[Senate Report 112-196] [From the U.S. Government Publishing Office] Calendar No. 485 112th Congress Report SENATE 2d Session 112-196 ====================================================================== DEPARTMENT OF DEFENSE APPROPRIATIONS BILL, 2013 _______ August 2, 2012.--Ordered to be printed _______ Mr. Inouye, from the Committee on Appropriations, submitted the following REPORT [To accompany H.R. 5856] The Committee on Appropriations, to which was referred the bill (H.R. 5856) making appropriations for the Department of Defense for the fiscal year ending September 30, 2013, and for other purposes, reports the same to the Senate with an amendment, and recommends that the bill as amended do pass. New obligational authority Total of bill as reported to the Senate.................$596,644,000,000 Amount of 2012 appropriations........................... 622,862,127,000 Amount of 2013 budget estimate.......................... 596,799,298,000 Amount of House allowance............................... 597,708,873,000 Bill as recommended to Senate compared to-- 2012 appropriations................................. -26,218,127,000 2013 budget estimate................................ -155,298,000 Amount of House allowance........................... -1,064,873,000 CONTENTS ---------- Background: Page Purpose of the Bill.......................................... 5 Hearings..................................................... 5 Summary of the Bill.......................................... 5 Definition of Program, Project and Activity.................. 8 Committee Initiatives........................................ 9 Title I: Military Personnel: Military Personnel Overview.............................. 17 Military Personnel, Army................................. 18 Military Personnel, Navy................................. 22 Military Personnel, Marine Corps......................... 25 Military Personnel, Air Force............................ 28 Reserve Personnel, Army.................................. 31 Reserve Personnel, Navy.................................. 33 Reserve Personnel, Marine Corps.......................... 35 Reserve Personnel, Air Force............................. 37 National Guard Personnel, Army........................... 39 National Guard Personnel, Air Force...................... 41 Title II: Operation and Maintenance: Operation and Maintenance, Army.......................... 45 Operation and Maintenance, Navy.......................... 50 Operation and Maintenance, Marine Corps.................. 55 Operation and Maintenance, Air Force..................... 58 Operation and Maintenance, Defense-Wide.................. 62 Operation and Maintenance, Army Reserve.................. 67 Operation and Maintenance, Navy Reserve.................. 69 Operation and Maintenance, Marine Corps Reserve.......... 72 Operation and Maintenance, Air Force Reserve............. 74 Operation and Maintenance, Army National Guard........... 76 Operation and Maintenance, Air National Guard............ 79 U.S. Court of Appeals for the Armed Forces............... 81 Environmental Restoration, Army.......................... 81 Environmental Restoration, Navy.......................... 81 Environmental Restoration, Air Force..................... 81 Environmental Restoration, Defense-Wide.................. 81 Environmental Restoration, Formerly Used Defense Sites... 82 Overseas Humanitarian, Disaster, and Civic Aid........... 82 Cooperative Threat Reduction Account..................... 82 Department of Defense Acquisition Workforce Development Fund................................................... 82 Title III: Procurement: Aircraft Procurement, Army............................... 87 Missile Procurement, Army................................ 91 Procurement of Weapons and Tracked Combat Vehicles, Army. 94 Procurement of Ammunition, Army.......................... 97 Other Procurement, Army.................................. 100 Aircraft Procurement, Navy............................... 112 Weapons Procurement, Navy................................ 117 Procurement of Ammunition, Navy and Marine Corps......... 120 Shipbuilding and Conversion, Navy........................ 123 Other Procurement, Navy.................................. 127 Procurement, Marine Corps................................ 136 Aircraft Procurement, Air Force.......................... 140 Missile Procurement, Air Force........................... 146 Procurement of Ammunition, Air Force..................... 150 Other Procurement, Air Force............................. 152 Procurement, Defense-Wide................................ 156 Defense Production Act Purchases......................... 162 Title IV: Research, Development, Test and Evaluation: Research, Development, Test and Evaluation, Army......... 167 Research, Development, Test and Evaluation, Navy......... 180 Research, Development, Test and Evaluation, Air Force.... 192 Research, Development, Test and Evaluation, Defense-Wide. 209 Operational Test and Evaluation, Defense................. 220 Title V: Revolving and Management Funds: Defense Working Capital Funds............................ 223 National Defense Sealift Fund............................ 223 Title VI: Other Department of Defense Programs: Defense Health Program................................... 225 Chemical Agents and Munitions Destruction, Defense....... 232 Drug Interdiction and Counter-Drug Activities, Defense... 234 Joint Improvised Explosive Device Defeat Fund............ 234 Joint Urgent Operational Needs Fund...................... 234 Office of the Inspector General.......................... 234 Title VII: Related Agencies: Central Intelligence Agency Retirement and Disability System Fund................................................... 235 Intelligence Community Management Account................ 235 Title VIII: General Provisions................................... 236 Title IX: Overseas Deployments and Other Programs: Department of Defense--Military.............................. 243 Military Personnel: Military Personnel, Army................................. 244 Military Personnel, Navy................................. 245 Military Personnel, Marine Corps......................... 246 Military Personnel, Air Force............................ 247 Reserve Personnel, Army.................................. 248 Reserve Personnel, Navy.................................. 249 Reserve Personnel, Marine Corps.......................... 249 Reserve Personnel, Air Force............................. 250 National Guard Personnel, Army........................... 250 National Guard Personnel, Air Force...................... 251 Operation and Maintenance: Operation and Maintenance, Army.......................... 251 Operation and Maintenance, Navy.......................... 253 Operation and Maintenance, Marine Corps.................. 254 Operation and Maintenance, Air Force..................... 255 Operation and Maintenance, Defense-Wide.................. 256 Operation and Maintenance, Army Reserve.................. 257 Operation and Maintenance, Navy Reserve.................. 257 Operation and Maintenance, Marine Corps Reserve.......... 258 Operation and Maintenance, Air Force Reserve............. 258 Operation and Maintenance, Army National Guard........... 258 Operation and Maintenance, Air National Guard............ 259 Afghanistan Infrastucture Fund........................... 259 Afghanistan Security Forces Fund......................... 260 Procurement: Aircraft Procurement, Army............................... 261 Missile Procurement, Army................................ 262 Procurement of Weapons and Tracked Combat Vehicles, Army. 262 Procurement of Ammunition, Army.......................... 263 Other Procurement, Army.................................. 263 Aircraft Procurement, Navy............................... 264 Weapons Procurement, Navy................................ 264 Procurement of Ammunition, Navy and Marine Corps......... 266 Other Procurement, Navy.................................. 266 Procurement, Marine Corps................................ 267 Aircraft Procurement, Air Force.......................... 268 Missile Procurement, Air Force........................... 268 Procurement of Ammunition, Air Force..................... 268 Other Procurement, Air Force............................. 269 Procurement, Defense-Wide................................ 269 National Guard and Reserve Equipment..................... 270 Research, Development, Test and Evaluation: Research, Development, Test and Evaluation, Army......... 272 Research, Development, Test and Evaluation, Navy......... 272 Research, Development, Test and Evaluation, Air Force.... 273 Research, Development, Test and Evaluation, Defense-Wide. 273 Revolving and Management Funds: Defense Working Capital Funds 273 Other Department of Defense Programs: Defense Health Program................................... 274 Drug Interdiction and Counter-Drug Activities, Defense... 274 Joint Improvised Explosive Device Defeat Fund............ 275 Joint Urgent Operational Needs Fund...................... 276 Office of the Inspector General.......................... 276 General Provisions--This Title........................... 277 Compliance With Paragraph 7, Rule XVI of the Standing Rules of the Senate......................................................... 279 Compliance With Paragraph 7(c), Rule XXVI of the Standing Rules of the Senate.................................................. 280 Compliance With Paragraph 12, Rule XXVI of the Standing Rules of the Senate..................................................... 281 Budgetary Impact of Bill......................................... 282 Comparative Statement of Budget Authority........................ 283 BACKGROUND Purpose of the Bill This bill makes appropriations for the military functions of the Department of Defense for the period October 1, 2012, through September 30, 2013. Functional areas include the pay, allowances, and support of military personnel, operation and maintenance of the forces, procurement of equipment and systems, and research, development, test and evaluation. Appropriations for foreign military assistance, military construction, family housing, nuclear weapons programs, and civil defense are provided in other bills. Hearings The Appropriations Subcommittee on Defense began hearings on March 7, 2012, and concluded them on June 13, 2012, after nine separate sessions. The subcommittee heard testimony from representatives of the Department of Defense, other Federal agencies, representatives of organizations, and the public. In addition to these hearings, the subcommittee held four classified briefings with the regional Combatant Commanders and Commander of U.S. Special Operations Command. Summary of the Bill The Committee recommendation of $596,644,000,000 includes funding to develop, maintain, and equip the military forces of the United States in nonemergency appropriations. The fiscal year 2013 budget request for activities funded in the Department of Defense appropriations bill totals $596,799,298,000 in new budget authority, including $88,210,745,000 in contingency funding and $514,000,000 in mandatory spending. In fiscal year 2012, the Congress appropriated $622,862,127,000 for activities funded in this bill. This amount includes $507,896,492,000 in nonemergency appropriations and $114,965,635,000 in overseas contingency operations appropriations. The Committee recommendation in this bill is $26,218,127,000 below the amount provided in fiscal year 2012 and $155,298,000 below the amount requested for fiscal year 2013. The Committee recommends that $254,461,000 requested for Coast Guard activities be appropriated directly to the Department of Homeland Security. COMMITTEE RECOMMENDATIONS The following table displays the recommendations for each title: [In thousands of dollars] ---------------------------------------------------------------------------------------------------------------- Fiscal year 2012 Fiscal year 2013 Committee enacted estimate recommendation ---------------------------------------------------------------------------------------------------------------- Title I--Military personnel............................... 131,090,539 128,430,025 127,502,463 Title II--Operation and maintenance....................... 163,073,141 174,938,933 170,785,490 Title III--Procurement.................................... 104,579,701 97,194,677 97,635,496 Title IV--Research, development, test and evaluation...... 72,420,675 69,407,767 69,091,078 Title V--Revolving and management funds................... 2,675,529 2,124,320 2,214,024 Title VI--Other Department of Defense programs............ 35,593,020 35,430,579 35,013,758 Title VII--Related agencies............................... 1,061,591 1,054,252 1,056,346 Title VIII--General provisions (net)...................... -2,597,704 8,000 319,345 Title IX--Overseas Contingency Operations................. 114,965,635 88,210,745 93,026,000 ----------------------------------------------------- Net grand total..................................... 622,862,127 596,799,298 596,644,000 ===================================================== Total discretionary\1\.............................. 633,229,427 604,613,298 604,458,000 ---------------------------------------------------------------------------------------------------------------- \1\Includes scorekeeping adjustments for nonemergency and overseas contingency operations appropriations. DEFENSE BUDGET OVERVIEW Due to budget reductions mandated by the Budget Control Act, the Department of Defense was required to reduce its planned spending over the next decade. The Committee fully supports efforts to bring down the Nation's deficit but is concerned about the Department's approach to meet the targets set in the Budget Control Act. The Committee believes that instead of correcting years of poor fiscal discipline, the Department chose to make substantial reductions in force structure and take risk in meeting U.S. military commitments around the globe. Over the past several years, Congress has sustained the current force structure while finding tens of billions of dollars in annual savings by scrutinizing the budget request and removing funds from troubled programs, duplicative requests, and overstatement of certain funding requirements. The Committee believes that when the Department decided to combine the program and budget review during the Planning, Programming and Budgeting Execution [PPBE] process, the Under Secretary of Defense, Comptroller and the Comptroller staff's ability to exercise oversight of the budget was lost. This lack of oversight within the Department must be corrected. Not only is fiscal discipline lacking in the budget request, the Committee is concerned about the above threshold reprogrammings that the Department submits to Congress. The Committee understands fact of life changes will occur after the budget is approved by Congress and provides significant flexibility in general and special transfer authority to account for these unanticipated changes. However, the number of reprogrammings, dollar amounts, and significant increase of requests to start new programs outside the normal budget cycle that do not receive the same level of oversight, scrutiny and documentation, is disconcerting. The Committee strongly urges the Secretary of Defense to address these issues when building future budget requests to ensure the Department is utilizing funds efficiently and not requesting funds that cannot be spent in the year of execution, instead of proposing reductions to needed force structure. In the fiscal year 2013 defense budget, the Committee takes the same approach as prior years and makes funding adjustments to correct for lax budgeting. This funding is redirected to: (1) restore significant portions of force structure; (2) fund items that were identified as shortfalls or as combat losses by the Department after the budget was submitted; (3) fund increases authorized in S. 3254, National Defense Authorization Act for Fiscal Year 2013, as reported; and (4) fund various Committee initiatives that are addressed in further detail later in the report. Force Structure.--For the Department of the Army, the Committee recommends more than $700,000,000 for Army aviation to replace combat losses, procure additional helicopters that were reduced in the request, and upgrade existing helicopters. The Committee includes more than $200,000,000 for Abrams Tanks and the Improved Recovery Vehicle and nearly $200,000,000 to address field requirements for additional Patriot missiles. For the Department of the Navy, the Committee does not concur with the recommendation to prematurely retire nine Navy ships and provides over $2,300,000,000 to man, operate, equip, and modernize these ships. In addition, the Committee provides over $770,000,000 for advance procurement of a tenth Virginia- class submarine, $1,000,000,000 for an additional DDG-51 destroyer, and $263,255,000 for advance procurement of an amphibious warship. These funds were not included in the budget request, but the Committee believes these ships are crucial to supporting our Navy's global requirements, particularly as the U.S. military shifts its focus to the Pacific. These and other Navy shipbuilding adjustments are discussed in more detail later in the report. The Committee also provides $60,000,000 for advance procurement for 15 additional EA-18Gs to reverse the Navy's decision to end production of these aircraft. For the Department of the Air Force, in recognition of Title XVII of S. 3254, National Defense Authorization Act for Fiscal Year 2013, as reported, which pauses Air Force force structure movements for 1 year until a National Commission conducts a study of the current structure and makes recommendations to Congress on modifications to this force, the Committee provides over $800,000,000 to fund the 1-year moratorium. The Committee directs that none of the funds made available by this act will be used to make proposed force structure adjustments, unless the Committee has approved the Air Force proposal elsewhere in this act, until after the National Commission's recommendations are provided to the congressional defense committees. In addition, the Committee reverses the Air Force's request to terminate the Space Test Program and Operationally Responsive Space Program and includes $135,000,000 to continue these initiatives. Finally, the Committee includes a provision requiring the Department to complete the execution of funds previously authorized and appropriated for Global Hawk Block 30 and C-27J aircraft instead of sending these new, highly capable aircraft into storage as the Air Force proposed. For the Missile Defense Agency, the Committee recommends additional funds for programs that were reduced in the fiscal year 2013 budget request, including $163,000,000 for an additional AN-TPY 2 radar and $189,000,000 for additional SM-3 Block 1B interceptors. Shortfalls Identified After the Budget Submission.--The Committee provides substantial funds throughout the act to cover shortfalls identified by Department of Defense officials subsequent to the budget submission. Some examples include: $964,500,000 to mitigate projected fiscal year 2013 shortfalls for fuel and second destination transportation costs; $392,000,000 for the military personnel accounts; $293,000,000 for Operation and Maintenance, Navy for increased aircraft carrier, intelligence, surveillance and reconnaissance assets, and mine countermeasure ships presence in the U.S. Central Command Area of Responsibility; $150,000,000 to repair damage on the USS Miami; $211,000,000 for Israel's Iron Dome program; and $142,200,000 for High Definition Full Motion Video capability for U.S. Special Operations Command. In addition, the Committee provides $1,000,000,000 for National Guard and Reserve Equipment to help alleviate a $37,000,000,000 equipment shortfall identified by the Reserve Component. Increases Authorized in S. 3254, as Reported.--Aside from supporting the force structure adjustments included in S. 3254, National Defense Authorization Act for Fiscal Year 2013, as reported, the Committee also provides $273,000,000 to restore proposed TRICARE fee increases denied in S. 3254; $200,000,000 for the Rapid Innovation Program; $50,000,000 for additional intelligence, surveillance, and reconnaissance for Operation Observant Compass; $30,000,000 for the Industrial Base Innovation Fund; $59,100,000 for the Office of the Inspector General; additional amounts for a classified program; and funds for several other authorized increases. With all these adjustments, the Committee paid special attention to avoid levying bills on the Department of Defense in future years. In many instances, the Committee provides sufficient funds to pay down future requirements for modernizing and buying new platforms and equipment, replacing losses sustained in combat, or providing funds for shortfalls that the Department would have to reprogram during fiscal year 2013. The Committee believes that the adjustments made to the budget request will help improve financial management while ensuring that our men and women in uniform and their families are provided the best support and equipment the Nation can offer during these challenging economic times. CLASSIFIED PROGRAM ADJUSTMENTS The Committee recommends adjustments to certain classified programs, as explained in the classified annex to the Committee's report. Definition of Program, Project and Activity In fiscal year 2013, for purposes of the Balanced Budget and Emergency Deficit Control Act of 1985 (Public Law 99-177), as amended, the term ``program, project and activity'' for appropriations contained in this act shall be defined as the most specific level of budget items identified in the Department of Defense Appropriations Act, 2013 and the P-1 and R-1 budget justification documents as subsequently modified by congressional action. The following exception to the above definition shall apply: for the military personnel and operation and maintenance accounts the term ``program, project and activity'' is defined as the appropriations accounts contained in the Department of Defense Appropriations Act. In carrying out any Presidential sequestration, the Department of Defense and agencies shall conform to the definition for ``program, project and activity'' set forth above. Committee Initiatives The Committee has included funding above the President's budget request for several programmatic initiatives which the Committee believes are of inherent value for national defense. In several cases, funds are restored for programs which were included in previous Department of Defense budget requests, and several are for programs that the Committee believes are necessary to improve defense even though they have not been included under the request formulated by the Department of Defense. For instance, the Committee provides additional research funding in the following areas: alternative energy, space situational awareness, unexploded ordnance and landmine detection, nanotechnology, advanced metals and materials, military burn treatment, and traumatic brain injury and psychological health. The Committee believes additional research funding is warranted in these and other areas to ensure that the Department of Defense continues to pursue technological advances that are critical to our national defense. The Committee has also provided funding for programs that are chronically underfunded, such as test and training range upgrades and range conservation. The Committee directs that funding for these initiatives are to be competitively awarded or provided to programs that have received competitive awards in the past. Ship Modernization, Operations and Sustainment Fund.--The Department of Defense's 2012 defense strategy (``Sustaining U.S. Global Leadership: Priorities for 21st Century Defense'') calls for a ``rebalance toward the Asia-Pacific region''; however, the Navy's fiscal year 2013 budget submission includes a proposal to prematurely retire seven cruisers and two dock landing ships in the next 2 years. The Committee is concerned with this proposed elimination of force structure and believes it is disconnected from the defense strategy, creates future unaffordable shipbuilding requirements, and exacerbates force structure shortfalls that negatively impact the Department's ability to meet Combatant Commander requirements. The Committee is troubled by the impact that the proposed premature retirement of these ships will have on the Department's strategic realignment toward the Asia-Pacific region. Specifically, the Committee is concerned about the operational impact of this reduction in force structure on the balance of the Fleet as it attempts to meet requirements in the Asia-Pacific, as well as demands in the Middle East and other parts of the world. In addition, the Committee notes that with one exception, the cruisers proposed for premature retirement were slated to receive ballistic missile defense capability that has already proven of significant operational relevance and that the elimination of this capability creates further strain on the Department's ability to meet Combatant Commander requirements. In addition, the Committee believes that prematurely retiring capable and relevant ships following an initial investment of no less than $11,600,000,000 in current fiscal year 2012 dollars creates unnecessary and unaffordable future shipbuilding requirements. The Committee notes that current fiscal pressures on the Navy's shipbuilding budget are not likely to be alleviated prior to the end of the next decade, when a large number of surface ships are scheduled for retirement, and significant capital investments will be required to procure the Ohio class replacement submarine and the next Ford class aircraft carrier. By the Navy's own estimates, implementation of the fiscal year 2013 30-year shipbuilding plan requires a significant and sustained increase in the Navy's shipbuilding budget over the next 2 decades. Absent this funding increase, platforms scheduled to be procured will be deferred, and the desired force structure will not be achieved. The Committee notes that over the past 8 years, on average, the Navy's actual ship procurements have been roughly three platforms less than envisioned in the respective shipbuilding plans. Therefore, the Committee questions the wisdom of eliminating force structure with premature ship retirements. Finally, the Committee notes that a ship's expected service life is a significant factor for justifying its extensive up- front investments. Curtailing ship service lives, as the Navy is again proposing, calls into question the Department of the Navy assumptions and specifications when funding new ship acquisitions. The Committee notes that the nine platforms proposed for premature retirement have a combined remaining service life in excess of 120 years, roughly one-third of their service life, and that the Navy shipbuilding plan does not include a sufficient quantity of ships to offset the loss of these platforms. In fact, annual ship procurement will decline from an average of 10 or more battle ships per year in the two previous 5-year shipbuilding plans to approximately 8 battle ships per year in the current 5-year plan. The Committee has been informed that the Navy still believes in the operational relevance and capability of these platforms, and that the decision to request their premature retirement in the fiscal year 2013 budget request was strictly driven by fiscal constraints. Therefore, the Committee recommends denying these proposed premature retirements and retaining this force structure in its entirety. The Committee recommends full funding, as identified by the Navy, to man, operate, sustain, upgrade, equip, and modernize only CG-63, CG- 64, CG-65, CG-66, CG-68, CG-69, CG-73, LSD-41, and LSD-46 in the Ship Modernization, Operations and Sustainment Fund, as specified elsewhere in this act. The Committee recommends full funding for all known requirements only for these platforms for the next 2 fiscal years, and provides the Secretary of the Navy the authority to transfer funds from the Ship Modernization, Operations and Sustainment Fund to the appropriate appropriation accounts in the year of execution following 30- day prior notification to the congressional defense committees. The Committee directs funds to be transferred in accordance with the requirements identified to the Committee by the Navy and further directs that any deviation from those requirements shall be fully and clearly identified to the congressional defense committees prior to the initiation of any such transfer. The Committee believes that this approach provides the fiscal relief required by the Navy to maintain this force structure and allows the Navy sufficient time to plan and budget for this force structure in future budget submissions. Israeli Cooperative Programs.--The fiscal year 2013 budget request includes $99,836,000 in Research, Development, Test and Evaluation, Defense-Wide for Israeli Cooperative Programs, a reduction of $135,864,000 from amounts appropriated in fiscal year 2012. The Committee has been informed that additional funds are required in fiscal year 2013 to accelerate the development and fielding schedules of Israeli Cooperative Programs in light of evolving threats. Therefore, the Committee recommends an additional $168,900,000 for Israeli Cooperative Programs in Research, Development, Test and Evaluation, Defense-Wide, as specifically detailed elsewhere in this act, to include $39,200,000 which shall be used only for Low Rate Initial Production activities as included in the David Sling Weapon System Project Agreement between the two governments. Further, the Committee has been informed by the Department that Israel has additional requirements for the Iron Dome short-range rocket and mortar defense system that will be executed over 4 years with a total cost of $680,000,000. The Department submitted a reprogramming for $70,000,000 to fund the fiscal year 2012 requirement. The Committee has been informed that another $211,000,000 can be executed in fiscal year 2013, which the Committee recommends fully funding in Procurement, Defense-Wide, as authorized in S. 3254, the National Defense Authorization Act for Fiscal Year 2013, as reported. The Committee understands that the Secretary of Defense is committed to requesting the remainder of the required amount in fiscal years 2014 and 2015 based on an annual assessment of Israeli security requirements against an evolving threat. Directed Requirements.--The Army's fiscal year 2013 budget request includes no less than a dozen programs justified as supporting ``Directed Requirements'', which are written and approved by the Army as an alternative approach to the formal acquisition requirements process. The Committee notes that ``Directed Requirements'' are not an element of the Department of Defense Acquisition System, nor are they included in rapid acquisition authorities and processes established to address urgent warfighter needs. Given the Army's history of acquisition failures over the past decade, as documented in the January 2011 Decker-Wagner Army Acquisition Review, the Committee is concerned that the Army is seeking ad-hoc, near- term fixes to its endemic acquisition problems rather than focusing on acquisition process improvements. The Committee does not believe that establishing another deviation from the regular acquisition process is warranted and recommends several adjustments to programs that are justified as ``Directed Requirements''. Network Integration Evaluation [NIE] Transitions.--The fiscal year 2013 budget request includes $214,270,000 in Research, Development, Test and Evaluation, Army to conduct semiannual Network Integration Evaluations. The Committee notes that the Army plans to conduct its fourth and fifth NIEs during fiscal year 2013 and that valuable lessons have been learned from previous NIEs. However, concerns about the planning and execution process remain, to include the governance process for assessing and selecting technologies to test at the NIE, the overlap of planning cycles as a result of conducting two NIEs in a single calendar year, and the manpower and fiscal resources dedicated to these events. To date, the most significant outcomes of the NIEs are the termination or restructures of programs based on performance issues that would likely have been discovered during those programs' regular test phase, to include the Nett Warrior in its original configuration and the Joint Tactical Radio System Ground Mobile Radio. The Committee is concerned, however, that few technologies have transitioned from the NIE. The Committee remains supportive of the Army's NIE and recommends full funding of the fiscal year 2013 budget request; however, the Committee may reconsider its position in future budget years based on the Army's ability to reduce costs and to transition technologies into the acquisition process through appropriate processes where warranted. To facilitate near-team requirements, the Committee recommends transferring $25,000,000 from Research, Development, Test and Evaluation, Army to Other Procurement, Army, as requested by the Army, specifically for nondevelopmental emerging technologies proven at the NIE. In addition, the Committee recommends $28,200,000 in Research, Development, Test and Evaluation, Army for the transition of promising technologies, particularly those developed by nontraditional vendors. The Committee directs that none of the funds from these two funding sources may be obligated or expended until 30 days after written notification to the congressional defense committees by the Assistant Secretary of the Army for Acquisition, Technology, and Logistics regarding the Army's intended use of those funds. Patriot Modernization.--The fiscal year 2013 budget request includes $109,978,000 in Research, Development, Test and Evaluation, Army and $199,565,000 in Missile Procurement, Army for Patriot modernization, a combined increase of $199,818,000 over amounts appropriated in fiscal year 2012. The Committee notes that the Patriot modernization acquisition strategy dates back to 2002 and assumes an Army air and missile defense portfolio significantly different than the one fielded today. In recent years, the Army has terminated multiple air and missile defense programs, to include the Surfaced-Launched Advanced Medium Range Air-to-Air Missile [SLAMRAAM], Joint Land Attack Cruise Missile Defense Elevated Netted Sensor [JLENS] and Medium Extended Air Defense System [MEADS]. In addition, the Army has added several programs in direct support of the war effort, including various Counter-Rocket, Artillery, and Mortar programs and surveillance aerostats. The Committee notes the lack of an approved Patriot modernization strategy and further notes that the Army is currently drafting a Capability Development Document [CDD] which will likely take no less than 1 year to complete. The Committee further notes that there is currently neither an Army Cost Position, nor an Independent Cost Estimate for Patriot modernization, which will likely be an Acquisition Category I program. Regardless, the Army has programmed in excess of $1,000,000,000 for various Patriot modernization initiatives over the next 5 years, most of which would be awarded under sole-source contracts. In addition, the Army has unfunded Patriot modernization requirements, to include the integration of certain capabilities from the MEADS development program, which the Department of Defense has identified as potential candidates for transition to the Army's air and missile defense architecture. The Committee is concerned that the program lacks clearly identified requirements, a competitive acquisition strategy and a full understanding of costs. These are factors that frequently lead to acquisition failures. Therefore, the Committee believes it premature to initiate evolutionary development projects and denies the requested funding increase in Research, Development, Test and Evaluation, Army. The Committee recommends funding developmental Patriot modernization efforts at the same level as in the prior fiscal year. Further, given the warfighter demand for Patriot capabilities, the Committee recommends an increase in Missile Procurement, Army of $82,640,000 over amounts appropriated in fiscal year 2012 for Patriot modernization, and recommends an additional $194,232,000 in Missile Procurement, Army, for the procurement of 50 Patriot PAC-3 missiles in fiscal year 2013 in response to urgent warfighter requirements. B-52 Combat Network Communications Technology [CONECT].-- The fiscal year 2013 budget request includes no funds in Aircraft Procurement, Air Force for the B-52 CONECT program of record due to the Air Force's decision to terminate the program, and $34,700,000 in Research, Development, Test and Evaluation, Air Force for a restructured, descoped B-52 CONECT program. The Committee understands that the Air Force is reviewing its decision to terminate the program of record in light of potential requirements of the Global Strike Command. The Committee further understands that should the Air Force reverse its decision to terminate B-52 CONECT during the fiscal year 2014 budget process, prior year funds would be available to reinstate the program following approval by the congressional defense committees. The Committee directs that no funds for B-52 CONECT program of record post-milestone C activities or a B-52 CONECT restructured program may be obligated or expended until 30 days after the congressional defense committees have been briefed on the Air Force's proposed way ahead, to include certification of full funding of the proposed program. Military Intelligence Programs [MIP] Budget Exhibits.--The Department submits separate classified budget exhibits for the MIP in a format that differs from and is substandard to the format for unclassified programs. In many cases, these classified exhibits present additional detail and supplementary information to the justification provided in the unclassified Procurement or Research, Development, Test and Evaluation [RDT&E] budget exhibits. However, the Committee is concerned about the classified weapon system acquisition programs that are not justified in the unclassified Procurement or RDT&E budget exhibits and are only contained in the classified budget exhibits. The Financial Management Regulation delineates the exhibits that are required for weapon system acquisition programs and does not exclude MIP from this requirement. The Under Secretary of Defense, Comptroller is directed to ensure all MIP are properly justified to the congressional defense committees in accordance with the Financial Management Regulation. 1002 Accounting Reports.--The Committee believes that providing the most up-to-date 1002 accounting information to the congressional defense committees benefits the Department of Defense. Unfortunately, submission of these reports to the congressional defense committees has been inconsistent and, in some cases, inexplicably late. The Committee is aware that the 1002 accounting reports are finalized by the Defense Finance and Accounting Service and received by the services on the 10th calendar day of each month. Therefore, the Committee directs the Assistant Secretaries for Financial Management and Comptroller of each of the Services as well as the Under Secretary of Defense (Comptroller) to submit a 1002 accounting report for each appropriation by the 15th working day of the month for the previous months' data. Solar Energy Development.--The Committee directs the Secretary of Defense and the Secretary of the Interior to jointly prepare a plan to facilitate solar energy development on military installations. The plan should be consistent with the military mission and habitat conservation needs of disturbed lands on military bases that have been withdrawn from the public domain. The Committee directs the Secretaries to submit to the congressional defense and interior committees a joint report that includes the proposed plan within 120 days of enactment of this act. If legislation is necessary to implement the plan, the Committee directs the Secretaries to submit to Congress a legislative proposal to accompany the plan. Furthermore, the Committee directs the Deputy Under Secretary of Defense for Installations and Environment to provide a report to the congressional defense committees not later than 180 days after enactment of this act on the viability or incompatibility of solar energy for Nellis and Creech Air Force Bases. Base Security.--The fiscal year 2013 budget request includes substantial funding for the Department of Defense [DOD] to continue deployment of separate and incompatible systems and programs to credential uniform military and DOD civilian personnel, vendors, contractors, and visitors, and also electronically manage access to military installations. The Committee is aware that commercial off-the-shelf solutions that provide the technical platform and infrastructure, vendor/ contractor enrollment, vetting, credentialing, and access privilege management program and physical access control system are in use at over 80 installations at no cost to the government. Furthermore, the Committee has been informed that demonstrations are underway which expand this solution to management of uniform military, DOD civilians, military retirees, and military dependants. Therefore, the Committee recommends that the Department standardize program policy and system requirements for personnel credentialing and installation access systems. The program policy and system requirements should recognize and encourage private sector partnerships utilizing currently available qualified systems and programs that can avoid substantial out-year acquisition and sustainment costs. The Committee directs the Secretary of Defense to report to the congressional defense committees within 90 days of enactment of this act, the total funding allocated across the Department for all personnel credentialing and installation access control activities in fiscal year 2013 by appropriation, broken down by systems and programs currently in use, systems and programs being deployed, systems and programs in research and development, and the estimated life-cycle cost avoidance to the Department of utilizing qualified private sector systems and programs. Suicide Prevention.--The Committee applauds the efforts of the Department regarding suicide prevention but shares the concern of the Secretary of Defense that more can and should be done to address this tragic situation. Therefore, the Committee encourages the Office of Suicide Prevention to consider funding community-based initiatives to include efforts that will assist Reserve Component Forces and their families after the transitional healthcare period has ended. TITLE I MILITARY PERSONNEL Funds appropriated under this title provide the resources required for basic pay, retired pay accrual, employers' contribution for Social Security taxes, basic allowance for subsistence, basic allowance for housing, special and incentive pays, permanent change of station travel, and other personnel costs for uniformed members of the Armed Forces. The President's fiscal year 2013 budget requests a total of $128,430,025,000 for military personnel appropriations. This request funds an Active component end strength of 1,401,000 and a Reserve component end strength of 837,400. SUMMARY OF COMMITTEE ACTION The Committee recommends military personnel appropriations totaling $127,502,463,000 for fiscal year 2013. This is $927,562,000 below the budget estimate. Committee recommended military personnel appropriations for fiscal year 2013 are summarized below: SUMMARY OF MILITARY PERSONNEL APPROPRIATIONS [In thousands of dollars] ---------------------------------------------------------------------------------------------------------------- Change from Account 2013 budget Committee budget estimate recommendation estimate ---------------------------------------------------------------------------------------------------------------- Military Personnel: Military Personnel, Army.................................... 40,777,844 40,157,392 -620,452 Military Personnel, Navy.................................... 27,090,893 26,989,384 -101,509 Military Personnel, Marine Corps............................ 12,481,050 12,529,469 +48,419 Military Personnel, Air Force............................... 28,048,539 28,053,829 +5,290 Reserve Personnel: Reserve Personnel, Army..................................... 4,513,753 4,341,823 -171,930 Reserve Personnel, Navy..................................... 1,898,668 1,875,598 -23,070 Reserve Personnel, Marine Corps............................. 664,641 659,621 -5,020 Reserve Personnel, Air Force................................ 1,741,365 1,728,505 -12,860 National Guard Personnel: National Guard Personnel, Army.............................. 8,103,207 8,005,077 -98,130 National Guard Personnel, Air Force......................... 3,110,065 3,161,765 +51,700 ----------------------------------------------- Total..................................................... 128,430,025 127,502,463 -927,562 ---------------------------------------------------------------------------------------------------------------- Committee recommended end strengths for fiscal year 2013 are summarized below: RECOMMENDED END STRENGTH ---------------------------------------------------------------------------------------------------------------- 2012 2013 budget Committee Change from Item authorization estimate recommendation budget estimate ---------------------------------------------------------------------------------------------------------------- Active: Army................................ 562,000 552,100 552,100 ................ Navy................................ 325,700 322,700 322,700 ................ Marine Corps........................ 202,100 197,300 197,300 ................ Air Force........................... 332,800 328,900 329,597 +697 ----------------------------------------------------------------------- Subtotal.......................... 1,422,600 1,401,000 1,401,697 +697 ======================================================================= Selected Reserve: Army Reserve........................ 205,000 205,000 205,000 ................ Navy Reserve........................ 66,200 62,500 62,500 ................ Marine Corps Reserve................ 39,600 39,600 39,600 ................ Air Force Reserve................... 71,400 70,500 74,428 +3,928 Army National Guard................. 358,200 358,200 358,200 ................ Air National Guard.................. 106,700 101,600 106,435 +4,835 ----------------------------------------------------------------------- Subtotal.......................... 847,100 837,400 846,163 +8,763 ======================================================================= TOTAL............................. 2,269,700 2,238,400 2,247,860 +9,460 ---------------------------------------------------------------------------------------------------------------- Committee recommended end strengths for full-time support of the Reserve and Guard for fiscal year 2013 are summarized below: RECOMMENDED ACTIVE GUARD AND RESERVE END STRENGTH ---------------------------------------------------------------------------------------------------------------- 2012 2013 budget Committee Change from Item authorization estimate recommendation budget estimate ---------------------------------------------------------------------------------------------------------------- Active Guard and Reserve: Army Reserve........................ 16,261 16,277 16,277 ................ Navy Reserve........................ 10,337 10,114 10,114 ................ Marine Corps Reserve................ 2,261 2,261 2,261 ................ Air Force Reserve................... 2,662 2,888 2,888 ................ Army National Guard................. 32,060 32,060 32,060 ................ Air National Guard.................. 14,833 14,871 14,871 ................ ----------------------------------------------------------------------- TOTAL............................. 78,414 78,471 78,471 ................ ---------------------------------------------------------------------------------------------------------------- Military Personnel Overview Reserve Component Budget Reporting.--The Committee continues its requirement for the Department to provide a semiannual detailed report to the congressional defense committees showing transfers between subactivities within the military personnel appropriation. Reports shall be submitted not later than 30 days following the end of the second quarter and 30 days following the end of the fiscal year. Funding for Identified Shortfalls.--The Committee recommends an additional $200,000,000 for the Army to address a shortfall caused by a costlier officer grade mix and $192,000,000 for the Air Force for a housing privatization contract award delay from fiscal year 2012 to fiscal year 2013. Permanent Change of Station [PCS].--Beginning in 2010, the Department of Defense began an effort to find significant efficiencies within its budget and continues to pursue efficiencies in its programs and operations to identify additional savings. The Committee believes that one area that has not been addressed and could yield significant savings is reducing the number of PCS moves by increasing the length of military tours. The Department of Defense moves about one-third of all military servicemembers each year and the average duration time between PCS moves is about 2 years. The Committee believes that increasing tour lengths will not only result in cost savings, but it will also lead to less stress on the force and hardship on families that are forced to move frequently. In addition, longer tours will ultimately lead to better performance since servicemembers will have more time in a specific job before departing. In order to begin the process of decreasing the number of PCS moves annually, the Committee recommends a total reduction of $293,585,000 across the services. This reduction equates to a 10 percent reduction to operational and rotational PCS accounts but excludes all PCS moves associated with accession, training, and separation. Furthermore, the Committee directs the Under Secretary for Personnel and Readiness to provide a report to the congressional defense committees not later than 180 days after the enactment of this act which lays out a plan for the Department of Defense to increase the length of tours. The report should include an analysis on the impact of increased tour lengths for families, quality of life, and job performance. It should make recommendations for the services to implement if increased tour lengths lead to fewer promotion opportunities and PCS options for servicemembers and their families serving in hardship locations. Finally, the report should identify the cost savings associated with increasing tour lengths. Unobligated Balances.--A Government Accountability Office analysis of past year obligation rates shows that the services continue to underexecute their military personnel accounts. Due to excess unobligated balances, the Committee recommends a total reduction of $74,470,000 from the fiscal year 2013 military personnel accounts. Air National Guard Maintenance Positions.--The Committee has been informed that an agreement was reached between the Air National Guard and Pacific Air Forces [PACAF] to continue to use dual status maintenance technicians to perform maintenance on the additional four KC-135 aircraft that were transitioned to PACAF in a prior year Base Realignment and Closure initiative. This agreement would save the Air Force over $6,000,000 since the Air Force would not be required to execute permanent change of station moves for 108 active duty airmen to perform the mission. This agreement is in jeopardy, however, due to Resource Management Directive 703 [RMD 703], which freezes civilian end strength at the fiscal year 2010 level. The Committee believes that the intent of RMD 703 was to produce cost savings, not give the services additional bills to pay. Therefore, the Committee strongly encourages the Department of Defense to provide exemptions to RMD 703 where savings can be identified and achieved. Military Personnel, Army Appropriations, 2012.................................... $43,298,409,000 Budget estimate, 2013................................... 40,777,844,000 House allowance......................................... 40,730,014,000 Committee recommendation................................ 40,157,392,000 The Committee recommends an appropriation of $40,157,392,000. This is $620,452,000 below the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [In thousands of dollars] -------------------------------------------------------------------------------------------------------------------------------------------------------- Change from 2013 budget House Committee ------------------------------- Item estimate allowance recommendation Budget House estimate allowance -------------------------------------------------------------------------------------------------------------------------------------------------------- MILITARY PERSONNEL, ARMY ACTIVITY 1: PAY AND ALLOWANCES OF OFFICERS BASIC PAY 6,046,542 6,046,542 6,237,542 +191,000 +191,000 RETIRED PAY ACCRUAL 1,936,899 1,936,899 1,936,899 .............. .............. BASIC ALLOWANCE FOR HOUSING 1,852,895 1,852,895 1,852,895 .............. .............. BASIC ALLOWANCE FOR SUBSISTENCE 252,272 252,272 252,272 .............. .............. INCENTIVE PAYS 102,530 102,530 102,530 .............. .............. SPECIAL PAYS 340,023 340,023 340,023 .............. .............. ALLOWANCES 232,696 232,696 232,696 .............. .............. SEPARATION PAY 90,679 90,679 90,679 .............. .............. SOCIAL SECURITY TAX 460,046 460,046 460,046 .............. .............. --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 1 11,314,582 11,314,582 11,505,582 +191,000 +191,000 ACTIVITY 2: PAY AND ALLOWANCES OF ENLISTED PERSONNEL BASIC PAY 13,198,604 13,198,604 12,548,604 -650,000 -650,000 RETIRED PAY ACCRUAL 4,233,149 4,233,149 4,233,149 .............. .............. BASIC ALLOWANCE FOR HOUSING 4,735,765 4,735,765 4,735,765 .............. .............. INCENTIVE PAYS 114,035 114,035 114,035 .............. .............. SPECIAL PAYS 699,801 687,801 681,801 -18,000 -6,000 ALLOWANCES 880,308 880,308 880,308 .............. .............. SEPARATION PAY 378,455 378,455 378,455 .............. .............. SOCIAL SECURITY TAX 1,009,678 1,009,678 1,009,678 .............. .............. --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 2 25,249,795 25,237,795 24,581,795 -668,000 -656,000 ACTIVITY 3: PAY AND ALLOWANCES OF CADETS ACADEMY CADETS 77,680 77,680 77,680 .............. .............. ACTIVITY 4: SUBSISTENCE OF ENLISTED PERSONNEL BASIC ALLOWANCE FOR SUBSISTENCE 1,357,570 1,357,570 1,357,570 .............. .............. SUBSISTENCE-IN-KIND 753,551 753,551 728,551 -25,000 -25,000 FAMILY SUBSISTENCE SUPPLEMENTAL ALLOWANCE 1,911 1,911 1,911 .............. .............. --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 4 2,113,032 2,113,032 2,088,032 -25,000 -25,000 ACTIVITY 5: PERMANENT CHANGE OF STATION ACCESSION TRAVEL 163,294 163,294 163,294 .............. .............. TRAINING TRAVEL 167,995 167,995 167,995 .............. .............. OPERATIONAL TRAVEL 495,917 495,917 446,325 -49,592 -49,592 ROTATIONAL TRAVEL 677,396 677,396 609,656 -67,740 -67,740 SEPARATION TRAVEL 193,262 193,262 193,262 .............. .............. TRAVEL OF ORGANIZED UNITS 12,150 12,150 12,150 .............. .............. NON-TEMPORARY STORAGE 9,726 9,726 9,726 .............. .............. TEMPORARY LODGING EXPENSE 67,841 67,841 67,841 .............. .............. --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 5 1,787,581 1,787,581 1,670,249 -117,332 -117,332 ACTIVITY 6: OTHER MILITARY PERSONNEL COSTS APPREHENSION OF MILITARY DESERTERS 1,434 1,434 1,434 .............. .............. INTEREST ON UNIFORMED SERVICES SAVINGS 687 687 687 .............. .............. DEATH GRATUITIES 62,800 62,800 62,800 .............. .............. UNEMPLOYMENT BENEFITS 264,874 264,874 264,874 .............. .............. EDUCATION BENEFITS 698 698 698 .............. .............. ADOPTION EXPENSES 494 494 494 .............. .............. TRANSPORTATION SUBSIDY 7,436 7,436 7,436 .............. .............. PARTIAL DISLOCATION ALLOWANCE 428 428 428 .............. .............. RESERVE OFFICERS TRAINING CORPS [ROTC] 107,370 107,370 107,370 .............. .............. JUNIOR ROTC 42,845 42,845 42,845 .............. .............. --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 6 489,066 489,066 489,066 .............. .............. LESS REIMBURSABLES -253,892 -253,892 -253,892 .............. .............. UNDISTRIBUTED ADJUSTMENT .............. -35,830 -1,120 -1,120 +34,710 ================================================================================= TOTAL, ACTIVE FORCES, ARMY 40,777,844 40,730,014 40,157,392 -620,452 -572,622 --------------------------------------------------------------------------------- TOTAL, MILITARY PERSONNEL, ARMY 40,777,844 40,730,014 40,157,392 -620,452 -572,622 -------------------------------------------------------------------------------------------------------------------------------------------------------- COMMITTEE RECOMMENDED ADJUSTMENTS The following table details the adjustments recommended by the Committee: [In thousands of dollars] ---------------------------------------------------------------------------------------------------------------- 2013 budget Committee Change from Line Item request recommendation budget request ---------------------------------------------------------------------------------------------------------------- BA 1: PAY AND ALLOWANCES OF OFFICERS 5 Basic Pay 6,046,542 6,237,542 +191,000 Lower than Budgeted Strength Levels .............. .............. -9,000 Army Identified Shortfall for Officer Pay .............. .............. +200,000 BA 2: PAY AND ALLOWANCES OF ENLISTED PERSONNEL 60 Basic Pay 13,198,604 12,548,604 -650,000 Lower than Budgeted Strength Levels .............. .............. -50,000 Army Requested Transfer to Title IX: Basic Pay .............. .............. -182,000 Officers Army Requested Transfer to Title IX: Basic Pay .............. .............. -418,000 Enlisted 90 Special Pays 699,801 681,801 -18,000 Enlistment Bonuses--Army Requested Transfer to Loan .............. .............. -18,000 Repayment Program Reenlistment Bonuses--Excess to Requirement .............. .............. -18,000 Loan Repayment Program--Army Requested Transfer from .............. .............. +18,000 Enlistment Bonuses to Meet Identified Shortfall BA 4: SUBSISTENCE OF ENLISTED PERSONNEL 120 Subsistence-In-Kind 753,551 728,551 -25,000 Army Requested Transfer to Title IX: Subsistence-In- .............. .............. -25,000 Kind BA 5: PERMANENT CHANGE OF STATION TRAVEL 135 Operational Travel 495,917 446,325 -49,592 PCS Reduction .............. .............. -49,592 140 Rotational Travel 677,396 609,656 -67,740 PCS Reduction .............. .............. -67,740 UNDISTRIBUTED ADJUSTMENT Unobligated Balances .............. -1,120 -1,120 ---------------------------------------------------------------------------------------------------------------- Military Personnel, Navy Appropriations, 2012.................................... $26,803,334,000 Budget estimate, 2013................................... 27,090,893,000 House allowance......................................... 27,075,933,000 Committee recommendation................................ 26,989,384,000 The Committee recommends an appropriation of $26,989,384,000. This is $101,509,000 below the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [In thousands of dollars] -------------------------------------------------------------------------------------------------------------------------------------------------------- Change from 2013 budget House Committee ------------------------------- Item estimate allowance recommendation Budget House estimate allowance -------------------------------------------------------------------------------------------------------------------------------------------------------- MILITARY PERSONNEL, NAVY ACTIVITY 1: PAY AND ALLOWANCES OF OFFICERS BASIC PAY 3,949,301 3,952,572 3,949,301 .............. -3,271 RETIRED PAY ACCRUAL 1,266,753 1,267,803 1,266,753 .............. -1,050 BASIC ALLOWANCE FOR HOUSING 1,381,431 1,382,432 1,381,431 .............. -1,001 BASIC ALLOWANCE FOR SUBSISTENCE 158,373 158,494 158,373 .............. -121 INCENTIVE PAYS 135,303 135,303 135,303 .............. .............. SPECIAL PAYS 423,059 423,059 423,059 .............. .............. ALLOWANCES 108,203 108,203 108,203 .............. .............. SEPARATION PAY 33,001 27,308 27,308 -5,693 .............. SOCIAL SECURITY TAX 300,287 300,537 300,287 .............. -250 --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 1 7,755,711 7,755,711 7,750,018 -5,693 -5,693 ACTIVITY 2: PAY AND ALLOWANCES OF ENLISTED PERSONNEL BASIC PAY 8,439,026 8,458,028 8,439,026 .............. -19,002 RETIRED PAY ACCRUAL 2,708,787 2,714,887 2,708,787 .............. -6,100 BASIC ALLOWANCE FOR HOUSING 3,864,310 3,870,228 3,864,310 .............. -5,918 INCENTIVE PAYS 101,491 101,491 101,491 .............. .............. SPECIAL PAYS 699,482 699,482 699,482 .............. .............. ALLOWANCES 515,163 515,163 515,163 .............. .............. SEPARATION PAY 229,632 196,489 196,489 -33,143 .............. SOCIAL SECURITY TAX 645,586 647,040 645,586 .............. -1,454 --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 2 17,203,477 17,202,808 17,170,334 -33,143 -32,474 ACTIVITY 3: PAY AND ALLOWANCES OF MIDSHIPMEN MIDSHIPMEN 76,628 76,628 76,628 .............. .............. ACTIVITY 4: SUBSISTENCE OF ENLISTED PERSONNEL BASIC ALLOWANCE FOR SUBSISTENCE 751,528 752,197 751,528 .............. -669 SUBSISTENCE-IN-KIND 429,247 429,247 429,247 .............. .............. FAMILY SUBSISTENCE SUPPLEMENTAL ALLOWANCE 13 13 13 .............. .............. --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 4 1,180,788 1,181,457 1,180,788 .............. -669 ACTIVITY 5: PERMANENT CHANGE OF STATION ACCESSION TRAVEL 90,302 90,302 90,302 .............. .............. TRAINING TRAVEL 119,663 119,663 119,663 .............. .............. OPERATIONAL TRAVEL 271,324 271,324 244,192 -27,132 -27,132 ROTATIONAL TRAVEL 313,309 313,309 281,978 -31,331 -31,331 SEPARATION TRAVEL 138,273 138,273 138,273 .............. .............. TRAVEL OF ORGANIZED UNITS 24,342 24,342 24,342 .............. .............. NON-TEMPORARY STORAGE 5,700 5,700 5,700 .............. .............. TEMPORARY LODGING EXPENSE 6,426 6,426 6,426 .............. .............. OTHER 5,622 5,622 5,622 .............. .............. --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 5 974,961 974,961 916,498 -58,463 -58,463 ACTIVITY 6: OTHER MILITARY PERSONNEL COSTS APPREHENSION OF MILITARY DESERTERS 262 262 262 .............. .............. INTEREST ON UNIFORMED SERVICES SAVINGS 2,464 2,464 2,464 .............. .............. DEATH GRATUITIES 16,100 16,100 16,100 .............. .............. UNEMPLOYMENT BENEFITS 103,735 106,735 103,735 .............. -3,000 EDUCATION BENEFITS 23,758 23,758 20,758 -3,000 -3,000 ADOPTION EXPENSES 275 275 275 .............. .............. TRANSPORTATION SUBSIDY 6,254 6,254 6,254 .............. .............. PARTIAL DISLOCATION ALLOWANCE 57 57 57 .............. .............. ROTC 22,945 22,945 22,945 .............. .............. JUNIOR ROTC 12,784 12,784 12,784 .............. .............. --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 6 188,634 191,634 185,634 -3,000 -6,000 LESS REIMBURSABLES -289,306 -289,306 -289,306 .............. .............. UNDISTRIBUTED ADJUSTMENT .............. -17,960 -1,210 -1,210 +16,750 ================================================================================= TOTAL, ACTIVE FORCES, NAVY 27,090,893 27,075,933 26,989,384 -101,509 -86,549 --------------------------------------------------------------------------------- TOTAL, MILITARY PERSONNEL, NAVY 27,090,893 27,075,933 26,989,384 -101,509 -86,549 -------------------------------------------------------------------------------------------------------------------------------------------------------- COMMITTEE RECOMMENDED ADJUSTMENTS The following table details the adjustments recommended by the Committee: [In thousands of dollars] ---------------------------------------------------------------------------------------------------------------- Change from Line Item 2013 budget Committee budget estimate recommendation estimate ---------------------------------------------------------------------------------------------------------------- BA 1: PAY AND ALLOWANCES OF OFFICERS 50 Separation Pay 33,001 27,308 -5,693 Retain Four Cruisers .............. .............. -5,693 BA 2: PAY AND ALLOWANCES OF ENLISTED PERSONNEL 100 Separation Pay 229,632 196,489 -33,143 Retain Four Cruisers .............. .............. -33,143 BA 5: PERMANENT CHANGE OF STATION TRAVEL 135 Operational Travel 271,324 244,192 -27,132 PCS Reduction .............. .............. -27,132 140 Rotational Travel 313,309 281,978 -31,331 PCS Reduction .............. .............. -31,331 BA 6: OTHER MILITARY PERSONNEL COSTS 195 Education Benefits 23,758 20,758 -3,000 Excess to Requirement .............. .............. -3,000 UNDISTRIBUTED ADJUSTMENT Unobligated Balances .............. -1,210 -1,210 ---------------------------------------------------------------------------------------------------------------- Military Personnel, Marine Corps Appropriations, 2012.................................... $13,635,136,000 Budget estimate, 2013................................... 12,481,050,000 House allowance......................................... 12,560,999,000 Committee recommendation................................ 12,529,469,000 The Committee recommends an appropriation of $12,529,469,000. This is $48,419,000 above the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [In thousands of dollars] -------------------------------------------------------------------------------------------------------------------------------------------------------- Change from 2013 budget House Committee ------------------------------- Item estimate allowance recommendation Budget House estimate allowance -------------------------------------------------------------------------------------------------------------------------------------------------------- MILITARY PERSONNEL, MARINE CORPS ACTIVITY 1: PAY AND ALLOWANCES OF OFFICERS BASIC PAY 1,331,519 1,331,519 1,331,519 .............. .............. RETIRED PAY ACCRUAL 427,088 427,088 427,088 .............. .............. BASIC ALLOWANCE FOR HOUSING 446,183 446,183 446,183 .............. .............. BASIC ALLOWANCE FOR SUBSISTENCE 57,318 57,318 57,318 .............. .............. INCENTIVE PAYS 52,549 52,549 47,549 -5,000 -5,000 SPECIAL PAYS 21,356 21,356 21,356 .............. .............. ALLOWANCES 35,637 35,637 35,637 .............. .............. SEPARATION PAY 15,056 39,459 39,459 +24,403 .............. SOCIAL SECURITY TAX 100,832 100,832 100,832 .............. .............. --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 1 2,487,538 2,511,941 2,506,941 +19,403 -5,000 ACTIVITY 2: PAY AND ALLOWANCES OF ENLISTED PERSONNEL BASIC PAY 4,617,777 4,617,777 4,601,777 -16,000 -16,000 RETIRED PAY ACCRUAL 1,478,142 1,478,142 1,478,142 .............. .............. BASIC ALLOWANCE FOR HOUSING 1,639,289 1,639,289 1,639,289 .............. .............. INCENTIVE PAYS 9,832 9,832 9,832 .............. .............. SPECIAL PAYS 165,326 165,326 151,326 -14,000 -14,000 ALLOWANCES 302,682 302,682 299,682 -3,000 -3,000 SEPARATION PAY 71,143 164,337 164,337 +93,194 .............. SOCIAL SECURITY TAX 352,300 352,300 352,300 .............. .............. --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 2 8,636,491 8,729,685 8,696,685 +60,194 -33,000 ACTIVITY 4: SUBSISTENCE OF ENLISTED PERSONNEL BASIC ALLOWANCE FOR SUBSISTENCE 421,262 421,262 421,262 .............. .............. SUBSISTENCE-IN-KIND 315,470 315,470 315,470 .............. .............. FAMILY SUBSISTENCE SUPPLEMENTAL ALLOWANCE 50 50 50 .............. .............. --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 4 736,782 736,782 736,782 .............. .............. ACTIVITY 5: PERMANENT CHANGE OF STATION ACCESSION TRAVEL 65,546 65,546 60,546 -5,000 -5,000 TRAINING TRAVEL 13,060 13,060 13,060 .............. .............. OPERATIONAL TRAVEL 222,404 222,404 200,164 -22,240 -22,240 ROTATIONAL TRAVEL 104,397 104,397 93,957 -10,440 -10,440 SEPARATION TRAVEL 84,374 88,506 88,506 +4,132 .............. TRAVEL OF ORGANIZED UNITS 768 768 768 .............. .............. NON-TEMPORARY STORAGE 6,600 6,600 6,600 .............. .............. TEMPORARY LODGING EXPENSE 14,621 14,621 14,621 .............. .............. OTHER 3,387 3,387 3,387 .............. .............. --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 5 515,157 519,289 481,609 -33,548 -37,680 ACTIVITY 6: OTHER MILITARY PERSONNEL COSTS APPREHENSION OF MILITARY DESERTERS 968 968 968 .............. .............. INTEREST ON UNIFORMED SERVICES SAVINGS 19 19 19 .............. .............. DEATH GRATUITIES 10,100 10,100 10,100 .............. .............. UNEMPLOYMENT BENEFITS 104,060 112,060 112,060 +8,000 .............. EDUCATION BENEFITS 4,105 4,105 4,105 .............. .............. ADOPTION EXPENSES 73 73 73 .............. .............. TRANSPORTATION SUBSIDY 3,048 3,048 3,048 .............. .............. PARTIAL DISLOCATION ALLOWANCE 159 159 159 .............. .............. JUNIOR ROTC 5,911 5,911 5,911 .............. .............. --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 6 128,443 136,443 136,443 +8,000 .............. LESS REIMBURSABLES -23,361 -23,361 -23,361 .............. .............. UNDISTRIBUTED ADJUSTMENT .............. -49,780 -5,630 -5,630 +44,150 ================================================================================= TOTAL, ACTIVE FORCES, MARINE CORPS 12,481,050 12,560,999 12,529,469 +48,419 -31,530 --------------------------------------------------------------------------------- TOTAL, MILITARY PERSONNEL, MARINE CORPS 12,481,050 12,560,999 12,529,469 +48,419 -31,530 -------------------------------------------------------------------------------------------------------------------------------------------------------- COMMITTEE RECOMMENDED ADJUSTMENTS The following table details the adjustments recommended by the Committee: [In thousands of dollars] ---------------------------------------------------------------------------------------------------------------- Change from Line Item 2013 budget Committee budget estimate recommendation estimate ---------------------------------------------------------------------------------------------------------------- BA 1: PAY AND ALLOWANCES OF OFFICERS 35 Incentive Pays 52,549 47,549 -5,000 Aviation Continuation Bonus--Excess to Requirement .............. .............. -5,000 50 Separation Pay 15,056 39,459 +24,403 Marine Corps Requested Transfer from Procurement, .............. .............. +24,403 Marine Corps Line 2 to Meet Identified Shortfall BA 2: PAY AND ALLOWANCES OF ENLISTED PERSONNEL 60 Basic Pay 4,617,777 4,601,777 -16,000 Lower than Budgeted Strength Levels .............. .............. -16,000 90 Special Pays 165,326 151,326 -14,000 Hardship/Location Pays--Projected Underexecution .............. .............. -4,000 Reenlistment Bonuses--Excess to Requirement .............. .............. -10,000 95 Allowances 302,682 299,682 -3,000 Clothing Allowance--Projected Underexecution .............. .............. -3,000 100 Separation Pay 71,143 164,337 +93,194 Marine Corps Requested Transfer from Procurement, .............. .............. +93,194 Marine Corps Line 2 to Meet Identified Shortfall BA 5: PERMANENT CHANGE OF STATION TRAVEL 125 Accession Travel 65,546 60,546 -5,000 Lower than Budgeted Strength Levels .............. .............. -5,000 135 Operational Travel 222,404 200,164 -22,240 PCS Reduction .............. .............. -22,240 140 Rotational Travel 104,397 93,957 -10,440 PCS Reduction .............. .............. -10,440 145 Separation Travel 84,374 88,506 +4,132 Marine Corps Requested Transfer from Procurement, .............. .............. +4,132 Marine Corps Line 2 to Meet Identified Shortfall BA 6: OTHER MILITARY PERSONNEL COSTS 185 Unemployment Benefits 104,060 112,060 +8,000 Marine Corps Requested Transfer from Procurement, .............. .............. +8,000 Marine Corps Line 2 to Meet Identified Shortfall UNDISTRIBUTED ADJUSTMENT Unobligated Balances .............. -5,630 -5,630 ---------------------------------------------------------------------------------------------------------------- Military Personnel, Air Force Appropriations, 2012.................................... $28,096,708,000 Budget estimate, 2013................................... 28,048,539,000 House allowance......................................... 28,124,109,000 Committee recommendation................................ 28,053,829,000 The Committee recommends an appropriation of $28,053,829,000. This is $5,290,000 above the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [In thousands of dollars] -------------------------------------------------------------------------------------------------------------------------------------------------------- Change from 2013 budget House Committee ------------------------------- Item estimate allowance recommendation Budget House estimate allowance -------------------------------------------------------------------------------------------------------------------------------------------------------- MILITARY PERSONNEL, AIR FORCE ACTIVITY 1: PAY AND ALLOWANCES OF OFFICERS BASIC PAY 4,879,598 4,857,898 4,829,598 -50,000 -28,300 RETIRED PAY ACCRUAL 1,558,889 1,558,889 1,543,889 -15,000 -15,000 BASIC ALLOWANCE FOR HOUSING 1,398,746 1,423,346 1,437,946 +39,200 +14,600 BASIC ALLOWANCE FOR SUBSISTENCE 196,731 196,731 196,731 .............. .............. INCENTIVE PAYS 218,362 218,362 218,362 .............. .............. SPECIAL PAYS 303,583 303,583 303,583 .............. .............. ALLOWANCES 142,100 142,100 142,100 .............. .............. SEPARATION PAY 61,644 61,644 61,644 .............. .............. SOCIAL SECURITY TAX 371,372 371,372 371,372 .............. .............. --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 1 9,131,025 9,133,925 9,105,225 -25,800 -28,700 ACTIVITY 2: PAY AND ALLOWANCES OF ENLISTED PERSONNEL BASIC PAY 8,715,826 8,715,826 8,715,826 .............. .............. RETIRED PAY ACCRUAL 2,789,838 2,789,838 2,789,838 .............. .............. BASIC ALLOWANCE FOR HOUSING 3,361,407 3,456,507 3,514,207 +152,800 +57,700 INCENTIVE PAYS 40,899 40,899 40,899 .............. .............. SPECIAL PAYS 363,794 363,794 363,794 .............. .............. ALLOWANCES 590,662 590,662 590,662 .............. .............. SEPARATION PAY 137,532 137,532 137,532 .............. .............. SOCIAL SECURITY TAX 666,760 666,760 666,760 .............. .............. --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 2 16,666,718 16,761,818 16,819,518 +152,800 +57,700 ACTIVITY 3: PAY AND ALLOWANCES OF CADETS ACADEMY CADETS 70,369 70,369 70,369 .............. .............. ACTIVITY 4: SUBSISTENCE OF ENLISTED PERSONNEL BASIC ALLOWANCE FOR SUBSISTENCE 1,008,796 1,008,796 1,008,796 .............. .............. SUBSISTENCE-IN-KIND 146,157 146,157 146,157 .............. .............. FAMILY SUBSISTENCE SUPPLEMENTAL ALLOWANCE 34 34 34 .............. .............. --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 4 1,154,987 1,154,987 1,154,987 .............. .............. ACTIVITY 5: PERMANENT CHANGE OF STATION ACCESSION TRAVEL 87,255 87,255 87,255 .............. .............. TRAINING TRAVEL 75,236 75,236 70,236 -5,000 -5,000 OPERATIONAL TRAVEL 320,117 320,117 288,105 -32,012 -32,012 ROTATIONAL TRAVEL 530,984 530,984 447,886 -83,098 -83,098 SEPARATION TRAVEL 187,760 187,760 158,760 -29,000 -29,000 TRAVEL OF ORGANIZED UNITS 15,779 15,779 15,779 .............. .............. NON-TEMPORARY STORAGE 42,843 42,843 42,843 .............. .............. TEMPORARY LODGING EXPENSE 30,281 30,281 30,281 .............. .............. --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 5 1,290,255 1,290,255 1,141,145 -149,110 -149,110 ACTIVITY 6: OTHER MILITARY PERSONNEL COSTS APPREHENSION OF MILITARY DESERTERS 149 149 149 .............. .............. INTEREST ON UNIFORMED SERVICES SAVINGS 2,514 2,514 2,514 .............. .............. DEATH GRATUITIES 16,000 16,000 16,000 .............. .............. UNEMPLOYMENT BENEFITS 71,683 71,683 71,683 .............. .............. EDUCATION BENEFITS 340 340 340 .............. .............. ADOPTION EXPENSES 519 519 519 .............. .............. TRANSPORTATION SUBSIDY 5,326 5,326 5,326 .............. .............. PARTIAL DISLOCATION ALLOWANCE 1,975 1,975 1,975 .............. .............. RESERVE OFFICERS TRAINING CORPS [ROTC] 37,228 37,228 37,228 .............. .............. JUNIOR ROTC 16,565 16,565 16,565 .............. .............. --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 6 152,299 152,299 152,299 .............. .............. LESS REIMBURSABLES -417,114 -417,114 -417,114 .............. .............. UNDISTRIBUTED ADJUSTMENT .............. -22,430 27,400 +27,400 +49,830 ================================================================================= TOTAL, ACTIVE FORCES, AIR FORCE 28,048,539 28,124,109 28,053,829 +5,290 -70,280 --------------------------------------------------------------------------------- TOTAL, MILITARY PERSONNEL, AIR FORCE 28,048,539 28,124,109 28,053,829 +5,290 -70,280 -------------------------------------------------------------------------------------------------------------------------------------------------------- COMMITTEE RECOMMENDED ADJUSTMENTS The following table details the adjustments recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ 2013 budget Committee Change from Line Item estimate recommendation budget request ------------------------------------------------------------------------ BA 1: PAY AND ALLOWANCES OF OFFICERS 5 Basic Pay 4,879,598 4,829,598 -50,000 Lower than .............. .............. -50,000 Budgeted Strength Levels 10 Retired Pay 1,558,889 1,543,889 -15,000 Accrual Lower than .............. .............. -15,000 Budgeted Strength Levels 25 Basic Allowance 1,398,746 1,437,946 +39,200 For Housing Air Force .............. .............. +39,200 Identified Shortfall BA 2: PAY AND ALLOWANCES OF ENLISTED PERSONNEL 80 Basic Allowance 3,361,407 3,514,207 +152,800 For Housing Air Force .............. .............. +152,800 Identified Shortfall BA 5: PERMANENT CHANGE OF STATION TRAVEL 130 Training Travel 75,236 70,236 -5,000 Excess to .............. .............. -5,000 Requiremen t 135 Operational 320,117 288,105 -32,012 Travel PCS .............. .............. -32,012 Reduction 140 Rotational 530,984 447,886 -83,098 Travel Excess to .............. .............. -30,000 Requiremen t PCS .............. .............. -53,098 Reduction 145 Separation 187,760 158,760 -29,000 Travel Excess to .............. .............. -29,000 Requiremen t UNDISTRIBUTED ADJUSTMENT Retain Air .............. 27,400 +27,400 Force Force Structure ------------------------------------------------------------------------ Reserve Personnel, Army Appropriations, 2012.................................... $4,289,407,000 Budget estimate, 2013................................... 4,513,753,000 House allowance......................................... 4,456,823,000 Committee recommendation................................ 4,341,823,000 The Committee recommends an appropriation of $4,341,823,000. This is $171,930,000 below the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [In thousands of dollars] -------------------------------------------------------------------------------------------------------------------------------------------------------- Change from 2013 budget House Committee ------------------------------- Item estimate allowance recommendation Budget House estimate allowance -------------------------------------------------------------------------------------------------------------------------------------------------------- RESERVE PERSONNEL, ARMY ACTIVITY 1: RESERVE COMPONENT TRAINING AND SUPPORT PAY GROUP A TRAINING (15 DAYS AND DRILLS 24/48) 1,447,614 1,447,614 1,411,614 -36,000 -36,000 PAY GROUP B TRAINING (BACKFILL FOR ACTIVE DUTY) 38,868 38,868 38,868 .............. .............. PAY GROUP F TRAINING (RECRUITS) 275,318 275,318 260,318 -15,000 -15,000 PAY GROUP P TRAINING (PIPELINE RECRUITS) 12,665 12,665 12,665 .............. .............. MOBILIZATION TRAINING 7,473 7,473 7,473 .............. .............. SCHOOL TRAINING 216,544 216,544 216,544 .............. .............. SPECIAL TRAINING 283,620 283,620 283,620 .............. .............. ADMINISTRATION AND SUPPORT 2,060,896 2,044,896 1,969,896 -91,000 -75,000 EDUCATION BENEFITS 41,063 41,063 41,063 .............. .............. HEALTH PROFESSION SCHOLARSHIP 66,834 66,834 66,834 .............. .............. OTHER PROGRAMS 62,858 62,858 62,858 .............. .............. --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 1 4,513,753 4,497,753 4,371,753 -142,000 -126,000 UNDISTRIBUTED ADJUSTMENT .............. -40,930 -29,930 -29,930 +11,000 --------------------------------------------------------------------------------- TOTAL RESERVE PERSONNEL, ARMY 4,513,753 4,456,823 4,341,823 -171,930 -115,000 -------------------------------------------------------------------------------------------------------------------------------------------------------- COMMITTEE RECOMMENDED ADJUSTMENTS The following table details the adjustments recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ 2013 budget Committee Change from Line Item estimate recommendation budget request ------------------------------------------------------------------------ BA 1: UNIT AND INDIVIDUAL TRAINING 10 Pay Group A 1,447,614 1,411,614 -36,000 Training (15 Days & Drills 24/48) Lower than .............. .............. -36,000 Budgeted Strength Levels 30 Pay Group F 275,318 260,318 -15,000 Training (Recruits) Projected .............. .............. -15,000 Underexecu tion 90 Administration 2,060,896 1,969,896 -91,000 and Support Pay and .............. .............. -91,000 Allowances -Lower than Budgeted Strength Levels UNDISTRIBUTED ADJUSTMENT Unobligated .............. -29,930 -29,930 Balances ------------------------------------------------------------------------ Reserve Personnel, Navy Appropriations, 2012.................................... $1,935,544,000 Budget estimate, 2013................................... 1,898,668,000 House allowance......................................... 1,871,688,000 Committee recommendation................................ 1,875,598,000 The Committee recommends an appropriation of $1,875,598,000. This is $23,070,000 below the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [In thousands of dollars] -------------------------------------------------------------------------------------------------------------------------------------------------------- Change from 2013 budget House Committee ------------------------------- Item estimate allowance recommendation Budget House estimate allowance -------------------------------------------------------------------------------------------------------------------------------------------------------- RESERVE PERSONNEL, NAVY ACTIVITY 1: RESERVE COMPONENT TRAINING AND SUPPORT PAY GROUP A TRAINING (15 DAYS AND DRILLS 24/48) 607,595 607,595 602,595 -5,000 -5,000 PAY GROUP B TRAINING (BACKFILL FOR ACTIVE DUTY) 9,459 9,459 9,459 .............. .............. PAY GROUP F TRAINING (RECRUITS) 51,028 51,028 51,028 .............. .............. MOBILIZATION TRAINING 9,037 9,037 9,037 .............. .............. SCHOOL TRAINING 53,791 53,791 53,791 .............. .............. SPECIAL TRAINING 96,138 96,138 96,138 .............. .............. ADMINISTRATION AND SUPPORT 1,009,599 1,009,599 1,003,399 -6,200 -6,200 EDUCATION BENEFITS 1,377 1,377 1,377 .............. .............. HEALTH PROFESSION SCHOLARSHIP 60,644 60,644 60,644 .............. .............. --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 1 1,898,668 1,898,668 1,887,468 -11,200 -11,200 UNDISTRIBUTED ADJUSTMENT .............. -26,980 -11,870 -11,870 +15,110 --------------------------------------------------------------------------------- TOTAL, RESERVE PERSONNEL, NAVY 1,898,668 1,871,688 1,875,598 -23,070 +3,910 -------------------------------------------------------------------------------------------------------------------------------------------------------- COMMITTEE RECOMMENDED ADJUSTMENTS The following table details the adjustments recommended by the Committee: [In thousands of dollars] ---------------------------------------------------------------------------------------------------------------- Change from Line Item 2013 budget Committee budget estimate recommendation estimate ---------------------------------------------------------------------------------------------------------------- BA 1: UNIT AND INDIVIDUAL TRAINING 10 Pay Group A Training (15 Days & Drills 24/48) 607,595 602,595 -5,000 Inactive Duty Training--Unjustified Growth .............. .............. -5,000 90 Administration and Support 1,009,599 1,003,399 -6,200 Prior Service Enlistment Bonuses--Excess to Require- .............. .............. -1,200 ment Officer Retention Bonuses--Excess to Requirement .............. .............. -5,000 UNDISTRIBUTED ADJUSTMENT Unobligated Balances .............. -11,870 -11,870 ---------------------------------------------------------------------------------------------------------------- Reserve Personnel, Marine Corps Appropriations, 2012.................................... $644,722,000 Budget estimate, 2013................................... 664,641,000 House allowance......................................... 651,861,000 Committee recommendation................................ 659,621,000 The Committee recommends an appropriation of $659,621,000. This is $5,020,000 below the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [In thousands of dollars] -------------------------------------------------------------------------------------------------------------------------------------------------------- Change from 2013 budget House Committee ------------------------------- Item estimate allowance recommendation Budget House estimate allowance -------------------------------------------------------------------------------------------------------------------------------------------------------- RESERVE PERSONNEL, MARINE CORPS ACTIVITY 1: RESERVE COMPONENT TRAINING AND SUPPORT PAY GROUP A TRAINING (15 DAYS AND DRILLS 24/48) 222,952 221,952 222,952 .............. +1,000 PAY GROUP B TRAINING (BACKFILL FOR ACT DUTY) 32,908 32,908 32,908 .............. .............. PAY GROUP F TRAINING (RECRUITS) 124,226 124,226 124,226 .............. .............. MOBILIZATION TRAINING 2,239 2,239 2,239 .............. .............. SCHOOL TRAINING 11,164 11,164 11,164 .............. .............. SPECIAL TRAINING 19,927 20,927 19,927 .............. -1,000 ADMINISTRATION AND SUPPORT 233,056 233,056 233,056 .............. .............. PLATOON LEADER CLASS 11,759 11,759 11,759 .............. .............. EDUCATION BENEFITS 6,410 6,410 6,410 .............. .............. --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 1 664,641 664,641 664,641 .............. .............. UNDISTRIBUTED ADJUSTMENT .............. -12,780 -5,020 -5,020 +7,760 --------------------------------------------------------------------------------- TOTAL, RESERVE PERSONNEL, MARINE CORPS 664,641 651,861 659,621 -5,020 +7,760 -------------------------------------------------------------------------------------------------------------------------------------------------------- COMMITTEE RECOMMENDED ADJUSTMENTS The following table details the adjustments recommended by the Committee: [In thousands of dollars] ---------------------------------------------------------------------------------------------------------------- Change from Item 2013 budget Committee budget estimate recommendation estimate ---------------------------------------------------------------------------------------------------------------- UNDISTRIBUTED ADJUSTMENT Unobligated Balances .............. -5,020 -5,020 ---------------------------------------------------------------------------------------------------------------- Reserve Personnel, Air Force Appropriations, 2012.................................... $1,712,705,000 Budget estimate, 2013................................... 1,741,365,000 House allowance......................................... 1,743,875,000 Committee recommendation................................ 1,728,505,000 The Committee recommends an appropriation of $1,728,505,000. This is $12,860,000 below the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [In thousands of dollars] -------------------------------------------------------------------------------------------------------------------------------------------------------- Change from 2013 budget House Committee ------------------------------- Item estimate allowance recommendation Budget House estimate allowance -------------------------------------------------------------------------------------------------------------------------------------------------------- RESERVE PERSONNEL, AIR FORCE ACTIVITY 1: RESERVE COMPONENT TRAINING AND SUPPORT PAY GROUP A TRAINING (15 DAYS AND DRILLS 24/48) 698,550 698,550 698,550 .............. .............. PAY GROUP B TRAINING (BACKFILL FOR ACTIVE DUTY) 103,514 103,514 103,514 .............. .............. PAY GROUP F TRAINING (RECRUITS) 64,919 64,919 64,919 .............. .............. PAY GROUP P TRAINING (PIPELINE RECRUITS) 50 50 50 .............. .............. MOBILIZATION TRAINING 773 773 773 .............. .............. SCHOOL TRAINING 146,738 146,738 146,738 .............. .............. SPECIAL TRAINING 277,193 277,193 277,193 .............. .............. ADMINISTRATION AND SUPPORT 372,149 372,149 350,149 -22,000 -22,000 EDUCATION BENEFITS 17,512 17,512 17,512 .............. .............. HEALTH PROFESSION SCHOLARSHIP 55,095 55,095 55,095 .............. .............. OTHER PROGRAMS (ADMINISTRATION AND SUPPORT) 4,872 4,872 4,872 .............. .............. --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 1 1,741,365 1,741,365 1,719,365 -22,000 -22,000 UNDISTRIBUTED ADJUSTMENT .............. 2,510 9,140 +9,140 +6,630 --------------------------------------------------------------------------------- TOTAL, RESERVE PERSONNEL, AIR FORCE 1,741,365 1,743,875 1,728,505 -12,860 -15,370 -------------------------------------------------------------------------------------------------------------------------------------------------------- COMMITTEE RECOMMENDED ADJUSTMENTS The following table details the adjustments recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ 2013 budget Committee Change from Line Item estimate recommendation budget request ------------------------------------------------------------------------ BA 1: UNIT AND INDIVIDUAL TRAINING 90 Administration 372,149 350,149 -22,000 and Support Full-Time .............. .............. -14,000 Pay and Allowances -Lower than Budgeted Strength Levels Reserve .............. .............. -8,000 Incentive Program--E xcess to Requiremen t UNDISTRIBUTED ADJUSTMENT Retain Air .............. 15,100 +15,100 Force Reserve Force Structure Unobligated .............. -5,960 -5,960 Balances ------------------------------------------------------------------------ National Guard Personnel, Army Appropriations, 2012.................................... $7,585,645,000 Budget estimate, 2013................................... 8,103,207,000 House allowance......................................... 8,089,477,000 Committee recommendation................................ 8,005,077,000 The Committee recommends an appropriation of $8,005,077,000. This is $98,130,000 below the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [In thousands of dollars] -------------------------------------------------------------------------------------------------------------------------------------------------------- Change from 2013 budget House Committee ------------------------------- Item estimate allowance recommendation Budget House estimate allowance -------------------------------------------------------------------------------------------------------------------------------------------------------- NATIONAL GUARD PERSONNEL, ARMY ACTIVITY 1: RESERVE COMPONENT TRAINING AND SUPPORT PAY GROUP A TRAINING (15 DAYS AND DRILLS 24/48) 2,446,262 2,485,762 2,446,262 .............. -39,500 PAY GROUP F TRAINING (RECRUITS) 623,345 623,345 623,345 .............. .............. PAY GROUP P TRAINING (PIPELINE RECRUITS) 29,528 29,528 24,128 -5,400 -5,400 SCHOOL TRAINING 500,423 500,423 500,423 .............. .............. SPECIAL TRAINING 536,856 536,856 536,856 .............. .............. ADMINISTRATION AND SUPPORT 3,855,110 3,815,610 3,792,110 -63,000 -23,500 EDUCATION BENEFITS 111,683 111,683 95,683 -16,000 -16,000 --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 1 8,103,207 8,103,207 8,018,807 -84,400 -84,400 UNDISTRIBUTED ADJUSTMENT .............. -13,730 -13,730 -13,730 .............. --------------------------------------------------------------------------------- TOTAL, NATIONAL GUARD PERSONNEL, ARMY 8,103,207 8,089,477 8,005,077 -98,130 -84,400 -------------------------------------------------------------------------------------------------------------------------------------------------------- COMMITTEE RECOMMENDED ADJUSTMENTS The following table details the adjustments recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ 2013 budget Committee Change from Line Item estimate recommendation budget request ------------------------------------------------------------------------ BA1: UNIT AND INDIVIDUAL TRAINING 40 Pay Group P 29,528 24,128 -5,400 Training (Pipeline Recruits) Individual .............. .............. -5,400 Clothing and Uniform Allowance- -Excess to Requiremen t 90 Administration 3,855,110 3,792,110 -63,000 and Support Full-Time .............. .............. -63,000 Pay and Allowances -Army Guard Identified Excess to Requiremen t 100 Education 111,683 95,683 -16,000 Benefits Excess to .............. .............. -16,000 Requiremen t UNDISTRIBUTED ADJUSTMENT Unobligated .............. -13,730 -13,730 Balances ------------------------------------------------------------------------ National Guard Personnel, Air Force Appropriations, 2012.................................... $3,088,929,000 Budget estimate, 2013................................... 3,110,065,000 House allowance......................................... 3,158,015,000 Committee recommendation................................ 3,161,765,000 The Committee recommends an appropriation of $3,161,765,000. This is $51,700,000 above the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [In thousands of dollars] -------------------------------------------------------------------------------------------------------------------------------------------------------- Change from 2013 budget House Committee ------------------------------- Item estimate allowance recommendation Budget House estimate allowance -------------------------------------------------------------------------------------------------------------------------------------------------------- NATIONAL GUARD PERSONNEL, AIR FORCE ACTIVITY 1: RESERVE COMPONENT TRAINING AND SUPPORT PAY GROUP A TRAINING (15 DAYS AND DRILLS 24/48) 910,733 910,733 885,733 -25,000 -25,000 PAY GROUP F TRAINING (RECRUITS) 122,985 122,985 122,985 .............. .............. PAY GROUP P TRAINING (PIPELINE RECRUITS) 4,811 4,811 4,811 .............. .............. SCHOOL TRAINING 245,857 245,857 245,857 .............. .............. SPECIAL TRAINING 142,591 142,591 142,591 .............. .............. ADMINISTRATION AND SUPPORT 1,648,453 1,641,953 1,648,453 .............. +6,500 EDUCATION BENEFITS 34,635 34,635 34,635 .............. .............. --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 1 3,110,065 3,103,565 3,085,065 -25,000 -18,500 UNDISTRIBUTED ADJUSTMENT .............. 54,450 76,700 +76,700 +22,250 --------------------------------------------------------------------------------- TOTAL, NATIONAL GUARD PERSONNEL, AIR FORCE 3,110,065 3,158,015 3,161,765 +51,700 +3,750 -------------------------------------------------------------------------------------------------------------------------------------------------------- COMMITTEE RECOMMENDED ADJUSTMENTS The following table details the adjustments recommended by the Committee: [In thousands of dollars] ---------------------------------------------------------------------------------------------------------------- 2013 budget Committee Change from Line Item estimate recommendation budget request ---------------------------------------------------------------------------------------------------------------- BA 1: UNIT AND INDIVIDUAL TRAINING 10 Pay Group A Training (15 Days & Drills 24/48) 910,733 885,733 -25,000 Active Duty for Training--Projected Under- ............... ............... -17,000 execution Inactive Duty Training--Projected Underexecution ............... ............... -3,000 Clothing Allowances--Excess to Requirement ............... ............... -5,000 UNDISTRIBUTED ADJUSTMENT Retain Air National Guard Force Structure ............... 76,700 +76,700 ---------------------------------------------------------------------------------------------------------------- TITLE II OPERATION AND MAINTENANCE Funds appropriated under this title provide the resources required to prepare for and conduct combat operations and other peace time missions. These funds are used to purchase fuel and spare parts for training operations, pay supporting civilian personnel, and purchase supplies, equipment, and service contracts for the repair of weapons and facilities. The President's fiscal year 2013 budget requests a total of $174,938,933,000 for operation and maintenance appropriations. SUMMARY OF COMMITTEE ACTION The Committee recommends operation and maintenance appropriations totaling $170,785,490,000 for fiscal year 2013. This is $4,153,443,000 below the budget estimate. Committee recommended operation and maintenance appropriations for fiscal year 2013 are summarized below: SUMMARY OF OPERATION AND MAINTENANCE APPROPRIATIONS [In thousands of dollars] ---------------------------------------------------------------------------------------------------------------- Change from Account 2013 budget Committee budget estimate recommendation estimate ---------------------------------------------------------------------------------------------------------------- Operation and Maintenance: Operation and Maintenance, Army............................. 36,608,592 33,804,145 -2,804,447 Operation and Maintenance, Navy............................. 41,606,943 40,479,556 -1,127,387 Operation and Maintenance, Marine Corps..................... 5,983,163 5,894,963 -88,200 Operation and Maintenance, Air Force........................ 35,435,360 34,983,793 -451,567 Operation and Maintenance, Defense-Wide..................... 31,993,013 31,331,839 -661,174 Operation and Maintenance, Army Reserve..................... 3,162,008 3,140,508 -21,500 Operation and Maintenance, Navy Reserve..................... 1,246,982 1,246,982 .............. Operation and Maintenance, Marine Corps Reserve............. 272,285 272,285 .............. Operation and Maintenance, Air Force Reserve................ 3,166,482 3,227,382 +60,900 Operation and Maintenance, Army National Guard.............. 7,108,612 7,075,042 -33,570 Operation and Maintenance, Air National Guard............... 6,015,455 6,493,155 +477,700 United States Court of Appeals for the Armed Forces......... 13,516 13,516 .............. Environmental Restoration, Army............................. 335,921 335,921 .............. Environmental Restoration, Navy............................. 310,594 310,594 .............. Environmental Restoration, Air Force........................ 529,263 529,263 .............. Environmental Restoration, Defense-Wide..................... 11,133 11,133 .............. Environmental Restoration, Formerly Used Defense Sites...... 237,543 287,543 +50,000 Overseas Humanitarian, Disaster and Civic Aid............... 108,759 108,759 .............. Cooperative Threat Reduction Account........................ 519,111 519,111 .............. Department of Defense Acquisition Workforce Development Fund 274,198 720,000 +445,802 ----------------------------------------------- Total..................................................... 174,938,933 170,785,490 -4,153,443 ---------------------------------------------------------------------------------------------------------------- OPERATION AND MAINTENANCE OVERVIEW Joint Strike Fighter [JSF] Sustainment Costs.--The fiscal year 2013 budget request includes $302,400,000 for operations and sustainment of up to 66 production aircraft. The Committee is concerned with the overall total ownership cost, noting that operations and sustainment generally ranges from 60-70 percent of a program's total cost. The Committee notes that in the December 2011 Selected Acquisition Report [SAR] the total JSF operations and sustainment cost increased over 10 percent from $1,113,200,000,000 to $1,221,100,000,000 as compared to the previous SAR. According to a March 2012 Government Accountability Office report, ``effectively managing software and the global supply chain is critical to improving program outcomes.'' In order to better understand the management of these critical areas, the Committee directs the Secretary of Defense to report to the congressional defense committees no later than 180 days after enactment of this act on the following: (1) a comprehensive review of sustaining the engineering workforce to include identifying efficiencies (such as creating a software engineering task force similar to the F/ A-18 program); (2) a comprehensive review of the supply chain management construct, to include identifying areas within supply chain management that are cost drivers; (3) a sustainment affordability model with cost objectives that drive costs downward; and (4) a list of the top five cost drivers and top five risk areas in operations and sustainment. Operation and Maintenance, Army Appropriations, 2012.................................... $31,072,902,000 Budget estimate, 2013................................... 36,608,592,000 House allowance......................................... 36,422,738,000 Committee recommendation................................ 33,804,145,000 The Committee recommends an appropriation of $33,804,145,000. This is $2,804,447,000 below the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [In thousands of dollars] -------------------------------------------------------------------------------------------------------------------------------------------------------- Change from 2013 budget House Committee ------------------------------- Item estimate allowance recommendation Budget House estimate allowance -------------------------------------------------------------------------------------------------------------------------------------------------------- OPERATION AND MAINTENANCE, ARMY BUDGET ACTIVITY 1: OPERATING FORCES LAND FORCES MANEUVER UNITS 1,223,087 1,055,242 857,517 -365,570 -197,725 MODULAR SUPPORT BRIGADES 80,574 67,902 80,574 .............. +12,672 ECHELONS ABOVE BRIGADES 723,039 620,651 648,187 -74,852 +27,536 THEATER LEVEL ASSETS 706,974 620,666 688,889 -18,085 +68,223 LAND FORCES OPERATIONS SUPPORT 1,226,650 1,086,855 1,084,853 -141,797 -2,002 AVIATION ASSETS 1,319,832 1,297,479 1,258,327 -61,505 -39,152 LAND FORCES READINESS FORCE READINESS OPERATIONS SUPPORT 3,447,174 3,183,178 3,147,285 -299,889 -35,893 LAND FORCES SYSTEMS READINESS 454,774 454,774 454,774 .............. .............. LAND FORCES DEPOT MAINTENANCE 1,762,757 1,762,757 628,155 -1,134,602 -1,134,602 LAND FORCES READINESS SUPPORT BASE OPERATIONS SUPPORT 7,401,613 7,924,423 7,034,366 -367,247 -890,057 FACILITIES SUSTAINMENT, RESTORATION, & MODERNIZATION 3,041,074 3,295,481 3,041,074 .............. -254,407 MANAGEMENT AND OPERATIONAL HEADQUARTERS 410,171 410,171 410,171 .............. .............. COMBATANT COMMANDER'S CORE OPERATIONS 177,819 177,819 177,819 .............. .............. COMBATANT COMMANDERS ANCILLARY MISSIONS 461,333 461,333 461,333 .............. .............. --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 1 22,436,871 22,418,731 19,973,324 -2,463,547 -2,445,407 BUDGET ACTIVITY 2: MOBILIZATION MOBILITY OPERATIONS STRATEGIC MOBILITY 405,496 405,496 405,496 .............. .............. ARMY PREPOSITIONED STOCKS 195,349 195,349 195,349 .............. .............. INDUSTRIAL PREPAREDNESS 6,379 6,379 6,379 .............. .............. --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 2 607,224 607,224 607,224 .............. .............. BUDGET ACTIVITY 3: TRAINING AND RECRUITING ACCESSION TRAINING OFFICER ACQUISITION 112,866 112,866 112,866 .............. .............. RECRUIT TRAINING 73,265 73,265 73,265 .............. .............. ONE STATION UNIT TRAINING 51,227 51,227 51,227 .............. .............. SENIOR RESERVE OFFICERS TRAINING CORPS 443,306 481,306 443,306 .............. -38,000 BASIC SKILL AND ADVANCED TRAINING SPECIALIZED SKILL TRAINING 1,099,556 1,099,556 1,079,556 -20,000 -20,000 FLIGHT TRAINING 1,130,627 1,130,627 1,130,627 .............. .............. PROFESSIONAL DEVELOPMENT EDUCATION 191,683 191,683 191,683 .............. .............. TRAINING SUPPORT 652,095 652,095 652,095 .............. .............. RECRUITING AND OTHER TRAINING AND EDUCATION RECRUITING AND ADVERTISING 507,510 507,510 507,510 .............. .............. EXAMINING 156,964 156,964 156,964 .............. .............. OFF-DUTY AND VOLUNTARY EDUCATION 244,343 244,343 244,343 .............. .............. CIVILIAN EDUCATION AND TRAINING 212,477 212,477 203,477 -9,000 -9,000 JUNIOR RESERVE OFFICERS TRAINING CORPS 182,691 182,691 182,691 .............. .............. --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 3 5,058,610 5,096,610 5,029,610 -29,000 -67,000 BUDGET ACTIVITY 4: ADMIN & SERVICEWIDE ACTIVITIES LOGISTICS OPERATIONS SERVICEWIDE TRANSPORTATION 601,331 601,331 601,331 .............. .............. CENTRAL SUPPLY ACTIVITIES 741,324 741,324 741,324 .............. .............. LOGISTICS SUPPORT ACTIVITIES 610,136 610,136 610,136 .............. .............. AMMUNITION MANAGEMENT 478,707 478,707 478,707 .............. .............. SERVICEWIDE SUPPORT ADMINISTRATION 556,307 556,307 556,307 .............. .............. SERVICEWIDE COMMUNICATIONS 1,547,925 1,495,880 1,542,925 -5,000 +47,045 MANPOWER MANAGEMENT 362,205 313,953 338,205 -24,000 +24,252 OTHER PERSONNEL SUPPORT 220,754 220,754 220,754 .............. .............. OTHER SERVICE SUPPORT 1,153,556 1,158,456 1,148,656 -4,900 -9,800 ARMY CLAIMS ACTIVITIES 250,970 240,970 250,970 .............. +10,000 REAL ESTATE MANAGEMENT 222,351 222,351 211,351 -11,000 -11,000 BASE OPERATIONS SUPPORT 222,379 222,379 222,379 .............. .............. SUPPORT OF OTHER NATIONS SUPPORT OF NATO OPERATIONS 459,710 459,393 459,710 .............. +317 MISC. SUPPORT OF OTHER NATIONS 25,637 25,637 25,637 .............. .............. OTHER PROGRAMS OTHER PROGRAMS 1,052,595 1,052,595 1,062,195 +9,600 +9,600 --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 4 8,505,887 8,400,173 8,470,587 -35,300 +70,414 INVENTORY OF SPARE PARTS AND SECONDARY ITEMS .............. -100,000 .............. .............. +100,000 CIVILIAN PERSONNEL COMPENSATION .............. .............. -34,000 -34,000 -34,000 EXCESS WORKING CAPITAL FUND CARRYOVER .............. .............. -146,600 -146,600 -146,600 TRANSFER TO OPERATION AND MAINTENANCE, NAVY .............. .............. -27,000 -27,000 -27,000 TRANSFER TO RESEARCH, DEVELOPMENT, TEST AND EVALUATION ARMY .............. .............. -22,000 -22,000 -22,000 IT CONTRACT SUPPORT GROWTH .............. .............. -47,000 -47,000 -47,000 ================================================================================= TOTAL, OPERATION AND MAINTENANCE, ARMY 36,608,592 36,422,738 33,804,145 -2,804,447 -2,618,593 -------------------------------------------------------------------------------------------------------------------------------------------------------- COMMITTEE RECOMMENDED ADJUSTMENTS The following table details the adjustments recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ 111 MANEUVER UNITS 1,223,087 857,517 -365,570 Transfer to .............. .............. -217,376 Title IX: Combined Arms Training Strategy Transfer to .............. .............. -148,194 Title IX: Theater Demand Reduction 113 ECHELONS ABOVE 723,039 648,187 -74,852 BRIGADE Transfer to .............. .............. -74,852 Title IX: Combined Arms Training Strategy 114 THEATER LEVEL 706,974 688,889 -18,085 ASSETS Army- .............. .............. -18,085 Identified Excess for Balkans Mission Contract Support 115 LAND FORCES 1,226,650 1,084,853 -141,797 OPERATIONS SUPPORT Transfer to .............. .............. -141,797 Title IX: Combat Training Centers 116 AVIATION ASSETS 1,319,832 1,258,327 -61,505 Transfer to .............. .............. -61,505 Title IX: Theater Demand Reduction 121 FORCE READINESS 3,447,174 3,147,285 -299,889 OPERATIONS SUPPORT Transfer to .............. .............. -71,660 Title IX: Body Armor Sustainmen t Transfer to .............. .............. -228,229 Title IX: Forward Operating Base--Kuwa it 123 LAND FORCES 1,762,757 628,155 -1,134,602 DEPOT MAINTENANCE Transfer to .............. .............. -150,483 Title IX: Depot Maintenanc e--Aviatio n Transfer to .............. .............. -203,560 Title IX: Depot Maintenanc e--Communi cations Electronic s Transfer to .............. .............. -102,707 Title IX: Depot Maintenanc e--General Purpose Transfer to .............. .............. -161,174 Title IX: Depot Maintenanc e--Missile s Transfer to .............. .............. -516,678 Title IX: Depot Maintenanc e--Post Production Software Support [PPSS] 131 BASE OPERATIONS 7,401,613 7,034,366 -367,247 SUPPORT Removal of .............. .............. -101,247 One-Time Fiscal Year 2012 Costs for Base Operations Programs Army- .............. .............. -52,000 Requested Transfer to Other Procuremen t, Army Line 61A: Emergency Management Modernizat ion Program Budget .............. .............. -29,000 Justificat ion Does Not Match Summary of Price and Program Changes for the Building Maintenanc e Fund Environment .............. .............. +15,000 al Conservati on for Ranges to Address Shortfalls Transfer to .............. .............. -200,000 Title IX: Overseas Security Guards 321 SPECIALIZED 1,099,556 1,079,556 -20,000 SKILL TRAINING Program .............. .............. -20,000 Decreases for TRADOC Centers of Excellence and Joint Service Schools Not Properly Accounted for in Budget Justificat ion 331 RECRUITING AND 507,510 507,510 .............. ADVERTISING Active Army .............. .............. -2,300 NASCAR Sponsorshi p Costs Eliminated for Fiscal Year 2013 Transfer .............. .............. +2,300 Funds to Increase Online Presence for Recruiting and Advertisin g Efforts 334 CIVILIAN 212,477 203,477 -9,000 EDUCATION AND TRAINING Training .............. .............. -9,000 Load Decreases Not Properly Accounted for in Budget Justificat ion 411 SECURITY 1,052,595 1,062,195 +9,600 PROGRAMS Classified .............. .............. +9,600 Adjustment 432 SERVICEWIDE 1,547,925 1,542,925 -5,000 COMMUNICATIONS Duplicate .............. .............. -5,000 Request for Pricing Adjustment for Defense Informatio n Systems Agency [DISA] 433 MANPOWER 362,205 338,205 -24,000 MANAGEMENT Army- .............. .............. -24,000 Identified Excess for Civilian Personnel Resources Support 435 OTHER SERVICE 1,153,556 1,148,656 -4,900 SUPPORT Removal of .............. .............. -4,900 One-Time Fiscal Year 2012 Increase 437 REAL ESTATE 222,351 211,351 -11,000 MANAGEMENT Budget .............. .............. -11,000 Justificat ion Does Not Match Summary of Price and Program Changes for the Pentagon Reservatio n Maintenanc e Revolving Fund UNDIST Army-Identified .............. .............. -34,000 Excess for Civilian Personnel Compensa- tion UNDIST Excess Working .............. .............. -146,600 Capital Fund Carry Over UNDIST Transfer to .............. .............. -27,000 Operation and Maintenance, Navy for Joint High Speed Vessel Costs Not Properly Accounted for in Budget Justification UNDIST Transfers to .............. .............. -22,000 Research, Development, Test and Evaluation, Army Not Properly Accounted for in Budget Justification UNDIST Budget .............. .............. -47,000 Justification Does Not Match Summary of Price and Program Changes for IT Contract Support Growth ------------------------------------------------------------------------ Arlington National Cemetery.--The budget request proposes to fund Arlington National Cemetery through three separate accounts contained in two different appropriations bills for fiscal year 2013. Although the Committee does not support this approach, the efforts to correct issues at Arlington National Cemetery are of utmost importance. Therefore, the Committee provides authority to spend up to $25,000,000 from within the funds appropriated for Operation and Maintenance, Army. This authority is provided for fiscal year 2013 only. The Committee will not support future requests for Arlington National Cemetery in the Defense appropriations bill and directs that future funding requests be contained in the Department of Defense, Cemeterial Expenses, Army account, which is funded in the Military Construction, Veterans Affairs, and Related Agencies appropriations bill. Fire-Resistant Equipment.--The Committee remains concerned that deployed forces face excessive risk of burns from exposure to improvised explosive devices and other threats. While the Committee commends the Army for providing its vehicle crews with a comprehensive fire-resistant clothing ensemble, the Committee believes that proven fire-resistant protection for extremities, particularly protection for soldiers' feet in the form of durable, comfortable, and fire-resistant boot socks, should be provided to every soldier, including dismounted soldiers. The Committee encourages the Army to consider expanding its requirement for fire-resistant boot socks from only mounted soldiers to include dismounted soldiers as well. Operation and Maintenance, Navy Appropriations, 2012.................................... $38,120,821,000 Budget estimate, 2013................................... 41,606,943,000 House allowance......................................... 41,463,773,000 Committee recommendation................................ 40,479,556,000 The Committee recommends an appropriation of $40,479,556,000. This is $1,127,387,000 below the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [In thousands of dollars] -------------------------------------------------------------------------------------------------------------------------------------------------------- Change from 2013 budget House Committee ------------------------------- Item estimate allowance recommendation Budget House estimate allowance -------------------------------------------------------------------------------------------------------------------------------------------------------- OPERATION AND MAINTENANCE, NAVY BUDGET ACTIVITY 1: OPERATING FORCES AIR OPERATIONS MISSION AND OTHER FLIGHT OPERATIONS 4,918,144 4,927,144 4,737,199 -180,945 -189,945 FLEET AIR TRAINING 1,886,825 1,886,825 1,847,825 -39,000 -39,000 AVIATION TECHNICAL DATA AND ENGINEERING SERVICES 44,032 44,032 44,032 .............. .............. AIR OPERATIONS AND SAFETY SUPPORT 101,565 101,565 101,565 .............. .............. AIR SYSTEMS SUPPORT 374,827 374,827 374,827 .............. .............. AIRCRAFT DEPOT MAINTENANCE 960,802 960,802 960,802 .............. .............. AIRCRAFT DEPOT OPERATIONS SUPPORT 37,545 37,545 37,545 .............. .............. AVIATION LOGISTICS 328,805 328,805 328,805 .............. .............. SHIP OPERATIONS MISSION AND OTHER SHIP OPERATIONS 4,686,535 4,711,235 4,181,715 -504,820 -529,520 SHIP OPERATIONS SUPPORT AND TRAINING 769,204 769,204 769,204 .............. .............. SHIP DEPOT MAINTENANCE 5,089,981 5,157,981 5,239,981 +150,000 +82,000 SHIP DEPOT OPERATIONS SUPPORT 1,315,366 1,318,385 1,315,366 .............. -3,019 COMBAT COMMUNICATIONS/SUPPORT COMBAT COMMUNICATIONS 619,909 619,909 619,909 .............. .............. ELECTRONIC WARFARE 92,364 92,364 92,364 .............. .............. SPACE SYSTEMS AND SURVEILLANCE 174,437 174,437 174,437 .............. .............. WARFARE TACTICS 441,035 441,035 441,035 .............. .............. OPERATIONAL METEOROLOGY AND OCEANOGRAPHY 333,554 333,554 333,554 .............. .............. COMBAT SUPPORT FORCES 910,087 910,087 717,286 -192,801 -192,801 EQUIPMENT MAINTENANCE 167,158 167,158 167,158 .............. .............. DEPOT OPERATIONS SUPPORT 4,183 4,183 4,183 .............. .............. COMBATANT COMMANDERS CORE OPERATIONS 95,528 95,528 95,528 .............. .............. COMBATANT COMMANDERS DIRECT MISSION SUPPORT 204,569 204,569 204,569 .............. .............. WEAPONS SUPPORT CRUISE MISSILE 111,884 111,884 111,884 .............. .............. FLEET BALLISTIC MISSILE 1,181,038 1,181,038 1,181,038 .............. .............. IN-SERVICE WEAPONS SYSTEMS SUPPORT 87,606 87,606 87,606 .............. .............. WEAPONS MAINTENANCE 519,583 539,583 519,583 .............. -20,000 OTHER WEAPON SYSTEMS SUPPORT 300,435 300,435 300,435 .............. .............. BASE SUPPORT ENTERPRISE INFORMATION TECHNOLOGY 1,077,924 1,077,924 1,069,924 -8,000 -8,000 FACILITIES SUSTAINMENT, RESTORATION & MODERNIZATION 2,101,279 2,311,407 2,082,106 -19,173 -229,301 BASE OPERATING SUPPORT 4,822,093 4,822,093 4,656,818 -165,275 -165,275 --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 1 33,758,297 34,093,144 32,798,283 -960,014 -1,294,861 BUDGET ACTIVITY 2: MOBILIZATION READY RESERVE AND PREPOSITIONING FORCES SHIP PREPOSITIONING AND SURGE 334,659 334,659 334,659 .............. .............. ACTIVATIONS/INACTIVATIONS AIRCRAFT ACTIVATIONS/INACTIVATIONS 6,562 6,562 6,562 .............. .............. SHIP ACTIVATIONS/INACTIVATIONS 1,066,329 587,329 1,053,783 -12,546 +466,454 MOBILIZATION PREPAREDNESS FLEET HOSPITAL PROGRAM 83,901 83,901 80,413 -3,488 -3,488 INDUSTRIAL READINESS 2,695 2,695 2,695 .............. .............. COAST GUARD SUPPORT 23,502 23,502 23,502 .............. .............. --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 2 1,517,648 1,038,648 1,501,614 -16,034 +462,966 BUDGET ACTIVITY 3: TRAINING AND RECRUITING ACCESSION TRAINING OFFICER ACQUISITION 147,807 147,807 147,807 .............. .............. RECRUIT TRAINING 10,473 10,473 10,473 .............. .............. RESERVE OFFICERS TRAINING CORPS 139,220 139,220 139,220 .............. .............. BASIC SKILLS AND ADVANCED TRAINING SPECIALIZED SKILL TRAINING 582,177 582,177 582,177 .............. .............. FLIGHT TRAINING 5,456 5,456 5,456 .............. .............. PROFESSIONAL DEVELOPMENT EDUCATION 170,746 170,746 170,746 .............. .............. TRAINING SUPPORT 153,403 153,403 153,403 .............. .............. RECRUITING, AND OTHER TRAINING AND EDUCATION RECRUITING AND ADVERTISING 241,329 242,312 242,366 +1,037 +54 OFF-DUTY AND VOLUNTARY EDUCATION 108,226 108,226 108,226 .............. .............. CIVILIAN EDUCATION AND TRAINING 105,776 105,776 105,776 .............. .............. JUNIOR ROTC 51,817 51,817 51,817 .............. .............. --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 3 1,716,430 1,717,413 1,717,467 +1,037 +54 BUDGET ACTIVITY 4: ADMIN & SERVICEWIDE ACTIVITIES SERVICEWIDE SUPPORT ADMINISTRATION 797,177 797,177 797,177 .............. .............. EXTERNAL RELATIONS 12,872 12,872 12,872 .............. .............. CIVILIAN MANPOWER AND PERSONNEL MANAGEMENT 120,181 120,181 120,181 .............. .............. MILITARY MANPOWER AND PERSONNEL MANAGEMENT 235,753 235,753 207,242 -28,511 -28,511 OTHER PERSONNEL SUPPORT 263,060 263,060 263,060 .............. .............. SERVICEWIDE COMMUNICATIONS 363,213 363,213 363,213 .............. .............. LOGISTICS OPERATIONS AND TECHNICAL SUPPORT SERVICEWIDE TRANSPORTATION 182,343 182,343 182,343 .............. .............. PLANNING, ENGINEERING AND DESIGN 282,464 282,464 282,464 .............. .............. ACQUISITION AND PROGRAM MANAGEMENT 1,092,123 1,092,123 1,085,258 -6,865 -6,865 HULL, MECHANICAL AND ELECTRICAL SUPPORT 53,560 53,560 53,560 .............. .............. COMBAT/WEAPONS SYSTEMS 25,299 25,299 25,299 .............. .............. SPACE AND ELECTRONIC WARFARE SYSTEMS 64,418 64,418 64,418 .............. .............. SECURITY PROGRAMS NAVAL INVESTIGATIVE SERVICE 580,042 580,042 580,042 .............. .............. SUPPORT OF OTHER NATIONS INTERNATIONAL HEADQUARTERS AND AGENCIES 4,984 4,984 4,984 .............. .............. OTHER PROGRAMS OTHER PROGRAMS 537,079 537,079 540,979 +3,900 +3,900 --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 4 4,614,568 4,614,568 4,583,092 -31,476 -31,476 EXCESS WORKING CAPITAL FUND CARRYOVER .............. .............. -120,900 -120,900 -120,900 ================================================================================= TOTAL, OPERATION AND MAINTENANCE, NAVY 41,606,943 41,463,773 40,479,556 -1,127,387 -984,217 -------------------------------------------------------------------------------------------------------------------------------------------------------- COMMITTEE RECOMMENDED ADJUSTMENTS The following table details the adjustments recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ 1A1A MISSION AND 4,918,144 4,737,199 -180,945 OTHER FLIGHT OPERATIONS Transfer to .............. .............. -180,945 Title IX: Flying Hours 1A2A FLEET AIR 1,886,825 1,847,825 -39,000 TRAINING Decrease .............. .............. -39,000 for Marine Corps F/A- 18 Flight Training Requiremen ts Not Properly Accounted For in Budget Justificat ion 1B1B MISSION AND 4,686,535 4,181,715 -504,820 OTHER SHIP OPERATIONS Transfer to .............. .............. -504,820 Title IX: Ship Consumable s, Repair Parts, Fuel, Administra tion 1B4B SHIP DEPOT 5,089,981 5,239,981 +150,000 MAINTENANCE Navy- .............. .............. +150,000 Identified Shortfall to Repair USS MIAMI 1C6C COMBAT SUPPORT 910,087 717,286 -192,801 FORCES Transfer to .............. .............. -192,801 Title IX: Naval Expedition ary Combat Command Increases BSIT ENTERPRISE 1,077,924 1,069,924 -8,000 INFORMATION Reduced .............. .............. -8,000 Requiremen t for OCONUS Navy Enterprise Network (ONE-Net) Not Properly Accounted for in Budget Justificat ion BSM1 SUSTAINMENT, 2,101,279 2,082,106 -19,173 RESTORATION, AND MODERNIZATION Transfer to .............. .............. -19,173 Title IX: Camp Lemonnier, Djibouti BSS1 BASE OPERATING 4,822,093 4,656,818 -165,275 SUPPORT Unjustified .............. .............. -7,000 Growth for Costs at Guantanamo Bay Environment .............. .............. +15,000 al Conservati on for Ranges to Address Shortfalls Transfer to .............. .............. -173,275 Title IX: Camp Lemonnier, Djibouti 2B2G SHIP 1,066,329 1,053,783 -12,546 ACTIVATIONS/ INACTIVATIONS Retain Four .............. .............. -12,546 Cruisers 2C1H FLEET HOSPITAL 83,901 80,413 -3,488 PROGRAM Transfer to .............. .............. -3,488 Title IX: Camp Lemonnier, Djibouti 3C1L RECRUITING AND 241,329 242,366 +1,037 ADVERTISING Naval Sea .............. .............. +1,037 Cadet Corps 4A4M MILITARY 235,753 207,242 -28,511 MANPOWER AND PERSONNEL MANAGEMENT Transfer to .............. .............. -28,511 Title IX: Camp Lemonnier, Djibouti 4B3N ACQUISITION AND 1,092,123 1,085,258 -6,865 PROGRAM MANAGEMENT Transfer to .............. .............. -6,865 Title IX: Camp Lemonnier, Djibouti OTHER PROGRAMS 537,079 540,979 +3,900 Classified .............. .............. +3,900 Adjustment UNDIST Excess Working .............. .............. -120,900 Capital Fund Carry Over ------------------------------------------------------------------------ USS Miami.--Subsequent to the fiscal year 2013 budget submission, the USS Miami experienced fire damage during a regularly scheduled maintenance availability. The Committee recommends an additional $150,000,000 only for repairs to the USS Miami and directs that none of those funds may be obligated or expended until 30 days after the Secretary of the Navy provides to the congressional defense committees an updated damage assessment, the Navy's proposed plan for the USS Miami and an updated cost estimate. Naval Shipyard Apprentice Program.--The Committee directs that during fiscal year 2013 the Navy shall induct classes of no fewer than 100 apprentices, respectively, at each of the naval shipyards. The Committee further directs the Navy to include the costs of the fiscal year 2014 class of apprentices in its budget request. U.S. Coast Guard.--The Committee is aware that Department of Defense [DOD] regulations currently restrict DOD mission appropriated funded activities from offering reimbursable rates to non-DOD agencies. This restriction forces the Navy to charge the U.S. Coast Guard fully burdened rates for drydocking services at Navy shipyards rather than reimbursable rates. Therefore, the Committee directs that funds appropriated under Operation and Maintenance, Navy may be used to pay overhead costs incurred by a Naval Shipyard when drydocking U.S. Coast Guard ships. Defense Support to Civil Authorities.--Navy Emergency Preparedness Liaison Officers [NEPLOs] serve as senior Navy representatives for Defense Support to Civil Authorities during emergencies and events of national significance such as hurricanes, forest fires, flooding, and earthquakes. These officers depend heavily on an ability to communicate rapidly with service and interagency partners and to maintain an accurate common operating picture that facilitates response efforts. The Committee encourages the Department of Defense to consider improvements to readiness management, information sharing, communications, and situational awareness tools and technologies in support of NEPLO and similar programs that provide Defense Support to Civil Authorities during emergencies and events of national significance. Tank Corrosion Monitoring System.--The Committee encourages the Navy to pursue maintenance cost savings by expanding its camera and automated corrosion detection technology acquisition program from the LPD-17 and DDG-1000 class of ships to include the LSD-41, LSD-49, and LHD-1 class of ships. Operation and Maintenance, Marine Corps Appropriations, 2012.................................... $5,542,937,000 Budget estimate, 2013................................... 5,983,163,000 House allowance......................................... 6,075,667,000 Committee recommendation................................ 5,894,963,000 The Committee recommends an appropriation of $5,894,963,000. This is $88,200,000 below the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [In thousands of dollars] -------------------------------------------------------------------------------------------------------------------------------------------------------- Change from 2013 budget House Committee ------------------------------- Item estimate allowance recommendation Budget House estimate allowance -------------------------------------------------------------------------------------------------------------------------------------------------------- OPERATION AND MAINTENANCE, MARINE CORPS BUDGET ACTIVITY 1: OPERATING FORCES EXPEDITIONARY FORCES OPERATIONAL FORCES 788,055 788,055 842,455 +54,400 +54,400 FIELD LOGISTICS 762,614 762,614 762,614 .............. .............. DEPOT MAINTENANCE 168,447 168,447 56,447 -112,000 -112,000 USMC PREPOSITIONING MARITIME PREPOSITIONING 100,374 100,374 100,374 .............. .............. FACILITIES SUSTAINMENT, RESTORATION & MODERNIZATION 825,039 907,543 825,039 .............. -82,504 BASE OPERATING SUPPORT 2,188,883 2,188,883 2,190,083 +1,200 +1,200 --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 1 4,833,412 4,915,916 4,777,012 -56,400 -138,904 BUDGET ACTIVITY 3: TRAINING AND RECRUITING ACCESSION TRAINING RECRUIT TRAINING 18,251 18,251 18,251 .............. .............. OFFICER ACQUISITION 869 869 869 .............. .............. BASIC SKILLS AND ADVANCED TRAINING SPECIALIZED SKILLS TRAINING 80,914 80,914 80,914 .............. .............. PROFESSIONAL DEVELOPMENT EDUCATION 42,744 42,744 42,744 .............. .............. TRAINING SUPPORT 292,150 292,150 292,150 .............. .............. RECRUITING AND OTHER TRAINING EDUCATION RECRUITING AND ADVERTISING 168,609 178,609 178,609 +10,000 .............. OFF-DUTY AND VOLUNTARY EDUCATION 56,865 56,865 56,865 .............. .............. JUNIOR ROTC 19,912 19,912 19,912 .............. .............. --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 3 680,314 690,314 690,314 +10,000 .............. BUDGET ACTIVITY 4: ADMIN & SERVICEWIDE ACTIVITIES SERVICEWIDE SUPPORT SERVICEWIDE TRANSPORTATION 39,962 39,962 39,962 .............. .............. ACQUISITION AND PROGRAM MANAGEMENT 83,404 83,404 83,404 .............. .............. --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 4 123,366 123,366 123,366 .............. .............. OTHER PROGRAMS OTHER PROGRAMS 346,071 346,071 341,071 -5,000 -5,000 CIVILIAN PERSONNEL COMPENSATION .............. .............. -30,000 -30,000 -30,000 EXCESS WORKING CAPITAL FUND CARRYOVER .............. .............. -6,800 -6,800 -6,800 ================================================================================= TOTAL, OPERATION AND MAINTENANCE, MARINE CORPS 5,983,163 6,075,667 5,894,963 -88,200 -180,704 -------------------------------------------------------------------------------------------------------------------------------------------------------- COMMITTEE RECOMMENDED ADJUSTMENTS The following table details the adjustments recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ 1A1A OPERATIONAL 788,055 842,455 +54,400 FORCES Civilian .............. .............. -10,600 Personnel Realignmen t Requested as Program Growth Marine .............. .............. +65,000 Corps--Ide ntified Shortfall for Unit Deployment Program 1A3A DEPOT 168,447 56,447 -112,000 MAINTENANCE Transfer to .............. .............. -112,000 Title IX: Depot Maintenanc e BSS1 BASE OPERATING 2,188,883 2,190,083 +1,200 SUPPORT Budget .............. .............. -13,800 Justificat ion Does Not Match Summary of Price and Program Changes for Rents Environment .............. .............. +15,000 al Conservati on for Ranges to Address Shortfalls 3C1F RECRUITING AND 168,609 178,609 +10,000 ADVERTISING Marine .............. .............. +10,000 Corps--Req uested Transfer from Procuremen t, Marine Corps Line 2 for Advertisin g Expenses 9999 OTHER PROGRAMS 346,071 341,071 -5,000 Removal of .............. .............. -5,000 One-Time Fiscal Year 2012 Costs for Technical Services Organizati on Relocation Incentive UNDIST Unjustified .............. .............. -30,000 Growth in Civilian Personnel Compensation UNDIST Excess Working .............. .............. -6,800 Capital Fund Carry Over ------------------------------------------------------------------------ Operation and Maintenance, Air Force Appropriations, 2012.................................... $34,985,486,000 Budget estimate, 2013................................... 35,435,360,000 House allowance......................................... 35,384,795,000 Committee recommendation................................ 34,983,793,000 The Committee recommends an appropriation of $34,983,793,000. This is $451,567,000 below the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [In thousands of dollars] -------------------------------------------------------------------------------------------------------------------------------------------------------- Change from 2013 budget House Committee ------------------------------- Item estimate allowance recommendation Budget House estimate allowance -------------------------------------------------------------------------------------------------------------------------------------------------------- OPERATION AND MAINTENANCE, AIR FORCE BUDGET ACTIVITY 1: OPERATING FORCES AIR OPERATIONS PRIMARY COMBAT FORCES 2,973,141 2,963,141 2,903,141 -70,000 -60,000 COMBAT ENHANCEMENT FORCES 1,611,032 1,743,513 1,611,032 .............. -132,481 AIR OPERATIONS TRAINING 1,472,806 1,422,806 1,404,526 -68,280 -18,280 DEPOT MAINTENANCE 5,545,470 5,545,470 5,537,470 -8,000 -8,000 FACILITIES SUSTAINMENT, RESTORATION & MODERNIZATION 1,353,987 1,489,386 1,353,987 .............. -135,399 BASE OPERATING SUPPORT 2,595,032 2,534,984 2,597,532 +2,500 +62,548 COMBAT RELATED OPERATIONS GLOBAL C3I AND EARLY WARNING 957,040 957,040 982,753 +25,713 +25,713 OTHER COMBAT OPERATIONS SUPPORT PROGRAMS 916,200 916,200 903,200 -13,000 -13,000 TACTICAL INTELLIGENCE AND SPECIAL ACTIVITIES 733,716 733,716 733,716 .............. .............. SPACE OPERATIONS LAUNCH FACILITIES 314,490 314,490 314,490 .............. .............. SPACE CONTROL SYSTEMS 488,762 488,762 463,762 -25,000 -25,000 COMBATANT COMMANDERS DIRECT MISSION SUPPORT 862,979 737,412 850,979 -12,000 +113,567 COMBATANT COMMANDERS CORE OPERATIONS 222,429 163,962 222,429 .............. +58,467 --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 1 20,047,084 20,010,882 19,879,017 -168,067 -131,865 BUDGET ACTIVITY 2: MOBILIZATION MOBILITY OPERATIONS AIRLIFT OPERATIONS 1,785,379 1,985,379 1,785,379 .............. -200,000 MOBILIZATION PREPAREDNESS 154,049 154,049 154,049 .............. .............. DEPOT MAINTENANCE 1,477,396 1,477,396 1,477,396 .............. .............. FACILITIES SUSTAINMENT, RESTORATION & MODERNIZATION 309,699 340,669 309,699 .............. -30,970 BASE SUPPORT 707,574 707,574 707,574 .............. .............. --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 2 4,434,097 4,665,067 4,434,097 .............. -230,970 BUDGET ACTIVITY 3: TRAINING AND RECRUITING ACCESSION TRAINING OFFICER ACQUISITION 115,427 115,427 115,427 .............. .............. RECRUIT TRAINING 17,619 17,619 17,619 .............. .............. RESERVE OFFICER TRAINING CORPS [ROTC] 92,949 92,949 92,949 .............. .............. FACILITIES SUSTAINMENT, RESTORATION & MODERNIZATION 336,433 370,076 336,433 .............. -33,643 BASE SUPPORT (ACADEMIES ONLY) 842,441 793,441 842,441 .............. +49,000 BASIC SKILLS AND ADVANCED TRAINING SPECIALIZED SKILL TRAINING 482,634 482,634 482,634 .............. .............. FLIGHT TRAINING 750,609 750,609 750,609 .............. .............. PROFESSIONAL DEVELOPMENT EDUCATION 235,114 235,114 235,114 .............. .............. TRAINING SUPPORT 101,231 101,231 101,231 .............. .............. DEPOT MAINTENANCE 233,330 233,330 233,330 .............. .............. RECRUITING, AND OTHER TRAINING AND EDUCATION RECRUITING AND ADVERTISING 130,217 130,217 130,217 .............. .............. EXAMINING 2,738 2,738 2,738 .............. .............. OFF DUTY AND VOLUNTARY EDUCATION 155,170 155,170 155,170 .............. .............. CIVILIAN EDUCATION AND TRAINING 175,147 175,147 175,147 .............. .............. JUNIOR ROTC 74,809 74,809 74,809 .............. .............. --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 3 3,745,868 3,730,511 3,745,868 .............. +15,357 BUDGET ACTIVITY 4: ADMIN & SERVICEWIDE ACTIVITIES LOGISTICS OPERATIONS LOGISTICS OPERATIONS 1,029,734 1,029,734 1,029,734 .............. .............. TECHNICAL SUPPORT ACTIVITIES 913,843 913,843 913,843 .............. .............. DEPOT MAINTENANCE .............. 29,163 .............. .............. -29,163 FACILITIES SUSTAINMENT, RESTORATION & MODERNIZATION 303,610 333,971 303,610 .............. -30,361 BASE SUPPORT 1,266,800 1,266,800 1,266,800 .............. .............. SERVICEWIDE ACTIVITIES ADMINISTRATION 587,654 587,654 581,154 -6,500 -6,500 SERVICEWIDE COMMUNICATIONS 667,910 667,910 667,910 .............. .............. OTHER SERVICEWIDE ACTIVITIES 1,094,509 1,094,509 1,094,509 .............. .............. CIVIL AIR PATROL CORPORATION 23,904 28,404 28,404 +4,500 .............. SUPPORT TO OTHER NATIONS INTERNATIONAL SUPPORT 81,307 81,307 81,307 .............. .............. OTHER PROGRAMS OTHER PROGRAMS 1,239,040 1,239,040 1,239,040 .............. .............. --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 4 7,208,311 7,272,335 7,206,311 -2,000 -66,024 INVENTORY OF SPARE PARTS AND SECONDARY ITEMS .............. -400,000 .............. .............. +400,000 RETAIN AIR FORCE FORCE STRUCTURE .............. 130,000 14,500 +14,500 -115,500 CIVILIAN PERSONNEL COMPENSATION .............. .............. -226,000 -226,000 -226,000 FOREIGN NATIONAL INDIRECT HIRES .............. .............. -12,000 -12,000 -12,000 ADJUSTMENT (AIR NATIONAL GUARD) (HOUSE) .............. -24,000 .............. .............. +24,000 EXCESS WORKING CAPITAL FUND CARRYOVER .............. .............. -58,000 -58,000 -58,000 ================================================================================= TOTAL, OPERATION AND MAINTENANCE, AIR FORCE 35,435,360 35,384,795 34,983,793 -451,567 -401,002 -------------------------------------------------------------------------------------------------------------------------------------------------------- COMMITTEE RECOMMENDED ADJUSTMENTS The following table details the adjustments recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ 2013 budget Committee Change from Line Item estimate recommendation budget estimate ------------------------------------------------------------------------ 011A PRIMARY COMBAT 2,973,141 2,903,141 -70,000 FORCES Transfer .............. .............. -70,000 to Title IX: Theater Security Package 011C COMBAT 1,611,032 1,611,032 ............... ENHANCEMENT FORCES Global .............. .............. [133,000] Hawk Block 30 Operation s and Sustainme nt Costs 011D AIR OPERATIONS 1,472,806 1,404,526 -68,280 TRAINING (OJT, MAINTAIN SKILLS) Transfer .............. .............. -68,280 to Title IX: Flag Exercises 011M DEPOT 5,545,470 5,537,470 -8,000 MAINTENANCE Sustainmen .............. .............. -8,000 t Funding Decrease Not Accounted for In Budget Justifica tion for Cancellat ion of Light Attack Armed Reconnais sance Aircraft 011Z BASE SUPPORT 2,595,032 2,597,532 +2,500 Unjustifie .............. .............. -12,500 d Request Environmen .............. .............. +15,000 tal Conservat ion for Ranges to Address Shortfall s 012A GLOBAL C3I AND 957,040 982,753 +25,713 EARLY WARNING Transfer .............. .............. +25,713 from Research, Developme nt, Test and Evaluatio n, Air Force Line 59-- Nuclear Weapons Support 012C OTHER COMBAT 916,200 903,200 -13,000 OPS SPT PROGRAMS Budget .............. .............. -13,000 Justifica tion Does Not Match Summary of Price and Program Changes for the Defense Informati on Services Agency [DISA] Bill 013C SPACE CONTROL 488,762 463,762 -25,000 SYSTEMS Decrease .............. .............. -25,000 for Air Force Satellite Control Network Not Properly Accounted for in Budget Justifica tion 015A COMBATANT 862,979 850,979 -12,000 COMMANDERS DIRECT MISSION SUPPORT Civilian .............. .............. -12,000 Pay Inconsist ency for Joint Forces Command Restructu re 042A ADMINISTRATION 587,654 581,154 -6,500 Unjustifie .............. .............. -6,500 d Increase for Personnel Service Delivery 042I CIVIL AIR 23,904 28,404 +4,500 PATROL Civil Air .............. .............. +4,500 Patrol UNDIST Unjustified .............. .............. -226,000 Growth For Civilian Personnel Compensation UNDIST Incorrect .............. .............. -12,000 Pricing Adjustment for Foreign National Indirect Hires UNDIST Excess Working .............. .............. -58,000 Capital Fund Carry Over UNDIST Retain Air .............. .............. +14,500 Force Force Structure ------------------------------------------------------------------------ Operation and Maintenance, Defense-Wide Appropriations, 2012.................................... $30,152,008,000 Budget estimate, 2013................................... 31,993,013,000 House allowance......................................... 31,740,813,000 Committee recommendation................................ 31,331,839,000 The Committee recommends an appropriation of $31,331,839,000. This is $661,174,000 below the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [In thousands of dollars] -------------------------------------------------------------------------------------------------------------------------------------------------------- Change from 2013 budget House Committee ------------------------------- Item estimate allowance recommendation Budget House estimate allowance -------------------------------------------------------------------------------------------------------------------------------------------------------- OPERATION AND MAINTENANCE, DEFENSE-WIDE BUDGET ACTIVITY 1: OPERATING FORCES JOINT CHIEFS OF STAFF 485,708 485,708 475,708 -10,000 -10,000 SPECIAL OPERATIONS COMMAND 5,091,001 5,100,101 4,497,120 -593,881 -602,981 --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 1 5,576,709 5,585,809 4,972,828 -603,881 -612,981 BUDGET ACTIVITY 3: TRAINING AND RECRUITING DEFENSE ACQUISITION UNIVERSITY 147,210 147,210 147,210 .............. .............. NATIONAL DEFENSE UNIVERSITY 84,999 81,999 84,999 .............. +3,000 --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 3 232,209 229,209 232,209 .............. +3,000 BUDGET ACTIVITY 4: ADMIN & SERVICEWIDE ACTIVITIES CIVIL MILITARY PROGRAMS 161,294 171,294 171,294 +10,000 .............. DEFENSE CONTRACT AUDIT AGENCY 573,973 573,973 573,973 .............. .............. DEFENSE CONTRACT MANAGEMENT AGENCY 1,293,196 1,292,596 1,293,196 .............. +600 DEFENSE FINANCE AND ACCOUNTING SERVICE 17,513 17,513 17,513 .............. .............. DEFENSE HUMAN RESOURCES ACTIVITY 676,186 676,186 676,186 .............. .............. DEFENSE INFORMATION SYSTEMS AGENCY 1,346,847 1,346,847 1,336,847 -10,000 -10,000 DEFENSE LEGAL SERVICES AGENCY 35,137 35,137 35,137 .............. .............. DEFENSE LOGISTICS AGENCY 431,893 441,893 434,393 +2,500 -7,500 DEFENSE MEDIA ACTIVITY 224,013 224,013 224,013 .............. .............. DEFENSE POW/MISSING PERSONS OFFICE 21,964 21,964 21,964 .............. .............. DEFENSE SECURITY COOPERATION AGENCY 557,917 542,917 542,917 -15,000 .............. DEFENSE SECURITY SERVICE .............. .............. 506,662 +506,662 +506,662 DEFENSE TECHNOLOGY SECURITY AGENCY 35,319 35,319 35,319 .............. .............. DEFENSE THREAT REDUCTION AGENCY .............. .............. 443,382 +443,382 +443,382 DEPARTMENT OF DEFENSE EDUCATION ACTIVITY 2,744,971 2,744,971 2,787,971 +43,000 +43,000 MISSILE DEFENSE AGENCY 259,975 259,975 253,975 -6,000 -6,000 OFFICE OF ECONOMIC ADJUSTMENT 253,437 263,437 220,437 -33,000 -43,000 OFFICE OF THE SECRETARY OF DEFENSE 2,095,362 2,105,362 2,081,762 -13,600 -23,600 WASHINGTON HEADQUARTERS SERVICES 521,297 521,297 509,297 -12,000 -12,000 --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 4 11,250,294 11,274,694 12,166,238 +915,944 +891,544 OSD IDENTIFIED SCHOOL CAPACITY OR CONDITION SHORTFALL. .............. -51,000 .............. .............. +51,000 IMPACT AID .............. 40,000 40,000 +40,000 .............. IMPACT AID FOR CHILDREN WITH DISABILITIES .............. .............. 5,000 +5,000 +5,000 OTHER PROGRAMS 14,933,801 14,702,101 13,915,564 -1,018,237 -786,537 ADJUSTMENT (HOUSE) .............. -40,000 .............. .............. +40,000 ================================================================================= TOTAL, OPERATION AND MAINTENANCE, DEFENSE-WIDE 31,993,013 31,740,813 31,331,839 -661,174 -408,974 -------------------------------------------------------------------------------------------------------------------------------------------------------- COMMITTEE RECOMMENDED ADJUSTMENTS The following table details the adjustments recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ JOINT CHIEFS OF 485,708 475,708 -10,000 STAFF Budget .............. .............. -10,000 Justificat ion Does Not Match Summary of Price and Program Changes for the Pentagon Reservatio n Maintenanc e Revolving Fund SPECIAL 5,091,001 4,497,120 -593,881 OPERATIONS COMMAND Non- .............. .............. -53,000 Standard Aviation [NSAv] and Aviation Foreign Internal Defense [AvFID] Consolidat ion Excess to Need Unjustified .............. .............. -40,000 Growth in Per- Graduate Costs for Initial Skills Training Decrease .............. .............. -15,000 Shown in Spare and Repair Parts Metrics Not Properly Accounted for in Budget Justificat ion Classified .............. .............. -42,707 Adjustment Transfer to .............. .............. -443,174 Title IX: SOCOM-Iden tified Costs Moved into the Base Budget in Fiscal Year 2013 Previously Funded in OCO CIVIL MILITARY 161,294 171,294 +10,000 PROGRAMS Youth .............. .............. +5,000 Challenge STARBASE .............. .............. +5,000 DEFENSE 1,346,847 1,336,847 -10,000 INFORMATION SYSTEMS AGENCY Program .............. .............. -10,000 Growth Requested for Circuit Transition Maintenanc e Unsupporte d by Program Metrics DEFENSE 431,893 434,393 +2,500 LOGISTICS AGENCY Unjustified .............. .............. -7,500 Growth for Virtual Interactiv e Processing Systems [VIPS] Procurement .............. .............. +10,000 Technical Assistance DEFENSE THREAT .............. 443,382 +443,382 REDUCTION AGENCY Transfer .............. .............. +443,382 from Other Programs Line for DTRA Budget Request DEPARTMENT OF 2,744,971 2,787,971 +43,000 DEFENSE EDUCATION AGENCY Restore .............. .............. +43,000 Unjustifie d Reduction DEFENSE 557,917 542,917 -15,000 SECURITY COOPERATION AGENCY Authorizati .............. .............. -15,000 on Adjustment : Global Train and Equip DEFENSE .............. 506,662 +506,662 SECURITY SERVICE Transfer .............. .............. +506,662 from Other Programs Line for DSS Budget Request MISSILE DEFENSE 259,975 253,975 -6,000 AGENCY THAAD .............. .............. -6,000 Excess to Requiremen t OFFICE OF 253,437 220,437 -33,000 ECONOMIC ADJUSTMENT Mental .............. .............. -33,000 Health and Substance Abuse Facility and Regional Public Health Laboratory Funds Requested Ahead of Need OFFICE OF THE 2,095,362 2,081,762 -13,600 SECRETARY OF DEFENSE Defense .............. .............. -3,500 Chief Management Office: Transfer to Defense Logistics Agency for Rental Payments Not Properly Accounted for in Budget Justificat ion OSD AT&L: .............. .............. -4,000 Realignmen t of Funding for Contingenc y Business Tools Not Properly Accounted for in Budget Justificat ion OSD Policy: .............. .............. -3,500 Transfer to Defense Logistics Agency for Continuity of Operations Not Properly Accounted for in Budget Justificat ion OSD P&R: .............. .............. -2,600 Transfer to Washington Headquarte rs Service for the Single Enterprise Contractin g Office Not Properly Accounted for in Budget Justificat ion WASHINGTON 521,297 509,297 -12,000 HEADQUARTERS SERVICE Removal of .............. .............. -12,000 One-Time Fiscal Year 2012 Cost for Centrally- Funded Mark Center Rent OTHER PROGRAMS 14,933,801 13,915,564 -1,018,237 Transfer to .............. .............. -506,662 DSS for Budget Request Transfer to .............. .............. -443,382 DTRA for Budget Request Classified .............. .............. -118,193 Adjustment Additional .............. .............. +50,000 ISR Support to Operation Observant Compass--A uthorizati on Increase UNDIST Impact Aid for .............. .............. +5,000 Children with Severe Disabilities-- Authorization Increase UNDIST Impact Aid-- .............. .............. +40,000 Authorization Increase ------------------------------------------------------------------------ Military Dependent Student Online Assistance.--The Committee understands children of active duty military families are faced with unique educational challenges in part because of frequent changes of station over the course of childhood. To better address these challenges, military parents can substantially benefit from access to Internet-based educational resources that can be brought to bear on the individualized needs of their children. The Department is encouraged to provide an assessment tool with accompanying resource material that helps parents to engage with children to develop conceptual understandings and to improve learning and skills. State and Local Partnerships.--The Committee encourages the Secretary of Defense, in conjunction with the services, to consider entering cooperative agreements with State and local governments for use of certain multiuse military facilities for public affairs activities that benefit local job creation, including commercial activities that promote American technology. The Committee expects any such agreements would be at no cost to the military and would not impede accomplishing the inherent mission of the facility. Defense Language and National Security Education Office.-- The Committee recognizes that, in partnership with universities across the country, the Defense Language and National Security Education Office provides critical training for servicemembers and government officials in a number of languages and strategic cultures, including those of the Arab world, Afghanistan, China, and Iran. The Committee encourages the Department of Defense to continue placing a high priority on these programs to ensure warfighters receive the language and culture training needed to complete their missions effectively and to ensure that inadequate funding levels do not delay or deny this valuable training. Military Use Airspace.--The Committee encourages the Department of Defense to continue to utilize national assets such as the Hays Military Operations Area to maintain airborne combat readiness for both manned and remotely piloted aircraft. Military Service Awards.--The Committee understands that the Department of Defense is committed to enhancing its ability to verify award of military decorations through a comprehensive database. At the present time, however, the process remains manually intensive and more work needs to be done to verify the authenticity of documentation and prevent the improper awarding of service awards. Therefore, the Committee encourages the Department of Defense to continue its efforts to improve its database in order to preserve the integrity of military service awards and to better ensure that veterans receive their due recognition. Middle East Regional Security Studies Programs.--The Committee encourages the Department of Defense to continue to support established university programs that promote region- wide informal conferences and task forces on arms control, regional security, and related topics to the Middle East for Arab, Israeli and other officials and experts engaged in these issues. Operation and Maintenance, Army Reserve Appropriations, 2012.................................... $3,071,733,000 Budget estimate, 2013................................... 3,162,008,000 House allowance......................................... 3,199,423,000 Committee recommendation................................ 3,140,508,000 The Committee recommends an appropriation of $3,140,508,000. This is $21,500,000 below the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [In thousands of dollars] -------------------------------------------------------------------------------------------------------------------------------------------------------- Change from 2013 budget House Committee ------------------------------- Item estimate allowance recommendation Budget House estimate allowance -------------------------------------------------------------------------------------------------------------------------------------------------------- OPERATION AND MAINTENANCE, ARMY RESERVE BUDGET ACTIVITY 1: OPERATING FORCES LAND FORCES MANEUVER UNITS 1,391 1,391 1,391 .............. .............. MODULAR SUPPORT BRIGADES 20,889 20,889 20,889 .............. .............. ECHELONS ABOVE BRIGADES 592,724 592,724 586,724 -6,000 -6,000 THEATER LEVEL ASSETS 114,983 114,983 114,983 .............. .............. LAND FORCES OPERATIONS SUPPORT 633,091 630,091 622,591 -10,500 -7,500 AVIATION ASSETS 76,823 76,823 76,823 .............. .............. LAND FORCES READINESS FORCES READINESS OPERATIONS SUPPORT 481,997 480,147 481,997 .............. +1,850 LAND FORCES SYSTEM READINESS 70,118 70,118 70,118 .............. .............. DEPOT MAINTENANCE 141,205 189,205 141,205 .............. -48,000 LAND FORCES READINESS SUPPORT BASE OPERATIONS SUPPORT 561,878 561,878 561,878 .............. .............. FACILITIES SUSTAINMENT, RESTORATION & MODERNIZATION 287,399 316,139 287,399 .............. -28,740 MANAGEMENT AND OPERATIONS HEADQUARTERS 52,431 52,431 52,431 .............. .............. --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 1 3,034,929 3,106,819 3,018,429 -16,500 -88,390 BUDGET ACTIVITY 4: ADMIN & SERVICEWIDE ACTIVITIES ADMINISTRATION AND SERVICEWIDE ACTIVITIES SERVICEWIDE TRANSPORTATION 12,995 12,995 12,995 .............. .............. ADMINISTRATION 32,432 32,432 32,432 .............. .............. SERVICEWIDE COMMUNICATIONS 4,895 4,895 4,895 .............. .............. PERSONNEL/FINANCIAL ADMINISTRATION 16,074 11,574 11,074 -5,000 -500 RECRUITING AND ADVERTISING 60,683 54,708 60,683 .............. +5,975 --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 4 127,079 116,604 122,079 -5,000 +5,475 UNEXECUTABLE OPTEMPO GROWTH .............. -24,000 .............. .............. +24,000 ================================================================================= TOTAL, OPERATION AND MAINTENANCE, ARMY RESERVE 3,162,008 3,199,423 3,140,508 -21,500 -58,915 -------------------------------------------------------------------------------------------------------------------------------------------------------- COMMITTEE RECOMMENDED ADJUSTMENTS The following table details the adjustments recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ 113 ECHELONS ABOVE 592,724 586,724 -6,000 BRIGADE Budget .............. .............. -6,000 Justificat ion Does Not Match Summary of Price and Program Changes for Full Time Support Costs 115 LAND FORCES 633,091 622,591 -10,500 OPERATIONS SUPPORT Budget .............. .............. -6,500 Justificat ion Does Not Match Summary of Price and Program Changes for Full Time Support Costs Budget .............. .............. -4,000 Justificat ion Does Not Match Summary of Price and Program Changes for Management and Profession al Services 433 PERSONNEL/ 16,074 11,074 -5,000 FINANCIAL ADMINISTRATION Unjustified .............. .............. -5,000 Growth for Civilian Personnel ------------------------------------------------------------------------ Operation and Maintenance, Navy Reserve Appropriations, 2012.................................... $1,305,134,000 Budget estimate, 2013................................... 1,246,982,000 House allowance......................................... 1,256,347,000 Committee recommendation................................ 1,246,982,000 The Committee recommends an appropriation of $1,246,982,000. This is equal to the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [In thousands of dollars] -------------------------------------------------------------------------------------------------------------------------------------------------------- Change from 2013 budget House Committee ------------------------------- Item estimate allowance recommendation Budget House estimate allowance -------------------------------------------------------------------------------------------------------------------------------------------------------- OPERATION AND MAINTENANCE, NAVY RESERVE BUDGET ACTIVITY 1: OPERATING FORCES RESERVE AIR OPERATIONS MISSION AND OTHER FLIGHT OPERATIONS 616,776 616,776 616,776 .............. .............. INTERMEDIATE MAINTENANCE 15,076 15,076 15,076 .............. .............. AIR OPERATIONS AND SAFETY SUPPORT 1,479 1,479 1,479 .............. .............. AIRCRAFT DEPOT MAINTENANCE 107,251 110,551 107,251 .............. -3,300 AIRCRAFT DEPOT OPERATIONS SUPPORT 355 355 355 .............. .............. RESERVE SHIP OPERATIONS MISSION AND OTHER SHIP OPERATIONS 82,186 82,186 82,186 .............. .............. SHIP OPERATIONAL SUPPORT AND TRAINING 589 589 589 .............. .............. SHIP DEPOT MAINTENANCE 48,593 48,593 48,593 .............. .............. RESERVE COMBAT OPERATIONS SUPPORT COMBAT COMMUNICATIONS 15,274 15,274 15,274 .............. .............. COMBAT SUPPORT FORCES 124,917 124,917 124,917 .............. .............. RESERVE WEAPONS SUPPORT WEAPONS MAINTENANCE 1,978 1,978 1,978 .............. .............. ENTERPRISE INFORMATION TECHNOLOGY 43,699 43,699 43,699 .............. .............. BASE OPERATING SUPPORT FACILITIES SUSTAINMENT, RESTORATION & MODERNIZATION 60,646 66,711 60,646 .............. -6,065 BASE OPERATING SUPPORT 105,227 105,227 105,227 .............. .............. --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 1 1,224,046 1,233,411 1,224,046 .............. -9,365 BUDGET ACTIVITY 4: ADMIN & SERVICEWIDE ACTIVITIES ADMINISTRATION AND SERVICEWIDE ACTIVITIES ADMINISTRATION 3,117 3,117 3,117 .............. .............. MILITARY MANPOWER & PERSONNEL 14,337 14,337 14,337 .............. .............. SERVICEWIDE COMMUNICATIONS 2,392 2,392 2,392 .............. .............. ACQUISITION AND PROGRAM MANAGEMENT 3,090 3,090 3,090 .............. .............. --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 4 22,936 22,936 22,936 .............. .............. ================================================================================= TOTAL, OPERATION AND MAINTENANCE, NAVY RESERVE 1,246,982 1,256,347 1,246,982 .............. -9,365 -------------------------------------------------------------------------------------------------------------------------------------------------------- Operation and Maintenance, Marine Corps Reserve Appropriations, 2012.................................... $271,443,000 Budget estimate, 2013................................... 272,285,000 House allowance......................................... 277,377,000 Committee recommendation................................ 272,285,000 The Committee recommends an appropriation of $272,285,000. This is equal to the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [In thousands of dollars] -------------------------------------------------------------------------------------------------------------------------------------------------------- Change from 2013 budget House Committee ------------------------------- Item estimate allowance recommendation Budget House estimate allowance -------------------------------------------------------------------------------------------------------------------------------------------------------- OPERATION AND MAINTENANCE, MARINE CORPS RESERVE BUDGET ACTIVITY 1: OPERATING FORCES EXPEDITIONARY FORCES OPERATING FORCES 89,690 89,690 89,690 .............. .............. DEPOT MAINTENANCE 16,735 16,735 16,735 .............. .............. FACILITIES SUSTAINMENT, RESTORATION & MODERNIZATION 37,913 41,704 37,913 .............. -3,791 BASE OPERATING SUPPORT 103,746 105,047 103,746 .............. -1,301 --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 1 248,084 253,176 248,084 .............. -5,092 BUDGET ACTIVITY 4: ADMIN & SERVICEWIDE ACTIVITIES ADMINISTRATION AND SERVICEWIDE ACTIVITIES SERVICEWIDE TRANSPORTATION 873 873 873 .............. .............. ADMINISTRATION 14,330 14,330 14,330 .............. .............. RECRUITING AND ADVERTISING 8,998 8,998 8,998 .............. .............. --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 4 24,201 24,201 24,201 .............. .............. ================================================================================= TOTAL, OPERATION & MAINTENANCE, MARINE CORPS RESERVE 272,285 277,377 272,285 .............. -5,092 -------------------------------------------------------------------------------------------------------------------------------------------------------- Operation and Maintenance, Air Force Reserve Appropriations, 2012.................................... $3,274,359,000 Budget estimate, 2013................................... 3,166,482,000 House allowance......................................... 3,362,041,000 Committee recommendation................................ 3,227,382,000 The Committee recommends an appropriation of $3,227,382,000. This is $60,900,000 above the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [In thousands of dollars] -------------------------------------------------------------------------------------------------------------------------------------------------------- Change from 2013 budget House Committee ------------------------------- Item estimate allowance recommendation Budget House estimate allowance -------------------------------------------------------------------------------------------------------------------------------------------------------- OPERATION AND MAINTENANCE, AIR FORCE RESERVE BUDGET ACTIVITY 1: OPERATING FORCES AIR OPERATIONS PRIMARY COMBAT FORCES 2,089,326 1,985,215 2,089,326 .............. +104,111 MISSION SUPPORT OPERATIONS 112,992 112,992 112,992 .............. .............. DEPOT MAINTENANCE 406,101 536,998 406,101 .............. -130,897 FACILITIES SUSTAINMENT, RESTORATION & MODERNIZATION 71,564 78,720 71,564 .............. -7,156 BASE OPERATING SUPPORT 364,862 364,862 364,862 .............. .............. --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 1 3,044,845 3,078,787 3,044,845 .............. -33,942 BUDGET ACTIVITY 4: ADMIN & SERVICEWIDE ACTIVITIES ADMINISTRATION AND SERVICEWIDE ACTIVITIES ADMINISTRATION 78,824 78,824 78,824 .............. .............. RECRUITING AND ADVERTISING 16,020 16,020 16,020 .............. .............. MILITARY MANPOWER AND PERSONNEL MANAGEMENT 19,496 19,496 19,496 .............. .............. OTHER PERSONNEL SUPPORT 6,489 6,489 6,489 .............. .............. AUDIOVISUAL 808 808 808 .............. .............. --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 4 121,637 121,637 121,637 .............. .............. RETAIN AIR FORCE RESERVE FORCE STRUCTURE .............. 161,617 66,400 +66,400 -95,217 CIVILIAN PERSONNEL COMPENSATION .............. .............. -5,500 -5,500 -5,500 ================================================================================= TOTAL, OPERATION AND MAINTENANCE, AIR FORCE RESERVE. 3,166,482 3,362,041 3,227,382 +60,900 -134,659 -------------------------------------------------------------------------------------------------------------------------------------------------------- COMMITTEE RECOMMENDED ADJUSTMENTS The following table details the adjustments recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ UNDIST Unjustified .............. .............. -5,500 Growth in Civilian Personnel Compensation UNDIST Retain Air .............. .............. +66,400 Force Reserve Force Structure ------------------------------------------------------------------------ Operation and Maintenance, Army National Guard Appropriations, 2012.................................... $6,924,932,000 Budget estimate, 2013................................... 7,108,612,000 House allowance......................................... 7,187,731,000 Committee recommendation................................ 7,075,042,000 The Committee recommends an appropriation of $7,075,042,000. This is $33,570,000 below the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [In thousands of dollars] -------------------------------------------------------------------------------------------------------------------------------------------------------- Change from 2013 budget House Committee ------------------------------- Item estimate allowance recommendation Budget House estimate allowance -------------------------------------------------------------------------------------------------------------------------------------------------------- OPERATION AND MAINTENANCE, ARMY NATIONAL GUARD BUDGET ACTIVITY 1: OPERATING FORCES LAND FORCES MANEUVER UNITS 680,206 680,206 680,206 .............. .............. MODULAR SUPPORT BRIGADES 186,408 186,408 186,408 .............. .............. ECHELONS ABOVE BRIGADE 865,628 865,628 861,128 -4,500 -4,500 THEATER LEVEL ASSETS 112,651 112,651 112,651 .............. .............. LAND FORCES OPERATIONS SUPPORT 36,091 36,091 36,091 .............. .............. AVIATION ASSETS 907,011 907,011 902,011 -5,000 -5,000 LAND FORCES READINESS FORCE READINESS OPERATIONS SUPPORT 751,606 751,606 751,606 .............. .............. LAND FORCES SYSTEMS READINESS 60,043 60,043 60,043 .............. .............. LAND FORCES DEPOT MAINTENANCE 411,940 411,940 411,940 .............. .............. LAND FORCES READINESS SUPPORT BASE OPERATIONS SUPPORT 995,423 995,423 995,423 .............. .............. FACILITIES SUSTAINMENT, RESTORATION & MODERNIZATION 688,189 757,008 688,189 .............. -68,819 MANAGEMENT AND OPERATIONAL HEADQUARTERS 953,716 953,716 936,693 -17,023 -17,023 --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 1 6,648,912 6,717,731 6,622,389 -26,523 -95,342 BUDGET ACTIVITY 4: ADMIN & SERVICEWIDE ACTIVITIES ADMINISTRATION AND SERVICEWIDE ACTIVITIES SERVICEWIDE TRANSPORTATION 11,806 11,806 11,806 .............. .............. REAL ESTATE MANAGEMENT 1,656 1,656 1,656 .............. .............. ADMINISTRATION 89,358 89,358 82,311 -7,047 -7,047 SERVICEWIDE COMMUNICATIONS 39,513 39,513 39,513 .............. .............. MANPOWER MANAGEMENT 7,224 7,224 7,224 .............. .............. RECRUITING AND ADVERTISING 310,143 310,143 310,143 .............. .............. --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 4 459,700 459,700 452,653 -7,047 -7,047 RETAIN ARMY NATIONAL GUARD FORCE STRUCTURE .............. 10,300 .............. .............. -10,300 ================================================================================= TOTAL, OPERATION & MAINTENANCE, ARMY NATIONAL GUARD. 7,108,612 7,187,731 7,075,042 -33,570 -112,689 -------------------------------------------------------------------------------------------------------------------------------------------------------- COMMITTEE RECOMMENDED ADJUSTMENTS The following table details the adjustments recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ 113 ECHELONS ABOVE 865,628 861,128 -4,500 BRIGADE Budget .............. .............. -4,500 Justificat ion Does Not Match Summary of Price and Program Changes for Management and Profession al Services 116 AVIATION ASSETS 907,011 902,011 -5,000 Budget .............. .............. -5,000 Justificat ion Does Not Match Summary of Price and Program Changes for Fuel 133 MANAGEMENT AND 953,716 936,693 -17,023 OPERATIONAL HQ Unjustified .............. .............. -17,023 Growth for Mission Support 431 ADMINISTRATION 89,358 82,311 -7,047 Unjustified .............. .............. -7,047 Growth for Mission Support ------------------------------------------------------------------------ Advance Trauma Training Program for National Guard Homeland Response Forces [HRFs].--The Committee recognizes the valuable support universities, hospitals, and other military partners provide in implementing the emergency response trauma training requirements to start up Homeland Response Forces [HRFs] initiated in the 2010 Quadrennial Defense Review [QDR]. The Committee encourages the National Guard to continue working with these partners as the Guard converts Chemical, Biological, Radiological and Nuclear [CBRNE] Enhanced Response Force Packages to HRFs and to ensure our National Guard medical professionals have the best training possible so they are prepared to respond to emergency situations here and abroad. Operation and Maintenance, Air National Guard Appropriations, 2012.................................... $6,098,780,000 Budget estimate, 2013................................... 6,015,455,000 House allowance......................................... 6,616,826,000 Committee recommendation................................ 6,493,155,000 The Committee recommends an appropriation of $6,493,155,000. This is $477,700,000 above the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [In thousands of dollars] -------------------------------------------------------------------------------------------------------------------------------------------------------- Change from 2013 budget House Committee ------------------------------- Item estimate allowance recommendation Budget House estimate allowance -------------------------------------------------------------------------------------------------------------------------------------------------------- OPERATION AND MAINTENANCE, AIR NATIONAL GUARD BUDGET ACTIVITY 1: OPERATING FORCES AIR OPERATIONS AIRCRAFT OPERATIONS 3,559,824 3,099,094 3,559,824 .............. +460,730 MISSION SUPPORT OPERATIONS 721,225 681,251 721,225 .............. +39,974 DEPOT MAINTENANCE 774,875 1,555,079 1,034,875 +260,000 -520,204 FACILITIES SUSTAINMENT, RESTORATION & MODERNIZATION 270,709 297,780 270,709 .............. -27,071 BASE OPERATING SUPPORT 624,443 624,443 624,443 .............. .............. --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 1 5,951,076 6,257,647 6,211,076 +260,000 -46,571 BUDGET ACTIVITY 4: ADMIN & SERVICEWIDE ACTIVITIES SERVICEWIDE ACTIVITIES ADMINISTRATION 32,358 32,358 32,358 .............. .............. RECRUITING AND ADVERTISING 32,021 32,021 32,021 .............. .............. --------------------------------------------------------------------------------- TOTAL, BUDGET ACTIVITY 4 64,379 64,379 64,379 .............. .............. RETAIN AIR NATIONAL GUARD FORCE STRUCTURE .............. 286,800 255,700 +255,700 -31,100 FIREFIGHTING EQUIPMENT MAFFS (HOUSE) .............. 8,000 .............. .............. -8,000 CIVILIAN PERRSONNEL COMPENSATION .............. .............. -38,000 -38,000 -38,000 ================================================================================= TOTAL, OPERATION & MAINTENANCE, AIR NATIONAL GUARD 6,015,455 6,616,826 6,493,155 +477,700 -123,671 -------------------------------------------------------------------------------------------------------------------------------------------------------- COMMITTEE RECOMMENDED ADJUSTMENTS The following table details the adjustments recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ 011M DEPOT 774,875 1,034,875 +260,000 MAINTENANCE Air Force-- .............. .............. +260,000 Identified Shortfall for Weapons System Sustainmen t UNDIST Unjustified .............. .............. -38,000 Growth in Civilian Personnel Compensation UNDIST Retain Air .............. .............. +255,700 National Guard Force Structure ------------------------------------------------------------------------ U.S. Court of Appeals for the Armed Forces Appropriations, 2012.................................... $13,861,000 Budget estimate, 2013................................... 13,516,000 House allowance......................................... 13,516,000 Committee recommendation................................ 13,516,000 The Committee recommends an appropriation of $13,516,000. This is equal to the budget estimate. Environmental Restoration, Army Appropriations, 2012.................................... $346,031,000 Budget estimate, 2013................................... 335,921,000 House allowance......................................... 335,921,000 Committee recommendation................................ 335,921,000 The Committee recommends an appropriation of $335,921,000. This is equal to the budget estimate. Environmental Restoration, Navy Appropriations, 2012.................................... $308,668,000 Budget estimate, 2013................................... 310,594,000 House allowance......................................... 310,594,000 Committee recommendation................................ 310,594,000 The Committee recommends an appropriation of $310,594,000. This is equal to the budget estimate. Environmental Restoration, Air Force Appropriations, 2012.................................... $525,453,000 Budget estimate, 2013................................... 529,263,000 House allowance......................................... 529,263,000 Committee recommendation................................ 529,263,000 The Committee recommends an appropriation of $529,263,000. This is equal to the budget estimate. Environmental Restoration, Defense-Wide Appropriations, 2012.................................... $10,716,000 Budget estimate, 2013................................... 11,133,000 House allowance......................................... 11,133,000 Committee recommendation................................ 11,133,000 The Committee recommends an appropriation of $11,133,000. This is equal to the budget estimate. National Fish and Wildlife Foundation Public-Private Partnerships.--The Committee is aware of the emerging partnership with the Department of Defense [DOD], the Marine Corps and the congressionally chartered National Fish and Wildlife Foundation to conserve longleaf pine ecosystems. This public-private partnership leverages Federal, State, and private funding to maintain a healthy environment while preserving the mission capacity of the Marine Corps. The Committee encourages DOD to expand this partnership to other areas of the country to leverage funding and bring additional partners into DOD's natural resource conservation programs. Environmental Restoration, Formerly Used Defense Sites Appropriations, 2012.................................... $326,495,000 Budget estimate, 2013................................... 237,543,000 House allowance......................................... 237,543,000 Committee recommendation................................ 287,543,000 The Committee recommends an appropriation of $287,543,000. This is $50,000,000 above the budget estimate to help address unfunded needs. Overseas Humanitarian, Disaster, and Civic Aid Appropriations, 2012.................................... $107,662,000 Budget estimate, 2013................................... 108,759,000 House allowance......................................... 108,759,000 Committee recommendation................................ 108,759,000 The Committee recommends an appropriation of $108,759,000. This is equal to the budget estimate. Cooperative Threat Reduction Account Appropriations, 2012.................................... $508,219,000 Budget estimate, 2013................................... 519,111,000 House allowance......................................... 519,111,000 Committee recommendation................................ 519,111,000 The Committee recommends an appropriation of $519,111,000. This is equal to the budget estimate. Department of Defense Acquisition Workforce Development Fund Appropriations, 2012.................................... $105,501,000 Budget estimate, 2013................................... 274,198,000 House allowance......................................... 50,198,000 Committee recommendation................................ 720,000,000 The Committee recommends an appropriation of $720,000,000. This is $445,802,000 above the budget estimate. The Defense Acquisition Workforce Development Fund was established to ensure that the Department of Defense acquisition workforce has the capacity, in both personnel and skills, needed to properly perform its mission, provide appropriate oversight of contractor performance, and ensure that the Department receives the best value for the expenditure of public resources. To accomplish this, the Department set out to hire and develop a substantial number of new acquisition professionals. According to the Department, fiscal year 2008 had the lowest number of acquisition professionals in this century. Since then, the acquisition workforce has grown from approximately 125,800 to 151,200 which equates to over 20- percent growth. Department officials stated that the hiring in fiscal year 2012 completes the manning requirements needed to improve its acquisition workforce. After fiscal year 2012, new acquisition professionals will be hired only to sustain current manning levels. The fiscal year 2013 budget request proposes $274,198,000 to meet the Department's statutory funding level of $944,000,000; a growth of $224,000,000 over the fiscal year 2012 statutory funding level. Given that the Department has completed expansion of its acquisition workforce in fiscal year 2012, an increase in funding above the fiscal year 2012 level is not justified. Therefore, the Committee recommends the fiscal year 2012 statutory funding level of $720,000,000. TITLE III PROCUREMENT Funds appropriated under this title provide the resources required to purchase military equipment and hardware, including aircraft, ships, missiles, combat vehicles, ammunition, weapons, electronic sensors and communications equipment, and other procurement items. The President's fiscal year 2013 budget requests a total of $97,194,677,000 for procurement appropriations. SUMMARY OF COMMITTEE ACTION The Committee recommends procurement appropriations totaling $97,635,496,000 for fiscal year 2013. This is $440,819,000 above the budget estimate. Committee recommended procurement appropriations for fiscal year 2013 are summarized below: SUMMARY OF PROCUREMENT APPROPRIATIONS [In thousands of dollars] ---------------------------------------------------------------------------------------------------------------- Change from Account 2013 budget Committee budget estimate recommendation estimate ---------------------------------------------------------------------------------------------------------------- Procurement: Aircraft Procurement, Army.................................. 5,853,729 5,414,061 -439,668 Missile Procurement, Army................................... 1,302,689 1,429,665 +126,976 Procurement of WTCV, Army................................... 1,501,706 1,687,823 +186,117 Procurement of Ammunition, Army............................. 1,739,706 1,624,380 -115,326 Other Procurement, Army..................................... 6,326,245 4,980,209 -1,346,036 Aircraft Procurement, Navy.................................. 17,129,296 16,936,358 -192,938 Weapons Procurement, Navy................................... 3,117,578 3,066,919 -50,659 Procurement of Ammunition, Navy and Marine Corps............ 759,539 719,154 -40,385 Shipbuilding and Conversion, Navy........................... 13,579,845 15,614,855 +2,035,010 Other Procurement, Navy..................................... 6,169,378 6,170,286 +908 Procurement, Marine Corps................................... 1,622,955 1,334,448 -288,507 Aircraft Procurement, Air Force............................. 11,002,999 11,260,646 +257,647 Missile Procurement, Air Force.............................. 5,491,846 4,913,276 -578,570 Procurement of Ammunition, Air Force........................ 599,194 593,194 -6,000 Other Procurement, Air Force................................ 16,720,848 17,008,348 +287,500 Procurement, Defense-Wide................................... 4,187,935 4,692,685 +504,750 Defense Production Act Purchases............................ 89,189 189,189 +100,000 ----------------------------------------------- Total..................................................... 97,194,677 97,635,496 +440,819 ---------------------------------------------------------------------------------------------------------------- Procurement Budget Exhibits.--The fiscal year 2013 procurement budget exhibits were generated, for the first time, using a standard Extensible Markup Language [XML] process. The Committee notes that while there was some improvement to data presentation, additional improvement is needed. The justification material did not contain complete and accurate data. In some cases basic data was missing from the documents requiring a separate inquiry to the services. Additionally, the new format for modification programs is very difficult to review. For example, one modification program that was presented on 10 pages in the fiscal year 2012 exhibits is spread across 20 pages in the fiscal year 2013 exhibits. The Under Secretary of Defense, Comptroller is encouraged to make improvements to the exhibit formats that will improve the presentation of the exhibits and ensure complete and accurate data is presented. Organic Industrial Base of the United States Military.--The Committee notes that the organic industrial base of the United States military advances a vital national security interest by producing necessary materials, munitions, and hardware when sources outside of the United States military are unable to meet this urgent need quickly. The Committee believes that the capacity of the organic industrial base of the United States military must be maintained and reminds the Department to carefully weigh any action that would deteriorate this essential capability. Drinking Water Supply Alternatives.--The Committee notes with approval that the Army and Marine Corps plan to use a portion of their funding for medical combat support equipment to purchase water purifications systems. However, the Committee notes that the Army and Marine Corps still overwhelmingly rely on bottled water in field operations and exercises. Not only is bottled water far more expensive than water purified by small unit remote portable systems, but reliance on bottled water leads to thousands of pounds of discarded plastic water bottles every year. The Committee encourages the Army and Marine Corps to jointly develop a plan to acquire drinking water supply alternatives to eliminate reliance on bottled water for field personnel. Joint Strike Fighter [JSF] Advance Procurement.--The fiscal year 2013 budget request includes: $65,000,000 for Navy JSF advance procurement, which equates to $16,200,000 per aircraft; $106,000,000 for Marine Corps advance procurement, which equates to $17,600,000 per aircraft; and $293,000,000 for Air Force advance procurement, which equates to $15,400,000 per aircraft. The Committee notes that the Navy and Marine Corp funding covers 12 months of advance procurement requirements whereas the Air Force funding covers only 8 to 9 months of advance procurement requirements. The Committee is concerned with the inconsistency in coverage of advance procurement requirements among the different variants and directs the program office to review the inconsistencies and make changes as necessary to fully fund advance procurement requirements. Diminishing Manufacturing Sources [DMS].--The Committee supports the Department's proactive approach to ensure the ability to sustain future production capabilities by addressing diminishing manufacturing sources but is concerned with increased DMS costs within a number of tactical missile procurement programs. For example, from fiscal year 2008 to fiscal year 2013, DMS costs within the Advanced Medium Range Air-to-Air Missile [AMRAAM] program in the Weapons Procurement, Navy and Missile Procurement, Air Force accounts increased fourfold. The Navy's Standard Missile 6 [SM-6] program is also reporting increases in DMS costs due to the end of Standard Missile 2 [SM-2] production and a reduced procurement of common components shared between SM-6 and SM-2. In fiscal year 2013, the Air Force's Joint Air-to-Surface Standoff Missile [JASSM] began to evaluate DMS and obsolescence issues, indicating the potential for future increases in DMS costs. Given the cross-cutting nature of this supplier issue, the Committee directs the Departments of the Navy and the Air Force to conduct a comprehensive review of the management of DMS within tactical missile procurement programs. This report shall include identification of the cost drivers for DMS within these programs, a discussion of the common suppliers, a comparison of DMS costs and approaches to funding among tactical missile programs, and the impact of declining foreign military sales on DMS costs. This report shall be submitted not later than 180 days after enactment of this act. In addition, the Committee directs the Departments of the Navy and the Air Force to report DMS costs separately from missile unit cost analysis to enhance the Committee's ability to oversee these costs. Ordnance Plant Recapitalization.--The Committee notes that the Department of Defense [DOD] does not have a long-term strategic capital improvement plan in place to support its aging ordnance plants. These facilities are supporting a multitude of DOD requirements, yet these activities could be disrupted if basic infrastructure needs, such as heating and cooling, safety, and environmental hazards, are not addressed in the near future. Therefore, the Committee directs the Secretary of Defense to submit a multiyear recapitalization plan for the ordnance plants, including the industrial reserve, to the congressional defense committees not later than 90 days after enactment of this act. The Committee encourages the Department to include the required funds in future budget requests based on the most urgent needs identified. Special Material Decoys.--Special Material Decoys [SMDs] have been credited with saving the lives of countless service men and women as well as over 100 U.S. and coalition aircraft in Operation Enduring Freedom alone. The Committee encourages the Secretary of Defense to adequately resource the production and research and development of these decoys. Additionally, the Committee encourages the services to coordinate their purchases of such decoys so as to maximize efficiencies of scale and avoid production breaks. Advanced Medium Range Air-to-Air Missile [AMRAAM].--The Committee recommends a reduction of $38,324,000 for the procurement of AMRAAM in the Weapons Procurement, Navy and Missile Procurement, Air Force accounts and a rescission of $60,334,000 from prior year appropriations. The recommendation fully funds the requested quantity of 180 missiles. However, due to lower than expected unit costs negotiated in the Lot 26 contract award, the program has excess prior year funding and the fiscal year 2013 request is excess to the requirement. Small Tactical Unmanned Aircraft System [STUAS]/RQ-21 UAS.--The initial requirement for the STUAS program was derived from Urgent Universal Needs Statements issued in 2004 and 2005. The program has an approved Capability Development Document from 2008, but no approved Capability Production Document. Milestone C is currently scheduled for the second quarter of fiscal year 2013 after a recent 4-month delay in the program. The program states that the delay to Milestone C will not impact the delivery of initial operational capability [IOC] because the schedule risk will be mitigated by beginning test events early and combining developmental and operational test events. The Committee recommends the Joint Requirements Oversight Council [JROC] review this program since its requirements and costs have not been validated. Furthermore, the Committee is concerned with the recent schedule compression and concurrency between developmental testing and planned production. Moreover, the current program schedule shows Milestone C occurring before the operational testing final report is complete. The Committee recommends Milestone C occur after the final test report is issued to ensure the decision to move into production is fully informed. The Committee also urges the Department of the Navy Service Acquisition Executive to review the strategy, schedule, and test plans for this program. Due to the schedule risk and program concurrency, the Committee fully funds research and development but provides no procurement funds in fiscal year 2013. Aircraft Procurement, Army Appropriations, 2012.................................... $5,360,334,000 Budget estimate, 2013................................... 5,853,729,000 House allowance......................................... 6,115,226,000 Committee recommendation................................ 5,414,061,000 The Committee recommends an appropriation of $5,414,061,000. This is $439,668,000 below the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [Dollars in thousands] ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Change from Change from Line Item Qty. 2013 budget Qty. House allowance Qty. Committee --------------------------------------------------- estimate recommendation Qty. Budget estimate Qty. House allowance ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ AIRCRAFT PROCUREMENT, ARMY AIRCRAFT FIXED WING 1 UTILITY F/W CARGO AIRCRAFT 2 $18,639 2 $18,639 2 $16,439 ....... -$2,200 ....... -$2,200 3 MQ-1 UAV 19 518,088 19 518,088 ....... ............... -19 -518,088 -19 -518,088 4 RQ-11 (RAVEN) 234 25,798 234 25,798 ....... ............... -234 -25,798 -234 -25,798 ROTARY 6 HELICOPTER, LIGHT UTILITY [LUH] 34 271,983 37 295,980 35 271,983 +1 ............... -2 -23,997 7 AH-64 APACHE BLOCK IIIA REMAN 40 577,115 40 577,115 40 507,115 ....... -70,000 ....... -70,000 8 AH-64 APACHE BLOCK IIIA REMAN (AP-CY) ....... 107,707 ....... 107,707 ....... 98,807 ....... -8,900 ....... -8,900 9 AH-64 APACHE BLOCK IIIB NEW BUILD 8 153,993 8 153,993 12 295,993 +4 +142,000 +4 +142,000 10 AH-64 APACHE BLOCK IIIB NEW BUILD (AP-CY) ....... 146,121 ....... 146,121 ....... 130,421 ....... -15,700 ....... -15,700 13 UH-60 BLACKHAWK (MYP) 59 1,107,087 69 1,306,087 62 1,166,787 +3 +59,700 -7 -139,300 14 UH-60 BLACKHAWK (MYP) (AP-CY) ....... 115,113 ....... 115,113 ....... 115,113 ....... ............... ....... ............... 15 CH-47 HELICOPTER 38 1,076,036 38 1,076,036 46 1,252,036 +8 +176,000 +8 +176,000 16 CH-47 HELICOPTER (AP-CY) ....... 83,346 ....... 83,346 ....... 83,346 ....... ............... ....... ............... ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, AIRCRAFT ....... 4,201,026 ....... 4,424,023 ....... 3,938,040 ....... -262,986 ....... -485,983 MODIFICATION OF AIRCRAFT 18 MQ-1 PAYLOAD--UAS ....... 231,508 ....... 231,508 ....... ............... ....... -231,508 ....... -231,508 20 GUARDRAIL MODS (MIP) ....... 16,272 ....... 16,272 ....... 16,272 ....... ............... ....... ............... 21 MULTI SENSOR ABN RECON (MIP) ....... 4,294 ....... 4,294 ....... 4,294 ....... ............... ....... ............... 22 AH-64 MODS ....... 178,805 ....... 178,805 ....... 178,805 ....... ............... ....... ............... 23 CH-47 CARGO HELICOPTER MODS ....... 39,135 ....... 57,635 ....... 87,935 ....... +48,800 ....... +30,300 24 UTILITY/CARGO AIRPLANE MODS ....... 24,842 ....... 24,842 ....... 24,842 ....... ............... ....... ............... 26 UTILITY HELICOPTER MODS ....... 73,804 ....... 93,804 ....... 283,804 ....... +210,000 ....... +190,000 27 KIOWA WARRIOR ....... 192,484 ....... 192,484 ....... 83,584 ....... -108,900 ....... -108,900 29 NETWORK AND MISSION PLAN ....... 190,789 ....... 190,789 ....... 190,789 ....... ............... ....... ............... 30 COMMS, NAV SURVEILLANCE ....... 133,191 ....... 133,191 ....... 133,191 ....... ............... ....... ............... 31 GATM ROLLUP ....... 87,280 ....... 87,280 ....... 87,280 ....... ............... ....... ............... 32 RQ-7 UAV MODS ....... 104,339 ....... 104,339 ....... 9,265 ....... -95,074 ....... -95,074 ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, MODIFICATION OF AIRCRAFT ....... 1,276,743 ....... 1,315,243 ....... 1,100,061 ....... -176,682 ....... -215,182 SUPPORT EQUIPMENT AND FACILITIES GROUND SUPPORT AVIONICS 34 AIRCRAFT SURVIVABILITY EQUIPMENT ....... 34,037 ....... 34,037 ....... 34,037 ....... ............... ....... ............... 36 CMWS ....... 127,751 ....... 127,751 ....... 127,751 ....... ............... ....... ............... OTHER SUPPORT 37 AVIONICS SUPPORT EQUIPMENT ....... 4,886 ....... 4,886 ....... 4,886 ....... ............... ....... ............... 38 COMMON GROUND EQUIPMENT ....... 82,511 ....... 82,511 ....... 82,511 ....... ............... ....... ............... 39 AIRCREW INTEGRATED SYSTEMS ....... 77,381 ....... 77,381 ....... 77,381 ....... ............... ....... ............... 40 AIR TRAFFIC CONTROL ....... 47,235 ....... 47,235 ....... 47,235 ....... ............... ....... ............... 41 INDUSTRIAL FACILITIES ....... 1,643 ....... 1,643 ....... 1,643 ....... ............... ....... ............... 42 LAUNCHER, 2.75 ROCKET 464 516 464 516 464 516 ....... ............... ....... ............... ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, SUPPORT EQUIPMENT AND FACILITIES ....... 375,960 ....... 375,960 ....... 375,960 ....... ............... ....... ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, AIRCRAFT PROCUREMENT, ARMY ....... 5,853,729 ....... 6,115,226 ....... 5,414,061 ....... -439,668 ....... -701,165 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ COMMITTEE RECOMMENDED ADJUSTMENTS The following table details the adjustments recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ 1Utility F/W 18,639 16,439 -2,200 Aircraft Test funding .............. .............. -2,200 early to need 3MQ-1 UAV 518,088 .............. -518,088 Transfer to .............. .............. -414,088 Title IX Schedule .............. .............. -104,000 delays and prior year unobligated balances 4RQ-11 (RAVEN) 25,798 .............. -25,798 Transfer to .............. .............. -25,798 Title IX 6Helicopter, Light 271,983 271,983 .............. Utility [LUH] Unjustified .............. .............. -8,000 economic change orders [ECO] cost growth--trans fer to replace National Guard training loss National Guard .............. .............. +8,000 training loss--transfe rred from ECO cost growth 7AH-64 Apache Block 577,115 507,115 -70,000 IIIA Reman Unjustified .............. .............. -70,000 unit cost increase 8AH-64 Apache Block 107,707 98,807 -8,900 IIIA Reman [AP- CY] Excess advance .............. .............. -8,900 procurement 9AH-64 Apache Block 153,993 295,993 +142,000 IIIB New Build Additional .............. .............. +142,000 Apache aircraft (4) 10AH-64 Apache Block 146,121 130,421 -15,700 IIIB New Build [AP-CY] Excess advance .............. .............. -15,700 procurement 13UH-60 Blackhawk M 1,107,087 1,166,787 +59,700 Model [MYP] UH-60s- 3 .............. .............. +59,700 additional aircraft 15CH-47 Helicopter 1,076,036 1,252,036 +176,000 CH-47s--8 .............. .............. +176,000 additional aircraft 18MQ-1 Payload--UAS 231,508 .............. -231,508 Transfer to .............. .............. -184,608 Title IX Army requested .............. .............. -46,900 transfer to Army RDT&E Line 131 for EMAARS 23CH-47 Cargo 39,135 87,935 +48,800 Helicopter Mods [MYP] CH-47 Cargo On/ .............. .............. +48,800 Off Loading System 26Utility Helicopter 73,804 283,804 +210,000 Mods UH-60 A to L .............. .............. +210,000 conversions for ARNG 27Kiowa Warrior Mods 192,484 83,584 -108,900 Reduce the OH- .............. .............. -37,200 58 Recap Reduce cockpit .............. .............. -71,700 and sensor upgrade program--mile stone C slipped to fiscal year 2015--early to need 32RQ-7 UAV MODS 104,339 9,265 -95,074 Ahead of need .............. .............. -95,074 ------------------------------------------------------------------------ MQ-1C Gray Eagle.--The fiscal year 2013 budget request includes $518,088,000 to procure 19 additional MQ-1C aircraft. Since fiscal year 2012, the program has experienced several testing delays, reliability issues and is not currently meeting the operational availability key performance parameters. The Army has procured 84 of the planned 135 production aircraft, or about 62 percent of the planned procurement, yet has not completed its initial phase of testing. Therefore, the Committee recommends a reduction of $104,000,000 and four aircraft to maintain a quantity consistent with full rate production regulations. AH-64 Apache Block IIIA Remanufacture.--The fiscal year 2013 budget request includes $577,115,000 to procure 40 remanufactured helicopters and $107,707,000 for advance procurement for the subsequent lot of helicopters. The gross weapon system unit cost for these helicopters increased from $14,800,000 in fiscal year 2012 request to $19,200,000 in fiscal year 2013 request. The justification documents provided no justification for these cost increases. Therefore, the Committee recommends a reduction of $70,000,000 to the procurement request due to unjustified cost growth. Furthermore, the Committee recommends a reduction of $8,900,000 for the advance procurement request, in line with fiscal year 2012 funding levels. Kiowa Warrior Modifications.--The fiscal year 2013 request includes $192,484,000 to procure Kiowa Warrior modifications. The Committee notes funds are not needed in fiscal year 2013 since production has been delayed until fiscal year 2015. Therefore, the Committee recommends a reduction of $108,900,000 in the base request for Kiowa Warrior modifications. The Committee also recommends a reduction of $78,000,000 and seven aircraft, which maintains fiscal year 2012 levels. Since termination of the Armed Reconnaissance Helicopter program in 2008, the Army has continually reviewed and discussed alternatives for replacing the Kiowa Warrior Helicopter. The Army is now planning to conduct a Voluntary Flight Demonstration [VFD] to evaluate options for fulfilling the Armed Scout requirement. The Committee directs the Department of the Army to complete the VFD and define the way ahead for its Armed Scout requirement to the congressional defense committees prior to obligating fiscal year 2013 replacement aircraft funding. RQ-7 Unmanned Aerial Vehicle [UAV] Modifications.--The fiscal year 2013 request includes $104,339,000 for modifications to the RQ-7 UAV. As of May 2012, the program had over $404,000,000 of fiscal year 2011 funding unobligated and all of the fiscal year 2012 funding unobligated. Therefore, the Committee recommends a reduction of $95,074,000. Missile Procurement, Army Appropriations, 2012.................................... $1,461,223,000 Budget estimate, 2013................................... 1,302,689,000 House allowance......................................... 1,602,689,000 Committee recommendation................................ 1,429,665,000 The Committee recommends an appropriation of $1,429,665,000. This is $126,976,000 above the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [Dollars in thousands] ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Change from Change from Line Item Qty. 2013 budget Qty. House allowance Qty. Committee --------------------------------------------------- estimate recommendation Qty. Budget estimate Qty. House allowance ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ MISSILE PROCUREMENT, ARMY OTHER MISSILES SURFACE-TO-AIR MISSILE SYSTEM 1 PATRIOT SYSTEM SUMMARY 84 $646,590 84 $946,590 134 $840,822 +50 +$194,232 +50 -$105,768 2 MSE MISSILE ....... 12,850 ....... 12,850 ....... 9,350 ....... -3,500 ....... -3,500 AIR-TO-SURFACE MISSILE SYSTEM 4 HELLFIRE SYS SUMMARY ....... 1,401 ....... 1,401 ....... 1,401 ....... ............... ....... ............... ANTI-TANK/ASSAULT MISSILE SYSTEM 5 JAVELIN (AAWS-M) SYSTEM SUMMARY 400 81,121 400 81,121 400 81,121 ....... ............... ....... ............... 6 TOW 2 SYSTEM SUMMARY 1,403 64,712 1,403 64,712 1,403 64,712 ....... ............... ....... ............... 7 TOW 2 SYSTEM SUMMARY (AP-CY) ....... 19,931 ....... 19,931 ....... 19,931 ....... ............... ....... ............... 8 GUIDED MLRS ROCKET [GMLRS] 1,608 218,679 1,608 218,679 1,608 207,423 ....... -11,256 ....... -11,256 9 MLRS REDUCED RANGE PRACTICE ROCKETS [RRPR] 2,430 18,767 2,430 18,767 2,430 16,267 ....... -2,500 ....... -2,500 10 HIGH MOBILITY ARTILLERY ROCKET SYSTEM ....... 12,051 ....... 12,051 ....... 12,051 ....... ............... ....... ............... ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, OTHER MISSILES ....... 1,076,102 ....... 1,376,102 ....... 1,253,078 ....... +176,976 ....... -123,024 MODIFICATION OF MISSILES MODIFICATIONS 11 PATRIOT MODS ....... 199,565 ....... 199,565 ....... 149,565 ....... -50,000 ....... -50,000 13 MLRS MODS ....... 2,466 ....... 2,466 ....... 2,466 ....... ............... ....... ............... 14 HIMARS MODIFICATIONS ....... 6,068 ....... 6,068 ....... 6,068 ....... ............... ....... ............... ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, MODIFICATION OF MISSILES ....... 208,099 ....... 208,099 ....... 158,099 ....... -50,000 ....... -50,000 SPARES AND REPAIR PARTS 16 SPARES AND REPAIR PARTS ....... 7,864 ....... 7,864 ....... 7,864 ....... ............... ....... ............... SUPPORT EQUIPMENT AND FACILITIES 17 AIR DEFENSE TARGETS ....... 3,864 ....... 3,864 ....... 3,864 ....... ............... ....... ............... 18 ITEMS LESS THAN $5.0M (MISSILES) ....... 1,560 ....... 1,560 ....... 1,560 ....... ............... ....... ............... 19 PRODUCTION BASE SUPPORT ....... 5,200 ....... 5,200 ....... 5,200 ....... ............... ....... ............... ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, SUPPORT EQUIPMENT AND FACILITIES ....... 10,624 ....... 10,624 ....... 10,624 ....... ............... ....... ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, MISSILE PROCUREMENT, ARMY ....... 1,302,689 ....... 1,602,689 ....... 1,429,665 ....... +126,976 ....... -173,024 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ COMMITTEE RECOMMENDED ADJUSTMENTS The following table details the adjustments recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ 2013 budget Committee Change from Line Item estimate recommendation budget request ------------------------------------------------------------------------ 1 Patriot System 646,590 840,822 +194,232 Summary Program .............. ............... +194,232 Adjustmen t to Meet Army Shortfall 2 MSE Missile 12,850 9,350 -3,500 Excess to .............. ............... -3,500 Requireme nt 8 Guided MLRS 218,679 207,423 -11,256 Rocket [GMLRS] Unit Cost .............. ............... -11,256 Efficienc ies 9 MLRS Reduced 18,767 16,267 -2,500 Range Practice Rockets [RRPR] Unit Cost .............. ............... -2,500 Efficienc ies 11 Patriot Mods 199,565 149,565 -50,000 Radar .............. ............... -50,000 Digital Processor Program Delay ------------------------------------------------------------------------ Procurement of Weapons and Tracked Combat Vehicles, Army Appropriations, 2012.................................... $2,070,405,000 Budget estimate, 2013................................... 1,501,706,000 House allowance......................................... 1,884,706,000 Committee recommendation................................ 1,687,823,000 The Committee recommends an appropriation of $1,687,823,000. This is $186,117,000 above the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [Dollars in thousands] ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Change from Change from Line Item Qty. 2013 budget Qty. House allowance Qty. Committee ------------------------------------------------------- estimate recommendation Qty. Budget estimate Qty. House allowance ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ PROCUREMENT OF W&TCV, ARMY TRACKED COMBAT VEHICLES 1 STRYKER VEHICLE 58 $286,818 58 $286,818 58 $286,818 ......... ............... ......... ............... MODIFICATION OF TRACKED COMBAT VEHICLES 3 STRYKER (MOD) ....... 60,881 ....... 60,881 ....... 60,881 ......... ............... ......... ............... 4 FIST VEHICLE (MOD) ....... 57,257 ....... 57,257 ....... 57,257 ......... ............... ......... ............... 5 BRADLEY PROGRAM (MOD) ....... 148,193 ....... 288,193 ....... 148,193 ......... ............... ......... -$140,000 6 HOWITZER, MED SP FT 155MM M109A6 (MOD) ....... 10,341 ....... 10,341 ....... 7,641 ......... -$2,700 ......... -2,700 7 PALADIN PIPM MOD IN SERVICE 17 206,101 17 206,101 17 206,101 ......... ............... ......... ............... 8 IMPROVED RECOVERY VEHICLE (M88A2 HERCU- LES) 31 107,909 49 169,909 31 230,909 ......... +123,000 -18 +61,000 9 ARMORED BREACHER VEHICLE 10 50,039 10 50,039 10 50,039 ......... ............... ......... ............... 10 M88 FOV MODS ....... 29,930 ....... 29,930 ....... 29,930 ......... ............... ......... ............... 11 M1 ABRAMS TANK (MOD) ....... 129,090 ....... 129,090 ....... 129,090 ......... ............... ......... ............... 12 ABRAMS UPGRADE PROGRAM 21 74,433 21 255,433 21 165,433 ......... +91,000 ......... -90,000 SUPPORT EQUIPMENT AND FACILITIES 13 PRODUCTION BASE SUPPORT (TCV-WTCV) ....... 1,145 ....... 1,145 ....... 1,145 ......... ............... ......... ............... --------------------------------------------------------------------------------------------------------------------------------------- TOTAL, TRACKED COMBAT VEHICLES ....... 1,162,137 ....... 1,545,137 ....... 1,373,437 ......... +211,300 ......... -171,700 WEAPONS AND OTHER COMBAT VEHICLES 14 INTEGRATED AIR BURST WEAPON SYS FAMILY ....... 506 ....... 506 ....... 506 ......... ............... ......... ............... 17 LIGHTWEIGHT .50 CALIBER MACHINE GUN 610 25,183 610 25,183 ....... ............... -610 -25,183 -610 -25,183 19 MORTAR SYSTEMS ....... 8,104 ....... 8,104 ....... 8,104 ......... ............... ......... ............... 21 XM320 GRENADE LAUNCHER MODULE [GLM] 2,280 14,096 2,280 14,096 2,280 14,096 ......... ............... ......... ............... 24 M4 CARBINE 12,000 21,272 12,000 21,272 12,000 21,272 ............... ......... ............... ......... 25 SHOTGUN, MODULAR ACCESSORY SYSTEM [MASS] 2,107 6,598 2,107 6,598 2,107 6,598 ......... ............... ......... ............... 26 COMMON REMOTELY OPERATED WEAPONS STA- TION 240 56,725 240 56,725 240 56,725 ......... ............... ......... ............... 27 HOWITZER LT WT 155MM (T) ....... 13,827 ....... 13,827 ....... 13,827 ......... ............... ......... ............... MOD OF WEAPONS AND OTHER COMBAT VEH 29 M777 MODS ....... 26,843 ....... 26,843 ....... 26,843 ......... ............... ......... ............... 30 M4 CARBINE MODS ....... 27,243 ....... 27,243 ....... 27,243 ......... ............... ......... ............... 31 M2 50 CAL MACHINE GUN MODS ....... 39,974 ....... 39,974 ....... 39,974 ......... ............... ......... ............... 32 M249 SAW MACHINE GUN MODS ....... 4,996 ....... 4,996 ....... 4,996 ......... ............... ......... ............... 33 M240 MEDIUM MACHINE GUN MODS ....... 6,806 ....... 6,806 ....... 6,806 ......... ............... ......... ............... 34 SNIPER RIFLES MODIFICATIONS ....... 14,113 ....... 14,113 ....... 14,113 ......... ............... ......... ............... 35 M119 MODIFICATIONS ....... 20,727 ....... 20,727 ....... 20,727 ......... ............... ......... ............... 36 M16 RIFLE MODS ....... 3,306 ....... 3,306 ....... 3,306 ......... ............... ......... ............... 37 MODIFICATIONS LESS THAN $5.0M (WOCV-WTCV) ....... 3,072 ....... 3,072 ....... 3,072 ......... ............... ......... ............... SUPPORT EQUIPMENT AND FACILITIES 38 ITEMS LESS THAN $5.0M (WOCV-WTCV) ....... 2,026 ....... 2,026 ....... 2,026 ......... ............... ......... ............... 39 PRODUCTION BASE SUPPORT (WOCV-WTCV) ....... 10,115 ....... 10,115 ....... 10,115 ......... ............... ......... ............... 40 INDUSTRIAL PREPAREDNESS ....... 442 ....... 442 ....... 442 ......... ............... ......... ............... 41 SMALL ARMS EQUIPMENT (SOLDIER ENH PROG) ....... 2,378 ....... 2,378 ....... 2,378 ......... ............... ......... ............... --------------------------------------------------------------------------------------------------------------------------------------- TOTAL, WEAPONS AND OTHER COMBAT VEHICLES ....... 308,352 ....... 308,352 ....... 283,169 ......... -25,183 ......... -25,183 SPARE AND REPAIR PARTS 42 SPARES AND REPAIR PARTS (WTCV) ....... 31,217 ....... 31,217 ....... 31,217 ......... ............... ......... ............... --------------------------------------------------------------------------------------------------------------------------------------- TOTAL, PROCUREMENT OF W&TCV, ARMY ....... 1,501,706 ....... 1,884,706 ....... 1,687,823 ......... +186,117 ......... -196,883 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ COMMITTEE RECOMMENDED ADJUSTMENTS The following table details the adjustments recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ 2013 budget Committee Change from Line Item estimate recommendation budget request ------------------------------------------------------------------------ 6Howitzer, Med 10,341 7,641 -2,700 Sp Ft 155mm M109a6 (MOD) Unjustified ............... ............... -2,700 increase in contractor support 8Improved 107,909 230,909 +123,000 Recovery Vehicle (M88a2 Hercules) Authorizati ............... ............... +123,000 on Increase 12Abrams Upgrade 74,433 165,433 +91,000 Program Authorizati ............... ............... +91,000 on Increase 17Lightweight .50 25,183 ............... -25,183 Caliber Machine Gun Program ............... ............... -25,183 cancellati on by Army ------------------------------------------------------------------------ Procurement of Ammunition, Army Appropriations, 2012.................................... $1,884,424,000 Budget estimate, 2013................................... 1,739,706,000 House allowance......................................... 1,576,768,000 Committee recommendation................................ 1,624,380,000 The Committee recommends an appropriation of $1,624,380,000. This is $115,326,000 below the budget estimate. committee recommended program The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [Dollars in thousands] ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Change from Change from Line Item Qty. 2013 budget Qty. House allowance Qty. Committee --------------------------------------------------- estimate recommendation Qty. Budget estimate Qty. House allowance ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ PROCUREMENT OF AMMUNITION, ARMY AMMUNITION SMALL/MEDIUM CAL AMMUNITION 1 CTG, 5.56MM, ALL TYPES ....... $158,313 ....... $123,513 ....... $158,313 ....... ............... ....... +$34,800 2 CTG, 7.62MM, ALL TYPES ....... 91,438 ....... 91,438 ....... 91,438 ....... ............... ....... ............... 3 CTG, HANDGUN, ALL TYPES ....... 8,954 ....... 8,954 ....... 8,954 ....... ............... ....... ............... 4 CTG, .50 CAL, ALL TYPES ....... 109,604 ....... 109,604 ....... 109,604 ....... ............... ....... ............... 5 CTG, 20MM, ALL TYPES ....... 4,041 ....... 4,041 ....... 4,041 ....... ............... ....... ............... 6 CTG, 25MM, ALL TYPES ....... 12,654 ....... 12,654 ....... 12,654 ....... ............... ....... ............... 7 CTG, 30MM, ALL TYPES ....... 72,154 ....... 54,154 ....... 52,154 ....... -$20,000 ....... -2,000 8 CTG, 40MM, ALL TYPES ....... 60,138 ....... ............... ....... 60,138 ....... ............... ....... +60,138 MORTAR AMMUNITION 9 D60MM MORTAR, ALL TYPES ....... 44,375 ....... 44,375 ....... 44,375 ....... ............... ....... ............... 10 D81MM MORTAR, ALL TYPES ....... 27,471 ....... 27,471 ....... 27,471 ....... ............... ....... ............... 11 D120MM MORTAR, ALL TYPES ....... 87,811 ....... 87,811 ....... 87,811 ....... ............... ....... ............... TANK AMMUNITION 12 CTG TANK 105MM AND 120MM: ALL TYPES ....... 112,380 ....... 112,380 ....... 112,380 ....... ............... ....... ............... ARTILLERY AMMUNITION 13 CTG, ARTY, 75MM AND 105MM: ALL TYPES ....... 50,861 ....... 50,861 ....... 50,861 ....... ............... ....... ............... 14 ARTILLERY PROJECTILE, 155MM, ALL TYPES ....... 26,227 ....... 26,227 ....... 26,227 ....... ............... ....... ............... 15 PROJ 155MM EXTENDED RANGE XM982 ....... 110,329 ....... 60,329 ....... 15,003 ....... -95,326 ....... -45,326 16 ARTILLERY PROPELLANTS, FUZES AND PRIMERS, ALL TYPES ....... 43,924 ....... 43,924 ....... 43,924 ....... ............... ....... ............... MINES 17 MINES AND CLEARING CHARGE, ALL TYPES ....... 3,775 ....... 3,775 ....... 3,775 ....... ............... ....... ............... NETWORKED MUNITIONS 18 SPIDER NETWORK MUNITIONS, ALL TYPES ....... 17,408 ....... 17,408 ....... 17,408 ....... ............... ....... ............... ROCKETS 19 SHOULDER LAUNCHED MUNITIONS, ALL TYPES ....... 1,005 ....... 1,005 ....... 1,005 ....... ............... ....... ............... 20 ROCKET, HYDRA 70, ALL TYPES ....... 123,433 ....... 123,433 ....... 123,433 ....... ............... ....... ............... OTHER AMMUNITION 21 DEMOLITION MUNITIONS, ALL TYPES ....... 35,189 ....... 35,189 ....... 35,189 ....... ............... ....... ............... 22 GRENADES, ALL TYPES ....... 33,477 ....... 33,477 ....... 33,477 ....... ............... ....... ............... 23 SIGNALS, ALL TYPES ....... 9,991 ....... 9,991 ....... 9,991 ....... ............... ....... ............... 24 SIMULATORS, ALL TYPES ....... 10,388 ....... 10,388 ....... 10,388 ....... ............... ....... ............... MISCELLANEOUS 25 AMMO COMPONENTS, ALL TYPES ....... 19,383 ....... 19,383 ....... 19,383 ....... ............... ....... ............... 26 NON-LETHAL AMMUNITION, ALL TYPES ....... 7,336 ....... 7,336 ....... 7,336 ....... ............... ....... ............... 27 CAD/PAD ALL TYPES ....... 6,641 ....... 6,641 ....... 6,641 ....... ............... ....... ............... 28 ITEMS LESS THAN $5 MILLION ....... 15,092 ....... 15,092 ....... 15,092 ....... ............... ....... ............... 29 AMMUNITION PECULIAR EQUIPMENT ....... 15,692 ....... 15,692 ....... 15,692 ....... ............... ....... ............... 30 FIRST DESTINATION TRANSPORTATION (AMMO) ....... 14,107 ....... 14,107 ....... 14,107 ....... ............... ....... ............... 31 CLOSEOUT LIABILITIES ....... 106 ....... 106 ....... 106 ....... ............... ....... ............... ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, AMMUNITION ....... 1,333,697 ....... 1,170,759 ....... 1,218,371 ....... -115,326 ....... +47,612 AMMUNITION PRODUCTION BASE SUPPORT PRODUCTION BASE SUPPORT 32 PROVISION OF INDUSTRIAL FACILITIES ....... 220,171 ....... 220,171 ....... 220,171 ....... ............... ....... ............... 33 CONVENTIONAL MUNITIONS DEMILITARIZATION, ALL ....... 182,461 ....... 182,461 ....... 182,461 ....... ............... ....... ............... 34 ARMS INITIATIVE ....... 3,377 ....... 3,377 ....... 3,377 ....... ............... ....... ............... ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, AMMUNITION PRODUCTION BASE SUPPORT ....... 406,009 ....... 406,009 ....... 406,009 ....... ............... ....... ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, PROCUREMENT OF AMMUNITION, ARMY ....... 1,739,706 ....... 1,576,768 ....... 1,624,380 ....... -115,326 ....... +47,612 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ COMMITTEE RECOMMENDED ADJUSTMENTS The following table details the adjustments recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ 2013 budget Committee Change from Line Item estimate recommendation budget request ------------------------------------------------------------------------ 7Ctg, 30mm, All 72,154 52,154 -20,000 Types Army requested .............. .............. -18,000 transfer to Title IX: Aircraft Procurement, Army Line 13 Excess .............. .............. -2,000 nonrecurring engineering 15Proj 155mm 110,329 15,003 -95,326 Extended Range XM982 Contract award .............. .............. -95,326 delays ------------------------------------------------------------------------ Excalibur XM982.--The Committee notes that the Increment 1b Milestone C decision has been delayed 6 months due to a 2010 Nunn-McCurdy evaluation and technical difficulties during design and testing. The Army plans on awarding the first production contract for the 1b variant in December 2012 using fiscal year 2012 funds. The fiscal year 2013 budget requests $95,326,000 to award the second 1b production contract only 6 months later in June 2013. Under this plan, 82 percent of the total planned procurement would be under contract about 6 months before the delivery of the first production lot and 9 months before the anticipated full-rate production decision in March 2014. The Committee agrees with the Government Accountability Office's recommendation to delay the award of the second production lot until after the delivery of the initial production lot in December 2013 in order to allow more time to identify and correct any testing issues before significantly ramping up production. Therefore, the Committee recommends a reduction of $95,326,000 in the base request and $12,300,000 in the OCO request. Saboted Light Armor Penetrator Ammunition.--The Committee is aware of the Army's decision to end production of M903 and M962 armor-penetrating .50 caliber ammunition used during combat operations. Within 120 days of enactment of this act, the Secretary of the Army shall provide the congressional defense committees a report on the health of the U.S. industrial base with regard to the production capabilities for this highly effective ammunition. This report should include analyses of the consequences of a possible production line shutdown and effects on second and third tier suppliers. Other Procurement, Army Appropriations, 2012.................................... $7,924,214,000 Budget estimate, 2013................................... 6,326,245,000 House allowance......................................... 6,488,045,000 Committee recommendation................................ 4,980,209,000 The Committee recommends an appropriation of $4,980,209,000. This is $1,346,036,000 below the budget estimate. committee recommended program The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [Dollars in thousands] ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Change from Change from Line Item Qty. 2013 budget Qty. House allowance Qty. Committee ----------------------------------------------------- estimate recommendation Qty. Budget estimate Qty. House allowance ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ OTHER PROCUREMENT, ARMY TACTICAL AND SUPPORT VEHICLES TACTICAL VEHICLES 1 SEMITRAILERS, FLATBED 27 $7,097 27 $7,097 27 $7,097 ........ ............... ........ ............... 2 FAMILY OF MEDIUM TACTICAL VEH [FMTV] 1,248 346,115 1,248 346,115 1,248 339,515 ........ -$6,600 ........ -$6,600 3 FIRETRUCKS & ASSOCIATED FIREFIGHTING EQUIP- MENT ....... 19,292 ....... 19,292 ....... 19,292 ........ ............... ........ ............... 4 FAMILY OF HEAVY TACTICAL VEHICLES [FHTV] 1,534 52,933 1,534 52,933 1,534 52,933 ........ ............... ........ ............... 5 PLS ESP ....... 18,035 ....... 18,035 ....... 18,035 ........ ............... ........ ............... 9 TRUCK, TRACTOR, LINE HAUL, M915/M916 12 3,619 12 3,619 12 3,619 ........ ............... ........ ............... 10 HVY EXPANDED MOBILE TACTICAL TRUCK EXT SERV 60 26,859 60 26,859 60 26,859 ........ ............... ........ ............... 12 TACTICAL WHEELED VEHICLE PROTECTION KITS 950 69,163 950 69,163 950 69,163 ........ ............... ........ ............... 13 MODIFICATION OF IN SVC EQUIP ....... 91,754 ....... 91,754 ....... 91,754 ........ ............... ........ ............... NON-TACTICAL VEHICLES 18 PASSENGER CARRYING VEHICLES ....... 2,548 ....... 2,548 ....... 2,548 ........ ............... ........ ............... 19 NONTACTICAL VEHICLES, OTHER ....... 16,791 ....... 16,791 ....... 11,791 ........ -5,000 ........ -5,000 ------------------------------------------------------------------------------------------------------------------------------------- TOTAL, TACTICAL AND SUPPORT VEHICLES ....... 654,206 ....... 654,206 ....... 642,606 ........ -11,600 ........ -11,600 COMMUNICATIONS AND ELECTRONICS EQUIPMENT COMM--JOINT COMMUNICATIONS 20 JOINT COMBAT IDENTIFICATION MARKING SYSTEM 7,038 10,061 7,038 10,061 7,038 8,961 ........ -1,100 ........ -1,100 21 WIN-T--GROUND FORCES TACTICAL NETWORK 2,166 892,635 2,166 892,635 2,166 511,720 ........ -380,915 ........ -380,915 22 SIGNAL MODERNIZATION PROGRAM ....... 45,626 ....... 45,626 ....... 45,626 ........ ............... ........ ............... 23 JCSE EQUIPMENT (USREDCOM) ....... 5,143 ....... 5,143 ....... 5,143 ........ ............... ........ ............... COMM--SATELLITE COMMUNICATIONS 24 DEFENSE ENTERPRISE WIDEBAND SATCOM SYSTEMS 23 151,636 23 151,636 23 151,636 ........ ............... ........ ............... 25 TRANSPORTABLE TACTICAL COMMAND COMMUNICATIONS ....... 6,822 ....... 6,822 ....... ............... ........ -6,822 ........ -6,822 26 SHF TERM ....... 9,108 ....... 9,108 ....... 9,108 ........ ............... ........ ............... 28 NAVSTAR GLOBAL POSITIONING SYSTEM (SPACE) 3,592 27,353 3,592 27,353 ....... 8,453 -3,952 -18,900 -3,592 -18,900 29 SMART-T (SPACE) ....... 98,656 ....... 98,656 ....... 14,040 ........ -84,616 ........ -84,616 31 GLOBAL BRDCST SVC--GBS ....... 47,131 ....... 47,131 ....... 47,131 ........ ............... ........ ............... 32 MOD OF IN-SVC EQUIP (TAC SAT) 39 23,281 39 23,281 39 23,281 ........ ............... ........ ............... COMM--C3 SYSTEM 34 ARMY GLOBAL CMD & CONTROL SYS [AGCCS] ....... 10,848 ....... 10,848 ....... 10,848 ........ ............... ........ ............... COMM--COMBAT COMMUNICATIONS 35 ARMY DATA DISTRIBUTION SYSTEM (DATA RADIO) ....... 979 ....... 979 ....... 979 ........ ............... ........ ............... 36 JOINT TACTICAL RADIO SYSTEM 11,059 556,250 11,059 556,250 8,765 366,250 -2,294 -190,000 -2,294 -190,000 37 MID-TIER NETWORKING VEHICULAR RADIO [MNVR] ....... 86,219 ....... 86,219 ....... 86,219 ........ ............... ........ ............... 38 RADIO TERMINAL SET, MIDS LVT(2) ....... 7,798 ....... 7,798 ....... 7,798 ........ ............... ........ ............... 39 SINCGARS FAMILY ....... 9,001 ....... 9,001 ....... 9,001 ........ ............... ........ ............... 40 AMC CRITICAL ITEMS--OPA2 108 24,601 108 24,601 108 24,601 ........ ............... ........ ............... 41 TRACTOR DESK ....... 7,779 ....... 7,779 ....... 2,579 ........ -5,200 ........ -5,200 43 SPIDER APLA REMOTE CONTROL UNIT ....... 34,365 ....... 24,365 ....... 34,365 ........ ............... ........ +10,000 44 SOLDIER ENHANCEMENT PROGRAM COMM/ELECTRONICS ....... 1,833 ....... 1,833 ....... ............... ........ -1,833 ........ -1,833 45 TACTICAL COMMUNICATIONS AND PROTECTIVE SYS- TEM ....... 12,984 ....... 12,984 ....... 12,984 ........ ............... ........ ............... 47 GUNSHOT DETECTION SYSTEM [GDS] 46 2,332 46 2,332 ....... ............... -46 -2,332 -46 -2,332 48 RADIO, IMPROVED HF (COTS) FAMILY ....... 1,132 ....... 1,132 ....... 1,132 ........ ............... ........ ............... 49 MEDICAL COMM FOR CBT CASUALTY CARE [MC4] 2,535 22,899 2,535 22,899 2,535 22,899 ........ ............... ........ ............... COMM--INTELLIGENCE COMM 51 CI AUTOMATION ARCHITECTURE (MIP) ....... 1,564 ....... 1,564 ....... 1,564 ........ ............... ........ ............... 52 RESERVE CA/MISO GPF EQUIPMENT ....... 28,781 ....... 28,781 ....... 28,781 ........ ............... ........ ............... INFORMATION SECURITY 53 TSEC--ARMY KEY MGT SYS [AKMS] 6,087 23,432 6,087 23,432 6,087 23,432 ........ ............... ........ ............... 54 INFORMATION SYSTEM SECURITY PROGRAM--ISSP 2,469 43,897 2,469 43,897 2,469 43,897 ........ ............... ........ ............... COMM--LONG HAUL COMMUNICATIONS 56 TERRESTRIAL TRANSMISSION ....... 2,891 ....... 2,891 ....... 2,891 ........ ............... ........ ............... 57 BASE SUPPORT COMMUNICATIONS ....... 13,872 ....... 13,872 ....... 13,872 ........ ............... ........ ............... 58 WW TECH CON IMP PROG [WWTCIP] ....... 9,595 ....... 9,595 ....... 9,595 ........ ............... ........ ............... COMM--BASE COMMUNICATIONS 59 INFORMATION SYSTEMS 164 142,133 164 142,133 164 131,133 ........ -11,000 ........ -11,000 61 INSTALLATION INFO INFRASTRUCTURE MOD PRO- GRAM ....... 57,727 ....... 57,727 ....... 57,727 ........ ............... ........ ............... 62 PENTAGON INFORMATION MGT AND TELECOM ....... 5,000 ....... 5,000 ....... 5,000 ........ ............... ........ ............... ELECT EQUIP ELECT EQUIP--TACT INT REL ACT [TIARA] 65 JTT/CIBS-M (MIP) ....... 1,641 ....... 1,641 ....... 1,641 ........ ............... ........ ............... 66 PROPHET GROUND (MIP) 13 48,797 13 48,797 13 48,797 ........ ............... ........ ............... 69 DCGS-A (MIP) 1,743 184,007 1,743 184,007 ....... ............... -1,743 -184,007 -1,743 -184,007 70 JOINT TACTICAL GROUND STATION [JTAGS] 5 2,680 5 2,680 5 2,680 ........ ............... ........ ............... 71 TROJAN (MIP) ....... 21,483 ....... 21,483 ....... 21,483 ........ ............... ........ ............... 72 MOD OF IN-SVC EQUIP (INTEL SPT) (MIP) ....... 2,412 ....... 2,412 ....... 2,412 ........ ............... ........ ............... 73 CI HUMINT AUTO REPRTING AND COLL [CHARCS] (MIP) ....... 7,077 ....... 7,077 ....... 7,077 ........ ............... ........ ............... ELECT EQUIP--ELECTRONIC WARFARE [EW] 75 LIGHTWEIGHT COUNTER MORTAR RADAR 43 72,594 43 72,594 43 72,594 ........ ............... ........ ............... 76 CREW ....... 15,446 ....... 15,446 ....... 15,446 ........ ............... ........ ............... 78 COUNTERINTELLIGENCE/SECURITY COUNTERMEAS- URES ....... 1,470 ....... 1,470 ....... 1,470 ........ ............... ........ ............... 79 CI MODERNIZATION (MIP) ....... 1,368 ....... 1,368 ....... 1,368 ........ ............... ........ ............... ELECT EQUIP--TACTICAL SURV [TAC SURV] 80 FAAD GBS ....... 7,980 ....... 7,980 ....... 7,980 ........ ............... ........ ............... 81 SENTINEL MODS 70 33,444 70 33,444 70 33,444 ........ ............... ........ ............... 82 SENSE THROUGH THE WALL [STTW] ....... 6,212 ....... 6,212 ....... ............... ........ -6,212 ........ -6,212 83 NIGHT VISION DEVICES 8,687 166,516 8,687 166,516 8,687 139,516 ........ -27,000 ........ -27,000 85 NIGHT VISION, THERMAL WPN SIGHT ....... 82,162 ....... 82,162 ....... 82,162 ........ ............... ........ ............... 86 SMALL TACTICAL OPTICAL RIFLE MOUNTED MLRF ....... 20,717 ....... 20,717 ....... 20,717 ........ ............... ........ ............... 89 GREEN LASER INTERDICTION SYSTEM ....... 1,014 ....... 1,014 ....... 1,014 ........ ............... ........ ............... 90 INDIRECT FIRE PROTECTION FAMILY OF SYSTEMS ....... 29,881 ....... 29,881 ....... 24,881 ........ -5,000 ........ -5,000 91 PROFILER 136 12,482 136 12,482 136 12,482 ........ ............... ........ ............... 92 MOD OF IN-SVC EQUIP (FIREFINDER RADARS) ....... 3,075 ....... 3,075 ....... 3,075 ........ ............... ........ ............... 94 JOINT BATTLE COMMAND--PLATFORM [JBC-P] ....... 141,385 ....... 141,385 ....... 141,385 ........ ............... ........ ............... 96 MOD OF IN-SERVICE EQUIPMENT (LLDR) ....... 22,403 ....... 42,203 ....... 88,403 ........ +66,000 ........ +46,200 98 MORTAR FIRE CONTROL SYSTEM ....... 29,505 ....... 29,505 ....... 21,705 ........ -7,800 ........ -7,800 99 COUNTERFIRE RADARS 13 244,409 13 244,409 ....... ............... -13 -244,409 -13 -244,409 100 ENHANCED SENSOR & MONITORING SYSTEM ....... 2,426 ....... 2,426 ....... 2,426 ........ ............... ........ ............... ELECT EQUIP--TACTICAL C2 SYSTEMS 101 TACTICAL OPERATIONS CENTERS 133 30,196 133 30,196 133 30,196 ........ ............... ........ ............... 102 FIRE SUPPORT C2 FAMILY 1,642 58,903 1,642 58,903 1,642 58,903 ........ ............... ........ ............... 103 BATTLE COMMAND SUSTAINMENT SUPPORT SYSTEM 445 8,111 445 8,111 445 8,111 ........ ............... ........ ............... 104 FAAD C2 ....... 5,031 ....... 5,031 ....... 5,031 ........ ............... ........ ............... 105 AIR & MSL DEFENSE PLANNING & CONTROL SYS [AMD] 12 64,144 12 64,144 12 64,144 ........ ............... ........ ............... 106 KNIGHT FAMILY ....... 11,999 ....... 11,999 ....... 11,999 ........ ............... ........ ............... 107 LIFE CYCLE SOFTWARE SUPPORT [LCSS] ....... 1,853 ....... 1,853 ....... 1,853 ........ ............... ........ ............... 108 AUTOMATIC IDENTIFICATION TECHNOLOGY ....... 14,377 ....... 14,377 ....... 14,377 ........ ............... ........ ............... 111 NETWORK MANAGEMENT INITIALIZATION AND SERV- ICE ....... 59,821 ....... 59,821 ....... ............... ........ -59,821 ........ -59,821 112 MANEUVER CONTROL SYSTEM [MCS] 721 51,228 721 51,228 721 51,228 ........ ............... ........ ............... 113 SINGLE ARMY LOGISTICS ENTERPRISE [SALE] 5,976 176,901 5,976 176,901 5,976 176,901 ........ ............... ........ ............... 114 RECONNAISSANCE AND SURVEYING INSTRUMENT SET ....... 15,209 ....... 15,209 ....... 15,209 ........ ............... ........ ............... ELECT EQUIP--AUTOMATION 115 ARMY TRAINING MODERNIZATION ....... 8,866 ....... 8,866 ....... 8,866 ........ ............... ........ ............... 116 AUTOMATED DATA PROCESSING EQUIPMENT ....... 129,438 ....... 129,438 ....... 129,438 ........ ............... ........ ............... 117 GENERAL FUND ENTERPRISE BUSINESS SYSTEM ....... 9,184 ....... 9,184 ....... 9,184 ........ ............... ........ ............... 118 CSS COMMUNICATIONS 2,062 20,639 2,062 20,639 2,062 20,639 ........ ............... ........ ............... 119 RESERVE COMPONENT AUTOMATION SYS [RCAS] ....... 35,493 ....... 35,493 ....... 35,493 ........ ............... ........ ............... ELECT EQUIP--AUDIO VISUAL SYS (A/V) 120 ITEMS LESS THAN $5.0M (A/V) ....... 8,467 ....... 8,467 ....... 8,467 ........ ............... ........ ............... 121 ITEMS LESS THAN $5M (SURVEYING EQUIPMENT) 89 5,309 89 5,309 89 5,309 ........ ............... ........ ............... ELECT EQUIP--SUPPORT 122 PRODUCTION BASE SUPPORT (C-E) ....... 586 ....... 586 ....... 586 ........ ............... ........ ............... ------------------------------------------------------------------------------------------------------------------------------------- TOTAL, COMMUNICATIONS AND ELECTRONICS EQUIPMENT ....... 4,303,705 ....... 4,313,505 ....... 3,132,738 ........ -1,170,967 ........ -1,180,767 OTHER SUPPORT EQUIPMENT CHEMICAL DEFENSIVE EQUIPMENT 126 FAMILY OF NON-LETHAL EQUIPMENT [FNLE] 1,562 3,960 1,562 3,960 ....... ............... -1,562 -3,960 -1,562 -3,960 127 BASE DEFENSE SYSTEMS [BDS] 637 4,374 637 4,374 637 4,374 ........ ............... ........ ............... 128 CBRN SOLDIER PROTECTION 219 9,259 219 9,259 219 9,259 ........ ............... ........ ............... BRIDGING EQUIPMENT 130 TACTICAL BRIDGING 7 35,499 7 35,499 ....... 2,961 -7 -32,538 -7 -32,538 131 TACTICAL BRIDGE, FLOAT-RIBBON 68 32,893 68 32,893 46 20,843 -22 -12,050 -22 -12,050 134 ROBOTIC COMBAT SUPPORT SYSTEM ....... 29,106 ....... 29,106 ....... ............... ........ -29,106 ........ -29,106 135 EXPLOSIVE ORDNANCE DISPOSAL EQPMT [EOD EQPMT] 522 25,459 522 25,459 522 25,459 ........ ............... ........ ............... 136 REMOTE DEMOLITION SYSTEMS 364 8,044 364 8,044 364 8,044 ........ ............... ........ ............... 137 ITEMS LESS THAN $5M, COUNTERMINE EQUIPMENT ....... 3,698 ....... 3,698 ....... 3,698 ........ ............... ........ ............... COMBAT SERVICE SUPPORT EQUIPMENT 138 HEATERS AND ECU'S 1,332 12,210 1,332 12,210 ....... ............... -1,332 -12,210 -1,332 -12,210 139 SOLDIER ENHANCEMENT ....... 6,522 ....... 6,522 ....... 6,522 ........ ............... ........ ............... 140 PERSONNEL RECOVERY SUPPORT SYSTEM [PRSS] ....... 11,222 ....... 11,222 ....... 11,222 ........ ............... ........ ............... 141 GROUND SOLDIER SYSTEM 5,226 103,317 5,226 103,317 4,181 83,317 -1,045 -20,000 -1,045 -20,000 143 FIELD FEEDING EQUIPMENT 8,891 27,417 8,891 27,417 8,891 27,417 ........ ............... ........ ............... 145 CARGO AERIAL DEL & PERSONNEL PARACHUTE SYSTEM ....... 52,065 ....... 52,065 ....... 52,065 ........ ............... ........ ............... 146 MORTUARY AFFAIRS SYSTEMS ....... 2,358 ....... 2,358 ....... 2,358 ........ ............... ........ ............... 147 FAMILY OF ENGR COMBAT AND CONSTRUCTION SETS 266 31,573 266 31,573 266 31,573 ........ ............... ........ ............... 148 ITEMS LESS THAN $5M (ENG SPT) 818 14,093 818 14,093 818 14,093 ........ ............... ........ ............... PETROLEUM EQUIPMENT 149 DISTRIBUTION SYSTEMS, PETROLEUM & WATER 208 36,266 208 36,266 208 36,266 ........ ............... ........ ............... MEDICAL EQUIPMENT 150 COMBAT SUPPORT MEDICAL 1,938 34,101 1,938 34,101 1,938 34,101 ........ ............... ........ ............... 151 MEDEVAC MISSION EQUIPMENT PACKAGE [MEP] ....... 20,540 ....... 20,540 ....... 20,540 ........ ............... ........ ............... MAINTENANCE EQUIPMENT 152 MOBILE MAINTENANCE EQUIPMENT SYSTEMS 20 2,495 20 2,495 20 2,495 ........ ............... ........ ............... CONSTRUCTION EQUIPMENT 154 GRADER, ROAD MTZD, HVY, 6X4 (CCE) ....... 2,028 ....... 2,028 ....... 2,028 ........ ............... ........ ............... 156 SCRAPERS, EARTHMOVING 9 6,146 9 6,146 9 6,146 ........ ............... ........ ............... 157 MISSION MODULES--ENGINEERING 40 31,200 40 31,200 40 31,200 ........ ............... ........ ............... 161 TRACTOR, FULL TRACKED 61 20,867 61 20,867 61 20,867 ........ ............... ........ ............... 162 ALL TERRAIN CRANES 1 4,003 1 4,003 1 2,503 ........ -1,500 ........ -1,500 163 PLANT, ASPHALT MIXING 1 3,679 1 3,679 1 3,679 ........ ............... ........ ............... 164 HIGH MOBILITY ENGINEER EXCAVATOR [HMEE] FOS 76 30,042 76 30,042 76 30,042 ........ ............... ........ ............... 165 ENHANCED RAPID AIRFIELD CONSTRUCTION 182 13,725 182 13,725 ....... ............... -182 -13,725 -182 -13,725 166 CONST EQUIP ESP 47 13,351 47 13,351 47 11,351 ........ -2,000 ........ -2,000 167 ITEMS LESS THAN $5.0M (CONST EQUIP) ....... 9,134 ....... 9,134 ....... 9,134 ........ ............... ........ ............... RAIL FLOAT CONTAINERIZATION EQUIPMENT 170 ITEMS LESS THAN $5.0M (FLOAT/RAIL) ....... 10,552 ....... 10,552 ....... 10,552 ........ ............... ........ ............... GENERATORS 171 GENERATORS AND ASSOCIATED EQUIPMENT 2,074 60,302 2,074 60,302 ....... ............... -2,074 -60,302 -2,074 -60,302 MATERIAL HANDLING EQUIPMENT 173 FAMILY OF FORKLIFTS 64 5,895 64 5,895 64 5,895 ........ ............... ........ ............... TRAINING EQUIPMENT 175 COMBAT TRAINING CENTERS SUPPORT 339 104,649 339 104,649 339 104,649 ........ ............... ........ ............... 176 TRAINING DEVICES, NONSYSTEM ....... 125,251 ....... 125,251 ....... 119,251 ........ -6,000 ........ -6,000 177 CLOSE COMBAT TACTICAL TRAINER 8 19,984 8 19,984 8 19,984 ........ ............... ........ ............... 178 AVIATION COMBINED ARMS TACTICAL TRAINER [AVCA] ....... 10,977 ....... 10,977 ....... 10,977 ........ ............... ........ ............... 179 GAMING TECHNOLOGY IN SUPPORT OF ARMY TRAIN- ING ....... 4,056 ....... 4,056 ....... 4,056 ........ ............... ........ ............... TEST MEASURE AND DIG EQUIPMENT [TMD] 180 CALIBRATION SETS EQUIPMENT 3 10,494 3 10,494 3 10,494 ........ ............... ........ ............... 181 INTEGRATED FAMILY OF TEST EQUIPMENT [IFTE] 1,674 45,508 1,674 45,508 1,674 45,508 ........ ............... ........ ............... 182 TEST EQUIPMENT MODERNIZATION [TEMOD] 2,786 24,334 2,786 24,334 2,786 39,334 ........ +15,000 ........ +15,000 OTHER SUPPORT EQUIPMENT 183 RAPID EQUIPPING SOLDIER SUPPORT EQUIPMENT ....... 5,078 ....... 5,078 ....... ............... ........ -5,078 ........ -5,078 184 PHYSICAL SECURITY SYSTEMS (OPA3) ....... 46,301 ....... 46,301 ....... 46,301 ........ ............... ........ ............... 185 BASE LEVEL COM'L EQUIPMENT ....... 1,373 ....... 1,373 ....... 1,373 ........ ............... ........ ............... 186 MODIFICATION OF IN-SVC EQUIPMENT (OPA-3) 248 59,141 248 59,141 248 59,141 ........ ............... ........ ............... 187 PRODUCTION BASE SUPPORT (OTH) ....... 2,446 ....... 2,446 ....... 2,446 ........ ............... ........ ............... 188 SPECIAL EQUIPMENT FOR USER TESTING 206 12,920 206 12,920 206 12,920 ........ ............... ........ ............... 189 AMC CRITICAL ITEMS OPA3 1,141 19,180 1,141 19,180 1,141 19,180 ........ ............... ........ ............... 190 TRACTOR YARD ....... 7,368 ....... 7,368 ....... 2,368 ........ -5,000 ........ -5,000 191 BCT UNMANNED GROUND VEHICLE 311 83,937 311 83,937 76 31,937 -235 -52,000 -235 -52,000 ------------------------------------------------------------------------------------------------------------------------------------- TOTAL, OTHER SUPPORT EQUIPMENT ....... 1,300,392 ....... 1,300,392 ....... 1,059,923 ........ -240,469 ........ -240,469 SPARE AND REPAIR PARTS 193 INITIAL SPARES--C&E 34 64,507 34 64,507 34 64,507 ........ ............... ........ ............... ------------------------------------------------------------------------------------------------------------------------------------- TOTAL, SPARE AND REPAIR PARTS ....... 64,507 ....... 64,507 ....... 64,507 ........ ............... ........ CLASSIFIED PROGRAMS ....... 3,435 ....... 3,435 ....... 3,435 ........ ............... ........ ............... EMERGENCY MANAGEMENT MODERNIZATION PRO- GRAM ....... ............... ....... 52,000 ....... 52,000 ........ +52,000 ........ ............... NON-DEVELOPMENTAL EMERGING TECHNOLOGIES ....... ............... ....... ............... ....... 25,000 ........ +25,000 ........ +25,000 ARMY NATIONAL GUARD HMMWV MODERNIZATION PROGRAM ....... ............... ....... 100,000 ....... ............... ........ ............... ........ -100,000 ------------------------------------------------------------------------------------------------------------------------------------- TOTAL, OTHER PROCUREMENT, ARMY ....... 6,326,245 ....... 6,488,045 ....... 4,980,209 ........ -1,346,036 ........ -1,507,836 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ COMMITTEE RECOMMENDED ADJUSTMENTS The following table details the adjustments recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ 2013 budget Committee Change from Line Item estimate recommendation budget estimate ------------------------------------------------------------------------ 2Family of Medium 346,115 339,515 -6,600 Tactical Vehicle [FMTV] Medium .............. .............. -6,600 Tactical Vehicle Family support cost growth 19Nontactical 16,791 11,791 -5,000 Vehicles, Other Unobligated .............. .............. -5,000 balances 20Joint Combat 10,061 8,961 -1,100 Identification Marking System Unobligated .............. .............. -1,100 balances 21Win-T--Ground 892,635 511,720 -380,915 Forces Tactical Network Increment 1 .............. .............. -34,100 support cost growth Increment 2 .............. .............. -346,815 contract award delay 25Transportable 6,822 .............. -6,822 Tactical Command Communications Early to need .............. .............. -6,822 28Navstar Global 27,353 8,453 -18,900 Positioning System (SPACE) Contract .............. .............. -18,900 Award Delay 29Smart-T (SPACE) 98,656 14,040 -84,616 Army reduced .............. .............. -84,616 requirement 36Joint Tactical 556,250 366,250 -190,000 Radio System Contract .............. .............. -190,000 award delay-- Manpack 41TRACTOR DESK 7,779 2,579 -5,200 Excess to .............. .............. -5,200 need 44Soldier 1,833 .............. -1,833 Enhancement Program Comm/ Electronics Unobligated .............. .............. -1,833 balances 47Gunshot Detection 2,332 .............. -2,332 System [GDS] Contract .............. .............. -2,332 award delay 59Information 142,133 131,133 -11,000 Systems Unobligated .............. .............. -11,000 balances 69DCGS-A [MIP] 184,007 .............. -184,007 Transfer to .............. .............. -184,007 Title IX-- DCGS-A 82Sense Through the 6,212 .............. -6,212 Wall [STTW] Contract .............. .............. -6,212 award delay 83Night Vision 166,516 139,516 -27,000 Devices Transfer to .............. .............. -27,000 Title IX-- Night Vision Devices 90Indirect Fire 29,881 24,881 -5,000 Protection Family of Systems Excess to .............. .............. -5,000 need--traini ng 96Mod of In-Svc 22,403 88,403 +66,000 Equip [LLDR] Light Weight .............. .............. +66,000 Laser Designator/ Range Finder--Army identified shortfall 98Mortar Fire 29,505 21,705 -7,800 Control System Program cost .............. .............. -7,800 growth 99Counterfire 244,409 .............. -244,409 Radars Transfer to .............. .............. -244,409 Title IX-- Counterfire Radars 111Network 59,821 .............. -59,821 Management Initialization and Service Unjustified .............. .............. -11,900 unit cost growth Program .............. .............. -3,000 support cost growth Transfer to .............. .............. -44,921 Title IX-- Network Management Initializati on and Service 116Automated Data 129,438 129,438 ............... Processing Equip Army .............. .............. [57,700] requested internal realignment- -High Performance Computing Modernizatio n Program 126Family of Non- 3,960 .............. -3,960 Lethal Equipment [FNLE] Stun Device .............. .............. -3,960 requirement met with fiscal year 2012 funding 130Tactical Bridging 35,499 2,961 -32,538 Dry Support .............. .............. -32,000 Bridge contract award delay Line of .............. .............. -538 Communicatio n Bridge termination 131Tactical Bridge, 32,893 20,843 -12,050 Float-Ribbon Propulsion .............. .............. -12,050 contract award delay 134Robotic Combat 29,106 .............. -29,106 Support System [RCSS] Transfer to .............. .............. -29,106 Title IX-- Robotic Combat Support System [RCSS] 138Heaters and ECU'S 12,210 .............. -12,210 Transfer to .............. .............. -12,210 Title IX-- Heaters and ECU'S 141Ground Soldier 103,317 83,317 -20,000 System Reduce .............. .............. -20,000 funding by two Brigade Combat Teams 162All Terrain 4,003 2,503 -1,500 Cranes Excessive .............. .............. -1,500 support costs 165Enhanced Rapid 13,725 .............. -13,725 Airfield Construction Capa Excess to .............. .............. -13,725 need 166Const Equip Esp 13,351 11,351 -2,000 Excessive .............. .............. -2,000 support costs 171Generators and 60,302 .............. -60,302 Associated Equip Transfer to .............. .............. -60,302 Title IX-- Generators and Associated Equipment 176Training Devices, 125,251 119,251 -6,000 Nonsystem Unobligated .............. .............. -6,000 balances 182Test Equipment 24,334 39,334 +15,000 Modernization [TEMOD] Test and .............. .............. +15,000 Training Range upgrades 183Rapid Equipping 5,078 .............. -5,078 Soldier Support Equipment Transfer to .............. .............. -5,078 Title IX-- Rapid Equipping Soldier Support Equipment 190Tractor Yard 7,368 2,368 -5,000 Excess to .............. .............. -5,000 requirement 191Unmanned Ground 83,937 31,937 -52,000 Vehicle Early to need .............. .............. -52,000 Emergency .............. 52,000 +52,000 Management Modernization Program Army .............. .............. +52,000 requested transfer from Operation and Maintenance, Army, line 131--Emergen cy Management Modernizatio n Program Non-Developmental .............. 25,000 +25,000 Emerging Technologies Army .............. .............. +25,000 requested transfer from RDT&E, Army line 169--network integration exercise technology transition ------------------------------------------------------------------------ Budgeting for Sustainable Production Rates.--The Committee commends the Army on the continual improvements it has made over the past year in its integrated testing of the network solution. Over time, the Network Integration Evaluation [NIE] will help ensure the Army procures equipment only when it is ready and can operate within the network, creating savings in time, effort, and hardware costs. To leverage this success, the Committee encourages the Army to modify the way it budgets for equipment procured after positive performance at the NIE. Currently, the Army budgets for network items based on ``capability sets'', or the number of Brigade Combat Teams [BCTs] that will be outfitted with the equipment in a given fiscal year. This simplified approach is problematic because some equipment within the capability set can be manufactured in significantly higher quantities than other equipment in that same capability set. Forcing all vendors to produce to a certain number of BCTs does not result in the most economical unit cost. Additionally, meeting Army quantity demands may require some vendors to increase capacity in 1 fiscal year and then significantly reduce that capacity the next fiscal year. The Committee recommends the Army examine the individual vendor production capacity for each network item and plan to procure the most economical order quantity and to sustain that quantity over a period of time. To better enable congressional oversight of budgeting practices, budget justification material submitted for fiscal year 2014 should contain the most accurate projections of contractor production capacity, lead times, and delivery schedules. Tactical Wheeled Vehicle Strategy.--The Committee is concerned with the impact that recent reductions in Army requirements for tactical wheeled vehicles [TWV] will have on mission readiness and the TWV industrial base. The Committee notes that independently operating brigade combat teams have proven effective in the field and that these modular forces have increased overall Army requirements for TWV. The Committee directs the Army to submit an updated Tactical Wheeled Vehicle Strategy to the congressional defense committees not later than June 1, 2013. This report should include: (1) Plans for TWV procurement, integration, sustainment, and management; (2) Fleet size and mix requirements; (3) Allocation plans for reset work between organic and private sector components of the TWV industrial base; (4) Analysis of the potential impact on the TWV industrial base; and (5) Plans for sustaining the TWV industrial base. Warfighter Integration Network--Tactical [WIN-T].--In fiscal year 2012, the Army was appropriated $865,186,000 to procure WIN-T increment II units. Due to the Army's decision to delay operational testing until May 2012, the contract will not be awarded until September 2012. In the fiscal year 2013 budget, the Army requests $892,635,000 for additional units. The Committee is concerned that the Army is too focused on equipping capability sets and does not take the vendor's production capacity into account when budgeting for this program. The funding the Army requested would force the WIN-T vendor to hire additional workforce and invest in additional production capacity that would not be fiscally sustainable in the next budget request. Therefore, the Committee recommends a reduction of $346,815,000 to allow the vendor adequate time to enhance its production capacity and, subsequently, maintain a steady and fiscally sustainable production rate. Joint Tactical Radio System [JTRS]--Manpack.--The fiscal year 2013 Army budget request contains $287,314,000 for 4,589 JTRS Manpack units. The Committee notes that the Army has $30,348,000 in unobligated fiscal year 2012 funds for 410 Low Rate Initial Production [LRIP] units waiting to be put on contract. The JTRS Manpack underwent multiservice test and evaluation in May 2012 to inform a second LRIP decision later in the fiscal year after the test report is issued. The current acquisition strategy for this program calls for a second LRIP contract award prior to Full Rate Production [FRP]. However, the Army's budget request will put them into FRP before the program completes testing. Therefore, the Committee recommends a reduction of $190,000,000 to provide adequate funds for the second LRIP contract award. Joint Tactical Radio System [JTRS] Competition.--In an effort to ensure the most advanced and most capable technology is being deployed to the field, the Committee encourages the Department of the Army to leverage commercially available technology and competitively award procurement funds to ensure that Joint Tactical Radio System [JTRS] certified advanced technology can be integrated into the program. Aircraft Procurement, Navy Appropriations, 2012.................................... $17,675,734,000 Budget estimate, 2013................................... 17,129,296,000 House allowance......................................... 17,518,324,000 Committee recommendation................................ 16,936,358,000 The Committee recommends an appropriation of $16,936,358,000. This is $192,938,000 below the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [Dollars in thousands] ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Change from Change from Line Item Qty. 2013 budget Qty. House allowance Qty. Committee --------------------------------------------------- estimate recommendation Qty. Budget estimate Qty. House allowance ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ AIRCRAFT PROCUREMENT, NAVY COMBAT AIRCRAFT 1 EA-18G 12 $1,027,443 12 $940,965 12 $1,014,443 ....... -$13,000 ....... +$73,478 2 EA-18G (AP-CY) ....... ............... ....... 45,000 ....... 60,000 ....... +60,000 ....... +15,000 3 F/A-18E/F (FIGHTER) HORNET (MYP) 26 2,035,131 37 2,597,565 26 1,976,131 ....... -59,000 -11 -621,434 4 F/A-18E/F (FIGHTER) HORNET (MYP) (AP-CY) ....... 30,296 ....... 30,296 ....... 30,296 ....... ............... ....... ............... 5 JOINT STRIKE FIGHTER 4 1,007,632 4 965,979 4 988,832 ....... -18,800 ....... +22,853 6 JOINT STRIKE FIGHTER ADVANCE PROCUREMENT (CY) ....... 65,180 ....... 32,590 ....... 65,180 ....... ............... ....... +32,590 7 JSF STOVL 6 1,404,737 6 1,241,636 6 1,345,937 ....... -58,800 ....... +104,301 8 JSF STOVL (AP-CY) ....... 106,199 ....... 106,199 ....... 106,199 ....... ............... ....... ............... 9 V-22 (MEDIUM LIFT) 17 1,303,120 18 1,362,380 17 1,362,120 ....... +59,000 -1 -260 10 V-22 (MEDIUM LIFT) (AP-CY) ....... 154,202 ....... 154,202 ....... 154,202 ....... ............... ....... ............... 11 UH-1Y/AH-1Z 27 720,933 29 759,945 27 720,933 ....... ............... -2 -39,012 12 UH-1Y/AH-1Z (AP-CY) ....... 69,658 ....... 69,658 ....... 69,658 ....... ............... ....... ............... 13 MH-60S (MYP) 18 384,792 18 377,168 18 384,792 ....... ............... ....... +7,624 14 MH-60S (MYP) (AP-CY) ....... 69,277 ....... 69,277 ....... 69,277 ....... ............... ....... ............... 15 MH-60R 19 656,866 24 826,866 19 656,866 ....... ............... -5 -170,000 16 MH-60R (AP-CY) ....... 185,896 ....... 159,541 ....... 185,896 ....... ............... ....... +26,355 17 P-8A POSEIDON 13 2,420,755 13 2,387,052 13 2,385,209 ....... -35,546 ....... -1,843 18 P-8A POSEIDON (ADVANCE PROCUREMENT) ....... 325,679 ....... 325,679 ....... 325,679 ....... ............... ....... ............... 19 E-2D ADV HAWKEYE 5 861,498 5 833,498 5 861,498 ....... ............... ....... +28,000 20 E-2D ADV HAWKEYE (AP-CY) ....... 123,179 ....... 104,179 ....... 123,179 ....... ............... ....... +19,000 21 C-40A ....... ............... ....... ............... 2 158,000 +2 +158,000 +2 +158,000 ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, COMBAT AIRCRAFT ....... 12,952,473 ....... 13,389,675 ....... 13,044,327 ....... +91,854 ....... -345,348 TRAINER AIRCRAFT 22 JPATS 33 278,884 33 249,379 31 247,484 -2 -31,400 -2 -1,895 ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, TRAINER AIRCRAFT ....... 278,884 ....... 249,379 ....... 247,484 ....... -31,400 ....... -1,895 OTHER AIRCRAFT 23 KC-130J ....... 3,000 2 143,000 ....... 3,000 ....... ............... -2 -140,000 24 KC-130J (AP-CY) ....... 22,995 ....... 22,995 ....... 22,995 ....... ............... ....... ............... 25 RQ-4 UAV (AP-CY) ....... 51,124 ....... 51,124 ....... 51,124 ....... ............... ....... ............... 26 MQ-8 UAV 6 124,573 6 124,573 6 124,573 ....... ............... ....... ............... 27 STUASL0 UAV 5 9,593 5 9,593 ....... ............... -5 -9,593 -5 -9,593 ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, OTHER AIRCRAFT ....... 208,285 ....... 208,285 ....... 198,692 ....... -9,593 ....... -9,593 MODIFICATION OF AIRCRAFT 28 EA-6 SERIES ....... 30,062 ....... 30,062 ....... 30,062 ....... ............... ....... ............... 29 AEA SYSTEMS ....... 49,999 ....... 45,019 ....... 49,799 ....... -200 ....... +4,780 30 AV-8 SERIES ....... 38,703 ....... 38,703 ....... 38,703 ....... ............... ....... ............... 31 ADVERSARY ....... 4,289 ....... 4,289 ....... 4,289 ....... ............... ....... ............... 32 F-18 SERIES ....... 647,306 ....... 610,194 ....... 625,906 ....... -21,400 ....... +15,712 33 H-46 SERIES ....... 2,343 ....... 2,343 ....... 2,343 ....... ............... ....... ............... 34 AH-1W SERIES ....... 8,721 ....... 8,721 ....... 8,721 ....... ............... ....... ............... 35 H-53 SERIES ....... 45,567 ....... 42,367 ....... 38,067 ....... -7,500 ....... -4,300 36 SH-60 SERIES ....... 83,527 ....... 98,392 ....... 82,527 ....... -1,000 ....... -15,865 37 H-1 SERIES ....... 6,508 ....... 6,508 ....... 6,508 ....... ............... ....... ............... 38 EP-3 SERIES ....... 66,374 ....... 66,374 ....... 63,474 ....... -2,900 ....... -2,900 39 P-3 SERIES ....... 148,405 ....... 138,905 ....... 146,645 ....... -1,760 ....... +7,740 40 E-2 SERIES ....... 16,322 ....... 16,322 ....... 16,322 ....... ............... ....... ............... 41 TRAINER A/C SERIES ....... 34,284 ....... 28,134 ....... 34,284 ....... ............... ....... +6,150 42 C-2A ....... 4,743 ....... 4,743 ....... 4,743 ....... ............... ....... ............... 43 C-130 SERIES ....... 60,302 ....... 46,067 ....... 60,196 ....... -106 ....... +14,129 44 FEWSG ....... 670 ....... 670 ....... 670 ....... ............... ....... ............... 45 CARGO/TRANSPORT A/C SERIES ....... 26,311 ....... 15,629 ....... 10,011 ....... -16,300 ....... -5,618 46 E-6 SERIES ....... 158,332 ....... 153,342 ....... 152,732 ....... -5,600 ....... -610 47 EXECUTIVE HELICOPTERS SERIES ....... 58,163 ....... 58,163 ....... 43,163 ....... -15,000 ....... -15,000 48 SPECIAL PROJECT AIRCRAFT ....... 12,421 ....... 11,421 ....... ............... ....... -12,421 ....... -11,421 49 T-45 SERIES ....... 64,488 ....... 48,908 ....... 59,488 ....... -5,000 ....... +10,580 50 POWER PLANT CHANGES ....... 21,569 ....... 21,569 ....... 13,569 ....... -8,000 ....... -8,000 51 JPATS SERIES ....... 1,552 ....... 1,552 ....... 1,552 ....... ............... ....... ............... 52 AVIATION LIFE SUPPORT MODS ....... 2,473 ....... 2,473 ....... 2,473 ....... ............... ....... ............... 53 COMMON ECM EQUIPMENT ....... 114,690 ....... 112,944 ....... 81,835 ....... -32,855 ....... -31,109 54 COMMON AVIONICS CHANGES ....... 96,183 ....... 94,783 ....... 75,133 ....... -21,050 ....... -19,650 56 ID SYSTEMS ....... 39,846 ....... 36,112 ....... 39,846 ....... ............... ....... +3,734 57 P-8 SERIES ....... 5,302 ....... 5,302 ....... 5,302 ....... ............... ....... ............... 58 MAGTF EW FOR AVIATION ....... 34,127 ....... 34,127 ....... 34,127 ....... ............... ....... ............... 59 RQ-7 SERIES ....... 49,324 ....... 49,324 ....... ............... ....... -49,324 ....... -49,324 60 V-22 (TILT/ROTOR ACFT) OSPREY ....... 95,856 ....... 91,856 ....... 95,856 ....... ............... ....... +4,000 ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, MODIFICATION OF AIRCRAFT ....... 2,028,762 ....... 1,925,318 ....... 1,828,346 ....... -200,416 ....... -96,972 AIRCRAFT SPARES AND REPAIR PARTS 61 SPARES AND REPAIR PARTS ....... 1,166,430 ....... 1,119,200 ....... 1,166,430 ....... ............... ....... +47,230 AIRCRAFT SUPPORT EQUIPMENT AND FACILITIES 62 COMMON GROUND EQUIPMENT ....... 387,195 ....... 381,195 ....... 387,195 ....... ............... ....... +6,000 63 AIRCRAFT INDUSTRIAL FACILITIES ....... 23,469 ....... 21,474 ....... 23,469 ....... ............... ....... +1,995 64 WAR CONSUMABLES ....... 43,383 ....... 43,383 ....... ............... ....... -43,383 ....... -43,383 65 OTHER PRODUCTION CHARGES ....... 3,399 ....... 3,399 ....... 3,399 ....... ............... ....... ............... 66 SPECIAL SUPPORT EQUIPMENT ....... 32,274 ....... 32,274 ....... 32,274 ....... ............... ....... ............... 67 FIRST DESTINATION TRANSPORTATION ....... 1,742 ....... 1,742 ....... 1,742 ....... ............... ....... ............... ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, AIRCRAFT SUPPORT EQUIPMENT & FACILITIES ....... 491,462 ....... 483,467 ....... 448,079 ....... -43,383 ....... -35,388 ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, AIRCRAFT PROCUREMENT, NAVY ....... 17,129,296 ....... 17,518,324 ....... 16,936,358 ....... -192,938 ....... -581,966 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ COMMITTEE RECOMMENDED ADJUSTMENTS The following table details the adjustments recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ 1EA-18G 1,027,443 1,014,443 -13,000 Engine cost .............. .............. -13,000 growth 2EA-18G Advance .............. 60,000 +60,000 Procurement Advance .............. .............. +60,000 procurement for 15 EA- 18Gs 3F/A-18E/F 2,035,131 1,976,131 -59,000 (Fighter) Hornet Engine cost .............. .............. -28,000 growth Engineering .............. .............. -6,000 Change Order excess funding Non-Recurring .............. .............. -25,000 cost growth 5Joint Strike 1,007,632 988,832 -18,800 Fighter CV Excessive .............. .............. -18,800 weapon system unit cost increase 7JSF STOVL 1,404,737 1,345,937 -58,800 Excessive .............. .............. -58,800 weapon system unit cost increase 9V-22 (Medium Lift) 1,303,120 1,362,120 +59,000 Flyaway unit .............. .............. -12,000 cost savings Replace .............. .............. +71,000 operational loss 17P-8A Poseidon 2,420,755 2,385,209 -35,546 Excess to need .............. .............. -35,546 21C-40A .............. 158,000 +158,000 2 C-40 .............. .............. +158,000 aircraft to fund Navy Reserve shortfall 22JPATS 278,884 247,484 -31,400 Reduce 2 .............. .............. -15,300 aircraft Airframe cost .............. .............. -10,100 growth Engineering .............. .............. -6,000 Change Order excess funding 27STUASL0 UAV 9,593 .............. -9,593 Program .............. .............. -9,593 Decrease 29AEA Systems 49,999 49,799 -200 Airborne .............. .............. -200 Electronic Attack Expendable early to need 32F-18 Series 647,306 625,906 -21,400 Correction of .............. .............. -7,000 Operational Discrepancies integrated logistics support cost growth Core Avionics .............. .............. -10,000 Improvements installation equipment non- recurring engineering unjustified cost Other Support .............. .............. -4,400 cost growth 35H-53 Series 45,567 38,067 -7,500 Other Support .............. .............. -7,500 cost growth 36SH-60 Series 83,527 82,527 -1,000 Other Support .............. .............. -1,000 cost growth 38EP-3 Series 66,374 63,474 -2,900 Quick Reaction .............. .............. -1,000 Capability unjustified request Other Support .............. .............. -1,900 cost growth 39P-3 Series 148,405 146,645 -1,760 Special .............. .............. -1,760 Structural Inspection Kits installation cost growth 43C-130 Series 60,302 60,196 -106 C-130J .............. .............. -106 Communication Navigation Surveillance/ Air Traffic Management Integrated Logistics Support excess to need 45Cargo/Transport A/ 26,311 10,011 -16,300 C Series Unobligated .............. .............. -6,300 balances Transfer to .............. .............. -10,000 Title IX-- Cargo/ Transport Aircraft Series 46E-6 Series 158,332 152,732 -5,600 Tech Insertion .............. .............. -2,600 Other Support cost growth Service Life .............. .............. -3,000 Extension Program installation cost growth 47Executive 58,163 43,163 -15,000 Helicopters Series VH-3D Cockpit .............. .............. -15,000 Upgrade Non- Recurring Engineering contract delay 48Special Project 12,421 .............. -12,421 Aircraft Transfer to .............. .............. -12,421 Title IX-- Special Project Aircraft 49T-45 Series 64,488 59,488 -5,000 Avionics .............. .............. -2,000 Obsolescence kit cost growth Synthetic .............. .............. -3,000 Radar kit cost growth 50Power Plant 21,569 13,569 -8,000 Changes Unobligated .............. .............. -8,000 balances 53Common ECM 114,690 81,835 -32,855 Equipment Transfer to .............. .............. -32,855 Title IX-- Directed Infrared Countermeasur es 54Common Avionics 96,183 75,133 -21,050 Changes Prior year .............. .............. -2,200 funding withhold available Transfer to .............. .............. -18,850 Title IX-- Blue Force Situational Awareness 59RQ-7 Series 49,324 .............. -49,324 Transfer to .............. .............. -49,324 Title IX-- Retrofits 64War Consumables 43,383 .............. -43,383 Transfer to .............. .............. -43,383 Title IX--War Consumables ------------------------------------------------------------------------ Weapons Procurement, Navy Appropriations, 2012.................................... $3,224,432,000 Budget estimate, 2013................................... 3,117,578,000 House allowance......................................... 3,072,112,000 Committee recommendation................................ 3,066,919,000 The Committee recommends an appropriation of $3,066,919,000. This is $50,659,000 below the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [Dollars in thousands] ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Change from Change from Line Item Qty. 2013 budget Qty. House allowance Qty. Committee --------------------------------------------------- estimate recommendation Qty. Budget estimate Qty. House allowance ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ WEAPONS PROCUREMENT, NAVY BALLISTIC MISSILES MODIFICATION OF MISSILES 1 TRIDENT II MODS ....... $1,224,683 ....... $1,202,583 ....... $1,211,983 ....... -$12,700 ....... +$9,400 SUPPORT EQUIPMENT AND FACILITIES 2 MISSILE INDUSTRIAL FACILITIES ....... 5,553 ....... 5,553 ....... 5,553 ....... ............... ....... ............... ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, BALLISTIC MISSILES ....... 1,230,236 ....... 1,208,136 ....... 1,217,536 ....... -12,700 ....... +9,400 OTHER MISSILES STRATEGIC MISSILES 3 TOMAHAWK 196 308,970 196 293,970 196 298,970 ....... -10,000 ....... +5,000 TACTICAL MISSILES 4 AMRAAM 67 102,683 161 97,390 67 92,359 ....... -10,324 -94 -5,031 5 SIDEWINDER 150 80,226 132 74,267 150 74,267 ....... -5,959 +18 ............... 6 JSOW 280 127,609 266 127,609 280 127,609 ....... ............... +14 ............... 7 STANDARD MISSILE 94 399,482 89 371,582 89 381,762 -5 -17,720 ....... +10,180 8 RAM 62 66,769 61 65,769 62 66,769 ....... ............... +1 +1,000 9 HELLFIRE 998 74,501 281 74,501 998 74,501 ....... ............... +717 ............... 11 AERIAL TARGETS ....... 61,518 ....... 61,518 ....... 59,862 ....... -1,656 ....... -1,656 12 OTHER MISSILE SUPPORT ....... 3,585 ....... 3,585 ....... 3,585 ....... ............... ....... ............... MODIFICATION OF MISSILES 13 ESSM 37 58,194 37 53,694 37 58,194 ....... ............... ....... +4,500 14 HARM MODS 100 86,721 100 86,721 100 86,721 ....... ............... ....... ............... SUPPORT EQUIPMENT AND FACILITIES 16 WEAPONS INDUSTRIAL FACILITIES ....... 2,014 ....... 2,014 ....... 2,014 ....... ............... ....... ............... 17 FLEET SATELLITE COMM FOLLOW-ON ....... 21,454 ....... 21,454 ....... 21,454 ....... ............... ....... ............... ORDNANCE SUPPORT EQUIPMENT 18 ORDNANCE SUPPORT EQUIPMENT ....... 54,945 ....... 54,945 ....... 54,945 ....... ............... ....... ............... ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, OTHER MISSILES ....... 1,448,671 ....... 1,389,019 ....... 1,403,012 ....... -45,659 ....... +13,993 TORPEDOES AND RELATED EQUIPMENT TORPEDOES AND RELATED EQUIP 19 SSTD ....... 2,700 ....... 2,700 ....... 2,700 ....... ............... ....... ............... 20 ASW TARGETS ....... 10,385 ....... 10,385 ....... 10,385 ....... ............... ....... ............... MOD OF TORPEDOES AND RELATED EQUIP 21 MK-46 TORPEDO MODS 75 74,487 75 73,487 75 74,487 ....... ............... ....... +1,000 22 MK-48 TORPEDO ADCAP MODS 94 54,281 94 48,833 94 54,281 ....... ............... ....... +5,448 23 QUICKSTRIKE MINE ....... 6,852 ....... 6,852 ....... 6,852 ....... ............... ....... ............... SUPPORT EQUIPMENT 24 TORPEDO SUPPORT EQUIPMENT ....... 46,402 ....... 46,402 ....... 46,402 ....... ............... ....... ............... 25 ASW RANGE SUPPORT ....... 11,927 ....... 9,327 ....... 11,927 ....... ............... ....... +2,600 DESTINATION TRANSPORTATION 26 FIRST DESTINATION TRANSPORTATION ....... 3,614 ....... 3,614 ....... 3,614 ....... ............... ....... ............... ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, TORPEDOES AND RELATED EQUIPMENT ....... 210,648 ....... 201,600 ....... 210,648 ....... ............... ....... +9,048 OTHER WEAPONS GUNS AND GUN MOUNTS 27 SMALL ARMS AND WEAPONS ....... 12,594 ....... 12,594 ....... 12,594 ....... ............... ....... ............... MODIFICATION OF GUNS AND GUN MOUNTS 28 CIWS MODS ....... 59,303 ....... 57,303 ....... 67,003 ....... +7,700 ....... +9,700 29 COAST GUARD WEAPONS ....... 19,072 ....... 13,216 ....... 19,072 ....... ............... ....... +5,856 30 GUN MOUNT MODS ....... 54,706 ....... 54,706 ....... 54,706 ....... ............... ....... ............... 31 CRUISER MODERNIZATION WEAPONS ....... 1,591 ....... 54,781 ....... 1,591 ....... ............... ....... -53,190 32 AIRBORNE MINE NEUTRALIZATION SYSTEMS ....... 20,607 ....... 20,607 ....... 20,607 ....... ............... ....... ............... ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, OTHER WEAPONS ....... 167,873 ....... 213,207 ....... 175,573 ....... +7,700 ....... -37,634 34 SPARES AND REPAIR PARTS ....... 60,150 ....... 60,150 ....... 60,150 ....... ............... ....... ............... ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, WEAPONS PROCUREMENT, NAVY ....... 3,117,578 ....... 3,072,112 ....... 3,066,919 ....... -50,659 ....... -5,193 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ COMMITTEE RECOMMENDED ADJUSTMENTS The following table details the adjustments recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ 2013 budget Committee Change from Line Item estimate recommendation budget request ------------------------------------------------------------------------ 1 Trident II Mods 1,224,683 1,211,983 -12,700 Reduce .............. .............. -12,700 Unjustified Program Support Costs 3 Tomahawk 308,970 298,970 -10,000 Contract .............. .............. -10,000 Savings 4 AMRAAM 102,683 92,359 -10,324 Captive Air .............. .............. -10,324 Training Missile Cost Growth 5 Sidewinder 80,226 74,267 -5,959 All Up Round .............. .............. -3,847 Missile Cost Growth Captive Air .............. .............. -2,112 Training Missile Cost Growth 7 Standard Missile 399,482 381,762 -17,720 SM-6 .............. .............. -17,720 Maintain FY12 Production Levels 11 Aerial Targets 61,518 59,862 -1,656 Rocket Motor .............. .............. -1,656 Unit Cost Growth 28 CIWS Mods 59,303 67,003 +7,700 Authorizatio .............. .............. +7,700 n Increase to Buy Additional RMA Kits ------------------------------------------------------------------------ Standard Missile 6 [SM-6].--The Committee recommends $381,762,000 for procurement of the SM-6 missile in Weapons Procurement, Navy, a decrease of $17,720,000 below the budget request. The fiscal year 2013 budget requests an increase in production rates even though the program is experiencing unit cost increases, continues to have problems with operational testing, and delayed its full-rate production. As a result, the Committee is concerned with the concurrency in this program and provides funding for a total of 89 missiles, the same level of production as fiscal year 2012. In addition, the Committee recommends $43,891,000 in Research, Development, Test and Evaluation, Navy, a decrease of $20,000,000 below the request, due to program execution delays. Procurement of Ammunition, Navy and Marine Corps Appropriations, 2012.................................... $626,848,000 Budget estimate, 2013................................... 759,539,000 House allowance......................................... 677,243,000 Committee recommendation................................ 719,154,000 The Committee recommends an appropriation of $719,154,000. This is $40,385,000 below the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [Dollars in thousands] ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Change from Change from Line Item Qty. 2013 budget Qty. House allowance Qty. Committee --------------------------------------------------- estimate recommendation Qty. Budget estimate Qty. House allowance ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ PROCUREMENT OF AMMO, NAVY & MARINE CORPS PROC AMMO, NAVY NAVY AMMUNITION 1 GENERAL PURPOSE BOMBS ....... $27,024 ....... $26,024 ....... $27,024 ....... ............... ....... +$1,000 2 AIRBORNE ROCKETS, ALL TYPES ....... 56,575 ....... 54,775 ....... 56,575 ....... ............... ....... +1,800 3 MACHINE GUN AMMUNITION ....... 21,266 ....... 20,266 ....... 21,266 ....... ............... ....... +1,000 4 PRACTICE BOMBS ....... 34,319 ....... 32,619 ....... 34,319 ....... ............... ....... +1,700 5 CARTRIDGES & CART ACTUATED DEVICES ....... 53,755 ....... 53,755 ....... 53,755 ....... ............... ....... ............... 6 AIR EXPENDABLE COUNTERMEASURES ....... 61,693 ....... 58,233 ....... 60,693 ....... -$1,000 ....... +2,460 7 JATOS ....... 2,776 ....... 2,776 ....... 2,776 ....... ............... ....... ............... LRLAP 6" LONG RANGE ATTACK PROJECTILE ....... 7,102 ....... 7,102 ....... 7,102 ....... ............... ....... ............... 9 5 INCH/54 GUN AMMUNITION ....... 48,320 ....... 48,320 ....... 48,320 ....... ............... ....... ............... 10 INTERMEDIATE CALIBER GUN AMMUNITION ....... 25,544 ....... 25,544 ....... 18,544 ....... -7,000 ....... -7,000 11 OTHER SHIP GUN AMMUNITION ....... 41,624 ....... 36,184 ....... 38,884 ....... -2,740 ....... +2,700 12 SMALL ARMS & LANDING PARTY AMMO ....... 65,893 ....... 63,515 ....... 65,247 ....... -646 ....... +1,732 13 PYROTECHNIC AND DEMOLITION ....... 11,176 ....... 11,176 ....... 11,176 ....... ............... ....... ............... 14 AMMUNITION LESS THAN $5 MILLION ....... 4,116 ....... 4,116 ....... 4,116 ....... ............... ....... ............... ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, PROC AMMO, NAVY ....... 461,183 ....... 444,405 ....... 449,797 ....... -11,386 ....... +5,392 PROC AMMO, MARINE CORPS MARINE CORPS AMMUNITION 15 SMALL ARMS AMMUNITION ....... 83,733 ....... 75,759 ....... 77,429 ....... -6,304 ....... +1,670 16 LINEAR CHARGES, ALL TYPES ....... 24,645 ....... 18,253 ....... 24,645 ....... ............... ....... +6,392 17 40 MM, ALL TYPES ....... 16,201 ....... 16,201 ....... 16,201 ....... ............... ....... ............... 19 81MM, ALL TYPES ....... 13,711 ....... 3,711 ....... 13,711 ....... ............... ....... +10,000 20 120MM, ALL TYPES ....... 12,557 ....... 12,557 ....... 12,557 ....... ............... ....... ............... 22 GRENADES, ALL TYPES ....... 7,634 ....... 6,185 ....... 7,634 ....... ............... ....... +1,449 23 ROCKETS, ALL TYPES ....... 27,528 ....... 27,528 ....... 27,528 ....... ............... ....... ............... 24 ARTILLERY, ALL TYPES ....... 93,065 ....... 55,409 ....... 76,459 ....... -16,606 ....... +21,050 25 DEMOLITION MUNITIONS, ALL TYPES ....... 2,047 ....... ............... ....... ............... ....... -2,047 ....... ............... 26 FUZE, ALL TYPES ....... 5,297 ....... 5,297 ....... 1,255 ....... -4,042 ....... -4,042 27 NON LETHALS ....... 1,362 ....... 1,362 ....... 1,362 ....... ............... ....... ............... 28 AMMO MODERNIZATION ....... 4,566 ....... 4,566 ....... 4,566 ....... ............... ....... ............... 29 ITEMS LESS THAN $5 MILLION ....... 6,010 ....... 6,010 ....... 6,010 ....... ............... ....... ............... ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, PROC AMMO, MARINE CORPS ....... 298,356 ....... 232,838 ....... 269,357 ....... -28,999 ....... +36,519 ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, PROCUREMENT OF AMMO, NAVY & MARINE CORPS ....... 759,539 ....... 677,243 ....... 719,154 ....... -40,385 ....... +41,911 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ COMMITTEE RECOMMENDED ADJUSTMENTS The following table details the adjustments recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ 2013 budget Committee Change from Line Item estimate recommendation budget request ------------------------------------------------------------------------ 6Air Expendable 61,693 60,693 -1,000 Countermeasures ALE-55 cost .............. .............. -1,000 growth 10Intermediate 25,544 18,544 -7,000 Caliber Gun Ammunition MK295 .............. .............. -1,100 cartridge prior year funds available MK295 .............. .............. -5,900 cartridge decreased unit cost 11Other Ship Gun 41,624 38,884 -2,740 Ammunition 30MM x 173 .............. .............. -2,740 linked cartridge contract delay 12Small Arms & 65,893 65,247 -646 Landing Party Ammo M18A1 mine .............. .............. -646 cost growth 15Small Arms 83,733 77,429 -6,304 Ammunition Prior year .............. .............. -6,304 funds available 24Artillery, All 93,065 76,459 -16,606 Types Prior year .............. .............. -16,606 funds available 25Demolition 2,047 .............. -2,047 Munitions, All Types Excess to .............. .............. -2,047 requirement 26Fuze, All Types 5,297 1,255 -4,042 Prior year .............. .............. -4,042 funds available ------------------------------------------------------------------------ Shipbuilding and Conversion, Navy Appropriations, 2012.................................... $14,919,114,000 Budget estimate, 2013................................... 13,579,845,000 House allowance......................................... 15,236,126,000 Committee recommendation................................ 15,614,855,000 The Committee recommends an appropriation of $15,614,855,000. This is $2,035,010,000 above the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [Dollars in thousands] ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Change from Change from Line Item Qty. 2013 budget Qty. House allowance Qty. Committee ----------------------------------------------------- estimate recommendation Qty. Budget estimate Qty. House allowance ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ SHIPBUILDING & CONVERSION, NAVY OTHER WARSHIPS 1 CARRIER REPLACEMENT PROGRAM ....... $608,195 ....... $578,295 ....... $564,371 ....... -$43,824 ......... -$13,924 3 VIRGINIA CLASS SUBMARINE 2 3,217,601 2 3,217,601 2 3,217,601 ....... ............... ......... ............... 4 VIRGINIA CLASS SUBMARINE (AP-CY) ....... 874,878 ....... 1,597,878 ....... 1,652,557 ....... +777,679 ......... +54,679 5 CVN REFUELING OVERHAUL ....... 1,613,392 ....... 1,613,392 ....... 1,613,392 ....... ............... ......... ............... 6 CVN REFUELING OVERHAULS (AP-CY) ....... 70,010 ....... 70,010 ....... 70,010 ....... ............... ......... ............... 8 DDG 1000 ....... 669,222 ....... 669,222 ....... 669,222 ....... ............... ......... ............... 9 DDG-51 2 3,048,658 3 4,036,628 3 4,048,658 +1 +1,000,000 ......... +12,030 10 DDG-51 (AP-CY) ....... 466,283 ....... 466,283 ....... 466,283 ....... ............... ......... ............... 11 LITTORAL COMBAT SHIP 4 1,784,959 4 1,784,959 4 1,784,959 ....... ............... ......... ............... ------------------------------------------------------------------------------------------------------------------------------------- TOTAL, OTHER WARSHIPS ....... 12,353,198 ....... 14,034,268 ....... 14,087,053 ....... +1,733,855 ......... +52,785 13 LPD-17(AP) ....... ............... ....... ............... ....... 263,255 ....... +263,255 ......... +263,255 16 JOINT HIGH SPEED VESSEL 1 189,196 1 189,196 1 189,196 ....... ............... ......... ............... ------------------------------------------------------------------------------------------------------------------------------------- TOTAL, AMPHIBIOUS SHIPS ....... 189,196 ....... 189,196 ....... 452,451 ....... +263,255 ......... +263,255 17 MOORED TRAINING SHIP ....... 307,300 ....... 307,300 ....... 307,300 ....... ............... ......... ............... 18 OUTFITTING ....... 309,648 ....... 284,859 ....... 309,648 ....... ............... ......... +24,789 20 LCAC SLEP 2 47,930 2 47,930 4 85,830 +2 +37,900 +2 +37,900 21 COMPLETION OF PY SHIPBUILDING PROGRAMS ....... 372,573 ....... 372,573 ....... 372,573 ....... ............... ......... ............... ------------------------------------------------------------------------------------------------------------------------------------- TOTAL, AUXILIARIES, CRAFT, AND PRIOR-YEAR ....... 1,037,451 ....... 1,012,662 ....... 1,075,351 ....... +37,900 ......... +62,689 PROGRAM ------------------------------------------------------------------------------------------------------------------------------------- TOTAL, SHIPBUILDING & CONVERSION, NAVY ....... 13,579,845 ....... 15,236,126 ....... 15,614,855 ....... +2,035,210 ......... +378,729 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ COMMITTEE RECOMMENDED ADJUSTMENTS The following table details the adjustments recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ 2013 budget Committee Change from Line Item estimate recommendation budget estimate ------------------------------------------------------------------------ 1Carrier 608,195 564,371 -43,824 Replacement Program CVN-79--exc ............... ............... -28,000 essive cost growth AN/UPX- ............... ............... -10,824 29(V) IFF-- revised cost estimate ESS, SEWIP ............... ............... -5,000 Block 2-- pricing adjustment 4Virginia Class 874,878 1,652,557 +777,679 Submarine Advance ............... ............... +777,679 procuremen t for second SSN in fiscal year 2014-- authorizat ion adjustment 9DDG-51 3,149,381 4,149,381 +1,000,000 Additional ............... ............... +1,000,000 ship 13LPD-17 ............... 263,255 +263,255 LPD-17 ............... ............... +263,255 Advance Procuremen t 20LCAC SLEP 47,930 85,830 +37,900 LCAC SLEP-- ............... ............... +37,900 restore unjustifie d reduction of two ------------------------------------------------------------------------ Navy Shipbuilding Plans.--The fiscal year 2013 budget request includes $13,579,845,000 in Shipbuilding and Conversion, Navy [SCN], a decrease of $1,339,269,000 from amounts appropriated in fiscal year 2012. The Navy's projected fiscal year 2014 SCN budget request is a further decrease of no less than $1,000,000,000. The Committee is concerned with the apparent disconnect between the Navy's publicly stated priorities and the Navy's fiscal year 2013 shipbuilding budget submission which, as compared to the fiscal year 2012 plan, reduces planned ship procurement for the next 5 years by 16 ships and eliminates funding for one Virginia class attack submarine, one amphibious ship, and three oilers. In addition, the Navy's budget request omits funding for an additional Arleigh Burke class guided missile destroyer contrary to the Navy's force structure goals. The Committee is concerned that these proposed adjustments will drive up costs for multiple classes of ships and negatively impact the industrial base, almost certainly leading to additional cost growth in shipbuilding. The Committee notes that it was just 3 years ago that the Navy had implemented sufficient cost-reduction measures to allow for the procurement of two Virginia class attack submarines per year. The Committee is troubled that the Navy removed one Virginia class attack submarine from its near-term shipbuilding plan, particularly when the Navy is seeking multiyear procurement authority for Virginia class submarines to be procured from fiscal years 2014 through 2018. The Committee has been informed by the Navy that procuring 10 Virginia class submarines in the next multiyear procurement instead of 9 as proposed in the fiscal year 2013 budget request would result in an average submarine unit cost reduction in excess of $120,000,000. The Committee believes that these cost savings and the avoidance of industrial base perturbations warrant the inclusion of a tenth Virginia class submarine in the next multiyear procurement. The Committee has been advised by the Navy that the addition of a tenth submarine, which would be procured in fiscal year 2014, to the multiyear procurement necessitates Advance Procurement funding in fiscal year 2013. Therefore, the Committee recommends an additional $777,679,000 only for Advance Procurement of a second Virginia class submarine in fiscal year 2014, as authorized in S. 3254, the National Defense Authorization Act for Fiscal Year 2013, as reported. As noted in Senate Report 112-173 to accompany S. 3254, as reported, procurement of an additional submarine in fiscal year 2014 will help alleviate an attack submarine shortfall anticipated in 2022. In addition, the Committee understands that current budget constraints make full funding of all 10 submarines included in the multiyear procurement in accordance with the Department's Financial Management Regulations unaffordable, but that incrementally funding these submarines allows for their procurement within the current budget. While incremental funding authority is currently only provided for aircraft carriers and large-deck amphibious ships, the Committee notes the precedence for incrementally funding a submarine and recommends incremental funding authority only for the Virginia class submarines to be procured under the next multiyear procurement. In addition, the fiscal year 2013 budget request includes a proposal to procure nine Arleigh Burke class guided missile destroyers at a rate of two ships per year for the next 5 years with the exception of fiscal year 2014, where the Navy has only budgeted for one Arleigh Burke class guided missile destroyer. The Committee has been informed by the Navy that a tenth destroyer could be added to this multiyear procurement at a significantly lower ship unit cost. According to the Navy, those costs could be partially offset with savings generated from previous competitive procurements, with the balance of funding required in the fiscal year 2014 shipbuilding budget request. Recognizing the fiscal pressures on the Navy's fiscal year 2014 shipbuilding budget, the Committee recommends taking advantage of these significant cost savings now and recommends an additional $1,000,000,000 in fiscal year 2013 to fully fund a tenth Arleigh Burke class guided missile destroyer within the next multiyear procurement. The Committee notes that within this multiyear procurement, the Navy intends to include next generation Flight III Arleigh Burke class guided missile destroyers with an improved radar suite and combat systems capability as an Engineering Change Proposal [ECP]. Since the radar is still in development, acquisition authorities within the Department have yet to be established, and the ECP has no defined scope and associated cost estimates, the Committee finds it premature to request authority for this ECP within the multiyear procurement at this time. Therefore, the Committee provides multiyear procurement authority only for Flight IIA Arleigh Burke class guided missile destroyers, as authorized in S. 3254, the National Defense Authorization Act for Fiscal Year 2013, as reported. Finally, the fiscal year 2013 budget request includes a proposal to eliminate an amphibious class warship from the 5- year shipbuilding plan, and defers funding for the only other amphibious ship in the Navy's 5-year plan until fiscal year 2017. As detailed in section 130 of S. 3254, the National Defense Authorization Act for Fiscal Year 2013, as reported, the Navy and Marine Corps have agreed on a fiscally constrained minimum force of 33 ships to meet a 38 amphibious warship force requirement. Currently, there are 29 ships in the Department of the Navy's amphibious fleet and the most recent shipbuilding and retirement plan submitted to Congress reduces the force to 28 vessels in fiscal year 2015. If all amphibious warships currently in the inventory were operationally available, the Marine Expeditionary Brigade assault echelon would be lacking approximately 400,000 square feet of vehicle stowage and 3 million gallons of JP-5 jet fuel. However, since 10 to 15 percent of warships are in overhaul and unavailable at any given time, the number of operationally available amphibious warships leaves an even greater shortfall and is significantly below the minimum lift requirement stated by the Department of the Navy. The Committee is deeply concerned about the level of risk being assumed with amphibious lift capability and the impact this has on Commanders to meet operations plans and crisis response requirements, particularly as the Department of Defense rebalances its global posture towards the Asia-Pacific region. The Committee is also concerned about the ability to address this assumed risk when the next amphibious class warship in the Navy's shipbuilding plan does not appear until 5 years from now. As noted earlier, this proposal and funding gap will almost certainly have a negative industrial base impact and lead to additional cost growth in multiple shipbuilding programs. Therefore, to start addressing the amphibious lift shortfall that exists today, the Committee recommends an additional $263,255,000 only for Advance Procurement of continued LPD-17 Class amphibious ship production. Landing Craft Air Cushioned [LCAC] Service Life Extension Program [SLEP].--The fiscal year 2013 budget request includes $47,930,000 for two LCAC SLEPs, a reduction of two from the prior year, and two less than what is budgeted in each subsequent fiscal year through 2018. Therefore, the Committee finds the Navy's proposal of a 1-year reduction to the acquisition profile inefficient and recommends an additional $37,900,000 to restore two LCAC SLEPS in fiscal year 2013. Harbor Yard Tugs.--The fiscal year 2013 budget request includes no funding for Harbor Yard Tugs. The Committee notes that the last procurement of Harbor Yard Tugs was in fiscal year 2009 and is concerned about the impact of this acquisition pause on the industrial base. The Committee directs the Assistant Secretary of the Navy for Research, Development and Acquisition to submit to the congressional defense committees a report on the long range strategy for Harbor Yard Tugs, to include the potential application of hybrid technology, with the fiscal year 2014 budget submission. Other Procurement, Navy Appropriations, 2012.................................... $6,013,385,000 Budget estimate, 2013................................... 6,169,378,000 House allowance......................................... 6,364,191,000 Committee recommendation................................ 6,170,286,000 The Committee recommends an appropriation of $6,170,286,000. This is $908,000 above the budget estimate. committee recommended program The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [Dollars in thousands] ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Change from Change from Line Item Qty. 2013 budget Qty. House allowance Qty. Committee ----------------------------------------------------- estimate recommendation Qty. Budget estimate Qty. House allowance ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ OTHER PROCUREMENT, NAVY SHIPS SUPPORT EQUIPMENT SHIP PROPULSION EQUIPMENT 1 LM-2500 GAS TURBINE ....... $10,658 ....... $10,658 ....... $10,658 ....... ............... ......... ............... 2 ALLISON 501K GAS TURBINE ....... 8,469 ....... 3,983 ....... 8,469 ....... ............... ......... +$4,486 NAVIGATION EQUIPMENT 3 OTHER NAVIGATION EQUIPMENT ....... 23,392 ....... 23,392 ....... 23,392 ....... ............... ......... ............... PERISCOPES 4 SUB PERISCOPES & IMAGING EQUIP ....... 53,809 ....... 52,609 ....... 53,809 ....... ............... ......... +1,200 OTHER SHIPBOARD EQUIPMENT 5 DDG MOD ....... 452,371 ....... 412,656 ....... 452,371 ....... ............... ......... +39,715 6 FIREFIGHTING EQUIPMENT ....... 16,958 ....... 9,099 ....... 16,958 ....... ............... ......... +7,859 7 COMMAND AND CONTROL SWITCHBOARD ....... 2,492 ....... 2,492 ....... 2,492 ....... ............... ......... ............... 8 POLLUTION CONTROL EQUIPMENT ....... 20,707 ....... 18,498 ....... 20,707 ....... ............... ......... +2,209 9 SUBMARINE SUPPORT EQUIPMENT ....... 12,046 ....... 12,046 ....... 24,546 ....... +$12,500 ......... +12,500 10 VIRGINIA CLASS SUPPORT EQUIPMENT ....... 79,870 ....... 77,458 ....... 79,870 ....... ............... ......... +2,412 11 LCS CLASS SUPPORT EQUIPMENT ....... 19,865 ....... 9,300 ....... 19,865 ....... ............... ......... +10,565 12 SUBMARINE BATTERIES ....... 41,522 ....... 40,058 ....... 41,522 ....... ............... ......... +1,464 13 LPD CLASS SUPPORT EQUIPMENT ....... 30,543 ....... 28,048 ....... 30,543 ....... ............... ......... +2,495 14 STRATEGIC PLATFORM SUPPORT EQUIP ....... 16,257 ....... 16,257 ....... 16,257 ....... ............... ......... ............... 15 DSSP EQUIPMENT ....... 3,630 ....... 3,630 ....... 3,630 ....... ............... ......... ............... 16 CG-MODERNIZATION ....... 101,000 ....... 607,660 ....... 101,000 ....... ............... ......... -506,660 17 LCAC ....... 16,645 ....... 16,645 ....... 16,645 ....... ............... ......... ............... 18 UNDERWATER EOD PROGRAMS ....... 35,446 ....... 33,318 ....... 35,446 ....... ............... ......... +2,128 19 ITEMS LESS THAN $5 MILLION ....... 65,998 ....... 59,026 ....... 65,998 ....... ............... ......... +6,972 20 CHEMICAL WARFARE DETECTORS ....... 4,359 ....... 4,359 ....... 4,359 ....... ............... ......... ............... 21 SUBMARINE LIFE SUPPORT SYSTEM ....... 10,218 ....... 6,610 ....... 10,218 ....... ............... ......... +3,608 REACTOR PLANT EQUIPMENT 22 REACTOR POWER UNITS ....... 286,859 ....... 286,859 ....... 286,859 ....... ............... ......... ............... 23 REACTOR COMPONENTS ....... 278,503 ....... 278,503 ....... 278,503 ....... ............... ......... ............... OCEAN ENGINEERING 24 DIVING AND SALVAGE EQUIPMENT ....... 8,998 ....... 8,998 ....... 8,998 ....... ............... ......... ............... SMALL BOATS 25 STANDARD BOATS ....... 30,131 ....... 30,131 ....... 30,131 ....... ............... ......... ............... TRAINING EQUIPMENT 26 OTHER SHIPS TRAINING EQUIPMENT ....... 29,772 ....... 29,772 ....... 29,772 ....... ............... ......... ............... PRODUCTION FACILITIES EQUIPMENT 27 OPERATING FORCES IPE ....... 64,346 ....... 104,346 ....... 104,346 ....... +40,000 ......... ............... OTHER SHIP SUPPORT 28 NUCLEAR ALTERATIONS ....... 154,652 ....... 154,652 ....... 154,652 ....... ............... ......... ............... 29 LCS MODULES ....... 31,319 ....... 31,319 ....... 31,319 ....... ............... ......... ............... 30 LCS MCM MISSION MODULES ....... 38,392 ....... 38,392 ....... 38,392 ....... ............... ......... ............... 31 LCS SUW MISSION MODULES ....... 32,897 ....... 32,897 ....... 32,897 ....... ............... ......... ............... LOGISTICS SUPPORT 32 LSD MIDLIFE ....... 49,758 ....... 23,951 ....... 49,758 ....... ............... ......... +25,807 ------------------------------------------------------------------------------------------------------------------------------------- TOTAL, SHIPS SUPPORT EQUIPMENT ....... 2,031,882 ....... 2,467,622 ....... 2,084,382 ....... +52,500 ......... -383,240 COMMUNICATIONS AND ELECTRONICS EQUIPMENT SHIP RADARS SHIP SONARS 34 SPQ-9B RADAR ....... 19,777 ....... 19,777 ....... 19,777 ....... ............... ......... ............... 35 AN/SQQ-89 SURF ASW COMBAT SYSTEM ....... 89,201 ....... 88,201 ....... 89,201 ....... ............... ......... +1,000 36 SSN ACOUSTICS ....... 190,874 ....... 190,874 ....... 190,874 ....... ............... ......... ............... 37 UNDERSEA WARFARE SUPPORT EQUIPMENT ....... 17,035 ....... 17,035 ....... 17,035 ....... ............... ......... ............... 38 SONAR SWITCHES AND TRANSDUCERS ....... 13,410 ....... 13,410 ....... 13,410 ....... ............... ......... ............... ASW ELECTRONIC EQUIPMENT 40 SUBMARINE ACOUSTIC WARFARE SYSTEM ....... 21,489 ....... 15,657 ....... 19,489 ....... -2,000 ......... +3,832 41 SSTD ....... 10,716 ....... 10,716 ....... 10,716 ....... ............... ......... ............... 42 FIXED SURVEILLANCE SYSTEM ....... 98,896 ....... 98,896 ....... 98,896 ....... ............... ......... ............... 43 SURTASS ....... 2,774 ....... 2,774 ....... 2,774 ....... ............... ......... ............... 44 TACTICAL SUPPORT CENTER ....... 18,428 ....... 18,428 ....... 18,428 ....... ............... ......... ............... ELECTRONIC WARFARE EQUIPMENT 45 AN/SLQ-32 ....... 92,270 ....... 71,978 ....... 92,270 ....... ............... ......... +20,292 RECONNAISSANCE EQUIPMENT 46 SHIPBOARD IW EXPLOIT ....... 107,060 ....... 97,064 ....... 107,060 ....... ............... ......... +9,996 47 AUTOMATED IDENTIFICATION SYSTEM [AIS] ....... 914 ....... 914 ....... 914 ....... ............... ......... ............... SUBMARINE SURVEILLANCE EQUIPMENT 48 SUBMARINE SUPPORT EQUIPMENT PROG ....... 34,050 ....... 34,050 ....... 34,050 ....... ............... ......... ............... OTHER SHIP ELECTRONIC EQUIPMENT 49 COOPERATIVE ENGAGEMENT CAPABILITY ....... 27,881 ....... 22,191 ....... 17,981 ....... -9,900 ......... -4,210 50 TRUSTED INFORMATION SYSTEM [TIS] ....... 448 ....... 448 ....... 448 ....... ............... ......... ............... 51 NAVAL TACTICAL COMMAND SUPPORT SYSTEM [NTCSS] ....... 35,732 ....... 33,737 ....... 35,732 ....... ............... ......... +1,995 53 NAVY COMMAND AND CONTROL SYSTEM [NCCS] ....... 9,533 ....... 9,533 ....... 9,533 ....... ............... ......... ............... 54 MINESWEEPING SYSTEM REPLACEMENT ....... 60,111 ....... 45,654 ....... 60,111 ....... ............... ......... +14,457 55 SHALLOW WATER MCM ....... 6,950 ....... 6,950 ....... 6,950 ....... ............... ......... ............... 56 NAVSTAR GPS RECEIVERS (SPACE) ....... 9,089 ....... 9,089 ....... 9,089 ....... ............... ......... ............... 57 ARMED FORCES RADIO AND TV ....... 7,768 ....... 5,568 ....... 7,768 ....... ............... ......... +2,200 58 STRATEGIC PLATFORM SUPPORT EQUIP ....... 3,614 ....... 3,614 ....... 3,614 ....... ............... ......... ............... TRAINING EQUIPMENT 59 OTHER TRAINING EQUIPMENT ....... 42,911 ....... 41,421 ....... 42,911 ....... ............... ......... +1,490 AVIATION ELECTRONIC EQUIPMENT 60 MATCALS ....... 5,861 ....... 5,861 ....... 5,861 ....... ............... ......... ............... 61 SHIPBOARD AIR TRAFFIC CONTROL ....... 8,362 ....... 8,362 ....... 8,362 ....... ............... ......... ............... 62 AUTOMATIC CARRIER LANDING SYSTEM ....... 15,685 ....... 13,623 ....... 15,685 ....... ............... ......... +2,062 63 NATIONAL AIR SPACE SYSTEM ....... 16,919 ....... 14,512 ....... 16,919 ....... ............... ......... +2,407 64 AIR STATION SUPPORT EQUIPMENT ....... 6,828 ....... 6,828 ....... 6,828 ....... ............... ......... ............... 65 MICROWAVE LANDING SYSTEM ....... 7,646 ....... 7,646 ....... 7,646 ....... ............... ......... ............... 66 ID SYSTEMS ....... 35,474 ....... 29,856 ....... 35,474 ....... ............... ......... +5,618 67 TAC A/C MISSION PLANNING SYS [TAMPS] ....... 9,958 ....... 9,958 ....... 9,958 ....... ............... ......... ............... OTHER SHORE ELECTRONIC EQUIPMENT 68 DEPLOYABLE JOINT COMMAND AND CONT ....... 9,064 ....... 9,064 ....... 9,064 ....... ............... ......... ............... 69 TADIX-B ....... 16,026 ....... 14,882 ....... 16,026 ....... ............... ......... +1,144 70 GCCS-M EQUIPMENT TACTICAL/MOBILE ....... 11,886 ....... 11,886 ....... 11,886 ....... ............... ......... ............... 71 DCGS-N ....... 11,887 ....... 11,887 ....... 11,887 ....... ............... ......... ............... 72 CANES ....... 341,398 ....... 320,874 ....... 320,874 ....... -20,524 ......... ............... 73 RADIAC ....... 8,083 ....... 8,083 ....... 8,083 ....... ............... ......... ............... 74 CANES-INTELL ....... 79,427 ....... 67,956 ....... 79,427 ....... ............... ......... +11,471 75 GPETE ....... 6,083 ....... 6,083 ....... 6,083 ....... ............... ......... ............... 76 INTEG COMBAT SYSTEM TEST FACILITY ....... 4,495 ....... 4,495 ....... 4,495 ....... ............... ......... ............... 77 EMI CONTROL INSTRUMENTATION ....... 4,767 ....... 4,767 ....... 4,767 ....... ............... ......... ............... 78 ITEMS LESS THAN $5 MILLION ....... 81,755 ....... 60,555 ....... 81,755 ....... ............... ......... +21,200 SHIPBOARD COMMUNICATIONS 80 SHIP COMMUNICATIONS AUTOMATION ....... 56,870 ....... 55,166 ....... 56,870 ....... ............... ......... +1,704 81 MARITIME DOMAIN AWARENESS [MDA] ....... 1,063 ....... 1,063 ....... 1,063 ....... ............... ......... ............... 82 COMMUNICATIONS ITEMS UNDER $5M ....... 28,522 ....... 28,522 ....... 28,522 ....... ............... ......... ............... SUBMARINE COMMUNICATIONS 83 SUBMARINE BROADCAST SUPPORT ....... 4,183 ....... 4,183 ....... 4,183 ....... ............... ......... ............... 84 SUBMARINE COMMUNICATION EQUIPMENT ....... 69,025 ....... 63,423 ....... 69,025 ....... ............... ......... +5,602 SATELLITE COMMUNICATIONS 85 SATELLITE COMMUNICATIONS SYSTEMS ....... 49,294 ....... 49,294 ....... 49,294 ....... ............... ......... ............... 86 NAVY MULTIBAND TERMINAL [NMT] ....... 184,825 ....... 124,612 ....... 184,825 ....... ............... ......... +60,213 SHORE COMMUNICATIONS 87 JCS COMMUNICATIONS EQUIPMENT ....... 2,180 ....... 2,180 ....... 2,180 ....... ............... ......... ............... 88 ELECTRICAL POWER SYSTEMS ....... 1,354 ....... 1,354 ....... 1,354 ....... ............... ......... ............... CRYPTOGRAPHIC EQUIPMENT 90 INFO SYSTEMS SECURITY PROGRAM [ISSP] ....... 144,104 ....... 142,193 ....... 144,104 ....... ............... ......... +1,911 CRYPTOLOGIC EQUIPMENT 91 CRYPTOLOGIC COMMUNICATIONS EQUIP ....... 12,604 ....... 12,604 ....... 12,604 ....... ............... ......... ............... OTHER ELECTRONIC SUPPORT 92 COAST GUARD EQUIPMENT ....... 6,680 ....... 6,680 ....... 6,680 ....... ............... ......... ............... ------------------------------------------------------------------------------------------------------------------------------------- TOTAL, COMMUNICATIONS AND ELECTRONICS EQUIPMENT ....... 2,163,239 ....... 1,966,431 ....... 2,130,815 ....... -32,424 ......... +164,384 AVIATION SUPPORT EQUIPMENT SONOBUOYS 95 SONOBUOYS--ALL TYPES ....... 104,677 ....... 104,677 ....... 104,677 ....... ............... ......... ............... AIRCRAFT SUPPORT EQUIPMENT 96 WEAPONS RANGE SUPPORT EQUIPMENT ....... 70,753 ....... 67,253 ....... 85,753 ....... +15,000 ......... +18,500 97 EXPEDITIONARY AIRFIELDS ....... 8,678 ....... 8,678 ....... 8,678 ....... ............... ......... ............... 98 AIRCRAFT REARMING EQUIPMENT ....... 11,349 ....... 9,269 ....... 11,349 ....... ............... ......... +2,080 99 AIRCRAFT LAUNCH & RECOVERY EQUIPMENT ....... 82,618 ....... 81,980 ....... 72,618 ....... -10,000 ......... -9,362 100 METEOROLOGICAL EQUIPMENT ....... 18,339 ....... 18,339 ....... 18,339 ....... ............... ......... ............... 101 OTHER PHOTOGRAPHIC EQUIPMENT ....... 1,414 ....... 1,414 ....... 1,414 ....... ............... ......... ............... 102 AVIATION LIFE SUPPORT ....... 40,475 ....... 38,675 ....... 40,475 ....... ............... ......... +1,800 103 AIRBORNE MINE COUNTERMEASURES ....... 61,552 ....... 59,552 ....... 61,552 ....... ............... ......... +2,000 104 LAMPS MK III SHIPBOARD EQUIPMENT ....... 18,771 ....... 17,614 ....... 18,771 ....... ............... ......... +1,157 105 PORTABLE ELECTRONIC MAINTENANCE AIDS ....... 7,954 ....... 7,954 ....... 7,954 ....... ............... ......... ............... 106 OTHER AVIATION SUPPORT EQUIPMENT ....... 10,023 ....... 8,377 ....... 10,023 ....... ............... ......... +1,646 107 AUTONOMIC LOGISTICS INFORMATION SYSTEM [ALIS] ....... 3,826 ....... 3,826 ....... 3,826 ....... ............... ......... ............... ------------------------------------------------------------------------------------------------------------------------------------- TOTAL, AVIATION SUPPORT EQUIPMENT ....... 440,429 ....... 427,608 ....... 445,429 ....... +5,000 ......... +17,821 ORDNANCE SUPPORT EQUIPMENT SHIP GUN SYSTEM EQUIPMENT 108 NAVAL FIRES CONTROL SYSTEM ....... 3,472 ....... 3,472 ....... 3,472 ....... ............... ......... ............... 109 GUN FIRE CONTROL EQUIPMENT ....... 4,528 ....... 4,528 ....... 4,528 ....... ............... ......... ............... SHIP MISSILE SYSTEMS EQUIPMENT 110 NATO SEASPARROW ....... 8,960 ....... 8,960 ....... 8,960 ....... ............... ......... ............... 111 RAM GMLS ....... 1,185 ....... 1,185 ....... 1,185 ....... ............... ......... ............... 112 SHIP SELF DEFENSE SYSTEM ....... 55,371 ....... 53,073 ....... 55,371 ....... ............... ......... +2,298 113 AEGIS SUPPORT EQUIPMENT ....... 81,614 ....... 78,614 ....... 81,614 ....... ............... ......... +3,000 114 TOMAHAWK SUPPORT EQUIPMENT ....... 77,767 ....... 72,267 ....... 68,117 ....... -9,650 ......... -4,150 115 VERTICAL LAUNCH SYSTEMS ....... 754 ....... 754 ....... 754 ....... ............... ......... ............... 116 MARITIME INTEGRATED PLANNING SYSTEM--MIPS ....... 4,965 ....... 3,965 ....... 4,965 ....... ............... ......... +1,000 FBM SUPPORT EQUIPMENT 117 STRATEGIC MISSILE SYSTEMS EQUIP ....... 181,049 ....... 173,549 ....... 181,049 ....... ............... ......... +7,500 ASW SUPPORT EQUIPMENT 118 SSN COMBAT CONTROL SYSTEMS ....... 71,316 ....... 71,316 ....... 71,316 ....... ............... ......... ............... 119 SUBMARINE ASW SUPPORT EQUIPMENT ....... 4,018 ....... 4,018 ....... 4,018 ....... ............... ......... ............... 120 SURFACE ASW SUPPORT EQUIPMENT ....... 6,465 ....... 6,465 ....... 6,465 ....... ............... ......... ............... 121 ASW RANGE SUPPORT EQUIPMENT ....... 47,930 ....... 47,930 ....... 47,930 ....... ............... ......... ............... OTHER ORDNANCE SUPPORT EQUIPMENT 122 EXPLOSIVE ORDNANCE DISPOSAL EQUIP ....... 3,579 ....... 3,579 ....... 3,579 ....... ............... ......... ............... 123 ITEMS LESS THAN $5 MILLION ....... 3,125 ....... 3,125 ....... 3,125 ....... ............... ......... ............... OTHER EXPENDABLE ORDNANCE 124 ANTI-SHIP MISSILE DECOY SYSTEM ....... 31,743 ....... 29,743 ....... 29,743 ....... -2,000 ......... ............... 125 SURFACE TRAINING DEVICE MODS ....... 34,174 ....... 34,174 ....... 34,174 ....... ............... ......... ............... 126 SUBMARINE TRAINING DEVICE MODS ....... 23,450 ....... 23,450 ....... 23,450 ....... ............... ......... ............... ------------------------------------------------------------------------------------------------------------------------------------- TOTAL, ORDNANCE SUPPORT EQUIPMENT ....... 645,465 ....... 624,167 ....... 633,815 ....... -11,650 ......... +9,648 CIVIL ENGINEERING SUPPORT EQUIPMENT 127 PASSENGER CARRYING VEHICLES ....... 7,158 ....... 7,158 ....... 7,158 ....... ............... ......... ............... 128 GENERAL PURPOSE TRUCKS ....... 3,325 ....... 3,325 ....... 3,325 ....... ............... ......... ............... 129 CONSTRUCTION & MAINTENANCE EQUIP ....... 8,692 ....... 8,692 ....... 8,692 ....... ............... ......... ............... 130 FIRE FIGHTING EQUIPMENT ....... 14,533 ....... 14,533 ....... 14,533 ....... ............... ......... ............... 131 TACTICAL VEHICLES ....... 15,330 ....... 15,330 ....... 15,330 ....... ............... ......... ............... 132 AMPHIBIOUS EQUIPMENT ....... 10,803 ....... 10,803 ....... 10,803 ....... ............... ......... ............... 133 POLLUTION CONTROL EQUIPMENT ....... 7,265 ....... 7,265 ....... 7,265 ....... ............... ......... ............... 134 ITEMS UNDER $5 MILLION ....... 15,252 ....... 15,252 ....... 15,252 ....... ............... ......... ............... 135 PHYSICAL SECURITY VEHICLES ....... 1,161 ....... 1,161 ....... 1,161 ....... ............... ......... ............... ------------------------------------------------------------------------------------------------------------------------------------- TOTAL, CIVIL ENGINEERING SUPPORT EQUIPMENT ....... 83,519 ....... 83,519 ....... 83,519 ....... ............... ......... SUPPLY SUPPORT EQUIPMENT SUPPLY SUPPORT EQUIPMENT 136 MATERIALS HANDLING EQUIPMENT ....... 15,204 ....... 15,204 ....... 15,204 ....... ............... ......... ............... 137 OTHER SUPPLY SUPPORT EQUIPMENT ....... 6,330 ....... 6,330 ....... 6,330 ....... ............... ......... ............... 138 FIRST DESTINATION TRANSPORTATION ....... 6,539 ....... 6,539 ....... 6,539 ....... ............... ......... ............... 139 SPECIAL PURPOSE SUPPLY SYSTEMS ....... 34,804 ....... 34,804 ....... 22,286 ....... -12,518 ......... -12,518 ------------------------------------------------------------------------------------------------------------------------------------- TOTAL, SUPPLY SUPPORT EQUIPMENT ....... 62,877 ....... 62,877 ....... 50,359 ....... -12,518 ......... -12,518 PERSONNEL AND COMMAND SUPPORT EQUIPMENT TRAINING DEVICES 140 TRAINING SUPPORT EQUIPMENT ....... 25,444 ....... 25,444 ....... 25,444 ....... ............... ......... ............... COMMAND SUPPORT EQUIPMENT 141 COMMAND SUPPORT EQUIPMENT ....... 43,165 ....... 43,165 ....... 43,165 ....... ............... ......... ............... 142 EDUCATION SUPPORT EQUIPMENT ....... 2,251 ....... 2,251 ....... 2,251 ....... ............... ......... ............... 143 MEDICAL SUPPORT EQUIPMENT ....... 3,148 ....... 3,148 ....... 3,148 ....... ............... ......... ............... 146 NAVAL MIP SUPPORT EQUIPMENT ....... 3,502 ....... 3,502 ....... 3,502 ....... ............... ......... ............... 148 OPERATING FORCES SUPPORT EQUIPMENT ....... 15,696 ....... 15,696 ....... 15,696 ....... ............... ......... ............... 149 C4ISR EQUIPMENT ....... 4,344 ....... 4,344 ....... 4,344 ....... ............... ......... ............... 150 ENVIRONMENTAL SUPPORT EQUIPMENT ....... 19,492 ....... 19,492 ....... 19,492 ....... ............... ......... ............... 151 PHYSICAL SECURITY EQUIPMENT ....... 177,149 ....... 177,149 ....... 177,149 ....... ............... ......... ............... 152 ENTERPRISE INFORMATION TECHNOLOGY ....... 183,995 ....... 183,995 ....... 183,995 ....... ............... ......... ............... ------------------------------------------------------------------------------------------------------------------------------------- TOTAL, PERSONNEL AND COMMAND SUPPORT EQUIPMENT ....... 478,186 ....... 478,186 ....... 478,186 ....... ............... ......... 153 SPARES AND REPAIR PARTS ....... 250,718 ....... 240,718 ....... 250,718 ....... ............... ......... +10,000 CLASSIFIED PROGRAMS ....... 13,063 ....... 13,063 ....... 13,063 ....... ............... ......... ............... ------------------------------------------------------------------------------------------------------------------------------------- TOTAL, OTHER PROCUREMENT, NAVY ....... 6,169,378 ....... 6,364,191 ....... 6,170,286 ....... +908 ......... -193,905 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ COMMITTEE RECOMMENDED ADJUSTMENTS The following table details the adjustments recommended by the Committee: [In thousands of dollars] ---------------------------------------------------------------------------------------------------------------- 2013 budget Committee Change from Line Item estimate recommendation budget estimate ---------------------------------------------------------------------------------------------------------------- 9 Submarine Support Equipment 12,046 24,546 +12,500 Materials research and technology ............... ............... +12,500 27 Operating Forces IPE 64,346 104,346 +40,000 Shipyard Capital investment program ............... ............... +40,000 40 Submarine Acoustic Warfare System 21,489 19,489 -2,000 Contract award delays for launch tube and MK3 ............... ............... -2,000 49 Cooperative Engagement Capability 27,881 17,981 -9,900 Early need to install ............... ............... -9,900 72 CANES 341,398 320,874 -20,524 Contract award delay and protest ............... ............... -20,524 96 Weapons Range Support Equipment 70,753 85,753 +15,000 Test and Training Range Upgrades ............... ............... +15,000 99 Aircraft Launch and Recovery Equipment 82,618 72,618 -10,000 Unjustified cost growth for kit purchase ............... ............... -10,000 114 Tomahawk Support Equipment 77,767 68,117 -9,650 Production support funding growth ............... ............... -9,650 124 Anti-Ship Missile Decoy System 31,743 29,743 -2,000 Installation cost growth ............... ............... -2,000 139 Special Purpose Supply Systems 34,804 22,286 -12,518 Excess to need ............... ............... -12,518 ---------------------------------------------------------------------------------------------------------------- Submarine Combat Control Systems Procurement.--The fiscal year 2013 budget request includes $71,316,000 for Navy Submarine Combat Control Systems. The program is responsible for the Submarine Force's Technology Insertion [TI] and Advanced Processor Build [APB] modernization process. This program continues to be a model of efficient, effective, and rapid response to submarine warfighter combat system, sonar, and imaging needs. This program utilizes a flexible and forward-thinking methodology which enables the rapid introduction of fleet requirements and capability via an alternating biannual hardware and software modernization process which facilitates a stable industrial base. The TI/APB modernization process provides the submarine force with enhanced warfighting capabilities while avoiding significant research, design, acquisition, obsolescence, and training costs by transitioning three classes of attack submarines and the four guided missile submarines to a common baseline. Procurement, Marine Corps Appropriations, 2012.................................... $1,422,570,000 Budget estimate, 2013................................... 1,622,955,000 House allowance......................................... 1,482,081,000 Committee recommendation................................ 1,334,448,000 The Committee recommends an appropriation of $1,334,448,000. This is $288,507,000 below the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [Dollars in thousands] ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Change from Change from Line Item Qty. 2013 budget Qty. House allowance Qty. Committee --------------------------------------------------- estimate recommendation Qty. Budget estimate Qty. House allowance ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ PROCUREMENT, MARINE CORPS WEAPONS AND COMBAT VEHICLES TRACKED COMBAT VEHICLES 1 AAV7A1 PIP ....... $16,089 ....... $16,089 ....... $16,089 ....... ............... ....... ............... 2 LAV PIP ....... 186,216 ....... 45,342 ....... 45,342 ....... -$140,874 ....... ............... ARTILLERY AND OTHER WEAPONS 3 EXPEDITIONARY FIRE SUPPORT SYSTEM ....... 2,502 7 2,502 ....... 2,502 ....... ............... -7 ............... 4 155MM LIGHTWEIGHT TOWED HOWITZER ....... 17,913 ....... 17,913 ....... 17,913 ....... ............... ....... ............... 5 HIGH MOBILITY ARTILLERY ROCKET SYSTEM ....... 47,999 ....... 47,999 ....... 7,107 ....... -40,892 ....... -$40,892 6 WEAPONS AND COMBAT VEHICLES UNDER $5 MILLION ....... 17,706 ....... 17,706 ....... 2,298 ....... -15,408 ....... -15,408 OTHER SUPPORT 7 MODIFICATION KITS ....... 48,040 ....... 48,040 ....... 34,145 ....... -13,895 ....... -13,895 8 WEAPONS ENHANCEMENT PROGRAM ....... 4,537 ....... 4,537 ....... 4,537 ....... ............... ....... ............... ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, WEAPONS AND COMBAT VEHICLES ....... 341,002 ....... 200,128 ....... 129,933 ....... -211,069 ....... -70,195 GUIDED MISSILES AND EQUIPMENT GUIDED MISSILES 9 GROUND BASED AIR DEFENSE ....... 11,054 ....... 11,054 ....... 11,054 ....... ............... ....... ............... 11 FOLLOW ON TO SMAW ....... 19,650 ....... 19,650 ....... 19,650 ....... ............... ....... ............... 12 ANTI-ARMOR WEAPONS SYSTEM-HEAVY [AAWS-H] ....... 20,708 ....... 20,708 ....... 20,162 ....... -546 ....... -546 OTHER SUPPORT ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, GUIDED MISSILES AND EQUIPMENT ....... 51,412 ....... 51,412 ....... 50,866 ....... -546 ....... -546 COMMUNICATIONS AND ELECTRONICS EQUIPMENT COMMAND AND CONTROL SYSTEMS 14 COMBAT OPERATIONS CENTER ....... 1,420 ....... 1,420 ....... 1,420 ....... ............... ....... ............... REPAIR AND TEST EQUIPMENT 15 REPAIR AND TEST EQUIPMENT ....... 25,127 ....... 25,127 ....... 25,127 ....... ............... ....... ............... OTHER SUPPORT (TEL) 16 COMBAT SUPPORT SYSTEM ....... 25,822 ....... 25,822 ....... 19,822 ....... -6,000 ....... -6,000 17 MODIFICATION KITS ....... 2,831 ....... 2,831 ....... 2,831 ....... ............... ....... ............... COMMAND AND CONTROL 18 ITEMS UNDER $5 MILLION (COMM & ELEC) ....... 5,498 ....... 5,498 ....... 5,498 ....... ............... ....... ............... 19 AIR OPERATIONS C2 SYSTEMS ....... 11,290 ....... 11,290 ....... 11,290 ....... ............... ....... ............... RADAR + EQUIPMENT (NON-TEL) 20 RADAR SYSTEMS ....... 128,079 ....... 128,079 ....... 128,079 ....... ............... ....... ............... 21 RQ-21 UAS 5 27,619 ....... 27,619 ....... ............... -5 -27,619 ....... -27,619 INTELL/COMM EQUIPMENT (NON-TEL) 22 FIRE SUPPORT SYSTEM ....... 7,319 ....... 7,319 ....... 7,319 ....... ............... ....... ............... 23 INTELLIGENCE SUPPORT EQUIPMENT ....... 7,466 ....... 7,466 ....... 7,466 ....... ............... ....... ............... 25 RQ-11 UAV ....... 2,318 ....... 2,318 ....... 2,318 ....... ............... ....... ............... 26 DCGS-MC ....... 18,291 ....... 18,291 ....... 12,291 ....... -6,000 ....... -6,000 OTHER COMM/ELEC EQUIPMENT (NON-TEL) 29 NIGHT VISION EQUIPMENT ....... 48,084 ....... 48,084 ....... 43,884 ....... -4,200 ....... -4,200 OTHER SUPPORT (NON-TEL) 30 COMMON COMPUTER RESOURCES ....... 206,708 ....... 206,708 ....... 206,708 ....... ............... ....... ............... 31 COMMAND POST SYSTEMS ....... 35,190 ....... 35,190 ....... 35,190 ....... ............... ....... ............... 32 RADIO SYSTEMS ....... 89,059 ....... 89,059 ....... 89,059 ....... ............... ....... ............... 33 COMM SWITCHING & CONTROL SYSTEMS ....... 22,500 ....... 22,500 ....... 22,500 ....... ............... ....... ............... 34 COMM & ELEC INFRASTRUCTURE SUPPORT ....... 42,625 ....... 42,625 ....... 42,625 ....... ............... ....... ............... CLASSIFIED PROGRAMS ....... 2,290 ....... 2,290 ....... 2,290 ....... ............... ....... ............... ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, COMMUNICATIONS AND ELECTRONICS EQUIPMENT ....... 709,536 ....... 709,536 ....... 665,717 ....... -43,819 ....... -43,819 SUPPORT VEHICLES ADMINISTRATIVE VEHICLES 35 COMMERCIAL PASSENGER VEHICLES ....... 2,877 ....... 2,877 ....... 2,877 ....... ............... ....... ............... 36 COMMERCIAL CARGO VEHICLES ....... 13,960 ....... 13,960 ....... 13,960 ....... ............... ....... ............... TACTICAL VEHICLES 37 5/4T TRUCK HMMWV (MYP) ....... 8,052 ....... 8,052 ....... 8,052 ....... ............... ....... ............... 38 MOTOR TRANSPORT MODIFICATIONS ....... 50,269 ....... 50,269 ....... 50,269 ....... ............... ....... ............... 40 LOGISTICS VEHICLE SYSTEM REP 8 37,262 8 37,262 ....... 33,962 -8 -3,300 -8 -3,300 41 FAMILY OF TACTICAL TRAILERS ....... 48,160 ....... 48,160 ....... 48,160 ....... ............... ....... ............... OTHER SUPPORT 43 ITEMS LESS THAN $5 MILLION ....... 6,705 ....... 6,705 ....... 6,705 ....... ............... ....... ............... ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, SUPPORT VEHICLES ....... 167,285 ....... 167,285 ....... 163,985 ....... -3,300 ....... -3,300 ENGINEER AND OTHER EQUIPMENT ENGINEER AND OTHER EQUIPMENT 44 ENVIRONMENTAL CONTROL EQUIP ASSORT ....... 13,576 ....... 13,576 ....... 13,576 ....... ............... ....... ............... 45 BULK LIQUID EQUIPMENT ....... 16,869 ....... 16,869 ....... 16,869 ....... ............... ....... ............... 46 TACTICAL FUEL SYSTEMS ....... 19,108 ....... 19,108 ....... 19,108 ....... ............... ....... ............... 47 POWER EQUIPMENT ASSORTED ....... 56,253 ....... 56,253 ....... 26,480 ....... -29,773 ....... -29,773 48 AMPHIBIOUS SUPPORT EQUIPMENT ....... 13,089 ....... 13,089 ....... 13,089 ....... ............... ....... ............... 49 EOD SYSTEMS ....... 73,699 ....... 73,699 ....... 73,699 ....... ............... ....... ............... MATERIALS HANDLING EQUIPMENT 50 PHYSICAL SECURITY EQUIPMENT ....... 3,510 ....... 3,510 ....... 3,510 ....... ............... ....... ............... 51 GARRISON MOBILE ENGR EQUIP ....... 11,490 ....... 11,490 ....... 11,490 ....... ............... ....... ............... 52 MATERIAL HANDLING EQUIP ....... 20,659 ....... 20,659 ....... 20,659 ....... ............... ....... ............... 53 FIRST DESTINATION TRANSPORTATION ....... 132 ....... 132 ....... 132 ....... ............... ....... ............... GENERAL PROPERTY 54 FIELD MEDICAL EQUIPMENT ....... 31,068 ....... 31,068 ....... 31,068 ....... ............... ....... ............... 55 TRAINING DEVICES ....... 45,895 ....... 45,895 ....... 45,895 ....... ............... ....... ............... 56 CONTAINER FAMILY ....... 5,801 ....... 5,801 ....... 5,801 ....... ............... ....... ............... 57 FAMILY OF CONSTRUCTION EQUIPMENT ....... 23,939 ....... 23,939 ....... 23,939 ....... ............... ....... ............... 60 RAPID DEPLOYABLE KITCHEN ....... 8,365 ....... 8,365 ....... 8,365 ....... ............... ....... ............... OTHER SUPPORT 61 ITEMS LESS THAN $5 MILLION ....... 7,077 ....... 7,077 ....... 7,077 ....... ............... ....... ............... ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, ENGINEER AND OTHER EQUIPMENT ....... 350,530 ....... 350,530 ....... 320,757 ....... -29,773 ....... -29,773 62 SPARES AND REPAIR PARTS ....... 3,190 ....... 3,190 ....... 3,190 ....... ............... ....... ............... ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, PROCUREMENT, MARINE CORPS ....... 1,622,955 ....... 1,482,081 ....... 1,334,448 ....... -288,507 ....... -147,633 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ COMMITTEE RECOMMENDED ADJUSTMENTS The following table details the adjustments recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ 2 LAV PIP 186,216 45,342 -140,874 Marine .............. .............. -140,874 Corps Requested Transfer to Title I: Military Personnel, Marine Corps and Title II: Operation and Maintenanc e, Marine Corps 5 High Mobility 47,999 7,107 -40,892 Artillery Rocket System Marine .............. .............. -40,892 Corps Requested Transfer to Title IX: Aircraft Procuremen t, Navy 6 Weapons and 17,706 2,298 -15,408 Combat Vehicles Under $5,000,000 CQBP .............. .............. -11,124 Transfer to Title IX Scout .............. .............. -4,284 Sniper Excess to Requiremen t 7 Modification 48,040 34,145 -13,895 Kits Abrams .............. .............. -13,895 Suspension Unit Cost Growth 12 Anti-Armor 20,708 20,162 -546 Weapons System--Heavy [AAWS-H] Unit Cost .............. .............. -546 Growth 16 Combat Support 25,822 19,822 -6,000 System GCSS .............. .............. -6,000 Program Delay 21 RQ-21 UAS 27,619 .............. -27,619 Program .............. .............. -27,619 Adjustment 26 DCGS-MC 18,291 12,291 -6,000 Prior Year .............. .............. -6,000 Unobligate d Balances 29 Night Vision 48,084 43,884 -4,200 Equipment Squad .............. .............. -4,200 Thermal System--Pr ogram Delay 40 Logistics 37,262 33,962 -3,300 Vehicle System Rep Transfer to .............. .............. -3,300 Title IX 47 Power Equipment 56,253 26,480 -29,773 Assorted APSCE and .............. .............. -29,773 MEPDIS-R Transfer to Title IX ------------------------------------------------------------------------ Aircraft Procurement, Air Force Appropriations, 2012.................................... $12,950,000,000 Budget estimate, 2013................................... 11,002,999,000 House allowance......................................... 11,320,899,000 Committee recommendation................................ 11,260,646,000 The Committee recommends an appropriation of $11,260,646,000. This is $257,647,000 above the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [Dollars in thousands] ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Change from Change from Line Item Qty. 2013 budget Qty. House allowance Qty. Committee --------------------------------------------------- estimate recommendation Qty. Budget estimate Qty. House allowance ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ AIRCRAFT PROCUREMENT, AIR FORCE COMBAT AIRCRAFT TACTICAL FORCES 1 F-35 19 $3,124,302 19 $2,951,002 19 $3,124,302 ....... ............... ....... +$173,300 2 F-35 (AP-CY) ....... 293,400 ....... 293,400 ....... 293,400 ....... ............... ....... ............... ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, COMBAT AIRCRAFT ....... 3,417,702 ....... 3,244,402 ....... 3,417,702 ....... ............... ....... +173,300 OTHER AIRLIFT 5 C-130J ....... 68,373 1 123,373 ....... 68,373 ....... ............... -1 -55,000 6 C-130J ADVANCE PROCUREMENT (CY) ....... ............... ....... ............... 18 180,000 +18 +$180,000 +18 +180,000 7 HC-130J 1 152,212 3 278,212 1 152,212 ....... ............... -2 -126,000 9 MC-130J 4 374,866 6 500,866 4 374,866 ....... ............... -2 -126,000 12 JOINT CARGO AIRCRAFT ....... ............... ....... 115,000 ....... 137,863 ....... +137,863 ....... +22,863 ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, OTHER AIRLIFT ....... 595,451 ....... 1,017,451 ....... 913,314 ....... +317,863 ....... -104,137 OTHER AIRCRAFT 15 HH-60 LOSS REPLACEMENT/RECAP ....... 60,596 ....... 60,596 ....... 57,396 ....... -3,200 ....... -3,200 17 V-22 OSPREY 4 294,220 4 294,220 4 294,220 ....... ............... ....... ............... 18 V-22 OSPREY (AP-CY) ....... 15,000 ....... 15,000 ....... 15,000 ....... ............... ....... ............... MISSION SUPPORT AIRCRAFT 19 CIVIL AIR PATROL A/C 5 2,498 5 9,298 5 9,298 ....... +6,800 ....... ............... OTHER AIRCRAFT 24 TARGET DRONES 15 129,866 15 129,866 15 129,866 ....... ............... ....... ............... 26 RQ-4 UAV ....... 75,000 ....... 182,000 ....... 75,000 ....... ............... ....... -107,000 28 AC-130J 2 163,970 2 163,970 2 163,970 ....... ............... ....... ............... 30 MQ-9 24 553,530 36 708,530 24 527,430 ....... -26,100 -12 -181,100 31 RQ-4 BLOCK 40 PROC ....... 11,654 ....... 11,654 ....... 11,654 ....... ............... ....... ............... ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, OTHER AIRCRAFT ....... 1,306,334 ....... 1,575,134 ....... 1,283,834 ....... -22,500 ....... -291,300 MODIFICATION OF INSERVICE AIRCRAFT STRATEGIC AIRCRAFT 32 B-2A ....... 82,296 ....... 82,296 ....... 82,296 ....... ............... ....... ............... 33 B-1B ....... 149,756 ....... 149,756 ....... 149,756 ....... ............... ....... ............... 34 B-52 ....... 9,781 ....... 9,781 ....... 9,781 ....... ............... ....... ............... 35 LARGE AIRCRAFT INFRARED COUNTERMEASURES ....... 28,800 ....... 28,800 ....... 28,800 ....... ............... ....... ............... TACTICAL AIRCRAFT 36 A-10 ....... 89,919 ....... 89,919 ....... 251,119 ....... +161,200 ....... +161,200 37 F-15 ....... 148,378 ....... 148,378 ....... 210,878 ....... +62,500 ....... +62,500 38 F-16 ....... 6,896 ....... 6,896 ....... 6,896 ....... ............... ....... ............... 39 F-22A ....... 283,871 ....... 333,871 ....... 288,271 ....... +4,400 ....... -45,600 40 F-35 MODIFICATIONS ....... 147,995 ....... 30,195 ....... 147,995 ....... ............... ....... +117,800 AIRLIFT AIRCRAFT 41 C-5 ....... 6,967 ....... 6,967 ....... 6,967 ....... ............... ....... ............... 43 C-5M ....... 944,819 ....... 870,819 ....... 879,819 ....... -65,000 ....... +9,000 44 C-5M (AP-CY) ....... 175,800 ....... 175,800 ....... 175,800 ....... ............... ....... ............... 46 C-17A ....... 205,079 ....... 205,079 ....... 205,079 ....... ............... ....... ............... 47 C-21 ....... 199 ....... 199 ....... 199 ....... ............... ....... ............... 48 C-32A ....... 1,750 ....... 1,750 ....... 1,750 ....... ............... ....... ............... 49 C-37A ....... 445 ....... 445 ....... 445 ....... ............... ....... ............... 50 C-130 AMP ....... ............... ....... 10,000 ....... ............... ....... ............... ....... -10,000 TRAINER AIRCRAFT 51 GLIDER MODS ....... 126 ....... 126 ....... 126 ....... ............... ....... ............... 52 T6 ....... 15,494 ....... 15,494 ....... 15,494 ....... ............... ....... ............... 53 T-1 ....... 272 ....... 272 ....... 272 ....... ............... ....... ............... 54 T-38 ....... 20,455 ....... 20,455 ....... 20,455 ....... ............... ....... ............... OTHER AIRCRAFT 56 U-2 MODS ....... 44,477 ....... 44,477 ....... 44,477 ....... ............... ....... ............... 57 KC-10A (ATCA) ....... 46,921 ....... 46,921 ....... 8,000 ....... -38,921 ....... -38,921 58 C-12 ....... 1,876 ....... 1,876 ....... 1,876 ....... ............... ....... ............... 59 MC-12W ....... 17,054 ....... 17,054 ....... 17,054 ....... ............... ....... ............... 60 C-20 MODS ....... 243 ....... 243 ....... 243 ....... ............... ....... ............... 61 VC-25A MOD ....... 11,185 ....... 11,185 ....... 11,185 ....... ............... ....... ............... 62 C-40 ....... 243 ....... 243 ....... 243 ....... ............... ....... ............... 63 C-130 ....... 67,853 ....... 67,853 ....... 67,853 ....... ............... ....... ............... 65 C130J MODS ....... 70,555 ....... 70,555 ....... 70,555 ....... ............... ....... ............... 66 C-135 ....... 46,707 ....... 62,707 ....... 46,707 ....... ............... ....... -16,000 67 COMPASS CALL MODS ....... 50,024 ....... 50,024 ....... 50,024 ....... ............... ....... ............... 68 RC-135 ....... 165,237 ....... 165,237 ....... 165,237 ....... ............... ....... ............... 69 E-3 ....... 193,099 ....... 193,099 ....... 169,599 ....... -23,500 ....... -23,500 70 E-4 ....... 47,616 ....... 47,616 ....... 47,616 ....... ............... ....... ............... 71 E-8 ....... 59,320 ....... 49,020 ....... 59,320 ....... ............... ....... +10,300 72 H-1 ....... 5,449 ....... 5,449 ....... 5,449 ....... ............... ....... ............... 73 H-60 ....... 26,227 ....... 26,227 ....... 26,227 ....... ............... ....... ............... 74 RQ-4 UAV MODS ....... 9,257 ....... 9,257 ....... 7,757 ....... -1,500 ....... -1,500 75 HC/MC-130 MODIFICATIONS ....... 22,326 ....... 22,326 ....... 22,326 ....... ............... ....... ............... 76 OTHER AIRCRAFT ....... 18,832 ....... 18,832 ....... 18,832 ....... ............... ....... ............... 77 MQ-1 MODS ....... 30,861 ....... 30,861 ....... 30,861 ....... ............... ....... ............... 78 MQ-9 MODS ....... 238,360 ....... 210,960 ....... 217,360 ....... -21,000 ....... +6,400 79 MQ-9 PAYLOAD--UAS ....... 93,461 ....... 93,461 ....... 93,461 ....... ............... ....... ............... 80 CV-22 MODS ....... 23,881 ....... 23,881 ....... 23,881 ....... ............... ....... ............... ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, MODIFICATION OF INSERVICE AIRCRAFT ....... 3,610,162 ....... 3,456,662 ....... 3,688,341 ....... +78,179 ....... +231,679 AIRCRAFT SPARES AND REPAIR PARTS 81 INITIAL SPARES/REPAIR PARTS ....... 729,691 ....... 679,691 ....... 736,269 ....... +6,578 ....... +56,578 ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, AIRCRAFT SPARES AND REPAIR PARTS ....... 729,691 ....... 679,691 ....... 736,269 ....... +6,578 ....... +56,578 AIRCRAFT SUPPORT EQUIPMENT AND FACILITIES COMMON SUPPORT EQUIPMENT 82 AIRCRAFT REPLACEMENT SUPPORT EQUIP ....... 56,542 ....... 56,542 ....... 56,542 ....... ............... ....... ............... POST PRODUCTION SUPPORT 83 A-10 ....... 5,100 ....... 5,100 ....... 5,100 ....... ............... ....... ............... 84 B-1 ....... 965 ....... 965 ....... 965 ....... ............... ....... ............... 86 B-2A ....... 47,580 ....... 47,580 ....... 47,580 ....... ............... ....... ............... 88 KC-10A (ATCA) ....... 13,100 ....... 13,100 ....... 13,100 ....... ............... ....... ............... 89 C-17A ....... 181,703 ....... 181,703 ....... 181,703 ....... ............... ....... ............... 90 C-130 ....... 31,830 ....... 31,830 ....... 31,830 ....... ............... ....... ............... 91 C-135 ....... 13,434 ....... 13,434 ....... 13,434 ....... ............... ....... ............... 92 F-15 POST PRODUCTION SUPPORT ....... 2,363 ....... 2,363 ....... 2,363 ....... ............... ....... ............... 93 F-16 POST PRODUCTION SUPPORT ....... 8,506 ....... 5,906 ....... 5,360 ....... -3,146 ....... -546 96 OTHER AIRCRAFT ....... 9,522 ....... 22 ....... 9,522 ....... ............... ....... +9,500 INDUSTRIAL PREPAREDNESS 97 INDUSTRIAL PREPAREDNESS ....... 20,731 ....... 20,731 ....... 20,731 ....... ............... ....... ............... WAR CONSUMABLES 98 WAR CONSUMABLES ....... 89,727 ....... 89,727 ....... ............... ....... -89,727 ....... -89,727 OTHER PRODUCTION CHARGES 100 OTHER PRODUCTION CHARGES ....... 842,392 ....... 842,392 ....... 812,792 ....... -29,600 ....... -29,600 ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, AIRCRAFT SUPPORT EQUIPMENT AND FACILITIES. ....... 1,323,495 ....... 1,311,395 ....... 1,201,022 ....... -122,473 ....... -110,373 AERIAL DISPERSAL UNITS (HOUSE) ....... ............... ....... 16,000 ....... ............... ....... ............... ....... -16,000 CLASSIFIED PROGRAMS ....... 20,164 ....... 20,164 ....... 20,164 ....... ............... ....... ............... ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, AIRCRAFT PROCUREMENT, AIR FORCE ....... 11,002,999 ....... 11,320,899 ....... 11,260,646 ....... +257,647 ....... -60,253 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ COMMITTEE RECOMMENDED ADJUSTMENTS The following table details the adjustments recommended by the Committee: [In thousands of dollars] ---------------------------------------------------------------------------------------------------------------- Change from Line Item 2013 budget Committee budget estimate recommendation estimate ---------------------------------------------------------------------------------------------------------------- 6 C-130J (AP) .............. 180,000 +180,000 Unfunded requirement for advance procurement for 18 .............. .............. +180,000 C/HC/MC/AC-130Js 12 C-27J .............. 137,863 +137,863 Retain C-27J force structure .............. .............. +137,863 15 HH-60 Loss Replacement/RECAP 60,596 57,396 -3,200 Interim contractor support--forward financing .............. .............. -3,200 19 Civil Air Patrol A/C 2,498 9,298 +6,800 Program increase .............. .............. +6,800 30 MQ-9 553,530 527,430 -26,100 Block 50 GCS--program adjustment .............. .............. -26,100 36 A-10 89,919 251,119 +161,200 Retain A-10 force structure .............. .............. +161,200 37 F-15 148,378 210,878 +62,500 AESA radars for ANG F-15s--level production rates .............. .............. +62,500 39 F-22A 283,871 288,271 +4,400 Engine modifications--excessive cost growth .............. .............. -17,100 Backup oxygen system .............. .............. +21,500 43 C-5M 1,057,019 992,019 -65,000 ECO--execution delays and excessive growth .............. .............. -50,000 Inflation adjustment .............. .............. -15,000 57 KC-10A [ATCA] 46,921 8,000 -38,921 CNS/ATM--funds requested early to need .............. .............. -38,921 69 E-3 193,099 169,599 -23,500 Block 40/45--reduce one shipset .............. .............. -17,300 NGIFF--excessive unit cost growth .............. .............. -6,200 74 RQ-4 Mods 9,257 7,757 -1,500 Lack of requirement .............. .............. -1,500 78 MQ-9 Mods 238,360 217,360 -21,000 GCS Block 50--unsustained ramp .............. .............. -21,000 81 Initial Spares/Repair Parts 729,691 736,269 +6,578 C-27 spares--retain force structure .............. .............. +51,978 CV-22 spares--unexecutable growth .............. .............. -45,400 93 F-16 8,506 5,360 -3,146 Production line shutdown--excess to need .............. .............. -3,146 98 War Consumables 89,727 .............. -89,727 Transfer to Title IX .............. .............. -89,727 99 Other Production Charges 842,392 812,792 -29,600 ---------------------------------------------------------------------------------------------------------------- F-22 Automatic Backup Oxygen System [ABOS].--The fiscal year 2013 budget request includes no funds for the F-22 ABOS. The Committee notes that following submission of the fiscal year 2013 budget request, the Air Force was directed by the Secretary of Defense to take additional measures to ensure the health and safety of the airmen and maintainers operating the F-22, to include expediting the installation of an automatic backup oxygen system. The Committee understands that the fiscal year 2013 funding requirement for the procurement of ABOS is $21,500,000 and that the Air Force intends to defer other, previously funded critical reliability improvements to the F-22 in order to accelerate the procurement and installation of ABOS. The Committee does not agree with this strategy and recommends an additional $21,500,000 in fiscal year 2013 to execute the accelerated ABOS schedule without negatively impacting other reliability projects. C-130J Advance Procurement.--The fiscal year 2013 budget request includes no Advance Procurement funding in Aircraft Procurement, Air Force, for C-130J aircraft that will be procured in fiscal year 2014. As previously stated in Senate Report 112-77, the Committee is concerned that the lack of advance procurement funding will cause a negative production impact that will result in delays of future aircraft deliveries. The Committee notes that the Marine Corps has included Advance Procurement funding in the fiscal year 2013 budget request for C-130Js planned for procurement by the Marine Corps in fiscal year 2014. The Committee recommends $180,000,000 in Aircraft Procurement, Air Force for Advance Procurement of no less than 18 C-130Js to be procured by the Air Force in fiscal year 2014. U-2 Sensors.--The Committee notes that funds appropriated in prior years for U-2 sensors and sensor upgrades have not been obligated due to pending force structure decisions. The Committee sees no reason to delay the procurement of U-2 sensors and upgrades and directs the Air Force to obligate fiscal year 2011 and fiscal year 2012 funds for the U-2 for the purpose for which they were appropriated. Operational Support Aircraft.--Senate Report 112-77 to accompany Public Law 112-74, the Department of Defense Appropriations Act for Fiscal Year 2012, expressed support for the Air Force 2010 Air Mobility Master Plan which called for replacement of C-20B aircraft with C-37Bs. To ensure an orderly transition for enactment of this plan, the Committee directs the Secretary of the Air Force to submit a detailed plan with the fiscal year 2014 budget submission that provides both schedule and budget data for acquisition of the C-37Bs. Spare Engines.--The Committee understands that the Air Force has a shortfall of spare engines for F-15E and F-16 aircraft. The Committee encourages the Air Force to fully fund this requirement. Missile Procurement, Air Force Appropriations, 2012.................................... $6,080,877,000 Budget estimate, 2013................................... 5,491,846,000 House allowance......................................... 5,449,146,000 Committee recommendation................................ 4,913,276,000 The Committee recommends an appropriation of $4,913,276,000. This is $578,570,000 below the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [Dollars in thousands] ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Change from Change from Line Item Qty. 2013 budget Qty. House allowance Qty. Committee --------------------------------------------------- estimate recommendation Qty. Budget estimate Qty. House allowance ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ MISSILE PROCUREMENT, AIR FORCE BALLISTIC MISSILES MISSILE REPLACEMENT EQUIPMENT--BALLISTIC 1 MISSILE REPLACEMENT EQ--BALLISTIC ....... $56,906 ....... $56,906 ....... $56,906 ....... ............... ....... ............... OTHER MISSILES TACTICAL 2 JASSM 157 240,399 157 240,399 157 240,399 ....... ............... ....... ............... 3 SIDEWINDER (AIM-9X) 164 88,020 164 88,020 164 81,550 ....... -$6,470 ....... -$6,470 4 AMRAAM 113 229,637 113 206,937 113 201,637 ....... -28,000 ....... -5,300 5 PREDATOR HELLFIRE MISSILE 413 47,675 413 47,675 413 47,675 ....... ............... ....... ............... 6 SMALL DIAMETER BOMB 144 42,000 144 42,000 ....... 2,000 -144 -40,000 -144 -40,000 INDUSTRIAL FACILITIES 7 INDUSTRIAL PREPAREDNESS/POLLUTION PREVENTION ....... 744 ....... 744 ....... 744 ....... ............... ....... ............... ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, OTHER MISSILES ....... 648,475 ....... 625,775 ....... 574,005 ....... -74,470 ....... -51,770 MODIFICATION OF INSERVICE MISSILES CLASS IV 9 MM III MODIFICATIONS ....... 54,794 ....... 54,794 ....... 54,794 ....... ............... ....... ............... 10 AGM-65D MAVERICK ....... 271 ....... 271 ....... 271 ....... ............... ....... ............... 11 AGM-88A HARM ....... 23,240 ....... 23,240 ....... 23,240 ....... ............... ....... ............... 12 AIR LAUNCH CRUISE MISSILE ....... 13,620 ....... 13,620 ....... 13,620 ....... ............... ....... ............... 13 SMALL DIAMETER BOMB ....... 5,000 ....... 5,000 ....... 5,000 ....... ............... ....... ............... ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, MODIFICATION OF INSERVICE MISSILES ....... 96,925 ....... 96,925 ....... 96,925 ....... ............... ....... SPARES AND REPAIR PARTS 14 INITIAL SPARES/REPAIR PARTS ....... 74,373 ....... 74,373 ....... 74,373 ....... ............... ....... ............... OTHER SUPPORT SPACE PROGRAMS 15 ADVANCED EHF ....... 557,205 ....... 547,205 ....... 463,205 ....... -94,000 ....... -84,000 17 WIDEBAND GAPFILLER SATELLITES ....... 36,835 ....... 36,835 ....... 36,835 ....... ............... ....... ............... 19 GPS III SPACE SEGMENT 2 410,294 2 410,294 2 410,294 ....... ............... ....... ............... 20 GPS III SPACE SEGMENT (AP-CY) ....... 82,616 ....... 82,616 ....... 82,616 ....... ............... ....... ............... 21 SPACEBORNE EQUIP (COMSEC) ....... 10,554 ....... 10,554 ....... 10,554 ....... ............... ....... ............... 22 GLOBAL POSITIONING (SPACE) ....... 58,147 ....... 48,147 ....... 58,147 ....... ............... ....... +10,000 23 DEF METEOROLOGICAL SAT PROG (SPACE) ....... 89,022 ....... 89,022 ....... 89,022 ....... ............... ....... ............... 24 EVOLVED EXPENDABLE LAUNCH VEH (SPACE) 4 1,679,856 4 1,679,856 4 805,250 ....... -874,606 ....... -874,606 EVOLVED EXPENDABLE LAUNCH VEH INFRASTRUCTURE (SPACE) ....... ............... ....... ............... ....... 654,606 ....... +654,606 ....... +654,606 25 SBIR HIGH (SPACE) 2 454,251 2 454,251 2 378,651 ....... -75,600 ....... -75,600 SPECIAL PROGRAMS 30 SPECIAL UPDATE PROGRAMS ....... 138,904 ....... 138,904 ....... 138,904 ....... ............... ....... ............... ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, OTHER SUPPORT ....... 3,517,684 ....... 3,497,684 ....... 3,128,084 ....... -389,600 ....... -369,600 CLASSIFIED PROGRAMS ....... 1,097,483 ....... 1,097,483 ....... 982,983 ....... -114,500 ....... -114,500 ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, MISSILE PROCUREMENT, AIR FORCE ....... 5,491,846 ....... 5,449,146 ....... 4,913,276 ....... -578,570 ....... -535,870 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ COMMITTEE RECOMMENDED ADJUSTMENTS The following table details the adjustments recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ 2013 budget Committee Change from Line Item estimate recommendation budget request ------------------------------------------------------------------------ 3 Sidewinder (AIM- 88,020 81,550 -6,470 9X) All Up Round .............. .............. -4,530 Missile Cost Growth Captive Air .............. .............. -1,940 Training Missile Cost Growth 4 AMRAAM 229,637 201,637 -28,000 All Up Round .............. .............. -17,000 Missile Cost Growth Captive Air .............. .............. -11,000 Training Missile Cost Growth 6 Small Diameter 42,000 2,000 -40,000 Bomb Delay .............. .............. -40,000 Procurement by One Year 15 Advanced EHF 557,205 463,205 -94,000 Schedule .............. .............. -94,000 Delay Due to Late AP Award 24 Evolved 1,679,856 805,250 -874,606 Expendable Launch Vehicle (Space) Transfer .............. .............. -874,606 EELV Launch Capability to line 24a 24a Evolved .............. 654,606 +654,606 Expendable Launch Vehicle Infrastructure (Space) Transfer .............. .............. +874,606 EELV Launch Capability from line 24 EELV Launch .............. .............. -220,000 Capability Contract Savings 25 SBIR High 454,251 378,651 -75,600 (Space) Schedule .............. .............. -75,600 Delay Due to Late AP Award 999 Classified 1,097,483 982,983 -114,500 Programs Classified .............. .............. -114,500 Adjustment ------------------------------------------------------------------------ Small Diameter Bomb Increment II [SDB II].--The Committee recommends no procurement funds for SDB II in fiscal year 2013. The request to start production in fiscal year 2013 is premature due to significant testing that remains to be completed and delays in the Joint Strike Fighter [JSF] development program. The SDB II program began its test phase in spring 2012 and is scheduled to conduct 11 free-flight tests prior to obtaining production approval. These tests are not scheduled to complete until the end of fiscal year 2013. Furthermore, SDB II must be integrated on both the F-15E and F-35B/C Joint Strike Fighter aircraft before it is able to enter full rate production. SDB II integration on the JSF is not scheduled to begin until fiscal year 2017, with operational testing scheduled to complete in 2020. According to the Air Force, the current acquisition strategy will require eight lots of low rate initial production to accommodate F-35B/C schedule delays, which will result in higher unit costs for an extended period of time. The Committee remains supportive of the capability of this weapon, and fully funds the research and development of this program in fiscal year 2013. The Committee recommends the Department of the Air Force modify its acquisition strategy to align with F-15E and JSF integration and consider an optimal production rate that minimizes individual unit costs. Advanced Extremely High Frequency [AEHF] and Space Based Infrared System [SBIRS].--Beginning in fiscal year 2012, Congress directed incremental funding for the AEHF and SBIRS programs. In an effort to gain efficiencies from a combined buy of certain long-lead materials, the Air Force has delayed the contract awards for AEHF 5 and 6 and SBIRS GEO 5 and 6 until late in fiscal year 2012. The Committee commends the Air Force for its flexibility and ingenuity in looking across its acquisition portfolio to find efficiencies. However, due to the delay in contract awards, and the incremental funding strategy for both programs, funds that were expected to be expended in fiscal year 2012 will carry over into fiscal year 2013. The recommendation includes a reduction of $94,000,000 in AEHF procurement and $75,600,000 in SBIRS procurement due to the contract delays and the carryover of prior-year funds. Evolved Expendable Launch Vehicle.--The budget request includes $1,679,856,000 for the Evolved Expendable Launch Vehicle [EELV] program. The EELV program consists of EELV Launch Services, which funds the launch of Air Force satellites, and EELV Launch Capability, which maintains the engineering workforce and infrastructure needed for launch missions. In fiscal year 2012, the Air Force successfully negotiated substantial cost savings to the EELV Launch Capability contract. Savings from those negotiations are planned to be used to procure an additional Delta IV launch service. The Committee commends the Air Force and the contractor for identifying more than $219,000,000 in efficiencies in the current fiscal year and reinvesting the savings in a launch vehicle that was not included in the fiscal year 2012 budget request. However, because the fiscal year 2013 budget could not anticipate the savings coming out of these negotiations, the funds requested in the fiscal year 2013 budget are in excess of what will be required to sustain the EELV Launch Capability program. Therefore, the Committee recommends a reduction of $220,000,000 to the EELV Launch Capability program due to negotiated contract savings. The recommendation fully supports the request for four EELV Launch Services. In addition, the Committee recommends the separation of EELV Launch Services and EELV Launch Capability funds into separate procurement line items in order to increase the budget visibility of each program. The Committee directs the Secretary of the Air Force to provide for separate procurement line items for each program in future budget submissions. Procurement of Ammunition, Air Force Appropriations, 2012.................................... $499,185,000 Budget estimate, 2013................................... 599,194,000 House allowance......................................... 599,194,000 Committee recommendation................................ 593,194,000 The Committee recommends an appropriation of $593,194,000. This is $6,000,000 below the budget estimate. committee recommended program The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [Dollars in thousands] ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Change from Change from Line Item Qty. 2013 budget Qty. House allowance Qty. Committee --------------------------------------------------- estimate recommendation Qty. Budget estimate Qty. House allowance ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ PROCUREMENT OF AMMUNITION, AIR FORCE PROCUREMENT OF AMMO, AIR FORCE 1 ROCKETS ....... $8,927 ....... $8,927 ....... $8,927 ....... ............... ....... ............... 2 CARTRIDGES ....... 118,075 ....... 118,075 ....... 118,075 ....... ............... ....... ............... BOMBS 3 PRACTICE BOMBS ....... 32,393 ....... 32,393 ....... 31,893 ....... -$500 ....... -$500 4 GENERAL PURPOSE BOMBS ....... 163,467 ....... 163,467 ....... 163,467 ....... ............... ....... ............... 5 JOINT DIRECT ATTACK MUNITION 3,259 101,921 3,259 101,921 3,259 101,921 ....... ............... ....... ............... FLARE, IR MJU-7B 6 CAD/PAD ....... 43,829 ....... 43,829 ....... 43,829 ....... ............... ....... ............... 7 EXPLOSIVE ORDINANCE DISPOSAL [EOD] ....... 7,515 ....... 7,515 ....... 7,515 ....... ............... ....... ............... 8 SPARES AND REPAIR PARTS ....... 1,003 ....... 1,003 ....... 1,003 ....... ............... ....... ............... 9 MODIFICATIONS ....... 5,321 ....... 5,321 ....... 5,321 ....... ............... ....... ............... 10 ITEMS LESS THAN $5,000,000 ....... 5,066 ....... 5,066 ....... 5,066 ....... ............... ....... ............... FUZES 11 FLARES ....... 46,010 ....... 46,010 ....... 46,010 ....... ............... ....... ............... 12 FUZES ....... 36,444 ....... 36,444 ....... 36,444 ....... ............... ....... ............... ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, PROCUREMENT OF AMMO, AIR FORCE ....... 569,971 ....... 569,971 ....... 569,471 ....... -500 ....... -500 WEAPONS 13 SMALL ARMS ....... 29,223 ....... 29,223 ....... 23,723 ....... -5,500 ....... -5,500 ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, PROCUREMENT OF AMMUNITION, AIR FORCE ....... 599,194 ....... 599,194 ....... 593,194 ....... -6,000 ....... -6,000 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ COMMITTEE RECOMMENDED ADJUSTMENTS The following table details the adjustments recommended by the Committee: [In thousands of dollars] ---------------------------------------------------------------------------------------------------------------- 2013 budget Committee Change from Line Item estimate recommendation budget request ---------------------------------------------------------------------------------------------------------------- 3 Practice Bombs 32,393 31,893 -500 Pricing adjustment--MK-84 Inert ............... ............... -500 13 Small Arms 29,223 23,723 -5,500 Pricing adjustment ............... ............... -5,500 ---------------------------------------------------------------------------------------------------------------- Other Procurement, Air Force Appropriations, 2012.................................... $17,403,564,000 Budget estimate, 2013................................... 16,720,848,000 House allowance......................................... 16,632,575,000 Committee recommendation................................ 17,008,348,000 The Committee recommends an appropriation of $17,008,348,000. This is $287,500,000 above the budget estimate. committee recommended program The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [Dollars in thousands] ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Change from Change from Line Item Qty. 2013 budget Qty. House allowance Qty. Committee --------------------------------------------------- estimate recommendation Qty. Budget estimate Qty. House allowance ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ OTHER PROCUREMENT, AIR FORCE VEHICULAR EQUIPMENT PASSENGER CARRYING VEHICLES 1 PASSENGER CARRYING VEHICLE ....... $1,905 ....... $1,905 ....... $1,905 ....... ............... ....... ............... CARGO + UTILITY VEHICLES 2 FAMILY MEDIUM TACTICAL VEHICLE ....... 18,547 ....... 18,547 ....... 18,547 ....... ............... ....... ............... 3 CAP VEHICLES ....... 932 ....... 932 ....... 932 ....... ............... ....... ............... 4 ITEMS LESS THAN $5M (CARGO) ....... 1,699 ....... 1,699 ....... 1,699 ....... ............... ....... ............... SPECIAL PURPOSE VEHICLES 5 SECURITY AND TACTICAL VEHICLES ....... 10,850 ....... 10,850 ....... 10,850 ....... ............... ....... ............... 6 ITEMS LESS THAN $5M (SPECIAL) ....... 9,246 ....... 9,246 ....... 9,246 ....... ............... ....... ............... FIRE FIGHTING EQUIPMENT 7 FIRE FIGHTING/CRASH RESCUE VEHICLES ....... 23,148 ....... 23,148 ....... 23,148 ....... ............... ....... ............... MATERIALS HANDLING EQUIPMENT 8 ITEMS LESS THAT $5,000,000 ....... 18,323 ....... 18,323 ....... 18,323 ....... ............... ....... ............... BASE MAINTENANCE SUPPORT 9 RUNWAY SNOW REMOVAL & CLEANING EQUIP ....... 1,685 ....... 1,685 ....... 1,685 ....... ............... ....... ............... 10 ITEMS LESS THAN $5M ....... 17,014 ....... 17,014 ....... 17,014 ....... ............... ....... ............... ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, VEHICULAR EQUIPMENT ....... 103,349 ....... 103,349 ....... 103,349 ....... ............... ....... ELECTRONICS AND TELECOMMUNICATIONS EQUIP COMM SECURITY EQUIPMENT [COMSEC] 12 COMSEC EQUIPMENT ....... 166,559 ....... 128,259 ....... 166,559 ....... ............... ....... +$38,300 13 MODIFICATIONS (COMSEC) ....... 1,133 ....... 1,133 ....... 1,133 ....... ............... ....... ............... INTELLIGENCE PROGRAMS 14 INTELLIGENCE TRAINING EQUIPMENT ....... 2,749 ....... 2,749 ....... 2,749 ....... ............... ....... ............... 15 INTELLIGENCE COMM EQUIP ....... 32,876 ....... 32,876 ....... 32,876 ....... ............... ....... ............... 16 ADVANCE TECH SENSORS ....... 877 ....... 877 ....... 877 ....... ............... ....... ............... 17 MISSION PLANNING SYSTEMS ....... 15,295 ....... 15,295 ....... 15,295 ....... ............... ....... ............... ELECTRONICS PROGRAMS 18 TRAFFIC CONTROL/LANDING ....... 21,984 ....... 21,984 ....... 21,984 ....... ............... ....... ............... 19 NATIONAL AIRSPACE SYSTEM ....... 30,698 ....... 30,698 ....... 30,698 ....... ............... ....... ............... 20 BATTLE CONTROL SYSTEM--FIXED ....... 17,368 ....... 17,368 ....... 17,368 ....... ............... ....... ............... 21 THEATER AIR CONTROL SYS IMPRO ....... 23,483 ....... 23,483 ....... 23,483 ....... ............... ....... ............... 22 WEATHER OBSERVATION FORECAST ....... 17,864 ....... 17,864 ....... 17,864 ....... ............... ....... ............... 23 STRATEGIC COMMAND AND CONTROL ....... 53,995 ....... 28,995 ....... 34,995 ....... -$19,000 ....... +6,000 24 CHEYENNE MOUNTAIN COMPLEX ....... 14,578 ....... 14,578 ....... 14,578 ....... ............... ....... ............... 25 TAC SIGNIT SPT ....... 208 ....... 208 ....... 208 ....... ............... ....... ............... SPECIAL COMM--ELECTRONICS PROJECTS 27 GENERAL INFORMATION TECHNOLOGY ....... 69,743 ....... 69,743 ....... 69,743 ....... ............... ....... ............... 28 AF GLOBAL COMMAND & CONTROL SYSTEM ....... 15,829 ....... 15,829 ....... 15,829 ....... ............... ....... ............... 29 MOBILITY COMMAND AND CONTROL ....... 11,023 ....... 11,023 ....... 11,023 ....... ............... ....... ............... 30 AIR FORCE PHYSICAL SECURITY SYSTEM ....... 64,521 ....... 64,521 ....... 64,521 ....... ............... ....... ............... 31 COMBAT TRAINING RANGES ....... 18,217 ....... 18,217 ....... 33,217 ....... +15,000 ....... +15,000 32 C3 COUNTERMEASURES ....... 11,899 ....... 11,899 ....... 11,899 ....... ............... ....... ............... 33 GCSS-AF FOS ....... 13,920 ....... 13,920 ....... 13,920 ....... ............... ....... ............... 34 THEATER BATTLE MGT C2 SYS ....... 9,365 ....... 9,365 ....... 9,365 ....... ............... ....... ............... 35 AIR OPERATIONS CENTER [AOC] ....... 33,907 ....... 33,907 ....... 33,907 ....... ............... ....... ............... AIR FORCE COMMUNICATIONS 36 INFORMATION TRANSPORT SYSTEMS ....... 52,464 ....... 52,464 ....... 52,464 ....... ............... ....... ............... 38 AFNET ....... 125,788 ....... 125,788 ....... 125,788 ....... ............... ....... ............... 39 VOICE SYSTEMS ....... 16,811 ....... 16,811 ....... 16,811 ....... ............... ....... ............... 40 USCENTCOM ....... 32,138 ....... 32,138 ....... 32,138 ....... ............... ....... ............... DISA PROGRAMS 41 SPACE BASED IR SENSOR PROG SPACE ....... 47,135 ....... 47,135 ....... 47,135 ....... ............... ....... ............... 42 NAVSTAR GPS SPACE ....... 2,031 ....... 2,031 ....... 2,031 ....... ............... ....... ............... 43 NUDET DETECTION SYS [NDS] SPACE ....... 5,564 ....... 5,564 ....... 5,564 ....... ............... ....... ............... 44 AF SATELLITE CONTROL NETWORK SPACE ....... 44,219 ....... 44,219 ....... 44,219 ....... ............... ....... ............... 45 SPACELIFT RANGE SYSTEM SPACE ....... 109,545 ....... 109,545 ....... 109,545 ....... ............... ....... ............... 46 MILSATCOM SPACE ....... 47,592 ....... 47,592 ....... 47,592 ....... ............... ....... ............... 47 SPACE MODS SPACE ....... 47,121 ....... 47,121 ....... 47,121 ....... ............... ....... ............... 48 COUNTERSPACE SYSTEM ....... 20,961 ....... 20,961 ....... 20,961 ....... ............... ....... ............... ORGANIZATION AND BASE 49 TACTICAL C-E EQUIPMENT ....... 126,131 ....... 126,131 ....... 126,131 ....... ............... ....... ............... 50 COMBAT SURVIVOR EVADER LOCATER ....... 23,707 ....... 23,707 ....... 23,707 ....... ............... ....... ............... 51 RADIO EQUIPMENT ....... 12,757 ....... 12,757 ....... 12,757 ....... ............... ....... ............... 52 CCTV/AUDIOVISUAL EQUIPMENT ....... 10,716 ....... 10,716 ....... 10,716 ....... ............... ....... ............... 53 BASE COMM INFRASTRUCTURE ....... 74,528 ....... 74,528 ....... 74,528 ....... ............... ....... ............... MODIFICATIONS 54 COMM ELECT MODS ....... 43,507 ....... 43,507 ....... 43,507 ....... ............... ....... ............... ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, ELECTRONICS AND TELECOMMUNICATIONS EQUIP ....... 1,490,806 ....... 1,427,506 ....... 1,486,806 ....... -4,000 ....... +59,300 OTHER BASE MAINTENANCE AND SUPPORT EQUIP PERSONAL SAFETY AND RESCUE EQUIP 55 NIGHT VISION GOGGLES ....... 22,693 ....... 22,693 ....... 22,693 ....... ............... ....... ............... 56 ITEMS LESS THAN $5,000,000 (SAFETY) ....... 30,887 ....... 30,887 ....... 30,887 ....... ............... ....... ............... DEPOT PLANT + MATERIALS HANDLING EQ 57 MECHANIZED MATERIAL HANDLING ....... 2,850 ....... 2,850 ....... 2,850 ....... ............... ....... ............... BASE SUPPORT EQUIPMENT 58 BASE PROCURED EQUIPMENT ....... 8,387 ....... 8,387 ....... 8,387 ....... ............... ....... ............... 59 CONTINGENCY OPERATIONS ....... 10,358 ....... 10,358 ....... 10,358 ....... ............... ....... ............... 60 PRODUCTIVITY CAPITAL INVESTMENT ....... 3,473 ....... 3,473 ....... 3,473 ....... ............... ....... ............... 62 MOBILITY EQUIPMENT ....... 14,471 ....... 14,471 ....... 14,471 ....... ............... ....... ............... 63 ITEMS LESS THAN $5M (BASE SUPPORT) ....... 1,894 ....... 1,894 ....... 1,894 ....... ............... ....... ............... SPECIAL SUPPORT PROJECTS 65 DARP RC135 ....... 24,176 ....... 24,176 ....... 24,176 ....... ............... ....... ............... 66 DISTRIBUTED GROUND SYSTEMS ....... 142,928 ....... 142,928 ....... 142,928 ....... ............... ....... ............... 68 SPECIAL UPDATE PROGRAM ....... 479,446 ....... 479,446 ....... 479,446 ....... ............... ....... ............... 69 DEFENSE SPACE RECONNAISSANCE PROGRAM ....... 39,155 ....... 39,155 ....... 39,155 ....... ............... ....... ............... ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, OTHER BASE MAINTENANCE AND SUPPORT EQUIP ....... 780,718 ....... 780,718 ....... 780,718 ....... ............... ....... SPARE AND REPAIR PARTS 71 SPARES AND REPAIR PARTS ....... 14,663 ....... 14,663 ....... 14,663 ....... ............... ....... ............... CLASSIFIED PROGRAMS ....... 14,331,312 ....... 14,306,339 ....... 14,622,812 ....... +291,500 ....... +316,473 ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, OTHER PROCUREMENT, AIR FORCE ....... 16,720,848 ....... 16,632,575 ....... 17,008,348 ....... +287,500 ....... +375,773 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ COMMITTEE RECOMMENDED ADJUSTMENTS The following table details the adjustments recommended by the Committee: [In thousands of dollars] ---------------------------------------------------------------------------------------------------------------- 2013 budget Committee Change from Line Item estimate recommendation budget estimate ---------------------------------------------------------------------------------------------------------------- 23 Strategic Command And Control 53,995 34,995 -19,000 Early to need ............... ............... -19,000 31 Combat Training Ranges 18,217 33,217 +15,000 Test and Training Range Upgrades ............... ............... +15,000 Classified Programs 14,331,312 14,622,812 +291,500 Classified adjustment ............... ............... +291,500 ---------------------------------------------------------------------------------------------------------------- Procurement, Defense-Wide Appropriations, 2012.................................... $4,893,428,000 Budget estimate, 2013................................... 4,187,935,000 House allowance......................................... 4,429,335,000 Committee recommendation................................ 4,692,685,000 The Committee recommends an appropriation of $4,692,685,000. This is $504,750,000 above the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [Dollars in thousands] ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Change from Change from Line Item Qty. 2013 budget Qty. House allowance Qty. Committee --------------------------------------------------- estimate recommendation Qty. Budget estimate Qty. House allowance ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ PROCUREMENT, DEFENSE-WIDE MAJOR EQUIPMENT MAJOR EQUIPMENT, DCAA 2 MAJOR EQUIPMENT ITEMS LESS THAN $5M ....... $1,486 ....... $1,486 ....... $1,486 ....... ............... ....... ............... MAJOR EQUIPMENT, DCMA 3 MAJOR EQUIPMENT ....... 2,129 ....... 2,129 ....... 2,129 ....... ............... ....... ............... MAJOR EQUIPMENT, DHRA 5 PERSONNEL ADMINISTRATION ....... 6,147 ....... 6,147 ....... 6,147 ....... ............... ....... ............... MAJOR EQUIPMENT, DISA 12 INFORMATION SYSTEMS SECURITY ....... 12,708 ....... 12,708 ....... 12,708 ....... ............... ....... ............... 14 GLOBAL COMBAT SUPPORT SYSTEM ....... 3,002 ....... 3,002 ....... 3,002 ....... ............... ....... ............... 15 TELEPORT PROGRAM ....... 46,992 ....... 46,992 ....... 46,992 ....... ............... ....... ............... 16 ITEMS LESS THAN $5M ....... 108,462 ....... 108,462 ....... 108,462 ....... ............... ....... ............... 17 NET CENTRIC ENTERPRISE SERVICES [NCES] ....... 2,865 ....... 2,865 ....... 2,865 ....... ............... ....... ............... 18 DEFENSE INFORMATION SYSTEMS NETWORK ....... 116,906 ....... 116,906 ....... 116,906 ....... ............... ....... ............... 19 PUBLIC KEY INFRASTRUCTURE ....... 1,827 ....... 1,827 ....... 1,827 ....... ............... ....... ............... 21 CYBER SECURITY INITIATIVE ....... 10,319 ....... 10,319 ....... 10,319 ....... ............... ....... ............... MAJOR EQUIPMENT, DLA 22 MAJOR EQUIPMENT ....... 9,575 ....... 9,575 ....... 6,775 ....... -$2,800 ....... -$2,800 MAJOR EQUIPMENT, DMACT 23 A-WEAPON SYSTEM COST 6 15,179 6 15,179 6 15,179 ....... ............... ....... ............... MAJOR EQUIPMENT, DODEA 24 AUTOMATION/EDUCATIONAL SUPPORT & LOGISTICS ....... 1,458 ....... 1,458 ....... 1,458 ....... ............... ....... ............... 26 EQUIPMENT ....... 2,522 ....... 2,522 ....... 2,522 ....... ............... ....... ............... MAJOR EQUIPMENT, DEFENSE THREAT REDUCTION AGENCY 27 VEHICLES 1 50 1 50 1 50 ....... ............... ....... ............... 28 OTHER MAJOR EQUIPMENT 3 13,096 3 13,096 3 12,433 ....... -663 ....... -663 MAJOR EQUIPMENT, MDA 30 THAAD SYSTEM 36 460,728 36 460,728 36 460,728 ....... ............... ....... ............... 31 AEGIS BMD 29 389,626 29 389,626 46 578,626 +17 +189,000 +17 +189,000 32 BMDS AN/TPY-2 RADARS 1 217,244 1 217,244 2 380,244 +1 +163,000 +1 +163,000 33 RADAR SYSTEMS ....... 10,177 ....... 10,177 ....... 10,177 ....... ............... ....... ............... 33 IRON DOME SYSTEM ....... ............... ....... ............... ....... 211,000 ....... +211,000 ....... +211,000 MAJOR EQUIPMENT, NSA 41 INFORMATION SYSTEMS SECURITY PROGRAM [ISSP] ....... 6,770 ....... 6,770 ....... 6,770 ....... ............... ....... ............... MAJOR EQUIPMENT, OSD 42 MAJOR EQUIPMENT, OSD ....... 45,938 ....... 45,938 ....... 45,938 ....... ............... ....... ............... 43 MAJOR EQUIPMENT, INTELLIGENCE ....... 17,582 ....... 17,582 ....... 17,582 ....... ............... ....... ............... MAJOR EQUIPMENT, TJS 44 MAJOR EQUIPMENT, TJS ....... 21,878 ....... 21,878 ....... 21,878 ....... ............... ....... ............... MAJOR EQUIPMENT, WHS 45 MAJOR EQUIPMENT, WHS ....... 26,550 ....... 26,550 ....... 26,550 ....... ............... ....... ............... ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, MAJOR EQUIPMENT ....... 1,551,216 ....... 1,551,216 ....... 2,110,753 ....... +559,537 ....... +559,537 SPECIAL OPERATIONS COMMAND AVIATION PROGRAMS 46 SOF ROTARY WING UPGRADES AND SUSTAINMENT ....... 74,832 ....... 74,832 ....... 74,832 ....... ............... ....... ............... 48 MH-60 SOF MODERNIZATION PROGRAM ....... 126,780 ....... 126,780 ....... 126,780 ....... ............... ....... ............... 49 NON-STANDARD AVIATION 7 99,776 7 37,000 7 37,000 ....... -62,776 ....... ............... 51 SOF U-28 ....... 7,530 ....... 167,906 ....... 70,306 ....... +62,776 ....... -97,600 52 MH-47 CHINOOK 7 134,785 7 134,785 7 134,785 ....... ............... ....... ............... 53 RQ-11 UNMANNED AERIAL VEHICLE ....... 2,062 ....... 2,062 ....... 2,062 ....... ............... ....... ............... 54 CV-22 SOF MODIFICATION 4 139,147 4 139,147 4 139,147 ....... ............... ....... ............... 55 MQ-1 UNMANNED AERIAL VEHICLE ....... 3,963 ....... 26,963 ....... 3,963 ....... ............... ....... -23,000 56 MQ-9 UNMANNED AERIAL VEHICLE ....... 3,952 ....... 39,352 ....... 3,952 ....... ............... ....... -35,400 58 STUASL0 ....... 12,945 ....... 12,945 ....... ............... ....... -12,945 ....... -12,945 59 PRECISION STRIKE PACKAGE ....... 73,013 ....... 73,013 ....... 73,013 ....... ............... ....... ............... 60 AC-130J ....... 51,484 ....... 51,484 ....... 32,806 ....... -18,678 ....... -18,678 62 C-130 MODIFICATIONS ....... 25,248 ....... 25,248 ....... 25,248 ....... ............... ....... ............... 64 AIRCRAFT SUPPORT ....... 5,314 ....... 5,314 ....... 5,314 ....... ............... ....... ............... SHIPBUILDING 64 UNDERWATER SYSTEMS ....... 23,037 ....... 23,037 ....... 6,449 ....... -16,588 ....... -16,588 AMMUNITION PROGRAMS 66 SOF ORDNANCE REPLENISHMENT ....... 113,183 ....... 113,183 ....... 113,183 ....... ............... ....... ............... 67 SOF ORDNANCE ACQUISITION ....... 36,981 ....... 36,981 ....... 36,981 ....... ............... ....... ............... OTHER PROCUREMENT PROGRAMS 68 COMM EQUIPMENT & ELECTRONICS ....... 99,838 ....... 145,738 ....... 99,838 ....... ............... ....... -45,900 69 SOF INTELLIGENCE SYSTEMS ....... 71,428 ....... 71,428 ....... 71,428 ....... ............... ....... ............... 70 SMALL ARMS & WEAPONS ....... 27,108 ....... 27,108 ....... 27,108 ....... ............... ....... ............... 71 DCGS-SOF ....... 12,767 ....... 15,967 ....... 12,767 ....... ............... ....... -3,200 74 SOF COMBATANT CRAFT SYSTEMS ....... 42,348 ....... 42,348 ....... 42,348 ....... ............... ....... ............... 75 SPARES AND REPAIR PARTS ....... 600 ....... 600 ....... 600 ....... ............... ....... ............... 77 TACTICAL VEHICLES ....... 37,421 ....... 37,421 ....... 37,421 ....... ............... ....... ............... 78 MISSION TRAINING AND PREPARATIONS SYSTEMS ....... 36,949 ....... 41,949 ....... 38,273 ....... +1,324 ....... -3,676 79 COMBAT MISSION REQUIREMENTS ....... 20,255 ....... 20,255 ....... 20,255 ....... ............... ....... ............... 80 MILCON COLLATERAL EQUIPMENT ....... 17,590 ....... 17,590 ....... 17,590 ....... ............... ....... ............... 82 SOF AUTOMATION SYSTEMS ....... 66,573 ....... 66,573 ....... 66,573 ....... ............... ....... ............... 83 SOF GLOBAL VIDEO SURVEILLANCE ACTIVITIES ....... 6,549 ....... 6,549 ....... 6,549 ....... ............... ....... ............... 84 SOF OPERATIONAL ENHANCEMENTS INTELLIGENCE ....... 32,335 ....... 32,335 ....... 32,335 ....... ............... ....... ............... 85 SOF SOLDIER PROTECTION AND SURVIVAL SYSTEMS ....... 15,153 ....... 15,153 ....... 15,153 ....... ............... ....... ............... 86 SOF VISUAL AUGMENTATION, LASERS AND SENSOR SY ....... 33,920 ....... 33,920 ....... 33,920 ....... ............... ....... ............... 87 SOF TACTICAL RADIO SYSTEMS ....... 75,132 ....... 75,132 ....... 75,132 ....... ............... ....... ............... 90 MISCELLANEOUS EQUIPMENT ....... 6,667 ....... 6,667 ....... 6,667 ....... ............... ....... ............... 91 SOF OPERATIONAL ENHANCEMENTS ....... 217,972 ....... 243,272 ....... 217,972 ....... ............... ....... -25,300 92 MILITARY INFORMATION SUPPORT OPERATIONS ....... 27,417 ....... 27,417 ....... 27,417 ....... ............... ....... ............... ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, SPECIAL OPERATIONS COMMAND ....... 1,782,054 ....... 2,017,454 ....... 1,735,167 ....... -46,887 ....... -282,287 CHEMICAL/BIOLOGICAL DEFENSE 93 INSTALLATION FORCE PROTECTION ....... 24,025 ....... 24,025 ....... 24,025 ....... ............... ....... ............... 94 INDIVIDUAL PROTECTION ....... 73,720 ....... 73,720 ....... 73,720 ....... ............... ....... ............... 95 DECONTAMINATION ....... 506 ....... 506 ....... 506 ....... ............... ....... ............... 96 JOINT BIOLOGICAL DEFENSE PROGRAM ....... 32,597 ....... 32,597 ....... 32,597 ....... ............... ....... ............... 97 COLLECTIVE PROTECTION ....... 3,144 ....... 3,144 ....... 3,144 ....... ............... ....... ............... 98 CONTAMINATION AVOIDANCE ....... 164,886 ....... 164,886 ....... 164,886 ....... ............... ....... ............... ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, CHEMICAL/BIOLOGICAL DEFENSE ....... 298,878 ....... 298,878 ....... 298,878 ....... ............... ....... CLASSIFIED PROGRAMS ....... 555,787 ....... 561,787 ....... 547,887 ....... -7,900 ....... -13,900 ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, PROCUREMENT, DEFENSE-WIDE ....... 4,187,935 ....... 4,429,335 ....... 4,692,685 ....... +504,750 ....... +263,350 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ COMMITTEE RECOMMENDED ADJUSTMENTS The following table details the adjustments recommended by the Committee: [In thousands of dollars] ---------------------------------------------------------------------------------------------------------------- 2013 budget Committee Change from Line Item estimate recommendation budget estimate ---------------------------------------------------------------------------------------------------------------- 22 Major Equipment 9,575 6,775 -2,800 Virtual Interactive Processing System--change in ............... ............... -2,800 acquisition strategy 28 Other Major Equipment 13,096 12,433 -663 Early to need emergent technologies line ............... ............... -663 31 Aegis BMD 389,626 578,626 +189,000 17 additional SM-3 IB interceptors ............... ............... +189,000 32 BMDS AN/TPY-2 Radars 217,244 380,244 +163,000 Additional AN/TPY-2 radar ............... ............... +163,000 34 Iron Dome ............... 211,000 +211,000 Program increase--authorization adjustment ............... ............... +211,000 49 Non-Standard Aviation 99,776 37,000 -62,776 SOCOM requested transfer to Procurement Defense- ............... ............... -62,776 Wide Line 51 51 U-28 7,530 70,306 +62,776 SOCOM requested transfer from Procurement Defense- ............... ............... +62,776 Wide Line 49 58 STUASL0 12,945 ............... -12,945 Early to need--production delay ............... ............... -12,945 60 AC/MC-130J 51,484 32,806 -18,678 Excess to need due to testing schedule delays ............... ............... -18,678 64 Underwater Systems 23,037 6,449 -16,588 Excess to need due to reviews slipping and program ............... ............... -8,588 rebaselining in development SOCOM requested transfer to RDT&E Defense-Wide ............... ............... -8,000 Line 272 78 Mission Training and Preparation Systems 36,949 38,273 +1,324 SOCOM requested transfer from RDT&E Defense-Wide ............... ............... +1,324 Line 262 Classified Programs 555,787 547,887 -7,900 Classified adjustment ............... ............... -7,900 ---------------------------------------------------------------------------------------------------------------- Special Operations Command [SOCOM].--The fiscal year 2013 request includes $99,776,000 for nonstandard aviation aircraft and $7,530,000 for U-28 aircraft. SOCOM is consolidating and combining these efforts and in doing so requested to transfer $62,776,000 from nonstandard aviation to U-28 aircraft. This consolidation is necessary to meet current and future SOCOM demands and maximize combat capability. In order to execute this efficiency, the Committee also recommends using appropriated funds to complete the modifications necessary to convert four nonstandard aircraft into U-28 aircraft configuration. Special Operations Command [SOCOM].--Following the submission of the fiscal year 2013 budget request, SOCOM submitted an urgent request for a high definition full motion video payload for existing weapons systems. To support this important initiative, the Committee recommends a $142,400,000 increase over the budget request. To ensure SOCOM has the capacity to properly receive and analyze the data, within 120 days after enactment, the Committee directs the Commander of U.S. Special Operations Command to submit a report outlining SOCOM's plan to support the bandwidth demands and manpower necessary. MISSILE DEFENSE AGENCY Standard Missile-3 Block IB [SM-3 IB].--The fiscal year 2013 budget request includes $389,626,000 for the procurement of 29 SM-3 IB interceptors, a reduction of 33 interceptors from previous plans. The Committee is aware of this program's past developmental challenges which warranted a slow-down of the production ramp. However, the Committee is further aware that the SM-3 IB recently concluded two successful intercept tests and appears headed toward a production decision pending success of the next flight intercept planned for the first quarter of fiscal year 2013. The Committee is further aware of Combatant Commanders' continued high demand for the SM-3 interceptor and therefore recommends an increase of $189,000,000 for 17 additional Block 1B interceptors. AN/TPY-2 Radar.--The fiscal year 2013 budget request includes $217,244,000 for the procurement of one AN/TPY-2 radar, a reduction of one radar from the prior year. The Committee notes the high operational demands for the AN/TPY-2 radar, to include a recent deployment directed by the Chairman of the Joint Chiefs of Staff. The Committee is aware of potential emerging requirements for this radar and recommends an additional $163,000,000 only for the procurement of a second AN/TPY-2 radar in fiscal year 2013. The Committee notes that the total fiscal year 2013 recommendation of $380,244,000 is equal to amounts appropriated in fiscal year 2012 allowing for the purchase of two radars. Defense Production Act Purchases Appropriations, 2012.................................... $169,964,000 Budget estimate, 2013................................... 89,189,000 House allowance......................................... 63,531,000 Committee recommendation................................ 189,189,000 The Committee recommends an appropriation of $189,189,000. This is $100,000,000 above the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [Dollars in thousands] ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Change from Change from Line Item Qty. 2013 budget Qty. House allowance Qty. Committee --------------------------------------------------- estimate recommendation Qty. Budget estimate Qty. House allowance ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ DEFENSE PRODUCTION ACT PURCHASES 1 DEFENSE PRODUCTION ACT PURCHASES ....... $89,189 ....... $63,531 ....... $189,189 ....... +$100,000 ....... +$125,658 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Additional Funding.--The Committee recognizes the critical role that the DPA title III program serves in strengthening the U.S. defense industrial base and believes that this work is in the national interest. Therefore, the Committee increases funding for DPA by $100,000,000 over the budget request. The Committee directs that the additional funding be competitively awarded to new initiatives and priority consideration should be given to completion of DPA projects initiated in prior years. Furthermore, the Committee directs the Under Secretary of Defense for Acquisition, Technology, and Logistics to inform the congressional defense committees 30 days prior to any obligation or expenditure of these funds. TITLE IV RESEARCH, DEVELOPMENT, TEST AND EVALUATION Funds appropriated under this title provide the resources required to conduct a program of research, development, test and evaluation, including research in basic science, applied research, advanced technology development, demonstration and validation, engineering and manufacturing development, and operational systems development. The President's fiscal year 2013 budget requests a total of $69,407,767,000 for research, development, test and evaluation appropriations. SUMMARY OF COMMITTEE ACTION The Committee recommends research, development, test and evaluation appropriations totaling $69,091,078,000 for fiscal year 2013. This is $316,689,000 below the budget estimate. Committee recommended research, development, test and evaluation appropriations for fiscal year 2013 are summarized below: SUMMARY OF RESEARCH, DEVELOPMENT, TEST AND EVALUATION APPROPRIATIONS [In thousands of dollars] ---------------------------------------------------------------------------------------------------------------- Change from Account 2013 budget Committee budget estimate recommendation estimate ---------------------------------------------------------------------------------------------------------------- Research, Development, Test and Evaluation:..................... Research, Development, Test and Evaluation, Army............ 8,929,415 8,427,588 -501,827 Research, Development, Test and Evaluation, Navy............ 16,882,877 16,646,307 -236,570 Research, Development, Test and Evaluation, Air Force....... 25,428,046 25,374,286 -53,760 Research, Development, Test and Evaluation, Defense-Wide.... 17,982,161 18,419,129 +436,968 Operational Test and Evaluation, Defense.................... 185,268 223,768 +38,500 ----------------------------------------------- Total..................................................... 69,407,767 69,091,078 -316,689 ---------------------------------------------------------------------------------------------------------------- COMMITTEE RECOMMENDATIONS The Committee has displayed recommended adjustments in tables presented under each appropriation account. These adjustments reflect the following Committee actions: elimination of funds requested for programs which are lower priority, duplicative, or not supported by firm requirements in out-year development or procurement appropriations; deletion of excess funds based on program delays or slow execution; addition of funds to reflect congressional priorities and to rectify shortfalls in the budget estimate; and implementation of recommendations in S. 3254, the National Defense Authorization Act for Fiscal Year 2013, as reported. The Committee directs that the funding increases outlined in these tables shall be provided only for the specific purposes indicated in the table. RESEARCH, DEVELOPMENT, TEST AND EVALUATION OVERVIEW Research, Development, Test and Evaluation [RDT&E] Budget Exhibits.--The Committee appreciates the efforts of the Under Secretary of Defense, Comptroller, to standardize the RDT&E budget exhibits. However, the Committee notes the absence of R- 3 exhibits for many programs resulting from the Financial Management Regulation change that now only requires R-3 exhibits for acquisition category 1D programs. The congressional defense committees rely on these justification exhibits regardless of acquisition category level. Therefore, for the fiscal year 2014 budget submission, the Under Secretary of Defense, Comptroller is directed to provide R-3 exhibits for all programs funded in Budget Activities 4, 5, and 7 regardless of acquisition category or funding amount. Joint Strike Fighter [JSF] Modernization.--The fiscal year 2013 Navy and Marine Corps' budget request includes $16,834,000 for modernization, an increase of over $7,000,000 above the fiscal year 2012 enacted amount. The Committee is concerned that the Department plans to begin modernization when the baseline development program is not scheduled to complete until fiscal year 2018. Beginning modernization in fiscal year 2013 creates a 6-year overlap of baseline development and modernization, adding to existing concurrency risk in the program. Prior to beginning the modernization effort, the Committee directs the Secretary of Defense to create a Joint Requirement Oversight Council and warfighter validated joint modernization roadmap, spanning the unclassified and classified programs, that prioritizes the future capability improvements for each aircraft variant. The Committee denies the fiscal year 2013 request of $16,834,000 and expects the program office to utilize fiscal year 2012 funding to create this modernization roadmap. In addition, the Committee recommends the program office budget for modernization efforts in a separate program element in future budget submissions. Joint Strike Fighter [JSF] Configuration Management.--The Committee notes that during the low rate initial production aircraft lots one through five, there is one hardware configuration and five software configurations. Beginning in low rate initial production lot six, the hardware and software configuration differ when compared to earlier lots of aircraft. The Committee is concerned with establishing multiple hardware and software configurations across the fleet, especially because these aircraft deliver to multiple locations worldwide. The Committee recommends the program office establish a hardware and software management strategy to maximize technology insertion without hampering affordability. Army Missile Defense Programs.--The Committee understands that the Army has initiated a business case analysis [BCA] to determine the costs, benefits and risks associated with a potential transfer of certain missile defense activities and elements from the Army to the Missile Defense Agency [MDA]. The Committee understands that the BCA is still in progress and will review it following its submission to the congressional defense committees. The Committee further understands that no assets or activities will be transferred during fiscal years 2012 or 2013, consistent with the fact that no funds have been appropriated in this or prior Department of Defense Appropriations Acts to fund a transfer of Army missile defense program responsibilities to MDA, or to fund the implementation of the Army's Program Executive Officer [PEO] for Missiles and Space serving as the Program Executive for Army missile defense systems within MDA. Foreign Object Debris Detection Systems.--The Committee is concerned that the Department of Defense is not adequately taking advantage of technologies that would reduce foreign object debris-related aircraft engine replacement or repair costs across the services. Accordingly, the Committee encourages the Secretary of Defense to develop a plan to begin the use of high technology debris detection systems to reduce both the hazards and maintenance costs associated with foreign object debris, while improving aviation safety in both ground and air operations. Technology Transfer.--The Committee recognizes the importance of transitioning technology between the Federal Government and non-Federal organizations, academia, the nonprofit sector, and state and local governments. Technology transfer ensures that taxpayer investments in research and development are used to significantly benefit the economy and the general public, along with promoting commercialization for small businesses. Further, in fulfilling its responsibility to ensure the full use of the results of the Nation's Federal investment in research and development, the Committee encourages the Department of Defense to place an increased focus on transferring technologies to these entities. Research, Development, Test and Evaluation, Army Appropriations, 2012.................................... $8,745,492,000 Budget estimate, 2013................................... 8,929,415,000 House allowance......................................... 8,593,055,000 Committee recommendation................................ 8,427,588,000 The Committee recommends an appropriation of $8,427,588,000. This is $501,827,000 below the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [In thousands of dollars] -------------------------------------------------------------------------------------------------------------------------------------------------------- Change from 2013 budget House Committee ------------------------------- Item estimate allowance recommendation Budget House estimate allowance -------------------------------------------------------------------------------------------------------------------------------------------------------- RESEARCH, DEVELOPMENT, TEST & EVAL, ARMY BASIC RESEARCH IN-HOUSE LABORATORY INDEPENDENT RESEARCH 20,860 20,860 20,860 .............. .............. DEFENSE RESEARCH SCIENCES 219,180 219,180 219,180 .............. .............. UNIVERSITY RESEARCH INITIATIVES 80,986 80,986 80,986 .............. .............. UNIVERSITY AND INDUSTRY RESEARCH CENTERS 123,045 107,446 123,045 .............. +15,599 --------------------------------------------------------------------------------- TOTAL, BASIC RESEARCH 444,071 428,472 444,071 .............. +15,599 APPLIED RESEARCH MATERIALS TECHNOLOGY 29,041 39,041 69,041 +40,000 +30,000 SENSORS AND ELECTRONIC SURVIVABILITY 45,260 45,260 45,260 .............. .............. TRACTOR HIP 22,439 22,439 22,439 .............. .............. AVIATION TECHNOLOGY 51,607 51,607 51,607 .............. .............. ELECTRONIC WARFARE TECHNOLOGY 15,068 15,068 15,068 .............. .............. MISSILE TECHNOLOGY 49,383 49,383 49,383 .............. .............. ADVANCED WEAPONS TECHNOLOGY 25,999 25,999 25,999 .............. .............. ADVANCED CONCEPTS AND SIMULATION 23,507 23,507 23,507 .............. .............. COMBAT VEHICLE AND AUTOMOTIVE TECHNOLOGY 69,062 69,062 69,062 .............. .............. BALLISTICS TECHNOLOGY 60,823 60,823 60,823 .............. .............. CHEMICAL, SMOKE AND EQUIPMENT DEFEATING TECHNOLOGY 4,465 4,465 4,465 .............. .............. JOINT SERVICE SMALL ARMS PROGRAM 7,169 7,169 7,169 .............. .............. WEAPONS AND MUNITIONS TECHNOLOGY 35,218 50,218 35,218 .............. -15,000 ELECTRONICS AND ELECTRONIC DEVICES 60,300 80,300 60,300 .............. -20,000 NIGHT VISION TECHNOLOGY 53,244 53,244 53,244 .............. .............. COUNTERMINE SYSTEMS 18,850 18,850 33,850 +15,000 +15,000 HUMAN FACTORS ENGINEERING TECHNOLOGY 19,872 19,872 19,872 .............. .............. ENVIRONMENTAL QUALITY TECHNOLOGY 20,095 20,095 20,095 .............. .............. COMMAND, CONTROL, COMMUNICATIONS TECHNOLOGY 28,852 28,852 28,852 .............. .............. COMPUTER AND SOFTWARE TECHNOLOGY 9,830 9,830 9,830 .............. .............. MILITARY ENGINEERING TECHNOLOGY 70,693 70,693 77,693 +7,000 +7,000 MANPOWER/PERSONNEL/TRAINING TECHNOLOGY 17,781 17,781 17,781 .............. .............. WARFIGHTER TECHNOLOGY 28,281 28,281 58,281 +30,000 +30,000 MEDICAL TECHNOLOGY 107,891 107,891 107,891 .............. .............. --------------------------------------------------------------------------------- TOTAL, APPLIED RESEARCH 874,730 919,730 966,730 +92,000 +47,000 ADVANCED TECHNOLOGY DEVELOPMENT WARFIGHTER ADVANCED TECHNOLOGY 39,359 39,359 39,359 .............. .............. MEDICAL ADVANCED TECHNOLOGY 69,580 100,580 77,580 +8,000 -23,000 AVIATION ADVANCED TECHNOLOGY 64,215 64,215 76,015 +11,800 +11,800 WEAPONS AND MUNITIONS ADVANCED TECHNOLOGY 67,613 77,613 67,613 .............. -10,000 COMBAT VEHICLE AND AUTOMOTIVE ADVANCED TECHNOLOGY 104,359 104,359 144,359 +40,000 +40,000 COMMAND, CONTROL, COMMUNICATIONS ADVANCED TECHNOLOGY 4,157 4,157 4,157 .............. .............. MANPOWER, PERSONNEL AND TRAINING ADVANCED TECHNOLOGY 9,856 9,856 9,856 .............. .............. ELECTRONIC WARFARE ADVANCED TECHNOLOGY 50,661 50,661 50,661 .............. .............. TRACTOR HIKE 9,126 9,126 9,126 .............. .............. NEXT GENERATION TRAINING & SIMULATION SYSTEMS 17,257 17,257 17,257 .............. .............. TRACTOR ROSE 9,925 9,925 9,925 .............. .............. MILITARY HIV RESEARCH 6,984 22,984 6,984 .............. -16,000 COMBATING TERRORISM, TECHNOLOGY DEVELOPMENT 9,716 9,716 9,716 .............. .............. TRACTOR NAIL 3,487 3,487 3,487 .............. .............. TRACTOR EGGS 2,323 2,323 2,323 .............. .............. ELECTRONIC WARFARE TECHNOLOGY 21,683 21,683 21,683 .............. .............. MISSILE AND ROCKET ADVANCED TECHNOLOGY 71,111 71,111 90,111 +19,000 +19,000 TRACTOR CAGE 10,902 10,902 10,902 .............. .............. HIGH PERFORMANCE COMPUTING MODERNIZATION PROGRAM 180,582 180,582 228,182 +47,600 +47,600 LANDMINE WARFARE AND BARRIER ADVANCED TECHNOLOGY 27,204 27,204 27,204 .............. .............. JOINT SERVICE SMALL ARMS PROGRAM 6,095 6,095 6,095 .............. .............. NIGHT VISION ADVANCED TECHNOLOGY 37,217 37,217 37,217 .............. .............. ENVIRONMENTAL QUALITY TECHNOLOGY DEMONSTRATIONS 13,626 13,626 13,626 .............. .............. MILITARY ENGINEERING ADVANCED TECHNOLOGY 28,458 28,458 28,458 .............. .............. ADVANCED TACTICAL COMPUTER SCIENCE & SENSOR TECHNOLOGY 25,226 25,226 25,226 .............. .............. --------------------------------------------------------------------------------- TOTAL, ADVANCED TECHNOLOGY DEVELOPMENT 890,722 947,722 1,017,122 +126,400 +69,400 DEMONSTRATION & VALIDATION ARMY MISSILE DEFENSE SYSTEMS INTEGRATION 14,505 24,505 14,505 .............. -10,000 ARMY MISSILE DEFENSE SYSTEMS INTEGRATION (SPACE) 9,876 9,876 9,876 .............. .............. LANDMINE WARFARE AND BARRIER--ADV DEV 5,054 5,054 5,054 .............. .............. SMOKE, OBSCURANT AND TARGET DEFEATING SYS--ADV DEV 2,725 2,725 2,725 .............. .............. TANK AND MEDIUM CALIBER AMMUNITION 30,560 30,560 30,560 .............. .............. ADVANCED TANK ARMAMENT SYSTEM [ATAS] 14,347 14,347 14,347 .............. .............. SOLDIER SUPPORT AND SURVIVABILITY 10,073 10,073 4,014 -6,059 -6,059 TACTICAL ELECTRONIC SURVEILLANCE SYSTEM--AD 8,660 8,660 8,660 .............. .............. NIGHT VISION SYSTEMS ADVANCED DEVELOPMENT 10,715 10,715 10,715 .............. .............. ENVIRONMENTAL QUALITY TECHNOLOGY 4,631 4,631 4,631 .............. .............. WARFIGHTER INFORMATION NETWORK-TACTICAL 278,018 278,018 171,418 -106,600 -106,600 NATO RESEARCH AND DEVELOPMENT 4,961 4,961 4,961 .............. .............. AVIATION--ADV DEV 8,602 8,602 8,602 .............. .............. LOGISTICS AND ENGINEER EQUIPMENT--ADV DEV 14,605 14,605 14,605 .............. .............. COMBAT SERVICE SUPPORT CONTROL SYSTEM EVALUATION 5,054 5,054 5,054 .............. .............. MEDICAL SYSTEMS--ADV DEV 24,384 24,384 24,384 .............. .............. SOLDIER SYSTEMS--ADVANCED DEVELOPMENT 32,050 32,050 32,050 .............. .............. INTEGRATED BROADCAST SERVICE 96 96 96 .............. .............. TECHNOLOGY MATURATION INITIATIVES 24,868 24,868 2,197 -22,671 -22,671 ANALYSIS OF ALTERNATIVES .............. .............. 10,871 +10,871 +10,871 TRACTOR JUTE 59 59 59 .............. .............. INDIRECT FIRE PROTECTION CAPABILITY INCREMENT 2-INTERC 76,039 76,039 28,829 -47,210 -47,210 INTEGRATED BASE DEFENSE 4,043 4,043 4,043 .............. .............. ENDURANCE UAVS 26,196 26,196 .............. -26,196 -26,196 --------------------------------------------------------------------------------- TOTAL, DEMONSTRATION & VALIDATION 610,121 620,121 412,256 -197,865 -207,865 ENGINEERING & MANUFACTURING DEVELOPMENT AIRCRAFT AVIONICS 78,538 78,538 50,038 -28,500 -28,500 ARMED, DEPLOYABLE OH-58D 90,494 90,494 90,494 .............. .............. ELECTRONIC WARFARE DEVELOPMENT 181,347 181,347 128,247 -53,100 -53,100 MID-TIER NETWORKING VEHICULAR RADIO 12,636 12,636 2,636 -10,000 -10,000 ALL SOURCE ANALYSIS SYSTEM 5,694 5,694 5,694 .............. .............. TRACTOR CAGE 32,095 32,095 5,095 -27,000 -27,000 INFANTRY SUPPORT WEAPONS 96,478 91,478 89,678 -6,800 -1,800 MEDIUM TACTICAL VEHICLES 3,006 3,006 3,006 .............. .............. JAVELIN 5,040 5,040 5,040 .............. .............. FAMILY OF HEAVY TACTICAL VEHICLES 3,077 3,077 3,077 .............. .............. AIR TRAFFIC CONTROL 9,769 9,769 9,769 .............. .............. TACTICAL UNMANNED GROUND VEHICLE 13,141 13,141 .............. -13,141 -13,141 NIGHT VISION SYSTEMS--SDD 32,621 32,621 32,621 .............. .............. COMBAT FEEDING, CLOTHING, AND EQUIPMENT 2,132 2,132 2,132 .............. .............. NON-SYSTEM TRAINING DEVICES--SDD 44,787 44,787 44,787 .............. .............. TERRAIN INFORMATION--SDD 1,008 1,008 1,008 .............. .............. AIR DEFENSE COMMAND, CONTROL AND INTELLIGENCE--SDD 73,333 73,333 48,408 -24,925 -24,925 CONSTRUCTIVE SIMULATION SYSTEMS DEVELOPMENT 28,937 28,937 28,937 .............. .............. AUTOMATIC TEST EQUIPMENT DEVELOPMENT 10,815 10,815 10,815 .............. .............. DISTRIBUTIVE INTERACTIVE SIMULATIONS [DIS]--SDD 13,926 13,926 13,926 .............. .............. COMBINED ARMS TACTICAL TRAINER [CATT] CORE 17,797 17,797 17,797 .............. .............. BRIGADE ANALYSIS, INTEGRATION AND EVALUATION 214,270 214,270 214,270 .............. .............. WEAPONS AND MUNITIONS--SDD 14,581 14,581 14,581 .............. .............. LOGISTICS AND ENGINEER EQUIPMENT--SDD 43,706 43,706 43,706 .............. .............. COMMAND, CONTROL, COMMUNICATIONS SYSTEMS--SDD 20,776 20,776 20,776 .............. .............. MEDICAL MATERIEL/MEDICAL BIOLOGICAL DEFENSE EQUIPMENT 43,395 43,395 43,395 .............. .............. LANDMINE WARFARE/BARRIER--SDD 104,983 104,983 44,483 -60,500 -60,500 ARTILLERY MUNITIONS 4,346 4,346 4,346 .............. .............. ARMY TACTICAL COMMAND & CONTROL HARDWARE & SOFTWARE 77,223 77,223 49,023 -28,200 -28,200 RADAR DEVELOPMENT 3,486 3,486 3,486 .............. .............. GENERAL FUND ENTERPRISE BUSINESS SYSTEM [GFEBS] 9,963 27,163 9,963 .............. -17,200 FIREFINDER 20,517 20,517 20,517 .............. .............. SOLDIER SYSTEMS--WARRIOR DEM/VAL 51,851 51,851 31,851 -20,000 -20,000 ARTILLERY SYSTEMS 167,797 167,797 167,797 .............. .............. PATRIOT/MEADS COMBINED AGGREGATE PROGRAM [CAP] 400,861 .............. 380,861 -20,000 +380,861 NUCLEAR ARMS CONTROL MONITORING SENSOR NETWORK 7,922 7,922 7,922 .............. .............. INFORMATION TECHNOLOGY DEVELOPMENT 51,463 51,463 51,463 .............. .............. ARMY INTEGRATED MILITARY HUMAN RESOURCES SYSTEM [A-IMH] 158,646 158,646 96,546 -62,100 -62,100 JOINT AIR-TO-GROUND MISSILE [JAGM] 10,000 10,000 10,000 .............. .............. PAC-2/MSE MISSILE 69,029 69,029 69,029 .............. .............. ARMY INTEGRATED AIR AND MISSILE DEFENSE [AIAMD] 277,374 277,374 277,374 .............. .............. MANNED GROUND VEHICLE 639,874 639,874 639,874 .............. .............. AERIAL COMMON SENSOR 47,426 47,426 118,026 +70,600 +70,600 JOINT LIGHT TACTICAL VEHICLE ENG AND MANUFACTURING 72,295 72,295 66,386 -5,909 -5,909 TROJAN--RH12 4,232 4,232 4,232 .............. .............. ELECTRONIC WARFARE DEVELOPMENT 13,942 13,942 13,942 .............. .............. --------------------------------------------------------------------------------- TOTAL, ENGINEERING & MANUFACTURING DEVELOPMENT 3,286,629 2,897,968 2,997,054 -289,575 +99,086 RDT&E MANAGEMENT SUPPORT THREAT SIMULATOR DEVELOPMENT 18,090 18,090 18,090 .............. .............. TARGET SYSTEMS DEVELOPMENT 14,034 14,034 14,034 .............. .............. MAJOR T&E INVESTMENT 37,394 37,394 50,394 +13,000 +13,000 RAND ARROYO CENTER 21,026 21,026 21,026 .............. .............. ARMY KWAJALEIN ATOLL 176,816 176,816 176,816 .............. .............. CONCEPTS EXPERIMENTATION PROGRAM 27,902 27,902 27,902 .............. .............. ARMY TEST RANGES AND FACILITIES 369,900 369,900 369,900 .............. .............. ARMY TECHNICAL TEST INSTRUMENTATION AND TARGETS 69,183 69,183 69,183 .............. .............. SURVIVABILITY/LETHALITY ANALYSIS 44,753 44,753 44,753 .............. .............. AIRCRAFT CERTIFICATION 5,762 5,762 5,762 .............. .............. METEOROLOGICAL SUPPORT TO RDT&E ACTIVITIES 7,402 7,402 7,402 .............. .............. MATERIEL SYSTEMS ANALYSIS 19,954 19,954 19,954 .............. .............. EXPLOITATION OF FOREIGN ITEMS 5,535 5,535 5,535 .............. .............. SUPPORT OF OPERATIONAL TESTING 67,789 67,789 70,789 +3,000 +3,000 ARMY EVALUATION CENTER 62,765 62,765 62,765 .............. .............. SIMULATION & MODELING FOR ACQ, RQTS, & TNG [SMART] 1,545 1,545 1,545 .............. .............. PROGRAMWIDE ACTIVITIES 83,422 83,422 83,422 .............. .............. TECHNICAL INFORMATION ACTIVITIES 50,820 50,820 50,820 .............. .............. MUNITIONS STANDARDIZATION, EFFECTIVENESS AND SAFETY 46,763 56,763 46,763 .............. -10,000 ENVIRONMENTAL QUALITY TECHNOLOGY MGMT SUPPORT 4,601 4,601 4,601 .............. .............. MANAGEMENT HEADQUARTERS (RESEARCH AND DEVELOPMENT) 18,524 18,524 18,524 .............. .............. --------------------------------------------------------------------------------- TOTAL, RDT&E MANAGEMENT SUPPORT 1,153,980 1,163,980 1,169,980 +16,000 +6,000 OPERATIONAL SYSTEMS DEVELOPMENT MLRS PRODUCT IMPROVEMENT PROGRAM 143,005 143,005 118,005 -25,000 -25,000 PATRIOT PRODUCT IMPROVEMENT 109,978 109,978 39,978 -70,000 -70,000 AEROSTAT JOINT PROJECT OFFICE 190,422 190,422 159,922 -30,500 -30,500 ADV FIELD ARTILLERY TACTICAL DATA SYSTEM 32,556 32,556 32,556 .............. .............. COMBAT VEHICLE IMPROVEMENT PROGRAMS 253,959 253,959 196,859 -57,100 -57,100 MANEUVER CONTROL SYSTEM 68,325 68,325 68,325 .............. .............. AIRCRAFT MODIFICATIONS/PRODUCT IMPROVEMENT PROGRAMS 280,247 226,147 216,047 -64,200 -10,100 AIRCRAFT ENGINE COMPONENT IMPROVEMENT PROGRAM 898 898 898 .............. .............. DIGITIZATION 35,180 35,180 10,180 -25,000 -25,000 1NETWORK INTEGRATED EVALUATION [NIE] .............. .............. 28,200 +28,200 +28,200 MISSILE/AIR DEFENSE PRODUCT IMPROVEMENT PROGRAM 20,733 20,733 20,733 .............. .............. TRACTOR CARD 63,243 63,243 63,243 .............. .............. JOINT TACTICAL GROUND SYSTEM 31,738 31,738 31,738 .............. .............. JOINT HIGH SPEED VESSEL [JHSV] 35 35 35 .............. .............. SECURITY AND INTELLIGENCE ACTIVITIES 7,591 7,591 7,591 .............. .............. INFORMATION SYSTEMS SECURITY PROGRAM 15,961 15,961 15,961 .............. .............. GLOBAL COMBAT SUPPORT SYSTEM 120,927 120,927 120,927 .............. .............. SATCOM GROUND ENVIRONMENT (SPACE) 15,756 15,756 15,756 .............. .............. WWMCCS/GLOBAL COMMAND AND CONTROL SYSTEM 14,443 14,443 14,443 .............. .............. TACTICAL UNMANNED AERIAL VEHICLES 31,303 31,303 28,503 -2,800 -2,800 DISTRIBUTED COMMON GROUND/SURFACE SYSTEMS 40,876 40,876 40,876 .............. .............. MQ-1 SKY WARRIOR A UAV 74,618 74,618 74,618 .............. .............. RQ-11 UAV 4,039 4,039 4,039 .............. .............. RQ-7 UAV 31,158 31,158 31,158 .............. .............. VERTICAL UAS 2,387 2,387 .............. -2,387 -2,387 BIOMETRICS ENABLED INTELLIGENCE 15,248 15,248 15,248 .............. .............. END ITEM INDUSTRIAL PREPAREDNESS ACTIVITIES 59,908 59,908 59,908 .............. .............. --------------------------------------------------------------------------------- TOTAL, OPERATIONAL SYSTEMS DEVELOPMENT 1,664,534 1,610,434 1,415,747 -248,787 -194,687 CLASSIFIED PROGRAMS 4,628 4,628 4,628 .............. .............. --------------------------------------------------------------------------------- TOTAL, RESEARCH, DEVELOPMENT, TEST & EVAL, ARMY 8,929,415 8,593,055 8,427,588 -501,827 -165,467 -------------------------------------------------------------------------------------------------------------------------------------------------------- COMMITTEE RECOMMENDED ADJUSTMENTS The following table details the adjustments recommended by the Committee: [In thousands of dollars] ---------------------------------------------------------------------------------------------------------------- 2013 budget Committee Change from Line Item estimate recommendation budget estimate ---------------------------------------------------------------------------------------------------------------- 5 Materials Technology 29,041 69,041 +40,000 Materials research and technology ............... ............... +15,000 Nanotechnology research ............... ............... +10,000 Silicon carbide research ............... ............... +15,000 20 Countermine Systems 18,850 33,850 +15,000 Unexploded ordnance and landmine detection ............... ............... +15,000 research 25 Military Engineering Technology 70,693 77,693 +7,000 U.S. Army Corps of Engineers research ............... ............... +7,000 27 Warfighter Technology 28,281 58,281 +30,000 Clothing and equipment technology ............... ............... +15,000 Power generation and storage research ............... ............... +15,000 30 Medical Advanced Technology 69,580 77,580 +8,000 Military Burn Research Program ............... ............... +8,000 31 Aviation Advanced Technology 64,215 76,015 +11,800 Transfer from line 72, only for fully funded 2nd ............... ............... +11,800 JMR demonstrator in accordance with Army acquisition strategy 33 Combat Vehicle and Automotive Advanced Technology 104,359 144,359 +40,000 Alternative energy research ............... ............... +40,000 45 Missile and Rocket Advanced Technology 71,111 90,111 +19,000 Restore unjustified reduction ............... ............... +19,000 47 High Performance Computing Modernization Program 180,582 228,182 +47,600 Restore unjustified reduction ............... ............... +47,600 60 Soldier Support and Survivability 10,073 4,014 -6,059 C08: unjustified request ............... ............... -6,059 64 Warfighter Information Network-Tactical--DEM/VAL 278,018 171,418 -106,600 Increment III excessive growth ............... ............... -100,000 Management Services--excessive growth ............... ............... -6,600 72 Technology Maturation Initiatives 24,868 2,197 -22,671 Transfer to line 31 ............... ............... -11,800 Analysis of Alternatives--Transfer to line 72A ............... ............... -10,871 72A Analysis of Alternatives ............... 10,871 +10,871 Analysis of Alternatives--Transfer from line 72 ............... ............... +10,871 75 Indirect Fire Protection Capability Increment 2- 76,039 28,829 -47,210 Intercept [IFPC2] Technology development contract award delays ............... ............... -47,210 78 Endurance UAVs 26,196 ............... -26,196 Fielding delays ............... ............... -5,999 Transfer to Title IX: LEMV military utility ............... ............... -20,197 assessment in theater 79 Aircraft Avionics 78,538 50,038 -28,500 Transfer to Title IX: DVE ONS ............... ............... -28,500 81 Electronic Warfare Development 181,347 128,247 -53,100 CIRCM TD delays ............... ............... -53,100 83 Midtier Networking Vehicular Radio [MNVR] 12,636 2,636 -10,000 Funded via Prior Approval Above Threshold ............... ............... -10,000 Reprogramming Fiscal Year 12-14 85 TRACTOR CAGE 32,095 5,095 -27,000 Lack of requirements ............... ............... -27,000 86 Infantry Support Weapons 96,478 89,678 -6,800 S61--Increment 1b program adjustment ............... ............... -6,800 92 Tactical Unmanned Ground Vehicle [TUGV] 13,141 ............... -13,141 Lack of competitive acquisition strategy ............... ............... -13,141 103 Air Defense Command, Control and Intelligence--Eng 73,333 48,408 -24,925 Dev Interceptor enhancements--program terminated by ............... ............... -24,925 Army 113 Landmine Warfare/Barrier--Eng Dev 104,983 44,483 -60,500 HMDS contract award delays and change to ............... ............... -40,000 acquisition strategy EHP--Army requested adjustment ............... ............... -10,600 RCIS program delays ............... ............... -5,400 AMDS contract award delays ............... ............... -4,500 116 Army Tactical Command & Control Hardware and Software 77,223 49,023 -28,200 C34: Transfer to line 169A for NIE Technology ............... ............... -28,200 Transition 120 Soldier Systems--Warrior Dem/Val 51,851 31,851 -20,000 S75--excessive new hardware and software ............... ............... -20,000 development, integration, and evaluation 122 Patriot/MEADS Combined Aggregate Program [CAP] 400,861 380,861 -20,000 Program adjustment ............... ............... -400,861 Completion of Proof of Concept or termination ............... ............... +348,000 liability required by paragraph 19.5.2 of Memorandum of Understanding if certified by the Secretary of Defense US MEADS National Program Office ............... ............... +52,861 US MEADS National Program Office reduction ............... ............... -20,000 125 Integrated Personnel and Pay System-Army [IPPS-A] 158,646 96,546 -62,100 IPPS-A execution delays and Increment II ............... ............... -62,100 concurrency 131 Aerial Common Sensor 47,426 118,026 +70,600 Transfer from Aircraft Procurement, Army, line 18 ............... ............... +46,900 only to exercise option for two additional EMD aircraft, as requested by Army Program increase--only to fully fund EMD ............... ............... +23,700 132 Joint Light Tactical Vehicle [JLTV] Engineering and 72,295 66,386 -5,909 Manufacturing Development Ph Two-month contract award delay ............... ............... -5,909 137 Major T&E Investment 37,394 50,394 +13,000 Program increase--restore unjustified reduction ............... ............... +13,000 150 Support of Operational Testing 67,789 70,789 +3,000 Program increase--restore unjustified reduction ............... ............... +3,000 159 MLRS Product Improvement Program 143,005 118,005 -25,000 Fire Control System--forward financing ............... ............... -25,000 161 Patriot Product Improvement 109,978 39,978 -70,000 Growth without acquisition strategy ............... ............... -70,000 162 Aerostat Joint Project Office 190,422 159,922 -30,500 COCOM exercise--funds requested early to need ............... ............... -30,500 165 Combat Vehicle Improvement Programs 253,959 196,859 -57,100 DS5: Funds requested prematurely for fiscal year ............... ............... -57,100 2014 contract award 167 Aircraft Modifications/Product Improvement Programs 280,247 216,047 -64,200 Project 504: ITEP ahead of need ............... ............... -64,200 169 Digitization 35,180 10,180 -25,000 Transfer to Other Procurement, Army for Non- ............... ............... -25,000 Developmental Emerging Technologies, as requested by Army 169A Network Integrated Evaluation [NIE] Technology ............... 28,200 +28,200 Transition Transfer from line 116, C34, only for NIE ............... ............... +28,200 Technology transition 182 Tactical Unmanned Aerial Vehicles 31,303 28,503 -2,800 11B: TSP Increment II funding ahead of need ............... ............... -2,800 187 Vertical UAS 2,387 ............... -2,387 Lack of justification ............... ............... -2,387 ---------------------------------------------------------------------------------------------------------------- Joint Multi-Role Program [JMR].--The fiscal year 2013 budget request includes $11,800,000 in the Aviation Advanced Technology line to initiate the development of a Joint Multi- Role [JMR] demonstrator. The Committee notes that the Army's acquisition strategy calls for funding two competitively awarded demonstrators; however, only one demonstrator is fully budgeted for in this line. The Committee understands that the Army intends to transfer the funds required for a second demonstrator to the Aviation Advanced Technology line in the year of execution. The Committee notes that this is an inappropriate and risky method to initiate and fund the Army's next major aviation acquisition program, and recommends funding both demonstrators in the same line by transferring the required fiscal year 2013 funds. Further, the Committee directs that no funds may be obligated or expended for a JMR demonstrator in fiscal year 2013 until the Deputy Assistant Secretary of the Army for Research and Technology certifies in writing to the congressional defense committees that the JMR demonstrator program is fully and appropriately budgeted for in accordance with the Army's acquisition strategy. Combat Vehicle Modernization Affordability.--The fiscal year 2013 budget request includes $893,900,000 in Research, Development, Test and Evaluation, Army, program elements 0603653A, 0605625A, and 0203735A, for the modernization of the Army's combat vehicles, to include Stryker, Bradley, Abrams, the Armored Multi-Purpose Vehicle [AMPV] and the Ground Combat Vehicle [GCV]. This includes $639,900,000, over 70 percent, for the GCV. The Committee notes that programmatic and funding requirements for the remainder of the combat vehicle fleet have not been held stable. For example, the fiscal year 2013 budget request terminates the Stryker Modernization program after 5 years and an investment in excess of $250,000,000. Instead, the Army intends to execute Stryker modernization through Engineering Change Proposals [ECPs]; however, the Committee notes that there is no funding programmed across the Future Years Defense Program [FYDP] for a Stryker ECP. The Committee notes that the Army has programmed more than 80 percent of its combat vehicle modernization budget over the next 5 years for the ground combat vehicle, which will eventually make up roughly 10 percent of the Army's combat vehicle fleet. The Committee is concerned that the Army is not adequately budgeting for modernization efforts for a large portion of the fleet. The Committee understands that the Army is conducting a business case analysis on future improvements of its combat vehicle fleet and directs the Secretary of the Army to provide the findings of this analysis to the congressional defense committees with the fiscal year 2014 budget submission. Warfighter Information Network--Tactical [WIN-T].--The fiscal year 2013 budget request includes $275,232,000 for WIN-T Increment III, an increase of $99,544,000 over amounts appropriated in fiscal year 2012. A proposal made by the Army to accelerate the program following a rebaselining necessitated by a previous Nunn-McCurdy breach was denied by the Congress in fiscal year 2012, and the Army subsequently restructured the program. In addition, the Army is exploring alternate programs at the Network Integration Evaluation [NIE] that could deliver the necessary WIN-T Increment III capabilities to the warfighter at a lower cost. Therefore, the Committee finds it premature to request such a significant budget increase and recommends a reduction of $106,600,000 that includes a corresponding reduction of proposed program office growth. This recommendation continues to fund WIN-T Increment III development at the current level. Analyses of Alternatives [AoA].--The fiscal year 2013 budget request includes $10,871,000 within program element 0604115A for Analyses of Alternatives. As previously stated in Senate Report 112-77, the Committee believes that these funds should be requested in a separate program element. Therefore, consistent with the recommendation contained in House Report 112-284, the Joint Explanatory Statement of the Committee of Conference to accompany Public Law 112-74, the Department of Defense Appropriations Act, 2012, the Committee again recommends transferring these funds to a separate line, and directs the Army to follow this approach in future budget submissions. Further, the Committee directs that none of these funds may be obligated or expended to initiate an Analysis of Alternatives without 30-day prior notification to the congressional defense committees identifying the purpose of the AoA and certifying its full funding. Degraded Visual Environment [DVE].--The fiscal year 2013 budget request includes $28,500,000 for a DVE capability in response to an operational need. The Committee notes that the capability developed in response to the operational need will not be fielded to an operational unit until fiscal year 2015. Therefore, the Committee questions the operational relevance of this development effort to the current war in Afghanistan. However, given the Department's long-standing concern with DVE, the Committee supports the operational need in the near term and recommends $12,300,000 for this effort, the amount identified by the Army as required in fiscal year 2013. In addition, the budget request includes $15,000,000 to initiate a DVE program of record in fiscal year 2013. The Committee notes that the acquisition strategy for the program of record is pre-decisional; however, the Committee believes that this program should be developed and funded as an enduring capability instead of the ad hoc approach that the Department has undertaken to date. Therefore, the Committee recommends full funding for the program of record. Furthermore, the Committee understands that a capability to improve aviation safety and survivability by incorporating rotary wing performance mission planning tools is under consideration for inclusion in the program of record and encourages the Army to examine the benefits of these tools for increased survivability. Modernized Expanded Capacity Vehicle [MECV].--Based on Army identified requirements, Congress provided $20,000,000 in Public Law 112-74, the Department of Defense Appropriations Act, 2012, specifically to continue the MECV program. The Army subsequently terminated the program and requested no funding in the fiscal year 2013 budget. The Committee understands that with funds appropriated in fiscal year 2012, the Army intends to complete the initial phase of the MECV program to assess current light tactical vehicle survivability technologies through vehicle testing and modeling and simulation efforts only. The Committee believes the MECV test program as originally proposed would provide a more complete data set against which to assess the technologies and strongly urges the Army to conduct more extensive testing as originally proposed to the Committee by the Army. The Committee directs the Army to provide the results of this testing in writing to the congressional defense committees within 60 days of its completion. Further, the Committee directs the Director of Operational Test and Evaluation to provide to the congressional defense committees in writing his observations and findings regarding the test parameters and test execution, as well as an assessment of these technologies in comparison to other light tactical vehicle survivability efforts. Joint Land Attack Cruise Missile Defense Elevated Netted Sensor [JLENS].--The fiscal year 2013 budget request includes $30,500,000 for a JLENS Combatant Command Exercise. The Committee notes that the congressional defense committees previously approved an above threshold reprogramming request of $40,350,000 for this purpose at the end of fiscal year 2011. Subsequently, the Army determined that those funds were requested ahead of need for numerous reasons, and is seeking to again reprogram those funds for higher Army priorities. In the fiscal year 2013 budget submission, the Army proposes to cancel its planned procurement of JLENS and to conclude the program of record following completion of the Engineering and Manufacturing Development [EMD] phase in fiscal year 2014. The Committee understands that any Combatant Command Exercise would not occur until after the orderly conclusion of the EMD phase in fiscal year 2014. Further, the Committee understands that many details of this exercise, to include the location, scope and a comprehensive cost estimate have yet to be determined. The Committee notes that no operation and maintenance or military construction funds have been budgeted for a Combatant Command Exercise, which, according to previous estimates, could cost in excess of $250,000,000. Therefore, while the Committee maintains its strong support for Combatant Commanders' unfunded requirements, the Committee concludes that the funds requested in Research, Development, Test and Evaluation, Army for a Combatant Command Exercise in fiscal year 2013 are early to need and recommends no funds for that purpose. Medium Extended Air Defense System [MEADS].--The fiscal year 2013 budget request includes $400,861,000 for MEADS, a tri-national ground-based air and terminal ballistic missile defense program among the United States of America, Germany, and Italy. This request would fund the second and final year of a MEADS Proof of Concept and bring the MEADS development program to a close. Under the Proof of Concept, the program would complete verification and testing of the 360-degree multifunction fire control radar and would verify the ability of the PAC-3 Missile Segment Enhancement [MSE] missile to intercept targets from the lightweight, near-vertical launcher; document the specifications, performance characteristics, and capabilities of all system elements; and would conduct two intercept flight tests. The Committee notes that per the report submitted to Congress by the Under Secretary of Defense for Acquisition, Technology and Logistics in accordance with Section 235 of Public Law 112-81, the National Defense Authorization Act for Fiscal Year 2012, the fiscal year 2013 U.S. contribution to the MEADS Proof of Concept is $348,000,000, and that the balance of the fiscal year 2013 request is for program office activities. As an alternative to completing the Proof of Concept, as requested in the fiscal year 2013 budget submission, the Committee understands that the U.S. could potentially seek to end its involvement in the MEADS program after fiscal year 2012. The Committee has been informed by the Department that should the United States decide to pursue this course of action, it would seek to enter a dispute settlement process with the MEADS partners to avoid having to pay termination liability for unilateral early withdrawal from the MEADS program per paragraph 19.5.2 of the MEADS Memorandum of Understanding [MOU]. The Committee notes that over the course of the past year, numerous attempts by the Department to renegotiate the MOU and to jointly conclude the MEADS program after fiscal year 2012 have been rebuffed by the partners. Further, the Committee has been informed that the partners would consider failure of the United States to contribute its fiscal year 2013 MEADS share as required under the MOU a unilateral withdrawal from the program, which would trigger a termination liability funding requirement. The Committee understands that the U.S. termination liability requirement would likely be equal to, but not greater than, the $348,000,000 required to conclude the Proof of Concept. The Committee notes that the payment of termination liability for terminated programs is standard practice and enables the Government to retain technical data rights and harvest technologies and end-items for future U.S. requirements, including Combatant Command needs. For example, to date, the Department of Defense has paid more than $470,000,000 following termination of the Army's Future Combat Systems [FCS] program, which has enabled the transition of certain technologies developed under FCS to other programs. Similarly, the Secretary of Defense and the Chief of Staff of the Army have identified several technologies that the Department would seek to transition from the MEADS program to other U.S. air and missile defense programs upon conclusion of the Proof of Concept. The Committee has been informed, however, that access to these technologies is dependent on bringing the MEADS program to an orderly close by either completing the Proof of Concept as agreed to or by closing out the program following cessation of activities with the payment of termination liability. Therefore, the Committee recommends sufficient funding to either conclude the MEADS Proof of Concept, as requested by the Department of Defense in the fiscal year 2013 budget submission, or to cover termination liability costs required by paragraph 19.5.2 of the MOU, if the Secretary of Defense certifies to the congressional defense committees that withdrawing from the MEADS MOU is in the national interest of the United States. The Committee directs that none of these funds may be obligated or expended for termination liability until 30 days after the Secretary of Defense notifies the congressional defense committees about the details of any such termination liability requirements. Enhanced Medium Altitude Reconnaissance and Surveillance System [EMARSS].--The fiscal year 2013 budget request includes $47,246,000 in Research, Development, Test and Evaluation, Army to conclude the development of EMARSS during fiscal year 2013. The Committee notes that the Army has adjusted its acquisition strategy and no longer plans to procure the original acquisition objective of 36 aircraft. The Committee has been informed that the Army's revised acquisition strategy is underfunded, and recommends an additional $70,600,000 in Research, Development, Test and Evaluation, Army for EMARSS. The Committee notes that this fully funds the Engineering and Manufacturing Development [EMD] phase, to include exercising the option for two additional aircraft, as requested by the Army. Microtechnology Energy.--The Committee understands that the Department of Defense continues its focus on developing sustainable energy technologies that provide strategic effectiveness and energy security in the areas of energy supply, demand and assured distribution. The Committee believes that continued research into these technologies is necessary to develop a wide range of micro- and nanotechnology-enabled mobile military energy technologies. Therefore, the Committee encourages the Department to continue research related to micro technology energy. Prototype Integration Facility [PIF].--The Army Prototype Integration Facility [PIF] remains a key, award-winning enterprise asset. The Committee notes that since 2002, the PIF has executed in excess of $2,600,000,000 in rapid response, quick reaction, and high-priority weapons system hardware and services support to the warfighter. The PIF does not receive mission or program budget funds and relies on customer funding to execute specific weapon system program requirements. The Committee encourages the Army to continue to support upgrades to the PIF, including an enterprise resource planning system that will increase productivity, reduce overall costs, improve schedules and tracking, enhance cost accountability, and support multiple warfighter rapid response tasks. Soldier-Worn Battery Technology.--The Committee encourages the Department to continue to develop and improve soldier-worn technology that reduces the weight a soldier carries while also integrating force protection equipment and electronics to reduce power consumption in combat situations. Blast-Resistant Fuel Tanks.--The Committee understands that the Army has launched an occupant-centric survivability technology development program aimed at increasing survivability for all major vehicle systems, to include fuel systems. The Committee encourages the Army to develop blast- resistant fuel tank technologies leveraging fully modernized technologies for its combat vehicles modernization and reset. Research, Development, Test and Evaluation, Navy Appropriations, 2012.................................... $17,753,940,000 Budget estimate, 2013................................... 16,882,877,000 House allowance......................................... 16,987,768,000 Committee recommendation................................ 16,646,307,000 The Committee recommends an appropriation of $16,646,307,000. This is $236,570,000 below the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [In thousands of dollars] -------------------------------------------------------------------------------------------------------------------------------------------------------- Change from 2013 budget House Committee ------------------------------- Item estimate allowance recommendation Budget House estimate allowance -------------------------------------------------------------------------------------------------------------------------------------------------------- RESEARCH, DEVELOPMENT, TEST & EVAL, NAVY BASIC RESEARCH UNIVERSITY RESEARCH INITIATIVES 113,690 133,690 113,690 .............. -20,000 IN-HOUSE LABORATORY INDEPENDENT RESEARCH 18,261 18,261 18,261 .............. .............. DEFENSE RESEARCH SCIENCES 473,070 473,070 483,070 +10,000 +10,000 --------------------------------------------------------------------------------- TOTAL, BASIC RESEARCH 605,021 625,021 615,021 +10,000 -10,000 APPLIED RESEARCH POWER PROJECTION APPLIED RESEARCH 89,189 89,189 99,189 +10,000 +10,000 FORCE PROTECTION APPLIED RESEARCH 143,301 143,301 213,301 +70,000 +70,000 MARINE CORPS LANDING FORCE TECHNOLOGY 46,528 46,528 46,528 .............. .............. COMMON PICTURE APPLIED RESEARCH 41,696 41,696 41,696 .............. .............. WARFIGHTER SUSTAINMENT APPLIED RESEARCH 44,127 44,127 44,127 .............. .............. ELECTROMAGNETIC SYSTEMS APPLIED RESEARCH 78,228 78,228 78,228 .............. .............. OCEAN WARFIGHTING ENVIRONMENT APPLIED RESEARCH 49,635 64,635 49,635 .............. -15,000 JOINT NON-LETHAL WEAPONS APPLIED RESEARCH 5,973 5,973 5,973 .............. .............. UNDERSEA WARFARE APPLIED RESEARCH 96,814 96,814 96,814 .............. .............. FUTURE NAVAL CAPABILITIES ADVANCED TECHNOLOGY DEV 162,417 162,417 162,417 .............. .............. MINE AND EXPEDITIONARY WARFARE APPLIED RESEARCH 32,394 32,394 32,394 .............. .............. --------------------------------------------------------------------------------- TOTAL, APPLIED RESEARCH 790,302 805,302 870,302 +80,000 +65,000 ADVANCED TECHNOLOGY DEVELOPMENT POWER PROJECTION ADVANCED TECHNOLOGY 56,543 56,543 56,543 .............. .............. FORCE PROTECTION ADVANCED TECHNOLOGY 18,616 18,616 18,616 .............. .............. ELECTROMAGNETIC SYSTEMS ADVANCED TECHNOLOGY 54,858 54,858 64,858 +10,000 +10,000 MARINE CORPS ADVANCED TECHNOLOGY DEMONSTRATION [ATD] 130,598 130,598 130,598 .............. .............. JOINT NON-LETHAL WEAPONS TECHNOLOGY DEVELOPMENT 11,706 11,706 11,706 .............. .............. FUTURE NAVAL CAPABILITIES ADVANCED TECHNOLOGY DEV 256,382 256,382 293,382 +37,000 +37,000 WARFIGHTER PROTECTION ADVANCED TECHNOLOGY 3,880 42,580 3,880 .............. -38,700 UNDERSEA WARFARE ADVANCED TECHNOLOGY .............. 10,000 .............. .............. -10,000 NAVY WARFIGHTING EXPERIMENTS AND DEMONSTRATIONS 51,819 51,819 51,819 .............. .............. --------------------------------------------------------------------------------- TOTAL, ADVANCED TECHNOLOGY DEVELOPMENT 584,402 633,102 631,402 +47,000 -1,700 DEMONSTRATION & VALIDATION AIR/OCEAN TACTICAL APPLICATIONS 34,085 34,085 34,085 .............. .............. AVIATION SURVIVABILITY 8,783 8,783 8,783 .............. .............. DEPLOYABLE JOINT COMMAND AND CONTROL 3,773 3,773 3,773 .............. .............. AIRCRAFT SYSTEMS 24,512 24,512 24,512 .............. .............. ASW SYSTEMS DEVELOPMENT 8,090 8,090 8,090 .............. .............. TACTICAL AIRBORNE RECONNAISSANCE 5,301 5,301 5,301 .............. .............. ADVANCED COMBAT SYSTEMS TECHNOLOGY 1,506 1,506 1,506 .............. .............. SURFACE AND SHALLOW WATER MINE COUNTERMEASURES 190,622 160,622 188,622 -2,000 +28,000 SURFACE SHIP TORPEDO DEFENSE 93,346 93,346 93,346 .............. .............. CARRIER SYSTEMS DEVELOPMENT 108,871 108,871 108,871 .............. .............. PILOT FISH 101,169 101,169 101,169 .............. .............. RETRACT LARCH 74,312 74,312 74,312 .............. .............. RETRACT JUNIPER 90,730 90,730 90,730 .............. .............. RADIOLOGICAL CONTROL 777 777 777 .............. .............. SURFACE ASW 6,704 2,495 6,704 .............. +4,209 ADVANCED SUBMARINE SYSTEM DEVELOPMENT 555,123 555,123 77,028 -478,095 -478,095 OHIO REPLACEMENT PROGRAM .............. .............. 483,095 +483,095 +483,095 SUBMARINE TACTICAL WARFARE SYSTEMS 9,368 9,368 9,368 .............. .............. SHIP CONCEPT ADVANCED DESIGN 24,609 24,609 24,609 .............. .............. SHIP PRELIMINARY DESIGN & FEASIBILITY STUDIES 13,710 9,810 43,710 +30,000 +33,900 ADVANCED NUCLEAR POWER SYSTEMS 249,748 249,748 249,748 .............. .............. ADVANCED SURFACE MACHINERY SYSTEMS 29,897 29,897 29,897 .............. .............. CHALK EAGLE 509,988 509,988 499,988 -10,000 -10,000 LITTORAL COMBAT SHIP [LCS] 429,420 401,620 416,920 -12,500 +15,300 COMBAT SYSTEM INTEGRATION 56,551 56,551 50,551 -6,000 -6,000 CONVENTIONAL MUNITIONS 7,342 7,342 7,342 .............. .............. MARINE CORPS ASSAULT VEHICLES 95,182 95,182 83,182 -12,000 -12,000 MARINE CORPS GROUND COMBAT/SUPPORT SYSTEM 10,496 10,496 10,496 .............. .............. JOINT SERVICE EXPLOSIVE ORDNANCE DEVELOPMENT 52,331 38,331 52,331 .............. +14,000 COOPERATIVE ENGAGEMENT 56,512 56,512 56,512 .............. .............. OCEAN ENGINEERING TECHNOLOGY DEVELOPMENT 7,029 7,029 7,029 .............. .............. ENVIRONMENTAL PROTECTION 21,080 21,080 21,080 .............. .............. NAVY ENERGY PROGRAM 55,324 95,324 55,324 .............. -40,000 FACILITIES IMPROVEMENT 3,401 3,401 3,401 .............. .............. CHALK CORAL 45,966 45,966 45,966 .............. .............. NAVY LOGISTIC PRODUCTIVITY 3,811 3,811 3,811 .............. .............. RETRACT MAPLE 341,305 341,305 341,305 .............. .............. LINK PLUMERIA 181,220 181,220 181,220 .............. .............. RETRACT ELM 174,014 174,014 162,014 -12,000 -12,000 LINK EVERGREEN 68,654 68,654 68,654 .............. .............. SPECIAL PROCESSES 44,487 44,487 44,487 .............. .............. NATO RESEARCH AND DEVELOPMENT 9,389 9,389 9,389 .............. .............. LAND ATTACK TECHNOLOGY 16,132 16,132 16,132 .............. .............. NONLETHAL WEAPONS 44,994 44,994 44,994 .............. .............. JOINT PRECISION APPROACH AND LANDING SYSTEMS 137,369 137,369 135,454 -1,915 -1,915 TACTICAL AIR DIRECTIONAL INFRARED COUNTERMEASURES 73,934 73,934 73,934 .............. .............. ASE SELF-PROTECTION OPTIMIZATION 711 711 711 .............. .............. JOINT COUNTER RADIO CONTROLLED IED ELECTRONIC WARFARE. 71,300 51,300 51,426 -19,874 +126 PRECISION STRIKE WEAPONS DEVELOPMENT PROGRAM 5,654 5,654 5,654 .............. .............. SPACE & ELECTRONIC WARFARE [SEW] ARCHITECTURE/ENGINE 31,549 31,549 28,949 -2,600 -2,600 OFFENSIVE ANTI-SURFACE WARFARE WEAPON DEVELOPMENT 86,801 86,801 86,801 .............. .............. JOINT LIGHT TACTICAL VEHICLE ENGINEERING/MANUFACTURING 44,500 44,500 38,591 -5,909 -5,909 ASW SYSTEMS DEVELOPMENT--MIP 13,172 13,172 13,172 .............. .............. ELECTRONIC WARFARE DEVELOPMENT--MIP 643 643 643 .............. .............. --------------------------------------------------------------------------------- TOTAL, DEMONSTRATION & VALIDATION 4,335,297 4,275,388 4,285,499 -49,798 +10,111 ENGINEERING & MANUFACTURING DEVELOPMENT OTHER HELO DEVELOPMENT 33,978 24,978 33,978 .............. +9,000 AV-8B AIRCRAFT--ENG DEV 32,789 32,789 17,535 -15,254 -15,254 STANDARDS DEVELOPMENT 84,988 82,988 76,988 -8,000 -6,000 MULTI-MISSION HELICOPTER UPGRADE DEVELOPMENT 6,866 6,866 6,866 .............. .............. AIR/OCEAN EQUIPMENT ENGINEERING 4,060 4,060 4,060 .............. .............. P-3 MODERNIZATION PROGRAM 3,451 3,451 3,451 .............. .............. WARFARE SUPPORT SYSTEM 13,071 13,071 11,071 -2,000 -2,000 TACTICAL COMMAND SYSTEM 71,645 71,645 71,645 .............. .............. ADVANCED HAWKEYE 119,065 119,065 129,065 +10,000 +10,000 H-1 UPGRADES 31,105 31,105 31,105 .............. .............. ACOUSTIC SEARCH SENSORS 34,299 34,299 34,299 .............. .............. V-22A 54,412 45,412 54,412 .............. +9,000 AIR CREW SYSTEMS DEVELOPMENT 2,717 2,717 2,717 .............. .............. EA-18 13,009 13,009 13,009 .............. .............. ELECTRONIC WARFARE DEVELOPMENT 51,304 51,304 51,304 .............. .............. VH-71A EXECUTIVE HELO DEVELOPMENT 61,163 41,163 61,163 .............. +20,000 NEXT GENERATION JAMMER [NGJ] 187,024 187,024 167,024 -20,000 -20,000 JOINT TACTICAL RADIO SYSTEM--NAVY [JTRS-NAVY] 337,480 257,480 337,480 .............. +80,000 SURFACE COMBATANT COMBAT SYSTEM ENGINEERING 260,616 260,616 260,616 .............. .............. LPD-17 CLASS SYSTEMS INTEGRATION 824 824 824 .............. .............. SMALL DIAMETER BOMB [SDB] 31,064 31,064 31,064 .............. .............. STANDARD MISSILE IMPROVEMENTS 63,891 58,391 43,891 -20,000 -14,500 AIRBORNE MCM 73,246 73,246 66,996 -6,250 -6,250 MARINE AIR GROUND TASK FORCE ELECTRONIC WARFARE 10,568 10,568 10,568 .............. .............. NAVAL INTEGRATED FIRE CONTROL-COUNTER AIR SYSTEMS ENG 39,974 39,974 39,974 .............. .............. FUTURE UNMANNED CARRIER-BASED STRIKE SYSTEM 122,481 122,481 102,481 -20,000 -20,000 ADVANCED ABOVE WATER SENSORS 255,516 255,516 41,895 -213,621 -213,621 1AIR AND MISSILE DEFENSE RADAR .............. .............. 223,621 +223,621 +223,621 SSN-688 AND TRIDENT MODERNIZATION 82,620 82,620 82,620 .............. .............. AIR CONTROL 5,633 5,633 5,633 .............. .............. SHIPBOARD AVIATION SYSTEMS 55,826 55,826 55,826 .............. .............. COMBAT INFORMATION CENTER CONVERSION 918 918 918 .............. .............. NEW DESIGN SSN 165,230 180,230 75,230 -90,000 -105,000 SUBMARINE TACTICAL WARFARE SYSTEM 49,141 49,141 49,141 .............. .............. SHIP CONTRACT DESIGN/LIVE FIRE T&E 196,737 176,737 196,737 .............. +20,000 NAVY TACTICAL COMPUTER RESOURCES 3,889 3,889 3,889 .............. .............. MINE DEVELOPMENT 8,335 8,335 8,335 .............. .............. LIGHTWEIGHT TORPEDO DEVELOPMENT 49,818 59,818 36,452 -13,366 -23,366 JOINT SERVICE EXPLOSIVE ORDNANCE DEVELOPMENT 10,099 10,099 8,099 -2,000 -2,000 PERSONNEL, TRAINING, SIMULATION, AND HUMAN FACTORS 7,348 7,348 5,348 -2,000 -2,000 JOINT STANDOFF WEAPON SYSTEMS 5,518 5,518 5,518 .............. .............. SHIP SELF DEFENSE (DETECT & CONTROL) 87,662 87,662 87,662 .............. .............. SHIP SELF DEFENSE (ENGAGE: HARD KILL) 64,079 64,079 64,079 .............. .............. SHIP SELF DEFENSE (ENGAGE: SOFT KILL/EW) 151,489 151,489 139,489 -12,000 -12,000 MEDICAL DEVELOPMENT 12,707 41,707 12,707 .............. -29,000 NAVIGATION/ID SYSTEM 47,764 47,764 41,764 -6,000 -6,000 JOINT STRIKE FIGHTER [JSF]--EMD 737,149 733,949 722,149 -15,000 -11,800 JOINT STRIKE FIGHTER [JSF] 743,926 740,726 720,209 -23,717 -20,517 INFORMATION TECHNOLOGY DEVELOPMENT 12,143 12,143 12,143 .............. .............. INFORMATION TECHNOLOGY DEVELOPMENT 72,209 72,209 72,209 .............. .............. CH-53K 606,204 606,204 606,204 .............. .............. MULTI-MISSION MARITIME AIRCRAFT [MMA] 421,102 436,102 394,102 -27,000 -42,000 DDG-1000 124,655 124,655 124,655 .............. .............. TACTICAL COMMAND SYSTEM--MIP 1,170 1,170 1,170 .............. .............. TACTICAL CRYPTOLOGIC SYSTEMS 23,255 23,255 23,255 .............. .............. --------------------------------------------------------------------------------- TOTAL, ENGINEERING & MANUFACTURING DEVELOPMENT 5,747,232 5,664,332 5,484,645 -262,587 -179,687 RDT&E MANAGEMENT SUPPORT THREAT SIMULATOR DEVELOPMENT 30,790 30,790 30,790 .............. .............. TARGET SYSTEMS DEVELOPMENT 59,221 59,221 59,221 .............. .............. MAJOR T&E INVESTMENT 35,894 35,894 35,894 .............. .............. JOINT THEATER AIR AND MISSILE DEFENSE ORGANIZATION 7,573 7,573 6,573 -1,000 -1,000 STUDIES AND ANALYSIS SUPPORT--NAVY 20,963 20,963 17,963 -3,000 -3,000 CENTER FOR NAVAL ANALYSES 46,856 46,856 46,856 .............. .............. TECHNICAL INFORMATION SERVICES 796 796 796 .............. .............. MANAGEMENT, TECHNICAL & INTERNATIONAL SUPPORT 32,782 32,782 47,782 +15,000 +15,000 STRATEGIC TECHNICAL SUPPORT 3,306 3,306 3,306 .............. .............. RDT&E SCIENCE AND TECHNOLOGY MANAGEMENT 70,302 70,302 70,302 .............. .............. RDT&E SHIP AND AIRCRAFT SUPPORT 144,033 144,033 144,033 .............. .............. TEST AND EVALUATION SUPPORT 342,298 372,298 342,298 .............. -30,000 OPERATIONAL TEST AND EVALUATION CAPABILITY 16,399 16,399 16,399 .............. .............. NAVY SPACE AND ELECTRONIC WARFARE [SEW] SUPPORT 4,579 4,579 4,579 .............. .............. SEW SURVEILLANCE/RECONNAISSANCE SUPPORT 8,000 8,000 8,000 .............. .............. MARINE CORPS PROGRAM WIDE SUPPORT 18,490 18,490 18,490 .............. .............. TACTICAL CRYPTOLOGIC ACTIVITIES 2,795 2,795 2,795 .............. .............. --------------------------------------------------------------------------------- TOTAL, RDT&E MANAGEMENT SUPPORT 845,077 875,077 856,077 +11,000 -19,000 OPERATIONAL SYSTEMS DEVELOPMENT UNMANNED COMBAT AIR VEHICLE [UCAV] ADVANCED COMPONENT. 142,282 142,282 142,282 .............. .............. STRATEGIC SUB & WEAPONS SYSTEM SUPPORT 105,892 105,892 105,892 .............. .............. SSBN SECURITY TECHNOLOGY PROGRAM 34,729 34,729 34,729 .............. .............. SUBMARINE ACOUSTIC WARFARE DEVELOPMENT 1,434 1,434 1,434 .............. .............. NAVY STRATEGIC COMMUNICATIONS 19,208 19,208 19,208 .............. .............. RAPID TECHNOLOGY TRANSITION [RTT] 25,566 25,566 25,566 .............. .............. F/A-18 SQUADRONS 188,299 168,299 170,299 -18,000 +2,000 E-2 SQUADRONS 8,610 8,610 8,610 .............. .............. FLEET TELECOMMUNICATIONS (TACTICAL) 15,695 15,695 15,695 .............. .............. SURFACE SUPPORT 4,171 4,171 3,371 -800 -800 TOMAHAWK AND TOMAHAWK MISSION PLANNING CENTER [TMPC] 11,265 11,265 11,265 .............. .............. INTEGRATED SURVEILLANCE SYSTEM 45,922 45,922 45,922 .............. .............. AMPHIBIOUS TACTICAL SUPPORT UNITS 8,435 8,435 8,435 .............. .............. GROUND/AIR TASK ORIENTED RADAR 75,088 75,088 75,088 .............. .............. CONSOLIDATED TRAINING SYSTEMS DEVELOPMENT 20,229 20,229 18,544 -1,685 -1,685 CRYPTOLOGIC DIRECT SUPPORT 1,756 1,756 1,756 .............. .............. ELECTRONIC WARFARE [EW] READINESS SUPPORT 19,843 19,843 19,843 .............. .............. HARM IMPROVEMENT 11,477 11,477 11,477 .............. .............. TACTICAL DATA LINKS 118,818 118,818 90,618 -28,200 -28,200 SURFACE ASW COMBAT SYSTEM INTEGRATION 27,342 27,342 27,342 .............. .............. MK-48 ADCAP 28,717 38,717 28,717 .............. -10,000 AVIATION IMPROVEMENTS 89,157 89,157 89,157 .............. .............. NAVY SCIENCE ASSISTANCE PROGRAM 3,450 3,450 3,450 .............. .............. OPERATIONAL NUCLEAR POWER SYSTEMS 86,435 86,435 86,435 .............. .............. MARINE CORPS COMMUNICATIONS SYSTEMS 219,054 219,054 206,054 -13,000 -13,000 MARINE CORPS GROUND COMBAT/SUPPORTING ARMS SYSTEMS 181,693 181,693 171,693 -10,000 -10,000 MARINE CORPS COMBAT SERVICES SUPPORT 58,393 58,393 54,393 -4,000 -4,000 USMC INTELLIGENCE/ELECTRONIC WARFARE SYSTEMS (MIP) 22,966 22,966 22,966 .............. .............. TACTICAL AIM MISSILES 21,107 21,107 21,107 .............. .............. ADVANCED MEDIUM RANGE AIR-TO-AIR MISSILE [AMRAAM] 2,857 2,857 2,857 .............. .............. JOINT HIGH SPEED VESSEL [JHSV] 1,932 1,932 1,932 .............. .............. SATELLITE COMMUNICATIONS (SPACE) 188,482 188,482 188,482 .............. .............. CONSOLIDATED AFLOAT NETWORK ENTERPRISE SERVICES 16,749 16,749 16,749 .............. .............. INFORMATION SYSTEMS SECURITY PROGRAM 26,307 26,307 26,307 .............. .............. WWMCCS/Global Command and Control System 500 500 500 .............. .............. COBRA JUDY 17,091 17,091 17,091 .............. .............. NAVY METEOROLOGICAL AND OCEAN SENSORS-SPACE [METOC] 810 810 810 .............. .............. JOINT MILITARY INTELLIGENCE PROGRAMS 8,617 8,617 8,617 .............. .............. TACTICAL UNMANNED AERIAL VEHICLES 9,066 9,066 7,566 -1,500 -1,500 MANNED RECONNAISSANCE SYSTEMS 30,654 30,654 30,654 .............. .............. DISTRIBUTED COMMON GROUND SYSTEMS/SURFACE SYSTEMS 25,917 25,917 25,917 .............. .............. DISTRIBUTED COMMON GROUND SYSTEMS/SURFACE SYSTEMS 14,676 14,676 14,676 .............. .............. RQ-4 UAV 657,483 657,483 657,483 .............. .............. MQ-8 UAV 99,600 33,600 99,600 .............. +66,000 RQ-11 UAV 495 495 495 .............. .............. RQ-7 UAV 863 863 863 .............. .............. SMALL (LEVEL 0) TACTICAL UAS [STUASL0] 9,734 9,734 9,734 .............. .............. RQ-21A 22,343 22,343 22,343 .............. .............. MODELING AND SIMULATION SUPPORT 5,908 5,908 5,908 .............. .............. DEPOT MAINTENANCE (NON-IF) 27,391 27,391 27,391 .............. .............. INDUSTRIAL PREPAREDNESS 54,879 64,879 74,879 +20,000 +10,000 MARITIME TECHNOLOGY (MARITECH) 5,000 5,000 5,000 .............. .............. --------------------------------------------------------------------------------- TOTAL, OPERATIONAL SYSTEMS DEVELOPMENT 2,824,387 2,758,387 2,767,202 -57,185 +8,815 CLASSIFIED PROGRAMS 1,151,159 1,351,159 1,136,159 -15,000 -215,000 --------------------------------------------------------------------------------- TOTAL, RESEARCH, DEVELOPMENT, TEST & EVAL, NAVY 16,882,877 16,987,768 16,646,307 -236,570 -341,461 -------------------------------------------------------------------------------------------------------------------------------------------------------- COMMITTEE RECOMMENDED ADJUSTMENTS The following table details the adjustments recommended by the Committee: [In thousands of dollars] ---------------------------------------------------------------------------------------------------------------- Change from Line Item 2013 budget Committee budget estimate recommendation estimate ---------------------------------------------------------------------------------------------------------------- 3 Defense Research Sciences 473,070 483,070 +10,000 Nanotechnology Research .............. .............. +10,000 4 Power Projection Applied Research 89,189 99,189 +10,000 Power Projection Applied Research--program increase .............. .............. +10,000 5 Force Protection Applied Research 143,301 213,301 +70,000 Alternative energy research .............. .............. +40,000 Materials research and technology .............. .............. +15,000 Power generation and storage research .............. .............. +15,000 19 Electromagnetic Systems Advanced Technology 54,858 64,858 +10,000 Advanced radar research .............. .............. +10,000 22 Future Naval Capabilities Advanced Technology Development 256,382 293,382 +37,000 Technology Transition--restore unjustified reduction .............. .............. +37,000 35 Surface and Shallow Water Mine Countermeasures 190,622 188,622 -2,000 Excess to need .............. .............. -2,000 44 Advanced Submarine System Development 555,123 77,028 -478,095 Transfer to RDN Line 44X Ohio class replacement .............. .............. -483,095 program Seawolf risk reduction efforts .............. .............. +5,000 44X Ohio class replacement program .............. 483,095 +483,095 Transfer from RDN Line 44 Advanced Submarine System .............. .............. +483,095 Development 47 Ship Preliminary Design and Feasibility Studies 13,710 43,710 +30,000 TAO(X) Design .............. .............. +30,000 50 CHALK EAGLE 509,988 499,988 -10,000 Unjustified cost growth .............. .............. -10,000 51 Littoral Combat Ship [LCS] 429,420 416,920 -12,500 Reduction to Training architecture .............. .............. -12,500 52 Combat System Integration 56,551 50,551 -6,000 Program behind in execution .............. .............. -6,000 54 Marine Corps Assault Vehicles 95,182 83,182 -12,000 Program behind in execution .............. .............. -12,000 66 RETRACT ELM 174,014 162,014 -12,000 Program behind in execution .............. .............. -12,000 73 Joint Precision Approach and Landing Systems--Dem/Val 137,369 135,454 -1,915 Program Management cost growth .............. .............. -1,915 78 Joint Counter Radio Controlled IED Electronic Warfare 71,300 51,426 -19,874 [JCREW] Unjustified miscellaneous contract .............. .............. -4,364 Program Execution .............. .............. -15,510 80 Space and Electronic Warfare [SEW] Architecture/ 31,549 28,949 -2,600 Engineering Support Program behind in execution .............. .............. -2,600 83 Joint Light Tactical Vehicle [JLTV] Engineering and 44,500 38,591 -5,909 Manufacturing Development Ph Contract award delay .............. .............. -5,909 88 AV-8B Aircraft--Eng Dev 32,789 17,535 -15,254 Excess functional control computer funding .............. .............. -15,254 89 Standards Development 84,988 76,988 -8,000 Program behind in execution .............. .............. -8,000 93 Warfare Support System 13,071 11,071 -2,000 Program behind in execution .............. .............. -2,000 95 Advanced Hawkeye 119,065 129,065 +10,000 Advanced radar research .............. .............. +10,000 103 Next Generation Jammer [NGJ] 187,024 167,024 -20,000 Milestone delay .............. .............. -20,000 108 Standard Missile Improvements 63,891 43,891 -20,000 Modernization program delay due to development issues .............. .............. -20,000 109 Airborne MCM 73,246 66,996 -6,250 Program not meeting key performance parameters .............. .............. -3,000 Overall program behind in execution .............. .............. -3,250 112 Unmanned Carrier Launched Airborne Surveillance and 122,481 102,481 -20,000 Strike [UCLASS] System Milestone A slipped--program behind schedule .............. .............. -20,000 113 Advanced Above Water Sensors 255,516 41,895 -213,621 Transfer to RDN Line 113X Air and Missile Defense .............. .............. -223,621 Radar Advanced radar research .............. .............. +10,000 113X Air and Missile Defense Radar .............. 223,621 +223,621 Transfer from RDN Line 113 Advanced Above Water .............. .............. +223,621 Sensors 118 New Design SSN 165,230 75,230 -90,000 Virginia Payload early to need .............. .............. -90,000 123 Lightweight Torpedo Development 49,818 36,452 -13,366 Program forward financed .............. .............. -13,366 124 Joint Service Explosive Ordnance Development 10,099 8,099 -2,000 Program behind in execution .............. .............. -2,000 125 Personnel, Training, Simulation, and Human Factors 7,348 5,348 -2,000 Program behind in execution .............. .............. -2,000 129 Ship Self Defense (Engage: Soft Kill/EW) 151,489 139,489 -12,000 Program behind in execution .............. .............. -12,000 132 Navigation/ID System 47,764 41,764 -6,000 Program behind in execution .............. .............. -6,000 133 Joint Strike Fighter [JSF]--EMD 737,149 722,149 -15,000 Development Support excess to need .............. .............. -15,000 134 Joint Strike Fighter [JSF]--EMD 743,926 720,209 -23,717 Block IV development ahead of need .............. .............. -8,717 Development Support excess to need .............. .............. -15,000 140 Multi-Mission Maritime Aircraft [MMA] 421,102 394,102 -27,000 Spiral 1 award development delay .............. .............. -20,000 Spiral 2 award development delay .............. .............. -7,000 149 Joint Theater Air and Missile Defense Organization 7,573 6,573 -1,000 Program behind in execution .............. .............. -1,000 150 Studies and Analysis Support--Navy 20,963 17,963 -3,000 Program behind in execution .............. .............. -3,000 154 Management, Technical and International Support 32,782 47,782 +15,000 Printed Circuit Board Executive Agent--Funds Previous .............. .............. +15,000 NDAA mandate 175 F/A-18 Squadrons 188,299 170,299 -18,000 Program behind in execution .............. .............. -18,000 178 Surface Support 4,171 3,371 -800 Program behind in execution .............. .............. -800 183 Consolidated Training Systems Development 20,229 18,544 -1,685 Program behind in execution .............. .............. -1,685 187 Tactical Data Links 118,818 90,618 -28,200 Program behind in execution .............. .............. -28,200 193 Marine Corps Communications Systems 219,054 206,054 -13,000 Common aviation command and control system late .............. .............. -9,000 contract award Marine personnel carrier--excess program management .............. .............. -4,000 194 Marine Corps Ground Combat/Supporting Arms Systems 181,693 171,693 -10,000 Program behind in execution .............. .............. -10,000 195 Marine Corps Combat Services Support 58,393 54,393 -4,000 Program behind in execution .............. .............. -4,000 213 Tactical Unmanned Aerial Vehicles 9,066 7,566 -1,500 Contract award delay .............. .............. -1,500 229 Industrial Preparedness 54,879 74,879 +20,000 Industrial preparedness .............. .............. +20,000 999 Classified Programs 1,151,159 1,136,159 -15,000 Classified adjustment .............. .............. -15,000 ---------------------------------------------------------------------------------------------------------------- Ocean Renewable Energy.--The Committee commends the Navy's efforts to support ocean renewable energy testing, research, development, and deployment for maritime security systems, support at-sea surveillance and communications systems, and further opportunities to reduce the cost of energy and increase energy security at coastal Department of Defense facilities. The Committee encourages the Navy to continue its investments in developing ocean renewable energy technologies and to coordinate with the Department of Energy and designated National Marine Renewable Energy Centers for ocean renewable energy demonstration activities at or near Department of Defense facilities. The Committee understands the Navy's goal is to produce 50 percent of its shore-based energy requirements from alternative sources by 2020 and notes that deepwater offshore wind and other renewable energy sources could offer advantages as an electricity source for Navy facilities. Not later than 90 days after enactment of this act, the Department shall provide a briefing to the congressional defense committees on current and future programs related to ocean renewable energy research and development activities and provide an analysis of the locations within the United States that such activities would be viable. Automated Test and Re-Test.--The Navy's automated test and re-test [ATRT] program was initiated to focus on reducing test time, fielding higher-quality software and promoting the re-use of tests and software. The Committee is aware that application of ATRT has dramatically reduced system and subsystem test execution times and costs while conducting more thorough testing. Recognizing these benefits, the Navy's Program Executive Officer for Integrated Warfare Systems 1.0 directed each agency under his purview to integrate ATRT into their processes and standard operation procedures. These cost reductions and efficiencies should be implemented Navy-wide and the Committee expects to see the billions of dollars of savings reflected in the Department's fiscal year 2014 budget submission and the future years defense program. Next Generation Jammer [NGJ] Development.--The fiscal year 2013 request includes $187,024,000 for Research, Development, Test and Evaluation for the Navy NGJ program. Due to a delay in the technology development phase that was scheduled for fiscal year 2012 but has now moved to late fiscal year 2013, the Committee recommends a reduction of $20,000,000. In addition, the Committee directs the Government Accountability Office to conduct a review of the program by May 2013 to determine if there are redundancies across the services and assess whether this effort should become a joint service solution. New Design Submarine Development.--The fiscal year 2013 request includes $165,230,000 for Research, Development, Test and Evaluation for the Navy's New Design Submarine program. Included in the request is $99,868,000 to begin development of a new Virginia-class Payload Module [VPM]. The Committee is concerned that increasing the Virginia-class submarine size by one-third to accommodate a 93.7-foot module in the submarine's center will result in instability to proven submarine design, disruption to a stable production line, and add significant cost risk. Preliminary cost estimates indicate development alone will be $800,000,000. The Committee is also concerned with the lack of defined requirements and cost estimate for an Acquisition Category [ACAT] I Major Defense Acquisition Programs [MDAPs] modification. For example, it is not yet clear what payloads would be carried, how many VPM's are required, and how the VPM may alter the Virginia-class concept of operations. In addition, VPM will not go on contract until late fiscal year 2013. For these reasons, the Committee finds it is premature to invest nearly $100,000,000 into this new program and recommends a reduction of $90,000,000 to the request. The Committee directs the remaining funds to be used to validate the VPM requirement and cost estimate with the Joint Requirement Oversight Council, to ensure the VPM program is subject to the capability and acquisition rigor, typical of an ACAT I MDAP. Ship Contract Design/Live Fire Test and Evaluation.--The fiscal year 2013 request includes $196,737,000 for Research, Development, Test and Evaluation for Ship Contract Design/Live Fire Test and Evaluation. This program is experiencing delays in the development phase related to the Ship to Shore connector and is carrying large unobligated balances forward from fiscal year 2012 to fiscal year 2013. Therefore, the Committee encourages the Navy to apply these unobligated balances toward the alternative shock test program to bridge the alternative shock test program's fiscal year 2013 funding gap. The Committee understands that the alternative shock trial testing is safer for the environment, more cost and time effective, and leverages commercial off-the-shelf technology. Multimission Maritime Aircraft [MMA] Development Concurrency.--The fiscal year 2013 request includes $421,102,000 for Research, Development, Test and Evaluation for the Navy MMA program. The MMA program is currently in the development phase scheduled to complete late fiscal year 2013. The Committee is concerned with concurrency in development since, in addition to the baseline development, the program is requesting to begin spiral one and spiral two post development programs. Therefore, the Committee recommends a reduction of $27,000,000 to this program, and directs the Secretary of the Navy to create a Joint Requirement Oversight Council approved modernization roadmap to validate the additional capabilities required for MMA. Industrial Preparedness.--The fiscal year 2013 budget request proposes $54,879,000 for the Navy's Industrial Preparedness effort. This program funds the development of manufacturing technologies intended to improve the productivity and responsiveness of the U.S. defense industrial base. The Committee recommends an additional $20,000,000 above the request to accelerate shipbuilding affordability initiatives and expects the Navy to allocate overall program shipbuilding affordability funding proportionally to the following major shipbuilding categories: aircraft carriers, large surface combatants, small surface combatants, attack submarines, and amphibious warfare ships. Research, Development, Test and Evaluation, Air Force Appropriations, 2012.................................... $26,535,996,000 Budget estimate, 2013................................... 25,428,046,000 House allowance......................................... 25,117,692,000 Committee recommendation................................ 25,374,286,000 The Committee recommends an appropriation of $25,374,286,000. This is $53,760,000 below the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [In thousands of dollars] -------------------------------------------------------------------------------------------------------------------------------------------------------- Change from 2013 budget House Committee ------------------------------- Item estimate allowance recommendation Budget House estimate allowance -------------------------------------------------------------------------------------------------------------------------------------------------------- RESEARCH, DEVELOPMENT, TEST & EVAL, AIR FORCE BASIC RESEARCH DEFENSE RESEARCH SCIENCES 361,787 361,787 361,787 .............. .............. UNIVERSITY RESEARCH INITIATIVES 141,153 141,153 141,153 .............. .............. HIGH ENERGY LASER RESEARCH INITIATIVES 13,094 13,094 13,094 .............. .............. --------------------------------------------------------------------------------- TOTAL, BASIC RESEARCH 516,034 516,034 516,034 .............. .............. APPLIED RESEARCH MATERIALS 114,166 114,166 124,166 +10,000 +10,000 AEROSPACE VEHICLE TECHNOLOGIES 120,719 120,719 120,719 .............. .............. HUMAN EFFECTIVENESS APPLIED RESEARCH 89,319 89,319 89,319 .............. .............. AEROSPACE PROPULSION 232,547 232,547 232,547 .............. .............. AEROSPACE SENSORS 127,637 127,637 127,637 .............. .............. SPACE TECHNOLOGY 98,375 98,375 98,375 .............. .............. CONVENTIONAL MUNITIONS 77,175 77,175 77,175 .............. .............. DIRECTED ENERGY TECHNOLOGY 106,196 106,196 85,317 -20,879 -20,879 DOMINANT INFORMATION SCIENCES AND METHODS 104,362 104,362 104,362 .............. .............. HIGH ENERGY LASER RESEARCH 38,557 38,557 38,557 .............. .............. --------------------------------------------------------------------------------- TOTAL, APPLIED RESEARCH 1,109,053 1,109,053 1,098,174 -10,879 -10,879 ADVANCED TECHNOLOGY DEVELOPMENT ADVANCED MATERIALS FOR WEAPON SYSTEMS 47,890 47,890 62,890 +15,000 +15,000 SUSTAINMENT SCIENCE AND TECHNOLOGY [S&T] 6,565 6,565 6,565 .............. .............. ADVANCED AEROSPACE SENSORS 37,657 37,657 37,657 .............. .............. AEROSPACE TECHNOLOGY DEV/DEMO 81,376 81,376 81,376 .............. .............. AEROSPACE PROPULSION AND POWER TECHNOLOGY 151,152 151,152 166,152 +15,000 +15,000 ELECTRONIC COMBAT TECHNOLOGY 32,941 32,941 26,941 -6,000 -6,000 ADVANCED SPACECRAFT TECHNOLOGY 64,557 64,557 64,557 .............. .............. MAUI SPACE SURVEILLANCE SYSTEM (MSSS) 29,256 29,256 29,256 .............. .............. HUMAN EFFECTIVENESS ADVANCED TECHNOLOGY DEVELOPMENT 21,523 21,523 21,523 .............. .............. CONVENTIONAL WEAPONS TECHNOLOGY 36,352 36,352 36,352 .............. .............. ADVANCED WEAPONS TECHNOLOGY 19,004 19,004 19,004 .............. .............. MANUFACTURING TECHNOLOGY PROGRAM 37,045 57,045 37,045 .............. -20,000 BATTLESPACE KNOWLEDGE DEVELOPMENT & DEMONSTRATION 31,419 31,419 31,419 .............. .............. --------------------------------------------------------------------------------- TOTAL, ADVANCED TECHNOLOGY DEVELOPMENT 596,737 616,737 620,737 +24,000 +4,000 ADVANCED COMPONENT DEVELOPMENT INTELLIGENCE ADVANCED DEVELOPMENT 3,866 3,866 3,866 .............. .............. PHYSICAL SECURITY EQUIPMENT 3,704 3,704 3,704 .............. .............. ADVANCED EHF MILSATCOM (SPACE) 229,171 199,171 257,671 +28,500 +58,500 POLAR MILSATCOM (SPACE) 120,676 120,676 120,676 .............. .............. SPACE CONTROL TECHNOLOGY 25,144 25,144 23,144 -2,000 -2,000 COMBAT IDENTIFICATION TECHNOLOGY 32,243 29,243 32,243 .............. +3,000 NATO RESEARCH AND DEVELOPMENT 4,507 4,507 4,507 .............. .............. INTERNATIONAL SPACE COOPERATIVE R&D 652 652 652 .............. .............. SPACE PROTECTION PROGRAM [SPP] 10,429 10,429 10,429 .............. .............. INTEGRATED BROADCAST SERVICE 19,938 19,938 19,938 .............. .............. INTERCONTINENTAL BALLISTIC MISSILE 71,181 71,181 71,181 .............. .............. WIDEBAND GAPFILLER SYSTEM RDT&E (SPACE) 12,027 12,027 12,027 .............. .............. POLLUTION PREVENTION (DEM/VAL) 2,054 2,054 1,054 -1,000 -1,000 JOINT PRECISION APPROACH AND LANDING SYSTEMS 57,975 57,975 12,975 -45,000 -45,000 LONG RANGE STRIKE 291,742 291,742 291,742 .............. .............. BATTLE MGMT COM & CTRL SENSOR DEVELOPMENT 114,417 124,417 101,417 -13,000 -23,000 TECHNOLOGY TRANSFER 2,576 2,576 2,576 .............. .............. HARD AND DEEPLY BURIED TARGET DEFEAT SYSTEM 16,711 16,711 16,711 .............. .............. REQUIREMENTS ANALYSIS AND MATURATION 16,343 16,343 16,343 .............. .............. WEATHER SATELLITE FOLLOW-ON 2,000 2,000 .............. -2,000 -2,000 GROUND ATTACK WEAPONS FUZE DEVELOPMENT 9,423 9,423 9,423 .............. .............. OPERATIONALLY RESPONSIVE SPACE .............. .............. 110,000 +110,000 +110,000 TECH TRANSITION PROGRAM 37,558 3,058 34,558 -3,000 +31,500 NAVSTAR GLOBAL POSITIONING SYSTEM (USER EQUIPMENT) 96,840 86,840 76,840 -20,000 -10,000 --------------------------------------------------------------------------------- TOTAL, ADVANCED COMPONENT DEVELOPMENT 1,181,177 1,113,677 1,233,677 +52,500 +120,000 ENGINEERING & MANUFACTURING DEVELOPMENT GLOBAL BROADCAST SERVICE [GBS] 14,652 14,652 14,652 .............. .............. NUCLEAR WEAPONS SUPPORT 25,713 25,713 .............. -25,713 -25,713 SPECIALIZED UNDERGRADUATE FLIGHT TRAINING 6,583 1,583 1,983 -4,600 +400 ELECTRONIC WARFARE DEVELOPMENT 1,975 1,975 1,975 .............. .............. JOINT TACTICAL RADIO 2,594 2,594 .............. -2,594 -2,594 TACTICAL DATA NETWORKS ENTERPRISE 24,534 24,534 24,534 .............. .............. PHYSICAL SECURITY EQUIPMENT 51 51 51 .............. .............. SMALL DIAMETER BOMB [SDB] 143,000 143,000 138,000 -5,000 -5,000 COUNTERSPACE SYSTEMS 28,797 28,797 27,797 -1,000 -1,000 SPACE SITUATION AWARENESS SYSTEMS 267,252 230,152 267,252 .............. +37,100 AIRBORNE ELECTRONIC ATTACK 4,118 4,118 4,118 .............. .............. SPACE BASED INFRARED SYSTEM [SBIRS] HIGH EMD 448,594 516,594 466,594 +18,000 -50,000 ARMAMENT/ORDNANCE DEVELOPMENT 9,951 9,951 9,951 .............. .............. SUBMUNITIONS 2,567 2,567 2,567 .............. .............. AGILE COMBAT SUPPORT 13,059 13,059 28,059 +15,000 +15,000 LIFE SUPPORT SYSTEMS 9,720 9,720 6,720 -3,000 -3,000 COMBAT TRAINING RANGES 9,222 9,222 9,222 .............. .............. INTELLIGENCE EQUIPMENT 803 803 803 .............. .............. JOINT STRIKE FIGHTER [JSF] 1,210,306 1,207,999 1,169,589 -40,717 -38,410 INTERCONTINENTAL BALLISTIC MISSILE 135,437 135,437 135,437 .............. .............. EVOLVED EXPENDABLE LAUNCH VEHICLE PROGRAM (SPACE) 7,980 32,980 7,980 .............. -25,000 LONG RANGE STANDOFF WEAPON 2,004 2,004 2,004 .............. .............. ICBM FUZE MODERNIZATION 73,512 73,512 73,512 .............. .............. F-22 MODERNIZATION INCREMENT 3.2B 140,100 140,100 140,100 .............. .............. NEXT GENERATION AERIAL REFUELING AIRCRAFT 1,815,588 1,815,588 1,738,488 -77,100 -77,100 CSAR HH-60 RECAPITALIZATION 123,210 123,210 115,210 -8,000 -8,000 HC/MC-130 RECAP RDT&E 19,039 19,039 10,739 -8,300 -8,300 B-2 DEFENSIVE MANAGEMENT SYSTEM 281,056 281,056 248,056 -33,000 -33,000 NUCLEAR WEAPONS MODERNIZATION 80,200 80,200 80,200 .............. .............. READINESS TRAINING RANGES, OPERATIONS AND MAINTENANCE 310 310 310 .............. .............. FULL COMBAT MISSION TRAINING 14,861 14,861 14,861 .............. .............. MC-12 19,949 19,949 19,949 .............. .............. JOINT CARGO AIRCRAFT [JCA] .............. 25,000 6,500 +6,500 -18,500 CV-22 28,027 28,027 28,027 .............. .............. AIRBORNE SENIOR LEADER C3 [SLC3S] 1,960 1,960 1,960 .............. .............. --------------------------------------------------------------------------------- TOTAL, ENGINEERING & MANUFACTURING DEVELOPMENT 4,966,724 5,040,317 4,797,200 -169,524 -243,117 RDT&E MANAGEMENT SUPPORT THREAT SIMULATOR DEVELOPMENT 22,812 22,812 22,812 .............. .............. MAJOR T&E INVESTMENT 42,236 42,236 42,236 .............. .............. RAND PROJECT AIR FORCE 25,579 25,579 25,579 .............. .............. INITIAL OPERATIONAL TEST & EVALUATION 16,197 16,197 16,197 .............. .............. TEST AND EVALUATION SUPPORT 722,071 722,071 722,071 .............. .............. ROCKET SYSTEMS LAUNCH PROGRAM (SPACE) 16,200 16,200 16,200 .............. .............. SPACE TEST PROGRAM [STP] 10,051 10,051 45,051 +35,000 +35,000 FACILITIES RESTORATION & MODERNIZATION--TEST & EVAL 42,597 42,597 42,597 .............. .............. FACILITIES SUSTAINMENT--TEST AND EVALUATION SUPPORT 27,301 27,301 27,301 .............. .............. MULTI-SERVICE SYSTEMS ENGINEERING INITIATIVE 13,964 13,964 13,964 .............. .............. SPACE AND MISSILE CENTER [SMC] CIVILIAN WORKFORCE 203,766 203,766 195,766 -8,000 -8,000 ACQUISITION AND MANAGEMENT SUPPORT 42,430 42,430 32,530 -9,900 -9,900 GENERAL SKILL TRAINING 1,294 1,294 .............. -1,294 -1,294 INTERNATIONAL ACTIVITIES 3,851 3,851 3,851 .............. .............. --------------------------------------------------------------------------------- TOTAL, RDT&E MANAGEMENT SUPPORT 1,190,349 1,190,349 1,206,155 +15,806 +15,806 OPERATIONAL SYSTEMS DEVELOPMENT GPS III--OPERATIONAL CONTROL SEGMENT 371,595 333,295 370,095 -1,500 +36,800 AIR FORCE INTEGRATED MILITARY HUMAN RESOURCES SYSTEM 91,697 91,697 45,697 -46,000 -46,000 ANTI-TAMPER TECHNOLOGY EXECUTIVE AGENCY 17,037 37,037 17,037 .............. -20,000 B-52 SQUADRONS 53,208 18,508 53,208 .............. +34,700 AIR-LAUNCHED CRUISE MISSILE [ALCM] 431 431 431 .............. .............. B-1B SQUADRONS 16,265 16,265 16,265 .............. .............. B-2 SQUADRONS 35,970 35,970 35,970 .............. .............. STRAT WAR PLANNING SYSTEM--USSTRATCOM 30,889 30,889 23,189 -7,700 -7,700 NIGHT FIST--USSTRATCOM 10 10 .............. -10 -10 REGION/SECTOR OPERATION CONTROL CENTER MODERNIZATION 5,609 5,609 5,609 .............. .............. WARFIGHTER RAPID ACQUISITION PROCESS [WRAP] RAPID TRAN 15,098 15,098 5,098 -10,000 -10,000 MQ-9 UAV 147,971 147,971 135,171 -12,800 -12,800 MULTI-PLATFORM ELECTRONIC WARFARE EQUIPMENT 49,848 34,848 49,848 .............. +15,000 A-10 SQUADRONS 13,538 13,538 11,538 -2,000 -2,000 F-16 SQUADRONS 190,257 190,257 176,757 -13,500 -13,500 F-15E SQUADRONS 192,677 192,677 171,677 -21,000 -21,000 MANNED DESTRUCTIVE SUPPRESSION 13,683 13,683 13,683 .............. .............. F-22 SQUADRONS 371,667 371,667 342,667 -29,000 -29,000 F-35 SQUADRONS 8,117 .............. 8,117 .............. +8,117 TACTICAL AIM MISSILES 8,234 8,234 6,634 -1,600 -1,600 ADVANCED MEDIUM RANGE AIR-TO-AIR MISSILE [AMRAAM] 87,041 87,041 77,041 -10,000 -10,000 JOINT HELMET MOUNTED CUEING SYSTEM [JHMCS] 1,472 1,472 1,472 .............. .............. COMBAT RESCUE AND RECOVERY 2,095 2,095 2,095 .............. .............. COMBAT RESCUE--PARARESCUE 1,119 1,119 1,119 .............. .............. AF TENCAP 63,853 63,853 63,853 .............. .............. PRECISION ATTACK SYSTEMS PROCUREMENT 1,063 1,063 1,063 .............. .............. COMPASS CALL 12,094 12,094 12,094 .............. .............. AIRCRAFT ENGINE COMPONENT IMPROVEMENT PROGRAM 187,984 187,984 187,984 .............. .............. JOINT AIR-TO-SURFACE STANDOFF MISSILE [JASSM] 7,950 7,950 7,950 .............. .............. AIR AND SPACE OPERATIONS CENTER [AOC] 76,315 76,315 76,315 .............. .............. CONTROL AND REPORTING CENTER [CRC] 8,653 8,653 8,653 .............. .............. AIRBORNE WARNING AND CONTROL SYSTEM [AWACS] 65,200 48,900 65,200 .............. +16,300 TACTICAL AIRBORNE CONTROL SYSTEMS 5,767 5,767 5,767 .............. .............. COMBAT AIR INTELLIGENCE SYSTEM ACTIVITIES 5,756 5,756 5,756 .............. .............. TACTICAL AIR CONTROL PARTY--MOD 16,226 16,226 16,226 .............. .............. C2ISR TACTICAL DATA LINK 1,633 1,633 1,633 .............. .............. COMMAND AND CONTROL [C2] CONSTELLATION 18,086 18,086 15,786 -2,300 -2,300 DCAPES 15,690 15,690 15,690 .............. .............. JOINT SURVEILLANCE AND TARGET ATTACK RADAR SYSTEM 24,241 24,241 24,241 .............. .............. SEEK EAGLE 22,654 22,654 22,654 .............. .............. USAF MODELING AND SIMULATION 15,501 15,501 15,501 .............. .............. WARGAMING AND SIMULATION CENTERS 5,699 5,699 5,699 .............. .............. DISTRIBUTED TRAINING AND EXERCISES 4,425 4,425 3,225 -1,200 -1,200 MISSION PLANNING SYSTEMS 69,377 69,377 69,377 .............. .............. INFORMATION WARFARE SUPPORT 7,159 7,159 7,159 .............. .............. CYBER COMMAND ACTIVITIES 66,888 66,888 66,888 .............. .............. SPACE SUPERIORITY INTELLIGENCE 12,056 12,056 12,056 .............. .............. E-4B NATIONAL AIRBORNE OPERATIONS CENTER [NAOC] 4,159 4,159 4,159 .............. .............. MINIMUM ESSENTIAL EMERGENCY COMMUNICATIONS NETWORK 20,124 20,124 20,124 .............. .............. INFORMATION SYSTEMS SECURITY PROGRAM 69,133 69,133 69,133 .............. .............. GLOBAL COMBAT SUPPORT SYSTEM 6,512 6,512 3,512 -3,000 -3,000 GLOBAL COMMAND AND CONTROL SYSTEM 4,316 2,316 2,316 -2,000 .............. MILSATCOM TERMINALS 107,237 107,237 107,237 .............. .............. AIRBORNE SIGINT ENTERPRISE 129,106 129,106 109,106 -20,000 -20,000 GLOBAL AIR TRAFFIC MANAGEMENT [GATM] 4,461 4,461 4,461 .............. .............. CYBER SECURITY INITIATIVE 2,055 2,055 2,055 .............. .............. DOD CYBER CRIME CENTER 285 285 285 .............. .............. SATELLITE CONTROL NETWORK (SPACE) 33,773 33,773 33,773 .............. .............. WEATHER SERVICE 29,048 29,048 29,048 .............. .............. AIR TRAFFIC CONTROL, APPROACH, & LANDING SYSTEM [ATC] 43,187 43,187 39,687 -3,500 -3,500 AERIAL TARGETS 50,496 50,496 46,096 -4,400 -4,400 SECURITY AND INVESTIGATIVE ACTIVITIES 354 354 354 .............. .............. ARMS CONTROL IMPLEMENTATION 4,000 4,000 4,000 .............. .............. DEFENSE JOINT COUNTERINTELLIGENCE ACTIVITIES 342 342 .............. -342 -342 NAVSTAR GLOBAL POSITIONING SYSTEM (USER EQUIPMENT) 29,621 29,621 29,621 .............. .............. NAVSTAR GLOBAL POSITIONING SYSTEM (SPACE AND CONTROL) 14,335 14,335 14,335 .............. .............. SPACE AND MISSILE TEST AND EVALUATION CENTER 3,680 3,680 3,680 .............. .............. SPACE WARFARE CENTER 2,430 2,430 2,430 .............. .............. SPACELIFT RANGE SYSTEM (SPACE) 8,760 8,760 8,360 -400 -400 DRAGON U-2 23,644 23,644 23,644 .............. .............. ENDURANCE UNMANNED AERIAL VEHICLES 21,000 31,000 79,000 +58,000 +48,000 AIRBORNE RECONNAISSANCE SYSTEMS 96,735 96,735 76,735 -20,000 -20,000 MANNED RECONNAISSANCE SYSTEMS 13,316 13,316 13,316 .............. .............. DISTRIBUTED COMMON GROUND/SURFACE SYSTEMS 63,501 63,501 48,501 -15,000 -15,000 PREDATOR UAV (JMIP) 9,122 9,122 9,122 .............. .............. RQ-4 UAV 236,265 252,265 236,265 .............. -16,000 NETWORK-CENTRIC COLLABORATIVE TARGET (TIARA) 7,367 7,367 7,367 .............. .............. COMMON DATA LINK [CDL] 38,094 38,094 36,694 -1,400 -1,400 NATO AGS 210,109 210,109 210,109 .............. .............. SUPPORT TO DCGS ENTERPRISE 24,500 24,500 24,500 .............. .............. GPS III SPACE SEGMENT 318,992 318,992 318,992 .............. .............. JSPOC MISSION SYSTEM 54,645 54,645 53,045 -1,600 -1,600 RAPID CYBER ACQUISITION 4,007 4,007 2,007 -2,000 -2,000 INTELLIGENCE SUPPORT TO INFORMATION WARFARE 13,357 13,357 13,357 .............. .............. NUDET DETECTION SYSTEM (SPACE) 64,965 36,565 63,365 -1,600 +26,800 SPACE SITUATION AWARENESS OPERATIONS 19,586 19,586 19,586 .............. .............. SHARED EARLY WARNING [SEW] 1,175 1,175 1,175 .............. .............. C-130 AIRLIFT SQUADRON 5,000 10,000 5,000 .............. -5,000 C-5 AIRLIFT SQUADRONS 35,115 35,115 35,115 .............. .............. C-17 AIRCRAFT 99,225 99,225 86,225 -13,000 -13,000 C-130J PROGRAM 30,652 25,652 20,652 -10,000 -5,000 LARGE AIRCRAFT IR COUNTERMEASURES [LAIRCM] 7,758 7,758 7,758 .............. .............. LIGHT MOBILITY AIRCRAFT [LiMA] 100 .............. .............. -100 .............. KC-10S 24,022 24,022 17,022 -7,000 -7,000 OPERATIONAL SUPPORT AIRLIFT 7,471 7,471 18,571 +11,100 +11,100 SPECIAL TACTICS/COMBAT CONTROL 4,984 4,984 4,984 .............. .............. DEPOT MAINTENANCE (NON-IF) 1,588 1,588 1,588 .............. .............. LOGISTICS SUPPORT ACTIVITIES 577 577 577 .............. .............. LOGISTICS INFORMATION TECHNOLOGY [LOGIT] 119,327 99,327 77,327 -42,000 -22,000 SUPPORT SYSTEMS DEVELOPMENT 15,873 15,873 55,873 +40,000 +40,000 OTHER FLIGHT TRAINING 349 349 349 .............. .............. OTHER PERSONNEL ACTIVITIES 117 117 .............. -117 -117 JOINT PERSONNEL RECOVERY AGENCY 2,018 2,018 2,018 .............. .............. CIVILIAN COMPENSATION PROGRAM 1,561 1,561 1,561 .............. .............. PERSONNEL ADMINISTRATION 7,634 2,634 7,634 .............. +5,000 AIR FORCE STUDIES AND ANALYSIS AGENCY 1,175 1,175 675 -500 -500 FACILITIES OPERATION--ADMINISTRATION 3,491 3,491 3,491 .............. .............. FINANCIAL MANAGEMENT INFORMATION SYSTEMS DEVELOPMENT 100,160 100,160 100,160 .............. .............. ELECTRONIC ACQUISITION SERVICES ENVIRONMENT .............. .............. 4,800 +4,800 +4,800 --------------------------------------------------------------------------------- TOTAL, OPERATIONAL SYSTEMS DEVELOPMENT 4,695,789 4,573,872 4,503,120 -192,669 -70,752 CLASSIFIED PROGRAMS 11,172,183 10,957,653 11,399,189 +227,006 +441,536 --------------------------------------------------------------------------------- TOTAL, RESEARCH, DEVELOPMENT, TEST & EVAL, AIR FORCE 25,428,046 25,117,692 25,374,286 -53,760 +256,594 -------------------------------------------------------------------------------------------------------------------------------------------------------- COMMITTEE RECOMMENDED ADJUSTMENTS The following table details the adjustments recommended by the Committee: [In thousands of dollars] ---------------------------------------------------------------------------------------------------------------- Fiscal year Committee Change from Line Program element title 2012 base recommendation budget estimate ---------------------------------------------------------------------------------------------------------------- 4 Materials 114,166 124,166 +10,000 Nanotechnology research ............... ............... +10,000 11 Directed Energy Technology 106,196 85,317 -20,879 Space Situational Awareness ............... ............... +10,000 Delay electronic laser on a large aircraft ............... ............... -30,879 14 Advanced Materials for Weapon Systems 47,890 62,890 +15,000 Materials research and technology ............... ............... +15,000 18 Aerospace Propulsion and Power Technology 151,152 166,152 +15,000 Silicon carbide research ............... ............... +15,000 19 Electronic Combat Technology 32,941 26,941 -6,000 Protection concepts for 6th generation aircraft ............... ............... -2,000 early to need Rapidly fieldable operational demonstrations-- ............... ............... -4,000 unjustified request 30 Advanced EHF MILSATCOM (SPACE) 229,171 257,671 +28,500 Operationally Responsive Space--transfer to line ............... ............... -1,500 54 Space modernization initiatives--program ............... ............... +30,000 increase 32 Space Control Technology 25,144 23,144 -2,000 Operationally Responsive Space--transfer to line ............... ............... -2,000 54 40 Pollution Prevention--Dem/Val 2,054 1,054 -1,000 Forward financing ............... ............... -1,000 41 Joint Precision Approach and Landing Systems-- Dem/ 57,975 12,975 -45,000 Val Development contract award delay ............... ............... -45,000 43 Battle Mgmt Com & Ctrl Sensor Development 114,417 101,417 -13,000 Excess to need ............... ............... -13,000 48 Weather Satellite Follow-on 2,000 ............... -2,000 Carryover of Fiscal Year 2012 funds ............... ............... -2,000 54 Operationally Responsive Space ............... 110,000 +110,000 Authorized program increase ............... ............... +100,000 Transfer from line 30--Advanced EHF MILSATCOM ............... ............... +1,500 Transfer from line 32--Space Control Technology ............... ............... +2,000 Transfer from line 55--Tech Transition Program ............... ............... +3,000 Transfer from line 69--Space Based Infrared ............... ............... +2,000 System [SBIRS] High EMD Transfer from line 112--Global Positioning ............... ............... +1,500 System III--Operational Control Segment 55 Tech Transition Program 37,558 34,558 -3,000 Operationally Responsive Space--transfer to line ............... ............... -3,000 54 56 NAVSTAR Global Positioning System (User Equipment) 96,840 76,840 -20,000 (SPACE) Reduction to growth due to protracted pre- ............... ............... -20,000 Engineering and Manufacturing Development phase 59 Nuclear Weapons Support 25,713 ............... -25,713 Transfer to Operation and Maintenance, Air Force ............... ............... -25,713 Line 12A--Global C3I and Early Warning 60 Specialized Undergraduate Flight Training 6,583 1,983 -4,600 T-X contract delay ............... ............... -1,600 Joint Primary Aircraft Training System forward ............... ............... -3,000 financing 62 Joint Tactical Radio 2,594 ............... -2,594 Unjustified request ............... ............... -2,594 65 Small Diameter Bomb [SDB]--EMD 143,000 138,000 -5,000 Other Product Development cost growth ............... ............... -5,000 66 Counterspace Systems 28,797 27,797 -1,000 Historical excess from general reductions ............... ............... -1,000 69 Space Based Infrared System [SBIRS] High EMD 448,594 466,594 +18,000 Space Modernization Initiatives--program in- ............... ............... +20,000 crease Operationally Responsive Space--transfer to line ............... ............... -2,000 54 72 Agile Combat Support 13,059 28,059 +15,000 Power generation and storage research ............... ............... +15,000 73 Life Support Systems 9,720 6,720 -3,000 Forward financing ............... ............... -3,000 77 F-35--EMD 1,210,306 1,169,589 -40,717 Block 4 follow-on development early to need ............... ............... -8,117 Security contract unjustified growth ............... ............... -2,600 Unjustified growth in Other ............... ............... -30,000 83 Next Generation Aerial Refueling Aircraft 1,815,588 1,738,488 -77,100 Air Force identified forward financing ............... ............... -77,100 84 CSAR HH-60 Recapitalization 123,210 115,210 -8,000 Unobligated prior year funds ............... ............... -8,000 85 HC/MC-130 Recap RDT&E 19,039 10,739 -8,300 Forward financing ............... ............... -8,300 86 B-2 Defensive Management System 281,056 248,056 -33,000 Program delay ............... ............... -33,000 92 C-27J Airlift Squadrons ............... 6,500 +6,500 Retain Air Force force structure ............... ............... +6,500 102 Space Test Program [STP] 10,051 45,051 +35,000 Authorized program increase ............... ............... +35,000 106 Space and Missile Center [SMC] Civilian Workforce 203,766 195,766 -8,000 Excess to need ............... ............... -8,000 107 Acquisition and Management Support 42,430 32,530 -9,900 Recruiting and Development excessive growth ............... ............... -2,700 Acquisition systems unjustified cost growth ............... ............... -2,400 Transfer Electronic Acquisition Services ............... ............... -4,800 Environment to new line item 108 General Skill Training 1,294 ............... -1,294 Excess to need ............... ............... -1,294 112 Global Positioning System III--Operational Control 371,595 370,095 -1,500 Segment Operationally Responsive Space--transfer to line ............... ............... -1,500 54 114 AF Integrated Personnel and Pay System [AF-IPPS] 91,697 45,697 -46,000 Contract award delay ............... ............... -46,000 121 Strat War Planning System--USSTRATCOM 30,889 23,189 -7,700 SWPS Increment 3 excess to need ............... ............... -7,700 122 Night Fist--USSTRATCOM 10 ............... -10 Unjustified request ............... ............... -10 126 Warfighter Rapid Acquisition Process [WRAP] Rapid 15,098 5,098 -10,000 Transition Fund Unobligated balances ............... ............... -10,000 127 MQ-9 UAV 147,971 135,171 -12,800 Technology Insertion forward financing ............... ............... -12,800 129 A-10 Squadrons 13,538 11,538 -2,000 Forward financing ............... ............... -2,000 130 F-16 Squadrons 190,257 176,757 -13,500 Flight Test unjustified increase ............... ............... -3,500 Combat Avionics Programmed Extension Suite ............... ............... -10,000 program delay 131 F-15E Squadrons 192,677 171,677 -21,000 Forward financing ............... ............... -21,000 133 F-22A Squadrons 371,667 342,667 -29,000 Should cost review savings ............... ............... -29,000 135 Tactical AIM Missiles 8,234 6,634 -1,600 Product Development cost growth ............... ............... -1,600 136 Advanced Medium Range Air-to-Air Missile [AMRAAM] 87,041 77,041 -10,000 Software Improvement unjustified growth ............... ............... -10,000 157 Command and Control [C2] Constellation 18,086 15,786 -2,300 Architecture and Systems Engineering unjustified ............... ............... -2,300 increase 163 Distributed Training and Exercises 4,425 3,225 -1,200 Wargaming unjustified increase ............... ............... -1,200 178 Global Combat Support System 6,512 3,512 -3,000 Program restructure ............... ............... -3,000 179 Global Command and Control System 4,316 2,316 -2,000 Forward financing ............... ............... -2,000 182 Airborne SIGINT Enterprise 129,106 109,106 -20,000 Forward financing ............... ............... -20,000 190 Air Traffic Control, Approach, and Landing System 43,187 39,687 -3,500 [ATCALS] NextGen forward financing ............... ............... -3,500 191 Aerial Targets 50,496 46,096 -4,400 QF-16--late contract award ............... ............... -4,400 196 Defense Joint Counterintelligence Activities 342 ............... -342 Unobligated balances ............... ............... -342 203 Spacelift Range System (SPACE) 8,760 8,360 -400 Historical excess from general reductions ............... ............... -400 206 Endurance Unmanned Aerial Vehicles 21,000 21,000 +58,000 Long Dwell/Persistent ISR response for JUONs CC- ............... ............... +58,000 0151 and CC-0302 207 Airborne Reconnaissance Systems 96,735 76,735 -20,000 Dismount Detection Radar funds excess to ............... ............... -20,000 contract award 209 Distributed Common Ground/Surface Systems 63,501 48,501 -15,000 Data Compression contract award delay ............... ............... -15,000 213 Common Data Link [CDL] 38,094 36,694 -1,400 Unjustified program growth ............... ............... -1,400 217 JSPOC Mission System 54,645 53,045 -1,600 Historical excess from general reductions ............... ............... -1,600 218 Rapid Cyber Acquisition 4,007 2,007 -2,000 Unsustained funding level ............... ............... -2,000 220 NUDET Detection System (SPACE) 64,965 63,365 -1,600 ICADS/UGNT execution delays ............... ............... -1,600 221 Space Situation Awareness Operations 19,586 19,586 ................ Air Force requested internal realignment--U.S.- ............... ............... [11,200] Australia C-Band Radar Project 226 C-17 Aircraft (IF) 99,225 86,225 -13,000 Unobligated balances ............... ............... -13,000 227 C-130J Program 30,652 20,652 -10,000 C130-J forward financing ............... ............... -10,000 229 Light Mobility Aircraft [LiMA] 100 ............... -100 Program terminated ............... ............... -100 231 KC-10s 24,022 17,022 -7,000 Aircraft Modernization Program forward financing ............... ............... -7,000 232 Operational Support Airlift 7,471 18,571 +11,100 Air Force identified shortfall--VC-25 Avionics ............... ............... +11,100 Modernization Program 237 Logistics Information Technology [LOGIT] 119,327 77,327 -42,000 Unobligated balances ............... ............... -42,000 238 Support Systems Development 15,873 55,873 +40,000 Alternative energy research ............... ............... +40,000 242 Other Personnel Activities 117 ............... -117 Unobligated balances ............... ............... -117 246 Air Force Studies and Analysis Agency 1,175 675 -500 Unobligated balances ............... ............... -500 Classified Programs 11,172,183 11,399,189 +227,006 Classified Programs ............... ............... +227,006 Electronic Acquisition Services Environment ............... 4,800 +4,800 Transferred from Acquisition and Management ............... ............... +4,800 Support for better transparency and control ---------------------------------------------------------------------------------------------------------------- Air Force Application of Small Business Innovative Research [SBIR].--During the detailed review of the fiscal year 2013 budget submission, the Committee noted a questionably inconsistent sourcing of funds from line items within the Research, Development, Test and Evaluation, Air Force [RDT&E, AF] appropriation to fund SBIR. Review of the initial data revealed two trends: (1) space programs were heavily sourced to fund SBIR while other portfolios were not taxed, and (2) some programs were sourced higher than the standard 2.7 to 3.1 percent. SBIR should be calculated and applied evenly based on extramural percentages, but it appears the Air Force does not follow this standard calculation procedure. After reviewing more detailed data provided by the Air Force, the Committee found 15 fiscal year 2012 programs were sourced to fund SBIR between 3.7 and 9.6 percent with one program actually sourced 100 percent. Space programs accounted for 53 percent of these programs. In the fiscal year 2011 appropriation, 17 programs were sourced between 3.5 and 15.3 percent with eight of these programs, or 47 percent, falling within the space portfolio. The Committee notes that space- related line items in the RDT&E, AF make up 15 percent of the total line items and is concerned that they are disproportionately taxed to fund SBIR. The Committee is also concerned that the Air Force is using SBIR to circumvent the congressional reprogramming approval process. By sourcing funds through SBIR and below threshold reprogrammings, the Air Force has, in the cases of Joint National Training Center, Advanced Communication Systems, B-52 Squadrons, Aircraft Engine Component Improvement Program, and Information Systems Security Program, reduced the programs past the point that triggers congressional reprogramming approval. The Committee directs the Assistant Secretary of the Air Force for Financial Management to review the current Air Force SBIR sourcing process, develop and implement corrective actions, and within 180 days of enactment of this act provide a report to the congressional defense committees describing the origin of the problem and the corrective actions the Air Force plans to implement to ensure these violations do not occur in the future. Advanced Composite Research and Development.--The Committee encourages the Secretary of the Air Force to conduct a program for advanced composite research and development for aerospace vehicles to demonstrate the ability of advanced composite technology to expand the flight envelope and improve the performance and affordability of current and future aerospace platforms, including unmanned aerial vehicles. Sensors Research by Air Force Minority Leaders Program.-- The Committee encourages the Air Force Research Laboratory to carry out sensors research activities conducted by the Air Force Minority Leaders program for research in the disciplines of materials and processing, sensors, and related enabling academic specialties, and to meet critical defense capabilities, science and technology, future workforce, and technical program objectives for the United States Air Force. Pilot Hearing Protection.--The Committee encourages the Air Force to leverage advances in active noise reduction devices developed by the Combating Terrorism Technology Support program to advance hearing protection for pilots using legacy helmet models. Aerial Internet Protocol Networking.--The Committee is aware of the Air Force research and development efforts to help address complex problems in aerial Internet protocol [IP] networking, to include ensuring IP-based networks deliver rapid, reliable, real-time tactical information. The Committee believes standardization of the IP-based architecture could provide tangible benefit to the warfighter through enhanced tactical situational awareness, improved combat lethality and increased force protection. The Air Force is encouraged to expedite further operational testing of this new capability. Nuclear Weapons Support.--In previous budget submissions, the Research, Development, Test and Evaluation, Air Force [RDT&E, AF] Nuclear Weapons Support line item contained a number of development weapon system programs. In fiscal year 2013, the Air Force transferred all development weapon system programs to more appropriate line items leaving only support funding in the Nuclear Weapons Support line item. The Committee notes that the planned fiscal year 2013 activities are very similar to activities performed by other command functions. Air Combat Command and Air Mobility Command perform the same acquisition insight and weapon system oversight role utilizing the Operation and Maintenance, Air Force account. The Committee believes the Air Force Nuclear Weapons Center should be normalized as part of the Air Force command structure and should be funded similar to other command units. Therefore, the Committee transfers $25,713,000 from RDT&E, AF to Operation and Maintenance, Air Force. Acquisition and Management Support.--With the Air Force's implementation of efficiencies and overall reduction to programs in the fiscal year 2013 budget request, the Committee notes a disproportionate growth in the Acquisition and Management Support line item. This line item, which mainly funds acquisition support and oversight, grows 32.5 percent over the fiscal year 2012 appropriated amount. After specifically questioning the growth of this program, the Air Force identified that $4,800,000 was added for a new contract- writing information system called Electronic Acquisition Services Environment. To ensure future transparency and enable oversight of this new information system, the Committee transfers funding for the Electronic Acquisition Services Environment into a new line item. In addition, since the Air Force did not adequately justify the growth in support costs, the Committee recommends a reduction of $5,100,000, which is consistent with the fiscal year 2012 appropriated level. At the Committee's request, the Air Force provided additional detail for the training and support costs funded under this program. The Committee believes that some of the training courses identified are more properly funded from the Operation and Maintenance, Air Force appropriation. The Committee notes that some of the justified efforts, for example cost estimating, are duplicative of efforts more properly performed by other Air Force organizations. Therefore, the Committee directs the Air Force Administrative Assistant to perform a comprehensive review of the activities performed under this line item to ensure they are properly funded within the Research, Development, Test and Evaluation, Air Force appropriation, and to ensure they do not duplicate efforts more properly performed by other Air Force organizations to include Air Force Material Command and Air Force Financial Management. The Committee also directs the Air Force Administrative Assistant provide a report, within 180 days of enactment of this act, providing the outcome of the review and a summary of corrective actions taken. B-52 Strategic Radar Replacement [SR2].--The Committee is aware the Air Force conducted a lengthy analysis of alternatives in 2011 to address a Strategic Radar Replacement [SR2] for the B-52H. The existing APQ-166 radar was produced in the 1960s, has a 20 to 30 hour mean-time between failure rate, and capability limitations. The Committee understands that the current APQ-166 radar is costly to operate and maintain. Therefore, the Committee encourages the Secretary of the Air Force to reconsider the decision to terminate the SR2 program. Air Force Command, Control, Intelligence, Surveillance, and Reconnaissance [C2ISR] Fleet.--The Committee is aware that the Air Force's critical manned C2ISR aircraft are high-demand assets facing low availability rates, end-of-life issues, and growing sustainment costs. The Committee is also aware that the Air Force recently completed an analysis of alternatives for recapitalization of the ground moving target indicator capability currently met by the Joint Surveillance and Target Attack Radar System [JSTARS] and that the Air Force has deliberately chosen to delay recapitalization due to fiscal limitations. Recognizing that the entire C2ISR fleet will need to be recapitalized around the same time, the Committee encourages the Secretary of the Air Force to explore a holistic replacement approach and perform a cost benefit analysis that takes into account operational cost savings from a new, modern aircraft with a common logistics chain, and common training. The Committee believes that significant cost savings can be garnered by recapitalizing the fleet with a single, common platform. Communication, Navigation and Surveillance/Air Traffic Management [CNS/ATM].--In the fiscal year 2013 budget request, the Air Force proposes to terminate the C-130H Avionics Modernization Program [AMP] and begin a modification program that addresses mainly compliance with international navigation standards for flying in civil airspace, which is the most pressing upgrade for these airframes. While the Committee supports the Air Force's decision to pursue a less costly solution, the Committee is concerned that the requirements for a CNS/ATM solution for the C-130H aircraft are not final and that the requirements may grow to create another costly modernization program. The Committee encourages the Air Force to find an affordable CNS/ATM solution that ensures near-term modernization of the C-130H aircraft. Military Global Positioning System User Equipment.--The budget request contains $96,840,000 for continued development of Military Global Positioning System [GPS] User Equipment [MGUE]. The MGUE program is necessary to allow the armed forces to take advantage of new signals and other capabilities, such as substantially greater resistance to jamming of GPS signals, that are integrated on the latest generations of GPS satellites. The MGUE program is a follow-on to the Modernized User Equipment program begun in 2006, with three contractors performing risk-reduction activities. The budget request proposes to continue funding three contractors for technology development efforts while delaying a production decision until fiscal year 2017, as opposed to the previous plan to select the best two proposals for more advanced development activities. The Committee believes that delaying a down-select in contractors is not justified under the current fiscal environment. Investments in this important technology should be prioritized to the best performers in a competitive environment. Therefore, the Committee recommends a reduction of $20,000,000, which will sustain robust funding for continued development of the two most competitive proposals in fiscal year 2013. Space Modernization Initiative.--Last year, the Air Force initiated the Evolutionary Acquisition for Space Efficiency [EASE] strategy to stabilize the industrial base, manage cost, and increase capabilities for selected satellite programs. One facet of the program is to maintain a steady investment in capability insertion programs, now known as the Space Modernization Initiative [SMI], to upgrade performance while avoiding obsolescence and diminishing manufacturing sources. The fiscal year 2013 budget makes substantial reductions to SMI: from fiscal years 2013 through 2017, the budget request cuts SMI funding by more than $820,000,000 from the Advanced Extremely High Frequency [AEHF] program and more than $340,000,000 from the Space Based Infrared System [SBIRS]. While the fiscal constraints that led to reductions in SMI are well understood, the Committee believes that limiting investment in this area increases the risk that the government will be locked into old technologies, suppliers, and concepts. Therefore, the Committee recommends an increase of $30,000,000 for AEHF SMI, to be used for radiation hardened manufacturing, hosted payloads, ``design for affordability,'' and related efforts and an increase of $20,000,000 for SBIRS SMI, to be used for alternative overhead persistent infrared technologies, hosted payloads, ``design for affordability,'' and related efforts. The Committee directs the Secretary of the Air Force to provide the congressional defense committees with a report detailing how the additional SMI funds will be used not fewer than 30 days prior to the obligation of any of these funds. Transfer of Civilian Pay.--In fiscal year 2012, the Air Force requested, and Congress approved, the transfer of civilian pay for the Space and Missile Systems Center [SMC] from the operation and maintenance appropriation to the Research, Development, Test and Evaluation [RDT&E] appropriation. The Committee understands that the Air Force may be evaluating this transfer as a model for other organizations. The Committee directs the Government Accountability Office [GAO] to submit a report to the congressional defense committees on the impacts of transferring civilian salaries to the RDT&E appropriation. At a minimum, the report shall address the extent to which the use of RDT&E funds for SMC civilian pay provides advantages or disadvantages in the management of the civilian workforce, the adequacy of financial controls to insure that RDT&E funds intended for civilian pay are not transferred to other purposes, and any areas of efficiency or risk that future transfers may entail. The Secretary of the Air Force is directed not to transfer civilian pay for any organization with greater than 20 civilian billets from operation and maintenance to RDT&E funds until the GAO report is submitted to the congressional defense committees. The Secretary may waive this restriction upon certification to the congressional defense committees that such a transfer is necessary for the interests of national defense. Space Launch.--The Committee remains concerned about the rising costs of space launch and recognizes and supports the Department's efforts to certify New Entrant space launch providers to enable competition and reduce program costs. The Committee will continue to closely review the Department's upcoming acquisition of booster cores to ensure it enables competition and reduces costs. To meet these goals, the Committee reiterates its view expressed in Senate Report 112- 77, which accompanied the Senate-reported version of the Defense Appropriations Act, 2012, which urged the Department ``to retain flexibility with its block-buy acquisition strategy as opportunities for competition by new launch entrants become available.'' To achieve this flexibility, the Committee: (1) encourages the Department to provide the Committee within 90 days of enactment of this act with an estimated date by which one or more new entrants is expected to complete the new entrant certification process; and (2) encourages the department to see that any sole-source launch contract ensures that new entrants can fully compete for EELV missions once one or more new entrants complete the new entrant certification process. The Committee also directs the Secretary of the Air Force to provide a written report to the congressional defense committees within 90 days of enactment of this act that describes the launch missions, beyond the Deep Space Climate Observatory mission and the Space Test Program, which will be open for competition by certified new launch entrants. Space Launch System.--The Committee understands that National Aeronautics and Space Administration [NASA] is developing a Space Launch System with significantly greater lift capability than any rocket currently available on the world market, capable of carrying an extremely large fairing that could accommodate payloads of unprecedented weight and size. The Committee directs the Secretary of Defense, in consultation with the Director of the National Reconnaissance Office and the NASA Administrator, to provide a report to the congressional defense committee within 180 days of enactment of this act on the potential national security uses and associated launch costs of the Space Launch System. The study should address the utility of the system as currently envisioned, and any modifications or additions that would substantially increase that utility. The report shall be classified with an unclassified executive summary. Research, Development, Test and Evaluation, Defense-Wide Appropriations, 2012.................................... $19,193,955,000 Budget estimate, 2013................................... 17,982,161,000 House allowance......................................... 19,100,362,000 Committee recommendation................................ 18,419,129,000 The Committee recommends an appropriation of $18,419,129,000. This is $436,968,000 above the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [In thousands of dollars] -------------------------------------------------------------------------------------------------------------------------------------------------------- Change from 2013 budget House Committee ------------------------------- Item estimate allowance recommendation Budget House estimate allowance -------------------------------------------------------------------------------------------------------------------------------------------------------- RESEARCH, DEVELOPMENT, TEST & EVAL, DEFENSE-WIDE BASIC RESEARCH DTRA UNIVERSITY STRATEGIC PARTNERSHIP BASIC RESEARCH 45,071 45,071 45,071 .............. .............. DEFENSE RESEARCH SCIENCES 309,051 309,051 309,051 .............. .............. BASIC RESEARCH INITIATIVES 19,405 15,005 19,405 .............. +4,400 BASIC OPERATIONAL MEDICAL RESEARCH SCIENCE 39,676 39,676 39,676 .............. .............. NATIONAL DEFENSE EDUCATION PROGRAM 87,979 87,979 87,979 .............. .............. CHEMICAL AND BIOLOGICAL DEFENSE PROGRAM 50,566 50,566 50,566 .............. .............. --------------------------------------------------------------------------------- TOTAL, BASIC RESEARCH 551,748 547,348 551,748 .............. +4,400 APPLIED RESEARCH JOINT MUNITIONS TECHNOLOGY 20,615 20,615 20,615 .............. .............. BIOMEDICAL TECHNOLOGY 110,900 110,900 100,900 -10,000 -10,000 HISTORICALLY BLACK COLLEGES & UNIV [HBCU] .............. 35,599 .............. .............. -35,599 LINCOLN LABORATORY RESEARCH PROGRAM 36,826 36,826 36,826 .............. .............. SYSTEMS 2020 APPLIED RESEARCH 7,898 .............. 7,898 .............. +7,898 INFORMATION AND COMMUNICATIONS TECHNOLOGY 392,421 402,421 372,421 -20,000 -30,000 COGNITIVE COMPUTING SYSTEMS 30,424 30,424 30,424 .............. .............. BIOLOGICAL WARFARE DEFENSE 19,236 19,236 19,236 .............. .............. CHEMICAL AND BIOLOGICAL DEFENSE PROGRAM 223,269 223,269 223,269 .............. .............. JOINT DATA MANAGEMENT ADVANCED DEVELOPMENT 13,753 8,753 9,753 -4,000 +1,000 CYBER SECURITY RESEARCH 18,985 11,485 12,985 -6,000 +1,500 HUMAN, SOCIAL AND CULTURE BEHAVIOR MODELING [HSCB] APP 6,771 6,771 6,771 .............. .............. TACTICAL TECHNOLOGY 233,209 233,209 218,209 -15,000 -15,000 MATERIALS AND BIOLOGICAL TECHNOLOGY 166,067 166,067 176,067 +10,000 +10,000 ELECTRONICS TECHNOLOGY 222,416 222,416 214,416 -8,000 -8,000 WEAPONS OF MASS DESTRUCTION DEFEAT TECHNOLOGIES 172,352 172,352 172,352 .............. .............. SPECIAL OPERATIONS TECHNOLOGY DEVELOPMENT 28,739 28,739 41,591 +12,852 +12,852 --------------------------------------------------------------------------------- TOTAL, APPLIED RESEARCH 1,703,881 1,729,082 1,663,733 -40,148 -65,349 ADVANCED TECHNOLOGY DEVELOPMENT JOINT MUNITIONS ADVANCED TECH INSENSITIVE MUNITIONS AD 25,612 20,012 21,612 -4,000 +1,600 SO/LIC ADVANCED DEVELOPMENT 26,324 26,324 26,324 .............. .............. COMBATING TERRORISM TECHNOLOGY SUPPORT 77,144 77,144 127,144 +50,000 +50,000 COUNTERPROLIFERATION INITIATIVES--PROLIF PREV & DEFEAT 275,022 275,022 275,022 .............. .............. BALLISTIC MISSILE DEFENSE TECHNOLOGY 79,975 75,975 79,975 .............. +4,000 JOINT DOD-DOE MUNITIONS TECHNOLOGY DEVELOPMENT 20,032 20,032 20,032 .............. .............. AGILE TRANSPO FOR THE 21ST CENTURY [AT21]--THEATER CA 3,892 3,892 3,892 .............. .............. SPECIAL PROGRAM--MDA TECHNOLOGY 36,685 36,685 36,685 .............. .............. ADVANCED AEROSPACE SYSTEMS 174,316 174,316 166,816 -7,500 -7,500 SPACE PROGRAMS AND TECHNOLOGY 159,704 159,704 159,704 .............. .............. CHEMICAL AND BIOLOGICAL DEFENSE PROGRAM--ADVANCED DEV 234,280 234,280 234,280 .............. .............. JOINT ELECTRONIC ADVANCED TECHNOLOGY 6,983 6,983 6,983 .............. .............. JOINT CAPABILITY TECHNOLOGY DEMONSTRATIONS 158,263 158,263 158,263 .............. .............. NETWORKED COMMUNICATIONS CAPABILITIES 25,393 25,393 25,393 .............. .............. DATA TO DECISIONS ADVANCED TECHNOLOGY 13,754 8,754 9,754 -4,000 +1,000 CYBER SECURITY ADVANCED RESEARCH 19,935 12,435 13,935 -6,000 +1,500 HUMAN, SOCIAL AND CULTURE BEHAVIOR MODELING [HSCB] ADV 8,235 8,235 8,235 .............. .............. DEFENSE-WIDE MANUFACTURING SCIENCE AND TECHNOLOGY PROG 21,966 21,966 51,966 +30,000 +30,000 EMERGING CAPABILITIES TECHNOLOGY DEVELOPMENT 24,662 24,662 24,662 .............. .............. GENERIC LOGISTICS R&D TECHNOLOGY DEMONSTRATIONS 24,605 24,605 24,605 .............. .............. DEPLOYMENT AND DISTRIBUTION ENTERPRISE TECHNOLOGY 30,678 30,678 30,678 .............. .............. STRATEGIC ENVIRONMENTAL RESEARCH PROGRAM 65,282 65,282 65,282 .............. .............. MICROELECTRONIC TECHNOLOGY DEVELOPMENT AND SUPPORT 72,234 62,234 62,234 -10,000 .............. JOINT WARFIGHTING PROGRAM 8,403 8,403 8,403 .............. .............. ADVANCED ELECTRONICS TECHNOLOGIES 111,008 111,008 111,008 .............. .............. COMMAND, CONTROL AND COMMUNICATIONS SYSTEMS 237,859 237,859 229,859 -8,000 -8,000 CLASSIFIED DARPA PROGRAMS 3,000 3,000 3,000 .............. .............. NETWORK-CENTRIC WARFARE TECHNOLOGY 236,883 236,883 239,383 +2,500 +2,500 SENSOR TECHNOLOGY 299,438 299,438 289,438 -10,000 -10,000 5DEFENSE RAPID INNOVATION PROGRAM .............. 250,000 200,000 +200,000 -50,000 DISTRIBUTED LEARNING ADVANCED TECHNOLOGY DEVELOPMENT 12,195 12,195 12,195 .............. .............. SOFTWARE ENGINEERING INSTITUTE 30,036 30,036 30,036 .............. .............. QUICK REACTION SPECIAL PROJECTS 107,002 82,002 92,002 -15,000 +10,000 JOINT EXPERIMENTATION 21,230 21,230 21,230 .............. .............. MODELING AND SIMULATION MANAGEMENT OFFICE 47,433 47,433 43,433 -4,000 -4,000 DIRECTED ENERGY RESEARCH 46,944 41,944 2,384 -44,560 -39,560 NEXT GENERATION AEGIS MISSILE 224,077 204,077 54,877 -169,200 -149,200 TEST & EVALUATION SCIENCE & TECHNOLOGY 92,602 92,602 92,602 .............. .............. OPERATIONAL ENERGY CAPABILITY IMPROVEMENT 26,244 26,244 26,244 .............. .............. CWMD SYSTEMS 53,946 23,946 38,946 -15,000 +15,000 SPECIAL OPERATIONS ADVANCED TECHNOLOGY DEVELOPMENT 45,317 45,317 45,317 .............. .............. AVIATION ENGINEERING ANALYSIS 861 861 861 .............. .............. SOF INFORMATION AND BROADCAST SYSTEMS ADVANCED TECH 4,959 4,959 4,959 .............. .............. --------------------------------------------------------------------------------- TOTAL, ADVANCED TECHNOLOGY DEVELOPMENT 3,194,413 3,332,313 3,179,653 -14,760 -152,660 DEMONSTRATION & VALIDATION NUCLEAR AND CONVENTIONAL PHYSICAL SECURITY EQUIPMENT 33,234 33,234 33,234 .............. .............. RETRACT LARCH 21,023 21,023 21,023 .............. .............. WALKOFF 94,624 94,624 94,624 .............. .............. ADVANCE SENSOR APPLICATIONS PROGRAM 16,958 16,958 18,958 +2,000 +2,000 ENVIRONMENTAL SECURITY TECHNICAL CERTIFICATION PROGRAM 75,941 75,941 75,941 .............. .............. BALLISTIC MISSILE DEFENSE TERMINAL DEFENSE SEGMENT 316,929 296,929 316,929 .............. +20,000 BALLISTIC MISSILE DEFENSE MIDCOURSE DEFENSE SEGMENT 903,172 978,172 903,172 .............. -75,000 CHEMICAL AND BIOLOGICAL DEFENSE PROGRAM 179,023 179,023 179,023 .............. .............. BALLISTIC MISSILE DEFENSE SENSORS 347,012 347,012 347,012 .............. .............. BALLISTIC MISSILE DEFENSE ENABLING PROGRAMS 362,711 362,711 362,711 .............. .............. SPECIAL PROGRAMS--MDA 272,387 272,387 258,787 -13,600 -13,600 AEGIS BMD 992,407 992,407 992,407 .............. .............. SPACE SURVEILLANCE & TRACKING SYSTEM 51,313 51,313 51,313 .............. .............. BALLISTIC MISSILE DEFENSE SYSTEM SPACE PROGRAMS 6,912 6,912 6,912 .............. .............. BALLISTIC MISSILE DEFENSE C2BMC 366,552 341,552 366,552 .............. +25,000 BALLISTIC MISSILE DEFENSE JOINT WARFIGHTER SUPPORT 55,550 55,550 55,550 .............. .............. BALLISTIC MISSILE DEFENSE INTERGRATION AND OPERATIONS CENTER 63,043 63,043 63,043 .............. .............. [MDIOC] REGARDING TRENCH 11,371 11,371 11,371 .............. .............. SEA BASED X-BAND RADAR [SBX] 9,730 9,730 29,730 +20,000 +20,000 ISRAELI COOPERATIVE PROGRAMS 99,836 948,736 268,736 +168,900 -680,000 BALLISTIC MISSILE DEFENSE TEST 454,400 454,400 454,400 .............. .............. BALLISTIC MISSILE DEFENSE TARGETS 435,747 435,747 435,747 .............. .............. HUMANITARIAN DEMINING 13,231 13,231 13,231 .............. .............. COALITION WARFARE 11,398 11,398 11,398 .............. .............. DEPARTMENT OF DEFENSE CORROSION PROGRAM 3,283 3,283 33,283 +30,000 +30,000 DOD UNMANNED AIRCRAFT SYSTEM [UAS] COMMON DEVELOPMENT. 12,368 12,368 12,368 .............. .............. HUMAN, SOCIAL AND CULTURE BEHAVIOR MODELING [HSCB] RES 5,131 5,131 5,131 .............. .............. JOINT SYSTEMS INTEGRATION 3,273 3,273 3,273 .............. .............. JOINT FIRES INTEGRATION & INTEROPERABILITY TEAM 7,364 7,364 7,364 .............. .............. LAND-BASED SM-3 [LBSM3] 276,338 266,338 276,338 .............. +10,000 AEGIS SM-3 BLOCK IIA CO-DEVELOPMENT 420,630 420,630 470,630 +50,000 +50,000 PRECISION TRACKING SPACE SYSTEM RDT&E 297,375 242,375 297,375 .............. +55,000 ADVANCED REMOTE SENSOR TECHNOLOGY [ARST] 58,742 33,742 2,982 -55,760 -30,760 JOINT ELECTROMAGNETIC TECHNOLOGY [JET] PROGRAM 3,158 3,158 3,158 .............. .............. NUCLEAR AND CONVENTIONAL PHYSICAL SECURITY EQUIPMENT 6,817 6,817 6,817 .............. .............. PROMPT GLOBAL STRIKE CAPABILITY DEVELOPMENT 110,383 110,383 200,383 +90,000 +90,000 --------------------------------------------------------------------------------- TOTAL, DEMONSTRATION & VALIDATION 6,399,366 7,188,266 6,690,906 +291,540 -497,360 ENGINEERING & MANUFACTURING DEVELOPMENT CHEMICAL AND BIOLOGICAL DEFENSE PROGRAM 311,071 311,071 311,071 .............. .............. ADVANCED IT SERVICES JOINT PROGRAM OFFICE [AITS-JPO] 25,787 25,787 25,787 .............. .............. JOINT TACTICAL INFORMATION DISTRIBUTION SYSTEM [JTIDS] 20,688 20,688 20,688 .............. .............. WEAPONS OF MASS DESTRUCTION DEFEAT CAPABILITIES 5,749 5,749 5,749 .............. .............. INFORMATION TECHNOLOGY DEVELOPMENT 12,699 12,699 12,699 .............. .............. HOMELAND PERSONNEL SECURITY INITIATIVE 387 387 387 .............. .............. DEFENSE EXPORTABILITY PROGRAM 1,859 1,859 1,859 .............. .............. OUSD(C) IT DEVELOPMENT INITIATIVES 7,010 7,010 7,010 .............. .............. DOD ENTERPRISE SYSTEMS DEVELOPMENT AND DEMONSTRATION 133,104 64,104 133,104 .............. +69,000 DCMO POLICY AND INTEGRATION 25,269 25,269 25,269 .............. .............. DEFENSE-WIDE ELECTRONIC PROCUREMENT CAPABILITY 10,238 10,238 10,238 .............. .............. GLOBAL COMBAT SUPPORT SYSTEM 19,670 19,670 19,670 .............. .............. DOD ENTERPRISE ENERGY INFORMATION MANAGEMENT [EEIM] 3,556 3,556 3,556 .............. .............. --------------------------------------------------------------------------------- TOTAL, ENGINEERING & MANUFACTURING DEVELOPMENT 577,087 508,087 577,087 .............. +69,000 RDT&E MANAGEMENT SUPPORT DEFENSE READINESS REPORTING SYSTEM [DRRS] 6,383 6,383 6,383 .............. .............. JOINT SYSTEMS ARCHITECTURE DEVELOPMENT 3,845 3,845 3,845 .............. .............. CENTRAL TEST AND EVALUATION INVESTMENT DEVELOPMENT 144,109 144,109 156,109 +12,000 +12,000 ASSESSMENTS AND EVALUATIONS 2,419 2,419 2,419 .............. .............. THERMAL VICAR 8,214 8,214 8,214 .............. .............. JOINT MISSION ENVIRONMENT TEST CAPABILITY [JMETC] 19,380 19,380 19,380 .............. .............. TECHNICAL STUDIES, SUPPORT AND ANALYSIS 32,266 32,266 32,266 .............. .............. USD(A&T)--CRITICAL TECHNOLOGY SUPPORT 840 840 840 .............. .............. FOREIGN MATERIAL ACQUISITION AND EXPLOITATION 56,012 56,012 56,012 .............. .............. JOINT THEATER AIR AND MISSILE DEFENSE ORGANIZATION 55,508 55,508 55,508 .............. .............. CLASSIFIED PROGRAM USD(P) .............. 100,000 100,000 +100,000 .............. FOREIGN COMPARATIVE TESTING 18,174 18,174 18,174 .............. .............. SYSTEMS ENGINEERING 43,195 43,195 43,195 .............. .............. STUDIES AND ANALYSIS SUPPORT 6,457 6,457 6,457 .............. .............. NUCLEAR MATTERS--PHYSICAL SECURITY 4,901 4,901 4,901 .............. .............. SUPPORT TO NETWORKS AND INFORMATION INTEGRATION 6,307 6,307 6,307 .............. .............. GENERAL SUPPORT TO USD (INTELLIGENCE) 6,601 6,601 16,601 +10,000 +10,000 DEFENSE-WIDE ELECTRONIC PROCUREMENT .............. 20,000 .............. .............. -20,000 CHEMICAL AND BIOLOGICAL DEFENSE PROGRAM 92,849 92,849 92,849 .............. .............. SMALL BUSINESS INNOVATION RESEARCH/CHALLENGE ADMINISTR 1,857 1,857 1,857 .............. .............. DEFENSE TECHNOLOGY ANALYSIS 12,056 12,056 12,056 .............. .............. DEFENSE TECHNICAL INFORMATION CENTER [DTIC] 55,454 55,454 55,454 .............. .............. R&D IN SUPPORT OF DOD ENLISTMENT, TESTING & EVALUATION 16,364 16,364 16,364 .............. .............. DEVELOPMENT TEST AND EVALUATION 15,110 15,110 20,110 +5,000 +5,000 MANAGEMENT HEADQUARTERS (RESEARCH & DEVELOPMENT) 69,767 69,767 69,767 .............. .............. BUDGET AND PROGRAM ASSESSMENTS 4,454 4,454 4,454 .............. .............. OPERATIONS SECURITY [OPSEC] 2,637 2,637 2,637 .............. .............. SUPPORT TO INFORMATION OPERATIONS [IO] CAPABILITIES 8,238 8,238 8,238 .............. .............. CYBER SECURITY INITIATIVE 1,801 1,801 1,801 .............. .............. INTELLIGENCE SUPPORT TO INFORMATION OPERATIONS [IO] 16,041 16,041 16,041 .............. .............. COCOM EXERCISE ENGAGEMENT AND TRAINING TRANSFORMATION 77,475 57,475 77,475 .............. +20,000 MANAGEMENT HEADQUARTERS--MDA 34,855 34,855 34,855 .............. .............. IT SOFTWARE DEV INITIATIVES 104 104 104 .............. .............. CLASSIFIED PROGRAMS 64,255 64,255 64,255 .............. .............. --------------------------------------------------------------------------------- TOTAL, RDT&E MANAGEMENT SUPPORT 887,928 987,928 1,014,928 +127,000 +27,000 OPERATIONAL SYSTEMS DEVELOPMENT ENTERPRISE SECURITY SYSTEM [ESS] 8,866 8,866 8,866 .............. .............. REGIONAL INTERNATIONAL OUTREACH & PARTNERSHIP FOR PEAC 3,238 3,238 3,238 .............. .............. OVERSEAS HUMANITARIAN ASSISTANCE SHARED INFORMATION SY 288 288 288 .............. .............. CHEMICAL AND BIOLOGICAL DEFENSE (OPERATIONAL SYSTEMS D 14,745 14,745 14,745 .............. .............. JOINT INTEGRATION AND INTEROPERABILITY 5,013 5,013 5,013 .............. .............. PLANNING AND DECISION AID SYSTEM 3,922 3,922 3,922 .............. .............. C4I INTEROPERABILITY 72,574 72,574 72,574 .............. .............. JOINT/ALLIED COALITION INFORMATION SHARING 6,214 6,214 6,214 .............. .............. NATIONAL MILITARY COMMAND SYSTEM-WIDE SUPPORT 499 499 499 .............. .............. DEFENSE INFO INFRASTRUCTURE ENGINEERING & INTEGRATION 14,498 14,498 14,498 .............. .............. LONG HAUL COMMUNICATIONS (DCS) 26,164 26,164 26,164 .............. .............. MINIMUM ESSENTIAL EMERGENCY COMMUNICATIONS NETWORK 12,931 12,931 12,931 .............. .............. PUBLIC KEY INFRASTRUCTURE [PKI] 6,296 6,296 6,296 .............. .............. KEY MANAGEMENT INFRASTRUCTURE [KMI] 30,948 30,948 30,948 .............. .............. INFORMATION SYSTEMS SECURITY PROGRAM 11,780 11,780 11,780 .............. .............. INFORMATION SYSTEMS SECURITY PROGRAM 191,452 191,452 191,452 .............. .............. GLOBAL COMMAND AND CONTROL SYSTEM 36,575 36,575 36,575 .............. .............. JOINT SPECTRUM CENTER 24,278 24,278 24,278 .............. .............. NET-CENTRIC ENTERPRISE SERVICES [NCES] 2,924 2,924 2,924 .............. .............. JOINT MILITARY DECEPTION INITIATIVE 1,294 1,294 1,294 .............. .............. TELEPORT PROGRAM 6,050 6,050 6,050 .............. .............. SPECIAL APPLICATIONS FOR CONTINGENCIES 17,058 17,058 17,058 .............. .............. CYBER SECURITY INITIATIVE 4,189 4,189 4,189 .............. .............. CRITICAL INFRASTRUCTURE PROTECTION [CIP] 10,462 10,462 10,462 .............. .............. POLICY R&D PROGRAMS 6,360 6,360 6,360 .............. .............. NET CENTRICITY 21,190 21,190 21,190 .............. .............. DISTRIBUTED COMMON GROUND/SURFACE SYSTEMS 7,114 7,714 7,114 .............. -600 DISTRIBUTED COMMON GROUND/SURFACE SYSTEMS 3,247 3,247 3,247 .............. .............. MQ-1 PREDATOR A UAV 1,355 1,355 1,355 .............. .............. HOMELAND DEFENSE TECHNOLOGY TRANSFER PROGRAM 2,303 2,303 2,303 .............. .............. INT'L INTELLIGENCE TECHNOLOGY ASSESSMENT, ADVANCEMENT 1,478 1,478 1,478 .............. .............. INDUSTRIAL PREPAREDNESS 27,044 27,044 27,044 .............. .............. LOGISTICS SUPPORT ACTIVITIES 4,711 4,711 4,711 .............. .............. MANAGEMENT HEADQUARTERS (JCS) 4,100 4,100 4,100 .............. .............. MQ-9 UAV 3,002 3,002 3,002 .............. .............. SPECIAL OPERATIONS AVIATION SYSTEMS ADVANCED DEV 97,267 97,267 97,267 .............. .............. SPECIAL OPERATIONS TACTICAL SYSTEMS DEVELOPMENT 821 821 821 .............. .............. SPECIAL OPERATIONS INTELLIGENCE SYSTEMS DEVELOPMENT 25,935 25,935 25,935 .............. .............. SOF OPERATIONAL ENHANCEMENTS 51,700 65,700 47,700 -4,000 -18,000 SPECIAL OPERATIONS CV-22 DEVELOPMENT 1,822 1,822 1,822 .............. .............. MISSION TRAINING AND PREPARATION SYSTEMS [MTPS] 10,131 10,131 8,807 -1,324 -1,324 MC130J SOF TANKER RECAPITALIZATION 19,647 19,647 19,647 .............. .............. SOF COMMUNICATIONS EQUIPMENT AND ELECTRONICS SYSTEMS 2,225 2,225 2,225 .............. .............. SOF TACTICAL RADIO SYSTEMS 3,036 3,036 3,036 .............. .............. SOF WEAPONS SYSTEMS 1,511 1,511 1,511 .............. .............. SOF SOLDIER PROTECTION AND SURVIVAL SYSTEMS 4,263 4,263 4,263 .............. .............. SOF VISUAL AUGMENTATION, LASERS & SENSOR SYSTEMS 4,448 4,448 4,448 .............. .............. SOF TACTICAL VEHICLES 11,325 11,325 11,325 .............. .............. SOF MUNITIONS 1,515 1,515 1,515 .............. .............. SOF ROTARY WING AVIATION 24,430 24,430 20,430 -4,000 -4,000 SOF UNDERWATER SYSTEMS 26,405 61,405 34,405 +8,000 -27,000 SOF SURFACE CRAFT 8,573 8,573 8,573 .............. .............. SOF GLOBAL VIDEO SURVEILLANCE ACTIVITIES 7,620 7,620 7,620 .............. .............. SOF OPERATIONAL ENHANCEMENTS INTELLIGENCE 16,386 16,386 13,386 -3,000 -3,000 --------------------------------------------------------------------------------- TOTAL, OPERATIONAL SYSTEMS DEVELOPMENT 913,222 962,822 908,898 -4,324 -53,924 DARPA CLASSIFIED .............. .............. -25,000 -25,000 -25,000 CLASSIFIED PROGRAMS 3,754,516 3,844,516 3,857,176 +102,660 +12,660 --------------------------------------------------------------------------------- TOTAL, RESEARCH, DEVELOPMENT, TEST & EVAL, DEF-WIDE 17,982,161 19,100,362 18,419,129 +436,968 -681,233 -------------------------------------------------------------------------------------------------------------------------------------------------------- COMMITTEE RECOMMENDED ADJUSTMENTS The following table details the adjustments recommended by the Committee: [In thousands of dollars] ---------------------------------------------------------------------------------------------------------------- Change from Line Item 2013 budget Committee budget estimate recommendation estimate ---------------------------------------------------------------------------------------------------------------- 8 Biomedical Technology 110,900 100,900 -10,000 Reduction to new starts .............. .............. -10,000 12 Information and Communications Technology 392,421 372,421 -20,000 Excessive prior year funds .............. .............. -10,000 Reduction in program growth .............. .............. -10,000 17 Data to Decisions Applied Research 13,753 9,753 -4,000 Unexecutable growth .............. .............. -4,000 18 Cyber Security Research 18,985 12,985 -6,000 Excessive growth .............. .............. -6,000 20 Tactical Technology 233,209 218,209 -15,000 Reduction in program growth .............. .............. -15,000 21 Materials and Biological Technology 166,067 176,067 +10,000 Technology Transfer .............. .............. +10,000 22 Electronics Technology 222,416 214,416 -8,000 Reduction in program growth .............. .............. -8,000 24 Special Operations Technology Development 28,739 41,591 +12,852 Sensor development--restore unjustified reduction .............. .............. +12,852 25 Joint Munitions Advanced Technology 25,612 21,612 -4,000 Excessive growth .............. .............. -4,000 27 Combating Terrorism Technology Support 77,144 127,144 +50,000 Program increase .............. .............. +50,000 34 Advanced Aerospace Systems 174,316 166,816 -7,500 Reduction in program growth .............. .............. -15,000 Technology Transfer and Transition .............. .............. +7,500 40 Data to Decisions Advanced Technology Development 13,754 9,754 -4,000 Excessive growth .............. .............. -4,000 42 Cyber Security Advanced Research 19,935 13,935 -6,000 OSD identified excess need .............. .............. -6,000 44 Defense-Wide Manufacturing Science and Technology Program 21,966 51,966 +30,000 Authorization increase .............. .............. +30,000 50 Microelectronics Technology Development and Support 72,234 62,234 -10,000 90nm Next Generation Foundry--early to need .............. .............. -10,000 54 Command, Control and Communications Systems 237,859 229,859 -8,000 Reduction to new starts .............. .............. -8,000 56 Network-Centric Warfare Technology 236,883 239,383 +2,500 Reduction in program growth .............. .............. -5,000 Technology Transfer and Transition .............. .............. +7,500 57 Sensor Technology 299,438 289,438 -10,000 Reduction to new starts .............. .............. -10,000 57X Defense Rapid Innovation Fund .............. 200,000 +200,000 X Authorization increase .............. .............. +200,000 60 Quick Reaction Special Projects 107,002 92,002 -15,000 Excessive growth .............. .............. -15,000 63 DOD Modeling and Simulation Management Office 47,433 43,433 -4,000 Reduction to new starts .............. .............. -4,000 64 Directed Energy Research 46,944 2,384 -44,560 Program adjustment .............. .............. -44,560 65 Next Generation Aegis Missile 224,077 54,877 -169,200 MD70: Transfer to SM-3 IIA for test and development .............. .............. -162,700 risk reduction MD40: Excessive growth .............. .............. -6,500 69 CWMD Systems 53,946 38,946 -15,000 Unexecutable growth .............. .............. -15,000 77 Advanced Sensor Applications Program 16,958 18,958 +2,000 Authorization increase .............. .............. +2,000 85 Special Programs--MDA 272,387 258,787 -13,600 Program adjustment .............. .............. -13,600 93 Sea Based X-Band Radar [SBX] 9,730 29,730 +20,000 SBX software sustainment--unjustified reduction .............. .............. +20,000 94 Israeli Cooperative Programs 99,836 268,736 +168,900 Arrow 3 Upper Tier Interceptor Program .............. .............. +23,800 Arrow System Improvement Program .............. .............. +33,700 David's Sling Weapon Program .............. .............. +111,400 99 Department of Defense Corrosion Program 3,283 33,283 +30,000 Authorization increase .............. .............. +30,000 108 AEGIS SM-3 Block IIA Co-Development 420,630 470,630 +50,000 Transfer from line 65 for test development risk reduc- .............. .............. +50,000 tion 111 Advanced Remote Sensor Technology [ARST] 58,742 2,982 -55,760 Lack of acquisition strategy .............. .............. -55,760 116 Prompt Global Strike Capability Development 110,383 200,383 +90,000 For Advanced Hypersonic Weapon .............. .............. +90,000 137 Central Test and Evaluation Investment Development 144,109 156,109 +12,000 [CTEIP] Restore unjustified reduction .............. .............. +12,000 145 Classified Program USD(P) .............. 100,000 +100,000 Classified Program USD(P) .............. .............. +100,000 151 General Support to USD (Intelligence) 6,601 16,601 +10,000 Irregular Warfare Resource Intelligence Program for .............. .............. +10,000 Emerging Technologies Collection, Exploitation and Research 164 Development Test and Evaluation 15,110 20,110 +5,000 Authorization increase .............. .............. +5,000 260 SOF Operational Enhancements 51,700 47,700 -4,000 Excess prior year funds .............. .............. -4,000 262 Mission Training and Preparation Systems [MTPS] 10,131 8,807 -1,324 SOCOM requested transfer to Defense-Wide line 78 .............. .............. -1,324 271 SOF Rotary Wing Aviation 24,430 20,430 -4,000 Excess of prior year funds .............. .............. -4,000 272 SOF Underwater Systems 26,405 34,405 +8,000 SOCOM requested transfer from Defense-Wide line 64 .............. .............. +8,000 276 SOF Operational Enhancements Intelligence 16,386 13,386 -3,000 Excess of prior year funds .............. .............. -3,000 999 Classified Programs 3,754,516 3,832,176 +102,660 Classified Adjustment .............. .............. +102,660 DARPA--Authorization adjustment for unjustified special .............. .............. -25,000 access programs ---------------------------------------------------------------------------------------------------------------- Conventional Prompt Global Strike.--The fiscal year 2013 budget request includes $110,383,000 to continue the Prompt Global Strike program, a decrease from $174,830,000 in fiscal year 2012. The Committee recognizes the significance of the research and development of hypersonic technology for employment in a conventional prompt global strike weapon and notes the United States Army Space and Missile Defense Command/ Army Forces Strategic Command's successful intermediate range test flight of the Advanced Hypersonic Weapon [AHW] conducted on November 17, 2011. The Army's successful flight test followed two failed test flights of the Defense Advanced Research Project Agency's Hypersonic Test Vehicle-2 [HTV-2]. The Committee also understands the Department of Defense plans to develop a new hypersonic vehicle design which includes the development of a new booster and payload delivery vehicle. Considering the recent test outcomes and the fiscal constraints under which the Department is operating, the Committee believes the Department should focus efforts and resources on the initiative that achieved its flight test and data collection expectations. Therefore, the Committee recommends an increase of $90,000,000 to continue planning for and completing a second, longer range flight test of AHW. The Committee also directs that no funds are to be used for design or development efforts which are intended to support a significant departure from HTV-2 or AHW payload delivery vehicle designs. Data to Decisions Initiative.--The Committee supports the goals for the Data to Decisions Initiative but notes there is duplication with similar research on mission-driven data analysis and information management research funded by the Air Force and other services. The Committee provides a total of $9,700,000 and encourages the program to incorporate data quality research supported by the Air Force Research Lab for managing large data sets resulting from persistent surveillance. Software Coding.--The Committee encourages the Department of Defense to accelerate efforts under way to conduct secure software coding experiments and data analysis to determine which secure coding guidelines are practiced and effective and to develop a template for scalable cyber modeling and simulation. These experiments could improve the understanding of the cyber threat and mitigation of the threat, increase the military's ability to fight and survive during cyber attacks, measure the state of cyber security, and explore and exploit new ideas in cyber warfare. Unmanned Aerial System Common Development.--The Committee notes the passage of recent legislation directing the Federal Aviation Administration [FAA] to assess the suitability of integrating unmanned aerial systems [UAS] into the national airspace through the establishment of test ranges for civil use. The Committee recognizes that the FAA managed test ranges will lead to policies and standards governing future domestic UAS operations, including Department of Defense [DOD] operations. The Committee fully funds the request for Unmanned Aerial System Common Development and expects DOD to share the benefit of their UAS research, testing and experience with the FAA and NASA to support the FAA's development and demonstration of common UAS standards, architecture and technologies to ensure a consistent, nationwide approach to airspace integration. MISSILE DEFENSE AGENCY Sea-Based X-Band Radar [SBX].--The fiscal year 2013 budget request includes no funds to develop and sustain the software necessary to maintain SBX operational capability for ballistic missile defense. The Committee has been informed by the Missile Defense Agency that while SBX will be placed in a limited test support status in fiscal year 2013, SBX remains a critical element of ballistic missile defense and is intended for recall to active operational status as needed, as was demonstrated when North Korea attempted to launch a satellite earlier this year. Therefore, the Committee does not believe it is prudent to neglect software development sustainment and recommends an additional $20,000,000 in Research, Development, Test and Evaluation, Defense-Wide only for SBX software development and sustainment. Justification of Classified Programs.--The Committee notes the poor briefing materials in support of classified programs despite requests made by the Committee for the inclusion of specific information. Therefore, the Committee does not believe that the budget request for these programs was fully and appropriately justified and recommends an undistributed reduction of $13,600,000. The Director of the Missile Defense Agency is directed to submit a list of classified projects against which this reduction is levied not later than 90 days after enactment of this act. Directed Energy.--The fiscal year 2013 budget request includes $44,560,000 for a new Directed Energy Research program following the termination of the Airborne Laser Test Bed [ALTB]. The Committee notes that there are currently no less than five separate directed energy science and technology programs ongoing in the Department of Defense, none of which have clearly defined and funded transition plans into programs of record. In addition, the Committee understands that the Missile Defense Agency intends to award a noncompetitive, sole- source contract for integration of the yet-to-be-developed directed energy capability onto a high altitude long endurance platform that itself is currently under development. The Committee questions both the operational relevance of this scientific program, as well as the overall acquisition strategy during times of fiscal constraint. Therefore, the Committee recommends no funding for the Directed Energy program. Advanced Remote Sensor Technology [ARST].--The fiscal year 2013 budget request includes $55,760,000 for ARST, a fiscal year 2013 new start initiative. The Committee notes the lack of an acquisition strategy and recommends no funding for this program. Airborne Weapons Layer [AWL].--The Committee notes that the Air Force and MDA failed to submit the AWL cost benefit analysis [CBA] to the congressional defense committees with the fiscal year 2013 budget submission. The Committee understands that the analysis is partially complete. Therefore, the Committee directs the Secretary of the Air Force and the Director of the Missile Defense Agency to brief the congressional defense committees not later than 90 days after enactment of this act on their findings to date. Operational Test and Evaluation, Defense Appropriations, 2012.................................... $191,292,000 Budget estimate, 2013................................... 185,268,000 House allowance......................................... 185,268,000 Committee recommendation................................ 223,768,000 The Committee recommends an appropriation of $223,768,000. This is $38,500,000 above the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [In thousands of dollars] -------------------------------------------------------------------------------------------------------------------------------------------------------- Change from 2013 budget House Committee ------------------------------- Item estimate allowance recommendation Budget House estimate allowance -------------------------------------------------------------------------------------------------------------------------------------------------------- OPERATIONAL TEST AND EVALUATION, DEFENSE RDT&E MANAGEMENT SUPPORT OPERATIONAL TEST AND EVALUATION 72,501 72,501 91,501 +19,000 +19,000 LIVE FIRE TESTING 49,201 49,201 49,201 .............. .............. OPERATIONAL TEST ACTIVITIES AND ANALYSES 63,566 63,566 83,066 +19,500 +19,500 --------------------------------------------------------------------------------- TOTAL, RDT&E MANAGEMENT SUPPORT 185,268 185,268 223,768 +38,500 +38,500 --------------------------------------------------------------------------------- TOTAL, OPERATIONAL TEST AND EVALUATION, DEFENSE 185,268 185,268 223,768 +38,500 +38,500 -------------------------------------------------------------------------------------------------------------------------------------------------------- COMMITTEE RECOMMENDED ADJUSTMENTS The following table details the adjustments recommended by the Committee: [In thousands of dollars] ---------------------------------------------------------------------------------------------------------------- Change from Line Item 2013 budget Committee budget estimate recommendation estimate ---------------------------------------------------------------------------------------------------------------- 1 Operational Test and Evaluation 72,501 91,501 +19,000 National cyber range shortfall .............. .............. +4,000 Cyber testing shortfall .............. .............. +15,000 3 Operational Test Activities and Analyses 63,566 83,066 +19,500 Restore unjustified reductions .............. .............. +19,500 ---------------------------------------------------------------------------------------------------------------- Cyber Assessment Enhancements.--The fiscal year 2013 budget request includes funds to enhance cyber assessment and training and mission rehearsal capabilities under the auspices of the Director, Operational Test and Evaluation. The Committee is aware of additional unfunded requirements and recommends an increase of $19,000,000 in fiscal year 2013 to fund improvements necessary for the development and evaluation of offensive and defensive cyber-warfighting capabilities in representative cyber-threat environments. The Committee notes that these enhancements will improve the cyber environment infrastructure and threat portrayal and allow for increased cyber assessments during exercises. TITLE V REVOLVING AND MANAGEMENT FUNDS Defense Working Capital Funds Appropriations, 2012.................................... $1,575,010,000 Budget estimate, 2013................................... 1,516,184,000 House allowance......................................... 1,516,184,000 Committee recommendation................................ 1,516,184,000 The Committee recommends an appropriation of $1,516,184,000. This is equal to the budget estimate. National Defense Sealift Fund Appropriations, 2012.................................... $1,100,519,000 Budget estimate, 2013................................... 608,136,000 House allowance......................................... 564,636,000 Committee recommendation................................ 697,840,000 The Committee recommends an appropriation of $697,840,000. This is $89,704,000 above the budget estimate. committee recommended program The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ 020 MPF MLP 38,000 144,464 +106,464 Transfer .............. .............. -38,000 funds requested for MLP #4 only to complete MLP #3 AFSB, as requested by Navy Fully fund .............. .............. +144,464 MLP #3 AFSB only 030 Post Delivery 39,386 32,090 -7,296 and Outfitting MLP 3 .............. .............. -7,296 Outfitting and Post delivery--e arly to need 080 Research And 42,811 33,347 -9,464 Development Transfer .............. .............. -9,464 funds requested for MLP AFSB to line 020 to complete MLP #3 AFSB only ------------------------------------------------------------------------ Afloat Forward Staging Base [AFSB].--The fiscal year 2013 budget request includes no funds for the installation of an Engineering Change Proposal [ECP] to convert Mobile Landing Platform [MLP] 3 to an AFSB. The Committee has been informed by the Navy that the installation of this capability requires a total investment of $135,000,000, which the Navy plans to fund by reallocating $38,000,000 that is requested in fiscal year 2013 as Advance Procurement of a second AFSB to the MLP 3 ECP, and by requesting the balance of required funding in fiscal years 2014 and 2015. The Committee is concerned by this funding strategy and recommends transferring the $38,000,000, as requested by the Navy, to MLP 3 for the ECP. In addition, the Committee recommends an additional $97,000,000 in fiscal year 2013 only for the MLP 3 ECP to fully fund the conversion of MLP 3 to an AFSB, subject to the Department's approval of validated requirements. TITLE VI OTHER DEPARTMENT OF DEFENSE PROGRAMS Defense Health Program Appropriations, 2012.................................... $32,482,059,000 Budget estimate, 2013................................... 32,528,718,000 House allowance......................................... 32,902,234,000 Committee recommendation................................ 32,240,788,000 The Committee recommends an appropriation of $32,240,788,000. This is $287,930,000 below the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [In thousands of dollars] -------------------------------------------------------------------------------------------------------------------------------------------------------- Change from 2013 budget House Committee ------------------------------- Item estimate allowance recommendation Budget House estimate allowance -------------------------------------------------------------------------------------------------------------------------------------------------------- DEFENSE HEALTH PROGRAM OPERATION AND MAINTENANCE 31,349,279 31,122,095 30,707,349 -641,930 -414,746 PROCUREMENT 506,462 521,762 506,462 .............. -15,300 RESEARCH DEVELOPMENT TEST AND EVALUATION 672,977 1,258,377 1,026,977 +354,000 -231,400 --------------------------------------------------------------------------------- O&M TRICARE BENEFIT REFORM AND PHARMACY SAVINGS .............. .............. .............. .............. .............. --------------------------------------------------------------------------------- TOTAL, DEFENSE HEALTH PROGRAM 32,528,718 32,902,234 32,240,788 -287,930 -661,446 -------------------------------------------------------------------------------------------------------------------------------------------------------- COMMITTEE RECOMMENDED ADJUSTMENTS The following table details the adjustments recommended by the Committee: [In thousands of dollars] ---------------------------------------------------------------------------------------------------------------- 2013 budget Committee Change from Item request recommendation budget request ---------------------------------------------------------------------------------------------------------------- OPERATION AND MAINTENANCE.................................... 31,349,279 30,707,349 -641,930 IN-HOUSE CARE............................................ 8,625,507 8,558,870 -66,637 Lower than Budgeted TEAM Strength.................... ............... ............... -66,637 PRIVATE SECTOR CARE...................................... 16,148,263 15,577,970 -570,293 Authorization Adjustment to Restore Proposed TRICARE ............... ............... +273,000 Fee Increases....................................... TRICARE Historical Underexecution.................... ............... ............... -807,413 Lower than Budgeted TEAM Strength.................... ............... ............... -35,880 CONSOLIDATED HEALTH CARE................................. 2,309,185 2,309,185 ............... INFORMATION MANAGEMENT................................... 1,465,328 1,465,328 ............... MANAGEMENT HEADQUARTERS.................................. 332,121 332,121 ............... EDUCATION AND TRAINING................................... 722,081 722,081 ............... BASE OPERATIONS AND COMMUNICATIONS....................... 1,746,794 1,741,794 -5,000 Visual Information Systems--Excessive Growth......... ............... ............... -5,000 PROCUREMENT.................................................. 506,462 506,462 ............... RESEARCH AND DEVELOPMENT..................................... 672,977 1,026,977 +354,000 Research and Development................................. 672,977 672,977 ............... Peer-Reviewed Breast Cancer Research................. ............... 120,000 +120,000 Peer-Reviewed Ovarian Cancer Research................ ............... 10,000 +10,000 Peer-Reviewed Prostate Cancer Research............... ............... 64,000 +64,000 Peer-Reviewed Traumatic Brain Injury and ............... 60,000 +60,000 Psychological Health Research....................... Peer Reviewed Medical Research Program............... ............... 50,000 +50,000 Joint Warfighter Medical Research.................... ............... 50,000 +50,000 -------------------------------------------------- TOTAL.............................................. 32,528,718 32,240,788 -287,930 ---------------------------------------------------------------------------------------------------------------- Defense Health Program Reprogramming Procedures.--The Committee remains concerned regarding the transfer of funds from Direct (or In-house) Care to pay for contractor-provided medical care. To limit such transfers and improve oversight within the Defense Health Program operation and maintenance account, the Committee includes a provision which caps the funds available for Private Sector Care under the TRICARE program subject to prior approval reprogramming procedures. The provision and accompanying report language included by the Committee should not be interpreted by the Department as limiting the amount of funds that may be transferred to the Direct Care System from other budget activities within the Defense Health Program. In addition, the Committee continues to designate the funding for the Direct Care System as a special interest item. Any transfer of funds from the Direct (or In- house) Care budget activity into the Private Sector Care budget activity or any other budget activity will require the Department of Defense to follow prior approval reprogramming procedures. The Department shall also provide written notification to the congressional defense committees of cumulative transfers in excess of $15,000,000 out of the Private Sector Care budget subactivity. The Committee further directs the Assistant Secretary of Defense (Health Affairs) to provide quarterly reports to the congressional defense committees on budget execution data for all of the Defense Health Program accounts and to adequately reflect changes to the budget activities requested by the services in future budget submissions. Carryover.--For fiscal year 2013, the Committee recommends 1 percent carryover authority for the operation and maintenance account of the Defense Health Program. The Committee directs the Assistant Secretary of Defense (Health Affairs) to submit a detailed spending plan for any fiscal year 2012 designated carryover funds to the congressional defense committees not fewer than 30 days prior to executing the carryover funds. Temporary End Strength Army Medical [TEAM] Reductions.--The President's fiscal year 2013 budget submission requested funding for TEAM, an additional 12,400 soldiers to mitigate the impact of nondeployable soldiers going through the Integrated Disability Evaluation System [IDES] and ensure operational readiness. This temporary end strength request has since been revised downward to 3,000 soldiers; therefore, the Committee recommends a reduction of $102,517,000. Private Sector Care Underexecution.--According to a review by the Government Accountability Office, the Department underexecuted its Private Sector Care budget by $771,604,000 in fiscal year 2010 and $1,356,245,000 in fiscal year 2011, for an average of 7.1 percent underexecution. In fiscal year 2012, the Congress reduced the Private Sector Care budget by $330,000,000 due to this prior-year underexecution. The Department recently submitted an omnibus reprogramming for fiscal year 2012 in which they identified an additional $707,949,000 of unexecuted funding due to lower than budgeted private sector care cost growth rates. Given this continued trend of prior-year underexecution, the Committee recommends a reduction of $807,413,000 to the fiscal year 2013 budget request, a 5- percent reduction, which is consistent with the fiscal year 2012 anticipated execution level. The Committee urges the Department to submit future year budgets that are more closely aligned with recent provided care patterns. Traumatic Brain Injury [TBI]/Psychological Health [PH].-- The Committee recommends $60,000,000 above the fiscal year 2013 budget request for continued research into treatment and prevention of traumatic brain injuries and improved psychological health. The Committee commends the Department of Defense on the use of a structured peer-reviewed process to recruit the highest qualified research entities for combating the ill-effects of TBI and psychological health in the military. The Committee directs the Assistant Secretary of Defense (Health Affairs) to submit a report to the congressional defense committees within 180 days of enactment of this act on expenditure and obligation data of additional funding added by Congress for psychological health and traumatic brain injury. This report should include information on agreements made with other government agencies. Peer Reviewed Medical Research Program.--The Committee recommends $50,000,000 for a Peer Reviewed Medical Research Program. The Committee directs the Secretary of Defense, in conjunction with the service Surgeons General, to select medical research projects of clear scientific merit and direct relevance to military health. Research areas considered under this funding are restricted to: alcohol and substance abuse, amyotrophic lateral sclerosis, autism, bone marrow failure, chronic kidney disease, chronic migraine and post-traumatic headache, composite tissue transplantation, dengue, DNA vaccine technology for postexposure prophylaxis, duchenne muscular dystrophy, dystonia, epilepsy, food allergies, Fragile X syndrome, gulf war illness, hantavirus, hereditary angioedema, inflammatory bowel disease, interstitial cystitis, kidney cancer, leishmaniasis, lupus, malaria, mesothelioma, multiple sclerosis, nanomedicine for drug delivery science, neuroblastoma, neurofibromatosis, orthopedics, pancreatitis, Parkinson's, polycystic kidney disease, post-traumatic osteoarthritis, pulmonary hypertension, rheumatoid arthritis, scleroderma, spinal cord injury, tinnitus, tuberous sclerosis complex, and vision research. The Committee emphasizes that the additional funding provided under the Peer Reviewed Medical Research Program shall be devoted only to the purposes listed above. Joint Warfighter Medical Research Program.--The Committee recommends $50,000,000 for the Joint Warfighter Medical Research Program. Funds shall be used to augment and accelerate high priority Department of Defense and service medical requirements and to continue prior year initiatives that are close to achieving their objectives and yielding a benefit to military medicine. These funds shall not be used for new projects or basic research. The funding shall be awarded at the Department's discretion following a review of medical research and development gaps, as well as unfinanced medical requirements of the services. Further, the Committee directs the Assistant Secretary of Defense (Health Affairs) to provide a report not later than 180 days after enactment of this act to the congressional defense committees, which lists the projects that receive funding. The report should include the amount of funding provided to each project and a thorough description of each project's research. Integrated Electronic Health Record [iEHR].--The fiscal year 2013 budget request includes $331,016,000 in the Defense Health Program for the continued development of an integrated electronic health record [iEHR]. This is a collaborative effort with the Department of Veterans Affairs in recognition of the need for both Departments to modernize their legacy electronic health record systems and to enhance information sharing between the Departments and the military's and veterans' healthcare providers. Both Departments agreed to purchase commercially available ``off the shelf'' components when feasible and leverage an ``open source'' approach to software acquisition in order to provide a cost-effective and efficient system that will expedite delivery of information sharing. After 4 years of working to establish a joint framework for which to collaborate and develop an integrated electronic health record, the two Departments are still operating as single entities. The Committee supports the creation of the Integrated Program Office [IPO] and recognizes this office as the single point of accountability for the development and implementation of the integrated electronic health record for both Departments. Unfortunately, since the creation of the IPO and the naming of a director, the Committee has seen little benefit derived from establishing this office in that both Departments still appear to operate as separate entities in this effort. Despite repeated inquiries, neither of the Departments nor the IPO has been able to provide Congress with the total cost of the integrated system. The Committee is concerned that the IPO is unable to maintain focus on its defined goals, provide effective governance, manage and maintain accountability on behalf of both Departments, and provide Congress with detailed expenditure plans as well as information regarding the progress and future plans for this project. Therefore, the Committee directs the Government Accountability Office [GAO] to provide a report, not later than 180 days after enactment of this act, assessing the effectiveness of the IPO's governance model in providing oversight for this program and the adequacy of the office structure to support the development and deployment of the iEHR. This report will also identify and assess the budget and cost baseline for the iEHR as well as the schedule associated with the development and deployment of the system. This assessment will include input from both Departments. Finally, GAO will assess the quality of the plan and make recommendations aimed at minimizing cost and schedule risk, and enhancing transparency of the IPO's acquisition strategy for the iEHR. This report shall be delivered to the congressional defense committees and the Senate and House Subcommittees on Appropriations for Military Construction, Veterans Affairs, and Related Agencies. The Committee also directs the Department of Defense to provide written notification to the Committees on Appropriations of the House and Senate prior to obligating any contract or combination of contracts in excess of $5,000,000 as part of this $331,016,000. Integrated Disability Evaluation System.--The Committee remains concerned about the processing times for servicemembers in the Integrated Disability Evaluation System [IDES]. The Committee urges the Departments of Defense and Veterans Affairs to develop and operationalize an end-to-end information technology solution for the IDES in order to improve processing times and servicemembers' access to information regarding their IDES cases. The system should be interoperable between the Departments and capable of being integrated into the Virtual Lifetime Electronic Record. Physical Evaluation Board Liaison Officer [PEBLO] Training.--The Committee remains concerned about the quality of assistance provided to servicemembers by physical evaluation board liaison officers [PEBLO] during the disability evaluation process. To enhance the quality of the information, advice, and counsel servicemembers enrolled in the Integrated Disability Evaluation System [IDES] receive, the Department of Defense shall ensure PEBLO training standards and guidelines include a requirement for formal training within 3 months of assuming their position. The Committee priority in this effort is to address the needs of servicemembers as they are expedited through the IDES process. The Committee believes standardized training of liaison officers will further improve this effort within the Department. Armed Forces Institute of Regenerative Medicine.--The Committee supports the mission of the Armed Forces Institute of Regenerative Medicine and recognizes the multi-institutional consortia's achievements in the validation of new bone regeneration technology, wound healing, craniofacial reconstruction, and burn repair. The Committee encourages the Department of Defense to provide adequate funding to the clinical trial process and to continue to support this critical research which addresses the challenges of caring for servicemembers with multiple traumatic injuries. Military Integrative Medicine.--The Committee recognizes the growing interest in and use of holistic, integrated, and patient-centered practices and models of care within the Military Health System. Not later than 180 days from enactment of this act, the Secretary of Defense shall submit a report to the congressional defense committees with an explanation of the criteria used to evaluate the effectiveness of integrative medicine programs, the results of those evaluations, and the number of servicemembers receiving integrative medical treatment--by service and location of medical care. The report should further outline the Department's plans for future expansion of the evaluation and implementation of integrative medicine for broader military application. Multidisciplinary Brain Research.--The Committee encourages the Secretary of Defense to support multidisciplinary research toward translational medicine that may provide better diagnostic tools and treatment outcomes for servicemembers who suffer from traumatic brain injury, post-traumatic stress disorder, and other neurological diseases. With this support, the Secretary of Defense will enable the creation of a nationwide scientific consortium aimed at integrating nanotechnology, stem cell, cellular therapy, medical imaging, electronic medical records, information technology, and medical devices. The Committee encourages the Secretary of Defense to provide the capabilities necessary for researchers, scientists, surgeons, physicians, healthcare professionals, and patients to effectively communicate their findings and outcomes. With proper support, translational research outcomes would be augmented through near real-time access to information and its integration between researchers, physicians, hospitals, and patients. The Committee encourages the Secretary of Defense to establish this program through the Navy Bureau of Medicine and Surgery [BUMED]. The Committee directs the Secretary of Defense to provide a report not later than 90 days after enactment of this act on possible implementation of this program. Gender-Specific Health Care for Female Servicemembers.--The Committee notes that nearly 275,000 women have deployed in support of Operation Iraqi Freedom, Operation New Dawn, and Operation Enduring Freedom. In order for women to be fully integrated and effective members of the military, their unique health needs must be considered and met. The Committee is pleased that the Department, led by the Army, is studying this issue and encourages the Department to implement the recommendations of the Army's Women's Health Task Force, to include: ensuring deployment comfort packs include gender- specific items for health and hygiene; ensuring all primary care providers, to include those in far forward environments, are trained to diagnose and treat common women's health issues such as menstrual cycle control, contraception, and common urogenital conditions; and ensuring proper supplies and equipment are available to accommodate the needs of female servicemembers. Chemical Agents and Munitions Destruction, Defense Appropriations, 2012.................................... $1,554,422,000 Budget estimate, 2013................................... 1,301,786,000 House allowance......................................... 1,301,786,000 Committee recommendation................................ 1,301,786,000 The Committee recommends an appropriation of $1,301,786,000. This is equal to the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [Dollars in thousands] ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Change from Change from Line Item Qty. 2013 budget Qty. House allowance Qty. Committee --------------------------------------------------- estimate recommendation Qty. Budget estimate Qty. House allowance ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ CHEMICAL AGENTS AND MUNITIONS DESTRUCTION, DEFENSE 1 CHEM DEMILITARIZATION--OPERATION AND MAINTENANCE ....... 635,843 ....... 635,843 ....... 635,843 ....... ............... ....... ............... 3 CHEM DEMILITARIZATION--PROCUREMENT ....... 18,592 ....... 18,592 ....... 18,592 ....... ............... ....... ............... 2 CHEM DEMILITARIZATION--RESEARCH, DEVELOPMENT, TEST AND ....... 647,351 ....... 647,351 ....... 647,351 ....... ............... ....... ............... EVALUATION ----------------------------------------------------------------------------------------------------------------------------------- TOTAL, CHEMICAL AGENTS AND MUNITIONS DESTRUCTION, ....... 1,301,786 ....... 1,301,786 ....... 1,301,786 ....... ............... ....... DEFENSE ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Drug Interdiction and Counter-Drug Activities, Defense Appropriations, 2012.................................... $1,209,620,000 Budget estimate, 2013................................... 999,363,000 House allowance......................................... 1,133,363,000 Committee recommendation................................ 1,138,263,000 The Committee recommends an appropriation of $1,138,263,000. This is $138,900,000 above the budget estimate. COMMITTEE RECOMMENDED ADJUSTMENTS The following table details the adjustments recommended by the Committee: DRUG INTERDICTION AND COUNTER-DRUG ACTIVITIES, DEFENSE EXPLANATION OF PROJECT LEVEL ADJUSTMENTS [In thousands of dollars] ------------------------------------------------------------------------ Fiscal year Committee Change from Line Item 2013 request recommendation budget request ------------------------------------------------------------------------ 010 Drug 889,545 1,002,545 +113,000 Interdiction and Counter- Drug Activities, Defense Counter- .............. .............. +113,000 Drug Program State Plans 020 Drug Demand 109,818 135,718 +25,900 Reduction Program Authorizat .............. .............. +25,900 ion increase expanded drug testing ------------------------------------------------- TOTAL, 999,363 1,138,263 +138,900 DRUG INTERDI CTION AND COUNTER- DRUG ACTIVIT IES, DEFENSE ------------------------------------------------------------------------ Joint Improvised Explosive Device Defeat Fund Appropriations, 2012.................................................... Budget estimate, 2013................................... $227,414,000 House allowance......................................... 217,414,000 Committee recommendation................................................ The Committee does not recommend funding for the Joint Improvised Explosive Device Defeat Fund in the base budget and addresses this requirement in title IX. Joint Urgent Operational Needs Fund Appropriations, 2012.................................................... Budget estimate, 2013................................... $99,477,000 House allowance......................................................... Committee recommendation................................................ The Committee recommends no funding for the Joint Urgent Operational Needs Fund. Office of the Inspector General Appropriations, 2012.................................... $346,919,000 Budget estimate, 2013................................... 273,821,000 House allowance......................................... 350,321,000 Committee recommendation................................ 332,921,000 The Committee recommends an appropriation of $332,921,000. This is $59,100,000 above the budget estimate. This increase is consistent with S. 3254, the National Defense Authorization Act for Fiscal Year 2013, as reported. TITLE VII RELATED AGENCIES Central Intelligence Agency Retirement and Disability System Fund Appropriations, 2012.................................... $513,700,000 Budget estimate, 2013................................... 514,000,000 House allowance......................................... 514,000,000 Committee recommendation................................ 514,000,000 The Committee recommends an appropriation of $514,000,000. This is equal to the budget estimate. Intelligence Community Management Account Appropriations, 2012.................................... $547,891,000 Budget estimate, 2013................................... 540,252,000 House allowance......................................... 511,476,000 Committee recommendation................................ 542,346,000 The Committee recommends an appropriation of $542,346,000. This is $2,094,000 above the budget estimate. TITLE VIII GENERAL PROVISIONS The following lists general provisions proposed by the Committee. The Committee recommends inclusion of several proposals which have been incorporated in previous appropriations acts, provisions requested for inclusion by the Department of Defense, and new provisions. The Committee recommendations are as follows: Sec. 8001. Publicity/Propaganda Limitation.--Retains a provision carried in previous years. Sec. 8002. Compensation/Employment of Foreign Nationals.-- Retains a provision carried in previous years. Sec. 8003. Obligation Rate of Appropriations.--Retains a provision carried in previous years. Sec. 8004. Obligations in Last 2 Months of Fiscal Year.-- Retains a provision carried in previous years. Sec. 8005. Transfers.--Retains and modifies a provision carried in previous years. Sec. 8006. Project Level Adjustments.--Retains and modifies a provision carried last year. Sec. 8007. Establishment of Reprogramming Baseline.-- Retains a provision carried in previous years. Sec. 8008. Working Capital Fund Cash Disbursements.-- Retains a provision carried in previous years. Sec. 8009. Special Access Programs Notification.--Retains a provision carried in previous years. Sec. 8010. Multiyear Procurement Authority.--Retains and modifies a provision carried in previous years. Sec. 8011. Humanitarian and Civic Assistance.--Retains a provision carried in previous years. Sec. 8012. Civilian Personnel Ceilings.--Retains a provision carried in previous years. Sec. 8013. Lobbying.--Retains a provision carried in previous years. Sec. 8014. Educational Benefits and Bonuses.--Retains a provision carried in previous years. Sec. 8015. Mentor-Protege Program.--Retains a provision carried in previous years. Sec. 8016. Anchor Chains.--Retains a provision carried in previous years. Sec. 8017. Demilitarization of Surplus Firearms.--Retains a provision carried in previous years. Sec. 8018. Relocations into the National Capital Region.-- Retains a provision carried in previous years. Sec. 8019. Indian Financing Act Incentives.--Retains a provision carried in previous years. Sec. 8020. Defense Media Activity.--Retains a provision carried in previous years. Sec. 8021. Burdensharing.--Retains a provision carried in previous years. Sec. 8022. Civil Air Patrol.--Retains and modifies a provision carried in previous years. Sec. 8023. Federally Funded Research and Development Centers.--Retains and modifies a provision carried in previous years. Sec. 8024. Carbon, Alloy or Armor Steel Plate.--Retains a provision carried in previous years. Sec. 8025. Congressional Defense Committees Definition.-- Retains a provision carried in previous years. Sec. 8026. Depot Maintenance Competition.--Retains a provision carried in previous years. Sec. 8027. Reciprocal Trade Agreements.--Retains a provision carried in previous years. Sec. 8028. Overseas Military Facility Investment.--Retains a provision carried in previous years. Sec. 8029. Walking Shield.--Retains a provision carried in previous years. Sec. 8030. Investment Item Unit Cost.--Retains a provision carried in previous years. Sec. 8031. Defense Working Capital Fund/Investment Item.-- Retains a provision carried in previous years. Sec. 8032. CIA Availability of Funds.--Retains a provision carried in previous years. Sec. 8033. GDIP Information Systems.--Retains a provision carried in previous years. Sec. 8034. Indian Tribes Environmental Impact.--Retains a provision carried in previous years. Sec. 8035. Compliance With the Buy America Act.--Retains a provision carried in previous years. Sec. 8036. Competition for Consultants and Studies Programs.--Retains a provision carried in previous years. Sec. 8037. Field Operating Agencies.--Retains a provision carried in previous years. Sec. 8038. Sale of F-22 to Foreign Nations.--Retains a provision carried in previous years. Sec. 8039. Organizational Analysis/Contracting Out.-- Retains a provision carried in previous years. Sec. 8040. Rescissions.--The Committee recommends a general provision rescinding funds from prior years as displayed below: ------------------------------------------------------------------------ Amount ------------------------------------------------------------------------ 2007 Appropriations Shipbuilding and Conversion, Navy: DDG-51 Destroyer.................................... $98,400,000 DDG-51 Destroyer Advance Procurement................ 2,500,000 CVN Refueling Overhaul.............................. 14,100,000 2011 Appropriations Procurement of Ammunition, Army: Artillery Fuzes, All Types.......................... 4,500,000 Other Procurement, Army: Defense Enterprise Wideband SATCOM Systems.......... 10,900,000 Tractor Desk........................................ 6,900,000 Prophet Ground...................................... 6,750,000 Sense Through The Wall.............................. 1,845,000 Long Range Advanced Scout Surveillance System....... 17,200,000 BCT Network......................................... 36,000,000 Handheld Standoff Mine Detection System............. 11,500,000 Mounted Soldier System.............................. 2,753,000 Training Logistics Management....................... 21,000,000 Aircraft Procurement, Navy: EA-18G Advance Procurement.......................... 5,960,000 Special Support Equipment........................... 7,800,000 Shipbuilding and Conversion, Navy: DDG-51 Destroyer.................................... 215,300,000 Weapons Procurement, Navy: Tomahawk............................................ 19,000,000 AMRAAM.............................................. 2,086,000 Aircraft Procurement, Air Force: Light Mobility Aircraft............................. 65,300,000 C-130 AMP........................................... 28,100,000 Missile Procurement, Air Force: AMRAAM.............................................. 8,709,000 Other Procurement, Air Force: GCSS-AF (ECSS)...................................... 9,500,000 2012 Appropriations Operation and Maintenance, Defense Wide Office of Economic Adjustment Grant to Guam......... 21,000,000 Aircraft Procurement, Army Utility F/W Aircraft................................ 800,000 MQ-1 Payload--UAS................................... 31,600,000 Global Air Traffic Management....................... 15,000,000 Other Procurement, Army: Tractor Desk........................................ 2,200,000 Gunshot Detection System............................ 1,000,000 Handheld Standoff Mine Detection System............. 34,000,000 Mounted Soldier System.............................. 5,000,000 Training Logistics Management....................... 26,008,000 Knight Family....................................... 31,400,000 Aircraft Procurement, Navy: F-18 E/F Advance Procurement........................ 4,640,000 Shipbuilding and Conversion, Navy: Littoral Combat Ship................................ 28,800,000 Shipbuilding and Conversion, Navy: DDG-51 Destroyer.................................... 83,000,000 Weapons Procurement, Navy: Tomahawk............................................ 2,900,000 AMRAAM.............................................. 6,915,000 ASW Targets......................................... 8,200,000 MK-48 Torpedo Mod................................... 5,448,000 AIM-9X Sidewinder................................... 1,552,000 Other Procurement, Navy: Cooperative Engagement Capability................... 4,800,000 Procurement of Ammunition, Navy and Marine Corps: 60mm, All Types..................................... 6,900,000 81mm, All Types..................................... 22,276,000 Demolition Munitions, All Types..................... 21,527,000 Procurement, Marine Corps: LAV PIP............................................. 86,555,000 Weapons Under $5 million............................ 2,776,000 Follow on to SMAW................................... 37,300,000 Air Operations C2 Systems........................... 8,700,000 Aircraft Procurement, Air Force: CVLSP............................................... 52,800,000 Light Attack Armed Reconnaissance................... 115,049,000 RQ-4 Advance Procurement............................ 71,500,000 B-52 CONECT......................................... 82,500,000 C-130 AMP........................................... 207,200,000 E-3 NGIFF........................................... 14,900,000 C-17 Modifications.................................. 37,750,000 Missile Procurement, Air Force: AMRAAM.............................................. 42,624,000 AIM-9X Sidewinder................................... 3,274,000 Other Procurement, Air Force: GCSS-AF FOS (ECSS).................................. 55,800,000 Procurement, Defense Wide: MDA--AN/TPY-2....................................... 16,000,000 Research, Development, Test and Evaluation, Army: Enhanced Medium Altitude Reconnaissance Surveillance 8,000,000 System [EMARSS].................................... Research, Development, Test and Evaluation, Navy: Joint Air-to-Ground Missile......................... 70,000,000 Surface ASW......................................... 1,900,000 Littoral Combat Ship................................ 15,800,000 AV-8B Aircraft--Eng Dev............................. 7,754,000 Unmanned Carrier Launched Airborne Surveillance and 9,000,000 Strike [UCLASS] System............................. Joint Strike Fighter [JSF]--EMD Navy................ 100,000,000 Medium Range Maritime UAS........................... 9,100,000 Depot Maintenance (Non-IF).......................... 5,000,000 Joint Precision Approach and Landing System......... 26,700,000 Research, Development, Test and Evaluation, Air Force: EW Development (MALD-J II).......................... 8,900,000 Common Vertical Lift Support Platform............... 5,365,000 Light Attack Armed Reconnaissance................... 11,021,000 B-2 Squadrons....................................... 16,500,000 Specialized Undergraduate Pilot Training............ 12,000,000 Minimum Essential Emergency Communications Network.. 2,918,000 ------------------------------------------------------------------------ Sec. 8041. Civilian Technicians Reductions.--Retains a provision carried in previous years. Sec. 8042. Prohibition on Assistance to North Korea.-- Retains a provision carried in previous years. Sec. 8043. Reimbursement for Reserve Component Intelligence Personnel.--Retains a provision carried in previous years. Sec. 8044. Civilian Medical Personnel Reductions.--Retains a provision carried in previous years. Sec. 8045. Counter-Drug Activities Transfer.--Retains a provision carried in previous years. Sec. 8046. Ball and Roller Bearings.--Retains a provision carried in previous years. Sec. 8047. Buy American Computers.--Retains a provision carried in previous years. Sec. 8048. Transfer to Other Agencies.--Retains a provision carried in previous years. Sec. 8049. Restrictions on Transfer of Equipment and Supplies.--Retains a provision carried in previous years. Sec. 8050. Contractor Bonuses Due to Business Restructuring.--Retains a provision carried in previous years. Sec. 8051. Reserve Peacetime Support to Active Duty and Civilian Activities.--Retains a provision carried in previous years. Sec. 8052. Unexpended Balances.--Retains a provision carried in previous years. Sec. 8053. National Guard Distance Learning.--Retains a provision carried in previous years. Sec. 8054. Heating Plants in Europe.--Retains a provision carried in previous years. Sec. 8055. End-Item Procurement.--Retains a provision carried in previous years. Sec. 8056. Buy American Waivers.--Retains a provision carried in previous years. Sec. 8057. Training of Security Forces of a Foreign Country.--Retains a provision carried in previous years. Sec. 8058. Repair and Maintenance of Military Family Housing Units.--Retains a provision carried in previous years. Sec. 8059. JCTD Projects.--Retains a provision carried in previous years. Sec. 8060. Secretary of Defense Reporting Requirement.-- Retains a provision carried in previous years. Sec. 8061. Support to Other Government Agencies.--Retains a provision carried in previous years. Sec. 8062. Use of National Guard Forces.--Retains a provision carried in previous years. Sec. 8063. Armor Piercing Ammunition.--Retains a provision carried in previous years. Sec. 8064. Leasing Authority for National Guard Bureau.-- Retains a provision carried in previous years. Sec. 8065. Alcoholic Beverages.--Retains a provision carried in previous years. Sec. 8066. O&M, Army Transfer.--Retains and modifies a provision carried in previous years. Sec. 8067. Disbursements.--Retains a provision carried in previous years. Sec. 8068. Global Security Contingency Fund Authority.-- Retains a provision carried last year. Sec. 8069. Israeli Cooperative Programs.--Retains and modifies a provision carried in previous years. Sec. 8070. Assignment of Forces.--Retains and modifies a provision carried in previous years. Sec. 8071. Prior Year Shipbuilding.--Retains and modifies a provision carried last year. Sec. 8072. Intelligence Authorization.--Retains a provision carried in previous years. Sec. 8073. New Start Authority.--Retains a provision carried in previous years. Sec. 8074. Contingency Operations Budget Justification.-- Retains a provision carried in previous years. Sec. 8075. Nuclear Armed Interceptors.--Retains a provision carried in previous years. Sec. 8076. Grants.--Retains and modifies a provision carried in previous years. Sec. 8077. 53rd Weather Reconnaissance Squadron.--Retains a provision carried in previous years. Sec. 8078. Terrorism Information Awareness Program.-- Retains a provision carried in previous years. Sec. 8079. Notification of Reserve Mobilization.--Retains a provision carried in previous years. Sec. 8080. SCN Transfer Authority.--Retains a provision carried in previous years. Sec. 8081. SCN Judgment Fund.--Retains a provision carried in previous years. Sec. 8082. Army Tactical UAVs.--Retains and modifies a provision carried in previous years. Sec. 8083. Asia Pacific Regional Initiative.--Retains a provision carried in previous years. Sec. 8084. DNI R&D Waiver.--Retains a provision carried in previous years. Sec. 8085. Shipbuilding Obligations.--Retains a provision carried in previous years. Sec. 8086. Budget Exhibits for Intelligence Programs.-- Retains a provision carried in previous years. Sec. 8087. Arlington National Cemetery.--Includes a new provision providing authority for the Secretary of the Army to appropriate funds for real property maintenance and repair projects and activities at Arlington National Cemetery. Sec. 8088. Intelligence Baseline for Reprogramming.-- Retains a provision carried in previous years. Sec. 8089. Information Sharing.--Retains a provision carried in previous years. Sec. 8090. Future Years Intelligence Budget.--Retains a provision carried last year. Sec. 8091. Congressional Intelligence Committees Definition.--Retains a provision carried in previous years. Sec. 8092. Cost of War Report.--Retains a provision carried in previous years. Sec. 8093. Fisher House Authorization.--Retains a provision carried last year. Sec. 8094. Defense Acquisition Workforce Development Fund.--Retains a provision carried last year. Sec. 8095. Public Disclosure of Agency Reports.--Retains a provision carried in previous years. Sec. 8096. Contractor Compliance with the Civil Rights Act of 1964.--Retains a provision carried in previous years. Sec. 8097. ACORN Funding Prohibition.--Retains a provision carried in previous years. Sec. 8098. DOD-VA Medical Facility Demonstration.--Retains and modifies a provision carried in previous years. Sec. 8099. Travel and Conference Activities.--Includes a new provision placing restriction on funds for travel and conference activities. Sec. 8100. Senior Mentors.--Retains a provision carried in previous years. Sec. 8101. Armored Vehicles.--Retains a provision carried last year. Sec. 8102. Community Development Fund for Guam.--Retains and modifies a provision carried last year. Sec. 8103. Ship Modernization, Operations and Sustainment Fund.--Includes a new provision establishing the Ship Modernization, Operations and Sustainment Fund. Sec. 8104. Construction and Repair of Schools on Military Installations.--Retains and modifies a provision carried last year. Sec. 8105. Transfer of Detainees to or within the United States.--Retains a provision carried in previous years. Sec. 8106. Transfer of Detainees to a Foreign Country or Entity.--Retains a provision carried in previous years. Sec. 8107. Detainee Facilities.--Retains a provision carried in previous years. Sec. 8108. Corporations with Tax Liabilities.--Retains a provision carried last year. Sec. 8109. Corporations Convicted of Felonies.--Retains a provision carried last year. Sec. 8110. Procurement of RQ-4B Global Hawk and C-27J Spartan Aircraft.--Includes a new provision that requires the Secretary of the Air Force to obligate and expend funds previously appropriated for the procurement of RQ-4B Global Hawk and C-27J Spartan aircraft. Sec. 8111. USS ``Ted Stevens''.--Includes a new provision expressing the sense of the Senate regarding the naming of the next capital warship of the U.S. Navy. TITLE IX OVERSEAS CONTINGENCY OPERATIONS Department of Defense--Military The Committee recommends an appropriation of $93,026,000,000 for operations related to Overseas Contingency Operations. In fiscal year 2012 Congress appropriated $114,965,635,000 for activities funded in this title. COMMITTEE RECOMMENDED PROGRAM The following table summarizes the Committee recommendation: [In thousands of dollars] ---------------------------------------------------------------------------------------------------------------- Fiscal year Fiscal year Committee 2012 enacted 2013 estimate recommendation ---------------------------------------------------------------------------------------------------------------- Military personnel........................................... 11,639,252 13,788,421 14,410,421 Operation and maintenance.................................... 89,016,326 62,512,514 65,479,099 Procurement.................................................. 13,633,461 7,911,841 10,126,300 Research, development, test and evaluation................... 526,358 245,516 260,413 Revolving and management funds............................... 435,013 503,364 1,467,864 Other Department of Defense programs......................... 4,137,785 3,249,089 2,987,803 General Provisions (net)..................................... -4,422,560 ............... -1,705,900 -------------------------------------------------- Total, Overseas Contingency Operations................. 114,965,635 88,210,745 93,026,000 ---------------------------------------------------------------------------------------------------------------- OVERVIEW COMMITTEE RECOMMENDATION The Committee recommends $93,026,000,000 of additional appropriations for Overseas Contingency Operations in fiscal year 2013. This funding will ensure that resources, equipment, and supplies are available for our servicemembers without interruption, and will enable the Department to avoid absorbing operational costs from within baseline programs that are critical to future readiness and home-station activities. REPORTING REQUIREMENTS The Committee directs that the Department continue to report incremental contingency operations costs for Operation Enduring Freedom on a monthly basis in the Cost of War Execution report as required by Department of Defense Financial Management Regulation, chapter 23, volume 12. The Committee further directs the Department to continue providing the Cost of War reports to the congressional defense committees that include the following information by appropriation: funding appropriated, funding allocated, monthly obligations, monthly disbursements, cumulative fiscal year obligations, and cumulative fiscal year disbursements. The Committee expects that in order to meet unanticipated requirements, the Department of Defense may need to transfer funds within these appropriations accounts for purposes other than those specified in this report. The Committee directs the Department of Defense to follow normal prior approval reprogramming procedures should it be necessary to transfer funding between different appropriations accounts in this title. Organizational Clothing and Individual Equipment.--The Committee understands supplemental appropriations and overseas contingency operations funds have, for approximately 10 years, enabled considerable advancements in the quality and effectiveness of clothing and protective equipment, as well as advancements in the procedures for fielding such products. The Committee is concerned those advancements in technology and supply chain management for clothing and protective equipment could regress unless funding remains in place in future years. The Committee urges the Department of Defense to consider the long-term needs of the military departments for clothing and individual equipment and to maintain key elements of the Army Rapid Fielding Initiative, the Rapid Equipping Force and combatant command level purchasing authority to enable efficient and quick responses to future requirements. MILITARY PERSONNEL The Committee recommends a total of $14,410,421,000 for pay, allowances, and other personnel costs for Active, Reserve, and Guard troops activated for duty in Afghanistan and other contingency operations. This recommendation includes funding for subsistence, permanent change of station travel, and special pays including imminent danger pay, family separation allowance, and hardship duty pay. Military Personnel, Army Appropriations, 2012.................................... $7,195,335,000 Budget estimate, 2013................................... 9,165,082,000 House allowance......................................... 9,263,779,000 Committee recommendation................................ 9,790,082,000 The Committee recommends an appropriation of $9,790,082,000. This is $625,000,000 above the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ BA 1: PAY AND ALLOWANCES OF OFFICERS 5 Basic Pay 1,569,045 1,751,045 +182,000 Army .............. .............. +182,000 Requested Transfer from Title I: Basic Pay Enlisted 10 Retired Pay 460,708 460,708 .............. Accrual 25 Basic Allowance 463,305 463,305 .............. For Housing 30 Basic Allowance 63,244 63,244 .............. For Subsistence 35 Incentive Pays 4,660 4,660 .............. 40 Special Pays 45,672 45,672 .............. 45 Allowances 21,361 21,361 .............. 50 Separation Pay 6,332 6,332 .............. 55 Social Security 118,601 118,601 .............. Tax ------------------------------------------------- TOTAL 2,752,928 2,934,928 +182,000 ================================================= BA 2: PAY AND ALLOWANCES OF ENLISTED PERSONNEL 60 Basic Pay 2,414,145 2,832,145 +418,000 Army .............. .............. +418,000 Requested Transfer from Title I: Basic Pay Enlisted 65 Retired Pay 686,605 686,605 .............. Accrual 80 Basic Allowance 943,334 943,334 .............. For Housing 85 Incentive Pays 3,614 3,614 .............. 90 Special Pays 224,329 224,329 .............. 95 Allowances 131,845 131,845 .............. 100 Separation Pay 20,915 20,915 .............. 105 Social Security 183,570 183,570 .............. Tax ------------------------------------------------- TOTAL 4,608,357 5,026,357 +418,000 ================================================= BA 4: SUBSISTENCE OF ENLISTED PERSONNEL 115 Basic Allowance 287,016 287,016 .............. For Subsistence 120 Subsistence-In- 862,270 887,270 +25,000 Kind Army .............. .............. +25,000 Requested Transfer from Title I: Subsistence- In-Kind ------------------------------------------------- TOTAL 1,149,286 1,174,286 +25,000 ================================================= BA 5: PERMANENT CHANGE OF STATION TRAVEL 125 Accession Travel 16,933 16,933 .............. 130 Training Travel 16,772 16,772 .............. 135 Operational 90,749 90,749 .............. Travel 140 Rotational 72,592 72,592 .............. Travel 145 Separation 40,634 40,634 .............. Travel 150 Travel of 1,204 1,204 .............. Organized Units ------------------------------------------------- TOTAL 238,884 238,884 .............. ================================================= BA 6: OTHER MILITARY PERSONNEL COSTS 175 Interest On 4,589 4,589 .............. Uniformed Services Savings 180 Death Gratuities 10,800 10,800 .............. 185 Unemployment 248,903 248,903 .............. Benefits 212 Reserve Income 207 207 .............. Replacement Program 216 SGLI Extra 113,317 113,317 .............. Hazard Payments 219 Traumatic Injury 37,811 37,811 .............. Protection Coverage [T- SGLI] ------------------------------------------------- TOTAL 415,627 415,627 .............. ================================================= TOTAL--MIL 9,165,082 9,790,082 +625,000 ITARY PERSONNEL , ARMY ------------------------------------------------------------------------ Military Personnel, Navy Appropriations, 2012.................................... $1,259,234,000 Budget estimate, 2013................................... 874,625,000 House allowance......................................... 879,798,000 Committee recommendation................................ 869,625,000 The Committee recommends an appropriation of $869,625,000. This is $5,000,000 below the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ BA 1: PAY AND ALLOWANCES OF OFFICERS 5 Basic Pay 126,814 126,814 .............. 10 Retired Pay 30,943 30,943 .............. Accrual 25 Basic Allowance 40,210 40,210 .............. For Housing 30 Basic Allowance 4,367 4,367 .............. For Subsistence 35 Incentive Pays 3,886 3,886 .............. 40 Special Pays 22,340 22,340 .............. 45 Allowances 12,967 12,967 .............. 50 Separation Pay 9 9 .............. 55 Social Security 9,701 9,701 .............. Tax ------------------------------------------------- TOTAL 251,237 251,237 .............. ================================================= BA 2: PAY AND ALLOWANCES OF ENLISTED PERSONNEL 60 Basic Pay 162,655 162,655 .............. 65 Retired Pay 39,688 39,688 .............. Accrual 80 Basic Allowance 75,673 75,673 .............. For Housing 85 Incentive Pays 566 566 .............. 90 Special Pays 89,027 89,027 .............. 95 Allowances 30,207 30,207 .............. 100 Separation Pay 410 410 .............. 105 Social Security 12,443 12,443 .............. Tax ------------------------------------------------- TOTAL 410,669 410,669 .............. ================================================= BA 4: SUBSISTENCE OF ENLISTED PERSONNEL 115 Basic Allowance 19,223 19,223 .............. For Subsistence 120 Subsistence-In- 25,647 25,647 .............. Kind ------------------------------------------------- TOTAL 44,870 44,870 .............. ================================================= BA 5: PERMANENT CHANGE OF STATION TRAVEL 125 Accession Travel 4,092 4,092 .............. 135 Operational 21,807 16,807 -5,000 Travel Navy .............. .............. -5,000 Identified Excess to Requirement 140 Rotational 27,897 27,897 .............. Travel 145 Separation 3,168 3,168 .............. Travel ------------------------------------------------- TOTAL 56,964 51,964 -5,000 ================================================= BA 6: OTHER MILITARY PERSONNEL COSTS 180 Death Gratuities 900 900 .............. 185 Unemployment 55,522 55,522 .............. Benefits 216 SGLI Extra 54,463 54,463 .............. Hazard Payments ------------------------------------------------- TOTAL 110,885 110,885 .............. ================================================= TOTAL--MIL 874,625 869,625 -5,000 ITARY PERSONNEL , NAVY ------------------------------------------------------------------------ Military Personnel, Marine Corps Appropriations, 2012.................................... $714,360,000 Budget estimate, 2013................................... 1,621,356,000 House allowance......................................... 1,640,838,000 Committee recommendation................................ 1,623,356,000 The Committee recommends an appropriation of $1,623,356,000. This is $2,000,000 above the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ BA 1: PAY AND ALLOWANCES OF OFFICERS 5 Basic Pay 206,978 206,978 .............. 10 Retired Pay 61,932 61,932 .............. Accrual 25 Basic Allowance 70,235 70,235 .............. For Housing 30 Basic Allowance 8,590 8,590 .............. For Subsistence 40 Special Pays 7,960 7,960 .............. 45 Allowances 5,099 5,099 .............. 50 Separation Pay 1,896 1,896 .............. 55 Social Security 15,834 15,834 .............. Tax ------------------------------------------------- TOTAL 378,524 378,524 .............. ================================================= BA 2: PAY AND ALLOWANCES OF ENLISTED PERSONNEL 60 Basic Pay 542,667 542,667 .............. 65 Retired Pay 166,183 166,183 .............. Accrual 80 Basic Allowance 194,800 194,800 .............. For Housing 90 Special Pays 56,287 56,287 .............. 95 Allowances 22,729 22,729 .............. 100 Separation Pay 4,004 4,004 .............. 105 Social Security 41,514 41,514 .............. Tax ------------------------------------------------- TOTAL 1,028,184 1,028,184 .............. ================================================= BA 4: SUBSISTENCE OF ENLISTED PERSONNEL 115 Basic Allowance 77,753 77,753 .............. For Subsistence ------------------------------------------------- TOTAL 77,753 77,753 .............. ================================================= BA 5: PERMANENT CHANGE OF STATION TRAVEL 140 Rotational 51,816 51,816 .............. Travel ------------------------------------------------- TOTAL 51,816 51,816 .............. ================================================= BA 6: OTHER MILITARY PERSONNEL COSTS 175 Interest on 930 930 .............. Uniformed Services Savings 180 Death Gratuities 12,000 12,000 .............. 185 Unemployment 37,733 39,733 +2,000 Benefits Marine Corps .............. .............. +2,000 Requested Transfer from Procurement , Marine Corps Line 2 to Meet Identified Shortfall 216 SGLI Extra 34,416 34,416 .............. Hazard Payments ------------------------------------------------- TOTAL 85,079 87,079 +2,000 ================================================= TOTAL--MIL 1,621,356 1,623,356 +2,000 ITARY PERSONNEL , MARINE CORPS ------------------------------------------------------------------------ Military Personnel, Air Force Appropriations, 2012.................................... $1,492,381,000 Budget estimate, 2013................................... 1,286,783,000 House allowance......................................... 1,300,640,000 Committee recommendation................................ 1,286,783,000 The Committee recommends an appropriation of $1,286,783,000. This is equal to the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ BA 1: PAY AND ALLOWANCES OF OFFICERS 5 Basic Pay 220,573 220,573 .............. 10 Retired Pay 53,829 53,829 .............. Accrual 25 Basic Allowance 68,601 68,601 .............. For Housing 30 Basic Allowance 7,873 7,873 .............. For Subsistence 40 Special Pays 23,638 23,638 .............. 45 Allowances 10,097 10,097 .............. 55 Social Security 16,877 16,877 .............. Tax ------------------------------------------------- TOTAL 401,488 401,488 .............. ================================================= BA 2: PAY AND ALLOWANCES OF ENLISTED PERSONNEL 60 Basic Pay 332,878 332,878 .............. 65 Retired Pay 81,235 81,235 .............. Accrual 80 Basic Allowance 145,832 145,832 .............. For Housing 90 Special Pays 75,965 75,965 .............. 95 Allowances 29,568 29,568 .............. 105 Social Security 25,468 25,468 .............. Tax ------------------------------------------------- TOTAL 690,946 690,946 .............. ================================================= BA 4: SUBSISTENCE OF ENLISTED PERSONNEL 115 Basic Allowance 36,263 36,263 .............. For Subsistence 120 Subsistence-In- 60,537 60,537 .............. Kind ------------------------------------------------- TOTAL 96,800 96,800 .............. ================================================= BA 5: PERMANENT CHANGE OF STATION TRAVEL 135 Operational 5,243 5,243 .............. Travel ------------------------------------------------- TOTAL 5,243 5,243 .............. ================================================= BA 6: OTHER MILITARY PERSONNEL COSTS 180 Death Gratuities 2,000 2,000 .............. 185 Unemployment 23,174 23,174 .............. Benefits 216 SGLI Extra 67,132 67,132 .............. Hazard Payments ------------------------------------------------- TOTAL 92,306 92,306 .............. ================================================= TOTAL--MIL 1,286,783 1,286,783 .............. ITARY PERSONNEL , AIR FORCE ------------------------------------------------------------------------ Reserve Personnel, Army Appropriations, 2012.................................... $207,162,000 Budget estimate, 2013................................... 156,893,000 House allowance......................................... 158,583,000 Committee recommendation................................ 156,893,000 The Committee recommends an appropriation of $156,893,000. This is equal to the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ BA 1: UNIT AND INDIVIDUAL TRAINING 10 Pay Group A 32,401 32,401 .............. Training (15 Days & Drills 24/48) 70 School Training 15,365 15,365 .............. 80 Special Training 109,127 109,127 .............. ------------------------------------------------- TOTAL 156,893 156,893 .............. ================================================= TOTAL, 156,893 156,893 .............. RESERVE PERSONNEL , ARMY ------------------------------------------------------------------------ Reserve Personnel, Navy Appropriations, 2012.................................... $44,530,000 Budget estimate, 2013................................... 39,335,000 House allowance......................................... 39,759,000 Committee recommendation................................ 39,335,000 The Committee recommends an appropriation of $39,335,000. This is equal to the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ BA 1: UNIT AND INDIVIDUAL TRAINING 70 School Training 3,966 3,966 .............. 80 Special Training 33,813 33,813 .............. 90 Administration 1,556 1,556 .............. and Support ------------------------------------------------- TOTAL 39,335 39,335 .............. ================================================= TOTAL--RES 39,335 39,335 .............. ERVE PERSONNEL , NAVY ------------------------------------------------------------------------ Reserve Personnel, Marine Corps Appropriations, 2012.................................... $25,421,000 Budget estimate, 2013................................... 24,722,000 House allowance......................................... 24,988,000 Committee recommendation................................ 24,722,000 The Committee recommends an appropriation of $24,722,000. This is equal to the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ BA 1: UNIT AND INDIVIDUAL TRAINING 70 School Training 4,437 4,437 .............. 80 Special Training 19,912 19,912 .............. 90 Administration 373 373 .............. and Support ------------------------------------------------- TOTAL 24,722 24,722 .............. ================================================= TOTAL--RES 24,722 24,722 .............. ERVE PERSONNEL , MARINE CORPS ------------------------------------------------------------------------ Reserve Personnel, Air Force Appropriations, 2012.................................... $26,815,000 Budget estimate, 2013................................... 25,348,000 House allowance......................................... 25,621,000 Committee recommendation................................ 25,348,000 The Committee recommends an appropriation of $25,348,000. This is equal to the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ BA 1: UNIT AND INDIVIDUAL TRAINING 80 Special Training 25,348 25,348 .............. ------------------------------------------------- TOTAL 25,348 25,348 .............. ================================================= TOTAL--RES 25,348 25,348 .............. ERVE PERSONNEL , AIR FORCE ------------------------------------------------------------------------ National Guard Personnel, Army Appropriations, 2012.................................... $664,579,000 Budget estimate, 2013................................... 583,804,000 House allowance......................................... 590,091,000 Committee recommendation................................ 583,804,000 The Committee recommends an appropriation of $583,804,000. This is equal to the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ BA1: UNIT AND INDIVIDUAL TRAINING 10 Pay Group A 132,368 132,368 .............. Training (15 Days & Drills 24/48) 70 School Training 21,461 21,461 .............. 80 Special Training 369,858 369,858 .............. 90 Administration 60,117 60,117 .............. and Support ------------------------------------------------- TOTAL 583,804 583,804 .............. ================================================= TOTAL, 583,804 583,804 .............. NATIONAL GUARD PERSONNEL , ARMY ------------------------------------------------------------------------ National Guard Personnel, Air Force Appropriations, 2012.................................... $9,435,000 Budget estimate, 2013................................... 10,473,000 House allowance......................................... 10,586,000 Committee recommendation................................ 10,473,000 The Committee recommends an appropriation of $10,473,000. This is equal to the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ BA 1: UNIT AND INDIVIDUAL TRAINING 80 Special Training 10,473 10,473 .............. ------------------------------------------------- TOTAL 10,473 10,473 .............. ================================================= TOTAL--NAT 10,473 10,473 .............. IONAL GUARD PERSONNEL , AIR FORCE ------------------------------------------------------------------------ OPERATION AND MAINTENANCE The Committee recommends $65,479,099,000 for the operation and maintenance accounts. These funds are available to fund overseas deployments and other activities by the services and Special Operations Forces to include financing flying hours, ship steaming days, ground operations, special airlift missions, increased ship and aircraft maintenance, logistics support, fuel purchases, base support, civilian personnel, personnel support costs, overseas transportation, communications support, facility management, and other operation and maintenance requirements. Operation and Maintenance, Army Appropriations, 2012.................................... $44,794,156,000 Budget estimate, 2013................................... 28,591,441,000 House allowance......................................... 26,682,437,000 Committee recommendation................................ 30,578,256,000 The Committee recommends an appropriation of $30,578,256,000. This is $1,986,815,000 above the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ 114 Theater Level 2,758,162 2,758,162 .............. Assets 115 Land Forces 991,396 1,133,193 +141,797 Operations Support Transfer .............. .............. +141,797 from Title II: Combat Training Centers 116 Aviation Assets 40,300 101,805 +61,505 Transfer .............. .............. +61,505 from Title II: Theater Demand Reduction 121 Force Readiness 1,755,445 2,015,334 +259,889 Operations Support Decrease in .............. .............. -40,000 Contract Linguist Costs Not Properly Accounted for in Budget Justificati on Transfer .............. .............. +71,660 from Title II: Body Armor Sustainment Transfer .............. .............. +228,229 from Title II: Forward Operating Base-- Kuwait 122 Land Forces 307,244 307,244 .............. Systems Readiness 123 Land Forces .............. 1,134,602 +1,134,602 Depot Maintenance Transfer .............. .............. +150,483 from Title II: Depot Maintenance -Aviation Transfer .............. .............. +203,560 from Title II: Depot Maintenance -Communicat ions Electronics Transfer .............. .............. +102,707 from Title II: Depot Maintenance -General Purpose Transfer .............. .............. +161,174 from Title II: Depot Maintenance -Missiles Transfer .............. .............. +516,678 from Title II: Depot Maintenance -Post Production Software Support [PPSS] 131 Base Operations 393,165 593,165 +200,000 Support Transfer .............. .............. +200,000 from Title II: Overseas Security Guards 132 Facilities, 250,000 250,000 .............. Sustainment, Restoration, and Modernization 135 Additional 12,524,137 12,954,159 +430,022 Activities Task Force .............. .............. -10,000 for Stability Operations: Operations/ Sustainment Request ARGUS A-160 .............. .............. -48,400 Cancellatio n Transfer .............. .............. +48,000 from JIEDDO Line 1: Falcon Transfer .............. .............. +217,376 from Title II SAG 111: Combined Arms Training Strategy Transfer .............. .............. +148,194 from Title II SAG 111: Theater Demand Reduction Transfer .............. .............. +74,852 from Title II SAG 113: Combined Arms Training Strategy 136 Commander's 400,000 200,000 -200,000 Emergency Response Program CERP-Reduced .............. .............. -200,000 Operational Need 137 Reset 3,687,973 3,687,973 .............. 411 Security 1,828,717 1,805,717 -23,000 Programs Classified .............. .............. -23,000 Adjustment 421 Servicewide 3,238,310 3,238,310 .............. Transportation 422 Central Supply 129,000 129,000 .............. Activities 424 Ammunition 78,022 78,022 .............. Management 432 Servicewide .............. 22,000 +22,000 Communications Transfer .............. .............. +22,000 from JIEDDO Line 1: Biometrics ID Funding to be used for Biometrics Identity Management Agency [BIMA] 434 Other Personnel 137,277 97,277 -40,000 Support Army- .............. .............. -40,000 Requested Transfer to Other Procurement , Army Line 61: Fiber Optic Cable 435 Other Service 72,293 72,293 .............. Support ------------------------------------------------- Total, 28,591,441 30,578,256 +1,986,815 Operation and Maintenan ce, Army ------------------------------------------------------------------------ Commanders Emergency Response Program.--The Committee recommends $200,000,000 for the Commanders Emergency Response Program [CERP] in Afghanistan in fiscal year 2013, the amount recommended in S. 3254, the National Defense Authorization Act for Fiscal Year 2013, as reported. The Committee directs the Army to submit monthly commitment, obligation, and expenditure data for CERP to the congressional defense committees no later than 30 days after each month. CERP Projects.--The Committee includes language in the Commander's Emergency Response Program [CERP] general provision that requires all projects executed under this authority shall be small scale, and shall not exceed $20,000,000 in cost (including any ancillary or related elements in connection with such project). Task Force for Business and Stability Operations [TFBSO].-- The fiscal year 2013 budget request for the Task Force for Business and Stability Operations is $93,000,000 for projects and $76,000,000 for its operations and administration. This year's budget request for projects has decreased from the fiscal year 2012 request of $150,000,000, while the operations and administration budget has remained steady. Therefore, the Committee recommends a reduction of $10,000,000 for TFBSO operations and administration to reflect the decline in project funding. The Committee understands the unique nature of the programs and initiatives offered by TFBSO. The Committee is concerned with the lack of clear strategic goals and direction on past projects and the lack of TFBSO oversight on the contracts developed in support of its own efforts. The Committee is encouraged with new leadership within the organization that has committed to carefully evaluate current and future projects and contracts but remains concerned that a lack of proper oversight could lead to mismanagement of taxpayer funds. Therefore, the Committee directs the TFBSO to work with the Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics to ensure contracts meet the standards and quality required by Department of Defense regulations. In addition, the Committee directs the Task Force to provide a report to the congressional defense committees not later than 90 days after enactment of this act on all current and planned programs and initiatives funded by TFBSO and the deliverables to be achieved under these projects. Additionally, the Committee directs the TFBSO to provide a quarterly report to the congressional defense committees on all current and future TFBSO initiated projects to include timelines for project completion and for obligations and expenditures of each project. Operation and Maintenance, Navy Appropriations, 2012.................................... $7,674,026,000 Budget estimate, 2013................................... 5,880,395,000 House allowance......................................... 5,880,395,000 Committee recommendation................................ 6,968,812,000 The Committee recommends an appropriation of $6,968,812,000. This is $1,088,417,000 above the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ 1A1A Mission and 937,098 1,118,043 +180,945 Other Flight Operations Transfer .............. .............. +180,945 from Title II: Flying Hours 1A3A Aviation 1,000 1,000 .............. Technical Data and Engineering Services 1A4A Air Operations 15,794 15,794 .............. and Safety Support 1A4N Air Systems 19,013 19,013 .............. Support 1A5A Aircraft Depot 201,912 201,912 .............. Maintenance 1A6A Aviation Depot 3,000 3,000 .............. Operations Support 1A9A Aviation 44,150 44,150 .............. Logistics 1B1B Mission and 463,738 968,558 +504,820 Other Ship Operations Transfer .............. .............. +504,820 from Title II: Ship Consumables , Repair Parts, Fuel, Administrat ion 1B2B Ship Operations 24,774 24,774 .............. Support and Training 1B4B Ship Depot 1,310,010 1,310,010 .............. Maintenance 1C1C Combat 42,965 42,965 .............. Communications 1C4C Warfare Tactics 25,970 25,970 .............. 1C5C Operational 19,226 19,226 .............. Meteorology and Oceanography 1C6C Combat Support 1,668,359 2,124,160 +455,801 Forces Unjustified .............. .............. -30,000 Growth for C4I and Other Services and Miscellaneo us Contracts Navy- .............. .............. +219,000 Identified Shortfalls for CENTCOM: Increased Carrier Presence Navy- .............. .............. +56,000 Identified Shortfalls for CENTCOM: ISR Navy- .............. .............. +18,000 Identified Shortfalls for CENTCOM: Mine Countermeas ure Ships Transfer .............. .............. +192,801 from Title II: Naval Expeditiona ry Combat Command Increases 1C7C Equipment 7,954 7,954 .............. Maintenance 1D3D In-Service 94,655 64,655 -30,000 Weapons Systems Support Unjustified .............. .............. -30,000 Growth for Other Supplies and Equipment 1D4D Weapons 303,087 303,087 .............. Maintenance BSM1 Facilities 3,218 22,391 +19,173 Sustainment, Restoration, and Modernization Transfer .............. .............. +19,173 from Title II: Camp Lemonnier, Djibouti BSS1 Base Operating 143,442 316,717 +173,275 Support Transfer .............. .............. +173,275 from Title II: Camp Lemonnier, Djibouti 2C1H Expeditionary 31,395 34,883 +3,488 Health Service Systems Transfer .............. .............. +3,488 from Title II: Camp Lemonnier, Djibouti 2C3H Coast Guard 254,461 .............. -254,461 Support Transfer to .............. .............. -254,461 Department of Homeland Security 3B1K Specialized 50,903 50,903 .............. Skill Training 4A1M Administration 1,377 1,377 .............. 4A2M External 487 487 .............. Relations 4A4M Military 6,022 34,533 +28,511 Manpower and Personnel Management Transfer .............. .............. +28,511 from Title II: Camp Lemonnier, Djibouti 4A5M Other Personnel 3,514 3,514 .............. Support 4B1N Servicewide 184,864 184,864 .............. Transportation 4B3N Acquisition and 2,026 8,891 +6,865 Program Management Transfer .............. .............. +6,865 from Title II: Camp Lemonnier, Djibouti 9999 Classified 15,981 15,981 .............. Programs ------------------------------------------------- Total, 5,880,395 6,968,812 +1,088,417 Operation and Maintenan ce, Navy ------------------------------------------------------------------------ Operation and Maintenance, Marine Corps Appropriations, 2012.................................... $3,935,210,000 Budget estimate, 2013................................... 4,066,340,000 House allowance......................................... 4,566,340,000 Committee recommendation................................ 4,108,340,000 The Committee recommends an appropriation of $4,108,340,000. This is $42,000,000 above the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ 1A1A Operational 1,921,258 1,851,258 -70,000 Forces Unjustified .............. .............. -20,000 Growth for Reserve Component Activation/ Deactivatio n Unjustified .............. .............. -50,000 Growth for OPTEMPO 1A2A Field Logistics 1,094,028 1,094,028 .............. 1A3A Depot 222,824 334,824 +112,000 Maintenance Transfer .............. .............. +112,000 from Title II: Depot Maintenance BSS1 Base Operating 88,690 88,690 .............. Support 3B4D Training Support 215,212 215,212 .............. 4A3G Servicewide 512,627 512,627 .............. Transportation 4A4G Administration 11,701 11,701 .............. ------------------------------------------------- Total, 4,066,340 4,108,340 +42,000 Operation and Maintenan ce, Marine Corps ------------------------------------------------------------------------ Operation and Maintenance, Air Force Appropriations, 2012.................................... $10,879,347,000 Budget estimate, 2013................................... 9,241,613,000 House allowance......................................... 9,136,236,000 Committee recommendation................................ 9,291,493,000 The Committee recommends an appropriation of $9,291,493,000. This is $49,880,000 above the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ 011A Primary Combat 1,494,144 1,564,144 +70,000 Forces Transfer .............. .............. +70,000 from Title II: Theater Security Package 011C Combat 809,531 809,531 .............. Enhancement Forces 011D Air Operations 13,095 81,375 +68,280 Training Transfer .............. .............. +68,280 from Title II: Flag Exercises 011M Depot 1,403,238 1,403,238 .............. Maintenance 011R Facilities 155,954 105,954 -50,000 Sustainment, Restoration, and Modernization Unjustified .............. .............. -50,000 Growth in FSRM Projects 011Z Base Operating 342,226 342,226 .............. Support 012A Global C3I and 15,108 15,108 .............. Early Warning 012C Other Combat Ops 271,390 271,390 .............. Spt Programs 012F Tactical 25,400 25,400 .............. Intelligence and Special Activities 013C Space Control 5,110 5,110 .............. Systems 015A Combatant 52,173 52,173 .............. Commanders Direct Mission Support 021A Airlift 3,187,211 3,187,211 .............. Operations 021D Mobilization 43,509 43,509 .............. Preparedness 021M Depot 554,943 554,943 .............. Maintenance 021R Facilities 4,431 4,431 .............. Sustainment, Restoration, and Modernization 021Z Base Support 9,256 9,256 .............. 031R Facilities 424 424 .............. Sustainment, Restoration, and Modernization 031Z Base Support 1,036 1,036 .............. 032A Specialized 10,923 10,923 .............. Skill Training 032B Flight Training 72 72 .............. 032C Professional 323 323 .............. Development Education 032D Training Support 352 352 .............. 041A Logistics 100,429 100,429 .............. Operations 041R Facilities 47,200 47,200 .............. Sustainment, Restoration, and Modernization 041Z Base Support 7,242 7,242 .............. 042A Administration 1,552 1,552 .............. 042B Servicewide 82,094 82,094 .............. Communications 042G Other 582,977 537,977 -45,000 Servicewide Activities Unjustified .............. .............. -45,000 Growth for the Defense Finance and Accounting Services [DFAS] Bill 043A Security 20,270 26,870 +6,600 Programs Classified .............. .............. +6,600 Adjustment ------------------------------------------------- Total, 9,241,613 9,291,493 +49,880 Operation and Maintenan ce, Air Force ------------------------------------------------------------------------ Operation and Maintenance, Defense-Wide Appropriations, 2012.................................... $9,252,211,000 Budget estimate, 2013................................... 7,824,579,000 House allowance......................................... 7,790,579,000 Committee recommendation................................ 8,274,052,000 The Committee recommends an appropriation of $8,274,052,000. This is $449,473,000 above the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ Joint Chiefs of 2,000 2,000 .............. Staff Special 2,503,060 2,946,233 +443,173 Operations Command Transfer .............. .............. +443,173 from Title II: SOCOM- Identified Costs Moved into the Base Budget in Fiscal Year 2013 Previously Funded in OCO Defense Contract 30,674 30,674 .............. Audit Agency Defense Contract 69,803 69,803 .............. Management Agency Defense Human 3,334 3,334 .............. Resource Activity Defense 152,925 152,925 .............. Information Systems Agency Defense Legal 102,322 102,322 .............. Services Agency Defense Media 10,823 10,823 .............. Activity Department of 139,830 159,830 +20,000 Defense Education Activity Beyond .............. .............. +20,000 Yellow Ribbon Programs Defense Security 2,200,000 2,200,000 .............. Cooperation Agency Office of the 87,805 74,105 -13,700 Secretary of Defense Civilian .............. .............. -1,500 Expeditiona ry Workforce Project .............. .............. -12,200 Archer Classified 2,522,003 2,522,003 .............. Programs ------------------------------------------------- Total, 7,824,579 8,274,052 +449,473 Operation and Maintenan ce, Defense- Wide ------------------------------------------------------------------------ Northern Distribution Network [NDN].--The Committee directs the Secretary of Defense to submit a report to the congressional defense committees not later than 90 days after enactment of this act on all projects and initiatives associated with the Northern Distribution Network support activities, to include multimodal access points. The report should include detailed cost estimates and a spend plan for each project and timelines for project execution and completion. Beyond Yellow Ribbon Programs.--The Committee provides an additional $20,000,000 for the Yellow Ribbon Reintegration Program Office under the Defense Human Resource Activity and is directed to use the funds for National Guard and Reserve outreach and reintegration programs, National Guard and Reserve employment enhancement programs and peer-to-peer hotline services for mental health and suicide prevention initiatives. For the peer-to-peer hotline services, the Committee encourages continued coordination between the Defense Human Resource Activity, the National Guard Bureau and the Assistant Secretary of Defense for Reserve Affairs. Operation and Maintenance, Army Reserve Appropriations, 2012.................................... $217,500,000 Budget estimate, 2013................................... 154,537,000 House allowance......................................... 157,887,000 Committee recommendation................................ 154,537,000 The Committee recommends an appropriation of $154,537,000. This is equal to the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ 113 Echelons Above 78,600 78,600 .............. Brigade 115 Land Force 20,811 20,811 .............. Operations Support 121 Force Readiness 20,726 20,726 .............. Operations Support 131 Base Operations 34,400 34,400 .............. Support ------------------------------------------------- Total, 154,537 154,537 .............. Operation and Maintenan ce, Army Reserve ------------------------------------------------------------------------ Operation and Maintenance, Navy Reserve Appropriations, 2012.................................... $74,148,000 Budget estimate, 2013................................... 55,924,000 House allowance......................................... 55,924,000 Committee recommendation................................ 55,924,000 The Committee recommends an appropriation of $55,924,000. This is equal to the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ 1A1A Mission and 24,834 24,834 .............. Other Flight Operations 1A3A Intermediate 300 300 .............. Maintenance 1A5A Aircraft Depot 13,364 13,364 .............. Maintenance 1B1B Mission and 8,213 8,213 .............. Other Ship Operations 1B4B Ship Depot 929 929 .............. Maintenance 1C6C Combat Support 8,244 8,244 .............. Forces BSSR Base Operating 40 40 .............. Support ------------------------------------------------- Total, 55,924 55,924 .............. Operation and Maintenan ce, Navy Reserve ------------------------------------------------------------------------ Operation and Maintenance, Marine Corps Reserve Appropriations, 2012.................................... $36,084,000 Budget estimate, 2013................................... 25,477,000 House allowance......................................... 25,477,000 Committee recommendation................................ 25,477,000 The Committee recommends an appropriation of $25,477,000. This is equal to the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ 1A1A Operating Forces 22,657 22,657 .............. BSS1 Base Operating 2,820 2,820 .............. Support ------------------------------------------------- Total, 25,477 25,477 .............. Operation and Maintenan ce, Marine Corps Reserve ------------------------------------------------------------------------ Operation and Maintenance, Air Force Reserve Appropriations, 2012.................................... $142,050,000 Budget estimate, 2013................................... 120,618,000 House allowance......................................... 120,618,000 Committee recommendation................................ 120,618,000 The Committee recommends an appropriation of $120,618,000. This is equal to the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ 011A Primary Combat 7,600 7,600 .............. Forces 011M Depot 106,768 106,768 .............. Maintenance 011Z Base Support 6,250 6,250 .............. ------------------------------------------------- Total, 120,618 120,618 .............. Operation and Maintenan ce, Air Force Reserve ------------------------------------------------------------------------ Operation and Maintenance, Army National Guard Appropriations, 2012.................................... $377,544,000 Budget estimate, 2013................................... 382,448,000 House allowance......................................... 392,448,000 Committee recommendation................................ 382,448,000 The Committee recommends an appropriation of $382,448,000. This is equal to the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ 111 Maneuver Units 38,485 38,485 .............. 112 Modular Support 1,959 1,959 .............. Brigades 113 Echelons Above 20,076 20,076 .............. Brigade 114 Theater Level 2,028 2,028 .............. Assets 116 Aviation Assets 183,811 183,811 .............. 121 Force Readiness 43,780 43,780 .............. Operations Support 131 Base Operations 70,237 70,237 .............. Support 133 Management and 20,072 20,072 .............. Operational Headquarters 432 Servicewide 2,000 2,000 .............. Communication ------------------------------------------------- Total, 382,448 382,448 .............. Operation and Maintenan ce, Army National Guard ------------------------------------------------------------------------ Operation and Maintenance, Air National Guard Appropriations, 2012.................................... $34,050,000 Budget estimate, 2013................................... 19,975,000 House allowance......................................... 34,500,000 Committee recommendation................................ 19,975,000 The Committee recommends an appropriation of $19,975,000. This is equal to the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ 011G Mission Support 19,975 19,975 .............. Operations ------------------------------------------------- Total, 19,975 19,975 .............. Operation and Maintenan ce, Air National Guard ------------------------------------------------------------------------ Afghanistan Infrastructure Fund Appropriations, 2012.................................... $400,000,000 Budget estimate, 2013................................... 400,000,000 House allowance......................................... 200,000,000 Committee recommendation................................ 350,000,000 The Committee recommends an appropriation of $350,000,000. This is $50,000,000 below the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ Power 100,000 100,000 .............. Water 300,000 300,000 .............. ------------------------------------------------- Subtotal, 400,000 400,000 .............. Afghanist an Infrastru cture Fund ================================================= Author .............. -50,000 -50,000 izati on Adjus tment ------------------------------------------------- Tota 400,000 350,000 -50,000 l, Afg han ist an Inf ras tru ctu re Fun d ------------------------------------------------------------------------ Afghanistan Infrastructure Fund.--The fiscal year 2013 budget request includes $400,000,000 for the Afghanistan Infrastructure Fund [AIF]. The Committee notes the large unobligated balances of prior year AIF funding and recommends a reduction of $50,000,000 to the fiscal year 2013 request. While supportive of the goals of AIF, the Committee is concerned with the long term sustainability of large scale infrastructure projects, many of which may still be underway long after United States forces have withdrawn from Afghanistan in 2014. Therefore, the Committee directs the Secretary of Defense to submit a report to the congressional defense committees not later than 90 days after enactment of this act on the long term sustainability costs of current and future AIF projects and the plan to cover any cost growth above those estimated in the budget submission. Afghanistan Security Forces Fund Appropriations, 2012.................................... $11,200,000,000 Budget estimate, 2013................................... 5,749,167,000 House allowance......................................... 4,592,213,000 Committee recommendation................................ 5,149,167,000 The Committee recommends an appropriation of $5,149,167,000. This is $600,000,000 below the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ Infrastructure 190,000 90,000 -100,000 Equipment and 241,521 241,521 .............. Transportation Training and 758,380 758,380 .............. Operations Sustainment 2,523,825 2,523,825 .............. ------------------------------------------------- Subtotal, 3,713,726 3,613,726 -100,000 Ministry of Defense ================================================= Infrastructure 50,000 50,000 .............. Equipment and 84,859 84,859 .............. Transportation Training and 569,868 569,868 .............. Operations Sustainment 1,305,950 1,305,950 .............. ------------------------------------------------- Subtotal, 2,010,677 2,010,677 .............. Ministry of Interior ================================================= Infrastructure 1,200 1,200 .............. Equipment and 1,239 1,239 .............. Transportation Training and 4,000 4,000 .............. Operations Sustainment 18,325 18,325 .............. ------------------------------------------------- Subtotal, 24,764 24,764 .............. Related Activitie s ================================================= Reduction .............. -500,000 -500,000 due to prior year unobligated balances ------------------------------------------------- Total, 5,749,167 5,149,167 -600,000 Afghanist an Security Forces Fund ------------------------------------------------------------------------ Afghanistan Security Forces Fund [ASFF].--The President's budget request includes $5,749,167,000 for the Afghanistan Security Forces Fund for fiscal year 2013, a nearly 50-percent decrease from the fiscal year 2012 appropriated amount of $11,200,000,000. The Department of Defense [DOD] reprogrammed $1,000,000,000 of unobligated ASFF funding from fiscal year 2011. U.S. Central Command informed the Committee that the fiscal year 2012 spending estimate would be revised downward by $2,800,000,000 and that the Department intended to reprogram a portion of these excess funds. Therefore, the Committee recommends a rescission of $1,000,000,000 from the fiscal year 2012 Afghanistan Security Forces Fund and a reduction of $600,000,000 in fiscal year 2013 ASFF. PROCUREMENT The Committee recommends $10,126,300,000 for the procurement accounts. The Overseas Contingency Operations funding supports our forces engaged in Operation Enduring Freedom and other contingency operations. The Committee provides funding to replace combat losses and equipment left behind in theater, augment and upgrade equipment for deploying units, sustain munitions and other war consumables, and reset the units returning home to an equipment-ready status. Funding adjustments have been made in instances where the requirement was poorly defined, funding was requested ahead of need or program execution has been delayed. Aircraft Procurement, Army Appropriations, 2012.................................... $1,137,381,000 Budget estimate, 2013................................... 486,200,000 House allowance......................................... 541,600,000 Committee recommendation................................ 1,140,294,000 The Committee recommends an appropriation of $1,140,294,000. This is $654,094,000 above the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ 3 MQ-1 UAV .............. 414,088 +414,088 Transfer .............. .............. +414,088 from Title III 4 RQ-11 [RAVEN] .............. 25,798 +25,798 Transfer .............. .............. +25,798 from Title III 9 AH-64 Apache 71,000 142,000 +71,000 Block IIIB New Build Two Apache .............. .............. +71,000 battle loss replacement s 12 Kiowa Warrior 183,900 105,900 -78,000 [OH-58F] WRA Maintain .............. .............. -78,000 fiscal year 2012 WRA rate 13 UH-60 Blackhawk .............. 36,600 36,600 M Model [MYP] Army .............. .............. +36,600 requested transfer from PAA Line 7 Title III and IX for Battle loss replacement s 15 CH-47 Helicopter 231,300 231,300 .............. 18 MQ-1 Payload-- .............. 184,608 +184,608 UAS Transfer .............. .............. +184,608 from Title III ------------------------------------------------- Total, 486,200 1,140,294 654,094 Aircraft Procureme nt, Army ------------------------------------------------------------------------ Missile Procurement, Army Appropriations, 2012.................................... $126,556,000 Budget estimate, 2013................................... 49,653,000 House allowance......................................... 49,653,000 Committee recommendation................................ 67,951,000 The Committee recommends an appropriation of $67,951,000. This is $18,298,000 above the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ 4 Hellfire Sys 29,100 48,700 19,600 Summary Army .............. .............. +19,600 Identified Shortfall For Additional Missiles 8 Guided MLRS 20,553 19,251 -1,302 Rocket [GMLRS] Unit Cost .............. .............. -1,302 Efficiencie s ------------------------------------------------- Total, 49,653 67,951 +18,298 Missile Procureme nt, Army ------------------------------------------------------------------------ Procurement of Weapons and Tracked Combat Vehicles, Army Appropriations, 2012.................................... $37,117,000 Budget estimate, 2013................................... 15,422,000 House allowance......................................... 15,422,000 Committee recommendation................................ 15,422,000 The Committee recommends an appropriation of $15,422,000. This is equal to the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ 36 M16 Rifle Mods 15,422 15,422 .............. ------------------------------------------------- Total, 15,422 15,422 .............. Procureme nt of WTCV, Army ------------------------------------------------------------------------ Procurement of Ammunition, Army Appropriations, 2012.................................... $208,381,000 Budget estimate, 2013................................... 357,493,000 House allowance......................................... 338,493,000 Committee recommendation................................ 326,193,000 The Committee recommends an appropriation of $326,193,000. This is $31,300,000 below the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ 3 Ctg, Handgun, 1,500 1,500 .............. All Types 4 Ctg, .50 Cal, 10,000 10,000 .............. All Types 7 Ctg, 30mm, All 80,000 61,000 -19,000 Types Army .............. .............. -18,600 requested transfer to Title IX Aircraft Procurement , Army Line 13 Excess to .............. .............. -400 requirement 9 60mm Mortar, All 14,000 14,000 .............. Types 10 81mm Mortar, All 6,000 6,000 .............. Types 11 120mm Mortar, 56,000 56,000 .............. All Types 13 Artillery 29,956 29,956 .............. Cartridges, 75MM and 105MM, All Types 14 Artillery 37,044 37,044 .............. Projectile, 155MM, All Types 15 Proj 155mm 12,300 .............. -12,300 Extended Range Xm982 Contract .............. .............. -12,300 award delays 16 Artillery 17,000 17,000 .............. Propellants, Fuzes, and Primers, All Types 17 Mines and 12,000 12,000 .............. Clearing Charges, All Types 20 Rocket, Hydra 63,635 63,635 .............. 70, All Types 23 Signals, All 16,858 16,858 .............. Types 28 Items Less Than 1,200 1,200 .............. $5,000,000 ------------------------------------------------- TOTAL 357,493 326,193 -31,300 ------------------------------------------------------------------------ Other Procurement, Army Appropriations, 2012.................................... $1,334,345,000 Budget estimate, 2013................................... 2,015,907,000 House allowance......................................... 2,005,907,000 Committee recommendation................................ 2,284,190,000 The Committee recommends an appropriation of $2,284,190,000. This is $268,283,000 above the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ 2 Family of Medium 28,247 28,247 .............. Tactical Vehicles [FMTV] 4 Family of Heavy 2,050 2,050 .............. Tactical Vehicles [FHTV] 11 HMMWV 271,000 171,000 -100,000 Recapitalizatio n Program Excess to .............. .............. -100,000 need 14 Mine-Resistant 927,400 721,400 -206,000 Ambush- Protected [MRAP] Mods Federal .............. .............. -106,000 Roads Excise Tax Excess to .............. .............. -100,000 need 52 Reserve CA/MISO 8,000 8,000 .............. GPF Equipment 61 Installation 25,000 40,000 +15,000 Info Infrastructure Mod Program Army .............. .............. +40,000 requested transfer from Operation and Maintenance , Army, line 434-- fiber optic line Excess to .............. .............. -25,000 need 69 DCGS-A [MIP] 90,355 274,362 +184,007 Transfer .............. .............. +184,007 from Title III--DCGS-A 73 CI Humint Auto 6,516 6,516 .............. Reprinting and Collection 75 Lightweight 27,646 27,646 .............. Counter Mortar Radar 77 Family of 52,000 27,000 -25,000 Persistent Surveillance Capabilities Delayed .............. .............. -25,000 spares contract awards 78 Counterintellige 205,209 152,459 -52,750 nce/Security Countermeasures Prior year .............. .............. -42,000 funds available LEMV .............. .............. -10,750 Sensors--la te to need 83 Night Vision .............. 27,000 +27,000 Devices Transfer .............. .............. +27,000 from Title III--Night Vision Devices 92 Mod of In-Svc 14,600 14,600 .............. Equip (Firefinder Radars) 99 Counterfire 54,585 298,994 +244,409 Radars Transfer .............. .............. +244,409 from Title III--Counte rfire Radars 102 Fire Support C2 22,430 22,430 .............. Family 103 Battle Command 2,400 2,400 .............. Sustainment Support System 111 Network .............. 44,921 +44,921 Management Initialization and Service Transfer .............. .............. +44,921 from Title III--Networ k Management Initializat ion and Service 112 Maneuver Control 6,400 6,400 .............. System [MCS] 113 Single Army 5,160 5,160 .............. Logistics Enterprise [SALE] 126 Family of Non- 15,000 15,000 .............. Lethal Equipment [FNLE] 127 Base Defense 66,100 66,100 .............. Systems [BDS] 134 Robotic Combat .............. 29,106 +29,106 Support System [RCSS] Transfer .............. .............. +29,106 from Title III--Roboti c Combat Support System [RCSS] 135 Explosive 3,565 3,565 .............. Ordnance Disposal Eqpmt [EOD EQPMT] 138 Heaters and .............. 12,210 +12,210 ECU'S Transfer .............. .............. +12,210 from Title III--Heater s and ECUs 143 Force Provider 39,700 39,700 .............. 145 Cargo Aerial Del 650 650 .............. and Personnel Parachute System 149 Distribution 2,119 2,119 .............. Systems, Petroleum and Water 152 Mobile 428 428 .............. Maintenance Equipment Systems 153 Items Less Than 30 30 .............. $5 Million (MAINT EQ) 171 Generators and .............. 60,302 +60,302 Associated Equipment Transfer .............. .............. +60,302 from Title III--Genera tors and Associated Equipment 175 Combat Training 7,000 7,000 .............. Centers Support 176 Training 27,250 27,250 .............. Devices, Nonsystem 178 Aviation 1,000 1,000 .............. Combined Arms Tactical Trainer 179 Gaming 5,900 5,900 .............. Technology In Support of Army Training 183 Rapid Equipping 98,167 133,245 +35,078 Soldier Support Equipment Transfer .............. .............. +5,078 from Title III--Rapid Equipping Soldier Support Equipment Authorizatio .............. .............. +30,000 n increase for Solar power units ------------------------------------------------- Total, 2,015,907 2,284,190 +268,283 Other Procureme nt, Army ------------------------------------------------------------------------ Aircraft Procurement, Navy Appropriations, 2012.................................... $480,935,000 Budget estimate, 2013................................... 164,582,000 House allowance......................................... 146,277,000 Committee recommendation................................ 426,436,000 The Committee recommends an appropriation of $426,436,000. This is $261,854,000 above the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ 11 H-1 Upgrades [UH- 29,800 55,400 +25,600 1Y/AH-1Z] Replace .............. .............. +25,600 operational loss 23 KC-130J .............. 72,021 +72,021 Transfer .............. .............. +40,892 from Title III Procurement , Marine Corps line 5--one KC- 130J Transfer .............. .............. +31,129 from Title IX Procurement , Marine Corps line 5--one KC- 130J 30 AV-8 Series 42,238 39,638 -2,600 Litening Pod .............. .............. -2,600 Other Support cost growth 32 F-18 Series 41,243 41,243 .............. 35 H-53 Series 15,870 15,870 .............. 38 EP-3 Series 13,030 13,030 .............. 43 C-130 Series 16,737 16,737 .............. 45 Cargo/Transport .............. 10,000 +10,000 A/C Series Transfer .............. .............. +10,000 from Title III--Cargo/ Transport Aircraft Series 48 Special Project 2,714 15,135 +12,421 Aircraft Transfer .............. .............. +12,421 from Title III--Specia l Project Aircraft 53 Common ECM .............. 32,855 +32,855 Equipment Transfer .............. .............. +32,855 from Title III--Direct ed Infrared Countermeas ures 54 Common Avionics 570 570 .............. Changes 55 Common Defensive .............. 18,850 +18,850 Weapon System Transfer .............. .............. +18,850 from Title III--Blue Force Situational Awareness 59 RQ-7 Series .............. 49,324 +49,324 Transfer .............. .............. +49,324 from Title III--Retrof its 62 Common Ground 2,380 2,380 .............. Equipment 64 War Consumables .............. 43,383 +43,383 Transfer .............. .............. +43,383 from Title III--War Consumables ------------------------------------------------- Total, 164,582 426,436 +261,854 Aircraft Procureme nt, Navy ------------------------------------------------------------------------ Weapons Procurement, Navy Appropriations, 2012.................................... $41,070,000 Budget estimate, 2013................................... 23,500,000 House allowance......................................... 22,500,000 Committee recommendation................................ 23,500,000 The Committee recommends an appropriation of $23,500,000. This is equal to the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ 9 Hellfire 17,000 17,000 .............. 10 Stand off 6,500 6,500 .............. Precision Guided Munitions [SOPGM] ------------------------------------------------- Total, 23,500 23,500 .............. Weapons Procureme nt, Navy ------------------------------------------------------------------------ Procurement of Ammunition, Navy and Marine Corps Appropriations, 2012.................................... $317,100,000 Budget estimate, 2013................................... 285,747,000 House allowance......................................... 284,450,000 Committee recommendation................................ 284,356,000 The Committee recommends an appropriation of $284,356,000. This is $1,391,000 below the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ 1 General Purpose 18,000 18,000 .............. Bombs 2 Airborne 80,200 80,200 .............. Rockets, All Types 3 Machine Gun 21,500 21,500 .............. Ammunition 6 Air Expendable 20,303 20,303 .............. Countermeasures 11 Other Ship Gun 532 532 .............. Ammunition 12 Small Arms and 2,643 2,643 .............. Landing Party Ammo 13 Pyrotechnic and 2,322 2,322 .............. Demolition 14 Ammunition Less 6,308 6,308 .............. Than $5,000,000 15 Small Arms 10,948 10,948 .............. Ammunition 16 Linear Charges, 9,940 9,940 .............. All Types 17 40mm, All Types 5,963 5,963 .............. 20 120mm, All Types 11,605 11,605 .............. 21 Ctg 25mm, All 2,831 2,831 .............. Types 22 Grenades, All 2,359 2,359 .............. Types 23 Rockets, All 3,051 3,051 .............. Types 24 Artillery, All 54,886 54,886 .............. Types 25 Demolition 1,391 .............. -1,391 Munitions, All Types Prior year .............. .............. -1,391 funds available 26 Fuze, All Types 30,945 30,945 .............. 27 Non Lethals 8 8 .............. 29 Items Less Than 12 12 .............. $5,000,000 ------------------------------------------------- TOTAL 285,747 284,356 -1,391 ------------------------------------------------------------------------ Other Procurement, Navy Appropriations, 2012.................................... $236,125,000 Budget estimate, 2013................................... 98,882,000 House allowance......................................... 98,882,000 Committee recommendation................................ 98,882,000 The Committee recommends an appropriation of $98,882,000. This is equal to the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ 70 Tactical/Mobile 3,603 3,603 .............. C4I Systems 97 Expeditionary 58,200 58,200 .............. Airfields 127 Passenger 3,901 3,901 .............. Carrying Vehicles 128 General Purpose 852 852 .............. Trucks 129 Construction and 2,436 2,436 .............. Maintenance Equipment 130 Fire-fighting 3,798 3,798 .............. Equipment 131 Tactical 13,394 13,394 .............. Vehicles 134 Items Under 375 375 .............. $5,000,000 149 C4ISR Equipment 3,000 3,000 .............. 151 Physical 9,323 9,323 .............. Security Equipment ------------------------------------------------- TOTAL, 98,882 98,882 .............. OTHER PROCURMEN T, NAVY ------------------------------------------------------------------------ Procurement, Marine Corps Appropriations, 2012.................................... $1,233,996,000 Budget estimate, 2013................................... 943,683,000 House allowance......................................... 943,683,000 Committee recommendation................................ 865,977,000 The Committee recommends an appropriation of $865,977,000. This is $77,706,000 below the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ 2 LAV PIP 10,000 10,000 .............. 5 High Mobility 108,860 77,731 -31,129 Artillery Rocket System Marine Corps .............. .............. -31,129 Requested Transfer to Title IX: Aircraft Procurement , Navy 6 Weapons and .............. 11,124 +11,124 combat vehicles under $5,000,000 Transfer .............. .............. +11,124 from Title III 10 Javelin 29,158 28,384 -774 Unit Cost .............. .............. -774 Efficiencie s 13 Modification 41,602 41,602 .............. Kits 15 Repair and Test 13,632 13,632 .............. Equipment 17 Modification 2,831 2,831 .............. Kits 19 Air Operations 15,575 15,575 .............. C2 Systems 20 Radar Systems 8,015 8,015 .............. 23 Intelligence 35,310 35,310 .............. Support Equipment 29 Night Vision 652 652 .............. Equipment 30 Common Computer 19,807 19,807 .............. Resources 32 Radio Systems 36,482 36,482 .............. 33 Comm Switching 41,295 41,295 .............. and Control Systems 39 Medium Tactical 10,466 10,466 .............. Vehicle Replacement 40 Logistics .............. 3,300 +3,300 Vehicle System Rep Transfer .............. .............. +3,300 from Title III 41 Family of 7,642 7,642 .............. Tactical Trailers 45 Bulk Liquid 18,239 18,239 .............. Equipment 46 Tactical Fuel 51,359 51,359 .............. Systems 47 Power Equipment 20,247 50,020 +29,773 Assorted APSCE and .............. .............. +29,773 MEPDIS-R Transfer from Title III 49 EOD Systems 362,658 272,658 -90,000 JCREW 3.3 .............. .............. -90,000 Contract Award Delay 50 Physical 55,500 55,500 .............. Security Equipment 52 Material 19,100 19,100 .............. Handling Equipment 54 Field Medical 15,751 15,751 .............. Equipment 55 Training Devices 3,602 3,602 .............. 57 Family of 15,900 15,900 .............. Construction Equipment ------------------------------------------------- Total, 943,683 865,977 -77,706 Procureme nt Marine Corps ------------------------------------------------------------------------ Aircraft Procurement, Air Force Appropriations, 2012.................................... $1,235,777,000 Budget estimate, 2013................................... 305,600,000 House allowance......................................... 305,600,000 Committee recommendation................................ 395,327,000 The Committee recommends an appropriation of $395,327,000. This is $89,727,000 above the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ 35 Large Aircraft 139,800 139,800 .............. Infrared Countermeasures 55 U-2 Mods 46,800 46,800 .............. 63 C-130 11,400 11,400 .............. 67 Compass Call 14,000 14,000 .............. Mods 68 RC-135 8,000 8,000 .............. 75 HC/MC-130 4,700 4,700 .............. Modifications 81 Initial Spares/ 21,900 21,900 .............. Repair Parts 98 War consumables .............. 89,727 +89,727 Transfer .............. .............. +89,727 from Title III 99 Other Production 59,000 59,000 .............. Charges ------------------------------------------------- Total, 305,600 395,327 +89,727 Aircraft Procureme nt, Air Force ------------------------------------------------------------------------ Missile Procurement, Air Force Appropriations, 2012.................................... $41,220,000 Budget estimate, 2013................................... 34,350,000 House allowance......................................... 34,350,000 Committee recommendation................................ 34,350,000 The Committee recommends an appropriation of $34,350,000. This is equal to the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ 5 Predator 34,350 34,350 .............. Hellfire Missile ------------------------------------------------- Total, 34,350 34,350 .............. Missile Procureme nt, Air Force ------------------------------------------------------------------------ Procurement of Ammunition, Air Force Appropriations, 2012.................................... $109,010,000 Budget estimate, 2013................................... 116,203,000 House allowance......................................... 116,203,000 Committee recommendation................................ 116,203,000 The Committee recommends an appropriation of $116,203,000. This is equal to the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ 2 Cartridges 13,592 13,592 .............. 4 General Purpose 23,211 23,211 .............. Bombs 5 Joint Direct 53,923 53,923 .............. Attack Munition 6 Cad/Pad 2,638 2,638 .............. 10 Items Less Than 2,600 2,600 .............. $5,000,000 11 Flares 11,726 11,726 .............. 12 Fuzes 8,513 8,513 .............. ------------------------------------------------- TOTAL 116,203 116,203 .............. ------------------------------------------------------------------------ Other Procurement, Air Force Appropriations, 2012.................................... $3,088,510,000 Budget estimate, 2013................................... 2,818,270,000 House allowance......................................... 2,785,170,000 Committee recommendation................................ 2,684,470,000 The Committee recommends an appropriation of $2,684,470,000. This is $133,800,000 below the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ 2 Medium Tactical 2,010 2,010 .............. Vehicle 4 Items Less Than 2,675 2,675 .............. $5 Million 6 Items Less Than 2,557 2,557 .............. $5 Million 8 Items Less Than 4,329 4,329 .............. $5 Million 9 Runway Snow 984 984 .............. Removal and Cleaning Equ 10 Items Less Than 9,120 9,120 .............. $5 Million 22 Weather 5,600 5,600 .............. Observation Forecast 27 General 11,157 11,157 .............. Information Technology 49 Tactical C-E 7,000 7,000 .............. Equipment 53 Base Comm 10,654 10,654 .............. Infrastructure 54 Comm Elect Mods 8,000 8,000 .............. 55 Night Vision 902 902 .............. Goggles 59 Contingency 60,090 43,190 -16,900 Operations JCREW LRIP .............. .............. -16,900 Delay 62 Mobility 9,400 9,400 .............. Equipment 63 Items Less Than 9,175 9,175 .............. $5 Million Classified 2,672,317 2,555,417 -116,900 Programs Classified .............. .............. -116,900 Adjustment 71 Spares and 2,300 2,300 .............. Repair Parts ------------------------------------------------- TOTAL, 2,818,270 2,684,470 -133,800 OTHER PROCUREME NT, AIR FORCE ------------------------------------------------------------------------ Procurement, Defense-Wide Appropriations, 2012.................................... $405,768,000 Budget estimate, 2013................................... 196,349,000 House allowance......................................... 217,849,000 Committee recommendation................................ 362,749,000 The Committee recommends an appropriation of $362,749,000. This is $166,400,000 above the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ 15 Teleport Program 5,260 5,260 .............. 51 U-28 .............. 46,600 +46,600 SOCOM .............. .............. +46,600 identified shortfall for U-28 HD FMV 55 MQ-1 Unmanned .............. 23,000 +23,000 Aerial Vehicle SOCOM .............. .............. +23,000 identified shortfall for MQ-1 HD FMV 56 MQ-9 Unmanned .............. 59,400 +59,400 Aerial Vehicle MQ-9 battle .............. .............. +24,000 loss replacement s SOCOM .............. .............. +35,400 identified shortfall for MQ-9 HD FMV 61 MQ-8 UAV 16,500 16,500 .............. 68 Communications 151 4,051 +3,900 Equipment and Electronics SOCOM .............. .............. +3,900 identified shortfall for HD FMV (Com Equip and electronics ) 69 Intelligence 30,528 30,528 .............. Systems 71 Distributed .............. 3,200 +3,200 Common Ground/ Surface Systems SOCOM .............. .............. +3,200 identified shortfall for DCGS-- HD FMV 77 Tactical 1,843 1,843 .............. Vehicles 78 Mission Training .............. 5,000 +5,000 and Preparation Systems SOCOM .............. .............. +5,000 identified shortfall for HD FMV (Training and Prep systems) 82 Automation 1,000 1,000 .............. Systems 86 Visual 108 108 .............. Augmentation Lasers and Sensor Systems 91 Operational 14,758 40,058 +25,300 Enhancements SOCOM .............. .............. +25,300 identified shortfall for HD FMV (SOF Operational enhancement s) Classified 126,201 126,201 .............. Programs ------------------------------------------------- TOTAL, 196,349 362,749 +166,400 PROCUREME NT DEFENSE- WIDE ------------------------------------------------------------------------ National Guard and Reserve Equipment Appropriations, 2012.................................... $1,000,000,000 Budget estimate, 2013................................................... House allowance......................................................... Committee recommendation................................ 1,000,000,000 The Committee recommends an appropriation of $1,000,000,000. This is $1,000,000,000 above the budget estimate. The appropriation includes direction for each Reserve and National Guard component commander to submit to the congressional defense committees a detailed assessment of that component's modernization priorities, not later than 30 days after enactment of this act. committee recommended program The following table summarizes the budget estimate for this appropriation, the Committee recommendation, and the Committee recommended adjustments to the budget estimate: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ NATIONAL GUARD AND RESERVE EQUIPMENT RESERVE EQUIPMENT ARMY RESERVE: Miscellaneous .............. 160,000 +160,000 Equipment NAVY RESERVE: Miscellaneous .............. 100,000 +100,000 Equipment MARINE CORPS RESERVE: Miscellaneous .............. 100,000 +100,000 Equipment AIR FORCE RESERVE: Miscellaneous .............. 100,000 +100,000 Equipment ------------------------------------------------- TOTAL, .............. 460,000 +460,000 RESERVE EQUIPMENT ================================================= NATIONAL GUARD EQUIPMENT ARMY NATIONAL GUARD: Miscellaneous .............. 300,000 +300,000 Equipment AIR NATIONAL GUARD: Miscellaneous .............. 240,000 +240,000 Equipment ------------------------------------------------- TOTAL, .............. 540,000 +540,000 NATIONAL GUARD EQUIPMENT ================================================= TOTAL, .............. 1,000,000 +1,000,000 NATIONAL GUARD AND RESERVE EQUIPMENT ------------------------------------------------------------------------ Unobligated Balances.--The Committee remains concerned about the obligation rates for the Navy Reserve, Marine Corps Reserve, and Air Force Reserve and urges these components to improve management of this account. High-Priority Items.--The Committee directs that the National Guard and Reserve Equipment Account shall be executed by the Chiefs of the National Guard and Reserve components with priority consideration given to the following items: A-10 Situation Awareness Upgrade; ARC 210 Radios for ANG F-16s; Arctic Search and Rescue Package; Armory-Based Individual and Unstabilized Gunnery Trainers; Batteries and Battery Support Equipment; Bradley Modifications; C-130 Crash-Resistant Loadmaster Seat; C-130 Secure Line-of-Sight [SLOS] Beyond Line- of-Sight [BLOS] Capability; C-130/KC-135 Real Time Information in Cockpit [RTIC] Data Link; CH-47 Door Gun Mounts; Combat Mobility Equipment; Combined Arms Virtual Trainers; F-15 AESA Radars; Field Engineering, Logistics, Maintenance, and Security Equipment; Force Protection Equipment; Generation 4 Advanced Targeting Pods; HC-130 Forward Area Refueling Point; Helicopter Firefighting Equipment; Helmet-Mounted Cueing System; HMMWV Recapitalization; In-Flight Propeller Balancing System; Internal and External Auxiliary Fuel Tanks for Apaches and Chinooks; Joint Threat Emitters; Large Aircraft Infrared Countermeasures [LAIRCM]; Light Utility Helicopters; Modular Airborne Firefighting System II; Modular Small Arms Training Systems; MRAP Vehicle Virtual Trainers; Naval Construction Force Tactical Vehicles and Support Equipment; Reactive Skin Decontamination Lotion; SATCOM Ground Stations; Simulation Training Systems; Support Wide Area Network [SWAN] D V3/MRT Packages; Targeting Pod Upgrades; Thermal Imaging Systems; Ultra-Light Tactical Vehicles; Unit Maintenance Aerial Recovery Kits; Virtual Convoy Operations Trainers; and Virtual Door Gunner Trainers. RESEARCH, DEVELOPMENT, TEST AND EVALUATION The Committee recommends $260,413,000 for research, development, test and evaluation. Research, Development, Test and Evaluation, Army Appropriations, 2012.................................... $18,513,000 Budget estimate, 2013................................... 19,860,000 House allowance......................................... 14,860,000 Committee recommendation................................ 42,357,000 The Committee recommends an appropriation of $42,357,000. This is $22,497,000 above the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ 60 Soldier Support 19,860 9,860 -10,000 and Survivability Program .............. .............. -10,000 adjustment 78 Endurance UAVs .............. 20,197 +20,197 Transfer .............. .............. +20,197 from Title IV: LEMV Military Utility Assessment in theater 79 Aircraft .............. 12,300 +12,300 Avionics Transfer .............. .............. +12,300 from Title IV: DVE ONS ------------------------------------------------- Total, 19,860 42,357 +22,497 Research, Developme nt, Test and Evaluatio n, Army ------------------------------------------------------------------------ Research, Development, Test and Evaluation, Navy Appropriations, 2012.................................... $53,884,000 Budget estimate, 2013................................... 60,119,000 House allowance......................................... 60,119,000 Committee recommendation................................ 52,519,000 The Committee recommends an appropriation of $52,519,000. This is $7,600,000 below the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ 56 Joint Service 4,600 4,600 .............. Explosive Ordnance Development 131 Medical 2,173 2,173 .............. Development 160 Navy Space and 5,200 5,200 .............. Electronic Warfare [SEW] Support 195 Marine Corps 6,762 6,762 .............. Combat Services Support 221 RQ-7 UAV 7,600 .............. -7,600 Undefined .............. .............. -7,600 weapons capability Classified 33,784 33,784 .............. programs ------------------------------------------------- Total, 60,119 52,519 -7,600 Research, Developme nt, Test and Evaluatio n, Navy ------------------------------------------------------------------------ Research, Development, Test and Evaluation, Air Force Appropriations, 2012.................................... $259,600,000 Budget estimate, 2013................................... 53,150,000 House allowance......................................... 53,150,000 Committee recommendation................................ 53,150,000 The Committee recommends an appropriation of $53,150,000. This is equal to the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ Classified 53,150 53,150 .............. programs ------------------------------------------------- Total, 53,150 53,150 .............. Research, Developme nt, Test and Evaluatio n, Air Force ------------------------------------------------------------------------ Research, Development, Test and Evaluation, Defense-Wide Appropriations, 2012.................................... $194,361,000 Budget estimate, 2013................................... 112,387,000 House allowance......................................... 107,387,000 Committee recommendation................................ 112,387,000 The Committee recommends an appropriation of $112,387,000. This is equal to the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ 239 MQ-8 UAV 5,000 5,000 .............. Classified 107,387 107,387 .............. programs ------------------------------------------------- Total, 112,387 112,387 .............. Research, Developme nt, Test and Evaluatio n, Defense- Wide ------------------------------------------------------------------------ REVOLVING AND MANAGEMENT FUNDS Defense Working Capital Funds Appropriations, 2012.................................... $435,013,000 Budget estimate, 2013................................... 503,364,000 House allowance......................................... 293,600,000 Committee recommendation................................ 1,467,864,000 The Committee recommends an appropriation of $1,467,864,000. This is $964,500,000 above the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the programs recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ Prepositioned 42,600 42,600 .............. War Reserve Stocks ------------------------------------------------- Total, 42,600 42,600 .............. Defense Working Capital Fund, Army ================================================= C-17 CLS Engine 230,400 230,400 .............. Repair Transportation 10,000 10,000 .............. Fallen Heroes ------------------------------------------------- Total, 240,400 240,400 .............. Defense Working Capital Fund, Air Force ================================================= Defense 220,364 1,184,864 +964,500 Logistics Agency Mitigation .............. .............. +964,500 of Projected Fiscal Year 2013 Shortfall for Fuel and Second Destination Transportat ion ------------------------------------------------- Total, 220,364 1,184,864 +964,500 Defense Working Capital Fund, Defense- wide ================================================= Grand 503,364 1,467,864 +964,500 Total, Defense Working Capital Funds ------------------------------------------------------------------------ OTHER DEPARTMENT OF DEFENSE PROGRAMS Defense Health Program Appropriations, 2012.................................... $1,228,288,000 Budget estimate, 2013................................... 993,898,000 House allowance......................................... 1,003,898,000 Committee recommendation................................ 993,898,000 The Committee recommends an appropriation of $993,898,000. This is equal to the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ OPERATION AND 993,898 993,898 .............. MAINTENANCE IN-HOUSE 483,326 483,326 .............. CARE PRIVATE 376,982 376,982 .............. SECTOR CARE CONSOLIDATED 111,675 111,675 .............. HEALTH CARE INFORMATION 4,773 4,773 .............. MANAGEMENT/ IT MANAGEMENT 660 660 .............. HEADQUARTER S EDUCATION 15,370 15,370 .............. AND TRAINING BASE 1,112 1,112 .............. OPERATIONS AND COMMUNICATI ONS ------------------------------------------------------------------------ Drug Interdiction and Counter-Drug Activities, Defense Appropriations, 2012.................................... $456,458,000 Budget estimate, 2013................................... 469,025,000 House allowance......................................... 469,025,000 Committee recommendation................................ 469,025,000 The Committee recommends an appropriation of $469,025,000. This is equal to the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ 010 Drug 469,025 469,025 .............. Interdiction and Counter- Drug Activities, Defense ------------------------------------------------- TOTAL, 469,025 469,025 .............. DRUG INTERDICT ION AND COUNTER-D RUG ACTIVITIE S, DEFENSE ------------------------------------------------------------------------ Joint Improvised Explosive Device Defeat Fund Appropriations, 2012.................................... $2,441,984,000 Budget estimate, 2013................................... 1,675,400,000 House allowance......................................... 1,614,900,000 Committee recommendation................................ 1,514,114,000 The Committee recommends an appropriation of $1,514,114,000. This is $161,286,000 below the budget estimate. COMMITTEE RECOMMENDED PROGRAM The following table details the program recommended by the Committee: [In thousands of dollars] ------------------------------------------------------------------------ Change from Line Item 2013 budget Committee budget estimate recommendation estimate ------------------------------------------------------------------------ 1 ATTACK THE 950,500 784,500 -166,000 NETWORK Biometric .............. .............. -22,000 ID--Transfe r to Operation and Maintenance Army line 432 Integrated .............. .............. -23,000 supply chain--dupl ication of mission Falcon--Tran .............. .............. -48,000 sfer to Operation and Maintenance Army line 135 Sand Dragon-- .............. .............. -40,000 excess sustainment funds and program delays TEDAC--exces .............. .............. -33,000 s prior year carryover funding 2 DEFEAT THE 400,000 307,800 -92,200 DEVICE ALARM--exces .............. .............. -4,700 s to need 3-Band Long .............. .............. -2,000 Wave infrared camera early to need Remote .............. .............. -85,500 Mounted Detection System--JIE DDO discontinue d efforts 3 TRAIN THE FORCE 149,500 119,000 -30,500 Intelligence .............. .............. -28,500 surveillanc e and reconnaissa nce emulation and trainer early to need Dismounted .............. .............. -2,000 Virtual Simulators- -undefined unit cost increase 4 STAFF AND 175,400 302,814 +127,414 INFRASTRUCTURE Transfer .............. .............. +227,414 from Title VI: Staff and Infrastruct ure Forward .............. .............. -100,000 financed from previous years ------------------------------------------------- Total, 1,675,400 1,514,114 -161,286 JIEDDO ------------------------------------------------------------------------ Joint Improvised Explosive Device Defeat Organization.--The Joint Improvised Explosive Device Defeat Organization [JIEDDO] continues to support a vital mission in protecting our troops from improvised explosive devices. The fiscal year 2013 budget includes $227,414,000 for base funding, which the Committee recommends transferring to title IX as these requirements are war-related and should be funded through Overseas Contingency Operations [OCO] funding. The fiscal year 2013 request also includes $1,675,400,000 in OCO funds. The Committee directs the Deputy Secretary of Defense to submit to the congressional defense committees a quarterly commitment, obligation, and expenditure data by line of operation, by year of appropriation, and by program. The Committee also directs JIEDDO to follow standard Department of Defense reprogramming procedures when transferring a cumulative amount of $20,000,000 or 10 percent whichever is lesser between programs. In addition, all Staff and Infrastructure costs should follow DOD Operation and Maintenance fiscal standards. In addition, a February 2012 Government Accountability Office report states that ``DOD continues to lack comprehensive visibility of its counter-IED expenditures and investments, including those from JIEDDO, the military services, and relevant DOD agencies''. Therefore, the Committee directs JIEDDO to incorporate the fiscal year 2012-2016 JIEDDO strategic plan into a technology roadmap with measurable outcome-oriented goals. This technology roadmap is due to the Committee 180 days after enactment of this act. Furthermore, JIEDDO has carried large amounts of funding forward from year to year. For example, over $900,000,000 appropriated in fiscal year 2011 was carried forward into fiscal year 2012 for obligation. In fiscal year 2012, JIEDDO will carry over $500,000,000 into fiscal year 2013. The Committee is also aware that JIEDDO found alternative solutions to $87,500,000 in planned efforts. Therefore, the Committee recommends a reduction of $231,200,000 to the fiscal year 2013 request. In addition, the Committee transfers $70,000,000 to the appropriate services for execution. The Committee also concurs with the Senate Armed Services Committee recommendation to transfer the Counter-IED Operations Integration Center to the appropriate entities no later than the end of fiscal year 2013. Finally, JIEDDO is consolidating nearly one-half a million square feet of office space in the National Capital Region. The Committee directs the Deputy Secretary of Defense to conduct a business case analysis before executing the requested $20,800,000 of fiscal year 2013 facilities funding. Joint Urgent Operational Needs Fund Appropriations, 2012.................................................... Budget estimate, 2013................................... $100,000,000 House allowance......................................................... Committee recommendation................................................ The Committee recommends no funding for the Joint Urgent Operational Needs Fund. Office of the Inspector General Appropriations, 2012.................................... $11,055,000 Budget estimate, 2013................................... 10,766,000 House allowance......................................... 10,766,000 Committee recommendation................................ 10,766,000 The Committee recommends an appropriation of $10,766,000. This is equal to the budget estimate. GENERAL PROVISIONS--THIS TITLE Sec. 9001. Provides that funds made available in this title are in addition to amounts appropriated or made available for the Department of Defense for fiscal year 2013. Sec. 9002. Provides special transfer authority of up to $4,000,000,000 of funds in this title, subject to the terms and conditions in this act. Sec. 9003. Provides the authority to obligate supervision and administration costs associated with overseas construction projects at the time the project is awarded. Sec. 9004. Provides for the procurement of motor vehicles for use by military and civilian employees of the Department of Defense in Iraq and Afghanistan. Sec. 9005. Provides authority of up to $200,000,000 of funds in this title to fund the Commander's Emergency Response Program. Sec. 9006. Provides for the use of funds to lift and sustain coalition forces supporting military and stability operations in Iraq and Afghanistan and requires quarterly reports to the congressional defense committees. Sec. 9007. Prohibits the use of funds made available in this act to establish any permanent military installation or base in Iraq or Afghanistan. Sec. 9008. Prohibits the use of funds in this act to contravene laws enacted or regulations promulgated to implement the United Nations Convention Against Torture and Other Cruel, Inhuman or Degrading Treatment or Punishment. Sec. 9009. Requires the Afghanistan Resource Oversight Council to oversee several programs in Afghanistan. Sec. 9010. Provides a Combatant Commander engaged in contingency operations overseas with the authority to use operation and maintenance funds to purchase an investment item of not more than $500,000. Sec. 9011. Provides authority for funding the Task Force for Business and Stability Operations. Sec. 9012. Provides authority for funding the activities of the Office of Security Cooperation in Iraq. Sec. 9013. Rescissions.--The Committee recommends a general provision rescinding funds from prior years as displayed below: ------------------------------------------------------------------------ Amount ------------------------------------------------------------------------ 2012 Overseas Contingency Operations Appropriations Other Procurement, Army: Gunshot Detection System............................ $10,100,000 Base Support Communications......................... 5,000,000 Sense Through The Wall.............................. 10,000,000 Installation Info Infrastructure Mod Program........ 125,500,000 Knight Family....................................... 42,000,000 Tactical Bridging................................... 15,000,000 Mine Resistant Ambush Protected Vehicle Fund: Excess Carryover.................................... 400,000,000 Research, Development, Test and Evaluation, Air Force: Endurance Unmanned Aerial Vehicles--Blue Devil...... 58,000,000 Afghanistan Security Forces Fund: CENTCOM Revised Requirement......................... 1,000,000,000 Joint Improvised Explosive Device Defeat Fund ALARM............................................... 19,300,000 Integrated Supply Chain............................. 21,000,000 ------------------------------------------------------------------------ COMPLIANCE WITH PARAGRAPH 7, RULE XVI OF THE STANDING RULES OF THE SENATE Paragraph 7 of rule XVI requires that Committee reports on general appropriations bills identify each Committee amendment to the House bill ``which proposes an item of appropriation which is not made to carry out the provisions of an existing law, a treaty stipulation, or an act or resolution previously passed by the Senate during that session.'' The Committee recommends funding for the following accounts which currently lack authorization for fiscal year 2013: Military Personnel, Army Military Personnel, Navy Military Personnel, Marine Corps Military Personnel, Air Force Reserve Personnel, Army Reserve Personnel, Navy Reserve Personnel, Marine Corps Reserve Personnel, Air Force National Guard Personnel, Army National Guard Personnel, Air Force Operation and Maintenance, Army Operation and Maintenance, Navy Operation and Maintenance, Marine Corps Operation and Maintenance, Air Force Operation and Maintenance, Defense-Wide Operation and Maintenance, Army Reserve Operation and Maintenance, Navy Reserve Operation and Maintenance, Marine Corps Reserve Operation and Maintenance, Air Force Reserve Operation and Maintenance, Army National Guard Operation and Maintenance, Air National Guard United States Court of Appeals for the Armed Forces Environmental Restoration, Army Environmental Restoration, Navy Environmental Restoration, Air Force Environmental Restoration, Defense-Wide Environmental Restoration, Formerly Used Defense Sites Overseas Humanitarian, Disaster, and Civic Aid Cooperative Threat Reduction Account Department of Defense Acquisition Workforce Development Fund Afghanistan Security Forces Fund Afghanistan Infrastructure Fund Aircraft Procurement, Army Missile Procurement, Army Procurement of Weapons and Tracked Combat Vehicles, Army Procurement of Ammunition, Army Other Procurement, Army Aircraft Procurement, Navy Weapons Procurement, Navy Procurement of Ammunition, Navy and Marine Corps Shipbuilding and Conversion, Navy Carrier Replacement Program Virginia Class Submarine Virginia Class Submarine [AP] CVN Refueling Overhaul CVN Refueling Overhauls [AP] DDG-1000 Program DDG-51 Destroyer DDG-51 Destroyer [AP] Littoral Combat Ship LPD-17 [AP] Joint High Speed Vessel Moored Training Ship LCAC Service Life Extension Program Outfitting, Post Delivery, Conversions and First Destination Transportation Completion of Prior Year Shipbuilding Programs Other Procurement, Navy Procurement, Marine Corps Aircraft Procurement, Air Force Missile Procurement, Air Force Procurement of Ammunition, Air Force Other Procurement, Air Force Procurement, Defense-Wide National Guard and Reserve Equipment Research, Development, Test and Evaluation, Army Research, Development, Test and Evaluation, Navy Research, Development, Test and Evaluation, Air Force Research, Development, Test and Evaluation, Defense-Wide Operational Test and Evaluation, Defense Defense Working Capital Funds National Defense Sealift Fund Defense Health Program Chemical Agents and Munitions Destruction, Defense Drug Interdiction and Counter-Drug Activities, Defense Joint Improvised Explosive Device Defeat Fund Office of the Inspector General Central Intelligence Agency Retirement and Disability System Fund Intelligence Community Management Account Ship Modernization, Operations and Sustainment Fund COMPLIANCE WITH PARAGRAPH 7(c), RULE XXVI OF THE STANDING RULES OF THE SENATE Pursuant to paragraph 7(c) of rule XXVI, on August 2, 2012, the Committee ordered favorably a bill (H.R. 5856) making appropriations for the Department of Defense for the fiscal year ending September 30, 2013, and for other purposes, with an amendment in the nature of a substitute, provided, that the bill be subject to further amendment and that the bill be consistent with its spending allocations, by a recorded vote of 30-0, a quorum being present. The vote was as follows: Yeas Nays Chairman Inouye Mr. Leahy Mr. Harkin Ms. Mikulski Mr. Kohl Mrs. Murray Mrs. Feinstein Mr. Durbin Mr. Johnson (SD) Ms. Landrieu Mr. Reed Mr. Lautenberg Mr. Nelson Mr. Pryor Mr. Tester Mr. Brown Mr. Cochran Mr. McConnell Mr. Shelby Mrs. Hutchison Mr. Alexander Ms. Collins Ms. Murkowski Mr. Graham Mr. Kirk Mr. Coats Mr. Blunt Mr. Moran Mr. Hoeven Mr. Johnson (WI) COMPLIANCE WITH PARAGRAPH 12, RULE XXVI OF THE STANDING RULES OF THE SENATE Paragraph 12 of rule XXVI requires that Committee reports on a bill or joint resolution repealing or amending any statute or part of any statute include ``(a) the text of the statute or part thereof which is proposed to be repealed; and (b) a comparative print of that part of the bill or joint resolution making the amendment and of the statute or part thereof proposed to be amended, showing by stricken-through type and italics, parallel columns, or other appropriate typographical devices the omissions and insertions which would be made by the bill or joint resolution if enacted in the form recommended by the Committee.'' The Committee bill as recommended contains no such provisions. BUDGETARY IMPACT OF BILL PREPARED IN CONSULTATION WITH THE CONGRESSIONAL BUDGET OFFICE PURSUANT TO SEC. 308(a), PUBLIC LAW 93-344, AS AMENDED [In millions of dollars] ---------------------------------------------------------------------------------------------------------------- Budget authority Outlays --------------------------------------------------- Committee Amount in Committee Amount in allocation bill allocation bill ---------------------------------------------------------------------------------------------------------------- Comparison of amounts in the bill with Committee allocations to its subcommittees of amounts in the budget resolution for 2013: Subcommittee on Defense: Mandatory............................................... 514 514 514 \1\514 Discretionary........................................... 511,161 604,712 168,600 \1\620,721 Security............................................ 510,907 604,458 NA NA Nonsecurity......................................... 254 254 NA NA Projections of outlays associated with the recommendation: 2013.................................................... ........... ........... ........... \2\382,121 2014.................................................... ........... ........... ........... 139,037 2015.................................................... ........... ........... ........... 47,466 2016.................................................... ........... ........... ........... 19,126 2017 and future years................................... ........... ........... ........... 12,929 Financial assistance to State and local governments for NA ........... NA ........... 2013....................................................... ---------------------------------------------------------------------------------------------------------------- \1\Includes outlays from prior-year budget authority. \2\Excludes outlays from prior-year budget authority. NA: Not applicable. Consistent with the funding recommended in the bill for overseas contingency operations and in accordance with section 251(b)(2)(A) of the BBEDCA and section 106 of the Deficit Control Act of 2011, the Committee anticipates that the Budget Committee will file a revised section 302(a) allocation for the Committee on Appropriations reflecting an upward adjustment of $93,296,796,000 in budget authority plus associated outlays. COMPARATIVE STATEMENT OF NEW BUDGET (OBLIGATIONAL) AUTHORITY FOR FISCAL YEAR 2012 AND BUDGET ESTIMATES AND AMOUNTS RECOMMENDED IN THE BILL FOR FISCAL YEAR 2013 [In thousands of dollars] ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Senate Committee recommendation compared with (+ or -) Item 2012 Budget estimate House allowance Committee -------------------------------------------------- appropriation recommendation 2012 appropriation Budget estimate House allowance ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ TITLE I MILITARY PERSONNEL Military Personnel, Army................................................. 43,298,409 40,777,844 40,730,014 40,157,392 -3,141,017 -620,452 -572,622 Military Personnel, Navy................................................. 26,803,334 27,090,893 27,075,933 26,989,384 +186,050 -101,509 -86,549 Military Personnel, Marine Corps......................................... 13,635,136 12,481,050 12,560,999 12,529,469 -1,105,667 +48,419 -31,530 Military Personnel, Air Force............................................ 28,096,708 28,048,539 28,124,109 28,053,829 -42,879 +5,290 -70,280 Reserve Personnel, Army.................................................. 4,289,407 4,513,753 4,456,823 4,341,823 +52,416 -171,930 -115,000 Reserve Personnel, Navy.................................................. 1,935,544 1,898,668 1,871,688 1,875,598 -59,946 -23,070 +3,910 Reserve Personnel, Marine Corps.......................................... 644,722 664,641 651,861 659,621 +14,899 -5,020 +7,760 Reserve Personnel, Air Force............................................. 1,712,705 1,741,365 1,743,875 1,728,505 +15,800 -12,860 -15,370 National Guard Personnel, Army........................................... 7,585,645 8,103,207 8,089,477 8,005,077 +419,432 -98,130 -84,400 National Guard Personnel, Air Force...................................... 3,088,929 3,110,065 3,158,015 3,161,765 +72,836 +51,700 +3,750 ---------------------------------------------------------------------------------------------------------------------- Total, title I, Military Personnel................................. 131,090,539 128,430,025 128,462,794 127,502,463 -3,588,076 -927,562 -960,331 ====================================================================================================================== TITLE II OPERATION AND MAINTENANCE Operation and Maintenance, Army.......................................... 31,072,902 36,608,592 36,422,738 33,804,145 +2,731,243 -2,804,447 -2,618,593 Operation and Maintenance, Navy.......................................... 38,120,821 41,606,943 41,463,773 40,479,556 +2,358,735 -1,127,387 -984,217 Operation and Maintenance, Marine Corps.................................. 5,542,937 5,983,163 6,075,667 5,894,963 +352,026 -88,200 -180,704 Operation and Maintenance, Air Force..................................... 34,985,486 35,435,360 35,384,795 34,983,793 -1,693 -451,567 -401,002 Operation and Maintenance, Defense-Wide.................................. 30,152,008 31,993,013 31,740,813 31,331,839 +1,179,831 -661,174 -408,974 Operation and Maintenance, Army Reserve.................................. 3,071,733 3,162,008 3,199,423 3,140,508 +68,775 -21,500 -58,915 Operation and Maintenance, Navy Reserve.................................. 1,305,134 1,246,982 1,256,347 1,246,982 -58,152 ............... -9,365 Operation and Maintenance, Marine Corps Reserve.......................... 271,443 272,285 277,377 272,285 +842 ............... -5,092 Operation and Maintenance, Air Force Reserve............................. 3,274,359 3,166,482 3,362,041 3,227,382 -46,977 +60,900 -134,659 Operation and Maintenance, Army National Guard........................... 6,924,932 7,108,612 7,187,731 7,075,042 +150,110 -33,570 -112,689 Operation and Maintenance, Air National Guard............................ 6,098,780 6,015,455 6,616,826 6,493,155 +394,375 +477,700 -123,671 United States Court of Appeals for the Armed Forces...................... 13,861 13,516 13,516 13,516 -345 ............... ............... Environmental Restoration, Army.......................................... 346,031 335,921 335,921 335,921 -10,110 ............... ............... Environmental Restoration, Navy.......................................... 308,668 310,594 310,594 310,594 +1,926 ............... ............... Environmental Restoration, Air Force..................................... 525,453 529,263 529,263 529,263 +3,810 ............... ............... Environmental Restoration, Defense-Wide.................................. 10,716 11,133 11,133 11,133 +417 ............... ............... Environmental Restoration, Formerly Used Defense Sites................... 326,495 237,543 237,543 287,543 -38,952 +50,000 +50,000 Overseas Humanitarian, Disaster, and Civic Aid........................... 107,662 108,759 108,759 108,759 +1,097 ............... ............... Cooperative Threat Reduction Account..................................... 508,219 519,111 519,111 519,111 +10,892 ............... ............... Department of Defense Acquisition Workforce Development Fund............. 105,501 274,198 50,198 720,000 +614,499 +445,802 +669,802 ---------------------------------------------------------------------------------------------------------------------- Total, title II, Operation and maintenance......................... 163,073,141 174,938,933 175,103,569 170,785,490 +7,712,349 -4,153,443 -4,318,079 ====================================================================================================================== TITLE III PROCUREMENT Aircraft Procurement, Army............................................... 5,360,334 5,853,729 6,115,226 5,414,061 +53,727 -439,668 -701,165 Missile Procurement, Army................................................ 1,461,223 1,302,689 1,602,689 1,429,665 -31,558 +126,976 -173,024 Procurement of Weapons and Tracked Combat Vehicles, Army................. 2,070,405 1,501,706 1,884,706 1,687,823 -382,582 +186,117 -196,883 Procurement of Ammunition, Army.......................................... 1,884,424 1,739,706 1,576,768 1,624,380 -260,044 -115,326 +47,612 Other Procurement, Army.................................................. 7,924,214 6,326,245 6,488,045 4,980,209 -2,944,005 -1,346,036 -1,507,836 Aircraft Procurement, Navy............................................... 17,675,734 17,129,296 17,518,324 16,936,358 -739,376 -192,938 -581,966 Weapons Procurement, Navy................................................ 3,224,432 3,117,578 3,072,112 3,066,919 -157,513 -50,659 -5,193 Procurement of Ammunition, Navy and Marine Corps......................... 626,848 759,539 677,243 719,154 +92,306 -40,385 +41,911 Shipbuilding and Conversion, Navy........................................ 14,919,114 13,579,845 15,236,126 15,614,855 +695,741 +2,035,010 +378,729 Other Procurement, Navy.................................................. 6,013,385 6,169,378 6,364,191 6,170,286 +156,901 +908 -193,905 Procurement, Marine Corps................................................ 1,422,570 1,622,955 1,482,081 1,334,448 -88,122 -288,507 -147,633 Aircraft Procurement, Air Force.......................................... 12,950,000 11,002,999 11,320,899 11,260,646 -1,689,354 +257,647 -60,253 Coast Guard (by transfer)............................................ (63,500) ............... ............... ............... (-63,500) ............... ............... Missile Procurement, Air Force........................................... 6,080,877 5,491,846 5,449,146 4,913,276 -1,167,601 -578,570 -535,870 Advanced Extremely High Frequency Communications Satellites, Advanced ............... 833,500 ............... ............... ............... -833,500 ............... appropriation fiscal year 2014.......................................... Advanced appropriation fiscal year 2015.............................. ............... 763,900 ............... ............... ............... -763,900 ............... Advanced appropriation fiscal year 2016.............................. ............... 708,400 ............... ............... ............... -708,400 ............... Advanced appropriation fiscal year 2017.............................. ............... 1,107,200 ............... ............... ............... -1,107,200 ............... Advanced appropriation fiscal year 2018.............................. ............... 1,013,700 ............... ............... ............... -1,013,700 ............... ---------------------------------------------------------------------------------------------------------------------- Total, Advanced appropriations..................................... ............... 4,426,700 ............... ............... ............... -4,426,700 ............... Procurement of Ammunition, Air Force..................................... 499,185 599,194 599,194 593,194 +94,009 -6,000 -6,000 Other Procurement, Air Force............................................. 17,403,564 16,720,848 16,632,575 17,008,348 -395,216 +287,500 +375,773 Procurement, Defense-Wide................................................ 4,893,428 4,187,935 4,429,335 4,692,685 -200,743 +504,750 +263,350 National Guard and Reserve Equipment..................................... ............... ............... 2,000,000 ............... ............... ............... -2,000,000 Defense Production Act Purchases......................................... 169,964 89,189 63,531 189,189 +19,225 +100,000 +125,658 ---------------------------------------------------------------------------------------------------------------------- Total, title III, Procurement...................................... 104,579,701 101,621,377 102,512,191 97,635,496 -6,944,205 -3,985,881 -4,876,695 Fiscal year 2013............................................... (104,579,701) (97,194,677) (102,512,191) (97,635,496) (-6,944,205) (+440,819) (-4,876,695) ====================================================================================================================== TITLE IV RESEARCH, DEVELOPMENT, TEST AND EVALUATION Research, Development, Test and Evaluation, Army......................... 8,745,492 8,929,415 8,593,055 8,427,588 -317,904 -501,827 -165,467 Research, Development, Test and Evaluation, Navy......................... 17,753,940 16,882,877 16,987,768 16,646,307 -1,107,633 -236,570 -341,461 Research, Development, Test and Evaluation, Air Force.................... 26,535,996 25,428,046 25,117,692 25,374,286 -1,161,710 -53,760 +256,594 Research, Development, Test and Evaluation, Defense-Wide................. 19,193,955 17,982,161 19,100,362 18,419,129 -774,826 +436,968 -681,233 Operational Test and Evaluation, Defense................................. 191,292 185,268 185,268 223,768 +32,476 +38,500 +38,500 ---------------------------------------------------------------------------------------------------------------------- Total, title IV, Research, Development, Test and Evaluation........ 72,420,675 69,407,767 69,984,145 69,091,078 -3,329,597 -316,689 -893,067 ====================================================================================================================== TITLE V REVOLVING AND MANAGEMENT FUNDS Defense Working Capital Funds............................................ 1,575,010 1,516,184 1,516,184 1,516,184 -58,826 ............... ............... National Defense Sealift Fund............................................ 1,100,519 608,136 564,636 697,840 -402,679 +89,704 +133,204 ---------------------------------------------------------------------------------------------------------------------- Total, title V, Revolving and Management Funds..................... 2,675,529 2,124,320 2,080,820 2,214,024 -461,505 +89,704 +133,204 ====================================================================================================================== TITLE VI OTHER DEPARTMENT OF DEFENSE PROGRAMS Defense Health Program: Operation and maintenance............................................ 30,582,235 31,349,279 31,122,095 30,707,349 +125,114 -641,930 -414,746 Procurement.......................................................... 632,518 506,462 521,762 506,462 -126,056 ............... -15,300 Research, development, test and evaluation........................... 1,267,306 672,977 1,258,377 1,026,977 -240,329 +354,000 -231,400 ---------------------------------------------------------------------------------------------------------------------- Total, Defense Health Program...................................... 32,482,059 32,528,718 32,902,234 32,240,788 -241,271 -287,930 -661,446 Chemical Agents and Munitions Destruction, Defense: Operation and maintenance............................................ 1,147,691 635,843 635,843 635,843 -511,848 ............... ............... Procurement.......................................................... ............... 18,592 18,592 18,592 +18,592 ............... ............... Research, development, test and evaluation........................... 406,731 647,351 647,351 647,351 +240,620 ............... ............... ---------------------------------------------------------------------------------------------------------------------- Total, Chemical Agents............................................. 1,554,422 1,301,786 1,301,786 1,301,786 -252,636 ............... ............... Drug Interdiction and Counter-Drug Activities, Defense................... 1,209,620 999,363 1,133,363 1,138,263 -71,357 +138,900 +4,900 Joint Improvised Explosive Device Defeat Fund............................ ............... 227,414 217,414 ............... ............... -227,414 -217,414 Joint Urgent Operational Needs Fund...................................... ............... 99,477 ............... ............... ............... -99,477 ............... Office of the Inspector General.......................................... 346,919 273,821 350,321 332,921 -13,998 +59,100 -17,400 ---------------------------------------------------------------------------------------------------------------------- Total, title VI, Other Department of Defense Programs.............. 35,593,020 35,430,579 35,905,118 35,013,758 -579,262 -416,821 -891,360 ====================================================================================================================== TITLE VII RELATED AGENCIES Central Intelligence Agency Retirement and Disability System Fund........ 513,700 514,000 514,000 514,000 +300 ............... ............... Intelligence Community Management Account (ICMA)......................... 547,891 540,252 511,476 542,346 -5,545 +2,094 +30,870 ---------------------------------------------------------------------------------------------------------------------- Total, title VII, Related agencies................................. 1,061,591 1,054,252 1,025,476 1,056,346 -5,245 +2,094 +30,870 ====================================================================================================================== TITLE VIII GENERAL PROVISIONS Additional transfer authority (Sec. 8005)................................ (3,750,000) (5,000,000) (3,000,000) (5,000,000) (+1,250,000) ............... (+2,000,000) Indian Financing Act incentives (Sec. 8019).............................. 15,000 ............... 15,000 15,000 ............... +15,000 ............... FFRDC (Sec. 8023)........................................................ -150,245 ............... ............... ............... +150,245 ............... ............... Overseas Military Facility Invest Recovery (Sec. 8028)................... 1,000 ............... ............... ............... -1,000 ............... ............... Rescissions (Sec. 8040).................................................. -2,575,217 ............... -1,019,316 -2,105,755 +469,462 -2,105,755 -1,086,439 O&M, Defense-wide transfer authority (Sec. 8051)......................... (30,000) (30,000) (30,000) (30,000) ............... ............... ............... O&M, Army transfer authority (Sec. 8066)................................. (124,493) (133,381) (133,381) (133,381) (+8,888) ............... ............... Fisher House Foundation.................................................. 4,000 ............... 4,000 ............... -4,000 ............... -4,000 National grants (Sec. 8076).............................................. 44,000 ............... 44,000 20,000 -24,000 +20,000 -24,000 Shipbuilding unspecified transfer (Sec. 8080) (outlays).................. ............... ............... ............... ............... ............... ............... ............... Shipbuilding & conversion funds, Navy (Sec. 8080)........................ 8,000 8,000 8,000 8,000 ............... ............... ............... Global Security Contingency Fund (O&M, Defense-wide (transfer) (Sec. (200,000) (200,000) ............... (200,000) ............... ............... (+200,000) 8068)................................................................... Working Capital Fund excess cash balances................................ -515,000 ............... ............... ............... +515,000 ............... ............... Excess Army Working Capital Fund carryover............................... ............... ............... -2,460,900 ............... ............... ............... +2,460,900 Fisher House transfer authority (Sec. 8093).............................. (11,000) (11,000) (11,000) (11,000) ............... ............... ............... ICMA transfer authority (Sec. 8089)...................................... (20,000) (20,000) ............... (20,000) ............... ............... (+20,000) Defense Health O&M transfer authority (Sec. 8098)........................ (135,631) (139,204) (139,204) (139,204) (+3,573) ............... ............... Stop Loss transfer fund (outlays)........................................ ............... ............... ............... ............... ............... ............... ............... Alternative Energy Resources for Deployed Forces......................... 10,000 ............... ............... ............... -10,000 ............... ............... Operation and Maintenance, Defense-Wide (Sec. 8105)...................... 250,000 ............... 270,000 ............... -250,000 ............... -270,000 (transfer authority)................................................. ............... (51,000) ............... (51,000) (+51,000) ............... (+51,000) MIP Transfer Fund (Sec. 8087)............................................ 310,758 ............... ............... ............... -310,758 ............... ............... Ship Modernization, Operations, Sustainment Fund (Sec. 8103)............. ............... ............... ............... 2,382,100 +2,382,100 +2,382,100 +2,382,100 Eliminate civilian pay raise (Sec. 8119)................................. ............... ............... -258,524 ............... ............... ............... +258,524 Defense spending freeze (exclude Title I, Defense Health Program, and ............... ............... -1,072,581 ............... ............... ............... +1,072,581 Title IX) (House)....................................................... ---------------------------------------------------------------------------------------------------------------------- Total, Title VIII, General Provisions.............................. -2,597,704 8,000 -4,470,321 319,345 +2,917,049 +311,345 +4,789,666 ====================================================================================================================== TITLE IX OVERSEAS CONTINGENCY OPERATIONS (OCO) Military Personnel Military Personnel, Army (OCO)........................................... 7,195,335 9,165,082 9,263,779 9,790,082 +2,594,747 +625,000 +526,303 Military Personnel, Navy (OCO)........................................... 1,259,234 874,625 879,798 869,625 -389,609 -5,000 -10,173 Military Personnel, Marine Corps (OCO)................................... 714,360 1,621,356 1,640,838 1,623,356 +908,996 +2,000 -17,482 Military Personnel, Air Force (OCO)...................................... 1,492,381 1,286,783 1,300,640 1,286,783 -205,598 ............... -13,857 Reserve Personnel, Army (OCO)............................................ 207,162 156,893 158,583 156,893 -50,269 ............... -1,690 Reserve Personnel, Navy (OCO)............................................ 44,530 39,335 39,759 39,335 -5,195 ............... -424 Reserve Personnel, Marine Corps (OCO).................................... 25,421 24,722 24,988 24,722 -699 ............... -266 Reserve Personnel, Air Force (OCO)....................................... 26,815 25,348 25,621 25,348 -1,467 ............... -273 National Guard Personnel, Army (OCO)..................................... 664,579 583,804 590,091 583,804 -80,775 ............... -6,287 National Guard Personnel, Air Force (OCO)................................ 9,435 10,473 10,586 10,473 +1,038 ............... -113 ---------------------------------------------------------------------------------------------------------------------- Total, Military Personnel.......................................... 11,639,252 13,788,421 13,934,683 14,410,421 +2,771,169 +622,000 +475,738 Operation and Maintenance Operation & Maintenance, Army (OCO)...................................... 44,794,156 28,591,441 26,682,437 30,578,256 -14,215,900 +1,986,815 +3,895,819 Operation & Maintenance, Navy (OCO)...................................... 7,674,026 5,880,395 5,880,395 6,968,812 -705,214 +1,088,417 +1,088,417 Coast Guard (by transfer) (OCO)...................................... ............... (254,461) (254,461) ............... ............... (-254,461) (-254,461) Operation & Maintenance, Marine Corps (OCO).............................. 3,935,210 4,066,340 4,566,340 4,108,340 +173,130 +42,000 -458,000 Operation & Maintenance, Air Force (OCO)................................. 10,879,347 9,241,613 9,136,236 9,291,493 -1,587,854 +49,880 +155,257 Operation & Maintenance, Defense-Wide (OCO).............................. 9,252,211 7,824,579 7,790,579 8,274,052 -978,159 +449,473 +483,473 Coalition support funds (OCO)........................................ (1,690,000) (1,750,000) (1,750,000) (1,750,000) (+60,000) ............... ............... Operation & Maintenance, Army Reserve (OCO).............................. 217,500 154,537 157,887 154,537 -62,963 ............... -3,350 Operation & Maintenance, Navy Reserve (OCO).............................. 74,148 55,924 55,924 55,924 -18,224 ............... ............... Operation & Maintenance, Marine Corps Reserve (OCO)...................... 36,084 25,477 25,477 25,477 -10,607 ............... ............... Operation & Maintenance, Air Force Reserve (OCO)......................... 142,050 120,618 120,618 120,618 -21,432 ............... ............... Operation & Maintenance, Army National Guard (OCO)....................... 377,544 382,448 392,448 382,448 +4,904 ............... -10,000 Operation & Maintenance, Air National Guard (OCO)........................ 34,050 19,975 34,500 19,975 -14,075 ............... -14,525 Overseas Contingency Operations Transfer Fund (OCO)...................... ............... ............... 3,231,500 ............... ............... ............... -3,231,500 ---------------------------------------------------------------------------------------------------------------------- Subtotal, Operation and Maintenance................................ 77,416,326 56,363,347 58,074,341 59,979,932 -17,436,394 +3,616,585 +1,905,591 Afghanistan Infrastructure Fund (OCO).................................... 400,000 400,000 200,000 350,000 -50,000 -50,000 +150,000 Afghanistan Security Forces Fund (OCO)................................... 11,200,000 5,749,167 4,592,213 5,149,167 -6,050,833 -600,000 +556,954 ---------------------------------------------------------------------------------------------------------------------- Total, Operation and Maintenance................................... 89,016,326 62,512,514 62,866,554 65,479,099 -23,537,227 +2,966,585 +2,612,545 Procurement Aircraft Procurement, Army (OCO)......................................... 1,137,381 486,200 541,600 1,140,294 +2,913 +654,094 +598,694 Missile Procurement, Army (OCO).......................................... 126,556 49,653 49,653 67,951 -58,605 +18,298 +18,298 Procurement of Weapons and Tracked Combat Vehicles, Army (OCO)........... 37,117 15,422 15,422 15,422 -21,695 ............... ............... Procurement of Ammunition, Army (OCO).................................... 208,381 357,493 338,493 326,193 +117,812 -31,300 -12,300 Other Procurement, Army (OCO)............................................ 1,334,345 2,015,907 2,005,907 2,284,190 +949,845 +268,283 +278,283 Aircraft Procurement, Navy (OCO)......................................... 480,935 164,582 146,277 426,436 -54,499 +261,854 +280,159 Weapons Procurement, Navy (OCO).......................................... 41,070 23,500 22,500 23,500 -17,570 ............... +1,000 Procurement of Ammunition, Navy and Marine Corps (OCO)................... 317,100 285,747 284,450 284,356 -32,744 -1,391 -94 Other Procurement, Navy (OCO)............................................ 236,125 98,882 98,882 98,882 -137,243 ............... ............... Procurement, Marine Corps (OCO).......................................... 1,233,996 943,683 943,683 865,977 -368,019 -77,706 -77,706 Aircraft Procurement, Air Force (OCO).................................... 1,235,777 305,600 305,600 395,327 -840,450 +89,727 +89,727 Missile Procurement, Air Force (OCO)..................................... 41,220 34,350 34,350 34,350 -6,870 ............... ............... Procurement of Ammunition, Air Force (OCO)............................... 109,010 116,203 116,203 116,203 +7,193 ............... ............... Other Procurement, Air Force (OCO)....................................... 3,088,510 2,818,270 2,785,170 2,684,470 -404,040 -133,800 -100,700 Procurement, Defense-Wide (OCO).......................................... 405,768 196,349 217,849 362,749 -43,019 +166,400 +144,900 National Guard and Reserve Equipment (OCO)............................... 1,000,000 ............... ............... 1,000,000 ............... +1,000,000 +1,000,000 Mine Resistant Ambush Protected Vehicle Fund (OCO)....................... 2,600,170 ............... ............... ............... -2,600,170 ............... ............... ---------------------------------------------------------------------------------------------------------------------- Total, Procurement................................................. 13,633,461 7,911,841 7,906,039 10,126,300 -3,507,161 +2,214,459 +2,220,261 Research, Development, Test and Evaluation Research, Development, Test & Evaluation, Army (OCO)..................... 18,513 19,860 14,860 42,357 +23,844 +22,497 +27,497 Research, Development, Test & Evaluation, Navy (OCO)..................... 53,884 60,119 60,119 52,519 -1,365 -7,600 -7,600 Research, Development, Test & Evaluation, Air Force (OCO)................ 259,600 53,150 53,150 53,150 -206,450 ............... ............... Research, Development, Test and Evaluation, Defense-Wide (OCO)........... 194,361 112,387 107,387 112,387 -81,974 ............... +5,000 ---------------------------------------------------------------------------------------------------------------------- Total, Research, Development, Test and Evaluation.................. 526,358 245,516 235,516 260,413 -265,945 +14,897 +24,897 Revolving and Management Funds Defense Working Capital Funds (OCO)...................................... 435,013 503,364 293,600 1,467,864 +1,032,851 +964,500 +1,174,264 ---------------------------------------------------------------------------------------------------------------------- Total, Revolving and Management Funds.............................. 435,013 503,364 293,600 1,467,864 +1,032,851 +964,500 +1,174,264 ====================================================================================================================== Other Department of Defense Programs Defense Health Program: Operation and maintenance (OCO)...................................... 1,228,288 993,898 1,003,898 993,898 -234,390 ............... -10,000 Procurement (OCO).................................................... ............... ............... ............... ............... ............... ............... ............... Research, development, test & evaluation (OCO)....................... ............... ............... ............... ............... ............... ............... ............... ---------------------------------------------------------------------------------------------------------------------- Total, Defense Health Program...................................... 1,228,288 993,898 1,003,898 993,898 -234,390 ............... -10,000 Drug Interdiction and Counter-Drug Activities, Defense (OCO)............. 456,458 469,025 469,025 469,025 +12,567 ............... ............... Joint IED Defeat Fund (OCO).............................................. 2,441,984 1,675,400 1,614,900 1,514,114 -927,870 -161,286 -100,786 Joint Urgent Operational Needs Fund (OCO)................................ ............... 100,000 ............... ............... ............... -100,000 ............... Office of the Inspector General (OCO).................................... 11,055 10,766 10,766 10,766 -289 ............... ............... ---------------------------------------------------------------------------------------------------------------------- Total, Other Department of Defense Programs........................ 4,137,785 3,249,089 3,098,589 2,987,803 -1,149,982 -261,286 -110,786 ====================================================================================================================== TITLE IX General Provisions Additional transfer authority (OCO) (Sec. 9002).......................... (4,000,000) (4,000,000) (3,000,000) (4,000,000) ............... ............... (+1,000,000) Troop reduction (OCO).................................................... -4,042,500 ............... ............... ............... +4,042,500 ............... ............... Rescissions (OCO) (Sec. 9013)............................................ -380,060 ............... -579,900 -1,705,900 -1,325,840 -1,705,900 -1,126,000 Operation and Maintenance, Defense-Wide (House) (OCO).................... ............... ............... -650,000 ............... ............... ............... +650,000 ---------------------------------------------------------------------------------------------------------------------- Total, General Provisions.......................................... -4,422,560 ............... -1,229,900 -1,705,900 +2,716,660 -1,705,900 -476,000 ---------------------------------------------------------------------------------------------------------------------- Total, Title IX.................................................... 114,965,635 88,210,745 87,105,081 93,026,000 -21,939,635 +4,815,255 +5,920,919 ====================================================================================================================== Total for the bill (net)........................................... 622,862,127 601,225,998 597,708,873 596,644,000 -26,218,127 -4,581,998 -1,064,873 Less appropriations for subsequent years....................... ............... -4,426,700 ............... ............... ............... +4,426,700 ............... Plus appropriations provided in prior years.................... ............... ............... ............... ............... ............... ............... ............... ---------------------------------------------------------------------------------------------------------------------- Net grand total.................................................... 622,862,127 596,799,298 597,708,873 596,644,000 -26,218,127 -155,298 -1,064,873 ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------