DAMS

Agreements

Napa and Solano Counties, CA water use, H4812-H4815 [20JN]

Amendments

Buffalo Bill Dam and Reservoir, Shoshone Project, and Pick-Sloan Missouri Basin Program: authorizing additional construction appropriations (H.R. 429), H4809, H4844, H4847, H4848, H4849, H4850, H4853 [20JN]

Buffalo Bill Dam and Reservoir, Shoshone project, and Pick-Sloan Missouri Basin Program: authorizing additional construction appropriations (H.R. 429), S15021 [22OC]

FERC: extension of time on certain licenses (S. 1283), S12133 [2AU]

Analyses

Grand Canyon Protection Act (H.R. 820), E413 [5FE]

Articles and editorials

Power and the Glory—Should We Trade the Grand Canyon's Wonder for Cheap Electricity?, E355 [30JA]

Bills and resolutions

Buffalo Bill Dam and Reservoir, Shoshone Project, and Pick-Sloan Missouri Basin Program: authorizing additional construction appropriations (see H.R. 429, H83 [4JA])

Corps of Engineers: management of the Missouri River (see S. Res. 61, S2256 [22FE])

Federal Water Pollution Control Act: amend relative to State authority on hydropower project certification (see H.R. 3977, H11886 [26NO])

Glen Canyon Dam: implement operating procedures (see H.R. 814, H890 [5FE]; H.R. 820, H890 [5FE]

Indians: implement recommendations of the Garrison Unit Joint Tribal Advisory Committee (see S. 168, S438 [14JA])

Native Americans: Garrison Unit Joint Tribal Advisory Committee recommendations regarding reservation land rights (see H.R. 2414, H3370 [21MY])

Platoro Reservoir and Dam: transfer operation responsibility to the Conejos Water Conservancy District (see S. 926, S4984 [24AP])

Red River Waterway: designate lock and dam 1 as the Lindy Claiborne Boggs lock and dam (see H.R. 508, H386 [11JA])

Tom Miller Dam, Austin, TX: designate (see H.R. 1810, H2260 [16AP])

Tongue River: repair and enlarge dam and settle Northern Cheyenne Tribe water rights claims (see S. 751, S3929 [21MR])

Water: State regulation of resources (see S. 812, S4337 [11AP])

Waterways: place contingencies on the divestiture of certain locks and dams (see H.R. 1564, H2014 [21MR])

Remarks in House

Buffalo Bill Dam and Reservoir, Shoshone Project, and Pick-Sloan Missouri Basin Program: authorizing additional construction appropriations (H.R. 429), H4802-H4854 [20JN]

———authorizing additional construction appropriations (H.R. 429), consideration (H. Res. 178), H4799-H4802 [20JN]

Federal Water Pollution Control Act: amend relative to State authority on hydropower project certification (H.R. 3977), E4119 [26NO]

Native Americans: Garrison Unit Joint Tribal Advisory Committee recommendations regarding reservation land rights (H.R. 2414), E1863 [21MY]

Remarks in Senate

Cody, WY: construction of Buffalo Bill Reservoir, S4110 [22MR]

Corps of Engineers: management of the Missouri River (S. Res. 61), S2266 [22FE]

FERC: extension of time on certain licenses (S. 1283), S12133 [2AU]

———extension of time on certain licenses to acquire real property and commence and complete construction, S12133 [2AU]

Indians: implement recommendations of the Garrison Unit Joint Tribal Advisory Committee (S. 168), S861 [14JA]

Platoro Reservoir and Dam: transfer operation responsibility to the Conejos Water Conservancy District (S. 926), S5027, S5029 [24AP]

Tongue River: repair and enlarge dam and settle Northern Cheyenne Tribe water rights claims (S. 751), S4032 [21MR]

Water: State regulation of resources (S. 812), S4361 [11AP]

Watertown, SD: flood control project funding, S9426 [10JY]

Reports filed

Authorizing Additional Construction Appropriations for Buffalo Bill Dam and Reservoir, Shoshone Project, and Pick-Sloan Missouri Basin Program: Committee on Interior and Insular Affairs (H.R. 429) (H. Rept. 102-114), H4611 [18JN]

Extensions of Time Limitations in Certain FERC Licenses: Committee on Energy and Natural Resources (S. 1283) (S. Rept. 102-109), S10134 [16JY]

Implement Recommendations of the Garrison Unit Joint Tribal Advisory Committee in Reference to Compensation for Taking of Reservation Lands: Committee on the Indian Affairs (Select) (S. 168) (S. Rept. 102-250), S18333 [26NO]

Statements

Buffalo Bill Dam and Reservoir, Shoshone Project, and Pick-Sloan Missouri Basin Program Additional Construction Appropriations (H.R. 429): President Bush Administration, H4800 [20JN]

Tables

Extension of time on certain FERC licenses, S7661 [12JN]

Texts of

H. Res. 178, consideration of H.R. 429, authorizing additional construction appropriations for the Buffalo Bill Dam and Reservoir, Shoshone Project, and Pick-Sloan Missouri Basin Program, H4799 [20JN]

S. 812, State regulation of water resources, S4362 [11AP]

S. 926, transfer operation responsibility of the Platoro Reservoir and Dam to the Conejos Water Conservancy District, S5027 [24AP]

S. 1283, extension of time on certain FERC-issued licenses, S12133 [2AU]

S. Res. 61, Corps of Engineers management of the Missouri River, S2266 [22FE]