[Congressional Record Volume 169, Number 129 (Wednesday, July 26, 2023)]
[Senate]
[Pages S3644-S3665]
From the Congressional Record Online through the Government Publishing Office [www.gpo.gov]

  SA 1056. Mr. WICKER (for himself and Mr. Graham) submitted an 
amendment intended to be proposed by him to the bill S. 2226, to 
authorize appropriations for fiscal year 2024 for military activities 
of the Department of Defense, for military construction, and for 
defense activities of the Department of Energy, to prescribe military 
personnel strengths for such fiscal year, and for other purposes; which 
was ordered to lie on the table; as follows:

       At the appropriate place in the funding tables, insert the 
     following to raise the topline for implementation of the 
     National Defense Strategy and for other purposes:

--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                  FY24 AMT
                ACCOUNT                      LINE                 PE                  SAG         ($1000S)          TITLE/STUB ENTRY           UFR?
--------------------------------------------------------------------------------------------------------------------------------------------------------
MSLS...................................            6  ..........................  ...........          $314.2  PrSM (Inc 1) production    ..............
                                                                                                                increase.
AMMO...................................           36  ..........................  ...........           $20.0  M795 155mm artillery       ..............
                                                                                                                projectile production.
RDA....................................  ...........  0604802A..................  ...........           $20.0  Low-drag artillery         ..............
                                                                                                                guidance kit (XM1210 LR
                                                                                                                PGK).
MSLS...................................           20  ..........................  ...........           $20.0  SB600 production increase  ..............
PDW....................................           78  ..........................  ...........           $10.9  Marinized SB600..........  ..............
MSLS...................................           17  ..........................  ...........          $350.0  Additional 1 Patriot fire  ..............
                                                                                                                unit.
RDDW...................................  ...........  0603881C..................  ...........          $108.0  All Domain Missile         ..............
                                                                                                                Warning and Missile
                                                                                                                Tracking Architecture
                                                                                                                (THAAD).
MSLS...................................           10  ..........................  ...........           $36.0  JAGM capacity expansion..  ..............
RDA....................................  ...........  02065778A.................  ...........           $67.0  GMLRS-ER capacity          ..............
                                                                                                                expansion.
RDA....................................  ...........  0604611A..................  ...........           $29.1  Javelin RDTE for F-model   ..............
                                                                                                                auto gate/fast launch.
MSLS...................................           22  ..........................  ...........           $87.6  Stinger capacity           ..............
                                                                                                                expansion--obsolescence.
PANMC..................................           15  ..........................  ...........          $350.0  Coyote production          ..............
                                                                                                                increase.
RDA....................................  ...........  1160402BB.................  ...........           $27.3  Palletized Field           ..............
                                                                                                                Artillery Launcher.
RDN....................................  ...........  0604227N..................  ...........           $50.0  Harpoon--seeker            ..............
                                                                                                                development obsolescence
                                                                                                                issues.
WPN....................................           23  ..........................  ...........           $20.0  Harpoon--additional test   ..............
                                                                                                                equipment for production
                                                                                                                and missile recert.
WPN....................................           20  ..........................  ...........          $152.0  AARGM-ER production        ..............
                                                                                                                increase.
WPN....................................           20  ..........................  ...........           $34.0  AARGM-ER special test      ..............
                                                                                                                equipment.
WPN....................................           16  ..........................  ...........           $40.0  NSM production increase..  ..............
WPN....................................            7  ..........................  ...........          $180.0  SM-6 obsolescence          ..............
                                                                                                                steering & control.
WPN....................................            7  ..........................  ...........           $30.0  SM-6 obsolescence Plate    ..............
                                                                                                                3A.
WPN....................................            4  ..........................  ...........           $20.0  Tomahawk BlkV throughput   ..............
                                                                                                                expansion.
PDW....................................           33  ..........................  ...........           $63.0  SM-3 Block IIA capacity    ..............
                                                                                                                expansion.
PDW....................................           33  ..........................  ...........          $140.0  SM-3 Block IIA             ..............
                                                                                                                obsolescence.
WPN....................................           27  ..........................  ...........           $65.0  Mk48 Mod 7 AUR and         ..............
                                                                                                                Technology Expansion
                                                                                                                Program.
WPN....................................           27  ..........................  ...........           $40.0  Mk48 Mod 7 further         ..............
                                                                                                                obsolescence fixes.
WPN....................................           29  ..........................  ...........          $121.1  Mk54 Mod 1 kit...........  ..............
WPN....................................           29  ..........................  ...........           $18.6  Mk54 HAAWC kit...........  ..............
WPN....................................           31  ..........................  ...........           $10.0  Indian Head explosive      ..............
                                                                                                                fill production
                                                                                                                expansion.
RDN....................................  ...........  0604601N..................  ...........           $10.0  Indian Head underwater     ..............
                                                                                                                fill testing/quals
                                                                                                                completion.
RDN....................................  ...........  0604601N..................  ...........           $15.0  Hammerhead capability....  ..............
RDN....................................  ...........  9999......................  ...........           $60.0  Classified program.......  ..............
WPN....................................           31  ..........................  ...........            $7.5  Mk68.....................  ..............
WPN....................................           31  ..........................  ...........            $0.4  Mk68 obsolescence........  ..............
RDN....................................  ...........  0603782N..................  ...........           $10.0  ONR capability             ..............
                                                                                                                acceleration.
RDN....................................           51  0603582N..................  ...........           $19.6  PAC-3 MSE/Aegis            ..............
                                                                                                                integration.
MPAF...................................           16  ..........................  ...........          $217.3  GLSDB risk mitigation of   ..............
                                                                                                                current GFE--sensor/
                                                                                                                shooter.
MPAF...................................            8  ..........................  ...........          $160.0  Joint Strike Missile       ..............
                                                                                                                production increase and
                                                                                                                test equipment.
MPAF...................................           12  ..........................  ...........           $20.0  AMRAAM AP................  ..............
WPN....................................            6  ..........................  ...........           $60.0  AIM-9X capacity expansion  ..............
WPN....................................            6  ..........................  ...........          $130.0  AIM-9X production          ..............
                                                                                                                increase (Navy).
MPAF...................................            6  ..........................  ...........          $130.0  AIM-9X production          ..............
                                                                                                                increase (AF).
MPAF...................................            9  ..........................  ...........           $35.0  SDB II capacity expansion  ..............
                                                                                                                to 2100.
MPAF...................................            9  ..........................  ...........           $70.0  SDB II capacity expansion  ..............
                                                                                                                to 3000.
OPN....................................           63  ..........................  ...........          $100.0  Phoenix Ghost CP200......  ..............
WPN....................................           22  ..........................  ...........           $38.0  ABL energetics expansion   ..............
                                                                                                                (GMLRS, PrSM, PAC-3,
                                                                                                                etc).
WPN....................................           23  ..........................  ...........          $125.0  Expansion of solid rocket  ..............
                                                                                                                motor industrial base.
RDDW...................................  ...........  0602000D8Z................  ...........           $35.0  CL-20....................  ..............
MPAF...................................     0708011F  ..........................  ...........          $150.0  Defense Industrial Base    ..............
                                                                                                                (DIB) Expansion for.
                                                                                                               Industrial Preparedness/
                                                                                                                Pollution Prevention AFP-
                                                                                                                44.
RDDW...................................  ...........  0605022D8Z................  ...........           $15.0  Defense exportability      ..............
                                                                                                                features.
RDAF...................................  ...........  0604183F..................  ...........          $133.4  HACM acceleration........  ..............
RDN....................................  ...........  0605518N..................  ...........           $25.0  Mach-TB increase.........  ..............
RDDW...................................  ...........  0603766E..................  ...........          $120.0  Assault Breaker II 4x LOE  ..............
                                                                                                                acceleration.
RDSF...................................         9999  ..........................  ...........           $20.0  Classified space add.....  ..............
RDSF...................................  ...........  1206310SF.................  ...........           $30.0  Narrowband antenna on-     ..............
                                                                                                                orbit demonstration.
RDSF...................................  ...........  1206616SF.................  ...........           $70.0  Cislunar space domain      ..............
                                                                                                                awareness.
PSF....................................           22  ..........................  ...........          $108.0  One additional space       ..............
                                                                                                                launch.
RDDW...................................  ...........  0603133D8Z................  ...........           $25.0  Foreign Comparative        ..............
                                                                                                                Testing.
RDDW...................................  ...........  0604250D8Z................  ...........           $46.0  Maintain SCO level of      ..............
                                                                                                                effort.
RDDW...................................  ...........  0601101E..................  ...........           $25.0  NSCAI generative AI......  ..............
RDDW...................................  ...........  0602303E..................  ...........           $50.0  NSCAI generative AI......  ..............
RDDW...................................  ...........  0601101E..................  ...........           $16.5  NSCAI AI for Cyber.......  ..............
RDDW...................................  ...........  0602303E..................  ...........           $42.9  NSCAI AI for Cyber.......  ..............
RDDW...................................  ...........  0603760E..................  ...........            $6.6  NSCAI AI for Cyber.......  ..............
OMDW...................................  ...........  ..........................          DS1          $200.0  National Defense           ..............
                                                                                                                Stockpile Transaction
                                                                                                                Fund increase.

[[Page S3645]]

 
RDDW...................................  ...........  0901579D8Z................  ...........         $(30.0)  Transfer to pilot          ..............
                                                                                                                program--Protecting
                                                                                                                Access to Critical
                                                                                                                Assets.
RDDW...................................  ...........  0901579D8Z................  ...........           $30.0  Transfer from Office of    ..............
                                                                                                                Strategic Capital for
                                                                                                                pilot program on
                                                                                                                Protecting Access to
                                                                                                                Critical Assets.
RDDW...................................  ...........  0604250D8Z................  ...........           $25.0  Pele microreactor........  ..............
RDA....................................  ...........  0603119A..................  ...........            $2.8  Contested Logistics:       ..............
                                                                                                                Autonomous Self
                                                                                                                Perception Combat
                                                                                                                Engineer Program (ASCEP).
RDDW...................................  ...........  0603896C..................  ...........           $19.0  Ballistic Missile Defense  ..............
                                                                                                                C2BMC (MD01).
4701...................................  ...........  18-D-650..................  ...........           $73.3  Tritium Finishing          ..............
                                                                                                                Facility, SRS.
4701...................................  ...........  ..........................  ...........           $28.1  B83 Stockpile Systems....  ..............
4701...................................  ...........  ..........................  ...........          $341.8  Savannah River Pit         ..............
                                                                                                                Production.
MILCON.................................  ...........  ..........................  ...........          $695.0  FY25 UFRs (for display     ..............
                                                                                                                purposes--text below).
MILCON.................................  ...........  ..........................  ...........        $1,691.0  FY24 MILCON UFRs (for      ..............
                                                                                                                display purposes--text
                                                                                                                below).
OMA....................................  ...........  ..........................          132        $1,652.0  Army FSRM to 100%........  ..............
OMN....................................  ...........  ..........................         BSM1          $650.0  Navy FSRM to 100%........  ..............
OMMC...................................  ...........  ..........................         BSM1        $1,415.0  Marine Corps FSRM to 100%  ..............
OMARNG.................................  ...........  ..........................         011R        $1,375.0  Air Force FSRM to 100%...  ..............
OMDW...................................  ...........  ..........................         4GTM           $65.0  Defense Community          ..............
                                                                                                                Infrastructure Program.
OMAF...................................  ...........  ..........................          42A            $2.0  Program increase for       ..............
                                                                                                                operational energy.
OMDW...................................        UNDIS  ..........................  ...........        $1,200.0  Fuel price increases       ..............
                                                                                                                (FY23 + Fy24).
SCN....................................           10  ..........................  ...........          $928.0  DDG-51 prior-year CTC....  ..............
SCN....................................           11  ..........................  ...........          $300.0  Surface ship supplier      ..............
                                                                                                                base.
SCN....................................           11  ..........................  ...........          $280.0  DDG-51 AP................
APN....................................           62  ..........................  ...........          $132.0  F-35B/C engine spares....  ..............
APN....................................            6  ..........................  ...........          $250.0  FD2030--CH-53K +1 a/c....  ..............
RDN....................................  ...........  0603207N..................  ...........           $10.0  Task Force 59 long-        ..............
                                                                                                                endurance USV
                                                                                                                experimentation.
RDAF...................................  ...........  0207138F..................  ...........           $35.0  F-22 open system           ..............
                                                                                                                architecture for CCA.
OPAF...................................         9999  ..........................  ...........          $200.0  Classified program.......  ..............
OPAF...................................         9999  ..........................  ...........          $150.0  Classified program.......  ..............
RDN....................................  ...........  0604378N..................  ...........           $22.5  Stratospheric balloon      ..............
                                                                                                                research--JTRS.
OPAF...................................         9999  ..........................  ...........           $40.0  Classified program.......  ..............
APN....................................           56  ..........................  ...........           $72.6  NGJ +2 additional          ..............
                                                                                                                shipsets.
OMAF...................................  ...........  ..........................     MULTIPLE          $470.3  F-22 WSS (prevent          ..............
                                                                                                                divestment).
APAF...................................           11  ..........................  ...........          $240.0  MH-139A..................  ..............
RDAF...................................  ...........  0207110F..................  ...........           $50.0  Next-Gen Advanced          ..............
                                                                                                                Propulsion.
APAF...................................            3  ..........................  ...........          $618.3  F-35A test jets (6 a/c)..  ..............
RDAF...................................  ...........  0207253F..................  ...........           $49.0  Compass Call RDTE sim....  ..............
RDAF...................................  ...........  0207133F..................  ...........           $49.1  Advanced F-16 EW           ..............
                                                                                                                protection/attack.
APAF...................................  ...........  26........................  ...........          $130.5  Advanced F-16 EW           ..............
                                                                                                                protection/attack.
OPA....................................           71  ..........................  ...........           $68.5  ENVG-B...................  ..............
OMDW...................................  ...........  ..........................         1FU1           $15.0  JTF-N....................  ..............
RDDW...................................  ...........  63375D8Z..................  ...........           $30.0  Directed Energy Threat     ..............
                                                                                                                Research.
RDDW...................................  ...........  33140D8Z..................  ...........            20.0  NSA Cyber Workforce Pilot  ..............
                                                                                                                Program.
OMARNG.................................  ...........  ..........................          153           $12.0  Army National Guard        ..............
                                                                                                                Mission Assurance
                                                                                                                Program.
RDDW...................................  ...........  9999......................  ...........           $17.0  All-domain Anomaly         ..............
                                                                                                                Resolution Office.
RDN....................................  ...........  0604558N..................  ...........            $7.0  Advanced Submarine         ..............
                                                                                                                Control Using Precision
                                                                                                                Maneuvering Unit.
OMDW...................................  ...........  ..........................         012D           $10.0  Southeast Asia Cyber       ..............
                                                                                                                Pilot Expansion.
OMARNG.................................  ...........  ..........................          121           $21.5  Exercise Northern Strike.  ..............
PMC....................................           40  ..........................  ...........           $26.0  Low cost unmanned          ..............
                                                                                                                aerospace vehicle (PAACK-
                                                                                                                P).
OPA....................................           86  ..........................  ...........           $77.0  IBCS--integration                 Army #1
                                                                                                                acceleration for
                                                                                                                INDOPACOM.
MSLS...................................            3  ..........................  ...........           $22.7  M-SHORAD Increment 1--            Army #2
                                                                                                                expand capacity of
                                                                                                                existing batteries.
OPA....................................           60  ..........................  ...........           $81.2  Trojan SPIRIT............         Army #3
OMA....................................  ...........  ..........................          121          $102.5  Expanding INDOPACOM               Army #6
                                                                                                                Campaigning Activities.
AMMO...................................           36  ..........................  ...........            21.5  Water intake pump                Army #10
                                                                                                                upgades, Radford AAP.
RDA....................................  ...........  0604804A..................  ...........           $21.2  Maneuver support vessel          Army #11
                                                                                                                (heavy).
ACFT...................................            8  ..........................  ...........           $62.1  Black Hawk (HH-60M)              Army #25
                                                                                                                replacement--MEDEVAC.
RDN....................................  ...........  0604038N..................  ...........           $45.3  Maritime Targeting Cell           Navy #1
                                                                                                                Afloat (MTC-A)
                                                                                                                Development.
RDN....................................  ...........  0604234N..................  ...........          $249.3  Fund E-2D Theater Combat          Navy #2
                                                                                                                ID and HECTR.
OPN....................................           16  ..........................  ...........           $61.9  Fund ZEUS for DDG-1000            Navy #3
                                                                                                                Class.
RDN....................................  ...........  0204202N..................  ...........          $124.5  Fund ZEUS for DDG-1000            Navy #3
                                                                                                                Class.
OMN....................................  ...........  ..........................         1C1C            $4.0  VIOLET...................         Navy #4
OPN....................................           78  ..........................  ...........            $1.2  VIOLET...................         Navy #4
RDN....................................  ...........  0101402N..................  ...........           $20.4  VIOLET...................         Navy #4
OMN....................................  ...........  ..........................         BSM1          $300.0  Dry Dock Repairs at PSNS          Navy #5
                                                                                                                Investment.
                                                                                                               Restoration and
                                                                                                                Modernization (RM).
OMN....................................  ...........  ..........................         BSM1          $250.0  Targeted Facilities               Navy #6
                                                                                                                Sustainment, Restoration
                                                                                                                and.
                                                                                                               Modernization (FSRM)
                                                                                                                Investment.
OMN....................................  ...........  ..........................         BSM1          $300.0  Targeted Facilities               Navy #6
                                                                                                                Sustainment, Restoration
                                                                                                                and.
                                                                                                               Modernization (FSRM)
                                                                                                                Investment.
SCN....................................           32  ..........................  ...........          $208.1  DDG-51 SEWIP Blk III (DDG         Navy #7
                                                                                                                136-137).
SCN....................................            3  ..........................  ...........          $170.0  CVN 75 and CVN 80 SEWIP           Navy #8
                                                                                                                Blk III.
SCN....................................            7  ..........................  ...........           $94.0  CVN 75 and CVN 80 SEWIP           Navy #8
                                                                                                                Blk III.
APN....................................           15  ..........................  ...........          $118.8  Navy Unique Fleet                 Navy #9
                                                                                                                Essential Airlift
                                                                                                                Logistics KC-130J (+1 A/
                                                                                                                C Reserve).
APN....................................           62  ..........................  ...........           $93.0  CH-53K Initial and                USMC #2
                                                                                                                Outfitting Spares.
PMC....................................           43  ..........................  ...........           $21.1  Project 7/11--Modular             USMC #3
                                                                                                                Operations Cells.
APN....................................           16  ..........................  ...........          $252.9  (+2) KC-130J Aircraft and         USMC #4
                                                                                                                Initial Spares.
PMC....................................           25  ..........................  ...........            $5.1  Distributed Common Ground/        USMC #5
                                                                                                                Surface System-.
                                                                                                               Marine Corps (DCGS-MC)
                                                                                                                All-.
                                                                                                               Source SCI Workstations..
                                                                                                               Family of Field Medical
                                                                                                                Equipment (FFME).
PMC....................................           50  ..........................  ...........           $11.0  Damage Control                    USMC #6
                                                                                                                Resuscitation.
                                                                                                               (DCR) and Damage Control
                                                                                                                Surgery (DCS).
                                                                                                               Equipment Sets...........
PMC....................................           19  ..........................  ...........          $160.0  (+4) AN/TPS-80 G/ATOR             USMC #7
                                                                                                                Radar.

[[Page S3646]]

 
RDN....................................  ...........  0206313M..................  ...........           $16.3  Satellite Communications          USMC #8
                                                                                                                Terminal, Network-on-.
                                                                                                               the-Move (NOTM)..........
                                                                                                               Digital Interoperability
                                                                                                                (DI)--Marine Agile.
RDN....................................  ...........  0605217N..................  ...........           $78.5  Network Gateway Link             USMC #11
                                                                                                                (MANGL) Roll-Up.
PMC....................................           54  ..........................  ...........           $21.0  Ultra-Light-Weight               USMC #12
                                                                                                                Camouflage Netting
                                                                                                                System (ULCANS).
PMC....................................           17  ..........................  ...........            $5.1  Joint All Domain Command         USMC #13
                                                                                                                and Control (JADC2)
                                                                                                                Testing, Evaluation and
                                                                                                                Engineering Environment.
APN....................................           68  ..........................  ...........          $122.4  (+4) F-35B Engine/Lift           USMC #14
                                                                                                                System USMC Spares.
PMC....................................           48  ..........................  ...........            $8.0  Demolition Equipment Set,        USMC #19
                                                                                                                Squad.
                                                                                                               Engineer/Explosive Hazard
                                                                                                                Defeat Systems.
APN....................................           68  ..........................  ...........           $67.5  (+3) UC-12W(ER)                  USMC #20
                                                                                                                Beechcraft King Air
                                                                                                                350ER with Cargo Door
                                                                                                                and Initial Spares.
PMC....................................           52  ..........................  ...........           $10.0  Multi-Terrain Loader--           USMC #21
                                                                                                                Replacement.
APAF...................................           52  ..........................  ...........          $596.2  Accelerate E-7 delivery..           AF #1
RDAF...................................  ...........  0604007F..................  ...........           $37.2  Accelerate E-7 delivery..           AF #1
OMAF...................................  ...........  ..........................         012C            $0.7  (OI-3) Fund ISR Digital             AF #4
                                                                                                                Infrastructure.
OMAF...................................  ...........  ..........................         012C           $58.6  (OI-3) Fund ISR Digital             AF #4
                                                                                                                Infrastructure.
RDAF...................................  ...........  0207431F..................  ...........            $1.2  (OI-3) Fund ISR Digital             AF #4
                                                                                                                Infrastructure.
RDAF...................................  ...........  0207431F..................  ...........           $13.8  (OI-3) Fund ISR Digital             AF #4
                                                                                                                Infrastructure.
RDAF...................................  ...........  0207431F..................         $6.2     (OI-3) Fund  AF #4....................
                                                                                                  ISR Digital
                                                                                               Infrastructure
RDAF...................................  ...........  0207431F..................  ...........            $5.9  (OI-3) Fund ISR Digital             AF #4
                                                                                                                Infrastructure.
RDAF...................................           66  ..........................  ...........           $15.9  (OI-3) Fund ISR Digital             AF #4
                                                                                                                Infrastructure.
OPAF...................................  ...........  0305208F..................  ...........            $5.0  (OI-3) Fund ISR Digital             AF #4
                                                                                                                Infrastructure.
RDAF...................................  ...........  ..........................  ...........           $10.6  (OI-3) Fund ISR Digital             AF #4
                                                                                                                Infrastructure.
OMAF...................................  ...........  9999......................         011C           $12.1  (OI-3) Fund ISR Digital           USSF #3
                                                                                                                Infrastructure.
RDSF...................................  ...........  9999......................  ...........           $13.0  Classified Program D.....         USSF #4
RDSF...................................  ...........  9999......................  ...........          $105.0  Classified Program E.....         USSF #5
RDSF...................................  ...........  9999......................  ...........           $90.0  Classified Program F.....         USSF #6
RDSF...................................           56  1203040SF.................  ...........           $43.0  DCO-S....................         USSF #7
RDDW...................................  ...........  0604181C..................  ...........          $298.0  Glide Phase Interceptor..          MDA #3
RDDW...................................  ...........  0603891C..................  ...........            22.9  Classified Program A/              MDA #1
                                                                                                                Novel countermeasure
                                                                                                                against hypersonic
                                                                                                                threats.
RDDW...................................  ...........  0603906C..................  ...........           $15.0  Classified Program B.....          MDA #2
RDDW...................................  ...........  0603914C..................  ...........           $34.7  Pacific Collector/Pacific          MDA #7
                                                                                                                Tracker Replacement.
                                                                                                               Planning & Engineering...
RDDW...................................  ...........  0603914C..................  ...........          $315.3  Pacific Collector                  MDA #8
                                                                                                                Replacement.
RDDW...................................  ...........  0603891C..................  ...........           $32.2  Left Through Right of              MDA #4
                                                                                                                Launch Integration/
                                                                                                                Antenna, software
                                                                                                                development & C2BMC
                                                                                                                integration.
RDDW...................................  ...........  0603890C..................  ...........           $12.4  Electronic Attack/                 MDA #6
                                                                                                                Electronic Protection.
RDDW...................................  ...........  0603891C..................  ...........           $27.3  Electronic Warfare for             MDA #9
                                                                                                                Missile Defense.
OPN....................................          126  ..........................  ...........           $36.9  Somalia presistent             AFRICOM #1
                                                                                                                presence.
OMA....................................  ...........  ..........................          411           $95.3  Contract ISR.............      AFRICOM #2
OMA....................................  ...........  ..........................          411            $2.1  Contract ISR.............      AFRICOM #2
OMA....................................  ...........  ..........................          411            $4.7  Contract ISR.............      AFRICOM #2
RDA....................................  ...........  0603766A..................  ...........           $14.7  Air Vigilance O&S........      CENTCOM #1
RDAF...................................  ...........  0207247F..................  ...........           $15.0  AF TENCAP Crestone             CENTCOM #1
                                                                                                                Database.
OMAF...................................  ...........  ..........................         015F           $16.0  GPN-CENT.................      CENTCOM #2
OMAF...................................  ...........  ..........................         015F            $8.0  Data analysis and AI           CENTCOM #3
                                                                                                                initiative.
OMAF...................................  ...........  ..........................         015F           $34.0  MSS licenses.............      CENTCOM #3
OMAF...................................  ...........  ..........................         015F           $30.0  Cloud transition.........      CENTCOM #3
                                         ...........  0303055F..................         011Z           $81.2  European Communications          EUCOM #1
                                                                                                                Infrastructure.
                                         ...........  0207522F..................         012C           $78.3  Air Based Air Defense....        EUCOM #2
RDDW...................................  ...........  0604331D8Z................  ...........          $174.0  Joint Fires Network (JFN)    INDOPACOM #1
RDDW...................................  ...........  0604102C..................  ...........          $147.0  Guam Defense System......    INDOPACOM #2
OMAF...................................  ...........  ..........................         011C           $90.0  INDOPACOM Campaigning....    INDOPACOM #5
OMMC...................................  ...........  ..........................         1A1A            $8.0  INDOPACOM Campaigning....    INDOPACOM #5
OMN....................................  ...........  ..........................         1CCM           $36.0  INDOPACOM Campaigning....    INDOPACOM #5
OMN....................................  ...........  ..........................         1CCM           $49.0  Joint Training Team......    INDOPACOM #9
OMN....................................  ...........  ..........................         1CCM           $25.5  Joint Task Force            INDOPACOM #10
                                                                                                                Micronesia.
RDDW...................................  ...........  0604331D8Z................  ...........           $10.0  Joint Experimentation and   INDOPACOM #12
                                                                                                                Innovation.
OMN....................................  ...........  ..........................         1CCM            $9.0  Joint Experimentation and   INDOPACOM #12
                                                                                                                Innovation.
OPN....................................           43  ..........................  ...........          $117.0  Persistent Targeting for    INDOPACOM #17
                                                                                                                Undersea.
OMN....................................  ...........  ..........................         1CCM            $9.0  Joint Task Force Indo-      INDOPACOM #24
                                                                                                                Pacific (JTF-IP).
OMN....................................  ...........  ..........................         1CCM            $5.0  Headquarters Manpower       INDOPACOM #26
                                                                                                                Enhancements.
OMDW...................................  ...........  ..........................         8PLI           $69.9  Joint Training, Exercise    INDOPACOM #27
                                                                                                                and Evaluation Program.
                                                                                                               (JTEEP)..................
RDAF...................................  ...........  0604617F..................  ...........            $4.5  Arctic capable prepo          NORTHCOM #1
                                                                                                                shelters.
RDAF...................................  ...........  0604617F..................  ...........            $5.5  Arctic capable prepo          NORTHCOM #1
                                                                                                                shelters.
OMAF...................................  ...........  ..........................         015C            $5.2  Counter strategic             NORTHCOM #2
                                                                                                                competitors in Western
                                                                                                                Hemisphere.
RDAF...................................  ...........  0604617F..................  ...........            $1.0  Arctic campaigning.......     NORTHCOM #3
RDAF...................................  ...........  0604617F..................  ...........            $6.0  Arctic campaigning.......     NORTHCOM #3

[[Page S3647]]

 
RDAF...................................  ...........  0102417F..................  ...........           $55.0  OTH-R capability              NORTHCOM #4
                                                                                                                acceleration.
RDAF...................................  ...........  0102326F..................  ...........            $9.8  Domain awareness tech dev     NORTHCOM #5
RDAF...................................  ...........  01002412F.................  ...........           $27.0  ARCHER...................     NORTHCOM #6
OPAF...................................           22  ..........................  ...........          $211.5  3DELLR...................     NORTHCOM #7
RDAF...................................  ...........  0102326F..................  ...........            $4.2  HDCS.....................     NORTHCOM #8
RDAF...................................  ...........  0102326F..................  ...........           $33.2  ERSA.....................     NORTHCOM #9
RDAF...................................  ...........  0201130F..................  ...........           $13.9  Core tech investment.....    NORTHCOM #10
O&M, DW................................  ...........  ..........................         1PL7           $31.1  Counter Uncrewed Aerial             SOCOM
                                                                                                                Systems (CUAS) Group.
                                                                                                               3 Defeat Acceleration....
PROC, DW...............................           75  ..........................  ...........            $9.3  Counter Uncrewed Aerial             SOCOM
                                                                                                                Systems (CUAS) Group.
                                                                                                               3 Defeat Acceleration....
OMMC...................................  ...........  ..........................         1A1A            $9.9  Global Prepositioning        SOUTHCOM #22
                                                                                                                Network (GPN) Concept.
RDSF...................................  ...........  9999......................  ...........          $143.0  SPACECOM classified           SPACECOM #3
                                                                                                                program.
RDSF...................................  ...........  9999......................  ...........          $127.0  SPACECOM classified           SPACECOM #5
                                                                                                                program.
RDSF...................................  ...........  9999......................  ...........           $68.0  SPACECOM classified           SPACECOM #6
                                                                                                                program.
OMAF...................................  ...........  ..........................         015X           $20.0  Space warfighting terrain     SPACECOM #7
                                                                                                   $ 24,969.4
                                                                                              ----------------
--------------------------------------------------------------------------------------------------------------------------------------------------------


--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                     FY 2024       Senate       Senate
               Account                       State/Country             Installation            Project Title         Request       Change     Authorized
--------------------------------------------------------------------------------------------------------------------------------------------------------
MILITARY CONSTRUCTION
ARMY
  Army...............................  Alabama.................  Anniston Army Depot....  OPEN STORAGE (P&D).....            0          270          270
  Army...............................  Alabama.................  Redstone Arsenal.......  SUBSTATION.............       50,000            0       50,000
  Army...............................  Alaska..................  Fort Wainwright........  COST TO COMPLETE:             34,000            0       34,000
                                                                                           ENLISTED UNACCOMPANIED
                                                                                           PERS HSG.
  Army...............................  Alaska..................  Fort Wainwright........  SOLDER PERFORMANCE                 0        7,900        7,900
                                                                                           READINESS CENTER (P&D).
  Army...............................  Florida.................  Eglin Air Force Base...  BARRACKS...............            0       75,000       75,000
  Army...............................  Georgia.................  Hunter Army Airfield...  AIRCRAFT MAINTENANCE               0        9,900        9,900
                                                                                           HANGAR (P&D).
  Army...............................  Georgia.................  Fort Eisenhower........  CYBER INSTRUCTIONAL          163,000      -90,000       73,000
                                                                                           FACILITY (CLASSROOMS).
  Army...............................  Germany.................  Grafenwoehr............  AUTOMATED MULTIPURPOSE        10,400            0       10,400
                                                                                           MACHINE GUN RANGE.
  Army...............................  Germany.................  Hohenfels..............  SIMULATIONS CENTER.....       56,000            0       56,000
  Army...............................  Germany.................  Pulaski Barracks.......  CHILD DEVELOPMENT                  0       25,000       25,000
                                                                                           CENTER.
  Army...............................  Hawaii..................  Aliamanu Military        WATER STORAGE TANK.....       20,000            0       20,000
                                                                  Reservation.
  Army...............................  Hawaii..................  Fort Shafter...........  CLEARWELL AND BOOSTER              0       23,000       23,000
                                                                                           PUMP.
  Army...............................  Hawaii..................  Helemano Military        WELLS AND STORAGE TANK.            0       33,000       33,000
                                                                  Reservation.
  Army...............................  Hawaii..................  Schofield Barracks.....  ELEVATED TANK AND                  0       21,000       21,000
                                                                                           DISTRIBUTION LINE.
  Army...............................  Hawaii..................  Schofield Barracks.....  WATER STORAGE TANK.....            0       16,000       16,000
  Army...............................  Hawaii..................  Wheeler Army Airfield..  AIR TRAFFIC CONTROL                0        5,400        5,400
                                                                                           TOWER (P&D).
  Army...............................  Indiana.................  Crane Army Ammunition    EARTH COVERED MAGAZINES            0        1,195        1,195
                                                                  Plant.                   (P&D).
  Army...............................  Illinois................  Rock Island Arsenal....  CHILD DEVELOPMENT                  0       44,000       44,000
                                                                                           CENTER ADDITION.
  Army...............................  Kansas..................  Fort Riley.............  AIR TRAFFIC CONTROL                0        1,600        1,600
                                                                                           TOWER (P&D).
  Army...............................  Kansas..................  Fort Riley.............  AIRCRAFT MAINTENANCE         105,000            0      105,000
                                                                                           HANGER.
  Army...............................  Kentucky................  Blue Grass Army Depot..  SMALL ARMS                         0        3,300        3,300
                                                                                           MODERNIZATION (P&D).
  Army...............................  Kentucky................  Fort Campbell..........  AIR TRAFFIC CONTROL                0        2,500        2,500
                                                                                           TOWER (P&D).
  Army...............................  Kentucky................  Fort Campbell..........  MULTIPURPOSE TRAINING         38,000            0       38,000
                                                                                           RANGE.
  Army...............................  Kentucky................  Fort Knox..............  MIDDLE SCHOOL ADDITION             0        6,600        6,600
                                                                                           (P&D).
  Army...............................  Kwajalein...............  Kwajalein Atoll........  COST TO COMPLETE: PIER.            0       15,000       15,000
  Army...............................  Louisiana...............  Fort Johnson...........  BARRACKS...............            0      106,000      106,000
  Army...............................  Louisiana...............  Fort Johnson...........  MULTIPURPOSE ATHLETIC              0       13,400       13,400
                                                                                           FIELD.
  Army...............................  Maryland................  Fort Meade.............  CHILD DEVELOPMENT                  0       50,000       50,000
                                                                                           CENTER.
  Army...............................  Massachusetts...........  Soldier Systems Center   BARRACKS ADDITION......       18,500            0       18,500
                                                                  Natick.
  Army...............................  Michigan................  Detroit Arsenal........  GROUND TRANSPORT              72,000            0       72,000
                                                                                           EQUIPMENT BUILDING.
  Army...............................  New Mexico..............  White Sands Missile      J-DETC DIRECTED ENERGY             0        5,500        5,500
                                                                  Range.                   FACILITY (P&D).
  Army...............................  New York................  Fort Hamilton..........  CHILD DEVELOPMENT                  0       25,000       25,000
                                                                                           CENTER.
  Army...............................  New York................  Watervliet Arsenal.....  TANK FARM (P&D)........            0          160          160
  Army...............................  North Carolina..........  Fort Liberty...........  AUTOMATED RECORD FIRE         19,500            0       19,500
                                                                                           RANGE.
  Army...............................  North Carolina..........  Fort Liberty...........  BARRACKS...............       50,000            0       50,000
  Army...............................  North Carolina..........  Fort Liberty...........  BARRACKS (FACILITY            85,000            0       85,000
                                                                                           PROTOTYPING).
  Army...............................  North Carolina..........  Fort Liberty...........  CHILD DEVELOPMENT                  0       39,000       39,000
                                                                                           CENTER.
  Army...............................  Oklahoma................  McAlester Army           WATER TREATMENT PLANT              0        1,194        1,194
                                                                  Ammunition Plant.        (P&D).
  Army...............................  Pennsylvania............  Letterkenny Army Depot.  ANECHOIC CHAMBER (P&D).            0          275          275
  Army...............................  Pennsylvania............  Letterkenny Army Depot.  GUIDED MISSILE                89,000            0       89,000
                                                                                           MAINTENANCE BUILDING.
  Army...............................  Pennsylvania............  Tobyhanna Army Depot...  HELIPAD (P&D)..........            0          311          311
  Army...............................  Pennsylvania............  Tobyhanna Army Depot...  RADAR MAINTENANCE SHOP             0          259          259
                                                                                           (P&D).
  Army...............................  Poland..................  Various Locations......  PLANNING & DESIGN......            0       25,710       25,710
  Army...............................  South Carolina..........  Fort Jackson...........  CHILD DEVELOPMENT                  0       41,000       41,000
                                                                                           CENTER.
  Army...............................  South Carolina..........  Fort Jackson...........  COST TO COMPLETE:                  0       66,000       66,000
                                                                                           RECEPTION BARRACKS
                                                                                           COMPLEX, PHASE 2.
  Army...............................  Texas...................  Fort Bliss.............  RAIL YARD..............       74,000            0       74,000
  Army...............................  Texas...................  Fort Cavazos...........  BARRACKS (P&D).........            0       20,000       20,000
  Army...............................  Texas...................  Fort Cavazos...........  TACTICAL EQUIPMENT                 0        5,800        5,800
                                                                                           MAINTENANCE FACILITIES
                                                                                           (P&D).
  Army...............................  Texas...................  Red River Army Depot...  COMPONENT REBUILD SHOP.      113,000      -66,600       46,400
  Army...............................  Texas...................  Red River Army Depot...  NON-DESTRUCTIVE TESTING            0          280          280
                                                                                           FACILITY (P&D).
  Army...............................  Texas...................  Red River Army Depot...  STANDBY GENERATOR (P&D)            0          270          270
  Army...............................  Virginia................  Fort Belvoir...........  EQUINE TRAINING                    0        4,000        4,000
                                                                                           FACILITY (P&D).
  Army...............................  Virginia................  Fort Belvoir...........  EQUINE FACILITY........            0       40,000       40,000
  Army...............................  Virginia................  Joint Base Myer-         BARRACKS...............            0      177,000      177,000
                                                                  Henderson Hall.
  Army...............................  Washington..............  Joint Base Lewis-        BARRACKS...............      100,000            0      100,000
                                                                  McChord.
  Army...............................  Washington..............  Joint Base Lewis-        VEHICLE MAINTENANCE                0        7,500        7,500
                                                                  McChord.                 SHOP (P&D).
  Army...............................  Worldwide Unspecified...  Unspecified Worldwide..  BARRACKS REPLACEMENT               0       50,000       50,000
                                                                                           FUND.
  Army...............................  Worldwide Unspecified...  Unspecified Worldwide    HOST NATION SUPPORT....       26,000            0       26,000
                                                                  Locations.
  Army...............................  Worldwide Unspecified...  Unspecified Worldwide    MINOR CONSTRUCTION.....       76,280            0       76,280
                                                                  Locations.
  Army...............................  Worldwide Unspecified...  Unspecified Worldwide    PLANNING & DESIGN......      270,875            0      270,875
                                                                  Locations.
                                                                                            Subtotal Military        1,470,555      812,724    2,283,279
                                                                                           Construction, Army.
                                                                                         --------------------------
NAVY
  Navy...............................  Australia...............  Royal Australian Air     PDI: AIRCRAFT PARKING        134,624            0      134,624
                                                                  Force Base Darwin.       APRON (INC).
  Navy...............................  California..............  Marine Corps Air Ground  COMMUNICATIONS TOWERS..       42,100            0       42,100
                                                                  Combat Center
                                                                  Twentynine Palms.
  Navy...............................  California..............  Marine Corps Base Camp   FIRE/EMERGENCY RESPONSE            0       26,825       26,825
                                                                  Pendleton.               STATION (53 AREA)
                                                                                           REPLACEMENT.
  Navy...............................  California..............  Port Hueneme...........  LABORATORY COMPOUND          110,000      -95,000       15,000
                                                                                           FACILITIES
                                                                                           IMPROVEMENTS.
  Navy...............................  Connecticut.............  Naval Submarine Base     SUBMARINE PIER 31            112,518      -75,800       36,718
                                                                  New London.              EXTENSION.
  Navy...............................  Connecticut.............  Naval Submarine Base     WEAPONS MAGAZINE &           219,200     -200,000       19,200
                                                                  New London.              ORDNANCE OPERATIONS
                                                                                           FAC..
  Navy...............................  District Of Columbia....  Marine Barracks          BACHELOR ENLISTED            131,800     -115,000       16,800
                                                                  Washington.              QUARTERS & SUPPORT
                                                                                           FACILITY.
  Navy...............................  District of Columbia....  Naval Support Activity.  ELECTROMAGNETIC & CYBER            0       40,000       40,000
                                                                                           COUNTERMEASURES LAB
                                                                                           (P&D).
  Navy...............................  Djibouti................  Camp Lemonnier.........  ELECTRICAL POWER PLANT.            0       20,000       20,000
  Navy...............................  Florida.................  Naval Air Station        AHTS HANGAR............            0       50,000       50,000
                                                                  Whiting Field.
  Navy...............................  Georgia.................  Marine Corps Logistics   CONSOLIDATED                       0       63,970       63,970
                                                                  Base Albany.             COMMUNICATION FACILITY.
  Navy...............................  Guam....................  Andersen Air Force Base  PDI: CHILD DEVELOPMENT       105,220      -50,000       55,220
                                                                                           CENTER.
  Navy...............................  Guam....................  Andersen Air Force Base  PDI: JOINT CONSOL.           107,000            0      107,000
                                                                                           COMM. CENTER (INC).
  Navy...............................  Guam....................  Joint Region Marianas..  PDI: JOINT                   292,830     -261,500       31,330
                                                                                           COMMUNICATION UPGRADE
                                                                                           (INC).

[[Page S3648]]

 
 
  Navy...............................  Guam....................  Joint Region Marianas..  PDI: MISSILE                 174,540     -130,000       44,540
                                                                                           INTEGRATION TEST
                                                                                           FACILITY.
  Navy...............................  Guam....................  Naval Base Guam........  PDI: 9TH ESB TRAINING         23,380            0       23,380
                                                                                           COMPLEX.
  Navy...............................  Guam....................  Naval Base Guam........  PDI: ARTILLERY BATTERY       137,550      -70,000       67,550
                                                                                           FACILITIES.
  Navy...............................  Guam....................  Naval Base Guam........  PDI: CONSOLIDATED MEB         19,740            0       19,740
                                                                                           HQ/NCIS PHII.
  Navy...............................  Guam....................  Naval Base Guam........  PDI: RECREATION CENTER.       34,740            0       34,740
  Navy...............................  Guam....................  Naval Base Guam........  PDI: RELIGIOUS MINISTRY       46,350            0       46,350
                                                                                           SERVICES FACILITY.
  Navy...............................  Guam....................  Naval Base Guam........  PDI: SATELLITE               166,159     -110,000       56,159
                                                                                           COMMUNICATIONS
                                                                                           FACILITY (INC).
  Navy...............................  Guam....................  Naval Base Guam........  PDI: TRAINING CENTER...       89,640            0       89,640
  Navy...............................  Hawaii..................  Joint Base Pearl Harbor- DRY DOCK 3 REPLACEMENT     1,318,711       91,000    1,409,711
                                                                  Hickam.                  (INC).
  Navy...............................  Hawaii..................  Joint Base Pearl Harbor- WATERFRONT PRODUCTION              0       60,000       60,000
                                                                  Hickam.                  FACILITY (P&D).
  Navy...............................  Hawaii..................  Marine Corps Base        WATER RECLAMATION                  0       40,000       40,000
                                                                  Kaneohe Bay.             FACILITY COMPLIANCE
                                                                                           UPGRADE.
  Navy...............................  Italy...................  Naval Air Station        EDI: ORDNANCE MAGAZINES       77,072            0       77,072
                                                                  Sigonella.
  Navy...............................  Maine...................  Portsmouth Naval         MULTI-MISSION DRYDOCK        544,808            0      544,808
                                                                  Shipyard.                #1 EXTENSION (INC).
  Navy...............................  Maryland................  Fort Meade.............  CYBERSECURITY                186,480     -125,900       60,580
                                                                                           OPERATIONS FACILITY.
  Navy...............................  Maryland................  Naval Air Station        AIRCRAFT DEVELOPMENT         141,700      -79,700       62,000
                                                                  Patuxent River.          AND MAINTENANCE
                                                                                           FACILITIES.
  Navy...............................  North Carolina..........  Marine Corps Air         2D LAAD MAINTENANCE AND            0       50,000       50,000
                                                                  Station Cherry Point.    OPERATIONS FACILITIES.
  Navy...............................  North Carolina..........  Marine Corps Air         AIRCRAFT MAINTENANCE          19,529            0       19,529
                                                                  Station Cherry Point.    HANGAR (INC).
  Navy...............................  North Carolina..........  Marine Corps Air         MAINTENANCE FACILITY &       125,150      -85,000       40,150
                                                                  Station Cherry Point.    MARINE AIR GROUP HQS.
  Navy...............................  North Carolina..........  Marine Corps Base Camp   10TH MARINES                       0       20,000       20,000
                                                                  Lejeune.                 MAINTENANCE &
                                                                                           OPERATIONS COMPLEX.
  Navy...............................  North Carolina..........  Marine Corps Base Camp   AMPHIBIOUS COMBAT                  0       31,890       31,890
                                                                  Lejeune.                 VEHICLE SHELTERS.
  Navy...............................  North Carolina..........  Marine Corps Base Camp   CORROSION REPAIR                   0       20,000       20,000
                                                                  Lejeune.                 FACILITY REPLACEMENT.
  Navy...............................  Pennsylvania............  Naval Surface Warfare    AI MACHINERY CONTROL               0       88,200       88,200
                                                                  Center Philadelphia      DEVELOPMENT CENTER.
                                                                  Dam Neck Annex.
  Navy...............................  Virginia................  .......................  MARITIME SURVEILLANCE        109,680            0      109,680
                                                                                           SYSTEM FACILITY.
  Navy...............................  Virginia................  Joint Expeditionary      CHILD DEVELOPMENT             35,000            0       35,000
                                                                  Base Little Creek--      CENTER.
                                                                  Fort Story.
  Navy...............................  Virginia................  Marine Corps Base        WATER TREATMENT PLANT..      127,120      -90,000       37,120
                                                                  Quantico.
  Navy...............................  Virginia................  Naval Station Norfolk..  CHILD DEVELOPMENT             43,600            0       43,600
                                                                                           CENTER.
  Navy...............................  Virginia................  Naval Station Norfolk..  MQ-25 AIRCRAFT LAYDOWN       114,495     -103,000       11,495
                                                                                           FACILITIES.
  Navy...............................  Virginia................  Naval Station Norfolk..  SUBMARINE PIER 3 (INC).       99,077            0       99,077
  Navy...............................  Virginia................  Naval Weapons Station    WEAPONS MAGAZINES......      221,920     -175,000       46,920
                                                                  Yorktown.
  Navy...............................  Virginia................  Norfolk Naval Shipyard.  DRY DOCK SALTWATER            81,082            0       81,082
                                                                                           SYSTEM FOR CVN-78
                                                                                           (INC).
  Navy...............................  Washington..............  Naval Base Kitsap......  ALTERNATE POWER                    0       19,000       19,000
                                                                                           TRANSMISSION LINE.
  Navy...............................  Washington..............  Naval Base Kitsap......  ARMORED FIGHTING                   0       31,000       31,000
                                                                                           VEHICLE SUPPORT
                                                                                           FACILITY.
  Navy...............................  Washington..............  Naval Base Kitsap......  SHIPYARD ELECTRICAL          195,000     -180,000       15,000
                                                                                           BACKBONE.
  Navy...............................  Worldwide Unspecified...  Unspecified Worldwide..  BARRACKS REPLACEMENT               0       75,000       75,000
                                                                                           FUND.
  Navy...............................  Worldwide Unspecified...  Unspecified Worldwide..  INDOPACOM PLANNING &               0       69,000       69,000
                                                                                           DESIGN.
  Navy...............................  Worldwide Unspecified...  Unspecified Worldwide..  MCON-D (UTILITIES                  0       85,000       85,000
                                                                                           MILCON) (P&D).
  Navy...............................  Worldwide Unspecified...  Unspecified Worldwide..  SIOP (P&D).............            0       50,000       50,000
  Navy...............................  Worldwide Unspecified...  Unspecified Worldwide..  PLANNING & DESIGN......      599,942            0      599,942
  Navy...............................  Worldwide Unspecified...  Unspecified Worldwide..  UNSPECIFIED MINOR             34,430       30,000       64,430
                                                                                           CONSTRUCTION.
  Navy...............................  Worldwide Unspecified...  Unspecified Worldwide..  USMC PLANNING & DESIGN.            0       48,741       48,741
                                       ........................  .......................  Subtotal Military          6,022,187     -936,274    5,085,913
                                                                                           Construction, Navy.
  AIR FORCE..........................  ........................  .......................  .......................  ...........  ...........  ...........
  Air Force..........................  Alaska..................  Eielson Air Force Base.  CONSOLIDATED MUNITIONS             0        1,200        1,200
                                                                                           COMPLEX (P&D).
  Air Force..........................  Alaska..................  Eielson Air Force Base.  JOINT PACIFIC ALASKA               0        1,100        1,100
                                                                                           RANGE COMPLEX (JPARC)
                                                                                           OPS FACILITY (P&D).
  Air Force..........................  Alaska..................  Joint Base Elmendorf-    EXTEND RUNWAY 16/34          107,500            0      107,500
                                                                  Richardson.              (INC 3).
  Air Force..........................  Alaska..................  Joint Base Elmendorf-    PRECISION GUIDED                   0        6,100        6,100
                                                                  Richardson.              MISSILE COMPLEX (P&D).
  Air Force..........................  Arizona.................  Luke Air Force Base....  GILA BEND (P&D)........            0        2,600        2,600
  Air Force..........................  Australia...............  Royal Australian Air     PDI: SQUADRON                 26,000            0       26,000
                                                                  Force Base Darwin.       OPERATIONS FACILITY.
  Air Force..........................  Australia...............  Royal Australian Air     PDI: AIRCRAFT                 17,500            0       17,500
                                                                  Force Base Tindal.       MAINTENANCE SUPPORT
                                                                                           FACILITY.
  Air Force..........................  Australia...............  Royal Australian Air     PDI: SQUADRON                 20,000            0       20,000
                                                                  Force Base Tindal.       OPERATIONS FACILITY.
  Air Force..........................  Australia...............  Royal Australian Air     PDI: BOMBER APRON......       93,000            0       93,000
                                                                  Force Base Tindal.
  Air Force..........................  District of Columbia....  Joint Base Anacostia-    LARGE VEHICLE                      0       50,000       50,000
                                                                  Bolling.                 INSPECTION STATION.
  Air Force..........................  Florida.................  MacDill Air Force Base.  KC-46A ADAL AIRCRAFT          25,000            0       25,000
                                                                                           CORROSION CONTROL.
  Air Force..........................  Florida.................  MacDill Air Force Base.  KC-46A ADAL AIRCRAFT          27,000            0       27,000
                                                                                           MAINTENANCE HANGAR.
  Air Force..........................  Florida.................  MacDill Air Force Base.  KC-46A ADAL APRON &           61,000            0       61,000
                                                                                           HYDRANT FUELING PITS.
  Air Force..........................  Florida.................  MacDill Air Force Base.  KC-46A ADAL FUEL SYSTEM       18,000            0       18,000
                                                                                           MAINTENANCE DOCK.
  Air Force..........................  Florida.................  Patrick Space Force      COMMERCIAL VEHICLE            15,000            0       15,000
                                                                  Base.                    INSPECTION.
  Air Force..........................  Florida.................  Patrick Space Force      COST TO COMPLETE:             15,000            0       15,000
                                                                  Base.                    CONSOLIDATED
                                                                                           COMMUNICATIONS CENTER.
  Air Force..........................  Florida.................  Patrick Space Force      FINAL DENIAL BARRIERS,        12,000            0       12,000
                                                                  Base.                    SOUTH GATE.
  Air Force..........................  Florida.................  Tyndall Air Force Base.  NATURAL DISASTER                   0      252,000      252,000
                                                                                           RECOVERY.
  Air Force..........................  Georgia.................  Robins Air Force Base..  BATTLE MANAGEMENT            115,000            0      115,000
                                                                                           COMBINED OPERATIONS
                                                                                           COMPLEX.
  Air Force..........................  Guam....................  Joint Region Marianas..  PDI: NORTH AIRCRAFT          109,000            0      109,000
                                                                                           PARKING RAMP (INC).
  Air Force..........................  Japan...................  Kadena Air Base........  PDI: HELO RESCUE OPS          46,000            0       46,000
                                                                                           MAINTENANCE HANGAR
                                                                                           (INC 3).
  Air Force..........................  Japan...................  Kadena Air Base........  PDI: THEATER A/C              42,000            0       42,000
                                                                                           CORROSION CONTROL CTR
                                                                                           (INC).
  Air Force..........................  Louisiana...............  Barksdale Air Force      CHILD DEVELOPMENT                  0        2,000        2,000
                                                                  Base.                    CENTER (P&D).
  Air Force..........................  Louisiana...............  Barksdale Air Force      DORMITORY (P&D)........            0        7,000        7,000
                                                                  Base.
  Air Force..........................  Louisiana...............  Barksdale Air Force      WEAPONS GENERATION           112,000            0      112,000
                                                                  Base.                    FACILITY (INC 3).
  Air Force..........................  Mariana Islands.........  Tinian.................  PDI: AIRFIELD                 26,000            0       26,000
                                                                                           DEVELOPMENT, PHASE 1
                                                                                           (INC 3).
  Air Force..........................  Mariana Islands.........  Tinian.................  PDI: FUEL TANKS W/            20,000            0       20,000
                                                                                           PIPELINE & HYDRANT
                                                                                           (INC 3).
  Air Force..........................  Mariana Islands.........  Tinian.................  PDI: PARKING APRON (INC       32,000            0       32,000
                                                                                           3).
  Air Force..........................  Massachusetts...........  Hanscom Air Force Base.  CHILD DEVELOPMENT             37,000            0       37,000
                                                                                           CENTER.
  Air Force..........................  Massachusetts...........  Hanscom Air Force Base.  MIT-LINCOLN LAB (WEST         70,000            0       70,000
                                                                                           LAB CSL/MIF) (INC 4).
  Air Force..........................  Mississippi.............  Columbus Air Force Base  T-7A GROUND BASED             30,000            0       30,000
                                                                                           TRAINING SYSTEM
                                                                                           FACILITY.
  Air Force..........................  Mississippi.............  Columbus Air Force Base  T-7A UNIT MAINTENANCE          9,500            0        9,500
                                                                                           TRAINING FACILITY.
  Air Force..........................  Mississippi.............  Keesler Air Force Base.  AIR TRAFFIC CONTROL                0        2,000        2,000
                                                                                           TOWER (P&D).
  Air Force..........................  Montana.................  Malmstrom Air Force      FIRE STATION BAY/                  0       10,300       10,300
                                                                  Base.                    STORAGE AREA.
  Air Force..........................  Nebraska................  Offutt Air Force Base..  55 CES MAINTENANCE/                0        4,500        4,500
                                                                                           WAREHOUSE (P&D).
  Air Force..........................  Nebraska................  Offutt Air Force Base..  BASE OPERATIONS/                   0        5,000        5,000
                                                                                           MOBILITY CENTER (P&D).
  Air Force..........................  Nebraska................  Offutt Air Force Base..  LOGISTICS READINESS                0        3,500        3,500
                                                                                           SQUADRON
                                                                                           TRANSPORTATION
                                                                                           FACILITY (P&D).
  Air Force..........................  Nevada..................  Nellis Air Force Base..  F-35 COALITION HANGAR              0        5,500        5,500
                                                                                           (P&D).
  Air Force..........................  Nevada..................  Nellis Air Force Base..  F-35 DATA LAB SUPPORT              0          700          700
                                                                                           FACILITY (P&D).
  Air Force..........................  New Mexico..............  Cannon Air Force Base..  SATELLITE FIRE STATION             0        5,000        5,000
                                                                                           (P&D).
  Air Force..........................  New Mexico..............  Kirtland Air Force Base  COST TO COMPLETE:                  0       24,400       24,400
                                                                                           WYOMING GATE UPGRADE
                                                                                           FOR ANTITERRORISM
                                                                                           COMPLIANCE.
  Air Force..........................  Norway..................  Rygge Air Station......  EDI: DABS-FEV STORAGE..       88,000            0       88,000
  Air Force..........................  Norway..................  Rygge Air Station......  EDI: MUNITIONS STORAGE        31,000            0       31,000
                                                                                           AREA.
  Air Force..........................  Ohio....................  Wright-Patterson Air     ACQUISITION MANAGEMENT             0       19,500       19,500
                                                                  Force Base.              COMPLEX PHASE V (P&D).
  Air Force..........................  Oklahoma................  Tinker Air Force Base..  KC-46 3-BAY DEPOT             78,000            0       78,000
                                                                                           MAINTENANCE HANGAR
                                                                                           (INC 3).
  Air Force..........................  Oklahoma................  Vance Air Force Base...  CONSOLIDATED                       0        8,400        8,400
                                                                                           UNDERGRADUATE PILOT
                                                                                           TRAINING CENTER (P&D).
  Air Force..........................  Philippines.............  Cesar Basa Air Base....  PDI: TRANSIENT AIRCRAFT       35,000            0       35,000
                                                                                           PARKING APRON.
  Air Force..........................  South Dakota............  Ellsworth Air Force      B-21 FUEL SYSTEM              75,000            0       75,000
                                                                  Base.                    MAINTENANCE DOCK.
  Air Force..........................  South Dakota............  Ellsworth Air Force      B-21 PHASE HANGAR......      160,000            0      160,000
                                                                  Base.
  Air Force..........................  South Dakota............  Ellsworth Air Force      B-21 WEAPONS GENERATION      160,000            0      160,000
                                                                  Base.                    FACILITY (INC).
  Air Force..........................  Spain...................  Moron Air Base.........  EDI: MUNITIONS STORAGE.       26,000            0       26,000
  Air Force..........................  Texas...................  Joint Base San Antonio-  91 CYBER OPERATIONS                0       48,000       48,000
                                                                  Lackland.                CENTER.
  Air Force..........................  Texas...................  Joint Base San Antonio-  BMT--CHAPEL FOR                    0      122,000      122,000
                                                                  Lackland.                AMERICA'S AIRMEN.
  Air Force..........................  Texas...................  Joint Base San Antonio-  BMT--CLASSROOM/DINING              0      124,000      124,000
                                                                  Lackland.                FACILITY 4.
  Air Force..........................  Texas...................  Joint Base San Antonio-  CHILD DEVELOPMENT             20,000            0       20,000
                                                                  Lackland.                CENTER.
  Air Force..........................  United Kingdom..........  Royal Air Force          COST TO COMPLETE: EDI              0       28,000       28,000
                                                                  Fairford.                DABS-FEV STORAGE.
  Air Force..........................  United Kingdom..........  Royal Air Force          COST TO COMPLETE: EDI              0       20,000       20,000
                                                                  Fairford.                MUNITIONS HOLDING AREA.
  Air Force..........................  United Kingdom..........  Royal Air Force          EDI: RADR STORAGE             47,000            0       47,000
                                                                  Fairford.                FACILITY.
  Air Force..........................  United Kingdom..........  Royal Air Force          EDI: RADR STORAGE             28,000            0       28,000
                                                                  Lakenheath.              FACILITY.
  Air Force..........................  United Kingdom..........  Royal Air Force          SURETY DORMITORY.......       50,000            0       50,000
                                                                  Lakenheath.

[[Page S3649]]

 
  Air Force..........................  Utah....................  Hill Air Force Base....  F-35 COMPOSITE REPAIR &            0      171,000      171,000
                                                                                           TRAINING FACILITY,
                                                                                           PHASE 1.
  Air Force..........................  Utah....................  Hill Air Force Base....  F-35 MAINTENANCE                   0      235,000      235,000
                                                                                           FACILITY, PHASE 1.
  Air Force..........................  Utah....................  Hill Air Force Base....  F-35 T-7A EAST CAMPUS         82,000            0       82,000
                                                                                           INFRASTRUCTURE.
  Air Force..........................  Virginia................  Langley Air Force Base.  COST TO COMPLETE--                 0       84,000       84,000
                                                                                           DORMITORY.
  Air Force..........................  Worldwide Unspecified...  Unspecified Worldwide..  BARRACKS REPLACEMENT               0       50,000       50,000
                                                                                           FUND.
  Air Force..........................  Worldwide Unspecified...  Unspecified Worldwide    EDI: PLANNING & DESIGN.        5,648            0        5,648
                                                                  Locations.
  Air Force..........................  Worldwide Unspecified...  Unspecified Worldwide    PLANNING & DESIGN......      429,266            0      429,266
                                                                  Locations.
  Air Force..........................  Worldwide Unspecified...  Unspecified Worldwide    UNSPECIFIED MINOR             64,900            0       64,900
                                                                  Locations.               MILITARY CONSTRUCTION.
  Air Force..........................  Wyoming.................  F.E. Warren Air Force    COST TO COMPLETE:                  0       18,000       18,000
                                                                  Base.                    CONSOLIDATED HELO/TRF
                                                                                           OPS/AMU AND ALERT
                                                                                           FACILITY.
  Air Force..........................  Wyoming.................  F.E. Warren Air Force    GBSD INTEGRATED COMMAND       27,000            0       27,000
                                                                  Base.                    CENTER (INC 2).
  Air Force..........................  Wyoming.................  F.E. Warren Air Force    GBSD INTEGRATED               85,000            0       85,000
                                                                  Base.                    TRAINING CENTER.
  Air Force..........................  Wyoming.................  F.E. Warren Air Force    GBSD MISSILE HANDLING         28,000            0       28,000
                                                                  Base.                    COMPLEX (INC 2).
                                                                                         --------------------------
                                       ........................  .......................  Subtotal Military          2,605,314    1,310,800    3,916,114
                                                                                           Construction, Air
                                                                                           Force.
DEFENSE-WIDE                           ........................  .......................  .......................  ...........  ...........  ...........
  Defense-Wide.......................  Alabama.................  Redstone Arsenal.......  GROUND TEST FACILITY         147,975      -70,000       77,975
                                                                                           INFRASTRUCTURE.
  Defense-Wide.......................  California..............  Marine Corps Air         AMBULATORY CARE CENTER--     103,000      -82,400       20,600
                                                                  Station Miramar.         DENTAL CLINIC ADD//ALT.
  Defense-Wide.......................  California..............  Marine Corps Air         ELECTRICAL                         0       30,550       30,550
                                                                  Station Miramar.         INFRASTRUCTURE, ON-
                                                                                           SITE GENERATION, AND
                                                                                           MICROGRID IMPROVEMENTS.
  Defense-Wide.......................  California..............  Monterey...............  COST TO COMPLETE: COGEN            0        5,460        5,460
                                                                                           PLANT AT B236.
  Defense-Wide.......................  California..............  Mountain View..........  INSTALL MICROGRID,                 0       15,500       15,500
                                                                                           750KW PV, 750KWH BESS,
                                                                                           & 800KW GENERATOR
                                                                                           SYSTEM.
  Defense-Wide.......................  California..............  Naval Base Coronado....  COST TO COMPLETE: ATC              0       11,400       11,400
                                                                                           OPERATIONS SUPPORT
                                                                                           FACILITY.
  Defense-Wide.......................  California..............  Naval Base Coronado....  SOF NAVAL SPECIAL                  0       51,000       51,000
                                                                                           WARFARE COMMAND
                                                                                           OPERATIONS SUPPORT
                                                                                           FACILITY, PHASE 2.
  Defense-Wide.......................  California..............  Naval Base San Diego...  AMBULATORY CARE CENTER--     101,644      -79,460       22,184
                                                                                           DENTAL CLINIC REPLMT.
  Defense-Wide.......................  California..............  Naval Base San Diego...  MICROGRID AND BACKUP               0        6,300        6,300
                                                                                           POWER.
  Defense-Wide.......................  California..............  Naval Base Ventura       COST TO COMPLETE:                  0       16,840       16,840
                                                                  County.                  GROUND MOUNTED SOLAR
                                                                                           PV.
  Defense-Wide.......................  California..............  Vandenberg Space Force   MICROGRID WITH BACKUP              0       57,000       57,000
                                                                  Base.                    POWER.
  Defense-Wide.......................  Colorado................  Buckley Space Force      REDUNDANT ELECTRICAL               0        9,000        9,000
                                                                  Base.                    SUPPLY.
  Defense-Wide.......................  Colorado................  Buckley Space Force      REPLACEMENT WATER WELL.            0        5,700        5,700
                                                                  Base.
  Defense-Wide.......................  Cuba....................  Guantanamo Bay Naval     AMBULATORY CARE CENTER        60,000            0       60,000
                                                                  Station.                 (INC 1).
  Defense-Wide.......................  Delaware................  Dover Air Force Base...  ARMED SERVICES WHOLE               0       30,500       30,500
                                                                                           BLOOD PROCESSING
                                                                                           LABORATORY.
  Defense-Wide.......................  Diego Garcia............  Naval Support Facility   MICROGRID ELECTRIC                 0       16,820       16,820
                                                                  Diego Garcia.            DISTRIBUTION LINE
                                                                                           UPGRADE.
  Defense-Wide.......................  Djibouti................  Camp Lemonnier.........  COST TO COMPLETE:                  0        5,200        5,200
                                                                                           ENHANCE ENERGY
                                                                                           SECURITY AND CONTROL
                                                                                           SYSTEMS.
  Defense-Wide.......................  Florida.................  Naval Air Station        POTABLE WATER                      0       31,220       31,220
                                                                  Whiting Field.           DISTRIBUTION SYSTEM.
  Defense-Wide.......................  Georgia.................  Fort Benning...........  COST TO COMPLETE: 5.2MW            0       27,351       27,351
                                                                                           MICROGRID & GENERATION
                                                                                           PLANT.
  Defense-Wide.......................  Georgia.................  Kings Bay..............  COST TO COMPLETE: SCADA            0        2,700        2,700
                                                                                           MODERNIZATION.
  Defense-Wide.......................  Georgia.................  Naval Submarine Base     COST TO COMPLETE:                  0       25,190       25,190
                                                                  Kings Bay.               ELECTRICAL
                                                                                           TRANSMISSION AND
                                                                                           DISTRIBUTION
                                                                                           IMPROVEMENTS (PHAS.
  Defense-Wide.......................  Georgia.................  Naval Submarine Base     ELECTRICAL TRANSMISSION            0       49,500       49,500
                                                                  Kings Bay.               AND DISTRIBUTION
                                                                                           IMPROVEMENTS, PHASE 2.
  Defense-Wide.......................  Germany.................  Baumholder.............  HUMAN PERFORMANCE                  0       16,700       16,700
                                                                                           TRAINING CENTER.
  Defense-Wide.......................  Germany.................  Baumholder.............  SOF COMPANY OPERATIONS        41,000            0       41,000
                                                                                           FACILITY.
  Defense-Wide.......................  Germany.................  Baumholder.............  SOF JOINT PARACHUTE           23,000            0       23,000
                                                                                           RIGGING FACILITY.
  Defense-Wide.......................  Germany.................  Kaiserslautern Air Base  KAISERSLAUTERN MIDDLE         21,275            0       21,275
                                                                                           SCHOOL.
  Defense-Wide.......................  Germany.................  Ramstein Air Base......  RAMSTEIN MIDDLE SCHOOL.      181,764            0      181,764
  Defense-Wide.......................  Germany.................  Rhine Ordnance Barracks  MEDICAL CENTER                77,210            0       77,210
                                                                                           REPLACEMENT (INC 11).
  Defense-Wide.......................  Germany.................  Stuttgart..............  ROBINSON BARRACKS ELEM         8,000            0        8,000
                                                                                           SCHOOL REPLACEMENT.
  Defense-Wide.......................  Hawaii..................  Joint Base Pearl Harbor- COST TO COMPLETE: FY20             0        7,476        7,476
                                                                  Hickam.                  500 KW PV COVERED
                                                                                           PARKING EV CHARGING
                                                                                           STATION.
  Defense-Wide.......................  Hawaii..................  Joint Base Pearl Harbor- COST TO COMPLETE:                  0       13,040       13,040
                                                                  Hickam.                  PRIMARY ELECTRICAL
                                                                                           DISTRIBUTION.
  Defense-Wide.......................  Honduras................  Soto Cano Air Base.....  FUEL FACILITIES........       41,300            0       41,300
  Defense-Wide.......................  Italy...................  Naples.................  COST TO COMPLETE: SMART            0        7,610        7,610
                                                                                           GRID.
  Defense-Wide.......................  Japan...................  Fleet Activities         KINNICK HIGH SCHOOL           70,000            0       70,000
                                                                  Yokosuka.                (INC).
  Defense-Wide.......................  Japan...................  Kadena Air Base........  PDI: SOF MAINTENANCE          88,900            0       88,900
                                                                                           HANGAR.
  Defense-Wide.......................  Japan...................  Kadena Air Base........  PDI: SOF COMPOSITE            11,400            0       11,400
                                                                                           MAINTENANCE FACILITY.
  Defense-Wide.......................  Kansas..................  Forbes Field...........  MICROGRID AND BACKUP               0        5,850        5,850
                                                                                           POWER.
  Defense-Wide.......................  Kansas..................  Fort Riley.............  COST TO COMPLETE: POWER            0       15,468       15,468
                                                                                           GENERATION AND
                                                                                           MICROGRID.
  Defense-Wide.......................  Korea...................  K-16 Air Base..........  K-16 EMERGENCY BACKUP              0        5,650        5,650
                                                                                           POWER.
  Defense-Wide.......................  Kuwait..................  Camp Arifjan...........  COST TO COMPLETE: POWER            0        8,197        8,197
                                                                                           GENERATION AND
                                                                                           MICROGRID.
  Defense-Wide.......................  Kuwait..................  Camp Buehring..........  MICROGRID AND BACKUP               0       18,850       18,850
                                                                                           POWER.
  Defense-Wide.......................  Louisiana...............  Naval Air Station Joint  COST TO COMPLETE:                  0        6,453        6,453
                                                                  Reserve Base New         DISTRIBUTION
                                                                  Orleans.                 SWITCHGEAR.
  Defense-Wide.......................  Maryland................  Bethesda Naval Hospital  MEDICAL CENTER ADDITION/     101,816            0      101,816
                                                                                           ALTERATION (INC 7).
  Defense-Wide.......................  Maryland................  Fort Meade.............  NSAW MISSION OPS AND         105,000            0      105,000
                                                                                           RECORDS CENTER (INC).
  Defense-Wide.......................  Maryland................  Fort Meade.............  NSAW RECAP BUILDING 4        315,000            0      315,000
                                                                                           (INC).
  Defense-Wide.......................  Maryland................  Fort Meade.............  NSAW RECAP BUILDING 5         65,000            0       65,000
                                                                                           (ECB 5) (INC).
  Defense-Wide.......................  Maryland................  Joint Base Andrews.....  HYDRANT FUELING SYSTEM.       38,300            0       38,300
  Defense-Wide.......................  Missouri................  Lake City Army           MICROGRID AND BACKUP               0       80,100       80,100
                                                                  Ammunition Plant.        POWER.
  Defense-Wide.......................  Montana.................  Great Falls              FUEL FACILITIES........       30,000            0       30,000
                                                                  International Airport.
  Defense-Wide.......................  Nebraska................  Offutt Air Force Base..  DEFENSE POW/MIA                    0        5,000        5,000
                                                                                           ACCOUNTABILITY AGENCY
                                                                                           LABORATORY (P&D).
  Defense-Wide.......................  Nebraska................  Offutt Air Force Base..  MICROGRID AND BACKUP               0       41,000       41,000
                                                                                           POWER.
  Defense-Wide.......................  New Jersey..............  Sea Girt...............  UNDERGROUND ELECTRICAL             0       44,000       44,000
                                                                                           DISTRIBUTION SYSTEM.
  Defense-Wide.......................  North Carolina..........  Fort Liberty...........  COST TO COMPLETE: FORT             0        1,418        1,418
                                                                                           LIBERTY EMERGENCY
                                                                                           WATER SYSTEM.
  Defense-Wide.......................  North Carolina..........  Fort Liberty (Camp       MICROGRID AND BACKUP               0       10,500       10,500
                                                                  Mackall).                POWER.
  Defense-Wide.......................  North Carolina..........  Marine Corps Base Camp   MARINE RAIDER BATTALION            0       70,000       70,000
                                                                  Lejeune.                 OPERATIONS FACILITY.
  Defense-Wide.......................  Oklahoma................  Fort Sill..............  MICROGRID AND BACKUP               0       76,650       76,650
                                                                                           POWER.
  Defense-Wide.......................  Pennsylvania............  Fort Indiantown Gap....  COST TO COMPLETE:                  0        9,250        9,250
                                                                                           GEOTHERMAL AND SOLAR
                                                                                           PV.
  Defense-Wide.......................  Puerto Rico.............  Fort Buchanan..........  MICROGRID AND BACKUP               0       56,000       56,000
                                                                                           POWER.
  Defense-Wide.......................  Puerto Rico.............  Juana Diaz.............  COST TO COMPLETE:                  0        7,680        7,680
                                                                                           MICROGRID CONTROLS,
                                                                                           690 KW PV, 275KW GEN,
                                                                                           570 KWH BESS.
  Defense-Wide.......................  Puerto Rico.............  Ramey..................  COST TO COMPLETE:                  0        6,360        6,360
                                                                                           MICROGRID CONTROL
                                                                                           SYSTEM, 460 KW PV,
                                                                                           275KW GEN, 660 KWH BES.
  Defense-Wide.......................  Spain...................  Naval Station Rota.....  BULK TANK FARM, PHASE 1       80,000            0       80,000
  Defense-Wide.......................  Texas...................  Fort Cavazos...........  CENTRAL CHILLED WATER              0       32,000       32,000
                                                                                           PLANT.
  Defense-Wide.......................  Texas...................  Fort Cavazos...........  COST TO COMPLETE: POWER            0       18,900       18,900
                                                                                           GENERATION AND
                                                                                           MICROGRID.
  Defense-Wide.......................  Texas...................  Fort Cavazos...........  MICROGRID AND BACKUP               0       18,250       18,250
                                                                                           POWER.
  Defense-Wide.......................  Utah....................  Camp Williams..........  MICROGRID & WIND                   0       20,100       20,100
                                                                                           TURBINE.
  Defense-Wide.......................  Utah....................  Hill Air Force Base....  OPEN STORAGE...........       14,200            0       14,200
  Defense-Wide.......................  Virginia................  Fort Belvoir...........  DIA HEADQUARTERS ANNEX.      185,000     -160,000       25,000
  Defense-Wide.......................  Virginia................  Hampton Roads..........  COST TO COMPLETE:                  0        1,200        1,200
                                                                                           BACKUP POWER
                                                                                           GENERATION.
  Defense-Wide.......................  Virginia................  Joint Expeditionary      SOF SDVT2 OPERATIONS          61,000            0       61,000
                                                                  Base Little Creek--      SUPPORT FACILITY.
                                                                  Fort Story.
  Defense-Wide.......................  Virginia................  Fort Belvoir (NGA        COST TO COMPLETE:                  0          550          550
                                                                  Campus East).            CHILLED WATER
                                                                                           REDUNDANCY.
  Defense-Wide.......................  Virginia................  Pentagon...............  HVAC EFFICIENCY                    0        2,250        2,250
                                                                                           UPGRADES.
  Defense-Wide.......................  Virginia................  Pentagon...............  SEC OPS AND PEDESTRIAN        30,600            0       30,600
                                                                                           ACCESS FACS.
  Defense-Wide.......................  Washington..............  Joint Base Lewis-        POWER GENERATION AND               0       49,850       49,850
                                                                  McChord.                 MICROGRID.
  Defense-Wide.......................  Washington..............  Joint Base Lewis-        SOF CONSOLIDATED              62,000            0       62,000
                                                                  McChord.                 RIGGING FACILITY.
  Defense-Wide.......................  Washington..............  Manchester.............  BULK STORAGE TANKS,           71,000            0       71,000
                                                                                           PHASE 2.
  Defense-Wide.......................  Washington..............  Naval Base Kitsap......  MAIN SUBSTATION                    0       31,520       31,520
                                                                                           REPLACEMENT AND
                                                                                           MICROGRID.
  Defense-Wide.......................  Washington..............  Naval Magazine Indian    MICROGRID AND BACKUP               0       37,770       37,770
                                                                  Island.                  POWER.
  Defense-Wide.......................  Washington..............  Naval Undersea Warfare   SOF COLD WATER TRAINING            0       37,000       37,000
                                                                  Center Keyport.          AUSTERE ENVIRONMENT
                                                                                           FACILITY.
  Defense-Wide.......................  Worldwide Unspecified...  Unspecified Worldwide..  INDOPACOM UNSPECIFIED              0       62,000       62,000
                                                                                           MINOR MILITARY
                                                                                           CONSTRUCTION.
  Defense-Wide.......................  Worldwide Unspecified...  Unspecified Worldwide    ENERGY RESILIENCE AND        548,000     -548,000            0
                                                                  Locations.               CONSERV. INVEST. PROG..
  Defense-Wide.......................  Worldwide Unspecified...  Unspecified Worldwide    ERCIP PLANNING & DESIGN       86,250            0       86,250
                                                                  Locations.
  Defense-Wide.......................  Worldwide Unspecified...  Unspecified Worldwide    EXERCISE RELATED MINOR        11,107            0       11,107
                                                                  Locations.               CONSTRUCTION.
  Defense-Wide.......................  Worldwide Unspecified...  Unspecified Worldwide    PLANNING & DESIGN (DHA)       49,610            0       49,610
                                                                  Locations.
  Defense-Wide.......................  Worldwide Unspecified...  Unspecified Worldwide    PLANNING & DESIGN             32,579            0       32,579
                                                                  Locations.               (Defense-Wide).
  Defense-Wide.......................  Worldwide Unspecified...  Unspecified Worldwide    PLANNING & DESIGN             30,215            0       30,215
                                                                  Locations.               (CYBERCOM).
  Defense-Wide.......................  Worldwide Unspecified...  Unspecified Worldwide    PLANNING & DESIGN             25,130            0       25,130
                                                                  Locations.               (SOCOM).

[[Page S3650]]

 
  Defense-Wide.......................  Worldwide Unspecified...  Unspecified Worldwide    PLANNING & DESIGN (DLA)       24,000            0       24,000
                                                                  Locations.
  Defense-Wide.......................  Worldwide Unspecified...  Unspecified Worldwide    PLANNING & DESIGN              8,568            0        8,568
                                                                  Locations.               (DODEA).
  Defense-Wide.......................  Worldwide Unspecified...  Unspecified Worldwide    PLANNING & DESIGN (NSA)        3,068            0        3,068
                                                                  Locations.
  Defense-Wide.......................  Worldwide Unspecified...  Unspecified Worldwide    PLANNING & DESIGN (TJS)        2,000            0        2,000
                                                                  Locations.
  Defense-Wide.......................  Worldwide Unspecified...  Unspecified Worldwide    PLANNING & DESIGN (MDA)        1,035            0        1,035
                                                                  Locations.
  Defense-Wide.......................  Worldwide Unspecified...  Unspecified Worldwide    PLANNING & DESIGN (WHS)          590            0          590
                                                                  Locations.
  Defense-Wide.......................  Worldwide Unspecified...  Unspecified Worldwide    UNSPECIFIED MINOR             19,271            0       19,271
                                                                  Locations.               CONSTRUCTION (SOCOM).
  Defense-Wide.......................  Worldwide Unspecified...  Unspecified Worldwide    UNSPECIFIED MINOR              3,000            0        3,000
                                                                  Locations.               CONSTRUCTION (DEFENSE-
                                                                                           WIDE).
  Defense-Wide.......................  Worldwide Unspecified...  Various Worldwide        UNSPECIFIED MINOR              4,875            0        4,875
                                                                  Locations.               CONSTRUCTION (DLA).
  Defense-Wide.......................  Wyoming.................  F.E. Warren Air Force    MICROGRID AND BATTERY              0       25,000       25,000
                                                                  Base.                    STORAGE.
                                                                                         --------------------------
                                                                                            Subtotal Military        2,984,682      307,013    3,291,695
                                                                                           Construction, Defense-
                                                                                           Wide.
  ARMY NATIONAL GUARD
  Army National Guard................  Alabama.................  Fort McClellan.........  COST TO COMPLETE:                  0        7,000        7,000
                                                                                           ENLISTED BARRACKS, TT.
  Army National Guard................  Alabama.................  Huntsville.............  COST TO COMPLETE:                  0        4,650        4,650
                                                                                           NATIONAL GUARD
                                                                                           READINESS CENTER.
  Army National Guard................  Arizona.................  Surprise Readiness       NATIONAL GUARD                15,000            0       15,000
                                                                  Center.                  READINESS CENTER.
  Army National Guard................  Arkansas................  Fort Chaffee...........  COST TO COMPLETE:                  0          610          610
                                                                                           NATIONAL GUARD
                                                                                           READINESS CENTER.
  Army National Guard................  California..............  Bakersfield............  COST TO COMPLETE:                  0        1,000        1,000
                                                                                           VEHICLE MAINTENANCE
                                                                                           SHOP.
  Army National Guard................  California..............  Camp Roberts...........  COST TO COMPLETE:                  0        5,000        5,000
                                                                                           AUTOMATED MULTIPURPOSE
                                                                                           MACHINE GUN (MPMG)
                                                                                           RANGE.
  Army National Guard................  Colorado................  Peterson Space Force     COST TO COMPLETE:                  0        3,000        3,000
                                                                  Base.                    NATIONAL GUARD
                                                                                           READINESS CENTER.
  Army National Guard................  Connecticut.............  Putnam.................  COST TO COMPLETE:                  0        6,125        6,125
                                                                                           NATIONAL GUARD
                                                                                           READINESS CENTER.
  Army National Guard................  Florida.................  Camp Blanding..........  MULTIPURPOSE MACHINE               0       11,000       11,000
                                                                                           GUN RANGE.
  Army National Guard................  Guam....................  Barrigada..............  COST TO COMPLETE:                  0        6,900        6,900
                                                                                           NATIONAL GUARD
                                                                                           READINESS CENTER.
  Army National Guard................  Idaho...................  Jerome.................  COST TO COMPLETE:                  0        1,250        1,250
                                                                                           NATIONAL GUARD
                                                                                           READINESS CENTER.
  Army National Guard................  Idaho...................  Jerome County Regional   NATIONAL GUARD VEHICLE        17,000            0       17,000
                                                                  Site.                    MAINTENANCE SHOP.
  Army National Guard................  Illinois................  Bloomington............  COST TO COMPLETE:                  0        5,250        5,250
                                                                                           NATIONAL GUARD VEHICLE
                                                                                           MAINTENANCE SHOP.
  Army National Guard................  Illinois................  North Riverside Armory.  NATIONAL GUARD VEHICLE        24,000            0       24,000
                                                                                           MAINTENANCE SHOP.
  Army National Guard................  Indiana.................  Shelbyville............  COST TO COMPLETE:                  0        5,000        5,000
                                                                                           NATIONAL GUARD
                                                                                           READINESS CENTER ADD/
                                                                                           ALT.
  Army National Guard................  Kansas..................  Topeka.................  COST TO COMPLETE:                  0        5,856        5,856
                                                                                           NATIONAL GUARD/RESERVE
                                                                                           CENTER BUILDING.
  Army National Guard................  Kentucky................  Burlington.............  VEHICLE MAINTENANCE                0       16,400       16,400
                                                                                           SHOP.
  Army National Guard................  Kentucky................  Frankfort..............  COST TO COMPLETE:                  0        2,000        2,000
                                                                                           NATIONAL GUARD/RESERVE
                                                                                           CENTER BUILDING.
  Army National Guard................  Louisiana...............  Camp Beauregard........  COLLECTIVE TRAINING                0        2,400        2,400
                                                                                           UNACCOMPANIED HOUSING
                                                                                           OPEN-BAY (P&D).
  Army National Guard................  Louisiana...............  Camp Beauregard........  COST TO COMPLETE:                  0        2,000        2,000
                                                                                           NATIONAL GUARD
                                                                                           READINESS CENTER.
  Army National Guard................  Louisiana...............  Camp Minden............  COST TO COMPLETE:                  0        3,718        3,718
                                                                                           COLLECTIVE TRAINING
                                                                                           UNACCOMPANIED HOUSING,
                                                                                           OPEN BAY.
  Army National Guard................  Maine...................  Northern Maine Range     AUTOMATED MULTIPURPOSE             0        2,800        2,800
                                                                  Complex.                 MACHINE GUN RANGE
                                                                                           (P&D).
  Army National Guard................  Maine...................  Saco...................  COST TO COMPLETE:                  0        7,420        7,420
                                                                                           NATIONAL GUARD VEHICLE
                                                                                           MAINTENANCE SHOP.
  Army National Guard................  Massachusetts...........  Camp Edwards...........  COST TO COMPLETE:                  0        3,000        3,000
                                                                                           AUTOMATED MULTIPURPOSE
                                                                                           MACHINE GUN (MPMG)
                                                                                           RANGE.
  Army National Guard................  Mississippi.............  Camp Shelby............  CAMP SHELBY JFTC                   0        2,200        2,200
                                                                                           RAILHEAD EXPANSION
                                                                                           (P&D).
  Army National Guard................  Mississippi.............  Camp Shelby............  COST TO COMPLETE:                  0        5,425        5,425
                                                                                           MANEUVER AREA TRAINING
                                                                                           EQUIPMENT SITE
                                                                                           ADDITION.
  Army National Guard................  Mississippi.............  Southaven..............  NATIONAL GUARD                     0       22,000       22,000
                                                                                           READINESS CENTER.
  Army National Guard................  Missouri................  Belle Fontaine.........  NATIONAL GUARD                28,000            0       28,000
                                                                                           READINESS CENTER.
  Army National Guard................  Nebraska................  Bellevue...............  COST TO COMPLETE:                  0        9,090        9,090
                                                                                           NATIONAL GUARD
                                                                                           READINESS CENTER.
  Army National Guard................  Nebraska................  Greenlief Training Site  COLLECTIVE TRAINING                0        1,200        1,200
                                                                                           UNACCOMPANIED HOUSING
                                                                                           OPEN-BAY (P&D).
  Army National Guard................  Nebraska................  Mead Training Site.....  COST TO COMPLETE:                  0        1,912        1,912
                                                                                           COLLECTIVE TRAINING
                                                                                           UNACCOMPANIED HOUSING,
                                                                                           OPEN BAY.
  Army National Guard................  Nebraska................  North Platte...........  COST TO COMPLETE:                  0          400          400
                                                                                           NATIONAL GUARD VEHICLE
                                                                                           MAINTENANCE SHOP.
  Army National Guard................  New Hampshire...........  Concord................  COST TO COMPLETE:                  0          200          200
                                                                                           NATIONAL GUARD
                                                                                           READINESS CENTER.
  Army National Guard................  New Hampshire...........  Littleton..............  NATIONAL GUARD VEHICLE        23,000            0       23,000
                                                                                           MAINTENANCE SHOP ADD.
  Army National Guard................  New Jersey..............  Joint Base McGuire-Dix-  COST TO COMPLETE:                  0          605          605
                                                                  Lakehurst.               NATIONAL GUARD
                                                                                           READINESS CENTER.
  Army National Guard................  New Mexico..............  Rio Rancho Training      NATIONAL GUARD VEHICLE        11,000            0       11,000
                                                                  Site.                    MAINTENANCE SHOP ADD.
  Army National Guard................  New York................  Lexington Avenue Armory  NATIONAL GUARD                     0       70,000       70,000
                                                                                           READINESS CENTER.
  Army National Guard................  North Carolina..........  Salisbury..............  ARMY AVIATION SUPPORT              0        2,200        2,200
                                                                                           FACILITIES (P&D).
  Army National Guard................  North Dakota............  Camp Grafton...........  INSTITUTIONAL POST-                0        1,950        1,950
                                                                                           INITIAL MILITARY
                                                                                           TRAINING,
                                                                                           UNACCOMPANIED HOUSING
                                                                                           (P&D).
  Army National Guard................  North Dakota............  Dickinson..............  COST TO COMPLETE:                  0        5,425        5,425
                                                                                           NATIONAL GUARD
                                                                                           READINESS CENTER.
  Army National Guard................  Ohio....................  Camp Perry Joint         NATIONAL GUARD                19,200            0       19,200
                                                                  Training Center.         READINESS CENTER.
  Army National Guard................  Ohio....................  Columbus...............  COST TO COMPLETE:                  0        4,000        4,000
                                                                                           NATIONAL GUARD
                                                                                           READINESS CENTER.
  Army National Guard................  Oklahoma................  Ardmore................  COST TO COMPLETE:                  0          400          400
                                                                                           VEHICLE MAINTENANCE
                                                                                           SHOP.
  Army National Guard................  Oregon..................  Washington County        NATIONAL GUARD                26,000            0       26,000
                                                                  Readiness Center.        READINESS CENTER.
  Army National Guard................  Pennsylvania............  Hermitage Readiness      NATIONAL GUARD                13,600            0       13,600
                                                                  Center.                  READINESS CENTER.
  Army National Guard................  Pennsylvania............  Moon Township..........  COST TO COMPLETE:                  0        3,100        3,100
                                                                                           COMBINED SUPPORT
                                                                                           MAINTENANCE SHOP.
  Army National Guard................  Puerto Rico.............  Fort Allen.............  COST TO COMPLETE:                  0        3,678        3,678
                                                                                           NATIONAL GUARD
                                                                                           READINESS CENTER.
  Army National Guard................  Rhode Island............  Camp Fogarty Training    COLLECTIVE TRAINING                0        1,990        1,990
                                                                  Site.                    UNACCOMPANIED HOUSING
                                                                                           OPEN-BAY (P&D).
  Army National Guard................  Rhode Island............  North Kingstown........  NATIONAL GUARD                     0       30,000       30,000
                                                                                           READINESS CENTER.
  Army National Guard................  South Carolina..........  Aiken County Readiness   NATIONAL GUARD                20,000            0       20,000
                                                                  Center.                  READINESS CENTER.
  Army National Guard................  South Carolina..........  Joint Base Charleston..  COST TO COMPLETE:                  0        4,373        4,373
                                                                                           NATIONAL GUARD
                                                                                           READINESS CENTER.
  Army National Guard................  South Carolina..........  McCrady Training Center  AUTOMATED MULTIPURPOSE         7,900            0        7,900
                                                                                           MACHINE GUN RANGE.
  Army National Guard................  South Dakota............  Sioux Falls............  COST TO COMPLETE:                  0        5,250        5,250
                                                                                           NATIONAL GUARD
                                                                                           READINESS CENTER.
  Army National Guard................  Tennessee...............  Campbell Army Air Field  ARMY AIR TRAFFIC                   0        2,500        2,500
                                                                                           CONTROL TOWERS (P&D).
  Army National Guard................  Tennessee...............  McMinnville............  COST TO COMPLETE:                  0          500          500
                                                                                           NATIONAL GUARD
                                                                                           READINESS CENTER.
  Army National Guard................  Texas...................  Fort Cavazos...........  GENERAL INSTRUCTION                0        2,685        2,685
                                                                                           BUILDING (P&D).
  Army National Guard................  Texas...................  Fort Worth.............  COST TO COMPLETE:                  0        6,489        6,489
                                                                                           AIRCRAFT MAINTENANCE
                                                                                           HANGAR ADD/ALT.
  Army National Guard................  Texas...................  Fort Worth.............  COST TO COMPLETE:                  0          381          381
                                                                                           NATIONAL GUARD VEHICLE
                                                                                           MAINTENANCE SHOP.
  Army National Guard................  Utah....................  Camp Williams..........  COLLECTIVE TRAINING                0        2,875        2,875
                                                                                           UNACCOMPANIED HOUSING,
                                                                                           SENIOR NCO AND OFFICER
                                                                                           (P&D).
  Army National Guard................  Vermont.................  Bennington.............  COST TO COMPLETE:                  0        3,415        3,415
                                                                                           NATIONAL GUARD
                                                                                           READINESS CENTER.
  Army National Guard................  Virgin Islands..........  St. Croix..............  COST TO COMPLETE: ARMY             0        4,200        4,200
                                                                                           AVIATION SUPPORT
                                                                                           FACILITY.
  Army National Guard................  Virgin Islands..........  St. Croix..............  COST TO COMPLETE: READY            0        1,710        1,710
                                                                                           BUILDING.
  Army National Guard................  Virginia................  Sandston RC & FMS 1....  AIRCRAFT MAINTENANCE          20,000            0       20,000
                                                                                           HANGAR.
  Army National Guard................  Virginia................  Troutville.............  COST TO COMPLETE:                  0        2,415        2,415
                                                                                           COMBINED SUPPORT
                                                                                           MAINTENANCE SHOP
                                                                                           ADDITION.
  Army National Guard................  Virginia................  Troutville.............  COST TO COMPLETE:                  0        2,135        2,135
                                                                                           NATIONAL GUARD
                                                                                           READINESS CENTER
                                                                                           ADDITION.
  Army National Guard................  West Virginia...........  Parkersburg............  NATIONAL GUARD                     0        3,300        3,300
                                                                                           READINESS CENTER (P&D).
  Army National Guard................  Wisconsin...............  Viroqua................  NATIONAL GUARD                18,200            0       18,200
                                                                                           READINESS CENTER.
  Army National Guard................  Worldwide Unspecified...  Unspecified Worldwide    PLANNING & DESIGN......       34,286            0       34,286
                                                                  Locations.
  Army National Guard................  Worldwide Unspecified...  Unspecified Worldwide    UNSPECIFIED MINOR             63,000            0       63,000
                                                                  Locations.               CONSTRUCTION.
                                       ........................  .......................  Subtotal Military            340,186      310,382      650,568
                                                                                           Construction, Army
                                                                                           National Guard.
ARMY RESERVE                           ........................  .......................  .......................  ...........  ...........  ...........
  Army Reserve.......................  Alabama.................  Birmingham.............  ARMY RESERVE CENTER/          57,000            0       57,000
                                                                                           AMSA/LAND.
  Army Reserve.......................  Arizona.................  San Tan Valley.........  AREA MAINTENANCE              12,000            0       12,000
                                                                                           SUPPORT ACTIVITY.
  Army Reserve.......................  California..............  Camp Pendleton.........  COST TO COMPLETE: AREA             0        3,000        3,000
                                                                                           MAINTENANCE SUPPORT
                                                                                           ACTIVITY.
  Army Reserve.......................  California..............  Fort Hunter Liggett....  NETWORK ENTERPRISE                 0       40,000       40,000
                                                                                           CENTER.
  Army Reserve.......................  California..............  Parks Reserve Forces     ADVANCED SKILLS                    0       35,000       35,000
                                                                  Training Area.           TRAINING BARRACKS.
  Army Reserve.......................  Georgia.................  Marine Corps Logistics   ARMY RESERVE CENTER....            0       40,000       40,000
                                                                  Base Albany.
  Army Reserve.......................  Florida.................  Perrine................  COST TO COMPLETE: ARMY             0        3,000        3,000
                                                                                           RESERVE CENTER.
  Army Reserve.......................  Massachusetts...........  Devens Reserve Forces    COLLECTIVE TRAINING                0       39,000       39,000
                                                                  Training Area.           ENLISTED BARRACKS.
  Army Reserve.......................  North Carolina..........  Asheville..............  COST TO COMPLETE: ARMY             0       12,000       12,000
                                                                                           RESERVE CENTER.
  Army Reserve.......................  Ohio....................  Wright-Patterson Air     COST TO COMPLETE: ARMY             0        5,000        5,000
                                                                  Force Base.              RESERVE CENTER.
  Army Reserve.......................  Puerto Rico.............  Fort Buchanan..........  ADVANCED SKILLS                    0       39,000       39,000
                                                                                           TRAINING BARRACKS.
  Army Reserve.......................  Worldwide Unspecified...  Unspecified Worldwide    PLANNING & DESIGN......       23,389            0       23,389
                                                                  Locations.
  Army Reserve.......................  Worldwide Unspecified...  Unspecified Worldwide    UNSPECIFIED MINOR             14,687            0       14,687
                                                                  Locations.               CONSTRUCTION.
                                                                                         --------------------------
                                       ........................  .......................  Subtotal Military            107,076      216,000      323,076
                                                                                           Construction, Army
                                                                                           Reserve.
NAVY RESERVE & MARINE CORPS RESERVE    ........................  .......................  .......................  ...........  ...........  ...........
  Navy Reserve & Marine Corps Reserve  Michigan................  Battle Creek...........  ORGANIC SUPPLY                24,549            0       24,549
                                                                                           FACILITIES.
  Navy Reserve & Marine Corps Reserve  Virginia................  Marine Forces Reserve    G/ATOR SUPPORT                12,400            0       12,400
                                                                  Dam Neck Virginia        FACILITIES.
                                                                  Beach.
  Navy Reserve & Marine Corps Reserve  Worldwide Unspecified...  Unspecified Worldwide    MCNR PLANNING & DESIGN.        6,495            0        6,495
                                                                  Locations.

[[Page S3651]]

 
  Navy Reserve & Marine Corps Reserve  Worldwide Unspecified...  Unspecified Worldwide    MCNR UNSPECIFIED MINOR         7,847            0        7,847
                                                                  Locations.               CONSTRUCTION.
                                                                                         --------------------------
                                       ........................  .......................  Subtotal Military             51,291            0       51,291
                                                                                           Construction, Navy
                                                                                           Reserve & Marine Corps
                                                                                           Reserve.
AIR NATIONAL GUARD                     ........................  .......................  .......................  ...........  ...........  ...........
  Air National Guard.................  Alabama.................  Montgomery Regional      F-35 ADAL SQ OPS BLDG          7,000            0        7,000
                                                                  Airport.                 1303.
  Air National Guard.................  Alaska..................  Eielson Air Force Base.  AMC STANDARD DUAL BAY              0        3,700        3,700
                                                                                           HANGAR (P&D).
  Air National Guard.................  Alaska..................  Joint Base Elmendorf-    ADAL ALERT CREW                    0        7,000        7,000
                                                                  Richardson.              FACILITY HGR 18.
  Air National Guard.................  Arizona.................  Tucson International     MCCA: AIRCRAFT                11,600            0       11,600
                                                                  Airport.                 ARRESTING SYSTEM (NEW
                                                                                           RWY).
  Air National Guard.................  Arkansas................  Ebbing Air National      3-BAY HANGAR...........            0       54,000       54,000
                                                                  Guard Base.
  Air National Guard.................  Arkansas................  Ebbing Air National      AIRCREW FLIGHT                     0        9,300        9,300
                                                                  Guard Base.              EQUIPMENT/STEP.
  Air National Guard.................  Arkansas................  Ebbing Air National      SPECIAL ACCESS PROGRAM             0       12,700       12,700
                                                                  Guard Base.              FACILITY.
  Air National Guard.................  Colorado................  Buckley Space Force      AIRCRAFT CORROSION            12,000            0       12,000
                                                                  Base.                    CONTROL.
  Air National Guard.................  Georgia.................  Savannah/Hilton Head     DINING HALL AND                    0       27,000       27,000
                                                                  International Airport.   SERVICES TRAINING
                                                                                           FACILITY.
  Air National Guard.................  Indiana.................  Fort Wayne               FIRE STATION...........        8,900            0        8,900
                                                                  International Airport.
  Air National Guard.................  Mississippi.............  Field Air National       COST TO COMPLETE: 172ND            0        8,000        8,000
                                                                  Guard Base.              AIRLIFT WING FIRE/
                                                                                           CRASH RESCUE STATION.
  Air National Guard.................  Missouri................  Rosecrans Air National   139TH AIRLIFT WING                 0        2,000        2,000
                                                                  Guard Base.              ENTRY CONTROL POINT
                                                                                           (P&D).
  Air National Guard.................  Missouri................  Rosecrans Air National   ENTRY CONTROL POINT                0        2,000        2,000
                                                                  Guard Base.              (P&D).
  Air National Guard.................  Oregon..................  Portland International   SPECIAL TACTICS               22,000            0       22,000
                                                                  Airport.                 COMPLEX, PHASE 1.
  Air National Guard.................  Oregon..................  Portland International   SPECIAL TACTICS               18,500            0       18,500
                                                                  Airport.                 COMPLEX, PHASE 2.
  Air National Guard.................  Oregon..................  Portland International   SPECIAL TACTICS                    0       20,000       20,000
                                                                  Airport.                 COMPLEX, PHASE 3.
  Air National Guard.................  Oregon..................  Portland International   SPECIAL TACTICS                    0       11,000       11,000
                                                                  Airport.                 COMPLEX, PHASE 4.
  Air National Guard.................  Pennsylvania............  Harrisburg               ENTRY CONTROL FACILITY.            0        8,000        8,000
                                                                  International Airport.
  Air National Guard.................  Wisconsin...............  Truax Field............  F-35: MM&I FAC, B701...            0        5,200        5,200
  Air National Guard.................  Wisconsin...............  Volk Air National Guard  FIRE/CRASH RESCUE                  0          670          670
                                                                  Base.                    STATION (P&D).
  Air National Guard.................  Worldwide Unspecified...  Unspecified Worldwide    PLANNING & DESIGN......       35,600            0       35,600
                                                                  Locations.
  Air National Guard.................  Worldwide Unspecified...  Unspecified Worldwide    UNSPECIFIED MINOR             63,122            0       63,122
                                                                  Locations.               CONSTRUCTION.
                                                                                         --------------------------
                                       ........................  .......................  Subtotal Military            178,722      170,570      349,292
                                                                                           Construction, Air
                                                                                           National Guard.
  AIR FORCE RESERVE                    ........................  .......................  .......................  ...........  ...........  ...........
  Air Force Reserve..................  Arizona.................  Davis-Monthan Air Force  GUARDIAN ANGEL POTFF               0        8,500        8,500
                                                                  Base.                    FACILITY.
 
  Air Force Reserve..................  California..............  March Air Reserve Base.  KC-46 ADD/ALTER B1244         17,000            0       17,000
                                                                                           FUT/CARGO PALLET
                                                                                           STORAGE.
  Air Force Reserve..................  California..............  March Air Reserve Base.  KC-46 ADD/ALTER B6000          8,500            0        8,500
                                                                                           SIMULATOR FACILITY.
  Air Force Reserve..................  California..............  March Air Reserve Base.  KC-46 TWO BAY                201,000            0      201,000
                                                                                           MAINTENANCE/FUEL
                                                                                           HANGAR.
  Air Force Reserve..................  Guam....................  Joint Region Marianas..  AERIAL PORT FACILITY...       27,000            0       27,000
  Air Force Reserve..................  Louisiana...............  Barksdale Air Force      307 BW MEDICAL FACILITY            0        7,000        7,000
                                                                  Base.                    ADDITION.
  Air Force Reserve..................  Ohio....................  Youngstown Air Reserve   BASE FIRE STATION (P&D)            0        2,500        2,500
                                                                  Station.
  Air Force Reserve..................  Texas...................  Naval Air Station Joint  LRS WAREHOUSE..........       16,000            0       16,000
                                                                  Reserve Base Fort
                                                                  Worth.
  Air Force Reserve..................  Worldwide Unspecified...  Unspecified Worldwide    PLANNING & DESIGN......       12,146            0       12,146
                                                                  Locations.
  Air Force Reserve..................  Worldwide Unspecified...  Unspecified Worldwide    UNSPECIFIED MINOR              9,926            0        9,926
                                                                  Locations.               MILITARY CONSTRUCTION.
                                                                                         --------------------------
                                       ........................  .......................  Subtotal Military            291,572       18,000      309,572
                                                                                           Construction, Air
                                                                                           Force Reserve.
NATO SECURITY INVESTMENT PROGRAM       ........................  .......................  .......................  ...........  ...........  ...........
  NATO...............................  Worldwide Unspecified...  NATO Security            NATO SECURITY                293,434            0      293,434
                                                                  Investment Program.      INVESTMENT PROGRAM.
                                       ........................  .......................  Subtotal NATO Security       293,434            0      293,434
                                                                                           Investment Program.
INDOPACIFIC COMBATANT COMMAND          ........................  .......................  .......................  ...........  ...........  ...........
  MILCON, INDOPACOM..................  Worldwide Unspecified...  Unspecified Worldwide    INDOPACOM MILITARY                 0      150,000      150,000
                                                                  Locations.               CONSTRUCTION PILOT
                                                                                           PROGRAM.
                                                                                          Subtotal Base                      0      150,000      150,000
                                                                                           Realignment and
                                                                                           Closure--Defense-Wide.
                                                                                          TOTAL INDOPACIFIC                  0      150,000      150,000
                                                                                           COMBATANT COMMAND.
                                                                                          TOTAL MILITARY            14,345,019    2,359,215   16,704,234
                                                                                           CONSTRUCTION.
FAMILY HOUSING
FAMILY HOUSING CONSTRUCTION, ARMY
  Fam Hsg Con, Army..................  Georgia.................  Fort Eisenhower........  FORT EISENHOWER MHPI          50,000            0       50,000
                                                                                           EQUITY INVESTMENT.
  Fam Hsg Con, Army..................  Germany.................  Baumholder.............  FAMILY HOUSING NEW            78,746            0       78,746
                                                                                           CONSTRUCTION.
  Fam Hsg Con, Army..................  Kwajalein...............  Kwajalein Atoll........  FAMILY HOUSING                98,600            0       98,600
                                                                                           REPLACEMENT
                                                                                           CONSTRUCTION.
  Fam Hsg Con, Army..................  Missouri................  Fort Leonard Wood......  FORT LEONARD WOOD MHPI        50,000            0       50,000
                                                                                           EQUITY INVESTMENT.
  Fam Hsg Con, Army..................  Worldwide Unspecified...  Unspecified Worldwide    FAMILY HOUSING P&D.....       27,549            0       27,549
                                                                  Locations.
                                                                                         --------------------------
                                                                                          Subtotal Family Housing      304,895            0      304,895
                                                                                           Construction, Army.
FAMILY HOUSING O&M, ARMY
  Fam Hsg O&M, Army..................  Worldwide Unspecified...  Unspecified Worldwide    FURNISHINGS............       12,121            0       12,121
                                                                  Locations.
  Fam Hsg O&M, Army..................  Worldwide Unspecified...  Unspecified Worldwide    HOUSING PRIVATIZATION         86,019            0       86,019
                                                                  Locations.               SUPPORT.
  Fam Hsg O&M, Army..................  Worldwide Unspecified...  Unspecified Worldwide    LEASING................      112,976            0      112,976
                                                                  Locations.
  Fam Hsg O&M, Army..................  Worldwide Unspecified...  Unspecified Worldwide    MAINTENANCE............       86,706            0       86,706
                                                                  Locations.
  Fam Hsg O&M, Army..................  Worldwide Unspecified...  Unspecified Worldwide    MANAGEMENT.............       41,121            0       41,121
                                                                  Locations.
  Fam Hsg O&M, Army..................  Worldwide Unspecified...  Unspecified Worldwide    MISCELLANEOUS..........          554            0          554
                                                                  Locations.
  Fam Hsg O&M, Army..................  Worldwide Unspecified...  Unspecified Worldwide    SERVICES...............        7,037            0        7,037
                                                                  Locations.
  Fam Hsg O&M, Army..................  Worldwide Unspecified...  Unspecified Worldwide    UTILITIES..............       38,951            0       38,951
                                                                  Locations.
                                                                                         --------------------------
                                                                                          Subtotal Family Housing      385,485            0      385,485
                                                                                           Operation And
                                                                                           Maintenance, Army.
FAMILY HOUSING CONSTRUCTION, NAVY &
 MARINE CORPS
  Fam Hsg Con, Navy & Marine Corps...  Guam....................  Joint Region Marianas..  REPLACE ANDERSEN             121,906            0      121,906
                                                                                           HOUSING, PHASE 8.
  Fam Hsg Con, Navy & Marine Corps...  Guam....................  Naval Support Activity   REPLACE ANDERSEN              83,126            0       83,126
                                                                  Andersen.                HOUSING (AF), PHASE 7.
  Fam Hsg Con, Navy & Marine Corps...  Worldwide Unspecified...  Unspecified Worldwide    DESIGN, WASHINGTON DC..        4,782            0        4,782
                                                                  Locations.
  Fam Hsg Con, Navy & Marine Corps...  Worldwide Unspecified...  Unspecified Worldwide    IMPROVEMENTS,                 57,740            0       57,740
                                                                  Locations.               WASHINGTON DC.
  Fam Hsg Con, Navy & Marine Corps...  Worldwide Unspecified...  Unspecified Worldwide    USMC DPRI/GUAM PLANNING        9,588            0        9,588
                                                                  Locations.               & DESIGN.
                                                                                         --------------------------
                                                                                          Subtotal Family Housing      277,142            0      277,142
                                                                                           Construction, Navy &
                                                                                           Marine Corps.
FAMILY HOUSING O&M, NAVY & MARINE
 CORPS
  Fam Hsg O&M, Navy & Marine Corps...  Worldwide Unspecified...  Unspecified Worldwide    FURNISHINGS............       17,744            0       17,744
                                                                  Locations.
  Fam Hsg O&M, Navy & Marine Corps...  Worldwide Unspecified...  Unspecified Worldwide    HOUSING PRIVATIZATION         65,655            0       65,655
                                                                  Locations.               SUPPORT.
  Fam Hsg O&M, Navy & Marine Corps...  Worldwide Unspecified...  Unspecified Worldwide    LEASING................       60,214            0       60,214
                                                                  Locations.
  Fam Hsg O&M, Navy & Marine Corps...  Worldwide Unspecified...  Unspecified Worldwide    MAINTENANCE............      101,356            0      101,356
                                                                  Locations.
  Fam Hsg O&M, Navy & Marine Corps...  Worldwide Unspecified...  Unspecified Worldwide    MANAGEMENT.............       61,896            0       61,896
                                                                  Locations.
  Fam Hsg O&M, Navy & Marine Corps...  Worldwide Unspecified...  Unspecified Worldwide    MISCELLANEOUS..........          419            0          419
                                                                  Locations.
  Fam Hsg O&M, Navy & Marine Corps...  Worldwide Unspecified...  Unspecified Worldwide    SERVICES...............       13,250            0       13,250
                                                                  Locations.
  Fam Hsg O&M, Navy & Marine Corps...  Worldwide Unspecified...  Unspecified Worldwide    UTILITIES..............       43,320            0       43,320
                                                                  Locations.
                                                                                         --------------------------
                                                                                          Subtotal Family Housing      363,854            0      363,854
                                                                                           Operation &
                                                                                           Maintenance, Navy &
                                                                                           Marine Corps.
FAMILY HOUSING CONSTRUCTION, AIR
 FORCE
  Fam Hsg Con, Air Force.............  Alabama.................  Maxwell Air Force Base.  MHPI RESTRUCTURE-AETC         65,000            0       65,000
                                                                                           GROUP II.

[[Page S3652]]

 
  Fam Hsg Con, Air Force.............  Colorado................  U.S. Air Force Academy.  CONSTRUCTION                   9,282            0        9,282
                                                                                           IMPROVEMENT--CARLTON
                                                                                           HOUSE.
  Fam Hsg Con, Air Force.............  Hawaii..................  Joint Base Pearl Harbor- MHPI RESTRUCTURE-JOINT        75,000            0       75,000
                                                                  Hickam.                  BASE PEARL HARBOR-
                                                                                           HICKAM.
  Fam Hsg Con, Air Force.............  Mississippi.............  Keesler Air Force Base.  MHPI RESTRUCTURE-             80,000            0       80,000
                                                                                           SOUTHERN GROUP.
  Fam Hsg Con, Air Force.............  Japan...................  Yokota Air Base........  IMPROVE FAMILY HOUSING             0       27,000       27,000
                                                                                           PAIP 9, PHASE 1 (24
                                                                                           UNITS).
  Fam Hsg Con, Air Force.............  Worldwide Unspecified...  Unspecified Worldwide    PLANNING & DESIGN......        7,815            0        7,815
                                                                  Locations.
                                                                                         --------------------------
                                                                                          Subtotal Family Housing      237,097       27,000      264,097
                                                                                           Construction, Air
                                                                                           Force.
FAMILY HOUSING O&M, AIR FORCE
  Fam Hsg O&M, Air Force.............  Worldwide Unspecified...  Unspecified Worldwide    FURNISHINGS............       12,884       11,000       23,884
                                                                  Locations.
  Fam Hsg O&M, Air Force.............  Worldwide Unspecified...  Unspecified Worldwide    HOUSING PRIVATIZATION         31,803            0       31,803
                                                                  Locations.               SUPPORT.
  Fam Hsg O&M, Air Force.............  Worldwide Unspecified...  Unspecified Worldwide    LEASING................        5,143            0        5,143
                                                                  Locations.
  Fam Hsg O&M, Air Force.............  Worldwide Unspecified...  Unspecified Worldwide    MAINTENANCE............      135,410      -11,000      124,410
                                                                  Locations.
  Fam Hsg O&M, Air Force.............  Worldwide Unspecified...  Unspecified Worldwide    MANAGEMENT.............       68,023            0       68,023
                                                                  Locations.
  Fam Hsg O&M, Air Force.............  Worldwide Unspecified...  Unspecified Worldwide    MISCELLANEOUS..........        2,377            0        2,377
                                                                  Locations.
  Fam Hsg O&M, Air Force.............  Worldwide Unspecified...  Unspecified Worldwide    SERVICES...............       10,692            0       10,692
                                                                  Locations.
  Fam Hsg O&M, Air Force.............  Worldwide Unspecified...  Unspecified Worldwide    UTILITIES..............       48,054            0       48,054
                                                                  Locations.
                                                                                         --------------------------
                                                                                          Subtotal Family Housing      314,386            0      314,386
                                                                                           Operation And
                                                                                           Maintenance, Air Force.
FAMILY HOUSING O&M, DEFENSE-WIDE
  Fam Hsg O&M, Defense-Wide..........  Worldwide Unspecified...  Unspecified Worldwide    FURNISHINGS (DIA)......          673            0          673
                                                                  Locations.
  Fam Hsg O&M, Defense-Wide..........  Worldwide Unspecified...  Unspecified Worldwide    FURNISHINGS (NSA)......           89            0           89
                                                                  Locations.
  Fam Hsg O&M, Defense-Wide..........  Worldwide Unspecified...  Unspecified Worldwide    LEASING (DIA)..........       32,042            0       32,042
                                                                  Locations.
  Fam Hsg O&M, Defense-Wide..........  Worldwide Unspecified...  Unspecified Worldwide    LEASING (NSA)..........       13,658            0       13,658
                                                                  Locations.
  Fam Hsg O&M, Defense-Wide..........  Worldwide Unspecified...  Unspecified Worldwide    MAINTENANCE............           35            0           35
                                                                  Locations.
  Fam Hsg O&M, Defense-Wide..........  Worldwide Unspecified...  Unspecified Worldwide    UTILITIES (DIA)........        4,273            0        4,273
                                                                  Locations.
  Fam Hsg O&M, Defense-Wide..........  Worldwide Unspecified...  Unspecified Worldwide    UTILITIES (NSA)........           15            0           15
                                                                  Locations.
                                                                                         --------------------------
                                                                                          Subtotal Family Housing       50,785            0       50,785
                                                                                           Operation And
                                                                                           Maintenance, Defense-
                                                                                           Wide.
FAMILY HOUSING IMPROVEMENT FUND
  Family Housing Improvement Fund....  Worldwide Unspecified...  Unspecified Worldwide    ADMINISTRATIVE                 6,611            0        6,611
                                                                  Locations.               EXPENSES--FHIF.
                                                                                         --------------------------
                                                                                          Subtotal Family Housing        6,611            0        6,611
                                                                                           Improvement Fund.
UNACCOMPANIED HOUSING IMPROVEMENT
 FUND
  Unaccompanied Housing Improvement    Worldwide Unspecified     ADMINISTRATIVE           496....................            0          496
   Fund.                                Unspecified Worldwide     EXPENSES--UHIF.
                                        Locations.
                                                                                         --------------------------
                                                                                          Subtotal Unaccompanied           496            0          496
                                                                                           Housing Improvement
                                                                                           Fund.
                                                                                          TOTAL FAMILY HOUSING...    1,940,751       27,000    1,967,751
DEFENSE BASE REALIGNMENT AND CLOSURE
BASE REALIGNMENT AND CLOSURE, ARMY
  BRAC, Army.........................  Worldwide Unspecified     BASE REALIGNMENT AND     150,640................            0      150,640
                                        Unspecified Worldwide     CLOSURE.
                                        Locations.
                                                                                         --------------------------
                                                                                          Subtotal Base                150,640            0      150,640
                                                                                           Realignment and
                                                                                           Closure--Army.
BASE REALIGNMENT AND CLOSURE, NAVY
  BRAC, Navy.........................  Worldwide Unspecified...  Unspecified Worldwide    BASE REALIGNMENT AND         108,818            0      108,818
                                                                  Locations.               CLOSURE.
                                                                                         --------------------------
                                                                                          Subtotal Base                108,818            0      108,818
                                                                                           Realignment and
                                                                                           Closure--Navy.
BASE REALIGNMENT AND CLOSURE, AIR
 FORCE
  BRAC, Air Force....................  Worldwide Unspecified...  Unspecified Worldwide    BASE REALIGNMENT AND         123,990            0
                                                                  Locations.               CLOSURE.
                                                                                         --------------------------
                                                                                          Subtotal Base                123,990            0      123,990
                                                                                           Realignment and
                                                                                           Closure--Air Force.
BASE REALIGNMENT AND CLOSURE, DEFENSE-
 WIDE
  BRAC, Defense-Wide.................  Worldwide Unspecified...  Unspecified Worldwide    INT-4: DLA ACTIVITIES..        5,726            0        5,726
                                                                  Locations.
                                                                                         --------------------------
                                                                                          Subtotal Base                  5,726            0        5,726
                                                                                           Realignment and
                                                                                           Closure--Defense-Wide.
                                                                                          TOTAL DEFENSE BASE           389,174            0      389,174
                                                                                           REALIGNMENT AND
                                                                                           CLOSURE.
                                                                                          TOTAL MILITARY            16,674,944    2,386,215   19,061,159
                                                                                           CONSTRUCTION, FAMILY
                                                                                           HOUSING, AND BRAC.
--------------------------------------------------------------------------------------------------------------------------------------------------------

                 TITLE XXI--ARMY MILITARY CONSTRUCTION

     SEC. 2101. AUTHORIZED ARMY CONSTRUCTION AND LAND ACQUISITION 
                   PROJECTS.

       (a) Inside the United States.--Using amounts appropriated 
     pursuant to the authorization of appropriations in section 
     2103(a) and available for military construction projects 
     inside the United States as specified in the funding table in 
     section 4601, the Secretary of the Army may acquire real 
     property and carry out military construction projects for the 
     installations or locations inside the United States, and in 
     the amounts, set forth in the following table:

                                         Army: Inside the United States
----------------------------------------------------------------------------------------------------------------
                     State                                  Installation or Location                  Amount
----------------------------------------------------------------------------------------------------------------
Alabama........................................  Redstone Arsenal..............................      $50,000,000
Florida........................................  Eglin Air Force Base..........................      $75,000,000
Georgia........................................  Fort Eisenhower...............................     $163,000,000
Hawaii.........................................  Aliamanu Military Reservation.................      $20,000,000
                                                 Fort Shafter..................................      $23,000,000
                                                 Helemano Military Reservation.................      $33,000,000
                                                 Schofield Barracks............................      $37,000,000
Illinois.......................................  Rock Island Arsenal...........................      $44,000,000
Kansas.........................................  Fort Riley....................................     $105,000,000
Kentucky.......................................  Fort Campbell.................................      $38,000,000
Louisiana......................................  Fort Johnson..................................     $119,400,000
Maryland.......................................  Fort Meade....................................      $50,000,000
Massachusetts..................................  Soldier Systems Center Natick.................      $18,500,000
Michigan.......................................  Detroit Arsenal...............................      $72,000,000
New York.......................................  Fort Hamilton.................................      $25,000,000
North Carolina.................................  Fort Liberty..................................     $193,500,000
Pennsylvania...................................  Letterkenny Army Depot........................      $89,000,000

[[Page S3653]]

 
South Carolina.................................  Fort Jackson..................................      $41,000,000
Texas..........................................  Fort Bliss....................................      $74,000,000
                                                 Red River Army Depot..........................     $113,000,000
Virginia.......................................  Fort Belvoir..................................      $40,000,000
                                                 Joint Base Myer - Henderson Hall..............     $177,000,000
Washington.....................................  Joint Base Lewis - McChord....................     $100,000,000
----------------------------------------------------------------------------------------------------------------

       (b) Outside the United States.--Using amounts appropriated 
     pursuant to the authorization of appropriations in section 
     2103(a) and available for military construction projects 
     outside the United States as specified in the funding table 
     in section 4601, the Secretary of the Army may acquire real 
     property and carry out military construction projects for the 
     installations or locations outside the United States, and in 
     the amounts, set forth in the following table:

                                         Army: Outside the United States
----------------------------------------------------------------------------------------------------------------
                    Country                                 Installation or Location                  Amount
----------------------------------------------------------------------------------------------------------------
Germany........................................  Grafenwoehr...................................      $10,400,000
                                                 Hohenfels.....................................      $56,000,000
                                                 Pulaski Barracks..............................      $25,000,000
----------------------------------------------------------------------------------------------------------------

       (c) Prototype Project.--Using amounts appropriated pursuant 
     to the authorization of appropriations in section 2103(a) and 
     available for military construction projects as specified in 
     the funding table in section 4601, the Secretary of the Army 
     may carry out a military construction project for the 
     installation, and in the amount, set forth in the following 
     table as a prototype project under the pilot program under 
     section 4022(i) of title 10, United States Code, 
     notwithstanding subchapters I and III of chapter 169 and 
     chapters 221 and 223 of title 10, United States Code:

                                             Army Prototype Project
----------------------------------------------------------------------------------------------------------------
                     State                                        Installation                        Amount
----------------------------------------------------------------------------------------------------------------
North Carolina.................................  Fort Liberty..................................      $85,000,000
----------------------------------------------------------------------------------------------------------------

     SEC. 2102. FAMILY HOUSING.

       (a) Construction and Acquisition.--Using amounts 
     appropriated pursuant to the authorization of appropriations 
     in section 2103(a) and available for military family housing 
     functions as specified in the funding table in section 4601, 
     the Secretary of the Army may construct or acquire family 
     housing units (including land acquisition and supporting 
     facilities) at the installations or locations, in the number 
     of units, and in the amounts set forth in the following 
     table:

                                              Army: Family Housing
----------------------------------------------------------------------------------------------------------------
                Country                    Installation or Location             Units                 Amount
----------------------------------------------------------------------------------------------------------------
Germany................................  Baumholder.................  Family Housing New             $78,746,000
                                                                       Construction............
Kwajalein..............................  Kwajalein Atoll............  Family Housing                 $98,600,000
                                                                       Replacement Construction
----------------------------------------------------------------------------------------------------------------

       (b) Improvements to Military Family Housing Units.--Subject 
     to section 2825 of title 10, United States Code, and using 
     amounts appropriated pursuant to the authorization of 
     appropriations in section 2103(a) and available for military 
     family housing functions as specified in the funding table in 
     section 4601, the Secretary of the Army may improve existing 
     military family housing units in an amount not to exceed 
     $100,000,000.
       (c) Planning and Design.--Using amounts appropriated 
     pursuant to the authorization of appropriations in section 
     2103(a) and available for military family housing functions 
     as specified in the funding table in section 4601, the 
     Secretary of the Army may carry out architectural and 
     engineering services and construction design activities with 
     respect to the construction or improvement of family housing 
     units in an amount not to exceed $27,549,000.

     SEC. 2103. AUTHORIZATION OF APPROPRIATIONS, ARMY.

       (a) Authorization of Appropriations.--Funds are hereby 
     authorized to be appropriated for fiscal years beginning 
     after September 30, 2023, for military construction, land 
     acquisition, and military family housing functions of the 
     Department of the Army as specified in the funding table in 
     section 4601.
       (b) Limitation on Total Cost of Construction Projects.--
     Notwithstanding the cost variations authorized by section 
     2853 of title 10, United States Code, and any other cost 
     variation authorized by law, the total cost of all projects 
     carried out under section 2101 of this Act may not exceed the 
     total amount authorized to be appropriated under subsection 
     (a), as specified in the funding table in section 4601.

     SEC. 2104. EXTENSION OF AUTHORITY TO USE CASH PAYMENTS IN 
                   SPECIAL ACCOUNT FROM LAND CONVEYANCE, NATICK 
                   SOLDIER SYSTEMS CENTER, MASSACHUSETTS.

       Section 2844(c)(2)(C) of the Military Construction 
     Authorization Act for Fiscal Year 2018 (division B of Public 
     Law 115-91; 131 Stat. 1865) is amended by striking ``October 
     1, 2025'' and inserting ``October 1, 2027''.

     SEC. 2105. EXTENSION OF AUTHORITY TO CARRY OUT FISCAL YEAR 
                   2018 PROJECT AT KUNSAN AIR BASE, KOREA.

       (a) Extension.--Notwithstanding section 2002 of the 
     Military Construction Authorization Act for Fiscal Year 2018 
     (division B of Public Law 115-91; 131 Stat. 1817), the 
     authorization set forth in the table in subsection (b), as 
     provided in section 2101(b) of that Act (131 Stat. 1819) and 
     extended and modified by subsections (a) and (b) of section 
     2106 of the Military Construction Act for Fiscal Year 2023 
     (division B of Public Law 117-263), shall remain in effect 
     until October 1, 2024, or the date of the enactment of an Act 
     authorizing funds for military construction for fiscal year 
     2025, whichever is later.
       (b) Table.--The table referred to in subsection (a) is as 
     follows:

[[Page S3654]]



                                  Army: Extension of 2018 Project Authorization
----------------------------------------------------------------------------------------------------------------
                                                                                                    Original
                Country                  Installation or Location            Project           Authorized Amount
----------------------------------------------------------------------------------------------------------------
Korea.................................  Kunsan Air Base...........  Unmanned Aerial Vehicle          $53,000,000
                                                                     Hangar..................
----------------------------------------------------------------------------------------------------------------

     SEC. 2106. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL 
                   YEAR 2019 PROJECTS.

       (a) Army Construction and Land Acquisition.--
       (1) Extension.--Notwithstanding section 2002 of the 
     Military Construction Authorization Act for Fiscal Year 2019 
     (division B of Public Law 115-232; 132 Stat. 2240), the 
     authorizations set forth in the table in paragraph (2), as 
     provided in section 2101 of that Act (132 Stat. 2241), shall 
     remain in effect until October 1, 2024, or the date of the 
     enactment of an Act authorizing funds for military 
     construction for fiscal year 2025, whichever is later.
       (2) Table.--The table referred to in paragraph (1) is as 
     follows:

                                 Army: Extension of 2019 Project Authorizations
----------------------------------------------------------------------------------------------------------------
                                                                                                    Original
             State/Country               Installation or Location            Project           Authorized Amount
----------------------------------------------------------------------------------------------------------------
Korea.................................  Camp Tango................  Command and Control              $17,500,000
                                                                     Facility................
Maryland..............................  Fort Meade................  Cantonment Area Roads....        $16,500,000
----------------------------------------------------------------------------------------------------------------

       (b) Overseas Contingency Operations.--
       (1) Extension.--Notwithstanding section 2002 of the 
     Military Construction Authorization Act for Fiscal Year 2019 
     (division B of Public Law 115-232; 132 Stat. 2240), the 
     authorizations set forth in the table in paragraph (2), as 
     provided in section 2901 of that Act (132 Stat. 2286), shall 
     remain in effect until October 1, 2024, or the date of the 
     enactment of an Act authorizing funds for military 
     construction for fiscal year 2025, whichever is later.
       (2) Table.--The table referred to in paragraph (1) is as 
     follows:

                                 Army: Extension of 2019 Project Authorizations
----------------------------------------------------------------------------------------------------------------
                                                                                                    Original
                Country                  Installation or Location            Project           Authorized Amount
----------------------------------------------------------------------------------------------------------------
Bulgaria..............................  Nevo Selo FOS.............  EDI: Ammunition Holding           $5,200,000
                                                                     Area....................
Romania...............................  Mihail Kogalniceanu FOS...  EDI: Explosives & Ammo           $21,651,000
                                                                     Load/Unload Apron.......
----------------------------------------------------------------------------------------------------------------

     SEC. 2107. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL 
                   YEAR 2021 PROJECTS.

       (a) Army Construction and Land Acquisition.--
       (1) Extension.--Notwithstanding section 2002 of the 
     Military Construction Authorization Act for Fiscal Year 2021 
     (division B of Public Law 116-283; 134 Stat. 4294), the 
     authorizations set forth in the table in paragraph (2), as 
     provided in section 2101(a) of that Act (134 Stat. 4295), 
     shall remain in effect until October 1, 2024, or the date of 
     the enactment of an Act authorizing funds for military 
     construction for fiscal year 2025, whichever is later.
       (2) Table.--The table referred to in paragraph (1) is as 
     follows:

                                 Army: Extension of 2021 Project Authorizations
----------------------------------------------------------------------------------------------------------------
                                                                                                    Original
                 State                   Installation or Location            Project           Authorized Amount
----------------------------------------------------------------------------------------------------------------
Arizona...............................  Yuma Proving Ground.......  Ready Building...........        $14,000,000
Georgia...............................  Fort Gillem...............  Forensic Lab.............        $71,000,000
Louisiana.............................  Fort Johnson..............  Information Systems              $25,000,000
                                                                     Facility................
----------------------------------------------------------------------------------------------------------------

       (b) Child Development Center, Georgia.--
       (1) Extension.--Notwithstanding section 2002 of the 
     Military Construction Authorization Act for Fiscal Year 2021 
     (division B of Public Law 116-283; 134 Stat. 4294), the 
     authorization under section 2865 of that Act (10 U.S.C. 2802 
     note) for the project described in paragraph (2) in Fort 
     Eisenhower, Georgia, shall remain in effect until October 1, 
     2024, or the date of the enactment of an Act authorizing 
     funds for military construction for fiscal year 2025, 
     whichever is later.
       (2) Project described.--The project described in this 
     paragraph is the following:

                                  Army: Extension of 2021 Project Authorization
----------------------------------------------------------------------------------------------------------------
                                                                                                    Original
                 State                   Installation or Location            Project           Authorized Amount
----------------------------------------------------------------------------------------------------------------
Georgia...............................  Fort Eisenhower...........  Child Development Center.        $21,000,000
----------------------------------------------------------------------------------------------------------------

                 TITLE XXII--NAVY MILITARY CONSTRUCTION

     SEC. 2201. AUTHORIZED NAVY CONSTRUCTION AND LAND ACQUISITION 
                   PROJECTS.

       (a) Inside the United States.--Using amounts appropriated 
     pursuant to the authorization of appropriations in section 
     2203(a) and available for military construction projects 
     inside the United States as specified in the funding table in 
     section 4601, the Secretary of the Navy may acquire real 
     property and carry out military construction projects for the 
     installations or locations inside the United States, and in 
     the amounts, set forth in the following table:

[[Page S3655]]



                                         Navy: Inside the United States
----------------------------------------------------------------------------------------------------------------
                    State                                  Installation or Location                   Amount
----------------------------------------------------------------------------------------------------------------
California..................................  Marine Corps Air Ground Combat Center Twentynine       $42,100,000
                                               Palms...........................................
                                              Marine Corps Base Camp Pendleton.................      $26,825,000
                                              Port Hueneme.....................................     $110,000,000
Connecticut.................................  Naval Submarine Base New London..................     $331,718,000
District of Columbia........................  Marine Barracks Washington.......................     $131,800,000
Florida.....................................  Naval Air Station Whiting Field..................     $141,500,000
Georgia.....................................  Marine Corps Logistics Base Albany...............      $63,970,000
Guam........................................  Andersen Air Force Base..........................     $497,620,000
                                              Joint Region Marianas............................     $174,540,000
                                              Naval Base Guam..................................     $946,500,000
Hawaii......................................  Marine Corps Base Kaneohe Bay....................     $227,350,000
Maryland....................................  Fort Meade.......................................     $186,480,000
                                              Naval Air Station Patuxent River.................     $141,700,000
North Carolina..............................  Marine Corps Air Station Cherry Point............     $270,150,000
                                              Marine Corps Base Camp Lejeune...................     $215,670,000
Pennsylvania................................  Naval Surface Warfare Center Philadelphia........      $88,200,000
Virginia....................................  Dam Neck Annex...................................     $109,680,000
                                              Joint Expeditionary Base Little Creek - Fort           $35,000,000
                                               Story.
                                              Marine Corps Base Quantico.......................     $127,120,000
                                              Naval Station Norfolk............................     $158,095,000
                                              Naval Weapons Station Yorktown...................     $221,920,000
Washington..................................  Naval Base Kitsap................................     $245,000,000
----------------------------------------------------------------------------------------------------------------

       (b) Outside the United States.--Using amounts appropriated 
     pursuant to the authorization of appropriations in section 
     2203(a) and available for military construction projects 
     outside the United States as specified in the funding table 
     in section 4601, the Secretary of the Navy may acquire real 
     property and carry out military construction projects for the 
     installations or locations outside the United States, and in 
     the amounts, set forth in the following table:

                                         Navy: Outside the United States
----------------------------------------------------------------------------------------------------------------
                   Country                                 Installation or Location                   Amount
----------------------------------------------------------------------------------------------------------------
Djibouti....................................  Camp Lemonnier...................................     $106,600,000
Italy.......................................  Naval Air Station Sigonella......................      $77,072,000
----------------------------------------------------------------------------------------------------------------

       (c) Prototype Project.--Using amounts appropriated pursuant 
     to the authorization of appropriations in section 2203(a) and 
     available for military construction projects as specified in 
     the funding table in section 4601, the Secretary of the Navy 
     may carry out a military construction project for the 
     installation, and in the amount, set forth in the following 
     table as a prototype project under the pilot program under 
     section 4022(i) of title 10, United States Code, 
     notwithstanding subchapters I and III of chapter 169 and 
     chapters 221 and 223 of title 10, United States Code:

                                             Navy Prototype Project
----------------------------------------------------------------------------------------------------------------
                    State                                        Installation                         Amount
----------------------------------------------------------------------------------------------------------------
Virginia....................................  Joint Expeditionary Base Little Creek - Fort           $35,000,000
                                               Story...........................................
----------------------------------------------------------------------------------------------------------------

     SEC. 2202. FAMILY HOUSING.

       (a) Construction and Acquisition.--Using amounts 
     appropriated pursuant to the authorization of appropriations 
     in section 2203(a) and available for military family housing 
     functions as specified in the funding table in section 4601, 
     the Secretary of the Navy may construct or acquire family 
     housing units (including land acquisition and supporting 
     facilities) at the installations or locations, in the number 
     of units, and in the amounts set forth in the following 
     table:

                                              Navy: Family Housing
----------------------------------------------------------------------------------------------------------------
                                           Installation or
               Country                         Location                  Units                    Amount
----------------------------------------------------------------------------------------------------------------
Guam.................................  Joint Region Marianas..  Replace Andersen         $121,906,000
                                                                 Housing Ph 8..........
                                       Mariana Islands........  Replace Andersen         $83,126,000
                                                                 Housing (AF) PH7.
----------------------------------------------------------------------------------------------------------------

       (b) Improvements to Military Family Housing Units.--Subject 
     to section 2825 of title 10, United States Code, and using 
     amounts appropriated pursuant to the authorization of 
     appropriations in section 2203(a) and available for military 
     family housing functions as specified in the funding table in 
     section 4601, the Secretary of the Navy may improve existing 
     military family housing units in an amount not to exceed 
     $57,740,000.
       (c) Planning and Design.--Using amounts appropriated 
     pursuant to the authorization of appropriations in section 
     2203(a) and available for military family housing functions 
     as specified in the funding table in section 4601, the 
     Secretary of the Navy may carry out architectural and 
     engineering services and construction design activities with 
     respect to the construction or improvement of family housing 
     units in an amount not to exceed $14,370,000.

     SEC. 2203. AUTHORIZATION OF APPROPRIATIONS, NAVY.

       (a) Authorization of Appropriations.--Funds are hereby 
     authorized to be appropriated for fiscal years beginning 
     after September 30, 2023, for military construction, land 
     acquisition, and military family housing functions of the 
     Department of the Navy, as specified in the funding table in 
     section 4601.
       (b) Limitation on Total Cost of Construction Projects.--
     Notwithstanding the cost variations authorized by section 
     2853 of title 10, United States Code, and any other cost 
     variation authorized by law, the total cost of all projects 
     carried out under section 2201 of this Act may not exceed the 
     total amount authorized to be appropriated under subsection 
     (a), as specified in the funding table in section 4601.

     SEC. 2204. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL 
                   YEAR 2019 PROJECTS.

       (a) Navy Construction and Land Acquisition Projects.--
       (1) Extension.--Notwithstanding section 2002 of the 
     Military Construction Authorization Act for Fiscal Year 2019 
     (division B of Public Law 115-232; 132 Stat. 2240), the 
     authorizations set forth in the table in paragraph (2), as 
     provided in section 2201 of that Act (132 Stat. 2243), shall 
     remain in effect

[[Page S3656]]

     until October 1, 2024, or the date of the enactment of an Act 
     authorizing funds for military construction for fiscal year 
     2025, whichever is later.
       (2) Table.--The table referred to in paragraph (1) is as 
     follows:

                                 Navy: Extension of 2019 Project Authorizations
----------------------------------------------------------------------------------------------------------------
                                           Installation or                                 Original Authorized
            State/Country                      Location                 Project                   Amount
----------------------------------------------------------------------------------------------------------------
Bahrain..............................  SW Asia................  Fleet Maintenance        $26,340,000
                                                                 Facility & TOC.
North Carolina.......................  Marine Corps Base Camp   2nd Radio BN Complex,    $51,300,000
                                        Lejeune.                 Phase 2.
South Carolina.......................  Marine Corps Air         Recycling/Hazardous      $9,517,000
                                        Station Beaufort.        Waste Facility.
Washington...........................  Bangor.................  Pier and Maintenance     $88,960,000
                                                                 Facility.
----------------------------------------------------------------------------------------------------------------

       (b) Laurel Bay Fire Station, South Carolina.--
       (1) Extension.--Notwithstanding section 2002 of the 
     Military Construction Authorization Act for Fiscal Year 2019 
     (division B of Public Law 115-232; 132 Stat. 2240), the 
     authorization under section 2810 of that Act (132 Stat. 2266) 
     for the project described in paragraph (2) shall remain in 
     effect until October 1, 2024, or the date of the enactment of 
     an Act authorizing funds for military construction for fiscal 
     year 2025, whichever is later.
       (2) Project described.--The project described in this 
     paragraph is the following::

                                  Navy: Extension of 2019 Project Authorization
----------------------------------------------------------------------------------------------------------------
                                           Installation or                                 Original Authorized
                State                          Location                 Project                   Amount
----------------------------------------------------------------------------------------------------------------
South Carolina.......................  Marine Corps Air         Laurel Bay Fire Station  $10,750,000
                                        Station Beaufort.
----------------------------------------------------------------------------------------------------------------

       (c) Overseas Contingency Operations.--
       (1) Extension.--Notwithstanding section 2002 of the 
     Military Construction Authorization Act for Fiscal Year 2019 
     (division B of Public Law 115-232; 132 Stat. 2240), the 
     authorization set forth in the table in paragraph (2), as 
     provided in section 2902 of that Act (132 Stat. 2286), shall 
     remain in effect until October 1, 2024, or the date of the 
     enactment of an Act authorizing funds for military 
     construction for fiscal year 2025, whichever is later.
       (2) Table.--The table referred to in paragraph (1) is as 
     follows:

                                 Navy: Extension of 2019 Project Authorizations
----------------------------------------------------------------------------------------------------------------
                                           Installation or                                 Original Authorized
               Country                         Location                 Project                   Amount
----------------------------------------------------------------------------------------------------------------
Greece...............................  Naval Support Activity   EDI: Joint Mobility      $41,650,000
                                        Souda Bay.               Processing Center.
----------------------------------------------------------------------------------------------------------------

     SEC. 2205. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL 
                   YEAR 2021 PROJECTS.

       (a) Extension.--Notwithstanding section 2002 of the 
     Military Construction Authorization Act for Fiscal Year 2021 
     (division B of Public Law 116-283; 134 Stat. 4294), the 
     authorizations set forth in the table in subsection (b), as 
     provided in section 2201 of that Act (134 Stat. 4297), shall 
     remain in effect until October 1, 2024, or the date of the 
     enactment of an Act authorizing funds for military 
     construction for fiscal year 2025, whichever is later.
       (b) Table.--The table referred to in subsection (a) is as 
     follows:

                                 Navy: Extension of 2021 Project Authorizations
----------------------------------------------------------------------------------------------------------------
                                           Installation or                                 Original Authorized
            State/Country                      Location                 Project                   Amount
----------------------------------------------------------------------------------------------------------------
California...........................  Twentynine Palms.......  Wastewater Treatment     $76,500,000
                                                                 Plant.
Guam.................................  Joint Region Marianas..  Joint Communication      $166,000,000
                                                                 Upgrade.
Maine................................  NCTAMS LANT Detachment   Perimeter Security.....  $26,100,000
                                        Cutler.
Nevada...............................  Fallon.................  Range Training Complex,  $29,040,000
                                                                 Phase I.
----------------------------------------------------------------------------------------------------------------

              TITLE XXIII--AIR FORCE MILITARY CONSTRUCTION

     SEC. 2301. AUTHORIZED AIR FORCE CONSTRUCTION AND LAND 
                   ACQUISITION PROJECTS.

       (a) Inside the United States.--Using amounts appropriated 
     pursuant to the authorization of appropriations in section 
     2303(a) and available for military construction projects 
     inside the United States as specified in the funding table in 
     section 4601, the Secretary of the Air Force may acquire real 
     property and carry out military construction projects for the 
     installations or locations inside the United States, and in 
     the amounts, set forth in the following table:

                                       Air Force: Inside the United States
----------------------------------------------------------------------------------------------------------------
                     State                                  Installation or Location                  Amount
----------------------------------------------------------------------------------------------------------------
District of Columbia..........................  Joint Base Anacostia - Bolling..................     $50,000,000
Florida.......................................  MacDill Air Force Base..........................    $131,000,000
                                                Patrick Space Force Base........................     $27,000,000
                                                Tyndall Air Force Base..........................    $252,000,000
Georgia.......................................  Robins Air Force Base...........................    $115,000,000
Guam..........................................  Joint Region Marianas...........................    $411,000,000
Massachusetts.................................  Hanscom Air Force Base..........................     $37,000,000
Mississippi...................................  Columbus Air Force Base.........................     $39,500,000
Montana.......................................  Malmstrom Air Force Base........................     $10,300,000
South Dakota..................................  Ellsworth Air Force Base........................    $235,000,000

[[Page S3657]]

 
Texas.........................................  Joint Base San Antonio - Lackland...............    $314,000,000
Utah..........................................  Hill Air Force Base.............................    $488,000,000
Wyoming.......................................  F.E. Warren Air Force Base......................     $85,000,000
----------------------------------------------------------------------------------------------------------------

       (b) Outside the United States.--Using amounts appropriated 
     pursuant to the authorization of appropriations in section 
     2303(a) and available for military construction projects 
     outside the United States as specified in the funding table 
     in section 4601, the Secretary of the Air Force may acquire 
     real property and carry out military construction projects 
     for the installations or locations outside the United States, 
     and in the amounts, set forth in the following table:

                                      Air Force: Outside the United States
----------------------------------------------------------------------------------------------------------------
                    Country                                 Installation or Location                  Amount
----------------------------------------------------------------------------------------------------------------
Australia.....................................  Royal Australian Air Force Base Darwin..........     $26,000,000
                                                Royal Australian Air Force Base Tindal..........    $130,500,000
Norway........................................  Rygge Air Station...............................    $119,000,000
Philippines...................................  Cesar Basa Air Base.............................     $35,000,000
Spain.........................................  Moron Air Base..................................     $26,000,000
United Kingdom................................  Royal Air Force Fairford........................     $47,000,000
                                                Royal Air Force Lakenheath......................     $78,000,000
----------------------------------------------------------------------------------------------------------------

       (c) Prototype Project.--Using amounts appropriated pursuant 
     to the authorization of appropriations in section 2303(a) and 
     available for military construction projects as specified in 
     the funding table in section 4601, the Secretary of the Air 
     Force may carry out a military construction project for the 
     installation, and in the amount, set forth in the following 
     table as a prototype project under the pilot program under 
     section 4022(i) of title 10, United States Code, 
     notwithstanding subchapters I and III of chapter 169 and 
     chapters 221 and 223 of title 10, United States Code:

                                           Air Force Prototype Project
----------------------------------------------------------------------------------------------------------------
                     State                                        Installation                        Amount
----------------------------------------------------------------------------------------------------------------
Massachusetts.................................  Hanscom Air Force Base..........................     $37,000,000
----------------------------------------------------------------------------------------------------------------

     SEC. 2302. FAMILY HOUSING.

       (a) Improvements to Military Family Housing Units.--Subject 
     to section 2825 of title 10, United States Code, and using 
     amounts appropriated pursuant to the authorization of 
     appropriations in section 2303(a) and available for military 
     family housing functions as specified in the funding table in 
     section 4601, the Secretary of the Air Force may improve 
     existing military family housing units in an amount not to 
     exceed $249,928,200.
       (b) Planning and Design.--Using amounts appropriated 
     pursuant to the authorization of appropriations in section 
     2303(a) and available for military family housing functions 
     as specified in the funding table in section 4601, the 
     Secretary of the Air Force may carry out architectural and 
     engineering services and construction design activities with 
     respect to the construction or improvement of family housing 
     units in an amount not to exceed $7,815,000.
       (c) Construction and Acquisition.--Using amounts 
     appropriated pursuant to the authorization of appropriations 
     in section 2303(a) and available for military family housing 
     functions as specified in the funding table in section 4601, 
     the Secretary of the Air Force may construct or acquire 
     family housing units (including land acquisition and 
     supporting facilities) at the installation and in the amount 
     set forth in the following table:

                                            Air Force: Family Housing
----------------------------------------------------------------------------------------------------------------
                    Country                                       Installation                        Amount
----------------------------------------------------------------------------------------------------------------
Japan.........................................  Yokota Air Base.................................     $27,000,000
----------------------------------------------------------------------------------------------------------------

     SEC. 2303. AUTHORIZATION OF APPROPRIATIONS, AIR FORCE.

       (a) Authorization of Appropriations.--Funds are hereby 
     authorized to be appropriated for fiscal years beginning 
     after September 30, 2023, for military construction, land 
     acquisition, and military family housing functions of the 
     Department of the Air Force, as specified in the funding 
     table in section 4601.
       (b) Limitation on Total Cost of Construction Projects.--
     Notwithstanding the cost variations authorized by section 
     2853 of title 10, United States Code, and any other cost 
     variation authorized by law, the total cost of all projects 
     carried out under section 2301 of this Act may not exceed the 
     total amount authorized to be appropriated under subsection 
     (a), as specified in the funding table in section 4601.

     SEC. 2304. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL 
                   YEAR 2017 PROJECTS.

       (a) Air Force Construction and Land Acquisition Projects.--
       (1) Extension.--Notwithstanding section 2002 of the 
     Military Construction Authorization Act for Fiscal Year 2017 
     (division B of Public Law 114-328; 130 Stat. 2688), the 
     authorizations set forth in the table in paragraph (2), as 
     provided in section 2301(b) of that Act (130 Stat. 2697) and 
     extended by section 2304 of the Military Construction 
     Authorization Act for Fiscal Year 2022 (division B of Public 
     Law 117-181; 135 Stat. 2169), shall remain in effect until 
     October 1, 2024, or the date of the enactment of an Act 
     authorizing funds for military construction for fiscal year 
     2025, whichever is later.
       (2) Table.--The table referred to in paragraph (1) is as 
     follows:

                               Air Force: Extension of 2017 Project Authorizations
----------------------------------------------------------------------------------------------------------------
                                                                                                    Original
                Country                  Installation or Location            Project               Authorized
                                                                                                     Amount
----------------------------------------------------------------------------------------------------------------
Germany...............................  Ramstein Air Base.........  37 AS Squadron Operations/       $13,437,000
                                                                     Aircraft Maintenance
                                                                     Unit....................
                                        Spangdahlem Air Base......  Upgrade Hardened Aircraft         $2,700,000
                                                                     Shelters for F/A-22.....
Japan.................................  Yokota Air Force Base.....  C-130J Corrosion Control         $23,777,000
                                                                     Hangar..................
----------------------------------------------------------------------------------------------------------------


[[Page S3658]]

       (b) Overseas Contingency Operations.--
       (1) Extension.--Notwithstanding section 2002 of the 
     Military Construction Authorization Act for Fiscal Year 2017 
     (division B of Public Law 114-328; 130 Stat. 2688), the 
     authorization set forth in the table in paragraph (2), as 
     provided in section 2902 of that Act (130 Stat. 2743) and 
     extended by section 2304 of the Military Construction 
     Authorization Act for Fiscal Year 2022 (division B of Public 
     Law 117-181; 135 Stat. 2169), shall remain in effect until 
     October 1, 2024, or the date of the enactment of an Act 
     authorizing funds for military construction for fiscal year 
     2025, whichever is later.
       (2) Table.--The table referred to in paragraph (1) is as 
     follows:

                               Air Force: Extension of 2017 Project Authorizations
----------------------------------------------------------------------------------------------------------------
                                                                                                    Original
                Country                  Installation or Location            Project               Authorized
                                                                                                     Amount
----------------------------------------------------------------------------------------------------------------
Germany...............................  Spangdahlem Air Base......  F/A-22 Low Observable/           $12,000,000
                                                                     Composite Repair
                                                                     Facility................
----------------------------------------------------------------------------------------------------------------

     SEC. 2305. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL 
                   YEAR 2018 PROJECTS.

       (a) Air Force Construction and Land Acquisition Projects.--
       (1) Extension.--Notwithstanding section 2002 of the 
     Military Construction Authorization Act for Fiscal Year 2018 
     (division B of Public Law 115-91; 131 Stat. 1817), the 
     authorization set forth in the table in paragraph (2), as 
     provided in section 2301(a) of that Act (131 Stat. 1825) and 
     extended by section 2304(a) of the Military Construction 
     Authorization Act for Fiscal Year 2023 (division B of Public 
     Law 117-263), shall remain in effect until October 1, 2024, 
     or the date of the enactment of an Act authorizing funds for 
     military construction for fiscal year 2025, whichever is 
     later.
       (2) Table.--The table referred to in paragraph (1) is as 
     follows:

                               Air Force: Extension of 2018 Project Authorizations
----------------------------------------------------------------------------------------------------------------
                                                                                                    Original
                 State                   Installation or Location            Project               Authorized
                                                                                                     Amount
----------------------------------------------------------------------------------------------------------------
Florida...............................  Tyndall Air Force Base....  Fire Station.............        $17,000,000
----------------------------------------------------------------------------------------------------------------

       (b) Overseas Contingency Operations.--
       (1) Extension.--Notwithstanding section 2002 of the 
     Military Construction Authorization Act for Fiscal Year 2018 
     (division B of Public Law 115-91; 131 Stat. 1817), the 
     authorizations set forth in the table in paragraph (2), as 
     provided in section 2903 of that Act (131 Stat. 1876) and 
     extended by section 2304(b) of the Military Construction 
     Authorization Act for Fiscal Year 2023 (division B of Public 
     Law 117-263), shall remain in effect until October 1, 2024, 
     or the date of the enactment of an Act authorizing funds for 
     military construction for fiscal year 2025, whichever is 
     later.
       (2) Table.--The table referred to in paragraph (1) is as 
     follows:

                               Air Force: Extension of 2018 Project Authorizations
----------------------------------------------------------------------------------------------------------------
                                                                                                    Original
                Country                  Installation or Location            Project               Authorized
                                                                                                     Amount
----------------------------------------------------------------------------------------------------------------
Hungary...............................  Kecskemet Air Base........  ERI: Airfield Upgrades...        $12,900,000
                                        Kecskemet Air Base........  ERI: Construct Parallel          $30,000,000
                                                                     Taxiway.................
                                        Kecskemet Air Base........  ERI: Increase POL Storage        $12,500,000
                                                                     Capacity................
Luxembourg............................  Sanem.....................  ERI: ECAOS Deployable            $67,400,000
                                                                     Airbase System Storage..
Slovakia..............................  Malacky...................  ERI: Airfield Upgrades...         $4,000,000
                                        Malacky...................  ERI: Increase POL Storage        $20,000,000
                                                                     Capacity................
----------------------------------------------------------------------------------------------------------------

     SEC. 2306. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL 
                   YEAR 2019 PROJECTS.

       (a) Air Force Construction and Land Acquisition Projects.--
       (1) Extension.--Notwithstanding section 2002 of the 
     Military Construction Authorization Act for Fiscal Year 2019 
     (division B of Public Law 115-232; 132 Stat. 2240), the 
     authorizations set forth in the table in paragraph (2), as 
     provided in section 2301 of that Act (132 Stat. 2246), shall 
     remain in effect until October 1, 2024, or the date of the 
     enactment of an Act authorizing funds for military 
     construction for fiscal year 2025, whichever is later.
       (2) Table.--The table referred to in paragraph (1) is as 
     follows:

                               Air Force: Extension of 2019 Project Authorizations
----------------------------------------------------------------------------------------------------------------
                                                                                                    Original
             State/Country               Installation or Location            Project               Authorized
                                                                                                     Amount
----------------------------------------------------------------------------------------------------------------
Mariana Islands.......................  Tinian....................  APR-Cargo Pad with               $46,000,000
                                                                     Taxiway Extension.......
                                        Tinian....................  APR-Maintenance Support           $4,700,000
                                                                     Facility................
Maryland..............................  Joint Base Andrews........  Child Development Center.        $13,000,000
                                        Joint Base Andrews........  PAR Relocate Haz Cargo           $37,000,000
                                                                     Pad and EOD Range.......
New Mexico............................  Holloman Air Force Base...  MQ-9 FTU Ops Facility....        $85,000,000
                                        Kirtland Air Force Base...  Wyoming Gate Upgrade for          $7,000,000
                                                                     Anti-Terrorism
                                                                     Compliance..............
United Kingdom........................  Royal Air Force Lakenheath  F-35 ADAL Conventional            $9,204,000
                                                                     Munitions MX............
Utah..................................  Hill Air Force Base.......  Composite Aircraft               $26,000,000
                                                                     Antenna Calibration Fac.
----------------------------------------------------------------------------------------------------------------

       (b) Overseas Contingency Operations.--
       (1) Extension.--Notwithstanding section 2002 of the 
     Military Construction Authorization Act for Fiscal Year 2019 
     (division B of Public Law 115-232; 132 Stat. 2240), the 
     authorizations set forth in the table in paragraph (2), as 
     provided in section 2903 of that Act (132 Stat. 2287), shall 
     remain in effect

[[Page S3659]]

     until October 1, 2024, or the date of the enactment of an Act 
     authorizing funds for military construction for fiscal year 
     2025, whichever is later.
       (2) Table.--The table referred to in paragraph (1) is as 
     follows:

                               Air Force: Extension of 2019 Project Authorizations
----------------------------------------------------------------------------------------------------------------
                                                                                                    Original
                Country                  Installation or Location            Project               Authorized
                                                                                                     Amount
----------------------------------------------------------------------------------------------------------------
Slovakia..............................  Malacky...................  EDI: Regional Munitions          $59,000,000
                                                                     Storage Area............
United Kingdom........................  RAF Fairford..............  EDI: Construct DABS-FEV          $87,000,000
                                                                     Storage.................
                                        RAF Fairford..............  EDI: Munitions Holding           $19,000,000
                                                                     Area....................
----------------------------------------------------------------------------------------------------------------

     SEC. 2307. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL 
                   YEAR 2021 PROJECTS.

       (a) Air Force Construction and Land Acquisition Project.--
       (1) Extension.--Notwithstanding section 2002 of the 
     Military Construction Authorization Act for Fiscal Year 2021 
     (division B of Public Law 116-283; 134 Stat. 4294), the 
     authorization set forth in the table in paragraph (2), as 
     provided in section 2301 of that Act (134 Stat. 4299), shall 
     remain in effect until October 1, 2024, or the date of the 
     enactment of an Act authorizing funds for military 
     construction for fiscal year 2025, whichever is later.
       (2) Table.--The table referred to in paragraph (1) is as 
     follows:

                               Air Force: Extension of 2021 Project Authorization
----------------------------------------------------------------------------------------------------------------
                                                                                                    Original
                 State                   Installation or Location            Project               Authorized
                                                                                                     Amount
----------------------------------------------------------------------------------------------------------------
Virginia..............................  Joint Base Langley -        Access Control Point Main         $19,500,00
                                         Eustis...................   Gate with Lang Acq......
----------------------------------------------------------------------------------------------------------------

       (b) Overseas Contingency Operations.--
       (1) Extension.--Notwithstanding section 2002 of the 
     Military Construction Authorization Act for Fiscal Year 2021 
     (division B of Public Law 116-283; 134 Stat. 4294), the 
     authorizations set forth in the table in paragraph (2), as 
     provided in section 2902 of that Act (134 Stat. 4373), shall 
     remain in effect until October 1, 2024, or the date of the 
     enactment of an Act authorizing funds for military 
     construction for fiscal year 2025, whichever is later.
       (2) Table.--The table referred to in paragraph (1) is as 
     follows:

                               Air Force: Extension of 2021 Project Authorizations
----------------------------------------------------------------------------------------------------------------
                                                                                                    Original
                Country                  Installation or Location            Project               Authorized
                                                                                                     Amount
----------------------------------------------------------------------------------------------------------------
Germany...............................  Ramstein..................  EDI: Rapid Airfield              $36,345,000
                                                                     Damage Repair Storage...
                                        Spangdahlem Air Base......  EDI: Rapid Airfield              $25,824,000
                                                                     Damage Repair Storage...
----------------------------------------------------------------------------------------------------------------

           TITLE XXIV--DEFENSE AGENCIES MILITARY CONSTRUCTION

     SEC. 2401. AUTHORIZED DEFENSE AGENCIES CONSTRUCTION AND LAND 
                   ACQUISITION PROJECTS.

       (a) Inside the United States.--Using amounts appropriated 
     pursuant to the authorization of appropriations in section 
     2403(a) and available for military construction projects 
     inside the United States as specified in the funding table in 
     section 4601, the Secretary of Defense may acquire real 
     property and carry out military construction projects for the 
     installations or locations inside the United States, and in 
     the amounts, set forth in the following table:

                                   Defense Agencies: Inside the United States
----------------------------------------------------------------------------------------------------------------
                    State                                Installation or Location                   Amount
----------------------------------------------------------------------------------------------------------------
Alabama.....................................  Redstone Arsenal..............................        $147,975,000
California..................................  Marine Corps Air Station Miramar..............        $103,000,000
                                              Naval Base Coronado...........................         $51,000,000
                                              Naval Base San Diego..........................        $101,644,000
Delaware....................................  Dover Air Force Base..........................         $30,500,000
Maryland....................................  Fort Meade....................................        $885,000,000
                                              Joint Base Andrews............................         $38,300,000
Montana.....................................  Great Falls International Airport.............         $30,000,000
North Carolina..............................  Marine Corps Base Camp Lejeune................         $70,000,000
Utah........................................  Hill Air Force Base...........................         $14,200,000
Virginia....................................  Fort Belvoir..................................        $185,000,000
                                              Joint Expeditionary Base Little Creek - Fort           $61,000,000
                                               Story.
                                              Pentagon......................................         $30,600,000
Washington..................................  Joint Base Lewis - McChord....................         $62,000,000
                                              Manchester....................................         $71,000,000
                                              Naval Undersea Warfare Center Keyport.........         $37,000,000
----------------------------------------------------------------------------------------------------------------

       (b) Outside the United States.--Using amounts appropriated 
     pursuant to the authorization of appropriations in section 
     2403(a) and available for military construction projects 
     outside the United States as specified in the funding table 
     in section 4601, the Secretary of Defense may acquire real 
     property and carry out military construction projects for the 
     installations or locations outside the United States, and in 
     the amounts, set forth in the following table:

[[Page S3660]]



                                   Defense Agencies: Outside the United States
----------------------------------------------------------------------------------------------------------------
                   Country                                Installation or Location                   Amount
----------------------------------------------------------------------------------------------------------------
Cuba.........................................  Guantanamo Bay Naval Station..................       $257,000,000
Germany......................................  Baumholder....................................        $57,700,000
                                               Ramstein Air Base.............................       $181,764,000
Honduras.....................................  Soto Cano Air Base............................        $41,300,000
Japan........................................  Kadena Air Base...............................       $100,300,000
Spain........................................  Naval Station Rota............................        $80,000,000
----------------------------------------------------------------------------------------------------------------

     SEC. 2402. AUTHORIZED ENERGY RESILIENCE AND CONSERVATION 
                   INVESTMENT PROGRAM PROJECTS.

       (a) Inside the United States.--Using amounts appropriated 
     pursuant to the authorization of appropriations in section 
     2403(a) and available for energy conservation projects as 
     specified in the funding table in section 4601, the Secretary 
     of Defense may carry out energy conservation projects under 
     chapter 173 of title 10, United States Code, for the 
     installations or locations inside the United States, and in 
     the amounts, set forth in the following table:

                                    ERCIP Projects: Inside the United States
----------------------------------------------------------------------------------------------------------------
                    State                                Installation or Location                   Amount
----------------------------------------------------------------------------------------------------------------
California..................................  Marine Corps Air Station Miramar..............         $30,550,000
                                              Mountain View.................................         $15,500,000
                                              Naval Base San Diego..........................          $6,300,000
                                              Vandenberg Space Force Base...................         $57,000,000
Colorado....................................  Buckley Space Force Base......................         $14,700,000
Florida.....................................  Naval Air Station Whiting Field...............         $31,220,000
Georgia.....................................  Naval Submarine Base Kings Bay................         $49,500,000
Kansas......................................  Forbes Field..................................          $5,850,000
Missouri....................................  Lake City Army Ammunition Plant...............         $80,100,000
Nebraska....................................  Offutt Air Force Base.........................         $41,000,000
New Jersey..................................  Sea Girt......................................         $44,000,000
North Carolina..............................  Fort Liberty (Camp Mackall)...................         $10,500,000
Oklahoma....................................  Fort Sill.....................................         $76,650,000
Puerto Rico.................................  Fort Buchanan.................................         $56,000,000
Texas.......................................  Fort Cavazos..................................         $50,250,000
Utah........................................  Camp Williams.................................         $20,100,000
Virginia....................................  Pentagon......................................          $2,250,000
Washington..................................  Joint Base Lewis - McChord....................         $49,850,000
                                              Naval Base Kitsap.............................         $31,520,000
                                              Naval Magazine Indian Island..................         $37,770,000
Wyoming.....................................  F.E. Warren Air Force Base....................         $25,000,000
----------------------------------------------------------------------------------------------------------------

       (b) Outside the United States.--Using amounts appropriated 
     pursuant to the authorization of appropriations in section 
     2403(a) and available for energy conservation projects as 
     specified in the funding table in section 4601, the Secretary 
     of Defense may carry out energy conservation projects under 
     chapter 173 of title 10, United States Code, for the 
     installations or locations outside the United States, and in 
     the amounts, set forth in the following table:

                                    ERCIP Projects: Outside the United States
----------------------------------------------------------------------------------------------------------------
                   Country                                Installation or Location                   Amount
----------------------------------------------------------------------------------------------------------------
Diego Garcia.................................  Naval Support Facility Diego Garcia...........        $16,820,000
Korea........................................  K-16 Air Base.................................         $5,650,000
Kuwait.......................................  Camp Buehring.................................        $18,850,000
----------------------------------------------------------------------------------------------------------------

       (c) Improvement of Conveyed Utility Systems.--In the case 
     of a utility system that is conveyed under section 2688 of 
     title 10, United States Code, and that only provides utility 
     services to a military installation, notwithstanding 
     subchapters I and III of chapter 169 and chapters 221 and 223 
     of title 10, United States Code, the Secretary of Defense or 
     the Secretary of a military department may authorize a 
     contract with the conveyee of the utility system to carry out 
     the military construction projects set forth in the following 
     table:

                                     Improvement of Conveyed Utility Systems
----------------------------------------------------------------------------------------------------------------
                    State                                 Installation or Location                  Project
----------------------------------------------------------------------------------------------------------------
Nebraska.....................................  Offutt Air Force Base.........................      Microgrid and
                                                                                                    Backup Power
North Carolina...............................  Fort Liberty (Camp Mackall)...................      Microgrid and
                                                                                                    Backup Power
Texas........................................  Fort Cavazos..................................      Microgrid and
                                                                                                    Backup Power
Washington...................................  Joint Base Lewis - McChord....................   Power Generation
                                                                                                   and Microgrid
----------------------------------------------------------------------------------------------------------------


[[Page S3661]]

  


     SEC. 2403. AUTHORIZATION OF APPROPRIATIONS, DEFENSE AGENCIES.

       (a) Authorization of Appropriations.--Funds are hereby 
     authorized to be appropriated for fiscal years beginning 
     after September 30, 2023, for military construction, land 
     acquisition, and military family housing functions of the 
     Department of Defense (other than the military departments), 
     as specified in the funding table in section 4601.
       (b) Limitation on Total Cost of Construction Projects.--
     Notwithstanding the cost variations authorized by section 
     2853 of title 10, United States Code, and any other cost 
     variation authorized by law, the total cost of all projects 
     carried out under section 2401 of this Act may not exceed the 
     total amount authorized to be appropriated under subsection 
     (a), as specified in the funding table in section 4601.

     SEC. 2404. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL 
                   YEAR 2018 PROJECTS.

       (a) Extension.--Notwithstanding section 2002 of the 
     Military Construction Authorization Act for Fiscal Year 2018 
     (division B of Public Law 115-91; 131 Stat. 1817), the 
     authorizations set forth in the table in subsection (b), as 
     provided in section 2401(b) of that Act (131 Stat. 1829) and 
     extended by section 2404 of the Military Construction 
     Authorization Act for Fiscal Year 2023 (division B of Public 
     Law 117-263), shall remain in effect until October 1, 2024, 
     or the date of the enactment of an Act authorizing funds for 
     military construction for fiscal year 2025, whichever is 
     later.
       (b) Table.--The table referred to in subsection (a) is as 
     follows:

                           Defense Agencies: Extension of 2018 Project Authorizations
----------------------------------------------------------------------------------------------------------------
                                           Installation or                                 Original Authorized
               Country                         Location                 Project                   Amount
----------------------------------------------------------------------------------------------------------------
Japan................................  Iwakuni................  Construct Bulk Storage    $30,800,000
                                                                 Tanks PH 1............
Puerto Rico..........................  Punta Borinquen........  Ramey Unit School        $61,071,000
                                                                 Replacement...........
----------------------------------------------------------------------------------------------------------------

     SEC. 2405. EXTENSION AND MODIFICATION OF AUTHORITY TO CARRY 
                   OUT CERTAIN FISCAL YEAR 2019 PROJECTS.

       (a) Extension.--
       (1) In general.--Notwithstanding section 2002 of the 
     Military Construction Authorization Act for Fiscal Year 2019 
     (division B of Public Law 115-232; 132 Stat. 2240), the 
     authorizations set forth in the table in paragraph (2), as 
     provided in section 2401(b) of that Act (132 Stat. 2249), 
     shall remain in effect until October 1, 2024, or the date of 
     the enactment of an Act authorizing funds for military 
     construction for fiscal year 2025, whichever is later.
       (2) Table.--The table referred to in paragraph (1) is as 
     follows:

                           Defense Agencies: Extension of 2019 Project Authorizations
----------------------------------------------------------------------------------------------------------------
                                           Installation or                                 Original Authorized
               Country                         Location                 Project                   Amount
----------------------------------------------------------------------------------------------------------------
Germany..............................  Baumholder.............  SOF Joint Parachute       $11,504,000
                                                                 Rigging Facility......
Japan................................  Camp McTureous.........  Betchel Elementary       $94,851,000
                                                                 School................
                                       Iwakuni................   Fuel Pier.............  $33,200,000
----------------------------------------------------------------------------------------------------------------

       (b) Modification of Authority to Carry Out Fiscal Year 2019 
     Project in Baumholder, Germany.--
       (1) Modification of project authority.--In the case of the 
     authorization contained in the table in section 2401(b) of 
     the Military Construction Authorization Act for Fiscal Year 
     2019 (division B of Public Law 115-232; 132 Stat. 2249) for 
     Baumholder, Germany, for construction of a SOF Joint 
     Parachute Rigging Facility, the Secretary of Defense may 
     construct a 3,200 square meter facility.
       (2) Modification of project amounts.--
       (A) Division b table.--The authorization table in section 
     2401(b) of the Military Construction Defense Authorization 
     Act for Fiscal Year 2019 (division B of Public Law 115-232; 
     132 Stat. 2249), as extended pursuant to subsection (a), is 
     amended in the item relating to Baumholder, Germany, by 
     striking ``$11,504,000'' and inserting ``$23,000,000'' to 
     reflect the project modification made by paragraph (1).
       (B) Division d table.--The funding table in section 4601 of 
     the John S. McCain National Defense Authorization Act for 
     Fiscal Year 2019 (Public Law 115-232; 132 Stat. 2406) is 
     amended in the item relating to Defense-wide, Baumholder, 
     Germany, SOF Joint Parachute Rigging Facility, by striking 
     ``$11,504'' in the Conference Authorized column and inserting 
     ``$23,000'' to reflect the project modification made by 
     paragraph (1).

     SEC. 2406. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL 
                   YEAR 2021 PROJECTS.

       (a) Defense Agencies Construction and Land Acquisition 
     Project.--
       (1) Extension.--Notwithstanding section 2002 of the 
     Military Construction Authorization Act for Fiscal Year 2021 
     (division B of Public Law 116-283; 134 Stat. 4294), the 
     authorization set forth in the table in paragraph (2), as 
     provided in section 2401(b) of that Act (134 Stat. 4305), 
     shall remain in effect until October 1, 2024, or the date of 
     the enactment of an Act authorizing funds for military 
     construction for fiscal year 2025, whichever is later.
       (2) Table.--The table referred to in paragraph (1) is as 
     follows:

                            Defense Agencies: Extension of 2021 Project Authorization
----------------------------------------------------------------------------------------------------------------
                                           Installation or                                 Original Authorized
               Country                         Location                 Project                   Amount
----------------------------------------------------------------------------------------------------------------
Japan................................  Def Fuel Support Point   Fuel Wharf.............   $49,500,000
                                        Tsurumi...............
----------------------------------------------------------------------------------------------------------------

       (b) Energy Resilience and Conservation Investment Program 
     Projects.--
       (1) Extension.--Notwithstanding section 2002 of the 
     Military Construction Authorization Act for Fiscal Year 2021 
     (division B of Public Law 116-283; 134 Stat. 4294), the 
     authorizations set forth in the table in paragraph (2), as 
     provided in section 2402 of that Act (134 Stat. 4306), shall 
     remain in effect until October 1, 2024, or the date of the 
     enactment of an Act authorizing funds for military 
     construction for fiscal year 2025, whichever is later.
       (2) Table.--The table referred to in subsection (a) is as 
     follows:

                            ERCIP Projects: Extension of 2021 Project Authorizations
----------------------------------------------------------------------------------------------------------------
                                           Installation or                                 Original Authorized
            State/Country                      Location                 Project                   Amount
----------------------------------------------------------------------------------------------------------------
Arkansas.............................  Ebbing Air National      PV Arrays and Battery     $2,600,000
                                        Guard Base............   Storage...............
California...........................  Marine Corps Air Ground  Install 10 Mw Battery    $11,646,000
                                        Combat Center            Energy Storage for
                                        Twentynine Palms......   Various Buildings.....

[[Page S3662]]

 
                                       Military Ocean Terminal  Military Ocean Terminal  $29,000,000
                                        Concord...............   Concord Microgrid.....
                                       Naval Support Activity   Cogeneration Plant at    $10,540,000
                                        Monterey..............   B236..................
Italy................................  Naval Support Activity   Smart Grid.............  $3,490,000
                                        Naples................
Nevada...............................  Creech Air Force Base..  Central Standby          $32,000,000
                                                                 Generators............
Virginia.............................  Naval Medical Center     Retro Air Handling       $611,000
                                        Portsmouth............   Units From Constant
                                                                 Volume; Reheat to
                                                                 Variable Air Volume...
----------------------------------------------------------------------------------------------------------------

     SEC. 2407. ADDITIONAL AUTHORITY TO CARRY OUT CERTAIN FISCAL 
                   YEAR 2022 PROJECTS.

       In the case of a utility system that is conveyed under 
     section 2688 of title 10, United States Code, and that only 
     provides utility services to a military installation, 
     notwithstanding subchapters I and III of chapter 169 and 
     chapters 221 and 223 of title 10, United States Code, the 
     Secretary of Defense or the Secretary of a military 
     department may authorize a contract with the conveyee of the 
     utility system to carry out the military construction 
     projects set forth in the following table:

                                     Improvement of Conveyed Utility Systems
----------------------------------------------------------------------------------------------------------------
                    State                                 Installation or Location                  Project
----------------------------------------------------------------------------------------------------------------
Alabama......................................  Fort Novosel..................................  Construct a 10 MW
                                                                                                  RICE Generator
                                                                                                Plant and Micro-
                                                                                                   Grid Controls
Georgia......................................  Fort Moore....................................    Construct 4.8MW
                                                                                                  Generation and
                                                                                                       Microgrid
                                                Fort Stewart.................................  Construct a 10 MW
                                                                                               Generation Plant,
                                                                                                  with Microgrid
                                                                                                        Controls
New York.....................................  Fort Drum.....................................         Well Field
                                                                                               Expansion Project
North Carolina...............................  Fort Liberty..................................    Construct 10 MW
                                                                                                       Microgrid
                                                                                                       Utilizing
                                                                                                Existing and New
                                                                                                      Generators
                                               Fort Liberty..................................       Fort Liberty
                                                                                                 Emergency Water
                                                                                                          System
----------------------------------------------------------------------------------------------------------------

     SEC. 2408. ADDITIONAL AUTHORITY TO CARRY OUT CERTAIN FISCAL 
                   YEAR 2023 PROJECTS.

       In the case of a utility system that is conveyed under 
     section 2688 of title 10, United States Code, and that only 
     provides utility services to a military installation, 
     notwithstanding subchapters I and III of chapter 169 and 
     chapters 221 and 223 of title 10, United States Code, the 
     Secretary of Defense or the Secretary of a military 
     department may authorize a contract with the conveyee of the 
     utility system to carry out the military construction 
     projects set forth in the following table:

                                     Improvement of Conveyed Utility Systems
----------------------------------------------------------------------------------------------------------------
                    State                                 Installation or Location                  Project
----------------------------------------------------------------------------------------------------------------
Georgia......................................  Fort Stewart - Hunter Army Airfield...........   Power Generation
                                                                                                   and Microgrid
Kansas.......................................  Fort Riley....................................   Power Generation
                                                                                                   and Microgrid
Texas........................................  Fort Cavazos..................................   Power Generation
                                                                                                   and Microgrid
----------------------------------------------------------------------------------------------------------------

            TITLE XXVI--GUARD AND RESERVE FORCES FACILITIES

     SEC. 2601. AUTHORIZED ARMY NATIONAL GUARD CONSTRUCTION AND 
                   LAND ACQUISITION PROJECTS.

       Using amounts appropriated pursuant to the authorization of 
     appropriations in section 2606 and available for the National 
     Guard and Reserve as specified in the funding table in 
     section 4601, the Secretary of the Army may acquire real 
     property and carry out military construction projects for the 
     Army National Guard locations inside the United States, and 
     in the amounts, set forth in the following table:

[[Page S3663]]



                                               Army National Guard
----------------------------------------------------------------------------------------------------------------
                    State                                          Location                           Amount
----------------------------------------------------------------------------------------------------------------
Arizona.....................................  Surprise Readiness Center........................      $15,000,000
Florida.....................................  Camp Blanding....................................      $11,000,000
Idaho.......................................  Jerome County Regional Site......................      $17,000,000
Illinois....................................  North Riverside Armory...........................      $24,000,000
Kentucky                                      Burlington.......................................      $16,400,000
Mississippi                                   Southaven........................................      $22,000,000
Missouri....................................  Belle Fontaine...................................      $28,000,000
New Hampshire...............................  Littleton........................................      $23,000,000
New Mexico..................................  Rio Rancho Training Site.........................      $11,000,000
New York....................................  Lexington Avenue Armory..........................      $90,000,000
Ohio........................................  Camp Perry Joint Training Center.................      $19,200,000
Oregon                                        Washington County Readiness Center...............      $26,000,000
Pennsylvania................................  Hermitage Readiness Center.......................      $13,600,000
Rhode Island................................  North Kingstown..................................      $30,000,000
South Carolina..............................  Aiken County Readiness Center....................      $20,000,000
                                              McCrady Training Center..........................       $7,900,000
Virginia....................................  Sandston RC & FMS 1..............................      $20,000,000
Wisconsin...................................  Viroqua..........................................      $18,200,000
----------------------------------------------------------------------------------------------------------------

     SEC. 2602. AUTHORIZED ARMY RESERVE CONSTRUCTION AND LAND 
                   ACQUISITION PROJECTS.

       Using amounts appropriated pursuant to the authorization of 
     appropriations in section 2606 and available for the National 
     Guard and Reserve as specified in the funding table in 
     section 4601, the Secretary of the Army may acquire real 
     property and carry out military construction projects for the 
     Army Reserve locations inside the United States, and in the 
     amounts, set forth in the following table:

                                                  Army Reserve
----------------------------------------------------------------------------------------------------------------
                    State                                          Location                           Amount
----------------------------------------------------------------------------------------------------------------
Alabama.....................................  Birmingham.......................................      $57,000,000
Arizona.....................................  San Tan Valley...................................      $12,000,000
California..................................  Fort Hunter Liggett..............................      $40,000,000
                                              Parks Reserve Forces Training Area...............      $35,000,000
Georgia.....................................   Marine Corps Logistics Base Albany..............      $40,000,000
Massachusetts...............................   Devens Reserve Forces Training Area.............      $39,000,000
Puerto Rico.................................  Fort Buchanan....................................      $39,000,000
----------------------------------------------------------------------------------------------------------------

     SEC. 2603. AUTHORIZED NAVY RESERVE AND MARINE CORPS RESERVE 
                   CONSTRUCTION AND LAND ACQUISITION PROJECTS.

       Using amounts appropriated pursuant to the authorization of 
     appropriations in section 2606 and available for the National 
     Guard and Reserve as specified in the funding table in 
     section 4601, the Secretary of the Navy may acquire real 
     property and carry out military construction projects for the 
     Navy Reserve and Marine Corps Reserve locations inside the 
     United States, and in the amounts, set forth in the following 
     table:

                                      Navy Reserve and Marine Corps Reserve
----------------------------------------------------------------------------------------------------------------
                    State                                          Location                           Amount
----------------------------------------------------------------------------------------------------------------
Michigan....................................  Battle Creek.....................................      $24,549,000
Virginia....................................  Marine Forces Reserve Dam Neck Virginia Beach....      $12,400,000
----------------------------------------------------------------------------------------------------------------

     SEC. 2604. AUTHORIZED AIR NATIONAL GUARD CONSTRUCTION AND 
                   LAND ACQUISITION PROJECTS.

       Using amounts appropriated pursuant to the authorization of 
     appropriations in section 2606 and available for the National 
     Guard and Reserve as specified in the funding table in 
     section 4601, the Secretary of the Air Force may acquire real 
     property and carry out military construction projects for the 
     Air National Guard locations inside the United States, and in 
     the amounts, set forth in the following table:

                                               Air National Guard
----------------------------------------------------------------------------------------------------------------
                    State                                          Location                           Amount
----------------------------------------------------------------------------------------------------------------
Alabama.....................................  Montgomery Regional Airport......................       $7,000,000
Alaska......................................  Joint Base Elmendorf - Richardson................       $7,000,000
Arizona.....................................  Tucson International Airport.....................      $11,600,000
Arkansas....................................  Ebbing Air National Guard Base...................      $76,000,000
Colorado....................................  Buckley Space Force Base.........................      $12,000,000
Georgia.....................................  Savannah/Hilton Head International Airport.......      $27,000,000
Indiana.....................................  Fort Wayne International Airport.................       $8,900,000
Oregon......................................  Portland International Airport...................      $71,500,000
Pennsylvania................................  Harrisburg International Airport.................       $8,000,000
Wisconsin...................................  Truax Field......................................       $5,200,000
----------------------------------------------------------------------------------------------------------------

     SEC. 2605. AUTHORIZED AIR FORCE RESERVE CONSTRUCTION AND LAND 
                   ACQUISITION PROJECTS.

       Using amounts appropriated pursuant to the authorization of 
     appropriations in section 2606 and available for the National 
     Guard and Reserve as specified in the funding table in 
     section 4601, the Secretary of the Air Force may acquire real 
     property and carry out military construction projects for the 
     Air Force Reserve locations inside the United States, and in 
     the amounts, set forth in the following table:

[[Page S3664]]



                                                Air Force Reserve
----------------------------------------------------------------------------------------------------------------
                    State                                          Location                           Amount
----------------------------------------------------------------------------------------------------------------
Arizona.....................................  Davis - Monthan Air Force Base...................       $8,500,000
California..................................  March Air Reserve Base...........................     $226,500,000
Guam........................................  Joint Region Marianas............................      $27,000,000
Louisiana...................................  Barksdale Air Force Base.........................       $7,000,000
Texas.......................................  Naval Air Station Joint Reserve Base Fort Worth..      $16,000,000
----------------------------------------------------------------------------------------------------------------

     SEC. 2606. AUTHORIZATION OF APPROPRIATIONS, NATIONAL GUARD 
                   AND RESERVE.

       Funds are hereby authorized to be appropriated for fiscal 
     years beginning after September 30, 2023, for the costs of 
     acquisition, architectural and engineering services, and 
     construction of facilities for the Guard and Reserve Forces, 
     and for contributions therefor, under chapter 1803 of title 
     10, United States Code (including the cost of acquisition of 
     land for those facilities), as specified in the funding table 
     in section 4601.

     SEC. 2607. EXTENSION OF AUTHORITY TO CARRY OUT FISCAL YEAR 
                   2018 PROJECT AT HULMAN REGIONAL AIRPORT, 
                   INDIANA.

       (a) Extension.--Notwithstanding section 2002 of the 
     Military Construction Authorization Act for Fiscal Year 2018 
     (division B of Public Law 115-91; 131 Stat. 1817), the 
     authorization set forth in the table in subsection (b), as 
     provided in section 2604 of that Act (131 Stat. 1836) and 
     extended by section 2608 of the Military Construction 
     Authorization Act for Fiscal Year 2023 (division B of Public 
     Law 117-263), shall remain in effect until October 1, 2024, 
     or the date of the enactment of an Act authorizing funds for 
     military construction for fiscal year 2025, whichever is 
     later.
       (b) Table.--The table referred to in subsection (a) is as 
     follows:

                       National Guard and Reserve: Extension of 2018 Project Authorization
----------------------------------------------------------------------------------------------------------------
                                           Installation or                                 Original Authorized
                State                          Location                 Project                   Amount
----------------------------------------------------------------------------------------------------------------
Indiana..............................  Hulman Regional Airport  Construct Small Arms     $8,000,000
                                                                 Range.................
----------------------------------------------------------------------------------------------------------------

     SEC. 2608. EXTENSION OF AUTHORITY TO CARRY OUT FISCAL YEAR 
                   2019 PROJECT AT FRANCIS S. GABRESKI AIRPORT, 
                   NEW YORK.

       (a) Extension.--Notwithstanding section 2002 of the 
     Military Construction Authorization Act for Fiscal Year 2019 
     (division B of Public Law 115-232; 132 Stat. 2240), the 
     authorization set forth in the table in subsection (b), as 
     provided in section 2604 of that Act (132 Stat. 2255), shall 
     remain in effect until October 1, 2024, or the date of the 
     enactment of an Act authorizing funds for military 
     construction for fiscal year 2025, whichever is later.
       (b) Table.--The table referred to in subsection (a) is as 
     follows:

                       National Guard and Reserve: Extension of 2019 Project Authorization
----------------------------------------------------------------------------------------------------------------
                                           Installation or                                 Original Authorized
                State                          Location                 Project                   Amount
----------------------------------------------------------------------------------------------------------------
New York.............................  Francis S. Gabreski      Security Forces/Comm.    $20,000,000
                                        Airport...............   Training Facility.....
----------------------------------------------------------------------------------------------------------------

     SEC. 2609. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL 
                   YEAR 2021 PROJECTS.

       (a) Extension.--Notwithstanding section 2002 of the 
     Military Construction Authorization Act for Fiscal Year 2021 
     (division B of Public Law 116-283; 134 Stat. 4294), the 
     authorizations set forth in the table in subsection (b), as 
     provided in sections 2601, 2602, and 2604 of that Act (134 
     Stat. 4312, 4313, 4314), shall remain in effect until October 
     1, 2024, or the date of the enactment of an Act authorizing 
     funds for military construction for fiscal year 2025, 
     whichever is later.
       (b) Table.--The table referred to in subsection (a) is as 
     follows:

                      National Guard and Reserve: Extension of 2021 Project Authorizations
----------------------------------------------------------------------------------------------------------------
                                           Installation or                                 Original Authorized
            State/Country                      Location                 Project                   Amount
----------------------------------------------------------------------------------------------------------------
Arkansas.............................  Fort Chaffee...........  National Guard           $15,000,000
                                                                 Readiness Center......
California...........................  Bakersfield............  National Guard Vehicle   $9,300,000
                                                                 Maintenance Shop......
Colorado.............................  Peterson Space Force     National Guard           $15,000,000
                                        Base..................   Readiness Center......
Guam.................................  Joint Region Marianas..   Space Control Facility  $20,000,000
                                                                 #5....................
Ohio.................................  Columbus...............  National Guard           $15,000,000
                                                                 Readiness Center......
Massachusetts........................  Devens Reserve Forces    Automated Multipurpose   $8,700,000
                                        Training Area.........   Machine Gun Range.....
North Carolina.......................  Asheville..............  Army Reserve Center/     $24,000,000
                                                                 Land..................
Puerto Rico..........................  Fort Allen.............  National Guard           $37,000,000
                                                                 Readiness Center......
South Carolina.......................   Joint Base Charleston.  National Guard           $15,000,000
                                                                 Readiness Center......
Texas................................  Fort Worth.............  Aircraft Maintenance      $6,000,000
                                                                 Hangar Addition/Alt...
                                       Joint Base San Antonio.  F-16 Mission Training    $10,800,000
                                                                 Center................
Virgin Islands.......................  St. Croix..............  Army Aviation Support     $28,000,000
                                                                 Facility (AASF).......
                                       .......................  CST Ready Building.....  $11,400,000
----------------------------------------------------------------------------------------------------------------

     SEC. 2610. MODIFICATION OF AUTHORITY TO CARRY OUT FISCAL YEAR 
                   2022 PROJECT AT NICKELL MEMORIAL ARMORY, 
                   KANSAS.

       (a) Transfer Authority.--From amounts appropriated for 
     ``Military Construction, Army National Guard'' pursuant to 
     the authorization of appropriations in section 2606 and 
     available as specified in the funding table in section 4601 
     of the National Defense Authorization Act for Fiscal Year 
     2022 (Public Law 117-81, 135 Stat. 2315), the Secretary of 
     Defense may transfer not more than $420,000 to an 
     appropriation for ``Military Construction, Air National 
     Guard'' for use for studying, planning, designing, and 
     architect and engineer services for a sensitive compartmented 
     information facility project at Nickell Memorial Armory, 
     Kansas.
       (b) Merger of Amounts Transferred.--Any amount transferred 
     under subsection (a) shall be merged with and available for 
     the same purposes, and for the same time period, as the 
     ``Military Construction, Air National Guard'' appropriation 
     to which transferred.
       (c) Authority.--Using amounts transferred pursuant to 
     subsection (a), the Secretary of the Air Force may carry out 
     study, planning, design, and architect and engineer services 
     activities for a sensitive compartmented information facility 
     project at Nickell Memorial Armory, Kansas.

     SEC. 2611. MODIFICATION OF AUTHORITY TO CARRY OUT FISCAL YEAR 
                   2023 PROJECT AT CAMP PENDLETON, CALIFORNIA.

       In the case of the authorization contained in the table in 
     section 2602 of the Military

[[Page S3665]]

     Construction Authorization Act for Fiscal Year 2023 (division 
     B of Public Law 117-263) and specified in the funding table 
     in section 4601 of the James M. Inhofe National Defense 
     Authorization Act for Fiscal Year 2023 (Public Law 117-263) 
     for Camp Pendleton, California, for construction of an Area 
     Maintenance Support Activity, the Secretary of the Army may 
     construct a 15,000 square foot facility.
                                 ______