[From the U.S. Government Printing Office, www.gpo.gov]
PUBL@CAT@ON OF-THE DOD OD HD 9502 U52 S159 1977 Rwm 14-M /V T Mam OF 7ECKNOLOGIV CAMOMME M,/gMCMLM'M M159 COASTAL ZONE INFORMATION CENTER PREDICTING THE LOCAL IMPACTS OF ENERGY DEVELOPMENT: A CRITICAL GUIDE TO FORECASTING METHODS AND MODELS Debra Sanderson Michael O'Hare Laboratory of Architecture and Planning Massachusetts Institute of Technology Cambridge, Massachusetts 02139 Property of CSC Library CZIC COLLECTION May 1977 PREPARED FOR THE UNITED STATES ENERGY RESEARCH AND DEVELOPMENT ADMINISTRATION Under Contract No. E(49-18)-2295 U.S. DEPARTMENT OF COMMERCE NOAA COASTAL SERVICES CENTER 2234 SOUTH HOBSON AVENUE CHARLESTON, SC 29405-2413 Rinds for this project provided by the Division of Biomedical and Environmental Research of the United States Energy Research and_Development Administration D. S. R. SMT Project Title: Environmental and Cormunity Donald Patterson Service Inrpacts of Staff Consultant Energy Facilities Susan Pbskowitz Administrative Assistant Project Director: Lawrence Suskind GRAIMME STUDENT -':!T=: Associate Professor of Urban Studies and Planning Susan Brody Alden Drake Robert Foster Project Staff: Catherine Lu Lynne Tionaco MCULTY: -Debra Stinson Michael O'Hare Associate Professor of Urban Studies and Planning National Governors' Conference Stanley A-West Energy Director: Assistant Professor of Edward Helminski Civil EIngineering The author of this paper takes sole responsibility for the material and points of view presented. Nothimg in this paper should be construed as an official policy statement of the National Governors' Conference or the United States Energy Research and Development Administration. Abstract Models forecasting second-order impacts from energy development vary in their methodology, output, assumptions, and quality. As a rough dichotomy, they either simulate community development over time or combine various submodels providing community 11snapshots" at selected points in time. Using one or more methods -- input/output models, gravity models, econometric. models, cohort-survival models, or coefficient models -- they estimate energy-development-stimulated employment, population, public and private service needs, and government revenues and expenditures at some future time (ranging from annual to Ifaverage year@' predictions) and for different governmental furisdittions (municipal, county, state, etc.). Underlying assumptions often conflict, reflecting their different sources -- historical data, comparative data, surveys, and judgments about future conditions. Model quality, measured by special features, tests, exportability and usefulness to policy-makers, reveals careful and thorough work in some cases and hurried operations with insufficient in-depth analysis in others. Acknowledgements Various researchers and staff members helped us acquire these studies; many constructively criticized the preliminary hypotheses and evaluation criteria. In particular, Edward Helminski was generous of his time in locating references and Donald Patterson functioned as a sounding board and contributed essential insights into the political and financial climate surrounding projection studies. Three Energy Impact Project staff members shared administrative tasks: Catherine Lu and Lynne Monaco located fore- casting models prepared in particular states; Robert Foster also discussed conceptual problems at length.. Several typists willingly and skillfully produced the several drafts of this paper. Despite all this help, remaining exrors are our own. Table of Contents Part I: Introduction Objectives ............................................. o .......... I-1 Coverage ........ o ............................................... 1-2 Introduction to Modeling ........................... o- .... o....-i-3 Vocabulary .................. oo .......................... 1-3 Types of Models ......................................... 1-8 Criteria for Review ....................... ..... 1-12 Format .......................................................... 1-15 Cautions for Consumers .......................................... 1-16 Part II: Projection Methods Employment ...................................................... II-1 Overview ................................................ II-1 Basic Employment ........................................ 11-3 Secondary Employment .................................... 11-4 Employment Multipliers: Constant Ratios ......... 11-4 Employment Multipliers: Regression Coefficients. 11-5- Input/Output Coefficients ....................... 11-5 Income Multipliers .............................. 11-6 Captial/Labor Ratios ............................ 11-7 Proportionate "Increase Factors .................. 11-7 Econometric Forecasting ......................... 11-7 Miscellaneous Approaches ........................ 11-8 Population ...................................................... 11-9 Overview ................................................ 11-9 Total Population and Subgroups .......................... 11-9 Employment Participation Ratios ................. 11-9 Cohort-Survival Models....@ ..................... II-10 Population Allocation: Gravity Models ........... II-10 Additional v. Total Population .................. II-11 Service Impacts ................................................. II-_12 Overview ................................................ 11-12. Housing ................................................. 11-14 Education Services ...................................... 11-16 Water and Sewerage ....................................... 11-17 Other Public Services .................................. 11-18 Retail Services ........................................ 11-20 Income ......................................... 11-20. Retail Service Levels .......................... 11-20 Public Revenues and Expenditures ............................... 11-22 Overview ................................................ 11-22 Revenues ............................................... 11-23 Property Tax ................................... 11-23. Sales Tax ...................................... 11-24 Income Taxes ................................... 11-24 Transfer Payments .............................. 11-24 Royalty Payments ............................... 11-25 Expenditures ........................................... 11-26 Revenue-Expenditure Comparisons ........................ 11-28 Part III: Projection Studies ........................................... III-I Additional Studies .............................................. 111-45 Part IV: References IV_, PART I: INTRODUCTION Objectives In the "boomtowns" of American legend and history, people sought to strike it rich" but gave little thought to the impacts of development on the community at large. Today, however, many westerners oppose energy development lest it reduce the quality of local public services and destroy their current lifestyles. To learn how this energy development will affect their communities -- immediately and in the long run -- many planners and public officials have turned to mathematical projections of the "second- order impacts" of development for a look at the future that will follow development. (First-order impacts, such as population increase, don't concern people as much as the resulting second-order impacts, like over- crowded schools caused by newly arrived families.) In the following pages we review the methods which have been used to predict the second-order impacts of energy development.* We begin with a general introduction to predictive mod-els'and their uses and then discuss the most common techniques used by the studies re- viewed. The last section -- not intended to be read straight through describes critically the salient features of each forecasting model. *"Prediction," "forecast," and "projection" all describe views of the future but connote different degrees of confidence that both the initial conditions and the outcomes will take place. We use the terms interchange- ably since we focus on the methods used in determining future conditions rather than on the reality or expectation of different models' initial conditions in different applications. 1-2 Coverage Although we intend to cover all reputable studies on this topic, this edition excludes some studies recently or not yet obtained. Section III lists these models for the reader's convenience. Where several publications report results from the same model, we have reviewed only the most thorough publications. Some models are not emphasized since Stenejhem's study [46], which we recommend, presents an excellent evaluation of them. 1-3 Introduction to Modeling Vocabulary The technical vocabulary of mathematical. models is not forbidding, bu t since some terms are often used carelessly and some have specialized mean- ings, this section will review the language model users are likely to en- counter. It is useful to consider a model as a simplified picture of the real world (Figure 1). In the real world, a variety of phenomena can be observed of which only a few can be measured or counted. Most model designers sim- plify the real world (for which decisions must be made) into a few measures which capture the important characteristics of the phenomenon under study as the value of certain numbers. For example, the phenomenon of education might be simplified into "number of students" and "number of full-time- equivalent teachers." Each of these becomes a variable in the model; the model is us ed to generate values for some of these variables. If the model is a good one, the values it generates are close to what the real world would show, The model generates values for its variables by mathematical. rules (functions, or equations) whose form describes the "kind" of relationships believed to obtain between the variables and whose coefficients and constants parameters -- describe the "amount" of this relationship assumed. For example, if we think that the number of teachers in a school system is a constant multiple of the number of students, we might construct the function T = A tpP (1) where* T is the number of teachers Atp is the parameter of the relationship P is the number of pupils 1-4 Phenomena (Wisdom . learning, books, budgets, people Variables Simplification - teachers number of teachers=T - pupils number of pupils=P Relationship Calibration Function Increase A =0.00251 __.w T=Atp P together" tp Other Number of Influences Pupils P Future Prediction Real number T of teachers Real World Model Figure 1 Model-World Correspondence 1-5 To use.this relationship, which i-s: constructed onithe basis of some theoretical or empirical knowledge that enables us to select it from among other candidates like T A1 + P (2) T P/A2 (3) T (P-325) 31 (4) we have to calibrate the model, choosing values for the parameters. This is usually done by running the model "backwards" with all variable values supplied (from existing real-world situations that are hoped to be similar to the new situation the model is supposed to predict) and observing the values of the parameters that result. For example, if we know of several cases like the following: Implied Case T P A tp 1 42 1603 .0262 11 632 25,200 .0251 111 10 430 .0233 Mean 228 9,077 .0249 we might set Atp equal to 0.0249. To use the model, we supply values for fe2xLo_Senous.variables the ones the model does not generate); in our little example, we would supply a student population, say 100. The model then generates a value for T as (2.49 x 10-2 ) 100 = 2.49. The model's prediction of teacher full-time equivalents is 2.49, which is precise to three significant'figures. Whether it is accurate or not depends of course on whether (1) is correct and whether we calibrated it correctly. It might also depend on less analytical con- siderations; if we know that teachers will be hired in full-time positions only, the number in real life can only be 2 or 3. Another way we might err is in the selection of our exogenous variable's value; this value, together with the form of the functions we select, is 1-6 one.of the assumptions, used in constructing and using the model, Assump- tions may be unsupported (judgmental) or may result from thorough theoreti- cal and empirical research. Often, they are tested., Two kinds of tests can be used. The first, sensitivity testing, attempts to determine whether the model's predictions change a s the assumptions change.. As a trivial example, we might run the model wi,th the parameter B taking on different values; since B does not appear in (1), the prediction of T is obviously insensitive to changes in B. (.It is obviously quite sensitive to changes in the assumed value of P!) If we were nervous about the estimate of B that we wanted to use, such a test would be reassuring that a bad guess for B wouldn't damage our predictions. The second kind of test includes all those experiments, like running the model from known data in a situation for which the outcomes are known, which.confirm. or. challenge its overall credibility. If we tested the model on pupil enrollment in West Gulch, 1972, and it predicted 2.42 teachers while West Gulch actually had sixteen, with no plans to fire any, we would doubt the validity of the model. One way models reflect changes in the economy is to trace the movement of dollars through their various rounds of spending. input/output models divide a region's economy into sectors according to their product and they show how one dollar put into production in one sector will affect the other parts of the region's economy. Assume a ton of coal output costs the mining sector $4 for each hour of labor it uses. Part of each dollar spent for the labor input will find its way to the manufacturing sector in exchange for clothes; the manufacturing sector in turn will spend part of that dollar in the industrial sector for plastic to make buttons, and so on. Each dollar spent by the mining sector will make its rounds through a variety of sectors, its final impact being some multiple -- I the interdependence coefficient -- of its original size. Multiplying an assumed business volume in the mining sector by that sector's interdependence coefficient will tell us the economy's gross business volume resulting from --Lhe-adning sectorts activities.- Another-way models predict fu t-ure conditions is.through multipliers, simple ratios which predict one variable in terms of another. Standards often relate costs or jobs to population through per capita ratios, such 1-7 as "county expenditures.per.person." or "doctors per 1000 people," but they may also be used to-represent simultaneous changes in variables (workers-per-family, persons-per-family, or populAtion-per-employee), Many models use adequacy standards''to represent the level of public and private services and facilities. "needed" by a population for suitable living conditions. Another type.of standard, also called a multiplier, involves a more com- -j@lex theoreticAl-ba-se. To developemployment multipliers, a model must divide the economy into two sectors:- the expIort sector includes al:l activities producing goods and services sold to buyers outside the region, while all remaining activities are a part of the local sector which produces goods and services consumed within the region., According to export-base theory, employment (including workers involved in local-sector activities), is a linear function of export employment (workers involved in export sector activities), the function being represented by an employment multiplier, the ratio of total to export employment. Assume ,a region has an employment multiplier of 2.5. If,export sector employment is expected to increase by 1000 because of a new electric generating plant, then total employment is predicted to increase by 2500 (1000 x 2.5 2500). 1-8 Types of_Models Prediction models, which aredeveloped and applied at a real cost in money and effort, are presumably worth using because they will improve the decisions planners and government face under conditions of uncertainty. A good model will fit the decision at hand @- whether by good fortunes if it is adopted from a previous use., or by design -- in three ways; (1) The variables predicted are those related to the problem at hand; if the decision a town faces involves planning school construction, the model chosen or designed should provide complete predictions of education- related variables, might usefully predict government revenues and total non- education obligations, but probably should not waste computer time and an analyst's labor on crime and water-resource projections. (2) The predictions will be made for a useful time or time series; some models generate results for a "typical year twenty years hence" while some generate annual values for twenty successive years. (3) The model should match the decision-making jurisdiction usefully. A town planning its school budget will probably obtain little help from a model which generates school enrollments for a six-county region. In addition to choosing a model which fits its application in subject, time, and scope, the user has to choose between two principal classes of models, simulations and coefficient models. While models in both classes simulate the real world and use coefficients in their equations, a simula- tion model (Figure 2) predicts community growth and change from present conditions while coefficients model (Figure 3) generates values for the dependent variables from selected assumptions about future conditions. A simulation model combines equations which define the relationships among the relevant variables and which transform conditions in one year into the conditions in the next year. Operating the model with the first year data yields the second year results and the second year results become the data for predicting conditions in the third year.* Thus the model generates successive sets of values for variables, one set for each future year, with each set depending on the values from the previous year. The important characteristic is the model's ability to portray changing conditions, year after year, without any adjustment of the equations themselves. *Some models proceed in steps of different sizes -- months, seasons) or decades have been used but years are typical. 1-9 Describe Design com unity dynamics model* trans- relationship between variables over late "rules" into time equations Year 1 conditions Operate Exoge - model nous data year I Year2 results Operate Exoge- model ..ous data year 2 Year 3 results etc.) Key- <> Model design decisions C-7 Model operation Model result (output) or data (input) Sequence of model use Flow of data or result Figure 2 @ Simulation model Simitlation models apply a set of relationships between (usually) a single year's variable values and their values for the next year. Once the model is designed , it is applied repeatedly , simulating the changes expected in the real world sometimes with annual data not generated by the model D eri be, isc >d com u nty ynImic 0 s 0 <relcti n h b two esn va riaIips0 b ever tim0 Design Design rule" ex- submodel X, Operate Exog- picining variable translate "rule" submodal enous datum X, year N Into standard X, Xb yearN X, f (X b X, 2AbI Xb Value of X, year N Design Design rule" ex- submodelX2 Exog- translate "rule" Operate ploining variable into standard --No submodel enous datum X2 , year N X2 = A X1 + X2 Xc,yeorN X2zf(X$,Xc) 2 9 1 A2C XC Value at X2 year N Design Design rule" ex- submodel X-3 Operate plaining variable translate "rule" --No submodel X3 year N into standard X3 X3 f (X2 X3@A32 X2 Value of Key: X3 year N <> Model design decisions = Model operation Model result (output)ordato (input) Sequence of model use Flow of date or result (etc.) Figure 3 Coefficient" model HCoefficient" models follow a sequence of loglcol dependence but not a temporal or causal sequence. They generate values of different varlobles in a single year, each depending on one or more of the values computed previously. The coef f icient model . does not directly simulate, changes over time but instead provides "snapshots" of conditions in selected years, An equation predicts the value of a dependent variable at one.point in time given a value of the initial, independent variable, Another equation relates this result to a third variable And predicts its value in turn, and so on., Instead of having one model which predicts values for all variables over time we have a collection of "submodels, ti each of which predicts a value for one variable at one point in time. These submodels might have to be redefined to make predictions for-a different year. The distinction can be caricatured by calling a simulation a "working model" of the real world while a coefficient model is a descrip- tion of the ways various aspects of the world "tend to change together." Most models are not clearly one type or another but fall somewhere on a continuum between these two extremes. For example, a coefficient model can be made to act like a simulation by assuming appropriate changes in the coefficients themselves over time, and by making projections for each year. The choice of a model's structure depends on the resources available to a policy-maker (for example, simulation models tend to be theoretically sophisticated and costly in computer time) and on the type of decisions he faces, since neither structure is inherently 11right" in every situation. 1-12 Criteria for Review Model output can be misleading in two basic.ways; (1) variables have the wrong values, or (2) values are given for the wrong variables, The second type of error can be detected by comparing the structure of the model to the. decision it is intended to aid, but the first type is usually more treacherous, since the likelihood of error is difficult to detect without assessing the model's correspondence to the real world. In Part II below we discuss possible or likely errors which can,result from the use of a model having either the wrong structure (usually causes type (1) error) or the wrong parameters (usually causes type (2) errors). A structural.error could stem from a variety of situations; some examples follow: important relationships ignored Projecting demand -,-for fire services from population estimates over- looks the important considerations of hou@�ing density, transporta- tion network, and building. type. same parameter used for two different phenomena One study uses a population growth rate to project both future population and future commercial activities, although the causes of their growth differ. dynamics ignored A constant public-expenditure-per-capita ratio ignores possible effects from changes in either tax rates or personal incomes, just as a constant income multiplier (.total income/export income) ignores significant structural changes within the economy over several decades. r lationship represented incorrectly Most studies represent educational expenditures as a multiple of the number of children, but one.adds changes resulting from economies of scale, children@s ages, and the taxing jurisdiction's assessed value. 1-13 Shortcuts designed to save time.and mQne7 or to account. for a lack of the "'right"' data can lead to wrong parameters,, as in the.following examples: regional parameters used to project subregionAl changes Input/Output coefficients developed for a.multi- county region become parameters for estimating changes in one particular county.. parameters estimated in the wrong decade Some models calculate parameters from 1960's business data to project 1970's business patterns, undersized sample used to calibrate parameters Estimating a future tax rate from the experience of only a few other cases may give little confidence -- in the statistical sense -- in the estimate. parameters.calibrated from biased or unrepresentative sample Estimating business activity of a large mining sector from a very small mining sector assumes the increasing size and relative importance of mining does not affect,; its relationships with other businesses@and risks error resulting from choice of an aberrant example of the industry as a whole. Many models offer advantages and virtues as well, but these are more difficult to categorize. Part II (arranged by topic) and Part III (arranged by model) highlight errors or virtues of interest to policymakers, focussing on (i) testing, (ii) general usefulness to policy-makers, and (iii) contribution to projection methodology. We are especially concerned with (iv) the model's respective exportabilities, but rather than measure these, we raise questions policy-makers should consider before applying each model to a particular situation. A conclusive evaluation on our part would require testing which most studies don't include; most important, since "exportability" depends on the match between the model's properties, the specific conditions in each community, and the particular policy-decisions faced there, it is not a generic property of the model taken alone, 1-14 Policy@makers can use the.que.stions we raise, their own common.sense, and their familiarity with their locale-to-de.,te.rmine a mode-V's applica-r, bility to their situation. The first three criteria listed above.result from some.of the important shortcomings we see in these.models as a group.. Without testing it is difficult to place much.confidence in the results, and without questioning a modeVs usefulness, we may end up with interesting answers to the wrong questions. In addition, we hope to encourage innovative approaches to modeling by pointing out special contributions to projection methodology, We can reduce many of these questions to one concern how much confidence can a policy-maker place in the results? The a nswers must reflect the type of decisions being faced, since some decisions require only accuracy while others also require precision. For example, expecting the school-age population to increase by "about 800" may be sufficient for deciding whether to build an additional school;.for this decision, the projected figure need not give the exact number of children, but it must be accurate (correct within its claimed range of error).. But another decision, such as deciding whether to build the school with 82 or 83 classrooms, requires an estimate with much greater precision. Projection models usually disclaim precision, being more concerned with accuracy. We find it unreasonable to expect much precision from these models and deplore the reporting of results with the appearance of one-part-per-thousand precision (i.e., "808 students"). 1-15 F cirma t Our analysis serves two types of needs: policy-makers depending on someone.else's projections can use the analysis to quickly understand the issues surrounding them, while analysts making their own projections can use it as a review of the forecasting literature and of some studies in progress. The study's format allows readers to avoid what is not important to them without missing anything. Each section in Part II focusses on one second-order impact (i.e., employment, population, public services) and includes both an overview and a detailed analysis of the projection methods which have been used. Readers with limited time or interest can, read selected overviews for a general understanding both of the approaches used and the problems encountered in projecting each p artic ular-imp- act..- Part III reviews eachstudy, as a whole, to help those "shopping" for a particular model. 1-16 Cautions for Consumers Those purchasing projection'studies should be aware that many studies have been low-budget projects, done very,quickly (in the interest of "timeliness"), lacking careful consideration and analysis of the problem at hand; few adequately reference their sources of information or repo rt any testing of their models. Defects like these reduce a study's useful- ness and hinder the development of better projection methods Lack of testing is less.serious when procedures are either explained or well-enough referenced to allow their replication elsewhere, but too many studies report numbers without explaining their derivation. Besides these weaknesses, we found several omissions common. Most studies ignore the price elasticity of demand for services and omit procedures for defining "need." Does the cost of providing services affect the quantity of service desired? Experience tells us that if tax bills increase -- especially, relative to income -- people decide they. don't want so many public services after all. If there is a relationship between service costs and demand, does it change from place to place or from genera- tion to generation? Most important, does everyone "need" the "average" service level? Do they "need" the level recommended by some professional group? How do we decide what people "need" in a particular rapidly growing community in the year 1990? These questions are neither trivial nor easily solved; purchasers of projection studies expecting to buy models which address these questions and which overcome the weaknesses prevalent elsewhere, should carefully consider the constraints they place on consultants. Projectling second-order impacts costs more time and money than many clients have allowed. Unreasonable constraints on time or funding discourage thorough analysis and reporting, and poor results may be as much the fault of these constraints as of careless work. PART II: PROJECTION METHODS Employment Overview Employment projections reflect export base theory-* by focussing on three typesof projection tools: emplo yme nt multipliers inc ome mul'ti- pliers, and input/output coefficients. An employment multiplierdirectly transforms predicted energy facility employment into additional total employment. Likewise, income multipliers are used to estimate additional total income which an employee/income ratio can convert into total employ- ment. Models built on input/output interdependence coefficients also in- clude a two-step process, forecasting additional business volume stimu- lated by energy development and applying employee/business volume ratios to estimate total employment. (Econometric models,, a fourth type, depend less on export-base theory and define employment as a multi-variate func- tion of several explanatory variables whose coefficients are estimated with regression equations. This approach overcomes many problems associ- ated with multipliers.) Three important assumptions form the basis for using these three multipliers: (i)'a constant and causal relationship over time between sector activities, (ii) small changes in worker productivity, and (iii) insignificant shifts in the export sector's structure. The most basic assumption, a constant fixed relationship between sectors, ignores the dynamics of the economy (although multipliers which change over time or *Export baae theory 4saumes-all econ45mic-activity in d region to be directed into two sectors: the export sector produces goods shipped out of the region; the local sector produces goods and services consumed within the region. The size of the local sector (also called secondary sector, non-basic sector, and derivative sector) is assumed to be a known function of the size of the export sector (also called basic sector and primary sector). **Export base employment is that'which produces goods.shipped out of the region. 11-2 with sector size may partially reflect either drastic economic changes (the energy facility itself) or slow responses to change). Models using multipliers implicitly assume small changes in worker productivity, which may be misleading in light of conflicting evidence concerning boomtown worker productivity. For example, if worker productivity actually de- creases, requiring more workers than anticipated to mine a ton of coal, then the assumed multipliers will underestimate total employment. In ad- dition, multipliers can't model drastic shifts in the export sector's structure, which may change the relationship between export and non-export sectors and thus render the multipliers incorrect. . To avoid such problems, decision-makers try to choose a source for the multiplier wisely. While some projections use a regional multiplier to estimate employment at a sub-regional level* others choose multipliers observed in regions with economic structures similar to the affected re- gion's future economy. A model may specify multipliers for an entire economy, for construction and operation workers separately, or for each sector of the economy, but Bender's work suggests that multipliers should be even more disaggregated. He discovered significant differences between multipliers for industries of different sizes and types, which challenge the use of univariate multipliers at all. The correct estimation of what is exported and imported depends both on the initial division of the economy into export and non-export activi- ties and on "leakage" variables. These last estimate dollars spent out- side the region, and their supporting assumptions should consider the region's size, its isolation from other major shopping areas, and its pro- duction requirements. Finally, the period of time covered may affect the model's reliabil- ity. Models commonly use multipliers estimated from mid-1960's data and applied to mid-1970's data, to project employment in 1990 or 2000. At some point policy makers must determine if the projection period is dif- ferent enough from the data source that the resulting error should be re- duced by judgmental "fudges,11 *Senechal and Bender warn against use of regional.multipliers for estimating at the sub-regional level. 11-3 Basic Employment Most models project employment from the estimated additional export employment. These figures, which energy companies or government agencies provide, usually become the foundation for all remaining projections- Models may use employment data for each year (2,,7, 12, 1, 20] or selec@ ted future years [5, 11, 15]. Two models [13, 24] use estimates of the required number of workers per unit of outputito transform projected energy output into export employment. [24] also uses company estimates of workers per year. Another [10] uses a multi-variable equation. [27a] presents basic employment estimates for each of eight types of energy development. The data permit users to predict basic employment resulting from a proposed operation. History shows that basic employment projections can err as commodity prices, energy demand, availability of labor, or weather cause work sche- dules to shift. For example, the Jim Bridger power plant experienced a construction workforce peak earlier than expected and at more than twice the projected level ([Z8], p. D-2), a phenomenon sometimes attributed to a shortage of skilled labor and a lower than expected worker productivity. Since further projections hinge on these estimates of additional basic employment, the error cascades through the analysis. 11-4 Secondary Employment Employment Multipliers: Constant Ratios There are several types of employment multipliers, the simplest being a ratio of total to basic employment calculated at one particular time [2, 7, 12, 14, 32, 20]. The Booz, Allen, Hamilton.model [2] lists."high", "medium", and "low" multipliers for several sizes of expor t sectors, but the vague and inconsistent instructions for choosing the appropriate multi- plier and the absence of references make them almost useless. The only explicit assumption holds unemployment constant. Other models [7, 14, 12, 20, 241-. use constant ratids but provide more explanations. one [7) uses responses to a business survey to divide each industry's sales between export and local and calculates an export/local sales ratio. With this ratio they divide employment into export and local sectors and calculate an employment multiplier (local/export employment). A Wyoming model [14] develops multipliers by using a "location quotient", equal to an industry's share of county employment divided by its share of total state employment, and defines export sector industries as those with quotients greater than one. Separating county industries into export and service sectors, the model calculates five employment multipliers (1930- 1970) per county which form a trend line used to estimate annual county multi- pliers for 1971-1983. Two studies share the simplest approach, taking available employment multipliers and adjusting them judgmentally to reflect regional differen- ces. For example, Luken [12] takes a regional multiplier (1966) and ad- justs it for Mercer County, North Dakota, considering the county's close- ness to an established trade center and its probable changes in future decades. Another model (20] employs multipliers calculated by other mo- dels Q131, [141) and adjusts them in consideration of tourism, the anti- cipated speed of energy development, and the different multiplier "strengths" of construction and operation employment. A similar approach [32] involves calculating multipliers for large, medium, and small cities and adjusting these multipliers by the portion of the basic-workers involved in facility construction. The Argonne model [27a] presents constant ratios as an appropriate prediction tool when users have poor input data. A time-lag model allows adjustment of the ratios, to more closely reflect actual employment growth patterns. 11-5 Employment Multipliers: Regression Coefficients. Regression analysis.is used frequently todevelQp multipliers sensi- tive to changes in.export sector size, The Kaiparowits study 1181 reports a thorough development of this procedure, using regression equations to measure the effects of (i) time, Cii) county size, (iii) construction phase, (iv) economic base changes, and Cv) proportion elderly on employ- ment multipliers. From the regression coefficients of these variables the study area's probable multipliers are inferred for the.present and future. Although Bender [34, 35] does not actually project employment, he analyzes differences in multipliers by region, industry type, industry size, and industry scale. From regression equations with independent variables reflecting these characteristics, he first predicts secondary employment and then calculates the resulting implied multipliers from each region's export industries. He discovers that multipliers vary by ty@e of industry, by region,-by distance from major trade centers-, and by scale,. especially within the Plains Region. For example, regional..multipli7ers range from .62 to 2.31 for mining and from 1.21 to 3.71 for - manufacturing; within a region, basic industries' multipliers can differ by a factor of 6. Multipliers also decrease as industry size increases. Using constant multipliers in situations where the size of the basic industry will increase dramatically tends to overestimate secondary employment; and in the absence of appropi- ate adjustments, their application "to energy development situations could be grossly misleading. (24, 25, 26, 271 apply Bender's methodology [341 when developing employment multipliers. The last also incorporates a time-lag model. Input/Output Coefficients The projections initiated by the. North Dakota State.University team 15, 11, llal use input/output interdependence coefficients developed by Sand [36] from 1965 data for the Dickenson, N.D. region, a part of the State Region 8, They project both normal and Onergy-induced future em- ployment, which they add to get projected total employment. Estimated final sectors' demand, multiplied by-sector interdependence coefficients, 11-6 yields gross business volume; multiplying this last estimate by extrapo- lated state business volume/total employment ratios determines total employment in Mercer County under current conditions. To calculate employment stimulated by energy development, the model allocates projected energy company expenditures to sectors and multiplies by coefficients to yield additional gross business volume. Multiplying this figure by extrapolated regional business volume/total employment ratios determines employment stimulated by energy development. While one study [5] explains this employment,multiplier procedure and separates construction-from operation-induced income and employment, the other (111 barely hints at the multipliers' derivations and completely ignores con- struction efforts. The former model projects levels in 1980, 1985 and 2000, but the latter makes projections for an "average year," which is less sensitive to errors but less meaningful for planners. However, a conference presentation of the model [11a] includes annual predictions and better explanations of the procedures. The application of these interdependence coefficients rests on shaky ground. Saud [363 developed the original 30-sector model using 1565 data; and Senechal [371J tested the second version, a collapsed twenty-one sector model, using 1958 to 1968 data for the state and eleven regions. The current version, a thirteen-sector model (reduced according to Senechal's recommendations) uses current data to project gross busi- ness volume to the year 2000 [5, 11]. Senechal found the coefficients overestimated changes in a region experiencing a sudden and dramatic in- crease in oil and gas activity. Thus his tests support use of the coef- ficients under normal circumstances but suggest the coefficients may over- estimate business volume under drastic changes in an industry size. ,Research and Planning Consultants adapt the Texas 1/0 model to offshore oil development [231. Income_Multiplier Polzin [15] uses regression analysis on 1960-1972 data to project an income multiplier for a three- and a seven-county region, choosing the income multiplier rather than the employment multiplier as being better 11-7 able to model changes in the economic structure, From projected new export earnings he calculates additional "derivative" earnings, which he multiplies by an earning/derivative worker ratio to yield additional secondary employment from new energy development. He calculates construc- tion and operation income separately, using a construction multiplier half the value of the operation multiplier, and reduces incomes to reflect decreases in farm income. Capital/Labor Ratio The BOOM1 model [8] is alone in calculating secondary employment, by applying constant labor/capital ratios to the projected capital invest- ment to determine.the number of jobs. It also separates projections into public service and non-public service jobs. Proportionate "Increase Factors" A study used in an Environmental Impact Statement [19] projects secondary workers associated with a proposed coal-gasification facility through population and income "increase factors", which have no apparent theoretical base. Employment in certain sectors of the economy is as- sumed to change at the same rate as either population or income; employ- ment in other sectors, assumed to reflect changes in both population and income, is considered to reflect an average rate.' These estimates in- clude only first and second rounds of spending whereas other multipliers reflect all rounds of spending. Separate projections are made for con- struction and operation periods. Econometric Forecasting Krutilla's version of Curtis Harris' model [10] uses regression equations to project the annual total employment change as a function of the change in output, the new level of output, and the capital investment. The model uses very disaggregated data: 99 industrial sectors, 4 govern- mental sectors, 69 equipment purchasing (investment) sectors, and 28 types of construction. By avoiding simple employment multipliers and by de- pending on these variables his model probably reflects well the.actual decision-making processes determining employment levels in an area. 11-8 Miscellaneous Approache Several other studies calculate secondary employment but their procedures are obscured in available material. One study [13] uses computer simulation, including a cohort survival model, to determine employment/ population ratios. Another study [11 applies Ullman's "minimum require- ment method" to develop county multipliers for both military and civilian populations, adjusting multipliers according to past experiences in other regions. 11-9 Population Overview Most models view population as a function of employment, which they define with various demographic variables reflecting family size, employ- ment patterns, unemployment, and migration. The basic projection proce- dure uses one or more ratiop -- population per worker, employees per household, population per household -- to predict population, but it of- ten omits important variables which could increase the model's accuracy. Specifying population per worker (i.e., the employment participation rate) should take into account the possibility of multiple-worker house- holds, the inmigrants' lifestyles, and the demographic changes accompany- ing a boom. An important variable, the percentage of jobs filled locally, should also be considered and may vary with the type of development, its location, or its social environment; the percentage ranges, in different models, from 0% to 68% for operation employees and up to 100% for service employees. A related and important variable considers the development's impact on unemployment, which models represent as either a constant level of unemployment, a constant rate of unemployment, or (implicitly) zero unemployment. Total Popdlation and Sub@roups Employment Participation Ratio' The most straightforward tool for converting employment into popu- lation is the employment participation ratio, the ratio of total popula- tion to total employees. Three models [20, 33., 111 adjust established employment participation ratios for local population differences (al- though explanations of their procedures are not always clear), and a fourth study (5] uses historic data in regression analysis to project future ratios. Another [1] (considering the labor force rather than employment projects the labor force size from historic and comparative data; from these data they determine labor force participation rates, used to estimate population. A similar procedure involves two ratios, an employment/household ratio and a population/household ratio [2, 7, 12,, 32, 24, 25, 27a] [2] and-[i2l use a constant-statewi e average household size to project total population. -rhe-first -study us-es--an average employees/household ratio for II-10 operational employees and assume one worker per family for construction and service employees. The second model [121 uses an employees/household ratio, based on similar,areas outisde the study region. [7] and [32] apply different ratios ofemployees/household for each kind of worker. All four assume these ratios remain constant over time. In comparison with other data sources, especially the Construction Worker Profile, [7]'s ratios appear question- able: average family size exceeds that in several other studies by mo re than one person. Cohort-Survival Models I Several studies (18, 15, 10, 14, 26, 27a, 30] employ cohort-survival models to project total population be age/sex groups, using separate parameters for construction and non-construction workers and defining migration as the population influx required to fill excess jobs. The Kaiparowits study [18], basing projections on experiences in the Navajo Project in Page, Arizona, calculates population under two extreme assumptions about service industries' response to energy development. One model [15] increases worker produc- tivity according to national trends, and decreases annual farm receipts by $30 per mined acre. Krutilla's model 110], using four age groups and two race categories, projects population from a regression equation with birth, death, migration, wage and labor-surplus variables. The use of the age/sex labor force participation ratios in these cohort-survival models has an advantage over other types of models by allowing population and labor force to change at different rates; Polzin's results show labor force increasing faster than population, reflecting an increasingly young population and multiple job holders per family. A weakness in the approach stems from its definition of migration as a function only of the difference in total labor supply and demand, which may ignore mismatches between labor force skills and employment needs. Population Allocation: Gravity Models Besides projecting total regional population, several studies allo- cate population to particular local governments through the use of a gravity model [19, 2, 12, 1, 11, 20, 26, 27b]. These models generally assume population increases are related directly to city size and inversely to city distance from point o f employment. The first model [19] uses a ratio of city populations, weighted by distance from the facility, to- distribute construction and operation employees. Two others [2, 12], using the Booz, Allen and Hamilton gravity model, include variables for distance, city size, and importance of work-related trips, and allocate workers to a single city within the "community."' A Wyoming model [20], considering only city sizes and distances, can distribute migrants to more than one city within the region, and Arthur D. Little's gravity model [11 allocates population under three different policy assumptions. A North Dakota model [11] distributes population among school districts according to each school district's current size. Other models [24, 32] combine several of these approaches. (32] allocates workers according to commuting distances, alternative residences, physical barriers, and gov- ernment and company location policies. [24, 25, 26, 27b].use an econo@ metric submodel to predict spatial distribution from (i) assumed housing preferences, (ii) commuting preferences, and (iii) community services -- all constrained by income and housing availability. Additional versus Total Population Studies differ according to the completeness of their impact consi- derations. Studies considering only inmigrating population resulting from a major energy facility do not present a picture of the total popu- in a future period [18, 15, 20]. Another method adds new employ- ment to previous employment and projects total population from total employment, which allows for possible changes in the original population [1, 101. The Argonne models _[24, 25, 26, 271 combine baseline and inmigrating population estimates to determine-the total-ne-w'-population. The baseline estimates reflect the changes in employment opportunities. 11-12 Service Impacts Overview The majority of models predilct service demands by multiplying population estimates by per capita "adequacy" standards like "hospital beds per 1000 population" or "policemen per person." The models' different sources of standards -- those recommended by professionals; the study area's observed status quo; or those observed in areas similar to the study area's anticipated condition -- reflect different definitions of "adequate"; but the studies present little evidence to support one definition over the others. Projecting future service levels from these standards risks inaccuracy, since variation in population behavior and attitudes threaten the validity of the standards'@underlying assumptions. "Adequacy standards" supposedly measure the "need" for certain services, but social custom, the price elasticity of demand, and regional differences can render any of these standards invalid. For example, if tax rates increase will public service demand decrease in response? As incomes increase, do demand levels change? Can "need",act as a proxy for effective demand? Most studies fail to address this kind of question; while some mention it as a problem, none seriously addresses the problem of defining "need" or confidently suggests ways to handle it. Three often overlooked variables -- current service utilization, residential settlement patterns, and population age distribution -- may have significant impacts on predicted demands for services and infra- structure. Failure to consider current service and facility utilization may result in an over-estimation of the future needs. The settlement pattern, including housing density and mix of housing types (i.e., multi- family, single-family, or mobile homes) influences the demand for public infrastructure such as schools, roads, sewage lines, and fire stations; *In this critique, as in the model:7 reviewed, the term "demand" does not refer to the demand function but to.the quantity or level of services actually provided. All models reviewed either fail to consider any shift in the demand/price functions or (implicitly) assume totally inelastic demand. IT-13 and the population's age distribution strongly affects the demand for housing and educational services. Even the models using these three variables display little consistency in either their design of functions or their specification of parameters. At one extreme, cohort-survival models use the most detailed approach and divide the total population into many age categories which change over time by specified rules; at the other extreme, some models simply assume a percentage of the population to be school age, their choices differing by as much as ten percentage points. 11-14 Housin& Most models estimate additional housing demand from (i) number of households, (ii) an assumed distribution among single-family, multi-family and mobile home units, and (iii) separate calculations for construction and non-construction workers [2, 7, 11, 12, 18, 321. Leholm et. al. [111 simply assume that additional housing units produced within the region 'will equal the number of new families, which stops short of any serious policy questions since it implicitly assumes no one commutes, no one brings his home, and no homes are currently available. Four models (32, 19, 8, 7] include more detail, determining separate housing utilization rates and housing demands for each type of family. A similar but more detailed procedure [181 determines the number of households by applying an adults/ household head ratio to the adult-aged population cohorts, which can reflect changes in population age structure over time. The model also adjusts for the local service sectors' response time. Two models [2,12) use a statewide housing vacancy rate and current percentages of housing types to project future demand from non-construction workers, assuming permanent housing supply for construction workers shows a six-mont h lag but never exceeds the eventual demand by non-construction employees; mobile homes meet an "excess demand" by construction workers. Luken [121 applies the housing type proportions reported in [2] to urban areas and assumes 70% of rural housing will be permanent. Three models [2,18,1] show more sensitivity to the permanent housing demand factors. In the first two models the lag in housing supply in-, creases with the community's perception of the development's lack of lfpermanence." In the initial development phases, the community (both previous and new residents) will doubt its permanence and will be reluc- tant either to expand services and businesses or to invest in a permanent home. As it becomes more evident that the development is long-termed, businesses will expand and new employees will seek more permanent housing. The third model [11, with the most useful housing demand analysis, calcu- lates the number of households (from a population per household ratio) and develops housing budgets which they compare with the expected housing supply costs. From this comparison they determine (i) the necessary price 11-15 distribution of housing supply, (ii) the num ber-.-,-df families which can afford only to rent, and (iii) the portion of families unable to afford housing without assistance. 11-16 Education Services Increased demand for educational facilities is an immediate problem for most local governments experiencing rapid energy development. While there may be delay in needs for other public services, public schools experience pressure for expansion as soon as new employees relocate their families. Predicting educational demand requires (i) projected school- age populations; (ii) pupil teacher ratios; (iii) pupils-per-classrbom ratios; (iv) square feet per child or per classroom ratios and (v) pupils per school. Several studies employ very straightforward procedures (2,12,1,11,19, 33.1. Using average state percentages (held constant over time) they estimate elementary and secondary school enrollments from projected pop- ulation, and new teachers and classrooms are estimated as a function of student increments (ranging from 17 to 30 students per teacher). Three models [21,7,2] alter these procedures for construction workers, using different estimates of the number of school-age children per family. Studies'with a cohort-survivalmodel [9 and'15-]- 'add popula:tion:in the appropriate age ca-tegories to determine the number of child ren in each grade level, (15] applies per pupil ratios to estimate-numbers 01 classrooms and teachers. A unique approach [10] estimates the yearly school-age populations in both primary and secondary grades from simple population ratios. Service expansion is assumed to take place when one year's school pop- ulation exceeds the previous pea in school populat'ion, thus cleverly incorporating a measure of facility capacity. 11-17 Water and Sewerage [18, 2, 91 project demand for water and sewerage services from either average of maximum per capita measures, while others [1, 9, 211 base estimates for water distribution systems on water consumption and housing density assumptions. Models [9] and [18] determine sewerage needs from water needs. (1] spatially distributes housing units which water/sewer engineers use to lay out water and sewer lines; their designs reflect constraints from topography, population settlements, infrastructure, and density. [231 and [281 pay special attention to water demand as a limiting or critical factor in development. Other Public Services Otherpublic services and facilities,__,such__as police-and fire protec- tion, tend to be estimated on a per capita bases. One approach [4] applies well-known per capita standards to projected construction and non-construction populations to estimate both facility and service demands, taking care not to use per capita standards where they may be misleading. For example, without either a physical plan or detaile d demographic data, it may be misleading to project staffing levels for mental health, welfare, fire, roads and streets, public transportation, and recreation, since population size does not alone determine use of these services. The authors display adequacy and cost standards which might be applied and stress use of these standards as only beginning points, assuming that final projects will include analysis of, and discussions with the local populationi Three models [9, 12, 33] use per capita service standards either recommended by the state or computed for. areas similar to the future energy development area. [9] uses simple per capita coefficients for some services but adjusts them for others, i.e., fire and police protection, libraries and health service, where demand is not a simple function of population. For example, required water flow (for fire fighting), town layout, and population determine the fire demand coefficients. The model calculates service demands only for the year of peak population. In the second study these standards measure current capacity and "excess demand" for various government services under three alternative development scenarios; the third just measures additional demand, assuming that half the employees live in the primary area. A more involved study (18] adjusts average levels of police, fire and general employees per capita in prototype U.S. cities for regional differen- ces, various growth expectations, and inflation to predict demand in 1986. The B00141 model [8] pfojects -public service facility demand from estimated population levels and from a measure of public service facility shortages, with the latter reflecting differences between estimated and 11-19 constant (standard) ratios of public service capital per capita. Argonne models-[26 27b].use adequacy standards, develop ed for them. by Real Estate Research Corporation, which quantify "average acceptable standards" for each of ten services and 24 community types. Standards are expressed first as service needs per unit of population, students, or dwelling units and eventually are converted into.per capita esti mates. Retail Service Income Most models represent demand for private services as a function@of personal income and population size, basing income projections on . I increased wages and salaries of new employees. The simplest approach-[21 multiplies the number of basic and secondary workers by mean basic and secondary earnings, respectively, summing to get total new income. A more refined procedure [7] employs the number of new employees and earn- ings in each sector of the economy to calculate each sector's new earn- ings, applying 1972 income levels adjusted for 4%.annual inflation and assuming no sector loses income or employees. The Kaiparowits study (181 includes even more detail, assuming worker productivity increases over time, inflation rates differ for construction and non-construction worker earnings, and that.salaries differ significantly by job type. A simulation model [15] defines secondary worker per capita earnings as a positive linear function of migration, and projects total new income with an income multiplier. Another model [12] also using an income multiplier, chooses a regional multiplier to project county income, which we consider a ques- tionable practice. The BOOM1 model [8] uses projected wage rates and numbers of workers in various sectors of the economy to calculate permanent personal income; it considers temporary personal income separately. Retail Service Levels Projections of retailing generally represent sales as a portion of personal income and retail space as proportionate to sales. In predicting retail sales volume from personal income, models often use a percentage of personal income -- 50% to 60% -- spent on retail goods [7,12] and may adjust these percentages for retail "leakage" [8,21. (321 adjusts 1970 -and 1975-retail sales per capita-figures for specific local conditions and for high, medium, and 1ow d evel opment scenar ios (criteria for adjust- ments not specified). [31] defines retail sales per capita as a function 0.f median family income, percenturban popula-tion,_-and county "recreation po- --- te- --A approac retail sector's ntial." -different h [11,-lla-]-CalculateS- the Sales -volume . by.a-pp-ly-ing in@e-rdep--ende-n-c-e-c-oefficien@s-to energy company-- 11-21 investments. Generally a retail space/retail sales ratio converts these estimated sales into space requirements; but one model (18] uses several ratios to calculate space requirements,by type of retail good, and another [2] offers predicted values for wholesale sales, using whole- sale/retail ratio. The Arthur D. Little study (1] includes variables for both population and city size when predicting retail service demand, but it uses different parameter values for "convenience" and "shopping" goods: the sizes of both convenience and shopping outlets are functions of population, but the number and location of outlets differ by population concentration, with the "commercial" outlets dispersed evenly throughout an area and the 11shopping" outlets located in large population centers. This approach ignores the commonly assumed retail services' demand factors, but without testing we cannot conclude whether population or income standards are more accurate; a combination of both standards may be the most appropriate approach. BOOM1 [81 combines several techniques: from projected total personal income it estimates retail expenditures, which it multiplies by a capital investment/retail expenditures ratio to yield the "required" retail and service facility investment. "Additional" retail and service construction is the difference between the current and the "required" facility investment. IIr22 Public Revenues and Expenditures Overview The projections of most interest to policy makers, politicians and taxpayers concern expected government costs and revenues. Regrettably, these estimates usually deserve little confidence since they are often the final figure in a cascade of forecasts offered without significance levels or confidence intervals. The most common reliability test deter- mines the outcomes of several different hypothetical development or settlement patterns, but surely calculations would be more valuable to policy makers with some measure of each case's range or variance. Confidence in these calculations can only come from careful analysis of the assumptions used. Revenue projections, depending on assumptions about changes in tax rates, in assessment rates, and in the tax base, are seldom "exportable" since these vary with the political and social climate of each area. Projections of government expenditure usually employ a constant cost standard, such as cost/pupil or cost/square foot, but some models incorporate assumptions about (i) inflation rates, (ii) productivity changes, and (iii) changes in unit costs for such items as fuel and land. An important aspect of both revenue and cost forecasts is the jurisdictional level of projections. Those made for a state or multi- county region yield average estimates but hide the fiscal management problems faced by particular local government officials, while projections specifying lower levels of government point out not only the size of the revenue pie but also the distributional problems. Unfortunately, the poor quality of available data seriously reduces both the accuracy of local level projections and their ability to foreshadow numerous serious impact problems. 11-23 Revenues Property Tax A number of studies forecast tax revenue from current tax rates but, differ in their estimation of taxable property value [2, 12, 32, 33, 19, 1]. The first four models use current assessment ratios and.let market value equal construction costs (the third uses 80% of construction costs). Another [191 defines permanent home market values as a linear function of mobile home values. [1] projects taxable value from historical trends. A second approach [18, 7, 15, 10, 19, 32] forecasts the tax base from per unit estimates of property's taxable or market value: value/mile of rail, value/unit of production, equipment value/employee, construction costs/ square feet, costs/acre, property value/person, etc. The Kaiparowits study [18] uses such ratios but adjusts their values for a 1.7% annual inflation rate. A North Dakota model [11] displays a third approach, defining-taxable values as percentages of investment, using a different percentage for each type of property. Few models adjust taxes'for response time lags, except those which project impacts just for the facility operating phase [18]. One multi- state study [41 omits explanations of tax base projections but discusses each state's policy. The discussion focusses on causes of tax revenue lags and includes an example of annual education revenues and expenditures. The BOOM1 model [8] reflects some time lags in tax revenue estimations by including the value of commercial capital, which changes over time, in its market value calculations. While most models build revenue projections on current tax rates, some estimate future tax rates from past trends [18,11,151. Another approach [81 holds the assessment ratio constant and adjusts tax rates to yield required revenue, i.e., debt payments, operating cos 'ts, and 40% of new construction costs. Krutilla's model [10] uses several tax rates to test the results' sensitivity*to this parameter. [31I.avoids tax rates entirely, defining property tax revenue as a function of total personal income. 11-24 Sales Tax- Sales tax revenue projections, follow procedures similar to property tax revenue predictions -- multiplying a tax rate by the projected base, sales value [19, 31, 32]. One method [181 employs limited sensitivity .testing both by using three sales volume assumptions and by varying tax rate and base combinations. An input/output model [11,.-.1l.a] forecasts both recurring and non-recurring sales tax revenues by applying tax rates to estimated gross business volume in appropriate business sectors. Non- recurring revenues result from new construction: applying the taxable sectors' inter-dependence coefficients to 22% of business volume (the portion representing non-recurring new construction) yields the dollar change (tax base) subject to current tax rates. Income Taxes Those models including income taxes simply apply constant tax rates [15, 11] or estimated future tax rates [18] to projected income levels. A different approach [101 averages income taxes paid in each income category, allocates workers to these categories, and adds these estimates to yield income tax revenues. Transfer Payments Several models include state subsidies to local government. [101 measures state transfers of coal development revenue. Using the 1973 transfer payment fraction of local government revenue, [8] assumes about half of local revenue will come from this subsidy. [9] and [13] use per capita estimates for measuring transfer payments; the former also predicts revenue sharing funds from a complex submodel simulating Tennessee's revenue sharing process.. 11-25 Royalties and Severance Taxes Minerals on @state property are extracted under leases; the lessee pays the state a roylaty set at a fraction of production value or at a fixed sum per ton. Minerals extracted on federal property involve similar royalty payments to the federal government, of which the state receives a fixed share. Mining on private and public land is often subject to a severance tax, also specified either as a fraction of value or as an amount per unit. One study [181 projects royalties from lease terms and estimate d tonnage; severance tax proceeds are predicted as an assumed price per ton multiplied by the tax rate, an amount of revenue per ton, or a multi- variate equation (18, 15]. 11-26 Expenditures Projecting government expenditures almost always depends on costs per capita or costs per service unit. Simple, aggregated projection procedures are often used for operating expenditures, multiplying average expenditures per person by the number of persons [14, 15, 2;@ 18, 31, 32, 21, 71. (311 defines per capita expenditure as a function of total personal income in a county and a "growth in service factort"' which. was not explained explicitly. Its estimation of education expenditures reflects the local share of the costs, a one-year tine lag and local taxable property value. [24] develops a more complex ratio which reflects the indivisibility of some services and the nature of public consumption. More thorough models also consider current service capacity [2, 12, 7, 32). Two of these [2, 12] define construction phase public expenditures as 90% of the level expected during operation and others [9, 111 use per capita cost controlled for city size. Some studies [7, 9, 32, 12, 11, 19, 10, 21] project at least a portion of expenditures from estimated service levels rather than just expenditures per capita figures. One t-echnique divides services into several levels before calculating costs (e.g., parks -- neighborhood, community and regional; water and sewer -- local, areawide), defining different unit cost parameters, both operating and capital, for each service level [1, 30]. For example, in [1], local water and sewerage costs are projected from infrastructure needs determined by model output and engineer's infrastructure designs.. Costs estimates include considerations of current infrastructure, financial source, timing of financing, residential density, and local distribution of families. The BOOMI model [8] uses per capita measures for capital and operat- ing costs (taken from (32]) to predict public facility construction, debt, and operating expenditures. Another model [3] uses a similar approach which reflects construction costs and unit operating-costs. A simulation model [101 estimates per capita revenue and uses it as a proxy for non-education expenditures, assuming tax rates are defined as a function of (i) population, (ii) population density, (iii) personal income per capita, (iv) taxable property value and (v) area. 11-27 Only a few models (1, 9, 10, 181 consider, even in a limited way, the effects of inflation and changing price-elasticity on public expen- ditures. We think forecasts should seriously consider effects from demand changes and should test the models' sensitivity to different per capita demand measures. 11-28 PubIlic Revenue/Expenditure Comparisons Several studies take expenditure and revenue projection one step further by comparing total expenditures and revenues., Their authors- recommend caution when using these comparisons, since their uncertain assumptions and poor quality of data make them a risky basis for dec-id- ing on a development's long run value. Polzin suggests readers use his estimates as nothing more than "ballpark" figures, and we suggest similar caution with other projections -- unless they involve improved methods and more testing. The simplest fiscal impact models compare projected total revenues and expenditures for various levels of government at several points in time [2,-?11, 12,.15, 39i 31'-@_321. - One model [11] compares only the change in revenues and costs for an "average" year, ignoring impacts already expereinced in the construction phase. [32] compares expenditures and revenues in only the expected peak years (for each,of,threedevelopment scenarios). Another model [15] projects only 1980 and 1985 county and state fiscal impacts using OBERS projections [44] as part of the base- line figures (i.e., without energy development); expenditures reflect all operating costs. Luken [12] estimates separate operation and construction effects for the state, county and various cities in the mid-1980's. One cost/revenue comparison [2] looks at different levels of government, adjusting capital investments for interest costs, and calculates present values. The local impact model by Bruckner and McKay [31 employs constraints for municipal expenses and income: expenses in any one year are less than or equal to income in that year' and the revenue structure and capacity determine expenditures. BOOM1 [8] uses a great variety of variables to depict the municipal finance impacts, including public construction, bonding, assessed valuations, operating costs and tax rates. Planned testing of these models (currently in development stages) will allow better evaluation of their validity,.but currently available reports allow their examination. PART III: PROJECTION STUDIES Arranged by projection study, this section summarizes the distinguishing characteristics of each model. It.@@addresses- five types of questions fox each study: Design Purpose -- Why was the projection model developed? Special Features -- What sets this model apart from the others? What are it s special contributions to projection methodology?' Tests -- What testing, if any, do we find that,establishes confidence in the model's application and results? Exportability -- How successfully can this model be applied to a different setting or development situation? What questions should be answered before a new user can apply the model? Usefulness -- How can this model serve the policy-makers' needs? What questions might it address? How easily can it be r eplicated and what costs (time, skills, dollars, etc.) are involved? The descriptions should be used in conjunction with Figure 4 which tabulates the variables, the geographic-levels, the projection time periods, the development phases, and the various submodels found in each document. 111-2 [1] Arthur D. Little, Inc. Analysis of Selected Lhpacts of Trident-Related Population Growth in Kitsap County., Seattle: Central Puget-Soun.d Economic Development District, December 1975. [1a] Horsley, John C. Isaki, Paul S.; Jensen, Kenneth A. The Trident Sub-, marine Comes to Kitsap County: An Analysis of Secondary Community Impacts. A paper delivered at the Tenth Annual Pacific Northwest Regional Economic Conference, Victoria, British Columbia, May 7, 1976. Seattle: Central Puget Sound Economic Development District, 1976. Design Purpose Estimates effects of construction and operation of U.S. Navy's Trident Submarine Support Facility in Kitsap County, Washington. Special Features Housing demand projections consider "affordability" and reveal the portion of families unable to afford housing without public support. Use of computer mapping subjects housing and public infrastructure development to topographical and social constraints; public infrastructure costs reflect both unit costs and borrowing costs. Also thoroughly considers differences in two populations, civilian and military, and estimates all results for four residential density patterns. Tests Changes assumptions concerning residential density and settlement patterns and compares results to projections from current trends. Another test compares employment projections to a special census. Exportability Particularly suitable to other situations owing to considerations of (i) local effects, (ii) changes in small time periods, (iii) different populations (military and civilian), and (iv) natural and man-madedevelopment con- straints. While actual quantitative values for assumptions may differ else- where, precedures for reaching assumptions and variables considered are exportable. 111-3 Usefulness Documents and explains assumptions and procedures and indicates thorough and careful work. Despite limited testing, the projection procedures appear useful for policy-makers. Output format is ideal for testing effects of alternative local and county policies on costs, timing of financing, and supply of revenue; and the reasoning behind assumptions and procedures increases confidence in the output. Using the model requires extensive computer-mapping and statistical skills, but data requirements are not complex. The entire projection procedure, as presented in this document, could not be replicated without technical staff accustomed to computer-mapping and economic projections. [1a] provides easily understood overview of problem and model's approach. 111-4 [2] Booz, Allen, and Hamilton, Inc. A Procedures Manual. Billings, Montana: Old West Regional Commission, 1974, Design Purpose Intends to standardize impact study techniques by developing projection methods applicable in any situation. Special Features Work-book format proceeds from a description of input data needed to variety of formulae, output of one becoming input for another. In view of application problems that have arisen, planners at Old West Regional Com- mission (OWRC) do not recommend its use by those unfamiliar with projection methodology. Client has no plans to correct manual's shortcomings for less sophisticated users. Tests Produces "answers" to questions but contains no documentation to support validity in application. Two other documents (Evaluation of the Procedures Manual, @,pplication of the Procedure Manual) summarize application to Wheat Land, Wyoming in 1975, and suggest possible revisions. Exportability OWRC has no plans to revise the Manual and lately has come to question this approach to the problem of evaluating impacts as too general. Usefulness Excludes several important elements: estimations of tax rates and per capita standards over time; changes in per capita demand levels over time; inflation; and effects on pre-facility population. Contains dangerous typographical errors, and inconsistencies in the input data's dates and geographic bases. @hssumption of locating coal facility in fastest growing school district limits the Manualls application. We trust it principally as a framework for more detailed analysis, and hold it entirely insufficient for develop- ing impact projections for decision-making. 111-5 [3] Bruckner, Lawrence. A. and McKay, Michael D. A Local Impact Model. Los Alamos Scientific Lab Report LA-6665-MS. Los Alamos, New Mexico: Los Alamos Scientific Laboratory, January 1977. Design Purpose Estimates impacts to determine construction time-tables that p'erm it orderly community growth. Special Features Linear programming model, to optimize construction timetable variable. Defines "employment multipliers" as the "units" of one industry needed to support "units" of another. Constraints and objective functions can be varied by user. Tests Sensitivity analysis for arbitrary values of parameters and objectives presented. Exportability Cannot be determined; designed.for general applicability. Usefulness Objective function in inconsistent units; parameters for a real application must be determined. Linear programming format probably over- simplifies the real phenomenon portrayed. Variables highly aggregated. 111-6 [4] [Anonymous]. Anticipated Effects .of Major Coal Development on' Public Services, Costs and Revenues in'Six Selected Counties. Bureau of Reclamation, Billings, Montana and the Center for Interdisciplinary Studies, Montana State University, Bozeman, Montana, 1974. Design Purpose Demonstrates possible impacts in six non-adjacent counties (in three states) and their major cities from three levels of energy development. Special Features Emphasizes limitations of national and regional standards and recommends them as a guide in determining impacts, distinguishing actual needs from needs estimated from average data. Recognizes that certain service needs are not linear functions of population, and that for other service projec- tions we lack comparable historical data. For these cases, addresses impacts which could influence costs, calling attention to variables important in planning. Projections cover three coal development scenarios defined by Northern Great Plains Resources Program. Tests None reported. Exportability Explicit projection techniques may be exportable since they depend on well-documented national and regional per capita standards. Service demands not direct functions of population, such as fire, mental health, or welfare services, discussed and accompanied by "adequacyl' standards and cost stan- dards. Usefulness Although most projection procedures cannot be replicated, the excellent documentation of service "adequacy standards" could benefit policy-makers. Projecting service needs requires minimal skills and time, given population projections. Choice of projection points (1980, 1985, 2000) limits policy- 111-7 makers focussing on immediate service demands, despite separation of cons'truc- tion and operation activity. 111-8 [51 Dalsted, Norman M.L.; Leistritz, F. Larry; Hertsgaard, Thor A.,; Frasse, Ronald G.; Anderson, Richard. Economic Impact -of Alter- native Energy Development Patterns in North Dakota. Prepared for Northern Great Plains Resources Program, June, 1974. Design Purpose Evaluate Western North Dakota's local economic, employment, and population growth impacts from NGPRP coal development scenarios. Special Features Uses of input output coefficients to determine total population, explain- ing in detail the process of allocating development expenditures to sectors of the economy; predicts impacts for.three development scenarios defined by Northern Great Plains Resources Program (NGPRP). Tests Senechal [37] tests the model at the regional level (not at the county level) and implies it is inappropriate for drastic changes in the mining sector. Further tests compare 1958-1973 input/output estimates to Depart- ment of Commerce personal income records, but the study reports no signif- icance tests. Regression analyses not explained in detail; while the assumptions seem plausible, we have no measure of their validity. Exportability Dependence on detailed regional input/output coefficients limits model application to 'regional impact studies (Sand [36] warns agains't their usia in subregional areas). Usefulness Given reliable interdependence coefficients, can be replicated by anyone familiar with regression analysis, but some aspects reduce its usefulness. Choices of average years and of regional study area limit application to 111-9 general analyses of secondary impacts, and problems may arise from the choice of different bases for calculating baseline.and impact parameters. Using input/output coefficients-ignores major structural changes"in factors of production. Assumes additional population is a function of additional bus- iness volume, overlooking changes either in proportion of workers lo.Sj@l hired or in unemployment. III-10 [6) Development Research Associates; Gruen Associates. Housing and Com- munity Services for Coal Gasification Complexes Proposed on the Navajo Reservation. "Chapter III.,, Framington, New Mexico: El.Paso Natural Gas Company and Western Gasification Company, 1974. Avail- able from El Paso Energy Resrouces Campany',__Frimington. Design Purpose Overall st udy design unknown; chapter uses economic system model to characterize hypothetical new town serving coal gasification project. Special Features The model differentiates impacts on two ethnic group,@, Navajo and Non- Navajo, and presents useful explanation of procedure. Tests The portion of the model at our disposal reports no testing. Exportability "Chapter III" explains, in great detail, derivation of assu mptions but not particular projection methods; exportability questions require familiar- ity with the entire model. Usefulness Approach to a very difficult and politically sensitive problem -- dif- ferentiating impacts on two ethnic groups -- should be useful to policy- makers facing similar situations. [7] Doran, Richard K.; Duff, Mary L.; Gilmore, John S. Sbci-o-Economic Impacts Proposed Burlington Northern and Chicago North Western,Rail,.Line in CamphelI40nverse' C_ o-,unties,_Wyomin .-Denver, Colo rado: D.env e.r iesea_rch@ Institute 1974. May Design Purpose Meet Bureau of Land Management's need for socio-economic impact analysis of proposed railroad; background for an Environmental Impact Statement. Special Features Surveys provide data for deriving employment multipli@rs. Tests Comparative tests find population projections similar to results in other studies, but testing of individual assumptions is absent. Exportability Demographic assumptions should be tested before application elsewhere. Usefulness One could replicate calculation procedures but not derivation of crucial assumptions; operating requires only minimal skills although surveying energy companies (for employment multiplier data) could be both costly and time- consuming. 111-12 [81 Ford, Andrew. Summary Des.d.ription..of the BOOM1 Model. LA-6424-MS, September 1976; User's-Guide to the BOOMI.-M-o-d-el. LA-6396-MS, August 1976, Los Alamos, New Mexico: Los Alamos Scientific Laboratory. Design Purpose General model for testing various public policies' impacts on boomtowns, such as loan guarantees and front-end capital-grants Special Features Systems Dynamics model [38,19], omits detailed service expenditures, concentrates only on variables determining ove rall. costs -- bonding rates and capacities, average life of public capital, public construction cost increases, etc. Documents' clarity and completeness exemplify excellent reporting procedures, allowing someone completely unfamiliar with the pro- cess to understand the model thoroughly. Tests User's Guide displays sensitivity tests of five important assumptions; the model is undergoing field tests, some assumptions claimed to be 11generic" (applicable to any town in any state) may be specific to locations or type of energy facility; field tests should resol@e.such questions. Exportability Several assumptions may affect exportability. User's Guide references the parameters chosen; several differ from those used elsewhere. Example: BOOM1 assumes labor force participation rate remains c onstant whereas [181 shows a significant change in this rate. Many parampters reflect the Rock Springs experience, especially the Gilmore/Duff "vicious cycle"'- poor living conditions, worker turnover, decreased worker productivity, increased public finance problems, etc. Other researchers challenge Gilmore/Duff hypothesis on the grounds that (i) their analysis is superficial, (ii) it incorrectly assumes causation among variables with high correlation, and (iii) it ignores Rock Springs' atypical social history. Unfortunately, tests of parameters will 111-13 not callattention.to possible weaknesses of this type. Can easily remove present dependence on Gilmore/Duff vicious cycle. Usefulness Although not ready for application, an innovative approach to predictions of local impacts. Specifically addresses effects on local governments, including serious consideration of construction period; while it does-not specify particular service needs (i.e., number of doctors), it can analyze basic policy questions. Both Summary Description and User's Guide document assumptions and procedures well enough to be understood by patient laymen. Although data requirements are no more extensive than in other studies, model implementation requires both computer skills and the ability to tailor it to a particular locality. BOOM1 has been successfully replicated by other research teams. 111-14 19] Intermountain planners and Wirthm-Berger Associates.- Capital Facilities Study; Powder River Basin,. Cheyenne; Wyoming Department of Eco- nomic Planning and Development, 1974'. Received from Cumin Asso- ciates, Billings, Montana. Design Purpose Develop methods and information to help county officials plan for mineral developm ent in the Powder River Basin. Special Features Predictions for public facility and service'demands and costs reflect current capacity, utliization and future Usage rather than only population. School expenditures function of school district size, predominant grade level, and district wealth. Predicted fire service demand based on fire flow and town layout. Tests No testing reported. Exportability Appears exportable but per capita coefficients questionable outside Powder River Basin. Predicting fiscal impacts with iterative reassess- ment process should be highly exportable. Usefulness Simple and inexpensive approach; appropriate for staff with limited technical skills. Provides indicators of possible service delivery and finance problems. Explicitness permits easy replication, given expected population and production data. Dependence on historical per capita standards may reduce.accuracy where substantial population changes expected. II1_I5 [10] Krutilla, John V. and Fisher, Anthony C., with.Rice, Richard-E. Regional Economic and Fiscal .Impacts-of Energy Resource Development: A Case Study of Northern Great Plaits Coal. Washington, D.C.-: Resources for the Future, Inc., 1976. Design Purpose Reveal short-run problems accompanying shifts in energy supply by measuring economic, demographic, and fiscal impacts of Western coal development strategies. Special Features Recursive econometric model; overcomes several common shortcomings in other models: it M captures .dynamic changesi (ii) avoids dependence on development company estimates,of.employment, (iii) addresses policy problems through sensitivity tests, Uv) concentrates on accuracy rather than pre- cision, and (v) measures impacts on per capita rates and tax rates from changes in income level and in other variables. Tests Authors report extensive sensitivity and significance tests (lending confidence to the results), and explain calibration of parameters, direc- tion of possible errors (i.e., over- or under-estimates), limitations of results. Exportability While values of parameters may vary from situatio n to situation, struc- ture and procedures represent development impacts elsewhere. Omits detailed projections, such as service cost and projected service levels, which reduce exportability of other models. Usefulness Assuming availability of a staff at ease with econometric models, could 111-16 icated easily from included references and explanations (only a-few be repl simple parameters are inadequately referenced-) . Possible drawbacks are avoidance of detailed cost estimates and brief consideration of municipal impacts; implied criterion throughout is preference for accuracy over pre- cision. 111-17 [11] Leholmi Arlen G.; Leistritz, F. Larry; Hertsgaard, Thor A. Local ITpacts of Energy Resources:Development in the Northern Great Plains Region. Denver Colorado: Northern Great Plains Resources Program, September 1974.:[See also-lla@4ndadditional studi6s.III- Design Purpose Aid state and local decision-makers by analyzing Mercer County , North Dakota socio-economic impacts from various coal development strategies. Special Features Uses input/output interdependence coefficients and projected gross bu iness volumes to predict impacts from two (of three) N.G.P.R.P. development scenarios; apparently extends [5] but includes fewer references and expla- nations. Tests Testing limited to projections using different residential settlement patterns. While per capita measures specified for city size and overall robustness help minimize errors, application of regional interdependence coefficients to single county economy make all results questionable. Exportability Dependence on input/output interdependence coefficents and absence of references reduces exportability especially to areas smaller than a multi- county region. Usefulness Results may be helpful when deciding general policy questions but have little value for more specific questions. Predictions reflect a county's "average annual" impacts during the operation period, and cannot address either local or construction-period impact problems. (Claims to consider only operation phase, but projects revenues resulting from facility con- struction.) Discusses current capacity of public services and facilities, but omits these considerations from predictions. Basic structure, excluding estimationof coefficients and ratios, could be replicated from this study's explanation. However, study shows little sensitivity to probable errors.. Without further testing we place little confidence in results. 111-19 [11a] Leholm, Arlen G.; Leistritz, F. Larry;".Hertsgaard, Thor A. Fiscal Impact of a New Industry in a Rural Area: A Coal Gasification Plant in Western North Dakota. Paper for presentation at the Seventh Annual Meeting, Mid-Continent Section, Regional Science Associa tion, Duluth, Minnesota, June 13-14, 1975. Fargo, North Dakota: Department of Agricultural Economics, North Dakota State University, 1975. Design Pur20se Explains [11] and includes some improvements. pecial Features Later version of (11]; makes annual predictions for both construction and operation phases, overcoming some shortcomings of the earlier study. Tests Reports no testing. Exportability Same exportability problems as (111. Usefulness Changes mentioned above, plus additional explanations and references, increase usefulness; using both studies together [11,11a], could be replicated, if one has access to or can determine input/output interde- pendence coefficients. Substantial recent improvements implemented through North Dakota's Regional Environmental Assessment Program (REAP). See Additional Studies 111-45. JII-20 [121 Luken, Ralph A. Economic and Social Impacts of Coal Devel opment in the 1970's for Mercer County, Nortb-Dakota. Prepared by Thomas E.- Carroll Associates. Denver: Old West Regional Conmis.s ion, 1-974. Design Purpose Provide prototype analysis of coal development economic impacts using [2]'s format and assumptions; emphasize public sector changes. Special Features Focusses on local governmentsand considers impacts during construction period. Tests .Includes sensitivity tests of residential settlement parameters and validity tests of gravity model (without adjusting the latter for errors); many assumptions come -- untested -- from [2], a model of questionable quality and validity. Exportability Increases exportability by making adjustments for inadequate historical data, but several assumptions may be inappropriate elsewhere. Example: pro- jecting government expenditures during construction phase assumes no addition- al capital costs and lower than average operation costs per capita; particular state and local policies, fiscal bases and expenditure patterns could render these assumptions grossly inaccurate. Usefulness Framework for analysis, lending itself to policy questions, considers each levelof governfnent and tests alternative settlement patterns which could be affected by government al control; but cost/revenue comparison for mid-1980 rather than for each year overlooks initial govern- 111-21, ment fiscal problems. Detailed reporting of projection methods, data sources, and procedures for deriving assumptions facilitates replication elsewhere. 111-.22 [131 Matson, Roger A. and Studer, Jeanette B. Energy Resources Development in Wyoming's Powder River.Basin:.An Assessment-of Potential Social and Economic Impacts. Prepared by the Wyoming Water Resources Research Institute. Denver: Northern Great Plains Resources Program, May.1974.--,-,,- Design Purpose Provide other NGPRP analysts with population projections (Powder River Basin) under NGPRP development scenarios. Special Features Includes ex post facto analysis of other projection studies; Wyoming Water Resources Research Institute currently employs two versions of this model to address impact problems. Tests A sensitivity test projects Sheridan County migration with four differ- ent migration rates; other parameters receive only limited explanation or support. Exportability Judging exportability requires (i) clearer -exposition of model than in documents cited and (ii) parameter testing in other counties. Detailed employment forecasts and cohort-survival model may increase exportability while specific model characteristics may interfere with its application elsewhere. Usefulness Excellent analysis of several other projection studies but otherwise of limited value for policymakers; were we better able to understand the model it might appear more useful. Estimates of county-level impacts for years during the operation phase, plus combination of export and local construction activities, exclude application to many policy problems. 111-23 Procedures cannot be.replicated from explanations presented; two support- ing documents [40,411 explain methods further, but sill lack detail to allow replication. 111-24 [14] Maxwell, Lynn C. and Neesham, Kenneth. A Model for County Popul ation Projections. Laramie, Wyoming: Divi sion of Business and Economic Research, University of Wyoming, June 1973. Prepared for the Wyoming Department of Economic Planning and Development. Design Purpose General model for predicting county population over time in Wyoming. Special Features Excellent explanations of development and application of location quo- tients and cohort-survival models. Tests Parameter estimation procedures well explained and referenced and regression analyses include significance levels, but application in a boomtown situation should be preceded with further testing. Appears no worse than other models developed from a "business as usual" period. Exportability Not designed specifically for boomtown changes; may be inappropriate for predicting energy development impacts. Usefulness Replication no problem as study includes both parameters and computer program; should be excellent for projecting baseline (i.e., without energy development) employment and population. Cannot easily distinguish differ- ences in construction and operation phases; we hesitate to recommend its use in rapid-growth settings. 111-25 [15] Polzin, Paul E. Water Use and Coal Development in Eastern Montana. Bozeman, Montana: Montana University Joint'Water'Resources Research Center, 59715, November 1974. Design Purpose Quantify socio-economic consequences of Eastern Montana coal development. Special Features Consideration of reduced agricultural production: cohort-survival model captures some labor force and population dynamics. Tests Questionable and important parameters subjected to either sensitivity or significance testing; and the two most important standards, income multi- pliers and labor force participation rates, appear valid. Exportability Robust, respects data limitations, and avoids complicated detail. Measure of agricultural impacts must be adjusted for local weather condi- tions or types of energy development. Usefulness Displays acute awareness of limitations; stresses its application to determine a rough idea of coal development impacts and not to decide impor- tant coal development questions. By predicting impacts at multi-county levels in 1980 and 1985, and by considering only county and state finances, yields only a general picture of effects. Included references and expla- nations permit replication elsewhere (at multi-county or state levels) by someone familiar with regression analysis and computer programming. 111-26 [161 (Anonymous]. Effect of Coal Development in the Northern Great Plains: A Review of Major:.I@,sues and Consequences-of Different Rates of Development. Denver, Colorado: Northern Grea t Plains Resources,Program 1975. Design Purpose Summarizes Northern Great Plains Resource Program (NGPRP) work group reports and includes some additonal predictions. Special Features Discusses and projects first-order effects on agriculture. Tests None reported. Exportability Projection procedures neither explained nor referenced; exportability indeterminate. Usefulness Includes limited explanations of parameters defining future services' operating costs, and most predictions reflect three NGPRP coal development profiles. 111-27 [171--.-.University of Denver Research Institute. Factors Influencing an Area's Ability to Absorb A Large-Scale Commercial Coal-Processin Complex, A Case Study of the Fort Union Lignite Region. Washing- ton, D. C.-: Energy Research and Development Administration, Fossil Fuels, 1975. Available from National Technical Information Service, Report # FE-1526-2. Design Purpose Predict consequences of very large Coal-Oil-Gas complex for rural and relatively urban areas in the Fort Union (N. Dakota, Montana, S. Dakota) region. Special Features Superimposes effects of large COG complex on predicted coal-based development in both an urbanized and a rural part of the study area. Emphasizes problems of rapid development and opportunities to control them. Tests Models based on seven case studies o f energy development; no testing reported. Exportability Specific equations and operation of model not provided. Parameters adjusted for study area and presumably not exportable as used. Usefulness Publication reviewed does not provide enough technical information to implement this model elsewhere. Extensive modification required if used in different context. 111-28 [18] Wistisen, Martin J. and Nelson, Glen T. Kaiparowits Socio-Ec onomic Study. Provo, Utah: Center for Business and Economic Research at Brigham Young University, 1973. Prepared for Bechtel Power Corporation. Design Purpose Part of Bechtel Power Corporation's Environmental Impact Statement for proposed development. Special Features IThorough comparative analysis, used in estimating parameters, recognizes data limitations and becomes a tool for using and improving imperfect his- toric data. Assumptions tested with theoretical and empirical questioning, seeking any spurious relationships or conditions which might make projections inappropriate. Tests Examines experiences in other settings (now or in the future) and analyzes selected variables through detailed review and regression analysis search for omitted variables. Exportability Actual assumptions may represent only the Kaiparowits study area but procedures for reaching assumptions should be highly exportable. Usefulness While annual projections:facilitate planning for immediate effects, size of study region (Kane and Garfield Counties, Utah, and Page, Arizona) pre- cludes specifying effects on particular local areas. Excludes facility's impacts on current population; does not project total population, total demand on schools, etc. Cohort-survival model reflects changes in labor force participation but could under-represent the level of in-migration. Clearly explains and references projection techniques and assumptions, but cohort-survival model and regression analyses require some computer skills. 111-29 [191 Woodward-Clyde Consultants. Environmental Impact Report, North Dakota Gasification Project. Bismarck,- North Dakota:.:ANG Coal". Gasif ication Company, 1975. Design Purpose Part of Environmental Impact Statement for a coal gasification project. Special Features Pro ections of secondary employme t involves an inexpensive but question- i ar- able procedure and reporting format and model structure appear to serve the client's particular interests. Tests Testing absent, as are references and explanations of important assump- tions. E@portability Vagueness and deviation from parameters used in other models limit ex- portability. Many assumptions, reflecting either national standards or the Safeguard Project's experiences, appear questionable. Examples: defines a single family home market value as three times mobile home value; expects construction and operation workers to have the same impact on secondary employment. We recommend careful analysis and testing of this model's parameters before applying it. Usefulness Limited use for policy-makers since represents total financial impacts over an entire period, failing to adjust for,present value and ignoring short-term financial difficulties. Projecting secondary workers ignores induced changes and lacks theoretical base. Avoids problems of construction period over-capitalization, assuming those public improvements will be just sufficient for operation period. Despite simple projection procedures, poor referencing makes replication both difficult and unattractive. IT-I-30 [201 [Anonymous] Coal and Uranium Development of the Powder River Basin -- An IMpact Analysis. Cheyenne: Wyoming Department of Economic -Plann ing and Development, 1974. Desi2! Purpose Sponsors seek model yielding accurate results requiring simple and in- expensive updating procedures. Special Features Despite simplicity, addresses most policy questions with general but accurate prediction. Tests Claims testing unnecessary since data problems require robust and simple model yielding only "ranges of impacts"; predictions appear accurate but lack supporting evidence. Exportability Because of generality and simplicity, appears equally applicable to other regions and situations; incorporates few assumptions, and doesn't seem peculiar to the Powder River Basin. Users may want to determine if simplicity and generality reduce exportability to significantly different situations. Usefulness Annual projections for three geographic levels, development alternatives and types of employment allow policy-makers to address a substantial range of problems. Projection methods and data survey techniques explained clearly and completely; could be replicated easily. Use of aggregate employment and population multipliers questionable, but may be adequate for "quick and dirty" projections. 111-31 (211 THK Associates, Inc. Impact Analysis and Development Patterns for The Oil Shale Region: Mesa, Garfield and Rio Blanco Counties, Colorado. Denver: Colorado West Area Council of Governments and The Oil Shale Regional Planning Commission, February 1974. Design Purpose Provide information facilitating planning decisions which mitigate adverse impacts from oil shale development. Special Features Housing predictions reflect family's permanence in region. Tests Predicts changes for three population settlement patterns; other tests not reported. Exportability Coefficients reflect U.S. average service levels; determining exportability requires more references. Usefulness Provides overview of total impacts but hinders application to local policy questions; poor referencing precludes replication; national adequacy standards do not reflect community preferences. AM 111-32 (221 Carlson, John F.; Doll, G. Fred.; Phillips, Clynn, Lofgren, Joyce; and Brock, James W. The North Platte River Basin Economic Simula- tion Model, A Technical Report and Supplement. Laramie: Water Resources Research Institute, University of Wyoming, 1976. Design Purpose Predict behavior of economy of eight-county region in Wyoming under- going energy development. Special Features Simulation model adapted from TVA-Battelle Regional Economic Simulation Model. Little treatment of government sector. Tests Parameters established by regression analysis of region-specific historical data. No significance tests. Exportability Most parameters must be established for region where applied. Not appropriate for very small region. Usefulness Inferences about government activity, service demand, and revenues must be derived from model's description of private sector behavior and population. Model simulates neither government sector changes (except as total government employment) nor effect of public service shortfalls on economy. 111-33 [23] Research and Planning Consultants. Offshore Oil: -Its Impact on Texas Communities. Austin, Texas: Texas General Land Office, February 1977. Design Purpose Predict effects of outer continental shelf (OCS) oil and gas development on Texas communities. Special Features Three independent development scenarios postulated. Combines input- output and multiplier models for impact prediction. Includes environmental and social impact predictions. Tests None. Exportability Depends on a modified version of the Texas Input/Output Model. Applicable in large (multistate) regions if 1/0 model is available but probably not useful for a single state application and would in any case require extensive "customizing." Much of.this study is specific to offshore oil exploration. Usefulness Useful to communities included in application area and to state government. Little detail in predictions, except in primary development requirements. Extensive environmental and social impact discussion. 111-34 [24] Baldwin, Thomas E.; Dixon-Davis, Diana; Stenehjem, Erik J.; and- Wolsko, Thomas D. A Socioeconomic Assessment of Energy Develop-- ment in a Small Rural County: Coal Gasification in Mercer County, North Dakota, Volume I. Argonne, Illinois: Argonne National Laboratory, August 1976. Design Purpose Develop understanding of local impacts from large scale energy development; facilitate analysis of alternative policy responses to problems. Special Features Predicting service demand reflects indivisibility of certain public services and nature of public consumption. Attitudinal survey used to define service needs and develop appropriate adequacy standards. Precursor to [25, 26, 271. Tests None reported. Exportability Analytical framework appears exportable; results of attitudinal survey particular to locality. Usefulness Not replicable from this document; Volume II, "Methodology", might permit replication. 111-35 125] Baldwin, Thomas E.; Dixon-Davis, Diana@4, Metzger, James E;-And -Stehehjem, Erik J. A Framework for Detailed Site-Specific -Studies of Local Soci6economic*Impacts from Energy Devel6pment. Energy and Environmental Systems Division. Argonne, Illinois: Argonne National Laboratory, December 1976. Design Purpose Provide methodology for assessing site-specific impacts of energy development and mitigation strategies. Special Features Employment multiplier developed using central place theory and economic base theory (recommended by [341). Consider local unem- ployment, commuting preferences, and locally available labor force when predicting inmigrant em2loyees. Population settlement patterns function of housing preferences, commuting distances, community servicest income, and housing availability. Attitudinal surve permits prediction of change in definition of public service needs and adequacy. Tests None reported. Exportability Model appears highly exportable; assessment analysis would probably differ among region s and communities. Usefulness Incorporates local attitudes defining public service adequacy, which precludes errors involved with national and regional adequacy standards. Explanations too brief to permit detailed replication. Produces-accurate data sufficient for many policy decisions. 111-36 [261 Stenehjem, Erik J.; Baldwin, Thomas E.@; Metzg.er,..James E.; and Dixon-Davis Diana. A'Framework for:CompatAtive*Ahaly6is of Socioeconomic Impact: CAse-I. Argonne, Illinois: Argonne National Laboratory, December 1976. Design Purpose Permit easy evaluation of local socioeconomic changes caused by energy development. Special Features Allocates county population to localities through econometric spatial model -- maximizes commuting, housing preferences; controls Yor income and housing availability. Less sophisticated gravity_model included. Projects public service requirements from service specific multipliers; .vary by type and size of community. Three computerized modules permit extensive user interaction. Application of [27]. Tests None reported. Exportability Multipliers, employment and public services coefficients designed to permit exportability; user should carefully assess their derivation (not available here) to`detei@mine actual, exportability. Usefulness Given reliable multipliers, methodology reflects actual inmigrant decision-making process without reducing flexibility or accuracy. Replica- tion requires further documentation; explanations sufficient to determine value to particular decision-makers, 111-37 [27a] Stenehjem, Erik J..,,. andMetzger, James t..:-A Framework-for Proj6ctin 2 n Employment and Population Changes:Acd6mpanying Energy Develo me t: Phase I.. Argonne, Illinois: Argonne National Laboratory, August 1976. [27b] - Phase II. October 1976. Design Purpose Provide government officials with procedures for predicting local economic and population changes (Phase I) and impacts on local public services and facilities (Phase II) resulting from a variety of proposed energy developments. S2ecial Features. Presents data for predicting basic employment,for eight types of energydevelopment. Time-lag model adjusts employment multipliers. Explains and specifies several spatial allocation models; develops public service standards reflecting demoaraphic and other special conditions. Stresses accuracy rather than precision thro ugh presentation of methods;, demonstrates them through step-by-step explanation of their application. Tests No tests reported; compares results from various prediction methods explained in the document. Exportability Disaggregated derivation of employment multipliers and service stan- dards; documents various methods fo-r-predicting the same data and discusses their appropriateness under different conditions., Exportability major objective of model. 111-38 Usefulness Written in layman's language, covering strengths@ weaknessesil and appropriateness of each methodology. Includes coefficients for predict- ing changes. Examples of methodology application demonstrate calculation process; model application requires little technical training. 111-39 [28) Freudenthal, David D.; Ricciardelli, Peter; York, Michael N. Coal Development Alternatives; An Assessment of Water Use and Economic Implications.- Cheyenne: Wyoming Department of Economic Planning and Development, 1974. Design Purpose Compare consequences of alternative means of exploiting Wyoming coal, especially with regard to water demand. Special Features Differs substantially from typical predictive models: describes employment, assessed valuation, population and coal use (or water demand) for unit quantities of water consumption (or coal production) for several different coal conversion options. Oriented to comparison of opportunity costs of state energy policy alternatives: e.g., "How many more jobs would be provided if 10,000 acre-feet of water were devoted to coal con- version option A rather than B." Tests None reported. Exportability Applicable to similar policy decisions in other semi-arid states or regions. Usefulness Informative and well-suited to its purpose but not a predictive model easily used by a community facing a specific development alternative, except for rough estimation of a few variables. 111-40 [291 [Anonymous]. The Anticipated impact of Colstrip Generators #3 and #4 2 on, Public Services, Housing and Commercial Services in CO-lstrip- Forsyth. Bozeman: Center for Interdisciplinary Studies, Montana State University, July 1974. Design Purpose Predictions of effect of generating plant construction for state and local government planning. Special Features Highly discursive; little analytic methodology. Tests None. Exportability Projections are based on interviews and "soft" data. Special regional characteristics not likely to be similar in new applications limit exporta- bility; methodology not explicitly presented. Usefulness Detailed discussion of several sectors of local public and private economy, but no discussion of fiscal effects. Provides better insight into the nature of rapid development problems than into their dimensions. 111-41 [30] Leholm, Arlen G.; Dalsted, Norman L.; Toman, Norman E.; Leistritzi F. Larry; Hertsgaard, Thor A.; Coon, Randal C. Economic Impacts of. Construction and Operation of Coyote Station #1 Electrical Genera- tion Plant and Expansion of Coal Handling Facilities at the Beulah Mine of Knife River Coal Company. Prepared for Sterns-Roger, Inc., Denver.. Fargo, North Dakota: Department of Agricultural Economics, North Dakota btate University, May 1976. Design Purpose Predict social and economic consequences,, especially for state and local government, of a 440 14W power generating station in Mercer County, North Dakota. Special Features Extenstive baseline data presented. Highly disaggregated treatment of public services. Tests None reported. Exportability Depends on good baseline projections for new application, and state input/output coefficients for new--application. Requires detailed but practicable modification for a new application. Usefulness Inconvenient for comparison of alternative policies. Very detailed projections for specific sources of revenue and public expenditure. 111-42 [311. Schuller, C. Richard and Hiltunen, Ronald A. A Generalized.Public Budget Analysis. 'ONRL./RUS-22. Oak Ridge, Tennessee: Oak Ridge National Laboratory, Regional Environmental Systems Analysis Program, September 1976. Design Purpose Create working model predicting local fiscal impacts of a develop- ment or a management strategy. Special Features Develops coefficients from 15 years historical data.. Builds on output from ORNL/RUS-25. Defines per capita property taxes as a function of total personal incomeand per capita sales tax revenue as a function of median family income,'percent urbanpopulation, and county "recreation potential." Service expenditures estimated from historical county per capita expenditures; general expenditures are a function of total _p@ersonal income and service growth factor. Tests Tests some estimated coefficients for fit with historical county data; sensitivity tests not reported. Exportability Formulae for calculating transfer payments specific to region, but basic concepts appear exportable. Methods for estimating coefficients depend on correlations, not causal relationships, which may not hold true elsewhere. Usefulness Dependence on historical data may reduce usefulness in energy develop- ment localities. Given population and income forecasts and coefficients, projection methods easily replicated by those with.minimal-computer skills. Some calculations of input data confusing, but overall methodology simple. 111-43 1321 Bickert, Browne, Coddington and Associates Inc. "Estimates of Public Sector Financial-Need�,, Six Western Colorado Communities." Nolume II of Boom-Town Financing Study_. Denver: The Boom Town Financing Study, ColoradoiDepartment of Local Affairs, Office of, Rural Development, July 1976. Design Purpose Estimate economic and fiscal impacts of fossil fuel development on six Colorado Communities. Special Features Predicts public finance impacts for peak years only., Compares coeffic- ients and results.with other projections for same counties. Tests Implied testing involves comparison with other projections. Exporta ility Methodology simpl e and exportable but coefficients peculiar to localities and to specific types of facilities and developments. Dependence on adjusted historical per capita data reduces exportability. Usefulness General methodology is explicit, but particular estimation assumptions are not specific enough for replication. Consideration of only peak years limits policy-making usefulness to very aggregate decisions and precludes overall understanding of thedevelopments' impacts. III-44 [33] Ryan, J.J. and Welles, J.C. Regional Economic Impacts of a U.S. Oil Shale Industry, No. 1: Public Policy Studies of a U. S. Oil Shale Industry. Denver: Denver Research Institute, University ot Denver, 1966. Design Purpose Indicate regional second-order impacts from oil shale development in Colorado. Special Features Employment multipliers adjust over time; assume increasing produc- tivity among operation workers; predict impacts for four levels of industry development. Tests None reported. Exportability Standards reflect recommended service levels, applicable for Colorado communities; exportability of other coefficients questionable. Usefulness Provide overview of possible regional impacts of energy development; some assumptions appear dated; sources of assumptions not explicit. 111-45 Additional Studies Additional studies excluded from this critique are listed belowfor the reader's convienience. Either'these were received too late to analyze or detailed methodology sections have not yet been received. For several, methodology volumes are irL.press. [47] Leistritz F. Larry and Murdock, Steven H. Research Methodology Applicable to Community Adjustments to Public Land Use Alternatives. Fargo, North Dakota: Department of Agricultural Economics, Department of Sociology, North Dakota State University, March 1977. -Describes most recent version of REAP's Economic-Demographic model and application to local land-use problems. Displays much improvement over earlier versions reviewed here [5, 11, lla, 30]. Two REAP documents supply even more thorough explanations: [48] Hertsgaard, Thor A.; Murdock, Steven H.; Henry, Mark; and Ludtke, Richard. The REAP Economic-Demographic Model: Technical Description. Bismarck: North Dakota Regional Environmental Assessment Program, 1977. [49] North Dakota Regional Environmental Assessment Program. The REAP Economic Demographic Model 1: User Manual. Bismarck: North Dakota REAP, State Capitol, December 1976. REAP, funded mostly from state appropriations, uses model to provide r1client" localities with predictions of changes expected from extensive energy development. [501 Resource Planning Associates, Inc. Identification and Analysis of Mid-Atlantic Onshore OCS Impacts. Dover,, Delaware: Middle Atlantic Governor's Coastal Resources Council, Delaware State Planning Office, 1976. 111-46 Compares assumptions, methodology, and predictions of six models forecasting onshore impacts from mid-Atlantic Outer Continental Shelf (OCS) developments. [511 Copley International Corporation. Health Impacts of Environmental Pollution in Energy Development Impacted Communities: Vol. I and II. Denver; Office of Energy Activities, Environmental Prot ection Agency, Region VIII, September 1976. Procedures and methodology volume to be released presently. [521 New England River Basin Commission. Onshore Facilities Related to Offshore Oil and Gas Development. Vol. I: "Factbook"; Vol. II: "Estimates for New England-."' Boston, Massachusetts, April 1977. Volume III, "Methodology," presently being reviewed and approved for circulation. [531 Stenehjem, Erik-J.; Hoover, L. John; Krohm, Gregory C. On Analysis of the Sensitivities of Local Socioeconomic Impacts to Variations in the Types and Rates of Coal Development and Differences in Local Site Characteristics. Argonne, Illinois: Energy and Environmental Systems Division, Argonne National Laboratory, February 1977. [54] Denver Research Institute. Analysis of Financing Problems in Coal and Oil Shale Boom Towns. Washington, D. C.: Environmental Policy Office, Federal Energy Administration, July 1976. National Tech- nical Information System Report No. FEA/b-76/361. [55] Bureau of Reclamation, Department of the Interior. Final Environmental Statement,, Proposed Western Gasification Company (WESCO), Coal Gasification Project, and Expansion of Navajo Mine by Utah Inter- national Inc., San Juan County, New Mexico. Salt Lake City: Upper Colorado Regional Office, 1976. Figure 4: Descriptive Summary of Projection Studies: Inputs, Outputs and Processes Projection Studies Reviewed Summary. Characteristics 1 2 3 4 56 7 8 9 10 11 12 13 14 15 165 17 IS e 20 21 222324 25 262728 29303132 33 Input wariablift.- Data the Laer must, supply - Basic. Emalayment Ake, 10 Ole * Populo lion 0 Energy Production output or capital investment expenditures 0 income, Wpul Variables -Types of impacts predicted : Basic Employment is0 Secondary Employment Single category, filluiliole cate ri"3 90 Pdpwatiane I Single category 0 0 0 of 0 let- Multiple categories 9 10 of Ole 0 Housing 010 010 0 0 10 10 9 Personal Income Single category 010 .0.0 Multiple catego 0 1 1 0 0 *Re fail Services ties I I 1 01 - lei Sales volume *1010 101 1- 0 010 0, Space Requirements 0 101 1 !a *10 *Public Services 1 0 1 Not Distinguished by Type 0 1 1 1IQ Education I I I*- Grade Levels Distinguished 00 0. *10 Of* lei* 1*1 01 -.0 1 1 0 1 1* Grade Levels Not Distinguished 1 49 1 1 .01 10 1 i 1 1 Capi!cl /Operation impacts Distinguished 0 to o 4010 001, 0 0 1 *1 0 1 Ccpital/Dperation. Impacts Not Distirtq. 0, Water and Sewerage 1 14 1 0 Caoital/00aration Impacts Distinguished I I I . Copitai/Operation impacts Not Disting. 0 ol of 1 10 Roads and Highways I - _W@_ C a p i I a I / 0 p er c@ io r, Impacts Distinguished 010 0 1010 0, -I* *1 0 tapdal/Operalion: Impacts Not Disting,. other Public Services Capitcl/Operation impacts Distinguished 0 of -0 101 to I 1 00 *1 10101 Capita I/ Operation Impacts Not Disting. 0 0 0 0 1*1 � Public E x penditutes 0 Single category ol 0 0 0 Multiple categories z 09 1 10 -0 *lei*- 0 *1 0 1 Copitcl/Operation Impacts Distinguished 0 *1*1 10 0 0 *lei* -0 0 Capitol /Operation Impacts Not D,sting. 09 *1 1 1 1 � P,,blic Revenue I I I lei General Revalue (Source-Not Distinguished,) 0 1 1 1 101 0of Properly Tom 0 11* 9 0 *1010 C I Wo 0 1 0 Is 01910 Sales Tax 0 110 lei* I I 1* 0 1 0 0 7_410 income 7ox IQ 01*101 101 1 1610161 1 1 1 of I Royalties and Severance Tax 0 10101 Cs I 1 0 Transfer Pcymer%T@ 10 0 !o 0 io 1 1*101 1 other 9 of 10 1 * 0 Public Revenue /Expenditure Comparison 0 a 0 0 1&1 010, 19 1 1 10 0 1 G,?oq,cpnic Limits of Analysis *MLniCiPCl I 11* 1* 10101 !01 1 lei 0 *1 1 eL 10iol I S chool D istr, C! 61 1 County *101 0, 1 11 0 *lei* 0, 1 *1 01 101 10101 1 iololot *Multi -County Region I 1 1010 *1 1 1* Is *1 010101 to 04911 1 1 1 101*1 411 1 9 State 1 0101 1 10 1 1 1 1 40 eVLIopmen? Stages *Consider OnIV 'Operation Stage Impacts 101 ix Distinguish Construction /Operation Stage Impacts - 0 00 10 *A 1*10 0 411 0 0 0, 0 9 0 Combine Construction /Operation Stage Impacts 49 Time Chcracl Erfstics - Frecuercy of Projec4ed Output - . Annucl *1 0 49 00 0 0 00 0 01401 1 IQ !*I l*1910@4@ 10 1* - @wrquenn.cl *T- 0 0 61 1 Is lei - Decennial I I I f 1111 11 1 1 1 On6 Year for average year) 0 10 1 0 0 Vier 1 0 5 `@!OthematiCol Mcdels-Type@ Used for Projections Gravity 101 1 11 Collort-Survivall. I 1 1, 1 1 1 141141161 Input/output 0 0, 1 1 1 simulation 0 0 0 40 0 i i I 1 101 1 Coefficients 101 1 01610 9 Exoort-Base Multipliers 10 iooiol@lpl Well 1*1 ;:':1 JolcoT 10( 1 i I *Adequacy Standards 10101 1 1*@ Nurntiers correspond to references in text see Part 2A few models distinguisn cepital/creration impacts without predicting both types of impacts Multipie categories not including sepcrote consideration for Construction and operating impcc!s, 4 Water used per year 3 'Irregular 2-5 month periods, 6-year span IV-1 PART IV X@ferences (Alphahetical) 4. Anticipated Effects of Major Coal Developm!@,nt on Services, Costs and Revenues in Six Selected Counties. Blireauof Reclamation, Billings, Montana; The Center for Interdisciplinary Studies, Montana State University,.Bozeman, Montana, September 1974. 29. The Anticipated Impact of Colstrip Generators #3 and #4 on Public Services, Housing and Commercial Services in Colstrip, Forsyth. Bozeman: Center for Interdisciplinary Studies, Montana State University, July, 1974. Arthur D. Little, Inc. Analysis of Selected Impacts of Trident-Related Population Growth in Kitsap County. Seattle:' Central Puget Sound Economic Development District, December 1975. 25. Baldwin, Thomas E.; Dixon-Davis, Diana; Metzger, James E.; Stenehjem, Erik J. A Framework for Detailed Site-Specific Studies of Local Socioeconomic Impacts from Energy Development. Energy and Environ- mental Systems Division. Argonne, Illinois: Argonne National Laboratory, December 1976. 24. Baldwin, Thomas E.; Dixon-Davis, Diana; Stenehjem, Erik J.; and Vdlsko, Thomas D. A Socioeconomic Assessment of Energy Development in a. Small Rural County: Coal Gasification in Mercer County, North Dakota, Volume I. Argonne, Illinois: Argonne National Laboratory, August 1976. 34. Bender, Lloyd D. Predicting Employment in Four Regions of the Western United States. Technical Bulletin No. 1529. Washington, D.C.: U.S. Department of Agriculture, Economic Research Service, with the Montana State University, Agricultural Experiment Station, 1975. 35. Bender, Llovd D. and Coltrane, Robert I. Ancillary Employment Multipliers for the'Northern Plains Province, Washington, D.C.: U.S. Department of Agriculture, Economic Development Division, Economic Research Service, 1975. 32. Bickert, Browne, Coddington and Associates Inc. "Estimates of Public Sector Financial Needs, Six Western Colorado Communities." Volume II of Boom Town Financing Study. Denver: The Boom Town Financing Study, Colorado Department of Local Affairs, Office of Rural Development, July 1976. 2. Booz, Allen and Hamilton, Inc. A Procedures Manual. Billings, Montana: Old West Regional Commission, 1974. 3. Bruckner, Lawrence A. and McKay, Michael D. A Local Impact Model. LA-6665-M.S, Los Alamos, New Mexico: Los Alamos Scientific Laboratory, January 1977. IV-2 55.' Bureau of Reclamation, Department of the Interior. Final Environmental Statement, Proposed Western Gasification Company (WESCO) Coal Gasification Project, and Expansion of Navajo Mine by Utah Inter- national Inc., San Juan County, New Mexico. Salt Lake City: Upper Colorado Regional Office, 1976. 22. Carlson, John F.; Doll, G. Fred; Phillips, Clynn; Lofgren, Joyce; and Brock, James W. The North Platte River Basin Economic Simulation Model, A Technical Report and Supplement. Laramie: Water Resources Research Institute, University of Wyoming, 1976. 20. Coal and Uranium Development of the Powder River Basin -- An Impact Analysis.. Cheyenne, Wyoming: Wyoming Department of Economic Planning and Development, 1974. 51. Copley International Corporation. Health Impacts of Environmental Pollution in Energy Deve122ment Impacted Communities: Vol. I and II. Denver: Office of Energy Activities, Environmental Protection Agency, Region VIII, September 1976. 5.. Dalsted, Norman M. L.; Leistritz, F. L.; Hertsgaard, T. A.; Frasse, R. G.; Anderson, R.. Econo ic Impact of Alternative Energy Devel- opment Patterns in North Dakota. Denver, Colorado: Northern Great Plains Resources Program, June 1974. 54. Denver Research Institute. Analysis of Financing Problems in Coal and Oil Shale Boom Towns. Washington, D.C.: Environmental Policy Office, Federal Energy Administration, July 1976. National Tech- nical Information System Report No. FEA/D-76/361. 6. Development Research Associates and Gruen Associates. Chapter III from Housing and Community__Services for Coal Gasification Complexes Propos6d on the Navijo Reservation. Framington, New Mexico: El Paso Natural Gas Company, 1974. Available from El Paso Energy Resources Company, Framington. 7. Doran, Richard K.; Duff, Mary K.; Gilmore, John S. Socio-economic Impacts of Proposed Burlington Northern and Chic*aSo North Western Rail Line in Campbell-Converse Counties, Wyoming. Denver, Colorado: Denver Research Institute, May 1974. 16. Effects of Coal Development in the Northern Great Plains. Denver, Colorado: Northern Great Plains Resources Program, 1975. 8. Ford, Andrew. Users' Guide to the BOOM.1 Model. LA-6424-MS. Los Alamos, New Mexico: Los Alamos National Laboratory, September 1976. Summary Description of the BOOM1 Model. LA-6396-1-IS Los Alsmos, New Mexico; Los Alamos National Laboratory, August 1976. 1@ 1 38. Forrester, Jay W. Industrial Dynamics.. Cambridge, Massachusetts: M.I.T. Press, 1961. IV-3 28. Freudenthal,.David D.; Ricciardelli, Peter; and York, Michael N_ Coal Development Alternatives: An Assessment of Water Use and Economic Implications. Cheyenne, Wyoming- Prepared by the. Wyoming.Departmen@ -of Economic Planning and Development for the Wyoming Legislative Special Subcommittee on Consumptive Water Use, 1974, 39. Goodman, M. R. Study Notes in System Dynamica. Cambridge, Massachu- setts: Wright-Allen Press, 1974. 40. Hamilton, H. R., et al. Systems Simulation for Regional Analysis: An Application to River Basin Planning, Cambridge, Massachusetts: M.I.T. Press, 1969. 42. Harris, Curtis C. The Urban Economies, 1985: A Multiregional, Multi-Industry Forecasting Model. Lexington, Mass.: Lexington Books, 1973. 48. Hertsgaard, Thor A.; Murdock, Steven H.; Henry, Mark; and Ludtke, Richard. The REAP Economic-Demographic Model: Technical Description. Bismarck: North Dakota Regional Environmental Assessment Program, 1977. la. Horsley, John C.; Isaki, Paul S.; Jensen, Kenneth A. The Trident Submarine Comes to Kitsap County: An Analysis of Secondary Community Impacts. A paper delivered at the Tenth Annual Pacific Northwest Regional Economic Conference, Victoria, British Columbia, May 7, 1976. Seattle: Central Puget Sound Economic Development District, 1976. 1, Intermountain Planners and Wirth-Berger Associates. Capital Facilities Study: Powder River Basin., Cheyenne: Wyoming Department of Economic Planning and Development, 1974. Received from Cumin Associates, Billings, Montana. 10. Krutilla John V. and Fisher, Anthony C., with Rice, Richard E. The Regional Economic and Fiscal Impacts of Energy Resource Development: A Case Study of Northern Great Plains Coal. Washington, D.C.. Resources for the Future, Inc., 1976. 30, Leholm, Arlen G.; Dalsted, Norman L.; Toman, Norman E,; Leistritz, F. Larry; Hertsgaard, Thor A.; Coon, Randel C. Economic Impacts of Construction and Operation of Coyote Station #1 Electrical Generation Plant and Expansion of Coal Handling Facilities at the Beulah Mine of Knife River Coal Company. Prepared for Sterns- Rogers,-Inc., Denver. Fargo, North Dakota: Department of Agri- cultural Economics, North Dakota State University, May 1976. IV4 lla. Leholm, Arlen G.; Leistritz, F. Larry; Hertsgaard, Thor A. Fiscal Impact of a New Industry in a Rural Area: A Coal Gasification Plant in Western Northern Dakota. Paper presented at the Seventh Annual'Meeting, Mid-Continent Section, Regional Science Association, Duluth, Minnesota, June 13-14, 1975. Fargo, North Dakota; Depart- ment of Agricultural Economics, North Dakota State University, 1975. 11. Leholm, Arlen G.; Leistritz, F. Larry; Hertsgaard, Thor A. Local Impacts of Energy Resources Development in the Northern Great Plains Region. Denver, Colorado: Norther Great Plains Resources Program, September 1974. 47. Leistritz, F. Larry and Murdock, Steven H. Research Methodology Applicable to Community Adjustments to Public Land Use Alterna- tives. Fargo, North Dakota: Department of Agricultural Economics, Department of Sociology, North Dakota State University, March 1977. 12. Luken, Ralph A. Economic and Social IEpacts.of Coal Development in the 1970's for Mercer County, North Dakota. Prepared by Thomas E. Carroll Associates, Denver: Old West Regional Commission, 1974. 41. Matson, R. A. "Recommended Modifications of Industrial Projection Routines for Application of the Batelle-TVA Simulation Model to the North Platte River Study Area in Wyoming." (Unpublished Working Paper.) 13. Matson, Roger A. and Studer, Jeanette B. 'Energy Resources Development in Wyoming's Powder River Basin: An Assessment of Potential Social and Economic Impacts. Prepared by the Wyoming Water Resources Research Institute. Denver: Northern Great Plains Resources Program, 1974. 14. Maxwell, Lynn C. and Neesham, K. A Model for County Population Projed- tions. Laramie, Wyoming: Division of Business and Economic Research, University of Wyoming, June 1973. Prepared for the Wyoming Department of Economic Planning and Development. 52. New England River Basin Commission. Onshore Facilities Related to Offshore Oil and Gas Development. Vol. I: "Factbook"; Vol. II: "Estimates for New England." Boston, Massachusetts, April 1977. 49. North Dakota Regional Environmental Assessme nt Program. The REAP Economic Demogrphic Modell: User Manual. Bismarck: North Dakota REAP, State Capitol, December 1976. 44. OBERS model, special run prepared for the U.S. Waters Res ources.Council, by the U.S. Department of Commerce, Social and Economic Statistics Administration, Bureau of Economic Analysis, Regional Economics Division, and U.S. Department of Agriculture (Economic Research Service, Natural Resources Economics Division), 1972. iv-5 15. Polzin, Paul A. Water Use and Coal Development in Eastern Montana.. Bozeman, Montana: Montana University Joint Water Resources Research Center, November 1974. 23. Research and Planning Consultants. Offshore Oil: Its Impact on Texas Communities. Austin, Texas: Texas General Land Office, February 1977. 50. Resource Planning Associates, Inc. Identification and Analvsis of Mid-Atlantic Onshore OCS Impacts. Dover, Delaware: Middle Atlantic Governor's Coastal Resources Council, Delaware State Planning Office, 1976. 33. Ryan, J. J. and Welles, J. G. Regional Economic Imp@ct of a U.S. Oil Shale Industry. No. 1: Public Policy Studies of a U.S. Oil Shale Industry. Denver, Colorado: Denver Research Institute,.University of Denver, 1966. 36. Sand, Larry Dean. Analysis of Effects of Income Changes on Inter- sectoral and Interconmuni@_y Economic Structure. (Unpublished Master's Thesis). Fargo, North Dakota: Department of Agricultural Economics, North Dakota State University, August 1966. 31. Schuller, C. Richard and Hiltunen, Ronald A. A Generalized Public Budget Analysis. ONRL/RUS-22. Oak Ridge,i Tennessee: Oak Ridge National Laboratory, Regional Environmental Systems Analysis Program, September 1976. 37. Senechal, Donald M. Analysis of Validity of North.Dakota Input-- Output Models. (Unpublished Master's Thesis). Fargo, North Dakota: Department of Agricultural Economics, North Dakota State University, August 1971. 46. Stenehjem, Erik J. Forecasting the Local Economic Impacts of Energy Resource Development: A Methodological Approach* Argonne, Illinois: Argonne National Laboratory, Energy and Environmental Systems Division, December 1975. Document No. ANL/AA-3. 26. Stenehjem, Erik J.; Baldwin, Thomas E.; Metzger, James E.; Dixon-Davis, Diana. A Framework for Comparative Analysis of Socioeconomic Impact: Case-I. Argonne, Illinois: Argonne National Laboratory, December 1976. 6M, Erik J.; Hoover, L. John;' Krohm, Gregory C. An Analysis 53. Sten-e-hj of the Sensitivities of Local Socioeconomic Impacts to Variations in the Types and Rates of Coal Development and Differences in Local Site Characteristics. Argonne, Illinois: Energy and Environmental Systems Division, Argonne National Laboratory, February 1977. 01 IV- 6 27a. Stenehjem, Erik J. and Metzger, James E. A Frarnbwork. for Projecting r Employment and Population_Changes Accompanying Energy Development: Phase I. Argonne, Illinois: Argonne National Laboratory, August 1976. 27b. Stenehjem, Erik J. and Metzger, James E. A Framework for Projecting Employment and Population Changes Accompanying Energy Development: 01- Phase II. Argonne, Illinois: Argonne National Laboratory, October 1976. 21. THK Associates, Inc. Impact Analysis and Development Patterns for the Oil Shale Region. Denver, Colorado: Colorado West Area Council of Governments and The Oil Shale Regional Planning Commission, February 1974. 17. University of Denver Research Institute. Factors Influencing an Area's ME Ability to Absorb A Large-Scale Commercial Coal-Processing Complex A Case Study of the Fort Union Lignite Region. Washington, D.C. Energy Research and Development Administration, Fossil Fuels, 1975. (N.T.I.S. Report # FE-1526-2.) 43. University of Denver Research Institute. The Social, Economic, and Land Use ImRacts -of a. Fort Union Coal Processing Complex. Final Report for ERDA Fossil Fuels, August 1975. 18. Wistisen, Martin J. and Nelson, Glen T. Kaiparowits Socio-Economic Study. Provo, Utah: Center for Business and Economic Research at Brigham Young University, 1973. Prepared for Bechtel Power Corporation. 19. Woodward-Clyde Consultants. Environmental Impact Report, North Dakota Gasification Project. Bismarck, North Dakota: ANG Coal Gasifi- cation Company, 1975. The Laboratory of Architecture and Planning (LAP) provides a piece within MIT's School of Architecture and Planning for students, faculty, and invited practitioners to explore current problems and issues in their fields. Under the LAP's auspices, and in cooperation with various government agencies, foundations, and private industry, projects dealing with the environment, citizen participation, environmental design, energy, and other topics are undertaken. Documents produced during the course of these projects are through the LAP's Publications Program. NOAA COASTAL SERVICES CENTER LIBRARY 3 6668 00002 8110