DAMS
Articles and editorials
Reality on the River, H5771 [13JY]
Bills and resolutions
Bureau of Reclamation: assist in the implementation of fish passage and screening facilities at non-Federal water projects (see S. 232), S738 [1FE]
———authorize participation in the rehabilitation of Wallowa Lake Dam in Oregon (see S. 231), S738 [1FE]
Columbia River: ensure salmon and steelhead preservation, maintain reasonably priced and reliable power, and conduct studies on the impact of dams on salmon and steelhead on the endangered species list (see H.R. 1615), H1968 [13AP]
Corps of Engineers: authorize the conduct of small projects for the rehabilitation or removal of dams (see S. 1887), S11559 [19OC] (see H.R. 4226), H9641 [3NO]
———carry out programs and activities to enhance the safety of levees (see H.R. 4650), H13188 [22DE]
Dept. of the Army: convey certain lands to the Dept. of the Interior to be held in trust for the Prairie Island Indian Community (see S. 706), S3200 [5AP] (see H.R. 2186), H3054 [5MY]
Dept. of the Interior: reallocate costs of the Pactola Dam and Reservoir, SD, to reflect increased demands for municipal, industrial, and fish and wildlife purposes (see S. 819), S3735 [15AP] (see H.R. 3967), H8648 [3OC]
———study feasibility of enlarging the Arthur V. Watkins Dam Weber Basin Project, UT (see S. 1811), S10823 [3OC] (see H.R. 3626), H7612 [29JY]
Native Americans: provide compensation to members of the Cheyenne River Sioux Tribe for damage resulting from the Oahe Dam and Reservoir Project (see S. 1535), S9284 [28JY] (see H.R. 3558), H7558 [28JY]
———settlement of claims of the Spokane Tribe of Indians of the Spokane Reservation concerning contributions to production of hydropower by the Grand Coulee Dam (see S. 881), S4108 [21AP] (see H.R. 1797), H2471 [21AP]
Oregon: provide for reimbursement of the cost of certain projects at the Fern Ridge Dam (see S. 2159), S14316 [21DE]
Pick-Sloan Missouri River Basin Program: extend water service contract for the Ainsworth Unit, Sandhills Division in Nebraska (see S. 891), S4151 [22AP] (see H.R. 1197), H1263 [9MR]
Rocky Mountain National Park: designate certain lands as wilderness (see S. 1510), S9158 [27JY] (see H.R. 3193), H5602 [30JN]
States: establish a program to provide grant assistance for the rehabilitation and repair of deficient dams (see H.R. 1105), H982 [3MR]
Victor V. Veysey Dam: designate (see H.R. 1152), H1023 [8MR]
Factsheets
Rocky Mountain National Park Wilderness Act (H.R. 3193), E1443 [1JY]
Remarks in House
Colorado: anniversary of Cheesman Dam, E1894 [20SE]
Corps of Engineers: enhance navigation capacity improvements and ecosystem restoration plan for the Upper Mississippi River and Illinois Waterway System, H5256 [28JN], H5640, H5644 [12JY], H5770 [13JY], H5804, H5813-H5823, H5868, H5873-H5876 [14JY]
Dept. of the Interior: reallocate costs of the Pactola Dam and Reservoir, SD, to reflect increased demands for municipal, industrial, and fish and wildlife purposes (H.R. 3967), E2005 [3OC]
FERC: hydroelectric projects licensing reform, H6963 [28JY]
Mississippi River: require Corps of Engineers report on progress and maintain balance in regards to lock and dam modernization and ecosystem restoration, H5877 [14JY]
Native Americans: provide compensation to members of the Cheyenne River Sioux Tribe for damage resulting from the Oahe Dam and Reservoir Project (H.R. 3558), H9018 [20OC], E1685 [29JY]
———settlement of claims of the Spokane Tribe of Indians of the Spokane Reservation concerning contributions to production of hydropower by the Grand Coulee Dam (H.R. 1797), H6398-H6400 [25JY]
New Mexico: anniversary of Conchas Dam construction, E1663 [29JY]
New Orleans, LA: establish a plan to build a system of levees to avoid future disasters, H8147 [20SE]
Rivers: locks and dams infrastructure funding, H3866 [24MY]
Rocky Mountain National Park: designate certain lands as wilderness (H.R. 3193), E1442 [1JY]
Remarks in Senate
Bureau of Reclamation: assist in the implementation of fish passage and screening facilities at non-Federal water projects (S. 232), S9033 [26JY]
———authorize participation in the rehabilitation of Wallowa Lake Dam in Oregon (S. 231), S9033 [26JY]
———submit report analyzing costs and benefits of constructing the Auburn Dam in Sacramento, CA, S12746 [14NO]
Columbia River: ensure salmon and steelhead preservation, maintain reasonably priced and reliable power, and conduct studies on the impact of dams on salmon and steelhead on the endangered species list, S12744 [14NO]
Corps of Engineers: authorize the conduct of small projects for the rehabilitation or removal of dams (S. 1887), S11561 [19OC]
Dept. of the Army: convey certain lands to the Dept. of the Interior to be held in trust for the Prairie Island Indian Community (S. 706), S9055 [26JY]
Dept. of the Interior: reallocate costs of the Pactola Dam and Reservoir, SD, to reflect increased demands for municipal, industrial, and fish and wildlife purposes (S. 819), S3749 [15AP], S13061 [16NO]
———study feasibility of enlarging the Arthur V. Watkins Dam Weber Basin Project, UT (S. 1811), S10826 [3OC]
Native Americans: settlement of claims of the Spokane Tribe of Indians of the Spokane Reservation concerning contributions to production of hydropower by the Grand Coulee Dam (H.R. 1797), S9057 [26JY], S9202 [27JY]
———settlement of claims of the Spokane Tribe of Indians of the Spokane Reservation concerning contributions to production of hydropower by the Grand Coulee Dam (S. 881), S4129 [21AP]
Pick-Sloan Missouri River Basin Program: extend water service contract for the Ainsworth Unit, Sandhills Division in Nebraska (S. 891), S13061 [16NO]
Reports filed
Arthur V. Watkins Dam Enlargement Act: Committee on Resources (House) (H.R. 3626) (H. Rept. 109-339), H11502 [13DE]
Bureau of Reclamation Assistance in the Implementation of Fish Passage and Screening Facilities at Non-Federal Water Projects: Committee on Energy and Natural Resources (Senate) (S. 232) (S. Rept. 109-31), S2482 [10MR]
Pactola Reservoir Reallocation Authorization Act: Committee on Energy and Natural Resources (Senate) (S. 819) (S. Rept. 109-168), S12005 [27OC]
Pick-Sloan Missouri River Basin Program Ainsworth Unit, Sandhills Division in Nebraska Water Service Contract Extension: Committee on Energy and Natural Resources (Senate) (S. 891) (S. Rept. 109-169), S12006 [27OC]
Spokane Tribe of Indians of the Spokane Reservation Grand Coulee Dam Equitable Compensation Settlement Act: Committee on Indian Affairs (Senate) (S. 881) (S. Rept. 109-200), S13450 [12DE]
———Committee on Resources (House) (H.R. 1797) (H. Rept. 109-150), H5100 [23JN]
Wallowa Lake Dam Rehabilitation and Water Management Act: Committee on Energy and Natural Resources (Senate) (S. 231) (S. Rept. 109-30), S2482 [10MR]
Texts of
H.R. 1797, Spokane Tribe of Indians of the Spokane Reservation Grand Coulee Dam Equitable Compensation Settlement Act, H6398 [25JY]
S. 231, Wallowa Lake Dam Rehabilitation and Water Management Act, S9033 [26JY]
S. 232, assist in the implementation of fish passage and screening facilities at non-Federal water projects, S9033 [26JY]
S. 706, Prairie Island Land Conveyance Act, S3211 [5AP], S9055 [26JY]
S. 819, Pactola Reservoir Reallocation Authorization Act, S3749 [15AP]
S. 819, Pactola Reservoir Reallociation Authorization Act, S13061 [16NO]
S. 891, extend water service contract for the Ainsworth Unit, Sandhills Division of the Pick-Sloan Missouri River Basin Program in Nebraska, S13061 [16NO]