PROSSER, WA
Bills and resolutions
Bureau of Reclamation: study the engineering feasibility of a water exchange in lieu of electrification at the Prosser Diversion Dam Chandler Pumping Plant in Washington (see S. 2163), S1117 [2MR] (see H.R. 3986), H1077 [15MR]
———study the engineering feasibility of a water exchange in lieu of electrification of the Prosser Diversion Dam Chandler Pumping Plant in Washington (H.R. 3986), consideration (see H. Res. 581), H7870 [19SE]
Cost Estimates
Bureau of Reclamation study of a water exchange in lieu of the electrification of the Prosser Diversion Dam Chandler Pumping Plant (H.R. 3986): CBO, E1596 [26SE]
Remarks in House
Bureau of Reclamation: study the engineering feasibility of a water exchange in lieu of electrification of the Prosser Diversion Dam Chandler Pumping Plant in Washington (H.R. 3986), H7747-H7749 [19SE], H7886-H7888 [20SE], E1596 [26SE]
———study the engineering feasibility of a water exchange in lieu of electrification of the Prosser Diversion Dam Chandler Pumping Plant in Washington (H.R. 3986), consideration (H. Res. 581), H7885, H7886 [20SE]
Remarks in Senate
Bureau of Reclamation: study the engineering feasibility of a water exchange in lieu of electrification at the Prosser Diversion Dam Chandler Pumping Plant in Washington (S. 2163), S1124 [2MR], S2644 [12AP]
———study the engineering feasibility of a water exchange in lieu of electrification of the Prosser Diversion Dam Chandler Pumping Plant in Washington (H.R. 3986), S10542 [13OC]
Reports filed
Bureau of Reclamation Study of a Water Exchange in Lieu of the Electrification of the Prosser Diversion Dam Chandler Pumping Plant: Committee on Energy and Natural Resources (Senate) (S. 2163) (S. Rept. 106-488), S9855 [4OC]
———Committee on Resources (House) (H.R. 3986) (H. Rept. 106-864), H7869 [19SE]
Consideration of H.R. 3986, Bureau of Reclamation Study of a Water Exchange in Lieu of the Electrification of the Prosser Diversion Dam Chandler Pumping Plant: Committee on Rules (House) (H. Res. 581) (H. Rept. 106-866), H7870 [19SE]
Texts of
H. Res. 581, consideration of H.R. 3986, Bureau of Reclamation study of a water exchange in lieu of the electrification of the Prosser Diversion Dam Chandler Pumping Plant, H7885 [20SE]
H.R. 3986, Bureau of Reclamation study of a water exchange in lieu of the electrification of the Prosser Diversion Dam Chandler Pumping Plant, H7747 [19SE], H7886 [20SE]