		<mainTitle nfc="0"><title>Marine industrial development options for Glen Cove</title>:<titleExt>a preliminary assessment.</titleExt></mainTitle>
		<titleVariant><title>Port of Port Townsend and Washington State Department of Ecology</title></titleVariant>
	</titleStmt>
	<authorStmt>
		<persAuthor><name type="surname">Horton, Michael G.</name></persAuthor>
		<corpAuthor><name type="jurisdiction">Washington (State).</name><subName>Dept. of Ecology.</subName></corpAuthor>
		<corpAuthor><name type="jurisdiction">United States.</name><subName>National Oceanic and Atmospheric Administration.</subName></corpAuthor>
		<corpAuthor><name>Tippetts-Abbett-McCarthy-Stratton.</name></corpAuthor>
	</authorStmt>
	<imprint><pubPlace>Seattle, Wash.</pubPlace>:<pubName>TAMS Engineers</pubName>,<pubDate>1985.</pubDate></imprint>
	<classStmt>
		<locClass>
			<subject cat="top">Waterfronts</subject>
			<subject cat="geo">Washington (State)</subject>
			<subject cat="geo">Port Townsend (Wash.)</subject>
		</locClass>
		<locClass>
			<subject cat="top">Land use</subject>
			<subject cat="geo">Washington (State)</subject>
			<subject cat="geo">Port Townsend (Wash.)</subject>
		</locClass>
		<locClass>
			<subject cat="top">Industrialization</subject>
			<subject cat="geo">Washington (State)</subject>
			<subject cat="geo">Port Townsend (Wash.)</subject>
		</locClass>
	</classStmt>
</metadata>

<text xml:space="preserve">
<pb n="1" />

     HD
     2329
     .M37
     1985
     c.2
<pb n="2" />

                               PORT OF PORT TOWNSEND

                                                      AND

          WASHINGTON STATE DEPARTMENT OF ECOLOGY

            MARINE INDUSTRIAL DEVELOPMENT OPTIONS

                                                     FOR
                                             GLEN COVE

                                 A PRELIMINARY ASSESSMENT

                                                  JUNE 1985

             THE PREPARATION OF THIS REPORT WAS FINANCIALLY AIDED THROUGH
               A GRANT FROM THE WASHINGTON STATE DEPARTMENT OF ECOLOGY

            WITH FUNDS OBTAINED FROM THE NATIONAL OCEANIC AND ATMOSPHERIC

                 ADMINISTRATION, AND APPROPRIATED FOR SECTION 306 OF THE
                              COASTAL ZONE MANAGEMENT ACT OF 1972.

                                                TAMS
                          TIPPETTS-ABBETT-MCCARTHY-STRATTON-ENGINEERS AND PLANNERS
<pb n="3" />

                  PORT OF PORT TOWNSEND

                                 AND

    WASHINGTON STATE DEPARTMENT OF ECOLOGY

      MARINE INDUSTRIAL DEVELOPMENT OPTIONS

                                 FOR
                           GLEN COVE Property
                                                              ry

                    A PRE LIMINARY ASSESSMENT

                              JUNE 1985      U - S - DEPARTMENT OF COMMERCE NOAA
                                             COASTAL SERVICES CENTER
                                             2234 SOUTH HOBSON AVENUE
                                             CHARLESTON, SC 29405-2413

      THE PREPARATION OF THIS REPORT WAS FINANCIALLY AIDED THROUGH
       A GRANT FROM THE WASHINGTON STATE DEPARTMENT OF ECOLOGY

      WITH FUNDS OBTAINED FROM THE NATIONAL OCEANIC AND ATMOSPHERIC

         ADMINISTRATION, AND APPROPRIATED FOR SECTION 306 OF THE
            ?f- RCOASTAL ZONE MANAGEMENT ACT OF 1972.'
           f3@ WA

            /STE
             AL               rVA MS
               TIPPETrS-ABBETT-McCARTHY-STRATTON 9 ENGINEERS AND PLANNERS

     (-6
<pb n="4" />

                                           ABSTRACT

         1: Author:

           Michael G. Horton, TAMS Engineers, Seattle, Washington.

         2: Subject:

           Waterfront Industrial Land Use Assessment - Glen Cove, Port Townsend

         3: Published: June 15, 1985
         4: Sponsors:

           Washington State Department of Ecology and the Port of Port Townsend

         5: Source of Copies:

           Port of Port Townsend,
           2529 Washington Street,
           Port Townsend, WA 98368

         6: WDOE Project No. G 085016 B
         7: Series No.     N/A
         8: Number of Pages 39
         9: ABSTRACT

         The Glen Cove Site, located just outside the southern boundary of the
         city of Port Townsend is a 300 acre area which has been designated
         for industrial use in the Jefferson County Comprehensive Master
         Plan.     The natural slopes over the entire area are relatively steep,
         and access to the water is gained through a paved road known as Ferry
         Street.

         The study is a preliminary investigation of waterfront related
         industrial options for the site.            Demand is briefly discussed in
         order to derive functional requirements for each alternative and
         construction costs are presented. Potential environmental concerns
         form a major part of the analysis.

         The major conclusion of the study is that the topography of the
         uplands and the shallow water depth in Glen Cove are significant
         constraints to the development of industries such as a commercial
         shipyard,    pleasure craft repair yard or marine cargo handling
         terminal.     The only area readily available for medium or large scale
         waterfront industrial use is a freshwater lagoon owned by the Port
         Townsend Paper Company which was seen to support various species of
         aquatic birds, wildfowl and small mammals.

         The location of a marina at the site is a long term option when the
         capability to extend the present Port Townsend Boat Haven has been
         exhausted. Dredge and fill requirements in the intertidal zone would
         be significant environmental concerns.

         Developments that appear to be more compatible with the site are a
         fish processing plant or non water related industries based on 5 acre
         parcels.     The site would also be a good location for a boat launch
         ramp.
<pb n="5" />

                                 CONTENTS

                                                                PAGE No.
        1. STUDY OBJECTIVES    . . . . . . . . . . . . . . . .      1
        2. SITE CHARACTERISTICS      . . . . . . . . . . . . . .    2
         NAVIGATION . . . . . . . .                                 2
         CURRENTS AND LITTORAL DRIFT                                2
         WAVES .....................                                2
         TIDES  . . . . ..........                                   3
         WATER ACTIVITIES     GENERAL                             3
         LAND USE AND PROPERTY OWNERSHIP      . . . . . . . . . .   4
         UPLANDS GEOTECHNICAL CHARACTERISTICS     . . . . . . . .   4
         TOPOGRAPHY . . . . . . . . . . . . . . . . . . . .         5
         ACCESS . . . . .................................... 5
         UTILITIES  . . . . . . . . . . . . . . . . .               6
         ENVIRONMENTAL CHARACTERISTICS     . . . . . . .            6
          BEACH AND INTERTIDAL ZONE   . . . . . . . . . . . .       7
          LAGOONS................................................: 7
          VEGETATION   . . . . . . . . . . . . . . .. .           . 8
       3.PORT OF PORT TOWNSEND COMPREHENSIVE MASTER PLAN        . 9
        4. PERMITTING PROCESS . .                                   9
        5. POTENTIAL USES OF GLEN C0VE:                            12
         BOAT REPAIR . . .                                          12
          COMMERCIAL SHIP REPAIR YARD:                             12
          PLEASURE AND SMALL COMMERCIAL BOAT     REPAIR  . . . . .  15
         PLEASURE BOAT MOORAGE     . . . . . . . . . . . . . .      18
         DRY STORAGE MARINA   . . . . . . . . . . .                 21
         FISHERIES ...................................               24
         FISH PROCESSING PLANT     . . . . . . . . . . . . . . .    24
         AQUACULTURE   . . . . . . . . . . . . . . . . . . .        26
         MARINE TERMINAL   . . . . . . . . . . . . . . . . .       27
          FERRY TERMINAL   . . . . . . . . . . . . . . . . . .      27
          GENERAL CARGO TERMINAL     . . . . . . . . . . . . . .    27
         OIL RELATED INDUSTRIES    . . . . . . . . . . . . . . .    30
          OIL RIG PLATFORMS   . . . . . . . . . . . .               30
          NORTH SLOPE MODULES   . . . . . . .............             31
         BOAT LAUNCH FACILITY   . . . . . . ............. . . . .   32
         SUMMARY  . . . . .  ...................................... 35

        REFERENCES  . . . . . . . . . . . . . . . .       . . . .  38
<pb n="6" />

                               LIST OF FIGURES

            FIGURE                  TITLE            Following Page No.

              1.1       Site Plan  . . . . . . . .    0 . 0 . .1

              2.1       Wave Heights  . . . . . . . . . . . .   2

              2.2       Property ownership  . . . . . . . . .   4

              2.3       Existing Land and Water use .      . .  .4
              2.4       Geotechnical Characteristics.      - .  .'4

              2.5       Site Topography   . . . . . . . . . .   5

              2.6       Utilities Layout  . . . . . . . . . .   6

              2.7       Marine Habitats and Uplands     . . . . 7
                        Natural Resources

              5.1       Commercial Vessel Repair Yard      . . .12

              5.2       Pleasure Craft Repair Yard    . . . . . 15

              5.3       Marina - Conceptual Plan   . . . . . .  19

              5.4       Dry Storage Yard     . . . . . . . . .  22

              5.5       Fish Processing Facility   . . . . . .  24

              5.6       Barge Terminal    . . . . . . . . . .   28

              5.7       Small Boat Launch Ramp   . . . . .   a .33
<pb n="7" />

        1: STUDY OBJECTIVES

        The   following     analysis addresses a number of alternative
        development scenarios for the Glen Cove site. The area shown in
        Fig.    1.1   has    been    identified     in the Jefferson County
        Comprehensive Master Plan as a major industrial area containing
        approximately 300 acres of developable land and a mile of
        waterfront.      Development options reflect the classification of
        the area and are generally limited to industries requiring
        waterfront access or adjacency. The purpose of the study is to
        provide a review of the suitability of the site for a number of
        classes of waterfront related industrial developments.                  In
        reviewing alternatives, a brief assessment of overall planning
        requirements is presented but the reader is cautioned that
        demand, economic feasibility and conflict or compatibility with
        existing facilities are not addressed in detail.

        It is also recognized that although the list of opportunities
        studied    in    this report is limited to waterfront related
        industries, the site has a number of advantages for a variety of
        potential businesses which do not require dire'et access to the

        water.
<pb n="8" />

                                                                              CITY BOUNDARY

                                                                                                           &lt;
                                                                                                           211       s
                                                                                                           off
                                                                                                              if

                                                               44'(s        MILL ROAD

                        X
                 0      1-
                 z      cr         I          4f                                                                                                0
                 Lu     0                  A 4f
                                                                                                                    PORT
                                                                                                                 TOWNSEND
                 0                                                                                                  PAPER
                                                                                                                  COMPANY
                 cr lu                If
                 0                   j#                    -                                                    KRAFT MILL
                 (L                                  00                                                                  w
                 0      11 GLEN   It                 6
                 C14                                           1-1-1 -T -T-T                                                                        40-
                 ir     N                 oi-
                                  Lu
                                  z
                                                  OAD  I  CARROLL AVE.
                                  uj

                                  a@        So. 7 TH ST

                                                          STEVENS                                                                     I
                                                           AVE.             So. 5 TH ST.

                               C)
                               CL                                       It

                 ZOO                                                         3:

                                                                                                                                 G L E N

                                                                                 FERRY ST.                                             C 0 V E

                                                   ki
                           YVI'EW ST
                        1@13A

                                                "16
                 GLENCOVE.1-                                                                                      STUDY AREA\BOUNDARY
                 INDUSTRIAL
                 PARK

          SETON ROAD

                                                                                                                                           N

                                                                   r------------
                                                                                        OLD FORT TOWNSEND STATE PARK
                            OLD FT TOWNSEND ROAD                   I

                                                                G L E N       C 0 V E      INDUSTRIAL               A N A L Y S I S
           0            500       1000
            ArrRox. SCALF (rFFT)                                              FIG. 1.1            SITE PLAN
<pb n="9" />

       2: SITE CHARACTERISTICS

       2.1: NAVIGATION

       The sea bed in front of Glen Cove shelves at an initial slope of
       2 percent to 1.3 percent to the 1 fathom line and then steepens
       to about 4 percent to a mid channel depth of 60 to 85 ft. The
       40 ft contourt which is considered to be adequate for cargo
       vessel navigation is located some 1,000 to 1,200 ft from the
       beach line.

       The approaches to the area are therefore adequate for most
       modern cargo or commercial vessels as evidenced by the use of
       the Port Townsend Paper Company pier by ships in the 20,000 to
       30,000 deadweight tonnage (dwt) range.

       2.2: CURRENTS AND LITTORAL DRIFT

       The Coastal Zone Atlas published by the Washington State Dept of
       Ecology indicates a north-south littoral shoreline movement from
       the Paper Company Plant to approximately the mid point of the
       beach and a south-north movement from Kala Point northwards.

       The drift trend has created the fine sand crescent accretion
       beach shown in Fig. 2.1, which extends from the Paper Plant to
       the commencement of the Bluff where coarser gravels are found.

       Currents in the Cove are mild, circulatory and tidal, being
       dominated by the Oak    Bay Cut (Portage Canal) - Port Townsend
       confluence which generates mid channel currents up to 3.0 knots
       at maximum ebb and flow.

       2.3: WAVES

       As seen in Fig. 2.1, the wave climate at Glen Cove is mild as

       the north or south storm directions have limited fetch distances

       at the site. The Coastal zone Atlas indicates 6 inch to 2.0 ft
       waves from the southeast 5 percent of the time and from the east

                                     -2-
<pb n="10" />

                                                                         P(W,

                                                                     mm

                                                     Ferri

                                    S,cl

                                mc

                                         LITTORAL DRIFT (WINTER)

                                 LITTORAL DRIFT (SUMMER)

                                    1%
                           Wave
          sj              Fleight      4%                         0.5 to 2.0 FEET
                                                             S =  FINE SAND 13EACH
                            %       5%                       St = STABLE SHOR,ELINE

                               t

                                  E

                                   EB

           SOURCE: COASTAL ZONE ATLAS OF
           OF WASHINGTON

                                               G L E N  C 0 V E   INDUSTRIAL        A N A L Y S I S

                                                          FIG. 2.1 WAVE HEIGHTS
<pb n="11" />

          4 percent.       Similar wave height frequencies of 1 percent are
          also shown for north east and southerly directions.                     The
          remainder are waves of less than 6 inches which are considered
          to be calms for record purposes.

          2.4: TIDES

          Neap tidal range is approximately 5 ft with spring tide ranges
          increasing to 12 -,13 ft, typical of Upper Puget Sound. Annual
          lowest low water is of 4.5 ft below MLLW. Tidal heights are:

           Extreme High Water................12.50 ft
           Mean Higher High water ... o  ....... o.8o4O ft
           Mean High                          ..... 7.70 ft
           Mean Tide                                      ft

           Mean Lower Low Water...............0*0

           Extreme Low Water.................,4.50 ft

          2.5: WATER ACTIVITIES - GLEN COVE

          The area is used by the Port Townsend Paper Company as an
          anchorage for wood chip barges which are buoyed in Glen Cove and
          taken to the company dock for discharge, The firm also operates
          their own pier for loading exports of paper products and pulp to
          ocean going vessels.

          Plans by Sea Farms of Norway to establish an Aquaculture project
          to the south of the Cove are understood to be progressing to the
          operational stage.        The project will involve the placing of
          salmon    rearing pens approximately 1000 feet out from the
          shoreline in an area of clean water with moderate but regular

          currents,

          No buoys for small boat anchorages were observed during visits
          to the site.

                                             -3-
<pb n="12" />

         2.6: LAND USE AND PROPERTY OWNERSHIP

         Property ownership and land use are shown in Figures 2.2 and
         2.3, based upon information presented in the 1982 Glen Cove
         Water Supply study prepared by Hosey and Associates.           The
         largest parcels are owned and currently used by the Port
         Townsend Paper Company.     The northern parcel, approximately 75
         acres, is used for industrial processing and raw material
         storage at the Kraft Mill, while part of the' 204 acre southern

          ot is used for solid waste disposal.

         A residential area of some 30 to 35 single family homes is

         centered around Carroll Avenue and South 6th Street. A boat
         repair operation is located at the shoreward limit of South
         6th. No permanent haul out facilities are used by this yard.

         The primary access to the beach is through a right of way owned
         by Skookum marine, linked to the 30 acre plot shown in Fig. 2.2.

         The Glen Cove Industrial Park is located alongside highway SR 20
         at Seton Rd. and a number of industries have been established
         around Frederick St., connecting with the Park.

         The site southern boundary is limited by the old Ft Townsend
         State Park and the remainder of the study area is generally
         undeveloped.

         2.7: UPLANDS GEOTECHNICAL CHARACTERISTICS

         Geotechnical characteristics of the site are shown in Fig. 2.4.
         The lagoon areas are on generally organic silts and reworked
         fill material with the uplands portions overlaying clay deposits
         identified as "Vashon Advance Outwash

                                        -4-
<pb n="13" />

                                                         C
                                                          ITY OUNDARY
                                                             B

                X
               It                                                  POR TOWNSEND                          0
              10
                                               PTPC TREATMENT        P PER CO.
                                                  LAGOON

                                                                               17-71
                   GLEN
          X                                     I -T-                                                       40
          o
         X

                                                           SOUTH
                                                           LAGOON

                                  CROWN ZELLERBACH

                                       !5
                                     )J'      N                                   \0
         \FREDEnICK ST.                   SKOOKUM\
                                                                                              G L E N

                                                                                                  C 0 V E
                           it
                                               1_6

                                                      PORT TOWNSEND PAPER CO.      t
              ST

                                                                    If

                                      JANIS BULIS

                                                                                                WOR TH-
                                                            PARCELS SMALLER THAN 10 ACRES        INGTON
                                                r
                                                                OLD FORT TOWNSEND STATE PARK

                                              G L E N   C 0 V E   INDUSTRIAL         A N A L Y S I S

        0      r;oo    1000
        ArpsoX. SCALE (FEET)                        FIG. 2.2     PROPERTY OWNERSHIP
    IDURCE: GLEN COVE WATER SUPPLY STUDY
<pb n="14" />

                                                                CITY BOUNDARY

                                                                                          it

                                           4f

                  0                 A,                                      WOOD CHIP

                                                    WASTE PROCESSING                         OPERATING
                                 cj of                                       STO R Ati t
                                                                                             PULP Ml  L

                      GLEN    If
                                                                                                                         4
            x                      01-
                           ui I
                           z I           n                          SOUTH
                           31 11                                   LAGOON
                          uj
                          CL I

                                                 RESIDENTIAL

               ZOO-,     Of                                                                                ANCHORAGE
            @FIREDERICK ST.
                                               BOAT BUILDING                                             FOR WOOD CHIP

                                                            RESIDENTIAL                                     /BARGES

               INDUSTRIAL

                  PARK'                    kj
                                                                LAND FILL&amp;

                                                                     UNDEVELOPED
                                                                                                           PROPOSED

                                                                                                           AQUACULTURE

                                                                                                                (SALMON

                                                                                                                  FARMING)

                                                                                                                    PROJECT

                                   NOT SHADED    UNDEVELOPED

                                                      r

                                                                                STATE PARK

                                                     G L E N    C 0 V E    INDUSTRIAL          A N A L Y S I S

          0       500      1000
          Arpnox. SCALE IFEET)                                FIG. 2.3     EXISTING LAND USE
<pb n="15" />

                                                       00S

                                                               af
                                   dvtl

                   bva                   ARTIFICIAL FILL

                   Ob
                   ; .  Iaf
               via!'  -r

                                           SATURATED ORGANIC-BEARING
                                           SAND, SILT, CLAYS

                   Qva'

                                            Ob     BEACH DEPOSITS, SANDS &amp;GRAVELS

                                        's

          VASHON ADVANCE OUTWASH

                                       Ovti

              VASHON LODGEMENT FILL                         Qva@

      SOURCE: COASTAL ZONE ATLAS OF WASHINGTON

                                              G L E N   C 0 V E  INDUSTRIAL         A N A L Y S I S

                                                  FIG. 2.4 GEOTECHNICAL CHARACTERISTICS
<pb n="16" />

       2.8: TOPOGRAPHY

       As can be seen in Fig. 2.5, most of the site is composed of
       wooded slopes which average a 10 percent grade or steeper and
       the area offers very little flat land for development. The only
       level parcel greater than 10 acres is the southerly of the two
       lagoons owned by the Port Townsend Paper Company, which would
       obviously require filling before conversion to industrial use.
       This is especially restrictive for industries such as a ship
       yard or marine terminal where flat rectangular or square parcels
       which are adjacent to the water are essential to an efficient
       and economic operation.

       The transition from the uplands to the beach is evenly graded
       from the Paper Company Kraft Mill southwards for a distance of
       approximately 1,500 ft. At that point the shoreline bluff rises
       sharply to a height of 100 ft.

       Since the south lagoon is the only area within the study
       boundaries that offers the necessary 20 to 25 acre flat open
       space adjacent to the waterfront, it is therefore considered to
       be the preferred location for any major shoreside industrial
       activity.

       2.9: ACCESS

       The study area has vehicular access from Highway 20. These
       roads average 18 ft. width and are paved. However, the access
       through the Glen Cove residential area appears to be suitable
       only for light traffic. Average slopes on the entry roads are 5
       to 10 percent and the most extreme curve has a 120 ft radius.

       A non-operating rail line passes through the western edge of the
       site and would offer a good rail link if revived in part or

       whole.

                                      -5-
<pb n="17" />

                                                                      CITY BOUNDAny

                                                                   7-777.7.
                                                                 1A

                                                                                                                                   0

                                                                                                                                       40'

                                                                          SOUTH

                                                                         LAGOON

                                                                                                                     G L E N
                                         ............
                                      ..............
                                                                                                                          C 0 V E

                                                               ...........

                                                              ..........

                                                                                      N

                       Ir                                                                 .........

                                                                                               ..........

                                                                                                 ............ \:
                                                                                                   ...........
                                                                                            ...... V,   .......

                           SLOPES &gt; 10%                                                                 .......
                  EJ                                                                                     ..........
                           SLOPES     10% (APPROX.)

                  177-1
                           SLOPES &lt; 10%

                                                                                OLE) FORT TOWNSEND STATE       PARK

                                                         G L E N      C 0 V E     INDUSTRIAL             A N A L Y S I S

         0        500      1000
         APrROX. SCALE (FEETI                                       F I G. 2.5     SITE TOPOGRAPHY
<pb n="18" />

       A number of "paper' streets are shown on the Plats for the area,
       and a Right of Way extends through an extension of Frederick
       Street to the beach at Ferry Street.

       2.10: UTILITIES

       The main olympic Water Pipeline passes through the site and
       serves the paper mill. The recently constructed link from the
       10 inch City main links Otto street to the limit of the
       residential area with "tees" at Glen Cove Rd., Seton Rd. and
       Frederick Street as shown in Fig. 2.6. Plans prepared in 1982
       provide for the eventual extension of the water system to the
       entire area.

       Electricity lines follow Glen Cove Rd to the beach access and
       could easily be extended to serve additional development if
       required.

       There are no sewer lines in the area and the City of Port
       Townsend has declared that it will not provide service outside
       city boundaries.     This decision is, however, the subject for
       discussion at an upcoming joint meeting between officials from
       Jefferson County, the City of Port Townsend and the P.U.D., in
       an effort to formulate a regional policy. The steep slopes at
       the site are generally unsuitable for drain fieldsand the
       random and variable soils are a further disadvantage. Any piped
       sewer s stem would require its own local treatment plant or a
               y
       force main to the City system (assuming the necessary policy
       change) and large volume industrial waste water disposal would
       require detailed engineering and field studies.

       2.11: ENVIRONMENTAL CHARACTERISTICS

       There appears to be very little documented information on the
       environmental inventory of the area.        Annual water quality
       measurements are taken in the Cove as part of the monitoring
       process for the waste water disposal permit held by the Paper
       Company but no sampling of marine life, fauna or flora was
       available at the time of this study.

                                      -6-
<pb n="19" />

        - - - - -                      - - - - - - /                      - -TY B -0 U -ND A R-Y
         WATER LINE                                                        Cl

                                                                  POWER LINE
                                                                     ..............
                                                   4f

                                             40'

                                                   LLJ
                                       4f
               C,                     4f           (r

                           LEN...                  0                                                                                          40

                                              ..ROAD
                               uj
                                                                               SOUTH
                                                                              LAGOON

                              0-1

                             ol
              @FnEDFRICK Sr.                                                   z
                                                                              :m                                           G L E N

                                                                                                                                 C 0 V E
                                                                        6

                                                N

           SETTON ST

                                                               r  - - - - - - - - - - - - - - --
                                                                                     OLD FORT TOWNSEND STATE PARK

                                                              G L E N      C 0 V E     INDUSTRIAL               A N A L Y S I S

            0        500       1000
            APPROX. SCALE (FEET)                                          FIG. 2.6          EXISTING UTILITIES
<pb n="20" />

        The following comments therefore represent observations taken
        during a field visit to the site, discussions with agency
        representatives and information taken from the WDEC Coastal Zone

        Atlas.

        2.11.1: BEACH AND INTERTIDAL ZONE

        SHELLFISH

        The fine sand beach from the Paper Mill to the southerly bluff,
        is   reported   to support modest clam harvests although no
        commercial shellfishing is carried out in the area.         Further
        south, as shown in Fig. 2.7, geoduck beds are reportedly of
        commercial size.

        FISH

        The area is used from March to June by juvenile migrating salmon
        but no critical spawning streams were identified in the study

        area.

        Pacific   herring spawn in a 1 to 2 mile shoreline strip
        commencing at the southern half of the study shoreline opposite
        the geoduck beds.

        CRUSTACEANS

        Some Dungeness crab are believed to inhabit the sub tidal zones
        in the area although no sampling has confirmed populations or
        densities.

        2.11.2: LAGOONS

        The upper Lagoon is a waste water treatment facility for the
        paper mill and therefore supports no wildlife. The southerly
        lagoon, which is retained by the beach road, supports various
        species of wildfowl and small mammals.          No endangered or
        critical fish species were identified as inhabiting the pond.

                                        -7-
<pb n="21" />

                     U

                                  JUVENILE SALMON MIGRATION

                            SH E LLFISH/CLAMs

                                 DUNGENESSCRAB

                                                                      U    NO RECOVERABLE SANDS AND GRAVELS
                                                                      Gl     GRAVELS

                           G
                                           V",

                                     2:2 Ix'

                                             I A
                                                                GEODUCK BEDS
                                  W IN S I  'D

                                    Alt

                                                                                  Pacific Herring

         SOURCE: COASTAL ZONE ATLAS OF WASHINGTON

                                                      G L E N    C 0 v E    INDUSTRIAL           A N A L Y S I S

                                            FIG 2.7 MARINE HABITATS AND UPLANDS NATURAL RESOURCES
<pb n="22" />

       2.11.3: VEGETATION

       The uplands area supports a variety of trees and the southern
       lagoon is covered with reeds, bullrushes and aquatic plants.
       Dune grass is found above the High water mark on the sand beach

       areas.

                                    -8-
<pb n="23" />

        3: PORT OF PORT TOWNSEND COMPREHENSIVE MASTER PLAN

        Although not specifically addressed in the 1981 Port of Port
        Townsend Comprehensive       Plan, Glen Cove was suggested as a
        potential site for a heavy lift and repair         facility for boats
        over 100 ft long.         All other recommendations in the report
        emphasized the benefits of centralization of future marine
        facility development by expansion at or          adjacent to existing
        locations.

        4: PERMITTING PROCESS

        A number of federal, state, county and local permits are
        required before any development may take place at the Glen Cove
        site.     Probably the most significant are the State permits
        required    under    the Washington State Shorelines Management
        Act,the Corps of Engineers Section 10 and 404 procedures, and
        the Hydraulic Code Rules (WAC 220-110) and permit by the
        Washington State Department of Fisheries and Department of Game.

        The permitting process applies to any project proposed to impact
        wetlands, subtidal and, tidal areas below the Mean High Water
        line and all uplands within 200 feet of Mean High Water. This
        includes    dredging,    landfill    or over water fill, or any
        artificial structure construction, and         a large or sensitive
        project    will    also require Environmental Impact Statements
        prepared under the requirements of the National Environmental
        Policy Act (NEPA) of 1969 and the State Environmental Act
        (SEPA).

        Greatly simplified, the procedures involve the submittal, to the
        US Army Corps of Engineers, applicable state agencies, and the
        county of separate permit applications outlining the size,
        components, materials quantities and location of the proposed
        work.     Both the Shorelines Management Act and Corps section
        10-404    processes require public notice periods and public
        hearings.        Public agencies and interested private groups
        typically involved might include:

                                          -9-
<pb n="24" />

       Federal Agencies

           EPA
           Corps in house groups (Hydraulics, Coastal engineering,
           Regulatory functions).
           US Fish and Wildlife Service
           National oceanic and Atmospheric Administration (NOAA)
           National Marine Fisheries Service (NMFS)
           US Coastguard

       Washington State Agencies
           Dept of Ecology
           Dept of Fisheries
           Dept of Game
           Dept of Transportation
           Dept of Natural Resources
         - Archaeology and Historic Preservation office
         - Conservation Commission

       Jefferson County (Shoreline Management Act, Highways, Planning)
       City of Port Townsend
       Adjacent Land owners.
       Special Interest Groups
       Local Indian Tribes
       Interested private individuals.

       Following the review and comment period, one or more public
       hearings are held to discuss the application. If Environmental
       Impact Statements are required under NEPA and SEPA regulations
       they   must    address  agency and citizen concerns, consider
       alternative locations for the project and clearly establish the
       need for the work, address environmental impacts and propose
       mitigation measures to replace loss of intertidal habitat,
       wetlands etc,

       If all identified local, state, and regional concerns are
       addressed to the satisfaction of the agencies of jurisdiction,
       the necessary permits will then be issued.

                                     -10-
<pb n="25" />

        Evaluation factors used by the agencies in their review include:

         Aesthetics

         Air Quality
         Coastal and Shoreline Processes

         Conservation

         Economics

         Energy demands
         Fish and Wildlife values
         Flood damage Prevention

         Food Production

         Historic and cultural Resource values
         Impact on infrastructure
         Impact on adjacent property owners
         Land use appropriateness
         Navigation
         Need for the Project
         Physical environment
         Public Safety
         Recreational Impacts
         Traffic impacts
         Waste disposal - solids and liquids
         Water Quality

             The County, State, and the U.S. Corps of Engineers consider
             "Need for Project" to be an extremely important factor when
             evaluating applications for projects in areas that are
             sensitive    biologically   or where citizen concerns are
             significant.        In  general,    agencies will object to
             speculative projects unless there is a strong positive
             market or demand analysis to support the application.
<pb n="26" />

        5: POTENTIAL USES OF GLEN COVE

        5.1: BOAT REPAIR

        5.1.1: COMMERCIAL SHIP REPAIR YARD

        DEMAND

        As a boat repair center, Port Townsend currently offers haul-out
        storage and repair facilities to pleasure and commercial craft
        up to a total weight of 60 tons. In planning for additional
        facilities it is logical to address existing demand that cannot
        be accommodated at the existing facilities in the area.

        These vessels include Bering Sea crabbers and draggers and the
        newer breeds of catcher processor vessel in the slowly and
        steadily expanding Northwest and Alaskan bottom fisheries.

        FUNCTIONAL REQUIREMENTS

        As distances to the fishing grounds have increased, the trend is
        to larger vessels and a typical offshore vessel is now 150 feet
        long.   In establishing planning criteria for a repair and
        service facility for commercial boats, fishing or otherwise, it
        is important to realize that 90 percent of all work is carried
        out while the vessel is at a wet dock and not on a ramp or
        marine hoist. Hence dry storage and shoreside work areas are
        less critical to the overall viability of a project than the
        need to provide adequate dockside footage and adjacent working
        area for on board repairs and maintenance. A commercial repair
        yard capable of offering a full and competitive service to the
        fleet would require the following elements as illustrated in
        Fig. 5.1.

                                     -12-
<pb n="27" />

                                         N

               I- " oov

           FUTURE REPAIR BAYS
                   \T\          SIDE TRANSFE R PIT

                                                   REPAIR BAYS

                                                                  f

                                                             MARINE RAIL
                                                             OR SYNCROLIFT

                                                                                           DOCKSIDE
                          WORKSHOPS/                                                           REPAIR PIER
                          ADMIN.

                           N PARKING

                                             G L E N  c 0 v E   INDUSTRIAL        A N A L Y S I S
                                                    0\, @'

                                              FIG. 5.1 COMMERCIAL VESSEL REPAIR YARD
<pb n="28" />

       Sheltered water area of up to 10 acres with 1.0 foot maximum
         storm wave height.
       Dockside (piers) space for 5 vessels (minimum) - 1,000 to 2,000
         feet in length with 18 to 20 feet alongside.
       Alongside working area for each vessel - 5,000 square feet.
       Ship lift, marine rail, dry dock or graving dock - 1,500 to
         2,500 tons.
       Cranes at dock (15 to 50 tons) and in repair yard (10 to 20
         tons).
       Repair yard, flat with rails or transfer pit to haulout area  5

         to 10 acres.
       Workshops for welding, paint, electrical/electronics, machine
         shops - 6,000 square feet total.
       Administration building, restrooms etc.
       Highway access.
       Parking for 25 to 40 employees and visitors.
       Electricity,, water, and telephone supply.

       ENVIRONMENTAL ASPECTS

       The major environmental constraint to this alternative is the
       need to fill in the productive southern lagoon in order to
       provide the necessary open space for a repair yard and workshop
       area. Other concerns would be for water quality in the area of
       the wet docks where repair work is carried out, noise and local
       resident concerns over night time work, and the presence of
       transient labor or boat crews in the area.

       It is likely that an application for permits to develop the site
       for a commercial shipyard could meet a number of important
       objections from local, state, and federal agencies.         Local
       citizen opposition could be significant.

                                     -13-
<pb n="29" />

                                                  C,@ (:) M IP Y, IF, 7r I C3 DZ Yk IE FC3 Fk r'r

                                        JIEVVIEI:tSC)III.-T c:@C)UWrrN,

                                                    JUNE 1985

                 The preparation of this report was financially aided through a grant (G085016B)
                 from the Washington State Department of Ecology with funds obtained from the
                 United States Department of Commerce, appropriated for Section 306 of the Coastal
                 Zone Management Act of 1972.
<pb n="30" />

                                                  SUMMARY OF

                                          ACCOMPLISHMENTS

                      Two tasks were undertaken during the grant period to aid in the management
                 of the county's shorelines. The completion of the tasks resulted in two

                 published documents.
                      The Port Townsend Waterfront Erosion Control and Shore Enhancement study
                 examines the erosion problems along a portion of Port Townsend's waterfront and
                 discusses restoration solutions. The Study was done by a consultant, Wolf Bauer,
                 P. E., for the City of Port Townsend. The study is described under the abstract.
                      The Marine Industrial Development Options for Glen Cove, A Preliminary
                 Assessment is an analysis of the Glen Cove waterfront area being developed as a
                 terminal for marine-related industries. The study was done by consultants for
                 the Port of Port Townsend, Tipp etts-Abbett-McCarthy-Straton. The Study is

                 described under the abstract.
<pb n="31" />

                                                   ABSTRACT

                 TITLE: Port Townsend Waterfront Erosion Control and Shore Enhancement

                 AUTHOR: Wolf Bauer, P.E., Shore Resource Consultant
                 SUBJECT: The study is on the enhancement of a portion of a waterfront area in
                 Port Townsend.

                 PUBLICATION DATE: June 15, 1985

                 SPONSORS: Washington State Department of Ecology and City of Port Townsend
                 SOURCE OF COPIES: Wolf Bauer, 5622 Seaview Avenue Northwest, Seattle,
                 Washington 98107

                 PROJECT NUMBER: G085016B
                 CONTENTS: Four drawings and four explanatory pages.
                 ABSTRACT: The study is an examination of the cause of erosion of 1.5 mile of
                 shoreline in downtown Port Townsend. These shorelines once were accretion
                 beaches before their feeder material source was cut-off by development. The
                 study includes detailed designs and specifications for the restoration of three
                 sites to accretion beaches.
<pb n="32" />

                                          ABSTRACT

        1: Author:

         Michael G. Horton, TAMS Engineers, Seattle, Washington.

        2: Subject:

         Waterfront Industrial Land Use Assessment - Glen Cove, Port Townsend

        3: Published: June 15, 1985
        4: Sponsors:

         Washington State Department of Ecology and the Port of Port Townsend

        5: Source of Copies:

         Port of Port Townsend,
         2529 Washington Street,
         Port Townsend, WA 98368

        6: WDOE Project No. G 085016 B
        7: Series No.    N/A
        8: Number of Pages 39
        9: ABSTRACT

        The Glen Cove Site, located just outside the southern boundary of the
        city of Port Townsend is a 300 acre area which has been designated
        for industrial use in the Jefferson County Comprehensive Master
        Plan.    The natural slopes over the entire area are relatively steep,
        and access to the water is gained through a paved road known as Ferry
        Street.

        The study is a preliminary investigation of waterfront related
        industrial options for the site.           Demand is briefly discussed in
        order to derive functional requirements for each alternative and
        construction costs are presented. Potential environmental concerns
        form a major part of the analysis.

        The major conclusion of the study is that the topography of the
        uplands and the shallow water depth in Glen Cove are significant
        constraints to the development of industries such as a commercial
        shipyard,   pleasure craft repair yard or marine cargo handling
        terminal.    The only area readily available for medium or large scale
        waterfront industrial use is a freshwater lagoon owned by the Port-
        Townsend Paper Company which was seen to support variout species of
        aquatic birds, wildfowl and small mammals.

        The location of a marina at the site is a long term option when the
        capability to extend the present Port Townsend Boat Haven has been
        exhausted. Dredge and fill requirements in the intertidal zone would
        be significant environmental concerns.

        Developments that appear to be more compatible with the site are a
        fish processing plant or non water related industries based on 5 acre
        parcels.   The site would also be a good location for a boat launch
        ramp.
<pb n="33" />

        CONSTRUCTION COSTS

        Construction costs for a Commercial Ship Repair,Yard at the site

        are:

             ..................................................

                      Description                      Cost

             --------------------------------------------------

             Site Preparation                         1,224,000
             Pier                                     2,420,000
             Marine rail                              1,300,000
             Repair Yard, paving, rails               1,000,000
             workshops, office, restrooms                227,500
             Utilities                                   750,000
             Parking lot, Access, fence                  250,000

             ---------------------------------------------------

                                          Sub total   7,171,500
             Admin, engineering, permit                  645,000
             Contingencies @ 20 percent               1,565,000

             ----------------------------------------------------

             TOTAL                                    $9,381,500

             ----------------------------------------------------

             Note: Y3 =&gt; cubic yard; Y2 =&gt; square yard,
                   F2 =&gt; square foot etc; LS =&gt; Lump sum.
                   LF =&gt; lineal foot

        OVERALL FEASIBILITY

        The site   is not considered to be a particularly good location
        for a medium sized ship repair yard, principally because the
        repair docks should be built alongside the repair yard for
        operational efficiency.      The pier construction shown in Figure
        5.1 is a less efficient compromise dictated by the shallow water
        depths in Glen Cove. Land reclamation below the Mean Low Water
        line was not considered to be an economical means of providing a
        more useful facility layout, since the dredging and fill costs
        are high and permitting difficulties would be a major obstacle.

                                       -14-
<pb n="34" />

        5.1.2: PLEASURE AND SMALL COMMERCIAL BOAT REPAIR

        DEMAND

        Generally, pleasure boat repair facilities will be combined with
        or adjacent to a marina to provide an integrated service to the
        boat owner.       With a predominance of wooden boats in the Port
        Townsend area for repair, weights tend to be higher than found
        at yards in other areas.           A repair yard at Glen Cove would
        therefore expect to handle sailboats and motor boats up to 80
        feet in length with the average haul out being for a 35 to 50
        foot craft weighing less than 60 tons.

        FUNCTIONAL REQUIREMENTS

        The travel hoist or straddle carrier is one of the most common
        lift    vehicles    found    in boat yards since it offers the
        flexibility to both haul and move the vessel around a work area
        at an economic cost. Most units are in the 40 to 80 ton range
        but 150 to 250 ton hoists are occasionally found. Tire loadings
        are, however, extremely high with the larger lifts and concrete
        runways are often needed where soil conditions are less than
        ideal.     A limitation of the travel hoist which particularly
        applies to Glen Cove is the need for a level grade for moving
        boats to and from an open storage area. A 6 percent grade is
        generally accepted as the maximum for lifts running on a paved
        surface, and this is considerably less than the grades at Glen

        Cove.

        In comparison to the significant amount of work done at a wet
        slip for large commercial craft, most maintenance work on
        pleasure craft is more conveniently accomplished out of the
        water.    Dockside requirements are therefore minimal. The scheme
        shown in Figure 5.2 illustrates a typical repair yard for the
        fleet mix currently found in Puget Sound marinas.

                                         -15-
<pb n="35" />

                                      REPAIR/STORAGE
                                      BAYS

                                                       WORKSHOPS/
                                                        BOAT SHEDS

                                                                              PIER FOR
                                                   OFFICE
                                                                              STRADDLE LIFT

                            FUTURE
                            EXPANSION
                                                                        \rl

                                                                                    tv

                        L                J

                                     i r

                     POTENTIAL FOR
                     CAMPING/RV SITE

             0                     500 FEET

                       SCALE

                                              G L E N   C 0 V E   INDUSTRIAL        A N A L Y S I S

                                                 FIG. 5.2 PLEASURE CRAFT REPAIR YARD
<pb n="36" />

       Elements required include:

       Hoist - Straddle carrier (60 to 80 tons) on purpose built pier.
       Water depth 12 to 14 ft at hoist at MLLW.
       Average wave height not more than 0.5 ft.
       Paved, flat access way to repair/storage yard.
       Fenced, secure repair yard 2 to 4 acres.
       Covered storage bays (10 to 15) for boat repair or construction.
       Workshops - 3,000 to 5,000 sq ft.
       Employee/customer parking for 50 vehicles.
       Water, electricity telephone and sewers.

       ENVIRONMENTAL ASPECTS

       The major environmental concern is the loss of the wetlands as
       for the commercial shipyard option.       Other concerns, such as
       noise, traffic, and nuisance level, are not considered to be
       serious   factors since the area is already designated for
       industrial use.

                                     -16-
<pb n="37" />

       CONSTRUCTION COSTS

       Construction costs for a Repair Yard for Pleasure Craft at Glen

       Cove are:

            ------------------------------------------

              DESCRIPTION                        COST

            ------------------------------------------

            site Preparation                   204,000
            Pier for travel hoist             1,650,000
            Travel Hoist (80 ton)              250,000
            Repair Yard                        120,000
            Covered storage                    200,000
            Workshops, office, restrooms       120,000
            Utilities                          150,000
            Parking lot, Access, fence         125,000

            ------------------------------------------

                                Sub total     $2,819,000
            Admin, engineering, permit           300,000
            Contingencies @ 20 percent           600,000

            -------------------------------------------

            TOTAL                             $3,420,000

            -------------------------------------------

       OVERALL FEASIBILITY

       Although    a repair yard handling pleasure boats and small
       commercial    craft   is considered to pose few compatibility
       problems with the surrounding area and property owners, it still
       requires a useful flat parcel of land adjacent to the water.
       Since the natural slopes on Ferry Street are steeper than a
       travel hoist can handle this again means filling in part of the
       lagoon to provide a repair and storage yard this presents
       environmental obstacles to the acquisition of a permit.

       A further detracting element is the separation of the facility
       from the existing commercial center.          Port Townsend, while
       lacking the capacity to haul larger vessels, has considerable

                                       -17-
<pb n="38" />

        area available for expansion and an established infrastructure.
        This   significantly     affects    the   outcome    of    the permit
        applications since it would be difficult to demonstrate that the
        demand could not be accommodated elsewhere with a lesser impact.

        A   major advantage of a yard at Glen Cove might be the
        possibility of providing a RV park or camp site nearby to enable
        boat owners to stay near their boats at low cost during the
        winter or while working on long projects. While this land use
        is not completely compatible with the designated use for the
        area it would address a definite need that the Boat Haven area
        yards are unable to address due to City regulations.

        No major difficulties are seen with utilities or access since
        electrical and water demands are light.

        5.2: PLEASURE BOAT MOORAGE

        5.2.1: DEMAND

        The Port master plan recommends expansion of the existing boat
        haven to accommodate future demand for pleasure craft moorage.
        This would be accomplished in the short te     rm by reorientation of
        the floats and later by expansion and dredging to the west.
        Increased participation in Point Hudson was also recommended.

        In fact, the high level of demand for additional slips in
        Jefferson County and Puget Sound originally forecasted by the
        Corps of Engineers (1980) and others has not yet materialized
        and the current Boat Haven waiting list could be accommodated by
        the addition of 50 new slips in the existing basin. The Old
        Alcohol Plant marina at Hadlock is also being expanded, and
        therefore there is unlikely to be any severe pressure for a
        completely new facility at Glen Cove within the next 10 to 15

        years.

                                        -18-
<pb n="39" />

       5.2.2: FUNCTIONAL REQUIREMENTS

       Based upon current trends, construction costs, and moorage
       revenues, any new purpose built marina will require on the order
       of 500 slips in order to be economically feasible (this assumes
       that a major breakwater would be required) together with up to
       30 acres of upland facilities and parking as shown in Figure
       5.3.    Functional requirements for such a facility at Glen Cove

       are:

        Breakwater, vertical wall or rubble mound - 2,100 ft long.
        Permanent (400) and transient floats 3,000 lineal ft.
        Water depth in basin 10 to 18 ft at MLLW.
        open area for concessions, yacht club etc - 4 acres.
        Space for residential or condominium development (to assist
        project financing)   10 to 20 acres.
        open parking area   400 cars - 5 acres.
        Restrooms, showers, office, shop.
        Public and private telephones.
        Holding tank disposal, sewers, electricity to floats and
        landside, area lighting.
        Fire protection system.
        Fuel storage and supply float.
        Boat haul out, marine rail or hoist (optional)
        Tidal grid.
        Launch ramp ( optional)

                                    -19-
<pb n="40" />

                                                                               N-F

                                                                                  RUBBLE MOUND
                                                LAUNCH RAMP
                                                                                  BREAKWATER

                                                    FUEL    TRANSIENT
                  UPLAND                            DOCK    MOORAGE
                  DEVELOPMENT   U)                                              FLOATS FOR
                                Lu                                                  500 BOATS

                                                                                       DREDGE BASIN
                                                                                       TO -14.00/-18.00

                                         N
                                                     0

                                                         0-
                                                                                COVERED
                                                                                 SLIPS

                                           FILL FROM
                                           DREDGE SPOILS

              0             500           1000 FEET

                            SCALE

                                            G L E N   C 0 V E  INDUSTRIAL         A N A L Y S I S

                                                           FIG. 5.3 MARINA
<pb n="41" />

        5.2.3: CONSTRUCTION COSTS

        Costs for a marina at Glen Cove are:

             ----------------------------------------

                DESCRIPTION                      COST

             ----------------------------------------

             Uplands Preparation               100,000
             Dredging                          750,000
             Breakwater                      3,750,000

             Floats                          3,000,000
             Ramp or Hoist                     150tooo
             Fuel float, grid                    50,000
             office, restrooms, showers          67,500
             Utilities                         100,000
             Parking, security                   50,000

             -----------------------------------------

                             Sub total       $8,017,500
             Admin, engineering, permit      1,200,000
             Contingencies @ 20 percent      1,843,500

             -----------------------------------------

             TOTAL                          $11,061,000

             -----                          -----------

        5.2.4: OVERALL FEASIBILITY

        The capital construction cost of a new marina at Glen Cove is
        seen above to be on the order of $11 million or equivalent to
        $22,000 per slip (excluding land acquisition).           In order to
        recover the expenditure over 20 year period, revenues of up to
        $7.00 per foot would be needed, over double the current average
        rate for existing marinas in Jefferson and Clallam Counties.
        Many authorities and private developers, such as the Port of
        Seattle and developers in Anacortes are now looking to uplands
        development   as    a means to assist with financing moorage
        construction. While this approach might be viable at Glen Cove
        for industrial development it would not work for pleasure or
        commercial options such as condominium development, a shopping

                                        -20-
<pb n="42" />

       mall or convention center since it would not only conflict with
       the designated use but the site is also too far removed from the
       downtown area and main tourism destinations. The presence of
       the Mill is a further deterrent to residential or commercial use

       of the area.

       Given the demand limitations, and potential difficulties in
       incorporating "spin off" development in the overall marina
       package, the Use of Glen Cove for a large marina is considered
       to be unlikely.

       5.2.5: ENVIRONMENTAL ISSUES

       Marina    development    proposals    are   often    the subject of
       considerable objection by public agencies and citizen groups and
       the loss of the beach habitats and lagoon at Glen Cove would
       require     considerable    mitigation    measures    before     Corps,
       Shorelines, and Hydraulics permits could be obtained. Although
       pleasure boat development in the area might be considered to be
       more palatable than the construction of industrial facilities,
       the impact of the large enclosed water area and breakwater is
       likely to be a source of concern to a number of agencies.

       5.3: DRY STORAGE MARINA

       5.3.1: DEMAND

       Dry storage of boats is a popular alternative to a full fledged
       marina    in highly developed residential areas with limited
       parking space or where wet moorage is at a premium. It offers
       relatively cheap storage for trailerable size boats and an owner
       does not need to be concerned with regularly checking his boat
       for leakage etc.        It is not so applicable to rural areas or
       residential areas with a predominance of single family homes
       since it is much cheaper and almost as convenient as the dry
       storage option.

                                        -21-
<pb n="43" />

       It is however, considered to be a valid alternative for this
       study since it eliminates a number of the cost and environmental
       difficulties expected with a marina development.

       5.3.2: FUNCTIONAL REQUIREMENTS

       The dry storage concept is primarily applicable to motor boats
       of less than 25 feet but sailboats and larger craft are often

       handled.

       A large modified fork lift truck or similar device picks the
       boat out of the water at a special ramp and stores it either in
       a covered rack type building with up to 3 levels or on blocks or
       cradles in an open storage area. Boat owners wishing to use
       their boats call in advance and the craft is placed in the water
       at a short term float to await their arrival. The system is
       efficient, economic on water space and easier from a permitting
       standpoint.       However   many    boat owners, particularly of
       sailboats, are    reluctant to allow their boats to be removed and
       placed in the     water so frequently, fearing hull damage or
       distortion.

       A typical layout for a facility capable of storing 150 boats
       under cover and 300 in an open yard is shown in Figure 5.4.
       Functional requirements for the scheme shown are:

       Ramp - slope 12.5 to 15 percent grade and 100 to 150 ft wide.
       Lift machines - 25 ton capacity, 15 ft height capability
           2 or 3 units
       Storage building three levels 10,000 sq ft. (150 boats).
       open yard 3 to 5 acres.
       Workshop, machine shops etc.
       Customer parking for 250 cars.
       Telephone, electricity, water, sewer.
       Restrooms, showers office and shop.

                                       -22-
<pb n="44" />

                                                                                       4op

                                                         Alo

                WORKSHOP   BOATSTORAGE
                           Ik         I                                     HOLDING FLOAT

                BUILDING AND
                OFFICE

                                              LAUNCH
                                              RECOVERY RAMP

                           PTPC ACCESS

              0                   500 FEET

                        SCALE

                                          G L E N  C 0 V E  INDUSTRIAL      A N A L Y S I S

                                                  FIG. 5.4 DRY STORAGE YARD
<pb n="45" />

        5.3.3: ENVIRONMENTAL FACTORS

        The concept presents few environmental problems and little
        impact on the area apart from the need to fill in the south
        lagoon wetlands and reclaim a strip of land along the shoreline
        for the ramp and holding pier.

        5.3.4: CONSTRUCTION COSTS

        Costs for a Dry Storage Facility at the site are:

             -----------------------------------------

              DESCRIPTION                        COST

              -----------                        ----

             Uplands Preparation               400,000
             Ramp and holding Float            750,000
             Lift Trucks                       900,000
             Open Storage Yard                 250,000
             Covered storage building          300,000
             office, restrooms, showers          67,500
             utilities                         100,000
             Parking, security                   75,000

             -----------------------------------------

                          Sub total           2,842,500
             Admin, engineering, permit        342,000
             Contingencies @ 20 percent        640,000

             -----------------------------------------

             TOTAL                           $3,824,500

             -----------------------------------------

        5.3.5: OVERALL FEASIBILITY

        Although compatible with land use designations for the area and
        relatively   cost effective, the dry marina concept is not
        considered applicable to Port Townsend. Given the character and
        attraction of the region with its emphasis on preservation, it
        is also most unlikely that conditions favorable to economics of
        a dry marina will occur in the future.

                                       -23-
<pb n="46" />

           5.4: FISHERIES

           5.4.1: FISH PROCESSING PLANT

           DEMAND

           As public awareness of the nutritional and health value of fresh
           fish products continues to grow, the Pacific Northwest bottom
           fishery   is also growing and supplementing the traditional
           salmon, shellfish and Dungeness crab fisheries. Sea farming and
           aquaculture projects are also becoming more common in the
           Pacific   Northwest.     Although 1980s projections (Washington
           Public Ports Study) of over 20 new shorebased processing plants
           in the Puget Sound are unlikely to be achieved, it is expected
           that a number of new plants will be established in the region in
           the next 5 to 10 years. A plant at Glen Cove would serve the
           immediate   Port Townsend and East Jefferson County and as
           production grew, product could be trucked to Seattle to link in
           to the main domestic distribution channels.

           A major advantage for Port Townsend is the reduced sailing
           distance from the plant to the fishing ground, cutting a day off
           the trip time when compared with Seattle.

           FUNCTIONAL REQUIREMENTS

           A new shore based fish processing facility will include an
           unloading   dock, coldstore and central processing facility.
           Although the facility does not require flat land, it should be
           as close to the water as possible. Many also include fish meal
           and waste processing plants to meet discharge water quality
           requirements.    A typical plant capable of processing 120,000 lbs
           of bottom fish per day with a work force of 50,, will require:

           Unloading/loading dock  .... 300-500 ft and 16-18 ft deep at MLLW
           Land ....................... 3 to 5 acres

           Cold store..... ............  60,000 to 100,000 cu ft
           Freezer unit ..............   10,000 cu ft

                                          -24-
<pb n="47" />

                      FERRY STREET               oo            FISH DOCK
                                                                                   &lt;;

                    INTERNAL ACCESS ROAD

                                                 Lu

                  w

               w
               LL
               w
               w                                 &lt;
                  (n                             w

                  &lt;                              0
                  &gt;                              i@
                                                 v     0

         PROCESSING PLANT/COLDSTORE/

               FREEZER/OFFICE

         0                         500 FEET

                    SCALE
                                                    (FIS

                                             G L E N   C 0 V E  INDUSTRIAL        A N A L Y S I S

                                                 FIG. 5.5 FISH PROCESSING FACILITY
<pb n="48" />

           Filleting/processing line
           Waste disposal, processor or fish meal plant
           Water service up to 75,000 gallons per day
           Electricity, telephone, sewers
           Fuel facility for fishing vessels (optional)
           Chandlery (optional)
           Dormitory or rest facilities (optional)
           Reefer van storage and truck load out area (25 to 50 40 ft vans)
           Employee parking
           Gear Storage and net repair .... up to 5 acres (optional)
           Moorage for fishing vessels

           CONSTRUCTION COSTS

           Construction Costs for a typical Bottom Fish Processing Plant

           are:

                -------------------------------------------

                 DESCRIPTION                         COST

                -------------------------------------------

                site Preparation                    40,000
                unloading Pier                      650,000
                Vacuum Pump, hoists etc             170,000
                Reefer yard                         50,000
                Processing Plant                    360,000
                Cold store and freezer              375,000
                Cafeteria, workshops, office,       160,000
                Utilities, waste disposal           350,000
                Employee Parking, Access            75,000

                -------------------------------------------

                             Sub total            2,230,000
                Admin, engineering, permit          200,000
                Contingencies  @ 20 percent         486,000

                ------------- - -- -------          -------

                TOTAL                            $2,916,000

                -------------------------------------------

                     Equipment excluded from costs

                                           -25-
<pb n="49" />

           ENVIRONMENTAL FACTORS

           The main environmental concern over a fish processing plant will
           be the treatment and discharge requirements for waste products.
           Screening and treatment will be required for potentially large
           volumes of waste water and solids will require hauling off site
           or incineration.       Care would be necessary to prevent any water
           quality deterioration that might affect the proposed aquaculture
           project.

           Since the uplands area is located away from the lagoon wetlands
           there are no problems with fill and impacts on the surrounding
           area are not significant.          An open piled unloading pier fits
           Dept of Fisheries Hydraulic permit guidelines and the project
           would cause only very minor loss of intertidal habitat.

           OVERALL FEASIBILITY

           The establishment of a small fish dock and processing facility
           at Glen Cove is compatible with the designated use of the site
           and environmental limitations are minimal. The feasibility of
           the option appears to be hopeful and the level of business of
           the existing plant in the City is steadily growing.

           A fish processing plant is therefore considered to be one of the
           favored development options for the site.

           5.4.2: AQUACULTURE

           The number of salmon rearing or farming projects in Washington
           is increasing with facilities recently constructed in Port
           Angeles and Crane Point off Indian Island. Plans to locate a
           series of pens to the south of Glen Cove are already in the
           permitting process and no major concerns have been expressed to
           date.    Several other fish farming operations are proposed in the
           County and are currently under review.             The development is
           compatible with the designated use of the area and in fact

                                            -26-
<pb n="50" />

          requires very little land, except for access. Since the site is
          selected principally for the high water quality and moderate
          currents, any adjacent future development should not cause a
          deterioration of the water in the area.

          5.5: MARINE TERMINAL

          5.5.1: FERRY TERMINAL

          An increase in ferry traffic to Port Townsend is likely to
          result from the development of the Point Hudson area as a
          festival and convention center, the increasing attractiveness of
          the downtown district as a tourist destination, the proposed
          catamaran ferry service to Seattle and the possible stopover by
          the new hydrofoil on the Seattle - Victoria run.

          The new state ferry terminal adequately addresses the need for
          vehicular service and any new passenger only service would also
          choose a downtown location as a first choice. Development of a
          terminal at Glen Cove is therefore most unlikely.

          5.5.2: GENERAL CARGO TERMINAL

          DEMAND

          With the demise of the Seattle and North Coast Railroad, the
          only general cargo terminal in the area is owned and privately
          operated by the Port Townsend Paper Company. Their dock is used
          for loading pulp and paper products and the receipt of wood
          chips from barges moored in the Glen Cove area.

          The establishment of a barge feeder service from the area to
          lower Puget Sound has been the subject of discussion since the
          closure of the railroad facility. Containers could be loaded
          onto a barge for transfer to shipside or railroad cars in
          Seattle or Tacoma and take advantage of the economies of
          interfacing to a large load center.

                                        -27-
<pb n="51" />

           However, one of the main reasons for the railroad's failure was
           the impact of reduced truck haul costs following deregulation of
           the trucking industry. The cost of barging a container from the
           Port Townsend area to Seattle (assuming recovery of construction
           and operating costs) is likely to be on the order of $300 to
           $350, compared with $200 to $275 by road. This gap is unlikely
           to close in the near future as truckers are meeting increased
           competition by improved productivity and larger load capacities.

           In the past, the railroad carried sufficient timber products to
           enable it to compete with a regulated trucking industry. The
           regional economy has become much more service based in recent
           years,    as evidenced by the increasing median age of the
           population as the timber business has declined. This has caused
           a centralizing of ship bound peninsula log exports from Port
           Angeles    and   very    little lumber now moves by waterborne
           transport.

           A reopening of the mills in the future is expected but demand
           will almost certainly be domestic and again the truck haul from
           Port Townsend to lower Puget Sound or the main rail routes will
           be more economic than a barge system.

           It should be noted that regional government entities are in the
           process of negotiating the acquisition of the railroad between
           Port Townsend and Port Angeles. A short line operation using
           the existing pier and transfer span has been determined to be
           economically feasible and competitive.

           FUNCTIONAL REQUIREMENTS

           In the event that a strong demand was established for a barge
           dock in the Port Townsend area, the Glen Cove offers a potential
           location for the loading pier, access trestle and back up          area
           for a modest general cargo operation shown in Figure 5.6.

           Functional requirements for a terminal capable of handling 200
           foot dry cargo barges (5000 tons) are:

                                           -28-
<pb n="52" />

                     N

            \Nit\
                Vr

                                        OPEN STORAGE
                  CONTAINER'a
                   FREIGHT
                   STATION            OPEN
                                    STORAGE

                               GATEHOUSE/
                                OFFICE                                                TUG      200,
                                                         ACCESS TR S E                       BARGE
                                                                 E TL                   :&gt; E@@
                                                                                   MARSHALLING AREA
                         VEHICLE HOLDING                                               400, BARGE

                              AREA

                     C:&gt;
                      c

            0                    500 FEET

                     SCALE

                                              G L E N  C 0 V E   I N D U S T R I A LA N A L Y S I S

                                                      FIG. 5.6 BARGE TERMINAL
<pb n="53" />

              Water depth   ......... o.s.,*20 ft at Mean Low Water
              Maximum wave for loading. 0.75 to 1.0 ft
              Length of dock   ............  500 ft (2 barges or I plus tug)
              Back up storage area    ...... 10 to 20 acres
              Equipment......    .....o .... Mobile or fixed crane (40 tons)
                           ................  Fork lift trucks ( 15 and 40 tons)

                                      .... .,Trailers
              Acces s..........  ***..o*  ... Truck access (32 ft width)
              Truck holding area .... o   ... 2 to 3 acres
              Weighbridge (optional)
              Buildings...  ......  ***  ..... Warehouse/container freight station
                                             (6000 sq ft)
              Utilities  ....... o ... ......Water (low), fire water
                                           ..Electricity (2 and 3 phase supply)
                                           ..Telephone (5 lines)

             ENVIRONMENTAL IMPACT

             The major impact associated with the construction of a barge
             dock at the site will be the demands on the local road system of
             large trucks and trailers. Additionally the large wetlands fill
             requirement at the South lagoon would cause state and local
             agencies considerable concerns. As for almost all developments,
             sewer system needs are also a problem.

                                                -29-
<pb n="54" />

        CONSTRUCTION COSTS

             Construction Costs - Barge Feeder Service Terminal

             -------------------------------------------

               DESCRIPTION                       COST

             -------------------------------------------

             Uplands preparation               1,000,000
             open piled cargo dock             1,440,000
             Access pier                       lr625,000
             open storage yard                   750,000
             Container Freight Station           180,000
             office, maintenance shop              45,000
             Utilities                           100,000
             Parking, truck holding area           75,000

             --------------------------------------------

                             Sub total         5,215,000
             Admin, engineering, permit          625,000
             Contingencies @ 20 percent        1,200,000

             --------------------------------------------

             TOTAL                             $7,040,000

             --------------------------------------------

        OVERALL FEASIBILITY

        It is doubtful that Eastern Jefferson County could generate
        enough cargo within the next 10 years to support a new barge
        terminal at Glen Cove.         Much more probable might be the
        reconstruction of the existing Railroad pier at the Boat Haven
        to handle containers with much less impact on wetlands areas and
        the intertidal habitat.

        A further deterrent to the Glen Cove site is the shallow inshore
        depth in the cove.        While a dredge and fill solution might
        create a marginal type wharf alongside a reclaimed open storage
        area, costs would double and the procurement of the necessary
        permits would be extremely difficult.

                                        -30-
<pb n="55" />

       5.6: OIL RELATED INDUSTRIES

       5.6.1: OIL RIG PLATFORMS

       A number of companies have investigated the Puget Sound area as
       a location for the construction of oil rigs for North Alaskan
       exploration and petroleum production wells.        The units are
       either steel or concrete structures which are assembled at yards
       adjacent to deep water and then towed, usually as a complete
       unit, to the well location. Since most rigs sit on the sea bed
       in up to 80 feet of water, the depth required for towing often
       is as much as 100 feet.         Rigs are also towed on barges and
       tilted into position, requiring 40 to 50 feet of water for the
       initial launch.

       Functional requirements for a rig fabrication yard vary with the
       type of rig to be constructed but an all purpose yard will
       require the following:

       Access to deep water - 100 ft preferred at launch site.
       Sheltered anchorage to hold rig and complete final assembly

         process.
       Good soils for support of marine ways or launch ramps.
       Work yard up to 25 acres, flat and adjacent to water.
       Highway access with mild slopes and few curves for large trucks.
       Parking for 500 to 800 workers (peak).- 2.5 to 5 acres.
       Assembly, welding and misc workshops - up to 200,000 sq ft

         total.

       Cafeteria and rest rooms for workers
       Local accommodation for temporary workers.
       Electricity - 2 and 3 phase supply -
       Telephone.

       Sewers.
       Water supply (20 to 25,000 gals per day).

                                      -31-
<pb n="56" />

        The Glen Cove site offers few advantages for a rig fabrication
        yard.    It has little flat land without filling the entire south
        lagoon, the cove is too shallow for a deepwater rig and local
        objections to a sudden influx of almost 1,000 workers is likely

        to be intense.

        5.6.2: NORTH SLOPE MODULES

        The construction of modules for the North Slope of Alaska and
        the Canadian Beaufort sea is likely to continue for at least the
        next   10   years,     Complete buildings, with all machinery,
        utilities, and fittings are assembled in Tacoma and Everett for
        barging up to the oil fields once a year when the arctic ice
        retreats for a few weeks in late July. Requirements for a
        module fabrication and assembly yard are similar to those
        described above with the exception that the completed units are
        moved onto large barges over a dock or concrete apron by special
        jack up trailers. While marine side requirements such as water
        depth are less severe than for oil platform launching, a
        sheltered location is critical to the complicated and delicate
        launch process.      Additionally the time window for barging the
        units to the Arctic is extremely short and weather delays at
        launch time could cause the failure of the entire operation.

        A typical yard will require the following:

        Water depth - 35 to 40 ft at launch site.
        Sheltered anchorage for module loadout.
        Good soils for support of module.
        Bulkhead, dock or apron with 30 to 35 ft depth alongside.
        Work and materials storage yard up to 25 acres, flat and within
          1000 ft of load out area,
        Highway access with mild slopes and few curves for large trucks.
        Parking for 250 to 600 workers (peak).- 2.0 to 4 acres.
        Assembly, welding and misc workshops - up to 200,000 sq ft
          total.

        Cafeteria and rest rooms for workers

                                        -32-
<pb n="57" />

        Local accommodation for temporary workers.
        Electricity - 2 and 3 phase supply.
        Telephone.

        Sewers.
        Water supply (20 to 25,000 gals per day).

        The environmental problems associated with a module fabrication
        yard are a little less than for the rig assembly yard since
        almost no work is done on the water. However, the wetlands fill
        issue is critical and local objections to the increased employee
        population would be equally strong.        The provision of an
        adequate sewer system would also be expensive.

        It is not therefore considered that the Glen Cove site would be
        attractive to potential developers of a yard in the Port

        Townsend area.

        5.7: BOAT LAUNCH FACILITY

        5.7.1: DEMAND

        While not strictly an industrial use, the provision of a small
        boat launch ramp at Glen Cove would fit in with an industrial
        park development and also raise few environmental issues.

        It appears that there are never enough boat launch ramps in
        Jefferson and Clallam counties in the summer months.            An
        additional facility at the site would relieve pressures on the
        downtown area for trailer storage and parking.

        Although an area reserved for RV parking and hook up might add
        to the attraction of the area, it could be considered a non-
        compatible use of the site.

                                      -33-
<pb n="58" />

                                                                                rn

                                                                                M
                                                                                c  m
                                                                                0

                                                                    OPTIONAL

                                                                   RV PARKING/            m

                                                                    CAMPSITE/

                                                                 ADO'L TRAILERS           cn
                            &gt;                                                             --i
                            r-                                                            rn
                            m                   m                                         m

                                                m             TRAILER PARKING
                                                C)                              F7-M

                                  cn
                                                03                  RESTROOMS

                                  -n
                                  m
                  c)              m
                  r-              -4
                                                                   RIGGING/
             -n   m                                               DERIGGING
                  z                                        C77
                                                                                                      q ccr--Ss
                                                                                                             7`0 P7-pc
                  0
                  &lt;
             W    m

             &gt;

             r-   z
             00
             C)   c
             &gt;

             c    &gt;                                                                          &gt;
             z    r

                  &gt;

                  93
                                                  ff
                                                                    OPTIO N @A
                                                                   RV PARKIN  G/

                                                                      Mp IT
                                                                 @ @CA     EL
                                                                        S
                                                                    O'L TRAILE@S
                                                        @_T R A    LERSPA@K-ING@
                                                                       TROOMS
                                                                  @RE
<pb n="59" />

          5.7.2: FUNCTIONAL REQUIREMENTS

          The facility shown in Figure 5.7 would handle an average of 160
          launches (=160 in and 160 out) on a peak day or up to 12,000
          launches a year. Functional requirements are:

           Four lane launch ramp with one float per 2 lanes.
           Parking for 200 cars and trailers - 3 to 4 acres.

           Rest room.

           Water for wash down.
           Public telephone, electricity.

          5.7.3: ENVIRONMENTAL FACTORS

          The wetlands fill issues associated with the southern lagoon are
          avoided by terracing the area to the south of the Frederick
          street right of way at the beach.

          The construction of the ramp         will cause    a minor loss of
          intertidal    habitat    but    this is not expected to warrant
          mitigation on a large scale.         other concerns will include run
          off from the parking areas and drain field location for the

          restrooms.

          5.7.4: OVERALL FEASIBILITY

          Although it falls outside the scope of industrial development, a
          boat launch ramp fits in well with the characteristics of the
          site.    The construction of the ramp would also facilitate an
          extension of the existing repair business adjacent to the beach
          and   could    serve    as   a    catalyst    for more development.
          Unfortunately boat launch ramps generate little, if any revenues
          and therefore sponsorship of construction would almost certainly
          be a major obstacle.

                                           -34-
<pb n="60" />

         6: SUMMARY

         The Glen Cove site presents a number of significant constraints
         to large or medium scale marine or waterfront related industrial
         development.

         Probably the most significant limitation is the lack of readily
         developable flat land in parcels larger than 5 to 10 acres.
         Although a number of industrial options, such as a marine repair
         facility, will require less than 10 acres at the outset, future
         expansion potential must be considered and a 20 acre developable
         parcel is considered a minimum requirement.

         This lack of available usable waterfront land then directs

         attention to the south lagoon of the Port Townsend Paper Kraft
         Company,     Although the formation of the lagoon was partly man
         made it is now an important habitat for waterfowl, small marine
         mammals and a variety of wildlife. Any application to fill in
         the   wetland    area to create an industrial park, although
         compatible with local land use comprehensive plan designations,
         would certainly meet strong opposition from county, state, and
         federal agencies.

         The shallow water depth in the cove is a restriction on
         developments such as a general cargo terminal, oil rig platform
         assembly yard and a large vessel ship repair facility. Dredging
         is not considered be a viable means of attaining the required
         depths, since the littoral patterns point to an accumulation
         zone at the site.

         Other development constraints are less significant but detract
         from the attractiveness of the area for large scale development.
         These include the need for a complete sewer system and possible
         treatment plant and the limitation of the entry roads for high
         volume traffic or heavy trucks.

                                         -35-
<pb n="61" />

        Any loss of the intertidal habitat and sand beach will require
        mitigation by replacement of lost areas or extremely strong
        justification before County, State, and Corps permits could be
        issued.     This would be a strong impediment to development of
        pleasure boat moorage or any extensive shoreside construction
        since it would be difficult to reply to arguments that demand
        could be accommodated in the Boat Haven area, in accordance with
        the   recommendations of the adopted Port of Port Townsend
        Comprehensive Plan.

        As shown in the accompanying table overleaf, the most favored
        forms of water depend   ent development for the area are those that
        occupy a minimum length of shoreline and also do not require
        immediate adjacency to the waterfro       nt for back up land. In
        order of apparent overall feasibility these are:

          1.    A fish processing plant (Limited scale operation - no
                long term moorage)
          2.    Pleasure boat repair on a small scale (Limited storage
                for haul outs).
          3.    A marine rail or graving dock for large commercial boat
                repair.

        and although not an industrial development - A small boat ramp
        and parking area would fit well with the site characteristics.

        Although the main conclusion of the study is that the site
        offers little attraction to large scale waterfront development,
        it does appear to have a lot to offer as a general industrial
        park.     The sloping wooded basin could be subdivided into 3 to 5
        acre plots with interesting views on the water and quick access
        to the City.      Development of the fish processing plant and the
        aquaculture project both fit in to this scenario.

                                         -36-
<pb n="62" />

       A road and utilities network running parallel to the natural
       site contours.    With access to the beach, walking and jogging
       trails and some minimal beachside recreational facilities, Glen
       Cove could become an attractive and active industrial/business
       park.

                                    -37-
<pb n="63" />

                                             Industrial Development options - Comparison

                                                                    Compatibility
               Development                         Environmental      with site.         utility     Construction
               Alternative                Demand     Impact        Uplands Marine        Concerns        Cost

            Commercial Vessel            moderate    moderate       poor      moderate     moderate       $9.84
            Repair Yard

            Pleasure Boat Repair         moderate    moderate       fair      good         minimal        $3.42

            Pleasure Boat Moorage        moderate    severe         good      good         moderate       $11.06

            Dry Storage Facility         low         moderate       fair      good         moderate       $3.82

            Fish Processing Plant        moderate    minimal to     good      good         waste/sewers   $2.92
                                         to high     moderate

            Aquaculture Projects         moderate    minimal        good      good         minimal        not priced
                                         to high

            Barge Terminal               low         moderate       poor      poor         moderate       $7.04

            oil Platform Yard            moderate    high           poor      poor         sewer          not priced

            North Slope Modules          declining   high           poor      fair         sewer          not priced

            Boat Launch Facility         fair        minimal        good      good         mimimal        not priced
<pb n="64" />

                                    REFERENCES

        Telephone conversations with:

         Juan De  Valier   - Port Townsend Paper Company
         Scott Flickenger  - Fresh Fish Market.
         Phil Kauzloric    - Wa Dept of Fisheries
         Alan Moore        - Wa Dept of Ecology
         Mary Schroeder    - Port Townsend Paper Company
         Gerald Thorsen    - Dept of Natural Resources

        Interviews with:

         Mark Burn         - Port Townsend Boat Works.
         David Goldsmith   - Jefferson County Planning Dept.
         Gail Gunderson    - Jefferson County EDC.
         Dick Kint         - P. U. D.

         Bob Leach         - Port of Port Townsend
         Casey McKinney    - Admiral Marine.
         Mitchell Press    - Jefferson County Planning Dept.
         George Yount      - Port of Port Townsend

        Reports:

        Port Systems study for The State of Washington (1980)
        CH2MHill
        Recreational    Small   Boat Moorage Study (1980)          Corps of
        Engineers
        Glen Cove Water Supply Feasibility Study (1982)            Hosey and
        Associates
        Comprehensive Plan for the Port of Port Townsend (1981) - Reid
        Middleton

        Shoreline Management Master Program for Jefferson County and
        Port Townsend (1983) - Jefferson County Planning Dept.
        Jefferson County Comprehensive Plan (1979) - Jefferson County
        Planning Dept.

                                        -38-