[Senate Report 119-123]
[From the U.S. Government Publishing Office]


                                                       Calendar No. 421

119th Congress }                                              { Report
                                 SENATE                          
  2d Session   }                                              { 119-123
_______________________________________________________________________

                                     


         PROPER LEADERSHIP TO ALIGN NETWORKS FOR BROADBAND ACT

                               __________


                              R E P O R T

                                 of the

           COMMITTEE ON COMMERCE, SCIENCE, AND TRANSPORTATION

                                   on

                                 S. 323

                             together with

                             MINORITY VIEWS





                [GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT] 





                  June 1, 2026.--Ordered to be printed 
                                ______
                                
                  U.S. GOVERNMENT PUBLISHING OFFICE

69-010                    WASHINGTON : 2026                    
                  
                  
                  
                  
                  
                  
                  
                  
                  
                  
                  
                  
                  
                  
                  
                  
                  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
       SENATE COMMITTEE ON COMMERCE, SCIENCE, AND TRANSPORTATION
       
                    one hundred nineteenth congress
                    
                             second session

                       TED CRUZ, Texas, Chairman
JOHN THUNE, South Dakota             MARIA CANTWELL, Washington
ROGER F. WICKER, Mississippi         AMY KLOBUCHAR, Minnesota
DEB FISCHER, Nebraska                BRIAN SCHATZ, Hawaii
JERRY MORAN, Kansas                  EDWARD J. MARKEY, Massachusetts
DAN SULLIVAN, Alaska                 GARY C. PETERS, Michigan
MARSHA BLACKBURN, Tennessee          TAMMY BALDWIN, Wisconsin
TODD YOUNG, Indiana                  TAMMY DUCKWORTH, Illinois
TED BUDD, North Carolina             JACKY ROSEN, Nevada
ERIC SCHMITT, Missouri               BEN RAY LUJAN, New Mexico
JOHN CURTIS, Utah                    JOHN W. HICKENLOOPER, Colorado
BERNIE MORENO, Ohio                  JOHN FETTERMAN, Pennsylvania
TIM SHEEHY, Montana                  ANDY KIM, New Jersey
SHELLEY MOORE CAPITO, West Virginia  LISA BLUNT ROCHESTER, Delaware
CYNTHIA M. LUMMIS, Wyoming
                  Brad Grantz, Majority Staff Director
              Lila Harper Helms, Democratic Staff Director












































                                                       Calendar No. 421

119th Congress }                                              { Report
                                 SENATE                          
  2d Session   }                                              { 119-123

=======================================================================



 
         PROPER LEADERSHIP TO ALIGN NETWORKS FOR BROADBAND ACT

                            ----------------
                                
                  June 1, 2026.--Ordered to be printed

                            ----------------
                                
Mr. Cruz, from the Committee on Commerce, Science, and Transportation, 
                        submitted the following


                              R E P O R T

                         [To accompany S. 323]

      [Including cost estimate of the Congressional Budget Office]

    The Committee on Commerce, Science, and Transportation, to 
which was referred the bill (S. 323) to direct the Assistant 
Secretary of Commerce for Communications and Information to 
develop a National Strategy to Synchronize Federal Broadband 
Programs, and for other purposes, having considered the same, 
reports favorably thereon with amendments and recommends that 
the bill, as amended, do pass.

                          Purpose of the Bill

    The purpose of S. 323 is to direct the National 
Telecommunications and Information Administration (NTIA) to 
develop a national coordination and management strategy for 
federally supported broadband programs.

                          Background and Needs

    Congress has authorized a wide variety of programs for the 
deployment and adoption of broadband connectivity across the 
United States.\1\ Through the Universal Service Fund, the 
Federal Communications Commission (FCC) provides billions of 
dollars in annual subsidies via the Connect America Fund, 
Lifeline, Rural Health Care, and E-Rate programs to meet the 
increased access goals of the Telecommunications Act of 
1996.\2\ NTIA likewise subsidizes broadband through several 
programs, most notably the $42 billion Broadband Equity, 
Access, and Deployment (BEAD) program. The Department of the 
Treasury and the Department of Agriculture (USDA), through the 
Rural Utilities Service (RUS), also administer multi-billion-
dollar broadband programs.
---------------------------------------------------------------------------
    \1\Government Accountability Office, Broadband: National Strategy 
Needed to Coordinate Fragmented, Overlapping Federal Programs, GAO-23-
106818, May 10, 2023, https://www.gao.gov/products/gao-23-106818.
    \2\``Universal Service,'' Federal Communications Commission, 
https://www.fcc.gov/general/universal-service (last visited March 7, 
2025).
---------------------------------------------------------------------------
    As detailed in a 2023 Government Accountability Office 
(GAO) report, ``Federal broadband efforts are fragmented and 
overlapping, with more than 133 funding programs administered 
by 15 agencies.''\3\ Substantial overlap exists between the 
goals of these various programs, and because they are run by 
different Federal agencies, the programs are not always aligned 
or coordinated. For example, GAO identified a significant 
number of instances where the FCC's High Cost program and the 
USDA's RUS programs provided Federal funding to the same 
areas.\4\ Consequently, GAO noted that while the National 
Economic Council had worked to coordinate programs, agencies 
recommended the development of a coordinated national strategy 
to guide Federal broadband efforts because ``effective 
coordination can help . . . minimize the potential for wasteful 
duplicative support.''\5\
---------------------------------------------------------------------------
    \3\GAO report, supra note 1, at 0-1.
    \4\FCC and RUS officials told GAO that there may be circumstances 
in which they may not consider multiple awards providing support to the 
same area to be inherently duplicative. For example, some awards may 
fund capital expenditures, while other awards may fund ongoing 
operating expenses. Regardless, GAO notes ``effective coordination can 
. . . minimize the potential for wasteful duplicative support.'' See 
GAO report, supra note 1, at 4-5.
    \5\GAO report, supra note 1, at 5, 8, 9, 10.
---------------------------------------------------------------------------
    Federal broadband spending programs have also begun to 
embrace non-fiber technologies. BEAD recently opened up full 
participation in the program to low Earth orbit satellite (LEO) 
and fixed wireless providers given technology gains in 
reliability and price, allowing for a more cost-effective and 
expeditious deployment of high-speed internet to millions of 
Americans who might otherwise go unserved.\6\ LEO and fixed 
wireless providers can offer fast speeds and competitive 
subscriber pricing at more sustainable per-location costs in 
remote rural and Tribal areas than fiber builds\7\ while 
avoiding potential permitting delays that can bedevil some 
fiber projects.\8\
---------------------------------------------------------------------------
    \6\Jake Morabito and DJ Hatch, ``Broadband Update: A `Benefit of 
the Bargain' for the BEAD Program,'' American Legislative Exchange 
Council, February 10, 2026, https://alec.org/article/broadband-update-
a-benefit-of-the-bargain-for-the-bead-program/.
    \7\Patience Haggin, ``A Fight Between Cable and Wireless Providers 
Means Cheaper Home Internet for You,'' WSJ, June 24, 2025, https://
www.wsj.com/business/telecom/a-fight-between-cable-and-wireless-
providers-means-cheaper-home-internet-for-you-b36cc086; Michael Kan, 
``Starlink Drops Price As Low As $29/Month to Win Over New Users,'' PC 
Mag, May 5, 2026, https://www.pcmag.com/news/starlink-drops-price-as-
low-as-29month-to-win-over-new-users; ``United States Speedtest 
Connectivity Report,'' H2 2025, Ookla https://www.ookla.com/research/
reports/united-states-speedtest-connectivity-report-h2-2025; Sue Marek, 
``Starlink Hits New Highs in the U.S.,'' Ookla, May 5, 2026, https://
www.ookla.com/articles/starlink-hits-new-us-highs.
    \8\Fiber Broadband Association, Local Permitting for Fiber Network 
Projects: The Good, The Bad, and the Ugly, September 2025, https://
fiberbroadband.org/wp-content/uploads/2025/08/FBA-Whitepaper_Local-
Permitting-for-Fiber-Network-Projects_FINAL-1.pdf.
---------------------------------------------------------------------------
    This legislation would direct the NTIA to develop and 
implement a national strategy concerning the coordination and 
management of federally supported broadband internet service 
programs. It would also direct GAO to study the efficacy of the 
strategy, require the heads of covered agencies to report on 
their efforts to populate the FCC's Deployment Locations Map, 
require the tracking and improvement of processing times for 
Federal permitting applications for communications facility 
installations, and improve the Federal permitting process for 
certain broadband infrastructure projects subject to the 
National Environmental Policy Act.\9\
---------------------------------------------------------------------------
    \9\Public Law 91-190.
---------------------------------------------------------------------------

                         Summary of Provisions

    S. 323 would do the following:

   Direct NTIA to develop and implement a national 
        strategy to improve the coordination and management of 
        federally supported programs for expanding access to 
        and adoption of broadband internet service.
   Direct GAO to commence a study examining the 
        efficacy of the strategy and make recommendations on 
        how to improve it.
   Require the head of each covered agency to report on 
        their efforts to populate the Deployment Locations Map 
        in coordination with NTIA and FCC.
   Add requirements for the tracking and improvement of 
        processing times for applications for Federal 
        easements, rights-of-way, and leases for communications 
        facility installations.
   Make certain broadband projects eligible for 
        streamlined Federal permitting processes.

                          Legislative History

    S. 323 was introduced on January 29, 2025, by Senator 
Wicker (for himself and Senators Lujan and Welch) and was 
referred to the Committee on Commerce, Science, and 
Transportation of the Senate. On March 12, 2025, the Committee 
met in open Executive Session and, by voice vote, ordered S. 
323 reported favorably with amendments.

118th Congress

    S. 2238, the PLAN for Broadband Act, was introduced on July 
11, 2023, by Senator Wicker (for himself and Senators Lujan, 
Thune, and Welch) and was referred to the Committee on 
Commerce, Science, and Transportation of the Senate. Senators 
Padilla, Lankford, and Tuberville were additional cosponsors. 
On July 31, 2024, the Committee met in open Executive Session 
and, by voice vote, ordered S. 2238 to be reported favorably 
with an amendment (in the nature of a substitute).
    H.R. 4505, an identical House bill to S. 2238, was 
introduced on July 10, 2023, by Representative Walberg (for 
himself and Representative Kuster) and was referred to the 
Committee on Energy and Commerce of the House of 
Representatives.

117th Congress

    S. 4767, the PLAN for Broadband Act, was introduced on 
August 4, 2022, by Senator Wicker (for himself and Senator 
Lujan) and was referred to the Committee on Commerce, Science, 
and Transportation of the Senate.
    H.R. 8679, an identical House bill to S. 4767, was 
introduced on August 5, 2022, by Representative Walberg (for 
himself and Representative Welch) and was referred to the 
Committee on Energy and Commerce of the House of 
Representatives. Representatives Wittman and Gottheimer were 
additional cosponsors.

                            Estimated Costs

    In accordance with paragraph 11(a) of rule XXVI of the 
Standing Rules of the Senate and section 403 of the 
Congressional Budget Act of 1974, the Committee provides the 
following cost estimate, prepared by the Congressional Budget 
Office:

[GRAPHIC(S) NOT AVAILABLE IN TIFF FORMAT] 


    The bill would:
           Require the National Telecommunications and 
        Information Administration (NTIA) to develop a plan to 
        improve coordination among federal agencies to expand 
        broadband access
           Direct federal agencies to track and report 
        on application-processing times for permits to build or 
        maintain communications facilities on federal land
           Expand the types of projects eligible for 
        coverage under title 41 of the Fixing America's Surface 
        Transportation Act, which streamlines federal 
        permitting and environmental review for large energy 
        and infrastructure projects
           Increase the cost of an existing private-
        sector mandate if the Federal Communications Commission 
        increases annual fees to offset the cost of 
        implementing the bill
    Estimated budgetary effects would mainly stem from:
           Increases in spending subject to 
        appropriation for the NTIA to develop the plan
           Increases in direct spending for expedited 
        federal spending on broadband projects
    Bill summary: S. 323 would require the National 
Telecommunications and Information Administration (NTIA) to 
develop a plan for improving coordination among federal 
agencies to expand access to broadband Internet and to submit 
that plan to the Congress. The bill also would direct several 
federal agencies to report to the NTIA and the Congress on 
efforts to track broadband construction and to assist the 
Federal Communications Commission (FCC) with filling in its map 
that depicts national access to broadband. In addition, the 
bill would require the Government Accountability Office (GAO) 
to study and report on the plan's effectiveness.
    Under the bill, agencies specified in the bill would be 
required to track processing times for permit applications to 
install, construct, modify, or maintain communications 
facilities on federal land. (Under current law, such 
applications must be processed within 270 days.) The bill would 
require those agencies to analyze any delays, expedite 
processing, and report annually to the Congress.
    Finally, S. 323 would amend title 41 of the Fixing 
America's Surface Transportation (FAST) Act to expand the types 
of projects that are eligible for coverage under the FAST-41 
program, which was established in 2015 to streamline federal 
permitting and environmental review for large energy and 
infrastructure projects. The bill would lower the cost 
threshold at which covered broadband construction projects that 
are subject to review under the National Environmental Policy 
Act (NEPA) qualify for the FAST-41 program from $200 million to 
$5 million.
    Estimated Federal cost: The estimated budgetary effect of 
S. 323 is shown in Table 1. The costs of the legislation 
primarily fall within budget function 370 (commerce and housing 
credit).

                 TABLE 1.--ESTIMATED INCREASES IN SPENDING SUBJECT TO APPROPRIATION UNDER S. 323
----------------------------------------------------------------------------------------------------------------
                                                                   By fiscal year, millions of dollars--
                                                         -------------------------------------------------------
                                                            2026     2027     2028     2029     2030   2029-2030
----------------------------------------------------------------------------------------------------------------
Estimated Authorization.................................        3        2        1        *        *         6
Estimated Outlays.......................................        3        2        1        *        *         6
----------------------------------------------------------------------------------------------------------------
* = between zero and $500,000.
CBO estimates that enacting S. 323 would increase direct spending by less than $500,000 over the 2026-2035
  period.

    Basis of estimate: CBO assumes that S. 323 will be enacted 
by the end of 2025.
    Spending subject to appropriation: Using information from 
the NTIA, CBO estimates that implementing S. 323 would cost $6 
million over the 2026-2030 period. Any related spending would 
be subject to the availability of appropriated funds.
    CBO estimates that the costs for employee compensation and 
contracting to develop a plan to improve coordination among 
federal broadband programs would total $5 million over the 
2026-2030 period. Among other responsibilities, the NTIA would 
be directed to coordinate the work of federal agencies to 
establish a strategy, identify potential funding caps for 
certain broadband subsidies, and create benchmarks for the 
performance of federal broadband programs.
    Using information about the cost of similar reports, CBO 
estimates that the cost for GAO to complete its study, for 15 
federal agencies to report to the NTIA within 60 days of 
enactment, and for federal agencies to report on delays in 
processing permits for communications facilities would total $1 
million over the 2026-2030 period.
    CBO estimates that it would cost the FCC less than $500,000 
over the 2026-2030 period to consult with and report to the 
NTIA and to the Congress about broadband projects. However, 
because the FCC is authorized to collect fees each year that 
are sufficient to offset the appropriated costs of its 
regulatory activities, CBO estimates that the net cost to the 
agency would be negligible, assuming appropriation actions 
consistent with that authority.
    Direct spending: S. 323 would authorize certain broadband 
construction projects to participate in the FAST-41 permitting 
program, which is administered by the Federal Permitting 
Improvement Steering Council. To participate in FAST-41 under 
current law, a project must require an investment of more than 
$200 million and be subject to NEPA review. S. 323 would reduce 
that cost threshold to $5 million for broadband projects. CBO 
expects that under the bill many broadband construction 
projects that will be funded through the NTIA's Broadband 
Equity, Access, and Deployment (BEAD) Program would be newly 
eligible for FAST-41 coverage. The Infrastructure Investment 
and Jobs Act provided $42 billion in 2021 for the BEAD Program, 
which is designed to increase high-speed Internet access across 
the United States by funding planning, mapping, and deployment 
of broadband networks. CBO expects that funds for some BEAD 
projects that would participate in the FAST-41 program could be 
spent more quickly under S. 323 than under current law. Thus, 
net direct spending would increase over the 2026-2035 period 
for those projects.
    CBO expects that the increase in direct spending under the 
bill would be insignificant for three reasons. First, 
participation is voluntary, so many projects may not choose to 
participate in FAST-41 even if they are newly eligible under 
the bill. Second, because most broadband projects are 
categorically excluded from NEPA's documentation requirements, 
CBO expects that very few broadband projects would benefit from 
FAST-41 participation. Only projects that require an 
environmental impact statement (EIS) or environmental 
assessment under NEPA would be eligible for FAST-41.
    Third, CBO is uncertain about the extent to which any BEAD 
projects that newly participate in FAST-41 under the bill would 
spend funds more quickly than under current law. The Permitting 
Council's fiscal year 2024 report to the Congress shows that 
FAST-41 projects completed their environmental impact 
statements 23 percent faster than all projects requiring an EIS 
in that year.\1\ However, the NTIA is also streamlining 
requirements for permitting and environmental review, which 
reduces the effect of FAST-41 on the permitting process. 
Certain large, complex projects could benefit by using FAST-41, 
but those projects would still need to adhere to federal, 
state, and local permitting and environmental requirements, 
which all serve to delay project timelines regardless of FAST-
41 participation.
---------------------------------------------------------------------------
    \1\Permitting Council, Permitting Council FY 2024 Annual Report to 
Congress (April 2025), https://tinyurl.com/y54sc22w.
---------------------------------------------------------------------------
    Pay-As-You-Go considerations: The Statutory Pay-As-You-Go 
Act of 2010 establishes budget-reporting and enforcement 
procedures for legislation affecting direct spending or 
revenues. CBO estimates that enacting the bill would increase 
direct spending by less than $500,000 over the 2026-2035 
period.
    Increase in long-term net direct spending and deficits: CBO 
estimates that enacting S. 323 would not increase net direct 
spending or on-budget deficits in any of the four consecutive 
10-year periods beginning in 2036.
    Mandates: If the FCC increases annual fees to offset the 
costs of implementing provisions in the bill, S. 323 would 
increase the cost of an existing private-sector mandate as 
defined in the Unfunded Mandates Reform Act (UMRA) on private-
sector entities required to pay those fees. CBO estimates that 
the incremental cost of the mandate would be small and would 
fall well below the annual threshold established for private-
sector mandates ($206 million in 2025, adjusted annually for 
inflation).
    S. 323 contains no intergovernmental mandates as defined in 
UMRA.
    Estimate prepared by: Federal costs: David Hughes; 
Mandates: Rachel Austin.
    Estimate reviewed by: Justin Humphrey, Chief, Finance, 
Housing, and Education Cost Estimates Unit; Kathleen 
FitzGerald, Chief, Public and Private Mandates Unit; H. Samuel 
Papenfuss, Deputy Director of Budget Analysis.
    Estimate approved by: Phillip L. Swagel, Director, 
Congressional Budget Office.

                      Regulatory Impact Statement

    In accordance with paragraph 11(b) of rule XXVI of the 
Standing Rules of the Senate, the Committee provides the 
following evaluation of the regulatory impact of the 
legislation, as reported:

                       number of persons covered

    S. 323, as reported, will direct the NTIA to improve the 
coordination and efficiency of Federal broadband funding across 
Federal agencies via the development and submission to Congress 
of a national strategy and an implementation plan. Neither the 
national strategy nor the implementation plan would require the 
NTIA to collect information from individuals or businesses.

                            economic impact

    S. 323 is not expected to have an adverse impact on the 
Nation's economy. The legislation would aim to increase 
efficiencies and coordination across the Nation's 133 different 
Federal broadband funding programs. The legislation would also 
make broadband projects of $5 million or more eligible for 
streamlined National Environmental Policy Act (NEPA) review 
under the FAST Act.\10\
---------------------------------------------------------------------------
    \10\Public Law 114-94.
---------------------------------------------------------------------------

                                privacy

    S. 323 would not impact the personal privacy of 
individuals.

                               paperwork

    The Committee does not anticipate a major increase in 
paperwork burdens for private individuals or businesses 
resulting from the passage of S. 323. Neither the national 
strategy nor the subsequent implementation plan would require 
NTIA to collect information from individuals or businesses. The 
legislation would require NTIA to collaborate with Federal 
agencies to consider measures that would improve coordination 
and data sharing, thereby increasing the overall efficiency of 
Federal broadband programs and reducing waste, fraud, and 
abuse.

                   Congressionally Directed Spending

    In compliance with paragraph 4(b) of rule XLIV of the 
Standing Rules of the Senate, the Committee provides that no 
provisions contained in the bill, as reported, meet the 
definition of congressionally directed spending items under the 
rule.

                      Section-by-Section Analysis


Section 1. Short title.

    This section would provide that the bill may be cited as 
the ``Proper Leadership to Align Networks for Broadband Act'' 
or the ``PLAN for Broadband Act''.

Section 2. Definitions.

    This section would define the key terms ``appropriate 
committees of Congress'', ``Assistant Secretary'', ``broadband 
internet access service'', ``covered agencies'', ``Deployment 
Locations Map'', ``Federal broadband program'', ``Federal land 
management agency'', ``Implementation Plan'', and ``Strategy''. 
This section would also identify relevant Federal entities 
responsible for the implementation of this legislation.

Section 3. National Strategy to Synchronize Federal Broadband Programs.

    Subsection (a) would direct the Assistant Secretary, in 
consultation with relevant Federal entities, to submit a 
strategy to Congress that would: (1) support improved 
management of Federal broadband programs to maximize access, 
efficiency, and fiscal responsibility; (2) synchronize 
interagency coordination for Federal broadband programs; (3) 
synchronize interagency coordination of policies for granting 
permits for broadband infrastructure across Federal buildings 
and Federal properties; and (4) reduce or eliminate unnecessary 
barriers, costs, and administrative burdens to participate in 
broadband programs.
    Subsection (b) would outline the specific requirements to 
be included in the national strategy, including:

   a list of all Federal, State, and local broadband 
        deployment, funding, access, adoption, and 
        affordability programs;
   a description of existing Federal broadband 
        coordination efforts;
   identified laws, regulations, and agency policies 
        hindering coordination across Federal broadband 
        programs;
   an outline of the roles and responsibilities of 
        Federal agencies and clear goals, objectives, and 
        performance measures for the management of all Federal 
        broadband programs and interagency coordination efforts 
        with respect to Federal broadband programs;
   the cost of the strategy, including the 
        implementation cost;
   factors that increase the costs and administrative 
        burdens of participating in Federal broadband programs, 
        including with respect to access to infrastructure 
        necessary for broadband service deployment;
   information on the effectiveness of broadband 
        programs as measured by the number of locations 
        receiving broadband access or other assistance under 
        each Federal broadband program;
   analysis of how agency policies and practice do or 
        do not establish technologically neutral broadband 
        programs;
   recommendations to State, local, and Tribal 
        governments to more efficiently administer and 
        distribute program funding, such as avoiding 
        duplication of existing infrastructure or funded 
        projects, utilizing mapping data, and promoting access 
        or rights of way across private or government-owned 
        property necessary for deploying broadband;
   recommended incentives, legislation, or 
        administrative actions to improve Federal coordination 
        and management of Federal broadband programs and 
        eliminate duplication of Federal and non-Federal 
        programming;
   a description of streamlining efforts across Federal 
        and non-Federal government entities regarding the 
        issuance of permits or rights of way to government-
        owned property;
   identified limitations of economic development 
        organizations' participation in Federal broadband 
        programs;
   a proposed maximum subsidy to provide broadband to a 
        single location while allowing for consideration of 
        high-cost and Tribal areas;
   issues with broadband access on Tribal lands; and
   identified measures to prevent waste, fraud, and 
        abuse of Federal broadband program funding, ensure 
        accountability for the use of such funding, and 
        implement effective reporting requirements to measure 
        the success of Federal broadband programs.

Section 4. Implementation Plan.

    Subsection (a) would direct the Assistant Secretary, in 
consultation with relevant Federal entities, to submit an 
implementation plan to Congress no later than 120 days after 
submitting the strategy.
    Subsection (b) would outline the minimum requirements for 
the Implementation Plan, including that it be required to:

   provide a plan for the implementation of the 
        strategy with respect to the roles, responsibilities, 
        goals, objectives, and performance measures for the 
        management of Federal broadband programs and 
        interagency coordination;
   provide a plan to streamline and create consistent 
        policies and practices across Federal broadband 
        programs;
   provide a plan for holding agencies accountable for 
        measures identified in the strategy;
   describe the roles and responsibility of covered 
        agencies and the mechanisms to coordinate 
        implementation;
   include a permitting coordination plan for broadband 
        infrastructure;
   create a plan for regular evaluation and public 
        reporting of Federal broadband programs against clear 
        objectives and performance measures, permitting 
        processes for infrastructure with respect to broadband 
        service, and progress in implementing the strategy;
   with respect to Federal funds or subsidies to 
        support deployment of broadband service, provide a plan 
        for the adoption of common data sets regarding awards 
        including by utilizing the Deployment Locations Map, 
        applications regarding those awards, and rules for 
        prohibiting awards by covered agencies in areas 
        identified as served by the Deployment Funding Map or 
        areas already subject to an award or enforceable 
        deployment obligation by a covered agency under a 
        Federal or non-Federal broadband program;
   include a plan to monitor, report, and reduce waste, 
        fraud, and abuse in Federal broadband programs, 
        including wasteful spending resulting from fragmented, 
        overlapping, and duplicative programs;
   require consistent financial reports from covered 
        agencies for Federal broadband programs, consistent 
        with the ACCESS BROADBAND Act\11\ and Federal broadband 
        mapping;
---------------------------------------------------------------------------
    \11\Public Law 116-260.
---------------------------------------------------------------------------
   provide a plan to increase awareness and 
        participation in Federal broadband programs; and
   describe the administrative and legislative actions 
        needed to fully implement the strategy.
    Subsection (c) would direct the Assistant Secretary to 
publish a draft of the implementation plan in the Federal 
Register for public comment for a period of no less than 60 
days.

Section 5. Briefings and implementation.

    Subsection (a) would require the Assistant Secretary, and 
the agencies involved in formulating the strategy, to brief 
Congress on the implementation of the strategy no later than 21 
days after submitting the Implementation Plan to Congress.
    Subsection (b) would require the Assistant Secretary to 
brief Congress on its progress in carrying out the 
Implementation Plan at least every 90 days after submitting 
such plan.

Section 6. Government Accountability Office study and report.

    This section would require the Government Accountability 
Office to commence a study examining the efficacy of the 
strategy and the Implementation Plan developed by the Assistant 
Secretary and make recommendations on how to improve them no 
later than 1 year after the Assistant Secretary submits the 
Implementation Plan to Congress. The study would examine any 
existing or new performance goals and measures for Federal 
broadband programs, as well as examine any awards made by 
covered agencies under Federal, State, local, or Tribal 
programs with respect to broadband internet access service in 
areas identified as served or that are duplicative of other 
awards under such a program.

Section 7. Broadband Funding Map reporting.

    Subsection (a) would require the head of each covered 
agency to submit to the Assistant Secretary and the appropriate 
committees of Congress a report containing updates on the 
measures each respective agency has taken regarding 
coordination with NTIA and FCC to populate the Deployment 
Locations Map since May 15, 2023, within 60 days of enactment.
    Subsection (b) would require the reports to Congress to 
include information about the data populated in the Deployment 
Locations Map, if that data was populated in a complete and 
timely manner, and to identify outstanding challenges related 
to data submission.

Section 8. Tracking and improving processing times for communications 
        use applications.

    This section would amend the Middle Class Tax Relief and 
Job Creation Act of 2012\12\ to require executive agencies to 
develop controls to ensure that data is sufficiently accurate 
and complete to track the processing time of Federal permitting 
applications for communications facility installations 
described in that Act. Executive agencies would be required to 
analyze and report to Congress annually on the factors that 
contribute to delays in processing times. Further, executive 
agencies would be required to establish a method to alert staff 
if any application is at risk of failing to meet the 270-day 
deadline.
---------------------------------------------------------------------------
    \12\Public Law 112-96.
---------------------------------------------------------------------------

Section 9. Minimum broadband project cost.

    This section would amend the FAST Act\13\ to add broadband 
projects with a minimum investment cost of $5 million to be 
included on the priority list for the National Environmental 
Policy Act\14\ review.
---------------------------------------------------------------------------
    \13\Public Law 114-94.
    \14\Public Law 91-190.
---------------------------------------------------------------------------

Section 10. Rule of construction.

    This section would contain a rule of statutory construction 
that nothing in this Act could be construed to confer authority 
on the Federal Government, or any State, local, or Tribal 
government, to regulate broadband internet access service.
             Minority Views of Senators Cantwell and Lujan

    As introduced, S. 323 required that NTIA, as part of the 
Implementation Plan required by the bill, ``for Federal 
broadband programs that are not technologically neutral, 
determine a ceiling on the amount of a subsidy or funding award 
to provide broadband internet access service to a single 
location, to be consistently applied and adopted by all covered 
agencies for the funding of infrastructure with respect to 
broadband internet access service.''\15\
---------------------------------------------------------------------------
    \15\S. 323, PLAN for Broadband Act, 119th Congress, 1st Session, 
2025, https://www.congress.gov/bill/119th-congress/senate-bill/323.
---------------------------------------------------------------------------
    This language raised significant concerns for many members 
of the Committee, including Senators Cantwell and Lujan, 
because broadband deployment costs can vary dramatically based 
on geography, terrain, and technology. Indeed, Congress has 
recognized this by creating different broadband deployment 
programs administered by different agencies, including but not 
limited to the Tribal Broadband Connectivity Program, the 
Broadband Equity, Access, and Deployment Program, the Capital 
Projects Fund, the ReConnect Program, and the High Cost Program 
within the Universal Service Fund.\16\ Because these programs 
serve different geographies and have different goals, they do 
not have an overall national cap on funding per location.\17\
---------------------------------------------------------------------------
    \16\GAO report at 4-5.
    \17\Ibid.
---------------------------------------------------------------------------
    Moreover, the introduced language of the PLAN for Broadband 
Act in the 118th Congress (then S. 2238), cosponsored by 
Senator Lujan, did not contain language on the consideration of 
a national cap.\18\ The provision was later included in an 
amendment in the nature of a substitute. Ultimately, S. 2238 
was removed from the agenda of Executive Session 12 in 2024 due 
to unreconciled issues, including the language on a national 
cap.
---------------------------------------------------------------------------
    \18\S. 2238, PLAN for Broadband Act, 118th Congress, 2024, https://
www.congress.gov/bill/118th-congress/senate-bill/2238.
---------------------------------------------------------------------------
    During the Committee's consideration of S. 323, an 
amendment from Senator Cantwell was adopted. This amendment 
struck the requirement to include a national cap in the 
Implementation Plan and instead required in new subsection 
(3)(b)(13) that NTIA, as part of the national strategy it must 
submit to Congress, propose ``a maximum amount for a subsidy or 
funding award to provide broadband internet access to a single 
location, while allowing for the consideration of high cost 
areas, including high cost Tribal areas.''\19\
---------------------------------------------------------------------------
    \19\Cantwell--1 (modified), S. 323, PLAN for Broadband Act, 119th 
Congress, 1st Session, 2025, https://www.commerce.senate.gov/services/
files/77BC7C16-67C6-4F43-8488-9B9AB8D83BEC.
---------------------------------------------------------------------------
    However, even allowing for the consideration for high-cost 
and Tribal areas, a national cap on costs per location could 
disincentivize projects and potentially limit the quality of 
service to communities across the country, especially in rural 
and Tribal areas. If such a cap were instituted, it could leave 
rural and high-cost areas forced to choose less reliable 
alternatives to scalable, low-maintenance fiber optic 
networks.\20\ Additionally, it is unclear if a national cap 
would consider the cost of service. For example, while low 
Earth orbit (LEO) satellite broadband may appear to be more 
cost-effective compared to fiber-based deployments,\21\ LEO 
networks require that consumers purchase expensive customer 
premises equipment and require service plans that far exceed 
the national average.\22\ And the satellites themselves have a 
5-year lifetime, necessitating constant replacement.\23\ A 
national cap would make it increasingly difficult for rural 
America to use Federal funds invest in fiber networks, 
including where State and local officials have determined fiber 
as meeting their communities' connectivity needs. Choosing 
fiber broadband is a generational investment that can also 
support upgrades to wireless infrastructure, improving cell 
service while leaving potential for additional expansion.\24\ 
Ultimately, removal of any discussion of a national cap is 
needed to allow communities to determine for themselves the 
technology that best serves their needs.
---------------------------------------------------------------------------
    \20\Carol Mattey, ``Setting the Extremely High Cost Per Location 
for BEAD,'' Medium, December 31, 2023, https://medium.com/@CarolMattey/
setting-the-extremely-high-cost-per-location-threshold-for-bead-
07ebd3d9a912.
    \21\Ellis Scherer, ``State Satellite Programs Offer Lessons for 
U.S. Broadband Deployment,'' Information Technology & Innovation 
Foundation, February 10, 2025, https://itif.org/publications/2025/02/
10/state-satellite-programs-offer-lessons-for-u-s-broadband-
deployment/.
    \22\Jessica Dine, ``So You Want BEAD to Be Tech Neutral?,'' blog, 
New America, Open Technology Institute, March 21, 2025, https://
www.newamerica.org/oti/blog/so-you-want-bead-to-be-tech-neutral/.
    \23\``SpaceX's Approach to Space Sustainability and Safety: 
Operating Below 600 KM,'' SpaceX, February 22, 2022, https://
www.spacex.com/updates/#sustainability.
    \24\Deloitte Consulting LLP, Communications Infrastructure Upgrade: 
The Need for Deep Fiber, Deloitte Insights, July 2017, https://
www.deloitte.com/content/dam/assets-zone3/us/en/docs/industries/
technology-media-telecommunications/2024/us-tmt-5gready-the-need-for-
deep-fiber-pov.pdf.
---------------------------------------------------------------------------

                        Changes in Existing Law

    In compliance with paragraph 12 of rule XXVI of the 
Standing Rules of the Senate, changes in existing law made by 
the bill, as reported, are shown as follows (existing law 
proposed to be omitted is enclosed in black brackets, new 
material is printed in italic, existing law in which no change 
is proposed is shown in roman):

                                FAST ACT

           *       *       *       *       *       *       *

                       DIVISION D--MISCELLANEOUS

               TITLE XLI--FEDERAL PERMITTING IMPROVEMENT

                        [42 U.S.C. 4370m(6)(A)]

SEC. 41001. DEFINITIONS.

    In this title:
            (1) * * *
            (2) * * *
            (3) * * *
            (4) * * *
            (5) * * *
            (6) Covered project.--
                    (A) In general.--The term ``covered 
                project'' means any activity in the United 
                States that requires authorization or 
                environmental review by a Federal agency 
                involving construction of infrastructure for 
                renewable or conventional energy production, 
                electricity transmission, surface 
                transportation, aviation, ports and waterways, 
                water resource projects, broadband, pipelines, 
                manufacturing, semiconductors, artificial 
                intelligence and machine learning, high-
                performance computing and advanced computer 
                hardware and software, quantum information 
                science and technology, data storage and data 
                management, cybersecurity, carbon capture, 
                energy storage, or any other sector as 
                determined by a majority vote of the Council 
                that--
                            (i)(I) is subject to NEPA;
                            (II) is likely to require a total 
                        investment of more than $200,000,000; 
                        and
                            (III) does not qualify for 
                        abbreviated authorization or 
                        environmental review processes under 
                        any applicable law;
                            (ii) is covered by a programmatic 
                        plan or environmental review developed 
                        for the primary purpose of facilitating 
                        development of carbon dioxide 
                        pipelines;
                            (iii) is--
                                    (I) subject to NEPA;
                                    (II) sponsored by an Indian 
                                Tribe (as defined in section 4 
                                of the Indian Self-
                                Determination and Education 
                                Assistance Act (25 U.S.C. 
                                5304)), an Alaska Native 
                                Corporation, a Native Hawaiian 
                                organization (as defined in 
                                section 6207 of the Elementary 
                                and Secondary Education Act of 
                                1965 (20 U.S.C. 7517)), the 
                                Department of Hawaiian Home 
                                Lands, or the Office of 
                                Hawaiian Affairs; and
                                    (III) located on land owned 
                                or under the jurisdiction of 
                                the entity that sponsors the 
                                activity under subclause (II); 
                                [or]
                            (iv)(I) is subject to NEPA;
                            (II) involves the construction of 
                        infrastructure for broadband; and
                            (III) is likely to require a total 
                        investment of more than $5,000,000; or
                            [(iv)](v) is subject to NEPA and 
                        the size and complexity of which, in 
                        the opinion of the Council, make the 
                        project likely to benefit from enhanced 
                        oversight and coordination, including a 
                        project likely to require--
                                    (I) authorization from or 
                                environmental review involving 
                                more than 2 Federal agencies; 
                                or
                                    (II) the preparation of an 
                                environmental impact statement 
                                under NEPA.

           *       *       *       *       *       *       *

         MIDDLE CLASS TAX RELIEF AND JOB CREATION ACT OF 2012

           *       *       *       *       *       *       *

               [47 U.S.C. 1455(b)(3); Public Law 112-96]

SEC. 6409. WIRELESS FACILITIES DEPLOYMENT.

    (a) * * *
    (b) Federal Easements, Rights-of-way, and Leases.--
            (1) * * *
            (2) * * *
            (3) Timely consideration of applications.--
                    (A) In general.--Not later than 270 days 
                after the date on which an executive agency 
                receives a duly filed application for an 
                easement, right-of-way, or lease under this 
                subsection, the executive agency shall--
                            (i) grant or deny, on behalf of the 
                        Federal Government, the application; 
                        and
                            (ii) notify the applicant of the 
                        grant or denial.
                    (B) Explanation of denial.--If an executive 
                agency denies an application under subparagraph 
                (A), the executive agency shall notify the 
                applicant in writing, including a clear 
                statement of the reasons for the denial.
                    (C) Applicability of environmental laws.--
                Nothing in this paragraph shall be construed to 
                relieve an executive agency of the requirements 
                of division A of subtitle III of title 54, 
                United States Code, or the National 
                Environmental Policy Act of 1969 (42 U.S.C. 
                4321 et seq.).
                    (D) Point of contact.--Upon receiving an 
                application under subparagraph (A), an 
                executive agency shall designate one or more 
                appropriate individuals within the executive 
                agency to act as a point of contact with the 
                applicant.
                    (E) Tracking and improving processing 
                times.--
                            (i) Data controls.--An executive 
                        agency shall develop controls to ensure 
                        that data is sufficiently accurate and 
                        complete to track the processing time 
                        for each application described in 
                        subparagraph (A).
                            (ii) Requirement to analyze, 
                        address, and report on delay factors.--
                        With respect to the factors that 
                        contribute to delays in processing 
                        applications described in subparagraph 
                        (A), an executive agency shall--
                                    (I) analyze the factors as 
                                the delays are occurring;
                                    (II) take actions to 
                                address the factors; and
                                    (III) provide an annual 
                                report on the factors to--
                                            (aa) the Committee 
                                        on Commerce, Science, 
                                        and Transportation of 
                                        the Senate;
                                            (bb) the Committee 
                                        on Energy and Natural 
                                        Resources of the 
                                        Senate;
                                            (cc) the Committee 
                                        on Energy and Commerce 
                                        of the House of 
                                        Representatives;
                                            (dd) the Committee 
                                        on Natural Resources of 
                                        the House of 
                                        Representatives; and
                                            (ee) each committee 
                                        of Congress with 
                                        jurisdiction over the 
                                        executive agency.
                            (iii) Method for alerting staff to 
                        at-risk applications.--An executive 
                        agency shall establish a method to 
                        alert employees of the executive agency 
                        to any application described in 
                        subparagraph (A) with respect to which 
                        the executive agency is at risk of 
                        failing to meet the 270-day deadline 
                        under that subparagraph.

           *       *       *       *       *       *       *


                                  [all]