[Senate Report 112-196]
[From the U.S. Government Publishing Office]


                                                       Calendar No. 485
112th Congress                                                   Report
                                 SENATE
 2d Session                                                     112-196

======================================================================



 
            DEPARTMENT OF DEFENSE APPROPRIATIONS BILL, 2013

                                _______
                                

                 August 2, 2012.--Ordered to be printed

                                _______
                                

           Mr. Inouye, from the Committee on Appropriations, 
                        submitted the following

                                 REPORT

                        [To accompany H.R. 5856]

    The Committee on Appropriations, to which was referred the 
bill (H.R. 5856) making appropriations for the Department of 
Defense for the fiscal year ending September 30, 2013, and for 
other purposes, reports the same to the Senate with an 
amendment, and recommends that the bill as amended do pass.



New obligational authority

Total of bill as reported to the Senate.................$596,644,000,000
Amount of 2012 appropriations........................... 622,862,127,000
Amount of 2013 budget estimate.......................... 596,799,298,000
Amount of House allowance............................... 597,708,873,000
Bill as recommended to Senate compared to--
    2012 appropriations................................. -26,218,127,000
    2013 budget estimate................................    -155,298,000
    Amount of House allowance...........................  -1,064,873,000


                                CONTENTS

                              ----------                              
Background:
                                                                   Page
    Purpose of the Bill..........................................     5
    Hearings.....................................................     5
    Summary of the Bill..........................................     5
    Definition of Program, Project and Activity..................     8
    Committee Initiatives........................................     9
Title I:
    Military Personnel:
        Military Personnel Overview..............................    17
        Military Personnel, Army.................................    18
        Military Personnel, Navy.................................    22
        Military Personnel, Marine Corps.........................    25
        Military Personnel, Air Force............................    28
        Reserve Personnel, Army..................................    31
        Reserve Personnel, Navy..................................    33
        Reserve Personnel, Marine Corps..........................    35
        Reserve Personnel, Air Force.............................    37
        National Guard Personnel, Army...........................    39
        National Guard Personnel, Air Force......................    41
Title II:
    Operation and Maintenance:
        Operation and Maintenance, Army..........................    45
        Operation and Maintenance, Navy..........................    50
        Operation and Maintenance, Marine Corps..................    55
        Operation and Maintenance, Air Force.....................    58
        Operation and Maintenance, Defense-Wide..................    62
        Operation and Maintenance, Army Reserve..................    67
        Operation and Maintenance, Navy Reserve..................    69
        Operation and Maintenance, Marine Corps Reserve..........    72
        Operation and Maintenance, Air Force Reserve.............    74
        Operation and Maintenance, Army National Guard...........    76
        Operation and Maintenance, Air National Guard............    79
        U.S. Court of Appeals for the Armed Forces...............    81
        Environmental Restoration, Army..........................    81
        Environmental Restoration, Navy..........................    81
        Environmental Restoration, Air Force.....................    81
        Environmental Restoration, Defense-Wide..................    81
        Environmental Restoration, Formerly Used Defense Sites...    82
        Overseas Humanitarian, Disaster, and Civic Aid...........    82
        Cooperative Threat Reduction Account.....................    82
        Department of Defense Acquisition Workforce Development 
          Fund...................................................    82
Title III:
    Procurement:
        Aircraft Procurement, Army...............................    87
        Missile Procurement, Army................................    91
        Procurement of Weapons and Tracked Combat Vehicles, Army.    94
        Procurement of Ammunition, Army..........................    97
        Other Procurement, Army..................................   100
        Aircraft Procurement, Navy...............................   112
        Weapons Procurement, Navy................................   117
        Procurement of Ammunition, Navy and Marine Corps.........   120
        Shipbuilding and Conversion, Navy........................   123
        Other Procurement, Navy..................................   127
        Procurement, Marine Corps................................   136
        Aircraft Procurement, Air Force..........................   140
        Missile Procurement, Air Force...........................   146
        Procurement of Ammunition, Air Force.....................   150
        Other Procurement, Air Force.............................   152
        Procurement, Defense-Wide................................   156
        Defense Production Act Purchases.........................   162
Title IV:
    Research, Development, Test and Evaluation:
        Research, Development, Test and Evaluation, Army.........   167
        Research, Development, Test and Evaluation, Navy.........   180
        Research, Development, Test and Evaluation, Air Force....   192
        Research, Development, Test and Evaluation, Defense-Wide.   209
        Operational Test and Evaluation, Defense.................   220
Title V:
    Revolving and Management Funds:
        Defense Working Capital Funds............................   223
        National Defense Sealift Fund............................   223
Title VI:
    Other Department of Defense Programs:
        Defense Health Program...................................   225
        Chemical Agents and Munitions Destruction, Defense.......   232
        Drug Interdiction and Counter-Drug Activities, Defense...   234
        Joint Improvised Explosive Device Defeat Fund............   234
        Joint Urgent Operational Needs Fund......................   234
        Office of the Inspector General..........................   234
Title VII:
    Related Agencies:
        Central Intelligence Agency Retirement and Disability 
          System 
          Fund...................................................   235
        Intelligence Community Management Account................   235
Title VIII: General Provisions...................................   236
Title IX: Overseas Deployments and Other Programs:
    Department of Defense--Military..............................   243
    Military Personnel:
        Military Personnel, Army.................................   244
        Military Personnel, Navy.................................   245
        Military Personnel, Marine Corps.........................   246
        Military Personnel, Air Force............................   247
        Reserve Personnel, Army..................................   248
        Reserve Personnel, Navy..................................   249
        Reserve Personnel, Marine Corps..........................   249
        Reserve Personnel, Air Force.............................   250
        National Guard Personnel, Army...........................   250
        National Guard Personnel, Air Force......................   251
    Operation and Maintenance:
        Operation and Maintenance, Army..........................   251
        Operation and Maintenance, Navy..........................   253
        Operation and Maintenance, Marine Corps..................   254
        Operation and Maintenance, Air Force.....................   255
        Operation and Maintenance, Defense-Wide..................   256
        Operation and Maintenance, Army Reserve..................   257
        Operation and Maintenance, Navy Reserve..................   257
        Operation and Maintenance, Marine Corps Reserve..........   258
        Operation and Maintenance, Air Force Reserve.............   258
        Operation and Maintenance, Army National Guard...........   258
        Operation and Maintenance, Air National Guard............   259
        Afghanistan Infrastucture Fund...........................   259
        Afghanistan Security Forces Fund.........................   260
    Procurement:
        Aircraft Procurement, Army...............................   261
        Missile Procurement, Army................................   262
        Procurement of Weapons and Tracked Combat Vehicles, Army.   262
        Procurement of Ammunition, Army..........................   263
        Other Procurement, Army..................................   263
        Aircraft Procurement, Navy...............................   264
        Weapons Procurement, Navy................................   264
        Procurement of Ammunition, Navy and Marine Corps.........   266
        Other Procurement, Navy..................................   266
        Procurement, Marine Corps................................   267
        Aircraft Procurement, Air Force..........................   268
        Missile Procurement, Air Force...........................   268
        Procurement of Ammunition, Air Force.....................   268
        Other Procurement, Air Force.............................   269
        Procurement, Defense-Wide................................   269
        National Guard and Reserve Equipment.....................   270
    Research, Development, Test and Evaluation:
        Research, Development, Test and Evaluation, Army.........   272
        Research, Development, Test and Evaluation, Navy.........   272
        Research, Development, Test and Evaluation, Air Force....   273
        Research, Development, Test and Evaluation, Defense-Wide.   273
    Revolving and Management Funds: Defense Working Capital Funds   273
    Other Department of Defense Programs:
        Defense Health Program...................................   274
        Drug Interdiction and Counter-Drug Activities, Defense...   274
        Joint Improvised Explosive Device Defeat Fund............   275
        Joint Urgent Operational Needs Fund......................   276
        Office of the Inspector General..........................   276
        General Provisions--This Title...........................   277
Compliance With Paragraph 7, Rule XVI of the Standing Rules of 
  the 
  Senate.........................................................   279
Compliance With Paragraph 7(c), Rule XXVI of the Standing Rules 
  of the Senate..................................................   280
Compliance With Paragraph 12, Rule XXVI of the Standing Rules of 
  the Senate.....................................................   281
Budgetary Impact of Bill.........................................   282
Comparative Statement of Budget Authority........................   283

                               BACKGROUND

                          Purpose of the Bill

    This bill makes appropriations for the military functions 
of the Department of Defense for the period October 1, 2012, 
through September 30, 2013. Functional areas include the pay, 
allowances, and support of military personnel, operation and 
maintenance of the forces, procurement of equipment and 
systems, and research, development, test and evaluation. 
Appropriations for foreign military assistance, military 
construction, family housing, nuclear weapons programs, and 
civil defense are provided in other bills.

                                Hearings

    The Appropriations Subcommittee on Defense began hearings 
on March 7, 2012, and concluded them on June 13, 2012, after 
nine separate sessions. The subcommittee heard testimony from 
representatives of the Department of Defense, other Federal 
agencies, representatives of organizations, and the public. In 
addition to these hearings, the subcommittee held four 
classified briefings with the regional Combatant Commanders and 
Commander of U.S. Special Operations Command.

                          Summary of the Bill

    The Committee recommendation of $596,644,000,000 includes 
funding to develop, maintain, and equip the military forces of 
the United States in nonemergency appropriations.
    The fiscal year 2013 budget request for activities funded 
in the Department of Defense appropriations bill totals 
$596,799,298,000 in new budget authority, including 
$88,210,745,000 in contingency funding and $514,000,000 in 
mandatory spending.
    In fiscal year 2012, the Congress appropriated 
$622,862,127,000 for activities funded in this bill. This 
amount includes $507,896,492,000 in nonemergency appropriations 
and $114,965,635,000 in overseas contingency operations 
appropriations.
    The Committee recommendation in this bill is 
$26,218,127,000 below the amount provided in fiscal year 2012 
and $155,298,000 below the amount requested for fiscal year 
2013. The Committee recommends that $254,461,000 requested for 
Coast Guard activities be appropriated directly to the 
Department of Homeland Security.

                       COMMITTEE RECOMMENDATIONS

    The following table displays the recommendations for each 
title:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                            Fiscal year 2012  Fiscal year 2013      Committee
                                                                 enacted          estimate       recommendation
----------------------------------------------------------------------------------------------------------------
Title I--Military personnel...............................       131,090,539       128,430,025       127,502,463
Title II--Operation and maintenance.......................       163,073,141       174,938,933       170,785,490
Title III--Procurement....................................       104,579,701        97,194,677        97,635,496
Title IV--Research, development, test and evaluation......        72,420,675        69,407,767        69,091,078
Title V--Revolving and management funds...................         2,675,529         2,124,320         2,214,024
Title VI--Other Department of Defense programs............        35,593,020        35,430,579        35,013,758
Title VII--Related agencies...............................         1,061,591         1,054,252         1,056,346
Title VIII--General provisions (net)......................        -2,597,704             8,000           319,345
Title IX--Overseas Contingency Operations.................       114,965,635        88,210,745        93,026,000
                                                           -----------------------------------------------------
      Net grand total.....................................       622,862,127       596,799,298       596,644,000
                                                           =====================================================
      Total discretionary\1\..............................       633,229,427       604,613,298       604,458,000
----------------------------------------------------------------------------------------------------------------
\1\Includes scorekeeping adjustments for nonemergency and overseas contingency operations appropriations.

                        DEFENSE BUDGET OVERVIEW

    Due to budget reductions mandated by the Budget Control 
Act, the Department of Defense was required to reduce its 
planned spending over the next decade. The Committee fully 
supports efforts to bring down the Nation's deficit but is 
concerned about the Department's approach to meet the targets 
set in the Budget Control Act. The Committee believes that 
instead of correcting years of poor fiscal discipline, the 
Department chose to make substantial reductions in force 
structure and take risk in meeting U.S. military commitments 
around the globe. Over the past several years, Congress has 
sustained the current force structure while finding tens of 
billions of dollars in annual savings by scrutinizing the 
budget request and removing funds from troubled programs, 
duplicative requests, and overstatement of certain funding 
requirements.
    The Committee believes that when the Department decided to 
combine the program and budget review during the Planning, 
Programming and Budgeting Execution [PPBE] process, the Under 
Secretary of Defense, Comptroller and the Comptroller staff's 
ability to exercise oversight of the budget was lost. This lack 
of oversight within the Department must be corrected.
    Not only is fiscal discipline lacking in the budget 
request, the Committee is concerned about the above threshold 
reprogrammings that the Department submits to Congress. The 
Committee understands fact of life changes will occur after the 
budget is approved by Congress and provides significant 
flexibility in general and special transfer authority to 
account for these unanticipated changes. However, the number of 
reprogrammings, dollar amounts, and significant increase of 
requests to start new programs outside the normal budget cycle 
that do not receive the same level of oversight, scrutiny and 
documentation, is disconcerting.
    The Committee strongly urges the Secretary of Defense to 
address these issues when building future budget requests to 
ensure the Department is utilizing funds efficiently and not 
requesting funds that cannot be spent in the year of execution, 
instead of proposing reductions to needed force structure.
    In the fiscal year 2013 defense budget, the Committee takes 
the same approach as prior years and makes funding adjustments 
to correct for lax budgeting. This funding is redirected to: 
(1) restore significant portions of force structure; (2) fund 
items that were identified as shortfalls or as combat losses by 
the Department after the budget was submitted; (3) fund 
increases authorized in S. 3254, National Defense Authorization 
Act for Fiscal Year 2013, as reported; and (4) fund various 
Committee initiatives that are addressed in further detail 
later in the report.
    Force Structure.--For the Department of the Army, the 
Committee recommends more than $700,000,000 for Army aviation 
to replace combat losses, procure additional helicopters that 
were reduced in the request, and upgrade existing helicopters. 
The Committee includes more than $200,000,000 for Abrams Tanks 
and the Improved Recovery Vehicle and nearly $200,000,000 to 
address field requirements for additional Patriot missiles.
    For the Department of the Navy, the Committee does not 
concur with the recommendation to prematurely retire nine Navy 
ships and provides over $2,300,000,000 to man, operate, equip, 
and modernize these ships. In addition, the Committee provides 
over $770,000,000 for advance procurement of a tenth Virginia-
class submarine, $1,000,000,000 for an additional DDG-51 
destroyer, and $263,255,000 for advance procurement of an 
amphibious warship. These funds were not included in the budget 
request, but the Committee believes these ships are crucial to 
supporting our Navy's global requirements, particularly as the 
U.S. military shifts its focus to the Pacific. These and other 
Navy shipbuilding adjustments are discussed in more detail 
later in the report. The Committee also provides $60,000,000 
for advance procurement for 15 additional EA-18Gs to reverse 
the Navy's decision to end production of these aircraft.
    For the Department of the Air Force, in recognition of 
Title XVII of S. 3254, National Defense Authorization Act for 
Fiscal Year 2013, as reported, which pauses Air Force force 
structure movements for 1 year until a National Commission 
conducts a study of the current structure and makes 
recommendations to Congress on modifications to this force, the 
Committee provides over $800,000,000 to fund the 1-year 
moratorium. The Committee directs that none of the funds made 
available by this act will be used to make proposed force 
structure adjustments, unless the Committee has approved the 
Air Force proposal elsewhere in this act, until after the 
National Commission's recommendations are provided to the 
congressional defense committees.
    In addition, the Committee reverses the Air Force's request 
to terminate the Space Test Program and Operationally 
Responsive Space Program and includes $135,000,000 to continue 
these initiatives. Finally, the Committee includes a provision 
requiring the Department to complete the execution of funds 
previously authorized and appropriated for Global Hawk Block 30 
and C-27J aircraft instead of sending these new, highly capable 
aircraft into storage as the Air Force proposed.
    For the Missile Defense Agency, the Committee recommends 
additional funds for programs that were reduced in the fiscal 
year 2013 budget request, including $163,000,000 for an 
additional AN-TPY 2 radar and $189,000,000 for additional SM-3 
Block 1B interceptors.
    Shortfalls Identified After the Budget Submission.--The 
Committee provides substantial funds throughout the act to 
cover shortfalls identified by Department of Defense officials 
subsequent to the budget submission. Some examples include: 
$964,500,000 to mitigate projected fiscal year 2013 shortfalls 
for fuel and second destination transportation costs; 
$392,000,000 for the military personnel accounts; $293,000,000 
for Operation and Maintenance, Navy for increased aircraft 
carrier, intelligence, surveillance and reconnaissance assets, 
and mine countermeasure ships presence in the U.S. Central 
Command Area of Responsibility; $150,000,000 to repair damage 
on the USS Miami; $211,000,000 for Israel's Iron Dome program; 
and $142,200,000 for High Definition Full Motion Video 
capability for U.S. Special Operations Command. In addition, 
the Committee provides $1,000,000,000 for National Guard and 
Reserve Equipment to help alleviate a $37,000,000,000 equipment 
shortfall identified by the Reserve Component.
    Increases Authorized in S. 3254, as Reported.--Aside from 
supporting the force structure adjustments included in S. 3254, 
National Defense Authorization Act for Fiscal Year 2013, as 
reported, the Committee also provides $273,000,000 to restore 
proposed TRICARE fee increases denied in S. 3254; $200,000,000 
for the Rapid Innovation Program; $50,000,000 for additional 
intelligence, surveillance, and reconnaissance for Operation 
Observant Compass; $30,000,000 for the Industrial Base 
Innovation Fund; $59,100,000 for the Office of the Inspector 
General; additional amounts for a classified program; and funds 
for several other authorized increases.
    With all these adjustments, the Committee paid special 
attention to avoid levying bills on the Department of Defense 
in future years. In many instances, the Committee provides 
sufficient funds to pay down future requirements for 
modernizing and buying new platforms and equipment, replacing 
losses sustained in combat, or providing funds for shortfalls 
that the Department would have to reprogram during fiscal year 
2013. The Committee believes that the adjustments made to the 
budget request will help improve financial management while 
ensuring that our men and women in uniform and their families 
are provided the best support and equipment the Nation can 
offer during these challenging economic times.

                     CLASSIFIED PROGRAM ADJUSTMENTS

    The Committee recommends adjustments to certain classified 
programs, as explained in the classified annex to the 
Committee's report.

              Definition of Program, Project and Activity

    In fiscal year 2013, for purposes of the Balanced Budget 
and Emergency Deficit Control Act of 1985 (Public Law 99-177), 
as amended, the term ``program, project and activity'' for 
appropriations contained in this act shall be defined as the 
most specific level of budget items identified in the 
Department of Defense Appropriations Act, 2013 and the P-1 and 
R-1 budget justification documents as subsequently modified by 
congressional action. The following exception to the above 
definition shall apply: for the military personnel and 
operation and maintenance accounts the term ``program, project 
and activity'' is defined as the appropriations accounts 
contained in the Department of Defense Appropriations Act.
    In carrying out any Presidential sequestration, the 
Department of Defense and agencies shall conform to the 
definition for ``program, project and activity'' set forth 
above.

                         Committee Initiatives

    The Committee has included funding above the President's 
budget request for several programmatic initiatives which the 
Committee believes are of inherent value for national defense. 
In several cases, funds are restored for programs which were 
included in previous Department of Defense budget requests, and 
several are for programs that the Committee believes are 
necessary to improve defense even though they have not been 
included under the request formulated by the Department of 
Defense. For instance, the Committee provides additional 
research funding in the following areas: alternative energy, 
space situational awareness, unexploded ordnance and landmine 
detection, nanotechnology, advanced metals and materials, 
military burn treatment, and traumatic brain injury and 
psychological health. The Committee believes additional 
research funding is warranted in these and other areas to 
ensure that the Department of Defense continues to pursue 
technological advances that are critical to our national 
defense. The Committee has also provided funding for programs 
that are chronically underfunded, such as test and training 
range upgrades and range conservation. The Committee directs 
that funding for these initiatives are to be competitively 
awarded or provided to programs that have received competitive 
awards in the past.
    Ship Modernization, Operations and Sustainment Fund.--The 
Department of Defense's 2012 defense strategy (``Sustaining 
U.S. Global Leadership: Priorities for 21st Century Defense'') 
calls for a ``rebalance toward the Asia-Pacific region''; 
however, the Navy's fiscal year 2013 budget submission includes 
a proposal to prematurely retire seven cruisers and two dock 
landing ships in the next 2 years. The Committee is concerned 
with this proposed elimination of force structure and believes 
it is disconnected from the defense strategy, creates future 
unaffordable shipbuilding requirements, and exacerbates force 
structure shortfalls that negatively impact the Department's 
ability to meet Combatant Commander requirements.
    The Committee is troubled by the impact that the proposed 
premature retirement of these ships will have on the 
Department's strategic realignment toward the Asia-Pacific 
region. Specifically, the Committee is concerned about the 
operational impact of this reduction in force structure on the 
balance of the Fleet as it attempts to meet requirements in the 
Asia-Pacific, as well as demands in the Middle East and other 
parts of the world. In addition, the Committee notes that with 
one exception, the cruisers proposed for premature retirement 
were slated to receive ballistic missile defense capability 
that has already proven of significant operational relevance 
and that the elimination of this capability creates further 
strain on the Department's ability to meet Combatant Commander 
requirements.
    In addition, the Committee believes that prematurely 
retiring capable and relevant ships following an initial 
investment of no less than $11,600,000,000 in current fiscal 
year 2012 dollars creates unnecessary and unaffordable future 
shipbuilding requirements. The Committee notes that current 
fiscal pressures on the Navy's shipbuilding budget are not 
likely to be alleviated prior to the end of the next decade, 
when a large number of surface ships are scheduled for 
retirement, and significant capital investments will be 
required to procure the Ohio class replacement submarine and 
the next Ford class aircraft carrier. By the Navy's own 
estimates, implementation of the fiscal year 2013 30-year 
shipbuilding plan requires a significant and sustained increase 
in the Navy's shipbuilding budget over the next 2 decades. 
Absent this funding increase, platforms scheduled to be 
procured will be deferred, and the desired force structure will 
not be achieved. The Committee notes that over the past 8 
years, on average, the Navy's actual ship procurements have 
been roughly three platforms less than envisioned in the 
respective shipbuilding plans. Therefore, the Committee 
questions the wisdom of eliminating force structure with 
premature ship retirements.
    Finally, the Committee notes that a ship's expected service 
life is a significant factor for justifying its extensive up-
front investments. Curtailing ship service lives, as the Navy 
is again proposing, calls into question the Department of the 
Navy assumptions and specifications when funding new ship 
acquisitions. The Committee notes that the nine platforms 
proposed for premature retirement have a combined remaining 
service life in excess of 120 years, roughly one-third of their 
service life, and that the Navy shipbuilding plan does not 
include a sufficient quantity of ships to offset the loss of 
these platforms. In fact, annual ship procurement will decline 
from an average of 10 or more battle ships per year in the two 
previous 5-year shipbuilding plans to approximately 8 battle 
ships per year in the current 5-year plan.
    The Committee has been informed that the Navy still 
believes in the operational relevance and capability of these 
platforms, and that the decision to request their premature 
retirement in the fiscal year 2013 budget request was strictly 
driven by fiscal constraints. Therefore, the Committee 
recommends denying these proposed premature retirements and 
retaining this force structure in its entirety. The Committee 
recommends full funding, as identified by the Navy, to man, 
operate, sustain, upgrade, equip, and modernize only CG-63, CG-
64, CG-65, CG-66, CG-68, CG-69, CG-73, LSD-41, and LSD-46 in 
the Ship Modernization, Operations and Sustainment Fund, as 
specified elsewhere in this act. The Committee recommends full 
funding for all known requirements only for these platforms for 
the next 2 fiscal years, and provides the Secretary of the Navy 
the authority to transfer funds from the Ship Modernization, 
Operations and Sustainment Fund to the appropriate 
appropriation accounts in the year of execution following 30-
day prior notification to the congressional defense committees. 
The Committee directs funds to be transferred in accordance 
with the requirements identified to the Committee by the Navy 
and further directs that any deviation from those requirements 
shall be fully and clearly identified to the congressional 
defense committees prior to the initiation of any such 
transfer. The Committee believes that this approach provides 
the fiscal relief required by the Navy to maintain this force 
structure and allows the Navy sufficient time to plan and 
budget for this force structure in future budget submissions.
    Israeli Cooperative Programs.--The fiscal year 2013 budget 
request includes $99,836,000 in Research, Development, Test and 
Evaluation, Defense-Wide for Israeli Cooperative Programs, a 
reduction of $135,864,000 from amounts appropriated in fiscal 
year 2012. The Committee has been informed that additional 
funds are required in fiscal year 2013 to accelerate the 
development and fielding schedules of Israeli Cooperative 
Programs in light of evolving threats. Therefore, the Committee 
recommends an additional $168,900,000 for Israeli Cooperative 
Programs in Research, Development, Test and Evaluation, 
Defense-Wide, as specifically detailed elsewhere in this act, 
to include $39,200,000 which shall be used only for Low Rate 
Initial Production activities as included in the David Sling 
Weapon System Project Agreement between the two governments.
    Further, the Committee has been informed by the Department 
that Israel has additional requirements for the Iron Dome 
short-range rocket and mortar defense system that will be 
executed over 4 years with a total cost of $680,000,000. The 
Department submitted a reprogramming for $70,000,000 to fund 
the fiscal year 2012 requirement. The Committee has been 
informed that another $211,000,000 can be executed in fiscal 
year 2013, which the Committee recommends fully funding in 
Procurement, Defense-Wide, as authorized in S. 3254, the 
National Defense Authorization Act for Fiscal Year 2013, as 
reported. The Committee understands that the Secretary of 
Defense is committed to requesting the remainder of the 
required amount in fiscal years 2014 and 2015 based on an 
annual assessment of Israeli security requirements against an 
evolving threat.
    Directed Requirements.--The Army's fiscal year 2013 budget 
request includes no less than a dozen programs justified as 
supporting ``Directed Requirements'', which are written and 
approved by the Army as an alternative approach to the formal 
acquisition requirements process. The Committee notes that 
``Directed Requirements'' are not an element of the Department 
of Defense Acquisition System, nor are they included in rapid 
acquisition authorities and processes established to address 
urgent warfighter needs. Given the Army's history of 
acquisition failures over the past decade, as documented in the 
January 2011 Decker-Wagner Army Acquisition Review, the 
Committee is concerned that the Army is seeking ad-hoc, near-
term fixes to its endemic acquisition problems rather than 
focusing on acquisition process improvements. The Committee 
does not believe that establishing another deviation from the 
regular acquisition process is warranted and recommends several 
adjustments to programs that are justified as ``Directed 
Requirements''.
    Network Integration Evaluation [NIE] Transitions.--The 
fiscal year 2013 budget request includes $214,270,000 in 
Research, Development, Test and Evaluation, Army to conduct 
semiannual Network Integration Evaluations. The Committee notes 
that the Army plans to conduct its fourth and fifth NIEs during 
fiscal year 2013 and that valuable lessons have been learned 
from previous NIEs. However, concerns about the planning and 
execution process remain, to include the governance process for 
assessing and selecting technologies to test at the NIE, the 
overlap of planning cycles as a result of conducting two NIEs 
in a single calendar year, and the manpower and fiscal 
resources dedicated to these events. To date, the most 
significant outcomes of the NIEs are the termination or 
restructures of programs based on performance issues that would 
likely have been discovered during those programs' regular test 
phase, to include the Nett Warrior in its original 
configuration and the Joint Tactical Radio System Ground Mobile 
Radio. The Committee is concerned, however, that few 
technologies have transitioned from the NIE.
    The Committee remains supportive of the Army's NIE and 
recommends full funding of the fiscal year 2013 budget request; 
however, the Committee may reconsider its position in future 
budget years based on the Army's ability to reduce costs and to 
transition technologies into the acquisition process through 
appropriate processes where warranted. To facilitate near-team 
requirements, the Committee recommends transferring $25,000,000 
from Research, Development, Test and Evaluation, Army to Other 
Procurement, Army, as requested by the Army, specifically for 
nondevelopmental emerging technologies proven at the NIE. In 
addition, the Committee recommends $28,200,000 in Research, 
Development, Test and Evaluation, Army for the transition of 
promising technologies, particularly those developed by 
nontraditional vendors. The Committee directs that none of the 
funds from these two funding sources may be obligated or 
expended until 30 days after written notification to the 
congressional defense committees by the Assistant Secretary of 
the Army for Acquisition, Technology, and Logistics regarding 
the Army's intended use of those funds.
    Patriot Modernization.--The fiscal year 2013 budget request 
includes $109,978,000 in Research, Development, Test and 
Evaluation, Army and $199,565,000 in Missile Procurement, Army 
for Patriot modernization, a combined increase of $199,818,000 
over amounts appropriated in fiscal year 2012. The Committee 
notes that the Patriot modernization acquisition strategy dates 
back to 2002 and assumes an Army air and missile defense 
portfolio significantly different than the one fielded today. 
In recent years, the Army has terminated multiple air and 
missile defense programs, to include the Surfaced-Launched 
Advanced Medium Range Air-to-Air Missile [SLAMRAAM], Joint Land 
Attack Cruise Missile Defense Elevated Netted Sensor [JLENS] 
and Medium Extended Air Defense System [MEADS]. In addition, 
the Army has added several programs in direct support of the 
war effort, including various Counter-Rocket, Artillery, and 
Mortar programs and surveillance aerostats.
    The Committee notes the lack of an approved Patriot 
modernization strategy and further notes that the Army is 
currently drafting a Capability Development Document [CDD] 
which will likely take no less than 1 year to complete. The 
Committee further notes that there is currently neither an Army 
Cost Position, nor an Independent Cost Estimate for Patriot 
modernization, which will likely be an Acquisition Category I 
program. Regardless, the Army has programmed in excess of 
$1,000,000,000 for various Patriot modernization initiatives 
over the next 5 years, most of which would be awarded under 
sole-source contracts. In addition, the Army has unfunded 
Patriot modernization requirements, to include the integration 
of certain capabilities from the MEADS development program, 
which the Department of Defense has identified as potential 
candidates for transition to the Army's air and missile defense 
architecture. The Committee is concerned that the program lacks 
clearly identified requirements, a competitive acquisition 
strategy and a full understanding of costs. These are factors 
that frequently lead to acquisition failures. Therefore, the 
Committee believes it premature to initiate evolutionary 
development projects and denies the requested funding increase 
in Research, Development, Test and Evaluation, Army. The 
Committee recommends funding developmental Patriot 
modernization efforts at the same level as in the prior fiscal 
year. Further, given the warfighter demand for Patriot 
capabilities, the Committee recommends an increase in Missile 
Procurement, Army of $82,640,000 over amounts appropriated in 
fiscal year 2012 for Patriot modernization, and recommends an 
additional $194,232,000 in Missile Procurement, Army, for the 
procurement of 50 Patriot PAC-3 missiles in fiscal year 2013 in 
response to urgent warfighter requirements.
    B-52 Combat Network Communications Technology [CONECT].--
The fiscal year 2013 budget request includes no funds in 
Aircraft Procurement, Air Force for the B-52 CONECT program of 
record due to the Air Force's decision to terminate the 
program, and $34,700,000 in Research, Development, Test and 
Evaluation, Air Force for a restructured, descoped B-52 CONECT 
program. The Committee understands that the Air Force is 
reviewing its decision to terminate the program of record in 
light of potential requirements of the Global Strike Command. 
The Committee further understands that should the Air Force 
reverse its decision to terminate B-52 CONECT during the fiscal 
year 2014 budget process, prior year funds would be available 
to reinstate the program following approval by the 
congressional defense committees. The Committee directs that no 
funds for B-52 CONECT program of record post-milestone C 
activities or a B-52 CONECT restructured program may be 
obligated or expended until 30 days after the congressional 
defense committees have been briefed on the Air Force's 
proposed way ahead, to include certification of full funding of 
the proposed program.
    Military Intelligence Programs [MIP] Budget Exhibits.--The 
Department submits separate classified budget exhibits for the 
MIP in a format that differs from and is substandard to the 
format for unclassified programs. In many cases, these 
classified exhibits present additional detail and supplementary 
information to the justification provided in the unclassified 
Procurement or Research, Development, Test and Evaluation 
[RDT&E] budget exhibits. However, the Committee is concerned 
about the classified weapon system acquisition programs that 
are not justified in the unclassified Procurement or RDT&E 
budget exhibits and are only contained in the classified budget 
exhibits. The Financial Management Regulation delineates the 
exhibits that are required for weapon system acquisition 
programs and does not exclude MIP from this requirement. The 
Under Secretary of Defense, Comptroller is directed to ensure 
all MIP are properly justified to the congressional defense 
committees in accordance with the Financial Management 
Regulation.
    1002 Accounting Reports.--The Committee believes that 
providing the most up-to-date 1002 accounting information to 
the congressional defense committees benefits the Department of 
Defense. Unfortunately, submission of these reports to the 
congressional defense committees has been inconsistent and, in 
some cases, inexplicably late. The Committee is aware that the 
1002 accounting reports are finalized by the Defense Finance 
and Accounting Service and received by the services on the 10th 
calendar day of each month. Therefore, the Committee directs 
the Assistant Secretaries for Financial Management and 
Comptroller of each of the Services as well as the Under 
Secretary of Defense (Comptroller) to submit a 1002 accounting 
report for each appropriation by the 15th working day of the 
month for the previous months' data.
    Solar Energy Development.--The Committee directs the 
Secretary of Defense and the Secretary of the Interior to 
jointly prepare a plan to facilitate solar energy development 
on military installations. The plan should be consistent with 
the military mission and habitat conservation needs of 
disturbed lands on military bases that have been withdrawn from 
the public domain. The Committee directs the Secretaries to 
submit to the congressional defense and interior committees a 
joint report that includes the proposed plan within 120 days of 
enactment of this act. If legislation is necessary to implement 
the plan, the Committee directs the Secretaries to submit to 
Congress a legislative proposal to accompany the plan.
    Furthermore, the Committee directs the Deputy Under 
Secretary of Defense for Installations and Environment to 
provide a report to the congressional defense committees not 
later than 180 days after enactment of this act on the 
viability or incompatibility of solar energy for Nellis and 
Creech Air Force Bases.
    Base Security.--The fiscal year 2013 budget request 
includes substantial funding for the Department of Defense 
[DOD] to continue deployment of separate and incompatible 
systems and programs to credential uniform military and DOD 
civilian personnel, vendors, contractors, and visitors, and 
also electronically manage access to military installations. 
The Committee is aware that commercial off-the-shelf solutions 
that provide the technical platform and infrastructure, vendor/
contractor enrollment, vetting, credentialing, and access 
privilege management program and physical access control system 
are in use at over 80 installations at no cost to the 
government. Furthermore, the Committee has been informed that 
demonstrations are underway which expand this solution to 
management of uniform military, DOD civilians, military 
retirees, and military dependants.
    Therefore, the Committee recommends that the Department 
standardize program policy and system requirements for 
personnel credentialing and installation access systems. The 
program policy and system requirements should recognize and 
encourage private sector partnerships utilizing currently 
available qualified systems and programs that can avoid 
substantial out-year acquisition and sustainment costs. The 
Committee directs the Secretary of Defense to report to the 
congressional defense committees within 90 days of enactment of 
this act, the total funding allocated across the Department for 
all personnel credentialing and installation access control 
activities in fiscal year 2013 by appropriation, broken down by 
systems and programs currently in use, systems and programs 
being deployed, systems and programs in research and 
development, and the estimated life-cycle cost avoidance to the 
Department of utilizing qualified private sector systems and 
programs.
    Suicide Prevention.--The Committee applauds the efforts of 
the Department regarding suicide prevention but shares the 
concern of the Secretary of Defense that more can and should be 
done to address this tragic situation. Therefore, the Committee 
encourages the Office of Suicide Prevention to consider funding 
community-based initiatives to include efforts that will assist 
Reserve Component Forces and their families after the 
transitional healthcare period has ended.

                                TITLE I

                           MILITARY PERSONNEL

    Funds appropriated under this title provide the resources 
required for basic pay, retired pay accrual, employers' 
contribution for Social Security taxes, basic allowance for 
subsistence, basic allowance for housing, special and incentive 
pays, permanent change of station travel, and other personnel 
costs for uniformed members of the Armed Forces.
    The President's fiscal year 2013 budget requests a total of 
$128,430,025,000 for military personnel appropriations. This 
request funds an Active component end strength of 1,401,000 and 
a Reserve component end strength of 837,400.

                      SUMMARY OF COMMITTEE ACTION

    The Committee recommends military personnel appropriations 
totaling $127,502,463,000 for fiscal year 2013. This is 
$927,562,000 below the budget estimate.
    Committee recommended military personnel appropriations for 
fiscal year 2013 are summarized below:

                                  SUMMARY OF MILITARY PERSONNEL APPROPRIATIONS
                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                                                    Change from
                             Account                                2013 budget      Committee        budget
                                                                     estimate     recommendation     estimate
----------------------------------------------------------------------------------------------------------------
Military Personnel:
    Military Personnel, Army....................................      40,777,844      40,157,392        -620,452
    Military Personnel, Navy....................................      27,090,893      26,989,384        -101,509
    Military Personnel, Marine Corps............................      12,481,050      12,529,469         +48,419
    Military Personnel, Air Force...............................      28,048,539      28,053,829          +5,290
Reserve Personnel:
    Reserve Personnel, Army.....................................       4,513,753       4,341,823        -171,930
    Reserve Personnel, Navy.....................................       1,898,668       1,875,598         -23,070
    Reserve Personnel, Marine Corps.............................         664,641         659,621          -5,020
    Reserve Personnel, Air Force................................       1,741,365       1,728,505         -12,860
National Guard Personnel:
    National Guard Personnel, Army..............................       8,103,207       8,005,077         -98,130
    National Guard Personnel, Air Force.........................       3,110,065       3,161,765         +51,700
                                                                 -----------------------------------------------
      Total.....................................................     128,430,025     127,502,463        -927,562
----------------------------------------------------------------------------------------------------------------

    Committee recommended end strengths for fiscal year 2013 
are summarized below:

                                            RECOMMENDED END STRENGTH
----------------------------------------------------------------------------------------------------------------
                                                2012           2013 budget        Committee        Change from
                  Item                      authorization       estimate       recommendation    budget estimate
----------------------------------------------------------------------------------------------------------------
Active:
    Army................................           562,000           552,100           552,100  ................
    Navy................................           325,700           322,700           322,700  ................
    Marine Corps........................           202,100           197,300           197,300  ................
    Air Force...........................           332,800           328,900           329,597              +697
                                         -----------------------------------------------------------------------
      Subtotal..........................         1,422,600         1,401,000         1,401,697              +697
                                         =======================================================================
Selected Reserve:
    Army Reserve........................           205,000           205,000           205,000  ................
    Navy Reserve........................            66,200            62,500            62,500  ................
    Marine Corps Reserve................            39,600            39,600            39,600  ................
    Air Force Reserve...................            71,400            70,500            74,428            +3,928
    Army National Guard.................           358,200           358,200           358,200  ................
    Air National Guard..................           106,700           101,600           106,435            +4,835
                                         -----------------------------------------------------------------------
      Subtotal..........................           847,100           837,400           846,163            +8,763
                                         =======================================================================
      TOTAL.............................         2,269,700         2,238,400         2,247,860            +9,460
----------------------------------------------------------------------------------------------------------------

    Committee recommended end strengths for full-time support 
of the Reserve and Guard for fiscal year 2013 are summarized 
below:

                                RECOMMENDED ACTIVE GUARD AND RESERVE END STRENGTH
----------------------------------------------------------------------------------------------------------------
                                                2012           2013 budget        Committee        Change from
                  Item                      authorization       estimate       recommendation    budget estimate
----------------------------------------------------------------------------------------------------------------
Active Guard and Reserve:
    Army Reserve........................            16,261            16,277            16,277  ................
    Navy Reserve........................            10,337            10,114            10,114  ................
    Marine Corps Reserve................             2,261             2,261             2,261  ................
    Air Force Reserve...................             2,662             2,888             2,888  ................
    Army National Guard.................            32,060            32,060            32,060  ................
    Air National Guard..................            14,833            14,871            14,871  ................
                                         -----------------------------------------------------------------------
      TOTAL.............................            78,414            78,471            78,471  ................
----------------------------------------------------------------------------------------------------------------

                      Military Personnel Overview

    Reserve Component Budget Reporting.--The Committee 
continues its requirement for the Department to provide a 
semiannual detailed report to the congressional defense 
committees showing transfers between subactivities within the 
military personnel appropriation. Reports shall be submitted 
not later than 30 days following the end of the second quarter 
and 30 days following the end of the fiscal year.
    Funding for Identified Shortfalls.--The Committee 
recommends an additional $200,000,000 for the Army to address a 
shortfall caused by a costlier officer grade mix and 
$192,000,000 for the Air Force for a housing privatization 
contract award delay from fiscal year 2012 to fiscal year 2013.
    Permanent Change of Station [PCS].--Beginning in 2010, the 
Department of Defense began an effort to find significant 
efficiencies within its budget and continues to pursue 
efficiencies in its programs and operations to identify 
additional savings. The Committee believes that one area that 
has not been addressed and could yield significant savings is 
reducing the number of PCS moves by increasing the length of 
military tours.
    The Department of Defense moves about one-third of all 
military servicemembers each year and the average duration time 
between PCS moves is about 2 years. The Committee believes that 
increasing tour lengths will not only result in cost savings, 
but it will also lead to less stress on the force and hardship 
on families that are forced to move frequently. In addition, 
longer tours will ultimately lead to better performance since 
servicemembers will have more time in a specific job before 
departing. In order to begin the process of decreasing the 
number of PCS moves annually, the Committee recommends a total 
reduction of $293,585,000 across the services. This reduction 
equates to a 10 percent reduction to operational and rotational 
PCS accounts but excludes all PCS moves associated with 
accession, training, and separation.
    Furthermore, the Committee directs the Under Secretary for 
Personnel and Readiness to provide a report to the 
congressional defense committees not later than 180 days after 
the enactment of this act which lays out a plan for the 
Department of Defense to increase the length of tours. The 
report should include an analysis on the impact of increased 
tour lengths for families, quality of life, and job 
performance. It should make recommendations for the services to 
implement if increased tour lengths lead to fewer promotion 
opportunities and PCS options for servicemembers and their 
families serving in hardship locations. Finally, the report 
should identify the cost savings associated with increasing 
tour lengths.
    Unobligated Balances.--A Government Accountability Office 
analysis of past year obligation rates shows that the services 
continue to underexecute their military personnel accounts. Due 
to excess unobligated balances, the Committee recommends a 
total reduction of $74,470,000 from the fiscal year 2013 
military personnel accounts.
    Air National Guard Maintenance Positions.--The Committee 
has been informed that an agreement was reached between the Air 
National Guard and Pacific Air Forces [PACAF] to continue to 
use dual status maintenance technicians to perform maintenance 
on the additional four KC-135 aircraft that were transitioned 
to PACAF in a prior year Base Realignment and Closure 
initiative. This agreement would save the Air Force over 
$6,000,000 since the Air Force would not be required to execute 
permanent change of station moves for 108 active duty airmen to 
perform the mission. This agreement is in jeopardy, however, 
due to Resource Management Directive 703 [RMD 703], which 
freezes civilian end strength at the fiscal year 2010 level. 
The Committee believes that the intent of RMD 703 was to 
produce cost savings, not give the services additional bills to 
pay. Therefore, the Committee strongly encourages the 
Department of Defense to provide exemptions to RMD 703 where 
savings can be identified and achieved.

                        Military Personnel, Army

Appropriations, 2012.................................... $43,298,409,000
Budget estimate, 2013...................................  40,777,844,000
House allowance.........................................  40,730,014,000
Committee recommendation................................  40,157,392,000

    The Committee recommends an appropriation of 
$40,157,392,000. This is $620,452,000 below the budget 
estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                [In thousands of dollars]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2013 budget        House         Committee   -------------------------------
                                         Item                                estimate        allowance    recommendation      Budget           House
                                                                                                                             estimate        allowance
--------------------------------------------------------------------------------------------------------------------------------------------------------

                          MILITARY PERSONNEL, ARMY

     ACTIVITY 1: PAY AND ALLOWANCES OF OFFICERS
     BASIC PAY                                                               6,046,542       6,046,542       6,237,542        +191,000        +191,000
     RETIRED PAY ACCRUAL                                                     1,936,899       1,936,899       1,936,899  ..............  ..............
     BASIC ALLOWANCE FOR HOUSING                                             1,852,895       1,852,895       1,852,895  ..............  ..............
     BASIC ALLOWANCE FOR SUBSISTENCE                                           252,272         252,272         252,272  ..............  ..............
     INCENTIVE PAYS                                                            102,530         102,530         102,530  ..............  ..............
     SPECIAL PAYS                                                              340,023         340,023         340,023  ..............  ..............
     ALLOWANCES                                                                232,696         232,696         232,696  ..............  ..............
     SEPARATION PAY                                                             90,679          90,679          90,679  ..............  ..............
     SOCIAL SECURITY TAX                                                       460,046         460,046         460,046  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 1                                         11,314,582      11,314,582      11,505,582        +191,000        +191,000

     ACTIVITY 2: PAY AND ALLOWANCES OF ENLISTED PERSONNEL
     BASIC PAY                                                              13,198,604      13,198,604      12,548,604        -650,000        -650,000
     RETIRED PAY ACCRUAL                                                     4,233,149       4,233,149       4,233,149  ..............  ..............
     BASIC ALLOWANCE FOR HOUSING                                             4,735,765       4,735,765       4,735,765  ..............  ..............
     INCENTIVE PAYS                                                            114,035         114,035         114,035  ..............  ..............
     SPECIAL PAYS                                                              699,801         687,801         681,801         -18,000          -6,000
     ALLOWANCES                                                                880,308         880,308         880,308  ..............  ..............
     SEPARATION PAY                                                            378,455         378,455         378,455  ..............  ..............
     SOCIAL SECURITY TAX                                                     1,009,678       1,009,678       1,009,678  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 2                                         25,249,795      25,237,795      24,581,795        -668,000        -656,000

     ACTIVITY 3: PAY AND ALLOWANCES OF CADETS
     ACADEMY CADETS                                                             77,680          77,680          77,680  ..............  ..............

     ACTIVITY 4: SUBSISTENCE OF ENLISTED PERSONNEL
     BASIC ALLOWANCE FOR SUBSISTENCE                                         1,357,570       1,357,570       1,357,570  ..............  ..............
     SUBSISTENCE-IN-KIND                                                       753,551         753,551         728,551         -25,000         -25,000
     FAMILY SUBSISTENCE SUPPLEMENTAL ALLOWANCE                                   1,911           1,911           1,911  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 4                                          2,113,032       2,113,032       2,088,032         -25,000         -25,000

     ACTIVITY 5: PERMANENT CHANGE OF STATION
     ACCESSION TRAVEL                                                          163,294         163,294         163,294  ..............  ..............
     TRAINING TRAVEL                                                           167,995         167,995         167,995  ..............  ..............
     OPERATIONAL TRAVEL                                                        495,917         495,917         446,325         -49,592         -49,592
     ROTATIONAL TRAVEL                                                         677,396         677,396         609,656         -67,740         -67,740
     SEPARATION TRAVEL                                                         193,262         193,262         193,262  ..............  ..............
     TRAVEL OF ORGANIZED UNITS                                                  12,150          12,150          12,150  ..............  ..............
     NON-TEMPORARY STORAGE                                                       9,726           9,726           9,726  ..............  ..............
     TEMPORARY LODGING EXPENSE                                                  67,841          67,841          67,841  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 5                                          1,787,581       1,787,581       1,670,249        -117,332        -117,332

     ACTIVITY 6: OTHER MILITARY PERSONNEL COSTS
     APPREHENSION OF MILITARY DESERTERS                                          1,434           1,434           1,434  ..............  ..............
     INTEREST ON UNIFORMED SERVICES SAVINGS                                        687             687             687  ..............  ..............
     DEATH GRATUITIES                                                           62,800          62,800          62,800  ..............  ..............
     UNEMPLOYMENT BENEFITS                                                     264,874         264,874         264,874  ..............  ..............
     EDUCATION BENEFITS                                                            698             698             698  ..............  ..............
     ADOPTION EXPENSES                                                             494             494             494  ..............  ..............
     TRANSPORTATION SUBSIDY                                                      7,436           7,436           7,436  ..............  ..............
     PARTIAL DISLOCATION ALLOWANCE                                                 428             428             428  ..............  ..............
     RESERVE OFFICERS TRAINING CORPS [ROTC]                                    107,370         107,370         107,370  ..............  ..............
     JUNIOR ROTC                                                                42,845          42,845          42,845  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 6                                            489,066         489,066         489,066  ..............  ..............

     LESS REIMBURSABLES                                                       -253,892        -253,892        -253,892  ..............  ..............

     UNDISTRIBUTED ADJUSTMENT                                           ..............         -35,830          -1,120          -1,120         +34,710
                                                                       =================================================================================
           TOTAL, ACTIVE FORCES, ARMY                                       40,777,844      40,730,014      40,157,392        -620,452        -572,622
                                                                       ---------------------------------------------------------------------------------
           TOTAL, MILITARY PERSONNEL, ARMY                                  40,777,844      40,730,014      40,157,392        -620,452        -572,622
--------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                    2013 budget      Committee      Change from
Line                             Item                                 request     recommendation  budget request
----------------------------------------------------------------------------------------------------------------
     BA 1: PAY AND ALLOWANCES OF OFFICERS

   5 Basic Pay                                                       6,046,542       6,237,542        +191,000
         Lower than Budgeted Strength Levels                    ..............  ..............          -9,000
         Army Identified Shortfall for Officer Pay              ..............  ..............        +200,000

     BA 2: PAY AND ALLOWANCES OF ENLISTED PERSONNEL

  60 Basic Pay                                                      13,198,604      12,548,604        -650,000
         Lower than Budgeted Strength Levels                    ..............  ..............         -50,000
         Army Requested Transfer to Title IX: Basic Pay         ..............  ..............        -182,000
          Officers
         Army Requested Transfer to Title IX: Basic Pay         ..............  ..............        -418,000
          Enlisted
  90 Special Pays                                                      699,801         681,801         -18,000
         Enlistment Bonuses--Army Requested Transfer to Loan    ..............  ..............         -18,000
          Repayment Program
         Reenlistment Bonuses--Excess to Requirement            ..............  ..............         -18,000
         Loan Repayment Program--Army Requested Transfer from   ..............  ..............         +18,000
          Enlistment Bonuses to Meet Identified Shortfall

     BA 4: SUBSISTENCE OF ENLISTED PERSONNEL

 120 Subsistence-In-Kind                                               753,551         728,551         -25,000
         Army Requested Transfer to Title IX: Subsistence-In-   ..............  ..............         -25,000
          Kind

     BA 5: PERMANENT CHANGE OF STATION TRAVEL

 135 Operational Travel                                                495,917         446,325         -49,592
         PCS Reduction                                          ..............  ..............         -49,592
 140 Rotational Travel                                                 677,396         609,656         -67,740
         PCS Reduction                                          ..............  ..............         -67,740

     UNDISTRIBUTED ADJUSTMENT
         Unobligated Balances                                   ..............          -1,120          -1,120
----------------------------------------------------------------------------------------------------------------

                        Military Personnel, Navy

Appropriations, 2012.................................... $26,803,334,000
Budget estimate, 2013...................................  27,090,893,000
House allowance.........................................  27,075,933,000
Committee recommendation................................  26,989,384,000

    The Committee recommends an appropriation of 
$26,989,384,000. This is $101,509,000 below the budget 
estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                [In thousands of dollars]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2013 budget        House         Committee   -------------------------------
                                         Item                                estimate        allowance    recommendation      Budget           House
                                                                                                                             estimate        allowance
--------------------------------------------------------------------------------------------------------------------------------------------------------
                          MILITARY PERSONNEL, NAVY

     ACTIVITY 1: PAY AND ALLOWANCES OF OFFICERS
     BASIC PAY                                                               3,949,301       3,952,572       3,949,301  ..............          -3,271
     RETIRED PAY ACCRUAL                                                     1,266,753       1,267,803       1,266,753  ..............          -1,050
     BASIC ALLOWANCE FOR HOUSING                                             1,381,431       1,382,432       1,381,431  ..............          -1,001
     BASIC ALLOWANCE FOR SUBSISTENCE                                           158,373         158,494         158,373  ..............            -121
     INCENTIVE PAYS                                                            135,303         135,303         135,303  ..............  ..............
     SPECIAL PAYS                                                              423,059         423,059         423,059  ..............  ..............
     ALLOWANCES                                                                108,203         108,203         108,203  ..............  ..............
     SEPARATION PAY                                                             33,001          27,308          27,308          -5,693  ..............
     SOCIAL SECURITY TAX                                                       300,287         300,537         300,287  ..............            -250
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 1                                          7,755,711       7,755,711       7,750,018          -5,693          -5,693

     ACTIVITY 2: PAY AND ALLOWANCES OF ENLISTED PERSONNEL
     BASIC PAY                                                               8,439,026       8,458,028       8,439,026  ..............         -19,002
     RETIRED PAY ACCRUAL                                                     2,708,787       2,714,887       2,708,787  ..............          -6,100
     BASIC ALLOWANCE FOR HOUSING                                             3,864,310       3,870,228       3,864,310  ..............          -5,918
     INCENTIVE PAYS                                                            101,491         101,491         101,491  ..............  ..............
     SPECIAL PAYS                                                              699,482         699,482         699,482  ..............  ..............
     ALLOWANCES                                                                515,163         515,163         515,163  ..............  ..............
     SEPARATION PAY                                                            229,632         196,489         196,489         -33,143  ..............
     SOCIAL SECURITY TAX                                                       645,586         647,040         645,586  ..............          -1,454
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 2                                         17,203,477      17,202,808      17,170,334         -33,143         -32,474

     ACTIVITY 3: PAY AND ALLOWANCES OF MIDSHIPMEN
     MIDSHIPMEN                                                                 76,628          76,628          76,628  ..............  ..............

     ACTIVITY 4: SUBSISTENCE OF ENLISTED PERSONNEL
     BASIC ALLOWANCE FOR SUBSISTENCE                                           751,528         752,197         751,528  ..............            -669
     SUBSISTENCE-IN-KIND                                                       429,247         429,247         429,247  ..............  ..............
     FAMILY SUBSISTENCE SUPPLEMENTAL ALLOWANCE                                      13              13              13  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 4                                          1,180,788       1,181,457       1,180,788  ..............            -669

     ACTIVITY 5: PERMANENT CHANGE OF STATION
     ACCESSION TRAVEL                                                           90,302          90,302          90,302  ..............  ..............
     TRAINING TRAVEL                                                           119,663         119,663         119,663  ..............  ..............
     OPERATIONAL TRAVEL                                                        271,324         271,324         244,192         -27,132         -27,132
     ROTATIONAL TRAVEL                                                         313,309         313,309         281,978         -31,331         -31,331
     SEPARATION TRAVEL                                                         138,273         138,273         138,273  ..............  ..............
     TRAVEL OF ORGANIZED UNITS                                                  24,342          24,342          24,342  ..............  ..............
     NON-TEMPORARY STORAGE                                                       5,700           5,700           5,700  ..............  ..............
     TEMPORARY LODGING EXPENSE                                                   6,426           6,426           6,426  ..............  ..............
     OTHER                                                                       5,622           5,622           5,622  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 5                                            974,961         974,961         916,498         -58,463         -58,463

     ACTIVITY 6: OTHER MILITARY PERSONNEL COSTS
     APPREHENSION OF MILITARY DESERTERS                                            262             262             262  ..............  ..............
     INTEREST ON UNIFORMED SERVICES SAVINGS                                      2,464           2,464           2,464  ..............  ..............
     DEATH GRATUITIES                                                           16,100          16,100          16,100  ..............  ..............
     UNEMPLOYMENT BENEFITS                                                     103,735         106,735         103,735  ..............          -3,000
     EDUCATION BENEFITS                                                         23,758          23,758          20,758          -3,000          -3,000
     ADOPTION EXPENSES                                                             275             275             275  ..............  ..............
     TRANSPORTATION SUBSIDY                                                      6,254           6,254           6,254  ..............  ..............
     PARTIAL DISLOCATION ALLOWANCE                                                  57              57              57  ..............  ..............
     ROTC                                                                       22,945          22,945          22,945  ..............  ..............
     JUNIOR ROTC                                                                12,784          12,784          12,784  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 6                                            188,634         191,634         185,634          -3,000          -6,000

     LESS REIMBURSABLES                                                       -289,306        -289,306        -289,306  ..............  ..............

     UNDISTRIBUTED ADJUSTMENT                                           ..............         -17,960          -1,210          -1,210         +16,750
                                                                       =================================================================================
           TOTAL, ACTIVE FORCES, NAVY                                       27,090,893      27,075,933      26,989,384        -101,509         -86,549
                                                                       ---------------------------------------------------------------------------------
           TOTAL, MILITARY PERSONNEL, NAVY                                  27,090,893      27,075,933      26,989,384        -101,509         -86,549
--------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                                                    Change from
Line                             Item                               2013 budget      Committee        budget
                                                                     estimate     recommendation     estimate
----------------------------------------------------------------------------------------------------------------
     BA 1: PAY AND ALLOWANCES OF OFFICERS

  50 Separation Pay                                                     33,001          27,308          -5,693
         Retain Four Cruisers                                   ..............  ..............          -5,693

     BA 2: PAY AND ALLOWANCES OF ENLISTED PERSONNEL

 100 Separation Pay                                                    229,632         196,489         -33,143
         Retain Four Cruisers                                   ..............  ..............         -33,143

     BA 5: PERMANENT CHANGE OF STATION TRAVEL

 135 Operational Travel                                                271,324         244,192         -27,132
         PCS Reduction                                          ..............  ..............         -27,132
 140 Rotational Travel                                                 313,309         281,978         -31,331
         PCS Reduction                                          ..............  ..............         -31,331

     BA 6: OTHER MILITARY PERSONNEL COSTS

 195 Education Benefits                                                 23,758          20,758          -3,000
         Excess to Requirement                                  ..............  ..............          -3,000

     UNDISTRIBUTED ADJUSTMENT
         Unobligated Balances                                   ..............          -1,210          -1,210
----------------------------------------------------------------------------------------------------------------

                    Military Personnel, Marine Corps

Appropriations, 2012.................................... $13,635,136,000
Budget estimate, 2013...................................  12,481,050,000
House allowance.........................................  12,560,999,000
Committee recommendation................................  12,529,469,000

    The Committee recommends an appropriation of 
$12,529,469,000. This is $48,419,000 above the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                [In thousands of dollars]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2013 budget        House         Committee   -------------------------------
                                         Item                                estimate        allowance    recommendation      Budget           House
                                                                                                                             estimate        allowance
--------------------------------------------------------------------------------------------------------------------------------------------------------

                      MILITARY PERSONNEL, MARINE CORPS

     ACTIVITY 1: PAY AND ALLOWANCES OF OFFICERS
     BASIC PAY                                                               1,331,519       1,331,519       1,331,519  ..............  ..............
     RETIRED PAY ACCRUAL                                                       427,088         427,088         427,088  ..............  ..............
     BASIC ALLOWANCE FOR HOUSING                                               446,183         446,183         446,183  ..............  ..............
     BASIC ALLOWANCE FOR SUBSISTENCE                                            57,318          57,318          57,318  ..............  ..............
     INCENTIVE PAYS                                                             52,549          52,549          47,549          -5,000          -5,000
     SPECIAL PAYS                                                               21,356          21,356          21,356  ..............  ..............
     ALLOWANCES                                                                 35,637          35,637          35,637  ..............  ..............
     SEPARATION PAY                                                             15,056          39,459          39,459         +24,403  ..............
     SOCIAL SECURITY TAX                                                       100,832         100,832         100,832  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 1                                          2,487,538       2,511,941       2,506,941         +19,403          -5,000

     ACTIVITY 2: PAY AND ALLOWANCES OF ENLISTED PERSONNEL
     BASIC PAY                                                               4,617,777       4,617,777       4,601,777         -16,000         -16,000
     RETIRED PAY ACCRUAL                                                     1,478,142       1,478,142       1,478,142  ..............  ..............
     BASIC ALLOWANCE FOR HOUSING                                             1,639,289       1,639,289       1,639,289  ..............  ..............
     INCENTIVE PAYS                                                              9,832           9,832           9,832  ..............  ..............
     SPECIAL PAYS                                                              165,326         165,326         151,326         -14,000         -14,000
     ALLOWANCES                                                                302,682         302,682         299,682          -3,000          -3,000
     SEPARATION PAY                                                             71,143         164,337         164,337         +93,194  ..............
     SOCIAL SECURITY TAX                                                       352,300         352,300         352,300  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 2                                          8,636,491       8,729,685       8,696,685         +60,194         -33,000

     ACTIVITY 4: SUBSISTENCE OF ENLISTED PERSONNEL
     BASIC ALLOWANCE FOR SUBSISTENCE                                           421,262         421,262         421,262  ..............  ..............
     SUBSISTENCE-IN-KIND                                                       315,470         315,470         315,470  ..............  ..............
     FAMILY SUBSISTENCE SUPPLEMENTAL ALLOWANCE                                      50              50              50  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 4                                            736,782         736,782         736,782  ..............  ..............

     ACTIVITY 5: PERMANENT CHANGE OF STATION
     ACCESSION TRAVEL                                                           65,546          65,546          60,546          -5,000          -5,000
     TRAINING TRAVEL                                                            13,060          13,060          13,060  ..............  ..............
     OPERATIONAL TRAVEL                                                        222,404         222,404         200,164         -22,240         -22,240
     ROTATIONAL TRAVEL                                                         104,397         104,397          93,957         -10,440         -10,440
     SEPARATION TRAVEL                                                          84,374          88,506          88,506          +4,132  ..............
     TRAVEL OF ORGANIZED UNITS                                                     768             768             768  ..............  ..............
     NON-TEMPORARY STORAGE                                                       6,600           6,600           6,600  ..............  ..............
     TEMPORARY LODGING EXPENSE                                                  14,621          14,621          14,621  ..............  ..............
     OTHER                                                                       3,387           3,387           3,387  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 5                                            515,157         519,289         481,609         -33,548         -37,680

     ACTIVITY 6: OTHER MILITARY PERSONNEL COSTS
     APPREHENSION OF MILITARY DESERTERS                                            968             968             968  ..............  ..............
     INTEREST ON UNIFORMED SERVICES SAVINGS                                         19              19              19  ..............  ..............
     DEATH GRATUITIES                                                           10,100          10,100          10,100  ..............  ..............
     UNEMPLOYMENT BENEFITS                                                     104,060         112,060         112,060          +8,000  ..............
     EDUCATION BENEFITS                                                          4,105           4,105           4,105  ..............  ..............
     ADOPTION EXPENSES                                                              73              73              73  ..............  ..............
     TRANSPORTATION SUBSIDY                                                      3,048           3,048           3,048  ..............  ..............
     PARTIAL DISLOCATION ALLOWANCE                                                 159             159             159  ..............  ..............
     JUNIOR ROTC                                                                 5,911           5,911           5,911  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 6                                            128,443         136,443         136,443          +8,000  ..............

     LESS REIMBURSABLES                                                        -23,361         -23,361         -23,361  ..............  ..............

     UNDISTRIBUTED ADJUSTMENT                                           ..............         -49,780          -5,630          -5,630         +44,150
                                                                       =================================================================================
           TOTAL, ACTIVE FORCES, MARINE CORPS                               12,481,050      12,560,999      12,529,469         +48,419         -31,530
                                                                       ---------------------------------------------------------------------------------
           TOTAL, MILITARY PERSONNEL, MARINE CORPS                          12,481,050      12,560,999      12,529,469         +48,419         -31,530
--------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                                                    Change from
Line                             Item                               2013 budget      Committee        budget
                                                                     estimate     recommendation     estimate
----------------------------------------------------------------------------------------------------------------
     BA 1: PAY AND ALLOWANCES OF OFFICERS

  35 Incentive Pays                                                     52,549          47,549          -5,000
         Aviation Continuation Bonus--Excess to Requirement     ..............  ..............          -5,000
  50 Separation Pay                                                     15,056          39,459         +24,403
         Marine Corps Requested Transfer from Procurement,      ..............  ..............         +24,403
          Marine Corps Line 2 to Meet Identified Shortfall

     BA 2: PAY AND ALLOWANCES OF ENLISTED PERSONNEL

  60 Basic Pay                                                       4,617,777       4,601,777         -16,000
         Lower than Budgeted Strength Levels                    ..............  ..............         -16,000
  90 Special Pays                                                      165,326         151,326         -14,000
         Hardship/Location Pays--Projected Underexecution       ..............  ..............          -4,000
         Reenlistment Bonuses--Excess to Requirement            ..............  ..............         -10,000
  95 Allowances                                                        302,682         299,682          -3,000
         Clothing Allowance--Projected Underexecution           ..............  ..............          -3,000
 100 Separation Pay                                                     71,143         164,337         +93,194
         Marine Corps Requested Transfer from Procurement,      ..............  ..............         +93,194
          Marine Corps Line 2 to Meet Identified Shortfall

     BA 5: PERMANENT CHANGE OF STATION TRAVEL

 125 Accession Travel                                                   65,546          60,546          -5,000
         Lower than Budgeted Strength Levels                    ..............  ..............          -5,000
 135 Operational Travel                                                222,404         200,164         -22,240
         PCS Reduction                                          ..............  ..............         -22,240
 140 Rotational Travel                                                 104,397          93,957         -10,440
         PCS Reduction                                          ..............  ..............         -10,440
 145 Separation Travel                                                  84,374          88,506          +4,132
         Marine Corps Requested Transfer from Procurement,      ..............  ..............          +4,132
          Marine Corps Line 2 to Meet Identified Shortfall

     BA 6: OTHER MILITARY PERSONNEL COSTS

 185 Unemployment Benefits                                             104,060         112,060          +8,000
         Marine Corps Requested Transfer from Procurement,      ..............  ..............          +8,000
          Marine Corps Line 2 to Meet Identified Shortfall

     UNDISTRIBUTED ADJUSTMENT
         Unobligated Balances                                   ..............          -5,630          -5,630
----------------------------------------------------------------------------------------------------------------

                     Military Personnel, Air Force

Appropriations, 2012.................................... $28,096,708,000
Budget estimate, 2013...................................  28,048,539,000
House allowance.........................................  28,124,109,000
Committee recommendation................................  28,053,829,000

    The Committee recommends an appropriation of 
$28,053,829,000. This is $5,290,000 above the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                [In thousands of dollars]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2013 budget        House         Committee   -------------------------------
                                         Item                                estimate        allowance    recommendation      Budget           House
                                                                                                                             estimate        allowance
--------------------------------------------------------------------------------------------------------------------------------------------------------
                       MILITARY PERSONNEL, AIR FORCE

     ACTIVITY 1: PAY AND ALLOWANCES OF OFFICERS
     BASIC PAY                                                               4,879,598       4,857,898       4,829,598         -50,000         -28,300
     RETIRED PAY ACCRUAL                                                     1,558,889       1,558,889       1,543,889         -15,000         -15,000
     BASIC ALLOWANCE FOR HOUSING                                             1,398,746       1,423,346       1,437,946         +39,200         +14,600
     BASIC ALLOWANCE FOR SUBSISTENCE                                           196,731         196,731         196,731  ..............  ..............
     INCENTIVE PAYS                                                            218,362         218,362         218,362  ..............  ..............
     SPECIAL PAYS                                                              303,583         303,583         303,583  ..............  ..............
     ALLOWANCES                                                                142,100         142,100         142,100  ..............  ..............
     SEPARATION PAY                                                             61,644          61,644          61,644  ..............  ..............
     SOCIAL SECURITY TAX                                                       371,372         371,372         371,372  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 1                                          9,131,025       9,133,925       9,105,225         -25,800         -28,700

     ACTIVITY 2: PAY AND ALLOWANCES OF ENLISTED PERSONNEL
     BASIC PAY                                                               8,715,826       8,715,826       8,715,826  ..............  ..............
     RETIRED PAY ACCRUAL                                                     2,789,838       2,789,838       2,789,838  ..............  ..............
     BASIC ALLOWANCE FOR HOUSING                                             3,361,407       3,456,507       3,514,207        +152,800         +57,700
     INCENTIVE PAYS                                                             40,899          40,899          40,899  ..............  ..............
     SPECIAL PAYS                                                              363,794         363,794         363,794  ..............  ..............
     ALLOWANCES                                                                590,662         590,662         590,662  ..............  ..............
     SEPARATION PAY                                                            137,532         137,532         137,532  ..............  ..............
     SOCIAL SECURITY TAX                                                       666,760         666,760         666,760  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 2                                         16,666,718      16,761,818      16,819,518        +152,800         +57,700

     ACTIVITY 3: PAY AND ALLOWANCES OF CADETS
     ACADEMY CADETS                                                             70,369          70,369          70,369  ..............  ..............

     ACTIVITY 4: SUBSISTENCE OF ENLISTED PERSONNEL
     BASIC ALLOWANCE FOR SUBSISTENCE                                         1,008,796       1,008,796       1,008,796  ..............  ..............
     SUBSISTENCE-IN-KIND                                                       146,157         146,157         146,157  ..............  ..............
     FAMILY SUBSISTENCE SUPPLEMENTAL ALLOWANCE                                      34              34              34  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 4                                          1,154,987       1,154,987       1,154,987  ..............  ..............

     ACTIVITY 5: PERMANENT CHANGE OF STATION
     ACCESSION TRAVEL                                                           87,255          87,255          87,255  ..............  ..............
     TRAINING TRAVEL                                                            75,236          75,236          70,236          -5,000          -5,000
     OPERATIONAL TRAVEL                                                        320,117         320,117         288,105         -32,012         -32,012
     ROTATIONAL TRAVEL                                                         530,984         530,984         447,886         -83,098         -83,098
     SEPARATION TRAVEL                                                         187,760         187,760         158,760         -29,000         -29,000
     TRAVEL OF ORGANIZED UNITS                                                  15,779          15,779          15,779  ..............  ..............
     NON-TEMPORARY STORAGE                                                      42,843          42,843          42,843  ..............  ..............
     TEMPORARY LODGING EXPENSE                                                  30,281          30,281          30,281  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 5                                          1,290,255       1,290,255       1,141,145        -149,110        -149,110

     ACTIVITY 6: OTHER MILITARY PERSONNEL COSTS
     APPREHENSION OF MILITARY DESERTERS                                            149             149             149  ..............  ..............
     INTEREST ON UNIFORMED SERVICES SAVINGS                                      2,514           2,514           2,514  ..............  ..............
     DEATH GRATUITIES                                                           16,000          16,000          16,000  ..............  ..............
     UNEMPLOYMENT BENEFITS                                                      71,683          71,683          71,683  ..............  ..............
     EDUCATION BENEFITS                                                            340             340             340  ..............  ..............
     ADOPTION EXPENSES                                                             519             519             519  ..............  ..............
     TRANSPORTATION SUBSIDY                                                      5,326           5,326           5,326  ..............  ..............
     PARTIAL DISLOCATION ALLOWANCE                                               1,975           1,975           1,975  ..............  ..............
     RESERVE OFFICERS TRAINING CORPS [ROTC]                                     37,228          37,228          37,228  ..............  ..............
     JUNIOR ROTC                                                                16,565          16,565          16,565  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 6                                            152,299         152,299         152,299  ..............  ..............

     LESS REIMBURSABLES                                                       -417,114        -417,114        -417,114  ..............  ..............

     UNDISTRIBUTED ADJUSTMENT                                           ..............         -22,430          27,400         +27,400         +49,830
                                                                       =================================================================================
           TOTAL, ACTIVE FORCES, AIR FORCE                                  28,048,539      28,124,109      28,053,829          +5,290         -70,280
                                                                       ---------------------------------------------------------------------------------
           TOTAL, MILITARY PERSONNEL, AIR FORCE                             28,048,539      28,124,109      28,053,829          +5,290         -70,280
--------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                            2013 budget      Committee      Change from
 Line         Item           estimate     recommendation  budget request
------------------------------------------------------------------------
       BA 1: PAY AND
        ALLOWANCES OF
        OFFICERS

     5 Basic Pay             4,879,598       4,829,598         -50,000
           Lower than   ..............  ..............         -50,000
            Budgeted
            Strength
            Levels
    10 Retired Pay           1,558,889       1,543,889         -15,000
        Accrual
           Lower than   ..............  ..............         -15,000
            Budgeted
            Strength
            Levels
    25 Basic Allowance       1,398,746       1,437,946         +39,200
        For Housing
           Air Force    ..............  ..............         +39,200
            Identified
            Shortfall

       BA 2: PAY AND
        ALLOWANCES OF
        ENLISTED
        PERSONNEL

    80 Basic Allowance       3,361,407       3,514,207        +152,800
        For Housing
           Air Force    ..............  ..............        +152,800
            Identified
            Shortfall

       BA 5: PERMANENT
        CHANGE OF
        STATION TRAVEL

   130 Training Travel          75,236          70,236          -5,000
           Excess to    ..............  ..............          -5,000
            Requiremen
            t
   135 Operational             320,117         288,105         -32,012
        Travel
           PCS          ..............  ..............         -32,012
            Reduction
   140 Rotational              530,984         447,886         -83,098
        Travel
           Excess to    ..............  ..............         -30,000
            Requiremen
            t
           PCS          ..............  ..............         -53,098
            Reduction
   145 Separation              187,760         158,760         -29,000
        Travel
           Excess to    ..............  ..............         -29,000
            Requiremen
            t

       UNDISTRIBUTED
        ADJUSTMENT
           Retain Air   ..............          27,400         +27,400
            Force
            Force
            Structure
------------------------------------------------------------------------

                        Reserve Personnel, Army

Appropriations, 2012....................................  $4,289,407,000
Budget estimate, 2013...................................   4,513,753,000
House allowance.........................................   4,456,823,000
Committee recommendation................................   4,341,823,000

    The Committee recommends an appropriation of 
$4,341,823,000. This is $171,930,000 below the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                [In thousands of dollars]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2013 budget        House         Committee   -------------------------------
                                         Item                                estimate        allowance    recommendation      Budget           House
                                                                                                                             estimate        allowance
--------------------------------------------------------------------------------------------------------------------------------------------------------

                          RESERVE PERSONNEL, ARMY

     ACTIVITY 1: RESERVE COMPONENT TRAINING AND SUPPORT
     PAY GROUP A TRAINING (15 DAYS AND DRILLS 24/48)                         1,447,614       1,447,614       1,411,614         -36,000         -36,000
     PAY GROUP B TRAINING (BACKFILL FOR ACTIVE DUTY)                            38,868          38,868          38,868  ..............  ..............
     PAY GROUP F TRAINING (RECRUITS)                                           275,318         275,318         260,318         -15,000         -15,000
     PAY GROUP P TRAINING (PIPELINE RECRUITS)                                   12,665          12,665          12,665  ..............  ..............
     MOBILIZATION TRAINING                                                       7,473           7,473           7,473  ..............  ..............
     SCHOOL TRAINING                                                           216,544         216,544         216,544  ..............  ..............
     SPECIAL TRAINING                                                          283,620         283,620         283,620  ..............  ..............
     ADMINISTRATION AND SUPPORT                                              2,060,896       2,044,896       1,969,896         -91,000         -75,000
     EDUCATION BENEFITS                                                         41,063          41,063          41,063  ..............  ..............
     HEALTH PROFESSION SCHOLARSHIP                                              66,834          66,834          66,834  ..............  ..............
     OTHER PROGRAMS                                                             62,858          62,858          62,858  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 1                                          4,513,753       4,497,753       4,371,753        -142,000        -126,000

     UNDISTRIBUTED ADJUSTMENT                                           ..............         -40,930         -29,930         -29,930         +11,000
                                                                       ---------------------------------------------------------------------------------
           TOTAL RESERVE PERSONNEL, ARMY                                     4,513,753       4,456,823       4,341,823        -171,930        -115,000
--------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                            2013 budget      Committee      Change from
 Line         Item           estimate     recommendation  budget request
------------------------------------------------------------------------
       BA 1: UNIT AND
        INDIVIDUAL
        TRAINING

    10 Pay Group A           1,447,614       1,411,614         -36,000
        Training (15
        Days & Drills
        24/48)
           Lower than   ..............  ..............         -36,000
            Budgeted
            Strength
            Levels
    30 Pay Group F             275,318         260,318         -15,000
        Training
        (Recruits)
           Projected    ..............  ..............         -15,000
            Underexecu
            tion
    90 Administration        2,060,896       1,969,896         -91,000
        and Support
           Pay and      ..............  ..............         -91,000
            Allowances
            -Lower
            than
            Budgeted
            Strength
            Levels

       UNDISTRIBUTED
        ADJUSTMENT
           Unobligated  ..............         -29,930         -29,930
            Balances
------------------------------------------------------------------------

                        Reserve Personnel, Navy

Appropriations, 2012....................................  $1,935,544,000
Budget estimate, 2013...................................   1,898,668,000
House allowance.........................................   1,871,688,000
Committee recommendation................................   1,875,598,000

    The Committee recommends an appropriation of 
$1,875,598,000. This is $23,070,000 below the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                [In thousands of dollars]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2013 budget        House         Committee   -------------------------------
                                         Item                                estimate        allowance    recommendation      Budget           House
                                                                                                                             estimate        allowance
--------------------------------------------------------------------------------------------------------------------------------------------------------

                          RESERVE PERSONNEL, NAVY

     ACTIVITY 1: RESERVE COMPONENT TRAINING AND SUPPORT
     PAY GROUP A TRAINING (15 DAYS AND DRILLS 24/48)                           607,595         607,595         602,595          -5,000          -5,000
     PAY GROUP B TRAINING (BACKFILL FOR ACTIVE DUTY)                             9,459           9,459           9,459  ..............  ..............
     PAY GROUP F TRAINING (RECRUITS)                                            51,028          51,028          51,028  ..............  ..............
     MOBILIZATION TRAINING                                                       9,037           9,037           9,037  ..............  ..............
     SCHOOL TRAINING                                                            53,791          53,791          53,791  ..............  ..............
     SPECIAL TRAINING                                                           96,138          96,138          96,138  ..............  ..............
     ADMINISTRATION AND SUPPORT                                              1,009,599       1,009,599       1,003,399          -6,200          -6,200
     EDUCATION BENEFITS                                                          1,377           1,377           1,377  ..............  ..............
     HEALTH PROFESSION SCHOLARSHIP                                              60,644          60,644          60,644  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 1                                          1,898,668       1,898,668       1,887,468         -11,200         -11,200

     UNDISTRIBUTED ADJUSTMENT                                           ..............         -26,980         -11,870         -11,870         +15,110
                                                                       ---------------------------------------------------------------------------------
           TOTAL, RESERVE PERSONNEL, NAVY                                    1,898,668       1,871,688       1,875,598         -23,070          +3,910
--------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                                                    Change from
Line                             Item                               2013 budget      Committee        budget
                                                                     estimate     recommendation     estimate
----------------------------------------------------------------------------------------------------------------
     BA 1: UNIT AND INDIVIDUAL TRAINING

  10 Pay Group A Training (15 Days & Drills 24/48)                     607,595         602,595          -5,000
         Inactive Duty Training--Unjustified Growth             ..............  ..............          -5,000
  90 Administration and Support                                      1,009,599       1,003,399          -6,200
         Prior Service Enlistment Bonuses--Excess to Require-   ..............  ..............          -1,200
          ment
         Officer Retention Bonuses--Excess to Requirement       ..............  ..............          -5,000

     UNDISTRIBUTED ADJUSTMENT
         Unobligated Balances                                   ..............         -11,870         -11,870
----------------------------------------------------------------------------------------------------------------

                    Reserve Personnel, Marine Corps

Appropriations, 2012....................................    $644,722,000
Budget estimate, 2013...................................     664,641,000
House allowance.........................................     651,861,000
Committee recommendation................................     659,621,000

    The Committee recommends an appropriation of $659,621,000. 
This is $5,020,000 below the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                [In thousands of dollars]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2013 budget        House         Committee   -------------------------------
                                         Item                                estimate        allowance    recommendation      Budget           House
                                                                                                                             estimate        allowance
--------------------------------------------------------------------------------------------------------------------------------------------------------

                      RESERVE PERSONNEL, MARINE CORPS

     ACTIVITY 1: RESERVE COMPONENT TRAINING AND SUPPORT
     PAY GROUP A TRAINING (15 DAYS AND DRILLS 24/48)                           222,952         221,952         222,952  ..............          +1,000
     PAY GROUP B TRAINING (BACKFILL FOR ACT DUTY)                               32,908          32,908          32,908  ..............  ..............
     PAY GROUP F TRAINING (RECRUITS)                                           124,226         124,226         124,226  ..............  ..............
     MOBILIZATION TRAINING                                                       2,239           2,239           2,239  ..............  ..............
     SCHOOL TRAINING                                                            11,164          11,164          11,164  ..............  ..............
     SPECIAL TRAINING                                                           19,927          20,927          19,927  ..............          -1,000
     ADMINISTRATION AND SUPPORT                                                233,056         233,056         233,056  ..............  ..............
     PLATOON LEADER CLASS                                                       11,759          11,759          11,759  ..............  ..............
     EDUCATION BENEFITS                                                          6,410           6,410           6,410  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 1                                            664,641         664,641         664,641  ..............  ..............

     UNDISTRIBUTED ADJUSTMENT                                           ..............         -12,780          -5,020          -5,020          +7,760
                                                                       ---------------------------------------------------------------------------------
           TOTAL, RESERVE PERSONNEL, MARINE CORPS                              664,641         651,861         659,621          -5,020          +7,760
--------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                                                    Change from
                                     Item                           2013 budget      Committee        budget
                                                                     estimate     recommendation     estimate
----------------------------------------------------------------------------------------------------------------
     UNDISTRIBUTED ADJUSTMENT
         Unobligated Balances                                   ..............          -5,020          -5,020
----------------------------------------------------------------------------------------------------------------

                      Reserve Personnel, Air Force

Appropriations, 2012....................................  $1,712,705,000
Budget estimate, 2013...................................   1,741,365,000
House allowance.........................................   1,743,875,000
Committee recommendation................................   1,728,505,000

    The Committee recommends an appropriation of 
$1,728,505,000. This is $12,860,000 below the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                [In thousands of dollars]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2013 budget        House         Committee   -------------------------------
                                         Item                                estimate        allowance    recommendation      Budget           House
                                                                                                                             estimate        allowance
--------------------------------------------------------------------------------------------------------------------------------------------------------

                        RESERVE PERSONNEL, AIR FORCE

     ACTIVITY 1: RESERVE COMPONENT TRAINING AND SUPPORT
     PAY GROUP A TRAINING (15 DAYS AND DRILLS 24/48)                           698,550         698,550         698,550  ..............  ..............
     PAY GROUP B TRAINING (BACKFILL FOR ACTIVE DUTY)                           103,514         103,514         103,514  ..............  ..............
     PAY GROUP F TRAINING (RECRUITS)                                            64,919          64,919          64,919  ..............  ..............
     PAY GROUP P TRAINING (PIPELINE RECRUITS)                                       50              50              50  ..............  ..............
     MOBILIZATION TRAINING                                                         773             773             773  ..............  ..............
     SCHOOL TRAINING                                                           146,738         146,738         146,738  ..............  ..............
     SPECIAL TRAINING                                                          277,193         277,193         277,193  ..............  ..............
     ADMINISTRATION AND SUPPORT                                                372,149         372,149         350,149         -22,000         -22,000
     EDUCATION BENEFITS                                                         17,512          17,512          17,512  ..............  ..............
     HEALTH PROFESSION SCHOLARSHIP                                              55,095          55,095          55,095  ..............  ..............
     OTHER PROGRAMS (ADMINISTRATION AND SUPPORT)                                 4,872           4,872           4,872  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 1                                          1,741,365       1,741,365       1,719,365         -22,000         -22,000

     UNDISTRIBUTED ADJUSTMENT                                           ..............           2,510           9,140          +9,140          +6,630
                                                                       ---------------------------------------------------------------------------------
           TOTAL, RESERVE PERSONNEL, AIR FORCE                               1,741,365       1,743,875       1,728,505         -12,860         -15,370
--------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                            2013 budget      Committee      Change from
 Line         Item           estimate     recommendation  budget request
------------------------------------------------------------------------
       BA 1: UNIT AND
        INDIVIDUAL
        TRAINING

    90 Administration          372,149         350,149         -22,000
        and Support
           Full-Time    ..............  ..............         -14,000
            Pay and
            Allowances
            -Lower
            than
            Budgeted
            Strength
            Levels
           Reserve      ..............  ..............          -8,000
            Incentive
            Program--E
            xcess to
            Requiremen
            t

       UNDISTRIBUTED
        ADJUSTMENT
           Retain Air   ..............          15,100         +15,100
            Force
            Reserve
            Force
            Structure
           Unobligated  ..............          -5,960          -5,960
            Balances
------------------------------------------------------------------------

                     National Guard Personnel, Army

Appropriations, 2012....................................  $7,585,645,000
Budget estimate, 2013...................................   8,103,207,000
House allowance.........................................   8,089,477,000
Committee recommendation................................   8,005,077,000

    The Committee recommends an appropriation of 
$8,005,077,000. This is $98,130,000 below the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                [In thousands of dollars]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2013 budget        House         Committee   -------------------------------
                                         Item                                estimate        allowance    recommendation      Budget           House
                                                                                                                             estimate        allowance
--------------------------------------------------------------------------------------------------------------------------------------------------------

                       NATIONAL GUARD PERSONNEL, ARMY

     ACTIVITY 1: RESERVE COMPONENT TRAINING AND SUPPORT
     PAY GROUP A TRAINING (15 DAYS AND DRILLS 24/48)                         2,446,262       2,485,762       2,446,262  ..............         -39,500
     PAY GROUP F TRAINING (RECRUITS)                                           623,345         623,345         623,345  ..............  ..............
     PAY GROUP P TRAINING (PIPELINE RECRUITS)                                   29,528          29,528          24,128          -5,400          -5,400
     SCHOOL TRAINING                                                           500,423         500,423         500,423  ..............  ..............
     SPECIAL TRAINING                                                          536,856         536,856         536,856  ..............  ..............
     ADMINISTRATION AND SUPPORT                                              3,855,110       3,815,610       3,792,110         -63,000         -23,500
     EDUCATION BENEFITS                                                        111,683         111,683          95,683         -16,000         -16,000
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 1                                          8,103,207       8,103,207       8,018,807         -84,400         -84,400

     UNDISTRIBUTED ADJUSTMENT                                           ..............         -13,730         -13,730         -13,730  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, NATIONAL GUARD PERSONNEL, ARMY                             8,103,207       8,089,477       8,005,077         -98,130         -84,400
--------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                            2013 budget      Committee      Change from
 Line         Item           estimate     recommendation  budget request
------------------------------------------------------------------------
       BA1: UNIT AND
        INDIVIDUAL
        TRAINING

    40 Pay Group P              29,528          24,128          -5,400
        Training
        (Pipeline
        Recruits)
           Individual   ..............  ..............          -5,400
            Clothing
            and
            Uniform
            Allowance-
            -Excess to
            Requiremen
            t
    90 Administration        3,855,110       3,792,110         -63,000
        and Support
           Full-Time    ..............  ..............         -63,000
            Pay and
            Allowances
            -Army
            Guard
            Identified
            Excess to
            Requiremen
            t
   100 Education               111,683          95,683         -16,000
        Benefits
           Excess to    ..............  ..............         -16,000
            Requiremen
            t

       UNDISTRIBUTED
        ADJUSTMENT
           Unobligated  ..............         -13,730         -13,730
            Balances
------------------------------------------------------------------------

                  National Guard Personnel, Air Force

Appropriations, 2012....................................  $3,088,929,000
Budget estimate, 2013...................................   3,110,065,000
House allowance.........................................   3,158,015,000
Committee recommendation................................   3,161,765,000

    The Committee recommends an appropriation of 
$3,161,765,000. This is $51,700,000 above the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                [In thousands of dollars]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2013 budget        House         Committee   -------------------------------
                                         Item                                estimate        allowance    recommendation      Budget           House
                                                                                                                             estimate        allowance
--------------------------------------------------------------------------------------------------------------------------------------------------------

                    NATIONAL GUARD PERSONNEL, AIR FORCE

     ACTIVITY 1: RESERVE COMPONENT TRAINING AND SUPPORT
     PAY GROUP A TRAINING (15 DAYS AND DRILLS 24/48)                           910,733         910,733         885,733         -25,000         -25,000
     PAY GROUP F TRAINING (RECRUITS)                                           122,985         122,985         122,985  ..............  ..............
     PAY GROUP P TRAINING (PIPELINE RECRUITS)                                    4,811           4,811           4,811  ..............  ..............
     SCHOOL TRAINING                                                           245,857         245,857         245,857  ..............  ..............
     SPECIAL TRAINING                                                          142,591         142,591         142,591  ..............  ..............
     ADMINISTRATION AND SUPPORT                                              1,648,453       1,641,953       1,648,453  ..............          +6,500
     EDUCATION BENEFITS                                                         34,635          34,635          34,635  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 1                                          3,110,065       3,103,565       3,085,065         -25,000         -18,500

     UNDISTRIBUTED ADJUSTMENT                                           ..............          54,450          76,700         +76,700         +22,250
                                                                       ---------------------------------------------------------------------------------
           TOTAL, NATIONAL GUARD PERSONNEL, AIR FORCE                        3,110,065       3,158,015       3,161,765         +51,700          +3,750
--------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                 2013 budget       Committee       Change from
 Line                            Item                              estimate      recommendation   budget request
----------------------------------------------------------------------------------------------------------------
       BA 1: UNIT AND INDIVIDUAL TRAINING

    10 Pay Group A Training (15 Days & Drills 24/48)                 910,733          885,733          -25,000
           Active Duty for Training--Projected Under-        ...............  ...............          -17,000
            execution
           Inactive Duty Training--Projected Underexecution  ...............  ...............           -3,000
           Clothing Allowances--Excess to Requirement        ...............  ...............           -5,000

       UNDISTRIBUTED ADJUSTMENT
           Retain Air National Guard Force Structure         ...............           76,700          +76,700
----------------------------------------------------------------------------------------------------------------


                                TITLE II

                       OPERATION AND MAINTENANCE

    Funds appropriated under this title provide the resources 
required to prepare for and conduct combat operations and other 
peace time missions. These funds are used to purchase fuel and 
spare parts for training operations, pay supporting civilian 
personnel, and purchase supplies, equipment, and service 
contracts for the repair of weapons and facilities.
    The President's fiscal year 2013 budget requests a total of 
$174,938,933,000 for operation and maintenance appropriations.

                      SUMMARY OF COMMITTEE ACTION

    The Committee recommends operation and maintenance 
appropriations totaling $170,785,490,000 for fiscal year 2013. 
This is $4,153,443,000 below the budget estimate.
    Committee recommended operation and maintenance 
appropriations for fiscal year 2013 are summarized below:

                               SUMMARY OF OPERATION AND MAINTENANCE APPROPRIATIONS
                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                                                    Change from
                             Account                                2013 budget      Committee        budget
                                                                     estimate     recommendation     estimate
----------------------------------------------------------------------------------------------------------------
Operation and Maintenance:
    Operation and Maintenance, Army.............................      36,608,592      33,804,145      -2,804,447
    Operation and Maintenance, Navy.............................      41,606,943      40,479,556      -1,127,387
    Operation and Maintenance, Marine Corps.....................       5,983,163       5,894,963         -88,200
    Operation and Maintenance, Air Force........................      35,435,360      34,983,793        -451,567
    Operation and Maintenance, Defense-Wide.....................      31,993,013      31,331,839        -661,174
    Operation and Maintenance, Army Reserve.....................       3,162,008       3,140,508         -21,500
    Operation and Maintenance, Navy Reserve.....................       1,246,982       1,246,982  ..............
    Operation and Maintenance, Marine Corps Reserve.............         272,285         272,285  ..............
    Operation and Maintenance, Air Force Reserve................       3,166,482       3,227,382         +60,900
    Operation and Maintenance, Army National Guard..............       7,108,612       7,075,042         -33,570
    Operation and Maintenance, Air National Guard...............       6,015,455       6,493,155        +477,700
    United States Court of Appeals for the Armed Forces.........          13,516          13,516  ..............
    Environmental Restoration, Army.............................         335,921         335,921  ..............
    Environmental Restoration, Navy.............................         310,594         310,594  ..............
    Environmental Restoration, Air Force........................         529,263         529,263  ..............
    Environmental Restoration, Defense-Wide.....................          11,133          11,133  ..............
    Environmental Restoration, Formerly Used Defense Sites......         237,543         287,543         +50,000
    Overseas Humanitarian, Disaster and Civic Aid...............         108,759         108,759  ..............
    Cooperative Threat Reduction Account........................         519,111         519,111  ..............
    Department of Defense Acquisition Workforce Development Fund         274,198         720,000        +445,802
                                                                 -----------------------------------------------
      Total.....................................................     174,938,933     170,785,490      -4,153,443
----------------------------------------------------------------------------------------------------------------

                   OPERATION AND MAINTENANCE OVERVIEW

    Joint Strike Fighter [JSF] Sustainment Costs.--The fiscal 
year 2013 budget request includes $302,400,000 for operations 
and sustainment of up to 66 production aircraft. The Committee 
is concerned with the overall total ownership cost, noting that 
operations and sustainment generally ranges from 60-70 percent 
of a program's total cost. The Committee notes that in the 
December 2011 Selected Acquisition Report [SAR] the total JSF 
operations and sustainment cost increased over 10 percent from 
$1,113,200,000,000 to $1,221,100,000,000 as compared to the 
previous SAR. According to a March 2012 Government 
Accountability Office report, ``effectively managing software 
and the global supply chain is critical to improving program 
outcomes.'' In order to better understand the management of 
these critical areas, the Committee directs the Secretary of 
Defense to report to the congressional defense committees no 
later than 180 days after enactment of this act on the 
following: (1) a comprehensive review of sustaining the 
engineering workforce to include identifying efficiencies (such 
as creating a software engineering task force similar to the F/
A-18 program); (2) a comprehensive review of the supply chain 
management construct, to include identifying areas within 
supply chain management that are cost drivers; (3) a 
sustainment affordability model with cost objectives that drive 
costs downward; and (4) a list of the top five cost drivers and 
top five risk areas in operations and sustainment.

                    Operation and Maintenance, Army

Appropriations, 2012.................................... $31,072,902,000
Budget estimate, 2013...................................  36,608,592,000
House allowance.........................................  36,422,738,000
Committee recommendation................................  33,804,145,000

    The Committee recommends an appropriation of 
$33,804,145,000. This is $2,804,447,000 below the budget 
estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                [In thousands of dollars]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2013 budget        House         Committee   -------------------------------
                                         Item                                estimate        allowance    recommendation      Budget           House
                                                                                                                             estimate        allowance
--------------------------------------------------------------------------------------------------------------------------------------------------------
                      OPERATION AND MAINTENANCE, ARMY

     BUDGET ACTIVITY 1: OPERATING FORCES

     LAND FORCES
     MANEUVER UNITS                                                          1,223,087       1,055,242         857,517        -365,570        -197,725
     MODULAR SUPPORT BRIGADES                                                   80,574          67,902          80,574  ..............         +12,672
     ECHELONS ABOVE BRIGADES                                                   723,039         620,651         648,187         -74,852         +27,536
     THEATER LEVEL ASSETS                                                      706,974         620,666         688,889         -18,085         +68,223
     LAND FORCES OPERATIONS SUPPORT                                          1,226,650       1,086,855       1,084,853        -141,797          -2,002
     AVIATION ASSETS                                                         1,319,832       1,297,479       1,258,327         -61,505         -39,152

     LAND FORCES READINESS
     FORCE READINESS OPERATIONS SUPPORT                                      3,447,174       3,183,178       3,147,285        -299,889         -35,893
     LAND FORCES SYSTEMS READINESS                                             454,774         454,774         454,774  ..............  ..............
     LAND FORCES DEPOT MAINTENANCE                                           1,762,757       1,762,757         628,155      -1,134,602      -1,134,602

     LAND FORCES READINESS SUPPORT
     BASE OPERATIONS SUPPORT                                                 7,401,613       7,924,423       7,034,366        -367,247        -890,057
     FACILITIES SUSTAINMENT, RESTORATION, & MODERNIZATION                    3,041,074       3,295,481       3,041,074  ..............        -254,407
     MANAGEMENT AND OPERATIONAL HEADQUARTERS                                   410,171         410,171         410,171  ..............  ..............
     COMBATANT COMMANDER'S CORE OPERATIONS                                     177,819         177,819         177,819  ..............  ..............
     COMBATANT COMMANDERS ANCILLARY MISSIONS                                   461,333         461,333         461,333  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 1                                         22,436,871      22,418,731      19,973,324      -2,463,547      -2,445,407

     BUDGET ACTIVITY 2: MOBILIZATION

     MOBILITY OPERATIONS
     STRATEGIC MOBILITY                                                        405,496         405,496         405,496  ..............  ..............
     ARMY PREPOSITIONED STOCKS                                                 195,349         195,349         195,349  ..............  ..............
     INDUSTRIAL PREPAREDNESS                                                     6,379           6,379           6,379  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 2                                            607,224         607,224         607,224  ..............  ..............

     BUDGET ACTIVITY 3: TRAINING AND RECRUITING

     ACCESSION TRAINING
     OFFICER ACQUISITION                                                       112,866         112,866         112,866  ..............  ..............
     RECRUIT TRAINING                                                           73,265          73,265          73,265  ..............  ..............
     ONE STATION UNIT TRAINING                                                  51,227          51,227          51,227  ..............  ..............
     SENIOR RESERVE OFFICERS TRAINING CORPS                                    443,306         481,306         443,306  ..............         -38,000

     BASIC SKILL AND ADVANCED TRAINING
     SPECIALIZED SKILL TRAINING                                              1,099,556       1,099,556       1,079,556         -20,000         -20,000
     FLIGHT TRAINING                                                         1,130,627       1,130,627       1,130,627  ..............  ..............
     PROFESSIONAL DEVELOPMENT EDUCATION                                        191,683         191,683         191,683  ..............  ..............
     TRAINING SUPPORT                                                          652,095         652,095         652,095  ..............  ..............

     RECRUITING AND OTHER TRAINING AND EDUCATION
     RECRUITING AND ADVERTISING                                                507,510         507,510         507,510  ..............  ..............
     EXAMINING                                                                 156,964         156,964         156,964  ..............  ..............
     OFF-DUTY AND VOLUNTARY EDUCATION                                          244,343         244,343         244,343  ..............  ..............
     CIVILIAN EDUCATION AND TRAINING                                           212,477         212,477         203,477          -9,000          -9,000
     JUNIOR RESERVE OFFICERS TRAINING CORPS                                    182,691         182,691         182,691  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 3                                          5,058,610       5,096,610       5,029,610         -29,000         -67,000

     BUDGET ACTIVITY 4: ADMIN & SERVICEWIDE ACTIVITIES

     LOGISTICS OPERATIONS
     SERVICEWIDE TRANSPORTATION                                                601,331         601,331         601,331  ..............  ..............
     CENTRAL SUPPLY ACTIVITIES                                                 741,324         741,324         741,324  ..............  ..............
     LOGISTICS SUPPORT ACTIVITIES                                              610,136         610,136         610,136  ..............  ..............
     AMMUNITION MANAGEMENT                                                     478,707         478,707         478,707  ..............  ..............

     SERVICEWIDE SUPPORT
     ADMINISTRATION                                                            556,307         556,307         556,307  ..............  ..............
     SERVICEWIDE COMMUNICATIONS                                              1,547,925       1,495,880       1,542,925          -5,000         +47,045
     MANPOWER MANAGEMENT                                                       362,205         313,953         338,205         -24,000         +24,252
     OTHER PERSONNEL SUPPORT                                                   220,754         220,754         220,754  ..............  ..............
     OTHER SERVICE SUPPORT                                                   1,153,556       1,158,456       1,148,656          -4,900          -9,800
     ARMY CLAIMS ACTIVITIES                                                    250,970         240,970         250,970  ..............         +10,000
     REAL ESTATE MANAGEMENT                                                    222,351         222,351         211,351         -11,000         -11,000
     BASE OPERATIONS SUPPORT                                                   222,379         222,379         222,379  ..............  ..............

     SUPPORT OF OTHER NATIONS
     SUPPORT OF NATO OPERATIONS                                                459,710         459,393         459,710  ..............            +317
     MISC. SUPPORT OF OTHER NATIONS                                             25,637          25,637          25,637  ..............  ..............

     OTHER PROGRAMS
     OTHER PROGRAMS                                                          1,052,595       1,052,595       1,062,195          +9,600          +9,600
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 4                                          8,505,887       8,400,173       8,470,587         -35,300         +70,414

     INVENTORY OF SPARE PARTS AND SECONDARY ITEMS                       ..............        -100,000  ..............  ..............        +100,000
     CIVILIAN PERSONNEL COMPENSATION                                    ..............  ..............         -34,000         -34,000         -34,000
     EXCESS WORKING CAPITAL FUND CARRYOVER                              ..............  ..............        -146,600        -146,600        -146,600
     TRANSFER TO OPERATION AND MAINTENANCE, NAVY                        ..............  ..............         -27,000         -27,000         -27,000
     TRANSFER TO RESEARCH, DEVELOPMENT, TEST AND EVALUATION ARMY        ..............  ..............         -22,000         -22,000         -22,000
     IT CONTRACT SUPPORT GROWTH                                         ..............  ..............         -47,000         -47,000         -47,000
                                                                       =================================================================================
           TOTAL, OPERATION AND MAINTENANCE, ARMY                           36,608,592      36,422,738      33,804,145      -2,804,447      -2,618,593
--------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
   111 MANEUVER UNITS        1,223,087         857,517        -365,570
           Transfer to  ..............  ..............        -217,376
            Title IX:
            Combined
            Arms
            Training
            Strategy
           Transfer to  ..............  ..............        -148,194
            Title IX:
            Theater
            Demand
            Reduction
   113 ECHELONS ABOVE          723,039         648,187         -74,852
        BRIGADE
           Transfer to  ..............  ..............         -74,852
            Title IX:
            Combined
            Arms
            Training
            Strategy
   114 THEATER LEVEL           706,974         688,889         -18,085
        ASSETS
           Army-        ..............  ..............         -18,085
            Identified
            Excess for
            Balkans
            Mission
            Contract
            Support
   115 LAND FORCES           1,226,650       1,084,853        -141,797
        OPERATIONS
        SUPPORT
           Transfer to  ..............  ..............        -141,797
            Title IX:
            Combat
            Training
            Centers
   116 AVIATION ASSETS       1,319,832       1,258,327         -61,505
           Transfer to  ..............  ..............         -61,505
            Title IX:
            Theater
            Demand
            Reduction
   121 FORCE READINESS       3,447,174       3,147,285        -299,889
        OPERATIONS
        SUPPORT
           Transfer to  ..............  ..............         -71,660
            Title IX:
            Body Armor
            Sustainmen
            t
           Transfer to  ..............  ..............        -228,229
            Title IX:
            Forward
            Operating
            Base--Kuwa
            it
   123 LAND FORCES           1,762,757         628,155      -1,134,602
        DEPOT
        MAINTENANCE
           Transfer to  ..............  ..............        -150,483
            Title IX:
            Depot
            Maintenanc
            e--Aviatio
            n
           Transfer to  ..............  ..............        -203,560
            Title IX:
            Depot
            Maintenanc
            e--Communi
            cations
            Electronic
            s
           Transfer to  ..............  ..............        -102,707
            Title IX:
            Depot
            Maintenanc
            e--General
            Purpose
           Transfer to  ..............  ..............        -161,174
            Title IX:
            Depot
            Maintenanc
            e--Missile
            s
           Transfer to  ..............  ..............        -516,678
            Title IX:
            Depot
            Maintenanc
            e--Post
            Production
            Software
            Support
            [PPSS]
   131 BASE OPERATIONS       7,401,613       7,034,366        -367,247
        SUPPORT
           Removal of   ..............  ..............        -101,247
            One-Time
            Fiscal
            Year 2012
            Costs for
            Base
            Operations
            Programs
           Army-        ..............  ..............         -52,000
            Requested
            Transfer
            to Other
            Procuremen
            t, Army
            Line 61A:
            Emergency
            Management
            Modernizat
            ion
            Program
           Budget       ..............  ..............         -29,000
            Justificat
            ion Does
            Not Match
            Summary of
            Price and
            Program
            Changes
            for the
            Building
            Maintenanc
            e Fund
           Environment  ..............  ..............         +15,000
            al
            Conservati
            on for
            Ranges to
            Address
            Shortfalls
           Transfer to  ..............  ..............        -200,000
            Title IX:
            Overseas
            Security
            Guards
   321 SPECIALIZED           1,099,556       1,079,556         -20,000
        SKILL TRAINING
           Program      ..............  ..............         -20,000
            Decreases
            for TRADOC
            Centers of
            Excellence
            and Joint
            Service
            Schools
            Not
            Properly
            Accounted
            for in
            Budget
            Justificat
            ion
   331 RECRUITING AND          507,510         507,510  ..............
        ADVERTISING
           Active Army  ..............  ..............          -2,300
            NASCAR
            Sponsorshi
            p Costs
            Eliminated
            for Fiscal
            Year 2013
           Transfer     ..............  ..............          +2,300
            Funds to
            Increase
            Online
            Presence
            for
            Recruiting
            and
            Advertisin
            g Efforts
   334 CIVILIAN                212,477         203,477          -9,000
        EDUCATION AND
        TRAINING
           Training     ..............  ..............          -9,000
            Load
            Decreases
            Not
            Properly
            Accounted
            for in
            Budget
            Justificat
            ion
   411 SECURITY              1,052,595       1,062,195          +9,600
        PROGRAMS
           Classified   ..............  ..............          +9,600
            Adjustment
   432 SERVICEWIDE           1,547,925       1,542,925          -5,000
        COMMUNICATIONS
           Duplicate    ..............  ..............          -5,000
            Request
            for
            Pricing
            Adjustment
            for
            Defense
            Informatio
            n Systems
            Agency
            [DISA]
   433 MANPOWER                362,205         338,205         -24,000
        MANAGEMENT
           Army-        ..............  ..............         -24,000
            Identified
            Excess for
            Civilian
            Personnel
            Resources
            Support
   435 OTHER SERVICE         1,153,556       1,148,656          -4,900
        SUPPORT
           Removal of   ..............  ..............          -4,900
            One-Time
            Fiscal
            Year 2012
            Increase
   437 REAL ESTATE             222,351         211,351         -11,000
        MANAGEMENT
           Budget       ..............  ..............         -11,000
            Justificat
            ion Does
            Not Match
            Summary of
            Price and
            Program
            Changes
            for the
            Pentagon
            Reservatio
            n
            Maintenanc
            e
            Revolving
            Fund
UNDIST Army-Identified  ..............  ..............         -34,000
        Excess for
        Civilian
        Personnel
        Compensa- tion
UNDIST Excess Working   ..............  ..............        -146,600
        Capital Fund
        Carry Over
UNDIST Transfer to      ..............  ..............         -27,000
        Operation and
        Maintenance,
        Navy for Joint
        High Speed
        Vessel Costs
        Not Properly
        Accounted for
        in Budget
        Justification
UNDIST Transfers to     ..............  ..............         -22,000
        Research,
        Development,
        Test and
        Evaluation,
        Army Not
        Properly
        Accounted for
        in Budget
        Justification
UNDIST Budget           ..............  ..............         -47,000
        Justification
        Does Not Match
        Summary of
        Price and
        Program
        Changes for IT
        Contract
        Support Growth
------------------------------------------------------------------------

    Arlington National Cemetery.--The budget request proposes 
to fund Arlington National Cemetery through three separate 
accounts contained in two different appropriations bills for 
fiscal year 2013. Although the Committee does not support this 
approach, the efforts to correct issues at Arlington National 
Cemetery are of utmost importance. Therefore, the Committee 
provides authority to spend up to $25,000,000 from within the 
funds appropriated for Operation and Maintenance, Army. This 
authority is provided for fiscal year 2013 only. The Committee 
will not support future requests for Arlington National 
Cemetery in the Defense appropriations bill and directs that 
future funding requests be contained in the Department of 
Defense, Cemeterial Expenses, Army account, which is funded in 
the Military Construction, Veterans Affairs, and Related 
Agencies appropriations bill.
    Fire-Resistant Equipment.--The Committee remains concerned 
that deployed forces face excessive risk of burns from exposure 
to improvised explosive devices and other threats. While the 
Committee commends the Army for providing its vehicle crews 
with a comprehensive fire-resistant clothing ensemble, the 
Committee believes that proven fire-resistant protection for 
extremities, particularly protection for soldiers' feet in the 
form of durable, comfortable, and fire-resistant boot socks, 
should be provided to every soldier, including dismounted 
soldiers. The Committee encourages the Army to consider 
expanding its requirement for fire-resistant boot socks from 
only mounted soldiers to include dismounted soldiers as well.

                    Operation and Maintenance, Navy

Appropriations, 2012.................................... $38,120,821,000
Budget estimate, 2013...................................  41,606,943,000
House allowance.........................................  41,463,773,000
Committee recommendation................................  40,479,556,000

    The Committee recommends an appropriation of 
$40,479,556,000. This is $1,127,387,000 below the budget 
estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                [In thousands of dollars]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2013 budget        House         Committee   -------------------------------
                                         Item                                estimate        allowance    recommendation      Budget           House
                                                                                                                             estimate        allowance
--------------------------------------------------------------------------------------------------------------------------------------------------------
                      OPERATION AND MAINTENANCE, NAVY

     BUDGET ACTIVITY 1: OPERATING FORCES

     AIR OPERATIONS
     MISSION AND OTHER FLIGHT OPERATIONS                                     4,918,144       4,927,144       4,737,199        -180,945        -189,945
     FLEET AIR TRAINING                                                      1,886,825       1,886,825       1,847,825         -39,000         -39,000
     AVIATION TECHNICAL DATA AND ENGINEERING SERVICES                           44,032          44,032          44,032  ..............  ..............
     AIR OPERATIONS AND SAFETY SUPPORT                                         101,565         101,565         101,565  ..............  ..............
     AIR SYSTEMS SUPPORT                                                       374,827         374,827         374,827  ..............  ..............
     AIRCRAFT DEPOT MAINTENANCE                                                960,802         960,802         960,802  ..............  ..............
     AIRCRAFT DEPOT OPERATIONS SUPPORT                                          37,545          37,545          37,545  ..............  ..............
     AVIATION LOGISTICS                                                        328,805         328,805         328,805  ..............  ..............

     SHIP OPERATIONS
     MISSION AND OTHER SHIP OPERATIONS                                       4,686,535       4,711,235       4,181,715        -504,820        -529,520
     SHIP OPERATIONS SUPPORT AND TRAINING                                      769,204         769,204         769,204  ..............  ..............
     SHIP DEPOT MAINTENANCE                                                  5,089,981       5,157,981       5,239,981        +150,000         +82,000
     SHIP DEPOT OPERATIONS SUPPORT                                           1,315,366       1,318,385       1,315,366  ..............          -3,019

     COMBAT COMMUNICATIONS/SUPPORT
     COMBAT COMMUNICATIONS                                                     619,909         619,909         619,909  ..............  ..............
     ELECTRONIC WARFARE                                                         92,364          92,364          92,364  ..............  ..............
     SPACE SYSTEMS AND SURVEILLANCE                                            174,437         174,437         174,437  ..............  ..............
     WARFARE TACTICS                                                           441,035         441,035         441,035  ..............  ..............
     OPERATIONAL METEOROLOGY AND OCEANOGRAPHY                                  333,554         333,554         333,554  ..............  ..............
     COMBAT SUPPORT FORCES                                                     910,087         910,087         717,286        -192,801        -192,801
     EQUIPMENT MAINTENANCE                                                     167,158         167,158         167,158  ..............  ..............
     DEPOT OPERATIONS SUPPORT                                                    4,183           4,183           4,183  ..............  ..............
     COMBATANT COMMANDERS CORE OPERATIONS                                       95,528          95,528          95,528  ..............  ..............
     COMBATANT COMMANDERS DIRECT MISSION SUPPORT                               204,569         204,569         204,569  ..............  ..............

     WEAPONS SUPPORT
     CRUISE MISSILE                                                            111,884         111,884         111,884  ..............  ..............
     FLEET BALLISTIC MISSILE                                                 1,181,038       1,181,038       1,181,038  ..............  ..............
     IN-SERVICE WEAPONS SYSTEMS SUPPORT                                         87,606          87,606          87,606  ..............  ..............
     WEAPONS MAINTENANCE                                                       519,583         539,583         519,583  ..............         -20,000
     OTHER WEAPON SYSTEMS SUPPORT                                              300,435         300,435         300,435  ..............  ..............

     BASE SUPPORT
     ENTERPRISE INFORMATION TECHNOLOGY                                       1,077,924       1,077,924       1,069,924          -8,000          -8,000
     FACILITIES SUSTAINMENT, RESTORATION & MODERNIZATION                     2,101,279       2,311,407       2,082,106         -19,173        -229,301
     BASE OPERATING SUPPORT                                                  4,822,093       4,822,093       4,656,818        -165,275        -165,275
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 1                                         33,758,297      34,093,144      32,798,283        -960,014      -1,294,861

     BUDGET ACTIVITY 2: MOBILIZATION

     READY RESERVE AND PREPOSITIONING FORCES
     SHIP PREPOSITIONING AND SURGE                                             334,659         334,659         334,659  ..............  ..............

     ACTIVATIONS/INACTIVATIONS
     AIRCRAFT ACTIVATIONS/INACTIVATIONS                                          6,562           6,562           6,562  ..............  ..............
     SHIP ACTIVATIONS/INACTIVATIONS                                          1,066,329         587,329       1,053,783         -12,546        +466,454

     MOBILIZATION PREPAREDNESS
     FLEET HOSPITAL PROGRAM                                                     83,901          83,901          80,413          -3,488          -3,488
     INDUSTRIAL READINESS                                                        2,695           2,695           2,695  ..............  ..............
     COAST GUARD SUPPORT                                                        23,502          23,502          23,502  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 2                                          1,517,648       1,038,648       1,501,614         -16,034        +462,966

     BUDGET ACTIVITY 3: TRAINING AND RECRUITING

     ACCESSION TRAINING
     OFFICER ACQUISITION                                                       147,807         147,807         147,807  ..............  ..............
     RECRUIT TRAINING                                                           10,473          10,473          10,473  ..............  ..............
     RESERVE OFFICERS TRAINING CORPS                                           139,220         139,220         139,220  ..............  ..............

     BASIC SKILLS AND ADVANCED TRAINING
     SPECIALIZED SKILL TRAINING                                                582,177         582,177         582,177  ..............  ..............
     FLIGHT TRAINING                                                             5,456           5,456           5,456  ..............  ..............
     PROFESSIONAL DEVELOPMENT EDUCATION                                        170,746         170,746         170,746  ..............  ..............
     TRAINING SUPPORT                                                          153,403         153,403         153,403  ..............  ..............

     RECRUITING, AND OTHER TRAINING AND EDUCATION
     RECRUITING AND ADVERTISING                                                241,329         242,312         242,366          +1,037             +54
     OFF-DUTY AND VOLUNTARY EDUCATION                                          108,226         108,226         108,226  ..............  ..............
     CIVILIAN EDUCATION AND TRAINING                                           105,776         105,776         105,776  ..............  ..............
     JUNIOR ROTC                                                                51,817          51,817          51,817  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 3                                          1,716,430       1,717,413       1,717,467          +1,037             +54

     BUDGET ACTIVITY 4: ADMIN & SERVICEWIDE ACTIVITIES

     SERVICEWIDE SUPPORT
     ADMINISTRATION                                                            797,177         797,177         797,177  ..............  ..............
     EXTERNAL RELATIONS                                                         12,872          12,872          12,872  ..............  ..............
     CIVILIAN MANPOWER AND PERSONNEL MANAGEMENT                                120,181         120,181         120,181  ..............  ..............
     MILITARY MANPOWER AND PERSONNEL MANAGEMENT                                235,753         235,753         207,242         -28,511         -28,511
     OTHER PERSONNEL SUPPORT                                                   263,060         263,060         263,060  ..............  ..............
     SERVICEWIDE COMMUNICATIONS                                                363,213         363,213         363,213  ..............  ..............

     LOGISTICS OPERATIONS AND TECHNICAL SUPPORT
     SERVICEWIDE TRANSPORTATION                                                182,343         182,343         182,343  ..............  ..............
     PLANNING, ENGINEERING AND DESIGN                                          282,464         282,464         282,464  ..............  ..............
     ACQUISITION AND PROGRAM MANAGEMENT                                      1,092,123       1,092,123       1,085,258          -6,865          -6,865
     HULL, MECHANICAL AND ELECTRICAL SUPPORT                                    53,560          53,560          53,560  ..............  ..............
     COMBAT/WEAPONS SYSTEMS                                                     25,299          25,299          25,299  ..............  ..............
     SPACE AND ELECTRONIC WARFARE SYSTEMS                                       64,418          64,418          64,418  ..............  ..............

     SECURITY PROGRAMS
     NAVAL INVESTIGATIVE SERVICE                                               580,042         580,042         580,042  ..............  ..............

     SUPPORT OF OTHER NATIONS
     INTERNATIONAL HEADQUARTERS AND AGENCIES                                     4,984           4,984           4,984  ..............  ..............

     OTHER PROGRAMS
     OTHER PROGRAMS                                                            537,079         537,079         540,979          +3,900          +3,900
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 4                                          4,614,568       4,614,568       4,583,092         -31,476         -31,476

     EXCESS WORKING CAPITAL FUND CARRYOVER                              ..............  ..............        -120,900        -120,900        -120,900
                                                                       =================================================================================
           TOTAL, OPERATION AND MAINTENANCE, NAVY                           41,606,943      41,463,773      40,479,556      -1,127,387        -984,217
--------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
  1A1A MISSION AND           4,918,144       4,737,199        -180,945
        OTHER FLIGHT
        OPERATIONS
           Transfer to  ..............  ..............        -180,945
            Title IX:
            Flying
            Hours
  1A2A FLEET AIR             1,886,825       1,847,825         -39,000
        TRAINING
           Decrease     ..............  ..............         -39,000
            for Marine
            Corps F/A-
            18 Flight
            Training
            Requiremen
            ts Not
            Properly
            Accounted
            For in
            Budget
            Justificat
            ion
  1B1B MISSION AND           4,686,535       4,181,715        -504,820
        OTHER SHIP
        OPERATIONS
           Transfer to  ..............  ..............        -504,820
            Title IX:
            Ship
            Consumable
            s, Repair
            Parts,
            Fuel,
            Administra
            tion
  1B4B SHIP DEPOT            5,089,981       5,239,981        +150,000
        MAINTENANCE
           Navy-        ..............  ..............        +150,000
            Identified
            Shortfall
            to Repair
            USS MIAMI
  1C6C COMBAT SUPPORT          910,087         717,286        -192,801
        FORCES
           Transfer to  ..............  ..............        -192,801
            Title IX:
            Naval
            Expedition
            ary Combat
            Command
            Increases
  BSIT ENTERPRISE            1,077,924       1,069,924          -8,000
        INFORMATION
           Reduced      ..............  ..............          -8,000
            Requiremen
            t for
            OCONUS
            Navy
            Enterprise
            Network
            (ONE-Net)
            Not
            Properly
            Accounted
            for in
            Budget
            Justificat
            ion
  BSM1 SUSTAINMENT,          2,101,279       2,082,106         -19,173
        RESTORATION,
        AND
        MODERNIZATION
           Transfer to  ..............  ..............         -19,173
            Title IX:
            Camp
            Lemonnier,
            Djibouti
  BSS1 BASE OPERATING        4,822,093       4,656,818        -165,275
        SUPPORT
           Unjustified  ..............  ..............          -7,000
            Growth for
            Costs at
            Guantanamo
            Bay
           Environment  ..............  ..............         +15,000
            al
            Conservati
            on for
            Ranges to
            Address
            Shortfalls
           Transfer to  ..............  ..............        -173,275
            Title IX:
            Camp
            Lemonnier,
            Djibouti
  2B2G SHIP                  1,066,329       1,053,783         -12,546
        ACTIVATIONS/
        INACTIVATIONS
           Retain Four  ..............  ..............         -12,546
            Cruisers
  2C1H FLEET HOSPITAL           83,901          80,413          -3,488
        PROGRAM
           Transfer to  ..............  ..............          -3,488
            Title IX:
            Camp
            Lemonnier,
            Djibouti
  3C1L RECRUITING AND          241,329         242,366          +1,037
        ADVERTISING
           Naval Sea    ..............  ..............          +1,037
            Cadet
            Corps
  4A4M MILITARY                235,753         207,242         -28,511
        MANPOWER AND
        PERSONNEL
        MANAGEMENT
           Transfer to  ..............  ..............         -28,511
            Title IX:
            Camp
            Lemonnier,
            Djibouti
  4B3N ACQUISITION AND       1,092,123       1,085,258          -6,865
        PROGRAM
        MANAGEMENT
           Transfer to  ..............  ..............          -6,865
            Title IX:
            Camp
            Lemonnier,
            Djibouti
       OTHER PROGRAMS          537,079         540,979          +3,900
           Classified   ..............  ..............          +3,900
            Adjustment
UNDIST Excess Working   ..............  ..............        -120,900
        Capital Fund
        Carry Over
------------------------------------------------------------------------

    USS Miami.--Subsequent to the fiscal year 2013 budget 
submission, the USS Miami experienced fire damage during a 
regularly scheduled maintenance availability. The Committee 
recommends an additional $150,000,000 only for repairs to the 
USS Miami and directs that none of those funds may be obligated 
or expended until 30 days after the Secretary of the Navy 
provides to the congressional defense committees an updated 
damage assessment, the Navy's proposed plan for the USS Miami 
and an updated cost estimate.
    Naval Shipyard Apprentice Program.--The Committee directs 
that during fiscal year 2013 the Navy shall induct classes of 
no fewer than 100 apprentices, respectively, at each of the 
naval shipyards. The Committee further directs the Navy to 
include the costs of the fiscal year 2014 class of apprentices 
in its budget request.
    U.S. Coast Guard.--The Committee is aware that Department 
of Defense [DOD] regulations currently restrict DOD mission 
appropriated funded activities from offering reimbursable rates 
to non-DOD agencies. This restriction forces the Navy to charge 
the U.S. Coast Guard fully burdened rates for drydocking 
services at Navy shipyards rather than reimbursable rates. 
Therefore, the Committee directs that funds appropriated under 
Operation and Maintenance, Navy may be used to pay overhead 
costs incurred by a Naval Shipyard when drydocking U.S. Coast 
Guard ships.
    Defense Support to Civil Authorities.--Navy Emergency 
Preparedness Liaison Officers [NEPLOs] serve as senior Navy 
representatives for Defense Support to Civil Authorities during 
emergencies and events of national significance such as 
hurricanes, forest fires, flooding, and earthquakes. These 
officers depend heavily on an ability to communicate rapidly 
with service and interagency partners and to maintain an 
accurate common operating picture that facilitates response 
efforts. The Committee encourages the Department of Defense to 
consider improvements to readiness management, information 
sharing, communications, and situational awareness tools and 
technologies in support of NEPLO and similar programs that 
provide Defense Support to Civil Authorities during emergencies 
and events of national significance.
    Tank Corrosion Monitoring System.--The Committee encourages 
the Navy to pursue maintenance cost savings by expanding its 
camera and automated corrosion detection technology acquisition 
program from the LPD-17 and DDG-1000 class of ships to include 
the LSD-41, LSD-49, and LHD-1 class of ships.

                Operation and Maintenance, Marine Corps

Appropriations, 2012....................................  $5,542,937,000
Budget estimate, 2013...................................   5,983,163,000
House allowance.........................................   6,075,667,000
Committee recommendation................................   5,894,963,000

    The Committee recommends an appropriation of 
$5,894,963,000. This is $88,200,000 below the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                [In thousands of dollars]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2013 budget        House         Committee   -------------------------------
                                         Item                                estimate        allowance    recommendation      Budget           House
                                                                                                                             estimate        allowance
--------------------------------------------------------------------------------------------------------------------------------------------------------
                  OPERATION AND MAINTENANCE, MARINE CORPS

     BUDGET ACTIVITY 1: OPERATING FORCES

     EXPEDITIONARY FORCES
     OPERATIONAL FORCES                                                        788,055         788,055         842,455         +54,400         +54,400
     FIELD LOGISTICS                                                           762,614         762,614         762,614  ..............  ..............
     DEPOT MAINTENANCE                                                         168,447         168,447          56,447        -112,000        -112,000

     USMC PREPOSITIONING
     MARITIME PREPOSITIONING                                                   100,374         100,374         100,374  ..............  ..............
     FACILITIES SUSTAINMENT, RESTORATION & MODERNIZATION                       825,039         907,543         825,039  ..............         -82,504
     BASE OPERATING SUPPORT                                                  2,188,883       2,188,883       2,190,083          +1,200          +1,200
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 1                                          4,833,412       4,915,916       4,777,012         -56,400        -138,904

     BUDGET ACTIVITY 3: TRAINING AND RECRUITING

     ACCESSION TRAINING
     RECRUIT TRAINING                                                           18,251          18,251          18,251  ..............  ..............
     OFFICER ACQUISITION                                                           869             869             869  ..............  ..............

     BASIC SKILLS AND ADVANCED TRAINING
     SPECIALIZED SKILLS TRAINING                                                80,914          80,914          80,914  ..............  ..............
     PROFESSIONAL DEVELOPMENT EDUCATION                                         42,744          42,744          42,744  ..............  ..............
     TRAINING SUPPORT                                                          292,150         292,150         292,150  ..............  ..............

     RECRUITING AND OTHER TRAINING EDUCATION
     RECRUITING AND ADVERTISING                                                168,609         178,609         178,609         +10,000  ..............
     OFF-DUTY AND VOLUNTARY EDUCATION                                           56,865          56,865          56,865  ..............  ..............
     JUNIOR ROTC                                                                19,912          19,912          19,912  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 3                                            680,314         690,314         690,314         +10,000  ..............

     BUDGET ACTIVITY 4: ADMIN & SERVICEWIDE ACTIVITIES

     SERVICEWIDE SUPPORT
     SERVICEWIDE TRANSPORTATION                                                 39,962          39,962          39,962  ..............  ..............
     ACQUISITION AND PROGRAM MANAGEMENT                                         83,404          83,404          83,404  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 4                                            123,366         123,366         123,366  ..............  ..............

     OTHER PROGRAMS
     OTHER PROGRAMS                                                            346,071         346,071         341,071          -5,000          -5,000
     CIVILIAN PERSONNEL COMPENSATION                                    ..............  ..............         -30,000         -30,000         -30,000
     EXCESS WORKING CAPITAL FUND CARRYOVER                              ..............  ..............          -6,800          -6,800          -6,800
                                                                       =================================================================================
           TOTAL, OPERATION AND MAINTENANCE, MARINE CORPS                    5,983,163       6,075,667       5,894,963         -88,200        -180,704
--------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
  1A1A OPERATIONAL             788,055         842,455         +54,400
        FORCES
           Civilian     ..............  ..............         -10,600
            Personnel
            Realignmen
            t
            Requested
            as Program
            Growth
           Marine       ..............  ..............         +65,000
            Corps--Ide
            ntified
            Shortfall
            for Unit
            Deployment
            Program
  1A3A DEPOT                   168,447          56,447        -112,000
        MAINTENANCE
           Transfer to  ..............  ..............        -112,000
            Title IX:
            Depot
            Maintenanc
            e
  BSS1 BASE OPERATING        2,188,883       2,190,083          +1,200
        SUPPORT
           Budget       ..............  ..............         -13,800
            Justificat
            ion Does
            Not Match
            Summary of
            Price and
            Program
            Changes
            for Rents
           Environment  ..............  ..............         +15,000
            al
            Conservati
            on for
            Ranges to
            Address
            Shortfalls
  3C1F RECRUITING AND          168,609         178,609         +10,000
        ADVERTISING
           Marine       ..............  ..............         +10,000
            Corps--Req
            uested
            Transfer
            from
            Procuremen
            t, Marine
            Corps Line
            2 for
            Advertisin
            g Expenses
  9999 OTHER PROGRAMS          346,071         341,071          -5,000
           Removal of   ..............  ..............          -5,000
            One-Time
            Fiscal
            Year 2012
            Costs for
            Technical
            Services
            Organizati
            on
            Relocation
            Incentive
UNDIST Unjustified      ..............  ..............         -30,000
        Growth in
        Civilian
        Personnel
        Compensation
UNDIST Excess Working   ..............  ..............          -6,800
        Capital Fund
        Carry Over
------------------------------------------------------------------------

                  Operation and Maintenance, Air Force

Appropriations, 2012.................................... $34,985,486,000
Budget estimate, 2013...................................  35,435,360,000
House allowance.........................................  35,384,795,000
Committee recommendation................................  34,983,793,000

    The Committee recommends an appropriation of 
$34,983,793,000. This is $451,567,000 below the budget 
estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                [In thousands of dollars]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2013 budget        House         Committee   -------------------------------
                                         Item                                estimate        allowance    recommendation      Budget           House
                                                                                                                             estimate        allowance
--------------------------------------------------------------------------------------------------------------------------------------------------------
                    OPERATION AND MAINTENANCE, AIR FORCE

     BUDGET ACTIVITY 1: OPERATING FORCES

     AIR OPERATIONS
     PRIMARY COMBAT FORCES                                                   2,973,141       2,963,141       2,903,141         -70,000         -60,000
     COMBAT ENHANCEMENT FORCES                                               1,611,032       1,743,513       1,611,032  ..............        -132,481
     AIR OPERATIONS TRAINING                                                 1,472,806       1,422,806       1,404,526         -68,280         -18,280
     DEPOT MAINTENANCE                                                       5,545,470       5,545,470       5,537,470          -8,000          -8,000
     FACILITIES SUSTAINMENT, RESTORATION & MODERNIZATION                     1,353,987       1,489,386       1,353,987  ..............        -135,399
     BASE OPERATING SUPPORT                                                  2,595,032       2,534,984       2,597,532          +2,500         +62,548

     COMBAT RELATED OPERATIONS
     GLOBAL C3I AND EARLY WARNING                                              957,040         957,040         982,753         +25,713         +25,713
     OTHER COMBAT OPERATIONS SUPPORT PROGRAMS                                  916,200         916,200         903,200         -13,000         -13,000
     TACTICAL INTELLIGENCE AND SPECIAL ACTIVITIES                              733,716         733,716         733,716  ..............  ..............

     SPACE OPERATIONS
     LAUNCH FACILITIES                                                         314,490         314,490         314,490  ..............  ..............
     SPACE CONTROL SYSTEMS                                                     488,762         488,762         463,762         -25,000         -25,000
     COMBATANT COMMANDERS DIRECT MISSION SUPPORT                               862,979         737,412         850,979         -12,000        +113,567
     COMBATANT COMMANDERS CORE OPERATIONS                                      222,429         163,962         222,429  ..............         +58,467
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 1                                         20,047,084      20,010,882      19,879,017        -168,067        -131,865

     BUDGET ACTIVITY 2: MOBILIZATION

     MOBILITY OPERATIONS
     AIRLIFT OPERATIONS                                                      1,785,379       1,985,379       1,785,379  ..............        -200,000
     MOBILIZATION PREPAREDNESS                                                 154,049         154,049         154,049  ..............  ..............
     DEPOT MAINTENANCE                                                       1,477,396       1,477,396       1,477,396  ..............  ..............
     FACILITIES SUSTAINMENT, RESTORATION & MODERNIZATION                       309,699         340,669         309,699  ..............         -30,970
     BASE SUPPORT                                                              707,574         707,574         707,574  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 2                                          4,434,097       4,665,067       4,434,097  ..............        -230,970

     BUDGET ACTIVITY 3: TRAINING AND RECRUITING

     ACCESSION TRAINING
     OFFICER ACQUISITION                                                       115,427         115,427         115,427  ..............  ..............
     RECRUIT TRAINING                                                           17,619          17,619          17,619  ..............  ..............
     RESERVE OFFICER TRAINING CORPS [ROTC]                                      92,949          92,949          92,949  ..............  ..............
     FACILITIES SUSTAINMENT, RESTORATION & MODERNIZATION                       336,433         370,076         336,433  ..............         -33,643
     BASE SUPPORT (ACADEMIES ONLY)                                             842,441         793,441         842,441  ..............         +49,000

     BASIC SKILLS AND ADVANCED TRAINING
     SPECIALIZED SKILL TRAINING                                                482,634         482,634         482,634  ..............  ..............
     FLIGHT TRAINING                                                           750,609         750,609         750,609  ..............  ..............
     PROFESSIONAL DEVELOPMENT EDUCATION                                        235,114         235,114         235,114  ..............  ..............
     TRAINING SUPPORT                                                          101,231         101,231         101,231  ..............  ..............
     DEPOT MAINTENANCE                                                         233,330         233,330         233,330  ..............  ..............

     RECRUITING, AND OTHER TRAINING AND EDUCATION
     RECRUITING AND ADVERTISING                                                130,217         130,217         130,217  ..............  ..............
     EXAMINING                                                                   2,738           2,738           2,738  ..............  ..............
     OFF DUTY AND VOLUNTARY EDUCATION                                          155,170         155,170         155,170  ..............  ..............
     CIVILIAN EDUCATION AND TRAINING                                           175,147         175,147         175,147  ..............  ..............
     JUNIOR ROTC                                                                74,809          74,809          74,809  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 3                                          3,745,868       3,730,511       3,745,868  ..............         +15,357

     BUDGET ACTIVITY 4: ADMIN & SERVICEWIDE ACTIVITIES

     LOGISTICS OPERATIONS
     LOGISTICS OPERATIONS                                                    1,029,734       1,029,734       1,029,734  ..............  ..............
     TECHNICAL SUPPORT ACTIVITIES                                              913,843         913,843         913,843  ..............  ..............
     DEPOT MAINTENANCE                                                  ..............          29,163  ..............  ..............         -29,163
     FACILITIES SUSTAINMENT, RESTORATION & MODERNIZATION                       303,610         333,971         303,610  ..............         -30,361
     BASE SUPPORT                                                            1,266,800       1,266,800       1,266,800  ..............  ..............

     SERVICEWIDE ACTIVITIES
     ADMINISTRATION                                                            587,654         587,654         581,154          -6,500          -6,500
     SERVICEWIDE COMMUNICATIONS                                                667,910         667,910         667,910  ..............  ..............
     OTHER SERVICEWIDE ACTIVITIES                                            1,094,509       1,094,509       1,094,509  ..............  ..............
     CIVIL AIR PATROL CORPORATION                                               23,904          28,404          28,404          +4,500  ..............

     SUPPORT TO OTHER NATIONS
     INTERNATIONAL SUPPORT                                                      81,307          81,307          81,307  ..............  ..............

     OTHER PROGRAMS
     OTHER PROGRAMS                                                          1,239,040       1,239,040       1,239,040  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 4                                          7,208,311       7,272,335       7,206,311          -2,000         -66,024

     INVENTORY OF SPARE PARTS AND SECONDARY ITEMS                       ..............        -400,000  ..............  ..............        +400,000
     RETAIN AIR FORCE FORCE STRUCTURE                                   ..............         130,000          14,500         +14,500        -115,500
     CIVILIAN PERSONNEL COMPENSATION                                    ..............  ..............        -226,000        -226,000        -226,000
     FOREIGN NATIONAL INDIRECT HIRES                                    ..............  ..............         -12,000         -12,000         -12,000
     ADJUSTMENT (AIR NATIONAL GUARD) (HOUSE)                            ..............         -24,000  ..............  ..............         +24,000
     EXCESS WORKING CAPITAL FUND CARRYOVER                              ..............  ..............         -58,000         -58,000         -58,000
                                                                       =================================================================================
           TOTAL, OPERATION AND MAINTENANCE, AIR FORCE                      35,435,360      35,384,795      34,983,793        -451,567        -401,002
--------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                           2013 budget      Committee      Change from
 Line         Item          estimate     recommendation  budget estimate
------------------------------------------------------------------------
  011A PRIMARY COMBAT       2,973,141       2,903,141         -70,000
        FORCES
           Transfer    ..............  ..............         -70,000
            to Title
            IX:
            Theater
            Security
            Package
  011C COMBAT               1,611,032       1,611,032  ...............
        ENHANCEMENT
        FORCES
           Global      ..............  ..............        [133,000]
            Hawk
            Block 30
            Operation
            s and
            Sustainme
            nt Costs
  011D AIR OPERATIONS       1,472,806       1,404,526         -68,280
        TRAINING
        (OJT,
        MAINTAIN
        SKILLS)
           Transfer    ..............  ..............         -68,280
            to Title
            IX: Flag
            Exercises
  011M DEPOT                5,545,470       5,537,470          -8,000
        MAINTENANCE
           Sustainmen  ..............  ..............          -8,000
            t Funding
            Decrease
            Not
            Accounted
            for In
            Budget
            Justifica
            tion for
            Cancellat
            ion of
            Light
            Attack
            Armed
            Reconnais
            sance
            Aircraft
  011Z BASE SUPPORT         2,595,032       2,597,532          +2,500
           Unjustifie  ..............  ..............         -12,500
            d Request
           Environmen  ..............  ..............         +15,000
            tal
            Conservat
            ion for
            Ranges to
            Address
            Shortfall
            s
  012A GLOBAL C3I AND         957,040         982,753         +25,713
        EARLY WARNING
           Transfer    ..............  ..............         +25,713
            from
            Research,
            Developme
            nt, Test
            and
            Evaluatio
            n, Air
            Force
            Line 59--
            Nuclear
            Weapons
            Support
  012C OTHER COMBAT           916,200         903,200         -13,000
        OPS SPT
        PROGRAMS
           Budget      ..............  ..............         -13,000
            Justifica
            tion Does
            Not Match
            Summary
            of Price
            and
            Program
            Changes
            for the
            Defense
            Informati
            on
            Services
            Agency
            [DISA]
            Bill
  013C SPACE CONTROL          488,762         463,762         -25,000
        SYSTEMS
           Decrease    ..............  ..............         -25,000
            for Air
            Force
            Satellite
            Control
            Network
            Not
            Properly
            Accounted
            for in
            Budget
            Justifica
            tion
  015A COMBATANT              862,979         850,979         -12,000
        COMMANDERS
        DIRECT
        MISSION
        SUPPORT
           Civilian    ..............  ..............         -12,000
            Pay
            Inconsist
            ency for
            Joint
            Forces
            Command
            Restructu
            re
  042A ADMINISTRATION         587,654         581,154          -6,500
           Unjustifie  ..............  ..............          -6,500
            d
            Increase
            for
            Personnel
            Service
            Delivery
  042I CIVIL AIR               23,904          28,404          +4,500
        PATROL
           Civil Air   ..............  ..............          +4,500
            Patrol
UNDIST Unjustified     ..............  ..............        -226,000
        Growth For
        Civilian
        Personnel
        Compensation
UNDIST Incorrect       ..............  ..............         -12,000
        Pricing
        Adjustment
        for Foreign
        National
        Indirect
        Hires
UNDIST Excess Working  ..............  ..............         -58,000
        Capital Fund
        Carry Over
UNDIST Retain Air      ..............  ..............         +14,500
        Force Force
        Structure
------------------------------------------------------------------------

                Operation and Maintenance, Defense-Wide

Appropriations, 2012.................................... $30,152,008,000
Budget estimate, 2013...................................  31,993,013,000
House allowance.........................................  31,740,813,000
Committee recommendation................................  31,331,839,000

    The Committee recommends an appropriation of 
$31,331,839,000. This is $661,174,000 below the budget 
estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                [In thousands of dollars]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2013 budget        House         Committee   -------------------------------
                                         Item                                estimate        allowance    recommendation      Budget           House
                                                                                                                             estimate        allowance
--------------------------------------------------------------------------------------------------------------------------------------------------------
                  OPERATION AND MAINTENANCE, DEFENSE-WIDE

     BUDGET ACTIVITY 1: OPERATING FORCES

     JOINT CHIEFS OF STAFF                                                     485,708         485,708         475,708         -10,000         -10,000
     SPECIAL OPERATIONS COMMAND                                              5,091,001       5,100,101       4,497,120        -593,881        -602,981
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 1                                          5,576,709       5,585,809       4,972,828        -603,881        -612,981

     BUDGET ACTIVITY 3: TRAINING AND RECRUITING

     DEFENSE ACQUISITION UNIVERSITY                                            147,210         147,210         147,210  ..............  ..............
     NATIONAL DEFENSE UNIVERSITY                                                84,999          81,999          84,999  ..............          +3,000
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 3                                            232,209         229,209         232,209  ..............          +3,000

     BUDGET ACTIVITY 4: ADMIN & SERVICEWIDE ACTIVITIES

     CIVIL MILITARY PROGRAMS                                                   161,294         171,294         171,294         +10,000  ..............
     DEFENSE CONTRACT AUDIT AGENCY                                             573,973         573,973         573,973  ..............  ..............
     DEFENSE CONTRACT MANAGEMENT AGENCY                                      1,293,196       1,292,596       1,293,196  ..............            +600
     DEFENSE FINANCE AND ACCOUNTING SERVICE                                     17,513          17,513          17,513  ..............  ..............
     DEFENSE HUMAN RESOURCES ACTIVITY                                          676,186         676,186         676,186  ..............  ..............
     DEFENSE INFORMATION SYSTEMS AGENCY                                      1,346,847       1,346,847       1,336,847         -10,000         -10,000
     DEFENSE LEGAL SERVICES AGENCY                                              35,137          35,137          35,137  ..............  ..............
     DEFENSE LOGISTICS AGENCY                                                  431,893         441,893         434,393          +2,500          -7,500
     DEFENSE MEDIA ACTIVITY                                                    224,013         224,013         224,013  ..............  ..............
     DEFENSE POW/MISSING PERSONS OFFICE                                         21,964          21,964          21,964  ..............  ..............
     DEFENSE SECURITY COOPERATION AGENCY                                       557,917         542,917         542,917         -15,000  ..............
     DEFENSE SECURITY SERVICE                                           ..............  ..............         506,662        +506,662        +506,662
     DEFENSE TECHNOLOGY SECURITY AGENCY                                         35,319          35,319          35,319  ..............  ..............
     DEFENSE THREAT REDUCTION AGENCY                                    ..............  ..............         443,382        +443,382        +443,382
     DEPARTMENT OF DEFENSE EDUCATION ACTIVITY                                2,744,971       2,744,971       2,787,971         +43,000         +43,000
     MISSILE DEFENSE AGENCY                                                    259,975         259,975         253,975          -6,000          -6,000
     OFFICE OF ECONOMIC ADJUSTMENT                                             253,437         263,437         220,437         -33,000         -43,000
     OFFICE OF THE SECRETARY OF DEFENSE                                      2,095,362       2,105,362       2,081,762         -13,600         -23,600
     WASHINGTON HEADQUARTERS SERVICES                                          521,297         521,297         509,297         -12,000         -12,000
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 4                                         11,250,294      11,274,694      12,166,238        +915,944        +891,544

     OSD IDENTIFIED SCHOOL CAPACITY OR CONDITION SHORTFALL.             ..............         -51,000  ..............  ..............         +51,000
     IMPACT AID                                                         ..............          40,000          40,000         +40,000  ..............
     IMPACT AID FOR CHILDREN WITH DISABILITIES                          ..............  ..............           5,000          +5,000          +5,000
     OTHER PROGRAMS                                                         14,933,801      14,702,101      13,915,564      -1,018,237        -786,537
     ADJUSTMENT (HOUSE)                                                 ..............         -40,000  ..............  ..............         +40,000
                                                                       =================================================================================
           TOTAL, OPERATION AND MAINTENANCE, DEFENSE-WIDE                   31,993,013      31,740,813      31,331,839        -661,174        -408,974
--------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
       JOINT CHIEFS OF         485,708         475,708         -10,000
        STAFF
           Budget       ..............  ..............         -10,000
            Justificat
            ion Does
            Not Match
            Summary of
            Price and
            Program
            Changes
            for the
            Pentagon
            Reservatio
            n
            Maintenanc
            e
            Revolving
            Fund
       SPECIAL               5,091,001       4,497,120        -593,881
        OPERATIONS
        COMMAND
           Non-         ..............  ..............         -53,000
            Standard
            Aviation
            [NSAv] and
            Aviation
            Foreign
            Internal
            Defense
            [AvFID]
            Consolidat
            ion Excess
            to Need
           Unjustified  ..............  ..............         -40,000
            Growth in
            Per-
            Graduate
            Costs for
            Initial
            Skills
            Training
           Decrease     ..............  ..............         -15,000
            Shown in
            Spare and
            Repair
            Parts
            Metrics
            Not
            Properly
            Accounted
            for in
            Budget
            Justificat
            ion
           Classified   ..............  ..............         -42,707
            Adjustment
           Transfer to  ..............  ..............        -443,174
            Title IX:
            SOCOM-Iden
            tified
            Costs
            Moved into
            the Base
            Budget in
            Fiscal
            Year 2013
            Previously
            Funded in
            OCO
       CIVIL MILITARY          161,294         171,294         +10,000
        PROGRAMS
           Youth        ..............  ..............          +5,000
            Challenge
           STARBASE     ..............  ..............          +5,000
       DEFENSE               1,346,847       1,336,847         -10,000
        INFORMATION
        SYSTEMS AGENCY
           Program      ..............  ..............         -10,000
            Growth
            Requested
            for
            Circuit
            Transition
            Maintenanc
            e
            Unsupporte
            d by
            Program
            Metrics
       DEFENSE                 431,893         434,393          +2,500
        LOGISTICS
        AGENCY
           Unjustified  ..............  ..............          -7,500
            Growth for
            Virtual
            Interactiv
            e
            Processing
            Systems
            [VIPS]
           Procurement  ..............  ..............         +10,000
            Technical
            Assistance
       DEFENSE THREAT   ..............         443,382        +443,382
        REDUCTION
        AGENCY
           Transfer     ..............  ..............        +443,382
            from Other
            Programs
            Line for
            DTRA
            Budget
            Request
       DEPARTMENT OF         2,744,971       2,787,971         +43,000
        DEFENSE
        EDUCATION
        AGENCY
           Restore      ..............  ..............         +43,000
            Unjustifie
            d
            Reduction
       DEFENSE                 557,917         542,917         -15,000
        SECURITY
        COOPERATION
        AGENCY
           Authorizati  ..............  ..............         -15,000
            on
            Adjustment
            : Global
            Train and
            Equip
       DEFENSE          ..............         506,662        +506,662
        SECURITY
        SERVICE
           Transfer     ..............  ..............        +506,662
            from Other
            Programs
            Line for
            DSS Budget
            Request
       MISSILE DEFENSE         259,975         253,975          -6,000
        AGENCY
           THAAD        ..............  ..............          -6,000
            Excess to
            Requiremen
            t
       OFFICE OF               253,437         220,437         -33,000
        ECONOMIC
        ADJUSTMENT
           Mental       ..............  ..............         -33,000
            Health and
            Substance
            Abuse
            Facility
            and
            Regional
            Public
            Health
            Laboratory
            Funds
            Requested
            Ahead of
            Need
       OFFICE OF THE         2,095,362       2,081,762         -13,600
        SECRETARY OF
        DEFENSE
           Defense      ..............  ..............          -3,500
            Chief
            Management
            Office:
            Transfer
            to Defense
            Logistics
            Agency for
            Rental
            Payments
            Not
            Properly
            Accounted
            for in
            Budget
            Justificat
            ion
           OSD AT&L:    ..............  ..............          -4,000
            Realignmen
            t of
            Funding
            for
            Contingenc
            y Business
            Tools Not
            Properly
            Accounted
            for in
            Budget
            Justificat
            ion
           OSD Policy:  ..............  ..............          -3,500
            Transfer
            to Defense
            Logistics
            Agency for
            Continuity
            of
            Operations
            Not
            Properly
            Accounted
            for in
            Budget
            Justificat
            ion
           OSD P&R:     ..............  ..............          -2,600
            Transfer
            to
            Washington
            Headquarte
            rs Service
            for the
            Single
            Enterprise
            Contractin
            g Office
            Not
            Properly
            Accounted
            for in
            Budget
            Justificat
            ion
       WASHINGTON              521,297         509,297         -12,000
        HEADQUARTERS
        SERVICE
           Removal of   ..............  ..............         -12,000
            One-Time
            Fiscal
            Year 2012
            Cost for
            Centrally-
            Funded
            Mark
            Center
            Rent
       OTHER PROGRAMS       14,933,801      13,915,564      -1,018,237
           Transfer to  ..............  ..............        -506,662
            DSS for
            Budget
            Request
           Transfer to  ..............  ..............        -443,382
            DTRA for
            Budget
            Request
           Classified   ..............  ..............        -118,193
            Adjustment
           Additional   ..............  ..............         +50,000
            ISR
            Support to
            Operation
            Observant
            Compass--A
            uthorizati
            on
            Increase
UNDIST Impact Aid for   ..............  ..............          +5,000
        Children with
        Severe
        Disabilities--
        Authorization
        Increase
UNDIST Impact Aid--     ..............  ..............         +40,000
        Authorization
        Increase
------------------------------------------------------------------------

    Military Dependent Student Online Assistance.--The 
Committee understands children of active duty military families 
are faced with unique educational challenges in part because of 
frequent changes of station over the course of childhood. To 
better address these challenges, military parents can 
substantially benefit from access to Internet-based educational 
resources that can be brought to bear on the individualized 
needs of their children. The Department is encouraged to 
provide an assessment tool with accompanying resource material 
that helps parents to engage with children to develop 
conceptual understandings and to improve learning and skills.
    State and Local Partnerships.--The Committee encourages the 
Secretary of Defense, in conjunction with the services, to 
consider entering cooperative agreements with State and local 
governments for use of certain multiuse military facilities for 
public affairs activities that benefit local job creation, 
including commercial activities that promote American 
technology. The Committee expects any such agreements would be 
at no cost to the military and would not impede accomplishing 
the inherent mission of the facility.
    Defense Language and National Security Education Office.--
The Committee recognizes that, in partnership with universities 
across the country, the Defense Language and National Security 
Education Office provides critical training for servicemembers 
and government officials in a number of languages and strategic 
cultures, including those of the Arab world, Afghanistan, 
China, and Iran. The Committee encourages the Department of 
Defense to continue placing a high priority on these programs 
to ensure warfighters receive the language and culture training 
needed to complete their missions effectively and to ensure 
that inadequate funding levels do not delay or deny this 
valuable training.
    Military Use Airspace.--The Committee encourages the 
Department of Defense to continue to utilize national assets 
such as the Hays Military Operations Area to maintain airborne 
combat readiness for both manned and remotely piloted aircraft.
    Military Service Awards.--The Committee understands that 
the Department of Defense is committed to enhancing its ability 
to verify award of military decorations through a comprehensive 
database. At the present time, however, the process remains 
manually intensive and more work needs to be done to verify the 
authenticity of documentation and prevent the improper awarding 
of service awards. Therefore, the Committee encourages the 
Department of Defense to continue its efforts to improve its 
database in order to preserve the integrity of military service 
awards and to better ensure that veterans receive their due 
recognition.
    Middle East Regional Security Studies Programs.--The 
Committee encourages the Department of Defense to continue to 
support established university programs that promote region-
wide informal conferences and task forces on arms control, 
regional security, and related topics to the Middle East for 
Arab, Israeli and other officials and experts engaged in these 
issues.

                Operation and Maintenance, Army Reserve

Appropriations, 2012....................................  $3,071,733,000
Budget estimate, 2013...................................   3,162,008,000
House allowance.........................................   3,199,423,000
Committee recommendation................................   3,140,508,000

    The Committee recommends an appropriation of 
$3,140,508,000. This is $21,500,000 below the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                [In thousands of dollars]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2013 budget        House         Committee   -------------------------------
                                         Item                                estimate        allowance    recommendation      Budget           House
                                                                                                                             estimate        allowance
--------------------------------------------------------------------------------------------------------------------------------------------------------
                  OPERATION AND MAINTENANCE, ARMY RESERVE

     BUDGET ACTIVITY 1: OPERATING FORCES

     LAND FORCES
     MANEUVER UNITS                                                              1,391           1,391           1,391  ..............  ..............
     MODULAR SUPPORT BRIGADES                                                   20,889          20,889          20,889  ..............  ..............
     ECHELONS ABOVE BRIGADES                                                   592,724         592,724         586,724          -6,000          -6,000
     THEATER LEVEL ASSETS                                                      114,983         114,983         114,983  ..............  ..............
     LAND FORCES OPERATIONS SUPPORT                                            633,091         630,091         622,591         -10,500          -7,500
     AVIATION ASSETS                                                            76,823          76,823          76,823  ..............  ..............

     LAND FORCES READINESS
     FORCES READINESS OPERATIONS SUPPORT                                       481,997         480,147         481,997  ..............          +1,850
     LAND FORCES SYSTEM READINESS                                               70,118          70,118          70,118  ..............  ..............
     DEPOT MAINTENANCE                                                         141,205         189,205         141,205  ..............         -48,000

     LAND FORCES READINESS SUPPORT
     BASE OPERATIONS SUPPORT                                                   561,878         561,878         561,878  ..............  ..............
     FACILITIES SUSTAINMENT, RESTORATION & MODERNIZATION                       287,399         316,139         287,399  ..............         -28,740
     MANAGEMENT AND OPERATIONS HEADQUARTERS                                     52,431          52,431          52,431  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 1                                          3,034,929       3,106,819       3,018,429         -16,500         -88,390

     BUDGET ACTIVITY 4: ADMIN & SERVICEWIDE ACTIVITIES

     ADMINISTRATION AND SERVICEWIDE ACTIVITIES
     SERVICEWIDE TRANSPORTATION                                                 12,995          12,995          12,995  ..............  ..............
     ADMINISTRATION                                                             32,432          32,432          32,432  ..............  ..............
     SERVICEWIDE COMMUNICATIONS                                                  4,895           4,895           4,895  ..............  ..............
     PERSONNEL/FINANCIAL ADMINISTRATION                                         16,074          11,574          11,074          -5,000            -500
     RECRUITING AND ADVERTISING                                                 60,683          54,708          60,683  ..............          +5,975
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 4                                            127,079         116,604         122,079          -5,000          +5,475

     UNEXECUTABLE OPTEMPO GROWTH                                        ..............         -24,000  ..............  ..............         +24,000
                                                                       =================================================================================
           TOTAL, OPERATION AND MAINTENANCE, ARMY RESERVE                    3,162,008       3,199,423       3,140,508         -21,500         -58,915
--------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
   113 ECHELONS ABOVE          592,724         586,724          -6,000
        BRIGADE
           Budget       ..............  ..............          -6,000
            Justificat
            ion Does
            Not Match
            Summary of
            Price and
            Program
            Changes
            for Full
            Time
            Support
            Costs
   115 LAND FORCES             633,091         622,591         -10,500
        OPERATIONS
        SUPPORT
           Budget       ..............  ..............          -6,500
            Justificat
            ion Does
            Not Match
            Summary of
            Price and
            Program
            Changes
            for Full
            Time
            Support
            Costs
           Budget       ..............  ..............          -4,000
            Justificat
            ion Does
            Not Match
            Summary of
            Price and
            Program
            Changes
            for
            Management
            and
            Profession
            al
            Services
   433 PERSONNEL/               16,074          11,074          -5,000
        FINANCIAL
        ADMINISTRATION
           Unjustified  ..............  ..............          -5,000
            Growth for
            Civilian
            Personnel
------------------------------------------------------------------------

                Operation and Maintenance, Navy Reserve

Appropriations, 2012....................................  $1,305,134,000
Budget estimate, 2013...................................   1,246,982,000
House allowance.........................................   1,256,347,000
Committee recommendation................................   1,246,982,000

    The Committee recommends an appropriation of 
$1,246,982,000. This is equal to the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                [In thousands of dollars]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2013 budget        House         Committee   -------------------------------
                                         Item                                estimate        allowance    recommendation      Budget           House
                                                                                                                             estimate        allowance
--------------------------------------------------------------------------------------------------------------------------------------------------------
                  OPERATION AND MAINTENANCE, NAVY RESERVE

     BUDGET ACTIVITY 1: OPERATING FORCES

     RESERVE AIR OPERATIONS
     MISSION AND OTHER FLIGHT OPERATIONS                                       616,776         616,776         616,776  ..............  ..............
     INTERMEDIATE MAINTENANCE                                                   15,076          15,076          15,076  ..............  ..............
     AIR OPERATIONS AND SAFETY SUPPORT                                           1,479           1,479           1,479  ..............  ..............
     AIRCRAFT DEPOT MAINTENANCE                                                107,251         110,551         107,251  ..............          -3,300
     AIRCRAFT DEPOT OPERATIONS SUPPORT                                             355             355             355  ..............  ..............

     RESERVE SHIP OPERATIONS
     MISSION AND OTHER SHIP OPERATIONS                                          82,186          82,186          82,186  ..............  ..............
     SHIP OPERATIONAL SUPPORT AND TRAINING                                         589             589             589  ..............  ..............
     SHIP DEPOT MAINTENANCE                                                     48,593          48,593          48,593  ..............  ..............

     RESERVE COMBAT OPERATIONS SUPPORT
     COMBAT COMMUNICATIONS                                                      15,274          15,274          15,274  ..............  ..............
     COMBAT SUPPORT FORCES                                                     124,917         124,917         124,917  ..............  ..............

     RESERVE WEAPONS SUPPORT
     WEAPONS MAINTENANCE                                                         1,978           1,978           1,978  ..............  ..............
     ENTERPRISE INFORMATION TECHNOLOGY                                          43,699          43,699          43,699  ..............  ..............

     BASE OPERATING SUPPORT
     FACILITIES SUSTAINMENT, RESTORATION & MODERNIZATION                        60,646          66,711          60,646  ..............          -6,065
     BASE OPERATING SUPPORT                                                    105,227         105,227         105,227  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 1                                          1,224,046       1,233,411       1,224,046  ..............          -9,365

     BUDGET ACTIVITY 4: ADMIN & SERVICEWIDE ACTIVITIES

     ADMINISTRATION AND SERVICEWIDE ACTIVITIES
     ADMINISTRATION                                                              3,117           3,117           3,117  ..............  ..............
     MILITARY MANPOWER & PERSONNEL                                              14,337          14,337          14,337  ..............  ..............
     SERVICEWIDE COMMUNICATIONS                                                  2,392           2,392           2,392  ..............  ..............
     ACQUISITION AND PROGRAM MANAGEMENT                                          3,090           3,090           3,090  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 4                                             22,936          22,936          22,936  ..............  ..............
                                                                       =================================================================================
           TOTAL, OPERATION AND MAINTENANCE, NAVY RESERVE                    1,246,982       1,256,347       1,246,982  ..............          -9,365
--------------------------------------------------------------------------------------------------------------------------------------------------------

            Operation and Maintenance, Marine Corps Reserve

Appropriations, 2012....................................    $271,443,000
Budget estimate, 2013...................................     272,285,000
House allowance.........................................     277,377,000
Committee recommendation................................     272,285,000

    The Committee recommends an appropriation of $272,285,000. 
This is equal to the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                [In thousands of dollars]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2013 budget        House         Committee   -------------------------------
                                         Item                                estimate        allowance    recommendation      Budget           House
                                                                                                                             estimate        allowance
--------------------------------------------------------------------------------------------------------------------------------------------------------
              OPERATION AND MAINTENANCE, MARINE CORPS RESERVE

     BUDGET ACTIVITY 1: OPERATING FORCES

     EXPEDITIONARY FORCES
     OPERATING FORCES                                                           89,690          89,690          89,690  ..............  ..............
     DEPOT MAINTENANCE                                                          16,735          16,735          16,735  ..............  ..............
     FACILITIES SUSTAINMENT, RESTORATION & MODERNIZATION                        37,913          41,704          37,913  ..............          -3,791
     BASE OPERATING SUPPORT                                                    103,746         105,047         103,746  ..............          -1,301
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 1                                            248,084         253,176         248,084  ..............          -5,092

     BUDGET ACTIVITY 4: ADMIN & SERVICEWIDE ACTIVITIES

     ADMINISTRATION AND SERVICEWIDE ACTIVITIES
     SERVICEWIDE TRANSPORTATION                                                    873             873             873  ..............  ..............
     ADMINISTRATION                                                             14,330          14,330          14,330  ..............  ..............
     RECRUITING AND ADVERTISING                                                  8,998           8,998           8,998  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 4                                             24,201          24,201          24,201  ..............  ..............
                                                                       =================================================================================
           TOTAL, OPERATION & MAINTENANCE, MARINE CORPS RESERVE                272,285         277,377         272,285  ..............          -5,092
--------------------------------------------------------------------------------------------------------------------------------------------------------

              Operation and Maintenance, Air Force Reserve

Appropriations, 2012....................................  $3,274,359,000
Budget estimate, 2013...................................   3,166,482,000
House allowance.........................................   3,362,041,000
Committee recommendation................................   3,227,382,000

    The Committee recommends an appropriation of 
$3,227,382,000. This is $60,900,000 above the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                [In thousands of dollars]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2013 budget        House         Committee   -------------------------------
                                         Item                                estimate        allowance    recommendation      Budget           House
                                                                                                                             estimate        allowance
--------------------------------------------------------------------------------------------------------------------------------------------------------
                OPERATION AND MAINTENANCE, AIR FORCE RESERVE

     BUDGET ACTIVITY 1: OPERATING FORCES

     AIR OPERATIONS
     PRIMARY COMBAT FORCES                                                   2,089,326       1,985,215       2,089,326  ..............        +104,111
     MISSION SUPPORT OPERATIONS                                                112,992         112,992         112,992  ..............  ..............
     DEPOT MAINTENANCE                                                         406,101         536,998         406,101  ..............        -130,897
     FACILITIES SUSTAINMENT, RESTORATION & MODERNIZATION                        71,564          78,720          71,564  ..............          -7,156
     BASE OPERATING SUPPORT                                                    364,862         364,862         364,862  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 1                                          3,044,845       3,078,787       3,044,845  ..............         -33,942

     BUDGET ACTIVITY 4: ADMIN & SERVICEWIDE ACTIVITIES

     ADMINISTRATION AND SERVICEWIDE ACTIVITIES
     ADMINISTRATION                                                             78,824          78,824          78,824  ..............  ..............
     RECRUITING AND ADVERTISING                                                 16,020          16,020          16,020  ..............  ..............
     MILITARY MANPOWER AND PERSONNEL MANAGEMENT                                 19,496          19,496          19,496  ..............  ..............
     OTHER PERSONNEL SUPPORT                                                     6,489           6,489           6,489  ..............  ..............
     AUDIOVISUAL                                                                   808             808             808  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 4                                            121,637         121,637         121,637  ..............  ..............

     RETAIN AIR FORCE RESERVE FORCE STRUCTURE                           ..............         161,617          66,400         +66,400         -95,217
     CIVILIAN PERSONNEL COMPENSATION                                    ..............  ..............          -5,500          -5,500          -5,500
                                                                       =================================================================================
           TOTAL, OPERATION AND MAINTENANCE, AIR FORCE RESERVE.              3,166,482       3,362,041       3,227,382         +60,900        -134,659
--------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
UNDIST Unjustified      ..............  ..............          -5,500
        Growth in
        Civilian
        Personnel
        Compensation
UNDIST Retain Air       ..............  ..............         +66,400
        Force Reserve
        Force
        Structure
------------------------------------------------------------------------

             Operation and Maintenance, Army National Guard

Appropriations, 2012....................................  $6,924,932,000
Budget estimate, 2013...................................   7,108,612,000
House allowance.........................................   7,187,731,000
Committee recommendation................................   7,075,042,000

    The Committee recommends an appropriation of 
$7,075,042,000. This is $33,570,000 below the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                [In thousands of dollars]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2013 budget        House         Committee   -------------------------------
                                         Item                                estimate        allowance    recommendation      Budget           House
                                                                                                                             estimate        allowance
--------------------------------------------------------------------------------------------------------------------------------------------------------
               OPERATION AND MAINTENANCE, ARMY NATIONAL GUARD

     BUDGET ACTIVITY 1: OPERATING FORCES

     LAND FORCES
     MANEUVER UNITS                                                            680,206         680,206         680,206  ..............  ..............
     MODULAR SUPPORT BRIGADES                                                  186,408         186,408         186,408  ..............  ..............
     ECHELONS ABOVE BRIGADE                                                    865,628         865,628         861,128          -4,500          -4,500
     THEATER LEVEL ASSETS                                                      112,651         112,651         112,651  ..............  ..............
     LAND FORCES OPERATIONS SUPPORT                                             36,091          36,091          36,091  ..............  ..............
     AVIATION ASSETS                                                           907,011         907,011         902,011          -5,000          -5,000

     LAND FORCES READINESS
     FORCE READINESS OPERATIONS SUPPORT                                        751,606         751,606         751,606  ..............  ..............
     LAND FORCES SYSTEMS READINESS                                              60,043          60,043          60,043  ..............  ..............
     LAND FORCES DEPOT MAINTENANCE                                             411,940         411,940         411,940  ..............  ..............

     LAND FORCES READINESS SUPPORT
     BASE OPERATIONS SUPPORT                                                   995,423         995,423         995,423  ..............  ..............
     FACILITIES SUSTAINMENT, RESTORATION & MODERNIZATION                       688,189         757,008         688,189  ..............         -68,819
     MANAGEMENT AND OPERATIONAL HEADQUARTERS                                   953,716         953,716         936,693         -17,023         -17,023
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 1                                          6,648,912       6,717,731       6,622,389         -26,523         -95,342

     BUDGET ACTIVITY 4: ADMIN & SERVICEWIDE ACTIVITIES

     ADMINISTRATION AND SERVICEWIDE ACTIVITIES
     SERVICEWIDE TRANSPORTATION                                                 11,806          11,806          11,806  ..............  ..............
     REAL ESTATE MANAGEMENT                                                      1,656           1,656           1,656  ..............  ..............
     ADMINISTRATION                                                             89,358          89,358          82,311          -7,047          -7,047
     SERVICEWIDE COMMUNICATIONS                                                 39,513          39,513          39,513  ..............  ..............
     MANPOWER MANAGEMENT                                                         7,224           7,224           7,224  ..............  ..............
     RECRUITING AND ADVERTISING                                                310,143         310,143         310,143  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 4                                            459,700         459,700         452,653          -7,047          -7,047

     RETAIN ARMY NATIONAL GUARD FORCE STRUCTURE                         ..............          10,300  ..............  ..............         -10,300
                                                                       =================================================================================
           TOTAL, OPERATION & MAINTENANCE, ARMY NATIONAL GUARD.              7,108,612       7,187,731       7,075,042         -33,570        -112,689
--------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
   113 ECHELONS ABOVE          865,628         861,128          -4,500
        BRIGADE
           Budget       ..............  ..............          -4,500
            Justificat
            ion Does
            Not Match
            Summary of
            Price and
            Program
            Changes
            for
            Management
            and
            Profession
            al
            Services
   116 AVIATION ASSETS         907,011         902,011          -5,000
           Budget       ..............  ..............          -5,000
            Justificat
            ion Does
            Not Match
            Summary of
            Price and
            Program
            Changes
            for Fuel
   133 MANAGEMENT AND          953,716         936,693         -17,023
        OPERATIONAL HQ
           Unjustified  ..............  ..............         -17,023
            Growth for
            Mission
            Support
   431 ADMINISTRATION           89,358          82,311          -7,047
           Unjustified  ..............  ..............          -7,047
            Growth for
            Mission
            Support
------------------------------------------------------------------------

    Advance Trauma Training Program for National Guard Homeland 
Response Forces [HRFs].--The Committee recognizes the valuable 
support universities, hospitals, and other military partners 
provide in implementing the emergency response trauma training 
requirements to start up Homeland Response Forces [HRFs] 
initiated in the 2010 Quadrennial Defense Review [QDR]. The 
Committee encourages the National Guard to continue working 
with these partners as the Guard converts Chemical, Biological, 
Radiological and Nuclear [CBRNE] Enhanced Response Force 
Packages to HRFs and to ensure our National Guard medical 
professionals have the best training possible so they are 
prepared to respond to emergency situations here and abroad.

             Operation and Maintenance, Air National Guard

Appropriations, 2012....................................  $6,098,780,000
Budget estimate, 2013...................................   6,015,455,000
House allowance.........................................   6,616,826,000
Committee recommendation................................   6,493,155,000

    The Committee recommends an appropriation of 
$6,493,155,000. This is $477,700,000 above the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                [In thousands of dollars]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2013 budget        House         Committee   -------------------------------
                                         Item                                estimate        allowance    recommendation      Budget           House
                                                                                                                             estimate        allowance
--------------------------------------------------------------------------------------------------------------------------------------------------------
               OPERATION AND MAINTENANCE, AIR NATIONAL GUARD

     BUDGET ACTIVITY 1: OPERATING FORCES

     AIR OPERATIONS
     AIRCRAFT OPERATIONS                                                     3,559,824       3,099,094       3,559,824  ..............        +460,730
     MISSION SUPPORT OPERATIONS                                                721,225         681,251         721,225  ..............         +39,974
     DEPOT MAINTENANCE                                                         774,875       1,555,079       1,034,875        +260,000        -520,204
     FACILITIES SUSTAINMENT, RESTORATION & MODERNIZATION                       270,709         297,780         270,709  ..............         -27,071
     BASE OPERATING SUPPORT                                                    624,443         624,443         624,443  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 1                                          5,951,076       6,257,647       6,211,076        +260,000         -46,571

     BUDGET ACTIVITY 4: ADMIN & SERVICEWIDE ACTIVITIES

     SERVICEWIDE ACTIVITIES
     ADMINISTRATION                                                             32,358          32,358          32,358  ..............  ..............
     RECRUITING AND ADVERTISING                                                 32,021          32,021          32,021  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BUDGET ACTIVITY 4                                             64,379          64,379          64,379  ..............  ..............

     RETAIN AIR NATIONAL GUARD FORCE STRUCTURE                          ..............         286,800         255,700        +255,700         -31,100
     FIREFIGHTING EQUIPMENT MAFFS (HOUSE)                               ..............           8,000  ..............  ..............          -8,000
     CIVILIAN PERRSONNEL COMPENSATION                                   ..............  ..............         -38,000         -38,000         -38,000
                                                                       =================================================================================
           TOTAL, OPERATION & MAINTENANCE, AIR NATIONAL GUARD                6,015,455       6,616,826       6,493,155        +477,700        -123,671
--------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
  011M DEPOT                   774,875       1,034,875        +260,000
        MAINTENANCE
           Air Force--  ..............  ..............        +260,000
            Identified
            Shortfall
            for
            Weapons
            System
            Sustainmen
            t
UNDIST Unjustified      ..............  ..............         -38,000
        Growth in
        Civilian
        Personnel
        Compensation
UNDIST Retain Air       ..............  ..............        +255,700
        National Guard
        Force
        Structure
------------------------------------------------------------------------

               U.S. Court of Appeals for the Armed Forces

Appropriations, 2012....................................     $13,861,000
Budget estimate, 2013...................................      13,516,000
House allowance.........................................      13,516,000
Committee recommendation................................      13,516,000

    The Committee recommends an appropriation of $13,516,000. 
This is equal to the budget estimate.

                    Environmental Restoration, Army

Appropriations, 2012....................................    $346,031,000
Budget estimate, 2013...................................     335,921,000
House allowance.........................................     335,921,000
Committee recommendation................................     335,921,000

    The Committee recommends an appropriation of $335,921,000. 
This is equal to the budget estimate.

                    Environmental Restoration, Navy

Appropriations, 2012....................................    $308,668,000
Budget estimate, 2013...................................     310,594,000
House allowance.........................................     310,594,000
Committee recommendation................................     310,594,000

    The Committee recommends an appropriation of $310,594,000. 
This is equal to the budget estimate.

                  Environmental Restoration, Air Force

Appropriations, 2012....................................    $525,453,000
Budget estimate, 2013...................................     529,263,000
House allowance.........................................     529,263,000
Committee recommendation................................     529,263,000

    The Committee recommends an appropriation of $529,263,000. 
This is equal to the budget estimate.

                Environmental Restoration, Defense-Wide

Appropriations, 2012....................................     $10,716,000
Budget estimate, 2013...................................      11,133,000
House allowance.........................................      11,133,000
Committee recommendation................................      11,133,000

    The Committee recommends an appropriation of $11,133,000. 
This is equal to the budget estimate.
    National Fish and Wildlife Foundation Public-Private 
Partnerships.--The Committee is aware of the emerging 
partnership with the Department of Defense [DOD], the Marine 
Corps and the congressionally chartered National Fish and 
Wildlife Foundation to conserve longleaf pine ecosystems. This 
public-private partnership leverages Federal, State, and 
private funding to maintain a healthy environment while 
preserving the mission capacity of the Marine Corps. The 
Committee encourages DOD to expand this partnership to other 
areas of the country to leverage funding and bring additional 
partners into DOD's natural resource conservation programs.

         Environmental Restoration, Formerly Used Defense Sites

Appropriations, 2012....................................    $326,495,000
Budget estimate, 2013...................................     237,543,000
House allowance.........................................     237,543,000
Committee recommendation................................     287,543,000

    The Committee recommends an appropriation of $287,543,000. 
This is $50,000,000 above the budget estimate to help address 
unfunded needs.

             Overseas Humanitarian, Disaster, and Civic Aid

Appropriations, 2012....................................    $107,662,000
Budget estimate, 2013...................................     108,759,000
House allowance.........................................     108,759,000
Committee recommendation................................     108,759,000

    The Committee recommends an appropriation of $108,759,000. 
This is equal to the budget estimate.

                  Cooperative Threat Reduction Account

Appropriations, 2012....................................    $508,219,000
Budget estimate, 2013...................................     519,111,000
House allowance.........................................     519,111,000
Committee recommendation................................     519,111,000

    The Committee recommends an appropriation of $519,111,000. 
This is equal to the budget estimate.

      Department of Defense Acquisition Workforce Development Fund

Appropriations, 2012....................................    $105,501,000
Budget estimate, 2013...................................     274,198,000
House allowance.........................................      50,198,000
Committee recommendation................................     720,000,000

    The Committee recommends an appropriation of $720,000,000. 
This is $445,802,000 above the budget estimate.
    The Defense Acquisition Workforce Development Fund was 
established to ensure that the Department of Defense 
acquisition workforce has the capacity, in both personnel and 
skills, needed to properly perform its mission, provide 
appropriate oversight of contractor performance, and ensure 
that the Department receives the best value for the expenditure 
of public resources. To accomplish this, the Department set out 
to hire and develop a substantial number of new acquisition 
professionals. According to the Department, fiscal year 2008 
had the lowest number of acquisition professionals in this 
century. Since then, the acquisition workforce has grown from 
approximately 125,800 to 151,200 which equates to over 20-
percent growth. Department officials stated that the hiring in 
fiscal year 2012 completes the manning requirements needed to 
improve its acquisition workforce. After fiscal year 2012, new 
acquisition professionals will be hired only to sustain current 
manning levels. The fiscal year 2013 budget request proposes 
$274,198,000 to meet the Department's statutory funding level 
of $944,000,000; a growth of $224,000,000 over the fiscal year 
2012 statutory funding level. Given that the Department has 
completed expansion of its acquisition workforce in fiscal year 
2012, an increase in funding above the fiscal year 2012 level 
is not justified. Therefore, the Committee recommends the 
fiscal year 2012 statutory funding level of $720,000,000.

                               TITLE III

                              PROCUREMENT

    Funds appropriated under this title provide the resources 
required to purchase military equipment and hardware, including 
aircraft, ships, missiles, combat vehicles, ammunition, 
weapons, electronic sensors and communications equipment, and 
other procurement items.
    The President's fiscal year 2013 budget requests a total of 
$97,194,677,000 for procurement appropriations.

                      SUMMARY OF COMMITTEE ACTION

    The Committee recommends procurement appropriations 
totaling $97,635,496,000 for fiscal year 2013. This is 
$440,819,000 above the budget estimate.
    Committee recommended procurement appropriations for fiscal 
year 2013 are summarized below:

                                      SUMMARY OF PROCUREMENT APPROPRIATIONS
                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                                                    Change from
                             Account                                2013 budget      Committee        budget
                                                                     estimate     recommendation     estimate
----------------------------------------------------------------------------------------------------------------
Procurement:
    Aircraft Procurement, Army..................................       5,853,729       5,414,061        -439,668
    Missile Procurement, Army...................................       1,302,689       1,429,665        +126,976
    Procurement of WTCV, Army...................................       1,501,706       1,687,823        +186,117
    Procurement of Ammunition, Army.............................       1,739,706       1,624,380        -115,326
    Other Procurement, Army.....................................       6,326,245       4,980,209      -1,346,036
    Aircraft Procurement, Navy..................................      17,129,296      16,936,358        -192,938
    Weapons Procurement, Navy...................................       3,117,578       3,066,919         -50,659
    Procurement of Ammunition, Navy and Marine Corps............         759,539         719,154         -40,385
    Shipbuilding and Conversion, Navy...........................      13,579,845      15,614,855      +2,035,010
    Other Procurement, Navy.....................................       6,169,378       6,170,286            +908
    Procurement, Marine Corps...................................       1,622,955       1,334,448        -288,507
    Aircraft Procurement, Air Force.............................      11,002,999      11,260,646        +257,647
    Missile Procurement, Air Force..............................       5,491,846       4,913,276        -578,570
    Procurement of Ammunition, Air Force........................         599,194         593,194          -6,000
    Other Procurement, Air Force................................      16,720,848      17,008,348        +287,500
    Procurement, Defense-Wide...................................       4,187,935       4,692,685        +504,750
    Defense Production Act Purchases............................          89,189         189,189        +100,000
                                                                 -----------------------------------------------
      Total.....................................................      97,194,677      97,635,496        +440,819
----------------------------------------------------------------------------------------------------------------

    Procurement Budget Exhibits.--The fiscal year 2013 
procurement budget exhibits were generated, for the first time, 
using a standard Extensible Markup Language [XML] process. The 
Committee notes that while there was some improvement to data 
presentation, additional improvement is needed. The 
justification material did not contain complete and accurate 
data. In some cases basic data was missing from the documents 
requiring a separate inquiry to the services. Additionally, the 
new format for modification programs is very difficult to 
review. For example, one modification program that was 
presented on 10 pages in the fiscal year 2012 exhibits is 
spread across 20 pages in the fiscal year 2013 exhibits. The 
Under Secretary of Defense, Comptroller is encouraged to make 
improvements to the exhibit formats that will improve the 
presentation of the exhibits and ensure complete and accurate 
data is presented.
    Organic Industrial Base of the United States Military.--The 
Committee notes that the organic industrial base of the United 
States military advances a vital national security interest by 
producing necessary materials, munitions, and hardware when 
sources outside of the United States military are unable to 
meet this urgent need quickly. The Committee believes that the 
capacity of the organic industrial base of the United States 
military must be maintained and reminds the Department to 
carefully weigh any action that would deteriorate this 
essential capability.
    Drinking Water Supply Alternatives.--The Committee notes 
with approval that the Army and Marine Corps plan to use a 
portion of their funding for medical combat support equipment 
to purchase water purifications systems. However, the Committee 
notes that the Army and Marine Corps still overwhelmingly rely 
on bottled water in field operations and exercises. Not only is 
bottled water far more expensive than water purified by small 
unit remote portable systems, but reliance on bottled water 
leads to thousands of pounds of discarded plastic water bottles 
every year. The Committee encourages the Army and Marine Corps 
to jointly develop a plan to acquire drinking water supply 
alternatives to eliminate reliance on bottled water for field 
personnel.
    Joint Strike Fighter [JSF] Advance Procurement.--The fiscal 
year 2013 budget request includes: $65,000,000 for Navy JSF 
advance procurement, which equates to $16,200,000 per aircraft; 
$106,000,000 for Marine Corps advance procurement, which 
equates to $17,600,000 per aircraft; and $293,000,000 for Air 
Force advance procurement, which equates to $15,400,000 per 
aircraft. The Committee notes that the Navy and Marine Corp 
funding covers 12 months of advance procurement requirements 
whereas the Air Force funding covers only 8 to 9 months of 
advance procurement requirements. The Committee is concerned 
with the inconsistency in coverage of advance procurement 
requirements among the different variants and directs the 
program office to review the inconsistencies and make changes 
as necessary to fully fund advance procurement requirements.
    Diminishing Manufacturing Sources [DMS].--The Committee 
supports the Department's proactive approach to ensure the 
ability to sustain future production capabilities by addressing 
diminishing manufacturing sources but is concerned with 
increased DMS costs within a number of tactical missile 
procurement programs.
    For example, from fiscal year 2008 to fiscal year 2013, DMS 
costs within the Advanced Medium Range Air-to-Air Missile 
[AMRAAM] program in the Weapons Procurement, Navy and Missile 
Procurement, Air Force accounts increased fourfold. The Navy's 
Standard Missile 6 [SM-6] program is also reporting increases 
in DMS costs due to the end of Standard Missile 2 [SM-2] 
production and a reduced procurement of common components 
shared between SM-6 and SM-2. In fiscal year 2013, the Air 
Force's Joint Air-to-Surface Standoff Missile [JASSM] began to 
evaluate DMS and obsolescence issues, indicating the potential 
for future increases in DMS costs.
    Given the cross-cutting nature of this supplier issue, the 
Committee directs the Departments of the Navy and the Air Force 
to conduct a comprehensive review of the management of DMS 
within tactical missile procurement programs. This report shall 
include identification of the cost drivers for DMS within these 
programs, a discussion of the common suppliers, a comparison of 
DMS costs and approaches to funding among tactical missile 
programs, and the impact of declining foreign military sales on 
DMS costs. This report shall be submitted not later than 180 
days after enactment of this act. In addition, the Committee 
directs the Departments of the Navy and the Air Force to report 
DMS costs separately from missile unit cost analysis to enhance 
the Committee's ability to oversee these costs.
    Ordnance Plant Recapitalization.--The Committee notes that 
the Department of Defense [DOD] does not have a long-term 
strategic capital improvement plan in place to support its 
aging ordnance plants. These facilities are supporting a 
multitude of DOD requirements, yet these activities could be 
disrupted if basic infrastructure needs, such as heating and 
cooling, safety, and environmental hazards, are not addressed 
in the near future. Therefore, the Committee directs the 
Secretary of Defense to submit a multiyear recapitalization 
plan for the ordnance plants, including the industrial reserve, 
to the congressional defense committees not later than 90 days 
after enactment of this act. The Committee encourages the 
Department to include the required funds in future budget 
requests based on the most urgent needs identified.
    Special Material Decoys.--Special Material Decoys [SMDs] 
have been credited with saving the lives of countless service 
men and women as well as over 100 U.S. and coalition aircraft 
in Operation Enduring Freedom alone. The Committee encourages 
the Secretary of Defense to adequately resource the production 
and research and development of these decoys. Additionally, the 
Committee encourages the services to coordinate their purchases 
of such decoys so as to maximize efficiencies of scale and 
avoid production breaks.
    Advanced Medium Range Air-to-Air Missile [AMRAAM].--The 
Committee recommends a reduction of $38,324,000 for the 
procurement of AMRAAM in the Weapons Procurement, Navy and 
Missile Procurement, Air Force accounts and a rescission of 
$60,334,000 from prior year appropriations. The recommendation 
fully funds the requested quantity of 180 missiles. However, 
due to lower than expected unit costs negotiated in the Lot 26 
contract award, the program has excess prior year funding and 
the fiscal year 2013 request is excess to the requirement.
    Small Tactical Unmanned Aircraft System [STUAS]/RQ-21 
UAS.--The initial requirement for the STUAS program was derived 
from Urgent Universal Needs Statements issued in 2004 and 2005. 
The program has an approved Capability Development Document 
from 2008, but no approved Capability Production Document. 
Milestone C is currently scheduled for the second quarter of 
fiscal year 2013 after a recent 4-month delay in the program. 
The program states that the delay to Milestone C will not 
impact the delivery of initial operational capability [IOC] 
because the schedule risk will be mitigated by beginning test 
events early and combining developmental and operational test 
events.
    The Committee recommends the Joint Requirements Oversight 
Council [JROC] review this program since its requirements and 
costs have not been validated. Furthermore, the Committee is 
concerned with the recent schedule compression and concurrency 
between developmental testing and planned production. Moreover, 
the current program schedule shows Milestone C occurring before 
the operational testing final report is complete. The Committee 
recommends Milestone C occur after the final test report is 
issued to ensure the decision to move into production is fully 
informed. The Committee also urges the Department of the Navy 
Service Acquisition Executive to review the strategy, schedule, 
and test plans for this program. Due to the schedule risk and 
program concurrency, the Committee fully funds research and 
development but provides no procurement funds in fiscal year 
2013.

                       Aircraft Procurement, Army

Appropriations, 2012....................................  $5,360,334,000
Budget estimate, 2013...................................   5,853,729,000
House allowance.........................................   6,115,226,000
Committee recommendation................................   5,414,061,000

    The Committee recommends an appropriation of 
$5,414,061,000. This is $439,668,000 below the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                                     [Dollars in thousands]
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                                     Change from               Change from
Line                            Item                              Qty.     2013 budget      Qty.   House allowance    Qty.      Committee    ---------------------------------------------------
                                                                             estimate                                         recommendation    Qty.   Budget estimate    Qty.   House allowance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                    AIRCRAFT PROCUREMENT, ARMY

     AIRCRAFT

     FIXED WING
   1 UTILITY F/W CARGO AIRCRAFT                                     2          $18,639        2          $18,639        2          $16,439  .......          -$2,200  .......          -$2,200
   3 MQ-1 UAV                                                      19          518,088       19          518,088  .......  ...............      -19         -518,088      -19         -518,088
   4 RQ-11 (RAVEN)                                                234           25,798      234           25,798  .......  ...............     -234          -25,798     -234          -25,798

     ROTARY
   6 HELICOPTER, LIGHT UTILITY [LUH]                               34          271,983       37          295,980       35          271,983       +1  ...............       -2          -23,997
   7 AH-64 APACHE BLOCK IIIA REMAN                                 40          577,115       40          577,115       40          507,115  .......          -70,000  .......          -70,000
   8 AH-64 APACHE BLOCK IIIA REMAN (AP-CY)                    .......          107,707  .......          107,707  .......           98,807  .......           -8,900  .......           -8,900
   9 AH-64 APACHE BLOCK IIIB NEW BUILD                              8          153,993        8          153,993       12          295,993       +4         +142,000       +4         +142,000
  10 AH-64 APACHE BLOCK IIIB NEW BUILD (AP-CY)                .......          146,121  .......          146,121  .......          130,421  .......          -15,700  .......          -15,700
  13 UH-60 BLACKHAWK (MYP)                                         59        1,107,087       69        1,306,087       62        1,166,787       +3          +59,700       -7         -139,300
  14 UH-60 BLACKHAWK (MYP) (AP-CY)                            .......          115,113  .......          115,113  .......          115,113  .......  ...............  .......  ...............
  15 CH-47 HELICOPTER                                              38        1,076,036       38        1,076,036       46        1,252,036       +8         +176,000       +8         +176,000
  16 CH-47 HELICOPTER (AP-CY)                                 .......           83,346  .......           83,346  .......           83,346  .......  ...............  .......  ...............
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, AIRCRAFT                                    .......        4,201,026  .......        4,424,023  .......        3,938,040  .......         -262,986  .......         -485,983

     MODIFICATION OF AIRCRAFT
  18 MQ-1 PAYLOAD--UAS                                        .......          231,508  .......          231,508  .......  ...............  .......         -231,508  .......         -231,508
  20 GUARDRAIL MODS (MIP)                                     .......           16,272  .......           16,272  .......           16,272  .......  ...............  .......  ...............
  21 MULTI SENSOR ABN RECON (MIP)                             .......            4,294  .......            4,294  .......            4,294  .......  ...............  .......  ...............
  22 AH-64 MODS                                               .......          178,805  .......          178,805  .......          178,805  .......  ...............  .......  ...............
  23 CH-47 CARGO HELICOPTER MODS                              .......           39,135  .......           57,635  .......           87,935  .......          +48,800  .......          +30,300
  24 UTILITY/CARGO AIRPLANE MODS                              .......           24,842  .......           24,842  .......           24,842  .......  ...............  .......  ...............
  26 UTILITY HELICOPTER MODS                                  .......           73,804  .......           93,804  .......          283,804  .......         +210,000  .......         +190,000
  27 KIOWA WARRIOR                                            .......          192,484  .......          192,484  .......           83,584  .......         -108,900  .......         -108,900
  29 NETWORK AND MISSION PLAN                                 .......          190,789  .......          190,789  .......          190,789  .......  ...............  .......  ...............
  30 COMMS, NAV SURVEILLANCE                                  .......          133,191  .......          133,191  .......          133,191  .......  ...............  .......  ...............
  31 GATM ROLLUP                                              .......           87,280  .......           87,280  .......           87,280  .......  ...............  .......  ...............
  32 RQ-7 UAV MODS                                            .......          104,339  .......          104,339  .......            9,265  .......          -95,074  .......          -95,074
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, MODIFICATION OF AIRCRAFT                    .......        1,276,743  .......        1,315,243  .......        1,100,061  .......         -176,682  .......         -215,182

     SUPPORT EQUIPMENT AND FACILITIES

     GROUND SUPPORT AVIONICS
  34 AIRCRAFT SURVIVABILITY EQUIPMENT                         .......           34,037  .......           34,037  .......           34,037  .......  ...............  .......  ...............
  36 CMWS                                                     .......          127,751  .......          127,751  .......          127,751  .......  ...............  .......  ...............

     OTHER SUPPORT
  37 AVIONICS SUPPORT EQUIPMENT                               .......            4,886  .......            4,886  .......            4,886  .......  ...............  .......  ...............
  38 COMMON GROUND EQUIPMENT                                  .......           82,511  .......           82,511  .......           82,511  .......  ...............  .......  ...............
  39 AIRCREW INTEGRATED SYSTEMS                               .......           77,381  .......           77,381  .......           77,381  .......  ...............  .......  ...............
  40 AIR TRAFFIC CONTROL                                      .......           47,235  .......           47,235  .......           47,235  .......  ...............  .......  ...............
  41 INDUSTRIAL FACILITIES                                    .......            1,643  .......            1,643  .......            1,643  .......  ...............  .......  ...............
  42 LAUNCHER, 2.75 ROCKET                                        464              516      464              516      464              516  .......  ...............  .......  ...............
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, SUPPORT EQUIPMENT AND FACILITIES            .......          375,960  .......          375,960  .......          375,960  .......  ...............  .......
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, AIRCRAFT PROCUREMENT, ARMY                  .......        5,853,729  .......        6,115,226  .......        5,414,061  .......         -439,668  .......         -701,165
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
Line         Item           2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
   1Utility F/W                 18,639          16,439          -2,200
     Aircraft
        Test funding    ..............  ..............          -2,200
         early to need
   3MQ-1 UAV                   518,088  ..............        -518,088
        Transfer to     ..............  ..............        -414,088
         Title IX
        Schedule        ..............  ..............        -104,000
         delays and
         prior year
         unobligated
         balances
   4RQ-11 (RAVEN)               25,798  ..............         -25,798
        Transfer to     ..............  ..............         -25,798
         Title IX
   6Helicopter, Light          271,983         271,983  ..............
     Utility [LUH]
        Unjustified     ..............  ..............          -8,000
         economic
         change orders
         [ECO] cost
         growth--trans
         fer to
         replace
         National
         Guard
         training loss
        National Guard  ..............  ..............          +8,000
         training
         loss--transfe
         rred from ECO
         cost growth
   7AH-64 Apache Block         577,115         507,115         -70,000
     IIIA Reman
        Unjustified     ..............  ..............         -70,000
         unit cost
         increase
   8AH-64 Apache Block         107,707          98,807          -8,900
     IIIA Reman [AP-
     CY]
        Excess advance  ..............  ..............          -8,900
         procurement
   9AH-64 Apache Block         153,993         295,993        +142,000
     IIIB New Build
        Additional      ..............  ..............        +142,000
         Apache
         aircraft (4)
  10AH-64 Apache Block         146,121         130,421         -15,700
     IIIB New Build
     [AP-CY]
        Excess advance  ..............  ..............         -15,700
         procurement
  13UH-60 Blackhawk M        1,107,087       1,166,787         +59,700
     Model [MYP]
        UH-60s- 3       ..............  ..............         +59,700
         additional
         aircraft
  15CH-47 Helicopter         1,076,036       1,252,036        +176,000
        CH-47s--8       ..............  ..............        +176,000
         additional
         aircraft
  18MQ-1 Payload--UAS          231,508  ..............        -231,508
        Transfer to     ..............  ..............        -184,608
         Title IX
        Army requested  ..............  ..............         -46,900
         transfer to
         Army RDT&E
         Line 131 for
         EMAARS
  23CH-47 Cargo                 39,135          87,935         +48,800
     Helicopter Mods
     [MYP]
        CH-47 Cargo On/ ..............  ..............         +48,800
         Off Loading
         System
  26Utility Helicopter          73,804         283,804        +210,000
     Mods
        UH-60 A to L    ..............  ..............        +210,000
         conversions
         for ARNG
  27Kiowa Warrior Mods         192,484          83,584        -108,900
        Reduce the OH-  ..............  ..............         -37,200
         58 Recap
        Reduce cockpit  ..............  ..............         -71,700
         and sensor
         upgrade
         program--mile
         stone C
         slipped to
         fiscal year
         2015--early
         to need
  32RQ-7 UAV MODS              104,339           9,265         -95,074
        Ahead of need   ..............  ..............         -95,074
------------------------------------------------------------------------

    MQ-1C Gray Eagle.--The fiscal year 2013 budget request 
includes $518,088,000 to procure 19 additional MQ-1C aircraft. 
Since fiscal year 2012, the program has experienced several 
testing delays, reliability issues and is not currently meeting 
the operational availability key performance parameters. The 
Army has procured 84 of the planned 135 production aircraft, or 
about 62 percent of the planned procurement, yet has not 
completed its initial phase of testing. Therefore, the 
Committee recommends a reduction of $104,000,000 and four 
aircraft to maintain a quantity consistent with full rate 
production regulations.
    AH-64 Apache Block IIIA Remanufacture.--The fiscal year 
2013 budget request includes $577,115,000 to procure 40 
remanufactured helicopters and $107,707,000 for advance 
procurement for the subsequent lot of helicopters. The gross 
weapon system unit cost for these helicopters increased from 
$14,800,000 in fiscal year 2012 request to $19,200,000 in 
fiscal year 2013 request. The justification documents provided 
no justification for these cost increases. Therefore, the 
Committee recommends a reduction of $70,000,000 to the 
procurement request due to unjustified cost growth. 
Furthermore, the Committee recommends a reduction of $8,900,000 
for the advance procurement request, in line with fiscal year 
2012 funding levels.
    Kiowa Warrior Modifications.--The fiscal year 2013 request 
includes $192,484,000 to procure Kiowa Warrior modifications. 
The Committee notes funds are not needed in fiscal year 2013 
since production has been delayed until fiscal year 2015. 
Therefore, the Committee recommends a reduction of $108,900,000 
in the base request for Kiowa Warrior modifications. The 
Committee also recommends a reduction of $78,000,000 and seven 
aircraft, which maintains fiscal year 2012 levels. Since 
termination of the Armed Reconnaissance Helicopter program in 
2008, the Army has continually reviewed and discussed 
alternatives for replacing the Kiowa Warrior Helicopter. The 
Army is now planning to conduct a Voluntary Flight 
Demonstration [VFD] to evaluate options for fulfilling the 
Armed Scout requirement. The Committee directs the Department 
of the Army to complete the VFD and define the way ahead for 
its Armed Scout requirement to the congressional defense 
committees prior to obligating fiscal year 2013 replacement 
aircraft funding.
    RQ-7 Unmanned Aerial Vehicle [UAV] Modifications.--The 
fiscal year 2013 request includes $104,339,000 for 
modifications to the RQ-7 UAV. As of May 2012, the program had 
over $404,000,000 of fiscal year 2011 funding unobligated and 
all of the fiscal year 2012 funding unobligated. Therefore, the 
Committee recommends a reduction of $95,074,000.

                       Missile Procurement, Army

Appropriations, 2012....................................  $1,461,223,000
Budget estimate, 2013...................................   1,302,689,000
House allowance.........................................   1,602,689,000
Committee recommendation................................   1,429,665,000

    The Committee recommends an appropriation of 
$1,429,665,000. This is $126,976,000 above the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                                     [Dollars in thousands]
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                                     Change from               Change from
Line                            Item                              Qty.     2013 budget      Qty.   House allowance    Qty.      Committee    ---------------------------------------------------
                                                                             estimate                                         recommendation    Qty.   Budget estimate    Qty.   House allowance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                    MISSILE PROCUREMENT, ARMY

     OTHER MISSILES

     SURFACE-TO-AIR MISSILE SYSTEM
   1 PATRIOT SYSTEM SUMMARY                                        84         $646,590       84         $946,590      134         $840,822      +50        +$194,232      +50        -$105,768
   2 MSE MISSILE                                              .......           12,850  .......           12,850  .......            9,350  .......           -3,500  .......           -3,500

     AIR-TO-SURFACE MISSILE SYSTEM
   4 HELLFIRE SYS SUMMARY                                     .......            1,401  .......            1,401  .......            1,401  .......  ...............  .......  ...............

     ANTI-TANK/ASSAULT MISSILE SYSTEM
   5 JAVELIN (AAWS-M) SYSTEM SUMMARY                              400           81,121      400           81,121      400           81,121  .......  ...............  .......  ...............
   6 TOW 2 SYSTEM SUMMARY                                       1,403           64,712    1,403           64,712    1,403           64,712  .......  ...............  .......  ...............
   7 TOW 2 SYSTEM SUMMARY (AP-CY)                             .......           19,931  .......           19,931  .......           19,931  .......  ...............  .......  ...............
   8 GUIDED MLRS ROCKET [GMLRS]                                 1,608          218,679    1,608          218,679    1,608          207,423  .......          -11,256  .......          -11,256
   9 MLRS REDUCED RANGE PRACTICE ROCKETS [RRPR]                 2,430           18,767    2,430           18,767    2,430           16,267  .......           -2,500  .......           -2,500
  10 HIGH MOBILITY ARTILLERY ROCKET SYSTEM                    .......           12,051  .......           12,051  .......           12,051  .......  ...............  .......  ...............
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, OTHER MISSILES                              .......        1,076,102  .......        1,376,102  .......        1,253,078  .......         +176,976  .......         -123,024

     MODIFICATION OF MISSILES

     MODIFICATIONS
  11 PATRIOT MODS                                             .......          199,565  .......          199,565  .......          149,565  .......          -50,000  .......          -50,000
  13 MLRS MODS                                                .......            2,466  .......            2,466  .......            2,466  .......  ...............  .......  ...............
  14 HIMARS MODIFICATIONS                                     .......            6,068  .......            6,068  .......            6,068  .......  ...............  .......  ...............
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, MODIFICATION OF MISSILES                    .......          208,099  .......          208,099  .......          158,099  .......          -50,000  .......          -50,000

     SPARES AND REPAIR PARTS
  16 SPARES AND REPAIR PARTS                                  .......            7,864  .......            7,864  .......            7,864  .......  ...............  .......  ...............

     SUPPORT EQUIPMENT AND FACILITIES
  17 AIR DEFENSE TARGETS                                      .......            3,864  .......            3,864  .......            3,864  .......  ...............  .......  ...............
  18 ITEMS LESS THAN $5.0M (MISSILES)                         .......            1,560  .......            1,560  .......            1,560  .......  ...............  .......  ...............
  19 PRODUCTION BASE SUPPORT                                  .......            5,200  .......            5,200  .......            5,200  .......  ...............  .......  ...............
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, SUPPORT EQUIPMENT AND FACILITIES            .......           10,624  .......           10,624  .......           10,624  .......  ...............  .......
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, MISSILE PROCUREMENT, ARMY                   .......        1,302,689  .......        1,602,689  .......        1,429,665  .......         +126,976  .......         -173,024
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                           2013 budget      Committee       Change from
 Line         Item          estimate      recommendation  budget request
------------------------------------------------------------------------
     1 Patriot System         646,590         840,822         +194,232
        Summary
           Program     ..............  ...............        +194,232
            Adjustmen
            t to Meet
            Army
            Shortfall
     2 MSE Missile             12,850           9,350           -3,500
           Excess to   ..............  ...............          -3,500
            Requireme
            nt
     8 Guided MLRS            218,679         207,423          -11,256
        Rocket
        [GMLRS]
           Unit Cost   ..............  ...............         -11,256
            Efficienc
            ies
     9 MLRS Reduced            18,767          16,267           -2,500
        Range
        Practice
        Rockets
        [RRPR]
           Unit Cost   ..............  ...............          -2,500
            Efficienc
            ies
    11 Patriot Mods           199,565         149,565          -50,000
           Radar       ..............  ...............         -50,000
            Digital
            Processor
            Program
            Delay
------------------------------------------------------------------------

        Procurement of Weapons and Tracked Combat Vehicles, Army

Appropriations, 2012....................................  $2,070,405,000
Budget estimate, 2013...................................   1,501,706,000
House allowance.........................................   1,884,706,000
Committee recommendation................................   1,687,823,000

    The Committee recommends an appropriation of 
$1,687,823,000. This is $186,117,000 above the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                                     [Dollars in thousands]
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                                  Change from                 Change from
Line                          Item                            Qty.     2013 budget      Qty.   House allowance    Qty.      Committee    -------------------------------------------------------
                                                                         estimate                                         recommendation     Qty.    Budget estimate     Qty.    House allowance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                  PROCUREMENT OF W&TCV, ARMY

     TRACKED COMBAT VEHICLES
   1 STRYKER VEHICLE                                           58         $286,818       58         $286,818       58         $286,818  .........  ...............  .........  ...............

     MODIFICATION OF TRACKED COMBAT VEHICLES
   3 STRYKER (MOD)                                        .......           60,881  .......           60,881  .......           60,881  .........  ...............  .........  ...............
   4 FIST VEHICLE (MOD)                                   .......           57,257  .......           57,257  .......           57,257  .........  ...............  .........  ...............
   5 BRADLEY PROGRAM (MOD)                                .......          148,193  .......          288,193  .......          148,193  .........  ...............  .........        -$140,000
   6 HOWITZER, MED SP FT 155MM M109A6 (MOD)               .......           10,341  .......           10,341  .......            7,641  .........          -$2,700  .........           -2,700
   7 PALADIN PIPM MOD IN SERVICE                               17          206,101       17          206,101       17          206,101  .........  ...............  .........  ...............
   8 IMPROVED RECOVERY VEHICLE (M88A2 HERCU- LES)              31          107,909       49          169,909       31          230,909  .........         +123,000        -18          +61,000
   9 ARMORED BREACHER VEHICLE                                  10           50,039       10           50,039       10           50,039  .........  ...............  .........  ...............
  10 M88 FOV MODS                                         .......           29,930  .......           29,930  .......           29,930  .........  ...............  .........  ...............
  11 M1 ABRAMS TANK (MOD)                                 .......          129,090  .......          129,090  .......          129,090  .........  ...............  .........  ...............
  12 ABRAMS UPGRADE PROGRAM                                    21           74,433       21          255,433       21          165,433  .........          +91,000  .........          -90,000

     SUPPORT EQUIPMENT AND FACILITIES
  13 PRODUCTION BASE SUPPORT (TCV-WTCV)                   .......            1,145  .......            1,145  .......            1,145  .........  ...............  .........  ...............
                                                         ---------------------------------------------------------------------------------------------------------------------------------------
           TOTAL, TRACKED COMBAT VEHICLES                 .......        1,162,137  .......        1,545,137  .......        1,373,437  .........         +211,300  .........         -171,700

     WEAPONS AND OTHER COMBAT VEHICLES
  14 INTEGRATED AIR BURST WEAPON SYS FAMILY               .......              506  .......              506  .......              506  .........  ...............  .........  ...............
  17 LIGHTWEIGHT .50 CALIBER MACHINE GUN                      610           25,183      610           25,183  .......  ...............       -610          -25,183       -610          -25,183
  19 MORTAR SYSTEMS                                       .......            8,104  .......            8,104  .......            8,104  .........  ...............  .........  ...............
  21 XM320 GRENADE LAUNCHER MODULE [GLM]                    2,280           14,096    2,280           14,096    2,280           14,096  .........  ...............  .........  ...............
  24 M4 CARBINE 12,000                                     21,272           12,000   21,272           12,000   21,272  ...............  .........  ...............  .........
  25 SHOTGUN, MODULAR ACCESSORY SYSTEM [MASS]               2,107            6,598    2,107            6,598    2,107            6,598  .........  ...............  .........  ...............
  26 COMMON REMOTELY OPERATED WEAPONS STA- TION               240           56,725      240           56,725      240           56,725  .........  ...............  .........  ...............
  27 HOWITZER LT WT 155MM (T)                             .......           13,827  .......           13,827  .......           13,827  .........  ...............  .........  ...............

     MOD OF WEAPONS AND OTHER COMBAT VEH
  29 M777 MODS                                            .......           26,843  .......           26,843  .......           26,843  .........  ...............  .........  ...............
  30 M4 CARBINE MODS                                      .......           27,243  .......           27,243  .......           27,243  .........  ...............  .........  ...............
  31 M2 50 CAL MACHINE GUN MODS                           .......           39,974  .......           39,974  .......           39,974  .........  ...............  .........  ...............
  32 M249 SAW MACHINE GUN MODS                            .......            4,996  .......            4,996  .......            4,996  .........  ...............  .........  ...............
  33 M240 MEDIUM MACHINE GUN MODS                         .......            6,806  .......            6,806  .......            6,806  .........  ...............  .........  ...............
  34 SNIPER RIFLES MODIFICATIONS                          .......           14,113  .......           14,113  .......           14,113  .........  ...............  .........  ...............
  35 M119 MODIFICATIONS                                   .......           20,727  .......           20,727  .......           20,727  .........  ...............  .........  ...............
  36 M16 RIFLE MODS                                       .......            3,306  .......            3,306  .......            3,306  .........  ...............  .........  ...............
  37 MODIFICATIONS LESS THAN $5.0M (WOCV-WTCV)            .......            3,072  .......            3,072  .......            3,072  .........  ...............  .........  ...............

     SUPPORT EQUIPMENT AND FACILITIES
  38 ITEMS LESS THAN $5.0M (WOCV-WTCV)                    .......            2,026  .......            2,026  .......            2,026  .........  ...............  .........  ...............
  39 PRODUCTION BASE SUPPORT (WOCV-WTCV)                  .......           10,115  .......           10,115  .......           10,115  .........  ...............  .........  ...............
  40 INDUSTRIAL PREPAREDNESS                              .......              442  .......              442  .......              442  .........  ...............  .........  ...............
  41 SMALL ARMS EQUIPMENT (SOLDIER ENH PROG)              .......            2,378  .......            2,378  .......            2,378  .........  ...............  .........  ...............
                                                         ---------------------------------------------------------------------------------------------------------------------------------------
           TOTAL, WEAPONS AND OTHER COMBAT VEHICLES       .......          308,352  .......          308,352  .......          283,169  .........          -25,183  .........          -25,183

     SPARE AND REPAIR PARTS
  42 SPARES AND REPAIR PARTS (WTCV)                       .......           31,217  .......           31,217  .......           31,217  .........  ...............  .........  ...............
                                                         ---------------------------------------------------------------------------------------------------------------------------------------
           TOTAL, PROCUREMENT OF W&TCV, ARMY              .......        1,501,706  .......        1,884,706  .......        1,687,823  .........         +186,117  .........         -196,883
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                         2013 budget       Committee       Change from
Line        Item           estimate      recommendation   budget request
------------------------------------------------------------------------
   6Howitzer, Med             10,341            7,641           -2,700
     Sp Ft 155mm
     M109a6 (MOD)
        Unjustified  ...............  ...............           -2,700
         increase
         in
         contractor
         support
   8Improved                 107,909          230,909         +123,000
     Recovery
     Vehicle (M88a2
     Hercules)
        Authorizati  ...............  ...............         +123,000
         on
         Increase
  12Abrams Upgrade            74,433          165,433          +91,000
     Program
        Authorizati  ...............  ...............          +91,000
         on
         Increase
  17Lightweight .50           25,183  ...............          -25,183
     Caliber
     Machine Gun
        Program      ...............  ...............          -25,183
         cancellati
         on by Army
------------------------------------------------------------------------

                    Procurement of Ammunition, Army

Appropriations, 2012....................................  $1,884,424,000
Budget estimate, 2013...................................   1,739,706,000
House allowance.........................................   1,576,768,000
Committee recommendation................................   1,624,380,000

    The Committee recommends an appropriation of 
$1,624,380,000. This is $115,326,000 below the budget estimate.

                     committee recommended program

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                                     [Dollars in thousands]
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                                     Change from               Change from
Line                            Item                              Qty.     2013 budget      Qty.   House allowance    Qty.      Committee    ---------------------------------------------------
                                                                             estimate                                         recommendation    Qty.   Budget estimate    Qty.   House allowance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                 PROCUREMENT OF AMMUNITION, ARMY

     AMMUNITION

     SMALL/MEDIUM CAL AMMUNITION
   1 CTG, 5.56MM, ALL TYPES                                   .......         $158,313  .......         $123,513  .......         $158,313  .......  ...............  .......         +$34,800
   2 CTG, 7.62MM, ALL TYPES                                   .......           91,438  .......           91,438  .......           91,438  .......  ...............  .......  ...............
   3 CTG, HANDGUN, ALL TYPES                                  .......            8,954  .......            8,954  .......            8,954  .......  ...............  .......  ...............
   4 CTG, .50 CAL, ALL TYPES                                  .......          109,604  .......          109,604  .......          109,604  .......  ...............  .......  ...............
   5 CTG, 20MM, ALL TYPES                                     .......            4,041  .......            4,041  .......            4,041  .......  ...............  .......  ...............
   6 CTG, 25MM, ALL TYPES                                     .......           12,654  .......           12,654  .......           12,654  .......  ...............  .......  ...............
   7 CTG, 30MM, ALL TYPES                                     .......           72,154  .......           54,154  .......           52,154  .......         -$20,000  .......           -2,000
   8 CTG, 40MM, ALL TYPES                                     .......           60,138  .......  ...............  .......           60,138  .......  ...............  .......          +60,138

     MORTAR AMMUNITION
   9 D60MM MORTAR, ALL TYPES                                  .......           44,375  .......           44,375  .......           44,375  .......  ...............  .......  ...............
  10 D81MM MORTAR, ALL TYPES                                  .......           27,471  .......           27,471  .......           27,471  .......  ...............  .......  ...............
  11 D120MM MORTAR, ALL TYPES                                 .......           87,811  .......           87,811  .......           87,811  .......  ...............  .......  ...............

     TANK AMMUNITION
  12 CTG TANK 105MM AND 120MM: ALL TYPES                      .......          112,380  .......          112,380  .......          112,380  .......  ...............  .......  ...............

     ARTILLERY AMMUNITION
  13 CTG, ARTY, 75MM AND 105MM: ALL TYPES                     .......           50,861  .......           50,861  .......           50,861  .......  ...............  .......  ...............
  14 ARTILLERY PROJECTILE, 155MM, ALL TYPES                   .......           26,227  .......           26,227  .......           26,227  .......  ...............  .......  ...............
  15 PROJ 155MM EXTENDED RANGE XM982                          .......          110,329  .......           60,329  .......           15,003  .......          -95,326  .......          -45,326
  16 ARTILLERY PROPELLANTS, FUZES AND PRIMERS, ALL TYPES      .......           43,924  .......           43,924  .......           43,924  .......  ...............  .......  ...............

     MINES
  17 MINES AND CLEARING CHARGE, ALL TYPES                     .......            3,775  .......            3,775  .......            3,775  .......  ...............  .......  ...............

     NETWORKED MUNITIONS
  18 SPIDER NETWORK MUNITIONS, ALL TYPES                      .......           17,408  .......           17,408  .......           17,408  .......  ...............  .......  ...............

     ROCKETS
  19 SHOULDER LAUNCHED MUNITIONS, ALL TYPES                   .......            1,005  .......            1,005  .......            1,005  .......  ...............  .......  ...............
  20 ROCKET, HYDRA 70, ALL TYPES                              .......          123,433  .......          123,433  .......          123,433  .......  ...............  .......  ...............

     OTHER AMMUNITION
  21 DEMOLITION MUNITIONS, ALL TYPES                          .......           35,189  .......           35,189  .......           35,189  .......  ...............  .......  ...............
  22 GRENADES, ALL TYPES                                      .......           33,477  .......           33,477  .......           33,477  .......  ...............  .......  ...............
  23 SIGNALS, ALL TYPES                                       .......            9,991  .......            9,991  .......            9,991  .......  ...............  .......  ...............
  24 SIMULATORS, ALL TYPES                                    .......           10,388  .......           10,388  .......           10,388  .......  ...............  .......  ...............

     MISCELLANEOUS
  25 AMMO COMPONENTS, ALL TYPES                               .......           19,383  .......           19,383  .......           19,383  .......  ...............  .......  ...............
  26 NON-LETHAL AMMUNITION, ALL TYPES                         .......            7,336  .......            7,336  .......            7,336  .......  ...............  .......  ...............
  27 CAD/PAD ALL TYPES                                        .......            6,641  .......            6,641  .......            6,641  .......  ...............  .......  ...............
  28 ITEMS LESS THAN $5 MILLION                               .......           15,092  .......           15,092  .......           15,092  .......  ...............  .......  ...............
  29 AMMUNITION PECULIAR EQUIPMENT                            .......           15,692  .......           15,692  .......           15,692  .......  ...............  .......  ...............
  30 FIRST DESTINATION TRANSPORTATION (AMMO)                  .......           14,107  .......           14,107  .......           14,107  .......  ...............  .......  ...............
  31 CLOSEOUT LIABILITIES                                     .......              106  .......              106  .......              106  .......  ...............  .......  ...............
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, AMMUNITION                                  .......        1,333,697  .......        1,170,759  .......        1,218,371  .......         -115,326  .......          +47,612

     AMMUNITION PRODUCTION BASE SUPPORT

     PRODUCTION BASE SUPPORT
  32 PROVISION OF INDUSTRIAL FACILITIES                       .......          220,171  .......          220,171  .......          220,171  .......  ...............  .......  ...............
  33 CONVENTIONAL MUNITIONS DEMILITARIZATION, ALL             .......          182,461  .......          182,461  .......          182,461  .......  ...............  .......  ...............
  34 ARMS INITIATIVE                                          .......            3,377  .......            3,377  .......            3,377  .......  ...............  .......  ...............
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, AMMUNITION PRODUCTION BASE SUPPORT          .......          406,009  .......          406,009  .......          406,009  .......  ...............  .......
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, PROCUREMENT OF AMMUNITION, ARMY             .......        1,739,706  .......        1,576,768  .......        1,624,380  .......         -115,326  .......          +47,612
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                            2013 budget      Committee      Change from
Line         Item            estimate     recommendation  budget request
------------------------------------------------------------------------
   7Ctg, 30mm, All              72,154          52,154         -20,000
     Types
        Army requested  ..............  ..............         -18,000
         transfer to
         Title IX:
         Aircraft
         Procurement,
         Army Line 13
        Excess          ..............  ..............          -2,000
         nonrecurring
         engineering
  15Proj 155mm                 110,329          15,003         -95,326
     Extended Range
     XM982
        Contract award  ..............  ..............         -95,326
         delays
------------------------------------------------------------------------

    Excalibur XM982.--The Committee notes that the Increment 1b 
Milestone C decision has been delayed 6 months due to a 2010 
Nunn-McCurdy evaluation and technical difficulties during 
design and testing. The Army plans on awarding the first 
production contract for the 1b variant in December 2012 using 
fiscal year 2012 funds. The fiscal year 2013 budget requests 
$95,326,000 to award the second 1b production contract only 6 
months later in June 2013. Under this plan, 82 percent of the 
total planned procurement would be under contract about 6 
months before the delivery of the first production lot and 9 
months before the anticipated full-rate production decision in 
March 2014. The Committee agrees with the Government 
Accountability Office's recommendation to delay the award of 
the second production lot until after the delivery of the 
initial production lot in December 2013 in order to allow more 
time to identify and correct any testing issues before 
significantly ramping up production. Therefore, the Committee 
recommends a reduction of $95,326,000 in the base request and 
$12,300,000 in the OCO request.
    Saboted Light Armor Penetrator Ammunition.--The Committee 
is aware of the Army's decision to end production of M903 and 
M962 armor-penetrating .50 caliber ammunition used during 
combat operations. Within 120 days of enactment of this act, 
the Secretary of the Army shall provide the congressional 
defense committees a report on the health of the U.S. 
industrial base with regard to the production capabilities for 
this highly effective ammunition. This report should include 
analyses of the consequences of a possible production line 
shutdown and effects on second and third tier suppliers.

                        Other Procurement, Army

Appropriations, 2012....................................  $7,924,214,000
Budget estimate, 2013...................................   6,326,245,000
House allowance.........................................   6,488,045,000
Committee recommendation................................   4,980,209,000

    The Committee recommends an appropriation of 
$4,980,209,000. This is $1,346,036,000 below the budget 
estimate.

                     committee recommended program

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                                     [Dollars in thousands]
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                                   Change from                Change from
Line                           Item                             Qty.     2013 budget      Qty.   House allowance    Qty.      Committee    -----------------------------------------------------
                                                                           estimate                                         recommendation    Qty.    Budget estimate    Qty.    House allowance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                    OTHER PROCUREMENT, ARMY

     TACTICAL AND SUPPORT VEHICLES

     TACTICAL VEHICLES
   1 SEMITRAILERS, FLATBED                                       27           $7,097       27           $7,097       27           $7,097  ........  ...............  ........  ...............
   2 FAMILY OF MEDIUM TACTICAL VEH [FMTV]                     1,248          346,115    1,248          346,115    1,248          339,515  ........          -$6,600  ........          -$6,600
   3 FIRETRUCKS & ASSOCIATED FIREFIGHTING EQUIP- MENT       .......           19,292  .......           19,292  .......           19,292  ........  ...............  ........  ...............
   4 FAMILY OF HEAVY TACTICAL VEHICLES [FHTV]                 1,534           52,933    1,534           52,933    1,534           52,933  ........  ...............  ........  ...............
   5 PLS ESP                                                .......           18,035  .......           18,035  .......           18,035  ........  ...............  ........  ...............
   9 TRUCK, TRACTOR, LINE HAUL, M915/M916                        12            3,619       12            3,619       12            3,619  ........  ...............  ........  ...............
  10 HVY EXPANDED MOBILE TACTICAL TRUCK EXT SERV                 60           26,859       60           26,859       60           26,859  ........  ...............  ........  ...............
  12 TACTICAL WHEELED VEHICLE PROTECTION KITS                   950           69,163      950           69,163      950           69,163  ........  ...............  ........  ...............
  13 MODIFICATION OF IN SVC EQUIP                           .......           91,754  .......           91,754  .......           91,754  ........  ...............  ........  ...............

     NON-TACTICAL VEHICLES
  18 PASSENGER CARRYING VEHICLES                            .......            2,548  .......            2,548  .......            2,548  ........  ...............  ........  ...............
  19 NONTACTICAL VEHICLES, OTHER                            .......           16,791  .......           16,791  .......           11,791  ........           -5,000  ........           -5,000
                                                           -------------------------------------------------------------------------------------------------------------------------------------
           TOTAL, TACTICAL AND SUPPORT VEHICLES             .......          654,206  .......          654,206  .......          642,606  ........          -11,600  ........          -11,600

     COMMUNICATIONS AND ELECTRONICS EQUIPMENT

     COMM--JOINT COMMUNICATIONS
  20 JOINT COMBAT IDENTIFICATION MARKING SYSTEM               7,038           10,061    7,038           10,061    7,038            8,961  ........           -1,100  ........           -1,100
  21 WIN-T--GROUND FORCES TACTICAL NETWORK                    2,166          892,635    2,166          892,635    2,166          511,720  ........         -380,915  ........         -380,915
  22 SIGNAL MODERNIZATION PROGRAM                           .......           45,626  .......           45,626  .......           45,626  ........  ...............  ........  ...............
  23 JCSE EQUIPMENT (USREDCOM)                              .......            5,143  .......            5,143  .......            5,143  ........  ...............  ........  ...............

     COMM--SATELLITE COMMUNICATIONS
  24 DEFENSE ENTERPRISE WIDEBAND SATCOM SYSTEMS                  23          151,636       23          151,636       23          151,636  ........  ...............  ........  ...............
  25 TRANSPORTABLE TACTICAL COMMAND COMMUNICATIONS          .......            6,822  .......            6,822  .......  ...............  ........           -6,822  ........           -6,822
  26 SHF TERM                                               .......            9,108  .......            9,108  .......            9,108  ........  ...............  ........  ...............
  28 NAVSTAR GLOBAL POSITIONING SYSTEM (SPACE)                3,592           27,353    3,592           27,353  .......            8,453    -3,952          -18,900    -3,592          -18,900
  29 SMART-T (SPACE)                                        .......           98,656  .......           98,656  .......           14,040  ........          -84,616  ........          -84,616
  31 GLOBAL BRDCST SVC--GBS                                 .......           47,131  .......           47,131  .......           47,131  ........  ...............  ........  ...............
  32 MOD OF IN-SVC EQUIP (TAC SAT)                               39           23,281       39           23,281       39           23,281  ........  ...............  ........  ...............

     COMM--C3 SYSTEM
  34 ARMY GLOBAL CMD & CONTROL SYS [AGCCS]                  .......           10,848  .......           10,848  .......           10,848  ........  ...............  ........  ...............

     COMM--COMBAT COMMUNICATIONS
  35 ARMY DATA DISTRIBUTION SYSTEM (DATA RADIO)             .......              979  .......              979  .......              979  ........  ...............  ........  ...............
  36 JOINT TACTICAL RADIO SYSTEM                             11,059          556,250   11,059          556,250    8,765          366,250    -2,294         -190,000    -2,294         -190,000
  37 MID-TIER NETWORKING VEHICULAR RADIO [MNVR]             .......           86,219  .......           86,219  .......           86,219  ........  ...............  ........  ...............
  38 RADIO TERMINAL SET, MIDS LVT(2)                        .......            7,798  .......            7,798  .......            7,798  ........  ...............  ........  ...............
  39 SINCGARS FAMILY                                        .......            9,001  .......            9,001  .......            9,001  ........  ...............  ........  ...............
  40 AMC CRITICAL ITEMS--OPA2                                   108           24,601      108           24,601      108           24,601  ........  ...............  ........  ...............
  41 TRACTOR DESK                                           .......            7,779  .......            7,779  .......            2,579  ........           -5,200  ........           -5,200
  43 SPIDER APLA REMOTE CONTROL UNIT                        .......           34,365  .......           24,365  .......           34,365  ........  ...............  ........          +10,000
  44 SOLDIER ENHANCEMENT PROGRAM COMM/ELECTRONICS           .......            1,833  .......            1,833  .......  ...............  ........           -1,833  ........           -1,833
  45 TACTICAL COMMUNICATIONS AND PROTECTIVE SYS- TEM        .......           12,984  .......           12,984  .......           12,984  ........  ...............  ........  ...............
  47 GUNSHOT DETECTION SYSTEM [GDS]                              46            2,332       46            2,332  .......  ...............       -46           -2,332       -46           -2,332
  48 RADIO, IMPROVED HF (COTS) FAMILY                       .......            1,132  .......            1,132  .......            1,132  ........  ...............  ........  ...............
  49 MEDICAL COMM FOR CBT CASUALTY CARE [MC4]                 2,535           22,899    2,535           22,899    2,535           22,899  ........  ...............  ........  ...............

     COMM--INTELLIGENCE COMM
  51 CI AUTOMATION ARCHITECTURE (MIP)                       .......            1,564  .......            1,564  .......            1,564  ........  ...............  ........  ...............
  52 RESERVE CA/MISO GPF EQUIPMENT                          .......           28,781  .......           28,781  .......           28,781  ........  ...............  ........  ...............

     INFORMATION SECURITY
  53 TSEC--ARMY KEY MGT SYS [AKMS]                            6,087           23,432    6,087           23,432    6,087           23,432  ........  ...............  ........  ...............
  54 INFORMATION SYSTEM SECURITY PROGRAM--ISSP                2,469           43,897    2,469           43,897    2,469           43,897  ........  ...............  ........  ...............

     COMM--LONG HAUL COMMUNICATIONS
  56 TERRESTRIAL TRANSMISSION                               .......            2,891  .......            2,891  .......            2,891  ........  ...............  ........  ...............
  57 BASE SUPPORT COMMUNICATIONS                            .......           13,872  .......           13,872  .......           13,872  ........  ...............  ........  ...............
  58 WW TECH CON IMP PROG [WWTCIP]                          .......            9,595  .......            9,595  .......            9,595  ........  ...............  ........  ...............

     COMM--BASE COMMUNICATIONS
  59 INFORMATION SYSTEMS                                        164          142,133      164          142,133      164          131,133  ........          -11,000  ........          -11,000
  61 INSTALLATION INFO INFRASTRUCTURE MOD PRO- GRAM         .......           57,727  .......           57,727  .......           57,727  ........  ...............  ........  ...............
  62 PENTAGON INFORMATION MGT AND TELECOM                   .......            5,000  .......            5,000  .......            5,000  ........  ...............  ........  ...............

     ELECT EQUIP

     ELECT EQUIP--TACT INT REL ACT [TIARA]
  65 JTT/CIBS-M (MIP)                                       .......            1,641  .......            1,641  .......            1,641  ........  ...............  ........  ...............
  66 PROPHET GROUND (MIP)                                        13           48,797       13           48,797       13           48,797  ........  ...............  ........  ...............
  69 DCGS-A (MIP)                                             1,743          184,007    1,743          184,007  .......  ...............    -1,743         -184,007    -1,743         -184,007
  70 JOINT TACTICAL GROUND STATION [JTAGS]                        5            2,680        5            2,680        5            2,680  ........  ...............  ........  ...............
  71 TROJAN (MIP)                                           .......           21,483  .......           21,483  .......           21,483  ........  ...............  ........  ...............
  72 MOD OF IN-SVC EQUIP (INTEL SPT) (MIP)                  .......            2,412  .......            2,412  .......            2,412  ........  ...............  ........  ...............
  73 CI HUMINT AUTO REPRTING AND COLL [CHARCS]  (MIP)       .......            7,077  .......            7,077  .......            7,077  ........  ...............  ........  ...............

     ELECT EQUIP--ELECTRONIC WARFARE [EW]
  75 LIGHTWEIGHT COUNTER MORTAR RADAR                            43           72,594       43           72,594       43           72,594  ........  ...............  ........  ...............
  76 CREW                                                   .......           15,446  .......           15,446  .......           15,446  ........  ...............  ........  ...............
  78 COUNTERINTELLIGENCE/SECURITY COUNTERMEAS- URES         .......            1,470  .......            1,470  .......            1,470  ........  ...............  ........  ...............
  79 CI MODERNIZATION (MIP)                                 .......            1,368  .......            1,368  .......            1,368  ........  ...............  ........  ...............

     ELECT EQUIP--TACTICAL SURV [TAC SURV]
  80 FAAD GBS                                               .......            7,980  .......            7,980  .......            7,980  ........  ...............  ........  ...............
  81 SENTINEL MODS                                               70           33,444       70           33,444       70           33,444  ........  ...............  ........  ...............
  82 SENSE THROUGH THE WALL [STTW]                          .......            6,212  .......            6,212  .......  ...............  ........           -6,212  ........           -6,212
  83 NIGHT VISION DEVICES                                     8,687          166,516    8,687          166,516    8,687          139,516  ........          -27,000  ........          -27,000
  85 NIGHT VISION, THERMAL WPN SIGHT                        .......           82,162  .......           82,162  .......           82,162  ........  ...............  ........  ...............
  86 SMALL TACTICAL OPTICAL RIFLE MOUNTED MLRF              .......           20,717  .......           20,717  .......           20,717  ........  ...............  ........  ...............
  89 GREEN LASER INTERDICTION SYSTEM                        .......            1,014  .......            1,014  .......            1,014  ........  ...............  ........  ...............
  90 INDIRECT FIRE PROTECTION FAMILY OF SYSTEMS             .......           29,881  .......           29,881  .......           24,881  ........           -5,000  ........           -5,000
  91 PROFILER                                                   136           12,482      136           12,482      136           12,482  ........  ...............  ........  ...............
  92 MOD OF IN-SVC EQUIP (FIREFINDER RADARS)                .......            3,075  .......            3,075  .......            3,075  ........  ...............  ........  ...............
  94 JOINT BATTLE COMMAND--PLATFORM [JBC-P]                 .......          141,385  .......          141,385  .......          141,385  ........  ...............  ........  ...............
  96 MOD OF IN-SERVICE EQUIPMENT (LLDR)                     .......           22,403  .......           42,203  .......           88,403  ........          +66,000  ........          +46,200
  98 MORTAR FIRE CONTROL SYSTEM                             .......           29,505  .......           29,505  .......           21,705  ........           -7,800  ........           -7,800
  99 COUNTERFIRE RADARS                                          13          244,409       13          244,409  .......  ...............       -13         -244,409       -13         -244,409
 100 ENHANCED SENSOR & MONITORING SYSTEM                    .......            2,426  .......            2,426  .......            2,426  ........  ...............  ........  ...............

     ELECT EQUIP--TACTICAL C2 SYSTEMS
 101 TACTICAL OPERATIONS CENTERS                                133           30,196      133           30,196      133           30,196  ........  ...............  ........  ...............
 102 FIRE SUPPORT C2 FAMILY                                   1,642           58,903    1,642           58,903    1,642           58,903  ........  ...............  ........  ...............
 103 BATTLE COMMAND SUSTAINMENT SUPPORT SYSTEM                  445            8,111      445            8,111      445            8,111  ........  ...............  ........  ...............
 104 FAAD C2                                                .......            5,031  .......            5,031  .......            5,031  ........  ...............  ........  ...............
 105 AIR & MSL DEFENSE PLANNING & CONTROL SYS  [AMD]             12           64,144       12           64,144       12           64,144  ........  ...............  ........  ...............
 106 KNIGHT FAMILY                                          .......           11,999  .......           11,999  .......           11,999  ........  ...............  ........  ...............
 107 LIFE CYCLE SOFTWARE SUPPORT [LCSS]                     .......            1,853  .......            1,853  .......            1,853  ........  ...............  ........  ...............
 108 AUTOMATIC IDENTIFICATION TECHNOLOGY                    .......           14,377  .......           14,377  .......           14,377  ........  ...............  ........  ...............
 111 NETWORK MANAGEMENT INITIALIZATION AND SERV- ICE        .......           59,821  .......           59,821  .......  ...............  ........          -59,821  ........          -59,821
 112 MANEUVER CONTROL SYSTEM [MCS]                              721           51,228      721           51,228      721           51,228  ........  ...............  ........  ...............
 113 SINGLE ARMY LOGISTICS ENTERPRISE [SALE]                  5,976          176,901    5,976          176,901    5,976          176,901  ........  ...............  ........  ...............
 114 RECONNAISSANCE AND SURVEYING INSTRUMENT  SET           .......           15,209  .......           15,209  .......           15,209  ........  ...............  ........  ...............

     ELECT EQUIP--AUTOMATION
 115 ARMY TRAINING MODERNIZATION                            .......            8,866  .......            8,866  .......            8,866  ........  ...............  ........  ...............
 116 AUTOMATED DATA PROCESSING EQUIPMENT                    .......          129,438  .......          129,438  .......          129,438  ........  ...............  ........  ...............
 117 GENERAL FUND ENTERPRISE BUSINESS SYSTEM                .......            9,184  .......            9,184  .......            9,184  ........  ...............  ........  ...............
 118 CSS COMMUNICATIONS                                       2,062           20,639    2,062           20,639    2,062           20,639  ........  ...............  ........  ...............
 119 RESERVE COMPONENT AUTOMATION SYS [RCAS]                .......           35,493  .......           35,493  .......           35,493  ........  ...............  ........  ...............

     ELECT EQUIP--AUDIO VISUAL SYS (A/V)
 120 ITEMS LESS THAN $5.0M (A/V)                            .......            8,467  .......            8,467  .......            8,467  ........  ...............  ........  ...............
 121 ITEMS LESS THAN $5M (SURVEYING EQUIPMENT)                   89            5,309       89            5,309       89            5,309  ........  ...............  ........  ...............

     ELECT EQUIP--SUPPORT
 122 PRODUCTION BASE SUPPORT (C-E)                          .......              586  .......              586  .......              586  ........  ...............  ........  ...............
                                                           -------------------------------------------------------------------------------------------------------------------------------------
           TOTAL, COMMUNICATIONS AND ELECTRONICS EQUIPMENT  .......        4,303,705  .......        4,313,505  .......        3,132,738  ........       -1,170,967  ........       -1,180,767

     OTHER SUPPORT EQUIPMENT

     CHEMICAL DEFENSIVE EQUIPMENT
 126 FAMILY OF NON-LETHAL EQUIPMENT [FNLE]                    1,562            3,960    1,562            3,960  .......  ...............    -1,562           -3,960    -1,562           -3,960
 127 BASE DEFENSE SYSTEMS [BDS]                                 637            4,374      637            4,374      637            4,374  ........  ...............  ........  ...............
 128 CBRN SOLDIER PROTECTION                                    219            9,259      219            9,259      219            9,259  ........  ...............  ........  ...............

     BRIDGING EQUIPMENT
 130 TACTICAL BRIDGING                                            7           35,499        7           35,499  .......            2,961        -7          -32,538        -7          -32,538
 131 TACTICAL BRIDGE, FLOAT-RIBBON                               68           32,893       68           32,893       46           20,843       -22          -12,050       -22          -12,050
 134 ROBOTIC COMBAT SUPPORT SYSTEM                          .......           29,106  .......           29,106  .......  ...............  ........          -29,106  ........          -29,106
 135 EXPLOSIVE ORDNANCE DISPOSAL EQPMT [EOD  EQPMT]             522           25,459      522           25,459      522           25,459  ........  ...............  ........  ...............
 136 REMOTE DEMOLITION SYSTEMS                                  364            8,044      364            8,044      364            8,044  ........  ...............  ........  ...............
 137 ITEMS LESS THAN $5M, COUNTERMINE EQUIPMENT             .......            3,698  .......            3,698  .......            3,698  ........  ...............  ........  ...............

     COMBAT SERVICE SUPPORT EQUIPMENT
 138 HEATERS AND ECU'S                                        1,332           12,210    1,332           12,210  .......  ...............    -1,332          -12,210    -1,332          -12,210
 139 SOLDIER ENHANCEMENT                                    .......            6,522  .......            6,522  .......            6,522  ........  ...............  ........  ...............
 140 PERSONNEL RECOVERY SUPPORT SYSTEM [PRSS]               .......           11,222  .......           11,222  .......           11,222  ........  ...............  ........  ...............
 141 GROUND SOLDIER SYSTEM                                    5,226          103,317    5,226          103,317    4,181           83,317    -1,045          -20,000    -1,045          -20,000
 143 FIELD FEEDING EQUIPMENT                                  8,891           27,417    8,891           27,417    8,891           27,417  ........  ...............  ........  ...............
 145 CARGO AERIAL DEL & PERSONNEL PARACHUTE SYSTEM          .......           52,065  .......           52,065  .......           52,065  ........  ...............  ........  ...............
 146 MORTUARY AFFAIRS SYSTEMS                               .......            2,358  .......            2,358  .......            2,358  ........  ...............  ........  ...............
 147 FAMILY OF ENGR COMBAT AND CONSTRUCTION SETS                266           31,573      266           31,573      266           31,573  ........  ...............  ........  ...............
 148 ITEMS LESS THAN $5M (ENG SPT)                              818           14,093      818           14,093      818           14,093  ........  ...............  ........  ...............

     PETROLEUM EQUIPMENT
 149 DISTRIBUTION SYSTEMS, PETROLEUM & WATER                    208           36,266      208           36,266      208           36,266  ........  ...............  ........  ...............

     MEDICAL EQUIPMENT
 150 COMBAT SUPPORT MEDICAL                                   1,938           34,101    1,938           34,101    1,938           34,101  ........  ...............  ........  ...............
 151 MEDEVAC MISSION EQUIPMENT PACKAGE [MEP]                .......           20,540  .......           20,540  .......           20,540  ........  ...............  ........  ...............

     MAINTENANCE EQUIPMENT
 152 MOBILE MAINTENANCE EQUIPMENT SYSTEMS                        20            2,495       20            2,495       20            2,495  ........  ...............  ........  ...............

     CONSTRUCTION EQUIPMENT
 154 GRADER, ROAD MTZD, HVY, 6X4 (CCE)                      .......            2,028  .......            2,028  .......            2,028  ........  ...............  ........  ...............
 156 SCRAPERS,

     EARTHMOVING                                                  9            6,146        9            6,146        9            6,146  ........  ...............  ........  ...............
 157 MISSION MODULES--ENGINEERING                                40           31,200       40           31,200       40           31,200  ........  ...............  ........  ...............
 161 TRACTOR, FULL TRACKED                                       61           20,867       61           20,867       61           20,867  ........  ...............  ........  ...............
 162 ALL TERRAIN CRANES                                           1            4,003        1            4,003        1            2,503  ........           -1,500  ........           -1,500
 163 PLANT, ASPHALT MIXING                                        1            3,679        1            3,679        1            3,679  ........  ...............  ........  ...............
 164 HIGH MOBILITY ENGINEER EXCAVATOR [HMEE] FOS                 76           30,042       76           30,042       76           30,042  ........  ...............  ........  ...............
 165 ENHANCED RAPID AIRFIELD CONSTRUCTION                       182           13,725      182           13,725  .......  ...............      -182          -13,725      -182          -13,725
 166 CONST EQUIP ESP                                             47           13,351       47           13,351       47           11,351  ........           -2,000  ........           -2,000
 167 ITEMS LESS THAN $5.0M (CONST EQUIP)                    .......            9,134  .......            9,134  .......            9,134  ........  ...............  ........  ...............

     RAIL FLOAT CONTAINERIZATION EQUIPMENT
 170 ITEMS LESS THAN $5.0M (FLOAT/RAIL)                     .......           10,552  .......           10,552  .......           10,552  ........  ...............  ........  ...............

     GENERATORS
 171 GENERATORS AND ASSOCIATED EQUIPMENT                      2,074           60,302    2,074           60,302  .......  ...............    -2,074          -60,302    -2,074          -60,302

     MATERIAL HANDLING EQUIPMENT
 173 FAMILY OF FORKLIFTS                                         64            5,895       64            5,895       64            5,895  ........  ...............  ........  ...............

     TRAINING EQUIPMENT
 175 COMBAT TRAINING CENTERS SUPPORT                            339          104,649      339          104,649      339          104,649  ........  ...............  ........  ...............
 176 TRAINING DEVICES, NONSYSTEM                            .......          125,251  .......          125,251  .......          119,251  ........           -6,000  ........           -6,000
 177 CLOSE COMBAT TACTICAL TRAINER                                8           19,984        8           19,984        8           19,984  ........  ...............  ........  ...............
 178 AVIATION COMBINED ARMS TACTICAL TRAINER  [AVCA]        .......           10,977  .......           10,977  .......           10,977  ........  ...............  ........  ...............
 179 GAMING TECHNOLOGY IN SUPPORT OF ARMY TRAIN- ING        .......            4,056  .......            4,056  .......            4,056  ........  ...............  ........  ...............

     TEST MEASURE AND DIG EQUIPMENT [TMD]
 180 CALIBRATION SETS EQUIPMENT                                   3           10,494        3           10,494        3           10,494  ........  ...............  ........  ...............
 181 INTEGRATED FAMILY OF TEST EQUIPMENT [IFTE]               1,674           45,508    1,674           45,508    1,674           45,508  ........  ...............  ........  ...............
 182 TEST EQUIPMENT MODERNIZATION [TEMOD]                     2,786           24,334    2,786           24,334    2,786           39,334  ........          +15,000  ........          +15,000

     OTHER SUPPORT EQUIPMENT
 183 RAPID EQUIPPING SOLDIER SUPPORT EQUIPMENT              .......            5,078  .......            5,078  .......  ...............  ........           -5,078  ........           -5,078
 184 PHYSICAL SECURITY SYSTEMS (OPA3)                       .......           46,301  .......           46,301  .......           46,301  ........  ...............  ........  ...............
 185 BASE LEVEL COM'L EQUIPMENT                             .......            1,373  .......            1,373  .......            1,373  ........  ...............  ........  ...............
 186 MODIFICATION OF IN-SVC EQUIPMENT (OPA-3)                   248           59,141      248           59,141      248           59,141  ........  ...............  ........  ...............
 187 PRODUCTION BASE SUPPORT (OTH)                          .......            2,446  .......            2,446  .......            2,446  ........  ...............  ........  ...............
 188 SPECIAL EQUIPMENT FOR USER TESTING                         206           12,920      206           12,920      206           12,920  ........  ...............  ........  ...............
 189 AMC CRITICAL ITEMS OPA3                                  1,141           19,180    1,141           19,180    1,141           19,180  ........  ...............  ........  ...............
 190 TRACTOR YARD                                           .......            7,368  .......            7,368  .......            2,368  ........           -5,000  ........           -5,000
 191 BCT UNMANNED GROUND VEHICLE                                311           83,937      311           83,937       76           31,937      -235          -52,000      -235          -52,000
                                                           -------------------------------------------------------------------------------------------------------------------------------------
           TOTAL, OTHER SUPPORT EQUIPMENT                   .......        1,300,392  .......        1,300,392  .......        1,059,923  ........         -240,469  ........         -240,469

     SPARE AND REPAIR PARTS
 193 INITIAL SPARES--C&E                                         34           64,507       34           64,507       34           64,507  ........  ...............  ........  ...............
                                                           -------------------------------------------------------------------------------------------------------------------------------------
           TOTAL, SPARE AND REPAIR PARTS                    .......           64,507  .......           64,507  .......           64,507  ........  ...............  ........

     CLASSIFIED PROGRAMS                                    .......            3,435  .......            3,435  .......            3,435  ........  ...............  ........  ...............
     EMERGENCY MANAGEMENT MODERNIZATION PRO- GRAM           .......  ...............  .......           52,000  .......           52,000  ........          +52,000  ........  ...............
     NON-DEVELOPMENTAL EMERGING TECHNOLOGIES                .......  ...............  .......  ...............  .......           25,000  ........          +25,000  ........          +25,000
     ARMY NATIONAL GUARD HMMWV MODERNIZATION PROGRAM        .......  ...............  .......          100,000  .......  ...............  ........  ...............  ........         -100,000
                                                           -------------------------------------------------------------------------------------------------------------------------------------
           TOTAL, OTHER PROCUREMENT, ARMY                   .......        6,326,245  .......        6,488,045  .......        4,980,209  ........       -1,346,036  ........       -1,507,836
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                           2013 budget      Committee      Change from
Line         Item           estimate     recommendation  budget estimate
------------------------------------------------------------------------
   2Family of Medium          346,115         339,515          -6,600
     Tactical Vehicle
     [FMTV]
        Medium         ..............  ..............          -6,600
         Tactical
         Vehicle
         Family
         support cost
         growth
  19Nontactical                16,791          11,791          -5,000
     Vehicles, Other
        Unobligated    ..............  ..............          -5,000
         balances
  20Joint Combat               10,061           8,961          -1,100
     Identification
     Marking System
        Unobligated    ..............  ..............          -1,100
         balances
  21Win-T--Ground             892,635         511,720        -380,915
     Forces Tactical
     Network
        Increment 1    ..............  ..............         -34,100
         support cost
         growth
        Increment 2    ..............  ..............        -346,815
         contract
         award delay
  25Transportable               6,822  ..............          -6,822
     Tactical Command
     Communications
        Early to need  ..............  ..............          -6,822
  28Navstar Global             27,353           8,453         -18,900
     Positioning
     System (SPACE)
        Contract       ..............  ..............         -18,900
         Award Delay
  29Smart-T (SPACE)            98,656          14,040         -84,616
        Army reduced   ..............  ..............         -84,616
         requirement
  36Joint Tactical            556,250         366,250        -190,000
     Radio System
        Contract       ..............  ..............        -190,000
         award delay--
         Manpack
  41TRACTOR DESK                7,779           2,579          -5,200
        Excess to      ..............  ..............          -5,200
         need
  44Soldier                     1,833  ..............          -1,833
     Enhancement
     Program Comm/
     Electronics
        Unobligated    ..............  ..............          -1,833
         balances
  47Gunshot Detection           2,332  ..............          -2,332
     System [GDS]
        Contract       ..............  ..............          -2,332
         award delay
  59Information               142,133         131,133         -11,000
     Systems
        Unobligated    ..............  ..............         -11,000
         balances
  69DCGS-A [MIP]              184,007  ..............        -184,007
        Transfer to    ..............  ..............        -184,007
         Title IX--
         DCGS-A
  82Sense Through the           6,212  ..............          -6,212
     Wall [STTW]
        Contract       ..............  ..............          -6,212
         award delay
  83Night Vision              166,516         139,516         -27,000
     Devices
        Transfer to    ..............  ..............         -27,000
         Title IX--
         Night Vision
         Devices
  90Indirect Fire              29,881          24,881          -5,000
     Protection
     Family of
     Systems
        Excess to      ..............  ..............          -5,000
         need--traini
         ng
  96Mod of In-Svc              22,403          88,403         +66,000
     Equip [LLDR]
        Light Weight   ..............  ..............         +66,000
         Laser
         Designator/
         Range
         Finder--Army
         identified
         shortfall
  98Mortar Fire                29,505          21,705          -7,800
     Control System
        Program cost   ..............  ..............          -7,800
         growth
  99Counterfire               244,409  ..............        -244,409
     Radars
        Transfer to    ..............  ..............        -244,409
         Title IX--
         Counterfire
         Radars
 111Network                    59,821  ..............         -59,821
     Management
     Initialization
     and Service
        Unjustified    ..............  ..............         -11,900
         unit cost
         growth
        Program        ..............  ..............          -3,000
         support cost
         growth
        Transfer to    ..............  ..............         -44,921
         Title IX--
         Network
         Management
         Initializati
         on and
         Service
 116Automated Data            129,438         129,438  ...............
     Processing Equip
        Army           ..............  ..............         [57,700]
         requested
         internal
         realignment-
         -High
         Performance
         Computing
         Modernizatio
         n Program
 126Family of Non-              3,960  ..............          -3,960
     Lethal Equipment
     [FNLE]
        Stun Device    ..............  ..............          -3,960
         requirement
         met with
         fiscal year
         2012 funding
 130Tactical Bridging          35,499           2,961         -32,538
        Dry Support    ..............  ..............         -32,000
         Bridge
         contract
         award delay
        Line of        ..............  ..............            -538
         Communicatio
         n Bridge
         termination
 131Tactical Bridge,           32,893          20,843         -12,050
     Float-Ribbon
        Propulsion     ..............  ..............         -12,050
         contract
         award delay
 134Robotic Combat             29,106  ..............         -29,106
     Support System
     [RCSS]
        Transfer to    ..............  ..............         -29,106
         Title IX--
         Robotic
         Combat
         Support
         System
         [RCSS]
 138Heaters and ECU'S          12,210  ..............         -12,210
        Transfer to    ..............  ..............         -12,210
         Title IX--
         Heaters and
         ECU'S
 141Ground Soldier            103,317          83,317         -20,000
     System
        Reduce         ..............  ..............         -20,000
         funding by
         two Brigade
         Combat Teams
 162All Terrain                 4,003           2,503          -1,500
     Cranes
        Excessive      ..............  ..............          -1,500
         support
         costs
 165Enhanced Rapid             13,725  ..............         -13,725
     Airfield
     Construction
     Capa
        Excess to      ..............  ..............         -13,725
         need
 166Const Equip Esp            13,351          11,351          -2,000
        Excessive      ..............  ..............          -2,000
         support
         costs
 171Generators and             60,302  ..............         -60,302
     Associated Equip
        Transfer to    ..............  ..............         -60,302
         Title IX--
         Generators
         and
         Associated
         Equipment
 176Training Devices,         125,251         119,251          -6,000
     Nonsystem
        Unobligated    ..............  ..............          -6,000
         balances
 182Test Equipment             24,334          39,334         +15,000
     Modernization
     [TEMOD]
        Test and       ..............  ..............         +15,000
         Training
         Range
         upgrades
 183Rapid Equipping             5,078  ..............          -5,078
     Soldier Support
     Equipment
        Transfer to    ..............  ..............          -5,078
         Title IX--
         Rapid
         Equipping
         Soldier
         Support
         Equipment
 190Tractor Yard                7,368           2,368          -5,000
        Excess to      ..............  ..............          -5,000
         requirement
 191Unmanned Ground            83,937          31,937         -52,000
     Vehicle
        Early to need  ..............  ..............         -52,000
    Emergency          ..............          52,000         +52,000
     Management
     Modernization
     Program
        Army           ..............  ..............         +52,000
         requested
         transfer
         from
         Operation
         and
         Maintenance,
         Army, line
         131--Emergen
         cy
         Management
         Modernizatio
         n Program
    Non-Developmental  ..............          25,000         +25,000
     Emerging
     Technologies
        Army           ..............  ..............         +25,000
         requested
         transfer
         from RDT&E,
         Army line
         169--network
         integration
         exercise
         technology
         transition
------------------------------------------------------------------------

    Budgeting for Sustainable Production Rates.--The Committee 
commends the Army on the continual improvements it has made 
over the past year in its integrated testing of the network 
solution. Over time, the Network Integration Evaluation [NIE] 
will help ensure the Army procures equipment only when it is 
ready and can operate within the network, creating savings in 
time, effort, and hardware costs. To leverage this success, the 
Committee encourages the Army to modify the way it budgets for 
equipment procured after positive performance at the NIE. 
Currently, the Army budgets for network items based on 
``capability sets'', or the number of Brigade Combat Teams 
[BCTs] that will be outfitted with the equipment in a given 
fiscal year. This simplified approach is problematic because 
some equipment within the capability set can be manufactured in 
significantly higher quantities than other equipment in that 
same capability set. Forcing all vendors to produce to a 
certain number of BCTs does not result in the most economical 
unit cost. Additionally, meeting Army quantity demands may 
require some vendors to increase capacity in 1 fiscal year and 
then significantly reduce that capacity the next fiscal year. 
The Committee recommends the Army examine the individual vendor 
production capacity for each network item and plan to procure 
the most economical order quantity and to sustain that quantity 
over a period of time. To better enable congressional oversight 
of budgeting practices, budget justification material submitted 
for fiscal year 2014 should contain the most accurate 
projections of contractor production capacity, lead times, and 
delivery schedules.
    Tactical Wheeled Vehicle Strategy.--The Committee is 
concerned with the impact that recent reductions in Army 
requirements for tactical wheeled vehicles [TWV] will have on 
mission readiness and the TWV industrial base. The Committee 
notes that independently operating brigade combat teams have 
proven effective in the field and that these modular forces 
have increased overall Army requirements for TWV. The Committee 
directs the Army to submit an updated Tactical Wheeled Vehicle 
Strategy to the congressional defense committees not later than 
June 1, 2013. This report should include: (1) Plans for TWV 
procurement, integration, sustainment, and management; (2) 
Fleet size and mix requirements; (3) Allocation plans for reset 
work between organic and private sector components of the TWV 
industrial base; (4) Analysis of the potential impact on the 
TWV industrial base; and (5) Plans for sustaining the TWV 
industrial base.
    Warfighter Integration Network--Tactical [WIN-T].--In 
fiscal year 2012, the Army was appropriated $865,186,000 to 
procure WIN-T increment II units. Due to the Army's decision to 
delay operational testing until May 2012, the contract will not 
be awarded until September 2012. In the fiscal year 2013 
budget, the Army requests $892,635,000 for additional units. 
The Committee is concerned that the Army is too focused on 
equipping capability sets and does not take the vendor's 
production capacity into account when budgeting for this 
program. The funding the Army requested would force the WIN-T 
vendor to hire additional workforce and invest in additional 
production capacity that would not be fiscally sustainable in 
the next budget request. Therefore, the Committee recommends a 
reduction of $346,815,000 to allow the vendor adequate time to 
enhance its production capacity and, subsequently, maintain a 
steady and fiscally sustainable production rate.
    Joint Tactical Radio System [JTRS]--Manpack.--The fiscal 
year 2013 Army budget request contains $287,314,000 for 4,589 
JTRS Manpack units. The Committee notes that the Army has 
$30,348,000 in unobligated fiscal year 2012 funds for 410 Low 
Rate Initial Production [LRIP] units waiting to be put on 
contract. The JTRS Manpack underwent multiservice test and 
evaluation in May 2012 to inform a second LRIP decision later 
in the fiscal year after the test report is issued. The current 
acquisition strategy for this program calls for a second LRIP 
contract award prior to Full Rate Production [FRP]. However, 
the Army's budget request will put them into FRP before the 
program completes testing. Therefore, the Committee recommends 
a reduction of $190,000,000 to provide adequate funds for the 
second LRIP contract award.
    Joint Tactical Radio System [JTRS] Competition.--In an 
effort to ensure the most advanced and most capable technology 
is being deployed to the field, the Committee encourages the 
Department of the Army to leverage commercially available 
technology and competitively award procurement funds to ensure 
that Joint Tactical Radio System [JTRS] certified advanced 
technology can be integrated into the program.

                       Aircraft Procurement, Navy

Appropriations, 2012.................................... $17,675,734,000
Budget estimate, 2013...................................  17,129,296,000
House allowance.........................................  17,518,324,000
Committee recommendation................................  16,936,358,000

    The Committee recommends an appropriation of 
$16,936,358,000. This is $192,938,000 below the budget 
estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                                     [Dollars in thousands]
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                                     Change from               Change from
Line                            Item                              Qty.     2013 budget      Qty.   House allowance    Qty.      Committee    ---------------------------------------------------
                                                                             estimate                                         recommendation    Qty.   Budget estimate    Qty.   House allowance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                    AIRCRAFT PROCUREMENT, NAVY

     COMBAT AIRCRAFT
   1 EA-18G                                                        12       $1,027,443       12         $940,965       12       $1,014,443  .......         -$13,000  .......         +$73,478
   2 EA-18G (AP-CY)                                           .......  ...............  .......           45,000  .......           60,000  .......          +60,000  .......          +15,000
   3 F/A-18E/F (FIGHTER) HORNET (MYP)                              26        2,035,131       37        2,597,565       26        1,976,131  .......          -59,000      -11         -621,434
   4 F/A-18E/F (FIGHTER) HORNET (MYP) (AP-CY)                 .......           30,296  .......           30,296  .......           30,296  .......  ...............  .......  ...............
   5 JOINT STRIKE FIGHTER                                           4        1,007,632        4          965,979        4          988,832  .......          -18,800  .......          +22,853
   6 JOINT STRIKE FIGHTER ADVANCE PROCUREMENT (CY)            .......           65,180  .......           32,590  .......           65,180  .......  ...............  .......          +32,590
   7 JSF STOVL                                                      6        1,404,737        6        1,241,636        6        1,345,937  .......          -58,800  .......         +104,301
   8 JSF STOVL (AP-CY)                                        .......          106,199  .......          106,199  .......          106,199  .......  ...............  .......  ...............
   9 V-22 (MEDIUM LIFT)                                            17        1,303,120       18        1,362,380       17        1,362,120  .......          +59,000       -1             -260
  10 V-22 (MEDIUM LIFT) (AP-CY)                               .......          154,202  .......          154,202  .......          154,202  .......  ...............  .......  ...............
  11 UH-1Y/AH-1Z                                                   27          720,933       29          759,945       27          720,933  .......  ...............       -2          -39,012
  12 UH-1Y/AH-1Z (AP-CY)                                      .......           69,658  .......           69,658  .......           69,658  .......  ...............  .......  ...............
  13 MH-60S (MYP)                                                  18          384,792       18          377,168       18          384,792  .......  ...............  .......           +7,624
  14 MH-60S (MYP) (AP-CY)                                     .......           69,277  .......           69,277  .......           69,277  .......  ...............  .......  ...............
  15 MH-60R                                                        19          656,866       24          826,866       19          656,866  .......  ...............       -5         -170,000
  16 MH-60R (AP-CY)                                           .......          185,896  .......          159,541  .......          185,896  .......  ...............  .......          +26,355
  17 P-8A POSEIDON                                                 13        2,420,755       13        2,387,052       13        2,385,209  .......          -35,546  .......           -1,843
  18 P-8A POSEIDON (ADVANCE PROCUREMENT)                      .......          325,679  .......          325,679  .......          325,679  .......  ...............  .......  ...............
  19 E-2D ADV HAWKEYE                                               5          861,498        5          833,498        5          861,498  .......  ...............  .......          +28,000
  20 E-2D ADV HAWKEYE (AP-CY)                                 .......          123,179  .......          104,179  .......          123,179  .......  ...............  .......          +19,000
  21 C-40A                                                    .......  ...............  .......  ...............        2          158,000       +2         +158,000       +2         +158,000
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, COMBAT AIRCRAFT                             .......       12,952,473  .......       13,389,675  .......       13,044,327  .......          +91,854  .......         -345,348

     TRAINER AIRCRAFT
  22 JPATS                                                         33          278,884       33          249,379       31          247,484       -2          -31,400       -2           -1,895
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, TRAINER AIRCRAFT                            .......          278,884  .......          249,379  .......          247,484  .......          -31,400  .......           -1,895

     OTHER AIRCRAFT
  23 KC-130J                                                  .......            3,000        2          143,000  .......            3,000  .......  ...............       -2         -140,000
  24 KC-130J (AP-CY)                                          .......           22,995  .......           22,995  .......           22,995  .......  ...............  .......  ...............
  25 RQ-4 UAV (AP-CY)                                         .......           51,124  .......           51,124  .......           51,124  .......  ...............  .......  ...............
  26 MQ-8 UAV                                                       6          124,573        6          124,573        6          124,573  .......  ...............  .......  ...............
  27 STUASL0 UAV                                                    5            9,593        5            9,593  .......  ...............       -5           -9,593       -5           -9,593
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, OTHER AIRCRAFT                              .......          208,285  .......          208,285  .......          198,692  .......           -9,593  .......           -9,593

     MODIFICATION OF AIRCRAFT
  28 EA-6 SERIES                                              .......           30,062  .......           30,062  .......           30,062  .......  ...............  .......  ...............
  29 AEA SYSTEMS                                              .......           49,999  .......           45,019  .......           49,799  .......             -200  .......           +4,780
  30 AV-8 SERIES                                              .......           38,703  .......           38,703  .......           38,703  .......  ...............  .......  ...............
  31 ADVERSARY                                                .......            4,289  .......            4,289  .......            4,289  .......  ...............  .......  ...............
  32 F-18 SERIES                                              .......          647,306  .......          610,194  .......          625,906  .......          -21,400  .......          +15,712
  33 H-46 SERIES                                              .......            2,343  .......            2,343  .......            2,343  .......  ...............  .......  ...............
  34 AH-1W SERIES                                             .......            8,721  .......            8,721  .......            8,721  .......  ...............  .......  ...............
  35 H-53 SERIES                                              .......           45,567  .......           42,367  .......           38,067  .......           -7,500  .......           -4,300
  36 SH-60 SERIES                                             .......           83,527  .......           98,392  .......           82,527  .......           -1,000  .......          -15,865
  37 H-1 SERIES                                               .......            6,508  .......            6,508  .......            6,508  .......  ...............  .......  ...............
  38 EP-3 SERIES                                              .......           66,374  .......           66,374  .......           63,474  .......           -2,900  .......           -2,900
  39 P-3 SERIES                                               .......          148,405  .......          138,905  .......          146,645  .......           -1,760  .......           +7,740
  40 E-2 SERIES                                               .......           16,322  .......           16,322  .......           16,322  .......  ...............  .......  ...............
  41 TRAINER A/C SERIES                                       .......           34,284  .......           28,134  .......           34,284  .......  ...............  .......           +6,150
  42 C-2A                                                     .......            4,743  .......            4,743  .......            4,743  .......  ...............  .......  ...............
  43 C-130 SERIES                                             .......           60,302  .......           46,067  .......           60,196  .......             -106  .......          +14,129
  44 FEWSG                                                    .......              670  .......              670  .......              670  .......  ...............  .......  ...............
  45 CARGO/TRANSPORT A/C SERIES                               .......           26,311  .......           15,629  .......           10,011  .......          -16,300  .......           -5,618
  46 E-6 SERIES                                               .......          158,332  .......          153,342  .......          152,732  .......           -5,600  .......             -610
  47 EXECUTIVE HELICOPTERS SERIES                             .......           58,163  .......           58,163  .......           43,163  .......          -15,000  .......          -15,000
  48 SPECIAL PROJECT AIRCRAFT                                 .......           12,421  .......           11,421  .......  ...............  .......          -12,421  .......          -11,421
  49 T-45 SERIES                                              .......           64,488  .......           48,908  .......           59,488  .......           -5,000  .......          +10,580
  50 POWER PLANT CHANGES                                      .......           21,569  .......           21,569  .......           13,569  .......           -8,000  .......           -8,000
  51 JPATS SERIES                                             .......            1,552  .......            1,552  .......            1,552  .......  ...............  .......  ...............
  52 AVIATION LIFE SUPPORT MODS                               .......            2,473  .......            2,473  .......            2,473  .......  ...............  .......  ...............
  53 COMMON ECM EQUIPMENT                                     .......          114,690  .......          112,944  .......           81,835  .......          -32,855  .......          -31,109
  54 COMMON AVIONICS CHANGES                                  .......           96,183  .......           94,783  .......           75,133  .......          -21,050  .......          -19,650
  56 ID SYSTEMS                                               .......           39,846  .......           36,112  .......           39,846  .......  ...............  .......           +3,734
  57 P-8 SERIES                                               .......            5,302  .......            5,302  .......            5,302  .......  ...............  .......  ...............
  58 MAGTF EW FOR AVIATION                                    .......           34,127  .......           34,127  .......           34,127  .......  ...............  .......  ...............
  59 RQ-7 SERIES                                              .......           49,324  .......           49,324  .......  ...............  .......          -49,324  .......          -49,324
  60 V-22 (TILT/ROTOR ACFT) OSPREY                            .......           95,856  .......           91,856  .......           95,856  .......  ...............  .......           +4,000
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, MODIFICATION OF AIRCRAFT                    .......        2,028,762  .......        1,925,318  .......        1,828,346  .......         -200,416  .......          -96,972

     AIRCRAFT SPARES AND REPAIR PARTS
  61 SPARES AND REPAIR PARTS                                  .......        1,166,430  .......        1,119,200  .......        1,166,430  .......  ...............  .......          +47,230

     AIRCRAFT SUPPORT EQUIPMENT AND FACILITIES
  62 COMMON GROUND EQUIPMENT                                  .......          387,195  .......          381,195  .......          387,195  .......  ...............  .......           +6,000
  63 AIRCRAFT INDUSTRIAL FACILITIES                           .......           23,469  .......           21,474  .......           23,469  .......  ...............  .......           +1,995
  64 WAR CONSUMABLES                                          .......           43,383  .......           43,383  .......  ...............  .......          -43,383  .......          -43,383
  65 OTHER PRODUCTION CHARGES                                 .......            3,399  .......            3,399  .......            3,399  .......  ...............  .......  ...............
  66 SPECIAL SUPPORT EQUIPMENT                                .......           32,274  .......           32,274  .......           32,274  .......  ...............  .......  ...............
  67 FIRST DESTINATION TRANSPORTATION                         .......            1,742  .......            1,742  .......            1,742  .......  ...............  .......  ...............
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, AIRCRAFT SUPPORT EQUIPMENT & FACILITIES     .......          491,462  .......          483,467  .......          448,079  .......          -43,383  .......          -35,388
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, AIRCRAFT PROCUREMENT, NAVY                  .......       17,129,296  .......       17,518,324  .......       16,936,358  .......         -192,938  .......         -581,966
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
Line         Item           2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
   1EA-18G                   1,027,443       1,014,443         -13,000
        Engine cost     ..............  ..............         -13,000
         growth
   2EA-18G Advance      ..............          60,000         +60,000
     Procurement
        Advance         ..............  ..............         +60,000
         procurement
         for 15 EA-
         18Gs
   3F/A-18E/F                2,035,131       1,976,131         -59,000
     (Fighter) Hornet
        Engine cost     ..............  ..............         -28,000
         growth
        Engineering     ..............  ..............          -6,000
         Change Order
         excess
         funding
        Non-Recurring   ..............  ..............         -25,000
         cost growth
   5Joint Strike             1,007,632         988,832         -18,800
     Fighter CV
        Excessive       ..............  ..............         -18,800
         weapon system
         unit cost
         increase
   7JSF STOVL                1,404,737       1,345,937         -58,800
        Excessive       ..............  ..............         -58,800
         weapon system
         unit cost
         increase
   9V-22 (Medium Lift)       1,303,120       1,362,120         +59,000
        Flyaway unit    ..............  ..............         -12,000
         cost savings
        Replace         ..............  ..............         +71,000
         operational
         loss
  17P-8A Poseidon            2,420,755       2,385,209         -35,546
        Excess to need  ..............  ..............         -35,546
  21C-40A               ..............         158,000        +158,000
        2 C-40          ..............  ..............        +158,000
         aircraft to
         fund Navy
         Reserve
         shortfall
  22JPATS                      278,884         247,484         -31,400
        Reduce 2        ..............  ..............         -15,300
         aircraft
        Airframe cost   ..............  ..............         -10,100
         growth
        Engineering     ..............  ..............          -6,000
         Change Order
         excess
         funding
  27STUASL0 UAV                  9,593  ..............          -9,593
        Program         ..............  ..............          -9,593
         Decrease
  29AEA Systems                 49,999          49,799            -200
        Airborne        ..............  ..............            -200
         Electronic
         Attack
         Expendable
         early to need
  32F-18 Series                647,306         625,906         -21,400
        Correction of   ..............  ..............          -7,000
         Operational
         Discrepancies
         integrated
         logistics
         support cost
         growth
        Core Avionics   ..............  ..............         -10,000
         Improvements
         installation
         equipment non-
         recurring
         engineering
         unjustified
         cost
        Other Support   ..............  ..............          -4,400
         cost growth
  35H-53 Series                 45,567          38,067          -7,500
        Other Support   ..............  ..............          -7,500
         cost growth
  36SH-60 Series                83,527          82,527          -1,000
        Other Support   ..............  ..............          -1,000
         cost growth
  38EP-3 Series                 66,374          63,474          -2,900
        Quick Reaction  ..............  ..............          -1,000
         Capability
         unjustified
         request
        Other Support   ..............  ..............          -1,900
         cost growth
  39P-3 Series                 148,405         146,645          -1,760
        Special         ..............  ..............          -1,760
         Structural
         Inspection
         Kits
         installation
         cost  growth
  43C-130 Series                60,302          60,196            -106
        C-130J          ..............  ..............            -106
         Communication
         Navigation
         Surveillance/
         Air Traffic
         Management
         Integrated
         Logistics
         Support
         excess to
         need
  45Cargo/Transport A/          26,311          10,011         -16,300
     C Series
        Unobligated     ..............  ..............          -6,300
         balances
        Transfer to     ..............  ..............         -10,000
         Title IX--
         Cargo/
         Transport
         Aircraft
         Series
  46E-6 Series                 158,332         152,732          -5,600
        Tech Insertion  ..............  ..............          -2,600
         Other Support
         cost growth
        Service Life    ..............  ..............          -3,000
         Extension
         Program
         installation
         cost growth
  47Executive                   58,163          43,163         -15,000
     Helicopters
     Series
        VH-3D Cockpit   ..............  ..............         -15,000
         Upgrade Non-
         Recurring
         Engineering
         contract
         delay
  48Special Project             12,421  ..............         -12,421
     Aircraft
        Transfer to     ..............  ..............         -12,421
         Title IX--
         Special
         Project
         Aircraft
  49T-45 Series                 64,488          59,488          -5,000
        Avionics        ..............  ..............          -2,000
         Obsolescence
         kit cost
         growth
        Synthetic       ..............  ..............          -3,000
         Radar kit
         cost growth
  50Power Plant                 21,569          13,569          -8,000
     Changes
        Unobligated     ..............  ..............          -8,000
         balances
  53Common ECM                 114,690          81,835         -32,855
     Equipment
        Transfer to     ..............  ..............         -32,855
         Title IX--
         Directed
         Infrared
         Countermeasur
         es
  54Common Avionics             96,183          75,133         -21,050
     Changes
        Prior year      ..............  ..............          -2,200
         funding
         withhold
         available
        Transfer to     ..............  ..............         -18,850
         Title IX--
         Blue Force
         Situational
         Awareness
  59RQ-7 Series                 49,324  ..............         -49,324
        Transfer to     ..............  ..............         -49,324
         Title IX--
         Retrofits
  64War Consumables             43,383  ..............         -43,383
        Transfer to     ..............  ..............         -43,383
         Title IX--War
         Consumables
------------------------------------------------------------------------

                       Weapons Procurement, Navy

Appropriations, 2012....................................  $3,224,432,000
Budget estimate, 2013...................................   3,117,578,000
House allowance.........................................   3,072,112,000
Committee recommendation................................   3,066,919,000

    The Committee recommends an appropriation of 
$3,066,919,000. This is $50,659,000 below the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                                     [Dollars in thousands]
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                                     Change from               Change from
Line                            Item                              Qty.     2013 budget      Qty.   House allowance    Qty.      Committee    ---------------------------------------------------
                                                                             estimate                                         recommendation    Qty.   Budget estimate    Qty.   House allowance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                    WEAPONS PROCUREMENT, NAVY

     BALLISTIC MISSILES

     MODIFICATION OF MISSILES
   1 TRIDENT II MODS                                          .......       $1,224,683  .......       $1,202,583  .......       $1,211,983  .......         -$12,700  .......          +$9,400

     SUPPORT EQUIPMENT AND FACILITIES
   2 MISSILE INDUSTRIAL FACILITIES                            .......            5,553  .......            5,553  .......            5,553  .......  ...............  .......  ...............
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, BALLISTIC MISSILES                          .......        1,230,236  .......        1,208,136  .......        1,217,536  .......          -12,700  .......           +9,400

     OTHER MISSILES

     STRATEGIC MISSILES
   3 TOMAHAWK                                                     196          308,970      196          293,970      196          298,970  .......          -10,000  .......           +5,000

     TACTICAL MISSILES
   4 AMRAAM                                                        67          102,683      161           97,390       67           92,359  .......          -10,324      -94           -5,031
   5 SIDEWINDER                                                   150           80,226      132           74,267      150           74,267  .......           -5,959      +18  ...............
   6 JSOW                                                         280          127,609      266          127,609      280          127,609  .......  ...............      +14  ...............
   7 STANDARD MISSILE                                              94          399,482       89          371,582       89          381,762       -5          -17,720  .......          +10,180
   8 RAM                                                           62           66,769       61           65,769       62           66,769  .......  ...............       +1           +1,000
   9 HELLFIRE                                                     998           74,501      281           74,501      998           74,501  .......  ...............     +717  ...............
  11 AERIAL TARGETS                                           .......           61,518  .......           61,518  .......           59,862  .......           -1,656  .......           -1,656
  12 OTHER MISSILE SUPPORT                                    .......            3,585  .......            3,585  .......            3,585  .......  ...............  .......  ...............

     MODIFICATION OF MISSILES
  13 ESSM                                                          37           58,194       37           53,694       37           58,194  .......  ...............  .......           +4,500
  14 HARM MODS                                                    100           86,721      100           86,721      100           86,721  .......  ...............  .......  ...............

     SUPPORT EQUIPMENT AND FACILITIES
  16 WEAPONS INDUSTRIAL FACILITIES                            .......            2,014  .......            2,014  .......            2,014  .......  ...............  .......  ...............
  17 FLEET SATELLITE COMM FOLLOW-ON                           .......           21,454  .......           21,454  .......           21,454  .......  ...............  .......  ...............

     ORDNANCE SUPPORT EQUIPMENT
  18 ORDNANCE SUPPORT EQUIPMENT                               .......           54,945  .......           54,945  .......           54,945  .......  ...............  .......  ...............
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, OTHER MISSILES                              .......        1,448,671  .......        1,389,019  .......        1,403,012  .......          -45,659  .......          +13,993

     TORPEDOES AND RELATED EQUIPMENT

     TORPEDOES AND RELATED EQUIP
  19 SSTD                                                     .......            2,700  .......            2,700  .......            2,700  .......  ...............  .......  ...............
  20 ASW TARGETS                                              .......           10,385  .......           10,385  .......           10,385  .......  ...............  .......  ...............

     MOD OF TORPEDOES AND RELATED EQUIP
  21 MK-46 TORPEDO MODS                                            75           74,487       75           73,487       75           74,487  .......  ...............  .......           +1,000
  22 MK-48 TORPEDO ADCAP MODS                                      94           54,281       94           48,833       94           54,281  .......  ...............  .......           +5,448
  23 QUICKSTRIKE MINE                                         .......            6,852  .......            6,852  .......            6,852  .......  ...............  .......  ...............

     SUPPORT EQUIPMENT
  24 TORPEDO SUPPORT EQUIPMENT                                .......           46,402  .......           46,402  .......           46,402  .......  ...............  .......  ...............
  25 ASW RANGE SUPPORT                                        .......           11,927  .......            9,327  .......           11,927  .......  ...............  .......           +2,600

     DESTINATION TRANSPORTATION
  26 FIRST DESTINATION TRANSPORTATION                         .......            3,614  .......            3,614  .......            3,614  .......  ...............  .......  ...............
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, TORPEDOES AND RELATED EQUIPMENT             .......          210,648  .......          201,600  .......          210,648  .......  ...............  .......           +9,048

     OTHER WEAPONS

     GUNS AND GUN MOUNTS
  27 SMALL ARMS AND WEAPONS                                   .......           12,594  .......           12,594  .......           12,594  .......  ...............  .......  ...............

     MODIFICATION OF GUNS AND GUN MOUNTS
  28 CIWS MODS                                                .......           59,303  .......           57,303  .......           67,003  .......           +7,700  .......           +9,700
  29 COAST GUARD WEAPONS                                      .......           19,072  .......           13,216  .......           19,072  .......  ...............  .......           +5,856
  30 GUN MOUNT MODS                                           .......           54,706  .......           54,706  .......           54,706  .......  ...............  .......  ...............
  31 CRUISER MODERNIZATION WEAPONS                            .......            1,591  .......           54,781  .......            1,591  .......  ...............  .......          -53,190
  32 AIRBORNE MINE NEUTRALIZATION SYSTEMS                     .......           20,607  .......           20,607  .......           20,607  .......  ...............  .......  ...............
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, OTHER WEAPONS                               .......          167,873  .......          213,207  .......          175,573  .......           +7,700  .......          -37,634

  34 SPARES AND REPAIR PARTS                                  .......           60,150  .......           60,150  .......           60,150  .......  ...............  .......  ...............
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, WEAPONS PROCUREMENT, NAVY                   .......        3,117,578  .......        3,072,112  .......        3,066,919  .......          -50,659  .......           -5,193
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                            2013 budget      Committee      Change from
 Line         Item           estimate     recommendation  budget request
------------------------------------------------------------------------
    1 Trident II Mods        1,224,683       1,211,983         -12,700
          Reduce        ..............  ..............         -12,700
           Unjustified
           Program
           Support
           Costs
    3 Tomahawk                 308,970         298,970         -10,000
          Contract      ..............  ..............         -10,000
           Savings
    4 AMRAAM                   102,683          92,359         -10,324
          Captive Air   ..............  ..............         -10,324
           Training
           Missile
           Cost Growth
    5 Sidewinder                80,226          74,267          -5,959
          All Up Round  ..............  ..............          -3,847
           Missile
           Cost Growth
          Captive Air   ..............  ..............          -2,112
           Training
           Missile
           Cost Growth
    7 Standard Missile         399,482         381,762         -17,720
          SM-6          ..............  ..............         -17,720
           Maintain
           FY12
           Production
           Levels
   11 Aerial Targets            61,518          59,862          -1,656
          Rocket Motor  ..............  ..............          -1,656
           Unit Cost
           Growth
   28 CIWS Mods                 59,303          67,003          +7,700
          Authorizatio  ..............  ..............          +7,700
           n Increase
           to Buy
           Additional
           RMA Kits
------------------------------------------------------------------------

    Standard Missile 6 [SM-6].--The Committee recommends 
$381,762,000 for procurement of the SM-6 missile in Weapons 
Procurement, Navy, a decrease of $17,720,000 below the budget 
request. The fiscal year 2013 budget requests an increase in 
production rates even though the program is experiencing unit 
cost increases, continues to have problems with operational 
testing, and delayed its full-rate production. As a result, the 
Committee is concerned with the concurrency in this program and 
provides funding for a total of 89 missiles, the same level of 
production as fiscal year 2012. In addition, the Committee 
recommends $43,891,000 in Research, Development, Test and 
Evaluation, Navy, a decrease of $20,000,000 below the request, 
due to program execution delays.

            Procurement of Ammunition, Navy and Marine Corps

Appropriations, 2012....................................    $626,848,000
Budget estimate, 2013...................................     759,539,000
House allowance.........................................     677,243,000
Committee recommendation................................     719,154,000

    The Committee recommends an appropriation of $719,154,000. 
This is $40,385,000 below the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                                     [Dollars in thousands]
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                                     Change from               Change from
Line                            Item                              Qty.     2013 budget      Qty.   House allowance    Qty.      Committee    ---------------------------------------------------
                                                                             estimate                                         recommendation    Qty.   Budget estimate    Qty.   House allowance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
             PROCUREMENT OF AMMO, NAVY & MARINE CORPS

     PROC AMMO, NAVY

     NAVY AMMUNITION
   1 GENERAL PURPOSE BOMBS                                    .......          $27,024  .......          $26,024  .......          $27,024  .......  ...............  .......          +$1,000
   2 AIRBORNE ROCKETS, ALL TYPES                              .......           56,575  .......           54,775  .......           56,575  .......  ...............  .......           +1,800
   3 MACHINE GUN AMMUNITION                                   .......           21,266  .......           20,266  .......           21,266  .......  ...............  .......           +1,000
   4 PRACTICE BOMBS                                           .......           34,319  .......           32,619  .......           34,319  .......  ...............  .......           +1,700
   5 CARTRIDGES & CART ACTUATED DEVICES                       .......           53,755  .......           53,755  .......           53,755  .......  ...............  .......  ...............
   6 AIR EXPENDABLE COUNTERMEASURES                           .......           61,693  .......           58,233  .......           60,693  .......          -$1,000  .......           +2,460
   7 JATOS                                                    .......            2,776  .......            2,776  .......            2,776  .......  ...............  .......  ...............
     LRLAP 6" LONG RANGE ATTACK PROJECTILE                    .......            7,102  .......            7,102  .......            7,102  .......  ...............  .......  ...............
   9 5 INCH/54 GUN AMMUNITION                                 .......           48,320  .......           48,320  .......           48,320  .......  ...............  .......  ...............
  10 INTERMEDIATE CALIBER GUN AMMUNITION                      .......           25,544  .......           25,544  .......           18,544  .......           -7,000  .......           -7,000
  11 OTHER SHIP GUN AMMUNITION                                .......           41,624  .......           36,184  .......           38,884  .......           -2,740  .......           +2,700
  12 SMALL ARMS & LANDING PARTY AMMO                          .......           65,893  .......           63,515  .......           65,247  .......             -646  .......           +1,732
  13 PYROTECHNIC AND DEMOLITION                               .......           11,176  .......           11,176  .......           11,176  .......  ...............  .......  ...............
  14 AMMUNITION LESS THAN $5 MILLION                          .......            4,116  .......            4,116  .......            4,116  .......  ...............  .......  ...............
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, PROC AMMO, NAVY                             .......          461,183  .......          444,405  .......          449,797  .......          -11,386  .......           +5,392

     PROC AMMO, MARINE CORPS

     MARINE CORPS AMMUNITION
  15 SMALL ARMS AMMUNITION                                    .......           83,733  .......           75,759  .......           77,429  .......           -6,304  .......           +1,670
  16 LINEAR CHARGES, ALL TYPES                                .......           24,645  .......           18,253  .......           24,645  .......  ...............  .......           +6,392
  17 40 MM, ALL TYPES                                         .......           16,201  .......           16,201  .......           16,201  .......  ...............  .......  ...............
  19 81MM, ALL TYPES                                          .......           13,711  .......            3,711  .......           13,711  .......  ...............  .......          +10,000
  20 120MM, ALL TYPES                                         .......           12,557  .......           12,557  .......           12,557  .......  ...............  .......  ...............
  22 GRENADES, ALL TYPES                                      .......            7,634  .......            6,185  .......            7,634  .......  ...............  .......           +1,449
  23 ROCKETS, ALL TYPES                                       .......           27,528  .......           27,528  .......           27,528  .......  ...............  .......  ...............
  24 ARTILLERY, ALL TYPES                                     .......           93,065  .......           55,409  .......           76,459  .......          -16,606  .......          +21,050
  25 DEMOLITION MUNITIONS, ALL TYPES                          .......            2,047  .......  ...............  .......  ...............  .......           -2,047  .......  ...............
  26 FUZE, ALL TYPES                                          .......            5,297  .......            5,297  .......            1,255  .......           -4,042  .......           -4,042
  27 NON LETHALS                                              .......            1,362  .......            1,362  .......            1,362  .......  ...............  .......  ...............
  28 AMMO MODERNIZATION                                       .......            4,566  .......            4,566  .......            4,566  .......  ...............  .......  ...............
  29 ITEMS LESS THAN $5 MILLION                               .......            6,010  .......            6,010  .......            6,010  .......  ...............  .......  ...............
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, PROC AMMO, MARINE CORPS                     .......          298,356  .......          232,838  .......          269,357  .......          -28,999  .......          +36,519
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, PROCUREMENT OF AMMO, NAVY & MARINE CORPS    .......          759,539  .......          677,243  .......          719,154  .......          -40,385  .......          +41,911
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                            2013 budget      Committee      Change from
Line         Item            estimate     recommendation  budget request
------------------------------------------------------------------------
   6Air Expendable              61,693          60,693          -1,000
     Countermeasures
        ALE-55 cost     ..............  ..............          -1,000
         growth
  10Intermediate                25,544          18,544          -7,000
     Caliber Gun
     Ammunition
        MK295           ..............  ..............          -1,100
         cartridge
         prior year
         funds
         available
        MK295           ..............  ..............          -5,900
         cartridge
         decreased
         unit cost
  11Other Ship Gun              41,624          38,884          -2,740
     Ammunition
        30MM x 173      ..............  ..............          -2,740
         linked
         cartridge
         contract
         delay
  12Small Arms &                65,893          65,247            -646
     Landing Party
     Ammo
        M18A1 mine      ..............  ..............            -646
         cost growth
  15Small Arms                  83,733          77,429          -6,304
     Ammunition
        Prior year      ..............  ..............          -6,304
         funds
         available
  24Artillery, All              93,065          76,459         -16,606
     Types
        Prior year      ..............  ..............         -16,606
         funds
         available
  25Demolition                   2,047  ..............          -2,047
     Munitions, All
     Types
        Excess to       ..............  ..............          -2,047
         requirement
  26Fuze, All Types              5,297           1,255          -4,042
        Prior year      ..............  ..............          -4,042
         funds
         available
------------------------------------------------------------------------

                   Shipbuilding and Conversion, Navy

Appropriations, 2012.................................... $14,919,114,000
Budget estimate, 2013...................................  13,579,845,000
House allowance.........................................  15,236,126,000
Committee recommendation................................  15,614,855,000

    The Committee recommends an appropriation of 
$15,614,855,000. This is $2,035,010,000 above the budget 
estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                                     [Dollars in thousands]
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                                   Change from                Change from
Line                           Item                             Qty.     2013 budget      Qty.   House allowance    Qty.      Committee    -----------------------------------------------------
                                                                           estimate                                         recommendation    Qty.   Budget estimate     Qty.    House allowance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                SHIPBUILDING & CONVERSION, NAVY

     OTHER WARSHIPS
   1 CARRIER REPLACEMENT PROGRAM                            .......         $608,195  .......         $578,295  .......         $564,371  .......         -$43,824  .........         -$13,924
   3 VIRGINIA CLASS SUBMARINE                                     2        3,217,601        2        3,217,601        2        3,217,601  .......  ...............  .........  ...............
   4 VIRGINIA CLASS SUBMARINE (AP-CY)                       .......          874,878  .......        1,597,878  .......        1,652,557  .......         +777,679  .........          +54,679
   5 CVN REFUELING OVERHAUL                                 .......        1,613,392  .......        1,613,392  .......        1,613,392  .......  ...............  .........  ...............
   6 CVN REFUELING OVERHAULS (AP-CY)                        .......           70,010  .......           70,010  .......           70,010  .......  ...............  .........  ...............
   8 DDG 1000                                               .......          669,222  .......          669,222  .......          669,222  .......  ...............  .........  ...............
   9 DDG-51                                                       2        3,048,658        3        4,036,628        3        4,048,658       +1       +1,000,000  .........          +12,030
  10 DDG-51 (AP-CY)                                         .......          466,283  .......          466,283  .......          466,283  .......  ...............  .........  ...............
  11 LITTORAL COMBAT SHIP                                         4        1,784,959        4        1,784,959        4        1,784,959  .......  ...............  .........  ...............
                                                           -------------------------------------------------------------------------------------------------------------------------------------
           TOTAL, OTHER WARSHIPS                            .......       12,353,198  .......       14,034,268  .......       14,087,053  .......       +1,733,855  .........          +52,785

  13 LPD-17(AP)                                             .......  ...............  .......  ...............  .......          263,255  .......         +263,255  .........         +263,255
  16 JOINT HIGH SPEED VESSEL                                      1          189,196        1          189,196        1          189,196  .......  ...............  .........  ...............
                                                           -------------------------------------------------------------------------------------------------------------------------------------
           TOTAL, AMPHIBIOUS SHIPS                          .......          189,196  .......          189,196  .......          452,451  .......         +263,255  .........         +263,255

  17 MOORED TRAINING SHIP                                   .......          307,300  .......          307,300  .......          307,300  .......  ...............  .........  ...............
  18 OUTFITTING                                             .......          309,648  .......          284,859  .......          309,648  .......  ...............  .........          +24,789
  20 LCAC SLEP                                                    2           47,930        2           47,930        4           85,830       +2          +37,900         +2          +37,900
  21 COMPLETION OF PY SHIPBUILDING PROGRAMS                 .......          372,573  .......          372,573  .......          372,573  .......  ...............  .........  ...............
                                                           -------------------------------------------------------------------------------------------------------------------------------------
           TOTAL, AUXILIARIES, CRAFT, AND PRIOR-YEAR        .......        1,037,451  .......        1,012,662  .......        1,075,351  .......          +37,900  .........          +62,689
            PROGRAM
                                                           -------------------------------------------------------------------------------------------------------------------------------------
           TOTAL, SHIPBUILDING & CONVERSION, NAVY           .......       13,579,845  .......       15,236,126  .......       15,614,855  .......       +2,035,210  .........         +378,729
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                         2013 budget       Committee       Change from
Line        Item           estimate      recommendation  budget estimate
------------------------------------------------------------------------
   1Carrier                  608,195          564,371          -43,824
     Replacement
     Program
        CVN-79--exc  ...............  ...............          -28,000
         essive
         cost
         growth
        AN/UPX-      ...............  ...............          -10,824
         29(V) IFF--
         revised
         cost
         estimate
        ESS, SEWIP   ...............  ...............           -5,000
         Block 2--
         pricing
         adjustment
   4Virginia Class           874,878        1,652,557         +777,679
     Submarine
        Advance      ...............  ...............         +777,679
         procuremen
         t for
         second SSN
         in fiscal
         year 2014--
         authorizat
         ion
         adjustment
   9DDG-51                 3,149,381        4,149,381       +1,000,000
        Additional   ...............  ...............       +1,000,000
         ship
  13LPD-17           ...............          263,255         +263,255
        LPD-17       ...............  ...............         +263,255
         Advance
         Procuremen
         t
  20LCAC SLEP                 47,930           85,830          +37,900
        LCAC SLEP--  ...............  ...............          +37,900
         restore
         unjustifie
         d
         reduction
         of two
------------------------------------------------------------------------

    Navy Shipbuilding Plans.--The fiscal year 2013 budget 
request includes $13,579,845,000 in Shipbuilding and 
Conversion, Navy [SCN], a decrease of $1,339,269,000 from 
amounts appropriated in fiscal year 2012. The Navy's projected 
fiscal year 2014 SCN budget request is a further decrease of no 
less than $1,000,000,000.
    The Committee is concerned with the apparent disconnect 
between the Navy's publicly stated priorities and the Navy's 
fiscal year 2013 shipbuilding budget submission which, as 
compared to the fiscal year 2012 plan, reduces planned ship 
procurement for the next 5 years by 16 ships and eliminates 
funding for one Virginia class attack submarine, one amphibious 
ship, and three oilers. In addition, the Navy's budget request 
omits funding for an additional Arleigh Burke class guided 
missile destroyer contrary to the Navy's force structure goals. 
The Committee is concerned that these proposed adjustments will 
drive up costs for multiple classes of ships and negatively 
impact the industrial base, almost certainly leading to 
additional cost growth in shipbuilding.
    The Committee notes that it was just 3 years ago that the 
Navy had implemented sufficient cost-reduction measures to 
allow for the procurement of two Virginia class attack 
submarines per year. The Committee is troubled that the Navy 
removed one Virginia class attack submarine from its near-term 
shipbuilding plan, particularly when the Navy is seeking 
multiyear procurement authority for Virginia class submarines 
to be procured from fiscal years 2014 through 2018. The 
Committee has been informed by the Navy that procuring 10 
Virginia class submarines in the next multiyear procurement 
instead of 9 as proposed in the fiscal year 2013 budget request 
would result in an average submarine unit cost reduction in 
excess of $120,000,000. The Committee believes that these cost 
savings and the avoidance of industrial base perturbations 
warrant the inclusion of a tenth Virginia class submarine in 
the next multiyear procurement.
    The Committee has been advised by the Navy that the 
addition of a tenth submarine, which would be procured in 
fiscal year 2014, to the multiyear procurement necessitates 
Advance Procurement funding in fiscal year 2013. Therefore, the 
Committee recommends an additional $777,679,000 only for 
Advance Procurement of a second Virginia class submarine in 
fiscal year 2014, as authorized in S. 3254, the National 
Defense Authorization Act for Fiscal Year 2013, as reported. As 
noted in Senate Report 112-173 to accompany S. 3254, as 
reported, procurement of an additional submarine in fiscal year 
2014 will help alleviate an attack submarine shortfall 
anticipated in 2022. In addition, the Committee understands 
that current budget constraints make full funding of all 10 
submarines included in the multiyear procurement in accordance 
with the Department's Financial Management Regulations 
unaffordable, but that incrementally funding these submarines 
allows for their procurement within the current budget. While 
incremental funding authority is currently only provided for 
aircraft carriers and large-deck amphibious ships, the 
Committee notes the precedence for incrementally funding a 
submarine and recommends incremental funding authority only for 
the Virginia class submarines to be procured under the next 
multiyear procurement.
    In addition, the fiscal year 2013 budget request includes a 
proposal to procure nine Arleigh Burke class guided missile 
destroyers at a rate of two ships per year for the next 5 years 
with the exception of fiscal year 2014, where the Navy has only 
budgeted for one Arleigh Burke class guided missile destroyer. 
The Committee has been informed by the Navy that a tenth 
destroyer could be added to this multiyear procurement at a 
significantly lower ship unit cost. According to the Navy, 
those costs could be partially offset with savings generated 
from previous competitive procurements, with the balance of 
funding required in the fiscal year 2014 shipbuilding budget 
request. Recognizing the fiscal pressures on the Navy's fiscal 
year 2014 shipbuilding budget, the Committee recommends taking 
advantage of these significant cost savings now and recommends 
an additional $1,000,000,000 in fiscal year 2013 to fully fund 
a tenth Arleigh Burke class guided missile destroyer within the 
next multiyear procurement.
    The Committee notes that within this multiyear procurement, 
the Navy intends to include next generation Flight III Arleigh 
Burke class guided missile destroyers with an improved radar 
suite and combat systems capability as an Engineering Change 
Proposal [ECP]. Since the radar is still in development, 
acquisition authorities within the Department have yet to be 
established, and the ECP has no defined scope and associated 
cost estimates, the Committee finds it premature to request 
authority for this ECP within the multiyear procurement at this 
time. Therefore, the Committee provides multiyear procurement 
authority only for Flight IIA Arleigh Burke class guided 
missile destroyers, as authorized in S. 3254, the National 
Defense Authorization Act for Fiscal Year 2013, as reported.
    Finally, the fiscal year 2013 budget request includes a 
proposal to eliminate an amphibious class warship from the 5-
year shipbuilding plan, and defers funding for the only other 
amphibious ship in the Navy's 5-year plan until fiscal year 
2017. As detailed in section 130 of S. 3254, the National 
Defense Authorization Act for Fiscal Year 2013, as reported, 
the Navy and Marine Corps have agreed on a fiscally constrained 
minimum force of 33 ships to meet a 38 amphibious warship force 
requirement. Currently, there are 29 ships in the Department of 
the Navy's amphibious fleet and the most recent shipbuilding 
and retirement plan submitted to Congress reduces the force to 
28 vessels in fiscal year 2015. If all amphibious warships 
currently in the inventory were operationally available, the 
Marine Expeditionary Brigade assault echelon would be lacking 
approximately 400,000 square feet of vehicle stowage and 3 
million gallons of JP-5 jet fuel. However, since 10 to 15 
percent of warships are in overhaul and unavailable at any 
given time, the number of operationally available amphibious 
warships leaves an even greater shortfall and is significantly 
below the minimum lift requirement stated by the Department of 
the Navy.
    The Committee is deeply concerned about the level of risk 
being assumed with amphibious lift capability and the impact 
this has on Commanders to meet operations plans and crisis 
response requirements, particularly as the Department of 
Defense rebalances its global posture towards the Asia-Pacific 
region. The Committee is also concerned about the ability to 
address this assumed risk when the next amphibious class 
warship in the Navy's shipbuilding plan does not appear until 5 
years from now. As noted earlier, this proposal and funding gap 
will almost certainly have a negative industrial base impact 
and lead to additional cost growth in multiple shipbuilding 
programs. Therefore, to start addressing the amphibious lift 
shortfall that exists today, the Committee recommends an 
additional $263,255,000 only for Advance Procurement of 
continued LPD-17 Class amphibious ship production.
    Landing Craft Air Cushioned [LCAC] Service Life Extension 
Program [SLEP].--The fiscal year 2013 budget request includes 
$47,930,000 for two LCAC SLEPs, a reduction of two from the 
prior year, and two less than what is budgeted in each 
subsequent fiscal year through 2018. Therefore, the Committee 
finds the Navy's proposal of a 1-year reduction to the 
acquisition profile inefficient and recommends an additional 
$37,900,000 to restore two LCAC SLEPS in fiscal year 2013.
    Harbor Yard Tugs.--The fiscal year 2013 budget request 
includes no funding for Harbor Yard Tugs. The Committee notes 
that the last procurement of Harbor Yard Tugs was in fiscal 
year 2009 and is concerned about the impact of this acquisition 
pause on the industrial base. The Committee directs the 
Assistant Secretary of the Navy for Research, Development and 
Acquisition to submit to the congressional defense committees a 
report on the long range strategy for Harbor Yard Tugs, to 
include the potential application of hybrid technology, with 
the fiscal year 2014 budget submission.

                        Other Procurement, Navy

Appropriations, 2012....................................  $6,013,385,000
Budget estimate, 2013...................................   6,169,378,000
House allowance.........................................   6,364,191,000
Committee recommendation................................   6,170,286,000

    The Committee recommends an appropriation of 
$6,170,286,000. This is $908,000 above the budget estimate.

                     committee recommended program

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                                     [Dollars in thousands]
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                                   Change from                Change from
Line                           Item                             Qty.     2013 budget      Qty.   House allowance    Qty.      Committee    -----------------------------------------------------
                                                                           estimate                                         recommendation    Qty.   Budget estimate     Qty.    House allowance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                    OTHER PROCUREMENT, NAVY

     SHIPS SUPPORT EQUIPMENT

     SHIP PROPULSION EQUIPMENT
   1 LM-2500 GAS TURBINE                                    .......          $10,658  .......          $10,658  .......          $10,658  .......  ...............  .........  ...............
   2 ALLISON 501K GAS TURBINE                               .......            8,469  .......            3,983  .......            8,469  .......  ...............  .........          +$4,486

     NAVIGATION EQUIPMENT
   3 OTHER NAVIGATION EQUIPMENT                             .......           23,392  .......           23,392  .......           23,392  .......  ...............  .........  ...............

     PERISCOPES
   4 SUB PERISCOPES & IMAGING EQUIP                         .......           53,809  .......           52,609  .......           53,809  .......  ...............  .........           +1,200

     OTHER SHIPBOARD EQUIPMENT
   5 DDG MOD                                                .......          452,371  .......          412,656  .......          452,371  .......  ...............  .........          +39,715
   6 FIREFIGHTING EQUIPMENT                                 .......           16,958  .......            9,099  .......           16,958  .......  ...............  .........           +7,859
   7 COMMAND AND CONTROL SWITCHBOARD                        .......            2,492  .......            2,492  .......            2,492  .......  ...............  .........  ...............
   8 POLLUTION CONTROL EQUIPMENT                            .......           20,707  .......           18,498  .......           20,707  .......  ...............  .........           +2,209
   9 SUBMARINE SUPPORT EQUIPMENT                            .......           12,046  .......           12,046  .......           24,546  .......         +$12,500  .........          +12,500
  10 VIRGINIA CLASS SUPPORT EQUIPMENT                       .......           79,870  .......           77,458  .......           79,870  .......  ...............  .........           +2,412
  11 LCS CLASS SUPPORT EQUIPMENT                            .......           19,865  .......            9,300  .......           19,865  .......  ...............  .........          +10,565
  12 SUBMARINE BATTERIES                                    .......           41,522  .......           40,058  .......           41,522  .......  ...............  .........           +1,464
  13 LPD CLASS SUPPORT EQUIPMENT                            .......           30,543  .......           28,048  .......           30,543  .......  ...............  .........           +2,495
  14 STRATEGIC PLATFORM SUPPORT EQUIP                       .......           16,257  .......           16,257  .......           16,257  .......  ...............  .........  ...............
  15 DSSP EQUIPMENT                                         .......            3,630  .......            3,630  .......            3,630  .......  ...............  .........  ...............
  16 CG-MODERNIZATION                                       .......          101,000  .......          607,660  .......          101,000  .......  ...............  .........         -506,660
  17 LCAC                                                   .......           16,645  .......           16,645  .......           16,645  .......  ...............  .........  ...............
  18 UNDERWATER EOD PROGRAMS                                .......           35,446  .......           33,318  .......           35,446  .......  ...............  .........           +2,128
  19 ITEMS LESS THAN $5 MILLION                             .......           65,998  .......           59,026  .......           65,998  .......  ...............  .........           +6,972
  20 CHEMICAL WARFARE DETECTORS                             .......            4,359  .......            4,359  .......            4,359  .......  ...............  .........  ...............
  21 SUBMARINE LIFE SUPPORT SYSTEM                          .......           10,218  .......            6,610  .......           10,218  .......  ...............  .........           +3,608

     REACTOR PLANT EQUIPMENT
  22 REACTOR POWER UNITS                                    .......          286,859  .......          286,859  .......          286,859  .......  ...............  .........  ...............
  23 REACTOR COMPONENTS                                     .......          278,503  .......          278,503  .......          278,503  .......  ...............  .........  ...............

     OCEAN ENGINEERING
  24 DIVING AND SALVAGE EQUIPMENT                           .......            8,998  .......            8,998  .......            8,998  .......  ...............  .........  ...............

     SMALL BOATS
  25 STANDARD BOATS                                         .......           30,131  .......           30,131  .......           30,131  .......  ...............  .........  ...............

     TRAINING EQUIPMENT
  26 OTHER SHIPS TRAINING EQUIPMENT                         .......           29,772  .......           29,772  .......           29,772  .......  ...............  .........  ...............

     PRODUCTION FACILITIES EQUIPMENT
  27 OPERATING FORCES IPE                                   .......           64,346  .......          104,346  .......          104,346  .......          +40,000  .........  ...............

     OTHER SHIP SUPPORT
  28 NUCLEAR ALTERATIONS                                    .......          154,652  .......          154,652  .......          154,652  .......  ...............  .........  ...............
  29 LCS MODULES                                            .......           31,319  .......           31,319  .......           31,319  .......  ...............  .........  ...............
  30 LCS MCM MISSION MODULES                                .......           38,392  .......           38,392  .......           38,392  .......  ...............  .........  ...............
  31 LCS SUW MISSION MODULES                                .......           32,897  .......           32,897  .......           32,897  .......  ...............  .........  ...............

     LOGISTICS SUPPORT
  32 LSD MIDLIFE                                            .......           49,758  .......           23,951  .......           49,758  .......  ...............  .........          +25,807
                                                           -------------------------------------------------------------------------------------------------------------------------------------
           TOTAL, SHIPS SUPPORT EQUIPMENT                   .......        2,031,882  .......        2,467,622  .......        2,084,382  .......          +52,500  .........         -383,240

     COMMUNICATIONS AND ELECTRONICS EQUIPMENT

     SHIP RADARS

     SHIP SONARS
  34 SPQ-9B RADAR                                           .......           19,777  .......           19,777  .......           19,777  .......  ...............  .........  ...............
  35 AN/SQQ-89 SURF ASW COMBAT SYSTEM                       .......           89,201  .......           88,201  .......           89,201  .......  ...............  .........           +1,000
  36 SSN ACOUSTICS                                          .......          190,874  .......          190,874  .......          190,874  .......  ...............  .........  ...............
  37 UNDERSEA WARFARE SUPPORT EQUIPMENT                     .......           17,035  .......           17,035  .......           17,035  .......  ...............  .........  ...............
  38 SONAR SWITCHES AND TRANSDUCERS                         .......           13,410  .......           13,410  .......           13,410  .......  ...............  .........  ...............

     ASW ELECTRONIC EQUIPMENT
  40 SUBMARINE ACOUSTIC WARFARE SYSTEM                      .......           21,489  .......           15,657  .......           19,489  .......           -2,000  .........           +3,832
  41 SSTD                                                   .......           10,716  .......           10,716  .......           10,716  .......  ...............  .........  ...............
  42 FIXED SURVEILLANCE SYSTEM                              .......           98,896  .......           98,896  .......           98,896  .......  ...............  .........  ...............
  43 SURTASS                                                .......            2,774  .......            2,774  .......            2,774  .......  ...............  .........  ...............
  44 TACTICAL SUPPORT CENTER                                .......           18,428  .......           18,428  .......           18,428  .......  ...............  .........  ...............

     ELECTRONIC WARFARE EQUIPMENT
  45 AN/SLQ-32                                              .......           92,270  .......           71,978  .......           92,270  .......  ...............  .........          +20,292

     RECONNAISSANCE EQUIPMENT
  46 SHIPBOARD IW EXPLOIT                                   .......          107,060  .......           97,064  .......          107,060  .......  ...............  .........           +9,996
  47 AUTOMATED IDENTIFICATION SYSTEM [AIS]                  .......              914  .......              914  .......              914  .......  ...............  .........  ...............

     SUBMARINE SURVEILLANCE EQUIPMENT
  48 SUBMARINE SUPPORT EQUIPMENT PROG                       .......           34,050  .......           34,050  .......           34,050  .......  ...............  .........  ...............

     OTHER SHIP ELECTRONIC EQUIPMENT
  49 COOPERATIVE ENGAGEMENT CAPABILITY                      .......           27,881  .......           22,191  .......           17,981  .......           -9,900  .........           -4,210
  50 TRUSTED INFORMATION SYSTEM [TIS]                       .......              448  .......              448  .......              448  .......  ...............  .........  ...............
  51 NAVAL TACTICAL COMMAND SUPPORT SYSTEM  [NTCSS]         .......           35,732  .......           33,737  .......           35,732  .......  ...............  .........           +1,995
  53 NAVY COMMAND AND CONTROL SYSTEM [NCCS]                 .......            9,533  .......            9,533  .......            9,533  .......  ...............  .........  ...............
  54 MINESWEEPING SYSTEM REPLACEMENT                        .......           60,111  .......           45,654  .......           60,111  .......  ...............  .........          +14,457
  55 SHALLOW WATER MCM                                      .......            6,950  .......            6,950  .......            6,950  .......  ...............  .........  ...............
  56 NAVSTAR GPS RECEIVERS (SPACE)                          .......            9,089  .......            9,089  .......            9,089  .......  ...............  .........  ...............
  57 ARMED FORCES RADIO AND TV                              .......            7,768  .......            5,568  .......            7,768  .......  ...............  .........           +2,200
  58 STRATEGIC PLATFORM SUPPORT EQUIP                       .......            3,614  .......            3,614  .......            3,614  .......  ...............  .........  ...............

     TRAINING EQUIPMENT
  59 OTHER TRAINING EQUIPMENT                               .......           42,911  .......           41,421  .......           42,911  .......  ...............  .........           +1,490

     AVIATION ELECTRONIC EQUIPMENT
  60 MATCALS                                                .......            5,861  .......            5,861  .......            5,861  .......  ...............  .........  ...............
  61 SHIPBOARD AIR TRAFFIC CONTROL                          .......            8,362  .......            8,362  .......            8,362  .......  ...............  .........  ...............
  62 AUTOMATIC CARRIER LANDING SYSTEM                       .......           15,685  .......           13,623  .......           15,685  .......  ...............  .........           +2,062
  63 NATIONAL AIR SPACE SYSTEM                              .......           16,919  .......           14,512  .......           16,919  .......  ...............  .........           +2,407
  64 AIR STATION SUPPORT EQUIPMENT                          .......            6,828  .......            6,828  .......            6,828  .......  ...............  .........  ...............
  65 MICROWAVE LANDING SYSTEM                               .......            7,646  .......            7,646  .......            7,646  .......  ...............  .........  ...............
  66 ID SYSTEMS                                             .......           35,474  .......           29,856  .......           35,474  .......  ...............  .........           +5,618
  67 TAC A/C MISSION PLANNING SYS [TAMPS]                   .......            9,958  .......            9,958  .......            9,958  .......  ...............  .........  ...............

     OTHER SHORE ELECTRONIC EQUIPMENT
  68 DEPLOYABLE JOINT COMMAND AND CONT                      .......            9,064  .......            9,064  .......            9,064  .......  ...............  .........  ...............
  69 TADIX-B                                                .......           16,026  .......           14,882  .......           16,026  .......  ...............  .........           +1,144
  70 GCCS-M EQUIPMENT TACTICAL/MOBILE                       .......           11,886  .......           11,886  .......           11,886  .......  ...............  .........  ...............
  71 DCGS-N                                                 .......           11,887  .......           11,887  .......           11,887  .......  ...............  .........  ...............
  72 CANES                                                  .......          341,398  .......          320,874  .......          320,874  .......          -20,524  .........  ...............
  73 RADIAC                                                 .......            8,083  .......            8,083  .......            8,083  .......  ...............  .........  ...............
  74 CANES-INTELL                                           .......           79,427  .......           67,956  .......           79,427  .......  ...............  .........          +11,471
  75 GPETE                                                  .......            6,083  .......            6,083  .......            6,083  .......  ...............  .........  ...............
  76 INTEG COMBAT SYSTEM TEST FACILITY                      .......            4,495  .......            4,495  .......            4,495  .......  ...............  .........  ...............
  77 EMI CONTROL INSTRUMENTATION                            .......            4,767  .......            4,767  .......            4,767  .......  ...............  .........  ...............
  78 ITEMS LESS THAN $5 MILLION                             .......           81,755  .......           60,555  .......           81,755  .......  ...............  .........          +21,200

     SHIPBOARD COMMUNICATIONS
  80 SHIP COMMUNICATIONS AUTOMATION                         .......           56,870  .......           55,166  .......           56,870  .......  ...............  .........           +1,704
  81 MARITIME DOMAIN AWARENESS [MDA]                        .......            1,063  .......            1,063  .......            1,063  .......  ...............  .........  ...............
  82 COMMUNICATIONS ITEMS UNDER $5M                         .......           28,522  .......           28,522  .......           28,522  .......  ...............  .........  ...............

     SUBMARINE COMMUNICATIONS
  83 SUBMARINE BROADCAST SUPPORT                            .......            4,183  .......            4,183  .......            4,183  .......  ...............  .........  ...............
  84 SUBMARINE COMMUNICATION EQUIPMENT                      .......           69,025  .......           63,423  .......           69,025  .......  ...............  .........           +5,602

     SATELLITE COMMUNICATIONS
  85 SATELLITE COMMUNICATIONS SYSTEMS                       .......           49,294  .......           49,294  .......           49,294  .......  ...............  .........  ...............
  86 NAVY MULTIBAND TERMINAL [NMT]                          .......          184,825  .......          124,612  .......          184,825  .......  ...............  .........          +60,213

     SHORE COMMUNICATIONS
  87 JCS COMMUNICATIONS EQUIPMENT                           .......            2,180  .......            2,180  .......            2,180  .......  ...............  .........  ...............
  88 ELECTRICAL POWER SYSTEMS                               .......            1,354  .......            1,354  .......            1,354  .......  ...............  .........  ...............

     CRYPTOGRAPHIC EQUIPMENT
  90 INFO SYSTEMS SECURITY PROGRAM [ISSP]                   .......          144,104  .......          142,193  .......          144,104  .......  ...............  .........           +1,911

     CRYPTOLOGIC EQUIPMENT
  91 CRYPTOLOGIC COMMUNICATIONS EQUIP                       .......           12,604  .......           12,604  .......           12,604  .......  ...............  .........  ...............

     OTHER ELECTRONIC SUPPORT
  92 COAST GUARD EQUIPMENT                                  .......            6,680  .......            6,680  .......            6,680  .......  ...............  .........  ...............
                                                           -------------------------------------------------------------------------------------------------------------------------------------
           TOTAL, COMMUNICATIONS AND ELECTRONICS EQUIPMENT  .......        2,163,239  .......        1,966,431  .......        2,130,815  .......          -32,424  .........         +164,384

     AVIATION SUPPORT EQUIPMENT

     SONOBUOYS
  95 SONOBUOYS--ALL TYPES                                   .......          104,677  .......          104,677  .......          104,677  .......  ...............  .........  ...............

     AIRCRAFT SUPPORT EQUIPMENT
  96 WEAPONS RANGE SUPPORT EQUIPMENT                        .......           70,753  .......           67,253  .......           85,753  .......          +15,000  .........          +18,500
  97 EXPEDITIONARY AIRFIELDS                                .......            8,678  .......            8,678  .......            8,678  .......  ...............  .........  ...............
  98 AIRCRAFT REARMING EQUIPMENT                            .......           11,349  .......            9,269  .......           11,349  .......  ...............  .........           +2,080
  99 AIRCRAFT LAUNCH & RECOVERY EQUIPMENT                   .......           82,618  .......           81,980  .......           72,618  .......          -10,000  .........           -9,362
 100 METEOROLOGICAL EQUIPMENT                               .......           18,339  .......           18,339  .......           18,339  .......  ...............  .........  ...............
 101 OTHER PHOTOGRAPHIC EQUIPMENT                           .......            1,414  .......            1,414  .......            1,414  .......  ...............  .........  ...............
 102 AVIATION LIFE SUPPORT                                  .......           40,475  .......           38,675  .......           40,475  .......  ...............  .........           +1,800
 103 AIRBORNE MINE COUNTERMEASURES                          .......           61,552  .......           59,552  .......           61,552  .......  ...............  .........           +2,000
 104 LAMPS MK III SHIPBOARD EQUIPMENT                       .......           18,771  .......           17,614  .......           18,771  .......  ...............  .........           +1,157
 105 PORTABLE ELECTRONIC MAINTENANCE AIDS                   .......            7,954  .......            7,954  .......            7,954  .......  ...............  .........  ...............
 106 OTHER AVIATION SUPPORT EQUIPMENT                       .......           10,023  .......            8,377  .......           10,023  .......  ...............  .........           +1,646
 107 AUTONOMIC LOGISTICS INFORMATION SYSTEM [ALIS]          .......            3,826  .......            3,826  .......            3,826  .......  ...............  .........  ...............
                                                           -------------------------------------------------------------------------------------------------------------------------------------
           TOTAL, AVIATION SUPPORT EQUIPMENT                .......          440,429  .......          427,608  .......          445,429  .......           +5,000  .........          +17,821

     ORDNANCE SUPPORT EQUIPMENT

     SHIP GUN SYSTEM EQUIPMENT
 108 NAVAL FIRES CONTROL SYSTEM                             .......            3,472  .......            3,472  .......            3,472  .......  ...............  .........  ...............
 109 GUN FIRE CONTROL EQUIPMENT                             .......            4,528  .......            4,528  .......            4,528  .......  ...............  .........  ...............

     SHIP MISSILE SYSTEMS EQUIPMENT
 110 NATO SEASPARROW                                        .......            8,960  .......            8,960  .......            8,960  .......  ...............  .........  ...............
 111 RAM GMLS                                               .......            1,185  .......            1,185  .......            1,185  .......  ...............  .........  ...............
 112 SHIP SELF DEFENSE SYSTEM                               .......           55,371  .......           53,073  .......           55,371  .......  ...............  .........           +2,298
 113 AEGIS SUPPORT EQUIPMENT                                .......           81,614  .......           78,614  .......           81,614  .......  ...............  .........           +3,000
 114 TOMAHAWK SUPPORT EQUIPMENT                             .......           77,767  .......           72,267  .......           68,117  .......           -9,650  .........           -4,150
 115 VERTICAL LAUNCH SYSTEMS                                .......              754  .......              754  .......              754  .......  ...............  .........  ...............
 116 MARITIME INTEGRATED PLANNING SYSTEM--MIPS              .......            4,965  .......            3,965  .......            4,965  .......  ...............  .........           +1,000

     FBM SUPPORT EQUIPMENT
 117 STRATEGIC MISSILE SYSTEMS EQUIP                        .......          181,049  .......          173,549  .......          181,049  .......  ...............  .........           +7,500

     ASW SUPPORT EQUIPMENT
 118 SSN COMBAT CONTROL SYSTEMS                             .......           71,316  .......           71,316  .......           71,316  .......  ...............  .........  ...............
 119 SUBMARINE ASW SUPPORT EQUIPMENT                        .......            4,018  .......            4,018  .......            4,018  .......  ...............  .........  ...............
 120 SURFACE ASW SUPPORT EQUIPMENT                          .......            6,465  .......            6,465  .......            6,465  .......  ...............  .........  ...............
 121 ASW RANGE SUPPORT EQUIPMENT                            .......           47,930  .......           47,930  .......           47,930  .......  ...............  .........  ...............

     OTHER ORDNANCE SUPPORT EQUIPMENT
 122 EXPLOSIVE ORDNANCE DISPOSAL EQUIP                      .......            3,579  .......            3,579  .......            3,579  .......  ...............  .........  ...............
 123 ITEMS LESS THAN $5 MILLION                             .......            3,125  .......            3,125  .......            3,125  .......  ...............  .........  ...............

     OTHER EXPENDABLE ORDNANCE
 124 ANTI-SHIP MISSILE DECOY SYSTEM                         .......           31,743  .......           29,743  .......           29,743  .......           -2,000  .........  ...............
 125 SURFACE TRAINING DEVICE MODS                           .......           34,174  .......           34,174  .......           34,174  .......  ...............  .........  ...............
 126 SUBMARINE TRAINING DEVICE MODS                         .......           23,450  .......           23,450  .......           23,450  .......  ...............  .........  ...............
                                                           -------------------------------------------------------------------------------------------------------------------------------------
           TOTAL, ORDNANCE SUPPORT EQUIPMENT                .......          645,465  .......          624,167  .......          633,815  .......          -11,650  .........           +9,648

     CIVIL ENGINEERING SUPPORT EQUIPMENT
 127 PASSENGER CARRYING VEHICLES                            .......            7,158  .......            7,158  .......            7,158  .......  ...............  .........  ...............
 128 GENERAL PURPOSE TRUCKS                                 .......            3,325  .......            3,325  .......            3,325  .......  ...............  .........  ...............
 129 CONSTRUCTION & MAINTENANCE EQUIP                       .......            8,692  .......            8,692  .......            8,692  .......  ...............  .........  ...............
 130 FIRE FIGHTING EQUIPMENT                                .......           14,533  .......           14,533  .......           14,533  .......  ...............  .........  ...............
 131 TACTICAL VEHICLES                                      .......           15,330  .......           15,330  .......           15,330  .......  ...............  .........  ...............
 132 AMPHIBIOUS EQUIPMENT                                   .......           10,803  .......           10,803  .......           10,803  .......  ...............  .........  ...............
 133 POLLUTION CONTROL EQUIPMENT                            .......            7,265  .......            7,265  .......            7,265  .......  ...............  .........  ...............
 134 ITEMS UNDER $5 MILLION                                 .......           15,252  .......           15,252  .......           15,252  .......  ...............  .........  ...............
 135 PHYSICAL SECURITY VEHICLES                             .......            1,161  .......            1,161  .......            1,161  .......  ...............  .........  ...............
                                                           -------------------------------------------------------------------------------------------------------------------------------------
           TOTAL, CIVIL ENGINEERING SUPPORT EQUIPMENT       .......           83,519  .......           83,519  .......           83,519  .......  ...............  .........

     SUPPLY SUPPORT EQUIPMENT

     SUPPLY SUPPORT EQUIPMENT
 136 MATERIALS HANDLING EQUIPMENT                           .......           15,204  .......           15,204  .......           15,204  .......  ...............  .........  ...............
 137 OTHER SUPPLY SUPPORT EQUIPMENT                         .......            6,330  .......            6,330  .......            6,330  .......  ...............  .........  ...............
 138 FIRST DESTINATION TRANSPORTATION                       .......            6,539  .......            6,539  .......            6,539  .......  ...............  .........  ...............
 139 SPECIAL PURPOSE SUPPLY SYSTEMS                         .......           34,804  .......           34,804  .......           22,286  .......          -12,518  .........          -12,518
                                                           -------------------------------------------------------------------------------------------------------------------------------------
           TOTAL, SUPPLY SUPPORT EQUIPMENT                  .......           62,877  .......           62,877  .......           50,359  .......          -12,518  .........          -12,518

     PERSONNEL AND COMMAND SUPPORT EQUIPMENT

     TRAINING DEVICES
 140 TRAINING SUPPORT EQUIPMENT                             .......           25,444  .......           25,444  .......           25,444  .......  ...............  .........  ...............

     COMMAND SUPPORT EQUIPMENT
 141 COMMAND SUPPORT EQUIPMENT                              .......           43,165  .......           43,165  .......           43,165  .......  ...............  .........  ...............
 142 EDUCATION SUPPORT EQUIPMENT                            .......            2,251  .......            2,251  .......            2,251  .......  ...............  .........  ...............
 143 MEDICAL SUPPORT EQUIPMENT                              .......            3,148  .......            3,148  .......            3,148  .......  ...............  .........  ...............
 146 NAVAL MIP SUPPORT EQUIPMENT                            .......            3,502  .......            3,502  .......            3,502  .......  ...............  .........  ...............
 148 OPERATING FORCES SUPPORT EQUIPMENT                     .......           15,696  .......           15,696  .......           15,696  .......  ...............  .........  ...............
 149 C4ISR EQUIPMENT                                        .......            4,344  .......            4,344  .......            4,344  .......  ...............  .........  ...............
 150 ENVIRONMENTAL SUPPORT EQUIPMENT                        .......           19,492  .......           19,492  .......           19,492  .......  ...............  .........  ...............
 151 PHYSICAL SECURITY EQUIPMENT                            .......          177,149  .......          177,149  .......          177,149  .......  ...............  .........  ...............
 152 ENTERPRISE INFORMATION TECHNOLOGY                      .......          183,995  .......          183,995  .......          183,995  .......  ...............  .........  ...............
                                                           -------------------------------------------------------------------------------------------------------------------------------------
           TOTAL, PERSONNEL AND COMMAND SUPPORT EQUIPMENT   .......          478,186  .......          478,186  .......          478,186  .......  ...............  .........

 153 SPARES AND REPAIR PARTS                                .......          250,718  .......          240,718  .......          250,718  .......  ...............  .........          +10,000
     CLASSIFIED PROGRAMS                                    .......           13,063  .......           13,063  .......           13,063  .......  ...............  .........  ...............
                                                           -------------------------------------------------------------------------------------------------------------------------------------
           TOTAL, OTHER PROCUREMENT, NAVY                   .......        6,169,378  .......        6,364,191  .......        6,170,286  .......             +908  .........         -193,905
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                 2013 budget       Committee       Change from
 Line                           Item                               estimate      recommendation  budget estimate
----------------------------------------------------------------------------------------------------------------
    9 Submarine Support Equipment                                     12,046           24,546          +12,500
          Materials research and technology                  ...............  ...............          +12,500
   27 Operating Forces IPE                                            64,346          104,346          +40,000
          Shipyard Capital investment program                ...............  ...............          +40,000
   40 Submarine Acoustic Warfare System                               21,489           19,489           -2,000
          Contract award delays for launch tube and MK3      ...............  ...............           -2,000
   49 Cooperative Engagement Capability                               27,881           17,981           -9,900
          Early need to install                              ...............  ...............           -9,900
   72 CANES                                                          341,398          320,874          -20,524
          Contract award delay and protest                   ...............  ...............          -20,524
   96 Weapons Range Support Equipment                                 70,753           85,753          +15,000
          Test and Training Range Upgrades                   ...............  ...............          +15,000
   99 Aircraft Launch and Recovery Equipment                          82,618           72,618          -10,000
          Unjustified cost growth for kit purchase           ...............  ...............          -10,000
  114 Tomahawk Support Equipment                                      77,767           68,117           -9,650
          Production support funding growth                  ...............  ...............           -9,650
  124 Anti-Ship Missile Decoy System                                  31,743           29,743           -2,000
          Installation cost growth                           ...............  ...............           -2,000
  139 Special Purpose Supply Systems                                  34,804           22,286          -12,518
          Excess to need                                     ...............  ...............          -12,518
----------------------------------------------------------------------------------------------------------------

    Submarine Combat Control Systems Procurement.--The fiscal 
year 2013 budget request includes $71,316,000 for Navy 
Submarine Combat Control Systems. The program is responsible 
for the Submarine Force's Technology Insertion [TI] and 
Advanced Processor Build [APB] modernization process. This 
program continues to be a model of efficient, effective, and 
rapid response to submarine warfighter combat system, sonar, 
and imaging needs. This program utilizes a flexible and 
forward-thinking methodology which enables the rapid 
introduction of fleet requirements and capability via an 
alternating biannual hardware and software modernization 
process which facilitates a stable industrial base. The TI/APB 
modernization process provides the submarine force with 
enhanced warfighting capabilities while avoiding significant 
research, design, acquisition, obsolescence, and training costs 
by transitioning three classes of attack submarines and the 
four guided missile submarines to a common baseline.

                       Procurement, Marine Corps

Appropriations, 2012....................................  $1,422,570,000
Budget estimate, 2013...................................   1,622,955,000
House allowance.........................................   1,482,081,000
Committee recommendation................................   1,334,448,000

    The Committee recommends an appropriation of 
$1,334,448,000. This is $288,507,000 below the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                                     [Dollars in thousands]
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                                     Change from               Change from
Line                            Item                              Qty.     2013 budget      Qty.   House allowance    Qty.      Committee    ---------------------------------------------------
                                                                             estimate                                         recommendation    Qty.   Budget estimate    Qty.   House allowance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                    PROCUREMENT, MARINE CORPS

     WEAPONS AND COMBAT VEHICLES

     TRACKED COMBAT VEHICLES
   1 AAV7A1 PIP                                               .......          $16,089  .......          $16,089  .......          $16,089  .......  ...............  .......  ...............
   2 LAV PIP                                                  .......          186,216  .......           45,342  .......           45,342  .......        -$140,874  .......  ...............

     ARTILLERY AND OTHER WEAPONS
   3 EXPEDITIONARY FIRE SUPPORT SYSTEM                        .......            2,502        7            2,502  .......            2,502  .......  ...............       -7  ...............
   4 155MM LIGHTWEIGHT TOWED HOWITZER                         .......           17,913  .......           17,913  .......           17,913  .......  ...............  .......  ...............
   5 HIGH MOBILITY ARTILLERY ROCKET SYSTEM                    .......           47,999  .......           47,999  .......            7,107  .......          -40,892  .......         -$40,892
   6 WEAPONS AND COMBAT VEHICLES UNDER $5 MILLION             .......           17,706  .......           17,706  .......            2,298  .......          -15,408  .......          -15,408

     OTHER SUPPORT
   7 MODIFICATION KITS                                        .......           48,040  .......           48,040  .......           34,145  .......          -13,895  .......          -13,895
   8 WEAPONS ENHANCEMENT PROGRAM                              .......            4,537  .......            4,537  .......            4,537  .......  ...............  .......  ...............
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, WEAPONS AND COMBAT VEHICLES                 .......          341,002  .......          200,128  .......          129,933  .......         -211,069  .......          -70,195

     GUIDED MISSILES AND EQUIPMENT

     GUIDED MISSILES
   9 GROUND BASED AIR DEFENSE                                 .......           11,054  .......           11,054  .......           11,054  .......  ...............  .......  ...............
  11 FOLLOW ON TO SMAW                                        .......           19,650  .......           19,650  .......           19,650  .......  ...............  .......  ...............
  12 ANTI-ARMOR WEAPONS SYSTEM-HEAVY [AAWS-H]                 .......           20,708  .......           20,708  .......           20,162  .......             -546  .......             -546

     OTHER SUPPORT

                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, GUIDED MISSILES AND EQUIPMENT               .......           51,412  .......           51,412  .......           50,866  .......             -546  .......             -546

     COMMUNICATIONS AND ELECTRONICS EQUIPMENT

     COMMAND AND CONTROL SYSTEMS
  14 COMBAT OPERATIONS CENTER                                 .......            1,420  .......            1,420  .......            1,420  .......  ...............  .......  ...............

     REPAIR AND TEST EQUIPMENT
  15 REPAIR AND TEST EQUIPMENT                                .......           25,127  .......           25,127  .......           25,127  .......  ...............  .......  ...............

     OTHER SUPPORT (TEL)
  16 COMBAT SUPPORT SYSTEM                                    .......           25,822  .......           25,822  .......           19,822  .......           -6,000  .......           -6,000
  17 MODIFICATION KITS                                        .......            2,831  .......            2,831  .......            2,831  .......  ...............  .......  ...............

     COMMAND AND CONTROL
  18 ITEMS UNDER $5 MILLION (COMM & ELEC)                     .......            5,498  .......            5,498  .......            5,498  .......  ...............  .......  ...............
  19 AIR OPERATIONS C2 SYSTEMS                                .......           11,290  .......           11,290  .......           11,290  .......  ...............  .......  ...............

     RADAR + EQUIPMENT (NON-TEL)
  20 RADAR SYSTEMS                                            .......          128,079  .......          128,079  .......          128,079  .......  ...............  .......  ...............
  21 RQ-21 UAS                                                      5           27,619  .......           27,619  .......  ...............       -5          -27,619  .......          -27,619

     INTELL/COMM EQUIPMENT (NON-TEL)
  22 FIRE SUPPORT SYSTEM                                      .......            7,319  .......            7,319  .......            7,319  .......  ...............  .......  ...............
  23 INTELLIGENCE SUPPORT EQUIPMENT                           .......            7,466  .......            7,466  .......            7,466  .......  ...............  .......  ...............
  25 RQ-11 UAV                                                .......            2,318  .......            2,318  .......            2,318  .......  ...............  .......  ...............
  26 DCGS-MC                                                  .......           18,291  .......           18,291  .......           12,291  .......           -6,000  .......           -6,000

     OTHER COMM/ELEC EQUIPMENT (NON-TEL)
  29 NIGHT VISION EQUIPMENT                                   .......           48,084  .......           48,084  .......           43,884  .......           -4,200  .......           -4,200

     OTHER SUPPORT (NON-TEL)
  30 COMMON COMPUTER RESOURCES                                .......          206,708  .......          206,708  .......          206,708  .......  ...............  .......  ...............
  31 COMMAND POST SYSTEMS                                     .......           35,190  .......           35,190  .......           35,190  .......  ...............  .......  ...............
  32 RADIO SYSTEMS                                            .......           89,059  .......           89,059  .......           89,059  .......  ...............  .......  ...............
  33 COMM SWITCHING & CONTROL SYSTEMS                         .......           22,500  .......           22,500  .......           22,500  .......  ...............  .......  ...............
  34 COMM & ELEC INFRASTRUCTURE SUPPORT                       .......           42,625  .......           42,625  .......           42,625  .......  ...............  .......  ...............
     CLASSIFIED PROGRAMS                                      .......            2,290  .......            2,290  .......            2,290  .......  ...............  .......  ...............
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, COMMUNICATIONS AND ELECTRONICS EQUIPMENT    .......          709,536  .......          709,536  .......          665,717  .......          -43,819  .......          -43,819

     SUPPORT VEHICLES

     ADMINISTRATIVE VEHICLES
  35 COMMERCIAL PASSENGER VEHICLES                            .......            2,877  .......            2,877  .......            2,877  .......  ...............  .......  ...............
  36 COMMERCIAL CARGO VEHICLES                                .......           13,960  .......           13,960  .......           13,960  .......  ...............  .......  ...............

     TACTICAL VEHICLES
  37 5/4T TRUCK HMMWV (MYP)                                   .......            8,052  .......            8,052  .......            8,052  .......  ...............  .......  ...............
  38 MOTOR TRANSPORT MODIFICATIONS                            .......           50,269  .......           50,269  .......           50,269  .......  ...............  .......  ...............
  40 LOGISTICS VEHICLE SYSTEM REP                                   8           37,262        8           37,262  .......           33,962       -8           -3,300       -8           -3,300
  41 FAMILY OF TACTICAL TRAILERS                              .......           48,160  .......           48,160  .......           48,160  .......  ...............  .......  ...............

     OTHER SUPPORT
  43 ITEMS LESS THAN $5 MILLION                               .......            6,705  .......            6,705  .......            6,705  .......  ...............  .......  ...............
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, SUPPORT VEHICLES                            .......          167,285  .......          167,285  .......          163,985  .......           -3,300  .......           -3,300

     ENGINEER AND OTHER EQUIPMENT

     ENGINEER AND OTHER EQUIPMENT
  44 ENVIRONMENTAL CONTROL EQUIP ASSORT                       .......           13,576  .......           13,576  .......           13,576  .......  ...............  .......  ...............
  45 BULK LIQUID EQUIPMENT                                    .......           16,869  .......           16,869  .......           16,869  .......  ...............  .......  ...............
  46 TACTICAL FUEL SYSTEMS                                    .......           19,108  .......           19,108  .......           19,108  .......  ...............  .......  ...............
  47 POWER EQUIPMENT ASSORTED                                 .......           56,253  .......           56,253  .......           26,480  .......          -29,773  .......          -29,773
  48 AMPHIBIOUS SUPPORT EQUIPMENT                             .......           13,089  .......           13,089  .......           13,089  .......  ...............  .......  ...............
  49 EOD SYSTEMS                                              .......           73,699  .......           73,699  .......           73,699  .......  ...............  .......  ...............

     MATERIALS HANDLING EQUIPMENT
  50 PHYSICAL SECURITY EQUIPMENT                              .......            3,510  .......            3,510  .......            3,510  .......  ...............  .......  ...............
  51 GARRISON MOBILE ENGR EQUIP                               .......           11,490  .......           11,490  .......           11,490  .......  ...............  .......  ...............
  52 MATERIAL HANDLING EQUIP                                  .......           20,659  .......           20,659  .......           20,659  .......  ...............  .......  ...............
  53 FIRST DESTINATION TRANSPORTATION                         .......              132  .......              132  .......              132  .......  ...............  .......  ...............

     GENERAL PROPERTY
  54 FIELD MEDICAL EQUIPMENT                                  .......           31,068  .......           31,068  .......           31,068  .......  ...............  .......  ...............
  55 TRAINING DEVICES                                         .......           45,895  .......           45,895  .......           45,895  .......  ...............  .......  ...............
  56 CONTAINER FAMILY                                         .......            5,801  .......            5,801  .......            5,801  .......  ...............  .......  ...............
  57 FAMILY OF CONSTRUCTION EQUIPMENT                         .......           23,939  .......           23,939  .......           23,939  .......  ...............  .......  ...............
  60 RAPID DEPLOYABLE KITCHEN                                 .......            8,365  .......            8,365  .......            8,365  .......  ...............  .......  ...............

     OTHER SUPPORT
  61 ITEMS LESS THAN $5 MILLION                               .......            7,077  .......            7,077  .......            7,077  .......  ...............  .......  ...............
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, ENGINEER AND OTHER EQUIPMENT                .......          350,530  .......          350,530  .......          320,757  .......          -29,773  .......          -29,773
  62 SPARES AND REPAIR PARTS                                  .......            3,190  .......            3,190  .......            3,190  .......  ...............  .......  ...............
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, PROCUREMENT, MARINE CORPS                   .......        1,622,955  .......        1,482,081  .......        1,334,448  .......         -288,507  .......         -147,633
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
     2 LAV PIP                 186,216          45,342        -140,874
           Marine       ..............  ..............        -140,874
            Corps
            Requested
            Transfer
            to Title
            I:
            Military
            Personnel,
            Marine
            Corps and
            Title II:
            Operation
            and
            Maintenanc
            e, Marine
            Corps
     5 High Mobility            47,999           7,107         -40,892
        Artillery
        Rocket System
           Marine       ..............  ..............         -40,892
            Corps
            Requested
            Transfer
            to Title
            IX:
            Aircraft
            Procuremen
            t, Navy
     6 Weapons and              17,706           2,298         -15,408
        Combat
        Vehicles Under
        $5,000,000
           CQBP         ..............  ..............         -11,124
            Transfer
            to Title
            IX
           Scout        ..............  ..............          -4,284
            Sniper
            Excess to
            Requiremen
            t
     7 Modification             48,040          34,145         -13,895
        Kits
           Abrams       ..............  ..............         -13,895
            Suspension
            Unit Cost
            Growth
    12 Anti-Armor               20,708          20,162            -546
        Weapons
        System--Heavy
        [AAWS-H]
           Unit Cost    ..............  ..............            -546
            Growth
    16 Combat Support           25,822          19,822          -6,000
        System
           GCSS         ..............  ..............          -6,000
            Program
            Delay
    21 RQ-21 UAS                27,619  ..............         -27,619
           Program      ..............  ..............         -27,619
            Adjustment
    26 DCGS-MC                  18,291          12,291          -6,000
           Prior Year   ..............  ..............          -6,000
            Unobligate
            d Balances
    29 Night Vision             48,084          43,884          -4,200
        Equipment
           Squad        ..............  ..............          -4,200
            Thermal
            System--Pr
            ogram
            Delay
    40 Logistics                37,262          33,962          -3,300
        Vehicle System
        Rep
           Transfer to  ..............  ..............          -3,300
            Title IX
    47 Power Equipment          56,253          26,480         -29,773
        Assorted
           APSCE and    ..............  ..............         -29,773
            MEPDIS-R
            Transfer
            to Title
            IX
------------------------------------------------------------------------

                    Aircraft Procurement, Air Force

Appropriations, 2012.................................... $12,950,000,000
Budget estimate, 2013...................................  11,002,999,000
House allowance.........................................  11,320,899,000
Committee recommendation................................  11,260,646,000

    The Committee recommends an appropriation of 
$11,260,646,000. This is $257,647,000 above the budget 
estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                                     [Dollars in thousands]
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                                     Change from               Change from
Line                            Item                              Qty.     2013 budget      Qty.   House allowance    Qty.      Committee    ---------------------------------------------------
                                                                             estimate                                         recommendation    Qty.   Budget estimate    Qty.   House allowance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                 AIRCRAFT PROCUREMENT, AIR FORCE

     COMBAT AIRCRAFT

     TACTICAL FORCES
   1 F-35                                                          19       $3,124,302       19       $2,951,002       19       $3,124,302  .......  ...............  .......        +$173,300
   2 F-35 (AP-CY)                                             .......          293,400  .......          293,400  .......          293,400  .......  ...............  .......  ...............
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, COMBAT AIRCRAFT                             .......        3,417,702  .......        3,244,402  .......        3,417,702  .......  ...............  .......         +173,300

     OTHER AIRLIFT
   5 C-130J                                                   .......           68,373        1          123,373  .......           68,373  .......  ...............       -1          -55,000
   6 C-130J ADVANCE PROCUREMENT (CY)                          .......  ...............  .......  ...............       18          180,000      +18        +$180,000      +18         +180,000
   7 HC-130J                                                        1          152,212        3          278,212        1          152,212  .......  ...............       -2         -126,000
   9 MC-130J                                                        4          374,866        6          500,866        4          374,866  .......  ...............       -2         -126,000
  12 JOINT CARGO AIRCRAFT                                     .......  ...............  .......          115,000  .......          137,863  .......         +137,863  .......          +22,863
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, OTHER AIRLIFT                               .......          595,451  .......        1,017,451  .......          913,314  .......         +317,863  .......         -104,137

     OTHER AIRCRAFT
  15 HH-60 LOSS REPLACEMENT/RECAP                             .......           60,596  .......           60,596  .......           57,396  .......           -3,200  .......           -3,200
  17 V-22 OSPREY                                                    4          294,220        4          294,220        4          294,220  .......  ...............  .......  ...............
  18 V-22 OSPREY (AP-CY)                                      .......           15,000  .......           15,000  .......           15,000  .......  ...............  .......  ...............

     MISSION SUPPORT AIRCRAFT
  19 CIVIL AIR PATROL A/C                                           5            2,498        5            9,298        5            9,298  .......           +6,800  .......  ...............

     OTHER AIRCRAFT
  24 TARGET DRONES                                                 15          129,866       15          129,866       15          129,866  .......  ...............  .......  ...............
  26 RQ-4 UAV                                                 .......           75,000  .......          182,000  .......           75,000  .......  ...............  .......         -107,000
  28 AC-130J                                                        2          163,970        2          163,970        2          163,970  .......  ...............  .......  ...............
  30 MQ-9                                                          24          553,530       36          708,530       24          527,430  .......          -26,100      -12         -181,100
  31 RQ-4 BLOCK
  40 PROC                                                     .......           11,654  .......           11,654  .......           11,654  .......  ...............  .......  ...............
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, OTHER AIRCRAFT                              .......        1,306,334  .......        1,575,134  .......        1,283,834  .......          -22,500  .......         -291,300

     MODIFICATION OF INSERVICE AIRCRAFT

     STRATEGIC AIRCRAFT
  32 B-2A                                                     .......           82,296  .......           82,296  .......           82,296  .......  ...............  .......  ...............
  33 B-1B                                                     .......          149,756  .......          149,756  .......          149,756  .......  ...............  .......  ...............
  34 B-52                                                     .......            9,781  .......            9,781  .......            9,781  .......  ...............  .......  ...............
  35 LARGE AIRCRAFT INFRARED COUNTERMEASURES                  .......           28,800  .......           28,800  .......           28,800  .......  ...............  .......  ...............

     TACTICAL AIRCRAFT
  36 A-10                                                     .......           89,919  .......           89,919  .......          251,119  .......         +161,200  .......         +161,200
  37 F-15                                                     .......          148,378  .......          148,378  .......          210,878  .......          +62,500  .......          +62,500
  38 F-16                                                     .......            6,896  .......            6,896  .......            6,896  .......  ...............  .......  ...............
  39 F-22A                                                    .......          283,871  .......          333,871  .......          288,271  .......           +4,400  .......          -45,600
  40 F-35 MODIFICATIONS                                       .......          147,995  .......           30,195  .......          147,995  .......  ...............  .......         +117,800

     AIRLIFT AIRCRAFT
  41 C-5                                                      .......            6,967  .......            6,967  .......            6,967  .......  ...............  .......  ...............
  43 C-5M                                                     .......          944,819  .......          870,819  .......          879,819  .......          -65,000  .......           +9,000
  44 C-5M (AP-CY)                                             .......          175,800  .......          175,800  .......          175,800  .......  ...............  .......  ...............
  46 C-17A                                                    .......          205,079  .......          205,079  .......          205,079  .......  ...............  .......  ...............
  47 C-21                                                     .......              199  .......              199  .......              199  .......  ...............  .......  ...............
  48 C-32A                                                    .......            1,750  .......            1,750  .......            1,750  .......  ...............  .......  ...............
  49 C-37A                                                    .......              445  .......              445  .......              445  .......  ...............  .......  ...............
  50 C-130 AMP                                                .......  ...............  .......           10,000  .......  ...............  .......  ...............  .......          -10,000

     TRAINER AIRCRAFT
  51 GLIDER MODS                                              .......              126  .......              126  .......              126  .......  ...............  .......  ...............
  52 T6                                                       .......           15,494  .......           15,494  .......           15,494  .......  ...............  .......  ...............
  53 T-1                                                      .......              272  .......              272  .......              272  .......  ...............  .......  ...............
  54 T-38                                                     .......           20,455  .......           20,455  .......           20,455  .......  ...............  .......  ...............

     OTHER AIRCRAFT
  56 U-2 MODS                                                 .......           44,477  .......           44,477  .......           44,477  .......  ...............  .......  ...............
  57 KC-10A (ATCA)                                            .......           46,921  .......           46,921  .......            8,000  .......          -38,921  .......          -38,921
  58 C-12                                                     .......            1,876  .......            1,876  .......            1,876  .......  ...............  .......  ...............
  59 MC-12W                                                   .......           17,054  .......           17,054  .......           17,054  .......  ...............  .......  ...............
  60 C-20 MODS                                                .......              243  .......              243  .......              243  .......  ...............  .......  ...............
  61 VC-25A MOD                                               .......           11,185  .......           11,185  .......           11,185  .......  ...............  .......  ...............
  62 C-40                                                     .......              243  .......              243  .......              243  .......  ...............  .......  ...............
  63 C-130                                                    .......           67,853  .......           67,853  .......           67,853  .......  ...............  .......  ...............
  65 C130J MODS                                               .......           70,555  .......           70,555  .......           70,555  .......  ...............  .......  ...............
  66 C-135                                                    .......           46,707  .......           62,707  .......           46,707  .......  ...............  .......          -16,000
  67 COMPASS CALL MODS                                        .......           50,024  .......           50,024  .......           50,024  .......  ...............  .......  ...............
  68 RC-135                                                   .......          165,237  .......          165,237  .......          165,237  .......  ...............  .......  ...............
  69 E-3                                                      .......          193,099  .......          193,099  .......          169,599  .......          -23,500  .......          -23,500
  70 E-4                                                      .......           47,616  .......           47,616  .......           47,616  .......  ...............  .......  ...............
  71 E-8                                                      .......           59,320  .......           49,020  .......           59,320  .......  ...............  .......          +10,300
  72 H-1                                                      .......            5,449  .......            5,449  .......            5,449  .......  ...............  .......  ...............
  73 H-60                                                     .......           26,227  .......           26,227  .......           26,227  .......  ...............  .......  ...............
  74 RQ-4 UAV MODS                                            .......            9,257  .......            9,257  .......            7,757  .......           -1,500  .......           -1,500
  75 HC/MC-130 MODIFICATIONS                                  .......           22,326  .......           22,326  .......           22,326  .......  ...............  .......  ...............
  76 OTHER AIRCRAFT                                           .......           18,832  .......           18,832  .......           18,832  .......  ...............  .......  ...............
  77 MQ-1 MODS                                                .......           30,861  .......           30,861  .......           30,861  .......  ...............  .......  ...............
  78 MQ-9 MODS                                                .......          238,360  .......          210,960  .......          217,360  .......          -21,000  .......           +6,400
  79 MQ-9 PAYLOAD--UAS                                        .......           93,461  .......           93,461  .......           93,461  .......  ...............  .......  ...............
  80 CV-22 MODS                                               .......           23,881  .......           23,881  .......           23,881  .......  ...............  .......  ...............
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, MODIFICATION OF INSERVICE AIRCRAFT          .......        3,610,162  .......        3,456,662  .......        3,688,341  .......          +78,179  .......         +231,679

     AIRCRAFT SPARES AND REPAIR PARTS
  81 INITIAL SPARES/REPAIR PARTS                              .......          729,691  .......          679,691  .......          736,269  .......           +6,578  .......          +56,578
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, AIRCRAFT SPARES AND REPAIR PARTS            .......          729,691  .......          679,691  .......          736,269  .......           +6,578  .......          +56,578

     AIRCRAFT SUPPORT EQUIPMENT AND FACILITIES

     COMMON SUPPORT EQUIPMENT
  82 AIRCRAFT REPLACEMENT SUPPORT EQUIP                       .......           56,542  .......           56,542  .......           56,542  .......  ...............  .......  ...............

     POST PRODUCTION SUPPORT
  83 A-10                                                     .......            5,100  .......            5,100  .......            5,100  .......  ...............  .......  ...............
  84 B-1                                                      .......              965  .......              965  .......              965  .......  ...............  .......  ...............
  86 B-2A                                                     .......           47,580  .......           47,580  .......           47,580  .......  ...............  .......  ...............
  88 KC-10A (ATCA)                                            .......           13,100  .......           13,100  .......           13,100  .......  ...............  .......  ...............
  89 C-17A                                                    .......          181,703  .......          181,703  .......          181,703  .......  ...............  .......  ...............
  90 C-130                                                    .......           31,830  .......           31,830  .......           31,830  .......  ...............  .......  ...............
  91 C-135                                                    .......           13,434  .......           13,434  .......           13,434  .......  ...............  .......  ...............
  92 F-15 POST PRODUCTION SUPPORT                             .......            2,363  .......            2,363  .......            2,363  .......  ...............  .......  ...............
  93 F-16 POST PRODUCTION SUPPORT                             .......            8,506  .......            5,906  .......            5,360  .......           -3,146  .......             -546
  96 OTHER AIRCRAFT                                           .......            9,522  .......               22  .......            9,522  .......  ...............  .......           +9,500

     INDUSTRIAL PREPAREDNESS
  97 INDUSTRIAL PREPAREDNESS                                  .......           20,731  .......           20,731  .......           20,731  .......  ...............  .......  ...............

     WAR CONSUMABLES
  98 WAR CONSUMABLES                                          .......           89,727  .......           89,727  .......  ...............  .......          -89,727  .......          -89,727

     OTHER PRODUCTION CHARGES
 100 OTHER PRODUCTION CHARGES                                 .......          842,392  .......          842,392  .......          812,792  .......          -29,600  .......          -29,600
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, AIRCRAFT SUPPORT EQUIPMENT AND FACILITIES.  .......        1,323,495  .......        1,311,395  .......        1,201,022  .......         -122,473  .......         -110,373

     AERIAL DISPERSAL UNITS (HOUSE)                           .......  ...............  .......           16,000  .......  ...............  .......  ...............  .......          -16,000
     CLASSIFIED PROGRAMS                                      .......           20,164  .......           20,164  .......           20,164  .......  ...............  .......  ...............
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, AIRCRAFT PROCUREMENT, AIR FORCE             .......       11,002,999  .......       11,320,899  .......       11,260,646  .......         +257,647  .......          -60,253
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                                                    Change from
 Line                             Item                              2013 budget      Committee        budget
                                                                     estimate     recommendation     estimate
----------------------------------------------------------------------------------------------------------------
    6 C-130J (AP)                                               ..............         180,000        +180,000
          Unfunded requirement for advance procurement for 18   ..............  ..............        +180,000
           C/HC/MC/AC-130Js
   12 C-27J                                                     ..............         137,863        +137,863
          Retain C-27J force structure                          ..............  ..............        +137,863
   15 HH-60 Loss Replacement/RECAP                                      60,596          57,396          -3,200
          Interim contractor support--forward financing         ..............  ..............          -3,200
   19 Civil Air Patrol A/C                                               2,498           9,298          +6,800
          Program increase                                      ..............  ..............          +6,800
   30 MQ-9                                                             553,530         527,430         -26,100
          Block 50 GCS--program adjustment                      ..............  ..............         -26,100
   36 A-10                                                              89,919         251,119        +161,200
          Retain A-10 force structure                           ..............  ..............        +161,200
   37 F-15                                                             148,378         210,878         +62,500
          AESA radars for ANG F-15s--level production rates     ..............  ..............         +62,500
   39 F-22A                                                            283,871         288,271          +4,400
          Engine modifications--excessive cost growth           ..............  ..............         -17,100
          Backup oxygen system                                  ..............  ..............         +21,500
   43 C-5M                                                           1,057,019         992,019         -65,000
          ECO--execution delays and excessive growth            ..............  ..............         -50,000
          Inflation adjustment                                  ..............  ..............         -15,000
   57 KC-10A [ATCA]                                                     46,921           8,000         -38,921
          CNS/ATM--funds requested early to need                ..............  ..............         -38,921
   69 E-3                                                              193,099         169,599         -23,500
          Block 40/45--reduce one shipset                       ..............  ..............         -17,300
          NGIFF--excessive unit cost growth                     ..............  ..............          -6,200
   74 RQ-4 Mods                                                          9,257           7,757          -1,500
          Lack of requirement                                   ..............  ..............          -1,500
   78 MQ-9 Mods                                                        238,360         217,360         -21,000
          GCS Block 50--unsustained ramp                        ..............  ..............         -21,000
   81 Initial Spares/Repair Parts                                      729,691         736,269          +6,578
          C-27 spares--retain force structure                   ..............  ..............         +51,978
          CV-22 spares--unexecutable growth                     ..............  ..............         -45,400
   93 F-16                                                               8,506           5,360          -3,146
          Production line shutdown--excess to need              ..............  ..............          -3,146
   98 War Consumables                                                   89,727  ..............         -89,727
          Transfer to Title IX                                  ..............  ..............         -89,727
   99 Other Production Charges                                         842,392         812,792         -29,600
----------------------------------------------------------------------------------------------------------------

    F-22 Automatic Backup Oxygen System [ABOS].--The fiscal 
year 2013 budget request includes no funds for the F-22 ABOS. 
The Committee notes that following submission of the fiscal 
year 2013 budget request, the Air Force was directed by the 
Secretary of Defense to take additional measures to ensure the 
health and safety of the airmen and maintainers operating the 
F-22, to include expediting the installation of an automatic 
backup oxygen system. The Committee understands that the fiscal 
year 2013 funding requirement for the procurement of ABOS is 
$21,500,000 and that the Air Force intends to defer other, 
previously funded critical reliability improvements to the F-22 
in order to accelerate the procurement and installation of 
ABOS. The Committee does not agree with this strategy and 
recommends an additional $21,500,000 in fiscal year 2013 to 
execute the accelerated ABOS schedule without negatively 
impacting other reliability projects.
    C-130J Advance Procurement.--The fiscal year 2013 budget 
request includes no Advance Procurement funding in Aircraft 
Procurement, Air Force, for C-130J aircraft that will be 
procured in fiscal year 2014. As previously stated in Senate 
Report 112-77, the Committee is concerned that the lack of 
advance procurement funding will cause a negative production 
impact that will result in delays of future aircraft 
deliveries. The Committee notes that the Marine Corps has 
included Advance Procurement funding in the fiscal year 2013 
budget request for C-130Js planned for procurement by the 
Marine Corps in fiscal year 2014. The Committee recommends 
$180,000,000 in Aircraft Procurement, Air Force for Advance 
Procurement of no less than 18 C-130Js to be procured by the 
Air Force in fiscal year 2014.
    U-2 Sensors.--The Committee notes that funds appropriated 
in prior years for U-2 sensors and sensor upgrades have not 
been obligated due to pending force structure decisions. The 
Committee sees no reason to delay the procurement of U-2 
sensors and upgrades and directs the Air Force to obligate 
fiscal year 2011 and fiscal year 2012 funds for the U-2 for the 
purpose for which they were appropriated.
    Operational Support Aircraft.--Senate Report 112-77 to 
accompany Public Law 112-74, the Department of Defense 
Appropriations Act for Fiscal Year 2012, expressed support for 
the Air Force 2010 Air Mobility Master Plan which called for 
replacement of C-20B aircraft with C-37Bs. To ensure an orderly 
transition for enactment of this plan, the Committee directs 
the Secretary of the Air Force to submit a detailed plan with 
the fiscal year 2014 budget submission that provides both 
schedule and budget data for acquisition of the C-37Bs.
    Spare Engines.--The Committee understands that the Air 
Force has a shortfall of spare engines for F-15E and F-16 
aircraft. The Committee encourages the Air Force to fully fund 
this requirement.

                     Missile Procurement, Air Force

Appropriations, 2012....................................  $6,080,877,000
Budget estimate, 2013...................................   5,491,846,000
House allowance.........................................   5,449,146,000
Committee recommendation................................   4,913,276,000

    The Committee recommends an appropriation of 
$4,913,276,000. This is $578,570,000 below the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                                     [Dollars in thousands]
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                                     Change from               Change from
Line                            Item                              Qty.     2013 budget      Qty.   House allowance    Qty.      Committee    ---------------------------------------------------
                                                                             estimate                                         recommendation    Qty.   Budget estimate    Qty.   House allowance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                  MISSILE PROCUREMENT, AIR FORCE

     BALLISTIC MISSILES

     MISSILE REPLACEMENT EQUIPMENT--BALLISTIC
   1 MISSILE REPLACEMENT EQ--BALLISTIC                        .......          $56,906  .......          $56,906  .......          $56,906  .......  ...............  .......  ...............

     OTHER MISSILES

     TACTICAL
   2 JASSM                                                        157          240,399      157          240,399      157          240,399  .......  ...............  .......  ...............
   3 SIDEWINDER (AIM-9X)                                          164           88,020      164           88,020      164           81,550  .......          -$6,470  .......          -$6,470
   4 AMRAAM                                                       113          229,637      113          206,937      113          201,637  .......          -28,000  .......           -5,300
   5 PREDATOR HELLFIRE MISSILE                                    413           47,675      413           47,675      413           47,675  .......  ...............  .......  ...............
   6 SMALL DIAMETER BOMB                                          144           42,000      144           42,000  .......            2,000     -144          -40,000     -144          -40,000

     INDUSTRIAL FACILITIES
   7 INDUSTRIAL PREPAREDNESS/POLLUTION PREVENTION             .......              744  .......              744  .......              744  .......  ...............  .......  ...............
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, OTHER MISSILES                              .......          648,475  .......          625,775  .......          574,005  .......          -74,470  .......          -51,770

     MODIFICATION OF INSERVICE MISSILES

     CLASS IV
   9 MM III MODIFICATIONS                                     .......           54,794  .......           54,794  .......           54,794  .......  ...............  .......  ...............
  10 AGM-65D MAVERICK                                         .......              271  .......              271  .......              271  .......  ...............  .......  ...............
  11 AGM-88A HARM                                             .......           23,240  .......           23,240  .......           23,240  .......  ...............  .......  ...............
  12 AIR LAUNCH CRUISE MISSILE                                .......           13,620  .......           13,620  .......           13,620  .......  ...............  .......  ...............
  13 SMALL DIAMETER BOMB                                      .......            5,000  .......            5,000  .......            5,000  .......  ...............  .......  ...............
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, MODIFICATION OF INSERVICE MISSILES          .......           96,925  .......           96,925  .......           96,925  .......  ...............  .......

     SPARES AND REPAIR PARTS
  14 INITIAL SPARES/REPAIR PARTS                              .......           74,373  .......           74,373  .......           74,373  .......  ...............  .......  ...............

     OTHER SUPPORT

     SPACE PROGRAMS
  15 ADVANCED EHF                                             .......          557,205  .......          547,205  .......          463,205  .......          -94,000  .......          -84,000
  17 WIDEBAND GAPFILLER SATELLITES                            .......           36,835  .......           36,835  .......           36,835  .......  ...............  .......  ...............
  19 GPS III SPACE SEGMENT                                          2          410,294        2          410,294        2          410,294  .......  ...............  .......  ...............
  20 GPS III SPACE SEGMENT (AP-CY)                            .......           82,616  .......           82,616  .......           82,616  .......  ...............  .......  ...............
  21 SPACEBORNE EQUIP (COMSEC)                                .......           10,554  .......           10,554  .......           10,554  .......  ...............  .......  ...............
  22 GLOBAL POSITIONING (SPACE)                               .......           58,147  .......           48,147  .......           58,147  .......  ...............  .......          +10,000
  23 DEF METEOROLOGICAL SAT PROG (SPACE)                      .......           89,022  .......           89,022  .......           89,022  .......  ...............  .......  ...............
  24 EVOLVED EXPENDABLE LAUNCH VEH (SPACE)                          4        1,679,856        4        1,679,856        4          805,250  .......         -874,606  .......         -874,606
     EVOLVED EXPENDABLE LAUNCH VEH INFRASTRUCTURE (SPACE)     .......  ...............  .......  ...............  .......          654,606  .......         +654,606  .......         +654,606
  25 SBIR HIGH (SPACE)                                              2          454,251        2          454,251        2          378,651  .......          -75,600  .......          -75,600

     SPECIAL PROGRAMS
  30 SPECIAL UPDATE PROGRAMS                                  .......          138,904  .......          138,904  .......          138,904  .......  ...............  .......  ...............
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, OTHER SUPPORT                               .......        3,517,684  .......        3,497,684  .......        3,128,084  .......         -389,600  .......         -369,600

     CLASSIFIED PROGRAMS                                      .......        1,097,483  .......        1,097,483  .......          982,983  .......         -114,500  .......         -114,500
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, MISSILE PROCUREMENT, AIR FORCE              .......        5,491,846  .......        5,449,146  .......        4,913,276  .......         -578,570  .......         -535,870
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                            2013 budget      Committee      Change from
 Line         Item           estimate     recommendation  budget request
------------------------------------------------------------------------
    3 Sidewinder (AIM-          88,020          81,550          -6,470
       9X)
          All Up Round  ..............  ..............          -4,530
           Missile
           Cost Growth
          Captive Air   ..............  ..............          -1,940
           Training
           Missile
           Cost Growth
    4 AMRAAM                   229,637         201,637         -28,000
          All Up Round  ..............  ..............         -17,000
           Missile
           Cost Growth
          Captive Air   ..............  ..............         -11,000
           Training
           Missile
           Cost Growth
    6 Small Diameter            42,000           2,000         -40,000
       Bomb
          Delay         ..............  ..............         -40,000
           Procurement
           by One Year
   15 Advanced EHF             557,205         463,205         -94,000
          Schedule      ..............  ..............         -94,000
           Delay Due
           to Late AP
           Award
   24 Evolved                1,679,856         805,250        -874,606
       Expendable
       Launch Vehicle
       (Space)
          Transfer      ..............  ..............        -874,606
           EELV Launch
           Capability
           to line 24a
  24a Evolved           ..............         654,606        +654,606
       Expendable
       Launch Vehicle
       Infrastructure
       (Space)
          Transfer      ..............  ..............        +874,606
           EELV Launch
           Capability
           from line
           24
          EELV Launch   ..............  ..............        -220,000
           Capability
           Contract
           Savings
   25 SBIR High                454,251         378,651         -75,600
       (Space)
          Schedule      ..............  ..............         -75,600
           Delay Due
           to Late AP
           Award
  999 Classified             1,097,483         982,983        -114,500
       Programs
          Classified    ..............  ..............        -114,500
           Adjustment
------------------------------------------------------------------------

    Small Diameter Bomb Increment II [SDB II].--The Committee 
recommends no procurement funds for SDB II in fiscal year 2013. 
The request to start production in fiscal year 2013 is 
premature due to significant testing that remains to be 
completed and delays in the Joint Strike Fighter [JSF] 
development program.
    The SDB II program began its test phase in spring 2012 and 
is scheduled to conduct 11 free-flight tests prior to obtaining 
production approval. These tests are not scheduled to complete 
until the end of fiscal year 2013. Furthermore, SDB II must be 
integrated on both the F-15E and F-35B/C Joint Strike Fighter 
aircraft before it is able to enter full rate production. SDB 
II integration on the JSF is not scheduled to begin until 
fiscal year 2017, with operational testing scheduled to 
complete in 2020. According to the Air Force, the current 
acquisition strategy will require eight lots of low rate 
initial production to accommodate F-35B/C schedule delays, 
which will result in higher unit costs for an extended period 
of time.
    The Committee remains supportive of the capability of this 
weapon, and fully funds the research and development of this 
program in fiscal year 2013. The Committee recommends the 
Department of the Air Force modify its acquisition strategy to 
align with F-15E and JSF integration and consider an optimal 
production rate that minimizes individual unit costs.
    Advanced Extremely High Frequency [AEHF] and Space Based 
Infrared System [SBIRS].--Beginning in fiscal year 2012, 
Congress directed incremental funding for the AEHF and SBIRS 
programs. In an effort to gain efficiencies from a combined buy 
of certain long-lead materials, the Air Force has delayed the 
contract awards for AEHF 5 and 6 and SBIRS GEO 5 and 6 until 
late in fiscal year 2012. The Committee commends the Air Force 
for its flexibility and ingenuity in looking across its 
acquisition portfolio to find efficiencies.
    However, due to the delay in contract awards, and the 
incremental funding strategy for both programs, funds that were 
expected to be expended in fiscal year 2012 will carry over 
into fiscal year 2013. The recommendation includes a reduction 
of $94,000,000 in AEHF procurement and $75,600,000 in SBIRS 
procurement due to the contract delays and the carryover of 
prior-year funds.
    Evolved Expendable Launch Vehicle.--The budget request 
includes $1,679,856,000 for the Evolved Expendable Launch 
Vehicle [EELV] program. The EELV program consists of EELV 
Launch Services, which funds the launch of Air Force 
satellites, and EELV Launch Capability, which maintains the 
engineering workforce and infrastructure needed for launch 
missions. In fiscal year 2012, the Air Force successfully 
negotiated substantial cost savings to the EELV Launch 
Capability contract. Savings from those negotiations are 
planned to be used to procure an additional Delta IV launch 
service.
    The Committee commends the Air Force and the contractor for 
identifying more than $219,000,000 in efficiencies in the 
current fiscal year and reinvesting the savings in a launch 
vehicle that was not included in the fiscal year 2012 budget 
request.
    However, because the fiscal year 2013 budget could not 
anticipate the savings coming out of these negotiations, the 
funds requested in the fiscal year 2013 budget are in excess of 
what will be required to sustain the EELV Launch Capability 
program. Therefore, the Committee recommends a reduction of 
$220,000,000 to the EELV Launch Capability program due to 
negotiated contract savings. The recommendation fully supports 
the request for four EELV Launch Services.
    In addition, the Committee recommends the separation of 
EELV Launch Services and EELV Launch Capability funds into 
separate procurement line items in order to increase the budget 
visibility of each program. The Committee directs the Secretary 
of the Air Force to provide for separate procurement line items 
for each program in future budget submissions.

                  Procurement of Ammunition, Air Force

Appropriations, 2012....................................    $499,185,000
Budget estimate, 2013...................................     599,194,000
House allowance.........................................     599,194,000
Committee recommendation................................     593,194,000

    The Committee recommends an appropriation of $593,194,000. 
This is $6,000,000 below the budget estimate.

                     committee recommended program

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                                     [Dollars in thousands]
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                                     Change from               Change from
Line                            Item                              Qty.     2013 budget      Qty.   House allowance    Qty.      Committee    ---------------------------------------------------
                                                                             estimate                                         recommendation    Qty.   Budget estimate    Qty.   House allowance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
               PROCUREMENT OF AMMUNITION, AIR FORCE

     PROCUREMENT OF AMMO, AIR FORCE
   1 ROCKETS                                                  .......           $8,927  .......           $8,927  .......           $8,927  .......  ...............  .......  ...............
   2 CARTRIDGES                                               .......          118,075  .......          118,075  .......          118,075  .......  ...............  .......  ...............

     BOMBS
   3 PRACTICE BOMBS                                           .......           32,393  .......           32,393  .......           31,893  .......            -$500  .......            -$500
   4 GENERAL PURPOSE BOMBS                                    .......          163,467  .......          163,467  .......          163,467  .......  ...............  .......  ...............
   5 JOINT DIRECT ATTACK MUNITION                               3,259          101,921    3,259          101,921    3,259          101,921  .......  ...............  .......  ...............

     FLARE, IR MJU-7B
   6 CAD/PAD                                                  .......           43,829  .......           43,829  .......           43,829  .......  ...............  .......  ...............
   7 EXPLOSIVE ORDINANCE DISPOSAL [EOD]                       .......            7,515  .......            7,515  .......            7,515  .......  ...............  .......  ...............
   8 SPARES AND REPAIR PARTS                                  .......            1,003  .......            1,003  .......            1,003  .......  ...............  .......  ...............
   9 MODIFICATIONS                                            .......            5,321  .......            5,321  .......            5,321  .......  ...............  .......  ...............
  10 ITEMS LESS THAN $5,000,000                               .......            5,066  .......            5,066  .......            5,066  .......  ...............  .......  ...............

     FUZES
  11 FLARES                                                   .......           46,010  .......           46,010  .......           46,010  .......  ...............  .......  ...............
  12 FUZES                                                    .......           36,444  .......           36,444  .......           36,444  .......  ...............  .......  ...............
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, PROCUREMENT OF AMMO, AIR FORCE              .......          569,971  .......          569,971  .......          569,471  .......             -500  .......             -500

     WEAPONS
  13 SMALL ARMS                                               .......           29,223  .......           29,223  .......           23,723  .......           -5,500  .......           -5,500
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, PROCUREMENT OF AMMUNITION, AIR FORCE        .......          599,194  .......          599,194  .......          593,194  .......           -6,000  .......           -6,000
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                 2013 budget       Committee       Change from
 Line                            Item                              estimate      recommendation   budget request
----------------------------------------------------------------------------------------------------------------
     3 Practice Bombs                                                 32,393           31,893             -500
           Pricing adjustment--MK-84 Inert                   ...............  ...............             -500
    13 Small Arms                                                     29,223           23,723           -5,500
           Pricing adjustment                                ...............  ...............           -5,500
----------------------------------------------------------------------------------------------------------------

                      Other Procurement, Air Force

Appropriations, 2012.................................... $17,403,564,000
Budget estimate, 2013...................................  16,720,848,000
House allowance.........................................  16,632,575,000
Committee recommendation................................  17,008,348,000

    The Committee recommends an appropriation of 
$17,008,348,000. This is $287,500,000 above the budget 
estimate.

                     committee recommended program

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                                     [Dollars in thousands]
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                                     Change from               Change from
Line                            Item                              Qty.     2013 budget      Qty.   House allowance    Qty.      Committee    ---------------------------------------------------
                                                                             estimate                                         recommendation    Qty.   Budget estimate    Qty.   House allowance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                   OTHER PROCUREMENT, AIR FORCE

     VEHICULAR EQUIPMENT

     PASSENGER CARRYING VEHICLES
   1 PASSENGER CARRYING VEHICLE                               .......           $1,905  .......           $1,905  .......           $1,905  .......  ...............  .......  ...............

     CARGO + UTILITY VEHICLES
   2 FAMILY MEDIUM TACTICAL VEHICLE                           .......           18,547  .......           18,547  .......           18,547  .......  ...............  .......  ...............
   3 CAP VEHICLES                                             .......              932  .......              932  .......              932  .......  ...............  .......  ...............
   4 ITEMS LESS THAN $5M (CARGO)                              .......            1,699  .......            1,699  .......            1,699  .......  ...............  .......  ...............

     SPECIAL PURPOSE VEHICLES
   5 SECURITY AND TACTICAL VEHICLES                           .......           10,850  .......           10,850  .......           10,850  .......  ...............  .......  ...............
   6 ITEMS LESS THAN $5M (SPECIAL)                            .......            9,246  .......            9,246  .......            9,246  .......  ...............  .......  ...............

     FIRE FIGHTING EQUIPMENT
   7 FIRE FIGHTING/CRASH RESCUE VEHICLES                      .......           23,148  .......           23,148  .......           23,148  .......  ...............  .......  ...............

     MATERIALS HANDLING EQUIPMENT
   8 ITEMS LESS THAT $5,000,000                               .......           18,323  .......           18,323  .......           18,323  .......  ...............  .......  ...............

     BASE MAINTENANCE SUPPORT
   9 RUNWAY SNOW REMOVAL & CLEANING EQUIP                     .......            1,685  .......            1,685  .......            1,685  .......  ...............  .......  ...............
  10 ITEMS LESS THAN $5M                                      .......           17,014  .......           17,014  .......           17,014  .......  ...............  .......  ...............
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, VEHICULAR EQUIPMENT                         .......          103,349  .......          103,349  .......          103,349  .......  ...............  .......

     ELECTRONICS AND TELECOMMUNICATIONS EQUIP

     COMM SECURITY EQUIPMENT [COMSEC]
  12 COMSEC EQUIPMENT                                         .......          166,559  .......          128,259  .......          166,559  .......  ...............  .......         +$38,300
  13 MODIFICATIONS (COMSEC)                                   .......            1,133  .......            1,133  .......            1,133  .......  ...............  .......  ...............

     INTELLIGENCE PROGRAMS
  14 INTELLIGENCE TRAINING EQUIPMENT                          .......            2,749  .......            2,749  .......            2,749  .......  ...............  .......  ...............
  15 INTELLIGENCE COMM EQUIP                                  .......           32,876  .......           32,876  .......           32,876  .......  ...............  .......  ...............
  16 ADVANCE TECH SENSORS                                     .......              877  .......              877  .......              877  .......  ...............  .......  ...............
  17 MISSION PLANNING SYSTEMS                                 .......           15,295  .......           15,295  .......           15,295  .......  ...............  .......  ...............

     ELECTRONICS PROGRAMS
  18 TRAFFIC CONTROL/LANDING                                  .......           21,984  .......           21,984  .......           21,984  .......  ...............  .......  ...............
  19 NATIONAL AIRSPACE SYSTEM                                 .......           30,698  .......           30,698  .......           30,698  .......  ...............  .......  ...............
  20 BATTLE CONTROL SYSTEM--FIXED                             .......           17,368  .......           17,368  .......           17,368  .......  ...............  .......  ...............
  21 THEATER AIR CONTROL SYS IMPRO                            .......           23,483  .......           23,483  .......           23,483  .......  ...............  .......  ...............
  22 WEATHER OBSERVATION FORECAST                             .......           17,864  .......           17,864  .......           17,864  .......  ...............  .......  ...............
  23 STRATEGIC COMMAND AND CONTROL                            .......           53,995  .......           28,995  .......           34,995  .......         -$19,000  .......           +6,000
  24 CHEYENNE MOUNTAIN COMPLEX                                .......           14,578  .......           14,578  .......           14,578  .......  ...............  .......  ...............
  25 TAC SIGNIT SPT                                           .......              208  .......              208  .......              208  .......  ...............  .......  ...............

     SPECIAL COMM--ELECTRONICS PROJECTS
  27 GENERAL INFORMATION TECHNOLOGY                           .......           69,743  .......           69,743  .......           69,743  .......  ...............  .......  ...............
  28 AF GLOBAL COMMAND & CONTROL SYSTEM                       .......           15,829  .......           15,829  .......           15,829  .......  ...............  .......  ...............
  29 MOBILITY COMMAND AND CONTROL                             .......           11,023  .......           11,023  .......           11,023  .......  ...............  .......  ...............
  30 AIR FORCE PHYSICAL SECURITY SYSTEM                       .......           64,521  .......           64,521  .......           64,521  .......  ...............  .......  ...............
  31 COMBAT TRAINING RANGES                                   .......           18,217  .......           18,217  .......           33,217  .......          +15,000  .......          +15,000
  32 C3 COUNTERMEASURES                                       .......           11,899  .......           11,899  .......           11,899  .......  ...............  .......  ...............
  33 GCSS-AF FOS                                              .......           13,920  .......           13,920  .......           13,920  .......  ...............  .......  ...............
  34 THEATER BATTLE MGT C2 SYS                                .......            9,365  .......            9,365  .......            9,365  .......  ...............  .......  ...............
  35 AIR OPERATIONS CENTER [AOC]                              .......           33,907  .......           33,907  .......           33,907  .......  ...............  .......  ...............

     AIR FORCE COMMUNICATIONS
  36 INFORMATION TRANSPORT SYSTEMS                            .......           52,464  .......           52,464  .......           52,464  .......  ...............  .......  ...............
  38 AFNET                                                    .......          125,788  .......          125,788  .......          125,788  .......  ...............  .......  ...............
  39 VOICE SYSTEMS                                            .......           16,811  .......           16,811  .......           16,811  .......  ...............  .......  ...............
  40 USCENTCOM                                                .......           32,138  .......           32,138  .......           32,138  .......  ...............  .......  ...............

     DISA PROGRAMS
  41 SPACE BASED IR SENSOR PROG SPACE                         .......           47,135  .......           47,135  .......           47,135  .......  ...............  .......  ...............
  42 NAVSTAR GPS SPACE                                        .......            2,031  .......            2,031  .......            2,031  .......  ...............  .......  ...............
  43 NUDET DETECTION SYS [NDS] SPACE                          .......            5,564  .......            5,564  .......            5,564  .......  ...............  .......  ...............
  44 AF SATELLITE CONTROL NETWORK SPACE                       .......           44,219  .......           44,219  .......           44,219  .......  ...............  .......  ...............
  45 SPACELIFT RANGE SYSTEM SPACE                             .......          109,545  .......          109,545  .......          109,545  .......  ...............  .......  ...............
  46 MILSATCOM SPACE                                          .......           47,592  .......           47,592  .......           47,592  .......  ...............  .......  ...............
  47 SPACE MODS SPACE                                         .......           47,121  .......           47,121  .......           47,121  .......  ...............  .......  ...............
  48 COUNTERSPACE SYSTEM                                      .......           20,961  .......           20,961  .......           20,961  .......  ...............  .......  ...............

     ORGANIZATION AND BASE
  49 TACTICAL C-E EQUIPMENT                                   .......          126,131  .......          126,131  .......          126,131  .......  ...............  .......  ...............
  50 COMBAT SURVIVOR EVADER LOCATER                           .......           23,707  .......           23,707  .......           23,707  .......  ...............  .......  ...............
  51 RADIO EQUIPMENT                                          .......           12,757  .......           12,757  .......           12,757  .......  ...............  .......  ...............
  52 CCTV/AUDIOVISUAL EQUIPMENT                               .......           10,716  .......           10,716  .......           10,716  .......  ...............  .......  ...............
  53 BASE COMM INFRASTRUCTURE                                 .......           74,528  .......           74,528  .......           74,528  .......  ...............  .......  ...............

     MODIFICATIONS
  54 COMM ELECT MODS                                          .......           43,507  .......           43,507  .......           43,507  .......  ...............  .......  ...............
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, ELECTRONICS AND TELECOMMUNICATIONS EQUIP    .......        1,490,806  .......        1,427,506  .......        1,486,806  .......           -4,000  .......          +59,300

     OTHER BASE MAINTENANCE AND SUPPORT EQUIP

     PERSONAL SAFETY AND RESCUE EQUIP
  55 NIGHT VISION GOGGLES                                     .......           22,693  .......           22,693  .......           22,693  .......  ...............  .......  ...............
  56 ITEMS LESS THAN $5,000,000 (SAFETY)                      .......           30,887  .......           30,887  .......           30,887  .......  ...............  .......  ...............

     DEPOT PLANT + MATERIALS HANDLING EQ
  57 MECHANIZED MATERIAL HANDLING                             .......            2,850  .......            2,850  .......            2,850  .......  ...............  .......  ...............

     BASE SUPPORT EQUIPMENT
  58 BASE PROCURED EQUIPMENT                                  .......            8,387  .......            8,387  .......            8,387  .......  ...............  .......  ...............
  59 CONTINGENCY OPERATIONS                                   .......           10,358  .......           10,358  .......           10,358  .......  ...............  .......  ...............
  60 PRODUCTIVITY CAPITAL INVESTMENT                          .......            3,473  .......            3,473  .......            3,473  .......  ...............  .......  ...............
  62 MOBILITY EQUIPMENT                                       .......           14,471  .......           14,471  .......           14,471  .......  ...............  .......  ...............
  63 ITEMS LESS THAN $5M (BASE SUPPORT)                       .......            1,894  .......            1,894  .......            1,894  .......  ...............  .......  ...............

     SPECIAL SUPPORT PROJECTS
  65 DARP RC135                                               .......           24,176  .......           24,176  .......           24,176  .......  ...............  .......  ...............
  66 DISTRIBUTED GROUND SYSTEMS                               .......          142,928  .......          142,928  .......          142,928  .......  ...............  .......  ...............
  68 SPECIAL UPDATE PROGRAM                                   .......          479,446  .......          479,446  .......          479,446  .......  ...............  .......  ...............
  69 DEFENSE SPACE RECONNAISSANCE PROGRAM                     .......           39,155  .......           39,155  .......           39,155  .......  ...............  .......  ...............
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, OTHER BASE MAINTENANCE AND SUPPORT EQUIP    .......          780,718  .......          780,718  .......          780,718  .......  ...............  .......

     SPARE AND REPAIR PARTS
  71 SPARES AND REPAIR PARTS                                  .......           14,663  .......           14,663  .......           14,663  .......  ...............  .......  ...............
     CLASSIFIED PROGRAMS                                      .......       14,331,312  .......       14,306,339  .......       14,622,812  .......         +291,500  .......         +316,473
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, OTHER PROCUREMENT, AIR FORCE                .......       16,720,848  .......       16,632,575  .......       17,008,348  .......         +287,500  .......         +375,773
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                 2013 budget       Committee       Change from
 Line                           Item                               estimate      recommendation  budget estimate
----------------------------------------------------------------------------------------------------------------
   23 Strategic Command And Control                                   53,995           34,995          -19,000
          Early to need                                      ...............  ...............          -19,000
   31 Combat Training Ranges                                          18,217           33,217          +15,000
          Test and Training Range Upgrades                   ...............  ...............          +15,000
      Classified Programs                                         14,331,312       14,622,812         +291,500
          Classified adjustment                              ...............  ...............         +291,500
----------------------------------------------------------------------------------------------------------------

                       Procurement, Defense-Wide

Appropriations, 2012....................................  $4,893,428,000
Budget estimate, 2013...................................   4,187,935,000
House allowance.........................................   4,429,335,000
Committee recommendation................................   4,692,685,000

    The Committee recommends an appropriation of 
$4,692,685,000. This is $504,750,000 above the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                                     [Dollars in thousands]
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                                     Change from               Change from
Line                            Item                              Qty.     2013 budget      Qty.   House allowance    Qty.      Committee    ---------------------------------------------------
                                                                             estimate                                         recommendation    Qty.   Budget estimate    Qty.   House allowance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                    PROCUREMENT, DEFENSE-WIDE

     MAJOR EQUIPMENT

     MAJOR EQUIPMENT, DCAA
   2 MAJOR EQUIPMENT

     ITEMS LESS THAN $5M                                      .......           $1,486  .......           $1,486  .......           $1,486  .......  ...............  .......  ...............

     MAJOR EQUIPMENT, DCMA
   3 MAJOR EQUIPMENT                                          .......            2,129  .......            2,129  .......            2,129  .......  ...............  .......  ...............

     MAJOR EQUIPMENT, DHRA
   5 PERSONNEL ADMINISTRATION                                 .......            6,147  .......            6,147  .......            6,147  .......  ...............  .......  ...............

     MAJOR EQUIPMENT, DISA
  12 INFORMATION SYSTEMS SECURITY                             .......           12,708  .......           12,708  .......           12,708  .......  ...............  .......  ...............
  14 GLOBAL COMBAT SUPPORT SYSTEM                             .......            3,002  .......            3,002  .......            3,002  .......  ...............  .......  ...............
  15 TELEPORT PROGRAM                                         .......           46,992  .......           46,992  .......           46,992  .......  ...............  .......  ...............
  16 ITEMS LESS THAN $5M                                      .......          108,462  .......          108,462  .......          108,462  .......  ...............  .......  ...............
  17 NET CENTRIC ENTERPRISE SERVICES [NCES]                   .......            2,865  .......            2,865  .......            2,865  .......  ...............  .......  ...............
  18 DEFENSE INFORMATION SYSTEMS NETWORK                      .......          116,906  .......          116,906  .......          116,906  .......  ...............  .......  ...............
  19 PUBLIC KEY INFRASTRUCTURE                                .......            1,827  .......            1,827  .......            1,827  .......  ...............  .......  ...............
  21 CYBER SECURITY INITIATIVE                                .......           10,319  .......           10,319  .......           10,319  .......  ...............  .......  ...............

     MAJOR EQUIPMENT, DLA
  22 MAJOR EQUIPMENT                                          .......            9,575  .......            9,575  .......            6,775  .......          -$2,800  .......          -$2,800

     MAJOR EQUIPMENT, DMACT
  23 A-WEAPON SYSTEM COST                                           6           15,179        6           15,179        6           15,179  .......  ...............  .......  ...............

     MAJOR EQUIPMENT, DODEA
  24 AUTOMATION/EDUCATIONAL SUPPORT & LOGISTICS               .......            1,458  .......            1,458  .......            1,458  .......  ...............  .......  ...............
  26 EQUIPMENT                                                .......            2,522  .......            2,522  .......            2,522  .......  ...............  .......  ...............

     MAJOR EQUIPMENT, DEFENSE THREAT REDUCTION AGENCY
  27 VEHICLES                                                       1               50        1               50        1               50  .......  ...............  .......  ...............
  28 OTHER MAJOR EQUIPMENT                                          3           13,096        3           13,096        3           12,433  .......             -663  .......             -663

     MAJOR EQUIPMENT, MDA
  30 THAAD SYSTEM                                                  36          460,728       36          460,728       36          460,728  .......  ...............  .......  ...............
  31 AEGIS BMD                                                     29          389,626       29          389,626       46          578,626      +17         +189,000      +17         +189,000
  32 BMDS AN/TPY-2 RADARS                                           1          217,244        1          217,244        2          380,244       +1         +163,000       +1         +163,000
  33 RADAR SYSTEMS                                            .......           10,177  .......           10,177  .......           10,177  .......  ...............  .......  ...............
  33 IRON DOME SYSTEM                                         .......  ...............  .......  ...............  .......          211,000  .......         +211,000  .......         +211,000

     MAJOR EQUIPMENT, NSA
  41 INFORMATION SYSTEMS SECURITY PROGRAM [ISSP]              .......            6,770  .......            6,770  .......            6,770  .......  ...............  .......  ...............

     MAJOR EQUIPMENT, OSD
  42 MAJOR EQUIPMENT, OSD                                     .......           45,938  .......           45,938  .......           45,938  .......  ...............  .......  ...............
  43 MAJOR EQUIPMENT, INTELLIGENCE                            .......           17,582  .......           17,582  .......           17,582  .......  ...............  .......  ...............

     MAJOR EQUIPMENT, TJS
  44 MAJOR EQUIPMENT, TJS                                     .......           21,878  .......           21,878  .......           21,878  .......  ...............  .......  ...............

     MAJOR EQUIPMENT, WHS
  45 MAJOR EQUIPMENT, WHS                                     .......           26,550  .......           26,550  .......           26,550  .......  ...............  .......  ...............
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, MAJOR EQUIPMENT                             .......        1,551,216  .......        1,551,216  .......        2,110,753  .......         +559,537  .......         +559,537

     SPECIAL OPERATIONS COMMAND

     AVIATION PROGRAMS
  46 SOF ROTARY WING UPGRADES AND SUSTAINMENT                 .......           74,832  .......           74,832  .......           74,832  .......  ...............  .......  ...............
  48 MH-60 SOF MODERNIZATION PROGRAM                          .......          126,780  .......          126,780  .......          126,780  .......  ...............  .......  ...............
  49 NON-STANDARD AVIATION                                          7           99,776        7           37,000        7           37,000  .......          -62,776  .......  ...............
  51 SOF U-28                                                 .......            7,530  .......          167,906  .......           70,306  .......          +62,776  .......          -97,600
  52 MH-47 CHINOOK                                                  7          134,785        7          134,785        7          134,785  .......  ...............  .......  ...............
  53 RQ-11 UNMANNED AERIAL VEHICLE                            .......            2,062  .......            2,062  .......            2,062  .......  ...............  .......  ...............
  54 CV-22 SOF MODIFICATION                                         4          139,147        4          139,147        4          139,147  .......  ...............  .......  ...............
  55 MQ-1 UNMANNED AERIAL VEHICLE                             .......            3,963  .......           26,963  .......            3,963  .......  ...............  .......          -23,000
  56 MQ-9 UNMANNED AERIAL VEHICLE                             .......            3,952  .......           39,352  .......            3,952  .......  ...............  .......          -35,400
  58 STUASL0                                                  .......           12,945  .......           12,945  .......  ...............  .......          -12,945  .......          -12,945
  59 PRECISION STRIKE PACKAGE                                 .......           73,013  .......           73,013  .......           73,013  .......  ...............  .......  ...............
  60 AC-130J                                                  .......           51,484  .......           51,484  .......           32,806  .......          -18,678  .......          -18,678
  62 C-130 MODIFICATIONS                                      .......           25,248  .......           25,248  .......           25,248  .......  ...............  .......  ...............
  64 AIRCRAFT SUPPORT                                         .......            5,314  .......            5,314  .......            5,314  .......  ...............  .......  ...............

     SHIPBUILDING
  64 UNDERWATER SYSTEMS                                       .......           23,037  .......           23,037  .......            6,449  .......          -16,588  .......          -16,588

     AMMUNITION PROGRAMS
  66 SOF ORDNANCE REPLENISHMENT                               .......          113,183  .......          113,183  .......          113,183  .......  ...............  .......  ...............
  67 SOF ORDNANCE ACQUISITION                                 .......           36,981  .......           36,981  .......           36,981  .......  ...............  .......  ...............

     OTHER PROCUREMENT PROGRAMS
  68 COMM EQUIPMENT & ELECTRONICS                             .......           99,838  .......          145,738  .......           99,838  .......  ...............  .......          -45,900
  69 SOF INTELLIGENCE SYSTEMS                                 .......           71,428  .......           71,428  .......           71,428  .......  ...............  .......  ...............
  70 SMALL ARMS & WEAPONS                                     .......           27,108  .......           27,108  .......           27,108  .......  ...............  .......  ...............
  71 DCGS-SOF                                                 .......           12,767  .......           15,967  .......           12,767  .......  ...............  .......           -3,200
  74 SOF COMBATANT CRAFT SYSTEMS                              .......           42,348  .......           42,348  .......           42,348  .......  ...............  .......  ...............
  75 SPARES AND REPAIR PARTS                                  .......              600  .......              600  .......              600  .......  ...............  .......  ...............
  77 TACTICAL VEHICLES                                        .......           37,421  .......           37,421  .......           37,421  .......  ...............  .......  ...............
  78 MISSION TRAINING AND PREPARATIONS SYSTEMS                .......           36,949  .......           41,949  .......           38,273  .......           +1,324  .......           -3,676
  79 COMBAT MISSION REQUIREMENTS                              .......           20,255  .......           20,255  .......           20,255  .......  ...............  .......  ...............
  80 MILCON COLLATERAL EQUIPMENT                              .......           17,590  .......           17,590  .......           17,590  .......  ...............  .......  ...............
  82 SOF AUTOMATION SYSTEMS                                   .......           66,573  .......           66,573  .......           66,573  .......  ...............  .......  ...............
  83 SOF GLOBAL VIDEO SURVEILLANCE ACTIVITIES                 .......            6,549  .......            6,549  .......            6,549  .......  ...............  .......  ...............
  84 SOF OPERATIONAL ENHANCEMENTS INTELLIGENCE                .......           32,335  .......           32,335  .......           32,335  .......  ...............  .......  ...............
  85 SOF SOLDIER PROTECTION AND SURVIVAL SYSTEMS              .......           15,153  .......           15,153  .......           15,153  .......  ...............  .......  ...............
  86 SOF VISUAL AUGMENTATION, LASERS AND SENSOR SY            .......           33,920  .......           33,920  .......           33,920  .......  ...............  .......  ...............
  87 SOF TACTICAL RADIO SYSTEMS                               .......           75,132  .......           75,132  .......           75,132  .......  ...............  .......  ...............
  90 MISCELLANEOUS EQUIPMENT                                  .......            6,667  .......            6,667  .......            6,667  .......  ...............  .......  ...............
  91 SOF OPERATIONAL ENHANCEMENTS                             .......          217,972  .......          243,272  .......          217,972  .......  ...............  .......          -25,300
  92 MILITARY INFORMATION SUPPORT OPERATIONS                  .......           27,417  .......           27,417  .......           27,417  .......  ...............  .......  ...............
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, SPECIAL OPERATIONS COMMAND                  .......        1,782,054  .......        2,017,454  .......        1,735,167  .......          -46,887  .......         -282,287

     CHEMICAL/BIOLOGICAL DEFENSE
  93 INSTALLATION FORCE PROTECTION                            .......           24,025  .......           24,025  .......           24,025  .......  ...............  .......  ...............
  94 INDIVIDUAL PROTECTION                                    .......           73,720  .......           73,720  .......           73,720  .......  ...............  .......  ...............
  95 DECONTAMINATION                                          .......              506  .......              506  .......              506  .......  ...............  .......  ...............
  96 JOINT BIOLOGICAL DEFENSE PROGRAM                         .......           32,597  .......           32,597  .......           32,597  .......  ...............  .......  ...............
  97 COLLECTIVE PROTECTION                                    .......            3,144  .......            3,144  .......            3,144  .......  ...............  .......  ...............
  98 CONTAMINATION AVOIDANCE                                  .......          164,886  .......          164,886  .......          164,886  .......  ...............  .......  ...............
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, CHEMICAL/BIOLOGICAL DEFENSE                 .......          298,878  .......          298,878  .......          298,878  .......  ...............  .......

     CLASSIFIED PROGRAMS                                      .......          555,787  .......          561,787  .......          547,887  .......           -7,900  .......          -13,900
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, PROCUREMENT, DEFENSE-WIDE                   .......        4,187,935  .......        4,429,335  .......        4,692,685  .......         +504,750  .......         +263,350
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                 2013 budget       Committee       Change from
Line                            Item                               estimate      recommendation  budget estimate
----------------------------------------------------------------------------------------------------------------
  22 Major Equipment                                                   9,575            6,775           -2,800
         Virtual Interactive Processing System--change in    ...............  ...............           -2,800
          acquisition strategy
  28 Other Major Equipment                                            13,096           12,433             -663
         Early to need emergent technologies line            ...............  ...............             -663
  31 Aegis BMD                                                       389,626          578,626         +189,000
         17 additional SM-3 IB interceptors                  ...............  ...............         +189,000
  32 BMDS AN/TPY-2 Radars                                            217,244          380,244         +163,000
         Additional AN/TPY-2 radar                           ...............  ...............         +163,000
  34 Iron Dome                                               ...............          211,000         +211,000
         Program increase--authorization adjustment          ...............  ...............         +211,000
  49 Non-Standard Aviation                                            99,776           37,000          -62,776
         SOCOM requested transfer to Procurement Defense-    ...............  ...............          -62,776
          Wide Line 51
  51 U-28                                                              7,530           70,306          +62,776
         SOCOM requested transfer from Procurement Defense-  ...............  ...............          +62,776
          Wide Line 49
  58 STUASL0                                                          12,945  ...............          -12,945
         Early to need--production delay                     ...............  ...............          -12,945
  60 AC/MC-130J                                                       51,484           32,806          -18,678
         Excess to need due to testing schedule delays       ...............  ...............          -18,678
  64 Underwater Systems                                               23,037            6,449          -16,588
         Excess to need due to reviews slipping and program  ...............  ...............           -8,588
          rebaselining in development
         SOCOM requested transfer to RDT&E Defense-Wide      ...............  ...............           -8,000
          Line 272
  78 Mission Training and Preparation Systems                         36,949           38,273           +1,324
         SOCOM requested transfer from RDT&E Defense-Wide    ...............  ...............           +1,324
          Line 262
     Classified Programs                                             555,787          547,887           -7,900
         Classified adjustment                               ...............  ...............           -7,900
----------------------------------------------------------------------------------------------------------------

    Special Operations Command [SOCOM].--The fiscal year 2013 
request includes $99,776,000 for nonstandard aviation aircraft 
and $7,530,000 for U-28 aircraft. SOCOM is consolidating and 
combining these efforts and in doing so requested to transfer 
$62,776,000 from nonstandard aviation to U-28 aircraft. This 
consolidation is necessary to meet current and future SOCOM 
demands and maximize combat capability. In order to execute 
this efficiency, the Committee also recommends using 
appropriated funds to complete the modifications necessary to 
convert four nonstandard aircraft into U-28 aircraft 
configuration.
    Special Operations Command [SOCOM].--Following the 
submission of the fiscal year 2013 budget request, SOCOM 
submitted an urgent request for a high definition full motion 
video payload for existing weapons systems. To support this 
important initiative, the Committee recommends a $142,400,000 
increase over the budget request. To ensure SOCOM has the 
capacity to properly receive and analyze the data, within 120 
days after enactment, the Committee directs the Commander of 
U.S. Special Operations Command to submit a report outlining 
SOCOM's plan to support the bandwidth demands and manpower 
necessary.

                         MISSILE DEFENSE AGENCY

    Standard Missile-3 Block IB [SM-3 IB].--The fiscal year 
2013 budget request includes $389,626,000 for the procurement 
of 29 SM-3 IB interceptors, a reduction of 33 interceptors from 
previous plans. The Committee is aware of this program's past 
developmental challenges which warranted a slow-down of the 
production ramp. However, the Committee is further aware that 
the SM-3 IB recently concluded two successful intercept tests 
and appears headed toward a production decision pending success 
of the next flight intercept planned for the first quarter of 
fiscal year 2013. The Committee is further aware of Combatant 
Commanders' continued high demand for the SM-3 interceptor and 
therefore recommends an increase of $189,000,000 for 17 
additional Block 1B interceptors.
    AN/TPY-2 Radar.--The fiscal year 2013 budget request 
includes $217,244,000 for the procurement of one AN/TPY-2 
radar, a reduction of one radar from the prior year. The 
Committee notes the high operational demands for the AN/TPY-2 
radar, to include a recent deployment directed by the Chairman 
of the Joint Chiefs of Staff. The Committee is aware of 
potential emerging requirements for this radar and recommends 
an additional $163,000,000 only for the procurement of a second 
AN/TPY-2 radar in fiscal year 2013. The Committee notes that 
the total fiscal year 2013 recommendation of $380,244,000 is 
equal to amounts appropriated in fiscal year 2012 allowing for 
the purchase of two radars.

                    Defense Production Act Purchases

Appropriations, 2012....................................    $169,964,000
Budget estimate, 2013...................................      89,189,000
House allowance.........................................      63,531,000
Committee recommendation................................     189,189,000

    The Committee recommends an appropriation of $189,189,000. 
This is $100,000,000 above the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                                     [Dollars in thousands]
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                                     Change from               Change from
Line                            Item                              Qty.     2013 budget      Qty.   House allowance    Qty.      Committee    ---------------------------------------------------
                                                                             estimate                                         recommendation    Qty.   Budget estimate    Qty.   House allowance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                 DEFENSE PRODUCTION ACT PURCHASES

   1 DEFENSE PRODUCTION ACT PURCHASES                         .......          $89,189  .......          $63,531  .......         $189,189  .......        +$100,000  .......        +$125,658
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

    Additional Funding.--The Committee recognizes the critical 
role that the DPA title III program serves in strengthening the 
U.S. defense industrial base and believes that this work is in 
the national interest. Therefore, the Committee increases 
funding for DPA by $100,000,000 over the budget request. The 
Committee directs that the additional funding be competitively 
awarded to new initiatives and priority consideration should be 
given to completion of DPA projects initiated in prior years. 
Furthermore, the Committee directs the Under Secretary of 
Defense for Acquisition, Technology, and Logistics to inform 
the congressional defense committees 30 days prior to any 
obligation or expenditure of these funds.

                                TITLE IV

               RESEARCH, DEVELOPMENT, TEST AND EVALUATION

    Funds appropriated under this title provide the resources 
required to conduct a program of research, development, test 
and evaluation, including research in basic science, applied 
research, advanced technology development, demonstration and 
validation, engineering and manufacturing development, and 
operational systems development.
    The President's fiscal year 2013 budget requests a total of 
$69,407,767,000 for research, development, test and evaluation 
appropriations.

                      SUMMARY OF COMMITTEE ACTION

    The Committee recommends research, development, test and 
evaluation appropriations totaling $69,091,078,000 for fiscal 
year 2013. This is $316,689,000 below the budget estimate.
    Committee recommended research, development, test and 
evaluation appropriations for fiscal year 2013 are summarized 
below:

                      SUMMARY OF RESEARCH, DEVELOPMENT, TEST AND EVALUATION APPROPRIATIONS
                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                                                    Change from
                             Account                                2013 budget      Committee        budget
                                                                     estimate     recommendation     estimate
----------------------------------------------------------------------------------------------------------------
Research, Development, Test and Evaluation:.....................
    Research, Development, Test and Evaluation, Army............       8,929,415       8,427,588        -501,827
    Research, Development, Test and Evaluation, Navy............      16,882,877      16,646,307        -236,570
    Research, Development, Test and Evaluation, Air Force.......      25,428,046      25,374,286         -53,760
    Research, Development, Test and Evaluation, Defense-Wide....      17,982,161      18,419,129        +436,968
    Operational Test and Evaluation, Defense....................         185,268         223,768         +38,500
                                                                 -----------------------------------------------
      Total.....................................................      69,407,767      69,091,078        -316,689
----------------------------------------------------------------------------------------------------------------

                       COMMITTEE RECOMMENDATIONS

    The Committee has displayed recommended adjustments in 
tables presented under each appropriation account.
    These adjustments reflect the following Committee actions: 
elimination of funds requested for programs which are lower 
priority, duplicative, or not supported by firm requirements in 
out-year development or procurement appropriations; deletion of 
excess funds based on program delays or slow execution; 
addition of funds to reflect congressional priorities and to 
rectify shortfalls in the budget estimate; and implementation 
of recommendations in S. 3254, the National Defense 
Authorization Act for Fiscal Year 2013, as reported.
    The Committee directs that the funding increases outlined 
in these tables shall be provided only for the specific 
purposes indicated in the table.

          RESEARCH, DEVELOPMENT, TEST AND EVALUATION OVERVIEW

    Research, Development, Test and Evaluation [RDT&E] Budget 
Exhibits.--The Committee appreciates the efforts of the Under 
Secretary of Defense, Comptroller, to standardize the RDT&E 
budget exhibits. However, the Committee notes the absence of R-
3 exhibits for many programs resulting from the Financial 
Management Regulation change that now only requires R-3 
exhibits for acquisition category 1D programs. The 
congressional defense committees rely on these justification 
exhibits regardless of acquisition category level. Therefore, 
for the fiscal year 2014 budget submission, the Under Secretary 
of Defense, Comptroller is directed to provide R-3 exhibits for 
all programs funded in Budget Activities 4, 5, and 7 regardless 
of acquisition category or funding amount.
    Joint Strike Fighter [JSF] Modernization.--The fiscal year 
2013 Navy and Marine Corps' budget request includes $16,834,000 
for modernization, an increase of over $7,000,000 above the 
fiscal year 2012 enacted amount. The Committee is concerned 
that the Department plans to begin modernization when the 
baseline development program is not scheduled to complete until 
fiscal year 2018. Beginning modernization in fiscal year 2013 
creates a 6-year overlap of baseline development and 
modernization, adding to existing concurrency risk in the 
program. Prior to beginning the modernization effort, the 
Committee directs the Secretary of Defense to create a Joint 
Requirement Oversight Council and warfighter validated joint 
modernization roadmap, spanning the unclassified and classified 
programs, that prioritizes the future capability improvements 
for each aircraft variant. The Committee denies the fiscal year 
2013 request of $16,834,000 and expects the program office to 
utilize fiscal year 2012 funding to create this modernization 
roadmap. In addition, the Committee recommends the program 
office budget for modernization efforts in a separate program 
element in future budget submissions.
    Joint Strike Fighter [JSF] Configuration Management.--The 
Committee notes that during the low rate initial production 
aircraft lots one through five, there is one hardware 
configuration and five software configurations. Beginning in 
low rate initial production lot six, the hardware and software 
configuration differ when compared to earlier lots of aircraft. 
The Committee is concerned with establishing multiple hardware 
and software configurations across the fleet, especially 
because these aircraft deliver to multiple locations worldwide. 
The Committee recommends the program office establish a 
hardware and software management strategy to maximize 
technology insertion without hampering affordability.
    Army Missile Defense Programs.--The Committee understands 
that the Army has initiated a business case analysis [BCA] to 
determine the costs, benefits and risks associated with a 
potential transfer of certain missile defense activities and 
elements from the Army to the Missile Defense Agency [MDA]. The 
Committee understands that the BCA is still in progress and 
will review it following its submission to the congressional 
defense committees. The Committee further understands that no 
assets or activities will be transferred during fiscal years 
2012 or 2013, consistent with the fact that no funds have been 
appropriated in this or prior Department of Defense 
Appropriations Acts to fund a transfer of Army missile defense 
program responsibilities to MDA, or to fund the implementation 
of the Army's Program Executive Officer [PEO] for Missiles and 
Space serving as the Program Executive for Army missile defense 
systems within MDA.
    Foreign Object Debris Detection Systems.--The Committee is 
concerned that the Department of Defense is not adequately 
taking advantage of technologies that would reduce foreign 
object debris-related aircraft engine replacement or repair 
costs across the services. Accordingly, the Committee 
encourages the Secretary of Defense to develop a plan to begin 
the use of high technology debris detection systems to reduce 
both the hazards and maintenance costs associated with foreign 
object debris, while improving aviation safety in both ground 
and air operations.
    Technology Transfer.--The Committee recognizes the 
importance of transitioning technology between the Federal 
Government and non-Federal organizations, academia, the 
nonprofit sector, and state and local governments. Technology 
transfer ensures that taxpayer investments in research and 
development are used to significantly benefit the economy and 
the general public, along with promoting commercialization for 
small businesses. Further, in fulfilling its responsibility to 
ensure the full use of the results of the Nation's Federal 
investment in research and development, the Committee 
encourages the Department of Defense to place an increased 
focus on transferring technologies to these entities.

            Research, Development, Test and Evaluation, Army

Appropriations, 2012....................................  $8,745,492,000
Budget estimate, 2013...................................   8,929,415,000
House allowance.........................................   8,593,055,000
Committee recommendation................................   8,427,588,000

    The Committee recommends an appropriation of 
$8,427,588,000. This is $501,827,000 below the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                [In thousands of dollars]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2013 budget        House         Committee   -------------------------------
                                         Item                                estimate        allowance    recommendation      Budget           House
                                                                                                                             estimate        allowance
--------------------------------------------------------------------------------------------------------------------------------------------------------
                  RESEARCH, DEVELOPMENT, TEST & EVAL, ARMY

     BASIC RESEARCH
     IN-HOUSE LABORATORY INDEPENDENT RESEARCH                                   20,860          20,860          20,860  ..............  ..............
     DEFENSE RESEARCH SCIENCES                                                 219,180         219,180         219,180  ..............  ..............
     UNIVERSITY RESEARCH INITIATIVES                                            80,986          80,986          80,986  ..............  ..............
     UNIVERSITY AND INDUSTRY RESEARCH CENTERS                                  123,045         107,446         123,045  ..............         +15,599
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BASIC RESEARCH                                               444,071         428,472         444,071  ..............         +15,599

     APPLIED RESEARCH
     MATERIALS TECHNOLOGY                                                       29,041          39,041          69,041         +40,000         +30,000
     SENSORS AND ELECTRONIC SURVIVABILITY                                       45,260          45,260          45,260  ..............  ..............
     TRACTOR HIP                                                                22,439          22,439          22,439  ..............  ..............
     AVIATION TECHNOLOGY                                                        51,607          51,607          51,607  ..............  ..............
     ELECTRONIC WARFARE TECHNOLOGY                                              15,068          15,068          15,068  ..............  ..............
     MISSILE TECHNOLOGY                                                         49,383          49,383          49,383  ..............  ..............
     ADVANCED WEAPONS TECHNOLOGY                                                25,999          25,999          25,999  ..............  ..............
     ADVANCED CONCEPTS AND SIMULATION                                           23,507          23,507          23,507  ..............  ..............
     COMBAT VEHICLE AND AUTOMOTIVE TECHNOLOGY                                   69,062          69,062          69,062  ..............  ..............
     BALLISTICS TECHNOLOGY                                                      60,823          60,823          60,823  ..............  ..............
     CHEMICAL, SMOKE AND EQUIPMENT DEFEATING TECHNOLOGY                          4,465           4,465           4,465  ..............  ..............
     JOINT SERVICE SMALL ARMS PROGRAM                                            7,169           7,169           7,169  ..............  ..............
     WEAPONS AND MUNITIONS TECHNOLOGY                                           35,218          50,218          35,218  ..............         -15,000
     ELECTRONICS AND ELECTRONIC DEVICES                                         60,300          80,300          60,300  ..............         -20,000
     NIGHT VISION TECHNOLOGY                                                    53,244          53,244          53,244  ..............  ..............
     COUNTERMINE SYSTEMS                                                        18,850          18,850          33,850         +15,000         +15,000
     HUMAN FACTORS ENGINEERING TECHNOLOGY                                       19,872          19,872          19,872  ..............  ..............
     ENVIRONMENTAL QUALITY TECHNOLOGY                                           20,095          20,095          20,095  ..............  ..............
     COMMAND, CONTROL, COMMUNICATIONS TECHNOLOGY                                28,852          28,852          28,852  ..............  ..............
     COMPUTER AND SOFTWARE TECHNOLOGY                                            9,830           9,830           9,830  ..............  ..............
     MILITARY ENGINEERING TECHNOLOGY                                            70,693          70,693          77,693          +7,000          +7,000
     MANPOWER/PERSONNEL/TRAINING TECHNOLOGY                                     17,781          17,781          17,781  ..............  ..............
     WARFIGHTER TECHNOLOGY                                                      28,281          28,281          58,281         +30,000         +30,000
     MEDICAL TECHNOLOGY                                                        107,891         107,891         107,891  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, APPLIED RESEARCH                                             874,730         919,730         966,730         +92,000         +47,000

     ADVANCED TECHNOLOGY DEVELOPMENT
     WARFIGHTER ADVANCED TECHNOLOGY                                             39,359          39,359          39,359  ..............  ..............
     MEDICAL ADVANCED TECHNOLOGY                                                69,580         100,580          77,580          +8,000         -23,000
     AVIATION ADVANCED TECHNOLOGY                                               64,215          64,215          76,015         +11,800         +11,800
     WEAPONS AND MUNITIONS ADVANCED TECHNOLOGY                                  67,613          77,613          67,613  ..............         -10,000
     COMBAT VEHICLE AND AUTOMOTIVE ADVANCED TECHNOLOGY                         104,359         104,359         144,359         +40,000         +40,000
     COMMAND, CONTROL, COMMUNICATIONS ADVANCED TECHNOLOGY                        4,157           4,157           4,157  ..............  ..............
     MANPOWER, PERSONNEL AND TRAINING ADVANCED TECHNOLOGY                        9,856           9,856           9,856  ..............  ..............
     ELECTRONIC WARFARE ADVANCED TECHNOLOGY                                     50,661          50,661          50,661  ..............  ..............
     TRACTOR HIKE                                                                9,126           9,126           9,126  ..............  ..............
     NEXT GENERATION TRAINING & SIMULATION SYSTEMS                              17,257          17,257          17,257  ..............  ..............
     TRACTOR ROSE                                                                9,925           9,925           9,925  ..............  ..............
     MILITARY HIV RESEARCH                                                       6,984          22,984           6,984  ..............         -16,000
     COMBATING TERRORISM, TECHNOLOGY DEVELOPMENT                                 9,716           9,716           9,716  ..............  ..............
     TRACTOR NAIL                                                                3,487           3,487           3,487  ..............  ..............
     TRACTOR EGGS                                                                2,323           2,323           2,323  ..............  ..............
     ELECTRONIC WARFARE TECHNOLOGY                                              21,683          21,683          21,683  ..............  ..............
     MISSILE AND ROCKET ADVANCED TECHNOLOGY                                     71,111          71,111          90,111         +19,000         +19,000
     TRACTOR CAGE                                                               10,902          10,902          10,902  ..............  ..............
     HIGH PERFORMANCE COMPUTING MODERNIZATION PROGRAM                          180,582         180,582         228,182         +47,600         +47,600
     LANDMINE WARFARE AND BARRIER ADVANCED TECHNOLOGY                           27,204          27,204          27,204  ..............  ..............
     JOINT SERVICE SMALL ARMS PROGRAM                                            6,095           6,095           6,095  ..............  ..............
     NIGHT VISION ADVANCED TECHNOLOGY                                           37,217          37,217          37,217  ..............  ..............
     ENVIRONMENTAL QUALITY TECHNOLOGY DEMONSTRATIONS                            13,626          13,626          13,626  ..............  ..............
     MILITARY ENGINEERING ADVANCED TECHNOLOGY                                   28,458          28,458          28,458  ..............  ..............
     ADVANCED TACTICAL COMPUTER SCIENCE & SENSOR TECHNOLOGY                     25,226          25,226          25,226  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, ADVANCED TECHNOLOGY DEVELOPMENT                              890,722         947,722       1,017,122        +126,400         +69,400

     DEMONSTRATION & VALIDATION
     ARMY MISSILE DEFENSE SYSTEMS INTEGRATION                                   14,505          24,505          14,505  ..............         -10,000
     ARMY MISSILE DEFENSE SYSTEMS INTEGRATION (SPACE)                            9,876           9,876           9,876  ..............  ..............
     LANDMINE WARFARE AND BARRIER--ADV DEV                                       5,054           5,054           5,054  ..............  ..............
     SMOKE, OBSCURANT AND TARGET DEFEATING SYS--ADV DEV                          2,725           2,725           2,725  ..............  ..............
     TANK AND MEDIUM CALIBER AMMUNITION                                         30,560          30,560          30,560  ..............  ..............
     ADVANCED TANK ARMAMENT SYSTEM [ATAS]                                       14,347          14,347          14,347  ..............  ..............
     SOLDIER SUPPORT AND SURVIVABILITY                                          10,073          10,073           4,014          -6,059          -6,059
     TACTICAL ELECTRONIC SURVEILLANCE SYSTEM--AD                                 8,660           8,660           8,660  ..............  ..............
     NIGHT VISION SYSTEMS ADVANCED DEVELOPMENT                                  10,715          10,715          10,715  ..............  ..............
     ENVIRONMENTAL QUALITY TECHNOLOGY                                            4,631           4,631           4,631  ..............  ..............
     WARFIGHTER INFORMATION NETWORK-TACTICAL                                   278,018         278,018         171,418        -106,600        -106,600
     NATO RESEARCH AND DEVELOPMENT                                               4,961           4,961           4,961  ..............  ..............
     AVIATION--ADV DEV                                                           8,602           8,602           8,602  ..............  ..............
     LOGISTICS AND ENGINEER EQUIPMENT--ADV DEV                                  14,605          14,605          14,605  ..............  ..............
     COMBAT SERVICE SUPPORT CONTROL SYSTEM EVALUATION                            5,054           5,054           5,054  ..............  ..............
     MEDICAL SYSTEMS--ADV DEV                                                   24,384          24,384          24,384  ..............  ..............
     SOLDIER SYSTEMS--ADVANCED DEVELOPMENT                                      32,050          32,050          32,050  ..............  ..............
     INTEGRATED BROADCAST SERVICE                                                   96              96              96  ..............  ..............
     TECHNOLOGY MATURATION INITIATIVES                                          24,868          24,868           2,197         -22,671         -22,671
     ANALYSIS OF ALTERNATIVES                                           ..............  ..............          10,871         +10,871         +10,871
     TRACTOR JUTE                                                                   59              59              59  ..............  ..............
     INDIRECT FIRE PROTECTION CAPABILITY INCREMENT 2-INTERC                     76,039          76,039          28,829         -47,210         -47,210
     INTEGRATED BASE DEFENSE                                                     4,043           4,043           4,043  ..............  ..............
     ENDURANCE UAVS                                                             26,196          26,196  ..............         -26,196         -26,196
                                                                       ---------------------------------------------------------------------------------
           TOTAL, DEMONSTRATION & VALIDATION                                   610,121         620,121         412,256        -197,865        -207,865

     ENGINEERING & MANUFACTURING DEVELOPMENT
     AIRCRAFT AVIONICS                                                          78,538          78,538          50,038         -28,500         -28,500
     ARMED, DEPLOYABLE OH-58D                                                   90,494          90,494          90,494  ..............  ..............
     ELECTRONIC WARFARE DEVELOPMENT                                            181,347         181,347         128,247         -53,100         -53,100
     MID-TIER NETWORKING VEHICULAR RADIO                                        12,636          12,636           2,636         -10,000         -10,000
     ALL SOURCE ANALYSIS SYSTEM                                                  5,694           5,694           5,694  ..............  ..............
     TRACTOR CAGE                                                               32,095          32,095           5,095         -27,000         -27,000
     INFANTRY SUPPORT WEAPONS                                                   96,478          91,478          89,678          -6,800          -1,800
     MEDIUM TACTICAL VEHICLES                                                    3,006           3,006           3,006  ..............  ..............
     JAVELIN                                                                     5,040           5,040           5,040  ..............  ..............
     FAMILY OF HEAVY TACTICAL VEHICLES                                           3,077           3,077           3,077  ..............  ..............
     AIR TRAFFIC CONTROL                                                         9,769           9,769           9,769  ..............  ..............
     TACTICAL UNMANNED GROUND VEHICLE                                           13,141          13,141  ..............         -13,141         -13,141
     NIGHT VISION SYSTEMS--SDD                                                  32,621          32,621          32,621  ..............  ..............
     COMBAT FEEDING, CLOTHING, AND EQUIPMENT                                     2,132           2,132           2,132  ..............  ..............
     NON-SYSTEM TRAINING DEVICES--SDD                                           44,787          44,787          44,787  ..............  ..............
     TERRAIN INFORMATION--SDD                                                    1,008           1,008           1,008  ..............  ..............
     AIR DEFENSE COMMAND, CONTROL AND INTELLIGENCE--SDD                         73,333          73,333          48,408         -24,925         -24,925
     CONSTRUCTIVE SIMULATION SYSTEMS DEVELOPMENT                                28,937          28,937          28,937  ..............  ..............
     AUTOMATIC TEST EQUIPMENT DEVELOPMENT                                       10,815          10,815          10,815  ..............  ..............
     DISTRIBUTIVE INTERACTIVE SIMULATIONS [DIS]--SDD                            13,926          13,926          13,926  ..............  ..............
     COMBINED ARMS TACTICAL TRAINER [CATT] CORE                                 17,797          17,797          17,797  ..............  ..............
     BRIGADE ANALYSIS, INTEGRATION AND EVALUATION                              214,270         214,270         214,270  ..............  ..............
     WEAPONS AND MUNITIONS--SDD                                                 14,581          14,581          14,581  ..............  ..............
     LOGISTICS AND ENGINEER EQUIPMENT--SDD                                      43,706          43,706          43,706  ..............  ..............
     COMMAND, CONTROL, COMMUNICATIONS SYSTEMS--SDD                              20,776          20,776          20,776  ..............  ..............
     MEDICAL MATERIEL/MEDICAL BIOLOGICAL DEFENSE EQUIPMENT                      43,395          43,395          43,395  ..............  ..............
     LANDMINE WARFARE/BARRIER--SDD                                             104,983         104,983          44,483         -60,500         -60,500
     ARTILLERY MUNITIONS                                                         4,346           4,346           4,346  ..............  ..............
     ARMY TACTICAL COMMAND & CONTROL HARDWARE & SOFTWARE                        77,223          77,223          49,023         -28,200         -28,200
     RADAR DEVELOPMENT                                                           3,486           3,486           3,486  ..............  ..............
     GENERAL FUND ENTERPRISE BUSINESS SYSTEM [GFEBS]                             9,963          27,163           9,963  ..............         -17,200
     FIREFINDER                                                                 20,517          20,517          20,517  ..............  ..............
     SOLDIER SYSTEMS--WARRIOR DEM/VAL                                           51,851          51,851          31,851         -20,000         -20,000
     ARTILLERY SYSTEMS                                                         167,797         167,797         167,797  ..............  ..............
     PATRIOT/MEADS COMBINED AGGREGATE PROGRAM [CAP]                            400,861  ..............         380,861         -20,000        +380,861
     NUCLEAR ARMS CONTROL MONITORING SENSOR NETWORK                              7,922           7,922           7,922  ..............  ..............
     INFORMATION TECHNOLOGY DEVELOPMENT                                         51,463          51,463          51,463  ..............  ..............
     ARMY INTEGRATED MILITARY HUMAN RESOURCES SYSTEM [A-IMH]                   158,646         158,646          96,546         -62,100         -62,100
     JOINT AIR-TO-GROUND MISSILE [JAGM]                                         10,000          10,000          10,000  ..............  ..............
     PAC-2/MSE MISSILE                                                          69,029          69,029          69,029  ..............  ..............
     ARMY INTEGRATED AIR AND MISSILE DEFENSE [AIAMD]                           277,374         277,374         277,374  ..............  ..............
     MANNED GROUND VEHICLE                                                     639,874         639,874         639,874  ..............  ..............
     AERIAL COMMON SENSOR                                                       47,426          47,426         118,026         +70,600         +70,600
     JOINT LIGHT TACTICAL VEHICLE ENG AND MANUFACTURING                         72,295          72,295          66,386          -5,909          -5,909
     TROJAN--RH12                                                                4,232           4,232           4,232  ..............  ..............
     ELECTRONIC WARFARE DEVELOPMENT                                             13,942          13,942          13,942  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, ENGINEERING & MANUFACTURING DEVELOPMENT                    3,286,629       2,897,968       2,997,054        -289,575         +99,086

     RDT&E MANAGEMENT SUPPORT
     THREAT SIMULATOR DEVELOPMENT                                               18,090          18,090          18,090  ..............  ..............
     TARGET SYSTEMS DEVELOPMENT                                                 14,034          14,034          14,034  ..............  ..............
     MAJOR T&E INVESTMENT                                                       37,394          37,394          50,394         +13,000         +13,000
     RAND ARROYO CENTER                                                         21,026          21,026          21,026  ..............  ..............
     ARMY KWAJALEIN ATOLL                                                      176,816         176,816         176,816  ..............  ..............
     CONCEPTS EXPERIMENTATION PROGRAM                                           27,902          27,902          27,902  ..............  ..............
     ARMY TEST RANGES AND FACILITIES                                           369,900         369,900         369,900  ..............  ..............
     ARMY TECHNICAL TEST INSTRUMENTATION AND TARGETS                            69,183          69,183          69,183  ..............  ..............
     SURVIVABILITY/LETHALITY ANALYSIS                                           44,753          44,753          44,753  ..............  ..............
     AIRCRAFT CERTIFICATION                                                      5,762           5,762           5,762  ..............  ..............
     METEOROLOGICAL SUPPORT TO RDT&E ACTIVITIES                                  7,402           7,402           7,402  ..............  ..............
     MATERIEL SYSTEMS ANALYSIS                                                  19,954          19,954          19,954  ..............  ..............
     EXPLOITATION OF FOREIGN ITEMS                                               5,535           5,535           5,535  ..............  ..............
     SUPPORT OF OPERATIONAL TESTING                                             67,789          67,789          70,789          +3,000          +3,000
     ARMY EVALUATION CENTER                                                     62,765          62,765          62,765  ..............  ..............
     SIMULATION & MODELING FOR ACQ, RQTS, & TNG [SMART]                          1,545           1,545           1,545  ..............  ..............
     PROGRAMWIDE ACTIVITIES                                                     83,422          83,422          83,422  ..............  ..............
     TECHNICAL INFORMATION ACTIVITIES                                           50,820          50,820          50,820  ..............  ..............
     MUNITIONS STANDARDIZATION, EFFECTIVENESS AND SAFETY                        46,763          56,763          46,763  ..............         -10,000
     ENVIRONMENTAL QUALITY TECHNOLOGY MGMT SUPPORT                               4,601           4,601           4,601  ..............  ..............
     MANAGEMENT HEADQUARTERS (RESEARCH AND DEVELOPMENT)                         18,524          18,524          18,524  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, RDT&E MANAGEMENT SUPPORT                                   1,153,980       1,163,980       1,169,980         +16,000          +6,000

     OPERATIONAL SYSTEMS DEVELOPMENT
     MLRS PRODUCT IMPROVEMENT PROGRAM                                          143,005         143,005         118,005         -25,000         -25,000
     PATRIOT PRODUCT IMPROVEMENT                                               109,978         109,978          39,978         -70,000         -70,000
     AEROSTAT JOINT PROJECT OFFICE                                             190,422         190,422         159,922         -30,500         -30,500
     ADV FIELD ARTILLERY TACTICAL DATA SYSTEM                                   32,556          32,556          32,556  ..............  ..............
     COMBAT VEHICLE IMPROVEMENT PROGRAMS                                       253,959         253,959         196,859         -57,100         -57,100
     MANEUVER CONTROL SYSTEM                                                    68,325          68,325          68,325  ..............  ..............
     AIRCRAFT MODIFICATIONS/PRODUCT IMPROVEMENT PROGRAMS                       280,247         226,147         216,047         -64,200         -10,100
     AIRCRAFT ENGINE COMPONENT IMPROVEMENT PROGRAM                                 898             898             898  ..............  ..............
     DIGITIZATION                                                               35,180          35,180          10,180         -25,000         -25,000
    1NETWORK INTEGRATED EVALUATION [NIE]                                ..............  ..............          28,200         +28,200         +28,200
     MISSILE/AIR DEFENSE PRODUCT IMPROVEMENT PROGRAM                            20,733          20,733          20,733  ..............  ..............
     TRACTOR CARD                                                               63,243          63,243          63,243  ..............  ..............
     JOINT TACTICAL GROUND SYSTEM                                               31,738          31,738          31,738  ..............  ..............
     JOINT HIGH SPEED VESSEL [JHSV]                                                 35              35              35  ..............  ..............
     SECURITY AND INTELLIGENCE ACTIVITIES                                        7,591           7,591           7,591  ..............  ..............
     INFORMATION SYSTEMS SECURITY PROGRAM                                       15,961          15,961          15,961  ..............  ..............
     GLOBAL COMBAT SUPPORT SYSTEM                                              120,927         120,927         120,927  ..............  ..............
     SATCOM GROUND ENVIRONMENT (SPACE)                                          15,756          15,756          15,756  ..............  ..............
     WWMCCS/GLOBAL COMMAND AND CONTROL SYSTEM                                   14,443          14,443          14,443  ..............  ..............
     TACTICAL UNMANNED AERIAL VEHICLES                                          31,303          31,303          28,503          -2,800          -2,800
     DISTRIBUTED COMMON GROUND/SURFACE SYSTEMS                                  40,876          40,876          40,876  ..............  ..............
     MQ-1 SKY WARRIOR A UAV                                                     74,618          74,618          74,618  ..............  ..............
     RQ-11 UAV                                                                   4,039           4,039           4,039  ..............  ..............
     RQ-7 UAV                                                                   31,158          31,158          31,158  ..............  ..............
     VERTICAL UAS                                                                2,387           2,387  ..............          -2,387          -2,387
     BIOMETRICS ENABLED INTELLIGENCE                                            15,248          15,248          15,248  ..............  ..............
     END ITEM INDUSTRIAL PREPAREDNESS ACTIVITIES                                59,908          59,908          59,908  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, OPERATIONAL SYSTEMS DEVELOPMENT                            1,664,534       1,610,434       1,415,747        -248,787        -194,687

     CLASSIFIED PROGRAMS                                                         4,628           4,628           4,628  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, RESEARCH, DEVELOPMENT, TEST & EVAL, ARMY                   8,929,415       8,593,055       8,427,588        -501,827        -165,467
--------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                 2013 budget       Committee       Change from
 Line                           Item                               estimate      recommendation  budget estimate
----------------------------------------------------------------------------------------------------------------
    5 Materials Technology                                            29,041           69,041          +40,000
          Materials research and technology                  ...............  ...............          +15,000
          Nanotechnology research                            ...............  ...............          +10,000
          Silicon carbide research                           ...............  ...............          +15,000
   20 Countermine Systems                                             18,850           33,850          +15,000
          Unexploded ordnance and landmine detection         ...............  ...............          +15,000
           research
   25 Military Engineering Technology                                 70,693           77,693           +7,000
          U.S. Army Corps of Engineers research              ...............  ...............           +7,000
   27 Warfighter Technology                                           28,281           58,281          +30,000
          Clothing and equipment technology                  ...............  ...............          +15,000
          Power generation and storage research              ...............  ...............          +15,000
   30 Medical Advanced Technology                                     69,580           77,580           +8,000
          Military Burn Research Program                     ...............  ...............           +8,000
   31 Aviation Advanced Technology                                    64,215           76,015          +11,800
          Transfer from line 72, only for fully funded 2nd   ...............  ...............          +11,800
           JMR demonstrator in accordance with Army
           acquisition strategy
   33 Combat Vehicle and Automotive Advanced Technology              104,359          144,359          +40,000
          Alternative energy research                        ...............  ...............          +40,000
   45 Missile and Rocket Advanced Technology                          71,111           90,111          +19,000
          Restore unjustified reduction                      ...............  ...............          +19,000
   47 High Performance Computing Modernization Program               180,582          228,182          +47,600
          Restore unjustified reduction                      ...............  ...............          +47,600
   60 Soldier Support and Survivability                               10,073            4,014           -6,059
          C08: unjustified request                           ...............  ...............           -6,059
   64 Warfighter Information Network-Tactical--DEM/VAL               278,018          171,418         -106,600
          Increment III excessive growth                     ...............  ...............         -100,000
          Management Services--excessive growth              ...............  ...............           -6,600
   72 Technology Maturation Initiatives                               24,868            2,197          -22,671
          Transfer to line 31                                ...............  ...............          -11,800
          Analysis of Alternatives--Transfer to line 72A     ...............  ...............          -10,871
  72A Analysis of Alternatives                               ...............           10,871          +10,871
          Analysis of Alternatives--Transfer from line 72    ...............  ...............          +10,871
   75 Indirect Fire Protection Capability Increment 2-                76,039           28,829          -47,210
       Intercept [IFPC2]
          Technology development contract award delays       ...............  ...............          -47,210
   78 Endurance UAVs                                                  26,196  ...............          -26,196
          Fielding delays                                    ...............  ...............           -5,999
          Transfer to Title IX: LEMV military utility        ...............  ...............          -20,197
           assessment in theater
   79 Aircraft Avionics                                               78,538           50,038          -28,500
          Transfer to Title IX: DVE ONS                      ...............  ...............          -28,500
   81 Electronic Warfare Development                                 181,347          128,247          -53,100
          CIRCM TD delays                                    ...............  ...............          -53,100
   83 Midtier Networking Vehicular Radio [MNVR]                       12,636            2,636          -10,000
          Funded via Prior Approval Above Threshold          ...............  ...............          -10,000
           Reprogramming Fiscal Year 12-14
   85 TRACTOR CAGE                                                    32,095            5,095          -27,000
          Lack of requirements                               ...............  ...............          -27,000
   86 Infantry Support Weapons                                        96,478           89,678           -6,800
          S61--Increment 1b program adjustment               ...............  ...............           -6,800
   92 Tactical Unmanned Ground Vehicle [TUGV]                         13,141  ...............          -13,141
          Lack of competitive acquisition strategy           ...............  ...............          -13,141
  103 Air Defense Command, Control and Intelligence--Eng              73,333           48,408          -24,925
       Dev
          Interceptor enhancements--program terminated by    ...............  ...............          -24,925
           Army
  113 Landmine Warfare/Barrier--Eng Dev                              104,983           44,483          -60,500
          HMDS contract award delays and change to           ...............  ...............          -40,000
           acquisition strategy
          EHP--Army requested adjustment                     ...............  ...............          -10,600
          RCIS program delays                                ...............  ...............           -5,400
          AMDS contract award delays                         ...............  ...............           -4,500
  116 Army Tactical Command & Control Hardware and Software           77,223           49,023          -28,200
          C34: Transfer to line 169A for NIE Technology      ...............  ...............          -28,200
           Transition
  120 Soldier Systems--Warrior Dem/Val                                51,851           31,851          -20,000
          S75--excessive new hardware and software           ...............  ...............          -20,000
           development, integration, and evaluation
  122 Patriot/MEADS Combined Aggregate Program [CAP]                 400,861          380,861          -20,000
          Program adjustment                                 ...............  ...............         -400,861
          Completion of Proof of Concept or termination      ...............  ...............         +348,000
           liability required by paragraph 19.5.2 of
           Memorandum of Understanding if certified by the
           Secretary of Defense
          US MEADS National Program Office                   ...............  ...............          +52,861
          US MEADS National Program Office reduction         ...............  ...............          -20,000
  125 Integrated Personnel and Pay System-Army [IPPS-A]              158,646           96,546          -62,100
          IPPS-A execution delays and Increment II           ...............  ...............          -62,100
           concurrency
  131 Aerial Common Sensor                                            47,426          118,026          +70,600
          Transfer from Aircraft Procurement, Army, line 18  ...............  ...............          +46,900
           only to exercise option for two additional EMD
           aircraft, as requested by Army
          Program increase--only to fully fund EMD           ...............  ...............          +23,700
  132 Joint Light Tactical Vehicle [JLTV] Engineering and             72,295           66,386           -5,909
       Manufacturing Development Ph
          Two-month contract award delay                     ...............  ...............           -5,909
  137 Major T&E Investment                                            37,394           50,394          +13,000
          Program increase--restore unjustified reduction    ...............  ...............          +13,000
  150 Support of Operational Testing                                  67,789           70,789           +3,000
          Program increase--restore unjustified reduction    ...............  ...............           +3,000
  159 MLRS Product Improvement Program                               143,005          118,005          -25,000
          Fire Control System--forward financing             ...............  ...............          -25,000
  161 Patriot Product Improvement                                    109,978           39,978          -70,000
          Growth without acquisition strategy                ...............  ...............          -70,000
  162 Aerostat Joint Project Office                                  190,422          159,922          -30,500
          COCOM exercise--funds requested early to need      ...............  ...............          -30,500
  165 Combat Vehicle Improvement Programs                            253,959          196,859          -57,100
          DS5: Funds requested prematurely for fiscal year   ...............  ...............          -57,100
           2014 contract award
  167 Aircraft Modifications/Product Improvement Programs            280,247          216,047          -64,200
          Project 504: ITEP ahead of need                    ...............  ...............          -64,200
  169 Digitization                                                    35,180           10,180          -25,000
          Transfer to Other Procurement, Army for Non-       ...............  ...............          -25,000
           Developmental Emerging Technologies, as
           requested by Army
 169A Network Integrated Evaluation [NIE] Technology         ...............           28,200          +28,200
       Transition
          Transfer from line 116, C34, only for NIE          ...............  ...............          +28,200
           Technology transition
  182 Tactical Unmanned Aerial Vehicles                               31,303           28,503           -2,800
          11B: TSP Increment II funding ahead of need        ...............  ...............           -2,800
  187 Vertical UAS                                                     2,387  ...............           -2,387
          Lack of justification                              ...............  ...............           -2,387
----------------------------------------------------------------------------------------------------------------

    Joint Multi-Role Program [JMR].--The fiscal year 2013 
budget request includes $11,800,000 in the Aviation Advanced 
Technology line to initiate the development of a Joint Multi-
Role [JMR] demonstrator. The Committee notes that the Army's 
acquisition strategy calls for funding two competitively 
awarded demonstrators; however, only one demonstrator is fully 
budgeted for in this line. The Committee understands that the 
Army intends to transfer the funds required for a second 
demonstrator to the Aviation Advanced Technology line in the 
year of execution. The Committee notes that this is an 
inappropriate and risky method to initiate and fund the Army's 
next major aviation acquisition program, and recommends funding 
both demonstrators in the same line by transferring the 
required fiscal year 2013 funds. Further, the Committee directs 
that no funds may be obligated or expended for a JMR 
demonstrator in fiscal year 2013 until the Deputy Assistant 
Secretary of the Army for Research and Technology certifies in 
writing to the congressional defense committees that the JMR 
demonstrator program is fully and appropriately budgeted for in 
accordance with the Army's acquisition strategy.
    Combat Vehicle Modernization Affordability.--The fiscal 
year 2013 budget request includes $893,900,000 in Research, 
Development, Test and Evaluation, Army, program elements 
0603653A, 0605625A, and 0203735A, for the modernization of the 
Army's combat vehicles, to include Stryker, Bradley, Abrams, 
the Armored Multi-Purpose Vehicle [AMPV] and the Ground Combat 
Vehicle [GCV]. This includes $639,900,000, over 70 percent, for 
the GCV. The Committee notes that programmatic and funding 
requirements for the remainder of the combat vehicle fleet have 
not been held stable. For example, the fiscal year 2013 budget 
request terminates the Stryker Modernization program after 5 
years and an investment in excess of $250,000,000. Instead, the 
Army intends to execute Stryker modernization through 
Engineering Change Proposals [ECPs]; however, the Committee 
notes that there is no funding programmed across the Future 
Years Defense Program [FYDP] for a Stryker ECP.
    The Committee notes that the Army has programmed more than 
80 percent of its combat vehicle modernization budget over the 
next 5 years for the ground combat vehicle, which will 
eventually make up roughly 10 percent of the Army's combat 
vehicle fleet. The Committee is concerned that the Army is not 
adequately budgeting for modernization efforts for a large 
portion of the fleet. The Committee understands that the Army 
is conducting a business case analysis on future improvements 
of its combat vehicle fleet and directs the Secretary of the 
Army to provide the findings of this analysis to the 
congressional defense committees with the fiscal year 2014 
budget submission.
    Warfighter Information Network--Tactical [WIN-T].--The 
fiscal year 2013 budget request includes $275,232,000 for WIN-T 
Increment III, an increase of $99,544,000 over amounts 
appropriated in fiscal year 2012. A proposal made by the Army 
to accelerate the program following a rebaselining necessitated 
by a previous Nunn-McCurdy breach was denied by the Congress in 
fiscal year 2012, and the Army subsequently restructured the 
program. In addition, the Army is exploring alternate programs 
at the Network Integration Evaluation [NIE] that could deliver 
the necessary WIN-T Increment III capabilities to the 
warfighter at a lower cost. Therefore, the Committee finds it 
premature to request such a significant budget increase and 
recommends a reduction of $106,600,000 that includes a 
corresponding reduction of proposed program office growth. This 
recommendation continues to fund WIN-T Increment III 
development at the current level.
    Analyses of Alternatives [AoA].--The fiscal year 2013 
budget request includes $10,871,000 within program element 
0604115A for Analyses of Alternatives. As previously stated in 
Senate Report 112-77, the Committee believes that these funds 
should be requested in a separate program element. Therefore, 
consistent with the recommendation contained in House Report 
112-284, the Joint Explanatory Statement of the Committee of 
Conference to accompany Public Law 112-74, the Department of 
Defense Appropriations Act, 2012, the Committee again 
recommends transferring these funds to a separate line, and 
directs the Army to follow this approach in future budget 
submissions. Further, the Committee directs that none of these 
funds may be obligated or expended to initiate an Analysis of 
Alternatives without 30-day prior notification to the 
congressional defense committees identifying the purpose of the 
AoA and certifying its full funding.
    Degraded Visual Environment [DVE].--The fiscal year 2013 
budget request includes $28,500,000 for a DVE capability in 
response to an operational need. The Committee notes that the 
capability developed in response to the operational need will 
not be fielded to an operational unit until fiscal year 2015. 
Therefore, the Committee questions the operational relevance of 
this development effort to the current war in Afghanistan. 
However, given the Department's long-standing concern with DVE, 
the Committee supports the operational need in the near term 
and recommends $12,300,000 for this effort, the amount 
identified by the Army as required in fiscal year 2013.
    In addition, the budget request includes $15,000,000 to 
initiate a DVE program of record in fiscal year 2013. The 
Committee notes that the acquisition strategy for the program 
of record is pre-decisional; however, the Committee believes 
that this program should be developed and funded as an enduring 
capability instead of the ad hoc approach that the Department 
has undertaken to date. Therefore, the Committee recommends 
full funding for the program of record. Furthermore, the 
Committee understands that a capability to improve aviation 
safety and survivability by incorporating rotary wing 
performance mission planning tools is under consideration for 
inclusion in the program of record and encourages the Army to 
examine the benefits of these tools for increased 
survivability.
    Modernized Expanded Capacity Vehicle [MECV].--Based on Army 
identified requirements, Congress provided $20,000,000 in 
Public Law 112-74, the Department of Defense Appropriations 
Act, 2012, specifically to continue the MECV program. The Army 
subsequently terminated the program and requested no funding in 
the fiscal year 2013 budget. The Committee understands that 
with funds appropriated in fiscal year 2012, the Army intends 
to complete the initial phase of the MECV program to assess 
current light tactical vehicle survivability technologies 
through vehicle testing and modeling and simulation efforts 
only. The Committee believes the MECV test program as 
originally proposed would provide a more complete data set 
against which to assess the technologies and strongly urges the 
Army to conduct more extensive testing as originally proposed 
to the Committee by the Army. The Committee directs the Army to 
provide the results of this testing in writing to the 
congressional defense committees within 60 days of its 
completion. Further, the Committee directs the Director of 
Operational Test and Evaluation to provide to the congressional 
defense committees in writing his observations and findings 
regarding the test parameters and test execution, as well as an 
assessment of these technologies in comparison to other light 
tactical vehicle survivability efforts.
    Joint Land Attack Cruise Missile Defense Elevated Netted 
Sensor [JLENS].--The fiscal year 2013 budget request includes 
$30,500,000 for a JLENS Combatant Command Exercise. The 
Committee notes that the congressional defense committees 
previously approved an above threshold reprogramming request of 
$40,350,000 for this purpose at the end of fiscal year 2011. 
Subsequently, the Army determined that those funds were 
requested ahead of need for numerous reasons, and is seeking to 
again reprogram those funds for higher Army priorities.
    In the fiscal year 2013 budget submission, the Army 
proposes to cancel its planned procurement of JLENS and to 
conclude the program of record following completion of the 
Engineering and Manufacturing Development [EMD] phase in fiscal 
year 2014. The Committee understands that any Combatant Command 
Exercise would not occur until after the orderly conclusion of 
the EMD phase in fiscal year 2014. Further, the Committee 
understands that many details of this exercise, to include the 
location, scope and a comprehensive cost estimate have yet to 
be determined. The Committee notes that no operation and 
maintenance or military construction funds have been budgeted 
for a Combatant Command Exercise, which, according to previous 
estimates, could cost in excess of $250,000,000. Therefore, 
while the Committee maintains its strong support for Combatant 
Commanders' unfunded requirements, the Committee concludes that 
the funds requested in Research, Development, Test and 
Evaluation, Army for a Combatant Command Exercise in fiscal 
year 2013 are early to need and recommends no funds for that 
purpose.
    Medium Extended Air Defense System [MEADS].--The fiscal 
year 2013 budget request includes $400,861,000 for MEADS, a 
tri-national ground-based air and terminal ballistic missile 
defense program among the United States of America, Germany, 
and Italy. This request would fund the second and final year of 
a MEADS Proof of Concept and bring the MEADS development 
program to a close. Under the Proof of Concept, the program 
would complete verification and testing of the 360-degree 
multifunction fire control radar and would verify the ability 
of the PAC-3 Missile Segment Enhancement [MSE] missile to 
intercept targets from the lightweight, near-vertical launcher; 
document the specifications, performance characteristics, and 
capabilities of all system elements; and would conduct two 
intercept flight tests. The Committee notes that per the report 
submitted to Congress by the Under Secretary of Defense for 
Acquisition, Technology and Logistics in accordance with 
Section 235 of Public Law 112-81, the National Defense 
Authorization Act for Fiscal Year 2012, the fiscal year 2013 
U.S. contribution to the MEADS Proof of Concept is 
$348,000,000, and that the balance of the fiscal year 2013 
request is for program office activities.
    As an alternative to completing the Proof of Concept, as 
requested in the fiscal year 2013 budget submission, the 
Committee understands that the U.S. could potentially seek to 
end its involvement in the MEADS program after fiscal year 
2012. The Committee has been informed by the Department that 
should the United States decide to pursue this course of 
action, it would seek to enter a dispute settlement process 
with the MEADS partners to avoid having to pay termination 
liability for unilateral early withdrawal from the MEADS 
program per paragraph 19.5.2 of the MEADS Memorandum of 
Understanding [MOU]. The Committee notes that over the course 
of the past year, numerous attempts by the Department to 
renegotiate the MOU and to jointly conclude the MEADS program 
after fiscal year 2012 have been rebuffed by the partners. 
Further, the Committee has been informed that the partners 
would consider failure of the United States to contribute its 
fiscal year 2013 MEADS share as required under the MOU a 
unilateral withdrawal from the program, which would trigger a 
termination liability funding requirement. The Committee 
understands that the U.S. termination liability requirement 
would likely be equal to, but not greater than, the 
$348,000,000 required to conclude the Proof of Concept.
    The Committee notes that the payment of termination 
liability for terminated programs is standard practice and 
enables the Government to retain technical data rights and 
harvest technologies and end-items for future U.S. 
requirements, including Combatant Command needs. For example, 
to date, the Department of Defense has paid more than 
$470,000,000 following termination of the Army's Future Combat 
Systems [FCS] program, which has enabled the transition of 
certain technologies developed under FCS to other programs. 
Similarly, the Secretary of Defense and the Chief of Staff of 
the Army have identified several technologies that the 
Department would seek to transition from the MEADS program to 
other U.S. air and missile defense programs upon conclusion of 
the Proof of Concept. The Committee has been informed, however, 
that access to these technologies is dependent on bringing the 
MEADS program to an orderly close by either completing the 
Proof of Concept as agreed to or by closing out the program 
following cessation of activities with the payment of 
termination liability.
    Therefore, the Committee recommends sufficient funding to 
either conclude the MEADS Proof of Concept, as requested by the 
Department of Defense in the fiscal year 2013 budget 
submission, or to cover termination liability costs required by 
paragraph 19.5.2 of the MOU, if the Secretary of Defense 
certifies to the congressional defense committees that 
withdrawing from the MEADS MOU is in the national interest of 
the United States. The Committee directs that none of these 
funds may be obligated or expended for termination liability 
until 30 days after the Secretary of Defense notifies the 
congressional defense committees about the details of any such 
termination liability requirements.
    Enhanced Medium Altitude Reconnaissance and Surveillance 
System [EMARSS].--The fiscal year 2013 budget request includes 
$47,246,000 in Research, Development, Test and Evaluation, Army 
to conclude the development of EMARSS during fiscal year 2013. 
The Committee notes that the Army has adjusted its acquisition 
strategy and no longer plans to procure the original 
acquisition objective of 36 aircraft. The Committee has been 
informed that the Army's revised acquisition strategy is 
underfunded, and recommends an additional $70,600,000 in 
Research, Development, Test and Evaluation, Army for EMARSS. 
The Committee notes that this fully funds the Engineering and 
Manufacturing Development [EMD] phase, to include exercising 
the option for two additional aircraft, as requested by the 
Army.
    Microtechnology Energy.--The Committee understands that the 
Department of Defense continues its focus on developing 
sustainable energy technologies that provide strategic 
effectiveness and energy security in the areas of energy 
supply, demand and assured distribution. The Committee believes 
that continued research into these technologies is necessary to 
develop a wide range of micro- and nanotechnology-enabled 
mobile military energy technologies. Therefore, the Committee 
encourages the Department to continue research related to micro 
technology energy.
    Prototype Integration Facility [PIF].--The Army Prototype 
Integration Facility [PIF] remains a key, award-winning 
enterprise asset. The Committee notes that since 2002, the PIF 
has executed in excess of $2,600,000,000 in rapid response, 
quick reaction, and high-priority weapons system hardware and 
services support to the warfighter. The PIF does not receive 
mission or program budget funds and relies on customer funding 
to execute specific weapon system program requirements. The 
Committee encourages the Army to continue to support upgrades 
to the PIF, including an enterprise resource planning system 
that will increase productivity, reduce overall costs, improve 
schedules and tracking, enhance cost accountability, and 
support multiple warfighter rapid response tasks.
    Soldier-Worn Battery Technology.--The Committee encourages 
the Department to continue to develop and improve soldier-worn 
technology that reduces the weight a soldier carries while also 
integrating force protection equipment and electronics to 
reduce power consumption in combat situations.
    Blast-Resistant Fuel Tanks.--The Committee understands that 
the Army has launched an occupant-centric survivability 
technology development program aimed at increasing 
survivability for all major vehicle systems, to include fuel 
systems. The Committee encourages the Army to develop blast-
resistant fuel tank technologies leveraging fully modernized 
technologies for its combat vehicles modernization and reset.

            Research, Development, Test and Evaluation, Navy

Appropriations, 2012.................................... $17,753,940,000
Budget estimate, 2013...................................  16,882,877,000
House allowance.........................................  16,987,768,000
Committee recommendation................................  16,646,307,000

    The Committee recommends an appropriation of 
$16,646,307,000. This is $236,570,000 below the budget 
estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                [In thousands of dollars]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2013 budget        House         Committee   -------------------------------
                                         Item                                estimate        allowance    recommendation      Budget           House
                                                                                                                             estimate        allowance
--------------------------------------------------------------------------------------------------------------------------------------------------------
                  RESEARCH, DEVELOPMENT, TEST & EVAL, NAVY

     BASIC RESEARCH
     UNIVERSITY RESEARCH INITIATIVES                                           113,690         133,690         113,690  ..............         -20,000
     IN-HOUSE LABORATORY INDEPENDENT RESEARCH                                   18,261          18,261          18,261  ..............  ..............
     DEFENSE RESEARCH SCIENCES                                                 473,070         473,070         483,070         +10,000         +10,000
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BASIC RESEARCH                                               605,021         625,021         615,021         +10,000         -10,000

     APPLIED RESEARCH
     POWER PROJECTION APPLIED RESEARCH                                          89,189          89,189          99,189         +10,000         +10,000
     FORCE PROTECTION APPLIED RESEARCH                                         143,301         143,301         213,301         +70,000         +70,000
     MARINE CORPS LANDING FORCE TECHNOLOGY                                      46,528          46,528          46,528  ..............  ..............
     COMMON PICTURE APPLIED RESEARCH                                            41,696          41,696          41,696  ..............  ..............
     WARFIGHTER SUSTAINMENT APPLIED RESEARCH                                    44,127          44,127          44,127  ..............  ..............
     ELECTROMAGNETIC SYSTEMS APPLIED RESEARCH                                   78,228          78,228          78,228  ..............  ..............
     OCEAN WARFIGHTING ENVIRONMENT APPLIED RESEARCH                             49,635          64,635          49,635  ..............         -15,000
     JOINT NON-LETHAL WEAPONS APPLIED RESEARCH                                   5,973           5,973           5,973  ..............  ..............
     UNDERSEA WARFARE APPLIED RESEARCH                                          96,814          96,814          96,814  ..............  ..............
     FUTURE NAVAL CAPABILITIES ADVANCED TECHNOLOGY DEV                         162,417         162,417         162,417  ..............  ..............
     MINE AND EXPEDITIONARY WARFARE APPLIED RESEARCH                            32,394          32,394          32,394  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, APPLIED RESEARCH                                             790,302         805,302         870,302         +80,000         +65,000

     ADVANCED TECHNOLOGY DEVELOPMENT
     POWER PROJECTION ADVANCED TECHNOLOGY                                       56,543          56,543          56,543  ..............  ..............
     FORCE PROTECTION ADVANCED TECHNOLOGY                                       18,616          18,616          18,616  ..............  ..............
     ELECTROMAGNETIC SYSTEMS ADVANCED TECHNOLOGY                                54,858          54,858          64,858         +10,000         +10,000
     MARINE CORPS ADVANCED TECHNOLOGY DEMONSTRATION [ATD]                      130,598         130,598         130,598  ..............  ..............
     JOINT NON-LETHAL WEAPONS TECHNOLOGY DEVELOPMENT                            11,706          11,706          11,706  ..............  ..............
     FUTURE NAVAL CAPABILITIES ADVANCED TECHNOLOGY DEV                         256,382         256,382         293,382         +37,000         +37,000
     WARFIGHTER PROTECTION ADVANCED TECHNOLOGY                                   3,880          42,580           3,880  ..............         -38,700
     UNDERSEA WARFARE ADVANCED TECHNOLOGY                               ..............          10,000  ..............  ..............         -10,000
     NAVY WARFIGHTING EXPERIMENTS AND DEMONSTRATIONS                            51,819          51,819          51,819  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, ADVANCED TECHNOLOGY DEVELOPMENT                              584,402         633,102         631,402         +47,000          -1,700

     DEMONSTRATION & VALIDATION
     AIR/OCEAN TACTICAL APPLICATIONS                                            34,085          34,085          34,085  ..............  ..............
     AVIATION SURVIVABILITY                                                      8,783           8,783           8,783  ..............  ..............
     DEPLOYABLE JOINT COMMAND AND CONTROL                                        3,773           3,773           3,773  ..............  ..............
     AIRCRAFT SYSTEMS                                                           24,512          24,512          24,512  ..............  ..............
     ASW SYSTEMS DEVELOPMENT                                                     8,090           8,090           8,090  ..............  ..............
     TACTICAL AIRBORNE RECONNAISSANCE                                            5,301           5,301           5,301  ..............  ..............
     ADVANCED COMBAT SYSTEMS TECHNOLOGY                                          1,506           1,506           1,506  ..............  ..............
     SURFACE AND SHALLOW WATER MINE COUNTERMEASURES                            190,622         160,622         188,622          -2,000         +28,000
     SURFACE SHIP TORPEDO DEFENSE                                               93,346          93,346          93,346  ..............  ..............
     CARRIER SYSTEMS DEVELOPMENT                                               108,871         108,871         108,871  ..............  ..............
     PILOT FISH                                                                101,169         101,169         101,169  ..............  ..............
     RETRACT LARCH                                                              74,312          74,312          74,312  ..............  ..............
     RETRACT JUNIPER                                                            90,730          90,730          90,730  ..............  ..............
     RADIOLOGICAL CONTROL                                                          777             777             777  ..............  ..............
     SURFACE ASW                                                                 6,704           2,495           6,704  ..............          +4,209
     ADVANCED SUBMARINE SYSTEM DEVELOPMENT                                     555,123         555,123          77,028        -478,095        -478,095
     OHIO REPLACEMENT PROGRAM                                           ..............  ..............         483,095        +483,095        +483,095
     SUBMARINE TACTICAL WARFARE SYSTEMS                                          9,368           9,368           9,368  ..............  ..............
     SHIP CONCEPT ADVANCED DESIGN                                               24,609          24,609          24,609  ..............  ..............
     SHIP PRELIMINARY DESIGN & FEASIBILITY STUDIES                              13,710           9,810          43,710         +30,000         +33,900
     ADVANCED NUCLEAR POWER SYSTEMS                                            249,748         249,748         249,748  ..............  ..............
     ADVANCED SURFACE MACHINERY SYSTEMS                                         29,897          29,897          29,897  ..............  ..............
     CHALK EAGLE                                                               509,988         509,988         499,988         -10,000         -10,000
     LITTORAL COMBAT SHIP [LCS]                                                429,420         401,620         416,920         -12,500         +15,300
     COMBAT SYSTEM INTEGRATION                                                  56,551          56,551          50,551          -6,000          -6,000
     CONVENTIONAL MUNITIONS                                                      7,342           7,342           7,342  ..............  ..............
     MARINE CORPS ASSAULT VEHICLES                                              95,182          95,182          83,182         -12,000         -12,000
     MARINE CORPS GROUND COMBAT/SUPPORT SYSTEM                                  10,496          10,496          10,496  ..............  ..............
     JOINT SERVICE EXPLOSIVE ORDNANCE DEVELOPMENT                               52,331          38,331          52,331  ..............         +14,000
     COOPERATIVE ENGAGEMENT                                                     56,512          56,512          56,512  ..............  ..............
     OCEAN ENGINEERING TECHNOLOGY DEVELOPMENT                                    7,029           7,029           7,029  ..............  ..............
     ENVIRONMENTAL PROTECTION                                                   21,080          21,080          21,080  ..............  ..............
     NAVY ENERGY PROGRAM                                                        55,324          95,324          55,324  ..............         -40,000
     FACILITIES IMPROVEMENT                                                      3,401           3,401           3,401  ..............  ..............
     CHALK CORAL                                                                45,966          45,966          45,966  ..............  ..............
     NAVY LOGISTIC PRODUCTIVITY                                                  3,811           3,811           3,811  ..............  ..............
     RETRACT MAPLE                                                             341,305         341,305         341,305  ..............  ..............
     LINK PLUMERIA                                                             181,220         181,220         181,220  ..............  ..............
     RETRACT ELM                                                               174,014         174,014         162,014         -12,000         -12,000
     LINK EVERGREEN                                                             68,654          68,654          68,654  ..............  ..............
     SPECIAL PROCESSES                                                          44,487          44,487          44,487  ..............  ..............
     NATO RESEARCH AND DEVELOPMENT                                               9,389           9,389           9,389  ..............  ..............
     LAND ATTACK TECHNOLOGY                                                     16,132          16,132          16,132  ..............  ..............
     NONLETHAL WEAPONS                                                          44,994          44,994          44,994  ..............  ..............
     JOINT PRECISION APPROACH AND LANDING SYSTEMS                              137,369         137,369         135,454          -1,915          -1,915
     TACTICAL AIR DIRECTIONAL INFRARED COUNTERMEASURES                          73,934          73,934          73,934  ..............  ..............
     ASE SELF-PROTECTION OPTIMIZATION                                              711             711             711  ..............  ..............
     JOINT COUNTER RADIO CONTROLLED IED ELECTRONIC WARFARE.                     71,300          51,300          51,426         -19,874            +126
     PRECISION STRIKE WEAPONS DEVELOPMENT PROGRAM                                5,654           5,654           5,654  ..............  ..............
     SPACE & ELECTRONIC WARFARE [SEW] ARCHITECTURE/ENGINE                       31,549          31,549          28,949          -2,600          -2,600
     OFFENSIVE ANTI-SURFACE WARFARE WEAPON DEVELOPMENT                          86,801          86,801          86,801  ..............  ..............
     JOINT LIGHT TACTICAL VEHICLE ENGINEERING/MANUFACTURING                     44,500          44,500          38,591          -5,909          -5,909
     ASW SYSTEMS DEVELOPMENT--MIP                                               13,172          13,172          13,172  ..............  ..............
     ELECTRONIC WARFARE DEVELOPMENT--MIP                                           643             643             643  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, DEMONSTRATION & VALIDATION                                 4,335,297       4,275,388       4,285,499         -49,798         +10,111

     ENGINEERING & MANUFACTURING DEVELOPMENT
     OTHER HELO DEVELOPMENT                                                     33,978          24,978          33,978  ..............          +9,000
     AV-8B AIRCRAFT--ENG DEV                                                    32,789          32,789          17,535         -15,254         -15,254
     STANDARDS DEVELOPMENT                                                      84,988          82,988          76,988          -8,000          -6,000
     MULTI-MISSION HELICOPTER UPGRADE DEVELOPMENT                                6,866           6,866           6,866  ..............  ..............
     AIR/OCEAN EQUIPMENT ENGINEERING                                             4,060           4,060           4,060  ..............  ..............
     P-3 MODERNIZATION PROGRAM                                                   3,451           3,451           3,451  ..............  ..............
     WARFARE SUPPORT SYSTEM                                                     13,071          13,071          11,071          -2,000          -2,000
     TACTICAL COMMAND SYSTEM                                                    71,645          71,645          71,645  ..............  ..............
     ADVANCED HAWKEYE                                                          119,065         119,065         129,065         +10,000         +10,000
     H-1 UPGRADES                                                               31,105          31,105          31,105  ..............  ..............
     ACOUSTIC SEARCH SENSORS                                                    34,299          34,299          34,299  ..............  ..............
     V-22A                                                                      54,412          45,412          54,412  ..............          +9,000
     AIR CREW SYSTEMS DEVELOPMENT                                                2,717           2,717           2,717  ..............  ..............
     EA-18                                                                      13,009          13,009          13,009  ..............  ..............
     ELECTRONIC WARFARE DEVELOPMENT                                             51,304          51,304          51,304  ..............  ..............
     VH-71A EXECUTIVE HELO DEVELOPMENT                                          61,163          41,163          61,163  ..............         +20,000
     NEXT GENERATION JAMMER [NGJ]                                              187,024         187,024         167,024         -20,000         -20,000
     JOINT TACTICAL RADIO SYSTEM--NAVY [JTRS-NAVY]                             337,480         257,480         337,480  ..............         +80,000
     SURFACE COMBATANT COMBAT SYSTEM ENGINEERING                               260,616         260,616         260,616  ..............  ..............
     LPD-17 CLASS SYSTEMS INTEGRATION                                              824             824             824  ..............  ..............
     SMALL DIAMETER BOMB [SDB]                                                  31,064          31,064          31,064  ..............  ..............
     STANDARD MISSILE IMPROVEMENTS                                              63,891          58,391          43,891         -20,000         -14,500
     AIRBORNE MCM                                                               73,246          73,246          66,996          -6,250          -6,250
     MARINE AIR GROUND TASK FORCE ELECTRONIC WARFARE                            10,568          10,568          10,568  ..............  ..............
     NAVAL INTEGRATED FIRE CONTROL-COUNTER AIR SYSTEMS ENG                      39,974          39,974          39,974  ..............  ..............
     FUTURE UNMANNED CARRIER-BASED STRIKE SYSTEM                               122,481         122,481         102,481         -20,000         -20,000
     ADVANCED ABOVE WATER SENSORS                                              255,516         255,516          41,895        -213,621        -213,621
    1AIR AND MISSILE DEFENSE RADAR                                      ..............  ..............         223,621        +223,621        +223,621
     SSN-688 AND TRIDENT MODERNIZATION                                          82,620          82,620          82,620  ..............  ..............
     AIR CONTROL                                                                 5,633           5,633           5,633  ..............  ..............
     SHIPBOARD AVIATION SYSTEMS                                                 55,826          55,826          55,826  ..............  ..............
     COMBAT INFORMATION CENTER CONVERSION                                          918             918             918  ..............  ..............
     NEW DESIGN SSN                                                            165,230         180,230          75,230         -90,000        -105,000
     SUBMARINE TACTICAL WARFARE SYSTEM                                          49,141          49,141          49,141  ..............  ..............
     SHIP CONTRACT DESIGN/LIVE FIRE T&E                                        196,737         176,737         196,737  ..............         +20,000
     NAVY TACTICAL COMPUTER RESOURCES                                            3,889           3,889           3,889  ..............  ..............
     MINE DEVELOPMENT                                                            8,335           8,335           8,335  ..............  ..............
     LIGHTWEIGHT TORPEDO DEVELOPMENT                                            49,818          59,818          36,452         -13,366         -23,366
     JOINT SERVICE EXPLOSIVE ORDNANCE DEVELOPMENT                               10,099          10,099           8,099          -2,000          -2,000
     PERSONNEL, TRAINING, SIMULATION, AND HUMAN FACTORS                          7,348           7,348           5,348          -2,000          -2,000
     JOINT STANDOFF WEAPON SYSTEMS                                               5,518           5,518           5,518  ..............  ..............
     SHIP SELF DEFENSE (DETECT & CONTROL)                                       87,662          87,662          87,662  ..............  ..............
     SHIP SELF DEFENSE (ENGAGE: HARD KILL)                                      64,079          64,079          64,079  ..............  ..............
     SHIP SELF DEFENSE (ENGAGE: SOFT KILL/EW)                                  151,489         151,489         139,489         -12,000         -12,000
     MEDICAL DEVELOPMENT                                                        12,707          41,707          12,707  ..............         -29,000
     NAVIGATION/ID SYSTEM                                                       47,764          47,764          41,764          -6,000          -6,000
     JOINT STRIKE FIGHTER [JSF]--EMD                                           737,149         733,949         722,149         -15,000         -11,800
     JOINT STRIKE FIGHTER [JSF]                                                743,926         740,726         720,209         -23,717         -20,517
     INFORMATION TECHNOLOGY DEVELOPMENT                                         12,143          12,143          12,143  ..............  ..............
     INFORMATION TECHNOLOGY DEVELOPMENT                                         72,209          72,209          72,209  ..............  ..............
     CH-53K                                                                    606,204         606,204         606,204  ..............  ..............
     MULTI-MISSION MARITIME AIRCRAFT [MMA]                                     421,102         436,102         394,102         -27,000         -42,000
     DDG-1000                                                                  124,655         124,655         124,655  ..............  ..............
     TACTICAL COMMAND SYSTEM--MIP                                                1,170           1,170           1,170  ..............  ..............
     TACTICAL CRYPTOLOGIC SYSTEMS                                               23,255          23,255          23,255  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, ENGINEERING & MANUFACTURING DEVELOPMENT                    5,747,232       5,664,332       5,484,645        -262,587        -179,687

     RDT&E MANAGEMENT SUPPORT
     THREAT SIMULATOR DEVELOPMENT                                               30,790          30,790          30,790  ..............  ..............
     TARGET SYSTEMS DEVELOPMENT                                                 59,221          59,221          59,221  ..............  ..............
     MAJOR T&E INVESTMENT                                                       35,894          35,894          35,894  ..............  ..............
     JOINT THEATER AIR AND MISSILE DEFENSE ORGANIZATION                          7,573           7,573           6,573          -1,000          -1,000
     STUDIES AND ANALYSIS SUPPORT--NAVY                                         20,963          20,963          17,963          -3,000          -3,000
     CENTER FOR NAVAL ANALYSES                                                  46,856          46,856          46,856  ..............  ..............
     TECHNICAL INFORMATION SERVICES                                                796             796             796  ..............  ..............
     MANAGEMENT, TECHNICAL & INTERNATIONAL SUPPORT                              32,782          32,782          47,782         +15,000         +15,000
     STRATEGIC TECHNICAL SUPPORT                                                 3,306           3,306           3,306  ..............  ..............
     RDT&E SCIENCE AND TECHNOLOGY MANAGEMENT                                    70,302          70,302          70,302  ..............  ..............
     RDT&E SHIP AND AIRCRAFT SUPPORT                                           144,033         144,033         144,033  ..............  ..............
     TEST AND EVALUATION SUPPORT                                               342,298         372,298         342,298  ..............         -30,000
     OPERATIONAL TEST AND EVALUATION CAPABILITY                                 16,399          16,399          16,399  ..............  ..............
     NAVY SPACE AND ELECTRONIC WARFARE [SEW] SUPPORT                             4,579           4,579           4,579  ..............  ..............
     SEW SURVEILLANCE/RECONNAISSANCE SUPPORT                                     8,000           8,000           8,000  ..............  ..............
     MARINE CORPS PROGRAM WIDE SUPPORT                                          18,490          18,490          18,490  ..............  ..............
     TACTICAL CRYPTOLOGIC ACTIVITIES                                             2,795           2,795           2,795  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, RDT&E MANAGEMENT SUPPORT                                     845,077         875,077         856,077         +11,000         -19,000

     OPERATIONAL SYSTEMS DEVELOPMENT
     UNMANNED COMBAT AIR VEHICLE [UCAV] ADVANCED COMPONENT.                    142,282         142,282         142,282  ..............  ..............
     STRATEGIC SUB & WEAPONS SYSTEM SUPPORT                                    105,892         105,892         105,892  ..............  ..............
     SSBN SECURITY TECHNOLOGY PROGRAM                                           34,729          34,729          34,729  ..............  ..............
     SUBMARINE ACOUSTIC WARFARE DEVELOPMENT                                      1,434           1,434           1,434  ..............  ..............
     NAVY STRATEGIC COMMUNICATIONS                                              19,208          19,208          19,208  ..............  ..............
     RAPID TECHNOLOGY TRANSITION [RTT]                                          25,566          25,566          25,566  ..............  ..............
     F/A-18 SQUADRONS                                                          188,299         168,299         170,299         -18,000          +2,000
     E-2 SQUADRONS                                                               8,610           8,610           8,610  ..............  ..............
     FLEET TELECOMMUNICATIONS (TACTICAL)                                        15,695          15,695          15,695  ..............  ..............
     SURFACE SUPPORT                                                             4,171           4,171           3,371            -800            -800
     TOMAHAWK AND TOMAHAWK MISSION PLANNING CENTER [TMPC]                       11,265          11,265          11,265  ..............  ..............
     INTEGRATED SURVEILLANCE SYSTEM                                             45,922          45,922          45,922  ..............  ..............
     AMPHIBIOUS TACTICAL SUPPORT UNITS                                           8,435           8,435           8,435  ..............  ..............
     GROUND/AIR TASK ORIENTED RADAR                                             75,088          75,088          75,088  ..............  ..............
     CONSOLIDATED TRAINING SYSTEMS DEVELOPMENT                                  20,229          20,229          18,544          -1,685          -1,685
     CRYPTOLOGIC DIRECT SUPPORT                                                  1,756           1,756           1,756  ..............  ..............
     ELECTRONIC WARFARE [EW] READINESS SUPPORT                                  19,843          19,843          19,843  ..............  ..............
     HARM IMPROVEMENT                                                           11,477          11,477          11,477  ..............  ..............
     TACTICAL DATA LINKS                                                       118,818         118,818          90,618         -28,200         -28,200
     SURFACE ASW COMBAT SYSTEM INTEGRATION                                      27,342          27,342          27,342  ..............  ..............
     MK-48 ADCAP                                                                28,717          38,717          28,717  ..............         -10,000
     AVIATION IMPROVEMENTS                                                      89,157          89,157          89,157  ..............  ..............
     NAVY SCIENCE ASSISTANCE PROGRAM                                             3,450           3,450           3,450  ..............  ..............
     OPERATIONAL NUCLEAR POWER SYSTEMS                                          86,435          86,435          86,435  ..............  ..............
     MARINE CORPS COMMUNICATIONS SYSTEMS                                       219,054         219,054         206,054         -13,000         -13,000
     MARINE CORPS GROUND COMBAT/SUPPORTING ARMS SYSTEMS                        181,693         181,693         171,693         -10,000         -10,000
     MARINE CORPS COMBAT SERVICES SUPPORT                                       58,393          58,393          54,393          -4,000          -4,000
     USMC INTELLIGENCE/ELECTRONIC WARFARE SYSTEMS (MIP)                         22,966          22,966          22,966  ..............  ..............
     TACTICAL AIM MISSILES                                                      21,107          21,107          21,107  ..............  ..............
     ADVANCED MEDIUM RANGE AIR-TO-AIR MISSILE [AMRAAM]                           2,857           2,857           2,857  ..............  ..............
     JOINT HIGH SPEED VESSEL [JHSV]                                              1,932           1,932           1,932  ..............  ..............
     SATELLITE COMMUNICATIONS (SPACE)                                          188,482         188,482         188,482  ..............  ..............
     CONSOLIDATED AFLOAT NETWORK ENTERPRISE SERVICES                            16,749          16,749          16,749  ..............  ..............
     INFORMATION SYSTEMS SECURITY PROGRAM                                       26,307          26,307          26,307  ..............  ..............
     WWMCCS/Global Command and Control System                                      500             500             500  ..............  ..............
     COBRA JUDY                                                                 17,091          17,091          17,091  ..............  ..............
     NAVY METEOROLOGICAL AND OCEAN SENSORS-SPACE [METOC]                           810             810             810  ..............  ..............
     JOINT MILITARY INTELLIGENCE PROGRAMS                                        8,617           8,617           8,617  ..............  ..............
     TACTICAL UNMANNED AERIAL VEHICLES                                           9,066           9,066           7,566          -1,500          -1,500
     MANNED RECONNAISSANCE SYSTEMS                                              30,654          30,654          30,654  ..............  ..............
     DISTRIBUTED COMMON GROUND SYSTEMS/SURFACE SYSTEMS                          25,917          25,917          25,917  ..............  ..............
     DISTRIBUTED COMMON GROUND SYSTEMS/SURFACE SYSTEMS                          14,676          14,676          14,676  ..............  ..............
     RQ-4 UAV                                                                  657,483         657,483         657,483  ..............  ..............
     MQ-8 UAV                                                                   99,600          33,600          99,600  ..............         +66,000
     RQ-11 UAV                                                                     495             495             495  ..............  ..............
     RQ-7 UAV                                                                      863             863             863  ..............  ..............
     SMALL (LEVEL 0) TACTICAL UAS [STUASL0]                                      9,734           9,734           9,734  ..............  ..............
     RQ-21A                                                                     22,343          22,343          22,343  ..............  ..............
     MODELING AND SIMULATION SUPPORT                                             5,908           5,908           5,908  ..............  ..............
     DEPOT MAINTENANCE (NON-IF)                                                 27,391          27,391          27,391  ..............  ..............
     INDUSTRIAL PREPAREDNESS                                                    54,879          64,879          74,879         +20,000         +10,000
     MARITIME TECHNOLOGY (MARITECH)                                              5,000           5,000           5,000  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, OPERATIONAL SYSTEMS DEVELOPMENT                            2,824,387       2,758,387       2,767,202         -57,185          +8,815

     CLASSIFIED PROGRAMS                                                     1,151,159       1,351,159       1,136,159         -15,000        -215,000
                                                                       ---------------------------------------------------------------------------------
           TOTAL, RESEARCH, DEVELOPMENT, TEST & EVAL, NAVY                  16,882,877      16,987,768      16,646,307        -236,570        -341,461
--------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                                                    Change from
Line                             Item                               2013 budget      Committee        budget
                                                                     estimate     recommendation     estimate
----------------------------------------------------------------------------------------------------------------
   3 Defense Research Sciences                                         473,070         483,070         +10,000
         Nanotechnology Research                                ..............  ..............         +10,000
   4 Power Projection Applied Research                                  89,189          99,189         +10,000
         Power Projection Applied Research--program increase    ..............  ..............         +10,000
   5 Force Protection Applied Research                                 143,301         213,301         +70,000
         Alternative energy research                            ..............  ..............         +40,000
         Materials research and technology                      ..............  ..............         +15,000
         Power generation and storage research                  ..............  ..............         +15,000
  19 Electromagnetic Systems Advanced Technology                        54,858          64,858         +10,000
         Advanced radar research                                ..............  ..............         +10,000
  22 Future Naval Capabilities Advanced Technology Development         256,382         293,382         +37,000
         Technology Transition--restore unjustified reduction   ..............  ..............         +37,000
  35 Surface and Shallow Water Mine Countermeasures                    190,622         188,622          -2,000
         Excess to need                                         ..............  ..............          -2,000
  44 Advanced Submarine System Development                             555,123          77,028        -478,095
         Transfer to RDN Line 44X Ohio class replacement        ..............  ..............        -483,095
          program
         Seawolf risk reduction efforts                         ..............  ..............          +5,000
 44X Ohio class replacement program                             ..............         483,095        +483,095
         Transfer from RDN Line 44 Advanced Submarine System    ..............  ..............        +483,095
          Development
  47 Ship Preliminary Design and Feasibility Studies                    13,710          43,710         +30,000
         TAO(X) Design                                          ..............  ..............         +30,000
  50 CHALK EAGLE                                                       509,988         499,988         -10,000
         Unjustified cost growth                                ..............  ..............         -10,000
  51 Littoral Combat Ship [LCS]                                        429,420         416,920         -12,500
         Reduction to Training architecture                     ..............  ..............         -12,500
  52 Combat System Integration                                          56,551          50,551          -6,000
         Program behind in execution                            ..............  ..............          -6,000
  54 Marine Corps Assault Vehicles                                      95,182          83,182         -12,000
         Program behind in execution                            ..............  ..............         -12,000
  66 RETRACT ELM                                                       174,014         162,014         -12,000
         Program behind in execution                            ..............  ..............         -12,000
  73 Joint Precision Approach and Landing Systems--Dem/Val             137,369         135,454          -1,915
         Program Management cost growth                         ..............  ..............          -1,915
  78 Joint Counter Radio Controlled IED Electronic Warfare              71,300          51,426         -19,874
      [JCREW]
         Unjustified miscellaneous contract                     ..............  ..............          -4,364
         Program Execution                                      ..............  ..............         -15,510
  80 Space and Electronic Warfare [SEW] Architecture/                   31,549          28,949          -2,600
      Engineering Support
         Program behind in execution                            ..............  ..............          -2,600
  83 Joint Light Tactical Vehicle [JLTV] Engineering and                44,500          38,591          -5,909
      Manufacturing Development Ph
         Contract award delay                                   ..............  ..............          -5,909
  88 AV-8B Aircraft--Eng Dev                                            32,789          17,535         -15,254
         Excess functional control computer funding             ..............  ..............         -15,254
  89 Standards Development                                              84,988          76,988          -8,000
         Program behind in execution                            ..............  ..............          -8,000
  93 Warfare Support System                                             13,071          11,071          -2,000
         Program behind in execution                            ..............  ..............          -2,000
  95 Advanced Hawkeye                                                  119,065         129,065         +10,000
         Advanced radar research                                ..............  ..............         +10,000
 103 Next Generation Jammer [NGJ]                                      187,024         167,024         -20,000
         Milestone delay                                        ..............  ..............         -20,000
 108 Standard Missile Improvements                                      63,891          43,891         -20,000
         Modernization program delay due to development issues  ..............  ..............         -20,000
 109 Airborne MCM                                                       73,246          66,996          -6,250
         Program not meeting key performance parameters         ..............  ..............          -3,000
         Overall program behind in execution                    ..............  ..............          -3,250
 112 Unmanned Carrier Launched Airborne Surveillance and               122,481         102,481         -20,000
      Strike [UCLASS] System
         Milestone A slipped--program behind schedule           ..............  ..............         -20,000
 113 Advanced Above Water Sensors                                      255,516          41,895        -213,621
         Transfer to RDN Line 113X Air and Missile Defense      ..............  ..............        -223,621
          Radar
         Advanced radar research                                ..............  ..............         +10,000
113X Air and Missile Defense Radar                              ..............         223,621        +223,621
         Transfer from RDN Line 113 Advanced Above Water        ..............  ..............        +223,621
          Sensors
 118 New Design SSN                                                    165,230          75,230         -90,000
         Virginia Payload early to need                         ..............  ..............         -90,000
 123 Lightweight Torpedo Development                                    49,818          36,452         -13,366
         Program forward financed                               ..............  ..............         -13,366
 124 Joint Service Explosive Ordnance Development                       10,099           8,099          -2,000
         Program behind in execution                            ..............  ..............          -2,000
 125 Personnel, Training, Simulation, and Human Factors                  7,348           5,348          -2,000
         Program behind in execution                            ..............  ..............          -2,000
 129 Ship Self Defense (Engage: Soft Kill/EW)                          151,489         139,489         -12,000
         Program behind in execution                            ..............  ..............         -12,000
 132 Navigation/ID System                                               47,764          41,764          -6,000
         Program behind in execution                            ..............  ..............          -6,000
 133 Joint Strike Fighter [JSF]--EMD                                   737,149         722,149         -15,000
         Development Support excess to need                     ..............  ..............         -15,000
 134 Joint Strike Fighter [JSF]--EMD                                   743,926         720,209         -23,717
         Block IV development ahead of need                     ..............  ..............          -8,717
         Development Support excess to need                     ..............  ..............         -15,000
 140 Multi-Mission Maritime Aircraft [MMA]                             421,102         394,102         -27,000
         Spiral 1 award development delay                       ..............  ..............         -20,000
         Spiral 2 award development delay                       ..............  ..............          -7,000
 149 Joint Theater Air and Missile Defense Organization                  7,573           6,573          -1,000
         Program behind in execution                            ..............  ..............          -1,000
 150 Studies and Analysis Support--Navy                                 20,963          17,963          -3,000
         Program behind in execution                            ..............  ..............          -3,000
 154 Management, Technical and International Support                    32,782          47,782         +15,000
         Printed Circuit Board Executive Agent--Funds Previous  ..............  ..............         +15,000
          NDAA mandate
 175 F/A-18 Squadrons                                                  188,299         170,299         -18,000
         Program behind in execution                            ..............  ..............         -18,000
 178 Surface Support                                                     4,171           3,371            -800
         Program behind in execution                            ..............  ..............            -800
 183 Consolidated Training Systems Development                          20,229          18,544          -1,685
         Program behind in execution                            ..............  ..............          -1,685
 187 Tactical Data Links                                               118,818          90,618         -28,200
         Program behind in execution                            ..............  ..............         -28,200
 193 Marine Corps Communications Systems                               219,054         206,054         -13,000
         Common aviation command and control system late        ..............  ..............          -9,000
          contract award
         Marine personnel carrier--excess program management    ..............  ..............          -4,000
 194 Marine Corps Ground Combat/Supporting Arms Systems                181,693         171,693         -10,000
         Program behind in execution                            ..............  ..............         -10,000
 195 Marine Corps Combat Services Support                               58,393          54,393          -4,000
         Program behind in execution                            ..............  ..............          -4,000
 213 Tactical Unmanned Aerial Vehicles                                   9,066           7,566          -1,500
         Contract award delay                                   ..............  ..............          -1,500
 229 Industrial Preparedness                                            54,879          74,879         +20,000
         Industrial preparedness                                ..............  ..............         +20,000
 999 Classified Programs                                             1,151,159       1,136,159         -15,000
         Classified adjustment                                  ..............  ..............         -15,000
----------------------------------------------------------------------------------------------------------------

    Ocean Renewable Energy.--The Committee commends the Navy's 
efforts to support ocean renewable energy testing, research, 
development, and deployment for maritime security systems, 
support at-sea surveillance and communications systems, and 
further opportunities to reduce the cost of energy and increase 
energy security at coastal Department of Defense facilities. 
The Committee encourages the Navy to continue its investments 
in developing ocean renewable energy technologies and to 
coordinate with the Department of Energy and designated 
National Marine Renewable Energy Centers for ocean renewable 
energy demonstration activities at or near Department of 
Defense facilities. The Committee understands the Navy's goal 
is to produce 50 percent of its shore-based energy requirements 
from alternative sources by 2020 and notes that deepwater 
offshore wind and other renewable energy sources could offer 
advantages as an electricity source for Navy facilities. Not 
later than 90 days after enactment of this act, the Department 
shall provide a briefing to the congressional defense 
committees on current and future programs related to ocean 
renewable energy research and development activities and 
provide an analysis of the locations within the United States 
that such activities would be viable.
    Automated Test and Re-Test.--The Navy's automated test and 
re-test [ATRT] program was initiated to focus on reducing test 
time, fielding higher-quality software and promoting the re-use 
of tests and software. The Committee is aware that application 
of ATRT has dramatically reduced system and subsystem test 
execution times and costs while conducting more thorough 
testing. Recognizing these benefits, the Navy's Program 
Executive Officer for Integrated Warfare Systems 1.0 directed 
each agency under his purview to integrate ATRT into their 
processes and standard operation procedures. These cost 
reductions and efficiencies should be implemented Navy-wide and 
the Committee expects to see the billions of dollars of savings 
reflected in the Department's fiscal year 2014 budget 
submission and the future years defense program.
    Next Generation Jammer [NGJ] Development.--The fiscal year 
2013 request includes $187,024,000 for Research, Development, 
Test and Evaluation for the Navy NGJ program. Due to a delay in 
the technology development phase that was scheduled for fiscal 
year 2012 but has now moved to late fiscal year 2013, the 
Committee recommends a reduction of $20,000,000. In addition, 
the Committee directs the Government Accountability Office to 
conduct a review of the program by May 2013 to determine if 
there are redundancies across the services and assess whether 
this effort should become a joint service solution.
    New Design Submarine Development.--The fiscal year 2013 
request includes $165,230,000 for Research, Development, Test 
and Evaluation for the Navy's New Design Submarine program. 
Included in the request is $99,868,000 to begin development of 
a new Virginia-class Payload Module [VPM]. The Committee is 
concerned that increasing the Virginia-class submarine size by 
one-third to accommodate a 93.7-foot module in the submarine's 
center will result in instability to proven submarine design, 
disruption to a stable production line, and add significant 
cost risk. Preliminary cost estimates indicate development 
alone will be $800,000,000. The Committee is also concerned 
with the lack of defined requirements and cost estimate for an 
Acquisition Category [ACAT] I Major Defense Acquisition 
Programs [MDAPs] modification. For example, it is not yet clear 
what payloads would be carried, how many VPM's are required, 
and how the VPM may alter the Virginia-class concept of 
operations. In addition, VPM will not go on contract until late 
fiscal year 2013. For these reasons, the Committee finds it is 
premature to invest nearly $100,000,000 into this new program 
and recommends a reduction of $90,000,000 to the request. The 
Committee directs the remaining funds to be used to validate 
the VPM requirement and cost estimate with the Joint 
Requirement Oversight Council, to ensure the VPM program is 
subject to the capability and acquisition rigor, typical of an 
ACAT I MDAP.
    Ship Contract Design/Live Fire Test and Evaluation.--The 
fiscal year 2013 request includes $196,737,000 for Research, 
Development, Test and Evaluation for Ship Contract Design/Live 
Fire Test and Evaluation. This program is experiencing delays 
in the development phase related to the Ship to Shore connector 
and is carrying large unobligated balances forward from fiscal 
year 2012 to fiscal year 2013. Therefore, the Committee 
encourages the Navy to apply these unobligated balances toward 
the alternative shock test program to bridge the alternative 
shock test program's fiscal year 2013 funding gap. The 
Committee understands that the alternative shock trial testing 
is safer for the environment, more cost and time effective, and 
leverages commercial off-the-shelf technology.
    Multimission Maritime Aircraft [MMA] Development 
Concurrency.--The fiscal year 2013 request includes 
$421,102,000 for Research, Development, Test and Evaluation for 
the Navy MMA program. The MMA program is currently in the 
development phase scheduled to complete late fiscal year 2013. 
The Committee is concerned with concurrency in development 
since, in addition to the baseline development, the program is 
requesting to begin spiral one and spiral two post development 
programs. Therefore, the Committee recommends a reduction of 
$27,000,000 to this program, and directs the Secretary of the 
Navy to create a Joint Requirement Oversight Council approved 
modernization roadmap to validate the additional capabilities 
required for MMA.
    Industrial Preparedness.--The fiscal year 2013 budget 
request proposes $54,879,000 for the Navy's Industrial 
Preparedness effort. This program funds the development of 
manufacturing technologies intended to improve the productivity 
and responsiveness of the U.S. defense industrial base. The 
Committee recommends an additional $20,000,000 above the 
request to accelerate shipbuilding affordability initiatives 
and expects the Navy to allocate overall program shipbuilding 
affordability funding proportionally to the following major 
shipbuilding categories: aircraft carriers, large surface 
combatants, small surface combatants, attack submarines, and 
amphibious warfare ships.

         Research, Development, Test and Evaluation, Air Force

Appropriations, 2012.................................... $26,535,996,000
Budget estimate, 2013...................................  25,428,046,000
House allowance.........................................  25,117,692,000
Committee recommendation................................  25,374,286,000

    The Committee recommends an appropriation of 
$25,374,286,000. This is $53,760,000 below the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                [In thousands of dollars]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2013 budget        House         Committee   -------------------------------
                                         Item                                estimate        allowance    recommendation      Budget           House
                                                                                                                             estimate        allowance
--------------------------------------------------------------------------------------------------------------------------------------------------------
               RESEARCH, DEVELOPMENT, TEST & EVAL, AIR FORCE

     BASIC RESEARCH
     DEFENSE RESEARCH SCIENCES                                                 361,787         361,787         361,787  ..............  ..............
     UNIVERSITY RESEARCH INITIATIVES                                           141,153         141,153         141,153  ..............  ..............
     HIGH ENERGY LASER RESEARCH INITIATIVES                                     13,094          13,094          13,094  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BASIC RESEARCH                                               516,034         516,034         516,034  ..............  ..............

     APPLIED RESEARCH
     MATERIALS                                                                 114,166         114,166         124,166         +10,000         +10,000
     AEROSPACE VEHICLE TECHNOLOGIES                                            120,719         120,719         120,719  ..............  ..............
     HUMAN EFFECTIVENESS APPLIED RESEARCH                                       89,319          89,319          89,319  ..............  ..............
     AEROSPACE PROPULSION                                                      232,547         232,547         232,547  ..............  ..............
     AEROSPACE SENSORS                                                         127,637         127,637         127,637  ..............  ..............
     SPACE TECHNOLOGY                                                           98,375          98,375          98,375  ..............  ..............
     CONVENTIONAL MUNITIONS                                                     77,175          77,175          77,175  ..............  ..............
     DIRECTED ENERGY TECHNOLOGY                                                106,196         106,196          85,317         -20,879         -20,879
     DOMINANT INFORMATION SCIENCES AND METHODS                                 104,362         104,362         104,362  ..............  ..............
     HIGH ENERGY LASER RESEARCH                                                 38,557          38,557          38,557  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, APPLIED RESEARCH                                           1,109,053       1,109,053       1,098,174         -10,879         -10,879

     ADVANCED TECHNOLOGY DEVELOPMENT
     ADVANCED MATERIALS FOR WEAPON SYSTEMS                                      47,890          47,890          62,890         +15,000         +15,000
     SUSTAINMENT SCIENCE AND TECHNOLOGY [S&T]                                    6,565           6,565           6,565  ..............  ..............
     ADVANCED AEROSPACE SENSORS                                                 37,657          37,657          37,657  ..............  ..............
     AEROSPACE TECHNOLOGY DEV/DEMO                                              81,376          81,376          81,376  ..............  ..............
     AEROSPACE PROPULSION AND POWER TECHNOLOGY                                 151,152         151,152         166,152         +15,000         +15,000
     ELECTRONIC COMBAT TECHNOLOGY                                               32,941          32,941          26,941          -6,000          -6,000
     ADVANCED SPACECRAFT TECHNOLOGY                                             64,557          64,557          64,557  ..............  ..............
     MAUI SPACE SURVEILLANCE SYSTEM (MSSS)                                      29,256          29,256          29,256  ..............  ..............
     HUMAN EFFECTIVENESS ADVANCED TECHNOLOGY DEVELOPMENT                        21,523          21,523          21,523  ..............  ..............
     CONVENTIONAL WEAPONS TECHNOLOGY                                            36,352          36,352          36,352  ..............  ..............
     ADVANCED WEAPONS TECHNOLOGY                                                19,004          19,004          19,004  ..............  ..............
     MANUFACTURING TECHNOLOGY PROGRAM                                           37,045          57,045          37,045  ..............         -20,000
     BATTLESPACE KNOWLEDGE DEVELOPMENT & DEMONSTRATION                          31,419          31,419          31,419  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, ADVANCED TECHNOLOGY DEVELOPMENT                              596,737         616,737         620,737         +24,000          +4,000

     ADVANCED COMPONENT DEVELOPMENT
     INTELLIGENCE ADVANCED DEVELOPMENT                                           3,866           3,866           3,866  ..............  ..............
     PHYSICAL SECURITY EQUIPMENT                                                 3,704           3,704           3,704  ..............  ..............
     ADVANCED EHF MILSATCOM (SPACE)                                            229,171         199,171         257,671         +28,500         +58,500
     POLAR MILSATCOM (SPACE)                                                   120,676         120,676         120,676  ..............  ..............
     SPACE CONTROL TECHNOLOGY                                                   25,144          25,144          23,144          -2,000          -2,000
     COMBAT IDENTIFICATION TECHNOLOGY                                           32,243          29,243          32,243  ..............          +3,000
     NATO RESEARCH AND DEVELOPMENT                                               4,507           4,507           4,507  ..............  ..............
     INTERNATIONAL SPACE COOPERATIVE R&D                                           652             652             652  ..............  ..............
     SPACE PROTECTION PROGRAM [SPP]                                             10,429          10,429          10,429  ..............  ..............
     INTEGRATED BROADCAST SERVICE                                               19,938          19,938          19,938  ..............  ..............
     INTERCONTINENTAL BALLISTIC MISSILE                                         71,181          71,181          71,181  ..............  ..............
     WIDEBAND GAPFILLER SYSTEM RDT&E (SPACE)                                    12,027          12,027          12,027  ..............  ..............
     POLLUTION PREVENTION (DEM/VAL)                                              2,054           2,054           1,054          -1,000          -1,000
     JOINT PRECISION APPROACH AND LANDING SYSTEMS                               57,975          57,975          12,975         -45,000         -45,000
     LONG RANGE STRIKE                                                         291,742         291,742         291,742  ..............  ..............
     BATTLE MGMT COM & CTRL SENSOR DEVELOPMENT                                 114,417         124,417         101,417         -13,000         -23,000
     TECHNOLOGY TRANSFER                                                         2,576           2,576           2,576  ..............  ..............
     HARD AND DEEPLY BURIED TARGET DEFEAT SYSTEM                                16,711          16,711          16,711  ..............  ..............
     REQUIREMENTS ANALYSIS AND MATURATION                                       16,343          16,343          16,343  ..............  ..............
     WEATHER SATELLITE FOLLOW-ON                                                 2,000           2,000  ..............          -2,000          -2,000
     GROUND ATTACK WEAPONS FUZE DEVELOPMENT                                      9,423           9,423           9,423  ..............  ..............
     OPERATIONALLY RESPONSIVE SPACE                                     ..............  ..............         110,000        +110,000        +110,000
     TECH TRANSITION PROGRAM                                                    37,558           3,058          34,558          -3,000         +31,500
     NAVSTAR GLOBAL POSITIONING SYSTEM (USER EQUIPMENT)                         96,840          86,840          76,840         -20,000         -10,000
                                                                       ---------------------------------------------------------------------------------
           TOTAL, ADVANCED COMPONENT DEVELOPMENT                             1,181,177       1,113,677       1,233,677         +52,500        +120,000

     ENGINEERING & MANUFACTURING DEVELOPMENT
     GLOBAL BROADCAST SERVICE [GBS]                                             14,652          14,652          14,652  ..............  ..............
     NUCLEAR WEAPONS SUPPORT                                                    25,713          25,713  ..............         -25,713         -25,713
     SPECIALIZED UNDERGRADUATE FLIGHT TRAINING                                   6,583           1,583           1,983          -4,600            +400
     ELECTRONIC WARFARE DEVELOPMENT                                              1,975           1,975           1,975  ..............  ..............
     JOINT TACTICAL RADIO                                                        2,594           2,594  ..............          -2,594          -2,594
     TACTICAL DATA NETWORKS ENTERPRISE                                          24,534          24,534          24,534  ..............  ..............
     PHYSICAL SECURITY EQUIPMENT                                                    51              51              51  ..............  ..............
     SMALL DIAMETER BOMB [SDB]                                                 143,000         143,000         138,000          -5,000          -5,000
     COUNTERSPACE SYSTEMS                                                       28,797          28,797          27,797          -1,000          -1,000
     SPACE SITUATION AWARENESS SYSTEMS                                         267,252         230,152         267,252  ..............         +37,100
     AIRBORNE ELECTRONIC ATTACK                                                  4,118           4,118           4,118  ..............  ..............
     SPACE BASED INFRARED SYSTEM [SBIRS] HIGH EMD                              448,594         516,594         466,594         +18,000         -50,000
     ARMAMENT/ORDNANCE DEVELOPMENT                                               9,951           9,951           9,951  ..............  ..............
     SUBMUNITIONS                                                                2,567           2,567           2,567  ..............  ..............
     AGILE COMBAT SUPPORT                                                       13,059          13,059          28,059         +15,000         +15,000
     LIFE SUPPORT SYSTEMS                                                        9,720           9,720           6,720          -3,000          -3,000
     COMBAT TRAINING RANGES                                                      9,222           9,222           9,222  ..............  ..............
     INTELLIGENCE EQUIPMENT                                                        803             803             803  ..............  ..............
     JOINT STRIKE FIGHTER [JSF]                                              1,210,306       1,207,999       1,169,589         -40,717         -38,410
     INTERCONTINENTAL BALLISTIC MISSILE                                        135,437         135,437         135,437  ..............  ..............
     EVOLVED EXPENDABLE LAUNCH VEHICLE PROGRAM (SPACE)                           7,980          32,980           7,980  ..............         -25,000
     LONG RANGE STANDOFF WEAPON                                                  2,004           2,004           2,004  ..............  ..............
     ICBM FUZE MODERNIZATION                                                    73,512          73,512          73,512  ..............  ..............
     F-22 MODERNIZATION INCREMENT 3.2B                                         140,100         140,100         140,100  ..............  ..............
     NEXT GENERATION AERIAL REFUELING AIRCRAFT                               1,815,588       1,815,588       1,738,488         -77,100         -77,100
     CSAR HH-60 RECAPITALIZATION                                               123,210         123,210         115,210          -8,000          -8,000
     HC/MC-130 RECAP RDT&E                                                      19,039          19,039          10,739          -8,300          -8,300
     B-2 DEFENSIVE MANAGEMENT SYSTEM                                           281,056         281,056         248,056         -33,000         -33,000
     NUCLEAR WEAPONS MODERNIZATION                                              80,200          80,200          80,200  ..............  ..............
     READINESS TRAINING RANGES, OPERATIONS AND MAINTENANCE                         310             310             310  ..............  ..............
     FULL COMBAT MISSION TRAINING                                               14,861          14,861          14,861  ..............  ..............
     MC-12                                                                      19,949          19,949          19,949  ..............  ..............
     JOINT CARGO AIRCRAFT [JCA]                                         ..............          25,000           6,500          +6,500         -18,500
     CV-22                                                                      28,027          28,027          28,027  ..............  ..............
     AIRBORNE SENIOR LEADER C3 [SLC3S]                                           1,960           1,960           1,960  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, ENGINEERING & MANUFACTURING DEVELOPMENT                    4,966,724       5,040,317       4,797,200        -169,524        -243,117

     RDT&E MANAGEMENT SUPPORT
     THREAT SIMULATOR DEVELOPMENT                                               22,812          22,812          22,812  ..............  ..............
     MAJOR T&E INVESTMENT                                                       42,236          42,236          42,236  ..............  ..............
     RAND PROJECT AIR FORCE                                                     25,579          25,579          25,579  ..............  ..............
     INITIAL OPERATIONAL TEST & EVALUATION                                      16,197          16,197          16,197  ..............  ..............
     TEST AND EVALUATION SUPPORT                                               722,071         722,071         722,071  ..............  ..............
     ROCKET SYSTEMS LAUNCH PROGRAM (SPACE)                                      16,200          16,200          16,200  ..............  ..............
     SPACE TEST PROGRAM [STP]                                                   10,051          10,051          45,051         +35,000         +35,000
     FACILITIES RESTORATION & MODERNIZATION--TEST & EVAL                        42,597          42,597          42,597  ..............  ..............
     FACILITIES SUSTAINMENT--TEST AND EVALUATION SUPPORT                        27,301          27,301          27,301  ..............  ..............
     MULTI-SERVICE SYSTEMS ENGINEERING INITIATIVE                               13,964          13,964          13,964  ..............  ..............
     SPACE AND MISSILE CENTER [SMC] CIVILIAN WORKFORCE                         203,766         203,766         195,766          -8,000          -8,000
     ACQUISITION AND MANAGEMENT SUPPORT                                         42,430          42,430          32,530          -9,900          -9,900
     GENERAL SKILL TRAINING                                                      1,294           1,294  ..............          -1,294          -1,294
     INTERNATIONAL ACTIVITIES                                                    3,851           3,851           3,851  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, RDT&E MANAGEMENT SUPPORT                                   1,190,349       1,190,349       1,206,155         +15,806         +15,806

     OPERATIONAL SYSTEMS DEVELOPMENT
     GPS III--OPERATIONAL CONTROL SEGMENT                                      371,595         333,295         370,095          -1,500         +36,800
     AIR FORCE INTEGRATED MILITARY HUMAN RESOURCES SYSTEM                       91,697          91,697          45,697         -46,000         -46,000
     ANTI-TAMPER TECHNOLOGY EXECUTIVE AGENCY                                    17,037          37,037          17,037  ..............         -20,000
     B-52 SQUADRONS                                                             53,208          18,508          53,208  ..............         +34,700
     AIR-LAUNCHED CRUISE MISSILE [ALCM]                                            431             431             431  ..............  ..............
     B-1B SQUADRONS                                                             16,265          16,265          16,265  ..............  ..............
     B-2 SQUADRONS                                                              35,970          35,970          35,970  ..............  ..............
     STRAT WAR PLANNING SYSTEM--USSTRATCOM                                      30,889          30,889          23,189          -7,700          -7,700
     NIGHT FIST--USSTRATCOM                                                         10              10  ..............             -10             -10
     REGION/SECTOR OPERATION CONTROL CENTER MODERNIZATION                        5,609           5,609           5,609  ..............  ..............
     WARFIGHTER RAPID ACQUISITION PROCESS [WRAP] RAPID TRAN                     15,098          15,098           5,098         -10,000         -10,000
     MQ-9 UAV                                                                  147,971         147,971         135,171         -12,800         -12,800
     MULTI-PLATFORM ELECTRONIC WARFARE EQUIPMENT                                49,848          34,848          49,848  ..............         +15,000
     A-10 SQUADRONS                                                             13,538          13,538          11,538          -2,000          -2,000
     F-16 SQUADRONS                                                            190,257         190,257         176,757         -13,500         -13,500
     F-15E SQUADRONS                                                           192,677         192,677         171,677         -21,000         -21,000
     MANNED DESTRUCTIVE SUPPRESSION                                             13,683          13,683          13,683  ..............  ..............
     F-22 SQUADRONS                                                            371,667         371,667         342,667         -29,000         -29,000
     F-35 SQUADRONS                                                              8,117  ..............           8,117  ..............          +8,117
     TACTICAL AIM MISSILES                                                       8,234           8,234           6,634          -1,600          -1,600
     ADVANCED MEDIUM RANGE AIR-TO-AIR MISSILE [AMRAAM]                          87,041          87,041          77,041         -10,000         -10,000
     JOINT HELMET MOUNTED CUEING SYSTEM [JHMCS]                                  1,472           1,472           1,472  ..............  ..............
     COMBAT RESCUE AND RECOVERY                                                  2,095           2,095           2,095  ..............  ..............
     COMBAT RESCUE--PARARESCUE                                                   1,119           1,119           1,119  ..............  ..............
     AF TENCAP                                                                  63,853          63,853          63,853  ..............  ..............
     PRECISION ATTACK SYSTEMS PROCUREMENT                                        1,063           1,063           1,063  ..............  ..............
     COMPASS CALL                                                               12,094          12,094          12,094  ..............  ..............
     AIRCRAFT ENGINE COMPONENT IMPROVEMENT PROGRAM                             187,984         187,984         187,984  ..............  ..............
     JOINT AIR-TO-SURFACE STANDOFF MISSILE [JASSM]                               7,950           7,950           7,950  ..............  ..............
     AIR AND SPACE OPERATIONS CENTER [AOC]                                      76,315          76,315          76,315  ..............  ..............
     CONTROL AND REPORTING CENTER [CRC]                                          8,653           8,653           8,653  ..............  ..............
     AIRBORNE WARNING AND CONTROL SYSTEM [AWACS]                                65,200          48,900          65,200  ..............         +16,300
     TACTICAL AIRBORNE CONTROL SYSTEMS                                           5,767           5,767           5,767  ..............  ..............
     COMBAT AIR INTELLIGENCE SYSTEM ACTIVITIES                                   5,756           5,756           5,756  ..............  ..............
     TACTICAL AIR CONTROL PARTY--MOD                                            16,226          16,226          16,226  ..............  ..............
     C2ISR TACTICAL DATA LINK                                                    1,633           1,633           1,633  ..............  ..............
     COMMAND AND CONTROL [C2] CONSTELLATION                                     18,086          18,086          15,786          -2,300          -2,300
     DCAPES                                                                     15,690          15,690          15,690  ..............  ..............
     JOINT SURVEILLANCE AND TARGET ATTACK RADAR SYSTEM                          24,241          24,241          24,241  ..............  ..............
     SEEK EAGLE                                                                 22,654          22,654          22,654  ..............  ..............
     USAF MODELING AND SIMULATION                                               15,501          15,501          15,501  ..............  ..............
     WARGAMING AND SIMULATION CENTERS                                            5,699           5,699           5,699  ..............  ..............
     DISTRIBUTED TRAINING AND EXERCISES                                          4,425           4,425           3,225          -1,200          -1,200
     MISSION PLANNING SYSTEMS                                                   69,377          69,377          69,377  ..............  ..............
     INFORMATION WARFARE SUPPORT                                                 7,159           7,159           7,159  ..............  ..............
     CYBER COMMAND ACTIVITIES                                                   66,888          66,888          66,888  ..............  ..............
     SPACE SUPERIORITY INTELLIGENCE                                             12,056          12,056          12,056  ..............  ..............
     E-4B NATIONAL AIRBORNE OPERATIONS CENTER [NAOC]                             4,159           4,159           4,159  ..............  ..............
     MINIMUM ESSENTIAL EMERGENCY COMMUNICATIONS NETWORK                         20,124          20,124          20,124  ..............  ..............
     INFORMATION SYSTEMS SECURITY PROGRAM                                       69,133          69,133          69,133  ..............  ..............
     GLOBAL COMBAT SUPPORT SYSTEM                                                6,512           6,512           3,512          -3,000          -3,000
     GLOBAL COMMAND AND CONTROL SYSTEM                                           4,316           2,316           2,316          -2,000  ..............
     MILSATCOM TERMINALS                                                       107,237         107,237         107,237  ..............  ..............
     AIRBORNE SIGINT ENTERPRISE                                                129,106         129,106         109,106         -20,000         -20,000
     GLOBAL AIR TRAFFIC MANAGEMENT [GATM]                                        4,461           4,461           4,461  ..............  ..............
     CYBER SECURITY INITIATIVE                                                   2,055           2,055           2,055  ..............  ..............
     DOD CYBER CRIME CENTER                                                        285             285             285  ..............  ..............
     SATELLITE CONTROL NETWORK (SPACE)                                          33,773          33,773          33,773  ..............  ..............
     WEATHER SERVICE                                                            29,048          29,048          29,048  ..............  ..............
     AIR TRAFFIC CONTROL, APPROACH, & LANDING SYSTEM [ATC]                      43,187          43,187          39,687          -3,500          -3,500
     AERIAL TARGETS                                                             50,496          50,496          46,096          -4,400          -4,400
     SECURITY AND INVESTIGATIVE ACTIVITIES                                         354             354             354  ..............  ..............
     ARMS CONTROL IMPLEMENTATION                                                 4,000           4,000           4,000  ..............  ..............
     DEFENSE JOINT COUNTERINTELLIGENCE ACTIVITIES                                  342             342  ..............            -342            -342
     NAVSTAR GLOBAL POSITIONING SYSTEM (USER EQUIPMENT)                         29,621          29,621          29,621  ..............  ..............
     NAVSTAR GLOBAL POSITIONING SYSTEM (SPACE AND CONTROL)                      14,335          14,335          14,335  ..............  ..............
     SPACE AND MISSILE TEST AND EVALUATION CENTER                                3,680           3,680           3,680  ..............  ..............
     SPACE WARFARE CENTER                                                        2,430           2,430           2,430  ..............  ..............
     SPACELIFT RANGE SYSTEM (SPACE)                                              8,760           8,760           8,360            -400            -400
     DRAGON U-2                                                                 23,644          23,644          23,644  ..............  ..............
     ENDURANCE UNMANNED AERIAL VEHICLES                                         21,000          31,000          79,000         +58,000         +48,000
     AIRBORNE RECONNAISSANCE SYSTEMS                                            96,735          96,735          76,735         -20,000         -20,000
     MANNED RECONNAISSANCE SYSTEMS                                              13,316          13,316          13,316  ..............  ..............
     DISTRIBUTED COMMON GROUND/SURFACE SYSTEMS                                  63,501          63,501          48,501         -15,000         -15,000
     PREDATOR UAV (JMIP)                                                         9,122           9,122           9,122  ..............  ..............
     RQ-4 UAV                                                                  236,265         252,265         236,265  ..............         -16,000
     NETWORK-CENTRIC COLLABORATIVE TARGET (TIARA)                                7,367           7,367           7,367  ..............  ..............
     COMMON DATA LINK [CDL]                                                     38,094          38,094          36,694          -1,400          -1,400
     NATO AGS                                                                  210,109         210,109         210,109  ..............  ..............
     SUPPORT TO DCGS ENTERPRISE                                                 24,500          24,500          24,500  ..............  ..............
     GPS III SPACE SEGMENT                                                     318,992         318,992         318,992  ..............  ..............
     JSPOC MISSION SYSTEM                                                       54,645          54,645          53,045          -1,600          -1,600
     RAPID CYBER ACQUISITION                                                     4,007           4,007           2,007          -2,000          -2,000
     INTELLIGENCE SUPPORT TO INFORMATION WARFARE                                13,357          13,357          13,357  ..............  ..............
     NUDET DETECTION SYSTEM (SPACE)                                             64,965          36,565          63,365          -1,600         +26,800
     SPACE SITUATION AWARENESS OPERATIONS                                       19,586          19,586          19,586  ..............  ..............
     SHARED EARLY WARNING [SEW]                                                  1,175           1,175           1,175  ..............  ..............
     C-130 AIRLIFT SQUADRON                                                      5,000          10,000           5,000  ..............          -5,000
     C-5 AIRLIFT SQUADRONS                                                      35,115          35,115          35,115  ..............  ..............
     C-17 AIRCRAFT                                                              99,225          99,225          86,225         -13,000         -13,000
     C-130J PROGRAM                                                             30,652          25,652          20,652         -10,000          -5,000
     LARGE AIRCRAFT IR COUNTERMEASURES [LAIRCM]                                  7,758           7,758           7,758  ..............  ..............
     LIGHT MOBILITY AIRCRAFT [LiMA]                                                100  ..............  ..............            -100  ..............
     KC-10S                                                                     24,022          24,022          17,022          -7,000          -7,000
     OPERATIONAL SUPPORT AIRLIFT                                                 7,471           7,471          18,571         +11,100         +11,100
     SPECIAL TACTICS/COMBAT CONTROL                                              4,984           4,984           4,984  ..............  ..............
     DEPOT MAINTENANCE (NON-IF)                                                  1,588           1,588           1,588  ..............  ..............
     LOGISTICS SUPPORT ACTIVITIES                                                  577             577             577  ..............  ..............
     LOGISTICS INFORMATION TECHNOLOGY [LOGIT]                                  119,327          99,327          77,327         -42,000         -22,000
     SUPPORT SYSTEMS DEVELOPMENT                                                15,873          15,873          55,873         +40,000         +40,000
     OTHER FLIGHT TRAINING                                                         349             349             349  ..............  ..............
     OTHER PERSONNEL ACTIVITIES                                                    117             117  ..............            -117            -117
     JOINT PERSONNEL RECOVERY AGENCY                                             2,018           2,018           2,018  ..............  ..............
     CIVILIAN COMPENSATION PROGRAM                                               1,561           1,561           1,561  ..............  ..............
     PERSONNEL ADMINISTRATION                                                    7,634           2,634           7,634  ..............          +5,000
     AIR FORCE STUDIES AND ANALYSIS AGENCY                                       1,175           1,175             675            -500            -500
     FACILITIES OPERATION--ADMINISTRATION                                        3,491           3,491           3,491  ..............  ..............
     FINANCIAL MANAGEMENT INFORMATION SYSTEMS DEVELOPMENT                      100,160         100,160         100,160  ..............  ..............
     ELECTRONIC ACQUISITION SERVICES ENVIRONMENT                        ..............  ..............           4,800          +4,800          +4,800
                                                                       ---------------------------------------------------------------------------------
           TOTAL, OPERATIONAL SYSTEMS DEVELOPMENT                            4,695,789       4,573,872       4,503,120        -192,669         -70,752

     CLASSIFIED PROGRAMS                                                    11,172,183      10,957,653      11,399,189        +227,006        +441,536
                                                                       ---------------------------------------------------------------------------------
           TOTAL, RESEARCH, DEVELOPMENT, TEST & EVAL, AIR FORCE             25,428,046      25,117,692      25,374,286         -53,760        +256,594
--------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                Fiscal year       Committee        Change from
 Line                  Program element title                     2012 base      recommendation   budget estimate
----------------------------------------------------------------------------------------------------------------
    4 Materials                                                     114,166          124,166          +10,000
          Nanotechnology research                           ...............  ...............          +10,000
   11 Directed Energy Technology                                    106,196           85,317          -20,879
          Space Situational Awareness                       ...............  ...............          +10,000
          Delay electronic laser on a large aircraft        ...............  ...............          -30,879
   14 Advanced Materials for Weapon Systems                          47,890           62,890          +15,000
          Materials research and technology                 ...............  ...............          +15,000
   18 Aerospace Propulsion and Power Technology                     151,152          166,152          +15,000
          Silicon carbide research                          ...............  ...............          +15,000
   19 Electronic Combat Technology                                   32,941           26,941           -6,000
          Protection concepts for 6th generation aircraft   ...............  ...............           -2,000
           early to need
          Rapidly fieldable operational demonstrations--    ...............  ...............           -4,000
           unjustified request
   30 Advanced EHF MILSATCOM (SPACE)                                229,171          257,671          +28,500
          Operationally Responsive Space--transfer to line  ...............  ...............           -1,500
           54
          Space modernization initiatives--program          ...............  ...............          +30,000
           increase
   32 Space Control Technology                                       25,144           23,144           -2,000
          Operationally Responsive Space--transfer to line  ...............  ...............           -2,000
           54
   40 Pollution Prevention--Dem/Val                                   2,054            1,054           -1,000
          Forward financing                                 ...............  ...............           -1,000
   41 Joint Precision Approach and Landing Systems--  Dem/           57,975           12,975          -45,000
       Val
          Development contract award delay                  ...............  ...............          -45,000
   43 Battle Mgmt Com & Ctrl Sensor Development                     114,417          101,417          -13,000
          Excess to need                                    ...............  ...............          -13,000
   48 Weather Satellite Follow-on                                     2,000  ...............           -2,000
          Carryover of Fiscal Year 2012 funds               ...............  ...............           -2,000
   54 Operationally Responsive Space                        ...............          110,000         +110,000
          Authorized program increase                       ...............  ...............         +100,000
          Transfer from line 30--Advanced EHF  MILSATCOM    ...............  ...............           +1,500
          Transfer from line 32--Space Control Technology   ...............  ...............           +2,000
          Transfer from line 55--Tech Transition Program    ...............  ...............           +3,000
          Transfer from line 69--Space Based Infrared       ...............  ...............           +2,000
           System [SBIRS] High EMD
          Transfer from line 112--Global Positioning        ...............  ...............           +1,500
           System III--Operational Control Segment
   55 Tech Transition Program                                        37,558           34,558           -3,000
          Operationally Responsive Space--transfer to line  ...............  ...............           -3,000
           54
   56 NAVSTAR Global Positioning System (User Equipment)             96,840           76,840          -20,000
       (SPACE)
          Reduction to growth due to protracted pre-        ...............  ...............          -20,000
           Engineering and Manufacturing Development phase
   59 Nuclear Weapons Support                                        25,713  ...............          -25,713
          Transfer to Operation and Maintenance, Air Force  ...............  ...............          -25,713
           Line 12A--Global C3I and Early Warning
   60 Specialized Undergraduate Flight Training                       6,583            1,983           -4,600
          T-X contract delay                                ...............  ...............           -1,600
          Joint Primary Aircraft Training System forward    ...............  ...............           -3,000
           financing
   62 Joint Tactical Radio                                            2,594  ...............           -2,594
          Unjustified request                               ...............  ...............           -2,594
   65 Small Diameter Bomb [SDB]--EMD                                143,000          138,000           -5,000
          Other Product Development cost growth             ...............  ...............           -5,000
   66 Counterspace Systems                                           28,797           27,797           -1,000
          Historical excess from general reductions         ...............  ...............           -1,000
   69 Space Based Infrared System [SBIRS] High EMD                  448,594          466,594          +18,000
          Space Modernization Initiatives--program in-      ...............  ...............          +20,000
           crease
          Operationally Responsive Space--transfer to line  ...............  ...............           -2,000
           54
   72 Agile Combat Support                                           13,059           28,059          +15,000
          Power generation and storage research             ...............  ...............          +15,000
   73 Life Support Systems                                            9,720            6,720           -3,000
          Forward financing                                 ...............  ...............           -3,000
   77 F-35--EMD                                                   1,210,306        1,169,589          -40,717
          Block 4 follow-on development early to need       ...............  ...............           -8,117
          Security contract unjustified growth              ...............  ...............           -2,600
          Unjustified growth in Other                       ...............  ...............          -30,000
   83 Next Generation Aerial Refueling Aircraft                   1,815,588        1,738,488          -77,100
          Air Force identified forward financing            ...............  ...............          -77,100
   84 CSAR HH-60 Recapitalization                                   123,210          115,210           -8,000
          Unobligated prior year funds                      ...............  ...............           -8,000
   85 HC/MC-130 Recap RDT&E                                          19,039           10,739           -8,300
          Forward financing                                 ...............  ...............           -8,300
   86 B-2 Defensive Management System                               281,056          248,056          -33,000
          Program delay                                     ...............  ...............          -33,000
   92 C-27J Airlift Squadrons                               ...............            6,500           +6,500
          Retain Air Force force structure                  ...............  ...............           +6,500
  102 Space Test Program [STP]                                       10,051           45,051          +35,000
          Authorized program increase                       ...............  ...............          +35,000
  106 Space and Missile Center [SMC] Civilian Workforce             203,766          195,766           -8,000
          Excess to need                                    ...............  ...............           -8,000
  107 Acquisition and Management Support                             42,430           32,530           -9,900
          Recruiting and Development excessive growth       ...............  ...............           -2,700
          Acquisition systems unjustified cost growth       ...............  ...............           -2,400
          Transfer Electronic Acquisition Services          ...............  ...............           -4,800
           Environment to new line item
  108 General Skill Training                                          1,294  ...............           -1,294
          Excess to need                                    ...............  ...............           -1,294
  112 Global Positioning System III--Operational Control            371,595          370,095           -1,500
       Segment
          Operationally Responsive Space--transfer to line  ...............  ...............           -1,500
           54
  114 AF Integrated Personnel and Pay System [AF-IPPS]               91,697           45,697          -46,000
          Contract award delay                              ...............  ...............          -46,000
  121 Strat War Planning System--USSTRATCOM                          30,889           23,189           -7,700
          SWPS Increment 3 excess to need                   ...............  ...............           -7,700
  122 Night Fist--USSTRATCOM                                             10  ...............              -10
          Unjustified request                               ...............  ...............              -10
  126 Warfighter Rapid Acquisition Process [WRAP] Rapid              15,098            5,098          -10,000
       Transition Fund
          Unobligated balances                              ...............  ...............          -10,000
  127 MQ-9 UAV                                                      147,971          135,171          -12,800
          Technology Insertion forward financing            ...............  ...............          -12,800
  129 A-10 Squadrons                                                 13,538           11,538           -2,000
          Forward financing                                 ...............  ...............           -2,000
  130 F-16 Squadrons                                                190,257          176,757          -13,500
          Flight Test unjustified increase                  ...............  ...............           -3,500
          Combat Avionics Programmed Extension Suite        ...............  ...............          -10,000
           program delay
  131 F-15E Squadrons                                               192,677          171,677          -21,000
          Forward financing                                 ...............  ...............          -21,000
  133 F-22A Squadrons                                               371,667          342,667          -29,000
          Should cost review savings                        ...............  ...............          -29,000
  135 Tactical AIM Missiles                                           8,234            6,634           -1,600
          Product Development cost growth                   ...............  ...............           -1,600
  136 Advanced Medium Range Air-to-Air Missile [AMRAAM]              87,041           77,041          -10,000
          Software Improvement unjustified growth           ...............  ...............          -10,000
  157 Command and Control [C2] Constellation                         18,086           15,786           -2,300
          Architecture and Systems Engineering unjustified  ...............  ...............           -2,300
           increase
  163 Distributed Training and Exercises                              4,425            3,225           -1,200
          Wargaming unjustified increase                    ...............  ...............           -1,200
  178 Global Combat Support System                                    6,512            3,512           -3,000
          Program restructure                               ...............  ...............           -3,000
  179 Global Command and Control System                               4,316            2,316           -2,000
          Forward financing                                 ...............  ...............           -2,000
  182 Airborne SIGINT Enterprise                                    129,106          109,106          -20,000
          Forward financing                                 ...............  ...............          -20,000
  190 Air Traffic Control, Approach, and Landing System              43,187           39,687           -3,500
       [ATCALS]
          NextGen forward financing                         ...............  ...............           -3,500
  191 Aerial Targets                                                 50,496           46,096           -4,400
          QF-16--late contract award                        ...............  ...............           -4,400
  196 Defense Joint Counterintelligence Activities                      342  ...............             -342
          Unobligated balances                              ...............  ...............             -342
  203 Spacelift Range System (SPACE)                                  8,760            8,360             -400
          Historical excess from general reductions         ...............  ...............             -400
  206 Endurance Unmanned Aerial Vehicles                             21,000           21,000          +58,000
          Long Dwell/Persistent ISR response for JUONs CC-  ...............  ...............          +58,000
           0151 and CC-0302
  207 Airborne Reconnaissance Systems                                96,735           76,735          -20,000
          Dismount Detection Radar funds excess to          ...............  ...............          -20,000
           contract award
  209 Distributed Common Ground/Surface Systems                      63,501           48,501          -15,000
          Data Compression contract award delay             ...............  ...............          -15,000
  213 Common Data Link [CDL]                                         38,094           36,694           -1,400
          Unjustified program growth                        ...............  ...............           -1,400
  217 JSPOC Mission System                                           54,645           53,045           -1,600
          Historical excess from general reductions         ...............  ...............           -1,600
  218 Rapid Cyber Acquisition                                         4,007            2,007           -2,000
          Unsustained funding level                         ...............  ...............           -2,000
  220 NUDET Detection System (SPACE)                                 64,965           63,365           -1,600
          ICADS/UGNT execution delays                       ...............  ...............           -1,600
  221 Space Situation Awareness Operations                           19,586           19,586  ................
          Air Force requested internal realignment--U.S.-   ...............  ...............          [11,200]
           Australia C-Band Radar Project
  226 C-17 Aircraft (IF)                                             99,225           86,225          -13,000
          Unobligated balances                              ...............  ...............          -13,000
  227 C-130J Program                                                 30,652           20,652          -10,000
          C130-J forward financing                          ...............  ...............          -10,000
  229 Light Mobility Aircraft [LiMA]                                    100  ...............             -100
          Program terminated                                ...............  ...............             -100
  231 KC-10s                                                         24,022           17,022           -7,000
          Aircraft Modernization Program forward financing  ...............  ...............           -7,000
  232 Operational Support Airlift                                     7,471           18,571          +11,100
          Air Force identified shortfall--VC-25 Avionics    ...............  ...............          +11,100
           Modernization Program
  237 Logistics Information Technology [LOGIT]                      119,327           77,327          -42,000
          Unobligated balances                              ...............  ...............          -42,000
  238 Support Systems Development                                    15,873           55,873          +40,000
          Alternative energy research                       ...............  ...............          +40,000
  242 Other Personnel Activities                                        117  ...............             -117
          Unobligated balances                              ...............  ...............             -117
  246 Air Force Studies and Analysis Agency                           1,175              675             -500
          Unobligated balances                              ...............  ...............             -500
      Classified Programs                                        11,172,183       11,399,189         +227,006
          Classified Programs                               ...............  ...............         +227,006
      Electronic Acquisition Services Environment           ...............            4,800           +4,800
          Transferred from Acquisition and Management       ...............  ...............           +4,800
           Support for better transparency and control
----------------------------------------------------------------------------------------------------------------

    Air Force Application of Small Business Innovative Research 
[SBIR].--During the detailed review of the fiscal year 2013 
budget submission, the Committee noted a questionably 
inconsistent sourcing of funds from line items within the 
Research, Development, Test and Evaluation, Air Force [RDT&E, 
AF] appropriation to fund SBIR. Review of the initial data 
revealed two trends: (1) space programs were heavily sourced to 
fund SBIR while other portfolios were not taxed, and (2) some 
programs were sourced higher than the standard 2.7 to 3.1 
percent. SBIR should be calculated and applied evenly based on 
extramural percentages, but it appears the Air Force does not 
follow this standard calculation procedure.
    After reviewing more detailed data provided by the Air 
Force, the Committee found 15 fiscal year 2012 programs were 
sourced to fund SBIR between 3.7 and 9.6 percent with one 
program actually sourced 100 percent. Space programs accounted 
for 53 percent of these programs. In the fiscal year 2011 
appropriation, 17 programs were sourced between 3.5 and 15.3 
percent with eight of these programs, or 47 percent, falling 
within the space portfolio. The Committee notes that space-
related line items in the RDT&E, AF make up 15 percent of the 
total line items and is concerned that they are 
disproportionately taxed to fund SBIR.
    The Committee is also concerned that the Air Force is using 
SBIR to circumvent the congressional reprogramming approval 
process. By sourcing funds through SBIR and below threshold 
reprogrammings, the Air Force has, in the cases of Joint 
National Training Center, Advanced Communication Systems, B-52 
Squadrons, Aircraft Engine Component Improvement Program, and 
Information Systems Security Program, reduced the programs past 
the point that triggers congressional reprogramming approval.
    The Committee directs the Assistant Secretary of the Air 
Force for Financial Management to review the current Air Force 
SBIR sourcing process, develop and implement corrective 
actions, and within 180 days of enactment of this act provide a 
report to the congressional defense committees describing the 
origin of the problem and the corrective actions the Air Force 
plans to implement to ensure these violations do not occur in 
the future.
    Advanced Composite Research and Development.--The Committee 
encourages the Secretary of the Air Force to conduct a program 
for advanced composite research and development for aerospace 
vehicles to demonstrate the ability of advanced composite 
technology to expand the flight envelope and improve the 
performance and affordability of current and future aerospace 
platforms, including unmanned aerial vehicles.
    Sensors Research by Air Force Minority Leaders Program.--
The Committee encourages the Air Force Research Laboratory to 
carry out sensors research activities conducted by the Air 
Force Minority Leaders program for research in the disciplines 
of materials and processing, sensors, and related enabling 
academic specialties, and to meet critical defense 
capabilities, science and technology, future workforce, and 
technical program objectives for the United States Air Force.
    Pilot Hearing Protection.--The Committee encourages the Air 
Force to leverage advances in active noise reduction devices 
developed by the Combating Terrorism Technology Support program 
to advance hearing protection for pilots using legacy helmet 
models.
    Aerial Internet Protocol Networking.--The Committee is 
aware of the Air Force research and development efforts to help 
address complex problems in aerial Internet protocol [IP] 
networking, to include ensuring IP-based networks deliver 
rapid, reliable, real-time tactical information. The Committee 
believes standardization of the IP-based architecture could 
provide tangible benefit to the warfighter through enhanced 
tactical situational awareness, improved combat lethality and 
increased force protection. The Air Force is encouraged to 
expedite further operational testing of this new capability.
    Nuclear Weapons Support.--In previous budget submissions, 
the Research, Development, Test and Evaluation, Air Force 
[RDT&E, AF] Nuclear Weapons Support line item contained a 
number of development weapon system programs. In fiscal year 
2013, the Air Force transferred all development weapon system 
programs to more appropriate line items leaving only support 
funding in the Nuclear Weapons Support line item. The Committee 
notes that the planned fiscal year 2013 activities are very 
similar to activities performed by other command functions. Air 
Combat Command and Air Mobility Command perform the same 
acquisition insight and weapon system oversight role utilizing 
the Operation and Maintenance, Air Force account. The Committee 
believes the Air Force Nuclear Weapons Center should be 
normalized as part of the Air Force command structure and 
should be funded similar to other command units. Therefore, the 
Committee transfers $25,713,000 from RDT&E, AF to Operation and 
Maintenance, Air Force.
    Acquisition and Management Support.--With the Air Force's 
implementation of efficiencies and overall reduction to 
programs in the fiscal year 2013 budget request, the Committee 
notes a disproportionate growth in the Acquisition and 
Management Support line item. This line item, which mainly 
funds acquisition support and oversight, grows 32.5 percent 
over the fiscal year 2012 appropriated amount. After 
specifically questioning the growth of this program, the Air 
Force identified that $4,800,000 was added for a new contract-
writing information system called Electronic Acquisition 
Services Environment. To ensure future transparency and enable 
oversight of this new information system, the Committee 
transfers funding for the Electronic Acquisition Services 
Environment into a new line item. In addition, since the Air 
Force did not adequately justify the growth in support costs, 
the Committee recommends a reduction of $5,100,000, which is 
consistent with the fiscal year 2012 appropriated level. At the 
Committee's request, the Air Force provided additional detail 
for the training and support costs funded under this program. 
The Committee believes that some of the training courses 
identified are more properly funded from the Operation and 
Maintenance, Air Force appropriation. The Committee notes that 
some of the justified efforts, for example cost estimating, are 
duplicative of efforts more properly performed by other Air 
Force organizations. Therefore, the Committee directs the Air 
Force Administrative Assistant to perform a comprehensive 
review of the activities performed under this line item to 
ensure they are properly funded within the Research, 
Development, Test and Evaluation, Air Force appropriation, and 
to ensure they do not duplicate efforts more properly performed 
by other Air Force organizations to include Air Force Material 
Command and Air Force Financial Management. The Committee also 
directs the Air Force Administrative Assistant provide a 
report, within 180 days of enactment of this act, providing the 
outcome of the review and a summary of corrective actions 
taken.
    B-52 Strategic Radar Replacement [SR2].--The Committee is 
aware the Air Force conducted a lengthy analysis of 
alternatives in 2011 to address a Strategic Radar Replacement 
[SR2] for the B-52H. The existing APQ-166 radar was produced in 
the 1960s, has a 20 to 30 hour mean-time between failure rate, 
and capability limitations. The Committee understands that the 
current APQ-166 radar is costly to operate and maintain. 
Therefore, the Committee encourages the Secretary of the Air 
Force to reconsider the decision to terminate the SR2 program.
    Air Force Command, Control, Intelligence, Surveillance, and 
Reconnaissance [C2ISR] Fleet.--The Committee is aware that the 
Air Force's critical manned C2ISR aircraft are high-demand 
assets facing low availability rates, end-of-life issues, and 
growing sustainment costs. The Committee is also aware that the 
Air Force recently completed an analysis of alternatives for 
recapitalization of the ground moving target indicator 
capability currently met by the Joint Surveillance and Target 
Attack Radar System [JSTARS] and that the Air Force has 
deliberately chosen to delay recapitalization due to fiscal 
limitations. Recognizing that the entire C2ISR fleet will need 
to be recapitalized around the same time, the Committee 
encourages the Secretary of the Air Force to explore a holistic 
replacement approach and perform a cost benefit analysis that 
takes into account operational cost savings from a new, modern 
aircraft with a common logistics chain, and common training. 
The Committee believes that significant cost savings can be 
garnered by recapitalizing the fleet with a single, common 
platform.
    Communication, Navigation and Surveillance/Air Traffic 
Management [CNS/ATM].--In the fiscal year 2013 budget request, 
the Air Force proposes to terminate the C-130H Avionics 
Modernization Program [AMP] and begin a modification program 
that addresses mainly compliance with international navigation 
standards for flying in civil airspace, which is the most 
pressing upgrade for these airframes. While the Committee 
supports the Air Force's decision to pursue a less costly 
solution, the Committee is concerned that the requirements for 
a CNS/ATM solution for the C-130H aircraft are not final and 
that the requirements may grow to create another costly 
modernization program. The Committee encourages the Air Force 
to find an affordable CNS/ATM solution that ensures near-term 
modernization of the C-130H aircraft.
    Military Global Positioning System User Equipment.--The 
budget request contains $96,840,000 for continued development 
of Military Global Positioning System [GPS] User Equipment 
[MGUE]. The MGUE program is necessary to allow the armed forces 
to take advantage of new signals and other capabilities, such 
as substantially greater resistance to jamming of GPS signals, 
that are integrated on the latest generations of GPS 
satellites.
    The MGUE program is a follow-on to the Modernized User 
Equipment program begun in 2006, with three contractors 
performing risk-reduction activities. The budget request 
proposes to continue funding three contractors for technology 
development efforts while delaying a production decision until 
fiscal year 2017, as opposed to the previous plan to select the 
best two proposals for more advanced development activities.
    The Committee believes that delaying a down-select in 
contractors is not justified under the current fiscal 
environment. Investments in this important technology should be 
prioritized to the best performers in a competitive 
environment. Therefore, the Committee recommends a reduction of 
$20,000,000, which will sustain robust funding for continued 
development of the two most competitive proposals in fiscal 
year 2013.
    Space Modernization Initiative.--Last year, the Air Force 
initiated the Evolutionary Acquisition for Space Efficiency 
[EASE] strategy to stabilize the industrial base, manage cost, 
and increase capabilities for selected satellite programs. One 
facet of the program is to maintain a steady investment in 
capability insertion programs, now known as the Space 
Modernization Initiative [SMI], to upgrade performance while 
avoiding obsolescence and diminishing manufacturing sources.
    The fiscal year 2013 budget makes substantial reductions to 
SMI: from fiscal years 2013 through 2017, the budget request 
cuts SMI funding by more than $820,000,000 from the Advanced 
Extremely High Frequency [AEHF] program and more than 
$340,000,000 from the Space Based Infrared System [SBIRS].
    While the fiscal constraints that led to reductions in SMI 
are well understood, the Committee believes that limiting 
investment in this area increases the risk that the government 
will be locked into old technologies, suppliers, and concepts. 
Therefore, the Committee recommends an increase of $30,000,000 
for AEHF SMI, to be used for radiation hardened manufacturing, 
hosted payloads, ``design for affordability,'' and related 
efforts and an increase of $20,000,000 for SBIRS SMI, to be 
used for alternative overhead persistent infrared technologies, 
hosted payloads, ``design for affordability,'' and related 
efforts.
    The Committee directs the Secretary of the Air Force to 
provide the congressional defense committees with a report 
detailing how the additional SMI funds will be used not fewer 
than 30 days prior to the obligation of any of these funds.
    Transfer of Civilian Pay.--In fiscal year 2012, the Air 
Force requested, and Congress approved, the transfer of 
civilian pay for the Space and Missile Systems Center [SMC] 
from the operation and maintenance appropriation to the 
Research, Development, Test and Evaluation [RDT&E] 
appropriation. The Committee understands that the Air Force may 
be evaluating this transfer as a model for other organizations.
    The Committee directs the Government Accountability Office 
[GAO] to submit a report to the congressional defense 
committees on the impacts of transferring civilian salaries to 
the RDT&E appropriation. At a minimum, the report shall address 
the extent to which the use of RDT&E funds for SMC civilian pay 
provides advantages or disadvantages in the management of the 
civilian workforce, the adequacy of financial controls to 
insure that RDT&E funds intended for civilian pay are not 
transferred to other purposes, and any areas of efficiency or 
risk that future transfers may entail.
    The Secretary of the Air Force is directed not to transfer 
civilian pay for any organization with greater than 20 civilian 
billets from operation and maintenance to RDT&E funds until the 
GAO report is submitted to the congressional defense 
committees. The Secretary may waive this restriction upon 
certification to the congressional defense committees that such 
a transfer is necessary for the interests of national defense.
    Space Launch.--The Committee remains concerned about the 
rising costs of space launch and recognizes and supports the 
Department's efforts to certify New Entrant space launch 
providers to enable competition and reduce program costs.
    The Committee will continue to closely review the 
Department's upcoming acquisition of booster cores to ensure it 
enables competition and reduces costs. To meet these goals, the 
Committee reiterates its view expressed in Senate Report 112-
77, which accompanied the Senate-reported version of the 
Defense Appropriations Act, 2012, which urged the Department 
``to retain flexibility with its block-buy acquisition strategy 
as opportunities for competition by new launch entrants become 
available.'' To achieve this flexibility, the Committee: (1) 
encourages the Department to provide the Committee within 90 
days of enactment of this act with an estimated date by which 
one or more new entrants is expected to complete the new 
entrant certification process; and (2) encourages the 
department to see that any sole-source launch contract ensures 
that new entrants can fully compete for EELV missions once one 
or more new entrants complete the new entrant certification 
process.
    The Committee also directs the Secretary of the Air Force 
to provide a written report to the congressional defense 
committees within 90 days of enactment of this act that 
describes the launch missions, beyond the Deep Space Climate 
Observatory mission and the Space Test Program, which will be 
open for competition by certified new launch entrants.
    Space Launch System.--The Committee understands that 
National Aeronautics and Space Administration [NASA] is 
developing a Space Launch System with significantly greater 
lift capability than any rocket currently available on the 
world market, capable of carrying an extremely large fairing 
that could accommodate payloads of unprecedented weight and 
size. The Committee directs the Secretary of Defense, in 
consultation with the Director of the National Reconnaissance 
Office and the NASA Administrator, to provide a report to the 
congressional defense committee within 180 days of enactment of 
this act on the potential national security uses and associated 
launch costs of the Space Launch System. The study should 
address the utility of the system as currently envisioned, and 
any modifications or additions that would substantially 
increase that utility. The report shall be classified with an 
unclassified executive summary.

        Research, Development, Test and Evaluation, Defense-Wide

Appropriations, 2012.................................... $19,193,955,000
Budget estimate, 2013...................................  17,982,161,000
House allowance.........................................  19,100,362,000
Committee recommendation................................  18,419,129,000

    The Committee recommends an appropriation of 
$18,419,129,000. This is $436,968,000 above the budget 
estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                [In thousands of dollars]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2013 budget        House         Committee   -------------------------------
                                         Item                                estimate        allowance    recommendation      Budget           House
                                                                                                                             estimate        allowance
--------------------------------------------------------------------------------------------------------------------------------------------------------
              RESEARCH, DEVELOPMENT, TEST & EVAL, DEFENSE-WIDE

     BASIC RESEARCH
     DTRA UNIVERSITY STRATEGIC PARTNERSHIP BASIC RESEARCH                       45,071          45,071          45,071  ..............  ..............
     DEFENSE RESEARCH SCIENCES                                                 309,051         309,051         309,051  ..............  ..............
     BASIC RESEARCH INITIATIVES                                                 19,405          15,005          19,405  ..............          +4,400
     BASIC OPERATIONAL MEDICAL RESEARCH SCIENCE                                 39,676          39,676          39,676  ..............  ..............
     NATIONAL DEFENSE EDUCATION PROGRAM                                         87,979          87,979          87,979  ..............  ..............
     CHEMICAL AND BIOLOGICAL DEFENSE PROGRAM                                    50,566          50,566          50,566  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, BASIC RESEARCH                                               551,748         547,348         551,748  ..............          +4,400

     APPLIED RESEARCH
     JOINT MUNITIONS TECHNOLOGY                                                 20,615          20,615          20,615  ..............  ..............
     BIOMEDICAL TECHNOLOGY                                                     110,900         110,900         100,900         -10,000         -10,000
     HISTORICALLY BLACK COLLEGES & UNIV [HBCU]                          ..............          35,599  ..............  ..............         -35,599
     LINCOLN LABORATORY RESEARCH PROGRAM                                        36,826          36,826          36,826  ..............  ..............
     SYSTEMS 2020 APPLIED RESEARCH                                               7,898  ..............           7,898  ..............          +7,898
     INFORMATION AND COMMUNICATIONS TECHNOLOGY                                 392,421         402,421         372,421         -20,000         -30,000
     COGNITIVE COMPUTING SYSTEMS                                                30,424          30,424          30,424  ..............  ..............
     BIOLOGICAL WARFARE DEFENSE                                                 19,236          19,236          19,236  ..............  ..............
     CHEMICAL AND BIOLOGICAL DEFENSE PROGRAM                                   223,269         223,269         223,269  ..............  ..............
     JOINT DATA MANAGEMENT ADVANCED DEVELOPMENT                                 13,753           8,753           9,753          -4,000          +1,000
     CYBER SECURITY RESEARCH                                                    18,985          11,485          12,985          -6,000          +1,500
     HUMAN, SOCIAL AND CULTURE BEHAVIOR MODELING [HSCB] APP                      6,771           6,771           6,771  ..............  ..............
     TACTICAL TECHNOLOGY                                                       233,209         233,209         218,209         -15,000         -15,000
     MATERIALS AND BIOLOGICAL TECHNOLOGY                                       166,067         166,067         176,067         +10,000         +10,000
     ELECTRONICS TECHNOLOGY                                                    222,416         222,416         214,416          -8,000          -8,000
     WEAPONS OF MASS DESTRUCTION DEFEAT TECHNOLOGIES                           172,352         172,352         172,352  ..............  ..............
     SPECIAL OPERATIONS TECHNOLOGY DEVELOPMENT                                  28,739          28,739          41,591         +12,852         +12,852
                                                                       ---------------------------------------------------------------------------------
           TOTAL, APPLIED RESEARCH                                           1,703,881       1,729,082       1,663,733         -40,148         -65,349

     ADVANCED TECHNOLOGY DEVELOPMENT
     JOINT MUNITIONS ADVANCED TECH INSENSITIVE MUNITIONS AD                     25,612          20,012          21,612          -4,000          +1,600
     SO/LIC ADVANCED DEVELOPMENT                                                26,324          26,324          26,324  ..............  ..............
     COMBATING TERRORISM TECHNOLOGY SUPPORT                                     77,144          77,144         127,144         +50,000         +50,000
     COUNTERPROLIFERATION INITIATIVES--PROLIF PREV & DEFEAT                    275,022         275,022         275,022  ..............  ..............
     BALLISTIC MISSILE DEFENSE TECHNOLOGY                                       79,975          75,975          79,975  ..............          +4,000
     JOINT DOD-DOE MUNITIONS TECHNOLOGY DEVELOPMENT                             20,032          20,032          20,032  ..............  ..............
     AGILE TRANSPO FOR THE 21ST CENTURY [AT21]--THEATER CA                       3,892           3,892           3,892  ..............  ..............
     SPECIAL PROGRAM--MDA TECHNOLOGY                                            36,685          36,685          36,685  ..............  ..............
     ADVANCED AEROSPACE SYSTEMS                                                174,316         174,316         166,816          -7,500          -7,500
     SPACE PROGRAMS AND TECHNOLOGY                                             159,704         159,704         159,704  ..............  ..............
     CHEMICAL AND BIOLOGICAL DEFENSE PROGRAM--ADVANCED DEV                     234,280         234,280         234,280  ..............  ..............
     JOINT ELECTRONIC ADVANCED TECHNOLOGY                                        6,983           6,983           6,983  ..............  ..............
     JOINT CAPABILITY TECHNOLOGY DEMONSTRATIONS                                158,263         158,263         158,263  ..............  ..............
     NETWORKED COMMUNICATIONS CAPABILITIES                                      25,393          25,393          25,393  ..............  ..............
     DATA TO DECISIONS ADVANCED TECHNOLOGY                                      13,754           8,754           9,754          -4,000          +1,000
     CYBER SECURITY ADVANCED RESEARCH                                           19,935          12,435          13,935          -6,000          +1,500
     HUMAN, SOCIAL AND CULTURE BEHAVIOR MODELING [HSCB] ADV                      8,235           8,235           8,235  ..............  ..............
     DEFENSE-WIDE MANUFACTURING SCIENCE AND TECHNOLOGY PROG                     21,966          21,966          51,966         +30,000         +30,000
     EMERGING CAPABILITIES TECHNOLOGY DEVELOPMENT                               24,662          24,662          24,662  ..............  ..............
     GENERIC LOGISTICS R&D TECHNOLOGY DEMONSTRATIONS                            24,605          24,605          24,605  ..............  ..............
     DEPLOYMENT AND DISTRIBUTION ENTERPRISE TECHNOLOGY                          30,678          30,678          30,678  ..............  ..............
     STRATEGIC ENVIRONMENTAL RESEARCH PROGRAM                                   65,282          65,282          65,282  ..............  ..............
     MICROELECTRONIC TECHNOLOGY DEVELOPMENT AND SUPPORT                         72,234          62,234          62,234         -10,000  ..............
     JOINT WARFIGHTING PROGRAM                                                   8,403           8,403           8,403  ..............  ..............
     ADVANCED ELECTRONICS TECHNOLOGIES                                         111,008         111,008         111,008  ..............  ..............
     COMMAND, CONTROL AND COMMUNICATIONS SYSTEMS                               237,859         237,859         229,859          -8,000          -8,000
     CLASSIFIED DARPA PROGRAMS                                                   3,000           3,000           3,000  ..............  ..............
     NETWORK-CENTRIC WARFARE TECHNOLOGY                                        236,883         236,883         239,383          +2,500          +2,500
     SENSOR TECHNOLOGY                                                         299,438         299,438         289,438         -10,000         -10,000
    5DEFENSE RAPID INNOVATION PROGRAM                                   ..............         250,000         200,000        +200,000         -50,000
     DISTRIBUTED LEARNING ADVANCED TECHNOLOGY DEVELOPMENT                       12,195          12,195          12,195  ..............  ..............
     SOFTWARE ENGINEERING INSTITUTE                                             30,036          30,036          30,036  ..............  ..............
     QUICK REACTION SPECIAL PROJECTS                                           107,002          82,002          92,002         -15,000         +10,000
     JOINT EXPERIMENTATION                                                      21,230          21,230          21,230  ..............  ..............
     MODELING AND SIMULATION MANAGEMENT OFFICE                                  47,433          47,433          43,433          -4,000          -4,000
     DIRECTED ENERGY RESEARCH                                                   46,944          41,944           2,384         -44,560         -39,560
     NEXT GENERATION AEGIS MISSILE                                             224,077         204,077          54,877        -169,200        -149,200
     TEST & EVALUATION SCIENCE & TECHNOLOGY                                     92,602          92,602          92,602  ..............  ..............
     OPERATIONAL ENERGY CAPABILITY IMPROVEMENT                                  26,244          26,244          26,244  ..............  ..............
     CWMD SYSTEMS                                                               53,946          23,946          38,946         -15,000         +15,000
     SPECIAL OPERATIONS ADVANCED TECHNOLOGY DEVELOPMENT                         45,317          45,317          45,317  ..............  ..............
     AVIATION ENGINEERING ANALYSIS                                                 861             861             861  ..............  ..............
     SOF INFORMATION AND BROADCAST SYSTEMS ADVANCED TECH                         4,959           4,959           4,959  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, ADVANCED TECHNOLOGY DEVELOPMENT                            3,194,413       3,332,313       3,179,653         -14,760        -152,660

     DEMONSTRATION & VALIDATION
     NUCLEAR AND CONVENTIONAL PHYSICAL SECURITY EQUIPMENT                       33,234          33,234          33,234  ..............  ..............
     RETRACT LARCH                                                              21,023          21,023          21,023  ..............  ..............
     WALKOFF                                                                    94,624          94,624          94,624  ..............  ..............
     ADVANCE SENSOR APPLICATIONS PROGRAM                                        16,958          16,958          18,958          +2,000          +2,000
     ENVIRONMENTAL SECURITY TECHNICAL CERTIFICATION PROGRAM                     75,941          75,941          75,941  ..............  ..............
     BALLISTIC MISSILE DEFENSE TERMINAL DEFENSE SEGMENT                        316,929         296,929         316,929  ..............         +20,000
     BALLISTIC MISSILE DEFENSE MIDCOURSE DEFENSE SEGMENT                       903,172         978,172         903,172  ..............         -75,000
     CHEMICAL AND BIOLOGICAL DEFENSE PROGRAM                                   179,023         179,023         179,023  ..............  ..............
     BALLISTIC MISSILE DEFENSE SENSORS                                         347,012         347,012         347,012  ..............  ..............
     BALLISTIC MISSILE DEFENSE ENABLING PROGRAMS                               362,711         362,711         362,711  ..............  ..............
     SPECIAL PROGRAMS--MDA                                                     272,387         272,387         258,787         -13,600         -13,600
     AEGIS BMD                                                                 992,407         992,407         992,407  ..............  ..............
     SPACE SURVEILLANCE & TRACKING SYSTEM                                       51,313          51,313          51,313  ..............  ..............
     BALLISTIC MISSILE DEFENSE SYSTEM SPACE PROGRAMS                             6,912           6,912           6,912  ..............  ..............
     BALLISTIC MISSILE DEFENSE C2BMC                                           366,552         341,552         366,552  ..............         +25,000
     BALLISTIC MISSILE DEFENSE JOINT WARFIGHTER SUPPORT                         55,550          55,550          55,550  ..............  ..............
     BALLISTIC MISSILE DEFENSE INTERGRATION AND OPERATIONS CENTER               63,043          63,043          63,043  ..............  ..............
      [MDIOC]
     REGARDING TRENCH                                                           11,371          11,371          11,371  ..............  ..............
     SEA BASED X-BAND RADAR [SBX]                                                9,730           9,730          29,730         +20,000         +20,000
     ISRAELI COOPERATIVE PROGRAMS                                               99,836         948,736         268,736        +168,900        -680,000
     BALLISTIC MISSILE DEFENSE TEST                                            454,400         454,400         454,400  ..............  ..............
     BALLISTIC MISSILE DEFENSE TARGETS                                         435,747         435,747         435,747  ..............  ..............
     HUMANITARIAN DEMINING                                                      13,231          13,231          13,231  ..............  ..............
     COALITION WARFARE                                                          11,398          11,398          11,398  ..............  ..............
     DEPARTMENT OF DEFENSE CORROSION PROGRAM                                     3,283           3,283          33,283         +30,000         +30,000
     DOD UNMANNED AIRCRAFT SYSTEM [UAS] COMMON DEVELOPMENT.                     12,368          12,368          12,368  ..............  ..............
     HUMAN, SOCIAL AND CULTURE BEHAVIOR MODELING [HSCB] RES                      5,131           5,131           5,131  ..............  ..............
     JOINT SYSTEMS INTEGRATION                                                   3,273           3,273           3,273  ..............  ..............
     JOINT FIRES INTEGRATION & INTEROPERABILITY TEAM                             7,364           7,364           7,364  ..............  ..............
     LAND-BASED SM-3 [LBSM3]                                                   276,338         266,338         276,338  ..............         +10,000
     AEGIS SM-3 BLOCK IIA CO-DEVELOPMENT                                       420,630         420,630         470,630         +50,000         +50,000
     PRECISION TRACKING SPACE SYSTEM RDT&E                                     297,375         242,375         297,375  ..............         +55,000
     ADVANCED REMOTE SENSOR TECHNOLOGY [ARST]                                   58,742          33,742           2,982         -55,760         -30,760
     JOINT ELECTROMAGNETIC TECHNOLOGY [JET] PROGRAM                              3,158           3,158           3,158  ..............  ..............
     NUCLEAR AND CONVENTIONAL PHYSICAL SECURITY EQUIPMENT                        6,817           6,817           6,817  ..............  ..............
     PROMPT GLOBAL STRIKE CAPABILITY DEVELOPMENT                               110,383         110,383         200,383         +90,000         +90,000
                                                                       ---------------------------------------------------------------------------------
           TOTAL, DEMONSTRATION & VALIDATION                                 6,399,366       7,188,266       6,690,906        +291,540        -497,360

     ENGINEERING & MANUFACTURING DEVELOPMENT
     CHEMICAL AND BIOLOGICAL DEFENSE PROGRAM                                   311,071         311,071         311,071  ..............  ..............
     ADVANCED IT SERVICES JOINT PROGRAM OFFICE [AITS-JPO]                       25,787          25,787          25,787  ..............  ..............
     JOINT TACTICAL INFORMATION DISTRIBUTION SYSTEM [JTIDS]                     20,688          20,688          20,688  ..............  ..............
     WEAPONS OF MASS DESTRUCTION DEFEAT CAPABILITIES                             5,749           5,749           5,749  ..............  ..............
     INFORMATION TECHNOLOGY DEVELOPMENT                                         12,699          12,699          12,699  ..............  ..............
     HOMELAND PERSONNEL SECURITY INITIATIVE                                        387             387             387  ..............  ..............
     DEFENSE EXPORTABILITY PROGRAM                                               1,859           1,859           1,859  ..............  ..............
     OUSD(C) IT DEVELOPMENT INITIATIVES                                          7,010           7,010           7,010  ..............  ..............
     DOD ENTERPRISE SYSTEMS DEVELOPMENT AND DEMONSTRATION                      133,104          64,104         133,104  ..............         +69,000
     DCMO POLICY AND INTEGRATION                                                25,269          25,269          25,269  ..............  ..............
     DEFENSE-WIDE ELECTRONIC PROCUREMENT CAPABILITY                             10,238          10,238          10,238  ..............  ..............
     GLOBAL COMBAT SUPPORT SYSTEM                                               19,670          19,670          19,670  ..............  ..............
     DOD ENTERPRISE ENERGY INFORMATION MANAGEMENT [EEIM]                         3,556           3,556           3,556  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, ENGINEERING & MANUFACTURING DEVELOPMENT                      577,087         508,087         577,087  ..............         +69,000

     RDT&E MANAGEMENT SUPPORT
     DEFENSE READINESS REPORTING SYSTEM [DRRS]                                   6,383           6,383           6,383  ..............  ..............
     JOINT SYSTEMS ARCHITECTURE DEVELOPMENT                                      3,845           3,845           3,845  ..............  ..............
     CENTRAL TEST AND EVALUATION INVESTMENT DEVELOPMENT                        144,109         144,109         156,109         +12,000         +12,000
     ASSESSMENTS AND EVALUATIONS                                                 2,419           2,419           2,419  ..............  ..............
     THERMAL VICAR                                                               8,214           8,214           8,214  ..............  ..............
     JOINT MISSION ENVIRONMENT TEST CAPABILITY [JMETC]                          19,380          19,380          19,380  ..............  ..............
     TECHNICAL STUDIES, SUPPORT AND ANALYSIS                                    32,266          32,266          32,266  ..............  ..............
     USD(A&T)--CRITICAL TECHNOLOGY SUPPORT                                         840             840             840  ..............  ..............
     FOREIGN MATERIAL ACQUISITION AND EXPLOITATION                              56,012          56,012          56,012  ..............  ..............
     JOINT THEATER AIR AND MISSILE DEFENSE ORGANIZATION                         55,508          55,508          55,508  ..............  ..............
     CLASSIFIED PROGRAM USD(P)                                          ..............         100,000         100,000        +100,000  ..............
     FOREIGN COMPARATIVE TESTING                                                18,174          18,174          18,174  ..............  ..............
     SYSTEMS ENGINEERING                                                        43,195          43,195          43,195  ..............  ..............
     STUDIES AND ANALYSIS SUPPORT                                                6,457           6,457           6,457  ..............  ..............
     NUCLEAR MATTERS--PHYSICAL SECURITY                                          4,901           4,901           4,901  ..............  ..............
     SUPPORT TO NETWORKS AND INFORMATION INTEGRATION                             6,307           6,307           6,307  ..............  ..............
     GENERAL SUPPORT TO USD (INTELLIGENCE)                                       6,601           6,601          16,601         +10,000         +10,000
     DEFENSE-WIDE ELECTRONIC PROCUREMENT                                ..............          20,000  ..............  ..............         -20,000
     CHEMICAL AND BIOLOGICAL DEFENSE PROGRAM                                    92,849          92,849          92,849  ..............  ..............
     SMALL BUSINESS INNOVATION RESEARCH/CHALLENGE ADMINISTR                      1,857           1,857           1,857  ..............  ..............
     DEFENSE TECHNOLOGY ANALYSIS                                                12,056          12,056          12,056  ..............  ..............
     DEFENSE TECHNICAL INFORMATION CENTER [DTIC]                                55,454          55,454          55,454  ..............  ..............
     R&D IN SUPPORT OF DOD ENLISTMENT, TESTING & EVALUATION                     16,364          16,364          16,364  ..............  ..............
     DEVELOPMENT TEST AND EVALUATION                                            15,110          15,110          20,110          +5,000          +5,000
     MANAGEMENT HEADQUARTERS (RESEARCH & DEVELOPMENT)                           69,767          69,767          69,767  ..............  ..............
     BUDGET AND PROGRAM ASSESSMENTS                                              4,454           4,454           4,454  ..............  ..............
     OPERATIONS SECURITY [OPSEC]                                                 2,637           2,637           2,637  ..............  ..............
     SUPPORT TO INFORMATION OPERATIONS [IO] CAPABILITIES                         8,238           8,238           8,238  ..............  ..............
     CYBER SECURITY INITIATIVE                                                   1,801           1,801           1,801  ..............  ..............
     INTELLIGENCE SUPPORT TO INFORMATION OPERATIONS [IO]                        16,041          16,041          16,041  ..............  ..............
     COCOM EXERCISE ENGAGEMENT AND TRAINING TRANSFORMATION                      77,475          57,475          77,475  ..............         +20,000
     MANAGEMENT HEADQUARTERS--MDA                                               34,855          34,855          34,855  ..............  ..............
     IT SOFTWARE DEV INITIATIVES                                                   104             104             104  ..............  ..............
     CLASSIFIED PROGRAMS                                                        64,255          64,255          64,255  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, RDT&E MANAGEMENT SUPPORT                                     887,928         987,928       1,014,928        +127,000         +27,000

     OPERATIONAL SYSTEMS DEVELOPMENT
     ENTERPRISE SECURITY SYSTEM [ESS]                                            8,866           8,866           8,866  ..............  ..............
     REGIONAL INTERNATIONAL OUTREACH & PARTNERSHIP FOR PEAC                      3,238           3,238           3,238  ..............  ..............
     OVERSEAS HUMANITARIAN ASSISTANCE SHARED INFORMATION SY                        288             288             288  ..............  ..............
     CHEMICAL AND BIOLOGICAL DEFENSE (OPERATIONAL SYSTEMS D                     14,745          14,745          14,745  ..............  ..............
     JOINT INTEGRATION AND INTEROPERABILITY                                      5,013           5,013           5,013  ..............  ..............
     PLANNING AND DECISION AID SYSTEM                                            3,922           3,922           3,922  ..............  ..............
     C4I INTEROPERABILITY                                                       72,574          72,574          72,574  ..............  ..............
     JOINT/ALLIED COALITION INFORMATION SHARING                                  6,214           6,214           6,214  ..............  ..............
     NATIONAL MILITARY COMMAND SYSTEM-WIDE SUPPORT                                 499             499             499  ..............  ..............
     DEFENSE INFO INFRASTRUCTURE ENGINEERING & INTEGRATION                      14,498          14,498          14,498  ..............  ..............
     LONG HAUL COMMUNICATIONS (DCS)                                             26,164          26,164          26,164  ..............  ..............
     MINIMUM ESSENTIAL EMERGENCY COMMUNICATIONS NETWORK                         12,931          12,931          12,931  ..............  ..............
     PUBLIC KEY INFRASTRUCTURE [PKI]                                             6,296           6,296           6,296  ..............  ..............
     KEY MANAGEMENT INFRASTRUCTURE [KMI]                                        30,948          30,948          30,948  ..............  ..............
     INFORMATION SYSTEMS SECURITY PROGRAM                                       11,780          11,780          11,780  ..............  ..............
     INFORMATION SYSTEMS SECURITY PROGRAM                                      191,452         191,452         191,452  ..............  ..............
     GLOBAL COMMAND AND CONTROL SYSTEM                                          36,575          36,575          36,575  ..............  ..............
     JOINT SPECTRUM CENTER                                                      24,278          24,278          24,278  ..............  ..............
     NET-CENTRIC ENTERPRISE SERVICES [NCES]                                      2,924           2,924           2,924  ..............  ..............
     JOINT MILITARY DECEPTION INITIATIVE                                         1,294           1,294           1,294  ..............  ..............
     TELEPORT PROGRAM                                                            6,050           6,050           6,050  ..............  ..............
     SPECIAL APPLICATIONS FOR CONTINGENCIES                                     17,058          17,058          17,058  ..............  ..............
     CYBER SECURITY INITIATIVE                                                   4,189           4,189           4,189  ..............  ..............
     CRITICAL INFRASTRUCTURE PROTECTION [CIP]                                   10,462          10,462          10,462  ..............  ..............
     POLICY R&D PROGRAMS                                                         6,360           6,360           6,360  ..............  ..............
     NET CENTRICITY                                                             21,190          21,190          21,190  ..............  ..............
     DISTRIBUTED COMMON GROUND/SURFACE SYSTEMS                                   7,114           7,714           7,114  ..............            -600
     DISTRIBUTED COMMON GROUND/SURFACE SYSTEMS                                   3,247           3,247           3,247  ..............  ..............
     MQ-1 PREDATOR A UAV                                                         1,355           1,355           1,355  ..............  ..............
     HOMELAND DEFENSE TECHNOLOGY TRANSFER PROGRAM                                2,303           2,303           2,303  ..............  ..............
     INT'L INTELLIGENCE TECHNOLOGY ASSESSMENT, ADVANCEMENT                       1,478           1,478           1,478  ..............  ..............
     INDUSTRIAL PREPAREDNESS                                                    27,044          27,044          27,044  ..............  ..............
     LOGISTICS SUPPORT ACTIVITIES                                                4,711           4,711           4,711  ..............  ..............
     MANAGEMENT HEADQUARTERS (JCS)                                               4,100           4,100           4,100  ..............  ..............
     MQ-9 UAV                                                                    3,002           3,002           3,002  ..............  ..............
     SPECIAL OPERATIONS AVIATION SYSTEMS ADVANCED DEV                           97,267          97,267          97,267  ..............  ..............
     SPECIAL OPERATIONS TACTICAL SYSTEMS DEVELOPMENT                               821             821             821  ..............  ..............
     SPECIAL OPERATIONS INTELLIGENCE SYSTEMS DEVELOPMENT                        25,935          25,935          25,935  ..............  ..............
     SOF OPERATIONAL ENHANCEMENTS                                               51,700          65,700          47,700          -4,000         -18,000
     SPECIAL OPERATIONS CV-22 DEVELOPMENT                                        1,822           1,822           1,822  ..............  ..............
     MISSION TRAINING AND PREPARATION SYSTEMS [MTPS]                            10,131          10,131           8,807          -1,324          -1,324
     MC130J SOF TANKER RECAPITALIZATION                                         19,647          19,647          19,647  ..............  ..............
     SOF COMMUNICATIONS EQUIPMENT AND ELECTRONICS SYSTEMS                        2,225           2,225           2,225  ..............  ..............
     SOF TACTICAL RADIO SYSTEMS                                                  3,036           3,036           3,036  ..............  ..............
     SOF WEAPONS SYSTEMS                                                         1,511           1,511           1,511  ..............  ..............
     SOF SOLDIER PROTECTION AND SURVIVAL SYSTEMS                                 4,263           4,263           4,263  ..............  ..............
     SOF VISUAL AUGMENTATION, LASERS & SENSOR SYSTEMS                            4,448           4,448           4,448  ..............  ..............
     SOF TACTICAL VEHICLES                                                      11,325          11,325          11,325  ..............  ..............
     SOF MUNITIONS                                                               1,515           1,515           1,515  ..............  ..............
     SOF ROTARY WING AVIATION                                                   24,430          24,430          20,430          -4,000          -4,000
     SOF UNDERWATER SYSTEMS                                                     26,405          61,405          34,405          +8,000         -27,000
     SOF SURFACE CRAFT                                                           8,573           8,573           8,573  ..............  ..............
     SOF GLOBAL VIDEO SURVEILLANCE ACTIVITIES                                    7,620           7,620           7,620  ..............  ..............
     SOF OPERATIONAL ENHANCEMENTS INTELLIGENCE                                  16,386          16,386          13,386          -3,000          -3,000
                                                                       ---------------------------------------------------------------------------------
           TOTAL, OPERATIONAL SYSTEMS DEVELOPMENT                              913,222         962,822         908,898          -4,324         -53,924

     DARPA CLASSIFIED                                                   ..............  ..............         -25,000         -25,000         -25,000
     CLASSIFIED PROGRAMS                                                     3,754,516       3,844,516       3,857,176        +102,660         +12,660
                                                                       ---------------------------------------------------------------------------------
           TOTAL, RESEARCH, DEVELOPMENT, TEST & EVAL, DEF-WIDE              17,982,161      19,100,362      18,419,129        +436,968        -681,233
--------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                                                    Change from
Line                             Item                               2013 budget      Committee        budget
                                                                     estimate     recommendation     estimate
----------------------------------------------------------------------------------------------------------------
   8 Biomedical Technology                                             110,900         100,900         -10,000
         Reduction to new starts                                ..............  ..............         -10,000
  12 Information and Communications Technology                         392,421         372,421         -20,000
         Excessive prior year funds                             ..............  ..............         -10,000
         Reduction in program growth                            ..............  ..............         -10,000
  17 Data to Decisions Applied Research                                 13,753           9,753          -4,000
         Unexecutable growth                                    ..............  ..............          -4,000
  18 Cyber Security Research                                            18,985          12,985          -6,000
         Excessive growth                                       ..............  ..............          -6,000
  20 Tactical Technology                                               233,209         218,209         -15,000
         Reduction in program growth                            ..............  ..............         -15,000
  21 Materials and Biological Technology                               166,067         176,067         +10,000
         Technology Transfer                                    ..............  ..............         +10,000
  22 Electronics Technology                                            222,416         214,416          -8,000
         Reduction in program growth                            ..............  ..............          -8,000
  24 Special Operations Technology Development                          28,739          41,591         +12,852
         Sensor development--restore unjustified reduction      ..............  ..............         +12,852
  25 Joint Munitions Advanced Technology                                25,612          21,612          -4,000
         Excessive growth                                       ..............  ..............          -4,000
  27 Combating Terrorism Technology Support                             77,144         127,144         +50,000
         Program increase                                       ..............  ..............         +50,000
  34 Advanced Aerospace Systems                                        174,316         166,816          -7,500
         Reduction in program growth                            ..............  ..............         -15,000
         Technology Transfer and Transition                     ..............  ..............          +7,500
  40 Data to Decisions Advanced Technology Development                  13,754           9,754          -4,000
         Excessive growth                                       ..............  ..............          -4,000
  42 Cyber Security Advanced Research                                   19,935          13,935          -6,000
         OSD identified excess need                             ..............  ..............          -6,000
  44 Defense-Wide Manufacturing Science and Technology Program          21,966          51,966         +30,000
         Authorization increase                                 ..............  ..............         +30,000
  50 Microelectronics Technology Development and Support                72,234          62,234         -10,000
         90nm Next Generation Foundry--early to need            ..............  ..............         -10,000
  54 Command, Control and Communications Systems                       237,859         229,859          -8,000
         Reduction to new starts                                ..............  ..............          -8,000
  56 Network-Centric Warfare Technology                                236,883         239,383          +2,500
         Reduction in program growth                            ..............  ..............          -5,000
         Technology Transfer and Transition                     ..............  ..............          +7,500
  57 Sensor Technology                                                 299,438         289,438         -10,000
         Reduction to new starts                                ..............  ..............         -10,000
 57X Defense Rapid Innovation Fund                              ..............         200,000        +200,000
   X
         Authorization increase                                 ..............  ..............        +200,000
  60 Quick Reaction Special Projects                                   107,002          92,002         -15,000
         Excessive growth                                       ..............  ..............         -15,000
  63 DOD Modeling and Simulation Management Office                      47,433          43,433          -4,000
         Reduction to new starts                                ..............  ..............          -4,000
  64 Directed Energy Research                                           46,944           2,384         -44,560
         Program adjustment                                     ..............  ..............         -44,560
  65 Next Generation Aegis Missile                                     224,077          54,877        -169,200
         MD70: Transfer to SM-3 IIA for test and development    ..............  ..............        -162,700
          risk reduction
         MD40: Excessive growth                                 ..............  ..............          -6,500
  69 CWMD Systems                                                       53,946          38,946         -15,000
         Unexecutable growth                                    ..............  ..............         -15,000
  77 Advanced Sensor Applications Program                               16,958          18,958          +2,000
         Authorization increase                                 ..............  ..............          +2,000
  85 Special Programs--MDA                                             272,387         258,787         -13,600
         Program adjustment                                     ..............  ..............         -13,600
  93 Sea Based X-Band Radar [SBX]                                        9,730          29,730         +20,000
         SBX software sustainment--unjustified reduction        ..............  ..............         +20,000
  94 Israeli Cooperative Programs                                       99,836         268,736        +168,900
         Arrow 3 Upper Tier Interceptor Program                 ..............  ..............         +23,800
         Arrow System Improvement Program                       ..............  ..............         +33,700
         David's Sling Weapon Program                           ..............  ..............        +111,400
  99 Department of Defense Corrosion Program                             3,283          33,283         +30,000
         Authorization increase                                 ..............  ..............         +30,000
 108 AEGIS SM-3 Block IIA Co-Development                               420,630         470,630         +50,000
         Transfer from line 65 for test development risk reduc- ..............  ..............         +50,000
            tion
 111 Advanced Remote Sensor Technology [ARST]                           58,742           2,982         -55,760
         Lack of acquisition strategy                           ..............  ..............         -55,760
 116 Prompt Global Strike Capability Development                       110,383         200,383         +90,000
         For Advanced Hypersonic Weapon                         ..............  ..............         +90,000
 137 Central Test and Evaluation Investment Development                144,109         156,109         +12,000
      [CTEIP]
         Restore unjustified reduction                          ..............  ..............         +12,000
 145 Classified Program USD(P)                                  ..............         100,000        +100,000
         Classified Program USD(P)                              ..............  ..............        +100,000
 151 General Support to USD (Intelligence)                               6,601          16,601         +10,000
         Irregular Warfare Resource Intelligence Program for    ..............  ..............         +10,000
          Emerging Technologies Collection, Exploitation and
          Research
 164 Development Test and Evaluation                                    15,110          20,110          +5,000
         Authorization increase                                 ..............  ..............          +5,000
 260 SOF Operational Enhancements                                       51,700          47,700          -4,000
         Excess prior year funds                                ..............  ..............          -4,000
 262 Mission Training and Preparation Systems [MTPS]                    10,131           8,807          -1,324
         SOCOM requested transfer to Defense-Wide line 78       ..............  ..............          -1,324
 271 SOF Rotary Wing Aviation                                           24,430          20,430          -4,000
         Excess of prior year funds                             ..............  ..............          -4,000
 272 SOF Underwater Systems                                             26,405          34,405          +8,000
         SOCOM requested transfer from Defense-Wide line 64     ..............  ..............          +8,000
 276 SOF Operational Enhancements Intelligence                          16,386          13,386          -3,000
         Excess of prior year funds                             ..............  ..............          -3,000
 999 Classified Programs                                             3,754,516       3,832,176        +102,660
         Classified Adjustment                                  ..............  ..............        +102,660
     DARPA--Authorization adjustment for unjustified special    ..............  ..............         -25,000
      access programs
----------------------------------------------------------------------------------------------------------------

    Conventional Prompt Global Strike.--The fiscal year 2013 
budget request includes $110,383,000 to continue the Prompt 
Global Strike program, a decrease from $174,830,000 in fiscal 
year 2012. The Committee recognizes the significance of the 
research and development of hypersonic technology for 
employment in a conventional prompt global strike weapon and 
notes the United States Army Space and Missile Defense Command/
Army Forces Strategic Command's successful intermediate range 
test flight of the Advanced Hypersonic Weapon [AHW] conducted 
on November 17, 2011. The Army's successful flight test 
followed two failed test flights of the Defense Advanced 
Research Project Agency's Hypersonic Test Vehicle-2 [HTV-2]. 
The Committee also understands the Department of Defense plans 
to develop a new hypersonic vehicle design which includes the 
development of a new booster and payload delivery vehicle.
    Considering the recent test outcomes and the fiscal 
constraints under which the Department is operating, the 
Committee believes the Department should focus efforts and 
resources on the initiative that achieved its flight test and 
data collection expectations. Therefore, the Committee 
recommends an increase of $90,000,000 to continue planning for 
and completing a second, longer range flight test of AHW. The 
Committee also directs that no funds are to be used for design 
or development efforts which are intended to support a 
significant departure from HTV-2 or AHW payload delivery 
vehicle designs.
    Data to Decisions Initiative.--The Committee supports the 
goals for the Data to Decisions Initiative but notes there is 
duplication with similar research on mission-driven data 
analysis and information management research funded by the Air 
Force and other services. The Committee provides a total of 
$9,700,000 and encourages the program to incorporate data 
quality research supported by the Air Force Research Lab for 
managing large data sets resulting from persistent 
surveillance.
    Software Coding.--The Committee encourages the Department 
of Defense to accelerate efforts under way to conduct secure 
software coding experiments and data analysis to determine 
which secure coding guidelines are practiced and effective and 
to develop a template for scalable cyber modeling and 
simulation. These experiments could improve the understanding 
of the cyber threat and mitigation of the threat, increase the 
military's ability to fight and survive during cyber attacks, 
measure the state of cyber security, and explore and exploit 
new ideas in cyber warfare.
    Unmanned Aerial System Common Development.--The Committee 
notes the passage of recent legislation directing the Federal 
Aviation Administration [FAA] to assess the suitability of 
integrating unmanned aerial systems [UAS] into the national 
airspace through the establishment of test ranges for civil 
use. The Committee recognizes that the FAA managed test ranges 
will lead to policies and standards governing future domestic 
UAS operations, including Department of Defense [DOD] 
operations. The Committee fully funds the request for Unmanned 
Aerial System Common Development and expects DOD to share the 
benefit of their UAS research, testing and experience with the 
FAA and NASA to support the FAA's development and demonstration 
of common UAS standards, architecture and technologies to 
ensure a consistent, nationwide approach to airspace 
integration.

                         MISSILE DEFENSE AGENCY

    Sea-Based X-Band Radar [SBX].--The fiscal year 2013 budget 
request includes no funds to develop and sustain the software 
necessary to maintain SBX operational capability for ballistic 
missile defense. The Committee has been informed by the Missile 
Defense Agency that while SBX will be placed in a limited test 
support status in fiscal year 2013, SBX remains a critical 
element of ballistic missile defense and is intended for recall 
to active operational status as needed, as was demonstrated 
when North Korea attempted to launch a satellite earlier this 
year. Therefore, the Committee does not believe it is prudent 
to neglect software development sustainment and recommends an 
additional $20,000,000 in Research, Development, Test and 
Evaluation, Defense-Wide only for SBX software development and 
sustainment.
    Justification of Classified Programs.--The Committee notes 
the poor briefing materials in support of classified programs 
despite requests made by the Committee for the inclusion of 
specific information. Therefore, the Committee does not believe 
that the budget request for these programs was fully and 
appropriately justified and recommends an undistributed 
reduction of $13,600,000. The Director of the Missile Defense 
Agency is directed to submit a list of classified projects 
against which this reduction is levied not later than 90 days 
after enactment of this act.
    Directed Energy.--The fiscal year 2013 budget request 
includes $44,560,000 for a new Directed Energy Research program 
following the termination of the Airborne Laser Test Bed 
[ALTB]. The Committee notes that there are currently no less 
than five separate directed energy science and technology 
programs ongoing in the Department of Defense, none of which 
have clearly defined and funded transition plans into programs 
of record. In addition, the Committee understands that the 
Missile Defense Agency intends to award a noncompetitive, sole-
source contract for integration of the yet-to-be-developed 
directed energy capability onto a high altitude long endurance 
platform that itself is currently under development. The 
Committee questions both the operational relevance of this 
scientific program, as well as the overall acquisition strategy 
during times of fiscal constraint. Therefore, the Committee 
recommends no funding for the Directed Energy program.
    Advanced Remote Sensor Technology [ARST].--The fiscal year 
2013 budget request includes $55,760,000 for ARST, a fiscal 
year 2013 new start initiative. The Committee notes the lack of 
an acquisition strategy and recommends no funding for this 
program.
    Airborne Weapons Layer [AWL].--The Committee notes that the 
Air Force and MDA failed to submit the AWL cost benefit 
analysis [CBA] to the congressional defense committees with the 
fiscal year 2013 budget submission. The Committee understands 
that the analysis is partially complete. Therefore, the 
Committee directs the Secretary of the Air Force and the 
Director of the Missile Defense Agency to brief the 
congressional defense committees not later than 90 days after 
enactment of this act on their findings to date.

                Operational Test and Evaluation, Defense

Appropriations, 2012....................................    $191,292,000
Budget estimate, 2013...................................     185,268,000
House allowance.........................................     185,268,000
Committee recommendation................................     223,768,000

    The Committee recommends an appropriation of $223,768,000. 
This is $38,500,000 above the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                [In thousands of dollars]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2013 budget        House         Committee   -------------------------------
                                         Item                                estimate        allowance    recommendation      Budget           House
                                                                                                                             estimate        allowance
--------------------------------------------------------------------------------------------------------------------------------------------------------
                  OPERATIONAL TEST AND EVALUATION, DEFENSE

     RDT&E MANAGEMENT SUPPORT
     OPERATIONAL TEST AND EVALUATION                                            72,501          72,501          91,501         +19,000         +19,000
     LIVE FIRE TESTING                                                          49,201          49,201          49,201  ..............  ..............
     OPERATIONAL TEST ACTIVITIES AND ANALYSES                                   63,566          63,566          83,066         +19,500         +19,500
                                                                       ---------------------------------------------------------------------------------
           TOTAL, RDT&E MANAGEMENT SUPPORT                                     185,268         185,268         223,768         +38,500         +38,500
                                                                       ---------------------------------------------------------------------------------
           TOTAL, OPERATIONAL TEST AND EVALUATION, DEFENSE                     185,268         185,268         223,768         +38,500         +38,500
--------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                                                    Change from
Line                             Item                               2013 budget      Committee        budget
                                                                     estimate     recommendation     estimate
----------------------------------------------------------------------------------------------------------------
   1 Operational Test and Evaluation                                    72,501          91,501         +19,000
         National cyber range shortfall                         ..............  ..............          +4,000
         Cyber testing shortfall                                ..............  ..............         +15,000
   3 Operational Test Activities and Analyses                           63,566          83,066         +19,500
         Restore unjustified reductions                         ..............  ..............         +19,500
----------------------------------------------------------------------------------------------------------------

    Cyber Assessment Enhancements.--The fiscal year 2013 budget 
request includes funds to enhance cyber assessment and training 
and mission rehearsal capabilities under the auspices of the 
Director, Operational Test and Evaluation. The Committee is 
aware of additional unfunded requirements and recommends an 
increase of $19,000,000 in fiscal year 2013 to fund 
improvements necessary for the development and evaluation of 
offensive and defensive cyber-warfighting capabilities in 
representative cyber-threat environments. The Committee notes 
that these enhancements will improve the cyber environment 
infrastructure and threat portrayal and allow for increased 
cyber assessments during exercises.

                                TITLE V

                     REVOLVING AND MANAGEMENT FUNDS

                     Defense Working Capital Funds

Appropriations, 2012....................................  $1,575,010,000
Budget estimate, 2013...................................   1,516,184,000
House allowance.........................................   1,516,184,000
Committee recommendation................................   1,516,184,000

    The Committee recommends an appropriation of 
$1,516,184,000. This is equal to the budget estimate.

                     National Defense Sealift Fund

Appropriations, 2012....................................  $1,100,519,000
Budget estimate, 2013...................................     608,136,000
House allowance.........................................     564,636,000
Committee recommendation................................     697,840,000

    The Committee recommends an appropriation of $697,840,000. 
This is $89,704,000 above the budget estimate.

                     committee recommended program

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
  020 MPF MLP                   38,000         144,464        +106,464
          Transfer      ..............  ..............         -38,000
           funds
           requested
           for MLP #4
           only to
           complete
           MLP #3
           AFSB, as
           requested
           by Navy
          Fully fund    ..............  ..............        +144,464
           MLP #3 AFSB
           only
  030 Post Delivery             39,386          32,090          -7,296
       and Outfitting
          MLP 3         ..............  ..............          -7,296
           Outfitting
           and Post
           delivery--e
           arly to
           need
  080 Research And              42,811          33,347          -9,464
       Development
          Transfer      ..............  ..............          -9,464
           funds
           requested
           for MLP
           AFSB to
           line 020 to
           complete
           MLP #3 AFSB
           only
------------------------------------------------------------------------

    Afloat Forward Staging Base [AFSB].--The fiscal year 2013 
budget request includes no funds for the installation of an 
Engineering Change Proposal [ECP] to convert Mobile Landing 
Platform [MLP] 3 to an AFSB. The Committee has been informed by 
the Navy that the installation of this capability requires a 
total investment of $135,000,000, which the Navy plans to fund 
by reallocating $38,000,000 that is requested in fiscal year 
2013 as Advance Procurement of a second AFSB to the MLP 3 ECP, 
and by requesting the balance of required funding in fiscal 
years 2014 and 2015. The Committee is concerned by this funding 
strategy and recommends transferring the $38,000,000, as 
requested by the Navy, to MLP 3 for the ECP. In addition, the 
Committee recommends an additional $97,000,000 in fiscal year 
2013 only for the MLP 3 ECP to fully fund the conversion of MLP 
3 to an AFSB, subject to the Department's approval of validated 
requirements.

                                TITLE VI

                  OTHER DEPARTMENT OF DEFENSE PROGRAMS

                         Defense Health Program

Appropriations, 2012.................................... $32,482,059,000
Budget estimate, 2013...................................  32,528,718,000
House allowance.........................................  32,902,234,000
Committee recommendation................................  32,240,788,000

    The Committee recommends an appropriation of 
$32,240,788,000. This is $287,930,000 below the budget 
estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                [In thousands of dollars]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                    Change from
                                                                            2013 budget        House         Committee   -------------------------------
                                         Item                                estimate        allowance    recommendation      Budget           House
                                                                                                                             estimate        allowance
--------------------------------------------------------------------------------------------------------------------------------------------------------

                           DEFENSE HEALTH PROGRAM

     OPERATION AND MAINTENANCE                                              31,349,279      31,122,095      30,707,349        -641,930        -414,746
     PROCUREMENT                                                               506,462         521,762         506,462  ..............         -15,300
     RESEARCH DEVELOPMENT TEST AND EVALUATION                                  672,977       1,258,377       1,026,977        +354,000        -231,400
                                                                       ---------------------------------------------------------------------------------
     O&M TRICARE BENEFIT REFORM AND PHARMACY SAVINGS                    ..............  ..............  ..............  ..............  ..............
                                                                       ---------------------------------------------------------------------------------
           TOTAL, DEFENSE HEALTH PROGRAM                                    32,528,718      32,902,234      32,240,788        -287,930        -661,446
--------------------------------------------------------------------------------------------------------------------------------------------------------

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                 2013 budget       Committee       Change from
                             Item                                  request       recommendation   budget request
----------------------------------------------------------------------------------------------------------------
OPERATION AND MAINTENANCE....................................       31,349,279       30,707,349         -641,930
    IN-HOUSE CARE............................................        8,625,507        8,558,870          -66,637
        Lower than Budgeted TEAM Strength....................  ...............  ...............          -66,637
    PRIVATE SECTOR CARE......................................       16,148,263       15,577,970         -570,293
        Authorization Adjustment to Restore Proposed TRICARE   ...............  ...............         +273,000
         Fee Increases.......................................
        TRICARE Historical Underexecution....................  ...............  ...............         -807,413
        Lower than Budgeted TEAM Strength....................  ...............  ...............          -35,880
    CONSOLIDATED HEALTH CARE.................................        2,309,185        2,309,185  ...............
    INFORMATION MANAGEMENT...................................        1,465,328        1,465,328  ...............
    MANAGEMENT HEADQUARTERS..................................          332,121          332,121  ...............
    EDUCATION AND TRAINING...................................          722,081          722,081  ...............
    BASE OPERATIONS AND COMMUNICATIONS.......................        1,746,794        1,741,794           -5,000
        Visual Information Systems--Excessive Growth.........  ...............  ...............           -5,000
PROCUREMENT..................................................          506,462          506,462  ...............
RESEARCH AND DEVELOPMENT.....................................          672,977        1,026,977         +354,000
    Research and Development.................................          672,977          672,977  ...............
        Peer-Reviewed Breast Cancer Research.................  ...............          120,000         +120,000
        Peer-Reviewed Ovarian Cancer Research................  ...............           10,000          +10,000
        Peer-Reviewed Prostate Cancer Research...............  ...............           64,000          +64,000
        Peer-Reviewed Traumatic Brain Injury and               ...............           60,000          +60,000
         Psychological Health Research.......................
        Peer Reviewed Medical Research Program...............  ...............           50,000          +50,000
        Joint Warfighter Medical Research....................  ...............           50,000          +50,000
                                                              --------------------------------------------------
          TOTAL..............................................       32,528,718       32,240,788         -287,930
----------------------------------------------------------------------------------------------------------------

    Defense Health Program Reprogramming Procedures.--The 
Committee remains concerned regarding the transfer of funds 
from Direct (or In-house) Care to pay for contractor-provided 
medical care. To limit such transfers and improve oversight 
within the Defense Health Program operation and maintenance 
account, the Committee includes a provision which caps the 
funds available for Private Sector Care under the TRICARE 
program subject to prior approval reprogramming procedures. The 
provision and accompanying report language included by the 
Committee should not be interpreted by the Department as 
limiting the amount of funds that may be transferred to the 
Direct Care System from other budget activities within the 
Defense Health Program. In addition, the Committee continues to 
designate the funding for the Direct Care System as a special 
interest item. Any transfer of funds from the Direct (or In-
house) Care budget activity into the Private Sector Care budget 
activity or any other budget activity will require the 
Department of Defense to follow prior approval reprogramming 
procedures.
    The Department shall also provide written notification to 
the congressional defense committees of cumulative transfers in 
excess of $15,000,000 out of the Private Sector Care budget 
subactivity. The Committee further directs the Assistant 
Secretary of Defense (Health Affairs) to provide quarterly 
reports to the congressional defense committees on budget 
execution data for all of the Defense Health Program accounts 
and to adequately reflect changes to the budget activities 
requested by the services in future budget submissions.
    Carryover.--For fiscal year 2013, the Committee recommends 
1 percent carryover authority for the operation and maintenance 
account of the Defense Health Program. The Committee directs 
the Assistant Secretary of Defense (Health Affairs) to submit a 
detailed spending plan for any fiscal year 2012 designated 
carryover funds to the congressional defense committees not 
fewer than 30 days prior to executing the carryover funds.
    Temporary End Strength Army Medical [TEAM] Reductions.--The 
President's fiscal year 2013 budget submission requested 
funding for TEAM, an additional 12,400 soldiers to mitigate the 
impact of nondeployable soldiers going through the Integrated 
Disability Evaluation System [IDES] and ensure operational 
readiness. This temporary end strength request has since been 
revised downward to 3,000 soldiers; therefore, the Committee 
recommends a reduction of $102,517,000.
    Private Sector Care Underexecution.--According to a review 
by the Government Accountability Office, the Department 
underexecuted its Private Sector Care budget by $771,604,000 in 
fiscal year 2010 and $1,356,245,000 in fiscal year 2011, for an 
average of 7.1 percent underexecution. In fiscal year 2012, the 
Congress reduced the Private Sector Care budget by $330,000,000 
due to this prior-year underexecution. The Department recently 
submitted an omnibus reprogramming for fiscal year 2012 in 
which they identified an additional $707,949,000 of unexecuted 
funding due to lower than budgeted private sector care cost 
growth rates. Given this continued trend of prior-year 
underexecution, the Committee recommends a reduction of 
$807,413,000 to the fiscal year 2013 budget request, a 5-
percent reduction, which is consistent with the fiscal year 
2012 anticipated execution level. The Committee urges the 
Department to submit future year budgets that are more closely 
aligned with recent provided care patterns.
    Traumatic Brain Injury [TBI]/Psychological Health [PH].--
The Committee recommends $60,000,000 above the fiscal year 2013 
budget request for continued research into treatment and 
prevention of traumatic brain injuries and improved 
psychological health. The Committee commends the Department of 
Defense on the use of a structured peer-reviewed process to 
recruit the highest qualified research entities for combating 
the ill-effects of TBI and psychological health in the 
military. The Committee directs the Assistant Secretary of 
Defense (Health Affairs) to submit a report to the 
congressional defense committees within 180 days of enactment 
of this act on expenditure and obligation data of additional 
funding added by Congress for psychological health and 
traumatic brain injury. This report should include information 
on agreements made with other government agencies.
    Peer Reviewed Medical Research Program.--The Committee 
recommends $50,000,000 for a Peer Reviewed Medical Research 
Program. The Committee directs the Secretary of Defense, in 
conjunction with the service Surgeons General, to select 
medical research projects of clear scientific merit and direct 
relevance to military health. Research areas considered under 
this funding are restricted to: alcohol and substance abuse, 
amyotrophic lateral sclerosis, autism, bone marrow failure, 
chronic kidney disease, chronic migraine and post-traumatic 
headache, composite tissue transplantation, dengue, DNA vaccine 
technology for postexposure prophylaxis, duchenne muscular 
dystrophy, dystonia, epilepsy, food allergies, Fragile X 
syndrome, gulf war illness, hantavirus, hereditary angioedema, 
inflammatory bowel disease, interstitial cystitis, kidney 
cancer, leishmaniasis, lupus, malaria, mesothelioma, multiple 
sclerosis, nanomedicine for drug delivery science, 
neuroblastoma, neurofibromatosis, orthopedics, pancreatitis, 
Parkinson's, polycystic kidney disease, post-traumatic 
osteoarthritis, pulmonary hypertension, rheumatoid arthritis, 
scleroderma, spinal cord injury, tinnitus, tuberous sclerosis 
complex, and vision research. The Committee emphasizes that the 
additional funding provided under the Peer Reviewed Medical 
Research Program shall be devoted only to the purposes listed 
above.
    Joint Warfighter Medical Research Program.--The Committee 
recommends $50,000,000 for the Joint Warfighter Medical 
Research Program. Funds shall be used to augment and accelerate 
high priority Department of Defense and service medical 
requirements and to continue prior year initiatives that are 
close to achieving their objectives and yielding a benefit to 
military medicine. These funds shall not be used for new 
projects or basic research. The funding shall be awarded at the 
Department's discretion following a review of medical research 
and development gaps, as well as unfinanced medical 
requirements of the services. Further, the Committee directs 
the Assistant Secretary of Defense (Health Affairs) to provide 
a report not later than 180 days after enactment of this act to 
the congressional defense committees, which lists the projects 
that receive funding. The report should include the amount of 
funding provided to each project and a thorough description of 
each project's research.
    Integrated Electronic Health Record [iEHR].--The fiscal 
year 2013 budget request includes $331,016,000 in the Defense 
Health Program for the continued development of an integrated 
electronic health record [iEHR]. This is a collaborative effort 
with the Department of Veterans Affairs in recognition of the 
need for both Departments to modernize their legacy electronic 
health record systems and to enhance information sharing 
between the Departments and the military's and veterans' 
healthcare providers. Both Departments agreed to purchase 
commercially available ``off the shelf'' components when 
feasible and leverage an ``open source'' approach to software 
acquisition in order to provide a cost-effective and efficient 
system that will expedite delivery of information sharing.
    After 4 years of working to establish a joint framework for 
which to collaborate and develop an integrated electronic 
health record, the two Departments are still operating as 
single entities. The Committee supports the creation of the 
Integrated Program Office [IPO] and recognizes this office as 
the single point of accountability for the development and 
implementation of the integrated electronic health record for 
both Departments. Unfortunately, since the creation of the IPO 
and the naming of a director, the Committee has seen little 
benefit derived from establishing this office in that both 
Departments still appear to operate as separate entities in 
this effort. Despite repeated inquiries, neither of the 
Departments nor the IPO has been able to provide Congress with 
the total cost of the integrated system. The Committee is 
concerned that the IPO is unable to maintain focus on its 
defined goals, provide effective governance, manage and 
maintain accountability on behalf of both Departments, and 
provide Congress with detailed expenditure plans as well as 
information regarding the progress and future plans for this 
project.
    Therefore, the Committee directs the Government 
Accountability Office [GAO] to provide a report, not later than 
180 days after enactment of this act, assessing the 
effectiveness of the IPO's governance model in providing 
oversight for this program and the adequacy of the office 
structure to support the development and deployment of the 
iEHR. This report will also identify and assess the budget and 
cost baseline for the iEHR as well as the schedule associated 
with the development and deployment of the system. This 
assessment will include input from both Departments. Finally, 
GAO will assess the quality of the plan and make 
recommendations aimed at minimizing cost and schedule risk, and 
enhancing transparency of the IPO's acquisition strategy for 
the iEHR. This report shall be delivered to the congressional 
defense committees and the Senate and House Subcommittees on 
Appropriations for Military Construction, Veterans Affairs, and 
Related Agencies.
    The Committee also directs the Department of Defense to 
provide written notification to the Committees on 
Appropriations of the House and Senate prior to obligating any 
contract or combination of contracts in excess of $5,000,000 as 
part of this $331,016,000.
    Integrated Disability Evaluation System.--The Committee 
remains concerned about the processing times for servicemembers 
in the Integrated Disability Evaluation System [IDES]. The 
Committee urges the Departments of Defense and Veterans Affairs 
to develop and operationalize an end-to-end information 
technology solution for the IDES in order to improve processing 
times and servicemembers' access to information regarding their 
IDES cases. The system should be interoperable between the 
Departments and capable of being integrated into the Virtual 
Lifetime Electronic Record.
    Physical Evaluation Board Liaison Officer [PEBLO] 
Training.--The Committee remains concerned about the quality of 
assistance provided to servicemembers by physical evaluation 
board liaison officers [PEBLO] during the disability evaluation 
process. To enhance the quality of the information, advice, and 
counsel servicemembers enrolled in the Integrated Disability 
Evaluation System [IDES] receive, the Department of Defense 
shall ensure PEBLO training standards and guidelines include a 
requirement for formal training within 3 months of assuming 
their position.
    The Committee priority in this effort is to address the 
needs of servicemembers as they are expedited through the IDES 
process. The Committee believes standardized training of 
liaison officers will further improve this effort within the 
Department.
    Armed Forces Institute of Regenerative Medicine.--The 
Committee supports the mission of the Armed Forces Institute of 
Regenerative Medicine and recognizes the multi-institutional 
consortia's achievements in the validation of new bone 
regeneration technology, wound healing, craniofacial 
reconstruction, and burn repair. The Committee encourages the 
Department of Defense to provide adequate funding to the 
clinical trial process and to continue to support this critical 
research which addresses the challenges of caring for 
servicemembers with multiple traumatic injuries.
    Military Integrative Medicine.--The Committee recognizes 
the growing interest in and use of holistic, integrated, and 
patient-centered practices and models of care within the 
Military Health System. Not later than 180 days from enactment 
of this act, the Secretary of Defense shall submit a report to 
the congressional defense committees with an explanation of the 
criteria used to evaluate the effectiveness of integrative 
medicine programs, the results of those evaluations, and the 
number of servicemembers receiving integrative medical 
treatment--by service and location of medical care. The report 
should further outline the Department's plans for future 
expansion of the evaluation and implementation of integrative 
medicine for broader military application.
    Multidisciplinary Brain Research.--The Committee encourages 
the Secretary of Defense to support multidisciplinary research 
toward translational medicine that may provide better 
diagnostic tools and treatment outcomes for servicemembers who 
suffer from traumatic brain injury, post-traumatic stress 
disorder, and other neurological diseases. With this support, 
the Secretary of Defense will enable the creation of a 
nationwide scientific consortium aimed at integrating 
nanotechnology, stem cell, cellular therapy, medical imaging, 
electronic medical records, information technology, and medical 
devices. The Committee encourages the Secretary of Defense to 
provide the capabilities necessary for researchers, scientists, 
surgeons, physicians, healthcare professionals, and patients to 
effectively communicate their findings and outcomes. With 
proper support, translational research outcomes would be 
augmented through near real-time access to information and its 
integration between researchers, physicians, hospitals, and 
patients. The Committee encourages the Secretary of Defense to 
establish this program through the Navy Bureau of Medicine and 
Surgery [BUMED]. The Committee directs the Secretary of Defense 
to provide a report not later than 90 days after enactment of 
this act on possible implementation of this program.
    Gender-Specific Health Care for Female Servicemembers.--The 
Committee notes that nearly 275,000 women have deployed in 
support of Operation Iraqi Freedom, Operation New Dawn, and 
Operation Enduring Freedom. In order for women to be fully 
integrated and effective members of the military, their unique 
health needs must be considered and met. The Committee is 
pleased that the Department, led by the Army, is studying this 
issue and encourages the Department to implement the 
recommendations of the Army's Women's Health Task Force, to 
include: ensuring deployment comfort packs include gender-
specific items for health and hygiene; ensuring all primary 
care providers, to include those in far forward environments, 
are trained to diagnose and treat common women's health issues 
such as menstrual cycle control, contraception, and common 
urogenital conditions; and ensuring proper supplies and 
equipment are available to accommodate the needs of female 
servicemembers.

           Chemical Agents and Munitions Destruction, Defense

Appropriations, 2012....................................  $1,554,422,000
Budget estimate, 2013...................................   1,301,786,000
House allowance.........................................   1,301,786,000
Committee recommendation................................   1,301,786,000

    The Committee recommends an appropriation of 
$1,301,786,000. This is equal to the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                                                                                     [Dollars in thousands]
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                                     Change from               Change from
Line                            Item                              Qty.     2013 budget      Qty.   House allowance    Qty.      Committee    ---------------------------------------------------
                                                                             estimate                                         recommendation    Qty.   Budget estimate    Qty.   House allowance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

        CHEMICAL AGENTS AND MUNITIONS DESTRUCTION, DEFENSE

   1 CHEM DEMILITARIZATION--OPERATION AND MAINTENANCE         .......          635,843  .......          635,843  .......          635,843  .......  ...............  .......  ...............
   3 CHEM DEMILITARIZATION--PROCUREMENT                       .......           18,592  .......           18,592  .......           18,592  .......  ...............  .......  ...............
   2 CHEM DEMILITARIZATION--RESEARCH, DEVELOPMENT, TEST AND   .......          647,351  .......          647,351  .......          647,351  .......  ...............  .......  ...............
      EVALUATION
                                                             -----------------------------------------------------------------------------------------------------------------------------------
           TOTAL, CHEMICAL AGENTS AND MUNITIONS DESTRUCTION,  .......        1,301,786  .......        1,301,786  .......        1,301,786  .......  ...............  .......
            DEFENSE
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

         Drug Interdiction and Counter-Drug Activities, Defense

Appropriations, 2012....................................  $1,209,620,000
Budget estimate, 2013...................................     999,363,000
House allowance.........................................   1,133,363,000
Committee recommendation................................   1,138,263,000

    The Committee recommends an appropriation of 
$1,138,263,000. This is $138,900,000 above the budget estimate.

                   COMMITTEE RECOMMENDED ADJUSTMENTS

    The following table details the adjustments recommended by 
the Committee:

  DRUG INTERDICTION AND COUNTER-DRUG ACTIVITIES, DEFENSE EXPLANATION OF
                        PROJECT LEVEL ADJUSTMENTS
                        [In thousands of dollars]
------------------------------------------------------------------------
                            Fiscal year      Committee      Change from
  Line         Item        2013 request   recommendation  budget request
------------------------------------------------------------------------
    010 Drug                   889,545       1,002,545        +113,000
         Interdiction
         and Counter-
         Drug
         Activities,
         Defense
            Counter-    ..............  ..............        +113,000
             Drug
             Program
             State
             Plans
    020 Drug Demand            109,818         135,718         +25,900
         Reduction
         Program
            Authorizat  ..............  ..............         +25,900
             ion
             increase
             expanded
             drug
             testing
                       -------------------------------------------------
              TOTAL,           999,363       1,138,263        +138,900
               DRUG
               INTERDI
               CTION
               AND
               COUNTER-
               DRUG
               ACTIVIT
               IES,
               DEFENSE
------------------------------------------------------------------------

             Joint Improvised Explosive Device Defeat Fund

Appropriations, 2012....................................................
Budget estimate, 2013...................................    $227,414,000
House allowance.........................................     217,414,000
Committee recommendation................................................

    The Committee does not recommend funding for the Joint 
Improvised Explosive Device Defeat Fund in the base budget and 
addresses this requirement in title IX.

                  Joint Urgent Operational Needs Fund

Appropriations, 2012....................................................
Budget estimate, 2013...................................     $99,477,000
House allowance.........................................................
Committee recommendation................................................

    The Committee recommends no funding for the Joint Urgent 
Operational Needs Fund.

                    Office of the Inspector General

Appropriations, 2012....................................    $346,919,000
Budget estimate, 2013...................................     273,821,000
House allowance.........................................     350,321,000
Committee recommendation................................     332,921,000

    The Committee recommends an appropriation of $332,921,000. 
This is $59,100,000 above the budget estimate. This increase is 
consistent with S. 3254, the National Defense Authorization Act 
for Fiscal Year 2013, as reported.

                               TITLE VII

                            RELATED AGENCIES

   Central Intelligence Agency Retirement and Disability System Fund

Appropriations, 2012....................................    $513,700,000
Budget estimate, 2013...................................     514,000,000
House allowance.........................................     514,000,000
Committee recommendation................................     514,000,000

    The Committee recommends an appropriation of $514,000,000. 
This is equal to the budget estimate.

               Intelligence Community Management Account

Appropriations, 2012....................................    $547,891,000
Budget estimate, 2013...................................     540,252,000
House allowance.........................................     511,476,000
Committee recommendation................................     542,346,000

    The Committee recommends an appropriation of $542,346,000. 
This is $2,094,000 above the budget estimate.

                               TITLE VIII

                           GENERAL PROVISIONS

    The following lists general provisions proposed by the 
Committee. The Committee recommends inclusion of several 
proposals which have been incorporated in previous 
appropriations acts, provisions requested for inclusion by the 
Department of Defense, and new provisions. The Committee 
recommendations are as follows:
    Sec. 8001. Publicity/Propaganda Limitation.--Retains a 
provision carried in previous years.
    Sec. 8002. Compensation/Employment of Foreign Nationals.--
Retains a provision carried in previous years.
    Sec. 8003. Obligation Rate of Appropriations.--Retains a 
provision carried in previous years.
    Sec. 8004. Obligations in Last 2 Months of Fiscal Year.--
Retains a provision carried in previous years.
    Sec. 8005. Transfers.--Retains and modifies a provision 
carried in previous years.
    Sec. 8006. Project Level Adjustments.--Retains and modifies 
a provision carried last year.
    Sec. 8007. Establishment of Reprogramming Baseline.--
Retains a provision carried in previous years.
    Sec. 8008. Working Capital Fund Cash Disbursements.--
Retains a provision carried in previous years.
    Sec. 8009. Special Access Programs Notification.--Retains a 
provision carried in previous years.
    Sec. 8010. Multiyear Procurement Authority.--Retains and 
modifies a provision carried in previous years.
    Sec. 8011. Humanitarian and Civic Assistance.--Retains a 
provision carried in previous years.
    Sec. 8012. Civilian Personnel Ceilings.--Retains a 
provision carried in previous years.
    Sec. 8013. Lobbying.--Retains a provision carried in 
previous years.
    Sec. 8014. Educational Benefits and Bonuses.--Retains a 
provision carried in previous years.
    Sec. 8015. Mentor-Protege Program.--Retains a provision 
carried in previous years.
    Sec. 8016. Anchor Chains.--Retains a provision carried in 
previous years.
    Sec. 8017. Demilitarization of Surplus Firearms.--Retains a 
provision carried in previous years.
    Sec. 8018. Relocations into the National Capital Region.--
Retains a provision carried in previous years.
    Sec. 8019. Indian Financing Act Incentives.--Retains a 
provision carried in previous years.
    Sec. 8020. Defense Media Activity.--Retains a provision 
carried in previous years.
    Sec. 8021. Burdensharing.--Retains a provision carried in 
previous years.
    Sec. 8022. Civil Air Patrol.--Retains and modifies a 
provision carried in previous years.
    Sec. 8023. Federally Funded Research and Development 
Centers.--Retains and modifies a provision carried in previous 
years.
    Sec. 8024. Carbon, Alloy or Armor Steel Plate.--Retains a 
provision carried in previous years.
    Sec. 8025. Congressional Defense Committees Definition.--
Retains a provision carried in previous years.
    Sec. 8026. Depot Maintenance Competition.--Retains a 
provision carried in previous years.
    Sec. 8027. Reciprocal Trade Agreements.--Retains a 
provision carried in previous years.
    Sec. 8028. Overseas Military Facility Investment.--Retains 
a provision carried in previous years.
    Sec. 8029. Walking Shield.--Retains a provision carried in 
previous years.
    Sec. 8030. Investment Item Unit Cost.--Retains a provision 
carried in previous years.
    Sec. 8031. Defense Working Capital Fund/Investment Item.--
Retains a provision carried in previous years.
    Sec. 8032. CIA Availability of Funds.--Retains a provision 
carried in previous years.
    Sec. 8033. GDIP Information Systems.--Retains a provision 
carried in previous years.
    Sec. 8034. Indian Tribes Environmental Impact.--Retains a 
provision carried in previous years.
    Sec. 8035. Compliance With the Buy America Act.--Retains a 
provision carried in previous years.
    Sec. 8036. Competition for Consultants and Studies 
Programs.--Retains a provision carried in previous years.
    Sec. 8037. Field Operating Agencies.--Retains a provision 
carried in previous years.
    Sec. 8038. Sale of F-22 to Foreign Nations.--Retains a 
provision carried in previous years.
    Sec. 8039. Organizational Analysis/Contracting Out.--
Retains a provision carried in previous years.
    Sec. 8040. Rescissions.--The Committee recommends a general 
provision rescinding funds from prior years as displayed below:

------------------------------------------------------------------------
                                                              Amount
------------------------------------------------------------------------
                   2007 Appropriations

Shipbuilding and Conversion, Navy:
    DDG-51 Destroyer....................................     $98,400,000
    DDG-51 Destroyer Advance Procurement................       2,500,000
    CVN Refueling Overhaul..............................      14,100,000

                   2011 Appropriations

Procurement of Ammunition, Army:
    Artillery Fuzes, All Types..........................       4,500,000
Other Procurement, Army:
    Defense Enterprise Wideband SATCOM Systems..........      10,900,000
    Tractor Desk........................................       6,900,000
    Prophet Ground......................................       6,750,000
    Sense Through The Wall..............................       1,845,000
    Long Range Advanced Scout Surveillance System.......      17,200,000
    BCT Network.........................................      36,000,000
    Handheld Standoff Mine Detection System.............      11,500,000
    Mounted Soldier System..............................       2,753,000
    Training Logistics Management.......................      21,000,000
Aircraft Procurement, Navy:
    EA-18G Advance Procurement..........................       5,960,000
    Special Support Equipment...........................       7,800,000
Shipbuilding and Conversion, Navy:
    DDG-51 Destroyer....................................     215,300,000
Weapons Procurement, Navy:
    Tomahawk............................................      19,000,000
    AMRAAM..............................................       2,086,000
Aircraft Procurement, Air Force:
    Light Mobility Aircraft.............................      65,300,000
    C-130 AMP...........................................      28,100,000
Missile Procurement, Air Force:
    AMRAAM..............................................       8,709,000
Other Procurement, Air Force:
    GCSS-AF (ECSS)......................................       9,500,000

                   2012 Appropriations

Operation and Maintenance, Defense Wide
    Office of Economic Adjustment Grant to Guam.........      21,000,000
Aircraft Procurement, Army
    Utility F/W Aircraft................................         800,000
    MQ-1 Payload--UAS...................................      31,600,000
    Global Air Traffic Management.......................      15,000,000
Other Procurement, Army:
    Tractor Desk........................................       2,200,000
    Gunshot Detection System............................       1,000,000
    Handheld Standoff Mine Detection System.............      34,000,000
    Mounted Soldier System..............................       5,000,000
    Training Logistics Management.......................      26,008,000
    Knight Family.......................................      31,400,000
Aircraft Procurement, Navy:
    F-18 E/F Advance Procurement........................       4,640,000
Shipbuilding and Conversion, Navy:
    Littoral Combat Ship................................      28,800,000
Shipbuilding and Conversion, Navy:
    DDG-51 Destroyer....................................      83,000,000
Weapons Procurement, Navy:
    Tomahawk............................................       2,900,000
    AMRAAM..............................................       6,915,000
    ASW Targets.........................................       8,200,000
    MK-48 Torpedo Mod...................................       5,448,000
    AIM-9X Sidewinder...................................       1,552,000
Other Procurement, Navy:
    Cooperative Engagement Capability...................       4,800,000
Procurement of Ammunition, Navy and Marine Corps:
    60mm, All Types.....................................       6,900,000
    81mm, All Types.....................................      22,276,000
    Demolition Munitions, All Types.....................      21,527,000
Procurement, Marine Corps:
    LAV PIP.............................................      86,555,000
    Weapons Under $5 million............................       2,776,000
    Follow on to SMAW...................................      37,300,000
    Air Operations C2 Systems...........................       8,700,000
Aircraft Procurement, Air Force:
    CVLSP...............................................      52,800,000
    Light Attack Armed Reconnaissance...................     115,049,000
    RQ-4 Advance Procurement............................      71,500,000
    B-52 CONECT.........................................      82,500,000
    C-130 AMP...........................................     207,200,000
    E-3 NGIFF...........................................      14,900,000
    C-17 Modifications..................................      37,750,000
Missile Procurement, Air Force:
    AMRAAM..............................................      42,624,000
    AIM-9X Sidewinder...................................       3,274,000
Other Procurement, Air Force:
    GCSS-AF FOS (ECSS)..................................      55,800,000
Procurement, Defense Wide:
    MDA--AN/TPY-2.......................................      16,000,000
Research, Development, Test and Evaluation, Army:
    Enhanced Medium Altitude Reconnaissance Surveillance       8,000,000
     System [EMARSS]....................................
Research, Development, Test and Evaluation, Navy:
    Joint Air-to-Ground Missile.........................      70,000,000
    Surface ASW.........................................       1,900,000
    Littoral Combat Ship................................      15,800,000
    AV-8B Aircraft--Eng Dev.............................       7,754,000
    Unmanned Carrier Launched Airborne Surveillance and        9,000,000
     Strike [UCLASS] System.............................
    Joint Strike Fighter [JSF]--EMD Navy................     100,000,000
    Medium Range Maritime UAS...........................       9,100,000
    Depot Maintenance (Non-IF)..........................       5,000,000
    Joint Precision Approach and Landing System.........      26,700,000
Research, Development, Test and Evaluation, Air Force:
    EW Development (MALD-J II)..........................       8,900,000
    Common Vertical Lift Support Platform...............       5,365,000
    Light Attack Armed Reconnaissance...................      11,021,000
    B-2 Squadrons.......................................      16,500,000
    Specialized Undergraduate Pilot Training............      12,000,000
    Minimum Essential Emergency Communications Network..       2,918,000
------------------------------------------------------------------------

    Sec. 8041. Civilian Technicians Reductions.--Retains a 
provision carried in previous years.
    Sec. 8042. Prohibition on Assistance to North Korea.--
Retains a provision carried in previous years.
    Sec. 8043. Reimbursement for Reserve Component Intelligence 
Personnel.--Retains a provision carried in previous years.
    Sec. 8044. Civilian Medical Personnel Reductions.--Retains 
a provision carried in previous years.
    Sec. 8045. Counter-Drug Activities Transfer.--Retains a 
provision carried in previous years.
    Sec. 8046. Ball and Roller Bearings.--Retains a provision 
carried in previous years.
    Sec. 8047. Buy American Computers.--Retains a provision 
carried in previous years.
    Sec. 8048. Transfer to Other Agencies.--Retains a provision 
carried in previous years.
    Sec. 8049. Restrictions on Transfer of Equipment and 
Supplies.--Retains a provision carried in previous years.
    Sec. 8050. Contractor Bonuses Due to Business 
Restructuring.--Retains a provision carried in previous years.
    Sec. 8051. Reserve Peacetime Support to Active Duty and 
Civilian Activities.--Retains a provision carried in previous 
years.
    Sec. 8052. Unexpended Balances.--Retains a provision 
carried in previous years.
    Sec. 8053. National Guard Distance Learning.--Retains a 
provision carried in previous years.
    Sec. 8054. Heating Plants in Europe.--Retains a provision 
carried in previous years.
    Sec. 8055. End-Item Procurement.--Retains a provision 
carried in previous years.
    Sec. 8056. Buy American Waivers.--Retains a provision 
carried in previous years.
    Sec. 8057. Training of Security Forces of a Foreign 
Country.--Retains a provision carried in previous years.
    Sec. 8058. Repair and Maintenance of Military Family 
Housing Units.--Retains a provision carried in previous years.
    Sec. 8059. JCTD Projects.--Retains a provision carried in 
previous years.
    Sec. 8060. Secretary of Defense Reporting Requirement.--
Retains a provision carried in previous years.
    Sec. 8061. Support to Other Government Agencies.--Retains a 
provision carried in previous years.
    Sec. 8062. Use of National Guard Forces.--Retains a 
provision carried in previous years.
    Sec. 8063. Armor Piercing Ammunition.--Retains a provision 
carried in previous years.
    Sec. 8064. Leasing Authority for National Guard Bureau.--
Retains a provision carried in previous years.
    Sec. 8065. Alcoholic Beverages.--Retains a provision 
carried in previous years.
    Sec. 8066. O&M, Army Transfer.--Retains and modifies a 
provision carried in previous years.
    Sec. 8067. Disbursements.--Retains a provision carried in 
previous years.
    Sec. 8068. Global Security Contingency Fund Authority.--
Retains a provision carried last year.
    Sec. 8069. Israeli Cooperative Programs.--Retains and 
modifies a provision carried in previous years.
    Sec. 8070. Assignment of Forces.--Retains and modifies a 
provision carried in previous years.
    Sec. 8071. Prior Year Shipbuilding.--Retains and modifies a 
provision carried last year.
    Sec. 8072. Intelligence Authorization.--Retains a provision 
carried in previous years.
    Sec. 8073. New Start Authority.--Retains a provision 
carried in previous years.
    Sec. 8074. Contingency Operations Budget Justification.--
Retains a provision carried in previous years.
    Sec. 8075. Nuclear Armed Interceptors.--Retains a provision 
carried in previous years.
    Sec. 8076. Grants.--Retains and modifies a provision 
carried in previous years.
    Sec. 8077. 53rd Weather Reconnaissance Squadron.--Retains a 
provision carried in previous years.
    Sec. 8078. Terrorism Information Awareness Program.--
Retains a provision carried in previous years.
    Sec. 8079. Notification of Reserve Mobilization.--Retains a 
provision carried in previous years.
    Sec. 8080. SCN Transfer Authority.--Retains a provision 
carried in previous years.
    Sec. 8081. SCN Judgment Fund.--Retains a provision carried 
in previous years.
    Sec. 8082. Army Tactical UAVs.--Retains and modifies a 
provision carried in previous years.
    Sec. 8083. Asia Pacific Regional Initiative.--Retains a 
provision carried in previous years.
    Sec. 8084. DNI R&D Waiver.--Retains a provision carried in 
previous years.
    Sec. 8085. Shipbuilding Obligations.--Retains a provision 
carried in previous years.
    Sec. 8086. Budget Exhibits for Intelligence Programs.--
Retains a provision carried in previous years.
    Sec. 8087. Arlington National Cemetery.--Includes a new 
provision providing authority for the Secretary of the Army to 
appropriate funds for real property maintenance and repair 
projects and activities at Arlington National Cemetery.
    Sec. 8088. Intelligence Baseline for Reprogramming.--
Retains a provision carried in previous years.
    Sec. 8089. Information Sharing.--Retains a provision 
carried in previous years.
    Sec. 8090. Future Years Intelligence Budget.--Retains a 
provision carried last year.
    Sec. 8091. Congressional Intelligence Committees 
Definition.--Retains a provision carried in previous years.
    Sec. 8092. Cost of War Report.--Retains a provision carried 
in previous years.
    Sec. 8093. Fisher House Authorization.--Retains a provision 
carried last year.
    Sec. 8094. Defense Acquisition Workforce Development 
Fund.--Retains a provision carried last year.
    Sec. 8095. Public Disclosure of Agency Reports.--Retains a 
provision carried in previous years.
    Sec. 8096. Contractor Compliance with the Civil Rights Act 
of 1964.--Retains a provision carried in previous years.
    Sec. 8097. ACORN Funding Prohibition.--Retains a provision 
carried in previous years.
    Sec. 8098. DOD-VA Medical Facility Demonstration.--Retains 
and modifies a provision carried in previous years.
    Sec. 8099. Travel and Conference Activities.--Includes a 
new provision placing restriction on funds for travel and 
conference activities.
    Sec. 8100. Senior Mentors.--Retains a provision carried in 
previous years.
    Sec. 8101. Armored Vehicles.--Retains a provision carried 
last year.
    Sec. 8102. Community Development Fund for Guam.--Retains 
and modifies a provision carried last year.
    Sec. 8103. Ship Modernization, Operations and Sustainment 
Fund.--Includes a new provision establishing the Ship 
Modernization, Operations and Sustainment Fund.
    Sec. 8104. Construction and Repair of Schools on Military 
Installations.--Retains and modifies a provision carried last 
year.
    Sec. 8105. Transfer of Detainees to or within the United 
States.--Retains a provision carried in previous years.
    Sec. 8106. Transfer of Detainees to a Foreign Country or 
Entity.--Retains a provision carried in previous years.
    Sec. 8107. Detainee Facilities.--Retains a provision 
carried in previous years.
    Sec. 8108. Corporations with Tax Liabilities.--Retains a 
provision carried last year.
    Sec. 8109. Corporations Convicted of Felonies.--Retains a 
provision carried last year.
    Sec. 8110. Procurement of RQ-4B Global Hawk and C-27J 
Spartan Aircraft.--Includes a new provision that requires the 
Secretary of the Air Force to obligate and expend funds 
previously appropriated for the procurement of RQ-4B Global 
Hawk and C-27J Spartan aircraft.
    Sec. 8111. USS ``Ted Stevens''.--Includes a new provision 
expressing the sense of the Senate regarding the naming of the 
next capital warship of the U.S. Navy.

                                TITLE IX

                    OVERSEAS CONTINGENCY OPERATIONS

                    Department of Defense--Military

    The Committee recommends an appropriation of 
$93,026,000,000 for operations related to Overseas Contingency 
Operations. In fiscal year 2012 Congress appropriated 
$114,965,635,000 for activities funded in this title.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table summarizes the Committee 
recommendation:

                                            [In thousands of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                 Fiscal year      Fiscal year       Committee
                                                                 2012 enacted    2013 estimate    recommendation
----------------------------------------------------------------------------------------------------------------
Military personnel...........................................       11,639,252       13,788,421       14,410,421
Operation and maintenance....................................       89,016,326       62,512,514       65,479,099
Procurement..................................................       13,633,461        7,911,841       10,126,300
Research, development, test and evaluation...................          526,358          245,516          260,413
Revolving and management funds...............................          435,013          503,364        1,467,864
Other Department of Defense programs.........................        4,137,785        3,249,089        2,987,803
General Provisions (net).....................................       -4,422,560  ...............       -1,705,900
                                                              --------------------------------------------------
      Total, Overseas Contingency Operations.................      114,965,635       88,210,745       93,026,000
----------------------------------------------------------------------------------------------------------------

                                OVERVIEW

                        COMMITTEE RECOMMENDATION

    The Committee recommends $93,026,000,000 of additional 
appropriations for Overseas Contingency Operations in fiscal 
year 2013. This funding will ensure that resources, equipment, 
and supplies are available for our servicemembers without 
interruption, and will enable the Department to avoid absorbing 
operational costs from within baseline programs that are 
critical to future readiness and home-station activities.

                         REPORTING REQUIREMENTS

    The Committee directs that the Department continue to 
report incremental contingency operations costs for Operation 
Enduring Freedom on a monthly basis in the Cost of War 
Execution report as required by Department of Defense Financial 
Management Regulation, chapter 23, volume 12. The Committee 
further directs the Department to continue providing the Cost 
of War reports to the congressional defense committees that 
include the following information by appropriation: funding 
appropriated, funding allocated, monthly obligations, monthly 
disbursements, cumulative fiscal year obligations, and 
cumulative fiscal year disbursements.
    The Committee expects that in order to meet unanticipated 
requirements, the Department of Defense may need to transfer 
funds within these appropriations accounts for purposes other 
than those specified in this report. The Committee directs the 
Department of Defense to follow normal prior approval 
reprogramming procedures should it be necessary to transfer 
funding between different appropriations accounts in this 
title.
    Organizational Clothing and Individual Equipment.--The 
Committee understands supplemental appropriations and overseas 
contingency operations funds have, for approximately 10 years, 
enabled considerable advancements in the quality and 
effectiveness of clothing and protective equipment, as well as 
advancements in the procedures for fielding such products. The 
Committee is concerned those advancements in technology and 
supply chain management for clothing and protective equipment 
could regress unless funding remains in place in future years. 
The Committee urges the Department of Defense to consider the 
long-term needs of the military departments for clothing and 
individual equipment and to maintain key elements of the Army 
Rapid Fielding Initiative, the Rapid Equipping Force and 
combatant command level purchasing authority to enable 
efficient and quick responses to future requirements.

                           MILITARY PERSONNEL

    The Committee recommends a total of $14,410,421,000 for 
pay, allowances, and other personnel costs for Active, Reserve, 
and Guard troops activated for duty in Afghanistan and other 
contingency operations. This recommendation includes funding 
for subsistence, permanent change of station travel, and 
special pays including imminent danger pay, family separation 
allowance, and hardship duty pay.

                        Military Personnel, Army

Appropriations, 2012....................................  $7,195,335,000
Budget estimate, 2013...................................   9,165,082,000
House allowance.........................................   9,263,779,000
Committee recommendation................................   9,790,082,000

    The Committee recommends an appropriation of 
$9,790,082,000. This is $625,000,000 above the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
      BA 1: PAY AND
       ALLOWANCES OF
       OFFICERS

    5 Basic Pay              1,569,045       1,751,045        +182,000
          Army          ..............  ..............        +182,000
           Requested
           Transfer
           from Title
           I: Basic
           Pay
           Enlisted
   10 Retired Pay              460,708         460,708  ..............
       Accrual
   25 Basic Allowance          463,305         463,305  ..............
       For Housing
   30 Basic Allowance           63,244          63,244  ..............
       For Subsistence
   35 Incentive Pays             4,660           4,660  ..............
   40 Special Pays              45,672          45,672  ..............
   45 Allowances                21,361          21,361  ..............
   50 Separation Pay             6,332           6,332  ..............
   55 Social Security          118,601         118,601  ..............
       Tax
                       -------------------------------------------------
            TOTAL            2,752,928       2,934,928        +182,000
                       =================================================
      BA 2: PAY AND
       ALLOWANCES OF
       ENLISTED
       PERSONNEL

   60 Basic Pay              2,414,145       2,832,145        +418,000
          Army          ..............  ..............        +418,000
           Requested
           Transfer
           from Title
           I: Basic
           Pay
           Enlisted
   65 Retired Pay              686,605         686,605  ..............
       Accrual
   80 Basic Allowance          943,334         943,334  ..............
       For Housing
   85 Incentive Pays             3,614           3,614  ..............
   90 Special Pays             224,329         224,329  ..............
   95 Allowances               131,845         131,845  ..............
  100 Separation Pay            20,915          20,915  ..............
  105 Social Security          183,570         183,570  ..............
       Tax
                       -------------------------------------------------
            TOTAL            4,608,357       5,026,357        +418,000
                       =================================================
      BA 4:
       SUBSISTENCE OF
       ENLISTED
       PERSONNEL

  115 Basic Allowance          287,016         287,016  ..............
       For Subsistence
  120 Subsistence-In-          862,270         887,270         +25,000
       Kind
          Army          ..............  ..............         +25,000
           Requested
           Transfer
           from Title
           I:
           Subsistence-
           In-Kind
                       -------------------------------------------------
            TOTAL            1,149,286       1,174,286         +25,000
                       =================================================
      BA 5: PERMANENT
       CHANGE OF
       STATION TRAVEL

  125 Accession Travel          16,933          16,933  ..............
  130 Training Travel           16,772          16,772  ..............
  135 Operational               90,749          90,749  ..............
       Travel
  140 Rotational                72,592          72,592  ..............
       Travel
  145 Separation                40,634          40,634  ..............
       Travel
  150 Travel of                  1,204           1,204  ..............
       Organized Units
                       -------------------------------------------------
            TOTAL              238,884         238,884  ..............
                       =================================================
      BA 6: OTHER
       MILITARY
       PERSONNEL COSTS

  175 Interest On                4,589           4,589  ..............
       Uniformed
       Services
       Savings
  180 Death Gratuities          10,800          10,800  ..............
  185 Unemployment             248,903         248,903  ..............
       Benefits
  212 Reserve Income               207             207  ..............
       Replacement
       Program
  216 SGLI Extra               113,317         113,317  ..............
       Hazard Payments
  219 Traumatic Injury          37,811          37,811  ..............
       Protection
       Coverage [T-
       SGLI]
                       -------------------------------------------------
            TOTAL              415,627         415,627  ..............
                       =================================================
            TOTAL--MIL       9,165,082       9,790,082        +625,000
             ITARY
             PERSONNEL
             , ARMY
------------------------------------------------------------------------

                        Military Personnel, Navy

Appropriations, 2012....................................  $1,259,234,000
Budget estimate, 2013...................................     874,625,000
House allowance.........................................     879,798,000
Committee recommendation................................     869,625,000

    The Committee recommends an appropriation of $869,625,000. 
This is $5,000,000 below the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
      BA 1: PAY AND
       ALLOWANCES OF
       OFFICERS

    5 Basic Pay                126,814         126,814  ..............
   10 Retired Pay               30,943          30,943  ..............
       Accrual
   25 Basic Allowance           40,210          40,210  ..............
       For Housing
   30 Basic Allowance            4,367           4,367  ..............
       For Subsistence
   35 Incentive Pays             3,886           3,886  ..............
   40 Special Pays              22,340          22,340  ..............
   45 Allowances                12,967          12,967  ..............
   50 Separation Pay                 9               9  ..............
   55 Social Security            9,701           9,701  ..............
       Tax
                       -------------------------------------------------
            TOTAL              251,237         251,237  ..............
                       =================================================
      BA 2: PAY AND
       ALLOWANCES OF
       ENLISTED
       PERSONNEL

   60 Basic Pay                162,655         162,655  ..............
   65 Retired Pay               39,688          39,688  ..............
       Accrual
   80 Basic Allowance           75,673          75,673  ..............
       For Housing
   85 Incentive Pays               566             566  ..............
   90 Special Pays              89,027          89,027  ..............
   95 Allowances                30,207          30,207  ..............
  100 Separation Pay               410             410  ..............
  105 Social Security           12,443          12,443  ..............
       Tax
                       -------------------------------------------------
            TOTAL              410,669         410,669  ..............
                       =================================================
      BA 4:
       SUBSISTENCE OF
       ENLISTED
       PERSONNEL

  115 Basic Allowance           19,223          19,223  ..............
       For Subsistence
  120 Subsistence-In-           25,647          25,647  ..............
       Kind
                       -------------------------------------------------
            TOTAL               44,870          44,870  ..............
                       =================================================
      BA 5: PERMANENT
       CHANGE OF
       STATION TRAVEL

  125 Accession Travel           4,092           4,092  ..............
  135 Operational               21,807          16,807          -5,000
       Travel
          Navy          ..............  ..............          -5,000
           Identified
           Excess to
           Requirement
  140 Rotational                27,897          27,897  ..............
       Travel
  145 Separation                 3,168           3,168  ..............
       Travel
                       -------------------------------------------------
            TOTAL               56,964          51,964          -5,000
                       =================================================
      BA 6: OTHER
       MILITARY
       PERSONNEL COSTS

  180 Death Gratuities             900             900  ..............
  185 Unemployment              55,522          55,522  ..............
       Benefits
  216 SGLI Extra                54,463          54,463  ..............
       Hazard Payments
                       -------------------------------------------------
            TOTAL              110,885         110,885  ..............
                       =================================================
            TOTAL--MIL         874,625         869,625          -5,000
             ITARY
             PERSONNEL
             , NAVY
------------------------------------------------------------------------

                    Military Personnel, Marine Corps

Appropriations, 2012....................................    $714,360,000
Budget estimate, 2013...................................   1,621,356,000
House allowance.........................................   1,640,838,000
Committee recommendation................................   1,623,356,000

    The Committee recommends an appropriation of 
$1,623,356,000. This is $2,000,000 above the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
      BA 1: PAY AND
       ALLOWANCES OF
       OFFICERS

    5 Basic Pay                206,978         206,978  ..............
   10 Retired Pay               61,932          61,932  ..............
       Accrual
   25 Basic Allowance           70,235          70,235  ..............
       For Housing
   30 Basic Allowance            8,590           8,590  ..............
       For Subsistence
   40 Special Pays               7,960           7,960  ..............
   45 Allowances                 5,099           5,099  ..............
   50 Separation Pay             1,896           1,896  ..............
   55 Social Security           15,834          15,834  ..............
       Tax
                       -------------------------------------------------
            TOTAL              378,524         378,524  ..............
                       =================================================
      BA 2: PAY AND
       ALLOWANCES OF
       ENLISTED
       PERSONNEL

   60 Basic Pay                542,667         542,667  ..............
   65 Retired Pay              166,183         166,183  ..............
       Accrual
   80 Basic Allowance          194,800         194,800  ..............
       For Housing
   90 Special Pays              56,287          56,287  ..............
   95 Allowances                22,729          22,729  ..............
  100 Separation Pay             4,004           4,004  ..............
  105 Social Security           41,514          41,514  ..............
       Tax
                       -------------------------------------------------
            TOTAL            1,028,184       1,028,184  ..............
                       =================================================
      BA 4:
       SUBSISTENCE OF
       ENLISTED
       PERSONNEL

  115 Basic Allowance           77,753          77,753  ..............
       For Subsistence
                       -------------------------------------------------
            TOTAL               77,753          77,753  ..............
                       =================================================
      BA 5: PERMANENT
       CHANGE OF
       STATION TRAVEL

  140 Rotational                51,816          51,816  ..............
       Travel
                       -------------------------------------------------
            TOTAL               51,816          51,816  ..............
                       =================================================
      BA 6: OTHER
       MILITARY
       PERSONNEL COSTS

  175 Interest on                  930             930  ..............
       Uniformed
       Services
       Savings
  180 Death Gratuities          12,000          12,000  ..............
  185 Unemployment              37,733          39,733          +2,000
       Benefits
          Marine Corps  ..............  ..............          +2,000
           Requested
           Transfer
           from
           Procurement
           , Marine
           Corps Line
           2 to Meet
           Identified
           Shortfall
  216 SGLI Extra                34,416          34,416  ..............
       Hazard Payments
                       -------------------------------------------------
            TOTAL               85,079          87,079          +2,000
                       =================================================
            TOTAL--MIL       1,621,356       1,623,356          +2,000
             ITARY
             PERSONNEL
             , MARINE
             CORPS
------------------------------------------------------------------------

                     Military Personnel, Air Force

Appropriations, 2012....................................  $1,492,381,000
Budget estimate, 2013...................................   1,286,783,000
House allowance.........................................   1,300,640,000
Committee recommendation................................   1,286,783,000

    The Committee recommends an appropriation of 
$1,286,783,000. This is equal to the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
      BA 1: PAY AND
       ALLOWANCES OF
       OFFICERS

    5 Basic Pay                220,573         220,573  ..............
   10 Retired Pay               53,829          53,829  ..............
       Accrual
   25 Basic Allowance           68,601          68,601  ..............
       For Housing
   30 Basic Allowance            7,873           7,873  ..............
       For Subsistence
   40 Special Pays              23,638          23,638  ..............
   45 Allowances                10,097          10,097  ..............
   55 Social Security           16,877          16,877  ..............
       Tax
                       -------------------------------------------------
            TOTAL              401,488         401,488  ..............
                       =================================================
      BA 2: PAY AND
       ALLOWANCES OF
       ENLISTED
       PERSONNEL

   60 Basic Pay                332,878         332,878  ..............
   65 Retired Pay               81,235          81,235  ..............
       Accrual
   80 Basic Allowance          145,832         145,832  ..............
       For Housing
   90 Special Pays              75,965          75,965  ..............
   95 Allowances                29,568          29,568  ..............
  105 Social Security           25,468          25,468  ..............
       Tax
                       -------------------------------------------------
            TOTAL              690,946         690,946  ..............
                       =================================================
      BA 4:
       SUBSISTENCE OF
       ENLISTED
       PERSONNEL

  115 Basic Allowance           36,263          36,263  ..............
       For Subsistence
  120 Subsistence-In-           60,537          60,537  ..............
       Kind
                       -------------------------------------------------
            TOTAL               96,800          96,800  ..............
                       =================================================
      BA 5: PERMANENT
       CHANGE OF
       STATION TRAVEL

  135 Operational                5,243           5,243  ..............
       Travel
                       -------------------------------------------------
            TOTAL                5,243           5,243  ..............
                       =================================================
      BA 6: OTHER
       MILITARY
       PERSONNEL COSTS

  180 Death Gratuities           2,000           2,000  ..............
  185 Unemployment              23,174          23,174  ..............
       Benefits
  216 SGLI Extra                67,132          67,132  ..............
       Hazard Payments
                       -------------------------------------------------
            TOTAL               92,306          92,306  ..............
                       =================================================
            TOTAL--MIL       1,286,783       1,286,783  ..............
             ITARY
             PERSONNEL
             , AIR
             FORCE
------------------------------------------------------------------------

                        Reserve Personnel, Army

Appropriations, 2012....................................    $207,162,000
Budget estimate, 2013...................................     156,893,000
House allowance.........................................     158,583,000
Committee recommendation................................     156,893,000

    The Committee recommends an appropriation of $156,893,000. 
This is equal to the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
      BA 1: UNIT AND
       INDIVIDUAL
       TRAINING

   10 Pay Group A               32,401          32,401  ..............
       Training (15
       Days & Drills
       24/48)
   70 School Training           15,365          15,365  ..............
   80 Special Training         109,127         109,127  ..............
                       -------------------------------------------------
            TOTAL              156,893         156,893  ..............
                       =================================================
            TOTAL,             156,893         156,893  ..............
             RESERVE
             PERSONNEL
             , ARMY
------------------------------------------------------------------------

                        Reserve Personnel, Navy

Appropriations, 2012....................................     $44,530,000
Budget estimate, 2013...................................      39,335,000
House allowance.........................................      39,759,000
Committee recommendation................................      39,335,000

    The Committee recommends an appropriation of $39,335,000. 
This is equal to the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
      BA 1: UNIT AND
       INDIVIDUAL
       TRAINING

   70 School Training            3,966           3,966  ..............
   80 Special Training          33,813          33,813  ..............
   90 Administration             1,556           1,556  ..............
       and Support
                       -------------------------------------------------
            TOTAL               39,335          39,335  ..............
                       =================================================
            TOTAL--RES          39,335          39,335  ..............
             ERVE
             PERSONNEL
             , NAVY
------------------------------------------------------------------------

                    Reserve Personnel, Marine Corps

Appropriations, 2012....................................     $25,421,000
Budget estimate, 2013...................................      24,722,000
House allowance.........................................      24,988,000
Committee recommendation................................      24,722,000

    The Committee recommends an appropriation of $24,722,000. 
This is equal to the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
      BA 1: UNIT AND
       INDIVIDUAL
       TRAINING

   70 School Training            4,437           4,437  ..............
   80 Special Training          19,912          19,912  ..............
   90 Administration               373             373  ..............
       and Support
                       -------------------------------------------------
            TOTAL               24,722          24,722  ..............
                       =================================================
            TOTAL--RES          24,722          24,722  ..............
             ERVE
             PERSONNEL
             , MARINE
             CORPS
------------------------------------------------------------------------

                      Reserve Personnel, Air Force

Appropriations, 2012....................................     $26,815,000
Budget estimate, 2013...................................      25,348,000
House allowance.........................................      25,621,000
Committee recommendation................................      25,348,000

    The Committee recommends an appropriation of $25,348,000. 
This is equal to the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
      BA 1: UNIT AND
       INDIVIDUAL
       TRAINING

   80 Special Training          25,348          25,348  ..............
                       -------------------------------------------------
            TOTAL               25,348          25,348  ..............
                       =================================================
            TOTAL--RES          25,348          25,348  ..............
             ERVE
             PERSONNEL
             , AIR
             FORCE
------------------------------------------------------------------------

                     National Guard Personnel, Army

Appropriations, 2012....................................    $664,579,000
Budget estimate, 2013...................................     583,804,000
House allowance.........................................     590,091,000
Committee recommendation................................     583,804,000

    The Committee recommends an appropriation of $583,804,000. 
This is equal to the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
      BA1: UNIT AND
       INDIVIDUAL
       TRAINING

   10 Pay Group A              132,368         132,368  ..............
       Training (15
       Days & Drills
       24/48)
   70 School Training           21,461          21,461  ..............
   80 Special Training         369,858         369,858  ..............
   90 Administration            60,117          60,117  ..............
       and Support
                       -------------------------------------------------
            TOTAL              583,804         583,804  ..............
                       =================================================
            TOTAL,             583,804         583,804  ..............
             NATIONAL
             GUARD
             PERSONNEL
             , ARMY
------------------------------------------------------------------------

                  National Guard Personnel, Air Force

Appropriations, 2012....................................      $9,435,000
Budget estimate, 2013...................................      10,473,000
House allowance.........................................      10,586,000
Committee recommendation................................      10,473,000

    The Committee recommends an appropriation of $10,473,000. 
This is equal to the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
      BA 1: UNIT AND
       INDIVIDUAL
       TRAINING

   80 Special Training          10,473          10,473  ..............
                       -------------------------------------------------
            TOTAL               10,473          10,473  ..............
                       =================================================
            TOTAL--NAT          10,473          10,473  ..............
             IONAL
             GUARD
             PERSONNEL
             , AIR
             FORCE
------------------------------------------------------------------------

                       OPERATION AND MAINTENANCE

    The Committee recommends $65,479,099,000 for the operation 
and maintenance accounts. These funds are available to fund 
overseas deployments and other activities by the services and 
Special Operations Forces to include financing flying hours, 
ship steaming days, ground operations, special airlift 
missions, increased ship and aircraft maintenance, logistics 
support, fuel purchases, base support, civilian personnel, 
personnel support costs, overseas transportation, 
communications support, facility management, and other 
operation and maintenance requirements.

                    Operation and Maintenance, Army

Appropriations, 2012.................................... $44,794,156,000
Budget estimate, 2013...................................  28,591,441,000
House allowance.........................................  26,682,437,000
Committee recommendation................................  30,578,256,000

    The Committee recommends an appropriation of 
$30,578,256,000. This is $1,986,815,000 above the budget 
estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
  114 Theater Level          2,758,162       2,758,162  ..............
       Assets
  115 Land Forces              991,396       1,133,193        +141,797
       Operations
       Support
          Transfer      ..............  ..............        +141,797
           from Title
           II: Combat
           Training
           Centers
  116 Aviation Assets           40,300         101,805         +61,505
          Transfer      ..............  ..............         +61,505
           from Title
           II: Theater
           Demand
           Reduction
  121 Force Readiness        1,755,445       2,015,334        +259,889
       Operations
       Support
          Decrease in   ..............  ..............         -40,000
           Contract
           Linguist
           Costs Not
           Properly
           Accounted
           for in
           Budget
           Justificati
           on
          Transfer      ..............  ..............         +71,660
           from Title
           II: Body
           Armor
           Sustainment
          Transfer      ..............  ..............        +228,229
           from Title
           II: Forward
           Operating
           Base--
           Kuwait
  122 Land Forces              307,244         307,244  ..............
       Systems
       Readiness
  123 Land Forces       ..............       1,134,602      +1,134,602
       Depot
       Maintenance
          Transfer      ..............  ..............        +150,483
           from Title
           II: Depot
           Maintenance
           -Aviation
          Transfer      ..............  ..............        +203,560
           from Title
           II: Depot
           Maintenance
           -Communicat
           ions
           Electronics
          Transfer      ..............  ..............        +102,707
           from Title
           II: Depot
           Maintenance
           -General
           Purpose
          Transfer      ..............  ..............        +161,174
           from Title
           II: Depot
           Maintenance
           -Missiles
          Transfer      ..............  ..............        +516,678
           from Title
           II: Depot
           Maintenance
           -Post
           Production
           Software
           Support
           [PPSS]
  131 Base Operations          393,165         593,165        +200,000
       Support
          Transfer      ..............  ..............        +200,000
           from Title
           II:
           Overseas
           Security
           Guards
  132 Facilities,              250,000         250,000  ..............
       Sustainment,
       Restoration,
       and
       Modernization
  135 Additional            12,524,137      12,954,159        +430,022
       Activities
          Task Force    ..............  ..............         -10,000
           for
           Stability
           Operations:
           Operations/
           Sustainment
           Request
          ARGUS A-160   ..............  ..............         -48,400
           Cancellatio
           n
          Transfer      ..............  ..............         +48,000
           from JIEDDO
           Line 1:
           Falcon
          Transfer      ..............  ..............        +217,376
           from Title
           II SAG 111:
           Combined
           Arms
           Training
           Strategy
          Transfer      ..............  ..............        +148,194
           from Title
           II SAG 111:
           Theater
           Demand
           Reduction
          Transfer      ..............  ..............         +74,852
           from Title
           II SAG 113:
           Combined
           Arms
           Training
           Strategy
  136 Commander's              400,000         200,000        -200,000
       Emergency
       Response
       Program
          CERP-Reduced  ..............  ..............        -200,000
           Operational
           Need
  137 Reset                  3,687,973       3,687,973  ..............
  411 Security               1,828,717       1,805,717         -23,000
       Programs
          Classified    ..............  ..............         -23,000
           Adjustment
  421 Servicewide            3,238,310       3,238,310  ..............
       Transportation
  422 Central Supply           129,000         129,000  ..............
       Activities
  424 Ammunition                78,022          78,022  ..............
       Management
  432 Servicewide       ..............          22,000         +22,000
       Communications
          Transfer      ..............  ..............         +22,000
           from JIEDDO
           Line 1:
           Biometrics
           ID Funding
           to be used
           for
           Biometrics
           Identity
           Management
           Agency
           [BIMA]
  434 Other Personnel          137,277          97,277         -40,000
       Support
          Army-         ..............  ..............         -40,000
           Requested
           Transfer to
           Other
           Procurement
           , Army Line
           61: Fiber
           Optic Cable
  435 Other Service             72,293          72,293  ..............
       Support
                       -------------------------------------------------
            Total,          28,591,441      30,578,256      +1,986,815
             Operation
             and
             Maintenan
             ce, Army
------------------------------------------------------------------------

    Commanders Emergency Response Program.--The Committee 
recommends $200,000,000 for the Commanders Emergency Response 
Program [CERP] in Afghanistan in fiscal year 2013, the amount 
recommended in S. 3254, the National Defense Authorization Act 
for Fiscal Year 2013, as reported.
    The Committee directs the Army to submit monthly 
commitment, obligation, and expenditure data for CERP to the 
congressional defense committees no later than 30 days after 
each month.
    CERP Projects.--The Committee includes language in the 
Commander's Emergency Response Program [CERP] general provision 
that requires all projects executed under this authority shall 
be small scale, and shall not exceed $20,000,000 in cost 
(including any ancillary or related elements in connection with 
such project).
    Task Force for Business and Stability Operations [TFBSO].--
The fiscal year 2013 budget request for the Task Force for 
Business and Stability Operations is $93,000,000 for projects 
and $76,000,000 for its operations and administration. This 
year's budget request for projects has decreased from the 
fiscal year 2012 request of $150,000,000, while the operations 
and administration budget has remained steady. Therefore, the 
Committee recommends a reduction of $10,000,000 for TFBSO 
operations and administration to reflect the decline in project 
funding.
    The Committee understands the unique nature of the programs 
and initiatives offered by TFBSO. The Committee is concerned 
with the lack of clear strategic goals and direction on past 
projects and the lack of TFBSO oversight on the contracts 
developed in support of its own efforts. The Committee is 
encouraged with new leadership within the organization that has 
committed to carefully evaluate current and future projects and 
contracts but remains concerned that a lack of proper oversight 
could lead to mismanagement of taxpayer funds. Therefore, the 
Committee directs the TFBSO to work with the Office of the 
Under Secretary of Defense for Acquisition, Technology, and 
Logistics to ensure contracts meet the standards and quality 
required by Department of Defense regulations. In addition, the 
Committee directs the Task Force to provide a report to the 
congressional defense committees not later than 90 days after 
enactment of this act on all current and planned programs and 
initiatives funded by TFBSO and the deliverables to be achieved 
under these projects. Additionally, the Committee directs the 
TFBSO to provide a quarterly report to the congressional 
defense committees on all current and future TFBSO initiated 
projects to include timelines for project completion and for 
obligations and expenditures of each project.

                    Operation and Maintenance, Navy

Appropriations, 2012....................................  $7,674,026,000
Budget estimate, 2013...................................   5,880,395,000
House allowance.........................................   5,880,395,000
Committee recommendation................................   6,968,812,000

    The Committee recommends an appropriation of 
$6,968,812,000. This is $1,088,417,000 above the budget 
estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
 1A1A Mission and              937,098       1,118,043        +180,945
       Other Flight
       Operations
          Transfer      ..............  ..............        +180,945
           from Title
           II: Flying
           Hours
 1A3A Aviation                   1,000           1,000  ..............
       Technical Data
       and Engineering
       Services
 1A4A Air Operations            15,794          15,794  ..............
       and Safety
       Support
 1A4N Air Systems               19,013          19,013  ..............
       Support
 1A5A Aircraft Depot           201,912         201,912  ..............
       Maintenance
 1A6A Aviation Depot             3,000           3,000  ..............
       Operations
       Support
 1A9A Aviation                  44,150          44,150  ..............
       Logistics
 1B1B Mission and              463,738         968,558        +504,820
       Other Ship
       Operations
          Transfer      ..............  ..............        +504,820
           from Title
           II: Ship
           Consumables
           , Repair
           Parts,
           Fuel,
           Administrat
           ion
 1B2B Ship Operations           24,774          24,774  ..............
       Support and
       Training
 1B4B Ship Depot             1,310,010       1,310,010  ..............
       Maintenance
 1C1C Combat                    42,965          42,965  ..............
       Communications
 1C4C Warfare Tactics           25,970          25,970  ..............
 1C5C Operational               19,226          19,226  ..............
       Meteorology and
       Oceanography
 1C6C Combat Support         1,668,359       2,124,160        +455,801
       Forces
          Unjustified   ..............  ..............         -30,000
           Growth for
           C4I and
           Other
           Services
           and
           Miscellaneo
           us
           Contracts
          Navy-         ..............  ..............        +219,000
           Identified
           Shortfalls
           for
           CENTCOM:
           Increased
           Carrier
           Presence
          Navy-         ..............  ..............         +56,000
           Identified
           Shortfalls
           for
           CENTCOM:
           ISR
          Navy-         ..............  ..............         +18,000
           Identified
           Shortfalls
           for
           CENTCOM:
           Mine
           Countermeas
           ure Ships
          Transfer      ..............  ..............        +192,801
           from Title
           II: Naval
           Expeditiona
           ry Combat
           Command
           Increases
 1C7C Equipment                  7,954           7,954  ..............
       Maintenance
 1D3D In-Service                94,655          64,655         -30,000
       Weapons Systems
       Support
          Unjustified   ..............  ..............         -30,000
           Growth for
           Other
           Supplies
           and
           Equipment
 1D4D Weapons                  303,087         303,087  ..............
       Maintenance
 BSM1 Facilities                 3,218          22,391         +19,173
       Sustainment,
       Restoration,
       and
       Modernization
          Transfer      ..............  ..............         +19,173
           from Title
           II: Camp
           Lemonnier,
           Djibouti
 BSS1 Base Operating           143,442         316,717        +173,275
       Support
          Transfer      ..............  ..............        +173,275
           from Title
           II: Camp
           Lemonnier,
           Djibouti
 2C1H Expeditionary             31,395          34,883          +3,488
       Health Service
       Systems
          Transfer      ..............  ..............          +3,488
           from Title
           II: Camp
           Lemonnier,
           Djibouti
 2C3H Coast Guard              254,461  ..............        -254,461
       Support
          Transfer to   ..............  ..............        -254,461
           Department
           of Homeland
           Security
 3B1K Specialized               50,903          50,903  ..............
       Skill Training
 4A1M Administration             1,377           1,377  ..............
 4A2M External                     487             487  ..............
       Relations
 4A4M Military                   6,022          34,533         +28,511
       Manpower and
       Personnel
       Management
          Transfer      ..............  ..............         +28,511
           from Title
           II: Camp
           Lemonnier,
           Djibouti
 4A5M Other Personnel            3,514           3,514  ..............
       Support
 4B1N Servicewide              184,864         184,864  ..............
       Transportation
 4B3N Acquisition and            2,026           8,891          +6,865
       Program
       Management
          Transfer      ..............  ..............          +6,865
           from Title
           II: Camp
           Lemonnier,
           Djibouti
 9999 Classified                15,981          15,981  ..............
       Programs
                       -------------------------------------------------
            Total,           5,880,395       6,968,812      +1,088,417
             Operation
             and
             Maintenan
             ce, Navy
------------------------------------------------------------------------

                Operation and Maintenance, Marine Corps

Appropriations, 2012....................................  $3,935,210,000
Budget estimate, 2013...................................   4,066,340,000
House allowance.........................................   4,566,340,000
Committee recommendation................................   4,108,340,000

    The Committee recommends an appropriation of 
$4,108,340,000. This is $42,000,000 above the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
 1A1A Operational            1,921,258       1,851,258         -70,000
       Forces
          Unjustified   ..............  ..............         -20,000
           Growth for
           Reserve
           Component
           Activation/
           Deactivatio
           n
          Unjustified   ..............  ..............         -50,000
           Growth for
           OPTEMPO
 1A2A Field Logistics        1,094,028       1,094,028  ..............
 1A3A Depot                    222,824         334,824        +112,000
       Maintenance
          Transfer      ..............  ..............        +112,000
           from Title
           II: Depot
           Maintenance
 BSS1 Base Operating            88,690          88,690  ..............
       Support
 3B4D Training Support         215,212         215,212  ..............
 4A3G Servicewide              512,627         512,627  ..............
       Transportation
 4A4G Administration            11,701          11,701  ..............
                       -------------------------------------------------
            Total,           4,066,340       4,108,340         +42,000
             Operation
             and
             Maintenan
             ce,
             Marine
             Corps
------------------------------------------------------------------------

                  Operation and Maintenance, Air Force

Appropriations, 2012.................................... $10,879,347,000
Budget estimate, 2013...................................   9,241,613,000
House allowance.........................................   9,136,236,000
Committee recommendation................................   9,291,493,000

    The Committee recommends an appropriation of 
$9,291,493,000. This is $49,880,000 above the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
 011A Primary Combat         1,494,144       1,564,144         +70,000
       Forces
          Transfer      ..............  ..............         +70,000
           from Title
           II: Theater
           Security
           Package
 011C Combat                   809,531         809,531  ..............
       Enhancement
       Forces
 011D Air Operations            13,095          81,375         +68,280
       Training
          Transfer      ..............  ..............         +68,280
           from Title
           II: Flag
           Exercises
 011M Depot                  1,403,238       1,403,238  ..............
       Maintenance
 011R Facilities               155,954         105,954         -50,000
       Sustainment,
       Restoration,
       and
       Modernization
          Unjustified   ..............  ..............         -50,000
           Growth in
           FSRM
           Projects
 011Z Base Operating           342,226         342,226  ..............
       Support
 012A Global C3I and            15,108          15,108  ..............
       Early Warning
 012C Other Combat Ops         271,390         271,390  ..............
       Spt Programs
 012F Tactical                  25,400          25,400  ..............
       Intelligence
       and Special
       Activities
 013C Space Control              5,110           5,110  ..............
       Systems
 015A Combatant                 52,173          52,173  ..............
       Commanders
       Direct Mission
       Support
 021A Airlift                3,187,211       3,187,211  ..............
       Operations
 021D Mobilization              43,509          43,509  ..............
       Preparedness
 021M Depot                    554,943         554,943  ..............
       Maintenance
 021R Facilities                 4,431           4,431  ..............
       Sustainment,
       Restoration,
       and
       Modernization
 021Z Base Support               9,256           9,256  ..............
 031R Facilities                   424             424  ..............
       Sustainment,
       Restoration,
       and
       Modernization
 031Z Base Support               1,036           1,036  ..............
 032A Specialized               10,923          10,923  ..............
       Skill Training
 032B Flight Training               72              72  ..............
 032C Professional                 323             323  ..............
       Development
       Education
 032D Training Support             352             352  ..............
 041A Logistics                100,429         100,429  ..............
       Operations
 041R Facilities                47,200          47,200  ..............
       Sustainment,
       Restoration,
       and
       Modernization
 041Z Base Support               7,242           7,242  ..............
 042A Administration             1,552           1,552  ..............
 042B Servicewide               82,094          82,094  ..............
       Communications
 042G Other                    582,977         537,977         -45,000
       Servicewide
       Activities
          Unjustified   ..............  ..............         -45,000
           Growth for
           the Defense
           Finance and
           Accounting
           Services
           [DFAS] Bill
 043A Security                  20,270          26,870          +6,600
       Programs
          Classified    ..............  ..............          +6,600
           Adjustment
                       -------------------------------------------------
            Total,           9,241,613       9,291,493         +49,880
             Operation
             and
             Maintenan
             ce, Air
             Force
------------------------------------------------------------------------

                Operation and Maintenance, Defense-Wide

Appropriations, 2012....................................  $9,252,211,000
Budget estimate, 2013...................................   7,824,579,000
House allowance.........................................   7,790,579,000
Committee recommendation................................   8,274,052,000

    The Committee recommends an appropriation of 
$8,274,052,000. This is $449,473,000 above the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
      Joint Chiefs of            2,000           2,000  ..............
       Staff
      Special                2,503,060       2,946,233        +443,173
       Operations
       Command
          Transfer      ..............  ..............        +443,173
           from Title
           II: SOCOM-
           Identified
           Costs Moved
           into the
           Base Budget
           in Fiscal
           Year 2013
           Previously
           Funded in
           OCO
      Defense Contract          30,674          30,674  ..............
       Audit Agency
      Defense Contract          69,803          69,803  ..............
       Management
       Agency
      Defense Human              3,334           3,334  ..............
       Resource
       Activity
      Defense                  152,925         152,925  ..............
       Information
       Systems Agency
      Defense Legal            102,322         102,322  ..............
       Services Agency
      Defense Media             10,823          10,823  ..............
       Activity
      Department of            139,830         159,830         +20,000
       Defense
       Education
       Activity
          Beyond        ..............  ..............         +20,000
           Yellow
           Ribbon
           Programs
      Defense Security       2,200,000       2,200,000  ..............
       Cooperation
       Agency
      Office of the             87,805          74,105         -13,700
       Secretary of
       Defense
          Civilian      ..............  ..............          -1,500
           Expeditiona
           ry
           Workforce
          Project       ..............  ..............         -12,200
           Archer
      Classified             2,522,003       2,522,003  ..............
       Programs
                       -------------------------------------------------
            Total,           7,824,579       8,274,052        +449,473
             Operation
             and
             Maintenan
             ce,
             Defense-
             Wide
------------------------------------------------------------------------

    Northern Distribution Network [NDN].--The Committee directs 
the Secretary of Defense to submit a report to the 
congressional defense committees not later than 90 days after 
enactment of this act on all projects and initiatives 
associated with the Northern Distribution Network support 
activities, to include multimodal access points. The report 
should include detailed cost estimates and a spend plan for 
each project and timelines for project execution and 
completion.
    Beyond Yellow Ribbon Programs.--The Committee provides an 
additional $20,000,000 for the Yellow Ribbon Reintegration 
Program Office under the Defense Human Resource Activity and is 
directed to use the funds for National Guard and Reserve 
outreach and reintegration programs, National Guard and Reserve 
employment enhancement programs and peer-to-peer hotline 
services for mental health and suicide prevention initiatives. 
For the peer-to-peer hotline services, the Committee encourages 
continued coordination between the Defense Human Resource 
Activity, the National Guard Bureau and the Assistant Secretary 
of Defense for Reserve Affairs.

                Operation and Maintenance, Army Reserve

Appropriations, 2012....................................    $217,500,000
Budget estimate, 2013...................................     154,537,000
House allowance.........................................     157,887,000
Committee recommendation................................     154,537,000

    The Committee recommends an appropriation of $154,537,000. 
This is equal to the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
  113 Echelons Above            78,600          78,600  ..............
       Brigade
  115 Land Force                20,811          20,811  ..............
       Operations
       Support
  121 Force Readiness           20,726          20,726  ..............
       Operations
       Support
  131 Base Operations           34,400          34,400  ..............
       Support
                       -------------------------------------------------
            Total,             154,537         154,537  ..............
             Operation
             and
             Maintenan
             ce, Army
             Reserve
------------------------------------------------------------------------

                Operation and Maintenance, Navy Reserve

Appropriations, 2012....................................     $74,148,000
Budget estimate, 2013...................................      55,924,000
House allowance.........................................      55,924,000
Committee recommendation................................      55,924,000

    The Committee recommends an appropriation of $55,924,000. 
This is equal to the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
 1A1A Mission and               24,834          24,834  ..............
       Other Flight
       Operations
 1A3A Intermediate                 300             300  ..............
       Maintenance
 1A5A Aircraft Depot            13,364          13,364  ..............
       Maintenance
 1B1B Mission and                8,213           8,213  ..............
       Other Ship
       Operations
 1B4B Ship Depot                   929             929  ..............
       Maintenance
 1C6C Combat Support             8,244           8,244  ..............
       Forces
 BSSR Base Operating                40              40  ..............
       Support
                       -------------------------------------------------
            Total,              55,924          55,924  ..............
             Operation
             and
             Maintenan
             ce, Navy
             Reserve
------------------------------------------------------------------------

            Operation and Maintenance, Marine Corps Reserve

Appropriations, 2012....................................     $36,084,000
Budget estimate, 2013...................................      25,477,000
House allowance.........................................      25,477,000
Committee recommendation................................      25,477,000

    The Committee recommends an appropriation of $25,477,000. 
This is equal to the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
 1A1A Operating Forces          22,657          22,657  ..............
 BSS1 Base Operating             2,820           2,820  ..............
       Support
                       -------------------------------------------------
            Total,              25,477          25,477  ..............
             Operation
             and
             Maintenan
             ce,
             Marine
             Corps
             Reserve
------------------------------------------------------------------------

              Operation and Maintenance, Air Force Reserve

Appropriations, 2012....................................    $142,050,000
Budget estimate, 2013...................................     120,618,000
House allowance.........................................     120,618,000
Committee recommendation................................     120,618,000

    The Committee recommends an appropriation of $120,618,000. 
This is equal to the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
 011A Primary Combat             7,600           7,600  ..............
       Forces
 011M Depot                    106,768         106,768  ..............
       Maintenance
 011Z Base Support               6,250           6,250  ..............
                       -------------------------------------------------
            Total,             120,618         120,618  ..............
             Operation
             and
             Maintenan
             ce, Air
             Force
             Reserve
------------------------------------------------------------------------

             Operation and Maintenance, Army National Guard

Appropriations, 2012....................................    $377,544,000
Budget estimate, 2013...................................     382,448,000
House allowance.........................................     392,448,000
Committee recommendation................................     382,448,000

    The Committee recommends an appropriation of $382,448,000. 
This is equal to the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
  111 Maneuver Units            38,485          38,485  ..............
  112 Modular Support            1,959           1,959  ..............
       Brigades
  113 Echelons Above            20,076          20,076  ..............
       Brigade
  114 Theater Level              2,028           2,028  ..............
       Assets
  116 Aviation Assets          183,811         183,811  ..............
  121 Force Readiness           43,780          43,780  ..............
       Operations
       Support
  131 Base Operations           70,237          70,237  ..............
       Support
  133 Management and            20,072          20,072  ..............
       Operational
       Headquarters
  432 Servicewide                2,000           2,000  ..............
       Communication
                       -------------------------------------------------
            Total,             382,448         382,448  ..............
             Operation
             and
             Maintenan
             ce, Army
             National
             Guard
------------------------------------------------------------------------

             Operation and Maintenance, Air National Guard

Appropriations, 2012....................................     $34,050,000
Budget estimate, 2013...................................      19,975,000
House allowance.........................................      34,500,000
Committee recommendation................................      19,975,000

    The Committee recommends an appropriation of $19,975,000. 
This is equal to the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
 011G Mission Support           19,975          19,975  ..............
       Operations
                       -------------------------------------------------
            Total,              19,975          19,975  ..............
             Operation
             and
             Maintenan
             ce, Air
             National
             Guard
------------------------------------------------------------------------

                    Afghanistan Infrastructure Fund

Appropriations, 2012....................................    $400,000,000
Budget estimate, 2013...................................     400,000,000
House allowance.........................................     200,000,000
Committee recommendation................................     350,000,000

    The Committee recommends an appropriation of $350,000,000. 
This is $50,000,000 below the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
      Power                    100,000         100,000  ..............
      Water                    300,000         300,000  ..............
                       -------------------------------------------------
            Subtotal,          400,000         400,000  ..............
             Afghanist
             an
             Infrastru
             cture
             Fund
                       =================================================
                Author  ..............         -50,000         -50,000
                 izati
                 on
                 Adjus
                 tment
                       -------------------------------------------------
                  Tota         400,000         350,000         -50,000
                   l,
                   Afg
                   han
                   ist
                   an
                   Inf
                   ras
                   tru
                   ctu
                   re
                   Fun
                   d
------------------------------------------------------------------------

    Afghanistan Infrastructure Fund.--The fiscal year 2013 
budget request includes $400,000,000 for the Afghanistan 
Infrastructure Fund [AIF]. The Committee notes the large 
unobligated balances of prior year AIF funding and recommends a 
reduction of $50,000,000 to the fiscal year 2013 request. While 
supportive of the goals of AIF, the Committee is concerned with 
the long term sustainability of large scale infrastructure 
projects, many of which may still be underway long after United 
States forces have withdrawn from Afghanistan in 2014. 
Therefore, the Committee directs the Secretary of Defense to 
submit a report to the congressional defense committees not 
later than 90 days after enactment of this act on the long term 
sustainability costs of current and future AIF projects and the 
plan to cover any cost growth above those estimated in the 
budget submission.

                    Afghanistan Security Forces Fund

Appropriations, 2012.................................... $11,200,000,000
Budget estimate, 2013...................................   5,749,167,000
House allowance.........................................   4,592,213,000
Committee recommendation................................   5,149,167,000

    The Committee recommends an appropriation of 
$5,149,167,000. This is $600,000,000 below the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
      Infrastructure           190,000          90,000        -100,000
      Equipment and            241,521         241,521  ..............
       Transportation
      Training and             758,380         758,380  ..............
       Operations
      Sustainment            2,523,825       2,523,825  ..............
                       -------------------------------------------------
            Subtotal,        3,713,726       3,613,726        -100,000
             Ministry
             of
             Defense
                       =================================================
      Infrastructure            50,000          50,000  ..............
      Equipment and             84,859          84,859  ..............
       Transportation
      Training and             569,868         569,868  ..............
       Operations
      Sustainment            1,305,950       1,305,950  ..............
                       -------------------------------------------------
            Subtotal,        2,010,677       2,010,677  ..............
             Ministry
             of
             Interior
                       =================================================
      Infrastructure             1,200           1,200  ..............
      Equipment and              1,239           1,239  ..............
       Transportation
      Training and               4,000           4,000  ..............
       Operations
      Sustainment               18,325          18,325  ..............
                       -------------------------------------------------
            Subtotal,           24,764          24,764  ..............
             Related
             Activitie
             s
                       =================================================
          Reduction     ..............        -500,000        -500,000
           due to
           prior year
           unobligated
           balances
                       -------------------------------------------------
            Total,           5,749,167       5,149,167        -600,000
             Afghanist
             an
             Security
             Forces
             Fund
------------------------------------------------------------------------

    Afghanistan Security Forces Fund [ASFF].--The President's 
budget request includes $5,749,167,000 for the Afghanistan 
Security Forces Fund for fiscal year 2013, a nearly 50-percent 
decrease from the fiscal year 2012 appropriated amount of 
$11,200,000,000. The Department of Defense [DOD] reprogrammed 
$1,000,000,000 of unobligated ASFF funding from fiscal year 
2011. U.S. Central Command informed the Committee that the 
fiscal year 2012 spending estimate would be revised downward by 
$2,800,000,000 and that the Department intended to reprogram a 
portion of these excess funds. Therefore, the Committee 
recommends a rescission of $1,000,000,000 from the fiscal year 
2012 Afghanistan Security Forces Fund and a reduction of 
$600,000,000 in fiscal year 2013 ASFF.

                              PROCUREMENT

    The Committee recommends $10,126,300,000 for the 
procurement accounts. The Overseas Contingency Operations 
funding supports our forces engaged in Operation Enduring 
Freedom and other contingency operations. The Committee 
provides funding to replace combat losses and equipment left 
behind in theater, augment and upgrade equipment for deploying 
units, sustain munitions and other war consumables, and reset 
the units returning home to an equipment-ready status. Funding 
adjustments have been made in instances where the requirement 
was poorly defined, funding was requested ahead of need or 
program execution has been delayed.

                       Aircraft Procurement, Army

Appropriations, 2012....................................  $1,137,381,000
Budget estimate, 2013...................................     486,200,000
House allowance.........................................     541,600,000
Committee recommendation................................   1,140,294,000

    The Committee recommends an appropriation of 
$1,140,294,000. This is $654,094,000 above the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
    3 MQ-1 UAV          ..............         414,088        +414,088
          Transfer      ..............  ..............        +414,088
           from Title
           III
    4 RQ-11 [RAVEN]     ..............          25,798         +25,798
          Transfer      ..............  ..............         +25,798
           from Title
           III
    9 AH-64 Apache              71,000         142,000         +71,000
       Block IIIB New
       Build
          Two Apache    ..............  ..............         +71,000
           battle loss
           replacement
           s
   12 Kiowa Warrior            183,900         105,900         -78,000
       [OH-58F] WRA
          Maintain      ..............  ..............         -78,000
           fiscal year
           2012 WRA
           rate
   13 UH-60 Blackhawk   ..............          36,600          36,600
       M Model [MYP]
          Army          ..............  ..............         +36,600
           requested
           transfer
           from PAA
           Line 7
           Title III
           and IX for
           Battle loss
           replacement
           s
   15 CH-47 Helicopter         231,300         231,300  ..............
   18 MQ-1 Payload--    ..............         184,608        +184,608
       UAS
          Transfer      ..............  ..............        +184,608
           from Title
           III
                       -------------------------------------------------
            Total,             486,200       1,140,294         654,094
             Aircraft
             Procureme
             nt, Army
------------------------------------------------------------------------

                       Missile Procurement, Army

Appropriations, 2012....................................    $126,556,000
Budget estimate, 2013...................................      49,653,000
House allowance.........................................      49,653,000
Committee recommendation................................      67,951,000

    The Committee recommends an appropriation of $67,951,000. 
This is $18,298,000 above the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
    4 Hellfire Sys              29,100          48,700          19,600
       Summary
          Army          ..............  ..............         +19,600
           Identified
           Shortfall
           For
           Additional
           Missiles
    8 Guided MLRS               20,553          19,251          -1,302
       Rocket [GMLRS]
          Unit Cost     ..............  ..............          -1,302
           Efficiencie
           s
                       -------------------------------------------------
            Total,              49,653          67,951         +18,298
             Missile
             Procureme
             nt, Army
------------------------------------------------------------------------

        Procurement of Weapons and Tracked Combat Vehicles, Army

Appropriations, 2012....................................     $37,117,000
Budget estimate, 2013...................................      15,422,000
House allowance.........................................      15,422,000
Committee recommendation................................      15,422,000

    The Committee recommends an appropriation of $15,422,000. 
This is equal to the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
   36 M16 Rifle Mods            15,422          15,422  ..............
                       -------------------------------------------------
            Total,              15,422          15,422  ..............
             Procureme
             nt of
             WTCV,
             Army
------------------------------------------------------------------------

                    Procurement of Ammunition, Army

Appropriations, 2012....................................    $208,381,000
Budget estimate, 2013...................................     357,493,000
House allowance.........................................     338,493,000
Committee recommendation................................     326,193,000

    The Committee recommends an appropriation of $326,193,000. 
This is $31,300,000 below the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
    3 Ctg, Handgun,              1,500           1,500  ..............
       All Types
    4 Ctg, .50 Cal,             10,000          10,000  ..............
       All Types
    7 Ctg, 30mm, All            80,000          61,000         -19,000
       Types
          Army          ..............  ..............         -18,600
           requested
           transfer to
           Title IX
           Aircraft
           Procurement
           , Army Line
           13
          Excess to     ..............  ..............            -400
           requirement
    9 60mm Mortar, All          14,000          14,000  ..............
       Types
   10 81mm Mortar, All           6,000           6,000  ..............
       Types
   11 120mm Mortar,             56,000          56,000  ..............
       All Types
   13 Artillery                 29,956          29,956  ..............
       Cartridges,
       75MM and 105MM,
       All Types
   14 Artillery                 37,044          37,044  ..............
       Projectile,
       155MM, All
       Types
   15 Proj 155mm                12,300  ..............         -12,300
       Extended Range
       Xm982
              Contract  ..............  ..............         -12,300
               award
               delays
   16 Artillery                 17,000          17,000  ..............
       Propellants,
       Fuzes, and
       Primers, All
       Types
   17 Mines and                 12,000          12,000  ..............
       Clearing
       Charges, All
       Types
   20 Rocket, Hydra             63,635          63,635  ..............
       70, All Types
   23 Signals, All              16,858          16,858  ..............
       Types
   28 Items Less Than            1,200           1,200  ..............
       $5,000,000
                       -------------------------------------------------
            TOTAL              357,493         326,193         -31,300
------------------------------------------------------------------------

                        Other Procurement, Army

Appropriations, 2012....................................  $1,334,345,000
Budget estimate, 2013...................................   2,015,907,000
House allowance.........................................   2,005,907,000
Committee recommendation................................   2,284,190,000

    The Committee recommends an appropriation of 
$2,284,190,000. This is $268,283,000 above the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
    2 Family of Medium          28,247          28,247  ..............
       Tactical
       Vehicles [FMTV]
    4 Family of Heavy            2,050           2,050  ..............
       Tactical
       Vehicles [FHTV]
   11 HMMWV                    271,000         171,000        -100,000
       Recapitalizatio
       n Program
          Excess to     ..............  ..............        -100,000
           need
   14 Mine-Resistant           927,400         721,400        -206,000
       Ambush-
       Protected
       [MRAP] Mods
          Federal       ..............  ..............        -106,000
           Roads
           Excise Tax
          Excess to     ..............  ..............        -100,000
           need
   52 Reserve CA/MISO            8,000           8,000  ..............
       GPF Equipment
   61 Installation              25,000          40,000         +15,000
       Info
       Infrastructure
       Mod Program
          Army          ..............  ..............         +40,000
           requested
           transfer
           from
           Operation
           and
           Maintenance
           , Army,
           line 434--
           fiber optic
           line
          Excess to     ..............  ..............         -25,000
           need
   69 DCGS-A [MIP]              90,355         274,362        +184,007
          Transfer      ..............  ..............        +184,007
           from Title
           III--DCGS-A
   73 CI Humint Auto             6,516           6,516  ..............
       Reprinting and
       Collection
   75 Lightweight               27,646          27,646  ..............
       Counter Mortar
       Radar
   77 Family of                 52,000          27,000         -25,000
       Persistent
       Surveillance
       Capabilities
          Delayed       ..............  ..............         -25,000
           spares
           contract
           awards
   78 Counterintellige         205,209         152,459         -52,750
       nce/Security
       Countermeasures
          Prior year    ..............  ..............         -42,000
           funds
           available
          LEMV          ..............  ..............         -10,750
           Sensors--la
           te to need
   83 Night Vision      ..............          27,000         +27,000
       Devices
          Transfer      ..............  ..............         +27,000
           from Title
           III--Night
           Vision
           Devices
   92 Mod of In-Svc             14,600          14,600  ..............
       Equip
       (Firefinder
       Radars)
   99 Counterfire               54,585         298,994        +244,409
       Radars
          Transfer      ..............  ..............        +244,409
           from Title
           III--Counte
           rfire
           Radars
  102 Fire Support C2           22,430          22,430  ..............
       Family
  103 Battle Command             2,400           2,400  ..............
       Sustainment
       Support System
  111 Network           ..............          44,921         +44,921
       Management
       Initialization
       and Service
          Transfer      ..............  ..............         +44,921
           from Title
           III--Networ
           k
           Management
           Initializat
           ion and
           Service
  112 Maneuver Control           6,400           6,400  ..............
       System [MCS]
  113 Single Army                5,160           5,160  ..............
       Logistics
       Enterprise
       [SALE]
  126 Family of Non-            15,000          15,000  ..............
       Lethal
       Equipment
       [FNLE]
  127 Base Defense              66,100          66,100  ..............
       Systems [BDS]
  134 Robotic Combat    ..............          29,106         +29,106
       Support System
       [RCSS]
          Transfer      ..............  ..............         +29,106
           from Title
           III--Roboti
           c Combat
           Support
           System
           [RCSS]
  135 Explosive                  3,565           3,565  ..............
       Ordnance
       Disposal Eqpmt
       [EOD EQPMT]
  138 Heaters and       ..............          12,210         +12,210
       ECU'S
          Transfer      ..............  ..............         +12,210
           from Title
           III--Heater
           s and ECUs
  143 Force Provider            39,700          39,700  ..............
  145 Cargo Aerial Del             650             650  ..............
       and Personnel
       Parachute
       System
  149 Distribution               2,119           2,119  ..............
       Systems,
       Petroleum and
       Water
  152 Mobile                       428             428  ..............
       Maintenance
       Equipment
       Systems
  153 Items Less Than               30              30  ..............
       $5 Million
       (MAINT EQ)
  171 Generators and    ..............          60,302         +60,302
       Associated
       Equipment
          Transfer      ..............  ..............         +60,302
           from Title
           III--Genera
           tors and
           Associated
           Equipment
  175 Combat Training            7,000           7,000  ..............
       Centers Support
  176 Training                  27,250          27,250  ..............
       Devices,
       Nonsystem
  178 Aviation                   1,000           1,000  ..............
       Combined Arms
       Tactical
       Trainer
  179 Gaming                     5,900           5,900  ..............
       Technology In
       Support of Army
       Training
  183 Rapid Equipping           98,167         133,245         +35,078
       Soldier Support
       Equipment
          Transfer      ..............  ..............          +5,078
           from Title
           III--Rapid
           Equipping
           Soldier
           Support
           Equipment
          Authorizatio  ..............  ..............         +30,000
           n increase
           for Solar
           power units
                       -------------------------------------------------
            Total,           2,015,907       2,284,190        +268,283
             Other
             Procureme
             nt, Army
------------------------------------------------------------------------

                       Aircraft Procurement, Navy

Appropriations, 2012....................................    $480,935,000
Budget estimate, 2013...................................     164,582,000
House allowance.........................................     146,277,000
Committee recommendation................................     426,436,000

    The Committee recommends an appropriation of $426,436,000. 
This is $261,854,000 above the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
   11 H-1 Upgrades [UH-         29,800          55,400         +25,600
       1Y/AH-1Z]
          Replace       ..............  ..............         +25,600
           operational
           loss
   23 KC-130J           ..............          72,021         +72,021
          Transfer      ..............  ..............         +40,892
           from Title
           III
           Procurement
           , Marine
           Corps line
           5--one KC-
           130J
          Transfer      ..............  ..............         +31,129
           from Title
           IX
           Procurement
           , Marine
           Corps line
           5--one KC-
           130J
   30 AV-8 Series               42,238          39,638          -2,600
          Litening Pod  ..............  ..............          -2,600
           Other
           Support
           cost growth
   32 F-18 Series               41,243          41,243  ..............
   35 H-53 Series               15,870          15,870  ..............
   38 EP-3 Series               13,030          13,030  ..............
   43 C-130 Series              16,737          16,737  ..............
   45 Cargo/Transport   ..............          10,000         +10,000
       A/C Series
          Transfer      ..............  ..............         +10,000
           from Title
           III--Cargo/
           Transport
           Aircraft
           Series
   48 Special Project            2,714          15,135         +12,421
       Aircraft
          Transfer      ..............  ..............         +12,421
           from Title
           III--Specia
           l Project
           Aircraft
   53 Common ECM        ..............          32,855         +32,855
       Equipment
          Transfer      ..............  ..............         +32,855
           from Title
           III--Direct
           ed Infrared
           Countermeas
           ures
   54 Common Avionics              570             570  ..............
       Changes
   55 Common Defensive  ..............          18,850         +18,850
       Weapon System
          Transfer      ..............  ..............         +18,850
           from Title
           III--Blue
           Force
           Situational
            Awareness
   59 RQ-7 Series       ..............          49,324         +49,324
          Transfer      ..............  ..............         +49,324
           from Title
           III--Retrof
           its
   62 Common Ground              2,380           2,380  ..............
       Equipment
   64 War Consumables   ..............          43,383         +43,383
          Transfer      ..............  ..............         +43,383
           from Title
           III--War
           Consumables
                       -------------------------------------------------
            Total,             164,582         426,436        +261,854
             Aircraft
             Procureme
             nt, Navy
------------------------------------------------------------------------

                       Weapons Procurement, Navy

Appropriations, 2012....................................     $41,070,000
Budget estimate, 2013...................................      23,500,000
House allowance.........................................      22,500,000
Committee recommendation................................      23,500,000

    The Committee recommends an appropriation of $23,500,000. 
This is equal to the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
    9 Hellfire                  17,000          17,000  ..............
   10 Stand off                  6,500           6,500  ..............
       Precision
       Guided
       Munitions
       [SOPGM]
                       -------------------------------------------------
            Total,              23,500          23,500  ..............
             Weapons
             Procureme
             nt, Navy
------------------------------------------------------------------------

            Procurement of Ammunition, Navy and Marine Corps

Appropriations, 2012....................................    $317,100,000
Budget estimate, 2013...................................     285,747,000
House allowance.........................................     284,450,000
Committee recommendation................................     284,356,000

    The Committee recommends an appropriation of $284,356,000. 
This is $1,391,000 below the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
    1 General Purpose           18,000          18,000  ..............
       Bombs
    2 Airborne                  80,200          80,200  ..............
       Rockets, All
       Types
    3 Machine Gun               21,500          21,500  ..............
       Ammunition
    6 Air Expendable            20,303          20,303  ..............
       Countermeasures
   11 Other Ship Gun               532             532  ..............
       Ammunition
   12 Small Arms and             2,643           2,643  ..............
       Landing Party
       Ammo
   13 Pyrotechnic and            2,322           2,322  ..............
       Demolition
   14 Ammunition Less            6,308           6,308  ..............
       Than $5,000,000
   15 Small Arms                10,948          10,948  ..............
       Ammunition
   16 Linear Charges,            9,940           9,940  ..............
       All Types
   17 40mm, All Types            5,963           5,963  ..............
   20 120mm, All Types          11,605          11,605  ..............
   21 Ctg 25mm, All              2,831           2,831  ..............
       Types
   22 Grenades, All              2,359           2,359  ..............
       Types
   23 Rockets, All               3,051           3,051  ..............
       Types
   24 Artillery, All            54,886          54,886  ..............
       Types
   25 Demolition                 1,391  ..............          -1,391
       Munitions, All
       Types
          Prior year    ..............  ..............          -1,391
           funds
           available
   26 Fuze, All Types           30,945          30,945  ..............
   27 Non Lethals                    8               8  ..............
   29 Items Less Than               12              12  ..............
       $5,000,000
                       -------------------------------------------------
            TOTAL              285,747         284,356          -1,391
------------------------------------------------------------------------

                        Other Procurement, Navy

Appropriations, 2012....................................    $236,125,000
Budget estimate, 2013...................................      98,882,000
House allowance.........................................      98,882,000
Committee recommendation................................      98,882,000

    The Committee recommends an appropriation of $98,882,000. 
This is equal to the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
   70 Tactical/Mobile            3,603           3,603  ..............
       C4I Systems
   97 Expeditionary             58,200          58,200  ..............
       Airfields
  127 Passenger                  3,901           3,901  ..............
       Carrying
       Vehicles
  128 General Purpose              852             852  ..............
       Trucks
  129 Construction and           2,436           2,436  ..............
       Maintenance
       Equipment
  130 Fire-fighting              3,798           3,798  ..............
       Equipment
  131 Tactical                  13,394          13,394  ..............
       Vehicles
  134 Items Under                  375             375  ..............
       $5,000,000
  149 C4ISR Equipment            3,000           3,000  ..............
  151 Physical                   9,323           9,323  ..............
       Security
       Equipment
                       -------------------------------------------------
            TOTAL,              98,882          98,882  ..............
             OTHER
             PROCURMEN
             T, NAVY
------------------------------------------------------------------------

                       Procurement, Marine Corps

Appropriations, 2012....................................  $1,233,996,000
Budget estimate, 2013...................................     943,683,000
House allowance.........................................     943,683,000
Committee recommendation................................     865,977,000

    The Committee recommends an appropriation of $865,977,000. 
This is $77,706,000 below the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
    2 LAV PIP                   10,000          10,000  ..............
    5 High Mobility            108,860          77,731         -31,129
       Artillery
       Rocket System
          Marine Corps  ..............  ..............         -31,129
           Requested
           Transfer to
           Title IX:
           Aircraft
           Procurement
           , Navy
    6 Weapons and       ..............          11,124         +11,124
       combat vehicles
       under
       $5,000,000
          Transfer      ..............  ..............         +11,124
           from Title
           III
   10 Javelin                   29,158          28,384            -774
          Unit Cost     ..............  ..............            -774
           Efficiencie
           s
   13 Modification              41,602          41,602  ..............
       Kits
   15 Repair and Test           13,632          13,632  ..............
       Equipment
   17 Modification               2,831           2,831  ..............
       Kits
   19 Air Operations            15,575          15,575  ..............
       C2 Systems
   20 Radar Systems              8,015           8,015  ..............
   23 Intelligence              35,310          35,310  ..............
       Support
       Equipment
   29 Night Vision                 652             652  ..............
       Equipment
   30 Common Computer           19,807          19,807  ..............
       Resources
   32 Radio Systems             36,482          36,482  ..............
   33 Comm Switching            41,295          41,295  ..............
       and Control
       Systems
   39 Medium Tactical           10,466          10,466  ..............
       Vehicle
       Replacement
   40 Logistics         ..............           3,300          +3,300
       Vehicle System
       Rep
          Transfer      ..............  ..............          +3,300
           from Title
           III
   41 Family of                  7,642           7,642  ..............
       Tactical
       Trailers
   45 Bulk Liquid               18,239          18,239  ..............
       Equipment
   46 Tactical Fuel             51,359          51,359  ..............
       Systems
   47 Power Equipment           20,247          50,020         +29,773
       Assorted
          APSCE and     ..............  ..............         +29,773
           MEPDIS-R
           Transfer
           from Title
           III
   49 EOD Systems              362,658         272,658         -90,000
          JCREW 3.3     ..............  ..............         -90,000
           Contract
           Award Delay
   50 Physical                  55,500          55,500  ..............
       Security
       Equipment
   52 Material                  19,100          19,100  ..............
       Handling
       Equipment
   54 Field Medical             15,751          15,751  ..............
       Equipment
   55 Training Devices           3,602           3,602  ..............
   57 Family of                 15,900          15,900  ..............
       Construction
       Equipment
                       -------------------------------------------------
            Total,             943,683         865,977         -77,706
             Procureme
             nt Marine
             Corps
------------------------------------------------------------------------

                    Aircraft Procurement, Air Force

Appropriations, 2012....................................  $1,235,777,000
Budget estimate, 2013...................................     305,600,000
House allowance.........................................     305,600,000
Committee recommendation................................     395,327,000

    The Committee recommends an appropriation of $395,327,000. 
This is $89,727,000 above the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
   35 Large Aircraft           139,800         139,800  ..............
       Infrared
       Countermeasures
   55 U-2 Mods                  46,800          46,800  ..............
   63 C-130                     11,400          11,400  ..............
   67 Compass Call              14,000          14,000  ..............
       Mods
   68 RC-135                     8,000           8,000  ..............
   75 HC/MC-130                  4,700           4,700  ..............
       Modifications
   81 Initial Spares/           21,900          21,900  ..............
       Repair Parts
   98 War consumables   ..............          89,727         +89,727
          Transfer      ..............  ..............         +89,727
           from Title
           III
   99 Other Production          59,000          59,000  ..............
       Charges
                       -------------------------------------------------
            Total,             305,600         395,327         +89,727
             Aircraft
             Procureme
             nt, Air
             Force
------------------------------------------------------------------------

                     Missile Procurement, Air Force

Appropriations, 2012....................................     $41,220,000
Budget estimate, 2013...................................      34,350,000
House allowance.........................................      34,350,000
Committee recommendation................................      34,350,000

    The Committee recommends an appropriation of $34,350,000. 
This is equal to the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
    5 Predator                  34,350          34,350  ..............
       Hellfire
       Missile
                       -------------------------------------------------
            Total,              34,350          34,350  ..............
             Missile
             Procureme
             nt, Air
             Force
------------------------------------------------------------------------

                  Procurement of Ammunition, Air Force

Appropriations, 2012....................................    $109,010,000
Budget estimate, 2013...................................     116,203,000
House allowance.........................................     116,203,000
Committee recommendation................................     116,203,000

    The Committee recommends an appropriation of $116,203,000. 
This is equal to the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
    2 Cartridges                13,592          13,592  ..............
    4 General Purpose           23,211          23,211  ..............
       Bombs
    5 Joint Direct              53,923          53,923  ..............
       Attack Munition
    6 Cad/Pad                    2,638           2,638  ..............
   10 Items Less Than            2,600           2,600  ..............
       $5,000,000
   11 Flares                    11,726          11,726  ..............
   12 Fuzes                      8,513           8,513  ..............
                       -------------------------------------------------
            TOTAL              116,203         116,203  ..............
------------------------------------------------------------------------

                      Other Procurement, Air Force

Appropriations, 2012....................................  $3,088,510,000
Budget estimate, 2013...................................   2,818,270,000
House allowance.........................................   2,785,170,000
Committee recommendation................................   2,684,470,000

    The Committee recommends an appropriation of 
$2,684,470,000. This is $133,800,000 below the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
    2 Medium Tactical            2,010           2,010  ..............
       Vehicle
    4 Items Less Than            2,675           2,675  ..............
       $5 Million
    6 Items Less Than            2,557           2,557  ..............
       $5 Million
    8 Items Less Than            4,329           4,329  ..............
       $5 Million
    9 Runway Snow                  984             984  ..............
       Removal and
       Cleaning Equ
   10 Items Less Than            9,120           9,120  ..............
       $5 Million
   22 Weather                    5,600           5,600  ..............
       Observation
       Forecast
   27 General                   11,157          11,157  ..............
       Information
       Technology
   49 Tactical C-E               7,000           7,000  ..............
       Equipment
   53 Base Comm                 10,654          10,654  ..............
       Infrastructure
   54 Comm Elect Mods            8,000           8,000  ..............
   55 Night Vision                 902             902  ..............
       Goggles
   59 Contingency               60,090          43,190         -16,900
       Operations
          JCREW LRIP    ..............  ..............         -16,900
           Delay
   62 Mobility                   9,400           9,400  ..............
       Equipment
   63 Items Less Than            9,175           9,175  ..............
       $5 Million
      Classified             2,672,317       2,555,417        -116,900
       Programs
          Classified    ..............  ..............        -116,900
           Adjustment
   71 Spares and                 2,300           2,300  ..............
       Repair Parts
                       -------------------------------------------------
            TOTAL,           2,818,270       2,684,470        -133,800
             OTHER
             PROCUREME
             NT, AIR
             FORCE
------------------------------------------------------------------------

                       Procurement, Defense-Wide

Appropriations, 2012....................................    $405,768,000
Budget estimate, 2013...................................     196,349,000
House allowance.........................................     217,849,000
Committee recommendation................................     362,749,000

    The Committee recommends an appropriation of $362,749,000. 
This is $166,400,000 above the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
   15 Teleport Program           5,260           5,260  ..............
   51 U-28              ..............          46,600         +46,600
          SOCOM         ..............  ..............         +46,600
           identified
           shortfall
           for U-28 HD
           FMV
   55 MQ-1 Unmanned     ..............          23,000         +23,000
       Aerial Vehicle
          SOCOM         ..............  ..............         +23,000
           identified
           shortfall
           for MQ-1 HD
           FMV
   56 MQ-9 Unmanned     ..............          59,400         +59,400
       Aerial Vehicle
          MQ-9 battle   ..............  ..............         +24,000
           loss
           replacement
           s
          SOCOM         ..............  ..............         +35,400
           identified
           shortfall
           for MQ-9 HD
           FMV
   61 MQ-8 UAV                  16,500          16,500  ..............
   68 Communications               151           4,051          +3,900
       Equipment and
       Electronics
          SOCOM         ..............  ..............          +3,900
           identified
           shortfall
           for HD FMV
           (Com Equip
           and
           electronics
           )
   69 Intelligence              30,528          30,528  ..............
       Systems
   71 Distributed       ..............           3,200          +3,200
       Common Ground/
       Surface Systems
          SOCOM         ..............  ..............          +3,200
           identified
           shortfall
           for DCGS--
           HD FMV
   77 Tactical                   1,843           1,843  ..............
       Vehicles
   78 Mission Training  ..............           5,000          +5,000
       and Preparation
       Systems
          SOCOM         ..............  ..............          +5,000
           identified
           shortfall
           for HD FMV
           (Training
           and Prep
           systems)
   82 Automation                 1,000           1,000  ..............
       Systems
   86 Visual                       108             108  ..............
       Augmentation
       Lasers and
       Sensor Systems
   91 Operational               14,758          40,058         +25,300
       Enhancements
          SOCOM         ..............  ..............         +25,300
           identified
           shortfall
           for HD FMV
           (SOF
           Operational
           enhancement
           s)
      Classified               126,201         126,201  ..............
       Programs
                       -------------------------------------------------
            TOTAL,             196,349         362,749        +166,400
             PROCUREME
             NT
             DEFENSE-
             WIDE
------------------------------------------------------------------------

                  National Guard and Reserve Equipment

Appropriations, 2012....................................  $1,000,000,000
Budget estimate, 2013...................................................
House allowance.........................................................
Committee recommendation................................   1,000,000,000

    The Committee recommends an appropriation of 
$1,000,000,000. This is $1,000,000,000 above the budget 
estimate.
    The appropriation includes direction for each Reserve and 
National Guard component commander to submit to the 
congressional defense committees a detailed assessment of that 
component's modernization priorities, not later than 30 days 
after enactment of this act.

                     committee recommended program

    The following table summarizes the budget estimate for this 
appropriation, the Committee recommendation, and the Committee 
recommended adjustments to the budget estimate:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
Line         Item           2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
       NATIONAL GUARD
        AND RESERVE
         EQUIPMENT

     RESERVE EQUIPMENT

     ARMY RESERVE:
         Miscellaneous  ..............         160,000        +160,000
          Equipment
     NAVY RESERVE:
         Miscellaneous  ..............         100,000        +100,000
          Equipment
     MARINE CORPS
      RESERVE:
         Miscellaneous  ..............         100,000        +100,000
          Equipment
     AIR FORCE
      RESERVE:
         Miscellaneous  ..............         100,000        +100,000
          Equipment
                       -------------------------------------------------
           TOTAL,       ..............         460,000        +460,000
            RESERVE
            EQUIPMENT
                       =================================================
       NATIONAL GUARD
         EQUIPMENT

     ARMY NATIONAL
      GUARD:
         Miscellaneous  ..............         300,000        +300,000
          Equipment
     AIR NATIONAL
      GUARD:
         Miscellaneous  ..............         240,000        +240,000
          Equipment
                       -------------------------------------------------
           TOTAL,       ..............         540,000        +540,000
            NATIONAL
            GUARD
            EQUIPMENT
                       =================================================
           TOTAL,       ..............       1,000,000      +1,000,000
            NATIONAL
            GUARD AND
            RESERVE
            EQUIPMENT
------------------------------------------------------------------------

    Unobligated Balances.--The Committee remains concerned 
about the obligation rates for the Navy Reserve, Marine Corps 
Reserve, and Air Force Reserve and urges these components to 
improve management of this account.
    High-Priority Items.--The Committee directs that the 
National Guard and Reserve Equipment Account shall be executed 
by the Chiefs of the National Guard and Reserve components with 
priority consideration given to the following items: A-10 
Situation Awareness Upgrade; ARC 210 Radios for ANG F-16s; 
Arctic Search and Rescue Package; Armory-Based Individual and 
Unstabilized Gunnery Trainers; Batteries and Battery Support 
Equipment; Bradley Modifications; C-130 Crash-Resistant 
Loadmaster Seat; C-130 Secure Line-of-Sight [SLOS] Beyond Line-
of-Sight [BLOS] Capability; C-130/KC-135 Real Time Information 
in Cockpit [RTIC] Data Link; CH-47 Door Gun Mounts; Combat 
Mobility Equipment; Combined Arms Virtual Trainers; F-15 AESA 
Radars; Field Engineering, Logistics, Maintenance, and Security 
Equipment; Force Protection Equipment; Generation 4 Advanced 
Targeting Pods; HC-130 Forward Area Refueling Point; Helicopter 
Firefighting Equipment; Helmet-Mounted Cueing System; HMMWV 
Recapitalization; In-Flight Propeller Balancing System; 
Internal and External Auxiliary Fuel Tanks for Apaches and 
Chinooks; Joint Threat Emitters; Large Aircraft Infrared 
Countermeasures [LAIRCM]; Light Utility Helicopters; Modular 
Airborne Firefighting System II; Modular Small Arms Training 
Systems; MRAP Vehicle Virtual Trainers; Naval Construction 
Force Tactical Vehicles and Support Equipment; Reactive Skin 
Decontamination Lotion; SATCOM Ground Stations; Simulation 
Training Systems; Support Wide Area Network [SWAN] D V3/MRT 
Packages; Targeting Pod Upgrades; Thermal Imaging Systems; 
Ultra-Light Tactical Vehicles; Unit Maintenance Aerial Recovery 
Kits; Virtual Convoy Operations Trainers; and Virtual Door 
Gunner Trainers.

               RESEARCH, DEVELOPMENT, TEST AND EVALUATION

    The Committee recommends $260,413,000 for research, 
development, test and evaluation.

            Research, Development, Test and Evaluation, Army

Appropriations, 2012....................................     $18,513,000
Budget estimate, 2013...................................      19,860,000
House allowance.........................................      14,860,000
Committee recommendation................................      42,357,000

    The Committee recommends an appropriation of $42,357,000. 
This is $22,497,000 above the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
   60 Soldier Support           19,860           9,860         -10,000
       and
       Survivability
      Program           ..............  ..............         -10,000
       adjustment
   78 Endurance UAVs    ..............          20,197         +20,197
          Transfer      ..............  ..............         +20,197
           from Title
           IV: LEMV
           Military
           Utility
           Assessment
           in theater
   79 Aircraft          ..............          12,300         +12,300
       Avionics
          Transfer      ..............  ..............         +12,300
           from Title
           IV: DVE ONS
                       -------------------------------------------------
            Total,              19,860          42,357         +22,497
             Research,
             Developme
             nt, Test
             and
             Evaluatio
             n, Army
------------------------------------------------------------------------

            Research, Development, Test and Evaluation, Navy

Appropriations, 2012....................................     $53,884,000
Budget estimate, 2013...................................      60,119,000
House allowance.........................................      60,119,000
Committee recommendation................................      52,519,000

    The Committee recommends an appropriation of $52,519,000. 
This is $7,600,000 below the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
   56 Joint Service              4,600           4,600  ..............
       Explosive
       Ordnance
       Development
  131 Medical                    2,173           2,173  ..............
       Development
  160 Navy Space and             5,200           5,200  ..............
       Electronic
       Warfare [SEW]
       Support
  195 Marine Corps               6,762           6,762  ..............
       Combat Services
       Support
  221 RQ-7 UAV                   7,600  ..............          -7,600
          Undefined     ..............  ..............          -7,600
           weapons
           capability
      Classified                33,784          33,784  ..............
       programs
                       -------------------------------------------------
            Total,              60,119          52,519          -7,600
             Research,
             Developme
             nt, Test
             and
             Evaluatio
             n, Navy
------------------------------------------------------------------------

         Research, Development, Test and Evaluation, Air Force

Appropriations, 2012....................................    $259,600,000
Budget estimate, 2013...................................      53,150,000
House allowance.........................................      53,150,000
Committee recommendation................................      53,150,000

    The Committee recommends an appropriation of $53,150,000. 
This is equal to the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
      Classified                53,150          53,150  ..............
       programs
                       -------------------------------------------------
            Total,              53,150          53,150  ..............
             Research,
             Developme
             nt, Test
             and
             Evaluatio
             n, Air
             Force
------------------------------------------------------------------------

        Research, Development, Test and Evaluation, Defense-Wide

Appropriations, 2012....................................    $194,361,000
Budget estimate, 2013...................................     112,387,000
House allowance.........................................     107,387,000
Committee recommendation................................     112,387,000

    The Committee recommends an appropriation of $112,387,000. 
This is equal to the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
  239 MQ-8 UAV                   5,000           5,000  ..............
      Classified               107,387         107,387  ..............
       programs
                       -------------------------------------------------
            Total,             112,387         112,387  ..............
             Research,
             Developme
             nt, Test
             and
             Evaluatio
             n,
             Defense-
             Wide
------------------------------------------------------------------------

                     REVOLVING AND MANAGEMENT FUNDS


                     Defense Working Capital Funds

Appropriations, 2012....................................    $435,013,000
Budget estimate, 2013...................................     503,364,000
House allowance.........................................     293,600,000
Committee recommendation................................   1,467,864,000

    The Committee recommends an appropriation of 
$1,467,864,000. This is $964,500,000 above the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the programs recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
      Prepositioned             42,600          42,600  ..............
       War Reserve
       Stocks
                       -------------------------------------------------
            Total,              42,600          42,600  ..............
             Defense
             Working
             Capital
             Fund,
             Army
                       =================================================
      C-17 CLS Engine          230,400         230,400  ..............
       Repair
      Transportation            10,000          10,000  ..............
       Fallen Heroes
                       -------------------------------------------------
            Total,             240,400         240,400  ..............
             Defense
             Working
             Capital
             Fund, Air
             Force
                       =================================================
      Defense                  220,364       1,184,864        +964,500
       Logistics
       Agency
          Mitigation    ..............  ..............        +964,500
           of
           Projected
           Fiscal Year
           2013
           Shortfall
           for Fuel
           and Second
           Destination
           Transportat
           ion
                       -------------------------------------------------
            Total,             220,364       1,184,864        +964,500
             Defense
             Working
             Capital
             Fund,
             Defense-
             wide
                       =================================================
            Grand              503,364       1,467,864        +964,500
             Total,
             Defense
             Working
             Capital
             Funds
------------------------------------------------------------------------

                  OTHER DEPARTMENT OF DEFENSE PROGRAMS


                         Defense Health Program

Appropriations, 2012....................................  $1,228,288,000
Budget estimate, 2013...................................     993,898,000
House allowance.........................................   1,003,898,000
Committee recommendation................................     993,898,000

    The Committee recommends an appropriation of $993,898,000. 
This is equal to the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
      OPERATION AND            993,898         993,898  ..............
       MAINTENANCE
          IN-HOUSE             483,326         483,326  ..............
           CARE
          PRIVATE              376,982         376,982  ..............
           SECTOR CARE
          CONSOLIDATED         111,675         111,675  ..............
           HEALTH CARE
          INFORMATION            4,773           4,773  ..............
           MANAGEMENT/
           IT
          MANAGEMENT               660             660  ..............
           HEADQUARTER
           S
          EDUCATION             15,370          15,370  ..............
           AND
           TRAINING
          BASE                   1,112           1,112  ..............
           OPERATIONS
           AND
           COMMUNICATI
           ONS
------------------------------------------------------------------------

         Drug Interdiction and Counter-Drug Activities, Defense

Appropriations, 2012....................................    $456,458,000
Budget estimate, 2013...................................     469,025,000
House allowance.........................................     469,025,000
Committee recommendation................................     469,025,000

    The Committee recommends an appropriation of $469,025,000. 
This is equal to the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
  010 Drug                     469,025         469,025  ..............
       Interdiction
       and Counter-
       Drug
       Activities,
       Defense
                       -------------------------------------------------
            TOTAL,             469,025         469,025  ..............
             DRUG
             INTERDICT
             ION AND
             COUNTER-D
             RUG
             ACTIVITIE
             S,
             DEFENSE
------------------------------------------------------------------------

             Joint Improvised Explosive Device Defeat Fund

Appropriations, 2012....................................  $2,441,984,000
Budget estimate, 2013...................................   1,675,400,000
House allowance.........................................   1,614,900,000
Committee recommendation................................   1,514,114,000

    The Committee recommends an appropriation of 
$1,514,114,000. This is $161,286,000 below the budget estimate.

                     COMMITTEE RECOMMENDED PROGRAM

    The following table details the program recommended by the 
Committee:

                        [In thousands of dollars]
------------------------------------------------------------------------
                                                            Change from
 Line         Item          2013 budget      Committee        budget
                             estimate     recommendation     estimate
------------------------------------------------------------------------
    1 ATTACK THE               950,500         784,500        -166,000
       NETWORK
          Biometric     ..............  ..............         -22,000
           ID--Transfe
           r to
           Operation
           and
           Maintenance
           Army line
           432
          Integrated    ..............  ..............         -23,000
           supply
           chain--dupl
           ication of
           mission
          Falcon--Tran  ..............  ..............         -48,000
           sfer to
           Operation
           and
           Maintenance
           Army line
           135
          Sand Dragon-- ..............  ..............         -40,000
           excess
           sustainment
           funds and
           program
           delays
          TEDAC--exces  ..............  ..............         -33,000
           s prior
           year
           carryover
           funding
    2 DEFEAT THE               400,000         307,800         -92,200
       DEVICE
          ALARM--exces  ..............  ..............          -4,700
           s to need
          3-Band Long   ..............  ..............          -2,000
           Wave
           infrared
           camera
           early to
           need
          Remote        ..............  ..............         -85,500
           Mounted
           Detection
           System--JIE
           DDO
           discontinue
           d efforts
    3 TRAIN THE FORCE          149,500         119,000         -30,500
          Intelligence  ..............  ..............         -28,500
           surveillanc
           e and
           reconnaissa
           nce
           emulation
           and trainer
           early to
           need
          Dismounted    ..............  ..............          -2,000
           Virtual
           Simulators-
           -undefined
           unit cost
           increase
    4 STAFF AND                175,400         302,814        +127,414
       INFRASTRUCTURE
          Transfer      ..............  ..............        +227,414
           from Title
           VI: Staff
           and
           Infrastruct
           ure
          Forward       ..............  ..............        -100,000
           financed
           from
           previous
           years
                       -------------------------------------------------
            Total,           1,675,400       1,514,114        -161,286
             JIEDDO
------------------------------------------------------------------------

    Joint Improvised Explosive Device Defeat Organization.--The 
Joint Improvised Explosive Device Defeat Organization [JIEDDO] 
continues to support a vital mission in protecting our troops 
from improvised explosive devices. The fiscal year 2013 budget 
includes $227,414,000 for base funding, which the Committee 
recommends transferring to title IX as these requirements are 
war-related and should be funded through Overseas Contingency 
Operations [OCO] funding. The fiscal year 2013 request also 
includes $1,675,400,000 in OCO funds.
    The Committee directs the Deputy Secretary of Defense to 
submit to the congressional defense committees a quarterly 
commitment, obligation, and expenditure data by line of 
operation, by year of appropriation, and by program. The 
Committee also directs JIEDDO to follow standard Department of 
Defense reprogramming procedures when transferring a cumulative 
amount of $20,000,000 or 10 percent whichever is lesser between 
programs. In addition, all Staff and Infrastructure costs 
should follow DOD Operation and Maintenance fiscal standards.
    In addition, a February 2012 Government Accountability 
Office report states that ``DOD continues to lack comprehensive 
visibility of its counter-IED expenditures and investments, 
including those from JIEDDO, the military services, and 
relevant DOD agencies''. Therefore, the Committee directs 
JIEDDO to incorporate the fiscal year 2012-2016 JIEDDO 
strategic plan into a technology roadmap with measurable 
outcome-oriented goals. This technology roadmap is due to the 
Committee 180 days after enactment of this act.
    Furthermore, JIEDDO has carried large amounts of funding 
forward from year to year. For example, over $900,000,000 
appropriated in fiscal year 2011 was carried forward into 
fiscal year 2012 for obligation. In fiscal year 2012, JIEDDO 
will carry over $500,000,000 into fiscal year 2013. The 
Committee is also aware that JIEDDO found alternative solutions 
to $87,500,000 in planned efforts. Therefore, the Committee 
recommends a reduction of $231,200,000 to the fiscal year 2013 
request. In addition, the Committee transfers $70,000,000 to 
the appropriate services for execution. The Committee also 
concurs with the Senate Armed Services Committee recommendation 
to transfer the Counter-IED Operations Integration Center to 
the appropriate entities no later than the end of fiscal year 
2013.
    Finally, JIEDDO is consolidating nearly one-half a million 
square feet of office space in the National Capital Region. The 
Committee directs the Deputy Secretary of Defense to conduct a 
business case analysis before executing the requested 
$20,800,000 of fiscal year 2013 facilities funding.

                  Joint Urgent Operational Needs Fund

Appropriations, 2012....................................................
Budget estimate, 2013...................................    $100,000,000
House allowance.........................................................
Committee recommendation................................................

    The Committee recommends no funding for the Joint Urgent 
Operational Needs Fund.

                    Office of the Inspector General

Appropriations, 2012....................................     $11,055,000
Budget estimate, 2013...................................      10,766,000
House allowance.........................................      10,766,000
Committee recommendation................................      10,766,000

    The Committee recommends an appropriation of $10,766,000. 
This is equal to the budget estimate.

                     GENERAL PROVISIONS--THIS TITLE

    Sec. 9001. Provides that funds made available in this title 
are in addition to amounts appropriated or made available for 
the Department of Defense for fiscal year 2013.
    Sec. 9002. Provides special transfer authority of up to 
$4,000,000,000 of funds in this title, subject to the terms and 
conditions in this act.
    Sec. 9003. Provides the authority to obligate supervision 
and administration costs associated with overseas construction 
projects at the time the project is awarded.
    Sec. 9004. Provides for the procurement of motor vehicles 
for use by military and civilian employees of the Department of 
Defense in Iraq and Afghanistan.
    Sec. 9005. Provides authority of up to $200,000,000 of 
funds in this title to fund the Commander's Emergency Response 
Program.
    Sec. 9006. Provides for the use of funds to lift and 
sustain coalition forces supporting military and stability 
operations in Iraq and Afghanistan and requires quarterly 
reports to the congressional defense committees.
    Sec. 9007. Prohibits the use of funds made available in 
this act to establish any permanent military installation or 
base in Iraq or Afghanistan.
    Sec. 9008. Prohibits the use of funds in this act to 
contravene laws enacted or regulations promulgated to implement 
the United Nations Convention Against Torture and Other Cruel, 
Inhuman or Degrading Treatment or Punishment.
    Sec. 9009. Requires the Afghanistan Resource Oversight 
Council to oversee several programs in Afghanistan.
    Sec. 9010. Provides a Combatant Commander engaged in 
contingency operations overseas with the authority to use 
operation and maintenance funds to purchase an investment item 
of not more than $500,000.
    Sec. 9011. Provides authority for funding the Task Force 
for Business and Stability Operations.
    Sec. 9012. Provides authority for funding the activities of 
the Office of Security Cooperation in Iraq.
    Sec. 9013. Rescissions.--The Committee recommends a general 
provision rescinding funds from prior years as displayed below:

------------------------------------------------------------------------
                                                              Amount
------------------------------------------------------------------------
   2012 Overseas Contingency Operations Appropriations
Other Procurement, Army:
    Gunshot Detection System............................     $10,100,000
    Base Support Communications.........................       5,000,000
    Sense Through The Wall..............................      10,000,000
    Installation Info Infrastructure Mod Program........     125,500,000
    Knight Family.......................................      42,000,000
    Tactical Bridging...................................      15,000,000
Mine Resistant Ambush Protected Vehicle Fund:
    Excess Carryover....................................     400,000,000
Research, Development, Test and Evaluation, Air Force:
    Endurance Unmanned Aerial Vehicles--Blue Devil......      58,000,000
Afghanistan Security Forces Fund:
    CENTCOM Revised Requirement.........................   1,000,000,000
Joint Improvised Explosive Device Defeat Fund
    ALARM...............................................      19,300,000
    Integrated Supply Chain.............................      21,000,000
------------------------------------------------------------------------


  COMPLIANCE WITH PARAGRAPH 7, RULE XVI OF THE STANDING RULES OF THE 
                                 SENATE

    Paragraph 7 of rule XVI requires that Committee reports on 
general appropriations bills identify each Committee amendment 
to the House bill ``which proposes an item of appropriation 
which is not made to carry out the provisions of an existing 
law, a treaty stipulation, or an act or resolution previously 
passed by the Senate during that session.''
    The Committee recommends funding for the following accounts 
which currently lack authorization for fiscal year 2013:
    Military Personnel, Army
    Military Personnel, Navy
    Military Personnel, Marine Corps
    Military Personnel, Air Force
    Reserve Personnel, Army
    Reserve Personnel, Navy
    Reserve Personnel, Marine Corps
    Reserve Personnel, Air Force
    National Guard Personnel, Army
    National Guard Personnel, Air Force
    Operation and Maintenance, Army
    Operation and Maintenance, Navy
    Operation and Maintenance, Marine Corps
    Operation and Maintenance, Air Force
    Operation and Maintenance, Defense-Wide
    Operation and Maintenance, Army Reserve
    Operation and Maintenance, Navy Reserve
    Operation and Maintenance, Marine Corps Reserve
    Operation and Maintenance, Air Force Reserve
    Operation and Maintenance, Army National Guard
    Operation and Maintenance, Air National Guard
    United States Court of Appeals for the Armed Forces
    Environmental Restoration, Army
    Environmental Restoration, Navy
    Environmental Restoration, Air Force
    Environmental Restoration, Defense-Wide
    Environmental Restoration, Formerly Used Defense Sites
    Overseas Humanitarian, Disaster, and Civic Aid
    Cooperative Threat Reduction Account
    Department of Defense Acquisition Workforce Development 
            Fund
    Afghanistan Security Forces Fund
    Afghanistan Infrastructure Fund
    Aircraft Procurement, Army
    Missile Procurement, Army
    Procurement of Weapons and Tracked Combat Vehicles, Army
    Procurement of Ammunition, Army
    Other Procurement, Army
    Aircraft Procurement, Navy
    Weapons Procurement, Navy
    Procurement of Ammunition, Navy and Marine Corps
    Shipbuilding and Conversion, Navy
    Carrier Replacement Program
    Virginia Class Submarine
    Virginia Class Submarine [AP]
    CVN Refueling Overhaul
    CVN Refueling Overhauls [AP]
    DDG-1000 Program
    DDG-51 Destroyer
    DDG-51 Destroyer [AP]
    Littoral Combat Ship
    LPD-17 [AP]
    Joint High Speed Vessel
    Moored Training Ship
    LCAC Service Life Extension Program
    Outfitting, Post Delivery, Conversions and First 
            Destination Transportation
    Completion of Prior Year Shipbuilding Programs
    Other Procurement, Navy
    Procurement, Marine Corps
    Aircraft Procurement, Air Force
    Missile Procurement, Air Force
    Procurement of Ammunition, Air Force
    Other Procurement, Air Force
    Procurement, Defense-Wide
    National Guard and Reserve Equipment
    Research, Development, Test and Evaluation, Army
    Research, Development, Test and Evaluation, Navy
    Research, Development, Test and Evaluation, Air Force
    Research, Development, Test and Evaluation, Defense-Wide
    Operational Test and Evaluation, Defense
    Defense Working Capital Funds
    National Defense Sealift Fund
    Defense Health Program
    Chemical Agents and Munitions Destruction, Defense
    Drug Interdiction and Counter-Drug Activities, Defense
    Joint Improvised Explosive Device Defeat Fund
    Office of the Inspector General
    Central Intelligence Agency Retirement and Disability 
            System Fund
    Intelligence Community Management Account
    Ship Modernization, Operations and Sustainment Fund

COMPLIANCE WITH PARAGRAPH 7(c), RULE XXVI OF THE STANDING RULES OF THE 
                                 SENATE

    Pursuant to paragraph 7(c) of rule XXVI, on August 2, 2012, 
the Committee ordered favorably a bill (H.R. 5856) making 
appropriations for the Department of Defense for the fiscal 
year ending September 30, 2013, and for other purposes, with an 
amendment in the nature of a substitute, provided, that the 
bill be subject to further amendment and that the bill be 
consistent with its spending allocations, by a recorded vote of 
30-0, a quorum being present. The vote was as follows:
        Yeas                          Nays
Chairman Inouye
Mr. Leahy
Mr. Harkin
Ms. Mikulski
Mr. Kohl
Mrs. Murray
Mrs. Feinstein
Mr. Durbin
Mr. Johnson (SD)
Ms. Landrieu
Mr. Reed
Mr. Lautenberg
Mr. Nelson
Mr. Pryor
Mr. Tester
Mr. Brown
Mr. Cochran
Mr. McConnell
Mr. Shelby
Mrs. Hutchison
Mr. Alexander
Ms. Collins
Ms. Murkowski
Mr. Graham
Mr. Kirk
Mr. Coats
Mr. Blunt
Mr. Moran
Mr. Hoeven
Mr. Johnson (WI)

 COMPLIANCE WITH PARAGRAPH 12, RULE XXVI OF THE STANDING RULES OF THE 
                                 SENATE

    Paragraph 12 of rule XXVI requires that Committee reports 
on a bill or joint resolution repealing or amending any statute 
or part of any statute include ``(a) the text of the statute or 
part thereof which is proposed to be repealed; and (b) a 
comparative print of that part of the bill or joint resolution 
making the amendment and of the statute or part thereof 
proposed to be amended, showing by stricken-through type and 
italics, parallel columns, or other appropriate typographical 
devices the omissions and insertions which would be made by the 
bill or joint resolution if enacted in the form recommended by 
the Committee.''
    The Committee bill as recommended contains no such 
provisions.

                        BUDGETARY IMPACT OF BILL


  PREPARED IN CONSULTATION WITH THE CONGRESSIONAL BUDGET OFFICE PURSUANT TO SEC. 308(a), PUBLIC LAW 93-344, AS
                                                     AMENDED
                                            [In millions of dollars]
----------------------------------------------------------------------------------------------------------------
                                                                  Budget authority               Outlays
                                                             ---------------------------------------------------
                                                               Committee    Amount  in   Committee    Amount  in
                                                               allocation      bill      allocation      bill
----------------------------------------------------------------------------------------------------------------
Comparison of amounts in the bill with Committee allocations
 to its subcommittees of amounts in the budget resolution
 for 2013: Subcommittee on Defense:
    Mandatory...............................................          514          514          514       \1\514
    Discretionary...........................................      511,161      604,712      168,600   \1\620,721
        Security............................................      510,907      604,458           NA           NA
        Nonsecurity.........................................          254          254           NA           NA
Projections of outlays associated with the recommendation:
    2013....................................................  ...........  ...........  ...........   \2\382,121
    2014....................................................  ...........  ...........  ...........      139,037
    2015....................................................  ...........  ...........  ...........       47,466
    2016....................................................  ...........  ...........  ...........       19,126
    2017 and future years...................................  ...........  ...........  ...........       12,929
Financial assistance to State and local governments for                NA  ...........           NA  ...........
 2013.......................................................

----------------------------------------------------------------------------------------------------------------
\1\Includes outlays from prior-year budget authority.
\2\Excludes outlays from prior-year budget authority.

NA: Not applicable.

Consistent with the funding recommended in the bill for overseas contingency operations and in accordance with
  section 251(b)(2)(A) of the BBEDCA and section 106 of the Deficit Control Act of 2011, the Committee
  anticipates that the Budget Committee will file a revised section 302(a) allocation for the Committee on
  Appropriations reflecting an upward adjustment of $93,296,796,000 in budget authority plus associated outlays.


                 COMPARATIVE STATEMENT OF NEW BUDGET (OBLIGATIONAL) AUTHORITY FOR FISCAL YEAR 2012 AND BUDGET ESTIMATES AND AMOUNTS RECOMMENDED IN THE BILL FOR FISCAL YEAR 2013
                                                                                    [In thousands of dollars]
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                               Senate Committee recommendation compared with  (+
                                                                                                                                                                     or -)
                                   Item                                          2012       Budget estimate  House allowance     Committee    --------------------------------------------------
                                                                            appropriation                                      recommendation        2012
                                                                                                                                                appropriation   Budget estimate  House allowance
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                                 TITLE I

                            MILITARY PERSONNEL

Military Personnel, Army.................................................      43,298,409       40,777,844       40,730,014       40,157,392       -3,141,017         -620,452         -572,622
Military Personnel, Navy.................................................      26,803,334       27,090,893       27,075,933       26,989,384         +186,050         -101,509          -86,549
Military Personnel, Marine Corps.........................................      13,635,136       12,481,050       12,560,999       12,529,469       -1,105,667          +48,419          -31,530
Military Personnel, Air Force............................................      28,096,708       28,048,539       28,124,109       28,053,829          -42,879           +5,290          -70,280
Reserve Personnel, Army..................................................       4,289,407        4,513,753        4,456,823        4,341,823          +52,416         -171,930         -115,000
Reserve Personnel, Navy..................................................       1,935,544        1,898,668        1,871,688        1,875,598          -59,946          -23,070           +3,910
Reserve Personnel, Marine Corps..........................................         644,722          664,641          651,861          659,621          +14,899           -5,020           +7,760
Reserve Personnel, Air Force.............................................       1,712,705        1,741,365        1,743,875        1,728,505          +15,800          -12,860          -15,370
National Guard Personnel, Army...........................................       7,585,645        8,103,207        8,089,477        8,005,077         +419,432          -98,130          -84,400
National Guard Personnel, Air Force......................................       3,088,929        3,110,065        3,158,015        3,161,765          +72,836          +51,700           +3,750
                                                                          ----------------------------------------------------------------------------------------------------------------------
      Total, title I, Military Personnel.................................     131,090,539      128,430,025      128,462,794      127,502,463       -3,588,076         -927,562         -960,331
                                                                          ======================================================================================================================
                                 TITLE II

                        OPERATION AND MAINTENANCE

Operation and Maintenance, Army..........................................      31,072,902       36,608,592       36,422,738       33,804,145       +2,731,243       -2,804,447       -2,618,593
Operation and Maintenance, Navy..........................................      38,120,821       41,606,943       41,463,773       40,479,556       +2,358,735       -1,127,387         -984,217
Operation and Maintenance, Marine Corps..................................       5,542,937        5,983,163        6,075,667        5,894,963         +352,026          -88,200         -180,704
Operation and Maintenance, Air Force.....................................      34,985,486       35,435,360       35,384,795       34,983,793           -1,693         -451,567         -401,002
Operation and Maintenance, Defense-Wide..................................      30,152,008       31,993,013       31,740,813       31,331,839       +1,179,831         -661,174         -408,974
Operation and Maintenance, Army Reserve..................................       3,071,733        3,162,008        3,199,423        3,140,508          +68,775          -21,500          -58,915
Operation and Maintenance, Navy Reserve..................................       1,305,134        1,246,982        1,256,347        1,246,982          -58,152   ...............          -9,365
Operation and Maintenance, Marine Corps Reserve..........................         271,443          272,285          277,377          272,285             +842   ...............          -5,092
Operation and Maintenance, Air Force Reserve.............................       3,274,359        3,166,482        3,362,041        3,227,382          -46,977          +60,900         -134,659
Operation and Maintenance, Army National Guard...........................       6,924,932        7,108,612        7,187,731        7,075,042         +150,110          -33,570         -112,689
Operation and Maintenance, Air National Guard............................       6,098,780        6,015,455        6,616,826        6,493,155         +394,375         +477,700         -123,671
United States Court of Appeals for the Armed Forces......................          13,861           13,516           13,516           13,516             -345   ...............  ...............
Environmental Restoration, Army..........................................         346,031          335,921          335,921          335,921          -10,110   ...............  ...............
Environmental Restoration, Navy..........................................         308,668          310,594          310,594          310,594           +1,926   ...............  ...............
Environmental Restoration, Air Force.....................................         525,453          529,263          529,263          529,263           +3,810   ...............  ...............
Environmental Restoration, Defense-Wide..................................          10,716           11,133           11,133           11,133             +417   ...............  ...............
Environmental Restoration, Formerly Used Defense Sites...................         326,495          237,543          237,543          287,543          -38,952          +50,000          +50,000
Overseas Humanitarian, Disaster, and Civic Aid...........................         107,662          108,759          108,759          108,759           +1,097   ...............  ...............
Cooperative Threat Reduction Account.....................................         508,219          519,111          519,111          519,111          +10,892   ...............  ...............
Department of Defense Acquisition Workforce Development Fund.............         105,501          274,198           50,198          720,000         +614,499         +445,802         +669,802
                                                                          ----------------------------------------------------------------------------------------------------------------------
      Total, title II, Operation and maintenance.........................     163,073,141      174,938,933      175,103,569      170,785,490       +7,712,349       -4,153,443       -4,318,079
                                                                          ======================================================================================================================
                                TITLE III

                               PROCUREMENT

Aircraft Procurement, Army...............................................       5,360,334        5,853,729        6,115,226        5,414,061          +53,727         -439,668         -701,165
Missile Procurement, Army................................................       1,461,223        1,302,689        1,602,689        1,429,665          -31,558         +126,976         -173,024
Procurement of Weapons and Tracked Combat Vehicles, Army.................       2,070,405        1,501,706        1,884,706        1,687,823         -382,582         +186,117         -196,883
Procurement of Ammunition, Army..........................................       1,884,424        1,739,706        1,576,768        1,624,380         -260,044         -115,326          +47,612
Other Procurement, Army..................................................       7,924,214        6,326,245        6,488,045        4,980,209       -2,944,005       -1,346,036       -1,507,836
Aircraft Procurement, Navy...............................................      17,675,734       17,129,296       17,518,324       16,936,358         -739,376         -192,938         -581,966
Weapons Procurement, Navy................................................       3,224,432        3,117,578        3,072,112        3,066,919         -157,513          -50,659           -5,193
Procurement of Ammunition, Navy and Marine Corps.........................         626,848          759,539          677,243          719,154          +92,306          -40,385          +41,911
Shipbuilding and Conversion, Navy........................................      14,919,114       13,579,845       15,236,126       15,614,855         +695,741       +2,035,010         +378,729
Other Procurement, Navy..................................................       6,013,385        6,169,378        6,364,191        6,170,286         +156,901             +908         -193,905
Procurement, Marine Corps................................................       1,422,570        1,622,955        1,482,081        1,334,448          -88,122         -288,507         -147,633
Aircraft Procurement, Air Force..........................................      12,950,000       11,002,999       11,320,899       11,260,646       -1,689,354         +257,647          -60,253
    Coast Guard (by transfer)............................................         (63,500)  ...............  ...............  ...............        (-63,500)  ...............  ...............
Missile Procurement, Air Force...........................................       6,080,877        5,491,846        5,449,146        4,913,276       -1,167,601         -578,570         -535,870
Advanced Extremely High Frequency Communications Satellites, Advanced      ...............         833,500   ...............  ...............  ...............        -833,500   ...............
 appropriation fiscal year 2014..........................................
    Advanced appropriation fiscal year 2015..............................  ...............         763,900   ...............  ...............  ...............        -763,900   ...............
    Advanced appropriation fiscal year 2016..............................  ...............         708,400   ...............  ...............  ...............        -708,400   ...............
    Advanced appropriation fiscal year 2017..............................  ...............       1,107,200   ...............  ...............  ...............      -1,107,200   ...............
    Advanced appropriation fiscal year 2018..............................  ...............       1,013,700   ...............  ...............  ...............      -1,013,700   ...............
                                                                          ----------------------------------------------------------------------------------------------------------------------
      Total, Advanced appropriations.....................................  ...............       4,426,700   ...............  ...............  ...............      -4,426,700   ...............

Procurement of Ammunition, Air Force.....................................         499,185          599,194          599,194          593,194          +94,009           -6,000           -6,000
Other Procurement, Air Force.............................................      17,403,564       16,720,848       16,632,575       17,008,348         -395,216         +287,500         +375,773
Procurement, Defense-Wide................................................       4,893,428        4,187,935        4,429,335        4,692,685         -200,743         +504,750         +263,350
National Guard and Reserve Equipment.....................................  ...............  ...............       2,000,000   ...............  ...............  ...............      -2,000,000
Defense Production Act Purchases.........................................         169,964           89,189           63,531          189,189          +19,225         +100,000         +125,658
                                                                          ----------------------------------------------------------------------------------------------------------------------
      Total, title III, Procurement......................................     104,579,701      101,621,377      102,512,191       97,635,496       -6,944,205       -3,985,881       -4,876,695
          Fiscal year 2013...............................................    (104,579,701)     (97,194,677)    (102,512,191)     (97,635,496)     (-6,944,205)       (+440,819)     (-4,876,695)
                                                                          ======================================================================================================================
                                 TITLE IV

                RESEARCH, DEVELOPMENT, TEST AND EVALUATION

Research, Development, Test and Evaluation, Army.........................       8,745,492        8,929,415        8,593,055        8,427,588         -317,904         -501,827         -165,467
Research, Development, Test and Evaluation, Navy.........................      17,753,940       16,882,877       16,987,768       16,646,307       -1,107,633         -236,570         -341,461
Research, Development, Test and Evaluation, Air Force....................      26,535,996       25,428,046       25,117,692       25,374,286       -1,161,710          -53,760         +256,594
Research, Development, Test and Evaluation, Defense-Wide.................      19,193,955       17,982,161       19,100,362       18,419,129         -774,826         +436,968         -681,233
Operational Test and Evaluation, Defense.................................         191,292          185,268          185,268          223,768          +32,476          +38,500          +38,500
                                                                          ----------------------------------------------------------------------------------------------------------------------
      Total, title IV, Research, Development, Test and Evaluation........      72,420,675       69,407,767       69,984,145       69,091,078       -3,329,597         -316,689         -893,067
                                                                          ======================================================================================================================
                                 TITLE V

                      REVOLVING AND MANAGEMENT FUNDS

Defense Working Capital Funds............................................       1,575,010        1,516,184        1,516,184        1,516,184          -58,826   ...............  ...............
National Defense Sealift Fund............................................       1,100,519          608,136          564,636          697,840         -402,679          +89,704         +133,204
                                                                          ----------------------------------------------------------------------------------------------------------------------
      Total, title V, Revolving and Management Funds.....................       2,675,529        2,124,320        2,080,820        2,214,024         -461,505          +89,704         +133,204
                                                                          ======================================================================================================================
                                 TITLE VI

                   OTHER DEPARTMENT OF DEFENSE PROGRAMS

Defense Health Program:
    Operation and maintenance............................................      30,582,235       31,349,279       31,122,095       30,707,349         +125,114         -641,930         -414,746
    Procurement..........................................................         632,518          506,462          521,762          506,462         -126,056   ...............         -15,300
    Research, development, test and evaluation...........................       1,267,306          672,977        1,258,377        1,026,977         -240,329         +354,000         -231,400
                                                                          ----------------------------------------------------------------------------------------------------------------------
      Total, Defense Health Program......................................      32,482,059       32,528,718       32,902,234       32,240,788         -241,271         -287,930         -661,446

Chemical Agents and Munitions Destruction, Defense:
    Operation and maintenance............................................       1,147,691          635,843          635,843          635,843         -511,848   ...............  ...............
    Procurement..........................................................  ...............          18,592           18,592           18,592          +18,592   ...............  ...............
    Research, development, test and evaluation...........................         406,731          647,351          647,351          647,351         +240,620   ...............  ...............
                                                                          ----------------------------------------------------------------------------------------------------------------------
      Total, Chemical Agents.............................................       1,554,422        1,301,786        1,301,786        1,301,786         -252,636   ...............  ...............

Drug Interdiction and Counter-Drug Activities, Defense...................       1,209,620          999,363        1,133,363        1,138,263          -71,357         +138,900           +4,900
Joint Improvised Explosive Device Defeat Fund............................  ...............         227,414          217,414   ...............  ...............        -227,414         -217,414
Joint Urgent Operational Needs Fund......................................  ...............          99,477   ...............  ...............  ...............         -99,477   ...............
Office of the Inspector General..........................................         346,919          273,821          350,321          332,921          -13,998          +59,100          -17,400
                                                                          ----------------------------------------------------------------------------------------------------------------------
      Total, title VI, Other Department of Defense Programs..............      35,593,020       35,430,579       35,905,118       35,013,758         -579,262         -416,821         -891,360
                                                                          ======================================================================================================================
                                TITLE VII

                             RELATED AGENCIES

Central Intelligence Agency Retirement and Disability System Fund........         513,700          514,000          514,000          514,000             +300   ...............  ...............
Intelligence Community Management Account (ICMA).........................         547,891          540,252          511,476          542,346           -5,545           +2,094          +30,870
                                                                          ----------------------------------------------------------------------------------------------------------------------
      Total, title VII, Related agencies.................................       1,061,591        1,054,252        1,025,476        1,056,346           -5,245           +2,094          +30,870
                                                                          ======================================================================================================================
                                TITLE VIII

                            GENERAL PROVISIONS

Additional transfer authority (Sec. 8005)................................      (3,750,000)      (5,000,000)      (3,000,000)      (5,000,000)     (+1,250,000)  ...............     (+2,000,000)
Indian Financing Act incentives (Sec. 8019)..............................          15,000   ...............          15,000           15,000   ...............         +15,000   ...............
FFRDC (Sec. 8023)........................................................        -150,245   ...............  ...............  ...............        +150,245   ...............  ...............
Overseas Military Facility Invest Recovery (Sec. 8028)...................           1,000   ...............  ...............  ...............          -1,000   ...............  ...............
Rescissions (Sec. 8040)..................................................      -2,575,217   ...............      -1,019,316       -2,105,755         +469,462       -2,105,755       -1,086,439
O&M, Defense-wide transfer authority (Sec. 8051).........................         (30,000)         (30,000)         (30,000)         (30,000)  ...............  ...............  ...............
O&M, Army transfer authority (Sec. 8066).................................        (124,493)        (133,381)        (133,381)        (133,381)         (+8,888)  ...............  ...............
Fisher House Foundation..................................................           4,000   ...............           4,000   ...............          -4,000   ...............          -4,000
National grants (Sec. 8076)..............................................          44,000   ...............          44,000           20,000          -24,000          +20,000          -24,000
Shipbuilding unspecified transfer (Sec. 8080) (outlays)..................  ...............  ...............  ...............  ...............  ...............  ...............  ...............
Shipbuilding & conversion funds, Navy (Sec. 8080)........................           8,000            8,000            8,000            8,000   ...............  ...............  ...............
Global Security Contingency Fund (O&M, Defense-wide (transfer) (Sec.             (200,000)        (200,000)  ...............        (200,000)  ...............  ...............       (+200,000)
 8068)...................................................................
Working Capital Fund excess cash balances................................        -515,000   ...............  ...............  ...............        +515,000   ...............  ...............
Excess Army Working Capital Fund carryover...............................  ...............  ...............      -2,460,900   ...............  ...............  ...............      +2,460,900
Fisher House transfer authority (Sec. 8093)..............................         (11,000)         (11,000)         (11,000)         (11,000)  ...............  ...............  ...............
ICMA transfer authority (Sec. 8089)......................................         (20,000)         (20,000)  ...............         (20,000)  ...............  ...............        (+20,000)
Defense Health O&M transfer authority (Sec. 8098)........................        (135,631)        (139,204)        (139,204)        (139,204)         (+3,573)  ...............  ...............
Stop Loss transfer fund (outlays)........................................  ...............  ...............  ...............  ...............  ...............  ...............  ...............
Alternative Energy Resources for Deployed Forces.........................          10,000   ...............  ...............  ...............         -10,000   ...............  ...............
Operation and Maintenance, Defense-Wide (Sec. 8105)......................         250,000   ...............         270,000   ...............        -250,000   ...............        -270,000
    (transfer authority).................................................  ...............         (51,000)  ...............         (51,000)        (+51,000)  ...............        (+51,000)
MIP Transfer Fund (Sec. 8087)............................................         310,758   ...............  ...............  ...............        -310,758   ...............  ...............
Ship Modernization, Operations, Sustainment Fund (Sec. 8103).............  ...............  ...............  ...............       2,382,100       +2,382,100       +2,382,100       +2,382,100
Eliminate civilian pay raise (Sec. 8119).................................  ...............  ...............        -258,524   ...............  ...............  ...............        +258,524
Defense spending freeze (exclude Title I, Defense Health Program, and      ...............  ...............      -1,072,581   ...............  ...............  ...............      +1,072,581
 Title IX) (House).......................................................
                                                                          ----------------------------------------------------------------------------------------------------------------------
      Total, Title VIII, General Provisions..............................      -2,597,704            8,000       -4,470,321          319,345       +2,917,049         +311,345       +4,789,666
                                                                          ======================================================================================================================
                                 TITLE IX

                  OVERSEAS CONTINGENCY OPERATIONS (OCO)

                            Military Personnel

Military Personnel, Army (OCO)...........................................       7,195,335        9,165,082        9,263,779        9,790,082       +2,594,747         +625,000         +526,303
Military Personnel, Navy (OCO)...........................................       1,259,234          874,625          879,798          869,625         -389,609           -5,000          -10,173
Military Personnel, Marine Corps (OCO)...................................         714,360        1,621,356        1,640,838        1,623,356         +908,996           +2,000          -17,482
Military Personnel, Air Force (OCO)......................................       1,492,381        1,286,783        1,300,640        1,286,783         -205,598   ...............         -13,857
Reserve Personnel, Army (OCO)............................................         207,162          156,893          158,583          156,893          -50,269   ...............          -1,690
Reserve Personnel, Navy (OCO)............................................          44,530           39,335           39,759           39,335           -5,195   ...............            -424
Reserve Personnel, Marine Corps (OCO)....................................          25,421           24,722           24,988           24,722             -699   ...............            -266
Reserve Personnel, Air Force (OCO).......................................          26,815           25,348           25,621           25,348           -1,467   ...............            -273
National Guard Personnel, Army (OCO).....................................         664,579          583,804          590,091          583,804          -80,775   ...............          -6,287
National Guard Personnel, Air Force (OCO)................................           9,435           10,473           10,586           10,473           +1,038   ...............            -113
                                                                          ----------------------------------------------------------------------------------------------------------------------
      Total, Military Personnel..........................................      11,639,252       13,788,421       13,934,683       14,410,421       +2,771,169         +622,000         +475,738

                        Operation and Maintenance

Operation & Maintenance, Army (OCO)......................................      44,794,156       28,591,441       26,682,437       30,578,256      -14,215,900       +1,986,815       +3,895,819
Operation & Maintenance, Navy (OCO)......................................       7,674,026        5,880,395        5,880,395        6,968,812         -705,214       +1,088,417       +1,088,417
    Coast Guard (by transfer) (OCO)......................................  ...............        (254,461)        (254,461)  ...............  ...............       (-254,461)       (-254,461)
Operation & Maintenance, Marine Corps (OCO)..............................       3,935,210        4,066,340        4,566,340        4,108,340         +173,130          +42,000         -458,000
Operation & Maintenance, Air Force (OCO).................................      10,879,347        9,241,613        9,136,236        9,291,493       -1,587,854          +49,880         +155,257
Operation & Maintenance, Defense-Wide (OCO)..............................       9,252,211        7,824,579        7,790,579        8,274,052         -978,159         +449,473         +483,473
    Coalition support funds (OCO)........................................      (1,690,000)      (1,750,000)      (1,750,000)      (1,750,000)        (+60,000)  ...............  ...............
Operation & Maintenance, Army Reserve (OCO)..............................         217,500          154,537          157,887          154,537          -62,963   ...............          -3,350
Operation & Maintenance, Navy Reserve (OCO)..............................          74,148           55,924           55,924           55,924          -18,224   ...............  ...............
Operation & Maintenance, Marine Corps Reserve (OCO)......................          36,084           25,477           25,477           25,477          -10,607   ...............  ...............
Operation & Maintenance, Air Force Reserve (OCO).........................         142,050          120,618          120,618          120,618          -21,432   ...............  ...............
Operation & Maintenance, Army National Guard (OCO).......................         377,544          382,448          392,448          382,448           +4,904   ...............         -10,000
Operation & Maintenance, Air National Guard (OCO)........................          34,050           19,975           34,500           19,975          -14,075   ...............         -14,525
Overseas Contingency Operations Transfer Fund (OCO)......................  ...............  ...............       3,231,500   ...............  ...............  ...............      -3,231,500
                                                                          ----------------------------------------------------------------------------------------------------------------------
      Subtotal, Operation and Maintenance................................      77,416,326       56,363,347       58,074,341       59,979,932      -17,436,394       +3,616,585       +1,905,591

Afghanistan Infrastructure Fund (OCO)....................................         400,000          400,000          200,000          350,000          -50,000          -50,000         +150,000
Afghanistan Security Forces Fund (OCO)...................................      11,200,000        5,749,167        4,592,213        5,149,167       -6,050,833         -600,000         +556,954
                                                                          ----------------------------------------------------------------------------------------------------------------------
      Total, Operation and Maintenance...................................      89,016,326       62,512,514       62,866,554       65,479,099      -23,537,227       +2,966,585       +2,612,545

                               Procurement

Aircraft Procurement, Army (OCO).........................................       1,137,381          486,200          541,600        1,140,294           +2,913         +654,094         +598,694
Missile Procurement, Army (OCO)..........................................         126,556           49,653           49,653           67,951          -58,605          +18,298          +18,298
Procurement of Weapons and Tracked Combat Vehicles, Army (OCO)...........          37,117           15,422           15,422           15,422          -21,695   ...............  ...............
Procurement of Ammunition, Army (OCO)....................................         208,381          357,493          338,493          326,193         +117,812          -31,300          -12,300
Other Procurement, Army (OCO)............................................       1,334,345        2,015,907        2,005,907        2,284,190         +949,845         +268,283         +278,283
Aircraft Procurement, Navy (OCO).........................................         480,935          164,582          146,277          426,436          -54,499         +261,854         +280,159
Weapons Procurement, Navy (OCO)..........................................          41,070           23,500           22,500           23,500          -17,570   ...............          +1,000
Procurement of Ammunition, Navy and Marine Corps (OCO)...................         317,100          285,747          284,450          284,356          -32,744           -1,391              -94
Other Procurement, Navy (OCO)............................................         236,125           98,882           98,882           98,882         -137,243   ...............  ...............
Procurement, Marine Corps (OCO)..........................................       1,233,996          943,683          943,683          865,977         -368,019          -77,706          -77,706
Aircraft Procurement, Air Force (OCO)....................................       1,235,777          305,600          305,600          395,327         -840,450          +89,727          +89,727
Missile Procurement, Air Force (OCO).....................................          41,220           34,350           34,350           34,350           -6,870   ...............  ...............
Procurement of Ammunition, Air Force (OCO)...............................         109,010          116,203          116,203          116,203           +7,193   ...............  ...............
Other Procurement, Air Force (OCO).......................................       3,088,510        2,818,270        2,785,170        2,684,470         -404,040         -133,800         -100,700
Procurement, Defense-Wide (OCO)..........................................         405,768          196,349          217,849          362,749          -43,019         +166,400         +144,900
National Guard and Reserve Equipment (OCO)...............................       1,000,000   ...............  ...............       1,000,000   ...............      +1,000,000       +1,000,000
Mine Resistant Ambush Protected Vehicle Fund (OCO).......................       2,600,170   ...............  ...............  ...............      -2,600,170   ...............  ...............
                                                                          ----------------------------------------------------------------------------------------------------------------------
      Total, Procurement.................................................      13,633,461        7,911,841        7,906,039       10,126,300       -3,507,161       +2,214,459       +2,220,261

                Research, Development, Test and Evaluation

Research, Development, Test & Evaluation, Army (OCO).....................          18,513           19,860           14,860           42,357          +23,844          +22,497          +27,497
Research, Development, Test & Evaluation, Navy (OCO).....................          53,884           60,119           60,119           52,519           -1,365           -7,600           -7,600
Research, Development, Test & Evaluation, Air Force (OCO)................         259,600           53,150           53,150           53,150         -206,450   ...............  ...............
Research, Development, Test and Evaluation, Defense-Wide (OCO)...........         194,361          112,387          107,387          112,387          -81,974   ...............          +5,000
                                                                          ----------------------------------------------------------------------------------------------------------------------
      Total, Research, Development, Test and Evaluation..................         526,358          245,516          235,516          260,413         -265,945          +14,897          +24,897

                      Revolving and Management Funds

Defense Working Capital Funds (OCO)......................................         435,013          503,364          293,600        1,467,864       +1,032,851         +964,500       +1,174,264
                                                                          ----------------------------------------------------------------------------------------------------------------------
      Total, Revolving and Management Funds..............................         435,013          503,364          293,600        1,467,864       +1,032,851         +964,500       +1,174,264
                                                                          ======================================================================================================================
                   Other Department of Defense Programs

Defense Health Program:
    Operation and maintenance (OCO)......................................       1,228,288          993,898        1,003,898          993,898         -234,390   ...............         -10,000
    Procurement (OCO)....................................................  ...............  ...............  ...............  ...............  ...............  ...............  ...............
    Research, development, test & evaluation (OCO).......................  ...............  ...............  ...............  ...............  ...............  ...............  ...............
                                                                          ----------------------------------------------------------------------------------------------------------------------
      Total, Defense Health Program......................................       1,228,288          993,898        1,003,898          993,898         -234,390   ...............         -10,000

Drug Interdiction and Counter-Drug Activities, Defense (OCO).............         456,458          469,025          469,025          469,025          +12,567   ...............  ...............
Joint IED Defeat Fund (OCO)..............................................       2,441,984        1,675,400        1,614,900        1,514,114         -927,870         -161,286         -100,786
Joint Urgent Operational Needs Fund (OCO)................................  ...............         100,000   ...............  ...............  ...............        -100,000   ...............
Office of the Inspector General (OCO)....................................          11,055           10,766           10,766           10,766             -289   ...............  ...............
                                                                          ----------------------------------------------------------------------------------------------------------------------
      Total, Other Department of Defense Programs........................       4,137,785        3,249,089        3,098,589        2,987,803       -1,149,982         -261,286         -110,786
                                                                          ======================================================================================================================
                       TITLE IX General Provisions

Additional transfer authority (OCO) (Sec. 9002)..........................      (4,000,000)      (4,000,000)      (3,000,000)      (4,000,000)  ...............  ...............     (+1,000,000)
Troop reduction (OCO)....................................................      -4,042,500   ...............  ...............  ...............      +4,042,500   ...............  ...............
Rescissions (OCO) (Sec. 9013)............................................        -380,060   ...............        -579,900       -1,705,900       -1,325,840       -1,705,900       -1,126,000
Operation and Maintenance, Defense-Wide (House) (OCO)....................  ...............  ...............        -650,000   ...............  ...............  ...............        +650,000
                                                                          ----------------------------------------------------------------------------------------------------------------------
      Total, General Provisions..........................................      -4,422,560   ...............      -1,229,900       -1,705,900       +2,716,660       -1,705,900         -476,000
                                                                          ----------------------------------------------------------------------------------------------------------------------
      Total, Title IX....................................................     114,965,635       88,210,745       87,105,081       93,026,000      -21,939,635       +4,815,255       +5,920,919
                                                                          ======================================================================================================================
      Total for the bill (net)...........................................     622,862,127      601,225,998      597,708,873      596,644,000      -26,218,127       -4,581,998       -1,064,873
          Less appropriations for subsequent years.......................  ...............      -4,426,700   ...............  ...............  ...............      +4,426,700   ...............
          Plus appropriations provided in prior years....................  ...............  ...............  ...............  ...............  ...............  ...............  ...............
                                                                          ----------------------------------------------------------------------------------------------------------------------
      Net grand total....................................................     622,862,127      596,799,298      597,708,873      596,644,000      -26,218,127         -155,298       -1,064,873
------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------