inland "turnover points" where coal is
               transferred to the rail company serving a port for final delivery. The
               Louisville and Nashville Railroad Company indirectly serves many of the Lake
               Erie coal ports in this manner.
                       This symbiotic relationship with railroads is necessary for economical

               coal movement by lake carrier.  Michigan and Wisconsin are the only Great Lakes
               states that receive appreciable tonnages of coal by lake vessel. In 1975,
               Michigan received 29% of the coal for electric power generation from Great Lakes
               vessels. Approximately 40% of the lake traffic to Michigan originated in West
               Virginia and Kentucky and was transshipped via the Lake Erie ports [604]. The
               coal destined for Wisconsin ports primarily originated in the midwestern coal
               fields of Illinois, Indiana and Kentucky and moved onto the lakes through the
               port at. South Chicago. This movement of coal has diminished almost by half over
               the last ten years.
                       Western coal, notably from Montana, is presently taking a larger share
               of the coal movement on the Great Lakes. Originating from a new transshipment
               facility in Superior, Wisconsin, western low sulfur coal traffic on the Great
               Lakes represents a reversal of the traditional patterns.of movement by lake
               carriers. Historically, iron ore and coal have been complementary commodities
               for dry bulk transportation on the Great Lakes. Vessels hauling iron ore down-
               bound from Lake Superiorto  Lake Erie could reload with coal for the return
               upbound passage.
                       The advent of western coal movement on the lakes complicates this
               traditional commodity exchange flow. The additional coal traffic from Lake
<pb n="333" />

                                                  313

           Superior has spurred construction of new  bulk cargo vessels. The dimensions of
           new vessels on the Great Lakes are increasing with the capacity of the locks to
           accommodate them. The completion.of the'Poe Lock    at Sault Ste. Marie in 1970
           increased the limitations on'vessel dimensionsto     1,000 feet length and 105 feet
           beam. This development permits construction of vessels    with a carrying capacity
           over 56-.000 tons or'approximately twice as much'as any  prior lakers [2511.
           Although the number of commercial vessels on-the Great   Lakes has decreased by
           .one-half since 1960, the increased capacity of vessels  presently on the lakes has
           compensated for this'decline so that there is a.total   decrease in carrying
           capacity of only 10% [2901.
                   The extension of the-shipping season on the  IGreat Lakes may also  have a
           minor impact on the waterborne movement of coal. Coal is    generally stockpiled
           on site in quantities sufficient for the demand over the winter months.     The
           beneficiaries of.an extension in the shipping season would most likely be the
           smaller, older shoreline plants located primarily on the-western-shores of Lakes
           Michigan and Huron. These utilities with smaller storage.facilities must
           presently supplement winter stockpiles with deliveries by rail. With season
           extension the percentage increase in coal tonnage shipped on the Lakes would be
           less than 5% [243].
                   take vessels also transport crude  petroleum and petroleum products. The
           development of an extensive pipeline network throughout the region has substan-
           tially reduced tanker transport of these liquid fuels. Petroleum, a minor fue    1
           commodity for electric power generation in the coastal counties of the Great
           Lakes, can be expected to continue to decline in movement on the Lakes with
           additional pipeline construction in the region. The heavy fixed investment and
           economies of scale are cited as reasons for the favorable share of the market
           assumed by pipeline transportation [147]. The possible movement of oil onto the
           lakes by ocean-going tanker is restricted by the limitations of the St. Lawrence
           Seaway and the connectin g channels,of the lakes.
                    On a much smaller scale there is barge movement of  oil on.the lakes for
           power production. Specifically, the oil-fired energy facilities in Oswego,
           New York, receive oil by barge. Originating from oil storage facilities in
           Montreal, barges supplied the Niagara-Mohawk Oswego facilities with.approximately
           4.5 million barrels in 1975. Coal is also transported by barge. The Common-
           wealth Edison Company uses barges to deliver four to five   million tons of coal
           per year to electric facilities in and around  Chicago. Low sulfur western coal
<pb n="334" />

                                                       314

                is transported,by tail to a transshipment poi nt on the Illinois River   near
                Peoria. Barges move up river delivering 1,250 to 1,450 tons 'of coal per barge.
                The Conmonwealth Edison Company has long been committed to this method of coal
                transportation and anticipates continued use of barges for fuel transport.
                        Movement of crude oil by pipeline is routed from Duluth-Superior through
                Michigan to Sarnia, Ontario, and another line from the same origin runs parallel
                to the western shore of Lake Michigan around the southern end of the Lake and
                across Michigan to Sarnia. Additional supplies of crude are delivered from the
                Gulf region to the major refining facilities along the Illinois and Indiana
                region of Lake Michigan. Refined products from refineries throughout the Great
                Lakes states are transported via a major  refined products pipeline network
                concentrated in the major industrial load centers throughout the Great Lakes
                Region. Pipelines can also carry a coal slurry. Finely pulverized coal can be
                mixed with water and pumped through a pipeline at.about three and one-half miles
                per hour. At the destination point coal is removed from the water by a filter.
                A coal slurry pipeline once delivered coal to the Cleveland area. Completed in
                1958, operations ceased in 1963 when railroads lowered their rates to compete
                with the line. Future development of coal slurry pipelines is presently
                constrained by the inability to acquire legal rights-Of-way across private
                property, particularly railroad property. These pipelines also require consi-
                derable quantities of water for the slurry mix. Availability of water is a major
                limiting factor to the development  of slurry lines.

                        b.  Electricity

                            (1), Power
                        Use of electricity is growing faster than use of  any other form of energy
                in the United States. While the national average growth   of energy consumption
                was 4.8% per year from 1961-1972, the growth in electrical energy consumption
                grew at an annual average rate of 7.3%, or doubled approximately in 10 years.
                [576). A continuation of this  rate would require approximately an eight-fold
                increase in the present generating capacity, transmission capability and fuel
                requirements by the year 2000. Improved efficiencies would slightly reduce the
                magnitude of this increase. Though the amount of fuel would necessarily increase
                proportionately, the mixture of fuel types used for power production has and will

                continue to change.
<pb n="335" />

                                                      .315

                                                    TABLE 55
                     U.S. DISTRIBUTION OF ENERGY CONSUMPTION BY:TUEL AND BY SECTOR

                     Fuel                                        1968           1973

                     Coal                                        22%            18%

                     Petroleum                                   44.2%_         46%

                     Nuclear                                       .2%            1%

                     Hydro                                        1.3%            4%

                     Natural Gas                                 32.3%          31%

                             [5761

           Broken down further    by sector use (1968) Office of the Secretary         of Transportation

            report,  relative -importance of energy      source:

                     Sector                       Coal   % Gas %    Pet.  % Elec. %      Total

                     Commercial                     8.3    26.8     49.2      15.7        100

                     Industrial                   26.2     43.3     20.9       9.6        100

                     Transport                      ..l      4.0    95.8        .1        100

                     Residential                           50.1     34.8      15.1        100

                    For the period 1971-1975 annual      growth in net electricity produced.varied
          from a high of 8.6% during 1971-1972 to        a low of 0.4% for the 103-1974. The
          average for the 5"year period was 5.1%,        with the growth rate during 1974-1975
          being 2.6%.. These are national electricity production figures which should not be
          confused with the increase in installed        generating.capacity, which (over the 5-year
          period) increased at an average annual rate of 8.2%. These statistics reflect
          fairly accurately the conditions of.the        eight Great Lakes states.
                    Nationwide, the production of electricity accounted for over 25% of the'
          primary energy    consumed annually. The electric       utility sector's demand for energy
          is.growing faster than that of any other sector, at approximately 8% per year
          (pre-1973). Since the Arab oil embargo of 1973, the utility,sec.tor's demand for
          energy has lessened-in response decreased consumption of electricity, due to such
          factors as the increased cost of power and the depressed state of the economy,
          As will be seen further on in the study, assessing future demand for electricity
          is a most difficult task. The historical growth rate of approximately              7% is
<pb n="336" />

                                                          316

                no longer assumed to be the case in the post-1973 world of higher energy prices,
                capital shortages, conservation measures, and economic misfortunes.
                         The economic growth of an area will often indicate a rapid rise in the
                demand for electricity. Similarly, the growth in population and its electric
                energy consumption habits will greatly influence the demand for electric power.

                                                       TABLE 56

                                 CONTRIBUTION OF EACH FUEL'TO    THE UTILITY SECTOR

                                                        U.S.
                                    10 6kwh
                                    prod.        Coal     Oil     Gas   Nuc.    Hydro.
                             1960                57.3%      9.5   26.1            7.1

                             1973   1,859,120    45.7%  . 16.8    18.3  4.5     14.6
                             1974   1,854,847    44.5%    16.1    17.2  6.0     16.1
                             1975   1,908,784    44.6%    15.1    15.7  8.7     15.7

                             Electric use growth rate (1973)

                             Residential         8.2

                             Commercial          9.6

                             Industrial          5.8

                             Transportation      -

                             Electricity demand  by sector (1973) (%    used)

                             Residential         32%

                             Commercial          22%

                             Industrial          42%

                             Other uses            4%
<pb n="337" />

                                                                          317

                                   (2) Populatioh
                                   '@ically, population has been growing at a rate of 15% per decade, and
                           Histor
               for the last few years the U.S. population has been                               growing at an annual rate of
               just under 2% [U.S. 1975 statistical abstract]. In,                              comparison, the power gener-
               ating capability in the U.@S. since 1955 has been growing at an annual rate of
               approximately 7%. This indicates to some degree the increasing consumption of
               energy per capita in the U.S.                     Tables 57 and 58 indicate the growth in energy
               consumption that has taken place in the last few decades.

                                                                       TABLE 57

                                                        PER CAPITA POWER GENERATION

                                                                                                  Total Power
                                             Pogulation     Kilowatt-hours. Installed Kw          Generated*
                             Year          (10 people)       per capita          per capita       (109 Kw-hr)

                             1955             164                3853              0.44               633

                             1960             180                4718             --0.53              849

                             1965             194                5969              0.68             1157-

                             1970             205                8100              0.93             1660

                             1975  (est)      221               10450              1.19             2310

                             1980  (est)      2,31               14000             1.60             3300

                                                                              [U.S. Statistical Abstract]

                                                                      TABLE 58

                                             TOTAL AND PER CAPITA ENERGY                 CONSUMPTION

                                                                          Total           Per Capita
                                                                        10 12  B.T.U.)     (10 6B.T.U.)

                                                  1920                    19,782               182

                                                  1930                    22,288               181

                                                  1940                    19,107               181

                                                  1950                    34,153               226

                                                  1955                    39,956               243

                                                  1960                    44,816               249

                                                  1965                    .53,969              278

                                                  1970                    67,143               330

                                                  1974                    73,121               346

                                                                                   [U.S. Statistical Abstract, 19751
<pb n="338" />

                                                                                 318

                                  The preceding tables illustrate the growth in energy consumption in the
                      U.S. As population growth begins'to level off in the future, demand for energy
                      can be expected to continue increasing, although at a reduced rate.
                                  The projected population              of the U.S. as of July, 1976, is 211,909,000.
                      At the same time the populations                  of the states within the Great Lakes Region,

                      were:

                                                      N.Y.                                 18,111,000
                                                      Penn.                                11,835,000
                                                      Ind.                                  5,330,000

                                                      Ill.                                 11,131,000

                                                      Ohio                                 10,737,000
                                                      Minn.                                 3,917,000
                                                      Wisc.                                 4,566,ooo
                                                      Mich.                                -9,098P00O
                                                                                           74,725,000

                      The Great Lakes states contain 35.27% of the                         total U.S. population. Of the states
                      in the Great Lakes Region, the coastal zones                         (figures by counties) comprise 26%
                      or .19,415,897 of the total population of the                        eight Great Lakes. states. Table 59
                      shows the population'o.f the states' coastal                       zones as of July, 1975.,

                                                                            TA BLE 59

                                                 GREAT LAKES STATES POPULATION BY COASTAL ZONE

                                                                                                                Percent
                                                           Number of       Coastal Zone     Total State ,Population in
                                                           Counties          opulation      Population       Coastal zone
                                            N. Y.              10          2,696,600        18,111,000           i4.89

                                            Penn.               1            273,780        11,835,000             2.31

                                            Ind.                3            749,000          5,330,000          14-03

                                            Ill.                2          5,765,700        11,131,200           51.8
                                            Ohio                8          2,855,700        10,737,000           26.6

                                            Minn                3            233,500                  -            6.34

                                            Wisc..             15          1,928,400,         4,566,000          42.23

                                            Mich.              41          4,898,200          9,098,000          53,83

                                                                                                (U.S. Census Bureau]
<pb n="339" />

                                                  319

                   Major'changes-in the-p6pulations' of the eighe,"Great Lakes states do not
         @'appear-likely; What does-'appear to be happening within th&amp;states is the
          continued growth, in both numbers-arid density, of the Various Standard Metropoli-
          tan Statistical Areas around the large cities. The growth of these areas has
          implications for the concentrating-of the utility's-load centers. This concen-
          tration of population and load centers around-the large metropolitan areas will
          affect the siting of facilities@and the flow of electric power in and out of the

          Great Lakes coastal zone.

                       (3)_ Power Flows in the Great Lakes Coastal:Counties
                   The relationship of el6ctical power flows moving,in and out of the
          coastal  counties is a major considerati6n in attempting to assess the importance
          of electric generating facilities in the future. Power flows in and out of the
          coastal counties are fiot'constant with respect to both'direction and amounts.
          Further, once electricity leaves the generating unit it is' virtually impossible

          to determine its final destination.

                   Electric power flows-within  the  co.astalcounties.of Lake Michigan are
          easily*defined on a large scale. On    thesimplest level,  powergenerated in rural
          coastal counties flows inland from the coast, whereas power   generatedin urban-
          metropolitan coastal areas is generally consumed within    the coastal counties.
          Beyond these simple observations, el  ,ectrical energy flows vary according to
          region and are a function of a particular power pool's varying requirements.
                   The Michigan Electric Power Pool   a combination of Detroit Edison and
          Consumers Power Co.) regulates electrical flows throughout   the state, constantly
          monitoring loads, @osts  'of power generation, and related factors in the effort
          to provide the lowest cost, most efficiently derived electric power.      Given that
          power flows within the state are not the same on any two days,-attempts to
          specify coastal counties' electrical energy flows.are impractical. However, what
          can be determined is the direction of average flows for large cities near the

          coast.

                   Generally, electric,power  flows into cities such as Detroit, Chicago, and
          Cleveland. The Chicago area has more than 5 million people living in.its two

            Communicatio n, Michigan Electric Power Pool.
<pb n="340" />

                                                      320

               coastal counties-and only four coastal power generating units.   The Chicago
               metropolitan region-is the load 'center for Commonwealth Edison, whose service
               area extends over most of northern I-11inois. For the Chicago region there is a
               constant need to bring electricity into the coastal counties, predominantly from
               the-south and west.   With-the difficulty of obtaining sufficient coastal
               properties within the Commonwealth Edison Service Area and transmission rights-
               of-way in the metropolitan area, additions to generating capacity which involve
               new coastal sites would seem unlikely, so there will be a.continued reliance on
               noncoastal zone electric power supplies.
                       The Detroit Edison Company, with  a service area of 7,600-square miles, is
               an example of a utility with its primary  load center and a high percentage-of
               generating capacity located in the coastal zone.     The generating facilities
               located within the Detroit metropolitan coastal counties produce power less
               efficiently than those located on the St. Clair River and Lake Erie, so that on
               light load days only 10% of Detroit's power is generated within the metropolitan
               area, the other 90% coming from the north and south. On heavy load days., only
               75% of Detroit's-power comes from these areas, because the output from the
               inefficient Detroit plants is increased. The St. Clair River, Detroit River,
               and Lake Erie generating facil ities are largely located in the coastal zone,
               making intracoastal power flows predominant in the eastern Michigan area.
                       With a service area of 1,700 square miles, Cleveland Electric Illuminat-
               ing Company has both a very concentrated load.center and, by comparison to
               Detroit Edison and Consolidated Edison, a concentrated service area. The

               Cleveland municipal plant has the ability to generate 90% of the portion of
               the needs in its,service areas. However, there are three generating facilities

               that produce with greater efficiency and at,lower cost most of the metropolitan
               areals,needs.     Cleveland Electric Illuminating Company's generating facilities
               are closer to its load center than either Detroit Edison or Commonwealth Edison,
               with the major plants located close to Lake Erie. As with Detroit Edison, the
               power which Cleveland Electric Illuminating Company generates is consumed within

               the coastal zone.

                  Communication, Commonwealth Edison.

                  Communication, Detroit Edison.

                  Communication, Cleveland Electric Illuminating Company.
<pb n="341" />

                                                     321

                    The Milwaukee metropolitan area is the largest-consumer served by the
           Wisconsin Electric Power Company. The area's industrial sector uses approxi-
           mately two-thirds of the power produced by the utility. This high percentage
           reflects the heavy industrialization of.the Milwaukee area. The electric power
           is generated on the coast, with much of this within the Milwaukee metropolitan
           area.    The remainder of the Milwaukee base load is generated in the coastal
           zone north of Milwaukee at the Point Beach.plant      (this assumes the Oak Creek
           plant to be in the Milwaukee metropolitan area). The power flows for Milwaukee

           are intracoastal.

                    More power is produced within the coastal zone of New York      than is
           consumed locally. The inland location of many New York population        centers,
           combined with the difficulty of siting power facilities in many parts of the
           state, suggests the reason for intensive energy facility siting in       the coastal
           zone. Generally, power flows from west to east in New York State.         Areas such
           as Oswego are rapidly:becoming major energy exporting centers. The        number of
           power plants and transmiss   ion facilities existing and being planned    suggests the
           importance of the coastal'zone in supplying inland areas with large       blocks of
           power [449]. (For example, utilities such as Long Island Lighting        Company and
           Orange and Rockland Utilities, Inc. are joining in construction of       Oswego area
           power facilities.)      The Niagara Falls-Buffalo area produces large amounts of
           power,-but due to heavy industrialization, exports smaller quantities of electri-

           city to more eastern areas.
                    The variations that have developed in electrical energy produced in
           the coastal zone and its end use are the result of the needs of the regional
           power pools, availability of facility sites and transmission line rights-of-way,

           and location of fuel and water resources.

               Communication, Wisconsin Electric Power Co.

               Communication, New York Power Pool.
<pb n="342" />

                                                     322

                                  -- --- --------

                  3. EXISTING ENERGY SUPPLY FACILITIES

                      a. Electrical Generation

                          (1) Types by State and Region
                      The types of generating facilities in  the Great Lakes region are currently
              reflected in the region's fuel mix, described  in Section IV.B.2.a.(3). The
              average capacities of the different types of facilities varies. Modern nuclear
              facilities average between 900-1000 MW each whereas most coal-fired units are
              around 600 to 800 MW. The majority of hydroelectric and gas facilities are quite
              small and are often used for,peaking purposes.
                      The locational requirements for the different generating types varies
              considerably, according to fuel types. Hydroelectric facilities have the most'
              obvious restrictions as to where they may site. These restrictions suggest a
              limited future role for hydroelectric power. The possible exception to this
              would be a further development of pumped storage facilities, but these also have
              very stringent locational restrictions.
                      A primary'siting consideration for fossil-fuel,plants is the location of
              existing or planned fuel transportation. In the past few years environmental
              considerations have become a major factor in determining the location of a
              fossil-fuel generating plant. Air quality.regulations are especially pertinent
              to coal-fire,d facilities. In addition to.environmental and fuel considerations,
              fossil-fuel plants have and will continue to locate where water is available.
                      The location of nuclear facilities has been dictated by two primary
              considerations: (1) availability of water, and (2) availability of enough land
              for the, required zone of exclusion. Fuel transportation is not a major considera-

              tion in the location of nuclear facilities.

                      There does not appear to have been a preference of one fuel type over
              another in locating in the coastal, zone. Recent trends, however, suggest that a
              higher percentage of nuclear,facilities have and will be located in the coastal
              counties. Future preference for locating in the coastal zone will be dictated by
              the following considerations: (1) water availability, (2) access to fuel transport
              routes, (3) environmental quality standards, and (4) land in sufficien t quanti-
              ties for exclusion areas. The following shows.a rough breakdown of the quantity
              of each state's generating capacity.
<pb n="343" />

                                                 323

                  Table 60     POWER GENERATION BY STATE

                  ILLINOIS

                  Elec. produced 94,480 GWh
                  Installed gen. cap. 25,942 MW [F.P.C.  News June 4    12/31/751
                  Gen. cap. in C.Z.    3267.25 MW [322]
                  % of total cap. in C.Z.    12.5%
                  Future scheduled or planned gen. cap. 16,880 (planned through 1984)
                  Planned expansion in C.Z.    None

                  WISCONSIN

                  Elec. produced 35,063 GWh
                  Installed gen. cap. 8,881  NRC
                  Gen..cap. in C.Z. 5574.3 MW
                  % of total cap. in C.Z. 59.6%
                  Future scheduled or planned gen. cap. 5333 MW
                  Planned expansion in C.Z. 1,560 MW

                  MICHIGAN
                  Elet. produced 72,074 GWh
                  Installed gen. cap. 18,926 MW
                  Gen. cap. in C.Z. 17229 MW

                    of total cap. in C.Z. 73%
                  Future scheduled or planned  gen. cap.'10232 MW
                  Planned expansion in C.Z. 9557 MW (include D.C.,Cook  unit 2)

                  OHIO

                  Elec. produced 105,665 GWh
                  Installed gen. cap. 25,225  MW
                  Gen. cap. in C.Z. 5514.4 MW"
                  % of total cap. in C.Z. 21%
                  Future scheduled or planned cap. 10,077 MW
                  Planned expansion in C.Z. 5,300 MW

                  INDIANA
                  Elec. produced 65,421 GWh
                  Installed gen. cap. 13,315 MW
                  Total cap. in C.Z. 2,918.956 MW
                  % of total cap. in C.Z. 20.4%
                  Future scheduled or planned gen. cap. 6,516 MW
                  Planned expansion in C.Z. 685 MW (nuclear) (indef.)
<pb n="344" />

                                                        324

                       MINNESOTA
                       Elec. produced 28,289 GT&amp; [F.P.C.-I
                       Installed gen. cap. 6,707 M-
                       Gen. cap in t.Z. 324.329 MW
                       % gen. cap., in C.Z. 5%
                       Future scheduled,or planned    gen. cap. 2,,820 MW
                       Planned 'expansion in C.Z. -   None.

                       PENNSYLVANIA

                       Elec. produced 111,762 GWh
                       Installed gen. cap. 28,770    MW
                       Gen. cap. in  C.Z. 118 MW [3221
                       % of total cap.   in C.Z. .4%
                       Future scheduled   or planned  gen. cap. 13,120 MW
                       Planned expansion in C.Z. 800 MW

                       NEW YORK

                       Elec.. produced 109,521 GWh
                       Installed gen. cap.,29,500    MW [F.P.C. Jan. 1, 1976]
                       Gen. cap. in C.Z. 7,968 MW
                       % of total cap.., in C.Z.  27%
                       Future scheduled or planned    gen. cap.  15,829 MW [F.P.C.   Jan.. 1, 19761
                       Planned expansion in C.Z.    (1100 Nuc)  3,950 MW

                          .(2)- Electrical   Transmission

                       With the development   of the  electric  reliability councils during the
              mid-1960's @the electrical transmission network within the Great.Lakes Region has
              become.increasingly reliable. A primary function of these councils is to promote
              the comprehensive.planning of both generating facilities and transmission net-
              works-Theireliability councils have helped to coordinate overall design of the
              transmission grid for the purpose of balancing power flows between load centers

              and the generating units,,the sharing of power between utilities, and the overall
              efficient operation of,,the region's generating capacity. Further, inter-utility
              buying and selling of power has been encouraged by the development of a compre-
              hensive transmission networki One benefit of pooling power is the reduction in
              generating capacity needed by an individual utility to compensate for emergency

              generating outages or days of extra heavy load.
<pb n="345" />

                                                 325

                   The development of power pools such as the Michigan Power Pool or CAPCO
           was predicated-upon the ideas of sharing and coordinating resources and providing
           the least expensive power possible. The practices of the utilities and power
           pools have become very complex, such that at any given time it is nearly impos-
           sible to determine the,destination of locally generated power. With the develop-
           went of inter-utility electric reliability.councils and power pools, the siting
           of new generating units is no longer heavily dependent upon proximity to large
           load centers. To assure transmission line stability and interregional power
           reliability, some new generating uni ts may locate outside of the general proximity
           of large load centers.
                  The development of a comprehensive and efficient transmission network has
           increased the flexibility in energy facility siting. The.D.C. Cook nuclear
           .facility, located in Michigan and owned by the Indiana and Michigan Power Company,
           is a good example of a generating unit able to locate hundreds of miles from the
           load areas it serves, due to the availability of an efficient long distance
           transmission network. Cooling water from Lake Michigan was the primary reason
           for the selection of the Michigan site, while the EHV (345 and 765 kV) transmis-
           sion network made it economically feasible to serve the widely dispersed demands
           of the American Electric Power grid.
                  The bulk transmission system of the region is predominantly comprised of
           345 kilovolt (kV) lines. The use of high voltage transmission lines allows large
           transfers of power at a very high efficiency. The overall efficiency of the

           electric transmission network is lowered each time the power is stepped down to
           a lowercapacity'line, so it is beneficial to transmit power along the higher
           voltage power@lines over long distances. Future transmission network plans call
           for the development of 765 kV transmission lines which will allow the transfer of
           more power at a higher efficienc y than that of the 345 kV lines. The 765 kV
           network presently operating in the Great Lakes Region is currently transmitting
           the power generated at the D.C. Cook facility to the southwestern Ohio region.
           The trend in transmission lines is towards larger, more efficient lines. A
           continued emphasis is being place d on reliability and coordination of the entire
           generating-transmi'ssion system.
<pb n="346" />

                                                    326

                     b.  Fuel Transshipment and Storage

                         (1) Facility Type and Size
                     Ports on the Great Lakes have shown a pattern of growth and development
             towards efficient,and rapid handling of bulk commodities. Rapid growth in many
             phases of transportation, particularly those concerned with the handling of bulk
             commodities, forced the gradual disappearance of the old general cargo facility.
             Typically located close to the downtown metropolitan area, these ports became
             obsolete due to increasing demands for extensive land areas, access to major rail
             facilities, waterfront dockage capable of accommodating larger vessels, and
             closer proximity to outlying industrial complexes.
                     Bulk cargo terminals are designed specifically to handle materials such
             as grain, ore, coal and oil efficiently and quickly. Fuels, coal and petroleum
             products account for a significant portion of the bulk commodity trade on the

             lakes.

                              (a) Coal

                     In 1974 the 35 million tons of coal shipped on the Great Lakes accounted
             for about 17% of the total foreign and domestic freight shipped on the lakes.
             This was the third largest single commodity handled that year. Coal is shipped
             from three primary regions on the Great Lakes: southern Lake Erie, south Chicago,
             and Superior, Wisconsin. Together these ports shipped over 95% of the totallake
             coal traffic in 1975 [2901.
                     The Lake Erie coal ports of Toledo, Sandusky, Lorain, Conneaut, and
             Ashtabula transship coal originating in West Virginia, Pennsylvania and Ohio.
             The combined tonnage of coal shipped from these ports was over 33 million tons,
             or .85% of all coal shipments on the Great Lakes in 1975 [290]. This massive
             commodity shipment is partially counterbalanced by receipts of iron  ore from
             mines in the upper Great Lakes for.use in the iron and steel industries located
             along the Ohio River and its tributaries. The ports developed as the gateways
             for coal demanded by,northern utilities and industries and iron ore demanded by
             foundries in Ohio and Pennsylvania.
                     A brief survey of the ports follows.
                     0 Toledo--The port of Toledo typically handles more coal traffic than the
             remaining four major facilities on Lake Erie.  Coal shipments in 1975 increased
             11% from 1974 to 14.6 million tons [2901. This  was a reversal of the  previous
             four-year downward trend. Four of the six coal  piers are served by the Chessie
             System while the Baltimore &amp; Ohio and Pe nn Central service the remaining piers.
<pb n="347" />

                                                     327

           The port  has.no coal storage areas employing direct-rail-to-ship transfer. The
           combined  unloading speed for the six piers is 15,900 tons per hour.
                    e Sandusky--This port is served by the Norfolk and Western Railroad.
           Its"unloading equipment can handle 3,500 tons per hour. In 1975 Sandusky shipped
           4.3 million tons of coal.     This was a slight increase over coal shipments in 1974
           but less than the tonnage   figures for the 1972 and 1973 Phipping seasons.
           Storage capacity is 910,000 tons.
                       Lorain--Lorain is the smallest   of the LakeErie   coal ports. Served by
           the Chessie System,   the port has lost,more than half its coal traffic since 1973.
           In 1975, Lorain shipped 1,264,954 tons.     The port uses very  little of the
           approximately 80 acres available for storage. It can load      coal at a speed of
           2,700 tons per hour.
                    e Asihtabula'@.-Pomparable to Sandusky in coal traffic volume, Ashtabula
           coal shipping was up approximately 400,000 tons,over 1974. Penn Central serves
           this port, which is capable of loading 8,000 tons per hour. Total coal storage
           capacity is presently 1.4 million tons.
                    0 Conneaut--Conneaut ranks second in coal tonnage shipped from Lake
           Erie ports. Between 19,74 and 1975 this port increased tonnage shipped almost 20%
           to 8.3 million tons.. Conneaut has direct rail connections with the Bessemer and
           Lake Erie Railroad. Itcan store 4 million tons and       has a loading speed of,

           10,000 tons per hour.
                    Four.million tons, or 10% of the total coal. shipments on the,Great Lakes
           in 1975 were shipped   out of the South Chicago port facility. This facility is
           the major coal,shipment area on   Lake Michigan. In 1975, 3,943,165 tons were
           shipped from this port...The facility,is,served by the Belt Railway Company of
           Chicago and is a transshipment point for    coal mined in western Kentucky, Indiana
           and southern and,central Illinois.     Coal shipments from this facility have
           steadily declined.t,o essentially half of   what they were in 1967. The port can load
           two vessels simultaneously at   a total of  5,000 tons.per  hour.
                    A new port in Superior,  Wisconsin, presently competes with.the South
           Chicago and Lake Erie ports.    Superior has become the third ma*or coal shipping

           port due to the attractiveness   of low sulfur western coal. The new Superior,
           Transshipment Terminal presently receives coal from Burlington Northern Railroad
           unit trains. The unit    trains consist of 100  cars each hauling 100 tons. Coal
           is loaded in Montana and travels 800 miles east to the Superior coal facility.
           This terminal has the capacity to transship    14 million tons annually. The
<pb n="348" />

                                                     328

              facility is designed for an eventual expansion to 20 million tons throughout. Coal
              is unloaded from the train, transported by inclined conveyor to a 1,200 foot
              long elevated truss which evenly stockpiles the coal beneath it. The storage
              area has capacity for 7 million tons. Coal is reclaimed by four rotary'plow
              feeders beneath the stockpile which feed the coal to a 96-inch conveyor capable
              of moving 11,000 tons-per hour. This conveyor feeds the shiploader, which is the
              largest in the world in terms of volume handled per'unit time [605]. In 1976
              Superior harbor will ship 2.2 million tons. By 1980 it is expected that through-
              put will increase to 8 million tons.
                      Table 61 shows the tonnage of coal shipped and received at the major Great
              Lakes ports in 1974. The ports and terminals that receive and store coal are
              typically comprised of many private facilities designed to accommodate the fuel
              needs of a specific factory or power plant. For example, the 6.5 million tons
              received in Detroit in 1974 is the combined total for 23 separate coal facilities
              reported to exist at the Detroit Harbor. Twelve are situated along the Detroit
              River; nine are located on the Rouge River and two are on the Short Cut Canal.
              The combined storage capacity of these facilities is 5 million tons [584].
                      Table 61 shows that coal received in Chicago does not arrivevia the
              Great Lakes. The waterborne movement of coal to Chicago is handled primarily by
              barge traffic up the inland waterway system connecting the Great Lakes with the
              Mississippi River Basin. There are 17 facilities that handle coal in the Port of
              Chicago.- Eleven facilities report a total storage area of 68.7 acres. The
              remaining six.facilities have a combined coal storage capacity of 2,360,000 tons
              [5831.
                      The existence of the many private coal unloading and storage facilities
              .within a port indicates that industry has found there are positive economic and

              environmental benefits to the direct C .ontrol of coal deliveries. Offsite un-
              loading and storage results in increased costs from  additional handling to
              transport the.coal to the site of consumption and added environmental impacts.
              For example, the Upper Peninsula Generating Company in Marquette had no storage
              facility at the plant site until recently. Coal was held for the company at the
              Marquette Dock Company, four miles away, and transported by rail to the power
              plant. The intermediate transportation of coal was costly and restrictive. The
              company anticipated expansion of generating capacity, so it constructed a new'coal
              facility, located approximately 600 feet from the plant to  receive coal directly
              from self-unloading vessels. The harbor has a storage capacity of 500,000 tons
<pb n="349" />

                                                   329

                                             Table 61

                        MAJOR COAL SHIPPING OR RECEIVING FORTS, 1974
                                    (Thousands of Short Tons)

                                                      Foreign                       Domestic
                                         Total Overseas Canadian         Coastwise Lakewise Internal
       U.S.. Receiving Porl@.s

         Port of Detroit                 6,571                  1                     6,570        -
         Port of Chicago                 5,024                  -                           1   5,023
         St. Clair   River, Mich.        3,046                                        3,046
         Muskegon, Mich.                 1,919                                        1,919        -
         Green Bay, Wis.                 .1,606                                       1,606        -
         Marquette, Mich.                   909                                         909,       -
         Duluth-Superior                    892                                         892        -
         Milwaukee, Wis.                    890                                         890
                 Total                  20,857      .0          1             0       15i833    5,023
             Percent of Total              100%      -          -             -         76%        24%@

       U.S. Ship2ing Ports
         Toledo, Ohio                   12,732              2,911             -       9,821        -
         Conneaut, Ohio                  6,719       -      4,699             -       2,020        -
         Port of Chicago                 4,150       2          37            -       4,113        -
         Ashtabula., Ohio                4,186       -      3,017             -       1,169        -
         Sandusky, Ohio                  4,059      60      2,257             -       1,742        -
         Lorain, Ohio                    2,015                                        2,015        -
         Duluth-Superior                    821     12          13                      796        -
                                        34,682                                T_      21,676       0
                  Total                             @_2     12,934                          0
             Percent of Total               100%    0.3       37.2                      62.5%      -

       Sources: Waterborne Commerce      of the  United States,   Part 3, Waterways &amp; Harbors,
                   Great Lakes, 1974.

        and is designed for eventual expansion to accommodate three new generating units
        in Marquette. This new development is but one of the numerous and highly site-
        specific coal unloading facilities that exist throughout the Great Lakes system.
        Greenwood's Guide to Great Lakes Shipping lists 90 such facilities.
        Storage capacity at these coal unloading docks ranges from 2.5 million to 5
        thousand tons. Most of the facilities are owned by electric utilities or steel

        and cement industries.
<pb n="350" />

                                                   330

                     A fairly recent design feature that has become commonplace among the coal
             receipt docks is coal delivery from self-unloading vessels. The development of
             the self-unloading vessel.has eliminated the need for much of the expensive
             unloading equipment-that previously dominated coal unloading sites. A self-
            @unloading vessel has hoppers with a V-shaped bottom located in the hold of the
             ship,,which allow the coal.to be dumped onto-a  conveyor belt located in a tunnel
             at the bottom of the ship. Bucket elevators then life the coal out of the hold
             to another system of conveyors which swing out from either side of the ship and
             dump the coal directly onshore. These ships can carry 35,000 tons and unload at
             a rate of 3,600 tons per hour. Once in storage the coal is then fed mechanically
             or by bulldozer.to a belt conveyor'feeding the plant [5661.

                               (b) Oil
                     Oil is another major fuel commodity transported on the lakes. In 1975,
             shipments of petroleum products totaled 11,545,789 net tons, which is approxi-
             mately equal to 86,600,000 barrels. This represents a 9% decrease from 1974 and
             a 23% decrease from shipments in 1973 [2901. The development of pi eline facili-
                                                                                 p
             ties around the lakes has accelerated the decline in transport of   petroleum
             products by lake carrier. The network of pipelines and the physical limitations
             of the Great Lakes-St. Lawrence'Seaway System have substantially restricted
             movement of crude petroleum through the ports. In 1974, less than..o'ne percent of
             the petroleum moved on the lakes was crude petroleum. Refined products,
             particularly distillate and residual fuel oil and gasoline, are the major liquid
             fuels carried by lake tankers.
                     Table 62 lists the major shipping and receiving ports for petroleum
             products. Commodities considered in developing this table were crude petroleum,
             crude tar, oil, gas products, gasoline, jet fuel, kerosene, distillate fuel oil,
             residual-fuel oil, coke, petroleum coke and liquefied gases.
                     The bulk of products refined in the U.S. destined to  be transported by
             lake vessel-originates from the Indiana Harbor area of Lake  Michigan. In 1914
             Indiana Harbor was the shipping terminal for 77.,3%-of the gasoline, 81.3% of the
             jet fuel, 70.4% of the kerosene, 70.6% of the distillate fuel and 40.0% of the
             residual fuel oil shipped on the Great Lakes [5361. This facility is served by
             one of the largest refineries on the Great Lakes, Amoco's Whiting refinery,
             which has a capacity to process 360,000 barrels of crude petroleum per day.
             There are eight major transshipment facilities located in Indiana Harbor. The
<pb n="351" />

                                                          331

             433 storage tanks in.the harbor have a combined capacity of approximately 15
             million barrels [607]. Movement of refined products on the lakes through this
             facility has remained fairly constant over the last 10 years. Crude petroleum,
             ,a minor commodity which was not handled in the harbor in 1974, is primarily
             refined in the area for shipment as a refined product. The other,major petro-
             leum shipping ports in 1974 were Chicago (10%) and Toledo (12%), which together
             with Indiana Harbor (61%) handled over 80% of the petroleum products shipped on

             the Great Lakes.

                                                    Table 62

                             MAJOR PETROLEUM SHIPPING OR RECEIVING PORTS, 1974
                                             (Thousands of Short Tons)

                                                         F o r e i g n              D o m e s t i c
                                                                       -1,qn
                                             Total     Overseas Canad'        Coastwise Lakewise Internal

             U.S. Receiving Ports

                 Port of Chicago             3,776          -          7            -       682         @,087
                 Oswego Harbor                 721          -        710            -          -           11
                 Indiana Harbor                550          -          -            -       @442          108
                 Milwaukee Harbor              534          -          6            -       522
                 Port of Detroit               314          -        210            4       100             0

                             Total           5,895                   933            4      1P746       3,212

                    Percent of Total.          100                   15.8          0.1      29.6         54.5

             U.S   Shipping Ports

                 Indiana Harbor              3,325          -                       -      3,325            -
                 Port of Chicago             1,111          -          -            -       556           555
                 Toledo Harbor                 649          -          7            -       642
                 Port of Buffalo               244          -          12           -       227
                 Port of Detroit               201                     3                    198

                             Total           5,536                     22                  4,948          560

                    Percent of Total           100                   0.5                    89-4        10.1

             Source: Waterborne Commerce       of the United States,    Part aj  Waterways &amp; Harbors,
                       Great Lakes, 1974
<pb n="352" />

                                                      332

                      The Port of Chicago is the major receiving port on the Great Lakes.
              Eighty percent of the petroleum traffic in.this port occurs-internally and
              reflects movement by barge in and ar5und the facilities on the Chicago Sanitary
              and Ship Canal and Calumet River.
                      In 1974 1.1 million tons of Canadian petroleum products were received by
              U.S. ports. Most of this was residual fuel oil (913,779 tons). Of that amount
              78% was received at Oswego, New York, and 10% was handled in Detroit.

                           (2) Capacity
                      There is a.subtle but important distinction to   be made between port
              capacity and port capability. The distinction reflects the difference between
              historic perf ormance (capability) and estimated potential performance (capacity).
              Capacity is in many respects an unrealistic term when applied to port activities.
              Though often used, the term is often misunderstood. Capacity implies an upper,
              limit to the quantity of cargo throughput and storage. The nature of port
              operation tends to preclude such absolute characterization. Port capacity is     not
              a simple function of,the loading/unloading speed. The constraints of ship
              scheduling, rail movements, traffic interruptions and delays each contribute    to a
              port's capacity to handle cargo. Additionally, the activity of a port can be
              deceptive. Ports are designed to accommodate the reasonable seasonal and inter-
              mittent peaks in demand. Therefore a certain amount of inactivity is programmed
              into the function of a port and doesn't necessarily indicate thecapacity is in
              excess of need [251]. Consequently, capacity is a constantly fluctuating value
              dependent not only on the space and equipment at the port but also on the coordi-
              nation, availability, and transshipment limitations of the various shipping and
              receiving modes of transportation. The U.S. National Academy of Science [5481

              points out:

                      It would be possible, of course, to design a port facility.so that
                      its capacity would be fully utilized at all times. Under this
                      situation, variations in demand would have to be accommodated by
                      delaying ships, forcing them to wait at anchorage until vessels
                      that arrived previously had been serviced. Also, cargo awaiting
                      ships would be delayed or would be routed through a competing port.
                      Although this approach to port operations would maximize the cargo
                      handled at a port for a given set of facilities, an economic
                      analysis incorporating both vessel cost and port facility costs
                      would show that such an extreme case of port operations would
                      represent a highly uneconomic use of resources. Conversely,
                      designing a port so that vessels are never forced to wait also
                      represents an uneconomic use of resources. As for any service
<pb n="353" />

                                                    333

                    operation, the least total cost is obtained by minimizing the
                    sum of the costs of service facility construction.and operation
                    and the costs of ship and cargo'delays. This results in a level
                    of service at which vessels are infrequently forced to wait during
                    peak periods.

                    Determination  of such an economic optimum point.requires    a
                    complex and detailed analysis of each port. While queuing theory
                    and other concepts can be employed for the study of individual
                    facilities or elements in a port, the interconnections among these
                    facilities and elements are so complex that a sophisticated time-
                    oriented sim@lation procedure may be necessary to determine fully
                    the effects of modifications in facilities or changes in operating
                    costs of physical facilities requires simulations using as. inputs
                    varying numbers of berths, entrance channel configurations, storage
                    capacities, and operating policies and procedures. Such analyses
                    to determine the economic balance for a port are,-of course, costly
                    and time consuming, especially   in the larger. and more complex ports.

                    The scope of this study precludes a detailed evaluation of the capacities
           of the Great Lakes ports insofar as those capacities are determined through        the
           realization of a complex and largely site-specific     analysis of  the economic   and
           physical parameters of the port. In recognition of the variables associated
           with port capacity, this study highlights the historic port transshipment capa-
           bility.
                    The study briefly reviews the peak bulk throughput figures     for.  the major
           fuel handling regions in the last    ten years. A   ten year time frame  was chosen
           because it was felt that a decade   would  provide  an adequate rangeof yearly cargo
           fluctuations with the least complications in equipment retirenie..nt and     facility
           modification.. This approach is felt to    offer the most reasonable measure of the
           Great Lakes ports' existing octential.forl,fuel transshipme    nt. The approach is
           conservative but appears realistic in    terms of near, future coal and oil movement

           on the lakes.

                    Coal shipments from the major   coal ports of  Lake Erie have declined 30%
           within the last decade. This decline,is marked by      an overall decrease of 13.9
           million tons since 1966. In thatyear 47.2 million       tons of  coal were shipped
           from Lake Erie ports. The year 1966    will serve as   the high  volume benchmark for
           total shipments of coal from Lake   Erie.' Over seventy percent    of this total in
           1966 originated from the   port of Toledo    This port  has witnessed a decline of
           19.1 million tons of coal shipments since    1966. Toledo   has the present capability
           to more than double its coal throughput.'    Of the four remaining major coal ports
           on Lake Erie only Lorain is regarded as presently operating considerably below
<pb n="354" />

                                                    334

              previous levels of coal throughput. This port,has had a nearly threefold decline
              in coal traffic since 1973. In that year Lorain-shipped 3.6 million tons of coal.
              In 1975 shipments had decreased to approximately 1.3 million tons. This port,
              which primarily handles coal for electric power generation, plays an increasingly
              minor role in the total Lake Erie coal traffic, contributing about four percent
              to the combined coal shipments from Lake Erie in'1975. [2901.
                      The ports of Sandusky, Ashtabula, and Conneaut are presently running
              either near or above peak levels of the last decade. Sandusky and Ashtabula
              both presently ship approximately four and one-half million tons of coal and
              are considered by their respective port officials to be operating comfortably
              within the port limitations and foresee no major expansions necessary. Conneaut
              is the only major Lake Erie port presently considering an extensive expansion of
              facilities and storage.
                      In conclusion, Toledo could presently contribute an additional 20 million
              tons of coal traffic to the system. Revitalization of smaller facilities such as
              Lorain with additional growth in throughput from Sandusky, Ashtabula and Conneaut
              could add substantially to this figure. Thus, in general terms, the ports of
              Lake Erie are capable of nearly doubling present coal throughput. It should be
              reemphasized however that such expansion is contingent upon the complex optimi-
              zation of diverse activities such as coordinating rail-to-ship transfer and,
              most importantly, upon a return to the high demand for coal originating in the,
              Appalachian fields.

                      Shipments of coal from the South Chic ago facility have demonstrated a
              decline similar in magnitude to the.Toledo facility. In 1975 this facility
              handled less than half the coal it shipped in 1967. Resumption of coal trans-
              shipment to 1967 levels would result in an additional four million tons of Great
              Lakes coal traffic. Like Toledo, this area has historically transshipped coal
              of a relatively high@sulfur content. The future revitalization of this port is
              highly contingent upon the quality of coal originating from this port to the

              lakes.

                      The new coal shipping facility at Superior, Wisconsin has been in opera-
              tion only one year, so it is unreasonable to equate historic capability with the
              ,capacity limitations of the facility. This coal transshipment facility handles
              low sulfur western coal from Montana.   Reported to be the largest bulk handling
              facility in terms of cargo handled per  unit time, the Superior facility is
              designed for an eventual transshipment  capacity of 20 million tons per year.
<pb n="355" />

                                                335

         This facility, in addition to expanded shipments through South Chicago and
         Toledo, could essentially double the coal traffic tonnage moved on,the Great

         Lakes in 1975..

                 The capabilities  of the.system for coal movement on the lakes is
         presently not in excess  of need. This assumption is based on a nonspecific.
         demand for coal quality  and may vary considerably according to fuel quality. An
         analysis of the factors  affecting this demand is presented in the section on

         regional scenarios.
                 The capacity of.facilities 'Shipping oil on the Great Lakes,i,s of lesser
         concern in relation to a fuel supply for electric power generation in. the region.
         The development of extensive oil movement by pipeline, combined with a negligible
         future development of refinery capacity in the area, indicates at best a very
         conservative rate of growth in shipping of petroleum products. Indiana Harbor,
         the primary location of petroleum movement on the Great Lakes, reports operation
         well within historic capabilities and anticipates no major-expansions.

                      (3) Demand
                 The pressures placed on the capabilities of ports and terminals.is a
         function of the demand for fuels to be transported by lake vessel. The demand
         for coal on the Great Lakes is largely generated by utilities, coke and  gas
         companies, and retail dealers. Coal.for utility consumption accounted for 51%
         of the coal traffic on the lakes in 1975. Coke and gas facilities acquired 34%,
         while 15% of the U.S. coal transshipped through U.S. and Canadian ports was
         received by retail dealers and.other users. Of.the Great Lakes states only
         Michigan, New York, Ohio and Wisconsin.were reported to receive bituminous or
         lignite coal via the GreatLakes in 1975 [604.]. Nearly 47% of the present
         market for U.S. coal transported on the Great Lakes is located in Canada [6041.
                 A number of projections havebeen developed forecasting thefuture demand
         for Great Lakes coal traffic. These projections as analyzed in the Great,Lakes
         Transportation System [1471 predict either growth or stabilization to occur on
         the Great Lakes over the next 40 years.
                 The U.S. Army Corps of Engineers in 1961 projected coal movements on the
         Great Lakes to increase steadily from 93.4 million tons in 19751to 148.5 million
         tons in 2015. These projections were based on a study of the major consumers of
         coal: electric utilities, steel plants and cement plants.
<pb n="356" />

                                                    336

                      The projections by the Bureau of Mines (1970) assumed a growth rate of
              Great Lakes coal traffic of 3.1% per year, commensurate with the national energy
              needs through 1980. Increased development of nuclear power was assumed to reduce
              this growth rate to 2.5% per year after 1980. This projection predicted that
              73 million tons of coal would be shipped on the Great Lakes in 1995.
                      The International Great Lakes Levels Board (IGLLB) extended the Bureau of

              Mines forecast beyond 1995, projecting stabilization of coal shipments at 74
              million tons through the year 2020. This projection was balanced by their high
              and low forecasts for Great Lakes coal shipping. The high forecast predicted an
              increase of 73 million tons between 1970 and 1995. Beyond 1995 shipping levels
              would stabilize at 134 million tons per year through 2020. The low projection
              assumed a 1.25 percent growth rate until 1995 then.leveled off.at 43 million tons
              through 2020. In either case the projections assume d the same ratio of-coal
              production to shipping as postulated by the Bureau of Mines.
                      A recent projection of coal shipments for the Great Lakes Region,
              published by A. T. Kearney Inc. in,1976 for the U.S. Army Corps of Engineers
              [2431, seems the most likely of the trend projections (Table 63). The Kearney
              study took a conservative approach in forecasting potential.western coal move-
              ment on the Great Lakes and St. Lawrence Seaway (GL/$LS). Only the movements
              currently planned were included in the forecast potential. Additionally the
              study operated under the assu@nptio.ns that:
                      *  Few, if any, existing facilities would be converted to western'
                         coal due to high conversion costs.

                      e  Only new facilities that have announced plans for use of
                         western coal would be included in the forecast.

                      9  Stack gas scrubbers would be economically efficient and
                         available by 1990.

                      9  Current emission standards will remain unchanged throughout
                         the forecast period.

                      o  Variances to burn high,sulfur coal will be extended until
                         stack gas scrubbing technology becomes available.

                      o  Canada will adopt emission standards that will not preclude
                         usage of U.S. eastern coals.

                      o  The development of nuclear power generation facilities will
                         be delayed and retarded by environmental, safety and economic
                         factors.
<pb n="357" />

                                                   337

                   9 Environmental concerns regarding strip mining will not
                      restrict the growth of coal mine development in the West.

                   The Kearney projection of a 2% average annual increase shows coal move-
          ment tripling by the year 2040. As the Kearney report points out, U.S. movements
          assume the largest share of the total growth at 2.1% per year, while,Canada
          initiates domestic movements and shows movement of 12.6 million tons by 2040.
          This traffic is expected as a result of Canadian western coal movement to the
          Lake Ontario facilities of Ontario Hydro.

                                             TABLE 63

                                 Potential GL/SLS Coal Movements
                                          (Mi I I ion@i-of_T_o_ns)

                             United States         Canada      United States
                                Domestic         Domestic         to Canada         Total

              1972  Base           44.1              0              17.8              61.9
              1980                 58.3              5.0            22.7              86.0
              i990                 77.7              6.4            26.8            1.10.§
                                   94.7              8.0            30.4            1-33.1
              2010                114.9             10.1            34.3            15-9.3
              2020                134.0             11.0            36.5            181.5
              2030                156.7             11.7            38.7            207.1
              2040                184.2             12.6            41.0            237.8

              Source: A. T. Kearney, Inc.

                   Table 64 and Figure 36, adapted from Schenker [147] and with the addi-
          tion of the Kearney projection, illustrate the variations among the previously
          described demand projections of Great Lakes coal movement.
                   The demand for U.S. shipments of liquid fuels on th6'treat Lakes was, in
          a projection by Schenker [147], determined to have difficulty competing with
          pipeline transportation. Pipelines, as a long-term capital investment, maintain
          a high rate of utilization once constructed. Therefore the continued development
          of the pipeline network throughout the region was assumed to have a substantial
          negative impact on the future demand for Great Lakes shipping of liquid fuels.
          Rail movement, though usually more costly than waterborne movement, is important
          to high volume consumers such as electric utilities, because of its reliability.
<pb n="358" />

                                                                     338

                                                                TABLE 64

                                             PROJECTIONS OF U.S. GREAT LAKES SHIPMENTS OF COAL

                                                           (Millions of Short Tons)

                                       1970     1975      1980   1985     1990     1995    2000     2005     2010    2015     2020

            Corps of Engineers (1)     83.5     .93.4     106.7  114.6    124.9    130.3   135.0    139.6    143.2   148.5
            (1961)

            Bureau of mines       (2)  53.0     5@.O      62.0    66.0     69.0     73.0
            (19,70)

            IGLLB  -High          (3)  61.0               83.0                     134.0   134.0                              134.0
            (1973)

                   -Medium        (4)  53.0               62.0                      74.0     74.0                              74.0

                   -Low           (5). 44.0               43.0                      43.0     43.0                              43.0
            Kearney (1976)                               81.0           104.5              105.1           149.2"           170.5

                    NOTE: The Kearney projections are            for domestic traffic only
                    SOURCE: [1471

                                                                    FIGURt 36
                                      S@ort Tons
                                 300   (Millions)
                                                                  PROJECTIONS OF
                                                       U. S. GREAT LAKES COAL SHIPMENTS
                                                              (MILLIONS OF SHORT TONS)

                                200

                                                                                                                  3

                                100-

                                                                                                                   4
                                                                              2

                                                                                                                   5

                                  0                       L
                                         1970           1980           1990        2000           2010          2020

                                                                          Year
<pb n="359" />

                                                       339

                     The problems of storing large supplies of liq@uid fuels combined with the
            seasonal nature of lake traffic encourages use of pipelines and rail transporta-
            tion instead of waterborne movement. Schenker [147],, in considering expansion
            of pipeline traffic and conservation efforts, suggests'the projection giving
            slightly more weight to the immediate past is most accurate.

                                                     TABLE

                                       TREND PROJtCTIONS,OF GREAT LAKES
                                      AND ST. LAWRENCE SEAWAY SgIPMENTS OF
                                 CRUDE PETROLEUM AND SELECTED PETROLEUM PRODUCTS
                                                       1975-1985

                                             (Millions of Short Tons)

                                                            1975           1980            1985

                      Great Lakes

                      unweighted trend:                     14.6           15.0            15.5

                      Weight of immediate past:

                              Slightly Stronger:            13.8           14.1            14.3

                                           Strong:          13.61          13.7            13.9

                                    Very Strong:            13.7           14.0            14.3

                      St. Lawrence  Seaway

                      Unweighted trend:                      4.5            5.4             6.14

                      Weight of immediate    past:

                              Slightly Stronger:             3.9            4.3             4.7

                                           Strong:           4.5            5.3             6.2

                                    Very St  rong:           4.6            5.5.            6.4

                               Source [1471
<pb n="360" />

                                                                               340

                                       (4) Origins and Destinations 'of Fuels Handled
                                 An important adjunct to the increased demand for fuels, particularly coal,
                    is the effect such demand will hav@ on the pattern of waterborne traffic around
                    the lakes. Competition between the various modes of transport, water, rail,
                    pipeline, etc., insures a constant flux in the patterns of movement between
                    origins and destinations.
                                 Historically, the bulk of coal movement on the Great Lakes has originated
                    from the ports on Lake Erie. Located in                        proximity to the major Appalachian coal
                    fields these ports developed as transit points for coal and iron ore movement in
                    the region. Table 66 illustrates the destinations on a regional basis for coal
                    moving through Toledo, Sandusky, Lorain, Ashtabula and Conneaut.

                                                                           TABLE 66

                              w,rUMINOUS COAL. SHIPMENTS TO UNITED STATES PORTS FROM LAKE ERIE

                   To U.S.                 To Lake             To              To          To Lake        To Lower             To
                                           Superior          Sault       Lake Huron        Michigan         Rivers       Lake Erie          Total
                   Toledo.                 1,370,004           44,442.       301,878       1,427,757       7,254,639        823,954       11,222,674
                   Sandusky                  725,539           40,590        100,090           45,857        511,177          78,742
                   Lorain                      -               ...           161,507            ---          887,688        '215,759       1,264,954
                   Ashtabula                 234,241           ---           192,244          267,976          37,494          ---            731,955
                   Conneaut                  616,644           18,965        109,965          613,214        155,357           ---         1,514,345

                   Total 1975              2,946,428         103,997         865,693       2,354,804       8,846,555      1,118,455       16,235,932
                   Percent 11975                 8.88              .31            4.06           7.10           26.67           3.37            48.94
                   Total 1974              2,521,287         232,090        1,210,502      2,568,195       9,576,23T        725,396       16,833,707
                   Percent 1974                  8.46              .78            4.06           8.62           32.14           2.43            56.49

                                                                                                                            Thru
                   To Canada               To Lake             To              To          To Lower           To          Welland
                                           Superior          Sault       Lake Huron         Rivers        Lake Erie         Canal           Total
                   Toledo                      25,710       1,992,674          41,843          19,135         .32,839     1,319,745        3,431,946
                   Sandusky                    ...             ---             ---              ---            51,005     2,785,050        2,836,055
                   Lorain                      -               ---             ...                                             ---             ---
                   Ashtabula                   78,449          ...             ---            943,606        943,737      1,887,061        3,852,853
                   Conneaut                    ---             ---             ---         1,937,872       2,781,988      2,098,794        6,818,654

                   Total 1975                104,159        1,992,674          41,843      2,900,613       3,809,569      8,090,650       16,939,508
                   Percent 1975                    .31           6.01             .13            8.74           11.48           24.39           51.06
                   TotaI1974                 229,145        1,791,127          48,269      3,151,810       1,487,482      .6,259,219      12,967,052
                   Percent 1974                    .77           6.01             .16           10.58            4.99           21.00           43.51

                      SOURCE: Lake Carriers Association.                       Annual Report:          Lake Carrier's Association. 1975.
<pb n="361" />

                                                 341

                  The table shows that over half of the coal shipped from these ports is
         destined for Canada. This trend is most pronounced at the ports of Conneaut and
         Ashtabula, which ship 82 and 84%, respectively, of their     coal to Canadian markets.
         The cross-lake traffic in coal to Canada primarily supplies steel mills and the
         power facilities of Ontario Hydro. Traffic to.utilities      and the steel industry
         accounted for 95% of the U.S. coal movement on    the Great  Lakes to Canada [6041.

                  The domestic movement of coal from the   Lake Erie  ports is dominated by
         the Port of Toledo. Seventy percent of the Great Lakes     coal movement to United
         States ports originated from this po  rt. Of this traffic    over 60% was destined
         for the steel mills and utilities of southeastern Michigan. The future of this

         short haul movement from Toledo to the Detroit area is uncertain.      Unit train
         movements froff mine directly to the consumer and downbound traffic    of western
         coal from Lake Superior are satisfying a greater percentage of the      electrical
         fuel demands of this region.
                  Movement-of coal to Lake Superior from the port of Lake Erie remains a
         major traffic movement. Nearly 50% of the domestic shipments from Sandusky are
         destined for ports on  Lake, Superior. The electric power facilities at Marquette
         account for the majority of this traffic. While Sandusky supplies coal for Lake
         Superior ports, over 60% of all coal shipped on the Great Lakes from this port
         goes to Canada. Lorain, the only major coal handling port on Lake Erie,not to
         export to Canada, shipped primarily to the electric power facilities of the
         Detroit Edison Company. Regulations on the sulfur content in coal and competition

         from rail traffic have been instrumental in the decline of Lorain as a major coal
         facility.
                  The facility at South Chicago on Lake Michigan was the point of origin,
         for approximately four million tons of coal shipped on the Great Lakes. Coal
         from this port was destined primarily for the Consumers Power.units of western
         Michigan and the facilities of the Wisconsin Electric Power Company. Coal traffic
         from South Chicago has declined by about one-half over the last decade; largely
         because of sulfur regulations.,
                  The new transshipment facility at Superior, Wisconsin, was designed to
         benefit  from the regulations on coal quality that have plagued   many of the other
         transshipment facilities. Handling low sulfur coal from western states, Superior
         i.s the origin for low-sulfur coal-shipped to the electric power facilities of
         Detroit Edison. Presently serving only Detroit Edison, extensive expansion to
         other markets is anticipated. The Superior facility is designed for an eventual.
         capacity of 20 million tons throughput.
<pb n="362" />

                          Electric utilities provide the major demand for coal shipped on the
                 lakes. In 1975 48% of the coal.,-shipped,on the Great Lakes was destined for use

                 by utilities. Coke and gas plants consumed 28%, while retail dealers and others
                 consumed the remaining 24% [6041. These destinations were located almost
                 exclusively in either Michigan or Wisconsin. These states purchased 96% of all
                 domestic coal transported by lake for utilities, and Michigan alone was the
                 destination for 91% of the waterborne coal used by coke and gas plants.
                          Petroleum shipments on the lakes originated primarily from the ports of'
                 Indiana  and Chicago on Lake Michigan's southern shore. These ports accounted
                 for-more than 70% of the petroleum products shipped on the Great Lakes.
                          The destination points for lakewise movements of these fuels are
                 scattered throughout the region with virtually every major port receiving and
                 storing liquid fuels. The widespread distribution of receiving terminals through-
                 out the region reflects the flexibility shipping offers over,pi   pelines in smaller
                 scale delivery of this fuel.

                             (5) Planned   or Scheduled.Facilities
                          Port expansion or new port,construction is often the direct-consequence
                 of the development of additional energy facilities. Such port development is
                 particularly applicable to the construction of coastal dependent coal-fired'
                 electric generating facilities, which historically have relied on waterborne fuel
                 delivery.
                          U.S. Great Lakes coal traffic originates from three major districts: Lake
                 Erie, South Chicago and Superior, Wisconsin. In 1975, the Lake Erie ports of
                 Toledo, Ashtabula, Conneaut, Lorain and Sandusky shipped 33.2 million tons of
                 coal, or 85% of the coal traffic on the lakes. Within the last,ten years coal
                 shipments from these ports have declined 28%. a decrease of 12.7 million tons
                 since 1965. Consequently, most of the ports in this region operate at.levels
                 well below their prev ious, capabilities. The only major Lake Erie coal harbor
                 presently contemplating extensive expansion is Conneaut. Conneaut, presently
                 storing four million tons and shipping approximately eight million tons, antici-
                 pates a substantial increase in coal traffic.
                          The proposed expansion will provide  Isubstantially more storage space and
                 will include a conveyor belt system, travelling stacker, and bucket wheel
                 reclaimer. Much of the expansion is projected for Canadian use, particularly by
                 the Ontario Hydro utility facilities. Eighty percent of all coal shipments from
<pb n="363" />

                                               343

         Conneaut ar6 presently destined for Canada. The expansion may double storage
         capacity to 8 million and increase throughput to 13 million tons. Barring
         delays in permit approval and construction, expansion completion is set for the
         spring of 1978.. The ports of Sandusky, Toledo, Ashtabula and Lorain anticipate
         no near term major expansions. Officials at these ports feel the facilities can
         accommodate the expected increases in coal traffic.
                 The South Chicago harbor on Lake Michigan shipped eight million.tons of
         coal in 1967. In 1975 this facility found market for about four million tons of
         coal. There are no plans to expand. Much of the coal moving through this port
         originates from the midwestern coal fields in Illinois. The high sulfur content
         of this coal has accelerated the-decline in volume transshipped from this port.
         A minor quantity of western coal'has moved through the Chicago port and-could
         contribute to future- redevelopment of capacity capabilities.
                 The third major coal shipping region is located in Superior, Wisconsin.
         This single facility completed in 1976 will have an eventual capacity to trans-
         ship,20 million tons. Coal shipments have risen sharply in Lake Superior. In
         1973, 130,592 tons of coal were shipped from Lake Superior ports. Completion of
         the facility in-Superior, Wisconsin-in 1976 will add 2.2 million
         tons to the'total coal.shipments from Lake Superior ports. The facility was
         developed in response to-the demand from the Detroit Edison Company for low
         sulfur coal. This utility contracted for 180 million tons of low sulfur western

         coal from the Decker mine in Montana. This contract for western coal extends
         over a 26-year period and was projected for use by Edisonis St. Clair and Belle
         River power plants. However, construction plans for the Belle River plant have
         b.een delayed due to financial difficulties,'and Detroit Edison is in the process
         of analyzing alternatives for the consumption of coal originally designated for

         Belle River.
                 A development similar:to the Superior facility is being@constructed at
         Thunder Bay, Ontario, on Lake Superior. Low sulfur coal'originating from mines
         in'Alberta, Saskatchewan and British Columbia will be delivered by Canadian
         National and Canadian Pacific unit trains. Scheduled to begin operation at the
         start of the 1977 shipping season, this facility is expected to initially ship
         3 million tons of coal per year. These shipments are destined for Canadian
         markets in Ontario and eastern Canada and may compete with future coal shipments
         originating from the U.S. ports on southern Lake.Erie [147].
<pb n="364" />

                                                      344

                        A major expansion in demand for coal receipts from Superior, Wisconsin,
                may occur near Buffalo. The Niagara-Mohawk Power Corporation is planning two
                850 MW coal-fired.plants near Dunkirk, New York, on Lake Erie for 1985 and
                1987. Low sulfur western coal is anticipated for use as the fuel source.
                Operation of the two Lake Erie power plants will require approximately six million

                tons per year.
                        Niagara-Mohawk was faced with two major optioas for transshipment of their
                western coal to the plants at Dunkirk. They could either have coal delivered to
                Buffalo and then transport it by unit train or barge approximately 50 miles to
                Dunkirk, or develop a separate transshipment facility at Dunkirk. Were coal
                delivered directly to Buffalo high costs would be incurred both in the develop-
                ment of a large coal facility at the port and in transportation rates by short
                haul unit, train or barge to Dunkirk. Development of a new deepwater harbor at
                Dunkirk also Appeared prohibitive in that the lake bottom in that area is
                essentially bedrock.
                        The utility is present ly developing plans for an offshore unloading
                facility at a site'in Lake Erie approximately eight miles west of Dunkirk Harbor.
                This structure would consist of a number of concrete bresting and mooring
                dolphins, one of which is designed with an open shaft to accept coal from the
                self-unloading coal vessels. The coal will drop down the shaft to a conveyor
                tunnel approximately 23 feet in diameter running beneath the lake bottom. The
                tunnel would emerge onshore for reclamation.and distribution by conveyor to the
                plant. 'The tunnel will also house a water pipeline to supply makeup water for
                the plant. Total cost for the unloading facility and tunnel conveyor is
                estimated at about $60 million.
                        Such a facility represents a unique approach to traditional coal trans-
                shipment design. Projecting the development offuture facilities of this kind
                at other Great Lakes sites is difficult as this facility may be the direct result
                of the geological characteristics that hamper economical dredging activity at
                Dunkirk. The Dunkirk plans represent a major addition in coal transshipment
                facilities for power production in the Great Lakes thr ough 1985. Table 67
                outlines the expected fuel origin, type, and method of movement for scheduled,
                fossil-fuel power facilities greater than 300 MWe in the Great Lakes coastal
                counties through 1985.
<pb n="365" />

                                                       345

                                                      TABLE 67

                           FUEL TYPE, ORIGIN AND TRANSPORTATION FOR FOSSIL-FUEL
                                        FACILITIES SCHEDULED THROUGH 1985

                                                                                           LIKELY
                                                                                             FUEL
                                            GENERAL                                       TRANSPORT
              PLANT NAME      UTILITY       LOCATION      FUEL  TYPE     FUEL ORIGIN         METHOD

              Edgewater       Wisconsin     Sheboygan,       Coal           Western       Unit Train
                              Power &amp;       WI                              fields
                              Light

              Prairie View    Wisconsin     Kenosha,         Coal           Western       Unit Train
                              Power &amp;       WI                              fields
                              Light
              Campbell 3      Consumers     Holland,         Coal           Eastern       Unit Train
                              Power         MI                              fields
              Karn 4          Consumers     Bay City,,       Oil            Sarnia,       Train-Sarnia
                              Power         MI                           Canada and       Pipeline -
                                                                         Lakehead           Superior,WI
                                                                         pipeline
              Belle River     Detroit       St.Clair,.       Coal           Western       Lake Vessel
                              Edison        MI,                             fields

              Greenwood       Detroit       Port Huron,      Oil            Sarnia,       Barge to
                              Edison        Mi                              Ontario       Pipeline
              Dunkirk         Niagara-      Dunkirk,         Coal           Western       Lake Vessel
                              Mohawk        NY                              fields
              Oswego #6       Niagara-      Oswego,          Oil            South         Ocean Tanker
                              Mohawk'       NY                              America       to Barge

                    The information in Table 67 was gathered from.each utility           and is
           presented as their current estimate for fuel supply.' Certain entries are, of
           course,  more definite than others. The Edgewater and Prairie View           plants in
           Wisconsin each anticipate utilization of western coal., Their geographic loca-
           tions allow fairly direct access from eastbound unit trains. -The Edgewater site
           could conceivably receive coal by lake carrier through Sheboygan, but the
           officials at Wisconsin Power and'Light presently favor direct unit train'
           transportation. The Consumers Power Company is investigating use of low sulfur
           eastern coal delivered by unit trains for their Campbell #3 unit on Lake Michigan.
           This utility anticipates that the low sulfur eastern coal will have better heat
           value, be a more reliable supply, and have lower transportation costs than
           western -coal.
<pb n="366" />

                                                       346

                        Three of the eight new facilities listed in Table 67 are designed to
               burn oil for power production. Both the Karn and Greenwood units are to receive
               their -oil fuel supply from Sarnia, Ontario. Each utility assumes a different
               approach to the transportation of this fuel. Detroit Edison's Greenwood
               facility plans to transship fuel oil by barge from Sarnia across the St. Clair
               River. Once across the river the oil would then be pumped into a pipelinethat
               runs approximately 15.miles inland to the Greenwood plant.
                        The Karn unit near Bay City also plans to receive   oil from Sarnia.
               However, they intend.to receive fuel delivered by train.     Additional oil from the
               Lakehead pipeline will supplement the fuel deliveries from Sarnia. Karn units
             .#3 and #4 combined will consume approximately 30,000 barrels per day. Seventy-
               five percent of the fuel supply to these units will be delivered by-train while
               the balance will be  supplied by pipeline.
                        It is expected that fuel for the Oswego #6 unit,will be delivered by the
               same barge system that presently serves the existing Oswego oil-fired units. @o
               major expansions are planned for-fuel transshipment. Presently oil from South
               America moves by tanker to refineries in the Caribbean. The refined product is
               shipped northward into the St. Lawrence Seaway for delivery to storage facilities
               in Montreal. Oil is transferred to barges in Montreal for delivery in Oswego.

                        C. Refineries

                        The total refinery capacity in the eight Great Lakes states is 3,513,380
               barrels of crude per day .(calendar day figures are refiners' averages for the
               number.of barrels per day a refinery yields on the average). Of this refining
               capacity 1,045,185 bbl/day or 30% is located in the coastal zone. All eight
               states have some refining capacity, with Minnesota,.Pennsylvania and Illinois
               having no capacity,1ocated within their coastal zone      With respect to the
              ,relative numbers of barrels refined within each state the breakdown is shown in
               Table 68.

                        Current refinery construction in the Great Lakes states is presently
               restricted to expansion of existing facilities. These expansions amount to only
               95,440. bbl/day (includes coking operations) of which only 2,400 bbl (Sun Oil Co.,
               Toledo, Ohio) are in the coastal zone area.

                 from Oil and Gas Journal, April, 1976.
<pb n="367" />

                                                347

                                              TABLE 68
                        BARRELS OF CRUDE OIL REFINED IN EACH,GREAT LAKES STATE

                                          Total                Total
                                    bbl/day Capacity    bbl/day Capacity     Percent In
                                          (State)         .(Coastal Zone)- Coastal Zone

          Niew York'                    111,385                111,385           1-00%
          Pennsylvania                  757,020                                    0
          Indiana                       561,160               436,000            87%
            li-nois                   .1,176,800                 01                0
          M'f -_ h ian                  147,200                65,000            44%
          Minnesota                     216,800                  0                 0
          Wi 0                          589,770               337,400            57%
          Wisconsin                       45,400               45,400

          Great Lakes Total            3,513,380            1,045,185            30

          U.S. Total                  15,074,845 bbl/day

          Gre.-_ "Lakes total
               ,,.of U.S. Total           23%
          Grer@t Lakes Coastal
            4o-e as % of U.S.               7%

            t .0
                               Source: Oil and.Gas Journal, April, 1976

                 Texacols Lockport, Illinois, plant has announced a planned expansion of
         input capacity of 25 x 103 bbl/day with an uncertain operational start date.

         The Cirillo Brothers of Albany, New York have announced a new refinery of
         20,000 bbl/day input capacity of uncertain operatlonal date and product output.
         The largest new facility to be announced in the coastal zone is New England
         Petroleum's Oswego, New York, refinery of an expected 200,000 bbl/day input
         capacity. Again, no operational date or product output ahs,been announced for
         this proposed plant.
                 High costs of-refinery construction combined with uncertainty about
         long-range government energy policy has led to the smallest increase in U.S.
         refinery capacity (1975 - 146,000 bbl/day) since 1965. Further, this increase
         was approximately 240,000 bbl/day less than had been forecast. Nationwide, the
<pb n="368" />

                                                        348

                expansion of existing facilities accounted for most of the U.S. increase in
                refinery capacity.
                         Each refinery is a speciall"j designed unit with the specifications and
                requirements of the facility being very dependent upon the type of crude and the
                products to be refined. Therefore, generalizations about refineries are often
                inaccurate outside the context of site, product and process specificity. Allow-
                ing for such, the following "rule-of-thumb" guidelines for refineries have been
                suggested.
                         There are three main determinants of refinery siting: (1) proximity to
                major product market area, (2) relative proximity to sources of crude, and
                (3) availability and costs of various modes of transport. This last is a major
                reason fo@ refineries' preference for   .coastal siting.
                         Between 200 and 1,000 acres are needed for 100,000 bbl/day refinery
                complexes, with the lower limit representing a simple fuels refinery with a
                40-day storage',capacity and the upper.limit a complex fuels-petrochemical refinery
                with a 120-day storage capacity. This large difference in land requirements
                (with land generally being 5-10% of total refinery cost) represents the large.
                variations in the, complexity of refineries as well as the' different storage
                capacity requirements at specifid-refineries. Almost     all refineries have
                minimum storage facilities sufficient for a 30-day supply of crude oil plus
                additional capacity for mixing and storage of refine   d products I(i.e., heating oil
                in summer or gasoline if delivery of crude is erratic). Refineries which are tanker-
                fed (neces,sarily coastal dependent) requi re more storage area due to the non-
                continuous nature of the tanker delivery system. This last factor tends to be
                of smaller concern to Great Lakes refineries as they are predominantly pipeline

                supplied.
                         A 200,000 bbl/day refinery capacity is considered an optimal size. Such
                a size is  needed to introduce the  economies of scale neces sary  to offset high
                construction costs of new facilities so that they can be competitive with old
                plants. These sizes are also necessary to keep operating costs to a minimum.
                A few years ago, a rule-of-thumb cost for refineries ran approximately
                $1500/bbl/day capacity. Now a more realistic figure would be $3,500 to $4,000/
                bbl/day capacity, with some plants going as high as $6,500 to 7,000/bbl/day
                capacity.

                  Communication, National Petroleum Refiners' Association.
<pb n="369" />

                                                  349

                   For the past few years9 the national trend has been to build new

          refineries outside the continental U.S., particularly in the Caribbean, to take
          advantage  of lower total taxes,  less strict environmental controls . deepwater
          ports and  competitive transport  costs. However, this trend is being reversed
          (balanced  expansion) somewhat by high tarkifs on imported refined products and
          low domestic &amp;rude prices, along with considerations for national     defense policy.
          The probable increase of national refining capacity    coupled with   refineries'
          desire for close proximity to transport facilities and areas of demand may
          indicate a renewed interest in the Great Lakes coastal zone for     siting refinery

          complexes.
                   The two major obstacles to new refinery development are high construction
          costs and environmental considerations. Of the latter, by far the greatest
          concern to refineries is, oxidant level requirements set by the    Environmental
          Protection Agency. According to the refining industry, the low levels.allowed
          by EPA virtually preclude new refinery construction in already developed areas,
          precisely where the refining industry wants to be. The major source of this
          problem is.the emission of hydrocarbons (a 100,000 bbl/day refinery with 30-day
          capacity may emit as much as 10,000 lbs/day, even with advanced 'containment
          technologies), with most hydrocarbons released during storage and tank filling.'
          Other pollutants associated with petroleum refining are particulates, sulfur
          oxides, aldehydes, ammon ia, and hydrogen sulfide. Water use is being minimized
          (H20/bbl capacity) by using water recirculating cooling systems. New refinery
          construction is-depending more on air cooling, resulting in    a lessened dependency
          on large water  resources. Further, better water treatment    is being utilized,
          which further reduces water consumption (by increasing usable life span of water)

          and thus the coastal dependency of facilities.

                   New refineries are most dependent on environmental and economic consider-
          ations, many of which are not easily controllable by the individual states. With
          the problems of capital formation and air/environmental quality requirements, the
          development of refineries in the Great Lakes Region would seem slim. A further
          factor which dictates against Great L  akes Region siting of refineries is the
          relatively lower cost of refining mideastern and   most domestic crude oil in the

            Communication, National Petroleum Refiners' Association.
<pb n="370" />

                                                    350

              Gulf Coast states [3701. Refinery economics are 'Such that in most instances, it
              is less expensive to pipe refined products to the Groat Lakes Region, than it is
              to refine the crude locally. These three major factors would seem to dictate
              against any large expansion of refinery capacity.
                      One factor which might influence further refinery development-in the
              Great Lakes Region would be the piping'of Alaskan crude through the region.
              proposed Trans-Provincial or Northern Tier pipelines could potentially bring
              between 700,000 to' 1,000,000 bbl of oil daily'into Minnesota. Such a development
              might necessitate the building of two'or three'new refineries, but would not
              significantly influence the coastal zone.

                  4. PLANNED OR SCHEDULED FACILITIES FOR ELECTRICAL GENERATION

                      a. Types and Location by State and Region
                      Future electric power generation in the eight Great-Lakes states will be
              very dependent upon coastal zone facilities. Of the eight Great Lakes states,
              Illinois, Minnesota and Pen nsylVania currently have no confirmed plans through
              1985 for new generating capacity within their coastal zones. A single 800 MW
              coal-fired plant has been discussed for the Pennsylvania.coastal zone around 1990,
              with the utility's land holdings at the projected site being sufficient for an
              additional unit. The western portion of Erie County, Pennsylvania, iis largely
              undeveloped, with a large percentage of'the land held by Penn Electric, United
              States Steel, and the Boy Scouts. Hence, the potential for facility development
              in Pennsylvania still exists.
                      Illinois also has a relatively small coastal zonei- but one of the
              most highly developed in the Great Lakes states. The potential for future expan-
              sibn is seen to be limited due to the difficulty of obtaining sufficient acreage
              for energy facility development (5681. The pressures on the coastal zone area
              for uses other than energy facility siting.are such that no major facilities are
              currently being considered. Access to the coastal zone water resources and fuel
              transshipment facilities for inland generating sites will most probably comprise
              the major use of the Illinois coastal counties for electric generation purposes.
              The utilities within the State of Illinois have currently planned eight coal-
              fired facilities, five oil-fired and eight nucl:ear-powered generating units,
              totaling 11,370 MWby 1984. This schedule reflects Illinois' continuing develop-
              ment of a high nuclear generating capability.
<pb n="371" />

                                                  351

                  The Minnesota utilities currently have no announced plans for generating
          'facilities in their'coastal counties.. With respect to.1uture development the
          Minnesota Energy Agency,suggests*that: "Water availability, population density
          and location to relative load centers would all seem to@@point toward increasing
          pressure on!,the coastal zone area especially if demand grows as rapidly as the
          utilities project."    Statewide, Minnesota currently has five coal-fired
          generating facilities scheduled to come on line by 1984. 'No oil or nuclear

          facilities have been announced for'the state. The curtailment of Canadian oil

          will proba bly further the,development.of coal-fired facilities., One event which
          may alter Minnesota@'s energy future is the transporting of Alaskan crude oil
          through the state via the proposed Northern Tier pipeline or the Trans-Provincial
          pipeline. Such a circumstance might alter the future fuel mix for electric power
          generation or reduce the substitution of electricity    for other energy sources,
          thus reducing projected demand for electric   power.
                  Indiana currently has one schedLled   facility in its coastal tone, the
          645 MW Bailly nuclear facility, the coastal    zone of Indiana is fairly.industrial-
          ized, with 22 miles ofthe 45 mile coastal zone    industrially developed and 17
          miles devoted to, public' recreation lands [436].  Future development in this area
          may.be restricted by air or water quality regulations. As with Illinois, Indiana
          may only be able to utilize the,waters of the coastal zone for inland energy.,
          facility sites. The Indiana utilities have currently planned 10 coal-fired and
          3 nuclear powered generating fac.ilities,,totaling  9,220 MW by 1984 (this   includes
          the one coastal zone.facility).
                  Wisconsin has seven coal-fired facilities scheduled, three of which will

          be in the coastal counties.   With 140 miles of their 619 mile coastal zone
          currently agricultural or  undeveloped, the potential for new   generating,facilities
          in the coastal zone is large  [436].  The two Koshkonong nuclear 900 MWunits
          scheduled.for 1983 and-1984  have been deferred until 198.6.. Similarly, the Tyrone
          nuclear station has been deferred indefinitely. The-coastal zone resources of
          Wisconsin, as in many states, will be in greater.demand in the future due to
          limited availability of inlandwater in quantities.suffi.cient for a modern
          generating station. The Pleasant Prairie plant is an,example, of a station that.
          will site near existing transmission and fuel transportation systems but close.
          enough to the coastal zone for economical utilization   of lake  water. For many

           Communication from R. D. Visness, Minnesota Energy Agency.
<pb n="372" />

                                                    352

              future facility sitings the access to coastal zone water resources will be of
              high importance. The availability of western coal combined with the deferment
              of nuclear facilities will emphasiza the use of coal in the near future.
                  The States of Michigan, New York and Ohio have the most ambitious plans for
              developing energy facilities in their coastal zone. This reflects their rela-
             .tively longer coastal zones, the lack of adequate inland sites, proximity of the
              coastal zone to load centers, and the generally higher energy demand in these

              three'states.
                      All planned facilities in Michigan (with the exception of the Midland
              plants) are scheduled for the coastal zone (as defined by the first tier of counties
              and a use or impact of/on coastal zone resources). Of these facilities four are
              coal-fired, two oil-fired and five nuclear-fired, totaling 10,550 MW by 1984.
                      Nuclear generating capacity comprises almost 50% of planned capacity,
              with the oil and coal being respectively 16% and 33% of the scheduled generating
              capacity. This scheduled fuel mixture represents an increased emphasis on
              nuclear generating capability in Ohio and New York, similarto what has been
              found in Illinois. Within Michigan a number of nuclear facilities have been
              delayed or cancelled for such reasons as lack of capital, equipment delivery
              delays, inflation, questions over fuel availability"and safety, etc. Nuclear
              generating facilities have been hardest hit by delays and cancellations. The
              problems currently faced by the Michigan utilities apply to all types of electric
              generating plants as well as to utilities in the other states. The current
              decline in electric energy demand coupled with high reserve margins and lack of
              utility capital have been the main reasons for the delay in Michigan's scheduled
              generating capacity additions. These problems notwithstanding, the coastal
              counties of Michigan have the most ambitious energy facility development plan of
              any Great Lakes state. The justification for siting in the Michigan coastal zone,
              ease of fuel transportation, proximity to load centers, relative availability of
              coastal land, sufficient quantities of water and the design of the power grid,
              will continue to be the reasons for power plant siting there. Currently, the
              utilities plan to continue construction of coal-fired plants for the mid-term,
              hoping that nuclear generating capacity can be added soon to prevent future
              electric power shortages.
                      The Ohio utilities are also planning a large nuclear power generation
              development program. All plants scheduled for the Ohio coastal zone through 1985
              are nuclear facilities. Currently, only one nuclear facility is being planned
<pb n="373" />

                                                353

          outside of the coastal zone, with the remaining scheduled capacity for the state
          consisting of eight coal-fired plants totaling 3,815 MW. The pressure on the
          Ohio coastal zone for energy facility siting is expected to continue to grow.
          The demand on the coastal zone will be for both siting and water resource access.
          The Ohio utilities face many of the same problems as the other Great Lakes states'
          utilities with respect to construction delays, capital shortages and siting
          problems. The intensive development of nuclear power in the Ohio coastal zone

          indicates a shift in the fuel mix of the state from almost total coal-fired base

          load generation toward a more balanced nuclear-coal mix.
                  The New York state fuel mix for electric generation deviates from the
          seven other Great Lakes states through its heavy reliance on oil- and gas-fired
          generation. The scheduled changes in capacity indicate a lessening dependence
          on oil and a relatively large increase in nuclear generating capacity. Statewide,
          seven nuclear, four coal- and three oil-fired plants have been scheduled through
          1984, totaling approximately 12,000 MW (3031. Of these facilities four hav e been
          located in Great Lakes coastal counties: two nuclear facilities, one coal-fired
          facility and one oil-fired facility. Of New York's 292-mile Great Lakes shore-
          line, approximately 134 miles of this is agricultural or undeveloped [436]. Due
          to the problems of siting and water availability within the state, the pressure
          for energy facility siting in the coastal zone will increase. As indicated
          earlier the power flows in New York are generally east'and south, with areas
          such as Oswego becoming major exporters of electric power. The role of nuclear
          'generating capacity can be clearly seen as expanding. The future role of coal is@
          projected to increase slightly statewide, while the use of oil is.projected to

          decline in relative terms.

                  On a regional basis more nuclear generating facilities have been
          scheduled than either oil or coal facilities. However, the number of delays and
          cancellations announced during 1974-1975 reduce significantly the amount of
          nuclear capacity that will come on line during the next ten years. This gap in
          generating capabilities will more than likely be made.up by fossil fuel-fired
          plants (predominantly coal), giving the/utilities time to see how post-1973
          growth patterns develop with respect to both demand and fuel type. During the
          mid-1980's the utilities' on line capacity will increasingly reflect their effort
          .to cope with foreseeable fuel, legal and environmental restraints.
<pb n="374" />

                                                                            354

                                                                         TABLE, 69

                                          CHANGES IN NUCLEAR UNIT SCHEDULES DURING 1972-1975
                        (All changes listed involved change in the year of commercial operation.)

                                               During     No. of units    Plant-yr    No. to       No.
                                               Year        changed         added      indefinite   cancelled
                                               1972             54            72                        3
                                               1973             52            67
                                               1974            104           201         16             9
                                               1975            102           116         Gil           12
                                               Data taken for the most part from ERDA tabulations of industry
                                               information.
                                               Nearly as many units were changed in 197 5 as in 1974, but the total
                                               impact was lower in some respects.
                                               It is noteworthy that 34 new unit orders were entered in 1974 while
                                               9 were cancelled. In 1975, only 4 new orders were entered while
                                               12 were cancelled.
                                               The 1974 changes (104) affected 56% of all nuclear units on order
                                               or under construction through 1974. The 1975 changes (102)
                                               affected 59% of the units remaining on order or tinder construction
                                               through 1975,

                                      Power    Engineering/April, 1976.

                              b. Estimated Capacity and Projected Demand
                              The ability of an electric company to meet a future electric power demand
                  level is dependent upon many factors, most of which are not controlled by the
                  utility. Availability of electric power in the future,.depends on present
                  planning and construction based upon future estimates of demand. This current
                  planning and construction for future needs is very sensitive to long-range fore-
                  casts, capital availability, assessments of fuel availability and a host of other
                  factors which since 1973 have become difficult problems for the utilities.
                              The first problem faced by the utilities is what will the future demand
                  for electricity be? Historically, demand has grown 7% annually, but during 1974
                  the growth rate was near zero. Current best estimates assume 5.5% growth rate
                  in demand,     .tapering off somewhat after 1985 [344]. Some utilities, however, feel
                  that demand may once again return to historical rates. Whatever the future
                  demand may be there is an inherent difficulty in planning and constructing for
                  unknown future demand levels in the context of the present uncertain consumption
                  patterns. In addition to uncertain demand levels, current low load factors and
                  high reserve levels further confound the future energy demand picture. Over the
                  last few years total electricity demand has grown less than peak demand, resulting
                  in lower load factors [364]. A shift towards increased peak demand in the
                  utilities' load schedule has required a large increase in peak load generating
<pb n="375" />

                                                                                                    .355

                     capabilities and produced a large reserve capacity. This accentuation of the
                     peaks in the load schedule necessitates the construction of capacity to meet
                     small peak load periods (Figure 37).

                                                                                           Figure 37
                                                                              WEEKLY LOAD CURVE

                         100

                                                                                                           N
                                                                                           N.
                         90                                                                                 PEAK

                                                                                                                                                               X

                         80

                         70

                  0      60                                                                           INTERMEDIATE

                  LU
                                 .....................
                         50
                                                                                              ....................
                  LL
                                                                                                                                           ..........
                  0
                                                                                              . .........
                                                                                                                                                       ...........
                                                                                                                                           ...................

                  z
                                                                                                                                                               ............
                  LU     40
                                                                                                                                                       .......................
                                                                                                                                                         ...... . ........
                                                   .....................
                                                                                                                                                               ......................
                                                                                                                                                                            ...........
                                                                         ......................
                         30                                                           .........
                                                                                                                                          ............         ...........
                                                                                                                                                                            ...........
                                                                                                  . ........                                                   . ........
                                                                                                                                                       ......................
                                                                          ..............               BASE
                                                     ....................
                                                                                                                  ..............                                            ........
                                            X-M4X-M............. ... ..........                               ..        .........
                                                     .............                                                                                                          ........
                                                                                                                                                Xe "N'

                                                                          ...........
                                                                                                                                                               .........    .......
                                                                                      ...................
                                 .................                                              .........
                                           ..........
                           10                                                                                                     ............
                                                                                                 ...................
                                                                                                                                                                   .......... .... . .
                                                                                                                 X X  ................ . . :-*-'-' .   :
                                                                                                                                                                       ....................
                                                                                                                                                                        . ...........
                                                                                                                   .. ...........
                            0
                                L                                                     ----TWEDNESDAY!l THURSDAY -F                                     F
                                    SUNDAY                MONDAY                T ESDAY                                                                RIDAY            SATURDAY

                                      An increase of 10% in the load factor                                            (e.g., from 50% to 66%) would
                     result in a 10% reduction of total capacity, and about 40% less peaking capacity
                     [344; p.4401. To bring about increased load factors and reduced peaking capacity
                     requirements, peak load pricing has been suggested. Peak load pricing will
                     result in redistribution of costs to various end users, but its aggregate effects
                     on electrical energy demand and in fact its very workability are less certain
                     [3441.
<pb n="376" />

                                                        356

                       The Federal.Power. Commission has suggested somereasons for the problems
               in :utility planning:

                       lapid increases 'in energy prices, the    downturn in economic
                     @i.activity, the s *luggish growth of electricity demand following
                       the Arab oil emb.argo, curtailments of natural gas service to
                       industrial customers and embargoes on     new gas hookups, and the'
                       talk of moving toward oil import independence in part through
                       increased reliance upon nuclear and coal-fired electricity
                       generation have cr  .eated-a good deal of uncertainty about the
                       growth.of future   'loadsi. Will the "pause" of 1974 be matched by
                       a 11spurt" at some laterpoint in time? Will recent historical
                       growth rates reemerge, but from a lower-thanm-anticipated base?
                       Or will growth rates continue to be lower than in the past?
                       Utilities are finding it necessary to adapt their methods o      f
                       planning for system expansion    to include the effects of consider-
                       ably more uncertainty in load    growth than heretofore 1@341.

                       Besides uncertain load growth    factors the utilities are facing difficult
               problems in assessing the future availability     of primary fuels for   electric
               power generation. The.utilities' low priority in@the FPC's natural gas allocation
               program and the nation's desire to reduce the     dependence on foreign oil suggest
               the limited future use,of these two fuels      for base load units [5341. However,
               the'cost and difficulty of   switching operating   units using-oil and gas to coal-
               -fired units indicate that  there wi 11 be a continuing.demand for these fuels by
               theAitility sector.@ Many   utiliti Ies, having accepted the limited future of using

               o
                il and gas for base laad   genera tion, are confronted by a number of constraints

               which until resolved-'serve to increase the uncertainty of future power avail-
               ability. Assuming that coal and uranium are the only fuels       readily available for
               large scale power generation, some of the restrictions faced by the utilities may
               be:.a lack of a'firm  Icommitment by the'government to the use of coal and/or.
               uranium, delays in developing new coal mining capability, especially of western
               low-sulfur coal,@doubts about th6 adequacy of coal transport facilities, contro-
               versies over clean'air regulations, uncertainties surrounding the mining and
               milling of uranium, unresolved issues of the nuclear fuel cycle, and questions
               about the availability of technology for clean coal utilization [421]. Many of
               these problems can only be remedied by1egislative or governmental administrative
               action, which again se  rves to compound the problems surrounding future power
               availability. The question of future fuel mix for power generation is dependent
               on many factors of which neither the utilities nor government have complete

               control.
<pb n="377" />

                                                   357

                    A last major factor in determining the availability of future electric
            supplies is the financing of construction. The utilities, already one of the
            most capital-intensive industries in the U.S., are facing increased costs.from.
            both owning and operating their generating units, while at the same time suffer-
            ing from a reduced earning power. Inflation, tight money and eroding investor
            confidence have contributed to a general rise in the cost of capital financing
            [5341. Environmental standards and-,construction cost escalation have also
            boosted the cost of investing.in'new capacity, The Federal Power Commission has
            suggested,some reasons for the utilities' reduced.earnings:

                    The delay by some utility managers in seeking.adequate rate relief,
                    compounded by the lag in some regulatory commission responses to
                    such requests, lower than expected sales, *  and sharply rising
                    costs of fuel and other inputs have been the principal sources of
                    earnings deficiencies. They have seriously impaired,the industry's
                    ,ability to carry out construction programs and may have put pressure
                    on some utilities to reduce these programs to levels dictated by
                    their current ability to raise capital, rather than by their judge-
                    ment concerning long-term growth expectations [5341.

                    All the above factors are shown in an attempt to understand the magnitude
            and complexity of the problem of providing sufficient future supplies of electric
            power.  Other issues such as system reliability and delays in expanding capacity
            also bear upon the problem of assessing the adequacy of future electric power
            supplies. The question of the adequacy of presently planned generating capacity
            with respect to some future demand level for electric power is one surrounded by
            many problems. Given the number of delays and cancellations    in new I generating
            capacity over the past two or three years, there is a possibility of a serious
            inadequacy of electric power if growth rates return to their historical levels
            [5641. The combined planned-and scheduled generating capacity of the eight
            Great Lakes. 5tates is 74,067 MW through 1984.  If load factors and reserve margins
            were held at 1973 levels this capacity might be  expected to accommodate an annual
            growth rate of 6 percent.

                    c. Implications of Emerging Tec ologies
                    Over the next 15-20 years no major changes in the technology of large-
            scale power production are expected to be implemented on a commercial basis. This

             Temporary decreases in sales serve to reduce current revenues without
             necessarily reducing current capital requirements.
<pb n="378" />

                                                   358

             is to suggest that current technologies will continue largely unchanged for the

             next twenty years. Efficiencies of the generating process will continue to
             improve as will those of the transmission networks. The nuclear technologies
             are not expected to change as to type or process; but rather an improvement in
             the engineering and fuel cycle aspects of nuclear technology might be expected.
             An increasing reliance on emerging coal technologies may alter the existing
             patterns of coal use. These might include-fluidized bed combustors, gasification
             or liquefaction, low Btu gasification for use in combined cycle systems, and the
             development of technologies cleaning up coal's adverse impacts. In short, major
             technological changes in electric power generation systems are not expected to
             play a large role in the next 15 to 20 years.
                     The.pressure on the Great Lakes coastal zone from energy facilities will
             continue to increase in the future. The increase in demand for energy, the
             restricted thermal capacity of many inland water supplies,  the proximity to load
             centers, and access to transport routes all suggest that demand for the coastal
             zone water resource (either direct siting on the coastal zone or simply access to
             the resource) will increase in the future. Tables 70 and 71 compile the
             'announced generating facilities in the Great Lakes Region through 1984.
<pb n="379" />

                                                                      359

                                                                   TABLE 70

                                     PLANNED     OR SCHEDULED       ADDITIONS IN GENERATING
                                              CAPACITY     IN THE COASTAL ZONE, 1976'

                                                       (Plants over 300 We)

                    State and                                                                              Date         Source of
                  Plant Name                  Fuel    Type     Mwe               County                 in Service     Information

                 Illinois

                    Notte                        ---           ---                  ---                     ---              303

                 Indiana

                    Bailly                    Nuclear          685               Porter                 Indefinite           303

                 Michigan
                    Greenwood #1                 Oil           815               St. Clair              Indefinite           303
                    Karn #3                      Oil           605                  Bay                 May, 1977            303
                    Belle River 01               Coal          697               St. Clair              Indefinite           303
                    Belle River #2               Coal          697               St. Clair              Indefinite           303
                    Campbell 03                  Coal          770               Ottawa                 May, 1980            303
                    Enrico Fermi 02           Nuclear        1,215               Monroe                 Indefinite           303
                    Greenwood #2              Nuclear        1,341               St. Clair              Indefinite           303
                    Greenwood #3              Nuclear        1,341               St. Clair              Indefinite           303
                    D.C. Cook #2              Nuclear        1,100               Berrien                Indefinite           303

                 Minnesota

                    None                         ---           ---                  ---                                      303

                 New York
                    Oswego #6                    Oil           850                  Oswego              Hay, 1979            450
                    Lake Erie   #1               Coal          850         Sheridan or Pomfret          Nov., 1985           450
                    Lake Erie   #2               Coal          850         Sheridan or Pomfret          Nov., 1987           450
                    Nine Mile   Pt. #2        Nuclear        1,080'                 Oswego              Nov., 1982           450
                    Sterling                  Nuclear        1,150               Sterling               May, 1984            450

                 Ohio
                    Davis Besse  #1           Nuclear          906                  Ottawa              April, 1977          325
                    Davis Besse  f2           Nuclear          906                  Ottawa              April, 1983          325
                    Davis Besse  03           Nuclear          906                  Ottawa              April, 1985          325
                    Erie #1                   Nuclear        1,200                  Erie                April, 1984          324
                    Erie #2                   Nuclear        19200                  Erie                April, 1986          324
                    Perry #1                  Nuclear        1,205                  Lake                Dec., 1981           325
                    Perry #2                  Nuclear        1,205                  Lake                June, 1983           325

                 Pennsylvania

                    None                                                            ---                    ---               ---

                 Wisconsin
                    Pleasant    Prairie #1       Coal          617               Kenosha                April, 1980          303
                    Pleasant    Prairie #2       coal          617               Kenosha                April, 1982          303
                    Lakeside                     Coal          310             Milwaukee                April, 1982          303
<pb n="380" />

                                                                                                TABLE 71
                                    PLANNED AND SCHEDULED ADDITIONS IN GENERATING CAPACITY IN THE GREAT LAKES REGION

                                                                                              1976 - 1984

                                                                                     (Plants Over 300           MW)
                                                             NOTE: No. of facilities indicated in brackets,

                                               ILLINOIS           INDIANA 2       MICHIGAN   3     MINNESOTA  4         NEW YORK 5           OHIO 6          PENNSYLVANIA 7     WISCONSIN  8

            state Total Coal                   4,04OMW [81       5,31511W 110    2,154 131           3, 46Q4w  51       2,703MW 141      3, 8153W C 8 1      3,60OMW 131         3, 3 3 714W 71

            Percent o  f Total                    27%               65%                26%             100%               227               38%                 28%               IOU

            State Total Oil                    2,50OMW  (5j                      1,443MW f2l            None            2,OOOMW [3)         None             1,191MW f2l          None

            Percent of Total                      16%                                                                      17%                                   9%

            State Total Nuclear                8,536MW [81      2,905MW (3)      4,622MW [51            None            7,35OMW 17  is  6,262MW 161          8.01OOMW [51         None.

            Percent of Total                      57%               35%                56%                                 61%                %                 62%

            Constal County Total Oil              None              None         2,154MW [31            None              850MW [I]         None                None             1,560 MW (31         0

            Percent of Coal                                                        100%                                    46%                                                       47Z

            Percent of Oil                        None              None         1,443MW [21            None              850MW [11         None                None               None

                                                                                   100%                                    42%

            Coastal County Total                  None             645MW [11     3,35111W [31           None            2,25OMW [21     4,222MW 141             None                None
            Nuclear

            Percent  of Nuclear                                     22%              73%                                   31%              67%

         I Reference No. 199    and 303                                                                            (a) Announced between 1985-1990 (8) nuclear plants
         2                  303                                                                                       totaling 10,30OMW plus 3,OOOMW of pumped storage.
         3                  303 and  395
         4                  303
         5                  303 and  450                                                                           NOTE:   Data developed from FEA information.
         6
         7                  236 and  303
         8                  199 and  303
<pb n="381" />

                                                 361

                                               Chapter V

                               REGIONAL SCENARIOS OF ENERGY DEVELOPMENT

           A. INTRODUCTION TO SCENARIO APPROACH

                   The rates of growth in demand for electrical power and the fuel mix used
           to generate that power are the key variables in attempting to evaluate the
           electric energy future of the Great Lakes coastal zone. To facilitate the  assess-
           ment of the future pressures put on the Great Lakes coastal zoneby electricity
           generating facilities, four alternative fuel mix scenarios have been postulated.
           The basic approach is to make certain assumptions for each fuel mix future and
           then examine the possible impacts if they were to hold true. The scenarios will
           then be evaluate'd in the context of three electrical demand growth rates to
           provide an indication of the resources required for future energy facility

           development.
                   This study shall define a scenario as a set of assumptions relating to a
           particular fuel mix and its ab ility to generate electric power in required
           quantities. A scenario should not be confused  with a forecast. Each scenario
           is developed on assumptions which provide a basis foranalysis of the possible
           future. It is not based on conclusions or predictions as to what the future will
           be. Furthermore, scenarios do not assess the feasibility of the political,
           economic, and social events which must take place for any particular scenario to

           ,occur.
                   The number of potential fuel mixes for future electric power generation
           is essentially unlimited. The scenarios have been selected to be representative
           of the major potential fuel, mix development routes. This method allows for a
           comparison of their associated impacts and suggests the range of future fuel
           mixes that can occur. The values assigned to each scenario represent a reason-
           able level of supply and utilization.that might be associated with the different
           technologies of the scenarios.
<pb n="382" />

                                                    362

                      The attempt has been made to evaluate those scenarios which, under vary-
              ing situations and circumstances, have a potential of occurring within the 20-
              year time span being considered. A comparison of multiple alternatives serves    to
              illustrate many of the variables influencing the Great Lakes Region's energy

              future.
                      A further objective of the scenario ai- roach is to identify and evaluate
                                                            pp
              possible problems and impacts of future developments, thereby aiding policy
             .decisions for power facility siting. It should be noted that no one set of.
              policy options is associated with a particular scenario. Although the relation-
              ship between energy production and the economy has not been thoroughly investi-
              gated in the context of this study, it is assumed to be uniform throughout the
              four scenarios. The basic energy demand for end use is constant for each

              scenario.
                      The four scenarios are based on variations in the fuel mix used for
              electrical energy production. As differences in the relative capital costs and
              environmental considerations among types of generating facilitie's have been used
              elsewhere in this study, the fuel mix for power generation becomes the critical
              issue. (Another important issue is that of development of controlled technology
              for the environmentally sound use of these fuels.) The availability, price, and
              environmental and social impact of primary fuels for electric energy generation
              are major questions which point to the important role fuels will play in the
              future. The future fuel mix is_dependent upon factors such as: federal and state
              regulations, commercialization of new technologies, availability of foreign fuel
              sources, and other facts which will be discussed as they relate to fuels for
              electricity production.
<pb n="383" />

                                                  363

           B. DESCRIPTION AND DETERMINANTS OF SCENARIOS

               1. SCENARIO I    RECENT TRENDS,

                   The nature of the utility industry is such that plans for the next ten
           years have been fairly well established. Such planning is directed by the lead
           times necessary for developing and constructing new generating facilities.
           Development time for nuclear facilities is often 9-12 years and 5-7 years for
           large fossil fuel plants, from planning through operation. Given the planning
           requirements of utilities it would appear that the capacity mix.used for power
           generation is "locked in" until 1983 or so. Thus, the recent trends scenario
           includes the 1976-1983 time period and the facilities scheduled to  come on line

           as its base.

                   The assumptions within this scenario suggest that present  fuel mix trends
           will stay relatively unchanged over the,next 20 years, except that  future
           capacity will continue to grow some 35%. Future fuel requirements   might be
           predicted by extrapolating the current consumption patterns at a given electrical
           demand growth rate.
                   As mentioned previously, these scenarios have been developed.to show
           what the relative pressures and resource demands on the Great Lakes coastal zone
           might be in the future. Essentially, recent trends is a continuation of presently
           utilized fuel mix site selection process and power generating technologies. The
           recent trends scenario assumes no major change in regulatory policy or in the
           social instituttions which may affect the use or supply of electric  power.. This
           base case scenario is one with whi ch the other scenarios will be compared and
           shall be used as the departure point for developing the o.ther cases.
                   Recent trends is the only scenario which deals explicitly with oil- and
           gas-fired generation. As the percentage of power generated from oil and gas is
           expected to hold fairly constant until the early 1980!s and then decrease, the
           role of these fuels in power generation will only be discussed in the context of

           the recent trends scenario.

                   Three major variations appear in currently used fuel mixes. The States
           of Ohio, Michigan, and Pennsylvania use the highest percentage of coal for power
           generation. Wisconsin, Minnesota, Indiana, and Illinois use somewhat less.
           New York State uses the least amount of coal of any Great Lakes Region state
           [192/4211. A weighted average was used to determine the present regional fuel
           mix (of which a.breakdown appears in Table 75). The. current planned.and scheduled
           facilities were then worked into the regional generating fuel mix. The result is
<pb n="384" />

                                                         364

                                                       TABLE 72

                                           SCENARIOS:   MAJOR ASSUMPTIONS

                                             FOR BASE  LOAD GENERATION

                                           FOR THE REGIONAL SCENARIOS

                                  RECENT TRENDS      HIGH COAL            HIGH NUCLEAR          NEW
                                                                                            TECHNOLOGIES

        ECONOMIC

           Fuel Costs            Oil and natural    Less expensive     High fuel costs      Increasing for
                                 gas increasing     fuel costs         due to incomplete    conventional
                                 faster than coal.  than,recent        fuel cycle and       fuels.
                                 Overall increase   trends             increasing.
                                 through 20-year    scenario, but      scarcity, plus
                                 period             increasing         delay in breeder
                            f                       due to environ-    development
                                                    mental consi-
                                                    derations

           Capital               Tight for next
           Availability          5 years then
                                 expanding,                            Federal Assistance
                                 closely related
                                 to state of
                                 economy

           G.N.P. growth         overall between
                                 3 and 4%

        DEMOGRAPHIC
           Population            OBERS "E"
                                 assumptions

        RESOURCES
           Coal                  Local resources
                                 stated in study,
                                 national
                                 resources;
                                 1975 BOM est.

           Labor                 Available

           Water                 Available, but
                                 at higher costs
                                 due to env.
                                 considerations

           Oil &amp; Natural gas     Available, but
                                 decreasing after
                                 mid-1980's.
                                 Foreign supplies
                                 also,available
<pb n="385" />

                                                     365,

    SCENARIOS: MAJOR ASSUMPTIONS (Continued)

                                                                                            NEW
                             RECENT TRENDS       HIGH COAL           HIGH NUCLEAR       TECHNOLOGIES

    ENVIRONMENTAL

      Air/Water             Existing
                            standards/ meet
                            new schedules

      Land                  Stricter stip-                        Increased siting      Little change
                            mine laws                             control               from R.T.

    TECHNOLOGY

      Electric              Minor increases                                             Major increases
      .Production           in efficiency                                               in the overall
                                                                                        efficiency of
                                                                                        energy production
                                                                                        process

      Plant factor          minor increases

      Environmental         Improvement in     Acceleration of    Same as R.T.
                            pollution control R.T. development
                            technology

      Fuel Research         Continue present                                            Increase in
                            trends                                                      research for new
                                                                                        technologies

    INSTITUTIONAL
      Anti-trust/           No major change
      tax structure

      Nuclear Power         No significant     More anti-         Polic ies which       No major change
                            change             nuclear policy     promote nuclear
                                                                  development

      Price regulation      Gradual de-
                            regulation.of
                            all fuels

      State/local           No limitations
      Policy                to growth
<pb n="386" />

                                                      366

               a projected.1995 fuel mix comprised of'50% coal-fired generation, 30-35% nuclear,
              .and 15% oil, gas, and hydroelectric.

                   2. SCENARIO II    HIGil COAL ELECTRIC
                       With the recent trends scenario extending until 1982-1983, a'high coal
               fuel mix would not be evident before the mid-80's. A possible exception to this
               supposes that a change in the fuel mix of currently planned facilities, combined
               with an increase in demand for electrical power, would favor the growth of fossil
               fuel plants to meet this demand, due to their considerably shorter construction
               period. The variations among current fuel mixes in the eight Great Lakes states,
               shown on Table 75, indicate that many states currently have what might
               be termed "high coal" fired generation.' For these states the variations between
               their present fuel mix and the high coal scenario may not be substantial.
                       There are certain conditions ne .cessary for the development of a high coal
               scenario. A primary condition would be the further development of reliable
               technologies for the clean utilization of coal, including desulfurization and
               removal of particulates and.NOx. At the same time, actions such as a reduction
               in air quality standards 6n a case-by-case basis remaining consistent with
               health and'environmental standards), the development of more mining and transpor-
               tation activity and a political commitment sufficient to sustain the increased
               utilization of coal for power generation would be needed for coal to play a
               larger role in generation of electric power. Furthermore, strenuous use o    f coal
               would be facilitated by a higher relative cost for nuclear power or the imposi-
               tions of restrictions on nuclear facilities   development.
                       It is assumed here that the coal fuel mix will be approximately 15-20%
               higher between 1990 and 1995 than in the recent trends scenario. The fuel mix
               for the high coal scenario will break down as follows: 70% coal-fired, 15%
               nuclear and 15% oil, gas, and hydroelectric.
                       An additional factor influencing the   rate of coal use is the rate of
               conversion of oil-fired generating plants to   the burning of coal. This would
               apply to both currently operating and planned facilities. The federal, govern-
               ment will be the primary factor in determining the rate at which conversion will
               take place, assuming that some policy position will be forthcoming on oil    to coal
               conversion of generating facilities. Currently, two plants in New York, the
<pb n="387" />

                                                 367

          Albany and Danskammer, have been ordered to convert to coal by the Federal Energy
          Administration.    (The order for the Albany Station-is not presently effective.)

              3. SCENARIO III - HIGH NUCLEAR ELECTRIC

                  The high nuclear scenario suggests a rapid development of nuclear
          generating capabilities exceeding that associated with recent trends. Nuclear
          generation of electrical power remains one of the few fuel mix options suffi-,
          ciently developed to assume a major  role as a regional power supplier. Nuclear
          power currently provides 10-12% of the Great Lakes Region's electrical energy
          demand. As is projected in the   recent trends scenario, by 1995 it will comprise
          approximately 30-35% of the,generating capacity. The nuclear scenario then
          further assumes that the Great Lakes Region's nuclear generating capacity will
          be approximately 45% of the 1995 total generating capacity.
                  Nuclear development on such a scale would require major actions by both
          the utilities and the fe deral government. The acceleration of the siting process
          in conjunction with the alleviation of capital cost and formation problems of
          nuclear facilities would be necessary in order to achieve a high nuclear scenario.
          Furthermore, problems in the entire nuclear fuellcycle, from scarcity of fuels
          and transportation security to radioactive waste, require serious consideration
          and improvement. In short, the questions being raised regarding the expansion
          of the nuclear power industry, combined with the long lead time for planning and
          construction, indicate that a firm commitment to continue building will be

          needed in the near future.

                  The high nuclear sc enario will reflect the continued decrease in the use
          of oil and natural gas as primary fuels for base load power generation. Coal-
          fired units will make up the remaining required generating capacity (45%), with
          few large coal units-scheduled past 1985.

              4.. SCENARIO IV - APPLIED EMERGING TECHNOLOGIES

                  The fourth scenario assumes a more rapid development of new technologies
          for power generation than is presently anticipated. During the 20-year period
          under consideration, the rate of new technology implementation is dependent on

            Personal communication, Brookhaven National Laboratory.
<pb n="388" />

                                                    368

              the price of conventional fuels (including nuclear), the emphasis on commerciali-
              zation of new technologies, and the size of electricity demand. Problems with
              the use of the two primary fuels for future power generation might limit the
              rate at which facilities fired by coal or nuclear fuel come on line. Such a slow-
              down would provide additional impetus for the development and commercialization
              of new power producing technologies.
                      The environmental and social problems of coal use have been investigated,
              but there remain many unknown factors associated with coal utilization. The
              questions of siting, nuclear wastes and the availability of fuel.are crucial to
              the further development of nuclear facilities. Thus, the degree to which the
              two primary fuels may be utilized in the future is an unanswered issue.
                      One new technology would be,the use of a low Btu coal-gasification
              process for production of fuel in a combined cycle generating unit, resulting in
              higher heat rate efficiencies and prevention of the more deleterious effects of
              coal utilization. Such a project is currently planned by Commonwealth Edison
              on a 100-200-MWe scale, with future development in some degreeidependent on the
              facilities' operating record.
                      A fuel mixture composed of garbage-coal or biomass.(i.e., crops grown
              specifically for combustion on energy plantations or simply agricultural,wastes)
              could be utilized in conventional generating facilities, thereby reducing
              resource pressure and the negative impacts of conventional fuel,use.
                      Although no firm commitment has been made by private industry or govern-
              ment, high Btu gasification or liquefaction could potentially make an impact on
              electrical generation systems by 1995 (by decreasing the demand,due to end use
              substitution). The use of fluidized bed systems for combusion of coal would
              reduce the negative effects of coal utilization as well as increase generation
              efficiencies. (This changes only the process and not the primary;fuel, but as
              a new technology it is included in the fourth scenario.)
                      Further new technologies might include: wind-actuated;electric power
              generation; small-scale "total energy" systems for commercial or,industrial use,
              which would greatly increase overall efficiency; bioconversion processes for
              natural gas production and use in electrical generating facilities; solar-assisted
              heating units which would decrease electrical demand thereby possibly,altering
              the fuel mix; fuel cells for thermo-electric generation; and generally, combina-
              tions of technologies which produce electric power and reduce the pressure on
              the primary fuels.
<pb n="389" />

                                                 369

                  The future of any of these technologies is uncertain. Given that these
          and other technologies have potential for development and implementation in the
          next 20 years, their possible impact should be noted.

                  Under optimum conditions the generation attributable to such technologies
          would be 15 to 30% of the region's total by 1995. The remaining generating
          capability would come from standard sources with conventional coal boilers
          constituting approximately 40-50% and nuclear accounting for 20-35%.

          C. INTRODUCTION TO DEMAND PROJECTIONS

                  While the fuel mix for electric power generation is fairly well set for
          the next several years, the demand for power is not. Of the two critical
          variables for future electric power production, the demand variable is the most
          difficult to estimate over the time horizons of this study. The demand rate for
          electric power, then, may be the only major surprise in the electric power
          equation for the Great Lakes Region.
                  Historically, electricity demand has been the major factor,in determining
          the rate of electrical power supply. With the advent of higher prices and
          shortages of primary fuels for generation, demand for power is no,longer the only
          variable to consider. Factors such as fuel shortages, rapid increase in prices,
          fluctuating demand levels, and governmental regulation have increased the
          difficulty and complexity of projecting future demands for electric power [549],.
          But the long lead time necessary for power plant planning is the very reason,why

          forecasts must be made.

                  Electrical demand forecasts have been studied in order to  give an idea,

          of the possible future pressures on the Great Lakes coastal'zone due to the need
          for siting increasing numbers of power generating facilities. A combination of
          different growth rates with fuel mixes may give an indication of the resource
          requirements necessary for various electrical power futures. 'These requirements
          may then be used to develop policies for future power plant-planning..@
                  The electrical demand growth rate is that figure which represents 'the
          percentage increase over the previous time period (defined as one year) in
          electrical power consumed, as determined by the additional number of kilowatt
          hours consumed. Before 1973 this figure had grown at an average rate of
          approximately 7% per year, or doubling every 10 years. Since.1973 the demand   for
          electrical energy has fluctuated greatly. It is currently 5.4% per year, but
<pb n="390" />

                                                        370

                the future level of this number is one of great contention [4211.
                        The variations among electrical energy:growth forecasts are tremendous,
                largely due to the absence of a stanaard methodology and a single set of reliable

                facts..

                        Given'the speculative nature of forecasting and its reliance on past
                trends, 100% accuracy should never be expected. Growth forecasts are generally
                derived from a model describing the process.that is under-study. These models
                vary greatly with respect.to. scope, specificity, assumptions, emphasis, etc.
                Development of a single, comprehensive model is not recommended [45]. The
                degree of sophisitication and variation among forecasting models is a significant
                factor in assessing the usefulness or.accuracy of growth models. Regardless of
                their,sophistication, econometric models always depend on statistical observa-
                tion and interpretation,of the past-[549] and hence are,only valid as long as
                structural changes of relationships or independent variables do not occur
                during the models' time frame [5491.
                        To suggest that prediction is the purpose for which models have been
                developed would be misleading. Rather their purpose is to identify, organize,
                and clarify the parameters and variables influencing electrical power demand,
                hopefully giving improved information as to how the future may develop.
                        When analyzing electric energy forecasts there are a number of major
                points which should be kept in mind, including: the time span being studied, the,
                need to understand key assumptions and how they are incorporated into the fore-
                cast, for whom and by whom the studies are prepared,    the comprehensiveness of the
                model, and the degree of detail it covers. In addition, the capabilities of the
                forecasting model (particularly in adapting to policy and technology changes) and
                its economic aspects  (i.e., inter-fuel and regional competition, determinants of
                supply and demand).[45] are important,to understand.
                        Actual projection  'analysis is based on certain key factors which are
                representative of the individual variables that have been selected as effectors
                of future demand for energy. The factors to be considered and their weighted
                importance in the analysis are very important, as the potential for altering the
                analysis and outcome is greatly influenced by the factors selected. As in the

                  Dr. Miller B. Spangler, An Appraisal of Future Energy Developments Affecting
                  the National and Regional Economic Outlook for Nuclear-Generated Electricity
                  During the Next Forty Years. March 1976.
<pb n="391" />

                                                 371

          selection of the methodology and assumptions to  be employed for an analysis, the
          key factors are selected on the basis of their judged relative importance by the
          group doing the analysis.

                  The factors used in assessing future demand for electrical energy are
          different for long- and short-term projection analysis. These factors also vary
          among-projections which analyze the same time period. "The short-run projections
          (2-3 years) must recognize the experienced factors such as the current recession
          period, level of unemployment, and the leading economic indicators as the key
          variables" [394]. "Long-run projections, on the other hand, hinge on factors
          such as trends in population growth, household formations, changes in stock of
          appliances, long-term business and economic outlook, availability of fuel
          substitutes and their prices, environmental regulations, and technological change"
          [3941. Somewhat differently, Oakridge National Laboratory considers population
          growth, per capita personal income, price of electricity, price of competing
          energy sources and price of electric appliances as the key   factors in assessing
          future electricity demand.   The key factors used in a projections analysis are
          as important in shaping the  final output of energy demand modes as ate the
          assumptions and methodologies employed.

          D. REVIEW OF PAST PROJECTIONS

              1. OVERVIEWS OF AVAILABLE PROJECTIONS'

                  The projected growth rates analyzed for this study vary'-greatly with
          respect to region, fuel mix, approach and results. Projections relevant to the
          demand for future electrical power were gathered to assess the variations
          described above and how they might relate@to the Great Lakes coastal zone. Given
          that no projection has been done specifically for the Great Lakes coastal zone,
          the growth rate for electrical power in this,region can only be inferred.
          Table 73 lists the projections reviewed, along with a number of major factors
          which should be considered during a review of the projections.
                  The degree of diversity between the projected growth rates can be
          explained by the various assumptions., methodologies and key factors used in the
          respective studies. As might be expected-there is some degree of correlation
          between the party preparing the projections and their implications for future
          growth rates. Those groups having a direct relationship to electrical energy
          production (i.e., utilities, component producers, or independent firms hired by
          utilities) tend to develop higher rates of projected electrical energy demand
<pb n="392" />

                                                                                      372

                                                                                   TABLE 73
                                                      OVERVIE14 OF ELECTRIC POWER PROJECTIONSi/

                                                                                                                     FORECASTED
                                                                                                                  AVERAGE COMPOUND
                                                                                                                  RATE OF ANNUAL
                             FORECASTER            DONE FOR               REGION                  PERIOD          DEMAND GROWTH %              COMMENTS

                       Duane Chapman,                                 E.C.A.R.                1974-1980               2.6%              Agricultural economist,
                                                                                                                                        Cornell University

                       New York Power           Utility planning                                 late                 4.0%  declining
                                                   p\                                         1970's-1990
                         Pool                   pur use               New York                                     to 3.5%  by 1990

                       Stanford Research        Wisconsin             Wisconsin               1975-2000               4.5%
                         Institute              Utilities Assoc.

                       Jim Griffin                                    U.S.                    1974-1981               4.8%              Economist, University
                                                                                                                                        of Pennsylvania

                       Michigan Public                                Detroit Edison          1979-1982              4-5.6%             Re-forecast of companyts
                         Service Comm.                                Service Area                                                      forecasts, same
                                                                      Consumer Power                                 4.6-5%             methodology, different
                                                                      Service Area                                                      assumptions

                       Detroit Edison           Planning use          Detroit Edison          1974-1985               5.6%
                                                                      Service Area

                       Consumers Power          Planning use          Consumers Power         1974-1985               5.0%
                                                                      Service Area

                       Dept. of Interior                              U.S.                    1975-2000               5.5%              Revised Edition
                         (Bureau of Mines)                                                                                 -

                       Edison Electric                                U.S.                    1975-1980               6.0%
                         Institute

                       Utilities                Ohio Power Siting     Ohio                    1974-1985               6.13%
                       within states               Commission

                       Cincinnati Gas 6,        Ohio Power            Cincinnati G.&amp; E.       1976-1986               6.7%              Service area of 3000 sq. mi.
                         Electric Co.           Siting Comm.          Co. Service Area                                                  and 1.7 million people

                       R.T. Cornell                                   U.S.                    1977-1990               8.0%              Utility Securities Analyst
                                                                                                                                        for Institutional Investors,
                                                                                                                                        E.F. Hutton Co.

                       Westinghouse                                   U.S.                    1975-1980               9.1%

                  Adapted from Forecasting Electric Enersty Demand in Michigan, by Waino H. Pihl and Iawrence M. Glazer, February, 1976.

                     growth than groups not so involved. This is not'to suggest that either group's
                     projections are deliberately biased. Differences are due to the different natures
                     of the groups, the emphasis placed on different variables, and human judgement.
                     The differences in the projections, between what might be termed vested interest
                     groups and independents, should further emphasize the need for projections from
                     many sources in assessing the needs for future power requirements.
                                   The majority of the states within the Great Lakes Region have limited
                     capability for making independent electrical energy demandforecasts. The Public
                     Service Commissions (in some states Public Utility Commissions) within the eight
<pb n="393" />

                                                373

         states rely heavily upon the utilities for their future demand forecasts. Due
         to limited staff, budget, resources, etc., these'commissions' forecasting
         capabilities are often limited to analyzing the  utilities' projections. *   More
         often the commissions' role has been to act on a request for a construction permit,
         deciding whether or not a new plant should be approved.
                 Many of the state energy agencies' electrical demand   forecasting
         capabilities are also very limited,,such that in many states  only the utilities
         have the capability of making long-range energy fore-casts. Minnesota, as an
         example of a state having forecasting capabilities, has two  forecasting groups:
         one concerned with reviewing the utilities'. forecasts and a second producing
         independent energy forecasts working with the Minnesota Energy model. Wisconsin,
         in conjunction with the University of Wisconsin, utilizes the Wisconsin Energy
         model (WISE) in assessing the fut ure state electrical demands. Overall the eight
         Great Lakes states have limited forecasting capabilities. Hence there tends to
         be a reliance solely on utility forecasts to assess the future needs for
         electrical energy.
                 The Ohio Power Siting Commission and the  New York State Board on Electric
         Generation Siting and the Environment are the only state agencies within the
         Great Lakes Basin that deal specifically with the issue of the siting of electri-
         cal generating facilities. The Ohio Power Siting Commission has the capability
         of making electrical demand forecasts independently of the  utilities. This fore-
         casting ability allows for verification of and comparison with the projections
         prepared by the utilities. The commission also reviews the utilities' projections
       "for compilation of the state's ten-year forecast for electric power [5141. The

         format and content'of the forecasts are specified by the commission with a
        'primary goal of the process being the need for the utilities to justify the
         rationale thatunderlies their decisions to strive for a given resource require-
         ment [514]. Towards this end the commission has'stipulated that all assumptions
         and special information related to the forecasts@be listed and explained. The

         Commission reports:

                 While most of theutilities complied with the requirement
                 (9-01(D)(3)) to list the assumptions used in the preparation of

           Personal communication, Office of Energy Emergency Assistance, Wisconsin.
<pb n="394" />

                                                      374

                        the forecasts, some reporting utilities either failed to justify
                        the inclusion of these assumptions or described the assumptions in
                        such'general terms as t'o be meaningless. Further, the impact of
                        the assumptions on their ba!Tic forecast was not adequately addressed
                        [5141.

                        Other issues which the commission felt to be inadequately addressed in
               the utilities' forecasts included the impact of alternate rate structures on
               demand, the effect of changes in the relativeprice of electricity, and the
               optimal use of generation capacity. The role of the Ohio Power Siting Commission,
               .as both reviewer of utility forecasts and forecaster, is to "review and comment
               and certify the need for new facilities" in Ohio [514).

                   2. ANALYSIS OF SELECTED PROJECTIONS

                        A detailed analysis of energy projection models has been performed by
               Argonne National Laboratory. This study gives useful insight into the workings
               and, problems of energy modeling. The following comments were developed to better
               understand differences.between projections, what they were designed to do, how
               the@ developed, as well as shortcomings of the energy modeling situation.
                        Argonne's purpose was to evaluate several existing energy models to
               determine their usefulness for ERDA@s Regional Studies program and identify areas

               where future work should be undertaken due to certain weaknesses found in the

               models. Three basic criteria were used in evaluating the models: (1) model
               capability, (2) economic aspects, and (3) model comprehensiveness.
                        Projection models can be divided into "local impact," used for substate
               or state regions, which are particularly useful for end-use details, and "National
               synthesis," which analyzes energy availability and/or consumption on a larger
               scale [45]. These two basic groups differ markedly irr their abilities and out-
               puts, such that in many instances combining the two provides a more comprehen7-
               sive result. For instance, if a regional policy'affects the national energy
               picture (such as high energy facility development in the Great Lakes coastal
               zone), this output could then be used as input for the larger national model.
               Conversely, a national model could provide a regional energy supply and demand
               analysis consistent with national policy as input for a local model [45]. The
               point being that rarely will a single model be sufficient to cover all relevant
               relationships, suggesting that more than one  projection should be utilized in a

               decision-making process.
<pb n="395" />

                                                  375

                   The Battelle Col.umbus-EPA Energy Quality model, the Proejct Independence
          Evaluation System, and the Wisconsin Energy model are representative of sophisti-
          cated energy projection models that vary in methodology, scale, and type of out-
          put. "The Battelle-EPA Energy Quality model is a large linear' program that
          determines a minimum national cost of the distribution of coal, natural gas,
          residual oil, distilate oil, and nuclear power in the contiguous United States
          under specified conditions of supply, price and demand.'      The model's,output
          describes the fuel policy and use schedule for each region (PAD or AQCR) and a
          schedule of fuel shipped from a supply to a use'region [45]. Due to its spatial
          detail and regionalized energy consumption and costs (including transport) it is
          considered of value when undertaking regional energy studies [451.
                  "The Project Independence model QIES) of the nationts energy system is
          probably the most comprehensive and all-inclusive energy model yet produced."
          .This national model has the capability of analyzing regional energy situations on
          an interregional basis with.the end product being an instrument against which
          policy and technology development fornational and regional energy strategies may
          be measured and evaluated. The model provides for total energy demands to be
          linked to economic growth. With the detail in the.level of supply and demand,
          interfuel competition canbe assessed [45]. The PIES model has been criticized
          for underestimating capital and environmental costs, the uncertainty in supply
          and price of fuels, and the lack of constraints on production [451.
                  With -respect to the."local impact" type model the Wisconsin Energy model
          (WISE model) has "stressed flexibility with maximum room for innovations"         in
          developing their modular f ormat. "The main subcomponents of the system are the
          sociIoeconomic, primary.energy source, end-use demand, electricity production,
          and environmental impact models," [45] which provide excellent evaluation.capa-
          bility on the state level. The model can evaluate local regulatory policies,
          provide for analysis of regional technology options, include engineering design
          parameters, and assess the social   and economic impacts of energy systems [451.

             Battelle Columbus Laboratories, A Proposal to Develop Energy    Price and
             Availability Projections, p. A-2, April, 1973.

             Federal Energy Administration, Project Independence Report, Project
             Independence, p. 18, November, 1974.

             Foell, W.K. The Wisconsin Energy Model:A Tool for Regional Energy Policy
             Analysis, Energy Systems and Policy Research Report No. 101, p.6, November,
             1974.
<pb n="396" />

                                                        376

                The model further permits a description of future changes i   n policy and tech-
                nology to examine the resulting.energy scenario. The WISE model "does not predict
                the future, nor constrain all future trends to be like the past" [45]. With
                modification the WISE model could be utilized by other states and as a data base
                input into inter-regional (national synthesis),energy projection models.
                        The primary,results of Argonne's analysis of these state energy projec-
                tion models is as follows: (1) all models were found deficient in that they
                failed to.consider interregional competition.and did not integrate    energy supply
                and demand forecasts with economic growth, and (2) none of the models studied
                were able to-adequately predict and analyze regional effects of national.energy
                actions [45]. This analysis should help to emphasize that the variations among
                projection models,.due to differing methodologies,assumptions, and purpose, are
                quite large. They also indicate that relying on a single model or source in
                developing policy or plans for future energy demand should be avoided.

                    3. SELECTED GROWTH RATES FOR PROJECTIONS

                        For the purpose of evaluating future potential pressures on the Great
                Lakes coastal zone, a number of potential fuel mix scenarios have been postulated.
                The actual pressure-on the coastal zone will be a function of the increase in the
                demand for electric power, the utilities' ability to construct sufficient
                capacity, and the type of fuel chosen for the new gene   rating capacity. The
                choosing of an average or best-gues electrical demand growth rate would assume
                that accurate knowledge of the future energy picture is known. The use of high,
                medium, and low growth rates encompasses a number of possible energy futures.
                More importantly it gives a range to the potential impacts of new energy facili-
                ties from which it may be-possible to determine the requirements for fulfilling
                the various scenarios. The integration of these growth rates with the four
                scenarios described earlier will give an indication of the resources that might
                be required by a certain fuel mix and electrical demand growth rate. These
                figures can then be used by interested parties in developing policies that relate
                to the fuels (need, transport, cost, etc.), siting, and regulation of future
                plants.
                        To this end, three growth rates have been chosen representing a low
                (3% per annum), a medium (5.5%) and a high (8%). The low growth rate might be
                tied to high conservation rates; the medium rate will be close to the electrical
                demand growth rate since the 1973 Arab,oil embargo; and the high growth rate
<pb n="397" />

                                                377

          might be associated with an intensive electrification process due to substitution

          for other fuel types.

          E. IMPLICATIONS OF SCENARIOS

                  The direct extrapolation-of generating capacities does not take  into
          consideration critical factors which will greatly influence the determination of
          quantities and types of current generating capacity. Thus, in conducting the
          resource impact analysis, a number of assumptionswere made which have@a direct
          bearing on the results of the analysis.
                  The mix of new generating facilities is assumed to be the following:
          75% base load, 20% intermediate load, and 5% peak load capability. Coal and
          nuclear facilities will compete for base load generation capability and for half
          of the intermediate load.  Oil, gas, and hydroelectric facilities will be used
          primarily in intermediate and peak facilities. (Oil will continue to be used in
          decreasing amounts as the base load fuel source.) Load factors for the new

          facilities are assumed to be 65%.

                  Prices of primary fuels for electric power generation were not considered
          in the analysis, but availability and price will play a major role in determining

          the types and numbers of facilities constructed. No assumptions were made as to

          the-substitution of electricity for other energy end use purposes, but such a
          trend would be reflected in.higher rates of demand for electricity. The analysis
          further assumes a standard 1000-MW unit size with the option to locate multiple
          units on a site. Further expansion of present utility sites and reconstruction on
          retired sites were assumed, thereby potentially lowering demand for total land
          requirements by-15-25%. Two nuclear units were assigned to each site with
          potential of up to 4'units per site before additional land would be,required.
          Approximately one-half of the water required for a closed-cycle system is
          consumed. The assumption was made that facility retirements would not substan-
          tially affect the.amount of new capacity to be installed.
                  There are a number of critical points which .greatly.affect the demand
          for electricity which have been ignored in this analysis. Any one of these
          issues could greatly alter the demand for electricity and the capacity needed
          over the next twenty years.,
                  The analysis does not consider the effect of prices on the demand for
          electr icity, a central issue in most projections. No account is taken
<pb n="398" />

                                                     378

               @of the potential slackening in demand as population growth levels off or as
               some saturation level for electricity is approached. Straight extrapolations of
               present generating capacity do not c7onsider-increasing efficiencies over time in
               the generation, transmission or end use of electricity. The present situation
               of high reserve capacities and low load factors,.which may delay need for
               additional capacity (increasing load factors will substantially reduce short-
               term.need to increase capacity), is not addressed. Also not considered is the
               regional or power pool level of demand-analysis which allows for a potential
               reduction in required generating capacity due to better management and-the
               sharing of,power through well-developed transmission networks. This partial
               list of "critical factors not accounted for" suggests the many weaknesses of the
               analysis. The point should be emphasized, however, that the analysis was
               conducted as a demonstration of the magnitude of the resources required, should
               certain capacity expansion schedules be followed, and not as a forecast of
               capacity expansion in the Great Lakes Region.
                       Based on present (1975) generating capacity an&amp;ele ctricity demand (by
               state), future generating capabilities and demand levels have been postulated,
               using the three growth rates (3%, 5.5%, 8%) at time increments of 10 and 20 years.
               Using a simple compounded interest formula, the current electrical power capacity
               .and demand levels were extrapolated at the three growth rates to give an indica-
               tion of future potential resource requirements needed for new energy facilities.
               While both capacity and demand projections were made for analysis-purposes only,
               .electric generating capacity will be used in the assessment of future resource
               requirements.
                       Working through projected required capacity figures provides a graphic
               display of how fast new capacity would be required at various growth rates.
               Given certain assumptions, such as traditional load factors and utility opera-
               ting practices, a number of possible resource requirement schedules for the
               ,different growth rates can be postulated. The purpose of such an exercise is to
               give a rough indication of what future demands for electric power might mean in
               terms of land,. water, and fuel resources required for the new capacity. When
               these resource requirements are combined with the four scenarios, some indica-

               tion of the number and types of facilities may be estimated.
<pb n="399" />

                                                     379

          F. PROJECTED GENERATING     CAPACITY AND RESOURCE REQUIREMENTS

                   On a regional level, using a.standard 1000-MW generating unit, the
          additional projected capacity needed at a 3% growth rate through the year 1995
          would be roughly 126,686 MW. Similarly, for the same time span, the amount of
          capacity needed at growth@    rates of 5.5% and 8% would be 300,.677 MW and 575,642 MW
          respectively. These numbers were determined by taking each state's 1975 genera-
          ting capacity and extrapolating at-the three growth rates over a twenty year
          period. Assuming no present facilities decommission, a rough estimate of the
          number of new 1000-MW generating units (multiple units may be located on one
          site) needed by 1995 would be 126 at a 3% growth rate, 300 at a 5.5% rate, and
          575 at 8%. Due to the nature of the assumptions previously listed these figures

          contain a substantial margin of error..

                                                    TABLE 74
                           NEW GENERATING CAPACITY REQUIREMENTS FOR 1995       (in MW)

                                                 (1975)            Projections (1995)
                State                             Base         3%            5.5%.        8%

                Illinois                         25,500      46,055       74,402        118,854
                   additional capacity                       20,555       48,802         93,354
                Indiana                          13,315      24,048       38,850         62,060
                   additional capacity                       '10,733-     25,535         49,745
                Michigan                         18,926      34,316       55,437         8 8,558
                   additional capacity                       15,390       36,511         69,632
                Minnesota                          6,700     12,100       19,548         31,228
                   additional capacity                        5,400       12,848         24,528
                New York                         29,000      52,377       84,614        135,167
                   additional capacity                       23,377       55,614        106,167
                Ohio                             25,780      46,561       74,943        120,159
                   additional capacity                       20,881       49,163,        94,379
                Pennsylv 'ania                   28,770      51,961       83,943        134,095
                   additional   capacity                     23,191       55,173        105,325
                Wisconsin                         8,881.     16,040       25,912         41,393
                   additional   capacity                      7-,159      17,031         32,512

                Region Total                     156,872    283,556       457,547       732,512
                   total additional capacity                126,686       300,677       575,642
<pb n="400" />

                                                      380

                        The land, water, and fuel resources required for these facilities could
                be determined by using figures available for existing facilities. The result
                represents an.average or ideal facility requirement and is subject to debate.
                        For coal-fired plants, fuel requirem ents are assumed to be 228 tons per
                hour, or approximately 2 million tons of coal per year.. The Btu value of the
                                     6
                coal averages 20 x 10 per ton. For low Btu western coal, the heat value could
                be 15-20% lower. Conversely for a higher Btu coal the heat content could be as
                much as i5-20% higher.
                        Land requirements for. a 1000-MW coal-fired facility are 400 acres per unit.
                This includes the land required for the plant with on-site ash and SOX disposal,
                natural draft cooling towers, and storage for a six-month coal supply. Depending
                on the mix of these variables, total land requirements can vary as much as 100
                acres. Water requirements vary substantially between closed-cycle cooling systems
                and open-cycle or once-through cooling, such that two sets of numbers will be
                postulated to represent each system. The water requirements for a natural draft
                cooling tower are 700,000 gallons per minute (gpm) (assuming a  12*-13'F tempera-
                ture rise across the condenser) for the open-cycle and 10,000 gpm for closed-cycle

                system.
                        Resource requirements for nuclear units vary as greatly as those of a -
                coal-fired station. The fuel requirement for nuclear units has been deleted from
                this analysis due to the unique problems posed by the handling,'transport, and
                processing of nuclear fuels. Land requirements average 1,335 acres per unit
                (135 for the actual facilities, and the additional 1,200 acres as exclusion zone).
                Nuclear facilities, unlike coal facilities, are able to economize by siting
                multiple units on a single site, requiring no additional land for up to 4 units.
                        Nuclear facilities require more water than do coal facilities, averaging
                an additional 15,000 gpm for a closed-cycle system, of,which approximately 50% is
                consumptive use, and up to I million gpm for an-open-cycle  system, with some
                consumption (assuming a 15*F temperature rise across the condenser).
                        These resource requirements are used in conjunction with the four
                scenarios to indicate potential pressures on the Great Lakes Region in the siting
                of new electric generating facilities. With the  major exception of New York,
                the Great Lakes states rely primarily on coal for base load generation, with an
                average of 66%.  The remaining capacity is made up of hydroelectric, 5%
                (expected to provide a decreasing percentage of electric power as suitable sites
                become scarce), oil and gas-fired, 17%, for base and peak supply, and nuclear,
                currently 12% and expected to comprise roughly 35% by 19.90. The question of
<pb n="401" />

                                                                    381,

              oil-fired generating units is somewhat more crucial to New York State, as it
              presently accounts for about'40% of the state's power.

                                                                  TABLE 75
                        1975 FUEL MIX       BY  TYPE FOR POWER GENERATION (Btu percentage by state)

                             State            Oil           Gas            Coal           Hydro            Nuclear

                                              8W
                             Illinois                       4%              63%              .1%              24%
                             Indiana          3%,           2%              93%              U                  0%
                             Michigan        10%            6%              72%              1%               10%

                             Minnesota        3%            12%             63%              2%               19%_

                             New York        39%            5%              15%            2 4%.              17%

                             Ohio             4%            2%              94%                                 0%

                             Penn.           14 /%          1%              74%              1%                 9%
                             Wisconsin        1%            9%              57%              1 Z              2_8%
                                Regional
                                Weighted
                                Averap-e     13%            4%              66%          -5 /%                12%

                        ..The recent trends scenario suggests that                 nuclear generating capability
             ,Will grow to,approximately 35.% of the total generation over the next 15 to 20

              years.
                         Based on     1975 figures, determined by weighted average of t                    he eight Great
              Lakes   states' fuel mix distribution, this works out to approximately 70,000 MW,
              or 70   nuclear units, and 40,000 MW, or 40 new coal units, at the 3% rate by 1995.
              This would bring the nuclear capacity up to 35% of the generating capability for.
              the region with coal.comprising              50%, and oil, gas, and hydroelectric making up
              the remaining 15%, accounting for roughly 18 new units.

                 The method for arriving at these figures involved determining the current
                 generating capabilities by fuel type for the states and weighing them,
                 accounting for differences.in each state's generating capacity, and coming
                 up with an average regional fuel mix. These figures were then used to
                 determine the approximate amount of capacity for each fuel type in the region.
                 Then, with the additional capacity required by the three growth.rates, the
                 number of new units was determined by multiplying the expected capacity
                 percentage for each fuel type by the to\tal capacity in 1995 and subtracting
                 the present capacity.'
<pb n="402" />

                                                      382

                        Land requirements for nuclear facilities in the recent trends scenario
               at a 3%  growth rate are on the order of 46,725 acres for the region. This
               assumes  that two units per site woL require no additional land. 'Additional
               units per site would reduce land requirements further. 'The water require-
               ments for these 70 nuclear facilities, using a closed-cycle cooling system,
               are 1,512 x-106 gallons per day (gpd), while for a once-through.cooling system,
               1,008 x 108 gpd would be needed. Similarly for the coal-fired uni     Its, land
               requirements total 16,000 acres and fuel consumption would equal 80 x 106 tons
               per year. Once-through cooling water equals some 403 x 108 gpd, and a closed-
                                                         6
               cycle system would utilize   some 576 x 10 gpd. As is evident, even at a low
               growth rate the number of new 1,000-MWe units required by 1995 is substantial
               an(i indicates the need for rational long-term planning.

                        The amount of new capacity required at a 5.5% growth rate would be
               141,000 MWe. or 141 nuclear units and.121,000 MWe, or 121 units, for coal-
               fired generation. Oil, gas, and hydroelectric might contribute up to an
               additional 35,000 MWe.
                        Nuclear facilities would require 93,120 acres of land, 3,046 x 10    6 gpd
               of water for a closed-cycle system, and 2,030 x 10    8gpd for a once--through
               cooling system. The coal-fired facilities would require 48,400 acres of land,
               242 million tons of coal  -per year, 1,220 x 10@ gpd for a once-through cooling
                                      6
               system, and 1,742 x 10 gpd for a closed-cycle cooling system.

                                                    Table 76

                             ADDITIONAL FACILITIES REQUIRED BETWEEN 1975-1995 FOR
                                           SCENARIO I, RECENT TRENDS

                                                                   Growth Rates
               Type                                   3%               5.5%               8%

               Nuclear (units)                        70               141                238
                 land requirements (acres)          46,725           94,120             158,865
                 water requirements (gpd):                 8                  8              - 8
                    once-through                 1,008 x 106       2,030 x 10 6       2,427 x 106
                    closed-cycle                 1,512 x 10        3,046 x 10         5,141 x 10
               Coal (units)                           40               121                185
                 land requirements (acres)          16,000           48,400 -            74,000
                 fuel requirements
                    (millions of tons/year)           80               242                370
                 water requirements (gpd):                 8                  8                 8
                    once-through                   403 x 106       1,220 x 10 6       1,865 x 106
                    closed-cycle                   576 x 10        1,742 x 10         2,664 x 10
<pb n="403" />

                                                      383

                    At a growth rate of 8%, approximately 238,000 MW, or 238 nuclear units,
           would be required and 185,000 MW, or 185 units, for coal-fired generation. The
           nuclear. units would need 158,865 acres of land, 5,141 x 10.    6  gpd of water for a
                                                           8
           closed-cycle cooling system, and 3,427 x 10 gpd for-a once-through system. The
           coal units would require 74,000 acres of land, 370 million tons of coal,
                      6                                                                       8
           2,664 x 10   ,gpd of. water@ for a closed-cycle cooling system, and 1, 865 x 10       gpd
           for a once-through system.
                    The second scenario postulates a fuel mix,for the year 1975 comprised of
           70% coal, 15% nuclear, and 15% oil,and gas. At the 3% growth rate the number.of
           new facilities required by this scenario will be approximately 96 coal units
           (1,000 MW each), 24 nuclear units, and about 20 oil or hydroelectric units. The
           resource requirements for these facilities are shown in Table 77.,

                                                   Table 77

                         ADDITIONAL FACILITIES REQUIRED BETWEEN 1975-1995 FOR
                                     SCENARIO II, HIGH COAL ELECTRIC

                                                                   Growth Rates
           Type                                      3%                 5.5%                 8%
           Nuclear (units)'                          24                  50                  92
             land re quirements (acres            16,020              33,380              61,410
             water requirements (gpd):
                once-through                     346 x 10 8         720 x 10 8         1,325 x 10   8
                closed--cycle                    518,x 10 6       1,080 x 10 6         l,'987 x 10  6
           Coal (units)                              96                 217                 410
             land requirements (acres)            38,400              86,800             164,000
             fuel requirements
                (millions of tons/year)              192                434                 820
             water requirements (gpd):                    8                  8                      8
                once-through                      968 k  106      2,187 x  106         4,133 x 10   6
                closed-cycle                    1,382 x  10       3,125 x  10          5,904 x 10

                    The third  scenario  assumes that  nuclear generating capability will equal
           that of  coal-fired generation. The fuel     mix breakdown for this scenario is
           approximately: 45%    nuclear, 45% coal, and'10% oil.
                    The fourth   scenario postulates a  rapid development of new technologies,
           hence, a somewhat reduced dependence on more conventional generation.technologies.
           It suggests a fuel mix having the same proportions between fuel types as that of
           recent trends, but with a reduction of 20-25% in the number of new coal and
           nuclear  facilities required. Given this similarity, the resource requirements
           for the  new technologies scenario are assumed to be 70-80% of those postulated

           for the  recent trends scenario.
<pb n="404" />

                                                        384

                                                    Table 78

                             ADDITIONAL FACILITIES  REQUIRED BETWEEN 1975-1995 FOR
                                            SCENARIO III, HIGH NUCLEAR

                                                                    Growth Rate's
               Type                                    3%'             5.5%               8%
               Nuclear (units)                        104               177               311
                 land requirements (acres)         60,420            118,150            207,590
                 water requirements (gpd):                  8                  8                  8
                    once-through                 1,498 x 10 6       2,549 x 10 6      4,478 x 10  6
                    closed-cycle                 2,246 x  10        3,823 x 10        6,718 x 10
               Coal (units)                            12                91               227
                 land requirements (acres)          4,800             36,400             90,800
                 fuel requirements
                    (millions of tons/year)            24               182               454
                 water requirements (gpd):                  8                 8                   8
                    once-through                   121 x  106        917 x  106       2,288 x 10  8
                    closed-cycle                   173 x  10       1,310 x  10        3,269 x 10

               G. COASTAL ZONE RESOURCE IMPACT ANALYSIS

                    1. RELATION OF PROJECTED DEMAND TO POWER PLANTS

                       The implications of these figures vary greatly from county to county in
               the Great Lakes coastal zone. The limitations of the analysis notwithstanding,
               the potential impact of energy facility siting can be estimated by assessing the
               current importance to the states of coastal county energy facilities and then
               assuming that this current proportion will hold constant in the future.
                       For the States of Illinois, Pennsylvania, and possibly Indiana, the
               future of their coastal counties with respect to energy    facilities will most
               probably be limited to demands for access to the water rather than the physical
               siting of facilities on or near the shoreline. This aspect of coastal,zone
               utilization is further limited by the difficulty of siting new generating units
               in the.already heavily developed Indiana and Illinois counties. Pennsylvania's
               coastal county, being somewhat less developed, has a slightly higher potential
               for access. It may turn out, however, that as an increasing number of facilities
               require water supplies no longer obtainable from inland sites, there will be
               increased pressure to transport coastal waters further inland.
                       Minnesota currently has the lowest number of energy facilities in the
               coastal zone. The current percentage of coastal zone generating facilities of
               the state total is roughly 5%. Further, there are no plans at present to
               construct any facilities. If land presently categorized as agricultural or
<pb n="405" />

                                                 385

          undeveloped were considered potentially available for the siting of energy
          facilities, Minnesota would have 11 mile's of coast land available for energy

          facilities.

                  By taking the total new generating capacity required by the four
          scenarios and determining Minnesota's portion based on the percentage of
          current capacity, a tough idea of the number of new Minnesota facilities   required
          could be derived. (This procedure will be followed for the remaining states.,)
          Minnesota's share of the postulated new-facilities would range from 6 plants at
          a 3% growth rate to 23 facilities at an 8% rate. Maintaining 5% of its total
          capacity in the coastal counties, only one or two new coastal facilities would be
          required. These facilities would take approximately 1000     2000 acres of land,
          with the water and fuel resources presenting little additional burden to the
          coastal zone. Assuming a pressure to site an increasing percentage of the state's
          tot al generating capacity in the coastal zone, the number of new facilities there
          may rise to five or six.
                  Following the same procedure, the pressure on the coastal counties in
          Wisconsin is seen to be substantially greater than that in Minnesota. Currently
          59% of Wisconsin's generating capacity is located in coastal counties. With
          8,881 MWe, Wisconsin comprises 6% of the Great Lakes Region's total generating
          capacity. Based on these figures, the potential number of new facilities required
          in the Wisconsin coastal counties ranges from 8 at a 3% growth rate to 20 at 8%.
          The resources required for these new facilities will*vary depending upon the
          scenario. Assuming equal development of both nuclear and coal facilities the
          requirements in the coastal counties might be the following: land requirements--
          from 5,870 acres for 8 facilities to 10@,675 acres for twenty; water requirements--
          for a closed-cycle cooling system from 100,000. gpm to 250,000 gpm, and for an
          open-cycle cooling system between 6.8 x 10 6 gpm to 17 x 106 gpm. With one-half
          of the new facilities being coal"fired the fuel requirement would range from
          8 million tons/year to 20 million tons/year.
                  Ohio's current generating capacity is approximately 25,225 MWe of which
          21% is located in coastal counties. Under the regional projections, Ohio's
          coastal counties would need to accommodate 4 new generating units at the 3% growth
          rate and 19 at the 8% level. Again, assuming equal numbers of both coal and
          nuclear facilities the resource requirements would be within the following range:
          land--from 2,135 acres for 4 units to 10,140 acres for 19 units; water--for closed-
          cycle systems between 50,000 gpm and 237,500 gpm, and for open-cycle systems,
<pb n="406" />

                                                       386

                                                         6                    6
              requirements would fall between 3.4 x1o gpm and 16.15 x       10. gpm. The fuel
              requirements for the coal-fired facilities vary between 4     million tons/year and
              19 million tons/year.
                       New York's generating capacity is currently 29,000    MWe of which 27% is

              in coastal counties. The number@of new facilities in the      coastal counties would
              range from 7 plants at a 3% growth rate to 29 at the 8% rate. With these numbers
              of potential new coastal zone facilities the additional pressure on the coastal
              zone would be significant. The resources required for these new facilities break
              down as follows: land--from 3,740 acres to 15,480 acres for 29 new units; water--
              from 87,500 gpm for 7 units closed-cycle cooling to 362,500 gpm for 29 units.
              For open-cycle cooling these numbers range from 5.95 x 10    6  gpm to 2'4.65 x 106 gpm_
              Coal requirements would fall between 7 million tons/year for the 3% growth pro-
              je,ction to 29 million tons/year for the high growth rate.
                       The State af Michigan has the highest percentage (731%) of its generating
              capacity (18,926 MWe) located in coastal counties. Michigan's coastal counties'
              share of the projected new capacity would be 11 units at a 3% growth rate and 51
              units at the 8% level. The requirements on Michigan's coastal counties break
              down as follows: land--between 5,870 acres and 27,220.acres; water--in a closed-
              cycle-cooling system between 137,500 gpm and 637,500 gpm, and for the open-cycle
                                 5      6                    6
              system between 9.3 x 10 gpm and 43.35 x 10 gpm. The coal requirements,
              assuming an approximate 50% coal fuel mix for projected base load generation,
              would range between 11 million tons/year and 51 million tons/year.
                       The,number of postulated new facilities in the coastal counties associated
              with the 3% growth rate might be assumed to accurately represent the minimum over
              the next twenty years. This is supported by the following: (1) "best guess"
              estimates for growth in energy demand hover around 5).5%, hence a 3% growth rate
              might reduce the errors in many of theassumptions made in the analysis, (2) the
              thermal.loading of inland waters will increase the pressure on the Great Lakes
              for cooling purposes' (a good example of which might be the Ohio River system),,
              and (3) the proportion of generating capacity currently located in the coastal
              zone (or utilizing.land and water resources) may rise in the future rather than
              remain constant. At this time, it should be apparent.that the demand for
              electricity over the next twenty years will be a major factor controlling
              pressures on the Great Lakes coastal zone with respect to energy facility siting.
<pb n="407" />

                                                 387

              2. RELATION OF PROJECTED ELECTRICAL AND FUEL DEMANDS TO FUEL TRANSSHIPMENT
                  AND STORAGE

                  The future demands for electrical energy production  interact with the
          expansion and development of fuel transshipment and storage  facilities in a
          complex and diverse manner. The discussion of this topic will center    primarily
          on the effects coal movements mayhave on the future of these facilities.
                  Oil, presently contributing a smaller percentage of the region's fuel
          mix, is expected to have a minor impact on the future development of ports and
          terminals. It was felt that the   facilities were adequately developed to handle
          liquid fuels and that competition from pipelines and rail movement would, in the
          future, further reduce the@relative percentage of this fuel moved on the lakes.
          Additionally, the questionable role of  oil in the future generation of base load'
          power was taken into account.
                  Coal, which is expected to contribute to the major fossil fuel demands
          for power generation in the region, will continue to depend heavily oft movement
          through transshipment facilities.
                  Assessing the adequacy of  these facilities1s complicated by a number of
          intrinsic and external variables.  In previous sections of this  report the
          capacity of ports and terminals was analyzed from a historical perspective. In
          examination of the prior ten-year period it was determined that the system could
          presently double the coal tonnage moved on the Great Lakes. This would invo.1ve
          additional shipments of approximately forty million tons. -The assessment, how-
          ever, does not specify the quality or origin of the coal transported. @Under
          this evaluation, higher sulfur eastern and midwestern coal would contribute
          heavily to the total shipments through the facilities on Lakes Erie and Michigan.
          The,relative percentage of eastern versus low sulfur western coal moved on the
          Great Lakes is crucial in any assessment of future impacts of coal on ports and
          terminals. This eastern/western mix is largely dependent on the@development of
          low-cost technologies of sulfur removal either before or after combustion.
                  The competition between rail and lake vessel movement is also central to
          an examination of future demands on ports and terminals. In 1975, 4.4% of the
          coal used in the eight Great Lakes states for electric power generation was moved
          on the Great Lakes [604]. Fluctuations in this relative percentage will
          naturally affect the impact that coal shipments on the Great Lakes will have on
          transshipment facilities.
<pb n="408" />

                                                     388

                     @The pre ious section developed a number-of-scenarios based on the future
                             v

              fuel mix:for electric power generation. An examination,of the scenario,projecting
             .a high coal fuel mix is most relevant to the future coal movement'on the Great
              Lakes.:,A--general discussion of impacts.on ports and terminals can be developed
              through examination of this scenario. Analysis of projected activities:at
              particular ports on the lakes is not feasible and would be highly speculative,
              conside ring the vagaries of'future compIetition from other modes,of transport,and
              the relative utilization of-high or low,sulfur coal. It is possible,. however, to
              analyze the.overall implications of such a high coal scenario on transshipment

              facilities.

                      Taking the 8% growth rate developed in the high coal scenario for
              electric generation as an upper bound, the fuel requirements are projected as an
              additional 820 million tons of coal for the eight Great Lakes states. Assuming
              Lake traffic contributes 4.4% to the total movement of coal for electric power
              generation, waterborne coal movement,would increase by 36 million tons.' It must
                          that this figure is the product of extended extrapolations and as such
              becomes increasingly removed from the eventual realities of coal. transshipment..
              Based on a relative fuel mix at a given growth,rate,' assuming an average heat
              value of.coal and a relative percentage of 1ake movement, the figure of an
              additional 36 million tons by 1995 for utility;use on the lakes,should be viewed
              with guarded skepticism. This tonnage figure will be used strictly,as representa-
              tive of a substantial increase in coal traffic on.the Great Lakes and may rise to
              higher levels if shipping takes a larger share of the total transport market of

              coal to electric utilities.

                      The impact of this additional tonnage demand on transshipment.facilities
              can be discussed on a regional level varying the coal origin (eastern versus
              western) as it relates to the geographically specific,locations of transshipment.
              If one assumes that utilities, in.an effort to comply with air quality regulations
              and in the absence of efficient sulfur removal techniques, purchase western low
              sulfur coal, then the pattern and movement of Lake traffic of coal will shift
              substantially. A considerable increase in western coal utilization of the
              magnitude previously described would place enormous stress on the facilities
              presently in use. This is compounded by the fact that generally western coal has
              a lower heating value than coal from eastern mines, necessitating even greater
              volume throughout. Facilities at Superior, Wisconsin and perhaps Chicago would
              handle much of the additional load. However,'with the cost advantages inshipping
<pb n="409" />

                                                 389

           over long distances one would expect that additional facilities would be requi.red
           and expansion of.present coal handling ports would occur. It is difficult to
           project the location of the additional facilities on a site-specific basis, but
           relative to cost reduction in delivered price one wo uld assume a maximation of
           the direct waterborne portion of transportation, encouraging further developments
           on the western end of Lake Superior.
                   The high coal scenario hinges primarily on the absence of efficient'low-
           cost sulfur technologies,. With such development the pressures on transshipment
           facilities may return to the ports of the lower.Lakes and specifically to the
           facilities on Lake Erie. The long-established and highly developed ports of this
           region would require less overall new development and expansion than would be
           expected for increases in western coal use. The upbound movement from these
           ports would facilitate the continuation of the traditionally economically
           beneficial iron ore/coal interchange at the Lake Erie ports.
                  Either extreme of strictly western versus eastern coal is unrealistic.
           In this discussion the pressures on the transshipment facilities are examined from
          .a perspective of the relative emphasis of coal origins. Utilities commonly
           blend coal of varying sulfur contents to achieve a mix that will meet air quality
           standards. Future demands on the movement of coal through transshipment facili-
           ties are largely a function of what thefuture mix will be as related to the
           economies and technologies of coal-fired generation and emissions control-.
<pb n="410" />

                                                391

                                             Chapter VI

                      POLICY OPTIONS RELATED TO THE SITING OF ENERGY FACILITIES
                                   IN THE GREAT LAKES COASTAL ZONE

          A. INTRODUCTION

                  The principal objective of this study is the development of a full range
          of policy options for the siting of energy facilities in the Great Lakes coastal
          zone. Institutional arrangements and technical-environmental-economic appro aches
          are emphasized in the options. The institutional options cover options for:
          (1) siting policy, (2) organizational arrangements, (3) functional responsibili-
          ties, (4) siting procedures, (5) siting criteria and standards, (6) financial
          mechanisms, and (7) intergovernmental relations. The technical options.include
          options for: (1) the exclusion of all new facility development from the coastal
          zone management area including access to coastal waters and related fuel trans-
          shipment; (2) exclusion of all new facility development from the coastal zone
          management area, but allowing coastal water access, re lated fuel transportation
          and product transmission through the coastal zone; and (3) inclusion of new
          facility development in the coastal zone management area except in designated
          sensitive areas in which additional development would be precluded.
                 These options are only suggestive. No recommendations are made that a
          state or program should adopt any of the options proposed. The situation ineach
          state will dictate the kinds of options it might employ in planning for and
          managing the effects of energy facilities sited in or near the coastal zone.
          Some of the options would entail major reorganization of institutions or revi-
          sion of siting criteria, regulations and standards. Other options suggest use..
          of existing institutional arrangements or augmenting present siting criteria and
          regulation.
<pb n="411" />

                                                   392

                      Selection of,certain options will preclude choosing other options.
              However, selection of combinations of options within and among the categories
              mentioned above are essentially unrestricted.
                      This listing of options is comprehensive, but is not intended to be
              exhaustive. The agencies affected will probably identify additional options and
              develop the details of these options as they relate to their respective programs.
                      The energy growth rates used in this study (in Chapter V) do not affect
              which options might be chosen, but they do serve to suggestt how much emphasis
              a particular state might place on developing an energy facility siting program;
              how comprehensive that program might be in terms of facilities and fuels; what
              the areal extent of the program jurisdiction should be; which levels of govern-
              ment should be involved with the program; what involvement the state.coastal
              zone management program might have in such a program; and what authorities and
              sanctions should be vested in the program.
<pb n="412" />

                                                  393

           B. INSTITUTIONAL OPTIONS

               1. INTRODUCTION

                   Options discussed in this section were derived from the study   of exist-
           ing state programs for the siting of energy facilities and of various    proposals
           for improving such programs. Where an option can be identified with    a particu-

          ,lar state program, the state is indicated by its two-letter postal service
           abbreviation in parentheses. In this manner, the interested reader    is directed
           to the appropriate st.ate program description or to the state itself  for addi-

           tional information.

               The options discussed in this section range from general  approaches to  more
           specific procedures and,criteria that may be employed in the   regulation of
           energy facility siting. The seven categories are: Siting.Policy, Organizational
           Structure and Arrangements, Functional Responsibilities, Siting Procedures,
           Siting Criteria and Standards, Financial Mechanisms, and Intergovernmental

           Relations.

               2. SITING POLICY
                   Energy facility siting is closely related to numerous traditional
           functions of state government. In establishing policies to    regulate,energy
           facility siting, a state may choose to specify the relationship of the siting
           program to one or more of these functions, thereby imposing a philosophy of
           operation on the siting process. Several of these relationships and their
           possible impacts are described below. The lack of any such relationship would
           imply that utilities and other energy producers/distributers have almost com-
           plete freedom in site selection.

                   a. Traditional Utility Regulation
                   This approach represents the status quo in most states that have not re-
           cently enacted energy facility siting legislation. Traditional utility regulation
           has received criticism for avariety of reasons, including: failure to consider
          .al1aspects of the siting issue; lack of earl  y public participation; the multi-
           plicity of independent local and state agencies with responsibility over some
           phase of siting; and the delays that result from this process. However, these.
           11problems" do not seem to be inherent features of traditional utility regula-
           tion. The process may be improved by means of interagency agreements or orders
<pb n="413" />

                                                         394

               of the Governor, while maintaining the basic.system of-responsibilities.
                        ILn2lications.   Possible consequences of this arrangement      include  subordi-
               nation of environmental considerations and the inability to address the broader
               issues of energy pol  icy and land use. Without a legislative mandate it may not
               be possible to assure that the criticisms.listed in the above paragraph are
                       with adequately. Utility regulatory commissions are'traditionally con-
               cerned.primarily with economic matters affecting.service charges and return on
               utility investment and the.safety and engineering,,aspects of facilities. The
               resolution of conflicts over economic and environmental issues, which are com-
               mon in energy facility siting, may requireexpanding,the regulatory commission
             ".to include members with appropriate backgrounds.

                        b. Energy Policy
                        The siting function may be.handled in the broad       context.of.state energy
               policy.   The emphasis would be on regulation/allocation      of  fuels to assure
               adequate  supplies of each type for essential or best      purposes, and also to
               assure adequate supplies of electricity. The program may include methods of
               ,limiting electricity demand and conserving energy,in all forms..
                        Implications.- Projections.of (electrical) energy demand indicate         an esca-
               @ating demand for sites. The siting.function would be simplified if          the  demand
               for sites could be reduced by means of an.aggressive state energy conservation
               program. Thus, the option of foregoing sites is.contingent,uponl.reducing

               demand.
                        Another aspect   of energy policy, the interchangability offuels to provide
               energy,  is also closely related to siting questions. For example, the fuel
               type of  a power plant has definite environmental implications that affect the
               suitability of a site, while the choice o,f,lfuel     type must be made in light of
               state or  national requirements for alternative uses      and for environmental pro-
               tection. Extraneous factors that affect siting decisions,might include the
               environmental degradation accompanying the strip      mining of. coal,,the scarcity
               of natural gas and its requirement for other, industrial, and domestic purposes.
               the precarious situation entailed by dependence      onjoreign supplies of oil, and
               the problems associated with the reprocessing and.disposal of nuclear wastes.
               Combining the responsibilities for siting regulation-and energy policy in one
               agency would facilitate these decisions.       Lack of.a.cohere.nt national
               energy policy also affects local and regional facility siting regulation by not
<pb n="414" />

                                                  395

           providing adequate direction for future fuel use, and thus the types'of plants

           that should be constructe&amp;

                   c. Land Use Policies

                   This option would treat all major construction projects, including     energy
           facilities, as significant impac.ts requiring state approval. The emphasis      would
           be on patterns of land development and-regional   economic and environmental
           impacts. A corollary to this option would be to limit land use control1juris-
           diction to the coastal zone. Such.an approach would recognize the unique and
           valuable aspects of coastal lands and the heavy development pressures they are
           subject to. Whatever energy facility siting process applied to the remainder of
           the state would necessarily be closely coordinated with the coastalzone manage-'

           ment function.

                   Implications. For the state to assume land use control requires the
           retaking of authority that has traditionally been relegated to local units of
           government. This may not be a popular approach, and heavy restrictions on the
           size and type of facility or project or-the geographic area that would be sub-
           jected to state control may be required.- It may be appropriate to recognize the
           regional nature of many large facilities, including power plants and o    .ther
           energy facilities, and provide for state control of their siting. Restricting
           control to the coastal zone would recognize the critical importance of this
           region and would satisfy the requirements of Section 306(e)(1) of the Coastal
           Zone Management Act. Less direct state land use control in the coastal zone is

           also an option under the Act.

                   d. Pollution Control/Environmental Protection
                   This option would place emphasis on pollution standards and the relevant
           technology to. assure protection of air, land and water resources. Siting con-
           trol would probably  reside with the  state's environmental protection agency.
           Critical or fragile  areas would be heavily protected.
                   Implications. Environmental protection*is a,primary concern in energy
           facility siting. Historically, utility regulation commissions have placed more
           emphasis on adequate provision of energy than on environmental issues associated
          -with energy production. In many states the environmental protection agency
           already has major responsibilities for,issuing permits and certifying the
           environmental compatibility of facilities. It would generally be only a small
<pb n="415" />

                                                    396

              step to enable suchagencies to haveoverall.authority     for site certification.
              However, it may be difficult to obtain unbiased decisions from an agency with an
              historic emphasis in one direction.

                      e. Scope of Facility Siting Regulation
                      Two basin options exist for the types of energy facilities subject to
              state regulation, though the intervening ground is a continuum between the two.
              One one hand, regulation may apply-to all energy facilities: power plants,
              transmission lines, pipelines (gas and oil), refineries, transfer and  I storage
              facilities, and coal gasification and liquefaction facilities, and perhaps large
              scale solar collectors, etc. On the other hand, regulation may be limited to
              facilities constructed by regulated monopoly utilities (i.e., gas and electric
              companies). This approach might even limit itself to power plants and trans-
              mission lines, in light of their high public visibility and the need to balance
              the demand for electricity with the protection of the enVironment and economic

              issues..
                      lalications. The scope of facility siting regulation may depend on the
              ov erall responsibility or emphasis of the primary siting agency. If the state
              has a program to deal with energy policy, it may be feasible to regulate a broad
              range-of facilities, whereas maintenance of the traditional system of utility
              regulation with a slightly broader scope to address siting is  sues might dictate
              a limiting of the regulatory process to utility-owned facilities.

                      f. State Power Authority
                      A state may elect to compete  with or supersede public  utilities in the
              matter of construction of base load power plants. A state power authority could
              construct and operate power plants and sell power at'.cost to utilities for ulti-
              mate distribution to customers. The power authority would have primary respon-
              sibility for selecting facility sites that are compatible with all aspects of

              environmental and economic concerns.

                      Implications. Recent economic developments affecting interest rates,
              construction costs and fuel  costs have raised doubts concerning the ability of
              investor-owned, privately managed utilities to meet the future demand for elec-
              tric power. I Numerous power  plant plans have been. delayed or cancelled. Imple-
              mentation of the state power  authority concept would be a response to percep-
              tions of the present or potential severity of this,situation. The state
<pb n="416" />

                                                    397

           authority would be able to borrow money at lowerrates through       the  is6uance'of
           tax-exempt bonds and  would not be required to pay stock dividends.
                   The critical  question in establishmentof a 'State energy authority       is:
           Who may best serve the public in the production of electrical energy; the pri-
           vate sector or the public sector?, The private sector may argue that they have
           traditionally served the public well, that the profit motive guarantees con-
           tinued high quality service, and that the current'regulatory process       is a major
           source of difficulty.    An evaluation of the relative merits of each-side -of the
           question is beyond the   scope of'this  -report. Intereg ted persofis'might obtain
           the Brickley Commission   Report, Gove-knor's'Adviso-ry Commisslon-on Electric'Pou'Ter
           Alternatives, State of   Michigan, August 1976.

               3. ORGANIZATIONAL STRUCTURE AND ARRANGEMENTS

                   Within any of the general policy mechanisms     discussed in   the previous
           section, a variety of agency structures are possible for      the regulation of'
           energy facility siting. A state may elect to forego establishment of formal
           siting procedures, in essence leaving siting regulation in the hands of local
           zoning authorities.' Howeveri compliance with the Coastal Zone Management Act
           requires, at the least, that states establish criteria and standards       to'guide
           local authorities in establishing zoning    Irestrittions-in the coastal   zone,  sub-
           ject to state review and enforcement of compliance.'
                   The organizational arrangements,discussed below ate intended to apply       to
           an agency or formal program for the regulation of energy facility      siting. Sub-
           Sequent institutional options   will not necessarily   require the establishment   of
           a siting agency.

                   a. Multi-stop    Process
                   This option requires   review and  approval by each agency with an    interest
           in the various aspects'of energy facility siting And is the process      that  has
           evolved in many states (IL, IN, MI, PA). The Public utilities       commission, Air
           and Water pollution control agencies,'local zoning boards And perhaps several
           other state and local agencies would all be    involved  in the siting   pIrocess.
           Within this framework, it is possible.to establi-sh a    coordination  mechanism
           that provides for the timely Siting of facilities and minimum duplication
           through a unified application procedure and'condur-tent hear ngs.
                   Implications. This option takes advantage of existing expertise within
<pb n="417" />

                                                     398

               various state agencies and does not unnecessarily tie up a permanent staff for
               infrequent siting work. However, even with provisions for coordination,.the
               process will lack the ability to resolve conflicts among competing interests
               in the siting process, since no single body has such authority.' The lack of
               public participation at the decision-making levels may adversely affect the
               credibility and responsiveness of the agency.

                       b. Consolidation of Authority
                       Again using existing agencies, but shifting primary responsibility to
               one or two agencies (WI), this option facilitates the siting process by stream-
               lining it and providing for consideration of conflicting interests by a single
               agency. (Even where two agencies share responsibility, each would consider
               several opposing issues.) Primary candidates for this arrangement would be the
               public utility commission and the environmental protection agency. Local
               authority would be preempted.
                       Implications. A shift in responsibilities of this magnit ude would prob-
               ably require legislative action. The public utility c ommission would be in-
               volved only with regard to regulated utilities, so that in a program encompas-
               sing an extensive range of energy facilities it would be more appropriate to
               place major responsibility for site approval in an environmental protection
               agency, perhaps acting through a siting council within the agency. Certifica-
               tion of facilities constructed by regulated utilities would still be under the
               purview of the public utility commission.

                       C. Siting Agency Composed of Heads of State Agencies
                       The principal siting agency would be composed of the heads (or their
               designees) of the state agencies whose missions relate to or are affected by the
               siting of energy facilities (MD, WA' OR). T his could include representation of
               the department of natural resources (DNR), the state environmental protection
               agency (if separate from the DNR), the public utility commission, the department
               of economic development or commerce, the department of public health, the depart-
               ment of transportation and possibly others. It would also be possible to in-
               clude a representative of the state coastal zone management program on this coun-
               cil. The council would meet several times during the site approval process and
               engage existing agency staffs for requisite research and information functions,
               The chairman of such a council'@@ould be the head of the state agency in which
<pb n="418" />

                                                 399

          the state CZM program is situated. If organizational    arrangements would pre-
          clude this, then the chairmanship could be shifted to   the.head of the state
          agency which has responsibility fof the state CZM program when the proposed
          facility affects the coastal zone.
                  Implications. This approach would insure direct involvement in the
          siting decision process of the concerns,and interests represented by.the prin-
          cipal state agencies and draw on the varied expertise of the agency heads.
          It would also permit efficient transfer of information between supporting staff
          and siting agency members by using the existing lines of intra- and inter-agency
          communications, or by minor modifications thereof. The administrators are
          familiar with the details of their respective-policies, programs, and legal
          authorities and.are well equipped to evaluate siting proposals in terms of these
          factors. Adequate consider  ation of coastal zone policies could be achieved if
          the CZM program were represented directly or if the DNR representatives were to
          represent coastal zone interests as part of overall DNR concerns.
                  This option does not provide for direct public participation in siting
          decisions. It would be necessary to provide extensive opportunities for public
          access to information and for the expression of public opinion. Insurance of
          adequate consideration of a wide range of the problems and needs associated with.
          energy facility siting would be dependent on the.comprehensiveness of the agency
          programs and the structure of the overall energy facility siting program.

                 @d. Public Members

                  A siting council may be  composed entirely of public members or only
          partially so. Public members would most   likely be appointed by the Governor,
          possibly with state senate approval. The   backgrounds.of members may be speci-
          fied in order to insure a wide range of expertise or.experience in applicable
          fields. It may be desirable to restrict the past and future employment of
          council members by those regulated (potential applicants).
                  implications. Direct public involvement enhances credibility with    public
          members either representing the broad public interest or with a balance of   biases
          (backgrounds) specified by law. Specification of backgrounds helps assure    a wide
          range of expertise. Employment restrictions further enhance credibility and may

          be applied to nonpublic council members as well.
                 'Including public members on a council of state agency heads (MN) would
<pb n="419" />

                                                    400

              enhance credibility while taking advantage of existing exertise in matters
              related to siting.

                      e. Hearings Examiners
                      Various proposals exist for establishing a siting council based on the
              legal system. The council members would have both legal and technical back-
              grounds and would act as hearings examiners. The various interests involved
              would'all be represented and the case would be decided on the merits of the

              arguments.
                      -Implications. The court system is currently used as a last resort in
              the adjudication of siting issues. Relegating siting responsibility to hearings
              examiners may reflect an increasing difficulty in reaching decisions under an-
              other system and a desire to obviate court action. This may be an effective
              means for rational decision making on siting issues, relying on the professional
              integrity of the small (three to five member) board of hearings Iexaminers.

                      f. Independent Staff
                      Within the structure of an energy facility siting council such as c.,
              d., or e.. above, there may be established an independent staff to collect and
              analyze data on energy demand and other matters, to conduct environmental stud-
              ies on proposed sites, and to provide whatever other information the council

              requests.
                      Implications. The requirement for an independent staff may be predicated
              on the.amount of work to be done (number of facilities to be sited) which may
              depend on the range of facilities addressed. There are probably sufficient num-
              bers of power plants projected for each of the Great takes states to warrant an
              independent staff. The staff would help   determine the need for energy facili-
              ties and could establish itself as a source of expert information on all aspects
              of energy facility siting.

                      9. Ad Hoc Member(s)
                      This option entails ad hoc representation on the siting council by a
              citizen of the region being considered as a possible site. Appointment may be
              by the legislative body (municipal or county) with jurisdiction over the pro-
              posed site, and the representative may or may not be a member of such body.

              Service on the council would be for the duration of deliberations on that site.
<pb n="420" />

                                               401

                 Implications. This option promotes credibility by assuring that the
         views of the affected community are expressed and considered in the siting
         process. But if the application process requires consideration of alternative
         sites, there may be two or three (competing) representatives of the several

         candidate communities on the council.

             4. FUNCTIONAL RESPONSIBILITIES

                 Several functions are associated with the regulation of energy facility
         siting. Of the functions listed in this section, not all would necessarily be
         performed in each state. Those which are performed may come under the purview of
         any of several organizational entities, including federal, interstate, state,
         intrastate, and local governments; the private (corporate) sector; and the
         general public. Within each of these categories, consideration is limited to
         the agencies that have been established with authority to undertake such respon-
         sibilities. The discussion of each function will attempt-to identify those en-
         tities most likely to assume responsibility for that function and the possible
         consequences of such delegation of authority.

                a. 'Long Range Planning
                Utilities and other potential constructors of energy facilities engage
         in long range,planning, but such plans are often proprietary, leading'to a "plan-
         disclose-defend" paradigm of energy facility siting. Long range planning, in-
         cluding demand-projections and evaluation of alternative prospective sites, is
         an essential part of the overall siting process. If a state finds a need to
         regulate energy facility siting, one of the first steps is to'regulate the pre-
         paration,and-disclosure of long range plans. so that a comprehensive view of
         expected-future development may be obtained. The desirability of such a future
         may then be,evaluated and siting decisions made in terms of their impacts on the

         future.

                    -(1) Long Range Energy Planning and,Forecasting Performed by Private
                         Sector Without State Intervention

                Under this option, determination of long range energy demands and
         forecasts and evaluation of potential sites would be the function of the power
         industry. Plan disclosure would not be required, and the corporate sector
         would operate under its own guidance.
<pb n="421" />

                                                      402

                       Implications. This option recognizes the technical expertise and
               monetary and personnel resources available to  the private sector to invest in
               long range energy planning. If a state chooses not to engage in its own inde-
               pendent planning and forecasting, this approach assumes that the factors con-
               sidered and the assumptions employed by the private sector adequately reflect
               the problems and needs of the general public. Preliminary evaluation and
               selection of prospective sites would.be  based primarily on economic criteria
               and on compliance with existing federal  and state environmental protection
               laws. There would be no assurance that   there would be adequate consideration
               of the full range of problems and needs  expressed by the general public. Since
               public disclosure of plans and forecasts would not be required under this
               option, public accountability of energy facility siting decisions would be very

               limited.

                            (2) Independent Long Range Planning and Forecasting Performed by
                                the State

                       Independent long range planning and forecasting conducted by the state
               could be concerned with projections and trends of future energy-tise, and with
               future site andfacility requirements.
                       Implications. There are some advantages associated with state indepen-
               dent energy site planning and forecasti Ing. First of all, the state is able to
               maintain a better overview of the total energy picture in  the state. Factors
               affecting the various sectors of energy development,and consumption could be
               evaluated in a comprehensive, coordinated manner, and the relationships between
               these sectors could be determined. This would facilitate the development of a
               unified, integrated, statewide energy policy and would serve as a sound basis
               for future siting decisions. One fundamental implication of this option is the
               underlying assumption that sufficient legal authority exists to provide for com-
               pliance with these plans by the private sector. If this were not the case,
               there would be no means by which to tie future siting decisions into such plans
               and forecasts.- The lack of such adequate authority would limit the value of
               independent plans and forecasts to merely identifying the differences between
               the long range goals and objectives of the private and public sectors.
<pb n="422" />

                                                403

                      (3) Long Range Energy Plans and Forecasts Prepared by Private
                           Sector with State Designated Guidelines and Criteria
                  This option provides'for re
                                             .gulatory oversight of private long range
          plans and forecast preparation. Under this approach the state would stipulate
          the conditions for plan and forecast preparation. This would involve promulga-
          tion of rules.and regulations outlining procedural requirements, public parti-
          cipation in the planning process, identification of planning and forecast method-
          ologies employed, substantive content of informational requirements, the number
          and types of alternatives that must be examined, and other factors. It is also

          possible to include within these guidelines the criteria by which to,assess the
          probable environmental impacts of the prospective sites outlined in the long
          range plans and forecasts. Another approach would be to require the evaluation
          of these sites in terms of some set of state designated site suitability cri-

          teria.

                  Implications. This option implies legislated authority for'government
          involvement in long range planning conducted by the private sector. It also
          involves public disclosure of energy plans and forecasts. There are several
          advantages associated with this particular approach. Opening the planning pro-
          cess up to public scrutiny greatly increases the accountability of actions by
          the private sector. Establishment of standards and criteria by which to pre-
          pare such plans and forecasts provides a well defined and consistentbasis on
          which the private sector can rely. This reduces confusion, improves the
          efficiency of government, and limits unnecessary cost incurred by the private
          sector. Administration of such a program could be achieved by a public utility
          commission, a state energy office, the principal energy facility siting office,
          the lead coastal-zone management agency, or some combination of these organiza-

          tions.

                  b. Environmental Impact Assessment
                  An important concern in the siting of,energy facilities is the impact of
          the facility on the surrounding environment. Options for delegating responsi-,
          bility for impact assessment include:(1) require the applicant for a facility
          site to provide a report on environmental impacts to the state; (2) assign the
          responsibility to a state agency; or (3) require that the assessment be performed
          by an independent consultant. The independent consultant may in turn be respon-

          sible to either the applicant, a state agency, or perhaps, the local
<pb n="423" />

                                                     404

               government with jur isdiction over the proposed site (NY).
                       Implications. The credibility of impact assessments would probably
               be enhanced if the responsibility were placed with a government agency. If the
               actual study were performed by the state, it might be easier to achieve a uni-
               form methodology for comparing sites. If the-assessment were performed by the
               private sector,, assessment criteria could be established by the state.

                       c. Final Site Approval
                       Land use control (zoning) has largely been delegated by the states to
               local units of government. Retaking of a segment of this power by a state
               would involve major decisions. At the state level, final responsibility for
               site approval may rest with a siting council (NY,,OH, MD) or with the Governor
               (OR, WA) or with the legislature. Legislative approval may be reserved for
               special cases such as nuclear power plants (VT). The status quo in many states
               would keep zoning as the province of local units of government. However, com-
               pliance with the Coastal Zone Management Act requires that the state exercise at
               least a modicum of control over local zoning in the coastal zone.. The Act lists
               two options short of direct state land use control: 1) state establishment of
               criteria and standards for local implementation, or 2) state review of all
               development plans, projects, and zoning regulations for consistency with the
               state's coastal zone management program. The state may choose to extend control
               in either case to the entire state. Note that this would effectively address
               all projects and facilities; not just those related to energy-
                       Implications. Giving authority for site approval to local governments
               does not provide for consideration of the regional or statewide interests in-
               volved in large energy facilities. Distinguishing the control over coastal
               zone 'siting from that which applies to the remainder of the state may hinder
               the rational selection of a site from among coastal and inland alternatives. A.
               state siting agency, with provisions for prior approval by.the coastal zone
               management agency of proposed sites in the coastal zone (CA), would provide for
               both consideration of state/regional interests and special attention to the

               coastal zone.

                       d. Monitoring
                       All states are required by federal law to monitor the quality of air and
               water resources within their jurisdiction. A state may choose to expand this
<pb n="424" />

                                                   405

          monitoring program to include a broader range of environmental factors affected
          by energy facilities (MD).    This would involve   sampling of natural parameters
          --@such as physical, chemical, and biological effects, and   cultural parameters
          such as changes in land use   patterns and social   and economic conditions associ-
          ated with the construction,   operation, and maintenance of a facility. Responsi-
          bility for environmental monitoring could be: 1) delegated to local government,
          2) assigned to a private consultant, 3)' assigned to the energy corporation, or
          4) placed with the state environmental protection agency or department of

          natural resources.

                  Implications. A-comprehensive program for monitoring the environmental
          effects of energy facilities would provide valuableinsight into those aspects
          of energy development that are typically of greatest concern. It may also indi-
          cate substantive areas in which criteria and standards for energy facility sit-
          ing and for protection of air or water quality in general appear to be either
          overly stringent, reasonably sufficient, or inadequate.

                  e. Conservation

                  In recognition of the scarcity of energy resources on an economic       or
          geographic basis, or of the adverse.environmental impacts resulting from their
          use, the state may choose to implement a program of energy.conservation. The
          scope.of such a,program may range from a requirement that utilities (and others)
          describe conservation efforts as part of their plans, to a state agency with
          .responsibility for specifying building codes, appliance and automobile effi-
          Piencies and other measures to reduce demand and thereby reduce the number of
          energy facilities required.
                 .Implications. Energy facilities in general represent huge       commitments
          of resources, including land, and have significant adverse impacts      on the
          environment. If an aggressive state program for energy-conservation can'slow
          the rate of growth in  energy demand, the effect should be to slow the rate of
          construction of energy facilities, and, thus, slow the rate at which siting
          decisions must be made and reduce the number of sites occupied at any given time
          in.the future; Conservation can provide the siting regulation process with
          the option of not siting a proposed facility. For further details related to
          this option, the reader should consult Chapter V, Regional Scenarios of Energy
          Development. The discussion there concerns a range of electrical energy.growth.
                  The energy industry, as part of our economic system, is probably
<pb n="425" />

                                                     406

               dependent on growth'for its economic well-being. In the regulated utility
               sector, a slower growth rate may require adjustments in the rate scheme, but
               this could be handled by the traditional regulatory mechanism. In the private
               sector, the gradual slowing of the rate of energy consumption could result in*
               the shifting of economic resources away from energy production.

                   5. SITING PROCEDURES

                       The siting process may entail a variety of procedures, most of which are
               independent of the responsible regulatory agency. However, the procedures
               listed here generally assume a strong state role in the regulation of energy
               facility siting. Several options and their implications are discussed for each
               of four procedural categories: the application process, site selection, treat-
               ment of generic issues, and funding.

                       a. Applicatio Process
                       The regulation of siting implies that the construction of facilities
               will follow an application process to decide the merits of a site. The formal
               application may be preceded by a notice of intent to file such an application.
               Actions taken on the notice of intent would include a preliminary evaluation of
               the site and notification of potentially interested parties. Public hearings

               may be held on the notice of intent.
                       The application itself may describe the site and the facility to be con-
               structed thereon. Public hearings would most likely be held at this stage with
               time limit s specified for the completion of the site approval process. The
               state may require that the application include not only a preferred site, but
               one or more alternative sites as' well. Coastal states may specify that at least
               one alternative be outside the coastal zone. A separate application process may

               be established for sites in the coastal zone.

                       Implications. Requiring a notice of intent allows time for a prelimi-
               nary site evaluation before an application fee may be required. Public hearings
               at intervals throughout the site approval process,help assure that the results
               are responsive to public needs and desires. The specification of time limits
               for the process assures the applicant that there will be no delays while allow-
               ing ample time for consideration of all aspects of the issue.
                       Where the constructor of An energy facility is free to select which sites
               to propose, the requirement for proposing alternative sites allows comparisons
<pb n="426" />

                                                407

          of the relative advantages of each site. This is especially important with re-
          gard to coastal sites where both the magnitudes of the-advantages and disadvan-
          tages may be greater than for an inland site. The requirement for prior approv-
          al by a coastal zone management agency for sites in their jurisdiction insures
          protection of the coastal zone but denies the opportunity to compare the rela-
          tive merits of coastal and inland sites. With regard to comparison of coastal
          and inland sites, the reader is directed to the case Study and discussion of
          coastal dependence that appears in Chapter IV.A.6.

                  b. Site Selection

                  Several options exist for a state to assure selection of acceptable
          sites for energy facilities., The normal situation would leave-the decision to
          the constructor of the facility through the application process. Advance con-
          sideration of siting problems by the state may lead to one of.the following:
          establishment of criteria to be used by the.constructor in the selection of
          sites (MN); designation of regions of the state that are suitable/unsuitable for
          various types of energy facilities (OR); establishment of inventory of specific
          sites (MN); or actual purchase of land by the state for eventual-lease or sale
          as sites-(MD).
                  Implications. The-plan-disclose-defend paradigm of site selection is no
          longer satisfactory when a state chooses to regulate the siting of facilities.
          An applicant for site approval deserves to at least be aware of the criteria
          that the state will use in evaluating the suitability of proposed sites. Estab-
          lishment of such criteria facilitates generic treatment of siting cases (see
          section c. below) and serves to reduce ambiguity-in the decision-making process.
                  The designation of suitable and unsuitable regions for various energy
          facilities may be used in addition to siting criteria. Such designations
          result from the application of certain criteria, most likely those related to
          air and water quality, to all regions (such as airsheds and watersheds) of the
          state, taking into account the expected environmental impacts of each type of
          facility.. This would also serve to provide applicants with needed information
          to reduce wasted efforts of studying and proposing unsuitable sites.
                  Carrying the process one step further, the state could establish an
          inventory of suitable site s, taking over the site selection function altogether.
          Potential applicants could work with the state in establishing the inventory
          and in proposing sites to be included. This may require the prior establishment
<pb n="427" />

                                                    408

              of criteria to be used in the selection of sites and the whole process might be
              relatively time-consuming and expensive, but once the. inventory is established,
              siting would be a relatively simple process.
                      The purchase of potential sites by the statecan serve to assure that
              suitable sites are available, even if proposed sites are rejected. A revolving
              fund could be established to purchase an initial inventory of sites.

                      c. Treatment@of  Generic Issues
                      In the siting of energy facilities thereare a number of issues that
              recur in the siting process. Such issues include: "questions of proper demand
              policies, allocation of research efforts, the amount of new capacity needed, and
              proper safety, environmental and land use standards" [6131. Some aspects of
              these generic issues may be decided upon separate from (and prior to) the site
              approval process. Some.generic issues related to site selection are discussed
              in the previous section b.
                      Implications. Treating common issues beforehand simplifies the siting
              process by reducing the volume of material to be considered in individual cases.
              It can also serve as a means for providing applicants with information that
              enables them to forego making proposals that are unacceptable to the state.
              Furthermore, separate treatment of generic issues serves to reduce ambiguity
              in the site approval process.

                      d. Funding
                      As a function of state government, the regulation of siting may simply
              be funded through the normal budgetary process. However, energy facilities
              offer a great potential source of funds that may be applied either directly or
              indirectly to the siting process. Assessments may be considered in two broad
              categories: application fees and annual fees. The two are riot mutually exclu-

              sive..
                      The application fe e is a one-time charge to be paid upon submission of
              an application for sitelapproval. Theamount may be fixed or may be a variable
              charge based,on the size of the facility, measured either in terms of its
              estimated cost or its design capacity (megawatts, barrels per day,,etc.). The
              fee may fund the general operations of the siting process or be earmarked for a
              specific purpose, such as environmental impact assessment.
                      An annual fee may be assessed against all potential applicants for an
<pb n="428" />

                                                    409

           energy facility site, or at least against those with existing facilities. The
           fee may again be a fixed fee, or a variable one based on the output of the
           facility in the past year, measured either in terms of quantity of output or
           dollar sales. The state may choose to determine an adequate sum for funding
           the siting process and,associated functions and assess those regulated on a

           proportional basis.
                    Implication@j. Making site   regulation financially independent.relieve.s
           the burden on the state's general budget and obviates argument.s against the
           establishment of such a function on financial grounds. The resultant higher
           energy.rates may slightly reduce demand.

               6. SITING CRITERIA AND STANDARDS

                    a.. State Designation of Site-Suitability Criteria
                    The state may wish to develop a set of criteria.by which to evaluate
         ..various  energy facility siting proposals. These criteria could be quite general
           or they  could,be specified in detail. General criteria usually involve.rather
           broad statements that relate, to protection of    the environment, provision of ade-
           quate supplies of energy, protection of the general public health, safety, and
           welfare, conformance with existing land use and/or energy plans, and,other
           factors (NY,OH). Specific site suitability criteria involve a detailed analysis
           of the physical capabilities of the resources affected, the specific resource
           requirements of the types of facilities under consideration, and the probable
           environmental impacts   of those facilities. These criteria can be translated
           into geographic areas  within the state which represent varying degrees of
           suitability for energy facilities. The state could thus maintain an inventory
           of suitable sites by which to evaluate future siting proposals (MD, MN).
                    Implications. Site suitability criteria designated by the statewould

           insure consideration of factors in the    evaluation of alternative sites that

           are of statewide concern. If the criteria were structured to incorporate
           factors representing the broad spectrum of environmental protection and
           natural resources management policies, the site review process could be stream-
           lined and the relationship between these various policies and the resultant
           trade-offs could be identified and evaluated. The success of this approach
           depends largely on either a unified statewide land use policy, or an integrated,
           comprehensive set of policies which together represent an overall statewide
           policy.
<pb n="429" />

                                                     410,

                      The use of general criteria provides for consideration of general
              concerns about the environment, future energy-needs, and other factors. It
              permits considerable flexibility,in the means by which the criteria are satis-
              fied. However, past experience indicates that other state and federal laws
              that have taken this approach have been subject to a wide variety of interpre-
              tations in the early stages of applying such criteria, and a great deal of
              uncertainty often exists as, to what is required to satisfy these general cri-

              teria.

                      Through the application of specific site suitability   criteria, it is
              possible to incorporate specific elements of existing state land use and energy
              development policy into the energy facility siting process.    Such elements
              include air and water quality standards, soil erosion and sedimentation con-
              trol criteria, solid waste disposal standards, radiological standards, and other
              factors. It is also possible to incorporate other state policies and program
              elements such as areas determined to be of critical stae envi  ronmental concern,
              areas in.which economic development is encouraged, natural hazard areas, and so

              forth.

                      Establishment of energy facility site suitability criteria would prob-
              ably be achieved through promulgation of rules and regulations by the lead

              state siting agency, such as a public utility commission, a department of
              natural resources, a siting council, or some other agency.

                      b. Separate Site Suitability Criteria for Different Types of Energy
                          Facilties

                      Separate criteria could be developed for each type of energy facility,
              such as petroleum refineries, nuclear power plants, coal power plants, etc. It
              would also be possible to establish criteria for different size facilities.
              Under. this approach, proposed energy facilities could be grouped in generic
              categories and evaluated under separate site suitability criteria. Another
              approach would be to conduct a statewide inventory of sites that would be suit-
              able for these generically different types. Technical analyses would be con-
              ducted for the various types of energy facilities of concern to   the state and
              specific resource requirements could be determined. The physical capabilities
              of air, land, and water resources to support these generic types could also be
              ascertained.

                      Implications. This option could streamline the energy facility siting
<pb n="430" />

                                                  411

          'proc ess considerably. Similar siting proposals could be evaluated more effi-
          ciently, since past experience would identify those factors that are likely to
          warrant special consideration and those that are routinely similar. In order to
          implement this option a considerable amount of research and planning would be
          required. This may involve extensive monitoring of existing energy facilities
          (MD).

                  c. Detailed Siting Criteria for the Coastal Zone
                  This option would involve the application of detailed criteriato pro-
          posed energy facility sitings in the coastal zone of a particular state. This
          option presumes that the.state had not established siting criteria for non-
          coastal areas. These criteria could be based on a detailed re6ource inventory
          of the.state's coastal zone and could indicate suitability of various land and
          water uses in the coastal zone through consideration of areas of particular con-
          cern, permissible uses,- priority uses, etc. In addition, coastal zone siting
          criteria could include factors such  )as environmental opportunities or con-
          straints determined by applicable air and water standards and other factors

          related to physical capability.
                  Implications. This option could foster the achievement of policies for
          energy facility siting in the coastal zone in states where regulation of energy

          facilities is limited. Because the institutional framework for coastal zone

          management has bee n developed to a higher degree than that for non-coastal areas
          in several states, it may be easier to approach the,energy facility siting prob-
          lein by working within the existing CZM planning framework. However, separate

          and,distinct treatment of energy facility-siting in the coastal zone, as opposed
          to a broader statewide approach, may result in a lack of balance regarding both
          coastal and non-coastal needs and problems. This problem could be partially
          eliminated if suitability criteria for energy facility siting in the coastal
          zone were developed with full consideration of the remainder of state, regional,
        .,and local policies, standards, and criteria   relating to land use and energy
          development. In order to implement this option, enforcement provisions1would
          have to be established to insure adequate consideration of these coastal-
          specific criteria in the siting process. This could be achieved by placing
          authority within the lead CZM agency, by establishing a mandatory review and
          comment process, or by formal or informal interagency agreements.
<pb n="431" />

                                                     412

                       d. Point of Application of Suitability Criteria

                            (1) Application of Suitability Criteria to Long Range Plans and
                                 Forecasts

                       This option involves the application of site suitability criteria to the
               prospective energy facility sites identified in long range plans and forecasts.
               Two states (MD, MN) have taken this approach in the regulation of electric gener-
               ating plants. This option would involve evaluation of the land holdings of the
               various'energy companies or of sites,under consideration for acquisition. It
               would facilitate the development of an inventory of suitable sites within the
               state. Determination that a site was unsuitable could serve as grounds.for

               elimination of that site from further consideration.
                       Implications. The application of suitability criteria at the long range
               planning stage would have many desirable implications.. For example, demonstra-
               tion by the energy development companies that a proposed site is deemed accept-
               able by a set of reasonable yet comprehensive suitability criteria would
               increase the likelihood that the site would receive final approval. This
               would greatly reduce the uncertainties associated with energy development, and
               may well reduce the regulatory lag time  that has plagued energy facility-siting
               in the past. This would also permit adequate lead time for local and regional
               interests to express their views and to adequately plan for the provision of
               necessary public services and to manage the resultant environmental impacts.
                       This option implies some state involvement in development of long range
               energy plans and forecasts. It also implies that the appropriate decision-
               making body has authority to establish policies and procedures requiringicom-
               pliance by the private sector. Presumably, satisfaction.of the suitability cri-
               teria would constitute acceptance of a.proposed site, and failure to satisfy the
               criteria would imply either outright rejection of the site or acceptance only
               -upon satisfaction of certain site development conditions.

                           (2) Analysis of Site Suitability at Time of Application for
                                Approval
                       This option would provide for the evaluation of the suitability of a
               specific site at the time of application for site approval. The private sector
               would conduct its own preliminary assessment of alternative potential sites and
               would choose a preferred alternative. In states where there is no principal
               lead agency to administer the existing energy facility siting program,
<pb n="432" />

                                                   413

            the suitability analysis at the time of application could be handled by the
           state coastal zone agency, by the state environmental review board, or by.the
            rinciDal envir6nmental protection or natural resources mana
           p                                                                gement agency. Ade-
           quate consideration of regional and local problems and needs could be arrived at
           through a variety of organizational structures, review procedures, public involve-
           ment mechanisms, and other means.
                   Implications., Under this option, it would be the prerogative of the
           private sector to conduct preliminary site suitability analysis according to its
           own criteria. However, the state-designated site suitability criteria to be
           applied at the time of application for approval would significantly influence
           the preliminary site suitability criteria employed by the private sector, be-
           cause pursuit of sites unlikely to satisfy the state-designated suitability cri-
           teria may be a poor investment of time and money. If the state criteria were
           sufficiently comprehensive and sufficiently flexibleto allow for Variable con-
           ditions, these criteria could serve as an effective set of guidelines by which
           state utilities and other energy companies could evaluate the suitability of
           their prospective future sites., The application of these suitability criteria
           implies some sort of state regulatory authority over energy facility site loca-
           tions.  Such authority would benecessary if this approach is to be effective.

                   e. Designatioq of Environmental Impact Assessment Criteria for Site
                       Evaluation

                   A state may wish to establish criteria for the assessment of the envi-
           ronmental effects of siting proposals., Following the lead of the National En-
           vironmental Policy Act of 1969 (NEPA), numerous states have taken the initiative
           in this area and have developed their own statewide environmental impact review
           processes (IN, MI, MN, NY,  WI). Other states (NY, OH) have incorporated assess-

           ment criteria in their power plant siting regulatory     programs. Criteria can
           either be very general or quite specific.     General impact assessment criteria
           are broad statements which permit a great deal of flexibility in their inter-
           pretation. Specific criteria often take the form of various categories of in-
           formation'required, and often list specific data that must be collected to
           supply this information. These criteria can also include information that is
           required under the various federal and state permit programs in effect in the,
           state, such as those required.under the Clean Water Act (NPDES permit) and the
           Clean Air Act (permits to construct and operate), and state programs for
<pb n="433" />

                                                         414

                soil erosion/sedimentation control, resource recovery, critical area or
                resource protection, and other applicable programs. In addition,, assessment,.'
                criteria could be developed to reflect -Factors of particular concern to the

                coastal zone.

                         Implications. There are several advantages to stipulating environment-
                al impact assessment criteria for proposed energy facilities. Carefully de-
                signed criteria can include nearly all of the information and data require-
                ments included in the various permit systems, and can thus serve as a mechanism
                by which to streamline the approval process. Also, criteria that are clearly
                stated and well understood can serve as a solid foundation for adequate con-
                sideration of those areas of greatest concern in coastal and inland locations.
                This would also reduce uncertainty in the private sector about the kinds of in-
                formation that would ultimately be required in the siting process. Once a par-
                ticular set of impact assessment criteria has been applied to various     .proposed

                site locations, a correlation would be established between various kinds of

                energy facilities and the probable environmental impacts.

                    7. FINANCIAL MECHANISMS

                         It is generally agreed that financial problems are among the most severe
                of problems currently facing energy development. These problems have arisen
                from uncertainties about governmental policies and from difficulties in capital
                formation)in the private sector. If implemented, many of the options outlined
                above could streamline the regulatory process and thereby reduce uncertainties
                and resultant financial risks. For a number of'reasons, the states may wish to
                employ various financial mechanisms to facilitate the wise development of
                energy.    In addition to directly encouraging or discouraging the siting of new
                facilities, financial techniques can be employed to promote energy conservation
                and thereby reduce the need for new facilities, insure an adequate mix of fuels,
                encourage the application of new technologies, and ameliorate the adverse ef-
                fects of facility sitings. Options associated with these mechanisms canbe
                categorized under three headings: 1) methods of generating financial resources,
                2) direct public investment in energy development, and 3) incentives for energy

                development by the private sector.

                         a. Methods of Generating Financial Resources
                         Several options are open with regard to obtaining revenues for the
<pb n="434" />

                                                 415

          administration of various aspects of energy facility programs. The following
          list of such methods is presented to stimulate additional thinking in this
          area and is not intended to be exhaustive.

                      (1)   Appropriations from General State Revenues
                      (2)   Issuance of Industrial Revenue Bonds
                      (3)   Consumption Tax on Fuels and/or Energy Forms
                      (4)   Tax on Goods that are Less Energy Efficient than other Goods
                            of the Same Type Due to Design or Construction
                      (5)   Tax on Energy-intensive Goods
                      (6)   Charges for Operating Source of Pollution
                      (7)   Federal Assistance from a Potentially Wide Variety of Sources
                      (8)   Fees for Site Applications and Long Range Plans and Forecasts.

                  Implications. Numerous scenarios can be developed which incorporate
          one or more of these options with other institutional options outlined in this
          report. The implications of employing one or more of these revenue sources will
          depend on the details involved. No attempt will be made to elaborate on these
          implications.

                  b. Direct Public Investment

                      (1) Direct Siting of Facilities and Production of Energy (Electric
                            Power) by the State
                  This option and its implications were discussed above under Section 2,
          Siting Policy. In particular see Section 2.f., State Power Authority.

                      (2) Joint State Provate Sector Corporations
                  this option would entail the joint financial underwriting of new energy
          facilities,by both the public and private sectors. This would probably be most
          feasible for the electric and gas industries. Public and private sector siting
          considerations and investment criteria would be combined to determine siting de-

          cisions.
                  Imp.lications. Under this option, state government would be required to
          work closely with one or more of the var ious sectors of the energy industry to
          jointly finance new facility sitings. It is not inconceivable that such an
          arrangement may require extensive negotiations involving two sectors of society
          that are often-diametrically opposed. Details of other phases of the siting
<pb n="435" />

                                                      416.

                process, including long range planning, site selection, and site certification,
                would have to be clearly defined so that a high degree of visibility could be
                achieved in this potentially controversial arrangement.
                        This option has the potential for providing the best features of both
                public and private sector involvement in energy facility siting. The state may
                be more able to provide a stable source of financial resources for facility
                development [4571. It can also provide adequate insurance, through the demo-
                cratic process, that public financial resources willbe invested in projects
                that reasonably satisfy objectives for economic development, equitable distri-
                bution of resources, and environmental quality.

                            (3) State Financing of Energy Facility Development by the Private
                                 Energy Corporations
                        This option would involve state'financial assistance to the energy cor-
                porations. Options for raising the necessary capital were presented in the pre-
                vious section. The probable means of financing would be state loans or loan

                guarantees.
                        Implications. This option would require legislative authority to invest
                public resources in quasi-public (electric and gas utilities) or private (fuel
                production) energy companies. It is likely that the state would require that
                certain conditions or criteria be met by the private sector, although these

                would not be as extensive as those encountered with a more direct state involve-

                ment.

                        C. Incentives for Energy Development by the Private Sector
                        Options under this heading imply a lower degree of economic risk in
                ventures undertaken and probably.a slower market response to the stimuli.

                            (1) Positive Financial Incentives for Siting

                                 (a) Tax incentives

                        Tax incentives can be used in a number of ways to encourage energy fa-
                cility siting. Investment tax credits could be employed to stimulate the
                development of associated facilities. Accelerated depreciation allowances
                might also be used to achieve these ends.. In addition, deferred taxation may
                be applied to minimize immediate siting costs. The state may also wish to pro-
                vide credits against state income tax for local property taxes paid by energy
<pb n="436" />

                                                    417

            facilities.

                     Implications. Tax incentives must be justified as an appropriate solu-
            tion to a well-defined problem (private market imperfections in the energy in--
            dustry)    They have been employed at the federal levels (oil depletion allow-
            ance) and they tend to come under close public scrutiny. Tax incentives would
            have to be designed to avoid undesirable redistributions.of income.
                     Tax incentives are related to the facility rather than to the site.
            Since facility development, operation and maintenance costs are very large'com-
            pared to site acquisition costs, incentives to limit the former may be quite
            effective in stimulating new energy facilities.

                             (b) Financial incentives for site@location

                     This option builds on.the concept of the previous option. It may be
            desirable to provide strong positive financial incentives to site energy facili-
            ties at predetermined locations or at(sites that are.otherwise deemed suitable.
            This could be achieved by providing the'tax incentives of th    e previous option
            for predetermined sites or for sites that meet state-designated suitability

            criteria. Such incentives would not be available for other sites.
                     A variation on this option would entail state acquisition of suitable
            sites with the sites subsequently being sold to energy corporations at either a
            token price or at 'a somewhat reduced price., The previous option could then be
            tied into the arrangement.
                     Implications. The   legality of this option would have to be determined.
            In order to be acceptable,   the use of this option would probably have to be
            based on well-defined long   range plans for energy development and economic
            growth. Steps would have    to be taken to insure equitable distribution of the

            related costs and benefits.

                         (2) Negative Financial Incentives for Siting
                     Options under this heading would be characterized by fees, penalties, or
            other charges to discourage the siting of energy facilities in certain area     .s or
            to provide a source of revenue to ameliorate the adverse effects of'locating a
           .site in those areas. This option could be used to discourage siting in coastal
            areas that are deemed unsuitable for energy facilities. Negative financial in-
            centives could be graduated to reflect the relative desirability of siting in
<pb n="437" />

                                                    418

             various coastal or inland areas.

                     Implications. The employment of negative financial incentives implies a
             reactive approach to siting regulation. This option, along with other options
             that provide financial incentives or disincentives, should be based on a ra-
             tional plan for energy-development in the state. Since these options tend to
             create-spillovers into other sectors of the local or regional economy, the
             probable implications would have to be fully assessed.

                 8. INTERGOVERNMENTAL   RELATIONS

                     a. S@ate-Federal   Relations

                     The federal role in energy facility siting outlined in Section III.B.
             indicates that there are several aspects of siting that involve federal agencies.
             Section 307 of the Coastal Zone Management Act (CZMA) requires that federal
             actions be consistent with"approved state CZM plans. The Act also requires that
             states consider the national interest in the development of CZM plans and pro-
             grams. Greater coordination between the states and the federal government in
             energy policy and in the.siting of energy facilities will promote economically
             efficient, publicly acceptable and environmentally sound energy    development.
             The options described below suggest alternative mechanisms by which the Great
             Lakes states might interact with the federal government to achieve thes   e objec-
             tives and implement the portions of the Act requiring consistency.

                          (1) Coordination and Consolidation of Siting Procedures
                     A variety of options exist under this general heading. These options
             are associated with the'phases of energy facility siting regulation that are
             typically encountered in state siting programs. The approaches taken by a par-
             ticular state would depend on the siting procedures currently employed or on
             those that may be selected by the state from the institutional options outlined

             above.

                              (a) Long range planning
                     To align the long range plans and forecasts for energy development of
             the federal and state governments, the states may atte  mpt to incorporate federal
             agencies concerned with long range energy planning (e.g., ERDA., NRC, FEA, and
             the FPC) into the long range planning process employed by the state. This
<pb n="438" />

                                                 419

           could be achieved by requesting extensive review and-comment by these agencies
           on state plans, by requesting that these agencies attend public hearings and ad-
           ministrative meetings held by' the ;tate on long range plans and forecasts, and
           by seeking clarification of federal policy in various substantive areas address-
           ed in the state energy planning process.
                   Implications. This option implies that the state.has some involvement
           in long range energy planning. It may facilitate the identification of those
           aspects of state and federal energy facility siting policy that are likely to
           generate controversy and thus require special atte@tion. Resolution of these
           issues early"in the process will streamline siting regulation by reducing
           delays.

                           (b)  Involve federal agencies in the state site certification
                                process
                   This option would provide for direct involvement of the appropriate fed-
           eral agencies in the site review and evaluation process. Representatives of
           these agencies would participate in the internal review process by acting as
           resident liaisons between their respective agencies and the state siting bu-
           reaucracy and CZM agency. For.example, representatives of the U.S. Environ-
           mental Protection Agency could interpret applicable air and water quality'stan-
                as they relate to the specific siting proposal under consideration in the
           state application process. The FPC could evaluate the proposal (for an electric
           generation facility) in terms of the degree to which it increases the'-reliabili-
           ty of electricity production and meets well-defined energy demands. Other fed-
           eral agencies could be incorporated in the process as warranted by the types of
           energy facilities and locations involved.
                   At the same time, federal agencies could take this opportunity'to obtain
         .state approval for federal actions affecting the coastal zone as required under
           the consistency provisions of the CZMA. Permits issued by the Corps of Engi-
           neers for structures in navigable waters or by the EPA for pollutant discharges
           could bediscussed and a determination made with regard to joint state and fed-
         .eral approval.
                   Implications. Increased participation of the federal. government in the
           state energy facility site certification process would have to be handled very
           carefully to avoid charges of federal encroachment in state siting-matters.' The
           important point with regard to this option is that the states as well as the
<pb n="439" />

                                                       420

              federal government could benefit from increased communication and cooperation in
              the certification of energy facility sites. This option would provide for enun-
              ciation in, the siting decision process of the specific aspects of f ederal policy,
              such as site evaluation or site suitability criteria, and air, land, and water
              pollution control standards, which must be complied-with, or which reflect those
              interests and concerns of society that are represented by the federal govern-
              ment. Importantly, the Coastal Zone Management Act requires consideration of
              ,the national interest in the siting of facilities that are of greater than.local
              significance. Also, by bringing the.fe     deral agencies into the certification
              process, and by encouraging p   ublic participation, the states could facilitate
              the resolution of policyconflicts with the federal government.

                          ..(2) Consolidation of, State and-Federal,Environmental Impact Assess-
                                 ment Processes

                       Federdl  agency environmental assessments under NEPA, and state environ-
              mental assessments required under a statewide program or under the state's
              energy facility siting regulatory program would be consolidated under this
              option. This could involve combined assessment criteria, uniform time limits,
              coordinatedreview procedures, and     jointpublic hearings..'This option could be
              applied to environmental impact assessments of prospective sites outlined in.
              long range plans or of sites for which application for final approval has been

              made.

                       These combined assessments could be performed by the      lead state siting
              agency,.or. by a consultant, or the individiualagencies could      contribute   their
              respectiv&amp;,.inputs to be compiled,   possibly by,the state.
                       Implications. This option would eliminate much of the      duplicated effort
              that currently Pxists   in the regulation of energy facilities.     A s ignificant
              savings of public resources might result. This option.may also reduce the over-
              all time required to evaluate proposed sites. Each interested party could.re-
              view  the resultant impact statement with its own particular interests in mind.
              Impac-t assessment guidelines should be developed toinsure that all significant
              impacts  are addressed in the analysis..

                       b.. -02tions for Interstate Relations
                       Many of the problems and needs related to energy facility siting can be
              handled  either on an intrastate basis or through establishment of appropriate
<pb n="440" />

                                                 421

           state-federal relations. However, several siting issues will probably not be
           adequat' ely addressed by these institutional mechanisms.@ It is with regard to
           these issues that a sound case.for an interstate regional approach to siting
           regulation can be made.

                       (1) Establishment of Multi-State Regional Siting Council
                   This option would entail the formation of an organization by two or more
           states to deal with siting-related problems and needs that are not confined to
           onestate. This organization could take a variety of forms. Membership would
           depend on the functions and authority assigned.
                   Contiguous Great Lake states may wish to employ such an organization
           comprised of CZM program administrators to coordinate energy facility siting in
           the coastal zone. The influence of a regional CZM siting council would depend
           not only on the authority of the council itself but on that of the CZM programs
           within the respective states. Another approach to an interstate regional
           siting-council would be to.include as members the heads of the lead state
           energy facility siting regulation agencies. This would involve CZM considera-
           tions as part of the broader set of statewidesiting considerations.
                   If the principal function of the regional siting council were to assess
           the impacts of proposed sitings, the council might be structured to include
           heads of natural resource departments and/or environmental protection agencies,
           or representatives from state-level environmental review boards of citizen-
           advisory committees.
                   It would also be possibl6to establish a skeletal framework for a re-
           gional siting council and activate it on an ad hoc basis as the need arose.
                   Implications. There are several advantages associated with this option.
           An interstate organization would provide a.mechanism for the resolution of
           energy facility siting-related conflicts between states. It would also   provide
           a single forum for interacting with federal energy-related agencies, and would
           strengthen the position of the states vis a' vis the federal government. With
           regard to' electric power generation, the private sector, through federal en-
           couragement, has already recognized the need for such cooperation by establish-
           ing regional reliability councils to coordinate interstate electric power flows.
                   Implementation of this option would require some form of agreement be-
           tween the states, such as parallel state legislation, memoranda of agreement or
           other mechanisms to bring the states together.
<pb n="441" />

                                                      422

                           (2) Establish an Interstate Regional Siting Approval Process
                       This option would entail joint approval of certain kinds of energy
               facilities by the states involved. This process could be limited to those pro-
               posed sitings that would.have-significant, direct impacts on the environments
               of two or more states, or that will substantially alter the future availability
               of energy in.two or more states. For example, the siting of, say, a large
               nuclear or coal-fired electric generation plant in a state's coastal zone may
               have significant direct impacts on coastal or other areas of one or more nearby
               states, and it may materially influence future growth patterns in those.states

               as well.

                       Implications. This option would necessitate a formal mechanism for
               agreement between two or more states. This implies either approval by a formal
               interstate siting  council or the separate approval by the agency   or agencies
               that have, regulatory authority for siting in the   states involved. In    addition,
               approval by the federal  sector (depending on the   location and type of   facility)
               would also be required,  as would approval by other levels of organization within
               a particular state.
                       The effectiveness of this option would be   maximized if the individual
               siting regulation programs of the states involved   were well defined and well
               coordinated with other environmental and land use    policies and programs in those
               states. Public acceptance of this option would be critical to its.success.
               This option also implies that the states participating in regional site certifi-,
               cation are capable of and willing to adopt specific policies regarding si.ting-
               related issues to guide their actions in joint siting decisions. This option
               may act as a catalyst in forcing the states to delineate thqse policies.

                            (3) Institute an Interstate Regional Process.for Predesignation of
                                 Suitable Sites

                       This option is an extension of one described earlier. It would involve
               the aggregation of sites deemed suitable by each state into an overall set of
               suitable sites in the Great Lakes Basin or some sub-region thereof. It could
               involve the entire area or only the coastal zone of each state.
                       Implications. Through this approach the states could strengthen their
               bargaining positions with other levels of organization in the overall siting
               process. Also, this option fosters an active rather than reactive approach to
               siting regulation by identifying suitable sites, thereby    indicating areas where
<pb n="442" />

                                                423

          energy development could generally be favorably received. Identification and
          predesignation of suitable energy Jacility sites implies the application of
          some criteria by which to judge sitesuitability. The relationships between the
          suitable sites of adjacent states would have to be determined to avoid conflicts
          and to reasonably meet each statel.s goals and objectives for energy development,
          economic growth, and environmental quality.
                  This option implies that the appropriate organizations and legal.author-
          ities exist in'various states to pursue a multi-state regional approach to
          energy facility siting. To be most effective, this approach requires active
          state participation in the preparation of long range energy resource and facil-
          ity plans and demand forecasts. An ongoing, multi-state, long range energy
          planning process would increase the rationality of siting and would largely
          determine the site suitability criteria and the priorities for siting new
          facilities with a particular state. This option would be strengthened if the
          states chose to acquire certain interests in sites and to encourage develop-
          ment on those sites through a promotional campaign.
<pb n="443" />

                                                      424

               C. TECHNICAL OPTIONS

                   1. FRAMEWORK

                       The technical options related to energy facility siting and development
               with regard to the coastal zone have been arranged to provide a full range of
               policy choices consistent with the Coastal Zone Management Act of 1972. The
               three major groups of options have been categorized as. they relate to jurisdic-
               tional decisions. They are:
                          Exclusion of all new facility development from the coastal zone
               management area, including access to coastal waters and related fuel transshipment.
                       9 Exclusion of all new facility development from the coastal zone manage-

               ment area, but allowing coastal water access, related fuel transportation, and

               product transmission through the coastal zone.
                       e Inclusion of  new facility development in the coastal zone management
               area, except in designated sensitive areas in which additional development would
               be precluded.
                       The coastal zone management area is defined as that area the Great Lakes
               states will designate as the coastal zone subject to their management program.
               The definition of coastal zone used by Coastal Zone Management Act of 1972,
               P.L. 92-583, is as follows:
                       Coastal -zone means thecoastal waters (including the1ands therein
                       and thereunder) and the adjacent shorelands (including the lands
                       therein and thereunder), strongly-influenced by each other and in
                       proximity to the shorelines of the several coastal states, and
                       includes transitional and intertidal areas, salt marshes, wetlands,
                       and beaches. The zone extends, in Great Lakes waters, to the inter-
                       national boundary,between the United States and Canada and, in other,
                       areas, seaward to the outer limits of the United States territorial
                       sea. The zone extends inland from the shorelines only to the extent
                       necessary to control shorelands, the uses of which have a direct and
                       significant impact on the coastal waters. Excluded from the coastal
                       zone are lands the use of which is by law subject solely to the
                       discretion of or which is held in trust by the Federal Government,
                       its officers or agents (Sec. 304(a)). [5821
                       "Coastal'waters" means (1) in the Great Lakes area, the waters
                       within the territorial jurisdiction of the United States consisting
                       of the Great Lakes, their connecting waters, harbors, roadsteads,
                       and estuary-type areas such as bays, shallows, and marshes; and
                      '(2) in other areas, those waters, adjacent to the shorelines, which
                       contain a measurable quantity or percentage of sea water,including
                       but not limited to sounds, bays, lagoons, bayous, ponds, and
                       estuaries (Sec. j04(b)) [582).
<pb n="444" />

                                                 425

         Assumptions included in this discussion of technical policy options are:
                  * All present and anticipated environmental quality standards and
         controls will be aminimum requirement.
                  e Guidelines of the Coastal Zone Management Act as presently stated will
         be followed in the development of the state CZM programs.
                  It is intended that the following policy options provide a wide  range of
         considerations but at the same time avoid any preference or bias toward   either
         the conservational or developmental viewpoint regarding the future of the coastal

         zone.

             2. DESCRIPTION OF OPTIONS

                  a. Exclusion of All New Facility Development from the Coastal Zone
                     Management Area Including Access to Coastal Waters and Related Fuel
                      Transshipment
                  New facility development in the coastal zone as well as all conveyance of
         fuel or coastal waters.through the managementlarea are excluded by this option.
         The aim of this option is to substantially reduce the impacts characteristic of
         energy facilities located in the coastal zone. Exclusion of all new facility
         development is visualized as aesthetically and environmentally beneficial. This
         option presumes a conservative attitude towards the development of coastal

         resources and considers energy facilities to be incompatible with conservation-
         oriented planning objectives in the coastal zone.
                  In the discussion of this option, the implications developed will focus
         on many of the technical, environmental, and economic impacts associated with a
         policy of facility exclusions.
                  Although the policy of exclusion may be the least viable of the three
         general options presented, this option is included to present a full range of
         options for the siting of,energy facilities. Complete exclusion of new facility
         d;velopment from the coastal zone may not.- in fact, serve the intent of the
         Coastal Zone.Management Act to include the siting of facilities of national or
         regional concern.
                  The Coastal Zone Management Act specifies that adequate consideration be
         given to the siting of facilities that  serve the requirements of the national
         interest. Such characterization of energy facility siting may preclude an arbitrary
         exclusion of development within or through the coastal management area. This
         option is therefore presented to illustrate the range of coastal implications
<pb n="445" />

                                                     426

              associated with inland siting and is not designed to portray a prescriptive
              policy concerning energy.
                      Implications. The primary intent of this option concerns the preservaI7
              tion of the environmental, aesthetic, and recreational uniqueness of the coastal
              resources of the Great Lakes. The exclusion of new facility development from
              the coastal zone would permit sizable tracts of shoreline which would otherwise
              be used for energy facilities to remain in existing uses or be used for purposes
              of ostensibly less detrimental environmental impact. One would assume that a
              reasonable adjunct to this stringent policy framework would be an exclusion of
              simila r large scale facilities, e.g., steel plants, from the coastal zone.
              Depending on the viewpoint, implementation of a policy excluding major industrial
              uses from the management area would either greatly enhance the flexibility of
              coastal.resource planning or impose rigid, restrictive, and inflexible management
              of the area. Certainly, land no longer required for energy facilities or their
              associated access rights-of-way for coastal waters or fuels would be available
              for a wide range of uses. Public access to the coast could directly benefit,
              increasing the recreational and aesthetic,value of the coastal zone. The natural

              characteristics of shoreline and near-shore areas not heavily used for recreation
              would be preserved by this option..
                      The development of smaller scale, less resource-intensive,    commercial
              activities might serve to offset the economic liabilities in the management area.
              Small scale activities like light industry may benefit particularly in develop-
              ment at sites once used for energy production. Land around decommissioned fossil-
              fuel energy-facilities could be redeveloped for other purposes. However,
              redevelopment of a portion of a retired nuclear facility directly adjacent to the
              reactor vessel would be generally infeasible due to radioactive contamination of

              the site.

                      Complete exclusion of new energy facility development in the management
              area would reduce the continuation of such long-term environmental impacts in the
              coastal zone. This option would also largely eliminate the milieu of short-term
              and operating impacts associated with the development of additional energy

              facilities in the coastal zone.

                      The movement of,fuels would depend heavily.on inland modes of transporta-
              tion. The exclusion of access through the coastal zone fortransportation of
              fuels would have a direct and significant economic impact on the future of
<pb n="446" />

                                                 427

          commercial lake navigation. The land and inland waterway transportation modes,

          train, pipeline, truck or barge, would assume the balance of additional fuel
          movement. The resulting reduction of cost-efficient Great Lakes vessel transpor-
          tation and the increased use of inland modes would generally raise the delivered
          price of fuels.

                  A technical spinoff of the decrease,in lake transportation of  fuels could
          be an increased utilization of coal scrubbers. The availabili  ty of low sulfur
          coal from the western states has been abetted by the low-cost transportation rates

          via dry bulk vessel on the Great Lakes. The denial of future western coal trans-
          shipment from lake vessel to new facilities would shift the movement of this coal
          to other carriers. The resultant transportation costs may encourage utilities to
          .revert to eastern and Appalachian sources and install sulfur scrubbing systems.
          A-sulfur scrubbing system would then increase the acreage required for solid
          waste disposal. It is estimated that the use of sulfur scrubbers necessitates
          a 100 to 200 percent increase in land available for solid waste disposali The
          expense of this additional land acquisition may be partially offset by the
          generally lower costs and increased availability of larger tracts of land inland
          than are commonly prevalent in the coastal zone. Moreover, the competition for
          land use is regarded as less intense inland than on the coast.
                  The benefits in lower land acquisition costs are largely counterbalanced

          with the economies of inland water utilization. The use of inland water resources
          would in most cases require installation of complex cooling systems (mechanical
          or natural.draft, spray ponds, canals, etc.). which in comparison to once-through
          cooling demand a higher level of maintenance and operation investment. The
          exclusion of access to coastal waters 'for cooling purposes would place enormous
         -pressure on the inland water resources. It i  s questionable whether these
          resources could fully accommodate the increase in water demand. In,some*instances,
          this would require use of currently expensive technologies (e.g., dry  cooling
          towers) and may result in installation of uneconomically sized units and/or the use
          of other types of technology for generating electric power which may not presently
          be fully developed.

                  The policy of facility and access exclusion might also, over time, shift
          the existing pattern of power flow. The prevalent coastal power load might
          gradually shift inland as facilities on the coast were decommissioned, although
          some older urban sites would be redeveloped with energy facilities which might
          even use clean fuels. Depending on site location this trend may involve extensive
<pb n="447" />

                                                    428

              construction of high voltage lines to transmit electricity back to the coastal
              load centers. Overall, the implications would entail a general reorientation of
              transmission systems.
                      Many of the technical drawbacks,that have surfaced within the facility
              exclusion option would probably encourage research in and development of alterna-
              tive energy sources less dependent on water. Closed-cycle cooling systems would
              be an obvious component in inland siting. Perhaps other systems fueled by renew-
              able sources (e.g., solar, wind) might evolve under the constraints of non-coastal
              siting.
                      The attempt throughout development of.thi@s policy option has been to
              stress the major implications that a program of energy facility and coastal access
              exclusion would involve. The orientation of such an approach is the future
              preservation of the unique resources of the coastal zone. While the approach in
              totality may be extreme and possibly would not comply.with the provisions of the
              Coastal Zone Management Act, certain aspects of this option may-be adapted within
              the CZM programs. The presentation of this option of total exclusion represents
              an effort to consider the full range of policy choices for the CZM programs.

                      b. Exclusion of All New Facility Development from the Coastal Zone
                         Management Area, but AllowinR Coastal Water Access, Related
                         Fuel Transportation, and Product Transmission through the Coastal
                         Zone

                      This general option excludes the major negative environmental impacts
              associated with energy facilities-in the coastal zone, whileallowing  access to
              the most coastal-dependent features such as cooling water and fuel delivery, and
              providing corridors for transmission of.products such as electricity and oil back

              into the coastal zone.

                      In the following discussions of each option and, its implications,
              references,will be made to various types of access corridors and rights-of-way.
              These would include utility corridors and rights-of-way for transmission lines,
              cooling waterpipelines, and for fuel.and product conveyance, including coal and
              oil transport by pipeline, conveyor,.barge, or rail. It is assumed that any
              necessary acquisition of corridors or rights-of-use would be accomplished through
              a fee simple purchase or a granting of easement where feasible.
                      It is felt that the above general option is viable under the guidelines
              of the Coastal Zone Management Act because the exclusion of facilities from the
              coastal zone is neither complete nor arbitrary in view of the limited coastal
<pb n="448" />

                                                  429

          resources under consideration.: Furthermore, exclusion of these resources-from
          facility development would allow flexibility of planning by state CZM programs
          for potential uses of higher priority.

                       (1) Limit Expansion or Conveyance   of Construction of'Coniveyance
                            Systems to Existing Corridors  and-Rights-of-Way
                  ILn2lications. Where feasible, this option would.limit expansion of.
          conveyance and development of conveyance systems to those corridors,presently
          owned and developed for such  uses, such as railroads, transmission lines, and
          pipelines.

                  The primary intent and implication of this option would be to limit
          further commitment of coastal land resourcesto development of new,access routes,
          while at the same time concentrating those environmental impacts associated with
          access routes (such as the above ground aesthe;tic intrusions and effects on.
          adjacent property Values and uses) along presently developed corridors..,
                  Restriction of future development to existing corridors would have.an
          effect on conveyance capacity as well. In those cases where present capacity-of
          pipeline, rail, transmission line, or barge conveyance is not being fully .
          utilized, expansion of conveyance could conceivably take place without.construc-
          tion. In-those cases where existing conveyances-are at    full capacity, it might
          be possible to construct higher capacity systems on the   same corridors. Finally,
          in those areas where existing corridors could support no-further expansion, in
          capacity, a necessary limitation on transportation and transmission capabilities
          would result from this option.
                  If this option were implemented, it is possible   that-inland siting of
          energy facilities would be limited to those areas closest to@the existing-
          conveyance corridors, depending, of course, on the relative transportation costs
          outside the coastal zone. Concentrated conveyance use along existing corridors
          could result in an overall decrease of operation and maintenance costs, especially
          in cases where existing capacity can.be utilized without:new construction. In.the
          case of below@ground transmission lines'and pipelines, concentration of such
          facilities may involve strict control of above-ground land uses to provide for
          adequate access and maintenance. This latter-possibility may involve fewer

          aesthetic or economic effects.
<pb n="449" />

                                                       430

                           (2) Avoid Areas.of Particular Concern in Determination of Access
                                Routes and Rights-of-Way
                       Implications. Areas of particular concern would include those areas
              designated by the state CZM programs according to the guidelines of the CZM
              regulations. Examples are areas of unique habitats, high natural productivity,
              substantial recreational value, significant hazard, etc. The implication of such

              an option would  be to encourage preservation of and restrict use of such     areas
              by siting access routes and conveyance corridors elsewhere or in such a way as to
              avoid them. In cases where the state would designate so many areas of particular
              concern that access through the coastal zone would be difficult, a limitation on
              conveyance ca pacity would result.

                           (3) Disperse New Access Routes and Corridors
                       Implications. A dispersal of access routes and conveyance corridors
              wou Id presumably result in a corresponding dispersal of the environmental and
              economic costs and benefits associated with the specific conveyance. For
              instance, aesthetic impacts such as noise generated by rail traffic might be
              ldssened due to dispersal of tracks. Likewise, economic benefits and costs
              derived from construction and maintenance of dispersed conveyances would,be
              spread out over a larger area.
                       Increases in land requirements due to dispersal within the coastal zone
              would increase acquisition costs and at the same time remove land from other or

              previous uses. Additionally, inland facility siting would tend to be dispersed,
              corresponding to the water and fuel access dispersal.

                           (4) Concentrate Access Routes and Corridors

                       Implications. This option takes the opposite tack from the previous

              option,  but the implications fall into the same categories. *Also, this option
              differs  from option (1) by permitting new access and corridors in addition to
              existing access and corridors. Concentration of access routes      and corridors  would
              result in a corresponding concentration of environmental/economic impacts in
              specified areas. This in turn would confine impacts to the specified areas,
              while not further affecting other areas. In addition, economic benefits and costs

              associated with construction of new access facilities would be concentrated. .
              The less even distribution of new access facilities along the coastal zone would
              permit the use of other lands for other existing or future uses. In conjunction
<pb n="450" />

                                                   431

           with this, concentration of access routes, a corresponding clustering of energy
           facilities inland might possibly result.
                   Land requirements related tS this option would be greater than in the
           case of restricting new development to existing corridors, but less than in the
           previous option of dispersal. Costs of.land acquisition would also in      crease.
           Finally, it is possible that the implementation of this option would have the
           overall effect of limiting transmission and transportation capabilities in the
           event that cost feasibility could no longer be justified.

                        (5) Specify Development Areas
                   Implications. This option would allow the-state CZM programs or        other
           state agencies to designate those areas which could be develop@_-d for access routes
           and conveyance corridors, thus facilitating long-range coastal zone planning.
           This option would blend well with option (2-),,' which suggests determination of
           -areas of particular concern, thus identifying those corridors which could be
           developed for access or conveyance with least negative impact on the remaining
           coastal zone. Additionally, the review and permitting process might be completed
           more rapidly, as these specified.areas would be more acceptable to the.reviewing
           agency, and therefore reduce in advance possible disagreement over the selected

           site.

                   This option would shift the responsibility of corridor site selection
           from the utilities to the planning agencies and potentially present problems.to
           the utilities in terms of their long-range expansion plans. Given the go-ahead
           to develop along specified.areas, the net result might be a concentration of
           facilities and their associated impacts. This should be foreseen and planned for
           in the initial specification of development areas.

                        6) Develop Buffer Control Areas
                   Buffer control areas here refer to zones bordering-either side of an
           access route or conveyance corridor that would reduce or contain the    Ivisual and/or
           auditory impacts of facilities such as railroads, transmission lines, conveyor
           .belts, or above-ground pipelines. This buffering effect might be accomplished
           by raised, landscaped mounds or.simply by retention of a natural green belt
           during development.
                   Implications. The  reduction of visual and auditory    impacts accomplished
           by the buffer zones would  be offset to a certain degree by    the increased cos'ts
<pb n="451" />

                                                     432

              to the developer (utility or railroad) of additional land requirement and land-
              scaping costs. This ratio of benefits and costs would be of a site-specific
              nature. Such a buffer zone might have a positive effect on adjacent land values

              and uses.

                      This option would effectively limit some uses of the land alongside the

              corridor such as industrial development or perhaps agriculture, but at the same
              time might provide increased public recreational areas where safety would allow.

                          (7) Develop Multiple-Use Corridors and Rights-cf-Way
                      In the development of new access routes or corridors, or in the expanded
              use of existing ones, provisions for multiple uses of the land could be stressed
              or required. This would be restricted to those uses that would benefit from
              long continuous stretches of access such as would be expected along rail lines,
              transmission corridors, or pipeline paths. Such uses might include recreation,
              such as hiking, or bicycle routes, or multiple facility uses such as combining
              transmission lines with pipeline paths or rail routes.
                      Implications. The intent and implication of such an-*option would be to
              increase the number of uses in a previously single-use facility route or corridor.

              This in turn would reduce demand on other coastal lands. Total land costs would

              be reduced for multiple users of rights-of-way, though construction and main-
              tenance costs might increase in the case of recreation development along rights-
              of-way. In the case of multiple conveyance use of rights-of-way, a combination
              of conveyances could possibly significantly increase the visual or noise impacts
              to the point of offsetting those benefits gained from multiple use. Finally,
              increased safety hazards resulting from increased public use of conveyance
              corridors would require appropriate safeguards.

                           (8) Establish Limit on Resource Utilization
                      Within this report, figures have been developed for the various resource
              requirements of different energy facility types. This option would specify the
              amount of land or water that might be used by energy facilities and thus limit
              the development or use of access routes or corridors through the coastal zone as
              determined by utility/CZM joint planning. This would probably require some form
              of legislation, regulations, or standards to facilitate implementation.
                      Implications. This option would encourage conservation of land resources
              in the coastal zone and prqmote land use that will be of higher priority as future
<pb n="452" />

                                                 433

          demand increases. By limiting the amount of land available for development of
          access routes and corridors, inland facility development would necessarily be
          controlled by capacity limitations of access routes or might be displaced to

          other coastal zone locations.

                  Limitations on water resource utilization would be intended to preserve
          coastal water quality and quantity for future use and development, as well as for
          futuredevelopment of the shoreline. A limit on water availability for cooling
          and other uses would result in reducti on or.displacement of water consumption and
          have impacts on water quality. It would likely encourage development of technolo-
          gies which use less water or return higher quality water to the environment.
          This, in turn, could increase the cost of using water.

                      (9) Provide Financial Assistance to Affected Areas for Impact
                           Assessment and Amelioration

                           (a) Impactassessment
                 'Implications. The intent of this option is to direct monies collected
          from the utilities or facility owners, or provided by the state or federal govern-
          ment, to the areas affected by proposed facilities for impact assessment. This
          would ostensibly improve initial assessment andaid identification of potential
          impacts early in the facilities planning stage by aiding local planning efforts.
          Additionally, this option would increase public involvement in both the planning
          and decision-making process.
                  In providing for local input to impact assessment, this might also result
          in an overall increase in time taken to reach decisions. Also, regardless of who
          provides the monies, planning costs will increase. Finally, the increase in
          money for local planning efforts would provide for added employment  in the impact
          assessment field, e.g., consultants or planners.

                           (b) Impact amelioration
                  Implications. Provision of monies for amelioration of impacts associated
          with energy facilities access routes would increase costs but also increase local
          benefits as a result of potential upgrading of environment in the vicinity of the
          facility in question. It would also obviate negative impacts,of access route
          development.
<pb n="453" />

                                                     434

                           (10) Use Technologies Requiring Least Land Area for Access Rights-
                                 of-Way
                       Implications. It is intended that this.requirement would result in
              preservation of coastal land for future higher priority use and development.
              This option would encourage both the use of existing technologies and development
              of new technologies that would require less land. Development costs might increase
              but land costs would decrease. Examples of such technologies might be coal slurry
              pipelines replacing short ha ul rail routes, or narrower or underground transmis-

              sion line requirements.

                       c. Inclusion of New Facility Development in the Coastal Zone Management
                           Area, Except in Designated Sensitive Areas in Which Additional
                           Development Would be Precluded
                       This set of options is designed to address the present status of energy
              facility siting, which places no geographical or locational restrictions on siting
              in the coastal zone., except in designated sensitive areas. These options are
              intended to maintain  the present policy of siting in the coastal zone management
              area but suggest possible limiting or restrictive policies which would enhance or
              preserve coastal resources for future use and development.
                       All facilities previously described in this repo .rt are included for
              consideration,', and the support materials regarding facility type descriptions and
              associated impacts serve as the basis for the option selections. The implications
              following each option are intended to look at the ramifications (intended or other-
              wise) of an option if implemented. Furthermore, it should be realized that these
              options are not presented for blanket approval and implementation. It is possible
              that they may be implemented individually or in combinations where feasible. It
              is equally possible that none of the options will be implemented as presented.
                       It is felt that this group of options represents a framework of potential
              policies that could be most easily implemented by the state CZM programs, short
              of doing nothing at all. Under the Coastal Zone Management Act and its amendments,
              the state programs will have management responsibilities, for those lands and uses
              of land having a direct and significant impact on coastal waters. The following
              options suggest various forms of management of new energy facilities in the

              coastal zone.
<pb n="454" />

                                                 435

                       (1) Limit Expansion or Reconstruction to Existing Industrial or
                           Utility Areas
                 'This option would prohibit Commitment of coastal  lands.and other resources
          to future energy facility development by restricting new  development or capacity
          expansions to those areas presently developed for such uses.
                  Implications. This option would require new electric generating units to
          be built on sites which.have already been developed for electrical generation,
          thus increasing productivity per unit of land without increasing land requirements.
          Presently, large tracts of land are developed for generating facilities with only
          a small percentage of this land being utilized for the generating plarit (see
          facility descriptions on coal and nuclear facilities), allowing for potential

          expansion.
                  Those environmental/economic costs and benefits associated with facility
          development would be concentrated at existing sites as a result. However, many
          of the negative environmental impacts associated with site  preparation would be
          avoided and associated costs would be less also. Some environmental impacts of
          operation and maintenance woul .d be concentrated and thus furtherdegrade the
          quality of the existing site. Economic benefits would be restricted to specific
          areas of previous facility development.
                  In cases where existing energy facility sites could not technically
          support further expansionj generating or refining capacity would be displaced to

          other or non-coastal sites.

                      (2) Avoid Areas of Particular Concern, Including Sensitive Areas
                  Areas of particular. concern would include those areas designated by the
          state CZM programs according to the guidelines of the CZM Regulations. Examples
          are areas of substantial recreational-value, significant hazard, and great
          sensitivity, such as areas of  unique habitats and high natural productivity, as

          well as others.

                  Implication@L. This option would preserve applicable  coastal resources for
          future development possibilities and provide for protected environmental preserves.
          It would restrict facility siting in the coastal zone, intensify competition for
          remaining coastal areas between energ y facilities and other uses, and could
          ultimately promote inland siting in those cases where remaining coastal lands are
          not sufficient or satisfactory for energy facility development.--
<pb n="455" />

                                                      436

                           (3) Encourage Development of Dispersed Siting.
                       Implications; Dispersed siting of new energy facilities or a deliberate
              spatial  distribution of new developments would tend to disperse environmental
              impacts  and at the same time increase systems reliability.
                       This option also would have the effect of increasing construction and
              fuel transport costs'as distance from load centers increased. To offset long
              distance transportation costs it is entirely possible that an increase in

              development of fuel transshipment facilities would result. Economic costs and
              benefits associated with facility construction and operation would be more evenly
              distributed but would increase or decrease depending on the site specifics.

                           (4) Encourage Multiple Unit/Single Site Development
                       This option would allow development of new areas of coastal land, but in
              amanner,that would obtain the highest energy production per unit of land.
                       Implications. It is felt that implementation of this option would have
              the effect of reducing land requirements, therefore preserving coastal lands for
              future use. It would reduce de-Velopment costs per unitlof energy and would

              reduce transport and transmission costs.
                       As with the first option in this  section, this option would tend to
              concentrate th-elenvironmental/economic costs and benefits in specific areas.

                           (5) Specify Development Areas
                       State CZM programs, in addition to  designating areas of particular concern,
              would specify those areas, including energy resource areas, remaining in the
              coastal zone where facility development would be permitted.
                       Implications. Ideally, this would provide the coastal   zone planning-
              agency with some control of the degree of concentration of facilities    and their
              impacts. In addition, it would facilitate future coastal zone land use planning.
                       Adoption of this option would remove some control of,the site selection
              process from the utilities and shift the burden of planning to   the state CZM or
              other planning agencies. Because of the intricate nature of suitable site
              selection for such facilities as nuclear and coal.-fired power plants, an expansion
              or addition of necessary expertise within these agencies would be required.'
              Hence, there would be an employment benefit, but this would be offset by the
              increase in costs.of this added responsibility.
<pb n="456" />

                                                 437

                      (6) Specify Facility Type and Size in the Coastal Zone
                  Based on their associated impacts, only certain types of facilities
         determined by the CZM agencies would be allowed to site in the coastal zone. An
         example of this would be to allow the coastal siting of nuclear plants with
         cooling towers rather than coal.-fired plants with once-through cooling. The
         intent here would be to specify a facility which does not commit large areas of
         land to coal and fly ash,storage and does not have significant entrainment/
         impingement'impacts on the lakes. This is only an example and does not indicate
         a preference.
                  Implications.  This option-, if implemented, would provide for control of
         the type and scale of,i'mpacts to be permitted in the coastal zone. Because of
         the extensive planning required to determine what impacts will and will not be
         acceptable', an increase in cost of planning programs is foreseen. Likewise,
         development costs and associatedplanning problems wou    ld increase for the facility

         owners.

                      (7) No  Restrictions on  Facility Type  and Size in the Coastal   Zone
                  This option, whilelassuming-that present environmental standards will be
         maintained, provides for no further siting restrictions or controls with regard
         to the-coastal zone.
                  Implications. The intent of this option would be to promote the most
         rapid and inexpensive development of energy facilities per unit of production and
         capacity. This would allow the utilities to.more readily I'meet America's growing
         energy needs.

                      (8) Give Coasta:l Development Priorities to Energy Facilities
                  This option would give,first priority.to energy facilities in the develop-
         ment of coastal.lands. In other words, if a tract of land might be available for
         an auto plant development or a refinery, under this option the refinery would be
         given priority by the,state CZM program.
                  Implications. Implementation ofthis option would provide for lower
         cost energy production by facilitating utility access to fuel and water resources.
         This would also encourage lake transportation   of fuels and promote expansion of
         harbor and transshipment facilities...
                  In.addition, this option would reduce coastal land and other resources
         which might be used for other development. Facility impacts on the coast would
<pb n="457" />

                                                         438

                 increase, e.g., thermal loading from c6oling'water, aesthetic intrusions of
                 transmission lines, and increase in construction employment. This option would
                 .,increase coastal zone transmission capacity requirements. in areas devoid of
                 previous development.

                             (9) Site   Close to Existing Transshipment Facilities
                         Implications.   The intent of this option would be to decrease costs and
                 negative environmental  impacts associated with the transportation of fuels within
                 the coastal-zone. Land committed to these conveyance systems would be reduced as
                 well. This option would limit sitingalternatives, depending on.the number or,
                 variety of transshipment facilities in existence. The merit of this option would
                 depend also on the relative location of the transshipment facility to major
                 transmission systems. In some cases, higher cost of transmission would offset
                 fuel transportation cost savings.
                         Expansion of existing transshipment facilities might necessarily,follow,
                 as generating plant fuel "demands  increased in a concentrated area. This cluster-
                 ing of plants in the vicinity of   transshipment facilities would concentrate those
                 economic benefits and environmental costs as well, resulting in either a financial
                 shot in the arm for the local community or an environmental eyesore, depending
                 on the quality of planning.

                              (10) 'Locate in Proximity to Existing Electric   Power Grid
                         The elect-Oic power grid  is the network of extra high voltage (ehv) trans-
                 mission lines used for regional   distribution of electricity. The intent of this
                 option in contrast to the preceding one would be to site close to the transmission
                 system to reduce construction and maintenance costs of new tie-in lines.
                         Implications. This would reduce those environmental and economic impacts

                 associated with the construction and-maintenance of-new transmission lines

                 required to tie distant'generating facilities into the power grid system. This
                 would increase the cost of fuel transportation and water conveyance in those
                 .cases where the existing power grid was not near the coast. Siting alternatives
                 would necessarily be limited as a result of this option, and in some cases
                 capacity of existing systems might have to be increased to handle new generating

                 demands.,
<pb n="458" />

                                                439

                     (11) Assign Priorities for Facility Development to Those Facilities
                           Employing By-Product Utilization
                 By-product utilization includes use of waste heat from generating plants
         for.industrial processes, mixture.oj@ fly ash with asphalt, utilization of thermal
         discharges for mariculture, and others.
                 Implications. This would reduce the local negative environmental impacts
         associated with fuel utilization, such as air pollution, waste storage, and,
         cooling discharges, and at the same time promote efficient use of resources. By
         prioritizing siting, an incentive for development of by-product utilization would
         be established. Operating costs would   be reduced overall because of more
         efficient utilization of primary fuels.
                 Development costs would necessarily increase in order to make these.by-
         product usages technically and economically feasible. Symbiotic siting of
         generating facilities and industrial users of by-products would result in concen-
         tration of enviro.nmental/economic impacts in specific-areas.

                     (l2) Develop Buffer Zones
                 As specified,in the second set of options, buffer zones are areas designed
         to reduce or contain aesthetic intrusions.@associated with energy facilities.
         Examples might be green belts surrounding refineries, preservation of natural
         areas around power plants, or vegetated berms around coal storage areas.
                 Implications. Development of   buffer zones would reduce visual, auditory
         and other impa:cts on the human senses which may be undesirable. Green belts.have
         been-shown to naturally filter out some types of air pollution. In some cases,
         increased recreational use may accompany development of  buffer zone areas.
         However, usessuch as industrial development would be restricted. Costs of
         developing these buffer zones would fall on the-owners of the energy facility
         contained within and therefore raise the,cost of the facility overall.

                     (13) Maintain or Increase   Public Access to the Shoreline in the
                           Event that a Facility's Property has Shoreline Frontage
                 Under this option the new facility owner would include plans for public

         access,to shoreline areas if his property includes shoreline.
                 Implications. Ideally, this option would provide for increased public

         access, to scarce shoreline areas for uses such as.recreation. This would in

         effect shift some of the burden of public access  acquisition and development from
         state and local agencies to utilities and facility owners. Development costs
<pb n="459" />

                                                        440

              .would increase for the utilities, but these might bepassed along to the

                consumers.

                        There might-possibly be restrictions to this option    in the case where
                safety regulations would not allow such activities (i.e., nuclear safety
                exclusion zones).

                            (14) Establish Restrictions on Cooling Type

                                        This option would provide stricter controls on those
                environmental impacts associated  with condenser cooling methods. The environ-
                mental control and planning agencies, rather than   the utilities,  would select
                'cooling systems and would decide which type would  be most desirable in the
                coastal zone. This might result in a deci   sion to ban flow-through cooling
                because of negative effects on aquatic life, or a   ban on cooling ponds because
                they require.lar  ge  amounts of 1and area. Finally, the costs to utilities to
                implement these prescribed  cooling types might be so restrictive as to encourage
                inland sit ing.

                          ..(15) Adopt Air and   Water Quality Standards Compatible with Coastal
                                   Siting
                        This option would allow  the state CZM programs to suggest stricter
                environmental standards for en ergy facility operation in the coastal zone.
                        Implications. The   thrust of this option would be to improve air and
                water quality, or at least  prevent further degradation of coastal environments.
                This option would increase  costs of environmental controls, and in cases where
                these costs would be prohibitive, discourage coastal siting. It is entirely
                possible that adoption of stricter environmental standards for the coastal zone
                would result in a favoring of those facility types.which most easily meet the
                new standards-. However, as noted in Section III.B.l.d. of this report, the
                states may not be able to.adopt stricter (or more lenient) environmental s    tan-
                dards"specified only for their coastal zones.

                            (16)   -Provide Financial Assistance to Local Areas for Impact Assess-
                                   ment and Amelioration

                                   (a) Impact assessment
                        Implications. Similar to option (9)(a) in the second grouping, this would
                provide monies to the area affected by a proposed facility to aid local planning
                agencies in initial, identification of potential deleterious impacts. This would
<pb n="460" />

                                                 441

          increase public involvement in the  planning process and decision making. This
          might also increase the time required for decision making. Increased employment
          in the planning and consulting field would result,from these monies, but these
          planning costs would have to be met elsewhere.

                            .(b) Impact amelioration
                  Implications. Monies allocated for this:purpose would obviate negative
          impacts of energy facilities@and may in the long run increase benefits''to.,a local
          area due to overall increases in enVironmental,or economic quality.

                       (17) Permit Shoreline  Site Location of Energy Facilities
                  This option would permit the location of power plants and refineries next
          to or near the shoreline, as well as permit the use of.coastal resources. Unless
          shorelines are presently zoned for other uses, this option is essentially the

          status quo.
                  I lications. This option would result in shoreline use for energy
          facilities, thereby precluding its use for other major development or conserva-
         ..tion purposes. However, with proper-planning, other uses could be accommodated
          in some areas of the energy facility site. The development Of the land near
          shorelines and its use for energy,fac.ilities might possibly induce local shore-
          line damage. By competing.with other possible.uses of the shoreline, energy
          facilities development of the shoreline might increase its value and local land
          acquisition costs. The presence of an energy facility next to or near the shore-
          line may also affect adjacent land'values and uses. By doing so, commercial-
          industrial development of the shoreline,may be encouraged,.possibly discouraging
          other uses of neighboring  shorelines. Related to theseconsiderations are the
          visual-aesthetic effects  of large facilities on the shoreline.
                  An advantage of shoreline-or near shoreline location.is that docking
          facilities might be developed.for water transportation of fuels.and other
          materials, if water transportation is-less expensive. Shoreline.location would
          also provide ready access to water for cooling or other plant processes.

                      (18) Sp ecify Shoreline Setback Distance  for Energy Facilities
                  Under this option,a setback distance for energy   facilities would be
          required. The setback distance could vary depending on the location and local
          conditions and characteristics.. The setback requirement could be established
<pb n="461" />

                                                      442

               by local ordinance or by legislative action.   Such a requirement could affect
               fuel storage areas for docking facilities, but not the docking facilities.them-
               selves. This option would not be intended to affect access to coastal resources
               for the facilities discussed in this report.
                       Implications. By specifying a setback distance for energy facilities,
               the integrity and aesthetic qualities of the shoreline would be preserved. This
               option might increase multiple use of shoreline property if public access were
               permitted; i.e., the property could be used for access to coastal res ources and
               for recreation. A required setback distance for energy facilities would increase
               capital and operation costs for a pipeline and pumping station, particularly if
               once-thr6ugh cooling is used and/or the increase in elevation is large between
               the water-source level and the plant. Additionally, if fuel or products are
               received by water transportation, transportation.costs of these materials would
               be increased. For a discussion of these increased water provision and transpor-
               tation costs, the reader is referred to Sections IV.A.5.b.(l).(a) and (b) of this
               report. The use of a setback distance might also affect adjacent development
               along the shoreline as well as development behind the setback distance. For
               example, the setback line might preserve shoreline for natural or recreational
               uses on the property affected as well as encouraging such uses on adjacent areas.
               This situation may influence adjacent land values also. Behind the setback.line,
               commercial-industrial as well as residentialdevelopment might cluster, depending
               on provision of roads and utility services.
                       The use of a setback distance might  also encourage companies and govern-
               ments to purchase property for energy facilities that would not hav .e property
               frontage on the shoreline, as long as resource access was available, such as
               through the purchase of.an easement.
                       With respect to the distance considered for setback, a 1000-foot setback
               for the plant and appurtenances might be similar to not having any setback require-
               ment at all. This would be particularly true in the case of aesthetic and shore-
               line,use effects. A setback distance approximately 1/2 to 1 mile might be more
               beneficial from the aesthetic and shoreline use standpoints, but would involve
               some incrementing water provision costs and possibly transportation costs.
               However, as in the case of the Pleasant Prairie facility in Wisconsin, an inland
               location may be advantageous to tying in to the existing transmission system.
<pb n="462" />

                                                   443

                       (19) Permit Only Those Facilities     Absolutely Requiring Shoreline
                             Location to be Located on or    Near the Shoreline
                   This option would necessitaie some kind of legislative action at the
          local or state.1level. It would be similar to zoning areas for particular uses;
          in-this case, zoning certain shoreline,areas for particular energy facilities
          which absolutely require a shoreline location. Under thisopt       ion, energy facili-

          ties would still have access to coastal resources.

                   Implications._ This study,has not identified any energy facilities,
          except docking and transshipment facilities for water transportation,, which
          absolutely require shoreline locations. This option would permit areas-along
          the shoreline to remain in existing use or to be used for'..other.purposes;, rather
          than be used for energy facilities. Considerations for shoreline location should
          emphasize economic as well as environmental factors. Inland locations in some
          areas may result in significantly greater economic costs which may not be
          warranted, even when compared to the environmental effects. Thus, this approach
          would have to be used on a case-by-case basis, and yet applied stringently enough
          to have a recognizable effect   on shoreline uses. This option might place
          considerable emphasis on a state-required environmental.re'port on energy facill-
          ties, an approach already adopted by some Great Lakes states. Other implications
          such as effects on shoreline and inland development,@tie-in to the transmission
          system,,, and water provision and transportation costs would be similar to technical
          option (18) above.

          D. SUMMARY

                  The institutional and technical    policy op'tions provide a broad range    of
          directions that the states and their coastal zone management programs might         take.
          The options in the various categories serve to highlight the many possibilities
          for: (1) developing new institutions to address the current and complex problems
          related to energy facilities siting; (2) utilizing existing institutions with new
          or expanded arrangements among them and, in some cases,      additional responsibili-
          ties; (3) developing financial approaches to assist the companies and governments
          involved in energy facility siting; and (4) developing technical, environmental
          and economic approaches to locating energy   . facilities with respect to the coastal
          zone management area and the shoreline. Particular emphasis was given to
         .integratingthese options with state coastal zone management progr       ams. Selection
<pb n="463" />

                                                     444

               of some options within certain categories ne cessarily precludes choosing other
               options within or among the categories. For the most part though, the selection
               of combinations of options in various categories is unrestricted. Individual or
               collective decisions by the states and their CZM programs regarding well-defined
               policies for review and examination of guidelines for energy facility siting may
               assist the utility companies and other energy-related industries in theirshort
               and long range planning for facilities.
<pb n="464" />

                                                445

                                            Chapter VII

                                     SUMMARY AND CONCLUSIONS

                  This study covers several broad subjects related to energy facility
          siting in,a manner that should be useful to the Great Lakes coastal zone manage-
          .ment programs. Some general conclusions from this study can be made in each of
          the major areas of analysis.

          A. INSTITUTIONAL CONSIDERATIONS

                  At present, four of theeight Great Lakes states (Minnesota, New York,
          Ohio, and Wisconsin) have instituted concerted and fairly well defined site
          selection processes for electric generating facilities. However, these states have
          not addressed to a significant degree the selection of sites for other types of
          energy facilities.  The four remaining states have only limited involvement in the
          regulation of sites for all energy facilities, and have concentrated primarily on
          the certification of a proposed facility with respect to compliance with standards
          for air, water and land resource protection. In all Great Lakes states, policies
          to guide the siting of energy facilities in the coastal zone are in the early
          stages of development.
                 The authorities of several federal agencies, notably the Nuclear Regula-
          tory Commission and the Environmental Protection Agency, will have a significant
          influence on energy facility siting. The policies, standards and guidelines of
          the EPA for the protection of air And water resources define aframework within
          which other agencies or interests of the public and private sector may operate.
          The greatest federal impact on future selection of sites for energy facilities
          will'probably be through the Coastal Zone Management Act of 1972 and its 1976
          Amendments. Several.provisions of the Act deal with energy facility siting.
<pb n="465" />

                                                    446

              With respect to incorporating energy facility siting policies into a comprehen-
              sive program for coastal zone management, numerous institutional options are.
              available to the states.

                      The Coastal Zone  Management Act allows the states considerable freedom in
              the development of plans  and in the establishment of programs for the management
              of their coastal zones.   The mere fact that such.plans and programs are being
              developed, that they will  be reviewed and approved at the state and federal level,
              and that subsequent actions must be consistent with such plans, will introduce
              a measure of comprehensiveness and coordination to energy facility siting as well
             ,as to the entire process of resource management for the coastal zone. The
              requirement for a planning process for energy facilities in the Great Lakes states
              coastal zone management programs provides.the foundation for energy facility.
              siting programs that address and emphasize the problems and opportunities of energy
              facility siting in the Great Lakes coastal zone.

              B. TECHNICAL CONSIDERATIONS

                  1. FACILITIES SITING AND COASTAL DEPENDENCE

                      The major types of energy facilities included in this study--fossil-fuel
              and nuclear power plants, coal and oil transshipment facilities, and refineries--
              were described and their particular site and resource requirements discussed. In
              addition, a discussion of their major environmental and economic impacts were
              presented and a framework for analyzing these ','activity impacts" suggested.
              Finally, an analysis of some of the major cost components was given. Based on
              this material, a description of the coastal dependent, or nondependent, aspects
              of facility siting was presented. The major conclusion drawn from this analysis
              is that, like so many other siting factors, the degree of coastal dependence
              exhibited by an energy facility is a function of the facility type, the geographic
              area within which it is to be located, and the availability of alternative sites.
              In addition, certain facility types--refineries, fuel transshipment facilities,
              and coal conversion facilities--are not expected to have a major impact-in the
              Great Lakes coastal zone during the period considered in the study.
                      It can generally be concluded that an electrical generating facility does
              not require a location on or near the coast. However, certain aspects of the

              facility, such as cooling system and water provision, mode of fuel supply, local
              geological and topographical conditions, meteorology, location of the existing
<pb n="466" />

                                                 447

           transmission system, may make a coastal site more or less favorable than an
           available inland location. An evaluation of this degree of coastal dependence
           should be carried out for each proposed facility so that it can,be compared to
           other, less displaceable, uses of the Great Lakes coastal zone.
                   The following general conclusions can be sited with respect to the
           coastal dependence of power plants:
                   e Facilities using once-through cooling must be located on or near the
           shoreline because of substantial inland transportation (pipeline) costs of water

           provision.
                   e  Facilities using closed-cycle cooling are less dependent on locations
           on or near the shoreline than are facilities using once-through cooling, assuming
           all other factors to be approximately equal. Site conditions will determine the
           type of closed-cycle cooling system used. However,,the further inland a facility
           is located, the greater are the construction (capital) costs for water provision
           and blowdown pipelines.
                   0 For facilities using closed-cycle cooling, the cost of locating on
           the shoreline versus the cost of locating inland are essentially trade-offs
           between construction and operation costs for transmission lines, water supply and
           cooling facilities, facilities for delivery and handling of fuels, and other
           supplies, and disposal of waste material.
                   0 Nuclear facilities require very large and massive components, which in
           most cases are delivered by water transportation. However, rail or road.corri-
           dors of adequate width and load-carrying capacity can be utilized for delivery of
           these components. If these rail or road cooridors are not available to potential
           sites, the location of nuclear facilities may be more dependent on shoreline or
           near shoreline locations. In any event, field assembly is becoming more.common,
           thus possibly negating some of this shoreline dependence. Otherwise, nuclear
           facility coastal dependence-considerations would be those in the previous

           conclusion.

                   The coastal dependence of fuel transshipment and storage facilities and

           refineries can be summarized as follows:
                     Fuel (coal and oil) transshipment and storage facilities   receiving or
           shipping their commodities by water must locate near the shoreline,  although.
           storage areas do not have to be located on the shoreline. Storage   area location
           is highly dependent on industrial needs, future transportation requirements, and

           onsite and offsite use of stored fuel.
<pb n="467" />

                                                     448

                       e Refineries are not coastal dependent, but do need water for processing
               and cooling. Coastal dependence for-water supply and wastewater disposal consid"
               erations is decreasing due to increased water recycling. Air cooling is also
               decreasing refinery dependence on easy access to water. Refinery location
               decisions are increasingly becoming market oriented, with decisions being made
               on a national basis, due to,the existence of the national product distribution

               pipeline.
                       The degree of coastal dependence exhibited by a proposed energy facility
               of a type discussed in this report may vary from nonexistent or slight, to very
               strong or complete, depending on a range of site and facility characteristics.
               In light of the limited, and in some cases unique, coastal land available in
               the Great Lakes Basin, an evaluation of the best use of the coastal land should
               be included in a site selection or approval process. In this way, use of the

               Great Lakes coastal zone can be reserved for those uses least suited to inland

               locations., While this may include energy facilities in some cases, it will
               ensure that a more comprehensive view of coastal development is taken.

                   2. ENERGY CONSUMPTION AND MOVEMENT

                       Intensive energy consumption in the Great Lakes Region is facilitated by
               the availability of an abundant fuel-resource, proximity to major water resources,
               and the unique transportation system afforded by the Great Lakes.
                       Extensive coal resources in the nearby.Appalachian and midwestern regions
               supply the bulk of the fuel for generating electricity.in the Great Lakes states.
              @Oil, a very versatile fuel, has less application historically for the generation
               of base load power in the Great Lakes Basin. However, the-broad and diverse end-
               use of oil make it crucial to the region's energy needs.
                       The waters of the lakes are also a source of hydroelectric power for the
               region and a heat sink for the.nuclear and fossil fuel power plants that line the

               coast.

                       Transportation of fuels to these plants is facilitated by low-cost water-
               borne movement on the lakes. The patterns of fuel traffic through the region
               arise from a complex relation among costs, reliability, and legal regulations.
                       The arrival of low sulfurwestern coal on the lakes has marked a change
               in the prevalent upbound traffic pattern of this commodity., Long-term investments
               in this movement assure continuation of,a new pattern. Complementing.and.competing
               with lake movement of coal is the extended use of unit train coal transport.
<pb n="468" />

                                                     449

           Unit train movement typically runs directly from the mine to consumer. Litiga-
           tion by the lake carriers is presently seeking for Great Lakes ports the lower
           ,unit train rates already available for other destinations.
                    Coal will continue to play a dominant role in the future fuel mix of the
           region. The preeminence of this fuel will depend largely on resolving many of
           the unanswered questions that presently plague the development of nuclear energy
           facilities. The use of coal also depends on adjustments of air quality stand-
           ards or improvements in combustion/air quality control technologi      .es.
                    New generating capacity is not planned or scheduled to be in       service by
           1984 in the coastal counties of Illinois, Minnesota or Pennsylvania.         The combined
           planned and scheduled additional electrical energy generating capacity for the
           entire Great Lakes states area through the mid-1980s is 74,067 MWe, with 19,433 MWe

           to be located in the Great Lakes coastal counties. (A state-by-state analysis is
           presented in Chapter VI, Technical Considerations--Energy Consumption and Move-
           ment in the Great Lakes Region.) Of this.19,433 MWe of additional capacity by
           1984, 28 percent will be coal-fired (Michigan, New York and Wisconsin), 12% will
           be oil-fired (Michigan and New York), and 60% will be nuclear (Michigan, New York,
           Ohio,'and Indiana)-.

               3. REGIONAL SCENARIOS OF ENERGY,    DEVELOPMENT

                    Regional scenarios of energy    development (principally electrical energy
           generation) were prepared to develop      a perspective on potential resource impacts
           of siting new energy facilities in the Great Lakes coastal zone. The scenarios
           are based on different fuel mix.assumptions. The four scenarios with their

           respective fuel mix assumptions are:
                    e Scenario I, Recent Trends--50% coal, 35% nuclear, 15% oil, gas and
           hydroelectric
                    o Scenario II, High Coal--70% coal, 15% nuclear, 15% oil, gas, and hydro-

           electric

                    9 Scenario.III, High Nuclear--45% coal, 45% nuclear, 10% oil, gas,         and
           hydroelectric
                    o New Technologies--40-50% coal, 20-35% nuclear, 15-20% new technologies
           (solar, wind, fluidized bed, etc.)
                    In developing regional resource requirements for land, water, and fuel
           (coal),  these scenarios were applied to a range of electrical energy demand growth
           projections (3%/year, 5.5%/year, and 8%/year), an assumed mix of generating
<pb n="469" />

                                                       450

               facilities (75% base load, 20% intermediate load, and 5% peak load),'and an
               assumed capacity load factor (65%). The resource requirements of the generalized
              @facilities (coal-fired and nu  clear power plants) were then applied to these
               assumptions to evolve the regional resource    requirements of energy development.
                       For the purposes of this study, a three percent growth rate per year'in
               electrical energy consumption was assumed to be a lower bound in projecting
               future power plant development, given present uncertain circumstances. Actual
               growth in the future may be considerably higher or somewhat lower. These situ-
               ations are not disputed or argued. This 3% growth rate will then describe the
               minimum amount of resources required to meet future electrical energy consumption,

               as shown in Table 79.

                                                  TABLE 79

                 ADDITIONAL RESOURCE REQUIREMENTSOF THE GREAT LAKES STATES, 1975-1995
                                    SCENARIOS AT 3%/YEAR GROWTH RATE IN
                                       ELECTRICAL ENERGY CONSUMPTION

                            Additional                                 Scenarios
                           Requirements
                             (1975-1995)                   1             11            111

               Nuclear  (units)                            70            24            104
                 land (acres)                           46,725         16,020         69,420
                 water (gpd)
                    once-through                      1,008 x 10 8     346 x  108 1,498 x 10 8
                    closed-cycle                      1,512 x 10 6     518 x  106 2,246 x 10 6
               Coal (units)                                40            96              12
                 land (acres)                          16,000          38,400          4,-.800
                 fuel (millions   of tons per year)        80          192               24
                 water (gpd)
                    once-through                        403 x 10 8     963 x 108     121 x 108
                    closed-cycle                        576 x 10 6   1,382 x 106     173 x 106

               Requirements,under Scenario IV, New Technologies, is assumed to be about 80%,of
               those in Scenario I, Recent Trends, due to a postulated reduced dependence on
               more conventional generation technologies.
<pb n="470" />

                                                          451

                      Assuming an 8%/year growth rate, Scenario I, Recent-Trends, projects an
         .":additional 238 nuclear units and 185 coal units neededi with land requirements
                                                                        8
            of 233,000 acres, water withdrawals"of 5,292 x 10 gpd for once-through cooling
                             6
            or 7,805 x 10 gpd for closed-cycle cooling, and coal              requirements of 370 million

            tons per year.
                      Table 80 shows    the general projected resource        requirements (assuming a
            50% coal/50% nuclear fuel mix for additional capacity             between 1975 and 1995,
            which is an approximate average.of the four scenarios) that were developed,for
            the Great Lakes coastal countie's on the basis of an analysis of the scenarios
            ..and each state's energy development-

                                                    TABLE 80

                           ADDITIONAL RESOURCE REQUIREMENTS OF THE GREAT LAKES
                                        COASTAL COUNTIES, 1975-1995,
                      ASSUMING A 37. GROWTH RATE IN ELECTRICAL ENERGY CONSUMPTION

                                                      Additional Requi ements
                                       Generating                            Water                  Coal
                        Generating       Capacity      Land         Withdrawals (gpm)           (Millions of
             State         Units*          (MWe)       (Acres)      'Once-        Closed      Tons per year)
                                                                   Through         Cycle

            Illinois                                    ---          ---            ---                ---

            Indiana
            Michigan          11            11,000     5,870     9.35xlO'6         137,500             11.0
                                                                              6
            Minnesota        1-2.         1-2,000      1-2,000   0.9-1.7XIO       12-25,000          2-4.0
            New"York          7             7,000       3,740    5.95xlO 6          87,500             7.6
            Ohio                            4,000       2,135    3.4xlO 6           50,000             4.0

            Pennsylvania     ---                        ---          ---            ---
            Wisconsin         8             8,000       4,'270   6.8xiO 6          100,000             8.0

              Coal and mclear units,        assuming a   50%  coal/50%'nuclear     mix, as   noted above.
              Does not include Bailly       nuclear unit, Porter County, on        site already containing
              two coal-fired units.
<pb n="471" />

                                                      452

                       if an 8% growth rate is assumed, the figures in the table above would
               increase by factors ranging from 2.0 to 4.8, depending on the state. This
               indicates that considerable pressure might be placed on'the coastal counties of
               Great Lakes Basin for electricalenergy generation facilities.

                       OTHER CONSIDERATIONS

                       A host of other factors not addressed in.this report will    affect energy
               facility siting. Some of these factors involve economic and political circum-
               stances. The economic development and stimulation provided by the siting of an
               energy facility may be attractive to relatively less developed areas located near
               load or market centers,- In many cases,.utilities and industries already have
               purchased land in outlying areas. Such.development may.be more acceptable in
               these localities, and indeed, campaigns for the facilities may be undertaken..
               Thus, political factors.may influence the final location of these facilities.
             .-Such political-economic factors are difficult to examine-in an objective analysis
               of energy facility siting, and are beyond the scope of this study.
                          state energy policies relating to consumption,    rates,.construction and
               building r@equirements,,-and other factors will affect the.need for additional
               facilities and the types, of fuels to be used. Public reaction to the location
               of individual facilities..or types of facilities and energy use will have obvious
               effects on where facilitieswill be.located as well as when they will be
               constructed and placed  into operation.
                       The absence of  a federal energy policy is permitting public acceptance,
               environmental and market factors, and state policies to influence energy use and
               energy facilitysiting at the national level. The present national energy policy
               is thereby made up of these subsets of policies which affect each other but are
               developed separately. While these factors and subsets of energy policies must
             ,be incorporated into a federal policy because of their,importance, there is no
               consistency or coherence among  them. On one hand, this,absence    of a federal
               energy policy does not lock the  country  into.energy.developments that may not   be
               advantageous in thelong run.. On the   other hand,.the lack   of a federal policy
               results in a piecemeal  approach to energy development, inconsistency in dealing
               with energy consumption and facility siting problems, and    confusion for utility
               and energy related companies as to future planning and investments.
<pb n="472" />

                                                 453

           C. POLICY OPTIONS

                   The institutional policy options described in Section VI.B. indicate
           the range of options available to'the states under the Coastal Zone Management
           Act, as well as other applicable federal and state legislation. An attempt was
           made, within the constraints of reasonableness, to mike the list as thorough as
           possible@ The options are structured to encourage  the reader to develop new
           options through permutations and combinations of those presented. Note that
           while special attention is given to matters related to the coastal zone, the
           options also address the broad issues of energy facility siting.on a statewide
           basis. It is important@to relate CZM-specific policy options to the institutional
           framework of,the.state as a whole, and to provide consideration of statewide
           energy facility siting regulation where such programs do not exist.
                   The technical options were developed within the limits of present or
          .probable technical feasibility to provide,as wide a range of choices as possible
           for future energy facility siting in the Great Lakes coastal zone. The technical
           options are not constrained by traditional and present institutional policies. This
           permits consideration of innovative siting options. Given the conclusions of
           the coastal dependence analysis, the state coastal zone management programs are
           encouraged to give strong consideration to the siting of energy facilities
           other than shoreline fuel transshipment facilities) inland from the shoreline,
           but with access,to coastal resources. The technical options suggest how this
           might be accomplished.

           D. IMPLICATIONS FOR FURTHER RESEARCH

                   During the course of this project, several topics were encountered for
           which there was a lack of available information or that were beyond this study.'s
           scope. Time-constraints precluded any extensive investigation of these topics
           by the study staff so they are offered here as suggestions for additional
           research. All have a bearing on the siting of energy facilities in the coastal

           zone.

               1. -LAND.VALUES

                   Attempts to compare coastal and inland sites for energyfacilities were
<pb n="473" />

                                                     454

              impaired,by a lack of information. on relative land values. Not only is,there a
              lack of data comparing actual land costs, but the intangible land values associ-
              ated with.aesthetic,. recreational and psychological aspects of the coastline
              also require additional investigation.

                  2. NUCLEAR FUEL CYCLE

                      Nuclear power plants require a variety of facilities for the enrichment
              ,of nuclear fuel and the processing and disposal of wastes.- While none of these
              facilities are currently located in the coastal zone of the Great    Lakes, some
              are nearby and others are proposed. The scope,of the study did not permit
              adequate consideration of the coastal,d.ependency of such facilities. The trans-
              portation of radioactive materials on the Great Lakes also requires additional
              @in.vestigation with regard to transshipment and storage facilities and the poten-
              tial hazard to the-lakes from radioactivity.,

                  3. MULTIPLE-USE SITING

                      The use of land for one purpose may not preclude all    other uses. The
              intensity of.land use in some coastal areas suggests that it    may be judicious
              for states to investigate the possibilities for multiple uses of lands, such as
              transportation corridors and the.shoreline, associated with energy facilities.

                      SYMBIOTIC  SITING.

                      The-waste  heat from a power.plant andthe heat    from incinerating
              municipal trash both offer opportunities for symbiotic    siting. Waste heat may
              be dissipated in  a beneficial, industrial application,  while trash may supple-
              ment other fuels  in the production of electricity or perhaps serve as the sole
              fuel. Practical   problems with implementation of such schemes require investi-
              gation.

                  5. CONSERVATION

                      While research is  underway into various methods of conserving electricity
              and other forms of energy, the potential for the mitigation of adverse impacts
              on the coastal zone could  be investigated.

                  6. OTHER FACILITIES

                      Coastal zone management plans and programs will.deal with a wide variety
<pb n="474" />

                                                 455

           of facilities and land uses. The'coastal dependency of these other facilities
           and uses could be investigated so *at a comparison could be made with the
           results of this report and the relative requirements for coastal access.among

           all land uses could be established.

               7. SMALLER SCALE FACILITIES

                   Although electrical generating'facilities were covered in detail in
           this report, a factor that may affect the construction of large generation facil-
           ities is the development of combined cycle generation. Research is being
           directed toward examining the use of combined' cycle generation for facilities (less
           than 150 MWe) that would serve small communities or neighborhoods and large
           individual industrial plants. Future pricing policies for electricity use and
           for natural gas may encourage their application. The use of smaller scale fossil-
           fuel powerplants '(other than combined cycle) should also be evaluated and
           compared to poss ible.use of combined cycle plants. The significance of the
           possible use of these facilities and their implications for future land, water,'
           air, and fuel use should be examined.

               8. DETAILED STATE POLICY ANALYSIS

                   A highly detailed analysis should be made of the policies, programs,
           and legal authorities within each state that significantly influence energy.
           facility siting in both coastal and inland areas. This greater level of detail
           is a logical spinoff from this study and. is a.necessary prerequisite for each
           state's'development of comprehensive institutional framework  to implement energy-
           facility siting policies and/or programs.

               9. RELATIONSHIP BETWEEN STATE AND FEDERAL POLICIES

                   Further research into a number of substantive areas of energy.policy  in
           the Great Lakes Basin is needed. A detailed analysis should,be made of the
           specific implications of the various aspects of federal energy facility siting
           policy for each of the eight Great Lakes states.

              10.    STATE AND FEDERAL POLICIES

                   Policy research is necessary in  state and federal policies affecting
           energy use. Suggestions should be made   for the establishment of coherent frame-
           work within which the present energy use  policies can be viewed and future
<pb n="475" />

                                                     456

              policies developed. Furthermorej the interaction among policy development,
              technology, and resource requirements needs considerable attention.

                      At the state level, the.effect of electric and fuel rates on the need
              for energy,facilities should be investigated. At the federal level, a comp
              hensive fuels use-environmental policy would provide guidance,to.the energy
              industry.

                 11. SHORELINE USE

                      A detailed study of shoreline land use should be undertaken on a state-
              by-state as well as regional basis. Energy facilities.compete with other uses
              of the shoreline. A better understanding of these uses and their relationship
              and dependence on shoreline locations co ld greatly assist coastal zone manage-
              ment planning.

                 12. ENVIRONMENTAL AND ECONOMIC EFFECTS

                      Load centers for electricity and facilities to provide this power are

              clustered near the coastline of the Great Lakes.. The environmental and economic

              effects of these facilities on the Great Lakes  coastal zone in the context of

              resource and impact management should be investigated.

                 13. LOCAL PLANNING AND DECISION MAKING

                      Planning and decisions made at the  local (municipal, county, multi-coun-
              ty) level can have a significant impact on  the,availability and use of resources.
             .Planning for energy facilities is a case in point. Further research.should be
              directed-toward how local planning and decision-making affect resource manage-
              ment and what are the types of policies, institutions, and processes involved in
              this planning and@',decision-making.

                 14. THE-GREAT LAKES BASIN AS A FUTURE EXPORTER OF ELECTRICITY

                      The Great Lakes provide a water resource for cooling and process water
              in the energy industry as well as for other industries. The potential exists
              for this use of Great Lakes water to expand in the future. Energy facilities do

              not need to locate on the shoreline to use this resource, but can be located
              inland and still draw on it. If large energy facilities or clusters of facil-
              it.ies localte in or near the coastal zone of the Great Lakes and export energy

              from this area while utilizing its water resources, the social, economic,
<pb n="476" />

                                                457

           political, and environmental implications of this circumstance should be examined

           in detail.

              15. INTERNATIONAL IMPLICATIONS

                   Great Lakes ports engage in international shipment of fuels for energy
           production. In addition, electricity is transmitted back and forth (primarily
           on a seasonal basis in the Great Lakes Region) across the international boundary.
           Further study should be undertaken by the United States and Canada to determine
           the implications of this for plant requirements and the associated resource
           demands and impacts.
<pb n="477" />

                                                  459

                                             Appendix A

                     STANDING COMMITTEE ON GREAT LAKES COASTAL ZONE MANAG EME NT

         MICHIGAN                                      MINNESOTA

           Mr. Merle Raber, Acting Chief                 Mr. Gene Hollenstein
           Shorelands Management &amp; Water Resources       Chief Hydrologist
            Planning Sec.,-Div. of Land Use              Division of Water', Soils &amp; Minerals
           Michigan Dept. of Natural Resources           Minnesotabept. of Natural Resources
           Stevens T. Mason Building                     345 Centennial Building
           Lansing, Michigan 48926                       St. Paul Minnesota 55155
          ILILINOIS                                      Mr. Roger Williams
                                                         Minnesota State,Planning Agency
           Mr. Peter L. Wise (Committee   Chairman)      100 Capitol Square Building
           Coordinator-for Coastal Zone   Management     St. Paul, Minnesota 55101
           Marina City Office Building                   M.r. Archie Chelseth
           300 North State St., Room 1010                Assistant Commissioner
           Chicago, Illinois 60610                       Minnesota Dept. of Natural Resources
           Mr. Chris A. Shafer                           300 Centennial Office Building
           Assistant Director for.CZM                    St. Paul, Minnesota 55155
           Department of Transportation
           Marina City Office Building                 NEW.YORK
           300 North State St., Room 1010                Mr. Henry Williams
           Chicago, IlIlinois 60610                      Director of State Planning
         INDIANA                                         Department of State
                                                         162-Washington Avenue
           Mr. William J. Andrews, Deputy   Director     Albany, New York 12231
            for Water &amp; Mineral Resources                Mr. Frederick W. Howell
           Indiana Dept. of Natural Resources            New York State Department of
           608 State Office Building                      Environmental Conservation
           Indianapolis, Indiana 46204                   50 Wolf Road
           Mr. Theodore Pantazis                         Albany, New York '@12233
           State Planning Services Agency
           143 West Market Street                      OHIO
           Harrison Building                             Mr. Bruce-E. McPherson
           Indianapolis, Indiana 46204
                                                         Shoreland Management, Div. of Water
                                                         Ohio Dept. of Natural Resources
                                                         Building E., Fountain Square
                                                         Columbus, Ohio 43224
<pb n="478" />

                                                      460

            PENNSYLVANIA                                     DEPT. OF INTERIOR
              Mr. Georj@e E. Fogg, Coordinator                  Ms. Madonna F. McGrath,.Acting
                       9
              Coastal Zone Management Program                    Special Assistant to the Secretary
              Dept. of Environmental Resources                  North Central Region
              Bureau of Resources Programming                   U.S. Dept. of Interior
              Third &amp; Reily Streets                             230 S. Dearborn Street
              Harrisburg, Pennsylvania      17120               Chicago, Illinois 60604

            WISCONSIN                                        DEPT. OF ARMY
              Mr. Theodore F. Lauf                              Mr* Louis D'Alba
              Coordinator-Special Projects                      Planning Branch
              Office of Planning &amp; Analysis                     North Central Division
              Wisconsin Dept. of Natural Resources              U.S. Army Corps of Engineers
              Box 7921                                          536 South Clark Street
              Madison, Wisconsin 53707                          Chicago, Illinois 60605

              Mr. Allen Miller
             .Land Use Coordinator                           ENVIRONMENTAL PROTECTION   -AGENCY
              Dept. of Administration                           Mr. Ralph Nordstrom, CZM Coordinator
              State Planning Office                             Planning Branch
              1 West Wilson Street                              Airand  'Water Programs Division
              Madison, Wisconsin 53702                          Environmental Protection Agency
                                                                230 South Dearborn Street
            DEPT. OF TRANSPORTATION                             Chicago, Illinois 60604
              Mr. David C. Robb, Director
                                                             DEPT. OF HOUSING 6, U"AN DEVELOPMENT
              Office of Comprehensive Planning
              St. Lawrence Seaway Development Corp.             Mr. Harry P. Blus
              800 Independence Avenue, S.W.                     Environmental Standards Officer
              Washington, D.C. 20591                            Community Planning and Management
              Cmdr. Charles R. Corbett                          U.S. Dept. of HUD
              Chief of Environmental Affairs                    Region V
             'Nin'th Coast uard District                        300 South Wacker Drive
              1240 East 9th Street                              Chicago, Illinois 60606
              Cleveland, Ohio 44199                          SECRETARIATS

            DEPT. OF COMMERCE                                   Mr. Leonard T. Crook
              Dr. Arthur P. Pinsak                              Executive Director
              Great Lakes Environmental Research Lab            Great Lakes Basin Commission
              Dept. of Commerce, NOAA                           3475 Plymouth Road
              2300 Washtenaw Avenue                             P. 0. Box 999
                                                                Ann Arbor, Michigan 48106
              Ann Arbor, Michigan 48104
                                                                Mr. Gerald F. Kotas
              Ms. Eileen Mulaney                                Water Resources Planner
              Office of Coastal Zone Management                 Great Lakes Basin Commission
              Dept. of Commerce, NOAA'                          3475 Plymouth Road
              3MO Whitehaven Street                             P. 0. Box 999
              @Page Building No. 1                              Ann Arbor, Michigan 48106
              Washington, D.C. 20235
<pb n="479" />

                                                   461

                                               Appendix B

                                 CZM ENERGY PROJECT STEERING COMMITTEE

          Mr. John Armstrong                              Mr. David C. N.  Robb, Director
          State Planning Office                           Office of Comprehensive Planning
         ,l West Wilson Street                            St. Lawrence Seaway Corporation
          Madison, Wisconsin 53702                        800 Inddpendence Avenue, S.W.
                                                          Washington, D.C. 20591
          Dr. William Mattox
          Ohio Dept. of Natural Resources                 Mr. Warren Hofstra
          .Building D, Fountain Square                    North Central-Region
          Columbus, Ohio 43224                            U.S. Dept. ofthe Interior
                                                          230 S. Dearborn Street, 32nd Floor.
          Mr. Delbert Johnson                             Chicago, Illinois 60604
          Water Resource Planner
          Bureau of Water Management                      Mr. James H. Phillips
          Michigan Dept. of Natural Resources             EniE@rgy-Coordinator, Region.V
          Stevens T. Mason Building                       U.S. Environmental Protection Agency
          Lansing, Michigan 48926                         230 South Dearborn Street

          Mr, Thomas Fiddler                              Mr. John Paul Tolson
          Ddpt.:of Environmental Resources                Office of Coastal Zone Management
          P. 0. Box 14.67                                 NOAA, Dept. of Commerce
          Harrisburg, Pennsylvania 17120                  3300 Whitehaven.Street
                                                          Page Building #1
          Mr. Dmitri Aperjis                              Washington, D.C. 20235
          Office of Coastal Zone Management
          NOAA, Dept. of Commerce.
          3300 Whitehaven Street,
          Page Building #1
          Washington, D.C.   20235
<pb n="480" />

                                                      462

                                                Appendix C

                                   CZM ENERGY PROJECT TECHNICAL ADVISORS

               Mr. Fred Abel                                Mr. Forrest G. Hiple
               U.S. Energy Research                         Vice-President
                and Development Administration              Electric Operations &amp; Construction
               Fossil Energy                                Northern Ind. Public Service Company
               20 Massachusetts Ave., N.W.,                 5265 Hohman Avenue
               Washington, D.C. 20545                       Hammond, Indiana 46320

               Professor Richard Bishop                     Mr. John Hoover
               Dept. of Agricultural Economics              Argonne National Laboratory
               340 Agricultural Hall                        9700 S. Cass Avenue
               1450 Linden Drive                            Argonne, Illinois 60439
               Madison, Wisconsin 53706
                                                            Mr. Herb Jacobs
               Mr. Karl Bremer                              Governor's Energy Council
               Lake Studies PCB                             905 Payne-Shoemak6r Building
               Technical Support Branch                     -Harrisburg, Pennsylvania 17120
               U.S. Environmental Protection  Agency
               230 S. Dearborn                              Mr. Owen A. Lentz, Exec. Manager
               Chicago, Illinois 60604                      East Central Area Reliability
                                                             Coordination Agreement
               Mr. Walker Cisler                            P.O. Box 102
               1071 Devonshire                              Canton, Ohio 44701
               Grosse Point, Michigan   48236
                                                            Dr. James L. Liverman
               Mr. Andrew (Pete) D'Zmura                    U.S. Energy Research and Development
               19155 Roman Way                                Administration
               Gaithersburg, Maryland 20760                 Mail Station.E-201
                                                            Washington, D.C. 20545
               Mr. Hugh Gardner
               Federal Energy Administration                Mr. Peter Meier
               175 W. Jackson                               Associated University, Inc.
               Chicago, Illinois 60604                      Brookhaven National Laboratory
                                                            Upton, New York 11973
               Mr. Tom Hemminger
               Commonwealth Edison                          Mr. Walter J. Matthews
               Div. of Environmental Affairs                555 Wayside Drive ,
               Box 767                                      Indianapolis, Indiana 46260
               Chicago, Illinois 60690
<pb n="481" />

                                                463

         Mr. E.L..Michelson                           Mr. Richard Williamson
         Administrative Manager, MAIN                 Systems Analysis
         .1 N. 301 Swift Road                         U.S. Energy Research and
         P.O. Box 278                                  Development Administration
         Lombard, Illinois 60148                      20 Mass Ave., N.W.
                                                      7th Floor, APAE
         Mr. William McGorum, Acting Secretary        Washington, D.C. 20545
         Ohio Power Siting Commission
         Seneca Tower                                 Mr. Alec Wisch
             E. Broad Street                          Governor's Energy Council
         Columbus, Ohio 43215                         905 Payne-Shoemaker Building
                                                      Harrisburg, Pennsylvania 17;20
         Mr. Charles Hill
         Federal Power Commission                     Mr. Howard Zar., Oceanography
         Federal Building, Room 3130                  Permits Branch
         230 S. Dearborn Street                       U.S. Environmental Protection Agency
         Chicago, Illinois 60604                      230 S. Dearborn
                                                      Chicago, Illinois 60604
         Mr. Robert S. Ryan, Director
         Ohio Energy Research and                     Mr. Ellison Burton
           Development-Agency                         U.S. Energy Research and
         25th Floor, State Office  Tower               Development Administration
         30 E. Broad Street,                          APAE - 7th Floor
         Columbus, Ohio 43215                         Washington, D.C. 20545

         Mr. Al Grandys                               Mr. Robert H. Sims, Chairman
         Division of Energy                           Mid-Atlantic Area Coordination Group
         Illinois Dept. of Bus.                       co/GPU Service Corp.
          and Economic Dev.                           260 Cherry Hill Road
         222 S. College Street                        Parsippany, New Jersey 07504
         Springfield, Illinois 62706
                                                      Mr. Julius Bleiweis
         Dr. Miller Spangler                          Executive Director
         U.S. Nuclear Regulatory Comm.                Northeast Power Coordinating Council
         Washington, D.C. 20555                       1250 Broadway
                                                      New York, New York 10001
         Mr. Richard L. Wawrzyniak
         Assistant Chief,                             Mr. Thomas Jackson
         Division of*Water                            Michigan Energy Administration
         Room 605, State Office Bldg.                 Dept. of Commerce.
         Indianapolis, Indiana 46204                  Law Building
                                                      Lansing, Michigan 48913
         Mr. Robert F. Welford, Reg. Coordinator
         U.S. Fish &amp; Wildlife Service                 Mr. Jick Hyers
         Federal Bldg., Ft. Snelling                  Office of Planning, Analysis, &amp;
         Twin Cities, Minnesota 55111                  Evaluation
                                                      U.S. Energy Research and
         Mr. Jerry.Williams, Engineer                  Development Administration
         Environmental Impact Statement               Washington, D.C. 20545
         EIS Review Section
         U.-S. Environmental Protection Agency
         26th Floor, S&amp;A Division
         230 S. Dearborn
         Chicago,-Illinois 60604
<pb n="482" />

                                                      464

               Professor John Steinhart                    Mr. John Foltz
               Associate Director, Marine Studies Center   Ashland Oil Co., Inc.
               University of Wisconsin--Madison            ATTN:. Communications Department
               1225 West Dayton Street                     P.O. Box 391
               Madison, Wisconsin 53715                    Ashland, Kentucky 41101

               Mr. Frank Davenport                         Dr. John Armstrong
               U.S. Water Resources Council                Coastal Zone Laboratory
               Suite 800, Gelman Building                  University of Michigan
               2120 "L" Street                             Ann Arbor, Michigan 48109
               Washington, D.C. 20037,
                                                           Mr. Jim Beatty
               Mr. Derek M. Foulds                         Sault St. Marie Power and Light
               Director, Ontario Region                    Sault St. Marie, Michigan
               Inland Waters Directorate
               135 St.,Clair Ave., West                    Mr. Rob Callen, Director
               2nd Floor                                   Research Division
               Toronto., Ontario M4V 1P5                   Public Service Commission
                                                           7545 Mercantile Way
               Mr. Richard C. Clancy                       Lansing, Michigan
               Vice President
               Ni'gara Mohawk Power  Corporation
                 a                                         Mr. Joseph Cook, Manager
               300 Erie Boulevard West                     Port Development Section
               Syracuse, New York 13202                    Bureau of,Transportation   &amp; Planning
                                                           Michigan Dept. of State Highways &amp;
               Mr. George L. Houston                        Transportation
               Assistant Vice President                    Highways Building
               New York State Electric &amp; Gas               Lansing, Michigan
               .Corporation
               4500 Vestal Parkway East                    Dr. William Cooper
               Binghamton, New York. 13902                 Department of Zoology
                                                           Michigan State University
               Mr. Gerald I. Stillman                      East Lansing, Michigan
               Acting Prin'cipal Environmental Engineer
               Power Authority of the State of New York    Mr. John Duane, Staff Engineer
               10 Columbus Circle                          Gas Energy Planning Dept.
               New York, New York    10019                 Consumers Power Company
                                                           212 W. Michigan Avenue
               Mr. Roger W. Kober                          Jackson, Michigan 49201
               Acting Assistant
               Manager of Environmental Engineering        Professor Marc Enns
               Rochester Gas and Electric Corporation      East Engineering Building
               89 East Avenue                              University of Michigan
               Rochester, New York 14649                   Ann Arbor, Michigan 48109

               Mr. Earl G. Ellerbrake                      Mr. Thomas Cotton
               Office of Oil and Gas                       Office of Technology Assessment
               Federal Energy Administration               U.S. Congress
               Room 3442, Federal Building                 Washington, D.C.
               12th and Pennsylvania Ave., N.W.
               Washington, D.C. 20461                      Dr. Fred Jones
                                                           American Natural Gas Company
                                                           .1 Woodward Avenue
                                                           Detroit, Michigan
<pb n="483" />

                                               465

          Dr. Elizabeth Peel
          Social Impact Assessment
          Oakridge National Laboratory
          P.O. Box X
          Oakridge, Tennessee 37830

          Mr. Car 1 Rapport
          Federal Energy Administration
          Washington, D.C.

          Mr. Burkhard H. Schneider
          Detroit Edison Company
          2000 Second Avenue
          Detroit,.Michigan 48823

          Mr. Richard T. Huber
          Fish and Wildlife Service
          U.S. Dept. of the Interior
          Federal Building, Fort Snelling
          Twin Cities, Minnesota 55111

                    While a broad group of technical advisors from both the public and
           private sectors participated in the study by reviewing and commenting on
           preliminary material and the draft report, this should not be taken as their
           endorsement of this final report. They served only as advisors, reactors,
           and providers of information.
<pb n="484" />

                                                    466

                                                Appendix D

                                   CZM ENERGY PROJECT CITIZEN ADVISORS

                                      Mr. David Comey
                                      Executive Director
                                      Citizens for a Better Environment
                                      Suite 2610, 59 E. Van Buren
                                      Chicago, Illinois 60605

                                      Dr. John Neess
                                      Department of Zoology
                                      Birge Hall
                                      University of Wisconsin
                                      Madison, Wisconsin 53706

                                      Mr. Myron Cherry
                                      One IBM Plaza, Suite 4501
                                      Chicago, Illinois 60611

                                      Mrs. Betty MacDonald
                                      Regional Resources Chairperson
                                      League of Women Voters
                                      1155 Edgewood Avenue
                                      Madison, Wisconsin 53711

                                      Dr. Paul Friesma
                                      Public Lands Project
                                      Northwestern University
                                      Evanston, Illinois 63301

                                      Ms. Louise Young
                                      755 Sheridan
                                      Winnetka, Illinois 60093
<pb n="485" />

                                               467

                                           Appendix E

                                    CZM ENERGY PROJECT STAFF

         PROJECT MANAGEMENT

           Leonard Crook, Executive Director--Supervisor
           Charles Job--Project Manager
           Gerald Kotas--Coastal Zone Management Coordinator

         POLICY UNIT

           Thomas Gross--Policy Analyst
          'John Hall--Resources Planner and Policy Analyst

         COASTAL DEPENDENCE UNIT

           Robert Clemens--Geologist

           John Johansen--Economist

           William Skimin--Resources Planner and Policy Analyst

         PROJECTIONS AND TRENDS UNIT

           Reed Bohne--Resources Planner

           David Staples--Resources Planner and Policy Analyst

         SECRETARY AND OFFICE MANAGEMENT

           Terri Ogle--Secretary and Office Manager
           Marie Murrell--Typist

         TECHNICAL ADVISORS

           Jonathan Mayer--Transportation Research Analyst
           Timothy Monteith--Civil Engineer
<pb n="486" />

                                                       468

                                                   Appendix F

                        SUMMARY OF AIR QUALITY EFFECTS OF S023, PARTICULATES, AND N02

               Effects of Sulfur Dioxide

               1. Effects on Humans
                                    3
                       0   1500 pg/m  (0.52 ppm) of sulfur dioxide (24-hour average), and
                           suspended particulate matter measured as   'a soiling index of 6 cohs or
                           greater:  increased mortality may occur (American data).
                                   .3
                       0   715 pg/m  (0.25 ppm)  of sulfur dioxide and higher (24-hour mean),
                           accompanied by smoke  at a concentration of 750 pg/m3: increased daily
                           death rate may occur  (British data).
                       e   500 pg/m3_(O.lgl ppm) of sulfur dioxide (24-hour mean), with -low
                           particulate levels:   increased mortality rates.may occur (Dutch data).
                       0   300 pg/m3 to 500 pg/m 3 (0.11 ppm to 0.19 ppm) of sulfur dioxide
                           (24-hour mean), with low particulate levels: increased hospital admis-
                           sions of older persons for respiratory diseas  'e may occur; absenteeism
                           from work, particularly with older persons, may also occur (Dutch
                           data).
                       0             (0.25 ppm) of sulfur dioxide (24-hour mean), accompanied by
                           particulate matter: a sharp rise in illness rates for patients over
                           age 54 with severe bronchitis may occur (American data).
                       0             (about 0.21 ppm) of sulfur dioxide (24-hour mean), with smoke
                           concentrations of about 300 pg/m3: patients with chronic lung disease
                           may experience accentuation of symptoms (British data).
                       0   105 Pg/m3 to 265 pg/m3 (0.037 ppm to 0.092 ppm) of sulfur dioxide        3:
                           (annual mean), accompanied by smoke concentrations of about 185 P-g/m
                           increased frequency of respiratory symptoms.and.lung disease may occur
                           (Italian data).
                       0             (0.046 ppm) of sulfur dioxide (annual mean), accompanied by
                           smoke concentrations of about 100 pg/m3: increased frequency and .
                           severity of respiratory diseases in school children may occur (British
                           data).

               Material in this appendix is adapted from Environmental Protection Study,
               prepared by ICF, Incorporated, for the Michigan Public Service Commission.
               May, 1975.
<pb n="487" />

                                               469

                0 115 Ug/m  3 (0.040 ppm) of sulfur dioxide (annual mean), accompanied
                    by smoke concentrations of about 160 pg/m3: increase in mortality from
                    bronchitis and from lung cancer may occur (British data).

        2. Effects on Visibility
                            3
                    285 pg/m (0.10 ppm) of sulfur dioxide, with comparable concentration
                    of particulate matter and relative humidity of 50 percent: visibility
                    may be reduced to about five miles (American data).

        3. Effects on Materials
                0 345 pg/m  3 (0.12 ppm), accompanied by high particulate levels: the
                    corrosion rate for steel panels may be increased by 50 percent
                    (American data).

        4. Effects on Vegetation
                0   85 pg/m 3(0.03 ppm) of sulfur dioxide (annual mean): chronic plant
                    injury and excessive leaf drop may occur (Canadian data).
                0   860 pg/m3 (0.3 ppm) of sulfur dioxide for 8 hours: some species of
                    trees and.,shrubs show injury (American data).
                0   145 Ug/m3 to 715 pg/m3 (0.05 ppm to 0.25 ppm):- sulfur dioxide may
                    react synergistically with either ozone or nitrogen dioxide in short-
                    term exposures (e.g., 4 hours) to produce moderate to severe injury
                    to sensitive plants (American data).

        Effects of Particulates

        1. Effects on Humans
                *   750 Mg/m3 and high er for particulates on a 24-hour averagp, accompanied
                    by sulfur dioxide concentrations of 715 pg/m3 and higher: excess
                    deaths and a considerable increase in illness may occur (British data).
                e   A decrease from 140 p /m3 to 60 yg/m3 (annual mean) in particulate
                    concentrations may be accompanied by a decrease in mean sputum volume
                    in industrial workers (British data).
                                                    3
                9   If concentrations above 300--Pg/m for particulates persist on a 24-hour
                    average nd are accompanied by sulfur dioxide concentrations exceeding
                    630 pg/ml over the same average period, chronic.bronchitis patients
                    will likely suffer acute worsening of symptoms (British data).
                                 3
                0   Over 200 pg m for particulates on a 24-hour average, accompanied by
                    concentrations of sulfur dioxide exceeding 250 Pg/m3 over the same
                    average period: increased absence of industrial workers due to illness
                    may occur (British data).
                0   100 Pg/m3 to 130 pg/m3 and above for particulates (annual mean) with
                    sulfur dioxide concentrations (annual mean) greater than 120 Pg/m3:
                    children residing in such areas are likely to experience increased
                    incidence of certain respiratory diseases.
<pb n="488" />

                                                      470

                                          3
                      *   Above 100 Pg/m for p2rticulates (annual geometric mean) with sulfation.
                          levels above 30 mg/cm -Mo.: increased death rates for persons over 50
                          years of age are likely (American data).
                      *   80 pg/m3 to loopg/M 3 for particula5es (annual geometric mean) with
                          sulfation levels of about 30 mg/cm -mo.: increased death rates for
                          persons over 50 years of age may occur (American data).

              2.  Effects on Direct Sunlight
                                  3             3
                      0 100 Pg/m. to 150 pg/m for particulates, where large smoke turbidity
                          factors persist: in middle and high latitudes direct sunlight is
                          reduced up to one-third in summer and two-thirds in winter (American
                          data).

              3. Effects on Visibility
                      0   150 pg/m3 for particulates, where the predominant particle size ranges
                          from 0.2 to 1.0 and relative humidity is less than 70 percent:
                          visibility is reduced to as low -as 5 miles (American data).

              4. Effects on Materials
                      0 60 pg/m  3 ( annual geometric mean), to 180 pg/m   3 for particulates
                          (annual geometric mean), in the presence of sulfur dioxide and moisture:
                          corrosion of steel and zinc panels occurs at an accelerated rate
                          (American data).

              5. Effects on Public Concern
                      0 70 pg/m  3 for particulates (annual geometric mean), in the presence of
                          other pollutants: public awareness and/or concern for air pol      lution
                          may become evident and increase proportionately up to and above con-
                          centrations of 200 pg/m3 for particulates (American data).

              Effects of Nitrous Oxide

              1. Effects on Humans
                                  3
                      0   225 pg/m@ (0.12 ppm) for nitrogen dioxide: an odor becomes detectable.
                      *   9,400 pg/m3 ( 5 ppm) for nitrogen dioxide for 10 minutes: has produced
                          transient increase in-airway resistance.
                      9   162,200 Vg/M3 (90 ppm) for nitrogen dioxide-for 30    minutes: has pro-
                          duced pulmonary edema 18 hours later.
                      0   118 to 156 jig/m3 (0.063 to 0.083 ppm) for nitrogen dioxid  S  (24-hour
                          standard) with a mean suspended nitrate level of 2.6 Pg/m orgreater:
                          increased acute bronchitis among infants and school children.
                      a   117 to 205 pg/m3  (0.062 to 0.109 ppm) for nitrogen dioxide (24-hour
                          mean) with a mean suspended nitrate level of 3.8 pg/m3 or greater:
                          increased acute respiratory disease.in family group.
<pb n="489" />

                                                471

         2. Effects on Materials
                 a           .(0.25 ppm) for nitrogen dioxide for 8 months caused leaf
                    abscission and decreased yield among navel oranges.
                 0, 940 pg/m3  (0.5 ppm) for nitrogen dioxide for 35 days resulted in leaf
                    abscission and chlorosis on citrus fruit trees.
                 0  1,900 Pg/m3  (1 ppm) for nitrogen dioxide for one day can cause overt
                    leaf injury to sensitive plants.
<pb n="490" />

                                                                                        472
                                                                                   Appendix G

                                                                  ELECTRIC        GENERATING FACILITIES

                                                                                                    WATER              AVG CPS          PLANT            OF
                  COUNTY LOCATION          COMPANY      PLANT WAKE       MWe       FUEL,            SOURCE             INTAKE       HEAT RATE        UNITS     STATE

                                      CLev. Elect.                                                                                      BTU/KWH
                  Ashtabula           Ilium. Co.        Ashtabula           640 coal/Oil      Lake  Erie                  658           11,428           9    10hio
                                      Clev. Elect.
                  Lorain              11.1um. Co        Avon Lake        1,275    Coal/Oil    Lake  Erie                  947           10,338           9    Ohio

                                      Clev. Elect.
                  Lake                Ilium. Co.        East Lake        1,275    Coal/Oil    Lake  Erie               1,270            9,512            5    Ohio

                                      Clev. Elect..
                  Cuyahoga            Illum. Co.        Lake Shore          514   Coal/Oil    Lake  Erie                  4.56          11,552           5    Ohio

                                      Commonwealth
                  Lake                Edison Co.        State Line          972   Coal/Gas    Lake  Michigan           1,259            10,573           4    Indiana

                                      Commonwealth
                  Cook                Edison Co.        Fisk                547,  Coal/Cas    Chicago Canal               401           11,302           3    1111inois
                                      Commonwealth
                  Cook                Edison Co.        Calumet             107   Gas         Calumet River               67            13,224           1    Illinois

                                      Conwionwealth
                  Cook                K,116on Co.       Crawford            702   Coal/Gas    Chicago Canal               593           10,292           3    Illinois

                                      Commonwealth
                  Cook                Edison Co.        Ridgeland           6901  oil/Gas     Chicago Canal               742           11,177           4    Illinois

                                      Commonwealth
                  Lake                Edison Co.        Waukegan            933   Coal/Oil    Lake Michigan               962           10,195           7

                                      Commonwealth
                  Lake                Edison Co.        Zion             1,098    Nuclear     Lake Michigan            1,618            13,269           1    Illinois

                                      Copsumers
                  Muskegon            Power Co.         Cobb                510   Coal/Oil    Lake Muskegon               619           10,590           5    Michigan

                                      COLIsumers        Big Rock
                  Charlevoil          Power Co.         Point                75   Nuclear     Lake Michigan               114           11,421           1    Michigan

                                      Consumere
                  Bay                 Power Co.         Karn                550   Coal/Oil    Saginaw River               454           9,136            2    IMichigan
                                      Cunsufflers
                  Ottawa              Vuwer Co.         Campbell            650   C*6al/Oil   Pigeon Lake                 504           9,097            2    Michigan

                                      Coa8umers
                  Van Buren           Power Co.         Palisades           720   Nuclear     Lake Michigan               900           10.981           1    Michigan
                                      Detroit Pub.                                                                                      B711-J FKWI -I
                  Wayne               Lightng.Comm      Misteroky           174   Coal        Detroit River               243           10,9  09         6    Michigan
                                      Lk..Superior                                coal/
                  Ashland             Dist.Pwr.Co.      Bay Front            82   Oil/Gas     Lake Superior               46            13,213           6    Wisconsin

                                      Manitowoc
                  Manitowoc           Public Util.      Manitowoc            69   Coal        Lake Michigan               51            14,999           5    Wisconsin
                                      Marquette Brd.
                  Marquette           of Lt &amp; Powei     Sheras               37   Coal/Gas    Lake Superior               30            14,243           2    Michigan

                                      Minn. Power
                  St. Louis           &amp; Light.          Aurora              110   Coal/Oil    Lake Colby                  210           13,030           2    Minnesota
                                      Minn. Power                                 Coal/
                  St. Louis           &amp; Light.          Hibbard             124   oil/Gas     St.Louis River              364           14,576           4    Minnesota,
                                      Niagara-Mo-
                  Oswego              hawk Pwr.Co.      Oswego              376   Oil         Lake Ontario                500           11,51-5          4    New York

                                      Niag.-Mohawk
                  Erie                Power Co.         Huntley             828   Coal        Niagara River            1,160            10,380           6    New York

                                      Niag.-Mohawk
                  Chautauqua          Power Co.         Dunkirk             628,  Coal/Oil    Lake Erie                   890           109059           4    New York

                                      Niag.-Hohawk      9 Mile
                  Oswego              Power Co.         Point Nuc           500   Nuclear     Lake Ontario                518           10,7()9          1    New York

                                      No.Ind.Publii
                  Porter              Serv. Co.         Bailly              615   Coal/Gas    Lake Michigan               470           10,008           2    Indiana
                                      Consumers                                   Coal/Casl
                  Bay                 Power Co.         Weadock             614   oil         Saginaw River               545           10,61A           8    Michigan

                                      Consumers
                  Monroe              Power Co.         Whiting             325   Coal/oil    Lake Erie                   362           9,913            3    Michigan
                                                                                  Coal/
                  Wayne               Detroit Edis      Conners   Creei     510   Oil/Gas     Detroit River      1        796           13,050           a    Michigan
<pb n="491" />

                                                                                      473

                                                                                                   WATER                    AVG CFS    PLANT             OF
                 COUNTY LOCATION          COMPANY      PLANT NAME         MWe       FUEL            SOURCE                  INTAKE     HEAT RATE     UNITS     STATE

                 Wayne               D.truit Edis      Delray                    375 Oil/Gas  Detroit    River              375-       14,440            6    Michigan

                 Monroe              0-.Lrolt Edis     Fermi                     1581 Oil  _  Lake Erie                     82         14,626            1    Michigan
                                                                                                                            -          BTU/KWH
                 Huron               Detroit Edisi     Harbor beach              121 Coal/Oil Lake Huron                    154        10,600            1    Michigan

                 St. Clair           betroit Edis      Marysville                200 Coal/Cas St.Clair River                461        12,300            7    Michigan

                 Wayne               Detroit Edis      Pennsalt                  37 Coal/Oil  Detroit River                 18         54,657            7    Michigan
                                                                                 Coal/
                 Wayne               Detroit Edis      River Rouge               933 Oil/Gas  Detroit River                 1,041      9,450             3    [Michigan
                                                                                 Coal/
              .St. Clair             Detroit Edis      St.. Clair        1,905   Oil/Gas      St.Clair River                2,290      9,220             7    Michigan
                                                       Trenton                   Coal/
                 Wayne               Detroit Edis      Channel                   876 Oil/Gas  Detroit River                 1,400      10,450            5    Michigan

                                                                                 Coal/                                      -
                 Wayne               Detroit Edis      Wyandotte                 541 Oil/Gas  Detroit    River              152        11,800            8    Michigan

                 Monroe              DeLruit Edis      Monroe            2,462   Coal/Oil     Raisin River.                 1,796      9,600             3    Michigan
                                     No.Indiana
                 Lake                Public Serv.      Mitchell                  529' Coal/Gas Lake Michigan                690        10,124            4    Indiana

                                     No. Indiana
                 Lap2jtei            Public Serv.      Michigan    Cit3          215 Coal/Gas Lake Michigan                 223        12,349            3    Indiana
                  p"r :

                                     No Mich
                 C
                 C     v
                 har@l.voix          Ll-*@c.C-.P'.In4. Advance.                  37 Coal      f Lake Charlevoix             856        12,636            3    Michigan
                                     Ohio
                 Lorain              Edison Co.        Edgewater                 193 Coal     Lake Erie                     181        11,747            3    Ohio
                                     Pennsylvania
                 Erie                Elec. Co.         Front Street              119 Coal     Lake Erie                     220        14,295            5    Patin .

                                     Rochester Ga!                               Coal/
                 Monroe              &amp; Etec. Corp      Rochester #3              196 Oil/Gas  Genessee River                147        18,849     1      9    New York
                                     Rochester Ga!
                 Monroe              &amp; Elf-c.Corp.     Rochester #7              253 Coal/Oil Lake Ontario                  231        10,534            4    New York

                                     Rochester Gat
                 Wayne               &amp; Elec.Corp.      Rochester#13              490 Nuclear  Lake Ontario      1           842        10,803            1    New York
                                     Toledo Edisoi                               ICoal/                                                BTU/KWH i
                 Lucas               Co.               Acme                      321 Oil/Gas  Maumee River                  309        12,994     1      5    Ohio

                                     Toledo
                 Lucas               Ecison Co.        Bay Shore                 638 Coal/Oil Maumee River                  1,100      9,238             4    Ohio

                                     Upper Penin.      Presque
                 Marquette           Gen. Go.       -  isle                      175 Coal/Oil Lake Superior                 1814       11,283            4    Michigan
                                     Wisconsin
                 Milwaukee           Elec.fi Pwr 0     Commerce                  35 Oii/Gas   Milwaukee River               72         16,021            1    lWisconsin
                                     Wis. Elect.
                 Milwaukee           &amp; Power Co.       Lakeside                  310 Oil/Gas  Lake Michigan                 41         172159            8    Wisconsin

                                     Wis *  Elect.     North
                 Milwaukee           &amp; Power Co.       Oak Creek                 500 Coal/Oil Lake Michigan                 686        10,301            4    Wisconsin,
                                     Wis. Elect.       Port
                 Ozaukee             &amp; Power Co.-      Washington                400 Coal     Lake Michigan                 623        11,585            5    Wisconsin

                                     Wis. Elect.       South
                 Milwaukee           &amp; Power Co.       Oak Creek         1,192   Coal/Oil     Lake Michigan                 1,457      9,685             4    Wisconsin

                                     Wis. Elect.                                              N. Menominee
                 Milwaukee           &amp; Power Co.       VAIley                    272@ Coal/Gas Canal                        182        14,145            2    Wisconsin

                                     Wis. Elect.
                 Manitowoc           &amp; Power Co.       Point Beach       1,047   Nuclear      Lake Michigan                 1,287      10,934            2    Wisconsin

                                     Wis. Elect.
                 Sheboygan           &amp; Power Co.       Edgewater                 437 Coal/Oil Lake Michigan                 295        10,085            4    Wisconsin
                                     Wis. Elect.                                 Coal/Oili
                 Brown               &amp; Power Co.       Pulliam                   393 Gas      Fox River                     500        11,351            8    Wisconsin

                                     Ind. &amp; Mich.
                 Berrien           jElectric Co.       Cook, D.C.       1,089    Nuclear      Lake Michigan                 1.537      10,771            1    Michigan
<pb n="492" />

                                                475

                                            ACRONYMS

          AQCR - air quality control region
          ACRS - Advisory Committee on Reactor Safety
          ASLB - Atomic Safety and Licensing Board
          BWR - boiling water reactor
          cfs - cubic feet per second

          DER - Department of Environmental Resources

          DES - Draft Environmental Statement

          DNR - Department of Natural Resources
          EHV - extra high voltage
          EPA - Environmental Protection Agency
          EQC - Environmental Quality Council
          ESECA   Energy Supply and Environmental Coordination Act
          ERDA   Energy Research and Development Administration
          FEA - Federal Energy Administration

          FES - final environmental statement

          FPC - Federal Power Commission

          gpd - gallons per day
          gpm - gallons per minute
          kWh - kilowatt (1,000 watts) hour

          LMFBR   liquid metal fast breeder reactor
          LNG - liquefied natural gas
          MW = megawatt (1,000,000 watts)

          NO  - nitrous oxides

          NPDES - National Pollutant Discharge Elimination System
          NRC - Nuclear Regulatory Commission
          PCRV - prestressed concrete reactor vessel

          PSC - Public Service Commission or Power Siting Commission
          PUC - Public Utility Commission
          SIP - state implementation plan
          SNG - synthetic natural gas
          SO x- sulphur oxides
<pb n="493" />

                                                   477

                                               GLOSSARY

          Base load unit      an electric generating facility which is normally operated to
               carry base load and which, consequently, operates essentially at a constant
               load.

          Base loading    the operation of a unit at or near its rated output to supply the
               base load  of a system.

          Benthic organisms - organisms attached, resting, or living on or in the bottom
               sediments.

          Blowdown - release or cleaning out.of water with high solids content, the
               solids having accumulated each time water evaporates.

          BWR   boiling water reactor - a nuclear reactor in which water, used as both
               coolant and moderator, is allowed to boil in the core.

          Btu    (British thermal unit) - the amunt of energy necessary to raise the
               temperature of one pound of water by one degree Farenheit, from 39.2 to 40.2
               degrees.

          Capacity - maximum rating of a generating unit most often in Kw or Mw..

          Capacity factor - the ration of the average load on a machine, or equipment, for
               the period of time considered, to the capacity rating of the maching or
               equipment.

          Cooling Systems

               Once through systems     where cooling water is taken from'a suitable source,
                     passed through the condenser, and returned to the source body of water.
                     Same as direct cooling.

               Closed cycle systems - (evaporative cooling) where cooling water is contained
                     in a closed system and its heat dissipated to the air through heat
                     exchangers. Includes dry and wet cooling towers, spray ponds, canals,
                     mechanical draft, etc.

          Core meltdown - failure in control mechanism or cooling system of nuclear        reactor
               which results in nuclear pile going super-critical with meltdown and
               rupture of the reactor vessel potentially occurring.

          Efficiency - (heat rate) - measure of how effectively a tlermal'ge'nerating station
               is operating, generally expressed in Btu per net kilowatt hour. It is
               computed by dividing the total Btu content of1fuel burned for electric
               generation by the resulting net kilowatt hour generation.
<pb n="494" />

                                                         478

                Energy - the-capac,ity for doing work, often measured in kilowatt hours.

                Energy facility    broad term which includes development, production, conversion,
                      storage, processing, transfer or transportation of any energy resource.
                      These would include refineries, fuel transshipment and storage facilities
                      and electric generating units.

                EHV lines - transmission lines which have a rated capacity above and including
                      236 kilovolts.

                Generating facility " broad term encompassing all types of electric generating
                      facilities.

                Interm6diate load plant - a generating    unit that is normally operated to provide
                      power for loads between base load   and peak load levels.

                kW    MW - GW.-  (kilowatt, megawatt, gigawatt) instantaneous measure of electric
                      power equal to 1,000  watts, I million,watts, and 1 billion watts, respectively.

                kWh   Kilowatt hour - the   basic unit of electric energy equal to one kilowatt
                      of power supplied to  or taken from an electric current steadily for one hour.

                Load center - a point at which the load of a'given area is assumed to be concen-
                      trated.

                Load factor - the ratio of the average load in kilowatts, supplied during a
                      designated period, to the peak or maximum load in kilowatts occurring in
                      that period.

                LWR - light water reactor - a nuclear.reactor which uses water (H20) to transfer
                      heat from the fissioning of uranium to a steam turbine.

                Load  schedule - same as load curve - a curve of demand versus time of occurrence
                      in chronological sequence the magnitude of the load for each unit of time
                      of the period covered.

                Makeup water - that quantity of water added to a closed cycle.cooling system
                      needed to replace water lost through evaporation or blowdown.

                Nektonic - swimming organisms able to navigate at will.

                Particulates    microscopic pieces of solids which emanate from a range of
                      sources and are the most widespread of all substances usually considered
                      air pollutants.

                Peak demand - same as peak load - the maximum load in a stated period of time.

                Peaking faci 'lity - same as peaking generation - same as peaking unit - a unit
                      which is normally operated only to provide power during high demand periods.

                Plant factor    same as capacity factor.
<pb n="495" />

                                             -479

        Planktonic    floating organisms whose movements are more or less dependent on
              currents.

        Power - the time rate at which work is done or energy emitted or transferred,
              measured instantaneously in kilowatts.

        Power plant    same as generating facility

        Power pool   regional grouping,of utilities to promote reliability, production
              and transmission of electricity.

        PWR   Pressurized'water reactor - a nuclear reactor in which heat is transferred
              from the core to a heat exchanger by water kept under high pressure to
              achieve high temperature without boiling in the primary system. Steam is
              generated in the secondary system.

        Reliability councils - coordinate in varying degrees the planning, construction,
              and operation of transmission and generating facilities of groups of
              utilities. They effect an adequate supply of low-cost power.

        Reserve margin - same as reserve capability-the difference between net system
              capability and system maximum load requirements.

        Slurry pipeline - mixture of coal and water transported in pipelines.

        Unit-train   a train dedicated to transporting one commodity fr om source to
              user.
<pb n="496" />

                                               481

                                       REFERENCE LIST

            1.  Illinois State Geological Survey. List of Publications. January, 1974.

            2.  Illinois State Geological Survey. Petroleum Industry in Illinois, 1974.
                1975.

            3.  Illinois State Geological Survey. Illinois Mineral Industry in 1973 and
                Review of Preliminary Mineral Production Data for 1974.. November, 1975.

           .4.  Illinois State Geological Survey; Illinois State Water Survey. Coal and
                Water Resources for Coal Conversion in Illinois. 1975.

            5,  Illinois State Geological-Survey. Coal Resources of Illinois.
               .January, 1974.

            6.  Illinois State Geological Survey; Illinois State Water Survey. Coal and
                Water Resources for Coal Conversion in Illinois. 1975.

            7.  Grand River Basin  Michigan. Comprehensive Water Resources  Study. May, 1970.
                Volume IX, Appensix N - Water Laws.

            8.  Grand River Basin Michigan. Comprehensive Water Resources Study. May, 1970.
                Volume X, Appendix 0 - Economic Base Study.

            9.  Landplan Systems. EHV Transmission Line Routine Manual (for Overhead
                Facilities) - Minnesota. February 4, 1974.

           10.  Ohio Department of Industrial Relations. 1974 Division of Mines Report.

           11.  State of Ohio Power Siting Commission. Final Rules and Regulations.
                March 30, 1974.

           12.  State of Ohio Department of Natural Resources. Division of Geological
                Survey. List of Publications. 1975.

           13.  Pennsylvania, Topographic and Geologic Survey. The Petroleum Industry
                and the Future Petroleum Province in Pennsylvania, 1970, Mineral Resources
                Report M 65. Prepared by Dana R. Kelley, William S. Lytle, Walter R.
                Wagner and Louis Heyman.

           14.  Pennsylvania, Topographic and Geologic Survey.. Oil and Gas Developments
                in Pennsylvania in 1974,.Progress Report 188. Prepared by William S. Lytle.
<pb n="497" />

                                                    482

                15.  Pennsylvania, Bureau of Topographic and Geologic Survey. Coal Reserves
                     of Pennsylvania: Total, Recoverable, and Strippable (January 1, 1970),
                     Information Circular 72. Prepared by William E. Edmunds.

                16.  Pennsylvania, Geological'Survey. Medina and Oriskany Production Along the
                     Shore of Lake Erie, Pierce Field, Erie County, Pennsylvani , Mineral
                     Resource Report 60. 1969. Prepared by D. R. Kelley and W. G. McGlade.

                17.  Wisconsin, Bureau of Environmental and Energy Systems, Engineering
                     Divisiort. Local Economic Impacts of Power Plant Sitina in Wisconsin.
                     Draft Copy. December,, 1975. Prepared by Wisconsin Public Service
                     Commission. Prepared for the Coastal Zone Management Development Program.

                18.  John Carroll University, Carroll Business Bulletin. Coal and the Human
                     Environment in the Next Decade. May 15, 1976. Vol. 16, No. 1

                19.  U.S. Department of the Interior, Geological Survey. Coal Resources of
                     the United States, January 1, 1974, Geological Survey Bulletin 1412.
                     Prepared by Paul Averitt.

                20.  U.S. Bureau of Mines. Supply and Demand for Energy in the United States
                     by States and Regions, 1960 and 1965, Information Circular 8401. 1969.
                     Prepared by Grace N. Broderick. -

                21.  U.S. Department of the Interior,.Bureau of Mines. Mineral Industry
                     Surveys. "Coal--Bituminous and Lignite in 1973.". Prepared in Division
                     of Fossil Fuels, January 4, 1975.

                22.  Baldwin, Pamela L. and Malcolm F. The Conservation Foundation. Onshore
                     Planning for Offshore Oil: Lessons from Scotland. 1975.

                23.  U.S.'Federal Energy Administration. Final Report, Oil and Gas Resources,
                     Reserves, and Productive Capacities, Vol. II. October 1975.

                24.  U.S. Federal Energy Administration. Final Report, Oil and Gas Resources,
                     Reserves, and Productive Capacities, Vol. I., October 1975.

                25.  American Petroleum Institute. Annual Statistical Review, Petroleum
                     Industry Statistics, 1965-1974.   May, 1975.

                26.  Exxon Background Series. Very Large Crude Carriers (VLCCs). November, 1975.
                     Prepared by the'Public Affairs Department of Exxon.Corporation.

                27.  U.S. Bureau.of Mines. Supply and Demand for Energy in the United States
                     by States and Regions, 1960 and 1965.   1969-. Information Circular 8402.
                     (in four parts). 2. Utility electricity, by Franklin P. Hall and Grace-
                     N. Broderick.

                28.  California Stanford gesearch,Institute. The Future Electric Energy
                     Requirements of Michigan's Upper Peninsula 1975-2000. March, 1976.
                     Prepared by Dr. Dennis M. Roha-.
<pb n="498" />

                                               483

          29.   U.S  Federal Power Commission.   The Gas Supplies of Interstate Natural
                Gas Pipeline Companies - 1973.   February, 1975.'

          30.   U.S..Federal Power Commission.   The Gas Supplies of Interstate Natural
                Gas Pipeline Companies - 1971.   December, 1972

          31.   U.S. Federal Power Commission.   The Gas Supplies of Interstate Natural
                Gas Pipeline Companies - 1970.   February,'1972

          32.   U.S.. Bureau of Mines. Supply and Demand for Energy in  the United States
                by States and Regi ons, 1960 and 1965. (In four parts), 4. Petroleum and
                Natural Gas Liquids.   1969. Information Circular 8411. Prepared by
                Lulie H. Crump and Phillip N. Yasnowsky.

          33.   U.S. Bureau of Mines. Supply and Demand for Energy in the United States
                by States and Regions, 1960 and 1965. (In Four Parts) 3. Dry Natural
                Gas. 1969. Prepared by Lulie H. Crump. Information Circular 8403.

          34.   U.S. Federal-Power Commission., Sales by Producers of Natural Gas to
                Interstate Pipeline Companies - 1972.     June, 1974.

          35.   U.S. Energy Research and Development Administration. Nuclear Science
                Abstracts.   'May 31, 1976. Vol. 33, No. 10. Abstracts 22697-25337.

          36.   Energy Research and Development Administration; Federal Energy
                Administration.. Energy Abstracts for Policy Analysis. May, 1976.
                Vol. 2, No. 5.  Abstracts 699-897. Prepared by Oak Ridge National
                Laboratory and ERDA Technical Information Center.

          37.   Energy Research and Development Administration; Federal Energy
                Administration; Energy Abstracts for Policy Analysis. April, 1976.
                Vol. 2. No. 4. Abstracts 494-698. Prepared by Oak Ridge National
                Laboratory and,ERDA Technical Information Center.

          38.   U.S. Energy Researchand Development Administration; Federal Energy
                Administration; National Science Foundation. Energy Abstracts for
                Policy Analysis. July, 1975. Vol. 1, No. 7. Abstracts 1208-1402.
                Prepared by Holifield National Laboratory and ERDA Technical Information
                Center.

          39.   U.S. Energy Research and Development Administration; Federal Energy
                Administration. Energy Abstracts for Policy Analysis. March, 1976.
                Vol. 2, No. 3. Abstracts 358-493. Prepared by Oak Ridge National
                Laboratory and ERDA Technical Information Center.

          40.   U.S. Energy Research and Development Administration;.Federal Energy
                Administration; National Science Foundation. Energy Abstracts for
                Policy Analysis. November, 1975. Vol 1, No. 11. Abstracts 2036-2249.
                Prepared by Holifield National Laboratory and ERDA Technical Information
                Center.
<pb n="499" />

                                                    484

                41.  U.S. Energy Research and Development Administration; Federal Energy
                     Administration; National Science Foundation. Energy Abstracts for
                     Tolicy Analysis. October, 1975. Vol 1, No. 10. Abstracts 1828-2035.
                     Prepared by Holifield National Laboratory and ERDA Technical Information
                     Center.

                42.  U.S. Energy Research and Development Administration; Federal Energy
                     Administration; National Science Foundation. Energy Abstracts for
                     Policy Analysis. December, 1975. Vol 1, No. 12. Abstracts 2250-2424.
                     Prepared by Holifield National Laboratory and ERDA Technical Information
                     Center.

                43.  U.S. Energy Research and Development Administration; Federal Energy
                     Administration. Energy Abstracts for Policy Analysis. February, 1976.
                     Vol. 2, No. 2. Abstracts 198-357. Prepared by Oak Ridge National
                     Laboratory and ERDA.Technical Information Center.

                44.  U.S. Energy Research and Development Administration; Federal Energy
                     Administration. Energy Abstracts for Policy Analysis. January, 1976.
                     Vol. 2, No. 1. Abstracts 1-197. Prepared by Oak Ridge National
                     Laboratory and ERDA Technical Information Center.

                45.  Argonne National Laboratory. Regional Studies Program. Regional Energy
                     Modeling: An Evaluation of Alternative Approaches. June, 1975.
                     Prepared by Alan S. Cohen and Kenneth W. Costello, Energy and Environmental
                     Systems Division.

                46.  Federal Energy Regulation Study Team. Federal Energy Regulation: An
                     Organizational Study. April, 1974. Prepared for public, Congressional,
                     and agency comment by the Federal Energy Regulation Study Team,
                     William 0. Doub, Chairman.

                47.  Argonne National Laboratory. Regional Studies Program. Site: A
                     Methodology for Assessment of Energy Facility Siting Patterns. August, 1975.
                     Prepared by N.A. Frigerio, L. J. Habegger, R. F. King, L. J. Hoover,
                     N. A. Clark, and J. M. Cobian. Prepared for the U.S. Energy Research and
                     Development Administration under Contract W-31-109-Eng-38.

                48.  U.S. Nuclear Regulatory Commission. Nuclear Energy Center Site Survey
                     1975. "Executive Summary." Januray 1976. NUREG-0001-ES.

                49.  U.S. Nuclear Regulatory Commission. Nuclear Energy Center Site Survey
                     1975. "United States Map - Coarse Screening Results." January, 1976.
                     NUREG-0001, Appendix A, Part I.

                50.  U.S. Nuclear Regulatory Commission. Nuclear Energy Center Site Survey
                     1975. "The U.S. Electric Power System and the Potential Role of Nuclear
                     Energy Centers." January, 1976. NUREG-0001, Part II of V.

                     U.S. Nuclear Regulatory Commission. Nuclear Energy Center Site    Survey -
                     1975. "Technical Considerations." January, 1976. NUREG-0001, Part III of V.

                52.  U.S. Nuclear Regulatory Commission. Nuclear Energy Center Site Survey - ,
                     1975. "Summary and Conclusions." January, 1976. NUREG-0001, Part I of V.
<pb n="500" />

                                               485

           53.  U.S. Nuclear Regulatory Commission. Nuclear Energy,Center Site
                .Survey - 1975. ."Resource Avgilability and Site Screening." January, 1976.
                NUREG-0001, Part V of V.

           54.  U.S. Nuclear Regulatory Commission. Nuclear Energy Center Site
                Survey - 1975. "Practical Issues of Implementation." January, 1976.
                NUREG-0001, Part IV of V.

           55.  Lovins, Amory B., John H. Price. Non-Nuclear Futures. "The Case for an
                Ethical Energy Strategy." 1975

           56.  U.S. National Science Foundation. The Northeastern States Confront the
                Energy Crisis. Undated. Papers of The Regional Response to the Energy
                Crisis - A Conferenceof Legislative Leaders from the Northeastern States.

           57.  U.S. Geological Survey. Assessment of Geothermal Resources of the
                United States - 1975. Geological Survey Circular 726. 'Ed. by D.R. White
                and D. L. Williams.

           58.  Federal Energy Administration; National Energy Information Center.
                Monthly Energy Review. April,  1976.

           59.  U.S. Federal.Energy Administration. Energy Information in the Federal
                Government.. "A Directory of Energy Sources Identified by the Interagency
                Task Force on Energy Information." Prepared by Policy and Analysis,
                .Office of Data and Analysis. 1975.,         @ -1

           60.  U.S. Council on Environmental Quality. Envirorunental Quality - 1975. 1975.

           61.  The Massachusetts Institute of Technology. The Water's Edge. "Critical
                Problems of the Coastal Zone." 1972. Edited by Bostwick H. Ketchum.

           62.  U.S.. Department of the Interior. Energy Perspectives. February, 1975.

           63.  The Mitre Corporation. Environmental Control Technology Health and
                Environmental Effects - @rogram Overviews. December, 1975. Prepared
                .for Office of Energy, Minerals, and Industry Office of Research and
                Development Environmental Protection Agency.

           64.  U.S. Federal Energy Administration. National Energy Outlook. "1976
                Executive Summary." 1976,.

           65.  Energy. Economics and Engineering News, Interpretation, Analysis.
                Winter, 1976. Vol. 1, No. 2.

           66.  Federal Energy Administration; National Energy Information Center.
                Mdnthly Energy Review. March, 1976.

           67.  Federal Energy Administration; National Energy Information Center.
                Quarterly Report: Third Quarter 1975. Energy Information Report to
                Congress.

           68.  Metropolitan Petroleum Company.  Power from Oil. Spring, 1976.

           69.  U.S. Nuclear Regulatory Commission. Nuclear Energy Center.Site Survey.
                March 13, 1975. NUREG - 75/018.
<pb n="501" />

                                                  486

              70.  U.S. Department of the Interior. Alaska Natural Gas Transportation
                   System.. "Final Environmental Impact Statement - Alaska." March, 1976.

              71.  U.S. Department of the Interior. Alaska Natural Gas Transportation
                   System. "Final Environmental Impact Statement - Canada." March, 1976.

              72.  Tri-State Regional Planning Commission. The Economics of Energy.
                   "Alternative Strategie's for Conserving a Dwindling Regional Resource."
                   February,.-1974.

              73.  U.S. Energy Research and Development Administration. ERDA Research
                   Abstracts. Vol. 1,.No. 1. Abstracts 1-999, January, 1976.

              74.  U.S. Federal Power Commission. Alaska Natural Gas Transportation...Systems.
                   "Final Environmental Impact Statement." April, 1976.

              75.. The University of Michigan, Institute of Science and Technology.
                   A New Industrial Potential: Michigan's Growing, Hydrocarbon Base for
                   Industrial Energy and Petrochemical Feedstocks. April, 1976. By
                   Lawrence T. Harbeck, Assoc. Research Scientist; Marian J. Krzyzoweki,
                   Research Associate; Paul S. Dobbins, Research Assistant.

              76.  U.S. Federal Highway Adminisfration.@. -Energy Conservation in Transportation
                   and Construction.   December 2-5, 1976. Conference Report.

              77.  Morgan, M. Granger. Energy and Man: Technical and Social Aspects of
                   Energy. 1975.

              78.  Great Lakes Basin Commission4 Great Lakes Basin  Framework Study, Appendix
                   10: Power. 1915.

              79.  U.S. Department of the Interior. The Need for a National System of
                   Transportation and Utility Corridors. July 1, 1975.

              80.  Argonne National Laboratory, Energy and Environmental Systems Division.
                   Energy Related Regional Studies Program. November, 1974.

              81.  Great Lakes Environmental Laboratory, NOAA, U.S. Department of Commerce.
                   (under contract with the Great Lakes Basin Commission). 1976 Great Lakes
                   Directory, March, 1976. Prepared for the Interagency Committee on Marine
                   Sciences and Engineering Federal Council for Science and Technology.

              82.  U.S. Department of the Interior, Bureau of Mines. The Mineral Industry
                   of New York. 1969.

              83.  Crude Petroleum - Producing Oil Wells, 1970 and 1972, Production, 1961 to
                   19,73, and Proved Reserves, 1960, 1970, and 1973, By States. Source: U.S.
                   Bureau of Mines, Minerals Yearbook, and-unpublished data.

              84.  U.S. 94TH Congress, 1ST Session, Joint. Minnesota's Energy Outlook, Hearing
                   before the Joint Economic Committee Congress of The United States Ninety-
                   Fourth Congress, First Session. October 14, 1975.
<pb n="502" />

                                                        487

              85- U.S. Department of,the Interior, Bureau of Mines. The Mineral Industry
                    of Indiana. 1972..

              86. Coal Section Indiana Geological Survey. Coal Reserves of Indiana.
                    .January 1, 1965.

              87.   Department of Natural Resources, Geological Survey Mineral Economics
                    Series 21. Oil Development and Production in Indiana During 1974. 1975.

              88.   Frund, Eugene. Natural Gas - Pennsylvania. July 11, 1975.

              89.   Department of Natural Resources. Steam Electric Power.Generating. July,
                    1975.

              90.   Bishop, Richard C. and Daniel L. Vogel. Power Plant Siting on Wisconsin's
                    Coasts a Case Study of a Displaceable Use. Coastal Zone Management Journal
                    (forthcoming) .

              91.   Public Service   Commission of Wisconsin. Findings of Fact, Certificate
                    and Order. March 27, 1975.

              92.   Minnkota Messenger. Some Serious Talk on the Energy Situation. January
                    24, 1975.

              93.   U.S. Energy   Research and Development Administration. Geothermal Energy.

              94.   U.S. Energy   Research and Development Administration. The Energy Crisis.

              95.   Argonne National Laboratory Regional Studies Program.. Energy an
                    Environmental Assessments. No. 1. December, 1975.

              96.   Federal Energy Administration. Energy Reporter, Feburary,.1976.

              97.   Federal Energy Administration. Energy Reporter. May, 1976.

              98.   Great Lakes Commission, Institute of Science and Technology. Great Lakes.
                    News Letter. Vol. XX, No. 3. January - Feburary 1976.

              99.   U.S. Energy Research and Development Administration. The Economics of
                    America's Energy Future. 1975.

             100.   U.S. Department of Commerce. Commerce America. April 26, 1976., "U.S.
                    Fishery Conservation Zone 200 Miles Offshore Preserves Vital Resource."
                    Pg. 11.

             101.   94th Congress, 2d Session.. Synthetic Fuel Commercial DemonstrationFund
                 -  Supplemental Appropriation. Communication from the President of the
                    United States. House Document No. 94-425. March 25, 1976.

             102.   U.S. Energy Research and Development Administration. Creating Energy
                    Choices for the Future.

             103.   Resources-for the Future, Inc. Towards a Responsible Energy Policy. 1975.
<pb n="503" />

                                                          488

                104.   Resources for the Future, Inc. Limiting the Demand for Energy: Possible?
                       Probable? July, 1974.

                105.   American Enterprise Institute. The Future of the Electric Utilit           .ies.
                       Reprint No. 31. April, 1975..

                106.   Department of the Interior, U.S. Fish and Wildlife Service. National
                       Power Plant Team. March, 1976.

                107.   White, David C. Ener y Consumption and Electric Supply Influence                 1972.
                       NEREM - Vol. 14.

                108.   Power Plants in the Great Lakes Basin.

                109.   Energy Research and Development Administration. Nuclear Energy, Questions
                       About Nuclear Power. May 14, 1976.

                110.   U.S. Energy Research and Development Administration. Fusion. 1975.

                111.   Public Service Electric and Gas Company. Nuclear Energy, Questions and
                       Answers. 1976.

                112.   Federal Energy Administration., Energy Reporter. Special Nuclear Issue,
                       March, 1976.

                113.   Atomic Industrial Forum, Inc. National Environmental Studies Project.
                       Vol. 4, No. 2. March/April 1976.

                114.   93D Congress, 2d Session. Energy Supply Act of 1974. Senate Report No.
                       93-1140. September 9, 1974.

                115.   94th Congress, lst Session. Energy Independence Authority Act of 1975.
                       Communication from the President of the United States. House Document
                       No. 94-284. October 20, 1975.

                116.   Science.   -Transportation Energy Conservation Policies. Vol. 192, No.
                       4234. April 2, 1976.

                117.   Inman, Donald L. Preliminary Assessment of Potential Great Lakes Offshore
                       Oil and Gas Operations. November, 1973.

                118.   Union Carbide Corporation. Synthetic Natural Gas(SNG). December, 1975.

                119.   Union Carbide Corporation. The U.S. Electric Power Supply. "A Vital
                       Service to be Wisely Priced." September, 1975.

                120.   Union Carbide Corporation. The Crisis in Natural Gas. December, 1975.

                121.   92nd Congress, S. 3507. Public Law 92-583. Marine Resources and Engineering
                       Development Act of 1966, Amendment. October 27,1972.

                122.   94th Congress, S. 622. Public Law 94-163. Energy Policy and Conservation
                       Act. December 22, 1975.
<pb n="504" />

                                                      489

            123.   94th Congress, lst Session. Conference Report           Energy Policy and
                   Conservation Act. Report No. 94-516. December.8, 1975.

            124.   94th Congress, 2d Session. R.R. 13451. A Bill to improve the Nation's
                   energy resources, by establishing a national power grid system, for the
                   purpose of assuring an adequate and reliable low-cost electric power
                   supply consistent with the enhancement of environmental values. April
                   29, 1976.

            125..  94th Congress, 2d Session. H.R. 13350. A Bill to authorize appropria_@
                   tions to the Energy Research and Development Administration in accord-
                   ance with section 261 of the Atomic Energy Act of 1954, as amended,
                   section 305 of the Energy Reorganization Act of 1974, and section 16 of
                   the Federal Nonnuclear Energy Research and Development Act of 1974, and
                   for other purposes. April 27, 1976.

                   94th Congress, 2d Session. H.R. 13172. An Act making supplemental
                   appropriations for the fiscal year and     'ing June 30, 1976,and the period
                   ending September 30, 1976, and for other purposes. April 26, 1976.

            127.   94th Congress, 2d Session. H.R. 13350. A Bill to authorize appropria-
                   tions to the Energy Research and Development Administration in accordance
                   with section 261 of the Atomic Energy Act of 1954, as amended, section
                   305.of the Energy Reorganization Act of 1974, and section 16 of the
                 Federal Nonnuclear Energy-Research and Development Act of 1974, and for
                   other purposes. April 27, 1976.

            128.   94th Congress, 2d Session. H.R. 13449. A Bill to amend the Federal
                   Energy Administration Act of 1974 to provide for authorizations of
                   appropriations to the Federal Energy Administration, to extend the
                   duration of authorities under suchAct, and for other purposes. April
                   29, 1976.

            129.   94th Congress,  2d Session. S. 3339. A Bill to        promote more effective
                   management of certain,related functions in@a new Department of Energy
                   and Natural Resources. April 28, 1976.

            130.   94th Congress, 2d Session. H.R. 12207. An Act to amend the Rural
                   Electrification Act of 1936, as amended, to correct unintended inequities
                   in the interest rate criteria for borrowers from the Rural Electrification
                   Administration, and to make other technical amendments. May 4, 1976.

            131.   94th Congress, 2d Session. S. 3105. A Bill to authorize appropriations
                   to the Energy Research and Development Administration in accordance with
                   section 261 of the Atomic Energy Act of 1954, as amended, section 305,of
                   the Energy Reorganization Act of 1974, and section 16 of the Federal
                   Nonnuclear Energy Research and Development Act of 1974, and for other
                   purposes. March 9, 1976,

            132. 94th Congress, 2d Session. H.R. 13410. A Bill to create within'the
                   Energy Research and Development Administration the position of Assistant
                   Administrator for Solar and Geothermal Energy and Conservation, and for
                   other purposes. April 28, 1976.
<pb n="505" />

                                                         490

              133.   94th Congress, 2d Session. S. 3107. A Bill to authorize appropriation             -s
                     to the Nuclear Regulatory Commission in accordance with section 261 of
                     the Atomic Energy Act of 1954, as amended, and section 305 of the Energy
                     Reorganization Act of 1974, as amended, and for other purposes. March 9,
                     1976.

              134.   94th Congress, 2d Session. H.R. 12387. A Bill to authorize appropria-
                     tions to the Nuclear Regulatory Commission in accordance with section
                     261 of the Atomic Energy Act of 1954, as amended, and section 305 of the
                     Energy Reorganization Act of 1974, as amended, and for other purposes.
                     March 9, 1976.

              135.   94th Congress, 2d Session. S.J.RES. 126. Joint Resolution consenting
                     to an extension and renewal of the interstate compact to conserve oil
                     and gas. May 4, 1976.

              136.   94th Congress, 2d Session. S. 3362. A Billto provide authorization for
                     a United States contribution to the International Atomic Energy Agency
                     in support of its safeguards activities and for other purposes. May 3,
                     1976.

              137.  '94th Congress,,2d Session. H.R. 12168. A Bill to           amend the National
                    .Gas Pipeline Safety Act of 1968 to authorize appropriations for fiscal
                     year 1977. February 26, 1976.

              138.   94th Congress, 2d Session. H.R. 13220. A Bill to amend the Natural
                     Gas Act to authorize a natural gas pipeline from the North Slope of
                     Alaska through Canada to the contiguous forty-eight States. April 13,
                     1976.

              139.   94th Congress, 2d Session. S. 3310. A Bill to conserve electric energy,
                     to reform electric utility rate regulation, to strengthen State electric
                     utility regulatory agencies, and for other purposes. April 13, 1976.

              140.   94th Congress, 2d Session. S. 3341. A Bill to abolish the            Federal
                     Energy Administration. April 29, 1976.

              141.   94th Congress, 2d Session. S. 2872. Amendment intended to be proposed
                     by Mr. Pell to S. 2872, a bill to amend the Federal Energy Administratiofi
                     Act of 1974 to extend the expiration date of such law until September
                     30, 1979, and for other purposes. April 29, 1976.

              142.   94th Congress, 2d Session. S. 3311. A Bill to amend the Federal Power,
                     Act, to provide coordinated longrange planning and facility siting in
                     the electric utility industry, and for other purposes. April 13,           1 1976.

              143.   94th Congress, 2d Session. H.R. 13350. A Bill to authorize appropria-
                     tions to the Energy Research and Development Administration in accord-
                     ance with section 261 of the Atomic Energy Act of 1954, as amended,
                     section 305 of the Energy Reorganization Act of 1974, and section 16 of
                     the Feder&amp;l Nonnuclear Energy Research and Development Act of 1974, and
                     for other purposes. April 27, 1976.
<pb n="506" />

                                                      491

           144.   U.S. 94th Congiess,-ls    t Session, Senate. Energy Facility Siting,in
                  Costal Areas. (Committee Print for Senat           ommittee on Commerce).
                  U.S.G.P.O. , 1975.

           145.   Shafer, Chris A. Power Plant-Siting        Issues_and Policies for the Great
                  Lakes Costal Zone. Prepared for the        Great Lakes Basin Commission
                  Standing Committee on Costal Zone Management. February 3, 1975.-
           146.   U.S. Geological@Survey. Resource and Land Investigations (RALI)            Pro-
                  gram: Methodologies for Environmental Analysis. Vol. III: "Power
                  Plant Siting." 1 19.2:       R13.

           147.   Wisconsin University Sea Grant Program. The Great Lakes Transportation
                  Syste . Technical Report 9230. January, 1976.

           148.   U.S. National Science Foundation. Assessment of Energy Parks vs Dispersed
                  Electric Power Generating Facilities, Final Report. Vol. II. May 30,
                  1975. Report Prepared for the Office of the Science Adviser Energy R&amp;D
                  Policy Office Under Nat   .ional Science Foundation Grant OEP74-22625 A01.

           149.   U.S. National Science Foundation. Assessment of Energy Parks vs Dispersed
                  Electric Power Generating Facilities,-Final,',Report. Vol. I. May 30,
                  1975. Report Prepared fore the Office of        Ithe'Science Adviser Energy
                  R&amp;D Policy Office Under National Science Foundation Grant OEP74-22625 A01.

           150.   New York, Cornell University Center for Environmental Quality Management.
                  Cornell Energy Project: National Energy Needs and Environmental Quality.
                  "Recent State Initiatives on Power Plant Siting: A Report and Comment."
                  February, 1972. Paper No. 72-3.

           151.   New York, Cornell University Center for Environmental Quality Management.
                  Cornell Energy Project: National Energy Needs and Environmental Quality.
                  "New Institutional Arrangements to Resolve Power Plant Siting Conflicts:
                  A Polical-Analysis." February, 1972. Paper No. 72-4.

           152.   New York, Cornell University Center for Environmental Quality Management.
                  Cornell Energy Project: National Energy Needs and Environmental Quality.
                  "Public Utility Investment and Regulatory Practices." January, 1974.
                  Paper No. 14-1.

           153.   New York, Cornell Unive   .rsity Center for Environmental     Quality Management.
                  Cornell Energy Project: National Energy Needs and,Environmental Quality
                  "NEPA: Some Legal Constraints as SetForth by the Court in,Calvert Cliffs."
                  October, 1971. Paper.No. 71-12.

           154.   New York, Cornell University Center for Environmental Quality Management.
                  Cornell Energy Project: National Energy Needs and Environmental quality.
                  "Coal Gasification: A Review. November, 1971. Paper No. 71-15.

           155.   New York, Cornell Univeristy Center for Environmental Quality Management.
                                                                                bir
                  Cornell Energy Project: National Energy Needs-and Env` onmental Quality.
                  "Nuclear Insurance:, An Estimate of the Cost.of the Nuclear Hazard."
                  October, 1971. 'Paper No. 71-13.
<pb n="507" />

                                                          492

               156.    New York, Cornell University Center for,     Environmental Quality Management.
                       Cornell Energy Project: National Energy Needs and Environmental Quality,
                       "Federal Funding for Research and Development of Fossil Versus Nuclear
                       Fuels Used for Civilian Energy Production." October, 1971. Paper NO.
                       71-14.

               157.    New York, Cornell University Center for Environmental Quality Management.
                       Cornell Energy Project: National Energy Needs and Environmental Quality.
                       "Radioactive Waste Management at Nuclear Fuel Reprocessing Plants."
                       February, 1972. Paper No. 72-2.

               158.    U.S. Army Corps of Engineers. St. Paul District. Draft Environmental
                       Impact Statement. "Refined Products Terminal Lakehead Pipe Line Company,
                       Inc. Duluth - Superior Harbor." May, 1975.

               159.    Empire State Electric Energy Research Corporation. 1975 Report of Member
                       Electric Corporations of the New York Power Pool and the Empire State
                       Electric Energy Research Corporation Pursuant to Article VIII, Section
                       149-b of the Public Service Law. Vol. 1. April 1, 1975.

               160.    Empire State Electric Energy Research Corporation. 1975_Report of member
                       Electric Corporations of the New York Power Pool and-the Empire State'
                       Electric Energy Research Corporation Pursuant to Article VIII, Section
                       149-b of the Public Service Law. Vol. 2. April 1, 1975.

               161.    U.S. 94th Congress, lst Session, Senate. Energy Facility Siting in Costal
                       Areas. (Committee Print For The Use of the Committee on Commerce and
                       National Ocean Study Policy Pursuant to S. Res. 222 National Ocean Study
                       Policy). December, 1975.

               162.    State of Florida, Department of Environmental Regulation. Materials
                       Outlining-Florida's Power Plant Siting Program. As pf July, 1976.

               163.    Michigan Congress. House Bill No. 5271. A Bill to regulate the loca-
                       tion of power facilities within this state; to create the state power
                       facility siting council and to prescribe its powerq.        'and duties; to re-
                       quire utilities to prepare certain plans; and to prescribe penalties.
                       May 20, 1975.

               164.    Michigan Congress. House Bill No. 4478. A Bill to provide for review
                       by the Michigan public service commission of plans,         forecasts, and
                       planned expansion of electric and gas utilities; to         provide for the re-
                       gulation by the commission of the location, construction, and operation
                       of certain electric generating plants, certain electric transmission
                       lines, and gas processing plants including holding joint hearings and
                       issuing joint orders with other states or the the United States; to
                       provide for certificates of public convience and necessity and environ-
                       mental compatIbility; to provide for control of costs and operating
                       efficiency of certain electric generating plants and gas processing
                       plants; to premit the commission to enter into interstate compacts; and
                       to prescribe penalties. March 4, 1975.
<pb n="508" />

                                                      493

            165.   Michigan Congress. House Bill NO. 4846. A Bill to regulate the con-
                   struction and use of oil and gas pipeline facilities; to authorize the
                   public service commission toestablish and enforce safety-standards
                   concerning,oil and gas pipelines, gas processing plants, and gas stor-
                   aIge facilities; to provide for rates and tariffs; to-provide for con-
                   demnations; to provide penalties; and to reveal certain acts and parts
                   of acts. April 8, 1975.

           166.   Great Lakes Basin Commission Staff and Great Lakes National Assessment
                  Work Group. State-Regional Future Great Lakes Region: 1975 National
                  Water Assessment (Draft). March, 1976.

           167.   Cornell University,-C.enter for Environmental Quality Management.
                  Cornell Energy Project, National Energy Needs and Environmental Quality.
                  Technology Assessment with Special Reference to Energy, Paper No. 70-1.
                  Written by C.L. Comar, Principal Investigator. October, 1970.

           168.   Cornell University, Center for Environmental Quality Management.
                  Cornell Energy Project, National Energy Needs and Environmental Quality.
                  National Energy Needs and Environmental Quality, Paper No. 71-6.
                  Written by Peter L.,Auer, Principal Investigator. May, 1971.

           169.   Resources for,the Future, Inc. Economics of Thermal Pollution Control.
                  Written by George O.G. Lof and John C. Ward. December, 1970.

           170.   Massachusetts Institute of Ted     hnology. Power, Pollution and Public Policy.
                  M.I.T. Report No. 24. June, 1971.

           171.   U.S. Environmental Protection.Agency. Study of an Integrated Power,
                  Water and Wastewater Utility Complex. EPA-670/2-74-080, Environmental
                  Protection Technology Series. December, 1974.

           172.   Atom Industrial Forum, Inc. Nuclear Environmental Information--Resources
                  and Action Plans. Prepared by Arthur D. Little, Inc. September, 1974.

           173.   Atomic Industrial Forum, Inc. General Environmental'Guidelines for
                  Evaluating and Reporting the Effects of Nuclear Power Plant Site'Prepara
                  tion, Plant:and Transmission Facilities Construction. Prepared by
                  Hittman Associates, Inc. February; 1974.

           174.   Atomic Industrial Forum, Inc. Nuclear Power Plant Siting--A Generalized
                  Process- Prepared by Commonwealth Associates, Inc. August, 1974.

           175.   Atomic Industrial Forum, Inc. Environmental Impact Monitoring of Nuclear
                  Power Plants: Source Book of       Monitoring Methods, Volume 1. Prepared
                  by Battelle/Pacific Northwest      Laboratories/Columbus Laboratories.
                  February, 1975.*

           176.   Atomic Industrial Forum, Inc. Environmental Impact Monitoring f Nuclear
                  Power Plants: Source Book of Monitoring Methods, Volume 2. Prepared by
                  Battelle/Pacific Northwest Laborato-@ies/Columbus Laboratories. February,
                  1975.
<pb n="509" />

                                                            494

                  177.   MAthetmatica. "U.S. Energy Policy Evaluation: Some Analytical
                         Approaches", Energy Policy. Written by Dilip R. Limaye and John R.
                         Sharko. March, 1974.
                  176.   Argonne National''Laboratory. Forecasting the Local Economic Impacts
                         of Energy Resource Development: A Methodological Approach. Prepared
                         for the U.S. Energy.Research and Development Administration under
                         Contract W-31-109-Eng-38. December, 1975.

                  179i   American Nuclear Society. Nuclear Power and the Environment: Questions
                         and Answers. October, 1973.

                  180.   California University, School of Engineering and Applied Science.
                         Public Health Risks of Thermal Power Plants. Prepared for the Resources
                         Agency of California'. May, 1972.

                  181.   Rand Corporation.    'California's Electricity Quandary: 11-Planning for
                         Power Siting. Prepared for the California State Assembly No. R-1115-RF/CSA.
                         September, 1972.

                  182.   U.S. 94 th Congress, lst Session, Senate. Public Works for Water And
                         Power Development and EnergX Research Appropriations. Senate Hearings
                         Beforethe Committee on Appropriations. H.R. 8122. Fiscal Year 1976.
                         Part 3.   1975.

                  183.   U.S. Council on Environmental Quality. Report on 1975 Public Hearings.
                         "Environmental Effects and Energy Conservation Aspects of the Nonnuclear
                         Energy Research, Development, and Demonstration Programs." January, 1976.

                  184.   U.S. Federal Power Commission. The 1970 National Power Survey. Part I
                         of IV. December, 1971.

                  185.   U.S. Federal Power Commission. The 1970 National Power Survey. Part II
                         of IV. 1971.

                  186.   U.S. Federal Power Commission. The 1970,National Power Survey. Part III
                         of IV. 1970.

                  187.   U.S. Federal Power Commission. The 1970 National Power Survey. Part IV
                         of IV. 1972.

                  188.   U.S. Federal Power Commission. Federal Power Act. April 1, 1975.

                  189.   U.S. Federal Power Commission. Annual Report 1974. 1974.

                  190.   U.S. Federal Power Commission. Steam-Electric Plant Construction Cost
                         and Annual Production Expenses, Twenty-S4xth Annual Supplement-- 1973.
                         1975.

                  191.   U.S. Energy Research and Development Administration. Recommended Synthetic
                         Fuels Commercialization Program. Interagency Task Force on Synthetic
                         Fuels Commercialization, Fact Book. November, 1975.
<pb n="510" />

                                                     495

            192.  U.S. Federal   Power Commission. Steam-Electric Plant Air and Water Quality
                  Control Data, For the Year Ended December 31, 1973 Based on FPC Form No.67,
                  "Summary Report." January, 1976.

            193.  U.S. Energy Research and Development Administration. Final Environmental
                  Statement - Liquid Metil Fast Breeder Reactor Program. "Summary and
                  Supplemental Material."     Vol. 1 of 3. December, 1975.

            194.  U.S. Energy Research and    Development Administration.       Final Environmental
                  Statement - Liquid Metal    Fast Breeder Reactor Program.' "Comment Letters
                  and ERDA Responses." Vol. 2 of 3. December, 1975.

            195.  U.S. Energy Research and    Development Administration.       'Final Environmental
                  Statement - Liquid Metal    Fast Breeder Reactor Program. "Comment Letters
                  and ERDA Responses." Vol. 3 of 3. December,, 1975.

            196.  Illinois Coastal Zone Management Program. The Illinois Coastal Zone
                  Management Program: First Year Work Product; Volume I, Legal Analysis.
                  By: Taussig, Wexler, and Shaw, Ltd. Submitted to: The Illinois Coastal
                  Zone Management Program. June, 1975.
            197.  State and Regional Commission. Energy Volume IV: Electrical Energy and
                  Power Plants. Preliminary Draft. July, 1974.

            198.  Mid-America Interpool Network. Electric Power Reliability. Date Unknown.

            199.  Mid-America Interpool Network. MAIN's.1976 Reply to Appendix A-1 of
                  Order No. 383-3. April     1, 1976.

            200.  Flint, Harold J., Division of Geological Survey. Electric Power Trans,-
                  mission System in Ohio: 1974. 1975. In cooperation with Power Siting
                  Commission.
            201.  Ohio Department of Natural Resources. Oil,and Gas Fields of Ohio (Incl!@@
                  Underground Storage Areas). 1974.        In cooperation with Division of Oil
                  and Gas.

            202.  Ohio Department of   Natural Resources. Oil and Gas Pipe Lines in Ohio.
                  1973. Compiled by    Harold J. Flint.

            203.  Environmental Technology Assessment, State of Illinois. Power Facility
                  Siting in the State of Illinois. Part II--Environmental Impacts of Large
                  Energy Conversion Facilities.

                  U.S. Army Corps of Engineers, North Atlantic Division. Northeastern
                  United States Water Supply Study: Preliminary Study of Long-Range Water
                  Supply Problems of Selected Urban Metropolitan Areas. Volume I--Main
                  Report.     Prepared by Anderson-Nichols and Company, Inc. Contract No.
                  DACW 52-71-C-0001. November, 1971.
            205.  94th CongressP lst Session. H.R. 2650. A Bill to increase domestic energy
                  sup-plies and availability; to restrain energy demand; and to prepare for
                  energy emergenciesq and for other purposes. February 4, 1975.
<pb n="511" />

                                                          496

                206.   Federal Energy Administration. Annual State Energy Consumption for FEA
                       'Region V States.' Submitted by Hugh Gardner. May 15, 1976.

                207.   U.S. Atomic Energy Commission. General Environmental Siting Guides for
                       Nuclear Power Plants, Topics and Bases. December 1973.

                208.   U.S. Atomic Energy Commission. Land Use and Nuclear Power Plants, Case
                       Studies of Siting Problems.

                209.   Southern,Insterstate Nuclear Board. Power Plant Siting in the United,States.
                       June, 1976.

                210.   East Central Area Reliability Coordination Agreement. Volume V: Conceptual
                       Planning Projections. A Report by ECAR Bulk Power Members to the Federal
                       Power Commission Pursuant to Docket R-362, Order 383-3. April, 1976.

                211,   Illinois (State) Institute for Environmental Quality. Power Facility Siting
                       in the State of Illinois. Part 1: Siting Regulation Alternatives. 1974.

                212..  East Central Area Reliability Coordination Agreement. ECAR Summary Report
                       .of Permit and Contact Requirements of ECAR Members. 72-EAP-48. 1972

                213.   Illinois (State) Institute for Environmental Quality. Potential Sites for
                       Coal Conversion Facilities in Illinois. October 21, 1974.

                214.   East Central Area Reliability Coordination Agreement. Volume V: Load
                       Projections and Resource Planning. 'A Report by ECAR Bulk Power Members
                       to the Federal Power Commission Pursuant to Docket R-362, Order 383-3.
                       April 1976.

                215. East Central Area      Reliability Coordination Agreement. Volume II: System
                       Performance and Transmission Planning. A Report by ECAR Bulk Power Members
                       to the Federal Power Commission,Pursuant to Docket R-362, Order 383-3.
                       .April 1976.

                216.   East Central Area Reliability Coordination Agreem       ent. Volume III: Area
                       .Controls, Communication, and Emergency Preparedness. A Report by ECAR
                       Bulk Power Members to the Federal Power Commission Pursuant to Docket R-362,
                       Order 383-3. April 1976.

                217.   East Central Area Reliability Coordination Agreement. Volume IV: Liaison
                       .Systems' Data. A Report by the ECAR Liaison,Committee to the Federal
                       Power Commission Pursuant to Docket R-362, Order 383-3. April 1976.

                218.   U.S. 94th Congress. lst Session. Senate. Greater,Coal Utilization.
                       Joint Hearings before the Committees on Interior and Insular Affairs and
                       Public Works. S. 1777. Part 1. June 10 and 11, 1975.

                219.   U.S. 94th Congress. lst Session. Senate. Greater Coal Utilization.
                       Joint Hearings before the Committees on Interior and Insular Affairs and
                       Public Works., S. 1777. Part 3 - Appendix.

                220.   U.S. 94th Congress. lst Session.       Senate. Greater Coal Utilization.
                       Joint Hearings before the Committees on Interior and Insular Affairs and
                       Public Works. S. 1777. Part 2. June 12, 16 and 23, 1975.
<pb n="512" />

                                                     497

          221. U.S. Office of Science and Technology. Considerations Affecting Steam
                 Power Plant Site Selection.

          222.   The Science   and Public Policy Program, University       of Oklahoma. Energy
                 Alternatives: A Comparative Analysis. May 1975.-

          223.   Office of Coal Research, U.S. Department of the Interior. Water Require-
                 ments for a Synthetic Fuels Industry Based on Coal'. Presented at the
                 Workshop-on "Research Needs.Related to Water for Energy" University of
                 Illinois on October 20, 1974. Prepared by Edward Schmetz, Harold Podall, and
                 G. Alex Mills. (from Chris Shafer's files)

          224.   Coal Conversion: Processes, Resource Requirements, and Environmental
                 Impact. (from Chris Shafer's files).

          225.   Johnson, Sue, and Alan Randall. Research Needs on Social, Political and
                 Institutional Aspects of Coal Utilization. (from Chris Shafer's file)

          226.   Carroll, Sidney L. Research Needs on Economic and Resource Management
                 Aspects for Coal Gasification/Liquefaction. Workshop on Research Needs
                 Related to Water for Energy. October 20-22, 1974. (from Chris Shafer's
                 files)

                 Hollenstein, Gene H. Research Needs Related to Hydrologic Aspects
                 of Water for Energy from Large Energy Complexes. Prepared for the OWRT
                 Workshop on "Research Needs Related to Water for Energy," Indianapolis,
                 Indiana, October 20-22, 1974. (from Chris Shafer's files)

          228.   Great Lakes Basin Commission. The Coastal Zone and Power in the Great
                 Lakes Basin. August 1, .1974. Prepared by: Chris A. Shafer. (from
                 Chris Shafer's files)'

          229.   U.S. Bureau of Mines. Effluent Treatment and its Cost for the Synthane
                 Coal-to-S.N.G. Process. Prepared by,Joseph P. Starkey, Jr., Albert J.
                 Forney, William P. Haynes and Kenneth D. Plants. (from Chris Shafer's file)

          230.   Water For Energy Self-Sufficiency. August 1974. Prepared by the United
                 States Water Resources Council. (from Chris Shafer.'s files)

          231.   U.S. Water Resources Council. Water for Energy.Self-Sufficiency Report
                 (from Chris Shafer's files)

          232.   New York. Chapter I: Rules of Procedure, Subchapter-. E. Certificates of
                 Environmental Compatibility and Public Need for Steam Electric Generating.
                ,Facilities.

          233.   New York. Chapter 1: Rules of Procedure, Subchapter E-1. Long-Range
                 Electric System Planning.

          234.   Council of State Governments. States' Role in Radioactive Material
                 Management.. A workshop held D          er 9-11, 1974, in Las Vegas, Nevada.

          235.   Pennsylvania State University. Center for the Study of Environmental Policy.
                 Energy Parks and the Commonwealth of Pennsylvania - Issues and Recommendations.
                 Volume 2: Appendices. July 1975.
<pb n="513" />

                                                            498

                  236.  Pennsylvania Carnegie-Mellon University, School of Urban &amp; Public Affairs.
                       'Power Plant Siting Policy Alternatives for Pennsylvania. May 4, 1976.
                  237. Council of State Governments. State Responses to-the Energy Crisis.
                        March 1974.

                  238.  Council of State Governments. State Energy Management: The California
                        Eneray Resources Conservation and Development Commission. May 1976.

                  239.  Boeing Commercial Airplane Company. Intercity Passenger Transportation
                       .Data: Service and Economic Comparisons@ Volume I. May, 1975.

                  240.  Boeing Commercial Airplane Company. Intercity Passenger Transportation
                        Data': Energy Comparisons, Volume 2. May,         1975.

                  241.  New York Dept. of Transportation. Introductory Materials to the
                        Comprehensive Upstate New York Ports Study. April 8, 1975.

                  242.. New York Dept. of Transportation.         Preliminary Progress Report: New York
                        State Dept. of Transportation Upstate Public'Ports Study. Phase I Report.
                        July, 1975.

                  243.  U.S. Army Corps of Engineers, North Central Division. Great Lakes/St.
                        Lawrence Seaway Traffic Forecast Study. Summary Report. February, 1976.

                  244.  Massachusetts, Berkshire County Regional Planning Commission. Evaluation
                        of Power Facilities: A Reviewer's Handbook.           April, 1974.

                  245.  Texas (University of), Petroleum Extension Service. Introduction to the
                        Oil Pipeline Industry. May, 1966.

                  246.  Texas (University of), Petroleum Extension Service. Oil Pipeline Construc-
                        tion and.Maintenance, Volume II. April, 1973.,

                  247.  Oak Ridge National Laboratory. Ecology and Resource Economics: An
                        Integration and Application of Theory to Environmental Dilemmas.
                        April, 1971.

                  248.  Federal Power Commission. Hydroelectric Power Resources of the United
                        States--Developed and Undeveloped. January 1, 1972.

                  249.  Department of Transportation. Energy Primer: Selected Transportation
                        Topics. 1975.

                  250.  Michigan University, Dept. of      Naval Architecture and Marine Engineering.
                        Optimum Capacity of Ships and      Port Terminals. December, 1973..

                  251.  Wisconsin University, Center      for Great Lakes Studies. Wisconsin's Great
                        Lakes Ports: Background and       Future Alternatives. July, 1975.

                  252.  Michigan Geological Survey.       Michigan's Oil and Gas Fields, 1974. 1975.
<pb n="514" />

                                                         499

            253.   New York Power Authority. Greene County Nuclear Power Plant Environmental
                   Report, Construction Permit Stage, Vol. 1. 1975.

            254.   New York Power Authority. Revision No. 1, Green           e County Nuclear Power
                   Plant Environmental Report, Construction Permit Stage, Vol. 1. 1975.

            .255.  New York Power Authority. Revision No. 2, Greene County Nuclear Power
                   Plant Environmental Report, Construction Permit Stage, Vol. 1. 1975.

            256.   Department of the Interior. Alaskan Natural Gas Transportation Systems:
                   Economic and Risk Analysis, Conclusions and Results. June, 1975.

            257.   Federal Power Commission.       Alaska Natural Gas Transportation Systems
                   Draft Environmental Impact      Statement, Vol. I. November, 1975.

            258.   Federal Power Commission.       Alaska Natural Gas Transportation Systems:
                   Draft Environmental Impact      Statement, Vol. II. November, 1975.

            259.   Federal Power Commission.       Alaska Natural Gas Transportation Systems:
                   Draft Environmental laact       Statement, Vol. III. -November, 1975.

            260.   Department of the Interior. Alaska Natural Gas Transportation System,
                   Final Environmental Impact      Statement: Overview. March, 1976.

            261.   Department of the Interior. Alaska Natural Gas Transportation               System,
                   Final Environmental impact      Statement: North Border. March, 1976.

            262.   Department of the Interior. Alaska Natural Gas Transportation System,@
                   Final Environmental IMact       Statement: Alternatives. March,.1976.

                   Department of the Interior. Alaska Natural Ga          s Transportation System,
                   Draft Environmental Impact      Statement: Part I, Vol. 1, Overview.
                   June, 1975.

            264.   Department of the Interior. Alaska Natural Gas Transportation System,
                   Draft Environmental Impact Statement. Part III, Vol. 1. Canada.
                   June, 1975.

                   Department of the Interior. Alaska Natural Gas Transportation System,
                   Draft Environmental Impact Statement: Part III, Vol. 2, Canada.
                   June, 1975.

            266.   Department of the Interior. Alaska Natural Gas Transportation System,
                   Draft Environmental Impact Statement. Part III, Vol. 3, Canada.
                   June, 1975.

            267.   Department of the Interior. Alaska Natural Gas Transportation System,
                   Draft Environmental Impact Statement: Part V*, Vol. 1, North Border.
                   June, 1975.

            268.   Department of the Interior. Alaska Natural Gas Transportation System,
                   Draft Environmental Impact Statement. Part V, Vol. 2, North@Border.
                   June, 1975.
<pb n="515" />

                                                              500

                   269.  Department of the Interior. Alaska Natural Gas Transportation System,
                         Draft Environmental Impact Statement. Part V, Vol. 3. June, 1975.

                   270.  Department of the Interior. Alaska.Natural Gas transportation System,
                         Draft Environmental Impact Statement. Part VI, Vol. 1,.Alternatives.
                         June, 1975.

                   271.  Department of the Interior. Alaska Natural Gas Transportation System,
                         Draft Environmental Impact Statement. Part VI, Vol.. 2, Alternatives.
                         June, 1975.

                   272.  Department of the Interior. Alaska Natural Gas Transportation System,
                         Draft Environmental Impact Statement, Part VII, Vol. 1, Consultation
                         and Coordination. June, 1975..

                   273.  Rand Corporation. Electricity Generating Cost Model for            Comparison of
                         California Power Plant Siting Alternatives. Prepared for the California
                         State Assembly-with Support From the Rockefeller Foundation. January,
                         1973.

                   274.  U.S. Energy Research and Development        Administration. ERDA Energy Research
                         Abstracts. Vol. 1, No. 6. June, 1976.

                         California (State) Coastal Zone Conservation         Commission. Energy. Adopted
                         January 21, 1975.

                 *276.   California (State) Coastal Zone Conservation         Commission. Energy: An
                         Overview and the Potential for Conservation,         Volume I. Preliminary Draft.
                         Compiled by State and Regional Commission Staff. July, 1974.

                 *277.   Ca lifornia (State) Coastal Zone Conservation Commission. Energy: Petroleum
                         and Natural Gas: Demand and Supply, Volume II. Preliminary Draft.
                         Compiled by State and Regional Commission Staff. August, 1974.

                 *278.   California (State) Coastal Zone Conservation Commission. Energy: Alterna-
                         tive Energy Sources, Volume III., Preliminary Draft. Compiled by State
                         and Regional Commission Staff.

                 *279.   California (State) Coastal Zone       Conservation Commission. Energy: Elec-
                         trical Energy and Power Plants. Preliminary Draft. Compiled by State
                         and Regional Commission Staff.        July, 1974.

                 *280.   California (State) Coastal Zone       Conservation Commission. Energy: Petroleum
                         Development, Volume V. Preliminary Draft. Compiled by State and Regional
                         Commission Staff. July, 1974.

                   281.  Wisconsin University. Center        for Great  Lakes Studies. Center for Great
                         Lakes Studies, Special Report       No. 23: Analysis of International Great
                         Lakes Shipping and Hinterland. April,         1975.'

                   282.  U.S. Army Corps of Engineers. "Origin-Destination Study of             Bulk Commodity
                         Movement, Upper Great Lakes Region",*Chapter III--Minerals Industry. By
                         Paul H. Mutschler and Donald Klyce, Eastern Field Operation Center,
                         Pittsburgh, Pennsylvania. 1972.

                   283.  Water Resources Commission, "Michigan Energy Facilities,Related Laws,
                         Policies, and Regulations.
                      Draft Report not adopted by California (State) Coastal Zone Conservation Commission.
<pb n="516" />

                                                      501

           284.   U.S. Council on Environmental Quality. OCS         Oil and Gas--An Environmental
                  Assessment. A Report to the President by the Council on Environmental
                  Quality. Volume 2. April, 1974.

           285.   U.S. Council on Environmental Quali     ,ty. @OCS Oil and Gas--An Environmental
                  Assessment.' A Report to the President by the Council on Environmental
                  Quality. Volume 4. April, 1974.

           286.   Environmental Protection Agency. Federal Register. "Steam Electric
                  Power Generating Point Source Category", Volume 39, Number 196.
                  October 8, 1974.

           287.   Environmental Protection Agency. Development Document for Best Technology,
                  Available for the Location, Design,, Construction and Capacity of Cooling
                  Water Intake Structures for Minimizing Adverse Environmental Impact.
                  April, 1976.

                  Federal Power Commission. Statistics of Publicly Owned Electric Utilities
                  in the'United States. 1974.

           289.   Federal Power Commission. Steam-.Electric Plant Air and Water Quality
                  Control Data: Summary Report. For the Year Ended December 31, 1973.
                  Based on FPC Form No. 67. January, 1976.

           290.   Lake Carriers. Association. Annual Report: Lake Carriers' Association.
                  1975.
           291.   Bureau of Mines. Fuel and Energy bata: United States by States and
                  Region, 1972. Bureau of Mines Information Circular, 1974.

           292.   California (State) Coastal Zone Conservation Commission. Energy, Tanker
                  Terminals, Refineries, Ing Facilities, Volume VI. Preliminary Draft.
                  Compiled by State and Regional Commission Staff. July, 1974. Draft
                  Report not adopted by California (State) Coastal,Zone Conservation
                  Commission.

           293.   Morris, Greg. Department of Natural Resources.          "Use of Energy Systems
                  Concepts in Evaluating Resource,Management Alternatives inPuerto Rico".
                  Presented at the Joint National Meeting of the Operations Research Society
                  of America, and the Institute of,Management Sciences. October 16-18,
                  1974, San Juan, Puerto Rico.,

                  U.S. Geological Survey. Resource and Land Investigations (RALI).Program
                  Methodologies for Environmental Analysis. Volume III: Power Plant Siting.
                  (Microfish)

           295.   U.S. 94th Congress, 2d Session. H.S. 14236. An Act Making appropriations
                  for public works for water andpower development and energy research,
                  including the Corps of Engineers... June 16, 1976.
<pb n="517" />

                                                           502

                296.   U.S. 94th Congress, 2d Session.       H.R. 14236 (With Amendments). An Act
                       Making appropriations for public,works for water and power,development and
                       energy research, including the Corps of Engineers ...          July 17, 1976.

                297.   U.S. 94th Congress, 2d Session.. H.R. 14394. A Bill to extend the Federal
                       Energy Administration Act of 1974 until September 30, 1976. June 16, 1976.

                298.   U.S. 94tfi Congress, 2d Se   ssion. H.R. 14377. A Bill to establish within
                       the Energy Research and Development Administration a.program of Federal
                       grants to assist States in carrying out solar energy community utility
                       programs. June 15, 1976.

                299.   U.S. Army Corps of Engineers, St. Paul District.          Ship Unloading Facility
                       Lake.Superior and Ishpeming Railroad Co.*,Final Environmental Impact
                       Statement. Presque Isle Harbor, Marquette, Michigan. October, 1974.

                300.   U.S. Atomic Energy Commission. Comparative Risk-Cost-Benefit Study of
                       Alternative Sources of Electrical Energy. Appendix A: -Energy Expenditures
                       Ass'ociated with Electric.Power Production by Nuclear and Fossil Fueled
                       Power Plants. December, 1974.

                301.   Federal Power Commission. The CRO 1974 Generating Unit/Capacity Data
                       Consisting of a PSA Generating Unit.Summary Section, A PSA Generating
                       Unit Detail Section'and an FPC map of the Commission Power Supply Areas.

                302.   Federal Power Commission. The CRO Summary Tabulation by PSA, of 1974
                       Annual Electric Requirements.

                303.   Federal Power Commission. The CRO tabulation of "Scheduled or Planned.
                       Changes in Installed Generating Capacity" dated January 1, 1976.

                .304. Federal Power Commission. The NYRO tabulation of "Summary of Scheduled
                       or Proposed Addition in Capacity" dated January 1, 1976.

                305.   Wisconsin University. Center for Urban Transportation Studies. Studies
                       in Urban Transportation: An Inventory of Organizational Responsibilities
                       for Ports on the Great Lakes. September, 1974.

                 306.  Mid-Continent Area Power Pool. Western Coal Utilization in.the,Mid-
                       Continent Area Power Pool: A Preliminary Assessment Performed for the.
                       Mid-Continent Area Power Pool. Prepared by Bechtel Corporation. May,
                       1975.

                 307. Upper   Midwest.douncil. Northern Great Plains Coal: Conflicts and Options
                       in Decision Making. April, 1976.

                 308. Atomic Energy Commission, Washington. WASH 1345 UNCLAS, "Power Plant Capital
                       Costs; Current Trends and Sensitivity to Economic Parameters'% October,
                       .1974. USAtC Oakridge National Laboratories.
<pb n="518" />

                                                    503

          309.  Sward, John D.    Unitrain Operating Methods and Costs. Presented at the
                University of Michigan, Department of Naval Architecture and Marine
                Engineering, Ann Arbor, Michigan. October 25, 1972.

          310.  Glover, T.O.,.Hinkle, M.E.,     and Riley, H.L. Unit Train      Transportation of
                Coal: Technology and Description of Nine Representative          Operations.
                Information Circular 8444. 1970.

          311.  Petruschell,' R.L. and Salter, R.G. Electricity Generating Cost Model
                for Comparison of California Power Plant Siting Alternatives. Prepared
                for the California State Assembly,with Support from the Rockefeller
                Foundation. January, 1973.

          312.  Anderson, Kent P. and DeHaven, James C. The        Long-Run Marginal Costs of
                Energy. Prepared under grants from the National Science Foundation.
                February, 1975.-

          313.  Atomic Energy Commission and Resources Agency of the State of California..
                California Power Plant Siting Study: Executive Summary            Volume I.
                May, 1973.

          314.  Atomic Energy Commission and Resources Agency of the State of California.
                California Power Plant Siting Study. Volume II. May, 1973.

          315.  Atomic Energy Conmissionand Resources Agency of the State of California.
                California Power Plant Siting Study: Appendixes. Volume III. May, 1973.

          316.  Gordon, Richard L. U.S. Coal and the Electric Power Industry          *   Published
                for Resources for the Future, Inc. By the Johns Hopkins University Press.
                1975.

          317.  U.S. Department of theInterior, Bureau of Mines. 1972 Minerals Yearbook.
                Volume 11. 1974.

          318.  U.S. Department of the Interior, Bureau of Mines. Bitumenous Coal and
                Lignite Distribution, Calendar Year 1975.        Prepared in Division of Fossil Fuels.
                April 12, 1976.

          319.  U.S. Department.of the Interior, Bureau of Mines. Crude Petrol          eum, Petroleum
                Products and Natural Gas'Liquids, December 1975. Prepared in Division of
                Fossil Fuels. April,21, 1976.

          320.  U.S. Department of the Interior, Bureau      of Mines. The Mineral Industry of
                Indiana in 1975. Prepared by the'State       Liaison Program Office. December 31,
                1975.

          321.  Indiana Department of Natural Resources.       Oil Development and Production in
                Indiana During 1974. Geological Survey.Mineral Economics Series 2. 1975.

          322.  Job, Charles A.   'Energy Production, Generation,     and Transportation in the
                Great lakes Region, with Emphasis on Electrical       Energy, Generation in the
                Coastal Zone. Background Paper, Draft. May 10, 1976.
<pb n="519" />

                                                           504

                 323. American Petroleum Institute Annual Statistical Review. Petroleum Industry
                       Statistics. 1965-1974.- Washington, D.C. May 1975-

                 324. The Office of the Ten Year Forecast, Ohio Power Siting Commission.
                       Review of 1975 Forecast Rej_)brts. -January, 1976.

                 325 Federal Energy Administration. FEA Region V Report --- Scheduled Electric
                       Generating Capacity Additions-Steam 1976-1985-

                 326.  U.S. Department of the Interior, Bureau of Mines. Crude Petroleum,
                       Petroleum-Products, and Natural Gas Liquids. 1974. (final summary).
                       Prepared by the Division of Fuels Data. April 1, 1976.

                 327.  U.S. Department of the Interior, Bureau of Mines. Mineral Industry
                       Surveys. Coal-Bitumenous and Lignite in 1974. Prepared in Division of
                       Fossil Fuels. January 27, 1976.

                 328.  Northeast Utilities. What are the 1981-1984 base-load alternativesope
                       to the Northeast Utilities system?

                 329.  U. S. Department of the Interior, Bureau of.Mines.          Long-Distance Coal
                       Transport: Unit Trains or Slurry Pipelines. 1975.

                 330.  U.S. Department of the Interior, Bureau of Mines. Basic Estimated
                       Capital Investment and Operating Costs for Underground Bituminous Coal Mines.
                       1975.

                       U.S. Department of the Interior, Bureau of Mines          Railroad Volume Freight
                       Rates   Evolution and Analysis. By Thomas C. Campbell and Sidney Katell.
                       April 1976.

                 332.  Campbell, Thomas C., Professor of Economics and        Research Associate,
                       Regional Research Institute, West Virginia University. The Coal Slurry
                       .Pipeline: Its Contribution in Meeting the Nation's Energy Requirements.
                       Presented at the Missouri Valley Economic Association Conference, Tulsa,
                       Oklahoma, February 26-28, 1976.

                 333.  Regional Research Institute, West Virginia University. Transporting
                       Western Coal: Unit Train or Slurry Pipeline. By Thomas C. Campbell
                       Reprint Series X, No. 4 from "The Logistics and Transportation Review,
                       Vol. 11, No. 2 (Summer 1975)

                 334.  Regional Research Institute, West Virginia University. Status of Slurry
                       Pipeline Transportation of Bituminous Coal. by Thomas C.-Campbell. -
                       Presented at the Intersociety Conference on Transportation, Atlanta, Ga.
                       July 14-18, 1975.

                 335.  U.S. Environmental Protection Agency. Symposium Proceedings: Environmental
                       Aspects of Fuel Conversion Technology, II. (December 1975, HOllywood, Fla.)
                       June 1976.
<pb n="520" />

                                                     505

            336.  U.S. Environmental Protection Agency. Proceedings: Symposium on Flue
                  -Gas Desulfurization, New Orleans, March 1976. Vol. II. May 1976.

            337.  U.S. Environmental Protection Agency. Proc       eedings@: Symposium on Flue
                  Gas Desulfurization, New Orelans, March 1976, Vol. I. May 1976.

            338.  Tetra Tech, Inc. 1976 Energy Fact Book.

            339.  Cargo, David N. and Bob F. Mallory. Man and his Geologic Environment. 1974.

            340.  Mitre Corporation. Quantitative Environmental Comparison of Coal and
                  Nuclear Generation Workshop Summary. Sponsored by Office of Energy
                  R&amp;D Policy National Science Foundation. September, 1975.

            341.  Mitre Corporation. Electric Utility Financial Problems and Potential
                  Solutions. February7, 1-976.

            342.  Mitre Corporation. Proceedings of Legal and Institutional Problems of
                  Electrical Facility Siting Workshop. June, 1975.

            343.  Mitre Corporation. Legal and Institutional Problems of Electrical
                  Facility Siting. May, 1975.,

            344.  Mitre Corporation. Proceedings of Workshop on Increasing Efficiency and-
                  Effectiveness in Ele@c_trical Power Generation. February, 1976.

            345.  National Science Foundation, Office of the Science Advisor. Minutes and
                  Summary of the First Meeting,,of the Advisory Committee on Energy Facility
                  Siting: Volume I., November 20, 1974.

            346.  National Science Foundation, Office of the Science Advisor. Proceedings
                  of the First Meeting of the Advisory Committee on Energy Facility Siting:
                  Volume II. November 20, 1974.

            347.  National Science Foundation, Office of Energy R&amp;D Policy. An Agenda for
                  Research and Development on Energy Systems: Volume I, Summary and
                  Recommendations. February, 1974.

            348.  National Science Foundation, Office of Energy R&amp;D Policy. Proceedings of
                  Meeting of Advisory Committee on Energy Facility Sit       ing Held on October 24,
                  1975. February, 1976.

            349.  Michigan (State of), Governor's Advisory Commission on Electric Power
                  Alternatives.   'I. Preliminary Report for Public Discussion, Facts and
                  Recommendations. April, 1976.

            350. Pennsylvania State University. Economic Analysis of Coal Supply: An
                  Assessment of Existing Studies     Research Project 335, Key Phase Report.
                  Prepared for Electric Power Research Institute. May, 1975.
<pb n="521" />

                                                           506

                351.  Hoffman-Muntner Corporation. Engineering/Economic Analyses of Coal
                      Preparation with S02 Cleanup Processes for Keeping Higher Sulfur Coals
                      in the Energy Market. Prepared for United States Bureau of Mines.
                      Appendix B: Distribution of N. Appalachian and Midwest Region Coals to
                      Utilities During 1974. June,_1976.

                352. Stiles, C.A.; Carlson, E.S.; and Peterson, T.C. Mining Congress Journal,
                      "Rail Versus Truck Haulage at Erie Mining Co.". May, 1972.

                353.  Burton, Alan K., Bechtel Corp. Society of Mining Engineering. "Capital-
                      and Operating Parameters for Off-Highway Trucks". Part 5 of a five-part
                      series. January, 1976.

                354.  Northeast Power Coordinating Council. Northeast Power Coordinating
                      Council.

                355.  U.S. Federal Energy Administration. Project Independence: Federal Energy
                      Administration Project Independence      Blueprint Transcript of First Public
                      Hearing. Denver, Colorado. August        6-9, 1974.

                356.  U.S. Federal Energy Administration.       Project Independence: Federal Energy
                      Administ@ation Project Independence      Blueprint Final Task Force Report,
                      Water Requirements, Availabilities,      Constraints, and Recommended Federal
                      Actions. November, 1974.

                357. U.S. Federal Energy Administration.        Project Independence: Federal Energy
                      Administration Project Independence      Blueprint'Final Task Force Report,
                      Water Requirements, Availabilities,      Constraints, and Recommended Federal
                      Actions. November, 1974.

                358.  U.S. Federal Energy Administration.       Project Independence: Federal Energy
                      Administration Project Independence      Blueprint Final Task Force Report,
                      Synthetic Fuels from Coal. November, 1974.

                359.  U.S. Federal   Energy Administration.     Pro ect Independence: Federal Energy
                      Administration Project Independence      Blueprint Final Task Force Report,
                      Nuclear Energy. November, 1974.

                360.  U.S. Federal Energy Administration.       Project Independence: Federal Energy
                      Administration Project Independence      Blueprint Final Task Force Report--
                      Finance, Financing Project Independence, Financing Requirements of the
                      Energy Industries, and Capital Needs and Policy Choices in the Energy
                      Industries. November, 1974.

                361.  U.S. Federal Energy Administration.       Pro ect Independence: Federal Energy
                      Administration Project Independence      Blueprint Final Task Force Report,
                      Facilities. November, 1974.

                362.  U.S. Federal Energy Administration. Project Independence: Federal Energy
                      Administration Project Independence Blueprint Final Task Force Report,
                      Energy Conservation in the Manufacturing Sector 1954-1990-.. Volume 3..
                      November, 1974.,

                363.  U.S. Federal Energy Administration.       Project Independence: Federal Energy
                      Administration Project Independence Blueprint Final Task Force Report,
                      Coal. November, 1974.
<pb n="522" />

                                                     507

           364. U.S   Federal Energy Administration. Project         Independence: Federal Energy
                 Administration, Project Independence Report., November, 1974.

           365. U.S. Federal Energy Administration. Project Independence: Federal Energy
                 Administration Project Independence Blueprint Transcript of Second Public
                 Hearing, New York, New York, August 19-22, 1974.

           366.  U.S. Federal Energy Administration     '  Project Independence: Federal Energy
                 Administration, A Summary. November, 1974.

           367.  U.S. Federal Energy Administration. Energy Independence Act of 1975 and
                 Related Tax Proposals, Draft Environmental Impact Statement. March, 1975.

           368.  U.S. Federal Energy Administration. The Data Base: The Potential for
                 Energy Conservation in Nine Selected Industries. Volume 2, Petroleum
                 Refining, First Edition. September, 1974.

           369.  U.S. Federal Energy    Administration. The Analysis of the Economic Environ-
                 ment for the Report    to Congress'on Petrochemicals.

           370.  Radian Corporation.,   Final Report: A Program to Investigate Various
                 Factors in Refinery   Siting. Submitted to Council on Environmental Quality
                 and Environmental Protection Agency. Prepared by Radian Staff. Radian
                 Contract #100-0.29. February 15, 1974.

           371.  State of Maine, Department of Environment Protection. Alteration of
                 Coastal Wetlands. Maine Revised Statutes Annotated, Title 38, Chapter 3.
                 October, 1975.,

           372.  State of Maine., Department of Environmental Protection. Protection and
                 Improvement of Air. Maine Revised Statutes Annotated,Title 38, Chapter
                 4. October, 1975.

           373.  State of Maine, Department of Environmental Protection. Oil Discharge
                 Prevention and Pollution Control. Maine Revised Statutes Annotated,
                 Title 38, Chapter 3. October, 1975.

           374.  State of Maine, Department of Environmental Protection. Protection and
                 Improvement of Waters. Maine Revised Statutes Annotated, Title 38,
                 Chapter 3. October, 1975.

           375.  Anual Area Power Coordinating Group. Davis-Besse Nuclear Power Station
                 Units, No. 2 and   3: Environmental Report, Volume 3.

           376.  State of-Maine., Department of Environmental Protection. Site Location
                 of Development. Maine Revised Statutes Annotated, Title 38, Chapter 3.
                 October, 1975.

           377.  State of Maine, Department of Environmental Protection. Classification
                 of Surface Waters. Maine Revised Statutes Annotated, Title 38, Chapter 3.
                 October, 1975.

           378. U.S. Atomic Energy Commission. Greenwood Energy Center,, Units 2 &amp; 3:
                 Applicant's Environmental Report Construction Permit Stage, Volume 2.
                 1974.
<pb n="523" />

                                                           508

                379.  U.S. Atomic Energy Commission. Greenwood Energy Center, Units 2 &amp; 3:
                      Applicant's Environmental Report Construction Permit Stage, Volume 3.
                      1974.

                380.  Clark, John and Brownell, Willard. Electric'-P        owe.r Plants in  the Coastal
                      Zone:- E.n.vironmental Issues. American Littoral Society Special Publication
                      No. 7. October, 1973.

                381.  Pennsylvania. Drexel University. Environmental Planning Seminar,
                      December 9-13, 1974. Presentation by Peter M. Stern.

                382.  Bureau of National Affairs, Inc. Enei       gy Users Report. 1976.

                383.  U.S. Environmental Protection Agency. Implementation Plan Review for
                      Michigan as Required by the Energy Supply and Environmental Coordination
                      Act. February, 1975.

                384.  U.S. Environmental Protection Agency. Implementation Plan Review for
                      Illinois as Required by the Energy Supply and Environmental Coordination
                      Act. February, 1975.

                385.  U.S. Environmental Protection Agency. Implementation Plan Review for
                      Wisconsin as Required by the Energy Supply and Environmental Coordination
                      Act. March, 1975.

                386.  U.S. Environmental    Protection Agency. Implementation Plan Review for.
                      Minnesota as Required-by the En     ergy Supply and Environmental Coordination
                      Act. March, 1975.

                387.  U.S. Environmental Protection Agency. Implementation Plan Review for
                      Indiana as Required by the Energy Supply and Environmental Coordination
                      Act. December, 1974.

                388.  U.S. Environmental Protection Agency. Implementation Plan Review'for
                      Ohio as Required by the Energy Supply and Environmental Coordination
                      Act. December, 1974.

                389.  Argonne National Laboratory, Energy and        Environmental Systems Division.
                      Air Quality Policy Analysis of Electric       Utilities: A Regional Persp      .ective.
                      By: R. Bright, K. Croke, J. Hoover, K.        Hub, D. Schregardus, and P. Walker.

                390.  Argonne National Laboratory. Energy and Environmental Systems Division.

                391.  Weston Environmental Consultants-Designers. Coal Transshipment Facility,
                      Superior, Wisconsin: Environmental Impact Report. Prepared for ORTRAN,
                      Inc. July, 1974.

                392.  Weston Environmental Consultantg-Designers., Coal Transshipment Facility,
                      Superior, Wisconsin: Appendices. Prepared for ORTRAN,,Inc. July, 1974.

                393.  Michigan (State) Public Service@Commisslon. Environmental Protection,
                      Study. Prepared for the Michigan Public Service Commission. May, 1975.
<pb n="524" />

                                                     509

            394. Michigan (State) Public Service Commission. Michigan Public Service
                  Commission: Evaluation of the Consumers Power and Detroit Edison
                  1974 Load Growth Forecasts. February, 1975.

            395.  Michigan (State) Public Service Commission.       Michigan Public Service
                  Commission: Economic Analysis of Reductions        in Power Plant Construc-
                  tion in Michigan. October, 1974.

            396.  Michigan (State) Public Service Commission.        Summary Report on
                  Proceedings:' Hearings on Electric Energy Availability and System
                  Reliability. September 4-5-6, 1974.

            39.7. Illinois University. Energy Resources    . Center. Nuclear Power in Illinois:
                  Proceedings of the Third Annual     Illinois Energy Conference. September 11-12,
                  1975.

            398.  Illinois University. Energy Resources Center. Energy'Conservation Policy
                  Options for Illinois: Proceedings of the Second Annual Illinois Energy
                  Conference. June 24-25,1 1974.

            399.  U.S. National Science Foundation. Some Considerations in the Use of
                  Cooling Water for Inland Power Plant Sites in California. (microfish)

            400.  U.S. Council on Environmental    Quality. Environmental Impacts, Efficiency,
                  and Cost of Energy Supply and    End Use. Volume II. (Microfish)

            401.  U.S. Council on Environmental    Quality. Environmental Impacts, Efficiency,
                  and Cost of Energy Supply and    End Use. Volume I. (Microfish).

            402.  U.S. Environmental Protection    Agency. By. Charles L. Jedlicka. Nomographs
                  for Thermal Pollution Control    Systems. Prepared for: Office of Research
                  and Development. U.S. Environmental Protection Agency. September 1973.

            403.  Department of Natural Rd.Gources. Oil Development and Production in
                  Indiana During 1975. Geological S     urvey Mineral Economics Series 22.        1976.

            404.  State of Michigan. Governor's Advisory Commission on Electric Power
                  Alternatives. Preliminary Report I.         April 1976.

            405.  Michigan State University Dept. of Resource Development. Michigan G!:eat
                  Lakes Shoreland Zone Boundary Definition. June 1975.

            406.  American Association for the Advancement of Science. Energy: Use
                  Conservation and Supply. 1974,

            40.7. Federal Energy  Administration. National Energy.Information Center.
                  Monthly Energy Review. June 1976.

            408.  Maryland Department of Natural Resources. By Frederick W. Jones. Record
                  of,the Maryland Power Plant Siting Act. "Forecasting theDemahd for
                  Electricity. July, 1976.
<pb n="525" />

                                                           510

               409.  Federal Energy    Administration. Energy Research and Development
                     Adminstration. Energy Abstracts for Policy Analysis. Vol. 2., No. 7.
                     Abstracts 1062-1271. July 1976.

               410.  94th Congress, 2nd Session. House of Representatives            *  Report together
                     with Additional Views (Including cost estimate of the Congressional
                     Budget Office) To accompany H.R. 13676. Report No. 94-1348. National
                     Energy Extension Service Act of 1976. July 19, 1976.

               411.  94th Congress 2nd Session. House of Representatives. Report together
                     with Additional and Dissenting Views. Loan Guarantees for Demonstration
                     of New Energy Technologies. To accompany H.R. 12112. Report No. 94-1170,
                     Part 2. June 18, 1976.

               412.  Information from Ontario Hydra. Energy-Saving Program Cuts Consumption
                     by 15%. August 19, 1976.

               .413. U.S. Geological Survey. (1) Industrial Fuel Conference               October 8-9, 1975.
                     Purdue.University. (2) Update on Fuel Reserves and Resources - 1974-1975.

                     U.S. Geological Survey., (1) Industrial Fuel Conference - October 2-3,
                     1974, Purdue University. (2) Overview of Energy Resources in the Midwest.

               415.  National Electric Reliability Council. 6th Annual Review of Overall Reliabilit
                     and Adequacy of tl@e N. American Bulk Power Systems. July, 1976.

               416.  U.S. Federal Energy Administration. National Energy Information Center.
                     Quarterly Report: Fourth Quarter 1975. Energy Information Report to
                     Congress..

               417.  Channing L. Bete Co., Inc. What Everyone Should Know About Coal
                     Gasification. 1974.

               418.  U.S. Energy Research and Development Administration. Nuclear Science
                     Abstracts. Volume 33, No. 9. Abstracts 19643-22696. May 15, 1976.

               419., U.S. Energy Research and Development Administration. Nuclear Science
                     Abstracts. Volume 33, No. 8, Abstracts 16483-19642. April 30, 1976.

               420.  U..S. Environmental Protection Agency. Program Overviews. "Environmental
                     Control Technology Health and Environmental Effects." December 1975.
               421.  National Electric Reliability Council. Fossil and Nuclear Fuel for
                     Electric Utility Generation: Requirements and Constraints, 1976-1985.
                     June, 1976.

               422.  U.S. Environmental Protection Agency. The Bioenvironmental Impact of a
                     Coal-Fired Power Plant: First interim Report, Colstrip, Montana-
                     December, 1974.      Ecological Research Series. January, 1976.

               423.  U.S. Environmental Protection Agency. The Bioenvironmental Impact of                a
                     Coal-Fired Power Plant: Second Interim Report, Colstrip, Montana-
                     June, 1975. Ecological Research Series. February, 1976.
<pb n="526" />

                                                      511

            424. U.S. Environmental    Protection Agency. The Bioenvironmental Impact of
                 Air Pollution From Fossil-Fuel Power Plants. Ecological Research Series.
                 August, 1974.

            425.-Michigan University. Power Systems Laboratory. A Social Systems
                 Engineering Approach to Electric Power System Planning. By Arthur S.
                 Bechhoefer, Kan Chen, Mark K. Enns. Winter, 1975.

            426. Geological Survey. Circular 645. A Procedure for Evaluating Environmental
                 Impact. By Luna B. Leopold, Frank E. Clarke, Bruce B. Hanshaw, and James R.
                 Balsley. Washington, 1971.

            427. American Nuclear Society. Transactions-Conference on Nuclear Power
                 Plant Siting, August 25-28, 1974. Sponsored by the American Nuclear
                 Society's Power Division and the Oregon Local Section. 1974.

            428. U.S. Federal Energy Administration. Trends in Refinery.Capaci@ty and
                 Utilization.    June, 1976.

            429. The Southern Interstate Nuclear Board. The Objectives and Institutional
                 Mechanisms of a Regional Approach to Nuclear Power Plant Siting. Final,
                 Report. December 15, 1975.

            430. Argonne National Lab)oratory. SITE: A Methodology for Assessment of Energy
                 Facility Siting.PatterTfs. August, 1975.

            431. The University of Michigan, Department of Naval Architecture and Marine
                 Engineering. Great Lakes Transport of Western Coal: Technical and
                 Economic Analysis. Report to Department of Commerce Maritime Administration.
                 By Volker H. Elste and Robert M. Scher. June, 1976.

            432. Argonne National Laboratory. Air Quality Policy Analysis of Electric
                 Utilities: A Regional Perspective. March, 1975.

            433. Argonne National Laboratory. Flue Gas Desulfurization and Its'Alternatives:
                 The State of the Art. By Arthur P. Hurter, Jr. November, 1974.

            434. Isard, Walter. Location and Space-Economy: A General Theory Relating to
                 Industrial Location, Market Areas, Land Use,_Trade, and Urban Structure.

            435. Wisconsin University, Center for Urban Transportation Studies. Studies
                 in Urban Transportation: An Examination of the Effects of Changes in Rail
                 Transport Technology Upon Great Lakes Bulk Shipping Activity.

            436. U.S. Army.Corps of Engineers. Office of the Chief.@ National Shoreline
                 Study. Volume V. June 29, 1973.

            437. U.S. Dept. of Transportation. Energy Statistics: A Supplement to the
                 Summary of National Transportation Statistics. Final Report. August, 1974.

            438. The Mitre Corporation. Energy Self-Sufficiency: How Much and How Soon?
                 March, 1975.
<pb n="527" />

                                                            512

                439.  Orba CorporAtion., Bulk Handling System         Simulation      A Window on Reality.
                      February 26, 1974.

                440.:.Galatin, M.,.Economies of Scale and Technological Change in Thermal Power
                      Generation.

                441.  Environmental.Protection Agency. Reviewing Environmental Impa              ct Statements
                      Power Plant Cooling Systems, Engineering Aspects. October, 1973.

                442.  U.S. Office of Science and Technology. Considerations Affecting Ste m
                      Power Plant'Site Selection.

                443.  U.S. Army Corps of Engineers, St. Paul District. Draft Environmental
                      Impact Statement: Power Plant Discharge Structure,'Delta Stabilization
                      Dike, and On-Land Taconite Tailings Disposal. March, 1976.

                444.  Coordinating Committee for North Central Power Study. North Central
                      Power Study. Report of Phase I, Volume 1. October,, 1971.

                445.  Ohio- Energy Emergency Commission. Final Repo-rt to the General Assembly.
                      October 28, 1975.'

                446.  Argonne National Laboratory.        Methodological Aspects of Forecasting
                      Electricity.Demand. By J.D.        Cavallo, G.C. Krohm and W.T. Pelletier.
                      May 27, 1976.

                447.  Argonne National Laboratory.        Candidate Scenarios for the National Coal
                      Assessment. September 1, 1976.
                448.' New York Power Pool. Nuc"lear Electric        Power for th6'Empire State.
                      June, 1976.

                449.  New York Power Pool. Report of        Member  Electric Systems of the New York
                      Power-Pool. Volume 1. 1976.

               .450.'New.York Power Pool.       "Report of Member,Electric Systems       of-the New York
                      Power Pool. Volume 2. 1976.

                451. Berkshire County Regional Planning        Commission. Evaluation of Power
                      Facilities: A Reviewer.'s Handbook. April, 1974.

                @452. Gilmore, John S. Science, Vol. 1919 "Boom Towns May Hinder Energy Resource
                      Development". Pages 535-540. February, 1976.

                453.  Schuster, Ray..-"PMC Digs, in.to'Build the Breeder", Power.Engineeririg,
                      Pages 59-64. April., 1974.

                454.  Sider, Don. "The Big Boondoggle        at Lordstown", Fortune Magazine.
                      Pages 106-109; 195-196. September,         1969.

                455.  U.S. Federal Power Commission. Federal Power Commission. Annual
                      Report, 1975.

                456.  Baram, Michael S. Environmental Law and the Siting of Facilities:
                      Issues in Land Use and Coastal Zone Management. 1976.
<pb n="528" />

             457. Governorls Advisory Commission on Electric Power Alternatives. Final
                   Report: Facts and Recommendations. August, 1976.

             458. U.S. Department of the Interior. Mining and Minerals Policy. Annual
                   Report of the Secretary of the Interior. 1976.

             459. U.S. Department of the Interior.       Laws  and Regulations Affecting Coal.

             460. Illinois (State) Geological Survey. Direc       tory of Illinois Mineral
                   Producers, 1974. July, 19.76.

             461. U.S. Energy Research &amp; Development Administration. Energy Trails: A
                   Guidebook Describing Energy Sites, Power Plants, Science Museums, and
                   Other Interesting Places.' Volume 1. 1976.

             462.  The Marshall-Wythe School of Law' College of William and Mary in
                   Virginia. William and Mary Law @eview, Volume 16, Number 4. Summer,
                   1975.

             463.  Power Planning Committee, Pacific Northwest River Basins Commission.
                   Reivew of Power Planning in the Pacific Northwest. 1975.

             464.  U.S. Environmental Protection Agency. Who's Who in the Interagency
                   Energy/Environment R&amp;D Program. June, 1976.

             465.  Pennsylvania.:.Electric 'Company. Pennsylvania Electric Company Presentation
                   to Girard Township Supervisors. February 10, 1976.

             466.  ECAR Environmental Advisory Panel. ECAR Summary Report of Permit and
                   Contact Requirements of ECAR Members. November 15, 1972.

             467.  Lentz, Owen A., Executive Manager, ECAR.       Presentation before the
                   Pennsylvania Public Utility'Commission in re Further Hearings on
                   Investigation Docket No. 138 "Investigation Upon the Commission's Own
                   Motion to Determine the Need for Additional Electric Generating Transmission
                   Facilities During the Next Decade". March 10, 1976.
             468.,Oak Ridge National Laboratory. Energy Division, Annual Progress Report--
                   Period Ending December 31, 1974.

             469. Oak Ridge National Laboratory. Energy Division, Annual Progress Report--
                   Period Ending December 31, 1975.

             470.  Oak Ridge National Laboratory. Toward a Regional Power Plant Siting
                   Method: AEC-Maryland Regional Siting Factors Study. FY 1974 Progress.
                   Report.

             471.  U.S. Environmental Protection Agency. Implementation Plan Review for
                   New York as Required by the Energy Supply and Environmental Coordination
                   Act. April, 1975.
<pb n="529" />

                                                          514

               472. U.S. Environmental Protection Agency. Implementation Plan Review for
                     Pennsylvania as Required by the.Energy       Supply and Environmental Coordination
                     Act. 'February, 1975.
               473.,'U.S. Environmental Protection Agency.        National Summary of State Implemen-
                     tation Plan Reviews (Section 4 ESECA),       Volume 1--Synopsis. July, 1975.

               474.  U.S. Environmental Protection Agency.        National Summary of Statte
                     Implementation Plan Reviews (Section 4       ESECA), Volume II--Technical
                     Support Document. July; 1975.

               475.  U.S. Office of Coastal Zone Management. Living Coastal Resources.
               476.  U.S. Environmental Protection Agency. Federal Interagency Energy/
                     Environment Research and Development Program--Status Report II. June,
                     1976.

               477.  Tennessee Valley Authority, Office       of Power. Comparison of Coal-Fired
                     and Nuclear Power Plants for the TVA System. June, 1966.

               478.  Spangler,@Miller B. U.S. Atomic Energy Commission. The Basis for
                     Standards in Cost-Benefit Analysis in Nuclear Power Plant Licensing
                     Actions. November 29, 1973.

               479.  Spangler, Miller B. Division of Nuclear Reactor Regulation, U.S.
                     Nuclear Regulatory    Commission. Probabilistic Methods of AssessinA
                     Risk in Cost-Benefit Analysis,of Nuclear Power Plants and Alternative
                     Energy Sources. June 26, 1975.

               480.  Spangler, Miller B. Cost-Benefit Analysis Branch, U.S. Nuclear
                     Regulatory Commission. An Appraisal of Future Energy.Developments
                     Affecting the National and Regional Economic Outlook for Nuclear-
                     Generated Electricity During the Next Forty Years. March 1, 1976.

               481.  Abel, Fred H. Balancing Environmental Quality, Energy Use and Growth:
                     Difficult Decisions. 1975.

               482.  Abel, Fred H.9, Tihansky,-Dennis P.; Walsh, Richard G. National Benefits
                     of Water Pollution Control. 1975.

               483.  Abel, Fred H. Determining Acceptable Levels         of Health and Environmental
                     Damages. 1975.

               484.  D.P. Cleary, S.N. Salomon, L.A. Pollnow, and        M.B. Spangler. A Preliminary
                     Matrix Model for Quantifying and Balancing the Socio-         -Economic Impact of
                     Alternative Cooling System Technologies for Nuclear Power Plants. 1975.

               485.  Department of Housing and Urban Development. Rapid Growth from Energy
                     Projects: Ideas for State and Local Action. A Program Guide.

               486.  State of California.     'Onshore Impact of offshore Southern California OCS
                     Sale No. 35. Executive Summary.
               487.  Resources and Land Investigations (RALI) Program. Directory to U.            IS.
                     Geological Survey Program Activities in Coastal Areas 1974-76. Geological
                     Survey Bulletin 1428.
<pb n="530" />

                                                      515

           488. Madison Gas &amp; Electric Company, Wisconsin Electric Power Company System,
                 Wisconsin Power &amp; Light Company, and Wisconsin Public Service Corporation.
                 1976 Advance Plan.

           489.  Argonne National Laboratory, Energy and Environmental Systems Division.
                 A Preliminary Program Plan for Community Systems: 'Factors Influencing
                 the Acceptance of New Energy-Efficient Community Design Concepts and
                 Energy Supply Systems. January*, 1976.

           490.  Federal Energy Administration,, Office of Oil and Gas. Crude Oil Supply
                 Alternatives for the Norther    n Tier States. August, 1976.

           491.  U.S. Energy Research and Development Administration. A Preliminary Program
                 Plan for Community Systems: Advanced Technology Mix Energy Systems (ATMES).
                 January, 1976.

           492.  Dr. Paul W. McCracken, William G. Rosenberg, and Dr. Gerald L. Decker.
                 Energy Industrial Center Study. Executive Committee Summary Report and
                 Policy Proposals. Prepared for the Office of Energy R&amp;D Policy, National
                 Science Foundation. June, 1975.

           493.  Bonner &amp; Moore Associates, Inc. Petroleum Supply Alternatives for the
                 Northern'Tier States Through 1977, Volume III, Short-Term Report.
                 August-4,, 1976.

           494.  Stanford Research Institute. Meeting Wisconsin's Energy Requirements---
                 1975 to 2000. Volume 1, Summary and Conclusions. April, 1975.

           495.  Scott, David L. Pollution in the Electric Power Industry: Its Control
               .and Costs.

           496. Brookhaven National Laboratory. A Perspective on the Energy Future
               .of the Northeast: Health and Environmental Impacts of Alternative
                 Energy Futures for the Northeast. March 16-17, 1976.

           497.  Organization for Economic Co-operation and Development. Environmental
                 Damage Costs. Record of a Seminar held at the OECD in August 1972.

           498.  Brookhaven National Laboratory, Departments of-Applied Science and.-
                 Medicine. The Health and Environmental Effects of Electricity Generation.
                 A Preliminary Report by the Biomedical and Environmental Assessment Group.
                 July 30, 1974.

           499.  Meier, Peter M., and Palmedo, Philip F. A Preliminary Assessment of a
                 Hypothetical Nuclear Energy Center in New Jersey. Draft. October, 1975.

           500.  Morgan, M. Granger. Brookhaven National Laboratory. Some Methodological
                 Issues in Estimating the Social Costs of the Energy System. A Preliminary
                 Report. June, 1975.

           501.  Brookhaven National    Laboratory.  ERDA/National Laboratories Workshop on
                 Environmental Effects of Energy     hold at Rockefeller University, New York,
                 New York. September 4-5, 1975.

           502.  New England Regional Commission. Gas Industry Development in_New England:
                 Analysis of Alternatives. Part      IV,, Decision Guidelines and Development
                 Alternatives. November, 1975.
<pb n="531" />

                                                         516

               503. New England Regional Commission. Gas Industry Developm.         ent in New England:
                     Analysis of Alternatives. Parts I, II,JII. November, 1975.

               504..New England Regional Commission. Petroleum Development in New England:
                     Economic and Environmental Considerations.        Volume One of Four Volumes:
                     Executive Summary. November, 1975.

               505.  New England Regional Commission. Petroleum        Development in New England:
                     Economic and Environmental Considerations.        Volume Two of Four Volumes:
                     Modular Results. November, 1975.

               506.  New England Regional Commission. Petroleum Development in New-England:
                     Economic and@Environmental Considerations. Volume Three of FourVolumes:
                     Regional Factors. November, 1975.

               507. New England Regional Commission. Petroleum Development in New England:,
                     Economic and Environmental Considerations. Volume Four of Four Volumes:
                     .Appendices. November, 1975.

               508. New England Regional Commission. Decision Mik        ing.for Energy Facilities
                     in New England: Institutional and Legal Process. December, 1975.

               509. Ohio Power Siting Commission. The Mead Corporation Chillicothe, Ohio
                     Facility Ten Year Electric Demand Forecasts. 1976.

               510. Ohio Power Siting Commission. Duquesne Light Company, 1976. Ten Year
                     Forecast Report Submitted to tb Ohio Power Sit        Iing 'Commission.

               511. Ohio Power Siting Commission. The Cincinnati Gas and Electric Company.
                     Ten Year Forecast Report to the Ohio Power Siting Commission. 1976.

               512.  Ohio Power Siting Commission. Ohio Valley Electric Corporation: Ten
                     Year Forecast Report to the Oldo Power Siting Commission. 1976.

               513.  Ohio Power Siting Commission. Columbus and Southern Ohio Electric
                     Company: Ten Year Forecast Report to the Ohio Power Siting Commission.
                       76.

               514.  Ohio Power Siting Commission. 1975 Key Ohio Electric Utility Statistics.

               515.  Ohio Power Siting Commission. The Cleveland Electric Illuminating Co.
                     Ten Year Forecast Report to the Ohio Power Siting Commission. 1976.

               516.  Ohio Power Siting Commission. Monongahela Power Company Ten-Year Forecast
                     Report to the Ohio Power Sitlaa Commission. April 15, 1976.

               517.  Ohio Power Siting Commission. The Goodyear Tire and Rubber Company,
                     Akron Facility: Ten Year Electric Demand Forecasts. 1976.

               518.   Ohio Power Siting Commission. PPG Industries: Ten Year Forecast
                     Repott to the Ohio Power Siting Commission.

               519.  Ohio Power Siting Commission. Union Carbide Corporation Power Station:
                     Ten Year Forecast Report to the Ohio Power Siting Commission.
                     April 15, 1976.
<pb n="532" />

                                                       517

             520. Institute for Contemporary Studies. No Time to Confuse. A Critique of
                  the Final Report of the Energy Policy Project of the Ford Foundation:
                  A,Time to Choose America's Energy Future. .1975.

             521. U.S. 94th Congress. Ist Session. S     enate. Air Quality and     Stationary
                  Source Emission Control. A Report by the Commission on Natural Resources
                  National Academy of Sciences, National Academy of,Engineering, National
                  Research Council. March, 1975.

             522. Chess er, Al H. Economic Advantages of Transporting Coal by Rail vs.
                  Coal Slurry Pipeline. June, 1976.-

             523. Environmental Protection Agency. Air Quality Implementation Plans:
                  Prevention of Significant Air Quality Deterioration. Federal Register
                  Volume 39, Number 235, Part III.        December 5, 1974.

             524. Environmental Protection Agency. Environmental News. November 27, 1974.

             525. U.S. 91st Congress, H.R. 17255.' The Clean Air Act Amendments of 1970.
                  December 31, 1970.

             526. Commonwealth Associates, Inc., Landplan Systems Division. Environmental
                  Report on the Belle River Power Generating Facilities, St. Clair County,
                  Michigan. Prepared forlthe Detroit Edison Company. April 8, 1974.

             527. Zeni, L.E. Electrical World, "Maryland Pioneers with State Siting Program",
                  April 1, 19       Volume 185, Number 7, p. 30-33.

             528. Central Electricity Generating Board. Modern Power Station Practice.
                  Second Revised and Enlarged Edition. Volume 1.

             529. Decker, Gerald L. The Dow Chemical Company. Power Plant Design            Considera-
                  tions for Energy Conservation. 1975.

             530. Wisconsin University, Institute for Environmental Studies. 1975 Survey
                  of Energy Use in Wisconsin, May, 1976.

             531. U.S. Federal'Power Commission. Alaska Natural Gas Transportation Systems:
                  Final Environmental Impact Statement. September, 1976.

             532. Burlington Northern, Inc. Statement of Louis W. Menk, Chairman and
                  Chief Executive Officer, Burlington Northern Inc., Before the House
                  Committee on Interior.and Insular Affairs. H.R. 1863, 2220, 2553, and
                  2896.

             533. Ohio Power Siting Commission'. Ten Year      Forecast of Electric Generation
                  and Transmission Facilities,- 1976-1986. Submitted by Buckeye Power,
                  Inc. April 15, 1976.

             534. U.S. Federal Power Commission. The Adequacy of Future Electric Power
                  Supply: Problems and Policies. Technical Advisory Committee on the
                  Impact of Inadequate Electric Power Supply. March, 1976.
<pb n="533" />

                                                           518

                       Greenwood, John 0. Gree    nwo-od's Guide to Great Lakes Shipping. April,
                       1975.

                536.   U.S. Army Corps of Engineers. Waterborne Commerce of the United States.
                       Calendar Year 1974.

                537.   New York Coastal Zone Management Program. Land and Water Uses. July,
                       1976.

                538.   U.S. 94th Congress, lst Session, Senate. Air Quality and Stationary
                       -Source Emission Control.. March, 1975.

                539.   U.S. Army Corps of Engineers, St. Paul District.         'Draft Environmental
                       Impact Statement. Units 7, 8,&amp; 9, Presque Isle Generating Station
                       Upper Peninsula Generating Co. March, 1976.

                540.   U.S. Dept. of the Interior. Feasibility of Alternative Means.of
                       Cooling for Thermal Power Plants Near Lake Michigan. September, 1970.

                541.   Bechtel Corporation. Manpower, Materials, and Capital Costs          'for Energy-
                       Related Facilities. Research Sponsored by Brookhaven National Laboratory
                       Associated Universities, Inc. April, 1976.,

                542.   Dukert, Joseph M. Nuclear Power and the Environment. 1976.

                543.   Committee for Economic Development. Nuclear Energy and          National,Security.
                       A Statement by the Research and Policy Committee of the          Committee for
                       Economic Development. September, 1976.

                544.   National Academy of Engineering. Engineering for Resolution of the Energy-
                       Environment Dilemma.       1972.

                545.   Battelle Columbus Lakes, Ohio. Environmental Considerations in Future
                       Energy. April, 1971.

                546.   Argonne National Laboratory. Proceedings of the Second Federal Conference
                       on the Great Lakes. March.25-27, 1975.

                547.   Federal Power Commission. Annual Summary of Cost and Quality of Steam-
                       Electric Plant Fuels 1975. May, 1976.

                548.   National Academy of Sciences. Port Development in the United States.
                       Washington, D.C. 1976.

                549.   Coastal Zone Laboratory. Appendix-A: Eng-in.eering-Economic Analysis of
                       Shore Protection Systems: A Benefit/Cost Model.

                550.   U.S. Bureau of Mines. Long-Distance Coal Transport: Unit Trains or
                       Slurry Pipelines. 1975.

                551.   Detroit Edison. Enrico Fermi Atomic Power Plant, Unit 2. Applicant's
                       Environmental Report Operating License Stage, Volume 2.
<pb n="534" />

                                                         .519

             552.   Wisconsin Electric    Power Company. Environmental       Report: Pleasant Prairie
                    Power Plant, Units    1 and 2,'Volume 1. February,       1975.

             553.   Wisconsin Electric    Power Company. Environmental       Report:. Pleasant Prairie
                    Power Plant, Units 1 and 2, Volume 2. February,          1975.

             554.   Wisconsin University. Institute for Environmental Studies. Energy Systems
                    Forecasting, Planning and Pricing.        Proceedings of a French-American
                    Conference University of Wisconsin-Madison, 23 September - 3 October, 1974.

             555.   U.S. Energy Research &amp; Development Administration. A National Plan for Energy
                    Research, Development &amp; Demonstration: Creating Energy Choices for the
                    Future. Volume 1: The Plan.

             556.   New York. Cornell University. Center for Environmental Quality Mgmt.
                    Cornell Energy_Project. Summary of Present Status of High Voltage D.-C.
                    Transmission,. By Simpson Linke. December,- 1974.

             557.   New York. Cornell University. Center for Environmental Quality Mgmt.
                    Cornell Energy Project. On the Minimum Size of Natural-Draft Dry Cooling
                    Towers for Large Power Plants. By Franklin K. Moore. August, 1972.

             558.   New York. Cornell,.University. Center for Environmental Quality Mgmt.
                    Cornell Energy Project. A Pricing System for Pollution Control. By
                    J.E. Hass. March, 1972.

             559.   New York. Cornell University. Center for for Environmental Quality M              gmt.
                    Cornell Energy Project. A Critique of the New EPA Emission Standards for
                    New Stationary Sources. By C.R. Aleta. October, 1971.

             560.   New York. Cornell University. Center for Environmental Quality Mgmt.
                    Cornell Energy Project. Cost Comparison Between Natural Gasand Electricity.
                    By Rob Hogue. June, 1971.

             561.   New York. Cornell University. Center for Environmental Quality Mgmt            I
                    Cornell Energy Project. Electric Utility Optimum Mix Model. By K.B. Cady
                    and J. Hass. January, 1971.'

             562.   U.S. Nuclear Regulatory Commission. Final Environmental Statement Related
                    to Manufacture of Floating Nuclear Power Plants by Offshore Power Systems.
                    Volume 1. September 1976.

             563.   U.S. Nuclear Regulatory Commission. Final Environmental Statement Related
                    to Manufacture of Floating Nuclear Power Plants'by Offshore Power Systems,
                    Volume 2. September 1976.

             564.   U.S. Bureau of Reclamation. Construc'tion Cost Trends. January 1976.-

             565,   New York Dept. of Transportation.       Upstate Public Ports Study, Volume I,
                    Market Potential: Phase I. September 1976.

             566.   New York Dept. of Transportation.       Upstate Public Ports Study, Volume II,
                    Market Potential: Phase II. September 1976.

             567.   New York Dept. of Transportation.       Upstate Public Ports Study, Volume III,
                    Port Development Plans and,Policies. September 1976.
<pb n="535" />

                                                           520

               568.   Illinois Coastal Zone Management Program. Energy.
               569.   Argonne National Laborator   y. Air Quality Policy Analysis of Electric
                      Utilities: A Regional Perspective. March, 197.5.

               570.   U.S. Nuclear Regulatory Commission. -Regulatory Guide 4.7: General Site
                      Suitability Criteria for Nuclear Power Stations. November 1975.

               571.   Argonne National Laboratory. A Study of Social Costs for Alternative Means
                      of Electrical Power Generation for 1980 and 1990. Prepared for Atomic
                      Energy Commission. February 1973.

               572.   Comar, C.L. and Sagan, L.A. Health Aspects of Energy Production           and
                      Conversion.

               573.   Wisconsin Electric Power Company. Environmental Report: Pleasant
                      Prairie Power Plant, Units 1 and 2, Volume 1. February 1975.

               574.   Wisconsin Electric Power Company. Environmental Report: Pleasant
                      Prairie Power Plant, Units 1 and 2, Volume 2. February 1975.

               575.   Energy Research &amp; Development Administration. Annual Report for 1975:
                      Laramie Energy Research Center. January, 1976.

               576.   Department  of the Interior. Energy Perspectives 2. June 1076.

               577.   Environmental Protection Agency. Fuel and Energy Production by Bioconver-
                      sion of Waste Materials. State-Of-The-Art. August 1976.

               578.   U.S. 94th Congress, 2nd Session. Senate. ERDA Energy Conservation Programs.
                      March 5, 1976.

               579.   U.S. 94th Congress, 2nd Session. Senate. Federal Energy Reorganization:
                      Issues and Options. Report to the Committee on Government Operations.
                      September, 1976.

               580.   Department of the Interior. Leasing and Management of Energy Resources
                      on the Outer Continental Shelf.

               581.   U.S. 94th Congress, 2d Session. Coastal Zone Management Act Amendments of
                      1976. Report of the Committee of Conference on S. 586. June 24, 1976.

               582.   U.S. 92nd Congress, S. 3507. Public Law 92-583: Coastal Zone Management
                     'Act of 1972. October 27, 1972.

               583..  U.S. Army Corps of Engineers. The Port of Chicago, Illinois. Port
                      Series No. 46. Revised 1975.. Washington, D.C.

               584.   U.S. Army Corps of Engineers. The Port.      of Detroit and Ports on-the.
                      Saginaw River Michigan-. Port Series No. 45, Revised 1972. Washington,
                      D.C.

               585.   Department of Transportation. Energy Statistics: A Supplement to the
                      Summary of National Transportation Statistics. August, 1974.
<pb n="536" />

                                                         521

                   U.S. Bureau of Mines.      Minerals Yearbook 1973.. Volume II, Area Reports:
                   Domestic. Washington,      D.C. 1976.

            587    National Aeronautics and Space Administration.          ECAS--Westinghouse Phase I
                   Final Report. Volume I-Introduction and Summary-and General Assumptions.

            588.   National Aeronautics and Space Administration.          ECAS--Westinghouse-Phase-I
                   Final Report. Volume II-Materials Considerations..

            589.   National Aeronautics and Space Administration.          ECAS--Westinghouse'Phase I
                   Final Report. Volume III--Combustors,-Furnaces          and Low BTU Gasifiers.

            590.   National Aeronautics and Space Administration.          ECAS--Westinghouse Phase I
                   Final Report. Volume IV--Open Recuperated and          Bottomed Gas Turbine Cycles.

            591.   National Aeronautics and Space Administration.          ECAS--Westinghou-se Phase I
                   Final Report. Volume V--Combined Gas-Steam Turbine Cycles.

            592.   National Aeronautics and Space Administration.          ECAS--Westingho  use Phase     I
                   Final Report. Volume VI".-Closed-Cycle Gas Turbine Systems..

            .593.  National Aeronautics and.Space Administration.          ECAS--Westinghou§e Phase I
                   Final Report. Volume VII--Metal Vapor Rankine Topping-Steam And Bottoming
                   Cycles.

            .594.. National Aeronautics and Space Administration...        ECAS--Westinghouse Phase I
                   Final Report. Volume.VIII---@Open-Cycle MHD.

            595.   National Aeronautics and Space Administrationi          ECAS-Westinghouse Phase I
                   Final Report. Volume IX--Closed-Cycle MHD.

            596.   National Aeronautics and Space Administration.          ECAS--Westinghouse     Phase-I
                   Final.Report. Volume X--Liquid-Metal,MHD-Systems.

            597.   National Aeronautics and Space Administration.          ECAS--Westinghouse    Phase I
                   Final Report. Volume XI--Advanced Steam Systems.

            598.   National Aeronautics and'Space-Administration.          ECAS--Westi  ngh6use Phase     I
                   Final Report. Volume XII--Fuel Cells.

            599.   U.S. DPA. Methods for Identifying and Evaluating the          Nature  and  Extent of
                   Nonpoint.,Sources of Pollutants. 1973.

            600.   Peelle, Elizabeth. Socioeconomic Effects of Operating          Reactors on Two Host
                   Communities: A Case Study of Pilgrim and Millstone.. Presented at
                   Conference on Land Use and Nuclear Facility Sit,.ing: Current Issues.
                   Sponsored by Atomic Industrial Forum, Denver, Colorado. July 18-21, 1976.

            601. Peelle, Elizabeth. Social Effects of Nuclear Power Plants. 1974.

            602. Young' Loise B-. Power Over People. 1973.
<pb n="537" />

                                                             522

                603.   Department of the Interior.       Water Quality Critera.      Report of National
                       Technical Advisory Committee.

                604.   Department of the Interior. Bituminous Coal and Lignite Distribution
                       Calendar Year 1975. April 12, 1976.

                605.   World Ports/American Seaport. "Superior's Mammoth Coal Terminal.
                       September, 1975.

                606.   U.S. Army Corps of Engineers. Ports on Lake Michigani Part 2. 1974.

                607.   Great Lakes Basin Commission. Appendix 12: Shore Use and Erosion

                608.   Consumers Power Company. Environmental Report, Volume 3: Quanicassee
                       Plant, Units 1 &amp; 2. February,.1974.

                609.   Eichholz, Geoffrey. Environmental Aspects of Nuclear Power.

                610.   New York State University. Sea Grant Project. Visual Quality and the
                       .Coastal Zone: Conference Proceedings.

                611.   U.S. Department of the Interior. The Need for a National System of
                       Transportation and Utility Corridors. July 1,,1975.
                612..  U.S. Department of the Interior. Environmental Criter          Iia for Electric
                       Transmission Systems. 1970.

                613.   Special Committee on Electric Power and the Environment. Electricity and
                       .the Environment: The Reform of Legal Institutions. A Report of the
                       Association of the Bar of the City of New York.

                614.   U.S. Atomic Energy Commission. Final Environmental Statement. Related to
                       Operation of Davis-Besse Nuclear Power Station, Unit 1. Proposed by
                       Toledo Edison Company. October 1975.

                615.   Armstrong,.John R. and Bensky, Lawrence. Energy: The Institutional
                       Question. February, 1975.

                616.   U.S. 94th Congress. 2nd Session. Senate. Land Use and Energy: A Study
                       of Interrelationships. January,1976.

                617.   Edsall, T.A. "Electric Power Generation and Its Influence on Great Lakes
                       Fish". By Argonne National Laboratory: Proceedings of the Second Federal
                       Conference on the Great Lakes.

                618.   Asbury, J.G. "Future Fossil Energy Requirements in the Great Lakes Basin
                       State."  Argonne National Laboratory: Proceedings of the Second Federal
                       Conference on the Great Lakes.
<pb n="538" />

                                                      523

             619.  Wisconsin Planning Office. Energy: The Institutional Question.
                   Prepared by Lawrence Bensky and John R. Armstrong. February 1975.

             @620. Federal Power Commission. The       Thermal Component of Atlantic Coast
                   Estuarine Environments. 1974.

             621.  Federal Power Commission. Energy Technology III: Regional Energy
                   Systems-Planning. 1976.
             622. A Statement of Concerns and Suggested Ecological Research, Report
                   No. 1 of the Lake Michigan Cooling Water Studies Panel. Panel supported
                   by the United States Environmental Protection Agency, Region V, and the
                   Pollution Control Agencies.of Illinois, Indiana, Michigan, and Wisconsin.
                   1975.

             623.  U.S. Department of Commerce. "Energy Impact Complicates Coastal Manage-
                   ment Problem", Commerce America, pp. 4-6. October 11, 1976.

             624.  Environmental Protection Agency. "Steam Electric Power Generating Point
                   Source Category- Effluent Guidelines and Standards". Federal Register.
                   Title 40, Chapter 1, Subchapter N, Part 423. Volume 39, No. 196, Part III..
                   Tuesday, October 8, 1974.
             625.  Energ' Research and    Development Administration. Role of Transportation
                         y
                   in the  Nuclear Fuel   Cycle, report to the Michigan Environmental Review
                   Board at its July, 1976, meeting, Lansing, Michigan.

             626.  Environmental Protection Agency.       'Federal Register., Vol. 41, No. 81,
                   "Effluent Guidelines", Title 40, Chapter 1, Part 401/402. Monday,
                   April 26, 1976.

             627.  Environmental Protection Agency. "Thermal Discharges", Title 40,
                   Chapter 1, Part 122. Federal Register, Voluem 39, No. 196, Part II.
                   Tuesday, October 8, 1974.

             628.  U.S. Environmental Protection Agency. Development Document for Best
                   Technology Available for the Location, Design, Constructiong and
                   Cap city of Cooling Water Intake Structures for Minimizing Adverse
                   Environmental Impact. April, 1976.

             629.  Federal Register. "208 Planning Rules. Appendix C, 40 CFR Part 130
                   and 131: Policies and Procedures for Continuing Planning Process,
                   Preparation of Water Quality Management Plans.", Vol. 40, No 230.
                   Friday, November 28, 1975-@

             630.  Environmental Protection Agency. Coordination of Coastal Zone Management
                   Plans and.Air Quality,Implementation Plans. August, 1976.

             631.  U.S. 94th Congress. 2nd Session. Senate. Legislative History of the
                   Coastal Zone Management Act of 1972, as Amended in 1974 and 1976 with
                   a Section-by-Section Index. December 1976.
<pb n="539" />

                                                            524

                632.   U.S. Department of Commerce, National Oceanic and Atmospheric Administration,
                       ,"Notice of Final Rulemaki,ng, Coastal Zone Management Program Development
                       Grants": Federal Register, Vol. 38, No. 229, November 29, 1973.

                633.   U.S. Department of Commerce, National Oceanic and Atmospheric Administration,
                       "Notice of Final Rulemaking, Coastal Zone Management Program Administrative
                       Grants":.Federal Register, Vol. 40, No. 6, January 9, 1975.

                634.   U.S. Department of Commerce, National Oceanic and Atmospheric Administration,
                       "Proposed Regulations, Federal Consistency with Approved Coastal Zone
                       Management Programs": Federal Register, September 28, 1976.

                635.   U.S. Department of Commerce, National Oceanic and Atmospheric Administration,
                       "'Proposed Regulations for Financial Assistance to Coastal States, Coastal
                       Energy Impact Program": Federal Register, October 22, 1976.

                636.   U.S. Department of Commerce, National Oceanic and Atmospheric Administration,
                       "Program Development Grants, Coastal Zone Management": Federal Register,
                       December 6. 1976.
<pb n="540" />

                              I1@ " @S@
                          e@@ - @, @ @
                            \"
                        V@ . -

                                                                             3 6668 14109 1142
</text>
</doc>