[From the U.S. Government Printing Office, www.gpo.gov]
CITY OF WASHINGTON LAND DEVELOPMENT PLAN MAY 1976 J,pf-,rnTAKElN BY THE CITY OF WASHINGTON IN CONFORMANCE WITH THE @.AROLINA COASTAL MANAGEMENT ACT OF 1974. 211 XV2 VV37 ."The preparation of this report was financially assisted by a grant from the State of North Carolina, the National-Oceanic and Atmospheric Administration, and the Coastal Plains Regional Commission." WASHINGTON LAND USE PLAN AS MANDATED BY STATE GUIDELINES FOR LOCAL PLANNING IN THE.COASTAL AREA UNDER THE COASTAL AREA MANAGEMENT ACT OF 1974 IF U DEPARTMENT OF COMMERCE NOAA COASTAL SERVICES CENTER 2234 SOUTH HOEFSON AVENUE CHARLEFTON -OC 29405-2413 MAY 21, 1976 WASHING70N CW LAND USE PLAN Washington, North Carolina. March 21, 1976- Prepared By WASHINGTON PLANNING BOARD James P. Blanton, Chairman Blake C. Lewis, Jr.., Vice Chairman William Roach Leon Randolph, Jr. William Lurvey Thomas E. Umphlett Thomas M. Singleton, Jr. Henry C. Humphreys Judy Hayes George C. Bailey For THE'CITIZENS OF WASHINGTON To Be Implemented By WASHINGTON CITY COUNCIL Richard Tripp, Mayor Louis T. Randolph, Mayor Pro Tem A. N, Sawyer Carlotta Mordecai, Joe Hickmdn PROJECT STAFF George L. Nichols, Project Planner Marian Alligood, Secretary Debra Ingalls, Secretary Patricia'Sheppard, Secretary Danny Smith, Draftsman TABLE OF CONTENTS PAGE Introduction 1 Purpose of the plan, history of CAMA planning effort, etc. .3 Description of Present Conditions 17 A. Population and Economy (brief-analy8is) 18 B. Existing Land Use 1. Legible map of existing land uses 33 2. Analysis 34 a. significant compatibility problems 41 b. problems from unpl:anned,development with implica- tions for future land use 41 C. areas experiencing or likely to experience major land use change 43 C., Current Plans, Policies, and Regulations 47 Plans and Policies 48 a. transportation plans 48 b. community facilities plans 52 C. utilities extension policies 52 d. open space policies 53 e. recreation policies 53 f. prior land use plans 53 g. prior land use policies 55 2. Local Regulations 5S a. zoning ordinances 55 b. subdivision regulations 55 C. floodway ordinances 57 d. building codes 59 e. septic tank regulations 60 f. historic districts regulations 60 g. nuisance regulations 60 h. dune protection ordinances 61 i . sedimentation codes 61 j. environmental impact statement ordinances 61 3. Federal and State Regulations 62 Public Participation Activities .66 A. Identification and analysis of major land use issues 67 1. The impact of population and economic trends 7S 2. The provision of adequate housing and other services 76 3. The conservation of productive natural resources 76 4@. The protection of important natural environments 76 5. The protection of cultural and historic resources 77 B.. Alternatives considered in the development of the objectives, policies, and standards. 78 C. Land use objectives, policies and standards for dealing with each identified major issue. 68-74 D. A brief description of the process used to determine 79 objectives, policies and standards, emphasizing public participation E. A detailed statement outlining the.methods employed in securing public participation, and the degree of participation achieved and the results obtained 80 IV. Constraints 82 A. Land Potential 83 1. Physical Limitations 83 a. hazard areas 83 b. soil limitations 88 C. water supply areas .98 d. steep slopes 98 2. Fragile Areas 98 a. coastal wetlands 98 b. outer banks sand dunes 98 c. ocean beaches and shorelines 98 d. estuarine waters 98 e. public trust waters 101 f. complex natural areas 101 g. areas sustaining remnant species 101 h. areas containing unique geologic formations 103 i. registered natural landmarks 103 3- archeologic and historic sites 103 3. Areas with Resource Potential 103 a. productive agricultural lands 103 b. potentially valuable mineral sites 103 C. publicly-owned lands and other non-intensive .109 outdoor recreation lands d. privately-owned wildlife sanctuaries 104 B. Capacity of Community Facilities 105 1. Identification of existing water and sewer service areas 105 2. Design capacity of existing water treatment plant, sewer treatment plant, schools, and primary roads 107 3. The percent utilization of water and sewer plants, schools, and primary roads 108 V. Estimated Demand 122 A. Population and Economy 123 1. Population 123 'a. ten-year population projection 123 b. considerations taken into account in preparing ten-year projection (seasonal populations, local objectives, social and economic charfge) 123 C. 5, 10, 25, and 50 year projections 124 d. relationship of long-term projections to desires of the people 124 e. relationship of the capabilities of the land 13S f. examination of seasonal population and economic impacts 124 2. Economy 128 Identification of major trends and factors in economy B. Future Land Needs 129 Use of the ten-year population projection to determine land demand for land classification C. Community Facilities Demand 131 1. Ten-year population projection used to determin .e facilities demand 2. Consideration of the type and cost of services needed to accommodate projected population 3. Consideration of the ability of the local economy to finance service expansion VI. Plan Description 138 A. Description of the Land Classification System 140 B. Projected population growth allocation to Transition, Community, and Rural Land classes, based upon local objectives C. Gross.population densities used to allocate Transition and Community classifications- 143 D. A legible Land Classification Map which is.consistent with local objectives, policies and standards 139 VII. Areas of Environmental Concern 14S VIII. Summary .151 A. Discussion of the manner of data assembly, analysis, and, a statement of major conclusions IS2 B. Discussion of the application of the data to the plan's formulation 159 Ix. City-County Plan Relationship Defined 160 X Appendix 163-A A. Stream classification 164-A LIST OF TABLES ale Nmber Description Page 1 'POPULATION TRENDS) BEAUFORT COUNTY, 1900-1970 20 2 POPULATION TRENDS, CITY OF WASHINGTON@ 1900-1970 21 3 POPULATION CHANGE BY AGE GROUP AND RACE, CITY OF WASHINGTON, 1960-1970 22 4 POPULATION CHANGE BY AGE.GROUPS, SEX AND RACE: 1950-1960, CITY OF WASHINGTON 23 5 POPULATION CHANGE BY AGE GROUPS, SEX AND RACE: CITY OF WASHINGTON, 1960-1970 24 6 YEARS OF SCHOOL COMPLETED, CITY OF WASHINGTON, 1960 and 1970 25 7 CHANGE IN OCCUPATIONAL CATEGORIES, CITY OF WASHINGTON, 1970 26 8 INDUSTRIAL COMPOSITION, CITY OF WASHINGTON, 1960' 28 9 INDUSTRIAL COMPOSITION, CITY OF WASHINGTON, 1970 29 00 MALE .EMPLOYMENT BY OCCUPATION, CITY-OF WASHINGTON, 196-0-1970 30 11 FEMALE S\lPLOYMENT BY OCCUPATION, CITY OF WASHINGTON, 1960-1970 31 12 CURRENT PLANS, POLICIES AND REGULATIONS, CITY OF WASHINGTON 47 13 LIMITATIONS OF SOIL ASSOCIATIONS ... BEAUFORT COUNTY, 1971 90 14 WATER AND SEWER PLANTS, CITY OF WASHINGTON 107 is PRIMARY ROADS, WASHINGTON PLANNING AREA 109 16 POPULATION PROJECTIONS, CITY OF WASHINGTON AND EXTRATERRITORIAL AREA, 1980-2020 125 17 POPULATION TRENDS, WASHINGTON TOWNSHIP AND CITY OF WASHINGTON, 1940-1970 126 18 POPULATION PROJECTIONS, BEAUFORT COUNTY AND TOWNSHIPS, 1970@2000 127 9 REQUIRED FI RE FLOW 134 LIST OF MAPS Map Number Description Page Map I Regional Setting 2 Map 2 Washington Planning Area 4 Map 3 Existing Land Use 33 Map 4 Flood Hazard Area 86 Map 5 Soil Associations 89 Map 6 Water Supply Area 100 Map 7 Stream Classification 102 'Map 8 Water and Sewer Service Area 106 Map 9 Land Classification 139 INTRODUCTION PART I Elizabeth City Ahoskie Williamston CD Greenville WASHINGTON -o@ New Bern MAP I REGIONAL SETTIN 2 PURPOSE OF PLAN North Carolina's coastal area is considered one of the most important regions for food production, sport and co:mmercial fishing, future expansion of commerce, industry and recreation. Pursuant to the orderly gro wth and protection of im- portant natural resources of this area, the 104 General Assembly passed the Coastal Area @bnagement Act of 1974 (CAMA). CAMA is a state law that require s all local governments in Coastal North Carolina counties and towns to develop a land use plan for their future growth. This land use plan will be considered the official guide for the future develop- ment of Washington and its extraterritorial jurisdiction. The plan allocates various land uses to specific areas so as to correct inadequacies in past land development patterns and to assure appropriately related future development. Goals and objectives are also stated in this plan. To accomplish the goals and objectives of this plan, the adoption of imp lementation programs is a neces- sity. Legal tools such as Zoning Ordinances and Subdivision Regulations will adhere to the plan. In addition, capital improvement programs as well as short and long-range financial plans should serve to carry out plan objectives., Utilization of this plan will result in more cost effective use of public funds and a higher quality of life for Washingtonians. GENERAL APPROACH This plan assesses present land use patterns and problems within the Planning Area and sets forth recommendations for alleviating those problems. It analyzes possible future land development problems and needs, and recommends procedures for avoiding such'problens . @bre importantly, this document provides a policy guide for use by the Planning Board, the City Manager, and City Council for making day-to-day decisions bearing on land development and services. 3 V38V 9NINNV]d IVI8OiIdd3lVdiX3 _0 lVdIOINnw V3dV t)NINNVId tl Nf E3 N I N N v I d 3 Aj JLEINIHSV/Vl dVN 77 IN All @Ml 3. . . . . . . . . . . . . . .. . . . . . . . N%b 4 WOOD T UIT STUDY AREA, DEFINED Reference will be made to the Study Area or the Washington Planning Area. Ihis Study Area consists of the City of Washington and its extraterritorial zoning andIplanning jurisdiction which extends one and me-half (1k) miles in all directions. The Washington City Council has legal authority to guide future growth and development through the administration.of.zoning and subdivision regu- lations, as well as through extension of municipal services. Thus, this land use plan.considers the-land area contiguous to Washington, since most 'new devel- opment is projected to occur there due to its undeveloped character. Map 2_ depicts the Washington Planning Area. AUTHORITY TO PLAN North Carolina CODE, Part 1 of Article 19,' provides the enabling legislation for the cities and towns within the State to create or designate one or more plan- ning agencies. In part, Section 160A-361 of Article 19 states: "Any city may by ordinance create or designate one or more agencies to perform the following duties: (1) Make.studies of the area within its jurisdiction and surrounding areas; (2) Determine objectives to be sought in the development of the study area; (3) Prepare and adopt plans for achieving these objectives; (4) Develop and reconmnd policies, ordinances, administra- tive procedures, and other means for carrying out plans in a coordinated and efficient manner; (5) Advise the council concerning the use and amendment of means for carrying out plans; (6) Exercise any functions in the administration and enforce- ment of various means for carrying out plans that the council may direct; 5 (7) Perform any other related duties that the council may direct... Article 19 further provides that the planning agency may prepare a zoning plan, including both text and maps showing the various zoning districts. Pur- suant to Section 160A-'383 of that same Article, those zoning' regulations are to be made in accordance with a conprehensive plan and designed to lessen street congestion, to secure safety from fire, panic, and other dangers; to promote health and general welfare; to provide adequate light and air; to prevent the overcrowding of land; to avoid undue concentrations of population; and to facili- tate the adequate provision of transportation, water, sewerage, schools, parks and other public requirements. PLAN FORMAT11 1his land use plan is divided into ten major_p arts. PART I, the Introduction, is designed to provide the reader with a brief plan coverage, and a general his- toric and geographic description of the Washington Planning Area. PART II is a descrip#on of present conditions in the area. It contains background data on the physical, urban and built-up characteristics of the environment. PART III consists of public participation activities. These activities are discussed in the con- text of citizen identified major land use issues and problem . PART IV discusses, land-use development constraints. PART V addresses estimated population and eco- nomic demands. 'Future land needs and commity facilities demands are included. PART VI is the land use plan description. It discusses the land classification system. Areas of environmental concern are addressed in PART VII. PART VIII is As mandated by Subchapter 70 - "Generally Applicable.Standards of Review for Land Use Plans and Synopsis. 6 designed to summarize the content of the plan with statements of major conclusions. The final part, PART IX, defines the city-county plan relationship, HISTORIC SETTING "THE CITY AND THE RIVER'al On March 24, 1663, Charles II of England gave eight Englishmen a Proprietary Charter granting to them all territory lying between 31 and 36 degrees @orth lati- tude, extending westward to the South Seas (Pacific Ocean). Charles II gave them this enormous grant of land to repay them for helping to restorehim to his throne after the civil wars following th e fall of Charles I. The land that is now Washington was granted by these Lord-Proprietors on July 30, 1726 to Christopher Dudley. This grant.coi @tained the area from Jack's Creek to Union Alley, north to Fifteenth Street and to where Twelfth Street and Charlotte Street would intersect if Charlotte Street were extended. On October 16, 1729, Thomas Bonner purchased this 337 acres of land. His son James eventually recieved all this land. Washington was actually founded in the fall of 1775 when Jams Bomerheld a lottery to dispose of lots in his proposed town. It is referred to here as a pro- posed town because it was-not approved by.either the General Assembly or the Pro- vincial Congress due to the confusion of the approaching Revolutionary War. The town was.first known as the "Town at the Forks of the Tar River." It consisted of 30 acres of Bonner's farm divided into 60 lots, six streets and an alley, the streets being Water, Main, Second, Third, Market and Bonner. Union Alley ma*rked the Western YUnpublished project paper by Glenn Woolard G&y 3, 1975)0 pp. 2-13. 7 boundary and was the axis around which future expansion occurred: Thomas Res- pess later laid out additional lots.to the west of Union Alley which doubled the size of the town. Ihe first record of the town being named.Washington did not appear until 1776. Therefore, the year 1776 is accepted as the year that Washington was founded. It was also the first town in the United States to be named Washington and i@ the basis of the town's present motto of "The Original Washington Since 1776.1' The-Pamlico River hasplayed a major role in the town's development. Even before itbecame a town, the river enabled Washington to become a center of com- merce. In 1758 James Bonner sold lot number one of his future town to Aquila Sugg, a merchant from Edgecombe County. The lot consisted of 105 feet offrontage on the river and back 210 feet from the river. Sugg purchased some more lots and erect- ed a wharf, warehouse, and other buildings. From these facilities he shipped naval stores and other produce brought*down the Tar River on flat-bottom barges. Vessels bringing goods upstream preferred to come to.Sugg's wharf'instead of Bath, because .Washington was 20 miles further inland. The merchants of Bath probably encouraged Bonner to start his town without the Assembly's approval. Thus, this advantageous location for water commerce and transportation was a key factor in the town's being established. Before the Revolutionary War, Washington's early merchants established a profitable business by exporting naval stores to Great Britain. These exports gave Washington a thriving initial economy., because Great Britain badly needed naval stores to maintain its navy. When the First Continental Congress cut off trade with Great Britain, Washington's thriving economic base was lost tempora- rily. The merchants faced bankruptcy. Merchandise piled up on the wharves and in the warehouses.. The growth of the infant town was threatened. 8 The merchants, however, adjusted to these new circumstances and the new town again flourished. Two major factors made this revitalization of the e conomy possible. First, the Continental Army's and the Militia's urgent need for food and supplies provided a new market for,the plantations which used Washington as a port. Second, the shallow inlets and shifting channels of Pamlico Sound were no longer a handicap to shipping. Small vessels carrying supplies to and from New England and the non-British West Indies could slip through the inlets and escape from the larger British men-of-war. With a growing demand f@r sailing schooners and brigs, ship builders in Washington also prospered. As other ports were either captured or blockaded, Washington's importance increased. After the Revolutionary War, Washington continued to grow and prosper as a port. In 1782, Thomas Respess began to sell the lots to the 'west of Union Alley. In less than six months, he had sold 35 of his 52 lots. This area was kmown as Respess Town. Respess sold the reminder ofhis land to John Gladden. Gladden developed this area to the north of Respess Town as Gladden Town. This expansion again doubled the size of the town. In 1785, Washington became the county seat of Beaufort County and has -remained the county seat throughout its history. The county seat was transferred from Bath to Washington, because Washington was becoming the commercial center for the county, and it could better accommodate the people participating in the courts. This gave the town's citizens more prestige and also resulted in more people traveling to Washington from various places in Beaufort County. With a sound economic base, the town's physical boundaries continued to expand. Hadrianus Van Norden laid out Van Norden Town on the land extending from Respess Town to present Washington Street and north to Sixth Street. James Banner added land from his farm as far north as Sixth Street. This was called Banner's New Part 9 as distinguished from the original town (60 lots) known as Bonner's Old Part. Land east of Bonner Street known as Pungo Town was later opened for development. Although the town was thriving, it faced two m.ajor crises in the mid 1800's the first in the loss of human lives and'-the second in the near destruction of the whole town. Wsquitoes carrying yellow fever were brought in on a vessel-from the West Indies. The epidemic of yellow-fever was theworst in.Washington's his- tory. The future and present labor force of the town paid its toll with as many as seven deaths in a single day. The second crisis occurred during the Civil War when the Yankees burned half of the town including most of its churches. A second fire resulted when a Washingtonian" family, upon hearing rumors that th e Yankees were returning, piled their valuable papers outside and set fire to them so the Yankees could not get them. The fire went out of control and burned the second half of the town. Reed vividly describes the conditions of the town after the Civil War in the following quotation: Thoze who had te6t the gay, puzpaous and thAiving town oJ Wazhington, with a poputation oJ oveA 1,600, came home to a zhett-xiddted, bukned- out Aetetono4 a town, peopted by Jew mou than 500 haAd-eyed, gxim- vizag.ed men and women, and a zcatteting oJ hottow-eyed, hunguy ckitdken. They at.6o came home to gkinding poveAty and back-buaking tabok that Jew, i6 any, in BeaujbAt County had Aeamed o6 beJou the wa,%. Having survived these hardships and others, the town's growth and economy was again bolstered by its location on the Pamlico River. The town's growth in the re- mainder of the nineteenth century was typical of most cities of its size. In- fluenced by a changing tec1mology and culture; paved streets, electric lights, a gas plant, telephone lines, better schools and more churches were gradually added to the town. By 1889 it had reached its peak as a port. @bre than one-half of the 10 state's commerce was passing through the Washington Port, and the city rated only second to Wilmington in shipping. The waterfront was covered with numerous ware- houses, wharves, ind:ustrial. buildings and shipyards. The thriving commercial activity along the waterfront was the core of, the town Is economy. At the turn of the century, this relation between the town and the river was drastically changed due to several technological factors. With the building of railroads and hard surface overland roads, the advent of modern trucking lines and the industrial development taking place inside the United States, Washington's shipping industry began to decline. Washington gradually diminished in importance as a business and distribution center. An economic downturn followed. During this period the waterfront was gradually becoming a blighted scar of the past in the.central business district. -The wharf was still in use about 40 years ago. There was some loading and unloading at nights. The noise distrubed the patients in the Riverview Hospital and some of the doctors who were on the city board wanted to do away with the wharf. Several years later the wharf began to be done away with a little bit at the time . In 1950, one steamboat line was still carrying freight out of the nearly deserted port (waterfront area). By 1951, there were only a few barges, tug boats and sailboats coming up the Pamlico River to Washington. The former commercial waterfront was now only a harbor for old wharf rats as big as small puppies. The accumulation of rats along the deserted waterfront was a definite environmental problem. These rats spread into various portions of town especially in the lower income areas. Eve-ryone burned wood except those in the high income class who burned coal. There were usually rats around the wood piles. At this tire people not living on Wn Street still raised chickens. .They had to build coups raised up off the ground to keep the rats from killing their chickens and eating the eggs. The rats also accumulated around the poorer kept open drainage ditches. Little growth occurred in Washington until the end of World War II. At this tim , the citizen leaders began to work for new economic development. A shirt factory was the first industry acquired, and the conmmity was so excited that it constructed a plant for the industry. A truck body manufacturer and a garment manufacturer were home developed industries. A synthetic yard plant was also acquired. This industrial development continued at a steady pace with an electri- cal appliance industry, a textile dyeing operation and a filter making industry coming to Washington. Me most recent ones acquired are a boat manufacturer and a valve manufacturer. Four public housing projects and four urban renewal projects have made the greatest change in Washington's landscape in the past decade. In 1961, the City Council recognized a need for these program . The Council appointed a Citizens Connittee to investigate the possibility of establishing such programs in Washing- ton. The Committee toured other cities to view existing programs and made in- quiTies throughout the state. After a positive recomendation from the Committee, the City Council appointed Boards of Coffunissioners for a Washington Housing Authority and for a Redevelopment Comission. Of these projects, the Downtown-Waterfrant Urban Renewal Project has re- sulted in a dramatic change of the waterfront in the central business district. The political process behind the plan being approved will be briefly outlined. Me plan was first approved by the Cormissioners of the Redevelopment Comission. A public hearing was held and there were no objections to the plan. The plan was then approved by the City Planning Conmission and finally by the City Council. From a list of eight-objectives there were two over-riding objectives. One was to redevelop the waterfront so the City and Comercial center would again relate to the river, and the river would enhance the setting of the city and the Central 12 Business District. Another objective was to rehabilitate and revive the Central Business District as the commercial center of the city. The project area consisted of 45 acres and 169 structures. Seventy-five per- cent of the buildings were found to have deficiencies. In addition, there were some very important environmental deficiencies: 1) Detrimental and incompatible land uses - The old run down buildings along the waterfront formerly used in water COMMTce -related activities no longer had such a -relation to the town or the -river. There were unsightly and depressed land values in the Central Business District. 2) Obsolete bui lding types - some buildings, 50 years or older, had been adapted many times for changing needs but were not designed for their present uses. 3) Overcrowding - The waterfront had been.-developed in a time with few zoning and building codes, resulting in a haphazard arrangement of structures. There was@ also poor vehicular circulation, inadequate open space for recreational uses and inadequate storm drainage facilities. In executing the'project the entire Downtown waterfront area was cleared of abandoned warehouses, -rotting pier pilings, deadend streets, and dilapidated build- ings. A 1900 foot steel bulkhead was constructed and backfilled with sand pumped from the river. This created about five acres of land on which Stewart Parkway was constructed. On the strip of land between the bulkhead and the parkway are a line of Japanese Cherry trees and other shrubbery and several benches. This provides a park-like area for the public and also an attractive visual approach for people entering Washington on U. S. Highway 17. The bulkhead has free water and metered electricity to accommodate overnight docking. On the cleared land, 350 free.off- .street parking spaces were built. Some of the cleared land was also sold for the Fass Brothers Restaurant and the Page office b uilding. During this same time period, a peripheral shopping center, Washington Square, was developed. Since 1963 the city had substantially increased its corporate 13 limits to the north. Therefore, it was felt that the Central Business District could no longer effectively serve the entire planning area. Washington Square was opened in 1972. It was meant to relieve a little of the past saturation in the Central Business District; however, the shopping center's conpetition for the shopper's dollar became a threat to the economic status of the Central Business District. During late 1973, Main Street and Market Street were also renovated in an effort to c.reate a semi-mall atmosphere in the downtown area. Sidewalis were widened,, and some on-street parking was removed and replaced with planters and benches. Irproved street lighting was installed. The once shoddy looking dark alleys leading from the streets to the parking lots were paved, lighted, and decorated. The Down-town-Waterfront urban -renewal project has successfully accented the natural scenic advantages of the Pamlico River and also created a semi- mall.atmosphere. Sore of the downtown merchants also took it upon themselves to renovate the fronts of their stores to give them a more modem appearance. All these physical changes are serving to provide the downtown area with a more pleasant water oriented shopping area. Thus, from the founding of Washington to the present, the relation between the town and the river has undergone a drastic change. From the town's infancy and on through the 18001s, the town had a definite economic relationship with the TlVer as a thriving port. With the turn of the century, the waterfront began to deteriorate primarily due to the advent of modem transportation. It was not until the late 1960's that the blighting scar of the once thriving waterfront was re- moved. The town is now trying to establish a new relationship with the river to again revive the downtown economic status. The river will continue to play 14 an important -role in the development of Washington, but it is doubtful if the downtown waterfront area will ever be as an important marketing center as it was in-the 18001s. The emphasis now being placed on the river is for recreation, a scenic ride down the Pamlico to lure industrial prospects to Washington. GEOGRAPHICAL SETTING Beaufort County is located'in the.central coastal section of North Carolina and lies entirely within the Atlantic Coastal Plain physiographic province. Its approximately 831 square-mile land area is bound on the North by Martin and Wash- ington Counties, on the east by Hyde County and Pamlico Sound, on the, south by Pamlico and Craven Counties, and on the west by Pitt County. The coun ty is divided almostin half by the Pamlico River which runs east and west through the county. Washington, the county seat, is located in-the extreme western portion o'f Beaufort County and along the north bank of the Pamlico River at its confluence with the Tar River. Approximately 105 miles west is the City of Raleigh, the State Capital; and 135 miles north is the City of Norfolk, Virginia, and the Ports 3/ of Haropton Roads.- Beaufort is the eighth largest county in North Carolina and has a total land area of 831 square miles, or 531,840 acres, At its widest points, the county ex- tends approximately 35 miles north to south. The county is divided almost equally into northern and southern sections by the Pamlico River. Although Beaufort County's surface is low and gene-rally level, there are un- dulating and gently rolling areas near the streams in the western and southern parts of the county. The highest point in the county is along its southern border and City of Washington and Beaufort County: An Economic Study, Virginia Electric and Power Company (May, 1964), p. 1. is 67 feet above sea level. Elevations along the extreme eastern part of the county, in the vicinity of Belhaven and Leechville, range from 2 to 5 feet above sea level.i/ In the City of Washington and its planning area the elevations run from about three feet above sea level at Kennedy's Creek to 46 feet above in Enumera- tion District 31. The downtown area varies from approximately 5 to 10 feet above sea level in elevation. Me U. S. Axmy Corps of Engineers has designated all land below 10 feet as part of the Washington flood plain zone. The la@d generally rises from the river increasing in elevation to the North. The sh arpest varia- tions occur in the southwestern part of the extraterritorial jurisdiction in Enumeration District 36 where the land varies in elevation from 36 to 46 feet. The climate of Washington, North Carolina is relatively,. mild. The man tem- peraiure for the area is 620 F. The average rainfall for the area is 49.7 inches per year. The average snowfall is less than three inches per year. An indica- tion of the mildness of the climate can be found in the mean temperature of the traditionally harshest winter months; December, January, and February, which is 45.30 F. The average growing season is favorable for most crops. 1he average frost free season extends from April to October, providing the farmers of the area with a producing season of 214 days. YIbid., p. 3. 16 DESCRIPTION OF PRESENT CONDITIONS PART Il 17 POPUL ATION The City of Washington experienced substantial growth from 1900 until*1960.@@ During this time the City showed a growth of +48.2% compared to a rate of +26.7% for Beaufort County. While the City showed a gain from 1950 Census to the 1960 Census, the rate of growth during the Fifties was the lowest since the 1910's; Beaufort County on the other hand had,a net decline in population. This is evli@ dence of two migration streams, one.coming from rural areas to the City, the second leaving the County entirely when economic opportunities were not to be found in the City of Washington. However, the 1970 Census showed a different flow. While the County as a whole experienced another decline of -.9%,.the City felt a sharp -9.8% decline. The migration waves during this decade were (1) out of the County and (2) out of the City, a.reflection of its exceedingly poor housing conditions, and a displacement of families during urban renewal. The City's decline is even more pronounced when natural population increase from 1960 through 1970 is taken into account: 1960 Population . . . . . . . . 9939 Natural increase (births over deaths) . . . 800* Expected 1970 population . . . ... . . . . 10739 Actual 1970 population . . . . . . . . . . 8961 Net outmigration . . . . . . . . . . . . . 1778 Outmigration in the 1960's occurred mainly in the below 14 age group and the 24-45 age group. The over-5S categories showed major gains. In the future the City will have more demands made on it by the middle aged and elderly. A significant increase in the elderly population and a maj'or decrease in those under 24 has implications in programming in the recreation department, and a slackening impact on the school system. Fewer working age people will be avail- able for industries that might wish to locate here or to expand their operations. *Source: N. C. State Department of Human Resources, Division of Health Services 18 There will be a greater need for delivery of service to the elderly in -the areasil of housing, health care, and recreation. 19 TABLE .1 POPULATION TRENDS BEAUFORT COUNTY 1900 1970 YEAR COUNTY NUMBER CHANGE PERCENTAGE.CHANGE 1900 26,404 1910 30,877 4,473 + 16.9% 1920 31@024 147 + ..5% 1930 35,026 4*,002 + 12.0% 1940 36,431 1,405 + 4.0% 1950 37,134 703 + 1.9% 1960 36,014 -1,120 - 3.11 1970 35,980 - 34 - .9% Source: U. S. Census of Population 20 TABLE 2 POPULATION TRENDS CITY OF WASHINGTON 1900 - 1970 YEAR CITY NUMBER CHANGE PERCENTAGE CHANGE 1900 4,842 1910 6,211 1)369 28.3% 1920 6,314 103 1.7% 1930 7,03S 721 11.4% 1940 8,S69 13,534 21.8% 1950 9,698 1,129 13.2% 1960 9,939 241 2.5% 1970 8,961 978 9.8% Source: U. S. Census of Population TABLE 3 POPULATION CHANGE BY AGE GROUP AND RACE- CITY OF WASHIVGT79- 1960 1970- 1960 1970 CHANGE 1960-1970 NUMBER PERCENTAGE AGE GROUP WHITE NONWHITE WHITE NONWHITE WHITE NONWHITE WHITE -NONWHITE All S66 S91. 401 335 -165 -256 -29.2 -43.3 Under 5 S-14 1,166 1,028 830 864 -366 -164 -28.8 -15.S 1S-24 782 488 844 697 + 62 +209 7.9 +42.8 25-34 753 426 56S .27.2 -188 -154 25.0 .-36.2 35-44 798 424 Sol 373 -207 - 51 -26.0 -12.0 45-54 763 432 6S9 410 -104 -122 -13.6 - 5.1 55-64 S21 308 660 401 +139 + 93 +26.7 +30.2 65 & over 599 294 704 35S +10S + 61 +17.5 +20.7 Source: U. S. Census of Population TAO 4 POPULATION CHANGE BY AGE GROUPS, SEX AND RACE: 1950-1960 FOR CITY OF WASHINGTON WHITE MALES CHANGE WHITE FEMALES CHANGE 1950 1960 AGE Num. er PERCENTAGE 19so 1960 Tu--mber PERCENTAGE Under 5 360 302 - 58 -16.1 346 264 - 82 -23.7 1S-24 474 611 +137 +63.S 388 555 +167 +96.6 25-34 461 347 -114 - 2.4 S13 406 -106 -29.8 35-44 411 360 - 51 -12.4 443 438 - 5 - 1.1 45-54 28S 351 + 66 +23.2 340 412 + 72 +21.2 S5-64 224 229 + 5 + 2.2 251 292 + 41 +16.3 65 & Over 162 230 + 68 +42.0 247 369 +122 +49.4 TOTAL 2,746 2,782 + 36 + 1.3 3,b64 3,166 +102 + 3.3 NON WHITE MALES CHANGE NON WHITE FEMALES CHANGE AGE 1950 1960 Number PERCENTAGE 1950 1960 Number PERCENTAGE Under 5 222 297 + 75 +33.8 237 294 + 57 +24.1 S-14 401 487 + 86 +44.0 368 441 +173 +93.8 15-24 329 251 - 78 -50.4 378 237 -141 -74.6 25-34 245 197 - 48 -19.6 311 229 -. 82 -26.4 35-44 2SS 178 - 77 -30.2 287 246 - 41 -14.3 45-54 166 184 + 18 +10.8 216 248 + 32 +14.8 SS-64 108 144 + 36 +33.3, 115 164 +-49 @+42. 6 65 & Over ill 123 + 12 +10.8, 139 240 + 32 +23.0 Total 1,837 1,861 + 214 + 1.3 2, 051 2,130 + 79 + 3.9 SOURCE: U. S. Census of Population T* POPULATION CHANGE BY AGE GROUPS, SEX AND RACE: 1960-1970 FOR CITY OF WASHINGTON WHITE MALES CHANGE CHANGE WHITE FEMALES CHANGE CHANGE AGE 1960 1970 NUMBER PERCENTAGE F960-1970 NUMBER PERCENTAGE Under S 302 215 - 87 -28.8 264 186 - 78 -29.S 5-14 611 419 -192 .-31.3 555 411 -144 -2S.9 14-24. 352 387 +35 + 9.9 430 4S7 + 27 + 6.3 25-34 347 276 -71 -20.5 406 289 -117 -28.8 35-44 360 278 -82 -22.8 438 313 -12S .-28.5 4S-54 3S1 285 -66 -18.8 412 374 - 38 - 9.2 55-64 229 274 4S +19.7 292 386 + 94 +32.2 65 & Over 230 252 +22 + 9.6 369 452 + 83 +22.S TOTAL 2,782 2,386 -396 -14.2 3,166 2,868 -298 9.4 NON WHITE MALES CHANGE CHANGE NON WHITE FEMALES CHANGE CHANGE AGE 1960 1970 NUMBER PERCENTAGE -1960 1970 NUMBER PERCENTAGE Under 5 297 17S -122 -41.1 294 160 -134 -45.6 5-14 487 441 -46 - 9.4 441 423 - 18 - 4.1 1S-24 251 336 +85 +33.9 237 361 +124 +S2.3 25-34 197 121, -76 -38.-6 229 151 - 78 -34.1 35-44 178 153 -25 -14.0 246 220 - 26 -10.6 45-54 184 179 - 5 - 2.7 .248 231 - 17 - 6.9 55-64 144 172 +28 +19.4 164 229 + '65 +39.6 65 & Over 123 161 +38 +30.9 240 194 46 -19.2 TOTAL 1,861 1,738- -123 6.6 2,130 1,969 -161 SOURCE: U. S. Census of Population EDUCATIONAL ATTAINMENT The decade of the Sixties witnessed a change in.the number of years.of school completed with a substantial drop-off both in the number of people who had completed no.schooling and in the number that had finished only elementary school through the 8th grade. A greater percentage went on to complete high school and four years of college. TABLE 6 YEARS OF SCHOOL COMPLETED CITY OF WASHINGTON 1960 and 1970 TOTAL 1960 1970 NUMBER CHANGE PERCENTAGE CHANGE Male and-Female 25 yrs & over 5,347 4,995 -352 - 6.6 No School years completed 286 128 -158 -55. 2 Elementary: 1 - 4 yrs. 731 639 - 92 -12.6 5 - 7 yrs. 1,200 881 -319 -26.6 8 yrs. 529 484 - 4S - 8.S High School: I - 3 yrs. 931 1,001 + 70 + 7. 5 4 yrs. 941 1,147 +206 +21.9 College:, 1 3 yrs 434 361 - 73 +16.8 4 or more 29S 354 + 59 +20.0 Median School years completed 8.9 10.1 +1.2 +13.5 SOURCE: U. S. Census of Population, 1960, 1970. 25 ECONOMY Agricultural employment in Beaufort County has steadily declined since 1940, and by 1960 represented only 27 percent of total employment, 11 percent in 1970. The primary reason for this decline lies with the continued growth of mechanization. and automation on the county's farms. Although over 1700 males left agricultural employment between 1950 and 1960, nonagricultural male employmont-increased'by only 13 persons during the same period within the county. A concerted cooperation effort on the part of business, civic, and local governmental leaders to attract an increased industrial base met with success during the sixties. Four significant plants located in the area: Hamilton Beach in 196S, a Division of Scovill Manufacturing which manufactures household appliances; Flanders Filters, Inc. in 1969, a manufacturer of filters for a variety of industrial uses; Seacrest Marine in 1971, a manufacturer of boats; and Atwood & Morrill in 1972, a valve manufacturer. By the 1970 Census the industrial composition of the City of Washington.was predominately wholesale and retail trade with 26.3 percent of the total number of persons empl oyed, followed by manufacturing with 21.8 percent of total number of persons employed (see tables 7 &8). Most occupational categories showed significant gains during the Sixties as follows: TABLE 7 CHANGE IN OCCUPATIONAL CATEGORIES Male Female Growth private household workers clerical and kindred clerical and kindred operatives service workers professional, technical operatives and kindred kindred professional, technical & kindred farmers and farm managers craftsmen, foremen & kindred No Change laborers except farm Decline farm laborers and farm foremen managers and administrators managers and administrators sales workers sales workers private household workers 26 Males and females both felt declines in the numbers of jobs available in sales and.as managers and administrators. Farm laborer possibilities'again declined for men, and laborers except farm laborers showed no change. Private household employment declined for women, yet increased for men. 27 TMLE 8 INDUSTRIAL COMPOSITION 1960 INDUSTRY NUMBER EMPLOYED PERCENT OF TOTAL Agriculture, forestry., and fisheries 97 2.7 Construction 243 6.9 Manufacturing Durable 232 6.6 Nondurable 427 12.1 Transportation, communications, and other public utilities 162 4.6 Wholesale and retail trade 945 26.7 Finance, insurance, and real estate 170 4.8 Business and repair services 82 2.3 Professional and related services 399 11.3 Public administration 136 3.8 Personal services 538 15.2 Entertainment and recretaion services 21 .06 No report 86 2.4 00 Total employed 16 years and over 3,538 SOURCE: U. S. Census of Population TABLE 9 INDUSTRIAL COMPOSITION. 1970 INDUSTRY NUMBER EMPLOYED, PERCENT OF TOTAL Construction 237 6.7 Manufacturing Durable 2S4 Undurable 517 14.6 Transportation 52 1.5 Communications, utilities, and sanitary services 136 3.8 Wholesale and retail trade 932 2& 3 Finance, insurance, business and repair services 184 S.2 Professional and related services S52 15.6 Public administration 110 3.1 Other industries 567 16.0 Total employed 16 years and over 3,541 SOURCE: U. S. Census of Population TA)3L* MALE EMPLOYMENT BY OCCUPATION Occupation Number as % Number as % Male 1960 1970 Number Change Percent Change of Total 1960 of Total 1970 Total employed 16 years old and over 2,097 3,541 1,444 68.9 Professional, technical, and kindred 141 325 184 +130.5 6.7 9.2 Manager and administratorsl 298 276 - 22' - 7.4 14.2 7.3 Sales workers 241 233 - 8 - 3.3 ll.S 6.6 Clerical and kindred 57 488 + 431 +756.1 2.7 13.8 Craftsmen, foremen, and kindred 3S4 512 + 158 + 44.6 .16.9 14.5 Operatives and kindred2 480 1,300 + 820 +170.8 22.9 36.7 Laborers except farm3 2SS 2SS 0 0 12.2 7.2 Farmers and farm managers 19 30 11 + S7.9 .1 .1 Farm laborers and farm foremen 42 6 - 36 - 8S.7 2.0 .002 Service workers 129 422 + 293 +227.1 6.2 11.9 Private household workers 16 272 + 256 +1600 .1 7.7 Occupation not reported 65 x - 65 - 100 3.1, 0 1. 1960 Census titles this category "Managers, officers, and Proprietors except Farm." 2. 1970 Census broke this category into "Operatives except Transport" and "Transport Equipment Operatives." 3. 1960 Census titles: "Laborers except Farm and Mine." SOURCE: U. S. Census of Population, 1960 and 1970. TABLE 11 FEMALE EMPLOYM]Wr BY OCCUPATION Occupation Number as % Number as % Female 1960 .1970 NUMBER CHANGE PERCENT CHANGE of Total 1960 of Total 1970 Total employed 16 years old and over 13,441 1,574 +133 + 9.2 x x Professional, technical, anq kindred 156 157 + 1 + .06 10.8 10.0 Managers and administrators 60 20 - 40 -66.6 4.2 1.3 Sales workers 116 89 - 27 -23.2 8.0 5.7 Clerical and kindred 2 265 426 +161 +60.7 18.4 27.0 Operatives, including transport 194 300 +106 +54.6 13.5 '19.1 Service workers, except private household 251 280 + 29 +11.5 17.4 17.8 Private household workers 333 256 - 77 -23.1 23.1 16.3 Other occupations3 .33 46 X x 2.3 2.9 No report 33 0 x x 2.3 x 1. 1960 Title: '%nagers, Officers, and Proprietors, excluding farm." 2. 1960 Title: "Operatives and Kindred." 3. 1960 Census listed 8 Craftsmen, Foremen, and Kindred, 13 Farm Laborers and Foremen, and 12 Laborers comprising 2.3% of occupations for women. 1970 Census does not indicate composition of the "other" category. SOURCE: U. S. Census of Population, 1960 and 1970. Unemployment Unemployment in the City of Washington varies seasonally. In general, the winter months December, January and Pebruary have the highest rates of unemploy- ment. In 1973, the insured unemployment high was 5.6% in December, while January, 1974, had an unemployment rate of 4.6%, February had a rate of 3.9%. There are several reasons for seasonal variations in employment for this area. Business for the seafood industry and its subsidiaries is very slow during the winter months (fishermen, packers, etc.). Several major employers in the area close for inventory for approximately 2 to 3 weeks during the winter, style changes or production changes occur then necessitating,plant shutdowns, and agricultural activity is extremely slow. The following'is a breakdown of unemployment rates from January, 1974 to October, 1,975. Insured Unemployment_ Beaufort County January 1974 4.6% Feburary 1974 3.9% March 1974 4.5% April 1974 3.9% May 1974 1.4% June 1974 2.1% July 1974 1.1% August 1974 .9% September 1974 1.1% October 1974 1.4% November 1974 2.3% December 1974 8.5% January 1975 13.1% February 1975 14.0% March 1975 14.S% April 1975 12.2% May 197S 6.9% June 1975 5.5% July 1975 4.7% August 1975 4.0% September 1975 3.7% October 1975 3.7% SOURCE: N. C. Employment Security Commission 32 EXISTINGIAND USE MAP 33 EXISTING LAND USE This section will analyze the existing land use patterns in the Washington Planning Area as depicted on Map 3 . An analysis of existing land.use patterns is a necessary component of any land use plan since decisions regarding future development cannot be made intelligently without a prior understanding of existing development. However, before looking at-the urban and built-up characteristics of the Washington Planning Area, let us examine the land's physical characteristics. Physical Characteristics of Area Land -Beaufort County is underlain by,a wedge of Tertiary and Cretaceous sediments which are 1,000 to 2,000 feet thick. The formations are covered nearly everywhere by the Pleistocene terrace deposits. These terraces are the outstanding physio- .graphical features of this area and form irregular belts-extending in a general northeast-southwest direction. The underlying rocks dip in a general eastward direction and consist of alternating layers of surficial sands and clays of Quaternary age and ranging from 10 to 30 feet in thickness. Beds of blue clay, marl, shells, and shall limestone that constitute the York- town formation, lie beneath these surficial deposits and range from 40 feet thick in the western part.of the county-to 200 feet in the countyls'eastern extremity. This Yorktown formation is underlain by layers of phosphatic sand that are separated by one or more, indurated shell beds. This unit of phosphatic sand and indurated shell beds ranges from a few feet to more than 120 feet in thickness. Individual beds of phosphatic sand are as much as 20 feet thick. Analyses of recent core samplings indicate that there are more than 10 billion tons of.phosphate ore in the county and that it is economically feasible to mine. These deposits are found beneath an area covering approximately 700 square miles. The phosphate deposits in the Aurora area are found between.80 to 100 feet below the surface and range from 40 to 50 feet in thickness. 34 Underlying these deposits are shell limestones and interlayered calcareous sands of the Castle Hayne limestone of late Eocene Age. This formation is about 60 feet thick near the western border of the county and perhaps as much as 2SO feet thick.along the eastern border of the county. The Beaufort formation of Paleo- cene agej composed of agrillaceous sand. Glauconitic sand, and marl, underlies the Castle Hayne limestone throughout most of the county. Few data-are available con- cerning the thickness of the Beaufort formation. Two miles north of Washington, the formation is 35 feet thick and, according to limited data, the formation thickens rapidly and is buried progressively deeper towards the east. Underlying the Beaufort formation are glauconitic sands and micaceous clays of the Peedee formation of late Cretaceous Age. No data regarding the total thickness of this formation is Beaufort County are available. One mile west of Washington, the top ofthe Peedee was pene- trated at a depth of 158 feet below sea level. In eastern Beaufort County, extrap- olated data indicate that the top of the Peedee formation lies about 700 to 800 feet below sea level. Beneath the Peedee formation are older Cretaceous sediments. 5 Surface Water Beaufort County is drained by relatively slow-moving streams that flow into the Pamlico and Pungo Rivers. These, in turn, empty into Pamlico Sound. Although the construction of deep drainage ditches has made much swampland available for agricultural purposes, there still remains much swamp area in the county. These reclaimed swamplands are among the most fertile in the state. The chemical character of surface waters is influenced in varying degrees by geo- chemical processes, rainfall, run-off, winds, tides, and stream pollution. Hurricane winds in 1955 forced salt water up the Tar River for a di stance of approximately 10 miles upstream from Washington. Sea water remained at advanced points on the Tar River SIbid@., p. 12. 35 during mostof 195S (water year) due to the combination of prevailing winds and low rainfall in the watershed area. Streams in North Carolina's Coastal Plain physiographical province carry sedi- ments consisting of sand, clay, and limestone, and marl. The color of the waters in these streams varies with the season and river discharge. Generally, the higher colors occur during periods of relatively heavy rainfall (late summer and early fall) when colored water and decaying organic 'matter are flushed from the swampy areas.6 Pamlico River - The largest body of water in the Washington Planning Area is the Tar-Pamlico Estuary. This river flows past Washington, one side forming the city limits. The Pamlico River is a large coastal river with physical,chemicaland bio- logical characteristics usually associated with an estuary. Except for a gradual increase in salinity gradent increasing to the east (in the direction of the Pamlico Sound) there is little variation in chemical and physical characteristics throughout its length. The river is relatively shallow and contains a spotty distribution of aquatic vegetation. The direction of water movement is subject to the vagaries of wind. Pantego Creek - is a large brackish water stream. At the point where the sample was taken the creek cover has been destroyed and a heavy layer of silt covers the bottom. This area is now a poor fishing area. Runyon Creek - This is a small turbid stream which appears to have been dredged. This stream drains a large portion of the eastern part of Washington. Cherry Run - is a small black water stream of the lower coastal plain. This stream has been deqlared a floodway by the Corps of Engineers. Cherry Run drains a large portion of the western side of town. 61bid., p. 12. 36 Ground Water With the exception ofthe supply for the town of Washington, all public and private water supplies in Beaufort County are obtained from wells. Surficial sands of Quat- ernary age and near-surface sand and shell beds of the Yorktown formation furnish water to shallow dug wells and driven wells that extend to a depth of 30 feet. A Yield of.2 to 30 gpm can be expected from shallow wells in this material. Such wells are commonplace throughout the entire county. In central and eastern Beaufort County, drilled wells obtain water from lenticular sands and shell beds in the Yorktown for- mation and from shell limestones and calcareous sands in the underlying Castle Hayne limestone. These wells range in depth,from 100 to 300 feet and yield as much as 300 gpm. The depth of.an individual well is largely determined by the area in.which it is drilled, by the.quantity and quality of water desired, and@by individual driller's preference. Several wells in central Beaufort County obtain water from the Beaufort formation. However, this aquifer is seldom utilized in the eastern and central sections of the county because of the abundance of water in overlying aquifers. Water below a depth of 30 to 50 feet in this area is under artesian pressure and flowing wells are very common. Much of the land is only a few feet above sea level and the piezometric surface is generally within 15 feet of land surface or higher. In western Beaufort County, water is obtained from the Castle Hayne limestone, the Beaufort formation, and less commonly from the Peedee formation. The relative thinness of the Castle Hayne limestone in this part of the county limits its value as an aquifer. Where large quantities of water are desired, wells must tap. the Beaufort and Peedee formations or, if tapping the Castle Hayne limestone, must be of large diameter. Yields of several hundred gallons per minute may be expected from deep wells in this area. The chemical quality of ground water in Beaufort County is notuniform. Water from the surficial sands contains objectionable iron and is generally corrosive. Water from the shell beds and impure limestone layers of the Yorktown formation is moderately hard. Water from the shell limestone layers and calcareous sand layers -of 37 of the Castle Hayne limestone is moderately hard to very hard and may contain objectionable amounts of hydrogen sulfide, particularly in the eastern sections of the county. Most of the water from the Beaufort and Peedee formations is soft, but,may be hard if the water is emanating from calcareous strata. At Washington and Belhaven, several wells yield waters relatively high in chloride. Available data indicate that the chloride probably results from a lateral.infiltration of brackish surface water,into the aquifer as the wells are pu-nped. Relocation of supply wells at a greater distance frombrackish surface waters in these @reas would result in a lower incidence of chloride content. Large supplies of ground water are available throughout the county from aquifers of Mesozoic and Cenozoic Age. Present use of ground waterin the county is only a small amount of the tot al water available.7 7Ibid., pp. 10-11. 38 ,,URBAN AND BUILT-UP LAM CHARACTERISTICS" Residential Use Since 1960 residential development has occurred throughout the area. Most development has taken place in the northern and eastern portions of the planning area, particularly in-the area of the airport to Fifteenth Street, and along U. S. Highway 264 from John Small Extension tothe edge of the Planning Area. Recent subdivision developments indicate that future develop- ment will continue in this direction. The western portion has experienced moderate residential growth while the southern portion has experienced light residential development. As pointed out in the 1970 Plan, the southern area Is largely floodplain and swampland. These areas pose severe limitations for residential development. Commercial Use The primary retail development in the CBD is located within a relatively compact area extending westward along West Main Street for approximately two and one-half blocks from the Main Street-Market Street intersection. Effort should be made to keep this development in a compact area since it functions more efficiently in this arrangement. Of all the outlying commercial areas in the planning area, only one can be described as a "planned neighborhood shopping center". The Washington Square Shopping Center is a small shopping center located on Fifteenth Street between Washington Street and U. S. Highway 17. There are several highway business areas located in the Washington Planning Area. The most easily recognized highway business area is located along U. S. Highway 17 between Ninth Street and Fifteenth. This is also the fastest -developing strip commercial area in the city. Another area which is easily 0 recognized is located north of the Tar and Pamlico River along Highway 17. 39 Probably the poorest example of a highway business area is l6cated on Highway 17 from Main Street to the Fifth Street intersection because of inadequate parking, incompatible mixture of uses and dilapidation of some structures. Other major commercial districts are located along West Fifth Street from Hackney Avenue to Wilson Street and along John Small Avenue from Eighth Street to Highway 264 intersection. These areas have developed with relatively low traffic generating secondary retail uses. Yet, caution should be taken as. future development occurs to protect surrounding residential areas from* excessive strip development. Industrial Use One concentration of industrial activity in the planning area is in the western portion of the city along the Atlantic Coast Line Railroad westof Hackney Avenue. The wholesale development along Hackney Avenue helps to serve as a buffer between the industrial activities and the residential uses to the east. A second major concentration of industrial activity is developing in the eastern portion of the city next to Runyon's Creek along Fifth Street. The expansion possibilities are limited for this area. Due to the existing inter- mixture of industrial and residential uses in this area, the major land use planning effort should be devoted to the establishment of well defined limits for the expansion of industrial activities. In addition to the two areas mentioned previously, the Hamilton Beach Corporation has established a manufacturing plant on 39.S acres of land within the planning area. It is located on N.C. Road 1509 just off of U. S. Highway 17 North. The surrounding area should begin to develop in the future due to the present plant location and easily accessible transportation facilities. 40 There has been an intermixture of land uses within the industrial districts in the Washington Planning Area in the past. Although this inter- mixture still exists, there has been an effort made toward the prevention of incompatible land uses within the-City of Washington through enforcement of the city's land use controls such as zoning regulations. Agricultural Essentially, little agricultural activity is conducted within Washington's city limits. The majority is conducted in the northern portion of the one and one-half mile area. All agricultural lands are either currently devoted to crop production or have crop production as their primary function. Forestland The most extensive areas of forestland are located in the southern portion of Washington's one and one-half mile area, These lands lie adjacent to the Pamlico and Tar Rivers. Floodplain The susceptibility of areas to frequent flooding during periods of heavy .or prolonged precipitation is an important factor in determining the location of future development in the Washington Planning Area. The construction 'of private and public structures in floodplains presents the potential loss of lives and property. Map 4 delineates Washington's flood hazard areas. Compatibility Problems and Future Implications Several land use compatibility problems have resulted in the Washington Planning Area. Some of these problems have since been addressed by strict code enforcement. Nevertheless, the following are the most frequently cited land compatibility problems in the area. 41 1. A large amount of residential development has been allowed on small lots with inadequate frontage. 2. Many existing vacant lots set aside for residential development are too small for pleasant living conditions. 3, Substandard housing conditions were created because of poor platting practices, the intermixing of incompatible uses with housing and inadequate building and housing code enforcement. 4. Many public facilities have been developed on sites too small for expansion. S. In the past, not enough land has been allocated for recreational purposes. 6. Strip and spot commercial uses have not been effectively.regulated in the past, consequently, inefficient land use patterns have been created, the traffic-carrying capacity of major streets has been decreased, and in some cases, property values have decreased. 7. Residential and manufacturing uses, not appropriate for a downtown location, located in the Central Business District. 8. Land set aside for industrial use in the past has not been suitable for industrial development. 9. Some potential industrial sites have been eliminated in the past by spotty development and the subdivision of large tracts of land into smaller haphazardly arranged tracts. As stated in problem #6 above, spot and strip commercial uses have resulted in inefficient land use patterns which have' created traffic problems. As future development occurs caution should be taken to protect the Washington community from strip development. Usually, strip development places 42 additional demands on city service facilities, and by the nature of the uses located in the stripped area, ultimate abandonment and deterioratibn of structures occurs. Strict enforcement of land use controls will alleviate many present problems from developing in the future. AREAS EXPERIENCING OR LIKLEY TO EXPERIENCE MAJOR LAND USE CHANGE Washington's urban renewal area is experiencing and will continue to experience major land use changes during this planning period. Urban renewal began in Washington, North Carolina, in 1961 with the formulation by the City Council of a Citizens' Committee to investigate the possibility of establishing an urban renewal program in the city. It was widely accepted at that time that about SO percent of.all the houses in the City limits were substandard and needed substantial repairs or demolition. After an extensive study by the Citizens' Committee, the City Coun cil formulated the Redevelopment Commission charging it with the respon- sibility of moving forward with an urban renewal program. The Redevelopment Commission, in conjunction with the City, drew up a master plan'of the City outlining the areas that needed treatment. It was agreed that this plan of attack would begin in the eastern part of the City and progress westwardly to the areas which contained the worst housing condi- tions. There were several reasons for this plan, including gaining urban renewal experience before proceeding to the worst sections of town, taking advantage of rehabilitation aide to prevent the eastern.part of the City from becoming a slum, and taking advantage of non-cash credits which accrued to the City as,a result of work already done in the eastern section. 43 In December, 1962, the East End Urban Renewal Plan was formally launched. This 42S-acre area combined slum clearance with rehabilitation. At the time, the project area comprised approximately one-third of the corporate City limits. The project met with considerable success, About 20 acres of slums were leveled and cleared land devoted to parks, recreation, and private development. Families were located in the new public housing area built to serve this relocation need. Many streets and sidewalks were paved, new utility lines were instal led, and much work, including two new bridges, was done to the Jack's Creek storm drainage basin. Many houses were upgraded through the rehabilitation program. Urban Renewal Project No. 2 was the Washington Heights Area, which was situated along the easternmost border of the City. This 45-acre area was totally cleared of deplorable housing, .some of which had no electricity or, inside toilet facilities. It was devoted to a 30-acre elementary-'school site, a 10-acre park, and 5 acres'for a portion of a public'housing project in this area, It is now one of the most attractive sections.in town. It has a school campus excelled by none in this part of the State. The third project, the Downtown-Waterfront Area, was undertaken at a. time when the City was contemplating cleaning up a run-down, dilapidated water- front containing many abandoned warehouses, dead end streets, decrepid wharfs, rotting pilings, and other run-down buildings. The intent of this plan, is so far as possible, was to create a shopping center out of the downtown area by constructing new parking lots, to rehabilitate stores,, and to better'the automobile access to the downtown area. This project is now drawing to completion.@ The waterfront area in Washington is a favorite spot for.visitors. One can travel along Stewart Parkway and view the Pamlico River. The Parkway is lined with cherry trees and other shrubs and landscaping. The latter development induced the City 44 Council to remove all off-street parking meters in the CBD. Many stores have been renovated to include rear entrances to the parking lots. The Waterfront area is often frequented by passing yachtsmen who tie up temporarily along the bulkhead area. The Main and Market Streets areas have been converted into a Semi-Mall with landscaping, more and better lights, and improved acces.s by way of numerous alleys from business districts to off'-street parking. This project has resulted in an out-of-State seafood restaurant being built in the project area, as well as a new office building and a wholesale seafood estab- lishment. Open space has been preserved along the waterfront for the benefit of the public for the years to come. With the final 'Completion of the East End and Washington Heights projects, and kith the virtual completion of the Downtown project, the Redevelopment Commis.sion and the City turned its attention to the West End area which contained the worst slums in the city. A master plan of the 170-acre project was developed, This was a Gene ral Neighborhood Renewal Plan study. The area was carved into three logical projects - West End 1, 2, and 3. West End 1 got underway early in 1970. This 40-acre project cleared the substandard houses and left the homes that could be rehabilitated through the urban renewal program. It is interesting to 'know that all the homeowners in the area who were displaced continued to be homeowners after they were relocated. Other families were moved to available housing units. Streets have been paved in the project area, and the bulk of the land was devoted to a new 82-unit low-rent housing project. However, some lots are being made available for private residential development. West End I was completed by early 1975. Some areas are experiencing commercial growth, One such area is developing along Highway 17 South across the Pamlico River. Limited 45 commercial activity is expected to continue in this area. However, any commercial development not presently zoned in this area should be cautioned in order to safeguard the area from excessive strip development. The eastern portion of the Planning Area is expected to develop residentially with supporting commercial and institutional services, As a matter of fact, a substantial portion of this area is under study for annexation. Continued development of these areas is encouraged. 46 TABLE 12 CURRENT PLANS, POLICIES,_ AND @U-GULATYNS Date Completed 1) Population and Economy 1963 2) -Comunity Facilities Plan 1963 3) Land Use Plan 1963 4) Public Improvements Program 196S 5) Zoning Ordinance 1971 6). Subdivision Regulations 1965. .7) Flood Plain Information on Pamlico River at Washington, N. C. 196S 8) Park and Recreation Study 1967 9) Neighborhood Analysis 1967 10) Capital Improvements Budget 1969 .11) Minimum Housing Element 1969 12) Updating of Land Development Plan 1970 13) Initial Housing Element .1970 14) Updating and Revision of Zoning Ordinance 1971 1S) Annexation Report 1971 16) Comprehensive Water and Sewer Study 1971 17) Community Facilities Update 1972 18) Housing Element Update 1972 19) Proposed Water and Sewer Extension 1972 20) City of Washington Reconnaissance Study 1972 21) Zoning Revised 7 June 1973 1973 22) Capital Improvements Budget 1974 23) Annexation Study 1974 24) Washington Thoroughfare Plan 1962 25) Washington Thoroughfare Plan Update 1970 SOURCE: Washington City Hall 47 CURRENT PLANS, POLICIES AND REGULATIONS Plans and Policies a) "Transportation Plans" The following transportation description is taken from the Washington Land Development Plan dated 1970. A thoroughfare plan was completed and presented to the city in.August, 1962, by the Advanced Planning Department of the North Carolina State Highway Cormission. The system of major thoroughfares supplemented by a number of minor thoroughfares will remain practically the same as those proposed in the 1962 Land Development Plan. In August, 1970, a revised thoroughfare plan was presented to the City of Washington and subsequently adopted by resolution. The major differences between the 1970 plan and the 1962 plan are as follows. Proposed Highway 264 Relocation U. S. Highway 264 has been proposed to be rerouted from Greenville to Washington by redesignation of N. C. 33 as U. S. 264. It is further proposed ,that U. S. 264 by-pass the City of Washington to the north. This by-pass will be a limited access road with interchanges at three intersections; U. S. 17, Market Street Extension, and SR 1507. Brick Kiln Road This thoroughfare is recommended to be extended from River Road north to the Intersection of SR 1SO1 and SR 1507, This road would then provide direct access to proposed U. S. 264 from the River Road and Washington Park. Right-of-way acquisition should begin about the time right-of-way acquisition for proposed U. S. 264 by-pass is complete. 48 West Third Street It is now felt that West Third Street should not be extended as a minor thoroughfare to SR 1403. Therefore, it is recommended that Third Street extend only to Plymouth Street. Consequently, Plymouth Street to West Fifth Street will become a part of the Thoroughfare Plan as a connector 'street from.Third to the main thoroughfare at Fifth Street. No right-of-w ay acquisition is thereby needed and the moving of traffic in this area is still accomplished. Washington Street Washington Street will remain a minor thoroughfar6 from Bridge Street tb 15th Street, However, a minor thoroughfare along the boundaries of the air- port might hamper future airport developmentand create a possible indirect safety hazard. Therefore, it is recommended that Washington Street not be extended to Ntrket Street Extension from lSth Street. Reed Drive Reed Drive is proposed as a minor thoroughfare in the Sma llwood area of Washington. The right-of-way has been acquired, and this area is being developed at this time. The outer loop system will begin at River'Road and the Brick Kiln Road and proceed along the Brick Kiln Road and proposed Brick Kiln Road to the intersection of SR 1SOl and SR 1507. As proposed, the loop from this point will consist of SR.lSOl and SR 1S06 following a proposed route to SR 1S09. State Road 1509 will be utilized as part of the outer loop and it is proposed that it continue across U. S. 17 to,, at present, an unspecified point where it will fork, with the western fork connecting to N. C. 33 and the eastern fork tying in With SR 1403. This proposal deviates somewhat from the 1962 Thoroughfare Plan and at this time no effort has been made to acquireright-of-way at any point along this route. 49 The 1962 Thoroughfare Plan proposed approximately three and one half miles of new right-of-way. This mileage wa s broken down into the following: 1. An extension of 3rd Street west to Clark's Neck Road. Approximately .8 mile, 2. An extension of 15th Street. west to the Whispering Pines Road. Approximately .6 mile. 3. An extension of Washington Street north to Market Street Extended. Approximately .9 mile. 4. An extension of Avon Avenue west to Market Street Extended. Approximately .8 mile. S. An extension of Hudnell Street to Twelfth Street. Approx- imately .4 mile. Since 1962 only the extension of Hudnell Street for a distance of approx- imately .4 mile to Twelfth Street has been completed, This extension connects Pennsylvania Avenue, U. S. 264, and Highland Drive. The small amount of implementation over the past eight years is more a result of a change of city policy and needs, rather,than general apathy by the city administration or physical construction which may have interfered with the 50 implementation of the 1962 plan. The City of Washington has an extensive program to upgrade existing streets to make them more functional and to provide better traffic circulation. New streets and parking areas, not mentioned in the 1962 Plan, have been constructed and are in constant use (e.g .... Stewart Parkway and the Waterfront Parking Areas). Development ju st west of the city has not been as great as was expected in 1962,, and it is not now anticipated that this area will develop during the planning period to the extent that a new road connecting Third Street and Clark Neck's Road will be justified. This propose d road, if@constructed,.would not only be costly because of topog raphy and drainage conditions, but would also duplicate the functions of the Old Pactolus Road. Therefore, this proposed road is not felt to be needed during the planning period and is eliminated in the 1970 Proposed Thoroughfare Plan. .The 1962 proposal, extending 15th Street to Whispering Pines Road, is still needed to handle the expected traffic when the comercial development along 15th Street is completed. This extensio n would eliminate some of the traffic congestion expected.along Hackney Avenue and Bridge Street. Much of this traffic congestion will be created by the Washington Square Shopping Center. It is recoimended that the city acquire the right-of-way for this extension within the next two years, Because of the potential of the Warren Airport and its future value to the city, it is recomended that the 1962 proposal of extending Washington Street to @hrket Street Extended be eliminated in the 1970 Plan. It is felt that the completion of this street would open the airport area to urban-type development and create possible safety hazards. It is the desire of the City to keep the Warren Airport area as unencumbered and as free of development as possible. No action has been taken on the proposed extension of Avon Street to Market Street Extended because this area remains in agricultural use. The City should be able to implement this segment of the Thoroughfare Plan as this area is developed. When this area does begin to develop, the pl ans for this area should be presented to the Washington Planning Board for their study and approval. By means of land use controls, now in effect for the city, the planning board will be able to guide this development to coincide with the objectives of the Thoroughfare.Plan. At this time, there is no need for this proposed street. However, as the city continues to grow in that direction, there wi 11 be a need .and therefore, it shall remain as part of the 1970 plan. It is also recommended that the city begin to.take steps to acquire right-of-way connecting Brick Kiln Road with the Slate Stone Road. Although this acquisition is not felt to be immediate, action should be taken during the early portion of the planning period. (This link will provide easy access to proposed new U. S. 264,) b) Community Facilities Plans Washington.adopted a Comunity Facilities Plan in 1963. This plan inventoried and studied existing public facilities and services in Washington for the purpose of determining the adequacy or inadequacy of thepresen t activities in meeting present and future needs before the demands became acute and the cost unreasonable. The Community Facilities Plan was updated in 1970. c) Utilities Extension Policies The City of Washington owns and operates the electrical distribution system for the City and a sizeable area of its environs. Service connections are provided free to area residents. Others must guarantee revenue equal to capital investment within a four year period. S2 d) Open Space Policies Washington has no stated policy for preservation of open space. 6) Recreation Policy Washington has a full-time Recreation Director. The current policy of the Recreation Department is to enforce its Comprehensive Park and Recreation Plan. f) Previous Land Use Studies The City of Washington has had prepared two major land use pians, the first plan in 1963 by the Division of Community Planning of the Department of Conser- vation and Development, the second plan by the Department of Local Affairs of the Division of Community Planning in 1970. The 1963 plan was deeply concerned with two major land use problems. The first problem was the Central Business District and the need to keep it as the location of the primary retail and civic activity. The 1963 plan in fact stated that this was the "key element of the land use plan.-'.' The plan envisioned that all property within the CBD would be used for commercial purposes. This, however, has not been achieved and at the present time there is still residen- tial usage within the CBD. The plan also stated need for Washington to take advant age of its unique water front CBD and make it into an "exciting" shopping area. The plan went on to state that there would be no need for a major shopping center in Washington during the planning period because the CBD would be able to provide all of the necessary retail outlets. The plan did call for, however, the development of "planned neighborhood convenience centers" at the intersection of major streets. The plan suggested that these areas should have common off street parking and limited access along with buffers to protect the surrounding residential areas. Another aspect of the 1963 plan was it's suggestion that industry@be concentrated along Hackney Avenue and south of N. C. 33. The reason for this 53 suggestion was that in this area there was plenty of transportational facilities and a majority of the industry in Washington was already located here. Light industry, on the other hand, was proposed for the area east of Hudnell Street. The major purpose in this was to give definite boundaries to an area that already had developed into a light industrial zone. The 1963 plan went into more detail suggesting development plans for residential, commercial, thoroughfare plans and many other areas. The 1970 plan built upon the basis of the 1963 plan and suggested improve- ments in areas that were found to be lacking in the 1963 plan. For example, the 1963 plan stated that "nc large scale shopping center will be required during the planning period because the location of the CBD enables it to serve the entire planning area." This proved to be a miscalculation because the city substantially increased its corporate limits to the north, It was a 0 result of this increase that the 1970 plan stated "that a shopping center will be required during the planning period". The 1970 report went on to suggest that the "center should develop on the site of the present Washington Square .Shopping Center." While the 1963 plan called for the elimination of all non-commercial uses within the CBD, the 1970 plan was more realistic by recognizing that this would be a long, slow process. While the 1963 plan called for neighborhood convenience shopping centers with control over their development the 1970 plan suggested even tighter control of these areas through the use of adequate common off-street parking areas and by limiting access into these areas consistent with traffic volumes on streets where they are located. 54 The proposed concentrations of industrial usag .e around the area west of Hackney Avenue and south of NC 33 in the 1963 plan was reiterated in the 1970 plan. The 1970 plan suggested that the individual lots in this area should be assembled into large tracts and made available to prospective industrialists. g) Prior Land Use Policies Prior to the adoption of the 1971 Zoning Ordinance there are no known land use policies governing the Washington Planning Area. LOCAL REGULATIONS a) Zoning Ordinances Washington adopted it's first Zoning Ordinance in 1971. This document regulates structure and land use in Washington and the extraterritorial area, A completely revised Zoning Ordinance was adopted in June, 1973. b) Subdivision Regulations The purpose of the City of Washington's subdivision regulations is "to establish procedures and standards for the development and subdivision of land within the corporate limits and extraterritorial jurisdiction of the city in order to promote' the public health, safety and general welfare of the community." These reg ulations, in part, are designed to secure safety from fire, panic, and other dangers, to provide adequate light and air, to prevent the over- crowding of land and a-void undue concentration of population, to facilitate adequate transportation, water, sewage, schools, parks, playgrounds, and other public requirements and to help conserve and protect the physical and.economic resources of the city and its environs. The city ordinance regulates lot sizes, block sizes, street widths, easements, sanitary conditions, and the process and data required for plat approval. The minimum lot size required by the city is regulated by the 55 zoning ordinance according to the zone the lots will be located in; however, the subdivision ordinance places restrictions on areas that do not or will not have city water and sewer. The ordinance requires that where city water and sewer are not available and individual water supplies or sewage systems are planned that the subdivider have the area investigated by the County Health Department to determine if the area is suitable for this type of use. The ordinance requires the areas tested by the Health Department have their lot size increased as the result of the percolation test and subsoil investigations dictate; however, no lot with individual systems is allowed to be less than is,000 square feet. When only individual sewage systems are planned, the ordinance requiresthat the minimum lot size by 10,000 square feet. The subdiv ision regulations also require that corner lots "shall have an extra width of 1S feet to permit adequate building setback from side streets." Along with this every lot is required to front or abut on a public street. The size of blocks are also regulated by the ordinance, The requirements are that the blocks shall "not exceed 1,200 feet or be less than 400 feet and shall have sufficient width, to provide for two tiers of lots of appropriate depth." Pedestrian ways or crosswalks are required by the ordinance where, the Planning Board deems them necessary. The city also regulates street width and location under its subdivision regulations, The streets are required to conform to the arrangement, width and location indicated on any official plans or maps for the city. In areas for which such plans have not been completed, the ordinance requires "that the streets shall be designed and located in proper relation to existing and proposed streets, to the topography, to the natural features, and to the proposed use of the land." The streets must provide for the continuation or ,appropriate projection of principal streets in surrounding areas to provide 0 for reasonable means of ingress and egress for surrounding tracts. The street 56 grades are not.to be steeper than S% nor less than 1/4 of one percent on any street without special permission from the Planning Board. c) Floodway Ordinances (Flood Zoning Ordinance) The City of Washington has adopted a flood zoning ordinance as required by the Federal Flood Insurance Program to qualify for-flood insurance. The ordinance declares that "in the interest of public health, safety, and welfare, the regulations of the floodway zone, floodway fringe zone, and the high hazard districts are intended to protect areas of the flood plain subject to and necessary for flood waters." The ordinance states the specific intent of these zones is to (1) restrict or prohibit uses which are dangerous to health, safety, or property in times of floods or cause excessive increases in flood heights or' velocities; (2) require that uses vulnerable to floods, including public facilities which serve such uses, be protected against flood damages at thetime of initial construction; (3) protect individuals from buying lands which are unsuited for intended purposes, due to flood hazard; (4) meet the needs of the streams to carry flood waters and protect the creek channels and flood plains from encroachment so that flood heights and flood damage will not be appreciably increased. The ordinance is intended to permit only that development within the floodplain which is appropriate in the light of t he probability of flood damage and presents a reasonable social and economic use of the land in relation to the hazards involved, The ordinance requires that each zone have only that type of development in it that will not be endangered in'the event of a flood. The regulations on each differ because each zone was set up to deal with a different type of problem, The floodivay zone was established to preserve the flood carrying capacity of the streams in the city. The floodway fringe and high hazards zones were established above the ten foot hazard mark or the flood-proofing of the structure. 57 The city Building Inspector is charged with the responsibility of adminis- tering and enforcing the code, Any violation of the ordinance constitutes a misdemeanor. The Building Inspector is required to give any person, firm,.or corporation a "reasonable opportunity not to exceed 30 days" to correct violations before pursuing other legal remedies. A Certificate of Compliance shall be issued by the Building Inspector as required by the city's zoning ordinance prior to the@use of any building, structure, or land and prior to the change or extension of a non-conforming use. To obtain a certificate of compliance, application must be made to the Building Inspector with the following information.: plans drawn to scale showing the nature., location, dimensions, and any existing or proposed elevations of a lot, structures, fill, storage of materials and the location of the foregoing in relation to the channel, the floodway zone, floodway fringe zone,.'high hazard district and the flood protection elevation. Any existing or proposed elevations must be tied to the City of Washington Datum or the United States Geological Survey Benchmark. The builder may be required to submit certifi- cation by a registered en i rchitect showing that the finished fill ,gineer or a and building flood elevations, flood proofing and the flood protection measures were compiled within the framework of the ordinance. Special exceptions may be granted within the floodway, floodway fringe zone and high hazard district by the Board of Adjustment as long as sufficient evidence is presented that.the structure will be protected by flood proofing or other means of flood protection elevation. An application for special exceptions shall be made to the Planning Board. The Planning Board will then forward the application along with a recommendation to the Board of Adjustment. The Planning Board -and Board of Adjustment must base their decisions on Article 3, Section 5 of the ordinance which is entitled 'Matters to be 58 to be Considered in Passing Upon Application" (for special exceptions). The basic considerations that the Boards must take into account are (1) the probability of materials. being. swept onto other lands or downstream to the injury of others, (2) the proposed water supply system and sanitation systems and the ability of these systems to prevent disease, contamination and unsanitary conditions (3) the susceptability of the proposed facility to flood damage and the effect of such damage on the individual owner, (4) the importance of the service to the community (5) the availability of alternate areas, (6) the compatibility of the proposed use with existing development anticipated in the reasonable future, (7) the relationship of the proposed use to the comprehensive plan and floodplain management program for the area, (8) the safety of access to the property in times of flood for ordinary and emergency vehicles, (9) the expected heights, velocity, duration, rate of rise and sediment transport of the flood waters expected at the site, (10) and such other factors which are relevant to the purpose of the ordinance. The city's ordinance is a detailed document covering all aspects of flood plain zoning. The city has taken appropriate measures to control future development in the flood zone and has no desire to see any duplicate enforce- ment mechanisms set up by the State of North Carolina under the provisions of the Coastal Area Management Act. d) Building Codes The City of Washington enforces North Carolina State Building Codes in addition to city building regulations. These codes set forth conditions and identify dwellings which are unfit for human habitation due to dilapidation, defects increasing the hazards of fire, accidents and other calamities, lack of ventilation, light and sanitary facilities., and due to other conditions rendering such dwellings unsafe or unsanitary, and dangerous and detrimental 59 to the Ticalth, safety and otherwise inimical to the welfare of Washington residents. p) Septic Tank Regulations The City of Washington provides municipal water and sewer to its residents. Septic tank regulations are more applicable to the extraterritorial area. These regulations are enforced by the Beaufort County Health Department-- f) Historic Districts Regulations The City of Washington does not have historic district regulations. g) Nuisance Regulations The City of Washington has adopted a nuisance ordinance which defines a nuisance and directs the steps to be taken if a nuisance occurs. A vacant lot or a parcel of land is declared a nuisance.when anyone of the-'following conditions exist: 1) "uncontrolled growth of noxious weeds or grass in excess of 18 inches or threatening to cause a hazard detrimental to public health or safety" @2) t1any accumulation of animal or vegetable matter that is offensive by virtue or odors or vapors or by the inhabitance therein of rats., mice, snakes or vermin of any kind which is or may be dangerous or prejudicial to the public health." 3) "any accumulation of rubbish, trash, or junk causing or threaten- ing to cause a fire hazard or causing or threatening to cause the accumulation of stagnant water or causing or threatening to cause the inhabitation therein of rats, mice, snakes, or vermin or any kind which is dangerous or may be dangerous or prejudicial to the public health." 4) It any condition detrimental to the public which violates the rules and regulations of the county health department." The ordinance places upon the City Manager, after he receives notification from any person that such conditions exist, the responsibil Iity of ordering an investigation by the appropriate city official. Once the investigation is made and it is determined that there is a nuisance the City Manager is then 60 required to notify the owner', occupant, or person in possession of the property in writing and "shall order the prompt abatement thereof within 10 days from the owner's receipt of such written notice." If the order is not comp lied with the City Manager "shall cause such condition to be removed or otherwise remidied!' by use of city personnel or an independent contractor. A written notice to the owner, occupant, or person in possession of the property shall be considered sufficient notice. The ordinance the n requires th at the Tax Collector prepare a statement of charges (the actual cost incurred plus a ten dollar administration fee) which is to be mailed to the owner,.occupant, or .person in possession of the property with instructions that the charges be paid within.30 days. The ordinance then states that if the bill is not paid within this time period that a lien for the amount shall be put on the land. In actuality, liens are not being attached to the property for the collection of weed control bills, due to the involv6d legal procedures required, such as running legal advertisements, calling for a public hearing, and the holding of a public hearing. h)- Dune Protection Ordinances Not applicable to the Washington Planning Area. i) Sedimentation Codes The City does not presently enforce sedimentation control. The State of -North Carolina is currently enforcing sedimentation control within Beaufort County. j) Environmental Impact Statement Ordinances While the city has no EIS ordinance, an EIS provision is included in various land use control ordinances. 61 FEDERAL AND STATE REGULATIONS The State guidelines for preparation of these plans requir e that state and federal regulations be listed and discussed. The N. C. Department of Natural and Economic Resources was to prepare such a listing and discussion for inclusion in the Coastal Area Management Act plans. However, these regulations have not been presented to date. When available these regulations will be presented for inclusion in the Washington Land Use Plan. ENFORCEMENT AND INSPECTIONS Enforcement The Washington City Inspector coordinates enforcerent of plans, ordinances, and policies.. The City Inspector Office is well organized and capable of continuing to provide effective enforcement of land use*controls. The enforcement procedure concerning the city's subdivision regulations is tied directly to the approval or rejection of the.subdivision plat. The ordinance required that a preliminary plat be submitted to the City Manager at least two weeks before consideration of the plat by the Planning Bo@rd. The City Manager will make a recomendation to the Board after he has checked to make sure the plat conforms to all city subdivision regulations. The Planning Board may accept or reject the plat but the ordinance requires that its reasons be stated in the minutes and recomendations "made-on the basis of which the proposed subdivision could be approved." Once the plat is approved or the necessary changes have been made the subdivider is required to present the final plat within three months after the approval of the pre- liminary plat. The City Council is empowered by the ordinance to either accept (totally or conditionally) or reject the final plat. If approval is given, the subdivision will have it recorded with the County Register of 62 Deeds. If the plat is denied, the City Council must state its reasons and make recommendations concerning the needed changes. Unless a plat is approved by the City Council no building permits will be issued and the plat shall be considered null and void. Inspections The City of Washington has adopted ordinances regulating housing, zoning, installation of electrical equipment, building practices, plumbing, and cooling and heating systems. Many of these regulations have been adopted by the City of Washington from state and national codes. The building code, plumbing code (with a few exceptions), and the heating and cooling system code were adopted from state codes while the electrical code was adopted from anational code. These codes are detailed and form a rather extensive body of law. The city ordinances provide for a building inspector and assistants as he has need for them. The city presently employs two full-time inspectors; one building inspector and one housing inspector. The building inspector is responsible for determining violations of the zoning regulations, the building -code, the electrical code, the plumbing code, and the heating and cooling code. The housing inspector is mainly responsible for minimum housing inspect- ions and assists the building inspector with his duties. The building inspector is charged with the responsibility of enforcing all state and local laws governing installations of electrical and cooling systems under the electric code. In enforcing the building-code, the inspector is required to "perform all the duties prescribed by the General Statutes of North Carolina and all other applicable statutes." The city plumbing code gives him general charge and supervision over all plumbing .done in the city and requires him to make certain all plumbing conforms with e the code. The Building Inspector is charged.with the responsibility of 63 administering and enforcing the zoning regulations adopted June 11, 1973. All the,ordinances enforced by the Building Inspector follow the same mechanics for enforcement and appeal with the exception of the zoning ordinance. There are three basic steps in enforcement and appeal: 1. A written notice to the property owner or his agent notifying him of the corrections that need to be made. 2. In the event the owner or his agent disagrees with the inspector's interpretation of the code, appeal may be made within 48 hours by filing.a written appeal with the City Manager stating his objections. 3. The City,Manager's decision is final except for appeal to the Superior Courtlof the County by a writ of certioriari. The procedure followed in enforcing the zoning ordinance differs from the enforcement of other ordinances in that any appeal from the Building Inspector's decision may be taken to the Board of Adjustment, the decision of which is final within the city government structure. However, one may appeal to the Superior Court of the County ghrough a,.w-rit of certiorari. In .all matters of appeal after a decision has been rendered at the highest level provided by the ordinances, the matter is turned over to the city's attorney to force compliance. The Housing Inspector received his authority from the building inspector who is allowed by ordinance to delegate the necessary authority to his assistants. The city, in response to HUD guidelines, adopted the Minimum Housing Code which recognizes that within the city there exists dwellings that are not fit for human habitation. The Housing Inspector's procedure for enforcement begins with the receiving of at least five complaints against a structure or his spotting a structure that does not meet standards. After a minimum housing inspection of a dwelling is made and it is found to be substandard, the inspector prepares a complaint and notice of hearing along with a check sheet specifying 64 the deficiencies. At the hearing the owner and/or his agent and interested parties present evidence to the housing inspector relating to the dwelling being discussed. After the hearing is held, the inspector makes a decision as to wh ether the dwelling is dilapidated or deteriorated. If he decides that the structure is deteriorated he prepares a written report stating his reasons and issues an order for the owner to bring such dwelling into compliance with the code. If the structure is dilapidated he follows the same procedure and issues an order for the dwelling to be grought up to standards or be demolished. The owner may appeal through the Housing Board of Appeals by filing a notice of appeal with the housing inspector and the Housing Board of Appeals within 10 days from the rendering of the order. The appeal must state the objections of the owner and his grounds for appeal. The Housing Board of Appeals. has the final decision unless the owner and/or his agent desires to appeal to the superior court of the county by a writ of certiorari. The Bureau of Inspections and Community Development's inspection policy is,greatly influenced by state and federal guidelines. These guidelines place the burden on.the City of Washington for finding suitable lodging for anyone who is living in a structure the city wishes to condemn or institute major repairs on. As a direct result of the great expense involved in such an operation and the shortage of adequate housing, the city makes a policy of not starting procedures against any occupied dwelling. Since the adoption of the new Minimum Housing Code in 1972 the city has demolished 68 houses and is in the process of having 19 more destroyed. During the same period 260 houses were repaired because of the enforcement authority granted in the code. 6S PUBLIC PARTICIPATION ACTIVITIES PART III 66 IDENTIFICATION AND ANALYSIS OF MAJOR LAND USE ISSUES The City of Washington undertook an intensive citizen involvement program in the Spring of 1974, The purpose of this program was to solicit local input in (1) identifying area land use problems and issues, (2) help formulate goals and objectives to address identified issues and problems and (3) to establish an on-going communication process between officials and the public. Over the past year Washingtonis Citizen Involvement Program has included: a citizen attitude questionnaire, ward meetings, public.forums, civil group engagements and establishment of a citizen "Hot-Line". Following are results of these efforts.. Problems and issues are identified, followed by goals and objectives. These long-range goals are mixed with short and long-range objectives because area problems are varied. The object- ives represent different problem-solving solutions local citizens have proposed. They address their most pressing problems:- Growth,, Environment, Housing, Public Safety, Streets and Transportation. This plan revolves around these concerns because.local citizens have identified them as problems which need solutions. It is their identification of these goals, standards, and objectives which makes them important enough to pursue. 67 GROWTH The City of Washington has experienced a, rapid population decline in the past 15 years, from 9,939 in 1960 to 8,860 (est.) in 197.5. An urban fringe has developed lacking municipal services. Additional land is needed for development, particularly for residential areas for low and middle income families. GOAL: To Promote Orderly Growth in the Washington Planning Area. OBJECTIVE: To annex surrounding residential areas. OBJECTIVE: To make provisions to extend municipal services to these Areas, such as water and sewer lines, fire and police protection, garbage and trash collection. OBJECTIVE:. To seek a detailed soils map for the City of Washington and and Beaufort County to provide information on soils limitations on development. LOCAL GOVERNMENT RESPONSIVENESS The City of Washington has attempted to build a communications process which the citizen can express his veiws and opinions of the City's needs and priorities and the'City in turn can communicate progress on these ideas back to the citizens. A responsive local government is essential to a viable democracy. GOAL: To Maintain Effective Communication Between the Citizens and Elected City Officials. OBJECTIVE: To bring* about more citizen involvement through the,Human Relations Council. OBJECTIVE: To establish closer ties with the news media. OBJECTIVE: To continue the city's public speaking panel for civic groups, business groups, and the various other citizen involvement groups. OBJECTIVE: To continue to publicize th e "hotline" telephone number which encourages citizens to give their suggestions on improving living conditions in the city. 68 ENVIRONMENTAL Washingtonians strongly feel that plans for development must be balanced with an appreciation of those unspoiled natural.areas which contribute to the "livability" of our city. These areas should be respected in our future develop- ment. GOAL: To Discourage Development of Land Which is Unsuitable for Urban Uses. OBJECTIVE: To enforce strictly the flood zoning ordinance to insure that new development within the flood zone is either flood proofed and/or elevated above*the flood plain. OBJECTIVE: To zone a historic district within the Central Business District to preserve structures of historic significance and to insure that new development will be aesthetically compatible with existing structures. OBJECTIVE: To zone the land adjacent to the Tranter's Creek watershed to prevent damaging changes in water run-off patterns and to prohibit septic tank infl,itration of surface water and under- ground water supplies. OBJECTIVE: To zone the marshland on the south side of the river to prohibit any types of use that will change the character of the land. OBJECTIVE: To annex areas that are adjacent to the river and that lack sewerage systems to ensure that septic tank inflitration does not downgrade the quality of the Pamlico River. HOUSING An aging, deteriorating housing stock is one of Washington's greatest problems, as identified through public meetings, a citizen's survey, and a survey of physical conditions. Standard housing for members of all economic groups is the first @requirement for decent, living. GOAL: To Provide An Environment In Which Residents May Have The Opportunity to Secure Adequate and Safe Housing. OBJECTIVE: To demolish all dilapidated housing units. 69 OBJECTIVE: To upgrade all substandard housing to meet minimum housing codes or else have the structures demolished. OBJECTIVE: To create a local rehabilitation loan program with the cooperation of savings and loan institutions and banks, making use of Community Development Revenue Sharing funds, RECREATION AND PARKS The 1974 Citizen Survey revealed that 50 percent of respondents never used park and recreation facilities. The non-users were primarily elderly and middle aged. Also, in a number of public meetings you pointed.out that the city and county do not fully exploit water based recreational potential. GOAL: To Provide a Variety of Recreational Opportunities for All Groups. OBJECTIVE: To plan for the renovation of the old Armory into a recreation center. OBJECTIVE: To demolish Charlotte Street Recreation Center and replace it with the renovated facilities of the old Armory. OBJECTIVE: To complete the Jack's Creek park *project. OBJECTIVE: To provide more "free play" time at recreation centers and.to allow activities to develop without structuring them into organizations. OBJECTIVE: To make better use of the Pamlico and Tar Rivers for recreational purposes by increasing city-owned waterfront property to insure areas for public access, and by providing for additional free city boat ramps and docking facilities, OBJECTIVE: To encourage more elderly and middle aged participation in recreational programs. OBJECTIVE: To develop neighborhood play areas within easy walking distance of all Washingtonians. OBJECTIVE: To study possibilities of developing a system of bike path.s. OBJECTIVE: to encourage commercial recreation such as bowling, putt-putt golf, skating rinks. 70 OBJECTIVE: To coordinate City-County activities to eliminate needless duplication of per sonnel, facilities, and programs. PUBLIC SAFETY A high degree of concern.in public safety was expressed in the 1974 Citizen Survey. It was felt that additional public safety measures are needed that address dog control, loitering, visual barriers, and increased car patrol. GOAL: To Provide The Most Effective and Efficient Means of Public Safety, OBJECTIVE: To concentrate patrolling in areas that report greatest incidence of serious crime. OBJECTIVE: To improve street lighting to promote a greater sense of security at night. OBJECTIVE: To empower police to control loitering on public property through enactment of a local ordinance, OBJECTIVE: To enact a 24-hour leash law to prevent dogs running at large. OBJECTIVI, To consolidate City-County rescue squad efforts. OBJECTIVE: To remove visual barriers from street intersections to lessen the possibility of traffic accidents. STREETS AND TRANSPORTATION Washington has numerous unpaved streets and paved streets that lack curb and guttering. Movement of traffic and water run-off patterns will be improved through increased attention to street paving and maintenance programs. GOAL: To Provide a Highly Functional Internal Street System. OBJECTIVE: To pave, curb, and gutter the remaining dirt streets. OBJECTIVE: To curb and gutter ribbon streets. OBJECTIVE: To allow traffic to flow evenly through sychronization of street lights. 71 STANDARDS The development of land within Washington should be undertaken in accordance with sound resource management principles in order to make the most economic use of public funds invested in services and to enhance private investment in the long term future of Washington. The following standards.will guide the location of development in appropriate areas and identify certain measures necessary to insure safety and,convenience for residents of and visitors to Washington. A. General Standards 1) Development should be located on stable, well-drained soils with a relatively low water table. 2) Structures should be located on the development site to avoid the destruction of natural vegetation wherever possible. 3) Structures should be located on site to avoid the alteration of natural land form and drainage where possible. 4) Development should be located to minimize intefference with established patterns of surrounding land use and to prevent conflict between incompatible uses of land, 5) Development should be located to avoid the destruction or irretrievable alteration of fragile or valuable natural or cultural resources. 6).Devel opment should not occur in areas where there is a demonstrated danger of the loss of life or property due to natural or man-made processes. 7) Development in areas subject to flooding should be designed and located to minimize the damage caused by such flooding. 8) Development should be located and timed to make the most efficient and economical use of existing or proposed public services including water, sewer, solid waste disposal, public safety, schools, libraries and social services. 72 B-. Residential Standards 1) Permanent neighborhoods should be located in sheltered areas protected from encroachment by major transportation routes and incompatible commercial development. 2) Permanent neighborhoods should maintain low density levels and large amounts of useable open space to preserve privacy and aesthetic appeal. 3) Residential development which requires septic tanks for sewage disposal should follow current health requirements as to soil type, height of water table and area to prevent pollution of ground water supply, aquifer recharge areas or estuarine waters. 4) Development which results in residential densities over 3 families per acre should be served by public or community sewage disposal systems. C. Commercial Standards 1) General commercial activities and business require locations adjacent to major thoroughfares. The uncontrolled development of commercial sites at scattered locations along highways does not promote good business, is inconvenient for shoppers, promotes inefficient use of valuable developable-land, creates dangerous traffic conflicts at each driveway entrance, and seriously impairs the capacity and function of the highway. Therefore, commercial developm..ent should be concentrated in groups of complementary uses where possible. 2) Small commercial enterprises of less than one acre are encouraged to locate where suitable sites exist among existing commercial uses in order to take advantage of combined drawing power and to increase customer convenience. 73 3) Large scale commercial developments involving one acre or more are encouraged to concentrate complementary uses on sites large enough to provide ample parking, controlled access to highways, and suitable buffering for adjacent residential use, 4) Convenience retail facilities designed and limited to serve neighbor- hood level trade areas.only may be appropriate adjacent to some residential neighborhoods if properly buffered to minimize impact on adjacent residences. 5.1 Water related commercial activity such as marinas and piers should be located in naturally protected areas as near deep water as possible where the least amount of alteration of vital marsh and estuarine bottom is required. D. Industrial Standards 1) Industries should be encouraged to locate in the Industrial District in the Planning Area. 2) Industries locating in the Washington Planning,Area should be required to provide an assessment of the impact of primary and secondary develop- ment caused by industry and should use the best available technology to avoid pollution of the water and air during construction and in .production. 74 IMPACT OF POPULATION AND ECONOMIC TRENDS. An examination of area population characteristics found in Part IT of this plan will reveal that the most significant population changes have occurred in the elderly population and the-under S age group. The SS and over age g.rouphas steadily increased while the under S has decreased. Changes in both age groups are apparently of a national trend reflecting better me dical care and health facilities, and no longer a need nor a desire for large families., What are the implications of these population changes? An increasingly older population will require specialized demands on health care and other community services. A decreasing Iunder S population represents possible future under utilization of school facilities and school personnel, When the under S population reaches school agej unless significant in-migration of school age children replenishes the losses which have already occurred, alternatives in anticipated school needs will be required. Personnel'shifts and facility re-organization may necessitate efficient school operations, Economically, an increasing old population represents a larger percent- age of residents on a fixed income. This means that persons on fixed incomes will more immediat ely reflect fluxuations in the national economy. In the past,agricultural,related activities accounted for most of Washington's economy. However, today manufacturing, wholesale and retail trade account for Washington's major economic activity. As of 1969, Washingtonians earned an average income of $2,168 annually. The area's economic outlook is encouraging. Several phosphate operations are expected to expand in the county. However, since these plans are not final, the exact impact upon Washington economy cannot be made. Continued economic and industrial development is needed to meet future employment needs., 7S PROVISION OF ADEQUATE HOUSING Washington continues to have areas of substandard housing. In 1974-a housing survey was conducted by the city. A total of 2,722 houses were surveyed. Housing conditions were as follows: (a) SS percent standard, (b) 42 percent substandard and (c) 3 percentdilapidated. The worst housing conditions arefound in the western section of the city. This section is mostly populated with Black residents. Today Washington has an average household Population of 3.26.' As popula- tion estimates are realized, overcrowding will increase, It is essential that implementation of the existing housing plan continues. Added housing stock and other housing improvement will remain high among Washington's priorities. CONSERVATION OF PRODUCTIVE NATURAL RESOURCES The Pamlico River and its waters are considered the most productive 0 natural resources the Washington Planning Area has to offer area citizens. Washingtonians have varied strong feelings concerning the protection of their natural areas as evident in their environmental goals and objectives. PROTECTION.OF IMPORTANT NATURAL ENVIROPMENTS Washington citizens seek to encourage wise development of their land and water environment in such a matter that would attract people to the area and not destroy its natural state. Their objectives "to zone the marshland on the south side of the river to prohibit any types of use that will change the character of the land, and to annex areas that are adjacent to the river and that lack sewerage systems to ensure that septic tank infiltration does not downgrade the quality of the Pamlico River 11 are some of the ways area residents feel would better conserve and protect their environment. 76 PROTECTION OF CULTURAL AND HISTORIC RESOURCES The "Original Washington" has played an important part in the development of Beaufort County and the surrounding areas. The preservation of the Old Beaufort County Courthouse and Bank of Washington are evident of the city's past cultural contribution to the area. These two buildings are listed on the National Register of Historic Places. Delineation of a historic district is under study also. These cultural and historic resources are a significant asset to the city and should be protected from unplanned and uncontrolled growth. 77 ALTERNATIVES CONSIDERED Citizen participation meetings were held with the intention of encouraging the maximum amount of citizen dialogue on municipal problems, including specific issues concerning land use planning. The principle land use questions raised were the desirable future population growth, the rate of growth, the impact of future growth on community facilities, needed improvements in municipal service delivery,and protection of the environment and of historic sites. Wa shingtonians tend to be proud of their historic heritage, their city's relationship to the river, and feel Comfortable in a small town environment. These concerns showed up consistently in their remarks. Washingtonians want a small town setting and are highly concerned about maintaining the river for rec- reation and fishing uses. Citizens consistently called for protection of their heritage through the creation of a historic zone. A great. deal of effort was devoted to determining needed improvements in municipal service delivery and in community facilities. A great deal of effort was spent in prioritizing "municipal concerns" and Washington's goals are arranged approximately in decending order.of frequency that a concern was mentioned. Public libraries, courtesy of city officials, and fire safety were not salient issues to local citizens, and so did not appear in goal statements. Citizen participation in governmental affairs tended to gather little support as a matter of greatest, or second greatest, municipal concern. In this case, however, muni- cipal policy is strongly oriented to city responsiveness and communication with 78 citizens,, and so much attention was devoted to developing goal statements on this matter. DESCRIPTION OF OBJECTIVES, POLICIES, AND STANDARDS PROCESS The citizen participation process depended on public meetings, a citizen survey, and presentations to civic groups as the three principle methods of encouraging city-citizen dialogue. A conscientious effort was made to record the items brought up at the meetings, and the citizen survey was used as the primary tool in ordering municipal concerns in a priority ranking. Also con- sidered were the prioritie's of the City's management staff and the City Coun- cil, who had been working together in the Community Development Revenue Sharing program to define municipal needs and in setting an annual budget. The goals, objectives, and standards were compiled and written up by a member of the City's staff who had been involved in the citizen participation process for both CDRS and CAMA. These statements werethen circulated to the City Manager, the City Council, and the Planning Board. The Planning Board in particular has worked to refine the goal statements. 79 STATEMENT OF PUBLIC PARTICIPATION METHODS AND RESULTS Since early spring of 1974, the City of Washington has developed a program to draw citizens into the decision making process; (1) in the preparation of the budget for both fiscal years 1974-75 and for 197S-76, with the Human Relations Council as the "vehicle" for program suggestions; (2) in the preparation of the "hold harmless" and the discretionary applicatiQns for Community Development Revenue Sharing; (3) through a series of "Workshops on Local Government" on the structure and function of the local government; (4) through the completion of a random survey of 268 households within the corporate limits of Washington concerning the needs created.by urban living; and (5) through meetings with civic groups to explore land use issues in depth. Although the meetings held on Community Development Revenue Sharing, th6 annual city budget, and the Coastal Area Management Act has slightly different orientations, they1were similar in attempting to involve the citizens in the local governmental process. The citizens' survey was a direct attempt' to go to the houses of a randomly selected group of households (10% of all households within the city limits) to gather the responses of an adult member' of the household to a series of questions on municipal problems (see: Larry Mazer and Kenneth Andrews, "A Municipality Surveys its Citizens," Popular Government, Volume 41, Number I (Summer 1975), 29.) The workshops on local. goverment were instructional in nature: a member of the city staff would present a brief explanation of his area of responsibi- lity, such as the operation of a division or department of the city. Attendees were encouraged to ask questions to improve their understanding of the city's responsibilities and methods.of operation. Other than the@State provided pamphlets,'postetso:nd public service announcements over radio and television, the city released at least one news 80 article per month to the local newspaper qj)ecAfici11v licrtai.ning to the Coastal Area Management Act. 'I'he particular route chosen to encourage pubric input into the land use planning process were presentations to civic and church groups. The slide shows on CAMA were used to acquaint,the group with the basics of land use issues with a discussion afterwards on what relationship Washingtonians desired in the future toward. the land and the water. The City administration has not been entirely satisfied with the level of response to its participation efforts. While a great deal of time and money was spent in publicizing the various meetings, the number of participants was hardly overwhelming at any single meeting. The variety of methods and the large number of meetings give citizens a great deal of opportunity to voice their views and concerns, It is difficult to estimate what percentage of the adult population participated in the process, perhaps 20% is the most believable figure. Taking into account that the public participation efforts have been an on-going process for two years, a 20%,respQnse is disappointing. 81 CONSTRAINT8 SECTION IV 82 JAM) PUITNI'TAI, .The Washington Planning Area has both man-made and natural hazard areas. Man-made hazard areas consist of tank farms, Warren Airfield, and fertilizer storAg7e facilities while natural hazard areas consist of floodplain lands. Man-Made Hazard Areas Tank Farms - There are four tank farms within the city and three within its mile and a half jurisdiction. These storage facilities contain approx- imately 1 1/4 million gallons of fuel oil. Of the four within the city two are located in the east end of town, in industrial zones surrounded by residential.usage. The remaining two facilities in the city are in the west end, one in a B-3 zone surrounded by residential uses, the other in a 1-2 zone surrounded by commercial, industrial and some ecattered residential usage. The tank farms within the city limits are all relatively close to residential areas. This unfortunate situation came into being prior to the adoption of the zoning ordinance. From the standpoint of safety, the two tank farms in the east end present the greatest potential of danger, since they are surrounded by predominantely residential land use. Three farms are adjacent to major thoroughfares (Fifth Street, Park Drive). One tank farm is located on Runyon Creek near the point it runs into the Pamlico. The location pattern of the tank farms within the city limits is quite unfortunate due to the proximity to major thoroughfares, resdiential areas, and the river. Outside the city limits, one tank farm on River Road is located in an area that is mainly commercial with some residential use to the north. The other tank farms are on a major thoroughfare, Highway 17, in close proximity to the* 0 83 to the llmnllco River. 'llic qurrounding land is comiiierciA ;iiid i@oodlmid. There are certain saf oty procedure.-, rcquired by law for tank Cinns, such as retaining walls, check valves, and fire extinguishers. The City should ascertain whether existing law provides adequate protection to the surrounding land uses. Inside City Limits 1) Greene Oil Company, 423 Hackney Avenue a. five tanks b. 74,000 gallon capacity c. Safety features: 181 long 21 high retaining wall that can hold up to 40,000 gallons 2) H. G. Winfield, 1000 Park Drive a. five 1S,000 gallon tanks, one 30,000 gallon tank 0 b. 10S,000 gallon capacity c. Safety features: no retaining walls 3) F. Ray Moore Oil Company, 304 New Bern Street a. four tanks b. 120,000 gallon capacity c. Safety features: retaining wall 4) E. P. Rhodes Distributor, 1051 E. 4th Street a. six 14,5.00 gallon tanks, two 20,000 gallon tanks b. 127,000 gallon capacity S) Waters Oil Company, 810 N. Charlotte Street a. eleven 16,000 gallon tanks, one 2S8,000 gallon tanks, one 58,000 gallon tank, one IS8,000 gallon tank b. 640,000 gallon capacity Outside City Limits 1) Taylor Oil Company, 805 River Road a. four 20,000 gallon tanks, one 8,000 gallon tank b. 88,000 gallon capacity c. Safety, features: no retaining wall, security pop-off valve 2) J. H. Pinkham EXXON Products, Highway 17 South a. five tanks b. 120,000 gallon capacity .c. Safety features: check valves on tanks 84 Warren Field Warren Field is a small airport capable of handling planes up to the size of small jets. The area is classified in 1-2 zone with special restrictions to protect flight lanes. The 1962 thoroughfare plan for the City recommended that Washington Street be extended to Market Street extension. The 1970 plan, however, recommended that this action not be taken to prevent opening the airport vicinity to urban develop- ment. It now appears that with the location of a new N. C. State Amory in the immediate vicinity, in conjunction with an expansion of the airport now underway,' urbanizing tendencies are already underway. Fertilizer Outlets Four fertilizer outlets are found in the west end of town, namely Royster Fertilizers, Smith Douglas Fertilizer, Talley Brothers Warehouse, and W. B. Gerard and Sons, Smith Douglas warehouse stores approximately 19 tons of fertilizers and fertilizer materials and 160 tons of farm chemicals. Farm chemicals are pesticides at field strength stored as liquids in containers ranging from one quart to 55 gallons, or as dry material in containers of one to fifty pounds. Any direct contact with these materials could be hazardous. In the event of a .fire, toxic fumes would be given off. Talley Brothers generally stores forty pounds of nitrogen soda, forty of ammonia nitrate, and forty of calcium nitrate. Herbicides and insecticides are not stocked but are ordered when needed. The other outlets carry much the same inventory. 85 Extraterritoria imits =mow --aft 0 =mom <3 00 Paritico P4vet MAP 4 2tor VVASHINGT N. FLOOD HAZARD A TAKEN FROM PRELIMINARY FLOOD HAZARD BOUNDRY MAP 86 FOR CITY OF WASHINGTON Natural Hazard Areas: Flood Plain "Washington has been subjected to flooding by hurricane-produced wind tides of sufficient height to cause appreciable damage at least seven times during this century including five times since Hurricane Hazel in 1954." Any type of storm is likely to raise the water level. However, to date the highest tidal flooding on record was the tropical storm of September 3, 19133, 'which produced an elevation of 10 feet above the normal water level. Based on studies conducted by the Army Corps of Engineers, a severe storm reasonably characteristic of the region could produce a storm tide of 14 feet above mean.sea level if the hurricane moved on an east-west direction along the Pamlico River. Map 4 depicts Washington's flood hazard areas. The City, with the help of the State, has tried to take steps to reduce the flood hazard. A combination street and dike has been constructed across Jack's Creek which drains 65% of the town. The dike was designed to protect the area from flood tides up to 6.5 feet in height. Four 13,000 gallon per minute pumps operate automatically when the waters behind the dike rise to sea level, and shut off when the water level drops below 1_5 feet below mean sea level. Floods in the area are caused predominantly by storm tides. Though any type of storm may cause the water level of the Tar-Pamlico to rise, only a tropicalstorm will cause a sufficient increase for serious flooding to occur. 87 'Ili--se subtropical storms occur mostly in August, September, and October. I'he highest recorded tidal flooding occurred in 1913 when a subtropical storm producedIflood waters of 10 feet., The most expensive storm thata data are available on was Ione, which in 1956 produced floods of 7.8 feet in elevation and caused $637,000.00 in damages. The Army Corps of Engineers has determined that the one hundred year flood level for Washington is ten feet. Any area which is below this elevation has been designated as a flood zone. Approximately 90% of the city lies in the flood zone. Washington has a flood zone, floodways, and a coastal high hazard zone. The floodways consist of Runyon Creek, Cherry Run, Lawson's Creek, and Jack's Creek. The designation of Floodway means that these streams will be required to provide for passage of the base flood without significantly increasing the water surface level above that of the pre-floodway condition, .Coastal high hazard areas are those areas where critical wave action is probable. The boundaries of these areas are set where the effective water depth will no longer sustain a cri tical wave (a wave three feet or above in height) or where the critical wave will be dissipated by impact with natural or man made barriers. General Soil Characteristics 'Basic to a study of long rangeplanning is a knowledge of the types of structure of the soils within the planning area. Soil should be suitable for both construction and septic fields. The.inability for a soil to handle septic tank absorption fields can create a severe public health problem. Some communities have severe sanitary problems because lots are too small and the corwded conditions cause the septic tanks to function improperly. Load bearing capacity must be considered before a new road is pl.anned or before an area is designed for an industrual site. Soils are also con- side-red with regard to suitability for camp sites, picnic areas, intensive play areas, general agriculture, woodland, and pas.tureland. (See Rap 5 and Table 13) Beaufort County lies within the Coastal Plain Soil Province, and the soils are derived from unconsolidated sands and clays of sedimentary origin composed of materials brought down from the Piedmont Plateau and Applachian Mountain regions and deposited on the sen floor in ancient times. These sediments have been more or less modified SOILS LIMITATION TABLE 89 SOIL MAP 90 by drainage, oxidation, erosion, and the decay of plants, since their elevation is above water. The percolating rain water has carried much of the finer material down from the surface, and, this, together with the action of the streams and erosion, has resulted in.the subsoils having a generally heavier texture than the surface soils. The red and yellow colors in many of the soils are due largely to the oxidation of the iron-beating minerals contained in the soil. The dar.k-grey and.black colors are the result of the decay of varying quantities of organic matter. The mottling in some of the subsoils are due largely to imperfect drainage conditions, the subsoil being saturated at such frequent intervals that the iron- bearing minerals in the soil have been only partly oxidized., The elevation and drainage in different parts of the County have caused considerable difference in the soils. All of these factors acting upon the original material have produced a number of different soil and varied soil conditions. Th e soils are grouped broadly into soil series, the soils of each series being similar in origin, color of the surface soil, color and structure of the subsoil, and in topography and drainage. The soil series are divided into soil types on the basis of texture. Seven soil series including fourteen soil types are recognized in Beaufort County. Each soil series is named for the major soil series within the association. Five soil series are found within the City of Washington and its extraterritorial jurisdiction, and are as follows: Lakeland Chipley: This soil association is excessively to somewhat poorly drained, with sandy-soils occuring on nearly level gently sloping terrain. This association occupies about S% of the County. The areas are narrow and long. They are mainly along the Pamlico River; from Bonnerton south along N. C. Highway 306 to the Pamlico County line; from Acre Station north along N. C. Highway 32 to the Washington County line; and from Pinetown north along State Road S06. 91 Lakeland soils make up about 45 percent of the association. They are excessively drained sands more than 60 inches thick. The Lakeland soils occur on the higher ridges within the association. Chipley soils make up about 35 percent of the association. They are some- what poorly drained sands more than 60 inches thick. The Chipley soils occur on the lower ridges within the association. The rest of this association is made up of Maxton, Dragston and Osier soils. About half of this association is cultivated or pastured, and the remainder is forested. The soils in this association are fairly well suited for the production of tobacco, peanuts, corn, soybeans, small grain, and pasture. Below average yields are obtained from corn and soybeans. Coastal Bermuda pasture is fairly well adapted to the Lakeland. However, Ladino clover and Fescue pastures are not as well suited on the Lakeland soils. They are easily tilled and respond well to lime and fertilizer. The major hazard in this association is two-fold. The Lakeland soils are susceeptible to wind erosion, are very low in fertility, and are droughty. The Chipley soils have a wetness hazard. The major soils in this association have only moderate limitation for septic tanks filter fields, foundation footings for large buildings (three stories or less), camp sites, and picnic areas. Nearby water supply may be contaminated in the Lakeland soils. This association is one of the best sources of sand for the building trade. LYNCHBURG-GOLDSBORO-DUNBAR: This association consists of moderately well drained to somewhat poorly drained soils occurring on nearly level to gently sloping terrain. These soils have a sandy surface and a friable sandy clay loam to a firm sandy clay subsoil. This association occupies about 7 percent 92 of the County. The area is small and occurs throughout the County. A Large area is in the southwest part of the County along N. C. Highway 102, State Toads 1152 and 1154, and south along U.S. Highway 17 to the Craven County line. Lynchburg soils make up about 35 percent of the association. They are somewhat poorly drained soils having a friable sandy clay loam textured subsoil with its clay content varying from 18 to 35 percent. Color of the subsoil is yellowish brown to brownish yellow, with gray mottlings appearing throughout the subsoil. Permeability is moderate. Goldsboro soils make up about 25 percent of the association. they are moderately well drained soils having a friable sandy clay loam texture subsoil with its clay content varying from 18 to 35 percent. Color of the subsoil ranges from yellow to yellowish brown, having gray mottlings appearing 20 to 30 inches from the surface. Permeability is moderate. Dunbar soils make up about 20 percent of the association. They are somewhat poorly drained soils having a firm sandy clay textured subsoil with its clay content varying from 35 to 45 percent. Color of the subsoil varies from brown- ish yellow to olive yellow, with gray mottlings appearing throughout the sub- soil. Permeability is moderately slow. The rest of the association is made up of minor amounts of Duplin, Dragston, Craven, Lenoir, Coxville, and Rain soils. Over half of this association is cultivated or pastured, and the remainder is forested. The moderately well drained soils in this association are well adapted to growing tobacco, peanuts, corn, soybeans, and pasture. The somewhat poorly drained soils are not as well adapted to tobacco and peanuts, but are better for the growing of corn, soybeans, small grain, and pasture. Soils in this association are easily tilled and respond well to lime and fertilizer. The major hazard in this association is wetness. 93 The major soils in this association have a moderate to severe limitation for septic tank absorption fields, and slight to moderate limitation for camp. sites', picnic areas, and intensive play areas. LENOIR-CRAVEN-BLADEN:. This association consists of moderately well to poorly drained soils occurring on nearly level to strongly sloping ridges (0-15 percent). These soils have a medium textured surface and a very firm clayey subsoil. The association occupies about 20 percent of the County. Three large areas are located in the County. One area is located in the north- west part of the County; another area is east and northeast.of Washington; and the third area starts at the Pitt County line going east along U. S. Highway 264 to Chocowinity and to Cox's Cross Roads. Lenoir soils make up about 40 percent of the association. They are some- what poorly drained soils having a yellowish very firm clayey subsoil with gray mottlings throughout the subsoil. Clay content in the subsoil is more than 45 percent, Permeability is slow. Craven soils make up 3S percent of the association. They are moderately well drained soils having a yellowish very firm clayey subsoil with gray mottlings appearing 20 to 30 inches from the surface. Clay content is more than .45 percent. Permeability is slow. The Craven soils occur on the stronger sloping ridges in the association. Bladen soils make up about 15 percent of-the association. They are poorly drained soils having a gray very firm subsoil. Clay content is more than 45 percent. Permeabili ty is slow. Bladen soils occupy the nearly level or depressed areas in the association. The rest of the association is made up of minor amounts of Duplin, Dunbar, Coxville,, Othello, and Rains soils. 94. A lit tle over half of this association is cultivated or pasture, and the remainder is forested. The soils in this association are suited for the produc- tion of tobacco, peanuts, corn, soybeans, small grain, and pasture. The somewhat poorly drained soils are better suited for the growing 'of corn, soybeans, small grain, and pasture. The soils in this association are fairly easily tilled and respond well to lime and fertilizer. The major hazard in this association is erosion on the stronger slopes and wetness on the nearly level slopes or depressions, The major soils in.this association have a moderate to severe limitation for septic tank absorption fields, public sewerage system, camp sites, picnic areas, a@d intensive play areas. BLADEN-PORTSMOUTH-BAYBORO: This association consists of poorly to very poorly drained soils occuring on nearly level or slight depressions-, Surface texture ranges from fine sandy loam to mucky loam. The subsoils range from friable sandy clay loam to very firm clay, This association occupies about 50 percent of the County. There are two large .areas located in the County. One is northeast of Washington in the J & IV Swamp and eastward and then southwardly to the Pamlico River only to have other small areas of different associations cut it by way of ridges and streams. The other large area is located South of the Pamlico River; East of U. S. Highway 17, eastwardly along the Craven County line to the Pamlico County line; thence northeasterly to Goose Creek. Bladen soils make up about 30 percent of this association. They are poorly drained soils having a gray very firm clayey subsoil with its clay content more than 45 percent. Permeability is slow. Portsmouth soils make up about 20 percent of this association. They are poorly drained soils having a black surface and a gray friable sandy clay loam subsoil. Clay content varies from 18 to 35 percent. Permeability is moderate. 95 Bayboro soils make.up about 17 percent of this association. They are 40Y poorly drained soils, having a black surface and a gray very firm clayey subsoil. Clay content is more than 4S percent. Permeability is slow. The rest of this association is cultivated or.pastured, the remainder is forested. The soils in this association are suited for the production of corn, soybeans, small grain,. and pasture. They are easily tilled and respond well to lime and to fertilizer, The major hazard in this association is wetness.. The major soils in this association have a severe limitation for septic tank absorption fields, public sewerage system, camp sites, picnic areas, and intensive play areas. SIVAMP-ALLUVIAL-WET: This association consists of poorly drained to very poorly drained soils on nearly level to slight depressions having a surface texture range from loamy sand to loam. Texture of the subsurface layers ranges from loamy sand to clay. This association comprises about 2 percent of the 'Rounty. -It occurs throughout the County in narrow long strips, mostly along the major streams and drainage ways Swamp soil makes up about SO percent of the association. They are poorly to very poorly drained; soil.materials are mixed alluvial deposits ranging from loamy sand to clay. They are under water most of the time. Alluvial land, wet soils make up about 40 percent of the association. They are poorly drained; soil materials are mixed alluvial deposits ranging from loamy sand to clay. They are flooded part of the time, Alluvial land, wet soils are usually located in the smaller drainage ways or between the swamp soils and soils of higher elevation. The remainder of the association is composed of minor amounts of Bladen, Hyde, Bayboro,.Portsmouth, and Marshland soils. 0 96 Almost all of this association is forested, mostly hardwood or cypress. Osoils in this association'are not well suited for cultivation because of the high water table and flooding hazard. They are principally used for wildlife. The major soils in this association have a severe limitation for septic tank absorption fields, public sewerage system, camp sites, picnic areas, and in- tensive play areas. Summary Analytically considering the soils in their natural state in Beaufort .County, only the Lakeland-Chipley soil series will give fair support to septic tank absorption fields. This is a meager 5 percent of the County area. The Lynchburg-Goldsboro-Dunbar soils series is poorly suited for septic fields. This soil is but 7 percent of the County area. All other soil series are unfit for septic fields unless proper treatment is applied. Significantly, only the same 12 percent of the County is recommended by the soil characteristics to be presently suitable for urban and light industrial development. The p roblem soils of the County can, of course, be intensively developed through major earth work, proper drainage, and pile-supported foundations. A prime example of this renewal of land is the Texas Gulf Sulfur-.Lee Creek Mining Complex. The complex was developed on the Lenior7Craven- Bladen soil series and it is.j today, the County's most attractive industrial site. it should also be noted that in a particular soil series are found isolated soil types that can and will support such items as septic field. A soil always occurs in its customary location such as ridges, slopes, low areas, etc. Therefore, within a particular soil series which, for example, is poorly drained, there will occur a property of the terrain which is unique to that area, such 97 as a ridge. On a ridge will occur a completely different soil series characteristics) from the soil series that is surrounding it.8 It is recommended that the City of Washington contract with the U, S. Soil Conservation Service for a detailed soil survey, which would provide valuable information, measurements, and interpretations of such significant data as; porosity and percolation rates, drainage, ponding, flooding, run-off, depths to bedrock and water tables, bearing strength, shrinkage, and swelling', corrosion, frost action, erosion, etc. Without such a study Washington does not have a realistic interpretation of urban land-use suitability. In turn, improper construction and development in the future could occur causing 9 unnecessary costs to the City and the public. Water Supply Areas The provision of water and sewer services and facilities serves two functions in the development of an area. They are: (1) meeting needs of existing development; and (2) influencing-future growth, Meeting needs of existing development usually receives primary consideration in planning. However, the major importance of water and sewer systems in comprehensive planning is their use as a tool for influencing growth patterns. An examina- tion of existing water and sewer service areas will identify potential growth areas. The City of Washington supplies water to residents within its city limits and to three industries within the extra-territorial area. Washington's major water supply comes from Tranter's Creek which is located 8Comprehensive Water and Sewer Study: Beaufort County, IV, C, Rodman'Land, Surveying and Civil Engineering (1971), pp. SI-61. 9Washington Park and Recreation Stu4y, N. C. State Department of Conserva- tion and Development, Di ision of Community*Planning (Feb. 1967), p.. 29. 98 six miles northwest of the city. The secondary source of water is at Clark's Neck. Since most of the watershed lies beyond the city's planning area, county-city cooperation is imperative. Caution should be taken by preventing high density residential growth and septic tank uses in these areas. Map 6 shows Washington's major water supply areas. Steep Slopes The Washington Planning Area does not have slopes that exceed1twelve percent. FRAGILE AREAS Inappropriate or poorly planned develop ment can easily damage or destroy fragile environmental areas, These areas are as follows: Coastal Wetlands .Washington's coastal wetlands lie across the Pamlico River in the sou thern portion of the extraterritorial area. This area is essentially undeveloped and should remain so. Outer Banks Sand Dunes Not applicable in the Washington Planning Area. Ocean Beachesand Shorelines Not applicable in the Washington Plaruiing Area. @Estuarine Waters The part of the Pamlico River that flows within Washington's mile and a half planning jurisdiction is considered an estuary. These estuary waters can be protected by controlling development along the Public Trust Waters of the Pamlico. 99 WASHIN6--r-qr,j BEAUFORT COUNTY NORTH CAROLINA MAP 6 WATER SUPPLY AREA' (WATERSHED) Public Trust Waters The Pamlico and Tar Rivers which flow through the southern portion,of the Washington Planning Area are identified as public trust waters, These waters are also classified as "Class C and Class SCII waters according-to the N. C. Stream Classification System. Map 7 depicts these classes. "Class C11 water uses are limited, For example, these waters may be used for fishing, boating, etc, However, "Class C" waters are not to be used as a source of water supply for drinking, culinary or food-processing pruposes. These waters are suitable for fish and wildlife propagation. Similarly, "Class SCII waters are suitable for fishinc, and other usages except bathing or shellfishing for market purposes. These waters are also suitable for fishing and fish propagation. Quality standards applicable to Class C and Class SC waters are found in the Appendix. Complex Natural Areas The Coastal Resources Commission may determine that there are co .mplex natural areas within the Washington Planning Area, Complex natural areas are defined as lands that support native plant and animal communities and provide habitat conditions or characteristics that have remained essentially unchanged by human activity. Washingtonts extraterritorial jurisdiction south of the river adjacent to the river may possibly meet the requirements of complex natural area. If so, this area should remain essentially in the same state it is today. Areas Sustaining Remnant Species No areas sustaining remnant species have been identified in the Study Area. 101 moop WANOW o its ago-* 9 0 ater r tr a -tv, c L- J 5MW M .-MIMS R1 Ex errito 7 WASHINGT N AT 10 STREAM CLAS CLASS C CLASS SC 102 Areas Containing Unique Geologic Formations Areas containing unique geological formations have not been identified in the Study Area. Registered Natural Landmarks There are no registered natural landmarks located in the Washington Planning Area. Archeologic and Historic Sites Washington has 2 properties listed on the National Register of Historic Places, the Bank of Washington and the old Beaufort County Courthouse. In addition, the Division of Archives and History, N. C. State Department of Cultural Resources, has put in motion a survey of historic property and has tentatively delineated a historic district which is approximately equivalent to the downtown section of the city. In order to keep maximum control of the composition of this area in local hands, the City will propose to create a historic zone, Any new development within the downtown will be required to conform to the "nature" of the existing structures. AREAS WITH RESOURCE POTENTIAL Productive Agricultural Lands Lands devoted to agricultural purposes are primarily in Washington's extraterritorial area. These lands will be encroached upon by future develop- ment. Urban development should be directed to sites other than these .productive agricultural lands. Mineral Sites Thereare no known mineral deposits in the Washington Planning Area. 103 Publicly-Owned Lands and Other Non-Intensive Outdoor Recreation Lands Washington's parks and recreation areas comprise,approximately 50 acres. The Recreation Department administers recreational activities at the following sites: 1. Seventh Street Park 2. Charlotte Street Center 3. Kugler Field 4. Todd Maxwell Field .5. Stewart Park 6, Oakdale Park 7. Washington Docking Facilities 8. JackIs Creek 9. Budge Street Center 10. Beebe Park 11, Carver's Landing 12, Haven's Garden 13. Water Tank Property Area Privately Owned Wildlife Sanctuaries There are no privately owned wildlife sanctuaries in the Washington Planning.Area. 104 CAPACITY OF COMMNITY FACILITIES Existing water and sewer service areas are shown on Map 8. Water and Sewer Service The City of Washington operates a water and sewage treatment plant under the Department of Public Works. The major water supply comes from Tranter's Creek. This creek is located six miles northwest of the city, At this point, the creek has a minimum daily flow of eight million gallons per day, The substation,has two pumps: one 1600 gpm, and one 1900-gpm. This assures that maximum capaci.ty of the cast Iron pipe line to the substation can be utilized during peak periods or whenever necessary (2100 gmp at 100 lbs, pressure is peak capacity.) The secondary source of water is at Clark's Neck, where the city has a 1600 gpm pump. This water is not always useable, however, due to thehigh salt.content of the water. The water plant was constructed in 1955.and has a capacity of 2.2 million gallons per day, The average daily demand on the plant is only 1.3 mgd which allows a safety margin of approximately 25%. The water is pumped from the reservoir by two electric pumps, one is a 1000 gpm pimq.) and the other is a 2000 gpm pump The water f lows through a 1211 main to a distributing system and el evated tank simultaneously. The elevated tank has a capacity of 300,000 gallons and was built in 1939, An additional 500,000 gallon elevated tank and a 500 gallon per minute well was constructed in 1975 at Slatestone Hills. There will be a small water treatment plant there also having a 500 gallon per minute capacity which will serve primarily to remove the iron contentof the water. This new construc- tion will give the City more down time to allow for needed maintenance at the other plant, 105 itoria lm its avow --"% Extraterr . . . ....... *74 V, SEWER TFALLI 4 Painuco P,@ve"L MAP 8 r to" VVASHII%JGT N. L IS SERVICE AR -AS WATER. SEWER BOTH 106 The city's plant employs complete primary 'and secondary treatment of sewage. Approximately 95% of the area within the city limits is presently served by the system. The sludge from the sewer is pumped into drying basins where it decomposes into lumps and is available for use as fertilizer, The plant itself was constructed in 19S9 and the daily flow is approximately 1.1 to 1.3 million gallons. The plant is designed to process 2.2 mgd as a sec- ondary treatment plant. At present, the plant's B. 0, D. level is around 79%. Although there is no service to residents outside the city limits, service. has been extended to three industries, The city bills these industries forthe service at the rate of 7S% of the water bill, Normally a system uses gravity for flow, but in Washington, the basically flat topography requires that sewage be collected at several points and be pumped to the treatment plant, Table 14 shows water and sewer plants capacity figures and percent utilized. TABLE 14 WATER AND SEWER PLANTS Date*Constructed Capacity Operating Level % of Capacity Water Plant 19SS 1,3 mgd 75% Sewer Plant 19S9 1.1-1.3 mgd 7S% There is a total of 55 miles of water lines ranging in size from 2" to 16 The 2" lines are totally inadequate and are in the process of being -replaced with 811 asbestos cement pipe. Virtually 100 percent of water usage is metered. In summary, the present water and sewer waste treatment facilities needs upgrading in order to provide adequate service for future development and the ten year (1985) projected population growth. Plans are underway for these 107 improvements. A 201 Facilities Study which is being coordinated by the City of Washington will determine the most feasible methods of water and sewer waste treatment. Transportation (Primary Roads) The provision and maintenance of an adequate and efficient transportation system will be of'extreme importance to the future development of the Study Area. A transportation system consisting of not only highways and streets, but bus, rail, air, etc, as portions of the system. Three major highways run through the Washington Planning Area, They are: U.S. 17, U.S, 264, and Highway 33. U.S. 17 is part of the North Carolina truck highway system which has the function of moving large volumes of inter- state traffic through.local traffic. U.S. 264 is part of the truck feeder system which carries moderate to high volumes of traffic over shorter distances. N.C. 33 is part of the state rural collector system which carries mainly local traffic. Table gives the design capacity and percent utilization of primary roads in the Study Area. Primary Roads The design capacity and percent of useage figures were developed from data supplies by the N, C. Department of Transportation, The design capacity data was derived from charts provided by Mr. T. L, Waters, @,Ianager of Planning and Research, Department of Transportation, Raleigh. Design capacity is based on land width, location, and the state average for that type of road. The actual useage figures were compiled from traffic counts furnished by the District Engineer of the Department of Transportation for the Washington area. These figures are shown in Table 15. 108 TABLE 15 PRIMARY ROADS Washington Planning Area Roads Width Capacity Use % Bridge (bet. River and Sth) 57 2S.,000 13,SOO S4% Carolina 44 15,500 9oo 61% Third 44 Hackney (Sth 17) 18 3500 ISth (Market-17) 48 18,000 61200 34% isth (Market-264) 44 l NC 33 (Hackney to Whispering Pines Rd.) S2 18,000 9X0 SO% NC 33 (Whispering Pines to Mr Ed's) 68 18,000 61800 37% Market (3rd-Sth) Market (Sth-15th) 34 8,340 SP600 67%. Sth-Pennsylvania 40 14100 9,80 69% Highland Drive 48 8,340 3OO 41% SOURCE: N. C. Department of Transportation Other portions of the Washington transportation network inc lude rail, trucking, bus, and air service. Railroad service for the City of Washington is provided by the Seaboard Coastline. From their terminal in Washington, Seaboard can connect with other railroads servicing all areas of the United States and Canada. At the present time Washington handles both incoming and outgoing traffic of about 1200 cars per month. There is a daily (except Sunday) run of one freight train. Washington has no passenger service. 109 Washington is served by two trucking lines; Barnes Truck Lines and Estes *Express Lines, Incorporated, Barnes Truck Lines has its home base in Wilson, N.C. and serves all eastern North Carolina. Estes Express Lines is a Richmond, Virginia,based firm and services all of Virginia, North Carolina and northern South Carolina. Washington is.s.erved by Seashore Transportation Company and Carolina Trailways Bus systems. Seashore is a local company based in New Bern with its primary function being to serve the marine installations at Camp Lejeune and Cherry Point. They also have direct.connections at Jacksonville, Raleigh, .Rocky Mount to Trailways and Greyhound, The Carolina Trailways Bus Service is a Raleigh, North Carolina base company which is Associated with Trailways which has nationwide service, A charter bus service is also available at the Washington Bus Station. Warren Field is operated by the Airport Commission whose seven members are appointed jointly by the City of Washington and Beaufort County, The air field was built by the United States Government during World War 11, and sub- sequently turned over to the City and County governments. The air field has 3 runways. Two are 5,000 feet long and thus suitable for small jets., One runway is lighted. There is a radio beacon installed in 1971 that transmits on a low frequency of 288 megahurts. There is no tower but pilots can contact the airport office for informal advise on local weather conditions. There are 6 closed T hangars and Do open T hangars. Charter planes and crop dusting units are based at the air field. The air field averages about 40 landings a day, The heaviest users are local industries that have planes based there, such as National Spinning, Hackney, and Green Oil Company. Hamilton Beach, Dixie Yarn, Texas Gulf, Bethelehem Steel, American Synamid, and Weyerhaeuser use the field but do 110 do not have planes based there, Washington does not have public transportation plans. Public transportation is one of-the most costly services local government can provide. Although a public transportation need may exist, the existing population may not be.able to support a municipal transportation service, In summary, implementation of local transportation plans will require the City Council and other governing bodies within Washington to work closely with the N. C. State Department of Transportation, and with Washington and Beaufort County Planning Boards. Only through such coordination will safe, adequate and efficient transportation systems be afforded the citizens, businesses, and industries within the area. Schools Total enrollment figures demonstrate the strain placed on the des-ign capacity of the existing schools: 1974-75 School Year Design _Capacity Enrollment % of Use Eastern Elementary 936 7S9 98.1 John Cotton Tayloe Elementary 559 5S7 99.6 John Small Elementary 6SO 641 98.6 P. S. Jones Junior High 1,050 1@038 98,9 Washington High 1,072 843 78.6 Obviously four out of five schools are operating at capacity, although average daily membership would fall below total enrollment and would.therefore lessen the daily enrollment burden. In addition to the public system there is a private school, Pamlico Community School, with an approximate enrollment of 27S, which-has grades K through 12. City Hall The present.facilitynow being utilized as City Hall is a two story structure located on Market Street halfway between Main and Second Streets.. The building was originally constructed circa 1884 as a fire station but has been renovated for use.as a City Hall, Additional office space for city administration is provided in the "old county jail house" adjacent to present city hall facility. Police Protection Residents are provided police protection by the Washington City Police within city limits and the Beaufort County Sheriff's Department is the extra- territorial area. The Law Enforcement Center is located at Third and Respess Streets. Washington's Police Department has the following breakdown of personnel ,allocations for fiscal year 1975-76: one (1) Chief Police, two (2) Captains, five (5) Sergeants, one (1) Sergeant-Detective, thirteen (13) Patrolmen, and one (1) Records Clerk-Despatcher. A part-time patrolman enforces parking regulations, Fire and Rescue The Washington Fire Department is manned by 19 full time firemen, 7 call company firemen who are compensated on a monthly basis for their part-time service-, and 30 volunteer firemen, The volunteers are divided into two pLmper companies and one ladder company, each hav ing a. Captain and an Assistant Captain.. The volunteer firemen are provided with 40 to SO hours of training per year in fire fighting techniques. The full-time firemen train three hours per week and also train with the volunteers. The department has a modern communication system which is linked with Oother fire departments throughout the County. The department's internal 112 communication system'has 16 paging units.which the firemen and call company Oersonnel carry attached to their belts, allowing the men to be called back to the-station anytime by signal; 20 phone alerting systems link volunteer to station, as do,2 way radios on all trucks. Records are kept of the condition of the equipment, fire hoses, and fire hydrants. All hose and every hydrant is tested every year, the hydrants for water pressure. The service area of the fire department includes the City of Washington and neighboring residential development outside the City limits for which Beaufort County has supplied a truck with a three minute water capacity and a payment to allow the City to hire 2 firemen to man it. The ability to suppress fires in the County, which lacks a water system, is virtually impossible from point of view of a three.minute water supply. Fire protection is offered by contract, renewable annually, to County Oindustrial'and connercial establishments. The City of-Washington Park contracts its fire service needs with the City of Washington at a nominal fee yet obtains fire service protection equivalent to that received by the residents of Washington. The City has a mutual aid agreement with surrounding communities to render aid in case of a large fire. The rescue squad is composed of those firemen, call company personnel, volunteers, and hospital staff who have completed the 81 hour Emergency Medical Technician course, as required by State law, As of sunuer of 1974, 3S men had received this training and passed the necessary exam. The training requirements have placeda considerable burden on the time of those taking the E.H.T. course: None received any compensation for the 81 hours. A fall off in "volunteerism" n the community has placed an increasing burden on full-time personnel for 113 both fire and rescue service. The financial burden of continuing "adequatell Wre and rescue services i .s considerable. Fortunately the County government seems willing to cooperate in sharing these costs. Greater coordination of hospitals in the county and their ambulance services with the same service provided by the various cities is a matter of crucial concern for effective service and efficient use of public expenditures. Medical Facilities Washington's medical needs are served by the Beaufort County Hospital. This hospital, which was opened in.May of 19S8, has a staff of 24 physicians, 41 registered nurses,-78 licensed practical nurses with 181 beds (only 150 are in use) and IS bassinets. Beaufort County Hospital, like other similiar institutions throughout the state, receives contributions from the Duke Endowment Fund which is based on a formula taking into consideration the &umber of medicaid patients and bad debt losses. This-figure amounts to 75@ per day for welfare and nonpaying patients. The hospital operates an ambu- lance,service for which it receives a contribution from the county to under- write loss. Other than these two contributions the hospital has been self supporting since 1959. In addition to its major function of caring for the sick, the hospital operates-its own two year training school for X-Ray Technologist with two -students per year. The hospital serves as a practical training center for the School of Nursing and School of Laboratory Assis-tance.of Beaufort County Technical Institute, as well as its association with medical training facilities at East Carolina University. 114 Libraries 0 -There are three Libraries which serve the Washington Planning Area:' (1) The Brown Library, (2) The Beaufort-Hyde-Martin Regional Library and (3) The I.. B. Turner Library. The I. B. Turner Library is under the general suDervision of the Beaufort-Hyde-Martin Regional Library and is a part of that system while the Brown Library is for the city residents and is not affiliated with the regional library system. Brown Library The Brown Library is the main library for the City of Washington and is located on Van Norden Street between Main and Second Streets. Th e library was constructed in 1953 from funds provided by the estate of George H. and Laura E. Brown. The estate continues to contribute annually to its operation. The library operates by receiving funds from the Brown Estate, the city, Bewafort 0ounty, gifts from private individuals, and overdue book fines. In addition to the customary book service, the library has a large meeting room, a career room for the high school students, an interlibrary loan service and a movie projector and -projection room. Beaufort-Hyde-Martin Regional Library The Beaufort-Hyde-Martin Regional Library primarily serves the rural residents of the counties included in its name. Due to the regional nature of the system it is hard to evaluate its effects on Washington residents. The main library of this system is-pTesently located in the old Beaufort County Courthouse. The library which serves as base of operation for twelve branch libraries is stocked with 51,000 volumes, ISOO records and 350 pieces of art. The primary function of the main library is the operation of bookmobiles and administration of the tri- unty system. IThe I. B. Turner Library, located on W. Ninth Street, was once called the I. B. Turner Library for Negroes. It is now a branch of the Beaufort-Hyde- Martin Regional Library and is used extensively by local residents. The City of Washington contributes approximately 50% of its yearly budget. The library is mainly geared to kindergarten through grade school students. There are story'hours, charts, records and pictures that help introduce students to learning resources of the library. Recreational Facilities The City ofWashihgton has three main recreational buildings: Seventh Street Recreation Center, Bridge Street Recreation Center, and Charlotte Street Recreation Center. In addition, there is a small building adjoining Oakdale, Cemetary which is used for arts and crafts classes. Charlotte Street was constructed in 1934 and has received nominal repair and maintenance since then: the building is structurally unsound and should be demolished. Charlotte Street property adjoins the current N. C. National Guard Armory, which the City and County will acquire jointly once the new Amory has been completed. Extensive renovation may be necessary for conver- sion of the facility to recreational uses. Seventh Street Recreation Center, completed in 1972, is in the vicinity of Washington High School and, so is conveniently located for students after school hours. Seventh Street Recreation Center houses the administration of the parks and recreation department. Bridge Street Recreation Center was completed in 1962 and is found in the predominantly black section of town. The City has approximately 50 acres of parks, which is inadequate according to NRPA standard,: approximately twice this acreage is needed for a City Washington's size. 116 According to the City Recreation Director, Washington's existing recreation plan is currently being implemented. The plan identifies potential land to be used for recreational purposes and presents proposals for open space and recreation areas which are substantiated by a more in-depth study than can be'entertained in this plan. In November, 1969, a $22S,000 recreation bond issue was passed by the voters of Washington. As a result of the bond's passage, the city will be provided with a new gym at Bridge Street, renovation of all present recreation areas, and a new central recreation facility. These were all recommendations of the Park and Recreation Study. All indications are that the city will continue to follow the recommendations of this study during the pl anning period. It is further recommended that the city obtain control of that area of land south of the Pamlico River directly across from.the downtown waterfront area for'open space and recreational purposes. This same area has been identified as a potential regional park development.@ This area would provide an ideal location for a municipal marina, for instance, and relieve the congestion at the present municipal boat launching area on Runyon's Creek. Not only would the city and its citizens benefit from a large recrea- tional area in the city's "backyard,'! but the aesthetic value of-the river would be maintained and would complement the aesthetic value of the city after completion of the downtown waterfront urban renewal project. The proposed park and recreational development along Jack's Creek is in progress at.this time. This development will tie in to and complement the .proposed new central recreational facility to be located between Fifth and Seventh Street along Jack's Creek. 117 Sanitation The Sanitation Division of the Public Works Department is responsible for residential garbage collection, trash and limb collection, commercial refuse through the dumpster container system, and the street sweeper. This division consists.of -two residential garbage'trucks which collect garbage behind the resident's house twice a week. There are also two trash and limb trucks working the same schedule as the garbage trucks.' These men only collect refuse that has been placed near the street. The front end loader, Dumpmaster type truck, is operated by one employee working mostly at night with little supervision. There are a total of 217 dumpster containers throughout the City which this truck empties twice a week, with the exception of those of schools and the hospital which are emptied three times a week. The City has just recently purchased a new 31 cu. yd. Dumpmaster *Uck. The dumpster containers are available in four, six, and eight cubic yard capacities. Businesses that do not generate enough re fuse to justify the use of a four cubic yard container may share with another business. A business may purchase contai ners from the city or rent. All trash and garbage is dumped at the Beaufort County Landfill which started its operation in February, 1974. Prior to this, the City operated a landfill of its own. The City must comply with State regulations concerning the covering of the old dump during fiscal year 1975-76. This will require a major expenditure for dirt, hauling it to the dump site, spreading it to a,depth of 611 and planting a grass cover. The dump is leased and will one day revert back to its original ,I@ners. Decomposing organic matter yields me thane gas which would seep to the 118 surface through the ground cover and form potentially dangerous underground gas Ockets. Tile future land use of such a site will be quite limited. The most appropriate use will be open space with few or no buildings. Storm Drainage Providing an.adequate storm drainage system in Washington is made difficult by the fact that the topography is very flat with few natural drainage outlets. In order to compensate for this lack of elevation, Jack's Creek, the major outlet, has been dammed and its water level maintained at approximately one foot below sea level. When the water in the creek rises above this level four-13,000 gallons per minute pumps operates automatically to pump the excess water into the Pamlico River. If the elevation of the Pamlico River becomes lower than the elevation of Jack's Creek, water will flow by gravity into the river through flood gates. This system is capable of handling a 2 inch per hour rainfall. Approximately 7S percent of the town's area is dra ined by waterways feeding into Jack's Creek. The remainder of the city drains into Kennedy's Creek, Runyon's Creek or directly into the Tar and Pamlico Rivers. Waterways consist mainly of open ditches with some storm sewer pipes carying water beneath the streets. Telephone and Telegraph Telephone service in Beaufort County is provided by.the Carolina Telephone and Telegraph Company and the Tri-County Telephone Membership Corporation. The Carolina Telephone and Telegraph Company maintains exchanges in Aurora, Bath, Belhaven and Washington. The Tri-County Telephone Membership Corporation has exchanges at Pike Road, Pinetown, and Sidney Cross Roads. Direct distant diling is in use throughout the County. Carolina Telephone and Telegraph services provide 11,601 telephones, while Tri-County Telephone Membership Oompany serves 900 telephones in Beaufort.County. 119 Western Union provides telegraph service in.lVashington and Belhaven. Electriciy The City of Washington owns and operates the electrical distribution sys- tem for the City and a sizable area of its environs. The system is regional in scope in that its power lines extend along major highways in some areas for twenty-five (25) miles. The system serves communities as-distant as Pinetown, Terra Ceia, Bath, Bayview--on the east end, and Latham on the west end. The system is under the supervision of the Director of Electric Utilities who is responsible to the City Manager, Electric utilities is comprised of a Distribution Department with two (2) line crews, one (1) underground service crew, and a right-of-way crew, and lastly, a meter department. Electric utilities employs thirty four (34) men on a full-time basis. The Ci.ty purchases 12.S KV and 34.S KV power from Virginia Electric and Power Company. The 12.5 KV energy is utilized at the delivery point.. The 34.S KV energy is transmitted across town and is converted to 12.5 KV power for distribution. The maximum capacity of the present bank of VEPCO transformers is 25,000 KVA for the 12.5 KV energy, and 20,000 KVA for the 34.5 KV energy. The combined capacity is 4S,000 KVA for the entire system, excluding National Spinning. National Spinning is being served on a separate 40,000 KVA trans- former along with Belhaven, The system reached a historic peak demand of 37,907 Kilowatts with a monthly average of 32,000 Kw. The demand is expected to continue at an accelerated rate of approximately 15%, subsequently requiring increases in VEPCO's transformer capacity within the next year. Under the present agreement with VEPCO, the City's load growth is to be at 34.S KV. Provisions also include maintaining the existing 12.S KV trans- 120 formers within a ma@ximum load of 2S,000 KVA. By December 31, 1978, the City has contracted with VEPCO to receive one voltage at 34.5 KV at which time all conversion to 12.5 KV distribution must be accomplished by the City's own transformers. If this agreed upon date is not complied with, VEPCO will apply an additional monthly facility charge. The conversion from 34.S KV to 12.5 KV distribution voltage is being implemented in the following steps: 1) Spider Web 34.S KV to the substation on Pennsylvania Avenue and provide capacity of 7,SOO KVA, 2) Spider Web 34.5 KV to'the substation on Fifth and Respess Streets with capacity of 10,000 KVA. 3) Increase capacity at the Forest Hills substation. 4) Purchase 34.S KV/12.S KV in the power plant substation to complete conversion for one voltage delivery from VEPCO at 34.S KV. It is recommended.that an increased percentage of Electrical Revenue be turned back into the system to increase the transformer capacity of the sub- stations in addition to rebuilding feeder lines, increasing wire sizes, improving voltage regulation, and converting the inadequate 2.4 KV distribution lines to 12,S KV distribution. This system has.had a doubling of load within the past five (S) years. The deficiencies mentioned require correction for present load conditions and future load growth. 121 ESTIMATED DEMAND PART V 122 POPULATION The method employed in computing Washington's Extraterritorial Area Oulation project-ion is similar to the method used to project,the city's population growth. That is, an extraterritorial housing count was multiplied by the area's average household size. This gave the extraterritorial popula- tion. By dividing the township population by the extraterritorial'population the percent of total Planning Area population residing in Washington Township was determined. This rate was then applied to the township projections through the year 2020. Again, this method makes the basic assumption that short-term future population changes will be more similar to short-term past changes. Table 46 depicts conservative population projections. Annexations, continued industrial growth, etc. will have a positive impact on future popula- tion growth. However, due to a lack of knowledge, these variables cannot be quantified at present. - r Population Projection As shown in Table 16 Washington's population is projected to increase from its present 8,860 to 9,738 by the year 1985, The total Planning Area is projected to contain a population of 13,441 by 198S. Consideration s Taken Into Account In Preparing Ten-Year Projections Seasonal population changes are those which affect the city during certain months. Examples of seasonal pop ulation changes are the influx of migrant farm workers and the influx of tourist and recreation oriented people. Traditionally these are the only seasonal population changes that would have any affect on the city's stable population. These increases are considered to have an impact in the Washington Planning Area. The major implication to the City of these increases is that there will be some level of increased services, such as water and sewer services required to serve these people. Similarly, as services increase so Oes the cost of providing these services. 123 Unfortunately there is no base data available to make a quantitative assessment of seasonal population changes. Due to this lack the only valid statement concerning seasonal population changes is that there are increases and.these increases will result in some cost. Relationship_ of Long-Term Projections to Desires of the People I The long term projections shown in Table 16 reflect local desires to maintain a steady and orderly growth pattern in the Washington Planning Area. Local residents also feel that these projections are consistent with their resources to provide supporting services. S.1 10, 2S__and 50 Year Projections The City of Washington should experience a population growth of 12,300 by the year 2020 while the total Planning Area should reach 17,220. These projections are shown in Table 16. Examination of Seasonal Population and Economic Impacts As the Planning Area increases in population and as society becomes more leisure oriented, seasonal populations will play a significant role in the Washington Planning Area. This becomes even more apparent when one considers the abundant water-oriented recreational opportunities in and around the Washington Planning Area. Today tourist and,motorist travel along scenic Highway U. S, 17 con- tributes-to the areals'economy. An investigation of several local motels indicated that between June and August occupancy rates increased, One motel cited a ninety-five (95) percent capacity during these months. I t is assumed that these travelers and other vacationers contribute not only to the city's motel businesses but also to gasoline, food, and similar businesses. However, it is anticipated that this impact will be reduced with the completion of I-9S within the next five to ten years. 124 TABLE' 16 POPULATION PROJECTIONS City of Washington and Extraterritorial Area 1980 2020 1980 198S 1990 2000 2010 2020 Wash. 9,S28 9,738 9,947 10,117 113,12S 12@300 *a 13,lSl .13,441 13,730 13)965 IS,S7S 17,220 SOURCE: N. C. Department of Natural & Economic Resources, based on Department of Administration projections for Beaufort County and Washington Toivnship. 125 TABLE 17 POPULATION TRENDS Washington Township and City of Washington 1940 - 1970 1940 1950 1960 1970 Washington Township 12,195 13@792 13,906 12@3S4 City of Washington 8.*569 9,698 9,939 8@961 Percent of Total 70.3 70,3 71.5 72.S SOURCE: U. S, Census of Population, 19SO and 1970, 126 TABLE 18 POPULATION PROJECTIONS Beaufort Coun@L and Townships 1970-2000 I Change: 1970-2000 1970 1980 199-0 2000 Number Fe-rcent Beaufort County 35,980 36P800 38,SOO 39,400 3,420 9.5% Bath Township 3,237 2@940 2,810 2,610 - 627 -19.4% Chocowinity Township 4,661 4@780 5,000 5,090 429. 9.2% Long Acre Township 6,976 7@560 8)840 10,050 3,074 44.1% Pantego TownsLp S,lM 4,960 4,910 45,720 - 406 7.9% Richland Township 3,626 31130 2@940 2,680 - 946 -26.1% Washington Township 12,3S4 13@420 14@010 1472SO lX6 15.3% 1These are' actual U. S. Census of Population figures for the year 1970 rather than a projection. SOURCE:, N. C. Department of Administration, Office of State Planning, based on OBERS, study. 127 ECONOMY RmufactuTing, wholesale and -retail trade now couprise the major segments of Washington's industrial corposition. As for future growth patterns, N. C., Phosphate has announced plans in the next few years to build a $220,000,000 plant to exploit the cotmty's phosphate deposits used in the production of fertilizer. Th is industry will potentially enploy 600 people. In addition, Texas Gulf is ex- pected to add substantially to its operations around Aurora, and may increase its payroll by 50% within four or five years; capital investment could double within the same period. F.M.C. (Food Machinery Coppany) may begin mining on property it owns on the north side of the river. No one has yet made any kind of accurate prediction when this might happen or on the number of people it might employ. These statements relating to the phosphate industry are closely tied to the market for fertilizer in the coming decades. Even should these plans materialize, there is no strong reason.to suspect that their growth will increase the popula- tion or industrial base of the city. In fact, substantial growth in the county may accelerate the tendency for people to move out of the city into the county, further weakening the city's population base. Wholesale and -retail trade grew substantially in the sixties, but the work force actually declined for both males and females. Therefore, a continuing growth in sales may not necessarily lead to the employment of more people in that area. Any effort in the future to attract more industry should concentrate on high- er paying industries that require a skilled work force. 128 FUTURE LAND NEEDS The previous section of.this study briefly discussed future projections of population and economic.changes which the city may experience. This section will evaluate these changes as.they may affect the following activities: Residential, commercial, and industrial land uses.. Residential Land Use The aforementioned projections suggest that population increases are anticipated in the Washington Planning Area. Vacant lands suitable for residential purposes are limited within city limits. However, ample suitable residential lands are found in the extraterritorial area. Furthermore, city policy will be to annex urbanizing areas around its borders, and provide them with municipal services such as water and sewer lines, police and fire protection, etc. Recent residential developments in the extraterritorial areas suggest there are no problems associated with development in these areas. Generally, soil conditions in projected growth areas are moderate. A significant factor regarding new residential activity is the form which this activity will take: multi-family units, single family units, and/or mobile home units. It is assumed that most residential activity will be allocated between the traditional single family house and mobile homes. Recent developments in the North Market Street Extension area reflect a single family unit trend while development in the Whichard Beach area reflects a mobile home trend. While residential development is occurring in other parts of the Planning Area, the aforementioned areas reflect a very noticeable trend. In addition, if present economic conditions remain, it may also be assumed that the trend toward mobile home development will continue and increase in the future. 129 Commercial Land Commercial activity is broken into two categories, the Central Business District (CBD) and outlying commercial areas. In the CBD land presently being used for non-CBD uses will be.absorbed by commercial expansion. Although the CBD area will continue to expand, it is expected to be a slow process. There will still be non-CBD uses located in the CBD area at the end of this planning period. As a result of CBD expansion, additional buildings (those non-CBD uses) with adequate space to accommodate future commercial development will be made. Perhaps the greatest CBD asset is the potential to utilize its waterfront location. As stated in the 1970 Land Development Plan, this location offers certain unique advantages which, if properly exploited, could make this one of the most exciting shopping areas of eastern Carolina. Full utilization will require a complementing effort on the part of the downtown merchants to capitalize on the potentialities the waterfront affords the,downtown shopping area. As residential areas develop in the future, it is recognized that shopping areas will develop to serve these residential areas. The exact location, of course, will be determined by the residential development. Since most residential development is projected within the extraterritorial area these commercial activities are also projected to occur in these areas, It is recommended that shopping areas be developed as planned convenience shopping centers, Ample suitable land is available for such development in the extraterritorial area. Industrial Land Washington presently has approximately 1,S25 acres of land zoned for industrial purposes (heavy, light, and limited). Developed industrial land 130 now co mprises approximately 1SO acres of all developed land in the planning area. The most noticeable industrial area lies on the edge of the Planning Area west of the City between the Atlantic Coast Line Railroad and N. C. Highway No. 33. Continued development is recommended in this area because of the transportation facilities available, and suitable topography, Other developed industrial areas are located north of U. S. Highway 17 and west of the airfield. Light industrial activity has developed in these areas. In summary, the Washington Planning Area has ample land to accommodate additional industrial growth during this planning period, COMMUNITY FACILITIES DEMAND The Guidelines for Land Use Planning in the Coastal Area require that con- sideration. be given of basic facilities needed to service estimated growth. The future development and demand for community facilities is important to any municipality due to the capital expenditures necessary to provide such ser- vices. Since a 201 facilities plan is under study, this section does not use ten-year population projections to determine sewer and water facilities demand. However, it is noted that the present waste treatment facility is inadequate and would not provide needed service demands in the future. Sewer As previously stated, the Department of Public Works is currently having a 201 Study done which will provide a detailed analysis of the sewer system and pro- ject its needs.over a 20 yea r period. The present system has a design capacity of 2.2 million gallons per day and is operating at an average 75% of capacity. During periods of heavy rainfall, the system operates at over 100% of its capacity while during "normal" periods, it operates at around 80% of its capacity. The recommendations of the 201 study will be the basis of Washington's future expansion of its sewer system. These recommendations will take into account projected popu- lation increases for the-next 20 years and how best to meet the needs of Washing- ton and the surrounding area. 13,1 Water The City of Washington is in the process of completing a new well and water treatment plan. A new elevated tank capable of storing 500,000,gallons has re- cently been completed. The well will have a capacity of about 600 gpm and the treatment plant will have the same capacity. Before completion of this project the city had a-system capable of producing 2.25 million gallons per day. With the addition of the well and treatment plan, the city will be able to process 360,000 additional gallons per day. Storm Drainage The City of Washington lies in a very flat area and has few natural drainage outlets, making the problem'of providing adequate storm drainage extremely diffi- cult. Jack's Creek, which drains approximately 75% of the town, would need more equipment than it presently has to handle the runoff of future developed areas that drain into it. Ihere would be a need to install additional pumps with approxinately.50% more capability on the dike at Jack's Creek. The area between Brown Street and the purflps should be dredged to allow for more -retention room. The city at present can handle the equivalent of 4 inches of rain per hour for a 20 minute period. Refuse Collection and Disposal Tlie City of Washington Sanitation Department has had to deal with a large increase in the number of collections due to the opening of the public housing project on 9th Street.' As a result, the additional population will require another crew and packer. Fire Protection At the present time, the Fire Department has the necessary facilities to serve the Washington Planning Area. 132 The department operates on response time. Any area that is not within ade- quate range of the*station cannot .be considered to.have the necessary fire pro- tection no matter how excellent the crew or equipment. To retain a class VI insurance rating, it is necessary for the Washington Fire Department to have its first pumper on the scene within 2 minutes. By 1985 Washington will have growm by approximately 600 acres. A substation in the eastern annexed areas will cost approximately $100,000. Additional staff and equipment mist be taken into account. The American Insurance Association sets requirements for the adequacy of water systems. These requirements are based on averag@ conditions found in com- munities of various sizes. Accordingly, the required fire flow is shown as follows in Table -19 Presently, Washington with a 1975 population of 8,860 has two pumping 0 stations with a combined pumping capacity of 33 50 gpm. If population projections are realized by 1985, Washington w ill have a population of 9,738 Thus, re- quiring approximately 3000 gpm - meaning Washington's Fire Department will be provided a more than adequate fire flow capacity. Police Protection As the town pursues its annexation objective, an increase in geographic boundaries will occur necessitating additional patrol cars and personnel. Today, Washington employs 22 patrolmen. A minimum of 2.0 uniformed officers per thou- sand is recommended for police protection. The "2.0 uniformed officers per thousand population" means that two uniformed officers for every thousand re sidents should always be on duty. Thus, the present level of police employment should be maintained and possibly increased during this planning period. 133 TABIE 19 REQUIRED FIRE FLOW Required Fire Flow for Average City, Duration, Population 9PM mgd Hours 1,000 1,000 1.44 4 1,500 1,250 1.80 5 2,000 1,500 2.16 6 3,000 1,750 2.52 7 4,000 2,000 2.88 8 5,000 2,250 3.24- 9 6,000 2,500 3.60 10 10,000 3,000 4.32 10 13,000 31500 5.04 10 17,000 4,000 5.76 10 Source: Standard Schedule for Cities and Towns of the United States with Reference to Their Fire Defenses and Physical Conditions (New York: American Insurance Association (National Board of Fire Underwriters), 1956 ed.) 134 CARRYING CAPACITY OF LAND A specific issue regarding future growth and development concerns the capability of land and water to sustain these changes, The carrying capacity of an area means the amount of life a stable ecosystem can support. Although an ambiguous definition, the issue requires that planning must take into consideration the physical limits at which certain levels of human activity lead to undesirable alterations in the environment. In the coastal area these detrimental effects are caused particularly by sewage and waste water disposal. The effects are noted in both ground and surface water quality; both then. act as a physical limitation upon development. These physical limita tions are fully developed in this land development plan under the topics of "constraints" and "significant land use compatibility problems-which have implications for future land use," The "estimated demand" section also notes these limitations. The primary problem is caused by poor soil conditions, which are not conducive to on-lot disposal techniques. 'Specifically, the problem is that the soils in the Washington Planning Area either do not perk due to a high water table.or, the soils perk too fast, not having an opportunity to remove toxic wastes. Then these wastes are transmitted to adjacent bodies of water ,ultimately causing degradation of water quality. Although the present conditions may not be causing serious water quality problems, the implications are magnified by potential increases in both population and economic activity in the Washington Planning Area. The City of Washington is located in a "capacity use areW@-an area where ground water and surface water must be monitored as required by the State of North Carolina. According to records kept over the past few years, the p-eak daily usage figure was 1.9 million gallons per '.day on August 5, 1975. On a per capita bas.is, this usage amounts to 214 GPD. 135 (This figure is inflated since we cannot account for the total number of visitors in the area at that time, The National average is 150 GPD.) The city's population projections are as follows: 1980-9,528; 1985-9,738; 1990-9,947; 2010-11,125; and 2020-1 2,300. Using the inflated per capita figure of 214 GPD during the ten year planning period (1975-1985) we would be drawing up additional 188,000 GPD during the periods of highest consumption, Total draw-down would amoung to approximately 2.1 million GPD, well below the allow- able 3 million. For the year 2020, the peak usage figure for a population of 121,300 would amount to 2.6 million GPD.. As previously noted, Washington presently obtains its.water supp ly from the Tranterts Creek Watershed, Draw-down from the watershed area is expected to drop accordingly following the projected opening (April, 1977) of a 500 GPM well east of Washington in the Slatestone Area, As a result the city is moving from a total reliance on surface water-supplies to a partial reliance on ground supplies. 136 GROWTH AND FACILITIES COSTS The provision of adequate facilities and services to meet future growth will be a major responsibility of city government. Therefore, the cost implications of growth and'development must, be fully understood. It has been determined that the city's present.wastewater collection and treatment system does'not provide adequate service. As development and industrial growth occurs service demands will increase resulting in both capital and personnel needs. At the minimum an adequate waste treatment facility would cost.approximately $1,000,000 in local matching funds. in addition, the city can expect an increase in refuse collection and disposal. Additional personnel and capital needs could amount to approximately $S1,000. By 1985 Washington will have grown by approximately 600 acres. What effect will that have on present fire protection capability? A fire sub-station in the eastern annexed areas will be needed to provide efficient fire protection. A sub-station will cost approximately $100,000. Additional staff and equipment must also be taken into account. These needs and improvements will total over $1,ISI,000. The City of Washington will probably not be able to finance all of these improvements. Therefore, every possible federal, state, and local source should be explored. For example, the city should seek revenue sharing money providing these funds are available. Participation in the Federal Housing Program and Comamity Development Program should continue, Other possible sources could come from a city bond referendum and/or tax increases. A financial commitment from city government and the city's people will be necessary. In summary, the cost discussion contained herein has been to provide a" insight into the future needs of the Washington Planning Area. The City should remain cognizant.of the need for various community facilities and should 137 continue to maintain an up-to-date inventory Of the Factors, which generate these needs. Specific functional plans, e. g., capital improvcmonts plans and a capital improvements budget should prepared in order that the adequate provision of community facilities may be provided, 138 PLAN DESCRIPTION PART VI 139 LAND CLASSIFICATION MAP 140 DESCRIPTION OF THE LAND CLASSIFICATION SYSTEM The Land Classification System Map is a general graphic depiction of the manner in which -future development in the Washington Planning Area is expected to occur. Previous discussions have attempted to address, in specific details, future land use demands and constraints. The Land Classification System as outlined in the."State Guidelines For Local Planning In The Coastal Area..." is divided into five,areas: developed, transitional, commmity, rural, and conservation. The following is a general description of each land classification. a. Developed--Lands where existing population density is moderate to high and where there are a variety of land uses which have the necessary public services. These lands are delineated in "solid rust" on the Land Classi- fication Map. All lands within Washington's city limits are classified as Developed. FUNCTION AND STANDARDS Developed lands will provide the service and growth centers for the Planning Area. They are intended to accommodate the greater portion of the necessary and natural expansion of residential, commercial, and industrial activities. The needs of Washington's permanent population for housing, recreation, commercial activity, social and professional services will be met in these areas. The building inten- sity in developed areas will allow the economic feasibility of a high level of pub- lic and institutional services. Continued development and redevelopment is en- courated to provide for the orderly growth in this area. 141 b Trans i tion--Lands where local government plants to accommodate modera.te to high density development during the following ten year period and where neces- sary public services will be provided to accommodate that growth. These lands are delineated in "hatched rust" on the Land Classification Map. Washington's transitional lands are located adjacent to developed lands bordering city limits. Included in these transitional lands are areas currently under study for annexation. Secondary transitional lands are shown in the southern Dortion of the planning.area across the Pamlico._Aiver, Although commercial and residential growth is expected in these areas, the city is not making a commitment to extend municipal water and sew6r. FUNCTION AND STANDARDS Transition lands will provide for moderate intensity development in areas where development will not significantly harm relatively tolerant natural 'resources. These areas are designed to provide for residential expansion and growth and to accommodate uses related to and compatible with -residential uses in the vicinity of developed lands where utilities and comm-mity services can be most economically and readily provided. Development and the -required services and utilities will be at a generally less intense level than in developed lands. C. Community--Lands where low density development is grouped in existing settle- ment.s or will occur in such settlements during the following ten year period and which will not require extensive public services now or in the future. There are no lands classified as Community in the Washington Planning Area. Neverthelesss the following functions and standards are provided in.the event that areas may develop which meet the Community classification requirements. FUNCTION AND STANDARDS The commmity lands will provide for low intensity development opportunities at levels that will protect the natural resources of the Planning Area and still allow orderly growth and development. These areas will primarily provide residential opportunities for peimanent residents. Public services and utilities-will not be available in these areas at as high a level as in the developed and transi- tional areas.. d. Rural--Lands whose highest use is for agriculture, forestry, mining, water supply, etc., based on their natural resources potential. Also, lands for future needs not currently recognized. These lands are delineated in "white". These lands are located primarily in the northern portion of the Planning Area. FUNCTION AND STANDARDS Rural lands'will'provi-de areas for the long term management of productive re- sources within the Planning Area. Building construction, residential and related, supporting development should occur only on large lots in relatively smiall clusters on carefully selected sites. Public services and utilities in these areas will be limited to support only those uses which are conpatible with the concept of conservative resource utilization. The rural classification willalso provide large areas within the Planning Area to serve as a buffer against inconpatible uses of land to serve future land needs which cannot be anticipated. e. Conservation--Fragile, hazard and other lands necessary to maintain a healthy natural environment and necessary to provide for the public health, safety, or welfare. Conservation lands are depicted in "Dot Green: on the Land Classification Map. These are land areas with the Washington Planning Area where development must be restricted because of an inherent incapability of the land to support development because of fragility or hazardous conditions or because the natural resources represent a greater value than that of devel- opment. 143 FUNCTION AND STANDARDS There is sufficient land suitable for development in the Planning Area to accom- modate projected and desirable growth without infringing upon areas which are unsuited for development. The classification of conservation lands will direct development away from areas which cannot support intensive development, where public services are not and should not be made available, and direct it in- stead to more tolerant are-as where services can be supplied more economically. These areas are also designated to identify characteristics which represent a potential hazard to development such as flood and erosion. These hazard.factors increase the public.and private cost required to support development. PROJECTED POPULATION GROWTH ALLOCATIONS Projected population allocation to Transition and Rural land classes re- flect local desires for orderly growth. Area residents feel that the most desir- able residential areas lie within the extraterritorial area. The stated objective "'to annex surrounding residential areas" also re-flects orderly growth desires. @Ibst lands within the city are either developed, not for sale, or unsuitable for development. Thus, leaving anticipated new residential growth to'occur in the extraterritorial area. GROSS POPULATION By classifying land and allocating population densities the local govern- ment can more efficiently budget and plan comunity facilities such as water and sewer systems, roads, etc. The Planning Area's Land Classification System depicted by Map is consistent with local desires and reflects local conditions, By 198S Beaufort County and the City of Washington should reach populations of 38,460 and 9,738 repsectively. Washington, the county seat, is expected to capture much of this growth. 144 Assuming these population projections are realized, Washington will have increased from its present population of 8,860 to 9,738. This represents an increase of 878 people, The majority of this growth is expected in the city's transitional areas. In conclusion, there are enough lands classified to accommodate Washington's projected 10 year growth., 145 POTENTIAL AREAS OF ENVIRONMENTAL CONCER11 PART VII 146 eAREAS OF ENVIRONMENTAL CONCERN The major goal of the Coastal Area'Management Act is to create a balance between growth and environmental protection. The Washington Planning Area contains a number of fragile areas that would be destroyed or seriously altered in nature if unplanned, uncontrolled development should occur. Watershed The Tranter's Creek watershed provides the City with its source of raw water supplies. Most of the watershed lies beyond the city's planning area. With the help of the County, the City must safeguard its water supply by preventing high,density residential growth and septic tank use in these areas. Estuarine Waters The part of the Pamlico River north of the Railroad bridge that flows within Washington's mile and a half planning jurisdiction is considered an estuary. These estuary waters can be protected by controlling development along the Public Trust Waters of the Pamlico, Estuarine and River Erodible Areas As applicable to the planning area, these waters are the Pamlico and Tar Rivers. Estuarine and river erodible areas are considered to be that area extending from the mean water level or the mean high water level along the estuary, sounds and rivers a distance of 75 feet landward. 147 Complex Natural Areas The Coastal Resources Commission may determine. that there are complex natural areas within the Washington Planning Area. Complex natural areas are defined-as lands that support native plant and animal communities and provide habitat conditions or characteristics that have remained essentially unchanged by human activity. Washington's extraterritorial jurisdiction south of the river adjacent to the river may possibly meet the requirements of complex natural area. If so, this area should remain essentially in the same state as it.is today. Public Trust Navigable Waters State Guidelines for Local Planning under CAMA state that areas such as water- ways and lands under or flowed by tidal waters or navigable waters, to which the public may have rights of access or public trust rights and areas which the State of North Carolina may be authorized to preserve, conserve, or protect under Article XIV, Section 5, of the North Carolina Constitution. The Pamlico & Tar Rivers, are considered Public Trust Navigable Waters. Navigable has been defined as follows: capable of being navigated in its natural condition by the ordinary modes of navigation including modes of navigation used for recrea- tional purposes. The natural condition of a body of water for purposes of deter- mining navigability shall be the condition of the body of water at mean high water or ordinary high water as the case may be, and the condition of the body of water without man-made obstructions and without temporary natural obstructions. Tem- porary natural conditions such as water level fluctuation and temporary natural obstructions which do not permanently or totally prevent navigation do not make an otherwise navigable stream non-navigable. Some factors considered in identifying Public Trust Navigable Waters were: (1) the use,ofthe body of water by the public and (2) the length of time the public 148 has used the area. The.Pamlico and Tar R ivers meet the description of PublicTrust Ovigable Waters and are thus identified as such.. APPROPRIATE LAND USES OF AEC's 1. Resource Areas Watersheds "Ttante&'z Cteek" Policy Objective. To insure the continued maintenance of water quality and quantity of the surface water supply. Appropriate Land Uses. Appropriate land uses shall be those consistent with the above policy objective, i.e., uses with little or no discharge of,pollutants which.would endanger ground water. Estuarine Waters "Pamtico RiveA" Policy Objective. To preserve and manage estuarine waters so as to safe- guard and perpetuate their biological, economic and aesthetic values, Appropriate Land Uses. Appropriate uses shall be those consistene with the above policy objective. Highest priority shall be allocated to the conservation of estuarine waters. The development of navigational channels, the use of bulkheads to prevent erosion, and the building of piers or wharfs where no 0 149 other feasible alternative exists are examples of land uses appropriate within estuarine waters, provided that such land uses will not be detrimental to the biological and physical estuarine functions and public trust rights. Projects which would directly or indirectly block or impair existing navigation channels, increase shoreline erosion, deposit spoils below mean high tide, cause adverse water circulation patterns, violate water quality standards, or cause degrada- tion of shellfish waters are generally considered incompatible with the manage- ment of estuarine waters. 4.. Complex Natural Area "Pameico Rood Axeal' Policy Objective. To preserve the natural conditions of the site so as to safeguard its existence as an example of naturally occurring, relatively un- disturbed plant and animal communities of major scientific or educational value. Appropriate Land Uses. Appropriate land uses shall be those consistent with the above policy objective. Lands within the AEC shall not be planned for uses or kinds of development that will unnecessarily jeopardize the natural or primitive character of the natural area directly or indirectly through in- creased accessibility. Additionally, lands adjacent to the complex natural area should not be planned for additional development that would unnecessarily endanger the recognized value of the AEC. The variability between kinds of com- plex natural areas and between land uses adjacent to those natural areas means that the range of permissible uses and intensity of use must be carefully tailored to the individual area. 5. Public Trust Navigable Waters "PamZico and TwL Riveu" ISO Policy Objective, To protect public rights for navigation and recreation and to preserve and manage the public trust waters so as to safeguard and perpetuate their biological, economic and aesthetic value. Appropriate Uses. Appropriate uses shall be those consistent with the above policy objective. Anyland use @7hich interferes with the public right of navi- gation, or other public trust rights, which the public may be found to have in these waters, shall not be allowed. The development of navigational channels, drainage ditches, the use of bulkheads to prevent erosion, and the building of piers or wharfs are examples of land uses appropriate within public trust -waters provided that such land uses will not be detrimental to the biological and physical functions and public trust rights. Projects which would directly or indirectly block or impair existing navigation channels, increase shoreline erosion, deposit spoils below mean high tide, cause adverse water circulation patterns, violate water quality standards, or.cause degradation of shellfish waters are generally considered incompatible with the management of public trust waters. 6. Estuarine and River Erodible Areas "Pamlico and Tar River" Policy Objective. To insure that development occurring within these areas is compatible with the dynamic nature of the erodible land thus minimizing the likelihood of significant loss of property. Appropriate Land Uses. Appropriate land uses shall be those consistent with the above policy objective. Permanent or substantial residential, commercial, insti- tutional or industrial structures are not appropriate uses in estuarine and sound and river erodible areas unless stabilization has been achieved along the affected reach. Recreational, rural and conservation activities represent appropriate land uses in those erodible areas where shoreline protective con- struction has not been completed. 151 SUMMARY PART VIII 152 DATA ASSEMBLY, ANALYSIS, AND STAMEM OF MAJOR CONCLUSIONS Data used in this pl an was obtained from several. major sources. These sources are as follows: 1. Previous Studies 2. -Field Studies 3. Standard References suchas U. S. Census, N. C. Statistical Abstract, etc. 4. A questionnaire S. Ward meetings 6. Civil groups An analysis of this data was conducted by the Washington City staff and presented to the PI anning Board for consideration. Additional analysis was performed by the Department of Natural and Economic Resources. The analysis results were used as a basis for citizen dialogue at public meetings, ward meetings, and civil group meetings. After identifying.these major land use issues and problems, alternatives and different courses of action to meet Washington's needs were explored. Again, with citizen input, the following long-range goals were formulated: GROWTH To promote orderly growth in the Washington Planning Area. ENVIRONMENTAL To discourage development of land which-is unsuitable for urban uses. HOUSING To provid'e an environment in which residents may have the opportunity to secure-adequate and safe housing. 153 RECREATION AND PARKS To provide a variety of recreational opportunities for all groups. PUBLIC SAFETY To provide the most effective and efficient means of public safety. STREETS AND TRANSPORTATION To provide a highly functional internal street system. LOCAL GOVERNMENT RESPONSIVENESS To maintain effective communication between the citizens and elected city officials. Identification of'problems and issues constituted the first phase of Washington's CAMA Land Use Planning Process. With phase one complete the actual writing of the plan began. To this extent, analysis findings were compared with. local knowledge and with Planning theory, principles, and practices. The following major conclusions are the results of this process. POPULATION Washington's population dropped rapidly from 1960 to 1970, and has continued to do so. However, by the year 1985 it should have increased from itoday's 8,860 to 9,947. After 1985 the city is expected to experience a population increase from 9,947 to 12,300 by the year 2020. Washingtonians would like for their city to grow. However, this growth must be orderly and must take into consideration the city Is ability to (1) provide adequate municipal services and (2) the area's ability to provide employment opportunities. (See Tables 2 and 16). ECON94Y Manufacturing, wholesale and retail trade accounted for Washington's major economic activity. As of 1969, Washingtonians earned an average income of $2,168 annually. 154 .The area's economic outlook is encouraging. Several phosphate operations are expected to expand in the county. However, since these plans are not final, the exact impact upon Washington economy cannot be made. Continued economic and industrial development is needed to meet future employment needs.. HOUSING In 1974 a housing survey was conducted by the city. A total of 2,722 houses were surveyed. Housing conditions were as follows: (a) 55 percent standard, (b) 42 percent substandard and (c) 3 percent dilapidated. The worst housing conditions are found in the western section of the city. This section is mostly populated with Black residents. Today Washington has an average household population of 3.26. As popula- tion estimates are realized, overcrowding will increase. It is essential that implementation of the existing housing plan continue. Added housing stock and other housing improvement will remain high among Washington's priorities. FUTURE LAND NEEDS The Washington Planning Area has approximately 16,471 acres of land and 1,245 acres of water area. The majority of land within the city is developed while most of the one-milearea remains vacant and in agricultural uses. Undeveloped land located south of the Pamlico and Tar River is low lying and not suitable for development. Nevertheless, Washington's future land needs can adequately be provided in the town's one-mile area and in urbanizing "annexation" areas. C04UNITY FACILITIES The future development and demand.for community facilities is important to any municipality due to the capital expenditures necessary to provide such services. 155 SEWER The Department of Public Works is currently havinga 201 Study done which will provide a detailed analysis of the sewer system and project'its needs over a 20-year period. The present system has a design capacity of 2.2 million gallons per day and is operating at an average 75% capacity. The recommenda- tions of the 201 Study will be the basis of Washington's future expansion of its sewer system. These recommendations will take into account projected population increases for the next 20 years and how best to.meet the needs of Washington and the surrounding area. WATER The City of Washington is in the process of completing a now well and water treatment plant. A new elevated tank capable of storing 500,000 gallons has recently been completed. The well will have a capacity of about SOO,gpm and the treatment plant will have the same capacity. With the addition of the well and treatment'plant the city will be able to process 360,000 additional gallons per day, bringing the total capacity to approximately 2.6 million gallons Der day. STORM DRAINAGE The City of Washington lies in a very flat area and has few natural drainage outlets, making the problems of providing adequate storm drainage extremely difficult and very expensive. Jack's Creek, which drains approx- imately 75% of the town, will need more equipment than it presently has to handle the run-off of future developed areas. There will be a need to install additional pumps with apprioximately SO% more capability on the dike at Jack's Creek. The area between Brown Street and the pumps should be dredged ,to allow for more retention room. Washington's present wastewater collection 156 and treatmQnt system does not provide adequate service. A "Section 201" study scheduled for completion later this year will address the most easible methods of wastewater treatment. FUTURE LAND USE The Beaufort County Land Use Plan recognizes the Washington Planning Area as being the center of existing and future urban growth in the county. This relationship is depicted,in the Washington Land Classification System. The Coastal Resources Commission adopted a. simplified land classification system for the coas tal area. This system consists of five classes: a. Developed - Lands where existing population density is moderate to high and where there are a variety of land uses which have the necessary public services. b. Transition Lands where local government plans to accommodate moderate to high density development during the following ten year period and where nec- essary public services will be provided to accommodate that growth. Community - Lands where low density development is grouped in existing settlements or will.occur in such settlements during the following ten year period and which will not require extensive public services nor or in the future. d. Rural - Lands whose highest use is for agriculture, forestry, mining, water supply, etc. based on their natural resources potential. Also, lands for future needs not currently recognized. e. Conservation - Fragile, hazard and'other lands necessary to provide for the the public health, safety or welfare. Map 9 shows the location and distribution of the Washington Land Classification System. 157 Developed The Beaufort County'Land Use Plan shows the area within the' corporate limits of Washi ngton as developed and'transitional. In the Washington Land Use Plan the area is shown as developed and transition., Transition Transitional.lands are shown in eastern, southern and western portions of the planning area. These areas are a vital part of Washington. They will receive a full range of urban services and will likely be annexed and become legally a part of Washington. These Transitional lands should be identified in the 201 Facilities Study as growth areas.. Secondary, transitional lands are shown in the southern portion of the Planning Area. These areas will not receive municipal water and sewer. RURAL The northern portion of the Washington Planning-Area is shown as Rural. Similarly, in the county plan these lands are classified as rural. CONSERVATION The southern portion of the Planning Area is shown as conservation. This classification includes the Pamlico waters and the surrounding flood lands which are ill-suited to urban development. POTENTIAL ARE-AS OF ENVIROMENTAL CONCERN The major goal of the Coastal Area Management Act is to create a balance between growth and environmental protection. The Washington Planning Area contains a number of fragile areas that would be destroyed or seriously altered ,in nature if unplanned, uncontrolled development should occur. 158 WATERSHED The Tranter's Creek watershed provides the City with its source of raw water supplies. Washington has both a primary and an auxiliary raw water intake located on Tranter's Creek. Tranter's Creek is the primary stream in the.watershed and is fed by Turkey Swamp, Beargrass Swamp, P@inelog Branch, Meadow Branch, Great Branch, Briery Swamp, Flaw Branch, lJorsepen Swamp, Poley Branch, Pea Branch, Pocosin Branch, Aggie Run, Old Ford Swamp, Singleton Swamp, Latham Creek, Gun Swamp, Snoad Branch, Maple Branch, Mitchell Branch, and Cherry Run. Most of the watershed lies beyond the city's Planning Area. With the help of the County, the City must safeguard its water supply by preventing high density residential growth and septic tank use in these areas. ESTUARINE WATERS The part of the Pamlico River north of the Railroad bridge that flows within Washington's mile and a half planning jurisdic tion is considered an estuary. These estuary waters can be protected by controlling development along the Public Trust Waters of the Pamlico.. COMPLEX NATURAL AREAS The Coastal Resources Commission may determine that there are complex natural areas within the Washington Planning Area. Complex natural areas are defined as lands that support native plant and animal communities and provide habitat conditions or characteristics that have remained essentially unchanged by human activity. Washington's extraterritorial jurisdiction south of and .adjacent to the river may possibly meet the requirements of complex natural area. If so, this area should remain essentially in the same state it is today. PUBLIC TRUST WATERS As applicable to the planning area these waters are the Pamlico and Tar Rivers and their tributaries. These waters are also shown as public trust navigable waters in the county plan. APPLICATION OF DATA TO PLAN'S FOPI@ULATION Once data was assembled and analyzed, then compared with local area knowledge, the formulation of this plan began. The Planning Board utilized the.d ata by using it as a catalyst to discuss issues and problems. The results of this planning process is this document. ESTUARINE AND RIVER ERODIBLE AREAS "Estuarine and river erodible areas are considered to be that area extending from the mean water level or the mean high water level along the estuary, sounds and rivers of the 20-county area a distance of 75 feet landward." As applicable to the planning area these waters are the Pamlico and Tar Rivers and their tributaries. In research conducted by the Institute for Coastal and Marine Resources at East Carolina University it was found that "estuarine and river erodible areas" within the Washington Planning Area have not undergone significant erosion during the past 25 years because much of the area has been stabilized by bulkheading. It was felt that the main thrust of shoreline erosion is found further downstream. 1.60 CITY-COUNTY RELATIONSHIP PART IX 161 RELATIONSHIP DEFINED The Washington and Beaufort County Plan relationship can be defined as "a coordinated effort through effective land use planning to provide a balanced growth that offers the best affordable working and living environment for all Beaufort residents." This -relationship has been part of a continuous process which has taken two forms: (1) complementing goals and objectives and(2) a com- patible County-City Land Classification System. Both County and City Plans address similar interest and citizen concerns. The following are specific examples of County and City goals and objectives relationship. COUNTY GOAL: To ensure that reational development such as travel trailer camps, second home developments, etc. will occur in a manner that will protect the natural amenities that attracted such development. CITY GOAL: To discourage development of land which is unsuitable for Urban Uses. COUNTY GOAL: To guide growth in Beaufort County so that it occurs in a slow, orderly manner. CITY GOAL: To promote, orderly growth in the Washington Ptanning Area. COUNTY OBJECTIVE: To zone growth "hot spot" such as around Washington to ensure that future growth occurs in an orderly manner. CITY OBJECTIVE:, To seek a detailed soils map for the City of Washington and Beaufort County to provide information on soils limitations on development. COUNTY GOAL: To protect the quality and natural setting of the county's waterways. CITY OBJECTIVE: To annex areas that are adjacent to the river and that tack sewerage to ensure that septic tank infiltration does not downgrade the quality of the Pamlico River. COUNTY GOAL: To ensure that recreational development such as travel trailer camps, second home developments, etc. will occur in a manner that will protect the natural amenities that attracted such devetopment. 162 CITY OBJECTIVES: To coordinate City-County recreational activities to eliminate needless duplication of personnel, facilities, and programs. These are only a few examples of Washington and Beaufort County Plan relationship in terns of complementing goals and objectives. For more specifics, the reader is asked to consult the goals and objectives sections of individual plans. In addition, examination of both Land Classification Maps and text will graphically and verbally depict compatibility and relationship of the plans land classifica- system.- 163 APPENDIX 164-a STREAM CIASSIFICATION SYSTEM *Name of Stream: Pamlico ,Class: C Sw A. Class SC Waters 1) Best usage of waters: Fishing and any other usage except bathing or shellfishing for market purposes. 2) Conditions related to best usage: The waters will be suitable for fishing and fish propagation. Also suitable for other uses requiring waters of lower quality. Quality standards applicable to class SC,waters. a. Floating solids; settleable solids, sludge deposits: only such amounts attributable to sewage, industrial, wastes, or other wastes, as will not, after reasonable opportunity for dilution and mixture of same with the receiving waters, make the waters unsafe or unsuit- able for fish, shellfish, and wildlifeP or impair the waters for any other best usage established for this class, b. pff: Shall be normal for the waters in the area, which generally shall range between 6.0 and 8.5, except that swamp waters may have a minimum of 4.3. c. Dissolved oxygen: Not less than 5,0 mg/l, except that swamp waters may have a minimum of 4.0 mg/l. d. Toxic wastes; oils; deleterious substances; colored or other wastes; Only such amounts, whether alone or in combination with other substances or was 'tes as will not render the waters injurious to fish and shellfish, adversely affect the palatability of same or impair the waters for any other best usage.established for this class. e, Organisms of coliform group: Fecal coliforms not to exceed a log mean of 1,000/100ml (MPN or MF count) based upon at least five consecutive samples examined during any 30-day period; nor exceed 2,00 ,0/100ml in more than 20% of the samples examined during such period. (Not applicable during or immediately following periods of rainfall.) f. Temperature: Shall no@ be increased above the natural water tempera- ture by more than 1.5 F. during the months of June, July, and August no6 more than 4.ooF., during other months, and in no case to exceed 90 F., due to the discharge of heated liquids. Name of Stream: Tar Class: C 165-a B. Class C Waters 1) Best usage of waters: Fishing, boating, wading, and any other usage except for bathing or as a source of water supply for drinking, culinary or food-processing purposes. 2) Conditions related to best usage: The waters will be suitable for fish and wildlife propagation. Also suitable for boating, wading, and other uses requiring waters of lower quality. 3) Quality standards applicable to class C waters. a. Floating solids; settleable solids; sludge deposits: Only such amoinits attributable to sewage, industrial wastes.or other wastes as will not, after reasonable opportunity for dilution and mixture of same with the receiving waters, make the waters unsafe or un- suitable for fish and wildlife, or impair the waters for any other best usage established.for this class. b. pH: Shall be normal for the waters in the area, which generally shall range between 6.0 and 8.5, except that swamp waters may have a low of 4.3 c. Dissolved oxygen: Not less than 6.0 mg/l for natural trout waters; 5.0 mg/l for put-and-take trout waters; not less than a daily average of S.0 mg/I with a minimum.of not less than 4.0 mg/l for fton-trout waters, except that swamp waters may have lower values if caused by natural conditions. d. Toxic wastes; oils; deleterious substances; colored or other wastes; Only such amounts, whether alone or in combination with other substances or wastes as will not render the waters injurious to fish and wildlife or adversely affect the palatabl lity of same, or impair the waters for any other best usage established for this class. e. Organisms of coliform group: Fecal coliforms not to exceed a log, mean of 1,000/100 ml (MPN or MF count) based upon at least five consecutive samples examined during any 30-day period; nor exceed 2,000/100 ml in more than 20% of the samples examined during such period. (Not applicable during or immediately following periods of rainfall.) 0 f. Temperature:.Not to exceed S F. above the natural water temperature, and in no cass to exceed 840F. for mountain and upper piedmont waters and 90 F. for lower piedmont and coastal plain waters. The temperature of natural trout waters shall not be significantly increased0due to the discharge of heated liquids and shall not exceed 68 F.; however, the tempe6ature of put-and-take trout waters may be in8reased by as much as 3 F. but the maximum may not exceed 70 F. 166-a BIBLIOGRAPHY BIBLIOGRAPHY 46rick, Frank B. and T. Stuart Critcher Wildlife and Land Use Planning with Particular Reference to Coastal Count7le-s, N. C. Wildlife Resources Commission, Raleigh, N. C. M-S. Beaufort Soil and Water,Conservation District. An Appraisal of Potentials: Outdoor Dev6lopffient,.Beaufort County, N. C. Beaufort Soil and Water Conservation Districit-,--Ifa-s-F-ington, N. C. 1972. Board of Water and Air Resources. Rules, Regulations, Classification and Water Quality.Standards Applicable to the Surtace Waters of North Carolina, Raleigh, Department of Natural and Economic Resources, 1972. Bureau of Employment Security Research. N. C. Labor Force Estimates, Employment Security Commission of N.--C-.,--Ra1-e1gh, N, C. 197S. Coastal Resources Commission, Handbook on Public Participation-in the Develop- ment of Land Use Plans in T-e-Coastal Areas of North Carolina, Department oE Natural and Economic Resources, Raleigh, 1975, Coastal Resources Commission, "State Guidelines for Local Planning in the Coastal Area under the Coastal Area Management Act," Raleigh, N.C. 1975. unty Population Trends North Carolina 1790-1960, Carolina Population Center, NIPO P .U'.N.C. and Statistical Services Center, N. C. Department of Administration, Raleigh, N. C. 1969, Dawson, Amos. "Report on Land and Water Resource Use Problems Related to the Carrying Capacity of the Coastal Area of North Carolina@." Coastal Resources Commission, Raleigh, 1976. Employment Security Commission. North Carolina Commuting Pattern, 1960-1970, Employment Security Commission of Raleigh,'N. C. 1974. Endangered Species Committee, Department of Natural & Economic Resources. Preliminary-List of Endangered Plant and Animal Species in North Carolina, Resources Management Section, Raleigh, June, 1973. Fish, Frederic F., A Catalog of the Inland Fishing Waters of North Carolina, Raleigh, N. C .Wildlife Resources CommisHon, 1969. Freeman, W. F. Region Q: Water Resource Management (High Point, North Carolina: Freeman Associates, 1975). Goodman, W. I. and Fruend, E. C., eds. Principles and Practices of Urban o Planning,(Washington, D. C.: International City Managers' Associat n, 1968). N. C. Agricultural Extension Service and North Carolina Department of Natural and Economic Resources, Coastal Area Management: A New Look on the Horizon, Misc. Ext., Publication No. 131 ( aleilgh: North Carolina Agricultural Extension, 1974), .N. C. Coastal Resources Commission. State Guidelines for Local Planning in the .Coastal Area Under the Coastal Area -Management Act of 1974, (G.S. 113A-107 e, 1975). N. C. Department of Transportation. Seven Year Highway Plan, N. C. Department of Transportation, Raleigh, N.C., 1975, N. C. Soil and Water Conservation and Needs Committee. North Carolina Conserva- tion Needs Inventory. N. C.-United Stated Department of Agriculture, S Conservation Service, Raleigh, N.C., December, 1971. N. C. Department of Administration. North Carolina State Goverment Statistica I Abstract, Second Edition, Raleigh, 1973. N.C. Department of Administration. Profile of North Carolina Counties, Raleigh N. C., March 1975, N. C. Land Policy Council. A Land Policy for North Carolina, Raleigh, 1976. N. C. Department of Natural & Economic Resources. Rules, Regulations, Classifica- tions, and Water Quality Standards Applicable to the Surface Waters of N.C, Division of Environmental Management, Raleigh,, 1976. 'SN. C. Department of Natural & Economic Resources. Wash ington Park and Recreation Study, Raleigh, N, C., 1967, Rodman, W. C. Comprehensive Water and Sewer Study: Beaufort County, N.C. W. C. Rodman--Land Surveying and Civil Enginee'ring, Washington, N.C. 1971. Sharpe, Bill. A New Geography of.North Carolina, Vol. IV, (Raleigh, N.C.: Sharpe Publishing Company, Inc., 1965). U, S. Department of Agriculture, Soil Conservation Service, Descriptions of Soil Associations, Beaufort CountX (U.S. Government Printing Office, 1971). U. S. Department of Commerce, Bureau of the Census. 1970 Census of Population (PC(1)C35NC) General Social and Economic Characteristics, United States Goverment Printing Office, Washington, D.C. 1972. U. S, Department of Commerce, Bureau ofthe Census, 1970 Census of Po2ulation General Population Characteristics. (PC(1)BBSNC), United States Government Printing Office, Washington, D-.C., 1972. U. S.Water Resources Council. OBERS, Projections, Series E, Bureau of the Census, Washington, D. C., 1972. VEPCO. City of Washington and Beaufort County, North Carolina: An Economic 0 Study, Virginia Electric and P-ower Company of Williamston, N.C., 1964. Wilkinson', Richard P. and R. Paul Darst. Critical Areas of North Carolina, N.C. Department of Administration, Raleigh, N.C.,1972. Oilson, Kenneth A. North Carolina Wetlands Their Distribution and Management, Raleigh, N.C. Wildlife Resources Commission, 1962. Woodhouse, W. W., E.D. Seneca and S. W. Broome.' @Iarsh Building with Dredge Spoils in North Carolina. Coastal Engineeriiig-Research Center, et. al-. Raleigh, 1970. DATE DUE I I - - - I - I GAYLORDINO. 2333 PRINTED IN U S A I-- -- -- E ,ll ll lll@ 3 6668 14108 6738