PERKINS COUNTY RURAL WATER SYSTEM ACT OF 1999
_______
March 17, 1999.--Ordered to be printed
_______
Mr. Murkowski, from the Committee on Energy and Natural Resources
submitted the following
R E P O R T
[To accompany S. 243]
The Committee on Energy and Natural Resources, to which was
referred the bill (S. 243) to authorize the construction of the
Perkins County Rural Water System and authorize financial
assistance to the Perkins County Rural Water System, Inc., a
nonprofit corporation, in the planning and construction of the
water supply system, and for other purposes, having considered
the same, reports favorably thereon without amendment and
recommends that the bill do pass.
purpose of the measure
The purpose of S. 243, as ordered reported, is to authorize
grants for the construction of a rural water system in Perkins
County, South Dakota.
background and need
Perkins County is located in Northwest South Dakota on the
border with North Dakota. Like many areas in the High Plains,
there are insufficient water supplies of reasonable quality and
those that are available do not meet minimum health and safety
standards. In 1982 a study was undertaken on the feasibility of
building a system that could connect with the proposed
Southwest Pipeline Project in North Dakota, a part of the
Garrison Diversion Conservancy District. Under the North Dakota
Century Law, a Perkins County connection was included under the
original authorization for the Southwest Water Authority. In
the early 1990's, South Dakota provided the funds for a
feasibility study on an 80-20 match with the County. The
feasibility study was completed in 1994 and showed that
obtaining water from the Southwest Water Authority was the most
feasible option and that the system would cost approximately
$20 million. As part of the original agreement with North
Dakota, Perkins County would be able to obtain water at the
operation and maintenance cost if it furnished about $5.5
million to increase the pipe capacity to provide 400 gallons/
minute. Since Southwest is an ongoing project, $440,000 was
provided in 1996 and $550,000 in 1997. An additional $4.5
million will need to be provided to North Dakota during
construction of the Perkins County connection to reimburse work
already completed. The legislation provides for a 75-25
Federal-local cost share with a total authorization of $15
million.
legislative history
S. 243 was introduced on January 19, 1999 by Senator
Johnson. S. 243 is identical to the version of S. 2117 that
passed the Senate in the 105th Congress. A hearing was held on
S. 2117 by the Subcommittee on Water and Power on July 14, 1998
and the bill was ordered reported by the Committee on September
23, 1998. (Report 105-368) S. 2117 passed the Senate by
Unanimous Consent on October 7, 1998.
At its business meeting on March 4, 1999, the Committee on
Energy and Natural Resources ordered S. 243 favorably reported.
committee recommendations
The Committee on Energy and Natural Resources, in open
business session on March 4, 1999, by a unanimous voice vote of
a quorum present, recommends that the Senate pass S. 243, as
described herein.
section-by-section analysis
Section 1 provides a short title.
Section 2 provides a series of findings and purposes.
Section 3 provides a series of definitions.
Section 4(a) authorizes grants from the Secretary of the
Interior for planning and construction of the system and for
repairs to the existing distribution system to promote
conservation and efficiency.
Subsection (b) defines the service area as Perkins County,
South Dakota.
Subsection (c) provides that grants may not exceed the
Federal share (which is defined as 75% under section 9).
Subsection (d) prohibits any obligation of funds until
requirements of the National Environmental Policy Act are met
and a final engineering report is submitted to and lays before
Congress for 90 days. The inclusion of a provision providing
that the requirements of the National Environmental Policy Act
must be met is not intended to suggest that such requirements
would not apply in the absence of the provision nor to suggest
that a full Environmental Impact Statement or even an
Environmental Assessment would be necessary.
Section 5 provides standard language on mitigation for fish
and wildlife losses.
Section 6(a) provides that the Western Area Power
Administration (WAPA) will make power available for pumping
from Pick-Sloan power designated for future irrigation and
drainage pumping.
Subsection (b) makes the provision of power contingent on
the system being operated on a not-for-profit basis, that the
power be purchased from a qualified preference customer of
WAPA, the rate schedule be the firm power rate at the time of
delivery by WAPA, and that the preference customer pass through
the firm rate, adding only other customary and usual charges.
Section 7 provides that the Act does not affect any other
water project in North or South Dakota.
Section 8 provides a series of savings provisions on water
rights.
Section 9 provides that the Federal share will be 75% of
costs.
Section 10 provides that the local share will be 25% of
costs.
Section 11 authorizes the Secretary of the Interior to
provide construction oversight and limitsexpenditures by the
Secretary to 3% of the construction budget.
Section 12 authorizes $15 million subject to appropriate
engineering cost indices.
cost and budgetary considerations
The following estimate of the cost of this measure has been
provided by the Congressional Budget Office:
U.S. Congress,
Congressional Budget Office,
Washington, DC, March 11, 1999.
Hon. Frank H. Murkowski,
Chairman, Committee on Energy and Natural Resources,
U.S. Senate, Washington, DC.
Dear Mr. Chairman: The Congressional Budget Office has
prepared the enclosed cost estimate for S. 243, the Perkins
County Rural Water System Act of 1999.
If you wish further details on this estimate, we will be
pleased to provide them. The CBO staff contacts are Gary Brown
(for federal costs), and Marjorie Miller (for the state and
local impact.
Sincerely,
Dan L. Crippen, Director.
Enclosure.
congressional budget office cost estimate
S. 243--Perkins County Rural Water System Act of 1999
Summary: S. 243 would authorize the Secretary of the
Interior, acting through the Bureau of Reclamation (the
bureau), to provide financial assistance to the Perkins County
Rural Water System, Inc., for planning and constructing the
Perkins County Rural Water System. To carry out these
activities, the bill would authorize the appropriation of $15
million in 1995 dollars plus additional amounts to cover
increases in project costs during construction. The system
would provide water to members of the Perkins County Rural
Water System, Inc., in Perkins County, South Dakota.
CBO estimates that implementing S. 243 would require
appropriations of $18 million over the 2000-2004 period. We
estimate that outlays would total $16 million over that period
and $2 million after 2004. Enacting the bill would not affect
direct spending or receipts; therefore, pay-as-you-go
procedures would not apply.
S. 243 contains no intergovernmental private-sector
mandates as defined in the Unfunded Mandates Reform Act (UMRA).
State and local governments might incur some costs as a result
of the bill's enactment, but these costs would be voluntary.
Estimated cost to the Federal Government: The estimated
budgetary impact of S. 243 is shown in the following table. The
costs of this legislation fall within budget function 300
(natural resources and environment).
------------------------------------------------------------------------
By fiscal year, in millions of
dollars--
---------------------------------------
2000 2001 2002 2003 2004
------------------------------------------------------------------------
SPENDING SUBJECT TO APPROPRIATION
Estimated authorization level... 1 3 5 5 4
Estimated outlays............... 1 2 4 5 4
------------------------------------------------------------------------
Basis of estimate: For the purpose of this estimate, CBO
assumes that the bill will be enacted by the end of fiscal year
1999 and that the estimated amounts necessary to implement the
bill will be appropriated for each year. Based on information
provided by the bureau, CBO anticipates that environmental and
engineering studies for the project would be completed by the
end of fiscal year 2001, that construction would begin in 2002,
and that the project would be completed by 2006. (The bureau
has indicated that it would take between three and five years
to complete the project.) The estimated amounts of annual
funding needed to meet this schedule are based on information
provided by the bureau.
The total estimated cost of $18 million over the 2000-2004
period reflects observed inflation from 1995 through 1998 and
estimated inflation for 1999 through 2004. CBO estimates that
inflation of between 2 percent and 3 percent a year would
increase the project's total cost from $15 million in 1995
dollars to about $18 million, assuming appropriation of the
necessary amounts over the 2000-2004 period. The estimated
outlays are based on historical rates of spending for the types
of activities authorized by the bill. The Perkins County Rural
Water System, Inc. would bear the cost of operating and
maintaining the project.
Pay-as-you-go considerations: None.
Estimated impact on state, local, and tribal governments:
S. 243 contains no intergovernmental mandates as defined in
UMRA. The bill would set the nonfederal share of project costs
at 25 percent. Any state or local governments choosing to
participate in the project would do so on a voluntary basis.
Estimated impact on the private sector: This bill contains
no new private-sector mandate as defined in UMRA.
regulatory impact evaluation
In compliance with paragraph 11(b) of rule XXVI of the
Standing Rules of the Senate, the Committee makes the following
evaluation of the regulatory impact which would be incurred in
carrying out S. 243. The bill is not a regulatory measure in
the sense of imposing Government-established standards or
significant economic responsibilities on private individuals
and businesses.
No personal information would be collected in administering
the program. Therefore, there would be no impact on personal
privacy.
Little, if any, additional paperwork would result from the
enactment of S. 243, as ordered reported.
executive communications
On March 11, 1999, the Committee on Energy and Natural
Resources requested legislative reports from the Department of
the Interior and the Office of Management and Budget setting
forth Executive agency recommendations on S. 243. These reports
had not been received at the time the report on S. 243 was
filed. When the reports become available, the Chairman will
request that they be printed in the Congressional Record for
the advice of the Senate.
changes in existing law
In compliance with paragraph 12 of rule XXVI of the
Standing Rules of the Senate, the Committee notes that no
changes in existing law are made by the bill S. 243, as ordered
reported.