[From the U.S. Government Printing Office, www.gpo.gov]
Coastal Zone -TROUT RUN Information center RECREATIONAL -ACCESS TO LAKE ERIE FEASIBILITY- AND DESIGN STUDY 1-all . . . . . . . . . . . . . . . . . . . . . . . . AS PART OF THE IMPLEMENTATION OF THE PENNSYLVANIA COASTAL ZONE MANAGEMENT PROGRAM NOVEMBER 1985 GV 191,42 P4 @aj T76 Funded and Coordinated 1985 irough Department of Environmental Rtsour- Resources Management, Bureau c.3 1S'R0esffoiucrece0sf Management, Division of Coast- PREPARED FOR: Zone Management and the Erie County D*- FAIRVIEW TOWNSHIP irtment of Planning. PREPARED BY: ZonE URBAN ENGINEERS, INC. TROUT RUN RECREATIONAL ACCESS TO LAKE ERIE FEASIBILITY AND DESIGN STUD/ Prepared For: FAIRVIEW TOWNSHIP Board of Supervisors Albert B. Chorney, Sr. Chairman John G. Klier Kenneth L. Traut Prepared By: URBAN ENGINEERS, INC. The preparation of this report was funded and coordinated through the Pennsylvania Department of Environmental Resources, office of Resources Management, Bureau of Resources Management, Division of Coastal Zone Management and the Erie County Department of Planning. NOVEMBER 1985 TABLE OF CONTENTS page I. INTRODUCTION .................................. 1 II. NEED ANALYSIS ............ o-o ................. 2 Background ............. o......... o .......... 2 Area Lake Access Sites .................. o ... 4 III. PROPOSED SITE .................. o............... 7 Area Description .......... o ................. 7 Site Description ................... o ........ 8 Soils ................ o.............. 0....... 8 Shoreline Condition ......................... 9 IV. SITE DEVELOPMENT ............................. o 11 Level of Service ............................ . 11 Proposed Facilities ......................... 11 Traffic Control .............. o ............ 11 Sanitation Facilities ..................... 12 Recreation Facilities . .................... 13 Shoreline Alterations ............... o ..... 14 Boat Facilities and Miscellaneous Support Services ........................ 15 V. DEVELOPMENT PLAN IMPLEMENTATION ............... 17- Development Criteria ........................ 17 Phase I ..................................... 18 Phase II ......... o .......................... 18 Phase III ................................... 19 Phase IV ........... o ........................ 19 Phase V ..................................... 20 Phased Development Summary .................. 21 Funding ................ o .................... 21 Maintenance and Operation ................... 23 Phase d Cost Estimate Summary ................ 24 Phase I Cost Estimates .......o...o .......... 25 Phase II Cost Estimates ..................... 26 Phase III Cost Estimates . ................... 27 Phase IV Cost Estimates ..................... 28 Phase V Cost Estimates ............... o...... 29 VI. ALTERNATE DEVELOPMENT PLAN .................... 30 Proposed Facilities .. ....................... 30 Development Phaseing ....... o.... o ........... 31 Maintenance and Operation ...... o... o ........ 32 Alternate Plan Phase I Cost Estimates ....... 33 Alternate Plan Phase II Cost Estimates ...... 34 Alternate Plan Phase III Cost Estimates 35 Alternate Plan Phase IV Cost Estimates ...... 36 VII. PROJECT IMPLEMENTATION ...... __ ..... 37 BIBLIOGRAPHY .................................. 38 List of Plates Plate 1 - Site Location Plan Plate 2 - Existing Land Use Plate 3 - Existing Facilities Plate 4 - Proposed Facilities Plate 5 - Development Phases Plate 6 - Proposed Facilities Alternate Plan Plate 7 - Development Phases Alternate Plan I. INTRODUCTION The Fairview Township Supervisors, in appreciation of the problems of Trout Run and desirous of providing additional recreational opportunities to the residents of the Township, entered into an agreement on February 6,'1985, with the County of Erie to conduct a feasibility and design study for the pro- vision of recreational access at the confluence of Trout Run and Lake Erie. The purpose of this study is the selection of a suitable site based on physica,l criteria including topography, soils and land use; formulation of a development plan based on constraints inherent in the site,as well as, user needs; and finally, presentation of an implementation plan incorporating all phases of the project from site acquisition through construction and maintenance of the facility. II. NEED- ANALYSIS Backgro nd 1968 marked the introduction of salmon stocking to the Pennsylvania waters of Lake Erie. In the short time since the Pennsylvania Fish Commission initiated the stocking program, the pursuit of the salmonids has steadily grown and became a major recreational attraction for the area. The annual fall spawning runs, in particular, draw ever increasing numbers of local and regional fishermen. Trout Run, in Fairview Township,(Plate 1) is one of many streams along the Lake Erie shoreline suffering from the rapid rise in popularity of salmon fishing and the dearth of planning and facilities necessary to manage the influx of large numbers of sportsmen. A report, entitled "Lake Erie Angler and Boater Use and Angler Harvest Survey" prepared in 1982 under the auspices of the Coastal Zone Management Program and the Pennsylvania Fish Commission, indicates Trout Run was the destination for 41,420 angler trips in the year starting June, 1981. Only Walnut Creek and the Erie Public Dock exceeded Trout Run in yearly angler usage. More significant, perhaps, is the fact that Trout Run had the highest single monthly angler trip rate on Lake Erie within Erie County with 27,140 in the month of October. On a peak day, 800 anglers used the mouth of Trout Run as their fishing hole. 2 c: -n 0 CD z m z Q 0000 (31 z m m mnd Z Gul QE@*WLL4-J&A cl) rl -n ;o > z 12 100 0 c -4 LO m AD 0 -4 m MCKEAN U) z > rn Trout Run is also the only significant Lake Erie ice fishing area outside of Presque Isle Bay. A Pennsylvania Department of.Transportation traffic study, conducted in February, 1984, produced a daily vehicle count of 1,450 for the northernmost section of Avonia Road. As only 137 homes are served by this stretch of Avonia Road, the num- bers indicate the drawing power of the lakeshore even in the dead of winter. The locality around the mouth of Trout Run is experiencing problems in the areas of traffic control, primarily due to the lack of parking facilities; trespassing, as most of the land is privately owned; litter management; and potentially, public health because sanitation facilities are not generally available. In addition to the necessity of providing services for the sportsmen, Fairview Township is in needof public recreation sites and the Lake access at Trout Run can provide the found- ation for a desirable multi-use recreational development. The dominating recreational facilities in Fairview Township are the golf courses with two of the three belonging to private clubs. The Colony Pool and Tennis Club is also, private. Pub- lically owned recreational facilities in' Fairview Township are limited to the Walnut Creek Access Area and Strucheon Park along Elk Creek. The Walnut Creek Access Area, owned and operated by the Pennsylvania Fish Commission, has been provided with a marina, 3 used for docking space on a transient basis; restrooms; boat launching ramps; and parking areas. Fishing, from the shore of Lake Erie and the banks of Walnut Creek, is the main recreational activity. Strucheon Park is used for picnic outings and has no major activity related development. The Fairview School District pro- vides the bulk of the public access recreation in the township at the 4 facilities it operates. Six privately owned camps or campgrounds round out the Fairview Township recreational site inventory. Area Lake Access Sites The majority of the recreational sites west of Presque Isle are private and generally camp oriented. The public facilities are popular and well-used. The westernmost Erie County public recreation facilities are Raccoon Creek-Park and Eagley Park both located in Spring- field Township. Both parks have picnic grounds and general recreational activities. In addition, Eagley Park has a small boat launch ramp. Elk Creek is one of the three streams most heavily impacted by the growth in popularity of salmon fishing. The area around the mouth of the creek currently houses a private boat ramp, camp ground and public restrooms. An extensive development plan is envisaged for Elk Creek including channel-improvements and docking facilities. 4 WESTERN ERIE COUNTY LAKE ACCESS RECREATION SITES Park Location Ownership Acreage Facilities Pebble Beach Campground Old Lake Road Private 2.39 Camping Sites Raccoon Creek Park Elmwood Rd. and Erie County 194.1 Beach, picnic tables, camping, Old Lake Rd. fishing, general purpose field. Eagley Park Eagley Road Springfield Township 10.34 General purpose field, picnic tables, small boat ramp. Camp Lambec Eagley Road Presbyterian Church 920 Cabins, dining hall, various recreation activity areas. Camp Judson Holliday Road Northwestern Baptist 115.07 Cabins, dining hall, recreation Associates areas. Camp Fitch Ables Road Youngstown, OH 233.44 Cabins, pool, horseback riding, YMCA volleyb(111. Elk Creek Access Mouth of Elk Girard Township 22 Fishing, boat ramp (private) Area Creek (leased) restrooms. Lake.Erie Community E. Park Dr. Girard Township ill Camping, picnic tables, kitchen. Park Camp Eriez Allegheny Rd.. Private Camp Sherwin West Lake Rd. YMCA - Erie Flower's Marina Avonia Road Private Marina, fishing. Camp Notre Dame Eaton Road Private Walnut Creek Access Manchester Rd. PA Fish Commission Marina, boat ramps, fishing. Area Manchester Beach Manchester Rd. Private Beach Powell,Beach Powell Ave. Private Boat Ramp Kelso Beach Kelso Dr. Private Beach 5 Lake Erie Comunity Park, near Elk Creek, i's picnic and camping oriented. Walnut Creek Access Area is geared to pro- viding primarily boat related services including launching and docking facilities. Fishing is also a major activity at Walnut Creek. of particular relevance to this study is the Flower Marina located on the west side of Trout Run. Privately owned and operated, this marina provides slips for approximately 60 small craft, as well as, fishing from its piers. 6 III. PROPOSED SITE Area Description Western Erie County public-lake access sites tend to be located at the mouths of various streams i.e., Raccoon Creek Park, Elk Creek Access Area, and Walnut Creek Access Area. The proposed development of Trout Run is no exception. This develop- ment pattern is due primarily to two circumstances: first, the streams are popular fishing spots and second, physical access to the lake is easier at the streams. Generally, the lakeshore topography consists of a small beach backed by a 30 foot or higher bluff. The streams have eroded a channel through the bluff and, as a consequence, have provided easier access to the lake. The accompanying Land Use Map shows the existing land use pattern for the area around the proposed site between Lake Erie and Route 5 along Avonia Road and Trout Run (Plate 2). The area is predominately residential with some commercial development adjacent to Pennsylvania Route 5 a primary east-west arterial roadway. As noted earlier, the land at the mouth of Trout Run is privately owned with the exception of the Avonia Road right- of-way. Evaluating the lots in the vicinity on the basis of suitability for the development of a multi-use recreational facility results in the selection of the land on the east side of the mouth of Trout Run currently owned by Leo J. Brugger, as the most desirable site for acquisition. 7 LAKE ERIE @-j z@x RESIDENTIAL EXISTING LAND USE AVONIA ROAD AREA PUBLIC/ INSTITUTIONAL NORT .5 H of RT FAIRVIEW TOWNSHIP RETAIL COMMERCIAL ERIE, PENNSYLVANIA PLATE 2 Site Description The Brugger property is a 3.1 acre site made up of three distinct land forms: bluff, a moderately sloping center section and the shoreline, (Plate 3 ). The bluff extends along the eastern and southern sides of the site with heights of from 10 to 50 feet and a steep 15-300 slope. The majority of the property slopes toward the lake at a moderate 5% grade. The beach varies from approximately 20 to 50 feet in width and is backed by a 8 foot high bank in the north- east corner. A small pond is located centrally in the tract with a large frame house, garage, boat shed and several storage buildings distributed throughout the eastern portion of the site. The lot is accessed from Avonia Road on the west and a driveway servicing the main building. Site vegetation consists of woods on the bluff slopes, part of the Avonia Road frontage and the area immediately north of the pond. The remainder of the parcel is covered with grass and scattered trees. soils The site is composed to two soil types: Ottawa loamy, fine sand and Wayland silt loam. The separation line runs approx- imately through the pond on a north-south axis. The Ottawa soil series consists of deep, well-drained, sandy soils whose parent material was made up of acid, lacustrine sands sorted and deposited by water. A gray, calcareous material, 8 generally called quicksand in the area, occurs at depths of 4 feet or more. The Ottawa soils occur on.the eastern portion of the site. The Wayland silt loam is a deep, somewhat poorly to poorly drained soil found on the flood plain of strearns. The soil is derived from silt and clay sediments washed down from the upland. Due to their location on the-flood plain, Wayland loams are sub- ject to frequent flooding and have a mottled appearance common in soils subjected to varying water levels. Based on information contained in "Erie Courity Pennsylvania Soil Interpretations", 1972, the two soils types present on the proposed site have the following estimated properties. Ottawa loamy, fine sand: maximum dry density of 105-116 pounds per cubic foot at an optimum moisture content of 13-16%; low shrink/swell potential and low to moderate corrosion potential. Areas of concern include erodibility of grassed waterways and caving of trench sides. The Wayland soil series represents a soil with more pro- blems associated with it, primarily due-to the high water table and flooding potential. The corrosion potential is high to moderate. In addition, the shrink/swell potential is moderate. To complete the profile, the Wayland silt has a maximum dry density of 105-115 pcf, with an optimum moisture content of 15-20%. Shoreline Condition Bluff erosion caused by lake action is generally most severe in areas with little or no beach,or at a bluff with little or no vegetation to retain the soil. The bluff east of 9 Trout Run is recessed well away from the lake except in the northeast corner. A sea wall protects the toe of the slope in this area. In addition, the bluff is protected by well vegetated slopes. The beach is 20 to 50 feet wide with the narrowest point coinciding with the seawall location. An 8-10 foot high mini- bluff backs the beach in the central and eastern portions of the shore. The narrower beach and a minimal vegetation cover makes this the most erosion susceptible location within the site. Trout Run currently turns east approximately parallel to the shoreline and in high flow conditions may contribute to shore- line erosion. The northwest corner of the site is designated, by the Fairview Township Flood Insurance Study, as Zone B - 500 year storm flooded area. Finally, the site is at the western terminus of a groin field approximately mile long. The groins average approxi- mately 100 feet long with stabilized beach depths of 60- 90 feet. 10 IV. SITE DEVELOPMENT Level of Service The development/experience level serving as the guide for the proposed Trout Run Access Area is secondary modern. This classification system, based on criteria developed by the Forest Service of the U.S. Department of Agriculture, encompasses user expectations and environmental modifications acceptable to these expectations. The secondary modern classification level includes, as experience norms: a change of routine or surroundings, apparent opportunities for socializing, and provisions for convenience and comfort. The environmental modifications acceptable to this class of user include the following: The site heavily modified but natural; some facilities designed strictly for convenience and comfort; roads and trials artificially surfaced; and some pro- gramming services provided. Proposed Facilities (Plate 4) Traffic Control The present access route, Avonia Road, is 20 feet wide with a 30 foot wide turnaround at the north end. The parking available is limited to on-street parking along Avonia Road. During the seasonal salmon runs, traffic assumes the role of a major irritant at best and a safety hazard at worst. To help alleviate this situation, the majority of the site will be utilized for parking and access. The existing pond, which has turned septic will be filled to provide additional 11 parking area. The entrance to the parking lot will be via a 16 foot wide, I-lane access road meeting Avonia Road near the location of the existing driveway. North of the entrance road, Avonia Road will be one-way south-bound throughout most of the year. With the traffic flow pattern envisioned, the parking lot will function as a large loop turnaround. During the off season, a cul-de-sac turnaround can be formed from a portion of the new parking lot and the north end of Avonia Road. This-will enable maintenance costs to be reduced during periods of minimal usage. 106 spaces are planned with 10 foot wide parking stalls being utilized in order to facilitate the loading and unloading of fishing tackle and picnic supplies. The elimination of on-street parking and control of the traffic flow should alleviate the most pressing problem at the site. Sanitation Facilities The lack of sanitation facilities is the next problem addressed. The need for restrooms is met by remodeling the existing house to contain restrooms and bathhouse facilities. The increas.e.in user load will make the existing sewage dis- posal system inadequate and Health Department approval for an expanded on-site system is questionable, therefore, alternates have to be considered. Two approaches are presented here. A lift station could be provided to pump the sewage to a leach field location at,-the top of the bluff suitable for sewage disposal. The leach field could be eliminated in the event municipal sewers are provided. This approach involves the lease or purchase of ground for the leach field and ease- ments for the pipe run. Although 'costly, the suggested method 12 is similar to that utilized by the Flower Marina located adjacent to the proposed access site. The second alternate is the provision of sewage holding tanks on-site. This approach has a lower construction cost but requires regular servicing by a contractor to remove the accumulated wastes. The cost estimate presented later in this report is based on the lift station approach. Recreation Facilities The presence of a large, well located building on the site serves to make other uses; which may not have been cost justifi- able if a building had to be constructed, feasible. Used in conjunction with the swimming beach, the building could serve as a beach concessions center providing food, lockers, chairs, umbrellas, balls and sundry paraphernalia. Alternately, a restaurant or bait/tackle shop could occupy all or part of the facility. The restaurant, in par- ticular, could utilize the large porches for very pleasant open air seating in fair weather. Finally, indoor recreation encompassing a wide range of active and passive activities including: arts and crafts, billiards and board games, as well as, activities considered more educationally oriented, such as: lectures, concerts, museums and nature centers could be housed in the remodeled structure. The main building on the property was once a gun club and has the large rooms and facilities needed by groups. A well-planned recreation program could include many, if not all, of the previously mentioned activities. 13 The areas south of the parking lot and east of the main building are designated as picnic areas. Immediately north of the house is the location of a tot-lot. The activity mix in the tot-lot include swings, see-saws and slide. The large garage in the south central section of the site will be re- modeled and used as a picnic pavilion. Shoreline Alterations On the west side of the site, Trout Run is to be channeled to a width of 50 feet between the jetty of the Flower Marina on the west and a new jetty on the east. A bulkhead runs eastward from the northern extremity of the new jetty. The bulkhead will provide fishermen with additional room in which to pursue their sport. The Pennsylvania Fish Commission has responded favorably to this development. In addition to protecting the shoreline from damage due to heavy stream flows, the jetty and fishing pier provide a sheltered area that will be filled with sand and used as addi- tional swimming beach. Some scouring of the filled beach can be expected. The eroded material is to be recaptured by a groin located in the northeast corner of the site thus further in- creasing the beach area. I The cost estimate for the construction of the filled be ach is based on the importation of the required material, however, material from the Flower Marina's on-going dredging ope rations, currently discharged offshore near the center of the proposed site, could be used for the fill along with the material removed 14 from the Trout Run channel as part of the necessary stream maintenance. The existing sluice pipe now used for the marina dredging operations would be covered by the proposed fill (beach) area. The existing dredge discharge location will require relocation out of the swimming area to perhaps east of the proposed groin. The dredged,material from the marina could be used to replenish eroded material. Boat Facilities and Miscellaneous Support Services Preliminary plans included a boat ramp and boat docking facility, located in the area of the proposed new beach. The investigation of the suitability of the site for a boat ramp and a boat docking facility found that this type of develop- ment is not feasible. The site is not sheltered and would re- quire extensive protective works, while the history of the marina adjacent to the site indicates substantial maintenance is required on a continuing basis. Consideration was also given to the effect of competition that a new public facility would have on the existing private enterprise. At the current time, Walnut Creek has boater related services as will the pro- posed development of the Elk Creek Access Area. Finally, the provision of boater services would exacerbate the traffic and parking problems already very much in evidence. While parking is to be provided, the large areas required for auto/boat trailer combinations would rapidly reduce the spaces that could be provided at the site, especially in light of the desirability of maintaining the multi-use recreational center.approach.. 15 Miscellaneous support services required include storm drainage, a lift station to transfer the sanitary waste to sewers or septic systems on top of the bluff, walkways and landscaping. 16 V. DEVELOPMENT PLAN IMPLEMENTATION Development Criteria The envisioned development will be expensive and real- istically, funding will not be available to pursue the entire project at one time. With this in mind, the project must be broken down into more manageable portions spread over a reason- able time period. The phased approach to plan implementation requires prioritizing the development objectives in order to provide the optimum utilization of the facility throughout the extended construction time frame. The main criteria used to rank the development priorities is how the activity or facility impacts the problems of access, sanitation and lastly recreation. Each phase has been assigned a 1-5 year time span with the estimated costs of the proposed improvement considered in the final assignment of the included activities. The phased development plan presented below (Plate 5) is only a guide to aid in the planning process. Time frames are suggested and could be shortened or extended based on the avail- ability of funds; while specific activities may be re-arranged to suit an altered priority evaluation based on changing popu- lation or use patterns. 17 Phase I Phase I includes the most crucial activity: site acqu.4- sition. In addition, the most pressing site problem,,traffic congestion, is addressed by the construction of a large portion of the parking lot along with a temporary entrance road and the exit road. Temporary restrooms are provided during this phase immediately north of the parking lot. The majority of the site remains unaffected by the Phase I development. With this in mind, the Township could utilize the interval between the purchase and the recreational develop- ment of the site by leasing the main building and the related- section of the property. Funds secured in this manner could be used to of f set the acquisition costs and provide the seed money for further development. The time frame proposed for Phase I is 1-3 years. Phase II The only activity in Phase II is construction of the proposed Trout Run channeling jetty. With Fish Commission approval, this structure will provide additional fishing area. The jetty also forms the necessary first step for later de- velopment. A sidewalk will provide handicap access to the ..jetty. Years 4 and 5 are set aside for the jetty construction. Prior to any construction affecting the Lake Erie shoreline, permits from the U.S. Army Corps of Engineers, the Pennsylvania. 18 LAKE ERIE IV FISHING PIER 7: EXISTING MARINA SWIMMING BEACH u 0 ..... ............... TEMPORARY RESTROOMSZ ........... TOT L 0 T:::::::::::::: . .. ...... ....... :::::::::P I C N I C::::::: ......... ... ...... AREA ................ RESTROOMS a BATHHOUSE ................ 0"& .0'- vwxx -KIK 41NO *.I%%-- PAVILION P I C N I U:::::: 0 AREA ......... .................. I...... V- C> TROUT-RUN ACCESS AREA 'DEVELOPMENT PHASES SW 177777-71 PHASE I PHASE IZ PHASEII PHASE 2: SCALE: 1" 80' PHASE M PLATE 5 Department of Environmental Resources and the Pennsylvania Kish Commission will be required. Permits from other regu- latory agencies may also be necessary. Phase III Year 6 marks the end of the lease period for the main Li building. Permanent restrooms and bathhouse facilities are to be located in this building after remodeling. Sewage disposal associated with this facility will be a costly item with a lift station providing a connection with a top of bluff leach field or municipal sewer system required. A financial agreement, lease etc., will be needed to obtain property in the event a leach'field is required. Easements may also be required dependent upon the sewer routing nec- essary to reach the disposal point. Phase III improvements also include the completion of the parking lot and access road, as well as the swimming beach. The site will also be available for picnic use although tables and other amenities will not be provided until Phase IV. Phase III is scheduled for years 6-8. Phase IV The fishing pier parallel to the shore at the end of the jetty is listed for this phase. The beach fill with expand-ed swimming opportunities is also included. Phase IV implementation takes place in years 9-11. 19 Phase V The final phase, years 12-13, encompasses the groin on the eastern end of the site, tot-lot and picnic facilities including the large garage remodeled to serve as a pavilion. The Township may be held liable for any erosion damage caused by the construction of the groin and should be prepared to replenish the eroded area as required. 20 Phased Development Summary Phase I Site Acquisition of parking lot, temporary restroom facilities and storm drainage. Phase II Jetty channeling Trout Run. Phase III Permanent restrooms, bathhouse, indoor rec- reation, sewage disposal system, remainder of parking lot and access road and swimming beach. Phase IV Fishing pier, filled beach with expanded swimming facilities. Phase V Groin, tot-lot, pavilion and picnic facilities. Funding At the present time, the Township can look to four funding sources for aid in financing the acquisition and development of the Trout Run Access Area-. First, the Department of Community Affairs provides grants on a 50/50 basis through the Recreational Improvement and Re- habilitation Act Program (RIRA). As the name of the program implies, recreation projects will be considered for funding. Monies provided by grants can be earmarked for property acquisition as well as development for areas designated for public recreational faci lities including fishing and swimming. Secondly, the National Park Service of the U.S. Department of the Interior provides funds for local government sponsored recreation and park projects through a program called the Federal Land and Water Conservation Fund.(LWCF). This pro- gram, administered by the Pennsylvania Department of Community Affairs, will also fund acquisition as well as development of pub- lic parks and recreational facilities. Related-professional fees 21 for the design, engineering and construction supervision are also eligible costs. LWCF reimbursement is limited to a maxi- mum of 50 percent of eligible costs or the approved grant amount, whichever is less. The third source of funding is the Coastal Zone Manage- ment (CZM) Program. This study, as previously noted in the introduction is being funded with CZM funds. The program is Federally funded through the U.S. Department of Commerce's National Oceanic and Atmospheric.Adminstration (NOAA). Pennsyl- vania funds are dispersed by the Department of Environmental Resources, Division of Coastal Zone Management. Previously, non-construction-type projects which involve planning, feasibility studies, site planning design, etc. have been the only eligible projects. Recently, however, construction and acquisition activities are now being considered. Projects involving recreational access facilities and shoreline pro- tection facilities are cited as eligible for funding. At present, up to 80% of approved project construction costs can be funded by the CZM 306A program. Finally, an access area with the emphasis on sport fishing related problems may be considered for funding by the Pennsyl- vania Fish Commission. All sources of funding will require matching funds from other agencies and/or Fairview Township. 22 Maintenance and Operation Acquisition and constructi on of a recreational facility are major one-time expenses; support services, however, require an annual expenditure. Support services for a rec- reational facility are made up of maintenance, operational services, programming and hea lth and safety services. Maintenance is the continuing process of providing a clean and usable facility. Grass cutting and related land- scaping, restroom cleaning and supply replenishment, apparatus repair, trash removal and snow clearing are all activities included under maintenance services. Operation covers the necessary record keeping activities, as well as, the pumps and power systems necessary for the functioning of the park. Programming is the phase of park operation responsible for special events, competitions, organization, scheduling and instruction. Finally, security forces, medical services and lifeguards, come under the heading of health and safety services. The services provided by the park generally run between and 3% of the development cost. Based on this "rule of thumb" the following annual costs are associated with providing support services for the proposed Trout Run Access Area. Phase 1 1,040 - 1,560 Phase II $ 2,730 - 4,100 Phase III $ 3,325 - 5,000 Phase IV $ 1,870 - 2,800 Phase V $ 3,985 - 5,980 $12,950 -19,440 23 The costs listed above are basically maintenance related items. Provision for program staff, lifeguards, etc., will be extra. The noted support staff is required initially in Phase.III upon the opening of the beach and the remodeling of the main building for indoor recreation. Based on a swimming season of 100 days and an 8 hour day, the cost of a lifeguard would be $6,000. Programming services for the same time period would run $12,000 - $15,000. The programming staff costs may be less if volunteers are avail- able. Phase IV requires 2 additional lifeguards at a cost of $12,000. The final annual maintenance cost is in the range of $42,964- $52,440. Phased Cost Estimate Summary Phase I $ 52,050.00 Phase 11 136,600.00 Phase 111 166,100.00 Phase IV 93,500.00 Phase V 199,270.00 Total Project $ 647,520.00* The cost estimates are based on concepts and.preliminary data with no provision for contingency. For planning purposes 15% to 20% may be added to the figures. The cost reflects 1985 prices for the estimated quantities. The more detailed cost breakdowns are contained in the following pages. *Figure does not include site acquisition or maintenance costs. 24 Phase I - Cost Estimates Site Acquisition Appraised Value Site Facilities Gravel Parking Area (55 spaces) $ 25,500.00 Temporary Restrooms (2) 11,200.00 Landscaping 1,500.00 Storm Drainage 5,800.00 Entrance Sign 500.00 Park Apparatus Litter Containers (4 each) 800.00 Total Site Improvements $ 44,500.00 Eng. 5,300.00 Legal 1,500.00 Audit 750.00 Total Phase I $ 52,050.00 Plus Site Acquisition Costs 25 Phase II - Cost Estimates Site Facilities Jetty $ 120,000.00 Sidewalk 600.00 Total Site Improvements $ 120,600.00 Eng. 14,500.00 Legal 750.00 Audit 750.00 Total Phase II $ 136,600.00 26 Phase III - Cost Estimates Site Facilities Main Building Remodeling $ 30,000.00 Sewage Disposal System 80,000.00 Parking Area (51 spaces) 27,600.00 Sidewalk 1,000.00 Landscaping 1,000.00 Park Apparatus Litter Containers (6 each) 1,200.00 Indoor Recreation Equipment 5,000.00 Guard Chair (1) 450.00 Total Site Improvements $ 146,250.00 Eng. 17,600.00 Legal 1,500.00 Audit 750.00 Total Phase III $ 166,100.00 27 Phase IV Cost Estimates Site Facilities Fishing Pier $ 59,600.00 Filled Beach 10,800.00 Landscaping 10,000.00 Park Apparatus Guard Chair (2) 900.00 Litter Containers (4) 800.00 Total Site Improvements $ 82,100.00 Eng. 9,900.00 Legal 750.00 Audit 750.00 Total Phase IV 93,500.00 28 Phase V - Cost Estimates Site Facilities Groin $ 12,000.00 Paved Parking Area 134,520.00 Pavilion (Remodeled Garage) 2,500.00 Water Outlets (Pavilion,Picnic sites) 8,500.00 (3) Landscaping 500.00 pjay_Lpparatus Swings (set of 4) 825.00 See-Saw (set of 4) 775.00 Slide 1,275.00 Bike Rack 275.00 Grills (6 each) 5,400.00 Litter Containers (10 each) 2,000.00 Picnic Tables (20 each) 8,000-00 Total Site Improvements 176,570.00 Eng. 21,200.00 Legal 750.00 Audit 750.00 Total Phase V $ 199,270.00 29 V. ALTERNATE DEVELOPMENT PLAN The foregoing discussion has been presented based on the assumption.-that the whole 3.1 acre parcel can be procured. . As this cannot be assured and the need for improvement still exists, an alternate plan is hereafter presented which requires the acquisition of only the western third of the Brugger property. Proposed Facilities The reduced site consists of the western third of the Brugger property from Avonia Road to the pond and from the existing driveway north to the lake (Plate 6). The basic activity and facility mix developed earlier in this report will remain although reduced in scale. The parking lot's circulation pattern is changed by placing the lot entrance just south of the existing 30 foot wide turn-around. The capacity of the lot is reduced to 58 vehicles. The most significant casualty in the alternate plan is the indoor recreation which was to be housed in the main building. In addition, the pavilion and tot-lot are lost to the smaller site. The loss of the main building dictates the construction of a building to house restrooms, bathhouses and a concession stand. The new building is sited just north of the parking lot.with the area surrounding the restroom facilities' to be util ized as a picnic ground. 30 ..... . ........... GROiW .......... ... . ....... ....... ... LAKE ERIE ........... R Y ms WIMMING BEACH @s iE y JjE7**r BATHf AU .... ...... ............. .......... .............. .............. ........... ..... .. ...... .... .............. ..... i L-EXISTING .... ........ 9A R I N A, .......... PROPOS SCALE:I"-100' ALTEF TROUTR The streams and shoreline improvements will remain with the groin on the eastern end of the Brugger property constructed in an easement developed for the purpose. The site size reduction also decreases the swimming beach to the zone provided by the filled beach enclosed by the fishing pier and Trout Run jetty. Finally, to assure privacy for the owner of the bulk of the original site, a six foot high chain link fence with appropriate screening foliage will be provided along the south and east sides of the new recreational facility. Development Phasing (Plate 7) Phase I consists of site acquisition, the parking lot,fence and screening and the temporary restroom facilities. The lower acquisition costs should enable the parking lot.to be paved early in the plan implementation rather than towards the.end. as envisioned in the primary development plan. The time frame for this phase is 1-3 years. Phase II remains unchanged with the jetty the only activity scheduled in years 4 an d 5. Phase III provides permanent restroom and bathhouse facilities. Spaces will provide for a concession stand although the provision of this service will be delayed until the filled beach is con- structed in the next phase. The picnic area is included at this time. The sewage disposal system is the most expensive item included in years 6-8. 31 LAKE ERIE IV FISHING PIER EXISTING Lu MAR I NA SWIMMING BEACH n PICNIC AREA z u @R'ES 0 MS ,BATHHOU V -TEMPORARY RESTROOMS HOUSE ARKING RE w 0 CL 0 cr CL ui -P, 0 W4 1@o 0 -p TROUT RUN ACCESS AREA ALTERNATE PLAN DEVELOPMENT PHASES 4 PHASE I PHASE M PHASEIr PHASE = SCALE: I"= 80' PLATETI Phase IVthe final phase, includes the fishing pier, filled beach and groin. The swimming facilities will be available w ith the construction of the beach and the concession stand can,lopen for business, Years 9-11 are covered by Phase IV. Maintenance and Operation The scaled down recreation area has a corresponding re- duction in operation and maintenance cost associated with it. The major cost savings occur in the area of programming staff. The smaller beach reduces the number of life guards while the elimination of indoor recreation eliminates the program staff required in that area. Fixed costs will be somewhat lower, reflecting the de- crease in development cost and size. The breakdown is as follows: Phase I $ 2,800 4,200 Phase 11 2,730 4,100 Phase 111 2,940 4,400 Phase IV 2,150 3,225 $10,620 -$15,925 Phase IV has the additional cost of $12,000 for a pair of life guards. 32 ALTERNATE PLAN PHASE I Cost Estimates Site Acquisition Appraised Value. Site Facilities Paved Parking Area (58 Spaces) 70,170.00 Temporary Restrooms (2) 11,200.00 Landscaping 3,000-00 Fence (320 L.F.) 4,800.00 Storm Drainage 5,800.00 Entrance Sign 500.00 Park Apparatus Litter Containers (4 each) 800.00 Total Site Improvements $ 96,270.00 Eng. 11,550.00 Legal 1,500.00 Audit 750.00 Total Phase 1 $110,070.00 Plus Site Acquisition Costs 33 ALTERNATE PLAN PHASE II - Cost Estimates Site Facilities Jetty $ 120,000.00 Sidewalk 600-00 Total Site Improvements $ 120,600.00 Eng. 14,500.00 Legal 750'.00 Audit 750.00 Total Phase Il 136,600-00 34 ALTERNATE PLAN PHASE III Cost Estimates Site Facilities Restroom/Bathhouse Building $ 45,000.00 Sewage Disposal System 80,000.00 Landscaping 1,000.00 Park Apparatus Litter Containers (4 each) 800.00 Picnic Tables (6 each) 2,400.00 Total Site Improvements $129,200.00 Eng. 15,500.00 Legal 1,500.00 Audit 750.00 Total Phase 111 $146,950.00 35 ALTERNATE PLAN PHASE IV Cost Estimates Site Facilities Fishing Pier $ 59,600. 00 Groin 12,000.00 Filled Beach 10,800.00 Landscaping 10,000.00 Park Apparatus Guard Chair (2) 900.00 Litter Containers (4 each) 800.00 Total Site Improvements $ 94,100.00 Eng. 11,300.00 Legal 1,000.00 Audit 750.00 Total Phase IV $107,150.00 36 VII. PROJECT IMPLEMENTATION Crucial to the success of this project is the acquisition of the private property east of Avonia Road. At the present time, the existing owner is not willing to relinquish the property in total or in part. Eminent Domain proceedings would thus be required to acquire the development land. it has been determined that Fairview Township does not have these poweres for recreational facilities. It may be nec- essary to seek assistance from other agencies (e.q. the Pennsylvania Fish Commission) who have these powers in order for the project to be accomplished. 37 Literature Cited Chaney, Charles A., "Marinas, Recommendations for Design, Construction and Maintenance", National Association of Engine and Boat Manufacturers, Inc., New York,1961. Christiansen, Monty I., "Park Planning Handbook", John Wiley & Sons, Inc., New York, 1977. Def. Quinn, Alonzo, "Design and Construction of Parks and Marine Structures", McGraw-Hill Book Company, New York, 1972. 'Great Lakes Research Institute, "Shoreline Erosion and Flooding, Erie County", Pennsylvania Department of Environ- mental Resources, Office of Resources Management, June, 1975. Northwest Engineering, Inc., "Eagley Park Site Development and Erosion Abatment Plan", Pennsylvania Department of Environ- mental Resources, Division of Coastal Zone Management, Sep- tember, 1982. U.S. Army Corps of Engineers, "Low Cost Shore Protection ... a Guide for Engineers and Contractors", 1981. U.S. Department of Aqriculture, Soil Conservation Service, "Erie County Pennsylvania Soil Interpretations", Washington, D.C., December, 1960. U.S. Department of Housing & Urban Development, Federal Insurance Administration,"Flood Insurance Study - Township of Fairview, Pennsylvania, Erie County", March 1978. Young, Leroy M. and Lahr, Robert A., "Lake Erie Angler and Boater Use and Angler Harvest Survey", Pennsylvania Department of Environmental Resources, Division of Coastal Zone Management and Pennsylvania Fish Commission, December 10, 1982. 38 I -r P, I I I I -1 -1 i I I I I 1. -1 I .I I 1111111 : , 3 6668 14102 1 -I-