ELECTRIC POWER related term(s) Power Resources
Amendments
FERC: hydroelectric license extension (S. 2384), S14238, S14269 [5OC], H11379 [7OC]
Analyses
Restore State Control Over Allocations and Granting of Water Rights and FERC Control Over Licensing of Hydroelectric Projects (S. 2566), S15240 [30NO]
Articles and editorials
Man and His Plug-In Car and Their American Odyssey, S15445 [1DE]
Truth About Electric Cars, S10591 [4AU]
Water-Energy Link, E2231 [8OC]
Bills and resolutions
Alaska Power Administration: authorize sale (see S. 2383), S11478 [12AU]
Elwha River Ecosystem and Fisheries Restoration Act: amend (see S. 2349; H.R. 4909), S10357 [2AU], H7074 [5AU]
FERC: extension of deadline for construction of hydroelectric project in Ohio (see S. 2502; H.R. 5031), S14242 [5OC], H9157 [13SE]
———extension of deadline for construction of hydroelectric project in Pennsylvania (see S. 2497), S14112 [4OC]
———extension of deadline for construction of hydroelectric projects in Arkansas (see H.R. 5052), H9223 [19SE]
———hydroelectric license extension (see S. 2384; H.R. 4911, 4968), S11478 [12AU], H7074 [5AU], H8505 [16AU]
———restore State control over allocation and granting of water rights and FERC control over licensing of hydroelectric projects (see S. 2566), S15235 [30NO]
LIHEAP: full expenditure of appropriated funds (see H. Con. Res. 202), H296 [7FE]
Power resources: pilot powerplant project regenerating solid waste into electricity for energy intensive industries in depressed communities (see H.R. 4061), H1439 [16MR]
Public utilities: modify exemption to the 4-County Electric Power Association of Mississippi for the purchase of electric power from sources other than the TVA (see S. 2496), S14112 [4OC]
REA: credit for rural electric cooperatives (see H.R. 3773), H204 [2FE]
———protection of rural electric borrowers (see H.R. 3790), H286 [3FE]
Remarks in House
Bonneville Power Administration: reinvention process of power generation for efficiency and cost effectiveness, E2231 [8OC]
FERC: hydroelectric license extension (S. 2384), H11377-H11380 [7OC]
Motor vehicles: development of non-polluting technology, E991 [19MY]
Nuclear energy: U.S. dependence, E377 [8MR]
REA: protection of rural electric borrowers (H.R. 3790), E99 [3FE]
Remarks in Senate
Dept. of Defense: Electric and Hybrid Electric Vehicle Technology Program funding, S8282, S8283 [1JY]
Dept. of Energy: Alaskan village electrical generation systems funding, S8041-S8044 [30JN]
Elwha River Ecosystem and Fisheries Restoration Act: amend (S. 2349), S10358 [2AU]
FERC: extension of deadline for construction of hydroelectric project in Ohio (S. 2502), S14245 [5OC]
———extension of deadline for construction of hydroelectric project in Pennsylvania (S. 2497), S14113 [4OC]
———hydroelectric license extension (S. 2384), S14237, S14238 [5OC]
———restore State control over allocation and granting of water rights and FERC control over licensing of hydroelectric projects (S. 2566), S15237-S15240 [30NO]
Motor vehicle: electric cars relative to development of clean fuel technology, S10591 [4AU]
Motor vehicles: electric car development, S15445 [1DE]
———funding for electric vehicle development, S9712 [26JY]
Power resources: protect consumers of multistate utility systems (S. 544), S15065 [8OC]
Public utilities: modify exemption to the 4-County Electric Power Association of Mississippi for the purchase of electric power from sources other than the TVA (S. 2496), S14112 [4OC]
Reports filed
Alaska Power Administration Sale Authorization: Committee on Energy and Natural Resources (Senate) (S. 2383) (S. Rept. 103-335), S11478 [12AU]
Hydroelectric License Extension: Committee on Energy and Natural Resources (Senate) (S. 2384) (S. Rept. 103-336), S11478 [12AU]
Multistate Utility Company Consumer Protection Act: Committee on Energy and Natural Resources (Senate) (S. 544) (S. Rept. 103-351), S12289 [22AU]
Resolutions by organizations
Modify exemption for the purchase of electric power from sources other than the TVA: 4-County Electric Power Association, S14112 [4OC]
Summaries
Alaskan Village Electrical Generation Systems Funding: Alaska Rural Energy Task Force, S8043 [30JN]
Texts of
S. 2349, Elwha River Ecosystem and Fisheries Restoration Act amendments, S10358 [2AU]
S. 2384, FERC hydroelectric license extension, S14238-S14240 [5OC], H11378 [7OC]
S. 2496, modify exemption to the 4-County Electric Power Association of Mississippi for the purchase of electric power from sources other than the TVA, S14112 [4OC]
S. 2502, extension of deadline for construction of hydroelectric project in Ohio, S14245 [5OC]
S. 2566, restore State control over allocation and granting of water rights and FERC control over licensing of hydroelectric projects, S15240 [30NO]