[House Report 109-49]
[From the U.S. Government Publishing Office]
109th Congress Report
HOUSE OF REPRESENTATIVES
1st Session 109-49
======================================================================
PROVIDING FOR CONSIDERATION OF H.R. 6, ENERGY POLICY ACT OF 2005
_______
April 19, 2005.--Referred to the House Calendar and ordered to be
printed
_______
Mr. Sessions, from the Committee on Rules, submitted the following
R E P O R T
[To accompany H. Res. 219]
The Committee on Rules, having had under consideration
House Resolution 219, by a non-record vote, reports the same to
the House with the recommendation that the resolution be
adopted.
SUMMARY OF PROVISIONS OF THE RESOLUTION
The resolution provides for consideration of H.R. 6, the
Energy Policy Act of 2005, under a structured rule. The rule
provides one hour and 30 minutes of general debate with 30
minutes equally divided and controlled by the chairman and
ranking minority member of the Committee on Energy and Commerce
and 20 minutes equally divided and controlled by the chairmen
and ranking minority members of each of the following
Committees: Science, Resources, and Ways and Means. The rule
waives all points of order against consideration of the bill.
The rule makes in order only those amendments printed in
this report, and provides that those amendments may be offered
only in the order printed in this report, may be offered only
by a Member designated in this report, shall be considered as
read, shall be debatable for the time specified in this report
equally divided and controlled by the proponent and an
opponent, shall not be subject to amendment except as specified
in the report, and shall not be subject to a demand for a
division of the question in the House or in the Committee of
the Whole. The rule waives all points of order against the
amendments printed in this report. The rule also provides one
motion to recommit with or without instructions.
COMMITTEE VOTES
Pursuant to clause 3(b) of House rule XIII the results of
each record vote on an amendment or motion to report, together
with the names of those voting for and against, are printed
below:
RULES COMMITTEE RECORD VOTE NO. 32
Date: April 19, 2005.
Measure: H.R. 6, Energy Policy Act of 2005.
Motion by: Mrs. Slaughter.
Summary of motion: To make in order and provide the
appropriate waivers for the amendment offered by Mr. Stupak,
which prohibits any Federal or state permit or lease for new
oil or gas slant, directional, or offshore drilling in or under
the Great Lakes.
Results: Defeated 3 to 8.
Vote by Members: Hastings (WA)--Nay; Sessions--Nay;
Putnam--Nay; Capito--Nay; Cole--Nay; Bishop--Nay; Gingrey--Nay;
Slaughter--Yea; McGovern--Yea; Matsui--Yea; Dreier--Nay.
RULES COMMITTEE RECORD VOTE NO. 33
Date: April 19, 2005.
Measure: H.R. 6, Energy Policy Act of 2005.
Motion by: Mr. McGovern.
Summary of motion: To make in order and provide the
appropriate waivers for the amendment offered by Mr. Dingell,
which restores fairness to the hydroelectric relicensing
provisions of the bill by insuring that all parties to a
licensing proceeding are entitled to a trial-type hearing for
any issues of disputed material fact and that all parties may
offer alternative conditions and prescriptions that must be
accepted under certain conditions. Allows the resources
Secretaries to consolidate multiple requests for trial-type
hearings. Directs the resources Secretaries in the case of
multiple alternatives to choose the alternative that is best
suited to the relevant standards in the Federal Power Act.
Results: Defeated 3 to 8.
Vote by Members: Hastings (WA)--Nay; Sessions--Nay;
Putnam--Nay; Capito--Nay; Cole--Nay; Bishop--Nay; Gingrey--Nay;
Slaughter--Yea; McGovern--Yea; Matsui--Yea; Dreier--Nay.
RULES COMMITTEE RECORD VOTE NO. 34
Date: April 19, 2005.
Measure: H.R. 6, Energy Policy Act of 2005.
Motion by: Mr. McGovern.
Summary of motion: To make in order and provide the
appropriate waivers for the amendment offered by Mr. Rahall,
which strikes Title XXI which eliminates provisions of law
which require certain federal coal resources be made available
on a competitive basis.
Results: Defeated 3 to 8.
Vote by Members: Hastings (WA)--Nay; Sessions--Nay;
Putnam--Nay; Capito--Nay; Cole--Nay; Bishop--Nay; Gingrey--Nay;
Slaughter--Yea; McGovern--Yea; Matsui--Yea; Dreier--Nay.
RULES COMMITTEE RECORD VOTE NO. 35
Date: April 19, 2005.
Measure: H.R. 6, Energy Policy Act of 2005.
Motion by: Mr. McGovern.
Summary of motion: To make in order and provide the
appropriate waivers for the amendment offered by Mrs. Capps,
which strikes the safe harbor provision for MTBE; strikes the
transition assistance for MTBE manufacturers; and speeds up the
national phaseout of MTBE to 4 years from date of enactment.
Results: Defeated 3 to 8.
Vote by Members: Hastings (WA)--Nay; Sessions--Nay;
Putnam--Nay; Capito--Nay; Cole--Nay; Bishop--Nay; Gingrey--Nay;
Slaughter--Yea; McGovern--Yea; Matsui--Yea; Dreier--Nay.
RULES COMMITTEE RECORD VOTE NO. 36
Date: April 19, 2005.
Measure: H.R. 6, Energy Policy Act of 2005.
Motion by: Mrs. Matsui.
Summary of motion: To make in order and provide the
appropriate waivers for the amendment offered by Mr. Davis of
Florida, which strikes section 330, ``Appeals Relating to
Pipeline Construction or Offshore Mineral Development
Projects.''.
Results: Defeated 3 to 8.
Vote by Members: Hastings (WA)--Nay; Sessions--Nay;
Putnam--Nay; Capito--Nay; Cole--Nay; Bishop--Nay; Gingrey--Nay;
Slaughter--Yea; McGovern--Yea; Matsui--Yea; Dreier--Nay.
RULES COMMITTEE RECORD VOTE NO. 37
Date: April 19, 2005.
Measure: H.R. 6, Energy Policy Act of 2005.
Motion by: Mrs. Matsui.
Summary of motion: To make in order and provide the
appropriate waivers for the amendment offered by Mrs. Johnson
of Texas, which strikes section 1443 of H.R. 6. Under the
existing Act, areas that have unhealthy air are required to
reduce ozone-forming smog pollution by set statutory deadlines.
Section 1443 would delay the set statutory deadlines.
Results: Defeated 3 to 8.
Vote by Members: Hastings (WA)--Nay; Sessions--Nay;
Putnam--Nay; Capito--Nay; Cole--Nay; Bishop--Nay; Gingrey--Nay;
Slaughter--Yea; McGovern--Yea; Matsui--Yea; Dreier--Nay.
RULES COMMITTEE RECORD VOTE NO. 38
Date: April 19, 2005.
Measure: H.R. 6, Energy Policy Act of 2005.
Motion by: Mrs. Matsui.
Summary of motion: To make in order and provide the
appropriate waivers for the amendment offered by Mr. Gilchrest,
which requires the development of a National Climate Change
Strategy, with the goal of stabilizing greenhouse gas
concentrations in our atmosphere.
Results: Defeated 3 to 8.
Vote by Members: Hastings (WA)--Nay; Sessions--Nay;
Putnam--Nay; Capito--Nay; Cole--Nay; Bishop--Nay; Gingrey--Nay;
Slaughter--Yea; McGovern--Yea; Matsui--Yea; Dreier--Nay.
SUMMARY OF AMENDMENTS MADE IN ORDER
1. Barton: Manager's Amendment. Changes Table of Contents.
Sets ESPC cap at $500 million by having OMB approve contracts.
Includes ceiling fan efficiency standards. Limits preemption on
state consumer product energy efficiency standards. Includes
affordable housing amendments. Moves photovoltaic program back
from DOE to GSA. Deletes duplicative provisions reported by the
Resources Committee. Adds the Natural Gas Market Reform
provision from the H.R. 6 conference report of the 108th
Congress back into bill. Allows clean air coal projects of 600
MW or less. Makes employee benefits provision subject to
appropriations. Clarifies references to firearm laws under
nuclear security provision. Includes aircraft idling study as
modified by the Transportation and Infrastructure Committee.
Includes engine idling program as amended. Includes hydrogen
fuel cell bus program. Reinserts Western MI Demonstration
Project originally from the H.R. 6 conference report. Reinserts
Western Hemisphere Energy Cooperation originally from the H.R.
6 conference report. Reinserts Arctic Engineering Research
Center originally from the H.R. 6 conference report. Reinserts
Barrow Geophysical Research Facility originally from the H.R. 6
conference report. Clarifies tax status of Ultra-deep
consortium. Amends PUHCA language to allow savings clause and
makes enforcement provisions effective on date of enactment.
Requires regional boards with FERC participation to study
security constrained economic dispatch. Changes Bump Up date.
Modifies Soybean oil reference. Modifies NAS MTBE study date.
Includes on-road and off-road diesel rules in fuel
harmonization study. Clarifies LUST rulemakings and dates for
appropriations. Boutique Fuels studies clarified and made
subject to sound science. Modifications to Title headings.
(Revised) (10 minutes)
2. Dingell: Authorizes the Federal Energy Regulatory
Commission (FERC) to deter and punish fraud and manipulation in
electricity and gas markets, increases penalties for Federal
Power Act violations, authorizes FERC to refund all electricity
overcharges, does not repeal the Public Utility Holding Company
Act of 1935 (PUHCA), and directs the Securities and Exchange
Commission to review utility holding companies' status under
PUHCA to prevent them from wrongly claiming exemptions. The
amendment retains a number of valuable provisions from Title
XII, such as ``open access'' for public power entities, and
does not modify the ``native load'' provision adopted in the
Energy and Commerce Committee. The amendment retains Title
XII's electric transmission provision, including the spending
caps. (20 minutes)
3. Markey: Strikes the provisions that will allow oil and
gas exploration in the Arctic National Wildlife Refuge. (30
minutes)
4. Boehlert/Markey/Kirk/Gilchrest/Leach/Shays: Directs the
Secretary of Transportation to increase fuel economy standards
from today's average of 25 miles/gallon to 33 miles/gallon over
10 years (by 2015), consistent with the findings of the
National Academy of Sciences, in order to save 10% of the
gasoline the nation would otherwise consume by 2015. Amendment
also directs the Secretary to maximize job retention in the
American auto manufacturing sector and to prevent taking
actions that would reduce safety. (20 minutes)
5. Johnson (CT): Requires that the EPA's fuel economy test
procedures reflect current driving patterns and conditions and
provide consumers with more accurate information about fuel
economy. (10 minutes)
6. Rogers (MI)/Kilpatrick: Amendment to the Johnson of
Connecticut amendment. Directs the Administrator of the EPA to
revise certain Federal vehicle fuel economy adjustment factors
to take into consideration higher speed limits, faster
acceleration rates, variations in temperature, use of air
conditioning, shorter city test cycle lengths, and the use of
other fuel depleting features to provide consumers with
accurate fuel economy information on new vehicle labels. (10
minutes)
7. Bishop (NY)/Markey: This Democratic alternative energy
policy will help lower gas prices, increase our energy
efficiency standards, and eliminate special interest subsidies
and instead invest those resources in new technology to create
a better energy future for our children. (30 minutes)
8. Slaughter: Requires any escalator being installed in
federal buildings to be an Intermittent Escalator. In addition,
federal agencies would also be encouraged to incorporate other
escalator energy conservation measures. (10 minutes)
9. Waxman: Requires the Administration to take ``voluntary,
regulatory, and other actions'' to reduce oil demand in the
U.S. by 1 million barrels per day from projected levels by
2013. (10 minutes)
10. Oberstar: Authorizes $20 million for the Administrator
of General Services Administration to proceed with the Sun Wall
Design Project, the winning entry in a national
designcompetition sponsored jointly by the Department of Energy and the
National Renewable Energy Laboratory, to install a photovoltaic solar
electric system on the headquarters building of the Department of
Energy. (10 minutes)
11. Abercrombie: Authorizes a 3-year demonstration program
for the production of ethanol in Hawaii to parallel the
existing program for corn to show that the process can be
applicable to cane sugar and can be replicated on larger scale
once the sugar cane industry has site located and constructed
ethanol production facilities. Specifically, $8.0 million would
result in a $1.00 per gallon payment to refiners and 8.0
million gallons of ethanol fuel. (10 minutes)
12. Kaptur: Provides the Secretary of Energy the authority
to include in the Strategic Petroleum Reserve alternative
fuels, including ethanol and biodiesel and rename the reserve
the ``Strategic Fuels Reserve.'' (10 minutes)
13. Conaway: Provides that the Department of Energy, in
consultation with the Department of Labor and the Department of
lnterior, will evaluate and report on both the short term and
longer term availability of skilled workers to meet the energy
security of the United States, addressing the availability of
skilled labor at both entry level and at more senior levels in
the oil, gas, and mineral industries. (10 minutes)
14. Solis: Strikes all of Title III, Subtitle D, the
Refinery Revitalization Act. Subtitle D preempts state
regulations, relaxes public health and environmental laws for
siting of refineries, and has adverse impacts on under-served
communities. (10 minutes)
15. Udall (NM): Strikes section 631, eliminating the
proposed $10 million payment for three fiscal years to domestic
uranium producers ``to identify, test, and develop improved in
situ leaching mining technologies, including low-cost
environmental restoration technologies.'' (10 minutes)
16. Ford: Authorizes the Environmental Protection Agency to
establish a program to encourage the domestic production of
hybrid and advanced diesel vehicles. The program shall include
grants (not to exceed $300 million each of the next ten years)
to domestic automobile manufacturers to (a) encourage
production of hybrid and advanced diesel vehicles and (b)
provide consumer alternatives in the form of discounts,
rebates, etc. to purchase hybrid and advanced diesel vehicles.
(10 minutes)
17. Kaptur/Kucinich: Amends section 722, the Pilot Program
for the Department of Energy's Clean Cities Program, to
increase the number of project grants to State governments,
local governments, and metropolitan transportation authorities
from 15 to 30. Also reduces the amount of total Federal
assistance under the pilot program to anyone applicant from $20
million to $15 million. Does not increase the bill's authorized
spending level of $200 million for the pilot program. (10
minutes)
18. Millender-McDonald: Establishes a Diesel Truck Retrofit
and Fleet Modernization Program to be administered in
conjunction with the Secretary of Energy and the Administrator
of the Environmental Protection Agency. Competitive grants are
to be awarded to public agencies and/or state and local
governments and entities to implement fleet modernization
programs including installation of retrofit technologies for
diesel trucks. (10 minutes)
19. Blumenauer: Establishes within the Department of
Transportation a Conserve by Bicycling pilot program, which
would oversee up to 10 pilot projects geographically dispersed
across the country designed to conserve energy resources by
providing education and marketing tools to convert car trips to
bike trips. In addition, the projects would encourage
partnerships between stakeholders from transportation, law
enforcement, education, public health, environment, and energy
fields. Requires a report to Congress within two years of
implementation. (10 minutes)
20 Jackson-Lee: Earmarks $5 million annually for bioenergy
training and education targeted to minority and socially
disadvantaged farmers and ranchers. (10 minutes)
21. Davis, T. (VA)/Waxman: Strikes section 978, ``Improved
Coordination and Management of Civilian Science and Technology
Programs,'' which would create 2 new, Senate-confirmed
assistant secretary positions within the Department of Energy,
increasing the total number of Senate-confirmed assistant
secretaries in the Department to 8. (10 minutes)
22. Walsh: Establishes a National Priority Project
designation to be awarded annually to organizations that have
advanced the field of renewable energy technology and
contributed to North American energy independence. The
designation shall be awarded in two categories: renewable
energy generation projects; and, energy efficient and renewable
energy building projects. (10 minutes)
23. Engel: Makes producers of ``approved renewable fuels''
eligible for grants to build production facilities for
renewable fuels. In the current bill, only merchant producers
of cellulosic biomass and waste derived from ethanol are
eligible for grants. (10 minutes)
24. Israel: Requires the Comptroller General of the United
States to conduct a study on the impact of the consolidation of
gasoline wholesales (and above) on the gasoline retail market
(pricing of retail gasoline, local small business ownership and
other market impacts).The study shall be delivered back to
Congress 12 months from enactment of the legislation. (10 minutes)
25. Kucinich: Authorizes a National Academy of Sciences
study on the feasibility of mustard seed as a feedstock for
biodiesel. (10 minutes)
26. Holt: Requires the Secretary of Energy, within 2 years
of enactment, to report to Congress on the potential fuel
savings from information technology systems that help
businesses and consumers to plan their travel and avoid delays.
These systems may include, for example, web-based real time
transit information systems, congestion information systems,
car-pool information systems, parking information systems,
freight route management, and traffic management systems. (10
minutes)
27. Grijalva: Strikes section 2005 which requires the
Secretary of the Interior to suspend the collection of royalty
payments to the Treasury for offshore oil and gas production on
the Outer Continental Shelf (OCS) in the Gulf of Mexico. (10
minutes)
28. Inslee: Reduces by 50% any royalty payments, excluding
the costs of processing the rights-of-way, for wind energy
generation that otherwise would be paid to the Treasury on BLM
lands. This royalty relief provision terminates after 10 years
of enactment or after the Secretary declares there exists a
generation capacity of at least 10,000 megawatts of electricity
from renewable sources on public lands, whichever is sooner.
(10 minutes)
29. Hastings (FL): Expands the definition of environmental
justice, directs each Federal Agency to establish an office of
environmental justice, reestablishes the interagency Federal
Working Group on Environmental Justice, and requires that
Executive Order (EO) 12898 (relating to Federal actions to
address environmental justice in minority populations and low-
income populations) remain in force until changed by law. (10
minutes)
30. Castle: Strikes language in the bill (section 320 of
title III), which would preempt the authority of state and
local governments to ensure that liquefied natural gas (LNG)
facilities are sited in areas where they do not pose a threat
to public safety, and the states' authority to ensure that such
facilities are not sited in places where they pose a threat to
sensitive coastal and ocean areas. Under section 320, the
Federal Energy Regulatory Commission (FERC), would be made the
lead federal agency for LNG siting decisions, and states would
be granted only a consultative role. (10 minutes)
(Summaries derived from information provided by amendment
sponsors.)
TEXT OF AMENDMENTS MADE IN ORDER
1. An Amendment To Be Offered by Representative Barton of Texas, or His
Designee, Debatable for 10 Minutes
In the item in the table of contents relating to section 142,
strike ``cdbg'' and insert ``CDBG''.
In section 105(a)(1), strike ``Section 801(a)'' and insert
``Section 801(a)(2)''.
In section 105(a)(1), strike ``(42 U.S.C. 8287(a))'' and
insert ``(42 U.S.C. 8287(a)(2))''.
In section 105(a)(1), in the proposed subparagraph (E),
insert ``and report to the Office of Management and Budget''
after ``shall meet monthly''.
In section 105(a)(1), in the proposed subparagraph (E),
insert ``No Federal agency shall enter into a contract under
this title unless the Office of Management and Budget has
approved such contract.'' after ``contracts are not
exceeded.''.
In section 105, strike subsections (c), (d), (e), (f), and
(g), and redesignate subsection (h) as subsection (c).
In section 133(b), in the proposed subsection (f), strike
``for suspended ceiling fans,''; and strike the last sentence.
In section 133(c), in the proposed subsection (v), strike
``Suspended Ceiling Fans, Vending Machines,'' and insert
``Vending Machines'' in the subsection heading.
In section 133(c), in the proposed subsection (v), strike
``suspended ceiling fans, refrigerated bottled or canned
beverage vending machines,'' and insert ``refrigerated bottled
or canned beverage vending machines''.
In section 136, strike ``Section 327'' and insert ``Effective
3 years after the date of enactment of this Act, section 327''.
In section 136, redesignate the proposed subsection (h) as
subsection (i).
In section 136, in the proposed subsection (i)(1) (as so
redesignated by the preceding amendment), strike ``or revised''
both places it appears.
In section 148 of the bill, strike subparagraph (B) of
paragraph (1) and insert the following:
(B) in paragraph (2), by inserting
``, and, with respect to rehabilitation
and new construction of public and
assisted housing funded by HOPE VI
revitalization grants under section 24
of the United States Housing Act of
1937 (42 U.S.C. 1437v), the 2003
International Energy Conservation
Code'' after ``90.1-1989')'';
In section 148 of the bill, strike subparagraph (B) of
paragraph (2) and all that follows through the end of paragraph
(3) and insert the following:
(B) by inserting ``, and, with
respect to rehabilitation and new
construction of public and assisted
housing funded by HOPE VI
revitalization grants under section 24
of the United States Housing Act of
1937 (42 U.S.C. 1437v), the 2003
International Energy Conservation
Code'' before the period at the end;
and
(3) in subsection (c)--
(A) in the heading, by inserting ``and the
International Energy Conservation Code'' after
``Model Energy Code''; and
(B) by inserting ``, or, with respect to
rehabilitation and new construction of public
and assisted housing funded by HOPE VI
revitalization grants under section 24 of the
United States Housing Act of 1937 (42 U.S.C.
1437v), the 2003 International Energy
Conservation Code'' after ``1989''.
In section 205(a), in the proposed section 570(a)(1), strike
``Secretary'' and insert ``Administrator of General Services''.
In section 205(a), in the proposed section 570(a)(4), strike
``Secretary'' and insert ``Administrator''.
In section 205(a), in the proposed section 570(b)(1), strike
``Secretary'' and insert ``Administrator''.
In section 205(a), in the proposed section 570(b)(2), strike
``Secretary'' and insert ``Administrator''.
In section 205(a), strike ``Part 4 of title V of the National
Energy Conservation Policy Act (42 U.S.C. 8271 et seq.)'' and
insert ``Subchapter VI of chapter 31 of title 40, United States
Code,''.
In section 205(a), at the beginning of the quoted material,
strike ``SEC. 570.'' and insert ``Sec. 3177.''.
Strike section 206 (and amend the table of contents
accordingly).
Strike section 244 (and amend the table of contents
accordingly).
Strike section 245 (and amend the table of contents
accordingly).
In title III, after section 330, insert the following new
section (and amend the table of contents accordingly):
SEC. 332. NATURAL GAS MARKET REFORM.
(a) Clarification of Existing CFTC Authority.--
(1) False reporting.--Section 9(a)(2) of the
Commodity Exchange Act (7 U.S.C. 13(a)(2)) is amended
by striking ``false or misleading or knowingly
inaccurate reports'' and inserting ``knowingly false or
knowingly misleading or knowingly inaccurate reports''.
(2) Commission administrative and civil authority.--
Section 9 of the Commodity Exchange Act (7 U.S.C. 13)
is amended by redesignating subsection (f) as
subsection (e), and adding:
``(f) Commission Administrative and Civil Authority.--The
Commission may bring administrative or civil actions as
provided in this Act against any person for a violation of any
provision of this section including, but not limited to, false
reporting under subsection (a)(2).''.
(3) Effect of amendments.--The amendments made by
paragraphs (1) and (2) restate, without substantive
change, existing burden of proof provisions and
existing Commission civil enforcement authority,
respectively. These clarifying changes do not alter any
existing burden of proof or grant any new statutory
authority. The provisions of this section, as restated
herein, continue to apply to any action pending on or
commenced after the date of enactment of this Act for
any act, omission, or violation occurring before, on,
or after, such date of enactment.
(b) Fraud Authority.--Section 4b of the Commodity Exchange
Act (7 U.S.C. 6b) is amended--
(1) by redesignating subsections (b) and (c) as
subsections (c) and (d), respectively; and
(2) by striking subsection (a) and inserting the
following:
``(a) It shall be unlawful--
``(1) for any person, in or in connection with any
order to make, or the making of, any contract of sale
of any commodity for future delivery or in interstate
commerce, that is made, or to be made, on or subject to
the rules of a designated contract market, for or on
behalf of any other person; or
``(2) for any person, in or in connection with any
order to make, or the making of, any contract of sale
of any commodity for future delivery, or other
agreement, contract, or transaction subject to section
5a(g) (1) and (2) of this Act, that is made, or to be
made, for or on behalf of, or with, any other person,
other than on or subject to the rules of a designated
contract market--
``(A) to cheat or defraud or attempt to cheat
or defraud such other person;
``(B) willfully to make or cause to be made
to such other person any false report or
statement or willfully to enter or cause to be
entered for such other person any false record;
``(C) willfully to deceive or attempt to
deceive such other person by any means
whatsoever in regard to any order or contract
or the disposition or execution of any order or
contract, or in regard to any act of agency
performed, with respect to any order or
contract for or, in the case of subsection
(a)(2), with such other person; or
``(D)(i) to bucket an order if such order is
either represented by such person as an order
to be executed, or required to be executed, on
or subject to the rules of a designated
contract market; or
``(ii) to fill an order by offset against the
order or orders of any other person, or
willfully and knowingly and without the prior
consent of such other person to become the
buyer in respect to any selling order of such
other person, or become the seller in respect
to any buying order of such other person, if
such order is either represented by such person
as an order to be executed, or required to be
executed, on or subject to the rules of a
designated contract market.
``(b) Subsection (a)(2) shall not obligate any person, in
connection with a transaction in a contract of sale of a
commodity for future delivery, or other agreement, contract or
transaction subject to section 5a(g) (1) and (2) of this Act,
with another person, to disclose to such other person nonpublic
information that may be material to the market price of such
commodity or transaction, except as necessary to make any
statement made to such other person in connection with such
transaction, not misleading in any material respect.''.
(c) Jurisdiction of the CFTC.--The Natural Gas Act (15 U.S.C.
717 et seq.) is amended by adding at the end:
``SEC. 26. JURISDICTION.
``This Act shall not affect the exclusive jurisdiction of the
Commodity Futures Trading Commission with respect to accounts,
agreements, contracts, or transactions in commodities under the
Commodity Exchange Act (7 U.S.C. 1 et seq.). Any request for
information by the Commission to a designated contract market,
registered derivatives transaction execution facility, board of
trade, exchange, or market involving accounts, agreements,
contracts, or transactions in commodities (including natural
gas, electricity, and other energy commodities) within the
exclusive jurisdiction of the Commodity Futures Trading
Commission shall be directed to the Commodity Futures Trading
Commission, which shall cooperate in responding to any
information request by the Commission.''.
(d) Increased Penalties.--Section 21 of the Natural Gas Act
(15 U.S.C. 717t) is amended--
(1) in subsection (a)--
(A) by striking ``$5,000'' and inserting
``$1,000,000''; and
(B) by striking ``two years'' and inserting
``5 years''; and
(2) in subsection (b), by striking ``$500'' and
inserting ``$50,000''.
In section 441(a), in the proposed section 3105(b)(1), insert
``or equal to'' after ``projects less than''.
In section 640, strike ``Section 3110'' and insert ``Section
3110(a)''.
In section 640, in the proposed paragraph (8), strike ``Not
later than'' and insert ``To the extent appropriations are
provided in advance for this purpose or are otherwise
available, not later than''.
In section 663, at the beginning of the quoted material,
strike ``(z)'' and insert ``z.''.
In section 663, in the proposed subsection z.(1), strike
``section 922(o), (v), and (w)'' and insert ``section 922(a)(4)
and (o)''.
In section 663, in the proposed subsection z.(2)(A), strike
``, (o), (v), and (w)'' and insert ``and (o)''.
In section 722(b)(1)(B), strike ``, scooters,''.
In title VII, amend section 753 to read as follows:
SEC. 753. AVIATION FUEL CONSERVATION AND EMISSIONS.
(a) In General.--Not later than 60 days after the date of
enactment of this Act, the Administrator of the Federal
Aviation Administration and the Administrator of the
Environmental Protection Agency shall jointly initiate a study
to identify--
(1) the impact of aircraft emissions on air quality
in nonattainment areas;
(2) ways to promote fuel conservation measures for
aviation to enhance fuel efficiency and reduce
emissions; and
(3) opportunities to reduce air traffic
inefficiencies that increase fuel burn and emissions.
(b) Focus.--The study under subsection (a) shall focus on how
air traffic management inefficiencies, such as aircraft idling
at airports, result in unnecessary fuel burn and air emissions.
(c) Report.--Not later than 1 year after the date of the
initiation of the study under subsection (a), the Administrator
of the Federal Aviation Administration and the Administrator of
the Environmental Protection Agency shall jointly submit to the
Committee on Energy and Commerce and the Committee on
Transportation and Infrastructure of the House of
Representatives and the Committee on Environment and Public
Works and the Committee on Commerce, Science, and
Transportation of the Senate a report that--
(1) describes the results of the study; and
(2) includes any recommendations on ways in which
unnecessary fuel use and emissions affecting air
quality may be reduced--
(A) without adversely affecting safety and
security and increasing individual aircraft
noise; and
(B) while taking into account all aircraft
emissions and the impact of those emissions on
the human health.
(d) Risk Assessments.--Any assessment of risk to human health
and the environment prepared by the Administrator of the
Federal Aviation Administration or the Administrator of the
Environmental Protection Agency to support the report in this
section shall be based on sound and objective scientific
practices, shall consider the best available science, and shall
present the weight of the scientific evidence concerning such
risks.
In title VII, amend section 756 to read as follows:
SEC. 756. REDUCTION OF ENGINE IDLING OF HEAVY-DUTY VEHICLES.
(a) Definitions.--In this section:
(1) Administrator.--The term ``Administrator'' means
the Administrator of the Environmental Protection
Agency.
(2) Advanced truck stop electrification system.--The
term ``advanced truck stop electrification system''
means a stationary system that delivers heat, air
conditioning, electricity, or communications, and is
capable of providing verifiable and auditable evidence
of use of those services, to a heavy-duty vehicle and
any occupants of the heavy-duty vehicle with or without
relying on components mounted onboard the heavy-duty
vehicle for delivery of those services.
(3) Auxiliary power unit.--The term ``auxiliary power
unit'' means an integrated system that--
(A) provides heat, air conditioning, engine
warming, or electricity to components on a
heavy-duty vehicle; and
(B) is certified by the Administrator under
part 89 of title 40, Code of Federal
Regulations (or any successor regulation), as
meeting applicable emission standards.
(4) Heavy-duty vehicle.--The term ``heavy-duty
vehicle'' means a vehicle that--
(A) has a gross vehicle weight rating greater
than 8,500 pounds; and
(B) is powered by a diesel engine.
(5) Idle reduction technology.--The term ``idle
reduction technology'' means an advanced truck stop
electrification system, auxiliary power unit, or other
device or system of devices that--
(A) is used to reduce long-duration idling of
a heavy-duty vehicle; and
(B) allows for the main drive engine or
auxiliary refrigeration engine of a heavy-duty
vehicle to be shut down.
(6) Energy conservation technology.--the term
``energy conservation technology'' means any device,
system of devices, or equipment that improves the fuel
economy of a heavy-duty vehicle.
(7) Long-duration idling.--
(A) In general.--The term ``long-duration
idling'' means the operation of a main drive
engine or auxiliary refrigeration engine of a
heavy-duty vehicle, for a period greater than
15 consecutive minutes, at a time at which the
main drive engine is not engaged in gear.
(B) Exclusions.--The term ``long-duration
idling'' does not include the operation of a
main drive engine or auxiliary refrigeration
engine of a heavy-duty vehicle during a routine
stoppage associated with traffic movement or
congestion.
(b) Idle Reduction Technology Benefits, Programs, and
Studies.--
(1) In general.--Not later than 90 days after the
date of enactment of this Act, the Administrator
shall--
(A)(i) commence a review of the mobile source
air emission models of the Environmental
Protection Agency used under the Clean Air Act
(42 U.S.C. 7401 et seq.) to determine whether
the models accurately reflect the emissions
resulting from long-duration idling of heavy-
duty vehicles and other vehicles and engines;
and
(ii) update those models as the Administrator
determines to be appropriate; and
(B)(i) commence a review of the emission
reductions achieved by the use of idle
reduction technology; and
(ii) complete such revisions of the
regulations and guidance of the Environmental
Protection Agency as the Administrator
determines to be appropriate.
(2) Deadline for completion.--Not later than 180 days
after the date of enactment of this Act, the
Administrator shall--
(A) complete the reviews under subparagraphs
(A)(i) and (B)(i) of paragraph (1); and
(B) prepare and make publicly available 1 or
more reports on the results of the reviews.
(3) Discretionary inclusions.--The reviews under
subparagraphs (A)(i) and (B)(i) of paragraph (1) and
the reports under paragraph (2)(B) may address the
potential fuel savings resulting from use of idle
reduction technology.
(4) Idle reduction and energy conservation deployment
program.--
(A) Establishment.--
(i) In general.--Not later than 90
days after the date of enactment of
this Act, the Administrator, in
consultation with the Secretary of
Transportation shall, through the
Environmental Protection Agency's
SmartWay Transport Partnership,
establish a program to support
deployment of idle reduction and energy
conservation technologies .
(ii) Priority.--The Administrator
shall give priority to the deployment
of idle reduction and energy
conservation technologies based on the
costs and beneficial effects on air
quality and ability to lessen the
emission of criteria air pollutants.
(B) Funding.--
(i) Authorization of
appropriations.--There are authorized
to be appropriated to the Administrator
to carry out subparagraph (A)
$19,500,000 for fiscal year 2006,
$30,000,000 for fiscal year 2007, and
$45,000,000 for fiscal year 2008.
(ii) Cost sharing.--Subject to clause
(iii), the Administrator shall require
at least 50 percent of the costs
directly and specifically related to
any project under this section to be
provided from non-Federal sources.
(iii) Necessary and appropriate
reductions.--The Administrator may
reduce the non-Federal requirement
under clause (ii) if the Administrator
determines that the reduction is
necessary and appropriate to meet the
objectives of this section.
(5) Idling location study.--
(A) In general.--Not later than 90 days after
the date of enactment of this Act, the
Administrator, in consultation with the
Secretary of Transportation, shall commence a
study to analyze all locations at which heavy-
duty vehicles stop for long-duration idling,
including--
(i) truck stops;
(ii) rest areas;
(iii) border crossings;
(iv) ports;
(v) transfer facilities; and
(vi) private terminals.
(B) Deadline for completion.--Not later than
180 days after the date of enactment of this
Act, the Administrator shall--
(i) complete the study under
subparagraph (A); and
(ii) prepare and make publicly
available 1 or more reports of the
results of the study.
(c) Vehicle Weight Exemption.--Section 127(a) of title 23,
United States Code, is amended--
(1) by designating the first through eleventh
sentences as paragraphs (1) through (11), respectively;
and
(2) by adding at the end the following:
``(12) Heavy duty vehicles.--
``(A) In general.--Subject to subparagraphs
(B) and (C), in order to promote reduction of
fuel use and emissions because of engine
idling, the maximum gross vehicle weight limit
and the axle weight limit for any heavy-duty
vehicle equipped with an idle reduction
technology shall be increased by a quantity
necessary to compensate for the additional
weight of the idle reduction system.
``(B) Maximum weight increase.--The weight
increase under subparagraph (A) shall be not
greater than 400 pounds.
``(C) Proof.--On request by a regulatory
agency or law enforcement agency, the vehicle
operator shall provide proof (through
demonstration or certification) that--
``(i) the idle reduction technology
is fully functional at all times; and
``(ii) the 400-pound gross weight
increase is not used for any purpose
other than the use of idle reduction
technology described in subparagraph
(A).''.
(d) Report.--Not later than 60 days after the date on which
funds are initially awarded under this section, and on an
annual basis thereafter, the Administrator shall submit to
Congress a report containing--
(1) an identification of the grant recipients, a
description of the projects to be funded and the amount
of funding provided; and
(2) an identification of all other applicants that
submitted applications under the program.
In title VIII, after section 810, insert the following and
make the necessary conforming changes in the table of contents:
SEC. 811. HYDROGEN FUEL CELL BUSES.
The Secretary of Energy, through the advanced vehicle
technologies program, in coordination with the Secretary of
Transportation, shall advance the development of fuel cell bus
technologies by providing funding for 4 demonstration sites
that--
(1) have or will soon have hydrogen infrastructure
for fuel cell bus operation; and
(2) are operated by entities with experience in the
development of fuel cell bus technologies, to enable
the widespread utilization of fuel cell buses.
Such demonstrations shall address the reliability of fuel cell
heavy-duty vehicles, expense, infrastructure, containment,
storage, safety, training, and other issues.
In title IX, subtitle F, chapter 1, add at the end the
following new sections:
SEC. 968A. WESTERN MICHIGAN DEMONSTRATION PROJECT.
The Administrator of the Environmental Protection Agency, in
consultation with the State of Michigan and affected local
officials, shall conduct a demonstration project to address the
effect of transported ozone and ozone precursors in
Southwestern Michigan. The demonstration program shall address
projected nonattainment areas in Southwestern Michigan that
include counties with design values for ozone of less than .095
based on years 2000 to 2002 or the most current 3-year period
of air quality data. The Administrator shall assess any
difficulties such areas may experience in meeting the 8 hour
national ambient air quality standard for ozone due to the
effect of transported ozone or ozone precursors into the areas.
The Administrator shall work with State and local officials to
determine the extent of ozone and ozone precursor transport, to
assess alternatives to achieve compliance with the 8 hour
standard apart from local controls, and to determine the
timeframe in which such compliance could take place. The
Administrator shall complete this demonstration project no
later than 2 years after the date of enactment of this section
and shall not impose any requirement or sanction that might
otherwise apply during the pendency of the demonstration
project.
SEC. 968B. WESTERN HEMISPHERE ENERGY COOPERATION.
(a) Program.--The Secretary shall carry out a program to
promote cooperation on energy issues with Western Hemisphere
countries.
(b) Activities.--Under the program, the Secretary shall fund
activities to work with Western Hemisphere countries to--
(1) assist the countries in formulating and adopting
changes in economic policies and other policies to--
(A) increase the production of energy
supplies; and
(B) improve energy efficiency; and
(2) assist in the development and transfer of energy
supply and efficiency technologies that would have a
beneficial impact on world energy markets.
(c) University Participation.--To the extent practicable, the
Secretary shall carry out the program under this section with
the participation of universities so as to take advantage of
the acceptance of universities by Western Hemisphere countries
as sources of unbiased technical and policy expertise when
assisting the Secretary in--
(1) evaluating new technologies;
(2) resolving technical issues;
(3) working with those countries in the development
of new policies; and
(4) training policymakers, particularly in the case
of universities that involve the participation of
minority students, such as Hispanic-serving
institutions and Historically Black Colleges and
Universities.
(d) Authorization of Appropriations.--There are authorized to
be appropriated to carry out this section--
(1) $8,000,000 for fiscal year 2006;
(2) $10,000,000 for fiscal year 2007;
(3) $13,000,000 for fiscal year 2008;
(4) $16,000,000 for fiscal year 2009; and
(5) $19,000,000 for fiscal year 2010.
SEC. 968C. ARCTIC ENGINEERING RESEARCH CENTER.
(a) In General.--The Secretary of Energy (referred to in this
section as the ``Secretary'') in consultation with the
Secretary of Transportation and the United States Arctic
Research Commission shall provide annual grants to a university
located adjacent to the Arctic Energy Office of the Department
of Energy, to establish and operate a university research
center to be headquartered in Fairbanks and to be known as the
``Arctic Engineering Research Center'' (referred to in this
section as the ``Center'').
(b) Purpose.--The purpose of the Center shall be to conduct
research on, and develop improved methods of, construction and
use of materials to improve the overall performance of roads,
bridges, residential, commercial, and industrial structures,
and other infrastructure in the Arctic region, with an emphasis
on developing--
(1) new construction techniques for roads, bridges,
rail, and related transportation infrastructure and
residential, commercial, and industrial infrastructure
that are capable of withstanding the Arctic environment
and using limited energy resources as efficiently as
possible;
(2) technologies and procedures for increasing road,
bridge, rail, and related transportation infrastructure
and residential, commercial, and industrial
infrastructure safety, reliability, and integrity in
the Arctic region;
(3) new materials and improving the performance and
energy efficiency of existing materials for the
construction of roads, bridges, rail, and related
transportation infrastructure and residential,
commercial, and industrial infrastructure in the Arctic
region; and
(4) recommendations for new local, regional, and
State permitting and building codes to ensure
transportation and building safety and efficient energy
use when constructing, using, and occupying such
infrastructure in the Arctic region.
(c) Objectives.--The Center shall carry out--
(1) basic and applied research in the subjects
described in subsection (b), the products of which
shall be judged by peers or other experts in the field
to advance the body of knowledge in road, bridge, rail,
and infrastructure engineering in the Arctic region;
and
(2) an ongoing program of technology transfer that
makes research results available to potential users in
a form that can be implemented.
(d) Amount of Grant.--For each of fiscal years 2006 through
2011, the Secretary shall provide a grant in the amount of
$3,000,000 to the institution specified in subsection (a) to
carry out this section.
(e) Authorization of Appropriations.--There are authorized to
be appropriated to carry out this section $3,000,000 for each
of fiscal years 2006 through 2011.
SEC. 968D. BARROW GEOPHYSICAL RESEARCH FACILITY.
(a) Establishment.--The Secretary of Commerce, in
consultation with the Secretaries of Energy and the Interior,
the Director of the National Science Foundation, and the
Administrator of the Environmental Protection Agency, shall
establish a joint research facility in Barrow, Alaska, to be
known as the ``Barrow Geophysical Research Facility'', to
support scientific research activities in the Arctic.
(b) Authorization of Appropriations.--There are authorized to
be appropriated to the Secretaries of Commerce, Energy, and the
Interior, the Director of the National Science Foundation, and
the Administrator of the Environmental Protection Agency for
the planning, design, construction, and support of the Barrow
Geophysical Research Facility $61,000,000.
In section 970(d), amend paragraph (3) to read as follows:
(3) Requirement of section 501(c)(3) status.--The
Secretary shall not select a consortium under this
section unless such consortium is an organization
described in section 501(c)(3) of the Internal Revenue
Code of 1986 and exempt from tax under such section
501(a) of such Code.
In section 1236, adding a new section 217 to the Federal
Power Act, insert a period before the final closing quotation
marks.
In section 1252(a) and in section 1252(b), strike ``Public
Utilities'' and insert ``Public Utility''.
In section 1254(b)(1), in the amendment to section 112(b) of
the Public Utility Regulatory Policies Act of 1978, strike
``(3)(A)'' and insert ``(5)(A)''.
In section 1254(b)(2), strike ``112(d) f'' and insert
``112(d) of''.
In title XII, in section 1274(a), after ``for'' strike
``section'' and insert ``sections 1269 (relating to effect on
other regulations), 1270 (relating to enforcement), 1271
(relating to savings provisions), and''.
In title XII, amend section 1298 to read as follows:
SEC. 1298. ECONOMIC DISPATCH.
Part II of the Federal Power Act (16 U.S.C. 824 et seq.) is
amended by adding at the end the following:
``SEC. 223. JOINT BOARDS ON ECONOMIC DISPATCH.
``(a) In General.--The Commission shall convene joint boards
on a regional basis pursuant to section 209 of this Act to
study the issue of security constrained economic dispatch for
the various market regions. The Commission shall designate the
appropriate regions to be covered by each such joint board for
purposes of this section.
``(b) Membership.--The Commission shall request each State to
nominate a representative for the appropriate regional joint
board, and shall designate a member of the Commission to chair
and participate as a member of each such board.
``(c) Powers.--The sole authority of each joint board
convened under this section shall be to consider issues
relevant to what constitutes `security constrained economic
dispatch' and how such a mode of operating an electric energy
system affects or enhances the reliability and affordability of
service to customers in the region concerned and to make
recommendations to the Commission regarding such issues.
``(d) Report to the Congress.--Within one year after
enactment of this section, the Commission shall issue a report
and submit such report to the Congress regarding the
recommendations of the joint boards under this section and the
Commission may consolidate the recommendations of more than one
such regional joint board, including any consensus
recommendations for statutory or regulatory reform.''.
In section 1443, in the amendment adding subsection (d) to
section 181 of the Clean Air Act, in paragraph (4), strike
``If, no more than 18 months prior to the date of enactment of
this subsection'' and insert ``If, after April 1, 2003'' and
strike ``within 12 months after the date of enactment of this
subsection''.
In title XIV, in section 1446, strike ``as defined under
section 2(a)(1)(A)'' and insert ``identified under section
2(a)(1)(B)'' and strike ``2720(a)(1)(A)'' and insert
``2720(a)(1)(B)''.
In title XV, in section 1505(a), strike ``The review shall be
completed no later than May 31, 2014'' and insert ``The review
shall commence after May 31, 2013, and shall be completed no
later than May 31, 2014''.
In section 1505(b), strike ``No later'' and insert ``After
completion of the review under subsection (a) and no later''.
In section 1510, in subparagraph (G) of subsection (a)(2),
after ``vehicle emission systems,'' insert ``on-road and off-
road diesel rules,'' and after ``imposed by'' insert ``the
Federal Government,''.
In section 1510(b)(1), strike ``2007'' and insert ``2009''.
In title XV, in section 1530, in subsection (a) adding a new
subsection (i) to section 9003 of the Solid Waste Disposal Act,
strike subparagraph (G) of paragraph (1) of such new subsection
(i) and insert a period at the end of subsection (b).
In title XV, in section 1531, in the amendment adding new
section 9014 to the Solid Waste Disposal Act, in paragraph
(2)(C) strike ``9004(f)'' and insert ``9003(i), 9004(f),'' and
in paragraph (2)(D) strike ``9011 and 9012'' and insert ``9010,
9011, 9012, and 9013''.
In section 1541(c)(2), strike ``preserves air quality
standards'' and insert ``addresses air quality requirements''.
In section 1541(c)(2), strike ``that results'' and insert
``including that which has resulted''.
In section 1541(c), insert the following new paragraph after
paragraph (2) and redesignate the following paragraphs
accordingly:
(3) Conduct of study.--In carrying out their joint
duties under this section, the Administrator and the
Secretary shall use sound science and objective science
practices, shall consider the best available science,
shall use data collected by accepted means and shall
consider and include a description of the weight of the
scientific evidence. The Administrator and the
Secretary shall coordinate the study required by this
section with other studies required by the act and
shall endeavor to avoid duplication of effort with
regard to such studies.
In section 1541(c)(4) (as redesignated by the preceding
amendment), strike the sentence beginning with ``The
Administrator shall use sound''.
In the heading of title XVII, insert ``--RESOURCES'' at the
end (and amend the table of contents accordingly).
In the heading of title XIX, insert ``--RESOURCES'' at the
end (and amend the table of contents accordingly).
Strike section 2026 (and amend the table of contents
accordingly).
In the heading of title XXI, insert ``--RESOURCES'' at the
end (and amend the table of contents accordingly).
Redesignate title XXV as title XXIV, and redesignate sections
2501 through 2506 as sections 2401 through 2406, respectively
(and amend the table of contents accordingly).
Redesignate section 2601 as section 2055, and move it to the
end of subtitle D of title XX.
Redesignate section 2602 as section 112, and move it to the
end of subtitle A of title I.
Strike the remainder of title XXVI.
----------
2. An Amendment To Be Offered by Representative Dingell of Michigan, or
His Designee, Debatable for 20 Minutes
Title XII of H.R. 6 is amended by striking sections 1201
through 1235 and sections 1237 through 1298, by striking the
title heading, by inserting the following before title XIII, by
redesignating section 1236 (relating to native load service
obligation) as section 1233 of the following and inserting such
redesignated section 1233 after section 1232 of the following,
and by making the necessary conforming changes in the table of
contents:
TITLE XII--ELECTRICITY
SECTION 1201. SHORT TITLE.
This title may be cited as the ``Electric Reliability Act of
2005''.
Subtitle A--Reliability Standards
SEC. 1211. ELECTRIC RELIABILITY STANDARDS.
(a) In General.--Part II of the Federal Power Act (16 U.S.C
824 et seq.) is amended by adding at the end the following:
``SEC. 215. ELECTRIC RELIABILITY.
``(a) Definitions.--For purposes of this section:
``(1) The term `bulk-power system' means--
``(A) facilities and control systems
necessary for operating an interconnected
electric energy transmission network (or any
portion thereof); and
``(B) electric energy from generation
facilities needed to maintain transmission
system reliability.
The term does not include facilities used in the local
distribution of electric energy.
``(2) The terms `Electric Reliability Organization'
and `ERO' mean the organization certified by the
Commission under subsection (c) the purpose of which is
to establish and enforce reliability standards for the
bulk-power system, subject to Commission review.
``(3) The term `reliability standard' means a
requirement, approved by the Commission under this
section, to provide for reliable operation of the bulk-
power system. The term includes requirements for the
operation of existing bulk-power system facilities and
the design of planned additions or modifications to
such facilities to the extent necessary to provide for
reliable operation of the bulk-power system, but the
term does not include any requirement to enlarge such
facilities or to construct new transmission capacity or
generation capacity.
``(4) The term `reliable operation' means operating
the elements of the bulk-power system within equipment
and electric system thermal, voltage, and stability
limits so that instability, uncontrolled separation, or
cascading failures of such system will not occur as a
result of a sudden disturbance or unanticipated failure
of system elements.
``(5) The term `Interconnection' means a geographic
area in which the operation of bulk-power system
components is synchronized such that the failure of 1
or more of such components may adversely affect the
ability of the operators of other components within the
system to maintain reliable operation of the facilities
within their control.
``(6) The term `transmission organization' means a
Regional Transmission Organization, Independent System
Operator, independent transmission provider, or other
transmission organization finally approved by the
Commission for the operation of transmission
facilities.
``(7) The term `regional entity' means an entity
having enforcement authority pursuant to subsection
(e)(4).
``(b) Jurisdiction and Applicability.--(1) The Commission
shall have jurisdiction, within the United States, over the ERO
certified by the Commission under subsection (c), any regional
entities, and all users, owners and operators of the bulk-power
system, including but not limited to the entities described in
section 201(f), for purposes of approving reliability standards
established under this section and enforcing compliance with
this section. All users, owners and operators of the bulk-power
system shall comply with reliability standards that take effect
under this section.
``(2) The Commission shall issue a final rule to implement
the requirements of this section not later than 180 days after
the date of enactment of this section.
``(c) Certification.--Following the issuance of a Commission
rule under subsection (b)(2), any person may submit an
application to the Commission for certification as the Electric
Reliability Organization. The Commission may certify 1 such ERO
if the Commission determines that such ERO--
``(1) has the ability to develop and enforce, subject
to subsection (e)(2), reliability standards that
provide for an adequate level of reliability of the
bulk-power system; and
``(2) has established rules that--
``(A) assure its independence of the users
and owners and operators of the bulk-power
system, while assuring fair stakeholder
representation in the selection of its
directors and balanced decisionmaking in any
ERO committee or subordinate organizational
structure;
``(B) allocate equitably reasonable dues,
fees, and other charges among end users for all
activities under this section;
``(C) provide fair and impartial procedures
for enforcement of reliability standards
through the imposition of penalties in
accordance with subsection (e) (including
limitations on activities, functions, or
operations, or other appropriate sanctions);
``(D) provide for reasonable notice and
opportunity for public comment, due process,
openness, and balance of interests in
developing reliability standards and otherwise
exercising its duties; and
``(E) provide for taking, after
certification, appropriate steps to gain
recognition in Canada and Mexico.
The total amount of all dues, fees, and other charges
collected by the ERO in each of the fiscal years 2006
through 2015 and allocated under subparagraph (B) shall
not exceed $50,000,000.
``(d) Reliability Standards.--(1) The Electric Reliability
Organization shall file each reliability standard or
modification to a reliability standard that it proposes to be
made effective under this section with the Commission.
``(2) The Commission may approve, by rule or order, a
proposed reliability standard or modification to a reliability
standard if it determines that the standard is just,
reasonable, not unduly discriminatory or preferential, and in
the public interest. The Commission shall give due weight to
the technical expertise of the Electric Reliability
Organization with respect to the content of a proposed standard
or modification to a reliability standard and to the technical
expertise of a regional entity organized on an Interconnection-
wide basis with respect to a reliability standard to be
applicable within that Interconnection, but shall not defer
with respect to the effect of a standard on competition. A
proposed standard or modification shall take effect upon
approval by the Commission.
``(3) The Electric Reliability Organization shall rebuttably
presume that a proposal from a regional entity organized on an
Interconnection-wide basis for a reliability standard or
modification to a reliability standard to be applicable on an
Interconnection-wide basis is just, reasonable, and not unduly
discriminatory or preferential, and in the public interest.
``(4) The Commission shall remand to the Electric Reliability
Organization for further consideration a proposed reliability
standard or a modification to a reliability standard that the
Commission disapproves in whole or in part.
``(5) The Commission, upon its own motion or upon complaint,
may order the Electric Reliability Organization to submit to
the Commission a proposed reliability standard or a
modification to a reliability standard that addresses a
specific matter if the Commission considers such a new or
modified reliability standard appropriate to carry out this
section.
``(6) The final rule adopted under subsection (b)(2) shall
include fair processes for the identification and timely
resolution of any conflict between a reliability standard and
any function, rule, order, tariff, rate schedule, or agreement
accepted, approved, or ordered by the Commission applicable to
a transmission organization. Such transmission organization
shall continue to comply with such function, rule, order,
tariff, rate schedule or agreement accepted approved, or
ordered by the Commission until--
``(A) the Commission finds a conflict exists between
a reliability standard and any such provision;
``(B) the Commission orders a change to such
provision pursuant to section 206 of this part; and
``(C) the ordered change becomes effective under this
part.
If the Commission determines that a reliability standard needs
to be changed as a result of such a conflict, it shall order
the ERO to develop and file with the Commission a modified
reliability standard under paragraph (4) or (5) of this
subsection.
``(e) Enforcement.--(1) The ERO may impose, subject to
paragraph (2), a penalty on a user or owner or operator of the
bulk-power system for a violation of a reliability standard
approved by the Commission under subsection (d) if the ERO,
after notice and an opportunity for a hearing--
``(A) finds that the user or owner or operator has
violated a reliability standard approved by the
Commission under subsection (d); and
``(B) files notice and the record of the proceeding
with the Commission.
``(2) A penalty imposed under paragraph (1) may take effect
not earlier than the 31st day after the ERO files with the
Commission notice of the penalty and the record of proceedings.
Such penalty shall be subject to review by the Commission, on
its own motion or upon application by the user, owner or
operator that is the subject of the penalty filed within 30
days after the date such notice is filed with the Commission.
Application to the Commission for review, or the initiation of
review by the Commission on its own motion, shall not operate
as a stay of such penalty unless the Commission otherwise
orders upon its own motion or upon application by the user,
owner or operator that is the subject of such penalty. In any
proceeding to review a penalty imposed under paragraph (1), the
Commission, after notice and opportunity for hearing (which
hearing may consist solely of the record before the ERO and
opportunity for the presentation of supporting reasons to
affirm, modify, or set aside the penalty), shall by order
affirm, set aside, reinstate, or modify the penalty, and, if
appropriate, remand to the ERO for further proceedings. The
Commission shall implement expedited procedures for such
hearings.
``(3) On its own motion or upon complaint, the Commission may
order compliance with a reliability standard and may impose a
penalty against a user or owner or operator of the bulk-power
system if the Commission finds, after notice and opportunity
for a hearing, that the user or owner or operator of the bulk-
power system has engaged or is about to engage in any acts or
practices that constitute or will constitute a violation of a
reliability standard.
``(4) The Commission shall issue regulations authorizing the
ERO to enter into an agreement to delegate authority to a
regional entity for the purpose of proposing reliability
standards to the ERO and enforcing reliability standards under
paragraph (1) if--
``(A) the regional entity is governed by--
``(i) an independent board;
``(ii) a balanced stakeholder board; or
``(iii) a combination independent and
balanced stakeholder board.
``(B) the regional entity otherwise satisfies the
provisions of subsection (c)(1) and (2); and
``(C) the agreement promotes effective and efficient
administration of bulk-power system reliability.
The Commission may modify such delegation. The ERO and the
Commission shall rebuttably presume that a proposal for
delegation to a regional entity organized on an
Interconnection-wide basis promotes effective and efficient
administration of bulk-power system reliability and should be
approved. Such regulation may provide that the Commission may
assign the ERO's authority to enforce reliability standards
under paragraph (1) directly to a regional entity consistent
with the requirements of this paragraph.
``(5) The Commission may take such action as is necessary or
appropriate against the ERO or a regional entity to ensure
compliance with a reliability standard or any Commission order
affecting the ERO or a regional entity.
``(6) Any penalty imposed under this section shall bear a
reasonable relation to the seriousness of the violation and
shall take into consideration the efforts of such user, owner,
or operator to remedy the violation in a timely manner.
``(f) Changes in Electric Reliability Organization Rules.--
The Electric Reliability Organization shall file with the
Commission for approval any proposed rule or proposed rule
change, accompanied by an explanation of its basis and purpose.
The Commission, upon its own motion or complaint, may propose a
change to the rules of the ERO. A proposed rule or proposed
rule change shall take effect upon a finding by the Commission,
after notice and opportunity for comment, that the change is
just, reasonable, not unduly discriminatory or preferential, is
in the public interest, and satisfies the requirements of
subsection (c).
``(g) Reliability Reports.--The ERO shall conduct periodic
assessments of the reliability and adequacy of the bulk-power
system in North America.
``(h) Coordination With Canada and Mexico.--The President is
urged to negotiate international agreements with the
governments of Canada and Mexico to provide for effective
compliance with reliability standards and the effectiveness of
the ERO in the United States and Canada or Mexico.
``(i) Savings Provisions.--(1) The ERO shall have authority
to develop and enforce compliance with reliability standards
for only the bulk-power system.
``(2) This section does not authorize the ERO or the
Commission to order the construction of additional generation
or transmission capacity or to set and enforce compliance with
standards for adequacy or safety of electric facilities or
services.
``(3) Nothing in this section shall be construed to preempt
any authority of any State to take action to ensure the safety,
adequacy, and reliability of electric service within that
State, as long as such action is not inconsistent with any
reliability standard, except that the State of New York may
establish rules that result in greater reliability within that
State, as long as such action does not result in lesser
reliability outside the State than that provided by the
reliability standards..
``(4) Within 90 days of the application of the Electric
Reliability Organization or other affected party, and after
notice and opportunity for comment, the Commission shall issue
a final order determining whether a State action is
inconsistent with a reliability standard, taking into
consideration any recommendation of the ERO.
``(5) The Commission, after consultation with the ERO and the
State taking action, may stay the effectiveness of any State
action, pending the Commission's issuance of a final order.
``(j) Regional Advisory Bodies.--The Commission shall
establish a regional advisory body on the petition of at least
\2/3\ of the States within a region that have more than \1/2\
of their electric load served within the region. A regional
advisory body shall be composed of 1 member from each
participating State in the region, appointed by the Governor of
each State, and may include representatives of agencies,
States, and provinces outside the United States. A regional
advisory body may provide advice to the Electric Reliability
Organization, a regional entity, or the Commission regarding
the governance of an existing or proposed regional entity
within the same region, whether a standard proposed to apply
within the region is just, reasonable, not unduly
discriminatory or preferential, and in the public interest,
whether fees proposed to be assessed within the region are
just, reasonable, not unduly discriminatory or preferential,
and in the public interest and any other responsibilities
requested by the Commission. The Commission may give deference
to the advice of any such regional advisory body if that body
is organized on an Interconnection-wide basis.
``(k) Alaska and Hawaii.--The provisions of this section do
not apply to Alaska or Hawaii.''.
(b) Status of ERO.--The Electric Reliability Organization
certified by the Federal Energy Regulatory Commission under
section 215(c) of the Federal Power Act and any regional entity
delegated enforcement authority pursuant to section 215(e)(4)
of that Act are not departments, agencies, or instrumentalities
of the United States Government.
(c) Limitation on Annual Appropriations.--There is authorized
to be appropriated not mroe than $50,000,000 per year for
fiscal years 2006 through 2015 for all activities under the
amendment made by subsection (a).
Subtitle B--Transmission Operation Improvements
SEC. 1231. OPEN NONDISCRIMINATORY ACCESS.
Part II of the Federal Power Act (16 U.S.C. 824 et seq.) is
amended by inserting after section 211 the following new
section:
``SEC. 211A. OPEN ACCESS BY UNREGULATED TRANSMITTING UTILITIES.
``(a) Transmission Services.--Subject to section 212(h), the
Commission may, by rule or order, require an unregulated
transmitting utility to provide transmission services--
``(1) at rates that are comparable to those that the
unregulated transmitting utility charges itself; and
``(2) on terms and conditions (not relating to rates)
that are comparable to those under which such
unregulated transmitting utility provides transmission
services to itself and that are not unduly
discriminatory or preferential.
``(b) Exemption.--The Commission shall exempt from any rule
or order under this section any unregulated transmitting
utility that--
``(1) sells no more than 4,000,000 megawatt hours of
electricity per year; or
``(2) does not own or operate any transmission
facilities that are necessary for operating an
interconnected transmission system (or any portion
thereof); or
``(3) meets other criteria the Commission determines
to be in the public interest.
``(c) Local Distribution Facilities.--The requirements of
subsection (a) shall not apply to facilities used in local
distribution.
``(d) Exemption Termination.--Whenever the Commission, after
an evidentiary hearing held upon a complaint and after giving
consideration to reliability standards established under
section 215, finds on the basis of a preponderance of the
evidence that any exemption granted pursuant to subsection (b)
unreasonably impairs the continued reliability of an
interconnected transmission system, it shall revoke the
exemption granted to that transmitting utility.
``(e) Application to Unregulated Transmitting Utilities.--The
rate changing procedures applicable to public utilities under
subsections (c) and (d) of section 205 are applicable to
unregulated transmitting utilities for purposes of this
section.
``(f) Remand.--In exercising its authority under paragraph
(1) of subsection (a), the Commission may remand transmission
rates to an unregulated transmitting utility for review and
revision where necessary to meet the requirements of subsection
(a).
``(g) Other Requests.--The provision of transmission services
under subsection (a) does not preclude a request for
transmission services under section 211.
``(h) Limitation.--The Commission may not require a State or
municipality to take action under this section that would
violate a private activity bond rule for purposes of section
141 of the Internal Revenue Code of 1986 (26 U.S.C. 141).
``(i) Transfer of Control of Transmitting Facilities.--
Nothing in this section authorizes the Commission to require an
unregulated transmitting utility to transfer control or
operational control of its transmitting facilities to an RTO or
any other Commission-approved independent transmission
organization designated to provide nondiscriminatory
transmission access.
``(j) Definition.--For purposes of this section, the term
`unregulated transmitting utility' means an entity that--
``(1) owns or operates facilities used for the
transmission of electric energy in interstate commerce;
and
``(2) is an entity described in section 201(f).''.
SEC. 1232. FEDERAL UTILITY PARTICIPATION IN REGIONAL TRANSMISSION
ORGANIZATIONS.
(a) Definitions.--For purposes of this section--
(1) Appropriate federal regulatory authority.--The
term ``appropriate Federal regulatory authority''
means--
(A) with respect to a Federal power marketing
agency (as defined in the Federal Power Act),
the Secretary of Energy, except that the
Secretary may designate the Administrator of a
Federal power marketing agency to act as the
appropriate Federal regulatory authority with
respect to the transmission system of that
Federal power marketing agency; and
(B) with respect to the Tennessee Valley
Authority, the Board of Directors of the
Tennessee Valley Authority.
(2) Federal utility.--The term ``Federal utility''
means a Federal power marketing agency or the Tennessee
Valley Authority.
(3) Transmission system.--The term ``transmission
system'' means electric transmission facilities owned,
leased, or contracted for by the United States and
operated by a Federal utility.
(b) Transfer.--The appropriate Federal regulatory authority
is authorized to enter into a contract, agreement or other
arrangement transferring control and use of all or part of the
Federal utility's transmission system to an RTO or ISO (as
defined in the Federal Power Act), approved by the Federal
Energy Regulatory Commission. Such contract, agreement or
arrangement shall include--
(1) performance standards for operation and use of
the transmission system that the head of the Federal
utility determines necessary or appropriate, including
standards that assure recovery of all the Federal
utility's costs and expenses related to the
transmission facilities that are the subject of the
contract, agreement or other arrangement; consistency
with existing contracts and third-party financing
arrangements; and consistency with said Federal
utility's statutory authorities, obligations, and
limitations;
(2) provisions for monitoring and oversight by the
Federal utility of the RTO's or ISO's fulfillment of
the terms and conditions of the contract, agreement or
other arrangement, including a provision for the
resolution of disputes through arbitration or other
means with the regional transmission organization or
with other participants, notwithstanding the
obligations and limitations of any other law regarding
arbitration; and
(3) a provision that allows the Federal utility to
withdraw from the RTO or ISO and terminate the
contract, agreement or other arrangement in accordance
with its terms.
Neither this section, actions taken pursuant to it, nor any
other transaction of a Federal utility using an RTO or ISO
shall confer upon the Federal Energy Regulatory Commission
jurisdiction or authority over the Federal utility's electric
generation assets, electric capacity or energy that the Federal
utility is authorized by law to market, or the Federal
utility's power sales activities.
(c) Existing Statutory and Other Obligations.--
(1) System operation requirements.--No statutory
provision requiring or authorizing a Federal utility to
transmit electric power or to construct, operate or
maintain its transmission system shall be construed to
prohibit a transfer of control and use of its
transmission system pursuant to, and subject to all
requirements of subsection (b).
(2) Other obligations.--This subsection shall not be
construed to--
(A) suspend, or exempt any Federal utility
from, any provision of existing Federal law,
including but not limited to any requirement or
direction relating to the use of the Federal
utility's transmission system, environmental
protection, fish and wildlife protection, flood
control, navigation, water delivery, or
recreation; or
(B) authorize abrogation of any contract or
treaty obligation.
(3) Repeal.--Section 311 of title III of Appendix B
of the Act of October 27, 2000 (P.L. 106-377, section
1(a)(2); 114 Stat. 1441, 1441A-80; 16 U.S.C. 824n) is
repealed.
Subtitle C--Amendments to PURPA
SEC. 1251. NET METERING AND ADDITIONAL STANDARDS.
(a) Adoption of Standards.--Section 111(d) of the Public
Utility Regulatory Policies Act of 1978 (16 U.S.C. 2621(d)) is
amended by adding at the end the following:
``(11) Net metering.--Each electric utility shall
make available upon request net metering service to any
electric consumer that the electric utility serves. For
purposes of this paragraph, the term `net metering
service' means service to an electric consumer under
which electric energy generated by that electric
consumer from an eligible on-site generating facility
and delivered to the local distribution facilities may
be used to offset electric energy provided by the
electric utility to the electric consumer during the
applicable billing period.
``(12) Fuel sources.--Each electric utility shall
develop a plan to minimize dependence on 1 fuel source
and to ensure that the electric energy it sells to
consumers is generated using a diverse range of fuels
and technologies, including renewable technologies.
``(13) Fossil fuel generation efficiency.--Each
electric utility shall develop and implement a 10-year
plan to increase the efficiency of its fossil fuel
generation.''.
(b) Compliance.--
(1) Time limitations.--Section 112(b) of the Public
Utility Regulatory Policies Act of 1978 (16 U.S.C.
2622(b)) is amended by adding at the end the following:
``(3)(A) Not later than 2 years after the enactment of this
paragraph, each State regulatory authority (with respect to
each electric utility for which it has ratemaking authority)
and each nonregulated electric utility shall commence the
consideration referred to in section 111, or set a hearing date
for such consideration, with respect to each standard
established by paragraphs (11) through (13) of section 111(d).
``(B) Not later than 3 years after the date of the enactment
of this paragraph, each State regulatory authority (with
respect to each electric utility for which it has ratemaking
authority), and each nonregulated electric utility, shall
complete the consideration, and shall make the determination,
referred to in section 111 with respect to each standard
established by paragraphs (11) through (13) of section
111(d).''.
(2) Failure to comply.--Section 112(c) of the Public
Utility Regulatory Policies Act of 1978 (16 U.S.C.
2622(c)) is amended by adding at the end the following:
``In the case of each standard established by paragraphs (11)
through (13) of section 111(d), the reference contained in this
subsection to the date of enactment of this Act shall be deemed
to be a reference to the date of enactment of such paragraphs
(11) through (13).''.
(3) Prior state actions.--
(A) In general.--Section 112 of the Public
Utility Regulatory Policies Act of 1978 (16
U.S.C. 2622) is amended by adding at the end
the following:
``(d) Prior State Actions.--Subsections (b) and (c) of this
section shall not apply to the standards established by
paragraphs (11) through (13) of section 111(d) in the case of
any electric utility in a State if, before the enactment of
this subsection--
``(1) the State has implemented for such utility the
standard concerned (or a comparable standard);
``(2) the State regulatory authority for such State
or relevant nonregulated electric utility has conducted
a proceeding to consider implementation of the standard
concerned (or a comparable standard) for such utility;
or
``(3) the State legislature has voted on the
implementation of such standard (or a comparable
standard) for such utility.''.
(B) Cross reference.--Section 124 of such Act
(16 U.S.C. 2634) is amended by adding the
following at the end thereof: ``In the case of
each standard established by paragraphs (11)
through (13) of section 111(d), the reference
contained in this subsection to the date of
enactment of this Act shall be deemed to be a
reference to the date of enactment of such
paragraphs (11) through (13).''.
SEC. 1252. SMART METERING.
(a) In General.--Section 111(d) of the Public Utilities
Regulatory Policies Act of 1978 (16 U.S.C. 2621(d)) is amended
by adding at the end the following:
``(14) Time-based metering and communications.--
``(A) Not later than 18 months after the date
of enactment of this paragraph, each electric
utility shall offer each of its customer
classes, and provide individual customers upon
customer request, a time-based rate schedule
under which the rate charged by the electric
utility varies during different time periods
and reflects the variance, if any, in the
utility's costs of generating and purchasing
electricity at the wholesale level. The time-
based rate schedule shall enable the electric
consumer to manage energy use and cost through
advanced metering and communications
technology.
``(B) The types of time-based rate schedules
that may be offered under the schedule referred
to in subparagraph (A) include, among others--
``(i) time-of-use pricing whereby
electricity prices are set for a
specific time period on an advance or
forward basis, typically not changing
more often than twice a year, based on
the utility's cost of generating and/or
purchasing such electricity at the
wholesale level for the benefit of the
consumer. Prices paid for energy
consumed during these periods shall be
pre-established and known to consumers
in advance of such consumption,
allowing them to vary their demand and
usage in response to such prices and
manage their energy costs by shifting
usage to a lower cost period or
reducing their consumption overall;
``(ii) critical peak pricing whereby
time-of-use prices are in effect except
for certain peak days, when prices may
reflect the costs of generating and/or
purchasing electricity at the wholesale
level and when consumers may receive
additional discounts for reducing peak
period energy consumption; and
``(iii) real-time pricing whereby
electricity prices are set for a
specific time period on an advanced or
forward basis, reflecting the utility's
cost of generating and/or purchasing
electricity at the wholesale level, and
may change as often as hourly.
``(C) Each electric utility subject to
subparagraph (A) shall provide each customer
requesting a time-based rate with a time-based
meter capable of enabling the utility and
customer to offer and receive such rate,
respectively.
``(D) For purposes of implementing this
paragraph, any reference contained in this
section to the date of enactment of the Public
Utility Regulatory Policies Act of 1978 shall
be deemed to be a reference to the date of
enactment of this paragraph.
``(E) In a State that permits third-party
marketers to sell electric energy to retail
electric consumers, such consumers shall be
entitled to receive the same time-based
metering and communications device and service
as a retail electric consumer of the electric
utility.
``(F) Notwithstanding subsections (b) and (c)
of section 112, each State regulatory authority
shall, not later than 18 months after the date
of enactment of this paragraph conduct an
investigation in accordance with section 115(i)
and issue a decision whether it is appropriate
to implement the standards set out in
subparagraphs (A) and (C).''.
(b) State Investigation of Demand Response and Time-Based
Metering.--Section 115 of the Public Utilities Regulatory
Policies Act of 1978 (16 U.S.C. 2625) is amended as follows:
(1) By inserting in subsection (b) after the phrase
``the standard for time-of-day rates established by
section 111(d)(3)'' the following: ``and the standard
for time-based metering and communications established
by section 111(d)(14)''.
(2) By inserting in subsection (b) after the phrase
``are likely to exceed the metering'' the following:
``and communications''.
(3) By adding the at the end the following:
``(i) Time-Based Metering and Communications.--In making a
determination with respect to the standard established by
section 111(d)(14), the investigation requirement of section
111(d)(14)(F) shall be as follows: Each State regulatory
authority shall conduct an investigation and issue a decision
whether or not it is appropriate for electric utilities to
provide and install time-based meters and communications
devices for each of their customers which enable such customers
to participate in time-based pricing rate schedules and other
demand response programs.''.
(c) Federal Assistance on Demand Response.--Section 132(a) of
the Public Utility Regulatory Policies Act of 1978 (16 U.S.C.
2642(a)) is amended by striking ``and'' at the end of paragraph
(3), striking the period at the end of paragraph (4) and
inserting ``; and'', and by adding the following at the end
thereof:
``(5) technologies, techniques, and rate-making
methods related to advanced metering and communications
and the use of these technologies, techniques and
methods in demand response programs.''.
(d) Federal Guidance.--Section 132 of the Public Utility
Regulatory Policies Act of 1978 (16 U.S.C. 2642) is amended by
adding the following at the end thereof:
``(d) Demand Response.--The Secretary shall be responsible
for--
``(1) educating consumers on the availability,
advantages, and benefits of advanced metering and
communications technologies, including the funding of
demonstration or pilot projects;
``(2) working with States, utilities, other energy
providers and advanced metering and communications
experts to identify and address barriers to the
adoption of demand response programs; and
``(3) not later than 180 days after the date of
enactment of the Energy Policy Act of 2005, providing
Congress with a report that identifies and quantifies
the national benefits of demand response and makes a
recommendation on achieving specific levels of such
benefits by January 1, 2007.''.
(e) Demand Response and Regional Coordination.--
(1) In general.--It is the policy of the United
States to encourage States to coordinate, on a regional
basis, State energy policies to provide reliable and
affordable demand response services to the public.
(2) Technical assistance.--The Secretary of Energy
shall provide technical assistance to States and
regional organizations formed by 2 or more States to
assist them in--
(A) identifying the areas with the greatest
demand response potential;
(B) identifying and resolving problems in
transmission and distribution networks,
including through the use of demand response;
(C) developing plans and programs to use
demand response to respond to peak demand or
emergency needs; and
(D) identifying specific measures consumers
can take to participate in these demand
response programs.
(3) Report.--Not later than 1 year after the date of
enactment of the Energy Policy Act of 2005, the
Commission shall prepare and publish an annual report,
by appropriate region, that assesses demand response
resources, including those available from all consumer
classes, and which identifies and reviews--
(A) saturation and penetration rate of
advanced meters and communications
technologies, devices and systems;
(B) existing demand response programs and
time-based rate programs;
(C) the annual resource contribution of
demand resources;
(D) the potential for demand response as a
quantifiable, reliable resource for regional
planning purposes; and
(E) steps taken to ensure that, in regional
transmission planning and operations, demand
resources are provided equitable treatment as a
quantifiable, reliable resource relative to the
resource obligations of any load-serving
entity, transmission provider, or transmitting
party.
(f) Federal Encouragement of Demand Response Devices.--It is
the policy of the United States that time-based pricing and
other forms of demand response, whereby electricity customers
are provided with electricity price signals and the ability to
benefit by responding to them, shall be encouraged, and the
deployment of such technology and devices that enable
electricity customers to participate in such pricing and demand
response systems shall be facilitated. It is further the policy
of the United States that the benefits of such demand response
that accrue to those not deploying such technology and devices,
but who are part of the same regional electricity entity, shall
be recognized.
(g) Time Limitations.--Section 112(b) of the Public Utility
Regulatory Policies Act of 1978 (16 U.S.C. 2622(b)) is amended
by adding at the end the following:
``(4)(A) Not later than 1 year after the enactment of
this paragraph, each State regulatory authority (with
respect to each electric utility for which it has
ratemaking authority) and each nonregulated electric
utility shall commence the consideration referred to in
section 111, or set a hearing date for such
consideration, with respect to the standard established
by paragraph (14) of section 111(d).
``(B) Not later than 2 years after the date of the
enactment of this paragraph, each State regulatory
authority (with respect to each electric utility for
which it has ratemaking authority), and each
nonregulated electric utility, shall complete the
consideration, and shall make the determination,
referred to in section 111 with respect to the standard
established by paragraph (14) of section 111(d).''.
(h) Failure to Comply.--Section 112(c) of the Public Utility
Regulatory Policies Act of 1978 (16 U.S.C. 2622(c)) is amended
by adding at the end the following:
``In the case of the standard established by paragraph (14) of
section 111(d), the reference contained in this subsection to
the date of enactment of this Act shall be deemed to be a
reference to the date of enactment of such paragraph (14).''.
(i) Prior State Actions Regarding Smart Metering Standards.--
(1) In general.--Section 112 of the Public Utility
Regulatory Policies Act of 1978 (16 U.S.C. 2622) is
amended by adding at the end the following:
``(e) Prior State Actions.--Subsections (b) and (c) of this
section shall not apply to the standard established by
paragraph (14) of section 111(d) in the case of any electric
utility in a State if, before the enactment of this
subsection--
``(1) the State has implemented for such utility the
standard concerned (or a comparable standard);
``(2) the State regulatory authority for such State
or relevant nonregulated electric utility has conducted
a proceeding to consider implementation of the standard
concerned (or a comparable standard) for such utility
within the previous 3 years; or
``(3) the State legislature has voted on the
implementation of such standard (or a comparable
standard) for such utility within the previous 3
years.''.
(2) Cross reference.--Section 124 of such Act (16
U.S.C. 2634) is amended by adding the following at the
end thereof: ``In the case of the standard established
by paragraph (14) of section 111(d), the reference
contained in this subsection to the date of enactment
of this Act shall be deemed to be a reference to the
date of enactment of such paragraph (14).''.
Subtitle D--Market Transparency, Enforcement, and Consumer Protection
SEC. 1282. MARKET MANIPULATION.
Part II of the Federal Power Act (16 U.S.C. 824 et seq.) is
amended by adding at the end the following:
``SEC. 221. PROHIBITION ON FILING FALSE INFORMATION.
``No person or other entity (including an entity described in
section 201(f)) shall willfully and knowingly report any
information relating to the price of electricity sold at
wholesale or availability of transmission capacity, which
information the person or any other entity knew to be false at
the time of the reporting, to a Federal agency with intent to
fraudulently affect the data being compiled by such Federal
agency.
``SEC. 222. PROHIBITION ON ROUND TRIP TRADING.
``(a) Prohibition.--No person or other entity (including an
entity described in section 201(f)) shall willfully and
knowingly enter into any contract or other arrangement to
execute a `round trip trade' for the purchase or sale of
electric energy at wholesale.
``(b) Definition.--For the purposes of this section, the term
`round trip trade' means a transaction, or combination of
transactions, in which a person or any other entity--
``(1) enters into a contract or other arrangement to
purchase from, or sell to, any other person or other
entity electric energy at wholesale;
``(2) simultaneously with entering into the contract
or arrangement described in paragraph (1), arranges a
financially offsetting trade with such other person or
entity for the same such electric energy, at the same
location, price, quantity and terms so that,
collectively, the purchase and sale transactions in
themselves result in no financial gain or loss; and
``(3) enters into the contract or arrangement with a
specific intent to fraudulently affect reported
revenues, trading volumes, or prices.''.
SEC. 1283. FRAUDULENT OR MANIPULATIVE PRACTICES.
(a) Unlawful Acts.--It shall be unlawful for any entity,
directly or indirectly, by the use of any means or
instrumentality of interstate commerce or of the mails to use
or employ, in the transmission of electric energy in interstate
commerce, the sale of electric energy at wholesale in
interstate commerce, the transportation of natural gas in
interstate commerce, or the sale in interstate commerce of
natural gas for resale for ultimate public consumption for
domestic, commercial, industrial, or any other use, any
fraudulent, manipulative, or deceptive device or contrivance in
contravention of such rules and regulations as the Federal
Energy Regulatory Commission may prescribe as necessary or
appropriate in the public interest.
(b) Application of Federal Power Act to This Act.--The
provisions of section 307 through 309 and 313 through 317 of
the Federal Power Act shall apply to violations of the Electric
Reliability Act of 2005 in the same manner and to the same
extent as such provisions apply to entities subject to Part II
of the Federal Power Act.
SEC. 1284. RULEMAKING ON EXEMPTIONS, WAIVERS, ETC UNDER FEDERAL POWER
ACT.
Part III of the Federal Power Act is amended by inserting
the following new section after section 319 and by
redesignating sections 320 and 321 as sections 321 and 322,
respectively:
``SEC. 320. CRITERIA FOR CERTAIN EXEMPTIONS, WAIVERS, ETC.
``(a) Rule Required for Certain Waivers, Exemptions, Etc.--
Not later than 6 months after the enactment of this Act, the
Commission shall promulgate a rule establishing specific
criteria for providing an exemption, waiver, or other reduced
or abbreviated form of compliance with the requirements of
sections 204, 301, 304, and 305 (including any prospective
blanket order). Such criteria shall be sufficient to insure
that any such action taken by the Commission will be consistent
with the purposes of such requirements and will otherwise
protect the public interest.
``(b) Moratorium on Certain Waivers, Exemptions, Etc.--After
the date of enactment of this section, the Commission may not
issue, adopt, order, approve, or promulgate any exemption,
waiver, or other reduced or abbreviated form of compliance with
the requirements of section 204, 301, 304, or 305 (including
any prospective blanket order) until after the rule promulgated
under subsection (a) has taken effect.
``(c) Previous Ferc Action.--The Commission shall undertake a
review, by rule or order, of each exemption, waiver, or other
reduced or abbreviated form of compliance described in
subsection (a) that was taken before the date of enactment of
this section. No such action may continue in force and effect
after the date 18 months after the date of enactment of this
section unless the Commission finds that such action complies
with the rule under subsection (a).
``(d) Exemption Under 204(f) not Applicable.--For purposes of
this section, in applying section 204, the provisions of
section 204(f) shall not apply.''.
SEC. 1285. REPORTING REQUIREMENTS IN ELECTRIC POWER SALES AND
TRANSMISSION.
(a) Audit Trails.--Section 304 of the Federal Power Act is
amended by adding the following new subsection at the end
thereof:
``(c)(1) The Commission shall, by rule or order, require each
person or other entity engaged in the transmission of electric
energy in interstate commerce or the sale of electric energy at
wholesale in interstate commerce, and each broker, dealer, and
power marketer involved in any such transmission or sale, to
maintain, and periodically submit to the Commission, such
records, in electronic form, of each transaction relating to
such transmission or sale as may be necessary to determine
whether any person has employed any fraudulent, manipulative,
or deceptive device or contrivance in contravention of rules
promulgated by the Commission.
``(2) Section 201(f) shall not limit the application
of this subsection.''.
(b) Natural Gas.--Section 8 of the Natural Gas Act is amended
by adding the following new subsection at the end thereof:
``(d) The Commission shall, by rule or order, require each
person or other entity engaged in the transportation of natural
gas in interstate commerce, or the sale in interstate commerce
of natural gas for resale for ultimate public consumption for
domestic, commercial, industrial, or any other use, and each
broker, dealer, and power marketer involved in any such
transportation or sale, to maintain, and periodically submit to
the Commission, such records, in electronic form, of each
transaction relating to such transmission or sale as may be
necessary to determine whether any person has employed any
fraudulent, manipulative, or deceptive device or contrivance in
contravention of rules promulgated by the Commission.''.
SEC. 1286. TRANSPARENCY.
(a) Definition.--As used in this section the term ``electric
power or natural gas information processor'' means any person
engaged in the business of--
(1) collecting, processing, or preparing for
distribution or publication, or assisting,
participating in, or coordinating the distribution or
publication of, information with respect to
transactions in or quotations involving the purchase or
sale of electric power, natural gas, the transmission
of electric energy, or the transportation of natural
gas, or
(2) distributing or publishing (whether by means of a
ticker tape, a communications network, a terminal
display device, or otherwise) on a current and
continuing basis, information with respect to such
transactions or quotations.
The term does not include any bona fide newspaper, news
magazine, or business or financial publication of general and
regular circulation, any self-regulatory organization, any
bank, broker, dealer, building and loan, savings and loan, or
homestead association, or cooperative bank, if such bank,
broker, dealer, association, or cooperative bank would be
deemed to be an electric power or natural gas information
processor solely by reason of functions performed by such
institutions as part of customary banking, brokerage, dealing,
association, or cooperative bank activities, or any common
carrier, as defined in section 3 of the Communications Act of
1934, subject to the jurisdiction of the Federal Communications
Commission or a State commission, as defined in section 3 of
that Act, unless the Commission determines that such carrier is
engaged in the business of collecting, processing, or preparing
for distribution or publication, information with respect to
transactions in or quotations involving the purchase or sale of
electric power, natural gas, the transmission of electric
energy, or the transportation of natural gas.
(b) Prohibition.--No electric power or natural gas
information processor may make use of the mails or any means or
instrumentality of interstate commerce--
(1) to collect, process, distribute, publish, or
prepare for distribution or publication any information
with respect to quotations for, or transactions
involving the purchase or sale of electric power,
natural gas, the transmission of electric energy, or
the transportation of natural gas, or
(2) to assist, participate in, or coordinate the
distribution or publication of such information in
contravention of such rules and regulations as the
Federal Energy Regulatory Commission shall prescribe as
necessary or appropriate in the public interest to
(A) prevent the use, distribution, or
publication of fraudulent, deceptive, or
manipulative information with respect to
quotations for and transactions involving the
purchase or sale of electric power, natural
gas, the transmission of electric energy, or
the transportation of natural gas;
(B) assure the prompt, accurate, reliable,
and fair collection, processing, distribution,
and publication of information with respect to
quotations for and transactions involving the
purchase or sale of electric power, natural
gas, the transmission of electric energy, or
the transportation of natural gas, and the
fairness and usefulness of the form and content
of such information;
(C) assure that all such information
processors may, for purposes of distribution
and publication, obtain on fair and reasonable
terms such information with respect to
quotations for and transactions involving the
purchase or sale of electric power, natural
gas, the transmission of electric energy, or
the transportation of natural gas as is
collected, processed, or prepared for
distribution or publication by any exclusive
processor of such information acting in such
capacity;
(D) assure that, subject to such limitations
as the Commission, by rule, may impose as
necessary or appropriate for the maintenance of
fair and orderly markets, all persons may
obtain on terms which are not unreasonably
discriminatory such information with respect to
quotations for and transactions involving the
purchase or sale of electric power, natural
gas, the transmission of electric energy, or
the transportation of natural gas as is
published or distributed by any electric power
or natural gas information processor;
(E) assure that all electricity and natural
gas electronic communication networks transmit
and direct orders for the purchase and sale of
electricity or natural gas in a manner
consistent with the establishment and operation
of an efficient, fair, and orderly market
system for electricity and natural gas; and
(F) assure equal regulation of all markets
involving the purchase or sale of electric
power, natural gas, the transmission of
electric energy, or the transportation of
natural gas and all persons effecting
transactions involving the purchase or sale of
electric power, natural gas, the transmission
of electric energy, or the transportation of
natural gas.
(c) Related Commodities.--For purposes of this section, the
phrase ``purchase or sale of electric power, natural gas, the
transmission of electric energy, or the transportation of
natural gas'' includes the purchase or sale of any commodity
(as defined in the Commodities Exchange Act) relating to any
such purchase or sale if such commodity is excluded from
regulation under the Commodities Exchange Act pursuant to
section 2 of that Act.
(d) Prohibition.--No person who owns, controls, or is under
the control or ownership of a public utility, a natural gas
company, or a public utility holding company may own, control,
or operate any electronic computer network or other mulitateral
trading facility utilized to trade electricity or natural gas.
SEC. 1287. PENALTIES.
(a) Criminal Penalties.--Section 316 of the Federal Power Act
(16 U.S.C. 825o(c)) is amended as follows:
(1) By striking ``$5,000'' in subsection (a) and
inserting ``$5,000,000 for an individual and
$25,000,000 for any other defendant'' and by striking
out ``two years'' and inserting ``five years'' .
(2) By striking ``$500'' in subsection (b) and
inserting ``$1,000,000''.
(3) By striking subsection (c).
(b) Civil Penalties.--Section 316A of the Federal Power Act
(16 U.S.C. 825o091) is amended as follows:
(1) By striking ``section 211, 212, 213, or 214''
each place it appears and inserting ``Part II''.
(2) By striking ``$10,000 for each day that such
violation continues'' and inserting ``the greater of
$1,000,000 or three times the profit made or gain or
loss avoided by reason of such violation''.
(3) By adding the following at the end thereof:
``(c) Authority of a Court to Prohibit Persons From Certain
Activities.--In any proceeding under this section, the court
may censure, place limitations on the activities, functions, or
operations of, suspend or revoke the ability of any entity
(without regard to section 201(f)) to participate in the
transmission of electric energy in interstate commerce or the
sale of electric energy at wholesale in interstate commerce if
it finds that such censure, placing of limitations, suspension,
or revocation is in the public interest and that one or more of
the following applies to such entity:
``(1) Such entity has willfully made or caused to be
made in any application or report required to be filed
with the Commission or with any other appropriate
regulatory agency, or in any proceeding before the
Commission, any statement which was at the time and in
the light of the circumstances under which it was made
false or misleading with respect to any material fact,
or has omitted to state in any such application or
report any material fact which is required to be stated
therein.
``(2) Such entity has been convicted of any felony or
misdemeanor or of a substantially equivalent crime by a
foreign court of competent jurisdiction which the court
finds--
``(A) involves the purchase or sale of
electricity, the taking of a false oath, the
making of a false report, bribery, perjury,
burglary, any substantially equivalent activity
however denominated by the laws of the relevant
foreign government, or conspiracy to commit any
such offense;
``(B) arises out of the conduct of the
business of transmitting electric energy in
interstate commerce or selling or purchasing
electric energy at wholesale in interstate
commerce;
``(C) involves the larceny, theft, robbery,
extortion, forgery, counterfeiting, fraudulent
concealment, embezzlement, fraudulent
conversion, or misappropriation of funds, or
securities, or substantially equivalent
activity however denominated by the laws of the
relevant foreign government; or
``(D) involves the violation of section 152,
1341, 1342, or 1343 or chapter 25 or 47 of
title 18, United States Code, or a violation of
a substantially equivalent foreign statute.
``(3) Such entity is permanently or temporarily
enjoined by order, judgment, or decree of any court of
competent jurisdiction from acting as an investment
adviser, underwriter, broker, dealer, municipal
securities dealer, government securities broker,
government securities dealer, transfer agent, foreign
person performing a function substantially equivalent
to any of the above, or entity or person required to be
registered under the Commodity Exchange Act or any
substantially equivalent foreign statute or regulation,
or as an affiliated person or employee of any
investment company, bank, insurance company, foreign
entity substantially equivalent to any of the above, or
entity or person required to be registered under the
Commodity Exchange Act or any substantially equivalent
foreign statute or regulation, or from engaging in or
continuing any conduct or practice in connection with
any such activity, or in connection with the purchase
or sale of any security.
``(4) Such entity has willfully violated any
provision of this Act.
``(5) Such entity has willfully aided, abetted,
counseled, commanded, induced, or procured the
violation by any other person of any provision of this
Act, or has failed reasonably to supervise, with a view
to preventing violations of the provisions of this Act,
another person who commits such a violation, if such
other person is subject to his supervision. For the
purposes of this paragraph no person shall be deemed to
have failed reasonably to supervise any other person,
if--
``(A) there have been established procedures,
and a system for applying such procedures,
which would reasonably be expected to prevent
and detect, insofar as practicable, any such
violation by such other person, and
``(B) such person has reasonably discharged
the duties and obligations incumbent upon him
by reason of such procedures and system without
reasonable cause to believe that such
procedures and system were not being complied
with.
``(6) Such entity has been found by a foreign
financial or energy regulatory authority to have--
``(A) made or caused to be made in any
application or report required to be filed with
a foreign regulatory authority, or in any
proceeding before a foreign financial or energy
regulatory authority, any statement that was at
the time and in the light of the circumstances
under which it was made false or misleading
with respect to any material fact, or has
omitted to state in any application or report
to the foreign regulatory authority any
material fact that is required to be stated
therein;
``(B) violated any foreign statute or
regulation regarding the transmission or sale
of electricity or natural gas;
``(C) aided, abetted, counseled, commanded,
induced, or procured the violation by any
person of any provision of any statutory
provisions enacted by a foreign government, or
rules or regulations thereunder, empowering a
foreign regulatory authority regarding
transactions in electricity or natural gas, or
contracts of sale of electricity or natural
gas, traded on or subject to the rules of a
contract market or any board of trade, or has
been found, by a foreign regulatory authority,
to have failed
reasonably to supervise, with a view to preventing
violations of such statutory provisions, rules, and
regulations, another person who commits such a
violation, if such other person is subject to his
supervision.
``(7) Such entity is subject to any final order of a
State commission (or any agency or officer performing
like functions), State authority that supervises or
examines banks, savings associations, or credit unions,
State insurance commission (or any agency or office
performing like functions), an appropriate Federal
banking agency (as defined in section 3 of the Federal
Deposit Insurance Act (12 U.S.C. 1813(q))), or the
National Credit Union Administration, that--
``(A) bars such person from association with
an entity regulated by such commission,
authority, agency, or officer, or from engaging
in the business of securities, insurance,
banking, savings association activities, or
credit union activities; or
``(B) constitutes a final order based on
violations of any laws or regulations that
prohibit fraudulent, manipulative, or deceptive
conduct.''
(4) Such entity is subject to statutory
disqualification within the meaning of section 3(a)(39)
of the Securities Exchange Act of 1934.
(c) Natural Gas Act Penalties.--Section 21 of the Natural Gas
Act is amended by adding the following new subsection at the
end thereof:
``(c) Authority of a Court to Prohibit Persons From Certain
Activities.--In any proceeding under this section, the court
may censure, place limitations on the activities, functions, or
operations of, suspend or revoke the ability of any entity
(without regard to section 201(f)) to participate in the
transportation of natural gas in interstate commerce, or the
sale in interstate commerce of natural gas for resale for
ultimate public consumption for domestic, commercial,
industrial, or any other use if it finds that such censure,
placing of limitations, suspension, or revocation is in the
public interest and that one or more of the following applies
to such entity:
``(1) Such entity has willfully made or caused to be
made in any application or report required to be filed
with the Commission or with any other appropriate
regulatory agency, or in any proceeding before the
Commission, any statement which was at the time and in
the light of the circumstances under which it was made
false or misleading with respect to any material fact,
or has omitted to state in any such application or
report any material fact which is required to be stated
therein.
``(2) Such entity has been convicted of any felony or
misdemeanor or of a substantially equivalent crime by a
foreign court of competent jurisdiction which the court
finds--
``(A) involves the purchase or sale of
natural gas, the taking of a false oath, the
making of a false report, bribery, perjury,
burglary, any substantially equivalent activity
however denominated by the laws of the relevant
foreign government, or conspiracy to commit any
such offense;
``(B) arises out of the conduct of the
business of transmitting natural gas in
interstate commerce, or the selling in
interstate commerce of natural gas for resale
for ultimate public consumption for domestic,
commercial, industrial, or any other use;
``(C) involves the larceny, theft, robbery,
extortion, forgery, counterfeiting, fraudulent
concealment, embezzlement, fraudulent
conversion, or misappropriation of funds, or
securities, or substantially equivalent
activity however denominated by the laws of the
relevant foreign government; or
``(D) involves the violation of section 152,
1341, 1342, or 1343 or chapter 25 or 47 of
title 18, United States Code, or a violation of
a substantially equivalent foreign statute.
``(3) Such entity is permanently or temporarily
enjoined by order, judgment, or decree of any court of
competent jurisdiction from acting as an investment
adviser, underwriter, broker, dealer, municipal
securities dealer, government securities broker,
government securities dealer, transfer agent, foreign
person performing a function substantially equivalent
to any of the above, or entity or person required to be
registered under the Commodity Exchange Act or any
substantially equivalent foreign statute or regulation,
or as an affiliated person or employee of any
investment company, bank, insurance company, foreign
entity substantially equivalent to any of the above, or
entity or person required to be registered under the
Commodity Exchange Act or any substantially equivalent
foreign statute or regulation, or from engaging in or
continuing any conduct or practice in connection with
any such activity, or in connection with the purchase
or sale of any security.
``(4) Such entity has willfully violated any
provision of this Act.
``(5) Such entity has willfully aided, abetted,
counseled, commanded, induced, or procured the
violation by any other person of any provision of this
Act, or has failed reasonably to supervise, with a view
to preventing violations of the provisions of this Act,
another person who commits such a violation, if such
other person is subject to his supervision. For the
purposes of this paragraph no person shall be deemed to
have failed reasonably to supervise any other person,
if--
``(A) there have been established procedures,
and a system for applying such procedures,
which would reasonably be expected to prevent
and detect, insofar as practicable, any such
violation by such other person, and
``(B) such person has reasonably discharged
the duties and obligations incumbent upon him
by reason of such procedures and system without
reasonable cause to believe that such
procedures and system were not being complied
with.
``(6) Such entity has been found by a foreign
financial or energy regulatory authority to have--
``(A) made or caused to be made in any
application or report required to be filed with
a foreign regulatory authority, or in any
proceeding before a foreign financial or energy
regulatory authority, any statement that was at
the time and in the light of the circumstances
under which it was made false or misleading
with respect to any material fact, or has
omitted to state in any application or report
to the foreign regulatory authority any
material fact that is required to be stated
therein;
``(B) violated any foreign statute or
regulation regarding the transmission or sale
of electricity or natural gas;
``(C) aided, abetted, counseled, commanded,
induced, or procured the violation by any
person of any provision of any statutory
provisions enacted by a foreign government, or
rules or regulations thereunder, empowering a
foreign regulatory authority regarding
transactions in electricity or natural gas, or
contracts of sale of electricity or natural
gas, traded on or subject to the rules of a
contract market or any board of trade, or has
been found, by a foreign regulatory authority,
to have failed reasonably to supervise, with a
view to preventing violations of such statutory
provisions, rules, and regulations, another
person who commits such a violation, if such
other person is subject to his supervision.
``(7) Such entity is subject to any final order of a
State commission (or any agency or officer performing
like functions), State authority that supervises or
examines banks, savings associations, or credit unions,
State insurance commission (or any agency or office
performing like functions), an appropriate Federal
banking agency (as defined in section 3 of the Federal
Deposit Insurance Act (12 U.S.C. 1813(q))), or the
National Credit Union Administration, that--
``(A) bars such person from association with
an entity regulated by such commission,
authority, agency, or officer, or from engaging
in the business of securities, insurance,
banking, savings association activities, or
credit union activities; or
``(B) constitutes a final order based on
violations of any laws or regulations that
prohibit fraudulent, manipulative, or deceptive
conduct.
``(8) Such entity is subject to statutory
disqualification within the meaning of section 3(a)(39)
of the Securities Exchange Act of 1934.''.
SEC. 1288. REVIEW OF PUHCA EXEMPTIONS.
Not later than 12 months after the enactment of this Act the
Securities and Exchange Commission shall review each exemption
granted to any person under section 3(a) of the Public Utility
Holding Company Act of 1935 and shall review the action of
persons operating pursuant to a claim of exempt status under
section 3 to determine if such exemptions and claims are
consistent with the requirements of such section 3(a) and
whether or not such exemptions or claims of exemption should
continue in force and effect.
SEC. 1289. REVIEW OF ACCOUNTING FOR CONTRACTS INVOLVED IN ENERGY
TRADING.
Not later than 12 months after the enactment of this Act, the
Comptroller General of the United States shall submit to the
Congress a report of the results of its review of accounting
for contracts in energy trading and risk management activities.
The review and report shall include, among other issues, the
use of mark-to-market accounting and when gains and losses
should be recognized, with a view toward improving the
transparency of energy trading activities for the benefit of
investors, consumers, and the integrity of these markets.
SEC. 1290. PROTECTION OF FERC REGULATED SUBSIDIARIES.
Section 205 of the Federal Power Act is amended by adding
after subsection (f) the following new subsection:
``(g) Rules and Procedures to Protect Consumers of Public
Utilities.--Not later than 9 months after the date of enactment
of this Act, the Commission shall adopt rules and procedures
for the protection of electric consumers from self-dealing,
interaffiliate abuse, and other harmful actions taken by
persons owning or controlling public utilities. Such rules
shall ensure that no asset of a public utility company shall be
used as collateral for indebtedness incurred by the holding
company of, and any affiliate of, such public utility company,
and no public utility shall acquire or own any securities of
the holding company or other affiliates of the holding company
unless the Commission has determined that such acquisition or
ownership is consistent with the public interest and the
protection of consumers of such public utility.''.
SEC. 1291. REFUNDS UNDER THE FEDERAL POWER ACT.
Section 206(b) of the Federal Power Act is amended as
follows:
(1) By amending the first sentence to read as
follows: ``In any proceeding under this section, the
refund effective date shall be the date of the filing
of a complaint or the date of the Commission motion
initiating the proceeding, except that in the case of a
complaint with regard to market-based rates, the
Commission may establish an earlier refund effective
date.''.
(2) By striking the second and third sentences.
(3) By striking out ``the refund effective date or
by'' and ``, whichever is earlier,'' in the fifth
sentence.
(4) In the seventh sentence by striking ``through a
date fifteen months after such refund effective date''
and insert ``and prior to the conclusion of the
proceeding'' and by striking the proviso.
SEC. 1292. ACCOUNTS AND REPORTS.
Section 318 of the Federal Power Act is amended by adding
the following at the end thereof: ``This section shall not
apply to sections 301 and 304 of this Act.''.
SEC. 1293. MARKET-BASED RATES.
Section 205 of the Federal Power Act is amended by adding
the following new subsection at the end thereof:
``(g) For each public utility granted the authority by the
Commission to sell electric energy at market-based rates, the
Commission shall review the activities and characteristics of
such utility not less frequently than annually to determine
whether such rates are just and reasonable. Each such utility
shall notify the Commission promptly of any change in the
activities and characteristics relied upon by the Commission in
granting such public utility the authority to sell electric
energy at market-based rates. If the Commission finds that:
``(1) a rate charged by a public utility authorized
to sell electric energy at market-based rates is
unjust, unreasonable, unduly discriminatory or
preferential,
``(2) the public utility has intentionally engaged in
an activity that violates any other rule, tariff, or
order of the Commission, or
``(3) any violation of the Electric Reliability Act
of 2005,
the Commission shall issue an order immediately modifying or
revoking the authority of that public utility to sell electric
energy at market-based rates.''.
SEC. 1294. ENFORCEMENT.
(a) Complaints.--Section 306 of the Federal Power Act (16
U.S.C. 825e) is amended as follows:
(1) By inserting ``electric utility,'' after ``Any
person,''.
(2) By inserting ``, transmitting utility,'' after
``licensee'' each place it appears.
(b) Review of Commission Orders.--Section 313(a) of the
Federal Power Act (16 U.S.C. 8251) is amended by inserting
``electric utility,'' after ``person,'' in the first 2 places
it appears and by striking ``any person unless such person''
and inserting ``any entity unless such entity''.
(c) Investigations.--Section 307(a) of the Federal Power Act
(16 U.S.C. 825f(a)) is amended as follows:
(1) By inserting ``, electric utility, transmitting
utility, or other entity'' after ``person'' each time
it appears.
(2) By striking the period at the end of the first
sentence and inserting the following: ``or in obtaining
information about the sale of electric energy at
wholesale in interstate commerce and the transmission
of electric energy in interstate commerce.''.
SEC. 1295. CONSUMER PRIVACY AND UNFAIR TRADE PRACTICES.
(a) Privacy.--The Federal Trade Commission may issue rules
protecting the privacy of electric consumers from the
disclosure of consumer information obtained in connection with
the sale or delivery of electric energy to electric consumers.
(b) Slamming.--The Federal Trade Commission may issue rules
prohibiting the change of selection of an electric utility
except with the informed consent of the electric consumer or if
approved by the appropriate State regulatory authority.
(c) Cramming.--The Federal Trade Commission may issue rules
prohibiting the sale of goods and services to an electric
consumer unless expressly authorized by law or the electric
consumer.
(d) Rulemaking.--The Federal Trade Commission shall proceed
in accordance with section 553 of title 5, United States Code,
when prescribing a rule under this section.
(e) State Authority.--If the Federal Trade Commission
determines that a State's regulations provide equivalent or
greater protection than the provisions of this section, such
State regulations shall apply in that State in lieu of the
regulations issued by the Commission under this section.
(f) Definitions.--For purposes of this section:
(1) State regulatory authority.--The term ``State
regulatory authority'' has the meaning given that term
in section 3(21) of the Federal Power Act (16 U.S.C.
796(21)).
(2) Electric consumer and electric utility.--The
terms ``electric consumer'' and ``electric utility''
have the meanings given those terms in section 3 of the
Public Utility Regulatory Policies Act of 1978 (16
U.S.C. 2602).
``(d) The Commission shall, by rule or order, require each
person or other entity engaged in the transportation of natural
gas in interstate commerce, or the sale in interstate commerce
of natural gas for resale for ultimate public consumption for
domestic, commercial, industrial, or any other use, and each
broker, dealer, and power marketer involved in any such
transportation or sale, to maintain, and periodically submit to
the Commission, such records, in electronic form, of each
transaction relating to such transmission or sale as may be
necessary to determine whether any person has employed any
fraudulent, manipulative, or deceptive device or contrivance in
contravention of rules promulgated by the Commission.''.
SEC. 1296. SAVINGS PROVISION.
Nothing in this title or in any amendment made by this title
shall be construed to affect the authority of any court to make
a determination in any proceeding commenced before the
enactment of this Act regarding the authority of the Federal
Energy Regulatory Commission to permit any person to sell or
distribute electric energy at market-based rates.
3. An Amendment To Be Offered by Representative Markey of
Massachusetts, or His Designee, Debatable for 30 Minutes
Strike title XXII.
----------
4. An Amendment To Be Offered by Representative Boehlert of New York,
or His Designee, Debatable for 20 Minutes
In title VII, at the end of subtitle E, add the following:
SEC. 775. AVERAGE FUEL ECONOMY STANDARDS.
(a) Purpose.--The purpose of this section is to seek to save
each year after 2014 10 percent of the oil that would otherwise
be used for fuel by automobiles in the United States if average
fuel economy standards remained at the same level as the
standards that apply for model year 2007.
(b) In General.--Section 32902 of title 49, United States
Code, is amended by redesignating subsections (i) and (j) in
order as subsections (j) and (k), and by inserting after
subsection (h) the following:
``(i) Standards for Model Years After 2007.--The Secretary
of Transportation shall prescribe by regulation average fuel
economy standards for automobiles manufactured by a
manufacturer in model years after model year 2007, that shall--
``(1) ensure that the average fuel economy achieved
by automobiles manufactured by a manufacturer in model
years after 2014 is no less than 33 miles per gallon;
``(2) ensure that improvements to fuel economy
standards do not degrade the safety of automobiles
manufactured by a manufacturer; and
``(3) maximize the retention of jobs in the
automobile manufacturing sector of the United
States.''.
(c) Conforming Amendments.--Such section is further amended--
(1) in subsection (c)(1) in the first sentence by
inserting ``and subsection (i)'' after ``of this
subsection''; and
(2) in subsection (k) (as redesignated by subsection
(a)) by striking ``or (g)'' and inserting ``(g), or
(i)''.
----------
5. An Amendment To Be Offered by Representative Johnson of Connecticut,
or Her Designee, Debatable for 10 Minutes
In title VII, subtitle E, add at the end the following new
section:
SEC. 775. UPDATE TESTING PROCEDURES.
The Administrator of the Environmental Protection Agency
shall update or revise test procedures, Subpart B_Fuel Economy
Regulations for 1978 and Later Model Year Automobiles-Test
Procedures 600.209-85 and 600.209-95, of the Code of Federal
Regulations, CFR Part 600 (1995) Fuel Economy Regulations for
1977 and Later Model Year Automobiles to take into
consideration higher speed limits, faster acceleration rates,
variations in temperature, use of air conditioning, shorter
city test cycle lengths, current reference fuels, and the use
of other fuel depleting features.
----------
6. An Amendment To Be Offered by Representative Rogers of Michigan, or
His Designee, as an Amendment to the Amendment Numbered ___, To Be
Offered by Representative Johnson of Connecticut, Debatable for 10
Minutes
In the matter proposed to be inserted by the amendment,
strike ``test procedures'' and all that follows through ``Later
Model Year Automobiles-Test Procedures'' and insert ``the
adjustment factors in sections''.
----------
7. An Amendment To Be Offered by Representative Bishop of New York, or
His Designee, Debatable for 30 Minutes
In section 109(2), at the end of the quoted material insert
the following new paragraph:
``(4) All housing constructed under the military
housing privatization initiative of the Department of
Defense shall, to the maximum extent practicable--
``(A) meet Federal building energy efficiency
standards under this section; and
``(B) include Energy Star appliances.
In title I, subtitle A, add at the end the following new
section:
SEC. 112. MODEL BUILDING ENERGY CODE COMPLIANCE GRANT PROGRAM.
(a) In General.--The Secretary shall carry out a program to
provide grants to each State that the Secretary determines,
with respect to new buildings in the State, achieves at least a
90-percent rate of compliance (based on energy performance)
with the most recent model building energy codes.
(b) Guidelines.--Not later than 180 days after the date of
enactment of this Act, the Secretary shall issue guidelines
that standardize criteria by which a State that seeks to
receive a grant under this section may--
(1) verify compliance with applicable model building
energy codes; and
(2) demonstrate eligibility to receive a grant under
this section.
(c) Local Government Codes.--In the case of a State in which
building energy codes are established by local governments--
(1) A local government may--
(A) apply for a grant under this section; and
(B) verify compliance, and demonstrate
eligibility, for the grant under subsection
(b); and
(2) if the Secretary determines that the local
government is eligible to receive a grant, the
Secretary may provide a grant to the local government.
(d) Use of Funds.--Funds from a grant provided under this
section may be used only to carry out activities relating to
the implementation of building energy codes and beyond-code
building practices.
(e) Authorization of Appropriations.--
(1) In general.--There is authorized to be
appropriated to carry out this section $25,000,000 for
each of fiscal years 2006 through 2010.
(2) Set aside.--Of the amounts authorized to be
appropriated under paragraph (1), the Secretary may use
not more than $500,000 for each fiscal year--
(A) to develop compliance guidelines;
(B) to train State and local officials; and
(C) to administer grants provided under this
section.
In section 131(a), amend the proposed section 324A(3) to read
as follows:
``(3) preserve the integrity of the Energy Star label
by--
``(A) regularly updating Energy Star
criteria; and
``(B) ensuring, in general, that--
``(i) not more than 25 percent of
available models in a product class
receive the Energy Star designation;
and
``(ii) Energy Star designated
products and buildings are at least 10
percent more efficient than--
``(I) appliance standards in
effect on the date of enactment
of this section; and
``(II) the most recent model
energy code;
In section 133(a)(2), add at the end the following new
paragraphs:
``(45)(A) The term `commercial prerinse spray valve'
means a handheld device designed and marketed for use
with commercial dishwashing and ware washing equipment
that sprays water on dishes, flatware, and other food
service items for the purpose of removing food residue
before cleaning the items.
``(B) The term `commercial prerinse spray
valve' may include (as determined by the
secretary by rule) products--
``(i) that are extensively used in
conjunction with commercial dishwashing
and ware washing equipment;
``(ii) the application of standards
to which would result in significant
energy savings; and
``(iii) the application of standards
to that would meet the criteria
specified in subsection (o)(4).
``(C) The term `commercial prerinse spray
valve' may exclude (as determined by the
secretary by rule) products--
``(i) that are used for special food
service applications;
``(ii) that are unlikely to be widely
used in conjunction with commercial
dishwashing and ware washing equipment;
and
``(iii) the application of standards
to which would not result in
significant energy savings.
``(46) The term `dehumidifier' means a self-
contained, electrically operated, and mechanically
encased assembly consisting of--
``(A) a refrigerated surface (evaporator)
that condenses moisture from the atmosphere;
``(B) a refrigerating system, including an
electric motor;
``(C) an air-circulating fan; and
``(D) means for collecting or disposing of
the condensate.''.
In section 133(b)(1), insert after the proposed paragraph
(13) the following new paragraphs:
``(14) Test procedures for dehumidifiers shall be based on
the test criteria used under the Energy Star Program
Requirements for Dehumidifiers developed by the Environmental
Protection Agency, as in effect on the date of enactment of
this paragraph unless revised by the Secretary pursuant to this
section.
``(15) The test procedure for measuring flow rate for
commercial prerinse spray valves shall be based on American
Society for Testing and Materials Standard F2324, entitled
`Standard Test Method for Prerinse Spray Valves.'''.
In section 133(c), at the end of the quoted material insert
the following new subsections:
``(ee) Dehumidifiers.--(1) Dehumidifiers manufactured on or
after October 1, 2007, shall have an Energy Factor that meets
or exceeds the following values:
````Product Capacity (pints/day): Minimum Energy Factor (Liters/kWh)
.......................................................... 1.00
> 25 -.................................................... 1.20
> 35 -.................................................... 1.30
> 54 - < 75............................................... 1.50
.......................................................... 2.25.
``(2)(A) Not later than October 1, 2009, the Secretary shall
publish a final rule in accordance with subsections (o) and
(p), to determine whether the standards established under
paragraph (1) should be amended.
``(B) The final rule shall contain any amendment by
the Secretary and shall provide that the amendment
shall apply to products manufactured on or after
October 1, 2012.
``(C) If the Secretary does not publish an amendment
that takes effect by October 1, 2012, dehumidifiers
manufactured on or after October 1, 2012, shall have an
Energy Factor that meets or exceeds the following
values:
````Product Capacity (pints/day): Minimum Energy Factor (Liters/kWh)
.......................................................... 1.20
> 25 -.................................................... 1.30
> 35 -.................................................... 1.40
> 45 -.................................................... 1.50
> 54 - < 75............................................... 1.60
.......................................................... 2.5.
``(ff) Commercial Prerinse Spray Valves.--Commercial prerinse
spray valves manufactured on or after January 1, 2006, shall
have a flow rate less than or equal to 1.6 gallons per minute.
``(gg) Standards for Certain Furnaces.--(1) Notwithstanding
subsection (f) and except as provided in paragraphs (2) and
(3), a furnace (including a furnace designed solely for
installation in a mobile home) manufactured 3 or more years
after the date of enactment of this subsection shall have an
annual fuel utilization efficiency of--
``(A) for natural gas- and propane-fired equipment,
not less than 80 percent; and
``(B) for oil-fired equipment not less than 83
percent.
``(2)(A) Notwithstanding subsection (f) and except as
provided in paragraph (3)--
``(i) a boiler (other than a gas steam boiler)
manufactured 3 or more years after the date of
enactment of this subsection shall have an annual fuel
utilization efficiency of not less than 84 percent; and
``(ii) a gas steam boiler manufactured 3 or more
years after the date of enactment of this subsection
shall have an annual fuel utilization efficiency of not
less than 82 percent.
``(B)(i) Notwithstanding subsection (f), if, after the date
of enactment of this subsection, the Governor of a cold climate
State files with the Secretary a notice that the State has
implemented a requirement for an annual fuel utilization
efficiency of not less than 90 percent for furnaces (other than
boilers and furnaces designed solely for installation in a
mobile home or boiler), the annual fuel utilization efficiency
of a furnace sold in that State shall be not less than 90
percent.
``(ii) If a State described in clause (i) fails to implement
or reasonably enforce (as determined by the Secretary) annual
fuel utilization efficiency in accordance with that clause, the
annual fuel use efficiency for furnaces (other than boilers and
furnaces designed solely for installation in a mobile home or
boiler) in that State shall be the fuel utilization efficiency
established under paragraph (1).
``(3)(A) Not later than 5 years after the date on which a
standard for a product under this subsection takes effect, the
Secretary shall promulgate a final rule to determine whether
that standard should be amended.
``(B) If the Secretary determines that a standard under
subparagraph (A) should be amended--
``(i) the final rule promulgated pursuant to
subparagraph (A) shall contain the new standard; and
``(ii) the new standard shall apply to any product
manufactured after the date that is 5 years after the
date on which the final rule is promulgated.''.
In section 134(b), in the quoted material, insert at the end
the following new paragraphs:
``(6) In the case of dehumidifiers covered under
section 325(ee), the Commission shall not require an
Energy Guide label.
``(7)(A) Not later than July 1, 2006, the Commission
shall prescribe by rule, pursuant to this section,
labeling requirements for the electricity used by
ceiling fans to circulate air in a room.
``(B) The requirements shall be based on the test
procedure and labeling requirements contained in the
Energy Star Program Requirements for Residential
Ceiling Fans, version 2.0, issued by the Environmental
Protection Agency, except that third party testing and
other non-labeling requirements shall not be
promulgated unless the Commission determines the
requirements are necessary to achieve compliance.
``(C) The rule shall apply to products manufactured
after the later of--
``(i) January 1, 2007; or
``(ii) the date that is 60 days after the
final rule is prescribed.''.
In section 135, in the proposed subsection (h), insert ``,
upon adoption of a standard under this Act'' after ``fan light
kits''.
In title I, subtitle, C, add at the end the following new
section:
SEC. 137. COMMERCIAL PACKAGE AIR CONDITIONING AND HEATING EQUIPMENT.
(a) Definitions.--Section 340 of the Energy Policy and
Conservation Act (42 U.S.C. 6311) is amended--
(1) in paragraph (1)--
(A) by redesignating subparagraphs (D)
through (G) as subparagraphs (E) through (H),
respectively; and
(B) by inserting after subparagraph (C) the
following:
``(D) Very large commercial package air
conditioning and heating equipment.'';
(2) in paragraph (2)(B), by striking ``small and
large'';
(3) by striking paragraphs (8) and (9) and inserting
the following:
``(8)(A) The term `commercial package air
conditioning and heating equipment' means air-cooled,
water-cooled, evaporatively-cooled, or water source
(not including ground water source) electrically
operated, unitary central air conditioners and central
air conditioning heat pumps for commercial application.
``(B) The term `small commercial package air
conditioning and heating equipment' means commercial
package air conditioning and heating equipment that is
rated below 135,000 Btu per hour (cooling capacity).
``(C) The term `large commercial package air
conditioning and heating equipment' means commercial
package air conditioning and heating equipment that is
rated at or above 135,000 Btu per hour and below
240,000 Btu per hour (cooling capacity).
``(D) The term `very large commercial package air
conditioning and heating equipment' means commercial
package air conditioning and heating equipment that is
rated at or above 240,000 Btu per hour and below
760,000 Btu per hour (cooling capacity).'';
(4) by redesignating paragraphs (10) through (18) as
paragraphs (9) through (17), respectively; and
(5) in paragraph (10) (as redesignated by
subparagraph (D)), by inserting ``, except for gas unit
heaters and gas duct furnaces'' after ``furnaces''.
(b) Standards.--Section 342(a) of the Energy Policy and
Conservation Act (42 U.S.C. 6313(a)) is amended--
(1) in the subsection heading, by striking ``Small
and Large'' and inserting ``Small, Large, and Very
Large'';
(2) in paragraph (1), by inserting ``but before
January 1, 2010,'' after ``January 1, 1994,'';
(3) in paragraph (2), by inserting ``but before
January 1, 2010,'' after ``January 1, 1995,'';
(4) in paragraph (4), by inserting ``, except for a
gas unit heater or gas duct furnace,'' after
``boiler'';
(5) in paragraph (6)--
(A) in subparagraph (A)--
(i) by inserting ``(i)'' after
``(A)'';
(ii) by striking ``the date of
enactment of the Energy Policy Act of
1992'' and inserting ``January 1,
2010'';
(iii) by inserting after ``large
commercial package air conditioning and
heating equipment'' the following:
``and very large commercial package air
conditioning and heating equipment, or
if ASHRAE/IES Standard 90.1, as in
effect on October 24, 1992, is amended
with respect to any''; and
(iv) by adding at the end the
following:
``(ii) If ASHRAE/IES Standard 90.1 is
not amended with respect to small
commercial package air conditioning and
heating equipment, large commercial
package air conditioning and heating
equipment, and very large commercial
package air conditioning and heating
equipment during the 5-year period
beginning on the effective date of a
standard, the Secretary may initiate a
rulemaking to determine whether a more
stringent standard would result in
significant additional conservation of
energy and is technologically feasible
and economically justified.
``(iii) This subparagraph does not
apply to gas-fired warm-air furnaces,
gas-fired package boilers, storage
water heaters, gas unit heaters, or gas
duct furnaces manufactured 5 or more
years after the date of enactment of
the National Energy Efficiency Policy
Act of 2005.''; and
(B) in subparagraph (C)(ii), by inserting
``and very large commercial package air
conditioning and heating equipment'' after
``large commercial package air conditioning and
heating equipment''; and
(6) by adding at the end the following:
``(7) Each small commercial package air conditioning
and heating equipment manufactured on or after January
1, 2010, shall meet the following standards:
``(A) The minimum energy efficiency ratio of
air-cooled central air conditioners at or above
65,000 btu per hour (cooling capacity) and less
than 135,000 btu per hour (cooling capacity)
shall be--
``(i) 11.2 for equipment with no
heating or electric resistance heating;
and
``(ii) 11.0 for equipment with all
other heating system types that are
integrated into the equipment (at a
standard rating of 95 degrees F db).
``(B) The minimum energy efficiency ratio of
air-cooled central air conditioner heat pumps
at or above 65,000 btu per hour (cooling
capacity) and less than 135,000 btu per hour
(cooling capacity) shall be--
``(i) 11.0 for equipment with no
heating or electric resistance heating;
and
``(ii) 10.8 for equipment with all
other heating system types that are
integrated into the equipment (at a
standard rating of 95 degrees F db).
``(C) The minimum coefficient of performance
in the heating mode of air-cooled central air
conditioning heat pumps at or above 65,000 Btu
per hour (cooling capacity) and less than
135,000 Btu per hour (cooling capacity) shall
be 3.3 (at a high temperature rating of 47
degrees F db).
``(8) Each large commercial package air conditioning
and heating equipment manufactured on or after January
1, 2010, shall meet the following standards:
``(A) The minimum energy efficiency ratio of
air-cooled central air conditioners at or above
135,000 btu per hour (cooling capacity) and
less than 240,000 Btu per hour (cooling
capacity) shall be-
``(i) 11.0 for equipment with no
heating or electric resistance heating;
and
``(ii) 10.8 for equipment with all
other heating system types that are
integrated into the equipment (at a
standard rating of 95 degrees F db).
``(B) The minimum energy efficiency ratio of
air-cooled central air conditioner heat pumps
at or above 135,000 Btu per hour (cooling
capacity) and less than 240,000 btu per hour
(cooling capacity) shall be--
``(i) 10.6 for equipment with no
heating or electric resistance heating;
and
``(ii) 10.4 for equipment with all
other heating system types that are
integrated into the equipment (at a
standard rating of 95 degrees F db).
``(C) The minimum coefficient of performance
in the heating mode of air-cooled central air
conditioning heat pumps at or above 135,000 Btu
per hour (cooling capacity) and less than
240,000 Btu per hour (cooling capacity) shall
be 3.2 (at a high temperature rating of 47
degrees F db).
``(9) Each very large commercial package air
conditioning and heating equipment manufactured on or
after January 1, 2010, shall meet the following
standards:
``(A) The minimum energy efficiency ratio of
air-cooled central air conditioners at or above
240,000 btu per hour (cooling capacity) and
less than 760,000 Btu per hour (cooling
capacity) shall be--
``(i) 10.0 for equipment with no
heating or electric resistance heating;
and
``(ii) 9.8 for equipment with all
other heating system types that are
integrated into the equipment (at a
standard rating of 95 degrees F db).
``(B) The minimum energy efficiency ratio of
air-cooled central air conditioner heat pumps
at or above 240,000 Btu per hour (cooling
capacity) and less than 760,000 Btu per hour
(cooling capacity) shall be--
``(i) 9.5 for equipment with no
heating or electric resistance heating;
and
``(ii) 9.3 for equipment with all
other heating system types that are
integrated into the equipment (at a
standard rating of 95 degrees F db).
``(C) The minimum coefficient of performance
in the heating mode of air-cooled central air
conditioning heat pumps at or above 240,000 Btu
per hour (cooling capacity) and less than
760,000 Btu per hour (cooling capacity) shall
be 3.2 (at a high temperature rating of 47
degrees F db).
``(10) Notwithstanding paragraph (4) and except as
provided in paragraph (14), the minimum thermal
efficiency at the maximum rated capacity of a gas-fired
warm-air furnace with the capacity of 225,000 Btu per
hour or more manufactured 4 or more years after the
date of enactment of this paragraph shall be 79.5
percent.
``(11) Notwithstanding paragraph (4) and except as
provided in paragraph (14), the minimum combustion
efficiency at the maximum rated capacity of a gas-fired
package boiler with the capacity of 300,000 Btu per
hour or more manufactured 4 or more years after the
date of enactment of this paragraph shall be 84
percent.
``(12) Notwithstanding paragraph (5) (excluding
paragraph (5)(g)), and except as provided in paragraph
(14)--
``(A) the maximum standby loss (expressed as
a percent per hour) of a gas-fired storage
water heater shall be 1.30 (expressed as a
measurement of storage volume in gallons); and
``(B) the minimal thermal efficiency of a
gas-fired storage water heater shall be 82
percent.
``(13) Except as provided in paragraph (14), each gas
unit heater and gas duct furnace manufactured 3 or more
years after the date of enactment of this paragraph
shall be equipped with--
``(A) an intermittent ignition device; and
``(B)(i) power venting; or
``(ii) an automatic flue damper.
``(14)(A) Not later than 5 years after the date on
which a standard for a product under paragraph (10),
(11), (12), or (13) takes effect, the Secretary shall
promulgate a final rule to determine whether the
standard for that product should be amended.
``(B) If the Secretary determines that a
standard should be amended under subparagraph
(A)--
``(i) the final rule promulgated
pursuant to subparagraph (A) shall
contain the new standard; and
``(ii) the new standard shall apply
to any product manufactured 4 or more
years after the date on which the final
rule is promulgated.''.
(c) Test Procedures.--Section 343 of the Energy Policy and
Conservation Act (42 U.S.C. 6314) is amended in subsections
(a)(4) and (d)(1), by inserting ``very large commercial package
air conditioning and heating equipment,'' after ``large
commercial package air conditioning and heating equipment,''
each place it appears.
(d) Labeling.--Section 344(e) of the Energy Policy and
Conservation Act (42 U.S.C. 6315(e)) is amended in the first
and second sentences, by inserting ``very large commercial
package air conditioning and heating equipment,'' after ``large
commercial package air conditioning and heating equipment,''
each place it appears.
(e) Administration, Penalties, Enforcement, and Preemption.--
Section 345 of the Energy Policy and Conservation Act (42
U.S.C. 6316) is amended by adding at the end the following:
``(d)(1) Except as provided in paragraphs (2) and (3),
section 327 shall apply with respect to the equipment specified
in section 340(1)(D) to the same extent and in the same manner
as section 327 applies under part A on the date of enactment of
this subsection.
``(2) Any State or local standard prescribed or enacted prior
to the date of enactment of this subsection shall not be
preempted until the standards established under section
342(a)(9) take effect on January 1, 2010.
``(3) If the California Energy Commission adopts, not later
than March 31, 2005, a regulation concerning the energy
efficiency or energy effective after, the standards established
under section 342(a)(9) take effect on January 1, 2010.''.
In section 304, insert at the end the following: ``In
determining whether to defer such acquisition, the Secretary
shall use market-based practices when deciding to acquire
petroleum for the Strategic Petroleum Reserve, as used prior to
2002; carry out and make public analyses of costs and savings
when making or deferring such acquisitions; take into account
and report to Congress the impact the acquisition will have on
the domestic and foreign supply of petroleum and the resulting
price increases or decreases; and consult with the Secretary of
Homeland Security on the security consequences of such
acquisition or deferral.''.
In title III, subtitle A, add at the end the following new
section:
SEC. 305. SENSE OF THE HOUSE OF REPRESENTATIVES.
It is the sense of the House of Representatives that, to
address the crude oil price problem in the short-term, the
President should communicate immediately to the members of the
Organization of Petroleum Exporting Countries (OPEC) cartel and
non-OPEC countries that participate in the cartel of crude oil
producing countries that--
(1) the United States seeks to maintain strong
relations with crude oil producers around the world
while promoting international efforts to remove
barriers to energy trade and investment and increased
access for United States energy firms around the world;
(2) the United States believes that restricting
supply in a market that is in demand for additional
crude oil does serious damage to the efforts that OPEC
members have made to demonstrate that they represent a
reliable source of crude oil supply;
(3) the United States believes that stable crude oil
prices and supplies are essential for strong economic
growth throughout the world;
(4) the United States seeks an immediate increase in
the OPEC crude oil production quotas; and
(5) the United States will temporarily suspend
further purchases of crude oil for the Strategic
Petroleum Reserve, thereby freeing up additional supply
for the marketplace.
Amend section 355 to read as follows (and amend the table of
contents accordingly):
SEC. 355. GREAT LAKES OIL AND GAS DRILLING BAN.
No Federal or State permit or lease shall be issued for new
oil and gas slant, directional, or offshore drilling in or
under one or more of the Great Lakes.
Title XII is amended by striking sections 1201 through 1235
and sections 1237 through 1298, by striking the title heading,
by inserting the following before title XIII, by redesignating
section 1236 (relating to native load service obligation) as
section 1233 of the following and inserting such redesignated
section 1233 after section 1232 of the following, and by making
the necessary conforming changes in the table of contents:
TITLE XII--ELECTRICITY
SEC. 1201. SHORT TITLE.
This title may be cited as the ``Electric Reliability Act of
2005''.
Subtitle A--Reliability Standards
SEC. 1211. ELECTRIC RELIABILITY STANDARDS.
(a) In General.--Part II of the Federal Power Act (16 U.S.C
824 et seq.) is amended by adding at the end the following:
``SEC. 215. ELECTRIC RELIABILITY.
``(a) Definitions.--For purposes of this section:
``(1) The term `bulk-power system' means--
``(A) facilities and control systems
necessary for operating an interconnected
electric energy transmission network (or any
portion thereof); and
``(B) electric energy from generation
facilities needed to maintain transmission
system reliability.
The term does not include facilities used in the local
distribution of electric energy.
``(2) The terms `Electric Reliability Organization'
and `ERO' mean the organization certified by the
Commission under subsection (c) the purpose of which is
to establish and enforce reliability standards for the
bulk-power system, subject to Commission review.
``(3) The term `reliability standard' means a
requirement, approved by the Commission under this
section, to provide for reliable operation of the bulk-
power system. The term includes requirements for the
operation of existing bulk-power system facilities and
the design of planned additions or modifications to
such facilities to the extent necessary to provide for
reliable operation of the bulk-power system, but the
term does not include any requirement to enlarge such
facilities or to construct new transmission capacity or
generation capacity.
``(4) The term `reliable operation' means operating
the elements of the bulk-power system within equipment
and electric system thermal, voltage, and stability
limits so that instability, uncontrolled separation, or
cascading failures of such system will not occur as a
result of a sudden disturbance or unanticipated failure
of system elements.
``(5) The term `Interconnection' means a geographic
area in which the operation of bulk-power system
components is synchronized such that the failure of 1
or more of such components may adversely affect the
ability of the operators of other components within the
system to maintain reliable operation of the facilities
within their control.
``(6) The term `transmission organization' means a
Regional Transmission Organization, Independent System
Operator, independent transmission provider, or other
transmission organization finally approved by the
Commission for the operation of transmission
facilities.
``(7) The term `regional entity' means an entity
having enforcement authority pursuant to subsection
(e)(4).
``(b) Jurisdiction and Applicability.--(1) The Commission
shall have jurisdiction, within the United States, over the ERO
certified by the Commission under subsection (c), any regional
entities, and all users, owners and operators of the bulk-power
system, including but not limited to the entities described in
section 201(f), for purposes of approving reliability standards
established under this section and enforcing compliance with
this section. All users, owners and operators of the bulk-power
system shall comply with reliability standards that take effect
under this section.
``(2) The Commission shall issue a final rule to implement
the requirements of this section not later than 180 days after
the date of enactment of this section.
``(c) Certification.--Following the issuance of a Commission
rule under subsection (b)(2), any person may submit an
application to the Commission for certification as the Electric
Reliability Organization. The Commission may certify 1 such ERO
if the Commission determines that such ERO--
``(1) has the ability to develop and enforce, subject
to subsection (e)(2), reliability standards that
provide for an adequate level of reliability of the
bulk-power system; and
``(2) has established rules that--
``(A) assure its independence of the users
and owners and operators of the bulk-power
system, while assuring fair stakeholder
representation in the selection of its
directors and balanced decisionmaking in any
ERO committee or subordinate organizational
structure;
``(B) allocate equitably reasonable dues,
fees, and other charges among end users for all
activities under this section;
``(C) provide fair and impartial procedures
for enforcement of reliability standards
through the imposition of penalties in
accordance with subsection (e) (including
limitations on activities, functions, or
operations, or other appropriate sanctions);
``(D) provide for reasonable notice and
opportunity for public comment, due process,
openness, and balance of interests in
developing reliability standards and otherwise
exercising its duties; and
``(E) provide for taking, after
certification, appropriate steps to gain
recognition in Canada and Mexico.
The total amount of all dues, fees, and other charges
collected by the ERO in each of the fiscal years 2006
through 2015 and allocated under subparagraph (B) shall
not exceed $50,000,000.
``(d) Reliability Standards.--(1) The Electric Reliability
Organization shall file each reliability standard or
modification to a reliability standard that it proposes to be
made effective under this section with the Commission.
``(2) The Commission may approve, by rule or order, a
proposed reliability standard or modification to a reliability
standard if it determines that the standard is just,
reasonable, not unduly discriminatory or preferential, and in
the public interest. The Commission shall give due weight to
the technical expertise of the Electric Reliability
Organization with respect to the content of a proposed standard
or modification to a reliability standard and to the technical
expertise of a regional entity organized on an Interconnection-
wide basis with respect to a reliability standard to be
applicable within that Interconnection, but shall not defer
with respect to the effect of a standard on competition. A
proposed standard or modification shall take effect upon
approval by the Commission.
``(3) The Electric Reliability Organization shall rebuttably
presume that a proposal from a regional entity organized on an
Interconnection-wide basis for a reliability standard or
modification to a reliability standard to be applicable on an
Interconnection-wide basis is just, reasonable, and not unduly
discriminatory or preferential, and in the public interest.
``(4) The Commission shall remand to the Electric Reliability
Organization for further consideration a proposed reliability
standard or a modification to a reliability standard that the
Commission disapproves in whole or in part.
``(5) The Commission, upon its own motion or upon complaint,
may order the Electric Reliability Organization to submit to
the Commission a proposed reliability standard or a
modification to a reliability standard that addresses a
specific matter if the Commission considers such a new or
modified reliability standard appropriate to carry out this
section.
``(6) The final rule adopted under subsection (b)(2) shall
include fair processes for the identification and timely
resolution of any conflict between a reliability standard and
any function, rule, order, tariff, rate schedule, or agreement
accepted, approved, or ordered by the Commission applicable to
a transmission organization. Such transmission organization
shall continue to comply with such function, rule, order,
tariff, rate schedule or agreement accepted approved, or
ordered by the Commission until--
``(A) the Commission finds a conflict exists between
a reliability standard and any such provision;
``(B) the Commission orders a change to such
provision pursuant to section 206 of this part; and
``(C) the ordered change becomes effective under this
part.
If the Commission determines that a reliability standard needs
to be changed as a result of such a conflict, it shall order
the ERO to develop and file with the Commission a modified
reliability standard under paragraph (4) or (5) of this
subsection.
``(e) Enforcement.--(1) The ERO may impose, subject to
paragraph (2), a penalty on a user or owner or operator of the
bulk-power system for a violation of a reliability standard
approved by the Commission under subsection (d) if the ERO,
after notice and an opportunity for a hearing--
``(A) finds that the user or owner or operator has
violated a reliability standard approved by the
Commission under subsection (d); and
``(B) files notice and the record of the proceeding
with the Commission.
``(2) A penalty imposed under paragraph (1) may take effect
not earlier than the 31st day after the ERO files with the
Commission notice of the penalty and the record of proceedings.
Such penalty shall be subject to review by the Commission, on
its own motion or upon application by the user, owner or
operator that is the subject of the penalty filed within 30
days after the date such notice is filed with the Commission.
Application to the Commission for review, or the initiation of
review by the Commission on its own motion, shall not operate
as a stay of such penalty unless the Commission otherwise
orders upon its own motion or upon application by the user,
owner or operator that is the subject of such penalty. In any
proceeding to review a penalty imposed under paragraph (1), the
Commission, after notice and opportunity for hearing (which
hearing may consist solely of the record before the ERO and
opportunity for the presentation of supporting reasons to
affirm, modify, or set aside the penalty), shall by order
affirm, set aside, reinstate, or modify the penalty, and, if
appropriate, remand to the ERO for further proceedings. The
Commission shall implement expedited procedures for such
hearings.
``(3) On its own motion or upon complaint, the Commission may
order compliance with a reliability standard and may impose a
penalty against a user or owner or operator of the bulk-power
system if the Commission finds, after notice and opportunity
for a hearing, that the user or owner or operator of the bulk-
power system has engaged or is about to engage in any acts or
practices that constitute or will constitute a violation of a
reliability standard.
``(4) The Commission shall issue regulations authorizing the
ERO to enter into an agreement to delegate authority to a
regional entity for the purpose of proposing reliability
standards to the ERO and enforcing reliability standards under
paragraph (1) if--
``(A) the regional entity is governed by--
``(i) an independent board;
``(ii) a balanced stakeholder board; or
``(iii) a combination independent and
balanced stakeholder board.
``(B) the regional entity otherwise satisfies the
provisions of subsection (c)(1) and (2); and
``(C) the agreement promotes effective and efficient
administration of bulk-power system reliability.
The Commission may modify such delegation. The ERO and the
Commission shall rebuttably presume that a proposal for
delegation to a regional entity organized on an
Interconnection-wide basis promotes effective and efficient
administration of bulk-power system reliability and should be
approved. Such regulation may provide that the Commission may
assign the ERO's authority to enforce reliability standards
under paragraph (1) directly to a regional entity consistent
with the requirements of this paragraph.
``(5) The Commission may take such action as is necessary or
appropriate against the ERO or a regional entity to ensure
compliance with a reliability standard or any Commission order
affecting the ERO or a regional entity.
``(6) Any penalty imposed under this section shall bear a
reasonable relation to the seriousness of the violation and
shall take into consideration the efforts of such user, owner,
or operator to remedy the violation in a timely manner.
``(f) Changes in Electric Reliability Organization Rules.--
The Electric Reliability Organization shall file with the
Commission for approval any proposed rule or proposed rule
change, accompanied by an explanation of its basis and purpose.
The Commission, upon its own motion or complaint, may propose a
change to the rules of the ERO. A proposed rule or proposed
rule change shall take effect upon a finding by the Commission,
after notice and opportunity for comment, that the change is
just, reasonable, not unduly discriminatory or preferential, is
in the public interest, and satisfies the requirements of
subsection (c).
``(g) Reliability Reports.--The ERO shall conduct periodic
assessments of the reliability and adequacy of the bulk-power
system in North America.
``(h) Coordination With Canada and Mexico.--The President is
urged to negotiate international agreements with the
governments of Canada and Mexico to provide for effective
compliance with reliability standards and the effectiveness of
the ERO in the United States and Canada or Mexico.
``(i) Savings Provisions.--(1) The ERO shall have authority
to develop and enforce compliance with reliability standards
for only the bulk-power system.
``(2) This section does not authorize the ERO or the
Commission to order the construction of additional generation
or transmission capacity or to set and enforce compliance with
standards for adequacy or safety of electric facilities or
services.
``(3) Nothing in this section shall be construed to preempt
any authority of any State to take action to ensure the safety,
adequacy, and reliability of electric service within that
State, as long as such action is not inconsistent with any
reliability standard, except that the State of New York may
establish rules that result in greater reliability within that
State, as long as such action does not result in lesser
reliability outside the State than that provided by the
reliability standards..
``(4) Within 90 days of the application of the Electric
Reliability Organization or other affected party, and after
notice and opportunity for comment, the Commission shall issue
a final order determining whether a State action is
inconsistent with a reliability standard, taking into
consideration any recommendation of the ERO.
``(5) The Commission, after consultation with the ERO and the
State taking action, may stay the effectiveness of any State
action, pending the Commission's issuance of a final order.
``(j) Regional Advisory Bodies.--The Commission shall
establish a regional advisory body on the petition of at least
\2/3\ of the States within a region that have more than \1/2\
of their electric load served within the region. A regional
advisory body shall be composed of 1 member from each
participating State in the region, appointed by the Governor of
each State, and may include representatives of agencies,
States, and provinces outside the United States. A regional
advisory body may provide advice to the Electric Reliability
Organization, a regional entity, or the Commission regarding
the governance of an existing or proposed regional entity
within the same region, whether a standard proposed to apply
within the region is just, reasonable, not unduly
discriminatory or preferential, and in the public interest,
whether fees proposed to be assessed within the region are
just, reasonable, not unduly discriminatory or preferential,
and in the public interest and any other responsibilities
requested by the Commission. The Commission may give deference
to the advice of any such regional advisory body if that body
is organized on an Interconnection-wide basis.
``(k) Alaska and Hawaii.--The provisions of this section do
not apply to Alaska or Hawaii.''.
(b) Status of ERO.--The Electric Reliability Organization
certified by the Federal Energy Regulatory Commission under
section 215(c) of the Federal Power Act and any regional entity
delegated enforcement authority pursuant to section 215(e)(4)
of that Act are not departments, agencies, or instrumentalities
of the United States Government.
(c) Limitation on Annual Appropriations.--There is authorized
to be appropriated not mroe than $50,000,000 per year for
fiscal years 2006 through 2015 for all activities under the
amendment made by subsection (a).
Subtitle B--Transmission Operation Improvements
SEC. 1231. OPEN NONDISCRIMINATORY ACCESS.
Part II of the Federal Power Act (16 U.S.C. 824 et seq.) is
amended by inserting after section 211 the following new
section:
``SEC. 211A. OPEN ACCESS BY UNREGULATED TRANSMITTING UTILITIES.
``(a) Transmission Services.--Subject to section 212(h), the
Commission may, by rule or order, require an unregulated
transmitting utility to provide transmission services--
``(1) at rates that are comparable to those that the
unregulated transmitting utility charges itself; and
``(2) on terms and conditions (not relating to rates)
that are comparable to those under which such
unregulated transmitting utility provides transmission
services to itself and that are not unduly
discriminatory or preferential.
``(b) Exemption.--The Commission shall exempt from any rule
or order under this section any unregulated transmitting
utility that--
``(1) sells no more than 4,000,000 megawatt hours of
electricity per year; or
``(2) does not own or operate any transmission
facilities that are necessary for operating an
interconnected transmission system (or any portion
thereof); or
``(3) meets other criteria the Commission determines
to be in the public interest.
``(c) Local Distribution Facilities.--The requirements of
subsection (a) shall not apply to facilities used in local
distribution.
``(d) Exemption Termination.--Whenever the Commission, after
an evidentiary hearing held upon a complaint and after giving
consideration to reliability standards established under
section 215, finds on the basis of a preponderance of the
evidence that any exemption granted pursuant to subsection (b)
unreasonably impairs the continued reliability of an
interconnected transmission system, it shall revoke the
exemption granted to that transmitting utility.
``(e) Application to Unregulated Transmitting Utilities.--The
rate changing procedures applicable to public utilities under
subsections (c) and (d) of section 205 are applicable to
unregulated transmitting utilities for purposes of this
section.
``(f) Remand.--In exercising its authority under paragraph
(1) of subsection (a), the Commission may remand transmission
rates to an unregulated transmitting utility for review and
revision where necessary to meet the requirements of subsection
(a).
``(g) Other Requests.--The provision of transmission services
under subsection (a) does not preclude a request for
transmission services under section 211.
``(h) Limitation.--The Commission may not require a State or
municipality to take action under this section that would
violate a private activity bond rule for purposes of section
141 of the Internal Revenue Code of 1986 (26 U.S.C. 141).
``(i) Transfer of Control of Transmitting Facilities.--
Nothing in this section authorizes the Commission to require an
unregulated transmitting utility to transfer control or
operational control of its transmitting facilities to an RTO or
any other Commission-approved independent transmission
organization designated to provide nondiscriminatory
transmission access.
``(j) Definition.--For purposes of this section, the term
`unregulated transmitting utility' means an entity that--
``(1) owns or operates facilities used for the
transmission of electric energy in interstate commerce;
and
``(2) is an entity described in section 201(f).''.
SEC. 1232. FEDERAL UTILITY PARTICIPATION IN REGIONAL TRANSMISSION
ORGANIZATIONS.
(a) Definitions.--For purposes of this section--
(1) Appropriate federal regulatory authority.--The
term ``appropriate Federal regulatory authority''
means--
(A) with respect to a Federal power marketing
agency (as defined in the Federal Power Act),
the Secretary of Energy, except that the
Secretary may designate the Administrator of a
Federal power marketing agency to act as the
appropriate Federal regulatory authority with
respect to the transmission system of that
Federal power marketing agency; and
(B) with respect to the Tennessee Valley
Authority, the Board of Directors of the
Tennessee Valley Authority.
(2) Federal utility.--The term ``Federal utility''
means a Federal power marketing agency or the Tennessee
Valley Authority.
(3) Transmission system.--The term ``transmission
system'' means electric transmission facilities owned,
leased, or contracted for by the United States and
operated by a Federal utility.
(b) Transfer.--The appropriate Federal regulatory authority
is authorized to enter into a contract, agreement or other
arrangement transferring control and use of all or part of the
Federal utility's transmission system to an RTO or ISO (as
defined in the Federal Power Act), approved by the Federal
Energy Regulatory Commission. Such contract, agreement or
arrangement shall include--
(1) performance standards for operation and use of
the transmission system that the head of the Federal
utility determines necessary or appropriate, including
standards that assure recovery of all the Federal
utility's costs and expenses related to the
transmission facilities that are the subject of the
contract, agreement or other arrangement; consistency
with existing contracts and third-party financing
arrangements; and consistency with said Federal
utility's statutory authorities, obligations, and
limitations;
(2) provisions for monitoring and oversight by the
Federal utility of the RTO's or ISO's fulfillment of
the terms and conditions of the contract, agreement or
other arrangement, including a provision for the
resolution of disputes through arbitration or other
means with the regional transmission organization or
with other participants, notwithstanding the
obligations and limitations of any other law regarding
arbitration; and
(3) a provision that allows the Federal utility to
withdraw from the RTO or ISO and terminate the
contract, agreement or other arrangement in accordance
with its terms.
Neither this section, actions taken pursuant to it, nor any
other transaction of a Federal utility using an RTO or ISO
shall confer upon the Federal Energy Regulatory Commission
jurisdiction or authority over the Federal utility's electric
generation assets, electric capacity or energy that the Federal
utility is authorized by law to market, or the Federal
utility's power sales activities.
(c) Existing Statutory and Other Obligations.--
(1) System operation requirements.--No statutory
provision requiring or authorizing a Federal utility to
transmit electric power or to construct, operate or
maintain its transmission system shall be construed to
prohibit a transfer of control and use of its
transmission system pursuant to, and subject to all
requirements of subsection (b).
(2) Other obligations.--This subsection shall not be
construed to--
(A) suspend, or exempt any Federal utility
from, any provision of existing Federal law,
including but not limited to any requirement or
direction relating to the use of the Federal
utility's transmission system, environmental
protection, fish and wildlife protection, flood
control, navigation, water delivery, or
recreation; or
(B) authorize abrogation of any contract or
treaty obligation.
(3) Repeal.--Section 311 of title III of Appendix B
of the Act of October 27, 2000 (P.L. 106-377, section
1(a)(2); 114 Stat. 1441, 1441A-80; 16 U.S.C. 824n) is
repealed.
Subtitle C--Amendments to PURPA
SEC. 1251. NET METERING AND ADDITIONAL STANDARDS.
(a) Adoption of Standards.--Section 111(d) of the Public
Utility Regulatory Policies Act of 1978 (16 U.S.C. 2621(d)) is
amended by adding at the end the following:
``(11) Net metering.--Each electric utility shall
make available upon request net metering service to any
electric consumer that the electric utility serves. For
purposes of this paragraph, the term `net metering
service' means service to an electric consumer under
which electric energy generated by that electric
consumer from an eligible on-site generating facility
and delivered to the local distribution facilities may
be used to offset electric energy provided by the
electric utility to the electric consumer during the
applicable billing period.
``(12) Fuel sources.--Each electric utility shall
develop a plan to minimize dependence on 1 fuel source
and to ensure that the electric energy it sells to
consumers is generated using a diverse range of fuels
and technologies, including renewable technologies.
``(13) Fossil fuel generation efficiency.--Each
electric utility shall develop and implement a 10-year
plan to increase the efficiency of its fossil fuel
generation.''.
(b) Compliance.--
(1) Time limitations.--Section 112(b) of the Public
Utility Regulatory Policies Act of 1978 (16 U.S.C.
2622(b)) is amended by adding at the end the following:
``(3)(A) Not later than 2 years after the enactment of this
paragraph, each State regulatory authority (with respect to
each electric utility for which it has ratemaking authority)
and each nonregulated electric utility shall commence the
consideration referred to in section 111, or set a hearing date
for such consideration, with respect to each standard
established by paragraphs (11) through (13) of section 111(d).
``(B) Not later than 3 years after the date of the enactment
of this paragraph, each State regulatory authority (with
respect to each electric utility for which it has ratemaking
authority), and each nonregulated electric utility, shall
complete the consideration, and shall make the determination,
referred to in section 111 with respect to each standard
established by paragraphs (11) through (13) of section
111(d).''.
(2) Failure to comply.--Section 112(c) of the Public
Utility Regulatory Policies Act of 1978 (16 U.S.C.
2622(c)) is amended by adding at the end the following:
``In the case of each standard established by paragraphs (11)
through (13) of section 111(d), the reference contained in this
subsection to the date of enactment of this Act shall be deemed
to be a reference to the date of enactment of such paragraphs
(11) through (13).''.
(3) Prior state actions.--
(A) In general.--Section 112 of the Public
Utility Regulatory Policies Act of 1978 (16
U.S.C. 2622) is amended by adding at the end
the following:
``(d) Prior State Actions.--Subsections (b) and (c) of this
section shall not apply to the standards established by
paragraphs (11) through (13) of section 111(d) in the case of
any electric utility in a State if, before the enactment of
this subsection--
``(1) the State has implemented for such utility the
standard concerned (or a comparable standard);
``(2) the State regulatory authority for such State
or relevant nonregulated electric utility has conducted
a proceeding to consider implementation of the standard
concerned (or a comparable standard) for such utility;
or
``(3) the State legislature has voted on the
implementation of such standard (or a comparable
standard) for such utility.''.
(B) Cross reference.--Section 124 of such Act
(16 U.S.C. 2634) is amended by adding the
following at the end thereof: ``In the case of
each standard established by paragraphs (11)
through (13) of section 111(d), the reference
contained in this subsection to the date of
enactment of this Act shall be deemed to be a
reference to the date of enactment of such
paragraphs (11) through (13).''.
SEC. 1252. SMART METERING.
(a) In General.--Section 111(d) of the Public Utilities
Regulatory Policies Act of 1978 (16 U.S.C. 2621(d)) is amended
by adding at the end the following:
``(14) Time-based metering and communications.--
``(A) Not later than 18 months after the date
of enactment of this paragraph, each electric
utility shall offer each of its customer
classes, and provide individual customers upon
customer request, a time-based rate schedule
under which the rate charged by the electric
utility varies during different time periods
and reflects the variance, if any, in the
utility's costs of generating and purchasing
electricity at the wholesale level. The time-
based rate schedule shall enable the electric
consumer to manage energy use and cost through
advanced metering and communications
technology.
``(B) The types of time-based rate schedules
that may be offered under the schedule referred
to in subparagraph (A) include, among others--
``(i) time-of-use pricing whereby
electricity prices are set for a
specific time period on an advance or
forward basis, typically not changing
more often than twice a year, based on
the utility's cost of generating and/or
purchasing such electricity at the
wholesale level for the benefit of the
consumer. Prices paid for energy
consumed during these periods shall be
pre-established and known to consumers
in advance of such consumption,
allowing them to vary their demand and
usage in response to such prices and
manage their energy costs by shifting
usage to a lower cost period or
reducing their consumption overall;
``(ii) critical peak pricing whereby
time-of-use prices are in effect except
for certain peak days, when prices may
reflect the costs of generating and/or
purchasing electricity at the wholesale
level and when consumers may receive
additional discounts for reducing peak
period energy consumption; and
``(iii) real-time pricing whereby
electricity prices are set for a
specific time period on an advanced or
forward basis, reflecting the utility's
cost of generating and/or purchasing
electricity at the wholesale level, and
may change as often as hourly.
``(C) Each electric utility subject to
subparagraph (A) shall provide each customer
requesting a time-based rate with a time-based
meter capable of enabling the utility and
customer to offer and receive such rate,
respectively.
``(D) For purposes of implementing this
paragraph, any reference contained in this
section to the date of enactment of the Public
Utility Regulatory Policies Act of 1978 shall
be deemed to be a reference to the date of
enactment of this paragraph.
``(E) In a State that permits third-party
marketers to sell electric energy to retail
electric consumers, such consumers shall be
entitled to receive the same time-based
metering and communications device and service
as a retail electric consumer of the electric
utility.
``(F) Notwithstanding subsections (b) and (c)
of section 112, each State regulatory authority
shall, not later than 18 months after the date
of enactment of this paragraph conduct an
investigation in accordance with section 115(i)
and issue a decision whether it is appropriate
to implement the standards set out in
subparagraphs (A) and (C).''.
(b) State Investigation of Demand Response and Time-Based
Metering.--Section 115 of the Public Utilities Regulatory
Policies Act of 1978 (16 U.S.C. 2625) is amended as follows:
(1) By inserting in subsection (b) after the phrase
``the standard for time-of-day rates established by
section 111(d)(3)'' the following: ``and the standard
for time-based metering and communications established
by section 111(d)(14)''.
(2) By inserting in subsection (b) after the phrase
``are likely to exceed the metering'' the following:
``and communications''.
(3) By adding the at the end the following:
``(i) Time-Based Metering and Communications.--In making a
determination with respect to the standard established by
section 111(d)(14), the investigation requirement of section
111(d)(14)(F) shall be as follows: Each State regulatory
authority shall conduct an investigation and issue a decision
whether or not it is appropriate for electric utilities to
provide and install time-based meters and communications
devices for each of their customers which enable such customers
to participate in time-based pricing rate schedules and other
demand response programs.''.
(c) Federal Assistance on Demand Response.--Section 132(a) of
the Public Utility Regulatory Policies Act of 1978 (16 U.S.C.
2642(a)) is amended by striking ``and'' at the end of paragraph
(3), striking the period at the end of paragraph (4) and
inserting ``; and'', and by adding the following at the end
thereof:
``(5) technologies, techniques, and rate-making
methods related to advanced metering and communications
and the use of these technologies, techniques and
methods in demand response programs.''.
(d) Federal Guidance.--Section 132 of the Public Utility
Regulatory Policies Act of 1978 (16 U.S.C. 2642) is amended by
adding the following at the end thereof:
``(d) Demand Response.--The Secretary shall be responsible
for--
``(1) educating consumers on the availability,
advantages, and benefits of advanced metering and
communications technologies, including the funding of
demonstration or pilot projects;
``(2) working with States, utilities, other energy
providers and advanced metering and communications
experts to identify and address barriers to the
adoption of demand response programs; and
``(3) not later than 180 days after the date of
enactment of the Energy Policy Act of 2005, providing
Congress with a report that identifies and quantifies
the national benefits of demand response and makes a
recommendation on achieving specific levels of such
benefits by January 1, 2007.''.
(e) Demand Response and Regional Coordination.--
(1) In general.--It is the policy of the United
States to encourage States to coordinate, on a regional
basis, State energy policies to provide reliable and
affordable demand response services to the public.
(2) Technical assistance.--The Secretary of Energy
shall provide technical assistance to States and
regional organizations formed by 2 or more States to
assist them in--
(A) identifying the areas with the greatest
demand response potential;
(B) identifying and resolving problems in
transmission and distribution networks,
including through the use of demand response;
(C) developing plans and programs to use
demand response to respond to peak demand or
emergency needs; and
(D) identifying specific measures consumers
can take to participate in these demand
response programs.
(3) Report.--Not later than 1 year after the date of
enactment of the Energy Policy Act of 2005, the
Commission shall prepare and publish an annual report,
by appropriate region, that assesses demand response
resources, including those available from all consumer
classes, and which identifies and reviews--
(A) saturation and penetration rate of
advanced meters and communications
technologies, devices and systems;
(B) existing demand response programs and
time-based rate programs;
(C) the annual resource contribution of
demand resources;
(D) the potential for demand response as a
quantifiable, reliable resource for regional
planning purposes; and
(E) steps taken to ensure that, in regional
transmission planning and operations, demand
resources are provided equitable treatment as a
quantifiable, reliable resource relative to the
resource obligations of any load-serving
entity, transmission provider, or transmitting
party.
(f) Federal Encouragement of Demand Response Devices.--It is
the policy of the United States that time-based pricing and
other forms of demand response, whereby electricity customers
are provided with electricity price signals and the ability to
benefit by responding to them, shall be encouraged, and the
deployment of such technology and devices that enable
electricity customers to participate in such pricing and demand
response systems shall be facilitated. It is further the policy
of the United States that the benefits of such demand response
that accrue to those not deploying such technology and devices,
but who are part of the same regional electricity entity, shall
be recognized.
(g) Time Limitations.--Section 112(b) of the Public Utility
Regulatory Policies Act of 1978 (16 U.S.C. 2622(b)) is amended
by adding at the end the following:
``(4)(A) Not later than 1 year after the enactment of
this paragraph, each State regulatory authority (with
respect to each electric utility for which it has
ratemaking authority) and each nonregulated electric
utility shall commence the consideration referred to in
section 111, or set a hearing date for such
consideration, with respect to the standard established
by paragraph (14) of section 111(d).
``(B) Not later than 2 years after the date of the
enactment of this paragraph, each State regulatory
authority (with respect to each electric utility for
which it has ratemaking authority), and each
nonregulated electric utility, shall complete the
consideration, and shall make the determination,
referred to in section 111 with respect to the standard
established by paragraph (14) of section 111(d).''.
(h) Failure to Comply.--Section 112(c) of the Public Utility
Regulatory Policies Act of 1978 (16 U.S.C. 2622(c)) is amended
by adding at the end the following:
``In the case of the standard established by paragraph (14) of
section 111(d), the reference contained in this subsection to
the date of enactment of this Act shall be deemed to be a
reference to the date of enactment of such paragraph (14).''.
(i) Prior State Actions Regarding Smart Metering Standards.--
(1) In general.--Section 112 of the Public Utility
Regulatory Policies Act of 1978 (16 U.S.C. 2622) is
amended by adding at the end the following:
``(e) Prior State Actions.--Subsections (b) and (c) of this
section shall not apply to the standard established by
paragraph (14) of section 111(d) in the case of any electric
utility in a State if, before the enactment of this
subsection--
``(1) the State has implemented for such utility the
standard concerned (or a comparable standard);
``(2) the State regulatory authority for such State
or relevant nonregulated electric utility has conducted
a proceeding to consider implementation of the standard
concerned (or a comparable standard) for such utility
within the previous 3 years; or
``(3) the State legislature has voted on the
implementation of such standard (or a comparable
standard) for such utility within the previous 3
years.''.
(2) Cross reference.--Section 124 of such Act (16
U.S.C. 2634) is amended by adding the following at the
end thereof: ``In the case of the standard established
by paragraph (14) of section 111(d), the reference
contained in this subsection to the date of enactment
of this Act shall be deemed to be a reference to the
date of enactment of such paragraph (14).''.
Subtitle D--Market Transparency, Enforcement, and Consumer Protection
SEC. 1282. MARKET MANIPULATION.
Part II of the Federal Power Act (16 U.S.C. 824 et seq.) is
amended by adding at the end the following:
``SEC. 221. PROHIBITION ON FILING FALSE INFORMATION.
``No person or other entity (including an entity described in
section 201(f)) shall willfully and knowingly report any
information relating to the price of electricity sold at
wholesale or availability of transmission capacity, which
information the person or any other entity knew to be false at
the time of the reporting, to a Federal agency with intent to
fraudulently affect the data being compiled by such Federal
agency.
``SEC. 222. PROHIBITION ON ROUND TRIP TRADING.
``(a) Prohibition.--No person or other entity (including an
entity described in section 201(f)) shall willfully and
knowingly enter into any contract or other arrangement to
execute a `round trip trade' for the purchase or sale of
electric energy at wholesale.
``(b) Definition.--For the purposes of this section, the term
`round trip trade' means a transaction, or combination of
transactions, in which a person or any other entity--
``(1) enters into a contract or other arrangement to
purchase from, or sell to, any other person or other
entity electric energy at wholesale;
``(2) simultaneously with entering into the contract
or arrangement described in paragraph (1), arranges a
financially offsetting trade with such other person or
entity for the same such electric energy, at the same
location, price, quantity and terms so that,
collectively, the purchase and sale transactions in
themselves result in no financial gain or loss; and
``(3) enters into the contract or arrangement with a
specific intent to fraudulently affect reported
revenues, trading volumes, or prices.''.
SEC. 1283. FRAUDULENT OR MANIPULATIVE PRACTICES.
(a) Unlawful Acts.--It shall be unlawful for any entity,
directly or indirectly, by the use of any means or
instrumentality of interstate commerce or of the mails to use
or employ, in the transmission of electric energy in interstate
commerce, the sale of electric energy at wholesale in
interstate commerce, the transportation of natural gas in
interstate commerce, or the sale in interstate commerce of
natural gas for resale for ultimate public consumption for
domestic, commercial, industrial, or any other use, any
fraudulent, manipulative, or deceptive device or contrivance in
contravention of such rules and regulations as the Federal
Energy Regulatory Commission may prescribe as necessary or
appropriate in the public interest.
(b) Application of Federal Power Act to This Act.--The
provisions of section 307 through 309 and 313 through 317 of
the Federal Power Act shall apply to violations of the Electric
Reliability Act of 2005 in the same manner and to the same
extent as such provisions apply to entities subject to Part II
of the Federal Power Act.
SEC. 1284. RULEMAKING ON EXEMPTIONS, WAIVERS, ETC. UNDER FEDERAL POWER
ACT.
Part III of the Federal Power Act is amended by inserting
the following new section after section 319 and by
redesignating sections 320 and 321 as sections 321 and 322,
respectively:
``SEC. 320. CRITERIA FOR CERTAIN EXEMPTIONS, WAIVERS, ETC.
``(a) Rule Required for Certain Waivers, Exemptions, Etc.--
Not later than 6 months after the enactment of this Act, the
Commission shall promulgate a rule establishing specific
criteria for providing an exemption, waiver, or other reduced
or abbreviated form of compliance with the requirements of
sections 204, 301, 304, and 305 (including any prospective
blanket order). Such criteria shall be sufficient to insure
that any such action taken by the Commission will be consistent
with the purposes of such requirements and will otherwise
protect the public interest.
``(b) Moratorium on Certain Waivers, Exemptions, Etc.--After
the date of enactment of this section, the Commission may not
issue, adopt, order, approve, or promulgate any exemption,
waiver, or other reduced or abbreviated form of compliance with
the requirements of section 204, 301, 304, or 305 (including
any prospective blanket order) until after the rule promulgated
under subsection (a) has taken effect.
``(c) Previous Ferc Action.--The Commission shall undertake a
review, by rule or order, of each exemption, waiver, or other
reduced or abbreviated form of compliance described in
subsection (a) that was taken before the date of enactment of
this section. No such action may continue in force and effect
after the date 18 months after the date of enactment of this
section unless the Commission finds that such action complies
with the rule under subsection (a).
``(d) Exemption Under 204(f) not Applicable.--For purposes of
this section, in applying section 204, the provisions of
section 204(f) shall not apply.''.
SEC. 1285. REPORTING REQUIREMENTS IN ELECTRIC POWER SALES AND
TRANSMISSION.
(a) Audit Trails.--Section 304 of the Federal Power Act is
amended by adding the following new subsection at the end
thereof:
``(c)(1) The Commission shall, by rule or order, require each
person or other entity engaged in the transmission of electric
energy in interstate commerce or the sale of electric energy at
wholesale in interstate commerce, and each broker, dealer, and
power marketer involved in any such transmission or sale, to
maintain, and periodically submit to the Commission, such
records, in electronic form, of each transaction relating to
such transmission or sale as may be necessary to determine
whether any person has employed any fraudulent, manipulative,
or deceptive device or contrivance in contravention of rules
promulgated by the Commission.
``(2) Section 201(f) shall not limit the application
of this subsection.''.
(b) Natural Gas.--Section 8 of the Natural Gas Act is amended
by adding the following new subsection at the end thereof:
``(d) The Commission shall, by rule or order, require each
person or other entity engaged in the transportation of natural
gas in interstate commerce, or the sale in interstate commerce
of natural gas for resale for ultimate public consumption for
domestic, commercial, industrial, or any other use, and each
broker, dealer, and power marketer involved in any such
transportation or sale, to maintain, and periodically submit to
the Commission, such records, in electronic form, of each
transaction relating to such transmission or sale as may be
necessary to determine whether any person has employed any
fraudulent, manipulative, or deceptive device or contrivance in
contravention of rules promulgated by the Commission.''.
SEC. 1286. TRANSPARENCY.
(a) Definition.--As used in this section the term ``electric
power or natural gas information processor'' means any person
engaged in the business of--
(1) collecting, processing, or preparing for
distribution or publication, or assisting,
participating in, or coordinating the distribution or
publication of, information with respect to
transactions in or quotations involving the purchase or
sale of electric power, natural gas, the transmission
of electric energy, or the transportation of natural
gas, or
(2) distributing or publishing (whether by means of a
ticker tape, a communications network, a terminal
display device, or otherwise) on a current and
continuing basis, information with respect to such
transactions or quotations.
The term does not include any bona fide newspaper, news
magazine, or business or financial publication of general and
regular circulation, any self-regulatory organization, any
bank, broker, dealer, building and loan, savings and loan, or
homestead association, or cooperative bank, if such bank,
broker, dealer, association, or cooperative bank would be
deemed to be an electric power or natural gas information
processor solely by reason of functions performed by such
institutions as part of customary banking, brokerage, dealing,
association, or cooperative bank activities, or any common
carrier, as defined in section 3 of the Communications Act of
1934, subject to the jurisdiction of the Federal Communications
Commission or a State commission, as defined in section 3 of
that Act, unless the Commission determines that such carrier is
engaged in the business of collecting, processing, or preparing
for distribution or publication, information with respect to
transactions in or quotations involving the purchase or sale of
electric power, natural gas, the transmission of electric
energy, or the transportation of natural gas.
(b) Prohibition.--No electric power or natural gas
information processor may make use of the mails or any means or
instrumentality of interstate commerce--
(1) to collect, process, distribute, publish, or
prepare for distribution or publication any information
with respect to quotations for, or transactions
involving the purchase or sale of electric power,
natural gas, the transmission of electric energy, or
the transportation of natural gas, or
(2) to assist, participate in, or coordinate the
distribution or publication of such information in
contravention of such rules and regulations as the
Federal Energy Regulatory Commission shall prescribe as
necessary or appropriate in the public interest to
(A) prevent the use, distribution, or
publication of fraudulent, deceptive, or
manipulative information with respect to
quotations for and transactions involving the
purchase or sale of electric power, natural
gas, the transmission of electric energy, or
the transportation of natural gas;
(B) assure the prompt, accurate, reliable,
and fair collection, processing, distribution,
and publication of information with respect to
quotations for and transactions involving the
purchase or sale of electric power, natural
gas, the transmission of electric energy, or
the transportation of natural gas, and the
fairness and usefulness of the form and content
of such information;
(C) assure that all such information
processors may, for purposes of distribution
and publication, obtain on fair and reasonable
terms such information with respect to
quotations for and transactions involving the
purchase or sale of electric power, natural
gas, the transmission of electric energy, or
the transportation of natural gas as is
collected, processed, or prepared for
distribution or publication by any exclusive
processor of such information acting in such
capacity;
(D) assure that, subject to such limitations
as the Commission, by rule, may impose as
necessary or appropriate for the maintenance of
fair and orderly markets, all persons may
obtain on terms which are not unreasonably
discriminatory such information with respect to
quotations for and transactions involving the
purchase or sale of electric power, natural
gas, the transmission of electric energy, or
the transportation of natural gas as is
published or distributed by any electric power
or natural gas information processor;
(E) assure that all electricity and natural
gas electronic communication networks transmit
and direct orders for the purchase and sale of
electricity or natural gas in a manner
consistent with the establishment and operation
of an efficient, fair, and orderly market
system for electricity and natural gas; and
(F) assure equal regulation of all markets
involving the purchase or sale of electric
power, natural gas, the transmission of
electric energy, or the transportation of
natural gas and all persons effecting
transactions involving the purchase or sale of
electric power, natural gas, the transmission
of electric energy, or the transportation of
natural gas.
(c) Related Commodities.--For purposes of this section, the
phrase ``purchase or sale of electric power, natural gas, the
transmission of electric energy, or the transportation of
natural gas'' includes the purchase or sale of any commodity
(as defined in the Commodities Exchange Act) relating to any
such purchase or sale if such commodity is excluded from
regulation under the Commodities Exchange Act pursuant to
section 2 of that Act.
(d) Prohibition.--No person who owns, controls, or is under
the control or ownership of a public utility, a natural gas
company, or a public utility holding company may own, control,
or operate any electronic computer network or other mulitateral
trading facility utilized to trade electricity or natural gas.
SEC. 1287. PENALTIES.
(a) Criminal Penalties.--Section 316 of the Federal Power Act
(16 U.S.C. 825o(c)) is amended as follows:
(1) By striking ``$5,000'' in subsection (a) and
inserting ``$5,000,000 for an individual and
$25,000,000 for any other defendant'' and by striking
out ``two years'' and inserting ``five years'' .
(2) By striking ``$500'' in subsection (b) and
inserting ``$1,000,000''.
(3) By striking subsection (c).
(b) Civil Penalties.--Section 316A of the Federal Power Act
(16 U.S.C. 825o091) is amended as follows:
(1) By striking ``section 211, 212, 213, or 214''
each place it appears and inserting ``Part II''.
(2) By striking ``$10,000 for each day that such
violation continues'' and inserting ``the greater of
$1,000,000 or three times the profit made or gain or
loss avoided by reason of such violation''.
(3) By adding the following at the end thereof:
``(c) Authority of a Court to Prohibit Persons From Certain
Activities.--In any proceeding under this section, the court
may censure, place limitations on the activities, functions, or
operations of, suspend or revoke the ability of any entity
(without regard to section 201(f)) to participate in the
transmission of electric energy in interstate commerce or the
sale of electric energy at wholesale in interstate commerce if
it finds that such censure, placing of limitations, suspension,
or revocation is in the public interest and that one or more of
the following applies to such entity:
``(1) Such entity has willfully made or caused to be
made in any application or report required to be filed
with the Commission or with any other appropriate
regulatory agency, or in any proceeding before the
Commission, any statement which was at the time and in
the light of the circumstances under which it was made
false or misleading with respect to any material fact,
or has omitted to state in any such application or
report any material fact which is required to be stated
therein.
``(2) Such entity has been convicted of any felony or
misdemeanor or of a substantially equivalent crime by a
foreign court of competent jurisdiction which the court
finds--
``(A) involves the purchase or sale of
electricity, the taking of a false oath, the
making of a false report, bribery, perjury,
burglary, any substantially equivalent activity
however denominated by the laws of the relevant
foreign government, or conspiracy to commit any
such offense;
``(B) arises out of the conduct of the
business of transmitting electric energy in
interstate commerce or selling or purchasing
electric energy at wholesale in interstate
commerce;
``(C) involves the larceny, theft, robbery,
extortion, forgery, counterfeiting, fraudulent
concealment, embezzlement, fraudulent
conversion, or misappropriation of funds, or
securities, or substantially equivalent
activity however denominated by the laws of the
relevant foreign government; or
``(D) involves the violation of section 152,
1341, 1342, or 1343 or chapter 25 or 47 of
title 18, United States Code, or a violation of
a substantially equivalent foreign statute.
``(3) Such entity is permanently or temporarily
enjoined by order, judgment, or decree of any court of
competent jurisdiction from acting as an investment
adviser, underwriter, broker, dealer, municipal
securities dealer, government securities broker,
government securities dealer, transfer agent, foreign
person performing a function substantially equivalent
to any of the above, or entity or person required to be
registered under the Commodity Exchange Act or any
substantially equivalent foreign statute or regulation,
or as an affiliated person or employee of any
investment company, bank, insurance company, foreign
entity substantially equivalent to any of the above, or
entity or person required to be registered under the
Commodity Exchange Act or any substantially equivalent
foreign statute or regulation, or from engaging in or
continuing any conduct or practice in connection with
any such activity, or in connection with the purchase
or sale of any security.
``(4) Such entity has willfully violated any
provision of this Act.
``(5) Such entity has willfully aided, abetted,
counseled, commanded, induced, or procured the
violation by any other person of any provision of this
Act, or has failed reasonably to supervise, with a view
to preventing violations of the provisions of this Act,
another person who commits such a violation, if such
other person is subject to his supervision. For the
purposes of this paragraph no person shall be deemed to
have failed reasonably to supervise any other person,
if--
``(A) there have been established procedures,
and a system for applying such procedures,
which would reasonably be expected to prevent
and detect, insofar as practicable, any such
violation by such other person, and
``(B) such person has reasonably discharged
the duties and obligations incumbent upon him
by reason of such procedures and system without
reasonable cause to believe that such
procedures and system were not being complied
with.
``(6) Such entity has been found by a foreign
financial or energy regulatory authority to have--
``(A) made or caused to be made in any
application or report required to be filed with
a foreign regulatory authority, or in any
proceeding before a foreign financial or energy
regulatory authority, any statement that was at
the time and in the light of the circumstances
under which it was made false or misleading
with respect to any material fact, or has
omitted to state in any application or report
to the foreign regulatory authority any
material fact that is required to be stated
therein;
``(B) violated any foreign statute or
regulation regarding the transmission or sale
of electricity or natural gas; or
``(C) aided, abetted, counseled, commanded,
induced, or procured the violation by any
person of any provision of any statutory
provisions enacted by a foreign government, or
rules or regulations thereunder, empowering a
foreign regulatory authority regarding
transactions in electricity or natural gas, or
contracts of sale of electricity or natural
gas, traded on or subject to the rules of a
contract market or any board of trade, or has
been found, by a foreign regulatory authority,
to have failed reasonably to supervise, with a
view to preventing violations of such statutory
provisions, rules, and regulations, another
person who commits such a violation, if such
other person is subject to his supervision.
``(7) Such entity is subject to any final order of a
State commission (or any agency or officer performing
like functions), State authority that supervises or
examines banks, savings associations, or credit unions,
State insurance commission (or any agency or office
performing like functions), an appropriate Federal
banking agency (as defined in section 3 of the Federal
Deposit Insurance Act (12 U.S.C. 1813(q))), or the
National Credit Union Administration, that--
``(A) bars such person from association with
an entity regulated by such commission,
authority, agency, or officer, or from engaging
in the business of securities, insurance,
banking, savings association activities, or
credit union activities; or
``(B) constitutes a final order based on
violations of any laws or regulations that
prohibit fraudulent, manipulative, or deceptive
conduct.''
(4) Such entity is subject to statutory
disqualification within the meaning of section 3(a)(39)
of the Securities Exchange Act of 1934.".
(c) Natural Gas Act Penalties.--Section 21 of the Natural Gas
Act is amended by adding the following new subsection at the
end thereof:
``(c) Authority of a Court to Prohibit Persons From Certain
Activities.--In any proceeding under this section, the court
may censure, place limitations on the activities, functions, or
operations of, suspend or revoke the ability of any entity
(without regard to section 201(f)) to participate in the
transportation of natural gas in interstate commerce, or the
sale in interstate commerce of natural gas for resale for
ultimate public consumption for domestic, commercial,
industrial, or any other use if it finds that such censure,
placing of limitations, suspension, or revocation is in the
public interest and that one or more of the following applies
to such entity:
``(1) Such entity has willfully made or caused to be
made in any application or report required to be filed
with the Commission or with any other appropriate
regulatory agency, or in any proceeding before the
Commission, any statement which was at the time and in
the light of the circumstances under which it was made
false or misleading with respect to any material fact,
or has omitted to state in any such application or
report any material fact which is required to be stated
therein.
``(2) Such entity has been convicted of any felony or
misdemeanor or of a substantially equivalent crime by a
foreign court of competent jurisdiction which the court
finds--
``(A) involves the purchase or sale of
natural gas, the taking of a false oath, the
making of a false report, bribery, perjury,
burglary, any substantially equivalent activity
however denominated by the laws of the relevant
foreign government, or conspiracy to commit any
such offense;
``(B) arises out of the conduct of the
business of transmitting natural gas in
interstate commerce, or the selling in
interstate commerce of natural gas for resale
for ultimate public consumption for domestic,
commercial, industrial, or any other use;
``(C) involves the larceny, theft, robbery,
extortion, forgery, counterfeiting, fraudulent
concealment, embezzlement, fraudulent
conversion, or misappropriation of funds, or
securities, or substantially equivalent
activity however denominated by the laws of the
relevant foreign government; or
``(D) involves the violation of section 152,
1341, 1342, or 1343 or chapter 25 or 47 of
title 18, United States Code, or a violation of
a substantially equivalent foreign statute.
``(3) Such entity is permanently or temporarily
enjoined by order, judgment, or decree of any court of
competent jurisdiction from acting as an investment
adviser, underwriter, broker, dealer, municipal
securities dealer, government securities broker,
government securities dealer, transfer agent, foreign
person performing a function substantially equivalent
to any of the above, or entity or person required to be
registered under the Commodity Exchange Act or any
substantially equivalent foreign statute or regulation,
or as an affiliated person or employee of any
investment company, bank, insurance company, foreign
entity substantially equivalent to any of the above, or
entity or person required to be registered under the
Commodity Exchange Act or any substantially equivalent
foreign statute or regulation, or from engaging in or
continuing any conduct or practice in connection with
any such activity, or in connection with the purchase
or sale of any security.
``(4) Such entity has willfully violated any
provision of this Act.
``(5) Such entity has willfully aided, abetted,
counseled, commanded, induced, or procured the
violation by any other person of any provision of this
Act, or has failed reasonably to supervise, with a view
to preventing violations of the provisions of this Act,
another person who commits such a violation, if such
other person is subject to his supervision. For the
purposes of this paragraph no person shall be deemed to
have failed reasonably to supervise any other person,
if--
``(A) there have been established procedures,
and a system for applying such procedures,
which would reasonably be expected to prevent
and detect, insofar as practicable, any such
violation by such other person, and
``(B) such person has reasonably discharged
the duties and obligations incumbent upon him
by reason of such procedures and system without
reasonable cause to believe that such
procedures and system were not being complied
with.
``(6) Such entity has been found by a foreign
financial or energy regulatory authority to have--
``(A) made or caused to be made in any
application or report required to be filed with
a foreign regulatory authority, or in any
proceeding before a foreign financial or energy
regulatory authority, any statement that was at
the time and in the light of the circumstances
under which it was made false or misleading
with respect to any material fact, or has
omitted to state in any application or report
to the foreign regulatory authority any
material fact that is required to be stated
therein;
``(B) violated any foreign statute or
regulation regarding the transmission or sale
of electricity or natural gas;
``(C) aided, abetted, counseled, commanded,
induced, or procured the violation by any
person of any provision of any statutory
provisions enacted by a foreign government, or
rules or regulations thereunder, empowering a
foreign regulatory authority regarding
transactions in electricity or natural gas, or
contracts of sale of electricity or natural
gas, traded on or subject to the rules of a
contract market or any board of trade, or has
been found, by a foreign regulatory authority,
to have failed reasonably to supervise, with a
view to preventing violations of such statutory
provisions, rules, and regulations, another
person who commits such a violation, if such
other person is subject to his supervision.
``(7) Such entity is subject to any final order of a
State commission (or any agency or officer performing
like functions), State authority that supervises or
examines banks, savings associations, or credit unions,
State insurance commission (or any agency or office
performing like functions), an appropriate Federal
banking agency (as defined in section 3 of the Federal
Deposit Insurance Act (12 U.S.C. 1813(q))), or the
National Credit Union Administration, that--
``(A) bars such person from association with
an entity regulated by such commission,
authority, agency, or officer, or from engaging
in the business of securities, insurance,
banking, savings association activities, or
credit union activities; or
``(B) constitutes a final order based on
violations of any laws or regulations that
prohibit fraudulent, manipulative, or deceptive
conduct.
``(8) Such entity is subject to statutory
disqualification within the meaning of section 3(a)(39)
of the Securities Exchange Act of 1934.''.
SEC. 1288. REVIEW OF PUHCA EXEMPTIONS.
Not later than 12 months after the enactment of this Act the
Securities and Exchange Commission shall review each exemption
granted to any person under section 3(a) of the Public Utility
Holding Company Act of 1935 and shall review the action of
persons operating pursuant to a claim of exempt status under
section 3 to determine if such exemptions and claims are
consistent with the requirements of such section 3(a) and
whether or not such exemptions or claims of exemption should
continue in force and effect.
SEC. 1289. REVIEW OF ACCOUNTING FOR CONTRACTS INVOLVED IN ENERGY
TRADING.
Not later than 12 months after the enactment of this Act, the
Comptroller General of the United States shall submit to the
Congress a report of the results of its review of accounting
for contracts in energy trading and risk management activities.
The review and report shall include, among other issues, the
use of mark-to-market accounting and when gains and losses
should be recognized, with a view toward improving the
transparency of energy trading activities for the benefit of
investors, consumers, and the integrity of these markets.
SEC. 1290. PROTECTION OF FERC REGULATED SUBSIDIARIES.
Section 205 of the Federal Power Act is amended by adding
after subsection (f) the following new subsection:
``(g) Rules and Procedures to Protect Consumers of Public
Utilities.--Not later than 9 months after the date of enactment
of this Act, the Commission shall adopt rules and procedures
for the protection of electric consumers from self-dealing,
interaffiliate abuse, and other harmful actions taken by
persons owning or controlling public utilities. Such rules
shall ensure that no asset of a public utility company shall be
used as collateral for indebtedness incurred by the holding
company of, and any affiliate of, such public utility company,
and no public utility shall acquire or own any securities of
the holding company or other affiliates of the holding company
unless the Commission has determined that such acquisition or
ownership is consistent with the public interest and the
protection of consumers of such public utility.''.
SEC. 1291. REFUNDS UNDER THE FEDERAL POWER ACT.
Section 206(b) of the Federal Power Act is amended as
follows:
(1) By amending the first sentence to read as
follows: ``In any proceeding under this section, the
refund effective date shall be the date of the filing
of a complaint or the date of the Commission motion
initiating the proceeding, except that in the case of a
complaint with regard to market-based rates, the
Commission may establish an earlier refund effective
date.''.
(2) By striking the second and third sentences.
(3) By striking out ``the refund effective date or
by'' and ``, whichever is earlier,'' in the fifth
sentence.
(4) In the seventh sentence by striking ``through a
date fifteen months after such refund effective date''
and insert ``and prior to the conclusion of the
proceeding'' and by striking the proviso.
SEC. 1292. ACCOUNTS AND REPORTS.
Section 318 of the Federal Power Act is amended by adding
the following at the end thereof: ``This section shall not
apply to sections 301 and 304 of this Act.''.
SEC. 1293. MARKET-BASED RATES.
Section 205 of the Federal Power Act is amended by adding
the following new subsection at the end thereof:
``(g) For each public utility granted the authority by the
Commission to sell electric energy at market-based rates, the
Commission shall review the activities and characteristics of
such utility not less frequently than annually to determine
whether such rates are just and reasonable. Each such utility
shall notify the Commission promptly of any change in the
activities and characteristics relied upon by the Commission in
granting such public utility the authority to sell electric
energy at market-based rates. If the Commission finds that:
``(1) a rate charged by a public utility authorized
to sell electric energy at market-based rates is
unjust, unreasonable, unduly discriminatory or
preferential,
``(2) the public utility has intentionally engaged in
an activity that violates any other rule, tariff, or
order of the Commission, or
``(3) any violation of the Electric Reliability Act
of 2005,
the Commission shall issue an order immediately modifying or
revoking the authority of that public utility to sell electric
energy at market-based rates.''.
SEC. 1294. ENFORCEMENT.
(a) Complaints.--Section 306 of the Federal Power Act (16
U.S.C. 825e) is amended as follows:
(1) By inserting ``electric utility,'' after ``Any
person,''.
(2) By inserting ``, transmitting utility,'' after
``licensee'' each place it appears.
(b) Review of Commission Orders.--Section 313(a) of the
Federal Power Act (16 U.S.C. 8251) is amended by inserting
``electric utility,'' after ``person,'' in the first 2 places
it appears and by striking ``any person unless such person''
and inserting ``any entity unless such entity''.
(c) Investigations.--Section 307(a) of the Federal Power Act
(16 U.S.C. 825f(a)) is amended as follows:
(1) By inserting ``, electric utility, transmitting
utility, or other entity'' after ``person'' each time
it appears.
(2) By striking the period at the end of the first
sentence and inserting the following: ``or in obtaining
information about the sale of electric energy at
wholesale in interstate commerce and the transmission
of electric energy in interstate commerce.''.
SEC. 1295. CONSUMER PRIVACY AND UNFAIR TRADE PRACTICES.
(a) Privacy.--The Federal Trade Commission may issue rules
protecting the privacy of electric consumers from the
disclosure of consumer information obtained in connection with
the sale or delivery of electric energy to electric consumers.
(b) Slamming.--The Federal Trade Commission may issue rules
prohibiting the change of selection of an electric utility
except with the informed consent of the electric consumer or if
approved by the appropriate State regulatory authority.
(c) Cramming.--The Federal Trade Commission may issue rules
prohibiting the sale of goods and services to an electric
consumer unless expressly authorized by law or the electric
consumer.
(d) Rulemaking.--The Federal Trade Commission shall proceed
in accordance with section 553 of title 5, United States Code,
when prescribing a rule under this section.
(e) State Authority.--If the Federal Trade Commission
determines that a State's regulations provide equivalent or
greater protection than the provisions of this section, such
State regulations shall apply in that State in lieu of the
regulations issued by the Commission under this section.
(f) Definitions.--For purposes of this section:
(1) State regulatory authority.--The term ``State
regulatory authority'' has the meaning given that term
in section 3(21) of the Federal Power Act (16 U.S.C.
796(21)).
(2) Electric consumer and electric utility.--The
terms ``electric consumer'' and ``electric utility''
have the meanings given those terms in section 3 of the
Public Utility Regulatory Policies Act of 1978 (16
U.S.C. 2602).
``(d) The Commission shall, by rule or order, require each
person or other entity engaged in the transportation of natural
gas in interstate commerce, or the sale in interstate commerce
of natural gas for resale for ultimate public consumption for
domestic, commercial, industrial, or any other use, and each
broker, dealer, and power marketer involved in any such
transportation or sale, to maintain, and periodically submit to
the Commission, such records, in electronic form, of each
transaction relating to such transmission or sale as may be
necessary to determine whether any person has employed any
fraudulent, manipulative, or deceptive device or contrivance in
contravention of rules promulgated by the Commission.''.
SEC. 1296. SAVINGS PROVISION.
Nothing in this title or in any amendment made by this title
shall be construed to affect the authority of any court to make
a determination in any proceeding commenced before the
enactment of this Act regarding the authority of the Federal
Energy Regulatory Commission to permit any person to sell or
distribute electric energy at market-based rates.
In section 25C(b)(1)(A) of the Internal Revenue Code of 1986,
as proposed to be added by section 1311 of the bill, insert
after clause (iii) the following new clauses:
(iv) $150 for each electric heat pump
water heater,
(v) $200 for each advanced natural
gas, oil, propane furnace, or hot water
boiler installed in 2006 ($150 for
equipment installed in 2007, $100 for
equipment installed in 2008),
(vi) $150 for each advanced natural
gas, oil, or propane water heater,
(vii) $50 for each mid-efficiency
natural gas, oil, or propane water
heater,
(viii) $50 for an advanced main air
circulating fan which is installed in a
furnace with an Annual Fuel Utilization
Efficiency of less than 92 percent,
(ix) $150 for each advanced
combination space and water heating
system,
(x) $50 for each mid-efficiency
combination space and water heating
system,
(xi) $250 for each geothermal heat
pump, and
(xii) $250 for each advanced central
air conditioner or central heat pump
($150 for equipment installed in 2008).
In section 25C(a) of the Internal Revenue Code of 1986, as
proposed to be added by section 1311 of the bill, insert after
paragraph (3) the following new paragraph:
(4) the energy efficient building property described
in clauses (iv) through (xii) of subsection (b)(1)(A).
In section 25C(b) of the Internal Revenue Code of 1986, as
proposed to be added by section 1311 of the bill, insert after
paragraph (2) the following new paragraph:
(3) Safety certifications.--No credit shall be
allowed under this section for an item of property
specified in clause (iv) through (xii) of paragraph (1)
unless such property meets the performance and quality
standards, and the certification requirements (if any),
which--
(A) have been prescribed by the Secretary by
regulations (after consultation with the
Secretary of Energy or the Administrator of the
Environmental Protection Agency, as
appropriate),
(B) in the case of the energy efficiency
ratio (EER) for property described in clause
(viii) or (ix) of subsection (d)(1)(B)--
(i) require measurements to be based
on published data which is tested by
manufacturers at 95 degrees Fahrenheit,
and
(ii) do not require ratings to be
based on certified data of the Air
Conditioning and Refrigeration
Institute, and
(C) are in effect at the time of the
acquisition of the property.
In section 25C(c) of the Internal Revenue Code of 1986, as
proposed to be added by section 1311 of the bill, add at the
end the following new paragraphs:
(4) Energy efficient building property.--The term
``energy efficient building property'' means--
(A) an electric heat pump water heater which
yields an energy factor of at least 1.7 in the
standard Department of Energy test procedure,
(B) an advanced natural gas, oil, propane
furnace, or hot water boiler which achieves at
least 92 percent annual fuel utilization
efficiency (AFUE) and which has an advanced
main air circulating fan,
(C) an advanced natural gas, oil, or propane
water heater which has an energy factor of at
least 0.80 in the standard Department of Energy
test procedure,
(D) a mid-efficiency natural gas, oil, or
propane water heater which has an energy factor
of at least 0.65 but less than 0.80 in the
standard Department of Energy test procedure,
(E) an advanced main air circulating fan
which has an annual electricity use of no more
than 2 percent of the total annual energy use
(as determined in the standard Department of
Energy test procedures) and which is used in a
new natural gas, propane, or oil-fired furnace,
(F) an advanced combination space and water
heating system which has a combined energy
factor of at least 0.80 and a combined annual
fuel utilization efficiency (AFUE) of at least
78 percent in the standard Department of Energy
test procedure,
(G) a mid-efficiency combination space and
water heating system which has a combined
energy factor of at least 0.65 but less than
0.80 and a combined annual fuel utilization
efficiency (AFUE) of at least 78 percent in the
standard Department of Energy test procedure,
(H) a geothermal heat pump which has water
heating capability by a desuperheater or full-
condensing option and which has an energy
efficiency ratio (EER) of at least 18 for
ground-loop systems, at least 21 for ground-
water systems, and at least 17 for direct
GeoExchange systems; and
(I) a central air conditioner or central heat
pump which meets the Energy Star specifications
as set by the Environmental Protection Agency.
The specifications must be made effective after
December 31, 2005, and must be current as of
the date of the expenditure or made effective
later in the calendar year of the expenditure.
(5) Labor costs.--Expenditures for labor costs
properly allocable to the onsite preparation, assembly,
or original installation of the property and for piping
or wiring to interconnect property described in
paragraph (4) to the dwelling unit shall be taken into
account for purposes of this section.
In subtitle B of title XIII, add at the end the following:
SEC. 1318. CREDIT FOR CONSTRUCTION OF NEW ENERGY EFFICIENT HOMES.
(a) In General.--Subpart D of part IV of subchapter A of
chapter 1 (relating to business related credits) is amended by
adding at the end the following new section:
``SEC. 45K. NEW ENERGY EFFICIENT HOME CREDIT.
``(a) In General.--For purposes of section 38, in the case of
an eligible contractor with respect to a qualified new energy
efficient home, the credit determined under this section for
the taxable year with respect to such home is an amount equal
to the aggregate adjusted bases of all energy efficient
property installed in such home during construction of such
home.
``(b) Limitations.--
``(1) Maximum credit.--
``(A) In general.--The credit allowed by this
section with respect to a dwelling unit shall
not exceed--
``(i) in the case of a dwelling unit
described in clause (i) or (iii) of
subsection (c)(3)(C), $1,000, and
``(ii) in the case of a dwelling unit
described in clause (ii) or (iv) of
subsection (c)(3)(C), $2,000.
``(B) Prior credit amounts on same dwelling
unit taken into account.--If a credit was
allowed under subsection (a) with respect to a
dwelling unit in 1 or more prior taxable years,
the amount of the credit otherwise allowable
for the taxable year with respect to such
dwelling unit shall be reduced by the sum of
the credits allowed under subsection (a) with
respect to the dwelling unit for all prior
taxable years.
``(2) Coordination with certain credits.--For
purposes of this section--
``(A) the basis of any property referred to
in subsection (a) shall be reduced by that
portion of the basis of any property which is
attributable to qualified rehabilitation
expenditures (as defined in section 47(c)(2))
or to the energy percentage of energy property
(as determined under section 48(a)), and
``(B) expenditures taken into account under
section 47 or 48(a) shall not be taken into
account under this section.
``(c) Definitions.--For purposes of this section--
``(1) Eligible contractor.--The term `eligible
contractor' means--
``(A) the person who constructed the
qualified new energy efficient home, or
``(B) in the case of a qualified new energy
efficient home which is a manufactured home,
the manufactured home producer of such home.
If more than 1 person is described in subparagraph (A)
or (B) with respect to any qualified new energy
efficient home, such term means the person designated
as such by the owner of such home.
``(2) Energy efficient property.--The term `energy
efficient property' means any energy efficient building
envelope component, and any energy efficient heating or
cooling equipment or system, which can, individually or
in combination with other components, result in a
dwelling unit meeting the requirements of this section.
``(3) Qualified new energy efficient home.--The term
`qualified new energy efficient home' means a dwelling
unit--
``(A) located in the United States,
``(B) the construction of which is
substantially completed after the date of the
enactment of this section, and
``(C) which is--
``(i) certified to have a level of
annual heating and cooling energy
consumption which is at least 30
percent below the annual level of
heating and cooling energy consumption
of a comparable dwelling unit
constructed in accordance with the
standards of chapter 4 of the 2003
International Energy Conservation Code,
as such Code (including supplements) is
in effect on the date of the enactment
of this section, and for which the
heating and cooling equipment
efficiencies correspond to the minimum
allowed under the regulations
established by the Department of Energy
pursuant to the National Appliance
Energy Conservation Act of 1987 and in
effect at the time of construction, and
to have building envelope component
improvements account for at least \1/3\
of such 30 percent,
``(ii) certified to have a level of
annual heating and cooling energy
consumption which is at least 50
percent below such annual level and to
have building envelope component
improvements account for at least \1/5\
of such 50 percent,
``(iii) a manufactured home which
meets the requirements of clause (i)
and which conforms to Federal
Manufactured Home Construction and
Safety Standards (section 3280 of title
24, Code of Federal Regulations), or
``(iv) a manufactured home which
meets the requirements of clause (ii)
and which conforms to Federal
Manufactured Home Construction and
Safety Standards (section 3280 of title
24, Code of Federal Regulations).
``(4) Construction.--The term `construction' includes
substantial reconstruction and rehabilitation.
``(5) Acquire.--The term `acquire' includes purchase
and, in the case of reconstruction and rehabilitation,
such term includes a binding written contract for such
reconstruction or rehabilitation.
``(6) Building envelope component.--The term
`building envelope component' means--
``(A) any sealant, insulation material, or
system which is specifically and primarily
designed to reduce the heat loss or gain of a
dwelling unit when installed in or on such
dwelling unit,
``(B) exterior windows (including skylights),
``(C) exterior doors, and
``(D) any metal roof installed on a dwelling
unit, but only if such roof has appropriate
pigmented coatings which--
``(i) are specifically and primarily
designed to reduce the heat gain of
such dwelling unit, and
``(ii) meet the Energy Star program
requirements.
``(d) Certification.--
``(1) Method of certification.--A certification
described in subsection (c)(3)(C) shall be determined
in accordance with guidance prescribed by the
Secretary, after consultation with the Secretary of
Energy. Such guidance shall specify procedures and
methods for calculating energy and cost savings.
``(2) Form.--A certification described in subsection
(c)(3)(C) shall be made in writing in a manner which
specifies in readily verifiable fashion the energy
efficient building envelope components and energy
efficient heating or cooling equipment installed and
their respective rated energy efficiency performance.
``(e) Basis Adjustment.--For purposes of this subtitle, if a
credit is determined under this section for any expenditure
with respect to any property, the increase in the basis of such
property which would (but for this subsection) result from such
expenditure shall be reduced by the amount of the credit so
determined.
``(f) Special Rule With Respect to Buildings With Energy
Efficient Property.--In any case in which a deduction under
section 200 or a credit under section 25C has been allowed with
respect to property in connection with a dwelling unit, the
level of annual heating and cooling energy consumption of the
comparable dwelling unit referred to in clauses (i) and (ii) of
subsection (c)(3)(C) shall be determined assuming such
comparable dwelling unit contains the property for which such
deduction or credit has been allowed.
``(g) Application of Section.--
``(1) 50 percent homes.--In the case of any dwelling
unit described in clause (ii) or (iv) of subsection
(c)(3)(C), subsection (a) shall apply to qualified new
energy efficient homes acquired during the period
beginning on the date of the enactment of this section,
and ending on December 31, 2009.
``(2) 30 percent homes.--In the case of any dwelling
unit described in clause (i) or (iii) of subsection
(c)(3)(C), subsection (a) shall apply to qualified new
energy efficient homes acquired during the period
beginning on the date of the enactment of this section,
and ending on December 31, 2007.''.
(b) Credit Made Part of General Business Credit.--Section
38(b) (relating to current year business credit) is amended by
striking ``plus'' at the end of paragraph (19), by striking the
period at the end of paragraph (18) and inserting ``, plus'',
and by adding at the end the following new paragraph:
``(21) the new energy efficient home credit
determined under section 45K(a).''.
(c) Basis Adjustment.--Subsection (a) of section 1016 is
amended by striking ``and'' at the end of paragraph (33), by
striking the period at the end of paragraph (34) and inserting
``, and'', and by adding at the end the following new
paragraph:
``(35) to the extent provided in section 45K(e), in
the case of amounts with respect to which a credit has
been allowed under section 45K.''.
(d) Deduction for Certain Unused Business Credits.--Section
196(c) (defining qualified business credits) is amended by
striking ``and'' at the end of paragraph (11), by striking the
period at the end of paragraph (12) and inserting ``, and'',
and by adding after paragraph (12) the following new paragraph:
``(13) the new energy efficient home credit
determined under section 45K(a).''.
(e) Clerical Amendment.--The table of sections for subpart D
of part IV of subchapter A of chapter 1 is amended by adding at
the end the following new item:
``Sec. 45K. New energy efficient home credit.''.
(f) Effective Date.--The amendments made by this section
shall apply to taxable years ending after the date of the
enactment of this Act.
SEC. 1319. ENERGY EFFICIENT COMMERCIAL BUILDINGS DEDUCTION.
(a) In General.--Part VI of subchapter B of chapter 1
(relating to itemized deductions for individuals and
corporations) is amended by inserting after section 179B the
following new section:
``SEC. 179C. ENERGY EFFICIENT COMMERCIAL BUILDINGS DEDUCTION.
``(a) In General.--There shall be allowed as a deduction an
amount equal to the cost of energy efficient commercial
building property placed in service during the taxable year.
``(b) Maximum Amount of Deduction.--The deduction under
subsection (a) with respect to any building for the taxable
year and all prior taxable years shall not exceed an amount
equal to the product of--
``(1) $2.25, and
``(2) the square footage of the building.
``(c) Definitions.--For purposes of this section--
``(1) Energy efficient commercial building
property.--The term `energy efficient commercial
building property' means property--
``(A) which is installed on or in any
building located in the United States,
``(B) which is installed as part of--
``(i) the interior lighting systems,
``(ii) the heating, cooling,
ventilation, and hot water systems, or
``(iii) the building envelope, and
``(C) which is certified in accordance with
subsection (d)(6) as being installed as part of
a plan designed to reduce the total annual
energy and power costs with respect to the
interior lighting systems, heating, cooling,
ventilation, and hot water systems of the
building by 50 percent or more in comparison to
a reference building which meets the minimum
requirements of Standard 90.1-2001 using
methods of calculation under subsection (d)(2).
A building described in subparagraph (A) may include
any residential rental property, including any low-rise
multifamily structure or single family housing property
which is not within the scope of Standard 90.1-2001,
but shall not include any qualified new energy
efficient home (within the meaning of section
45K(d)(3)) for which a credit under section 45K has
been allowed.
``(2) Standard 90.1-2001.--The term `Standard 90.1-
2001' means Standard 90.1-2001 of the American Society
of Heating, Refrigerating, and Air Conditioning
Engineers and the Illuminating Engineering Society of
North America (as in effect on April 2, 2003).
``(d) Special Rules.--
``(1) Partial allowance.--
``(A) In general.--Except as provided in
subsection (f), if--
``(i) the requirement of subsection
(c)(1)(C) is not met, but
``(ii) there is a certification in
accordance with paragraph (6) that any
system referred to in subsection
(c)(1)(B) satisfies the energy-savings
targets established by the Secretary
under subparagraph (B) with respect to
such system,
then the requirement of subsection (c)(1)(C)
shall be treated as met with respect to such
system, and the deduction under subsection (a)
shall be allowed with respect to energy
efficient commercial building property
installed as part of such system and as part of
a plan to meet such targets, except that
subsection (b) shall be applied to such
property by substituting `$.75' for `$2.25'.
``(B) Regulations.--The Secretary, after
consultation with the Secretary of Energy,
shall establish a target for each system
described in subsection (c)(1)(B) which, if
such targets were met for all such systems, the
building would meet the requirements of
subsection (c)(1)(C).
``(2) Methods of calculation.--The Secretary, after
consultation with the Secretary of Energy, shall
promulgate regulations which describe in detail methods
for calculating and verifying energy and power
consumption and cost, based on the provisions of the
2005 California Nonresidential Alternative Calculation
Method Approval Manual or, in the case of residential
property, the 2005 California Residential Alternative
Calculation Method Approval Manual. These regulations
shall meet the following requirements:
``(A) In calculating tradeoffs and energy
performance, the regulations shall prescribe
the costs per unit of energy and power, such as
kilowatt hour, kilowatt, gallon of fuel oil,
and cubic foot or Btu of natural gas, which may
be dependent on time of usage. If a State has
developed annual energy usage and cost
calculation procedures based on time of usage
costs for use in the performance standards of
the State's building energy code before the
effective date of this section, the State may
use those annual energy usage and cost
calculation procedures in lieu of those adopted
by the Secretary.
``(B) The calculation methods under this
paragraph need not comply fully with section 11
of Standard 90.1-2001.
``(C) The calculation methods shall be fuel
neutral, such that the same energy efficiency
features shall qualify a building for the
deduction under this section regardless of
whether the heating source is a gas or oil
furnace or an electric heat pump. The reference
building for a proposed design which employs
electric resistance heating shall be modeled as
using a heat pump.
``(D) The calculation methods shall provide
appropriate calculated energy savings for
design methods and technologies not otherwise
credited in either Standard 90.1-2001 or in the
2005 California Nonresidential Alternative
Calculation Method Approval Manual, including
the following:
``(i) Natural ventilation.
``(ii) Evaporative cooling.
``(iii) Automatic lighting controls
such as occupancy sensors, photocells,
and timeclocks.
``(iv) Daylighting.
``(v) Designs utilizing semi-
conditioned spaces which maintain
adequate comfort conditions without air
conditioning or without heating.
``(vi) Improved fan system
efficiency, including reductions in
static pressure.
``(vii) Advanced unloading mechanisms
for mechanical cooling, such as
multiple or variable speed compressors.
``(viii) The calculation methods may
take into account the extent of
commissioning in the building, and
allow the taxpayer to take into account
measured performance which exceeds
typical performance.
``(ix) On-site generation of
electricity, including combined heat
and power systems, fuel cells, and
renewable energy generation such as
solar energy.
``(x) Wiring with lower energy losses
than wiring satisfying Standard 90.1-
2001 requirements for building power
distribution systems.
``(3) Computer software.--
``(A) In general.--Any calculation under
paragraph (2) shall be prepared by qualified
computer software.
``(B) Qualified computer software.--For
purposes of this paragraph, the term `qualified
computer software' means software--
``(i) for which the software designer
has certified that the software meets
all procedures and detailed methods for
calculating energy and power
consumption and costs as required by
the Secretary,
``(ii) which provides such forms as
required to be filed by the Secretary
in connection with energy efficiency of
property and the deduction allowed
under this section, and
``(iii) which provides a notice form
which documents the energy efficiency
features of the building and its
projected annual energy costs.
``(4) Allocation of deduction for public property.--
In the case of energy efficient commercial building
property installed on or in public property, the
Secretary shall promulgate a regulation to allow the
allocation of the deduction to the person primarily
responsible for designing the property in lieu of the
public entity which is the owner of such property. Such
person shall be treated as the taxpayer for purposes of
this section.
``(5) Notice to owner.--Each certification required
under this section shall include an explanation to the
building owner regarding the energy efficiency features
of the building and its projected annual energy costs
as provided in the notice under paragraph (3)(B)(iii).
``(6) Certification.--
``(A) In general.--The Secretary shall
prescribe the manner and method for the making
of certifications under this section.
``(B) Procedures.--The Secretary shall
include as part of the certification process
procedures for inspection and testing by
qualified individuals described in subparagraph
(C) to ensure compliance of buildings with
energy-savings plans and targets. Such
procedures shall be comparable, given the
difference between commercial and residential
buildings, to the requirements in the Mortgage
Industry National Accreditation Procedures for
Home Energy Rating Systems.
``(C) Qualified individuals.--Individuals
qualified to determine compliance shall be only
those individuals who are recognized by an
organization certified by the Secretary for
such purposes.
``(e) Basis Reduction.--For purposes of this subtitle, if a
deduction is allowed under this section with respect to any
energy efficient commercial building property, the basis of
such property shall be reduced by the amount of the deduction
so allowed.
``(f) Interim Rules for Lighting Systems.--Until such time as
the Secretary issues final regulations under subsection
(d)(1)(B) with respect to property which is part of a lighting
system--
``(1) In general.--The lighting system target under
subsection (d)(1)(A)(ii) shall be a reduction in
lighting power density of 25 percent (50 percent in the
case of a warehouse) of the minimum requirements in
Table 9.3.1.1 or Table 9.3.1.2 (not including
additional interior lighting power allowances) of
Standard 90.1-2001.
``(2) Reduction in deduction if reduction less than
40 percent.--
``(A) In general.--If, with respect to the
lighting system of any building other than a
warehouse, the reduction in lighting power
density of the lighting system is not at least
40 percent, only the applicable percentage of
the amount of deduction otherwise allowable
under this section with respect to such
property shall be allowed.
``(B) Applicable percentage.--For purposes of
subparagraph (A), the applicable percentage is
the number of percentage points (not greater
than 100) equal to the sum of--
``(i) 50, and
``(ii) the amount which bears the
same ratio to 50 as the excess of the
reduction of lighting power density of
the lighting system over 25 percentage
points bears to 15.
``(C) Exceptions.--This subsection shall not
apply to any system--
``(i) the controls and circuiting of
which do not comply fully with the
mandatory and prescriptive requirements
of Standard 90.1-2001 and which do not
include provision for bilevel switching
in all occupancies except hotel and
motel guest rooms, store rooms,
restrooms, and public lobbies, or
``(ii) which does not meet the
minimum requirements for calculated
lighting levels as set forth in the
Illuminating Engineering Society of
North America Lighting Handbook,
Performance and Application, Ninth
Edition, 2000.
``(g) Coordination With Other Tax Benefits.--
``(1) No double benefit.--No deduction shall be
allowed under subsection (a) with respect to any
building for which a credit under section 45K has been
allowed.
``(2) Special rule with respect to buildings with
energy efficient property.--In any case in which a
deduction under section 200 or a credit under section
25C has been allowed with respect to property in
connection with a building, the annual energy and power
costs of the reference building referred to in
subsection (c)(1)(C) shall be determined assuming such
reference building contains the property for which such
deduction or credit has been allowed.
``(h) Regulations.--The Secretary shall promulgate such
regulations as necessary--
``(1) to take into account new technologies regarding
energy efficiency and renewable energy for purposes of
determining energy efficiency and savings under this
section, and
``(2) to provide for a recapture of the deduction
allowed under this section if the plan described in
subsection (c)(1)(C) or (d)(1)(A) is not fully
implemented.
``(i) Termination.--This section shall not apply with respect
to property placed in service after December 31, 2010.''.
(b) Conforming Amendments.--
(1) Section 1016(a) is amended by striking ``and'' at
the end of paragraph (34), by striking the period at
the end of paragraph (35) and inserting ``, and'', and
by adding at the end the following new paragraph:
``(36) to the extent provided in section 179C(e).''.
(2) Section 1245(a) is amended by inserting ``179C,''
after ``179B,'' both places it appears in paragraphs
(2)(C) and (3)(C).
(3) Section 1250(b)(3) is amended by inserting before
the period at the end of the first sentence ``or by
section 179C''.
(4) Section 263(a)(1) is amended by striking ``or''
at the end of subparagraph (H), by striking the period
at the end of subparagraph (I) and inserting ``, or'',
and by inserting after subparagraph (I) the following
new subparagraph:
``(J) expenditures for which a deduction is
allowed under section 179C.''.
(5) Section 312(k)(3)(B) is amended by striking
``section 179, 179A, or 179B'' each place it appears in
the heading and text and inserting ``section 179, 179A,
179B, or 179C''.
(c) Clerical Amendment.--The table of sections for part VI of
subchapter B of chapter 1 is amended by inserting after section
179B the following new item:
``Sec. 179C. Energy efficient commercial buildings deduction.''.
(d) Effective Date.--The amendments made by this section
shall apply to property placed in service after the date of the
enactment of this Act in taxable years ending after such date.
SEC. 1320. ENERGY CREDIT FOR COMBINED HEAT AND POWER SYSTEM PROPERTY.
(a) In General.--Section 48(a)(3)(A) (defining energy
property), as amended by this title, is amended by striking
``or'' at the end of clause (ii), by inserting ``or'' at the
end of clause (iii), and by adding at the end the following:
``(iv) combined heat and power system
property,''.
(b) Combined Heat and Power System Property.--Section 48
(relating to energy credit), as amended by this title, is
amended by adding at the end the following new subsection:
``(c) Combined Heat and Power System Property.--For purposes
of subsection (a)(3)(A)(iv)--
``(1) Combined heat and power system property.--The
term `combined heat and power system property' means
property comprising a system--
``(A) which uses the same energy source for
the simultaneous or sequential generation of
electrical power, mechanical shaft power, or
both, in combination with the generation of
steam or other forms of useful thermal energy
(including heating and cooling applications),
``(B) which has an electrical capacity of not
more than 15 megawatts or a mechanical energy
capacity of not more than 2,000 horsepower or
an equivalent combination of electrical and
mechanical energy capacities,
``(C) which produces--
``(i) at least 20 percent of its
total useful energy in the form of
thermal energy which is not used to
produce electrical or mechanical power
(or combination thereof), and
``(ii) at least 20 percent of its
total useful energy in the form of
electrical or mechanical power (or
combination thereof),
``(D) the energy efficiency percentage of
which exceeds 60 percent, and
``(E) which is placed in service before
January 1, 2009.
``(2) Special rules.--
``(A) Energy efficiency percentage.--For
purposes of this subsection, the energy
efficiency percentage of a system is the
fraction--
``(i) the numerator of which is the
total useful electrical, thermal, and
mechanical power produced by the system
at normal operating rates, and expected
to be consumed in its normal
application, and
``(ii) the denominator of which is
the lower heating value of the fuel
sources for the system.
``(B) Determinations made on btu basis.--The
energy efficiency percentage and the
percentages under paragraph (1)(C) shall be
determined on a Btu basis.
``(C) Input and output property not
included.--The term `combined heat and power
system property' does not include property used
to transport the energy source to the facility
or to distribute energy produced by the
facility.
``(D) Public utility property.--
``(i) Accounting rule for public
utility property.--If the combined heat
and power system property is public
utility property (as defined in section
168(i)(10)), the taxpayer may only
claim the credit under subsection (a)
if, with respect to such property, the
taxpayer uses a normalization method of
accounting.
``(ii) Certain exception not to
apply.--The matter in subsection (a)(3)
which follows subparagraph (D) thereof
shall not apply to combined heat and
power system property.
``(E) Nonapplication of certain rules.--For
purposes of determining if the term `combined
heat and power system property' includes
technologies which generate electricity or
mechanical power using back-pressure steam
turbines in place of existing pressure-reducing
valves or which make use of waste heat from
industrial processes such as by using organic
rankine, stirling, or kalina heat engine
systems, paragraph (1) shall be applied without
regard to subparagraphs (A), (C), and (D)
thereof.
``(3) Systems using bagasse.--If a system is designed
to use bagasse for at least 90 percent of the energy
source--
``(A) paragraph (1)(D) shall not apply, but
``(B) the amount of credit determined under
subsection (a) with respect to such system
shall not exceed the amount which bears the
same ratio to such amount of credit (determined
without regard to this paragraph) as the energy
efficiency percentage of such system bears to
60 percent.
(c) Effective Date.--The amendments made by this subsection
shall apply to periods after December 31, 2005, in taxable
years ending after such date, under rules similar to the rules
of section 48(m) of the Internal Revenue Code of 1986 (as in
effect on the day before the date of the enactment of the
Revenue Reconciliation Act of 1990).
SEC. 1320A. EXTENSION THROUGH 2010 FOR PLACING QUALIFIED FACILITIES IN
SERVICE FOR PRODUCING RENEWABLE ELECTRIC ENERGY.
(a) In General.--Subsection (d) of section 45 is amended by
striking ``January 1, 2006'' each place it appears and
inserting ``January 1, 2011''.
(b) Effective Date.--The amendments made by this section
shall apply to property originally placed in service on or
after January 1, 2006.
At the end of title XIII, insert after subtitle C the
following new subtitle:
Subtitle D--Method of Accounting for Oil, Gas, and Primary Products
Thereof
SEC. 1331. PROHIBITION ON USING LAST IN, FIRST-OUT ACCOUNTING FOR OIL,
GAS, AND PRIMARY PRODUCTS THEREOF.
(a) In General.--Section 472 (relating to last-in, first-out
inventories) is amended by adding at the end the following new
subsection:
``(h) Oil and Gas.--Notwithstanding any other provision of
this section--
``(1) oil, gas, and any primary product of oil or
gas, shall be inventoried separately, and
``(2) a taxpayer may not use the method provided in
subsection (b) in inventorying oil, gas, and any
primary product of oil or gas.''.
(b) Effective Date and Special Rule.--
(1) In general.--The amendment made by subsection (a)
shall apply to taxable years beginning after the date
of the enactment of this Act.
(2) Change in method of accounting.--In the case of
any taxpayer required by the amendment made by this
section to change its method of accounting for its
first taxable year beginning after the date of the
enactment of this Act--
(A) such change shall be treated as initiated
by the taxpayer,
(B) such change shall be treated as made with
the consent of the Secretary of the Treasury,
and
(C) the net amount of the adjustments
required to be taken into account by the
taxpayer under section 481 of the Internal
Revenue Code of 1986 shall be taken into
account ratably over a period (not greater than
10 taxable years) beginning with such first
taxable year.
SEC. 1332. EMERGING TECHNOLOGIES TRUST FUND.
(a) In General.--Subchapter A of chapter 98 (relating to
trust fund code) is amended by adding at the end the following
new section:
``SEC. 9511. EMERGING TECHNOLOGIES TRUST FUND.
``(a) Creation of Trust Fund.--There is established in the
Treasury of the United States a trust fund to be known as the
`Emerging Technologies Trust Fund', consisting of such amounts
as may be appropriated or credited to such Trust Fund as
provided in this section or section 9602(b).
``(b) Transfers to Trust Fund.--
``(1) In general.--There are hereby appropriated to
the Emerging Technologies Trust Fund amounts equivalent
to the taxes received in the Treasury by reason of
section 472(h) (relating to prohibition on use of last-
in, first-out inventory accounting for oil and gas).
``(2) Limitation.--The amount appropriated to the
Trust Fund under paragraph (1) for any fiscal year
shall not exceed $5,000,000,000.
``(c) Expenditures.--Amounts in the Emerging Technologies
Trust Fund shall be available to the Secretary of Energy to
carry out a program to research and develop emerging
technologies for more efficient and renewable energy
sources.''.
(b) Clerical Amendment.--The table of sections for such
subchapter is amended by adding at the end thereof the
following new item:
``Sec. 9511. Emerging Technologies Trust Fund.''.
In title XIV, add at the end the following new sections:
SEC. 1452. SMALL BUSINESS COMMERCIALIZATION ASSISTANCE.
(a) Authority.--The Secretary of Energy shall provide
assistance, to small businesses with less than 100 employees
and startup companies, for the commercial application of
renewable energy and energy efficiency technologies developed
by or with support from the Department of Energy. Such
assistance shall be provided through a competitive review
process.
(b) Applications.--The Secretary of Energy shall establish
requirements for applications for assistance under this
section. Such applications shall contain a commercial
application plan, including a description of the financial,
business, and technical support (including support from
universities and national laboratories) the applicant
anticipates in its commercial application effort.
(c) Selection.--The Secretary of Energy shall select
applicants to receive assistance under this section on the
basis of which applications are the most likely to result in
commercial application of renewable energy and energy
efficiency technologies.
(d) Limit on Federal Funding.--The Secretary of Energy shall
provide under this section no more than 50 percent of the costs
of the project funded.
(e) Authorization of Appropriations.--There are authorized to
be appropriated to the Secretary of Energy for carrying out
this section $200,000,000 for each of the fiscal years 2006
through 2010, and such sums as may be necessary for each of the
fiscal years 2011 through 2026.
SEC. 1453. SENSE OF THE CONGRESS.
It is the sense of the Congress that the President should
direct the Federal Trade Commission and Attorney General to
exercise vigorous oversight over the oil markets to protect the
American people from price gouging and unfair practices at the
gasoline pump.
SEC. 1454. TRANSPARENCY.
The Federal Trade Commission, in consultation with the
Secretary of Energy, shall issue regulations requiring full
disclosure by refiners and distributors of their wholesale
motor fuel pricing policies, with a separate listing of each
component contributing to prices, including the cost of crude
oil (with exploration, extraction, and transportation costs
shown separately if the refiner or distributor is also the
producer of the crude oil), refining, marketing,
transportation, equipment, overhead, and profit, along with
ption of any rebates, incentives, and market enhancement
allowances.
In title XVI, add at the end the following new section:
SEC. 1614. STUDY OF FINANCING FOR PROTOTYPE TECHNOLOGIES.
(a) Independent Assessment.--The Secretary of Energy shall
commission an independent assessment of innovative financing
techniques to facilitate construction of new renewable energy
and energy efficiency facilities that might not otherwise be
built in a competitive market.
(b) Conduct of the Assessment.--The Secretary of Energy shall
retain an independent contractor with proven expertise in
financing large capital projects or in financial services
consulting to conduct the assessment under this section.
(c) Content of the Assessment.--The assessment shall include
a comprehensive examination of all available techniques to
safeguard private investors against risks (including both
market-based and government-imposed risks) that are beyond the
control of the investors. Such techniques may include Federal
loan guarantees, Federal price guarantees, special tax
considerations, and direct Federal investment.
(d) Report.--The Secretary of Energy shall submit the results
of the independent assessment to the Congress not later than 9
months after the date of enactment of this section.
----------
8. An Amendment To Be Offered by Representative Slaughter of New York,
or Her Designee, Debatable for 10 Minutes
In title I, subtitle C, add at the end the following new
section:
SEC. 135. INTERMITTENT ESCALATORS.
Section 543 of the National Energy Conservation Policy Act
(42 U.S.C. 8253) is amended by adding at the end the following
new subsection:
``(e) Intermittent Escalators.--
``(1) Requirement.--Except as provided in paragraph
(2), any escalator acquired for installation in a
Federal building shall be an intermittent escalator.
``(2) Exception.--Paragraph (1) shall not apply at a
location outside the United States where the Federal
agency determines that to acquire an intermittent
escalator would require substantially greater cost to
the Government over the life of the escalator.
``(3) Additional energy conservation measures.--In
addition to complying with paragraph (1), Federal
agencies shall incorporate other escalator energy
conservation measures, as appropriate.
``(4) Definition.--For purposes of this subsection,
the term `intermittent escalator' means an escalator
that remains in a stationary position until it
automatically operates at the approach of a passenger,
returning to a stationary position after the passenger
completes passage.''.
----------
9. An Amendment To Be Offered by Representative Waxman of California,
or His Designee, Debatable for 10 Minutes
At the end of title I, add the following new subtitle and
make the necessary conforming changes in the table of contents:
Subtitle E--Plan to Reduce Oil Demand
SEC. 151. PRESIDENTIAL ACTIONS.
(a) Proposed Actions.--For purposes of reducing waste of oil
and decreasing demand for foreign oil, not later than 6 months
after the date of enactment of this Act, appropriate Federal
Departments and agencies, as identified by the President, shall
propose voluntary, regulatory, and other actions sufficient to
reduce demand for oil in the United States by at least 1.0
million barrels per day from projected demand for oil in 2013.
(b) Request to Congress.--If the President determines that
the Departments and agencies referred to in subsection (a) lack
authority or funding to implement the actions proposed under
subsection (a), the President shall request the necessary
authority or funding from Congress no later than 9 months after
the date of enactment of this Act.
(c) Final Actions.--No later than 12 months after the date of
enactment of this Act, the Departments and agencies referred to
in subsection (a) shall finalize the actions proposed pursuant
to subsection (a) for which they have authority and funding.
(d) Presidential Determination.--The Departments and agencies
referred to in subsection (a) may finalize regulatory and other
actions pursuant to subsection (c) that achieve demand
reductions less than the demand reduction specified in
subsection (a) if the President, after public notice and
opportunity for comment, determines that there are no practical
opportunities for the nation to further reduce waste of oil.
(e) CAFE.--Nothing in this section shall mandate any changes
in average fuel economy standards (``CAFE'' standards)
prescribed under chapter 329 of title 49 of the United States
Code.
----------
10. An Amendment To Be Offered by Representative Oberstar of Minnesota,
or His Designee, Debatable for 10 Minutes
At the end of subtitle A of title II, add the following (and
conform the table of contents accordingly):
SEC. 209. INSTALLATION OF PHOTOVOLTAIC SYSTEM.
There is authorized to be appropriated to the General
Services Administration to install a photovoltaic system, as
set forth in the Sun Wall Design Project, for the headquarters
building of the Department of Energy located at 1000
Independence Avenue Southwest in the District of Columbia,
commonly known as the Forrestal Building, $20,000,000 for
fiscal year 2006. Such sums shall remain available until
expended.
----------
11. An Amendment To Be Offered by Representative Abercrombie of Hawaii,
or His Designee, Debatable for 10 Minutes
In title II, subtitle A, add at the end the following new
section:
SEC. 209. SUGAR CANE ETHANOL PILOT PROGRAM.
(a) Definitions.--In this section:
(1) Program.--The term ``program'' means the Sugar
Cane Ethanol Pilot Program established by subsection
(b).
(2) Secretary.--The term ``Secretary'' means the
Secretary of Energy.
(b) Establishment.--There is established within the
Department of Energy a program to be known as the ``Sugar Cane
Ethanol Pilot Program''.
(c) Project.--
(1) In general.--In carrying out the program, the
Secretary shall establish a pilot project that is--
(A) located in the State of Hawaii; and
(B) designed to study the creation of ethanol
from cane sugar.
(2) Requirements.--A pilot project described in
paragraph (1) shall--
(A) be limited to the production of ethanol
in Hawaii in a way similar to the existing
program for the processing of corn for ethanol
to show that the process can be applicable to
cane sugar;
(B) include information on how the scale of
projection can be replicated once the sugar
cane industry has site located and constructed
ethanol production facilities; and
(C) not last more than 3 years.
(d) Authorization of Appropriations.--There are authorized to
be appropriated to carry out this section $8,000,000, to remain
available until expended.
----------
12. An Amendment To Be Offered by Representative Kaptur of Ohio, or Her
Designee, Debatable for 10 Minutes
In title III, subtitle A, add at the end the following new
section (and amend the table of contents accordingly):
SEC. 305. STRATEGIC FUELS RESERVE.
The Energy Policy and Conservation Act is amended--
(1) in section 2(2) (42 U.S.C. 6201(2)), by striking
``Strategic Petroleum Reserve'' and inserting
``Strategic Fuels Reserve'';
(2) in section 3 (42 U.S.C. 6202)--
(A) in paragraph (8)(C), by striking
``petroleum products'' each place it appears
and inserting ``fuel products''; and
(B) by adding at the end the following new
paragraph:
``(11) The term `fuel products' means petroleum
products and alternative fuels, including ethanol and
biodiesel.'';
(3) in title I (42 U.S.C. 6212 et seq.) by striking
``Strategic Petroleum Reserve'' each place it appears
and inserting ``Strategic Fuels Reserve'';
(4) in part B of title I (42 U.S.C. 6231 et seq.)--
(A) by striking ``petroleum products'' each
place it appears, including headings (and the
corresponding items in the table of contents),
and inserting ``fuel products'';
(B) by striking ``petroleum product'' each
place it appears, including headings (and the
corresponding items in the table of contents),
and inserting ``fuel product''; and
(C) by striking ``Petroleum products'' each
place it appears and inserting ``Fuel
products'';
(5) in section 165 (42 U.S.C. 6245)--
(A) in paragraph (5), by striking ``of
petroleum'' and inserting ``of fuel''; and
(B) in paragraph (7), by striking ``Petroleum
Accounts'' and inserting ``Fuel Accounts''; and
(6) in section 167 (42 U.S.C. 6247)--
(A) in the section heading (and the
corresponding item in the table of contents),
by striking ``SPR Petroleum'' and inserting
``SFR Fuel''; and
(B) in subsection (a), by striking ``SPR
Petroleum'' and inserting ``SFR Fuel''.
----------
13. An Amendment To Be Offered by Representative Conaway of Texas, or
His Designee, Debatable for 10 Minutes
In title III, subtitle B, add at the end the following new
section:
SEC. 334. OIL, GAS, AND MINERAL INDUSTRY WORKERS.
Congress recognizes that a critical component in meeting
expanded domestic oil and gas supplies is the availability of
adequate numbers of trained and skilled workers who can
undertake the difficult, complex, and often hazardous tasks to
bring new supplies into production. Years of volatility in oil
and gas prices, and uncertainty over Federal policy on access
to resources, has created a severe shortage of skilled workers
for the oil and gas industry. To address this shortage, the
Secretary of Energy, in consultation with the Secretary of
Labor, shall evaluate both the short term and longer term
availability of skilled workers to meet the energy security
requirements of the United States, addressing the availability
of skilled labor at both entry level and at more senior levels
in the oil, gas, and mineral industries. Within twelve months
of the date of enactment of this Act, the Secretary of Energy,
the Secretary of Labor, and the Secretary of the Interior shall
submit to Congress a report with recommendations as appropriate
to meet the future labor requirements for the domestic
extraction industries.
----------
14. An Amendment To Be Offered by Representative Solis of California,
or Her Designee, Debatable for 10 Minutes
Strike subtitle D of title III (relating to refinery
revitalization) and make the necessary conforming changes in
the table of contents.
----------
15. An Amendment To Be Offered by Representative Udall of New Mexico,
or His Designee, Debatable for 10 Minutes
Strike section 631 (and amend the table of contents
accordingly).
----------
16. An Amendment To Be Offered by Representative Ford of Tennessee, or
His Designee, Debatable for 10 Minutes
In title VII, subtitle B, part 1, add at the end the
following new section:
SEC. 713. EFFICIENT HYBRID AND ADVANCED DIESEL VEHICLES.
(a) Program.--The Administrator of the Environmental
Protection Agency shall establish a program to encourage
domestic production and sales of efficient hybrid and advanced
diesel vehicles. The program shall include grants to domestic
automobile manufacturers to--
(1) encourage production of efficient hybrid and
advanced diesel vehicles; and
(2) provide consumer incentives, including discounts
and rebates, for the purchase of efficient hybrid and
advanced diesel vehicles.
(b) Authorization of Appropriations.--There are authorized to
be appropriated to the Administrator of the Environmental
Protection Agency for carrying out this section $300,000,000
for each of the fiscal years 2006 through 2015.
----------
17. An Amendment To Be Offered by Representative Kaptur of Ohio, or Her
Designee, Debatable for 10 Minutes
In section 722(a), strike ``15'' and insert ``20''.
In section 722(e)(1), strike ``$20,000,000'' and
``$15,000,000''.
----------
18. An Amendment To Be Offered by Representative Millender-McDonald of
California, or Her Designee, Debatable for 10 Minutes
In title VII, after section 743 insert the following new
section and make the necessary conforming changes in the table
of contents:
SEC. 743A. DIESEL TRUCK RETROFIT AND FLEET MODERNIZATION PROGRAM.
(a) Establishment.--The Administrator of the Environmental
Protection Agency, in consultation with the Secretary of
Energy, shall establish a program for awarding grants on a
competitive basis to public agencies and entities for fleet
modernization programs including installation of retrofit
technologies for diesel trucks.
(b) Eligible Recipients.--A grant shall be awarded under this
section only to a State or local government or an agency or
instrumentality of a State or local government or of two or
more State or local governments who will allocate funds, with
preference to ports and other major hauling operations.
(c) Awards.--
(1) In general.--The Administrator shall seek, to the
maximum extent practicable, to ensure a broad
geographic distribution of grants under this section.
(2) Preferences.--In making awards of grants under
this section, the Administrator shall give preference
to proposals that--
(A) will achieve the greatest reductions in
emissions of nonmethane hydrocarbons, oxides of
nitrogen, and/or particulate matter per
proposal or per truck; or
(B) involve the use of Environmental
Protection Agency or California Air Resources
Board verified emissions control retrofit
technology on diesel trucks that operate solely
on ultra-low sulfur diesel fuel after September
2006.
(d) Conditions of Grant.--A grant shall be provided under
this section on the conditions that--
(1) trucks which are replacing scrapped trucks and on
which retrofit emissions-control technology are to be
demonstrated--
(A) will operate on ultra-low sulfur diesel
fuel where such fuel is reasonably available or
required for sale by State or local law or
regulation;
(B) were manufactured in model year 1998 and
before; and
(C) will be used for the transportation of
cargo goods especially in port areas or used in
goods movement and major hauling operations;
(2) grant funds will be used for the purchase of
emission control retrofit technology, including State
taxes and contract fees; and
(3) grant recipients will provide at least 5 percent
of the total cost of the retrofit, including the
purchase of emission control retrofit technology and
all necessary labor for installation of the retrofit,
from any source other than this section.
(e) Verification.--Not later than 90 days after the date of
enactment of this Act, the Administrator shall publish in the
Federal Register procedures to--
(1) make grants pursuant to this section;
(2) verify that trucks powered by ultra-low sulfur
diesel fuel on which retrofit emissions-control
technology are to be demonstrated will operate on
diesel fuel containing not more than 15 parts per
million of sulfur after September 2006; and
(3) verify that grants are administered in accordance
with this section.
(f) Authorization of Appropriations.--There are authorized to
be appropriated to the Administrator to carry out this section,
to remain available until expended the following sums:
(1) $20,000,000 for fiscal year 2005.
(2) $35,000,000 for fiscal year 2006.
(3) $45,000,000 for fiscal year 2007.
(4) Such sums as are necessary for each of fiscal
years 2008 and 2009.
----------
19. An Amendment To Be Offered by Representative Blumenauer of Oregon,
or His Designee, Debatable for 10 Minutes
In title VII, subtitle D, after section 754, insert the
following new section (and amend the table of contents
accordingly):
SEC. 755. CONSERVE BY BICYCLING PROGRAM.
(a) Definitions.--In this section:
(1) Program.--The term ``program'' means the Conserve
by Bicycling Program established by subsection (b).
(2) Secretary.--The term ``Secretary'' means the
Secretary of Transportation.
(b) Establishment.--There is established within the
Department of Transportation a program to be known as the
``Conserve by Bicycling Program''.
(c) Projects.--
(1) In general.--In carrying out the program, the
Secretary shall establish not more than 10 pilot
projects that are--
(A) dispersed geographically throughout the
United States; and
(B) designed to conserve energy resources by
encouraging the use of bicycles in place of
motor vehicles.
(2) Requirements.--A pilot project described in
paragraph (1) shall--
(A) use education and marketing to convert
motor vehicle trips to bicycle trips;
(B) document project results and energy
savings (in estimated units of energy
conserved);
(C) facilitate partnerships among interested
parties in at least 2 of the fields of--
(i) transportation;
(ii) law enforcement;
(iii) education;
(iv) public health;
(v) environment; and
(vi) energy;
(D) maximize bicycle facility investments;
(E) demonstrate methods that may be used in
other regions of the United States; and
(F) facilitate the continuation of ongoing
programs that are sustained by local resources.
(3) Cost sharing.--At least 20 percent of the cost of
each pilot project described in paragraph (1) shall be
provided from State or local sources.
(d) Energy and Bicycling Research Study.--
(1) In general.--Not later than 2 years after the
date of enactment of this Act, the Secretary shall
enter into a contract with the National Academy of
Sciences for, and the National Academy of Sciences
shall conduct and submit to Congress a report on, a
study on the feasibility of converting motor vehicle
trips to bicycle trips.
(2) Components.--The study shall--
(A) document the results or progress of the
pilot projects under subsection (c);
(B) determine the type and duration of motor
vehicle trips that people in the United States
may feasibly make by bicycle, taking into
consideration factors such as--
(i) weather;
(ii) land use and traffic patterns;
(iii) the carrying capacity of
bicycles; and
(iv) bicycle infrastructure;
(C) determine any energy savings that would
result from the conversion of motor vehicle
trips to bicycle trips;
(D) include a cost-benefit analysis of
bicycle infrastructure investments; and
(E) include a description of any factors that
would encourage more motor vehicle trips to be
replaced with bicycle trips.
(e) Authorization of Appropriations.--There is authorized to
be appropriated to carry out this section $6,200,000, to remain
available until expended, of which--
(1) $5,150,000 shall be used to carry out pilot
projects described in subsection (c);
(2) $300,000 shall be used by the Secretary to
coordinate, publicize, and disseminate the results of
the program; and
(3) $750,000 shall be used to carry out subsection
(d).
----------
20. An amendment To Be Offered by Representative Jackson-Lee of Texas,
or Her Designee, Debatable for 10 Minutes
In section 910, add at the end the following new subsection:
(h) Integrated Bioenergy Research and Development.--In
addition to amounts otherwise authorized by this section, there
are authorized to be appropriated to the Secretary for
integrated bioenergy research and development programs,
projects, and activities, $49,000,000 for each of the fiscal
years 2005 through 2009. Activities funded under this
subsection shall be coordinated with ongoing related programs
of other Federal agencies, including the Plant Genome Program
of the National Science Foundation. Of the funds authorized
under this subsection, at least $5,000,000 for each fiscal year
shall be for training and education targeted to minority and
social disadvantaged farmers and ranchers.
----------
21. An Amendment To Be Offered by Representative Tom Davis of Virginia,
or His Designee, Debatable for 10 Minutes
Strike section 978 (and conform the table of contents
accordingly).
----------
22. An Amendment To Be Offered by Representative Walsh of New York, or
His Designee, Debatable for 10 Minutes
SEC. 1452. NATIONAL PRIORITY PROJECT DESIGNATION.
(a) Definitions.--For purposes of this section:
(1) Secretary.--The term ``Secretary'' means the
Secretary of Energy.
(2) Department.--The term ``Department'' means the
Department of Energy.
(b) Designation of National Priority Projects.--
(1) In general.--There is hereby established the
National Priority Project designation, which shall be
evidenced by a medal bearing the inscription ``National
Priority Project''. The medal shall be of such design
and materials and bear such additional inscriptions as
the President may prescribe.
(2) Making and presentation of designation.--
(A) In general.--The President, on the basis
of recommendations made by the Secretary, shall
annually designate organizations, if any, that
have--
(i) advanced the field of renewable
energy technology and contribute to
North American energy independence; and
(ii) a project that has been
certified by the Secretary under
subsection (c).
(B) Presentation.--The President shall
designate projects with such ceremonies as the
President may prescribe.
(C) Use of designation.--An organization that
receives a designation under this section may
publicize its designation as a National
Priority Project in its advertising.
(D) Categories in which the designation may
be given.--Separate designations shall be made
to qualifying projects in each of the following
categories:
(i) Renewable energy generation
projects.
(ii) Energy efficient and renewable
energy building projects.
(c) Application and Certification.--
(1) Selection criteria.--Certification and selection
of the projects to receive the designation shall be
based on the following criteria:
(A) For all projects.--The project
demonstrates that it will install no less than
30 megawatts of renewable energy generation
capacity.
(B) For energy efficient building and
renewable energy projects.--In addition to
meeting the criteria established in
subparagraph (A), building projects shall--
(i) comply with nationally recognized
standards for high-performance,
sustainable buildings;
(ii) utilize whole-building
integration of energy efficiency and
environmental performance design and
technology, including advanced building
controls;
(iii) utilize renewable energy for at
least 50 percent of its energy
consumption;
(iv) comply with applicable Energy
Star standards; and
(v) include at least 5,000,000 square
feet of enclosed space.
(2) Application.--
(A) Initial applications.--No later than 4
months after the date of enactment of this Act,
and annually thereafter, the Secretary shall
publish in the Federal Register an invitation
and guidelines for submitting applications,
consistent with the provisions of this section.
(B) Contents.--The application shall describe
the project, or planned project, and its plans
to meet the criteria listed in paragraph (1).
(3) Certification.--Not later than 60 days after the
application period described in paragraph (2), the
Secretary shall certify projects that are reasonably
expected to meet the criteria described in paragraph
(1).
----------
23. An Amendment To be Offered by Representative Engel of New York, or
His Designee, Debatable for 10 Minutes
In section 1512, in the section heading, strike ``CELLULOSIC
BIOMASS AND WASTE-DERIVED ETHANOL CONVERSION ASSISTANCE''
insert ``CONVERSION ASSISTANCE FOR CELLULOSIC BIOMASS, WASTE-
DERIVED ETHANOL, APPROVED RENEWABLE FUELS''.
In section 1512, in the proposed subsection (r), in the
subsection heading, strike ``Cellulosic Biomass and Waste-
derived Ethanol Conversion Assistance'' and insert ``Conversion
Assistance for Cellulosic Biomass, Waste-derived Ethanol,
Approved Renewable Fuels''.
In section 1512, in the proposed subsection (r)(1), strike
``waste-derived ethanol'' and insert ``, waste-derived ethanol,
and approved renewable fuels''.
In section 1512, in the proposed subsection (r)(1), insert
``or approved renewable fuels'' after ``production of
ethanol''.
In section 1512, in the proposed subsection (r)(2)(B), insert
``or renewable'' after ``uses cellulosic''.
In section 1512, in the proposed subsection (r), insert after
paragraph (3) the following new paragraph:
``(4) Definitions.--For the purposes of this
subsection:
``(A) The term `approved renewable fuels' are
fuels and components of fuels that have been
approved by the Department of Energy, as
defined in section 301 of the Energy Policy Act
of 1992 (42 U.S.C. 13211)), which have been
made from renewable biomass.
``(B) The term `renewable biomass' is, as
defined in Presidential Executive Order 13134,
published in the Federal Register on August 16,
1999, any organic matter that is available on a
renewable or recurring basis (excluding old-
growth timber), including dedicated energy
crops and trees, agricultural food and feed
crop residues, acquatic plants, animal wastes,
wood and wood residues, paper and paper
residues, and other vegetative waste materials.
Old-growth timber means timber of a forest from
the late successional stage of forest
development.''.
----------
24. An Amendment To Be Offered by Representative Israel of New York, or
His Designee, Debatable for 10 Minutes
At the end of title XVI, add the following new section:
SEC. 1614. CONSOLIDATION OF GASOLINE INDUSTRY.
(a) In General.--The Comptroller General of the United States
shall conduct a study of the consolidation of the refiners,
importers, producers, and wholesalers of gasoline with the
sellers of such gasoline at retail. The study shall include an
analysis of the impact of such consolidation on--
(1) the retail price of gasoline,
(2) small business ownership,
(3) other corollary effects on the market economy of
fuel distribution,
(4) local communities, and
(5) other market impacts of such consolidation.
(b) Submission to Congress.--The Comptroller General shall
submit such study to the Congress not later than one year after
the date of the enactment of this Act.
----------
25. An Amendment To Be Offered by Representative Kucinich of Ohio, or
His Designee, Debatable for 10 Minutes
In title XVI, add at the end the following new section (and
amend the table of contents accordingly):
SEC. 1614. FEASIBILITY STUDY OF MUSTARD SEED BIODIESEL.
(a) Study.--The Secretary of Energy shall enter into an
arrangement with the National Academy of Sciences for a study
to determine the feasibility of using of mustard seed as a
feedstock for biodiesel.
(b) Contents.--The study shall include comparisons to other
biodiesel feedstocks using the following criteria:
(1) Economics from crop production to biodiesel in
the typical percentage blends.
(2) Adaptability to various geographic and
agricultural regions in the United States.
(3) Percentage and quality of oil content.
(4) Cetene ratings, viscosity ratings, emissions for
the typical percentage blends.
(5) Potential to enhance oil, pesticide and herbicide
qualities.
(6) Process technologies to convert into biodiesel.
(7) Usefulness of byproducts from the conversion
process.
(8) Other criteria the National Academy of Sciences
considers pertinent.
(c) Report to Congress.--Not later than 1 year after the date
of enactment of this Act, the National Academy of Sciences
shall transmit results of the study to Congress, the Secretary
of Energy, and the Secretary of Agriculture, including any
findings and recommendations.
----------
26. An Amendment To Be Offered by Representative Holt of New Jersey, or
His Designee, Debatable for 10 Minutes
In title XVI, add at the end the following new section (and
amend the table of contents accordingly):
SEC. 1614. STUDY OF FUEL SAVINGS FROM INFORMATION TECHNOLOGY FOR
TRANSPORTATION.
Not later than 2 years after the date of enactment of this
Act, the Secretary of Energy shall, in consultation with the
Secretary of Transportation, report to Congress on the
potential fuel savings from information technology systems that
help businesses and consumers to plan their travel and avoid
delays. These systems may include web-based real-time transit
information systems, congestion information systems, carpool
information systems, parking information systems, freight route
management, and traffic management systems. The report shall
include analysis of fuel savings, analysis of system costs,
assessment of local, State, and regional differences in
applicability, and evaluation of case studies, best practices,
and emerging technologies from both the private and public
sector.
----------
27. An Amendment To Be Offered by Representative Grijalva of Arizona,
or His Designee, Debatable for 10 Minutes
Strike section 2005.
----------
28. An Amendment To Be Offered by Representative Inslee of Washington,
or His Designee, Debatable for 10 Minutes
At the end of title XXVI add the following:
SEC. __. LIMITATION ON RENT AND OTHER CHARGES WITH RESPECT TO WIND
ENERGY DEVELOPMENT PROJECTS ON PUBLIC LANDS.
(a) In General.--The Secretary of the Interior may not impose
rent and other charges, excluding for the cost of processing
rights-of-way, with respect to any wind energy development
project on public lands that, in the aggregate, exceed 50
percent of the maximum amount of rent that could be charged
with respect to that project under the terms of Bureau of Land
Management Instruction Memorandum No. 2003-020, dated October
16, 2002.
(b) Termination.--Subsection (a) shall not apply after the
earlier of--
(1) the date on which the Secretary of the Interior
determines there exists at least 10,000 megawatts of
electricity generating capacity from non-hydropower
renewable energy resources on public lands; or
(2) the end of the 10-year period beginning on the
date of the enactment of this Act.
(c) State Share not Affected.--This section shall not affect
any State share of rent and other charges with respect to any
wind energy development project on public lands.
----------
29. An Amendment To Be Offered by Representative Hastings of Florida,
or His Designee, Debatable for 10 Minutes
At the end of the bill, add the following new title:
TITLE XXVII--ENVIRONMENTAL JUSTICE
SEC. 2701. EXECUTIVE ORDER 12898.
The provisions of Executive Order 12898, dated February 11,
1994, pertaining to Federal actions to address environmental
justice in minority populations and low-income populations,
shall remain in force until changed by law. In carrying out
such executive order, the provisions of this title shall apply.
SEC. 2702. ADDITIONAL PROVISIONS RELATING TO ENVIRONMENTAL JUSTICE.
(a) Definition of Environmental Justice.--For purposes of
Executive Order 12898, environmental justice is the fair
treatment and meaningful involvement of all people regardless
of race, color, national origin, educational level, or income
with respect to the development, implementation, and
enforcement of environmental laws, regulations, and policies.
Environmental justice seeks to ensure that minority and low-
income communities have adequate access to public information
relating to human health and environmental planning,
regulations, and enforcement. Environmental justice ensures
that no population, especially the elderly and children, are
forced to shoulder a disproportionate burden of the negative
human health and environmental impacts of pollution or other
environmental hazard.
(b) Identification and Prioritization of Environmental
Justice Communities.--For purposes of Executive Order 12898,
criteria for defining an environmental justice community shall
include demographic characteristics, such as percentages of
minority and low-income residents within an area, as well as--
(1) health vulnerabilities, such as cancer mortality
and incidence rate, infant mortality, low birth weight,
asthma, and childhood lead poisoning; and
(2) environmental conditions, such as facility
density and proximity to Corrective Action/Superfund
Sites, Enforcement Data (percent and number of
uninspected facilities, percent and number of
unaddressed violations, average and total penalty and
air nonattainment status), emissions, attainment
status, indoor air issues, 305b stream data, fish
advisories, beach closings, and truck traffic.
(c) Establishment of Offices of Environmental Justice.--For
purposes of Executive Order 12898, each of the following shall
establish an Office of Environmental Justice:
(1) Department of Health and Human Services.
(2) Department of Housing and Urban Development.
(3) Department of Defense.
(4) Department of Labor.
(5) Department of Agriculture.
(6) Department of Transportation.
(7) Department of Justice.
(8) Department of the Interior.
(9) Department of Commerce.
(10) Department of Energy.
(11) Environmental Protection Agency.
(12) Office of Management and Budget.
(13) Office of Science and Technology Policy.
(14) Office of the Deputy Assistant to the President
for Environmental Policy.
(15) Office of the Assistant to the President for
Domestic Policy.
(16) National Economic Council.
(17) Council of Economic Advisers.
(18) Such other Government officials as the President
may designate.
(d) Integration of Environmental Justice Policies in Agency
Actions.--For purposes of the environmental justice strategies
developed by agencies under Executive Order 12898, each agency
shall integrate the strategy into the operation and mission of
the agency and explicitly address compliance with this Act,
including in the following activities:
(1) Future rulemaking activities.
(2) The development of any future guidance,
environmental reviews (including NEPA, CAA, Federal
Land Policy Act), regulation, or procedures for Federal
agency programs, policies, or activities that affect
human health or the environment.
(e) Interagency Federal Working Group Coordination and
Guidance.--The interagency Federal Working Group on
Environmental Justice (in this section referred to as the
``Working Group'') shall--
(1) coordinate an integrated environmental justice
training plan for the Federal agencies and offices
listed in subsection (c);
(2) formalize public participation efforts;
(3) survey the Federal agencies and offices to
determine what is effective and how to best facilitate
outreach without duplicating efforts;
(4) develop a strategy for allocating
responsibilities and ensuring participation, even when
faced with competing agency priorities; and
(5) coordinate plans to communicate research results
so reporting and outreach activities produce more
useful and timely information.
(f) Agency Public Participation Efforts.--
(1) Outreach efforts.--Each Federal agency listed in
subsection (c) shall carry out and report outreach
activities to the Working Group, including the
following:
(A) Respond directly to inquiries from the
public and other stakeholders.
(B) Maintain websites and listservers.
(C) Produce and distribute hardcopy documents
and multimedia products.
(D) Conduct or sponsor briefings, lectures,
and press conferences.
(E) Testify before Congress or other
government bodies.
(F) Finance scholarships, fellowships, and
internships.
(G) Support museum exhibits and other public
displays.
(H) Sponsor, participate, or otherwise
contribute to meetings attended by
stakeholders.
(I) Provide scientifically-sound content for
K-12 education activities; and
(J) fund outreach efforts managed outside the
Federal Government.
(2) Stakeholders.--To ensure their active public
participation and to provide input early in
environmental decision-making, Federal agencies along
with the Working Group shall develop ways to enhance
partnerships and coordination with stakeholders,
including affected communities, Federal, Tribal, State,
and local governments, environmental organizations,
nonprofit organizations, academic institutions
(including Historically Black Colleges and Universities
(HBCUs), Hispanic Serving Institutions (HSIs), and
Tribal Colleges), and business and industry.
(g) Community Technology Centers.--
(1) In general.--Federal agencies shall fund
community technology centers to assist with technical
assistance issues in the environmental justice area.
(2) Description.--In this subsection, the term
``community technology center'' (CTC) refers to
programs with the goal of providing at least 10 hours
of open access a week for anyone in a community,
especially youth and adults in low-income urban and
rural communities, for purposes of providing technical
assistance to communities experiencing issues of
environmental hazards.
(3) Location.--A community technology center may be
located in places such as libraries, community centers,
schools, churches, social service agencies, low-income
residential housing complexes, and Minority Academic
Institutions (such as Historically Black Colleges and
Universities, Hispanic Serving Institutions, and Tribal
Colleges).
(4) Activities of community technology center.--A
community technology center funded under this section
shall--
(A) assist community members in becoming
active participants in cleanup and
environmental development activities;
(B) provide independent and credible
technical assistance to communities affected by
hazardous waste contamination;
(C) review and interpret technical documents
and other materials;
(D) sponsor workshops, short courses, and
other learning experiences to explain basic
science and environmental policy;
(E) inform community members about existing
technical assistance materials, such as
publications, videos, and web sites;
(F) offer training to community leaders in
facilitation and conflict resolution among
stakeholders; and
(G) create technical assistance materials
tailored to the identified needs of a
community.
----------
30. An Amendment To Be Offered by Representative Castle of Delaware, or
His Designee, Debatable for 10 Minutes
In title III, strike section 320, and make the necessary
conforming changes in the table of contents.