[From the U.S. Government Printing Office, www.gpo.gov]
INTERIM REPORT on PERMISSIBLE LAND AND WATER USES in the MISSISSIPPI COASTAL ZONE DRAFT HD 211 .M7 158 1977 no.3 SSIPPI MARINE MARINE RESOURCES COUNCIL COASTAL ZONE INFORMATION CENTER M M RC CZM Report 003 INTERIM REPORT on PERMISSIBLE LAND AND WATER USES in the MISSISSIPPI COASTAL ZONE D R A F T Prepared by Mississippi Marine Resources Council April 1977 MMRC CZM Report 003 US Department Of Commerce NOAA Coastal Services Center Library 2234 South Hobson Avenue Charleston, SC 29405-2413 The preparation of this document was partially financed through a federal grant frem the U. S. Department of Commerce, National Oceanic and Atmospheric Administration, as authorized by Section 305 of the Coastal Zone Management Act of 1972, as amended. ABSTRACT The requirements of the Coastal Zone Management Act of 1972 specify, in part, that the State must develop an inventory of natural and man-made coastal resources, must establish a method for analysis of the various land and water uses and their impacts on the coastal waters, and must determine those uses which are subject to the program. The Mississippi Marine Resources Council is developing a Mississippi Coastal Program under the provisions of the CZM Act and, as a part of this development process, has developed the required inventory, has es tablished the required methodology, and has determined those land and water uses which are to be subject to the program. This work, like every phase of the development process, is subject to revision. Although the boundary of the State's coastal zone has not as yet been delineated, the Council has concentrated its planning efforts first within the six southernmost counties of the state (Hancock, Harrison, Jackson, Pearl River, Stone and George), and more recently within the three coastal counties (Hancock, Harrison and Jackson). The Council has prepared this interim report in draft form in order to assist the local, state and federal agencies and others who may be af fected by the program. A revision of the material contained in this report will be included as a part of the draft Mississippi Coastal Program. The draft program will be subject to formal public hearings, action by the State Legislature and the Governor, and approval by the Department of Commerce before it can be implemented. EXECUTIVE SUMMARY Four of the seven elements which go into development of a Coastal Zone Management program relate to: (1) the boundary of the coastal zone, (2) specific areas within that boundary, (3) the manner in which these areas and,their resources can be utilized, and (4) the method by which this utilization is regulated. There are numerous other aspects of a CZM program which will be embodied in the draft Mississippi Coastal Program, including a vast number of specific details, policies and regulations, but these are the basic parts of a working program. The third of these four basic elements, the manner in which the coastal zone's resources may be used, directly addresses the primary objective of the CZM Act. It also is liable to result in the most controversy. This report provides an extensive inventory of both natural and man-made resources of the coastal zone, including the historical and geological background of the area. The inventory goes into details of population, industrial and recreational facilities, transportation and other developments in Hancock, Harrison and Jackson counties. The various land and water uses of these resources which can have direct and significant impact on the coastal waters, and thus are subject to the management program, are then defined and listed. Matrixes are included in.the.appendix listing these uses and evaluating them as to their sign ificance, impact and the various support services and uses they would require. An extensive methodology is then described for de.termi.ning those land and water resource uses which are to be classified as permissibl e and subject to the program. iv This methodology is to be applied to individual uses on a case-by-case basis for analysis. This methodology is shown in flow chart form in the appendix. All of the material contained in this report is preliminary in nature and is published on an interim basis. It is being distributed to concerned individuals and agencies for comment prior to revision and inclusion as a part of the draft Mississippi Coastal Program. This program will be considered during formal public hearings prior to submission to the Legislature and Governor, and to the Department of Commerce, Office of Coastal Zone Management, for approval. v ACKNOWLEDGEMENTS The Mississippi Marine Resources Council acknowledges the cooperation and assistance of Southern Mississippi Planning and Development District for technical and graphic assistance in the preparation of this report. Acknowledgement is also extended to Gulf Regional Planning Commission for major portions of the Inventory of Natural and Man-made Coastal Resources. Acknowledgement is also-extended to Gulf Coast Research Laboratory for historical and geological sketches obtained from the Cooperative Gulf of Mexico Estuarine Inventory and Study--Mississippi. vi TABLE OF CONTENTS PAGE PART I INTRODUCTION 1 PART II INVENTORY OF NATURAL AND MAN-MADE COASTAL RESOURCES 4 Requirements of the CZM Act 5 Purpose 6 Historical Sketches 7 Geological Sketches 10 Population and Land Use i4 Significant Man-Made Coastal Resources, 28 Significant Natural Coastal Resources 40 PART III PERMISSIBLE LAND. AND WATER USES 55 Requirements of the CZM Act 56 Purpose 57 Land and Water Uses 58 Permissible Uses 73 Methodology for Determining Resource Uses to be Permitted and Managed 77 vii LIST OF TABLES TABLE PAGE 1 POPULATION GROWTH PATTERNS 15 2 MUNICIPAL POPULATION 16 3 COUNTYWIDE POPULATION ESTIMATES 17 4 EXISTING LAND USE SUMMARIES 20 5 HARRISON COUNTY RESIDENTIAL-COMMERCIAL ANALYSIS 24 6 NAVIGATION CHANNELS IN THE MISSISSI-PPI SOUND 33 7 REGIONAL INDUSTRIAL SITES 47 8 INDUSTRIAL PARK SUMMARY 50 9 REGIONAL PARKS AND RECREATION AREAS 51 10 PERMISSIBLE LAND USES 74 11 PERMISSIBLE WATER USES 76 LIST OF FIGURES FIGURE PAGE I MISSISSIPPI SOUND BASE, CHANNEL AND HARBOR IMPROVEMENTS 32 2 LAND USE EVALUATION MATRIX Appendix 3 WATER USE EVALUATION MATRIX Appendix 4 ANAL YSIS FRAMEWORK Appendix viii THE FOLLOWING GUIDE RELATES THE OCZM REQUIREMENTS FOR PROGRAM APPROVAL (SECTION 306) TO MISSISSIPPI'S COASTAL ZONE MANAGEMENT REQUIREMENTS 15 CFR 923, SECTION PART PAGE .12 PERMISSIBLE LAND AND WATER USES II ix DEFINITIONS Coastal Waters those waters adj acent to the shorelines, including but not limited to - sounds, bays,.bayous, and estuaries. Coastal Wetlands as defined by the Mi ssissippi Coastal Wetlands Protection Law, "means all publicly owned lands subject to the ebb and flow of the tide; which are below the watermark of ordinary high tide; all publicly owned accretions above the water- mark of ordina ry high tide. The term 'coastal wetlands' shall be interpreted to include the .flora and fauna on the wetlands and in the wetlands." Coastal Zone all those lands within the three Mississippi coastal counties of Hancock, Harrison and Jackson Counties including the Primary, Secondary and Tertiary Coastal Areas. Direct and Significant any Iacti vity initiated by man causing a Impact discernible and/or predictable modification of the coastal wetlands. [ All reasonable and appropri ate uses having a direct and significant impact will be permitted if action is taken to protect against adverse effects to the economy, public health, the land and its vegetations and wildlife, and the waters within the coastal zone and their aquatic life.] x DEFINITIONS (CONTINUED) Land Use activities conducted on coastal lands above the watermark of ordinary high tide and abutting the state wetlands and includes activities which utilize and/or influence nearshore submerged lands of the coastal wetlands. Permissible land and those uses that, by their very nature, are water uses dependent to a coastal location adjacent to or on the state wetlands and have a direct and significant impact on coastal waters. [Such uses cause change in: Shoreline configurations, flow of littoral currents, bottom characteristics and other effects which influence, displace or result in loss of marine biota and/or with associated impact(s).] Person any natural person, partnership, joint stock company, corporate entity, unincorporated association or society, or the state and any agency thereof, or any county, municipality, or political subdivision, or any other corporation ,of any character whatsoever. xi DEFINITIONS (CONTINUED) Primary Coastal Area -.all publicly owned lands.subj ect to the ebb and flow of the tide which are below the water- mark of ordinary high tide; all publicly owned accreations above the watermark of ordinary high tide; a,ll publicly owned submerged water bottoms below the watermark of ordinary high tide and those areas between the natural banks of tidal influenced riverine systems. Private - the facility or activity is not available to the public. Public - any facility, activity or service that is available to all people on a "first come first serve" basis. Ownership may rest with a city, county, the state, an individual, or a corporation. when applied to transportation uses, is considered in the alternate sense of the term, that of being in general service to the community, region and nation. Secondary Coastal Area all upland areas, not owned or controlled by entities of the U.S. Government, which are between the watermark of ordinary high tide and the elevation of thirteen and one-tenth feet (13.5') above mean sea level, or those upland areas from the natural xii DEFINITIONS (CONTINUED) Secondary Coastal Area (cont.) banks of tidal influenced riverine systems up to the highest level of flooding that, on an average, is likely to occur once every one hundred (100) years or that has a one (1.0) percent chance of occurring each year. Semi-Public there ar e certain prerequisites that must be satisfied prior to use of a facility, such as ownership of a lot within a subdivision before a boat slip can be rented at the particular development's marina. However, the facility is available to all people who own land in the subdivision development. Tertiary Coastal Area - all those lands within the coastal counties of Hancock, Harrison and Jac kson. Water Use - activities which are conducted on and/or in the coastal waters, and offshore facilities resting' on, supported by or utilizing wetlands. xiii PART I INTRODUCTION INTRODUCTION One of the national policies spelled out in the Coastal Zone Management Act is to assist the states in considering the ecological, cultural, historic and esthetic values of the coastal zone in addition to the needs for economic development. All of the other elements of the Mississippi Coastal Program are simply a means of leading into direct consideration of these values and needs, the objective directly addressed in this interim report. It is through the Mississippi Coastal Program that this state seeks to enable an orderly development of the rapidly growing coastal zone for the maximum benefit of this and future generations while insuring the future maintenance and utilization of the area's resources. The Mississippi Marine Resources Council, through a series of contracts with other agencies and investigators in the past several years, has sought to identify those natural and man-made coastal resources in order to establish a framework for the coastal program. Several tests were applied to the various resource uses to determine what activities have a direct and significant impact on the coastal waters. Once these uses were determined and were analyzed by use of the methodology , those uses that met its test were determined to be subject to the program. Other aspects of this task involved defining "direct and signi- ficant" impacts and a methodology for determining which uses have such an impact and, thus, are subject to the program. 2 The results of these efforts have be en compiled by the Council and its staff into the element of the Mississippi Coastal Program known as Permissible Land and Water Uses. 3 PART II INVENTORY OF NATURAL AND MAN-MADE COASTAL RESOURCES 4 REQUREMENTS OF THE CZM ACT. Section 923.12 (Title 15 CFR) requires that the management program shall include an inventory of natural and man-made coastal resources." 5 PURPOSE The first task in determining those uses which have a direct and significant impact on the coastal waters was to obtain information base concerning land use and population. This base included existing and projected trends in industry, commerce, recreation and transportation. These findings are presented in this part, along with supplementary information concerning late history of the coast, the geology and geography of the coastal area. 6 HISTORICAL SKETCHES SIXTEENTH AND SEVENTEENTH CENTURY Maps of this period offer the best means of following the progress of early discoveries in the Gulf of Mexico. A review of these early events is adequate from a Gulf-wide point of view. Mississippi Sound was apparently first mapped as the "Mar Pequena" of the 1519 expedition of Don Alonzo Alvarez de Pineda. Although some details including abundant oyster banks were noted, there remains some question as to whether Pineda actually reached what is now the Mississippi River and named it the "Rio del Espiritu Santu". In 1528 the ill-fated expedition of P;nfilo de Narv;rez ended in the vicinity of Mississippi Sound. Cabeza de Vaca survived this expedition to make further explorations to the west. Although various explorers of several countries continued to add something to knowledge of the Mississippi Gulf Coast, permanent colonization did not begin until 1699. SETTLEMENT TO STATEHOOD Pierre le Moyne d'Iberville anchored his vessels at Ship Island on February 10, 1699. After explorations up the Mississippi and, by a part of this expedition, Lake Pontchartrain and Lake Maurepas, he placed a colony at "Vieux Biloxi". Although there is still some argument about the exact original location of Fort Maurepas, the first settlement, there now seems to be little question that it was first built in the Biloxi Bay area. The area fel-I unde r the rule of France, England and Spain as they jockeyed for position in the New World. Final disposition occurred in 1810 when the United States by a show of force at Baton Rouge took over the West Florida area. Seven years later representatives of coastal counties participated in the writing of the first Constitution of the State of Mississippi and admission to the Union was granted on December 10, 1817. In 1818 the legislature authoriz,ed a lottery to raise additional money for the improvement of navigation channels in the Leaf, Chickasawhay and Pascagoula Rivers. These streams were major factors in the state's transportation. A 1966 condition report on Pascagoula River channel improvement, first authorized by Congress in 1899, shows the junction of the rivers at mile 81. Controlli.ng depth to Dead Lake at mile 32 was 12 feet, with 3 feet to head of project. The Chickasawhay and Leaf, according to historical reports were navigable "almost any season of the year by vessels drawing not more than 5 feet" for distances of 130 and 60 miles, respectively. The Corps of Engineers in 1966 recommended abandonment of-the maintenance authorization for Leaf and Chickasawhay rivers.. THE MISSISSIPPI GULF COAST River transportation give way to the railroads about 1855. Prior to that time at least 1 million bales of cotton moved down the Pascagoula system from as far up river as Enterprise. Mississippi briefly unfurled the Bonnie Blue flag and adopted the Magnolia flag before joining the Confederacy. Jefferson Davis spent his last days at Beauvoir. 8 .Denudation of the virgin long leaf pine lands accelerated after The War Between the States. Demand for lumber grew and saw mills were established. World W ar I and the great depression that began with the stock market crash of 1929 had their effect. By the mid-1930s the last of the "inexhaustible" virgin timber was gone. Fortunately for the watersheds of the Mississippi Coast the demand for pulpwood led to reforestation. The location of pulp mills on waterways and the resultant uncontrolled effluents was not so fortunate. The ailing agrarian economy of the state was turned toward industry when Governor Hugh White initiated his "Balance Agriculture with Industry" program. Industrialization continues at a rapid pace. Tourism got an early start in Coastal Mississippi. The haunting music of the Singing River, the mineral waters at Ocean Springs, the beautiful and bountiful estuarine waterways and the open-handed hospitality of the people contributed to the development of this industry. Fishing was important to the development of the Mississippi Gulf Coast from the beginning. The fishing industry has often been overshadowed by others such as the lumber boom and shipbuilding. However, utilization of estuarine species in particular has been important and continuous. The first shrimp cannery on the Mississippi coast was built in 1878 and was noted in (188.7) the existence of "fishing establishments" on Horn Island. 9 From the founding of Biloxi in 1699, shellfish (shrimp and oysters) and fish afforded a way of life for the settlers. These marine animals not only served as a daily table staple, but were also used as barter for other essential items. Increased activity in the latter part of the nineteenth century accounted for considerable population increase from fishery workers who came and stayed. In 1901, one company alone shipped 525 carloads of shrimp and oysters. Prior to and during United States participation in World War II expanding military bases and shipbuilding activities resulted in greatly increased human population density in coastal counties. Local and regional planning commissions have laid ambitious plans for industrialization of the entire coastal area. For over two and one half centuries of occupation by "civilized" man and through undetermined thousands of years of Indian habitation, the coastal resources of Mississippi have been exploited. Remarkably, these resources have continued to renew themselves. GEOLOGICAL SKETCHES GENERAL DESCRIPTION The Mississippi coast is classified as an "alluvial coast: terraced deltaic plain". The slope of the coastal plain is fairly steep, reaching eight feet per mile in some areas nearthe coast. The Pascagoula and Pearl Rivers flow through Pleistocene and Recent deltas. St. Louis Bay and Biloxi Bay are minor.embayments of drowned stream valleys. A series of low, parallel, elevated shoreline scarps is evident. Relatively small drainage areas and the steep alluvial coast result in marsh areas that are in relation to the Louisiana coast, comparatively narrow. 10 Mississippi Sound is bounded offshore by a series of barrier islands.with wide, shallow passes. Deepe r water is found near the west end of the islands. Ship channels are maintained off the west end of Petit Bois and Ship Islands. The Pascagoula and Pearl Rivers, with drainage areas of 9,400 and 8,700 square miles respectively have an average discharge into Mississippi Sound of 15,200 and 12,800icfs (cubic feet per second) respectively. Biloxi River, Wolf River Jourdan River, Bayou Bernard and numerous smaller streams contribute to a total estimate of 19,660 sq. mi. of drainage area and an avera ge discharge of 31,220 cfs. Additional fresh water enters the Sound from the Pontchartrain-Lake Borgne drainage and Mobile Bay. The climate in the area is humid, warm-temperate to sub-tropical. Some freeZing weather always occurs during the winter and occasional winters include periods of low temperature which result in surface ice on inland bays and bayous. Rain- fall ranges from-34.5 to 90 inches per year, averaging 58.9. In the Sound and adjacent waters many environmental factors vary areally and temporally. Annual variation as well as seasonal have been observed. Along the barrier islands, intertidal areas, are almost entirely in sand. Fairly steep berms, bare of vegetation along the foreshore, characterize most of the beaches. On the mainland and inshore islands intertidal areas are more varied. Over one-third of the Mississippi Coast line has been "improved". Wide sand beaches have been built in front of seawalls by pumping material in from shallow waters offshore. Clays and silts soon leach out, leaving a clean sand surface. Constant maintenance prevents tne growth of plants which, initially at least, start to cover recently filled areas. The nearshore bottom along these beaches varies from sand to sandy mud. The oemaining natural beach at Belle Fontaine is several miles long and the. bottom aloig this beach is usually softer. Around the bays, distributaries and bayous there is usually a marsh border of variable width. Along the coast these marshes are made up of a typical Spartina Juncus succession. Inland the species composition of the marsh flora changes with reduced salinity regimes. Submerged vegetation along the coast is dominated by widgeon grass (Ruppia maritima). Species with lower salinity tolerances appear upstream. Around the barrier isilands large beds are in evidence during the summer. In shallow water they die out during the winter. Beginning in shallow intertidal water and moving offshore the dominant species are shoal grass (Diplanthera wrightii), manatee grass (Cymodocea manatorum) and turtle grass (Thalassia testudinum). The diurnal tides of Mississippi Sound have a predicted range of a little over 1.5 feet and aiImean tide level of .8-.9 feet. However, the cyclic predictions are subject to drastic modifications by winds which are predominantly northerly and northeasterly during the winter months and southerly and southeasterly during the summer. Large areas of shallow flats are sometimes uncovered when winds are from the north. Prolonged periods of south and southeast winds sometimes keep the marshes flooded for long periods. These periods vary from year to year. Soft mud sediments are found over most of the sub-tidal bottoms, except near the barrier islands. Solid substrate is ge nerally limited to oyster reefs, scattered shell, other organic detritus and material introduced by man. SHORELINE It is approximately 70 statute miles along the Mississippi coast between east and west State lines. The tidal shoreline included in this distance is 369 statute miles. This distance comprises the shoreline of the barrier islands, the mainland 12 coast, and bays, rivers and creeks to the head of tidewater- or to a point where tidal waters narrow to a width of 100 feet. Many additional miles of waterfront property lie along tidal streams and dredged c6nnels above the point where they narrow to a width of 100 feet. During the past several thousand years the shoreline of Mississippi has altered many timesp Sea level has changed eustatically from about +20 feet to -350 feet in response to continental glaciation and melt. During the time of greatest glaciation sea level was perhaps 300- 450 feet lower than the present, at which time existing streams entrenched themselves in deep, narrow valleys. Since then, sea level has risen erratically to its present level of still-stand, filling the valleys and inundating the lowlands. The Pascagoula River now represents a drowned ri er valley that is filling from its own load of sediments; Biloxi Bay Y is a drowned channel that has not yet filled. The lowlands were covered by a body of water, which, when modified by formation of barrier islands, became known as Mississippi Sound. Eustatic changes have not been apparent in the past 4000-5000 years, though.the coastline has been modified by influx and deposition of sediments. The presence of the Mississippi River delta affects the coastline of the western part of the state. The weight of sediments in the delta is causing a structural subsidenlof the earth's crust between Texas and Alabama. In Mississippi there is a terrace level at +20 feet in Jackson County; in western Hancock County this terrace has disappeared beneath a sedimentary cover less than 10 feet in depth. Tectonic changes in local sea level are apparent in this feature as well as in the sinking of the western tip of Cat Island. In summary, the coastline is termed as an "alluvial coast: of terraced deltaic plain" which is eKperienceing no eustatic sea level changes but is being altered by depositional and tectonic processes. 13 POPULATION AND LAND USE Population estimates and projections were made for a general overview of the conditions in three county areas. These estimates-and projections were made by the Gulf Regional Planning Commission (GRPC) under contract with the Mississippi Marine Resources Council. GRPC considered both population and housing concurrently in their projections since existing housing is one too] to estimate current population and, to the lesser extent, to forecast population. growth. In making population forecasts, housing, as well as historic data, census information, and existing and proposed land use regulations, have been utilized. EXISTANT POPULATION Population in the study area experienced considerable growth during the period 1940 to 1970. As shown in Table 1, the region experienced a growth of 163 percent over the 30 year period while the State of Mississippi experienced less than 2 perC*ent growth. The largest individual growth was seen in Jackson County where population increased by 327 percent. It is obvious from these facts that the coastal area, particularly Harrison and Jackson Counties is growing at a rapid rate. Because of this, special attention must be given the area in providing services and meeting growing socio-economic demands brought on by these increases. 14 TABLE POPULATION GROWTH PATTERNS 1940 to 1970 Population Percent chan e AREA 1940 1950 1960 1970 1940 to 1970- Hancock Co. 11,328 11,891 14,039 17,387 53 Harrison Cb. 50,799 84,073 119,489 134,582 165 Jackson Co. 20,601 31,401 55,522 87,975 327, Region 11 101,853 148,006 211,461 267,746 163 State 2,183,796 2,178,914 2,1178,141 2,216,912 2 .1 Includes Hancock, Harrison, Jackson and Pearl River Counties SOURCE: GRPC," 1973 Housi ng Program" based on Census Data for the years 1940, 1950, 1960, and 1970. PROJECTED POPULATION Population estimates at 5 year intervals (Table 2) have been computed for each municipality in the Coast counties in order to address socio-economic demands where they are most frequently found. Countywide estimates and forecasts to the year 2000 are shown on Table 15 TABLE 2 MUNICIPAL POPULATION FIVE YEAR INTERVALS 1975 through 2000 Gulf Region Municipality HANCOCK COUNTY .Bay St. Louis 6,854 7,654 8,454 9,254 10,054 10,899 Waveland 4,614 4,979 5,344 5,709 6,074 6,438 HARRISON COUNTY 3ass Christian 7,149 7,828 8,507 9,208 9,908 10,488 Long Beach 9,239 9,353 9,467 10,252 11,037 12,204 Gulfport 1/ 52,291 54,081 55,870 60',557 65,243 68,156 Biloxi 1/ 43,025 49,387 55,749 61,295 66,840 72,471 JACKSON COUNTY 13cean Springs 14,170 15,078 15,985 17,771 19,557 20,357 Moss Point 20,008 23,986 27,964 31,091 34,218 37,362 Pascagoula 33,874 36,251 38,628 42,949 47,271 51,566 V Figures for Gulfport & Biloxi do not include population residing in on-base housing at Keesler Air Force Base & the Naval Construction Battalion Center. SOURCE: Existing Population figures are based on current housing accommodations. Forecasted populations are straight line projections based on historical data. Gulf Regional Planning Commission 16 TABLE 3 COUNTYWIDE POPULATION ESTIMATES EXISTING & FORECASTED Population County 1975 2000 HANCOCK Total County 20,481 54,339 Total Unincorporated 9,013 37,002 Total Municipal 11,468 17,337 Bay St. Louis 6,854 10,899 Waveland 4,614 6,438 HARRISON Total County 163,155 242,305 Total Unincorporated 51,451 78,986 Total Municipal 111,704 163,319 Pass Christian 7,149 10,488 Long Beach 9,239 12,204 Guifport 52,291 68,156 Biloxi 43,025 72,471 JACKSON Total County 115,636 189,751 Total Unincorporated 47,584 80,466 Total Municipal 68,052 109,285 Ocean Springs 14,170 20,357 Moss Point 20,008 37,362 Pascagoula 33,874 51,566 COASTAL REGION Total Region 299,991 476,446 Total Unincorporated 108,767 186,505 Total Municipal 191,224 289,441 SOURCE - Gulf Regional Planning Commission 17 LAND USE Land use in the three county coast area are broadly grouped i.nto eight class- ifications. Each classification and sub-classification were delineated on individual township maps of the three counties. These maps are not-s-hown in this report since they go beyond the general purpose of this study. Copies of the maps may be viewed at the offices of the Mississippi Marine Resources Council. The eight land use classifications are as follows: 1. Residential contains five sub-categories; single family, mobi le home, duplex, multi-family and mobile home parks. 2. Commercial, covering all types of commercial activity including central business districts, neighborhood commercial, community and regional shopping centers and general highway commercial. 3. Industrial classifications embrace all existing industries including all forms of manufacturing, open storage of raw materials, semi-finished and finished products, salvage yards and excavation activities. 4. Public and semi-public land uses cover all governmental activities including schools, colleges, fire stations, courthouses, city halls, libraries, and tax supported institutions, churches, non-profit hospitals, community centers, public recreation, parks, stadiums, public beaches and similar uses. 5. Rights-of-way identify lands delineated for streets, roads, highways, rail- roads, and utility lines. 6. Resource production activities include all types of farming, crops, pastures, dairies, orchards, commercial forests, national forests and tidal marshes. 18 7. NASA-:Military lands include the National Space Technologies La.boratorY, Keesler Air Force Base and the Naval Construction Battalion Center (NCBC). 8. Water and Unclassified make up the remainder of land uses within this classification. These areas are usually left void of any classification and may be generally identified by lack of activity. Land use @urveys conducted by Gulf R.e gional Planning Commission in 1969 and 1972 serve as a basis for determining trends in land use activities. In the following paragraphs each county is addressed separately relative to land use changes between the year 1969 and 1972. Such comparisons may be used to analyze current activities and to plan future land uses within the study area. A summary of exist- ing land use acreage and changes is given in Table 4. Some short observations are also made as to the cause of the change in the various land uses. HANCOCK COUNTY Hancock County has two incoporated cities within its boundaries, Bay St. Louis and Waveland, both having comprehensive community plans by which growth may be guided. Between 1969 and 1974, Bay St. Louis updated its zoning re gulations while Waveland adopted a completely new zoning ordinance. Hancock County has adopted subdivision regulations. The County's economy is directly linked with tourism but the degree in linkage is uncertain. With the opening-- of Interstate 10 during 1973, the urban areas (Bay St. Louis and Waveland) were by-,passed by this major thoroughfare. The extent of 3conomic consequences is undetermined at this time; however, an I-10 Impact Study conducted by GRPC in 1973 predicted minimum long term adverse impact. 19 TABLE 4 EXISTING LAND USE SUMMARIES With Percent Changes from 1969 - 1972 Public, Resource NASA Water- and Residential Commercial Industrial Semi-Public Rights-of-Way Production Mi I ILaa Unclassified Total County Acreage-%Change Acreage-%Change Acr@_e-age%Change Acreage-%Change Acreage-%Change Acreage-%Change Acreage-%Change Acreage-%Change Acreage Hancock 3,865.9 47 231.6 18 4,442.6 1 1,480.3 95 6,835.8 4 59,018.1 50 109,820.7 0 122,165.6 -15 307,410.6 Ha rri son. 14,239. 3 18 1,434.2 13 2,389.3 15 5,366.6 0 10,193.4 3 187,449.3 3 2,802.1 0 155,467.4 - 4 379,341.6 Jackson 11,403.3 17 938.7 13 5,181.8 8 6,401.3 3 10,407.2 3 178,230.4 20 00.0 0 253.325.1 -10 465,887.8 REGION 1 34,800.3 -- 2,892.8 12,665.2 -- 15,910.2 .36,782.5 -- 677,032.1 -- 115,301.1 777,750.5 -- 1 673,134. 5 I Includes Hancock, Harrison, Jackson and Pearl River Counties. SOURCE: GRPC Regional Land Use Plan, 1973. 20 Initial data for Hancock County was collected in 1969 while data for updating purposes was accumu lated in 1972. A comparative analysis of these data revealed some interesting findings that are discussed below. Residential land use showed an over-all increase of 47% from 1969 to 1972. An increase of this magnitude could possibly have had an undesirable effect on the County as a whole, due to the overloading of existing public facilities, such as streets, sewage, water system s, policy and fire departments, schools and libraries. Fortunately, deficiencies have not been too severe, although sewage collection and water systems constituted somewhat significant problems. More recently efforts have been made to alleviate these deficiencies, the results of which are found in a new treatment plant for Waveland and experiments with.new treatment concepts in the form of water hyacinths in Bay St. Louis. At present, Hancock County is util.izing only 19% of the total residential acreage that will be needed by 2000. Commercial acreage showed an over-all gain of 18% from 1969 to 1972. The increase was necessary to adequat ely provide goods and services for the large residential influx. Industrial land use increased only slightly over the past three years; nevertheless, a great amount of progress was accomplished in this category. Considerable develop-- ment occurred at the Industrial Park and Seaway (Port Bienville) located south of Pearlington near the mouth of Pearl River. By means of this development, Hancock County, under the direction of the Port and Harbor Commission, is attempting to further @Aversify the County's economic base. Industrial development also occurred at Stennis International Airport which is located adjacent to the eastern boundary of the KTL Buffer Zone, (NASA). 21 Public and Semi-Public acreage grew enormously over the period of analysis .(1969-1972). Actual increase of this category was almost 100%. Two facilities were primarily responsible for this increase. First with the addition of Stennis International Airport which was not considered in the initial (1969) survey since the facility was not then in operation. The other major addition came with the donation of several hundred acres as a Boy Scout Camp which is placed in the Semi-Public category. The Boy Scout facility is now completed and includes a large lake providing additional recreational activities. These facilities, combined with the construction of Buccaneer State Park in Waveland, constitute three very substantial assets for Hancock County. Resource Production land use reflected an increase of 50% from 1969 to 1972. The actual increase was a result of Tidal Marsh becoming a protected resource, thus allowing tidelands to be placed in Resource Production. Agricultural and orchard acres remained stable with very little variation demonstrated in survey statistics. Water: and Unclassified decreased by 15% with several areas revealing a decrease of over 30%. Primary responsibility for the dramatic loss is due to the removal of Tidal Marsh from this category. Unclassified areas sustained the loss with water remaining the same. HARRISON COUNTY As stated previously, base figures for Harrison County were.obtained in 1969 with later statistics,being accumulated in 1972. Harrison County has four incorporated cities; Biloxi, Gulfport, Long Beach, and Pass Christian, accounting for a major portion of the County's urban area. A comparison of base figures with present computations revealed no extraordinary trends (see Table 4). The county, while appearing to be economically diversified, is at present highly dependent on mil-itary activities. 22 Residential acreage showed an overall increase of 18% from 1969 to 1972 with the urban area showing the greatest increase (22%). This growth was considered healthy and in accordance with the regional plan. Rural residential acreage increased significantly due to the increase of non-farm residences and the influx of mobile home dwellers. Commercial acreage increased 13% through the County with a 9% gain in the urban area and a 29% gain in the rural area in the past three years (See Table 5). Commercial acreage increased at a faster rate than anticipated in the land use plan, particularly in the rural area. 23 TABLE 5 HARRISON COUNTY RESIDENTIAL-COMMERCIAL ANALYSIS URBAN (incorporated area) No. of Acres Percent 1969 1972 Increase Residential 6,500.16 7,9.07.55 22 Commercial 997.73 1,084.50 9 RURAL (unincorporated area) Residential 5,564.94 6,331.78 14 Commercial 270.88 349.71 29 Industrial land use rose substantially in three years (15%). The main addition came with the development of the Long Beach Industrial Park. Public and Semi-Public land use sh,ow no appreciable increase; however, this does not indicate a lack of constructive activity in the category. New parks were constructed and others received much needed restoration efforts. Other public and semi-public activities involve plans for construction of the Coast Coliseum on Highway 90 in Biloxi and a new County Courthouse in Gulfport. Resource Production acreage increased by 3%. T his figure is substantial when theamount of, acres involved is considered, amounting to an actual increase of more than 5,000 acres. The tremendous increase is attributable to the addition of Tidal Marsh. Tide lands or those lands below ordinary mean high tide are now protected and regulated under 1973 state legislative action. Commercial and National forests remained constant with no noticable variance in the land use. 24 Water and Unclassified areas decreased 4% primarily because of tidal marsh being reclassified and placed in Resource Production. As other land uses expand, unclassified areas will obviously decrease. The ra te of decrease will be rapid as all unclassified lands are programmed to be integrated with productive land uses, as illustrated by tidal marsh being reclassified as Resource Production. JACKSON COUNTY Jackson County was the first County in the Region to adopt a County-wide zoning ordinance and subdivision regulations. Each of the three cities, Moss Point, Ocean Springs, and Pascagoula, have comprehensive plans and c orresponding zoning ordinances. Early action in land use controls has already made it possible to anticipate and avert potential problems. Survey data obtained in 1969 and again in 1972 revealed, as suspected, that Jackson County is growing rapidly in most areas. However, monitori ng of certain indicators revealed that accelerated growth has probably reached its peak and is now continuing at a more normal rate. Residential land use had a tremendous increase of 44% between 1969 and 1972. Survey findings also revealed a 30% increase in the total number of dwelling units within the same period. One explanation for a larger increase in residential acreage than in number of dwelling units is that 6 greater number of homes were being,built in the County where lot sizes tend to be larger than within the cities. The County economy has expanded rapidly and in an effort to keep up with this expansion' developers have worked vigorously to provide a supply of residential property adequate to meet current demands. Commercial land uses showed an increase of approximately 13 percent. This in- crease was essential in order to supply the rapid residential growth with goods and services. Even with comprehensive zoning to regulate and guide commercial expansion, portions of this increase arE. seen as ",strip commercialism" resulting 25 from the continuing development of commercial property along U. S. Highway 90 between the cities of Ocean Springs and Pascagoula. Industrial land use increased by 8% as the County continued to broaden its economic base. To the.already existing industrial areas around Bayou Casotte, Moss Point and Ingalls shipyards, other plans were developed for additional industrial acreage. Public and Semi-Public land use was 3% over the previous survey computations of 1969. The creation of the Gulf Islands National Seashore Park, although not appreciably increasing land area, was a monumental change. The on shore operations for the National Park was formerly the Magnolia State Park located adjacent to Ocean Springs and bordering the Mississippi Sound. Other areas where increases occurred were in public utilities and services. Resource Production remained a stable land use with the exception of the addition of Tidal Marsh which amounted to over twenty-seven thousand acres (20%), emphasizing the timeliness of recent state legislation to preserve coastal wetlands in the region. Water and Unclassified areas had an over-all decrease of 9%, with the largest loss attributed to the removal of Tidal Marsh from this category. Increased residential land use also accounted for a protion of the decrease. The reduction of acreage in this land use was not unexpected, but predicted, in order to remain consistent with the Regional Land Use Plan. Unclassified areas incurred the decrease, while water areas remained virtually the same. OFFSHORE ISLANDS There are six islands located in Mississippi Sound which must be given consideration in light of the purpose of this project,'Petit Bois, Horn, Round, 26 Deer, Ship and Cat Islands. Of these islands only Deer Island was placed in the existing and future land use computations, due to its proximity to the mainland and the City of Biloxi. Petit Bois, Horn, and Ship Islands have been placed in the National Park system by congressional action; these islands are now part of the Gulf Islands National Seashore. Plans are-being prepared now to develop the islands for recreational purposes including overnight camping, fishing, swimming and related activities, with visits to Ship Island and historic Fort Massachusetts. Round Island, one of the smaller and less significant islands, serves as an ideal area to be preserved in its natural state. Cat Island, though privately owned, has seen limited development in recent years. The area has been subdivided into lots for summer home dwellings and includes a series of dredged canal s for residential docking facilities. 27 SIGNIFICANT MAN-MADE COASTAL RESOURCES TRANSPOR TATION Transportation within the study area involves a series of networks and systems that occupy approximately 36,600 acres of land excluding those requirements of airports. STREETS AND HIGHWAYS A Gulf Coast Area Transportation Plan developed for the GRPC in 1971 identified and classified each transportation route within the urban area. Also included were projections and roadway classifications which would be needed to meet future demands. Major roadways are defined categorically as they relate to areas they serve. Collectors move traffic within communities. They tie in with arterials which transfer traffic over larger areas and between communities. These in.turn may connect with freeways, interstates or expressways. Freeways, interstates and expressways are controlled access routes designed to move larger volumes of traffic at maximum speeds. AIRPORTS The three county study area is co mprised of three distinct types of airport facilities: Air Carrier Facilities, General Aviation Facilities and Military Installations. This grouping is necessary and significant in terms of the traffic levels handled by such installations, by the types of aircraft which make use of these various airfields, by the runway, airspace and terminal requirements, and by the degree and type of interaction with other fields in the area. Z8 The air carrier airports are located to serve large concentrations of population and/or commerce, mainly because that is where the demand for their services exist. They require runways of considerable length, width, and some type of instrumentation and lighting, as well as passenger terminal and/or cargo handling facilities, and adequate ground access. These facilities do, however, accommodate and encourage operations by general aviation aircraft. Presently only the facility at Gulfport, serving most of the coastal area falls into this category. General aviation airports may and frequently do serve smaller population centers or industrial or recreational areas. These airports generally require less run- way width, length and strength. Sbme have runway lighting and a published VOR or ADF approach. Such airports are owned and operated by municipalities as well as private individuals. Those in the study area which fall into this group include the Stennis International Airport, Diamondhead Airport in Hancock County, the Gu lf Park Facility east of Ocean Springs and the Jackson County Airport. Within the general aviation grouping, one must further distinguish between "public" and 11private" use airports. The former (o f interest in this study) serve aviation by offering services, charter, rental, instruction, etc. to the public. The latter are relatively few in number in the Gulf Coast Region and do not offer service to the public. Although patronage of the public is not solicited by private fields, they are available to any aircraft in case of emergency. Finally, military installations must be considered in relation to operations of military flight missions within the study area. Here only Keesler Air Force Base need be considered. RAILROADS Within the three counties there are three railroads, the Louisville and Nashville, Illinois Central Gulf and the Mississippi Export. 29 The Louisville and Nashville generally follow the coastline east and west connect- ing the coastal municipalities with New Orleans and Mobile and all connecting points. The Illinois Central Gulf which is located in Harrison County (Gulfport) and extends northward to Hattiesburg, Jackson areas. The Mississippi Export railroad serves the Jackson County area connecting Pascagoula and Moss Point with Lucedale in Stone County and interconnecting with the Gulf Mobile and Ohio Railroad near Lucedale. A general increase in rail passenger service in the area is not anticipated. How- ever, efforts being sponsored by the Mississippi Coast Transportation Authority and other interested groups are currently underway to determine the feasibility of establishing passenger service between Ingalls Shipbuilding facility and strategic points along the Coast. CHANNELS Navigation channels maintaine d by the U.S. Army Corps of Engineers provide access to and through all of the major bays and harbors in coastal Mississippi. Most of th ese are of long standing with existing authorized projects dating back to 1890. Continuing maintenance is required in nearly all channels. The resultant spoil banks have changed the circulation in some areas of the Sound. Although some of the original construction was accomplished by private interests, the Corps of Engineers has accepted responsibility for their maintenance. Long range master plans for industrial development have been prepared by agencies in each of the coastal counties. These plans call for extensive dredging and filling to produce waterfrontindustrial sites. Most of these plans locate access channels and expansion in or near existing navigation channels. 30 Table 6 and Map 1 show the location and some dimensions of existing channels. Unless otherwise indicated, most of the data in the following-discussions are taken from 1966 project maps and data sheets furnished by the Mobile District, U. S. Army Corps of Engineers. GULF INTRACOASTAL WATERWAY The Gulf intracoastal waterway provides a protected channel 12 feet deep and 150 feet wide along the entire coastline of the State of Mississippi. Tremendous traffic demands of World War II resulted in an authorization in 1942 to enlarge the channel to its present dimensions. The work was co mpleted in 1943. The waterway links all ports along the Mississippi Gulf Coast with inland water- way systems emptying into the Gulf of Mexico. Maintenance dredging is required only in the Pass Marianne-Grand Island sections of the channel in the west end of the Sound. Spoil areas are located south of the Grand Island Channel near the Mississippi-Louisiana state line. 31 . . . ...... . .... . . ....... . .. . ..... .. .. . ... .. . ....... . .......... RtE, 42 IN, .. . ....... 31 ....... . . . . . M kj, Ce. TABLE 6 NAVIGATION CHANNELS MAP CODE NAME IN THE MISSISSIPPI SOUND L W D S 11 Gulf Intra-c6astal Waterway, 150 12 A Mississippi Sound 2 Pascagoula Harbor A. Entrance Channel, west end of Petit Bois Island 2.0 350 40 A B. Pascagoula Ship Channel, Horn Island Pass to Pascagoula 12.0 350 38 A C. Bayou Cassotte Channel, mile 7 on Pascagoula Channel to Bayou Cassotte, including harbor 4.4 225 38 A D. Pascagoula River-Escatawpa Channel, Pascagoula to Highway 63 Bridge on Escatawpa 6.0 125 22 A E. Escatawpa Rive r, Highway 63 Bridge to mile 6 4.0 125 12 A 3 Pascagoula River A. Mouth to Escatawpa to Dead Lake 27.0 - 12 B B. Dead Lake to Merrill 47.0 - 3 B. 4 Bluff Creek Mouth of creek on West Pascagoula River to Vancleave 10.0 - 7 B 5 Biloxi Harbor, Mississippi Sound West of Deer Island to Bayou Bernard 23.0 150 12 A 6 Harrison Industrial Seaway, Biloxi Bay East of Deer Island to Intracoastal Waterway 11.9 150 12 A 7 Gulfport Harbor A. Sh.ip Island Bar Channel, west end of Ship Island 8.0 300 32 A B. Gulfport Ship Channel, Ship Island to .Gulfport Harbor 11.0 220 30 A 8 Pass Christian Harbor, 7-foot isobath in Mississippi Sourrd'to Harbor - 100 7 A 9 Wolf And Jourdan Rivers A. Wolf River, St. Louis Bay to Wolf River 1.6 100 6.5 A B. Jourdan River, St. Louis Bay to Jourdan River 2.0 100 7.0 A 10 Ott Bayou east and west access channel 150 12 A 11 East Pearl River, River entrance 1.3 200 8.3 A 12 Industrial Seaway, Back Bay Biloxi to Bayou Bernard 5 150 12 A LEGEND L-Length in statute miles, W-Width, D-Depth in feet, S-State of Completion (A-Completed, B-Maintenance Only, C-Authorized, D-Proposed) SOURCE Corps of Engineers 33 PASCAGOULA HARBOR The Pascagoula Harbor is located along the lower 6.8 mi. of the Pascagoula River the lower 6 mi. of Escatawpa (Dog) River, and on Bayou Casotte. The project provided for: (a) an entrance channel 40 ft. deep and 350 ft. wide from the Gulf of Mexico through Horn Island Pass, including an impounding area for littoral drift 40 ft. deep, 200 ft. wide and about 1,500 ft. long adjacent to the channel at the west end of Petit Bois Island; (b) a channel 38 ft. deep and 350 ft. wide in Mississippi Sound and Pascagoula River to the railroad bridge at Pascagoula' including a turning basin, 2,000 ft. long and 950 ft. wide (including channel area) on the west side of the river below the railroad bridge; (c) a channel 38 ft. deep and 225 ft. wide from the ship channel in Mississippi Sound to the mouth of Bayou Cassotte, thence 38 ft. deep and 300 ft. wide for about 1 mi. to a turning basin 38 ft. deep, 1,000 ft. wide and 1,750 ft. long; (d) a 22 x 150 ft.. channel up the Pascagoula River from the railroad bridge to the mouth of Dog River, thence up Dog River to Highway 63 bridge; and (e) a 12 x 1.25-ft. channel from the highway bridge, via Rober tson and Bounds Lakes, to mile 6 on Dog River. The length of all the Channels in this project is about 28 mi. (U.S. Army Corps of Engineers 1965). Expansion of the Pascagoula harbor has been accomplished by the State of Mississippi by dredging a deep water channel and harbor west of the Pascagoula Channel at the mouth of the River. This facility was built to accommodate Litton Industries.' "shipyard of the future". Spoil banks are located along the wes t side of the channel from the mouth of the river to Petit Bois Island, disrupting the westerly flow in the sound. All east-west- traffic between Spanish Point at the mouth of the river and the Intracoastal Waterway is rqquired to find a designated channel through the spoil banks. Numerous islands have been built up in the spoil area. Similar conditions have been developed on the east side.of the Bayou Casotte section of the project. 34 PASCAGOULA RIVER The exi sting Pascagoula River navigation project provides for maintenance of the channel above the mouth of Escatawpa (Dog) River to mile 81 at the junction of the Leaf and Chickasawhay rivers. In recent years, maintenance has been s pasmodi,c because of reduced; traffic. BLUFF CREEK The current Bluff Creek project was authorized in 1890. It provides for the removal of obstructions from the mouth of the creek on West Pascagoula River to Vancleave, a distance of about 10 miles. With the decrease in logging opera- tions along the stream, abandoment was recommended. However, a small industry was developed near Vancleave and maintenance was resumed in 1958. BILOXI HARBOR The first project for Biloxi Harbor was adopted in 1882. The presen t project provides for a continuous channel about 23 miles long, 12 feet deep and 150 feet wide fro m the Mississippi Sound passing west of Deer Island to the 12-feet depth in Back Bay, thence 12 feet deep and 100 feet wide in Back Bay, Cranes Neck and Bayou Bernard to the Air Force Terminal about mile 2.6. Maintenance of the East Access Channel through Biloxi Bay and across Mississippi Sound east of Deer Island to the Intra-coastal Waterway (constructed by state funds) has been accepted by the Corps of Engineers. Deepening and widening of the channel to accommodate ships is provided for in the plans. Spoil areas are located south and west of the Industrial Waterway in Biloxi Bay and Mississippi Sound. In the Biloxi Harbor entrance channel west of Deer Island, spoil is pumped to the east and deposited off the west end of Deer Island. Continuing maintenance is required in Bay and Sound channels. Some spoil areas in the Bay have been built up above the water surface. 35 GULFPORT HARBOR The Gulfport Harbor Project was first adopted in 1899. The present authority for channels 32 ft. deep and 300 ft. wide across Ship Island Bar and 220 ft. wide by 30 ft. deep across Mississippi Sound. The Gulfport anchorage basin is 30 ft. deep, 1,320 ft. wide and 2,640 ft. long. 'An 8-ft. channelis maintained into the 26-acre commercial small craft harbor west of the anchorage basin. Spoil areas, with provision for maintenance of the Intracoastal Waterway where it crosses the Gulfport Channel, extend across the Sound on both sides of the Channel. PASS CHRISTIAN HARBOR The Pass Christian Harbor, 1,000 ft. long and 700 ft. wide, is provided with an entrance channel to the 7-ft. contour in Mississippi Sound. There is a small spoil area along the beach west of the harbor. WOLF AND JOURDAN RIVERS The Wolf and Jourdan River Channels were completed in 1908. Channels extend from the 6-ft. contour in St. Louis Bay to the 7-ft. contour in each stream. Spoil areas extend along the Bay side of each channel. EAST PEARL RIVER A dredged channel 9 ft. deep provides access to the mouth of East Pearl River at the Mississippi-Louisiana state line. PEARL RIVER A navigation channel from the mouth of West Pearl River in Louisiana to Bogalusa, Louisiana was authorized in 1935. It was completed in 1953. A lateral canal from the mouth of Holmes Bayou to Pool's Bluff provides three locks. 36 HANCOCK COUNTY DEEP WATER ACCESS Long-range plans of the Hancock County Port and Harbor Commission include a ship channel from the Gulf of Mexico south of Ship Island to harbors and industrial sites in Hancock County. These plans include a 150- by 12-ft. access channel into St. Louis Bay. Construction of shallow draft channels and harbor in southwest Hancock County with state funds is well advanced. Spoil areas for the proposed channel extend along the south side. BAYOU PORTAGE The Bayou Portage Channel, constructed and maintained by local interests, provi des an 8- by 100-ft. channel from St. Louis Bay to the Pass Christian industrial area. Spoil areas are located in St. Louis Bay. OTHER There are many miles of dredged channel connecting private property to natural waterways in all areas of the Gulf Coast. These channels have been cut through marshes and natural channels, in most cases for the purpose of producing water- front property in housing project areas. INTERIOR NAVIGATION Ocean transportation routes,though not specifically identified, provide access to the two major commercial harbors-previously mentioned. Interior navigation routes must be given special attention, however, because of their ability to provide access to an unlimited number of inland destinations. Mississippi,State Laws define navigable streams as follows: All rivers, creeks and bayous in this state, twenty-five miles in length that have sufficient depth and width of water for thirty 37 consecutive days in the year for floating a steamboat with carrying capacity of two hundred bales of cotton.... (Mississippi Code 1972 51-1-1.) While it appears that this definition is somewhat antiquated, it is in keeping with navigable limits as defined for the purpose of this report. Navigable limits as referred to he rein mean those points on major streams beyond,I which it is hazardous for commercial fishing boats or industrial barges to proceed. ELECTRICAL ENERGY GENERATION Parts of the following information were prepared by the Mississippi Power Company at the request of Gulf Regional Planning Commission. For this report only those facilities within the three coastal counties were addressed and limited to the basic facilities. DESCRIPTION OF EXISTING POWER COMPANY GENERATING FACILITIES At Plant Jack Watson, located near Gulfport and Biloxi, there are two 75,000 kilowatt units, one 112,000 kilowatt unit,- one 250,000 kilowatt unit, and one 500,000 kilowatt unit, all of which are steam electric turbin generators, and one 39,360 kilowatt combustbn turbin in service. Primary and alternate fuels used in the Company's generating stations vary in the different plants. At Plant Jack Watson the two 75,000 kilowatt units and the one 112,000 kilowatt steam units and the 39,360 kilowatt combustion turbine utilize gas as the primary fuel and No. 2 oil as the alternate fuel. The 250,000 kilowatt unit uses coals as the primary fuel with natural gas as the alternate fuel and the 500,000 kilowatt unit uses coal as its fuel with no alternate provided. Natural gas at this location is being increasingly curtailed by the supplier. 38 PLANNED NEW GENERATING FACILITIES The Mississippi Power Company has underway the construction of two new 500 MW steam-electric generating units stationed in Jackson County. The Company's designation of the initial units is Jackson County Steam Plant - Unit No. 1 and Unit No. 2. The site i,s located approximately 11 to 12 miles north of the city of Pascagoula and lies on the east bank of the Pascagoula River. The site encompasses approximately 3000 acres. Site investigation and clearing was initiated in 1972 and construction of the facilities began in 1973. Construction is scheduled for completion of Unit No. I in 1977, and completion of Unit No. 2 is schedul ed for 1979. For the operation of the plant, average monthly water balance studies indicate that 11.45 MGD of make-up water for the closed cooling system will be withdrawn from the Pascagoula River. This make-up will be needed in addition to the water added by rainfall and water shed to equate the losses due to evaporation and seepage. The ultimate plant site generating capacity would require an estimated with- drawal rate from the Pascagoula River of 74.55 MGD of which 14 MDG will be returned. The boilers will be arranged to have the capability of being fired with either fuel oil until late 1978, after which coal would become the primary fuel. Unit No. 2 is expected to use coal as the primary fuel when it begins operation in early or mid 1979. 39 SIGNIFICANT NATURAL COASTAL RESOURCES Significant natural resources are generally identified as beaches, barrier islands, wetlands, certain upland areas, coastal waters, natural harbors and sand dunes. To meet the requirements of other portion s of the'Coastal Zone Management Act, a major portion of these natural areas have been identified. Listed in the draft Interim Report on Geographic Areas of Particular Concern Priority of Uses and Areas for Preservation an d Restoration in the Mississippi Coastal Zone, MMRC Report CZM 002, were twenty-six areas of concern. Of these twenty-six areas, eleven of the areas could, without debate be classed as "significant natural areas." The eleven geographic areas of concern categories that fall within the natural coastal resource classification are: (1) Coastal Wetlands and Estuaries (2) Freshwater Swamps and Marshes (3) Surface Waters (4) Natural Rivers (5) Significant Beaches (6) Mineral Resource Areas (7) Shellfish Habitats (8) Saltwater Fish Habitats (9) Freshwater Fish Habitats (10) Areas that sustain Remnant Species (11) Significant Flora Two additional coastal resource types that should be added to the above list that were not directly identified in the geographic areas of particular concern report are barrier islands and uplands. 40 The barrier islands, Ship, Cat, Horn and Petit Bois, and,including part of Dauphin Island in Alabama, encompass the Mississippi Sound. They were formed during the last glacial period (Pleistocene). Only Cat Island, south of Long Bea.ch-Gulfport, remains in private ownership. The other islands are part of the Gulf Islands National Seashore group. Uplands, generally described for purposes of this plan are "those lands above the water mark of ordinary high tide". A brief description of the above identified "natural coastal resources" are explained below. These areas have been previously mapped and are included in the geographic area of concern draft report. 1. COASTAL WETLANDS AND ESTUARIES Coastal Wetlands are publicly owned lands subject to the ebb and flow of the tide which are below the watermark of ordinary high tide, all tidal influenced riverine systems and all publicly owned accretions above the watermark of ordinary high tide. An estuary is that part of a river or. other body of water having unimpaired connection with the open sea, where sea water is measurably diluted with fresh water derived from land drainage. 2. FRESHWATER SWAMPS AND MARSHES Swamps are areas of water saturated ground. They are usually found within the flood plains and are characterized by a high water table, predominately internal drainage and water-tolerant vegetation. 3. SURFACE WATERS Surface waters are waters occurring in any watercourse, lake or other natural. water body of the State as delineated by the Board of Water Commissioners. 41 4. N@TURAL RIVERS To be classified under the Wild and Scenic Rivers Act of 1968 a river must be in a free flowing condition. There are three classifications of natural rivers (1) wild, (2) scenic, and (3) recreation. 5. SIGNIFICANT BEACHES Significant beaches are land areas without vegetative covering, consisting of unconsoli,dated soil material that extends landward from the mean low tide to a point where any one or a combination of the following occur: (1) vegetation or (2) a distinct change in predominant soil particle size or (3) a change in slope or elevation which alters the physiographic land form and this constitutes the transition into dunes or wetlands. 6. MINERAL RESOURCE AREAS Mineral resource areas are those areas where the mineral accumulation is of sufficient size or significaiceto be of more than just local importance and where the mineral is apt to be exploited in the near future and where mining or excavation operations would cause some disruption of other land use activities at the site while mining or excavation is in progress. 7-9. HABITATS OF MAJOR FISHERIES Habitats,of major fisheries are divided into three elements: (1) shellfish, (2) saltwater finfish and (3) freshwater finfish. Shellfish habitat - these are areas where oysters grow in sufficient quantity to be harvested commercially. Saltwater fish habitat - these are areas recognized for their propogation of the seafood and aquatic life in the State of Mississippi. Freshwater fish habitat - these are areas that constitute a vital segment of the State of Mississippi. 42 10. AREAS THAT SUSTAIN REMNANT SPECIES Areas that sustain remnant species are areas where species or subspecies of wildlife indigenous to the state may be found to be endangered within the state and should be accorded protection in order to maintain and, to.the extent possible, enhance their numbers. 11. SIGNIFICANT FLORA These are areas which contain rare, unique or endangered flora indigenous to the state. 43 INDUSTRIAL PARKS AND INDIVIDUAL SITES Land use surveys conducted in 1972 by the Gulf Regional Planning Commission indicated that over 10,000 acres in Hancock, Harrison, and Jackson Counties were being utilized for industrial purposes. These uses ranged from small insignificant sites such as borrow pits and automobile junk yards to major industries like the Ingalls Division of Litton Shipbuilding in Pascagoula. The purpose of this section is to generally identify industrial areas in the three coast counties. Industrial land uses were grouped into two segments cover- ing individual industries of major significance and both existing and proposed industrial parks. INDIVIDUAL INDUSTRIES Individual industries are listed on the following table (Table 7) which includes this site name, number of employees, industrial products and corresponding stand- ard industrial classification (SIC). Acreage on these individual sites was not obtained, however, the general location and size of the sites can be found on maps at the offices of the Mississippi Marine Resources Council. INDUSTRIAL PARKS The term indu strial parks as used in this report has two connotations - industrial parks and industrial districts. Parks may be defined as those areas legally delineated and subdivided, cleared and made void of non-conforming.land uses, equipped with various facilities, utilities and services optionally supplied in parks, and otherwise made ready fo r immediate occupancy by industrial firms. Industrial districts may be defined as those areas which have been legally set aside or zoned for industrial use. Unlike parks, districts, used in this context, may or may not have other land uses occupying space inside the district limits. 44 Industrial park data are summarized in Table 8. Individual parks are identified by name, township codes, and owners. Other data include park size and available acreage, existing utilities and services,' water use and discharge and types of. available transportation. Also shown is the industrial park or district classification. 45 PARKS AND RECREATION Recreational movements and activities are profoundly affected within any given area by trends in growth and development. Industrialization, commercial- ization, population concentrations and shifts, and urban and sub-urban develop- ment are most often accomplished by the absorption of open space. This being true, it can be said that grow th patterns are directly influenced by avail- ability of open space. It follows logically that planned and managed open space in turn can influence growth patterns, adding further emphasis to the importance of a regional plan for open, space management and conservation. Recreational trends also reflect patterns of increasing personal income, and an increasing involvement of the private sector in recreation-oriented development. Other more subtle factors which exert an influence on recreation desires, activi- ties, and potentials include governmental policies and on going recreation programs. Concern on the part of public officials is reflected in the numerous park and playground commissions active in most municipalities throughout the region. In order to provide an overview of existing public recreation facilities, Table 9 was developed. Data reflected therein are the results of work performed in the summer of 1975 by the Gulf Regional Planning Commission. Only public recreation and major semi-public and commercial activities are identifi ed. 46 TABLE 7 REGIONAL INDUSTRIAL SITES NO. OF sic SITE NAME EMPLOYEES PRODUCT CODE HANCOCK COUNTY UNINCORPORATED J. L. Fabricating, Inc. 50 Steel Fabrication 3441 Jackson Landing Shipyard 150 Petroleum Barges 3731 PASS CHRISTIAN HARRISON COUNTY Pass Christian Industires, Inc. 495 Ladies Jeans & Shirts 2339 Gulf Coast Pre-Stress Co., Inc. 79 Pre-stress concrete products 3272 GULFPORT Masonite Corp..- Alpine Division 9 Phenol Formaldehyde resin 2821 Phenol Formaldehyde adhesive 2891 Bayou Steel Corp. 63 Boats & Barges 3732 Drilling Platform Components 3533 Chattanooga Glass Company 234 Glass Bottles 3221 Chemfax, Inc. 41 Petro. Hydrocarbon Resin. 2821 Clearspan Components, Inc. 98 Wall & Roof Trusses 2452 -Windows & Doors 2431 Coast Coca-Cola Bottling Co. 56 Soft Drinks 2086 Coast Materials Co. 50 Ready-Mixed Concrete 3273- Colonial Baking Co. 130 Bread & Rolls 2051 Conalco-Olin Corporation 168 Aluminum extrusions 3354 Glenbrook Laboratories - Sterling Drugs 85 Laxatives 2834 Gulf Coast Tool & Die Ltd. 100 Metal Stampings 3469 Custom Machine Tools 3544 Gulf Paving, Inc. 125 Asphaltic Concrete 2951 NATCO 231 Steel Fabrication 3443 Gulfport Creosoting Co. 86 Treated Pine Poles 2491 KUDA, Inc. No. 1 52 Ladies & Mens Apparel 2331 Marine Systems 50 Metal Fabrication 3441 Wood Fabrication 2431 Maybelle Dress Mfg. Co., Inc. 200 Ladies Apparel 2339 PACECO 205 Heavy Steel Fabrication 3441 Barges & Tugboats 3731 Plastifax,Jnc. 24 Chlorinated Paraffin 2865 Metal Soaps 2869 Reichhold Chemicals, Inc. 71 Hydrocarbon resins 2821 Antioxidants 2869 Southern Precision Steel Co. 130 Cold-finished carbon & alloy bars 3316 Struthers Wells-Gulfport, Inc. 117 Sewage treatment equipment 3443 Teledyne Irby Steel 200 Pressure vessels & Steel fab-3443 rication McElroy Machine & Mfg.Co. 23 Marine Wenches Marine Propellar Shafts Miss.Power Co. -Plant Jack Watson Electrical Generating Plant 47 REGIONAL INDUSTRIAL SITES (Continued) SITE NAME NO. OF sic EMPLOYEES PRODUCT CODE BILOXI Barq's Bottling Co. 50 Soft Drinks 2086 Biloxi Pre-Stress 47 Pre-stressed concrete product3272 Borden Company 90 Dairy Products 2026 C.C. Company, Inc. 75 Canned Seafood 2091 Clements Wire Mfg.Co. 51 Automotive Wire Harness 3714 DeJean Packing Co., Inc. 60 Canned Seafood 2091 Cat Food 2047 Del's Seaway Shrimp & Oyster Co. 150 Frozen Shrimp & Oysters 2092 R. Fournier & Sons 40 Shrimp,, Crab & Crab meat 2092 C.F. Gollott & Son Seafood Co. 35 Shrimp, Crab & Crab meat 2092 E.M. Gollott & Son Seafood Co. 18 Frozen Shrimp 2092 Gollott & Canaan Seafood Co. 15 Frozen Crabmeat & Oysters 2092 The M.H. Graham Corp. 85 Electrical Appliances 3634 Household Metal Products 3469 Gulf Publishing Company, Inc. 270 Newspaper 2711 Leckich & Fayard Seafood Co. 115 Frozen Shrimp 2092 Mavar Shrimp & Oyster Co., Inc. 100 Canned Shrimp & Oysters 2091 Moore Seafood Co. 55 Canned Shrimp 2091 Frozen Shrimp 2092 Shemper Seafood Co. 75 Frozen Seafood 2092 West Seafood Co. Seafood Products 2092 Kulji's Seafood & Ice Co. Seafood Products 2092 Sea Coast Company Seafood Products 2092 Cruso Canning Company Canned Seafood 2091 Weems Bros.Seafood Co. Seafood Products 2092 L.D. Gollott Seafood Co. Seafood Products 2092 Swarez Seafood Co. Seafood Products 2092 E.R. Gollott Seafood Co. Seafood Products 2092 Hygiene Shell Co. Seafood Seafood Products 2092 Southern Shellfish Co. Seafood Products 2092 Bayview Foods, Inc. Biloxi Canning & Packing Co.,Inc. Seafood Products 2092 JACKSON COUNTY OCEAN SPRINGS Coca Cola Bottling Co., Inc. 49 Soft Drinks 2086 Ferson Optics 211 Optical Equipment 3832 E. R. Moore Co. 98 Ladies Gym Suits 2339 Academic Gowns 2389 Toche Enterprises, Inc. 82 Steel Seagoing Vessels 3732 GAUTIER Delta Creosoting Co., Inc. 42 Creosote piling,poles,post, 2491 MOSS POINT Crossfield Products Corp. 7 Latex Industrial Flooring 2851 The Fishmeal Co., Inc. 70 Menhaden Fish Meal 2077 48 REGIO-NAL INDUSTRIAL SITES (Continued) SITE NAME NO. OF Sic EMPLOYEES PRODUCT CODE MOSS POINT continued Halter Marine Fabricators, Inc. 350 Offshore Supply Ships 3731 International Paper Company 1504 Paper Products 2621 J.M. Rogers & Sons, Inc. 82 Lumber 2426 Wood Pollets 2448 Standard Products, Inc. 47 Fish Meal & Oil 2077 Thiokol Corp. 178 Polysulfide rubbers & 2822 Polyacrylates Mississippi Export Railroad Zapata-Haynie Products 76 Menhaden fishmeal & oils 2077 Webb Paving Asphalt Paving Cumbest Manufacturing Co.,Inc. Lumber 2421 PASCAGOULA Bayou Crab.Company 70 Processed Crabmeat 2091 Cinderella Knitting Mills 400 Men & Boy's Knit Underwear 2322 ,.Continental Can Company, Inc. 135 Metal Bottle Caps 3466 Corchem Division of Corhart Refract- ories Co. 80 Magnesium Oxide & dolomitic 2819 First Miss. Chemical Corp. 48 Orthotoluidine 2865 Frigitemp Marine Division 550 Ship sheet metal work 2599 furniture, etc. Gulf City Fisheries -400 Fresh & Frozen Seafood 2092 Ingalls Shipbuilding Division 19000 Naval & large commercial vessels 3731 Miss. Chemical Corporation 535 Fertilizers 2873 Sulfuric Acid 2819 The Miss. Press Register 92. Newspaper 2711 Pavco Industries, Inc. 1.40 Plywood paneling 2435 Sanded hardboard 2426 The Quaker Oats Co. 175 Canned cat,& dog food 2047 Standard Oil Co.. 620 Petroleum Fuels 2911 F.B. Walker & Sons Shipyard 99 Boat Building 3732 Castigliola Seafood Products 2092 Clark Seafood Seafood Products 2092 Graham Boats, Inc. Boat Building 3732 SOURCE: Parametric Overview of Land Use and Socio-Economic Activities, 1976, Gulf Regional Planning Commission 49 TABLE 8 INDUSTRIAL PARK SUMMARY HANCOCK, HARRISON AND JACKSON COUNTIES GULF REGIONAL PLANNING COMMISSION - JANUARY 1976 Water Waste Transportation Size Occupied Available UTILITIES Used Discharge Rail Roads NAME OWNERSHIP (Acres) Acreage Acreage Water Gas Electric Se@ie_r (gal/day) (gal/day) -water- Air Remarks HANCOCK COUNTY Port Bienville Ind. Park Hancock County 1460 291 1169 x x x x 8,000 2,000 x x x Industrial Park HARRISON COUNTY Pass Christian Ind. Park Harrison County 190 94 96 x x x x 10,500 x x Industrial Park Long Beach Ind. Park Harrison County 500 0 500 x x x x Industrial Park Bayou Benard Ind. Park Harrison County 1450 949 501 x x x x 100,000 x x x x Industrial Park East Harrison Co. Ind. Park Harrison County 83 33 50 x x x x 9,600 x x Industrial Park JACKSON COUNTY Ocean Springs Ind. Park Jackson County 15 6 9 x x x x x Industrial Park Bayou Casotte Public Terminals Jackson County 25 0 25 x x x x x x Industrial Dist. Bayou Casot te No. I Jackson County 242 0 242 x x x x x x x Industrial Dist. Bayou Casotte No. 2 Jackson County 649 4 645 x x x x x x x Industrial Dist. Greenwood Island Ind. Park Jackson County 311 0 311 x x x x x x x Industrial Dist. West Bank Ind. Park No. 1 Jackson County 6 0 6 x x x x x x Industrial Di st. West Bank Ind. Park No. 2 Jackson County 65 0 65 x x x x Industrial Dist. TOTALS 4996 137-7 -161-9 SOURCE: 1. Miss. Research & Development Center, Long Beach - General Information 2. Hancock County Port & Harbor Commission Water Use & Discharge 3. Harrison County Development Commission Water Use & Discharge 4. Jackson County Planning Commission - General Siting Information 50 TABLE 9 REGIONAL PARKS & RECREATION AREAS FACILITY NAME TYPE OF FACILITY OWNERSHIP@ ... ACREAGE HANCOCK COUNTY BAY ST. LOUIS Bay High School School Playfield City School System 15 Bay Jr. High School Playfield City School System 4* North Bay Elem. School School Playground City School System 5 Christ Episcopal Parochial School Playground Church 4 Devine Word Seminary Parochial School Playfield Church 3 Our Lady of the Gulf Parochial School Playground Church 2 St. Joseph Academy Parochial School Playground Church 4 St. Stanislaus College Parochial School Playfield Church 25 Ingram Elem. School School-City Playground City of Bay St.Louis 1 Dunbar & Ulman Field City Playfield City of Bay St.Louis 2 Julia & Dunbar Park City Mini-Park City of Bay St.Louis I Main & Necaise Park City Mini-Park, City of Bay St.Louis I St.Francis & Bookter Park City Mini-Park City of Bay St.Louis I WAVELAND Waveland Elem. School School Playground City School System 3 St. Clares' Elem. School Parochial School Playground Church 3 Elmwood Park City Playfield & Park. City of Waveland 5 UNINCORPORATED AREA Hancock North Central School School Playfield & Playground County School System 30 C. B. Murphy School School Playground County School System 3 Hancock Co. Beaches Public Beach County 135 Buccaneer St. Park State Park State of Miss. 394 PASS CHRISTIAN HARRISON COUNTY Pass Christian High School School Stadium City School System - Parker Memorial Park Community Playfield City of Pass Christian - Pass Christian Harbor Community Park City of Pass Christian 3 Harbor Park Community Park City of Pass Christian 25 Church St. Park Neighborhood Playfield City of Pass Christian 1 War Memorial Park, Neighborhood Playfield City of Pass Christian 5 Pass Christian Yacht Club Yacht Club & Marina Club-Semi-Public 3 LONG BEACH Long Beach High School School Playfield,Gym City School System - Tennis Courts & Stadium O'Malley Park Community Playfield City of Long Beach 10 Church Street Park Community Playground City of Long Beach 6 Skellie Park Neighborhood Playfield City of Long Beach 3 Railroad St. Park Neighborhood Playfield City of Long Beach 2 Long Beach Basketball Court Neighborhood Playfield City of Long Beach 1 Long Beach Recreation Center Recreation Center City of Long Beach I Small Craft Harbor Small Craft Harbor City of Long Beach 2 51 REGIONAL PARKS & RECREATION AREAS (Continued) FACILITY NAME TYPE OF FACILITY OWNERSHIP AVERAGE.7 HARRISON COUNTY GULFPORT Handsboro School School Playfield City School System 4 Anniston Avenue School School Playfield City School System 2 Mississippi City School School Playfield City School System 4 28th Street School School Playfield City School System 8 Gulfport High School Gym & Related Facilities City,School System - 'Gulfport East High School Gym, Tennis Courts & City School System Related Facilities Bayou View Jr.'High School Gym,Playfield & Related City School System Facilities Gulfport East Jr. High Gym, Tennis Courts & City School System Related Facilities West Gulfport Jr. High School Playfield City School System Milner Stadium Stadium City of Gulfport Fairgrounds Playfield Playfields & Fairgrounds City of Gulfport 26 33rd Avenue Playfield Community Playfield City of Gulfport 14 Bayou View Playfield Community Playfield City of Gulfport 8 Beach Blvd. Playfield Community Playfield City of Gulfport 18 Bayou View Park Community Park City of Gulfport 10 Westside Community Park Community Park & Center City of Gulfport 19 Gaston Point Playfield Neighborhood Playfield City of Gulfport 3 North Gulfport Playfield Neighborhood Playfield City of Gulfport 2 2nd Street Playfield Neighborhood Playfield City of Gulfport 3 Hill Park Neighborhood Park City.of Gulfport 37 Jones Park Memorial Park City of Gulfport 4 Broadmore Place Park Neighborhood Mini-Park City of Gulfport .3 19th Street Playfield Neighborhood Playfield City of Gulfport 3 East Side Mini-Park Neighborhood Mini-Park City of-Gulfport .5 Hewes Recreation Center Community Center City of-Gulfport 4 East Side Community Center Community Center City of Gulfport 5 Moses Pier Public Fishing Pier City of Gulfport - Small Craft Harbor Public Marina City of Gulfport 30 Gulfport Yacht Club Yacht Club & Private Marina Yacht Club-Private 4 Bayou View Golf Course Golf Course Private-lease from Cityl40 Gulfport Par-Three Course Par-Three Golf Course Commercial 39 Broadwater Golf Course Golf Course Commercial 160 Marine Life Marine Aquarium Commercial 2 BILOXI Biloxi High School School Playfield & Related City School System - Facilities Central Jr. High School School Gym & Related Facilities City School System - Fernwood School School Gym & Related Facilities City School System - Michel Jr. High School. School Gym & Related Facilities City School System - Biloxi Municipal Stadium Municipal Stadium City of Biloxi - 'Hiller Park Community Park City of Biloxi @75 Tanglewood Community Park City of Bilo 1 2.5 X1 Brian Park Community Park & Center City of Biloxi - Circle Park Community Park City of Biloxi - Biloxi Community Center Community Center City of Biloxi - Division Street Community CenterCommunity Center City School System - Meault Center Community Center City of Biloxi - West Biloxi Center Community Center Lutheran Church - .52 REGIONAL PARKSA RECkEATION AREAS (Continued) FACILITY NAME TYPT OF 'F9 I LITY c7mr, HARRISON COUNTY (;'continued) ' BILOXI (Continued)_ East End Center Community Center City 'of Biloxi Back Bay LittI6 League Park Little League Playfield '-City of Biloxi 5.5 Lee Street Basbball Park Neighborhood Playfield City of Biloxi .5 McDonnell Playfield Neighborhood Playfield' city of Biloxi 7 Rose Street Playfield Neighborhood Playfield City of Biloxi 3.3 St. Michael Playfield Neighborhood Playfield City of Biloxi 3.5 West End Park d Little League Playfield City of Biloxi, 2.5 Business Men's'@Club Playground Neighborhood Playground City of Biloxi 3 St. Mary's Playground Neighborhood Playground City of Biloxi 1.5 y Biloxi International Plaza Neighborhood Plaza & Park city of Biloxi 2 Miramic Mini-PA.,rk Neighborhood Mini-Park City of Biloxi 1 Guice Park' Neighborhood Plaz.a-Park City of Biloxi I Biloxi Small Craft Harbor Small Craft Harbor & Marina City of Biloxi 12 Biloxi Fishing@Bridge Fishing Bridge City of Biloxi - Biloxi Yacht Club Yacht Club &,Marina Private 5 Broadwater Bea4h Marina Small Craft'Harbor Private-Commercial 10 Amusement Parkv Amusement Park Commercial 2 Deer Ranch Amusement Park Commercial 7 Goofy Golf Amusement Park Commercial 2 Broadwater Sun!Golf Course Golf Course Commerical 160 Edgewater Golf 'Course Golf Course Commercial 125 Sunkist Golf Course Golf Course & Club Private 120 UNINCORPORATEDtAREA Airey Lake Recreation Area Camping Picnic U.S.Forest Service 6 Big Biloxi River Recreation AreaCamping & Picnic U.S.Forest Service 27 Big Foot Horse Trail Riding Trail U.S.Forest Service 7 Tuxachanie Hiking Trail Hiking Trail U.S.Fbrest Service 17 Bil oxi Par-Three Golf Course Golf Course Commercial 32 Harrison County"Beach Public Beach Harrison County/Miss. - Saucier Little League Field Little League Playfield Unknown 2 D'Iberville Little League Field Little League Playfield Unknown 2 Lizanna Little League Field Little League Playfield Unknown 2 Orange Grove Little League Field Little League Playfield Unknown 2 Pineville Little League Field Little League Playfield Unknown 2 Harrison County,Fishing Pier Public Fishing Pier Harrison County 2 Camp Wilkes Boy Scout Camp Boy Scout Council 89 Harrison Centra'.1 High School School Playfield & County School System Related Facilities JACKSON COUNTY OCEAN SPRINGS Freedom Field School Playfield City School System 4 Vermont St. Pla@ground School Playground City School System 1 Greyhound Stadi"m Stadium City & School 19 Magnolia Park Community Park City of Ocean Springs 20 Pecan Park Community Park City of Ocean Springs 21 Little Children's Park Neighborhood Playground City of Ocean Springs 4 53 REGIONAL PARKS & RECREATION AREAS (Continued) FACILITY NAME TYPE OF FACILITY OWNERSHIP ACREAGE JACKSON COUNTY OCEAN SPRINGS (Continued) Ocean Springs Recreation Center Community Center City of Ocean Springs Parktown East Neighborhood Park City of Ocean Springs 3 Clayboy Park Neighborhood Playfield City of Ocean Springs 5.5 Hallstead Rd-Tennis Court Tennis Courts City of Ocean Springs 8 Ocean Springs Small Craft Harbor Small Craft Harbor City of Ocean Springs - MOSS POINT Mayo Elementary School Playground School Playground City School System 2 Bellview Park Community Park City of Moss Point 19 Mag nolia Park Community Park City of Moss Point 9 Curt Street Playfield Community Playfield City of Moss Point 13 Frederick St. Playfield Community Playfield City of Moss Point 10 Moss Point Recreation Center Community Center City of Moss Point .1 Gautier Field Semi-Public Playfield Dixie Youth Baseball League 4 St.Joseph Church Playfield Semi-Publie Playfield Chruch 2 PASCAGOULA Colmer Jr. High Playfield School Playfield City Schoql System 10 Pascagoula City Park Community Park City of Pascagoula 8.5 Davenpcrt Playfield Neighborhood Playfield City of Pascagoula 2 Flannegan Playfield Neighborhood Playfield City of Pascagoula 2 Gibson Playfield Neighborhood Playfield City of Pascagoula 2 Ingalls Playfield Neighborhood Playfield City of Pascagoula 2 John Ingalls Neighborhood Playfield City of Pascagoula 2 War Memorial Stadium Stadium City of PaIscagoula 4 Parsley St. Mini-Park Neighborhood Mini-Park City of Pascagoula I Live Oak Mini-Park Neighborhood Mini-Park City of,Pascagoula .5 Pascagoula Recreation Center Recreation Center City of Pascagoula 7 Pascagoula Inner Harbor Harbor & Marina City of Pascagoula 4 Longfellow House & Gardens Pool, Golf & Tennis Litton Industries 70 Pascagoula Country Club Golf Course Private Club 200 Aquatic Club Pool Swimming Pool Pirvate Club 1 Coastline Pool Swimming Pool Pirvate Club I Fun'Spot Miniature Golf Commercial 4 UNINCORPORATED Softball Field Community Playfield County-Comm"unity 10 Gulf Park Estates Marina,Golf Course & Pool Private Corporation Hickory Hills Country Club Golf Coruse & Pool Private Corporation St. Andrews onthe Gulf Golf Course, Tennis & Pool Private Corporation - Gulf Hills Dude Ranch Golf Course, Tennis & Stables Private Corporation 1000 Gulf Islands National Seashore Camping, 'Swimming, Fishing National Park.Service (Include Petit Bois, Horn and Ship'Islands) 54 PART III PERMISSIBLE LAND AND WATER USES 55 REQUIREMENTS OF THE CZM ACT The Coastal Zone Management Act requires that: The management (plan) must show evidence that the State has developed and alIpplied a procedure for defining.'permissible land and water uses within the coastal zone and which have a direct and significant impact on the coastal waters,' which includes, at a minimum: (1) a method for relating various specific land and water uses to impact upon coastal waters, including utili- zation of an operational definition of "direct and significant impact," (2) an inventory of natural and man-made coastal resources (see Part II), (3) an analysis or establishment of a method for analysis of the capability and suitability for each type of resource and application to existing, projected or potential uses, (4) an analysis or establishment of a method for analysis of the environmental impact of reasonable resource utilizations." Section 305(b)(2). 56 PURPOSE Two further tasks were performed in determining those uses which have a direct and significant impact on the coastal waters. The spcond@task was a determination of those land and water uses that would be assessed for potential, impact., These were based in part on fi.ndings from the resources inventory. After an initial determination of those possible uses which would be permissible, a tentative determination of "direct and significant impact" was developed. This definition was further modified and tested along with the result of the third task. 'For the third task, a method was needed to test these potential uses. This method, although not complete in every detail, attempts to establish an analysis of the capabi1ity of each resource to support various types of uses for sustained and undiminished yield of those renewable resources. Within this @ethod is included an analysis of the impact of various resource uses upon the natural environment (-air, land, water). 57 LAND AND WATER USES As an aid in evaluation of activities located or considering a location in the Coastal Zone of Mississippi, two matrix tables were developed. These are 0 contained in the appendix. Water uses were separated from land uses since the activities did not in themselves cause physical alteration of the shore- line, being primarily water-borne or located offshore where only bottom characteristics would be physically altered with possible attendant chemical and biological disturbance. LAND USE To determine the types of activities and nature of their physical facilities that were drawn to or of necess.ity required waterfront locations, an investiga- tion was made of existing development within the three coastal counties including: residential, commercial, processing and manufacturing (industrial), transportationY recreation and institutional uses. Also noted was the location, whether it abutted and/or occupied submerged lands of the state wetlands. In most in- stances, the use had caused some alteration of the shoreline. And, in several areas major changes were encountered. In every case direct and significant physical impact upon the state wetlands and coastal waters had occurred, with some indeterminate biological and chemical impacts as well. The 'T' array of the matrix is entitled Permissible Use according to the definition of such uses. This axis presents the social and economic activities. The "Y" array of the matrix is entitled Factors, presenting physical facilities and support services needed (also a form of activity) to susta-in the basic activities and considerations that influence managerial decisions. 58 Permissible Land Uses (X Array). Residential: o Land with direct access or indirect access to navigable waters that requires periodic dredging of boat channel and a spoiling area for dredged materials, on an individual ownership basis. o Development where community marina serves in place of individual waterfront lots, as advertised. o Development where both individual and community boating accom- modations are available, as advertised. Commercial o The quay, dockside, or pier wholesaling and/or retailing of fin-fish, shrimp and shellfish unprocessed to the public. o The waterside retailing of fishing equipment and bait. o Use of the waterfront, including marina and boating services that enhances hotel and/or motel attractiveness. o Eating establishments specializing in seafoods that use a waterfront location as a setting to draw customers. o The retailing of boats (power and sail) and the necessary equip- ment and service that is required for maintenance and operation. 59 Processing a d Manufacturing: o Construction of naval vessels; vessels for the merchant marine with maintenance and/or repair services as needed. o Construction of craft for the commercial fishing fleet, offshore workboats and craft for both charter and pleasure. o Metal fabrications that are portions of outer continential shelf drilling and production platforms, usually transported by barge to site of installation. o, The refining of petroleum into distillates with crude oil being received by pipeline and by tanker. o The manufacture of paper from wood pulp with cordwood being received, by barge shipment. o The processing of finfish, shrimp and shellfish into seafoods for both human and animal consumption. o The manufacture of agricultural chemicals, and involves ship- 'Ment by bulk cargo carrier. o Production of poles, piling and timbers and their shipment to domestic and foreign markets. Mining and Energy: o The extraction of oil and gas and their transportation to shore from offshore drilling and production platforms. 6o o Extraction of chemicals from sea water with pipeline intake and transport. o the mining of sand, gravel and shells requiring dredging and barge transport. o The production of electrical energy in which coal is moved by barge to plant site for generation purposes. Transportation: o Internal roads that provide immediate access to waterfront land uses and that cross bottoms of the wetlands. o Highways that provide a way for movement of goods and people that connect with major local, regional and national markets, and that cross the state wetlands in particular locations. 0 Spur railroad lines that provide immediate and direct service to ports and harbor industrial areas, including dockside services. o Main connector railroads.that transport cargoes and commodities and@cross the state wetlands. o Pipelines that carry oil and gas and rest on the bottom of the coastal wetlands. o Airport that services the national defense establishment and requires shoreline stabilization to protect runway- 61 o Cargo services for international and coastal carriers such as freighters, tankers and barges involves the provision of moorings and berthing space; the.loading, unloading and storage of cargoes; ship fueling, waste transfer and chandler services. Also common carriers are needed for the transport of cargoes to and from the port facility. o Berthing services are needed for fishing vessels, charter craft and pleasure craft during the off seasons. Such services are usua lly pro vided by marinas and small craft harbors where fueling, waste transfer and minor maintenance facilities are available. Recreation: o State parks which provide the pleasures of boating and require access to navigable waters. o Small craft launching and retrieval facilities developed for, public use and enjoyment. 0 Public beaches providing many recreational areas.and activities 'which do periodically need replenishment of sand. o. Offshore islands of the Gulf Islands National Seashore where natural scenes are preserved along with sites of historic interest, which need protection from beach erosion. o. Fishing piers and jetties for.public'use and enjoyment and that occupy submerged lands of the wetlands. 62 o Private fishing camps for individual and family pleasure with boating facilities and access to navigable waters. Institutional: o Local entities such as schools, institutions of higher learning, and fraternal bodies that have waterfront.facilities. o State supported activity in the form of the Gulf Coast Research Laboratory with its small craft harbor and access channel and the Point Cadet facilities. o Federal installations are represented by the Keesler Air Force Training Base which abuts.the wetlands and the NASA National Space Technology Laboratories. The laboratories have a complete internal water transport system with channels, locks, docks and wharves. However, the entire system is directly dependent upon the East Pearl River barge channel. Factors Relating to Coastal Activities (Y Array Significance: 0 '@'Local," activities effecting, primarily, the social-economic deve.lopment and environment of the Mississippi coastal com- munity. 0 "Regional," activities-whose beneficial impact extends beyond thecoastal com munity and which may be interstate as well as intrastate. 63 0 "Nati onal," activities where interests of the entire nation are being served. Many activities will have a degree of national importance, however, those such as the Department of Defense and the NASA National Space Technology Laboratories are repre- sentative of a greater national interest. An activity may be placed in one, two or all three categories, thus indicating its comparative level of significance. Water Oriented Facilities and Services Classification: Land use classifications are stated in simplified manner in.the Y array these being: residential, commercial, industrial (pro- cessing, manufacturing, mining and energy), and institutional. When considered appropriate, availability of facilities and/or services may be indicated by use of the terms: private, semi- public,and public. Land.Support Facilities and Services Major types of facilities are: marinas, small craft harbors,, port.s, planned harbor and industrial area, planned industrial seaway,, planned industrial complex and the independent facility. All fac ilities, in varying degree, occupy some part of what was once the coastal wetland, have caused alteration of the shore- line and, with exception of the independ ent facility, are de- pendent upon properly maintained navigation channels. All have a direct and significant impact upon the state wetlands and the coastal waters. 64 Typ of Access to Natural Navigable Water There are three types of navigation channels: o The ship channel which is the widest has operating depths varying from 30 feet at Gulfport to 40 feet at Pascagoula. o Barge channels are next in width with minimum operational depths ranging from 7 to 12 feet. o The smaller boat channels have depths from 4 to 7 feet. All channels require periodic dredging and are confronted with spoil disposal problems. Waterfront Development Development has been separated into three basic areas of refer- ence for,convenience in evaluation, these being shoreline pro- tection or stabilization, genera,l features associated with marine facilities.and services and special features related to water orien ted activities. o Shoreline protection and stabilization can be accomplished in a number of ways and may or may not be directly related to marine facilities and services, aIcase in point being measures taken to protect-the Mississippi shoreline from the ravages of trop ical storms and hurricane tides. Such protection can take the form of bulkheads, rip-rap, seawall, sand berm or breakwater or various combination s of these forms. Usually a portion of the wetlands is lost i-n the installation process. 65 o General features presented are found in association with facilities and services rendered water oriented.activities. Boat slips and finger piers are usually for small craft, while the massive east'and west piers of the Port of Gulfport serve ocean-going vessels. All are necessary if the needs of pleasure craft, fishing vessels and the larger cargo vessels are to be satisfied. Such features include: boat slips, piers, wharves, quays, docks, open storage areas, protected storage areas in the form of transient sheds and warehouses, cargo handling facilities, vessel moorings and berthing, barge moorings and berthing, freight shipment, fueling and waste transfer, ships' chandler, building sites, and parking areas. Again, these features will occupy in part, areas that once were wetlands of the coastal zone. o Special features of the coastal waterfront include sling hoist launching and retrieval of small craft, launching ways for small craft construction yards', and for larger naval and cargo vessels, petroleum storage facilities for tanker dis- charge, elevator storage for grains to be shipped by bulk cargo carriers, dry docks for vessel maintenance and repair, pipeline service, dredge service and workboat.support service. Practically all special feature facilities and services need a maintained channel of appropriate depth and have removed a portion of once productive wetlands. Also there is a problem of spoil disposal. 66 Impact: From description of the foregoing permissible land uses and the necessary support facilities and services it becomes evident that a direct and significant physical impact has been made. This has been accompanied by an undetermined loss of marine biota and chemical disturbance. The irretrievable loss of state wetlands has been compensated, in part, by development of major activities that have helped to diversify and strengthen the economic structure of the coastal area, the State and the interstate region. National interests have been served. However, such land use activities, by the nature of their impact, are considered subject to the coastal zone management program. WATER USE As in the case of land use, an investigation was made of the type and nature of water uses that existed in the Mississippi coastal zone, as defined within the body of this r@qport. The X" array of this matrix is entitled Permissible Water Uses representing the social-economic activities encountered. The "Y" array of the matrix is en- titled.Factors indicating needed physical facilities and support services. Permissible Water Uses (X array) Commercial: o Fishery acti vities in the catching or netting of finfish and shrimp and the tonging and/or dredging of shellfish. 67 o Mariculture in the form of leased wetlands,(bottoms) that can be used for the propagation and harvesting of oysters and other forms of marine life. o Charter craft that,use the coastal waters for commercial fishing purposes. Mining,and Extraction: o The extraction of gas and oil and the transportation from offshore locations to shore processing points. 0 Sea,chemicals derived from the waters or mined from the bottoms requiring barge or pipeline transport. o Sand, gravel and shell mini.ng by dredging and needing barge move- ment to shore. Transportati on: Navigation: o The movement of freighters, tankers, and barges under tow to destined ports, harbors and other areas requiring a main- tained navigation channel, either coastal or international. Navigation Aids: o The use 6f channel buoys and data buoys to assist in the 68 navigation of coastal waters promotes operational safety of the waterway system. Recreation: o Charter craft that provide sportfishing and find the waters of coastal Mississippi suited to the needs of,their operations. Pleasure cruising by charter craft for the enjoyment of the area's natural and restf ul beauty. o Sportfishing, sailing and motor boating are recreational activi- ties that individual owners of small craft can enjoy and like charter craft require knowledge of coastal water depths and channels for navigation and safety of operation. Factors Relating to Water Activities (Y array) Significance: 0 "Local," activities effecting, primarily the social-economic development and environment of the Mississippi coastal com-. munity. 0 "Regional," activities whose beneficial impact extends beyond the coastal community and which may be interstate as well as intrastate. 0 "National,11 activities where interests of the entire nation are being served (See permissible land use). 69 Water Oriented Facilities and Services: Classification Though no residential use of offshore coastal waters was en- countered, facilities and services are needed in support of commercial, industrial and institutional activities. When considered appropriate, availability of facilities and/or services may be indicated by use of the terms: private, semi- public and public. Water Dependent Facilities and Services Major offshore facilities are oil and gas drilling and produc- tion platforms, petroleum transfer terminals, piers and docks. Pipelines connect offshore platforms with shore facilities, and cross the submerged lands beneath the coastal waters, oc- cupying a portion of the state.wetlands. Workboats provide fuel,'material and supply transfer and utilize channels where shallow waters are encountered. Types.of Navigation Channels Though.boat channels are needed.in certain areas offshore, for most craft natural depths are sufficient for their operation. Barge transport uses the well maintained intracoastal waterway which traverses the Mississippi Sound in an east-west direction. Ocean-going vessels enter the coastal waters at the port of Gulfport or Pascagoula ship channels. 70 There are three types of navigation channels: o The ship channel which.is the widest has operating depths varying from 30 feet at Gulfport to 40 feet at Pascagoula. o Barge channels are next in width with minimum operational depths ranging from 7 to 12 feet. 0 The,smaller boat channels have depths from 4 to 7 feet. All channels require periodic maintenance dredging, in addition to occasional enlargement, and have spoil disposal pr oblems. Coastal Water Mon itoring Service There exists a need for a greater intensity of activity to pre- Vent t he discharge of waste in the coastal waters, and to con- trol fuel and oil spills that occur from marine activities. Small dead cull fish have fouled beach es during operations of the fishing fleet, possibly the result of working too near the shore. Natural preditors normally prevent such an occurrence. Patrol vessels are needed to keep fishing operations the proper distance offshore. Impact: 'Movement of ships, barge tows and small craft on the coastal waters of MissisOppi requires the presence and maintenance of navigation channels, resulting in a direct physical change of the natural con- figuration of the submerge wetlands. Growth of spoil areas may in 71 time change the flow of, coastal water currents, as well as cover pro- ductive areas of the wetlands. However, larger vessels and ships could not enter the coastalwater without the presence of suitable channels, and the loss of such traffic would cause serious economic repercussions. Marine activities in the coastal waters exert.a direct and significant physical impact through their need for navigation channels. Also, there is present the potential for contamination from spills and poor fishing practices that result in both chemical and biological impacts. The dredging of channels and placement of spoil is considered a coastal management concern as is the protection of coastal water quality, and the movement of maritime commerce through the waters of the Mississippi coastal zone. 72 PERMISSIBLE USES The following tables list the categories-of land and water uses which are considered to be permissible. Table 10 shows 47 permissible land uses, divided into discernible categories.' Table 11 shows 24 permissible water uses, similarly divided. 73 TABLE 10 PERMISSIBLE LAND USES Residential Boat Mooring and Berthing Single-Family Dwellings Subdivision Development Planned..Unit Development Other Commercial Dockside Activities . Unprocessed Wholesaling Finfish Shrimp Shellfish Retailing Finfish Shrimp Shellfish Bait and Tackle Shop Resort Motels and Hotels Seafood Eating Establishments Marine Sales, Supplies and Services Other Processing and Manufacturing Shipbuilding and Repair Naval Vessels Cargo Carriers Small.Craft Construction OCS Platform Sub-Assemblies Petroleum Refining Paper and Allied Products Seafood and Related Products Chemicals-and Related Products Timber and Tree Product Production Other Mining and Energy, Oil and Gas Wells Sea Chemical Extraction Sand, Gravel and Shell Mining Power Plants Other 74 TABLE 10 (continued) Transportation Roads Highways Railroad Spur Railroad Main Connector Pipeline Airport Other Cargo Services Coastal Vessels International Vessels Tugs and Barges Other Berthing Services Fishing Fleet Charter Craft Private Craft Other Recreation State Parks Boat Ramps Public Beaches Offshore Islands Public Fishing Area Private Fishing Camps Other Institutional Local State Federal 75 TABLE 11 PERMISSIBLE WATER USES Commercial Institutional Fisheries Local Finfishing State Shrimping Federal Shellfishing Mariculture Charter'.Craft Other Mining and Extraction Oil and Gas Wells Sea Chemical Extraction Sand, Gravel and Shell Other Transportation Navigation International Freighter Tanker Other Coastal Freighter Tanker Barge Other Research Vessels Search and Rescue Vessels Naval Vessels Construction Vessels Other Navigation Aides Data Buoys Channel Buoys Other Recreation Charter Craft Sportfishing Cruising Other Private Craft Sportfishing Motor Boating Sailing Other 76 METHODOLOGY FOR DETERMINING RESOURCE USES TO BE PERMITTED AND MANAGED IN THE MISSISSIPPI COASTAL ZONE UNDER THE COASTAL ZONE PROGRAM GENERAL INTRODUCTION The resource base of Mississippi's coastal zone is limited by a number of geographic, cultural, ecological and seasonal factors. Some of these factors have been identified while others remain to be identified as well as quanti- fied through baseline studies. Where significant impacts and conflicts exist or can be predicted, knowledgeable and appropriate tradeoffs are required among coastal us es, and also between coastal and non-coastal uses. In decisions concerned with making tradeoffs or permitting coastal resource uses, the general common denominator is demand-supply-price, i.e. what is wanted (demand), what is available and appropriate (supply), and what must be done to bring them together (price). These terms do not apply strictly to dollars. For example, demand includes ecological balance and aesthetic satis- faction as well as recreation, navigation, land development and the like. Price includes dollars; it also includes such things as air, water and biological quality foregone, locational adva ntages foregone, and human energy consumed in resource allocation. To assist in making well-consid,ered decisions regarding uses expected to have significant impacts and conflicts in the coastal zone, a methodology for evaluation must be employed by decision makers. The broad purpose of.the methodology is to assist in identifying and prior- itizing conflicts and potential impacts in the coastal zone of Mi ssissippi. Additionally@ the methodology will assist in maintaining and improving the usefulness of the coastal zone of Mississippi and the Nation for now and the 77 future. Also, the methodology will be valuable in expediting a pertinent systematic mechanism for determing individual and cumulative resource uses and impacts to be permitted and managed in Mississippi's Coastal Zone. The Analysis Framework Chart is a component of the methodology and is the foundation upon which the methodology can be expanded for each category into a detailed evaluation as is appropriate for the proposed use. The Analysis Framework serves as a tool for systematically focusing and recording the judgements of informed experts and value issues as perceived by the public. The utility of the methodology-is that is will aid decision makers in the following important aspects concerning a proposed use of resources in the coastal @zone. 1. Identification of conflicts which may arise as a result of the use. 2. Identification of impacts that may occur as a result of the proposed use. (Impact is defined as the difference in the state or value of the environment with, versus without the use of resources). 3. Evaluation and prediction of whether the impact s associated with the use will be significant (see discussion* following item 4). If an impact is determined to be significant, this does not imply that@the proposed use is acceptable. The decision of acceptability will be rendered in the next step. 4. Through a process of weighing, determination of the acceptability of a si gnificant impact and.thus determination of whether the use as proposed will be permitted as proposed by the applicant, will be permitted With specified modifications or will not be permitted in the coastal zone. The evaluation of a project is to be conducted in such a manner that the project is approved or rejected in a manner least 78 costly to the environment and socio-economics and so each accepted project is permitted and conducted in its most desirable form. For determining whether an impact is significant, the following definitions will provide the guidelines for an operational approach. Environmental Impact An environmental impact re presents a man-made change at the community andeecosystem level. At the time of the permit request and within the capacity of the state of the art, an environmental impact is significant if it results in a change that is measurable in a statistically sound sampling program and if it persists, or is expected to persist, more than several years at the population, community or ecosystem level. Changes in the biochemistry of individual orga nisms do not.fall within this definition. If these changes cause or are expected to cause ctable changes in. population-level parameters., e.g. brood success, then the impact would be defined as a significant environmental impact. Socio-economic Impact A so cio-economic impact represents man-made changes and is significant where there is a change in economic productivity that is measurable or would be measurable in a statistically sound data gathering program and/ar where thereare changes in sociological qualities which are perceived to be.undesirable by mankind at the community level within the coastal zone. 79 PROPOSED RESOURCE USE WITHIN THE COASTAL ZONE OF MISSISSIPPI-STANDARD INFORMATION REQUIREMENTS TO BE PROVIDED BY THE APPLICANT REGARDING THE PROPOSED USE AND PERMIT REQUEST As part of the evaluation processes, certain standard information is necessary for the review of the propose d activity. This material, supplied initially, will provide for the review of the basic proposed activities of the applicant, giving generally the information to determine if the proposed activity would require a permit under the coastal program or if.expanded data would be needed. Listed below are the standard informational requirements. 1. Name, address and telephone number of the applicant, and if applicable, the applicant's agent. 2. Date., 3. Name and address of adjacent property owners. 4. Description of the proposed activity, its purpose or intended use. 5. Description of the proposed project A. New or Maintenance Work B. Dredging (types) C. Construction D. Filling 6. Location of project A. City, Town or Landmark B. Waterway C. Section, Township, Range.and County 7. Purpose of project and cost A. Private B. Commercial C. Public D. Other 80 8. Length of time required for the project A. Starting Date B. Completion Date 9. Measures to prevent detrimental offsite impacts 10. List of other approvals needed 11. Plan and drawi'ng-requirements 12. Certification of the, appli cant 13. Fees MISSISSIPPI MARINE RESOURCES COUNCIL REVIEW Upon receiving from the applicant the standard information regarding the pro posed use within the coastal zone of Mississippi, the staff of the Mississippi M arine Resources Council will review the submitted information. Prior to making a final decision, the Council may require the applicant,to provide additional information not originally submitted as part of the Standard Information Requirements. EXPANDED INFORMATION REQUIREMENTS NEEDED FROM APPLICANT REGARDING THE PROPOSED USE AND PERMIT REQUEST Depending upon the character and magnitude of the proposed use and after review of the initial information submitted by the applicant, the Mississippi Marine Resources Council may request additional information about the proposed use. The request for additional information may include a detailed Environmental Impact Statement. Also, the fol,lowing information may be requested: 1. As a1lowed by the state of the art, a summary which groups environ mental im'acts according to probability and severity of consequences. p 81 2. A summary which identifies those who gain and lose from the proposed action and a formal proposal for compensation which is planned. 3. A statement by economists and social analysts which shows exactly how each important impact was treated and which impacts remain unquantified and unconsidered. 4. If additional information and changes are required in the final impact statement, an additional summary page(s) may be requested to show exactly the functional and operational changes made in the project or anticipated since the first permit request was submitted for review. MISSISSIPPI MARINE RESOURCES COUNCIL DECISION REGARDING PROPOSED USE After review of the standard and expanded information, the Council will render a decision which will be one of the following: 1. Use clearly defined as not requiring a permit from and management under the Mississippi Coastal Program. 2. Use clearly defined as requiring a permit from and management under the Mississippi Coastal Program. If the decision is as specified in number two (2), the next step is to evaluate the proposed use or portion of the proposed use as to specifics of the permit and management requirements under the Mississippi Coastal Program. USE OR PORTION OF USE NEEDING EVALUATION AS TO SPECIFICS OF THE PERMIT AND MANAGEMENT REQUIREMENTS UNDER THE MISSISSIPPI COASTAL PROGRAM As stated previously, the Analysis Framework serves as a tool for systematically focusing and recording judgements of informed experts and value issues as per- ceived by the public. 82 At this point in the analysis framework, the evaluation process is divided i nto two major categories: (1) Resource Inventory and Evaluation of Resource(s) to be utilized on the basis of the proposed use, and (2) Evaluation of Use (Proposed Use) in the Coastal Zone of Mississippi. Each of these major categories is expanded into sub-categories, and after evaluation, findings are presented for the sub-categories. The major categories and their associated sub-categories interrelate, thus the respective findings become an integral.part upon which the suitability or acceptability of the proposed use is allowed as proposed, allowed with specified modifications or not allowed at all in the Coastal Zone of Mississippi. For clarity in the evaluation procedure, the following. sub-categories are defined: 1. Coastal Zone (of Mississippi) = The coastal zone of the state includes all the land and water area in the three coast counties of Hancock, Harrison and Jackson. 2. Regional This includes the areas immediately adjacent to the Coastal Zone of Mississippi. This includes those counties within the State of Mississippi which are outside the coastal zone but are included in the Southern Mississippi Planning and Development District. Also included in the regional category are the counties/parishes of Alabama and Louisiana which are adjacent to the coastal zone and regional area of Mississippi. 3. State = The State of Mississippi other than the coastal zone and regional areas. 4. National = The territory of the United States with emphasis largely on the continental United States. 83 Participation of Organizations in the Evaluation Process Other than the Mississippi Marine Resources Council For a proposed use requiring a permit, information from organizations other than the Mississippi Marine Resources Council will be obtained and will be part of the evaluation process. This information will be reflected in the decision as to the acceptability (suitability) of the proposed use in the coastal zone of Mississippi. These other organizati ons will be notified of a permit request and upon their request will be provided the Standard Information and any Expanded Information submitted to the Mississippi Marine Resources Council for review and evaluation of the proposed use in the coastal zone. All respondents will be encouraged to submit their information/statements within the outline of the Framework Analysis Chart (see Appendix). This will help focus the responses within an organized framework so that comparative analysis can be more readily accomplished. When national.interest is related to a proposed use, Federal decision makers will be provided the- opportunity and encou raged to evaluate and submit information from a national interest viewpoint. Governmental entities within the coastal zone, regional areas and residual areas of the State of Mississippi will be provided the opportunity and encouraged to evaluate and submit information concerning.a proposed use requiring a permit. When applicable, citizen groups and non-government agencies (local, regional, state, national) will be encouraged and afforded the opportunity to participate in the evaluation process of a proposed use. To accomplish this, and additionally, for the Mississippi Marine Resources Council to obtain a consensus of value issues concer ning the proposed resource use, the following procedures will be 84 utilized. The citizen groups and non-government agencies will appoint respective representatives. The citizen group representatives and the non-government agency representatives will be the Mississippi Marine Resources Council's point of contact. These representatives will be encouraged to submit terse, concise information/statements which have been approved by the organi:ations and which defend (the pros) or rebuke (the cons) the proposed use. In the presentation of the information/statements, a distinction.between factual findings and sub- jective judgements should be made clear. DISCUSSION OF METHODOLOGY AND EVALUATION TECHNIQUES LEADING TO A DECISION AS TO THE ACCEPTABILITY OF A PROPOSED USE WITHIN THE COASTAL ZONE OF MISSISSIPPI INTRODUCTION Each proposed use within the coastal zone of Mississippi must ultimately be considered in terms of its specific impacts, lo cal and otherwise. Thus, there will be a need to determine those impact facotrs to be evaluated on the basis of the proposed use. The basic methodology will be to go through the Analysis Framework Chart and, with respect to. a proposed use, under each category and its associated sub- categories, decide significant topic areas which are to be evaluated and, if necessary, researched. The evaluation of applicable factors will provide the "Findings" at points in- dicated in the Framework Analysis Chart. These Findings will be reflected in the decision.as to the acceptability of the use as proposed by the applicant. 85 METHODOLOGY AND EVALUATION TECHNIQUES - BROAD SCOPE DISCUSSION As has,been previously noted and as can be seen from the Framework Analysis Chart, for the sub-categories under the major categories, there are "Findings" indicated on the Chart as F . At every point where a finding is indicated and where app.licable in relation to a proposed use, a scenario will be provided. These scenarioes which will include information as to whether impacts and conflicts associated with the use can be predicted to be significant. 'The individual Findings will contribute to and be reflected in eight major assess- ments. These are as follows. Inventory Assessment for the Coastal Zone Inventory Assessment for Regional Area Inventory Assessment for the State (other than Coastal or Regional) Inventory Ass,essment for the Nation Environmental/Aesthetic Impact Assessment Sociological Impact Assessment Economic Impact Assessment (Note the two previous categories may be treated as a single topic under so6io-economic assessment) Legal Assessment These assessments will identify significant impacts and conflicts assoc iated with the proposed use and will.reflect expert information from professionals and value issues from the general public. As such, these assessments will contribute to and will be reflected in determining the acceptability decision. Based on the accept- .ability of the use as proposed by the applicant, the Council will render a decision as to whether the use will or will not be permitted in the coastal.zone. The ,Council may decide that the use will be permitted but only if the applicant agrees 86 to specified modifications. As is shown in the Framework Analysis Chaft, an alternate location for the use can be considered. METHODOL'OGY AND EVALUATION TECHNIQUES DISCUSSION OF SPECIFICS Methodologies to assist in preparing impact and evaluation statements (assessments) from which decisions can be made regarding the acceptab ility of a proposed activity vary from those which are relatively simple to those which are very complex. The character,and magnitude of proposed uses subm itted to the Mississippi Marine, Resources Council can be expected to vary from relatively small projects to relatively large, complex projects. In either situation the staff of the Mississippi Marine Resources Council must have a methodology by which the infor- mation provided by the applicant can be readily processed and, where necessary, must provide important additional information not provided by the applicant. Furthermore, the Mississippi Marine Resources Council must be able to identify additional practical and important information that is needed and may request this information from the applicant. .In the case ofa large, proposed project that would have complex, multi-faceted environmental .socio-economic and legal considerations, the bulk of the information may be provided by the applicant. Much of this information may have been generated with many man-hours of effort and with complex, expensive hardware. This infor- mation as provided and additional information received as a result of reviews by government and other organizations, must be evaluated by the Mississippi Marine Resources staff. T his will require the*utilization of a methodology that is within the capability of the Mississippi Marine Resources Council. 87 In selecting a methodology applicable to evaluating and determining resource uses to be permitted in the coast al zone of Mississippi, one important criterium is that the time involved in implementing the methodology be within the practical time capability of the staff of the Mississippi Marine Resources Council. Also, the methodology must be within the physical capacity, e.g., hardware availability, of the agency. Consequently, the methodology must consist of an'approach that can be carried out on a simplified "paper-and-pencil" basis in a relatively short period. On this basis, the methodology will largely consist of, but not be entirely limited to, the following techniques: 1. Essentially narrative 2. Check list, and 3. Simple matrices. The check list technique is the simplest form of impact ide ntification procedure. The checklist format will be a list of environmental, socio-economic, legal inter- actions and interr elationships that are specific to and associated with the proposed resource use. The checkli.st will serve as a means of focusing attention on con- flicts and impacts to be considered and evaluated, especially those which may be classified as significant. A simple matrix might be visualized as a two-dimensional checklist and is.the first step toward defining interrelationships systematically. The matrix may be a "cause-effect" relati,on. When helpful, the applicable cells of the matrix will be scored on the basis of the ma@gnitude of the impact upon a specific sector of the environment and on the degree of importance of the particular action on the environmental factor. A scale from I (minimum) to 10 (maximum) is used to estimate both the magnitude and importance of the impact. 88 For all practical purposes the magnitude can be understood as the probability of certain ev ents to cause certain effects on a specific sector of the environment. Importance, on the other hand, refers to the actual degree of impact after the occurrence of that event has taken place. Each cell of the matrix is filled with two numbers reflecting the quantification of the criteria of the impact',, namely magnitude and.importance. The use of this ordered scaling procedure should at least provide,fo'r identification of the most significant impact effects (those with highest scaled values). In summary, the Framework Analysis Chart, the three previously stated techniques, and additionally, professional judgement and intuitive reasoning will initially be used as the best available methodology for forecasting and predicting significant impacts for a proposed use. Along the use of analogous situations with adequate documentation of assumptions and supplemental field and/or laboratory investigations will be utilized in predicting impact relative to a proposed use. METHODOLOGY AND EVALUATION TECHNIQUES GROUND WORK FOR AN IMPROVED METHODOLOGY The previous section, as indicated, applies to the evaluation process as it will be initiall.ly conducted. The Mississippi Marine Resources Council staff will work within the scope as described in this section. However, as allowed by available staff time and/or research fu nds, improved methodologies will 'be investi- gated and utilized. In the process of selecting a methodology for identification and prioritization of significant impacts and conflicts predicted for a proposed use in the coastal zone of Miss.i,ssippi, the following criteria will be employed. The criteria are listed in general order of importance. 89 CRITERIA FOR SELECTION OF A METHODOLOGY Comprehensiveness. The methodology-must embrace all significant alternatives, all significant criteria and all major points of view. Without this criterion, decisions are almost certain to be suboptimal. Workability. The methodology must be simple enough to be learned and carried out by a small staff on a small budget in a short time. Without,this criterion, the Mississippi Marine Resources Council's mission would not be accomplished. Portrayability. The methodology and the conclusions derived therefrom must le nd themselves to compact summarization and high visual appeal so as to instill perspective, understanding and confidence in the public and earn their informed and enthusiastic participation. Without this criterion, the public would not understand or accept the results. Expandability. The methodology must permit initial sweeping evaluation of broad alternatives and general criteria, and yet be readily expanded to provide a non-duplicative, increasingly detailed focus on key aspects. Thus, the same methodology:should permit either a compact overview.analysis or a detailed examination. Without this criterion, either (1) excessive effort would be expended initially pursuing aspects later found to be insignificant, or (2) an essentially new start and data foundation would have to be initiated midway in the stu@y, or (3) a rare, extreme ly prescient individual would have to head and run the evaluation from its outset. Explicitness of Criteria. The methodology must include an explicit portrayal of all relevant criteria, systematically Arrayed and weighted to reflect the relative importance of each. Without this criterion, the validity of the 90 final results would be open to serious challenge. Such results might appear to be based largely on the personal concerns and perspectives of the analyst or upon current public whim. Holism. The methodology must reflect an understanding of the environmental- socio-economic-legal system as a whole and the major interrelationships between the various criteria. Without this criterion, the interrelationship'between criteria could be ignored. Separation of Effects. The methodology must reflect the changes that would occur in moving from a "without the alternative" to a "with the alternative" future. Without this criterion, the alternatives could benefit or be penalized by now-versus-future changes it does not affect. Commensurability. The various criteria are conventionally measured in a wide variety of objective and impressionistic units (dollars, biomass, recreation days, good-bad, jobs, etc.). Since there units of judgement are so widely disparate ("apples and oranges"), so-called conclusions are apt to become an unsynthesized basket of fruit, greatly paralyzing perception and decision making. Therefore, it would be highly desirable to employ a means of translating these ratings into commensurate units as a tool to facilitate comparison. Without this tool, the necessary synthesis of a wide variety of pros and cons is extremely difficult. Other criteria to be considered will be ability to articulate (1) the timing, duration and a real spread of the impact, (2) uncertainty, (3) risk and (4) degrees of confidence in the evaluation. 91 NOAA COASTAL SERVICES CTR LIBR 3 6668 1411